49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
DOT National Transportation Integrated Search
1996-08-01
This Program Plan for the Advanced Rural Transportation Systems (ARTS) implements the goals and objectives established in the U.S. Department of Transportations (USDOTs) Strategic Plan for the ARTS. This Program Plan proposes five years (FY 97...
49 CFR 659.25 - Annual review of system safety program plan and system security plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...
Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan
NASA Technical Reports Server (NTRS)
1973-01-01
The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.
Program Planning in Health Professions Education
ERIC Educational Resources Information Center
Schmidt, Steven W.; Lawson, Luan
2018-01-01
In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.
SDDOT transportation systems management & operations program plan.
DOT National Transportation Integrated Search
2016-06-01
The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...
National ITS Program Plan Intelligent Transportation Systems Volume I
DOT National Transportation Integrated Search
1995-03-01
ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS : THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT ...
NASA Technical Reports Server (NTRS)
Dunbar, J. C.
1972-01-01
The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.
Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan
NASA Technical Reports Server (NTRS)
1972-01-01
A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... Promulgation of Air Quality Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental..., 2001, and August 16, 2007, that create and amend the System Cap Trading (SCT) Program at Title 30 of.... What action is EPA proposing? II. What did Texas submit? III. What is the System Cap Trading Program...
Integrated flexible manufacturing program for manufacturing automation and rapid prototyping
NASA Technical Reports Server (NTRS)
Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.
1993-01-01
The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
ERIC Educational Resources Information Center
Bhola, H. S.
Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
NASA Technical Reports Server (NTRS)
1980-01-01
A brief description of the Global Weather Experiment is presented. The world weather watch program plan is described and includes a global observing system, a global data processing system, a global telecommunication system, and a voluntary cooperation program. A summary of Federal Agency plans and programs to meet the challenges of international meteorology for the two year period, FY 1980-1981, is presented.
Louisiana Airport System Plan Five-Year Capital Improvement Program.
DOT National Transportation Integrated Search
1992-07-01
The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...
Project Planning and Reporting
NASA Technical Reports Server (NTRS)
1982-01-01
Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the Federal civil service system and a description of recruitment programs developed to increase... program plans and should be developed with full consideration of the agency's overall recruiting and...) AFFIRMATIVE EMPLOYMENT PROGRAMS Federal Equal Opportunity Recruitment Program § 720.205 Agency plans. (a) Each...
Wind Shear radar program future plans
NASA Technical Reports Server (NTRS)
Robertson, Roy E.
1991-01-01
The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.
National ITS Program Plan, Intelligent Transportation Systems, Synopsis
DOT National Transportation Integrated Search
THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...
Program planning for the community teaching hospital medical library.
McCorkel, J; Cook, V
1985-01-01
To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443
National ITS Program Plan, Intelligent Transportation Systems Volume II
DOT National Transportation Integrated Search
1995-03-01
THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...
Underground storage tank management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-09-01
The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less
76 FR 19739 - Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0013; FRL-9290-1] Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental Protection Agency... the System Cap Trading (SCT) Program at Title 30 Texas Administrative Code, Chapter 101--General Air...
DOT National Transportation Integrated Search
1997-07-01
This report describes the work of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study is to define the market, organization, and resource requirements for a national program...
ERIC Educational Resources Information Center
Nagle, John M.; Walker, Harold E.
The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. This…
Future Orbital Power Systems Technology Requirements
NASA Technical Reports Server (NTRS)
1978-01-01
NASA is actively involved in program planning for missions requiring several orders of magnitude, more energy than in the past. Therefore, a two-day symposium was held to review the technology requirements for future orbital power systems. The purpose of the meeting was to give leaders from government and industry a broad view of current government supported technology efforts and future program plans in space power. It provided a forum for discussion, through workshops, to comment on current and planned programs and to identify opportunities for technology investment. Several papers are presented to review the technology status and the planned programs.
Career Planning Support System Program (CPSS). Final Report.
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. National Center for Research in Vocational Education.
Intended for the developmental practitioner, this report examines literature produced by the Career Planning Support System dealing with career guidance in four major areas: minority youth; women; transition from school to work; and program planning and evaluation. The area of minority youth includes a review of literature on: educational and…
Integrating Computer-Based Career Development into Your Career Planning Program.
ERIC Educational Resources Information Center
Campbell, Robert B.; Mack, Sharon E.
This paper focuses on the real and theoretical usefulness of a computer-based career development system in a career planning program, based on a 2-year pilot program evaluating the DISCOVER system. The system overview discusses components and contents of DISCOVER, and describes the 11 modules which assist users in learning about their values,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
Multi-community command and control systems in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.
1976-01-01
A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.
Space Station Mission Planning System (MPS) development study. Volume 2
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The process and existing software used for Spacelab payload mission planning were studied. A complete baseline definition of the Spacelab payload mission planning process was established, along with a definition of existing software capabilities for potential extrapolation to the Space Station. This information was used as a basis for defining system requirements to support Space Station mission planning. The Space Station mission planning concept was reviewed for the purpose of identifying areas where artificial intelligence concepts might offer substantially improved capability. Three specific artificial intelligence concepts were to be investigated for applicability: natural language interfaces; expert systems; and automatic programming. The advantages and disadvantages of interfacing an artificial intelligence language with existing FORTRAN programs or of converting totally to a new programming language were identified.
Navstar Global Positioning System (GPS) clock program: Present and future
NASA Technical Reports Server (NTRS)
Tennant, D. M.
1981-01-01
Global Positioning System (GPS) program status are discussed and plans for ensuring the long term continuation of the program are presented. Performance of GPS clocks is presented in terms of on orbit data as portrayed by GPS master control station kalman filter processing. The GPS Clock reliability program is reviewed in depth and future plans fo the overall clock program are published.
A Technology Plan for Enabling Commercial Space Business
NASA Technical Reports Server (NTRS)
Lyles, Garry M.
1997-01-01
The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.
Making Decisions in a Time of Fiscal Stringency: The Longer-Term Implications.
ERIC Educational Resources Information Center
Bowen, Frank M.
The concept of traditional planning, programming, and budgeting systems (PPBS) is defined and compared with imperative planning, a term used to refer to whatever procedures higher education officials use to integrate program planning and budgeting. The University of Wisconsin system is described as an example of emerging budgetary practice in…
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
Preliminary logging analysis system (PLANS): overview.
R.H. Twito; S.E. Reutebuch; R.J. McGaughey; C.N. Mann
1987-01-01
The paper previews a computer-aided design system, PLANS, that is useful for developing timber harvest and road network plans on large-scale topographic maps. Earlier planning techniques are reviewed, and the advantages are explained of using advanced planning systems like PLANS. There is a brief summary of the input, output, and function of each program in the PLANS...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, S; Guerrero, M; Zhang, B
Purpose: To implement a comprehensive non-measurement-based verification program for patient-specific IMRT QA Methods: Based on published guidelines, a robust IMRT QA program should assess the following components: 1) accuracy of dose calculation, 2) accuracy of data transfer from the treatment planning system (TPS) to the record-and-verify (RV) system, 3) treatment plan deliverability, and 4) accuracy of plan delivery. Results: We have implemented an IMRT QA program that consist of four components: 1) an independent re-calculation of the dose distribution in the patient anatomy with a commercial secondary dose calculation program: Mobius3D (Mobius Medical Systems, Houston, TX), with dose accuracy evaluationmore » using gamma analysis, PTV mean dose, PTV coverage to 95%, and organ-at-risk mean dose; 2) an automated in-house-developed plan comparison system that compares all relevant plan parameters such as MU, MLC position, beam iso-center position, collimator, gantry, couch, field size settings, and bolus placement, etc. between the plan and the RV system; 3) use of the RV system to check the plan deliverability and further confirm using “mode-up” function on treatment console for plans receiving warning; and 4) implementation of a comprehensive weekly MLC QA, in addition to routine accelerator monthly and daily QA. Among 1200 verifications, there were 9 cases of suspicious calculations, 5 cases of delivery failure, no data transfer errors, and no failure of weekly MLC QA. These 9 suspicious cases were due to the PTV extending to the skin or to heterogeneity correction effects, which would not have been caught using phantom measurement-based QA. The delivery failure was due to the rounding variation of MLC position between the planning system and RV system. Conclusion: A very efficient, yet comprehensive, non-measurement-based patient-specific QA program has been implemented and used clinically for about 18 months with excellent results.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
78 FR 25760 - Proposed Information Collection; Urban Park and Recreation Recovery Program Grants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-02
...--renovate or redesign existing close-to- home recreation facilities. Innovation--specific activities that... existing programs. Planning--development of a Recovery Action Program plan. The information collection... recreation system goals. Citizen involvement in the development of the Action Plan is required and may...
A Capital Assets Preservation Program.
ERIC Educational Resources Information Center
Heiman, Ralph
1989-01-01
New York State officials have created an efficient capital planning system that is a prescribed set of procedures and actions within a program planning manual and two software modules. The program is a series of logical steps that school districts must take to successfully implement their preservation plans. (MLF)
NASA Technical Reports Server (NTRS)
Schulze, Norman; Cimolino, Marc; Guenther, Arthur; Mcminn, Ted; Rainer, Frank; Schmid, Ansgar; Seitel, Steven C.; Soileau, M. J.; Theon, John S.; Walz, William
1991-01-01
NASA has defined a program to address critical laser-induced damage issues peculiar to its remote sensing systems. The Langley Research Center (LaRC), with input from the Goddard Space Flight Center (GSFC), has developed a program plan focusing on the certification of optical materials for spaceflight applications and the development of techniques to determine the reliability of such materials under extended laser exposures. This plan involves cooperative efforts between NASA and optics manufacturers to quantify the performance of optical materials for NASA systems and to ensure NASA's continued application of the highest quality optics possible for enhanced system reliability. A review panel was organized to assess NASA's optical damage concerns and to evaluate the effectiveness of the LaRC proposed program plan. This panel consisted of experts in the areas of laser-induced damage, optical coating manufacture, and the design and development of laser systems for space. The panel was presented information on NASA's current and planned laser remote sensing programs, laser-induced damage problems already encountered in NASA systems, and the proposed program plan to address these issues. Additionally, technical presentations were made on the state of the art in damage mechanisms, optical materials testing, and issues of coating manufacture germane to laser damage.
DOT National Transportation Integrated Search
1997-02-01
This report was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national program to apply In...
Peer Review Of The National Highway Traffic Safety Administration Program, Workshop Proceedings
DOT National Transportation Integrated Search
1995-12-11
THE NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION PREPARED AN INTELLIGENT TRANSPORTATION SYSTEMS PROGRAM PLAN AS PART OF THE EARLY PLANNING FOR THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) WORK WITHIN THE DEPARTMENT OF TRANSPORTATION. COMMERCIALIZATI...
Inventorying national forest resources...for planning-programing-budgeting system
Miles R. Hill; Elliot L. Amidon
1968-01-01
New systems for analyzing resource management problems, such as Planning-Programing-Budgeting, will require automated procedures to collect and assemble resource inventory data. A computer - oriented system called Map Information Assembly and Display System developed for this purpose was tested on a National Forest in California. It provided information on eight forest...
Farmers and Bankers Are Interested in F.B.P.A. (Farm Business Planning and Analysis)
ERIC Educational Resources Information Center
Borton, John L.
1974-01-01
A successful Farm Business Planning and Analysis program is being taught by the Upper Sandusky, Ohio, Vocational Agriculture Department fo farm operators, farm couples, bankers, and vocational agriculture teachers and students. The F.B.P.A. program consists of developing a record system, summarizing and analyzing the system, and planning future…
The Development of a Planning, Programming and Budgeting System. Technical Report.
ERIC Educational Resources Information Center
Appelquist, Claes-Goran; Zandren, S.
In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
Eleventh Annual Report of Accomplishments Under the Airport Improvement Program
1992-01-01
552,860 INSTALL SECURITY SYSTEM PORTLAND INTERNATIONAL JETPORT (PRIMARY) 25 $255, 195 CONSTRUCT ACCESS ROAD PRESQUE ISLE 09 $988,548 CONSTRUCT AIRCRAFT...TAXIWAYS; INSTALL VISUAL APPROACH AIDS PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA S7 $89,050 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) DELAWARE...VALLEY REGION RA $195,030 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) SOUTHWESTERN PENNSYLVANIA REGION RA $310,950 CONDUCT REGIONAL SYSTEM PLAN
Rhode Island congestion management plan : executive summary
DOT National Transportation Integrated Search
1997-09-01
This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...
Quality program plan for the Ultraviolet Spectrometer Experiment S169, Revision C
NASA Technical Reports Server (NTRS)
Vinson, W. W.
1971-01-01
The quality progress plan establishes the requirements for a system of controls to assure compliance with the quality assurance requirements as set forth in NASA quality program provisions for aeronautical and space system contractors.
Autonomous Vehicle Mission Planning Using AI (Artificial Intelligence) Techniques.
1985-12-01
it uses are declarative patterns that encode facts about how goals may give rise to - . plans. The program processes a story a sentence at a time...the planning process. By separating the knowledge about how to plan from the specific domain knowledge, an understander can use this knowledge about how ...path planning program developed in a previous thesis effort will be incorporated into the overall program in order to demonstrate the operating system
Advanced On-the-Job Training System: Master Test Plan
1990-05-01
synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four crit’cal issues of system compliance...acceptance, performance and suitability. Within the MTP, these critical issues are assessed at subcomponent, component, and subsystem levels. 14. SUBJECT...Master Test Plan is synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four critical issues
DOT National Transportation Integrated Search
2000-01-01
The purpose of the Florida Rail System Plan is two-fold. First, it represents the rail : component of the Florida Transportation Plan (Agency Functional Plan) which, through an : annual series of policies, programs and projects, implements the Transp...
OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA earth science and applications division: The program and plans for FY 1988-1989-1990
NASA Technical Reports Server (NTRS)
1988-01-01
Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.
NASA Technical Reports Server (NTRS)
Campbell, B. H.
1974-01-01
A study is described which was initiated to identify and quantify the interrelationships between and within the performance, safety, cost, and schedule parameters for unmanned, automated payload programs. The result of the investigation was a systems cost/performance model which was implemented as a digital computer program and could be used to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses for mission model and advanced payload studies. Program objectives and results are described briefly.
Stirman, Shannon Wiltsey; Matza, Alexis; Gamarra, Jennifer; Toder, Katherine; Xhezo, Regina; Evans, Arthur C; Hurford, Matthew; Beck, Aaron T; Crits-Christoph, Paul; Creed, Torrey
2015-07-01
The purpose of this study was to examine influences on the sustainability of a program to implement an evidence-based psychotherapy in a mental health system. Interviews with program administrators, training consultants, agency administrators, and supervisors (N=24), along with summaries of program evaluation data and program documentation, were analyzed with a directed content-analytic approach. Findings suggested a number of interconnected and interacting influences on sustainability, including alignment with emerging sociopolitical influences and system and organizational priorities; program-level adaptation and evolution; intervention flexibility; strong communication, collaboration, planning, and support; and perceived benefit. These individual factors appeared to mutually influence one another and contribute to the degree of program sustainability achieved at the system level. Although most influences were positive, financial planning and support emerged as potentially both facilitator and barrier, and evaluation of benefits at the patient level remained a challenge. Several factors appeared to contribute to the sustainability of a psychosocial intervention in a large urban mental health system and warrant further investigation. Understanding interconnections between multiple individual facilitators and barriers appears critical to advancing understanding of sustainability in dynamic systems and adds to emerging recommendations for other implementation efforts. In particular, implications of the findings include the importance of implementation strategies, such as long-term planning, coalition building, clarifying roles and expectations, planned adaptation, evaluation, diversification of financing strategies, and incentivizing implementation.
20 CFR 631.40 - State program operational plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State program operational plan. 631.40 Section 631.40 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS... Federal-State Unemployment Compensation System, the Trade Adjustment Assistance Program, the State...
45 CFR 1304.51 - Management systems and procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... program planning that includes consultation with the program's governing body, policy groups, and program... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...-income families with young children. Program planning must include: (i) An assessment of community...
The Pilot Land Data System: Report of the Program Planning Workshops
NASA Technical Reports Server (NTRS)
1984-01-01
An advisory report to be used by NASA in developing a program plan for a Pilot Land Data System (PLDS) was developed. The purpose of the PLDS is to improve the ability of NASA and NASA sponsored researchers to conduct land-related research. The goal of the planning workshops was to provide and coordinate planning and concept development between the land related science and computer science disciplines, to discuss the architecture of the PLDs, requirements for information science technology, and system evaluation. The findings and recommendations of the Working Group are presented. The pilot program establishes a limited scale distributed information system to explore scientific, technical, and management approaches to satisfying the needs of the land science community. The PLDS paves the way for a land data system to improve data access, processing, transfer, and analysis, which land sciences information synthesis occurs on a scale not previously permitted because of limits to data assembly and access.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
ERIC Educational Resources Information Center
State Univ. of New York, Buffalo. Western New York School Study Council.
Although the public is best served by governmental agencies which have integrated the major functions of planning, managing, and budgeting, it can be asserted that the planning function is paramount. A review of the evolution of public agency administration in the U.S. reveals that until recent years the planning function has been largely…
NASA Technical Reports Server (NTRS)
1992-01-01
NASA science publications have used the metric system of measurement since 1970. Although NASA has maintained a metric use policy since 1979, practical constraints have restricted actual use of metric units. In 1988, an amendment to the Metric Conversion Act of 1975 required the Federal Government to adopt the metric system except where impractical. In response to Public Law 100-418 and Executive Order 12770, NASA revised its metric use policy and developed this Metric Transition Plan. NASA's goal is to use the metric system for program development and functional support activities to the greatest practical extent by the end of 1995. The introduction of the metric system into new flight programs will determine the pace of the metric transition. Transition of institutional capabilities and support functions will be phased to enable use of the metric system in flight program development and operations. Externally oriented elements of this plan will introduce and actively support use of the metric system in education, public information, and small business programs. The plan also establishes a procedure for evaluating and approving waivers and exceptions to the required use of the metric system for new programs. Coordination with other Federal agencies and departments (through the Interagency Council on Metric Policy) and industry (directly and through professional societies and interest groups) will identify sources of external support and minimize duplication of effort.
DOT National Transportation Integrated Search
2007-02-14
This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...
National ITS Program Plan Executive Summary
DOT National Transportation Integrated Search
1995-03-01
THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPARTMEN...
Outcomes of a career planning and development program for registered nurses.
Hall, Linda McGillis; Waddell, Janice; Donner, Gail; Wheeler, Mary M
2004-01-01
The impact of a career planning and development program (CPDP) for registered nurses (RNs) on nurse and system outcomes was examined. The CPDP was effective as participants were able to create a career vision and individualized career plan.
Planning Student Flow with Linear Programming: A Tunisian Case Study.
ERIC Educational Resources Information Center
Bezeau, Lawrence
A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…
Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
1972-01-01
The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.
Workshop proceedings: Information Systems for Space Astrophysics in the 21st Century, volume 1
NASA Technical Reports Server (NTRS)
Cutts, James (Editor); Ng, Edward (Editor)
1991-01-01
The Astrophysical Information Systems Workshop was one of the three Integrated Technology Planning workshops. Its objectives were to develop an understanding of future mission requirements for information systems, the potential role of technology in meeting these requirements, and the areas in which NASA investment might have the greatest impact. Workshop participants were briefed on the astrophysical mission set with an emphasis on those missions that drive information systems technology, the existing NASA space-science operations infrastructure, and the ongoing and planned NASA information systems technology programs. Program plans and recommendations were prepared in five technical areas: Mission Planning and Operations; Space-Borne Data Processing; Space-to-Earth Communications; Science Data Systems; and Data Analysis, Integration, and Visualization.
Space Station - An integrated approach to operational logistics support
NASA Technical Reports Server (NTRS)
Hosmer, G. J.
1986-01-01
Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.
Assessment of the NASA AvSTAR Project Plan
NASA Technical Reports Server (NTRS)
Ulrey, Michael L.; Haraldsdottir, Aslaug; Berge, Matthew E.; Hopperstad, Craig A.; Schwab, Robert W.
2004-01-01
This report is a preliminary evaluation of NASA's proposed Aviation System Technology Advanced Research (AvSTAR) Program during the early stages of its definition, in the first half of the year 2001. This evaluation focuses on how well the program goals address the needs of the U.S. National Airspace System, the technical feasibility of the program goals, and the logistical feasibility of the program plan. This report also provides recommendations on how the AvSTAR program could be strengthened and improved. This document has two appendices.
NASA's Solar System Exploration Program
NASA Technical Reports Server (NTRS)
Robinson, James
2005-01-01
A viewgraph presentation describing NASA's Solar System Exploration Program is shown. The topics include: 1) Solar System Exploration with Highlights and Status of Programs; 2) Technology Drivers and Plans; and 3) Summary
Succession Planning: A Doctoral Program Partnership for Emerging Community College Leaders
ERIC Educational Resources Information Center
Luna, Gaye
2010-01-01
This article describes a doctoral program partnership between a university and a community college district that addresses the need of employment-planning strategies for building leadership capacity in the community college system. Succession planning information is provided as a foundational framework to plan for the next generation of community…
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2011 CFR
2011-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2012 CFR
2012-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2014 CFR
2014-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2013 CFR
2013-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
Automated process planning system
NASA Technical Reports Server (NTRS)
Mann, W.
1978-01-01
Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.
76 FR 42536 - Real-Time System Management Information Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...
F14A System Safety Program Plan
1981-09-03
by block number) Electromagnetic Pulse (EMP) Safety Plans Test Program EMP Testing F14 Aircraft Plans 20 ABSTRACT (Continue on reverse side if...compromising completion of the required experimental tasks. This document addresses the safety aspect of performing an Electromagnetic Pulse (EMP) test
NASA Astrophysics Data System (ADS)
Kouziokas, Georgios N.
2016-09-01
It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.
Comparative costs of family planning services and hospital-based maternity care in Turkey.
Cakir, H V; Fabricant, S J; Kircalioğlu, F N
1996-01-01
The costs of running a recently established family planning program in the Turkish social security system were measured and compared with the costs of providing the medical services and nonmedical benefits for pregnant women. The undiscounted cost savings from averting pregnancy were estimated to exceed the program's recurrent costs by 17.6 to 1. Cost savings represent only 1 percent of all of the system's medical expenditures, but the family planning program is in an early stage, and potential savings could influence management decisionmaking regarding investments in specialized maternity hospitals.
An efficient inverse radiotherapy planning method for VMAT using quadratic programming optimization.
Hoegele, W; Loeschel, R; Merkle, N; Zygmanski, P
2012-01-01
The purpose of this study is to investigate the feasibility of an inverse planning optimization approach for the Volumetric Modulated Arc Therapy (VMAT) based on quadratic programming and the projection method. The performance of this method is evaluated against a reference commercial planning system (eclipse(TM) for rapidarc(TM)) for clinically relevant cases. The inverse problem is posed in terms of a linear combination of basis functions representing arclet dose contributions and their respective linear coefficients as degrees of freedom. MLC motion is decomposed into basic motion patterns in an intuitive manner leading to a system of equations with a relatively small number of equations and unknowns. These equations are solved using quadratic programming under certain limiting physical conditions for the solution, such as the avoidance of negative dose during optimization and Monitor Unit reduction. The modeling by the projection method assures a unique treatment plan with beneficial properties, such as the explicit relation between organ weightings and the final dose distribution. Clinical cases studied include prostate and spine treatments. The optimized plans are evaluated by comparing isodose lines, DVH profiles for target and normal organs, and Monitor Units to those obtained by the clinical treatment planning system eclipse(TM). The resulting dose distributions for a prostate (with rectum and bladder as organs at risk), and for a spine case (with kidneys, liver, lung and heart as organs at risk) are presented. Overall, the results indicate that similar plan qualities for quadratic programming (QP) and rapidarc(TM) could be achieved at significantly more efficient computational and planning effort using QP. Additionally, results for the quasimodo phantom [Bohsung et al., "IMRT treatment planning: A comparative inter-system and inter-centre planning exercise of the estro quasimodo group," Radiother. Oncol. 76(3), 354-361 (2005)] are presented as an example for an extreme concave case. Quadratic programming is an alternative approach for inverse planning which generates clinically satisfying plans in comparison to the clinical system and constitutes an efficient optimization process characterized by uniqueness and reproducibility of the solution.
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. Center for Vocational Education.
This package of camera ready masters is one of a set of twelve documents describing the Career Planning Support System (CPSS) and its use. (CPSS is a comprehensive guidance program management system which (1) provides techniques to improve a high school's career guidance program, (2) focuses on the skills students need to make decisions about and…
Using planned adaptation to implement evidence-based programs with new populations.
Lee, Shawna J; Altschul, Inna; Mowbray, Carol T
2008-06-01
The Interactive Systems Framework (ISF) for Dissemination and Implementation (Wandersman et al. 2008) elaborates the functions and structures that move evidence-based programs (EBPs) from research to practice. Inherent in that process is the tension between implementing programs with fidelity and the need to tailor programs to fit the target population. We propose Planned Adaptation as one approach to resolve this tension, with the goal of guiding practitioners in adapting EBPs so that they maintain core components of program theory while taking into account the needs of particular populations. Planned Adaptation is a form of capacity building within the Prevention Support System that provides a framework to guide practitioners in adapting programs while encouraging researchers to provide information relevant to adaptation as a critical aspect of dissemination research, with the goal of promoting wider dissemination and better implementation of EBPs. We illustrate Planned Adaptation using the JOBS Program (Caplan et al. 1989), which was developed for recently laid-off, working- and middle-class workers and subsequently implemented with welfare recipients.
Mod-2 wind turbine system cluster research test program. Volume 1: Initial plan E-1290
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1982-01-01
Upon completion of the design and development of three Mod-2 wind turbines, a series of research experiments are planned to gather data on and evaluate the performance, environmental effects, and operation of a cluster as well as a single, large multimegawatt wind turbine. Information on the program objectives, a Mod-2 system description, a planned schedule, organizational roles, and responsibilities, is included.
Programs of Study and Support Services Guide. Workforce Development Education.
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh.
This document was developed to assist local school systems in North Carolina in planning effective and comprehensive workforce development education programs. It contains information about planning, required resources, instructional guidelines, and program area offerings. The guide is organized in three parts. Part I provides a program description…
Programs for skyline planning.
Ward W. Carson
1975-01-01
This paper describes four computer programs for the logging engineer's use in planning log harvesting by skyline systems. One program prepares terrain profile plots from maps mounted on a digitizer; the other programs prepare load-carrying capability and other information for single and multispan standing skylines and single span running skylines. In general, the...
Projecting Program Cost Over an Adequate Time Horizon.
ERIC Educational Resources Information Center
Spencer, Milton
Planning Programming Budgeting Systems involve the introduction of three major operational concepts. First, the development of an analytical capability to examine in depth both agency objectives and the various programs to meet these objectives. Second, the formation of a five-year planning and programming process combined with a sophisticated…
SPECS 2. Component Two: Program Budgeting and Cost Accounting.
ERIC Educational Resources Information Center
DuVall, Lloyd A.
The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. Component…
2004-06-01
11 Table 2. Main Macroeconomic Indicators of the State Budget (From: Ref. 21) ...........13 Table 3. State Budget Expenditures...programs with alternative options and Budget Estimations - called Planning, Programming and Budget System (PPBS). The principles and main idea of Defense...about the political fundamentals of building the state, market economy principles , and the advantages of globalization. Georgia was among the first
ERIC Educational Resources Information Center
Watt, Michael G.
This evaluation project presents a plan for a program to establish a clearinghouse for exchanging qualitative and quantitative data on instructional materials used in Australian schools. A range of elements necessary to plan a program suited to Australian requirements and conditions was investigated. Focus was on: the program's mission,…
DOT National Transportation Integrated Search
1997-12-01
In the fall of 1997, the ITS Professional Capacity Building Program initiated the development of six White Papers to briefly describe the current status of, and plans for future education and training activities of six organizations engaged in ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-06
... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...
NASA Year 2000 (Y2K) Program Plan
NASA Technical Reports Server (NTRS)
1998-01-01
NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.
Preoperative Planning of Orthopedic Procedures using Digitalized Software Systems.
Steinberg, Ely L; Segev, Eitan; Drexler, Michael; Ben-Tov, Tomer; Nimrod, Snir
2016-06-01
The progression from standard celluloid films to digitalized technology led to the development of new software programs to fulfill the needs of preoperative planning. We describe here preoperative digitalized programs and the variety of conditions for which those programs can be used to facilitate preparation for surgery. A PubMed search using the keywords "digitalized software programs," "preoperative planning" and "total joint arthroplasty" was performed for all studies regarding preoperative planning of orthopedic procedures that were published from 1989 to 2014 in English. Digitalized software programs are enabled to import and export all picture archiving communication system (PACS) files (i.e., X-rays, computerized tomograms, magnetic resonance images) from either the local working station or from any remote PACS. Two-dimension (2D) and 3D CT scans were found to be reliable tools with a high preoperative predicting accuracy for implants. The short learning curve, user-friendly features, accurate prediction of implant size, decreased implant stocks and low-cost maintenance makes digitalized software programs an attractive tool in preoperative planning of total joint replacement, fracture fixation, limb deformity repair and pediatric skeletal disorders.
ERIC Educational Resources Information Center
Hunt, Lester W.; Burr, Donald F.
The Simu-School Program and the National Center for Educational Planning were conceived because of the need for (1) expertise in educational planning, (2) a system to collect and assemble the vast amount of knowledge concerning education, (3) community involvement in planning, and (4) a system to accurately interpret today's data in planning for…
Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
Some guidance on preparing validation plans for the DART Full System Models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy
2009-03-01
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less
SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 5: Human Support
NASA Technical Reports Server (NTRS)
1991-01-01
Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft integrated technology plan (ITP) on human support are included. Topics covered include: human support program; human factors; life support technology; fire safety; medical support technology; advanced refrigeration technology; EVA suit system; advanced PLSS technology; and ARC-EVA systems research program.
45 CFR 1304.51 - Management systems and procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... control program quality, maintain program accountability, and advise governing bodies, policy groups, and... DELEGATE AGENCIES Program Design and Management § 1304.51 Management systems and procedures. (a) Program... program planning that includes consultation with the program's governing body, policy groups, and program...
Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviewsmore » the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.« less
A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki
NASA Technical Reports Server (NTRS)
Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher
2010-01-01
The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2011 CFR
2011-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2012 CFR
2012-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2013 CFR
2013-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less
Sillah, Nyama M; Ibrahim, Ahmed M S; Lau, Frank H; Shah, Jinesh; Medin, Caroline; Lee, Bernard T; Lin, Samuel J
2015-07-01
The Accreditation Council for Graduate Medical Education Next Accreditation System milestones were implemented for plastic surgery programs in July of 2014. Forward progress through the milestones is an indicator of trainee-appropriate development, whereas regression or stalling may indicate the need for concentrated, targeted training. Online software at www.surveymonkey.com was used to create a survey about the program's approaches to milestones and was distributed to program directors and administrators of 96 Accreditation Council for Graduate Medical Education-approved plastic surgery programs. The authors had a 63.5 percent response rate (61 of 96 plastic surgery programs). Most programs report some level of readiness, only 22 percent feel completely prepared for the Next Accreditation System milestones, and only 23 percent are completely satisfied with their planned approach for compliance. Seventy-five percent of programs claim to be using some form of electronic tracking system. Programs plan to use multiple tools to capture and report milestone data. Most programs (44.4 percent) plan to administer evaluations at the end of each rotation. Over 70 percent of respondents believe that the milestones approach would improve the quality of resident training. However, programs were less than confident that their current compliance systems would live up to their full potential. The Next Accreditation System has been implemented nationwide for plastic surgery training programs. Milestone-based resident training is a new paradigm for residency training evaluation; programs are in the process of making this transition to find ways to make milestone data meaningful for faculty and residents.
Reliability program requirements for aeronautical and space system contractors
NASA Technical Reports Server (NTRS)
1987-01-01
General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.
Accomplishments Under the Airport Improvement Program. Fiscal year 1987.
1987-01-01
APRON PORTLAND INTERNATIONAL JETPORT (PRIMARY) 17 $312,300 INSTALL RUNWAY LIGHTING SYSTEM 1B $1,481,738 EXTENDAPRON PRESQUE ISLE 06 $99,000 RECONSTRUCT...LOCATION AND PROJECT FEDERAL NAME OF AIRPORT NUMBER FUNDS DESCRIPTION OF WORK o PENNSYLVANIA S4 $198,000 CONDUCT STATE SYSTEM PLAN UPDATE COMMONWEALTH...OF PENNSYLVANIA (CONTINUOUS) (SYSTEM PLAN) R5 $200,000 CONDUCT REGIONAL SYSTEM PLAN UPDATE DELAWARE VALLEY REGION (CONTINUOUS) (SYSTEM PLAN) RS
Advanced rural transportation systems (ARTS) : strategic plan
DOT National Transportation Integrated Search
1997-08-01
This Strategic Plan has been developed for the Advanced Rural Transportation Systems (ARTS) portion of the ITS Program. The plan focuses on the Federal Government's role in developing rural ITS options and prudently managing emerging ITS technologies...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
The Charlotte-Mecklenburg Teacher Career Development Program.
ERIC Educational Resources Information Center
Schlechty, Phillip C.; And Others
1985-01-01
Effective training, evaluation, and incentives are key aspects of this school system's six-level career ladder program for teacher development. The three-pronged committee structure for planning and communication and the program's ownership by everyone involved have been vital to its successful planning and development. (DCS)
Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...
1989-08-01
microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and
Planning, Conducting, and Documenting Data Analysis for Program Improvement
ERIC Educational Resources Information Center
Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne
2015-01-01
This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…
A Comprehensive Planning Model and Delivery System for Leadership Training Programs.
ERIC Educational Resources Information Center
Janosik, Steven M.; Sina, Julie A.
1988-01-01
Presents an eight-step planning model that operationally defines a comprehensive delivery systems approach to campuswide leadership training. Lists four goals of the model: to increase efficiency of leadership training through shared resources, to decrease costs, to provide quality control, and to increase impact of programming effort by creating…
The planning and control of NASA programs and resources
NASA Technical Reports Server (NTRS)
1983-01-01
The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.
Technology in education: A guidebook for developing a science and math education support program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, C.L.
1992-09-01
Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less
Technology in education: A guidebook for developing a science and math education support program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, C.L.
1992-09-01
Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less
Manager's assistant systems for space system planning
NASA Technical Reports Server (NTRS)
Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James
1992-01-01
This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.
Space Solar Power Program. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arif, Humayun; Barbosa, Hugo; Bardet, Christophe
1992-08-01
Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
WASTE ANALYSIS PLAN REVIEW ADVISOR - AN INTELLIGENT DATABASE TO ASSIST RCRA PERMIT REVIEWERS
The Waste Analysis Plan Review Advisor (WAPRA) system assists in the review of the Waste Analysis Plan Section of RCRA Part B facility permit applications. Specifically, this program automates two functions of the waste analysis plan review. First, the system checks all wastes wh...
ERIC Educational Resources Information Center
Mercado del Collado, Ricardo
Higher education planning in Mexico is discussed, with attention to: conceptual characteristics of Mexico's higher education planning system; relationships among the national, regional, state, and institutional planning levels; and design and operation of the Comprehensive Program for the Development of Higher Education. Responsibilities of…
LISPA (Library and Information Center Staff Planning Advisor): A Microcomputer-Based System.
ERIC Educational Resources Information Center
Devadason, F. J.; Vespry, H. A.
1996-01-01
Describes LISPA (Library and Information Center Staff Planning Advisor), a set of programs based on Ranganathan's staff plan model. LISPA particularly aids in planning for library staff requirements, both professional and paraprofessional, in developing countries where automated systems for other library operations are not yet available.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, T.; Brandt, C.; Calfee, J.
1994-03-01
The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less
Design controls for large order systems
NASA Technical Reports Server (NTRS)
Doane, George B., III
1991-01-01
The output of this task will be a program plan which will delineate how MSFC will support and implement its portion of the Inter-Center Computational Controls Program Plan. Another output will be the results of looking at various multibody/multidegree of freedom computer programs in various environments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
Air transportation noise technology overview
NASA Technical Reports Server (NTRS)
Maggin, B.; Chestnutt, D.
1973-01-01
The NASA and DOT technology program planning for quieter air transportation systems is reviewed. To put this planning in context, the nature of the noise problem and the projected nature of the air transportation fleet are identified. The technology program planning reviewed here is discussed in relation to the following areas of activity: systems analysis, community acceptance, basic research and technology, and the various classes of civil aircraft, i.e. existing and advanced transports, powered-lift transports, and general aviation.
Effectively marketing prepaid medical care with decision support systems.
Forgionne, G A
1991-01-01
The paper reports a decision support system (DSS) that enables health plan administrators to quickly and easily: (1) manage relevant medical care market (consumer preference and competitors' program) information and (2) convert the information into appropriate medical care delivery and/or payment policies. As the paper demonstrates, the DSS enables providers to design cost efficient and market effective medical care programs. The DSS provides knowledge about subscriber preferences, customer desires, and the program offerings of the competition. It then helps administrators structure a medical care plan in a way that best meets consumer needs in view of the competition. This market effective plan has the potential to generate substantial amounts of additional revenue for the program. Since the system's data base consists mainly of the provider's records, routine transactions, and other readily available documents, the DSS can be implemented at a nominal incremental cost. The paper also evaluates the impact of the information system on the general financial performance of existing dental and mental health plans. In addition, the paper examines how the system can help contain the cost of providing medical care while providing better services to more potential beneficiaries than current approaches.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
NASA Technical Reports Server (NTRS)
Maag, W.
1977-01-01
The Flight Design System (FDS) and the Unified System for Orbit Computation (USOC) are compared and described in relation to mission planning for the shuttle transportation system (STS). The FDS is designed to meet the requirements of a standardized production tool and the USOC is designed for rapid generation of particular application programs. The main emphasis in USOC is put on adaptability to new types of missions. It is concluded that a software system having a USOC-like structure, adapted to the specific needs of MPAD, would be appropriate to support planning tasks in the area unique to STS missions.
Children/Youth Physical Fitness Program Management System.
ERIC Educational Resources Information Center
Mozzini, Lou; And Others
Intended for physical fitness program managers, this book presents a system through which these professionals can justify, evaluate, develop, supervise, and promote a sound physical fitness program. Sections address the management stages of: (1) program assessment; (2) program commitment; (3) physical fitness program planning; (4) program…
Nuclear weapons modernization: Plans, programs, and issues for Congress
NASA Astrophysics Data System (ADS)
Woolf, Amy F.
2017-11-01
The United States is currently recapitalizing each delivery system in its "nuclear triad" and refurbishing many of the warheads carried by those systems. The plans for these modernization programs have raised a number of questions, both within Congress and among analysts in the nuclear weapons and arms control communities, about the costs associated with the programs and the need to recapitalize each leg of the triad at the same time. This paper covers four distinct issues. It begins with a brief review of the planned modernization programs, then addresses questions about why the United States is pursuing all of these modernization programs at this time. It then reviews the debate about how much these modernization programs are likely to cost in the next decade and considers possible changes that might reduce the cost. It concludes with some comments about congressional views on the modernization programs and prospects for continuing congressional support in the coming years.
Priority System for Multimodal and Intermodal Transportation Planning
DOT National Transportation Integrated Search
1997-01-01
Prioritization is an increasingly important concept for transportation system planning and programming. The resources for capital improvements to state and regional transportation systems are stagnant or declining. At the same time, population growth...
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less
AUA Program Master Plan. Volume 1: Overview
DOT National Transportation Integrated Search
1997-03-01
The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...
2014-06-01
21 C . CMMS USE IN THE LCS PROGRAM ......................................................22 D. CBM+ MAINTENANCE MANAGEMENT SYSTEM...45 b. Plan Maintenance Budgeting .................................................45 c . Plan Maintenance Logistics... Maintenance Planning ...................................46 b. Communicate Maintenance Budget .......................................46 c . Communicate
Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan
DOT National Transportation Integrated Search
1977-01-01
The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... Advisory Committee; Notice of Meeting AGENCY: Research and Innovative Technology Administration, U.S... Plan; (5) Evolution of IntelliDrive\\SM\\; (6) ITS Strategic Research Plan, 2010-2014; (7) University... Technology Administration, ITS Joint Program Office, Attention: Stephen Glasscock, 1200 New Jersey Avenue, SE...
Linear Programming for Vocational Education Planning. Interim Report.
ERIC Educational Resources Information Center
Young, Robert C.; And Others
The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…
Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)
ERIC Educational Resources Information Center
National Center for Systemic Improvement at WestEd, 2015
2015-01-01
This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…
Planning and Measurement in School to Work Transition.
ERIC Educational Resources Information Center
Kooi, Beverly Y.
An analysis, development, and research (ADR) approach for planning educational research and development programs was used as a model for planning the National Institute of Education's School-To-Work Transition Program. The ADR model is system oriented and utilizes an iterative approach in which research questions are raised as others are answered.…
Overview and example application of the Landscape Treatment Designer
Alan A. Ager; Nicole M. Vaillant; David E. Owens; Stuart Brittain; Jeff Hamann
2012-01-01
The Landscape Treatment Designer (LTD) is a multicriteria spatial prioritization and optimization system to help design and explore landscape fuel treatment scenarios. The program fills a gap between fire model programs such as FlamMap, and planning systems such as ArcFuels, in the fuel treatment planning process. The LTD uses inputs on spatial treatment objectives,...
ERIC Educational Resources Information Center
Illinois Community Coll. Board, Springfield.
The Illinois Community College System has charted a course for the 21st century that responds to both the individual and community education needs. This plan, named Vision 2000, is the culmination of regional town meetings which clarified five educational goals. It offers liberal arts and sciences programs, occupational programs, developmental…
NASA Technical Reports Server (NTRS)
Bekey, I.; Mayer, H. L.; Wolfe, M. G.
1976-01-01
The methodology of alternate world future scenarios is utilized for selecting a plausible, though not advocated, set of future scenarios each of which results in a program plan appropriate for the respective environment. Each such program plan gives rise to different building block and technology requirements, which are analyzed for common need between the NASA and the DoD for each of the alternate world scenarios. An essentially invariant set of system, building block, and technology development plans is presented at the conclusion, intended to allow protection of most of the options for system concepts regardless of what the actual future world environment turns out to be. Thus, building block and technology needs are derived which support: (1) each specific world scenario; (2) all the world scenarios identified in this study; or (3) generalized scenarios applicable to almost any future environment. The output included in this volume consists of the building blocks, i.e.: transportation vehicles, orbital support vehicles, and orbital support facilities; the technology required to support the program plans; identification of their features which could support the DoD and NASA in common; and a complete discussion of the planning methodology.
ERIC Educational Resources Information Center
Kiser, Chester; And Others
This 2-part document is designed to aid school districts in the implementation of a planning programing budgeting system. The first part of the manual contains (1) statements of policy, (2) a master flowchart, (3) organization and functions of a PPBS system, (4) a flowscript of procedures, (5) job outlines, and (6) supplementary appendix material.…
PLANiTS : structuring and supporting the intelligent transportation systems planning process
DOT National Transportation Integrated Search
1997-01-01
PLANiTS (Planning and Analysis Integration for Intelligent Transportation Systems) is a process-based computer system that supports a series of mutually interdependent steps progressing toward developing and programming transportation improvement pro...
NASA Technical Reports Server (NTRS)
1979-01-01
Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.
State Vocational Education Planning: An Assessment of Issues and Problems.
ERIC Educational Resources Information Center
Lawrence, John E. S., Ed.; Dane, J. K., Ed.
The Dynamic Analysis and Strategic Planning (DASP) Program Division of the Center for Occupational Education at North Carolina State University is concerned with its need for information about the actual operation of planning systems and the development of a planning and information system for vocational education. To this end a three part…
NASA Technical Reports Server (NTRS)
Thalman, Nancy E.; Sparn, Thomas P.
1990-01-01
SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.
MnDOT research program strategic plan 2017-2022.
DOT National Transportation Integrated Search
2017-03-01
In response to the top transportation trends in Minnesota, and opportunities and challenges facing its transportation system, MnDOT has developed this five-year Research Program Strategic Plan (2017 2022) to take stock of its research portfolio, ...
48 CFR 2919.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...
Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Establishing an Environmental Scanning System to Augment College and University Planning.
ERIC Educational Resources Information Center
Morrison, James L.
A plan to establish an environmental scanning and forecasting system for colleges and universities is discussed as a way to maximize long-range planning. After proposing a program structure, attention is directed to methods of gaining organizational acceptance, developing a comprehensive taxonomy with an electronic filing system, identifying and…
Workshop Proceedings: Sensor Systems for Space Astrophysics in the 21st Century, Volume 2
NASA Technical Reports Server (NTRS)
Wilson, Barbara A. (Editor)
1991-01-01
In 1989, the Astrophysics Division of the Office of Space Science and Applications initiated the planning of a technology development program, Astrotech 21, to develop the technological base for the Astrophysics missions developed in the period 1995 to 2015. The Sensor Systems for Space Astrophysics in the 21st Century Workshop was one of three Integrated Technology Planning workshops. Its objectives were to develop an understanding of the future comprehensive development program to achieve the required capabilities. Program plans and recommendations were prepared in four areas: x ray and gamma ray sensors, ultraviolet and visible sensors, direct infrared sensors, and heterodyne submillimeter wave sensors.
Safe teleradiology: information assurance as project planning methodology.
Collmann, Jeff; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2005-01-01
The Georgetown University Medical Center Department of Radiology used a tailored version of OCTAVE, a self-directed information security risk assessment method, to design a teleradiology system that complied with the regulation implementing the security provisions of the Health Insurance Portability and Accountability Act (HIPAA) of 1996. The system addressed threats to and vulnerabilities in the privacy and security of protected health information. By using OCTAVE, Georgetown identified the teleradiology program's critical assets, described threats to the assurance of those assets, developed and ran vulnerability scans of a system pilot, evaluated the consequences of security breaches, and developed a risk management plan to mitigate threats to program assets, thereby implementing good information assurance practices. This case study illustrates the basic point that prospective, comprehensive planning to protect the privacy and security of an information system strategically benefits program management as well as system security.
Techniques for overcoming community resistance to family planning programs.
Palley, H A
1968-01-01
Methods of overcoming resistance to publicly subsidized family planning programs are discussed. The main sources of opposition include groups that oppose family planning for moral reasons, and those who object to the spending of government funds to provide services and information. Such opposition can be weakened by indicating that family planning clinics fulf: 11 important medical needs. Presenting social justification for family planning can help to lower oppostion. In order to secure participation in the programs by low income groups it is essential to have community leaders involved in policy decisions and to use indigenous community paraprofessionals in the clinics. A coalition of representatives of the poor community and the health and welfare system, aided by the community organization, can lead to an effective family planning program.
1984-08-01
recommendations in the report with Martin Marietta over the next few months. Appropriate followup actions will be deter- mined, and any program changes...Technical Feasibility and Validity ...... . . .. 1-6 1.3.2 Program Schedule . . . . . . ......... . .. 1-7 1.3.3 NAS Plan Cost...343.1.1 Overview 3-1 3.1.2 Findings, Risks, and Recommendations . . . . . . . . . 3-3 3.2 Program Schedule . . . . . . . . . . * . . * . *. . 3-6
Electric power system test and verification program
NASA Technical Reports Server (NTRS)
Rylicki, Daniel S.; Robinson, Frank, Jr.
1994-01-01
Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.
NASA Technical Reports Server (NTRS)
1979-01-01
A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...
76 FR 40753 - NASA Advisory Council; Aeronautics Committee; Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
... strategy Verification and Validation of Flight Critical Systems planning update NASA Aeronautics systems analysis and strategic planning It is imperative that this meeting be held on this date to accommodate the... aeronautics community and other persons, research and technical information relevant to program planning...
NASA Astrophysics Data System (ADS)
Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.
2017-11-01
Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.
48 CFR 219.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business firms specifically identified in the subcontracting plan. Notifications shall be in writing and... SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business... business concerns shall include subcontracts with historically black colleges and universities and minority...
Monitored execution of robot plans produced by STRIPS.
NASA Technical Reports Server (NTRS)
Fikes, R. E.
1972-01-01
We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.
Development and Evaluation of Educational Programs in Electromechanical Technology. Final Report.
ERIC Educational Resources Information Center
Roney, M. W.
The encompassing objective of this project was to assist two-year colleges in establishing electromechanical technican (EMT) training programs by developing the necessary planning and instructional materials and by providing direct program planning assistance. The research effort of the project was to develop and test an integrated systems of…
Model Programs: Childhood Education. Project PLAN.
ERIC Educational Resources Information Center
American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.
This booklet is one of 34 in a series of programs on childhood education prepared for the White House Conference on Children. In Parkersburg, West Virginia, Project PLAN (Program for Learning in Accordance with Needs) offers an individualized instructional system designed to enable each student to progress at his own rate, using the learning…
DOT National Transportation Integrated Search
1997-01-01
Congress recently requested the Intelligent Transportation Systems (ITS) Joint Program Office and the National Highway Traffic Safety Administration to update the 1992 ITS plan to deal with the fiscal year 1997 through fiscal year 2002 period, and...
The SKYTOWER and SKYMOBILE programs for locating and designing skyline harvest units.
R.H. Twito; R.J. McGaughey; S.E. Reutebuch
1988-01-01
PLANS, a software package for integrated timber-harvest planning, uses digital terrain models to provide the topographic data needed to fit harvest and transportation designs to specific terrain. SKYTOWER and SKYMOBILE are integral programs in the PLANS package and are used to design the timber-harvest units for skyline systems. SKYTOWER determines skyline payloads and...
ERIC Educational Resources Information Center
Rice, Eric; And Others
This guidebook focuses on the first of five steps included in a planning system for improving local secondary and postsecondary program and facilities accessibility: identifying barriers. The first five sections of the booklet are comprised of self-instructional descriptions of five needs-assessment procedures that can be used to identify…
ERIC Educational Resources Information Center
Rice, Eric; And Others
This guidebook focuses on the third of five steps included in a planning system for improving local secondary and postsecondary program and facilities accessibility: generating strategies. The guidebook is comprised of four sections, each describing a specific technique for generating strategies. Techniques presented are (1) nominal group…
ERIC Educational Resources Information Center
Boyle, Todd A.
2007-01-01
In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…
ERIC Educational Resources Information Center
Stone, Matthew
2011-01-01
The Network for a Healthy California (Network) employs a Geographic Information System (GIS) to identify the target audience and plan program activities because GIS is a powerful tool for assisting in data integration and planning. This paper describes common uses of GIS by Network contractors as well as demonstrating the possibilities of GIS as a…
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
49 CFR 659.15 - System safety program standard.
Code of Federal Regulations, 2011 CFR
2011-10-01
... included in the affected rail transit agency's system safety program plan relating to the hazard management... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program standard. 659.15 Section 659... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the...
Software for Optimizing Plans Involving Interdependent Goals
NASA Technical Reports Server (NTRS)
Estlin, Tara; Gaines, Daniel; Rabideau, Gregg
2005-01-01
A computer program enables construction and optimization of plans for activities that are directed toward achievement of goals that are interdependent. Goal interdependence is defined as the achievement of one or more goals affecting the desirability or priority of achieving one or more other goals. This program is overlaid on the Automated Scheduling and Planning Environment (ASPEN) software system, aspects of which have been described in a number of prior NASA Tech Briefs articles. Unlike other known or related planning programs, this program considers interdependences among goals that can change between problems and provides a language for easily specifying such dependences. Specifications of the interdependences can be formulated dynamically and provided to the associated planning software as part of the goal input. Then an optimization algorithm provided by this program enables the planning software to reason about the interdependences and incorporate them into an overall objective function that it uses to rate the quality of a plan under construction and to direct its optimization search. In tests on a series of problems of planning geological experiments by a team of instrumented robotic vehicles (rovers) on new terrain, this program was found to enhance plan quality.
1981-03-01
tasterls I4fhesis EIEY SYSTEM (TEDS) ZETHOD OF INSTRUC- ~ - ION FOR SYS 22 J3YSTEX PROGRAM MANAGEMEN .PrFOMN ,7WRWUME // John E.Aie Captain, USAF 3...Hypotheses .. .................. 13 II. METHODOLOGY. ................... 14 Sampling Plan. .................. 14 Student and Faculty Populations ...begins with a discussion of the sampling plan and student and faculty populations . This is followed by an explanation of the experimental design and
Achieving Maximum Integration Utilizing Requirements Flow Down
NASA Technical Reports Server (NTRS)
Archiable, Wes; Askins, Bruce
2011-01-01
A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.
ERIC Educational Resources Information Center
Development Planning and Research Associates, Inc., Manhattan, KS.
This manual provides materials for a two-week inservice training program for Peace Corps volunteers on the planning, construction, and operation and maintenance of small-scale irrigation systems. The workshop is designed to be given by two experienced professionals: one with practical knowledge of irrigation system design, operation, and…
Schelbe, Lisa; Randolph, Karen A; Yelick, Anna; Cheatham, Leah P; Groton, Danielle B
2018-01-01
Increased attention to former foster youth pursuing post-secondary education has resulted in the creation of college campus based support programs to address their need. However, limited empirical evidence and theoretical knowledge exist about these programs. This study seeks to describe the application of systems theory as a framework for examining a college campus based support program for former foster youth. In-depth semi-structured interviews were conducted with 32 program stakeholders including students, mentors, collaborative members, and independent living program staff. Using qualitative data analysis software, holistic coding techniques were employed to analyze interview transcripts. Then applying principles of extended case method using systems theory, data were analyzed. Findings suggest systems theory serves as a framework for understanding the functioning of a college campus based support program. The theory's concepts help delineate program components and roles of stakeholders; outline boundaries between and interactions among stakeholders; and identify program strengths and weakness. Systems theory plays an important role in identifying intervention components and providing a structure through which to identify and understand program elements as a part of the planning process. This study highlights the utility of systems theory as a framework for program planning and evaluation.
NASA Technical Reports Server (NTRS)
Ferlita, F.
1989-01-01
The Advanced Launch Systems (ALS) Advanced Development Oxidizer Turbopump Program has designed, fabricated and demonstrated a low cost, highly reliable oxidizer turbopump for the Space Transportation Engine that minimizes the recurring cost for the ALS engines. Pratt and Whitney's (P and W's) plan for integrating the analyses, testing, fabrication, and other program efforts is addressed. This plan offers a comprehensive description of the total effort required to design, fabricate, and test the ALS oxidizer turbopump. The proposed ALS oxidizer turbopump reduces turbopump costs over current designs by taking advantage of design simplicity and state-of-the-art materials and producibility features without compromising system reliability. This is accomplished by selecting turbopump operating conditions that are within known successful operating regions and by using proven manufacturing techniques.
Solar power satellite system definition study, phase 2. Part 1: Midterm briefing
NASA Technical Reports Server (NTRS)
1979-01-01
An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Representatives, or equivalent positions. (c) The program shall include: (1) Management information system... acquisition workforce management information system. (2) Individual assessments and development plans for... Acquisition Career Management Program. 2801.603-1 Section 2801.603-1 Federal Acquisition Regulations System...
A contemporary view of systems engineering. [definition of system and discussion of systems approach
NASA Technical Reports Server (NTRS)
Miles, R. F., Jr.
1974-01-01
The concept of a 'system' is defined, and the 'systems approach' is discussed. Four contemporary examples of the systems approach are presented: an operations research project, the planning-programming-budgeting system, an information processing system, and aerospace programs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...
Space station systems technology study (add-on task). Volume 3: Technology advancement program plan
NASA Technical Reports Server (NTRS)
1985-01-01
Program plans are given for an integrating controller for space station autonomy as well as for controls and displays. The technical approach, facility requirements and candidate facilities, development schedules, and resource requirements estimates are given.
Selenide isotope generator for the Galileo mission. Reliability program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-10-01
The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less
NASA Technical Reports Server (NTRS)
Knighton, Donna L.
1992-01-01
A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.
36 CFR 219.14 - Involvement of State and local governments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...
36 CFR 219.14 - Involvement of State and local governments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
The WSMR Timing System: Toward New Horizons
NASA Technical Reports Server (NTRS)
Gilbert, William A.; Stimets, Bob
1996-01-01
In 1991, White Sands Missile Range (WSMR) initiated a modernization program for its range timing system. The main focus of this modernization program was to develop a system that was highly accurate, easy to maintain, and portable. The logical decision at the time was to develop a system based solely on Global Positioning System (GPS) technology. Since that time, wsmr has changed its philosophy on how GPS would be utilized for the timing system. This paper will describe WSMR's initial modernization plans for its range timing system and how certain events have led to a modification of these plans.
Toward a space materials systems program
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G. F.
1981-01-01
A program implementation model is presented which covers the early stages of space material processing and manufacturing. The model includes descriptions of major program elements, development and experiment requirements in space materials processing and manufacturing, and an integration of the model into NASA's long range plans as well as its evolution from present Materials Processing in Space plans.
Solar power satellite system definition study, phase 2.
NASA Technical Reports Server (NTRS)
1979-01-01
A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.
Virtual university applied to telesurgery: from teleeducation to telemanipulation.
Marescaux, J; Soler, L; Mutter, D; Leroy, J; Vix, M; Koehl, C; Clément, J M
2000-01-01
PROBLEM/BACKGROUND: In order to improve patient care by minimal invasive surgery (MIS), we perfected a Virtual TeleSurgical University that allows for teleeducation, teleconcertation, surgical planning and telemanipulation, through new Virtual Reality and multimedia systems. The organization of this innovative school was federated around three major research programs. First, the TESUS program focused on the teletransmission of medical information, allowing for videoconferencing around the world and telementoring. Next, the WeBS-Surg program is a multimedia continuous surgical education system on internet, that allows for teleeducation and teleconcertation between world experts in MIS. Then, the MASTER program (Minimal Access Surgery by Telecommunications and Robotics) allowed the development of the third millenium Operating room. It included Virtual Reality systems that delineate automatically anatomical and pathological structures of a patients from him CT-scan, and that allow for an interactive surgical planning and force-feed-back simulation. It also included a telesurgical robot named Zeus controlled by surgeons through telemanipulation system. Tests and validation shows that all these systems improved all steps of the surgical procedure: preoperatively due to a better continuous education and a computer assisted surgical planning, and peroperatively due to teleconcertation, telementoring and telemanipulation systems. Revolutionary tools for minimal invasive surgery learning, planning and performing are all ready available. These tools represents the first prototype of the computer assisted tele-robotical surgery that will be the future of surgery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schuster, E.G.; Jones, J.G.; Meacham, M.L.
1995-08-01
Presents a guide to operation and interpretation of TSPAS Sale Program (TSPAS SP), a menu-driven computer program that is one of two programs in the Timber Sale Planning and Analysis System. TSPAS SP is intended to help field teams design and evaluate timber sale alternatives. TSPAS SP evaluate current and long-term timber implications along with associated nontimber outputs. Features include multiple entries and products, real value change, and graphical input. Guide includes user instructions, a glossary, a listing of data needs, and an explanation of error messages.
Evaluation of a data dictionary system. [information dissemination and computer systems programs
NASA Technical Reports Server (NTRS)
Driggers, W. G.
1975-01-01
The usefulness was investigated of a data dictionary/directory system for achieving optimum benefits from existing and planned investments in computer data files in the Data Systems Development Branch and the Institutional Data Systems Division. Potential applications of the data catalogue system are discussed along with an evaluation of the system. Other topics discussed include data description, data structure, programming aids, programming languages, program networks, and test data.
Intelligent transportation systems (ITS) : program and projects
DOT National Transportation Integrated Search
1997-07-01
This is a brief outline of the current projects and programs related to the Intelligent Transportation Systems (ITS) initiatives, formerly known as Intelligent Vehicle Highway Systems (IVHS), being planned, developed, or implemented by the Michigan D...
The San Francisco Joint Institutional Transportation Systems Management Program.
ERIC Educational Resources Information Center
Fink, Ira; LaPointe, Robert
1981-01-01
Transportation systems management (TSM) programs are discussed, particularly the 1977 program of the University of California, San Francisco, which led to traffic reduction and improved vehicle flow. The city's implementation plan for a similar TSM program for 14 educational institutions and hospitals is described. (MLW)
Planning for Multiagent Using ASP-Prolog
NASA Astrophysics Data System (ADS)
Son, Tran Cao; Pontelli, Enrico; Nguyen, Ngoc-Hieu
This paper presents an Answer Set Programming based approach to multiagent planning. The proposed methodology extends the action language \\cal B in [12] to represent and reason about plans with cooperative actions of an individual agent operating in a multiagent environment. This language is used to formalize multiagent planning problems and the notion of a joint plan for multiagent in the presence of cooperative actions. Finally, the paper presents a system for computing joint plans based on the ASP-Prolog system.
Code of Federal Regulations, 2012 CFR
2012-04-01
... that the parties involved in carrying out the planning, programming and management systems processes... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems § 470.103 Definitions. Except as otherwise provided in this part, terms defined in 23 U.S...
Strategic Information Systems Planning.
ERIC Educational Resources Information Center
Rowley, Jennifer
1995-01-01
Strategic Information Systems Planning (SISP) is the process of establishing a program for implementation and use of information systems in ways that will optimize effectiveness of information resources and use them to support the objectives of the organization. Basic steps in SISP methodology are outlined. (JKP)
A Generalized-Compliant-Motion Primitive
NASA Technical Reports Server (NTRS)
Backes, Paul G.
1993-01-01
Computer program bridges gap between planning and execution of compliant robotic motions developed and installed in control system of telerobot. Called "generalized-compliant-motion primitive," one of several task-execution-primitive computer programs, which receives commands from higher-level task-planning programs and executes commands by generating required trajectories and applying appropriate control laws. Program comprises four parts corresponding to nominal motion, compliant motion, ending motion, and monitoring. Written in C language.
Developing a Graphical User Interface for the ALSS Crop Planning Tool
NASA Technical Reports Server (NTRS)
Koehlert, Erik
1997-01-01
The goal of my project was to create a graphical user interface for a prototype crop scheduler. The crop scheduler was developed by Dr. Jorge Leon and Laura Whitaker for the ALSS (Advanced Life Support System) program. The addition of a system-independent graphical user interface to the crop planning tool will make the application more accessible to a wider range of users and enhance its value as an analysis, design, and planning tool. My presentation will demonstrate the form and functionality of this interface. This graphical user interface allows users to edit system parameters stored in the file system. Data on the interaction of the crew, crops, and waste processing system with the available system resources is organized and labeled. Program output, which is stored in the file system, is also presented to the user in performance-time plots and organized charts. The menu system is designed to guide the user through analysis and decision making tasks, providing some help if necessary. The Java programming language was used to develop this interface in hopes of providing portability and remote operation.
29 CFR 1952.383 - Completion of developmental steps and certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., March, 1978. (g) Adopt the Field Operations Manual, April, 1980. (h) Adopt management information system... plan personnel by March, 1978. (b) Public information program (private sector), one year after plan..., August, 1978. (k) Public information program (government sector), February, 1980. (l) Analysis for...
CMIF ECLS system test findings
NASA Technical Reports Server (NTRS)
Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.
1989-01-01
During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
State University System of Florida
ERIC Educational Resources Information Center
Board of Governors, State University System of Florida, 2012
2012-01-01
This paper presents some information about the State University System of Florida. The following are presented in this paper: (1) University Work Plans and Annual Reports; (2) State University System 2009 Annual Report; (3) Quick Facts: Planned New Degree Programs--2010 to 2013; (4) State University System Tuition Differential Summary, FY…
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
Shuttle environmental and thermal control/life support system computer program, supplement 1
NASA Technical Reports Server (NTRS)
Ayotte, W. J.
1975-01-01
The computer programs developed to simulate the RSECS (Representative Shuttle Environmental Control System) were described. These programs were prepared to provide pretest predictions, post-test analysis and real time problem analysis for RSECS test planning and evaluation.
Rapid transit system noise abatement program
DOT National Transportation Integrated Search
1972-01-01
This program plan describes a broad program for the reduction of noise and vibration in rapid transit systems, which impacts the patrons and inhabitants of the nearby commuity. An UMTA/TSC survey has provided data on the most urgent needs and state-o...
How Many Will Choose? School Choice and Student Enrollment Planning.
ERIC Educational Resources Information Center
Chan, Tak C.
1993-01-01
Enrollment planning is the basis of all school system planning. Focuses on assessing the impact of a choice plan on student enrollment planning. Issues involved include home schooling, school employees' choice, and private kindergarten programs. Administrators are advised to evaluate existing forecasting methodologies. (MLF)
Network Speech Systems Technology Program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1980-09-01
This report documents work performed during FY 1980 on the DCA-sponsored Network Speech Systems Technology Program. The areas of work reported are: (1) communication systems studies in Demand-Assignment Multiple Access (DAMA), voice/data integration, and adaptive routing, in support of the evolving Defense Communications System (DCS) and Defense Switched Network (DSN); (2) a satellite/terrestrial integration design study including the functional design of voice and data interfaces to interconnect terrestrial and satellite network subsystems; and (3) voice-conferencing efforts dealing with support of the Secure Voice and Graphics Conferencing (SVGC) Test and Evaluation Program. Progress in definition and planning of experiments for the Experimental Integrated Switched Network (EISN) is detailed separately in an FY 80 Experiment Plan Supplement.
DOT National Transportation Integrated Search
2017-03-01
The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...
25 CFR 170.503 - How are IRR Program management systems funded?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program management systems funded? 170.503 Section 170.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...
Test Planning Approach and Lessons
NASA Technical Reports Server (NTRS)
Parkinson, Douglas A.; Brown, Kendall K.
2004-01-01
As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.
The HIGHLEAD program: locating and designing highlead harvest units by using digital terrain models.
R.H. Twito; S.E. Reutebuch; R.J. McGaughey
1988-01-01
PLANS, a software package for integrated timber-harvest planning, uses digital terrain models to provide the topographic data needed to fit harvest and transportation designs to specific terrain. HIGHLEAD, an integral program in the PLANS package, is used to design the timber-harvest units to be yarded by highlead systems. It solves for the yarding limits of direct...
Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-10-01
This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less
Tank waste remediation system systems engineering management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peck, L.G.
1998-01-08
This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less
NASA Technical Reports Server (NTRS)
Hamilton, M. H.
1971-01-01
The data links for use with the guidance system operations plan for manned command module earth orbital and lunar missions using program Colossus 3 are presented. The subjects discussed are: (1) digital uplink to CMC, (2) command module contiguous block update, (3) CMC retrofire external data update, (4) CMC digital downlink, and (5) CMC entry update.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
NASA Astrophysics Data System (ADS)
Xing, Aitang; Arumugam, Sankar; Holloway, Lois; Goozee, Gary
2014-03-01
Scripting in radiotherapy treatment planning systems not only simplifies routine planning tasks but can also be used for clinical research. Treatment planning scripting can only be utilized in a system that has a built-in scripting interface. Among the commercially available treatment planning systems, Pinnacle (Philips) and Raystation (Raysearch Lab.) have inherent scripting functionality. CMS XiO (Elekta) is a widely used treatment planning system in radiotherapy centres around the world, but it does not have an interface that allows the user to script radiotherapy plans. In this study an external scripting interface, PyCMSXiO, was developed for XiO using the Python programming language. The interface was implemented as a python package/library using a modern object-oriented programming methodology. The package was organized as a hierarchy of different classes (objects). Each class (object) corresponds to a plan object such as the beam of a clinical radiotherapy plan. The interface of classes was implemented as object functions. Scripting in XiO using PyCMSXiO is comparable with Pinnacle scripting. This scripting package has been used in several research projects including commissioning of a beam model, independent three-dimensional dose verification for IMRT plans and a setup-uncertainty study. Ease of use and high-level functions provided in the package achieve a useful research tool. It was released as an open-source tool that may benefit the medical physics community.
How Does a Multi-Site Institution Plan Effectively?
ERIC Educational Resources Information Center
Jefferson, Curtis F.
A multi-site college plans effectively by having in place planning and evaluation systems that enhance its capability to respond effectively to changes in the environment in order to continue to provide high quality educational programs and services for the people in its service area. The effectiveness of these systems is dependent on clearly…
Wang, Henry; Xing, Lei
2016-11-08
An autopilot scheme of volumetric-modulated arc therapy (VMAT)/intensity-modulated radiation therapy (IMRT) planning with the guidance of prior knowl-edge is established with recorded interactions between a planner and a commercial treatment planning system (TPS). Microsoft (MS) Visual Studio Coded UI is applied to record some common planner-TPS interactions as subroutines. The TPS used in this study is a Windows-based Eclipse system. The interactions of our application program with Eclipse TPS are realized through a series of subrou-tines obtained by prerecording the mouse clicks or keyboard strokes of a planner in operating the TPS. A strategy to autopilot Eclipse VMAT/IMRT plan selection process is developed as a specific example of the proposed "scripting" method. The autopiloted planning is navigated by a decision function constructed with a reference plan that has the same prescription and similar anatomy with the case at hand. The calculation proceeds by alternating between the Eclipse optimization and the outer-loop optimization independent of the Eclipse. In the C# program, the dosimetric characteristics of a reference treatment plan are used to assess and modify the Eclipse planning parameters and to guide the search for a clinically sensible treatment plan. The approach is applied to plan a head and neck (HN) VMAT case and a prostate IMRT case. Our study demonstrated the feasibility of application programming method in C# environment with recorded interactions of planner-TPS. The process mimics a planner's planning process and automatically provides clinically sensible treatment plans that would otherwise require a large amount of manual trial and error of a planner. The proposed technique enables us to harness a commercial TPS by application programming via the use of recorded human computer interactions and provides an effective tool to greatly facilitate the treatment planning process. © 2016 The Authors.
Wang, Henry
2016-01-01
An autopilot scheme of volumetric‐modulated arc therapy (VMAT)/intensity‐modulated radiation therapy (IMRT) planning with the guidance of prior knowledge is established with recorded interactions between a planner and a commercial treatment planning system (TPS). Microsoft (MS) Visual Studio Coded UI is applied to record some common planner‐TPS interactions as subroutines. The TPS used in this study is a Windows‐based Eclipse system. The interactions of our application program with Eclipse TPS are realized through a series of subroutines obtained by prerecording the mouse clicks or keyboard strokes of a planner in operating the TPS. A strategy to autopilot Eclipse VMAT/IMRT plan selection process is developed as a specific example of the proposed “scripting” method. The autopiloted planning is navigated by a decision function constructed with a reference plan that has the same prescription and similar anatomy with the case at hand. The calculation proceeds by alternating between the Eclipse optimization and the outer‐loop optimization independent of the Eclipse. In the C# program, the dosimetric characteristics of a reference treatment plan are used to assess and modify the Eclipse planning parameters and to guide the search for a clinically sensible treatment plan. The approach is applied to plan a head and neck (HN) VMAT case and a prostate IMRT case. Our study demonstrated the feasibility of application programming method in C# environment with recorded interactions of planner‐TPS. The process mimics a planner's planning process and automatically provides clinically sensible treatment plans that would otherwise require a large amount of manual trial and error of a planner. The proposed technique enables us to harness a commercial TPS by application programming via the use of recorded human computer interactions and provides an effective tool to greatly facilitate the treatment planning process. PACS number(s): 87.55.D‐, 87.55.kd, 87.55.de PMID:27929493
Edward B. Butler
2005-01-01
The fires of 2000 and 2002 catalyzed a national mandate for fuel treatment programs to facilitate wildfire mitigation, yet the issues that need to be considered when planning large landscape projects are daunting, often ending in gridlock due to planning conflicts. Hazardous fuels maps help little when planning for integrated, system-wide ecological objectives and fail...
PLANS: A finite element program for nonlinear analysis of structures. Volume 1: Theoretical manual
NASA Technical Reports Server (NTRS)
Pifko, A.; Levine, H. S.; Armen, H., Jr.
1975-01-01
The PLANS system is described which is a finite element program for nonlinear analysis. The system represents a collection of special purpose computer programs each associated with a distinct physical problem class. Modules of PLANS specifically referenced and described in detail include: (1) REVBY, for the plastic analysis of bodies of revolution; (2) OUT-OF-PLANE, for the plastic analysis of 3-D built-up structures where membrane effects are predominant; (3) BEND, for the plastic analysis of built-up structures where bending and membrane effects are significant; (4) HEX, for the 3-D elastic-plastic analysis of general solids; and (5) OUT-OF-PLANE-MG, for material and geometrically nonlinear analysis of built-up structures. The SATELLITE program for data debugging and plotting of input geometries is also described. The theoretical foundations upon which the analysis is based are presented. Discussed are the form of the governing equations, the methods of solution, plasticity theories available, a general system description and flow of the programs, and the elements available for use.
Space transportation systems within ESA programmes: Current status and perspectives
NASA Astrophysics Data System (ADS)
Delahais, Maurice
1993-03-01
An overview of the space transportation aspects of the ESA (European Space Agency) programs as they result from history, present status, and decisions taken at the ministerial level conference in Granada, Spain is presented. The new factors taken into consideration for the long term plan proposed in Munich, Germany, the three strategic options for the reorientation of the ESA long term plan, and the essential elements of space transportation in the Granada long term plan in three areas of space activities, scientific, and commercial launches with expendable launch vehicles, manned flight and in-orbit infrastructure, and future transportation systems are outlined. The new ESA long term plan, in the field of space transportation systems, constitutes a reorientation of the initial program contemplated in previous councils at ministerial level. It aims at balancing the new economic situation with the new avenues of cooperation, and the outcome will be a new implementation of the space transportation systems policy.
32 CFR 239.13 - Program Performance Reviews.
Code of Federal Regulations, 2010 CFR
2010-07-01
... will prepare monthly program performance reviews using the Homeowners Assistance Program Management Information System; HQUSACE Annual Management Command Plan and Management Control Checklist. In addition...
University Library Online Reference Service Program Plan, 1986/87.
ERIC Educational Resources Information Center
Koga, James S.
This program plan for online reference service--the individualized assistance provided to a library patron using an online system--at California State Polytechnic University, Pomona, covers the areas of funding, eligibility for online services, search request eligibility, database eligibility, management of online services, reference faculty…
What Schools Are Doing. A Roundup of New and Unusual School Practices
ERIC Educational Resources Information Center
Nation's Schools, 1972
1972-01-01
Describes a teen-run cafeteria, a program of giving away obsolete texts, a short term investment plan (a programed approach to cash-flow budgeting), an emergency credit'' plan whereby teachers can acquire credit hours outside school, and an automated attendance checker system. (DN)
Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)
NASA Technical Reports Server (NTRS)
2005-01-01
This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.
The Planning Wheel: Value Added Performance.
ERIC Educational Resources Information Center
Murk, Peter J.; Walls, Jeffrey L.
The "Planning Wheel" is an evolution of the original Systems Approach Model (SAM) that was introduced in 1986 by Murk and Galbraith. Unlike most current planning models, which are linear in design and concept, the Planning Wheel bridges the gap between linear and nonlinear processes. The "Program Planning Wheel" is designed to…
Space Station Program Description Document. Books 1-7
NASA Technical Reports Server (NTRS)
1984-01-01
The Space Station Program Description Document is summarized. The six volumes include: (1) introduction and summary; (2) mission description; (3) systems requirements and characteristics; (4) advanced development; (6) system operations; and (7) program plan. Volume 5 was deleted as a separate book.
Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Millard, W. David; Johnson, Daniel M.; Henderson, John M.
2014-07-28
Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less
The plan for the economic evaluation of the Public Service Communication Satellite system
NASA Technical Reports Server (NTRS)
1977-01-01
A total plan for the economic evaluation of the PSCS public service communication satellite program within domestic markets is presented. It extends from the present through the planning, performance and evaluation of economic experiments following the launch of the PSCS, and includes the consideration of how the results of these experiments impact the transfer from demonstration to operations. The implementation of this plan will provide NASA with information needed to understand and manage the economic and social impacts of the PSCS program.
Increasing productivity of the McAuto CAD/CAE system by user-specific applications programming
NASA Technical Reports Server (NTRS)
Plotrowski, S. M.; Vu, T. H.
1985-01-01
Significant improvements in the productivity of the McAuto Computer-Aided Design/Computer-Aided Engineering (CAD/CAE) system were achieved by applications programming using the system's own Graphics Interactive Programming language (GRIP) and the interface capabilities with the main computer on which the system resides. The GRIP programs for creating springs, bar charts, finite element model representations and aiding management planning are presented as examples.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROOT, R.W.
1999-05-18
This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; McNiven, Andrea
2013-05-01
Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreementmore » was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.« less
A Roadmap for using Agile Development in a Traditional System
NASA Technical Reports Server (NTRS)
Streiffert, Barbara; Starbird, Thomas
2006-01-01
I. Ensemble Development Group: a) Produces activity planning software for in spacecraft; b) Built on Eclipse Rich Client Platform (open source development and runtime software); c) Funded by multiple sources including the Mars Technology Program; d) Incorporated the use of Agile Development. II. Next Generation Uplink Planning System: a) Researches the Activity Planning and Sequencing Subsystem for Mars Science Laboratory (APSS); b) APSS includes Ensemble, Activity Modeling, Constraint Checking, Command Editing and Sequencing tools plus other uplink generation utilities; c) Funded by the Mars Technology Program; d) Integrates all of the tools for APSS.
NASA Technical Reports Server (NTRS)
1971-01-01
A preliminary plan and procedure are presented for conducting an extended manned test program for a regenerative life support system. Emphasis will be placed on elements associated with long-term system operation and long-term uninterrupted crew confinement.
Automated planning for intelligent machines in energy-related applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; de Saussure, G.; Barhen, J.
1984-01-01
This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.
Advanced Education and Technology Business Plan, 2010-13
ERIC Educational Resources Information Center
Alberta Advanced Education and Technology, 2010
2010-01-01
This paper presents the business plan of the Ministry of Advanced Education and Technology for 2010 to 2013. Advanced Education and Technology supports the advanced learning system by providing funding for advanced learning providers, coordinating and approving programs of study at public institutions, licensing and approving programs at private…
Financial Management for Transit: A Handbook.
ERIC Educational Resources Information Center
Heaselden, Mark; And Others
This handbook is primarily intended to serve as a primer for transit system managers who have not had any formal financial education through college classes, professional development programs, or extensive on-the-job programs. The following topics are covered: financial planning techniques for transit (beginning the financial planning process,…
ERIC Educational Resources Information Center
Nevada System of Higher Education, 2011
2011-01-01
This report is prepared in accordance to state law requiring the Nevada System of Higher Education (NSHE) to prepare a biennial report for submission to the Nevada State Legislature that outlines a plan for new programs and expansions of existing programs of instruction, public service and research. This report highlights the strategic objectives…
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...
ERIC Educational Resources Information Center
Nevada Univ. and Community Coll. System, Reno. Office of the Chancellor.
This report, submitted by the Board of Regents of the University and Community College System of Nevada (UCCSN), outlines anticipated programs and expansion of existing programs, anticipated costs and resources, and other information concerning the comprehensive planning of the UCCSN for the next 4 years. The first section of the report includes…
Residential solar-heating/cooling system
NASA Technical Reports Server (NTRS)
1980-01-01
Report documents progress of residential solar-heating and cooling system development program at 5-month mark of anticipated 17-month program. System design has been completed, and development and component testing has been initiated. Report includes diagrams, operation overview, optimization studies of subcomponents, and marketing plans for system.
Advanced rotorcraft technology: Task force report
NASA Technical Reports Server (NTRS)
1978-01-01
The technological needs and opportunities related to future civil and military rotorcraft were determined and a program plan for NASA research which was responsive to the needs and opportunities was prepared. In general, the program plan places the primary emphasis on design methodology where the development and verification of analytical methods is built upon a sound data base. The four advanced rotorcraft technology elements identified are aerodynamics and structures, flight control and avionic systems, propulsion, and vehicle configurations. Estimates of the total funding levels that would be required to support the proposed program plan are included.
Blazing the trailway: Nuclear electric propulsion and its technology program plans
NASA Technical Reports Server (NTRS)
Doherty, Michael P.
1992-01-01
An overview is given of the plans for a program in nuclear electric propulsion (NEP) technology for space applications being considered by NASA, DOE, and DOD. Possible missions using NEP are examined, and NEP technology plans are addressed regarding concept development, systems engineering, nuclear fuels, power conversion, thermal management, power management and distribution, electric thrusters, facilities, and issues related to safety and environment. The programmatic characteristics are considered.
Implications of Recovering for Mental Health Systems and Programs.
ERIC Educational Resources Information Center
Spaniol, LeRoy
This presentation outlines the implications of psychiatric disability recovery for mental health systems and programs. Schizophrenia and other serious psychiatric disabilities have been viewed as irreversible illnesses with increasing disability over time. Mental health program planning, policies, and practices have been developed and implemented…
Manufacturing Methods and Technology Program Plan, CY 1980.
1980-09-01
AD-A092 2Ii3 &RMY INDUSTRIAL BASE ENGINEERING ACTIVITY ROCK ISLAND IL FIG 1346 ..ANIJPACTRItd METH4OS AND TECNOLOGY PROGRAM PLAN. CY 1960. (U) %EP 60... innovative solutions. For example, material handling, process tools and inspection systems must be computerized to achieve the desired operating economics and...to decrease expensive direct labor; however, the new systems must also be capable of economic layaway for periods of ten years or more, a situation
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Informap... a computerized information system for fire planning and fire control
Theodore G. Storey; Ross D. Carder; Ernest T. Tolin
1969-01-01
INFORMAP (Information Necessary for Optimum Resource Management and Protection) is a computerized system under development for storing, manipulating, retrieving, and displaying data for fire planning and fire control. A prototype for planning applications has been developed and tested. It is programed in Fortran IV for the IBM 7040 computer, and displays information in...
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
Systemic Planning: An Annotated Bibliography and Literature Guide. Exchange Bibliography No. 91.
ERIC Educational Resources Information Center
Catanese, Anthony James
Systemic planning is an operational approach to using scientific rigor and qualitative judgment in a complementary manner. It integrates rigorous techniques and methods from systems analysis, cybernetics, decision theory, and work programing. The annotated reference sources in this bibliography include those works that have been most influential…
South Dakota ITS/CVO business plan : final business plan
DOT National Transportation Integrated Search
1998-01-18
This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...
NASA Technical Reports Server (NTRS)
1975-01-01
The organization, objectives, and accomplishments of the panel on Land Use Planning are reported. Technology developments, and projected developments are discussed along with anticipated information requirements. The issues for users, recommended remote sensing programs, and space systems are presented. It was found that remote sensing systems are useful in future land use planning. It is recommended that a change detection system for monitoring land use and critical environmental areas be developed by 1979.
NASA Technical Reports Server (NTRS)
Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.
1989-01-01
The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.
ITS National Intelligent Transportation Systems Program Plan: Five Year Horizon Plan
DOT National Transportation Integrated Search
2000-08-01
Transportation is vital to the social and economic health of the nation. Surface transportation systems - the net-works of highways, local streets, bus routes, and rail lines - are the ties that bind communities and facilitate commerce, connecting re...
Minnesota urban partnership agreement national evaluation : traffic system data test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the traffic system data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employi...
Minnesota urban partnership agreement national evaluation : transit system data test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the test plan for collecting and analyzing transit system data for the Minnesota Urban Partnership Agreement (UPA) National Evaluation under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA...
DOT National Transportation Integrated Search
1993-01-01
The Virginia Department of Transportation (VDOT) is committed to Virginia PROGRESS, which is a program for Intelligent Vehicle-Highway System (IVHS) research, development, and deployment. This document, VDOT's IVHS Strategic Plan, will guide the Depa...
DOT National Transportation Integrated Search
2015-12-01
The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...
DOT National Transportation Integrated Search
1997-08-01
This system architecture paper will discuss proposed architectures for the four infrastructure oriented program areas defined by the project team and presented in the Strategic Deployment Plan (August 1997). This report will concentrate on defi...
Results from a national survey on chronic care management by health plans.
Mattke, Soeren; Higgins, Aparna; Brook, Robert
2015-05-01
The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.
Network speech systems technology program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1981-09-01
This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
NASA Technical Reports Server (NTRS)
1978-01-01
An overview of the program to evaluate the solar satellite power system concept is presented. Environmental, health, and safety factors are examined along with economic, international, and institutional issues.
Decision support systems for transportation system management and operations (TSM&O) : [summary].
DOT National Transportation Integrated Search
2016-01-01
The Transportation System Management and Operations (TSM&O) program of the Florida : Department of Transportation (FDOT) has seven objectives, which are listed in the TSM&O : Tier 2 business plan. Two important objectives of the program are to con...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; Hamel, W.R.; Barhen, J.
1986-02-01
The Oak Ridge National Laboratory has established the Center for Engineering Systems Advanced Research (CESAR) for the purpose of addressing fundamental problems of intelligent machine technologies. The purpose of this document is to establish a framework and guidelines for research and development within ORNL's CESAR program in areas pertaining to intelligent machines. The specific objective is to present a CESAR Research and Development Plan for such work with a planning horizon of five to ten years, i.e., FY 1985 to FY 1990 and beyond. As much as possible, the plan is based on anticipated DOE needs in the area ofmore » productivity increase and safety to the end of this century.« less
Orbital Express Mission Operations Planning and Resource Management using ASPEN
NASA Technical Reports Server (NTRS)
Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny
2008-01-01
The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
NASA Technical Reports Server (NTRS)
1980-01-01
Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.
NASA's Next Generation Launch Technology Program - Strategy and Plans
NASA Technical Reports Server (NTRS)
Hueter, Uwe
2003-01-01
The National Aeronautics and Space Administration established a new program office, Next Generation Launch Technology (NGLT) Program Office, last year to pursue technologies for future space launch systems. NGLT will fund research in key technology areas such as propulsion, launch vehicles, operations and system analyses. NGLT is part of NASA s Integrated Space Technology Plan. The NGLT Program is sponsored by NASA s Office of Aerospace Technology and is part of the Space Launch Initiative theme that includes both NGLT and Orbital Space Plane. NGLT will focus on technology development to increase safety and reliability and reduce overall costs associated with building, flying and maintaining the nation s next-generations of space launch vehicles. These investments will be guided by systems engineering and analysis with a focus on the needs of National customers.
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
Integrating planning and reactive control
NASA Technical Reports Server (NTRS)
Rosenschein, Stanley J.; Kaelbling, Leslie Pack
1989-01-01
Artificial intelligence research on planning is concerned with designing control systems that choose actions by manipulating explicit descriptions of the world state, the goal to be achieved, and the effects of elementary operations available to the system. Because planning shifts much of the burden of reasoning to the machine, it holds great appeal as a high-level programming method. Experience shows, however, that it cannot be used indiscriminately because even moderately rich languages for describing goals, states, and the elementary operators lead to computational inefficiencies that render the approach unsuitable for realistic applications. This inadequacy has spawned a recent wave of research on reactive control or situated activity in which control systems are modeled as reacting directly to the current situation rather than as reasoning about the future effects of alternative action sequences. While this research has confronted the issue of run-time tractability head on, in many cases it has done so by sacrificing the advantages of declarative planning techniques. Ways in which the two approaches can be unified are discussed. The authors begin by modeling reactive control systems as state machines that map a stream of sensory inputs to a stream of control outputs. These machines can be decomposed into two continuously active subsystems: the planner and the execution module. The planner computes a plan, which can be seen as a set of bits that control the behavior of the execution module. An important element of this work is the formulation of a precise semantic interpretation for the inputs and outputs of the planning system. They show that the distinction between planned and reactive behavior is largely in the eye of the beholder: systems that seem to compute explicit plans can be redescribed in situation-action terms and vice versa. They also discuss practical programming techniques that allow the advantages of declarative programming and guaranteed reactive response to be achieved simultaneously.
Transportation technology program: Strategic plan
NASA Astrophysics Data System (ADS)
1991-09-01
The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.
Transportation technology program: Strategic plan
NASA Technical Reports Server (NTRS)
1991-01-01
The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.
NASA Astrophysics Data System (ADS)
Cook, Stephen; Hueter, Uwe
2003-08-01
NASA's Integrated Space Transportation Plan (ISTP) calls for investments in Space Shuttle safety upgrades, second generation Reusable Launch Vehicle (RLV) advanced development and third generation RLV and in-space research and technology. NASA's third generation launch systems are to be fully reusable and operation by 2025. The goals for third generation launch systems are to reduce cost by a factor of 100 and improve safety by a factor of 10,000 over current systems. The Advanced Space Transportation Program Office (ASTP) at NASA's Marshall Space Flight Center in Huntsville, AL has the agency lead to develop third generation space transportation technologies. The Hypersonics Investment Area, part of ASTP, is developing the third generation launch vehicle technologies in two main areas, propulsion and airframes. The program's major investment is in hypersonic airbreathing propulsion since it offers the greatest potential for meeting the third generation launch vehicles. The program will mature the technologies in three key propulsion areas, scramjets, rocket-based combined cycle and turbine-based combination cycle. Ground and flight propulsion tests are being planned for the propulsion technologies. Airframe technologies will be matured primarily through ground testing. This paper describes NASA's activities in hypersonics. Current programs, accomplishments, future plans and technologies that are being pursued by the Hypersonics Investment Area under the Advanced Space Transportation Program Office will be discussed.
An implementation plan for priorities in solar-system space physics
NASA Technical Reports Server (NTRS)
Krimigis, Stamatios M.; Athay, R. Grant; Baker, Daniel; Fisk, Lennard A.; Fredricks, Robert W.; Harvey, John W.; Jokipii, Jack R.; Kivelson, Margaret; Mendillo, Michael; Nagy, Andrew F.
1985-01-01
The scientific objectives and implementation plans and priorities of the Space Science Board in areas of solar physics, heliospheric physics, magnetospheric physics, upper atmosphere physics, solar-terrestrial coupling, and comparative planetary studies are discussed and recommended programs are summarized. Accomplishments of Skylab, Solar Maximum Mission, Nimbus-7, and 11 other programs are highlighted. Detailed mission plans in areas of solar and heliospheric physics, plasma physics, and upper atmospheric physics are also described.
High resolution microwave spectrometer sounder (HIMSS), volume 1, book 2
NASA Technical Reports Server (NTRS)
1990-01-01
The following topics are presented with respect to the high resolution microwave spectrometer sounder (HIMSS) that is to be used as an instrument for NASA's Earth Observing System (EOS): (1) preliminary program plans; (2) contract end item (CEI) specification; and (3) the instrument interface description document. Under the preliminary program plans section, plans dealing with the following subject areas are discussed: spares, performance assurance, configuration management, software implementation, contamination, calibration management, and verification.
2007-05-01
partners will be encouraged to use the assessment methodologies referenced above, or ISO 27001 and ISO 17799, which are intended to be used together...the Information Systems Audit and Control Association (ISACA), the International Organization for Standardization ( ISO ), and a number of other...programs are aligned with NCSD’s goals for the IT sector and follow best practices developed by NIST and the ISO . The cyber protective programs
2012-2016 Iowa Transportation Improvement Program.
DOT National Transportation Integrated Search
2011-06-01
"The Iowa Transportation Improvement Program (Program) is published to inform : Iowans of planned investments in our states transportation system. : The Iowa Transportation Commission (Commission) and Iowa Department of : Transportation (Iowa DOT)...
49 CFR 659.27 - Internal safety and security reviews.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the..., indicating that the rail transit agency is in compliance with its system safety program plan and system... security reviews indicate that the rail transit agency is not in compliance with its system safety program...
Peer Programs: An In-Depth Look at Peer Helping: Planning, Implementation, and Administration.
ERIC Educational Resources Information Center
Tindall, Judith A.
The goal of this book is to provide a program designed to teach peer helping professionals a method and rationale for training peer helpers. Peer helping programs are a major delivery system of affective education or deliberate psychological education. Peer helping programs can provide prevention, intervention, and support systems for people.…
ERIC Educational Resources Information Center
King, Richard G., Jr.
Designed to provide background for the planning of collection preservation programs in the libraries of the University of California, this paper presents an overview of the preservation problem, makes specific recommendations for further programs within the University of California library system, and assesses the needs of the system with regard…
San Francisco urban partnership agreement, national evaluation : traffic system data test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing traffic system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects fo...
An online planning tool for designing terrace layouts
USDA-ARS?s Scientific Manuscript database
A web-based conservation planning tool, WebTERLOC (web-based Terrace Location Program), was developed to provide multiple terrace layout options using digital elevation model (DEM) and geographic information systems (GIS). Development of a terrace system is complicated by the time-intensive manual ...
San Francisco urban partnership agreement, national evaluation : transit system data test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing the transit system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA project...
Urban Planning and Management Information Systems Analysis and Design Based on GIS
NASA Astrophysics Data System (ADS)
Xin, Wang
Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.
40 CFR 96.252 - Responsibilities of CAIR authorized account representative.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Allowance Tracking System § 96.252 Responsibilities of CAIR authorized account representative. Following the establishment of a CAIR SO2 Allowance Tracking System...
Spectrum/Orbit-Utilization Program
NASA Technical Reports Server (NTRS)
Miller, Edward F.; Sawitz, Paul; Zusman, Fred
1988-01-01
Interferences among geostationary satellites determine allocations. Spectrum/Orbit Utilization Program (SOUP) is analytical computer program for determining mutual interferences among geostationary-satellite communication systems operating in given scenario. Major computed outputs are carrier-to-interference ratios at receivers at specified stations on Earth. Information enables determination of acceptability of planned communication systems. Written in FORTRAN.
ERIC Educational Resources Information Center
Moallem, Mahnaz; Applefield, James
This study explored the development and processes of thinking, planning, and decision making of two preservice teachers as they progressed through their teacher education program. The effects of training in the systems approach on two preservice teachers' thinking about instruction and on their actual instructional planning documents were…
Strategic Planning: Shaping Future Success
2016-09-01
fielding, the PM may also be planning for future increments , sustainment and other long-term ef- forts. Strategic planning can help the PM position these...introduced the Planning, Programming, and Budgeting System (PPBS) to the DoD. Prior to that, the DoD’s budget - ing focused on areas such as overhead
32 CFR 813.6 - Planning and requesting combat documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Joint Operation Planning and Execution System, that in turn, requests support from HQ AMC. HQ USAF can... 32 National Defense 6 2010-07-01 2010-07-01 false Planning and requesting combat documentation... SALES AND SERVICES VISUAL INFORMATION DOCUMENTATION PROGRAM § 813.6 Planning and requesting combat...
Quality assurance of HDR prostate plans: program implementation at a community hospital.
Rush, Jennifer B; Thomas, Michael D
2005-01-01
Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.
48 CFR 212.7102 - Pilot program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program. 212.7102... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Acquisition of Military-Purpose Nondevelopmental Items 212.7102 Pilot program. ...
NASA Technical Reports Server (NTRS)
1984-01-01
The structure of the program, the five priority levels, the drive routines, the stepwise drive plan, the figure routines, meander X and y, the range of measurement table, the optimization of figure drive, the figure drive plan, dialogue routines, stack processing, the drive for the main terminal, the protocol routines, the drive for the microterminal, the drive for the experiment computer, and the main program are discussed.
Theising, Katie M; Fritschle, Traci L; Scholfield, Angelina M; Hicks, Emily L; Schymik, Michelle L
2015-11-01
Our objective was to describe the implementation and clinical outcomes of an employer-sponsored, pharmacist-provided medication therapy management (MTM) program for health plan beneficiaries with diabetes mellitus and/or hypertension. We conducted a single-center retrospective medical record review. The setting was a Pharmacy MTM Clinic at a self-insured health system consisting of six hospitals and several ancillary facilities. A total of 161 health plan beneficiaries with diabetes identified during annual wellness screenings for the health plan in 2012 and 225 health plan beneficiaries with diabetes and/or hypertension identified during annual wellness screenings for the health plan in 2013 were referred to the MTM clinic based on specific criteria. In 2012 the health system expanded its existing wellness program by implementing a voluntary diabetes care program for health plan beneficiaries with uncontrolled diabetes (hemoglobin A(1c) [A1C] 7% or higher); a similar program was added for hypertension for the 2013 plan year. All participants' A1C and blood pressure results were tracked from the date of their wellness screening through the end of the plan year. The pharmacists involved had the capability to directly implement drug regimen changes according to hospital protocol or provide recommendations to the physician, as specified by the referring physician. For the 2012-2013 plan year, the mean difference in A1C from baseline to program completion was -0.38% (95% confidence interval [CI] -0.58 to -0.18%, p<0.05). For beneficiaries with a baseline A1C of 7% or higher, the mean difference was -0.69% (95% CI -0.99 to -0.39%, p<0.05). For the 2013-2014 plan year, the mean difference in A1C from baseline to program completion was -0.62% (95% CI -0.81 to -0.44%, p<0.05). In that year, the mean difference in A1C for beneficiaries with A1C 7% or higher was -0.97% (95% CI -1.23 to -0.72%, p<0.05). For those referred for hypertension, a mean difference of -13 mm Hg (95% CI -18.59 to -7.73, p<0.05) from baseline to program completion was seen in systolic blood pressure, and the mean difference in diastolic blood pressure was -7 mm Hg (95% CI -9.92 to -4.04, p<0.05). This study demonstrated that health plan beneficiaries who participated in the employer-sponsored, pharmacist-provided MTM program had significant decreases in A1C and blood pressure. © 2015 Pharmacotherapy Publications, Inc.
Time-based air traffic management using expert systems
NASA Technical Reports Server (NTRS)
Tobias, L.; Scoggins, J. L.
1986-01-01
A prototype expert system has been developed for the time scheduling of aircraft into the terminal area. The three functions of the air-traffic-control schedule advisor are as follows: (1) for each new arrival, it develops an admisible flight plan for that aircraft; (2) as the aircraft progresses through the terminal area, it monitors deviations from the aircraft's flight plan and provides advisories to return the aircraft to its assigned schedule; and (3) if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programmed in MRS (a logic programming language), Lisp, and Fortran.
Time-based air traffic management using expert systems
NASA Technical Reports Server (NTRS)
Tobias, L.; Scoggins, J. L.
1986-01-01
A prototype expert system was developed for the time scheduling of aircraft into the terminal area. The three functions of the air traffic control schedule advisor are as follows: first, for each new arrival, it develops an admissible flight plan for that aircraft. Second, as the aircraft progresses through the terminal area, it monitors deviations from the flight plan and provides advisories to return the aircraft to its assigned schedule. Third, if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programed in MRS (a logic programming language), Lisp, and FORTRAN.
Planning for intelligent transportation systems in small urban areas.
DOT National Transportation Integrated Search
1997-01-01
Intelligent transportation systems (ITS) has been a primary program focus of the U.S. Department of Transportation since its origination in the Intermodal Surface Transportation Efficiency Act of 1991. The federal ITS program funded early deployment ...
Programs Related to Septic Systems
There are many programs, both at the EPA and elsewhere, that relate to the decentralized wastewater program and provide information about how decentralized wastewater is integrated in environmental quality, planning, protection, and conservation.
2013-2017 Iowa Transportation Improvement Program.
DOT National Transportation Integrated Search
2012-06-01
The Iowa Transportation Improvement Program (Program) is published to inform you : of planned investments in our states transportation system. The Iowa Transportation : Commission (Commission) and Iowa Department of Transportation (DOT) are commit...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Y; Tan, J; Jiang, S
Purpose: Plan specific quality assurance (QA) is an important step in high dose rate (HDR) brachytherapy to ensure the integrity of a treatment plan. The conventional approach is to assemble a set of plan screen-captures in a document and have an independent plan-checker to verify it. Not only is this approach cumbersome and time-consuming, using a document also limits the items that can be verified, hindering plan quality and patient safety. We have initiated efforts to develop a web-based HDR brachytherapy QA system called AutoBrachy QA, for comprehensive and efficient QA. This abstract reports a new plugin in this systemmore » for the QA of a cylinder HDR brachytherapy treatment. Methods: A cylinder plan QA module was developed using Python. It was plugged into our AutoBrachy QA system. This module extracted information from CT images and treatment plan. Image processing techniques were employed to obtain geometric parameters, e.g. cylinder diameter. A comprehensive set of eight geometrical and eight dosimetric features of the plan were validated against user specified planning parameter, such as prescription value, treatment depth and length, etc. A PDF document was generated, consisting of a summary QA sheet with all the QA results, as well as images showing plan details. Results: The cylinder QA program has been implemented in our clinic. To date, it has been used in 11 patient cases and was able to successfully perform QA tests in all of them. The QA program reduced the average plan QA time from 7 min using conventional manual approach to 0.5 min. Conclusion: Being a new module in our AutoBrachy QA system, an automated treatment plan QA module for cylinder HDR brachytherapy has been successfully developed and clinically implemented. This module improved clinical workflow and plan integrity compared to the conventional manual approach.« less
FOCUS: a fire management planning system -- final report
Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey
1981-01-01
FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...
40 CFR 141.804 - Aircraft water system operations and maintenance plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Aircraft water system operations and maintenance plan. 141.804 Section 141.804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.804 Aircraft water system...
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
Final Design for a Comprehensive Orbital Debris Management Program
NASA Technical Reports Server (NTRS)
1990-01-01
The rationale and specifics for the design of a comprehensive program for the control of orbital debris, as well as details of the various components of the overall plan, are described. The problem of orbital debris has been steadily worsening since the first successful launch in 1957. The hazards posed by orbital debris suggest the need for a progressive plan for the prevention of future debris, as well as the reduction of the current debris level. The proposed debris management plan includes debris removal systems and preventative techniques and policies. The debris removal is directed at improving the current debris environment. Because of the variance in sizes of debris, a single system cannot reasonably remove all kinds of debris. An active removal system, which deliberately retrieves targeted debris from known orbits, was determined to be effective in the disposal of debris tracked directly from earth. However, no effective system is currently available to remove the untrackable debris. The debris program is intended to protect the orbital environment from future abuses. This portion of the plan involves various environment from future abuses. This portion of the plan involves various methods and rules for future prevention of debris. The preventative techniques are protective methods that can be used in future design of payloads. The prevention policies are rules which should be employed to force the prevention of orbital debris.
DOT National Transportation Integrated Search
2007-01-01
Surface transportation planning in the United States has become a complex system of intergovernmental planning : and environmental compliance requirements over the past several decades. As a result, the process from planning : stage to project implem...
SOFIA Program SE and I Lessons Learned
NASA Technical Reports Server (NTRS)
Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.
2011-01-01
Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.
Fuzzy robust credibility-constrained programming for environmental management and planning.
Zhang, Yimei; Hang, Guohe
2010-06-01
In this study, a fuzzy robust credibility-constrained programming (FRCCP) is developed and applied to the planning for waste management systems. It incorporates the concepts of credibility-based chance-constrained programming and robust programming within an optimization framework. The developed method can reflect uncertainties presented as possibility-density by fuzzy-membership functions. Fuzzy credibility constraints are transformed to the crisp equivalents with different credibility levels, and ordinary fuzzy inclusion constraints are determined by their robust deterministic constraints by setting a-cut levels. The FRCCP method can provide different system costs under different credibility levels (lambda). From the results of sensitivity analyses, the operation cost of the landfill is a critical parameter. For the management, any factors that would induce cost fluctuation during landfilling operation would deserve serious observation and analysis. By FRCCP, useful solutions can be obtained to provide decision-making support for long-term planning of solid waste management systems. It could be further enhanced through incorporating methods of inexact analysis into its framework. It can also be applied to other environmental management problems.
Systems Engineering in NASA's R&TD Programs
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.
NASA Astrophysics Data System (ADS)
Tošić, Saša; Mitrović, Dejan; Ivanović, Mirjana
2013-10-01
Agent-oriented programming languages are designed to simplify the development of software agents, especially those that exhibit complex, intelligent behavior. This paper presents recent improvements of AgScala, an agent-oriented programming language based on Scala. AgScala includes declarative constructs for managing beliefs, actions and goals of intelligent agents. Combined with object-oriented and functional programming paradigms offered by Scala, it aims to be an efficient framework for developing both purely reactive, and more complex, deliberate agents. Instead of the Prolog back-end used initially, the new version of AgScala relies on Agent Planning Package, a more advanced system for automated planning and reasoning.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
2013-2017 highway program summary.
DOT National Transportation Integrated Search
2012-06-01
The Iowa Transportation Commission (Commission) and the Iowa Department of : Transportation (DOT) develop Iowas Five Year Highway Program (Program) to : inform you of planned investments in our states primary and interstate highway : system. Th...
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
ERIC Educational Resources Information Center
Lasfer, Kahina
2012-01-01
The Systems Engineering Program at Stevens Institute of Technology has developed the Open Academic Model (OAM) to guide its strategic planning and operations since its founding in 2001. Guided by OAM, the Stevens Systems Engineering Program (SSEP) has grown from inception in 2001 into one of the largest in the US. The main objectives of the…
Software for Planning Scientific Activities on Mars
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitchell; Bresina, John; Jonsson, Ari; Hsu, Jennifer; Kanefsky, Bob; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey; Charest, Len; Maldague, Pierre
2003-01-01
Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.
NASA Technical Reports Server (NTRS)
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
Louisiana CVO/ITS business plan
DOT National Transportation Integrated Search
1998-06-01
Louisianas CVO / ITS Business Plan provides a long-term strategic vision and implementation program for meeting Louisianas Commercial Vehicle Operations / Intelligent Transportation Systems (CVO / ITS) needs. Commercial Vehicle Operations - CVO...
NASA Technical Reports Server (NTRS)
Kopardekar, Parimal H.
2010-01-01
This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders
National space transportation systems planning
NASA Technical Reports Server (NTRS)
Lucas, W. R.
1985-01-01
In the fall of 1984, the DOD and NASA had been asked to identify launch vehicle technologies which could be made available for use in 1995 to 2010. The results of the studies of the two groups were integrated, and a consumer report, dated December 1984, was forwarded to the President. Aspects of mission planning and analysis are discussed along with a combined mission model, future launch system requirements, a launch vehicle planning background, Shuttle derivative vehicle program options, payload modularization, launch vehicle technology implications, a new engine program for the mid-1990's. Future launch systems goals are to achieve an order of magnitude reduction in future launch cost and meet the lift requirements and launch rates. Attention is given to an advanced cryogenic engine, advanced LOX/hydrocarbon engine, advanced power systems, aerodynamics/flight mechanics, reentry/recovery systems, avionics/software, advanced manufacturing techniques, autonomous ground and mission operations, advanced structures/materials, and air breathing propulsion.
1982-09-01
Offshore Industry U.S. DEPARTMENT OF THE NAVY CARDEROCK DIVISION, NAVAL SURFACE WARFARE CENTER Report Documentation Page Form ApprovedOMB No . 0704...INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION AND TRAINING THE NATIONAL SHIPBUILDING RESEARCH PROGRAM September 1982 NSRP 0009...Proceedings of the IREAPS Technical Symposium Paper No . 24: MAPLIS: An On-Line Materials Resource Planning System Tailored to the Shipbuilding and
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1981-01-01
Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Becker, G.K.
1997-01-01
Bio-Imaging Research Inc. (BIR) and Lockheed Martin Speciality Components (LMSC) are engaged in a Program Research and Development Agreement and a Rapid Commercialization Initiative with the Department of Energy, EM-50. The agreement required BIR and LMSC to develop a data interpretation method that merges nondestructive assay and nondestructive examination (NDA/NDE) data and information sufficient to establish compliance with applicable National TRU Program (Program) waste characterization requirements and associated quality assurance performance criteria. This effort required an objective demonstration of the BIR and LMSC waste characterization systems in their standalone and integrated configurations. The goal of the test plan is tomore » provide a mechanism from which evidence can be derived to substantiate nondestructive assay capability and utility statement for the BIT and LMSC systems. The plan must provide for the acquisition, compilation, and reporting of performance data thereby allowing external independent agencies a basis for an objective evaluation of the standalone BIR and LMSC measurement systems, WIT and APNEA respectively, as well as an expected performance resulting from appropriate integration of the two systems. The evaluation is to be structured such that a statement regarding select INEL RWMC waste forms can be made in terms of compliance with applicable Program requirements and criteria.« less
A Recording System for Your Program.
ERIC Educational Resources Information Center
Abdoo, Frank B.
1981-01-01
The author explains terminology and recommends components for a semiprofessional recording facility suitable to a school or small college music program with a limited budget. The recommended system costs approximately $13,000. Equipment prices and purchasing plans are discussed. (SJL)
76 FR 60934 - U.S. Global Change Research Program Strategic Plan Public Comment Period
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... components of the Earth system. Goal 2: Inform Decisions: Provide the scientific basis to inform and enable... comment period. SUMMARY: This Notice advises the public that the public comment period for the U.S. Global Change Research Program (USGCRP) Strategic Plan is now open. Every ten years, in accordance with the...
Patient Activities Planning and Progress Noting a Humanistic Integrated-Team Approach.
ERIC Educational Resources Information Center
Muilenburg, Ted
This document outlines a system for planning recreation therapy, documenting progress, and relating the entire process to a team approach which includes patient assessment and involvement. The recreation program is seen as therapeutic, closely related to the total medical treatment program. The model is designed so that it can be adapted to almost…
Minnesota Guidestar : Board of Directors' statewide ITS strategic plan 2000
DOT National Transportation Integrated Search
2000-03-01
ITS Strategic Plan 2000 is Minnesota Guidestar Board of Directors' guide for implementation of an integrated statewide program for Intelligent Transportation Systems. The plan is intended to be used by the Board of Directors, as well as by the broad ...
Data systems and computer science: Software Engineering Program
NASA Technical Reports Server (NTRS)
Zygielbaum, Arthur I.
1991-01-01
An external review of the Integrated Technology Plan for the Civil Space Program is presented. This review is specifically concerned with the Software Engineering Program. The goals of the Software Engineering Program are as follows: (1) improve NASA's ability to manage development, operation, and maintenance of complex software systems; (2) decrease NASA's cost and risk in engineering complex software systems; and (3) provide technology to assure safety and reliability of software in mission critical applications.
Verification and Planning Based on Coinductive Logic Programming
NASA Technical Reports Server (NTRS)
Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal
2008-01-01
Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution as well as preliminary implementations of the planning and verification applications have been developed [4]. Co-LP and Model Checking: The vast majority of properties that are to be verified can be classified into safety properties and liveness properties. It is well known within model checking that safety properties can be verified by reachability analysis, i.e, if a counter-example to the property exists, it can be finitely determined by enumerating all the reachable states of the Kripke structure.
Nie, Xianghui; Huang, Guo H; Li, Yongping
2009-11-01
This study integrates the concepts of interval numbers and fuzzy sets into optimization analysis by dynamic programming as a means of accounting for system uncertainty. The developed interval fuzzy robust dynamic programming (IFRDP) model improves upon previous interval dynamic programming methods. It allows highly uncertain information to be effectively communicated into the optimization process through introducing the concept of fuzzy boundary interval and providing an interval-parameter fuzzy robust programming method for an embedded linear programming problem. Consequently, robustness of the optimization process and solution can be enhanced. The modeling approach is applied to a hypothetical problem for the planning of waste-flow allocation and treatment/disposal facility expansion within a municipal solid waste (MSW) management system. Interval solutions for capacity expansion of waste management facilities and relevant waste-flow allocation are generated and interpreted to provide useful decision alternatives. The results indicate that robust and useful solutions can be obtained, and the proposed IFRDP approach is applicable to practical problems that are associated with highly complex and uncertain information.
NASA Technical Reports Server (NTRS)
Kumar, L.
1978-01-01
A computer program is described for calculating the flexibility coefficients as arm design changes are made for the remote manipulator system. The coefficients obtained are required as input for a second program which reduces the number of payload deployment and retrieval system simulation runs required to simulate the various remote manipulator system maneuvers. The second program calculates end effector flexibility and joint flexibility terms for the torque model of each joint for any arbitrary configurations. The listing of both programs is included in the appendix.
Toward PPBS: Program Budgeting in a Small School District.
ERIC Educational Resources Information Center
Durstine, Richard M.; Howell, Robert A.
This publication reports the results of the design and development of a planning programming budgeting system for the Milford, New Hampshire, school system. The authors attempted to develop a program oriented budget rather than a line item or input oriented budget, and a model adaptable for general applications. The order of priority budgeting…
Modeling sustainability in renewable energy supply chain systems
NASA Astrophysics Data System (ADS)
Xie, Fei
This dissertation aims at modeling sustainability of renewable fuel supply chain systems against emerging challenges. In particular, the dissertation focuses on the biofuel supply chain system design, and manages to develop advanced modeling framework and corresponding solution methods in tackling challenges in sustaining biofuel supply chain systems. These challenges include: (1) to integrate "environmental thinking" into the long-term biofuel supply chain planning; (2) to adopt multimodal transportation to mitigate seasonality in biofuel supply chain operations; (3) to provide strategies in hedging against uncertainty from conversion technology; and (4) to develop methodologies in long-term sequential planning of the biofuel supply chain under uncertainties. All models are mixed integer programs, which also involves multi-objective programming method and two-stage/multistage stochastic programming methods. In particular for the long-term sequential planning under uncertainties, to reduce the computational challenges due to the exponential expansion of the scenario tree, I also developed efficient ND-Max method which is more efficient than CPLEX and Nested Decomposition method. Through result analysis of four independent studies, it is found that the proposed modeling frameworks can effectively improve the economic performance, enhance environmental benefits and reduce risks due to systems uncertainties for the biofuel supply chain systems.
Planning for the Introduction of the Metric System into Occupational Education Programs
ERIC Educational Resources Information Center
Low, A. W.
1974-01-01
A three-dimensional planning model for introducting the International System of Metric Units into Canadian occupational education curricula includes employment level, career area, and metric topics. A fourth dimension, time, is considered in four separate phases: familiarization, adoption, conversion, and compulsory usage.
7 CFR 4280.119 - Construction planning and performing development.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...
7 CFR 4280.119 - Construction planning and performing development.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...
7 CFR 4280.119 - Construction planning and performing development.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...
Kodak AMSD Mirror Development Program
NASA Technical Reports Server (NTRS)
Matthews, Gary; Dahl, Roger; Barrett, David; Bottom, John; Russell, Kevin (Technical Monitor)
2002-01-01
The Advanced Mirror System Demonstration Program is developing minor technology for the next generation optical systems. Many of these systems will require extremely lightweight and stable optics due to the overall size of the primary mirror. These segmented, deployable systems require new technology that AMSD is developing. The on-going AMSD program is a critical enabler for Next Generation Space Telescope (NGST) which will start in 2002. The status of Kodak's AMSD mirror and future plans will be discussed with respect to the NGST program.
[Thinking about several problems of the research of our family planning strategy].
Shi, H
1989-03-01
On the basis of 1982 census data, it is estimated that from 1987-1997 13 million women will enter the age of marriage and child-bearing each year. The tasks of keeping the population size around 1.2 billion by the year 2000 is arduous. Great efforts have to be made to continue encouraging one child/couple, and to pursue the current plans and policies and maintain strict control over fertility. Keeping population growth in pace with economic growth, environment, ecological balance, availability of per capita resources, education programs, employment capability, health services, maternal and child care, social welfare and social security should be a component of the long term development strategy of the country. Family planning is a comprehensive program which involves long cycles and complicated factors, viewpoints of expediency in guiding policy and program formulation for short term benefits are inappropriate. The emphasis of family planning program strategy should be placed on the rural areas where the majority of population reside. Specifically, the major aspects of strategic thrusts should be the linkage between policy implementation and reception, between family planning publicity and changes of ideation on fertility; the integrated urban and rural program management relating to migration and differentiation of policy towards minority population and areas in different economic development stages. In order to achieve the above strategies, several measures are proposed. (1) strengthening family planning program and organization structure; (2) providing information on population and contraception; (3) establishing family planning program network for infiltration effects; (4) using government financing, taxation, loan, social welfare and penalty to regulate fertility motivations; (5) improving the system of target allocation and data reporting to facilitate program implementation; (6) strengthening population projection and policy research; (7) and strengthening training of family planning personnel to improve program efficiency.
NASA Astrophysics Data System (ADS)
1990-10-01
The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.
Analysis of the performance of the drive system and diffuser of the Langley unitary plan wind tunnel
NASA Technical Reports Server (NTRS)
Hasel, L. E.; Stallings, R. L.
1981-01-01
A broad program was initiated at the Langley Research Center in 1973 to reduce the energy consumption of the laboratory. As a part of this program, the performance characteristics of the Unitary Plan Wind Tunnel were reexamined to determine if potential methods for incresing the operating efficiencies of the tunnel could be formulated. The results of that study are summarized. The performance characteristics of the drive system components and the variable-geometry diffuser system of the tunnel are documented and analyzed. Several potential methods for reducing the energy requirements of the facility are discussed.
Planning and programing in the soil conservation service
NASA Technical Reports Server (NTRS)
Gray, R. M.
1972-01-01
The historical base is presented for the framework plan for soil conservation. Conservation effects, resource management systems, and accomplishments, activities, and costs of the Soil Conservation Service are discussed.
State Assessment (Accountability): Potential for Becoming a Friend or Foe?
ERIC Educational Resources Information Center
Buchmiller, Archie A.
A summary of legislation concerning educational accountability reveals that 13 States hope to find greater accountability in testing or assessment programs, 7 in planning, programming, budgeting systems, 4 in uniform accounting system, 8 in the evaluation of professional employees, 2 in management information systems, and 1 in performance…
An Intelligent Tutor for Intrusion Detection on Computer Systems.
ERIC Educational Resources Information Center
Rowe, Neil C.; Schiavo, Sandra
1998-01-01
Describes an intelligent tutor incorporating a program using artificial-intelligence planning methods to generate realistic audit files reporting actions of simulated users and intruders of a UNIX system, and a program simulating the system afterwards that asks students to inspect the audit and fix problems. Experiments show that students using…
Utilization of Information Provided by the Wisconsin Management System.
ERIC Educational Resources Information Center
Rossmiller, Richard A.
The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…
NASA Technical Reports Server (NTRS)
Hamilton, M. H.
1972-01-01
Erasable-memory programs designed for guidance computers used in command and lunar modules are presented. The purpose, functional description, assumptions, restrictions, and imitations are given for each program.
48 CFR 212.7002 - Pilot program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...
48 CFR 212.7002 - Pilot program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...
Wood transportation systems-a spin-off of a computerized information and mapping technique
William W. Phillips; Thomas J. Corcoran
1978-01-01
A computerized mapping system originally developed for planning the control of the spruce budworm in Maine has been extended into a tool for planning road net-work development and optimizing transportation costs. A budgetary process and a mathematical linear programming routine are used interactively with the mapping and information retrieval capabilities of the system...
PLANS; a finite element program for nonlinear analysis of structures. Volume 2: User's manual
NASA Technical Reports Server (NTRS)
Pifko, A.; Armen, H., Jr.; Levy, A.; Levine, H.
1977-01-01
The PLANS system, rather than being one comprehensive computer program, is a collection of finite element programs used for the nonlinear analysis of structures. This collection of programs evolved and is based on the organizational philosophy in which classes of analyses are treated individually based on the physical problem class to be analyzed. Each of the independent finite element computer programs of PLANS, with an associated element library, can be individually loaded and used to solve the problem class of interest. A number of programs have been developed for material nonlinear behavior alone and for combined geometric and material nonlinear behavior. The usage, capabilities, and element libraries of the current programs include: (1) plastic analysis of built-up structures where bending and membrane effects are significant, (2) three dimensional elastic-plastic analysis, (3) plastic analysis of bodies of revolution, and (4) material and geometric nonlinear analysis of built-up structures.
48 CFR 1819.7101 - Definition.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Definition. 1819.7101 Section 1819.7101 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Rural Area Small Business Plan 1819.7101 Definition. Rural...
Counter Trafficking System Development "Analysis Training Program"
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Dennis C.
This document will detail the training curriculum for the Counter-Trafficking System Development (CTSD) Analysis Modules and Lesson Plans are derived from the United States Military, Department of Energy doctrine and Lawrence Livermore National Laboratory (LLNL), Global Security (GS) S Program.
The Denver region traffic signal system improvement program : planning for management and operations
DOT National Transportation Integrated Search
2009-04-01
The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...
Keller, A
1991-01-01
A diagnosis was conducted of management information systems (MIS) for maternal and child health and family planning programs in 27 African, 5 Asian, and 8 Latin American and Caribbean countries. The diagnosis covered the collection and use of information on physical infrastructure, human resources, equipment/supplies, services provided, coverage attained, and program quality and impact. It was found that many programs do not produce certain basic input and output indicators and that even among those that do, information is too infrequently brought to bear on management decision-making. Constraints under which the MIS operate in these countries are identified, and some rudimentary calculations of what would be required to improve MIS functioning are made.
Integrated propulsion technology demonstrator. Program plan
NASA Technical Reports Server (NTRS)
1994-01-01
NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
...NMFS publishes regulations to implement Amendment 86 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area and Amendment 76 to the Fishery Management Plan for Groundfish of the Gulf of Alaska (Amendments 86/76). Amendments 86/ 76 add a funding and deployment system for observer coverage to the existing North Pacific Groundfish Observer Program (Observer Program) and amend existing observer coverage requirements for vessels and processing plants. The new funding and deployment system allows NMFS to determine when and where to deploy observers according to management and conservation needs, with funds provided through a system of fees based on the ex-vessel value of groundfish and halibut in fisheries covered by the new system. This action is necessary to resolve data quality and cost equity concerns with the Observer Program's existing funding and deployment structure. This action is intended to promote the goals and objectives of the Magnuson-Stevens Fishery Conservation and Management Act, the Northern Pacific Halibut Act of 1982, the fishery management plans, and other applicable law.
30 CFR 784.20 - Subsidence control plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.20... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Subsidence control plan. 784.20 Section 784.20...
DOT National Transportation Integrated Search
1997-09-01
Integration of intelligent transportation systems (ITS) within a metropolitan area is crucial for effective deployment. The Early Deployment Planning (EDP) Process is one tool that allows transportation officials to plan for and implement ITS technol...
The impact of health reform on the Medicare Advantage program: realigning payment with performance.
Biles, Brian; Casillas, Giselle; Arnold, Grace; Guterman, Stuart
2012-10-01
The Affordable Care Act enacts a new payment system for private health plans available to Medicare beneficiaries through the Medicare Advantage (MA) program. The system, which is being phased in through 2017, aims to (1) reduce the excess payments received by private plans relative to per capita spending in traditional Medicare, and (2) reward plans that earn high performance ratings. Using 2009 data, this issue brief presents analysis of the distributional impact on MA plan payments of these new policies as if they had been fully implemented in that year. We find that, when the polices [sic] are in place, they will bring overall MA plan payments nationwide down from 114 percent to 102 percent of what spending would have been for the same enrollees if they had been enrolled in traditional Medicare. While payments will vary across the nation, high-performing MA plans stand to benefit from this new arrangement.
2007-06-12
up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The
System design of the Pioneer Venus spacecraft. Volume 12: International cooperation
NASA Technical Reports Server (NTRS)
Kelly, R. S.
1973-01-01
A spectrum of plans has been prepared to illustrate the range of practical sharing possibilities available so as to assist Ames Research Center (ARC) and European Space Research Organization (ESRO) in selection of a program meeting mutual goals. Five plans are described showing increased participation by ESRO WITH ascending plan number. Each of these has sharing properties fulfilling particular requirements such as available ESRO budget level, extent of ESRO program responsibility, matching particular ESRO capability, and cost saving to ARC through sharing. All plans apply to orbiter sharing only. A sharing plan based on the model Plan 4 may offer the most attractive division of Pioneer Venus between ARC and ESRO. This plan allows ESRO to bear primary responsibility for the orbiter and to avoid an extensive financial burden. Savings to ARC are commensurate with ARC loss of program control. Duplication of effort is avoided by using orbiter subsystems that are common to the probe bus and orbiter.
... and School-Linked Dental Sealant Programs Coordinate Community Water Fluoridation Programs Targeted Clinical Preventive Services & Health Systems Changes State Oral Health Plans Research & Publications Oral Health In America: Summary of the ...
... and School-Linked Dental Sealant Programs Coordinate Community Water Fluoridation Programs Targeted Clinical Preventive Services & Health Systems Changes State Oral Health Plans Research & Publications Oral Health In America: Summary of the ...
The 1985 long-range program plan
NASA Technical Reports Server (NTRS)
1984-01-01
That continual evolution of NASA's research and development, is reflected in the missions, goals, and objectives planned for FY1985 and later years, in accordance with the responsibilities by the National Aeronautics and Space Act of 1958, as amended. New starts for the next ten years and space program activities to year 2000 are highlighted including space science and applications, space flight, space station, space tracking and data systems, and space research and technology. Space programs for the early 21st century and aeronautics programs up to and beyond the year 2000 are also covered.
Systems test facilities existing capabilities compilation
NASA Technical Reports Server (NTRS)
Weaver, R.
1981-01-01
Systems test facilities (STFS) to test total photovoltaic systems and their interfaces are described. The systems development (SD) plan is compilation of existing and planned STFs, as well as subsystem and key component testing facilities. It is recommended that the existing capabilities compilation is annually updated to provide and assessment of the STF activity and to disseminate STF capabilities, status and availability to the photovoltaics program.
Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview
NASA Technical Reports Server (NTRS)
1991-01-01
This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.
Utilizing grassroots workers in family planning programs in India: prospects and problems.
Mani, S B
1991-01-01
In order to rapidly expand the network of delivery systems and speed up the process of acceptance of family planning messages and methods, a shift took place in the Indian family planning program from the bureaucratic "clinical" approach to the people oriented "extension" approach. As a result, there is an increasing emphasis on moving the family planning efforts closer to the grassroots level. A key methodological issue centers on the proper selection, cultural acceptability, and the effectiveness of the grassroots workers who are to be trained and through whom family planning motivational messages and methods are to be introduced. The Indian government, from time to time, has trained and utilized different groups of grassroots workers in its family planning promotional efforts. Anthropological field studies were conducted in two different regions in India to examine the potential and actual roles of two groups of grassroots workers--opinion leaders and traditional birth attendants--in the delivery of family planning services in the rural areas. These studies revealed that while the traditional birth attendants can be trained and utilized to a limited extent in promoting family planning efforts, especially to the eligible female clients, the role of the opinion leaders in such efforts is at best questionable. Based on these field studies, cultural and technical (including bureaucratic) problems in training and utilizing opinion leaders and traditional birth attendants are explored in detail. Modifications in the training program strategies are suggested to improve and expand the family planning delivery system in rural India.
Here's How to Keep Your Music Program Humming.
ERIC Educational Resources Information Center
McCormick, Kathleen
1985-01-01
Some school systems are finding practical ways to enhance music programs. Experts suggest ways for schools to (1) build a marketing plan, (2) make it easier for children to participate in the music program, (3) provide reinforcement, and (4) publicize the program. (MLF)
Information systems requirements for the Microgravity Science and Applications Program
NASA Technical Reports Server (NTRS)
Kicza, M. E.; Kreer, J. R.
1991-01-01
NASA's Microgravity Science and Applications (MSAD) Program is presented. Additionally, the types of information produced wiithin the program and the anticipated growth in information system requirements as the program transitions to Space Station Freedom utilization are discussed. Plans for payload operations support in the Freedom era are addressed, as well as current activities to define research community requirements for data and sample archives.
Information systems requirements for the microgravity science and applications program
NASA Technical Reports Server (NTRS)
Kicza, M. E.; Kreer, J. R.
1990-01-01
NASA's Microgravity Science and Applications (MSAD) Program is presented. Additionally, the types of information produced within the program and the anticipated growth in information system requirements as the program transitions to Space Station Freedom utilization are discussed. Plans for payload operations support in the Freedom era are addressed, as well as current activities to define research community requirements for data and sample archives.
A knowledge-based approach to improving optimization techniques in system planning
NASA Technical Reports Server (NTRS)
Momoh, J. A.; Zhang, Z. Z.
1990-01-01
A knowledge-based (KB) approach to improve mathematical programming techniques used in the system planning environment is presented. The KB system assists in selecting appropriate optimization algorithms, objective functions, constraints and parameters. The scheme is implemented by integrating symbolic computation of rules derived from operator and planner's experience and is used for generalized optimization packages. The KB optimization software package is capable of improving the overall planning process which includes correction of given violations. The method was demonstrated on a large scale power system discussed in the paper.
ERIC Educational Resources Information Center
Findorff, Irene K.
This document summarizes the results of a project at Tulane University that was designed to adapt, test, and evaluate a computerized information and menu planning system utilizing linear programing techniques for use in school lunch food service operations. The objectives of the menu planning were to formulate menu items into a palatable,…
NOSC (Naval Ocean Systems Center) Program Manager’s Handbook.
1986-07-01
impact downstream on other obligations-can wreck the best program through loss of performance, credibility, sponsorship, and future opportunity...planning sessions should be alert to external constraints that may impact on the timely completion of the project. Networking, through planning sessions...schedule, will have significant impact on the project. One of the most important functions of project management
NASA Technical Reports Server (NTRS)
1971-01-01
The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.
48 CFR 1426.7102-2 - Requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Requirements. 1426.7102-2 Section 1426.7102-2 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7102-2 Requirements. (a) MBDA-91 Plan...
48 CFR 1426.7102-2 - Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Requirements. 1426.7102-2 Section 1426.7102-2 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Minority Business Reports 1426.7102-2 Requirements. (a) MBDA-91 Plan...
75 FR 35508 - Draft Regulatory Guide: Issuance, Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-22
... Systems and Networks,'' requires licensees to develop cyber-security plans and programs to protect critical digital assets, including digital safety systems, from malicious cyber attacks. Regulatory Guide 5.71, ``Cyber Security Programs for Nuclear Facilities,'' provides guidance to meet the requirements of...
Acquisition Systems Protection Planning the Manhatten Project: A Case Study
1994-06-03
This study examines the counterintelligence and security programs of the Manhattan Project , the United States acquisition of the atomic bomb, using...assessment methodology and counterintelligence techniques and procedures. Acquisition systems, Program protection, Manhattan Project , Atomic bomb, Technology protection, Counterintelligence, Security.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 5 2014-07-01 2014-07-01 false National Highway Systems Designation... IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2348 National Highway Systems Designation Act Motor Vehicle Inspection... the National Highway Systems Designation Act of 1995. If Utah County fails to start its program by...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 5 2013-07-01 2013-07-01 false National Highway Systems Designation... IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2348 National Highway Systems Designation Act Motor Vehicle Inspection... the National Highway Systems Designation Act of 1995. If Utah County fails to start its program by...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 5 2012-07-01 2012-07-01 false National Highway Systems Designation... IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2348 National Highway Systems Designation Act Motor Vehicle Inspection... the National Highway Systems Designation Act of 1995. If Utah County fails to start its program by...
Contraceptive social marketing and community-based distribution systems in Colombia.
Vernon, R; Ojeda, G; Townsend, M C
1988-01-01
Three operations research experiments were carried out in three provinces of Colombia to improve the cost-effectiveness of Profamilia's nonclinic-based programs. The experiments tested: (a) whether a contraceptive social marketing (CSM) strategy can replace a community-based distribution (CBD) program in a high contraceptive use area; (b) if wage incentives for salaried CBD instructors will increase contraceptive sales; and (c) whether a specially equipped information, education, and communication (IEC) team can replace a cadre of rural promoters to expand family planning coverage. All three strategies proved to be effective, but only the CSM system yielded a profit. Despite this, Profamilia discontinued its CSM program soon after the experiment was completed. Unexpected government controls regulating the price and sale of contraceptives in Colombia made the program unprofitable. As a result, family planning agencies are cautioned against replacing CBD programs with CSM. Instead, CBD programs might adopt a more commercial approach to become more efficient.
Overcoming Health System Challenges for Women and Children Living With HIV Through the Global Plan.
Modi, Surbhi; Callahan, Tegan; Rodrigues, Jessica; Kajoka, Mwikemo D; Dale, Helen M; Langa, Judite O; Urso, Marilena; Nchephe, Matsepeli I; Bongdene, Helene; Romano, Sostena; Broyles, Laura N
2017-05-01
To meet the ambitious targets set by the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), the initial 22 priority countries quickly developed innovative approaches for overcoming long-standing health systems challenges and providing HIV testing and treatment to pregnant and breastfeeding women and their infants. The Global Plan spurred programs for prevention of mother-to-child HIV transmission to integrate HIV-related care and treatment into broader maternal, newborn, and child health services; expand the effectiveness of the health workforce through task sharing; extend health services into communities; strengthen supply chain and commodity management systems; reduce diagnostic and laboratory hurdles; and strengthen strategic supervision and mentorship. The article reviews the ongoing challenges for prevention of mother-to-child HIV transmission programs as they continue to strive for elimination of vertical transmission of HIV infection in the post-Global Plan era. Although progress has been rapid, health systems still face important challenges, particularly follow-up and diagnosis of HIV-exposed infants, continuity of care, and the promotion of services that are respectful and client centered.
Overcoming Health System Challenges for Women and Children Living With HIV Through the Global Plan
Modi, Surbhi; Callahan, Tegan; Rodrigues, Jessica; Kajoka, Mwikemo D.; Dale, Helen M.; Langa, Judite O.; Urso, Marilena; Nchephe, Matsepeli I.; Bongdene, Helene; Romano, Sostena; Broyles, Laura N.
2017-01-01
To meet the ambitious targets set by the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), the initial 22 priority countries quickly developed innovative approaches for overcoming long-standing health systems challenges and providing HIV testing and treatment to pregnant and breastfeeding women and their infants. The Global Plan spurred programs for prevention of mother-to-child HIV transmission to integrate HIV-related care and treatment into broader maternal, newborn, and child health services; expand the effectiveness of the health workforce through task sharing; extend health services into communities; strengthen supply chain and commodity management systems; reduce diagnostic and laboratory hurdles; and strengthen strategic supervision and mentorship. The article reviews the ongoing challenges for prevention of mother-to-child HIV transmission programs as they continue to strive for elimination of vertical transmission of HIV infection in the post-Global Plan era. Although progress has been rapid, health systems still face important challenges, particularly follow-up and diagnosis of HIV-exposed infants, continuity of care, and the promotion of services that are respectful and client centered. PMID:28399000
A Systems Thinking Approach to Leadership and Change: Community College
ERIC Educational Resources Information Center
Jones, Anthony
2012-01-01
This is a research-based action and strategy planning study incorporating a holistic systems approach to program continuance at a local college. In the spring semester of 2010, the college administration decided to discontinue three programs at the college due to declining enrollment. One of these programs was the Real Estate Department which had…
Kuroda, Takeshi; Tanabe, Naohito; Kobayashi, Daisuke; Sato, Hiroe; Wada, Yoko; Murakami, Shuichi; Sakatsume, Minoru; Nakano, Masaaki; Narita, Ichiei
2011-09-01
Reactive amyloidosis is a serious systemic disease in rheumatoid arthritis (RA). Amyloid protein can be deposited in kidneys, heart or gastrointestinal tract leading to organ failure. Renal involvement is a well-known complication in amyloidosis as this may culminate in end-stage renal disease (ESRD). Hemodialysis (HD) is always considered the treatment of choice for such patients; however, the prognosis is usually poor due to a large number of sudden deaths immediately following HD therapy. To circumvent the problem of HD initiation while instituting HD safety, we devised a plan to start HD and compare patient's survival with our previous data. Sixty-three patients were treated with HD. They were categorized according to the initiation of first dialysis. All patients were divided into planned, unplanned and programmed initiation groups. First dialysis that had been initiated as not urgent was considered 'planned' (20 patients). First dialysis that had been performed urgently for life-threatening renal insufficiency was considered 'unplanned' (31 patients). First dialysis that had been initiated as not urgent and according to our dialysis program was considered 'programmed' (12 patients). Survival of these 63 patients from the initiation of HD at 38 days was 75%, at 321 days was 50% and at 1,784 days was 25%. Patients with unplanned initiation of HD showed a significant poor survival compared with those of both planned and programmed initiation. Additionally, patients with planned and programmed initiation of HD showed no significant difference for the patients' survival. Our study demonstrates that patients with amyloidosis have a higher mortality rate. Nevertheless, programmed initiation of HD will improve the prognosis of patients with ESRD. Such possibility needs to be considered in more detail in the future.
... and School-Linked Dental Sealant Programs Coordinate Community Water Fluoridation Programs Targeted Clinical Preventive Services & Health Systems Changes State Oral Health Plans Research & Publications Oral Health In America: Summary of the ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woods, T.W.
1991-09-01
This report is volume 3, part B, of the program to satisfy the allocated requirements of the Office of Civilian Radioactive Waste Management Program, in the development of the nuclear waste management system. The report is divided into the following sections: regulatory compliance; external relations; international programs; strategic and contingency planning; contract business management; and administrative services. (CS)
NASA's Radioisotope Power Systems Planning and Potential Future Systems Overview
NASA Technical Reports Server (NTRS)
Zakrajsek, June F.; Woerner, Dave F.; Cairns-Gallimore, Dirk; Johnson, Stephen G.; Qualls, Louis
2016-01-01
The goal of NASA's Radioisotope Power Systems (RPS) Program is to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet the needs of the missions. To meet this goal, the RPS Program, working closely with the Department of Energy, performs mission and system studies (such as the recently released Nuclear Power Assessment Study), assesses the readiness of promising technologies to infuse in future generators, assesses the sustainment of key RPS capabilities and knowledge, forecasts and tracks the Program's budgetary needs, and disseminates current information about RPS to the community of potential users. This process has been refined and used to determine the current content of the RPS Program's portfolio. This portfolio currently includes an effort to mature advanced thermoelectric technology for possible integration into an enhanced Multi-Mission Radioisotope Generator (eMMRTG), sustainment and production of the currently deployed MMRTG, and technology investments that could lead to a future Stirling Radioisotope Generator (SRG). This paper describes the program planning processes that have been used, the currently available MMRTG, and one of the potential future systems, the eMMRTG.
NASA's Radioisotope Power Systems Planning and Potential Future Systems Overview
NASA Technical Reports Server (NTRS)
Zakrajsek, June F.; Woerner, Dave F.; Cairns-Gallimore, Dirk; Johnson, Stephen G.; Qualis, Louis
2016-01-01
The goal of NASA's Radioisotope Power Systems (RPS) Program is to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet the needs of the missions. To meet this goal, the RPS Program, working closely with the Department of Energy, performs mission and system studies (such as the recently released Nuclear Power Assessment Study), assesses the readiness of promising technologies to infuse in future generators, assesses the sustainment of key RPS capabilities and knowledge, forecasts and tracks the Programs budgetary needs, and disseminates current information about RPS to the community of potential users. This process has been refined and used to determine the current content of the RPS Programs portfolio. This portfolio currently includes an effort to mature advanced thermoelectric technology for possible integration into an enhanced Multi-Mission Radioisotope Generator (eMMRTG), sustainment and production of the currently deployed MMRTG, and technology investments that could lead to a future Stirling Radioisotope Generator (SRG). This paper describes the program planning processes that have been used, the currently available MMRTG, and one of the potential future systems, the eMMRTG.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.
1993-01-01
In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.
ERIC Educational Resources Information Center
Nowrasteh, Daryush M.
This publication is designed to serve state-level planners interested in reviewing the key concepts of state planning and management systems. The compact nature of the review and its organization in guideline format should provide a ready reference for the practitioner seeking to develop and improve management systems for vocational education in…
Earth Observing System/Advanced Microwave SoundingUnit-A (EOS/AMSU-A): Acquisition activities plan
NASA Technical Reports Server (NTRS)
Schwantje, Robert
1994-01-01
This is the acquisition activities plan for the software to be used in the Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) system. This document is submitted in response to Contract NAS5-323 14 as CDRL 508. The procurement activities required to acquire software for the EOS/AMSU-A program are defined.
Systems Engineering Applied to Training.
ERIC Educational Resources Information Center
Silvern, Leonard C.
Written for training directors and human resource developers who have had experience and now need a systematic way to plan new programs, this book presents a new way of thinking about human learning and of organizing programs which has been developed from the systems engineering field. A first chapter explains what is meant by "systems"…
Indonesia. B. The building of a successful population-family planning programme.
Suyono, H
1984-01-01
Indonesia's population and family planning program is one of the most successful in the world, but much work must be done to meet the reduction in fertility targets set by the government. The goal is a birthrate of 22/1000 by the year 1990, a 50% decrease from the 1970 birthrate. With eligible couples entering the program at a rate of 600,000-750,000, a hard job lies ahead. The basic tenets which have made the Indonesia program strong will be used to meet the goals for 1990. The first of these is political commitment, meaning that all government leaders, from the President to the village chief, back the program and work actively for its success. Along with political commitment is the use of cultural values. The javanese society is feudal, in the sense that people try to respect elders, both leaders in the village and beyond. Thus, when the President speaks in favor of family planning, it carries considerable weight and significance. The village chief speaks favorably of family planning and that means the villagers are receptive to trying it. Another important cultural tenet is that of mutual help, or what is termed "gotong royong." This system goes back for centuries and forms the basis of village interaction. It is simply that people help each other for the common good. The National Family Planning Coordinating Board (BKKBN), with the help of the formal and informal leaders, has defined family planning as something which is for the mutual benefit of the entire community. A 3rd tenet of the program is flexibility. The BKKBN has continually experimented with various approaches. With flexibility comes some risk. The BKKBN has managed to maintain a system whereby it is possible to take risks, and this element of flexibility has benefitted the program greatly. Ownership is another important tenet of the program. The community feels that the program is theirs and that they can decide the activities of the acceptor groups and that they are responsible for maintaining and sustaining one another. The final tenet, which has aided in the development of a successful program, is that the BKKBN is the sole coordinator of the program, responsible for all family planning activities in both the public and private sector. These tenets and others will be used in the future in an effort to meet the 1990 targets.
Lam, Sean Shao Wei; Zhang, Ji; Zhang, Zhong Cheng; Oh, Hong Choon; Overton, Jerry; Ng, Yih Yng; Ong, Marcus Eng Hock
2015-02-01
Dynamically reassigning ambulance deployment locations throughout a day to balance ambulance availability and demands can be effective in reducing response times. The objectives of this study were to model dynamic ambulance allocation plans in Singapore based on the system status management (SSM) strategy and to evaluate the dynamic deployment plans using a discrete event simulation (DES) model. The geographical information system-based analysis and mathematical programming were used to develop the dynamic ambulance deployment plans for SSM based on ambulance calls data from January 1, 2011, to June 30, 2011. A DES model that incorporated these plans was used to compare the performance of the dynamic SSM strategy against static reallocation policies under various demands and travel time uncertainties. When the deployment plans based on the SSM strategy were followed strictly, the DES model showed that the geographical information system-based plans resulted in approximately 13-second reduction in the median response times compared to the static reallocation policy, whereas the mathematical programming-based plans resulted in approximately a 44-second reduction. The response times and coverage performances were still better than the static policy when reallocations happened for only 60% of all the recommended moves. Dynamically reassigning ambulance deployment locations based on the SSM strategy can result in superior response times and coverage performance compared to static reallocation policies even when the dynamic plans were not followed strictly. Copyright © 2014 Elsevier Inc. All rights reserved.
Strategic planning for clinical services: St. Joseph Hospital and Health Care Center.
Linggi, A; Pelham, L D
1986-09-01
A pharmacy department at a 340-bed community hospital based its strategic plan for developing patient-oriented services on a sound drug distribution system, a credible work-measurement program, and fiscal responsibility. In 1982 the department of pharmacy and i.v. therapy implemented a strategic plan for improving pharmaceutical services. The plan involved developing goals and objectives for the department; marketing the department's services and fiscal management to hospital administrators, medical staff, and nursing staff; building teamwork among the pharmacy staff; and improving the drug distribution system before instituting clinical services. Hiring of additional pharmacy staff was justified on the basis of work-measurement data. By adjusting staffing levels every two weeks based on work-measurement data, the department increased the efficiency of drug distribution activities; the pharmacy also implemented cost-saving programs like selection of therapeutic alternates and formulary restrictions. The savings were then reinvested in labor-intensive patient-oriented pharmaceutical services. A staff development program using staff pharmacists as preceptors expanded the breadth and depth of pharmacists' clinical skills. The planning efforts were successful because the needs of hospital administrators, the pharmacy department, and staff members were addressed.
... and School-Linked Dental Sealant Programs Coordinate Community Water Fluoridation Programs Targeted Clinical Preventive Services & Health Systems Changes State Oral Health Plans Research & Publications Oral Health In America: Summary of the ...
... and School-Linked Dental Sealant Programs Coordinate Community Water Fluoridation Programs Targeted Clinical Preventive Services & Health Systems Changes State Oral Health Plans Research & Publications Oral Health In America: Summary of the ...
... and School-Linked Dental Sealant Programs Coordinate Community Water Fluoridation Programs Targeted Clinical Preventive Services & Health Systems Changes State Oral Health Plans Research & Publications Oral Health In America: Summary of the ...
NASA Technical Reports Server (NTRS)
1991-01-01
Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.
Spectrum orbit utilization program technical manual SOUP5 Version 3.8
NASA Technical Reports Server (NTRS)
Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.
1984-01-01
The underlying engineering and mathematical models as well as the computational methods used by the SOUP5 analysis programs, which are part of the R2BCSAT-83 Broadcast Satellite Computational System, are described. Included are the algorithms used to calculate the technical parameters and references to the relevant technical literature. The system provides the following capabilities: requirements file maintenance, data base maintenance, elliptical satellite beam fitting to service areas, plan synthesis from specified requirements, plan analysis, and report generation/query. Each of these functions are briefly described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.
Pratt, Abigail; Dale, Martin; Olivi, Elena; Miller, Jane
2014-12-01
In late 2012 and in conjunction with South Sudan's Ministry of Health - National Malaria Control Program, PSI (Population Services International) conducted a comprehensive mapping exercise to assess geographical coverage of its integrated community case management (iCCM) program and consider scope for expansion. The operational research was designed to provide evidence and support for low-cost mapping and monitoring systems, demonstrating the use of technology to enhance the quality of programming and to allow for the improved allocation of resources through appropriate and need-based deployment of community-based distributors (CBDs). The survey took place over the course of three months and program staff gathered GPS (global positioning system) data, along with demographic data, for over 1200 CBDs and 111 CBD supervisors operating in six counties in South Sudan. Data was collated, cleaned and quality assured, input into an Excel database, and subsequently uploaded to geographic information system (GIS) for spatial analysis and map production. The mapping results showed that over three-quarters of CBDs were deployed within a five kilometer radius of a health facility or another CBD, contrary to program planning and design. Other characteristics of the CBD and CBD supervisor profiles (age, gender, literacy) were more closely matched with other regional programs. The results of this mapping exercise provided a valuable insight into the contradictions found between a program "deployment plan" and the realities observed during field implementation. It also highlighted an important need for program implementers and national-level strategy makers to consider the natural and community-driven diffusion of CBDs, and take into consideration the strength of the local health facilities when developing a deployment plan.
Summary of NASA-Lewis Research Center solar heating and cooling and wind energy programs
NASA Technical Reports Server (NTRS)
Vernon, R. W.
1975-01-01
NASA is planning to construct and operate a solar heating and cooling system in conjunction with a new office building being constructed at Langley Research Center. The technology support for this project will be provided by a solar energy program underway at NASA's Lewis Research Center. The solar program at Lewis includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. NASA-Lewis has been assisting the National Science Foundation and now the Energy Research and Development Administration in planning and executing a national wind energy program. The areas of the wind energy program that are being conducted by Lewis include: design and operation of a 100 kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.
The Atlanta Dropout Prevention Plan.
ERIC Educational Resources Information Center
Jonas, Edward D., Jr.
The Atlanta (Georgia) Public School System (APS) has many existing dropout prevention programs, but they have been operating primarily independently, with limited information sharing or coordination. In 1986 these programs were linked through the formation of the Atlanta Dropout Prevention Collaborative, which unites the public school system with…
Idaho National Laboratory Site Pollution Prevention Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. D. Sellers
2007-03-01
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less
Supporting research and technology for automotive Stirling engine development
NASA Technical Reports Server (NTRS)
Tomazic, W. A.
1980-01-01
The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.
14 CFR 152.325 - Financial status report: Airport planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Financial status report: Airport planning... agency conducting a project for airport system planning shall submit a financial status report on a form... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2014 CFR
2014-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2011 CFR
2011-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2012 CFR
2012-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
VCE testbed program planning and definition study
NASA Technical Reports Server (NTRS)
Westmoreland, J. S.; Godston, J.
1978-01-01
The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.
NASA Technical Reports Server (NTRS)
Wilkinson, W. H.; Kirkhart, F. P.; Kistler, C. W.; Duckworth, W. H.; Ungar, E. W.; Foster, E. L.
1970-01-01
Technical problems of design and flight qualification of the proposed classes of surface insulation materials and leading edge materials were reviewed. A screening test plan, a preliminary design data test plan and a design data test plan were outlined. This program defined the apparent critical differences between the surface insulators and the leading edge materials, structuring specialized screening test plans for each of these two classes of materials. Unique testing techniques were shown to be important in evaluating the structural interaction aspects of the surface insulators and a separate task was defined to validate the test plan. In addition, a compilation was made of available information on proposed material (including metallic TPS), previous shuttle programs, pertinent test procedures, and other national programs of merit. This material was collected and summarized in an informally structured workbook.
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
Computer Programs For Automated Welding System
NASA Technical Reports Server (NTRS)
Agapakis, John E.
1993-01-01
Computer programs developed for use in controlling automated welding system described in MFS-28578. Together with control computer, computer input and output devices and control sensors and actuators, provide flexible capability for planning and implementation of schemes for automated welding of specific workpieces. Developed according to macro- and task-level programming schemes, which increases productivity and consistency by reducing amount of "teaching" of system by technician. System provides for three-dimensional mathematical modeling of workpieces, work cells, robots, and positioners.
The Warm-Hot Intergalactic Medium
NASA Technical Reports Server (NTRS)
Hayes, Jeffrey (Technical Monitor)
2005-01-01
This grant is associated to a 5-year LTSA grant, on "Studying the Largest Reservoir of Baryons in the Universe: The Warm-Hot Intergalactic Medium". The first year of work within this program has been very rich, and has already produced several important results, as detailed in this paper. Table 2 of our original proposal justification, listed the planned year-by-year program, divided into two sub-fields: (A) the study of the z=0 (or Local Group WHIM) system, and (B) the study of the z greater than 0 (i.e- intervening WHIM) systems. For each of the two sub-fields we had planned to analyze, in the first year, a number of archival (Chandra, XMM and FUSE) and new (if observed) sightlines. Moreover, the plan for the z=0 system included the search for new interesting sightlines. We have accomplished all these tasks.
Puerto Rico water resources planning model program description
Moody, D.W.; Maddock, Thomas; Karlinger, M.R.; Lloyd, J.J.
1973-01-01
Because the use of the Mathematical Programming System -Extended (MPSX) to solve large linear and mixed integer programs requires the preparation of many input data cards, a matrix generator program to produce the MPSX input data from a much more limited set of data may expedite the use of the mixed integer programming optimization technique. The Model Definition and Control Program (MODCQP) is intended to assist a planner in preparing MPSX input data for the Puerto Rico Water Resources Planning Model. The model utilizes a mixed-integer mathematical program to identify a minimum present cost set of water resources projects (diversions, reservoirs, ground-water fields, desalinization plants, water treatment plants, and inter-basin transfers of water) which will meet a set of future water demands and to determine their sequence of construction. While MODCOP was specifically written to generate MPSX input data for the planning model described in this report, the program can be easily modified to reflect changes in the model's mathematical structure.
Current Strategic Business Plan for the Implementation of Digital Systems.
ERIC Educational Resources Information Center
Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.
This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... plans for prescription medicines for children in Tribal foster care systems. SUMMARY: The Administration... development of oversight plans for prescription medicines for children in Tribal foster care systems. The... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families [CFDA Number: 93...
Internet-based system for simulation-based medical planning for cardiovascular disease.
Steele, Brooke N; Draney, Mary T; Ku, Joy P; Taylor, Charles A
2003-06-01
Current practice in vascular surgery utilizes only diagnostic and empirical data to plan treatments, which does not enable quantitative a priori prediction of the outcomes of interventions. We have previously described simulation-based medical planning methods to model blood flow in arteries and plan medical treatments based on physiologic models. An important consideration for the design of these patient-specific modeling systems is the accessibility to physicians with modest computational resources. We describe a simulation-based medical planning environment developed for the World Wide Web (WWW) using the Virtual Reality Modeling Language (VRML) and the Java programming language.
Halogen occultation experiment intergrated test plan
NASA Technical Reports Server (NTRS)
Mauldin, L. E., III; Butterfield, A. J.
1986-01-01
The test program plan is presented for the Halogen Occultation Experiment (HALOE) instrument, which is being developed in-house at the Langley Research Center for the Upper Atmosphere Research Satellite (UARS). This comprehensive test program was developed to demonstrate that the HALOE instrument meets its performance requirements and maintains integrity through UARS flight environments. Each component, subsystem, and system level test is described in sufficient detail to allow development of the necessary test setups and test procedures. Additionally, the management system for implementing this test program is given. The HALOE instrument is a gas correlation radiometer that measures vertical distribution of eight upper atmospheric constituents: O3, HC1, HF, NO, CH4, H2O, NO2, and CO2.
Private Well Water and Fluoride
... and School-Linked Dental Sealant Programs Coordinate Community Water Fluoridation Programs Targeted Clinical Preventive Services & Health Systems Changes State Oral Health Plans Research & Publications Oral Health In America: Summary of the ...
Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-12-01
The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts asmore » a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.« less
Aviation Capacity Enhancement (ACE) Plan
DOT National Transportation Integrated Search
1996-12-31
A comprehensive review of Federal Aviation Administration programs intended to improve the capacity of the National Air Transportation System. The Plan describes the extent of capacity and delay problems currently associated with air travel in the U....
1995 Aviation Capacity Enhancement (ACE) Plan
DOT National Transportation Integrated Search
1995-12-31
A comprehensive review of Federal Aviation Administration programs intended to improve : the capacity of the National Air Transportation System. The Plan describes the extent of capacity : and delay problems currently associated with air travel in th...
Townsend, Julie S.; Moore, Angela R.; Mulder, Tiffani N.; Boyd, Mary
2015-01-01
Context The National Comprehensive Cancer Control Program (NCCCP) performance measurement system seeks to understand both the processes that funded programs undertake with their respective coalitions to implement the objectives of their cancer plans and outcomes of those efforts. Objective To identify areas of achievement and technical assistance needs of NCCCP awardees. Design Program performance was assessed through surveys completed by program directors on performance indicators in 2009 and 2010 and queries from a web-based management information system in 2011 and 2012. Setting Programs funded by CDC’s NCCCP. Participants 69 programs. Main Outcome Measure(s) The key performance measures assessed were: inclusion of diverse partners and key sectors in cancer coalitions; partners’ involvement in activities; receiving in-kind resources from partners; using evidence-based interventions and data for setting priorities; conducting program evaluation; using community- or organization-level strategies to address cancer control efforts; and demonstrating progress toward achieving health outcomes. Results Most programs reported having active coalitions that represent diverse organizational sectors. Nearly all programs routinely assess the burden of cancer. In-kind resources to implement activities peaked at $64,716 in the second year of a five year funding cycle, and declined in subsequent project years. By year 3, over 70% of programs reported having an evaluation plan. While programs reported that nearly two-thirds of their interventions were evidence-based, some programs implemented non-evidence-based interventions. A majority of programs successfully used at least one community- or organization-level change strategy. However, many programs did not incorporate objectives linked to health outcomes as they reported progress in implementing interventions. Conclusions: While NCCCP programs were strong at building and maintaining infrastructure, some programs may need additional technical assistance to increase the adoption of evidence-based interventions, develop solid and responsive evaluation plans, and better link efforts to population-based measures that demonstrate impact toward reducing the burden of cancer. PMID:25136936
Defense Analysis in the United States.
1979-04-06
and Army process for planning, program - ming, conduct, and reporting of studies, and provides a list of references pertaining to studies and analyses...of analytical activities In a military service, an overviev of the U.S. Army analysis agencies is given. The paper also describes the U.S. DOD and...tactics, doctrine, policies, force plans, strategies, procedures, intelligence, weapons selection and mix, systems, program , or resources, and leading to
ERIC Educational Resources Information Center
Daniel, Clarence H.
This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…
Daniel Navon
1978-01-01
These 14 papers were submitted to a conference of Project Group P4.07 Division IV, International Union of Forestry Research Organizations. Topics discussed included the uses of simulations, analytical techniques, and mathematical programming techniques in land management planning, reforestation programs, intensive forestry, timber management and production, tree growth...
NASA Technical Reports Server (NTRS)
Clauson, J.; Heuser, J.
1981-01-01
The Applications Data Service (ADS) is a system based on an electronic data communications network which will permit scientists to share the data stored in data bases at universities and at government and private installations. It is designed to allow users to readily locate and access high quality, timely data from multiple sources. The ADS Pilot program objectives and the current plans for accomplishing those objectives are described.
ERIC Educational Resources Information Center
MCKEE, ROBERT L.; RIDLEY, KATHRYN J.
TO ESTABLISH A COLLEGE IN 100 DAYS PRESENTED AN OPPORTUNITY TO TEST THE VALUE OF PROGRAMED ORGANIZATIONAL PROCEDURES USING PROGRAM PERFORMANCE EVALUATION AND REVIEW TECHNIQUE (PERT) UNDER ACTUAL OPERATIONAL CONDITIONS, NOT IN A SIMULATED THEORETICAL SITUATION. THROUGH THE AID OF THE PERT PLANNING SYSTEM, IT WAS DETERMINED THAT THERE WERE NINE…
HYPERSAMP - HYPERGEOMETRIC ATTRIBUTE SAMPLING SYSTEM BASED ON RISK AND FRACTION DEFECTIVE
NASA Technical Reports Server (NTRS)
De, Salvo L. J.
1994-01-01
HYPERSAMP is a demonstration of an attribute sampling system developed to determine the minimum sample size required for any preselected value for consumer's risk and fraction of nonconforming. This statistical method can be used in place of MIL-STD-105E sampling plans when a minimum sample size is desirable, such as when tests are destructive or expensive. HYPERSAMP utilizes the Hypergeometric Distribution and can be used for any fraction nonconforming. The program employs an iterative technique that circumvents the obstacle presented by the factorial of a non-whole number. HYPERSAMP provides the required Hypergeometric sample size for any equivalent real number of nonconformances in the lot or batch under evaluation. Many currently used sampling systems, such as the MIL-STD-105E, utilize the Binomial or the Poisson equations as an estimate of the Hypergeometric when performing inspection by attributes. However, this is primarily because of the difficulty in calculation of the factorials required by the Hypergeometric. Sampling plans based on the Binomial or Poisson equations will result in the maximum sample size possible with the Hypergeometric. The difference in the sample sizes between the Poisson or Binomial and the Hypergeometric can be significant. For example, a lot size of 400 devices with an error rate of 1.0% and a confidence of 99% would require a sample size of 400 (all units would need to be inspected) for the Binomial sampling plan and only 273 for a Hypergeometric sampling plan. The Hypergeometric results in a savings of 127 units, a significant reduction in the required sample size. HYPERSAMP is a demonstration program and is limited to sampling plans with zero defectives in the sample (acceptance number of zero). Since it is only a demonstration program, the sample size determination is limited to sample sizes of 1500 or less. The Hypergeometric Attribute Sampling System demonstration code is a spreadsheet program written for IBM PC compatible computers running DOS and Lotus 1-2-3 or Quattro Pro. This program is distributed on a 5.25 inch 360K MS-DOS format diskette, and the program price includes documentation. This statistical method was developed in 1992.
Using Sequence Diagrams to Detect Communication Problems Between Systems
NASA Technical Reports Server (NTRS)
Lindvall, Mikael; Ackermann, Chris; Stratton, William C.; Sibol, Deane E.; Ray, Arnab; Yonkwa, Lyly; Kresser, Jan; Godfrey, Sally H.; Knodel, Jens
2008-01-01
Many software systems are evolving complex system of systems (SoS) for which inter-system communication is both mission-critical and error-prone. Such communication problems ideally would be detected before deployment. In a NASA-supported Software Assurance Research Program (SARP) project, we are researching a new approach addressing such problems. In this paper, we show that problems in the communication between two systems can be detected by using sequence diagrams to model the planned communication and by comparing the planned sequence to the actual sequence. We identify different kinds of problems that can be addressed by modeling the planned sequence using different level of abstractions.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
A cost-benefit analysis of the Mexican Social Security Administration's family planning program.
Nortman, D L; Halvas, J; Rabago, A
1986-01-01
A cost-benefit analysis of the family planning program of the Mexican Social Security System (IMSS) was undertaken to test the hypothesis that IMSS's family planning services yield a net savings to IMSS by reducing the load on its maternal and infant care service. The cost data are believed to be of exceptionally high quality because they were empirically ascertained by a retrospective and prospective survey of unit time and personnel costs per specified detailed type of service in 37 IMSS hospitals and 16 clinics in 13 of Mexico's 32 states. Based on the average cost per case, the analysis disclosed that for every peso (constant 1983 currency) that IMSS spent on family planning services to its urban population during 1972-1984 inclusive, the agency saved nine pesos. The article concludes by raising the speculative question as to the proportion of the births averted by the IMSS family planning program that would have been averted in the absence of IMSS's family planning services.
[Plan to improve malaria control towards its elimination in Mesoamerica].
Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco
2011-01-01
To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.
Manual for a Volunteer Services System.
ERIC Educational Resources Information Center
Helgerson, Linda; And Others
This manual presents guidelines for planning, monitoring, and controlling the development and operation of volunteer assistance programs. The materials included address questions related to both the process of establishing a volunteer program and the administration of a volunteer management system. The manual is not intended to provide a blueprint…
Computerized commodity management system in Thailand and Brazil.
1984-01-01
Thailand's National Family Planning Program is testing a computerized contraceptive commodity reporting management in 4 provinces with 104 National Family Planning Program (NFPP) reporting entities. Staff in the Brazilian Association of Family Planning Entities (ABEPF) and CPAIMC, a major family planning service agency, have been trained in the use of a computerized commodity distribution management system and are ready to initiate test use. The systems were designed in response to specific commodity management needs of the concerned organizations. Neither distribution program functions as a contraceptive social marketing (CSM) program, but each system reviewed has aspects that are relevant to CSM commodity management needs. Both the Thai and Brazilian systems were designed to be as automatic and user friendly as possible. Both have 3 main databases and perform similar management and reporting functions. Differing program configurations and basic data forms reflect the specific purposes of each system. Databases for the logistics monitoring system in Thailand arethe reporting entity (or ID) file; the current month's data file; and the master balance file. The data source is the basic reporting form that also serves as a Request and Issue Voucher for commodities. Editing functions in the program check to see that the current "beginning balance" equals the previous month's ending balance. Indexing functions in the system allow direct access to the records of any reporting entity via the ID number, as well as the sequential processing of records by ID number. 6 reports can be generated: status report by issuing entity; status report by dispensing entity; aggregate status report; out of compliance products report; out of compliance outlets report; and suggested shipment to regional warehouse report. Databases for the distribution management system in Brazil are: the name-ID (client institution) file; the product file; and the data file. The data source is an order form that contains a client code similar to the code used in Thailand. An interrogative data entry program enhances the management function of the system. 8 reports can be individually issued: a status report on back orders by product; a status report on back orders by institution and product; a historical report of year to date shipments and value by product; a historical report of year to date shipments by client and product; year to date payment reports from each client; outstanding invoices by month for the previous 12 months; a product report showing the amount of each product or order with outstanding invoices; and a stock position report.
DOT National Transportation Integrated Search
2013-01-01
The Exploratory Advanced Research (EAR) Program addresses the need for longer term, higher risk research with the potential for longterm improvements to transportation systems-improvements in planning, building, renewing, and operating safe, congesti...
National plan to enhance aviation safety through human factors improvements
NASA Technical Reports Server (NTRS)
Foushee, Clay
1990-01-01
The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.
Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth
2018-01-01
The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544
Corriero, Rosemary; Redmon, Ginger
Before participating in a project funded by the Centers for Disease Control and Prevention, most state and local health departments (LHDs) were not seeking reimbursement or being fully reimbursed by insurance plans for the cost of immunization services (including vaccine costs and administration fees) they provided to insured patients. Centers for Disease Control and Prevention's Billables Project was designed to enable state and LHDs to bill public and private insurance plans for immunization services provided to insured patients. Identify and describe key barriers state and LHDs may encounter while planning and implementing a billing program, as well as possible solutions for overcoming those barriers. This study used reports from Billables Project participants to explore barriers they encountered when planning and implementing a billing program and steps taken to address those barriers. Thirty-eight state immunization programs. Based on project participants' reports, barriers were noted in 7 categories: (1) funding and costs, (2) staff, (3) health department characteristics, (4) third-party payers and insurance plans, (5) software, (6) patient insurance status, and (7) other barriers. Possible solutions for overcoming those barriers included hiring or seeking external help, creating billing guides and training modules, streamlining workflows, and modifying existing software systems. Overcoming barriers during planning and implementation of a billing program can be challenging for state and LHDs, but the experiences and suggestions of past Billables Project participants can help guide future billing program efforts.
Laser Pyro System Standardization and Man Rating
NASA Technical Reports Server (NTRS)
Brown, Christopher W.
2004-01-01
This viewgraph presentation reviews an X-38 laser pyro system standardization system designed for a new manned rated program. The plans to approve this laser initiation system and preliminary ideas for this system are also provided.
Evaluation plan : the Branson Travel and Recreational Information Program field operational test
DOT National Transportation Integrated Search
1998-02-25
The Branson Travel and Recreational Information Program (TRIP) is a Field Operational Test (FOT) of Traveler Information Services in Tourism Areas funded through the National Advanced Rural Transportation Systems Program. Over the past ten years, Bra...
The commercial implications of the EELV program
NASA Astrophysics Data System (ADS)
Sasso, Steven E.
1998-01-01
There have been several studies over the past 15 years intended to define and develop a space launch system that would meet future needs of the United States Government (USG). While these past studies (Advanced Launch System, National Launch System, Spacelifter, etc) yielded valuable data, none were carried to fruition. Overriding issues included high development cost, changing requirements, and uncertainty in the mission model, as well lack of a clear direction for where this nation should be headed. In 1995, the Air Force embarked on the Evolved Expendable Launch Vehicle (EELV) program as a way of defining and developing the next-generation expendable launch system. This time groundrules for this effort were clearly defined-the program relied on the use of evolving a system rather than developing a high-technology solution to reduce development cost, and the commercial market was factored in as a way of reducing cost to the USG. The EELV program is nearing the engineering manufacturing development (EMD) phase by mid-1998 with first flight planned for early 2001. This paper describes the planned Lockheed Martin EELV program and its ability to utilize the commercial market to benefit the USG in its need to develop the next-generation expendable launch vehicle.
[Preliminary application of scripting in RayStation TPS system].
Zhang, Jianying; Sun, Jing; Wang, Yun
2013-07-01
Discussing the basic application of scripting in RayStation TPS system. On the RayStation 3.0 Platform, the programming methods and the points should be considered during basic scripting application were explored with the help of utility scripts. The typical planning problems in the field of beam arrangement and plan outputting were used as examples by ironprthon language. The necessary properties and the functions of patient object for script writing can be extracted from RayStation system. With the help of NET controls, planning functions such as the interactive parameter input, treatment planning control and the extract of the plan have been realized by scripts. With the help of demo scripts, scripts can be developed in RayStation, as well as the system performance can be upgraded.
1989-01-01
Mid * Advanced Propulsion System Far * Rotor Burst Protection Reports Mid 11.4 Flight Safety / * Aircraft Icing Handbook Near Atmospheric Hazards...with operating the national aviation system include air traffic controllers, flight service specialists, maintenance technicians, safety inspectors...address the design and certification of flight deck systems and revised crew training requirements. In FY 1988, studies of safety data were initiated to
Operational Focused Simulation
2009-12-01
selected technologies. In order to build the scenario to fit the vignette, the Theater Battle Management Core System ( TBMCS ) databases were adjusted... TBMCS program provided an automated and integrated capability to plan and execute the air battle plan for the modeling and simulation efforts. TBMCS ...is the operational system of record for the Air and Space Operations Center Weapons System (AOC WS). TBMCS provides the Joint/Combined Forces Air
NASA Technical Reports Server (NTRS)
1980-01-01
Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.
Artificial intelligence techniques for scheduling Space Shuttle missions
NASA Technical Reports Server (NTRS)
Henke, Andrea L.; Stottler, Richard H.
1994-01-01
Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.
Joint Exercise Program: DOD Needs to Take Steps to Improve the Quality of Funding Data
2017-02-01
technology systems—the Joint Training Information Management System (JTIMS) and the Execution Management System—to manage the execution of the Joint...Exercise Program, but does not have assurance that funding execution data in the Execution Management System are reliable. JTIMS is the system of record...for the Joint Exercise Program that combatant commanders use to plan and manage their joint training exercises. GAO observed significant variation
Status and plans for the ANOPP/HSR prediction system
NASA Technical Reports Server (NTRS)
Nolan, Sandra K.
1992-01-01
ANOPP is a comprehensive prediction system which was developed and validated by NASA. Because ANOPP is a system prediction program, it allows aerospace industry researchers to create trade-off studies with a variety of aircraft noise problems. The extensive validation of ANOPP allows the program results to be used as a benchmark for testing other prediction codes.
NASA Astrophysics Data System (ADS)
1980-07-01
Accomplishments are reported in the areas of: program management, system integration, the beam characterization system, receiver unit, thermal storage subsystems, master control system, plant support subsystem and engineering services. A solar facilities design integration program action items update is included. Work plan changes and cost underruns are discussed briefly. (LEW)
International Space Station Payload Operations Integration Center (POIC) Overview
NASA Technical Reports Server (NTRS)
Ijames, Gayleen N.
2012-01-01
Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).
Decision Support Systems for Research and Management in Advanced Life Support
NASA Technical Reports Server (NTRS)
Rodriquez, Luis F.
2004-01-01
Decision support systems have been implemented in many applications including strategic planning for battlefield scenarios, corporate decision making for business planning, production planning and control systems, and recommendation generators like those on Amazon.com(Registered TradeMark). Such tools are reviewed for developing a similar tool for NASA's ALS Program. DSS are considered concurrently with the development of the OPIS system, a database designed for chronicling of research and development in ALS. By utilizing the OPIS database, it is anticipated that decision support can be provided to increase the quality of decisions by ALS managers and researchers.
Treatment Planning and Image Guidance for Radiofrequency Ablations of Large Tumors
Ren, Hongliang; Campos-Nanez, Enrique; Yaniv, Ziv; Banovac, Filip; Abeledo, Hernan; Hata, Nobuhiko; Cleary, Kevin
2014-01-01
This article addresses the two key challenges in computer-assisted percutaneous tumor ablation: planning multiple overlapping ablations for large tumors while avoiding critical structures, and executing the prescribed plan. Towards semi-automatic treatment planning for image-guided surgical interventions, we develop a systematic approach to the needle-based ablation placement task, ranging from pre-operative planning algorithms to an intra-operative execution platform. The planning system incorporates clinical constraints on ablations and trajectories using a multiple objective optimization formulation, which consists of optimal path selection and ablation coverage optimization based on integer programming. The system implementation is presented and validated in phantom studies and on an animal model. The presented system can potentially be further extended for other ablation techniques such as cryotherapy. PMID:24235279
Emergency Preparedness and Response Systems
2006-09-01
over time. Preparedness plans include program initiatives for planning, training, equipping, exercising, and evaluating capability to ensure sustainable ... performance in order to prevent, prepare for and respond to incidents. 4. Response Response refers to the activities necessary to address the
Code of Federal Regulations, 2010 CFR
2010-07-01
... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.1 Scope. This part... mining operations and reclamation plans portions of applications for permits for underground mining...
South Florida freight advanced traveler information system.
DOT National Transportation Integrated Search
2013-10-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the South Florida FRATIS Demonstration Project. More specifically, this document provides: Plan...
30 CFR 250.1617 - Application for permit to drill.
Code of Federal Regulations, 2010 CFR
2010-07-01
... BOP equipment, (ii) A schematic drawing of the diverter system to be used (plan and elevation views... survey program for directionally drilled wells; (9) An H2S Contingency Plan, if applicable, and if not...
45 CFR 1306.35 - Family child care program option.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must have systems for assuring the safety of any child not within view for any period (e.g. the... develop contingency plans for emergencies. Such plans may include, but are not limited to, the use of...
Integrating telemedicine and telehealth: putting it all together.
Weinstein, Ronald S; Lopez, Ana Maria; Krupinski, Elizabeth A; Beinar, Sandra J; Holcomb, Michael; McNeely, Richard A; Latifi, Rifat; Barker, Gail
2008-01-01
Telemedicine and telehealth programs are inherently complex compared with their traditional on-site health care delivery counterparts. Relatively few organizations have developed sustainable, multi-specialty telemedicine programs, although single service programs, such as teleradiology and telepsychiatry programs, are common. A number of factors are barriers to the development of sustainable telemedicine and telehealth programs. First, starting programs is often challenging since relatively few organizations have, in house, a critical mass of individuals with the skill sets required to organize and manage a telemedicine program. Therefore, it is necessary to "boot strap" many of the start-up activities using available personnel. Another challenge is to assemble a management team that has time to champion telemedicine and telehealth while dealing with the broad range of issues that often confront telemedicine programs. Telemedicine programs housed within a single health care delivery system have advantages over programs that serve as umbrella telehealth organizations for multiple health care systems. Planning a telemedicine program can involve developing a shared vision among the participants, including the parent organizations, management, customers and the public. Developing shared visions can be a time-consuming, iterative process. Part of planning includes having the partnering organizations and their management teams reach a consensus on the initial program goals, priorities, strategies, and implementation plans. Staffing requirements of telemedicine and telehealth programs may be met by sharing existent resources, hiring additional personnel, or outsourcing activities. Business models, such as the Application Service Provider (ASP) model used by the Arizona Telemedicine Program, are designed to provide staffing flexibility by offering a combination of in-house and out-sourced services, depending on the needs of the individual participating health care organizations. Telemedicine programs should perform ongoing assessments of activities, ranging from service usage to quality of service assessments, to ongoing analyses of financial performance. The financial assessments should include evaluations of costs and benefits, coding issues, reimbursement, account receivables, bad debt and network utilization. Long-range strategic planning for a telemedicine and telehealth program should be carried out on an on-going basis and should include the program's governing board. This planning process should include goal setting and the periodic updating of the program's vision and mission statements. There can be additional special issues for multi-organization telemedicine and telehealth programs. For example, authority management can require the use of innovative approaches tailored to the realities of the organizational structures of the participating members. Inter-institutional relations may introduce additional issues when competing health care organizations are utilizing shared resources. Branding issues are preferably addressed during the initial planning of a multi-organizational telemedicine and telehealth program. Ideally, public policy regarding telemedicine and telehealth within a service region will complement the objectives of telemedicine and telehealth programs within that service area.
Cost analysis of water recovery systems
NASA Technical Reports Server (NTRS)
Yakut, M. M.
1972-01-01
Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced life support subsystems for long range planning in support of earth orbital programs. Cost analysis are presented for five leading water reclamation systems; (1) RITE waste management-water system;(2) reverse osmosis system;(3) multifiltration system;(4) vapor compression system; and(5) closed air evaporation system with electrolytic pretreatment.
Cargo launch vehicles to low earth orbit
NASA Technical Reports Server (NTRS)
Austin, Robert E.
1990-01-01
There are two primary space transportation capabilities required to support both base programs and expanded mission requirements: earth-to-orbit (ETO) transportation systems and space transfer vehicle systems. Existing and new ETO vehicles required to support mission requirements, and planned robotic missions, along with currently planned ETO vehicles are provided. Lunar outposts, Mars' outposts, base and expanded model, ETO vehicles, advanced avionics technologies, expert systems, network architecture and operations systems, and technology transfer are discussed.
State involvement in and use of LANDSAT technology
NASA Technical Reports Server (NTRS)
Tessar, P. A.
1981-01-01
The background of state involvement in LANDSAT systems planning and the status of state LANDSAT use are reviewed. Major recommendations on data continuity; frequency and pattern of observation; state representation in program management; pointable sensors for a fully operational system; data processing systems; data pricing; data copyright; data archival; and technology transfer are highlighted. Plans of the government regarding the LANDSAT system are reflected in the FY-1982 budget process are examined.