Sample records for system requirements study

  1. Space shuttle environmental and thermal control/life support system study

    NASA Technical Reports Server (NTRS)

    Rousseau, J.

    1973-01-01

    The study of the space shuttle environmental and thermal control/life support system is summarized. Design approaches, system descriptions, maintenance requirements, testing requirements, instrumentation, and ground support equipment requirements are discussed.

  2. Exploration Planetary Surface Structural Systems: Design Requirements and Compliance

    NASA Technical Reports Server (NTRS)

    Dorsey, John T.

    2011-01-01

    The Lunar Surface Systems Project developed system concepts that would be necessary to establish and maintain a permanent human presence on the Lunar surface. A variety of specific system implementations were generated as a part of the scenarios, some level of system definition was completed, and masses estimated for each system. Because the architecture studies generally spawned a large number of system concepts and the studies were executed in a short amount of time, the resulting system definitions had very low design fidelity. This paper describes the development sequence required to field a particular structural system: 1) Define Requirements, 2) Develop the Design and 3) Demonstrate Compliance of the Design to all Requirements. This paper also outlines and describes in detail the information and data that are required to establish structural design requirements and outlines the information that would comprise a planetary surface system Structures Requirements document.

  3. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix C: EOS program requirements document

    NASA Technical Reports Server (NTRS)

    1974-01-01

    An analysis of the requirements for the Earth Observatory Satellite (EOS) system specifications is presented. The analysis consists of requirements obtained from existing documentation and those derived from functional analysis. The requirements follow the hierarchy of program, mission, system, and subsystem. The code for designating specific requirements is explained. Among the subjects considered are the following: (1) the traffic model, (2) space shuttle related performance, (3) booster related performance, (4) the data collection system, (5) spacecraft structural tests, and (6) the ground support requirements.

  4. Mars power system concept definition study. Volume 1: Study results

    NASA Technical Reports Server (NTRS)

    Littman, Franklin D.

    1994-01-01

    A preliminary top level study was completed to define power system concepts applicable to Mars surface applications. This effort included definition of power system requirements and selection of power systems with the potential for high commonality. These power systems included dynamic isotope, Proton Exchange Membrane (PEM) regenerative fuel cell, sodium sulfur battery, photovoltaic, and reactor concepts. Design influencing factors were identified. Characterization studies were then done for each concept to determine system performance, size/volume, and mass. Operations studies were done to determine emplacement/deployment maintenance/servicing, and startup/shutdown requirements. Technology development roadmaps were written for each candidate power system (included in Volume 2). Example power system architectures were defined and compared on a mass basis. The dynamic isotope power system and nuclear reactor power system architectures had significantly lower total masses than the photovoltaic system architectures. Integrated development and deployment time phasing plans were completed for an example DIPS and reactor architecture option to determine the development strategies required to meet the mission scenario requirements.

  5. System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results. Appendix D: Life sciences research facility requirements

    NASA Technical Reports Server (NTRS)

    Wiley, Lowell F.

    1985-01-01

    The purpose of this requirements document is to develop the foundation for concept development for the Life Sciences Research Facility (LSRF) on the Space Station. These requirements are developed from the perspective of a Space Station laboratory module outfitter. Science and mission requirements including those related to specimens are set forth. System requirements, including those for support, are detailed. Functional and design requirements are covered in the areas of structures, mechanisms, electrical power, thermal systems, data management system, life support, and habitability. Finally, interface requirements for the Command Module and Logistics Module are described.

  6. Future Spacelift Requirements Study

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This study addresses future space applications and the derived requirements these potential applications will have on future spacelift systems. This NASA sponsored activity is a comprehensive study of potential missions including those of the military, civil, and commercial users. The study objectively evaluated the key architectural requirements for future launch systems. The results of this study are technical, economic, and policy analyses of future spacelift systems. It is intended to assist NASA and DOD decision-makers in planning technical investments and establishing policy for future U.S. spacelift systems.

  7. Advanced EVA system design requirements study: EVAS/space station system interface requirements

    NASA Technical Reports Server (NTRS)

    Woods, T. G.

    1985-01-01

    The definition of the Extravehicular Activity (EVA) systems interface requirements and accomodations for effective integration of a production EVA capability into the space station are contained. A description of the EVA systems for which the space station must provide the various interfaces and accomodations are provided. The discussion and analyses of the various space station areas in which the EVA interfaces are required and/or from which implications for EVA system design requirements are derived, are included. The rationale is provided for all EVAS mechanical, fluid, electrical, communications, and data system interfaces as well as exterior and interior requirements necessary to facilitate EVA operations. Results of the studies supporting these discussions are presented in the appendix.

  8. Space Station data system analysis/architecture study. Task 1: Functional requirements definition, DR-5

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The initial task in the Space Station Data System (SSDS) Analysis/Architecture Study is the definition of the functional and key performance requirements for the SSDS. The SSDS is the set of hardware and software, both on the ground and in space, that provides the basic data management services for Space Station customers and systems. The primary purpose of the requirements development activity was to provide a coordinated, documented requirements set as a basis for the system definition of the SSDS and for other subsequent study activities. These requirements should also prove useful to other Space Station activities in that they provide an indication of the scope of the information services and systems that will be needed in the Space Station program. The major results of the requirements development task are as follows: (1) identification of a conceptual topology and architecture for the end-to-end Space Station Information Systems (SSIS); (2) development of a complete set of functional requirements and design drivers for the SSIS; (3) development of functional requirements and key performance requirements for the Space Station Data System (SSDS); and (4) definition of an operating concept for the SSIS. The operating concept was developed both from a Space Station payload customer and operator perspective in order to allow a requirements practicality assessment.

  9. An example of requirements for Advanced Subsonic Civil Transport (ASCT) flight control system using structured techniques

    NASA Technical Reports Server (NTRS)

    Mclees, Robert E.; Cohen, Gerald C.

    1991-01-01

    The requirements are presented for an Advanced Subsonic Civil Transport (ASCT) flight control system generated using structured techniques. The requirements definition starts from initially performing a mission analysis to identify the high level control system requirements and functions necessary to satisfy the mission flight. The result of the study is an example set of control system requirements partially represented using a derivative of Yourdon's structured techniques. Also provided is a research focus for studying structured design methodologies and in particular design-for-validation philosophies.

  10. Onboard Inert Gas Generation System/Onboard Oxygen Gas Generation System (OBIGGS/OBOGS) Study. Part 1; Aircraft System Requirements

    NASA Technical Reports Server (NTRS)

    Reynolds, Thomas L.; Bailey, Delbert B.; Lewinski, Daniel F.; Roseburg, Conrad M.; Palaszewski, Bryan (Technical Monitor)

    2001-01-01

    The purpose of this technology assessment is to define a multiphase research study program investigating Onboard Inert Gas Generation Systems (OBIGGS) and Onboard Oxygen Generation Systems (OBOGS) that would identify current airplane systems design and certification requirements (Subtask 1); explore state-of-the-art technology (Subtask 2); develop systems specifications (Subtask 3); and develop an initial system design (Subtask 4). If feasible, consideration may be given to the development of a prototype laboratory test system that could potentially be used in commercial transport aircraft (Subtask 5). These systems should be capable of providing inert nitrogen gas for improved fire cargo compartment fire suppression and fuel tank inerting and emergency oxygen for crew and passenger use. Subtask I of this research study, presented herein, defines current production aircraft certification requirements and design objectives necessary to meet mandatory FAA certification requirements and Boeing design and performance specifications. These requirements will be utilized for baseline comparisons for subsequent OBIGGS/OBOGS application evaluations and assessments.

  11. Advanced EVA system design requirements study, executive summary

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Design requirements and criteria for the space station advanced Extravehicular Activity System (EVAS) including crew enclosures, portable life support systems, maneuvering propulsion systems, and related EVA support equipment were established. The EVA mission requirements, environments, and medical and physiological requirements, as well as operational, procedures and training issues were considered.

  12. A study of an orbital radar mapping mission to Venus. Volume 3: Parametric studies and subsystem comparisons

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Parametric studies and subsystem comparisons for the orbital radar mapping mission to planet Venus are presented. Launch vehicle requirements and primary orbiter propulsion system requirements are evaluated. The systems parametric analysis indicated that orbit size and orientation interrelated with almost all of the principal spacecraft systems and influenced significantly the definition of orbit insertion propulsion requirements, weight in orbit capability, radar system design, and mapping strategy.

  13. Transforming user needs into functional requirements for an antibiotic clinical decision support system: explicating content analysis for system design.

    PubMed

    Bright, T J

    2013-01-01

    Many informatics studies use content analysis to generate functional requirements for system development. Explication of this translational process from qualitative data to functional requirements can strengthen the understanding and scientific rigor when applying content analysis in informatics studies. To describe a user-centered approach transforming emergent themes derived from focus group data into functional requirements for informatics solutions and to illustrate these methods to the development of an antibiotic clinical decision support system (CDS). THE APPROACH CONSISTED OF FIVE STEPS: 1) identify unmet therapeutic planning information needs via Focus Group Study-I, 2) develop a coding framework of therapeutic planning themes to refine the domain scope to antibiotic therapeutic planning, 3) identify functional requirements of an antibiotic CDS system via Focus Group Study-II, 4) discover informatics solutions and functional requirements from coded data, and 5) determine the types of information needed to support the antibiotic CDS system and link with the identified informatics solutions and functional requirements. The coding framework for Focus Group Study-I revealed unmet therapeutic planning needs. Twelve subthemes emerged and were clustered into four themes; analysis indicated a need for an antibiotic CDS intervention. Focus Group Study-II included five types of information needs. Comments from the Barrier/Challenge to information access and Function/Feature themes produced three informatics solutions and 13 functional requirements of an antibiotic CDS system. Comments from the Patient, Institution, and Domain themes generated required data elements for each informatics solution. This study presents one example explicating content analysis of focus group data and the analysis process to functional requirements from narrative data. Illustration of this 5-step method was used to develop an antibiotic CDS system, resolving unmet antibiotic prescribing needs. As a reusable approach, these techniques can be refined and applied to resolve unmet information needs with informatics interventions in additional domains.

  14. Large Deployable Reflector (LDR) feasibility study update

    NASA Technical Reports Server (NTRS)

    Alff, W. H.; Banderman, L. W.

    1983-01-01

    In 1982 a workshop was held to refine the science rationale for large deployable reflectors (LDR) and develop technology requirements that support the science rationale. At the end of the workshop, a set of LDR consensus systems requirements was established. The subject study was undertaken to update the initial LDR study using the new systems requirements. The study included mirror materials selection and configuration, thermal analysis, structural concept definition and analysis, dynamic control analysis and recommendations for further study. The primary emphasis was on the dynamic controls requirements and the sophistication of the controls system needed to meet LDR performance goals.

  15. Advanced EVA system design requirements study

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Design requirements and criteria for the Space Station Advanced Extravehicular Activity System (EVAS) including crew enclosures, portable life support systems, maneuvering propulsion systems, and related extravehicular activity (EVA) support equipment were defined and established. The EVA mission requirements, environments, and medical and physiological requirements, as well as opertional, procedures, and training issues were considered.

  16. Satellite Power Systems (SPS) concept definition study. Volume 2: SPS system requirements

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Collected data reflected the level of definition resulting from the evaluation of a broad spectrum of SPS (satellite power systems) concepts. As the various concepts matured, these requirements were updated to reflect the requirements identified for the projected satellite system/subsystem point design(s). The study established several candidate concepts which were presented to provide a basis for the selection of one or two approaches that would be given a more comprehensive examination. The two selected concepts were expanded and constitute the selected system point designs. The identified system/subsystem requirements was emphasized and information on the selected point design was provided.

  17. Nursing Information Systems Requirements: A Milestone for Patient Outcome and Patient Safety Improvement.

    PubMed

    Farzandipour, Mehrdad; Meidani, Zahra; Riazi, Hossein; Sadeqi Jabali, Monireh

    2016-12-01

    Considering the integral role of understanding users' requirements in information system success, this research aimed to determine functional requirements of nursing information systems through a national survey. Delphi technique method was applied to conduct this study through three phases: focus group method modified Delphi technique and classic Delphi technique. A cross-sectional study was conducted to evaluate the proposed requirements within 15 general hospitals in Iran. Forty-three of 76 approved requirements were clinical, and 33 were administrative ones. Nurses' mean agreements for clinical requirements were higher than those of administrative requirements; minimum and maximum means of clinical requirements were 3.3 and 3.88, respectively. Minimum and maximum means of administrative requirements were 3.1 and 3.47, respectively. Research findings indicated that those information system requirements that support nurses in doing tasks including direct care, medicine prescription, patient treatment management, and patient safety have been the target of special attention. As nurses' requirements deal directly with patient outcome and patient safety, nursing information systems requirements should not only address automation but also nurses' tasks and work processes based on work analysis.

  18. Transforming User Needs into Functional Requirements for an Antibiotic Clinical Decision Support System

    PubMed Central

    Bright, T.J.

    2013-01-01

    Summary Background Many informatics studies use content analysis to generate functional requirements for system development. Explication of this translational process from qualitative data to functional requirements can strengthen the understanding and scientific rigor when applying content analysis in informatics studies. Objective To describe a user-centered approach transforming emergent themes derived from focus group data into functional requirements for informatics solutions and to illustrate these methods to the development of an antibiotic clinical decision support system (CDS). Methods The approach consisted of five steps: 1) identify unmet therapeutic planning information needs via Focus Group Study-I, 2) develop a coding framework of therapeutic planning themes to refine the domain scope to antibiotic therapeutic planning, 3) identify functional requirements of an antibiotic CDS system via Focus Group Study-II, 4) discover informatics solutions and functional requirements from coded data, and 5) determine the types of information needed to support the antibiotic CDS system and link with the identified informatics solutions and functional requirements. Results The coding framework for Focus Group Study-I revealed unmet therapeutic planning needs. Twelve subthemes emerged and were clustered into four themes; analysis indicated a need for an antibiotic CDS intervention. Focus Group Study-II included five types of information needs. Comments from the Barrier/Challenge to information access and Function/Feature themes produced three informatics solutions and 13 functional requirements of an antibiotic CDS system. Comments from the Patient, Institution, and Domain themes generated required data elements for each informatics solution. Conclusion This study presents one example explicating content analysis of focus group data and the analysis process to functional requirements from narrative data. Illustration of this 5-step method was used to develop an antibiotic CDS system, resolving unmet antibiotic prescribing needs. As a reusable approach, these techniques can be refined and applied to resolve unmet information needs with informatics interventions in additional domains. PMID:24454586

  19. Systems planning for automated commercial vehicle licensing and permitting systems : national ITS/CVO program requirements

    DOT National Transportation Integrated Search

    1997-07-01

    This report describes the work of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study is to define the market, organization, and resource requirements for a national program...

  20. Framework for Architecture Trade Study Using MBSE and Performance Simulation

    NASA Technical Reports Server (NTRS)

    Ryan, Jessica; Sarkani, Shahram; Mazzuchim, Thomas

    2012-01-01

    Increasing complexity in modern systems as well as cost and schedule constraints require a new paradigm of system engineering to fulfill stakeholder needs. Challenges facing efficient trade studies include poor tool interoperability, lack of simulation coordination (design parameters) and requirements flowdown. A recent trend toward Model Based System Engineering (MBSE) includes flexible architecture definition, program documentation, requirements traceability and system engineering reuse. As a new domain MBSE still lacks governing standards and commonly accepted frameworks. This paper proposes a framework for efficient architecture definition using MBSE in conjunction with Domain Specific simulation to evaluate trade studies. A general framework is provided followed with a specific example including a method for designing a trade study, defining candidate architectures, planning simulations to fulfill requirements and finally a weighted decision analysis to optimize system objectives.

  1. Manned orbital systems concepts study. Book 2: Requirements for extended-duration missions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    In order to provide essential data needed in long-range program planning, the Manned Orbital Systems Concepts (MOSC) study attempted to define, evaluate, and compare concepts for manned orbital systems that provide extended experiment mission capabilities in space, flexibility of operation, and growth potential. Specific areas discussed include roles and requirements for man in future space missions, requirements for extended capability, mission/payload concepts, and preliminary design and operational requirements.

  2. National Aeronautics and Space Administration Manned Spacecraft Center data based requirements study

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The results are summarized of a study to determine the requirements of a data management system to meet the needs of MSC in mission planning and program and resource management during the 1975 time frame. The study addresses overall system requirements, implementation considerations, and cost/benefit comparisions.

  3. Live, Model, Learn: Experiencing Information Systems Requirements through Simulation

    ERIC Educational Resources Information Center

    Hartzel, Kathleen S.; Pike, Jacqueline C.

    2015-01-01

    Information system professionals strive to determine requirements by interviewing clients, observing activities at the client's site, and studying existing system documentation. Still this often leads to vague and inaccurate requirements documentation. When teaching the skills needed to determine requirements, it is important to recreate a…

  4. Extravehicular Crewman Work System (ECWS) study program. Volume 2: Construction

    NASA Technical Reports Server (NTRS)

    Wilde, R. C.

    1980-01-01

    The construction portion of the Extravehicular Crewman Work System Study defines the requirements and selects the concepts for the crewman work system required to support the construction of large structures in space.

  5. Design requirements for SRB production control system. Volume 1: Study background and overview

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The solid rocket boosters assembly environment is described in terms of the contraints it places upon an automated production control system. The business system generated for the SRB assembly and the computer system which meets the business system requirements are described. The selection software process and modifications required to the recommended software are addressed as well as the hardware and configuration requirements necessary to support the system.

  6. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 10. Subsystem Performance Requirements.

    DOT National Transportation Integrated Search

    1974-02-01

    The volume presents the results of the subsystem performance requirements study for an Advanced Air Traffic Management System (AATMS). The study determined surveillance and navigation subsystem requirements for terminal and enroute area operations. I...

  7. Satellite Power Systems (SPS) concept definition study, exhibit C. Volume 7: System/subsystem requirements data book

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1979-01-01

    Volume 7 of the Satellite Power Systems (SPS) Concept Definition Study final report summarizes the basic requirements used as a guide to systems analysis and is a basis for the selection of candidate SPS point design(s). Initially, these collected data reflected the level of definition resulting from the evaluation of a broad spectrum of SPS concepts. As the various concepts matured these requirements were updated to reflect the requirements identified for the projected satellite system/subsystem point design(s). The identified subsystem/systems requirements are defined, and where appropriate, recommendations for alternate approaches which may represent improved design features are presented. A more detailed discussion of the selected point design(s) will be found in Volume 2 of this report.

  8. Investigation of the current requirements engineering practices among software developers at the Universiti Utara Malaysia Information Technology (UUMIT) centre

    NASA Astrophysics Data System (ADS)

    Hussain, Azham; Mkpojiogu, Emmanuel O. C.; Abdullah, Inam

    2016-08-01

    Requirements Engineering (RE) is a systemic and integrated process of eliciting, elaborating, negotiating, validating and managing of the requirements of a system in a software development project. UUM has been supported by various systems developed and maintained by the UUM Information Technology (UUMIT) Centre. The aim of this study was to assess the current requirements engineering practices at UUMIT. The main problem that prompted this research is the lack of studies that support software development activities at the UUMIT. The study is geared at helping UUMIT produce quality but time and cost saving software products by implementing cutting edge and state of the art requirements engineering practices. Also, the study contributes to UUM by identifying the activities needed for software development so that the management will be able to allocate budget to provide adequate and precise training for the software developers. Three variables were investigated: Requirement Description, Requirements Development (comprising: Requirements Elicitation, Requirements Analysis and Negotiation, Requirements Validation), and Requirement Management. The results from the study showed that the current practice of requirement engineering in UUMIT is encouraging, but still need further development and improvement because a few RE practices were seldom practiced.

  9. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 4: Design of the IPAD system. Part 1: IPAD system design requirements, phase 1, task 2

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.

    1973-01-01

    System requirements, software elements, and hardware equipment required for an IPAD system are defined. An IPAD conceptual design was evolved, a potential user survey was conducted, and work loads for various types of interactive terminals were projected. Various features of major host computing systems were compared, and target systems were selected in order to identify the various elements of software required.

  10. SysML: A Language for Space System Engineering

    NASA Astrophysics Data System (ADS)

    Mazzini, S.; Strangapede, A.

    2008-08-01

    This paper presents the results of an ESA/ESTEC internal study, performed with the support of INTECS, about modeling languages to support Space System Engineering activities and processes, with special emphasis on system requirements identification and analysis. The study was focused on the assessment of dedicated UML profiles, their positioning alongside the system and software life cycles and associated methodologies. Requirements for a Space System Requirements Language were identified considering the ECSS-E-10 and ECSS-E_40 processes. The study has identified SysML as a very promising language, having as theoretical background the reference system processes defined by the ISO15288, as well as industrial practices.

  11. Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Appendix G: LRB for the STS system study level 2 requirements, revision 1

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Requirements are presented for shuttle system definition; performance and design characteristics; shuttle vehicle end item performance and design characteristics; ground operations complex performance and design characteristics; operability and system design and construction standards; and quality control.

  12. Advanced technology requirements for large space structures. Part 5: Atlas program requirements

    NASA Technical Reports Server (NTRS)

    Katz, E.; Lillenas, A. N.; Broddy, J. A.

    1977-01-01

    The results of a special study which identifies and assigns priorities to technology requirements needed to accomplish a particular scenario of future large area space systems are described. Proposed future systems analyzed for technology requirements included large Electronic Mail, Microwave Radiometer, and Radar Surveillance Satellites. Twenty technology areas were identified as requirements to develop the proposed space systems.

  13. Space Station Freedom extravehicular activity systems evolution study

    NASA Technical Reports Server (NTRS)

    Rouen, Michael

    1990-01-01

    Evaluation of Space Station Freedom (SSF) support of manned exploration is in progress to identify SSF extravehicular activity (EVA) system evolution requirements and capabilities. The output from these studies will provide data to support the preliminary design process to ensure that Space Station EVA system requirements for future missions (including the transportation node) are adequately considered and reflected in the baseline design. The study considers SSF support of future missions and the EVA system baseline to determine adequacy of EVA requirements and capabilities and to identify additional requirements, capabilities, and necessary technology upgrades. The EVA demands levied by formal requirements and indicated by evolutionary mission scenarios are high for the out-years of Space Station Freedom. An EVA system designed to meet the baseline requirements can easily evolve to meet evolution demands with few exceptions. Results to date indicate that upgrades or modifications to the EVA system may be necessary to meet the full range of EVA thermal environments associated with the transportation node. Work continues to quantify the EVA capability in this regard. Evolution mission scenarios with EVA and ground unshielded nuclear propulsion engines are inconsistent with anthropomorphic EVA capabilities.

  14. Satellite services system analysis study: Propellant transfer system

    NASA Technical Reports Server (NTRS)

    1982-01-01

    General servicing requirements, a servicing mission concept and scenario, overall servicing needs, basic servicing equipment, and a general servicing mission configuration layout are addressed. Servicing needs, equipment concepts, system requirements equipment specifications, preliminary designs, and resource requirements for flight hardware for the propellant transfer system are also addressed.

  15. Improved Orbiter Waste Collection System Study, Appendix D

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Basic requirements for a space shuttle orbiter waste collection system are established. They are intended to be an aid in the development and procurement of a representative flight test article. Orbiter interface requirements, performance requirements, flight crew operational requirements, flight environmental requirements, and ground operational and environmental requirements are considered.

  16. Development of vendor evaluation criteria and post-implementation considerations for MSFC center-wide executive information system

    NASA Technical Reports Server (NTRS)

    Moynihan, Gary P.

    1992-01-01

    In June 1991, the MITRE Corporation submitted a series of recommendations as part of a Marshall Space Flight Center (MSFC) Management Information System Requirements Study, initiated by the Information Systems Office (ISO). A major recommendation of the study was to develop an Executive Information System (EIS) for MSFC executives. ISO was directed, by center management, to proceed with the development of a Center-Wide Executive Information System. Existing EIS prototypes, developed by the Space Shuttle Projects Office and the Payload Projects Office, were reviewed. These existing MSFC prototypes were considered not to encompass the required functionality needed on a center-wide basis. A follow-up study by MITRE provided top-level system requirements. These were later incorporated into a final requirements specification document by Boeing Computer Support Services.

  17. Carbon Dioxide Observational Platform System (CO-OPS), feasibility study

    NASA Technical Reports Server (NTRS)

    Bouquet, D. L.; Hall, D. W.; Mcelveen, R. P.

    1987-01-01

    The Carbon Dioxide Observational Platform System (CO-OPS) is a near-space, geostationary, multi-user, unmanned microwave powered monitoring platform system. This systems engineering feasibility study addressed identified existing requirements such as: carbon dioxide observational data requirements, communications requirements, and eye-in-the-sky requirements of other groups like the Defense Department, the Forestry Service, and the Coast Guard. In addition, potential applications in: earth system science, space system sciences, and test and verification (satellite sensors and data management techniques) were considered. The eleven month effort is summarized. Past work and methods of gathering the required observational data were assessed and rough-order-of magnitude cost estimates have shown the CO-OPS system to be most cost effective (less than $30 million within a 10 year lifetime). It was also concluded that there are no technical, schedule, or obstacles that would prevent achieving the objectives of the total 5-year CO-OPS program.

  18. Strategic avionics technology definition studies. Subtask 3-1A: Electrical Actuation (ELA) systems

    NASA Technical Reports Server (NTRS)

    Pond, Charles L.; Mcdermott, William A.; Lum, Ben T. F.

    1993-01-01

    Electrical actuator (ELA) power efficiency and requirements are examined for space system application. Requirements for Space Shuttle effector systems are presented, along with preliminary ELA trades and selection to form a preliminary ELA system baseline. Power and energy requirements for this baseline ELA system are applicable to the Space Shuttle and similar space vehicles.

  19. Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A

    NASA Technical Reports Server (NTRS)

    Woodcock, G. R.

    1982-01-01

    The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.

  20. FBI fingerprint identification automation study: AIDS 3 evaluation report. Volume 9: Functional requirements

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The current system and subsystem used by the Identification Division are described. System constraints that dictate the system environment are discussed and boundaries within which solutions must be found are described. The functional requirements were related to the performance requirements. These performance requirements were then related to their applicable subsystems. The flow of data, documents, or other pieces of information from one subsystem to another or from the external world into the identification system is described. Requirements and design standards for a computer based system are presented.

  1. NASA's Human Rating Requirements - A Historical Interpretive Perspective

    NASA Technical Reports Server (NTRS)

    Langford, Gerald; White, Juli Kramer

    2011-01-01

    Section 3.0 of NASA's Human Rating Requirements for Space Systems, NPR 8705.2, represents technical engineering requirements that the Agenc y requires of Human Space Systems. In many cases the requirements are not unlike requirements for any space system, crewed or uncrewed, th ey deal with successfully accomplishing the mission objectives. Howev er, they go one step further and have requirements that go beyond suc cessful completion of the mission and dictate functions or actions ne cessary to assure the survival of the crew. In that regard they are u nique from other space system requirements. Even with their uniquenes s the technical requirements of the NPR 8705.2 have been relatively u nchanged in overall intent over the revisions. They all have provided for system redundancy, crew habitable environment, crew situational awareness, crew operation, system control, emergency egress and abort systems. In a few cases the intent of the requirement was changed in tentionally, either to restrict certain types of systems or their fun ctions, or to encompass lessons learned from previous programs. For t he most part the requirements are non controversial and represent the current best practices for human space systems, however, a few requi rements are always debated and have evolved over revisions of the NPR due to studies conducted with various programs like the Orbital Spac e Plane and the Constellation Programs. Those requirements will be di scussed using results of trade studies conducted during past programs highlighting how these particular requirements have evolved through the revisions of the NPR. Comments will also be provided for requirem ents that although not debated, have provided challenges in interpret ation.

  2. Space shuttle/food system study. Volume 2, appendix E: Alternate flight systems analysis

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The functional requirements of stowage, preparation, serving, consumption, and cleanup were applied to each of the five food mixes selected for study in terms of the overall design of the space shuttle food system. The analysis led to a definition of performance requirements for each food mix, along with a definition of equipment to meet those requirements. Weight and volume data for all five systems, in terms of food and packaging, support equipment, and galley installation penalties, are presented.

  3. EOS image data processing system definition study

    NASA Technical Reports Server (NTRS)

    Gilbert, J.; Honikman, T.; Mcmahon, E.; Miller, E.; Pietrzak, L.; Yorsz, W.

    1973-01-01

    The Image Processing System (IPS) requirements and configuration are defined for NASA-sponsored advanced technology Earth Observatory System (EOS). The scope included investigation and definition of IPS operational, functional, and product requirements considering overall system constraints and interfaces (sensor, etc.) The scope also included investigation of the technical feasibility and definition of a point design reflecting system requirements. The design phase required a survey of present and projected technology related to general and special-purpose processors, high-density digital tape recorders, and image recorders.

  4. Ground Systems Development Environment (GSDE) interface requirements analysis

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Philips, John; Hartenstein, Ray; Bassman, Mitchell; Ruskin, Leslie; Perez-Davila, Alfredo

    1991-01-01

    A set of procedural and functional requirements are presented for the interface between software development environments and software integration and test systems used for space station ground systems software. The requirements focus on the need for centralized configuration management of software as it is transitioned from development to formal, target based testing. This concludes the GSDE Interface Requirements study. A summary is presented of findings concerning the interface itself, possible interface and prototyping directions for further study, and results of the investigation of the Cronus distributed applications environment.

  5. Extravehicular Crewman Work System (ECWS) study program. Volume 3: Satellite service

    NASA Technical Reports Server (NTRS)

    Wilde, R. C.

    1980-01-01

    The satellite service portion of the Extravehicular Crewman Work System Study defines requirements and service equipment concepts for performing satellite service from the space shuttle orbiter. Both normal and contingency orbital satellite service is required. Service oriented satellite design practices are required to provide on orbit satellite service capability for the wide variety of satellites at the subsystem level. Development of additional satellite service equipment is required. The existing space transportation system provides a limited capability for performing satellite service tasks in the shuttle payload bay area.

  6. Assessment of the impact of dipped guideways on urban rail transit systems: Ventilation and safety requirements

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The ventilation and fire safety requirements for subway tunnels with dipped profiles between stations as compared to subway tunnels with level profiles were evaluated. This evaluation is based upon computer simulations of a train fire emergency condition. Each of the tunnel configurations evaluated was developed from characteristics that are representative of modern transit systems. The results of the study indicate that: (1) The level tunnel system required about 10% more station cooling than dipped tunnel systems in order to meet design requirements; and (2) The emergency ventilation requirements are greater with dipped tunnel systems than with level tunnel systems.

  7. Engineering study for the functional design of a multiprocessor system

    NASA Technical Reports Server (NTRS)

    Miller, J. S.; Vandever, W. H.; Stanten, S. F.; Avakian, A. E.; Kosmala, A. L.

    1972-01-01

    The results are presented of a study to generate a functional system design of a multiprocessing computer system capable of satisfying the computational requirements of a space station. These data management system requirements were specified to include: (1) real time control, (2) data processing and storage, (3) data retrieval, and (4) remote terminal servicing.

  8. 45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... feasibility of the proposed effort and provide for the conduct of a requirements analysis study which address... indicate how the results of the requirements analysis study will be incorporated into the proposed system... address requirements analysis, program design, procurement and project management; and, a description of...

  9. Shared-Ride Taxi Computer Control System Requirements Study

    DOT National Transportation Integrated Search

    1977-08-01

    The technical problem of scheduling and routing shared-ride taxi service is so great that only computers can handle it efficiently. This study is concerned with defining the requirements of such a computer system. The major objective of this study is...

  10. Advanced extravehicular activity systems requirements definition study

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A study to define the requirements for advanced extravehicular activities (AEVA) was conducted. The purpose of the study was to develop an understanding of the EVA technology requirements and to map a pathway from existing or developing technologies to an AEVA system capable of supporting long-duration missions on the lunar surface. The parameters of an AEVA system which must sustain the crewmembers and permit productive work for long periods in the lunar environment were examined. A design reference mission (DRM) was formulated and used as a tool to develop and analyze the EVA systems technology aspects. Many operational and infrastructure design issues which have a significant influence on the EVA system are identified.

  11. Saint Lawrence Seaway Navigation-Aid System Study : Volume III - Appendix C - User's Manual and Documentation of the Ship Maneuvering Requirements Computer Program

    DOT National Transportation Integrated Search

    1978-09-01

    The requirements for a navigation guidance system which will effect an increase in the ship processing capacity of the Saint Lawrence Seaway (Lake Ontario to Montreal, Quebec) are developed. The requirements include a specification of system position...

  12. 76 FR 18915 - Ethiprole; Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ... homeostasis and the developing nervous system in the young is not available. Based on a battery of... of the nervous system, the Agency is requiring a developmental thyroid toxicity study to assess for... nervous system, the Agency is requiring the developmental thyroid toxicity study in lieu of the DNT. iii...

  13. Parameter Requirements for Description of Alternative LINC Systems. Final Report.

    ERIC Educational Resources Information Center

    Center for Applied Linguistics, Washington, DC. Language Information Network and Clearinghouse System.

    This study was undertaken for the Center for Applied Linguistics to survey and analyze its information system program for the language sciences. The study identifies and defines the generalized sets of parameters required for subsequent quantitative analysis of proposed alternative Language Information Network and Clearinghouse Systems by means of…

  14. A study of satellite emergency locator systems

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Satellite emergency locator systems were studied. The objective of the study was to determine the feasibility and hardware requirements for satellite systems capable of identifying and locating the position emergency locator transmitters and emergency position indicating radio beacons. Both geosynchronous and near-polar-orbiting satellites were considered. One of the most important aspects of the study was to minimize the cost of the hardware required.

  15. Study of guidance techniques for aerial application of agricultural compounds

    NASA Technical Reports Server (NTRS)

    Caldwell, J. D.; Dimmock, P. B. A.; Watkins, R. H.

    1980-01-01

    Candidate systems were identified for evaluation of suitability in meeting specified accuracy requirements for a swath guidance system in an agriculture aircraft. Further examination reduced the list of potential candidates to a single category, i.e., transponder type systems, for detailed evaluation. Within this category three systems were found which met the basic accuracy requirements of the work statement. The Flying Flagman, the Electronic Flagging and the Raydist Director System. In addition to evaluating the systems against the specified requirements, each system was compared with the other two systems on a relative basis. The conclusions supported by the analyses show the Flying Flagman system to be the most suitable system currently available to meet the requirements.

  16. Earth Observatory Satellite system definition study. Report no. 5: System design and specifications. Part 1: Observatory system element specifications

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The performance, design, and quality assurance requirements for the Earth Observatory Satellite (EOS) Observatory and Ground System program elements required to perform the Land Resources Management (LRM) A-type mission are presented. The requirements for the Observatory element with the exception of the instruments specifications are contained in the first part.

  17. Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 2: Concept document

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Simulation Computer System (SCS) concept document describes and establishes requirements for the functional performance of the SCS system, including interface, logistic, and qualification requirements. The SCS is the computational communications and display segment of the Marshall Space Flight Center (MSFC) Payload Training Complex (PTC). The PTC is the MSFC facility that will train onboard and ground operations personnel to operate the payloads and experiments on board the international Space Station Freedom. The requirements to be satisfied by the system implementation are identified here. The SCS concept document defines the requirements to be satisfied through the implementation of the system capability. The information provides the operational basis for defining the requirements to be allocated to the system components and enables the system organization to assess whether or not the completed system complies with the requirements of the system.

  18. Strategic avionics technology definition studies. Subtask 3-1A: Electrical Actuation (ELA) systems

    NASA Technical Reports Server (NTRS)

    Lum, Ben T. F.; Pond, Charles; Dermott, William

    1993-01-01

    This interim report presents the preliminary results of an electrical actuation (ELA) system study (subtask TA3-1A) to support the NASA strategic avionics technology definition studies. The final report of this ELA study is scheduled for September 30, 1993. The topics are presented in viewgraph form and include the following ELA technology demonstration testing; ELA system baseline; power and energy requirements for shuttle effector systems; power efficiency and losses of ELA effector systems; and power and energy requirements for ELA power sources.

  19. STS users study (study 2.2). Volume 2: STS users plan (user data requirements) study

    NASA Technical Reports Server (NTRS)

    Pritchard, E. I.

    1975-01-01

    Pre-flight scheduling and pre-flight requirements of the space transportation system are discussed. Payload safety requirements, shuttle flight manifests, and interface specifications are studied in detail.

  20. Systems simulation for an airport trailing vortex warning system

    NASA Technical Reports Server (NTRS)

    Jeffreys, H. B.

    1972-01-01

    The approach, development, and limited system studies associated with a system simulation for an Airport Trailing Vortex Warning System are documented. The usefulness is shown of a systems engineering approach to the problem of developing a system, as dictated by aircraft vortices, which will increase air-traffic flow in the takeoff/landing corridors of busy airports while maintaining the required safety factor for each operation. The simulation program has been developed in a modular form which permits new, more sophisticated component models, when they become available and are required, to be incorporated into the program with a minimum of program modifications. This report documents a limited system study that has been performed using this Total System Simulation Model. The resulting preliminary system requirements, conclusions, and recommendations are given.

  1. Clustered engine study

    NASA Technical Reports Server (NTRS)

    Shepard, Kyle; Sager, Paul; Kusunoki, Sid; Porter, John; Campion, AL; Mouritzan, Gunnar; Glunt, George; Vegter, George; Koontz, Rob

    1993-01-01

    Several topics are presented in viewgraph form which together encompass the preliminary assessment of nuclear thermal rocket engine clustering. The study objectives, schedule, flow, and groundrules are covered. This is followed by the NASA groundrules mission and our interpretation of the associated operational scenario. The NASA reference vehicle is illustrated, then the four propulsion system options are examined. Each propulsion system's preliminary design, fluid systems, operating characteristics, thrust structure, dimensions, and mass properties are detailed as well as the associated key propulsion system/vehicle interfaces. A brief series of systems analysis is also covered including: thrust vector control requirements, engine out possibilities, propulsion system failure modes, surviving system requirements, and technology requirements. An assessment of vehicle/propulsion system impacts due to the lessons learned are presented.

  2. Satellite orbit considerations for a global change technology architecture trade study

    NASA Technical Reports Server (NTRS)

    Harrison, Edwin F.; Gibson, Gary G.; Suttles, John T.; Buglia, James J.; Taback, Israel

    1991-01-01

    A study was conducted to determine satellite orbits for earth observation missions aimed at obtaining data for assessing data global climate change. A multisatellite system is required to meet the scientific requirements for temporal coverage over the globe. The best system consists of four sun-synchronous satellites equally spaced in local time of equatorial crossing. This system can obtain data every three hours for all regions. Several other satellite systems consisting of combinations of sun-synchronous orbits and either the Space Station Freedom or a mid-altitude equatorial satellite can provide three to six hour temporal coverage, which is sufficient for measuring many of the parameters required for the global change monitoring mission. Geosynchronous satellites are required to study atmospheric and surface processes involving variations on the order of a few minutes to an hour. One or two geosynchronous satellites can be relocated in longitude to study processes over selected regions of earth.

  3. Conceptual design studies of control and instrumentation systems for ignition experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nicholson, P.J.; Dewolf, J.B.; Heinemann, P.C.

    1978-03-01

    Studies at the Charles Stark Draper Laboratory in the past year were a continuation of prior studies of control and instrumentation systems for current and next generation Tokomaks. Specifically, the FY 77 effort has focused on the following two main efforts: (1) control requirements--(a) defining and evolving control requirements/concepts for a prototype experimental power reactor(s), and (b) defining control requirements for diverters and mirror machines, specifically the MX; and (2) defining requirements and scoping design for a functional control simulator. Later in the year, a small additional task was added: (3) providing analysis and design support to INESCO for itsmore » low cost fusion power system, FPC/DMT.« less

  4. An airline study of advanced technology requirements for advanced high speed commercial engines. 3: Propulsion system requirements

    NASA Technical Reports Server (NTRS)

    Sallee, G. P.

    1973-01-01

    The advanced technology requirements for an advanced high speed commercial transport engine are presented. The results of the phase 3 effort cover the requirements and objectives for future aircraft propulsion systems. These requirements reflect the results of the Task 1 and 2 efforts and serve as a baseline for future evaluations, specification development efforts, contract/purchase agreements, and operational plans for future subsonic commercial engines. This report is divided into five major sections: (1) management objectives for commercial propulsion systems, (2) performance requirements for commercial transport propulsion systems, (3) design criteria for future transport engines, (4) design requirements for powerplant packages, and (5) testing.

  5. Space station integrated propulsion and fluid system study: Fluid systems configuration databook

    NASA Technical Reports Server (NTRS)

    Rose, L.; Bicknell, B.; Bergman, D.; Wilson, S.

    1987-01-01

    This databook contains fluid system requirements and system descriptions for Space Station program elements including the United States and International modules, integrated fluid systems, attached payloads, fluid servicers and vehicle accommodation facilities. Separate sections are devoted to each of the program elements and include a discussion of the overall system requirements, specific fluid systems requirements and systems descriptions. The systems descriptions contain configurations, fluid inventory data and component lists. In addition, a list of information sources is referenced at the end of each section.

  6. Payload operations control center network (POCCNET) systems definition phase study report

    NASA Technical Reports Server (NTRS)

    Desjardins, R.

    1978-01-01

    The results of the studies performed during the systems definition phase of POCCNET are presented. The concept of POCCNET as a system of standard POCCs is described and an analysis of system requirements is also included. Alternative systems concepts were evaluated as well as various methods for development of reliable reusable software. A number of POCC application areas, such as command management, on board computer support, and simulation were also studied. Other areas of investigation included the operation of POCCNET systems, the facility requirements and usage.

  7. Airport Surface Traffic Control Concept Formulation Study : Volume 4. Estimation of Requirements

    DOT National Transportation Integrated Search

    1975-07-01

    A detailed study of requirements was performed and is presented. This requirements effort provided an estimate of the performance requirements of a surveillance sensor that would be required in a TAGS (Tower Automated Ground Surveillance) system for ...

  8. Atmospheric cloud physics laboratory project study

    NASA Technical Reports Server (NTRS)

    Schultz, W. E.; Stephen, L. A.; Usher, L. H.

    1976-01-01

    Engineering studies were performed for the Zero-G Cloud Physics Experiment liquid cooling and air pressure control systems. A total of four concepts for the liquid cooling system was evaluated, two of which were found to closely approach the systems requirements. Thermal insulation requirements, system hardware, and control sensor locations were established. The reservoir sizes and initial temperatures were defined as well as system power requirements. In the study of the pressure control system, fluid analyses by the Atmospheric Cloud Physics Laboratory were performed to determine flow characteristics of various orifice sizes, vacuum pump adequacy, and control systems performance. System parameters predicted in these analyses as a function of time include the following for various orifice sizes: (1) chamber and vacuum pump mass flow rates, (2) the number of valve openings or closures, (3) the maximum cloud chamber pressure deviation from the allowable, and (4) cloud chamber and accumulator pressure.

  9. Requirements for company-wide management

    NASA Technical Reports Server (NTRS)

    Southall, J. W.

    1980-01-01

    Computing system requirements were developed for company-wide management of information and computer programs in an engineering data processing environment. The requirements are essential to the successful implementation of a computer-based engineering data management system; they exceed the capabilities provided by the commercially available data base management systems. These requirements were derived from a study entitled The Design Process, which was prepared by design engineers experienced in development of aerospace products.

  10. Space station data system analysis/architecture study. Task 1: Functional requirements definition, DR-5. Appendix: Requirements data base

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Appendix A contains data that characterize the system functions in sufficient depth as to determine the requirements for the Space Station Data System (SSDS). This data is in the form of: (1) top down traceability report; (2) bottom up traceability report; (3) requirements data sheets; and (4) cross index of requirements paragraphs of the source documents and the requirements numbers. A data base users guide is included that interested parties can use to access the requirements data base and get up to date information about the functions.

  11. Conceptual design study for a teleoperator visual system, phase 1

    NASA Technical Reports Server (NTRS)

    Adams, D.; Grant, C.; Johnson, C.; Meirick, R.; Polhemus, C.; Ray, A.; Rittenhouse, D.; Skidmore, R.

    1972-01-01

    Results are reported for work performed during the first phase of the conceptual design study for a teleoperator visual system. This phase consists of four tasks: General requirements, concept development, subsystem requirements and analysis, and concept evaluation.

  12. Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study, volume 2

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Liquid Rocket Booster (LRB) Systems Definition Handbook presents the analyses and design data developed during the study. The Systems Definition Handbook (SDH) contains three major parts: the LRB vehicles definition; the Pressure-Fed Booster Test Bed (PFBTB) study results; and the ALS/LRB study results. Included in this volume are the results of all trade studies; final configurations with supporting rationale and analyses; technology assessments; long lead requirements for facilities, materials, components, and subsystems; operational requirements and scenarios; and safety, reliability, and environmental analyses.

  13. System Concept Study for a Cargo Data Interchange System (CARDIS)

    DOT National Transportation Integrated Search

    1975-04-01

    The report presents the analysis of functional and operational requirements of CARDIS. From these requirements, system sizing estimates are derived. Three potential CARDIS concepts are introduced for consideration in subsequent analysis. Their charac...

  14. A Study on the Deriving Requirements of ARGO Operation System

    NASA Astrophysics Data System (ADS)

    Seo, Yoon-Kyung; Rew, Dong-Young; Lim, Hyung-Chul; Park, In-Kwan; Yim, Hong-Suh; Jo, Jung Hyun; Park, Jong-Uk

    2009-12-01

    Korea Astronomy and Space Science Institute (KASI) has been developing one mobile and one stationary SLR system since 2008 named as ARGO-M and ARGO-F, respectively. KASI finished the step of deriving the system requirements of ARGO. The requirements include definitions and scopes of various software and hardware components which are necessary for developing the ARGO-M operation system. And the requirements define function, performance, and interface requirements. The operation system consisting of ARGO-M site, ARGO-F site, and Remote Operation Center (ROC) inside KASI is designed for remote access and the automatic tracking and control system which are the main operation concept of ARGO system. To accomplish remote operation, we are considering remote access to ARGO-F and ARGO-M from ROC. The mobile-phone service allows us to access the ARGO-F remotely and to control the system in an emergency. To implement fully automatic tracking and control function in ARGO-F, we have investigated and described the requirements about the automatic aircraft detection system and the various meteorological sensors. This paper addresses the requirements of ARGO Operation System.

  15. Engineered Barrier System performance requirements systems study report. Revision 02

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balady, M.A.

    This study evaluates the current design concept for the Engineered Barrier System (EBS), in concert with the current understanding of the geologic setting to assess whether enhancements to the required performance of the EBS are necessary. The performance assessment calculations are performed by coupling the EBS with the geologic setting based on the models (some of which were updated for this study) and assumptions used for the 1995 Total System Performance Assessment (TSPA). The need for enhancements is determined by comparing the performance assessment results against the EBS related performance requirements. Subsystem quantitative performance requirements related to the EBS includemore » the requirement to allow no more than 1% of the waste packages (WPs) to fail before 1,000 years after permanent closure of the repository, as well as a requirement to control the release rate of radionuclides from the EBS. The EBS performance enhancements considered included additional engineered components as well as evaluating additional performance available from existing design features but for which no performance credit is currently being taken.« less

  16. Shuttle/Agena study. Volume 2, part 1: Program requirements, conclusions, recommendations

    NASA Technical Reports Server (NTRS)

    1972-01-01

    An evaluation to determine the compatibility of the Agena with the space transportation system for use as an expendable third stage to the space shuttle was conducted. The Agena was considered for those missions requiring additional propulsion capability beyond that used for low earth orbit. The study defines the interface requirements imposed on both the Agena and the shuttle system and identifies those areas where the Agena must be improved or modified to satisfy mission requirements.

  17. Study of industry information requirements for flight control and navigation systems of STOL aircraft

    NASA Technical Reports Server (NTRS)

    Gorham, J. A.

    1976-01-01

    Answers to specific study questions are used to ascertain the data requirements associated with a guidance, navigation and control system for a future civil STOL airplane. Results of the study were used to recommend changes for improving the outputs of the STOLAND flight experiments program.

  18. User requirements for NASA data base management systems. Part 1: Oceanographic discipline

    NASA Technical Reports Server (NTRS)

    Fujimoto, B.

    1981-01-01

    Generic oceanographic user requirements were collected and analyzed for use in developing a general multipurpose data base management system for future missions of the Office of Space and Terrestrial Applications (OSTA) of NASA. The collection of user requirements involved; studying the state-of-the-art technology in data base management systems; analyzing the results of related studies; formulating a viable and diverse list of scientists to be interviewed; developing a presentation format and materials; and interviewing oceanographic data users. More effective data management systems are needed to handle the increasing influx of data.

  19. The Future Impact of Wind on BPA Power System Load Following and Regulation Requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makarov, Yuri V.; Lu, Shuai; McManus, Bart

    Wind power is growing in a very fast pace as an alternative generating resource. As the ratio of wind power over total system capacity increases, the impact of wind on various system aspects becomes significant. This paper presents a methodology to study the future impact of wind on BPA power system load following and regulation requirements. Existing methodologies for similar analysis include dispatch model simulation and standard deviation evaluation on load and wind data. The methodology proposed in this paper uses historical data and stochastic processes to simulate the load balancing processes in the BPA power system. It mimics themore » actual power system operations therefore the results are close to reality yet the study based on this methodology is convenient to perform. The capacity, ramp rate and ramp duration characteristics are extracted from the simulation results. System load following and regulation capacity requirements are calculated accordingly. The ramp rate and ramp duration data obtained from the analysis can be used to evaluate generator response or maneuverability requirement and regulating units’ energy requirement, respectively.« less

  20. Support requirements for remote sensor systems on unmanned planetary missions, phase 3

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The results of a study to determine the support requirements for remote sensor systems on unmanned planetary flyby and orbiter missions are presented. Sensors and experiment groupings for selected missions are also established. Computer programs were developed to relate measurement requirements to support requirements. Support requirements were determined for sensors capable of performing required measurements at various points along the trajectories of specific selected missions.

  1. Expert system verification and validation study. Phase 2: Requirements Identification. Delivery 2: Current requirements applicability

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The second phase of a task is described which has the ultimate purpose of ensuring that adequate Expert Systems (ESs) Verification and Validation (V and V) tools and techniques are available for Space Station Freedom Program Knowledge Based Systems development. The purpose of this phase is to recommend modifications to current software V and V requirements which will extend the applicability of the requirements to NASA ESs.

  2. Space station electric power system requirements and design

    NASA Technical Reports Server (NTRS)

    Teren, Fred

    1987-01-01

    An overview of the conceptual definition and design of the space station Electric Power System (EPS) is given. Responsibilities for the design and development of the EPS are defined. The EPS requirements are listed and discussed, including average and peak power requirements, contingency requirements, and fault tolerance. The most significant Phase B trade study results are summarized, and the design selections and rationale are given. Finally, the power management and distribution system architecture is presented.

  3. Space station systems analysis study. Part 3: Documentation. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The space stations systems analysis study is summarized. A cost efffective system concept capable of meeting a broad spectrum of mission requirements was developed. Candidate objectives were reviewed and implementation requirements were defined. Program options for both low earth and geosynchronous orbits were examined. Space construction concepts were analyzed and defined in detail.

  4. Requirements for Workflow-Based EHR Systems - Results of a Qualitative Study.

    PubMed

    Schweitzer, Marco; Lasierra, Nelia; Hoerbst, Alexander

    2016-01-01

    Today's high quality healthcare delivery strongly relies on efficient electronic health records (EHR). These EHR systems or in general healthcare IT-systems are usually developed in a static manner according to a given workflow. Hence, they are not flexible enough to enable access to EHR data and to execute individual actions within a consultation. This paper reports on requirements pointed by experts in the domain of diabetes mellitus to design a system for supporting dynamic workflows to serve personalization within a medical activity. Requirements were collected by means of expert interviews. These interviews completed a conducted triangulation approach, aimed to gather requirements for workflow-based EHR interactions. The data from the interviews was analyzed through a qualitative approach resulting in a set of requirements enhancing EHR functionality from the user's perspective. Requirements were classified according to four different categorizations: (1) process-related requirements, (2) information needs, (3) required functions, (4) non-functional requirements. Workflow related requirements were identified which should be considered when developing and deploying EHR systems.

  5. Electrical power systems for Space Station

    NASA Technical Reports Server (NTRS)

    Simon, W. E.

    1984-01-01

    Major challenges in power system development are described. Evolutionary growth, operational lifetime, and other design requirements are discussed. A pictorial view of weight-optimized power system applications shows which systems are best for missions of various lengths and required power level. Following definition of the major elements of the electrical power system, an overview of element options and a brief technology assessment are presented. Selected trade-study results show end-to-end system efficiencies, required photovoltaic power capability as a function of energy storage system efficiency, and comparisons with other systems such as a solar dynamic power system.

  6. Design for interaction between humans and intelligent systems during real-time fault management

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Schreckenghost, Debra L.; Thronesbery, Carroll G.

    1992-01-01

    Initial results are reported to provide guidance and assistance for designers of intelligent systems and their human interfaces. The objective is to achieve more effective human-computer interaction (HCI) for real time fault management support systems. Studies of the development of intelligent fault management systems within NASA have resulted in a new perspective of the user. If the user is viewed as one of the subsystems in a heterogeneous, distributed system, system design becomes the design of a flexible architecture for accomplishing system tasks with both human and computer agents. HCI requirements and design should be distinguished from user interface (displays and controls) requirements and design. Effective HCI design for multi-agent systems requires explicit identification of activities and information that support coordination and communication between agents. The effects are characterized of HCI design on overall system design and approaches are identified to addressing HCI requirements in system design. The results include definition of (1) guidance based on information level requirements analysis of HCI, (2) high level requirements for a design methodology that integrates the HCI perspective into system design, and (3) requirements for embedding HCI design tools into intelligent system development environments.

  7. A Numerical Climate Observing Network Design Study

    NASA Technical Reports Server (NTRS)

    Stammer, Detlef

    2003-01-01

    This project was concerned with three related questions of an optimal design of a climate observing system: 1. The spatial sampling characteristics required from an ARGO system. 2. The degree to which surface observations from ARGO can be used to calibrate and test satellite remote sensing observations of sea surface salinity (SSS) as it is anticipated now. 3. The more general design of an climate observing system as it is required in the near future for CLIVAR in the Atlantic. An important question in implementing an observing system is that of the sampling density required to observe climate-related variations in the ocean. For that purpose this project was concerned with the sampling requirements for the ARGO float system, but investigated also other elements of a climate observing system. As part of this project we studied the horizontal and vertical sampling characteristics of a global ARGO system which is required to make it fully complementary to altimeter data with the goal to capture climate related variations on large spatial scales (less thanAttachment: 1000 km). We addressed this question in the framework of a numerical model study in the North Atlantic with an 1/6 horizontal resolution. The advantage of a numerical design study is the knowledge of the full model state. Sampled by a synthetic float array, model results will therefore allow to test and improve existing deployment strategies with the goal to make the system as optimal and cost-efficient as possible. Attachment: "Optimal observations for variational data assimilation".

  8. Mobile radio alternative systems study, executive summary

    NASA Technical Reports Server (NTRS)

    Anderson, R. E.; Cromwell, N.; Lester, H. L.

    1983-01-01

    Present day mobile communication technologies, systems and equipment are described from background in evaluating the concepts generated in the study. Average propagation ranges are calculated for terrestrial installations in each of seven physiographic areas of the contiguous states to determine the number of installations that would be required for nationwide coverage. Four system concepts are defined and analyzed to determine how well terrestrial systems can fulfill the requirements at acceptable costs.

  9. Study on the Future Internet System through Analysis of SCADA Systems

    NASA Astrophysics Data System (ADS)

    Song, Jae-Gu; Jung, Sungmo; Kim, Seoksoo

    Research on the future Internet is focused on establishing standards by solving problems through various projects and accepting various requirements. In this study, the SCADA (Supervisory Control And Data Acquisition) environment, closely related with national infrastructure, is analyzed in order to explore requirements of the future Internet and then those of the SCADA network. Also, this study provides SCADA system environments for the future Internet.

  10. Orbital transfer vehicle concept definition and system analysis study. Volume 2: OTV concept definition and evaluation. Book 1: Mission and system requirements

    NASA Technical Reports Server (NTRS)

    Kofal, Allen E.

    1987-01-01

    The mission and system requirements for the concept definition and system analysis of the Orbital Transfer Vehicle (OTV) are established. The requirements set forth constitute the single authority for the selection, evaluation, and optimization of the technical performance and design of the OTV. This requirements document forms the basis for the Ground and Space Based OTV concept definition analyses and establishes the physical, functional, performance and design relationships to STS, Space Station, Orbital Maneuvering Vehicle (OMV), and payloads.

  11. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BEVINS, R.R.

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated duringmore » the second phase of the W314 Project to cover the second phase of the project's scope.« less

  12. Systems Operation Studies for Automated Guideway Transit Systems: Feeder Systems Model Functional Specification

    DOT National Transportation Integrated Search

    1981-01-01

    This document specifies the functional requirements for the AGT-SOS Feeder Systems Model (FSM), the type of hardware required, and the modeling techniques employed by the FSM. The objective of the FSM is to map the zone-to-zone transit patronage dema...

  13. Solar power satellite. System definition study. Part 1, volume 4: SPS transportation system requirements. [spacecraft propulsion

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The best estimates of space transportation requirements for cargo launch vehicles, personnel launch carriers, high thrust orbit transfer, and electric orbit transfer systems are discussed, along with the rationale for each.

  14. Avionic architecture requirements for Space Exploration Initiative systems

    NASA Technical Reports Server (NTRS)

    Herbella, C. G.; Brown, D. C.

    1991-01-01

    The authors discuss NASA's Strategic Avionics Technology Working Group (SATWG) and the results of the first study commissioned by the SATWG, the Space Avionics Requirements Study (SARS). The goal of the SARS task was to show that an open avionics architecture, using modular, standardized components, could be applied across the wide range of systems that comprise the Space Exploration Initiative. The study addressed systems ranging from expendable launch vehicles and the space station to surface systems such as Mars or lunar rovers and habitats. Top-level avionics requirements were derived from characterizations of each of the systems considered. Then a set of avionics subsystems were identified, along with estimates of the numbers and types of modules needed to meet the requirements. Applicability of these results across the infrastructure was then illustrated. In addition to these tasks, critical technologies were identified, characterized, and assessed in terms of their criticality and impact on the program. Design, development, test, and evaluation methods were addressed to identify potential areas of improvement.

  15. Effective Crew Operations: An Analysis of Technologies for Improving Crew Activities and Medical Procedures

    NASA Technical Reports Server (NTRS)

    Harvey, Craig

    2005-01-01

    NASA's vision for space exploration (February 2004) calls for development of a new crew exploration vehicle, sustained lunar operations, and human exploration of Mars. To meet the challenges of planned sustained operations as well as the limited communications between Earth and the crew (e.g., Mars exploration), many systems will require crews to operate in an autonomous environment. It has been estimated that once every 2.4 years a major medical issue will occur while in space. NASA's future travels, especially to Mars, will begin to push this timeframe. Therefore, now is the time for investigating technologies and systems that will support crews in these environments. Therefore, this summer two studies were conducted to evaluate the technology and systems that may be used by crews in future missions. The first study evaluated three commercial Indoor Positioning Systems (IPS) (Versus, Ekahau, and Radianse) that can track equipment and people within a facility. While similar to Global Positioning Systems (GPS), the specific technology used is different. Several conclusions can be drawn from the evaluation conducted, but in summary it is clear that none of the systems provides a complete solution in meeting the tracking and technology integration requirements of NASA. From a functional performance (e.g., system meets user needs) evaluation perspective, Versus performed fairly well on all performance measures as compared to Ekahau and Radianse. However, the system only provides tracking at the room level. Thus, Versus does not provide the level of fidelity required for tracking assets or people for NASA requirements. From an engineering implementation perspective, Ekahau is far simpler to implement that the other two systems because of its wi-fi design (e.g., no required runs of cable). By looking at these two perspectives, one finds there was no clear system that met NASA requirements. Thus it would be premature to suggest that any of these systems are ready for implementation and further study is required.

  16. Microgravity combustion discipline working group summary of requirements for noncontact temperature measurements

    NASA Technical Reports Server (NTRS)

    Sacksteder, Kurt

    1988-01-01

    Current efforts of the Microgravity Combustion Working Group are summarized and the temperature measurement requirements for the combustion studies are defined. Many of the combustion systems that are studied in the low gravity environment are near-limit systems, that is, systems that are acting near the limit of flammability in terms of oxygen concentration or fuel concentration. Systems of this type are normally weak in the sense that there is a delicate balance between the heat released in the flame and the heat required to sustain the flame. Intrusive or perturbative temperature measurement probes can be inaccurate in these situations and in the limiting case extinguish the flame. Noncontact techniques then become the only way to obtain the required measurements. Noncontact measurement requirements for each of the three thermodynamic phases are described in terms of spatial and temporal resolution and temperature range.

  17. Space station needs, attributes, and architectural options study. Volume 1: Missions and requirements

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Science and applications, NOAA environmental observation, commercial resource observations, commercial space processing, commercial communications, national security, technology development, and GEO servicing are addressed. Approach to time phasing of mission requirements, system sizing summary, time-phased user mission payload support, space station facility requirements, and integrated time-phased system requirements are also addressed.

  18. Librarians in Name Only: Systems Librarianship and Job Seeking: A Content Analysis.

    ERIC Educational Resources Information Center

    Taylor, Robbie F.

    This study surveys previous research about systems librarians and performs a systematic examination of position requirements through analysis of position announcements, responsibilities, required skills, job titles, degree requirements, personality qualifications, and salaries. The educational needs and emergent curriculum appropriate for…

  19. Advanced EVA system design requirements study

    NASA Technical Reports Server (NTRS)

    Woods, T. G.

    1988-01-01

    The results are presented of a study to identify specific criteria regarding space station extravehicular activity system (EVAS) hardware requirements. Key EVA design issues include maintainability, technology readiness, LSS volume vs. EVA time available, suit pressure/cabin pressure relationship and productivity effects, crew autonomy, integration of EVA as a program resource, and standardization of task interfaces. A variety of DOD EVA systems issues were taken into consideration. Recommendations include: (1) crew limitations, not hardware limitations; (2) capability to perform all of 15 generic missions; (3) 90 days on-orbit maintainability with 50 percent duty cycle as minimum; and (4) use by payload sponsors of JSC document 10615A plus a Generic Tool Kit and Specialized Tool Kit description. EVA baseline design requirements and criteria, including requirements of various subsystems, are outlined. Space station/EVA system interface requirements and EVA accommodations are discussed in the areas of atmosphere composition and pressure, communications, data management, logistics, safe haven, SS exterior and interior requirements, and SS airlock.

  20. Geosynchronous platform definition study. Volume 4, Part 2: Traffic analysis and system requirements for the new traffic model

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A condensed summary of the traffic analyses and systems requirements for the new traffic model is presented. The results of each study activity are explained, key analyses are described, and important results are highlighted.

  1. Requirements for a mobile communications satellite system. Volume 3: Large space structures measurements study

    NASA Technical Reports Server (NTRS)

    Akle, W.

    1983-01-01

    This study report defines a set of tests and measurements required to characterize the performance of a Large Space System (LSS), and to scale this data to other LSS satellites. Requirements from the Mobile Communication Satellite (MSAT) configurations derived in the parent study were used. MSAT utilizes a large, mesh deployable antenna, and encompasses a significant range of LSS technology issues in the areas of structural/dynamics, control, and performance predictability. In this study, performance requirements were developed for the antenna. Special emphasis was placed on antenna surface accuracy, and pointing stability. Instrumentation and measurement systems, applicable to LSS, were selected from existing or on-going technology developments. Laser ranging and angulation systems, presently in breadboard status, form the backbone of the measurements. Following this, a set of ground, STS, and GEO-operational were investigated. A third scale (15 meter) antenna system as selected for ground characterization followed by STS flight technology development. This selection ensures analytical scaling from ground-to-orbit, and size scaling. Other benefits are cost and ability to perform reasonable ground tests. Detail costing of the various tests and measurement systems were derived and are included in the report.

  2. Scheduling Real-Time Mixed-Criticality Jobs

    NASA Astrophysics Data System (ADS)

    Baruah, Sanjoy K.; Bonifaci, Vincenzo; D'Angelo, Gianlorenzo; Li, Haohan; Marchetti-Spaccamela, Alberto; Megow, Nicole; Stougie, Leen

    Many safety-critical embedded systems are subject to certification requirements; some systems may be required to meet multiple sets of certification requirements, from different certification authorities. Certification requirements in such "mixed-criticality" systems give rise to interesting scheduling problems, that cannot be satisfactorily addressed using techniques from conventional scheduling theory. In this paper, we study a formal model for representing such mixed-criticality workloads. We demonstrate first the intractability of determining whether a system specified in this model can be scheduled to meet all its certification requirements, even for systems subject to two sets of certification requirements. Then we quantify, via the metric of processor speedup factor, the effectiveness of two techniques, reservation-based scheduling and priority-based scheduling, that are widely used in scheduling such mixed-criticality systems, showing that the latter of the two is superior to the former. We also show that the speedup factors are tight for these two techniques.

  3. Multi-faceted informatics system for digitising and streamlining the reablement care model.

    PubMed

    Bond, Raymond R; Mulvenna, Maurice D; Finlay, Dewar D; Martin, Suzanne

    2015-08-01

    Reablement is new paradigm to increase independence in the home amongst the ageing population. And it remains a challenge to design an optimal electronic system to streamline and integrate reablement into current healthcare infrastructure. Furthermore, given reablement requires collaboration with a range of organisations (including national healthcare institutions and community/voluntary service providers), such a system needs to be co-created with all stakeholders involved. Thus, the purpose of this study is, (1) to bring together stakeholder groups to elicit a comprehensive set of requirements for a digital reablement system, (2) to utilise emerging technologies to implement a system and a data model based on the requirements gathered and (3) to involve user groups in a usability assessment of the system. In this study we employed a mixed qualitative approach that included a series of stakeholder-involved activities. Collectively, 73 subjects were recruited to participate in an ideation event, a quasi-hackathon and a usability study. The study unveiled stakeholder-led requirements, which resulted in a novel cloud-based system that was created using emerging web technologies. The system is driven by a unique data model and includes interactive features that are necessary for streamlining the reablement care model. In summary, this system allows community based interventions (or services) to be prescribed to occupants whilst also monitoring the occupant's progress of independent living. Copyright © 2015 Elsevier Inc. All rights reserved.

  4. Controlled ecological life support system higher plant flight experiments

    NASA Technical Reports Server (NTRS)

    Tibbitts, T. W.; Wheeler, R. M.

    1984-01-01

    Requirements for spaceflight experments which involve higher plants were determined. The plants are studied for use in controlled ecological life support systems (CELSS). Two categories of research requirements are discussed: (1) the physical needs which include nutrient, water and gas exchange requirements; (2) the biological and physiological functions which affect plants in zero gravity environments. Physical problems studies are given the priority since they affect all biological experiments.

  5. Orbital transfer vehicle concept definition and system analysis study, 1985. Volume 3: System and program trades

    NASA Technical Reports Server (NTRS)

    Nelson, James H.; Mohrman, Gordon W.; Callan, Daniel R.

    1986-01-01

    The key system and program trade studies performed to arrive at a preferred Orbital Transfer Vehicle (OTV) system concept and evolutionary approach to the acquisition of the requisite capabilites is documented. These efforts were expanded to encompass a Space Transportation Architecture Study (STAS) mission model and recommended unmanned cargo vehicle. The most important factors affecting the results presented are the mission model requirements and selection criteria. The reason for conducting the OTV concept definition and system analyses study is to select a concept and acquisition approach that meets a delivery requirement reflected by the mission model.

  6. Automated Ground Umbilical Systems (AGUS) Project

    NASA Technical Reports Server (NTRS)

    Gosselin, Armand M.

    2007-01-01

    All space vehicles require ground umbilical systems for servicing. Servicing requirements can include, but are not limited to, electrical power and control, propellant loading and venting, pneumatic system supply, hazard gas detection and purging as well as systems checkout capabilities. Of the various types of umbilicals, all require several common subsystems. These typically include an alignment system, mating and locking system, fluid connectors, electrical connectors and control !checkout systems. These systems have been designed to various levels of detail based on the needs for manual and/or automation requirements. The Automated Ground Umbilical Systems (AGUS) project is a multi-phase initiative to develop design performance requirements and concepts for launch system umbilicals. The automation aspect minimizes operational time and labor in ground umbilical processing while maintaining reliability. This current phase of the project reviews the design, development, testing and operations of ground umbilicals built for the Saturn, Shuttle, X-33 and Atlas V programs. Based on the design and operations lessons learned from these systems, umbilicals can be optimized for specific applications. The product of this study is a document containing details of existing systems and requirements for future automated umbilical systems with emphasis on design-for-operations (DFO).

  7. Atmosphere explorer missions C, D, and E. Spacecraft experiment interface definition study

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The Atmosphere Explorer Missions C, D, & E Spacecraft/Experiment Interface Definition Study is discussed. The objectives of the study included an analysis of the accommodation requirements of the experiments for the three missions, an assessment of the overall effect of these requirements on the spacecraft system design and performance, and the detailed definition of all experiment/spacecraft electrical, mechanical, and environmental interfaces. In addition, the study included the identification and definition of system characteristics required to ensure compatibility with the consolidated STADAN and MSFN communications networks.

  8. Study of solid rocket motor for space shuttle booster, volume 2, book 3, appendix A

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A systems requirements analysis for the solid propellant rocket engine to be used with the space shuttle was conducted. The systems analysis was developed to define the physical and functional requirements for the systems and subsystems. The operations analysis was performed to identify the requirements of the various launch operations, mission operations, ground operations, and logistic and flight support concepts.

  9. Space Station Human Factors Research Review. Volume 1: EVA Research and Development

    NASA Technical Reports Server (NTRS)

    Cohen, Marc M. (Editor); Vykukal, H. C. (Editor)

    1988-01-01

    An overview is presented of extravehicular activity (EVA) research and development activities at Ames. The majority of the program was devoted to presentations by the three contractors working in parallel on the EVA System Phase A Study, focusing on Implications for Man-Systems Design. Overhead visuals are included for a mission results summary, space station EVA requirements and interface accommodations summary, human productivity study cross-task coordination, and advanced EVAS Phase A study implications for man-systems design. Articles are also included on subsea approach to work systems development and advanced EVA system design requirements.

  10. Earth resources ground data handling systems for the 1980's

    NASA Technical Reports Server (NTRS)

    Vanvleck, E. M.; Sinclair, K. F.; Pitts, S. W.; Slye, R. E.

    1973-01-01

    The system requirements of an operational data handling system for earth resources in the decade of the 1980's are investigated. Attention is drawn to problems encountered in meeting the stringent agricultural user requirements of that time frame. Such an understanding of requirements is essential not only in designing the ground system that will ultimately handle the data, but also in design studies of the earth resources platform, sensors, and data relay satellites which may be needed.

  11. Patient Accounting Systems: Are They Fit with the Users' Requirements?

    PubMed

    Ayatollahi, Haleh; Nazemi, Zahra; Haghani, Hamid

    2016-01-01

    A patient accounting system is a subsystem of a hospital information system. This system like other information systems should be carefully designed to be able to meet users' requirements. The main aim of this research was to investigate users' requirements and to determine whether current patient accounting systems meet users' needs or not. This was a survey study, and the participants were the users of six patient accounting systems used in 24 teaching hospitals. A stratified sampling method was used to select the participants (n = 216). The research instruments were a questionnaire and a checklist. The mean value of ≥3 showed the importance of each data element and the capability of the system. Generally, the findings showed that the current patient accounting systems had some weaknesses and were able to meet between 70% and 80% of users' requirements. The current patient accounting systems need to be improved to be able to meet users' requirements. This approach can also help to provide hospitals with more usable and reliable financial information.

  12. Analysis of space systems for the space disposal of nuclear waste follow-on study. Volume 2: Technical report

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The space option for disposal of certain high-level nuclear wastes in space as a complement to mined geological repositories is studied. A brief overview of the study background, scope, objective, guidelines and assumptions, and contents is presented. The determination of the effects of variations in the waste mix on the space systems concept to allow determination of the space systems effect on total system risk benefits when used as a complement to the DOE reference mined geological repository is studied. The waste payload system, launch site, launch system, and orbit transfer system are all addressed. Rescue mission requirements are studied. The characteristics of waste forms suitable for space disposal are identified. Trajectories and performance requirements are discussed.

  13. Solar thermal plant impact analysis and requirements definition study

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The technology and economics of solar thermal electric systems (STES) for electric power production is discussed. The impacts of and requirements for solar thermal electric power systems were evaluated.

  14. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 5: Detailed system requirements: Two case studies

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Major resource management missions to be performed by the TERSSE are examined in order to develop an understanding of the form and function of a system designed to perform an operational mission. Factors discussed include: resource manager (user) functions, methods of performing their function, the information flows and information requirements embodied in their function, and the characteristics of the observation system which assists in the management of the resource involved. The missions selected for study are: world crop survey and land resources management. These missions are found to represent opposite ends of the TERSSE spectrum and to support the conclusion that different missions require different systems and must be analyzed in detail to permit proper system development decisions.

  15. Automated personnel data base system specifications, Task V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.

    1978-11-01

    The full title of this study is 'Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirements Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.

  16. Functional Requirements Study

    DTIC Science & Technology

    2008-07-01

    Identification System, AIS, Vessel Traffic Services, VTS, Transmit, Broadcast, Functional Requirements, United States Coast Guard, USCG, Mariner, Electronic ...Chart Systems, ECS, Vessel Operators, National Oceanic Atmospheric Administration, NOAA, US Army Corp of Engineers , USACE, ECDIS 18. Distribution...and River Information Service COPT Captain of the Port DGPS Differential Global Positioning System ECDIS Electronic Chart Display Information System

  17. Surface Nuclear Power for Human Mars Missions

    NASA Technical Reports Server (NTRS)

    Mason, Lee S.

    1999-01-01

    The Design Reference Mission for NASA's human mission to Mars indicates the desire for in-situ propellant production and bio-regenerative life systems to ease Earth launch requirements. These operations, combined with crew habitation and science, result in surface power requirements approaching 160 kilowatts. The power system, delivered on an early cargo mission, must be deployed and operational prior to crew departure from Earth. The most mass efficient means of satisfying these requirements is through the use of nuclear power. Studies have been performed to identify a potential system concept using a mobile cart to transport the power system away from the Mars lander and provide adequate separation between the reactor and crew. The studies included an assessment of reactor and power conversion technology options, selection of system and component redundancy, determination of optimum separation distance, and system performance sensitivity to some key operating parameters. The resulting system satisfies the key mission requirements including autonomous deployment, high reliability, and cost effectiveness at a overall system mass of 12 tonnes and a stowed volume of about 63 cu m.

  18. Spacecraft systems engineering: An introduction to the process at GSFC

    NASA Technical Reports Server (NTRS)

    Fragomeni, Tony; Ryschkewitsch, Michael G.

    1993-01-01

    The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

  19. Saint Lawrence Seaway Navigation-Aid System Study : Volume I - Text and Appendixes A and D

    DOT National Transportation Integrated Search

    1978-09-01

    The requirements for a navigation guidance system which will effect an increase in the ship processing capacity of the Saint Lawrence Seaway (Lake Ontario to Montreal, Quebec) are developed. The requirements include a specification of system position...

  20. Electrocardiogram Scanner-System Requirements

    DOT National Transportation Integrated Search

    1973-03-01

    An experimental and analytical study has been conducted to establish the feasibility for scanning and digitizing electrocardiogram records. The technical requirements and relative costs for two systems are discussed herein. One is designed to automat...

  1. The study on knowledge transferring incentive for information system requirement development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Yang

    2015-03-10

    Information system requirement development is a process of users’ knowledge sharing and transferring. However the tacit requirements developing is a main problem during requirement development process, for the reason of difficult to encoding, express, and communicate. Knowledge fusion and corporate effort is needed to finding tacit requirements. Under this background, our paper try to find out the rule of effort dynamic evolutionary of software developer and user by building an evolutionary game model on the condition of incentive system. And in addition this paper provides an in depth discussion at the end of this paper.

  2. Low-thrust chemical orbit to orbit propulsion system propellant management study

    NASA Technical Reports Server (NTRS)

    Dergance, R. H.

    1980-01-01

    Propellant requirements, tankage configurations, preferred propellant management techniques, propulsion systems weights, and technology deficiencies for low thrust expendable propulsion systems are examined. A computer program was utilized which provided a complete propellant inventory (including boil-off for cryogenic cases), pressurant and propellant tank dimensions for a given ullage, pressurant requirements, insulation requirements, and miscellaneous masses. The output also includes the masses of all tanks; the mass of the insulation, engines and other components; total wet system and burnout mass; system mass fraction; total impulse and burn time.

  3. Study of auxiliary propulsion requirements for large space systems, volume 2

    NASA Technical Reports Server (NTRS)

    Smith, W. W.; Machles, G. W.

    1983-01-01

    A range of single shuttle launched large space systems were identified and characterized including a NASTRAN and loading dynamics analysis. The disturbance environment, characterization of thrust level and APS mass requirements, and a study of APS/LSS interactions were analyzed. State-of-the-art capabilities for chemical and ion propulsion were compared with the generated propulsion requirements to assess the state-of-the-art limitations and benefits of enhancing current technology.

  4. Requirements for guidelines systems: implementation challenges and lessons from existing software-engineering efforts.

    PubMed

    Shah, Hemant; Allard, Raymond D; Enberg, Robert; Krishnan, Ganesh; Williams, Patricia; Nadkarni, Prakash M

    2012-03-09

    A large body of work in the clinical guidelines field has identified requirements for guideline systems, but there are formidable challenges in translating such requirements into production-quality systems that can be used in routine patient care. Detailed analysis of requirements from an implementation perspective can be useful in helping define sub-requirements to the point where they are implementable. Further, additional requirements emerge as a result of such analysis. During such an analysis, study of examples of existing, software-engineering efforts in non-biomedical fields can provide useful signposts to the implementer of a clinical guideline system. In addition to requirements described by guideline-system authors, comparative reviews of such systems, and publications discussing information needs for guideline systems and clinical decision support systems in general, we have incorporated additional requirements related to production-system robustness and functionality from publications in the business workflow domain, in addition to drawing on our own experience in the development of the Proteus guideline system (http://proteme.org). The sub-requirements are discussed by conveniently grouping them into the categories used by the review of Isern and Moreno 2008. We cite previous work under each category and then provide sub-requirements under each category, and provide example of similar work in software-engineering efforts that have addressed a similar problem in a non-biomedical context. When analyzing requirements from the implementation viewpoint, knowledge of successes and failures in related software-engineering efforts can guide implementers in the choice of effective design and development strategies.

  5. Requirements for guidelines systems: implementation challenges and lessons from existing software-engineering efforts

    PubMed Central

    2012-01-01

    Background A large body of work in the clinical guidelines field has identified requirements for guideline systems, but there are formidable challenges in translating such requirements into production-quality systems that can be used in routine patient care. Detailed analysis of requirements from an implementation perspective can be useful in helping define sub-requirements to the point where they are implementable. Further, additional requirements emerge as a result of such analysis. During such an analysis, study of examples of existing, software-engineering efforts in non-biomedical fields can provide useful signposts to the implementer of a clinical guideline system. Methods In addition to requirements described by guideline-system authors, comparative reviews of such systems, and publications discussing information needs for guideline systems and clinical decision support systems in general, we have incorporated additional requirements related to production-system robustness and functionality from publications in the business workflow domain, in addition to drawing on our own experience in the development of the Proteus guideline system (http://proteme.org). Results The sub-requirements are discussed by conveniently grouping them into the categories used by the review of Isern and Moreno 2008. We cite previous work under each category and then provide sub-requirements under each category, and provide example of similar work in software-engineering efforts that have addressed a similar problem in a non-biomedical context. Conclusions When analyzing requirements from the implementation viewpoint, knowledge of successes and failures in related software-engineering efforts can guide implementers in the choice of effective design and development strategies. PMID:22405400

  6. Shuttle-tethered satellite system definition study extension

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A system requirements definition and configuration study (Phase B) of the Tethered Satellite System (TSS) was conducted during the period 14 November 1977 to 27 February 1979. Subsequently a study extension was conducted during the period 13 June 1979 to 30 June 1980, for the purpose of refining the requirements identified during the main phase of the study, and studying in some detail the implications of accommodating various types of scientific experiments on the initial verification flight mission. An executive overview is given of the Tethered Satellite System definition developed during the study. The results of specific study tasks undertaken in the extension phase of the study are reported. Feasibility of the Tethered Satellite System has been established with reasonable confidence and the groundwork laid for proceeding with hardware design for the verification mission.

  7. Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG), volume 1

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Twenty-four functional requirements were prepared under six categories and serve to indicate how to integrate dispersed storage generation (DSG) systems with the distribution and other portions of the electric utility system. Results indicate that there are no fundamental technical obstacles to prevent the connection of dispersed storage and generation to the distribution system. However, a communication system of some sophistication is required to integrate the distribution system and the dispersed generation sources for effective control. The large-size span of generators from 10 KW to 30 MW means that a variety of remote monitoring and control may be required. Increased effort is required to develop demonstration equipment to perform the DSG monitoring and control functions and to acquire experience with this equipment in the utility distribution environment.

  8. Technology requirements for a generic aerocapture system. [for atmospheric entry

    NASA Technical Reports Server (NTRS)

    Cruz, M. I.

    1980-01-01

    The technology requirements for the design of a generic aerocapture vehicle system are summarized. These spacecraft have the capability of completely eliminating fuel-costly retropropulsion for planetary orbit capture through a single aerodynamically controlled atmospheric braking pass from a hyperbolic trajectory into a near circular orbit. This generic system has application at both the inner and outer planets. Spacecraft design integration, navigation, communications, and aerothermal protection system design problems were assessed in the technology requirements study and are discussed in this paper.

  9. Space Operations Center system analysis study extension. Volume 4, book 2: SOC system analysis report

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Operations Center (SOC) orbital space station research missions integration, crew requirements, SOC operations, and configurations are analyzed. Potential research and applications missions and their requirements are described. The capabilities of SOC are compared with user requirements. The SOC/space shuttle and shuttle-derived vehicle flight support operations and SOC orbital operations are described. Module configurations and systems options, SOC/external tank configurations, and configurations for geostationary orbits are described. Crew and systems safety configurations are summarized.

  10. The Requirement Generation for the SKYLON Launch System

    NASA Astrophysics Data System (ADS)

    Hempsell, M.

    SKYLON is a reusable single stage to orbit spaceplane intended to lower the cost of reaching space. The project has a 25 year history stretching back to the British Aerospace HOTOL study and over the many configuration iterations the performance has been established using feasibility designs, with market studies being used to establish that the resulting system has utility. In preparation for the final concept study of the D1 configuration the market and other stakeholder's requirements have been prepared as an input rather than an output to the design process. These requirements have been established from both an analysis of the existing market - as a model for the entry into service requirements - and future studies of advanced applications - as a model for the longer term requirements. The final conclusions have been incorporated into a preliminary User Manual which is the basis of a requirements' validation exercise.

  11. Satellite services system analysis study. Volume 5: Programmatics

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.

  12. A design study of a reaction control system for a V/STOL fighter/attack aircraft

    NASA Technical Reports Server (NTRS)

    Beard, B. B.; Foley, W. H.

    1983-01-01

    Attention is given to a short takeoff vertical landing (STOVL) aircraft reaction control system (RCS) design study. The STOVL fighter/attack aircraft employs an existing turbofan engine, and its hover requirement places a premium on weight reduction, which eliminates prospective nonairbreathing RCSs. A simple engine compressor bleed RCS degrades overall performance to an unacceptable degree, and the supersonic requirement precludes the large volume alternatives of thermal or ejector thrust augmentation systems as well as the ducting of engine exhaust gases and the use of a dedicated turbojet. The only system which addressed performance criteria without requiring major engine modifications was a dedicated load compressor driven by an auxilliary power unit.

  13. Considerations for designing robotic upper limb rehabilitation devices

    NASA Astrophysics Data System (ADS)

    Nadas, I.; Vaida, C.; Gherman, B.; Pisla, D.; Carbone, G.

    2017-12-01

    The present study highlights the advantages of robotic systems for post-stroke rehabilitation of the upper limb. The latest demographic studies illustrate a continuous increase of the average life span, which leads to a continuous increase of stroke incidents and patients requiring rehabilitation. Some studies estimate that by 2030 the number of physical therapists will be insufficient for the patients requiring physical rehabilitation, imposing a shift in the current methodologies. A viable option is the implementation of robotic systems that assist the patient in performing rehabilitation exercises, the physical therapist role being to establish the therapeutic program for each patient and monitor their individual progress. Using a set of clinical measurements for the upper limb motions, the analysis of rehabilitation robotic systems provides a comparative study between the motions required by clinicians and the ones that robotic systems perform for different therapeutic exercises. A critical analysis of existing robots is performed using several classifications: mechanical design, assistance type, actuation and power transmission, control systems and human robot interaction (HRI) strategies. This classification will determine a set of pre-requirements for the definition of new concepts and efficient solutions for robotic assisted rehabilitation therapy.

  14. Suit study - The impact of VMS in subsystem integration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hill, B.; Watts, R.

    1992-02-01

    One of the thrusts of the Wright Laboratory/FIVE-sponsored Subsystem Integration Technology (SUIT) study is to investigate the impact of emerging vehicle management system (VMS) concepts on subsystem integration. This paper summarizes the issues relating to VMS/subsystem integration as examined during the Northrop SUIT study. Projected future weapon system requirements are identified and their impact on VMS and subsystem design interpreted. Integrated VMS/subsystem control and management functions are proposed. A candidate system VMS architecture satisfying the aforementioned weapon system requirements and providing the identified control and management functions is proposed. This architecture is used, together with the environmental control system, asmore » an illustrative subsystem example, to address the risks associated with the design, development, procurement, integration and testing of integrated VMS/subsystem concepts. The conclusion is that the development process requires an airframer to adopt the role of subsystem integrator, the consequences of which are discussed. 2 refs.« less

  15. Scheduling language and algorithm development study. Volume 1: Study summary and overview

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

  16. Advanced-technology space station study: Summary of systems and pacing technologies

    NASA Technical Reports Server (NTRS)

    Butterfield, A. J.; Garn, P. A.; King, C. B.; Queijo, M. J.

    1990-01-01

    The principal system features defined for the Advanced Technology Space Station are summarized and the 21 pacing technologies identified during the course of the study are described. The descriptions of system configurations were extracted from four previous study reports. The technological areas focus on those systems particular to all large spacecraft which generate artificial gravity by rotation. The summary includes a listing of the functions, crew requirements and electrical power demand that led to the studied configuration. The pacing technologies include the benefits of advanced materials, in-orbit assembly requirements, stationkeeping, evaluations of electrical power generation alternates, and life support systems. The descriptions of systems show the potential for synergies and identifies the beneficial interactions that can result from technological advances.

  17. Information transfer satellite concept study. Volume 1: Summary

    NASA Technical Reports Server (NTRS)

    Bergin, P.; Kincade, C.; Kurpiewski, D.; Leinhaupel, F.; Millican, F.; Onstad, R.

    1971-01-01

    A wide range of information transfer demands were identified and analyzed. They were then combined into an appropriate set of requirements for satellite communication services. In this process the demands were ranked and combined into single and multipurpose satellite systems. A detailed analysis was performed on each satellite system to determine: total system cost, including both ground and space segments; sensitivities of the systems to various system tradeoffs; and forcing functions which control the system variations. A listing of candidate missions for detailed study is presented, along with a description of the conceptual system design and an identification of the technology developments required to bring these systems to fruition.

  18. Space Vehicle Power System Comprised of Battery/Capacitor Combinations

    NASA Technical Reports Server (NTRS)

    Camarotte, C.; Lancaster, G. S.; Eichenberg, D.; Butler, S. M.; Miller, J. R.

    2002-01-01

    Recent improvements in energy densities of batteries open the possibility of using electric rather that hydraulic actuators in space vehicle systems. However, the systems usually require short-duration, high-power pulses. This power profile requires the battery system to be sized to meet the power requirements rather than stored energy requirements, often resulting in a large and inefficient energy storage system. Similar transient power applications have used a combination of two or more disparate energy storage technologies. For instance, placing a capacitor and a battery side-by-side combines the high energy density of a battery with the high power performance of a capacitor and thus can create a lighter and more compact system. A parametric study was performed to identify favorable scenarios for using capacitors. System designs were then carried out using equivalent circuit models developed for five commercial electrochemical capacitor products. Capacitors were sized to satisfy peak power levels and consequently "leveled" the power requirement of the battery, which can then be sized to meet system energy requirements. Simulation results clearly differentiate the performance offered by available capacitor products for the space vehicle applications.

  19. System requirements for a computerised patient record information system at a busy primary health care clinic.

    PubMed

    Blignaut, P J; McDonald, T; Tolmie, C J

    2001-05-01

    A prototyping approach was used to determine the essential system requirements of a computerised patient record information system for a typical township primary health care clinic. A pilot clinic was identified and the existing manual system and business processes in this clinic was studied intensively before the first prototype was implemented. Interviews with users, incidental observations and analysis of actual data entered were used as primary techniques to refine the prototype system iteratively until a system with an acceptable data set and adequate functionalities were in place. Several non-functional and user-related requirements were also discovered during the prototyping period.

  20. Information data systems for a global change technology initiative architecture trade study

    NASA Technical Reports Server (NTRS)

    Murray, Nicholas D.

    1991-01-01

    The Global Change Technology Initiative (GCTI) was established to develop technology which will enable use of satellite systems of Earth observations on a global scale, enable use of the observations to predictively model Earth's changes, and provide scientists, government, business, and industry with quick access to the resulting information. At LaRC, a GCTI Architecture Trade Study was undertaken to develop and evaluate the architectural implications to meet the requirements of the global change studies and the eventual implementation of a global change system. The output of the trade study are recommended technologies for the GCTI. That portion of the study concerned with the information data system is documented. The information data system for an earth global change modeling system can be very extensive and beyond affordability in terms of today's costs. Therefore, an incremental approach to gaining a system is most likely. An options approach to levels of capability versus needed technologies was developed. The primary drivers of the requirements for the information data system evaluation were the needed science products, the science measurements, the spacecraft orbits, the instruments configurations, and the spacecraft configurations and their attendant architectures. The science products requirements were not studied here; however, some consideration of the product needs were included in the evaluation results. The information data system technology items were identified from the viewpoint of the desirable overall information system characteristics.

  1. User requirements for a patient scheduling system

    NASA Technical Reports Server (NTRS)

    Zimmerman, W.

    1979-01-01

    A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.

  2. Operational Impacts of Wind Energy Resources in the Bonneville Power Administration Control Area - Phase I Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makarov, Yuri V.; Lu, Shuai

    2008-07-15

    This report presents a methodology developed to study the future impact of wind on BPA power system load following and regulation requirements. The methodology uses historical data and stochastic processes to simulate the load balancing processes in the BPA power system, by mimicking the actual power system operations. Therefore, the results are close to reality, yet the study based on this methodology is convenient to conduct. Compared with the proposed methodology, existing methodologies for doing similar analysis include dispatch model simulation and standard deviation evaluation on load and wind data. Dispatch model simulation is constrained by the design of themore » dispatch program, and standard deviation evaluation is artificial in separating the load following and regulation requirements, both of which usually do not reflect actual operational practice. The methodology used in this study provides not only capacity requirement information, it also analyzes the ramp rate requirements for system load following and regulation processes. The ramp rate data can be used to evaluate generator response/maneuverability requirements, which is another necessary capability of the generation fleet for the smooth integration of wind energy. The study results are presented in an innovative way such that the increased generation capacity or ramp requirements are compared for two different years, across 24 hours a day. Therefore, the impact of different levels of wind energy on generation requirements at different times can be easily visualized.« less

  3. Digital Avionics Information System (DAIS): Training Requirements Analysis Model (TRAMOD).

    ERIC Educational Resources Information Center

    Czuchry, Andrew J.; And Others

    The training requirements analysis model (TRAMOD) described in this report represents an important portion of the larger effort called the Digital Avionics Information System (DAIS) Life Cycle Cost (LCC) Study. TRAMOD is the second of three models that comprise an LCC impact modeling system for use in the early stages of system development. As…

  4. Pacific Basin Communications Study, Volume 1

    NASA Technical Reports Server (NTRS)

    Young, E. L.; Hurd, J. N.

    1981-01-01

    The Pacific Basin Communications Study describes and assesses extent telecommunications systems in the Pacific Islands region. The study examines user needs in terms of the development of social services and commercial activities. Alternative technological solutions to communications problems are proposed and described. Recommendations include the augmentation and improvement of existing systems allowing for increased communications capacity. Regional cooperation will be required to accommodate the specific, unique requirements of individual nations. Questions of financing, implementation, management, costs and benefits of a regional telecommunications system are discussed.

  5. A spacecraft integrated power/attitude control system

    NASA Technical Reports Server (NTRS)

    Keckler, C. R.; Jacobs, K. L.

    1974-01-01

    A study to determine the viability and application of a system capable of performing the dual function of power storage/generation and attitude control has been conducted. Results from the study indicate that an integrated power/attitude control system (IPACS) can satisfy future mission requirements while providing significant savings in weight, volume, and cost over conventional systems. A failure-mode configuration of an IPACS was applied to a shuttle-launched RAM free-flyer and simulated using make-do hardware linked to a hybrid computer. Data from the simulation runs indicate that control interactions resulting from heavy power demands have minimal effect on system control effectiveness. The system was shown to be capable of meeting the stringent pointing requirements of 1 arc-second while operating under the influence of an orbital disturbance environment and during periods of momentum variations imposed by energy transfer requirements.

  6. C2 Link Security for UAS: Technical Literature Study and Preliminary Functional Requirements. Version 0.9 (Working Draft)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This document provides a study of the technical literature related to Command and Control (C2) link security for Unmanned Aircraft Systems (UAS) for operation in the National Airspace System (NAS). Included is a preliminary set of functional requirements for C2 link security.

  7. COMPARISON OF ALTERNATIVE MANURE MANAGEMENT SYSTEMS: EFFECT ON THE ENVIRONMENT, TOTAL ENERGY REQUIREMENT, NUTRIENT CONSERVATION, CONTRIBUTION TO CORN SILAGE PRODUCTION AND ECONOMICS

    EPA Science Inventory

    This study compares alternative dairy manure management systems operated under full scale commercial conditions. The study investigates weight of manure handled per cow per year, labor and energy requirements, effect on the environment, nutrient conservation, corn silage producti...

  8. Relativism and the social scientific study of medicine.

    PubMed

    Risjord, M

    1993-04-01

    Does the social scientific study of medicine require a commitment to relativism? Relativism claims that some subject (e.g., knowledge claims or moral judgments) is relative to a background (e.g., a culture or conceptual scheme) and that judgments about the subject are incommensurable. Examining the concept of success as it appears in orthodox and nonorthodox medical systems, we see that judgments of success are relative to a background medical system. Relativism requires the social scientific study of medicine to be value free in the sense that a medical system must be described without evaluating its elements. When social scientists do evaluate the successfulness of a nonorthodox medical system, they give a crucial role to the nonorthodox conception of success. This strategy does not vitiate value-freedom and it entails a relativism about success. The social scientific study of medicine, therefore, does require relativism in the form of a relativism about success.

  9. Development of simulation computer complex specification

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The Training Simulation Computer Complex Study was one of three studies contracted in support of preparations for procurement of a shuttle mission simulator for shuttle crew training. The subject study was concerned with definition of the software loads to be imposed on the computer complex to be associated with the shuttle mission simulator and the development of procurement specifications based on the resulting computer requirements. These procurement specifications cover the computer hardware and system software as well as the data conversion equipment required to interface the computer to the simulator hardware. The development of the necessary hardware and software specifications required the execution of a number of related tasks which included, (1) simulation software sizing, (2) computer requirements definition, (3) data conversion equipment requirements definition, (4) system software requirements definition, (5) a simulation management plan, (6) a background survey, and (7) preparation of the specifications.

  10. Transforming Functional Requirements from UML into BPEL to Efficiently Develop SOA-Based Systems

    NASA Astrophysics Data System (ADS)

    Vemulapalli, Anisha; Subramanian, Nary

    The intended behavior of any system such as services, tasks or functions can be captured by functional requirements of the system. As our dependence on online services has grown steadily, the web applications are being developed employing the SOA. BPEL4WS provides a means for expressing functional requirements of an SOA-based system by providing constructs to capture business goals and objectives for the system. In this paper we propose an approach for transforming user-centered requirements captured using UML into a corresponding BPEL specification, where the business processes are captured by means of use-cases from which UML sequence diagrams and activity diagrams are extracted. Subsequently these UML models are mapped to BPEL specifications that capture the essence of the initial business requirements to develop the SOA-based system by employing CASE tools. A student housing system is used as a case study to illustrate this approach and the system is validated using NetBeans.

  11. The Large Synoptic Survey Telescope OCS and TCS models

    NASA Astrophysics Data System (ADS)

    Schumacher, German; Delgado, Francisco

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) is a project envisioned as a system of systems with demanding science, technical, and operational requirements, that must perform as a fully integrated unit. The design and implementation of such a system poses big engineering challenges when performing requirements analysis, detailed interface definitions, operational modes and control strategy studies. The OMG System Modeling Language (SysML) has been selected as the framework for the systems engineering analysis and documentation for the LSST. Models for the overall system architecture and different observatory subsystems have been built describing requirements, structure, interfaces and behavior. In this paper we show the models for the Observatory Control System (OCS) and the Telescope Control System (TCS), and how this methodology has helped in the clarification of the design and requirements. In one common language, the relationships of the OCS, TCS, Camera and Data management subsystems are captured with models of the structure, behavior, requirements and the traceability between them.

  12. Saint Lawrence Seaway Navigation-Aid System Study : Volume II - Appendix B - User's Manual and Documentation of Seaway Capacity and Capacity Analysis Programs

    DOT National Transportation Integrated Search

    1978-09-01

    The requirements for a navigation guidance system which will effect an increase in the ship processing capacity of the Saint Lawrence Seaway (Lake Ontario to Montreal, Quebec) are developed. The requirements include a specification of system position...

  13. Software Requirements

    DTIC Science & Technology

    1990-01-01

    Real-Time Systems Specifications 11 Convenient Auto Rental System Marea82 12 Systems Architecture Marca , D. A., and C. L. McGowan. "Static and...Requirements Marca88 Structured Analysis. Orr’s work is worthy of study Marca , D. A., and C. L. McGowan. SADT: Struc- by the instructor, since it enjoys

  14. Modern "Challenges" in the System of Personnel Training: Standardization and Innovations

    ERIC Educational Resources Information Center

    Zaitseva, Natalia; Dzhandzhugazova, Elena; Bondarchuk, Natalya; Zhukova, Marina

    2017-01-01

    Purpose: The study of the problems hindering improvement of the system of training through standardization of qualification requirements is relevant because, in a globalized system of teaching staff and high rates of migration, not only national but also international requirements for employees should be considered. This increases the…

  15. Remote sensor support requirements for planetary missions

    NASA Technical Reports Server (NTRS)

    Weddell, J. B.; Wheeler, A. E.

    1971-01-01

    The study approach, methods, results, and conclusions of remote sensor support requirements for planetary missions are summarized. Major efforts were made to (1) establish the scientific and engineering knowledge and observation requirements for planetary exploration in the 1975 to 1985 period; (2) define the state of the art and expected development of instrument systems appropriate for sensing planetary environments; (3) establish scaling laws relating performance and support requirements of candidate remote sensor systems; (4) establish fundamental remote sensor system capabilities, limitations, and support requirements during encounter and other dynamical conditions for specific missions; and (5) construct families of candidate remote sensors compatible with selected missions. It was recommended that these data be integrated with earlier results to enhance utility, and that more restrictions be placed on the system.

  16. Verifying Hybrid Systems Modeled as Timed Automata: A Case Study

    DTIC Science & Technology

    1997-03-01

    Introduction Researchers have proposed many innovative formal methods for developing real - time systems [9]. Such methods can give system developers and...customers greater con dence that real - time systems satisfy their requirements, especially their crit- ical requirements. However, applying formal methods...specifying and reasoning about real - time systems that is designed to address these challenging problems. Our approach is to build formal reasoning tools

  17. Future space transportation systems analysis study. Phase 1 extension: Transportation systems reference data, volume 2

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Transportation mass requirements are developed for various mission and transportation modes based on vehicle systems sized to fit the exact needs of each mission. The parametric data used to derive the mass requirements for each mission and transportation mode are presented to enable accommodation of possible changes in mode options or payload definitions. The vehicle sizing and functional requirements used to derive the parametric data are described.

  18. Space Station Systems Analysis Study. Volume 2: Program review report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Major growth options for tended and manned space stations in LEO and GEO are examined including increased orbiter augmentation and habitation requirements. Approaches for providing power supplies, construction aids needed to assemble support platforms, transportation system constraints, and the hardware required for various missions categories are defined. Subsystem requirements are analyzed for structure; flight control; power generation and storage; avionic; life support systems; personnel provisions; and environmental control. Tradeoffs are considered.

  19. Space station onboard propulsion system: Technology study

    NASA Technical Reports Server (NTRS)

    Mcallister, J. G.; Rudland, R. S.; Redd, L. R.; Beekman, D. H.; Cuffin, S. M.; Beer, C. M.; Mccarthy, K. K.

    1987-01-01

    The objective was to prepare for the design of the space station propulsion system. Propulsion system concepts were defined and schematics were developed for the most viable concepts. A dual model bipropellant system was found to deliver the largest amount of payload. However, when resupply is considered, an electrolysis system with 10 percent accumulators requires less resupply propellant, though it is penalized by the amount of time required to fill the accumulators and the power requirements for the electrolyzer. A computer simulation was prepared, which was originally intended to simulate the water electrolysis propulsion system but which was expanded to model other types of systems such as cold gas, monopropellant and bipropellant storable systems.

  20. US computer research networks: Current and future

    NASA Technical Reports Server (NTRS)

    Kratochvil, D.; Sood, D.; Verostko, A.

    1989-01-01

    During the last decade, NASA LeRC's Communication Program has conducted a series of telecommunications forecasting studies to project trends and requirements and to identify critical telecommunications technologies that must be developed to meet future requirements. The Government Networks Division of Contel Federal Systems has assisted NASA in these studies, and the current study builds upon these earlier efforts. The current major thrust of the NASA Communications Program is aimed at developing the high risk, advanced, communications satellite and terminal technologies required to significantly increase the capacity of future communications systems. Also, major new technological, economic, and social-political events and trends are now shaping the communications industry of the future. Therefore, a re-examination of future telecommunications needs and requirements is necessary to enable NASA to make management decisions in its Communications Program and to ensure the proper technologies and systems are addressed. This study, through a series of Task Orders, is helping NASA define the likely communication service needs and requirements of the future and thereby ensuring that the most appropriate technology developments are pursued.

  1. Space transfer vehicle concepts and requirements, volume 2, book 1

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The objective of the systems engineering task was to develop and implement an approach that would generate the required study products as defined by program directives. This product list included a set of system and subsystem requirements, a complete set of optimized trade studies and analyses resulting in a recommended system configuration, and the definition of an integrated system/technology and advanced development growth path. A primary ingredient in the approach was the TQM philosophy stressing job quality from the inception. Included throughout the Systems Engineering, Programmatics, Concepts, Flight Design, and Technology sections are data supporting the original objectives as well as supplemental information resulting from program activities. The primary result of the analyses and studies was the recommendation of a single propulsion stage Lunar Transportation System (LTS) configuration that supports several different operations scenarios with minor element changes. This concept has the potential to support two additional scenarios with complex element changes. The space based LTS concept consists of three primary configurations--Piloted, Reusable Cargo, and Expendable Cargo.

  2. Patient Accounting Systems: Are They Fit with the Users' Requirements?

    PubMed Central

    Ayatollahi, Haleh; Nazemi, Zahra

    2016-01-01

    Objectives A patient accounting system is a subsystem of a hospital information system. This system like other information systems should be carefully designed to be able to meet users' requirements. The main aim of this research was to investigate users' requirements and to determine whether current patient accounting systems meet users' needs or not. Methods This was a survey study, and the participants were the users of six patient accounting systems used in 24 teaching hospitals. A stratified sampling method was used to select the participants (n = 216). The research instruments were a questionnaire and a checklist. The mean value of ≥3 showed the importance of each data element and the capability of the system. Results Generally, the findings showed that the current patient accounting systems had some weaknesses and were able to meet between 70% and 80% of users' requirements. Conclusions The current patient accounting systems need to be improved to be able to meet users' requirements. This approach can also help to provide hospitals with more usable and reliable financial information. PMID:26893945

  3. Xenia Spacecraft Study

    NASA Technical Reports Server (NTRS)

    Hopkins, Randy

    2009-01-01

    This slide presentation reviews the proposed design for the Xenia mission spacecraft. The goal of this study is to perform a mission concept study for the mission. Included in this study are: the overall ground rules and assumptions (GR&A), a mission analysis, the configuration, the mass properties, the guidance, Navigation and control, the proposed avionics, the power system, the thermal protection system, the propulsion system, and the proposed structures. Conclusions from the study indicate that the observatory fits within the Falcon 9 mass and volume envelope for launching from Omelek, the pointing, slow slewing, and fast slewing requirements and the thermal requirements are met.

  4. Evaluation of advanced propulsion options for the next manned transportation system: Propulsion evolution study

    NASA Technical Reports Server (NTRS)

    Spears, L. T.; Kramer, R. D.

    1990-01-01

    The objectives were to examine launch vehicle applications and propulsion requirements for potential future manned space transportation systems and to support planning toward the evolution of Space Shuttle Main Engine (SSME) and Space Transportation Main Engine (STME) engines beyond their current or initial launch vehicle applications. As a basis for examinations of potential future manned launch vehicle applications, we used three classes of manned space transportation concepts currently under study: Space Transportation System Evolution, Personal Launch System (PLS), and Advanced Manned Launch System (AMLS). Tasks included studies of launch vehicle applications and requirements for hydrogen-oxygen rocket engines; the development of suggestions for STME engine evolution beyond the mid-1990's; the development of suggestions for STME evolution beyond the Advanced Launch System (ALS) application; the study of booster propulsion options, including LOX-Hydrocarbon options; the analysis of the prospects and requirements for utilization of a single engine configuration over the full range of vehicle applications, including manned vehicles plus ALS and Shuttle C; and a brief review of on-going and planned LOX-Hydrogen propulsion technology activities.

  5. Economic analysis of solar-heated broiler houses in Arkanasas. [Simulation study of 4 locations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gunderson, R.O.

    A simulation study of the heating energy requirements was made for a prototype broiler house for four locations in Arkansas. In addition, a simulation of the operation of four solar heating systems was made to determine the amount of solar radiation which was available at each location and the portion of the building heat load which could be accounted for by the solar heating systems. The major objectives of this study were: (1) to calculate the heating energy requirements for a broiler house and the supply of solar radiation for four locations in Arkansas: Little Rock, texarkana, Fort Smith andmore » Fayetteville, (2) calculate the auxiliary fuel requirements for each location in the study and for each heating system under examination, (3) compare the cost of a conventional heating system versus the cost of a solar-assisted heating system, and (4) examine the relative financial position of the broiler enterprise amine the relative financial position of the broiler enterprise for each heating system under a variety of economic assumptions.« less

  6. Economics of ion propulsion for large space systems

    NASA Technical Reports Server (NTRS)

    Masek, T. D.; Ward, J. W.; Rawlin, V. K.

    1978-01-01

    This study of advanced electrostatic ion thrusters for space propulsion was initiated to determine the suitability of the baseline 30-cm thruster for future missions and to identify other thruster concepts that would better satisfy mission requirements. The general scope of the study was to review mission requirements, select thruster designs to meet these requirements, assess the associated thruster technology requirements, and recommend short- and long-term technology directions that would support future thruster needs. Preliminary design concepts for several advanced thrusters were developed to assess the potential practical difficulties of a new design. This study produced useful general methodologies for assessing both planetary and earth orbit missions. For planetary missions, the assessment is in terms of payload performance as a function of propulsion system technology level. For earth orbit missions, the assessment is made on the basis of cost (cost sensitivity to propulsion system technology level).

  7. Time frequency requirements for radio interferometric earth physics

    NASA Technical Reports Server (NTRS)

    Thomas, J. B.; Fliegel, H. F.

    1973-01-01

    Two systems of VLBI (Very Long Baseline Interferometry) are now applicable to earth physics: an intercontinental baseline system using antennas of the NASA Deep Space Network, now observing at one-month intervals to determine UTI for spacecraft navigation; and a shorter baseline system called ARIES (Astronomical Radio Interferometric Earth Surveying), to be used to measure crustal movement in California for earthquake hazards estimation. On the basis of experience with the existing DSN system, a careful study has been made to estimate the time and frequency requirements of both the improved intercontinental system and of ARIES. Requirements for the two systems are compared and contrasted.

  8. Energy Efficient Engine: Control system preliminary definition report

    NASA Technical Reports Server (NTRS)

    Howe, David C.

    1986-01-01

    The object of the Control Preliminary Definition Program was to define a preliminary control system concept as a part of the Energy Efficient Engine program. The program was limited to a conceptual definition of a full authority digital electronic control system. System requirements were determined and a control system was conceptually defined to these requirements. Areas requiring technological development were identified and a plan was established for implementing the identified technological features, including a control technology demonstration. A significant element of this program was a study of the potential benefits of closed-loop active clearance control, along with laboratory tests of candidate clearance sensor elements for a closed loop system.

  9. Suitability of customer relationship management systems for the management of study participants in biomedical research.

    PubMed

    Schwanke, J; Rienhoff, O; Schulze, T G; Nussbeck, S Y

    2013-01-01

    Longitudinal biomedical research projects study patients or participants over a course of time. No IT solution is known that can manage study participants, enhance quality of data, support re-contacting of participants, plan study visits, and keep track of informed consent procedures and recruitments that may be subject to change over time. In business settings management of personal is one of the major aspects of customer relationship management systems (CRMS). To evaluate whether CRMS are suitable IT solutions for study participant management in biomedical research. Three boards of experts in the field of biomedical research were consulted to get an insight into recent IT developments regarding study participant management systems (SPMS). Subsequently, a requirements analysis was performed with stakeholders of a major biomedical research project. The successive suitability evaluation was based on the comparison of the identified requirements with the features of six CRMS. Independently of each other, the interviewed expert boards confirmed that there is no generic IT solution for the management of participants. Sixty-four requirements were identified and prioritized in a requirements analysis. The best CRMS was able to fulfill forty-two of these requirements. The non-fulfilled requirements demand an adaption of the CRMS, consuming time and resources, reducing the update compatibility, the system's suitability, and the security of the CRMS. A specific solution for the SPMS is favored instead of a generic and commercially-oriented CRMS. Therefore, the development of a small and specific SPMS solution was commenced and is currently on the way to completion.

  10. Space Shuttle interactive meteorological data system study

    NASA Technical Reports Server (NTRS)

    Young, J. T.; Fox, R. J.; Benson, J. M.; Rueden, J. P.; Oehlkers, R. A.

    1985-01-01

    Although focused toward the operational meteorological support review and definition of an operational meteorological interactive data display systems (MIDDS) requirements for the Space Meteorology Support Group at NASA/Johnson Space Center, the total operational meteorological support requirements and a systems concept for the MIDDS network integration of NASA and Air Force elements to support the National Space Transportation System are also addressed.

  11. Orbital Spacecraft Consumables Resupply System (OSCRS). Volume 4: Extended study results Part 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The objectives consisted of three major tasks. The first was to establish the definition of Space Station and Orbital Maneuvering Vehicle (OMV) user requirements and interfaces and to evaluate system requirements of a water tanker to be used at the station. The second task is to conduct trade studies of system requirements, hardware/software, and operations to evaluate the effect of automatic operation at the station or remote from the station in consonance with the OMV. The last task is to evaluate automatic refueling concepts and to evaluate the impact to Orbital Spacecraft Consumable Resupply System (OSCRS) concept/design to use expendable launch vehicles (ELV) to place the tank into orbit. Progress in each area is discussed.

  12. User's manual for the Shuttle Electric Power System analysis computer program (SEPS), volume 2 of program documentation

    NASA Technical Reports Server (NTRS)

    Bains, R. W.; Herwig, H. A.; Luedeman, J. K.; Torina, E. M.

    1974-01-01

    The Shuttle Electric Power System Analysis SEPS computer program which performs detailed load analysis including predicting energy demands and consumables requirements of the shuttle electric power system along with parameteric and special case studies on the shuttle electric power system is described. The functional flow diagram of the SEPS program is presented along with data base requirements and formats, procedure and activity definitions, and mission timeline input formats. Distribution circuit input and fixed data requirements are included. Run procedures and deck setups are described.

  13. Stakeholder Alignment for Requirements in GEOValue

    NASA Astrophysics Data System (ADS)

    Cutcher-Gershenfeld, J.; King, J. L.

    2016-12-01

    Observation systems that collect information on environmental parameters relevant to biological and physical earth resources provide value. This has been demonstrated so many times in so many ways that it is not worth deliberating. Earlier projects for research (whether it is possible to do this or that), or for "dual use," typically involving defense, have been successful. Wealthy parties have built their own systems. Less wealthy parties seek to sustain the systems they have built. The history of systems suggests that "requirements" will be the next step. The objective is to maximize the "return" on the substantial investment required for construction, deployment, maintenance and renewal of observation systems. Stakeholders and their interests are assessed to construct the requirements from which specifications are built. Specifications drive procurement, and procurement produces built systems. Complicated (e.g. space-based) systems have long times between requirements analysis and deployment. It all depends on getting the requirements right, which depends on understanding stakeholders and requirements. And this is where things get complicated. Stakeholders and interests change, sometimes rapidly, as what is possible is altered. It becomes increasingly difficult to achieve stakeholder alignment required for effective management of constituent politics at the heart of any expensive endeavor. This paper presents results from a major study of stakeholder alignment in the Earth Sciences, focused especially on EarthCube.

  14. Variable/Multispeed Rotorcraft Drive System Concepts

    NASA Technical Reports Server (NTRS)

    Stevens, Mark A.; Handschuh, Robert F.; Lewicki, David G.

    2009-01-01

    Several recent studies for advanced rotorcraft have identified the need for variable, or multispeed-capable rotors. A speed change of up to 50 percent has been proposed for future rotorcraft to improve vehicle performance. Varying rotor speed during flight not only requires a rotor capable of performing effectively over the extended operation speed and load range, but also requires an advanced propulsion system to provide the required speed changes. A study has been completed, which investigated possible drive system arrangements to accommodate up to the 50 percent speed change. These concepts are presented. The most promising configurations are identified and will be developed for future validation testing.

  15. Advanced life support study

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Summary reports on each of the eight tasks undertaken by this contract are given. Discussed here is an evaluation of a Closed Ecological Life Support System (CELSS), including modeling and analysis of Physical/Chemical Closed Loop Life Support (P/C CLLS); the Environmental Control and Life Support Systems (ECLSS) evolution - Intermodule Ventilation study; advanced technologies interface requirements relative to ECLSS; an ECLSS resupply analysis; the ECLSS module addition relocation systems engineering analysis; an ECLSS cost/benefit analysis to identify rack-level interface requirements of the alternate technologies evaluated in the ventilation study, with a comparison of these with the rack level interface requirements for the baseline technologies; advanced instrumentation - technology database enhancement; and a clean room survey and assessment of various ECLSS evaluation options for different growth scenarios.

  16. Information transfer satellite concept study. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    Bergin, P.; Kincade, C.; Kurpiewski, D.; Leinhaupel, F.; Millican, F.; Onstad, R.

    1971-01-01

    The ITS concept study is preceded by two requirements studies whose primary objectives are to identify viable demands and to develop the functional requirements associated with these demands. In addition to continuing this basic activity the ITS concept study objectives are to: (1) develop tools and techniques for planning advanced information transfer satellite communications systems, and to (2) select viable systems for further analysis both in their near-term and in the far-term aspects.

  17. Space Tug Docking Study. Volume 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Results of a detailed systems analysis of the entire rendezvous and docking operation to be performed by the all-up space tug are presented. Specific areas investigated include: generating of operational requirements and a data base of candidate operational techniques and subsystem mechanizations; selection and ranking of integrated system designs capable of meeting the requirements generated; and definition of this simulation/demonstration program required to select and prove the most effective manual, autonomous, and hybrid rendezvous and docking systems.

  18. The reactive bed plasma system for contamination control

    NASA Technical Reports Server (NTRS)

    Birmingham, Joseph G.; Moore, Robert R.; Perry, Tony R.

    1990-01-01

    The contamination control capabilities of the Reactive Bed Plasma (RBP) system is described by delineating the results of toxic chemical composition studies, aerosol filtration work, and other testing. The RBP system has demonstrated its capabilities to decompose toxic materials and process hazardous aerosols. The post-treatment requirements for the reaction products have possible solutions. Although additional work is required to meet NASA requirements, the RBP may be able to meet contamination control problems aboard the Space Station.

  19. Ground Systems Development Environment (GSDE) interface requirements and prototyping plan

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Philips, John; Bassman, Mitchell; Williams, C.

    1990-01-01

    This report describes the data collection and requirements analysis effort of the Ground System Development Environment (GSDE) Interface Requirements study. It identifies potential problems in the interfaces among applications and processors in the heterogeneous systems that comprises the GSDE. It describes possible strategies for addressing those problems. It also identifies areas for further research and prototyping to demonstrate the capabilities and feasibility of those strategies and defines a plan for building the necessary software prototypes.

  20. Library Specifications for a New Circulation System for Concordia University Libraries.

    ERIC Educational Resources Information Center

    Tallon, James

    This study of library requirements for a new circulation system is organized into three sections: (1) items required for initial implementation in July 1982; (2) items relating to notice generation and activity statistics, with implementation expected by fall 1982; and (3) items provided in the system as initially implemented, with additional…

  1. 43 CFR 404.35 - Is there a different non-Federal cost-share requirement for feasibility studies that involve a...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-share requirement for feasibility studies that involve a community greater than 50,000 inhabitants? 404... non-Federal cost-share requirement for feasibility studies that involve a community greater than 50,000 inhabitants? Yes. If the feasibility study involves a rural water supply system that will serve a...

  2. Space station system analysis study. Part 3: Documentation. Volume 2: Technical report. [structural design and construction

    NASA Technical Reports Server (NTRS)

    1977-01-01

    An analysis of construction operation is presented as well as power system sizing requirements. Mission hardware requirements are reviewed in detail. Space construction base and design configurations are also examined.

  3. Study of power management technology for orbital multi-100KWe applications. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    Mildice, J. W.

    1980-01-01

    The preliminary requirements and technology advances required for cost effective space power management systems for multi-100 kilowatt requirements were identified. System requirements were defined by establishing a baseline space platform in the 250 KE KWe range and examining typical user loads and interfaces. The most critical design parameters identified for detailed analysis include: increased distribution voltages and space plasma losses, the choice between ac and dc distribution systems, shuttle servicing effects on reliability, life cycle costs, and frequency impacts to power management system and payload systems for AC transmission. The first choice for a power management system for this kind of application and size range is a hybrid ac/dc combination with the following major features: modular design and construction-sized minimum weight/life cycle cost; high voltage transmission (100 Vac RMS); medium voltage array or = 440 Vdc); resonant inversion; transformer rotary joint; high frequency power transmission line or = 20 KHz); energy storage on array side or rotary joint; fully redundant; and 10 year life with minimal replacement and repair.

  4. L-Band Digital Aeronautical Communications System Engineering - Concepts of Use, Systems Performance, Requirements, and Architectures

    NASA Technical Reports Server (NTRS)

    Zelkin, Natalie; Henriksen, Stephen

    2010-01-01

    This NASA Contractor Report summarizes and documents the work performed to develop concepts of use (ConUse) and high-level system requirements and architecture for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. This work was completed as a follow-on to the technology assessment conducted by NASA Glenn Research Center and ITT for the Future Communications Study (FCS). ITT assessed air-to-ground (A/G) communications concepts of use and operations presented in relevant NAS-level, international, and NAS-system-level documents to derive the appropriate ConUse relevant to potential A/G communications applications and services for domestic continental airspace. ITT also leveraged prior concepts of use developed during the earlier phases of the FCS. A middle-out functional architecture was adopted by merging the functional system requirements identified in the bottom-up assessment of existing requirements with those derived as a result of the top-down analysis of ConUse and higher level functional requirements. Initial end-to-end system performance requirements were derived to define system capabilities based on the functional requirements and on NAS-SR-1000 and the Operational Performance Assessment conducted as part of the COCR. A high-level notional architecture of the L-DACS supporting A/G communication was derived from the functional architecture and requirements.

  5. Modular transportable superconducting magnetic energy systems

    NASA Technical Reports Server (NTRS)

    Lieurance, Dennis; Kimball, Foster; Rix, Craig

    1995-01-01

    Design and cost studies were performed for the magnet components of mid-size (1-5 MWh), cold supported SMES systems using alternative configurations. The configurations studied included solenoid magnets, which required onsite assembly of the magnet system, and toroid and racetrack configurations which consisted of factory assembled modules. For each configuration, design concepts and cost information were developed for the major features of the magnet system including the conductor, electrical insulation, and structure. These studies showed that for mid-size systems, the costs of solenoid and toroid magnet configurations are comparable and that the specific configuration to be used for a given application should be based upon customer requirements such as limiting stray fields or minimizing risks in development or construction.

  6. ERTS direct readout ground station study

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A system configuration which provides for a wide variety of user requirements is described. Two distinct user types are considered and optimized configurations are provided. Independent satellite transmission systems allow simultaneous signal transmission to Regional Collection Centers via a high data rate channel and to local users who require near real time consumption of lower rate data. In order to maximize the ultimate utility of this study effort, a parametric system description is given such that in essence a shopping list is provided. To achieve these results, it was necessary to consider all technical disciplines associated with high resolution satellite imaging systems including signal processing, modulation and coding, recording, and display techniques. A total systems study was performed.

  7. Modular transportable superconducting magnetic energy systems

    NASA Astrophysics Data System (ADS)

    Lieurance, Dennis; Kimball, Foster; Rix, Craig

    1995-04-01

    Design and cost studies were performed for the magnet components of mid-size (1-5 MWh), cold supported SMES systems using alternative configurations. The configurations studied included solenoid magnets, which required onsite assembly of the magnet system, and toroid and racetrack configurations which consisted of factory assembled modules. For each configuration, design concepts and cost information were developed for the major features of the magnet system including the conductor, electrical insulation, and structure. These studies showed that for mid-size systems, the costs of solenoid and toroid magnet configurations are comparable and that the specific configuration to be used for a given application should be based upon customer requirements such as limiting stray fields or minimizing risks in development or construction.

  8. Redundant actuator development study. [flight control systems for supersonic transport aircraft

    NASA Technical Reports Server (NTRS)

    Ryder, D. R.

    1973-01-01

    Current and past supersonic transport configurations are reviewed to assess redundancy requirements for future airplane control systems. Secondary actuators used in stability augmentation systems will probably be the most critical actuator application and require the highest level of redundancy. Two methods of actuator redundancy mechanization have been recommended for further study. Math models of the recommended systems have been developed for use in future computer simulations. A long range plan has been formulated for actuator hardware development and testing in conjunction with the NASA Flight Simulator for Advanced Aircraft.

  9. First steps to lunar manufacturing: Results of the 1988 Space Studies Institute Lunar Systems Workshop

    NASA Technical Reports Server (NTRS)

    Maryniak, Gregg E.

    1992-01-01

    Prior studies by NASA and the Space Studies Institute have looked at the infrastructure required for the construction of solar power satellites (SPS) and other valuable large space systems from lunar materials. This paper discusses the results of a Lunar Systems Workshop conducted in January 1988. The workshop identified components of the infrastructure that could be implemented in the near future to create a revenue stream. These revenues could then be used to 'bootstrap' the additional elements required to begin the commercial use of nonterrestrial materials.

  10. Nuclear Thermal Propulsion Mars Mission Systems Analysis and Requirements Definition

    NASA Technical Reports Server (NTRS)

    Mulqueen, Jack; Chiroux, Robert C.; Thomas, Dan; Crane, Tracie

    2007-01-01

    This paper describes the Mars transportation vehicle design concepts developed by the Marshall Space Flight Center (MSFC) Advanced Concepts Office. These vehicle design concepts provide an indication of the most demanding and least demanding potential requirements for nuclear thermal propulsion systems for human Mars exploration missions from years 2025 to 2035. Vehicle concept options vary from large "all-up" vehicle configurations that would transport all of the elements for a Mars mission on one vehicle. to "split" mission vehicle configurations that would consist of separate smaller vehicles that would transport cargo elements and human crew elements to Mars separately. Parametric trades and sensitivity studies show NTP stage and engine design options that provide the best balanced set of metrics based on safety, reliability, performance, cost and mission objectives. Trade studies include the sensitivity of vehicle performance to nuclear engine characteristics such as thrust, specific impulse and nuclear reactor type. Tbe associated system requirements are aligned with the NASA Exploration Systems Mission Directorate (ESMD) Reference Mars mission as described in the Explorations Systems Architecture Study (ESAS) report. The focused trade studies include a detailed analysis of nuclear engine radiation shield requirements for human missions and analysis of nuclear thermal engine design options for the ESAS reference mission.

  11. Design and demonstration of a storage assisted air conditioning system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Avril, F.; Irvine, T.F.

    1982-04-01

    The report describes the design and demonstration of a storage-assisted air conditioning system for residential central air conditioning applications. The system was designed to reduce peak air conditioning loads by storing coolness to fulfill daytime air conditioning requirements. The system design analyses, as well as performance data obtained from a residential installation on Long Island, are presented, along with an economic evaluation of the system. The results of the study indicate that such a system can reduce air conditioning peak load requirements while maintaining house temperature and humidity within prescribed limits. However, further system optimization is required, as well asmore » either equipment costs reduction or increased incentives, to make this system economically attractive for use in New York State.« less

  12. Space transfer vehicle concepts and requirements. Volume 3: Program cost estimates

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Space Transfer Vehicle (STV) Concepts and Requirements Study has been an eighteen-month study effort to develop and analyze concepts for a family of vehicles to evolve from an initial STV system into a Lunar Transportation System (LTS) for use with the Heavy Lift Launch Vehicle (HLLV). The study defined vehicle configurations, facility concepts, and ground and flight operations concepts. This volume reports the program cost estimates results for this portion of the study. The STV Reference Concept described within this document provides a complete LTS system that performs both cargo and piloted Lunar missions.

  13. Space-based solar power conversion and delivery systems (study), engineering analysis

    NASA Technical Reports Server (NTRS)

    Nathan, C. A.

    1975-01-01

    A systems analysis of synchronous, orbit-based power generation and relay systems that could be operational in the 1990's is described along with a comparison with earth-based systems to be operational in the same time frame. Operational and economic requirements for the orbiting systems and near term research activities which will be required to assure feasibility, development, launch and operational capabilities of such systems in the post- 1990 time frame are examined.

  14. Conflict Probe Concepts Analysis in Support of Free Flight

    NASA Technical Reports Server (NTRS)

    Warren, Anthony W.; Schwab, Robert W.; Geels, Timothy J.; Shakarian, Arek

    1997-01-01

    This study develops an operational concept and requirements for en route Free Flight using a simulation of the Cleveland Air Route Traffic Control Center, and develops requirements for an automated conflict probe for use in the Air Traffic Control (ATC) Centers. In this paper, we present the results of simulation studies and summarize implementation concepts and infrastructure requirements to transition from the current air traffic control system to mature Free Right. The transition path to Free Flight envisioned in this paper assumes an orderly development of communications, navigation, and surveillance (CNS) technologies based on results from our simulation studies. The main purpose of this study is to provide an overall context and methodology for evaluating airborne and ground-based requirements for cooperative development of the future ATC system.

  15. Rural freight rail and multimodal transportation improvements - the Upper Peninsula of Michigan.

    DOT National Transportation Integrated Search

    2014-07-01

    Affordable freight transportation is a requirement for survival for rural industries, and in many : cases requires the presence of freight rail systems. This study investigated the transportation : system in the Upper Peninsula of Michigan (U.P.). Th...

  16. Application of the HARDMAN methodology to the single channel ground-airborne radio system (SINCGARS)

    NASA Astrophysics Data System (ADS)

    Balcom, J.; Park, J.; Toomer, L.; Feng, T.

    1984-12-01

    The HARDMAN methodology is designed to assess the human resource requirements early in the weapon system acquisition process. In this case, the methodology was applied to the family of radios known as SINCGARS (Single Channel Ground-Airborne Radio System). At the time of the study, SINCGARS was approaching the Full-Scale Development phase, with 2 contractors in competition. Their proposed systems were compared with a composite baseline comparison (reference) system. The systems' manpower, personnel and training requirements were compared. Based on RAM data, the contractors' MPT figures showed a significant reduction from the figures derived for the baseline comparison system. Differences between the two contractors were relatively small. Impact and some tradeoff analyses were hindered by data access problems. Tactical radios, manpower and personnel requirements analysis, impact and tradeoff analysis, human resource sensitivity, training requirements analysis, human resources in LCSMM, and logistics analyses are discussed.

  17. Definition study of land/sea civil user navigational location monitoring systems for NAVSTAR GPS: User requirements and systems concepts

    NASA Technical Reports Server (NTRS)

    Devito, D. M.

    1981-01-01

    A low-cost GPS civil-user mobile terminal whose purchase cost is substantially an order of magnitude less than estimates for the military counterpart is considered with focus on ground station requirements for position monitoring of civil users requiring this capability and the civil user navigation and location-monitoring requirements. Existing survey literature was examined to ascertain the potential users of a low-cost NAVSTAR receiver and to estimate their number, function, and accuracy requirements. System concepts are defined for low cost user equipments for in-situ navigation and the retransmission of low data rate positioning data via a geostationary satellite to a central computing facility.

  18. Evolution of safety-critical requirements post-launch

    NASA Technical Reports Server (NTRS)

    Lutz, R. R.; Mikulski, I. C.

    2001-01-01

    This paper reports the results of a small study of requirements changes to the onboard software of three spacecraft subsequent to launch. Only those requirement changes that resulted from post-launch anoma-lies (i.e., during operations) were of interest here, since the goal was to better understand the relation-ship between critical anomalies during operations and how safety-critical requirements evolve. The results of the study were surprising in that anomaly-driven, post-launch requirements changes were rarely due to previous requirements having been incorrect. Instead, changes involved new requirements (1) for the software to handle rare events or (2) for the software to compensate for hardware failures or limitations. The prevalence of new requirements as a result of post-launch anomalies suggests a need for increased requirements-engineering support of maintenance activities in these systems. The results also confirm both the difficulty and the benefits of pursuing requirements completeness, especially in terms of fault tolerance, during development of critical systems.

  19. Cost Savings Associated with the Adoption of a Cloud Computing Data Transfer System for Trauma Patients.

    PubMed

    Feeney, James M; Montgomery, Stephanie C; Wolf, Laura; Jayaraman, Vijay; Twohig, Michael

    2016-09-01

    Among transferred trauma patients, challenges with the transfer of radiographic studies include problems loading or viewing the studies at the receiving hospitals, and problems manipulating, reconstructing, or evalu- ating the transferred images. Cloud-based image transfer systems may address some ofthese problems. We reviewed the charts of patients trans- ferred during one year surrounding the adoption of a cloud computing data transfer system. We compared the rates of repeat imaging before (precloud) and af- ter (postcloud) the adoption of the cloud-based data transfer system. During the precloud period, 28 out of 100 patients required 90 repeat studies. With the cloud computing transfer system in place, three out of 134 patients required seven repeat films. There was a statistically significant decrease in the proportion of patients requiring repeat films (28% to 2.2%, P < .0001). Based on an annualized volume of 200 trauma patient transfers, the cost savings estimated using three methods of cost analysis, is between $30,272 and $192,453.

  20. Advanced Extravehicular Protective System (AEPS) study

    NASA Technical Reports Server (NTRS)

    Williams, J. L.; Webbon, B. W.; Copeland, R. J.

    1972-01-01

    A summary is presented of Advanced Extravehicular Protective Systems (AEPS) for the future missions beyond Skylab in earth orbit, on the lunar surface, and on the Martian surface. The study concentrated on the origination of regenerable life support concepts for use in portable extravehicular protective systems, and included evaluation and comparison with expendable systems, and selection of life support subsystems. The study was conducted in two phases. In the first phase, subsystem concepts for performing life support functions in AEPS which are regenerable or partially regenerable were originated, and in addition, expendable subsystems were considered. Parametric data for each subsystem concept were evolved including subsystem weight and volume, power requirement, thermal control requirement; base regeneration equipment weight and volume, requirement. The second phase involved an evaluation of the impact of safety considerations involving redundant and/or backup systems on the selection of the regenerable life support subsystems. In addition, the impact of the space shuttle program on regenerable life support subsystem development was investigated.

  1. Space shuttle EVA/IVA support equipment requirements study. Volume 1: Final summary report

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A study was conducted to determine the support equipment requirements for space shuttle intravehicular and extravehicular activities. The subjects investigated are; (1) EVA/IVA task identification and analysis,. (2) primary life support system, (3) emergency life support system, (4) pressure suit assembly, (5) restraints, (6) work site provision, (7) emergency internal vehicular emergencies, and (8) vehicular interfaces.

  2. SERT C project study

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The SERT C (Space Electric Rocket Test - C) project study defines a spacecraft mission that would demonstrate the technology readiness of ion thruster systems for primary propulsion and station keeping applications. As a low cost precursor, SERT C develops the components and systems required for subsequent Solar Electric Propulsion (SEP) applications. The SERT C mission requirements and preliminary spacecraft and subsystem design are described.

  3. CEOS SEO and GISS Meeting

    NASA Technical Reports Server (NTRS)

    Killough, Brian; Stover, Shelley

    2008-01-01

    The Committee on Earth Observation Satellites (CEOS) provides a brief to the Goddard Institute for Space Studies (GISS) regarding the CEOS Systems Engineering Office (SEO) and current work on climate requirements and analysis. A "system framework" is provided for the Global Earth Observation System of Systems (GEOSS). SEO climate-related tasks are outlined including the assessment of essential climate variable (ECV) parameters, use of the "systems framework" to determine relevant informational products and science models and the performance of assessments and gap analyses of measurements and missions for each ECV. Climate requirements, including instruments and missions, measurements, knowledge and models, and decision makers, are also outlined. These requirements would establish traceability from instruments to products and services allowing for benefit evaluation of instruments and measurements. Additionally, traceable climate requirements would provide a better understanding of global climate models.

  4. Design concepts and cost studies for magnetic suspension and balance systems. [wind tunnel apparatus

    NASA Technical Reports Server (NTRS)

    Bloom, H. L.

    1982-01-01

    The application of superconducting magnets for suspension and balance of wind tunnel models was studied. Conceptual designs are presented for magnetic suspension and balance system (MSBS) configurations compatible with three high Reynolds number cases representing specified combinations of test conditions and model sizes. Concepts in general met initially specified performance requirements such as duty cycle, force and moment levels, model angular displacement and positioning accuracy with nominal design requirements for support subsystems. Other performance requirements, such as forced model sinusoidal oscillations, and control force magnitude and frequency, were modified so as to alleviate the magnitude of magnet, power, and cryogenic design requirements.

  5. High Altitude Long Endurance UAV Analysis of Alternatives and Technology Requirements Development

    NASA Technical Reports Server (NTRS)

    Nickol, Craig L.; Guynn, Mark D.; Kohout, Lisa L.; Ozoroski, Thomas A.

    2007-01-01

    An Analysis of Alternatives and a Technology Requirements Study were conducted for two mission areas utilizing various types of High Altitude Long Endurance (HALE) Unmanned Aerial Vehicles (UAV). A hurricane science mission and a communications relay mission provided air vehicle requirements which were used to derive sixteen potential HALE UAV configurations, including heavier-than-air (HTA) and lighter-than-air (LTA) concepts with both consumable fuel and solar regenerative propulsion systems. A HTA diesel-fueled wing-body-tail configuration emerged as the preferred concept given near-term technology constraints. The cost effectiveness analysis showed that simply maximizing vehicle endurance can be a sub-optimum system solution. In addition, the HTA solar regenerative configuration was utilized to perform both a mission requirements study and a technology development study. Given near-term technology constraints, the solar regenerative powered vehicle was limited to operations during the long days and short nights at higher latitudes during the summer months. Technology improvements are required in energy storage system specific energy and solar cell efficiency, along with airframe drag and mass reductions to enable the solar regenerative vehicle to meet the full mission requirements.

  6. Consolidated Ground Segment Requirements for a UHF Radar for the ESSAS

    NASA Astrophysics Data System (ADS)

    Muller, Florent; Vera, Juan

    2009-03-01

    ESA has launched a nine months long study to define the requirements associated to the ground segment of a UHF (300-3000 MHz) radar system. The study has been awarded in open competition to a consortium led by Onera, associated to the Spanish companies Indra and its sub-contractor Deimos. After a phase of consolidation of the requirements, different monostatic and bistatic concepts of radars will be proposed and evaluated. Two concepts will be selected for further design studies. ESA will then select the best one, for detailed design as well as cost and performance evaluation. The aim of this paper is to present the results of the first phase of the study concerning the consolidation of the radar system requirements. The main mission for the system is to be able to build and maintain a catalogue of the objects in low Earth orbit (apogee lower than 2000km) in an autonomous way, for different sizes of objects, depending on the future successive development phases of the project. The final step must give the capability of detecting and tracking 10cm objects, with a possible upgrade to 5 cm objects. A demonstration phase must be defined for 1 m objects. These different steps will be considered during all the phases of the study. Taking this mission and the different steps of the study as a starting point, the first phase will define a set of requirements for the radar system. It was finished at the end of January 2009. First part will describe the constraints derived from the targets and their environment. Orbiting objects have a given distribution in space, and their observability and detectability are based on it. It is also related to the location of the radar system But they are also dependant on the natural propagation phenomenon, especially ionospheric issues, and the characteristics of the objects. Second part will focus on the mission itself. To carry out the mission, objects must be detected and tracked regularly to refresh the associated orbital parameters. In order to be able to examine different kind of concepts, trade-offs must be possible. Degrees of freedom must be defined between accuracy and refreshment rate of the measurements, between survey zone and tracking zone (if different).Third part will deal with the requirements derived from various constraints. Logistical issues depend on the required availability of the system. People and environment security is also a big concern, related to maximal emitted power. There are current known technical limits (regarding current existing radars) that may need to be pushed: peak power, surface emitted power density, etc.Traceability of derived consolidated requirements is also a key driver of this part of the study. A methodology for traceability of requirements and tests will be defined. It shall be extendable to the next phases of the current study and further studies also. All the requirements will be written in accordance to this methodology.

  7. Automated personnel data base system specifications, Task V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.

    1978-09-01

    This document is the General Research Corporation report on Task V of a study for the Office of Inspection and Enforcement of the Nuclear Regulatory Commission (NRC/IE). The full title of this study is ''Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.'' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirementsmore » Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.« less

  8. Study of Alternate Space Shuttle Concepts. Volume 2. Part 1: Concept Analysis and Definition

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Three different space shuttle systems have been defined and analyzed. The first is a stage-and-one-half system optimized to meet program requirements. The second is a two-stage, fully reusable system also designed to meet program requirements. The third is a convertible system which operates initially as a stage-and-one-half system and is subsequently converted to a two-stage, fully reusable system by reconfiguration of the orbiter vehicle and development of a booster vehicle. The design and performance of this third system must necessarily be compromised somewhat to facilitate the conversion. For each system, the applicable requirements, ground rules, and assumptions are defined. The characteristics of each system are listed and a detailed description and analysis of the system are presented. Finally, a cost analysis for the system is given.

  9. Use of a Passive Reaction Wheel Jitter Isolation System to Meet the Advanced X-Ray Astrophysics Facility Imaging Performance Requirements

    NASA Technical Reports Server (NTRS)

    Pendergast, Karl J.; Schauwecker, Christopher J.

    1998-01-01

    Third in the series of NASA great observatories, the Advanced X-Ray Astrophysics Facility (AXAF) is scheduled for launch from the Space Shuttle in November of 1998. Following in the path of the Hubble Space Telescope and the Compton Gamma Ray Observatory, this observatory will image light at X-ray wavelengths, facilitating the detailed study of such phenomena as supernovae and quasars. The AXAF project is sponsored by the Marshall Space Flight Center in Huntsville, Alabama. Because of exacting requirements on the performance of the AXAF optical system, it was necessary to reduce the transmission of reaction wheel jitter disturbances to the observatory. This reduction was accomplished via use of a passive mechanical isolation system to interface the reaction wheels with the spacecraft central structure. In addition to presenting a description of the spacecraft, the isolation system, and the key image quality requirement flowdown, this paper details the analyses performed in support of system-level imaging performance requirement verification. These analyses include the identification of system-level requirement suballocations, quantification of imaging and pointing performance, and formulation of unit-level isolation system transmissibility requirements. Given in comparison to the non-isolated system imaging performance, the results of these analyses clearly illustrate the effectiveness of an innovative reaction wheel passive isolation system.

  10. Waste Handeling Building Conceptual Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G.W. Rowe

    2000-11-06

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable,more » and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system.« less

  11. SPS attitude control and stationkeeping: Requirements and tradeoffs

    NASA Technical Reports Server (NTRS)

    Oglevie, R. E.

    1980-01-01

    The dominant control requirements of solar power satellites change appreciably relative to small contemporary spacecraft. Trade studies and analyses illustrated preferred control approaches. It was found that the geosynchronous equatorial orbit is preferred over the alternative orbits considered, that the solar pressure orbit perturbation dominates stationkeeping propulsion requirements and that a combined AC and SK system using ion electric propulsion can satisfy the attitude control requirements. It was also found that control system/structural dynamic interaction stability can be obtained through frequency separation with reasonable structural dynamic requirements and simplify spacecraft design.

  12. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix E: EOS program supporting system. Part 1: System trade studies no. 1 through 8

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The design requirements and associated cost impacts for using the space shuttle to deliver the Earth Observatory Satellite (EOS) are identified. The additional impact of achieving full compatibility for resupply and retrieval is considered. Based on the results of the analysis, it is concluded that the EOS-Shuttle compatibility can be realized with reasonable spacecraft weight and cost penalties. Inherent space shuttle capabilities are adequate to meet the requirements of all missions except E and F. Mission E (Tiros 0) may be accommodated by either an EOS orbit transfer capability or a tug. The tug appears to be the only viable approach to satisfying the mission F (SEOS) requirements.

  13. Satellite voice broadcast. Volume 2: System study

    NASA Technical Reports Server (NTRS)

    Bachtell, E. E.; Bettadapur, S. S.; Coyner, J. V.; Farrell, C. E.

    1985-01-01

    The Technical Volume of the Satellite Broadcast System Study is presented. Designs are synthesized for direct sound broadcast satellite systems for HF-, VHF-, L-, and Ku-bands. Methods are developed and used to predict satellite weight, volume, and RF performance for the various concepts considered. Cost and schedule risk assessments are performed to predict time and cost required to implement selected concepts. Technology assessments and tradeoffs are made to identify critical enabling technologies that require development to bring technical risk to acceptable levels for full scale development.

  14. Design and implementation of an audit trail in compliance with US regulations.

    PubMed

    Jiang, Keyuan; Cao, Xiang

    2011-10-01

    Audit trails have been used widely to ensure quality of study data and have been implemented in computerized clinical trials data systems. Increasingly, there is a need to audit access to study participant identifiable information to provide assurance that study participant privacy is protected and confidentiality is maintained. In the United States, several federal regulations specify how the audit trail function should be implemented. To describe the development and implementation of a comprehensive audit trail system that meets the regulatory requirements of assuring data quality and integrity and protecting participant privacy and that is also easy to implement and maintain. The audit trail system was designed and developed after we examined regulatory requirements, data access methods, prevailing application architecture, and good security practices. Our comprehensive audit trail system was developed and implemented at the database level using a commercially available database management software product. It captures both data access and data changes with the correct user identifier. Documentation of access is initiated automatically in response to either data retrieval or data change at the database level. Currently, our system has been implemented only on one commercial database management system. Although our audit trail algorithm does not allow for logging aggregate operations, aggregation does not reveal sensitive private participant information. Careful consideration must be given to data items selected for monitoring because selection of all data items using our system can dramatically increase the requirements for computer disk space. Evaluating the criticality and sensitivity of individual data items selected can control the storage requirements for clinical trial audit trail records. Our audit trail system is capable of logging data access and data change operations to satisfy regulatory requirements. Our approach is applicable to virtually any data that can be stored in a relational database.

  15. Space tug point design study. Volume 2: Operations, performance and requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A design study to determine the configuration and characteristics of a space tug was conducted. Among the subjects analyzed in the study are: (1) flight and ground operations, (2) vehicle flight performance and performance enhancement techniques, (3) flight requirements, (4) basic design criteria, and (5) functional and procedural interface requirements between the tug and other systems.

  16. Space shuttle engineering and operations support. Avionics system engineering

    NASA Technical Reports Server (NTRS)

    Broome, P. A.; Neubaur, R. J.; Welsh, R. T.

    1976-01-01

    The shuttle avionics integration laboratory (SAIL) requirements for supporting the Spacelab/orbiter avionics verification process are defined. The principal topics are a Spacelab avionics hardware assessment, test operations center/electronic systems test laboratory (TOC/ESL) data processing requirements definition, SAIL (Building 16) payload accommodations study, and projected funding and test scheduling. Because of the complex nature of the Spacelab/orbiter computer systems, the PCM data link, and the high rate digital data system hardware/software relationships, early avionics interface verification is required. The SAIL is a prime candidate test location to accomplish this early avionics verification.

  17. Dynamics of multirate sampled data control systems. [for space shuttle boost vehicle

    NASA Technical Reports Server (NTRS)

    Naylor, J. R.; Hynes, R. J.; Molnar, D. O.

    1974-01-01

    The effect was investigated of the synthesis approach (single or multirate) on the machine requirements for a digital control system for the space shuttle boost vehicle. The study encompassed four major work areas: synthesis approach trades, machine requirements trades, design analysis requirements and multirate adaptive control techniques. The primary results are two multirate autopilot designs for the low Q and maximum Q flight conditions that exhibits equal or better performance than the analog and single rate system designs. Also, a preferred technique for analyzing and synthesizing multirate digital control systems is included.

  18. Liquid rocket booster study. Volume 2, book 6, appendix 10: Vehicle systems effects

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Three tasks were undertaken by Eagle Engineering as a part of the Liquid Rocket Booster (LRB) study. Task 1 required Eagle to supply current data relative to the Space Shuttle vehicle and systems affected by an LRB substitution. Tables listing data provided are presented. Task 2 was to evaluate and compare shuttle impacts of candidate LRB configuration in concert with overall trades of analysis activity. Three selected configurations with emphasis on flight loads, separation dynamics, and cost comparison are presented. Task 3 required the development of design guidelines and requirements to minimize impacts to the Space Shuttle system from all LRB substitution. Results are presented for progress to date.

  19. A magnetic isolation and pointing system for the astrometric telescope facility

    NASA Technical Reports Server (NTRS)

    Smith, Marcie; Hibble, William; Wolke, Patrick J.

    1993-01-01

    The astrometric telescope facility (ATF), a 20-meter telescope designed for long-term detection and observation of planetary systems outside of the solar system, is scheduled to be a major user of the Space Station's payload pointing system (PPS) capabilities. However, because the ATF has such a stringent pointing stability specification (as low as 0.01 arcsec error over the frequency range from 5 to 200 hertz) and requires +/- 180-degree roll rotation around the telescope's line of sight, the ATF's utilization of the PPS requires the addition of a mechanism or mechanisms to enhance the basic PPS capabilities. The results of a study conducted to investigate the ATF pointing performance achievable by the addition of a magnetic isolation and pointing (MIPS) system between the PPS upper gimbal and the ATF, and separately, by the addition of a passive isolation system between the Space Station and the PPS base are presented. In addition, the study produced requirements on magnetic force and gap motion as a function of the level of Space Station disturbance. These results were used to support the definition of a candidate MIPS. Pointing performance results from the study indicate that a MIPS can meet the ATF pointing requirements in the presence of a PPS base transitional acceleration of up to 0.018g, with reasonable restrictions placed on the isolation and pointing bandwidths. By contrast, the passive base isolator system must have an unrealistically low isolation bandwidth on all axes (less than 0.1 hertz) to meet ATF pointing requirements. The candidate MIPS is based on an assumed base translational disturbance of 0.01g. The system fits within the available annular region between the PPS and ATF while meeting power and weight limitations and providing the required payload roll motion. Payload data and power services are provided by noncontacting transfer devices.

  20. A preliminary 6 DOF attitude and translation control system design for Starprobe

    NASA Technical Reports Server (NTRS)

    Mak, P.; Mettler, E.; Vijayarahgavan, A.

    1981-01-01

    The extreme thermal environment near perihelion and the high-accuracy gravitational science experiments impose unique design requirements on various subsystems of Starprobe. This paper examines some of these requirements and their impact on the preliminary design of a six-degree-of-freedom attitude and translational control system. Attention is given to design considerations, the baseline attitude/translational control system, system modeling, and simulation studies.

  1. Advanced Platform Systems Technology study. Volume 2: Trade study and technology selection

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Three primary tasks were identified which include task 1-trade studies, task 2-trade study comparison and technology selection, and task 3-technology definition. Task 1 general objectives were to identify candidate technology trade areas, determine which areas have the highest potential payoff, define specific trades within the high payoff areas, and perform the trade studies. In order to satisfy these objectives, a structured, organized approach was employed. Candidate technology areas and specific trades were screened using consistent selection criteria and considering possible interrelationships. A data base comprising both manned and unmanned space platform documentation was used as a source of system and subsystem requirements. When requirements were not stated in the data base documentation, assumptions were made and recorded where necessary to characterize a particular spacecraft system. The requirements and assumptions were used together with the selection criteria to establish technology advancement goals and select trade studies. While both manned and unmanned platform data were used, the study was focused on the concept of an early manned space station.

  2. Modular transportable superconducting magnetic Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lieurance, D.; Kimball, F.; Rix, C.

    1994-12-31

    Design and cost studies were performed for the magnet components of mid-size (1-5 MWh), cold supported SMES systems using alternative configurations. The configurations studied included solenoid magnets, which required onsite assembly of the magnet system, and toroid and racetrack configurations which consisted of factory assembled modules. For each configuration, design concepts and cost information were developed for the major features of the magnet system including the conductor, electrical insulation, and structure. These studies showed that for mid-size systems, the costs of solenoid and toroid magnet configurations are comparable and that the specific configuration to be used for a given applicationmore » should be based upon customer requirements such as limiting stray fields or minimizing risks in development or construction.« less

  3. Current Concepts and Future Directions of CELSS

    NASA Technical Reports Server (NTRS)

    Macelroy, R. D.; Bredt, J.

    1985-01-01

    Bioregenerative life support systems for use in space were studied. Concepts of such systems include the use of higher plants and/or microalgae as sources of food, potable water and oxygen, and as sinks for carbon dioxide and metabolic wastes. Recycling of materials within the system will require processing of food organism and crew wastes using microbiological and/or physical chemical techniques. The dynamics of material flow within the system will require monitoring, control, stabilization and maintenance imposed by computers. Studies included higher plant and algal physiology, environmental responses, and control; flight experiments for testing responses of organisms to weightlessness and increased radiation levels; and development of ground based facilities for the study of recycling within a bioregenerative life support system.

  4. Public Service Communications Satellite User Requirements Workshop

    NASA Technical Reports Server (NTRS)

    Wolff, E. A.

    1977-01-01

    Information on user requirements for public service communications was acquired to provide the basis of a study to determine the optimum satellite system to satisfy user requirements. The concept for such a system is described: Topics discussed included requirements for data and message services, elementary and secondary education, extension and continuing education, environmental communications, library services, medical education, medical services, public broadcasting, public safety, religious applications, state and local communications, and voluntary services. Information was also obtained on procedures to follow to make the transfer to commercial services.

  5. Liquid Rocket Booster Integration Study. Volume 2: Study synopsis

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is the study summary of the five volume series.

  6. A Ground Systems Template for Remote Sensing Systems

    NASA Astrophysics Data System (ADS)

    McClanahan, Timothy P.; Trombka, Jacob I.; Floyd, Samuel R.; Truskowski, Walter; Starr, Richard D.; Clark, Pamela E.; Evans, Larry G.

    2002-10-01

    Spaceborne remote sensing using gamma and X-ray spectrometers requires particular attention to the design and development of reliable systems. These systems must ensure the scientific requirements of the mission within the challenging technical constraints of operating instrumentation in space. The Near Earth Asteroid Rendezvous (NEAR) spacecraft included X-ray and gamma-ray spectrometers (XGRS), whose mission was to map the elemental chemistry of the 433 Eros asteroid. A remote sensing system template, similar to a blackboard systems approach used in artificial intelligence, was identified in which the spacecraft, instrument, and ground system was designed and developed to monitor and adapt to evolving mission requirements in a complicated operational setting. Systems were developed for ground tracking of instrument calibration, instrument health, data quality, orbital geometry, solar flux as well as models of the asteroid's surface characteristics, requiring an intensive human effort. In the future, missions such as the Autonomous Nano-Technology Swarm (ANTS) program will have to rely heavily on automation to collectively encounter and sample asteroids in the outer asteroid belt. Using similar instrumentation, ANTS will require information similar to data collected by the NEAR X-ray/Gamma-Ray Spectrometer (XGRS) ground system for science and operations management. The NEAR XGRS systems will be studied to identify the equivalent subsystems that may be automated for ANTS. The effort will also investigate the possibility of applying blackboard style approaches to automated decision making required for ANTS.

  7. Study of the application of hydrogen fuel to long-range subsonic transport aircraft. Volume 1: Summary

    NASA Technical Reports Server (NTRS)

    Brewer, G. D.; Morris, R. E.; Lange, R. H.; Moore, J. W.

    1975-01-01

    The feasibility of using liquid hydrogen as fuel in advanced designs of long range, subsonic transport aircraft is assessed. Both passenger and cargo type aircraft are investigated. Comparisons of physical, performance, and economic parameters of the LH2 fueled designs with conventionally fueled aircraft are presented. Design studies are conducted to determine appropriate characteristics for the hydrogen related systems required on board the aircraft. These studies included consideration of material, structural, and thermodynamic requirements of the cryogenic fuel tanks and fuel systems with the structural support and thermal protection systems.

  8. Space transportation nodes assumptions and requirements: Lunar base systems study task 2.1

    NASA Technical Reports Server (NTRS)

    Kahn, Taher Ali; Simonds, Charles H.; Stump, William R.

    1988-01-01

    The Space Transportation Nodes Assumptions and Requirements task was performed as part of the Advanced Space Transportation Support Contract, a NASA Johnson Space Center (JSC) study intended to provide planning for a Lunar Base near the year 2000. The original task statement has been revised to satisfy the following queries: (1) What vehicles are to be processed at the transportation node; (2) What is the flow of activities involved in a vehicle passing through the node; and (3) What node support resources are necessary to support a lunar scenario traffic model composed of a mix of vehicles in an active flight schedule. The Lunar Base Systems Study is concentrating on the initial years of the Phase 2 Lunar Base Scenario. The study will develop the first five years of that phase in order to define the transportation and surface systems (including mass, volumes, power requirements, and designs).

  9. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 5: Design of the IPAD system. Part 2: System design. Part 3: General purpose utilities, phase 1, task 2

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.

    1973-01-01

    Viable designs are presented of various elements of the IPAD framework software, data base management system, and required new languages in relation to the capabilities of operating systems software. A thorough evaluation was made of the basic systems functions to be provide by each software element, its requirements defined in the conceptual design, the operating systems features affecting its design, and the engineering/design functions which it was intended to enhance.

  10. NASA Systems Analysis and Concepts Directorate Mission and Trade Study Analysis

    NASA Technical Reports Server (NTRS)

    Ricks, Wendell; Guynn, Mark; Hahn, Andrew; Lepsch, Roger; Mazanek, Dan; Dollyhigh, Sam

    2006-01-01

    Mission analysis, as practiced by the NASA Langley Research Center's Systems Analysis and Concepts Directorate (SACD), consists of activities used to define, assess, and evaluate a wide spectrum of aerospace systems for given requirements. The missions for these systems encompass a broad range from aviation to space exploration. The customer, who is usually another NASA organization or another government agency, often predefines the mission. Once a mission is defined, the goals and objectives that the system will need to meet are delineated and quantified. A number of alternative systems are then typically developed and assessed relative to these goals and objectives. This is done in order to determine the most favorable design approaches for further refinement. Trade studies are performed in order to understand the impact of a requirement on each system and to select among competing design options. Items varied in trade studies typically include: design variables or design constraints; technology and subsystem options; and operational approaches. The results of trade studies are often used to refine the mission and system requirements. SACD studies have been integral to the decision processes of many organizations for decades. Many recent examples of SACD mission and trade study analyses illustrate their excellence and influence. The SACD-led, Agency-wide effort to analyze a broad range of future human lunar exploration scenarios for NASA s Exploration Systems Mission Directorate (ESMD) and the Mars airplane design study in support of the Aerial Regional-scale Environment Survey of Mars (ARES) mission are two such examples. This paper describes SACD's mission and trade study analysis activities in general and presents the lunar exploration and Mars airplane studies as examples of type of work performed by the SACD.

  11. Shuttle/Agena study. Volume 2, part 3: Preliminary test plans

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Proposed testing for the Agena tug program is based upon best estimates of shuttle and Agena tug requirements and upon the Agena configuration currently envisioned to meet these requirements. The proposed tests are presented in development, qualification, system, and launch base test plans. These plans are based upon generalized requirements and assumed situations. The limitations of this study precluded all but minimal consideration of related shuttle orbiter and shuttle ground systems. The test plans include provisions for all testing from major component to systems level, identified as necessary to aid in confirmation of the modified Agena configuration for the space tug; considerations that crew safety requirements and new environmental conditions from shuttle interface effects do impose some new Agena testing requirements; considerations that many existing Agena flight-qualified components will be utilized and qualification testing will be minimal; testing not only for the Agena tug but also for new or modified items of handling or servicing equipment for supporting the Agena factory-to-launch sequence; and the assembly of required testing into a sequence-ordered series of events.

  12. Shuttle cryogenic supply system. Optimization study. Volume 5 B-1: Programmers manual for math models

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A computer program for rapid parametric evaluation of various types of cryogenics spacecraft systems is presented. The mathematical techniques of the program provide the capability for in-depth analysis combined with rapid problem solution for the production of a large quantity of soundly based trade-study data. The program requires a large data bank capable of providing characteristics performance data for a wide variety of component assemblies used in cryogenic systems. The program data requirements are divided into: (1) the semipermanent data tables and source data for performance characteristics and (2) the variable input data which contains input parameters which may be perturbated for parametric system studies.

  13. Structural design considerations for the beam transmission optical system

    NASA Technical Reports Server (NTRS)

    Macneal, Paul D.; Lou, Michael C.

    1993-01-01

    The paper describes the JPL study leading to a baseline design of the Beam Transmission Optical System (BTOS), designed for the delivery of laser energy from earth to space targets. The study identified the driving environmental and functional requirements; developed a conceptual design of the BTOS telescope; and performed static, thermal distortion, and model analyses to verify that these requirements are met. The study also identified major areas of concern which should be investigated further.

  14. Validation of a SysML based design for wireless sensor networks

    NASA Astrophysics Data System (ADS)

    Berrachedi, Amel; Rahim, Messaoud; Ioualalen, Malika; Hammad, Ahmed

    2017-07-01

    When developing complex systems, the requirement for the verification of the systems' design is one of the main challenges. Wireless Sensor Networks (WSNs) are examples of such systems. We address the problem of how WSNs must be designed to fulfil the system requirements. Using the SysML Language, we propose a Model Based System Engineering (MBSE) specification and verification methodology for designing WSNs. This methodology uses SysML to describe the WSNs requirements, structure and behaviour. Then, it translates the SysML elements to an analytic model, specifically, to a Deterministic Stochastic Petri Net. The proposed approach allows to design WSNs and study their behaviors and their energy performances.

  15. Nuclear electric propulsion operational reliability and crew safety study: NEP systems/modeling report

    NASA Technical Reports Server (NTRS)

    Karns, James

    1993-01-01

    The objective of this study was to establish the initial quantitative reliability bounds for nuclear electric propulsion systems in a manned Mars mission required to ensure crew safety and mission success. Finding the reliability bounds involves balancing top-down (mission driven) requirements and bottom-up (technology driven) capabilities. In seeking this balance we hope to accomplish the following: (1) provide design insights into the achievability of the baseline design in terms of reliability requirements, given the existing technology base; (2) suggest alternative design approaches which might enhance reliability and crew safety; and (3) indicate what technology areas require significant research and development to achieve the reliability objectives.

  16. Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

  17. Parental perceptions of the learner driver log book system in two Australian states.

    PubMed

    Bates, Lyndel; Watson, Barry; King, Mark Johann

    2014-01-01

    Though many jurisdictions internationally now require learner drivers to complete a specified number of hours of supervised driving practice before being able to drive unaccompanied, very few require learner drivers to complete a log book to record this practice and then present it to the licensing authority. Learner drivers in most Australian jurisdictions must complete a log book that records their practice, thereby confirming to the licensing authority that they have met the mandated hours of practice requirement. These log books facilitate the management and enforcement of minimum supervised hours of driving requirements. Parents of learner drivers in 2 Australian states, Queensland and New South Wales, completed an online survey assessing a range of factors, including their perceptions of the accuracy of their child's learner log book and the effectiveness of the log book system. The study indicates that the large majority of parents believe that their child's learner log book is accurate. However, they generally report that the log book system is only moderately effective as a system to measure the number of hours of supervised practice a learner driver has completed. The results of this study suggest the presence of a paradox, with many parents possibly believing that others are not as diligent in the use of log books as they are or that the system is too open to misuse. Given that many parents report that their child's log book is accurate, this study has important implications for the development and ongoing monitoring of hours of practice requirements in graduated driver licensing systems.

  18. Image data processing system requirements study. Volume 1: Analysis. [for Earth Resources Survey Program

    NASA Technical Reports Server (NTRS)

    Honikman, T.; Mcmahon, E.; Miller, E.; Pietrzak, L.; Yorsz, W.

    1973-01-01

    Digital image processing, image recorders, high-density digital data recorders, and data system element processing for use in an Earth Resources Survey image data processing system are studied. Loading to various ERS systems is also estimated by simulation.

  19. Preliminary Thermal Design of Cryogenic Radiation Shielding

    NASA Technical Reports Server (NTRS)

    Li, Xiaoyi; Mustafi, Shuvo; Boutte, Alvin

    2015-01-01

    Cryogenic Hydrogen Radiation Shielding (CHRS) is the most mass efficient material radiation shielding strategy for human spaceflight beyond low Earth orbit (LEO). Future human space flight, mission beyond LEO could exceed one year in duration. Previous radiation studies showed that in order to protect the astronauts from space radiation with an annual allowable radiation dose less than 500 mSv, 140 kgm2 of polyethylene is necessary. For a typical crew module that is 4 meter in diameter and 8 meter in length. The mass of polyethylene radiation shielding required would be more than 17,500 kg. The same radiation study found that the required hydrogen shielding for the same allowable radiation dose is 40 kgm2, and the mass of hydrogen required would be 5, 000 kg. Cryogenic hydrogen has higher densities and can be stored in relatively small containment vessels. However, the CHRS system needs a sophisticated thermal system which prevents the cryogenic hydrogen from evaporating during the mission. This study designed a cryogenic thermal system that protects the CHRS from hydrogen evaporation for one to up to three year mission. The design also includes a ground based cooling system that can subcool and freeze liquid hydrogen. The final results show that the CHRS with its required thermal protection system is nearly half of the mass of polyethylene radiation shielding.

  20. A SEASAT-A synthetic aperture imaging radar system

    NASA Technical Reports Server (NTRS)

    Jordan, R. L.; Rodgers, D. H.

    1975-01-01

    The SEASAT, a synthetic aperture imaging radar system is the first radar system of its kind designed for the study of ocean wave patterns from orbit. The basic requirement of this system is to generate continuous radar imagery with a 100 km swath with 25m resolution from an orbital altitude of 800 km. These requirements impose unique system design problems. The end to end data system described including interactions of the spacecraft, antenna, sensor, telemetry link, and data processor. The synthetic aperture radar system generates a large quantity of data requiring the use of an analog link with stable local oscillator encoding. The problems associated in telemetering the radar information with sufficient fidelity to synthesize an image on the ground is described as well as the selected solutions to the problems.

  1. The conception, birth, and growth of a missile umbilical system

    NASA Technical Reports Server (NTRS)

    Nordman, G. W.

    1977-01-01

    The design development was traced for the sprint 2 and improved sprint 2 missile system (ISMS) umbilical system. The unique system requirements, umbilical designs considered to meet the requirements, and the problems encountered and solutions derived during the design, and development testing of the selected systems are described. The sprint 2 development effort consisted of design, analysis, and testing activities. The ISMS effort involved the performance of an extensive trade study to determine the optimum design to meet the ISMS conditions.

  2. A study of Schwarz converters for nuclear powered spacecraft

    NASA Technical Reports Server (NTRS)

    Stuart, Thomas A.; Schwarze, Gene E.

    1987-01-01

    High power space systems which use low dc voltage, high current sources such as thermoelectric generators, will most likely require high voltage conversion for transmission purposes. This study considers the use of the Schwarz resonant converter for use as the basic building block to accomplish this low-to-high voltage conversion for either a dc or an ac spacecraft bus. The Schwarz converter has the important assets of both inherent fault tolerance and resonant operation; parallel operation in modular form is possible. A regulated dc spacecraft bus requires only a single stage converter while a constant frequency ac bus requires a cascaded Schwarz converter configuration. If the power system requires constant output power from the dc generator, then a second converter is required to route unneeded power to a ballast load.

  3. Advanced extravehicular activity systems requirements definition study. Phase 2: Extravehicular activity at a lunar base

    NASA Technical Reports Server (NTRS)

    Neal, Valerie; Shields, Nicholas, Jr.; Carr, Gerald P.; Pogue, William; Schmitt, Harrison H.; Schulze, Arthur E.

    1988-01-01

    The focus is on Extravehicular Activity (EVA) systems requirements definition for an advanced space mission: remote-from-main base EVA on the Moon. The lunar environment, biomedical considerations, appropriate hardware design criteria, hardware and interface requirements, and key technical issues for advanced lunar EVA were examined. Six remote EVA scenarios (three nominal operations and three contingency situations) were developed in considerable detail.

  4. Aerodynamics as a subway design parameter

    NASA Technical Reports Server (NTRS)

    Kurtz, D. W.

    1976-01-01

    A parametric sensitivity study has been performed on the system operational energy requirement in order to guide subway design strategy. Aerodynamics can play a dominant or trivial role, depending upon the system characteristics. Optimization of the aerodynamic parameters may not minimize the total operational energy. Isolation of the station box from the tunnel and reduction of the inertial power requirements pay the largest dividends in terms of the operational energy requirement.

  5. Operational fitness of box truss antennas in response to dynamic slewing

    NASA Technical Reports Server (NTRS)

    Bachtell, E. E.; Bettadapur, S. S.; Schartel, W. A.; Karanian, L. A.

    1985-01-01

    A parametric study was performed to define slewing capability of large satellites along with associated system changes or subsystem weight and complexity impacts. The satellite configuration and structural arrangement from the Earth Observation Spacecraft (EOS) study was used as the baseline spacecraft. Varying slew rates, settling times, damping, maneuver frequencies, and attitude hold times provided the data required to establish applicability to a wide range of potential missions. The key elements of the study are: (1) determine the dynamic transient response of the antenna system; (2) calculate the system errors produced by the dynamic response; (3) determine if the antenna has exceeded operational requirements at completion of the slew, and if so; (4) determine when the antenna has settled to the operational requirements. The slew event is not considered complete until the antenna is within operational limits.

  6. Proximity operations concept design study, task 6

    NASA Technical Reports Server (NTRS)

    Williams, A. N.

    1990-01-01

    The feasibility of using optical technology to perform the mission of the proximity operations communications subsystem on Space Station Freedom was determined. Proximity operations mission requirements are determined and the relationship to the overall operational environment of the space station is defined. From this information, the design requirements of the communication subsystem are derived. Based on these requirements, a preliminary design is developed and the feasibility of implementation determined. To support the Orbital Maneuvering Vehicle and National Space Transportation System, the optical system development is straightforward. The requirements on extra-vehicular activity are such as to allow large fields of uncertainty, thus exacerbating the acquisition problem; however, an approach is given that could mitigate this problem. In general, it is found that such a system could indeed perform the proximity operations mission requirement, with some development required to support extra-vehicular activity.

  7. Requirements Flowdown for Prognostics and Health Management

    NASA Technical Reports Server (NTRS)

    Goebel, Kai; Saxena, Abhinav; Roychoudhury, Indranil; Celaya, Jose R.; Saha, Bhaskar; Saha, Sankalita

    2012-01-01

    Prognostics and Health Management (PHM) principles have considerable promise to change the game of lifecycle cost of engineering systems at high safety levels by providing a reliable estimate of future system states. This estimate is a key for planning and decision making in an operational setting. While technology solutions have made considerable advances, the tie-in into the systems engineering process is lagging behind, which delays fielding of PHM-enabled systems. The derivation of specifications from high level requirements for algorithm performance to ensure quality predictions is not well developed. From an engineering perspective some key parameters driving the requirements for prognostics performance include: (1) maximum allowable Probability of Failure (PoF) of the prognostic system to bound the risk of losing an asset, (2) tolerable limits on proactive maintenance to minimize missed opportunity of asset usage, (3) lead time to specify the amount of advanced warning needed for actionable decisions, and (4) required confidence to specify when prognosis is sufficiently good to be used. This paper takes a systems engineering view towards the requirements specification process and presents a method for the flowdown process. A case study based on an electric Unmanned Aerial Vehicle (e-UAV) scenario demonstrates how top level requirements for performance, cost, and safety flow down to the health management level and specify quantitative requirements for prognostic algorithm performance.

  8. Integrated source and channel encoded digital communication system design study

    NASA Technical Reports Server (NTRS)

    Huth, G. K.; Udalov, S.

    1974-01-01

    This study investigated the configuration and integration of a wideband communication system with a Ku-band rendezvous radar system. The goal of the study was to provide as much commonality between the two systems as possible. The antenna design was described with the only change being the requirement for dual polarization (linear for the radar system and circular for the communication system).

  9. Identifying and Validating Requirements of a Mobile-Based Self-Management System for People Living with HIV.

    PubMed

    Mehraeen, Esmaeil; Safdari, Reza; Seyedalinaghi, Seyed Ahmad; Mohammadzadeh, Niloofar; Arji, Goli

    2018-01-01

    Due to the widespread use of mobile technology and the low cost of this technology, implementing a mobile-based self-management system can lead to adherence to the medication regimens and promotion of the health of people living with HIV (PLWH). We aimed to identify requirements of a mobile-based self-management system, and validate them from the perspective of infectious diseases specialists. This is a mixed-methods study that carried out in two main phases. In the first phase, we identified requirements of a mobile-based self-management system for PLWH. In the second phase, identified requirements were validated using a researcher made questionnaire. The statistical population was infectious diseases specialists affiliated to Tehran University of Medical Sciences. The collected data were analyzed using SPSS statistical software (version 19), and descriptive statistics. By full-text review of selected studies, we determined requirements of a mobile-based self-management system in four categories: demographic, clinical, strategically and technical capabilities. According to the findings, 6 data elements for demographic category, 11 data elements for clinical category, 10 items for self-management strategies, and 11 features for technical capabilities were selected. Using the identified preferences, it is possible to design and implement a mobile-based self-management system for HIV-positive people. Developing a mobile-based self-management system is expected to progress the skills of self-management PLWH, improve of medication regimen adherence, and facilitate communication with healthcare providers.

  10. Information transfer satellite concept study. Volume 4: computer manual

    NASA Technical Reports Server (NTRS)

    Bergin, P.; Kincade, C.; Kurpiewski, D.; Leinhaupel, F.; Millican, F.; Onstad, R.

    1971-01-01

    The Satellite Telecommunications Analysis and Modeling Program (STAMP) provides the user with a flexible and comprehensive tool for the analysis of ITS system requirements. While obtaining minimum cost design points, the program enables the user to perform studies over a wide range of user requirements and parametric demands. The program utilizes a total system approach wherein the ground uplink and downlink, the spacecraft, and the launch vehicle are simultaneously synthesized. A steepest descent algorithm is employed to determine the minimum total system cost design subject to the fixed user requirements and imposed constraints. In the process of converging to the solution, the pertinent subsystem tradeoffs are resolved. This report documents STAMP through a technical analysis and a description of the principal techniques employed in the program.

  11. Advanced flight deck/crew station simulator functional requirements

    NASA Technical Reports Server (NTRS)

    Wall, R. L.; Tate, J. L.; Moss, M. J.

    1980-01-01

    This report documents a study of flight deck/crew system research facility requirements for investigating issues involved with developing systems, and procedures for interfacing transport aircraft with air traffic control systems planned for 1985 to 2000. Crew system needs of NASA, the U.S. Air Force, and industry were investigated and reported. A matrix of these is included, as are recommended functional requirements and design criteria for simulation facilities in which to conduct this research. Methods of exploiting the commonality and similarity in facilities are identified, and plans for exploiting this in order to reduce implementation costs and allow efficient transfer of experiments from one facility to another are presented.

  12. Heat engine development for solar thermal power systems

    NASA Astrophysics Data System (ADS)

    Pham, H. Q.; Jaffe, L. D.

    The parabolic dish solar collector systems for converting sunlight to electrical power through a heat engine will, require a small heat engine of high performance long lifetime to be competitive with conventional power systems. The most promising engine candidates are Stirling, high temperature Brayton, and combined cycle. Engines available in the current market today do not meet these requirements. The development of Stirling and high temperature Brayton for automotive applications was studied which utilizes much of the technology developed in this automotive program for solar power engines. The technical status of the engine candidates is reviewed and the components that may additional development to meet solar thermal system requirements are identified.

  13. Digital control of highly augmented combat rotorcraft

    NASA Technical Reports Server (NTRS)

    Tischler, Mark B.

    1987-01-01

    Proposed concepts for the next generation of combat helicopters are to be embodied in a complex, highly maneuverable, multiroled vehicle with avionics systems. Single pilot and nap-of-the-Earth operations require handling qualities which minimize the involvement of the pilot in basic stabilization tasks. To meet these requirements will demand a full authority, high-gain, multimode, multiply-redundant, digital flight-control system. The gap between these requirements and current low-authority, low-bandwidth operational rotorcraft flight-control technology is considerable. This research aims at smoothing the transition between current technology and advanced concept requirements. The state of the art of high-bandwidth digital flight-control systems are reviewed; areas of specific concern for flight-control systems of modern combat are exposed; and the important concepts are illustrated in design and analysis of high-gain, digital systems with a detailed case study involving a current rotorcraft system. Approximate and exact methods are explained and illustrated for treating the important concerns which are unique to digital systems.

  14. A study of the portability of an Ada system in the software engineering laboratory (SEL)

    NASA Technical Reports Server (NTRS)

    Jun, Linda O.; Valett, Susan Ray

    1990-01-01

    A particular porting effort is discussed, and various statistics on analyzing the portability of Ada and the total staff months (overall and by phase) required to accomplish the rehost, are given. This effort is compared to past experiments on the rehosting of FORTRAN systems. The discussion includes an analysis of the types of errors encountered during the rehosting, the changes required to rehost the system, experiences with the Alsys IBM Ada compiler, the impediments encountered, and the lessons learned during this study.

  15. A survey of candidate missions to explore Saturn's rings

    NASA Technical Reports Server (NTRS)

    Wells, W. C.; Price, M. J.

    1972-01-01

    The ring system around Saturn is discussed. Exploration of the rings is required for an understanding of their origin and the hazard they represent to spacecraft near Saturn. In addition the rings may provide useful clues to the origin of the solar system. This study examines the problem of ring system exploration and recommends a sequence of missions which will collect the data required.

  16. Comparative Anatomy of Maintenance Tasks (CAMT): A Feasibility Study

    DTIC Science & Technology

    1992-03-01

    systems. Methods for task primitive definition were developed, then taken into the field for testing . Task primitives were defined to cover three remove...engine maintenance) and to test whether task primitives developed for one weapon system could have applicability to other weapon systems (Phase 2...requirements, levying MPT constraints and predicting MPT requirements are only ritualistic exercises until the operational test and evaluation of a

  17. Study of data collection platform concepts: Data collection system user requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The overall purpose of the survey was to provide real world data on user requirements. The intent was to assess data collection system user requirements by questioning actual potential users rather than speculating on requirements. The end results of the survey are baseline requirements models for both a data collection platform and a data collection system. These models were derived from the survey results. The real value of these models lies in the fact that they are based on actual user requirements as delineated in the survey questionnaires. Some users desire data collection platforms of small size and light weight. These sizes and weights are beyond the present state of the art. Also, the survey provided a wealth of information on the nature and constituency of the data collection user community as well as information on user applications for data collection systems. Finally, the data sheds light on the generalized platform concept. That is, the diversity of user requirements shown in the data indicates the difficulty that can be anticipated in attempting to implement such a concept.

  18. Definition of mission requirements for the follow-on EUMETSAT polar system

    NASA Astrophysics Data System (ADS)

    Phillips, P. L.; Schlüssel, P.; Accadia, C. J.; Munro, R.; Wilson, J. J. W.; Perez-Albinana, A.; Banfi, S.

    2007-10-01

    EUMETSAT has initiated preparatory activities for the definition of the follow-on EUMETSAT Polar System (post- EPS) needed for the timeframe 2020 onwards as a replacement for the current EUMETSAT Polar System. Based on the first outputs of the EUMETSAT post-EPS user consultation process initiated in 2005, mission requirements for potential post-EPS missions have been drafted. Expertise from a variety of communities was drawn upon in order to ascertain user needs expressed in terms of geophysical variables, for operational meteorology, climate monitoring, atmospheric chemistry, oceanography, and hydrology. Current trends in the evolution of these applications were considered in order to derive the necessary satellite products that will be required in the post-EPS era. The increasing complexity of models with regard to parameterisation and data assimilation, along with the trend towards coupled atmosphere, ocean and land models, generates new requirements, particularly in the domains of clouds and precipitation, trace gases and ocean/land surface products. Following the requirements definition, concept studies at instrument and system levels will shortly commence with the support of the European Space Agency (ESA), together with industry and representatives of the user and science communities. Such studies, planned for completion by end of 2008, aim at defining and trading off possible mission and system concepts and will establish preliminary functional requirements for full or partial implementation of post-EPS mission requirements. Cost drivers and needs for critical research and development will also be identified. The generation of both the user and mission requirements have been supported substantially by the post-EPS Mission Experts Team and the Application Expert Groups. Their support is gratefully acknowledged.

  19. Ancillary study management systems: a review of needs

    PubMed Central

    2013-01-01

    Background The valuable clinical data, specimens, and assay results collected during a primary clinical trial or observational study can enable researchers to answer additional, pressing questions with relatively small investments in new measurements. However, management of such follow-on, “ancillary” studies is complex. It requires coordinating across institutions, sites, repositories, and approval boards, as well as distributing, integrating, and analyzing diverse data types. General-purpose software systems that simplify the management of ancillary studies have not yet been explored in the research literature. Methods We have identified requirements for ancillary study management primarily as part of our ongoing work with a number of large research consortia. These organizations include the Center for HIV/AIDS Vaccine Immunology (CHAVI), the Immune Tolerance Network (ITN), the HIV Vaccine Trials Network (HVTN), the U.S. Military HIV Research Program (MHRP), and the Network for Pancreatic Organ Donors with Diabetes (nPOD). We also consulted with researchers at a range of other disease research organizations regarding their workflows and data management strategies. Lastly, to enhance breadth, we reviewed process documents for ancillary study management from other organizations. Results By exploring characteristics of ancillary studies, we identify differentiating requirements and scenarios for ancillary study management systems (ASMSs). Distinguishing characteristics of ancillary studies may include the collection of additional measurements (particularly new analyses of existing specimens); the initiation of studies by investigators unaffiliated with the original study; cross-protocol data pooling and analysis; pre-existing participant consent; and pre-existing data context and provenance. For an ASMS to address these characteristics, it would need to address both operational requirements (e.g., allocating existing specimens) and data management requirements (e.g., securely distributing and integrating primary and ancillary data). Conclusions The scenarios and requirements we describe can help guide the development of systems that make conducting ancillary studies easier, less expensive, and less error-prone. Given the relatively consistent characteristics and challenges of ancillary study management, general-purpose ASMSs are likely to be useful to a wide range of organizations. Using the requirements identified in this paper, we are currently developing an open-source, general-purpose ASMS based on LabKey Server (http://www.labkey.org) in collaboration with CHAVI, the ITN and nPOD. PMID:23294514

  20. Carolina Offshore Wind Integration Case Study: Phases I and II Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fallon, Christopher; Piper, Orvane; Hazelip, William

    2015-04-30

    Duke Energy performed a phase 1 study to assess the impact of offshore wind development in the waters off the coasts of North Carolina and South Carolina. The study analyzed the impacts to the Duke Energy Carolinas electric power system of multiple wind deployment scenarios. Focusing on an integrated utility system in the Carolinas provided a unique opportunity to assess the impacts of offshore wind development in a region that has received less attention regarding renewables than others in the US. North Carolina is the only state in the Southeastern United States that currently has a renewable portfolio standard (RPS)more » which requires that 12.5% of the state’s total energy requirements be met with renewable resources by 2021. 12.5% of the state’s total energy requirements in 2021 equates to approximately 17,000 GWH of energy needed from renewable resources. Wind resources represent one of the ways to potentially meet this requirement. The study builds upon and augments ongoing work, including a study by UNC to identify potential wind development sites and the analysis of impacts to the regional transmission system performed by the NCTPC, an Order 890 planning entity of which DEC is a member. Furthermore, because the region does not have an independent system operator (ISO) or regional transmission organization (RTO), the study will provide additional information unique to non-RTO/ISO systems. The Phase 2 study builds on the results of Phase 1 and investigates the dynamic stability of the electrical network in Task 4, the operating characteristics of the wind turbines as they impact operating reserve requirements of the DEC utility in Task 5, and the production cost of integrating the offshore wind resources into the DEC generation fleet making comparisons to future planned operation without the addition of the wind resources in Task 6.« less

  1. Recommended Skill Requirements of Recent Management Information Systems Graduates for Employment: A Modified Delphi Study

    ERIC Educational Resources Information Center

    Strnad, Michael A., Sr.

    2013-01-01

    The purpose of this Modified Delphi study was to achieve a consensus and forecast a prediction from expert IT hiring managers on what skills are required of MIS graduates for employment. In doing so, guidance could be provided to academic leaders who design curricula for MIS students on the required skills for employment. This study was conducted…

  2. LDR cryogenics

    NASA Technical Reports Server (NTRS)

    Nast, T.

    1988-01-01

    A brief summary from the 1985 Large Deployable Reflector (LDR) Asilomar 2 workshop of the requirements for LDR cryogenic cooling is presented. The heat rates are simply the sum of the individual heat rates from the instruments. Consideration of duty cycle will have a dramatic effect on cooling requirements. There are many possible combinations of cooling techniques for each of the three temperatures zones. It is clear that much further system study is needed to determine what type of cooling system is required (He-2, hybrid or mechanical) and what size and power is required. As the instruments, along with their duty cycles and heat rates, become better defined it will be possible to better determine the optimum cooling systems.

  3. Development of a web-based and mobile app to support physical activity in individuals with rheumatoid arthritis: results from the second step of a co-design process.

    PubMed

    Revenäs, Åsa; Opava, Christina H; Martin, Cathrin; Demmelmaier, Ingrid; Keller, Christina; Åsenlöf, Pernilla

    2015-02-09

    Long-term adherence to physical activity recommendations remains challenging for most individuals with rheumatoid arthritis (RA) despite evidence for its health benefits. The aim of this study was to provide basic data on system requirement specifications for a Web-based and mobile app to self-manage physical activity. More specifically, we explored the target user group, features of the future app, and correlations between the system requirements and the established behavior change techniques (BCTs). We used a participatory action research design. Qualitative data were collected using multiple methods in four workshops. Participants were 5 individuals with RA, a clinical physiotherapist, an officer from the Swedish Rheumatism Association, a Web designer, and 2 physiotherapy researchers. A taxonomy was used to determine the degree of correlation between the system requirements and established BCTs. Participants agreed that the future Web-based and mobile app should be based on two major components important for maintaining physical activity: (1) a calendar feature for goal setting, planning, and recording of physical activity performance and progress, and (2) a small community feature for positive feedback and support from peers. All system requirements correlated with established BCTs, which were coded as 24 different BCTs. To our knowledge, this study is the first to involve individuals with RA as co-designers, in collaboration with clinicians, researchers, and Web designers, to produce basic data to generate system requirement specifications for an eHealth service. The system requirements correlated to the BCTs, making specifications of content and future evaluation of effectiveness possible.

  4. Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 7: System/subsystems requirements databook

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1981-01-01

    This volume summarizes the basic requirements used as a guide to systems analysis, and is a basis for the selection of candidate Satellite Power Systems (SPS) point designs. Initially, these collected data reflected the level of definition resulting from the evaluation of a broad spectrum of SPS concepts. As the various concepts matured, these requirements were updated to reflect the requirements identified for the projected satellite system/subsystem point designs. Included is an updated version of earlier Rockwell concepts using klystrons as the specific microwave power amplification approach, as well as a more in-depth definition, analysis and preliminary point design on two concepts based on the use of advanced solid state technology to accomplish the task of high power amplification of the 2.45 GHz transmitted power beam to the Earth receiver. Finally, a preliminary definition of a concept using magnetrons as the microwave power amplifiers is presented.

  5. Network operating system focus technology

    NASA Technical Reports Server (NTRS)

    1985-01-01

    An activity structured to provide specific design requirements and specifications for the Space Station Data Management System (DMS) Network Operating System (NOS) is outlined. Examples are given of the types of supporting studies and implementation tasks presently underway to realize a DMS test bed capability to develop hands-on understanding of NOS requirements as driven by actual subsystem test beds participating in the overall Johnson Space Center test bed program. Classical operating system elements and principal NOS functions are listed.

  6. SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 2. Appendix A: Design study for a SLEEC actuation system

    NASA Technical Reports Server (NTRS)

    Thompson, D. S.

    1986-01-01

    The results are presented of a design feasibility study of a self-contained (powered) actuation system for a Shingle Lap Extendible Exit Cone (SLEEC) for Transportation System (STS). The evolution of the SLEEC actuation system design is reviewed, the final design concept is summarized, and the results of the detailed study of the final concept of the actuation system are treated. A conservative design using proven mechanical components was established as a major program priority. The final mechanical design has a very low development risk since the components, which consist of ballscrews, gearing, flexible shaft drives, and aircraft cables, have extensive aerospace applications and a history of proven reliability. The mathematical model studies have shown that little or no power is required to deploy the SLEEC actuation system because acceleration forces and internal pressure from the rocket plume provide the required energies. A speed control brake is incorporated in the design in order to control the rate of deployment.

  7. Initial solubility & density evaluation of Non-Aqueous system of amino acid salts for CO2 capture: potassium prolinate blended with ethanol and ethylene glycol

    NASA Astrophysics Data System (ADS)

    Murshid, Ghulam; Garg, Sahil

    2018-05-01

    Amine scrubbing is the state of the art technology for CO2 capture, and solvent selection can significantly reduce the capital and energy cost of the process. Higher energy requirement for aqueous amine based CO2 removal process is still a most important downside preventive its industrial deployment. Therefore, in this study, novel non-aqueous based amino acid salt system consisting of potassium prolinate, ethanol and ethylene glycol has been studied. This work presents initial CO2 solubility study and important physical properties i.e. density of the studied solvent system. Previous work showed that non-aqueous system of potassium prolinate and ethanol has good absorption rates and requires lower energy for solvent regeneration. However, during regeneration, solvent loss issues were found due to lower boiling point of the ethanol. Therefore, ethylene glycol was added into current studied system for enhancing the overall boiling point of the system. The good initial CO2 solubility and low density of studied solvent system offers several advantages as compared to conventional amine solutions.

  8. AFC-Enabled Vertical Tail System Integration Study

    NASA Technical Reports Server (NTRS)

    Mooney, Helen P.; Brandt, John B.; Lacy, Douglas S.; Whalen, Edward A.

    2014-01-01

    This document serves as the final report for the SMAAART AFC-Enabled Vertical Tail System Integration Study. Included are the ground rule assumptions which have gone into the study, layouts of the baseline and AFC-enabled configurations, critical sizing information, system requirements and architectures, and assumed system properties that result in an NPV assessment of the two candidate AFC technologies.

  9. System and Propagation Availability Analysis for NASA's Advanced Air Transportation Technologies

    NASA Technical Reports Server (NTRS)

    Ugweje, Okechukwu C.

    2000-01-01

    This report summarizes the research on the System and Propagation Availability Analysis for NASA's project on Advanced Air Transportation Technologies (AATT). The objectives of the project were to determine the communication systems requirements and architecture, and to investigate the effect of propagation on the transmission of space information. In this report, results from the first year investigation are presented and limitations are highlighted. To study the propagation links, an understanding of the total system architecture is necessary since the links form the major component of the overall architecture. This study was conducted by way of analysis, modeling and simulation on the system communication links. The overall goals was to develop an understanding of the space communication requirements relevant to the AATT project, and then analyze the links taking into consideration system availability under adverse atmospheric weather conditions. This project began with a preliminary study of the end-to-end system architecture by modeling a representative communication system in MATLAB SIMULINK. Based on the defining concepts, the possibility of computer modeling was determined. The investigations continue with the parametric studies of the communication system architecture. These studies were also carried out with SIMULINK modeling and simulation. After a series of modifications, two end-to-end communication links were identified as the most probable models for the communication architecture. Link budget calculations were then performed in MATHCAD and MATLAB for the identified communication scenarios. A remarkable outcome of this project is the development of a graphic user interface (GUI) program for the computation of the link budget parameters in real time. Using this program, one can interactively compute the link budget requirements after supplying a few necessary parameters. It provides a framework for the eventual automation of several computations required in many experimental NASA missions. For the first year of this project, most of the stated objectives were accomplished. We were able to identify probable communication systems architectures, model and analyze several communication links, perform numerous simulation on different system models, and then develop a program for the link budget analysis. However, most of the work is still unfinished. The effect of propagation on the transmission of information in the identified communication channels has not been performed. Propagation effects cannot be studied until the system under consideration is identified and characterized. To study the propagation links, an understanding of the total communications architecture is necessary. It is important to mention that the original project was intended for two years and the results presented here are only for the first year of research. It is prudent therefore that these efforts be continued in order to obtain a complete picture of the system and propagation availability requirements.

  10. Liquid rocket booster integration study. Volume 3: Study products. Part 2: Sections 8-19

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is part two of the study products section of the five volume series.

  11. Liquid rocket booster integration study. Volume 3, part 1: Study products

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The impacts of introducing liquid rocket booster engines (LRB) into the Space Transportation System (STS)/Kennedy Space Center (KSC) launch environment are identified and evaluated. Proposed ground systems configurations are presented along with a launch site requirements summary. Prelaunch processing scenarios are described and the required facility modifications and new facility requirements are analyzed. Flight vehicle design recommendations to enhance launch processing are discussed. Processing approaches to integrate LRB with existing STS launch operations are evaluated. The key features and significance of launch site transition to a new STS configuration in parallel with ongoing launch activities are enumerated. This volume is part one of the study products section of the five volume series.

  12. Optimization of the microcable and detector parameters towards low noise in the STS readout system

    NASA Astrophysics Data System (ADS)

    Kasinski, Krzysztof; Kleczek, Rafal; Schmidt, Christian J.

    2015-09-01

    Successful operation of the Silicon Tracking System requires charge measurement of each hit with equivalent noise charge lower than 1000 e- rms. Detector channels will not be identical, they will be constructed accordingly to the estimated occupancy, therefore for the readout electronics, detector system will exhibit various parameters. This paper presents the simulation-based study on the required microcable (trace width, dielectric material), detector (aluminum strip resistance) and external passives' (decoupling capacitors) parameters in the Silicon Tracking System. Studies will be performed using a front-end electronics (charge sensitive amplifier with shaper) designed for the power budget of 10 mA/channel.

  13. Energy harvesting concepts for small electric unmanned systems

    NASA Astrophysics Data System (ADS)

    Qidwai, Muhammad A.; Thomas, James P.; Kellogg, James C.; Baucom, Jared N.

    2004-07-01

    In this study, we identify and survey energy harvesting technologies for small electrically powered unmanned systems designed for long-term (>1 day) time-on-station missions. An environmental energy harvesting scheme will provide long-term, energy additions to the on-board energy source. We have identified four technologies that cover a broad array of available energy sources: solar, kinetic (wind) flow, autophagous structure-power (both combustible and metal air-battery systems) and electromagnetic (EM) energy scavenging. We present existing conceptual designs, critical system components, performance, constraints and state-of-readiness for each technology. We have concluded that the solar and autophagous technologies are relatively matured for small-scale applications and are capable of moderate power output levels (>1 W). We have identified key components and possible multifunctionalities in each technology. The kinetic flow and EM energy scavenging technologies will require more in-depth study before they can be considered for implementation. We have also realized that all of the harvesting systems require design and integration of various electrical, mechanical and chemical components, which will require modeling and optimization using hybrid mechatronics-circuit simulation tools. This study provides a starting point for detailed investigation into the proposed technologies for unmanned system applications under current development.

  14. Grid Integration Studies: Advancing Clean Energy Planning and Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katz, Jessica; Chernyakhovskiy, Ilya

    2016-07-01

    Integrating significant variable renewable energy (VRE) into the grid requires an evolution in power system planning and operation. To plan for this evolution, power system stakeholders can undertake grid integration studies. This Greening the Grid document reviews grid integration studies, common elements, questions, and guidance for system planners.

  15. Concept of a Cloud Service for Data Preparation and Computational Control on Custom HPC Systems in Application to Molecular Dynamics

    NASA Astrophysics Data System (ADS)

    Puzyrkov, Dmitry; Polyakov, Sergey; Podryga, Viktoriia; Markizov, Sergey

    2018-02-01

    At the present stage of computer technology development it is possible to study the properties and processes in complex systems at molecular and even atomic levels, for example, by means of molecular dynamics methods. The most interesting are problems related with the study of complex processes under real physical conditions. Solving such problems requires the use of high performance computing systems of various types, for example, GRID systems and HPC clusters. Considering the time consuming computational tasks, the need arises of software for automatic and unified monitoring of such computations. A complex computational task can be performed over different HPC systems. It requires output data synchronization between the storage chosen by a scientist and the HPC system used for computations. The design of the computational domain is also quite a problem. It requires complex software tools and algorithms for proper atomistic data generation on HPC systems. The paper describes the prototype of a cloud service, intended for design of atomistic systems of large volume for further detailed molecular dynamic calculations and computational management for this calculations, and presents the part of its concept aimed at initial data generation on the HPC systems.

  16. Requirements for a Global Greenhouse Gas Information System

    NASA Astrophysics Data System (ADS)

    Duren, R.; Boland, S.; Lempert, R.; Miller, C.

    2008-12-01

    A global greenhouse gas information system will prove a critical component of any successful effort to mitigate climate change which relies on limiting the atmospheric concentration of greenhouse gases. The system will provide the situational awareness necessary to actively reduce emissions, influence land use change, and sequester carbon. The information from such a system will be subject to intense scrutiny. Therefore, an effective system must openly and transparently produce data of unassailable quality. A global greenhouse gas information system will likely require a combination of space-and air-based remote- sensing assets, ground-based measurements, carbon cycle modeling and self-reporting. The specific requirements on such a system will be shaped by the degree of international cooperation it enjoys and the needs of the policy regime it aims to support, which might range from verifying treaty obligations, to certifying the tradable permits and offsets underlying a market in greenhouse gas emission reductions, to providing a comprehensive inventory of high and low emitters that could be used by non-governmental organizations and other international actors. While some technical studies have examined particular system components in single scenarios, there remains a need for a comprehensive survey of the range of potential requirements, options, and strategies for the overall system. We have initiated such a survey and recently hosted a workshop which engaged a diverse community of stakeholders to begin synthesizing requirements for such a system, with an initial focus on carbon dioxide. In this paper we describe our plan for completing the definition of the requirements, options, and strategies for a global greenhouse gas monitoring system. We discuss our overall approach and provide a status on the initial requirements synthesis activity.

  17. Comparison on Human Resource Requirement between Manual and Automated Dispensing Systems.

    PubMed

    Noparatayaporn, Prapaporn; Sakulbumrungsil, Rungpetch; Thaweethamcharoen, Tanita; Sangseenil, Wunwisa

    2017-05-01

    This study was conducted to compare human resource requirement among manual, automated, and modified automated dispensing systems. Data were collected from the pharmacy department at the 2100-bed university hospital (Siriraj Hospital, Bangkok, Thailand). Data regarding the duration of the medication distribution process were collected by using self-reported forms for 1 month. The data on the automated dispensing machine (ADM) system were obtained from 1 piloted inpatient ward, whereas those on the manual system were the average of other wards. Data on dispensing, returned unused medication, and stock management processes under the traditional manual system and the ADM system were from actual activities, whereas the modified ADM system was modeled. The full-time equivalent (FTE) of each model was estimated for comparison. The result showed that the manual system required 46.84 FTEs of pharmacists and 132.66 FTEs of pharmacy technicians. By adding pharmacist roles on screening and verification under the ADM system, the ADM system required 117.61 FTEs of pharmacists. Replacing counting and filling medication functions by ADM has decreased the number of pharmacy technicians to 55.38 FTEs. After the modified ADM system canceled the return unused medication process, FTEs requirement for pharmacists and pharmacy technicians decreased to 69.78 and 51.90 FTEs, respectively. The ADM system decreased the workload of pharmacy technicians, whereas it required more time from pharmacists. However, the increased workload of pharmacists was associated with more comprehensive patient care functions, which resulted from the redesigned work process. Copyright © 2017. Published by Elsevier Inc.

  18. Geostationary platform systems concepts definition study. Volume 2A: Appendixes, book 1

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Appendixes addressing various aspects of a geostationary platform concepts definition study are given. Communication platform traffic requirements, video conferencing forecast, intersatellite link capacity requirements, link budgets, payload data, payload assignments, and platform synthesis are addressed.

  19. Exploration Medical System Trade Study Tools Overview

    NASA Technical Reports Server (NTRS)

    Mindock, J.; Myers, J.; Latorella, K.; Cerro, J.; Hanson, A.; Hailey, M.; Middour, C.

    2018-01-01

    ExMC is creating an ecosystem of tools to enable well-informed medical system trade studies. The suite of tools address important system implementation aspects of the space medical capabilities trade space and are being built using knowledge from the medical community regarding the unique aspects of space flight. Two integrating models, a systems engineering model and a medical risk analysis model, tie the tools together to produce an integrated assessment of the medical system and its ability to achieve medical system target requirements. This presentation will provide an overview of the various tools that are a part of the tool ecosystem. Initially, the presentation's focus will address the tools that supply the foundational information to the ecosystem. Specifically, the talk will describe how information that describes how medicine will be practiced is captured and categorized for efficient utilization in the tool suite. For example, the talk will include capturing what conditions will be planned for in-mission treatment, planned medical activities (e.g., periodic physical exam), required medical capabilities (e.g., provide imaging), and options to implement the capabilities (e.g., an ultrasound device). Database storage and configuration management will also be discussed. The presentation will include an overview of how these information tools will be tied to parameters in a Systems Modeling Language (SysML) model, allowing traceability to system behavioral, structural, and requirements content. The discussion will also describe an HRP-led enhanced risk assessment model developed to provide quantitative insight into each capability's contribution to mission success. Key outputs from these various tools, to be shared with the space medical and exploration mission development communities, will be assessments of medical system implementation option satisfaction of requirements and per-capability contributions toward achieving requirements.

  20. Verification and Validation of Requirements on the CEV Parachute Assembly System Using Design of Experiments

    NASA Technical Reports Server (NTRS)

    Schulte, Peter Z.; Moore, James W.

    2011-01-01

    The Crew Exploration Vehicle Parachute Assembly System (CPAS) project conducts computer simulations to verify that flight performance requirements on parachute loads and terminal rate of descent are met. Design of Experiments (DoE) provides a systematic method for variation of simulation input parameters. When implemented and interpreted correctly, a DoE study of parachute simulation tools indicates values and combinations of parameters that may cause requirement limits to be violated. This paper describes one implementation of DoE that is currently being developed by CPAS, explains how DoE results can be interpreted, and presents the results of several preliminary studies. The potential uses of DoE to validate parachute simulation models and verify requirements are also explored.

  1. Geosynchronous platform definition study. Volume 4, Part 1: Traffic analysis and system requirements for the baseline traffic model

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The traffic analyses and system requirements data generated in the study resulted in the development of two traffic models; the baseline traffic model and the new traffic model. The baseline traffic model provides traceability between the numbers and types of geosynchronous missions considered in the study and the entire spectrum of missions foreseen in the total national space program. The information presented pertaining to the baseline traffic model includes: (1) definition of the baseline traffic model, including identification of specific geosynchronous missions and their payload delivery schedules through 1990; (2) Satellite location criteria, including the resulting distribution of the satellite population; (3) Geosynchronous orbit saturation analyses, including the effects of satellite physical proximity and potential electromagnetic interference; and (4) Platform system requirements analyses, including satellite and mission equipment descriptions, the options and limitations in grouping satellites, and on-orbit servicing criteria (both remotely controlled and man-attended).

  2. A Feasibility Study on a Parallel Mechanism for Examining the Space Shuttle Orbiter Payload Bay Radiators

    NASA Technical Reports Server (NTRS)

    Roberts, Rodney G.; LopezdelCastillo, Eduardo

    1996-01-01

    The goal of the project was to develop the necessary analysis tools for a feasibility study of a cable suspended robot system for examining the space shuttle orbiter payload bay radiators These tools were developed to address design issues such as workspace size, tension requirements on the cable, the necessary accuracy and resolution requirements and the stiffness and movement requirements of the system. This report describes the mathematical models for studying the inverse kinematics, statics, and stiffness of the robot. Each model is described by a matrix. The manipulator Jacobian was also related to the stiffness matrix, which characterized the stiffness of the system. Analysis tools were then developed based on the singular value decomposition (SVD) of the corresponding matrices. It was demonstrated how the SVD can be used to quantify the robot's performance and to provide insight into different design issues.

  3. Study of V/STOL aircraft implementation. Volume 1: Summary

    NASA Technical Reports Server (NTRS)

    Portenier, W. J.; Webb, H. M.

    1973-01-01

    A high density short haul air market which by 1980 is large enough to support the introduction of an independent short haul air transportation system is discussed. This system will complement the existing air transportation system and will provide relief of noise and congestion problems at conventional airports. The study has found that new aircraft, exploiting V/STOL and quiet engine technology, can be available for implementing these new services, and they can operate from existing reliever and general aviation airports. The study has also found that the major funding requirements for implementing new short haul services could be borne by private capital, and that the government funding requirement would be minimal and/or recovered through the airline ticket tax. In addition, a suitable new short haul aircraft would have a market potential for $3.5 billion in foreign sales. The long lead times needed for aircraft and engine technology development will require timely actions by federal agencies.

  4. Pratt & Whitney ESCORT derivative for mars surface power

    NASA Astrophysics Data System (ADS)

    Feller, Gerald J.; Joyner, Russell

    1999-01-01

    The purpose of this paper is to address the applicability of a common reactor system design from the Pratt & Whitney ESCORT nuclear thermal rocket engine concept to support current NASA mars surface-based power requirements. The ESCORT is a bimodal engine capable of supporting a wide range of propulsive thermal and vehicle electrical power requirements. The ESCORT engine is powered by a fast-spectrum beryllium-reflected CERMET-fueled nuclear reactor. In addition to an expander cycle propulsive mode, the ESCORT is capable of operating in an electrical power mode. In this mode, the reactor is used to heat a mixture of helium and xenon to drive a closed-loop Brayton cycle in order to generate electrical energy. Recent Design Reference Mission requirements (DRM) from NASA Johnson Space Center and NASA Lewis Research Center studies in 1997 and 1998 have detailed upgraded requirements for potential mars transfer missions. The current NASA DRM requires a nuclear thermal propulsion system capable of delivering total mission requirements of 200170 N (45000 lbf) thrust and 50 kWe of spacecraft electrical power. Additionally, these requirements detailed a surface power system capable of providing approximately 160 kW of electrical energy over an approximate 10 year period within a given weight and volume envelope. Current NASA studies use a SP-100 reactor (0.8 MT) and a NERVA derivative (1.6 MT) as baseline systems. A mobile power cart of approximate dimensions 1.7 m×4.5 m×4.4 m has been conceptualized to transport the reactor power system on the Mars Surface. The 63.25 cm diameter and 80.25 cm height of the ESCORT and its 1.3 MT of weight fit well within the current weight and volume target range of the NASA DRM requirements. The modifications required to the ESCORT reactor system to support this upgraded electrical power requirements along with operation in the Martian atmospheric conditions are addressed in this paper. Sufficient excess reactivity and burnup capability were designed into the ESCORT reactor system to support these upgraded requirements. Only slight modifications to reactor hardware were required to address any environmental considerations. These modifications involved sealing any refractory metal alloy components from the CO2 in the Martian Atmosphere. Also, the Brayton cycle Power Conversion Unit (PCU) hardware was modified to support the upgraded requirements. This paper discusses the design analysis performed and provides information on the final common reactor concept to be used on the Mars surface to support manned missions.

  5. An Integrated Approach to Exploration Launch Office Requirements Development

    NASA Technical Reports Server (NTRS)

    Holladay, Jon B.; Langford, Gary

    2006-01-01

    The proposed paper will focus on the Project Management and Systems Engineering approach utilized to develop a set of both integrated and cohesive requirements for the Exploration Launch Office, within the Constellation Program. A summary of the programmatic drivers which influenced the approach along with details of the resulting implementation will be discussed as well as metrics evaluating the efficiency and accuracy of the various requirements development activities. Requirements development activities will focus on the procedures utilized to ensure that technical content was valid and mature in preparation for the Crew Launch Vehicle and Constellation System s Requirements Reviews. This discussion will begin at initial requirements development during the Exploration Systems Architecture Study and progress through formal development of the program structure. Specific emphasis will be given to development and validation of the requirements. This discussion will focus on approaches to garner the appropriate requirement owners (or customers), project infrastructure utilized to emphasize proper integration, and finally the procedure to technically mature, verify and validate the requirements. Examples of requirements being implemented on the Launch Vehicle (systems, interfaces, test & verification) will be utilized to demonstrate the various processes and also provide a top level understanding of the launch vehicle(s) performance goals. Details may also be provided on the approaches for verification, which range from typical aerospace hardware development (qualification/acceptance) through flight certification (flight test, etc.). The primary intent of this paper is to provide a demonstrated procedure for the development of a mature, effective, integrated set of requirements on a complex system, which also has the added intricacies of both heritage and new hardware development integration. Ancillary focus of the paper will include discussion of Test and Verification approaches along with top level systems/elements performance capabilities.

  6. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 3A. GSFLS technical analysis (appendix). Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kriger, A.

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. Amore » technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives.« less

  7. Earth resources mission performance studies. Volume 2: Simulation results

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Simulations were made at three month intervals to investigate the EOS mission performance over the four seasons of the year. The basic objectives of the study were: (1) to evaluate the ability of an EOS type system to meet a representative set of specific collection requirements, and (2) to understand the capabilities and limitations of the EOS that influence the system's ability to satisfy certain collection objectives. Although the results were obtained from a consideration of a two sensor EOS system, the analysis can be applied to any remote sensing system having similar optical and operational characteristics. While the category related results are applicable only to the specified requirement configuration, the results relating to general capability and limitations of the sensors can be applied in extrapolating to other U.S. based EOS collection requirements. The TRW general purpose mission simulator and analytic techniques discussed in this report can be applied to a wide range of collection and planning problems of earth orbiting imaging systems.

  8. An Open-Source Hardware and Software System for Acquisition and Real-Time Processing of Electrophysiology during High Field MRI

    PubMed Central

    Purdon, Patrick L.; Millan, Hernan; Fuller, Peter L.; Bonmassar, Giorgio

    2008-01-01

    Simultaneous recording of electrophysiology and functional magnetic resonance imaging (fMRI) is a technique of growing importance in neuroscience. Rapidly evolving clinical and scientific requirements have created a need for hardware and software that can be customized for specific applications. Hardware may require customization to enable a variety of recording types (e.g., electroencephalogram, local field potentials, or multi-unit activity) while meeting the stringent and costly requirements of MRI safety and compatibility. Real-time signal processing tools are an enabling technology for studies of learning, attention, sleep, epilepsy, neurofeedback, and neuropharmacology, yet real-time signal processing tools are difficult to develop. We describe an open source system for simultaneous electrophysiology and fMRI featuring low-noise (< 0.6 uV p-p input noise), electromagnetic compatibility for MRI (tested up to 7 Tesla), and user-programmable real-time signal processing. The hardware distribution provides the complete specifications required to build an MRI-compatible electrophysiological data acquisition system, including circuit schematics, print circuit board (PCB) layouts, Gerber files for PCB fabrication and robotic assembly, a bill of materials with part numbers, data sheets, and vendor information, and test procedures. The software facilitates rapid implementation of real-time signal processing algorithms. This system has used in human EEG/fMRI studies at 3 and 7 Tesla examining the auditory system, visual system, sleep physiology, and anesthesia, as well as in intracranial electrophysiological studies of the non-human primate visual system during 3 Tesla fMRI, and in human hyperbaric physiology studies at depths of up to 300 feet below sea level. PMID:18761038

  9. An open-source hardware and software system for acquisition and real-time processing of electrophysiology during high field MRI.

    PubMed

    Purdon, Patrick L; Millan, Hernan; Fuller, Peter L; Bonmassar, Giorgio

    2008-11-15

    Simultaneous recording of electrophysiology and functional magnetic resonance imaging (fMRI) is a technique of growing importance in neuroscience. Rapidly evolving clinical and scientific requirements have created a need for hardware and software that can be customized for specific applications. Hardware may require customization to enable a variety of recording types (e.g., electroencephalogram, local field potentials, or multi-unit activity) while meeting the stringent and costly requirements of MRI safety and compatibility. Real-time signal processing tools are an enabling technology for studies of learning, attention, sleep, epilepsy, neurofeedback, and neuropharmacology, yet real-time signal processing tools are difficult to develop. We describe an open-source system for simultaneous electrophysiology and fMRI featuring low-noise (<0.6microV p-p input noise), electromagnetic compatibility for MRI (tested up to 7T), and user-programmable real-time signal processing. The hardware distribution provides the complete specifications required to build an MRI-compatible electrophysiological data acquisition system, including circuit schematics, print circuit board (PCB) layouts, Gerber files for PCB fabrication and robotic assembly, a bill of materials with part numbers, data sheets, and vendor information, and test procedures. The software facilitates rapid implementation of real-time signal processing algorithms. This system has been used in human EEG/fMRI studies at 3 and 7T examining the auditory system, visual system, sleep physiology, and anesthesia, as well as in intracranial electrophysiological studies of the non-human primate visual system during 3T fMRI, and in human hyperbaric physiology studies at depths of up to 300 feet below sea level.

  10. Checkout systems: Summary report for the universal control and display console

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The development of a unified test equipment checkout concept based on a universal control and display console system is discussed. The checkout requirements are analyzed for the shuttle and space station. Capability, size, utilization requirements and specifications of the ground checkout system are made on the basis of engineering trade-off studies. Recommendations related to the attainment of overall unified test equipment conceptual goals and objectives are submitted.

  11. Nutrition and food technology for a Controlled Ecological Life Support System (CELSS)

    NASA Technical Reports Server (NTRS)

    Glaser, P. E.; Mabel, J. A.

    1981-01-01

    Food technology requirements and a nutritional strategy for a Controlled Ecological Life Support System (CELSS) to provide adequate food in an acceptable form in future space missions are discussed. The establishment of nutritional requirements, dietary goals, and a food service system to deliver acceptable foods in a safe and healthy form and the development of research goals and priorities were the main objectives of the study.

  12. Security for safety critical space borne systems

    NASA Technical Reports Server (NTRS)

    Legrand, Sue

    1987-01-01

    The Space Station contains safety critical computer software components in systems that can affect life and vital property. These components require a multilevel secure system that provides dynamic access control of the data and processes involved. A study is under way to define requirements for a security model providing access control through level B3 of the Orange Book. The model will be prototyped at NASA-Johnson Space Center.

  13. Requirements for Real-Time Laboratory Experimentation over the Internet.

    ERIC Educational Resources Information Center

    Salzmann, C.; Latchman, H. A.; Gillet, D.; Crisalle, O. D.

    A prototype system based on an inverted pendulum is used to study the Quality of Service and discuss requirements of remote-experimentation systems utilized for carrying out control engineering experiments over the Internet. This class of applications involves the transmission over the network of a variety of data types with their own peculiar…

  14. Rotor systems research aircraft predesign study. Volume 4: Preliminary draft detail specification

    NASA Technical Reports Server (NTRS)

    Miller, A. N.; Linden, A. W.

    1972-01-01

    The RSRA requirements are presented in a detail specification format. Coverage of the requirements includes the following headings: (1) aircraft characteristics, (2) general features of design and construction, (3) aerodynamics, (4) structural design criteria, (5) flight control system, (6) propulsion subsystem, and (7) secondary power and distribution subsystem.

  15. Proteomic approaches to study the pig intestinal system.

    PubMed

    Soler, Laura; Niewold, Theo A; Moreno, Ángela; Garrido, Juan Jose

    2014-03-01

    One of the major challenges in pig production is managing digestive health to maximize feed conversion and growth rates, but also to minimize treatment costs and to warrant public health. There is a great interest in the development of useful tools for intestinal health monitoring and the investigation of possible prophylactic/ therapeutic intervention pathways. A great variety of in vivo and in vitro intestinal models of study have been developed in the recent years. The understanding of such a complex system as the intestinal system (IS), and the study of its physiology and pathology is not an easy task. Analysis of such a complex system requires the use of systems biology techniques, like proteomics. However, for a correct interpretation of results and to maximize analysis performance, a careful selection of the IS model of study and proteomic platform is required. The study of the IS system is especially important in the pig, a species whose farming requires a very careful management of husbandry procedures regarding feeding and nutrition. The incorrect management of the pig digestive system leads directly to economic losses related suboptimal growth and feed utilization and/or the appearance of intestinal infections, in particular diarrhea. Furthermore, this species is the most suitable experimental model for human IS studies. Proteomics has risen as one of the most promising approaches to study the pig IS. In this review, we describe the most useful models of IS research in porcine and the different proteomic platforms available. An overview of the recent findings in pig IS proteomics is also provided.

  16. Solar electric propulsion and interorbital transportation

    NASA Technical Reports Server (NTRS)

    Austin, R. E.

    1978-01-01

    In-house MSFC and contracted systems studies have evaluated the requirements associated with candidate SEP missions and the results point to a standard system approach for both program flexibility and economy. The prospects for economical space transportation in the 1980s have already provided a stimulus for Space Industrialization (SI) planning. Two SI initiatives that are used as examples for interorbital transportation requirements are discussed - Public Service Platforms and Satellite Power System. The interorbital requirements for SI range from support of manned geosynchronous missions to transfers of bulk cargo and large-delicate space structures from low earth orbit to geosynchronous orbit.

  17. The MSFC Systems Engineering Guide: An Overview and Plan

    NASA Technical Reports Server (NTRS)

    Shelby, Jerry A.; Thomas, L. Dale

    2007-01-01

    As systems and subsystems requirements become more complex in the pursuit of the exploration of space, advanced technology will demand and require an integrated approach to the design and development of safe and successful space vehicles and there products. System engineers play a vital and key role in transforming mission needs into vehicle requirements that can be verified and validated. This will result in a safe and cost effective design that will satisfy the mission schedule. A key to successful vehicle design within systems engineering is communication. Communication, through a systems engineering infrastructure, will not only ensure that customers and stakeholders are satisfied but will also assist in identifying vehicle requirements; i.e. identification, integration and management. This vehicle design will produce a system that is verifiable, traceable, and effectively satisfies cost, schedule, performance, and risk throughout the life-cycle of the product. A communication infrastructure will bring about the integration of different engineering disciplines within vehicle design. A system utilizing these aspects will enhance system engineering performance and improve upon required activities such as Development of Requirements, Requirements Management, Functional Analysis, Test, Synthesis, Trade Studies, Documentation, and Lessons Learned to produce a successful final product. This paper will describe the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that will describe the system engineering processes that are used by MSFC in the development of complex systems such as the Ares launch vehicle. It is the intent of this website to be a "One Stop Shop" for our systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and references, and provide an archive of systems engineering artifacts produced by the many NASA projects developed and managed by MSFC over the years.

  18. Analysis of space systems for the space disposal of nuclear waste follow-on study. Volume 2. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-01-01

    Some of the conclusions reached as a result of this study are summarized. Waste form parameters for the reference cermet waste form are available only by analogy. Detail design of the waste payload would require determination of actual waste form properties. The billet configuration constraints for the cermet waste form limit the packing efficiency to slightly under 75% net volume. The effect of this packing inefficiency in reducing the net waste form per waste payload can be seen graphically. The cermet waste form mass per unit mass of waste payload is lower than that of the iodine waste form evenmore » though the cermet has a higher density (6.5 versus 5.5). This is because the lead iodide is cast achieving almost 100% efficiency in packing. This inefficiency in the packing of the cermet results in a 20% increase in number of flights which increases both cost and risk. Alternative systems for waste mixes requiring low flight rates (technetium-99, iodine-129) can make effective use of the existing 65K space transportation system in either single- or dual-launch scenarios. A comprehensive trade study would be required to select the optimum orbit transfer system for low-launch-rate systems. This study was not conducted as part of the present effort due to selection of the cermet waste form as the reference for the study. Several candidates look attractive for both single- and dual-launch systems (see sec. 4.4), but due to the relatively small number of missions, a comprehensive comparison of life cycle costs including DDT and E would be required to select the best system. The reference system described in sections 5.0, 6.0, 7.0, and 8.0 offers the best combination of cost, risk, and alignment with ongoing NASA technology development efforts for disposal of the reference cermet waste form.« less

  19. A study of flight control requirements for advanced, winged, earth-to-orbit vehicles with far-aft center-of-gravity locations

    NASA Technical Reports Server (NTRS)

    Hepler, A. K.; Zeck, H.; Walker, W. H.; Polack, A.

    1982-01-01

    Control requirements of Controlled Configured Design Approach vehicles with far-aft center of gravity locations are studied. The baseline system investigated is a fully reusable vertical takeoff/horizontal landing single stage-to-orbit vehicle with mission requirements similar to that of the space shuttle vehicle. Evaluations were made to determine dynamic stability boundaries, time responses, trim control, operational center-of-gravity limits, and flight control subsystem design requirements. Study tasks included a baseline vehicle analysis, an aft center of gravity study, a payload size study, and a technology assessment.

  20. Crew/computer communications study. Volume 1: Final report. [onboard computerized communications system for spacecrews

    NASA Technical Reports Server (NTRS)

    Johannes, J. D.

    1974-01-01

    Techniques, methods, and system requirements are reported for an onboard computerized communications system that provides on-line computing capability during manned space exploration. Communications between man and computer take place by sequential execution of each discrete step of a procedure, by interactive progression through a tree-type structure to initiate tasks or by interactive optimization of a task requiring man to furnish a set of parameters. Effective communication between astronaut and computer utilizes structured vocabulary techniques and a word recognition system.

  1. Identification of specific requirements for a NASA aerospace law information system and identification of the acquisition requirements for an aerospace law collection for the NASA law library

    NASA Technical Reports Server (NTRS)

    Morenoff, J.; Roth, D. L.; Singleton, J. W.

    1972-01-01

    The study to develop, implement, and maintain a space law library and information system is summarized. The survey plan; major interviews with individuals representative of potential sources, users and producers of information related to aerospace law; and system trade-off analyses are discussed along with the NASA/RECON system capability. The NASA publications of STAR and IAA are described, and the NASA legal micro-thesaurus is included.

  2. Worthy test programmes and developments of smart electromechanical actuators

    NASA Astrophysics Data System (ADS)

    Annaz, Fawaz Yahya

    2007-02-01

    Early aircraft flight control systems were totally manually operated, that is, the force required to move flight control surfaces was generated by the pilot and transmitted by cables and rods. As aerodynamics and airframe technology developed and speeds increased, the forces required to move control surfaces increased, as did the number of surfaces. In order to provide the extra power required, hydraulic technology was introduced. To date, the common element in the development of flight control systems has been, mainly, restricted to this type of technology. This is because of its proven reliability and the lack of alternative technologies. However, the technology to build electromechanically actuated primary flight control systems is now available. Motors developing the required power at the required frequencies are now possible (with the use of high energy permanent magnetic materials and compact high speed electronic circuits). It is this particular development which may make the concept of an 'all electric aircraft' realizable in the near future. The purpose of the all electric aircraft concept is the consolidation of all secondary power systems into electric power. The elimination of hydraulic and pneumatic secondary power systems will improve maintainability, flight readiness and use of energy. This paper will present the development of multi-lane smart electric actuators and offer an insight into other subsequent fields of study. The key areas of study may be categorized as follows. State of the art hydraulic actuators. Electromechanical actuator system test programmes. Development of electromechanical actuators. Modelling of electromechanical actuators.

  3. Navigation and guidance requirements for commercial VTOL operations

    NASA Technical Reports Server (NTRS)

    Hoffman, W. C.; Hollister, W. M.; Howell, J. D.

    1974-01-01

    The NASA Langley Research Center (LaRC) has undertaken a research program to develop the navigation, guidance, control, and flight management technology base needed by Government and industry in establishing systems design concepts and operating procedures for VTOL short-haul transportation systems in the 1980s time period. The VALT (VTOL Automatic Landing Technology) Program encompasses the investigation of operating systems and piloting techniques associated with VTOL operations under all-weather conditions from downtown vertiports; the definition of terminal air traffic and airspace requirements; and the development of avionics including navigation, guidance, controls, and displays for automated takeoff, cruise, and landing operations. The program includes requirements analyses, design studies, systems development, ground simulation, and flight validation efforts.

  4. Horizontal Collision Avoidance Systems Study

    DOT National Transportation Integrated Search

    1973-12-01

    This report presents the results of an analytical study of the merits and mechanization requirements of horizontal collision avoidance systems (CAS). The horizontal and combined horizontal/vertical maneuvers which provide adequate miss distance with ...

  5. Vehicle Health Management Communications Requirements for AeroMACS

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert J.; Clements, Donna J.; Apaza, Rafael D.

    2012-01-01

    As the development of standards for the aeronautical mobile airport communications system (AeroMACS) progresses, the process of identifying and quantifying appropriate uses for the system is progressing. In addition to defining important elements of AeroMACS standards, indentifying the systems uses impacts AeroMACS bandwidth requirements. Although an initial 59 MHz spectrum allocation for AeroMACS was established in 2007, the allocation may be inadequate; studies have indicated that 100 MHz or more of spectrum may be required to support airport surface communications. Hence additional spectrum allocations have been proposed. Vehicle health management (VHM) systems, which can produce large volumes of vehicle health data, were not considered in the original bandwidth requirements analyses, and are therefore of interest in supporting proposals for additional AeroMACS spectrum. VHM systems are an emerging development in air vehicle safety, and preliminary estimates of the amount of data that will be produced and transmitted off an aircraft, both in flight and on the ground, have been prepared based on estimates of data produced by on-board vehicle health sensors and initial concepts of data processing approaches. This allowed an initial estimate of VHM data transmission requirements for the airport surface. More recently, vehicle-level systems designed to process and analyze VHM data and draw conclusions on the current state of vehicle health have been undergoing testing and evaluation. These systems make use of vehicle system data that is mostly different from VHM data considered previously for airport surface transmission, and produce processed system outputs that will be also need to be archived, thus generating additional data load for AeroMACS. This paper provides an analysis of airport surface data transmission requirements resulting from the vehicle level reasoning systems, within the context of overall VHM data requirements.

  6. Multispectral scanner data applications evaluation. Volume 1: User applications study

    NASA Technical Reports Server (NTRS)

    Thomson, F. J.; Erickson, J. D.; Nalepka, R. F.; Weber, J. D.

    1974-01-01

    A six-month systems study of earth resource surveys from satellites was conducted and is reported. SKYLAB S-192 multispectral scanner (MSS) data were used as a baseline to aid in evaluating the characteristics of future systems using satellite MSS sensors. The study took the viewpoint that overall system (sensor and processing) characteristics and parameter values should be determined largely by user requirements for automatic information extraction performance in quasi-operational earth resources surveys, the other major factor being hardware limitations imposed by state-of-the-art technology and cost. The objective was to use actual aircraft and spacecraft MSS data to outline parametrically the trade-offs between user performance requirements and hardware performance and limitations so as to allow subsequent evaluation of compromises which must be made in deciding what system(s) to build.

  7. Acquisition/expulsion system for earth orbital propulsion system study. Volume 5: Earth storable design

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A comprehensive analysis and parametric design effort was conducted under the earth-storable phase of the program. Passive Acquisition/expulsion system concepts were evaluated for a reusable Orbital Maneuvering System (OMS) application. The passive surface tension technique for providing gas free liquid on demand was superior to other propellant acquisition methods. Systems using fine mesh screens can provide the requisite stability and satisfy OMS mission requirements. Both fine mesh screen liner and trap systems were given detailed consideration in the parametric design, and trap systems were selected for this particular application. These systems are compatible with the 100- to 500-manned mission reuse requirements.

  8. Radiology Reporting System Data Exchange With the Electronic Health Record System: A Case Study in Iran.

    PubMed

    Ahmadi, Maryam; Ghazisaeidi, Marjan; Bashiri, Azadeh

    2015-03-18

    In order to better designing of electronic health record system in Iran, integration of health information systems based on a common language must be done to interpret and exchange this information with this system is required. This study provides a conceptual model of radiology reporting system using unified modeling language. The proposed model can solve the problem of integration this information system with the electronic health record system. By using this model and design its service based, easily connect to electronic health record in Iran and facilitate transfer radiology report data. This is a cross-sectional study that was conducted in 2013. The study population was 22 experts that working at the Imaging Center in Imam Khomeini Hospital in Tehran and the sample was accorded with the community. Research tool was a questionnaire that prepared by the researcher to determine the information requirements. Content validity and test-retest method was used to measure validity and reliability of questioner respectively. Data analyzed with average index, using SPSS. Also Visual Paradigm software was used to design a conceptual model. Based on the requirements assessment of experts and related texts, administrative, demographic and clinical data and radiological examination results and if the anesthesia procedure performed, anesthesia data suggested as minimum data set for radiology report and based it class diagram designed. Also by identifying radiology reporting system process, use case was drawn. According to the application of radiology reports in electronic health record system for diagnosing and managing of clinical problem of the patient, with providing the conceptual Model for radiology reporting system; in order to systematically design it, the problem of data sharing between these systems and electronic health records system would eliminate.

  9. Unmanned Aircraft System Control and ATC Communications Bandwidth Requirements

    NASA Technical Reports Server (NTRS)

    Henriksen, Steve

    2008-01-01

    There are significant activities taking place to establish the procedures and requirements for safe and routine operation of unmanned aircraft systems (UAS) in the National Airspace System (NAS). Among the barriers to overcome in achieving this goal is the lack of sufficient frequency spectrum necessary for the UAS control and air traffic control (ATC) communications links. This shortcoming is compounded by the fact that the UAS control communications links will likely be required to operate in protected frequency spectrum, just as ATC communications links are, because they relate to "safety and regularity of flight." To support future International Telecommunications Union (ITU) World Radio Conference (WRC) agenda items concerning new frequency allocations for UAS communications links, and to augment the Future Communications Study (FCS) Technology Evaluation Group efforts, NASA Glenn Research Center has sponsored a task to estimate the UAS control and ATC communications bandwidth requirements for safe, reliable, and routine operation of UAS in the NAS. This report describes the process and results of that task. The study focused on long-term bandwidth requirements for UAS approximately through 2030.

  10. Radiatively coupled thermionic and thermoelectric power system concept

    NASA Technical Reports Server (NTRS)

    Shimada, K.; Ewell, R.

    1981-01-01

    The study presented showed that the large power systems (about 100 kW) utilizing radiatively coupled thermionic or thermoelectric converters could be designed so that the power subsystem could be contained in a Space Shuttle bay as a part of an electrically propelled spacecraft. The radiatively coupled system requires a large number of individual converters since the transferred heat is smaller than with the conductively coupled system, but the advantages of the new system indicates merit for further study. The advantages are (1) good electrical isolation between converters and the heat source, (2) physical separation of converters from the heat source (making the system fabrication manageable), and (3) elimination of radiator heat pipes, which are required in an all-heat-pipe power system. In addition, the specific weight of the radiatively coupled power systems favorably compares with that of the all-heat-pipe systems.

  11. 7 CFR 277.18 - Establishment of an Automated Data Processing (ADP) and Information Retrieval System.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... activities and expenditures in relation to the approved Planning APD or Implementation APD. An APDU may also... organizations other than the State agency to perform such tasks as feasibility studies, system studies, system... requirements of § 277.18(c). Feasibility Study means a preliminary study to determine whether it is...

  12. Geostationary platform systems concepts definition study. Volume 2: Technical, book 3

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The supporting research and technology, and space demonstrations required to support the 1990s operational geostationary platforms are identified. Also the requirements on and interfaces with the Space Transportation System hardware elements supporting the geostationary platform program, including the shuttle, orbital transfer vehicles, teleoperator, etc., are investigated to provide integrated support requirements. Finally, a preliminary evaluation of the practicability and capabilities of an experimental platform from the standpoint of technology, schedule, and cost is given.

  13. Thrust Vector Control for Nuclear Thermal Rockets

    NASA Technical Reports Server (NTRS)

    Ensworth, Clinton B. F.

    2013-01-01

    Future space missions may use Nuclear Thermal Rocket (NTR) stages for human and cargo missions to Mars and other destinations. The vehicles are likely to require engine thrust vector control (TVC) to maintain desired flight trajectories. This paper explores requirements and concepts for TVC systems for representative NTR missions. Requirements for TVC systems were derived using 6 degree-of-freedom models of NTR vehicles. Various flight scenarios were evaluated to determine vehicle attitude control needs and to determine the applicability of TVC. Outputs from the models yielded key characteristics including engine gimbal angles, gimbal rates and gimbal actuator power. Additional factors such as engine thrust variability and engine thrust alignment errors were examined for impacts to gimbal requirements. Various technologies are surveyed for TVC systems for the NTR applications. A key factor in technology selection is the unique radiation environment present in NTR stages. Other considerations including mission duration and thermal environments influence the selection of optimal TVC technologies. Candidate technologies are compared to see which technologies, or combinations of technologies best fit the requirements for selected NTR missions. Representative TVC systems are proposed and key properties such as mass and power requirements are defined. The outputs from this effort can be used to refine NTR system sizing models, providing higher fidelity definition for TVC systems for future studies.

  14. Space Transfer Vehicle Concepts and Requirements Study. Volume 2, Book 2: System and Program Requirements Trade Studies

    NASA Technical Reports Server (NTRS)

    Weber, Gary A.

    1991-01-01

    During the 90-day study, support was provided to NASA in defining a point-of-departure space transfer vehicle (STV). The resulting STV concept was performance optimized with a two-stage LTV/LEV configuration. Appendix A reports on the effort during this period of the study. From the end of the 90-day study until the March Interim Review, effort was placed on optimizing the two-stage vehicle approach identified in the 90-day effort. After the March Interim Review, the effort was expanded to perform a full architectural trade study with the intent of developing a decision database to support STV system decisions in response to changing SEI infrastructure concepts. Several of the architecture trade studies were combined in a System Architecture Trade Study. In addition to this trade, system optimization/definition trades and analyses were completed and some special topics were addressed. Program- and system-level trade study and analyses methodologies and results are presented in this section. Trades and analyses covered in this section are: (1) a system architecture trade study; (2) evolution; (3) safety and abort considerations; (4) STV as a launch vehicle upper stage; and (5) optimum crew and cargo split.

  15. The effect of requirements prioritization on avionics system conceptual design

    NASA Astrophysics Data System (ADS)

    Lorentz, John

    This dissertation will provide a detailed approach and analysis of a new collaborative requirements prioritization methodology that has been used successfully on four Coast Guard avionics acquisition and development programs valued at $400M+. A statistical representation of participant study results will be discussed and analyzed in detail. Many technically compliant projects fail to deliver levels of performance and capability that the customer desires. Some of these systems completely meet "threshold" levels of performance; however, the distribution of resources in the process devoted to the development and management of the requirements does not always represent the voice of the customer. This is especially true for technically complex projects such as modern avionics systems. A simplified facilitated process for prioritization of system requirements will be described. The collaborative prioritization process, and resulting artifacts, aids the systems engineer during early conceptual design. All requirements are not the same in terms of customer priority. While there is a tendency to have many thresholds inside of a system design, there is usually a subset of requirements and system performance that is of the utmost importance to the design. These critical capabilities and critical levels of performance typically represent the reason the system is being built. The systems engineer needs processes to identify these critical capabilities, the associated desired levels of performance, and the risks associated with the specific requirements that define the critical capability. The facilitated prioritization exercise is designed to collaboratively draw out these critical capabilities and levels of performance so they can be emphasized in system design. Developing the purpose, scheduling and process for prioritization events are key elements of systems engineering and modern project management. The benefits of early collaborative prioritization flow throughout the project schedule, resulting in greater success during system deployment and operational testing. This dissertation will discuss the data and findings from participant studies, present a literature review of systems engineering and design processes, and test the hypothesis that the prioritization process had no effect on stakeholder sentiment related to the conceptual design. In addition, the "Requirements Rationalization" process will be discussed in detail. Avionics, like many other systems, has transitioned from a discrete electronics engineering, hard engineering discipline to incorporate software engineering as a core process of the technology development cycle. As with other software-based systems, avionics now has significant soft system attributes that must be considered in the design process. The boundless opportunities that exist in software design demand prioritization to focus effort onto the critical functions that the software must provide. This has been a well documented and understood phenomenon in the software development community for many years. This dissertation will attempt to link the effect of software integrated avionics to the benefits of prioritization of requirements in the problem space and demonstrate the sociological and technical benefits of early prioritization practices.

  16. Low NO(x) Combustor Development

    NASA Technical Reports Server (NTRS)

    Kastl, J. A.; Herberling, P. V.; Matulaitis, J. M.

    2005-01-01

    The goal of these efforts was the development of an ultra-low emissions, lean-burn combustor for the High Speed Civil Transport. The HSCT Mach 2.4 FLADE C1 Cycle was selected as the baseline engine cycle. A preliminary compilation of performance requirements for the HSCT combustor system was developed. The emissions goals of the program, baseline engine cycle, and standard combustor performance requirements were considered in developing the compilation of performance requirements. Seven combustor system designs were developed. The development of these system designs was facilitated by the use of spreadsheet-type models which predicted performance of the combustor systems over the entire flight envelope of the HSCT. A chemical kinetic model was developed for an LPP combustor and employed to study NO(x) formation kinetics, and CO burnout. These predictions helped to define the combustor residence time. Five fuel-air mixer concepts were analyzed for use in the combustor system designs. One of the seven system designs, one using the Swirl-Jet and Cyclone Swirler fuel-air mixers, was selected for a preliminary mechanical design study.

  17. Tracking and data relay satellite system configuration and tradeoff study. Volume 4: TDRS system operation and control and telecommunications service system, part 1

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Major study areas treated in this volume are: 1) operations and control and 2) the telecommunication service system. The TDRS orbit selection, orbital deployment, ground station visibility, sequence of events from launch to final orbit position, and TDRS control center functions required for stationkeeping, repositioning, attitude control, and antenna pointing are briefly treated as part of the operations and control section. The last topic of this section concerns the operations required for efficiently providing the TDRSS user telecommunication services. The discussion treats functions of the GSFC control and data processing facility, ground station, and TDRS control center. The second major portion of this volume deals with the Telecommunication Service System (TSS) which consists of the ground station, TDRS communication equipment and the user transceiver. A summary of the requirements and objectives for the telecommunication services and a brief summary of the TSS capabilities is followed by communication system analysis, signal design, and equipment design. Finally, descriptions of the three TSS elements are presented.

  18. Performance related issues in distributed database systems

    NASA Technical Reports Server (NTRS)

    Mukkamala, Ravi

    1991-01-01

    The key elements of research performed during the year long effort of this project are: Investigate the effects of heterogeneity in distributed real time systems; Study the requirements to TRAC towards building a heterogeneous database system; Study the effects of performance modeling on distributed database performance; and Experiment with an ORACLE based heterogeneous system.

  19. Closed Loop Requirements and Analysis Management

    NASA Technical Reports Server (NTRS)

    Lamoreaux, Michael; Verhoef, Brett

    2015-01-01

    Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed.

  20. Convolutional code performance in planetary entry channels

    NASA Technical Reports Server (NTRS)

    Modestino, J. W.

    1974-01-01

    The planetary entry channel is modeled for communication purposes representing turbulent atmospheric scattering effects. The performance of short and long constraint length convolutional codes is investigated in conjunction with coherent BPSK modulation and Viterbi maximum likelihood decoding. Algorithms for sequential decoding are studied in terms of computation and/or storage requirements as a function of the fading channel parameters. The performance of the coded coherent BPSK system is compared with the coded incoherent MFSK system. Results indicate that: some degree of interleaving is required to combat time correlated fading of channel; only modest amounts of interleaving are required to approach performance of memoryless channel; additional propagational results are required on the phase perturbation process; and the incoherent MFSK system is superior when phase tracking errors are considered.

  1. An airline study of advanced technology requirements for advanced high speed commercial transport engines. 2: Engine preliminary design assessment

    NASA Technical Reports Server (NTRS)

    Sallee, G. P.

    1973-01-01

    The advanced technology requirements for an advanced high speed commercial transport engine are presented. The results of the phase 2 study effort cover the following areas: (1) general review of preliminary engine designs suggested for a future aircraft, (2) presentation of a long range view of airline propulsion system objectives and the research programs in noise, pollution, and design which must be undertaken to achieve the goals presented, (3) review of the impact of propulsion system unreliability and unscheduled maintenance on cost of operation, (4) discussion of the reliability and maintainability requirements and guarantees for future engines.

  2. One third of the world - A review of Pacific islands telecommunications requirements

    NASA Technical Reports Server (NTRS)

    Hurd, J. N.

    1982-01-01

    This paper describes the Pacific Basin Communications Study, an assessment of Pacific islands telecommunications requirements, recently completed by the Public Service Satellite Consortium under contract with the National Aeronautics and Space Administration (NASA). The study describes extant and planned telecommunications systems in the region, examines user needs in terms of the development of governmental, social and commercial activities, and proposes and describes alternative technological solutions to communications problems. Questions of financing, implementation, management, costs and benefits of a regional telecommunications system are discussed. This paper describes user requirements based on six months of field investigation and technological options for improving telecommunications in the Pacific islands.

  3. The role of man in flight experiment payload missions. Volume 2: Appendices

    NASA Technical Reports Server (NTRS)

    Malone, T. B.

    1973-01-01

    In the study to determine the role of man in Sortie Lab operations, a functional model of a generalized experiment system was developed. The results are presented of a requirements analysis which was conducted to identify performance requirements, information requirements, and interface requirements associated with each function in the model.

  4. Astrometric Telescope Facility isolation and pointing study

    NASA Technical Reports Server (NTRS)

    Hibble, William; Allen, Terry; Jackson, Louis; Medbery, James; Self, Richard

    1988-01-01

    The Astrometric Telescope Facility (ATF), an optical telescope designed to detect extrasolar planetary systems, is scheduled to be a major user of the Space Station's Payload Pointing System (PPS). However, because the ATF has such a stringent pointing stability specification and requires + or - 180 deg roll about its line of sight, mechanisms to enhance the basic PPS capability are required. The ATF pointing performance achievable by the addition of a magnetic isolation and pointing system (MIPS) between the PPS upper gimbal and the ATF, and separately, by the addition of a passive isolation system between the Space Station and the PPS base was investigated. The candidate MIPS can meet the ATF requirements in the presence of a 0.01 g disturbance. It fits within the available annular region between the PPS and the ATF while meeting power and weight limitations and providing the required roll motion, payload data and power services. By contrast, the passive base isolator system must have an unrealistically low isolation bandwidth on all axes to meet ATF pointing requirements and does not provide roll about the line of sight.

  5. Adaptation of a web-based, open source electronic medical record system platform to support a large study of tuberculosis epidemiology

    PubMed Central

    2012-01-01

    Background In 2006, we were funded by the US National Institutes of Health to implement a study of tuberculosis epidemiology in Peru. The study required a secure information system to manage data from a target goal of 16,000 subjects who needed to be followed for at least one year. With previous experience in the development and deployment of web-based medical record systems for TB treatment in Peru, we chose to use the OpenMRS open source electronic medical record system platform to develop the study information system. Supported by a core technical and management team and a large and growing worldwide community, OpenMRS is now being used in more than 40 developing countries. We adapted the OpenMRS platform to better support foreign languages. We added a new module to support double data entry, linkage to an existing laboratory information system, automatic upload of GPS data from handheld devices, and better security and auditing of data changes. We added new reports for study managers, and developed data extraction tools for research staff and statisticians. Further adaptation to handle direct entry of laboratory data occurred after the study was launched. Results Data collection in the OpenMRS system began in September 2009. By August 2011 a total of 9,256 participants had been enrolled, 102,274 forms and 13,829 laboratory results had been entered, and there were 208 users. The system is now entirely supported by the Peruvian study staff and programmers. Conclusions The information system served the study objectives well despite requiring some significant adaptations mid-stream. OpenMRS has more tools and capabilities than it did in 2008, and requires less adaptations for future projects. OpenMRS can be an effective research data system in resource poor environments, especially for organizations using or considering it for clinical care as well as research. PMID:23131180

  6. Systems Engineering Case Studies: Synopsis of the Learning Principles

    DTIC Science & Technology

    2010-05-17

    Engineering Case Study HST refers to the Hubble Space Telescope Systems Engineering Case Study TBMCS refers to the Theater Battle Management Core System...going to orbit undetected in spite of substantial evidence that could have been used to prevent this occurrence. TBMCS /1 Requirements Definition...baseline was volatile up to system acceptance, which took place after TBMCS passed operational test and evaluation. TBMCS /2 System Architecture The

  7. Satellite Power Systems (SPS) concept definition study. Volume 6: SPS technology requirements and verification

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Volume 6 of the SPS Concept Definition Study is presented and also incorporates results of NASA/MSFC in-house effort. This volume includes a supporting research and technology summary. Other volumes of the final report that provide additional detail are as follows: (1) Executive Summary; (2) SPS System Requirements; (3) SPS Concept Evolution; (4) SPS Point Design Definition; (5) Transportation and Operations Analysis; and Volume 7, SPS Program Plan and Economic Analysis.

  8. Study of advanced atmospheric entry systems for Mars

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Entry system designs are described for various advanced Mars missions including sample return, hard lander, and Mars airplane. The Mars exploration systems for sample return and the hard lander require decleration from direct approach entry velocities of about 6 km/s to terminal velocities consistent with surface landing requirements. The Mars airplane entry system is decelerated from orbit at 4.6 km/s to deployment near the surface. Mass performance characteristics of major elements of the Mass performance characteristics are estimated for the major elements of the required entry systems using Viking technology or logical extensions of technology in order to provide a common basis of comparison for the three entry modes mission mode approaches. The entry systems, although not optimized, are based on Viking designs and reflect current hardware performance capability and realistic mass relationships.

  9. Analysis of remote operating systems for space-based servicing operations, volume 1

    NASA Technical Reports Server (NTRS)

    1985-01-01

    A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.

  10. Information security requirements in patient-centred healthcare support systems.

    PubMed

    Alsalamah, Shada; Gray, W Alex; Hilton, Jeremy; Alsalamah, Hessah

    2013-01-01

    Enabling Patient-Centred (PC) care in modern healthcare requires the flow of medical information with the patient between different healthcare providers as they follow the patient's treatment plan. However, PC care threatens the stability of the balance of information security in the support systems since legacy systems fall short of attaining a security balance when sharing their information due to compromises made between its availability, integrity, and confidentiality. Results show that the main reason for this is that information security implementation in discrete legacy systems focused mainly on information confidentiality and integrity leaving availability a challenge in collaboration. Through an empirical study using domain analysis, observations, and interviews, this paper identifies a need for six information security requirements in legacy systems to cope with this situation in order to attain the security balance in systems supporting PC care implementation in modern healthcare.

  11. Using a data base management system for modelling SSME test history data

    NASA Technical Reports Server (NTRS)

    Abernethy, K.

    1985-01-01

    The usefulness of a data base management system (DBMS) for modelling historical test data for the complete series of static test firings for the Space Shuttle Main Engine (SSME) was assessed. From an analysis of user data base query requirements, it became clear that a relational DMBS which included a relationally complete query language would permit a model satisfying the query requirements. Representative models and sample queries are discussed. A list of environment-particular evaluation criteria for the desired DBMS was constructed; these criteria include requirements in the areas of user-interface complexity, program independence, flexibility, modifiability, and output capability. The evaluation process included the construction of several prototype data bases for user assessement. The systems studied, representing the three major DBMS conceptual models, were: MIRADS, a hierarchical system; DMS-1100, a CODASYL-based network system; ORACLE, a relational system; and DATATRIEVE, a relational-type system.

  12. Conceptual study of space plane powered by hypersonic airbreathing propulsion system

    NASA Astrophysics Data System (ADS)

    Maita, Masataka; Ohkami, Yoshiaki; Yamanaka, Tatsuo; Mori, Takashige

    1990-10-01

    The paper describes the investigations of aerospace plane concept, conducted by the National Aerospace Laboratory (NAL) of Japan, with particular attention given to a concept which integrates a scram/liquid air cycle engine (LACE) hypersonic propulsion system fueling with slush hydrogen. The key requirements in achieving the space plane using scram/LACE propulsion system are described along with the mission requirements and the vehicle characteristics. Typical outputs of SSTO analysis are presented.

  13. Analytical Study of Cockpit Information Requirements.

    DTIC Science & Technology

    1981-04-01

    monitoring and control of engine case heating and cooling . Generally, the crew will be buffered from these changes by the increasingly more...advantages of color for prioritization, data separation and added dimensionality should apply equally well here as with conventional EADI and EHSI formats...addition of position/time control to a 3-D RNAV system converts it into a 4-D system. A 3-D system requires the addition of a time source plus software

  14. Instrument constraints and interface specifications. Earth Observatory Satellite system definition study (EOS)

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The equipment specifications for the thematic mapper and high resolution pointable imager for use on the Earth Observatory Satellite (EOS) are presented. The interface requirements of the systems are defined. The interface requirements are extracted from the equipment specifications and are intended as a summary to be used by the system and spacecraft designer. The appropriate documentation from which the specifications of the equipment are established are identified.

  15. Satellite Power Systems (SPS) concept definition study. Volume 5: Special emphasis studies. [rectenna and solar power satellite design studies

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    Satellite configurations based on the Satellite Power System baseline requirements were analyzed and a preferred concept selected. A satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Rectenna construction requirement were also addressed. Mass flow to orbit requirements were revised and traffic models established based on construction of 60 instead of 120 satellites. Analyses were conducted to determine satellite control, resources, manufacturing, and propellant requirements. The impact of the laser beam used for space-to-Earth power transmission upon the intervening atmosphere was examined as well as the inverse effect. The significant space environments and their effects on spacecraft components were investigated to define the design and operational limits imposed by the environments on an orbit transfer vehicle. The results show that LEO altitude 300 nmi and transfer orbit duration 6 months are preferrable.

  16. A study to define a set of requirements for cleansing agents for use in the Space Station whole body shower

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The objective of this research is to define a set of requirements for a whole body cleansing agent to be used in the Space Station Whole Body Shower System. In addition, cleansing agent candidates are to be identified that are likely to satisfy requirements defined in the first part of the study. It is understood that the main reason for having a Whole Body Shower is to satisfy the physiological, psychological and social needs of the crew throughout the duration of duty in the Space Station. The cleansing agent must also be compatible with the vortex water/gas separator and the water reclamation system. To accomplish these goals the study was divided into six tasks.

  17. Gas Turbine Characteristics for a Large Civil Tilt-Rotor (LCTR)

    NASA Technical Reports Server (NTRS)

    Snyder, Christopher A.; Thurman, Douglas R.

    2010-01-01

    In support of the Fundamental Aeronautics Program, Subsonic Rotary Wing Project; an engine system study has been undertaken to help define and understand some of the major gas turbine engine parameters required to meet performance and weight requirements as defined by earlier vehicle system studies. These previous vehicle studies will be reviewed to help define gas turbine performance goals. Assumptions and analysis methods used will be described. Performance and weight estimates for a few conceptual gas turbine engines meeting these requirements will be given and discussed. Estimated performance for these conceptual engines over a wide speed variation (down to 50 percent power turbine rpm at high torque) will be presented. Finally, areas needing further effort will be suggested and discussed.

  18. Does a new steam meal catering system meet patient requirements in hospital?

    PubMed

    Hickson, M; Fearnley, L; Thomas, J; Evans, S

    2007-10-01

    It has been consistently observed that a significant proportion of hospital inpatients are malnourished and many actually develop malnutrition in hospital. The NHS provides over 300 million meals each year at a cost of pound 500 million, yet there is relatively little research evaluating how well different catering systems provide for the needs of hospital inpatients. The aim of the study was to: (i) evaluate whether a new steam meal catering system (Steamplicity) enables patients in theory to meet their energy requirements in hospital and (ii) compare energy and protein intake using Steamplicity with a traditional bulk cook-chill system. Patients not at nutritional risk had their food intake at one lunchtime assessed. Energy intake was compared with the patients' energy requirements and energy and protein intake were compared with previous data from a bulk system. Fifty-seven patients had a median daily energy requirement of 7648 kJ (1821 kcal) [inter-quartile range (IQR): 6854-9164 kJ]. Assuming 30% [2293 kJ (546 kcal)] should be supplied by the lunch meal the average intake of 1369 kJ (326 kcal) fell short by 40%. Patients served meals from Steamplicity ate less energy [1369 kJ versus 1562 kJ (326 kcal versus 372 kcal) P = 0.04] but similar protein (18 g versus 19 g P = 0.34) to the bulk system. The largest difference was the energy provided by the dessert since the bulk system served more hot high-calorie desserts. Patient intakes did not meet their estimated requirements. The patients in this study were eating well and not at nutritional risk, thus patients with a poor appetite will be even less likely to meet their nutritional requirements. Steamplicity meals result in a lower energy intake than meals from a bulk cook-chill system, but similar protein intakes.

  19. Concept definition study for recovery of tumbling satellites. Volume 1: Executive summary, study results

    NASA Technical Reports Server (NTRS)

    Cable, D. A.; Derocher, W. L., Jr.; Cathcart, J. A.; Keeley, M. G.; Madayev, L.; Nguyen, T. K.; Preese, J. R.

    1986-01-01

    The first assessment is made of the design requirements and conceptual definition of a front end kit to be transported on the currently defined Orbital Maneuvering Vehicle (OMV) and the Space Transportation System Shuttle Orbiter, to conduct remote, teleoperated recovery of disabled and noncontrollable, tumbling satellites. Previous studies did not quantify the dynamic characteristics of a tumbling satellite, nor did they appear to address the full spectrum of Tumbling Satellite Recovery systems requirements. Both of these aspects are investigated with useful results.

  20. Study to define an approach for developing a computer-based system capable of automatic, unattended assembly/disassembly of spacecraft, phase 1

    NASA Technical Reports Server (NTRS)

    Nevins, J. L.; Defazio, T. L.; Seltzer, D. S.; Whitney, D. E.

    1981-01-01

    The initial set of requirements for additional studies necessary to implement a space-borne, computer-based work system capable of achieving assembly, disassembly, repair, or maintenance in space were developed. The specific functions required of a work system to perform repair and maintenance were discussed. Tasks and relevant technologies were identified and delineated. The interaction of spacecraft design and technology options, including a consideration of the strategic issues of repair versus retrieval-replacement or destruction by removal were considered along with the design tradeoffs for accomplishing each of the options. A concept system design and its accompanying experiment or test plan were discussed.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Touati, Said; Chennai, Salim; Souli, Aissa

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how wellmore » a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)« less

  2. Comparative analysis of data base management systems

    NASA Technical Reports Server (NTRS)

    Smith, R.

    1983-01-01

    A study to determine if the Remote File Inquiry (RFI) system would handle the future requirements of the user community is discussed. RFI is a locally written and locally maintained on-line query/update package. The current and future on-line requirements of the user community were studied. Additional consideration was given to the types of data structuring the users required. The survey indicated the features of greatest benefit were: sort, subtotals, totals, record selection, storage of queries, global updating and the ability to page break. The major deficiencies were: one level of hierarchy, excessive response time, software unreliability, difficult to add, delete and modify records, complicated error messages and the lack of ability to perform interfield comparisons. Missing features users required were: formatted screens, interfield comparions, interfield arithmetic, multiple file access, security and data integrity. The survey team recommended Kennedy Space Center move forward to state-of-the-art software, a Data Base Management System which is thoroughly tested and easy to implement and use.

  3. A Case Study of Non-Functional Requirements and Continuous Improvement at a National Communications System Contractor

    ERIC Educational Resources Information Center

    Douglas, Volney L. R.

    2010-01-01

    National communications systems (NCS) are critical elements of a government's infrastructure. Limited improvements to the non-functional requirements (NFR) of NCS have caused issues during national emergencies such as 9/11 and Hurricane Katrina. The literature indicates that these issues result from a deficiency in understanding the roles NFRs and…

  4. Occupational Skill Standards. Experience Shows Industry Involvement To Be Key. Testimony before the Committee on Labor and Human Resources, U.S. Senate.

    ERIC Educational Resources Information Center

    Morra, Linda G.

    A study reviewed eight standards and certification systems for occupations that required less than a bachelor's degree for entry-level employment. Common elements among systems included industry ownership and control, recertification requirements to keep certificate holders' skills current, national portability of credentials, and integration of…

  5. American Association of University Women: Branch Operations Data Modeling Case

    ERIC Educational Resources Information Center

    Harris, Ranida B.; Wedel, Thomas L.

    2015-01-01

    A nationally prominent woman's advocacy organization is featured in this case study. The scenario may be used as a teaching case, an assignment, or a project in systems analysis and design as well as database design classes. Students are required to document the system operations and requirements, apply logical data modeling concepts, and design…

  6. Design and implementation of a secure workflow system based on PKI/PMI

    NASA Astrophysics Data System (ADS)

    Yan, Kai; Jiang, Chao-hui

    2013-03-01

    As the traditional workflow system in privilege management has the following weaknesses: low privilege management efficiency, overburdened for administrator, lack of trust authority etc. A secure workflow model based on PKI/PMI is proposed after studying security requirements of the workflow systems in-depth. This model can achieve static and dynamic authorization after verifying user's ID through PKC and validating user's privilege information by using AC in workflow system. Practice shows that this system can meet the security requirements of WfMS. Moreover, it can not only improve system security, but also ensures integrity, confidentiality, availability and non-repudiation of the data in the system.

  7. Significance of User Participation in a Hospital Information System Success: Insights From a Case Study.

    PubMed

    Saleem, Naveed; Steel, Douglas; Gercek, Gokhan; Chandra, Ashish

    User participation in the development of a system is universally prescribed as an effective strategy to ensure the success of the resultant system. However, the existing literature on the merits of user participation only provides equivocal evidence. Various analyses of this literature point out that this equivocal evidence may be due to inconsistent operational measures of the user participation and system success constructs. Planned organizational change and participative decision making, the underlying paradigms of user participation construct, suggest that the development of some information systems may require blending of users' system-related functional expertise and developers' technical expertise to ensure system success. These paradigms also maintain that in case of well-defined, structured information systems user participation should enhance the likelihood of system success through better user understanding of the need for the system and system content and objectives, user trust, and a sense of system ownership. This research also described a case study involving the development and implementation of a medical records system for a neonatal intensive care unit in a large hospital in Texas. The case study provides evidence that in systems that require incorporation of user functional expertise user participation will enhance the likelihood of system success.

  8. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BEVINS, R.R.

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operationsmore » input or engineering judgment.« less

  9. Information management system study results. Volume 2: IMS study results appendixes

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Computer systems program specifications are presented for the modular space station information management system. These are the computer program contract end item, data bus system, data bus breadboard, and display interface adapter specifications. The performance, design, tests, and qualification requirements are established for the implementation of the information management system. For Vol. 1, see N72-19972.

  10. New York State Canal System : modern freight-way.

    DOT National Transportation Integrated Search

    2010-05-01

    This study demonstrates the benefits of waterborne freight logistics and makes the case for instituting container-onbarge : service on the New York State Canal System. : We summarize numerous studies comparing the energy requirements and environmenta...

  11. Space Tug avionics definition study. Volume 2: Avionics functional requirements

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Flight and ground operational phases of the tug/shuttle system are analyzed to determine the general avionics support functions that are needed during each of the mission phases and sub-phases. Each of these general support functions is then expanded into specific avionics system requirements, which are then allocated to the appropriate avionics subsystems. This process is then repeated at the next lower level of detail where these subsystem requirements are allocated to each of the major components that comprise a subsystem.

  12. Multi-level Expression Design Language: Requirement level (MEDL-R) system evaluation

    NASA Technical Reports Server (NTRS)

    1980-01-01

    An evaluation of the Multi-Level Expression Design Language Requirements Level (MEDL-R) system was conducted to determine whether it would be of use in the Goddard Space Flight Center Code 580 software development environment. The evaluation is based upon a study of the MEDL-R concept of requirement languages, the functions performed by MEDL-R, and the MEDL-R language syntax. Recommendations are made for changes to MEDL-R that would make it useful in the Code 580 environment.

  13. Windvan laser study

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The goal of defining a CO2 laser transmitter approach suited to Shuttle Coherent Atmospheric Lidar Experiment (SCALE) requirements is discussed. The adaptation of the existing WINDVAN system to the shuttle environment is addressed. The size, weight, reliability, and efficiency of the existing WINDVAN system are largely compatible with SCALE requirements. Repacking is needed for compatibility with vacuum and thermal environments. Changes are required to ensure survival through launch and landing, mechanical, vibration, and acoustic loads. Existing WINDVAN thermal management approaches depending on convection need to be upgraded zero gravity operations.

  14. Advanced information processing system: The Army fault tolerant architecture conceptual study. Volume 1: Army fault tolerant architecture overview

    NASA Technical Reports Server (NTRS)

    Harper, R. E.; Alger, L. S.; Babikyan, C. A.; Butler, B. P.; Friend, S. A.; Ganska, R. J.; Lala, J. H.; Masotto, T. K.; Meyer, A. J.; Morton, D. P.

    1992-01-01

    Digital computing systems needed for Army programs such as the Computer-Aided Low Altitude Helicopter Flight Program and the Armored Systems Modernization (ASM) vehicles may be characterized by high computational throughput and input/output bandwidth, hard real-time response, high reliability and availability, and maintainability, testability, and producibility requirements. In addition, such a system should be affordable to produce, procure, maintain, and upgrade. To address these needs, the Army Fault Tolerant Architecture (AFTA) is being designed and constructed under a three-year program comprised of a conceptual study, detailed design and fabrication, and demonstration and validation phases. Described here are the results of the conceptual study phase of the AFTA development. Given here is an introduction to the AFTA program, its objectives, and key elements of its technical approach. A format is designed for representing mission requirements in a manner suitable for first order AFTA sizing and analysis, followed by a discussion of the current state of mission requirements acquisition for the targeted Army missions. An overview is given of AFTA's architectural theory of operation.

  15. Coupled Cryogenic Thermal and Electrical Models for Transient Analysis of Superconducting Power Devices with Integrated Cryogenic Systems

    NASA Astrophysics Data System (ADS)

    Satyanarayana, S.; Indrakanti, S.; Kim, J.; Kim, C.; Pamidi, S.

    2017-12-01

    Benefits of an integrated high temperature superconducting (HTS) power system and the associated cryogenic systems on board an electric ship or aircraft are discussed. A versatile modelling methodology developed to assess the cryogenic thermal behavior of the integrated system with multiple HTS devices and the various potential configurations are introduced. The utility and effectiveness of the developed modelling methodology is demonstrated using a case study involving a hypothetical system including an HTS propulsion motor, an HTS generator and an HTS power cable cooled by an integrated cryogenic helium circulation system. Using the methodology, multiple configurations are studied. The required total cooling power and the ability to maintain each HTS device at the required operating temperatures are considered for each configuration and the trade-offs are discussed for each configuration. Transient analysis of temperature evolution in the cryogenic helium circulation loop in case of a system failure is carried out to arrive at the required critical response time. The analysis was also performed for a similar liquid nitrogen circulation for an isobaric condition and the cooling capacity ratio is used to compare the relative merits of the two cryogens.

  16. Extravehicular mobility unit subcritical liquid oxygen storage and supply system

    NASA Technical Reports Server (NTRS)

    Anderson, John; Martin, Timothy; Hodgson, ED

    1992-01-01

    The storage of life support oxygen in the Extravehicular Mobility Unit in the liquid state offers some advantages over the current method of storing the oxygen as a high pressure gas. Storage volume is reduced because of the increased density associated with liquid. The lower storage and operating pressures also reduce the potential for leakage or bursting of the storage tank. The potential for combustion resulting from adiabatic combustion of the gas within lines and components is substantially reduced. Design constraints on components are also relaxed due to the lower system pressures. A design study was performed to determine the requirements for a liquid storage system and prepare a conceptual design. The study involved four tasks. The first was to identify system operating requirements that influence or direct the design of the system. The second was to define candidate storage system concepts that could possibly satisfy the requirements. An evaluation and comparison of the candidate concepts was conducted in the third task. The fourth task was devoted to preparing a conceptual design of the recommended storage system and to evaluate concerns with integration of the concept into the EMU. The results are presented.

  17. Study of power management technology for orbital multi-100KWe applications. Volume 3: Requirements

    NASA Technical Reports Server (NTRS)

    Mildice, J. W.

    1980-01-01

    Mid to late 1980's power management technology needs to support development of a general purpose space platform, capable of suplying 100 to 250 KWe to a variety of users in low Earth orbit are examined. A typical, shuttle assembled and supplied space platform is illustred, along with a group of payloads which might reasonably be expected to use such a facility. Examination of platform and user power needs yields a set of power requirements used to evaluate power management options for life cycle cost effectivness. The most cost effective ac/dc and dc systems are evaluated, specifically to develop system details which lead to technology goals, including: array and transmission voltages, best frequency for ac power transmission, and advantages and disadvantages of ac and dc systems for this application. System and component requirements are compared with the state-of-the-art to identify areas where technological development is required.

  18. Exoskeleton for Soldier Enhancement Systems Feasibility Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jansen, J.F.

    2000-09-28

    The development of a successful exoskeleton for human performance augmentation (EHPA) will require a multi-disciplinary systems approach based upon sound biomechanics, power generation and actuation systems, controls technology, and operator interfaces. The ability to integrate key components into a system that enhances performance without impeding operator mobility is essential. The purpose of this study and report are to address the issue of feasibility of building a fieldable EHPA. Previous efforts, while demonstrating progress and enhancing knowledge, have not approached the level required for a fully functional, fieldable system. It is doubtless that the technologies required for a successful exoskeleton havemore » advanced, and some of them significantly. The question to be addressed in this report is have they advanced to the point of making a system feasible in the next three to five years? In this study, the key technologies required to successfully build an exoskeleton have been examined. The primary focus has been on the key technologies of power sources, actuators, and controls. Power sources, including internal combustion engines, fuel cells, batteries, super capacitors, and hybrid sources have been investigated and compared with respect to the exoskeleton application. Both conventional and non-conventional actuator technologies that could impact EHPA have been assessed. In addition to the current state of the art of actuators, the potential for near-term improvements using non-conventional actuators has also been addressed. Controls strategies, and their implication to the design approach, and the exoskeleton to soldier interface have also been investigated. In addition to these key subsystems and technologies, this report addresses technical concepts and issues relating to an integrated design. A recommended approach, based on the results of the study is also presented.« less

  19. Conical scan impact study. Volume 2: Small local user data processing facility. [multispectral band scanner design alternatives for earth resources data

    NASA Technical Reports Server (NTRS)

    Ebert, D. H.; Chase, P. E.; Dye, J.; Fahline, W. C.; Johnson, R. H.

    1973-01-01

    The impact of a conical scan versus a linear scan multispectral scanner (MSS) instrument on a small local-user data processing facility was studied. User data requirements were examined to determine the unique system rquirements for a low cost ground system (LCGS) compatible with the Earth Observatory Satellite (EOS) system. Candidate concepts were defined for the LCGS and preliminary designs were developed for selected concepts. The impact of a conical scan MSS versus a linear scan MSS was evaluated for the selected concepts. It was concluded that there are valid user requirements for the LCGS and, as a result of these requirements, the impact of the conical scanner is minimal, although some new hardware development for the LCGS is necessary to handle conical scan data.

  20. Preliminary design study of the TMT Telescope structure system: overview

    NASA Astrophysics Data System (ADS)

    Usuda, Tomonori; Ezaki, Yutaka; Kawaguchi, Noboru; Nagae, Kazuhiro; Kato, Atsushi; Takaki, Junji; Hirano, Masaki; Hattori, Tomoya; Tabata, Masaki; Horiuchi, Yasushi; Saruta, Yusuke; Sofuku, Satoru; Itoh, Noboru; Oshima, Takeharu; Takanezawa, Takashi; Endo, Makoto; Inatani, Junji; Iye, Masanori; Sadjadpour, Amir; Sirota, Mark; Roberts, Scott; Stepp, Larry

    2014-07-01

    We present an overview of the preliminary design of the Telescope Structure System (STR) of Thirty Meter Telescope (TMT). NAOJ was given responsibility for the TMT STR in early 2012 and engaged Mitsubishi Electric Corporation (MELCO) to take over the preliminary design work. MELCO performed a comprehensive preliminary design study in 2012 and 2013 and the design successfully passed its Preliminary Design Review (PDR) in November 2013 and April 2014. Design optimizations were pursued to better meet the design requirements and improvements were made in the designs of many of the telescope subsystems as follows: 1. 6-legged Top End configuration to support secondary mirror (M2) in order to reduce deformation of the Top End and to keep the same 4% blockage of the full aperture as the previous STR design. 2. "Double Lower Tube" of the elevation (EL) structure to reduce the required stroke of the primary mirror (M1) actuators to compensate the primary mirror cell (M1 Cell) deformation caused during the EL angle change in accordance with the requirements. 3. M1 Segment Handling System (SHS) to be able to make removing and installing 10 Mirror Segment Assemblies per day safely and with ease over M1 area where access of personnel is extremely difficult. This requires semi-automatic sequence operation and a robotic Segment Lifting Fixture (SLF) designed based on the Compliance Control System, developed for controlling industrial robots, with a mechanism to enable precise control within the six degrees of freedom of position control. 4. CO2 snow cleaning system to clean M1 every few weeks that is similar to the mechanical system that has been used at Subaru Telescope. 5. Seismic isolation and restraint systems with respect to safety; the maximum acceleration allowed for M1, M2, tertiary mirror (M3), LGSF, and science instruments in 1,000 year return period earthquakes are defined in the requirements. The Seismic requirements apply to any EL angle, regardless of the operational status of Hydro Static Bearing (HSB) system and stow lock pins. In order to find a practical solution, design optimization study for seismic risk mitigation was carried out extensively, including the performing of dynamic response analyses of the STR system under the time dependent acceleration profile of seven major earthquakes. The work is now moving to the final design phase from April 2014 for two years.

  1. Balancing Authority Cooperation Concepts to Reduce Variable Generation Integration Costs in the Western Interconnection: Consolidating Balancing Authorities and Sharing Balancing Reserves

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samaan, Nader A.; Makarov, Yuri V.; Nguyen, Tony B.

    2017-05-07

    The study described in this chapter demonstrates the benefits of BA consolidation with the help of a detailed WECC system model and advanced methodology, which is also described in this chapter. The study aims to determine the potential savings in production cost and reduction in balancing reserve requirements in the WECC system. The study has found that effective use of the diversity in load and variable generation over a wide area can indeed help to achieve significant savings. The implementation cost for the consolidation was beyond the scope of this study. The analysis was performed for two different scenarios ofmore » VG penetration: 11% (8% wind and 3% solar) and 33% (24% wind and 9% solar) of WECC projected energy demand in 2020. In analysis of balancing reserves, the objective was to determine the reduction in balancing reserve requirements due to BA consolidation, in terms of required capacity and ramp-rates. Hour-ahead and 10-minute ahead forecast errors for load, wind, and solar were simulated. In addition, 1-minute resolution load, wind and solar data were used to derive balancing reserve requirements i.e. load-following and regulation requirements for each individual BA and for the consolidated BA (CBA). The reduction in balancing reserves was determined by calculating the difference between total reserve requirements that need to be carried by different BAs if they operate individually, and reserve requirements that need to be carried by the CBA. The study results show that the consolidated WECC system would have about a 50% overall reduction in balancing reserves for the 11% penetration scenario and a 65% reduction for the 33% penetration scenario in comparison with total reserve requirements that need to be carried by different BAs if they operate individually.« less

  2. Responses to Information Systems Graduate Preparation and Job Needs: Implications for Higher Education

    ERIC Educational Resources Information Center

    Simon, DeShea; Jackson, Kanata

    2015-01-01

    This study examined the perspectives on academic preparation and job skill needs of Information Systems program graduates from an Eastern state in the US. A historical review of the literature surrounding information systems skill requirements was conducted for this study, to provide an understanding of the changes in information systems over the…

  3. Where We Stand: Comparative Study of Japanese and Kentucky Educational Requirements.

    ERIC Educational Resources Information Center

    Yoo, Yushin

    The educational systems and requirements of Japan and Kentucky are compared in seven different areas. The first area compares total instruction days and illustrates the differences with a chart. Kentucky requires 175 days of instruction while Japan requires 240 days. Because of this Japanese students spend 150 to 300 more hours per year in school…

  4. Study of solar array switching power management technology for space power system

    NASA Technical Reports Server (NTRS)

    Cassinelli, J. E.

    1982-01-01

    This report documents work performed on the Solar Array Switching Power Management Study. Mission characteristics for three missions were defined to the depth necessary to determine their power management requirements. Solar array switching concepts were identified that could safisfy the mission requirements. These switching concepts were compared with a conventional buck regulator system on the basis of cost, weight and volume, reliability, efficiency and thermal control. For the missions reviewed, solar array switching provided significant advantages in all areas of comparison.

  5. Study of solar array switching power management technology for space power system

    NASA Technical Reports Server (NTRS)

    Cassinelli, J. E.

    1982-01-01

    This report documents work performed on the Solar Array Switching Power Management Study. Mission characteristics for three missions were defined to the depth necessary to determine their power management requirements. Solar array switching concepts which could satisfy the mission requirements were identified. The switching concepts were compared with a conventional buck regulator system for cost, weight and volume, reliability, efficiency and thermal control. Solar array switching provided significant advantages in all areas of comparison for the reviewed missions.

  6. Spacelab system analysis: A study of the Marshall Avionics System Testbed (MAST)

    NASA Astrophysics Data System (ADS)

    Ingels, Frank M.; Owens, John K.; Daniel, Steven P.; Ahmad, F.; Couvillion, W.

    1988-09-01

    An analysis of the Marshall Avionics Systems Testbed (MAST) communications requirements is presented. The average offered load for typical nodes is estimated. Suitable local area networks are determined.

  7. Spacelab system analysis: A study of the Marshall Avionics System Testbed (MAST)

    NASA Technical Reports Server (NTRS)

    Ingels, Frank M.; Owens, John K.; Daniel, Steven P.; Ahmad, F.; Couvillion, W.

    1988-01-01

    An analysis of the Marshall Avionics Systems Testbed (MAST) communications requirements is presented. The average offered load for typical nodes is estimated. Suitable local area networks are determined.

  8. Earth orbital experiment program and requirements study, volume 1, sections 1 - 6

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A reference manual for planners of manned earth-orbital research activity is presented. The manual serves as a systems approach to experiment and mission planning based on an integrated consideration of candidate research programs and the appropriate vehicle, mission, and technology development requirements. Long range goals and objectives for NASA activities during the 1970 to 1980 time period are analyzed. The useful and proper roles of manned and automated spacecraft for implementing NASA experiments are described. An integrated consideration of NASA long range goals and objectives, the system and mission requirements, and the alternative implementation plans are developed. Specific areas of investigation are: (1) manned space flight requirements, (2) space biology, (3) spaceborne astronomy, (4) space communications and navigation, (5) earth observation, (6) supporting technology development requirements, (7) data management system matrices, (8) instrumentation matrices, and (9) biotechnology laboratory experiments.

  9. Space shuttle environmental control/life support systems

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This study analyzes and defines a baseline Environmental Control/Life Support System (EC/LSS) for a four-man, seven-day orbital shuttle. In addition, the impact of various mission parameters, crew size, mission length, etc. are examined for their influence on the selected system. Pacing technology items are identified to serve as a guide for application of effort to enhance the total system optimization. A fail safe-fail operation philosophy was utilized in designing the system. This has resulted in a system that requires only one daily routine operation. All other critical item malfunctions are automatically resolved by switching to redundant modes of operation. As a result of this study, it is evident that a practical, flexible, simple and long life, EC/LSS can be designed and manufactured for the shuttle orbiter within the time phase required.

  10. Advanced extravehicular protective systems for shuttle, space station, lunar base and Mars missions.

    NASA Technical Reports Server (NTRS)

    Heimlich, P. F.; Sutton, J. G.; Tepper, E. H.

    1972-01-01

    Advances in extravehicular life support system technology will directly influence future space mission reliability and maintainability considerations. To identify required new technology areas, an appraisal of advanced portable life support system and subsystem concepts was conducted. Emphasis was placed on thermal control and combined CO2 control/O2 supply subsystems for both primary and emergency systems. A description of study methodology, concept evaluation techniques, specification requirements, and selected subsystems and systems are presented. New technology recommendations encompassing thermal control, CO2 control and O2 supply subsystems are also contained herein.

  11. Open-source point-of-care electronic medical records for use in resource-limited settings: systematic review and questionnaire surveys

    PubMed Central

    Bru, Juan; Berger, Christopher A

    2012-01-01

    Background Point-of-care electronic medical records (EMRs) are a key tool to manage chronic illness. Several EMRs have been developed for use in treating HIV and tuberculosis, but their applicability to primary care, technical requirements and clinical functionalities are largely unknown. Objectives This study aimed to address the needs of clinicians from resource-limited settings without reliable internet access who are considering adopting an open-source EMR. Study eligibility criteria Open-source point-of-care EMRs suitable for use in areas without reliable internet access. Study appraisal and synthesis methods The authors conducted a comprehensive search of all open-source EMRs suitable for sites without reliable internet access. The authors surveyed clinician users and technical implementers from a single site and technical developers of each software product. The authors evaluated availability, cost and technical requirements. Results The hardware and software for all six systems is easily available, but they vary considerably in proprietary components, installation requirements and customisability. Limitations This study relied solely on self-report from informants who developed and who actively use the included products. Conclusions and implications of key findings Clinical functionalities vary greatly among the systems, and none of the systems yet meet minimum requirements for effective implementation in a primary care resource-limited setting. The safe prescribing of medications is a particular concern with current tools. The dearth of fully functional EMR systems indicates a need for a greater emphasis by global funding agencies to move beyond disease-specific EMR systems and develop a universal open-source health informatics platform. PMID:22763661

  12. A Path to Planetary Protection Requirements for Human Exploration: A Literature Review and Systems Engineering Approach

    NASA Technical Reports Server (NTRS)

    Johnson, James E.; Conley, Cassie; Siegel, Bette

    2015-01-01

    As systems, technologies, and plans for the human exploration of Mars and other destinations beyond low Earth orbit begin to coalesce, it is imperative that frequent and early consideration is given to how planetary protection practices and policy will be upheld. While the development of formal planetary protection requirements for future human space systems and operations may still be a few years from fruition, guidance to appropriately influence mission and system design will be needed soon to avoid costly design and operational changes. The path to constructing such requirements is a journey that espouses key systems engineering practices of understanding shared goals, objectives and concerns, identifying key stakeholders, and iterating a draft requirement set to gain community consensus. This paper traces through each of these practices, beginning with a literature review of nearly three decades of publications addressing planetary protection concerns with respect to human exploration. Key goals, objectives and concerns, particularly with respect to notional requirements, required studies and research, and technology development needs have been compiled and categorized to provide a current 'state of knowledge'. This information, combined with the identification of key stakeholders in upholding planetary protection concerns for human missions, has yielded a draft requirement set that might feed future iteration among space system designers, exploration scientists, and the mission operations community. Combining the information collected with a proposed forward path will hopefully yield a mutually agreeable set of timely, verifiable, and practical requirements for human space exploration that will uphold international commitment to planetary protection.

  13. Satellite power systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis, appendixes

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.

  14. Space shuttle propulsion systems on-board checkout and monitoring system development study (extension). Volume 1: Summary and technical results

    NASA Technical Reports Server (NTRS)

    1972-01-01

    An analysis was conducted of the space shuttle propulsion systems to define the onboard checkout and monitoring function. A baseline space shuttle vehicle and mission were used to establish the techniques and approach for defining the requirements. The requirements were analyzed to formulate criteria for implementing the functions of preflight checkout, performance monitoring, fault isolation, emergency detection, display, data storage, postflight evaluation, and maintenance retest.

  15. Reliable Thermoelectric Module Design under Opposing Requirements from Structural and Thermoelectric Considerations

    NASA Astrophysics Data System (ADS)

    Karri, Naveen K.; Mo, Changki

    2018-06-01

    Structural reliability of thermoelectric generation (TEG) systems still remains an issue, especially for applications such as large-scale industrial or automobile exhaust heat recovery, in which TEG systems are subject to dynamic loads and thermal cycling. Traditional thermoelectric (TE) system design and optimization techniques, focused on performance alone, could result in designs that may fail during operation as the geometric requirements for optimal performance (especially the power) are often in conflict with the requirements for mechanical reliability. This study focused on reducing the thermomechanical stresses in a TEG system without compromising the optimized system performance. Finite element simulations were carried out to study the effect of TE element (leg) geometry such as leg length and cross-sectional shape under constrained material volume requirements. Results indicated that the element length has a major influence on the element stresses whereas regular cross-sectional shapes have minor influence. The impact of TE element stresses on the mechanical reliability is evaluated using brittle material failure theory based on Weibull analysis. An alternate couple configuration that relies on the industry practice of redundant element design is investigated. Results showed that the alternate configuration considerably reduced the TE element and metallization stresses, thereby enhancing the structural reliability, with little trade-off in the optimized performance. The proposed alternate configuration could serve as a potential design modification for improving the reliability of systems optimized for thermoelectric performance.

  16. Assessment of lightweight mobile nuclear power systems. [for airborne vehicles

    NASA Technical Reports Server (NTRS)

    Anderson, J. L.; Rom, F. E.

    1973-01-01

    A review was made of lightweight mobile nuclear power systems (LMNPS). Data cover technical feasibility studies of LMNPS and airborne vehicles, mission studies, and non-technical conditions that are required to develop and use LMNPS.

  17. New York State canal system : modern freight-way

    DOT National Transportation Integrated Search

    2010-05-01

    This study demonstrates the benefits of waterborne freight logistics and makes the case for instituting container-onbarge service on the New York State Canal System. We summarize numerous studies comparing the energy requirements and environmental ex...

  18. National ITS/CVO program

    DOT National Transportation Integrated Search

    1997-02-01

    This report was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national program to apply In...

  19. DESIGN INFORMATION ON FINE PORE AERATION SYSTEMS

    EPA Science Inventory

    Field studies were conducted over several years at municipal wastewater treatment plants employing line pore diffused aeration systems. These studies were designed to produce reliable information on the performance and operational requirements of fine pore devices under process ...

  20. Megawatt solar power systems for lunar surface operations

    NASA Technical Reports Server (NTRS)

    Adams, Brian; Alhadeff, Sam; Beard, Shawn; Carlile, David; Cook, David; Douglas, Craig; Garcia, Don; Gillespie, David; Golingo, Raymond; Gonzalez, Drew

    1990-01-01

    Lunar surface operations require habitation, transportation, life support, scientific, and manufacturing systems, all of which require some form of power. As an alternative to nuclear power, the development of a modular one megawatt solar power system is studied, examining both photovoltaic and dynamic cycle conversion methods, along with energy storage, heat rejection, and power backup subsystems. For photovoltaic power conversion, two systems are examined. First, a substantial increase in photovoltaic conversion efficiency is realized with the use of new GaAs/GaSb tandem photovoltaic cells, offering an impressive overall array efficiency of 23.5 percent. Since these new cells are still in the experimental phase of development, a currently available GaAs cell providing 18 percent efficiency is examined as an alternate to the experimental cells. Both Brayton and Stirling cycles, powered by linear parabolic solar concentrators, are examined for dynamic cycle power conversion. The Brayton cycle is studied in depth since it is already well developed and can provide high power levels fairly efficiently in a compact, low mass system. The dynamic conversion system requires large scale waste heat rejection capability. To provide this heat rejection, a comparison is made between a heat pipe/radiative fin system using advanced composites, and a potentially less massive liquid droplet radiator system. To supply power through the lunar night, both a low temperature alkaline fuel cell system and an experimental high temperature monolithic solid-oxide fuel cell system are considered. The reactants for the fuel cells are stored cryogenically in order to avoid the high tankage mass required by conventional gaseous storage. In addition, it is proposed that the propellant tanks from a spent, prototype lunar excursion vehicle be used for this purpose, therefore resulting in a significant overall reduction in effective storage system mass.

  1. Energy Conversion Alternatives Study (ECAS)

    NASA Technical Reports Server (NTRS)

    1977-01-01

    ECAS compared various advanced energy conversion systems that can use coal or coal-derived fuels for baseload electric power generation. It was conducted in two phases. Phase 1 consisted of parametric studies. From these results, 11 concepts were selected for further study in Phase 2. For each of the Phase 2 systems and a common set of ground rules, performance, cost, environmental intrusion, and natural resource requirements were estimated. In addition, the contractors defined the state of the associated technology, identified the advances required, prepared preliminary research and development plans, and assessed other factors that would affect the implementation of each type of powerplant. The systems studied in Phase 2 include steam systems with atmospheric- and pressurized-fluidized-bed boilers; combined cycle gas turbine/steam systems with integrated gasifiers or fired by a semiclean, coal derived fuel; a potassium/steam system with a pressurized-fluidized-bed boiler; a closed-cycle gas turbine/organic system with a high-temperature, atmospheric-fluidized-bed furnace; a direct-coal-fired, open- cycle magnetohydrodynamic/steam system; and a molten-carbonate fuel cell/steam system with an integrated gasifier. The sensitivity of the results to changes in the ground rules and the impact of uncertainties in capital cost estimates were also examined.

  2. Multidisciplinary approach to successful implementation of production information system (PRISM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shariff, M.R.; Gopalakrishnan, S.G.; Francis, N.

    1995-12-31

    A company wide corporate and regional production database supporting all production areas was envisaged critical to the current expansion within Petronas Carigali Sdn Bhd (PCSB). A multi disciplinary project team was thus formed to analyze the requirements prior to developing, testing, implementing and training users. PCSB has currently evolved into a mature E & P company on par with other E & P companies within the region. This expansion necessitates a common Production Information System for the efficient dissemination of vital Production Information for Production Surveillance, Reservoir Management, Reserve Assessment, Special Studies and Standardized Group-wide Reporting. This paper will discussmore » all the phases involved in the project which includes Systems Requirement Study, Data Migration, System Development, System Implementation and Post-Implementation Plan.« less

  3. Study on a PEFC propulsion system for surface ships

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ono, Ryuta; Tsuchiyama, Syozo

    1996-12-31

    This Abstract summarizes a series of presentations to the present Seminar, covering various aspects of a 1,000 kW PEFC system envisaged as propulsion system to equip a 1,500 DWT Cargo vessel, reported under the following titles: (1) Performance Evaluation of 1kW PEFC (2) Performance of Catalysts for CO Removal by Methanation Reaction (3) Development of a Selective Oxidation CO Removal Reactor for Methanol Reformate Gas (4) Experimental Investigation on a Turbine Compressor for Air Supply System of a Fuel Cell (5) Dynamic Simulator for PEFC Propulsion Plant (6) Power Feature Required for PEFC Powered Electric Propulsion Ship The purpose ofmore » this study is to identify subjects requiring further development toward the realization of a practical fuel cell system to power ships.« less

  4. Manned space flight nuclear system safety. Volume 5: Nuclear System safety guidelines. Part 1: Space base nuclear safety

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The design and operations guidelines and requirements developed in the study of space base nuclear system safety are presented. Guidelines and requirements are presented for the space base subsystems, nuclear hardware (reactor, isotope sources, dynamic generator equipment), experiments, interfacing vehicles, ground support systems, range safety and facilities. Cross indices and references are provided which relate guidelines to each other, and to substantiating data in other volumes. The guidelines are intended for the implementation of nuclear safety related design and operational considerations in future space programs.

  5. Earth resources data acquisition sensor study

    NASA Technical Reports Server (NTRS)

    Grohse, E. W.

    1975-01-01

    The minimum data collection and data processing requirements are investigated for the development of water monitoring systems, which disregard redundant and irrelevant data and process only those data predictive of the onset of significant pollution events. Two approaches are immediately suggested: (1) adaptation of a presently available ambient air monitoring system developed by TVA, and (2) consideration of an air, water, and radiological monitoring system developed by the Georgia Tech Experiment Station. In order to apply monitoring systems, threshold values and maximum allowable rates of change of critical parameters such as dissolved oxygen and temperature are required.

  6. Manned space flight nuclear system safety. Voluem 5: Nuclear system safety guidelines. Part 2: Space shuttle/nuclear payloads safety

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The design and operations guidelines and requirements developed in the study of space shuttle nuclear system transportation are presented. Guidelines and requirements are presented for the shuttle, nuclear payloads (reactor, isotope-Brayton and small isotope sources), ground support systems and facilities. Cross indices and references are provided which relate guidelines to each other, and to substantiating data in other volumes. The guidelines are intended for the implementation of nuclear safety related design and operational considerations in future space programs.

  7. PIP-II Cryogenic System and the Evolution of Superfluid Helium Cryogenic Plant Specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chakravarty, Anindya; Rane, Tejas; Klebaner, Arkadiy

    2017-01-01

    PIP-II cryogenic system: Superfluid Helium Cryogenic Plant (SHCP) and Cryogenic Distribution System (CDS) connecting the SHCP and the SC Linac (25 cryomodules) PIP-II Cryogenic System Static and dynamic heat loads for the SC Linac and static load of CDS listed out Simulation study carried out to compute SHe flow requirements for each cryomodule Comparison between the flow requirements of the cryomodules for the CW and pulsed modes of operation presented From computed heat load and pressure drop values, SHCP basic specifications evolved.

  8. Solution of nonlinear multivariable constrained systems using a gradient projection digital algorithm that is insensitive to the initial state

    NASA Technical Reports Server (NTRS)

    Hargrove, A.

    1982-01-01

    Optimal digital control of nonlinear multivariable constrained systems was studied. The optimal controller in the form of an algorithm was improved and refined by reducing running time and storage requirements. A particularly difficult system of nine nonlinear state variable equations was chosen as a test problem for analyzing and improving the controller. Lengthy analysis, modeling, computing and optimization were accomplished. A remote interactive teletype terminal was installed. Analysis requiring computer usage of short duration was accomplished using Tuskegee's VAX 11/750 system.

  9. 46 CFR 310.65 - Graduation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following requirements: (i) Completion of the required course of study; (ii) Fulfillment of the requirements... midshipman disciplinary and honor systems. (2) Graduates receive the degree of Bachelor of Science and a U.S... Navy. (3) In return for the education received at Government expense, each applicant shall sign an...

  10. 46 CFR 310.65 - Graduation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... following requirements: (i) Completion of the required course of study; (ii) Fulfillment of the requirements... midshipman disciplinary and honor systems. (2) Graduates receive the degree of Bachelor of Science and a U.S... Navy. (3) In return for the education received at Government expense, each applicant shall sign an...

  11. Life sciences payload definition and integration study. Volume 2: Requirements, design, and planning studies for the carry-on laboratories. [for Spacelab

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The task phase concerned with the requirements, design, and planning studies for the carry-on laboratory (COL) began with a definition of biomedical research areas and candidate research equipment, and then went on to develop conceptual layouts for COL which were each evaluated in order to arrive at a final conceptual design. Each step in this design/evaluation process concerned itself with man/systems integration research and hardware, and life support and protective systems research and equipment selection. COL integration studies were also conducted and include attention to electrical power and data management requirements, operational considerations, and shuttle/Spacelab interface specifications. A COL program schedule was compiled, and a cost analysis was finalized which takes into account work breakdown, annual funding, and cost reduction guidelines.

  12. Digitally controlled twelve-pulse firing generator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berde, D.; Ferrara, A.A.

    1981-01-01

    Control System Studies for the Tokamak Fusion Test Reactor (TFTR) indicate that accurate thyristor firing in the AC-to-DC conversion system is required in order to achieve good regulation of the various field currents. Rapid update and exact firing angle control are required to avoid instabilities, large eddy currents, or parasitic oscillations. The Prototype Firing Generator was designed to satisfy these requirements. To achieve the required /plus or minus/0.77/degree/firing accuracy, a three-phase-locked loop reference was designed; otherwise, the Firing Generator employs digital circuitry. The unit, housed in a standard CAMAC crate, operates under microcomputer control. Functions are performed under program control,more » which resides in nonvolatile read-only memory. Communication with CICADA control system is provided via an 11-bit parallel interface.« less

  13. MODELING AND PERFORMANCE EVALUATION FOR AVIATION SECURITY CARGO INSPECTION QUEUING SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allgood, Glenn O; Olama, Mohammed M; Rose, Terri A

    Beginning in 2010, the U.S. will require that all cargo loaded in passenger aircraft be inspected. This will require more efficient processing of cargo and will have a significant impact on the inspection protocols and business practices of government agencies and the airlines. In this paper, we conduct performance evaluation study for an aviation security cargo inspection queuing system for material flow and accountability. The overall performance of the aviation security cargo inspection system is computed, analyzed, and optimized for the different system dynamics. Various performance measures are considered such as system capacity, residual capacity, and throughput. These metrics aremore » performance indicators of the system s ability to service current needs and response capacity to additional requests. The increased physical understanding resulting from execution of the queuing model utilizing these vetted performance measures will reduce the overall cost and shipping delays associated with the new inspection requirements.« less

  14. Evaluation of expert systems - An approach and case study. [of determining software functional requirements for command management of satellites

    NASA Technical Reports Server (NTRS)

    Liebowitz, J.

    1985-01-01

    Techniques that were applied in defining an expert system prototype for first-cut evaluations of the software functional requirements of NASA satellite command management activities are described. The prototype was developed using the Knowledge Engineering System. Criteria were selected for evaluating the satellite software before defining the expert system prototype. Application of the prototype system is illustrated in terms of the evaluation procedures used with the COBE satellite to be launched in 1988. The limited number of options which can be considered by the program mandates that biases in the system output must be well understood by the users.

  15. Requirements Engineering in Building Climate Science Software

    ERIC Educational Resources Information Center

    Batcheller, Archer L.

    2011-01-01

    Software has an important role in supporting scientific work. This dissertation studies teams that build scientific software, focusing on the way that they determine what the software should do. These requirements engineering processes are investigated through three case studies of climate science software projects. The Earth System Modeling…

  16. A Method for Increasing the Training Effectiveness of Marine Corps Tactical Exercises: A Pilot Study.

    ERIC Educational Resources Information Center

    Rocklyn, Eugene H.; And Others

    Methods for better utilizing simulated combat systems for training officers are required by the Marine Corps to ensure efficient acquisition of combat decision-making skills. In support of this requirement, a review and analysis of several combat training systems helped to identify a set of major training problems. These included the small number…

  17. Space station needs, attributes and architectural options study. Volume 3: Requirements

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A typical system specification format is presented and requirements are compiled. A Program Specification Tree is shown showing a high inclination space station and a low inclination space station with their typical element breakdown, also represented along the top blocks are the interfaces with other systems. The specification format is directed at the Low Inclination space station.

  18. The Impact of Health System Changes on the Nation's Requirements for Registered Nurses in 1985. Health Manpower References.

    ERIC Educational Resources Information Center

    Doyle, Timothy C.; And Others

    A study was conducted to assess the impact of three anticipated changes in the health care system on the future requirements for registered nurses. The changes investigated were the introduction of national health insurance (NHI), the increased enrollment in health maintenance organizations (HMOs), and the reformulation of nursing roles. Following…

  19. A flexible data fusion architecture for persistent surveillance using ultra-low-power wireless sensor networks

    NASA Astrophysics Data System (ADS)

    Hanson, Jeffrey A.; McLaughlin, Keith L.; Sereno, Thomas J.

    2011-06-01

    We have developed a flexible, target-driven, multi-modal, physics-based fusion architecture that efficiently searches sensor detections for targets and rejects clutter while controlling the combinatoric problems that commonly arise in datadriven fusion systems. The informational constraints imposed by long lifetime requirements make systems vulnerable to false alarms. We demonstrate that our data fusion system significantly reduces false alarms while maintaining high sensitivity to threats. In addition, mission goals can vary substantially in terms of targets-of-interest, required characterization, acceptable latency, and false alarm rates. Our fusion architecture provides the flexibility to match these trade-offs with mission requirements unlike many conventional systems that require significant modifications for each new mission. We illustrate our data fusion performance with case studies that span many of the potential mission scenarios including border surveillance, base security, and infrastructure protection. In these studies, we deployed multi-modal sensor nodes - including geophones, magnetometers, accelerometers and PIR sensors - with low-power processing algorithms and low-bandwidth wireless mesh networking to create networks capable of multi-year operation. The results show our data fusion architecture maintains high sensitivities while suppressing most false alarms for a variety of environments and targets.

  20. Electric System Flexibility and Storage | Energy Analysis | NREL

    Science.gov Websites

    . Featured Studies India Renewable Integration Study Grid Flexibility and Storage Required To Achieve Very demand-in Texas. Key findings from this study include: A highly flexible system with must-run baseload . Publications Renewable Electricity Futures Study. Volume 2: Renewable Electricity Generation and Storage

  1. Requirements Engineering for inter-organizational health information systems with functions for spatial analyses: modeling a WHO safe community applying Use Case Maps.

    PubMed

    Olvingson, C; Hallberg, N; Timpka, T; Lindqvist, K

    2002-01-01

    To evaluate Use Case Maps (UCMs) as a technique for Requirements Engineering (RE) in the development of information systems with functions for spatial analyses in inter-organizational public health settings. In this study, Participatory Action Research (PAR) is used to explore the UCM notation for requirements elicitation and to gather the opinions of the users. The Delphi technique is used to reach consensus in the construction of UCMs. The results show that UCMs can provide a visualization of the system's functionality and in combination with PAR provide a sound basis for gathering requirements in inter-organizational settings. UCMs were found to represent a suitable level for describing the organization and the dynamic flux of information including spatial resolution to all stakeholders. Moreover, by using PAR, the voices of the users and their tacit knowledge is intercepted. Further, UCMs are found useful in generating intuitive requirements by the creation of use cases. With UCMs and PAR it is possible to study the effects of design changes in the general information display and the spatial resolution in the same context. Both requirements on the information system in general and the functions for spatial analyses are possible to elicit when identifying the different responsibilities and the demands on spatial resolution associated to the actions of each administrative unit. However, the development process of UCM is not well documented and needs further investigation and formulation of guidelines.

  2. Air Force Reusable Booster System A Quick-look, Design Focused Modeling and Cost Analysis Study

    NASA Technical Reports Server (NTRS)

    Zapata, Edgar

    2011-01-01

    Presents work supporting the Air force Reusable Booster System (RBS) - A Cost Study with Goals as follows: Support US launch systems decision makers, esp. in regards to the research, technology and demonstration investments required for reusable systems to succeed. Encourage operable directions in Reusable Booster / Launch Vehicle Systems technology choices, system design and product and process developments. Perform a quick-look cost study, while developing a cost model for more refined future analysis.

  3. A Data Management System Integrating Web-based Training and Randomized Trials: Requirements, Experiences and Recommendations.

    PubMed

    Muroff, Jordana; Amodeo, Maryann; Larson, Mary Jo; Carey, Margaret; Loftin, Ralph D

    2011-01-01

    This article describes a data management system (DMS) developed to support a large-scale randomized study of an innovative web-course that was designed to improve substance abuse counselors' knowledge and skills in applying a substance abuse treatment method (i.e., cognitive behavioral therapy; CBT). The randomized trial compared the performance of web-course-trained participants (intervention group) and printed-manual-trained participants (comparison group) to determine the effectiveness of the web-course in teaching CBT skills. A single DMS was needed to support all aspects of the study: web-course delivery and management, as well as randomized trial management. The authors briefly reviewed several other systems that were described as built either to handle randomized trials or to deliver and evaluate web-based training. However it was clear that these systems fell short of meeting our needs for simultaneous, coordinated management of the web-course and the randomized trial. New England Research Institute's (NERI) proprietary Advanced Data Entry and Protocol Tracking (ADEPT) system was coupled with the web-programmed course and customized for our purposes. This article highlights the requirements for a DMS that operates at the intersection of web-based course management systems and randomized clinical trial systems, and the extent to which the coupled, customized ADEPT satisfied those requirements. Recommendations are included for institutions and individuals considering conducting randomized trials and web-based training programs, and seeking a DMS that can meet similar requirements.

  4. NASA Growth Space Station missions and candidate nuclear/solar power systems

    NASA Technical Reports Server (NTRS)

    Heller, Jack A.; Nainiger, Joseph J.

    1987-01-01

    A brief summary is presented of a NASA study contract and in-house investigation on Growth Space Station missions and appropriate nuclear and solar space electric power systems. By the year 2000 some 300 kWe will be needed for missions and housekeeping power for a 12 to 18 person Station crew. Several Space Station configurations employing nuclear reactor power systems are discussed, including shielding requirements and power transmission schemes. Advantages of reactor power include a greatly simplified Station orientation procedure, greatly reduced occultation of views of the earth and deep space, near elimination of energy storage requirements, and significantly reduced station-keeping propellant mass due to very low drag of the reactor power system. The in-house studies of viable alternative Growth Space Station power systems showed that at 300 kWe a rigid silicon solar cell array with NiCd batteries had the highest specific mass at 275 kg/kWe, with solar Stirling the lowest at 40 kg/kWe. However, when 10 year propellant mass requirements are factored in, the 300 kWe nuclear Stirling exhibits the lowest total mass.

  5. Is the Grass Always Greener? Comparing the Environmental Impact of Conventional, Natural and Grass-Fed Beef Production Systems.

    PubMed

    Capper, Judith L

    2012-04-10

    This study compared the environmental impact of conventional, natural and grass-fed beef production systems. A deterministic model based on the metabolism and nutrient requirements of the beef population was used to quantify resource inputs and waste outputs per 1.0 × 10⁸ kg of hot carcass weight beef in conventional (CON), natural (NAT) and grass-fed (GFD) production systems. Production systems were modeled using characteristic management practices, population dynamics and production data from U.S. beef production systems. Increased productivity (slaughter weight and growth rate) in the CON system reduced the cattle population size required to produce 1.0 × 10⁸ kg of beef compared to the NAT or GFD system. The CON system required 56.3% of the animals, 24.8% of the water, 55.3% of the land and 71.4% of the fossil fuel energy required to produce 1.0 × 10⁸ kg of beef compared to the GFD system. The carbon footprint per 1.0 × 10⁸ kg of beef was lowest in the CON system (15,989 × 10³ t), intermediate in the NAT system (18,772 × 10³ t) and highest in the GFD system (26,785 × 10³ t). The challenge to the U.S beef industry is to communicate differences in system environmental impacts to facilitate informed dietary choice.

  6. Technical assistance for law-enforcement communications: Case study report two

    NASA Technical Reports Server (NTRS)

    Reilly, N. B.; Mustain, J. A.

    1979-01-01

    Two case histories are presented. In one study the feasibility of consolidating dispatch center operations for small agencies is considered. System load measurements were taken and queueing analysis applied to determine numbers of personnel required for each separate agency and for a consolidated dispatch center. Functional requirements were developed and a cost model was designed to compare relative costs of various alternatives including continuation of the present system, consolidation of a manual system, and consolidated computer-aided dispatching. The second case history deals with the consideration of a multi-regional, intrastate radio frequency for improved interregional communications. Sample standards and specifications for radio equipment are provided.

  7. Impact of the Patient-Reported Outcomes Management Information System (PROMIS) upon the design and operation of multi-center clinical trials: a qualitative research study.

    PubMed

    Eisenstein, Eric L; Diener, Lawrence W; Nahm, Meredith; Weinfurt, Kevin P

    2011-12-01

    New technologies may be required to integrate the National Institutes of Health's Patient Reported Outcome Management Information System (PROMIS) into multi-center clinical trials. To better understand this need, we identified likely PROMIS reporting formats, developed a multi-center clinical trial process model, and identified gaps between current capabilities and those necessary for PROMIS. These results were evaluated by key trial constituencies. Issues reported by principal investigators fell into two categories: acceptance by key regulators and the scientific community, and usability for researchers and clinicians. Issues reported by the coordinating center, participating sites, and study subjects were those faced when integrating new technologies into existing clinical trial systems. We then defined elements of a PROMIS Tool Kit required for integrating PROMIS into a multi-center clinical trial environment. The requirements identified in this study serve as a framework for future investigators in the design, development, implementation, and operation of PROMIS Tool Kit technologies.

  8. Impact of the Patient-Reported Outcomes Management Information System (PROMIS) upon the Design and Operation of Multi-center Clinical Trials: a Qualitative Research Study

    PubMed Central

    Diener, Lawrence W.; Nahm, Meredith; Weinfurt, Kevin P.

    2013-01-01

    New technologies may be required to integrate the National Institutes of Health’s Patient Reported Outcome Management Information System (PROMIS) into multi-center clinical trials. To better understand this need, we identified likely PROMIS reporting formats, developed a multi-center clinical trial process model, and identified gaps between current capabilities and those necessary for PROMIS. These results were evaluated by key trial constituencies. Issues reported by principal investigators fell into two categories: acceptance by key regulators and the scientific community, and usability for researchers and clinicians. Issues reported by the coordinating center, participating sites, and study subjects were those faced when integrating new technologies into existing clinical trial systems. We then defined elements of a PROMIS Tool Kit required for integrating PROMIS into a multi-center clinical trial environment. The requirements identified in this study serve as a framework for future investigators in the design, development, implementation, and operation of PROMIS Tool Kit technologies. PMID:20703765

  9. District heating with geothermally heated culinary water supply systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pitts, D.R.; Schmitt, R.C.

    1979-09-01

    An initial feasibility study of using existing culinary water supply systems to provide hot water for space heating and air conditioning to a typical residential community is reported. The Phase I study has centered on methods of using low-to-moderate temperature water for heating purposes including institutional barriers, identification and description of a suitable residential commnity water system, evaluation of thermal losses in both the main distribution system and the street mains within the residential district, estimation of size and cost of the pumping station main heat exchanger, sizing of individual residential heat exchangers, determination of pumping and power requirements duemore » to increased flow through the residential area mains, and pumping and power requirements from the street mains through a typical residence. All results of the engineering study of Phase I are encouraging.« less

  10. User needs, benefits and integration of robotic systems in a space station laboratory

    NASA Technical Reports Server (NTRS)

    Farnell, K. E.; Richard, J. A.; Ploge, E.; Badgley, M. B.; Konkel, C. R.; Dodd, W. R.

    1989-01-01

    The methodology, results and conclusions of the User Needs, Benefits, and Integration Study (UNBIS) of Robotic Systems in the Space Station Microgravity and Materials Processing Facility are summarized. Study goals include the determination of user requirements for robotics within the Space Station, United States Laboratory. Three experiments were selected to determine user needs and to allow detailed investigation of microgravity requirements. A NASTRAN analysis of Space Station response to robotic disturbances, and acceleration measurement of a standard industrial robot (Intelledex Model 660) resulted in selection of two ranges of low gravity manipulation: Level 1 (10-3 to 10-5 G at greater than 1 Hz.) and Level 2 (less than = 10-6 G at 0.1 Hz). This included an evaluation of microstepping methods for controlling stepper motors and concluded that an industrial robot actuator can perform milli-G motion without modification. Relative merits of end-effectors and manipulators were studied in order to determine their ability to perform a range of tasks related to the three low gravity experiments. An Effectivity Rating was established for evaluating these robotic system capabilities. Preliminary interface requirements were determined such that definition of requirements for an orbital flight demonstration experiment may be established.

  11. Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 4: OEPSS design concepts

    NASA Technical Reports Server (NTRS)

    Wong, George S.; Ziese, James M.; Farhangi, Shahram

    1990-01-01

    This study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the OEPSS study have been organized into a series of OEPSS Data Books. This volume describes three propulsion concepts that will simplify the propulsion system design and significantly reduce operational requirements. The concepts include: (1) a fully integrated, booster propulsion module concept for the ALS that avoids the complex system created by using autonomous engines with numerous artificial interfaces; (2) an LOX tank aft concept which avoids potentially dangerous geysering in long LOX propellant lines; and (3) an air augmented, rocket engine nozzle afterburning propulsion concept that will significantly reduce LOX propellant requirements, reduce vehicle size and simplify ground operations and ground support equipment and facilities.

  12. Feasibility study of superconducting power cables for DC electric railway feeding systems in view of thermal condition at short circuit accident

    NASA Astrophysics Data System (ADS)

    Kumagai, Daisuke; Ohsaki, Hiroyuki; Tomita, Masaru

    2016-12-01

    A superconducting power cable has merits of a high power transmission capacity, transmission losses reduction, a compactness, etc., therefore, we have been studying the feasibility of applying superconducting power cables to DC electric railway feeding systems. However, a superconducting power cable is required to be cooled down and kept at a very low temperature, so it is important to reveal its thermal and cooling characteristics. In this study, electric circuit analysis models of the system and thermal analysis models of superconducting cables were constructed and the system behaviors were simulated. We analyzed the heat generation by a short circuit accident and transient temperature distribution of the cable to estimate the value of temperature rise and the time required from the accident. From these results, we discussed a feasibility of superconducting cables for DC electric railway feeding systems. The results showed that the short circuit accident had little impact on the thermal condition of a superconducting cable in the installed system.

  13. Real-time simulation of a Doubly-Fed Induction Generator based wind power system on eMEGASimRTM Real-Time Digital Simulator

    NASA Astrophysics Data System (ADS)

    Boakye-Boateng, Nasir Abdulai

    The growing demand for wind power integration into the generation mix prompts the need to subject these systems to stringent performance requirements. This study sought to identify the required tools and procedures needed to perform real-time simulation studies of Doubly-Fed Induction Generator (DFIG) based wind generation systems as basis for performing more practical tests of reliability and performance for both grid-connected and islanded wind generation systems. The author focused on developing a platform for wind generation studies and in addition, the author tested the performance of two DFIG models on the platform real-time simulation model; an average SimpowerSystemsRTM DFIG wind turbine, and a detailed DFIG based wind turbine using ARTEMiSRTM components. The platform model implemented here consists of a high voltage transmission system with four integrated wind farm models consisting in total of 65 DFIG based wind turbines and it was developed and tested on OPAL-RT's eMEGASimRTM Real-Time Digital Simulator.

  14. Research study on antiskid braking systems for the space shuttle

    NASA Technical Reports Server (NTRS)

    Auselmi, J. A.; Weinberg, L. W.; Yurczyk, R. F.; Nelson, W. G.

    1973-01-01

    A research project to investigate antiskid braking systems for the space shuttle vehicle was conducted. System from the Concorde, Boeing 747, Boeing 737, and Lockheed L-1011 were investigated. The characteristics of the Boeing 737 system which caused it to be selected are described. Other subjects which were investigated are: (1) trade studies of brake control concepts, (2) redundancy requirements trade study, (3) laboratory evaluation of antiskid systems, and (4) space shuttle hardware criteria.

  15. Introduction of a Novel Smartphone-Coupled Blood Glucose Monitoring System

    PubMed Central

    Jendrike, Nina; Baumstark, Annette; Chen, Chieh-Hsiao; Rittmeyer, Delia; Haug, Cornelia; Freckmann, Guido

    2017-01-01

    The novel system for self-monitoring of blood glucose (SMBG) PixoTest couples SMBG to a smartphone and does not require a separate glucose meter. The integrated system includes all components necessary for a glucose measurement, and owing to a colorimetric measurement principle, a smartphone camera can capture color changes and a software app calculates the corresponding glucose value. In the presented study, the system was evaluated in terms of system accuracy as described in ISO 15197:2013. It was shown to fulfill system accuracy requirements with 97-99% of results from three different reagent system lots within the accuracy limits and 100% of results within zone A of the consensus error grid. PMID:28459160

  16. Orbital construction demonstration study. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The following items are discussed in reference to OCDA requirements; (1) flight mechanics and control, (2) effects of sun angle, (3) disturbance torques, (4) control system requirements, (5) OCDA orbit decay profile, and (6) aerodynamic drag forces. Structural design requirements are also given as well as basic design definition.

  17. Advanced Sensors and Applications Study (ASAS)

    NASA Technical Reports Server (NTRS)

    Chism, S. B.; Hughes, C. L.

    1976-01-01

    The present EOD requirements for sensors in the space shuttle era are reported with emphasis on those applications which were deemed important enough to warrant separate sections. The application areas developed are: (1) agriculture; (2) atmospheric corrections; (3) cartography; (4) coastal studies; (5) forestry; (6) geology; (7) hydrology; (8) land use; (9) oceanography; and (10) soil moisture. For each application area. The following aspects were covered: (1) specific goals and techniques, (2) individual sensor requirements including types, bands, resolution, etc.; (3) definition of mission requirements, type orbits, coverages, etc.; and (4) discussion of anticipated problem areas and solutions. The remote sensors required for these application areas include; (1) camera systems; (2) multispectral scanners; (3) microwave scatterometers; (4) synthetic aperture radars; (5) microwave radiometers; and (6) vidicons. The emphasis in the remote sensor area was on the evaluation of present technology implications about future systems.

  18. Space station/base food system study. Volume 2: System assessments

    NASA Technical Reports Server (NTRS)

    1970-01-01

    The evaluation modeling technique is described which was used to combine the candidate element concepts into systems that meet mission requirements. Results of the assessment are presented in terms of systems performance data and plots of system trade-off data by highest ranking variable.

  19. Exploring Operational Test and Evaluation of Unmanned Aircraft Systems: A Qualitative Case Study

    NASA Astrophysics Data System (ADS)

    Saliceti, Jose A.

    The purpose of this qualitative case study was to explore and identify strategies that may potentially remedy operational test and evaluation procedures used to evaluate Unmanned Aircraft Systems (UAS) technology. The sample for analysis consisted of organizations testing and evaluating UASs (e.g., U.S. Air Force, U.S. Navy, U.S. Army, U.S. Marine Corps, U.S. Coast Guard, and Customs Border Protection). A purposeful sampling technique was used to select 15 subject matter experts in the field of operational test and evaluation of UASs. A questionnaire was provided to participants to construct a descriptive and robust research. Analysis of responses revealed themes related to each research question. Findings revealed operational testers utilized requirements documents to extrapolate measures for testing UAS technology and develop critical operational issues. The requirements documents were (a) developed without the contribution of stakeholders and operational testers, (b) developed with vague or unrealistic measures, and (c) developed without a systematic method to derive requirements from mission tasks. Four approaches are recommended to develop testable operational requirements and assist operational testers: (a) use a mission task analysis tool to derive requirements for mission essential tasks for the system, (b) exercise collaboration among stakeholders and testers to ensure testable operational requirements based on mission tasks, (c) ensure testable measures are used in requirements documents, and (d) create a repository list of critical operational issues by mission areas. The preparation of operational test and evaluation processes for UAS technology is not uniform across testers. The processes in place are not standardized, thus test plan preparation and reporting are different among participants. A standard method to prepare and report UAS technology should be used when preparing and reporting on UAS technology. Using a systematic process, such as mission-based test design, resonated among participants as an analytical method to link UAS mission tasks and measures of performance to the capabilities of the system under test when developing operational test plans. Further research should examine system engineering designs for system requirements traceability matrix of mission tasks and subtasks while using an analysis tool that adequately evaluates UASs with an acceptable level of confidence in the results.

  20. Mobile radio alternative systems study. Volume 2: Terrestrial. [rural areas

    NASA Technical Reports Server (NTRS)

    Cromwell, N.; Lester, H. L.; Anderson, R. E.

    1983-01-01

    Terrestrial systems for satisfying the markets for mobile radio services in non-urban areas of the United States in the years from 185 to 2000 were investigated. Present day mobile communication technologies, systems and equipment are described for background in evaluating the concepts generated. Average propagation ranges are calculated for terrestrial installations in each of seven physiographic areas of the contiguous states to determine the number of installations that would be required for nationwide coverage. Four system concepts are defined and analyzed to determine how well terrestrial systems can fulfill the requirements at acceptable costs. Nationwide dispatch, telephone and data services would require terrestrial installations in many locations where they would be used infrequently and would not recover their investment. Access to a roaming vehicle requires that the vehicle location be known within the range limit of the terrestrial installation in which the vehicle is present at the time of the call. Access to that installation must be made through the public switched telephone network, usually involving a long-distance toll charge, and requiring costly means to track or locate the vehicle as it moved through the network of installations.

  1. Tolerance Studies of the Mu2e Solenoid System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lopes, M. L.; Ambrosio, G.; Buehler, M.

    2014-01-01

    The muon-to-electron conversion experiment at Fermilab is designed to explore charged lepton flavor violation. It is composed of three large superconducting solenoids, namely, the production solenoid, the transport solenoid, and the detector solenoid. Each subsystem has a set of field requirements. Tolerance sensitivity studies of the magnet system were performed with the objective of demonstrating that the present magnet design meets all the field requirements. Systematic and random errors were considered on the position and alignment of the coils. The study helps to identify the critical sources of errors and which are translated to coil manufacturing and mechanical support tolerances.

  2. An Analysis of State and Local Alignment of Teacher Evaluation in Maryland

    ERIC Educational Resources Information Center

    Peterson, Serene N.

    2014-01-01

    This study explored the components of Maryland's newly-implemented teacher evaluation framework and compared state requirements with evaluations to three local school systems' evaluation procedures. The study sought to investigate the relationship between three evaluation protocols in comparison to the state requirements. Three local school…

  3. The need for a comprehensive expert system development methodology

    NASA Technical Reports Server (NTRS)

    Baumert, John; Critchfield, Anna; Leavitt, Karen

    1988-01-01

    In a traditional software development environment, the introduction of standardized approaches has led to higher quality, maintainable products on the technical side and greater visibility into the status of the effort on the management side. This study examined expert system development to determine whether it differed enough from traditional systems to warrant a reevaluation of current software development methodologies. Its purpose was to identify areas of similarity with traditional software development and areas requiring tailoring to the unique needs of expert systems. A second purpose was to determine whether existing expert system development methodologies meet the needs of expert system development, management, and maintenance personnel. The study consisted of a literature search and personal interviews. It was determined that existing methodologies and approaches to developing expert systems are not comprehensive nor are they easily applied, especially to cradle to grave system development. As a result, requirements were derived for an expert system development methodology and an initial annotated outline derived for such a methodology.

  4. A study on an information security system of a regional collaborative medical platform.

    PubMed

    Zhao, Junping; Peng, Kun; Leng, Jinchang; Sun, Xiaowei; Zhang, Zhenjiang; Xue, Wanguo; Ren, Lianzhong

    2010-01-01

    The objective of this study was to share the experience of building an information security system for a regional collaborative medical platform (RCMP) and discuss the lessons learned from practical projects. Safety measures are analyzed from the perspective of system engineering. We present the essential requirements, critical architectures, and policies for system security of regional collaborative medical platforms.

  5. HL-20 operations and support requirements for the Personnel Launch System mission

    NASA Technical Reports Server (NTRS)

    Morris, W. D.; White, Nancy H.; Caldwell, Ronald G.

    1993-01-01

    The processing, mission planning, and support requirements were defined for the HL-20 lifting-body configuration that can serve as a Personnel Launch System. These requirements were based on the assumption of an operating environment that incorporates aircraft and airline support methods and techniques that are applicable to operations. The study covered the complete turnaround process for the HL-20, including landing through launch, and mission operations, but did not address the support requirements of the launch vehicle except for the integrated activities. Support is defined in terms of manpower, staffing levels, facilities, ground support equipment, maintenance/sparing requirements, and turnaround processing time. Support results were drawn from two contracted studies, plus an in-house analysis used to define the maintenance manpower. The results of the contracted studies were used as the basis for a stochastic simulation of the support environment to determine the sufficiency of support and the effect of variance on vehicle processing. Results indicate the levels of support defined for the HL-20 through this process to be sufficient to achieve the desired flight rate of eight flights per year.

  6. Satellite services system analysis study. Volume 3: Service equipment requirements

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.

  7. Intelligent Planning and Scheduling for Controlled Life Support Systems

    NASA Technical Reports Server (NTRS)

    Leon, V. Jorge

    1996-01-01

    Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

  8. Estimates of the Officer Force Structure Required to Man the Projected Naval Combatant Forces of the 1980s and 1990s.

    DTIC Science & Technology

    1980-10-01

    Element, 64709N Prototype Manpower/Personnel Systems (U), Project Z1302-PN Officer Career Models (U), funded by the Office of the Deputy Assistant... Models for Navy Officer Billets portion of the proposed NPS research effort to develop an integrated officer system planning model ; the purpose of this...attempting to model the Naval officer force structure as a system. This study considers the primary first order factors which drive the requirements

  9. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  10. Space telescopes planetary monitoring (PM) and Zvezdny (eng. star) patrol (ZP) for planetary science and exoplanets exploration

    NASA Astrophysics Data System (ADS)

    Tavrov, Alexander; Frolov, Pavel; Korablev, Oleg; Vedenkin, Nikolai; Barabanov, Sergey

    2017-11-01

    Solar System planetology requires a wide use of observing spectroscopy for surface geology to atmosphere climatology. A high-contrast imaging is required to study and to characterize extra-solar planetary systems among other faint astronomical targets observed in the vicinity of bright objects. Two middle class space telescopes projects aimed to observe Solar system planets by a long term monitoring via spectroscopy and polarimetry. Extra solar planets (exoplanets) engineering and scientific explorations are included in science program.

  11. The Nett Warrior System: A Case Study for the Acquisition of Soldier Systems

    DTIC Science & Technology

    2011-12-15

    rpfkbpp=C=mr_if`=mlif`v - 10 - k^s^i=mlpqdo^ar^qb=p`elli The evolution of wearable computers continued as an open system– bus wearable design was...established. The success of NW will depend on the program?s ability to incorporate soldier-driven design requirements, commercial technology, and...on the program’s ability to incorporate soldier-driven design requirements, commercial technology, and thorough system testing.   = = ^Åèìáëáíáçå

  12. Singlet oxygen detection in biological systems: Uses and limitations.

    PubMed

    Koh, Eugene; Fluhr, Robert

    2016-07-02

    The study of singlet oxygen in biological systems is challenging in many ways. Singlet oxygen is a relatively unstable ephemeral molecule, and its properties make it highly reactive with many biomolecules, making it difficult to quantify accurately. Several methods have been developed to study this elusive molecule, but most studies thus far have focused on those conditions that produce relatively large amounts of singlet oxygen. However, the need for more sensitive methods is required as one begins to explore the levels of singlet oxygen required in signaling and regulatory processes. Here we discuss the various methods used in the study of singlet oxygen, and outline their uses and limitations.

  13. Tracking and data relay satellite system configuration and tradeoff study, part 1. Volume 3: Telecommunications service system

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The results of the telecommunications subsystem analysis are presented. The relay system requirements and constraints, interference analysis, frequency selection, modulation and coding analysis, and the performance analysis of the relay system are included.

  14. High-speed civil transport study

    NASA Technical Reports Server (NTRS)

    1989-01-01

    A system study of the potential for a high-speed commercial transport has addressed technological, economic, and environmental constraints. Market projections indicate a need for fleets of transports with supersonic or greater cruise speeds by the year 2000 to 2005. The associated design requirements called for a vehicle to carry 250 to 300 passengers over a range of 5,000 to 6,000 nautical miles. The study was initially unconstrained in terms of vehicle characteristic, such as cruise speed, propulsion systems, fuels, or structural materials. Analyses led to a focus on the most promising vehicle concepts. These were concepts that used a kerosene-type fuel and cruised at Mach numbers between 2.0 to 3.2. Further systems study identified the impact of environmental constraints (for community noise, sonic boom, and engine emissions) on economic attractiveness and technological needs. Results showed that current technology cannot produce a viable high-speed civil transport; significant advances are required to reduce takeoff gross weight and allow for both economic attractiveness and environmental accepatability. Specific technological requirements were identified to meet these needs.

  15. Concepts for Multi-Speed Rotorcraft Drive System - Status of Design and Testing at NASA GRC

    NASA Technical Reports Server (NTRS)

    Stevens, Mark A.; Lewicki, David G.; Handschuh, Robert F.

    2015-01-01

    In several studies and on-going developments for advanced rotorcraft, the need for variable multi-speed capable rotors has been raised. Speed changes of up to 50 have been proposed for future rotorcraft to improve vehicle performance. A rotor speed change during operation not only requires a rotor that can perform effectively over the operating speedload range, but also requires a propulsion system possessing these same capabilities. A study was completed investigating possible drive system arrangements that can accommodate up to a 50 speed change. Key drivers were identified from which simplicity and weight were judged as central. This paper presents the current status of two gear train concepts coupled with the first of two clutch types developed and tested thus far with focus on design lessons learned and areas requiring development. Also, a third concept is presented, a dual input planetary differential as leveraged from a simple planetary with fixed carrier.

  16. Future space transportation systems analysis study. Phase 1: Technical report, appendices. [a discussion of orbit transfer vehicles, lunar transport vehicles, space shuttles, and reusable spacecraft

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The transportation mass requirements developed for each mission and transportation mode were based on vehicle systems sized to fit the exact needs of each mission (i.e. rubber vehicles). The parametric data used to derive the mass requirements for each mission and transportation mode are presented to enable accommodation of possible changes in mode options or payload definitions. The vehicle sizing and functional requirements used to derive the parametric data will form the basis for conceptual configurations of the transportation elements in a later phase of study. An investigation of the weight growth approach to future space transportation systems analysis is presented. Parameters which affect weight growth, past weight histories, and the current state of future space-mission design are discussed. Weight growth factors of from 10 percent to 41 percent were derived for various missions or vehicles.

  17. Requirements for a transformerless power conditioning system

    NASA Technical Reports Server (NTRS)

    Klein, J.; Koerner, T.; Rippel, W.; Kalbach, J.

    1984-01-01

    Requirements for development of a Transformerless Power Conditioning Subsystem (TPCS) that will meet utility, manufacturer, and customer needs are detailed. Issues analyzed include current utility guidelines, safety and grounding issues that appear as local codes, various kinds of TPCS connections that can be developed, dc injection, and a brief survey of TPCS circuit topologies that will meet requirements. The major result is that a finite time exists for control operation before dc injection into the distribution transformer causes customer outage (on the order of seconds). This time permits the control system to sense a dc injection condition and remove the TPCS from the utility system. Requirements for such a control system are specified. A three wire connection will ensure balanced operation for customer loads and two wire connections caused average value dc to be injected into single phase loads. This type of connection also allows for the lowest array voltage. The conclusion is that requirements for a TPCS can be determined and that there are not showstopping issues preventing implementation. The actual design and topology of the TPCS was left for further study.

  18. Mars manned transportation vehicle

    NASA Technical Reports Server (NTRS)

    Perez-Davis, Marla E.; Faymon, Karl A.

    1987-01-01

    A viable power system technology for a surface transportation vehicle to explore the planet Mars is presented. A number of power traction systems were investigated, and it was found that a regenerative hydrogen-oxygen fuel cell appears to be attractive for a manned Mars rover application. Mission requirements were obtained from the Manned Mars Mission Working Group. Power systems weights, power, and reactants requirements were determined as a function of vehicle weights for vehicles weighing from 6,000 to 16,000 lb (2,722 to 7,257 kg), (Earth weight). The vehicle performance requirements were: velocity, 10 km/hr; range, 100 km; slope climbing capability, 30 deg uphill for 50 km; mission duration, 5 days; and crew, 5. Power requirements for the operation of scientific equipment and support system capabilities were also specified and included in this study. The concept developed here would also be applicable to a Lunar based vehicle for Lunar exploration. The reduced gravity on the Lunar surface, (over that on the Martian surface), would result in an increased range or capability over that of the Mars vehicle since many of the power and energy requirements for the vehicle are gravity dependent.

  19. Requirements' Role in Mobilizing and Enabling Design Conversation

    NASA Astrophysics Data System (ADS)

    Bergman, Mark

    Requirements play a critical role in a design conversation of systems and products. Product and system design exists at the crossroads of problems, solutions and requirements. Requirements contextualize problems and solutions, pointing the way to feasible outcomes. These are captured with models and detailed specifications. Still, stakeholders need to be able to understand one-another using shared design representations in order to mobilize bias and transform knowledge towards legitimized, desired results. Many modern modeling languages, including UML, as well as detailed, logic-based specifications are beyond the comprehension of key stakeholders. Hence, they inhibit, rather than promote design conversation. Improved design boundary objects (DBO), especially design requirements boundary objects (DRBO), need to be created and refined to improve the communications between principals. Four key features of design boundary objects that improve and promote design conversation are discussed in detail. A systems analysis and design case study is presented which demonstrates these features in action. It describes how a small team of analysts worked with key stakeholders to mobilize and guide a complex system design discussion towards an unexpected, yet desired outcome within a short time frame.

  20. IUS/payload communication system simulator configuration definition study. [payload simulator for pcm telemetry

    NASA Technical Reports Server (NTRS)

    Udalov, S.; Springett, J. C.

    1978-01-01

    The requirements and specifications for a general purpose payload communications system simulator to be used to emulate those communications system portions of NASA and DOD payloads/spacecraft that will in the future be carried into earth orbit by the shuttle are discussed. For the purpose of on-orbit checkout, the shuttle is required to communicate with the payloads while they are physically located within the shuttle bay (attached) and within a range of 20 miles from the shuttle after they have been deployed (detached). Many of the payloads are also under development (and many have yet to be defined), actual payload communication hardware will not be available within the time frame during which the avionic hardware tests will be conducted. Thus, a flexible payload communication system simulator is required.

  1. Global Hawk Systems Engineering. Case Study

    DTIC Science & Technology

    2010-01-01

    Management Core System ( TBMCS ) (complex software development) • F-111 Fighter (joint program with significant involvement by the Office of the...Software Requirements Specification TACC Tailored Airworthiness Certification Criteria TBMCS Theater Battle Management Core System TEMP Test and

  2. Feasibility study of a real-time operating system for a multichannel MPEG-4 encoder

    NASA Astrophysics Data System (ADS)

    Lehtoranta, Olli; Hamalainen, Timo D.

    2005-03-01

    Feasibility of DSP/BIOS real-time operating system for a multi-channel MPEG-4 encoder is studied. Performances of two MPEG-4 encoder implementations with and without the operating system are compared in terms of encoding frame rate and memory requirements. The effects of task switching frequency and number of parallel video channels to the encoding frame rate are measured. The research is carried out on a 200 MHz TMS320C6201 fixed point DSP using QCIF (176x144 pixels) video format. Compared to a traditional DSP implementation without an operating system, inclusion of DSP/BIOS reduces total system throughput only by 1 QCIF frames/s. The operating system has 6 KB data memory overhead and program memory requirement of 15.7 KB. Hence, the overhead is considered low enough for resource critical mobile video applications.

  3. Cryogenic On-Orbit Liquid Depot-Storage, Acquisition and Transfer (COLD-SAT) Experiment Conceptual Design and Feasibility Study

    NASA Technical Reports Server (NTRS)

    Kramer, Edward (Editor)

    1998-01-01

    The cryogenic fluid management technologies required for the exploration of the solar system can only be fully developed via space-based experiments. A dedicated spacecraft is the most efficient way to perform these experiments. This report documents the extended conceptual design of the COLD-SAT spacecraft, capable of meeting these experimental requirements. All elements, including the spacecraft, ground segment, launch site modifications and launch vehicle operations, and flight operations are included. Greatly expanded coverage is provided for those areas unique to this cryogenic spacecraft, such as the experiment system, attitude control system, and spacecraft operations. Supporting analyses are included as are testing requirements, facilities surveys, and proposed project timelines.

  4. Balloon concepts for scientific investigation of Mars and Jupiter

    NASA Technical Reports Server (NTRS)

    Ash, R. L.

    1979-01-01

    Opportunities for scientific investigation of the atmospheric planets using buoyant balloons have been explored. Mars and Jupiter were considered in this study because design requirements at those planets bracket nominally the requirements at Venus, and plans are already underway for a joint Russian-French balloon system at Venus. Viking data has provided quantitative information for definition of specific balloon systems at Mars. Free flying balloons appear capable of providing valuable scientific support for more sophisticated Martian surface probes, but tethered and powered aerostats are not attractive. The Jovian environment is so extreme, hot atmosphere balloons may be the only scientific platforms capable of extended operations there. However, the estimated system mass and thermal energy required are very large.

  5. Selection of a surface tension propellant management system for the Viking 75 Orbiter.

    NASA Technical Reports Server (NTRS)

    Dowdy, M. W.; Debrock, S. C.

    1972-01-01

    Discussion of the propellant management system requirements derived for the Viking 75 mission, and review of a series of surface tension propellant management system design concepts. The chosen concept is identified and its mission operation described. The ullage bubble and bulk liquid positioning characteristics are presented, along with propellant dynamic considerations entailed by thrust initiation/termination. Pressurization design considerations, required to assure minimum disturbance to the bulk propellant, are introduced as well as those of the tank ullage vent. Design provisions to assure liquid communication between tank ends are discussed. Results of a preliminary design study are presented, including mechanical testing requirements to assure structural integrity, propellant compatibility, and proper installation.

  6. Global Positioning System (GPS) civil signal monitoring (CSM) trade study report

    DOT National Transportation Integrated Search

    2014-03-07

    This GPS Civil Signal Monitoring (CSM) Trade Study has been performed at the direction of DOT/FAA Navigation Programs as the agency of reference for consolidating civil monitoring requirements on the Global Positioning System (GPS). The objective of ...

  7. A study of system requirements for Phobos/Deimos missions. Volume 2: Phase 1 results, satellite rendezvous and landing missions

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The feasibility of a satellite rendezvous, landing, and roving mission to the Martian satellites Phobos and Deimos is considered. Mission-oriented analysis, systems analysis, and conceptual design studies are presented.

  8. Geostationary platform systems concepts definition follow-on study. Volume 2A: Technical Task 2 LSST special emphasis

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The results of the Large Space Systems Technology special emphasis task are presented. The task was an analysis of structural requirements deriving from the initial Phase A Operational Geostationary Platform study.

  9. FY04 Advanced Life Support Architecture and Technology Studies: Mid-Year Presentation

    NASA Technical Reports Server (NTRS)

    Lange, Kevin; Anderson, Molly; Duffield, Bruce; Hanford, Tony; Jeng, Frank

    2004-01-01

    Long-Term Objective: Identify optimal advanced life support system designs that meet existing and projected requirements for future human spaceflight missions. a) Include failure-tolerance, reliability, and safe-haven requirements. b) Compare designs based on multiple criteria including equivalent system mass (ESM), technology readiness level (TRL), simplicity, commonality, etc. c) Develop and evaluate new, more optimal, architecture concepts and technology applications.

  10. Space Station Systems Analysis Study. Volume 1: Executive summary, part 1 and 2

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The elements of space station programs required to support an operational base theme, a space laboratory theme, and advanced missions relatable to public needs/national interests are defined. Missions satisfying the foregoing requirements are identified, program scenarios/options are established. System options are evaluated for a selected number of program options. Subsystem analysis and programmatic comparisons are performed for selected primary concepts.

  11. Advanced optical sensing and processing technologies for the distributed control of large flexible spacecraft

    NASA Technical Reports Server (NTRS)

    Williams, G. M.; Fraser, J. C.

    1991-01-01

    The objective was to examine state-of-the-art optical sensing and processing technology applied to control the motion of flexible spacecraft. Proposed large flexible space systems, such an optical telescopes and antennas, will require control over vast surfaces. Most likely distributed control will be necessary involving many sensors to accurately measure the surface. A similarly large number of actuators must act upon the system. The used technical approach included reviewing proposed NASA missions to assess system needs and requirements. A candidate mission was chosen as a baseline study spacecraft for comparison of conventional and optical control components. Control system requirements of the baseline system were used for designing both a control system containing current off-the-shelf components and a system utilizing electro-optical devices for sensing and processing. State-of-the-art surveys of conventional sensor, actuator, and processor technologies were performed. A technology development plan is presented that presents a logical, effective way to develop and integrate advancing technologies.

  12. Elements of oxygen production systems using Martian atmosphere

    NASA Technical Reports Server (NTRS)

    Ash, R. L.; Huang, J.-K.; Johnson, P. B.; Sivertson, W. E., Jr.

    1986-01-01

    Hardware elements have been studied in terms of their applicability to Mars oxygen production systems. Various aspects of the system design are discussed and areas requiring further research are identified. Initial work on system reliability is discussed and a methodology for applying expert system technology to the oxygen processor is described.

  13. A Trade Study of Two Membrane-Aerated Biological Water Processors

    NASA Technical Reports Server (NTRS)

    Allada, Ram; Lange, Kevin; Vega. Leticia; Roberts, Michael S.; Jackson, Andrew; Anderson, Molly; Pickering, Karen

    2011-01-01

    Biologically based systems are under evaluation as primary water processors for next generation life support systems due to their low power requirements and their inherent regenerative nature. This paper will summarize the results of two recent studies involving membrane aerated biological water processors and present results of a trade study comparing the two systems with regards to waste stream composition, nutrient loading and system design. Results of optimal configurations will be presented.

  14. Sensible heat receiver for solar dynamic space power system

    NASA Technical Reports Server (NTRS)

    Perez-Davis, Marla E.; Gaier, James R.; Petrefski, Chris

    1991-01-01

    A sensible heat receiver considered in this study uses a vapor grown carbon fiber-carbon (VGCF/C) composite as the thermal storage media and was designed for a 7 kW Brayton engine. The proposed heat receiver stores the required energy to power the system during eclipse in the VGCF/C composite. The heat receiver thermal analysis was conducted through the Systems Improved Numerical Differencing Analyzer and Fluid Integrator (SINDA) software package. The sensible heat receiver compares well with other latent and advanced sensible heat receivers analyzed in other studies while avoiding the problems associated with latent heat storage salts and liquid metal heat pipes. The concept also satisfies the design requirements for a 7 kW Brayton engine system. The weight and size of the system can be optimized by changes in geometry and technology advances for this new material.

  15. Automatic vehicle monitoring systems study. Report of phase O. Volume 2: Problem definition and derivation of AVM system selection techniques

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A set of planning guidelines is presented to help law enforcement agencies and vehicle fleet operators decide which automatic vehicle monitoring (AVM) system could best meet their performance requirements. Improvements in emergency response times and resultant cost benefits obtainable with various operational and planned AVM systems may be synthesized and simulated by means of special computer programs for model city parameters applicable to small, medium and large urban areas. Design characteristics of various AVM systems and the implementation requirements are illustrated and cost estimated for the vehicles, the fixed sites and the base equipments. Vehicle location accuracies for different RF links and polling intervals are analyzed. Actual applications and coverage data are tabulated for seven cities whose police departments actively cooperated in the study.

  16. Evaluating Evaluation Systems: Policy Levers and Strategies for Studying Implementation of Educator Evaluation. Policy Snapshot

    ERIC Educational Resources Information Center

    Matlach, Lauren

    2015-01-01

    Evaluation studies can provide feedback on implementation, support continuous improvement, and increase understanding of evaluation systems' impact on teaching and learning. Despite the importance of educator evaluation studies, states often need support to prioritize and fund them. Successful studies require expertise, time, and a shared…

  17. Regenerable thermal control and carbon dioxide control techniques for use in advanced extravehicular protective systems

    NASA Technical Reports Server (NTRS)

    Williams, J. L.; Copeland, R. J.; Nebbon, B. W.

    1972-01-01

    The most promising closed CO2 control concept identified by this study is the solid pellet, Mg(OH2)2 system. Two promising approaches to closed thermal control were identified. The AHS system uses modular fusible heat sinks, with a contingency evaporative mode, to allow maximum EVA mobility. The AHS/refrigerator top-off subsystem requires an umbilical to minimize expendables, but less EVA time is used to operate the system, since there is no requirement to change modules. Both of these subsystems are thought to be practical solutions to the problem of providing closed heat rejection for an EVA system.

  18. Earth Observatory Satellite system definition study. Report 5: System design and specifications. Volume 5: Specification for EROS operations control center

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The functional, performance, and design requirements for the Operations Control Center (OCC) of the Earth Observatory Satellite (EOS) system are presented. The OCC controls the operations of the EOS satellite to acquire mission data consisting of: (1) thematic mapper data, (2) multispectral scanner data on EOS-A, or High Resolution Pointable Imager data on EOS-B, and (3) data collection system (DCS) data. The various inputs to the OCC are identified. The functional requirements of the OCC are defined. The specific systems and subsystems of the OCC are described and block diagrams are provided.

  19. Requirements for Successful Adoption of a Glucose Measurement System Into a Hospital POC Program.

    PubMed

    Füzéry, Anna K; Cembrowski, George S

    2016-07-01

    Widespread and successful implementation of any glucose measurement system in a hospital point-of-care (POC) program requires a number of features in addition to accurate and reliable analytical performance. Such features include, but are not limited to, a system's glucose-hematocrit dependence, durability, information technology capabilities, and battery capacity and battery life. While the study of Ottiger et al in this issue supports the analytical accuracy and reliability of Bayer's CONTOUR XT® blood glucose monitoring system, the suitability of other features of this system for a hospital POC program remains to be established. © 2016 Diabetes Technology Society.

  20. Shuttle cryogenics supply system. Optimization study. Volume 5 B-4: Programmers manual for space shuttle orbit injection analysis (SOPSA)

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A computer program for space shuttle orbit injection propulsion system analysis (SOPSA) is described to show the operational characteristics and the computer system requirements. The program was developed as an analytical tool to aid in the preliminary design of propellant feed systems for the space shuttle orbiter main engines. The primary purpose of the program is to evaluate the propellant tank ullage pressure requirements imposed by the need to accelerate propellants rapidly during the engine start sequence. The SOPSA program will generate parametric feed system pressure histories and weight data for a range of nominal feedline sizes.

  1. 46 CFR 63.20-1 - Specific control system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Specific control system requirements. 63.20-1 Section 63... AUXILIARY BOILERS Additional Control System Requirements § 63.20-1 Specific control system requirements. In... following requirements apply for specific control systems: (a) Primary safety control system. Following...

  2. 46 CFR 63.20-1 - Specific control system requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Specific control system requirements. 63.20-1 Section 63... AUXILIARY BOILERS Additional Control System Requirements § 63.20-1 Specific control system requirements. In... following requirements apply for specific control systems: (a) Primary safety control system. Following...

  3. Establishment of Requirements and Methodology for the Development and Implementation of GreyMatters, a Memory Clinic Information System.

    PubMed

    Tapuria, Archana; Evans, Matt; Curcin, Vasa; Austin, Tony; Lea, Nathan; Kalra, Dipak

    2017-01-01

    The aim of the paper is to establish the requirements and methodology for the development process of GreyMatters, a memory clinic system, outlining the conceptual, practical, technical and ethical challenges, and the experiences of capturing clinical and research oriented data along with the implementation of the system. The methodology for development of the information system involved phases of requirements gathering, modeling and prototype creation, and 'bench testing' the prototype with experts. The standard Institute of Electrical and Electronics Engineers (IEEE) recommended approach for the specifications of software requirements was adopted. An electronic health record (EHR) standard, EN13606 was used, and clinical modelling was done through archetypes and the project complied with data protection and privacy legislation. The requirements for GreyMatters were established. Though the initial development was complex, the requirements, methodology and standards adopted made the construction, deployment, adoption and population of a memory clinic and research database feasible. The electronic patient data including the assessment scales provides a rich source of objective data for audits and research and to establish study feasibility and identify potential participants for the clinical trials. The establishment of requirements and methodology, addressing issues of data security and confidentiality, future data compatibility and interoperability and medico-legal aspects such as access controls and audit trails, led to a robust and useful system. The evaluation supports that the system is an acceptable tool for clinical, administrative, and research use and forms a useful part of the wider information architecture.

  4. StakeMeter: value-based stakeholder identification and quantification framework for value-based software systems.

    PubMed

    Babar, Muhammad Imran; Ghazali, Masitah; Jawawi, Dayang N A; Bin Zaheer, Kashif

    2015-01-01

    Value-based requirements engineering plays a vital role in the development of value-based software (VBS). Stakeholders are the key players in the requirements engineering process, and the selection of critical stakeholders for the VBS systems is highly desirable. Based on the stakeholder requirements, the innovative or value-based idea is realized. The quality of the VBS system is associated with the concrete set of valuable requirements, and the valuable requirements can only be obtained if all the relevant valuable stakeholders participate in the requirements elicitation phase. The existing value-based approaches focus on the design of the VBS systems. However, the focus on the valuable stakeholders and requirements is inadequate. The current stakeholder identification and quantification (SIQ) approaches are neither state-of-the-art nor systematic for the VBS systems. The existing approaches are time-consuming, complex and inconsistent which makes the initiation process difficult. Moreover, the main motivation of this research is that the existing SIQ approaches do not provide the low level implementation details for SIQ initiation and stakeholder metrics for quantification. Hence, keeping in view the existing SIQ problems, this research contributes in the form of a new SIQ framework called 'StakeMeter'. The StakeMeter framework is verified and validated through case studies. The proposed framework provides low-level implementation guidelines, attributes, metrics, quantification criteria and application procedure as compared to the other methods. The proposed framework solves the issues of stakeholder quantification or prioritization, higher time consumption, complexity, and process initiation. The framework helps in the selection of highly critical stakeholders for the VBS systems with less judgmental error.

  5. An Experimental Study of the Emergence of Human Communication Systems

    ERIC Educational Resources Information Center

    Galantucci, Bruno

    2005-01-01

    The emergence of human communication systems is typically investigated via 2 approaches with complementary strengths and weaknesses: naturalistic studies and computer simulations. This study was conducted with a method that combines these approaches. Pairs of participants played video games requiring communication. Members of a pair were…

  6. A real time Pegasus propulsion system model for VSTOL piloted simulation evaluation

    NASA Technical Reports Server (NTRS)

    Mihaloew, J. R.; Roth, S. P.; Creekmore, R.

    1981-01-01

    A real time propulsion system modeling technique suitable for use in man-in-the-loop simulator studies was developd. This technique provides the system accuracy, stability, and transient response required for integrated aircraft and propulsion control system studies. A Pegasus-Harrier propulsion system was selected as a baseline for developing mathematical modeling and simulation techniques for VSTOL. Initially, static and dynamic propulsion system characteristics were modeled in detail to form a nonlinear aerothermodynamic digital computer simulation of a Pegasus engine. From this high fidelity simulation, a real time propulsion model was formulated by applying a piece-wise linear state variable methodology. A hydromechanical and water injection control system was also simulated. The real time dynamic model includes the detail and flexibility required for the evaluation of critical control parameters and propulsion component limits over a limited flight envelope. The model was programmed for interfacing with a Harrier aircraft simulation. Typical propulsion system simulation results are presented.

  7. Space shuttle propulsion systems on-board checkout and monitoring system development study (extension). Volume 2: Guidelines for for incorporation of the onboard checkout and monitoring function on the space shuttle

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Guidelines are presented for incorporation of the onboard checkout and monitoring function (OCMF) into the designs of the space shuttle propulsion systems. The guidelines consist of and identify supporting documentation; requirements for formulation, implementation, and integration of OCMF; associated compliance verification techniques and requirements; and OCMF terminology and nomenclature. The guidelines are directly applicable to the incorporation of OCMF into the design of space shuttle propulsion systems and the equipment with which the propulsion systems interface. The techniques and general approach, however, are also generally applicable to OCMF incorporation into the design of other space shuttle systems.

  8. Feasibility study of wireless power transmission systems

    NASA Technical Reports Server (NTRS)

    Robinson, W. J., Jr.

    1968-01-01

    Wireless microwave or laser energy transfers power from a manned earth-orbiting central station to unmanned astronomical substations. More efficient systems are required for the microwave power transmission.

  9. A multi-agent system for monitoring patient flow.

    PubMed

    Rosati, Samanta; Tralli, Augusta; Balestra, Gabriella

    2013-01-01

    Patient flow within a healthcare facility may follow different and, sometimes, complicated paths. Each path phase is associated with the documentation of the activities carried out during it and may require the consultation of clinical guidelines, medical literature and the use of specific software and decision aid systems. In this study we present the design of a Patient Flow Management System (PFMS) based on Multi Agent Systems (MAS) methodology. System requirements were identified by means of process modeling tools and a MAS consisting of six agents was designed and is under construction. Its main goal is to support both the medical staff during the health care process and the hospital managers in assuring that all the required documentation is completed and available. Moreover, such a tool can be used for the assessment and comparison of different clinical pathways, in order to identify possible improvementsand the optimum patient flow.

  10. An evaluation of oxygen-hydrogen propulsion systems for the Space Station

    NASA Technical Reports Server (NTRS)

    Klemetson, R. W.; Garrison, P. W.; Hannum, N. P.

    1985-01-01

    Conceptual designs for O2/H2 chemical and resistojet propulsion systems for the space station was developed and evaluated. The evolution of propulsion requirements was considered as the space station configuration and its utilization as a space transportation node change over the first decade of operation. The characteristics of candidate O2/H2 auxiliary propulsion systems are determined, and opportunities for integration with the OTV tank farm and the space station life support, power and thermal control subsystems are investigated. OTV tank farm boiloff can provide a major portion of the growth station impulse requirements and CO2 from the life support system can be a significant propellant resource, provided it is not denied by closure of that subsystem. Waste heat from the thermal control system is sufficient for many propellant conditioning requirements. It is concluded that the optimum level of subsystem integration must be based on higher level space station studies.

  11. Advanced nickel-hydrogen cell configuration study

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Long-term trends in the evolution of space power technology point toward increased payload power demand which in turn translates into both higher battery system charge storage capability and higher operating voltages. State of the art nickel-hydrogen cells of the 50 to 60 Wh size, packaged in individual pressure vessels, are capable of meeting the required cycle life for a wide range of anticipated operating conditions; however, they provided several drawbacks to battery system integrated efforts. Because of size, high voltage/high power systems require integrating hundreds of cells into the operating system. Packaging related weight and volume inefficiencies degrade the energy density and specific energy of individual cells currently at 30 Wh/cudm and 40 Wh/kg respectively. In addition, the increased parts count and associated handling significantly affect the overall battery related costs. Spacecraft battery systems designers within industry and Government realize that to reduce weight, volume, and cost requires increases in the capacity of nickel-hydrogen cells.

  12. Integrating a geographic information system, a scientific visualization system and an orographic precipitation model

    USGS Publications Warehouse

    Hay, L.; Knapp, L.

    1996-01-01

    Investigating natural, potential, and man-induced impacts on hydrological systems commonly requires complex modelling with overlapping data requirements, and massive amounts of one- to four-dimensional data at multiple scales and formats. Given the complexity of most hydrological studies, the requisite software infrastructure must incorporate many components including simulation modelling, spatial analysis and flexible, intuitive displays. There is a general requirement for a set of capabilities to support scientific analysis which, at this time, can only come from an integration of several software components. Integration of geographic information systems (GISs) and scientific visualization systems (SVSs) is a powerful technique for developing and analysing complex models. This paper describes the integration of an orographic precipitation model, a GIS and a SVS. The combination of these individual components provides a robust infrastructure which allows the scientist to work with the full dimensionality of the data and to examine the data in a more intuitive manner.

  13. Facebook for scientists: requirements and services for optimizing how scientific collaborations are established.

    PubMed

    Schleyer, Titus; Spallek, Heiko; Butler, Brian S; Subramanian, Sushmita; Weiss, Daniel; Poythress, M Louisa; Rattanathikun, Phijarana; Mueller, Gregory

    2008-08-13

    As biomedical research projects become increasingly interdisciplinary and complex, collaboration with appropriate individuals, teams, and institutions becomes ever more crucial to project success. While social networks are extremely important in determining how scientific collaborations are formed, social networking technologies have not yet been studied as a tool to help form scientific collaborations. Many currently emerging expertise locating systems include social networking technologies, but it is unclear whether they make the process of finding collaborators more efficient and effective. This study was conducted to answer the following questions: (1) Which requirements should systems for finding collaborators in biomedical science fulfill? and (2) Which information technology services can address these requirements? The background research phase encompassed a thorough review of the literature, affinity diagramming, contextual inquiry, and semistructured interviews. This phase yielded five themes suggestive of requirements for systems to support the formation of collaborations. In the next phase, the generative phase, we brainstormed and selected design ideas for formal concept validation with end users. Then, three related, well-validated ideas were selected for implementation and evaluation in a prototype. Five main themes of systems requirements emerged: (1) beyond expertise, successful collaborations require compatibility with respect to personality, work style, productivity, and many other factors (compatibility); (2) finding appropriate collaborators requires the ability to effectively search in domains other than your own using information that is comprehensive and descriptive (communication); (3) social networks are important for finding potential collaborators, assessing their suitability and compatibility, and establishing contact with them (intermediation); (4) information profiles must be complete, correct, up-to-date, and comprehensive and allow fine-grained control over access to information by different audiences (information quality and access); (5) keeping online profiles up-to-date should require little or no effort and be integrated into the scientist's existing workflow (motivation). Based on the requirements, 16 design ideas underwent formal validation with end users. Of those, three were chosen to be implemented and evaluated in a system prototype, "Digital|Vita": maintaining, formatting, and semi-automated updating of biographical information; searching for experts; and building and maintaining the social network and managing document flow. In addition to quantitative and factual information about potential collaborators, social connectedness, personal and professional compatibility, and power differentials also influence whether collaborations are formed. Current systems only partially model these requirements. Services in Digital|Vita combine an existing workflow, maintaining and formatting biographical information, with collaboration-searching functions in a novel way. Several barriers to the adoption of systems such as Digital|Vita exist, such as potential adoption asymmetries between junior and senior researchers and the tension between public and private information. Developers and researchers may consider one or more of the services described in this paper for implementation in their own expertise locating systems.

  14. Aerothermodynamic testing requirements for future space transportation systems

    NASA Technical Reports Server (NTRS)

    Paulson, John W., Jr.; Miller, Charles G., III

    1995-01-01

    Aerothermodynamics, encompassing aerodynamics, aeroheating, and fluid dynamic and physical processes, is the genesis for the design and development of advanced space transportation vehicles. It provides crucial information to other disciplines involved in the development process such as structures, materials, propulsion, and avionics. Sources of aerothermodynamic information include ground-based facilities, computational fluid dynamic (CFD) and engineering computer codes, and flight experiments. Utilization of this triad is required to provide the optimum requirements while reducing undue design conservatism, risk, and cost. This paper discusses the role of ground-based facilities in the design of future space transportation system concepts. Testing methodology is addressed, including the iterative approach often required for the assessment and optimization of configurations from an aerothermodynamic perspective. The influence of vehicle shape and the transition from parametric studies for optimization to benchmark studies for final design and establishment of the flight data book is discussed. Future aerothermodynamic testing requirements including the need for new facilities are also presented.

  15. Pilot-model analysis and simulation study of effect of control task desired control response

    NASA Technical Reports Server (NTRS)

    Adams, J. J.; Gera, J.; Jaudon, J. B.

    1978-01-01

    A pilot model analysis was performed that relates pilot control compensation, pilot aircraft system response, and aircraft response characteristics for longitudinal control. The results show that a higher aircraft short period frequency is required to achieve superior pilot aircraft system response in an altitude control task than is required in an attitude control task. These results were confirmed by a simulation study of target tracking. It was concluded that the pilot model analysis provides a theoretical basis for determining the effect of control task on pilot opinions.

  16. Radio broadcasting via satellite

    NASA Astrophysics Data System (ADS)

    Helm, Neil R.; Pritchard, Wilbur L.

    1990-10-01

    Market areas offering potential for future narrowband broadcast satellites are examined, including international public diplomacy, government- and advertising-supported, and business-application usages. Technical issues such as frequency allocation, spacecraft types, transmission parameters, and radio receiver characteristics are outlined. Service and system requirements, advertising revenue, and business communications services are among the economic issues discussed. The institutional framework required to provide an operational radio broadcast service is studied, and new initiatives in direct broadcast audio radio systems, encompassing studies, tests, in-orbit demonstrations of, and proposals for national and international commercial broadcast services are considered.

  17. Field evaluation of ventilation system performance in enclosed parking garages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayari, A.M.; Grot, D.A.; Krarti, M.

    2000-07-01

    This paper summarizes the results of a field study to determine the ventilation requirements and the contaminant levels in existing enclosed parking garages. The testing was conducted in seven parking garages with different sizes, traffic flow patterns, vehicle types, and locations. In particular, the study compares the actual ventilation rates measured using the tracer gas technique with the ventilation requirements of ANSI/ASHRAE Standard 62-1989. In addition, the field test evaluated the effectiveness of the existing ventilation systems in maintaining acceptable contaminant levels within enclosed parking garages.

  18. Spacecraft configuration study for second generation mobile satellite system

    NASA Technical Reports Server (NTRS)

    Louie, M.; Vonstentzsch, W.; Zanella, F.; Hayes, R.; Mcgovern, F.; Tyner, R.

    1985-01-01

    A high power, high performance communicatons satellite bus being developed is designed to satisfy a broad range of multimission payload requirements in a cost effective manner and is compatible with both STS and expendable launchers. Results are presented of tradeoff studies conducted to optimize the second generation mobile satellite system for its mass, power, and physical size. Investigations of the 20-meter antenna configuration, transponder linearization techniques, needed spacecraft modifications, and spacecraft power, dissipation, mass, and physical size indicate that the advanced spacecraft bus is capable of supporting the required payload for the satellite.

  19. Development of thermal control methods for specialized components and scientific instruments at very low temperatures (follow-on)

    NASA Technical Reports Server (NTRS)

    Wright, J. P.; Wilson, D. E.

    1976-01-01

    Many payloads currently proposed to be flown by the space shuttle system require long-duration cooling in the 3 to 200 K temperature range. Common requirements also exist for certain DOD payloads. Parametric design and optimization studies are reported for multistage and diode heat pipe radiator systems designed to operate in this temperature range. Also optimized are ground test systems for two long-life passive thermal control concepts operating under specified space environmental conditions. The ground test systems evaluated are ultimately intended to evolve into flight test qualification prototypes for early shuttle flights.

  20. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Current and Advanced Technology ACT control system definition tasks of the Integrated Application of Active Controls (IAAC) Technology project within the Energy Efficient Transport Program are summarized. The systems mechanize six active control functions: (1) pitch augmented stability; (2) angle of attack limiting; (3) lateral/directional augmented stability; (4) gust load alleviation; (5) maneuver load control; and (6) flutter mode control. The redundant digital control systems meet all function requirements with required reliability and declining weight and cost as advanced technology is introduced.

  1. Systems-level study of a nonsurvivable Jupiter turbopause probe. Volume 1: Summary

    NASA Technical Reports Server (NTRS)

    Wiltshire, R. S.

    1972-01-01

    The design of a space probe to explore the atmosphere of the planet Jupiter is discussed. Five major areas were considered: (1) definition of science requirements, (2) mission evaluation, (3) definition of probe system, (4) definition of spacecraft support requirements, and (5) nonequilibrium flow field analysis for communications blackout evaluation. The overall mission and system design are emphasized. The integration of the various technologies into complete systems designs is described. Results showed that a nonsurvivable turbopause probe mission to Jupiter with adequate data return to meet the science objectives is feasible and practical.

  2. Future Data Communication Architectures for Safety Critical Aircraft Cabin Systems

    NASA Astrophysics Data System (ADS)

    Berkhahn, Sven-Olaf

    2012-05-01

    The cabin of modern aircraft is subject to increasing demands for fast reconfiguration and hence flexibility. These demands require studies for new network architectures and technologies of the electronic cabin systems, which consider also weight and cost reductions as well as safety constraints. Two major approaches are in consideration to reduce the complex and heavy wiring harness: the usage of a so called hybrid data bus technology, which enables the common usage of the same data bus for several electronic cabin systems with different safety and security requirements and the application of wireless data transfer technologies for electronic cabin systems.

  3. Lunar Portable Life Support System Heat Rejection Study

    NASA Technical Reports Server (NTRS)

    Conger, Bruce; Sompayrac,Robert G.; Trevino, Luis A.; Bue, Grant C.

    2009-01-01

    Performing extravehicular activity (EVA) at various locations of the lunar surface presents thermal challenges that exceed those experienced in space flight to date. The lunar Portable Life Support System (PLSS) cooling unit must maintain thermal conditions within the space suit and reject heat loads generated by the crewmember and the PLSS equipment. The amount of cooling required varies based on the lunar location and terrain due to the heat transferred between the suit and its surroundings. A study has been completed which investigated the resources required to provide cooling under various lunar conditions, assuming three different thermal technology categories: 1. Spacesuit Water Membrane Evaporator (SWME) 2. Subcooled Phase Change Material (SPCM) 3. Radiators with and without heat pumps Results from the study are presented that show mass and power impacts on the cooling system as a function of the location and terrain on the lunar surface. Resources (cooling equipment mass and consumables) are greater at the equator and inside sunlit craters due to the additional heat loads on the cooling system. While radiator and SPCM technologies require minimal consumables, they come with carry-weight penalties and have limitations. A wider investigation is recommended to determine if these penalties and limitations are offset by the savings in consumables.

  4. Information Infrastructure, Information Environments, and Long-Term Collaboration

    NASA Astrophysics Data System (ADS)

    Baker, K. S.; Pennington, D. D.

    2009-12-01

    Information infrastructure that supports collaborative science is a complex system of people, organizational arrangements, and tools that require co-management. Contemporary studies are exploring how to establish and characterize effective collaborative information environments. Collaboration depends on the flow of information across the human and technical system components through mechanisms that create linkages, both conceptual and technical. This transcends the need for requirements solicitation and usability studies, highlighting synergistic interactions between humans and technology that can lead to emergence of group level cognitive properties. We consider the ramifications of placing priority on establishing new metaphors and new types of learning environments located near-to-data-origin for the field sciences. In addition to changes in terms of participant engagement, there are implications in terms of innovative contributions to the design of information systems and data exchange. While data integration occurs in the minds of individual participants, it may be facilitated by collaborative thinking and community infrastructure. Existing learning frameworks - from Maslow’s hierarchy of needs to organizational learning - require modification and extension if effective approaches to decentralized information management and systems design are to emerge. Case studies relating to data integration include ecological community projects: development of cross-disciplinary conceptual maps and of a community unit registry.

  5. Flexible Foam Protection Materials for Portable Life Support System Packaging Study

    NASA Technical Reports Server (NTRS)

    Tang,Henry H.; Dillon, Paul A.; Thomas, Gretchen A.

    2009-01-01

    This paper discusses the phase I effort in evaluating and selecting a light weight impact protection material for the Constellation Space Suit Element (CSSE) Portable Life Support System (PLSS) conceptual packaging study. A light weight material capable of holding and protecting the components inside the PLSS is required to demonstrate the viability of the flexible PLSS packaging concept. The material needs to distribute, dissipate, and absorb the impact energy of the PLSS falling on the lunar surface. It must also be robust to consistently perform over several Extravehicular Activity (EVA) missions in the extreme lunar thermal vacuum environment. This paper documents the performance requirements for selecting a foam protection material, and the methodologies for evaluating some commercial off-the-shelf (COTS) foam material candidates. It also presents the mechanical properties and impact drop tests results of the foam material candidates. The results of this study suggest that a foam based flexible protection system is a viable solution for PLSS packaging. However, additional works are needed to optimize COTS foam or to develop a composite foam system that will meet all the performance requirements for the CSSE PLSS flexible packaging.

  6. An information system for epidemiology based on a computer-based medical record.

    PubMed

    Verdier, C; Flory, A

    1994-12-01

    A new way is presented to build an information system addressed to problems in epidemiology. Based on our analysis of current and future requirements, a system is proposed which allows for collection, organization and distribution of data within a computer network. In this application, two broad communities of users-physicians and epidemiologists-can be identified, each with their own perspectives and goals. The different requirements of each community lead us to a client-service centered architecture which provides the functionality requirements of the two groups. The resulting physician workstation provides help for recording and querying medical information about patients and from a pharmacological database. All information is classified and coded in order to be retrieved for pharmaco-economic studies. The service center receives information from physician workstations and permits organizations that are in charge of statistical studies to work with "real" data recorded during patient encounters. This leads to a new approach in epidemiology. Studies can be carried out with a more efficient data acquisition. For modelling the information system, we use an object-oriented approach. We have observed that the object-oriented representation, particularly its concepts of generalization, aggregation and encapsulation, are very usable for our problem.

  7. Aviation Weather Information Communications Study (AWIN). Phase 1 and 2

    NASA Technical Reports Server (NTRS)

    Ball, J. W.; Herron, R. G.; Nozawa, E. T.; Thomas, E. A.; Witchey, R. D.

    2000-01-01

    This two part study examines the communication requirements to provide weather information in the cockpit as well as public and private communication systems available to address the requirements. Ongoing research projects combined with user needs for weather related information are used to identify and describe potential weather products that address decision support in three time frames: Far-Term Strategic, Near-Term Strategic and Tactical. Data requirements of these future products are identified and quantified. Communications systems and technologies available in the public as well as private sector are analyzed to identify potential solutions. Recommendations for further research identify cost, performance, and safety benefits to justify the investment. The study concludes that not all weather information has the same level of urgency to safety-of-flight and some information is more critical to one category of flight than another. Specific weather products need to be matched with communication systems with appropriate levels of reliability to support the criticality of the information. Available bandwidth for highly critical information should be preserved and dedicated to safety. Meanwhile, systems designed for in-flight-entertainment and other passenger/crew services could be used to support less critical information that is used only for planning and economic decision support.

  8. Proposing Electronic Health Record Usability Requirements Based on Enriched ISO 9241 Metric Usability Model

    PubMed Central

    Farzandipour, Mehrdad; Riazi, Hossein; Jabali, Monireh Sadeqi

    2018-01-01

    Introduction: System usability assessment is among the important aspects in assessing the quality of clinical information technology, especially when the end users of the system are concerned. This study aims at providing a comprehensive list of system usability. Methods: This research is a descriptive cross-sectional one conducted using Delphi technique in three phases in 2013. After experts’ ideas were concluded, the final version of the questionnaire including 163 items in three phases was presented to 40 users of information systems in hospitals. The grading ranged from 0-4. Data analysis was conducted using SPSS software. Those requirements with a mean point of three or higher were finally confirmed. Results: The list of system usability requirements for electronic health record was designed and confirmed in nine areas including suitability for the task (24 items), self-descriptiveness (22 items), controllability (19 questions), conformity with user expectations (25 items), error tolerance (21 items), suitability for individualization (7 items), suitability for learning (19 items), visual clarity (18 items) and auditory presentation (8 items). Conclusion: A relatively comprehensive model including useful requirements for using EHR was presented which can increase functionality, effectiveness and users’ satisfaction. Thus, it is suggested that the present model be adopted by system designers and healthcare system institutions to assess those systems. PMID:29719310

  9. The Pilot Training Study: A Cost-Estimating Model for Undergraduate Pilot Training.

    ERIC Educational Resources Information Center

    Allison, S. L.

    A means for estimating the resource requirements and attendant costs of any configuration of the undergraduate pilot training system (UPT) is described by inputs that are supplied by the user of the model. The inputs consist of data such as UPT graduate requirements, course syllabus requirements, instructor-student ratios, administrative and…

  10. Tug fleet and ground operations schedules and controls. Volume 2: part 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

  11. Feasibility study on sensor data fusion for the CP-140 aircraft: fusion architecture analyses

    NASA Astrophysics Data System (ADS)

    Shahbazian, Elisa

    1995-09-01

    Loral Canada completed (May 1995) a Department of National Defense (DND) Chief of Research and Development (CRAD) contract, to study the feasibility of implementing a multi- sensor data fusion (MSDF) system onboard the CP-140 Aurora aircraft. This system is expected to fuse data from: (a) attributed measurement oriented sensors (ESM, IFF, etc.); (b) imaging sensors (FLIR, SAR, etc.); (c) tracking sensors (radar, acoustics, etc.); (d) data from remote platforms (data links); and (e) non-sensor data (intelligence reports, environmental data, visual sightings, encyclopedic data, etc.). Based on purely theoretical considerations a central-level fusion architecture will lead to a higher performance fusion system. However, there are a number of systems and fusion architecture issues involving fusion of such dissimilar data: (1) the currently existing sensors are not designed to provide the type of data required by a fusion system; (2) the different types (attribute, imaging, tracking, etc.) of data may require different degree of processing, before they can be used within a fusion system efficiently; (3) the data quality from different sensors, and more importantly from remote platforms via the data links must be taken into account before fusing; and (4) the non-sensor data may impose specific requirements on the fusion architecture (e.g. variable weight/priority for the data from different sensors). This paper presents the analyses performed for the selection of the fusion architecture for the enhanced sensor suite planned for the CP-140 aircraft in the context of the mission requirements and environmental conditions.

  12. The Stryker Mobile Gun System: A Case Study on Managing Complexity

    DTIC Science & Technology

    2009-06-01

    In his article Managing Innovation in Complex Product Systems, Howard Rush (1997) identified three “hotspot” categories: 1) requirements... Managing innovation in complex product systems. The Institution for Electrical Engineers. Retrieved February 2, 2009, from http

  13. Maritime Navigation/Communications Program. Volume 2. Requirements Definitions Statement.

    DOT National Transportation Integrated Search

    1987-04-01

    A Maritime Administration/Transportation Systems Center team has been conducting a program to study navigation and communication systems on the Great Lakes and St. Lawrence River with the objective of defining technologies and systems that have the p...

  14. Simulation Models for the Electric Power Requirements in a Guideway Transit System

    DOT National Transportation Integrated Search

    1980-04-01

    This report describes a computer simulation model developed at the Transportation Systems Center to study the electrical power distribution characteristics of Automated Guideway Transit (AGT) systems. The objective of this simulation effort is to pro...

  15. Archival Information Management System.

    DTIC Science & Technology

    1995-02-01

    management system named Archival Information Management System (AIMS), designed to meet the audit trail requirement for studies completed under the...are to be archived to the extent that future reproducibility and interrogation of results will exist. This report presents a prototype information

  16. A management information system to study space diets

    NASA Technical Reports Server (NTRS)

    Kang, Sukwon; Both, A. J.; Janes, H. W. (Principal Investigator)

    2002-01-01

    A management information system (MIS), including a database management system (DBMS) and a decision support system (DSS), was developed to dynamically analyze the variable nutritional content of foods grown and prepared in an Advanced Life Support System (ALSS) such as required for long-duration space missions. The DBMS was designed around the known nutritional content of a list of candidate crops and their prepared foods. The DSS was designed to determine the composition of the daily crew diet based on crop and nutritional information stored in the DBMS. Each of the selected food items was assumed to be harvested from a yet-to-be designed ALSS biomass production subsystem and further prepared in accompanying food preparation subsystems. The developed DBMS allows for the analysis of the nutrient composition of a sample 20-day diet for future Advanced Life Support missions and is able to determine the required quantities of food needed to satisfy the crew's daily consumption. In addition, based on published crop growth rates, the DBMS was able to calculate the required size of the biomass production area needed to satisfy the daily food requirements for the crew. Results from this study can be used to help design future ALSS for which the integration of various subsystems (e.g., biomass production, food preparation and consumption, and waste processing) is paramount for the success of the mission.

  17. A management information system to study space diets.

    PubMed

    Kang, Sukwon; Both, A J

    2002-01-01

    A management information system (MIS), including a database management system (DBMS) and a decision support system (DSS), was developed to dynamically analyze the variable nutritional content of foods grown and prepared in an Advanced Life Support System (ALSS) such as required for long-duration space missions. The DBMS was designed around the known nutritional content of a list of candidate crops and their prepared foods. The DSS was designed to determine the composition of the daily crew diet based on crop and nutritional information stored in the DBMS. Each of the selected food items was assumed to be harvested from a yet-to-be designed ALSS biomass production subsystem and further prepared in accompanying food preparation subsystems. The developed DBMS allows for the analysis of the nutrient composition of a sample 20-day diet for future Advanced Life Support missions and is able to determine the required quantities of food needed to satisfy the crew's daily consumption. In addition, based on published crop growth rates, the DBMS was able to calculate the required size of the biomass production area needed to satisfy the daily food requirements for the crew. Results from this study can be used to help design future ALSS for which the integration of various subsystems (e.g., biomass production, food preparation and consumption, and waste processing) is paramount for the success of the mission.

  18. Systems Engineering Case Studies, Synopsis of the Learning Principles

    DTIC Science & Technology

    2009-08-24

    TBMCS refers to the Theater Battle Management Core System Systems Engineering Case Study Peacekeeper refers to the Peacekeeper Intercontinental...primary mirror defect going to orbit undetected in spite of substantial evidence that could have been used to prevent this occurrence. TBMCS /1...The requirements baseline was volatile up to system acceptance, which took place after TBMCS passed operational test and evaluation. Approved for

  19. Apollo/Skylab suit program-management systems study, volume 1

    NASA Technical Reports Server (NTRS)

    Mcniff, M.

    1974-01-01

    A management systems study for future spacesuit programs was conducted to assess past suit program requirements and management systems in addition to new and modified systems in order to identify the most cost effective methods for use during future spacesuit programs. The effort and its findings concerned the development and production of all hardware ranging from crew protective gear to total launch vehicles.

  20. Project Icarus: Preliminary Thoughts on the Selection of Probes and Instruments for an Icarus-style Interstellar Mission

    NASA Astrophysics Data System (ADS)

    Crawford, Ian A.

    2016-06-01

    In this paper we outline the range of probes and scientific instruments that will be required in order for Icarus to fulfill its scientific mission of exploring a nearby star, its attendant planetary system, and the intervening interstellar medium. Based on this preliminary analysis, we estimate that the minimum total Icarus scientific payload mass (i.e. the mass of probes and instruments which must be decelerated to rest in the target system to enable a meaningful programme of scientific investigation) will be in the region of 100 tonnes. Of this, approximately 10 tonnes would be allocated for cruise-phase science instruments, and about 35 tonnes (i.e. the average of estimated lower and upper limits of 28 and 41 tonnes) would be contributed by the intra-system science payload itself (i.e. the dry mass of the stellar and planetary probes and their instruments). The remaining ~55 tonnes is allocated for the sub-probe intra-system propulsion requirements (crudely estimated from current Solar System missions; detailed modelling of sub-probe propulsion systems will be needed to refine this figure). The overall mass contributed by the science payload to the total that must be decelerated from the interstellar cruise velocity will be considerably more than 100 tonnes, however, as allowance must be made for the payload structural and infrastructural elements required to support, deploy, and communicate with the science probes and instruments. Based on the earlier Daedalus study, we estimate another factor of two to allow for these components. Pending the outcome of more detailed studies, it therefore appears that an overall science-related payload mass of ~200 tonnes will be required. This paper is a submission of the Project Icarus Study Group.

Top