Sample records for system resource management

  1. Resource Management for Distributed Parallel Systems

    NASA Technical Reports Server (NTRS)

    Neuman, B. Clifford; Rao, Santosh

    1993-01-01

    Multiprocessor systems should exist in the the larger context of distributed systems, allowing multiprocessor resources to be shared by those that need them. Unfortunately, typical multiprocessor resource management techniques do not scale to large networks. The Prospero Resource Manager (PRM) is a scalable resource allocation system that supports the allocation of processing resources in large networks and multiprocessor systems. To manage resources in such distributed parallel systems, PRM employs three types of managers: system managers, job managers, and node managers. There exist multiple independent instances of each type of manager, reducing bottlenecks. The complexity of each manager is further reduced because each is designed to utilize information at an appropriate level of abstraction.

  2. A system management methodology for building successful resource management systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1989-01-01

    This paper presents a system management methodology for building successful resource management systems that possess lifecycle effectiveness. This methodology is based on an analysis of the traditional practice of Systems Engineering Management as it applies to the development of resource management systems. The analysis produced fifteen significant findings presented as recommended adaptations to the traditional practice of Systems Engineering Management to accommodate system development when the requirements are incomplete, unquantifiable, ambiguous and dynamic. Ten recommended adaptations to achieve operational effectiveness when requirements are incomplete, unquantifiable or ambiguous are presented and discussed. Five recommended adaptations to achieve system extensibility when requirements are dynamic are also presented and discussed. The authors conclude that the recommended adaptations to the traditional practice of Systems Engineering Management should be implemented for future resource management systems and that the technology exists to build these systems extensibly.

  3. The Resource Manager the ATLAS Trigger and Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Aleksandrov, I.; Avolio, G.; Lehmann Miotto, G.; Soloviev, I.

    2017-10-01

    The Resource Manager is one of the core components of the Data Acquisition system of the ATLAS experiment at the LHC. The Resource Manager marshals the right for applications to access resources which may exist in multiple but limited copies, in order to avoid conflicts due to program faults or operator errors. The access to resources is managed in a manner similar to what a lock manager would do in other software systems. All the available resources and their association to software processes are described in the Data Acquisition configuration database. The Resource Manager is queried about the availability of resources every time an application needs to be started. The Resource Manager’s design is based on a client-server model, hence it consists of two components: the Resource Manager “server” application and the “client” shared library. The Resource Manager server implements all the needed functionalities, while the Resource Manager client library provides remote access to the “server” (i.e., to allocate and free resources, to query about the status of resources). During the LHC’s Long Shutdown period, the Resource Manager’s requirements have been reviewed at the light of the experience gained during the LHC’s Run 1. As a consequence, the Resource Manager has undergone a full re-design and re-implementation cycle with the result of a reduction of the code base by 40% with respect to the previous implementation. This contribution will focus on the way the design and the implementation of the Resource Manager could leverage the new features available in the C++11 standard, and how the introduction of external libraries (like Boost multi-container) led to a more maintainable system. Additionally, particular attention will be given to the technical solutions adopted to ensure the Resource Manager could effort the typical requests rates of the Data Acquisition system, which is about 30000 requests in a time window of few seconds coming from more than 1000 clients.

  4. A Case Study of the United States Navy’s Enterprise Resource Planning System

    DTIC Science & Technology

    2006-06-01

    incarnations, MRP-II added the capabilities of shop-floor management and distribution management activities. Later versions included the ability to manage ... finances , human resources, engineering, and project management. Enterprise Resource Planning systems were then developed as an integrated system

  5. Data systems can boost nursing care. Nurse management information systems in resource management.

    PubMed

    Wilson, J

    1992-02-01

    Resource management aims to improve patient care by matching resources with patient needs. Nurse management information systems provide data on skill mix, rostering requirements, ward costs and patient dependency levels, enabling a nursing strategy to be planned for the ward.

  6. 106-17 Telemetry Management Resources Chapter 25

    DTIC Science & Technology

    2017-07-01

    aspects of the TmNS system . There are two primary protocols for accessing the management resources: Simple Network Management Protocol (SNMP) and... management resources as well as a basic HTTP clients and servers for a more RESTful approach to system management . Both tools are available from the...Telemetry Standards, RCC Standard 106-17 Chapter 25, July 2017 i CHAPTER 25 Management Resources Acronyms

  7. Research on elastic resource management for multi-queue under cloud computing environment

    NASA Astrophysics Data System (ADS)

    CHENG, Zhenjing; LI, Haibo; HUANG, Qiulan; Cheng, Yaodong; CHEN, Gang

    2017-10-01

    As a new approach to manage computing resource, virtualization technology is more and more widely applied in the high-energy physics field. A virtual computing cluster based on Openstack was built at IHEP, using HTCondor as the job queue management system. In a traditional static cluster, a fixed number of virtual machines are pre-allocated to the job queue of different experiments. However this method cannot be well adapted to the volatility of computing resource requirements. To solve this problem, an elastic computing resource management system under cloud computing environment has been designed. This system performs unified management of virtual computing nodes on the basis of job queue in HTCondor based on dual resource thresholds as well as the quota service. A two-stage pool is designed to improve the efficiency of resource pool expansion. This paper will present several use cases of the elastic resource management system in IHEPCloud. The practical run shows virtual computing resource dynamically expanded or shrunk while computing requirements change. Additionally, the CPU utilization ratio of computing resource was significantly increased when compared with traditional resource management. The system also has good performance when there are multiple condor schedulers and multiple job queues.

  8. A systems engineering management approach to resource management applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  9. Resource, quality and safety management.

    PubMed

    Hovenga, Evelyn J S

    2010-01-01

    This chapter gives an educational overview of: * Resource management relative to sustainability and the use casemix systems * Types of resources and their information system needs to support their optimal management * Quality, performance measurement options and associated information needs * Casemix systems' characteristics, usage and need for enterprise systems.

  10. Electronic Resource Management 2.0: Using Web 2.0 Technologies as Cost-Effective Alternatives to an Electronic Resource Management System

    ERIC Educational Resources Information Center

    Murray, Adam

    2008-01-01

    Designed to assist with the management of e-resources, electronic resource management (ERM) systems are time- and fund-consuming to purchase and maintain. Questions of system compatibility, data population, and workflow design/redesign can be difficult to answer; sometimes those answers are not what we'd prefer to hear. The two primary functions…

  11. Water Resources Management and Hydrologic Design Under Uncertain Climate Change Scenarios

    NASA Astrophysics Data System (ADS)

    Teegavarapu, R. S.

    2008-05-01

    The impact of climate change on hydrologic design and management of water resource systems could be one of the important challenges faced by future practicing hydrologists and water resources managers. Many water resources managers currently rely on the historical hydrological data and adaptive real-time operations without consideration of the impact of climate change on major inputs influencing the behavior of hydrologic systems and the operating rules. Issues such as risk, reliability and robustness of water resources systems under different climate change scenarios were addressed in the past. However, water resources management with the decision maker's preferences attached to climate change has never been dealt with. This presentation discusses issues related to impacts of climate change on water resources management and application of a soft-computing approach, fuzzy set theory, for climate-sensitive management of water resources systems. A real-life case study example is presented to illustrate the applicability of soft-computing approach for handling the decision maker's preferences in accepting or rejecting the magnitude and direction of climate change.

  12. 44 CFR 208.6 - System resource reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false System resource reports. 208.6 Section 208.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE NATIONAL URBAN SEARCH AND RESCUE RESPONSE SYSTEM General § 208.6 System resource reports. (a) Reports to...

  13. 5 CFR 9701.410 - DHS responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.410 DHS responsibilities. In carrying out its performance management system(s), DHS must— (a) Transfer ratings between subordinate organizations and to... 9701.410 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM...

  14. 5 CFR 9701.410 - DHS responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.410 DHS responsibilities. In carrying out its performance management system(s), DHS must— (a) Transfer ratings between subordinate organizations and to... 9701.410 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM...

  15. 5 CFR 9701.410 - DHS responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.410 DHS responsibilities. In carrying out its performance management system(s), DHS must— (a) Transfer ratings between subordinate organizations and to... 9701.410 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM...

  16. 5 CFR 9701.405 - Performance management system requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements. 9701.405 Section 9701.405 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.405 Performance...

  17. Bringing Technology to the Resource Manager ... and Not the Reverse

    Treesearch

    Daniel L. Schmoldt

    1992-01-01

    Many natural resource managers envision their jobs as pressed between the resources that they have a mandate to manage and the technological aides that are essential tools to conduct those management activities. On the one hand, managers are straining to understand an extremely complex array of natural systems and the management pressures placed on those systems. Then...

  18. Total Water Management, the New Paradigm for Urban Water Systems

    EPA Science Inventory

    There is a growing need for urban water managers to take a more holistic view of their water resource systems as population growth, urbanization, and current resource management practices put different stresses on local water resources and urban infrastructure. Total Water Manag...

  19. The research and development of water resources management information system based on ArcGIS

    NASA Astrophysics Data System (ADS)

    Cui, Weiqun; Gao, Xiaoli; Li, Yuzhi; Cui, Zhencai

    According to that there are large amount of data, complexity of data type and format in the water resources management, we built the water resources calculation model and established the water resources management information system based on the advanced ArcGIS and Visual Studio.NET development platform. The system can integrate the spatial data and attribute data organically, and manage them uniformly. It can analyze spatial data, inquire by map and data bidirectionally, provide various charts and report forms automatically, link multimedia information, manage database etc. . So it can provide spatial and static synthetical information services for study, management and decision of water resources, regional geology and eco-environment etc..

  20. 5 CFR 9701.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES... establishment of a new human resources management system within the Department of Homeland Security (DHS), as...

  1. 5 CFR 9701.512 - Conferring on procedures for the exercise of management rights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.512...

  2. Water resources management in a homogenizing world: Averting the Growth and Underinvestment trajectory

    NASA Astrophysics Data System (ADS)

    Mirchi, Ali; Watkins, David W.; Huckins, Casey J.; Madani, Kaveh; Hjorth, Peder

    2014-09-01

    Biotic homogenization, a de facto symptom of a global biodiversity crisis, underscores the urgency of reforming water resources management to focus on the health and viability of ecosystems. Global population and economic growth, coupled with inadequate investment in maintenance of ecological systems, threaten to degrade environmental integrity and ecosystem services that support the global socioeconomic system, indicative of a system governed by the Growth and Underinvestment (G&U) archetype. Water resources management is linked to biotic homogenization and degradation of system integrity through alteration of water systems, ecosystem dynamics, and composition of the biota. Consistent with the G&U archetype, water resources planning primarily treats ecological considerations as exogenous constraints rather than integral, dynamic, and responsive parts of the system. It is essential that the ecological considerations be made objectives of water resources development plans to facilitate the analysis of feedbacks and potential trade-offs between socioeconomic gains and ecological losses. We call for expediting a shift to ecosystem-based management of water resources, which requires a better understanding of the dynamics and links between water resources management actions, ecological side-effects, and associated long-term ramifications for sustainability. To address existing knowledge gaps, models that include dynamics and estimated thresholds for regime shifts or ecosystem degradation need to be developed. Policy levers for implementation of ecosystem-based water resources management include shifting away from growth-oriented supply management, better demand management, increased public awareness, and institutional reform that promotes adaptive and transdisciplinary management approaches.

  3. 5 CFR 9701.408 - Developing performance and addressing poor performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.408...

  4. The importance of human resources management in health care: a global context.

    PubMed

    Kabene, Stefane M; Orchard, Carole; Howard, John M; Soriano, Mark A; Leduc, Raymond

    2006-07-27

    This paper addresses the health care system from a global perspective and the importance of human resources management (HRM) in improving overall patient health outcomes and delivery of health care services. We explored the published literature and collected data through secondary sources. Various key success factors emerge that clearly affect health care practices and human resources management. This paper will reveal how human resources management is essential to any health care system and how it can improve health care models. Challenges in the health care systems in Canada, the United States of America and various developing countries are examined, with suggestions for ways to overcome these problems through the proper implementation of human resources management practices. Comparing and contrasting selected countries allowed a deeper understanding of the practical and crucial role of human resources management in health care. Proper management of human resources is critical in providing a high quality of health care. A refocus on human resources management in health care and more research are needed to develop new policies. Effective human resources management strategies are greatly needed to achieve better outcomes from and access to health care around the world.

  5. The importance of human resources management in health care: a global context

    PubMed Central

    Kabene, Stefane M; Orchard, Carole; Howard, John M; Soriano, Mark A; Leduc, Raymond

    2006-01-01

    Background This paper addresses the health care system from a global perspective and the importance of human resources management (HRM) in improving overall patient health outcomes and delivery of health care services. Methods We explored the published literature and collected data through secondary sources. Results Various key success factors emerge that clearly affect health care practices and human resources management. This paper will reveal how human resources management is essential to any health care system and how it can improve health care models. Challenges in the health care systems in Canada, the United States of America and various developing countries are examined, with suggestions for ways to overcome these problems through the proper implementation of human resources management practices. Comparing and contrasting selected countries allowed a deeper understanding of the practical and crucial role of human resources management in health care. Conclusion Proper management of human resources is critical in providing a high quality of health care. A refocus on human resources management in health care and more research are needed to develop new policies. Effective human resources management strategies are greatly needed to achieve better outcomes from and access to health care around the world. PMID:16872531

  6. 76 FR 76956 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... location: Delete entry and replace with ``Human Resources Directorate, Labor and Management Employee...: Reasonable Accommodation Program Records. System location: Human Resources Directorate, Labor and Management..., Labor and Management Employee Relations Division, Human Resources Directorate, Washington Headquarters...

  7. 5 CFR 9701.231 - Conversion of positions and employees to the DHS classification system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Transitional...

  8. 5 CFR 9701.526 - Continuation of existing laws, recognitions, agreements, and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations...

  9. Energy-aware Thread and Data Management in Heterogeneous Multi-core, Multi-memory Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Su, Chun-Yi

    By 2004, microprocessor design focused on multicore scaling—increasing the number of cores per die in each generation—as the primary strategy for improving performance. These multicore processors typically equip multiple memory subsystems to improve data throughput. In addition, these systems employ heterogeneous processors such as GPUs and heterogeneous memories like non-volatile memory to improve performance, capacity, and energy efficiency. With the increasing volume of hardware resources and system complexity caused by heterogeneity, future systems will require intelligent ways to manage hardware resources. Early research to improve performance and energy efficiency on heterogeneous, multi-core, multi-memory systems focused on tuning a single primitivemore » or at best a few primitives in the systems. The key limitation of past efforts is their lack of a holistic approach to resource management that balances the tradeoff between performance and energy consumption. In addition, the shift from simple, homogeneous systems to these heterogeneous, multicore, multi-memory systems requires in-depth understanding of efficient resource management for scalable execution, including new models that capture the interchange between performance and energy, smarter resource management strategies, and novel low-level performance/energy tuning primitives and runtime systems. Tuning an application to control available resources efficiently has become a daunting challenge; managing resources in automation is still a dark art since the tradeoffs among programming, energy, and performance remain insufficiently understood. In this dissertation, I have developed theories, models, and resource management techniques to enable energy-efficient execution of parallel applications through thread and data management in these heterogeneous multi-core, multi-memory systems. I study the effect of dynamic concurrent throttling on the performance and energy of multi-core, non-uniform memory access (NUMA) systems. I use critical path analysis to quantify memory contention in the NUMA memory system and determine thread mappings. In addition, I implement a runtime system that combines concurrent throttling and a novel thread mapping algorithm to manage thread resources and improve energy efficient execution in multi-core, NUMA systems.« less

  10. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 5: Detailed system requirements: Two case studies

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Major resource management missions to be performed by the TERSSE are examined in order to develop an understanding of the form and function of a system designed to perform an operational mission. Factors discussed include: resource manager (user) functions, methods of performing their function, the information flows and information requirements embodied in their function, and the characteristics of the observation system which assists in the management of the resource involved. The missions selected for study are: world crop survey and land resources management. These missions are found to represent opposite ends of the TERSSE spectrum and to support the conclusion that different missions require different systems and must be analyzed in detail to permit proper system development decisions.

  11. Challenges to managing natural resource information

    Treesearch

    William L. Halvorson

    2005-01-01

    One of the most important issues facing resource managers today is that of information. In order to handle the numerous and diverse requirements for information, landscape-scale information management systems are needed that allow individual land management units to view their resource information in a regional context. The characteristics of such a system are: (1) the...

  12. 5 CFR 9701.510 - Powers and duties of the Federal Labor Relations Authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.510...

  13. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  14. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  15. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  16. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  17. 48 CFR 1511.011-79 - Information resources management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...

  18. Complex ambulatory settings demand scheduling systems.

    PubMed

    Ross, K M

    1998-01-01

    Practice management systems are becoming more and more complex, as they are asked to integrate all aspects of patient and resource management. Although patient scheduling is a standard expectation in any ambulatory environment, facilities and equipment resource scheduling are additional functionalities of scheduling systems. Because these functions were not typically managed in manual patient scheduling, often the result was resource mismanagement, along with a potential negative impact on utilization, patient flow and provider productivity. As ambulatory organizations have become more seasoned users of practice management software, the value of resource scheduling has become apparent. Appointment scheduling within a fully integrated practice management system is recognized as an enhancement of scheduling itself and provides additional tools to manage other information needs. Scheduling, as one component of patient information management, provides additional tools in these areas.

  19. Evidence-based human resource management: a study of nurse leaders' resource allocation.

    PubMed

    Fagerström, Lisbeth

    2009-05-01

    The aims were to illustrate how the RAFAELA system can be used to facilitate evidence-based human resource management. The theoretical framework of the RAFAELA system is based on a holistic view of humankind and a view of leadership founded on human resource management. Nine wards from three central hospitals in Finland participated in the study. The data, stemming from 2006-2007, were taken from the critical indicators (ward-related and nursing intensity information) for national benchmarking used in the RAFAELA system. The data were analysed descriptively. The daily nursing resources per classified patient ratio is a more specific method of measurement than the nurse-to-patient ratio. For four wards, the nursing intensity per nurse surpassed the optimal level 34% to 62.2% of days. Resource allocation was clearly improved in that a better balance between patients' care needs and available nursing resources was maintained. The RAFAELA system provides a rational, systematic and objective foundation for evidence-based human resource management. Data from a systematic use of the RAFAELA system offer objective facts and motives for evidence-based decision making in human resource management, and will therefore enhance the nurse leaders' evidence and scientific based way of working.

  20. [Evaluation of the performance of the logistics management system of malaria control resources in the Littoral Department, Benin, in 2017].

    PubMed

    Ouro-Koura, Abdou-Rahim; Sopoh, Emmanuel Ghislain; Sossa, Jerôme Charles; Glèlè-Ahanhanzo, Yolaine; Agueh, Victoire; Ouendo, Edgard-Marius; Ouedraogo, Laurent

    2018-01-01

    This study aimed to evaluate the performance of the logistics management system (LMS) of malaria control (MC) resources in the Littoral Department, Benin, in 2017. In June 2017, we conducted a cross-sectional evaluative study focusing on the structures for the storage and the disposal of MC resources as well as on staff involved in their management. The performance of the the logistics management system was evaluated on the basis of the observed compliance of the components and sub-components of the "Structure", the "Process" and the "Results" with the norms and standards defined by the Ministry of Health. A total of 36 structures were investigated and secondary target was surveyed. It followed that 52,78% of the structures for the storage and the disposal of MC resources met the requirements for resources storage while only 33.33% of MC resources management staff were trained in logistics management. The performance of the logistics management system of MC resources was inadequate (compliance 59,13 % compared to the expected score). The structure, as well as the process were non-compliant with the standards ( 60,20% and 73.22% compared to the expected score respectively), leading to negative results (41.53% compared to the expected score). The most inadequate sub-component was the logistics management information system (LMIS). This study highlights the role of LMS for better performance of MC resources management. Particular attention should be given to this component.

  1. 5 CFR 9701.222 - Reconsideration of classification decisions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...

  2. 5 CFR 9701.222 - Reconsideration of classification decisions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...

  3. 5 CFR 9701.222 - Reconsideration of classification decisions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...

  4. 5 CFR 9701.222 - Reconsideration of classification decisions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...

  5. Proceedings of the Printing Resources Management Information Systems Cost and Financial Workshop (1st), held 28-29 October 1982, Washington, DC.

    DTIC Science & Technology

    1982-12-01

    FIRST PRINTING RESOURCES Final - MANAGEMENT INFORMATION SYSTEM (PRMIS) COST AND FINANCIAL WORKSHOP 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(@) I...NPPS). Cost and Financial (C&F) is a subsystem of the proposed second Printing Resources Management Information System (PRMIS II). The objectives of the

  6. Management advisory memorandum on resource requirement planning for operating and maintaining the National Airspace System

    DOT National Transportation Integrated Search

    1997-01-13

    Management Advisory Memorandum on Resource Requirement Planning for Operating and Maintaining the National Airspace System (NAS) in the Federal Aviation Administration (FAA). Evaluates FAA's resource requirement planning system to ensure it accuratel...

  7. A resource management architecture based on complex network theory in cloud computing federation

    NASA Astrophysics Data System (ADS)

    Zhang, Zehua; Zhang, Xuejie

    2011-10-01

    Cloud Computing Federation is a main trend of Cloud Computing. Resource Management has significant effect on the design, realization, and efficiency of Cloud Computing Federation. Cloud Computing Federation has the typical characteristic of the Complex System, therefore, we propose a resource management architecture based on complex network theory for Cloud Computing Federation (abbreviated as RMABC) in this paper, with the detailed design of the resource discovery and resource announcement mechanisms. Compare with the existing resource management mechanisms in distributed computing systems, a Task Manager in RMABC can use the historical information and current state data get from other Task Managers for the evolution of the complex network which is composed of Task Managers, thus has the advantages in resource discovery speed, fault tolerance and adaptive ability. The result of the model experiment confirmed the advantage of RMABC in resource discovery performance.

  8. Implementing CORAL: An Electronic Resource Management System

    ERIC Educational Resources Information Center

    Whitfield, Sharon

    2011-01-01

    A 2010 electronic resource management survey conducted by Maria Collins of North Carolina State University and Jill E. Grogg of University of Alabama Libraries found that the top six electronic resources management priorities included workflow management, communications management, license management, statistics management, administrative…

  9. Classification systems for natural resource management

    USGS Publications Warehouse

    Kleckner, Richard L.

    1981-01-01

    Resource managers employ various types of resource classification systems in their management activities such as inventory, mapping, and data analysis. Classification is the ordering or arranging of objects into groups or sets on the basis of their relationships, and as such, provide the resource managers with a structure for organizing their needed information. In addition of conforming to certain logical principles, resource classifications should be flexible, widely applicable to a variety of environmental conditions, and useable with minimal training. The process of classification may be approached from the bottom up (aggregation) or the top down (subdivision) or a combination of both, depending on the purpose of the classification. Most resource classification systems in use today focus on a single resource and are used for a single, limited purpose. However, resource managers now must employ the concept of multiple use in their management activities. What they need is an integrated, ecologically based approach to resource classification which would fulfill multiple-use mandates. In an effort to achieve resource-data compatibility and data sharing among Federal agencies, and interagency agreement has been signed by five Federal agencies to coordinate and cooperate in the area of resource classification and inventory.

  10. On the development of an interactive resource information management system for analysis and display of spatiotemporal data

    NASA Technical Reports Server (NTRS)

    Schell, J. A.

    1974-01-01

    The recent availability of timely synoptic earth imagery from the Earth Resources Technology Satellites (ERTS) provides a wealth of information for the monitoring and management of vital natural resources. Formal language definitions and syntax interpretation algorithms were adapted to provide a flexible, computer information system for the maintenance of resource interpretation of imagery. These techniques are incorporated, together with image analysis functions, into an Interactive Resource Information Management and Analysis System, IRIMAS, which is implemented on a Texas Instruments 980A minicomputer system augmented with a dynamic color display for image presentation. A demonstration of system usage and recommendations for further system development are also included.

  11. Automatic Management of Parallel and Distributed System Resources

    NASA Technical Reports Server (NTRS)

    Yan, Jerry; Ngai, Tin Fook; Lundstrom, Stephen F.

    1990-01-01

    Viewgraphs on automatic management of parallel and distributed system resources are presented. Topics covered include: parallel applications; intelligent management of multiprocessing systems; performance evaluation of parallel architecture; dynamic concurrent programs; compiler-directed system approach; lattice gaseous cellular automata; and sparse matrix Cholesky factorization.

  12. 5 CFR 9701.373 - Conversion of employees to the DHS pay system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... system. 9701.373 Section 9701.373 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Transitional Provisions...

  13. Government information resource catalog and its service system realization

    NASA Astrophysics Data System (ADS)

    Gui, Sheng; Li, Lin; Wang, Hong; Peng, Zifeng

    2007-06-01

    During the process of informatization, there produces a great deal of information resources. In order to manage these information resources and use them to serve the management of business, government decision and public life, it is necessary to establish a transparent and dynamic information resource catalog and its service system. This paper takes the land-house management information resource for example. Aim at the characteristics of this kind of information, this paper does classification, identification and description of land-house information in an uniform specification and method, establishes land-house information resource catalog classification system&, metadata standard, identification standard and land-house thematic thesaurus, and in the internet environment, user can search and get their interested information conveniently. Moreover, under the network environment, to achieve speedy positioning, inquiring, exploring and acquiring various types of land-house management information; and satisfy the needs of sharing, exchanging, application and maintenance of land-house management information resources.

  14. Resource Management in Constrained Dynamic Situations

    NASA Astrophysics Data System (ADS)

    Seok, Jinwoo

    Resource management is considered in this dissertation for systems with limited resources, possibly combined with other system constraints, in unpredictably dynamic environments. Resources may represent fuel, power, capabilities, energy, and so on. Resource management is important for many practical systems; usually, resources are limited, and their use must be optimized. Furthermore, systems are often constrained, and constraints must be satisfied for safe operation. Simplistic resource management can result in poor use of resources and failure of the system. Furthermore, many real-world situations involve dynamic environments. Many traditional problems are formulated based on the assumptions of given probabilities or perfect knowledge of future events. However, in many cases, the future is completely unknown, and information on or probabilities about future events are not available. In other words, we operate in unpredictably dynamic situations. Thus, a method is needed to handle dynamic situations without knowledge of the future, but few formal methods have been developed to address them. Thus, the goal is to design resource management methods for constrained systems, with limited resources, in unpredictably dynamic environments. To this end, resource management is organized hierarchically into two levels: 1) planning, and 2) control. In the planning level, the set of tasks to be performed is scheduled based on limited resources to maximize resource usage in unpredictably dynamic environments. In the control level, the system controller is designed to follow the schedule by considering all the system constraints for safe and efficient operation. Consequently, this dissertation is mainly divided into two parts: 1) planning level design, based on finite state machines, and 2) control level methods, based on model predictive control. We define a recomposable restricted finite state machine to handle limited resource situations and unpredictably dynamic environments for the planning level. To obtain a policy, dynamic programing is applied, and to obtain a solution, limited breadth-first search is applied to the recomposable restricted finite state machine. A multi-function phased array radar resource management problem and an unmanned aerial vehicle patrolling problem are treated using recomposable restricted finite state machines. Then, we use model predictive control for the control level, because it allows constraint handling and setpoint tracking for the schedule. An aircraft power system management problem is treated that aims to develop an integrated control system for an aircraft gas turbine engine and electrical power system using rate-based model predictive control. Our results indicate that at the planning level, limited breadth-first search for recomposable restricted finite state machines generates good scheduling solutions in limited resource situations and unpredictably dynamic environments. The importance of cooperation in the planning level is also verified. At the control level, a rate-based model predictive controller allows good schedule tracking and safe operations. The importance of considering the system constraints and interactions between the subsystems is indicated. For the best resource management in constrained dynamic situations, the planning level and the control level need to be considered together.

  15. [Design and implementation of information management system for Chinese materia medica resources survey].

    PubMed

    Wang, Hui; Zhang, Xiao-Bo; Ge, Xiao-Guang; Jin, Yan; Jing, Zhi-Xian; Wang, Ling; Zhao, Yu-Ping; Guo, Lan-Ping; Huang, Lu-Qi

    2017-11-01

    By means of the established Information Management System for Chinese materia medica resources survey, the national, provincial and county level organization, personnel and the implementation of the program of Chinese materia medica resources survey, and the survey team of medicinal plant investigation, photos, Chinese herbal medicine market survey, the traditional Chinese materia medica resources knowledge survey, germplasm resources investigation and the data collation and summary specimen have been realised. Throughout the whole working process of the fourth national Chinese materia medica resources survey, it is ensured that all data were no missing, no repeat, and well stored and managed. The Information Management System can improve the standardization degree of Chinese materia medica resources survey, and maintain the continuity. Copyright© by the Chinese Pharmaceutical Association.

  16. 5 CFR 9701.527 - Savings provision.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....527 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.527 Savings provision. This subpart does not...

  17. 5 CFR 9701.516 - Allotments to representatives.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 9701.516 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.516 Allotments to representatives...

  18. 5 CFR 9701.516 - Allotments to representatives.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 9701.516 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.516 Allotments to representatives...

  19. 5 CFR 9701.516 - Allotments to representatives.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 9701.516 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.516 Allotments to representatives...

  20. 5 CFR 9701.516 - Allotments to representatives.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 9701.516 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.516 Allotments to representatives...

  1. 5 CFR 9701.523 - Official time.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.523 Official time. (a) Any employee representing an...

  2. 5 CFR 9701.527 - Savings provision.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....527 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.527 Savings provision. This subpart does not...

  3. 5 CFR 9701.401 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.401 Purpose. (a) This subpart provides for the establishment...

  4. 5 CFR 9701.410 - DHS responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.410 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.410 DHS responsibilities. In carrying out its...

  5. 5 CFR 9701.507 - Employee rights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....507 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.507 Employee rights. Each employee has the...

  6. Progress and challenges to the global waste management system.

    PubMed

    Singh, Jagdeep; Laurenti, Rafael; Sinha, Rajib; Frostell, Björn

    2014-09-01

    Rapid economic growth, urbanization and increasing population have caused (materially intensive) resource consumption to increase, and consequently the release of large amounts of waste to the environment. From a global perspective, current waste and resource management lacks a holistic approach covering the whole chain of product design, raw material extraction, production, consumption, recycling and waste management. In this article, progress and different sustainability challenges facing the global waste management system are presented and discussed. The study leads to the conclusion that the current, rather isolated efforts, in different systems for waste management, waste reduction and resource management are indeed not sufficient in a long term sustainability perspective. In the future, to manage resources and wastes sustainably, waste management requires a more systems-oriented approach that addresses the root causes for the problems. A specific issue to address is the development of improved feedback information (statistics) on how waste generation is linked to consumption. © The Author(s) 2014.

  7. 5 CFR 9701.314 - DHS responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.314 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Overview of Pay System § 9701.314 DHS...

  8. Total Water Management: The New Paradigm for Urban Water Resources Planning

    EPA Science Inventory

    There is a growing need for urban water managers to take a more holistic view of their water resource systems as population growth, urbanization, and current resource management practices put different stresses on local water resources and urban infrastructure. Total Water Manag...

  9. 5 CFR 9701.522 - Exceptions to arbitration awards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....522 Section 9701.522 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.522 Exceptions to arbitration...

  10. 5 CFR 9701.502 - Rule of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.502 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.502 Rule of construction. In interpreting this...

  11. 5 CFR 9701.517 - Unfair labor practices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.517 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.517 Unfair labor practices. (a) For the...

  12. 5 CFR 9701.407 - Monitoring performance and providing feedback.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... feedback. 9701.407 Section 9701.407 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.407 Monitoring...

  13. The dual impact of ecology and management on social incentives in marine common-pool resource systems.

    PubMed

    Klein, E S; Barbier, M R; Watson, J R

    2017-08-01

    Understanding how and when cooperative human behaviour forms in common-pool resource systems is critical to illuminating social-ecological systems and designing governance institutions that promote sustainable resource use. Before assessing the full complexity of social dynamics, it is essential to understand, concretely and mechanistically, how resource dynamics and human actions interact to create incentives and pay-offs for social behaviours. Here, we investigated how such incentives for information sharing are affected by spatial dynamics and management in a common-pool resource system. Using interviews with fishermen to inform an agent-based model, we reveal generic mechanisms through which, for a given ecological setting characterized by the spatial dynamics of the resource, the two 'human factors' of information sharing and management may heterogeneously impact various members of a group for whom theory would otherwise predict the same strategy. When users can deplete the resource, these interactions are further affected by the management approach. Finally, we discuss the implications of alternative motivations, such as equity among fishermen and consistency of the fleet's output. Our results indicate that resource spatial dynamics, form of management and level of depletion can interact to alter the sociality of people in common-pool resource systems, providing necessary insight for future study of strategic decision processes.

  14. Review of dynamic optimization methods in renewable natural resource management

    USGS Publications Warehouse

    Williams, B.K.

    1989-01-01

    In recent years, the applications of dynamic optimization procedures in natural resource management have proliferated. A systematic review of these applications is given in terms of a number of optimization methodologies and natural resource systems. The applicability of the methods to renewable natural resource systems are compared in terms of system complexity, system size, and precision of the optimal solutions. Recommendations are made concerning the appropriate methods for certain kinds of biological resource problems.

  15. 5 CFR 9701.334 - Setting and adjusting locality and special rate supplements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Locality and...

  16. 7 CFR 650.24 - Scenic beauty (visual resource).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... consideration of alternative management and development systems that preserve scenic beauty or improve the... resource values particularly in waste management systems; field borders, field windbreaks, wetland management, access roads, critical area treatment; design and management of ponds, stream margins, odd areas...

  17. 5 CFR 9701.525 - Regulations of the HSLRB.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 9701.525 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.525 Regulations of the HSLRB. The...

  18. 5 CFR 9701.406 - Setting and communicating performance expectations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... expectations. 9701.406 Section 9701.406 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.406 Setting and...

  19. 5 CFR 9701.513 - Exclusive recognition of labor organizations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... organizations. 9701.513 Section 9701.513 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.513 Exclusive...

  20. 75 FR 9250 - Notice of Public Meeting, BLM-Alaska Resource Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Land Management, on a variety of planning and management issues associated with public land management.... Manager reports. Stimulus projects update. Alaska Land Information System. National Landscape Conservation System anniversary. Resource management planning. Other topics of interest to the RAC. All meetings are...

  1. 5 CFR 9701.323 - Eligibility for pay increase associated with a rate range adjustment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Setting and...

  2. 5 CFR 9701.335 - Eligibility for pay increase associated with a supplement adjustment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Locality and...

  3. E-Resources Management: How We Positioned Our Organization to Implement an Electronic Resources Management System

    ERIC Educational Resources Information Center

    White, Marilyn; Sanders, Susan

    2009-01-01

    The Information Services Division (ISD) of the National Institute of Standards and Technology (NIST) positioned itself to successfully implement an electronic resources management system. This article highlights the ISD's unique ability to "team" across the organization to realize a common goal, develop leadership qualities in support of…

  4. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    NASA Astrophysics Data System (ADS)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  5. 75 FR 10811 - Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... adaptive management principles; and 18. The Economic Profile System will be used as one source of... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNMP01000 L16100000 DO0000] Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource Management Plan for the...

  6. Resources monitoring and automatic management system for multi-VO distributed computing system

    NASA Astrophysics Data System (ADS)

    Chen, J.; Pelevanyuk, I.; Sun, Y.; Zhemchugov, A.; Yan, T.; Zhao, X. H.; Zhang, X. M.

    2017-10-01

    Multi-VO supports based on DIRAC have been set up to provide workload and data management for several high energy experiments in IHEP. To monitor and manage the heterogeneous resources which belong to different Virtual Organizations in a uniform way, a resources monitoring and automatic management system based on Resource Status System(RSS) of DIRAC has been presented in this paper. The system is composed of three parts: information collection, status decision and automatic control, and information display. The information collection includes active and passive way of gathering status from different sources and stores them in databases. The status decision and automatic control is used to evaluate the resources status and take control actions on resources automatically through some pre-defined policies and actions. The monitoring information is displayed on a web portal. Both the real-time information and historical information can be obtained from the web portal. All the implementations are based on DIRAC framework. The information and control including sites, policies, web portal for different VOs can be well defined and distinguished within DIRAC user and group management infrastructure.

  7. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 3: Mission and System Requirements for the Total Earth Resources System

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Resource management missions to be performed by TERSSE are described. Mission and user requirements are defined along with information flows developed for each major resource management mission. Other topics discussed include: remote sensing platforms, remote sensor requirements, ground system architecture, and such related issues as cloud cover, resolution, orbit mechanics, and aircraft versus satellite.

  8. Managing Nicaraguan Water Resources Definition and Relative Importance of Information Needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engi, D.; Guillen, S.M.; Vammen, K.

    1999-01-01

    This report provides an overview of the results of the Vital the Nicaraguan Water Resources Management Initiative, Issues process as implemented for a collaborative effort between the Nicaraguan Ministry of Environment and Natural Resources and Sandia National Laboratories. This initiative is being developed to assist in the development of an efficient and sustainable water resources management system for Nicamgua. The Vital Issues process was used to provide information for developing a project that will develop and implement an advanced information system for managing Nicaragua's water resources. Three Vital Issues panel meetings were convened to 1) develop a mission statement andmore » evaluation criteria for identifying and ranking the issues vital to water resources management in Nicaragua 2) define and rank the vital issues; and 3) identify a preliminary list of information needed to address the vital issues. The selection of panelists from the four basic institutional perspectives- government, industiy, academe, and citizens' groups (through nongovernmental organizations (NGOs))-ensured a high level of stakeholder representation on the panels. The already existing need for a water resource management information system has been magnified in the aftemnath of Hurricane Mitch. This information system would be beneficial for an early warning system in emergencies, and the modeling and simulation capabilities of the system would allow for advanced planning. Additionally, the outreach program will provide education to help Nicaraguan improve their water hygiene practices.« less

  9. 5 CFR 9701.520 - Standards of conduct for labor organizations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... organizations. 9701.520 Section 9701.520 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.520 Standards of...

  10. Simulation of Tasks Distribution in Horizontally Scalable Management System

    NASA Astrophysics Data System (ADS)

    Kustov, D.; Sherstneva, A.; Botygin, I.

    2016-08-01

    This paper presents an imitational model of the task distribution system for the components of territorially-distributed automated management system with a dynamically changing topology. Each resource of the distributed automated management system is represented with an agent, which allows to set behavior of every resource in the best possible way and ensure their interaction. The agent work load imitation was done via service query imitation formed in a system dynamics style using a stream diagram. The query generation took place in the abstract-represented center - afterwards, they were sent to the drive to be distributed to management system resources according to a ranking table.

  11. 5 CFR 9701.212 - Bands.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Structure § 9701.212 Bands. (a) For purposes of identifying...

  12. 5 CFR 9701.221 - Classification requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...

  13. 5 CFR 9701.221 - Classification requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...

  14. 5 CFR 9701.221 - Classification requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...

  15. 5 CFR 9701.221 - Classification requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...

  16. 5 CFR 9701.601 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Adverse Actions General § 9701.601 Purpose. This subpart contains regulations prescribing...

  17. 5 CFR 9701.211 - Occupational clusters.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.211 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Structure § 9701.211 Occupational clusters. For...

  18. Knowledge-based systems for power management

    NASA Technical Reports Server (NTRS)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  19. The resource envelope as a basis for space station management system scheduling

    NASA Technical Reports Server (NTRS)

    Bush, Joy; Critchfield, Anna

    1987-01-01

    The Platform Management System (PMS) Resource Envelope Scheduling System (PRESS) expert system prototype developed for space station scheduling is described. The purpose of developing the prototype was too investigate the resource envelope concept in a practical scheduling application, using a commercially available expert system shell. PRESS is being developed on an IBM PC/AT using Teknowledge, Inc.'s M.1 expert system shell.

  20. The Watershed and River Systems Management Program: Decision Support for Water- and Environmental-Resource Management

    NASA Astrophysics Data System (ADS)

    Leavesley, G.; Markstrom, S.; Frevert, D.; Fulp, T.; Zagona, E.; Viger, R.

    2004-12-01

    Increasing demands for limited fresh-water supplies, and increasing complexity of water-management issues, present the water-resource manager with the difficult task of achieving an equitable balance of water allocation among a diverse group of water users. The Watershed and River System Management Program (WARSMP) is a cooperative effort between the U.S. Geological Survey (USGS) and the Bureau of Reclamation (BOR) to develop and deploy a database-centered, decision-support system (DSS) to address these multi-objective, resource-management problems. The decision-support system couples the USGS Modular Modeling System (MMS) with the BOR RiverWare tools using a shared relational database. MMS is an integrated system of computer software that provides a research and operational framework to support the development and integration of a wide variety of hydrologic and ecosystem models, and their application to water- and ecosystem-resource management. RiverWare is an object-oriented reservoir and river-system modeling framework developed to provide tools for evaluating and applying water-allocation and management strategies. The modeling capabilities of MMS and Riverware include simulating watershed runoff, reservoir inflows, and the impacts of resource-management decisions on municipal, agricultural, and industrial water users, environmental concerns, power generation, and recreational interests. Forecasts of future climatic conditions are a key component in the application of MMS models to resource-management decisions. Forecast methods applied in MMS include a modified version of the National Weather Service's Extended Streamflow Prediction Program (ESP) and statistical downscaling from atmospheric models. The WARSMP DSS is currently operational in the Gunnison River Basin, Colorado; Yakima River Basin, Washington; Rio Grande Basin in Colorado and New Mexico; and Truckee River Basin in California and Nevada.

  1. A Novel Resource Management Method of Providing Operating System as a Service for Mobile Transparent Computing

    PubMed Central

    Huang, Suzhen; Wu, Min; Zhang, Yaoxue; She, Jinhua

    2014-01-01

    This paper presents a framework for mobile transparent computing. It extends the PC transparent computing to mobile terminals. Since resources contain different kinds of operating systems and user data that are stored in a remote server, how to manage the network resources is essential. In this paper, we apply the technologies of quick emulator (QEMU) virtualization and mobile agent for mobile transparent computing (MTC) to devise a method of managing shared resources and services management (SRSM). It has three layers: a user layer, a manage layer, and a resource layer. A mobile virtual terminal in the user layer and virtual resource management in the manage layer cooperate to maintain the SRSM function accurately according to the user's requirements. An example of SRSM is used to validate this method. Experiment results show that the strategy is effective and stable. PMID:24883353

  2. A novel resource management method of providing operating system as a service for mobile transparent computing.

    PubMed

    Xiong, Yonghua; Huang, Suzhen; Wu, Min; Zhang, Yaoxue; She, Jinhua

    2014-01-01

    This paper presents a framework for mobile transparent computing. It extends the PC transparent computing to mobile terminals. Since resources contain different kinds of operating systems and user data that are stored in a remote server, how to manage the network resources is essential. In this paper, we apply the technologies of quick emulator (QEMU) virtualization and mobile agent for mobile transparent computing (MTC) to devise a method of managing shared resources and services management (SRSM). It has three layers: a user layer, a manage layer, and a resource layer. A mobile virtual terminal in the user layer and virtual resource management in the manage layer cooperate to maintain the SRSM function accurately according to the user's requirements. An example of SRSM is used to validate this method. Experiment results show that the strategy is effective and stable.

  3. 5 CFR 9701.105 - Continuing collaboration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 9701.105 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM General Provisions § 9701.105 Continuing collaboration. (a) In...

  4. 5 CFR 9701.105 - Continuing collaboration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 9701.105 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM General Provisions § 9701.105 Continuing collaboration. (a) In...

  5. 5 CFR 9701.609 - Proposal notice.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....609 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Adverse Actions Requirements for Furlough of 30 Days Or Less, Suspension...

  6. 5 CFR 9701.612 - Departmental record.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.612 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Adverse Actions Requirements for Furlough of 30 Days Or Less, Suspension...

  7. 5 CFR 9701.301 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration General § 9701.301 Purpose. (a) This subpart contains...

  8. 5 CFR 9701.603 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Adverse Actions General § 9701.603 Definitions. In this subpart: Adverse action means a...

  9. 5 CFR 9701.604 - Coverage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Adverse Actions General § 9701.604 Coverage. (a) Actions covered. This subpart covers...

  10. 5 CFR 9701.107 - Program evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....107 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM General Provisions § 9701.107 Program evaluation. (a) DHS will establish...

  11. 5 CFR 9701.103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES..., to provide Governmentwide oversight in human resources management programs and practices. Department...

  12. Cockpit resource management training

    NASA Technical Reports Server (NTRS)

    Yocum, M.; Foushee, C.

    1984-01-01

    Cockpit resource management which is a multifaceted concept is outlined. The system involves the effective coordination of many resources: aircraft systems, company, air traffic control, equipment, navigational aids, documents, and manuals. The main concept, however, is group interaction. Problems which arise from lack of coordination, decision making, and lack of communication are pointed out. Implementation by the regional airline industry of cockpit resource management, designed to deal with human interactions problems in the most cost effective manner, is discussed.

  13. Newly emerging resource efficiency manager programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolf, S.; Howell, C.

    1997-12-31

    Many facilities in the northwest such as K--12 schools, community colleges, and military installations are implementing resource-efficiency awareness programs. These programs are generally referred to as resource efficiency manager (REM) or resource conservation manager (RCM) programs. Resource efficiency management is a systems approach to managing a facility`s energy, water, and solid waste. Its aim is to reduce utility budgets by focusing on behavioral changes, maintenance and operation procedures, resource accounting, education and training, and a comprehensive awareness campaign that involves everyone in the organization.

  14. Modified stretched exponential model of computer system resources management limitations-The case of cache memory

    NASA Astrophysics Data System (ADS)

    Strzałka, Dominik; Dymora, Paweł; Mazurek, Mirosław

    2018-02-01

    In this paper we present some preliminary results in the field of computer systems management with relation to Tsallis thermostatistics and the ubiquitous problem of hardware limited resources. In the case of systems with non-deterministic behaviour, management of their resources is a key point that guarantees theirs acceptable performance and proper working. This is very wide problem that stands for many challenges in financial, transport, water and food, health, etc. areas. We focus on computer systems with attention paid to cache memory and propose to use an analytical model that is able to connect non-extensive entropy formalism, long-range dependencies, management of system resources and queuing theory. Obtained analytical results are related to the practical experiment showing interesting and valuable results.

  15. Influence of forest management systems on natural resource use and provision of ecosystem services in Tanzania.

    PubMed

    Strauch, Ayron M; Rurai, Masegeri T; Almedom, Astier M

    2016-09-15

    Social, religious and economic facets of rural livelihoods in Sub-Saharan Africa are heavily dependent on natural resources, but improper resource management, drought, and social instability frequently lead to their unsustainable exploitation. In rural Tanzania, natural resources are often governed locally by informal systems of traditional resource management (TRM), defined as cultural practices developed within the context of social and religious institutions over hundreds of years. However, following independence from colonial rule, centralized governments began to exercise jurisdictional control over natural resources. Following decades of mismanagement that resulted in lost ecosystem services, communities demanded change. To improve resource protection and participation in management among stakeholders, the Tanzanian government began to decentralize management programs in the early 2000s. We investigated these two differing management approaches (traditional and decentralized government) in Sonjo communities, to examine local perceptions of resource governance, management influences on forest use, and their consequences for forest and water resources. While 97% of households understood the regulations governing traditionally-managed forests, this was true for only 39% of households for government-managed forests, leading to differences in forest use. Traditional management practices resulted in improved forest condition and surface water quality. This research provides an essential case study demonstrating the importance of TRM in shaping decision frameworks for natural resource planning and management. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. User Requirements for the Application of Remote Sensing in the Planning and Management of Water Resource Systems

    NASA Technical Reports Server (NTRS)

    Burgy, R. H.

    1972-01-01

    Data relating to hydrologic and water resource systems and subsystems management are reported. Systems models, user application, and remote sensing technology are covered. Parameters governing water resources include evaportranspiration, vegetation, precipitation, streams and estuaries, reservoirs and lakes, and unsaturate and saturated soil zones.

  17. Self managing experiment resources

    NASA Astrophysics Data System (ADS)

    Stagni, F.; Ubeda, M.; Tsaregorodtsev, A.; Romanovskiy, V.; Roiser, S.; Charpentier, P.; Graciani, R.

    2014-06-01

    Within this paper we present an autonomic Computing resources management system, used by LHCb for assessing the status of their Grid resources. Virtual Organizations Grids include heterogeneous resources. For example, LHC experiments very often use resources not provided by WLCG, and Cloud Computing resources will soon provide a non-negligible fraction of their computing power. The lack of standards and procedures across experiments and sites generated the appearance of multiple information systems, monitoring tools, ticket portals, etc... which nowadays coexist and represent a very precious source of information for running HEP experiments Computing systems as well as sites. These two facts lead to many particular solutions for a general problem: managing the experiment resources. In this paper we present how LHCb, via the DIRAC interware, addressed such issues. With a renewed Central Information Schema hosting all resources metadata and a Status System (Resource Status System) delivering real time information, the system controls the resources topology, independently of the resource types. The Resource Status System applies data mining techniques against all possible information sources available and assesses the status changes, that are then propagated to the topology description. Obviously, giving full control to such an automated system is not risk-free. Therefore, in order to minimise the probability of misbehavior, a battery of tests has been developed in order to certify the correctness of its assessments. We will demonstrate the performance and efficiency of such a system in terms of cost reduction and reliability.

  18. 5 CFR 9701.204 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification General § 9701.204 Definitions. In this subpart: Band means a work level or...

  19. 5 CFR 9701.204 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification General § 9701.204 Definitions. In this subpart: Band means a work level or...

  20. 5 CFR 9701.345 - Developmental pay adjustments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 9701.345 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.345...

  1. 5 CFR 9701.204 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification General § 9701.204 Definitions. In this subpart: Band means a work level or...

  2. 5 CFR 9701.345 - Developmental pay adjustments.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 9701.345 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.345...

  3. 5 CFR 9701.204 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification General § 9701.204 Definitions. In this subpart: Band means a work level or...

  4. 5 CFR 9701.345 - Developmental pay adjustments.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 9701.345 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.345...

  5. 5 CFR 9701.345 - Developmental pay adjustments.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 9701.345 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.345...

  6. 5 CFR 9701.102 - Eligibility and coverage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 9701.102 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM General Provisions § 9701.102 Eligibility and coverage. (a) All...

  7. 5 CFR 9701.610 - Opportunity to reply.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.610 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Adverse Actions Requirements for Furlough of 30 Days Or Less, Suspension...

  8. 5 CFR 9701.325 - Treatment of employees whose rate of basic pay falls below the minimum rate of their band.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay...

  9. 5 CFR 9701.104 - Scope of authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....104 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM General Provisions § 9701.104 Scope of authority. Subject to the requirements...

  10. 5 CFR 9701.336 - Treatment of employees whose pay does not fall below the minimum adjusted rate of their band.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay...

  11. 5 CFR 9701.222 - Reconsideration of classification decisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... decisions. 9701.222 Section 9701.222 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.222...

  12. 5 CFR 9701.361 - Special skills payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.361 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Special Payments § 9701.361 Special skills payments...

  13. 5 CFR 9701.343 - Within-band reductions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9701.343 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.343 Within-band...

  14. 5 CFR 9701.321 - Structure of bands.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....321 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Setting and Adjusting Rate Ranges § 9701.321...

  15. 5 CFR 9701.337 - Treatment of employees whose rate of pay falls below the minimum adjusted rate of their band.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay...

  16. 5 CFR 9701.301 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES... resources are allocated for the design, implementation, and administration of the performance management...

  17. 7 CFR 631.11 - Conservation practice maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... resource management systems or conservation practices applied under the contract for the duration of the... contract. (b) If the life span of the practices or resource management systems extends beyond the period of....11 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES...

  18. Positives and pathologies of natural resource management on private land-conservation areas.

    PubMed

    Clements, Hayley S; Cumming, Graeme S

    2017-06-01

    In managed natural resource systems, such as fisheries and rangelands, there is a recognized trade-off between managing for short-term benefits and managing for longer term resilience. Management actions that stabilize ecological attributes or processes can improve productivity in the supply of ecosystem goods and services in the short term but erode system resilience at longer time scales. For example, fire suppression in rangelands can increase grass biomass initially but ultimately result in an undesirable, shrub-dominated system. Analyses of this phenomenon have focused largely on how management actions influence slow-changing biophysical system attributes (such as vegetation composition). Data on the frequency of management actions that reduce natural ecological variation on 66 private land-conservation areas (PLCAs) in South Africa were used to investigate how management actions are influenced by manager decision-making approaches, a largely ignored part of the problem. The pathology of natural resource management was evident on some PLCAs: increased focus on revenue-generation in decision making resulted in an increased frequency of actions to stabilize short-term variation in large mammal populations, which led to increased revenues from ecotourism or hunting. On many PLCAs, these management actions corresponded with a reduced focus on ecological monitoring and an increase in overstocking of game (i.e., ungulate species) and stocking of extralimitals (i.e., game species outside their historical range). Positives in natural resource management also existed. Some managers monitored slower changing ecological attributes, which resulted in less-intensive management, fewer extralimital species, and lower stocking rates. Our unique, empirical investigation of monitoring-management relationships illustrates that management decisions informed by revenue monitoring versus ecological monitoring can have opposing consequences for natural resource productivity and sustainability. Promoting management actions that maintain resilience in natural resource systems therefore requires cognizance of why managers act the way they do and how these actions can gradually shift managers toward unsustainable strategies. © 2016 Society for Conservation Biology.

  19. Fuelwood, agro-forestry, and natural resource management: the development significance of land tenure and other resource management/utilization systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brokensha, D.; Castro, A.P.; Kundu, M.

    1984-04-01

    Using a systems approach and focusing on the social context, the study examines natural resource management in relation to fuelwood production and agroforestry. An initial section describing the use and interlinkage of the concepts of ecozone and ecosystem is followed by a discussion of problem ecozones, human use of ecozones, agricultural ecosystems, resource competition, uses of trees and forest products, and tree planting. Rural resource management strategies at the household, community, local, and state levels are discussed in the context of political economy, land tenure and rights, tenancy and sharecropping, group or public landholding, and acquisition and transfer of land.

  20. 78 FR 60880 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... Commissioner (KFB) Division of Business and Resource Management (KFB2) Division of Customer Communications... Systems, Division of Business and Resource Management, Division of Customer Communications, Division of...: The Division of Management Services to the Division of Business and Resource Management; the Division...

  1. Air traffic control resource management strategies and the small aircraft transportation system: A system dynamics perspective

    NASA Astrophysics Data System (ADS)

    Galvin, James J., Jr.

    The National Aeronautics and Space Administration (NASA) is leading a research effort to develop a Small Aircraft Transportation System (SATS) that will expand air transportation capabilities to hundreds of underutilized airports in the United States. Most of the research effort addresses the technological development of the small aircraft as well as the systems to manage airspace usage and surface activities at airports. The Federal Aviation Administration (FAA) will also play a major role in the successful implementation of SATS, however, the administration is reluctant to embrace the unproven concept. The purpose of the research presented in this dissertation is to determine if the FAA can pursue a resource management strategy that will support the current radar-based Air Traffic Control (ATC) system as well as a Global Positioning Satellite (GPS)-based ATC system required by the SATS. The research centered around the use of the System Dynamics modeling methodology to determine the future behavior of the principle components of the ATC system over time. The research included a model of the ATC system consisting of people, facilities, equipment, airports, aircraft, the FAA budget, and the Airport and Airways Trust Fund. The model generated system performance behavior used to evaluate three scenarios. The first scenario depicted the base case behavior of the system if the FAA continued its current resource management practices. The second scenario depicted the behavior of the system if the FAA emphasized development of GPS-based ATC systems. The third scenario depicted a combined resource management strategy that supplemented radar systems with GPS systems. The findings of the research were that the FAA must pursue a resource management strategy that primarily funds a radar-based ATC system and directs lesser funding toward a GPS-based supplemental ATC system. The most significant contribution of this research was the insight and understanding gained of how several resource management strategies and the presence of SATS aircraft may impact the future US Air Traffic Control system.

  2. 5 CFR 9701.324 - Treatment of employees whose rate of basic pay does not fall below the minimum rate of their band.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and...

  3. Tailoring Software for Multiple Processor Systems

    DTIC Science & Technology

    1982-10-01

    resource management decisions . Despite the lack of programming support, the use of multiple processor systems has grown sub- -stantially. Software has...making resource management decisions . Specifically, program- 1 mers need not allocate specific hardware resources to individual program components...Instead, such allocation decisions are automatically made based on high-level resource directives stated by ap- plication programmers, where each directive

  4. An information system to improve financial management, resource allocation and activity planning: evaluation results.

    PubMed

    Ruland, C M; Ravn, I H

    2001-01-01

    An important strategy for improving resource management and cost containment in health care is to develop information systems that assist hospital managers in financial management, resource allocation, and activity planning. A crucial part of such development is a rigorous evaluation to assess whether the system accomplishes it's intended goals. To evaluate CLASSICA, a Decision Support System (DSS), that assists nurse managers in financial management, resource allocation, staffing, and activity planning. Using a pre-post test design with control units, CLASSICA was evaluated in four test units. Baseline data and simultaneous parallel measures were collected prior to system implementation at test sites and control units. Using expense reports, staffing and financial statistics, surveys, interviews with nurse managers, and logs as data sources, CLASSICA was evaluated on: cost reduction, quality of management information; usefulness as decision support for improved financial management and decision-making; user satisfaction; and ease of use. Evaluation results showed a 41% reduction in expenditures for overtime and extra hours as compared to a 1.8% reduction in control units during the same time period. Users reported a significant improvement in management information; nurse managers stated that they had gained control over costs. The system helped them analyze the relationships between patient activity staffing, and cost of care. Users reported high satisfaction with the system, the information and decision support it provided, and its ease of use. These results suggest that CLASSICA is a DSS that successfully assists nurse managers in cost effective management of their units.

  5. Managing Selection for Electronic Resources: Kent State University Develops a New System to Automate Selection

    ERIC Educational Resources Information Center

    Downey, Kay

    2012-01-01

    Kent State University has developed a centralized system that manages the communication and work related to the review and selection of commercially available electronic resources. It is an automated system that tracks the review process, provides selectors with price and trial information, and compiles reviewers' feedback about the resource. It…

  6. SLURM: Simple Linux Utility for Resource Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jette, M; Dunlap, C; Garlick, J

    2002-04-24

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, and scheduling modules. The design also includes a scalable, general-purpose communication infrastructure. Development will take place in four phases: Phase I results in a solid infrastructure; Phase II produces a functional but limited interactive job initiation capability without use of the interconnect/switch; Phase III provides switch support and documentation; Phase IV provides job status, fault-tolerance, and job queuing and control through Livermore's Distributed Productionmore » Control System (DPCS), a meta-batch and resource management system.« less

  7. A Decision Support System For The Real-Time Allocation Of The Water Resource Of The Tarim River Basin, China

    NASA Astrophysics Data System (ADS)

    Wei, J.; Wang, G.; Liu, R.

    2008-12-01

    The Tarim River Basin is the longest inland river in China. Due to water scarcity, ecologically-fragile is becoming a significant constraint to sustainable development in this region. To effectively manage the limited water resources for ecological purposes and for conventional water utilization purposes, a real-time water resources allocation Decision Support System (DSS) has been developed. Based on workflows of the water resources regulations and comprehensive analysis of the efficiency and feasibility of water management strategies, the DSS includes information systems that perform data acquisition, management and visualization, and model systems that perform hydrological forecast, water demand prediction, flow routing simulation and water resources optimization of the hydrological and water utilization process. An optimization and process control strategy is employed to dynamically allocate the water resources among the different stakeholders. The competitive targets and constraints are taken into considered by multi-objective optimization and with different priorities. The DSS of the Tarim River Basin has been developed and been successfully utilized to support the water resources management of the Tarim River Basin since 2005.

  8. 5 CFR 9701.232 - Special transition rules for Federal Air Marshal Service.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Marshal Service. 9701.232 Section 9701.232 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Classification Transitional Provisions § 9701.232...

  9. 5 CFR 9701.374 - Special transition rules for Federal Air Marshal Service.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Marshal Service. 9701.374 Section 9701.374 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Transitional Provisions...

  10. National Silviculture Meeting: Forestry to meet special objectives (A look at uneven-aged management); Marquette, Michigan; September 10-14, 1973

    Treesearch

    Michael A. Barton; Louis J. Verme; Robert E. Radtke; Berwyn O. Reed; William T. Plass; Stephen G. Boyce

    1973-01-01

    As a matter of policy and good forest resource management, the Forest Service will manage the timber resources on the National Forests to achieve the various multiple use objectives established for the respective management units. In so doing, we are not to be bound to any particular system of management as the primary system, but we are to prescribe and use the system...

  11. 77 FR 74178 - Notice of Intent To Grant Exclusive Patent License: Kismet Management Fund LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ...,248: Program Control for Resource Management Architecture and Corresponding Programs//U.S. Patent No. 7,171,654: System Specification Language for Resource Management Architecture and Corresponding... Architecture and Corresponding Programs//U.S. Patent No. 7,552,438: Resource Management Device. DATES: Anyone...

  12. CORSET: Service-Oriented Resource Management System in Linux

    NASA Astrophysics Data System (ADS)

    Kang, Dong-Jae; Kim, Chei-Yol; Jung, Sung-In

    Generally, system resources are not enough for many running services and applications in a system. And services are more important than single process in real world and they have different priority or importance. So each service should be treated with discrimination in aspect of system resources. But administrator can't guarantee the specific service has proper resources in unsettled workload situation because many processes are in race condition. So, we suppose the service-oriented resource management subsystem to resolve upper problems. It guarantees the performance or QoS of the specific service in changeable workload situation by satisfying the minimum resource requirement for the service.

  13. An integrated decision support system for TRAC: A proposal

    NASA Technical Reports Server (NTRS)

    Mukkamala, Ravi

    1991-01-01

    Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.

  14. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 7: User Models: A System Assessment

    NASA Technical Reports Server (NTRS)

    1974-01-01

    User models defined as any explicit process or procedure used to transform information extracted from remotely sensed data into a form useful as a resource management information input are discussed. The role of the user models as information, technological, and operations interfaces between the TERSSE and the resource managers is emphasized. It is recommended that guidelines and management strategies be developed for a systems approach to user model development.

  15. 76 FR 4721 - Notice of the Joint Colorado Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Conservation System, recreation, land-use planning, fire, energy and minerals management, travel management, wilderness, wild horse herd management, land exchange proposals, and cultural resource management. These...

  16. Who to Blame: Irrational Decision-Makers or Stupid Modelers? (Arne Richter Award for Outstanding Young Scientists Lecture)

    NASA Astrophysics Data System (ADS)

    Madani, Kaveh

    2016-04-01

    Water management benefits from a suite of modelling tools and techniques that help simplifying and understanding the complexities involved in managing water resource systems. Early water management models were mainly concerned with optimizing a single objective, related to the design, operations or management of water resource systems (e.g. economic cost, hydroelectricity production, reliability of water deliveries). Significant improvements in methodologies, computational capacity, and data availability over the last decades have resulted in developing more complex water management models that can now incorporate multiple objectives, various uncertainties, and big data. These models provide an improved understanding of complex water resource systems and provide opportunities for making positive impacts. Nevertheless, there remains an alarming mismatch between the optimal solutions developed by these models and the decisions made by managers and stakeholders of water resource systems. Modelers continue to consider decision makers as irrational agents who fail to implement the optimal solutions developed by sophisticated and mathematically rigours water management models. On the other hand, decision makers and stakeholders accuse modelers of being idealist, lacking a perfect understanding of reality, and developing 'smart' solutions that are not practical (stable). In this talk I will have a closer look at the mismatch between the optimality and stability of solutions and argue that conventional water resources management models suffer inherently from a full-cooperation assumption. According to this assumption, water resources management decisions are based on group rationality where in practice decisions are often based on individual rationality, making the group's optimal solution unstable for individually rational decision makers. I discuss how game theory can be used as an appropriate framework for addressing the irrational "rationality assumption" of water resources management models and for better capturing the social aspects of decision making in water management systems with multiple stakeholders.

  17. Faster response time, effective use of resources : integrating transportation systems and emergency management systems.

    DOT National Transportation Integrated Search

    1999-01-01

    When emergency services agencies share : facilities and traffic monitoring resources : with transportation management agencies, : the efficiency and speed of incident : response are measurably improved.

  18. Hydromentor: An integrated water resources monitoring and management system at modified semi-arid watersheds

    NASA Astrophysics Data System (ADS)

    Vasiliades, Lampros; Sidiropoulos, Pantelis; Tzabiras, John; Kokkinos, Konstantinos; Spiliotopoulos, Marios; Papaioannou, George; Fafoutis, Chrysostomos; Michailidou, Kalliopi; Tziatzios, George; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-04-01

    Natural and engineered water systems interact throughout watersheds and while there is clearly a link between watershed activities and the quantity and quality of water entering the engineered environment, these systems are considered distinct operational systems. As a result, the strategic approach to data management and modeling within the two systems is very different, leading to significant difficulties in integrating the two systems in order to make comprehensive watershed decisions. In this paper, we describe the "HYDROMENTOR" research project, a highly-structured data storage and exchange system that integrates multiple tools and models describing both natural and modified environments, to provide an integrated tool for management of water resources. Our underlying objective in presenting our conceptual design for this water information system is to develop an integrated and automated system that will achieve monitoring and management of the water quantity and quality at watershed level for both surface water (rivers and lakes) and ground water resources (aquifers). The uniqueness of the system is the integrated treatment of the water resources management issue in terms of water quantity and quality in current climate conditions and in future conditions of climatic change. On an operational level, the system provides automated warnings when the availability, use and pollution levels exceed allowable limits pre-set by the management authorities. Decision making with respect to the apportionment of water use by surface and ground water resources are aided through this system, while the relationship between the polluting activity of a source to total incoming pollution by sources are determined; this way, the best management practices for dealing with a crisis are proposed. The computational system allows the development and application of actions, interventions and policies (alternative management scenarios) so that the impacts of climate change in quantity, quality and use of water resources could be evaluated and managed. Acknowledgements: This study has been supported by the research project "Hydromentor" funded by the Greek General Secretariat of Research and Technology in the framework of the E.U. co-funded National Action "Cooperation".

  19. Remote sensing applied to resource management

    Treesearch

    Henry M. Lachowski

    1998-01-01

    Effective management of forest resources requires access to current and consistent geospatial information that can be shared by resource managers and the public. Geospatial information describing our land and natural resources comes from many sources and is most effective when stored in a geospatial database and used in a geographic information system (GIS). The...

  20. Investigation on Reservoir Operation of Agricultural Water Resources Management for Drought Mitigation

    NASA Astrophysics Data System (ADS)

    Cheng, C. L.

    2015-12-01

    Investigation on Reservoir Operation of Agricultural Water Resources Management for Drought Mitigation Chung-Lien Cheng, Wen-Ping Tsai, Fi-John Chang* Department of Bioenvironmental Systems Engineering, National Taiwan University, Da-An District, Taipei 10617, Taiwan, ROC.Corresponding author: Fi-John Chang (changfj@ntu.edu.tw) AbstractIn Taiwan, the population growth and economic development has led to considerable and increasing demands for natural water resources in the last decades. Under such condition, water shortage problems have frequently occurred in northern Taiwan in recent years such that water is usually transferred from irrigation sectors to public sectors during drought periods. Facing the uneven spatial and temporal distribution of water resources and the problems of increasing water shortages, it is a primary and critical issue to simultaneously satisfy multiple water uses through adequate reservoir operations for sustainable water resources management. Therefore, we intend to build an intelligent reservoir operation system for the assessment of agricultural water resources management strategy in response to food security during drought periods. This study first uses the grey system to forecast the agricultural water demand during February and April for assessing future agricultural water demands. In the second part, we build an intelligent water resources system by using the non-dominated sorting genetic algorithm-II (NSGA-II), an optimization tool, for searching the water allocation series based on different water demand scenarios created from the first part to optimize the water supply operation for different water sectors. The results can be a reference guide for adequate agricultural water resources management during drought periods. Keywords: Non-dominated sorting genetic algorithm-II (NSGA-II); Grey System; Optimization; Agricultural Water Resources Management.

  1. Application of remote sensing and Geographic Information Systems to ecosystem-based urban natural resource management

    Treesearch

    Xiaohui Zhang; George Ball; Eve Halper

    2000-01-01

    This paper presents an integrated system to support urban natural resource management. With the application of remote sensing (RS) and geographic information systems (GIS), the paper emphasizes the methodology of integrating information technology and a scientific basis to support ecosystem-based management. First, a systematic integration framework is developed and...

  2. AOIPS water resources data management system

    NASA Technical Reports Server (NTRS)

    Merritt, E. S.; Shotwell, R. L.; Place, M. C.; Belknap, N. J.

    1976-01-01

    A geocoded data management system applicable for hydrological applications was designed to demonstrate the utility of the Atmospheric and Oceanographic Information Processing System (AOIPS) for hydrological applications. Within that context, the geocoded hydrology data management system was designed to take advantage of the interactive capability of the AOIPS hardware. Portions of the Water Resource Data Management System which best demonstrate the interactive nature of the hydrology data management system were implemented on the AOIPS. A hydrological case study was prepared using all data supplied for the Bear River watershed located in northwest Utah, southeast Idaho, and western Wyoming.

  3. A resource management tool for public health continuity of operations during disasters.

    PubMed

    Turner, Anne M; Reeder, Blaine; Wallace, James C

    2013-04-01

    We developed and validated a user-centered information system to support the local planning of public health continuity of operations for the Community Health Services Division, Public Health - Seattle & King County, Washington. The Continuity of Operations Data Analysis (CODA) system was designed as a prototype developed using requirements identified through participatory design. CODA uses open-source software that links personnel contact and licensing information with needed skills and clinic locations for 821 employees at 14 public health clinics in Seattle and King County. Using a web-based interface, CODA can visualize locations of personnel in relationship to clinics to assist clinic managers in allocating public health personnel and resources under dynamic conditions. Based on user input, the CODA prototype was designed as a low-cost, user-friendly system to inventory and manage public health resources. In emergency conditions, the system can run on a stand-alone battery-powered laptop computer. A formative evaluation by managers of multiple public health centers confirmed the prototype design's usefulness. Emergency management administrators also provided positive feedback about the system during a separate demonstration. Validation of the CODA information design prototype by public health managers and emergency management administrators demonstrates the potential usefulness of building a resource management system using open-source technologies and participatory design principles.

  4. A Resource Management Tool for Public Health Continuity of Operations During Disasters

    PubMed Central

    Turner, Anne M.; Reeder, Blaine; Wallace, James C.

    2014-01-01

    Objective We developed and validated a user-centered information system to support the local planning of public health continuity of operations for the Community Health Services Division, Public Health - Seattle & King County, Washington. Methods The Continuity of Operations Data Analysis (CODA) system was designed as a prototype developed using requirements identified through participatory design. CODA uses open-source software that links personnel contact and licensing information with needed skills and clinic locations for 821 employees at 14 public health clinics in Seattle and King County. Using a web-based interface, CODA can visualize locations of personnel in relationship to clinics to assist clinic managers in allocating public health personnel and resources under dynamic conditions. Results Based on user input, the CODA prototype was designed as a low-cost, user-friendly system to inventory and manage public health resources. In emergency conditions, the system can run on a stand-alone battery-powered laptop computer. A formative evaluation by managers of multiple public health centers confirmed the prototype design’s usefulness. Emergency management administrators also provided positive feedback about the system during a separate demonstration. Conclusions Validation of the CODA information design prototype by public health managers and emergency management administrators demonstrates the potential usefulness of building a resource management system using open-source technologies and participatory design principles. PMID:24618165

  5. 5 CFR 9701.355 - Setting pay upon movement to a different occupational cluster.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... occupational cluster. 9701.355 Section 9701.355 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Pay Administration § 9701...

  6. Application of SWMM in Water Resources Management: A Community Scale Study

    NASA Astrophysics Data System (ADS)

    Li, Yuan-Hua; Tung, Ching-Pin

    2015-04-01

    Under the impacts of climate change, water resource management faces a serious challenge. Due to extremely events, the water supply system is hard to maintain stable water supply. In order to decrease the pressure of centralized water supply system, the water demand management should be strengthened. The storm water management model (SWMM) is widely used to simulate surface runoff, and it has been improved to have the ability of continuous simulation. In this study, storm water management model (SWMM) is applied to simulate surface runoff and integrated into the framework of water resource management for a rural community scale. In a rural community, the surface runoff may be collected and treated by wetlands for later uses. The reclaimed water from wetlands may become a new water resource for non-contact domestic water uses, or be reused to meet irrigating water demand. Thus, the water demand from the centralized system can be reduced, and the water supply system may have lower risk under the climate change. On the other hand, SWMM can simulate the measures of low impact development (LID), such as bio-retention cell, green roof, rain barrel etc. The decentralized measures, LID, may not only reduce the runoff and delay the peak flow, and but also provide the service of water supply. In this study, LID is applied to water resource management of a rural community, and combined with the centralized water supply system. The results show the application of SWMM to water resources management in a community scale study. Besides, the effectiveness of LID on water supply is also evaluated.

  7. 76 FR 5607 - Notice of Intent To Prepare a Resource Management Plan for the Rock Springs Field Office, Wyoming...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ..., recreation, visual resource management, public safety, law enforcement, and geographic information systems... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWY930000-L16100000-DS0000] Notice of Intent To Prepare a Resource Management Plan for the Rock Springs Field Office, Wyoming and Associated...

  8. Linking ecological and social scales for natural resource management

    Treesearch

    Kristiina A. Vogt; Morgan Grove; Heidi Asjornsen; Keely B. Maxwell; Daniel J. Vogt; Ragnhildur Sigurdardottir; Bruce C. Larson; Leo Schibli; Michael Dove

    2002-01-01

    Natural resource management has moved from a single disciplinary and one resource management approach to an interdisciplinary and ecosystem-based approach. Many conceptual models are being developed to understand and implement ecosystem management and forest certification initiatives that require an integration of data from both the social and natural systems (Vogt...

  9. Website creation and resource management: developing collaborative strategies for asynchronous interaction with library users.

    PubMed

    Hopkins, Mark E; Summers-Ables, Joy E; Clifton, Shari C; Coffman, Michael A

    2011-06-01

    To make electronic resources available to library users while effectively harnessing intellectual capital within the library, ultimately fostering the library's use of technology to interact asynchronously with its patrons (users). The methods used in the project included: (1) developing a new library website to facilitate the creation, management, accessibility, maintenance and dissemination of library resources; and (2) establishing ownership by those who participated in the project, while creating effective work allocation strategies through the implementation of a content management system that allowed the library to manage cost, complexity and interoperability. Preliminary results indicate that contributors to the system benefit from an increased understanding of the library's resources and add content valuable to library patrons. These strategies have helped promote the manageable creation and maintenance of electronic content in accomplishing the library's goal of interacting with its patrons. Establishment of a contributive system for adding to the library's electronic resources and electronic content has been successful. Further work will look at improving asynchronous interaction, particularly highlighting accessibility of electronic content and resources. © 2010 The authors. Health Information and Libraries Journal © 2010 Health Libraries Group.

  10. A Study on Governance and Human Resources for Cooperative Road Facilities Management

    NASA Astrophysics Data System (ADS)

    Ohno, Sachiko; Takagi, Akiyoshi; Kurauchi, Fumitaka; Demura, Yoshifumi

    Within today's infrastructure management, Asset Management systems are becoming a mainstream feature. For region where the risk is low, it is necessary to create a "cooperative road facilities management system". This research both examined and suggested what kind of cooperative road facilities management system should be promoted by the regional society. Concretely, this study defines the operational realities of a previous case. It discusses the problem of the road facilities management as a governance. Furthermore, its realization depends on "the cooperation between municipalities", "the private-sector initiative", and "residents participation" .Also, it discusses the problem of human resources for governance. Its realization depends on "the engineers' promotion", and "creation of a voluntary activity of the resident" as a human resources. Moreover, it defines that the intermediary is important because the human resources tied to the governance. As a result, the prospect of the road facilities management is shown by the role of the player and the relation among player.

  11. Non-Procedural Languages for Information Resource Management.

    ERIC Educational Resources Information Center

    Bearley, William L.

    The future of information resources management requires new approaches to implementing systems which will include a type of data base management that frees users to solve data processing problems logically by telling the system what they want, together with powerful non-procedural languages that will permit communication in simple, concise…

  12. Chapter 15. Plant pathology and managing wildland plant disease systems

    Treesearch

    David L. Nelson

    2004-01-01

    Obtaining specific, reliable knowledge on plant diseases is essential in wildland shrub resource management. However, plant disease is one of the most neglected areas of wildland resources experimental research. This section is a discussion of plant pathology and how to use it in managing plant disease systems.

  13. Program Management Collection. "LINCS" Resource Collection News

    ERIC Educational Resources Information Center

    Literacy Information and Communication System, 2011

    2011-01-01

    This edition of "'LINCS' Resource Collection News" features the Program Management Collection, which covers the topics of Assessment, Learning Disabilities, and Program Improvement. Each month Collections News features one of the three "LINCS" (Literacy Information and Communication System) Resource Collections--Basic Skills, Program Management,…

  14. 76 FR 33286 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... locations: Federal Housing Finance Agency, Office of Human Resources Management, 1700 G Street, NW... Human Resources Management, 1700 G Street, NW., Washington, DC 20552; 1625 Eye Street, NW., Washington...: Office of Human Resources Management, Federal Housing Finance Agency, 1625 Eye Street, NW., Washington...

  15. Boundary Conditions of the High-Investment Human Resource Systems-Small-Firm Labor Productivity Relationship

    ERIC Educational Resources Information Center

    Chadwick, Clint; Way, Sean A.; Kerr, Gerry; Thacker, James W.

    2013-01-01

    Although a few published, multiindustry, firm-level, empirical studies have linked systems of high-investment or high-performance human resource management practices to enhanced small-firm performance, this stream of strategic human resource management research is underdeveloped and equivocal. Accordingly, in this study, we use a sample of…

  16. Development and implementation of a PACS network and resource manager

    NASA Astrophysics Data System (ADS)

    Stewart, Brent K.; Taira, Ricky K.; Dwyer, Samuel J., III; Huang, H. K.

    1992-07-01

    Clinical acceptance of PACS is predicated upon maximum uptime. Upon component failure, detection, diagnosis, reconfiguration and repair must occur immediately. Our current PACS network is large, heterogeneous, complex and wide-spread geographically. The overwhelming number of network devices, computers and software processes involved in a departmental or inter-institutional PACS makes development of tools for network and resource management critical. The authors have developed and implemented a comprehensive solution (PACS Network-Resource Manager) using the OSI Network Management Framework with network element agents that respond to queries and commands for network management stations. Managed resources include: communication protocol layers for Ethernet, FDDI and UltraNet; network devices; computer and operating system resources; and application, database and network services. The Network-Resource Manager is currently being used for warning, fault, security violation and configuration modification event notification. Analysis, automation and control applications have been added so that PACS resources can be dynamically reconfigured and so that users are notified when active involvement is required. Custom data and error logging have been implemented that allow statistics for each PACS subsystem to be charted for performance data. The Network-Resource Manager allows our departmental PACS system to be monitored continuously and thoroughly, with a minimal amount of personal involvement and time.

  17. System and methods of resource usage using an interoperable management framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heileman, Gregory L.; Jamkhedkar, Pramod A.; Lamb, Christopher C.

    Generic rights expression language allowing interoperability across different computing environments including resource usage of different applications. A formal framework for usage management provides scaffolding upon which interoperable usage management systems can be built. Certain features of the framework are standardized, such as the operational semantics, including areas free of standards that necessitate choice and innovation to achieve a balance of flexibility and usability for interoperability in usage management systems.

  18. 12 CFR 600.4 - Organization of the Farm Credit Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agency's chartering activities; and analyzes policy and strategic risks to the System. (6) Office of Management Services. The Office of Management Services provides financial management services. It administers the Agency's information resources management program; human resources management program; and...

  19. 12 CFR 600.4 - Organization of the Farm Credit Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agency's chartering activities; and analyzes policy and strategic risks to the System. (6) Office of Management Services. The Office of Management Services provides financial management services. It administers the Agency's information resources management program; human resources management program; and...

  20. Threshold concepts: implications for the management of natural resources

    USGS Publications Warehouse

    Guntenspergen, Glenn R.; Gross, John

    2014-01-01

    Threshold concepts can have broad relevance in natural resource management. However, the concept of ecological thresholds has not been widely incorporated or adopted in management goals. This largely stems from the uncertainty revolving around threshold levels and the post hoc analyses that have generally been used to identify them. Natural resource managers have a need for new tools and approaches that will help them assess the existence and detection of conditions that demand management actions. Recognition of additional threshold concepts include: utility thresholds (which are based on human values about ecological systems) and decision thresholds (which reflect management objectives and values and include ecological knowledge about a system) as well as ecological thresholds. All of these concepts provide a framework for considering the use of threshold concepts in natural resource decision making.

  1. Storage resource manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perelmutov, T.; Bakken, J.; Petravick, D.

    Storage Resource Managers (SRMs) are middleware components whose function is to provide dynamic space allocation and file management on shared storage components on the Grid[1,2]. SRMs support protocol negotiation and reliable replication mechanism. The SRM standard supports independent SRM implementations, allowing for a uniform access to heterogeneous storage elements. SRMs allow site-specific policies at each location. Resource Reservations made through SRMs have limited lifetimes and allow for automatic collection of unused resources thus preventing clogging of storage systems with ''orphan'' files. At Fermilab, data handling systems use the SRM management interface to the dCache Distributed Disk Cache [5,6] and themore » Enstore Tape Storage System [15] as key components to satisfy current and future user requests [4]. The SAM project offers the SRM interface for its internal caches as well.« less

  2. Managing Human Resources--Implications for Training Policies.

    ERIC Educational Resources Information Center

    Tenne, Ruth

    1979-01-01

    The author discusses some important MHR (management of human resources) issues and stresses the importance of considering human resources problems in relation to the present socioeconomic system and the changing needs of society. (CT)

  3. Apparatus and method for managing digital resources by passing digital resource tokens between queues

    DOEpatents

    Crawford, H.J.; Lindenstruth, V.

    1999-06-29

    A method of managing digital resources of a digital system includes the step of reserving token values for certain digital resources in the digital system. A selected token value in a free-buffer-queue is then matched to an incoming digital resource request. The selected token value is then moved to a valid-request-queue. The selected token is subsequently removed from the valid-request-queue to allow a digital agent in the digital system to process the incoming digital resource request associated with the selected token. Thereafter, the selected token is returned to the free-buffer-queue. 6 figs.

  4. Apparatus and method for managing digital resources by passing digital resource tokens between queues

    DOEpatents

    Crawford, Henry J.; Lindenstruth, Volker

    1999-01-01

    A method of managing digital resources of a digital system includes the step of reserving token values for certain digital resources in the digital system. A selected token value in a free-buffer-queue is then matched to an incoming digital resource request. The selected token value is then moved to a valid-request-queue. The selected token is subsequently removed from the valid-request-queue to allow a digital agent in the digital system to process the incoming digital resource request associated with the selected token. Thereafter, the selected token is returned to the free-buffer-queue.

  5. Integrating Bill of Materials Data Into the Armys Enterprise Resource Planning Systems

    DTIC Science & Technology

    2016-05-17

    management with a concentration in human resources from Virginia State University and an MBA from Averett University, and he is a public policy...57 Army Sustainment November–December 2015 As the Army moves to an en-terprise resource planning... Resource Planning Systems  By LeQuan M. Hylton TOOLS The fielding of Global Combat Support System–Army has changed the way the Army manages bill

  6. American Indian Systems for Natural Resource Management.

    ERIC Educational Resources Information Center

    Quintana, Jorge O.

    1992-01-01

    Outlines the philosophy and general principles of "primitive" indigenous production technologies and natural resource management systems in North and South America. Discusses indigenous practices that promote sustainable production in gathering, hunting and fishing, minerals extraction, and agriculture. (SV)

  7. Optimization and resilience in natural resources management

    USGS Publications Warehouse

    Williams, Byron K.; Johnson, Fred A.

    2015-01-01

    We consider the putative tradeoff between optimization and resilience in the management of natural resources, using a framework that incorporates different sources of uncertainty that are common in natural resources management. We address one-time decisions, and then expand the decision context to the more complex problem of iterative decision making. For both cases we focus on two key sources of uncertainty: partial observability of system state and uncertainty as to system dynamics. Optimal management strategies will vary considerably depending on the timeframe being considered and the amount and quality of information that is available to characterize system features and project the consequences of potential decisions. But in all cases an optimal decision making framework, if properly identified and focused, can be useful in recognizing sound decisions. We argue that under the conditions of deep uncertainty that characterize many resource systems, an optimal decision process that focuses on robustness does not automatically induce a loss of resilience.

  8. An Architecture for Cross-Cloud System Management

    NASA Astrophysics Data System (ADS)

    Dodda, Ravi Teja; Smith, Chris; van Moorsel, Aad

    The emergence of the cloud computing paradigm promises flexibility and adaptability through on-demand provisioning of compute resources. As the utilization of cloud resources extends beyond a single provider, for business as well as technical reasons, the issue of effectively managing such resources comes to the fore. Different providers expose different interfaces to their compute resources utilizing varied architectures and implementation technologies. This heterogeneity poses a significant system management problem, and can limit the extent to which the benefits of cross-cloud resource utilization can be realized. We address this problem through the definition of an architecture to facilitate the management of compute resources from different cloud providers in an homogenous manner. This preserves the flexibility and adaptability promised by the cloud computing paradigm, whilst enabling the benefits of cross-cloud resource utilization to be realized. The practical efficacy of the architecture is demonstrated through an implementation utilizing compute resources managed through different interfaces on the Amazon Elastic Compute Cloud (EC2) service. Additionally, we provide empirical results highlighting the performance differential of these different interfaces, and discuss the impact of this performance differential on efficiency and profitability.

  9. 7 CFR 1955.56 - Real property located in Coastal Barrier Resources System (CBRS).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Management of Property § 1955.56 Real property located in Coastal Barrier Resources System (CBRS). (a... System (CBRS). 1955.56 Section 1955.56 Agriculture Regulations of the Department of Agriculture...

  10. GRIN-Global: An International Project to Develop a Global Plant Genebank and Information Management System

    USDA-ARS?s Scientific Manuscript database

    The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...

  11. GRIN-Global: An International Project to Develop a Global Plant Genebank and Information Management System

    USDA-ARS?s Scientific Manuscript database

    The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world's crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...

  12. GRIN-Global: An International Project to Develop a Global Plant Genebank and Information Management System

    USDA-ARS?s Scientific Manuscript database

    The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR...

  13. GRIN-Global: An International Project to Develop a Global Plant Genebank Information Management System

    USDA-ARS?s Scientific Manuscript database

    The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...

  14. The Next Step in Educational Program Budgets and Information Resource Management: Integrated Data Structures.

    ERIC Educational Resources Information Center

    Jackowski, Edward M.

    1988-01-01

    Discusses the role that information resource management (IRM) plays in educational program-oriented budgeting (POB), and presents a theoretical IRM model. Highlights include design considerations for integrated data systems; database management systems (DBMS); and how POB data can be integrated to enhance its value and use within an educational…

  15. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  16. Managing Human Resources in a Multinational Context

    ERIC Educational Resources Information Center

    Sumetzberger, Walter

    2005-01-01

    Purpose: To develop more sensitivity for different patterns of human resource management in multinational companies. Design/methodology/approach: Systemic approach; the concepts and models are based on the evaluation of consulting projects in the field of human resource management. Findings: A concept of four typical varieties of human resource…

  17. 5 CFR 9701.401 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES... adequate resources are allocated for the design, implementation, and administration of the performance...

  18. A study of computer graphics technology in application of communication resource management

    NASA Astrophysics Data System (ADS)

    Li, Jing; Zhou, Liang; Yang, Fei

    2017-08-01

    With the development of computer technology, computer graphics technology has been widely used. Especially, the success of object-oriented technology and multimedia technology promotes the development of graphics technology in the computer software system. Therefore, the computer graphics theory and application technology have become an important topic in the field of computer, while the computer graphics technology becomes more and more extensive in various fields of application. In recent years, with the development of social economy, especially the rapid development of information technology, the traditional way of communication resource management cannot effectively meet the needs of resource management. In this case, the current communication resource management is still using the original management tools and management methods, resource management equipment management and maintenance, which brought a lot of problems. It is very difficult for non-professionals to understand the equipment and the situation in communication resource management. Resource utilization is relatively low, and managers cannot quickly and accurately understand the resource conditions. Aimed at the above problems, this paper proposes to introduce computer graphics technology into the communication resource management. The introduction of computer graphics not only makes communication resource management more vivid, but also reduces the cost of resource management and improves work efficiency.

  19. Applying management information systems to staffing.

    PubMed

    Hanson, R L

    1982-10-01

    A management information system (MIS) is a tool for managing resources effectively. After reviewing some concepts and principles for effective data management, Hanson clearly applies the concepts to nurse staffing systems, which manage human resources. He defines a seven-step process for establishing an MIS, from defining the management objective to implementing the system. Pointing out that an MIS need not be computerized to be effective, Hanson presents a positive perspective and clarifies some often-misconceived notions about management information systems and the paper printouts they generate. In the next issue of JONA, a second article by Hanson will take a more detailed look at the variety, use, and usefulness of staffing statistics available from an MIS for staffing. These articles are based on material in a forthcoming book, Management Systems for Nursing Service Staffing, to be published by Aspen Systems Corporation, Rockville, Maryland.

  20. Successful Principles for Collaboration: Formation of the IAIMS Consortium.

    ERIC Educational Resources Information Center

    Stead, William W.; And Others

    1991-01-01

    Six universities collaborated in developing an integrated academic information management system (IAIMS) to manage data and information as a shared resource and to bring together resources for timely decision making. The program assists institutions in linking their library systems and other information systems to support education, research,…

  1. On the management and processing of earth resources information

    NASA Technical Reports Server (NTRS)

    Skinner, C. W.; Gonzalez, R. C.

    1973-01-01

    The basic concepts of a recently completed large-scale earth resources information system plan are reported. Attention is focused throughout the paper on the information management and processing requirements. After the development of the principal system concepts, a model system for implementation at the state level is discussed.

  2. Job Management Requirements for NAS Parallel Systems and Clusters

    NASA Technical Reports Server (NTRS)

    Saphir, William; Tanner, Leigh Ann; Traversat, Bernard

    1995-01-01

    A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

  3. Quicker, slicker, and better? An evaluation of a web-based human resource management system

    NASA Astrophysics Data System (ADS)

    Gibb, Stephen; McBride, Andrew

    2001-10-01

    This paper reviews the design and development of a web based Human Resource Management (HRM) system which has as its foundation a 'capability profiler' tool for analysing individual or team roles in organisations. This provides a foundation for managing a set of integrated activities in recruitment and selection, performance and career management, and training and development for individuals, teams, and whole organisations. The challenges of representing and processing information about the human side of organisation encountered in the design and implementation of such systems are evident. There is a combination of legal, practical, technical and philosophical issues to be faced in the processes of defining roles, selecting staff, monitoring and managing the performance of employees in the design and implementation of such systems. The strengths and weaknesses of web based systems in this context are evaluated. This evaluation highlights both the potential, given the evolution of broader Enterprise Resource Planning (ERP) systems and strategies in manufacturing, and concerns about the migration of HRM processes to such systems.

  4. Science, education and industry information resources complementarity as a basis for design of knowledge management systems

    NASA Astrophysics Data System (ADS)

    Maksimov, N. V.; Tikhomirov, G. V.; Golitsyna, O. L.

    2017-01-01

    The main problems and circumstances that influence the processes of creating effective knowledge management systems were described. These problems particularly include high species diversity of instruments for knowledge representation, lack of adequate lingware, including formal representation of semantic relationships. For semantic data descriptions development a conceptual model of the subject area and a conceptual-lexical system should be designed on proposals of ISO-15926 standard. It is proposed to conduct an information integration of educational and production processes on the basis of information systems technologies. Integrated knowledge management system information environment combines both traditional information resources and specific information resources of subject domain including task context and implicit/tacit knowledge.

  5. An integrated GIS/remote sensing data base in North Cache soil conservation district, Utah: A pilot project for the Utah Department of Agriculture's RIMS (Resource Inventory and Monitoring System)

    NASA Technical Reports Server (NTRS)

    Wheeler, D. J.; Ridd, M. K.; Merola, J. A.

    1984-01-01

    A basic geographic information system (GIS) for the North Cache Soil Conservation District (SCD) was sought for selected resource problems. Since the resource management issues in the North Cache SCD are very complex, it is not feasible in the initial phase to generate all the physical, socioeconomic, and political baseline data needed for resolving all management issues. A selection of critical varables becomes essential. Thus, there are foud specific objectives: (1) assess resource management needs and determine which resource factors ae most fundamental for building a beginning data base; (2) evaluate the variety of data gathering and analysis techniques for the resource factors selected; (3) incorporate the resulting data into a useful and efficient digital data base; and (4) demonstrate the application of the data base to selected real world resoource management issues.

  6. Integrated Forecast-Decision Systems For River Basin Planning and Management

    NASA Astrophysics Data System (ADS)

    Georgakakos, A. P.

    2005-12-01

    A central application of climatology, meteorology, and hydrology is the generation of reliable forecasts for water resources management. In principle, effective use of forecasts could improve water resources management by providing extra protection against floods, mitigating the adverse effects of droughts, generating more hydropower, facilitating recreational activities, and minimizing the impacts of extreme events on the environment and the ecosystems. In practice, however, realization of these benefits depends on three requisite elements. First is the skill and reliability of forecasts. Second is the existence of decision support methods/systems with the ability to properly utilize forecast information. And third is the capacity of the institutional infrastructure to incorporate the information provided by the decision support systems into the decision making processes. This presentation discusses several decision support systems (DSS) using ensemble forecasting that have been developed by the Georgia Water Resources Institute for river basin management. These DSS are currently operational in Africa, Europe, and the US and address integrated water resources and energy planning and management in river basins with multiple water uses, multiple relevant temporal and spatial scales, and multiple decision makers. The article discusses the methods used and advocates that the design, development, and implementation of effective forecast-decision support systems must bring together disciplines, people, and institutions necessary to address today's complex water resources challenges.

  7. Summary of Research 1997 Department of Systems Management.

    DTIC Science & Technology

    1999-01-01

    formulation and execution; impacts of budget allocation , reallocation, and reduction; imple- mentation of Defense Resource Management Systems; and the...flexible structure that can be applied to a wide range of resource allocation problems. PUBLICATIONS: Dolk, D., Murphy, M., and Thomas, G...policies, procedures, and rationale in deter- mining recruiting resource allocation decisions. The methodology relies on a review of the literature

  8. Information Resources Management. Nordic Conference on Information and Documentation (6th, Helsinki, Finland, August 19-22, 1985).

    ERIC Educational Resources Information Center

    Samfundet for Informationstjanst i Finland, Helsinki.

    The 54 conference papers compiled in this proceedings include plenary addresses; reviews of Nordic databases; and discussions of documents, systems, services, and products as they relate to information resources management (IRM). Almost half of the presentations are in English: (1) "What Is Information Resources Management?" (Forest…

  9. Bayesian belief networks: applications in ecology and natural resource management.

    Treesearch

    R.K. McCann; B.G. Marcot; R. Ellis

    2006-01-01

    We review the use of Bayesian belief networks (BBNs) in natural resource management and ecology. We suggest that BBNs are useful tools for representing expert knowledge of a system, evaluating potential effects of alternative management decisions, and communicating to nonexperts about resource decision issues. BBNs can be used effectively to represent uncertainty in...

  10. Managing Senegalese water resources: Definition and relative importance of information needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engi, D.

    1998-09-01

    This report provides an overview of the results of the Vital Issues process as implemented for the Senegal Water Resources Management Initiative, a collaborative effort between the Senegalese Ministry of Water Resources and Sandia National Laboratories. This Initiative is being developed to assist in the development of an efficient and sustainable water resources management system for Senegal. The Vital Issues process was used to provide information for the development of a proposal that will recommend actions to address the key management issues and establish a state-of-the-art decision support system (DSS) for managing Senegal`s water resources. Three Vital Issues panel meetingsmore » were convened to (1) develop a goal statement and criteria for identifying and ranking the issues vital to water resources management in Senegal; (2) define and rank the issues, and (3) identify and prioritize a preliminary list of information needed to address the vital issues. The selection of panelists from the four basic institutional perspectives (government, industry, academe, and citizens` interest groups) ensured a high level of stakeholder representation on the panels.« less

  11. Resources planning for radiological incidents management

    NASA Astrophysics Data System (ADS)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  12. Penny Burton - Chief Human Resources Officer | NREL

    Science.gov Websites

    Penny Burton - Chief Human Resources Officer Penny Burton - Chief Human Resources Officer A photo of Penny Burton. As chief human resources officer, Penny Burton is responsible for development of a human capital management system to more effectively manage NREL's workforce, all while achieving

  13. TERSSE. Definition of the total earth resources system for the shuttle era. Volume 10: (TOSS) TERSSE operational system study

    NASA Technical Reports Server (NTRS)

    Stow, W. K.; Cheeseman, C.; Dallam, W.; Dietrich, D.; Dorfman, G.; Fleming, R.; Fries, R.; Guard, W.; Jackson, F.; Jankowski, H.

    1975-01-01

    Economic benefits studies regarding the application of remote sensing to resource management and the Total Earth Resources for the Shuttle Era (TERSSE) study to outline the structure and development of future systems are used, along with experience from LANDSAT and LACIE, to define the system performance and economics of an operational Earth Resources system. The system is to be based on current (LANDSAT follow-on) technology and its application to high priority resource management missions, such as global crop inventory. The TERSSE Operational System Study (TOSS) investigated system-level design alternatives using economic performance as the evaluation criterion. As such, the TOSS effort represented a significant step forward in the systems engineering and economic analysis of Earth Resources programs. By parametrically relating engineering design parameters, such as sensor performance details, to the economic benefit mechanisms a new level of confidence in the conclusions concerning the implementation of such systems can be reached.

  14. Information systems for the materials management department: stand-alone and enterprise resource planning systems.

    PubMed

    2005-03-01

    Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.

  15. A clinical economics workstation for risk-adjusted health care cost management.

    PubMed Central

    Eisenstein, E. L.; Hales, J. W.

    1995-01-01

    This paper describes a healthcare cost accounting system which is under development at Duke University Medical Center. Our approach differs from current practice in that this system will dynamically adjust its resource usage estimates to compensate for variations in patient risk levels. This adjustment is made possible by introducing a new cost accounting concept, Risk-Adjusted Quantity (RQ). RQ divides case-level resource usage variances into their risk-based component (resource consumption differences attributable to differences in patient risk levels) and their non-risk-based component (resource consumption differences which cannot be attributed to differences in patient risk levels). Because patient risk level is a factor in estimating resource usage, this system is able to simultaneously address the financial and quality dimensions of case cost management. In effect, cost-effectiveness analysis is incorporated into health care cost management. PMID:8563361

  16. Dynamic Risk Quantification and Management: Core needs and strategies for adapting water resources systems to a changing environment (Invited)

    NASA Astrophysics Data System (ADS)

    Lall, U.

    2009-12-01

    The concern with anthropogenic climate change has spurred significant interest in strategies for climate change adaptation in water resource systems planning and management. The thesis of this talk is that this is a subset of strategies that need to sustainably design and operate structural and non-structural systems for managing resources in a changing environment. Even with respect to a changing climate, the largest opportunity for immediate adaptation to a changing climate may be provided by an improved understanding and prediction capability for seasonal to interannual and decadal climate variability. I shall lay out some ideas as to how this can be done and provide an example for reservoir water allocation and management, and one for flood risk management.

  17. Toward A Science of Sustainable Water Management

    NASA Astrophysics Data System (ADS)

    Brown, C.

    2016-12-01

    Societal need for improved water management and concerns for the long-term sustainability of water resources systems are prominent around the world. The continued susceptibility of society to the harmful effects of hydrologic variability, pervasive concerns related to climate change and the emergent awareness of devastating effects of current practice on aquatic ecosystems all illustrate our limited understanding of how water ought to be managed in a dynamic world. The related challenges of resolving the competition for freshwater among competing uses (so called "nexus" issues) and adapting water resources systems to climate change are prominent examples of the of sustainable water management challenges. In addition, largely untested concepts such as "integrated water resources management" have surfaced as Sustainable Development Goals. In this presentation, we argue that for research to improve water management, and for practice to inspire better research, a new focus is required, one that bridges disciplinary barriers between the water resources research focus on infrastructure planning and management, and the role of human actors, and geophysical sciences community focus on physical processes in the absence of dynamical human response. Examples drawn from climate change adaptation for water resource systems and groundwater management policy provide evidence of initial progress towards a science of sustainable water management that links improved physical understanding of the hydrological cycle with the socioeconomic and ecological understanding of water and societal interactions.

  18. The VTIE telescope resource management system

    NASA Astrophysics Data System (ADS)

    Busschots, B.; Keating, J. G.

    2005-06-01

    The VTIE Telescope Resource Management System (TRMS) provides a frame work for managing a distributed group of internet telescopes as a single "Virtual Observatory". The TRMS provides hooks which allow for it to be connected to any Java Based web portal and for a Java based scheduler to be added to it. The TRMS represents each telescope and observatory in the system with a software agent and then allows the scheduler and web portal to communicate with these distributed resources in a simple transparent way, hence allowing the scheduler and portal designers to concentrate only on what they wish to do with these resources rather than how to communicate with them. This paper outlines the structure and implementation of this frame work.

  19. 76 FR 40338 - National Estuarine Research Reserve System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Reserve System AGENCY: Estuarine Reserves Division, Office of Ocean and Coastal Resource Management.... SUMMARY: The Estuarine Reserves Division, Office of Ocean and Coastal Resource Management, National Ocean... support reserve operations. The objectives described in this plan address the most critical coastal issues...

  20. Managing Tomorrow's University.

    ERIC Educational Resources Information Center

    Michalak, Craig L., Ed.

    The issues addressed in this conference report concern budgeting, the resourceful manager, extramural funding, employer-employee interaction, management information systems, and management of the university in the future. Contents include: the keynote address by F. E. Balderston; "University Budgeting in an Era of Scarce Resources," by F. M. Bowen…

  1. RIMS: Resource Information Management System

    NASA Technical Reports Server (NTRS)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  2. The Human Resource Cycle as Basis of Human Resource Development System.

    ERIC Educational Resources Information Center

    Jereb, Janez

    The primary aim of human-resource-development systems in companies is to improve organizational performance through satisfying the development needs of individual employees. This paper presents findings of a study that looked at how human-resource-development systems worked in practice, in particular, how performance management, selection,…

  3. The U.S. Army Corps of Engineers recreation resource management challenges

    Treesearch

    Gerald T. Purvis

    1980-01-01

    This paper provides a brief legislative history of Corps responsibilities for public recreation, outlines its relationships with non-federal agencies and organizations and describes a number of environmental concerns it sees in its new outlook for management of recreation resources. A Recreation- Resource Management System is also described that contains data on the...

  4. Resource effects on solitary bee reproduction in a managed crop pollination system

    USDA-ARS?s Scientific Manuscript database

    The number of solitary bees (Megachile rotundata) released for pollination in a managed system (Medicago sativa seed production) and the number of flowers available for brood provisioning may affect reproduction through maternal resource allocation and investment. Overwhelming, limited, or adequate...

  5. Proceedings of the National Conference on Energy Resource Management. Volume 2: Applications

    NASA Technical Reports Server (NTRS)

    Brumfield, J. O. (Editor); Schiffman, Y. M. (Editor)

    1982-01-01

    Subject areas related to the integration of remotely sensed data with geographic information systems for application in energy resource management are covered. The current trends and advances in the application of these systems to a number of energy concerns are addressed.

  6. 5 CFR 9701.404 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF... MANAGEMENT SYSTEM Performance Management § 9701.404 Definitions. In this subpart— Appraisal means the review... under a performance management system for reviewing employee performance. Competencies means the...

  7. 5 CFR 9701.404 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF... MANAGEMENT SYSTEM Performance Management § 9701.404 Definitions. In this subpart— Appraisal means the review... under a performance management system for reviewing employee performance. Competencies means the...

  8. 5 CFR 9701.404 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF... MANAGEMENT SYSTEM Performance Management § 9701.404 Definitions. In this subpart— Appraisal means the review... under a performance management system for reviewing employee performance. Competencies means the...

  9. Devolving HRM and HRD to Line managers: The Case of Hilton International's UK Hotels

    ERIC Educational Resources Information Center

    Maxwell, Gillian; Watson, Sandra

    2004-01-01

    This paper explores line manager responsibility for human resource management (HRM) and human resource development (HRD) in an international hotel organisation. The results identify a strong support system for line managers in relation to training and good relations with HR specialists. However, less evident is senior management support coupled…

  10. SLURM: Simple Linux Utility for Resource Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jette, M; Grondona, M

    2002-12-19

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, scheduling and stream copy modules. This paper presents an overview of the SLURM architecture and functionality.

  11. SLURM: Simplex Linux Utility for Resource Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jette, M; Grondona, M

    2003-04-22

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, scheduling, and stream copy modules. This paper presents an overview of the SLURM architecture and functionality.

  12. Resource Allocation Procedure at Queensland University: A Dynamic Modelling Project.

    ERIC Educational Resources Information Center

    Galbraith, Peter L.; Carss, Brian W.

    A structural reorganization of the University of Queensland, Australia, was undertaken to promote efficient resource management, and a resource allocation model was developed to aid in policy evaluation and planning. The operation of the restructured system was based on creating five resource groups to manage the distribution of academic resources…

  13. Management of prostate cancer in Asia: resource-stratified guidelines from the Asian Oncology Summit 2013.

    PubMed

    Williams, Scott; Chiong, Edmund; Lojanapiwat, Bannakij; Umbas, Rainy; Akaza, Hideyuki

    2013-11-01

    Many local and systemic options for prostate cancer have emerged in recent years, but existing management guidelines do not account for diversity in health resources between different countries. We present recommendations for the management of prostate cancer, stratified according to the extent of resource availability-based on a four-tier system of basic, limited, enhanced, and maximum resources-to enable applicability to Asian countries with differing levels of health-care resources. This statement of recommendations was formulated by a multidisciplinary panel from Asia-Pacific countries, at a consensus session on prostate cancer that was held as part of the 2013 Asian Oncology Summit in Bangkok, Thailand. Copyright © 2013 Elsevier Ltd. All rights reserved.

  14. Resource Tracking Model Updates and Trade Studies

    NASA Technical Reports Server (NTRS)

    Chambliss, Joe; Stambaugh, Imelda; Moore, Michael

    2016-01-01

    The Resource Tracking Model has been updated to capture system manager and project manager inputs. Both the Trick/General Use Nodal Network Solver Resource Tracking Model (RTM) simulator and the RTM mass balance spreadsheet have been revised to address inputs from system managers and to refine the way mass balance is illustrated. The revisions to the RTM included the addition of a Plasma Pyrolysis Assembly (PPA) to recover hydrogen from Sabatier Reactor methane, which was vented in the prior version of the RTM. The effect of the PPA on the overall balance of resources in an exploration vehicle is illustrated in the increased recycle of vehicle oxygen. Case studies have been run to show the relative effect of performance changes on vehicle resources.

  15. 23 CFR 970.214 - Federal lands congestion management system (CMS).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... LANDS HIGHWAYS NATIONAL PARK SERVICE MANAGEMENT SYSTEMS National Park Service Management Systems § 970... value (protection/rejuvenation of resources, improved visitor experience) to the park and adjacent...

  16. 23 CFR 970.214 - Federal lands congestion management system (CMS).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... LANDS HIGHWAYS NATIONAL PARK SERVICE MANAGEMENT SYSTEMS National Park Service Management Systems § 970... value (protection/rejuvenation of resources, improved visitor experience) to the park and adjacent...

  17. 5 CFR 9901.404 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM...-for-performance evaluation system means the performance management system established under this...

  18. Enhancing Learning while Creating a Library Presence in Course Management Systems

    ERIC Educational Resources Information Center

    Mairn, Chad

    2010-01-01

    Web 2.0 has made information more accessible and offers opportunities to make library resources more visible. This article presents several strategies for incorporating libraries and library resources into Web sites and course management systems. The tools presented are appropriate for many types of libraries and work with most Web-based systems.…

  19. Simulation analysis of a wildfire suppression system

    Treesearch

    Abílio Pereira Pacheco; João Claro; Tiago Oliveira

    2013-01-01

    Rekindles and false alarms are unusually high in the Portuguese wildfire management system, representing a high burden on suppression resources in particular, and fire management resources in general. In 20,049 occurrences that the suppression system handled in the summer of 2010, 12.5% were false alarms and 15.0% were rekindles. We present a discreteevent simulation...

  20. Implementation of a Shared Resource Financial Management System

    PubMed Central

    Caldwell, T.; Gerlach, R.; Israel, M.; Bobin, S.

    2010-01-01

    CF-6 Norris Cotton Cancer Center (NCCC), an NCI-designated Comprehensive Cancer Center at Dartmouth Medical School, administers 12 Life Sciences Shared Resources. These resources are diverse and offer multiple products and services. Previous methods for tracking resource use, billing, and financial management were time consuming, error prone and lacked appropriate financial management tools. To address these problems, we developed and implemented a web-based application with a built-in authorization system that uses Perl, ModPerl, Apache2, and Oracle as the software infrastructure. The application uses a role-based system to differentiate administrative users with those requesting services and includes many features requested by users and administrators. To begin development, we chose a resource that had an uncomplicated service, a large number of users, and required the use of all of the applications features. The Molecular Biology Core Facility at NCCC fit these requirements and was used as a model for developing and testing the application. After model development, institution wide deployment followed a three-stage process. The first stage was to interview the resource manager and staff to understand day-to-day operations. At the second stage, we generated and tested customized forms defining resource services. During the third stage, we added new resource users and administrators to the system before final deployment. Twelve months after deployment, resource administrators reported that the new system performed well for internal and external billing and tracking resource utilization. Users preferred the application's web-based system for distribution of DNA sequencing and other data. The sample tracking features have enhanced day-to-day resource operations, and an on-line scheduling module for shared instruments has proven a much-needed utility. Principal investigators now are able to restrict user spending to specific accounts and have final approval of the invoices before the billing, which has significantly reduced the number of unpaid invoices.

  1. Coastal resource complexes of South India: options for sustainable management.

    PubMed

    Damodaran, A

    2006-04-01

    India's coastal resource complexes were traditionally characterized by a continuum of 'common property resources' or 'commons' that stretched from the shores to the seas. The continuum aided the existence of sustainable livelihood systems for local communities. Today, fragmented policy approaches and economic welfare schemes have caused the disintegration of community control over the continuum. As a consequence, livelihood systems of local communities have declined. The introduction of coastal management guidelines in the 1990s has exacerbated the situation. With reference to a coastal village located in the State of Kerala in South West India, the paper describes the trajectory of unsustainable change that has taken place in the coastal area resource complexes of the country. The paper argues for restoring the continuum of commons in the study area through community driven systems of natural resource management that are based on networks of nested institutions.

  2. Management Guide to the Protection of Information Resources.

    ERIC Educational Resources Information Center

    Helsing, Cheryl; And Others

    This guide introduces information systems security concerns and outlines the issues that must be addressed by all agency managers in meeting their responsibilities to protect information systems within their organizations. It describes the essential components of an effective information resource protection process that applies to an individual…

  3. 5 CFR 9901.223 - Appeal to DoD for review of classification decisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Classification Classification Process § 9901... process. (1) Employee appeals to DoD must be submitted through the employee's servicing Human Resources...

  4. Right place of human resource management in the reform of health sector.

    PubMed

    Hassani, Seyed Abas; Mobaraki, Hossein; Bayat, Maboubeh; Mafimoradi, Shiva

    2013-01-01

    In this paper the real role and place of human resource (HR) in health system reform will be discussed and determined within the whole system through the comprehensive Human Resource Management (HRM) model. Delphi survey and a questionnaire were used to 1) collect HR manager ideas and comments and 2) identify the main challenges of HRM. Then the results were discussed in an expert panel after being analyzed by content analysis method. Also, a deep focus study of recorded documents related to Health Human Resource Management was done. Then based on all achieved results, a rich picture was drawn to illustrate the right place of HRM in health sector. Finally, the authors revitalize the missed function of HRM within the health sector by drawing a holistic conceptual model. The most percentage of frequency about HR belongs to "Lack of reliable HR information system" (91%) and the least percentage of frequency belongs to "Low responsibility of HR" (28%). The most percentage of frequency about HR manager belongs to "Inattention to HR managers as key managers and consider them in background" (80%) and the least percentage of frequency belongs to "Lack of coordination between universities' policies" (30%). According to the conceptual framework, human resources employed in health system are viewed from two comprehensive approaches: instrumental approach and institutional. Unlike the common belief that looks HRM through the supportive approach, it is discussed that HRM not only has an instrumental role, but also do have a driver role.

  5. [Research on the Application of Lean Management in Medical Consumables Material Logistics Management].

    PubMed

    Yang, Chai; Zhang, Wei; Gu, Wei; Shen, Aizong

    2016-11-01

    Solve the problems of high cost, low utilization rate of resources, low medical care quality problem in medical consumables material logistics management for scientific of medical consumables management. Analysis of the problems existing in the domestic medical consumables material logistics management in hospital, based on lean management method, SPD(Supply, Processing, Distribution) for specific applications, combined HBOS(Hospital Business Operation System), HIS (Hospital Information System) system for medical consumables material management. Achieve the lean management in medical consumables material purchase, warehouse construction, push, clinical use and retrospect. Lean management in medical consumables material can effectively control the cost in logistics management, optimize the alocation of resources, liberate unnecessary time of medical staff, improve the quality of medical care. It is a scientific management method.

  6. Solving Large-scale Spatial Optimization Problems in Water Resources Management through Spatial Evolutionary Algorithms

    NASA Astrophysics Data System (ADS)

    Wang, J.; Cai, X.

    2007-12-01

    A water resources system can be defined as a large-scale spatial system, within which distributed ecological system interacts with the stream network and ground water system. Water resources management, the causative factors and hence the solutions to be developed have a significant spatial dimension. This motivates a modeling analysis of water resources management within a spatial analytical framework, where data is usually geo- referenced and in the form of a map. One of the important functions of Geographic information systems (GIS) is to identify spatial patterns of environmental variables. The role of spatial patterns in water resources management has been well established in the literature particularly regarding how to design better spatial patterns for satisfying the designated objectives of water resources management. Evolutionary algorithms (EA) have been demonstrated to be successful in solving complex optimization models for water resources management due to its flexibility to incorporate complex simulation models in the optimal search procedure. The idea of combining GIS and EA motivates the development and application of spatial evolutionary algorithms (SEA). SEA assimilates spatial information into EA, and even changes the representation and operators of EA. In an EA used for water resources management, the mathematical optimization model should be modified to account the spatial patterns; however, spatial patterns are usually implicit, and it is difficult to impose appropriate patterns to spatial data. Also it is difficult to express complex spatial patterns by explicit constraints included in the EA. The GIS can help identify the spatial linkages and correlations based on the spatial knowledge of the problem. These linkages are incorporated in the fitness function for the preference of the compatible vegetation distribution. Unlike a regular GA for spatial models, the SEA employs a special hierarchical hyper-population and spatial genetic operators to represent spatial variables in a more efficient way. The hyper-population consists of a set of populations, which correspond to the spatial distributions of the individual agents (organisms). Furthermore spatial crossover and mutation operators are designed in accordance with the tree representation and then applied to both organisms and populations. This study applies the SEA to a specific problem of water resources management- maximizing the riparian vegetation coverage in accordance with the distributed groundwater system in an arid region. The vegetation coverage is impacted greatly by the nonlinear feedbacks and interactions between vegetation and groundwater and the spatial variability of groundwater. The SEA is applied to search for an optimal vegetation configuration compatible to the groundwater flow. The results from this example demonstrate the effectiveness of the SEA. Extension of the algorithm for other water resources management problems is discussed.

  7. Adaptive Management of Computing and Network Resources for Spacecraft Systems

    NASA Technical Reports Server (NTRS)

    Pfarr, Barbara; Welch, Lonnie R.; Detter, Ryan; Tjaden, Brett; Huh, Eui-Nam; Szczur, Martha R. (Technical Monitor)

    2000-01-01

    It is likely that NASA's future spacecraft systems will consist of distributed processes which will handle dynamically varying workloads in response to perceived scientific events, the spacecraft environment, spacecraft anomalies and user commands. Since all situations and possible uses of sensors cannot be anticipated during pre-deployment phases, an approach for dynamically adapting the allocation of distributed computational and communication resources is needed. To address this, we are evolving the DeSiDeRaTa adaptive resource management approach to enable reconfigurable ground and space information systems. The DeSiDeRaTa approach embodies a set of middleware mechanisms for adapting resource allocations, and a framework for reasoning about the real-time performance of distributed application systems. The framework and middleware will be extended to accommodate (1) the dynamic aspects of intra-constellation network topologies, and (2) the complete real-time path from the instrument to the user. We are developing a ground-based testbed that will enable NASA to perform early evaluation of adaptive resource management techniques without the expense of first deploying them in space. The benefits of the proposed effort are numerous, including the ability to use sensors in new ways not anticipated at design time; the production of information technology that ties the sensor web together; the accommodation of greater numbers of missions with fewer resources; and the opportunity to leverage the DeSiDeRaTa project's expertise, infrastructure and models for adaptive resource management for distributed real-time systems.

  8. 77 FR 77121 - Hispanic Council on Federal Employment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    .... Reviewing leading practices in strategic human resources management planning; b. Providing advice on ways to... technical expertise regarding strategic human resources management planning and the merit systems principles... OFFICE OF PERSONNEL MANAGEMENT Hispanic Council on Federal Employment AGENCY: Office of Personnel...

  9. 5 CFR 9701.516 - Allotments to representatives.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Allotments to representatives. 9701.516 Section 9701.516 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.516 Allotments to representatives...

  10. Utilizing an Energy Management System with Distributed Resources to Manage Critical Loads and Reduce Energy Costs

    DTIC Science & Technology

    2014-09-01

    peak shaving, conducting power factor correction, matching critical load to most efficient distributed resource, and islanding a system during...photovoltaic arrays during islanding, and power factor correction, the implementation of the ESS by itself is likely to prove cost prohibitive. The DOD...These functions include peak shaving, conducting power factor correction, matching critical load to most efficient distributed resource, and islanding a

  11. Coronado National Forest Draft Land and Resource Management Plan: Cochise, Graham, Pima, Pinal, and Santa Cruz Counties, Arizona, and Hidalgo County, New Mexico

    Treesearch

    Terry Austin; Yolynda Begay; Sharon Biedenbender; Rachael Biggs; Erin Boyle; Eli Curiel; Sarah Davis; Sara Dechter; Tami Emmett; Mary Farrell; Richard Gerhart; William Gillespie; Polly Haessig; Ed Holloway; Melissa Jenkins; Larry Jones; Debby Kriegel; Robert Lefevre; Mark Stamer; Mindi Lehew; Ann Lynch; George McKay; Linda Peery; Albert Peralta; Jennifer Ruyle; Jeremy Sautter; Kenna Schoenle; Salek Shafiqullah; Christopher Stetson; Mindi Sue Vogel; Laura White; Craig Wilcox; Judy York

    2013-01-01

    The Coronado National Forest is an administrative component of the National Forest System. It administers 1,783,639 acres of National Forest System lands. National forests across the United States were established to provide natural resource-based goods and services to American citizens, and to protect timber and watershed resources. Management of national forests is...

  12. Program Manager: Journal of the Defense Systems Management College. Volume 18, Number 3, May-June 1989

    DTIC Science & Technology

    1989-06-01

    Measurable goals and milestones are supported by action plans which include underlying assumptions, allocation of respon- sibility, resource ...military reasons developments to the relationship be- vironmental laws? for starting where he did. To tween hardware and the environment. Responsibility...supporting integrated testing understanding of the concerns of the - Managing test resources military services and which would set - Evaluating system

  13. Remote Sensing of Soils for Environmental Assessment and Management.

    NASA Technical Reports Server (NTRS)

    DeGloria, Stephen D.; Irons, James R.; West, Larry T.

    2014-01-01

    The next generation of imaging systems integrated with complex analytical methods will revolutionize the way we inventory and manage soil resources across a wide range of scientific disciplines and application domains. This special issue highlights those systems and methods for the direct benefit of environmental professionals and students who employ imaging and geospatial information for improved understanding, management, and monitoring of soil resources.

  14. Design research about coastal zone planning and management information system based on GIS and database technologies

    NASA Astrophysics Data System (ADS)

    Huang, Pei; Wu, Sangyun; Feng, Aiping; Guo, Yacheng

    2008-10-01

    As littoral areas in possession of concentrated population, abundant resources, developed industry and active economy, the coastal areas are bound to become the forward positions and supported regions for marine exploitation. In the 21st century, the pressure that coastal zones are faced with is as follows: growth of population and urbanization, rise of sea level and coastal erosion, shortage of freshwater resource and deterioration of water resource, and degradation of fishery resource and so on. So the resources of coastal zones should be programmed and used reasonably for the sustainable development of economy and environment. This paper proposes a design research on the construction of coastal zone planning and management information system based on GIS and database technologies. According to this system, the planning results of coastal zones could be queried and displayed expediently through the system interface. It is concluded that the integrated application of GIS and database technologies provides a new modern method for the management of coastal zone resources, and makes it possible to ensure the rational development and utilization of the coastal zone resources, along with the sustainable development of economy and environment.

  15. GRIN-Global: An International Project to Develop a Global Plant Genebank and Information Management System

    USDA-ARS?s Scientific Manuscript database

    Many of the world's national genebanks, responsible for the safeguarding and availability of their country's Plant Genetic Resource (PGR) collections, have lacked access to high quality IT needed to document and manage their collections electronically. The Germplasm Resource Information System (GRI...

  16. System complexity as a measure of safe capacity for the emergency department.

    PubMed

    France, Daniel J; Levin, Scott

    2006-11-01

    System complexity is introduced as a new measure of system state for the emergency department (ED). In its original form, the measure quantifies the uncertainty of demands on system resources. For application in the ED, the measure is being modified to quantify both workload and uncertainty to produce a single integrated measure of system state. Complexity is quantified using an information-theoretic or entropic approach developed in manufacturing and operations research. In its original form, complexity is calculated on the basis of four system parameters: 1) the number of resources (clinicians and processing entities such as radiology and laboratory systems), 2) the number of possible work states for each resource, 3) the probability that a resource is in a particular work state, and 4) the probability of queue changes (i.e., where a queue is defined by the number of patients or patient orders being managed by a resource) during a specified time period. An example is presented to demonstrate how complexity is calculated and interpreted for a simple system composed of three resources (i.e., emergency physicians) managing varying patient loads. The example shows that variation in physician work states and patient queues produces different scores of complexity for each physician. It also illustrates how complexity and workload differ. System complexity is a viable and technically feasible measurement for monitoring and managing surge capacity in the ED.

  17. 78 FR 56730 - Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Management Area boundary determination; Travel management system to accommodate many uses while maintaining... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCOS06000 L12200000.DP0000] Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare an Associated...

  18. 5 CFR 9901.405 - Performance management system requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Performance management system requirements. 9901.405 Section 9901.405 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF...

  19. Knowledge and information management for integrated water resource management

    USDA-ARS?s Scientific Manuscript database

    Watershed information systems that integrate data and analytical tools are critical enabling technologies to support Integrated Water Resource Management (IWRM) by converting data into information, and information into knowledge. Many factors bring people to the table to participate in an IWRM fra...

  20. 5 CFR 9701.506 - Impact on existing agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Impact on existing agreements. 9701.506 Section 9701.506 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.506 Impact on existing agreements...

  1. Advanced Grid Control Technologies Workshop Series | Energy Systems

    Science.gov Websites

    on advanced distribution management systems (ADMS) and microgrid controls. The workshops were held at . July 7, 2015: Advanced Distribution Management Systems (ADMS) Welcome and NREL Overview Dr. Murali Keynote: Next-Generation Distribution Management Systems and Distributed Resource Energy Management

  2. Workflow Management Systems for Molecular Dynamics on Leadership Computers

    NASA Astrophysics Data System (ADS)

    Wells, Jack; Panitkin, Sergey; Oleynik, Danila; Jha, Shantenu

    Molecular Dynamics (MD) simulations play an important role in a range of disciplines from Material Science to Biophysical systems and account for a large fraction of cycles consumed on computing resources. Increasingly science problems require the successful execution of ''many'' MD simulations as opposed to a single MD simulation. There is a need to provide scalable and flexible approaches to the execution of the workload. We present preliminary results on the Titan computer at the Oak Ridge Leadership Computing Facility that demonstrate a general capability to manage workload execution agnostic of a specific MD simulation kernel or execution pattern, and in a manner that integrates disparate grid-based and supercomputing resources. Our results build upon our extensive experience of distributed workload management in the high-energy physics ATLAS project using PanDA (Production and Distributed Analysis System), coupled with recent conceptual advances in our understanding of workload management on heterogeneous resources. We will discuss how we will generalize these initial capabilities towards a more production level service on DOE leadership resources. This research is sponsored by US DOE/ASCR and used resources of the OLCF computing facility.

  3. A New Approach to Integrate Internet-of-Things and Software-as-a-Service Model for Logistic Systems: A Case Study

    PubMed Central

    Chen, Shang-Liang; Chen, Yun-Yao; Hsu, Chiang

    2014-01-01

    Cloud computing is changing the ways software is developed and managed in enterprises, which is changing the way of doing business in that dynamically scalable and virtualized resources are regarded as services over the Internet. Traditional manufacturing systems such as supply chain management (SCM), customer relationship management (CRM), and enterprise resource planning (ERP) are often developed case by case. However, effective collaboration between different systems, platforms, programming languages, and interfaces has been suggested by researchers. In cloud-computing-based systems, distributed resources are encapsulated into cloud services and centrally managed, which allows high automation, flexibility, fast provision, and ease of integration at low cost. The integration between physical resources and cloud services can be improved by combining Internet of things (IoT) technology and Software-as-a-Service (SaaS) technology. This study proposes a new approach for developing cloud-based manufacturing systems based on a four-layer SaaS model. There are three main contributions of this paper: (1) enterprises can develop their own cloud-based logistic management information systems based on the approach proposed in this paper; (2) a case study based on literature reviews with experimental results is proposed to verify that the system performance is remarkable; (3) challenges encountered and feedback collected from T Company in the case study are discussed in this paper for the purpose of enterprise deployment. PMID:24686728

  4. A new approach to integrate Internet-of-things and software-as-a-service model for logistic systems: a case study.

    PubMed

    Chen, Shang-Liang; Chen, Yun-Yao; Hsu, Chiang

    2014-03-28

    Cloud computing is changing the ways software is developed and managed in enterprises, which is changing the way of doing business in that dynamically scalable and virtualized resources are regarded as services over the Internet. Traditional manufacturing systems such as supply chain management (SCM), customer relationship management (CRM), and enterprise resource planning (ERP) are often developed case by case. However, effective collaboration between different systems, platforms, programming languages, and interfaces has been suggested by researchers. In cloud-computing-based systems, distributed resources are encapsulated into cloud services and centrally managed, which allows high automation, flexibility, fast provision, and ease of integration at low cost. The integration between physical resources and cloud services can be improved by combining Internet of things (IoT) technology and Software-as-a-Service (SaaS) technology. This study proposes a new approach for developing cloud-based manufacturing systems based on a four-layer SaaS model. There are three main contributions of this paper: (1) enterprises can develop their own cloud-based logistic management information systems based on the approach proposed in this paper; (2) a case study based on literature reviews with experimental results is proposed to verify that the system performance is remarkable; (3) challenges encountered and feedback collected from T Company in the case study are discussed in this paper for the purpose of enterprise deployment.

  5. Evaluation of effectiveness of information systems implementation in organization (by example of ERP-systems)

    NASA Astrophysics Data System (ADS)

    Demyanova, O. V.; Andreeva, E. V.; Sibgatullina, D. R.; Kireeva-Karimova, A. M.; Gafurova, A. Y.; Zakirova, Ch S.

    2018-05-01

    ERP in a modern enterprise information system allowed optimizing internal business processes, reducing production costs and increasing the attractiveness of enterprises for investors. It is an important component of success in the competition and an important condition for attracting investments in the key sector of the state. A vivid example of these systems are enterprise information systems using the methodology of ERP (Enterprise Resource Planning - enterprise resource planning). ERP is an integrated set of methods, processes, technologies and tools. It is based on: supply chain management; advanced planning and scheduling; sales automation; tool responsible for configuring; final resource planning; intelligence business; OLAP technology; block e- Commerce; management of product data. The main purpose of ERP systems is the automation of interrelated processes of planning, accounting and management in key areas of the company. ERP systems are automated systems that effectively address complex problems, including optimal allocation of business resources, ensuring quick and efficient delivery of goods and services to the consumer. Knowledge embedded in ERP systems provided enterprise-wide automation to introduce the activities of all functional departments of the company as a single complex system. At the level of quality estimates, most managers understand that the implementations of ERP systems is a necessary and useful procedure. Assessment of the effectiveness of the information systems implementation is relevant.

  6. Controlling Costs. Managing Resources Module. Operational Management Programme. Second Edition.

    ERIC Educational Resources Information Center

    Hayter, Roy

    This self-study unit focuses on managing resources--materials, equipment, personnel, money, energy, time, and information. The material is designed primarily for those in a supervisory or junior management position working within their company's policies and systems. The unit may be of value to the small business proprietor, as an introduction to…

  7. Assessing The Ecosystem Service Freshwater Production From An Integrated Water Resources Management Perspective. Case Study: The Tormes Water Resources System (Spain)

    NASA Astrophysics Data System (ADS)

    Momblanch, Andrea; Paredes-Arquiola, Javier; Andreu, Joaquín; Solera, Abel

    2014-05-01

    The Ecosystem Services are defined as the conditions and processes through which natural ecosystems, and the species that make them up, sustain and fulfil human life. A strongly related concept is the Integrated Water Resources Management. It is a process which promotes the coordinated development and management of water, land and related resources in order to maximise the resultant economic and social welfare in an equitable manner without compromising the sustainability of vital ecosystems. From these definitions, it is clear that in order to cover so many water management and ecosystems related aspects the use of integrative models is increasingly necessary. In this study, we propose to link a hydrologic model and a water allocation model in order to assess the Freshwater Production as an Ecosystem Service in anthropised river basins. First, the hydrological model allows determining the volume of water generated by each sub-catchment; that is, the biophysical quantification of the service. This result shows the relevance of each sub-catchment as a source of freshwater and how this could change if the land uses are modified. On the other hand, the water management model allocates the available water resources among the different water uses. Then, it is possible to provide an economic value to the water resources through the use of demand curves, or other economic concepts. With this second model, we are able to obtain the economical quantification of the Ecosystem Service. Besides, the influence of water management and infrastructures on the service provision can be analysed. The methodology is applied to the Tormes Water Resources System, in Spain. The software used are EVALHID and SIMGES, for hydrological and management aspects, respectively. Both models are included in the Decision Support System Shell AQUATOOL for water resources planning and management. A scenario approach is presented to illustrate the potential of the methodology, including the current state and some intervention scenarios.

  8. A General Water Resources Regulation Software System in China

    NASA Astrophysics Data System (ADS)

    LEI, X.

    2017-12-01

    To avoid iterative development of core modules in water resource normal regulation and emergency regulation and improve the capability of maintenance and optimization upgrading of regulation models and business logics, a general water resources regulation software framework was developed based on the collection and analysis of common demands for water resources regulation and emergency management. It can provide a customizable, secondary developed and extensible software framework for the three-level platform "MWR-Basin-Province". Meanwhile, this general software system can realize business collaboration and information sharing of water resources regulation schemes among the three-level platforms, so as to improve the decision-making ability of national water resources regulation. There are four main modules involved in the general software system: 1) A complete set of general water resources regulation modules allows secondary developer to custom-develop water resources regulation decision-making systems; 2) A complete set of model base and model computing software released in the form of Cloud services; 3) A complete set of tools to build the concept map and model system of basin water resources regulation, as well as a model management system to calibrate and configure model parameters; 4) A database which satisfies business functions and functional requirements of general water resources regulation software can finally provide technical support for building basin or regional water resources regulation models.

  9. 5 CFR 9701.313 - Homeland Security Compensation Committee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Overview of Pay System § 9701.313... Undersecretary for Management. The Compensation Committee has 14 members, including 4 officials of labor...

  10. Management accounting for advanced technological environments.

    PubMed

    Kaplan, R S

    1989-08-25

    Management accounting systems designed decades ago no longer provide timely, relevant information for companies in today's highly competitive environment. New operational control and performance measurement systems are recognizing the importance of direct measurement of quality, manufacturing lead times, flexibility, and customer responsiveness, as well as more accurate measures of the actual costs of consumed resources. Activity-based cost systems can assign the costs of indirect and support resources to the specific products and activities that benefit from these resources. Both operational control and activity-based systems represent new opportunities for improved managerial information in complex, technologically advanced environments.

  11. Incorporating permaculture and strategic management for sustainable ecological resource management.

    PubMed

    Akhtar, Faiza; Lodhi, Suleman A; Khan, Safdar Shah; Sarwar, Farhana

    2016-09-01

    Utilization of natural assets to the best efficient level without changing natural balance has become a critical issue for researchers as awareness on climate change takes central position in global debate. Conventional sustainable resource management systems are based on neoclassical economic approach that ignores the nature's pattern and therefore are not actually capable of sustainable management of resources. Environmentalists are lately advocating incorporation of Permaculture as holistic approach based on ethics, equitable interaction with eco-systems to obtain sustainability. The paper integrates philosophy of permaculture with strategic management frameworks to develop a pragmatic tool for policy development. The policy design tool augments management tasks by integrating recording of natural assets, monitoring of key performance indicators and integration of sectorial policies in real time, bringing out policy as a truly live document. The tool enhances the edifice process, balancing short term viewpoints and long term development to secure renewability of natural resources. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Dynamic resource allocation in a hierarchical multiprocessor system: A preliminary study

    NASA Technical Reports Server (NTRS)

    Ngai, Tin-Fook

    1986-01-01

    An integrated system approach to dynamic resource allocation is proposed. Some of the problems in dynamic resource allocation and the relationship of these problems to system structures are examined. A general dynamic resource allocation scheme is presented. A hierarchial system architecture which dynamically maps between processor structure and programs at multiple levels of instantiations is described. Simulation experiments were conducted to study dynamic resource allocation on the proposed system. Preliminary evaluation based on simple dynamic resource allocation algorithms indicates that with the proposed system approach, the complexity of dynamic resource management could be significantly reduced while achieving reasonable effective dynamic resource allocation.

  13. Pakistan's health management information system: health managers' perspectives.

    PubMed

    Qazi, Muhammad Suleman; Ali, Moazzam

    2009-01-01

    To explore the perceptions of health managers regarding Health Management Information System (HMIS), within their organizational setting and in the context of decentralization process in Pakistan. Owing to the importance of HMIS as a decision making tool and the dependency for its effectiveness on the field-managers who are the key stake holders, a qualitative research was planned to explore, understand, and describe the perceptions of health managers regarding HMIS within their organizational setting in Pakistan. The study was carried out in seven selected districts in all provinces of Pakistan. The strengths highlighted were the sustainability of system even after suspension of funds from donors; vast coverage of over ten thousand health facilities, logistics and drug support systems. The weaknesses included scarcity of resources (i.e. skilled personnel and financial resources), contentious quality and underutilization of data; lack of motivation and feedback among health managers. There is a need to instigate organizational development and institutional strengthening initiatives. These may include defining the structure of organizations; specifying the roles, responsibilities and defining a career structure; managing resources; overhauling the training activity, right from needs assessment to evaluation; creating sense of responsibility; motivating the staff; giving incentives for good work and inculcating work ethics.

  14. An examination of the potential applications of automatic classification techniques to Georgia management problems

    NASA Technical Reports Server (NTRS)

    Rado, B. Q.

    1975-01-01

    Automatic classification techniques are described in relation to future information and natural resource planning systems with emphasis on application to Georgia resource management problems. The concept, design, and purpose of Georgia's statewide Resource AS Assessment Program is reviewed along with participation in a workshop at the Earth Resources Laboratory. Potential areas of application discussed include: agriculture, forestry, water resources, environmental planning, and geology.

  15. Toward interactive scheduling systems for managing medical resources.

    PubMed

    Oddi, A; Cesta, A

    2000-10-01

    Managers of medico-hospital facilities are facing two general problems when allocating resources to activities: (1) to find an agreement between several and contrasting requirements; (2) to manage dynamic and uncertain situations when constraints suddenly change over time due to medical needs. This paper describes the results of a research aimed at applying constraint-based scheduling techniques to the management of medical resources. A mixed-initiative problem solving approach is adopted in which a user and a decision support system interact to incrementally achieve a satisfactory solution to the problem. A running prototype is described called Interactive Scheduler which offers a set of functionalities for a mixed-initiative interaction to cope with the medical resource management. Interactive Scheduler is endowed with a representation schema used for describing the medical environment, a set of algorithms that address the specific problems of the domain, and an innovative interaction module that offers functionalities for the dialogue between the support system and its user. A particular contribution of this work is the explicit representation of constraint violations, and the definition of scheduling algorithms that aim at minimizing the amount of constraint violations in a solution.

  16. Priority scheme planning for the robust SSM/PMAD testbed

    NASA Technical Reports Server (NTRS)

    Elges, Michael R.; Ashworth, Barry R.

    1991-01-01

    Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.

  17. NED-2: A decision support system for integrated forest ecosystem management

    Treesearch

    Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; H. Michael Rauscher; Donald E. Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mayukh Dass; Hajime Uchiyama; Astrid Glende; Robin E. Hoffman

    2005-01-01

    NED-2 is a Windows-based system designed to improve project-level planning and decision making by providing useful and scientifically sound information to natural resource managers. Resources currently addressed include visual quality, ecology, forest health, timber, water, and wildlife. NED-2 expands on previous versions of NED applications by integrating treatment...

  18. NED-2: a decision support system for integrated forest ecosystem management

    Treesearch

    Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; H. Michael Rauscher; Donald E. Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mayukh Dass; Hajime Uchiyama; Astrid Glende; Robin E. Hoffman

    2005-01-01

    NED-2 is a Windows-based system designed to improve project-level planning and decision making by providing useful and scientifically sound information to natural resource managers. Resources currently addressed include visual quality, ecology, forest health, timber, water, and wildlife. NED-2 expands on previous versions of NED applications by integrating treatment...

  19. SLURM: Simple Linux Utility for Resource Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jette, M; Dunlap, C; Garlick, J

    2002-07-08

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, scheduling and stream copy modules. The design also includes a scalable, general-purpose communication infrastructure. This paper presents a overview of the SLURM architecture and functionality.

  20. Inventorying national forest resources...for planning-programing-budgeting system

    Treesearch

    Miles R. Hill; Elliot L. Amidon

    1968-01-01

    New systems for analyzing resource management problems, such as Planning-Programing-Budgeting, will require automated procedures to collect and assemble resource inventory data. A computer - oriented system called Map Information Assembly and Display System developed for this purpose was tested on a National Forest in California. It provided information on eight forest...

  1. Distributed data analysis in ATLAS

    NASA Astrophysics Data System (ADS)

    Nilsson, Paul; Atlas Collaboration

    2012-12-01

    Data analysis using grid resources is one of the fundamental challenges to be addressed before the start of LHC data taking. The ATLAS detector will produce petabytes of data per year, and roughly one thousand users will need to run physics analyses on this data. Appropriate user interfaces and helper applications have been made available to ensure that the grid resources can be used without requiring expertise in grid technology. These tools enlarge the number of grid users from a few production administrators to potentially all participating physicists. ATLAS makes use of three grid infrastructures for the distributed analysis: the EGEE sites, the Open Science Grid, and Nordu Grid. These grids are managed by the gLite workload management system, the PanDA workload management system, and ARC middleware; many sites can be accessed via both the gLite WMS and PanDA. Users can choose between two front-end tools to access the distributed resources. Ganga is a tool co-developed with LHCb to provide a common interface to the multitude of execution backends (local, batch, and grid). The PanDA workload management system provides a set of utilities called PanDA Client; with these tools users can easily submit Athena analysis jobs to the PanDA-managed resources. Distributed data is managed by Don Quixote 2, a system developed by ATLAS; DQ2 is used to replicate datasets according to the data distribution policies and maintains a central catalog of file locations. The operation of the grid resources is continually monitored by the Ganga Robot functional testing system, and infrequent site stress tests are performed using the Hammer Cloud system. In addition, the DAST shift team is a group of power users who take shifts to provide distributed analysis user support; this team has effectively relieved the burden of support from the developers.

  2. A Management Information System Model for Program Management. Ph.D. Thesis - Oklahoma State Univ.; [Computerized Systems Analysis

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1972-01-01

    The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

  3. Job submission and management through web services: the experience with the CREAM service

    NASA Astrophysics Data System (ADS)

    Aiftimiei, C.; Andreetto, P.; Bertocco, S.; Fina, S. D.; Ronco, S. D.; Dorigo, A.; Gianelle, A.; Marzolla, M.; Mazzucato, M.; Sgaravatto, M.; Verlato, M.; Zangrando, L.; Corvo, M.; Miccio, V.; Sciaba, A.; Cesini, D.; Dongiovanni, D.; Grandi, C.

    2008-07-01

    Modern Grid middleware is built around components providing basic functionality, such as data storage, authentication, security, job management, resource monitoring and reservation. In this paper we describe the Computing Resource Execution and Management (CREAM) service. CREAM provides a Web service-based job execution and management capability for Grid systems; in particular, it is being used within the gLite middleware. CREAM exposes a Web service interface allowing conforming clients to submit and manage computational jobs to a Local Resource Management System. We developed a special component, called ICE (Interface to CREAM Environment) to integrate CREAM in gLite. ICE transfers job submissions and cancellations from the Workload Management System, allowing users to manage CREAM jobs from the gLite User Interface. This paper describes some recent studies aimed at assessing the performance and reliability of CREAM and ICE; those tests have been performed as part of the acceptance tests for integration of CREAM and ICE in gLite. We also discuss recent work towards enhancing CREAM with a BES and JSDL compliant interface.

  4. Systems identification and the adaptive management of waterfowl in the United States

    USGS Publications Warehouse

    Williams, B.K.; Nichols, J.D.

    2001-01-01

    Waterfowl management in the United States is one of the more visible conservation success stories in the United States. It is authorized and supported by appropriate legislative authorities, based on large-scale monitoring programs, and widely accepted by the public. The process is one of only a limited number of large-scale examples of effective collaboration between research and management, integrating scientific information with management in a coherent framework for regulatory decision-making. However, harvest management continues to face some serious technical problems, many of which focus on sequential identification of the resource system in a context of optimal decision-making. The objective of this paper is to provide a theoretical foundation of adaptive harvest management, the approach currently in use in the United States for regulatory decision-making. We lay out the legal and institutional framework for adaptive harvest management and provide a formal description of regulatory decision-making in terms of adaptive optimization. We discuss some technical and institutional challenges in applying adaptive harvest management and focus specifically on methods of estimating resource states for linear resource systems.

  5. Opening a Can of wERMS: Texas A&M University's Experiences in Implementing Two Electronic Resource Management Systems

    ERIC Educational Resources Information Center

    Hartnett, Eric; Price, Apryl; Smith, Jane; Barrett, Michael

    2010-01-01

    Over the past few years, Texas A&M University (TAMU) has searched for a way to administer its electronic subscriptions as well as the electronic subscriptions shared among the TAMU System. In this article, we address our attempts to implement an effective electronic resource management system (ERMS), both for subscriptions on the main campus…

  6. Can we manage for resilience? The integration of resilience thinking into natural resource management in the united states

    EPA Science Inventory

    The concept of resilience is now frequently invoked by natural resource agencies in the United States. This reflects growing trends within ecology, conservation biology, and other disciplines acknowledging that social-ecological systems require management approaches recognizing ...

  7. The use of an integrated variable fuzzy sets in water resources management

    NASA Astrophysics Data System (ADS)

    Qiu, Qingtai; Liu, Jia; Li, Chuanzhe; Yu, Xinzhe; Wang, Yang

    2018-06-01

    Based on the evaluation of the present situation of water resources and the development of water conservancy projects and social economy, optimal allocation of regional water resources presents an increasing need in the water resources management. Meanwhile it is also the most effective way to promote the harmonic relationship between human and water. In view of the own limitations of the traditional evaluations of which always choose a single index model using in optimal allocation of regional water resources, on the basis of the theory of variable fuzzy sets (VFS) and system dynamics (SD), an integrated variable fuzzy sets model (IVFS) is proposed to address dynamically complex problems in regional water resources management in this paper. The model is applied to evaluate the level of the optimal allocation of regional water resources of Zoucheng in China. Results show that the level of allocation schemes of water resources ranging from 2.5 to 3.5, generally showing a trend of lower level. To achieve optimal regional management of water resources, this model conveys a certain degree of accessing water resources management, which prominently improve the authentic assessment of water resources management by using the eigenvector of level H.

  8. Analysis of Service Records Management Systems for Rescue and Retention of Cultural Resource Documents

    DTIC Science & Technology

    2009-06-01

    this information was not migrated to the new data- base . The responsible offices were told to destroy the old cards, and thus, vast amounts of...then necessary to examine the online service-specific records management systems , namely Army Records Information Management System (ARIMS ), Air...Force Records Information Management System (AFRIMS), and the Navy Records Management System .3 Each system

  9. Using Forecasting to Predict Long-Term Resource Utilization for Web Services

    ERIC Educational Resources Information Center

    Yoas, Daniel W.

    2013-01-01

    Researchers have spent years understanding resource utilization to improve scheduling, load balancing, and system management through short-term prediction of resource utilization. Early research focused primarily on single operating systems; later, interest shifted to distributed systems and, finally, into web services. In each case researchers…

  10. Online fault adaptive control for efficient resource management in Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    Abdelwahed, Sherif; Wu, Jian; Biswas, Gautam; Ramirez, John; Manders, Eric-J

    2005-01-01

    This article presents the design and implementation of a controller scheme for efficient resource management in Advanced Life Support Systems. In the proposed approach, a switching hybrid system model is used to represent the dynamics of the system components and their interactions. The operational specifications for the controller are represented by utility functions, and the corresponding resource management problem is formulated as a safety control problem. The controller is designed as a limited-horizon online supervisory controller that performs a limited forward search on the state-space of the system at each time step, and uses the utility functions to decide on the best action. The feasibility and accuracy of the online algorithm can be assessed at design time. We demonstrate the effectiveness of the scheme by running a set of experiments on the Reverse Osmosis (RO) subsystem of the Water Recovery System (WRS).

  11. Online fault adaptive control for efficient resource management in Advanced Life Support Systems.

    PubMed

    Abdelwahed, Sherif; Wu, Jian; Biswas, Gautam; Ramirez, John; Manders, Eric-J

    2005-01-01

    This article presents the design and implementation of a controller scheme for efficient resource management in Advanced Life Support Systems. In the proposed approach, a switching hybrid system model is used to represent the dynamics of the system components and their interactions. The operational specifications for the controller are represented by utility functions, and the corresponding resource management problem is formulated as a safety control problem. The controller is designed as a limited-horizon online supervisory controller that performs a limited forward search on the state-space of the system at each time step, and uses the utility functions to decide on the best action. The feasibility and accuracy of the online algorithm can be assessed at design time. We demonstrate the effectiveness of the scheme by running a set of experiments on the Reverse Osmosis (RO) subsystem of the Water Recovery System (WRS).

  12. Managing the Nation's water in a changing climate

    USGS Publications Warehouse

    Lins, H.F.; Stakhiv, E.Z.

    1998-01-01

    Among the many concerns associated with global climate change, the potential effects on water resources are frequently cited as the most worrisome. In contrast, those who manage water resources do not rate climatic change among their top planning and operational concerns. The difference in these views can be associated with how water managers operate their systems and the types of stresses, and the operative time horizons, that affect the Nation's water resources infrastructure. Climate, or more precisely weather, is an important variable in the management of water resources at daily to monthly time scales because water resources systems generally are operated on a daily basis. At decadal to centennial time scales, though, climate is much less important because (1) forecasts, particularly of regional precipitation, are extremely uncertain over such time periods, and (2) the magnitude of effects due to changes in climate on water resources is small relative to changes in other variables such as population, technology, economics, and environmental regulation. Thus, water management agencies find it difficult to justify changing design features or operating rules on the basis of simulated climatic change at the present time, especially given that reservoir-design criteria incorporate considerable buffering capacity for extreme meteorological and hydrological events.

  13. Planning and Resource Management in an Intelligent Automated Power Management System

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  14. Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China

    NASA Astrophysics Data System (ADS)

    Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.

    2017-11-01

    Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.

  15. Experience on HTCondor batch system for HEP and other research fields at KISTI-GSDC

    NASA Astrophysics Data System (ADS)

    Ahn, S. U.; Jaikar, A.; Kong, B.; Yeo, I.; Bae, S.; Kim, J.

    2017-10-01

    Global Science experimental Data hub Center (GSDC) at Korea Institute of Science and Technology Information (KISTI) located at Daejeon in South Korea is the unique datacenter in the country which helps with its computing resources fundamental research fields dealing with the large-scale of data. For historical reason, it has run Torque batch system while recently it starts running HTCondor for new systems. Having different kinds of batch systems implies inefficiency in terms of resource management and utilization. We conducted a research on resource management with HTCondor for several user scenarios corresponding to the user environments that currently GSDC supports. A recent research on the resource usage patterns at GSDC is considered in this research to build the possible user scenarios. Checkpointing and Super-Collector model of HTCondor give us more efficient and flexible way to manage resources and Grid Gate provided by HTCondor helps to interface with the Grid environment. In this paper, the overview on the essential features of HTCondor exploited in this work is described and the practical examples for HTCondor cluster configuration in our cases are presented.

  16. Current status of waste management in Botswana: A mini-review.

    PubMed

    Mmereki, Daniel

    2018-05-01

    Effective waste management practices are not all about legislative solutions, but a combination of the environmental, social, technical, technically skilled human resources, financial and technological resources, resource recycling, environmental pollution awareness programmes and public participation. As a result of insufficient resources, municipal solid waste (MSW) in transition and developing countries like Botswana remains a challenge, and it is often not yet given highest priority. In Botswana, the environment, public health and other socio-economic aspects are threatened by waste management practices due to inadequate implementation and enforcement mechanisms of waste management policy. This mini-review paper describes the panorama of waste management practices in Botswana and provides information to competent authorities responsible for waste management and to researchers to develop and implement an effective waste management system. Waste management practices in Botswana are affected by: lack of effective implementation of national waste policy, fragmented tasks and overlapping mandates among relevant institutions; lack of clear guidelines on the responsibilities of the generators and public authorities and on the associated economic incentives; and lack of consistent and comprehensive solid waste management policies; lack of intent by decision-makers to prepare national waste management plans and systems, and design and implement an integrated sustainable municipal solid waste management system. Due to these challenges, there are concerns over the growing trend of the illegal dumping of waste, creating mini dumping sites all over the country, and such actions jeopardize the efforts of lobbying investors and tourism business. Recommendations for concerted efforts are made to support decision makers to re-organize a sustainable waste management system, and this paper provides a reference to other emerging economies in the region and the world.

  17. Data collection system: Earth Resources Technology Satellite-1

    NASA Technical Reports Server (NTRS)

    Cooper, S. (Editor); Ryan, P. T. (Editor)

    1975-01-01

    Subjects covered at the meeting concerned results on the overall data collection system including sensors, interface hardware, power supplies, environmental enclosures, data transmission, processing and distribution, maintenance and integration in resources management systems.

  18. Concierge: Personal Database Software for Managing Digital Research Resources

    PubMed Central

    Sakai, Hiroyuki; Aoyama, Toshihiro; Yamaji, Kazutsuna; Usui, Shiro

    2007-01-01

    This article introduces a desktop application, named Concierge, for managing personal digital research resources. Using simple operations, it enables storage of various types of files and indexes them based on content descriptions. A key feature of the software is a high level of extensibility. By installing optional plug-ins, users can customize and extend the usability of the software based on their needs. In this paper, we also introduce a few optional plug-ins: literature management, electronic laboratory notebook, and XooNlps client plug-ins. XooNIps is a content management system developed to share digital research resources among neuroscience communities. It has been adopted as the standard database system in Japanese neuroinformatics projects. Concierge, therefore, offers comprehensive support from management of personal digital research resources to their sharing in open-access neuroinformatics databases such as XooNIps. This interaction between personal and open-access neuroinformatics databases is expected to enhance the dissemination of digital research resources. Concierge is developed as an open source project; Mac OS X and Windows XP versions have been released at the official site (http://concierge.sourceforge.jp). PMID:18974800

  19. Towards adaptive and integrated management paradigms to meet the challenges of water governance.

    PubMed

    Halbe, J; Pahl-Wostl, C; Sendzimir, J; Adamowski, J

    2013-01-01

    Integrated Water Resource Management (IWRM) aims at finding practical and sustainable solutions to water resource issues. Research and practice have shown that innovative methods and tools are not sufficient to implement IWRM - the concept needs to also be integrated in prevailing management paradigms and institutions. Water governance science addresses this human dimension by focusing on the analysis of regulatory processes that influence the behavior of actors in water management systems. This paper proposes a new methodology for the integrated analysis of water resources management and governance systems in order to elicit and analyze case-specific management paradigms. It builds on the Management and Transition Framework (MTF) that allows for the examination of structures and processes underlying water management and governance. The new methodology presented in this paper combines participatory modeling and analysis of the governance system by using the MTF to investigate case-specific management paradigms. The linking of participatory modeling and research on complex management and governance systems allows for the transfer of knowledge between scientific, policy, engineering and local communities. In this way, the proposed methodology facilitates assessment and implementation of transformation processes towards IWRM that require also the adoption of adaptive management principles. A case study on flood management in the Tisza River Basin in Hungary is provided to illustrate the application of the proposed methodology.

  20. 5 CFR 9901.401 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... between the performance management system and DoD's strategic plan; (4) A means for ensuring employee... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM...

  1. 5 CFR 9901.401 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... between the performance management system and DoD's strategic plan; (4) A means for ensuring employee... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM...

  2. Strategies for sustainable management of renewable resources during environmental change.

    PubMed

    Lindkvist, Emilie; Ekeberg, Örjan; Norberg, Jon

    2017-03-15

    As a consequence of global environmental change, management strategies that can deal with unexpected change in resource dynamics are becoming increasingly important. In this paper we undertake a novel approach to studying resource growth problems using a computational form of adaptive management to find optimal strategies for prevalent natural resource management dilemmas. We scrutinize adaptive management, or learning-by-doing, to better understand how to simultaneously manage and learn about a system when its dynamics are unknown. We study important trade-offs in decision-making with respect to choosing optimal actions (harvest efforts) for sustainable management during change. This is operationalized through an artificially intelligent model where we analyze how different trends and fluctuations in growth rates of a renewable resource affect the performance of different management strategies. Our results show that the optimal strategy for managing resources with declining growth is capable of managing resources with fluctuating or increasing growth at a negligible cost, creating in a management strategy that is both efficient and robust towards future unknown changes. To obtain this strategy, adaptive management should strive for: high learning rates to new knowledge, high valuation of future outcomes and modest exploration around what is perceived as the optimal action. © 2017 The Author(s).

  3. Sustainable composites from natural resources

    Treesearch

    R.M. Rowell

    2002-01-01

    In order to insure a continuous supply of natural agricultural resources, management of the agricultural producing land should be under a proactive system of land management whose goal is both sustainable agriculture and the promotion of healthy ecosystems. Ecosystem management is not a euphemism for preservation, which might imply benign neglect. Sustainable...

  4. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... Rivers system; management of wilderness characteristics; protection of resources important to maintaining a subsistence lifestyle; the importance of subsistence to local economies and traditional lifestyles... BLM-managed lands in the planning area for wilderness characteristics using criteria established by...

  5. Environmental Quality of the Pensacola Bay System: Retrospective Review for Future Resource Management and Rehabilitation

    EPA Science Inventory

    The objective of this report is to summarize the scattered environmental information for the PBS which is essential for understanding its current environmental condition and trend and needed for future cost-effective and science-based resource management. The management and regul...

  6. 5 CFR 9701.509 - Powers and duties of the HSLRB.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Powers and duties of the HSLRB. 9701.509 Section 9701.509 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.509 Powers and duties of the HSLRB...

  7. Securely and Flexibly Sharing a Biomedical Data Management System

    PubMed Central

    Wang, Fusheng; Hussels, Phillip; Liu, Peiya

    2011-01-01

    Biomedical database systems need not only to address the issues of managing complex data, but also to provide data security and access control to the system. These include not only system level security, but also instance level access control such as access of documents, schemas, or aggregation of information. The latter is becoming more important as multiple users can share a single scientific data management system to conduct their research, while data have to be protected before they are published or IP-protected. This problem is challenging as users’ needs for data security vary dramatically from one application to another, in terms of who to share with, what resources to be shared, and at what access level. We develop a comprehensive data access framework for a biomedical data management system SciPort. SciPort provides fine-grained multi-level space based access control of resources at not only object level (documents and schemas), but also space level (resources set aggregated in a hierarchy way). Furthermore, to simplify the management of users and privileges, customizable role-based user model is developed. The access control is implemented efficiently by integrating access privileges into the backend XML database, thus efficient queries are supported. The secure access approach we take makes it possible for multiple users to share the same biomedical data management system with flexible access management and high data security. PMID:21625285

  8. Culture and resource management: factors affecting forests

    Treesearch

    Marjorie C. Falanruw

    1992-01-01

    Efforts to manage Pacific Island forest resources are more likely to succeed if they are based on an understanding of the cultural framework of land use activities. This paper explores the relationship between agricultural systems, population density, culture, and use of forest resources on the islands of Yap. Agricultural intensification is related to population...

  9. The RCM: A Resource Management and Program Budgeting Approach for State and Local Educational Agencies.

    ERIC Educational Resources Information Center

    Chambers, Jay G.; Parrish, Thomas B.

    The Resource Cost Model (RCM) is a resource management system that combines the technical advantages of sophisticated computer simulation software with the practical benefits of group decision making to provide detailed information about educational program costs. The first section of this document introduces the conceptual framework underlying…

  10. REEF: Retainable Evaluator Execution Framework

    PubMed Central

    Weimer, Markus; Chen, Yingda; Chun, Byung-Gon; Condie, Tyson; Curino, Carlo; Douglas, Chris; Lee, Yunseong; Majestro, Tony; Malkhi, Dahlia; Matusevych, Sergiy; Myers, Brandon; Narayanamurthy, Shravan; Ramakrishnan, Raghu; Rao, Sriram; Sears, Russell; Sezgin, Beysim; Wang, Julia

    2015-01-01

    Resource Managers like Apache YARN have emerged as a critical layer in the cloud computing system stack, but the developer abstractions for leasing cluster resources and instantiating application logic are very low-level. This flexibility comes at a high cost in terms of developer effort, as each application must repeatedly tackle the same challenges (e.g., fault-tolerance, task scheduling and coordination) and re-implement common mechanisms (e.g., caching, bulk-data transfers). This paper presents REEF, a development framework that provides a control-plane for scheduling and coordinating task-level (data-plane) work on cluster resources obtained from a Resource Manager. REEF provides mechanisms that facilitate resource re-use for data caching, and state management abstractions that greatly ease the development of elastic data processing work-flows on cloud platforms that support a Resource Manager service. REEF is being used to develop several commercial offerings such as the Azure Stream Analytics service. Furthermore, we demonstrate REEF development of a distributed shell application, a machine learning algorithm, and a port of the CORFU [4] system. REEF is also currently an Apache Incubator project that has attracted contributors from several instititutions.1 PMID:26819493

  11. Beyond the Paycheck: A Human Resources Management Guide for Leaders of Small Youth-Serving Organizations

    ERIC Educational Resources Information Center

    Casey, Thomas P.

    2009-01-01

    This guide aims to help organization leaders develop the tools and knowledge they need to create and use sound human resources management (HRM) systems and practices that support program success and sustainability. It identifies key components of HRM systems and discusses important considerations in designing HRM policies, procedures, and…

  12. Hacking Blackboard: Customizing Access to Library Resources through the Blackboard Course Management System

    ERIC Educational Resources Information Center

    Kellam, Lynda M.; Cox, Richard; Winkler, Hannah

    2009-01-01

    Academic libraries have long been trying to gain access to users through their favorite online spaces, such as social networking sites. In this article a project of the University of North Carolina at Greensboro's University Libraries, which integrated library resources with the campus course management system, Blackboard, is detailed. The main…

  13. Forage resource evaluation system for habitat—deer: an interactive deer habitat model

    Treesearch

    Thomas A. Hanley; Donald E. Spalinger; Kenrick J. Mock; Oran L. Weaver; Grant M. Harris

    2012-01-01

    We describe a food-based system for quantitatively evaluating habitat quality for deer called the Forage Resource Evaluation System for Habitat and provide its rationale and suggestions for use. The system was developed as a tool for wildlife biologists and other natural resource managers and planners interested in evaluating habitat quality and, especially, comparing...

  14. Research on rebuilding the data information environment for aeronautical manufacturing enterprise

    NASA Astrophysics Data System (ADS)

    Feng, Xilan; Jiang, Zhiqiang; Zong, Xuewen; Shi, Jinfa

    2005-12-01

    The data environment on integrated information system and the basic standard on information resource management are the key effectively of the remote collaborative designing and manufacturing for complex product. A study project on rebuilding the data information environment for aeronautical manufacturing enterprise (Aero-ME) is put forwarded. Firstly, the data environment on integrated information system, the basic standard on information resource management, the basic establishment on corporation's information, the development on integrated information system, and the information education are discussed profoundly based on the practical requirement of information resource and technique for contemporary Aero-ME. Then, the idea and method with the data environment rebuilding based on I-CASE in the corporation is put forward, and the effective method and implement approach for manufacturing enterprise information is brought forwards. It will also the foundation and assurance that rebuilding the corporation data-environment and promoting standardizing information resource management for the development of Aero-ME information engineering.

  15. From safe yield to sustainable development of water resources - The Kansas experience

    USGS Publications Warehouse

    Sophocleous, M.

    2000-01-01

    This paper presents a synthesis of water sustainability issues from the hydrologic perspective. It shows that safe yield is a flawed concept and that sustainability is an idea that is broadly used but perhaps not well understood. In general, the sustainable yield of an aquifer must be considerably less than recharge if adequate amounts of water are to be available to sustain both the quantity and quality of streams, springs, wetlands, and ground-water-dependent ecosystems. To ensure sustainability, it is imperative that water limits be established based on hydrologic principles of mass balance. To establish water-use policies and planning horizons, the transition curves of aquifer systems from ground-water storage depletion to induced recharge of surface water need to be developed. Present-day numerical models are capable of generating such transition curves. Several idealized examples of aquifer systems show how this could be done. Because of the complexity of natural systems and the uncertainties in characterizing them, the current philosophy underlying sustainable management of water resources is based on the interconnected systems approach and on adaptive management. Examples of water-resources management from Kansas illustrate some of these concepts in a real-world setting. Some of the hallmarks of Kansas water management are the formation of local ground-water management districts, the adoption of minimum streamflow standards, the use of modified safe-yield policies in some districts, the implementation of integrated resource planning by the City of Wichita, and the subbasin water-resources management program in potential problem areas. These are all appropriate steps toward sustainable development. The Kansas examples show that local decision-making is the best way to fully account for local variability in water management. However, it is imperative that public education and involvement be encouraged, so that system complexities and constraints are better understood and overly simplistic solutions avoided. (C) 2000 Elsevier Science B.V.This paper presents a synthesis of water sustainability issues from the hydrologic perspective. It shows that safe yield is a flawed concept and that sustainability is an idea that is broadly used but perhaps not well understood. In general, the sustainable yield of an aquifer must be considerably less than recharge if adequate amounts of water are to be available to sustain both the quantity and quality of streams, springs, wetlands, and ground-water-dependent ecosystems. To ensure sustainability, it is imperative that water limits be established based on hydrologic principles of mass balance. To establish water-use policies and planning horizons, the transition curves of aquifer systems from ground-water storage depletion to induced recharge of surface water need to be developed. Present-day numerical models are capable of generating such transition curves. Several idealized examples of aquifer systems show how this could be done. Because of the complexity of natural systems and the uncertainties in characterizing them, the current philosophy underlying sustainable management of water resources is based on the interconnected systems approach and on adaptive management. Examples of water-resources management from Kansas illustrate some of these concepts in a real-world setting. Some of the hallmarks of Kansas water management are the formation of local ground-water management districts, the adoption of minimum streamflow standards, the use of modified safe-yield policies in some districts, the implementation of integrated resource planning by the City of Wichita, and the subbasin water-resources management program in potential problem areas. These are all appropriate steps toward sustainable development. The Kansas examples show that local decision-making is the best way to fully account for local variability in water management. However, it is imperative that public education and involv

  16. Understanding how orthopaedic surgery practices generate value for healthcare systems.

    PubMed

    Olson, Steven A; Mather, Richard C

    2013-06-01

    Orthopaedic surgery practices can provide substantial value to healthcare systems. Increasingly, healthcare administrators are speaking of the need for alignment between physicians and healthcare systems. However, physicians often do not understand what healthcare administrators value and therefore have difficulty articulating the value they create in discussions with their hospital or healthcare organization. Many health systems and hospitals use service lines as an organizational structure to track the relevant data and manage the resources associated with a particular type of care, such as musculoskeletal care. Understanding service lines and their management can be useful for orthopaedic surgeons interested in interacting with their hospital systems. We provide an overview of two basic types of value orthopaedic surgeons create for healthcare systems: financial or volume-driven benefits and nonfinancial quality or value-driven patient care benefits. We performed a search of PubMed from 1965 to 2012 using the term "service line." Of the 351 citations identified, 18 citations specifically involved the use of service lines to improve patient care in both nursing and medical journals. A service line is a structure used in healthcare organizations to enable management of a subset of activities or resources in a focused area of patient care delivery. There is not a consistent definition of what resources are managed within a service line from hospital to hospital. Physicians can positively impact patient care through engaging in service line management. There is increasing pressure for healthcare systems and hospitals to partner with orthopaedic surgeons. The peer-reviewed literature demonstrates there are limited resources for physicians to understand the value they create when attempting to negotiate with their hospital or healthcare organization. To effectively negotiate for resources to provide the best care for patients, orthopaedic surgeons need to claim and demonstrate the value they create in healthcare organizations.

  17. [Design and application of implantable medical device information management system].

    PubMed

    Cao, Shaoping; Yin, Chunguang; Zhao, Zhenying

    2013-03-01

    Through the establishment of implantable medical device information management system, with the aid of the regional joint sharing of resources, we further enhance the implantable medical device traceability management level, strengthen quality management, control of medical risk.

  18. Policy Sciences in Water Resources Research

    NASA Astrophysics Data System (ADS)

    Cummings, Ronald G.

    1984-07-01

    As the newly appointed Policy Sciences Editor for this journal, I would like to take this opportunity to introduce myself to WRR's readership as well as to offer a few comments concerning my views of policy sciences in water resources research. I am an economist working in the area of natural resources and environmental management. As such, I've spent a good part of my research career working with noneconomists. During 1969-1972, I worked in Mexico with hydrologists and engineers from Mexico's Water Resources Ministry in efforts to assess management/investment programs for reservoir systems and systems for interbasin water transfers. Between 1972 and 1975, while serving as Chairman of the Department of Resource Economics at the University of Rhode Island, my research involved collaborative efforts with biologists and soil scientists in studies concerning the conjunctive management of reservoirs for agricultural and lagoon systems and the control of salinity levels in soils and aquifers. Since 1975, at which time I joined the faculty at the University of New Mexico, I have worked with engineers at the Los Alamos National Laboratory in developing operation/management models for hot, dry rock geothermal systems and, more recently, with legal scholars and hydrologists in analyses of water rights issues. Thus I am comfortable with and appreciative of research conducted by my colleagues in systems engineering, operations research, and hydrology, as well as those in economics, law, and other social sciences.

  19. CSPMS supported by information technology

    NASA Astrophysics Data System (ADS)

    Zhang, Hudan; Wu, Heng

    This paper will propose a whole new viewpoint about building a CSPMS(Coal-mine Safety Production Management System) by means of information technology. This system whose core part is a four-grade automatic triggered warning system achieves the goal that information transmission will be smooth, nondestructive and in time. At the same time, the system provides a comprehensive and collective technology platform for various Public Management Organizations and coal-mine production units to deal with safety management, advance warning, unexpected incidents, preplan implementation, and resource deployment at different levels. The database of this system will support national related industry's resource control, plan, statistics, tax and the construction of laws and regulations effectively.

  20. Today's CIO: catalyst for managed care change.

    PubMed

    Sanchez, P

    1997-05-01

    As the impact of managed care increases and capitation becomes all pervasive, healthcare providers' attention to cost control will intensify. For integrated delivery networks (IDNs) to be competitive, today's CIO must leverage managed care as a catalyst for change, and use a sophisticated information system toolset as the means to an integrated end. An area many CIOs target for fast results and maximum cost savings in resource management. This article reviews how Dick Escue, chief information officer at Baptist Memorial Health Care Corporation (Memphis, TN), uses electronic information management systems to integrate and conserve the resources of Baptist's widespread healthcare organization.

  1. Fuzzy cognitive maps for issue identification in a water resources conflict resolution system

    NASA Astrophysics Data System (ADS)

    Giordano, R.; Passarella, G.; Uricchio, V. F.; Vurro, M.

    In water management, conflicts of interests are inevitable due to the variety in quality demands and the number of stakeholders, which are affected in different ways by decisions concerning the use of the resources. Ignoring the differences among interests involved in water resources management and not resolving the emerging conflicts could lead to controversial strategies. In such cases, proposed solutions could generate strong opposition, making these solutions unfeasible. In our contribution, a Community Decision Support System is proposed. Such a system is able to support discussion and collaboration. The system helps participants to structure their problem, to help them learn about possible alternatives, their constraints and implications and to support the participants in the specification of their own preferences. More in detail, the proposed system helps each user in representing and communicating problem perspectives. To reach this aim, cognitive maps are used to capture parts of the stakeholders’ point of view and to enhance negotiation among individuals and organizations. The aim of the negotiation process is to define a shared cognitive map with regard to water management problems. Such a map can be called a water community cognitive map. The system performance has been tested by simulating a real conflict on water resources management that occurred some years ago in a river basin in the south of Italy.

  2. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

  3. An operational earth resources satellite system: The LANDSAT follow-on program

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1977-01-01

    The LANDSATS 1 and 2 have demonstrated the role of remote sensing from satellite in research, development, and operational activities essential to the better management of our resources. Hundreds of agricultural, geological, hydrological, urban land use, and other investigations have raised the question of the development of an operational system providing continuous, timely data. The LANDSAT Follow-on Study addressed the economics, technological performance, and design of a system in transition from R and D to operations. Economic benefits were identified; and a complete system from sensors to the ultilization in forecasting crop production, oil and mineral exploration, and water resources management was designed.

  4. 5 CFR 9701.221 - Classification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Classification requirements. 9701.221 Section 9701.221 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Classification Classification Process § 9701.221 Classification...

  5. 36 CFR 219.14 - Involvement of State and local governments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...

  6. 36 CFR 219.14 - Involvement of State and local governments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...

  7. 5 CFR 9701.501 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES... Department's mission foremost in mind. The regulations also recognize the rights of DHS employees to organize...

  8. Managing living marine resources in a dynamic environment: The role of seasonal to decadal climate forecasts

    NASA Astrophysics Data System (ADS)

    Tommasi, Desiree; Stock, Charles A.; Hobday, Alistair J.; Methot, Rick; Kaplan, Isaac C.; Eveson, J. Paige; Holsman, Kirstin; Miller, Timothy J.; Gaichas, Sarah; Gehlen, Marion; Pershing, Andrew; Vecchi, Gabriel A.; Msadek, Rym; Delworth, Tom; Eakin, C. Mark; Haltuch, Melissa A.; Séférian, Roland; Spillman, Claire M.; Hartog, Jason R.; Siedlecki, Samantha; Samhouri, Jameal F.; Muhling, Barbara; Asch, Rebecca G.; Pinsky, Malin L.; Saba, Vincent S.; Kapnick, Sarah B.; Gaitan, Carlos F.; Rykaczewski, Ryan R.; Alexander, Michael A.; Xue, Yan; Pegion, Kathleen V.; Lynch, Patrick; Payne, Mark R.; Kristiansen, Trond; Lehodey, Patrick; Werner, Francisco E.

    2017-03-01

    Recent developments in global dynamical climate prediction systems have allowed for skillful predictions of climate variables relevant to living marine resources (LMRs) at a scale useful to understanding and managing LMRs. Such predictions present opportunities for improved LMR management and industry operations, as well as new research avenues in fisheries science. LMRs respond to climate variability via changes in physiology and behavior. For species and systems where climate-fisheries links are well established, forecasted LMR responses can lead to anticipatory and more effective decisions, benefitting both managers and stakeholders. Here, we provide an overview of climate prediction systems and advances in seasonal to decadal prediction of marine-resource relevant environmental variables. We then describe a range of climate-sensitive LMR decisions that can be taken at lead-times of months to decades, before highlighting a range of pioneering case studies using climate predictions to inform LMR decisions. The success of these case studies suggests that many additional applications are possible. Progress, however, is limited by observational and modeling challenges. Priority developments include strengthening of the mechanistic linkages between climate and marine resource responses, development of LMR models able to explicitly represent such responses, integration of climate driven LMR dynamics in the multi-driver context within which marine resources exist, and improved prediction of ecosystem-relevant variables at the fine regional scales at which most marine resource decisions are made. While there are fundamental limits to predictability, continued advances in these areas have considerable potential to make LMR managers and industry decision more resilient to climate variability and help sustain valuable resources. Concerted dialog between scientists, LMR managers and industry is essential to realizing this potential.

  9. A GIS based watershed information system for water resources management and planning in semi-arid areas

    NASA Astrophysics Data System (ADS)

    Tzabiras, John; Spiliotopoulos, Marios; Kokkinos, Kostantinos; Fafoutis, Chrysostomos; Sidiropoulos, Pantelis; Vasiliades, Lampros; Papaioannou, George; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-04-01

    The overall objective of this work is the development of an Information System which could be used by stakeholders for the purposes of water management as well as for planning and strategic decision-making in semi-arid areas. An integrated modeling system has been developed and applied to evaluate the sustainability of water resources management strategies in Lake Karla watershed, Greece. The modeling system, developed in the framework of "HYDROMENTOR" research project, is based on a GIS modelling approach which uses remote sensing data and includes coupled models for the simulation of surface water and groundwater resources, the operation of hydrotechnical projects (reservoir operation and irrigation works) and the estimation of water demands at several spatial scales. Lake Karla basin was the region where the system was tested but the methodology may be the basis for future analysis elsewhere. Τwo (2) base and three (3) management scenarios were investigated. In total, eight (8) water management scenarios were evaluated: i) Base scenario without operation of the reservoir and the designed Lake Karla district irrigation network (actual situation) • Reduction of channel losses • Alteration of irrigation methods • Introduction of greenhouse cultivation ii) Base scenario including the operation of the reservoir and the Lake Karla district irrigation network • Reduction of channel losses • Alteration of irrigation methods • Introduction of greenhouse cultivation The results show that, under the existing water resources management, the water deficit of Lake Karla watershed is very large. However, the operation of the reservoir and the cooperative Lake Karla district irrigation network coupled with water demand management measures, like reduction of water distribution system losses and alteration of irrigation methods, could alleviate the problem and lead to sustainable and ecological use of water resources in the study area. Acknowledgements: This study has been supported by the research project "Hydromentor" funded by the Greek General Secretariat of Research and Technology in the framework of the E.U. co-funded National Action "Cooperation"

  10. 7 CFR 1955.56 - Real property located in Coastal Barrier Resources System (CBRS).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Real property located in Coastal Barrier Resources... Management of Property § 1955.56 Real property located in Coastal Barrier Resources System (CBRS). (a... Coastal Barrier Resources Act (CBRA). Pursuant to the requirements of the CBRA, and except as specified in...

  11. Management of construction and demolition wastes as secondary building resources

    NASA Astrophysics Data System (ADS)

    Manukhina, Lyubov; Ivanova, Irina

    2017-10-01

    The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.

  12. Operations system administration plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources,more » Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.« less

  13. Modelling Management Practices in Viticulture while Considering Resource Limitations: The Dhivine Model

    PubMed Central

    Martin-Clouaire, Roger; Rellier, Jean-Pierre; Paré, Nakié; Voltz, Marc; Biarnès, Anne

    2016-01-01

    Many farming-system studies have investigated the design and evaluation of crop-management practices with respect to economic performance and reduction in environmental impacts. In contrast, little research has been devoted to analysing these practices in terms of matching the recurrent context-dependent demand for resources (labour in particular) with those available on the farm. This paper presents Dhivine, a simulation model of operational management of grape production at the vineyard scale. Particular attention focuses on representing a flexible plan, which organises activities temporally, the resources available to the vineyard manager and the process of scheduling and executing the activities. The model relies on a generic production-system ontology used in several agricultural production domains. The types of investigations that the model supports are briefly illustrated. The enhanced realism of the production-management situations simulated makes it possible to examine and understand properties of resource-constrained work-organisation strategies and possibilities for improving them. PMID:26990089

  14. Developing a Vision: Incorporating Ecosystem Services into Decision Making - Proceedings of a Workshop

    USGS Publications Warehouse

    Hogan, Dianna; Arthaud, Greg; Goodman, Iris; Pattison, Malka; Sayre, Roger G.; Shapiro, Carl; Van Horne, Bea

    2009-01-01

    The production, location, use, and value of ecosystem services have become an important factor in resource management. Decisions relating to resource conservation and restoration, as well as development, require an understanding of the services provided by natural systems and the response of these systems to natural and human-induced change. Increased demands for development and the resulting pressures on ecosystem services have lent urgency to the need for an improved understanding of the value of natural capital. However, resource management decisions are often made without considering the importance and value of services resulting from natural systems.

  15. Role of information systems in public health services.

    PubMed

    Hartshorne, J E; Carstens, I L

    1990-07-01

    The purpose of this review is to establish a conceptual framework on the role of information systems in public health care. Information is indispensable for effective management and development of health services and therefore considered as an important operational asset or resource. A Health Information System is mainly required to support management and operations at four levels: namely transactional and functional; operational control; management planning and control; and strategic planning. To provide the necessary information needs of users at these levels of management in the health care system, a structured information system coupled with appropriate information technology is required. Adequate and relevant information is needed regarding population characteristics, resources available and expended, output and outcome of health care activities. Additionally information needs to be reliable, accurate, timely, easily accessible and presented in a compact and meaningful form. With a well-planned health information system health authorities would be in a position to provide a quality, cost-effective and efficient health service for as many people as need it, optimal utilisation of resources and to maintain and improve the community's health status.

  16. A resource-dependence model of hospital contract management.

    PubMed Central

    Alexander, J A; Morrisey, M A

    1989-01-01

    This study empirically examines the determinants of hospital entry into management contracts with multihospital systems. Using a resource-dependence framework, the study tests whether market conditions, regulatory climate, management effectiveness, and certain enabling factors affect the probability of hospital entry into a contract management arrangement. The study used a pooled sample of 312 contract-managed and 936 traditionally managed hospitals. Results suggest the importance of management effectiveness, regulatory climate, and hospital ownership (investor owned or nonprofit) as predisposing conditions of contract management. PMID:2732059

  17. Evaluating the effects of ecosystem management: a case study in a Missouri Ozark forest

    Treesearch

    Wendy K. Gram; Victoria L. Sork; Robert J. Marquis; Rochelle B. Renken; Richard L. Clawson; et. al.

    2002-01-01

    Many federal and state management agencies have shifted from commodity-based management systems to multiple resource-based management systems that emphasize sustainable ecosystem management. Long-term sustainability of ecosystem functions and processes is at the core of ecosystem management, but a blueprint for assessing sustainability under different management...

  18. A data management system to enable urgent natural disaster computing

    NASA Astrophysics Data System (ADS)

    Leong, Siew Hoon; Kranzlmüller, Dieter; Frank, Anton

    2014-05-01

    Civil protection, in particular natural disaster management, is very important to most nations and civilians in the world. When disasters like flash floods, earthquakes and tsunamis are expected or have taken place, it is of utmost importance to make timely decisions for managing the affected areas and reduce casualties. Computer simulations can generate information and provide predictions to facilitate this decision making process. Getting the data to the required resources is a critical requirement to enable the timely computation of the predictions. An urgent data management system to support natural disaster computing is thus necessary to effectively carry out data activities within a stipulated deadline. Since the trigger of a natural disaster is usually unpredictable, it is not always possible to prepare required resources well in advance. As such, an urgent data management system for natural disaster computing has to be able to work with any type of resources. Additional requirements include the need to manage deadlines and huge volume of data, fault tolerance, reliable, flexibility to changes, ease of usage, etc. The proposed data management platform includes a service manager to provide a uniform and extensible interface for the supported data protocols, a configuration manager to check and retrieve configurations of available resources, a scheduler manager to ensure that the deadlines can be met, a fault tolerance manager to increase the reliability of the platform and a data manager to initiate and perform the data activities. These managers will enable the selection of the most appropriate resource, transfer protocol, etc. such that the hard deadline of an urgent computation can be met for a particular urgent activity, e.g. data staging or computation. We associated 2 types of deadlines [2] with an urgent computing system. Soft-hard deadline: Missing a soft-firm deadline will render the computation less useful resulting in a cost that can have severe consequences Hard deadline: Missing a hard deadline renders the computation useless and results in full catastrophic consequences. A prototype of this system has a REST-based service manager. The REST-based implementation provides a uniform interface that is easy to use. New and upcoming file transfer protocols can easily be extended and accessed via the service manager. The service manager interacts with the other four managers to coordinate the data activities so that the fundamental natural disaster urgent computing requirement, i.e. deadline, can be fulfilled in a reliable manner. A data activity can include data storing, data archiving and data storing. Reliability is ensured by the choice of a network of managers organisation model[1] the configuration manager and the fault tolerance manager. With this proposed design, an easy to use, resource-independent data management system that can support and fulfill the computation of a natural disaster prediction within stipulated deadlines can thus be realised. References [1] H. G. Hegering, S. Abeck, and B. Neumair, Integrated management of networked systems - concepts, architectures, and their operational application, Morgan Kaufmann Publishers, 340 Pine Stret, Sixth Floor, San Francisco, CA 94104-3205, USA, 1999. [2] H. Kopetz, Real-time systems design principles for distributed embedded applications, second edition, Springer, LLC, 233 Spring Street, New York, NY 10013, USA, 2011. [3] S. H. Leong, A. Frank, and D. Kranzlmu¨ ller, Leveraging e-infrastructures for urgent computing, Procedia Computer Science 18 (2013), no. 0, 2177 - 2186, 2013 International Conference on Computational Science. [4] N. Trebon, Enabling urgent computing within the existing distributed computing infrastructure, Ph.D. thesis, University of Chicago, August 2011, http://people.cs.uchicago.edu/~ntrebon/docs/dissertation.pdf.

  19. The agent-based spatial information semantic grid

    NASA Astrophysics Data System (ADS)

    Cui, Wei; Zhu, YaQiong; Zhou, Yong; Li, Deren

    2006-10-01

    Analyzing the characteristic of multi-Agent and geographic Ontology, The concept of the Agent-based Spatial Information Semantic Grid (ASISG) is defined and the architecture of the ASISG is advanced. ASISG is composed with Multi-Agents and geographic Ontology. The Multi-Agent Systems are composed with User Agents, General Ontology Agent, Geo-Agents, Broker Agents, Resource Agents, Spatial Data Analysis Agents, Spatial Data Access Agents, Task Execution Agent and Monitor Agent. The architecture of ASISG have three layers, they are the fabric layer, the grid management layer and the application layer. The fabric layer what is composed with Data Access Agent, Resource Agent and Geo-Agent encapsulates the data of spatial information system so that exhibits a conceptual interface for the Grid management layer. The Grid management layer, which is composed with General Ontology Agent, Task Execution Agent and Monitor Agent and Data Analysis Agent, used a hybrid method to manage all resources that were registered in a General Ontology Agent that is described by a General Ontology System. The hybrid method is assembled by resource dissemination and resource discovery. The resource dissemination push resource from Local Ontology Agent to General Ontology Agent and the resource discovery pull resource from the General Ontology Agent to Local Ontology Agents. The Local Ontology Agent is derived from special domain and describes the semantic information of local GIS. The nature of the Local Ontology Agents can be filtrated to construct a virtual organization what could provides a global scheme. The virtual organization lightens the burdens of guests because they need not search information site by site manually. The application layer what is composed with User Agent, Geo-Agent and Task Execution Agent can apply a corresponding interface to a domain user. The functions that ASISG should provide are: 1) It integrates different spatial information systems on the semantic The Grid management layer establishes a virtual environment that integrates seamlessly all GIS notes. 2) When the resource management system searches data on different spatial information systems, it transfers the meaning of different Local Ontology Agents rather than access data directly. So the ability of search and query can be said to be on the semantic level. 3) The data access procedure is transparent to guests, that is, they could access the information from remote site as current disk because the General Ontology Agent could automatically link data by the Data Agents that link the Ontology concept to GIS data. 4) The capability of processing massive spatial data. Storing, accessing and managing massive spatial data from TB to PB; efficiently analyzing and processing spatial data to produce model, information and knowledge; and providing 3D and multimedia visualization services. 5) The capability of high performance computing and processing on spatial information. Solving spatial problems with high precision, high quality, and on a large scale; and process spatial information in real time or on time, with high-speed and high efficiency. 6) The capability of sharing spatial resources. The distributed heterogeneous spatial information resources are Shared and realizing integrated and inter-operated on semantic level, so as to make best use of spatial information resources,such as computing resources, storage devices, spatial data (integrating from GIS, RS and GPS), spatial applications and services, GIS platforms, 7) The capability of integrating legacy GIS system. A ASISG can not only be used to construct new advanced spatial application systems, but also integrate legacy GIS system, so as to keep extensibility and inheritance and guarantee investment of users. 8) The capability of collaboration. Large-scale spatial information applications and services always involve different departments in different geographic places, so remote and uniform services are needed. 9) The capability of supporting integration of heterogeneous systems. Large-scale spatial information systems are always synthetically applications, so ASISG should provide interoperation and consistency through adopting open and applied technology standards. 10) The capability of adapting dynamic changes. Business requirements, application patterns, management strategies, and IT products always change endlessly for any departments, so ASISG should be self-adaptive. Two examples are provided in this paper, those examples provide a detailed way on how you design your semantic grid based on Multi-Agent systems and Ontology. In conclusion, the semantic grid of spatial information system could improve the ability of the integration and interoperability of spatial information grid.

  20. Energy management system turns data into market info

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Traynor, P.J.; Ackerman, W.J.

    1996-09-01

    The designers claim that Wisconsin Power & Light Co`s new energy management system is the first system of its type in the world in terms of the comprehensiveness and scope of its stored and retrievable data. Furthermore, the system`s link to the utility`s generating assets enables powerplant management to dispatch generation resources based on up-to-date unit characteristics. That means that the new system gives WP&L a competitive tool to optimize operations as well as fine-tune its EMS based on timely load and unit response information. Additionally, the EMS gives WP&L insight into the complex issues related to the unbundling ofmore » generation resources.« less

  1. A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects

    NASA Astrophysics Data System (ADS)

    Mok, Esmond; Xia, Linyuan; Retscher, Guenther; Tian, Hui

    2010-06-01

    The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Real-time Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.

  2. Ecoregional-scale monitoring within conservation areas, in a rapidly changing climate

    USGS Publications Warehouse

    Beever, Erik A.; Woodward, Andrea

    2011-01-01

    Long-term monitoring of ecological systems can prove invaluable for resource management and conservation. Such monitoring can: (1) detect instances of long-term trend (either improvement or deterioration) in monitored resources, thus providing an early-warning indication of system change to resource managers; (2) inform management decisions and help assess the effects of management actions, as well as anthropogenic and natural disturbances; and (3) provide the grist for supplemental research on mechanisms of system dynamics and cause-effect relationships (Fancy et al., 2009). Such monitoring additionally provides a snapshot of the status of monitored resources during each sampling cycle, and helps assess whether legal standards and regulations are being met. Until the last 1-2 decades, tracking and understanding changes in condition of natural resources across broad spatial extents have been infrequently attempted. Several factors, however, are facilitating the achievement of such broad-scale investigation and monitoring. These include increasing awareness of the importance of landscape context, greater prevalence of regional and global environmental stressors, and the rise of landscape-scale programs designed to manage and monitor biological systems. Such programs include the US Forest Service's Forest Inventory and Analysis (FIA) Program (Moser et al., 2008), Canada's National Forest Inventory, the 3Q Programme for monitoring agricultural landscapes of Norway (Dramstad et al., 2002), and the emerging (US) Landscape Conservation Cooperatives (USDOI Secretarial Order 3289, 2009; Anonymous, 2011). This Special Section explores the underlying design considerations, as well as many pragmatic aspects associated with program implementation and interpretation of results from broad-scale monitoring systems, particularly within the constraints of high-latitude contexts (e.g., low road density, short field season, dramatic fluctuations in temperature). Although Alaska is the focus of most papers in this Special Section, we posit that many of the issues that characterize the remote, relatively undisturbed ecosystems of high northern latitudes are widespread and thus applicable to natural-resource management and conservation across northern portions of the Holarctic ecozone and indeed anywhere broad-scale monitoring is contemplated.

  3. Production Experiences with the Cray-Enabled TORQUE Resource Manager

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ezell, Matthew A; Maxwell, Don E; Beer, David

    High performance computing resources utilize batch systems to manage the user workload. Cray systems are uniquely different from typical clusters due to Cray s Application Level Placement Scheduler (ALPS). ALPS manages binary transfer, job launch and monitoring, and error handling. Batch systems require special support to integrate with ALPS using an XML protocol called BASIL. Previous versions of Adaptive Computing s TORQUE and Moab batch suite integrated with ALPS from within Moab, using PERL scripts to interface with BASIL. This would occasionally lead to problems when all the components would become unsynchronized. Version 4.1 of the TORQUE Resource Manager introducedmore » new features that allow it to directly integrate with ALPS using BASIL. This paper describes production experiences at Oak Ridge National Laboratory using the new TORQUE software versions, as well as ongoing and future work to improve TORQUE.« less

  4. A model for ubiquitous care of noncommunicable diseases.

    PubMed

    Vianna, Henrique Damasceno; Barbosa, Jorge Luis Victória

    2014-09-01

    The ubiquitous computing, or ubicomp, is a promising technology to help chronic diseases patients managing activities, offering support to them anytime, anywhere. Hence, ubicomp can aid community and health organizations to continuously communicate with patients and to offer useful resources for their self-management activities. Communication is prioritized in works of ubiquitous health for noncommunicable diseases care, but the management of resources is not commonly employed. We propose the UDuctor, a model for ubiquitous care of noncommunicable diseases. UDuctor focuses the resources offering, without losing self-management and communication supports. We implemented a system and applied it in two practical experiments. First, ten chronic patients tried the system and filled out a questionnaire based on the technology acceptance model. After this initial evaluation, an alpha test was done. The system was used daily for one month and a half by a chronic patient. The results were encouraging and show potential for implementing UDuctor in real-life situations.

  5. Integrated Systems for Education Information: A Business Plan for Managing North Carolina's Public School System. Management Summary Report.

    ERIC Educational Resources Information Center

    1984

    This report describes the North Carolina Department of Education's 5-year plan for establishing a statewide management information system. The system is intended to improve fiscal management, personnel administration, and administrative operations, and to ensure efficient resource use. Initial sections present highlights of the plan; background…

  6. Issues that Drive Waste Management Technology Development for Space Missions

    NASA Technical Reports Server (NTRS)

    Fisher, John W.; Levri, Julie A.; Hogan, John A.; Wignarajah, Kanapathipillai

    2005-01-01

    Waste management technologies for space life support systems are currently at low development levels. Manual compaction of waste in plastic bags and overboard disposal to earth return vehicles are the primary current waste management methods. Particularly on future missions, continuance of current waste management methods would tend to expose the crew to waste hazards, forfeit recoverable resources such as water, consume valuable crew time, contaminate planetary surfaces, and risk return to Earth of extraterrestrial life. Improvement of waste management capabilities is needed for adequate management of wastes. Improvements include recovery of water and other resources, conversion of waste to states harmless to humans, long-term containment of wastes, and disposal of waste. Current NASA requirements documents on waste management are generally not highly detailed. More detailed requirements are needed to guide the development of waste management technologies that will adequately manage waste. In addition to satisfying requirements, waste management technologies must also recover resources. Recovery of resources such as water and habitat volume can reduce mission cost. This paper explores the drivers for waste management technology development including requirements and resource recovery.

  7. Management System Design for a Learner Centered School.

    ERIC Educational Resources Information Center

    Wagner, Kathleen

    2000-01-01

    Examines how a learner-centered Montessori school in Toronto, Ontario, defines, specifies, and implements its management decision-support system. Findings indicate a tightly integrated management system comprised of a few student-focused decision-support elements. Identifies relationships, resources, and particular organizational arrangements as…

  8. Proceedings of the National Conference on Energy Resource Management. Volume 1: Techniques, Procedures and Data Bases

    NASA Technical Reports Server (NTRS)

    Brumfield, J. O. (Editor); Schiffman, Y. M. (Editor)

    1982-01-01

    Topics dealing with the integration of remotely sensed data with geographic information system for application in energy resources management are discussed. Associated remote sensing and image analysis techniques are also addressed.

  9. 5 CFR 9701.504 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Definitions. 9701.504 Section 9701.504 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  10. 5 CFR 9701.371 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false General. 9701.371 Section 9701.371 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  11. 5 CFR 9701.505 - Coverage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Coverage. 9701.505 Section 9701.505 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  12. 5 CFR 9701.503 - Waivers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Waivers. 9701.503 Section 9701.503 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  13. 5 CFR 9701.201 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Purpose. 9701.201 Section 9701.201 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  14. 5 CFR 9701.403 - Waivers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Waivers. 9701.403 Section 9701.403 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  15. 5 CFR 9701.404 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Definitions. 9701.404 Section 9701.404 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  16. 5 CFR 9701.304 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Definitions. 9701.304 Section 9701.304 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  17. 5 CFR 9701.501 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Purpose. 9701.501 Section 9701.501 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  18. 5 CFR 9701.303 - Waivers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Waivers. 9701.303 Section 9701.303 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  19. 5 CFR 9701.204 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Definitions. 9701.204 Section 9701.204 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  20. 5 CFR 9701.203 - Waivers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Waivers. 9701.203 Section 9701.203 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  1. 5 CFR 9701.212 - Bands.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Bands. 9701.212 Section 9701.212 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  2. 5 CFR 9701.331 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false General. 9701.331 Section 9701.331 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  3. 5 CFR 9701.341 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false General. 9701.341 Section 9701.341 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  4. 5 CFR 9701.357 - Miscellaneous.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Miscellaneous. 9701.357 Section 9701.357 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  5. 5 CFR 9701.202 - Coverage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Coverage. 9701.202 Section 9701.202 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  6. 5 CFR 9701.402 - Coverage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Coverage. 9701.402 Section 9701.402 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  7. 5 CFR 9701.302 - Coverage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Coverage. 9701.302 Section 9701.302 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  8. Integrated modeling of long-term vegetation and hydrologic dynamics in Rocky Mountain watersheds

    Treesearch

    Robert Steven Ahl

    2007-01-01

    Changes in forest structure resulting from natural disturbances, or managed treatments, can have negative and long lasting impacts on water resources. To facilitate integrated management of forest and water resources, a System for Long-Term Integrated Management Modeling (SLIMM) was developed. By combining two spatially explicit, continuous time models, vegetation...

  9. 36 CFR 219.2 - Levels of planning and responsible officials.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...

  10. 78 FR 25974 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Human Resources Command, Reclassification Management Branch, 2461 Eisenhower Avenue, Alexandria, VA... Files. System location: Commander, U.S. Army Human Resources Command, ATTN: AHRC-PED-A, 2461 Eisenhower... Human Resources Command, ATTN: AHRC-PED-A, 2461 Eisenhower Avenue, Alexandria, VA 23321-0482 for Army...

  11. Charting a Course through CORAL: Texas A&M University Libraries' Experience Implementing an Open-Source Electronic Resources Management System

    ERIC Educational Resources Information Center

    Hartnett, Eric; Beh, Eugenia; Resnick, Taryn; Ugaz, Ana; Tabacaru, Simona

    2013-01-01

    In 2010, after two previous unsuccessful attempts at electronic resources management system (ERMS) implementation, Texas A&M University (TAMU) Libraries set out once again to find an ERMS that would fit its needs. After surveying the field, TAMU Libraries selected the University of Notre Dame Hesburgh Libraries-developed, open-source ERMS,…

  12. Agent-based Modeling to Simulate the Diffusion of Water-Efficient Innovations and the Emergence of Urban Water Sustainability

    NASA Astrophysics Data System (ADS)

    Kanta, L.; Giacomoni, M.; Shafiee, M. E.; Berglund, E.

    2014-12-01

    The sustainability of water resources is threatened by urbanization, as increasing demands deplete water availability, and changes to the landscape alter runoff and the flow regime of receiving water bodies. Utility managers typically manage urban water resources through the use of centralized solutions, such as large reservoirs, which may be limited in their ability balance the needs of urbanization and ecological systems. Decentralized technologies, on the other hand, may improve the health of the water resources system and deliver urban water services. For example, low impact development technologies, such as rainwater harvesting, and water-efficient technologies, such as low-flow faucets and toilets, may be adopted by households to retain rainwater and reduce demands, offsetting the need for new centralized infrastructure. Decentralized technologies may create new complexities in infrastructure and water management, as decentralization depends on community behavior and participation beyond traditional water resources planning. Messages about water shortages and water quality from peers and the water utility managers can influence the adoption of new technologies. As a result, feedbacks between consumers and water resources emerge, creating a complex system. This research develops a framework to simulate the diffusion of water-efficient innovations and the sustainability of urban water resources, by coupling models of households in a community, hydrologic models of a water resources system, and a cellular automata model of land use change. Agent-based models are developed to simulate the land use and water demand decisions of individual households, and behavioral rules are encoded to simulate communication with other agents and adoption of decentralized technologies, using a model of the diffusion of innovation. The framework is applied for an illustrative case study to simulate water resources sustainability over a long-term planning horizon.

  13. Creation of a Book Order Management System Using a Microcomputer and a DBMS.

    ERIC Educational Resources Information Center

    Neill, Charlotte; And Others

    1985-01-01

    Describes management decisions and resultant technology-based system that allowed a medical library to meet increasing workloads without accompanying increases in resources available. Discussion covers system analysis; capabilities of book-order management system, "BOOKDIRT;" software and training; hardware; data files; data entry;…

  14. Management Matters: A Leverage Point for Health Systems Strengthening in Global Health

    PubMed Central

    Bradley, Elizabeth H.; Taylor, Lauren A.; Cuellar, Carlos J.

    2015-01-01

    Despite a renewed focus in the field of global health on strengthening health systems, inadequate attention has been directed to a key ingredient of high-performing health systems: management. We aimed to develop the argument that management – defined here as the process of achieving predetermined objectives through human, financial, and technical resources – is a cross-cutting function necessary for success in all World Health Organization (WHO) building blocks of health systems strengthening. Management within health systems is particularly critical in low-income settings where the efficient use of scarce resources is paramount to attaining health goals. More generally, investments in management capacity may be viewed as a key leverage point in grand strategy, as strong management enables the achievement of large ends with limited means. We also sought to delineate a set of core competencies and identify key roles to be targeted for management capacity building efforts. Several effective examples of management interventions have been described in the research literature. Together, the existing evidence underscores the importance of country ownership of management capacity building efforts, which often challenge the status quo and thus need country leadership to sustain despite inevitable friction. The literature also recognizes that management capacity efforts, as a key ingredient of effective systems change, take time to embed, as new protocols and ways of working become habitual and integrated as standard operating procedures. Despite these challenges, the field of health management as part of global health system strengthening efforts holds promise as a fundamental leverage point for achieving health system performance goals with existing human, technical, and financial resources. The evidence base consistently supports the role of management in performance improvement but would benefit from additional research with improved methodological rigor and longer-time horizon investigations. Meanwhile, greater emphasis on management as a critical element of global health efforts may open new and sustainable avenues for advancing health systems performance. PMID:26188805

  15. Management Matters: A Leverage Point for Health Systems Strengthening in Global Health.

    PubMed

    Bradley, Elizabeth H; Taylor, Lauren A; Cuellar, Carlos J

    2015-05-20

    Despite a renewed focus in the field of global health on strengthening health systems, inadequate attention has been directed to a key ingredient of high-performing health systems: management. We aimed to develop the argument that management - defined here as the process of achieving predetermined objectives through human, financial, and technical resources - is a cross-cutting function necessary for success in all World Health Organization (WHO) building blocks of health systems strengthening. Management within health systems is particularly critical in low-income settings where the efficient use of scarce resources is paramount to attaining health goals. More generally, investments in management capacity may be viewed as a key leverage point in grand strategy, as strong management enables the achievement of large ends with limited means. We also sought to delineate a set of core competencies and identify key roles to be targeted for management capacity building efforts. Several effective examples of management interventions have been described in the research literature. Together, the existing evidence underscores the importance of country ownership of management capacity building efforts, which often challenge the status quo and thus need country leadership to sustain despite inevitable friction. The literature also recognizes that management capacity efforts, as a key ingredient of effective systems change, take time to embed, as new protocols and ways of working become habitual and integrated as standard operating procedures. Despite these challenges, the field of health management as part of global health system strengthening efforts holds promise as a fundamental leverage point for achieving health system performance goals with existing human, technical, and financial resources. The evidence base consistently supports the role of management in performance improvement but would benefit from additional research with improved methodological rigor and longer-time horizon investigations. Meanwhile, greater emphasis on management as a critical element of global health efforts may open new and sustainable avenues for advancing health systems performance. © 2015 by Kerman University of Medical Sciences.

  16. Low-temperature plasma technology as part of a closed-loop resource management system

    NASA Technical Reports Server (NTRS)

    Hetland, Melanie D.; Rindt, John R.; Jones, Frank A.; Sauer, Randal S.

    1990-01-01

    The results of this testing indicate that the agitated low-temperature plasma reactor system successfully converted carbon, hydrogen, and nitrogen into gaseous products at residence times that were about ten times shorter than those achieved by stationary processing. The inorganic matrix present was virtually unchanged by the processing technique. It was concluded that this processing technique is feasible for use as part of a close-looped processing resource management system.

  17. Simple Linux Utility for Resource Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jette, M.

    2009-09-09

    SLURM is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for large and small computer clusters. As a cluster resource manager, SLURM has three key functions. First, it allocates exclusive and/or non exclusive access to resources (compute nodes) to users for some duration of time so they can perform work. Second, it provides a framework for starting, executing, and monitoring work (normally a parallel job) on the set of allciated nodes. Finally, it arbitrates conflicting requests for resouces by managing a queue of pending work.

  18. Batching System for Superior Service

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Veridian's Portable Batch System (PBS) was the recipient of the 1997 NASA Space Act Award for outstanding software. A batch system is a set of processes for managing queues and jobs. Without a batch system, it is difficult to manage the workload of a computer system. By bundling the enterprise's computing resources, the PBS technology offers users a single coherent interface, resulting in efficient management of the batch services. Users choose which information to package into "containers" for system-wide use. PBS also provides detailed system usage data, a procedure not easily executed without this software. PBS operates on networked, multi-platform UNIX environments. Veridian's new version, PBS Pro,TM has additional features and enhancements, including support for additional operating systems. Veridian distributes the original version of PBS as Open Source software via the PBS website. Customers can register and download the software at no cost. PBS Pro is also available via the web and offers additional features such as increased stability, reliability, and fault tolerance.A company using PBS can expect a significant increase in the effective management of its computing resources. Tangible benefits include increased utilization of costly resources and enhanced understanding of computational requirements and user needs.

  19. 5 CFR 9701.409 - Rating and rewarding performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.409 Rating and rewarding... 5 Administrative Personnel 3 2014-01-01 2014-01-01 false Rating and rewarding performance. 9701...

  20. 5 CFR 9701.409 - Rating and rewarding performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.409 Rating and rewarding... 5 Administrative Personnel 3 2012-01-01 2012-01-01 false Rating and rewarding performance. 9701...

  1. 5 CFR 9701.409 - Rating and rewarding performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.409 Rating and rewarding... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Rating and rewarding performance. 9701...

  2. 5 CFR 9701.409 - Rating and rewarding performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.409 Rating and rewarding... 5 Administrative Personnel 3 2013-01-01 2013-01-01 false Rating and rewarding performance. 9701...

  3. Command Flight Path Display. Phase I and II. Appendix F.

    DTIC Science & Technology

    1983-09-01

    AD -R145 858 COMMAND FLIGHT PATH DISPLAY PHASE I AND 11 APPENDIX F / (U) SYSTEMS ASSOCIATES INC LONG BEACH CA RESOURCE MANAGEMENT SYSTEMS DIY SEP...34- (Appendix F) .ś. SYSTEMS ASSOCIATES INC* of CALIFORNIA t. Resource Management Systems Division DTICL it~~~ll ELECTE 1 o..-- , ~SEP 2 4 1984...Availability Codos Avail and/or Dist Special "i j L i 7 7 .... Contained in this appendix are the various plots generated dur- ing data reduction. Parameters

  4. Opening the black box in nursing work and management practice: the role of ward managers.

    PubMed

    Townsend, Keith; Wilkinson, Adrian; Kellner, Ashlea

    2015-03-01

    This paper aims to identify and explore key obstacles preventing ward managers from effectively performing the human resource management (HRM) responsibilities required in their role. In the context of increasing costs and the decentralisation of responsibility to ward level, the relevance of the ward manager role within the 'black box' between human resource management and firm performance is becoming increasingly pertinent. This paper presents an intensive case study including 37 interviews across all levels of a hospital where senior management attempted to shift to a high performance model of human resource management. The findings indicated that ward managers played a critical role in maintaining and improving employee performance, although they were restricted from effectively performing their responsibilities due to budget pressure and limited managerial skill development. Our findings support the contention that hospitals would benefit from focusing on the critical role of the ward manager as the central locus of influence in high performance human resource management (HPHRM) systems. Investment into high performance human resource management is discouraged if the hospital cannot adequately enable ward managers who are responsible for implementation. Introduction of managerial skills training to potential and existing ward managers is critical. © 2013 John Wiley & Sons Ltd.

  5. Top DoD Management Challenges, Fiscal Year 2018

    DTIC Science & Technology

    2018-01-01

    Afghan Human Resource Information Management System to validate ANDSF personnel numbers and salaries; • Afghan Personnel Pay System to facilitate...unit strength accountability and personnel verification; and • Core Information Management System to improve accountability of equipment inventories...ACQUISITION AND CONTRACT MANAGEMENT Federal Acquisition Regulation requires contractor performance information be collected in the Contractor

  6. Management Information Systems in the Public Sector. A Human Resources Management Course Monograph. No. 4.

    ERIC Educational Resources Information Center

    Cerveny, Robert P.

    This curriculum guide provides an introduction to Management Information Systems (MIS) concepts and techniques for students preparing to develop MISs in professional settings, and to assist in MIS evaluation. According to the guide, students are exposed to concepts drawn from systems theory, information theory, management theory, data base…

  7. Guidelines for the Development and Implementation of a Logistic Resource Annex to the Five Year Defense Program. Volume 4. A Logistic Resource Annex for the Marine Corps Section of the DNFYP

    DTIC Science & Technology

    1978-10-01

    Information ; Logistics Planning; Management Planning and Control; Management Information Systems; Management; Military Supplies; Acquisition; JO...Arlington, Virginia 22202 Contract DAHC 15-73C-0200 Task 78-II-1 CONTENTS GLOSSARY : v SUMMARY ix I. INTRODUCTION 1 II. MARINE CORPS SUPPORT OP...Materiel Command Navy Cost Information System/FYDP Subsystem Non-Industrial Fund Non-Telecommunications Offfice of the Assistant Secretary of Defense

  8. Evolution of hemispheric specialisation of antagonistic systems of management of the body's energy resources.

    PubMed

    Braun, Claude M J

    2007-09-01

    Excellent and rich reviews of lateralised behaviour in animals have recently been published indexing renewed interest in biological theorising about hemispheric specialisation and yielding rich theory. The present review proposes a new account of the evolution of hemispheric specialisation, a primitive system of "management of the body's energy resources". This model is distinct from traditionally evoked cognitive science categories such as verbal/spatial, analytic/holistic, etc., or the current dominant neuroethological model proposing that the key is approach/avoidance behaviour. Specifically, I show that autonomic, immune, psychomotor, motivational, perceptual, and memory systems are similarly and coherently specialised in the brain hemispheres in rodents and man. This energy resource management model, extended to human neuropsychology, is termed here the "psychic tonus" model of hemispheric specialisation.

  9. Data Grid Management Systems

    NASA Technical Reports Server (NTRS)

    Moore, Reagan W.; Jagatheesan, Arun; Rajasekar, Arcot; Wan, Michael; Schroeder, Wayne

    2004-01-01

    The "Grid" is an emerging infrastructure for coordinating access across autonomous organizations to distributed, heterogeneous computation and data resources. Data grids are being built around the world as the next generation data handling systems for sharing, publishing, and preserving data residing on storage systems located in multiple administrative domains. A data grid provides logical namespaces for users, digital entities and storage resources to create persistent identifiers for controlling access, enabling discovery, and managing wide area latencies. This paper introduces data grids and describes data grid use cases. The relevance of data grids to digital libraries and persistent archives is demonstrated, and research issues in data grids and grid dataflow management systems are discussed.

  10. A System for Monitoring and Management of Computational Grids

    NASA Technical Reports Server (NTRS)

    Smith, Warren; Biegel, Bryan (Technical Monitor)

    2002-01-01

    As organizations begin to deploy large computational grids, it has become apparent that systems for observation and control of the resources, services, and applications that make up such grids are needed. Administrators must observe the operation of resources and services to ensure that they are operating correctly and they must control the resources and services to ensure that their operation meets the needs of users. Users are also interested in the operation of resources and services so that they can choose the most appropriate ones to use. In this paper we describe a prototype system to monitor and manage computational grids and describe the general software framework for control and observation in distributed environments that it is based on.

  11. Resilience-based performance metrics for water resources management under uncertainty

    NASA Astrophysics Data System (ADS)

    Roach, Tom; Kapelan, Zoran; Ledbetter, Ralph

    2018-06-01

    This paper aims to develop new, resilience type metrics for long-term water resources management under uncertain climate change and population growth. Resilience is defined here as the ability of a water resources management system to 'bounce back', i.e. absorb and then recover from a water deficit event, restoring the normal system operation. Ten alternative metrics are proposed and analysed addressing a range of different resilience aspects including duration, magnitude, frequency and volume of related water deficit events. The metrics were analysed on a real-world case study of the Bristol Water supply system in the UK and compared with current practice. The analyses included an examination of metrics' sensitivity and correlation, as well as a detailed examination into the behaviour of metrics during water deficit periods. The results obtained suggest that multiple metrics which cover different aspects of resilience should be used simultaneously when assessing the resilience of a water resources management system, leading to a more complete understanding of resilience compared with current practice approaches. It was also observed that calculating the total duration of a water deficit period provided a clearer and more consistent indication of system performance compared to splitting the deficit periods into the time to reach and time to recover from the worst deficit events.

  12. 5 CFR 9701.313 - Homeland Security Compensation Committee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Overview of Pay System § 9701.313... to provide options and/or recommendations for consideration by the Secretary or designee on strategic...

  13. Resource Management Scheme Based on Ubiquitous Data Analysis

    PubMed Central

    Lee, Heung Ki; Jung, Jaehee

    2014-01-01

    Resource management of the main memory and process handler is critical to enhancing the system performance of a web server. Owing to the transaction delay time that affects incoming requests from web clients, web server systems utilize several web processes to anticipate future requests. This procedure is able to decrease the web generation time because there are enough processes to handle the incoming requests from web browsers. However, inefficient process management results in low service quality for the web server system. Proper pregenerated process mechanisms are required for dealing with the clients' requests. Unfortunately, it is difficult to predict how many requests a web server system is going to receive. If a web server system builds too many web processes, it wastes a considerable amount of memory space, and thus performance is reduced. We propose an adaptive web process manager scheme based on the analysis of web log mining. In the proposed scheme, the number of web processes is controlled through prediction of incoming requests, and accordingly, the web process management scheme consumes the least possible web transaction resources. In experiments, real web trace data were used to prove the improved performance of the proposed scheme. PMID:25197692

  14. Values associated with management of Yellowstone cutthroat trout in Yellowstone National Park

    USGS Publications Warehouse

    Gresswell, Robert E.; Liss, W.J.

    1995-01-01

    Recent emphasis on a holistic view of natural systems and their management is associated with a growing appreciation of the role of human values in these systems. In the past, resource management has been perceived as a dichotomy between extraction (harvest) and nonconsumptive use, but this appears to be an oversimplified view of natural-cultural systems. The recreational fishery for Yellowstone cutthroat trout (Oncorhynchus clarki bouvieri) in Yellowstone National Park is an example of the effects of management on a natural-cultural system. Although angler harvest has been drastically reduced or prohibited, the recreational value of Yellowstone cutthroat trout estimated by angling factors (such as landing rate or size) ranks above that of all other sport species in Yellowstone National Park. To maintain an indigenous fishery resource of this quality with hatchery propagation is not economically or technically feasible. Nonconsumptive uses of the Yellowstone cutthroat trout including fish-watching and intangible values, such as existence demand, provide additional support for protection of wild Yellowstone cutthroat trout populations. A management strategy that reduces resource extraction has provided a means to sustain a quality recreational fishery while enhancing values associated with the protection of natural systems.

  15. 36 CFR 219.3 - Overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to... responsible for national planning. National planning includes the Forest Service national strategic plan...

  16. 5 CFR 9701.356 - Pay retention.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Pay retention. 9701.356 Section 9701.356 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  17. 5 CFR 9701.409 - Rating and rewarding performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Rating and rewarding performance. 9701.409 Section 9701.409 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES... SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.409 Rating and rewarding...

  18. 5 CFR 9701.332 - Locality rate supplements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Locality rate supplements. 9701.332 Section 9701.332 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Locality and Special Rate Supplements...

  19. 5 CFR 9701.345 - Developmental pay adjustments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Developmental pay adjustments. 9701.345 Section 9701.345 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.345...

  20. 5 CFR 9701.342 - Performance pay increases.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Performance pay increases. 9701.342 Section 9701.342 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.342...

  1. 5 CFR 9701.333 - Special rate supplements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Special rate supplements. 9701.333 Section 9701.333 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Locality and Special Rate Supplements...

  2. 5 CFR 9701.312 - Maximum rates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Maximum rates. 9701.312 Section 9701.312 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  3. 5 CFR 9701.363 - Special staffing payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Special staffing payments. 9701.363 Section 9701.363 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Special Payments § 9701.363 Special...

  4. 5 CFR 9701.311 - Major features.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Major features. 9701.311 Section 9701.311 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES...

  5. 5 CFR 9701.362 - Special assignment payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Special assignment payments. 9701.362 Section 9701.362 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Special Payments § 9701.362 Special...

  6. 36 CFR 219.13 - Coordination among Federal agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.13 Coordination among Federal agencies. The responsible official must provide early and... proposed actions; (b) For the streamlined coordination of Federal agency policies, resource management...

  7. Technology-based management of environmental organizations using an Environmental Management Information System (EMIS): Design and development

    NASA Astrophysics Data System (ADS)

    Kouziokas, Georgios N.

    2016-01-01

    The adoption of Information and Communication Technologies (ICT) in environmental management has become a significant demand nowadays with the rapid growth of environmental information. This paper presents a prototype Environmental Management Information System (EMIS) that was developed to provide a systematic way of managing environmental data and human resources of an environmental organization. The system was designed using programming languages, a Database Management System (DBMS) and other technologies and programming tools and combines information from the relational database in order to achieve the principal goals of the environmental organization. The developed application can be used to store and elaborate information regarding: human resources data, environmental projects, observations, reports, data about the protected species, environmental measurements of pollutant factors or other kinds of analytical measurements and also the financial data of the organization. Furthermore, the system supports the visualization of spatial data structures by using geographic information systems (GIS) and web mapping technologies. This paper describes this prototype software application, its structure, its functions and how this system can be utilized to facilitate technology-based environmental management and decision-making process.

  8. Estimation of crop water requirements using remote sensing for operational water resources management

    NASA Astrophysics Data System (ADS)

    Vasiliades, Lampros; Spiliotopoulos, Marios; Tzabiras, John; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-06-01

    An integrated modeling system, developed in the framework of "Hydromentor" research project, is applied to evaluate crop water requirements for operational water resources management at Lake Karla watershed, Greece. The framework includes coupled components for operation of hydrotechnical projects (reservoir operation and irrigation works) and estimation of agricultural water demands at several spatial scales using remote sensing. The study area was sub-divided into irrigation zones based on land use maps derived from Landsat 5 TM images for the year 2007. Satellite-based energy balance for mapping evapotranspiration with internalized calibration (METRIC) was used to derive actual evapotranspiration (ET) and crop coefficient (ETrF) values from Landsat TM imagery. Agricultural water needs were estimated using the FAO method for each zone and each control node of the system for a number of water resources management strategies. Two operational strategies of hydro-technical project development (present situation without operation of the reservoir and future situation with the operation of the reservoir) are coupled with three water demand strategies. In total, eight (8) water management strategies are evaluated and compared. The results show that, under the existing operational water resources management strategies, the crop water requirements are quite large. However, the operation of the proposed hydro-technical projects in Lake Karla watershed coupled with water demand management measures, like improvement of existing water distribution systems, change of irrigation methods, and changes of crop cultivation could alleviate the problem and lead to sustainable and ecological use of water resources in the study area.

  9. Integrating adaptive management and ecosystem services concepts to improve natural resource management: Challenges and opportunities

    USGS Publications Warehouse

    Epanchin-Niell, Rebecca S.; Boyd, James W.; Macauley, Molly K.; Scarlett, Lynn; Shapiro, Carl D.; Williams, Byron K.

    2018-05-07

    Executive Summary—OverviewNatural resource managers must make decisions that affect broad-scale ecosystem processes involving large spatial areas, complex biophysical interactions, numerous competing stakeholder interests, and highly uncertain outcomes. Natural and social science information and analyses are widely recognized as important for informing effective management. Chief among the systematic approaches for improving the integration of science into natural resource management are two emergent science concepts, adaptive management and ecosystem services. Adaptive management (also referred to as “adaptive decision making”) is a deliberate process of learning by doing that focuses on reducing uncertainties about management outcomes and system responses to improve management over time. Ecosystem services is a conceptual framework that refers to the attributes and outputs of ecosystems (and their components and functions) that have value for humans.This report explores how ecosystem services can be moved from concept into practice through connection to a decision framework—adaptive management—that accounts for inherent uncertainties. Simultaneously, the report examines the value of incorporating ecosystem services framing and concepts into adaptive management efforts.Adaptive management and ecosystem services analyses have not typically been used jointly in decision making. However, as frameworks, they have a natural—but to date underexplored—affinity. Both are policy and decision oriented in that they attempt to represent the consequences of resource management choices on outcomes of interest to stakeholders. Both adaptive management and ecosystem services analysis take an empirical approach to the analysis of ecological systems. This systems orientation is a byproduct of the fact that natural resource actions affect ecosystems—and corresponding societal outcomes—often across large geographic scales. Moreover, because both frameworks focus on resource systems, both must confront the analytical challenges of systems modeling—in terms of complexity, dynamics, and uncertainty.Given this affinity, the integration of ecosystem services analysis and adaptive management poses few conceptual hurdles. In this report, we synthesize discussions from two workshops that considered ways in which adaptive management approaches and ecosystem service concepts may be complementary, such that integrating them into a common framework may lead to improved natural resource management outcomes. Although the literature on adaptive management and ecosystem services is vast and growing, the report focuses specifically on the integration of these two concepts rather than aiming to provide new definitions or an indepth review or primer of the concepts individually.Key issues considered include the bidirectional links between adaptive decision making and ecosystem services, as well as the potential benefits and inevitable challenges arising in the development and use of an integrated framework. Specifically, the workshops addressed the following questions:How can application of ecosystem service analysis within an adaptive decision process improve the outcomes of management and advance understanding of ecosystem service identification, production, and valuation?How can these concepts be integrated in concept and practice?What are the constraints and challenges to integrating adaptive management and ecosystem services?And, should the integration of these concepts be moved forward to wider application—and if so, how?

  10. 75 FR 5606 - Privacy Act of 1974; Report of an Altered System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Health Resources and Services Administration Privacy Act...; and the DHHS Information Resources Management Manual, Part 6, ``ADP Systems Security.'' Retention and... Professions, Health Resources and Services Administration, Department of Health and Human Services, 5600...

  11. Monitoring trail conditions: New methodological considerations

    USGS Publications Warehouse

    Marion, Jeffrey L.; Leung, Yu-Fai; Nepal, Sanjay K.

    2006-01-01

    The U.S. National Park Service (NPS) accommodates nearly 300 million visitors per year, visitation that has the potential to produce negative effects on fragile natural and cultural resources. The policy guidance from the NPS Management Policies recognizes the legitimacy of providing opportunities for public enjoyment of parks while acknowledging the need for managers to “seek ways to avoid, or to minimize to the greatest degree practicable, adverse impacts on park resources and values” (NPS 2001). Thus, relative to visitor use, park managers must evaluate the types and extents of resource impacts associated with recreational activities, and determine to what extent they are unacceptable and constitute impairment. Visitor impact monitoring programs can assist managers in making objective evaluations of impact acceptability and impairment and in selecting effective impact management practices by providing quantitative documentation of the types and extent of recreationrelated impacts on natural resources. Monitoring programs are explicitly authorized in Section 4.1 of the Management Policies: Natural systems in the national park system, and the human influences upon them, will be monitored to detect change. The Service will use the results of monitoring and research to understand the detected change and to develop appropriate management actions.

  12. Management systems, patient quality improvement, resource availability, and substance abuse treatment quality.

    PubMed

    Fields, Dail; Roman, Paul M; Blum, Terry C

    2012-06-01

    To examine the relationships among general management systems, patient-focused quality management/continuous process improvement (TQM/CPI) processes, resource availability, and multiple dimensions of substance use disorder (SUD) treatment. Data are from a nationally representative sample of 221 SUD treatment centers through the National Treatment Center Study (NTCS). The design was a cross-sectional field study using latent variable structural equation models. The key variables are management practices, TQM/continuous quality improvement (CQI) practices, resource availability, and treatment center performance. Interviews and questionnaires provided data from treatment center administrative directors and clinical directors in 2007-2008. Patient-focused TQM/CQI practices fully mediated the relationship between internal management practices and performance. The effects of TQM/CQI on performance are significantly larger for treatment centers with higher levels of staff per patient. Internal management practices may create a setting that supports implementation of specific patient-focused practices and protocols inherent to TQM/CQI processes. However, the positive effects of internal management practices on treatment center performance occur through use of specific patient-focused TQM/CPI practices and have more impact when greater amounts of supporting resources are present. © Health Research and Educational Trust.

  13. Management Systems, Patient Quality Improvement, Resource Availability, and Substance Abuse Treatment Quality

    PubMed Central

    Fields, Dail; Roman, Paul M; Blum, Terry C

    2012-01-01

    Objective To examine the relationships among general management systems, patient-focused quality management/continuous process improvement (TQM/CPI) processes, resource availability, and multiple dimensions of substance use disorder (SUD) treatment. Data Sources/Study Setting Data are from a nationally representative sample of 221 SUD treatment centers through the National Treatment Center Study (NTCS). Study Design The design was a cross-sectional field study using latent variable structural equation models. The key variables are management practices, TQM/continuous quality improvement (CQI) practices, resource availability, and treatment center performance. Data Collection Interviews and questionnaires provided data from treatment center administrative directors and clinical directors in 2007–2008. Principal Findings Patient-focused TQM/CQI practices fully mediated the relationship between internal management practices and performance. The effects of TQM/CQI on performance are significantly larger for treatment centers with higher levels of staff per patient. Conclusions Internal management practices may create a setting that supports implementation of specific patient-focused practices and protocols inherent to TQM/CQI processes. However, the positive effects of internal management practices on treatment center performance occur through use of specific patient-focused TQM/CPI practices and have more impact when greater amounts of supporting resources are present. PMID:22098342

  14. Modelling the resource implications and budget impact of managing cow milk allergy in Australia.

    PubMed

    Guest, J F; Nagy, E

    2009-02-01

    To estimate the resource implications and budget impact of current clinical practice for managing cow milk allergy (CMA) in Australia, from the perspective of the publicly funded healthcare system. A decision model was constructed using published clinical outcomes and clinician-derived resource utilisation estimates. The model was used to estimate the expected 6-monthly levels of healthcare resource use and corresponding costs attributable to managing 6150 new CMA sufferers following referral to a specialist. The expected 6-monthly costs of managing 6150 newly-diagnosed infants with CMA following referral to a specialist was an estimated (Australian dollars, AU$) AU$6.5 million at 2006/07 prices. Clinical nutrition preparations were found to be the primary cost driver accounting for 62% of the total 6-monthly cost and clinician visits were the secondary cost driver accounting for up to a further 28% of the total 6-monthly cost. Sensitivity analysis showed there would be fewer visits to hospital-based paediatric gastroenterologists and paediatric immunologists/allergists if all newly-diagnosed patients were prescribed an amino acid formula (AAF) following referral to a specialist, instead of being managed according to current practice. CMA imposes a substantial burden on the publicly funded healthcare system in Australia. However, using an AAF as the initial treatment for CMA can potentially release limited hospital resources for alternative use within the paediatric healthcare system.

  15. An ontology-based telemedicine tasks management system architecture.

    PubMed

    Nageba, Ebrahim; Fayn, Jocelyne; Rubel, Paul

    2008-01-01

    The recent developments in ambient intelligence and ubiquitous computing offer new opportunities for the design of advanced Telemedicine systems providing high quality services, anywhere, anytime. In this paper we present an approach for building an ontology-based task-driven telemedicine system. The architecture is composed of a task management server, a communication server and a knowledge base for enabling decision makings taking account of different telemedical concepts such as actors, resources, services and the Electronic Health Record. The final objective is to provide an intelligent management of the different types of available human, material and communication resources.

  16. An operational earth resources satellite system - The Landsat follow-on program

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1977-01-01

    The Landsats 1 and 2 have demonstrated the role of remote sensing from satellite in research, development, and operational activities essential to the better management of our resources. Hundreds of agricultural, geological, hydrological, urban land use, and other investigations have raised the question of the development of an operational system providing continuous, timely data. The Landsat follow-on study addressed the economics, technological performance, and design of a system in transition from R&D to operations. Economic benefits were identified; and a complete system from sensors to the utilization in forecasting crop production, oil and mineral exploration, water resources management was designed. Benefits-to-costs ratio in present-worth dollars is at least 4:1.

  17. Assessment of reservoir system variable forecasts

    NASA Astrophysics Data System (ADS)

    Kistenmacher, Martin; Georgakakos, Aris P.

    2015-05-01

    Forecast ensembles are a convenient means to model water resources uncertainties and to inform planning and management processes. For multipurpose reservoir systems, forecast types include (i) forecasts of upcoming inflows and (ii) forecasts of system variables and outputs such as reservoir levels, releases, flood damage risks, hydropower production, water supply withdrawals, water quality conditions, navigation opportunities, and environmental flows, among others. Forecasts of system variables and outputs are conditional on forecasted inflows as well as on specific management policies and can provide useful information for decision-making processes. Unlike inflow forecasts (in ensemble or other forms), which have been the subject of many previous studies, reservoir system variable and output forecasts are not formally assessed in water resources management theory or practice. This article addresses this gap and develops methods to rectify potential reservoir system forecast inconsistencies and improve the quality of management-relevant information provided to stakeholders and managers. The overarching conclusion is that system variable and output forecast consistency is critical for robust reservoir management and needs to be routinely assessed for any management model used to inform planning and management processes. The above are demonstrated through an application from the Sacramento-American-San Joaquin reservoir system in northern California.

  18. The role of adaptive management as an operational approach for resource management agencies

    USGS Publications Warehouse

    Johnson, B.L.

    1999-01-01

    In making resource management decisions, agencies use a variety of approaches that involve different levels of political concern, historical precedence, data analyses, and evaluation. Traditional decision-making approaches have often failed to achieve objectives for complex problems in large systems, such as the Everglades or the Colorado River. I contend that adaptive management is the best approach available to agencies for addressing this type of complex problem, although its success has been limited thus far. Traditional decision-making approaches have been fairly successful at addressing relatively straightforward problems in small, replicated systems, such as management of trout in small streams or pulp production in forests. However, this success may be jeopardized as more users place increasing demands on these systems. Adaptive management has received little attention from agencies for addressing problems in small-scale systems, but I suggest that it may be a useful approach for creating a holistic view of common problems and developing guidelines that can then be used in simpler, more traditional approaches to management. Although adaptive management may be more expensive to initiate than traditional approaches, it may be less expensive in the long run if it leads to more effective management. The overall goal of adaptive management is not to maintain an optimal condition of the resource, but to develop an optimal management capacity. This is accomplished by maintaining ecological resilience that allows the system to react to inevitable stresses, and generating flexibility in institutions and stakeholders that allows managers to react when conditions change. The result is that, rather than managing for a single, optimal state, we manage within a range of acceptable outcomes while avoiding catastrophes and irreversible negative effects. Copyright ?? 1999 by The Resilience Alliance.

  19. Hybrid Platforms, Tools, and Resources

    ERIC Educational Resources Information Center

    Linder, Kathryn E.; Bruenjes, Linda S.; Smith, Sarah A.

    2017-01-01

    This chapter discusses common tools and resources for building a hybrid course in a higher education setting and provides recommendations for best practices in Learning Management Systems and Open Educational Resources.

  20. Acquisition and allocation of human, financial, and physical resources in the health care system.

    PubMed

    Abraham, Sam

    2011-01-01

    Based on the current financial status and forthcoming changes in the health care system, governing boards give chief executive officers the responsibility to manage human, financial, and physical resources. The role and degree of involvement of chief executive officers in managing resources--the resource allocation process, retention and recruitment, technology adaptation, reimbursement, and expansion of the outpatient program--are illustrated in this article. A new strategy for diverting resources to tap into the outpatient market is the appropriate direction to choose during days when the economy is down and people are not seeking inpatient treatment as in the past. Reimbursement in the future will depend on customer satisfaction scores; therefore, a dedicated and loyal staff is the most important resource for any service organization.

  1. AOIPS water resources data management system

    NASA Technical Reports Server (NTRS)

    Vanwie, P.

    1977-01-01

    The text and computer-generated displays used to demonstrate the AOIPS (Atmospheric and Oceanographic Information Processing System) water resources data management system are investigated. The system was developed to assist hydrologists in analyzing the physical processes occurring in watersheds. It was designed to alleviate some of the problems encountered while investigating the complex interrelationships of variables such as land-cover type, topography, precipitation, snow melt, surface runoff, evapotranspiration, and streamflow rates. The system has an interactive image processing capability and a color video display to display results as they are obtained.

  2. System control of an autonomous planetary mobile spacecraft

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Zimmerman, Barbara A.

    1990-01-01

    The goal is to suggest the scheduling and control functions necessary for accomplishing mission objectives of a fairly autonomous interplanetary mobile spacecraft, while maximizing reliability. Goals are to provide an extensible, reliable system conservative in its use of on-board resources, while getting full value from subsystem autonomy, and avoiding the lure of ground micromanagement. A functional layout consisting of four basic elements is proposed: GROUND and SYSTEM EXECUTIVE system functions and RESOURCE CONTROL and ACTIVITY MANAGER subsystem functions. The system executive includes six subfunctions: SYSTEM MANAGER, SYSTEM FAULT PROTECTION, PLANNER, SCHEDULE ADAPTER, EVENT MONITOR and RESOURCE MONITOR. The full configuration is needed for autonomous operation on Moon or Mars, whereas a reduced version without the planning, schedule adaption and event monitoring functions could be appropriate for lower-autonomy use on the Moon. An implementation concept is suggested which is conservative in use of system resources and consists of modules combined with a network communications fabric. A language concept termed a scheduling calculus for rapidly performing essential on-board schedule adaption functions is introduced.

  3. ERP (enterprise resource planning) systems can streamline healthcare business functions.

    PubMed

    Jenkins, E K; Christenson, E

    2001-05-01

    Enterprise resource planning (ERP) software applications are designed to facilitate the systemwide integration of complex processes and functions across a large enterprise consisting of many internal and external constituents. Although most currently available ERP applications generally are tailored to the needs of the manufacturing industry, many large healthcare systems are investigating these applications. Due to the significant differences between manufacturing and patient care, ERP-based systems do not easily translate to the healthcare setting. In particular, the lack of clinical standardization impedes the use of ERP systems for clinical integration. Nonetheless, an ERP-based system can help a healthcare organization integrate many functions, including patient scheduling, human resources management, workload forecasting, and management of workflow, that are not directly dependent on clinical decision making.

  4. A new approach to the design of information systems for foodservice management in health care facilities.

    PubMed

    Matthews, M E; Norback, J P

    1984-06-01

    An organizational framework for integrating foodservice data into an information system for management decision making is presented. The framework involves the application to foodservice of principles developed by the disciplines of managerial economics and accounting, mathematics, computer science, and information systems. The first step is to conceptualize a foodservice system from an input-output perspective, in which inputs are units of resources available to managers and outputs are servings of menu items. Next, methods of full cost accounting, from the management accounting literature, are suggested as a mechanism for developing and assigning costs of using resources within a foodservice operation. Then matrix multiplication is used to illustrate types of information that matrix data structures could make available for management planning and control when combined with a conversational mode of computer programming.

  5. Resource Management

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Summit Envirosolutions of Minneapolis, Minnesota, used remote sensing images as a source for groundwater resource management. Summit is a full-service environmental consulting service specializing in hydrogeologic, environmental management, engineering and remediation services. CRSP collected, processed and analyzed multispectral/thermal imagery and aerial photography to compare remote sensing and Geographic Information System approaches to more traditional methods of environmental impact assessments and monitoring.

  6. Natural resource assessment and decision support tools for bird conservation planning

    Treesearch

    Carl E. Korschgen; Melinda G. Knutson; Timothy J. Fox; Leslie Holland-Bartels; Henry C. Dehaan; Charles H. Theiling; Jason J. Rohweder; Kevin Kenow; Linda E. Leake; Tom Will

    2005-01-01

    We have used a place-based decision support system for several years to identify bird conservation issues relating to the management and planning needs of resource managers. Public and private land managers are constantly seeking better ways to incorporate landscape, species, and habitat relationships into the conservation planning process. The U.S. Fish and Wildlife...

  7. Changing resource management paradigms, traditional ecological knowledge, and non-timber forest products

    Treesearch

    Iain J. Davidson-Hunt; Fikret Berkes

    2001-01-01

    We begin this paper by exploring the shift now occurring in the science that provides the theoretical basis for resource management practice. The concepts of traditional ecological knowledge and traditional management systems are presented next to provide the background for an examination of resilient landscapes that emerge through the work and play of humans. These...

  8. Procedures for woody vegetation surveys in the Kazgail rural council area, Kordofan, Sudan

    USGS Publications Warehouse

    Falconer, Allan; Cross, Matthew D.; Orr, Donald G.

    1990-01-01

    Efforts to reforest parts of the Kordofan Province of Sudan are receiving support from international development agencies. These efforts include planning and implementing reforestation activities that require the collection of natural resources and socioeconomic data, and the preparation of base maps. A combination of remote sensing, geographic information system and global positioning systems procedures are used in this study to meet these requirements.Remote sensing techniques were used to provide base maps and to guide the compilation of vegetation resources maps. These techniques provided a rapid and efficient method for documenting available resources. Pocket‐sized global positioning system units were used to establish the location of field data collected for mapping and resource analysis. A microcomputer data management system tabulated and displayed the field data. The resulting system for data analysis, management, and planning has been adopted for the mapping and inventory of the Gum Belt of Sudan.

  9. Can conservation contracts co-exist with change? Payment for ecosystem services in the context of adaptive decision-making and sustainability.

    PubMed

    Hayes, Tanya; Murtinho, Felipe; Cárdenas Camacho, Luis Mario; Crespo, Patricio; McHugh, Sarah; Salmerón, David

    2015-01-01

    This paper considers the ability of payment for ecosystem services (PES) programs to operate in the context of dynamic and complex social-ecological systems. Drawing on the experiences of two different PES programs in Latin America, we examine how PES institutions fit with the tenets of adaptive decision-making for sustainable resource management. We identify how the program goals and the connection to the market influence the incentive structure, information gathering, learning and feedback processes, and the structure of decision-making rights, specifically the ability to make and modify resource-use rules. Although limited in their generalizability, findings from the two case studies suggest a tension between the contractual model of PES and adaptive decision-making in natural resource systems. PES programs are not inherently decentralized, flexible management tools, as PES contracts tend to restrict decision-making rights and offer minimal flexibility mechanisms to change resource-use practices over the duration of the contract period. Furthermore, PES design and flexibility is heavily dependent on the goals and mission of the buyer and the respective market. If PES is to facilitate sustainable resource management, greater attention is needed to assess how the institutional design of the PES contracts influence the motivation and capacity of participants and program officers alike to adaptively manage the respective resource systems.

  10. Can Conservation Contracts Co-exist with Change? Payment for Ecosystem Services in the Context of Adaptive Decision-Making and Sustainability

    NASA Astrophysics Data System (ADS)

    Hayes, Tanya; Murtinho, Felipe; Cárdenas Camacho, Luis Mario; Crespo, Patricio; McHugh, Sarah; Salmerón, David

    2015-01-01

    This paper considers the ability of payment for ecosystem services (PES) programs to operate in the context of dynamic and complex social-ecological systems. Drawing on the experiences of two different PES programs in Latin America, we examine how PES institutions fit with the tenets of adaptive decision-making for sustainable resource management. We identify how the program goals and the connection to the market influence the incentive structure, information gathering, learning and feedback processes, and the structure of decision-making rights, specifically the ability to make and modify resource-use rules. Although limited in their generalizability, findings from the two case studies suggest a tension between the contractual model of PES and adaptive decision-making in natural resource systems. PES programs are not inherently decentralized, flexible management tools, as PES contracts tend to restrict decision-making rights and offer minimal flexibility mechanisms to change resource-use practices over the duration of the contract period. Furthermore, PES design and flexibility is heavily dependent on the goals and mission of the buyer and the respective market. If PES is to facilitate sustainable resource management, greater attention is needed to assess how the institutional design of the PES contracts influence the motivation and capacity of participants and program officers alike to adaptively manage the respective resource systems.

  11. Impact of drug shortages on U.S. health systems.

    PubMed

    Kaakeh, Rola; Sweet, Burgunda V; Reilly, Cynthia; Bush, Colleen; DeLoach, Sherry; Higgins, Barb; Clark, Angela M; Stevenson, James

    2011-10-01

    A study was performed to quantify the personnel resources required to manage drug shortages, define the impact of drug shortages on health systems nationwide, and assess the adequacy of information resources available to manage drug shortages. An online survey was sent to the 1322 members of the American Society of Health-System Pharmacists who were identified as directors of pharmacy. Survey recipients were asked to identify which of the 30 most recent drug shortages listed affected their health system, to identify actions taken to manage the shortage, and to rate the impact of each shortage. Employees responsible for completing predefined tasks were identified, and the average time spent by each type of employee completing these tasks was estimated. Labor costs associated with managing shortages were calculated. A total of 353 respondents completed the survey, yielding a response rate of 27%. Pharmacists and pharmacy technicians spent more time managing drug shortages than did physicians and nurses. There was a significant association between the time spent managing shortages and the size of the institution, the number of shortages managed, and the institution's level of automation. Overall, 70% of the respondents felt that the information resources available to manage drug shortages were not good. The labor costs associated with managing shortages in the United States is an estimated $216 million annually. A survey of directors of pharmacy revealed that labor costs and the time required to manage drug shortages are significant and that current information available to manage drug shortages is considered suboptimal.

  12. Adaptive management of rangeland systems

    USGS Publications Warehouse

    Allen, Craig R.; Angeler, David G.; Fontaine, Joseph J.; Garmestani, Ahjond S.; Hart, Noelle M.; Pope, Kevin L.; Twidwell, Dirac

    2017-01-01

    Adaptive management is an approach to natural resource management that uses structured learning to reduce uncertainties for the improvement of management over time. The origins of adaptive management are linked to ideas of resilience theory and complex systems. Rangeland management is particularly well suited for the application of adaptive management, having sufficient controllability and reducible uncertainties. Adaptive management applies the tools of structured decision making and requires monitoring, evaluation, and adjustment of management. Adaptive governance, involving sharing of power and knowledge among relevant stakeholders, is often required to address conflict situations. Natural resource laws and regulations can present a barrier to adaptive management when requirements for legal certainty are met with environmental uncertainty. However, adaptive management is possible, as illustrated by two cases presented in this chapter. Despite challenges and limitations, when applied appropriately adaptive management leads to improved management through structured learning, and rangeland management is an area in which adaptive management shows promise and should be further explored.

  13. 5 CFR 9901.341 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM... supports mission accomplishment. ...

  14. 5 CFR 9901.341 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM... supports mission accomplishment. ...

  15. Structured decision making as a proactive approach to dealing with sea level rise in Florida

    USGS Publications Warehouse

    Martin, Julien; Fackler, Paul L.; Nichols, James D.; Lubow, Bruce C.; Eaton, Mitchell J.; Runge, Michael C.; Stith, Bradley M.; Langtimm, Catherine A.

    2011-01-01

    Sea level rise (SLR) projections along the coast of Florida present an enormous challenge for management and conservation over the long term. Decision makers need to recognize and adopt strategies to adapt to the potentially detrimental effects of SLR. Structured decision making (SDM) provides a rigorous framework for the management of natural resources. The aim of SDM is to identify decisions that are optimal with respect to management objectives and knowledge of the system. Most applications of SDM have assumed that the managed systems are governed by stationary processes. However, in the context of SLR it may be necessary to acknowledge that the processes underlying managed systems may be non-stationary, such that systems will be continuously changing. Therefore, SLR brings some unique considerations to the application of decision theory for natural resource management. In particular, SLR is expected to affect each of the components of SDM. For instance, management objectives may have to be reconsidered more frequently than under more stable conditions. The set of potential actions may also have to be adapted over time as conditions change. Models have to account for the non-stationarity of the modeled system processes. Each of the important sources of uncertainty in decision processes is expected to be exacerbated by SLR. We illustrate our ideas about adaptation of natural resource management to SLR by modeling a non-stationary system using a numerical example. We provide additional examples of an SDM approach for managing species that may be affected by SLR, with a focus on the endangered Florida manatee.

  16. Comparison of Overall Resource Consumption of Biosolids Management System Processes Using Exergetic Life Cycle Assessment.

    PubMed

    Alanya, Sevda; Dewulf, Jo; Duran, Metin

    2015-08-18

    This study focused on the evaluation of biosolids management systems (BMS) from a natural resource consumption point of view. Additionally, the environmental impact of the facilities was benchmarked using Life Cycle Assessment (LCA) to provide a comprehensive assessment. This is the first study to apply a Cumulative Exergy Extraction from the Natural Environment (CEENE) method for an in-depth resource use assessment of BMS where two full-scale BMS and seven system variations were analyzed. CEENE allows better system evaluation and understanding of how much benefit is achievable from the products generated by BMS, which have valorization potential. LCA results showed that environmental burden is mostly from the intense electricity consumption. The CEENE analysis further revealed that the environmental burden is due to the high consumption of fossil and nuclear-based natural resources. Using Cumulative Degree of Perfection, higher resource-use efficiency, 53%, was observed in the PTA-2 where alkaline stabilization rather than anaerobic digestion is employed. However, an anaerobic digestion process is favorable over alkaline stabilization, with 35% lower overall natural resource use. The most significant reduction of the resource footprint occurred when the output biogas was valorized in a combined heat and power system.

  17. 36 CFR 219.3 - Overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... An interdisciplinary, collaborative approach to planning may be achieved by engaging the skills and... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to...

  18. Applications of space technology to water resources management

    NASA Technical Reports Server (NTRS)

    Salomonson, V. V.

    1977-01-01

    Space technology transfer is discussed in terms of applying visible and infrared remote sensing measurement to water resources management. Mapping and monitoring of snowcovered areas, hydrologic land use, and surface water areas are discussed, using information acquired from LANDSAT and NOAA satellite systems.

  19. 5 CFR 9701.372 - Creating initial pay ranges.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Creating initial pay ranges. 9701.372 Section 9701.372 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Transitional Provisions § 9701.372 Creating...

  20. 5 CFR 9701.205 - Bar on collective bargaining.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Bar on collective bargaining. 9701.205 Section 9701.205 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Classification General § 9701.205 Bar on collective bargaining. As...

  1. Proceedings of the Annual National Conference on ADA Technology (9th) Held in Washington, DC on 4-7 March 1991

    DTIC Science & Technology

    1991-03-07

    rsolve the attack; delay whil the weapon has to wait; RESOURCE ALLOCATION . PRIORITY OF signal readiness to CONTROL; TARGETS. AND BIAS OF THE SYSTEM...Communications Systems. focal point for Computer Resource He served as project manager for the Management (CRM), Advanced Software development of the Joint...Interface Test Technology (AST), Ada Technology, Systems (JITS) - the world’s largest Joint/Army Interoperability Testing distributed command and

  2. Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger

    DTIC Science & Technology

    2012-02-13

    Operations DCMO Deputy Chief Management Officer DDRS Defense Departmental Reporting System DFAS Defense Finance and Accounting Service ERP Enterprise...for your review and comment. The Navy approved deployment of the Navy Enterprise Resource Planning ( ERP ) System without ensuring it complied with the...Comments from the Deputy Assistant Secretary of the Navy (Financial Management and Comptroller, Office of Financial Operations) and the Navy ERP Program

  3. Natural resource accounting for the National Forests: a conceptual framework.

    Treesearch

    Zhi Xu; Dennis P. Bradley; Pamela J. Jakes

    1994-01-01

    Summarizes the shortcomings of current natural resource accounting systems, outlines some of the features needed, and proposes an accounting framework that would help integrate economic and ecological factors. Such a system of forest resource accounting is urgently needed to achieve the sustainable goals of ecosystem management.

  4. Integrating health sciences library resources into course management systems.

    PubMed

    Blevins, Amy E; Inman, Megan B

    2014-01-01

    As distance education and blended learning grows, so does the need for health sciences librarians to become involved with course management systems. This article will provide some information on how to become involved with course management systems and will also provide information on a few of the more popular systems available.

  5. Linking energy-sanitation-agriculture: Intersectional resource management in smallholder households in Tanzania.

    PubMed

    Krause, Ariane; Rotter, Vera Susanne

    2017-07-15

    In order to create sustainable systems for resource management, residues from cooking and ecological sanitation (EcoSan) can be employed in recycling-driven soil fertility management. However, the link between energy, sanitation, and agricultural productivity is often neglected. Hence, the potential self-sufficient nature of many smallholdings in sub-Saharan Africa is underexploited. To compare those cooking and sanitation technologies most commonly used in north-western Tanzania with locally developed alternatives, with respect to (i) resource consumption, (ii) potential to recover resources, and (iii) environmental emissions. This study examines technologies at the household level, and was carried out using material flow analysis (MFA). The specific bioenergy technologies analysed include: three-stone fires; charcoal burners; improved cooking stoves (ICS), such as rocket and microgasifier stoves; and biogas systems. The specific sanitation alternatives studied comprise: pit latrines; two approaches to EcoSan; and septic systems. The use of ICS reduces total resource consumption; using charcoal or biogas does not. The residues from microgasifiers were analysed as having a substantial recovery potential for carbon (C) and phosphorus (P). The fact that input substrates for biogas digesters are post-agricultural in nature means that biogas slurry is not considered an 'untapped resource' despite its ample nutrient content. Exchanging pit latrines for water-based sanitation systems places heavy pressure on already scarce water resources for local smallholders. In contrast, the implementation of waterless EcoSan facilities significantly promotes nutrient recovery and reduces environmental emissions, particularly through greenhouse gas emission and nutrient leaching. Recycled outputs from the triple energy-sanitation-agriculture nexus display complementary benefits: residues from cooking can be used to restore organic matter in soils, while sanitation residues contribute to fertilisation. The combination of microgasifiers and EcoSan-facilities is the most appropriate in order to simultaneously optimise resource consumption, reduce environmental impacts, and maximise recycling-based soil management in smallholder farming systems. Copyright © 2017 Elsevier B.V. All rights reserved.

  6. Vulnerability Management for an Enterprise Resource Planning System

    NASA Astrophysics Data System (ADS)

    Goel, Shivani; Kiran, Ravi; Garg, Deepak

    2012-09-01

    Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ali, Amjad Majid; Albert, Don; Andersson, Par

    SLURM is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for large and small computer clusters. As a cluster resource manager, SLURM has three key functions. First, it allocates exclusive and/or non-exclusive access to resources (compute nodes) to users for some duration of time so they can perform work. Second, it provides a framework for starting, executing, and monitoring work 9normally a parallel job) on the set of allocated nodes. Finally, it arbitrates conflicting requests for resources by managing a queue of pending work.

  8. American Indian Agricultural Resource Management Act. Reports To Accompany H.R. 1425, from the Committee on Indian Affairs, Senate (Calendar No. 298), and from the Committee on Natural Resources, House of Representatives, 103d Congress, 1st Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Indian Affairs.

    Of the 54 million acres of Indian-owned lands held in trust by the United States, approximately 75 percent is used for agricultural production. Nevertheless, in 1993 over 1.1 million acres of Indian agricultural lands lay idle. The American Indian Agricultural Resource Management Act seeks to establish a viable system for management and…

  9. 5 CFR 9901.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM... of Defense and the Director of the Office of Personnel Management (OPM). The Secretary may establish...

  10. 5 CFR 9901.404 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Performance Management § 9901.404 Definitions. In this subpart— Appraisal means the review and...

  11. 5 CFR 9901.413 - Reconsideration of ratings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 9901.413 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Performance Management § 9901.413 Reconsideration of ratings. (a...

  12. 5 CFR 9901.101 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM... of Defense and the Director of the Office of Personnel Management (OPM). The Secretary may establish...

  13. Resolving structural uncertainty in natural resources management using POMDP approaches

    USGS Publications Warehouse

    Williams, B.K.

    2011-01-01

    In recent years there has been a growing focus on the uncertainties of natural resources management, and the importance of accounting for uncertainty in assessing management effectiveness. This paper focuses on uncertainty in resource management in terms of discrete-state Markov decision processes (MDP) under structural uncertainty and partial observability. It describes the treatment of structural uncertainty with approaches developed for partially observable resource systems. In particular, I show how value iteration for partially observable MDPs (POMDP) can be extended to structurally uncertain MDPs. A key difference between these process classes is that structurally uncertain MDPs require the tracking of system state as well as a probability structure for the structure uncertainty, whereas with POMDPs require only a probability structure for the observation uncertainty. The added complexity of the optimization problem under structural uncertainty is compensated by reduced dimensionality in the search for optimal strategy. A solution algorithm for structurally uncertain processes is outlined for a simple example in conservation biology. By building on the conceptual framework developed for POMDPs, natural resource analysts and decision makers who confront structural uncertainties in natural resources can take advantage of the rapid growth in POMDP methods and approaches, and thereby produce better conservation strategies over a larger class of resource problems. ?? 2011.

  14. Sharing Service Resource Information for Application Integration in a Virtual Enterprise - Modeling the Communication Protocol for Exchanging Service Resource Information

    NASA Astrophysics Data System (ADS)

    Yamada, Hiroshi; Kawaguchi, Akira

    Grid computing and web service technologies enable us to use networked resources in a coordinated manner. An integrated service is made of individual services running on coordinated resources. In order to achieve such coordinated services autonomously, the initiator of a coordinated service needs to know detailed service resource information. This information ranges from static attributes like the IP address of the application server to highly dynamic ones like the CPU load. The most famous wide-area service discovery mechanism based on names is DNS. Its hierarchical tree organization and caching methods take advantage of the static information managed. However, in order to integrate business applications in a virtual enterprise, we need a discovery mechanism to search for the optimal resources based on the given a set of criteria (search keys). In this paper, we propose a communication protocol for exchanging service resource information among wide-area systems. We introduce the concept of the service domain that consists of service providers managed under the same management policy. This concept of the service domain is similar to that for autonomous systems (ASs). In each service domain, the service information provider manages the service resource information of service providers that exist in this service domain. The service resource information provider exchanges this information with other service resource information providers that belong to the different service domains. We also verified the protocol's behavior and effectiveness using a simulation model developed for proposed protocol.

  15. Groundwater footprint methodology as policy tool for balancing water needs (agriculture & tourism) in water scarce islands - The case of Crete, Greece.

    PubMed

    Kourgialas, Nektarios N; Karatzas, George P; Dokou, Zoi; Kokorogiannis, Andreas

    2018-02-15

    In many Mediterranean islands with limited surface water resources, the growth of agricultural and touristic sectors, which are the main water consumers, highly depends on the sustainable water resources management. This work highlights the crucial role of groundwater footprint (GF) as a tool for the sustainable management of water resources, especially in water scarce islands. The groundwater footprint represents the water budget between inflows and outflows in an aquifer system and is used as an index of the effect of groundwater use in natural resources and environmental flows. The case study presented in this paper is the island of Crete, which consists of 11 main aquifer systems. The data used for estimating the groundwater footprint in each system were groundwater recharges, abstractions through 412 wells, environmental flows (discharges) from 76 springs and 19 streams present in the area of study. The proposed methodology takes into consideration not only the water quantity but also the water quality of the aquifer systems and can be used as an integrated decision making tool for the sustainable management of groundwater resources. This methodology can be applied in any groundwater system. The results serve as a tool for assessing the potential of sustainable use and the optimal distribution of water needs under the current and future climatic conditions, considering both quantitative and qualitative factors. Adaptation measures and water policies that will effectively promote sustainable development are also proposed for the management of the aquifer systems that exhibit a large groundwater footprint. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Columbus system support for telescience operations

    NASA Technical Reports Server (NTRS)

    Lytton, David W.; Schulze, Rolf

    1993-01-01

    With the given constraints of the space environment, the telescience concept aims at providing a space mission user with optimum flexibility and responsiveness for spaceborne investigations. The concept includes automated system management functions, which allocate and monitor planned resources and time windows, within which the investigator can perform his science interactively responding 'on-line' to experimental data. During the telescience operation, the user is given the capability to send telecommands to the payload from the User Home Base with transparency to the rest of the system. Any violation of the 'booked' time and resources will be detected by the system and reported back to the user for appropriate action. Ultimately, the system will react to maintain the integrity of the system and its payload. Upon completion of the telescience session, the system management function reverses the system configuration and deallocates resources automatically.

  17. Open Source GIS based integrated watershed management

    NASA Astrophysics Data System (ADS)

    Byrne, J. M.; Lindsay, J.; Berg, A. A.

    2013-12-01

    Optimal land and water management to address future and current resource stresses and allocation challenges requires the development of state-of-the-art geomatics and hydrological modelling tools. Future hydrological modelling tools should be of high resolution, process based with real-time capability to assess changing resource issues critical to short, medium and long-term enviromental management. The objective here is to merge two renowned, well published resource modeling programs to create an source toolbox for integrated land and water management applications. This work will facilitate a much increased efficiency in land and water resource security, management and planning. Following an 'open-source' philosophy, the tools will be computer platform independent with source code freely available, maximizing knowledge transfer and the global value of the proposed research. The envisioned set of water resource management tools will be housed within 'Whitebox Geospatial Analysis Tools'. Whitebox, is an open-source geographical information system (GIS) developed by Dr. John Lindsay at the University of Guelph. The emphasis of the Whitebox project has been to develop a user-friendly interface for advanced spatial analysis in environmental applications. The plugin architecture of the software is ideal for the tight-integration of spatially distributed models and spatial analysis algorithms such as those contained within the GENESYS suite. Open-source development extends knowledge and technology transfer to a broad range of end-users and builds Canadian capability to address complex resource management problems with better tools and expertise for managers in Canada and around the world. GENESYS (Generate Earth Systems Science input) is an innovative, efficient, high-resolution hydro- and agro-meteorological model for complex terrain watersheds developed under the direction of Dr. James Byrne. GENESYS is an outstanding research and applications tool to address challenging resource management issues in industry, government and nongovernmental agencies. Current research and analysis tools were developed to manage meteorological, climatological, and land and water resource data efficiently at high resolution in space and time. The deliverable for this work is a Whitebox-GENESYS open-source resource management capacity with routines for GIS based watershed management including water in agriculture and food production. We are adding urban water management routines through GENESYS in 2013-15 with an engineering PhD candidate. Both Whitebox-GAT and GENESYS are already well-established tools. The proposed research will combine these products to create an open-source geomatics based water resource management tool that is revolutionary in both capacity and availability to a wide array of Canadian and global users

  18. Autonomous self-organizing resource manager for multiple networked platforms

    NASA Astrophysics Data System (ADS)

    Smith, James F., III

    2002-08-01

    A fuzzy logic based expert system for resource management has been developed that automatically allocates electronic attack (EA) resources in real-time over many dissimilar autonomous naval platforms defending their group against attackers. The platforms can be very general, e.g., ships, planes, robots, land based facilities, etc. Potential foes the platforms deal with can also be general. This paper provides an overview of the resource manager including the four fuzzy decision trees that make up the resource manager; the fuzzy EA model; genetic algorithm based optimization; co-evolutionary data mining through gaming; and mathematical, computational and hardware based validation. Methods of automatically designing new multi-platform EA techniques are considered. The expert system runs on each defending platform rendering it an autonomous system requiring no human intervention. There is no commanding platform. Instead the platforms work cooperatively as a function of battlespace geometry; sensor data such as range, bearing, ID, uncertainty measures for sensor output; intelligence reports; etc. Computational experiments will show the defending networked platform's ability to self- organize. The platforms' ability to self-organize is illustrated through the output of the scenario generator, a software package that automates the underlying data mining problem and creates a computer movie of the platforms' interaction for evaluation.

  19. A combined linear optimisation methodology for water resources allocation in Alfeios River Basin (Greece) under uncertain and vague system conditions

    NASA Astrophysics Data System (ADS)

    Bekri, Eleni; Yannopoulos, Panayotis; Disse, Markus

    2013-04-01

    In the present study, a combined linear programming methodology, based on Li et al. (2010) and Bekri et al. (2012), is employed for optimizing water allocation under uncertain system conditions in the Alfeios River Basin, in Greece. The Alfeios River is a water resources system of great natural, ecological, social and economic importance for Western Greece, since it has the longest and highest flow rate watercourse in the Peloponnisos region. Moreover, the river basin was exposed in the last decades to a plethora of environmental stresses (e.g. hydrogeological alterations, intensively irrigated agriculture, surface and groundwater overexploitation and infrastructure developments), resulting in the degradation of its quantitative and qualitative characteristics. As in most Mediterranean countries, water resource management in Alfeios River Basin has been focused up to now on an essentially supply-driven approach. It is still characterized by a lack of effective operational strategies. Authority responsibility relationships are fragmented, and law enforcement and policy implementation are weak. The present regulated water allocation puzzle entails a mixture of hydropower generation, irrigation, drinking water supply and recreational activities. Under these conditions its water resources management is characterised by high uncertainty and by vague and imprecise data. The considered methodology has been developed in order to deal with uncertainties expressed as either probability distributions, or/and fuzzy boundary intervals, derived by associated α-cut levels. In this framework a set of deterministic submodels is studied through linear programming. The ad hoc water resources management and alternative management patterns in an Alfeios subbasin are analyzed and evaluated under various scenarios, using the above mentioned methodology, aiming to promote a sustainable and equitable water management. Li, Y.P., Huang, G.H. and S.L., Nie, (2010), Planning water resources management systems using a fuzzy-boundary interval-stochastic programming method, Elsevier Ltd, Advances in Water Resources, 33: 1105-1117. doi:10.1016/j.advwatres.2010.06.015 Bekri, E.S., Disse, M. and P.C.,Yannopoulos, (2012), Methodological framework for correction of quick river discharge measurements using quality characteristics, Session of Environmental Hydraulics - Hydrodynamics, 2nd Common Conference of Hellenic Hydrotechnical Association and Greek Committee for Water Resources Management, Volume: 546-557 (in Greek).

  20. Workshop in a Box: Sustainable Management of Rural and Small Water and Wastewater Systems Workshops

    EPA Pesticide Factsheets

    A resource to help rural and small systems and communities to conduct workshops, either for an individual system or for a group of systems, based on the Rural and Small Systems Guidebook to Sustainable Utility Management.

  1. Guiding climate change adaptation within vulnerable natural resource management systems.

    PubMed

    Bardsley, Douglas K; Sweeney, Susan M

    2010-05-01

    Climate change has the potential to compromise the sustainability of natural resources in Mediterranean climatic systems, such that short-term reactive responses will increasingly be insufficient to ensure effective management. There is a simultaneous need for both the clear articulation of the vulnerabilities of specific management systems to climate risk, and the development of appropriate short- and long-term strategic planning responses that anticipate environmental change or allow for sustainable adaptive management in response to trends in resource condition. Governments are developing climate change adaptation policy frameworks, but without the recognition of the importance of responding strategically, regional stakeholders will struggle to manage future climate risk. In a partnership between the South Australian Government, the Adelaide and Mt Lofty Ranges Natural Resource Management Board and the regional community, a range of available research approaches to support regional climate change adaptation decision-making, were applied and critically examined, including: scenario modelling; applied and participatory Geographical Information Systems modelling; environmental risk analysis; and participatory action learning. As managers apply ideas for adaptation within their own biophysical and socio-cultural contexts, there would be both successes and failures, but a learning orientation to societal change will enable improvements over time. A base-line target for regional responses to climate change is the ownership of the issue by stakeholders, which leads to an acceptance that effective actions to adapt are now both possible and vitally important. Beyond such baseline knowledge, the research suggests that there is a range of tools from the social and physical sciences available to guide adaptation decision-making.

  2. Guiding Climate Change Adaptation Within Vulnerable Natural Resource Management Systems

    NASA Astrophysics Data System (ADS)

    Bardsley, Douglas K.; Sweeney, Susan M.

    2010-05-01

    Climate change has the potential to compromise the sustainability of natural resources in Mediterranean climatic systems, such that short-term reactive responses will increasingly be insufficient to ensure effective management. There is a simultaneous need for both the clear articulation of the vulnerabilities of specific management systems to climate risk, and the development of appropriate short- and long-term strategic planning responses that anticipate environmental change or allow for sustainable adaptive management in response to trends in resource condition. Governments are developing climate change adaptation policy frameworks, but without the recognition of the importance of responding strategically, regional stakeholders will struggle to manage future climate risk. In a partnership between the South Australian Government, the Adelaide and Mt Lofty Ranges Natural Resource Management Board and the regional community, a range of available research approaches to support regional climate change adaptation decision-making, were applied and critically examined, including: scenario modelling; applied and participatory Geographical Information Systems modelling; environmental risk analysis; and participatory action learning. As managers apply ideas for adaptation within their own biophysical and socio-cultural contexts, there would be both successes and failures, but a learning orientation to societal change will enable improvements over time. A base-line target for regional responses to climate change is the ownership of the issue by stakeholders, which leads to an acceptance that effective actions to adapt are now both possible and vitally important. Beyond such baseline knowledge, the research suggests that there is a range of tools from the social and physical sciences available to guide adaptation decision-making.

  3. Management Information System Project.

    ERIC Educational Resources Information Center

    Foley, Walter J.; Harr, Gordon G.

    The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…

  4. The GRIN-Global Information Management System – A Preview and Opportunity for Public User Input

    USDA-ARS?s Scientific Manuscript database

    The GRIN-Global Information Management System, under development for the past two years, will provide the world's crop genebanks and plant genetic resource (PGR) users with a powerful, flexible, easy-to-use PGR information management system. Developed jointly by the USDA Agricultural Research Servi...

  5. The GRIN-Global Information Management System – Public Interface Demonstration and Input Opportunity

    USDA-ARS?s Scientific Manuscript database

    The GRIN-Global (GG) Information Management System, under development for the past three years, provides the world's crop genebanks and plant genetic resource (PGR) users with a powerful, flexible, easy-to-use PGR information management system. Developed jointly by the USDA Agricultural Research Ser...

  6. Mature data transport and command management services for the Space Station

    NASA Technical Reports Server (NTRS)

    Carper, R. D.

    1986-01-01

    The duplex space/ground/space data services for the Space Station are described. The need to separate the uplink data service functions from the command functions is discussed. Command management is a process shared by an operation control center and a command management system and consists of four functions: (1) uplink data communications, (2) management of the on-board computer, (3) flight resource allocation and management, and (4) real command management. The new data service capabilities provided by microprocessors, ground and flight nodes, and closed loop and open loop capabilities are studied. The need for and functions of a flight resource allocation management service are examined. The system is designed so only users can access the system; the problems encountered with open loop uplink access are analyzed. The procedures for delivery of operational, verification, computer, and surveillance and monitoring data directly to users are reviewed.

  7. Information in the Water and Sanitation Sector.

    ERIC Educational Resources Information Center

    Rodda, John C.; And Others

    1994-01-01

    Includes 17 articles on aspects of collecting, managing, and disseminating data about the world's water supply and use. Topics addressed include United Nations agencies involved with water resources; management information systems; providing information needed by water resources professionals; and the role of regional organizations in providing…

  8. Water and society: Interdisciplinary education in natural resources

    USDA-ARS?s Scientific Manuscript database

    Natural resource management and education must account for both the natural and human components of a complex system, yet examples of such interdisciplinary approaches are still relatively rare, especially in education. This study discusses a graduate seminar on water management, developed from an i...

  9. 5 CFR 9701.354 - Setting pay upon demotion.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Setting pay upon demotion. 9701.354 Section 9701.354 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Pay Administration § 9701.354 Setting pay...

  10. 5 CFR 9701.305 - Bar on collective bargaining.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Bar on collective bargaining. 9701.305 Section 9701.305 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration General § 9701.305 Bar on collective...

  11. 5 CFR 9701.344 - Special within-band increases.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Special within-band increases. 9701.344 Section 9701.344 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Performance-Based Pay § 9701.344 Special...

  12. 5 CFR 9701.353 - Setting pay upon promotion.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Setting pay upon promotion. 9701.353 Section 9701.353 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Pay Administration § 9701.353 Setting pay...

  13. Integrating fisheries approaches and household utility models for improved resource management.

    PubMed

    Milner-Gulland, E J

    2011-01-25

    Natural resource management is littered with cases of overexploitation and ineffectual management, leading to loss of both biodiversity and human welfare. Disciplinary boundaries stifle the search for solutions to these issues. Here, I combine the approach of management strategy evaluation, widely applied in fisheries, with household utility models from the conservation and development literature, to produce an integrated framework for evaluating the effectiveness of competing management strategies for harvested resources against a range of performance metrics. I demonstrate the strengths of this approach with a simple model, and use it to examine the effect of manager ignorance of household decisions on resource management effectiveness, and an allocation tradeoff between monitoring resource stocks to reduce observation uncertainty and monitoring users to improve compliance. I show that this integrated framework enables management assessments to consider household utility as a direct metric for system performance, and that although utility and resource stock conservation metrics are well aligned, harvest yield is a poor proxy for both, because it is a product of household allocation decisions between alternate livelihood options, rather than an end in itself. This approach has potential far beyond single-species harvesting in situations where managers are in full control; I show that the integrated approach enables a range of management intervention options to be evaluated within the same framework.

  14. The Huaihe Basin Water Resource and Water Quality Management Platform Implemented with a Spatio-Temporal Data Model

    NASA Astrophysics Data System (ADS)

    Liu, Y.; Zhang, W.; Yan, C.

    2012-07-01

    Presently, planning and assessment in maintenance, renewal and decision-making for watershed hydrology, water resource management and water quality assessment are evolving toward complex, spatially explicit regional environmental assessments. These problems have to be addressed with object-oriented spatio-temporal data models that can restore, manage, query and visualize various historic and updated basic information concerning with watershed hydrology, water resource management and water quality as well as compute and evaluate the watershed environmental conditions so as to provide online forecasting to police-makers and relevant authorities for supporting decision-making. The extensive data requirements and the difficult task of building input parameter files, however, has long been an obstacle to use of such complex models timely and effectively by resource managers. Success depends on an integrated approach that brings together scientific, education and training advances made across many individual disciplines and modified to fit the needs of the individuals and groups who must write, implement, evaluate, and adjust their watershed management plans. The centre for Hydro-science Research, Nanjing University, in cooperation with the relevant watershed management authorities, has developed a WebGIS management platform to facilitate this complex process. Improve the management of watersheds over the Huaihe basin through the development, promotion and use of a web-based, user-friendly, geospatial watershed management data and decision support system (WMDDSS) involved many difficulties for the development of this complicated System. In terms of the spatial and temporal characteristics of historic and currently available information on meteorological, hydrological, geographical, environmental and other relevant disciplines, we designed an object-oriented spatiotemporal data model that combines spatial, attribute and temporal information to implement the management system. Using this system, we can update, query and analyze environmental information as well as manage historical data, and a visualization tool was provided to help the user interpret results so as to provide scientific support for decision-making. The utility of the system has been demonstrated its values by being used in watershed management and environmental assessments.

  15. Analysis of eighty-four commercial aviation incidents - Implications for a resource management approach to crew training

    NASA Technical Reports Server (NTRS)

    Murphy, M. R.

    1980-01-01

    A resource management approach to aircrew performance is defined and utilized in structuring an analysis of 84 exemplary incidents from the NASA Aviation Safety Reporting System. The distribution of enabling and associated (evolutionary) and recovery factors between and within five analytic categories suggests that resource management training be concentrated on: (1) interpersonal communications, with air traffic control information of major concern; (2) task management, mainly setting priorities and appropriately allocating tasks under varying workload levels; and (3) planning, coordination, and decisionmaking concerned with preventing and recovering from potentially unsafe situations in certain aircraft maneuvers.

  16. From staff-mix to skill-mix and beyond: towards a systemic approach to health workforce management

    PubMed Central

    2009-01-01

    Throughout the world, countries are experiencing shortages of health care workers. Policy-makers and system managers have developed a range of methods and initiatives to optimise the available workforce and achieve the right number and mix of personnel needed to provide high-quality care. Our literature review found that such initiatives often focus more on staff types than on staff members' skills and the effective use of those skills. Our review describes evidence about the benefits and pitfalls of current approaches to human resources optimisation in health care. We conclude that in order to use human resources most effectively, health care organisations must consider a more systemic approach - one that accounts for factors beyond narrowly defined human resources management practices and includes organisational and institutional conditions. PMID:20021682

  17. System Sketch: A Visualization Tool to Improve Community Decision Making

    EPA Science Inventory

    Making decisions in coastal and estuarine management requires a comprehensive understanding of the linkages between environmental, social, and economic systems. SystemSketch is a web-based scoping tool designed to assist resource managers in characterizing their systems, explorin...

  18. A survey of university students' perceptions of learning management systems in a low-resource setting using a technology acceptance model.

    PubMed

    Chipps, Jennifer; Kerr, Jane; Brysiewicz, Petra; Walters, Fiona

    2015-02-01

    Learning management systems have been widely advocated for the support of distance learning. In low-resource settings, the uptake of these systems by students has been mixed. This study aimed to identify, through the use of the Technology Acceptance Model, the individual, organizational, and technological factors that could be influencing the use of learning management systems. A simple quantitative descriptive survey was conducted of nursing and health science students at a university in South Africa as part of their first exposure to a learning management system. A total of 274 respondents (56.7%) completed the survey questionnaire, made up of 213 nursing respondents (87.7%) and 61 health sciences respondents (25%). Overall, the respondents found the learning management system easy to use and useful for learning. There were significant differences between the two groups of respondents, with the respondents from health sciences being both younger and more computer literate. The nursing respondents, who received more support and orientations, reported finding the learning management system more useful. Recommendations are made for training and support to ensure uptake.

  19. 5 CFR 9901.356 - Pay retention.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM... employee who would not be affected personally requests a reduction in band; (ii) Management determines the...

  20. 5 CFR 9901.407 - Minimum period of performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 9901.407 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Performance Management § 9901.407 Minimum period of performance. (a) Only...

  1. 5 CFR 9901.406 - Setting and communicating performance expectations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... expectations. 9901.406 Section 9901.406 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM (NSPS) Performance Management § 9901.406 Setting and...

  2. Adaptive Regulation of the Northern California Reservoir System for Water, Energy, and Environmental Management

    NASA Astrophysics Data System (ADS)

    Georgakakos, A. P.; Kistenmacher, M.; Yao, H.; Georgakakos, K. P.

    2014-12-01

    The 2014 National Climate Assessment of the US Global Change Research Program emphasizes that water resources managers and planners in most US regions will have to cope with new risks, vulnerabilities, and opportunities, and recommends the development of adaptive capacity to effectively respond to the new water resources planning and management challenges. In the face of these challenges, adaptive reservoir regulation is becoming all the more ncessary. Water resources management in Northern California relies on the coordinated operation of several multi-objective reservoirs on the Trinity, Sacramento, American, Feather, and San Joaquin Rivers. To be effective, reservoir regulation must be able to (a) account for forecast uncertainty; (b) assess changing tradeoffs among water uses and regions; and (c) adjust management policies as conditions change; and (d) evaluate the socio-economic and environmental benefits and risks of forecasts and policies for each region and for the system as a whole. The Integrated Forecast and Reservoir Management (INFORM) prototype demonstration project operated in Northern California through the collaboration of several forecast and management agencies has shown that decision support systems (DSS) with these attributes add value to stakeholder decision processes compared to current, less flexible management practices. Key features of the INFORM DSS include: (a) dynamically downscaled operational forecasts and climate projections that maintain the spatio-temporal coherence of the downscaled land surface forcing fields within synoptic scales; (b) use of ensemble forecast methodologies for reservoir inflows; (c) assessment of relevant tradeoffs among water uses on regional and local scales; (d) development and evaluation of dynamic reservoir policies with explicit consideration of hydro-climatic forecast uncertainties; and (e) focus on stakeholder information needs.This article discusses the INFORM integrated design concept, underlying methodologies, and selected applications with the California water resources system.

  3. Quality management of human resources. Providers should begin by focusing on education, performance management, and reward systems.

    PubMed

    Blair, C S; Fordyce, M; Barney, S M

    1993-10-01

    For a quality management transformation to occur, a healthcare organization must focus on education and development, performance management, and recognition and reward systems during the first years of implementation. Education and development are perhaps the most important human resource management functions when implementing quality management principles and processes because behavioral changes will be required at all organizational levels. Specific programs that support an organization's quality management effort will vary but should include the conceptual, cultural, and technical aspects of quality management. The essence of quality management is to always satisfy the customer and to continuously improve the services and products the organization offers. The approach to performance management should therefore rely on customer feedback and satisfaction. An organization committed to quality management should base its performance management approach on customer orientation, process improvement, employee involvement, decision making with data, and continuous improvement. Managers and trustees are being challenged to provide innovative recognition and reward systems that reinforce the values and behaviors consistent with quality management. Such systems must also be aligned with the behaviors and outcomes that support the philosophy, mission, and values of the Catholic healthcare ministry. The following components should be considered for a recognition and reward system: base pay, incentives, benefits, and nonmonetary rewards.

  4. The ABC's required for establishing a practical computerized plant engineering management data base system

    NASA Technical Reports Server (NTRS)

    Maiocco, F. R.; Hume, J. P.

    1976-01-01

    A system's approach is outlined in the paper to assist facility and Plant Engineers improve their organization's data management system. The six basic steps identified may appear somewhat simple; however, adequate planning, proper resources, and the involvement of management will determine the success of a computerized facility management data base. Helpful suggestions are noted throughout the paper to insure the development of a practical computerized data management system.

  5. Drainage facility management system : final report, June 2009.

    DOT National Transportation Integrated Search

    2009-06-01

    This research project identified requirements for a drainage facility management system for the Oregon Department of Transportation. It also estimated the personnel resources needed to collect the inventory to populate such a system with data. A tota...

  6. The impact of earth resources exploration from space

    NASA Technical Reports Server (NTRS)

    Nordberg, W.

    1976-01-01

    Remote sensing of the earth from satellite systems such as Landsat, Nimbus, and Skylab has demonstrated the potential influence of such observations on a number of major human concerns. These concerns include the management of food, water and fiber resources, the exploration and management of mineral and energy resources, the protection of the environment, the protection of life and property, and improvements in shipping and navigation.

  7. Visitor experience and resource protection framework in the National Park System: rationale, current status, and future direction

    Treesearch

    Marilyn Hof; David W. Lime

    1997-01-01

    The Visitor Experience and Resource Protection (VERP) framework was developed by the National Park Service to address carrying capacity questions associated with visitation-related resource impacts and impacts to the quality of visitor experiences. The framework can be applied as part of a park’s general management planning process (general management plans, GMPs), to...

  8. Assessment of nursing management and utilization of nursing resources with the RAFAELA patient classification system--case study from the general wards of one central hospital.

    PubMed

    Rainio, Anna-Kaisa; Ohinmaa, Arto E

    2005-07-01

    RAFAELA is a new Finnish PCS, which is used in several University Hospitals and Central Hospitals and has aroused considerable interest in hospitals in Europe. The aim of the research is firstly to assess the feasibility of the RAFAELA Patient Classification System (PCS) in nursing staff management and, secondly, whether it can be seen as the transferring of nursing resources between wards according to the information received from nursing care intensity classification. The material was received from the Central Hospital's 12 general wards between 2000 and 2001. The RAFAELA PCS consists of three different measures: a system measuring patient care intensity, a system recording daily nursing resources, and a system measuring the optimal nursing care intensity/nurse situation. The data were analysed in proportion to the labour costs of nursing work and, from that, we calculated the employer's loss (a situation below the optimal level) and savings (a situation above the optimal level) per ward as both costs and the number of nurses. In 2000 the wards had on average 77 days below the optimal level and 106 days above it. In 2001 the wards had on average 71 days below the optimal level and 129 above it. Converting all these days to monetary and personnel resources the employer lost 307,745 or 9.84 nurses and saved 369,080 or 11.80 nurses in total in 2000. In 2001 the employer lost in total 242,143 or 7.58 nurses and saved 457,615 or 14.32 nurses. During the time period of the research nursing resources seemed not have been transferred between wards. RAFAELA PCS is applicable to the allocation of nursing resources but its possibilities have not been entirely used in the researched hospital. The management of nursing work should actively use the information received in nursing care intensity classification and plan and implement the transferring of nursing resources in order to ensure the quality of patient care. Information on which units resources should be allocated to is needed in the planning of staff resources of the whole hospital. More resources do not solve the managerial problem of the right allocation of resources. If resources are placed wrongly, the problems of daily staff management and cost control continue.

  9. Information Resources Management. A Bibliography with Indexes, 1984-1989. A Selection of Annotated References to Reports and Journal Articles Entered into the NASA Scientific and Technical Information System from 1984 through 1989.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC. Scientific and Technical Information Branch.

    This information resources management (IRM) bibliography provides abstracts of reports and journal articles entered in the National Aeronautics and Space Administration (NASA) scientific and technical information system over a 6-year period. These abstracts are presented in 10 areas: (1) IRM activities and planning; (2) computers,…

  10. Measuring Malaysia School Resource Centers' Standards through iQ-PSS: An Online Management Information System

    ERIC Educational Resources Information Center

    Zainudin, Fadzliaton; Ismail, Kamarulzaman

    2010-01-01

    The Ministry of Education has come up with an innovative way to monitor the progress of 9,843 School Resource Centers (SRCs) using an online management information system called iQ-PSS (Quality Index of SRC). This paper aims to describe the data collection method and analyze the current state of SRCs in Malaysia and explain how the results can be…

  11. DMS Advanced Applications for Accommodating High Penetrations of DERs and Microgrids: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, Annabelle; Veda, Santosh; Maitra, Arindam

    Efficient and effective management of the electrical distribution system requires an integrated system approach for Distribution Management Systems (DMS), Distributed Energy Resources (DERs), Distributed Energy Resources Management System (DERMS), and microgrids to work in harmony. This paper highlights some of the outcomes from a U.S. Department of Energy (DOE), Office of Electricity (OE) project, including 1) Architecture of these integrated systems, and 2) Expanded functions of two example DMS applications, Volt-VAR optimization (VVO) and Fault Location, Isolation and Service Restoration (FLISR), to accommodate DER. For these two example applications, the relevant DER Group Functions necessary to support communication between DMSmore » and Microgrid Controller (MC) in grid-tied mode are identified.« less

  12. DMS Advanced Applications for Accommodating High Penetrations of DERs and Microgrids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, Annabelle; Veda, Santosh; Maitra, Arindam

    Efficient and effective management of the electric distribution system requires an integrated approach to allow various systems to work in harmony, including distribution management systems (DMS), distributed energy resources (DERs), distributed energy resources management systems, and microgrids. This study highlights some outcomes from a recent project sponsored by the US Department of Energy, Office of Electricity Delivery and Energy Reliability, including information about (i) the architecture of these integrated systems and (ii) expanded functions of two example DMS applications to accommodate DERs: volt-var optimisation and fault location, isolation, and service restoration. In addition, the relevant DER group functions necessary tomore » support communications between the DMS and a microgrid controller in grid-tied mode are identified.« less

  13. Climate Change Adaptation in the Western U.S.: the Case for Dynamic Rule Curves in Water Resources Management

    NASA Astrophysics Data System (ADS)

    Lee, S.; Hamlet, A. F.; Burges, S. J.

    2008-12-01

    Climate change in the Western U.S. will bring systematic hydrologic changes affecting many water resources systems. Successful adaptation to these changes, which will be ongoing through the 21st century, will require the 'rebalancing' of competing system objectives such as water supply, flood control, hydropower production, and environmental services in response to hydrologic (and other) changes. Although fixed operating policies for the operation of reservoirs has been a traditional approach to water management in the 20th century, the rapid pace of projected climate shifts (~0.5 F per decade), and the prohibitive costs of recursive policy intervention to mitigate impacts, suggest that more sophisticated approaches will be needed to cope with climate change on a long term basis. The use of 'dynamic rule curves' is an approach that maintains some of the key characteristics of current water management practice (reservoir rule curves) while avoiding many of the fundamental drawbacks of traditional water resources management strategies in a non-stationary climate. In this approach, water resources systems are optimized for each operational period using ensemble streamflow and/or water demand forecasts. The ensemble of optimized reservoir storage traces are then analyzed to produce a set of unique reservoir rule curves for each operational period reflecting the current state of the system. The potential advantage of this approach is that hydrologic changes associated with climate change (such as systematically warmer temperatures) can be captured explicitly in operational hydrologic forecasts, which would in turn inform the optimized reservoir management solutions, creating water resources systems that are largely 'self tending' as the climate system evolves. Furthermore, as hydrologic forecasting systems improve (e.g. in response to improved ENSO forecasting or other scientific advances), so does the performance of reservoir operations. An example of the approach is given for flood control in the Columbia River basin.

  14. Learning Management System Success: Increasing Learning Management System Usage in Higher Education in Sub-Saharan Africa

    ERIC Educational Resources Information Center

    Mtebe, Joel S.

    2015-01-01

    Learning Management Systems (LMS) have been widely adopted by higher education institutions globally for over a decade. Institutions in sub-Saharan Africa now spend a significant proportion of their limited resources on installing and maintaining these systems. This expenditure continues to increase, raising questions as to whether LMS in these…

  15. Risk management and measuring productivity with POAS--Point of Act System--a medical information system as ERP (Enterprise Resource Planning) for hospital management.

    PubMed

    Akiyama, M

    2007-01-01

    The concept of our system is not only to manage material flows, but also to provide an integrated management resource, a means of correcting errors in medical treatment, and applications to EBM (evidence-based medicine) through the data mining of medical records. Prior to the development of this system, electronic processing systems in hospitals did a poor job of accurately grasping medical practice and medical material flows. With POAS (Point of Act System), hospital managers can solve the so-called, "man, money, material, and information" issues inherent in the costs of healthcare. The POAS system synchronizes with each department system, from finance and accounting, to pharmacy, to imaging, and allows information exchange. We can manage Man (Business Process), Material (Medical Materials and Medicine), Money (Expenditure for purchase and Receipt), and Information (Medical Records) completely by this system. Our analysis has shown that this system has a remarkable investment effect - saving over four million dollars per year - through cost savings in logistics and business process efficiencies. In addition, the quality of care has been improved dramatically while error rates have been reduced - nearly to zero in some cases.

  16. Managing water quality under drought conditions in the Llobregat River Basin.

    PubMed

    Momblanch, Andrea; Paredes-Arquiola, Javier; Munné, Antoni; Manzano, Andreu; Arnau, Javier; Andreu, Joaquín

    2015-01-15

    The primary effects of droughts on river basins include both depleted quantity and quality of the available water resources, which can render water resources useless for human needs and simultaneously damage the environment. Isolated water quality analyses limit the action measures that can be proposed. Thus, an integrated evaluation of water management and quality is warranted. In this study, a methodology consisting of two coordinated models is used to combine aspects of water resource allocation and water quality assessment. Water management addresses water allocation issues by considering the storage, transport and consumption elements. Moreover, the water quality model generates time series of concentrations for several pollutants according to the water quality of the runoff and the demand discharges. These two modules are part of the AQUATOOL decision support system shell for water resource management. This tool facilitates the analysis of the effects of water management and quality alternatives and scenarios on the relevant variables in a river basin. This paper illustrates the development of an integrated model for the Llobregat River Basin. The analysis examines the drought from 2004 to 2008, which is an example of a period when the water system was quantitative and qualitatively stressed. The performed simulations encompass a wide variety of water management and water quality measures; the results provide data for making informed decisions. Moreover, the results demonstrated the importance of combining these measures depending on the evolution of a drought event and the state of the water resources system. Copyright © 2014 Elsevier B.V. All rights reserved.

  17. An Open Software Platform for Sharing Water Resource Models, Code and Data

    NASA Astrophysics Data System (ADS)

    Knox, Stephen; Meier, Philipp; Mohamed, Khaled; Korteling, Brett; Matrosov, Evgenii; Huskova, Ivana; Harou, Julien; Rosenberg, David; Tilmant, Amaury; Medellin-Azuara, Josue; Wicks, Jon

    2016-04-01

    The modelling of managed water resource systems requires new approaches in the face of increasing future uncertainty. Water resources management models, even if applied to diverse problem areas, use common approaches such as representing the problem as a network of nodes and links. We propose a data management software platform, called Hydra, that uses this commonality to allow multiple models using a node-link structure to be managed and run using a single software system. Hydra's user interface allows users to manage network topology and associated data. Hydra feeds this data directly into a model, importing from and exporting to different file formats using Apps. An App connects Hydra to a custom model, a modelling system such as GAMS or MATLAB or to different file formats such as MS Excel, CSV and ESRI Shapefiles. Hydra allows users to manage their data in a single, consistent place. Apps can be used to run domain-specific models and allow users to work with their own required file formats. The Hydra App Store offers a collaborative space where model developers can publish, review and comment on Apps, models and data. Example Apps and open-source libraries are available in a variety of languages (Python, Java and .NET). The App Store can act as a hub for water resource modellers to view and share Apps, models and data easily. This encourages an ecosystem of development using a shared platform, resulting in more model integration and potentially greater unity within resource modelling communities. www.hydraplatform.org www.hydraappstore.com

  18. Multi-layered water resources, management, and uses under the impacts of global changes in a southern coastal metropolis: When will it be already too late? Crossed analysis in Recife, NE Brazil.

    PubMed

    Petelet-Giraud, Emmanuelle; Cary, Lise; Cary, Paul; Bertrand, Guillaume; Giglio-Jacquemot, Armelle; Hirata, Ricardo; Aquilina, Luc; Alves, Lincoln Muniz; Martins, Veridiana; Melo, Ana Maria; Montenegro, Suzana; Chatton, Eliot; Franzen, Melissa; Aurouet, Axel

    2018-03-15

    Coastal water resources are a worldwide key socio-environmental issue considering the increasing concentration of population in these areas. Here, we propose an integrative transdisciplinary approach of water resource, water management and water access in Recife (NE Brazil). The present-day water situation is conceptualized as an imbricated multi-layered system: a multi-layered water resource, managed by a multi-layered governance system and used by a multi-layered social population. This allows identifying processes of quantitative, qualitative, and sanitary conflicts between governance and population strategies regarding water supply, as well as the institutional and individual denials of these conflicts. Based on this model, we anticipate future water-related problematic fates. Concerning the water resource system, the rapid groundwater level decrease due to unsustainable water predatory strategies, and the very low recharge rate have drastically modified the aquifer system functioning, inducing hydraulic connection between shallow groundwater (contaminated and locally salty) and deep ones (mostly fresh, with local inherited salinity), threatening the deep strategic water resource. Concerning the water governance system, the investments to increase the capacity storage of surface water, the water regulation agencies and the public/private partnership should shortly improve the water supply and wastewater issue. Nevertheless, the water situation will remain highly fragile due to the expected water demand increase, the precipitation decrease and the sea-level increase. Concerning the water access system, the population variably perceives these current and further effects and the possible mitigation policies, and develops alternative individual strategies. Authorities, policymakers and water managers will have to implement a well-balanced water governance, taking into account the specificities of the PPP, public and private groundwater users, and with a strong political willingness for a sustainable water management to ensure water supply for all the population. In other words, an anticipatory and integrated vision is necessary to reduce the discrepancies in this complex system. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. 5 CFR 9701.352 - Use of highest previous rate.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Use of highest previous rate. 9701.352 Section 9701.352 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT... HUMAN RESOURCES MANAGEMENT SYSTEM Pay and Pay Administration Pay Administration § 9701.352 Use of...

  20. 5 CFR 9701.518 - Duty to bargain, confer, and consult.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Duty to bargain, confer, and consult. 9701.518 Section 9701.518 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES... SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Labor-Management Relations § 9701.518 Duty to bargain, confer...

Top