Sample records for system technical specifications

  1. 76 FR 69296 - Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite... Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite--Update to... Reactor Systems Engineer, Technical Specifications Branch, Mail Stop: O-7 C2A, Division of Inspection and...

  2. 77 FR 58421 - Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...

  3. 77 FR 16869 - Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...

  4. Student Flow Model SFM-IA: System Documentation. Technical Report 41B. Preliminary Edition.

    ERIC Educational Resources Information Center

    Busby, John C.; Johnson, Richard S.

    Technical specifications, operating procedures, and reference information for the National Center for Higher Education Management Systems' (NCHEMS) Student Flow Model (SFM) computer programs are presented. Included are narrative descriptions of the system and its modules, specific program documentation for each of the modules, system flowcharts,…

  5. Technical Assistance Model for Long-Term Systems Change: Three State Examples

    ERIC Educational Resources Information Center

    Kasprzak, Christina; Hurth, Joicey; Lucas, Anne; Marshall, Jacqueline; Terrell, Adriane; Jones, Elizabeth

    2010-01-01

    The National Early Childhood Technical Assistance Center (NECTAC) Technical Assistance (TA) Model for Long-Term Systems Change (LTSC) is grounded in conceptual frameworks in the literature on systems change and systems thinking. The NECTAC conceptual framework uses a logic model approach to change developed specifically for states' infant and…

  6. 77 FR 4586 - Notice of Opportunity for Public Comment on the Proposed Models for Plant-Specific Adoption of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... Comment on the Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler... on the proposed model safety evaluation (SE) for plant- specific adoption of Technical Specifications... System (ADAMS) under Accession Number ML103360003; the model application is available in ADAMS under...

  7. 48 CFR 227.7102-2 - Rights in technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Rights in technical data... Technical Data 227.7102-2 Rights in technical data. (a) The clause at 252.227-7015, Technical Data—Commercial Items, provides the Government specific license rights in technical data pertaining to commercial...

  8. 76 FR 50276 - STP Nuclear Operating Company, South Texas Project, Units 1 and 2; Notice of Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... revised the application of Risk- Managed Technical Specifications to Technical Specification 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' The purpose of the change was to correct a misapplication of the Configuration Risk Management Program that is currently allowed by the Technical...

  9. 76 FR 19510 - Notice of Availability (NOA) of the Models For Plant-Specific Adoption of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ...-Specific Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF- 422, Revision 2, ``Change In... model safety evaluation (SE) for plant-specific adoption of TSTF Traveler TSTF-422, Revision 2, ``Change..., Revision 2, is available in the Agencywide Documents Access and Management System (ADAMS) under Accession...

  10. NASA Engineering Excellence: A Case Study on Strengthening an Engineering Organization

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert; Wessel, Vernon W.

    2006-01-01

    NASA implemented a system of technical authority following the Columbia Accident Investigation Board (CAE) report calling for independent technical authority to be exercised on the Space Shuttle Program activities via a virtual organization of personnel exercising specific technical authority responsibilities. After the current NASA Administrator reported for duty, and following the first of two planned "Shuttle Return to Flight" missions, the NASA Chief Engineer and the Administrator redirected the Independent Technical Authority to a program of Technical Excellence and Technical Authority exercised within the existing engineering organizations. This paper discusses the original implementation of technical authority and the transition to the new implementation of technical excellence, including specific measures aimed at improving safety of future Shuttle and space exploration flights.

  11. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 4: IPAD system design

    NASA Technical Reports Server (NTRS)

    Goldfarb, W.; Carpenter, L. C.; Redhed, D. D.; Hansen, S. D.; Anderson, L. O.; Kawaguchi, A. S.

    1973-01-01

    The computing system design of IPAD is described and the requirements which form the basis for the system design are discussed. The system is presented in terms of a functional design description and technical design specifications. The functional design specifications give the detailed description of the system design using top-down structured programming methodology. Human behavioral characteristics, which specify the system design at the user interface, security considerations, and standards for system design, implementation, and maintenance are also part of the technical design specifications. Detailed specifications of the two most common computing system types in use by the major aerospace companies which could support the IPAD system design are presented. The report of a study to investigate migration of IPAD software between the two candidate 3rd generation host computing systems and from these systems to a 4th generation system is included.

  12. Technical Specifications of the Nihongo Tutorial System.

    ERIC Educational Resources Information Center

    Leung, Kei Wai; Maciejewski, Anthony A.

    The Nihongo tutorial system is an intelligent tutorial system designed to use a computer to assist scientists and engineers in developing reading competence in technical Japanese. It consists of three applications: the Nihongo Tutor, which provides useful information about an article (translation, syntax, pronunciation) to help understand the text…

  13. 7 CFR 652.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE General Provisions § 652.2 Definitions... public agencies certified by NRCS to provide technical services to a participant. Certification means the... technical service for conservation planning or a specific conservation practice or system; or (2) An entity...

  14. Prefocal station mechanical design concept study for the E-ELT

    NASA Astrophysics Data System (ADS)

    Jolley, Paul; Brunetto, Enzo; Frank, Christoph; Lewis, Steffan; Marchetti, Enrico

    2016-07-01

    The Nasmyth platforms of the E-ELT will contain one Prefocal Station (PFS) each. The main PFS functional requirements are to provide a focal plane to the three Nasmyth focal stations and the Coudé focus, optical sensing supporting telescope low order optimisation and seeing limited image quality, and optical sensing supporting characterising and phasing of M1 and other telescope subsystems. The PFS user requirements are used to derive the PFS technical requirements specification that will form the basis for design, development and production of the system. This specification process includes high-level architectural decisions and technical performance budget allocations. The mechanical design concepts reported here have been developed in order to validate key system specifications and associated technical budgets.

  15. Feasibility study for the Swaziland/Mozambique interconnector. EPC specifications. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the proposed Interconnector between Swaziland and Mozambique. Volume 3 contains EPC Specifications and is divided into the following divisions: (1) Commercial; (2) General Technical Requirements; (3) Transmission Line Technical Requirements; (4) Substation Technical Requirements; (5) Specifications.

  16. Geospatial Analysis | Energy Analysis | NREL

    Science.gov Websites

    products and tools. Image of a triangle divided into sections called Market, Economic, Technical, and Featured Study U.S. Renewable Energy Technical Potentials: A GIS-Based Analysis summarizes the achievable energy generation, or technical potential, of specific renewable energy technologies given system

  17. The National Shipbuilding Research Program. Proceedings of the REAPS Technical Symposium. Paper No. 20: Application of the GIFTS-5 Minibased Graphics System for Ship Design and Analysis

    DTIC Science & Technology

    1979-09-01

    Proceedings of the REAPS Technical Symposium Paper No. 20: Application of the GIFTS -5 Minibased Graphics System for Ship Design and Analysis U.S...The National Shipbuilding Research Program Proceedings of the REAPS Technical Symposium Paper No. 20: Application of the GIFTS -5 Minibased Graphics...MERCHANTABILITY AND/OR FITNESS FOR PURPOSE ARE SPECIFICALLY DISCLAIMED. APPLICATION OF THE GIFTS -5 MINIBASED GRAPHICS SYSTEM FOR SHIP DESIGN AND ANALYSIS Dr

  18. Airborne Laser Remote Sensor for Oil Detection and Classification : Engineering Requirements and Technical Considerations Relevant to a Performance Specification

    DOT National Transportation Integrated Search

    1975-08-01

    This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...

  19. Technical analysis of US Army Weapons Systems and related advanced technologies of military interest. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1991-06-14

    This report summarizes the activities and accomplishments of an US Army technology security project designed to identify and develop effective policy guidelines for militarily critical technologies in specific Army systems and in broad generic technology areas of military interest, Individual systems analyses are documented in separate Weapons Systems Technical Assessments (WSTAs) and the general generic technology areas are evaluated in the Advanced Technology Assessment Reports (ATARs), However, specific details of these assessments are not addressed here, only recommendations regarding aspects of the defined approach, methodology, and format are provided and discussed.

  20. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  1. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  2. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  3. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  4. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  5. System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.

  6. Urban Rail Supporting Technology Program Fiscal Year 1974 Year End Summary

    DOT National Transportation Integrated Search

    1975-03-01

    Major areas include program management, technical support and application engineering, facilities development, test and evaluation, and technology development. Specific technical discussion includes track measurement systems; UMTA facilities developm...

  7. Design Specifications for Adaptive Real-Time Systems

    DTIC Science & Technology

    1991-12-01

    TICfl \\ E CT E Design Specifications for JAN’\\ 1992 Adaptive Real - Time Systems fl Randall W. Lichota U, Alice H. Muntz - December 1991 \\ \\\\/ 0 / r...268-2056 Technical Report CMU/SEI-91-TR-20 ESD-91-TR-20 December 1991 Design Specifications for Adaptive Real - Time Systems Randall W. Lichota Hughes...Design Specifications for Adaptive Real - Time Systems Abstract: The design specification method described in this report treats a software

  8. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  9. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    ERIC Educational Resources Information Center

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  10. The Vocational Education Component of the Rhode Island Educational Management Information System.

    ERIC Educational Resources Information Center

    Galamaga, Donald P.; Bartolomeo, Paul A.

    The document describes the implementation (Phase Two) of the Vocational Educational module--one component of an educational management information system. Phase Two entails the technical effort of final system design, final output specifications, edit specifications, system software selection, computer programing, systems documentation and the…

  11. Instrument and Survey Analysis Technical Report: Program Implementation Survey. Technical Report #1112

    ERIC Educational Resources Information Center

    Alonzo, Julie; Tindal, Gerald

    2011-01-01

    This technical document provides guidance to educators on the creation and interpretation of survey instruments, particularly as they relate to an analysis of program implementation. Illustrative examples are drawn from a survey of educators related to the use of the easyCBM learning system. This document includes specific sections on…

  12. Performance and efficiency of geotextile-supported erosion control measures during simulated rainfall events

    NASA Astrophysics Data System (ADS)

    Obriejetan, Michael; Rauch, Hans Peter; Florineth, Florin

    2013-04-01

    Erosion control systems consisting of technical and biological components are widely accepted and proven to work well if installed properly with regard to site-specific parameters. A wide range of implementation measures for this specific protection purpose is existent and new, in particular technical solutions are constantly introduced into the market. Nevertheless, especially vegetation aspects of erosion control measures are frequently disregarded and should be considered enhanced against the backdrop of the development and realization of adaptation strategies in an altering environment due to climate change associated effects. Technical auxiliaries such as geotextiles typically used for slope protection (nettings, blankets, turf reinforcement mats etc.) address specific features and due to structural and material diversity, differing effects on sediment yield, surface runoff and vegetational development seem evident. Nevertheless there is a knowledge gap concerning the mutual interaction processes between technical and biological components respectively specific comparable data on erosion-reducing effects of technical-biological erosion protection systems are insufficient. In this context, an experimental arrangement was set up to study the correlated influences of geotextiles and vegetation and determine its (combined) effects on surface runoff and soil loss during simulated heavy rainfall events. Sowing vessels serve as testing facilities which are filled with top soil under application of various organic and synthetic geotextiles and by using a reliable drought resistant seed mixture. Regular vegetational monitoring as well as two rainfall simulation runs with four repetitions of each variant were conducted. Therefore a portable rainfall simulator with standardized rainfall intensity of 240 mm h-1 and three minute rainfall duration was used to stress these systems on different stages of plant development at an inclination of 30 degrees. First results show significant differences between the systems referring to sediment yield and runoff amount respectively vegetation development.

  13. NHSA Position Paper: The Design of a Head Start Training and Technical Assistance System.

    ERIC Educational Resources Information Center

    NHSA Journal, 1994

    1994-01-01

    This position paper examines the current Head Start training and technical assistance (TTA) system and proposes specific improvements. These include the creation of regional TTA offices, the use of satellite and interactive communications technology, and a reevaluation of the role of teaching centers, national training contracts, and Head Start…

  14. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  15. A Technical Overview and Description of SOFIA (Stratospheric Observatory for Infrared Astronomy)

    NASA Technical Reports Server (NTRS)

    Kunz, Nans

    2003-01-01

    This paper provides a technical overview of SOFIA, a unique airborne observatory, from an engineering perspective. It will do this by describing several of the systems of this observatory that are common with mountain top ground based observatories but mostly emphasize those more unique features and systems that are required to facilitate world class astronomy from a highly modified Boeing 747-SP flying at Mach 0.84 in the Stratosphere. This paper provides a technical overview of SOFIA by reviewing each of the performance specifications (the level one requirements for development) and describing some of the technical advancements for the telescope as well as the platform required to achieve these performance specifications. The technical advancements involved include mirror technologies, control system features, the telescope suspension system, and the aircraft open port cavity with associated cavity door that opens in flight and tracks the telescope elevation angle. For background this paper will provide a brief programmatic overview of the SOFIA project including the joint project arrangement between the US and Germany (NASA and DLR). Additionally, this paper will describe the up to date status of the development of SOFIA as the Observatory nears the date of the first test flight in the summer of 2004.

  16. The Relationship between Self-Concept and Self-Ratings of Generalizable Skills of Students in Postsecondary Career and Technical Programs

    ERIC Educational Resources Information Center

    Kraebber, Sharon L.; Greenan, James P.

    2012-01-01

    Increasingly, employers desire skills that have traditionally been the purview of high schools and postsecondary career and technical training systems: reading and writing, applied mathematics, and technical and functional skills specific to an occupational area. However, employers also want employees to possess generic skills, employability…

  17. A Technical Analysis Information Fusion Approach for Stock Price Analysis and Modeling

    NASA Astrophysics Data System (ADS)

    Lahmiri, Salim

    In this paper, we address the problem of technical analysis information fusion in improving stock market index-level prediction. We present an approach for analyzing stock market price behavior based on different categories of technical analysis metrics and a multiple predictive system. Each category of technical analysis measures is used to characterize stock market price movements. The presented predictive system is based on an ensemble of neural networks (NN) coupled with particle swarm intelligence for parameter optimization where each single neural network is trained with a specific category of technical analysis measures. The experimental evaluation on three international stock market indices and three individual stocks show that the presented ensemble-based technical indicators fusion system significantly improves forecasting accuracy in comparison with single NN. Also, it outperforms the classical neural network trained with index-level lagged values and NN trained with stationary wavelet transform details and approximation coefficients. As a result, technical information fusion in NN ensemble architecture helps improving prediction accuracy.

  18. MHD program plan, FY 1991

    NASA Astrophysics Data System (ADS)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  19. A comparative analysis of user preference-based and existing knowledge management systems attributes in the aerospace industry

    NASA Astrophysics Data System (ADS)

    Varghese, Nishad G.

    Knowledge management (KM) exists in various forms throughout organizations. Process documentation, training courses, and experience sharing are examples of KM activities performed daily. The goal of KM systems (KMS) is to provide a tool set which serves to standardize the creation, sharing, and acquisition of business critical information. Existing literature provides numerous examples of targeted evaluations of KMS, focusing on specific system attributes. This research serves to bridge the targeted evaluations with an industry-specific, holistic approach. The user preferences of aerospace employees in engineering and engineering-related fields were compared to profiles of existing aerospace KMS based on three attribute categories: technical features, system administration, and user experience. The results indicated there is a statistically significant difference between aerospace user preferences and existing profiles in the user experience attribute category, but no statistically significant difference in the technical features and system administration attribute categories. Additional analysis indicated in-house developed systems exhibit higher technical features and user experience ratings than commercial-off-the-self (COTS) systems.

  20. Electrical resistivity well-logging system with solid-state electronic circuitry

    USGS Publications Warehouse

    Scott, James Henry; Farstad, Arnold J.

    1977-01-01

    An improved 4-channel electrical resistivity well-logging system for use with a passive probe with electrodes arranged in the 'normal' configuration has been designed and fabricated by Westinghouse Electric Corporation to meet technical specifications developed by the U.S. Geological Survey. Salient features of the system include solid-state switching and current regulation in the transmitter circuit to produce a constant-current source square wave, and synchronous solid-state switching and sampling of the potential waveform in the receiver circuit to provide an analog dc voltage proportions to the measured resistivity. Technical specifications and design details are included in this report.

  1. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  2. The NASA/JPL 64-meter-diameter antenna at Goldstone, California: Project report, technical staff, tracking and data acquisition organization

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The significant management and technical aspects of the JPL Project to develop and implement a 64-meter-diameter antenna at the Goldstone Deep Space Communications Complex in California, which was the first of the Advanced Antenna Systems of the National Aeronautics and Space Administration/Jet Propulsion Laboratory Deep Space Network are described. The original need foreseen for a large-diameter antenna to accomplish communication and tracking support of NASA's solar system exploration program is reviewed, and the translation of those needs into the technical specification of an appropriate ground station antenna is described. The antenna project is delineated by phases to show the key technical and managerial skills and the technical facility resources involved. There is a brief engineering description of the antenna and its closely related facilities. Some difficult and interesting engineering problems, then at the state-of-the-art level, which were met in the accomplishment of the Project, are described. The key performance characteristics of the antenna, in relation to the original specifications and the methods of their determination, are stated.

  3. 75 FR 29588 - Notice of Availability of the Models for Plant-Specific Adoption of Technical Specifications Task...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... Documents Access and Management System (ADAMS) under Accession Number ML090510686. The proposed changes... Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC... expedited approval of plant-specific adoption of TSTF- 501, Revision 1. Documents: You can access publicly...

  4. 75 FR 26294 - Notice of Availability of the Models for Plant-Specific Adoption of Technical Specifications Task...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... an errata sheet are available in the Agencywide Documents Access and Management System (ADAMS) under... Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received... facilitate expedited approval of plant-specific adoption of TSTF-493, Revision 4. Documents: You can access...

  5. Technical assistance for law-enforcement communications: Grant summary

    NASA Technical Reports Server (NTRS)

    Reilly, N. B.

    1979-01-01

    A summary overview of project activities and results are presented. The goals and objectives are reviewed and a description of the approaches used to attain them is given. The feedback received from the seminars conducted as part of the project, and results from a questionnaire about the project are included. Significant findings of the project in such areas as radio channel loading, dispatch system design, training and technology transfer are discussed. Several specific problem areas are identified and evaluated. Specific recommendations for future technical assistance efforts are presented along with an inventory of technical-assistance reports generated throughout the project.

  6. Electronic Inventory Systems and Barcode Technology: Impact on Pharmacy Technical Accuracy and Error Liability

    PubMed Central

    Oldland, Alan R.; May, Sondra K.; Barber, Gerard R.; Stolpman, Nancy M.

    2015-01-01

    Purpose: To measure the effects associated with sequential implementation of electronic medication storage and inventory systems and product verification devices on pharmacy technical accuracy and rates of potential medication dispensing errors in an academic medical center. Methods: During four 28-day periods of observation, pharmacists recorded all technical errors identified at the final visual check of pharmaceuticals prior to dispensing. Technical filling errors involving deviations from order-specific selection of product, dosage form, strength, or quantity were documented when dispensing medications using (a) a conventional unit dose (UD) drug distribution system, (b) an electronic storage and inventory system utilizing automated dispensing cabinets (ADCs) within the pharmacy, (c) ADCs combined with barcode (BC) verification, and (d) ADCs and BC verification utilized with changes in product labeling and individualized personnel training in systems application. Results: Using a conventional UD system, the overall incidence of technical error was 0.157% (24/15,271). Following implementation of ADCs, the comparative overall incidence of technical error was 0.135% (10/7,379; P = .841). Following implementation of BC scanning, the comparative overall incidence of technical error was 0.137% (27/19,708; P = .729). Subsequent changes in product labeling and intensified staff training in the use of BC systems was associated with a decrease in the rate of technical error to 0.050% (13/26,200; P = .002). Conclusions: Pharmacy ADCs and BC systems provide complementary effects that improve technical accuracy and reduce the incidence of potential medication dispensing errors if this technology is used with comprehensive personnel training. PMID:25684799

  7. Electronic inventory systems and barcode technology: impact on pharmacy technical accuracy and error liability.

    PubMed

    Oldland, Alan R; Golightly, Larry K; May, Sondra K; Barber, Gerard R; Stolpman, Nancy M

    2015-01-01

    To measure the effects associated with sequential implementation of electronic medication storage and inventory systems and product verification devices on pharmacy technical accuracy and rates of potential medication dispensing errors in an academic medical center. During four 28-day periods of observation, pharmacists recorded all technical errors identified at the final visual check of pharmaceuticals prior to dispensing. Technical filling errors involving deviations from order-specific selection of product, dosage form, strength, or quantity were documented when dispensing medications using (a) a conventional unit dose (UD) drug distribution system, (b) an electronic storage and inventory system utilizing automated dispensing cabinets (ADCs) within the pharmacy, (c) ADCs combined with barcode (BC) verification, and (d) ADCs and BC verification utilized with changes in product labeling and individualized personnel training in systems application. Using a conventional UD system, the overall incidence of technical error was 0.157% (24/15,271). Following implementation of ADCs, the comparative overall incidence of technical error was 0.135% (10/7,379; P = .841). Following implementation of BC scanning, the comparative overall incidence of technical error was 0.137% (27/19,708; P = .729). Subsequent changes in product labeling and intensified staff training in the use of BC systems was associated with a decrease in the rate of technical error to 0.050% (13/26,200; P = .002). Pharmacy ADCs and BC systems provide complementary effects that improve technical accuracy and reduce the incidence of potential medication dispensing errors if this technology is used with comprehensive personnel training.

  8. Computer Program and User Documentation Medical Data Update System

    NASA Technical Reports Server (NTRS)

    Anderson, J.

    1971-01-01

    The update system for the NASA medical data minicomputer storage and retrieval system is described. The discussion includes general and technical specifications, a subroutine list, and programming instructions.

  9. Refurbishment of durban fixed ukzn lidar for atmospheric studies - current status

    NASA Astrophysics Data System (ADS)

    Sivakumar, Venkataraman

    2018-04-01

    The fixed LIDAR system at University of KwaZulu-Natal (UKZN) in Durban was installed in 1999 and operated until 2004. In 2004, the system was relocated and operation closed due to various technical and instrument problems. The restructuring of the LIDAR system was initiated in 2013 and it is now used to measure vertical aerosol profiles in the height range 03-25 km. Here, we describe the present system in detail, including technical specifications and results obtained from a recent LIDAR calibration campaign.

  10. 48 CFR 252.236-7001 - Contract drawings and specifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... specifications. 252.236-7001 Section 252.236-7001 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text... publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by...

  11. 48 CFR 252.236-7001 - Contract drawings and specifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specifications. 252.236-7001 Section 252.236-7001 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text... publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by...

  12. 48 CFR 252.236-7001 - Contract drawings and specifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... specifications. 252.236-7001 Section 252.236-7001 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text... publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by...

  13. 48 CFR 252.236-7001 - Contract drawings and specifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... specifications. 252.236-7001 Section 252.236-7001 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text... publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by...

  14. 48 CFR 252.236-7001 - Contract drawings and specifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... specifications. 252.236-7001 Section 252.236-7001 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text... publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by...

  15. A bibliography on formal methods for system specification, design and validation

    NASA Technical Reports Server (NTRS)

    Meyer, J. F.; Furchtgott, D. G.; Movaghar, A.

    1982-01-01

    Literature on the specification, design, verification, testing, and evaluation of avionics systems was surveyed, providing 655 citations. Journal papers, conference papers, and technical reports are included. Manual and computer-based methods were employed. Keywords used in the online search are listed.

  16. A Development System for Augmented Transition Network Grammars and a Large Grammar for Technical Prose. Technical Report No. 25.

    ERIC Educational Resources Information Center

    Mayer, John; Kieras, David E.

    Using a system based on standard augmented transition network (ATN) parsing approach, this report describes a technique for the rapid development of natural language parsing, called High-Level Grammar Specification Language (HGSL). The first part of the report describes the syntax and semantics of HGSL and the network implementation of each of its…

  17. ASSIST internals reference manual

    NASA Technical Reports Server (NTRS)

    Johnson, Sally C.; Boerschlein, David P.

    1994-01-01

    The Abstract Semi-Markov Specification Interface to the SURE Tool (ASSIST) program was developed at NASA LaRC in order to analyze the reliability of virtually any fault-tolerant system. A user manual was developed to detail its use. Certain technical specifics are of no concern to the end user, yet are of importance to those who must maintain and/or verify the correctness of the tool. This document takes a detailed look into these technical issues.

  18. Measuring Efficiency of Health Systems of the Middle East and North Africa (MENA) Region Using Stochastic Frontier Analysis.

    PubMed

    Hamidi, Samer; Akinci, Fevzi

    2016-06-01

    The main purpose of this study is to measure the technical efficiency of twenty health systems in the Middle East and North Africa (MENA) region to inform evidence-based health policy decisions. In addition, the effects of alternative stochastic frontier model specification on the empirical results are examined. We conducted a stochastic frontier analysis to estimate the country-level technical efficiencies using secondary panel data for 20 MENA countries for the period of 1995-2012 from the World Bank database. We also tested the effect of alternative frontier model specification using three random-effects approaches: a time-invariant model where efficiency effects are assumed to be static with regard to time, and a time-varying efficiency model where efficiency effects have temporal variation, and one model to account for heterogeneity. The average estimated technical inefficiency of health systems in the MENA region was 6.9 % with a range of 5.7-7.9 % across the three models. Among the top performers, Lebanon, Qatar, and Morocco are ranked consistently high according to the three different inefficiency model specifications. On the opposite side, Sudan, Yemen and Djibouti ranked among the worst performers. On average, the two most technically efficient countries were Qatar and Lebanon. We found that the estimated technical efficiency scores vary substantially across alternative parametric models. Based on the findings reported in this study, most MENA countries appear to be operating, on average, with a reasonably high degree of technical efficiency compared with other countries in the region. However, there is evidence to suggest that there are considerable efficiency gains yet to be made by some MENA countries. Additional empirical research is needed to inform future health policies aimed at improving both the efficiency and sustainability of the health systems in the MENA region.

  19. Large scale dynamic systems

    NASA Technical Reports Server (NTRS)

    Doolin, B. F.

    1975-01-01

    Classes of large scale dynamic systems were discussed in the context of modern control theory. Specific examples discussed were in the technical fields of aeronautics, water resources and electric power.

  20. Comparison and selection of off-grid PV systems

    NASA Astrophysics Data System (ADS)

    Izmailov, Andrey Yu.; Lobachevsky, Yakov P.; Shepovalova, Olga V.

    2018-05-01

    This work deals with comparison, evaluation and selection of PV systems of the same type based on their technical parameters either indicated in their technical specifications or calculated ones. Stand-alone and grid backed up photoelectric systems have been considered. General requirements for photoelectric system selection and evaluation have been presented that ensure system operability and required efficiency in operation conditions. Generic principles and definition of photoelectric systems characteristics have been considered. The described method is mainly targeted at PV engineering personnel and private customers purchasing PV systems. It can be also applied in the course of project contests, tenders, etc.

  1. Terrestrial Ecological Unit Inventory technical guide

    Treesearch

    E. Winthers; D. Fallon; J. Haglund; T. DeMeo; G. Nowacki; D. Tart; M. Ferwerda; G. Robertson; A. Gallegos; A. Rorick; D. T. Cleland; W. Robbie

    2005-01-01

    The purpose of this technical guide is to provide specific direction and guidance for conducting Terrestrial Ecological Unit Inventory (TEUI) at the landscape and land-unit scales. TEUI seeks to classify ecological types and map terrestrial ecological units (TEUs) to a consistent standard throughout National Forest System lands. The objectives, policies, and...

  2. A Technical Infrastructure to Integrate Dynamics AX ERP and CRM into University Curriculum

    ERIC Educational Resources Information Center

    Wimmer, Hayden; Hall, Kenneth

    2016-01-01

    Enterprise Resource Planning and Customer Relationship Management are becoming important topics at the university level, and are increasingly receiving course-level attention in the curriculum. In fact, the Information Systems Body of Knowledge specifically identifies Enterprise Architecture as an Information Systems-specific knowledge area. The…

  3. Socio-technical systems and interaction design - 21st century relevance.

    PubMed

    Maguire, Martin

    2014-03-01

    This paper focuses on the relationship between the socio-technical system and the user-technology interface. It looks at specific aspects of the organisational context such as multiple user roles, job change, work processes and workflows, technical infrastructure, and the challenges they present for the interaction designer. The implications of trends such as more mobile and flexible working, the use of social media, and the growth of the virtual organisation, are also considered. The paper also reviews rapidly evolving technologies such as pervasive systems and artificial intelligence, and the skills that workers will need to engage with them. Copyright © 2013 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  4. Department of Defense Access to Intellectual Property for Weapon Systems Sustainment

    DTIC Science & Technology

    2017-05-01

    and acquiring technical data rights …  The cost benefit analysis of including a priced contract option for the future delivery of technical data...entail in terms of cost and benefits , while one of the activities to be finalized is the contract-specific technical data elements.66...Virginia 22311-1882 May 2017 Approved for public release; distribution is unlimited. IDA Paper P-8266 Log: H 17-000030 About This Publication This

  5. Minimally Invasive Implantable Fetal Micropacemaker: Mechanical Testing and Technical Refinements

    PubMed Central

    Zhou, Li; Vest, Adriana N.; Peck, Raymond A.; Sredl, Jonathan P.; Huang, Xuechen; Bar-Cohen, Yaniv; Silka, Michael J.; Pruetz, Jay D.; Chmait, Ramen H.; Loeb, Gerald E.

    2016-01-01

    This paper discusses the technical and safety requirements for cardiac pacing of a human fetus with heart failure and hydrops fetalis secondary to complete heart block. Engineering strategies to meet specific technical requirements were integrated into a systematic design and implementation consisting of a novel fetal micropacemaker, a percutaneous implantation system, and a sterile package that enables device storage and recharging maintenance in a clinical setting. We further analyzed observed problems on myocardial fixation and pacing lead fatigue previously reported in earlier preclinical trials. This paper describes the technical refinements of the implantable fetal micropacemaker to overcome these challenges. The mechanical performance has been extensively tested to verify the improvement of reliability and safety margins of the implantation system. PMID:27021067

  6. Transit safety retrofit package development : architecture and design specifications.

    DOT National Transportation Integrated Search

    2014-05-01

    The Architecture and Design Specifications capture the TRP system architecture and design that fulfills the technical objectives stated in the TRP requirements document. The document begins with an architectural overview that identifies and describes...

  7. Electronic Document Supply Systems.

    ERIC Educational Resources Information Center

    Cawkell, A. E.

    1991-01-01

    Describes electronic document delivery systems used by libraries and document image processing systems used for business purposes. Topics discussed include technical specifications; analogue read-only laser videodiscs; compact discs and CD-ROM; WORM; facsimile; ADONIS (Article Delivery over Network Information System); DOCDEL; and systems at the…

  8. Research progress on disease data bank and DATACON systems

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Developments and specific statistics for this reporting period are presented. The administration, community activities, funding, personnel, marketing and public relations, technical operations, information systems, and technology transfer are discussed.

  9. Computer Education Curriculum. Connecticut Vocational Technical School System. Version 4.

    ERIC Educational Resources Information Center

    Kittell, Linda; Walczak, Joseph

    This computer education curriculum is designed specifically for Connecticut's Regional Vocational Technical Schools' grade 9 computer education course. Each of the 24 lessons is expected to cover at least one class period of 50 minutes. Introductory materials include a listing of course goals and objectives, an outline of sequence and scope via…

  10. Construction Mechanic, Engine Tune-Up II (Diesel), 8-8. Military Curriculum Materials for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This course, adapted from military curriculum materials for vocational and technical education, teaches students to restore diesel engine performance to the manufacturer's specifications through troubleshooting and analyzing diesel engine fuel systems and to make minor and major adjustments to those components that directly affect engine…

  11. Career and Technical Education. 2015 Annual Report

    ERIC Educational Resources Information Center

    Utah System of Higher Education, 2015

    2015-01-01

    Career and Technical Education (CTE) is a key ingredient to meet the needs of Utah's economy. Utah System of Higher Education (USHE) institutions offer CTE programs in all regions of the state, working closely with local business and industry leaders to develop and deliver programs specifically tailored to local workforce development needs. This…

  12. Career and Technical Education. 2016 Annual Report

    ERIC Educational Resources Information Center

    Utah System of Higher Education, 2016

    2016-01-01

    Career and Technical Education (CTE) is a key ingredient to meet the needs of Utah's economy. Utah System of Higher Education (USHE) institutions offer CTE programs in all regions of the state, working closely with local business and industry leaders to develop and deliver programs specifically tailored to local workforce development needs. This…

  13. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... presents a challenge to the integrity of a fission product barrier. (C) Criterion 3. A structure, system... integrity of a fission product barrier. (D) Criterion 4. A structure, system, or component which operating...

  14. Evaluation of ERDA-sponsored coal feed system development

    NASA Technical Reports Server (NTRS)

    Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.

    1977-01-01

    Coal feeders were evaluated based upon criteria such as technical feasibility, performance (i.e. ability to meet process requirements), projected life cycle costs, and projected development cost. An initial set of feeders was selected based on the feeders' cost savings potential compared with baseline lockhopper systems. Additional feeders were considered for selection based on: (1) increasing the probability of successful feeder development; (2) application to specific processes; and (3) technical merit. A coal feeder development program is outlined.

  15. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  16. Technical and economic evaluation of a Brayton-Rankine combined cycle solar-thermal power plant

    NASA Astrophysics Data System (ADS)

    Wright, J. D.; Copeland, R. J.

    1981-05-01

    An assessment of gas-liquid direct-contact heat exchange and of a new storage-coupled system was conducted. Both technical and economic issues are evaluated. Specifically, the storage-coupled combined cycle is compared with a molten salt system. The open Brayton cycle system is used as a topping cycle, and the reject heat powers the molten salt/Rankine system. In this study the molten salt system is left unmodified, the Brayton cycle is integrated on top of a Marietta description of an existing molten salt plant. This compares a nonoptimized combined cycle with an optimized molten salt system.

  17. Integrated Training System for Air Force On-the-Job Training: Specification Development. Final Technical Paper.

    ERIC Educational Resources Information Center

    Carson, Stuart B.; And Others.

    The Air Force conducted this study for two purposes: (1) to define the system of Air Force On-the-Job Training (OJT); and (2) to prepare a set of functional specifications for an integrated, base-level OJT evaluation and management system with linkages to the Major Commands and Air Staff. The study was conducted in four phases. During the first…

  18. 77 FR 27490 - Plant-Specific Adoption, Revision 4 of the Improved Standard Technical Specifications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ...,'' NUREG-1432, ``Standard Technical Specifications, Combustion Engineering Plants,'' NUREG-1433, ``Standard..., ``Standard Technical Specifications, Combustion Engineering Plants'' Revision 4, ADAMS Accession No..., Westinghouse Plants''.. NUREG-1432, ``Standard Technical ML12102A165 ML12102A169 Specifications, Combustion...

  19. Avatar Web-Based Self-Report Survey System Technology for Public Health Research: Technical Outcome Results and Lessons Learned.

    PubMed

    Savel, Craig; Mierzwa, Stan; Gorbach, Pamina M; Souidi, Samir; Lally, Michelle; Zimet, Gregory; Interventions, Aids

    2016-01-01

    This paper reports on a specific Web-based self-report data collection system that was developed for a public health research study in the United States. Our focus is on technical outcome results and lessons learned that may be useful to other projects requiring such a solution. The system was accessible from any device that had a browser that supported HTML5. Report findings include: which hardware devices, Web browsers, and operating systems were used; the rate of survey completion; and key considerations for employing Web-based surveys in a clinical trial setting.

  20. Community College Campus Carry Policy Analysis

    ERIC Educational Resources Information Center

    Alvarado, Joel; Toppin, Sheila

    2017-01-01

    This study provides a policy network analysis on the implications of HB 792 and HB 280 at urban two-year open campuses, with specific attention to Georgia Piedmont Technical College (GPTC), a unit of the Technical College System of Georgia (TCSG). Georgia state legislators passed House Bills 792 and 280, which authorized any person 18 years of age…

  1. Simulation as a Teaching Technology: A Brief History of Its Use in Nursing Education

    ERIC Educational Resources Information Center

    Sanko, Jill S.

    2017-01-01

    Simulation can be used for teaching or practicing both technical skills (insertion of intravenous catheters, or suturing for example) and non-technical skills (communication and teamwork). A combination of full body, high and low technology simulators (mannequins designed to depict humans), body part or body system-specific task trainers (models…

  2. The Crash Outcome Data Evaluation System (CODES)

    DOT National Transportation Integrated Search

    1996-01-01

    The CODES Technical Report presents state-specific results from the Crash : Outcome Data Evaluation System project. These results confirm previous NHTSA : studies and show that safety belts and motorcycle helmets are effective in : reducing fatalitie...

  3. ITS deployment guidance for transit systems : technical edition

    DOT National Transportation Integrated Search

    1997-04-01

    This document provides guidance for the transit community on developing and implementing Intelligent Transportation Systems (ITS) and using the National ITS Architecture. It is written specifically for the transit community and focuses on transit app...

  4. A Telecommunications Industry Primer: A Systems Model.

    ERIC Educational Resources Information Center

    Obermier, Timothy R.; Tuttle, Ronald H.

    2003-01-01

    Describes the Telecommunications Systems Model to help technical educators and students understand the increasingly complex telecommunications infrastructure. Specifically looks at ownership and regulatory status, service providers, transport medium, network protocols, and end-user services. (JOW)

  5. QUARTERLY TECHNICAL PROGRESS REPORT, JULY, AUGUST, SEPTEMBER 1967.

    DTIC Science & Technology

    Contents: Circuit research program; Hardware systems research; Computer system software research; Illinois pattern recognition computer: ILLIAC II... service , use, and program development; IBM 7094/1401 service , use, and program development; Problem specifications; General laboratory information.

  6. Identity Management Systems in Healthcare: The Issue of Patient Identifiers

    NASA Astrophysics Data System (ADS)

    Soenens, Els

    According to a recent recommendation of the European Commission, now is the time for Europe to enhance interoperability in eHealth. Although interoperability of patient identifiers seems promising for matters of patient mobility, patient empowerment and effective access to care, we see that today there is indeed a considerable lack of interoperability in the field of patient identification. Looking from a socio-technical rather than a merely technical point of view, one can understand the fact that the development and implementation of an identity management system in a specific healthcare context is influenced by particular social practices, affected by socio-economical history and the political climate and regulated by specific data protection legislations. Consequently, the process of making patient identification in Europe more interoperable is a development beyond semantic and syntactic levels. In this paper, we gives some examples of today’s patient identifier systems in Europe, discuss the issue of interoperability of (unique) patient identifiers from a socio-technical point of view and try not to ignore the ‘privacy side’ of the story.

  7. Manufacturing Technology Information Analysis Center: Knowledge Is Strength

    NASA Technical Reports Server (NTRS)

    Safar, Michal

    1992-01-01

    The Center's primary function is to facilitate technology transfer within DoD, other government agencies and industry. The DoD has recognized the importance of technology transfer, not only to support specific weapon system manufacture, but to strengthen the industrial base that sustains DoD. MTIAC uses an experienced technical staff of engineers and information specialists to acquire, analyze, and disseminate technical information. Besides ManTech project data, MTIAC collects manufacturing technology from other government agencies, commercial publications, proceedings, and various international sources. MTIAC has various means of disseminating this information. Much of the technical data is on user accessible data bases. The Center researches and writes a number of technical reports each year and publishes a newsletter monthly. Customized research is performed in response to specific inquiries from government and industry. MTIAC serves as a link between Government and Industry to strengthen the manufacturing technology base through the dissemination of advanced manufacturing information.

  8. Technology Area Roadmap for In Space Propulsion Technologies

    NASA Technical Reports Server (NTRS)

    Johnson, Les; Meyer, Mike; Coote, David; Goebel, Dan; Palaszewski, Bryan; White, Sonny

    2010-01-01

    This slide presentation reviews the technology area (TA) roadmap to develop propulsion technologies that will be used to enable further exploration of the solar system, and beyond. It is hoped that development of the technologies within this TA will result in technical solutions that will improve thrust levels, specific impulse, power, specific mass, volume, system mass, system complexity, operational complexity, commonality with other spacecraft systems, manufacturability and durability. Some of the propulsion technologies that are reviewed include: chemical and non-chemical propulsion, and advanced propulsion (i.e., those with a Technology Readiness level of less than 3). Examples of these advanced technologies include: Beamed Energy, Electric Sail, Fusion, High Energy Density Materials, Antimatter, Advanced Fission and Breakthrough propulsion technologies. Timeframes for development of some of these propulsion technologies are reviewed, and top technical challenges are reviewed. This roadmap describes a portfolio of in-space propulsion technologies that can meet future space science and exploration needs.

  9. 75 FR 75705 - Notice of Availability of the Models for Plant-Specific Adoption of Technical Specifications Task...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ..., Rockville, Maryland. NRC's Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available electronically at the NRC's Electronic Reading Room... Specifications End States (BAW- 2441).'' TSTF-431, Revision 3, is available in the Agencywide Documents Access...

  10. Aid in a city at war: the case of Mogadishu, Somalia.

    PubMed

    Grünewald, François

    2012-07-01

    Mogadishu, the capital of Somalia, has been central to life, war, and peace in the country for almost two decades. Its urban characteristics, though, have been put to one side for the most part. In recent years, Mogadishu-related issues have been merged mostly into a global agenda for South and Central Somalia, resulting in the technical and coordination approaches employed in the city largely being reproductions of solutions utilised in refugee camps and rural areas. Unfortunately, urban problems require urban solutions. The aid system is just starting to discover how specific aid in cities at war should be, both from an organisational and a technical standpoint. The enhancement of aid practices in an urban setting implies, among other things, a more strategic approach to the specific spatial characteristics of the city, a more fine-tuned analysis of the technical requirements of the urban service delivery systems, and a better understanding of the role of urban institutions. © 2012 The Author(s). Journal compilation © Overseas Development Institute, 2012.

  11. When "Less is More": The Optimal Design of Language Laboratory Hardware.

    ERIC Educational Resources Information Center

    Kershaw, Gary; Boyd, Gary

    1980-01-01

    The results of a process of designing, building, and "de-bugging" two replacement language laboratory hardware systems at Concordia University (Montreal) are described. Because commercially available systems did not meet specifications within budgetary constraints, the systems were built by the university technical department. The systems replaced…

  12. 48 CFR 252.246-7001 - Warranty of data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...

  13. 48 CFR 252.246-7001 - Warranty of data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...

  14. 48 CFR 252.246-7001 - Warranty of data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...

  15. 48 CFR 252.246-7001 - Warranty of data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...

  16. 48 CFR 252.246-7001 - Warranty of data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...

  17. Instructional Applications of Artificial Intelligence.

    ERIC Educational Resources Information Center

    Halff, Henry M.

    1986-01-01

    Surveys artificial intelligence and the development of computer-based tutors and speculates on the future of artificial intelligence in education. Includes discussion of the definitions of knowledge, expert systems (computer systems that solve tough technical problems), intelligent tutoring systems (ITS), and specific ITSs such as GUIDON, MYCIN,…

  18. Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.

    2004-01-01

    This presentation is planned to be a 10-15 minute "catalytic" focused presentation to be scheduled during one of the working sessions at the TIM. This presentation will focus on Advanced Life Support technologies key to future human Space Exploration as outlined in the Vision, and will include basic requirements, assessment of the state-of-the-art and gaps, and include specific technology metrics. The presentation will be technical in character, lean heavily on data in published ALS documents (such as the Baseline Values and Assumptions Document) but not provide specific technical details or build to information on any technology mentioned (thus the presentation will be benign from an export control and a new technology perspective). The topics presented will be focused on the following elements of Advanced Life Support: air revitalization, water recovery, waste management, thermal control, habitation systems, food systems and bioregenerative life support.

  19. Development of a geographic visualization and communications systems (GVCS) for monitoring remote vehicles

    DOT National Transportation Integrated Search

    1998-03-30

    The purpose of this project is to integrate a variety of geographic information systems : capabilities and telecommunication technologies for potential use in geographic network and : visualization applications. The specific technical goals of the pr...

  20. SAM Technical Review Committee Final Report: Summary and Key Recommendations from the Onsite TRC Meeting Held April 22-23, 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blair, N.; Dobos, S.; Janzou, S.

    2013-08-01

    The System Advisor Model (SAM) is a broad and robust set of models and frameworks for analyzing both system performance and system financing. It does this across a range of technologies dominated by solar technologies including photovoltaics (PV) and concentrated solar power (CSP). The U.S. Department of Energy (DOE) Solar Energy Technology Program requested the SAM development team to review the photovoltaic performance modeling with the development community and specifically, with the independent engineering community. The report summarizes the major effort for this technical review committee (TRC).

  1. Avatar Web-Based Self-Report Survey System Technology for Public Health Research: Technical Outcome Results and Lessons Learned

    PubMed Central

    Savel, Craig; Mierzwa, Stan; Gorbach, Pamina M.; Souidi, Samir; Lally, Michelle; Zimet, Gregory; Interventions, AIDS

    2016-01-01

    This paper reports on a specific Web-based self-report data collection system that was developed for a public health research study in the United States. Our focus is on technical outcome results and lessons learned that may be useful to other projects requiring such a solution. The system was accessible from any device that had a browser that supported HTML5. Report findings include: which hardware devices, Web browsers, and operating systems were used; the rate of survey completion; and key considerations for employing Web-based surveys in a clinical trial setting. PMID:28149445

  2. Real-time earthquake monitoring: Early warning and rapid response

    NASA Technical Reports Server (NTRS)

    1991-01-01

    A panel was established to investigate the subject of real-time earthquake monitoring (RTEM) and suggest recommendations on the feasibility of using a real-time earthquake warning system to mitigate earthquake damage in regions of the United States. The findings of the investigation and the related recommendations are described in this report. A brief review of existing real-time seismic systems is presented with particular emphasis given to the current California seismic networks. Specific applications of a real-time monitoring system are discussed along with issues related to system deployment and technical feasibility. In addition, several non-technical considerations are addressed including cost-benefit analysis, public perceptions, safety, and liability.

  3. Education, Technology, and Media: A Peak into My Summer Internship at NASA Glenn Research Center in Cleveland, Ohio

    NASA Technical Reports Server (NTRS)

    Moon, James

    2004-01-01

    My name is James Moon and I am a senor at Tennessee State University where my major is Aeronautical and Industrial Technology with a concentration in industrial electronics. I am currently serving my internship in the Engineering and Technical Services Directorate at the Glenn Research Center (GRC). The Engineering and Technical Service Directorate provides the services and infrastructure for the Glenn Research Center to take research concepts to reality. They provide a full range of integrated services including engineering, advanced prototyping and testing, facility management, and information technology for NASA, industry, and academia. Engineering and Technical Services contains the core knowledge in Information Technology (IT). This includes data systems and analysis, inter and intranet based systems design and data security. Including the design and development of embedded real-time sohare applications for flight and supporting ground systems, Engineering and Technical Services provide a wide range of IT services and products specific to the Glenn Research Center research and engineering community.

  4. 77 FR 1514 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... Technical Specification (TS) 3.4.5, ``RCS Leakage Detection Instrumentation,'' consistent with the NRC... monitoring system are the only operable reactor coolant leakage detection monitoring systems. The modified... Coolant System] Leakage Instrumentation,'' Revision 3. The availability of this TS improvement was...

  5. Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device.

    PubMed

    Picone, Rico A R; Davis, Solomon; Devine, Cameron; Garbini, Joseph L; Sidles, John A

    2017-04-01

    We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.

  6. Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device

    NASA Astrophysics Data System (ADS)

    Picone, Rico A. R.; Davis, Solomon; Devine, Cameron; Garbini, Joseph L.; Sidles, John A.

    2017-04-01

    We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.

  7. 78 FR 32476 - Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-426...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... Standard Technical Specification (STS): NUREG-1432, ``Standard Technical Specifications Combustion..., Washington, DC 20555- 0001. SUPPLEMENTARY INFORMATION: TSTF-426, Revision 5, is applicable to all Combustion...

  8. Parametric Cost Study of AC-DC Wayside Power Systems

    DOT National Transportation Integrated Search

    1975-09-01

    The wayside power system provides all the power requirements of an electric vehicle operating on a fixed guideway. For a given set of specifications there are numerous wayside power supply configurations which will be satisfactory from a technical st...

  9. Space transfer concepts and analysis for exploration missions

    NASA Technical Reports Server (NTRS)

    Woodcock, Gordon R.

    1992-01-01

    The current technical effort is part of the third phase of a broad-scoped and systematic study of space transfer concepts for human lunar and Mars missions. The study addressed the technical issues relating to the First Lunar Outpost (FLO) habitation vehicle with emphasis on the structure, power, life support system, and radiation environment for a baseline habitat with specific alternatives for the baseline.

  10. International Conference on Harmonisation; Electronic Transmission of Postmarket Individual Case Safety Reports for Drugs and Biologics, Excluding Vaccines; Availability of Food and Drug Administration Regional Implementation Specifications for ICH E2B(R3) Reporting to the Food and Drug Administration Adverse Event Reporting System. Notice of Availability.

    PubMed

    2016-06-23

    The Food and Drug Administration (FDA) is announcing the availability of its FDA Adverse Event Reporting System (FAERS) Regional Implementation Specifications for the International Conference on Harmonisation (ICH) E2B(R3) Specification. FDA is making this technical specifications document available to assist interested parties in electronically submitting individual case safety reports (ICSRs) (and ICSR attachments) to the Center for Drug Evaluation and Research (CDER) and the Center for Biologics Evaluation and Research (CBER). This document, entitled "FDA Regional Implementation Specifications for ICH E2B(R3) Implementation: Postmarket Submission of Individual Case Safety Reports (ICSRs) for Drugs and Biologics, Excluding Vaccines" supplements the "E2B(R3) Electronic Transmission of Individual Case Safety Reports (ICSRs) Implementation Guide--Data Elements and Message Specification" final guidance for industry and describes FDA's technical approach for receiving ICSRs, for incorporating regionally controlled terminology, and for adding region-specific data elements when reporting to FAERS.

  11. 76 FR 73727 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... Detection Instrumentation,'' to define a new time limit for restoring inoperable RCS leakage detection... Specifications Section 3.4.15 regarding reactor coolant leakage detection instrumentation to be consistent with... amendments revised the Technical Specifications (TSs) ``RCS [reactor coolant system] Leakage Detection...

  12. Edwin I. Hatch nuclear plant implementation of improved technical specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahler, S.R.; Pendry, D.

    1994-12-31

    Edwin I. Hatch nuclear plant consists of two General Electric boiling water reactor/4 units, with a common control room and a common refueling floor. In March 1993, Hatch began conversion of both units` technical specifications utilizing NUREG 1433. The technical specifications amendment request was submitted February 25, 1994. Issuance is scheduled for October 21, 1994, with implementation on March 15, 1994. The current unit-1 technical specifications are in the {open_quotes}custom{close_quotes} format, and the unit-2 technical specifications are in the old standard format. Hatch previously relocated the fire protection and radiological technical specifications requirements. The Hatch conversion will provide consistency betweenmore » the two units, to the extent practicable.« less

  13. 78 FR 25310 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    .../diminished. There are no design changes associated with this TS amendment. The DC power system/batteries will... changes restructure the Technical Specifications (TS) for the direct current (DC) electrical power system... battery and battery charger operability requirements. The DC electrical power system, including associated...

  14. Commercialization of parabolic dish systems

    NASA Technical Reports Server (NTRS)

    Washom, B.

    1982-01-01

    The impact of recent federal tax and regulatory legislation on the commercialization of parabolic solar reflector technology is assessed. Specific areas in need of technical or economic improvement are noted.

  15. Commercialization of parabolic dish systems

    NASA Astrophysics Data System (ADS)

    Washom, B.

    1982-07-01

    The impact of recent federal tax and regulatory legislation on the commercialization of parabolic solar reflector technology is assessed. Specific areas in need of technical or economic improvement are noted.

  16. A computer-based specification methodology

    NASA Technical Reports Server (NTRS)

    Munck, Robert G.

    1986-01-01

    Standard practices for creating and using system specifications are inadequate for large, advanced-technology systems. A need exists to break away from paper documents in favor of documents that are stored in computers and which are read and otherwise used with the help of computers. An SADT-based system, running on the proposed Space Station data management network, could be a powerful tool for doing much of the required technical work of the Station, including creating and operating the network itself.

  17. Measuring and explaining multi-directional inefficiency in the Malaysian dairy industry.

    PubMed

    Mohd Suhaimi, Nurul Aisyah Binti; de Mey, Yann; Oude Lansink, Alfons

    2017-01-01

    The purpose of this paper is to measure the technical inefficiency of dairy farms and subsequently investigate the factors affecting technical inefficiency in the Malaysian dairy industry. This study uses multi-directional efficiency analysis to measure the technical inefficiency scores on a sample of 200 farm observations and single-bootstrap truncated regression model to define factors affecting technical inefficiency. Managerial and program inefficiency scores are presented for intensive and semi-intensive production systems. The results reveal marked differences in the inefficiency scores across inputs and between production systems. Intensive systems generally have lowest managerial and program inefficiency scores in the Malaysian dairy farming sector. Policy makers could use this information to advise dairy farmers to convert their farming system to the intensive system. The results suggest that the Malaysian Government should redefine its policy for providing farm finance and should target young farmers when designing training and extension programs in order to improve the performance of the dairy sector. The existing literature on Southeast Asian dairy farming has neither focused on investigating input-specific efficiency nor on comparing managerial and program efficiency. This paper aims to fill this gap.

  18. Predictive Software Cost Model Study. Volume I. Final Technical Report.

    DTIC Science & Technology

    1980-06-01

    development phase to identify computer resources necessary to support computer programs after transfer of program manangement responsibility and system... classical model development with refinements specifically applicable to avionics systems. The refinements are the result of the Phase I literature search

  19. QUARTERLY TECHNICAL PROGRESS REPORT, JULY, AUGUST, SEPTEMBER 1966.

    DTIC Science & Technology

    Contents: Circuit research program; Hardware systems research; Software systems research program; Numerical methods, computer arithmetic and...artificial languages; Library automation; Illiac II service , use, and program development; IBM service , use, and program development; Problem specifications; Switching theory and logical design; General laboratory information.

  20. MultiLIS: A Description of the System Design and Operational Features.

    ERIC Educational Resources Information Center

    Kelly, Glen J.; And Others

    1988-01-01

    Describes development, hardware requirements, and features of the MultiLIS integrated library software package. A system profile provides pricing information, operational characteristics, and technical specifications. Sidebars discuss MultiLIS integration structure, incremental architecture, and NCR Tower Computers. (4 references) (MES)

  1. Soil Gas Sampling

    EPA Pesticide Factsheets

    Field Branches Quality System and Technical Procedures: This document describes general and specific procedures, methods and considerations to be used and observed when collecting soil gas samples for field screening or laboratory analysis.

  2. Space Research and Technology Program: Program and specific objectives, document approval

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A detailed view of the Space Research and Technology program work breakdown structure is provided down to the specific objective level. Goals or objectives at each of these levels are set forth. The specific objective narratives are structured into several parts. First, a short paragraph statement of the specific objective is given. This is followed by a list of subobjectives. A list of targets is then provided for those areas of the specific objective that are amenable to a quantitative description of technical accomplishment and schedule. Fluid and thermal physics, materials and structures, computer science and electronics, space energy conversion, multidisciplinary research, controls and human factors, chemical propulsion, spacecraft systems, transportation systems, platform systems, and spacecraft systems technology comprise the principal research programs.

  3. NASA's UAS NAS Access Project

    NASA Technical Reports Server (NTRS)

    Johnson, Charles W.

    2011-01-01

    The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.

  4. Second NASA Technical Interchange Meeting (TIM): Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box (TTB)

    NASA Technical Reports Server (NTRS)

    ONeil, D. A.; Mankins, J. C.; Christensen, C. B.; Gresham, E. C.

    2005-01-01

    The Advanced Technology Lifecycle Analysis System (ATLAS), a spreadsheet analysis tool suite, applies parametric equations for sizing and lifecycle cost estimation. Performance, operation, and programmatic data used by the equations come from a Technology Tool Box (TTB) database. In this second TTB Technical Interchange Meeting (TIM), technologists, system model developers, and architecture analysts discussed methods for modeling technology decisions in spreadsheet models, identified specific technology parameters, and defined detailed development requirements. This Conference Publication captures the consensus of the discussions and provides narrative explanations of the tool suite, the database, and applications of ATLAS within NASA s changing environment.

  5. [The study of establishment of the " Chinese provincial Blindness prevention technical guidance group performance evaluation system"].

    PubMed

    Lu, L N; He, X G; Zhu, J F; Xu, X; Zhang, R; Hu, X; Zou, H D

    2016-11-11

    Objective: To establish an assessment system, including indexes and scoring methods, that can be used for performance evaluation of the provincial blindness prevention technical guidance group properly and effectively . Methods: The indexes and scoring methods were set based on the core content of The " National Plan of Prevention and Treatment of Blindness (2012-2015)" , the specific requirement and target of the World Health Organization (WHO) "For the General Eye Health: Global plan of Action (2014-2019)" , and the current situation of the China's provinces and autonomous regions. These indexes should be of effectiveness, feasibility, comparability, guidance and advancing. Formed by a literature review of candidate indicators, the framework of the system is built by qualitative assessment. With the Delphi method, the system was further revised and improved. Empirical pilot study was then used to prove the feasibility, followed by the final qualitative analysis that establish the " Chinese provincial Blindness prevention technical guidance group performance evaluation system" . Results: Through the literature review and qualitative assessment, a six dimensional system framework was built, including 6 first-level indicators, 16 second-level indicators, and 29 third-level indicators through Delphi method evaluation. With the variation coefficient method, the coeffiences of the first-level index weight were calculated as: Organization and management 0.15, Development and implementation of blindness prevention plans 0.15, Implementation of blindness prevention projects 0.14, Training 0.17, Health education 0.18, and Cooperation and exchanges 0.21. The specific scoring method for this system is confirmed as: data and files check, field interview, and record interview, sampling investigation. Empirical pilot study was conducted in the Jilin, Guizhou and Gansu provinces, and the self-assessment results from local experts were consistent with the scores from the systems. Conclusion: This system established is appropriate at current time, and it can effectively evaluate the performance of the Chinese provincial Blindness prevention technical guidance group. (Chin J Ophthalmol, 2016, 52:814-824) .

  6. 45 CFR 1614.3 - Range of activities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... legal research systems or other resources. (c) The specific methods to be undertaken by a recipient to... bono basis through the provision of community legal education, training, technical assistance, research..., computer-assisted legal research systems or other resources; and (2) Support provided by the recipient in...

  7. Work management plan for data systems and analysis directorate

    NASA Technical Reports Server (NTRS)

    Nichols, L. R.

    1979-01-01

    A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

  8. Closed-ecology life support systems /CELSS/ for long-duration, manned missions

    NASA Technical Reports Server (NTRS)

    Modell, M.; Spurlock, J. M.

    1979-01-01

    Studies were conducted to scope the principal areas of technology that can contribute to the development of closed-ecology life support systems (CELSS). Such systems may be required for future space activities, such as space stations, manufacturing facilities, or colonies. A major feature of CELSS is the regeneration of food from carbon in waste materials. Several processes, using biological and/or physico-chemical components, have been postulated for closing the recycle loop. At the present time, limits of available technical information preclude the specification of an optimum scheme. Nevertheless, the most significant technical requirements can be determined by way of an iterative procedure of formulating, evaluating and comparing various closed-system scenario. The functions features and applications of this systems engineering procedure are discussed.

  9. Scaffold Translation: Barriers Between Concept and Clinic

    PubMed Central

    Murphy, William L.

    2011-01-01

    Translation of scaffold-based bone tissue engineering (BTE) therapies to clinical use remains, bluntly, a failure. This dearth of translated tissue engineering therapies (including scaffolds) remains despite 25 years of research, research funding totaling hundreds of millions of dollars, over 12,000 papers on BTE and over 2000 papers on BTE scaffolds alone in the past 10 years (PubMed search). Enabling scaffold translation requires first an understanding of the challenges, and second, addressing the complete range of these challenges. There are the obvious technical challenges of designing, manufacturing, and functionalizing scaffolds to fill the Form, Fixation, Function, and Formation needs of bone defect repair. However, these technical solutions should be targeted to specific clinical indications (e.g., mandibular defects, spine fusion, long bone defects, etc.). Further, technical solutions should also address business challenges, including the need to obtain regulatory approval, meet specific market needs, and obtain private investment to develop products, again for specific clinical indications. Finally, these business and technical challenges present a much different model than the typical research paradigm, presenting the field with philosophical challenges in terms of publishing and funding priorities that should be addressed as well. In this article, we review in detail the technical, business, and philosophical barriers of translating scaffolds from Concept to Clinic. We argue that envisioning and engineering scaffolds as modular systems with a sliding scale of complexity offers the best path to addressing these translational challenges. PMID:21902613

  10. 77 FR 60146 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using... supported Technical Specification (TS) systems inoperable when the associated snubber(s) cannot perform its... allowed before declaring a TS supported system inoperable and taking its Conditions and Required Actions...

  11. Network Performance and Coordination in the Health, Education, Telecommunications System. Satellite Technology Demonstration, Technical Report No. 0422.

    ERIC Educational Resources Information Center

    Braunstein, Jean; Janky, James M.

    This paper describes the network coordination for the Health, Education, Telecommunications (HET) system. Specifically, it discusses HET network performance as a function of a specially-developed coordination system which was designed to link terrestrial equipment to satellite operations centers. Because all procedures and equipment developed for…

  12. 32 CFR Appendix F to Part 505 - Example of a System of Records Notice

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... series number related to the subject matter, and the final letter group shows the system manager's... use office symbols. (e) Categories of Individuals: Describe the individuals covered by the system. Use non-technical, specific categories of individuals about whom the Department of Army keeps records. Do...

  13. 32 CFR Appendix F to Part 505 - Example of a System of Records Notice

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... series number related to the subject matter, and the final letter group shows the system manager's... use office symbols. (e) Categories of Individuals: Describe the individuals covered by the system. Use non-technical, specific categories of individuals about whom the Department of Army keeps records. Do...

  14. 76 FR 16785 - Meeting for Software Developers on the Technical Specifications for Common Formats for Patient...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Software Developers on the Technical Specifications for Common Formats for Patient Safety Data Collection... designed as an interactive forum where PSOs and software developers can provide input on these technical... updated event descriptions, forms, and technical specifications for software developers. As an update to...

  15. The GOAL-to-HAL/S translator specification. [for space shuttle

    NASA Technical Reports Server (NTRS)

    Stanten, S. F.; Flanders, J. H.

    1973-01-01

    The specification sets forth a technical framework within which to deal with the transfer of specific GOAL features to HAL/S. Key technical features of the translator are described which communicate with the data bank, handle repeat statements, and deal with software interrupts. GOAL programs, databank information, and GOAL system subroutines are integrated into one GOAL in HAL/S. This output is fully compatible HAL/S source ready for insertion into the HAL/S compiler. The Translator uses a PASS1 to establish all the global data needed for the HAL/S output program. Individual GOAL statements are translated in PASS2. The specification document makes extensive use of flowcharts to specify exactly how each variation of each GOAL statement is to be translated. The specification also deals with definitions and assumptions, executive support structure and implementation. An appendix, entitled GOAL-to-HAL Mapping, provides examples of translated GOAL statements.

  16. Certification Testing Approach for Propulsion System Design

    NASA Technical Reports Server (NTRS)

    Rodriguez, Henry; Popp, Chris

    2005-01-01

    The Certification of Propulsion Systems is costly and complex which involves development and qualification testing. The desire of the certification process is to assure all requirements can be demonstrated to be compliant. The purpose of this paper is to address the technical design concerns of certifying a system for flight. The authors of this paper have experience the lessons learned from supporting the Shuttle Program for Main Propulsion and On Orbit Propulsions Systems. They have collaborated design concerns for certifying propulsion systems. Presented are Pressurization, Tankage, Feed System and Combustion Instability concerns. Propulsion System Engineers are challenged with the dilemma for testing new systems to specific levels to reduce risk yet maintain budgetary targets. A methodical approach is presented to define the types of test suitable to address the technical issues for qualifying systems for retiring the risk levels.

  17. Phase 1 of the First Solar Small Power System Experiment (experimental System No. 1). Volume 1: Technical Studies for Solar Point-focusing, Distributed Collector System, with Energy Conversion at the Collector, Category C

    NASA Technical Reports Server (NTRS)

    Clark, T. B. (Editor)

    1979-01-01

    The technical and economic feasibility of a solar electric power plant for a small community is evaluated and specific system designs for development and demonstration are selected. All systems investigated are defined as point focusing, distributed receiver concepts, with energy conversion at the collector. The preferred system is comprised of multiple parabolic dish concentrators employing Stirling cycle engines for power conversion. The engine, AC generator, cavity receiver, and integral sodium pool boiler/heat transport system are combined in a single package and mounted at the focus of each concentrator. The output of each concentrator is collected by a conventional electrical distribution system which permits grid-connected or stand-alone operation, depending on the storage system selected.

  18. Knowledge-based graphical interfaces for presenting technical information

    NASA Technical Reports Server (NTRS)

    Feiner, Steven

    1988-01-01

    Designing effective presentations of technical information is extremely difficult and time-consuming. Moreover, the combination of increasing task complexity and declining job skills makes the need for high-quality technical presentations especially urgent. We believe that this need can ultimately be met through the development of knowledge-based graphical interfaces that can design and present technical information. Since much material is most naturally communicated through pictures, our work has stressed the importance of well-designed graphics, concentrating on generating pictures and laying out displays containing them. We describe APEX, a testbed picture generation system that creates sequences of pictures that depict the performance of simple actions in a world of 3D objects. Our system supports rules for determining automatically the objects to be shown in a picture, the style and level of detail with which they should be rendered, the method by which the action itself should be indicated, and the picture's camera specification. We then describe work on GRIDS, an experimental display layout system that addresses some of the problems in designing displays containing these pictures, determining the position and size of the material to be presented.

  19. Product specification documentation standard and Data Item Descriptions (DID). Volume of the information system life-cycle and documentation standards, volume 3

    NASA Technical Reports Server (NTRS)

    Callender, E. David; Steinbacher, Jody

    1989-01-01

    This is the third of five volumes on Information System Life-Cycle and Documentation Standards which present a well organized, easily used standard for providing technical information needed for developing information systems, components, and related processes. This volume states the Software Management and Assurance Program documentation standard for a product specification document and for data item descriptions. The framework can be applied to any NASA information system, software, hardware, operational procedures components, and related processes.

  20. Comprehensive Areal Model of Earthquake-Induced Landslides: Technical Specification and User Guide

    USGS Publications Warehouse

    Miles, Scott B.; Keefer, David K.

    2007-01-01

    This report describes the complete design of a comprehensive areal model of earthquakeinduced landslides (CAMEL). This report presents the design process, technical specification of CAMEL. It also provides a guide to using the CAMEL source code and template ESRI ArcGIS map document file for applying CAMEL, both of which can be obtained by contacting the authors. CAMEL is a regional-scale model of earthquake-induced landslide hazard developed using fuzzy logic systems. CAMEL currently estimates areal landslide concentration (number of landslides per square kilometer) of six aggregated types of earthquake-induced landslides - three types each for rock and soil.

  1. 77 FR 27814 - Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... NUCLEAR REGULATORY COMMISSION [Project No. 753; NRC-2012-0019] Model Safety Evaluation for Plant... Regulatory Commission (NRC) is announcing the availability of the model safety evaluation (SE) for plant... the Improved Standard Technical Specification (ISTS), NUREG-1431, ``Standard Technical Specifications...

  2. 45 CFR 162.920 - Availability of implementation specifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... implementation specifications and the Technical Reports Type 3 described in subparts I through S of this part... implementation specifications, which include the Technical Reports Type 3 described in this section, for... part 51. The implementation specifications and Technical Reports Type 3 described in this section are...

  3. Hyperspectral Imaging and Obstacle Detection for Robotics Navigation

    DTIC Science & Technology

    2005-09-01

    anatomy and diffraction process. 17 3.3 Technical Specifications of the System A. Brimrose AOTF Video Adaptor Specifications: Material TeO2 Active...sampled from glass case on person 2’s belt 530 pixels 20 pick-up white sampled from body panels of pick-up 600 pixels 21 pick-up blue sampled from

  4. Relationship between Procedural Tactical Knowledge and Specific Motor Skills in Young Soccer Players

    PubMed Central

    Aquino, Rodrigo; Marques, Renato Francisco R.; Petiot, Grégory Hallé; Gonçalves, Luiz Guilherme C.; Moraes, Camila; Santiago, Paulo Roberto P.; Puggina, Enrico Fuini

    2016-01-01

    The purpose of this study was to investigate the association between offensive tactical knowledge and the soccer-specific motor skills performance. Fifteen participants were submitted to two evaluation tests, one to assess their technical and tactical analysis. The motor skills performance was measured through four tests of technical soccer skills: ball control, shooting, passing and dribbling. The tactical performance was based on a tactical assessment system called FUT-SAT (Analyses of Procedural Tactical Knowledge in Soccer). Afterwards, technical and tactical evaluation scores were ranked with and without the use of the cluster method. A positive, weak correlation was perceived in both analyses (rho = 0.39, not significant p = 0.14 (with cluster analysis); and rho = 0.35; not significant p = 0.20 (without cluster analysis)). We can conclude that there was a weak association between the technical and the offensive tactical knowledge. This shows the need to reflect on the use of such tests to assess technical skills in team sports since they do not take into account the variability and unpredictability of game actions and disregard the inherent needs to assess such skill performance in the game. PMID:29910300

  5. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices.

    PubMed

    Kraft, Marc

    2008-09-03

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority.

  6. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices

    PubMed Central

    Kraft, Marc

    2008-01-01

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority. PMID:20204095

  7. Systematic Approach to the Development, Evolution, and Effectiveness of Integrated Product Development Teams (IPDTs)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Margie Jeffs; R. Douglas Hamelin

    Integrated Product Development Teams (IPDT) are a key component of any systems engineering (SE) application, but since they are formed primarily from technical considerations, many IPDTs are far less productive than they otherwise could be. By recognizing specific personality types and skill sets, a random group of 'technical' individuals can be structured to become a highly effective team capable of delivering much more than the sum of its members.

  8. AgRISTARS. Preliminary technical results review of FY81 experiments, volume 2: Fiscal year 1981/1982 "corn and soybeans pilot" experiment

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The performance of the technology exhibited significant proportion estimation errors, specifically, high mean error in both corn and soybeans area estimation. The data systems, technical approaches, and data assessment of the pilot experiment were reviewed. Results of proportion estimations procedure performance evaluations, and sensitivity evaluations are presented. The role of the pilot experiment in foreign technology development is discussed.

  9. Solar thermal technology evaluation, fiscal year 1982. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The technology base of solar thermal energy is investigated. The materials, components, subsystems, and processes capable of meeting specific energy cost targets are emphasized, as are system efficiency and reliability.

  10. The French Space Operation Act: Technical Regulations

    NASA Astrophysics Data System (ADS)

    Trinchero, J. P.; Lazare, B.

    2010-09-01

    The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.

  11. Space station systems analysis study. Part 2, Volume 2. [technical report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Specific system options are defined and identified for a cost effective space station capable of orderly growth with regard to both function and orbit location. Selected program options are analyzed and configuration concepts are developed to meet objectives for the satellite power system, earth servicing, space processing, and supporting activities. Transportation systems are analyzed for both LEO and GEO orbits.

  12. MSFC Skylab Orbital Workshop, volume 1. [systems analysis and equipment specifications for orbital laboratory

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The technical aspects of the Skylab-Orbital Workshop are discussed. Original concepts, goals, design philosophy, hardware, and testing are reported. The final flight configuration, overall test program, and mission performance are analyzed. The systems which are examined are: (1) the structural system, (2) the meteoroid shield systems, and (3) the environmental/thermal control subsystem.

  13. Innovative Concepts and Technology for Railroad-Highway Grade Crossing Motorist Warning Systems : Volume 1. Overview and Concept Generation and Analysis

    DOT National Transportation Integrated Search

    1977-09-01

    The document includes a general review of innovative conceptual and technical approaches to train-activated motorist warning systems for use at railroad-highway grade crossings, and also contains a specific report describing a study directed toward t...

  14. 75 FR 39991 - Notice of Availability of the Proposed Models For Plant-Specific Adoption of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... Agencywide Documents Access and Management System (ADAMS) under Accession Number ML080510164. The proposed..., Maryland. NRC's Agencywide Documents Access and Management System (ADAMS): Publicly available documents..., Revision 3. You can access publicly available documents related to this notice using the following methods...

  15. 10 CFR 50.36 - Technical specifications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or component that is part of the primary success path and which functions or actuates to mitigate a... significant safety functions. Where a limiting safety system setting is specified for a variable on which a... the automatic safety system does not function as required, the licensee shall take appropriate action...

  16. Designing a system for patients controlling providers' access to their electronic health records: organizational and technical challenges.

    PubMed

    Leventhal, Jeremy C; Cummins, Jonathan A; Schwartz, Peter H; Martin, Douglas K; Tierney, William M

    2015-01-01

    Electronic health records (EHRs) are proliferating, and financial incentives encourage their use. Applying Fair Information Practice principles to EHRs necessitates balancing patients' rights to control their personal information with providers' data needs to deliver safe, high-quality care. We describe the technical and organizational challenges faced in capturing patients' preferences for patient-controlled EHR access and applying those preferences to an existing EHR. We established an online system for capturing patients' preferences for who could view their EHRs (listing all participating clinic providers individually and categorically-physicians, nurses, other staff) and what data to redact (none, all, or by specific categories of sensitive data or patient age). We then modified existing data-viewing software serving a state-wide health information exchange and a large urban health system and its primary care clinics to allow patients' preferences to guide data displays to providers. Patients could allow or restrict data displays to all clinicians and staff in a demonstration primary care clinic, categories of providers (physicians, nurses, others), or individual providers. They could also restrict access to all EHR data or any or all of five categories of sensitive data (mental and reproductive health, sexually transmitted diseases, HIV/AIDS, and substance abuse) and for specific patient ages. The EHR viewer displayed data via reports, data flowsheets, and coded and free text data displayed by Google-like searches. Unless patients recorded restrictions, by default all requested data were displayed to all providers. Data patients wanted restricted were not displayed, with no indication they were redacted. Technical barriers prevented redacting restricted information in free textnotes. The program allowed providers to hit a "Break the Glass" button to override patients' restrictions, recording the date, time, and next screen viewed. Establishing patient-control over EHR data displays was complex and required ethical, clinical, database, and programming expertise and difficult choices to overcome technical and health system constraints. Assessing patients' preferences for access to their EHRs and applying them in clinical practice requires wide-ranging technical, clinical, and bioethical expertise, to make tough choices to overcome significant technical and organization challenges.

  17. Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The technical and economic feasibility of Satellite Solar Power Systems was studied with emphasis on the analysis and definition of an integrated strawman configuration concept, from which credible cost data could be estimated. Specifically, system concepts for each of the major subprogram areas were formulated, analyzed, and iterated to the degree necessary for establishing an overall, workable baseline system design. Cost data were estimated for the baseline and used to conduct economic analyses. The baseline concept selected was a 5-GW crystal silicon truss-type photovoltaic configuration, which represented the most mature concept available. The overall results and major findings, and the results of technical analyses performed during the final phase of the study efforts are reported.

  18. Crime Prevention in Schools: Specification, Installation, and Maintenance of Intruder Alarm Systems. Building Bulletin 69.

    ERIC Educational Resources Information Center

    Haworth-Roberts, A., Ed.

    Greater use of expensive equipment by schools has also increased the potential for vandalism and theft, giving an increased role to intruder alarm systems. This document provides guidance on the management and technical aspects of forming policies for installing and operating intruder alarm systems in educational buildings. Also provided are…

  19. NASA Docking System (NDS) Users Guide: International Space Station Program. Type 4

    NASA Technical Reports Server (NTRS)

    Tabakman, Alexander

    2010-01-01

    The NASA Docking System (NDS) Users Guide provides an overview of the basic information needed to integrate the NDS onto a Host Vehicle (HV). This Users Guide is intended to provide a vehicle developer with a fundamental understanding of the NDS technical and operations information to support their program and engineering integration planning. The Users Guide identifies the NDS Specification, Interface Definition or Requirement Documents that contain the complete technical details and requirements that a vehicle developer must use to design, develop and verify their systems will interface with NDS. This Guide is an initial reference and must not be used as a design document. In the event of conflict between this Users Guide and other applicable interface definition or requirements documents; the applicable document will take precedence. This Users Guide is organized in three main sections. Chapter 1 provides an overview of the NDS and CDA hardware and the operations concepts for the NDS. Chapter 2 provides information for Host Vehicle Program integration with the NDS Project Office. Chapter 2 describes the NDS Project organization, integration and verification processes, user responsibilities, and specification and interface requirement documents. Chapter 3 provides a summary of basic technical information for the NDS design. Chapter 3 includes NDS hardware component descriptions, physical size and weight characteristics, and summary of the capabilities and constraints for the various NDS sub-systems.

  20. An analysis of electronic document management in oncology care.

    PubMed

    Poulter, Thomas; Gannon, Brian; Bath, Peter A

    2012-06-01

    In this research in progress, a reference model for the use of electronic patient record (EPR) systems in oncology is described. The model, termed CICERO, comprises technical and functional components, and emphasises usability, clinical safety and user acceptance. One of the functional components of the model-an electronic document and records management (EDRM) system-is monitored in the course of its deployment at a leading oncology centre in the UK. Specifically, the user requirements and design of the EDRM solution are described.The study is interpretative and forms part a wider research programme to define and validate the CICERO model. Preliminary conclusions confirm the importance of a socio-technical perspective in Onco-EPR system design.

  1. Employment of telemedicine in emergency medicine. Clinical requirement analysis, system development and first test results.

    PubMed

    Czaplik, M; Bergrath, S; Rossaint, R; Thelen, S; Brodziak, T; Valentin, B; Hirsch, F; Beckers, S K; Brokmann, J C

    2014-01-01

    Demographic change, rising co-morbidity and an increasing number of emergencies are the main challenges that emergency medical services (EMS) in several countries worldwide are facing. In order to improve quality in EMS, highly trained personnel and well-equipped ambulances are essential. However several studies have shown a deficiency in qualified EMS physicians. Telemedicine emerges as a complementary system in EMS that may provide expertise and improve quality of medical treatment on the scene. Hence our aim is to develop and test a specific teleconsultation system. During the development process several use cases were defined and technically specified by medical experts and engineers in the areas of: system administration, start-up of EMS assistance systems, audio communication, data transfer, routine tele-EMS physician activities and research capabilities. Upon completion, technical field tests were performed under realistic conditions to test system properties such as robustness, feasibility and usability, providing end-to-end measurements. Six ambulances were equipped with telemedical facilities based on the results of the requirement analysis and 55 scenarios were tested under realistic conditions in one month. The results indicate that the developed system performed well in terms of usability and robustness. The major challenges were, as expected, mobile communication and data network availability. Third generation networks were only available in 76.4% of the cases. Although 3G (third generation), such as Universal Mobile Telecommunications System (UMTS), provides beneficial conditions for higher bandwidth, system performance for most features was also acceptable under adequate 2G (second generation) test conditions. An innovative concept for the use of telemedicine for medical consultations in EMS was developed. Organisational and technical aspects were considered and practical requirements specified. Since technical feasibility was demonstrated in these technical field tests, the next step would be to prove medical usefulness and technical robustness under real conditions in a clinical trial.

  2. 75 FR 16817 - Meeting for Software Developers on the Technical Specifications for Common Formats for Patient...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... Software Developers on the Technical Specifications for Common Formats for Patient Safety Data Collection... software developers can provide input on these technical specifications for the Common Formats Version 1.1... specifications, which provide direction to software developers that plan to implement the Common Formats...

  3. The NASA Advanced Space Power Systems Project

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  4. Coherent anti-Stokes Raman scattering microscopy: overcoming technical barriers for clinical translation

    PubMed Central

    Tu, Haohua; Boppart, Stephen A.

    2015-01-01

    Clinical translation of coherent anti-Stokes Raman scattering microscopy is of great interest because of the advantages of noninvasive label-free imaging, high sensitivity, and chemical specificity. For this to happen, we have identified and review the technical barriers that must be overcome. Prior investigations have developed advanced techniques (features), each of which can be used to effectively overcome one particular technical barrier. However, the implementation of one or a small number of these advanced features in previous attempts for clinical translation has often introduced more tradeoffs than benefits. In this review, we outline a strategy that would integrate multiple advanced features to overcome all the technical barriers simultaneously, effectively reduce tradeoffs, and synergistically optimize CARS microscopy for clinical translation. The operation of the envisioned system incorporates coherent Raman micro-spectroscopy for identifying vibrational biomolecular markers of disease and single-frequency (or hyperspectral) Raman imaging of these specific biomarkers for real-time in vivo diagnostics and monitoring. An optimal scheme of clinical CARS micro-spectroscopy for thin ex vivo tissues. PMID:23674234

  5. Comparison study of the technical characteristics and financial analysis of electric battery storage systems for residential grid

    NASA Astrophysics Data System (ADS)

    Palivos, Marios; Vokas, Georgios A.; Anastasiadis, Anestis; Papageorgas, Panagiotis; Salame, Chafic

    2018-05-01

    One of the major energy issues of our days is reliable and effective energy generation and supply of electricity grids. In recent years there has been experienced a rapid development and implementation of Renewable Energy Sources (RES) worldwide. On one hand, many Gigawatts of grid-connected renewables are being installed and on the other many Megawatts of hybrid renewable systems for residential use are being installed making use of electric battery systems, in order to cover all daily energy and power needs during. New types of batteries are being developed and many companies have made great progress providing a variety of electricity storage products. The purpose of this research is firstly to highlight the necessity and also the importance of the use of energy storage systems and secondly, through detailed technical and financial simulation analysis using HOMER Pro-optimization software, to compare the technical characteristics and performance of energy storage systems by various leading companies when installed in a residential renewable energy system with a specific load and at the same time to provide the most efficient system economically. Results concerning the operation and the choice of a storage system are derived.

  6. Scientific profile and professional responsibility of Court-appointed Medical Technical Consultants in Italy: time for a specific educational curriculum?

    PubMed

    Conti, Andrea Alberto

    2014-08-20

    Court-appointed Technical Consultants (CTCs) are fundamental figures in the Italian judicial system. CTCs are experts appointed by judges in order to supplement their activities by ascertaining, collecting and analyzing facts concerning the specific subject of a lawsuit. These experts formulate opinions, gather motivations and perform checks to provide clear, objective and irrefutable answers to the questions posed by judges. With direct reference to the medical field, while police doctors (specialists in forensic medicine) follow an academic, dedicated, well-structured educational curriculum, the University specialty school in Forensic Medicine, other medical CTCs, though not infrequently luminaries with one or many medical specialties and professional acknowledgments, may have no specific legal-medicine and juridical expertise, precisely because a similar expertise is not formally required of them. In the light of these considerations, in Italy some professionals of the legal world, and of the health context too, have proposed for medical CTCs targeted educational pathways, which would provide these experts with formal specific qualifications. In synthesis and in conclusion, a full knowledge and a rigorous respect of the rules of legal proceedings emerge as increasingly important characteristics for current and future Court-appointed Technical Consultants, together with a specific educational curriculum.

  7. Approach to implementing a DICOM network: incorporate both economics and workflow adaptation

    NASA Astrophysics Data System (ADS)

    Beaver, S. Merritt; Sippel-Schmidt, Teresa M.

    1995-05-01

    This paper describes an approach to aide in the decision-making process for the justification and design of a digital image and information management system. It identifies key technical and clinical issues that need to be addressed by a healthcare institution during this process. Some issues identified here are very controversial and may take months or years for a department to determine solutions which meet their specific staffing, financial, and technical needs.

  8. Mobile communications satellite antenna flight experiment definition

    NASA Technical Reports Server (NTRS)

    Freeland, Robert E.

    1987-01-01

    Results of a NASA-sponsored study to determine the technical feasibility and cost of a Shuttle-based flight experiment specifically intended for the MSAT commercial user community are presented. The experiment will include demonstrations of technology in the areas of radio frequency, sensing and control, and structures. The results of the structural subsystem study summarized here include experiment objective and technical approach, experiment structural description, structure/environment interactions, structural characterization, thermal characterization, structural measurement system, and experiment functional description.

  9. Development of an Open Building Automation System Specification Based on ANSI/ASHRAE 135-2004 (BACnet(R) Communications Protocol: A Technical Assessment

    DTIC Science & Technology

    2007-02-01

    on/off control), trending and trend reports, load shedding/load manage- ment, remote setpoint adjustment, initial diagnosis of a service call and...building-specific operational data such as on/off scheduling com- mands, setpoints , and outside air temperature. With help from several other agencies and...interface for monitoring 3. Provide one interface for device/system management/configuration 4. ( Optimally ) provide one interface for device

  10. Development of an Open Building Automation System Specification Based on ANSI/ASHRAE 135-2004 (BACnet(Registered) Communications Protocol): A Technical Assessment

    DTIC Science & Technology

    2007-02-01

    on/off control), trending and trend reports, load shedding/load manage- ment, remote setpoint adjustment, initial diagnosis of a service call and...building-specific operational data such as on/off scheduling com- mands, setpoints , and outside air temperature. With help from several other agencies and...interface for monitoring 3. Provide one interface for device/system management/configuration 4. ( Optimally ) provide one interface for device

  11. Planetary Data Workshop, Part 2

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Technical aspects of the Planetary Data System (PDS) are addressed. Methods and tools for maintaining and accessing large, complex sets of data are discussed. The specific software and applications needed for processing imaging and non-imaging science data are reviewed. The need for specific software that provides users with information on the location and geometry of scientific observations is discussed. Computer networks and user interface to the PDS are covered along with Computer hardware available to this data system.

  12. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  13. California State Library: Processing Center Design and Specifications. Volume I, System Description and Input Processing.

    ERIC Educational Resources Information Center

    Sherman, Don; Shoffner, Ralph M.

    The scope of the California State Library-Processing Center (CSL-PC) project is to develop the design and specifications for a computerized technical processing center to provide services to a network of participating California libraries. Immediate objectives are: (1) retrospective conversion of card catalogs to a machine-form data base,…

  14. Scaffold translation: barriers between concept and clinic.

    PubMed

    Hollister, Scott J; Murphy, William L

    2011-12-01

    Translation of scaffold-based bone tissue engineering (BTE) therapies to clinical use remains, bluntly, a failure. This dearth of translated tissue engineering therapies (including scaffolds) remains despite 25 years of research, research funding totaling hundreds of millions of dollars, over 12,000 papers on BTE and over 2000 papers on BTE scaffolds alone in the past 10 years (PubMed search). Enabling scaffold translation requires first an understanding of the challenges, and second, addressing the complete range of these challenges. There are the obvious technical challenges of designing, manufacturing, and functionalizing scaffolds to fill the Form, Fixation, Function, and Formation needs of bone defect repair. However, these technical solutions should be targeted to specific clinical indications (e.g., mandibular defects, spine fusion, long bone defects, etc.). Further, technical solutions should also address business challenges, including the need to obtain regulatory approval, meet specific market needs, and obtain private investment to develop products, again for specific clinical indications. Finally, these business and technical challenges present a much different model than the typical research paradigm, presenting the field with philosophical challenges in terms of publishing and funding priorities that should be addressed as well. In this article, we review in detail the technical, business, and philosophical barriers of translating scaffolds from Concept to Clinic. We argue that envisioning and engineering scaffolds as modular systems with a sliding scale of complexity offers the best path to addressing these translational challenges. © Mary Ann Liebert, Inc.

  15. Swarming Unmanned Aircraft Systems

    DTIC Science & Technology

    2008-09-01

    systems may become a viable part of strategy and tactics in the future. Specific to Unmanned Aircraft Sys- tems ( UAS ). they see a strong and central...system itself. They do not want to limit direct access to only Military Occupational Specialty (MOS) trained UAS operators. Rather, they feel that...Collaborating (SASC) characteristics within swarms of UAS that support operations. Technical Approach The approach taken to model this system begins with an

  16. The Importance of Information Requirements in Designing Acquisition to Information Systems

    NASA Technical Reports Server (NTRS)

    Davis, Bruce A.; Hill, Chuck; Maughan, Paul M.

    1998-01-01

    The partnership model used by NASA's Commercial Remote Sensing Program has been successful in better defining remote sensing functional requirements and translation to technical specifications to address environmental needs of the 21st century.

  17. 7 CFR 2003.22 - Functional organization of RUS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...

  18. 7 CFR 2003.22 - Functional organization of RUS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...

  19. 7 CFR 2003.22 - Functional organization of RUS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...

  20. 7 CFR 2003.22 - Functional organization of RUS.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...

  1. 7 CFR 2003.22 - Functional organization of RUS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...

  2. 76 FR 25787 - Medicare Program; Proposed Changes to the Hospital Inpatient Prospective Payment Systems for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... A. Hospital Inpatient Quality Reporting Program 1. Background a. Overview b. Statutory History and History of Measures Adopted for the Hospital IQR Program c. Maintenance of Technical Specifications for...

  3. The photomultiplier tube calibration system of the MicroBooNE experiment

    DOE PAGES

    Conrad, J.; Jones, B. J. P.; Moss, Z.; ...

    2015-06-03

    Here, we report on the design and construction of a LED-based fiber calibration system for large liquid argon time projection detectors. This system was developed to calibrate the optical systems of the MicroBooNE experiment. As well as detailing the materials and installation procedure, we provide technical drawings and specifications so that the system may be easily replicated in future LArTPC detectors.

  4. A technical evaluation of the Nucletron FIRST system: conformance of a remote afterloading brachytherapy seed implantation system to manufacturer specifications and AAPM Task Group report recommendations.

    PubMed

    Rivard, Mark J; Evans, Dee-Ann Radford; Kay, Ian

    2005-01-01

    The Fully Integrated Real-time Seed Treatment (FIRST) system by Nucletron has been available in Europe since November 2001 and is being used more and more in Canada and the United States. Like the conventional transrectal ultrasound implant procedure, the FIRST system utilizes an ultrasound probe, needles, and brachytherapy seeds. However, this system is unique in that it (1) utilizes a low-dose-rate brachytherapy seed remote afterloader (the seedSelectron), (2) utilizes 3D image reconstruction acquired from electromechanically controlled, nonstepping rotation of the ultrasound probe, (3) integrates the control of a remote afterloader with electromechanical control of the ultrasound probe for integrating the clinical procedure into a single system, and (4) automates the transfer of planning information and seed delivery to improve quality assurance and radiation safety. This automated delivery system is specifically intended to address reproducibility and accuracy of seed positioning during implantation. The FIRST computer system includes two software environments: SPOT PRO and seedSelectron; both are used to facilitate treatment planning and brachytherapy seed implantation from beginning to completion of the entire procedure. In addition to these features, the system is reported to meet certain product specifications for seed delivery positioning accuracy and reproducibility, seed calibration accuracy and reliability, and brachytherapy dosimetry calculations. Consequently, a technical evaluation of the FIRST system was performed to determine adherence to manufacturer specifications and to the American Association of Physicists in Medicine (AAPM) Task Group Reports 43, 53, 56, 59, and 64 and recommendations of the American Brachytherapy Society (ABS). The United States Nuclear Regulatory Commission (NRC) has recently added Licensing Guidance for the seedSelectron system under 10 CFR 35.1000. Adherence to licensing guidance is made by referencing applicable AAPM Task Group recommendations. In general, results of this evaluation indicated that the system met its claimed specifications as well as the applicable recommendations outlined in the AAPM and ABS reports.

  5. Features and limitations of mobile tablet devices for viewing radiological images.

    PubMed

    Grunert, J H

    2015-03-01

    Mobile radiological image display systems are becoming increasingly common, necessitating a comparison of the features of these systems, specifically the operating system employed, connection to stationary PACS, data security and rang of image display and image analysis functions. In the fall of 2013, a total of 17 PACS suppliers were surveyed regarding the technical features of 18 mobile radiological image display systems using a standardized questionnaire. The study also examined to what extent the technical specifications of the mobile image display systems satisfy the provisions of the Germany Medical Devices Act as well as the provisions of the German X-ray ordinance (RöV). There are clear differences in terms of how the mobile systems connected to the stationary PACS. Web-based solutions allow the mobile image display systems to function independently of their operating systems. The examined systems differed very little in terms of image display and image analysis functions. Mobile image display systems complement stationary PACS and can be used to view images. The impacts of the new quality assurance guidelines (QS-RL) as well as the upcoming new standard DIN 6868 - 157 on the acceptance testing of mobile image display units for the purpose of image evaluation are discussed. © Georg Thieme Verlag KG Stuttgart · New York.

  6. The non-technical skills used by anaesthetic technicians in critical incidents reported to the Australian Incident Monitoring System between 2002 and 2008.

    PubMed

    Rutherford, J S; Flin, R; Irwin, A

    2015-07-01

    The outcome of critical incidents in the operating theatre has been shown to be influenced by the behaviour of anaesthetic technicians (ATs) assisting anaesthetists, but the specific non-technical skills involved have not been described. We performed a review of critical incidents (n=1433) reported to the Australian Incident Monitoring System between 2002 and 2008 to identify which non-technical skills were used by ATs. The reports were assessed if they mentioned anaesthetic assistance or had the boxes ticked to identify "inadequate assistance" or "absent supervision or assistance". A total of 90 critical incidents involving ATs were retrieved, 69 of which described their use of non-technical skills. In 20 reports, the ATs ameliorated the critical incident, whilst in 46 they exacerbated the critical incident, and three cases had both positive and negative non-technical skills described. Situation awareness was identified in 39 reports, task management in 23, teamwork in 21 and decision-making in two, but there were no descriptions of issues related to leadership, stress or fatigue management. Situation awareness, task management and teamwork appear to be important non-technical skills for ATs in the development or management of critical incidents in the operating theatre. This analysis has been used to support the development of a non-technical skills taxonomy for anaesthetic assistants.

  7. [OurPuppet - Caring support with an interactive puppet for informal caregivers : Opportunities and challenges in the social and technical developmental process].

    PubMed

    Kuhlmann, Andrea; Reuter, Verena; Schramek, Renate; Dimitrov, Todor; Görnig, Matthias; Matip, Eva-Maria; Matthies, Olaf; Naroska, Edwin

    2018-01-01

    The "OurPuppet" project comprises a sensor-based, interactive puppet that will be developed to communicate with people in need of care during a short period of absence of the informal caregiver. Specially qualified puppet guides will support the use of the new technical development. They instruct people with dementia and caregivers on how to use the puppet and supervise the (informal) care relationship through discussions on a regular basis. The article shows the specific components of users' needs for which the concrete technical development should find answers. It also focuses on the opportunities and challenges for the technical and social developmental process accompanied by these demands. The analysis of the users' needs is based on a participatory approach. Semi-structured focus group interviews were conducted with informal caregivers, nurses and volunteers in order to identify typical situations in home care settings. The interviews were paraphrased and summarized in order to deduce inductive categories (qualitative data analysis), which describe everyday situations that the technical system should address. Such analyses provide information about the needs of potential users and indicate how to design such technical systems. Furthermore, opportunities and challenges of the development process as well as important contextual information were identified.

  8. Automatic Requirements Specification Extraction from Natural Language (ARSENAL)

    DTIC Science & Technology

    2014-10-01

    designers, implementers) involved in the design of software systems. However, natural language descriptions can be informal, incomplete, imprecise...communication of technical descriptions between the various stakeholders (e.g., customers, designers, imple- menters) involved in the design of software systems...the accuracy of the natural language processing stage, the degree of automation, and robustness to noise. 1 2 Introduction Software systems operate in

  9. The Free-Form-Five (ff5): A Canadian "Casework" or Furniture and Equipment System for Schools. Programme on Educational Building 4.

    ERIC Educational Resources Information Center

    Lenssen, Paul

    The fourth in a series of leaflets designed for dissemination of information on school building, this publication describes a caseworks subsystem consisting of storage systems, surface systems, plumbing and electrical services, and seating. The technical performance specifications for this subsystem and nine others were developed as a product of…

  10. 78 FR 36369 - Heavy-Duty Engine and Vehicle, and Nonroad Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... reference to post-transmissions systems in the hybrid engine test requirements in 40 CFR part 1036 and 49... requirements for testing post-transmission hybrids using a vehicle test. The agencies anticipate that there... out in the regulation specify how to test post-transmission systems. Specifically, 40 CFR 1037.525, 40...

  11. Recommended Practices for the Safe Design and Operation of Flywheels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bender, Donald Arthur

    2015-12-01

    Flywheel energy storage systems are in use globally in increasing numbers . No codes pertaining specifically to flywheel energy storage exist. A number of industrial incidents have occurred. This protocol recommends a technical basis for safe flywheel de sign and operation for consideration by flywheel developers, users of flywheel systems and standards setting organizations.

  12. Model Adoption Exchange Payment System: Technical Specifications and User Instructions.

    ERIC Educational Resources Information Center

    Ambrosino, Robert J.

    This user's manual, designed to meet the needs of adoption exchange administrators and program managers for a formal tool to assist them in the overall management and operation of their program, presents the Model Adoption Exchange Payment System (MAEPS), which was developed to improve the delivery of adoption exchange services throughout the…

  13. Logical Aspects of Question-Answering by Computer.

    ERIC Educational Resources Information Center

    Kuhns, J. L.

    The problem of computerized question-answering is discussed in this paper from the point of view of certain technical, although elementary, notions of logic. Although the work reported herein has general application to the design of information systems, it is specifically motivated by the RAND Relational Data File. This system, for which a…

  14. 78 FR 48407 - Defense Federal Acquisition Regulation Supplement: Clauses With Alternates-Quality Assurance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or...

  15. A One System Integrated Approach to Simulant Selection for Hanford High Level Waste Mixing and Sampling Tests - 13342

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thien, Mike G.; Barnes, Steve M.

    2013-07-01

    The Hanford Tank Operations Contractor (TOC) and the Hanford Waste Treatment and Immobilization Plant (WTP) contractor are both engaged in demonstrating mixing, sampling, and transfer system capabilities using simulated Hanford High-Level Waste (HLW) formulations. This represents one of the largest remaining technical issues with the high-level waste treatment mission at Hanford. Previous testing has focused on very specific TOC or WTP test objectives and consequently the simulants were narrowly focused on those test needs. A key attribute in the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2 is to ensure testing is performed with a simulant that represents the broadmore » spectrum of Hanford waste. The One System Integrated Project Team is a new joint TOC and WTP organization intended to ensure technical integration of specific TOC and WTP systems and testing. A new approach to simulant definition has been mutually developed that will meet both TOC and WTP test objectives for the delivery and receipt of HLW. The process used to identify critical simulant characteristics, incorporate lessons learned from previous testing, and identify specific simulant targets that ensure TOC and WTP testing addresses the broad spectrum of Hanford waste characteristics that are important to mixing, sampling, and transfer performance are described. (authors)« less

  16. Improving results for carotid artery stenting by validation of the anatomic scoring system for carotid artery stenting with patient-specific simulated rehearsal.

    PubMed

    Willaert, Willem I M; Cheshire, Nicholas J; Aggarwal, Rajesh; Van Herzeele, Isabelle; Stansby, Gerard; Macdonald, Sumaira; Vermassen, Frank E

    2012-12-01

    Carotid artery stenting (CAS) is a technically demanding procedure with a risk of periprocedural stroke. A scoring system based on anatomic criteria has been developed to facilitate patient selection for CAS. Advancements in simulation science also enable case evaluation through patient-specific virtual reality (VR) rehearsal on an endovascular simulator. This study aimed to validate the anatomic scoring system for CAS using the patient-specific VR technology. Three patients were selected and graded according to the CAS scoring system (maximum score, 9): one easy (score, <4.9), one intermediate (score, 5.0-5.9), and one difficult (score, >7.0). The three cases were performed on the simulator in random order by 20 novice interventionalists pretrained in CAS. Technical performances were assessed using simulator-based metrics and expert-based ratings. The interventionalists took significantly longer to perform the difficult CAS case (median, 31.6 vs 19.7 vs 14.6 minutes; P<.0001) compared with the intermediate and easy cases; similarly, more fluoroscopy time (20.7 vs 12.1 vs 8.2 minutes; P<.0001), contrast volume (56.5 vs 51.5 vs 50.0 mL; P=.0060), and roadmaps (10 vs 9 vs 9; P=.0040) were used. The quality of performance declined significantly as the cases became more challenging (score, 24 vs 22 vs 19; P<.0001). The anatomic scoring system for CAS can predict the difficulty of a CAS procedure as measured by patient-specific VR. This scoring system, with or without the additional use of patient-specific VR, can guide novice interventionalists in selecting appropriate patients for CAS. This may reduce the perioperative stroke risk and enhance patient safety. Copyright © 2012 Society for Vascular Surgery. Published by Mosby, Inc. All rights reserved.

  17. Technical Manual for the SAM Physical Trough Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, M. J.; Gilman, P.

    2011-06-01

    NREL, in conjunction with Sandia National Lab and the U.S Department of Energy, developed the System Advisor Model (SAM) analysis tool for renewable energy system performance and economic analysis. This paper documents the technical background and engineering formulation for one of SAM's two parabolic trough system models in SAM. The Physical Trough model calculates performance relationships based on physical first principles where possible, allowing the modeler to predict electricity production for a wider range of component geometries than is possible in the Empirical Trough model. This document describes the major parabolic trough plant subsystems in detail including the solar field,more » power block, thermal storage, piping, auxiliary heating, and control systems. This model makes use of both existing subsystem performance modeling approaches, and new approaches developed specifically for SAM.« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jansen, F.

    The use of integrated PET/MRI systems in clinical applications can best benefit from understanding their technological advances and limitations. The currently available clinical PET/MRI systems have their own characteristics. Thorough analyses of existing technical data and evaluation of necessary performance metrics for quality assurances could be conducted to optimize application-specific PET/MRI protocols. This Symposium will focus on technical advances and limitations of clinical PET/MRI systems, and how this exciting imaging modality can be utilized in applications that can benefit from both PET and MRI. Learning Objectives: To understand the technological advances of clinical PET/MRI systems To correctly identify clinical applicationsmore » that can benefit from PET/MRI To understand ongoing work to further improve the current PET/MRI technology Floris Jansen is a GE Healthcare employee.« less

  19. Quantifying control effort of biological and technical movements: an information-entropy-based approach.

    PubMed

    Haeufle, D F B; Günther, M; Wunner, G; Schmitt, S

    2014-01-01

    In biomechanics and biorobotics, muscles are often associated with reduced movement control effort and simplified control compared to technical actuators. This is based on evidence that the nonlinear muscle properties positively influence movement control. It is, however, open how to quantify the simplicity aspect of control effort and compare it between systems. Physical measures, such as energy consumption, stability, or jerk, have already been applied to compare biological and technical systems. Here a physical measure of control effort based on information entropy is presented. The idea is that control is simpler if a specific movement is generated with less processed sensor information, depending on the control scheme and the physical properties of the systems being compared. By calculating the Shannon information entropy of all sensor signals required for control, an information cost function can be formulated allowing the comparison of models of biological and technical control systems. Exemplarily applied to (bio-)mechanical models of hopping, the method reveals that the required information for generating hopping with a muscle driven by a simple reflex control scheme is only I=32 bits versus I=660 bits with a DC motor and a proportional differential controller. This approach to quantifying control effort captures the simplicity of a control scheme and can be used to compare completely different actuators and control approaches.

  20. Scoping Report: Advanced Technologies for Multi-Load Washers in Hospitality and Healthcare

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, Graham B.; Boyd, Brian K.; Petersen, Joseph M.

    The purpose of this demonstration project is to quantify the energy savings and water efficiency potential of commercial laundry wastewater recycling systems and low-temperature detergent supply systems to help promote the adoption of these technologies in the commercial sector. This project will create a set of technical specifications for efficient multi-load laundry systems (both new and retrofit) tailored for specific applications and/or sectors (e.g., hospitality, health care). The specifications will be vetted with the appropriate Better Buildings Alliance (BBA) members (e.g., Commercial Real Estate Energy Alliance, Hospital Energy Alliance), finalized, published, and disseminated to enable widespread technology transfer in themore » industry and specifically among BBA partners.« less

  1. TU-G-201-00: Imaging Equipment Specification and Selection in Radiation Oncology Departments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This session will update therapeutic physicists on technological advancements and radiation oncology features of commercial CT, MRI, and PET/CT imaging systems. Also described are physicists’ roles in every stage of equipment selection, purchasing, and operation, including defining specifications, evaluating vendors, making recommendations, and optimal and safe use of imaging equipment in radiation oncology environment. The first presentation defines important terminology of CT and PET/CT followed by a review of latest innovations, such as metal artifact reduction, statistical iterative reconstruction, radiation dose management, tissue classification by dual energy CT and spectral CT, improvement in spatial resolution and sensitivity in PET, andmore » potentials of PET/MR. We will also discuss important technical specifications and items in CT and PET/CT purchasing quotes and their impacts. The second presentation will focus on key components in the request for proposal for a MRI simulator and how to evaluate vendor proposals. MRI safety issues in radiation Oncology, including MRI scanner Zones (4-zone design), will be discussed. Basic MR terminologies, important functionalities, and advanced features, which are relevant to radiation therapy, will be discussed. In the third presentation, justification of imaging systems for radiation oncology, considerations in room design and construction in a RO department, shared use with diagnostic radiology, staffing needs and training, clinical/research use cases and implementation, will be discussed. The emphasis will be on understanding and bridging the differences between diagnostic and radiation oncology installations, building consensus amongst stakeholders for purchase and use, and integrating imaging technologies into the radiation oncology environment. Learning Objectives: Learn the latest innovations of major imaging systems relevant to radiation therapy Be able to describe important technical specifications of CT, MRI, and PET/CT Understand the process of budget request, equipment justification, comparisons of technical specifications, site visits, vendor selection, and contract development.« less

  2. Overview of Energy Systems' safety analysis report programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility's safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This Overview of Energy Systems Safety Analysis Report Programs'' Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less

  3. Overview of Energy Systems` safety analysis report programs. Safety Analysis Report Update Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility`s safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This ``Overview of Energy Systems Safety Analysis Report Programs`` Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less

  4. Technical Submission Form: Technical Specification of a Wave Energy Farm.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Jesse D.; Nielsen, Kim; Kennedy, Ben

    The Wave - SPARC project developed the Technology Performance Level (TPL) assessment procedure based on a rigorous Systems Engineering exercise. The TPL assessment allows a whole system evaluation of Wave Energy Conversion Technology by measuring it against the requirements determined through the Systems Engineering exercise. The TPL assessment is intended to be useful in technology evaluation; in technology innovation; in allocation of public or priva te investment, and; in making equipment purchasing decisions. This Technical Submission Form (TSF) serves the purpose of collecting relevant and complete information, in a technology agnostic way, to allow TPL assessment s to be mademore » by third party assessor s. The intended usage of this document is that the organization or people that are performing the role of developers or promoters of a particular technology will use this form to provide the information necessary for the organization or people who are perf orming the assessor role to use the TPL assessment.« less

  5. Technical Support Task Report for the Modernization of Defense Logistics Standard Systems. Volume 3: Logistics Gateway Node Technical Specifications

    DTIC Science & Technology

    1991-05-01

    or may not bypass the editing function. At present, editing rules beyond those required for translation have not been stipulated. 2When explicit... editing rules become defined, the editor at a site LGN may perform two levels of edit checking: warning, which would insert blanks or pass as submitted...position image transactions into a transaction set. This low-level edit checking is performed at the site LGN to reduce transmission costs and to

  6. Package research based on COM+ technical of web service

    NASA Astrophysics Data System (ADS)

    Liu, Xiaoyue; Du, Liang

    2011-10-01

    Early information management systems are established for realization of specific business functions ordered by enterprise, including the control and management of production, supply, sales and customer service and so on. Enterprises in accordance with their various departments establish a variety of enterprise information systems used by them, and in the actual work play a huge role in the production. In this paper, from the overall view a variety of enterprise information management systems is considered, thereafter according to specific business needs to unify arrangement of these systems, and use a suitable platform for the organic integration of existing enterprise information management systems, so that the "information islands" link.

  7. Onshore industrial wind turbine locations for the United States

    USGS Publications Warehouse

    Diffendorfer, Jay E.; Compton, Roger; Kramer, Louisa; Ancona, Zach; Norton, Donna

    2017-01-01

    This dataset provides industrial-scale onshore wind turbine locations in the United States, corresponding facility information, and turbine technical specifications. The database has wind turbine records that have been collected, digitized, locationally verified, and internally quality controlled. Turbines from the Federal Aviation Administration Digital Obstacles File, through product release date July 22, 2013, were used as the primary source of turbine data points. The dataset was subsequently revised and reposted as described in the revision histories for the report. Verification of the turbine positions was done by visual interpretation using high-resolution aerial imagery in Environmental Systems Research Institute (Esri) ArcGIS Desktop. Turbines without Federal Aviation Administration Obstacles Repository System numbers were visually identified and point locations were added to the collection. We estimated a locational error of plus or minus 10 meters for turbine locations. Wind farm facility names were identified from publicly available facility datasets. Facility names were then used in a Web search of additional industry publications and press releases to attribute additional turbine information (such as manufacturer, model, and technical specifications of wind turbines). Wind farm facility location data from various wind and energy industry sources were used to search for and digitize turbines not in existing databases. Technical specifications for turbines were assigned based on the wind turbine make and model as described in literature, specifications listed in the Federal Aviation Administration Digital Obstacles File, and information on the turbine manufacturer’s Web site. Some facility and turbine information on make and model did not exist or was difficult to obtain. Thus, uncertainty may exist for certain turbine specifications. That uncertainty was rated and a confidence was recorded for both location and attribution data quality.

  8. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less

  9. Review and critical analysis: Rolling-element bearings for system life and reliability

    NASA Technical Reports Server (NTRS)

    Irwin, A. S.; Anderson, W. J.; Derner, W. J.

    1985-01-01

    A ball and cylindrical roller bearing technical specification which incorporates the latest state-of-the-art advancements was prepared for the purpose of improving bearing reliability in U.S. Army aircraft. The current U.S. Army aviation bearing designs and applications, including life analyses, were analyzed. A bearing restoration and refurbishment specification was prepared to improve bearing availability.

  10. Integrated Display and Environmental Awareness System - System Architecture Definition

    NASA Technical Reports Server (NTRS)

    Doule, Ondrej; Miranda, David; Hochstadt, Jake

    2017-01-01

    The Integrated Display and Environmental Awareness System (IDEAS) is an interdisciplinary team project focusing on the development of a wearable computer and Head Mounted Display (HMD) based on Commercial-Off-The-Shelf (COTS) components for the specific application and needs of NASA technicians, engineers and astronauts. Wearable computers are on the verge of utilization trials in daily life as well as industrial environments. The first civil and COTS wearable head mounted display systems were introduced just a few years ago and they probed not only technology readiness in terms of performance, endurance, miniaturization, operability and usefulness but also maturity of practice in perspective of a socio-technical context. Although the main technical hurdles such as mass and power were addressed as improvements on the technical side, the usefulness, practicality and social acceptance were often noted on the side of a broad variety of humans' operations. In other words, although the technology made a giant leap, its use and efficiency still looks for the sweet spot. The first IDEAS project started in January 2015 and was concluded in January 2017. The project identified current COTS systems' capability at minimum cost and maximum applicability and brought about important strategic concepts that will serve further IDEAS-like system development.

  11. 45 CFR 162.920 - Availability of implementation specifications and operating rules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Technical Report Type 3. The implementation specifications for the ASC X12N and the ASC X12 Standards for Electronic Data Interchange Technical Report Type 3 (and accompanying Errata or Type 1 Errata) may be... charged for all implementation specifications, including Technical Reports Type 3. Charging for such...

  12. 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...

  13. 10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...

  14. Technical feasibility of personalized articulating knee joint distraction for treatment of tibiofemoral osteoarthritis.

    PubMed

    Struik, T; Jaspers, J E N; Besselink, N J; van Roermund, P M; Plomp, S; Rudert, M J; Lafeber, F P J G; Mastbergen, S C

    2017-11-01

    Knee osteoarthritis is a highly prevalent degenerative joint disorder characterized by joint tissue damage and pain. Knee joint distraction has been introduced as a joint preserving surgical procedure to postpone knee arthroplasty. An often used standard externally fixation device for distraction poses a burden to patients due to the absence of joint flexion during the 6weeks treatment. Therefore, a personalized articulating distraction device was developed. The aim of this study was to test technical feasibility of this device. Based on an often applied rigid device, using equal bone pin positions and connectors, a hinge mechanism was developed consisting of a cam-following system for reproducing the complex joint-specific knee kinematics. In support, a device was developed for capturing the joint-specific sagittal plane articulation. The obtained kinematic data were translated into joint-specific cam shapes that were installed bilaterally in the hinge mechanism of the distraction device, as such providing personalized knee motion. Distraction of 5mm was performed within a range of motion of 30deg. joint flexion. Pre-clinical evaluation of the working principle was performed on human cadaveric legs and system stiffness characteristics were biomechanically evaluated. The desired range of motion was obtained and distraction was maintained under physiologically representative loading. Moreover, the joint-specific approach demonstrated tolerance of deviations from anatomical and alignment origin during initial placement of the developed distraction device. Articulation during knee distraction is considered technically feasible and has potential to decrease burden and improve acceptance of distraction therapy. Testing of clinical feasibility is warranted. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Large liquid rocket engine transient performance simulation system

    NASA Technical Reports Server (NTRS)

    Mason, J. R.; Southwick, R. D.

    1989-01-01

    Phase 1 of the Rocket Engine Transient Simulation (ROCETS) program consists of seven technical tasks: architecture; system requirements; component and submodel requirements; submodel implementation; component implementation; submodel testing and verification; and subsystem testing and verification. These tasks were completed. Phase 2 of ROCETS consists of two technical tasks: Technology Test Bed Engine (TTBE) model data generation; and system testing verification. During this period specific coding of the system processors was begun and the engineering representations of Phase 1 were expanded to produce a simple model of the TTBE. As the code was completed, some minor modifications to the system architecture centering on the global variable common, GLOBVAR, were necessary to increase processor efficiency. The engineering modules completed during Phase 2 are listed: INJTOO - main injector; MCHBOO - main chamber; NOZLOO - nozzle thrust calculations; PBRNOO - preburner; PIPE02 - compressible flow without inertia; PUMPOO - polytropic pump; ROTROO - rotor torque balance/speed derivative; and TURBOO - turbine. Detailed documentation of these modules is in the Appendix. In addition to the engineering modules, several submodules were also completed. These submodules include combustion properties, component performance characteristics (maps), and specific utilities. Specific coding was begun on the system configuration processor. All functions necessary for multiple module operation were completed but the SOLVER implementation is still under development. This system, the Verification Checkout Facility (VCF) allows interactive comparison of module results to store data as well as provides an intermediate checkout of the processor code. After validation using the VCF, the engineering modules and submodules were used to build a simple TTBE.

  16. Development of the Engineering Test Satellite-3 (ETS-3) ion engine system

    NASA Technical Reports Server (NTRS)

    Kitamura, S.

    1984-01-01

    The ion engine system onboard the ETS-3 is discussed. The system consists of two electron bombardment type mercury ion engines with 2 mN thrust and 2,000 sec specific impulse and a power conditioner with automatic control functions. The research and development of the system, development of its EM, PM and FM, the system test and the technical achievements leading up to final launch are discussed.

  17. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  18. The problems inherent in teaching technical writing and report writing to native Americans

    NASA Technical Reports Server (NTRS)

    Zukowski/faust, J.

    1981-01-01

    Teaching technical writing to Native Americans contending with a second language and culture is addressed. Learning difficulties arising from differences between native and acquired language and cultural systems are examined. Compartmentalized teaching, which presents the ideals of technical writing in minimal units, and skills development are considered. Rhetorical problems treated include logic of arrangement, selection of support and scope of detail, and time and space. Specific problems selected include the concept of promptness, the contextualization of purpose, interpersonal relationships, wordiness, mixture of registers, and the problem of abstracting. Four inductive procedures for students having writing and perception problems are included. Four sample exercises and a bibliography of 13 references are also included.

  19. Thermal Storage Applications Workshop. Volume 2: Contributed Papers

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar thermal and the thermal and thermochemical energy storage programs are described as well as the technology requirements for both external (electrical) and internal (thermal, chemical) modes for energy storage in solar power plants. Specific technical issues addressed include thermal storage criteria for solar power plants interfacing with utility systems; optimal dispatch of storage for solar plants in a conventional electric grid; thermal storage/temperature tradeoffs for solar total energy systems; the value of energy storage for direct-replacement solar thermal power plants; systems analysis of storage in specific solar thermal power applications; the value of seasonal storage of solar energy; criteria for selection of the thermal storage system for a 10 MW(2) solar power plant; and the need for specific requirements by storage system development teams.

  20. HAMS (Hypoxia, Monitoring, and Mitigation System) II Quarterly Progress Report (Technical and Financial)

    DTIC Science & Technology

    2015-04-10

    Peripheral Interface SpO2 Arterial Oxygen Saturation Measured via Pulse - Oximeter SRS Software Requirements Specification SV Stroke Volume SVR Systemic...viewer ....................................................................................................... 9 Figure 3: Pulse OX custom module...analysis approaches will be gathered. Sensors which detect SpO2, pulse / pulse rate, ECG, and skin temperature will be researched and evaluated for

  1. Research and Development Project Summaries, October 1991

    DTIC Science & Technology

    1991-10-01

    delivery methods, training cost reduction, demonstration of technology’ effectiveness, and the reduction of acquisition risk . The majority of the work...demonstrations, risk reduction developments, and cost-effectiveness investigations in simulator and training technologzv. This advanced development program is a...systems. The program is organized around specific demonstration tasks that target critical technical risks that confront future weapons system

  2. 48 CFR 11.201 - Identification and availability of specifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Identification and... nongovernment standards, including voluntary consensus standards, from the National Technical Information... obtain from the DoDSSP those nongovernment standards, including voluntary consensus standards, adopted...

  3. Fourteenth NASTRAN (R) Users' Colloquium

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The proceedings of a colloquium are presented along with technical papers contributed during the conference. Reviewed are general applications of finite element methodology and the specific application of the NASA Structural Analysis System, NASTRAN, to a variety of static and dynamic sturctural problems.

  4. [Standardization of hospital feeding].

    PubMed

    Caracuel García, Ángel Manuel

    2015-05-07

    Normalization can be understood as the establishing measures against repetitive situations through the development, dissemination, and application of technical design documents called standards. In Andalusia there are 45 public hospitals with 14,606 beds, and in which 11,700 full pensions / day are served. The Working Group on Hospital Food Standardization of the Andalusian Society for Clinical Nutrition and Dietetics, started in 2010, working on the certification of suppliers, product specifications, and meals technical card. - Develop a specific tool to help improving food safety through the certification of their suppliers. - Develop a standardized technical specifications of foodstuffs necessary for the development of menus established codes diets Andalusian hospitals document. - Develop a catalog of data sheets plates of hospital meals, to homogenize menus, respecting local and unifying criteria for qualitative and quantitative ingredients. - Providing documentation and studying of several public hospitals in Andalusia: • Product specifications and certification of suppliers. • International standards certification and distribution companies. • Legislation. • Data sheets for the menu items. • Specifications of different product procurement procedures. - Development of the draft standard HOSPIFOOD®, and approval of the version “0.0”. - Training course for auditors to this standard. - Development of a raw materials catalog as technical cards. - Meals Technical cards review and election of the ones which will be part of the document. After nearly three years of work, we have achieved the following products: - Standardized database of technical specifications for the production of food dietary codes for: fish, seafood, meat and meat products, meats and pates, ready meals, bread and pastries, preserves, milk and dairy products, oils, cereals, legumes , vegetables, fruits, fresh and frozen vegetables, condiments and spices. - Standardized database of technical cards for meals containing the following data: SAS Code, Province, Hospital, name plate, ingredients (g), edible ingredients (g) kcal, Proteins, HC, Fat and Fiber. - HOSPIFOOD® standard certification for food providers in hospitals, school cafeterias and other institutions of social restoration. Patients expect food that is offered during the stay in the hospital, meet basic standards of quality and safety, and therefore it is necessary to design and develop control systems from the award and / or acquisition of food (raw materials and finished) products which subsequently become part of the menu that is offered as part of their treatment. To avoid the effect of fraudulent practice in public health, it’s needed to ensure the quality and safety of the food from the origin and establish the standards for acquisition and subsequent use of it.

  5. Creating and parameterizing patient-specific deep brain stimulation pathway-activation models using the hyperdirect pathway as an example.

    PubMed

    Gunalan, Kabilar; Chaturvedi, Ashutosh; Howell, Bryan; Duchin, Yuval; Lempka, Scott F; Patriat, Remi; Sapiro, Guillermo; Harel, Noam; McIntyre, Cameron C

    2017-01-01

    Deep brain stimulation (DBS) is an established clinical therapy and computational models have played an important role in advancing the technology. Patient-specific DBS models are now common tools in both academic and industrial research, as well as clinical software systems. However, the exact methodology for creating patient-specific DBS models can vary substantially and important technical details are often missing from published reports. Provide a detailed description of the assembly workflow and parameterization of a patient-specific DBS pathway-activation model (PAM) and predict the response of the hyperdirect pathway to clinical stimulation. Integration of multiple software tools (e.g. COMSOL, MATLAB, FSL, NEURON, Python) enables the creation and visualization of a DBS PAM. An example DBS PAM was developed using 7T magnetic resonance imaging data from a single unilaterally implanted patient with Parkinson's disease (PD). This detailed description implements our best computational practices and most elaborate parameterization steps, as defined from over a decade of technical evolution. Pathway recruitment curves and strength-duration relationships highlight the non-linear response of axons to changes in the DBS parameter settings. Parameterization of patient-specific DBS models can be highly detailed and constrained, thereby providing confidence in the simulation predictions, but at the expense of time demanding technical implementation steps. DBS PAMs represent new tools for investigating possible correlations between brain pathway activation patterns and clinical symptom modulation.

  6. Space Fence PDR Concept Development Phase

    NASA Astrophysics Data System (ADS)

    Haines, L.; Phu, P.

    2011-09-01

    The Space Fence, a major Air Force acquisition program, will become the dominant low-earth orbit uncued sensor in the space surveillance network (SSN). Its primary objective is to provide a 24/7 un-cued capability to find, fix, and track small objects in low earth orbit to include emerging and evolving threats, as well as the rapidly growing population of orbital debris. Composed of up to two geographically dispersed large-scale S-band phased array radars, this new system-of-systems concept will provide comprehensive Space Situational Awareness through net-centric operations and integrated decision support. Additionally, this program will facilitate cost saving force structure changes in the SSN, specifically including the decommissioning of very-high frequency VHF Air Force Space Surveillance System (AFSSS). The Space Fence Program Office entered a Preliminary Design Review (PDR) concept development phase in January 2011 to achieve the delivery of the Initial Operational Capability (IOC) expected in FY17. Two contractors were awarded to perform preliminary system design, conduct radar performance analyses and evaluations, and develop a functional PDR radar system prototype. The key objectives for the Phase A PDR effort are to reduce Space Fence total program technical, cost, schedule, and performance risk. The overall program objective is to achieve a preliminary design that demonstrates sufficient technical and manufacturing maturity and that represents a low risk, affordable approach to meet the Space Fence Technical Requirements Document (TRD) requirements for the final development and production phase to begin in 3QFY12. This paper provides an overview of the revised Space Fence program acquisition strategy for the Phase-A PDR phase to IOC, the overall program milestones and major technical efforts. In addition, the key system trade studies and modeling/simulation efforts undertaken during the System Design Requirement (SDR) phase to address and mitigate technical challenges of the Space Fence System will also be discussed. Examples include radar system optimization studies, modeling and simulation for system performance assessment, investigation of innovative Astrodynamics algorithms for initial orbit determination and observation correlation.

  7. [The Engineering and Technical Services Directorate at the Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Moon, James

    2004-01-01

    My name is James Moon and I am a senior at Tennessee State University where my major is Aeronautical and Industrial Technology with a concentration in industrial electronics. I am currently serving my internship in the Engineering and Technical Services Directorate at the Glenn Research Center (GRC). The Engineering and Technical Service Directorate provides the services and infrastructure for the Glenn Research Center to take research concepts to reality. They provide a full range of integrated services including engineering, advanced prototyping and testing, facility management, and information technology for NASA, industry, and academia. Engineering and Technical Services contains the core knowledge in Information Technology (IT). This includes data systems and analysis, inter and intranet based systems design and data security. Including the design and development of embedded real-time s o h a r e applications for flight and supporting ground systems, Engineering and Technical Services provide a wide range of IT services and products specific to the Glenn Research Center research and engineering community. In the 7000 Directorate I work directly in the 7611 organization. This organization is known as the Aviation Environments Technical Branch. My mentor is Vincent Satterwhite who is also the Branch Chief of the Aviation Environments Technical Branch. In this branch, I serve as the Assistant program manager of the Engineering Technology Program. The Engineering Technology Program (ETP) is one of three components of the High School L.E.R.C.I.P. This is an Agency-sponsored, eight-week research-based apprenticeship program designed to attract traditionally underrepresented high school students that demonstrate an aptitude for and interest in mathematics, science, engineering, and technology.

  8. Analysis of Technical Specifications of the Egyptian and French Electronic Storybooks (e-Storybook)

    ERIC Educational Resources Information Center

    Atta, Mohammed Mahmoud; Abd El Wahab, Shaimaa Mahmoud

    2015-01-01

    This research aims at analysing technical specifications in a sample of Egyptian and French electronic storybooks (e-storybooks), to identify similarities and differences in technical specifications of children's e-storybooks and create a verified analysis list to be used for evaluation of e-storybooks. For this purpose, 32 e-storybooks in CD…

  9. The Impact of Gender on Interest in Science Topics and the Choice of Scientific and Technical Vocations

    NASA Astrophysics Data System (ADS)

    Buccheri, Grazia; Abt Gürber, Nadja; Brühwiler, Christian

    2011-01-01

    Many countries belonging to the Organisation for Economic Co-operation and Development (OECD) note a shortage of highly qualified scientific-technical personnel, whereas demand for such employees is growing. Therefore, how to motivate (female) high performers in science or mathematics to pursue scientific careers is of special interest. The sample for this study is taken from the Programme for International Student Assessment (PISA) 2006. It comprises 7,819 high performers either in sciences or mathematics from representative countries of four different education systems which generally performed well or around the OECD average in PISA 2006: Switzerland, Finland, Australia, and Korea. The results give evidence that gender specificity and gender inequity in science education are a cross-national problem. Interests in specific science disciplines only partly support vocational choices in scientific-technical fields. Instead, gender and gender stereotypes play a significant role. Enhancing the utility of a scientific vocational choice is expected to soften the gender impact.

  10. Investigation of the Usability of Computerized Critical Care Information Systems in Germany.

    PubMed

    von Dincklage, Falk; Suchodolski, Klaudiusz; Lichtner, Gregor; Friesdorf, Wolfgang; Podtschaske, Beatrice; Ragaller, Maximilian

    2017-01-01

    The term "usability" describes how effectively, efficiently, and with what level of user satisfaction an information system can be used to accomplish specific goals. Computerized critical care information systems (CCISs) with high usability increase quality of care and staff satisfaction, while reducing medication errors. Conversely, systems lacking usability can interrupt clinical workflow, facilitate errors, and increase charting time. The aim of this study was to investigate and compare usability across CCIS currently used in Germany. In this study, German intensive care unit (ICU) nurses and physicians completed a specialized, previously validated, web-based questionnaire. The questionnaire assessed CCIS usability based on three rating models: an overall rating of the systems, a model rating technical usability, and a model rating task-specific usability. We analyzed results from 535 survey participants and compared eight different CCIS commonly used in Germany. Our results showed that usability strongly differs across the compared systems. The system ICUData had the best overall rating and technical usability, followed by the platforms ICM and MetaVision. The same three systems performed best in the rating of task-specific usability without significant differences between each other. Across all systems, overall ratings were more dependent on ease-of-use aspects than on aspects of utility/functionality, and the general scope of the functions offered was rated better than how well the functions are realized. Our results suggest that manufacturers should shift some of their effort away from the development of new features and focus more on improving the ease-of-use and quality of existing features.

  11. Shuttle GPS R/PA configuration and specification study

    NASA Technical Reports Server (NTRS)

    Booth, R. W. D.

    1979-01-01

    Changes in the technical specifications for a global positioning system (GPS) receiving system dedicated to space shuttle use are presented. Various hardware functions including acquisition, tracking, and measurement are emphasized. The anti-jam performance of the baseline GPS systems are evaluated. Other topics addressed include: the impact on R/PA design of the use of ground based transmitters; problems involved with the use of single channel tests sets; utility of various R/PA antenna interconnections topologies; the choice of the averaging interval for delta range measurements; and the use of interferometry techniques for the computation of orbiter attitude were undertaken.

  12. Action learning across the decades.

    PubMed

    Eason, Ken

    2017-05-02

    Purpose The purpose of this paper is to explore how action learning concepts were used in two healthcare projects undertaken many decades apart. The specific purpose in both cases was to examine how action learning can contribute to shared learning across key stakeholders in a complex socio-technical system. In each case study, action learning supported joint design programmes and the sharing of perspectives about the complex system under investigation. Design/methodology/approach Two action learning projects are described: first, the Hospital Internal Communications (HIC) project led by Reg Revans in the 1960s. Senior staff in ten London hospitals formed action learning teams to address communication issues. Second, in the Better Outcomes for People with Learning Disabilities: Transforming Care (BOLDTC) project, videoconferencing equipment enabled people with learning disabilities to increase their opportunities to communicate. A mutual learning process was established to enable stakeholders to explore the potential of the technical system to improve individual care. Findings The HIC project demonstrated the importance of evidence being shared between team members and that action had to engage the larger healthcare system outside the hospital. The BOLDTC project confirmed the continuing relevance of action learning to healthcare today. Mutual learning was achieved between health and social care specialists and technologists. Originality/value This work draws together the socio-technical systems tradition (considering both social and technical issues in organisations) and action learning to demonstrate that complex systems development needs to be undertaken as a learning process in which action provides the fuel for learning and design.

  13. Crew Transportation Technical Standards and Design Evaluation Criteria

    NASA Technical Reports Server (NTRS)

    Lueders, Kathryn L.; Thomas, Rayelle E. (Compiler)

    2015-01-01

    Crew Transportation Technical Standards and Design Evaluation Criteria contains descriptions of technical, safety, and crew health medical processes and specifications, and the criteria which will be used to evaluate the acceptability of the Commercial Providers' proposed processes and specifications.

  14. Systems Biology Analysis of Heterocellular Signaling.

    PubMed

    Tape, Christopher J

    2016-08-01

    Tissues comprise multiple heterotypic cell types (e.g., epithelial, mesenchymal, and immune cells). Communication between heterotypic cell types is essential for biological cohesion and is frequently dysregulated in disease. Despite the importance of heterocellular communication, most systems biology techniques do not report cell-specific signaling data from mixtures of cells. As a result, our existing perspective of cellular behavior under-represents the influence of heterocellular signaling. Recent technical advances now permit the resolution of systems-level cell-specific signaling data. This review discusses how new physical, spatial, and isotopic resolving methods are facilitating unique systems biology studies of heterocellular communication. Copyright © 2016 Elsevier Ltd. All rights reserved.

  15. International Space Station ECLSS Technical Task Agreement Summary Report

    NASA Technical Reports Server (NTRS)

    Ray, C. D. (Compiler); Salyer, B. H. (Compiler)

    1999-01-01

    This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.

  16. MO-FG-207-03: Maximizing the Utility of Integrated PET/MRI in Clinical Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Behr, S.

    2015-06-15

    The use of integrated PET/MRI systems in clinical applications can best benefit from understanding their technological advances and limitations. The currently available clinical PET/MRI systems have their own characteristics. Thorough analyses of existing technical data and evaluation of necessary performance metrics for quality assurances could be conducted to optimize application-specific PET/MRI protocols. This Symposium will focus on technical advances and limitations of clinical PET/MRI systems, and how this exciting imaging modality can be utilized in applications that can benefit from both PET and MRI. Learning Objectives: To understand the technological advances of clinical PET/MRI systems To correctly identify clinical applicationsmore » that can benefit from PET/MRI To understand ongoing work to further improve the current PET/MRI technology Floris Jansen is a GE Healthcare employee.« less

  17. MO-FG-207-00: Technological Advances in PET/MR Imaging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2015-06-15

    The use of integrated PET/MRI systems in clinical applications can best benefit from understanding their technological advances and limitations. The currently available clinical PET/MRI systems have their own characteristics. Thorough analyses of existing technical data and evaluation of necessary performance metrics for quality assurances could be conducted to optimize application-specific PET/MRI protocols. This Symposium will focus on technical advances and limitations of clinical PET/MRI systems, and how this exciting imaging modality can be utilized in applications that can benefit from both PET and MRI. Learning Objectives: To understand the technological advances of clinical PET/MRI systems To correctly identify clinical applicationsmore » that can benefit from PET/MRI To understand ongoing work to further improve the current PET/MRI technology Floris Jansen is a GE Healthcare employee.« less

  18. 78 FR 3921 - Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... Specifications Combustion Engineering Plants.'' Specifically, the proposed change revises various TSs to add a... Technical Details TSTF-426, Revision 5, is applicable to all Combustion Engineering- designed nuclear power...

  19. Collaborative Point Paper on Active Protection Systems

    DTIC Science & Technology

    2006-10-01

    for the Hunter VHP CIED Program. Also, General Dynamics Armament and Technical Products (GDATP), Burlington, VT is contracted by the Marine Corps...the incoming threat at a relatively long distance. Specific details about the composition and mechanism of this explosive interceptor device are...relatively thin shell of ballistic steel and composite armor, also known as hybrid armor, designed to provide optimal protection from specific threats

  20. The worldwide market for photovoltaics in the rural sector

    NASA Technical Reports Server (NTRS)

    Brainard, W. A.

    1982-01-01

    The worldwide market for stand-alone photovoltaic power systems in three specific segments of the rural sector were determined. The worldwide market for photovoltaic power systems for village power, cottage industry, and agricultural applications were addressed. The objectives of these studies were to: The market potential for small stand-alone photovoltaic power system in specific application areas was assessed. Technical, social and institutional barriers to PV utilization were identified. Funding sources available to potential users was also identified and marketing strategies appropriate for each sector were recommended to PV product manufacturers. The studies were prepared on the basis of data gathered from domestic sources and from field trips to representative countries. Both country-specific and sector-specific results are discussed, and broadly applicable barriers pertinent to international marketing of PV products are presented.

  1. First satellite mobile communication trials using BLQS-CDMA

    NASA Technical Reports Server (NTRS)

    Luzdemateo, Maria; Johns, Simon; Dothey, Michel; Vanhimbeeck, Carl; Deman, Ivan; Wery, Bruno

    1993-01-01

    In this paper, technical results obtained in the first MSBN Land mobile technical trial are reported. MSBN (Mobile Satellite Business Network) is a new program undertaken by the European Space Agency (ESA) to promote mobile satellite communication in Europe, in particular voice capability. The first phase of the MSBN system implementation plan is an experimental phase. Its purpose is to evaluate through field experiments the performance of the MSBN system prior to finalization of its specifications. Particularly, the objective is to verify in the field and possibly improve the performance of the novel satellite access technique BLQS-CDMA (Band Limited Quasi-Synchronous-Code Division Multiple Access), which is proposed as baseline for the MSBN.

  2. Computational models of an inductive power transfer system for electric vehicle battery charge

    NASA Astrophysics Data System (ADS)

    Anele, A. O.; Hamam, Y.; Chassagne, L.; Linares, J.; Alayli, Y.; Djouani, K.

    2015-09-01

    One of the issues to be solved for electric vehicles (EVs) to become a success is the technical solution of its charging system. In this paper, computational models of an inductive power transfer (IPT) system for EV battery charge are presented. Based on the fundamental principles behind IPT systems, 3 kW single phase and 22 kW three phase IPT systems for Renault ZOE are designed in MATLAB/Simulink. The results obtained based on the technical specifications of the lithium-ion battery and charger type of Renault ZOE show that the models are able to provide the total voltage required by the battery. Also, considering the charging time for each IPT model, they are capable of delivering the electricity needed to power the ZOE. In conclusion, this study shows that the designed computational IPT models may be employed as a support structure needed to effectively power any viable EV.

  3. Recommendations for the treatment of aging in standard technical specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orton, R.D.; Allen, R.P.

    1995-09-01

    As part of the US Nuclear Regulatory Commission`s Nuclear Plant Aging Research Program, Pacific Northwest Laboratory (PNL) evaluated the standard technical specifications for nuclear power plants to determine whether the current surveillance requirements (SRs) were effective in detecting age-related degradation. Nuclear Plant Aging Research findings for selected systems and components were reviewed to identify the stressors and operative aging mechanisms and to evaluate the methods available to detect, differentiate, and trend the resulting aging degradation. Current surveillance and testing requirements for these systems and components were reviewed for their effectiveness in detecting degraded conditions and for potential contributions to prematuremore » degradation. When the current surveillance and testing requirements appeared ineffective in detecting aging degradation or potentially could contribute to premature degradation, a possible deficiency in the SRs was identified that could result in undetected degradation. Based on this evaluation, PNL developed recommendations for inspection, surveillance, trending, and condition monitoring methods to be incorporated in the SRs to better detect age- related degradation of these selected systems and components.« less

  4. Electrochemical Membrane for Carbon Dioxide Capture and Power Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghezel-Ayagh, Hossein

    FuelCell Energy, Inc. (FCE), in collaboration with AECOM Corporation (formerly URS Corporation) and Pacific Northwest National Laboratory, has been developing a novel Combined Electric Power and Carbon-dioxide Separation (CEPACS) system. The CEPACS system is based on electrochemical membrane (ECM) technology derived from FCE’s carbonate fuel cell products featuring internal (methane steam) reforming and carrying the trade name of Direct FuelCell®. The unique chemistry of carbonate fuel cells offers an innovative approach for separation of CO 2 from existing fossil-fuel power plant exhaust streams (flue gases). The ECM-based CEPACS system has the potential to become a transformational CO 2-separation technology bymore » working as two devices in one: it separates the CO 2 from the exhaust of other plants such as an existing coal-fired plant and simultaneously produces clean electric power at high efficiency using a supplementary fuel. The development effort was carried out under the U.S. Department of Energy (DOE) cooperative agreement DE-FE0007634. The overall objective of this project was to successfully demonstrate the ability of FCE’s ECM-based CEPACS system technology to separate ≥90% of the CO 2 from a simulated Pulverized Coal (PC) power plant flue gas stream and to compress the captured CO2 to a state that can be easily transported for sequestration or beneficial use. In addition, a key objective was to show, through the technical and economic feasibility study and bench scale testing, that the ECM-based CEPACS system is an economical alternative for CO 2 capture in PC power plants, and that it meets DOE’s objective related to the incremental cost of electricity (COE) for post-combustion CO 2 capture (no more than 35% increase in COE). The project was performed in three budget periods (BP). The specific objective for BP1 was to complete the Preliminary Technical and Economic Feasibility Study. The T&EF study was based on the carbon capture system size suitable for a reference 550 MW PC power plant. The specific objectives for BP2 were to perform (flue gas) contaminant effect evaluation tests, small area membrane tests using clean simulated flue gas, design a flue gas pretreatment system for processing of the gas feed to ECM, update the Technical & Economic Feasibility Study (T&EFS) incorporating results of contaminant effect tests and small area membrane tests, and to prepare a test facility for bench scale testing. The specific objectives for BP3 were to perform bench scale testing (parametric and long-duration testing) of a 11.7 m 2 ECM-based CO 2 capture, purification and compression system, and update (as final) the Technical and Economic Feasibility Study. In addition, an Environmental Health and Safety evaluation (assessment) of the ECM technology was included. This final technical report presents the progress made under the project.« less

  5. Assuring NASA's Safety and Mission Critical Software

    NASA Technical Reports Server (NTRS)

    Deadrick, Wesley

    2015-01-01

    What is IV&V? Independent Verification and Validation (IV&V) is an objective examination of safety and mission critical software processes and products. Independence: 3 Key parameters: Technical Independence; Managerial Independence; Financial Independence. NASA IV&V perspectives: Will the system's software: Do what it is supposed to do?; Not do what it is not supposed to do?; Respond as expected under adverse conditions?. Systems Engineering: Determines if the right system has been built and that it has been built correctly. IV&V Technical Approaches: Aligned with IEEE 1012; Captured in a Catalog of Methods; Spans the full project lifecycle. IV&V Assurance Strategy: The IV&V Project's strategy for providing mission assurance; Assurance Strategy is driven by the specific needs of an individual project; Implemented via an Assurance Design; Communicated via Assurance Statements.

  6. [Digital electroencephalography in brain death diagnostics : Technical requirements and results of a survey on the compatibility with medical guidelines of digital EEG systems from providers in Germany].

    PubMed

    Walter, U; Noachtar, S; Hinrichs, H

    2018-02-01

    The guidelines of the German Medical Association and the German Society for Clinical Neurophysiology and Functional Imaging (DGKN) require a high procedural and technical standard for electroencephalography (EEG) as an ancillary method for diagnosing the irreversible cessation of brain function (brain death). Nowadays, digital EEG systems are increasingly being applied in hospitals. So far it is unclear to what extent the digital EEG systems currently marketed in Germany meet the guidelines for diagnosing brain death. In the present article, the technical und safety-related requirements for digital EEG systems and the EEG documentation for diagnosing brain death are described in detail. On behalf of the DGKN, the authors sent out a questionnaire to all identified distributors of digital EEG systems in Germany with respect to the following technical demands: repeated recording of the calibration signals during an ongoing EEG recording, repeated recording of all electrode impedances during an ongoing EEG recording, assessability of intrasystem noise and galvanic isolation of measurement earthing from earthing conductor (floating input). For 15 of the identified 20 different digital EEG systems the specifications were provided by the distributors (among them all distributors based in Germany). All of these EEG systems are provided with a galvanic isolation (floating input). The internal noise can be tested with all systems; however, some systems do not allow repeated recording of the calibration signals and/or the electrode impedances during an ongoing EEG recording. The majority but not all of the currently available digital EEG systems offered for clinical use are eligible for use in brain death diagnostics as per German guidelines.

  7. Apollo experience report: Television system

    NASA Technical Reports Server (NTRS)

    Coan, P. P.

    1973-01-01

    The progress of the Apollo television systems from the early definition of requirements through the development and inflight use of color television hardware is presented. Television systems that have been used during the Apollo Program are discussed, beginning with a description of the specifications for each system. The document describes the technical approach taken for the development of each system and discusses the prototype and engineering hardware built to test the system itself and to perform the testing to verify compatibility with the spacecraft systems. Problems that occurred during the design and development phase are described. Finally, the flight hardware, operational characteristics, and performance during several Apollo missions are described, and specific recommendations for the remaining Apollo flights and future space missions are made.

  8. End-to-end observatory software modeling using domain specific languages

    NASA Astrophysics Data System (ADS)

    Filgueira, José M.; Bec, Matthieu; Liu, Ning; Peng, Chien; Soto, José

    2014-07-01

    The Giant Magellan Telescope (GMT) is a 25-meter extremely large telescope that is being built by an international consortium of universities and research institutions. Its software and control system is being developed using a set of Domain Specific Languages (DSL) that supports a model driven development methodology integrated with an Agile management process. This approach promotes the use of standardized models that capture the component architecture of the system, that facilitate the construction of technical specifications in a uniform way, that facilitate communication between developers and domain experts and that provide a framework to ensure the successful integration of the software subsystems developed by the GMT partner institutions.

  9. Conceptual design and issues of the laser inertial fusion test (LIFT) reactor—targets and chamber systems

    NASA Astrophysics Data System (ADS)

    Norimatsu, T.; Kozaki, Y.; Shiraga, H.; Fujita, H.; Okano, K.; Members of LIFT Design Team

    2017-11-01

    We present the conceptual design of an experimental laser fusion plant known as the laser inertial fusion test (LIFT) reactor. The conceptual design aims at technically connecting a single-shot experiment and a commercial power plant. The LIFT reactor is designed on a three-phase scheme, where each phase has specific goals and the dedicated chambers of each phase are driven by the same laser. Technical issues related to the chamber technology including radiation safety to repeat burst mode operation are discussed in this paper.

  10. 77 FR 8288 - Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... not listed on the Web site, but should note that the NRC's E-Filing system does not support unlisted... (COLR), to update the methodology reference list to support the core design with the new AREVA fuel... methodologies listed in Technical Specification 5.7.1.5 has no impact on any plant configuration or system...

  11. An Introduction to the NCHEMS Costing and Data Management System. Technical Report No. 55.

    ERIC Educational Resources Information Center

    Haight, Mike; Martin, Ron

    The NCHEMS Costing and Data Management System is designed to assist institutions in the implementation of cost studies. There are at least two kinds of cost studies: historical cost studies which display cost-related data that reflect actual events over a specific prior time period, and predictive cost studies which forecast costs that will be…

  12. The Advantages of Abstract Control Knowledge in Expert System Design. Technical Report #7.

    ERIC Educational Resources Information Center

    Clancey, William J.

    This paper argues that an important design principle for building expert systems is to represent all control knowledge abstractly and separately from the domain knowledge upon which it operates. Abstract control knowledge is defined as the specifications of when and how a program is to carry out its operations, such as pursuing a goal, focusing,…

  13. The Development of a Token Reinforcement System for a Specific Lesson. Technical Report #11.

    ERIC Educational Resources Information Center

    Au, Kathryn

    This paper presents a brief description of a token reinforcement system developed for a kindergarten language class in the Kamehameha Early Education Program (KEEP). Visual reinforcers (colored plastic tabs) were placed next to the names of individual children (each time they made a correct response) on a large chart in the front of the room. Five…

  14. Technical-Information Products for a National Volcano Early Warning System

    USGS Publications Warehouse

    Guffanti, Marianne; Brantley, Steven R.; Cervelli, Peter F.; Nye, Christopher J.; Serafino, George N.; Siebert, Lee; Venezky, Dina Y.; Wald, Lisa

    2007-01-01

    Introduction Technical outreach - distinct from general-interest and K-12 educational outreach - for volcanic hazards is aimed at providing usable scientific information about potential or ongoing volcanic activity to public officials, businesses, and individuals in support of their response, preparedness, and mitigation efforts. Within the context of a National Volcano Early Warning System (NVEWS) (Ewert et al., 2005), technical outreach is a critical process, transferring the benefits of enhanced monitoring and hazards research to key constituents who have to initiate actions or make policy decisions to lessen the hazardous impact of volcanic activity. This report discusses recommendations of the Technical-Information Products Working Group convened in 2006 as part of the NVEWS planning process. The basic charge to the Working Group was to identify a web-based, volcanological 'product line' for NVEWS to meet the specific hazard-information needs of technical users. Members of the Working Group were: *Marianne Guffanti (Chair), USGS, Reston VA *Steve Brantley, USGS, Hawaiian Volcano Observatory HI *Peter Cervelli, USGS, Alaska Volcano Observatory, Anchorage AK *Chris Nye, Division of Geological and Geophysical Surveys and Alaska Volcano Observatory, Fairbanks AK *George Serafino, National Oceanic and Atmospheric Administration, Camp Springs MD *Lee Siebert, Smithsonian Institution, Washington DC *Dina Venezky, USGS, Volcano Hazards Team, Menlo Park CA *Lisa Wald, USGS, Earthquake Hazards Program, Golden CO

  15. Comparing Supply-Side Specifications in Models of Global Agriculture and the Food System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, Sherman; van Meijl, Hans; Willenbockel, Dirk

    This paper compares the theoretical specification of production and technical change across the partial equilibrium (PE) and computable general equilibrium (CGE) models of the global agricultural and food system included in the AgMIP model comparison study. The two modeling approaches have different theoretical underpinnings concerning the scope of economic activity they capture and how they represent technology and the behavior of supply and demand in markets. This paper focuses on their different specifications of technology and supply behavior, comparing their theoretical and empirical treatments. While the models differ widely in their specifications of technology, both within and between the PEmore » and CGE classes of models, we find that the theoretical responsiveness of supply to changes in prices can be similar, depending on parameter choices that define the behavior of supply functions over the domain of applicability defined by the common scenarios used in the AgMIP comparisons. In particular, we compare the theoretical specification of supply in CGE models with neoclassical production functions and PE models that focus on land and crop yields in agriculture. In practice, however, comparability of results given parameter choices is an empirical question, and the models differ in their sensitivity to variations in specification. To illustrate the issues, sensitivity analysis is done with one global CGE model, MAGNET, to indicate how the results vary with different specification of technical change, and how they compare with the results from PE models.« less

  16. TU-G-201-01: What Therapy Physicists Need to Know About CT and PET/CT: Terminology and Latest Developments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hua, C.

    This session will update therapeutic physicists on technological advancements and radiation oncology features of commercial CT, MRI, and PET/CT imaging systems. Also described are physicists’ roles in every stage of equipment selection, purchasing, and operation, including defining specifications, evaluating vendors, making recommendations, and optimal and safe use of imaging equipment in radiation oncology environment. The first presentation defines important terminology of CT and PET/CT followed by a review of latest innovations, such as metal artifact reduction, statistical iterative reconstruction, radiation dose management, tissue classification by dual energy CT and spectral CT, improvement in spatial resolution and sensitivity in PET, andmore » potentials of PET/MR. We will also discuss important technical specifications and items in CT and PET/CT purchasing quotes and their impacts. The second presentation will focus on key components in the request for proposal for a MRI simulator and how to evaluate vendor proposals. MRI safety issues in radiation Oncology, including MRI scanner Zones (4-zone design), will be discussed. Basic MR terminologies, important functionalities, and advanced features, which are relevant to radiation therapy, will be discussed. In the third presentation, justification of imaging systems for radiation oncology, considerations in room design and construction in a RO department, shared use with diagnostic radiology, staffing needs and training, clinical/research use cases and implementation, will be discussed. The emphasis will be on understanding and bridging the differences between diagnostic and radiation oncology installations, building consensus amongst stakeholders for purchase and use, and integrating imaging technologies into the radiation oncology environment. Learning Objectives: Learn the latest innovations of major imaging systems relevant to radiation therapy Be able to describe important technical specifications of CT, MRI, and PET/CT Understand the process of budget request, equipment justification, comparisons of technical specifications, site visits, vendor selection, and contract development.« less

  17. TU-G-201-02: An MRI Simulator From Proposal to Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cao, Y.

    2015-06-15

    This session will update therapeutic physicists on technological advancements and radiation oncology features of commercial CT, MRI, and PET/CT imaging systems. Also described are physicists’ roles in every stage of equipment selection, purchasing, and operation, including defining specifications, evaluating vendors, making recommendations, and optimal and safe use of imaging equipment in radiation oncology environment. The first presentation defines important terminology of CT and PET/CT followed by a review of latest innovations, such as metal artifact reduction, statistical iterative reconstruction, radiation dose management, tissue classification by dual energy CT and spectral CT, improvement in spatial resolution and sensitivity in PET, andmore » potentials of PET/MR. We will also discuss important technical specifications and items in CT and PET/CT purchasing quotes and their impacts. The second presentation will focus on key components in the request for proposal for a MRI simulator and how to evaluate vendor proposals. MRI safety issues in radiation Oncology, including MRI scanner Zones (4-zone design), will be discussed. Basic MR terminologies, important functionalities, and advanced features, which are relevant to radiation therapy, will be discussed. In the third presentation, justification of imaging systems for radiation oncology, considerations in room design and construction in a RO department, shared use with diagnostic radiology, staffing needs and training, clinical/research use cases and implementation, will be discussed. The emphasis will be on understanding and bridging the differences between diagnostic and radiation oncology installations, building consensus amongst stakeholders for purchase and use, and integrating imaging technologies into the radiation oncology environment. Learning Objectives: Learn the latest innovations of major imaging systems relevant to radiation therapy Be able to describe important technical specifications of CT, MRI, and PET/CT Understand the process of budget request, equipment justification, comparisons of technical specifications, site visits, vendor selection, and contract development.« less

  18. Development Specification for the Feedwater Supply Assembly (FSA), FSA-431 with Integrated Auxiliary Feedwater Supply Assembly (AFSA), FSA-531

    NASA Technical Reports Server (NTRS)

    Anchondo, Ian; Campbell, Colin

    2017-01-01

    The FSA with Integrated Aux FSA Specification establishes the requirements for design, performance, and testing of the FSA-431/FSA-531 assembly in compliance with CTSD-ADV-780, Development Specification for the Advanced EMU (AEMU) Portable Life Support System (PLSS). This section contains the technical design and performance requirements for the integrated assembly of the Feedwater Supply Assembly and Auxiliary Feedwater Supply Assembly for the Advanced EVA Development Portable Life Support Subsystem (PLSS).

  19. Neil Snyder | NREL

    Science.gov Websites

    Photo of Neil Snyder Neil Snyder Manager III-Program Management Research Neil.Snyder@nrel.gov management. He has chiefly focused on developing complex systems and his specific expertise is leadership. As has acquired familiarity level expertise in many technical fields including environmental management

  20. An International Aerospace Information System: A Cooperative Opportunity.

    ERIC Educational Resources Information Center

    Blados, Walter R.; Cotter, Gladys A.

    1992-01-01

    Introduces and discusses ideas and issues relevant to the international unification of scientific and technical information (STI) through development of an international aerospace database (IAD). Specific recommendations for improving the National Aeronautics and Space Administration Aerospace Database (NAD) and for implementing IAD are given.…

  1. Apprenticeship: Past and Present

    ERIC Educational Resources Information Center

    La Luz, 1977

    1977-01-01

    Rapid changes in our industrial system require a large body of skilled workers who are able to carry out technical specifications and who can supervise less skilled members of the work force. This article discusses modern apprenticeship programs, certificates of completion, joint apprenticeship committees, basic standards for apprenticeship, and…

  2. Energy utilization: municipal waste incineration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaBeck, M.F.

    An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less

  3. Open Mobile Alliance Secure Content Exchange: Introducing Key Management Constructs and Protocols for Compromise-Resilient Easing of DRM Restrictions

    NASA Astrophysics Data System (ADS)

    Kravitz, David William

    This paper presents an insider's view of the rationale and the cryptographic mechanics of some principal elements of the Open Mobile Alliance (OMA) Secure Content Exchange (SCE) Technical Specifications. A primary goal is to enable implementation of a configurable methodology that quarantines the effects that unknown-compromised entities have on still-compliant entities in the system, while allowing import from upstream protection systems and multi-client reuse of Rights Objects that grant access to plaintext content. This has to be done without breaking compatibility with the underlying legacy OMA DRM v2.0/v2.1 Technical Specifications. It is also required that legacy devices can take at least partial advantage of the new import functionality, and can request the creation of SCE-compatible Rights Objects and utilize Rights Objects created upon request of SCE-conformant devices. This must be done in a way that the roles played by newly defined entities unrecognizable by legacy devices remain hidden.

  4. A Logical Process Calculus

    NASA Technical Reports Server (NTRS)

    Cleaveland, Rance; Luettgen, Gerald; Bushnell, Dennis M. (Technical Monitor)

    2002-01-01

    This paper presents the Logical Process Calculus (LPC), a formalism that supports heterogeneous system specifications containing both operational and declarative subspecifications. Syntactically, LPC extends Milner's Calculus of Communicating Systems with operators from the alternation-free linear-time mu-calculus (LT(mu)). Semantically, LPC is equipped with a behavioral preorder that generalizes Hennessy's and DeNicola's must-testing preorder as well as LT(mu's) satisfaction relation, while being compositional for all LPC operators. From a technical point of view, the new calculus is distinguished by the inclusion of: (1) both minimal and maximal fixed-point operators and (2) an unimple-mentability predicate on process terms, which tags inconsistent specifications. The utility of LPC is demonstrated by means of an example highlighting the benefits of heterogeneous system specification.

  5. 76 FR 54510 - Notice of Availability of Proposed Models for Plant-Specific Adoption of Technical Specifications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2... Specifications Task Force (TSTF) Traveler TSTF- 500, Revision 2, ``DC Electrical Rewrite--Update to TSTF-360....8.6, ``Battery Cell Parameters.'' Additionally, a new Administrative Controls program, titled...

  6. CAD/CAM data management needs, requirements and options

    NASA Technical Reports Server (NTRS)

    Lopatka, R. S.; Johnson, T. G.

    1978-01-01

    The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.

  7. Market assessment of photovoltaic power systems for agricultural applications in Nigeria

    NASA Technical Reports Server (NTRS)

    Staples, D.; Steingass, H.; Nolfi, J.

    1981-01-01

    The market potential for stand-alone photovoltaic systems in agriculture was studied. Information is presented on technical and economically feasible applications, and assessments of the business, government and financial climate for photovoltaic sales. It is concluded that the market for stand-alone systems will be large because of the availability of captial and the high premium placed on high reliability, low maintenance power systems. Various specific applications are described, mostly related to agriculture.

  8. Market assessment of photovoltaic power systems for agricultural applications in Nigeria

    NASA Astrophysics Data System (ADS)

    Staples, D.; Steingass, H.; Nolfi, J.

    1981-10-01

    The market potential for stand-alone photovoltaic systems in agriculture was studied. Information is presented on technical and economically feasible applications, and assessments of the business, government and financial climate for photovoltaic sales. It is concluded that the market for stand-alone systems will be large because of the availability of captial and the high premium placed on high reliability, low maintenance power systems. Various specific applications are described, mostly related to agriculture.

  9. MO-FG-207-01: Technological Advances and Challenges: Experience with the First Integrated Whole-Body PET/MRI

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laforest, R.

    2015-06-15

    The use of integrated PET/MRI systems in clinical applications can best benefit from understanding their technological advances and limitations. The currently available clinical PET/MRI systems have their own characteristics. Thorough analyses of existing technical data and evaluation of necessary performance metrics for quality assurances could be conducted to optimize application-specific PET/MRI protocols. This Symposium will focus on technical advances and limitations of clinical PET/MRI systems, and how this exciting imaging modality can be utilized in applications that can benefit from both PET and MRI. Learning Objectives: To understand the technological advances of clinical PET/MRI systems To correctly identify clinical applicationsmore » that can benefit from PET/MRI To understand ongoing work to further improve the current PET/MRI technology Floris Jansen is a GE Healthcare employee.« less

  10. Research safety vehicle program (Phase II) specification review. Volume II. Final technical report, Jul 1975--Nov 1976

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pugliese, S.M.

    1977-02-01

    In Phase I of the Research Safety Vehicle Program (RSV), preliminary design and performance specifications were developed for a mid-1980's vehicle that integrates crashworthiness and occupant safety features with material resource conservation, economy, and producibility. Phase II of the program focused on development of the total vehicle design via systems engineering and integration analyses. As part of this effort, it was necessary to continuously review the Phase I recommended performance specification in relation to ongoing design/test activities. This document contains the results of analyses of the Phase I specifications. The RSV is expected to satisfy all of the producibility andmore » safety related specifications, i.e., handling and stability systems, crashworthiness, occupant protection, pedestrian/cyclist protection, etc.« less

  11. Technical Support Document for Version 3.6.1 of the COMcheck Software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartlett, Rosemarie; Connell, Linda M.; Gowri, Krishnan

    2009-09-29

    This technical support document (TSD) is designed to explain the technical basis for the COMcheck software as originally developed based on the ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989). Documentation for other national model codes and standards and specific state energy codes supported in COMcheck has been added to this report as appendices. These appendices are intended to provide technical documentation for features specific to the supported codes and for any changes made for state-specific codes that differ from the standard features that support compliance with the national model codes and standards.

  12. Technical specification for vacuum systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khaw, J.

    The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10/sup -5/ to 10/sup -11/ Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing andmore » designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components. (LEW)« less

  13. Web-based, mobile-device friendly, self-report survey system incorporating avatars and gaming console techniques.

    PubMed

    Savel, Craig; Mierzwa, Stan; Gorbach, Pamina; Lally, Michelle; Zimet, Gregory; Meyer, Kristin; Souidi, Samir; Interventions, Aids

    2014-01-01

    We describe building an avatar-based self-report data collection tool to be used for a specific HIV prevention research project that is evaluating the feasibility and acceptability of this novel approach to collect self-reported data among youth. We discuss the gathering of requirements, the process of building a prototype of the envisioned system, and the lessons learned during the development of the solution. Specific knowledge is shared regarding technical experience with software development technologies and possible avenues for changes that could be considered if such a self-report survey system is used again. Examples of other gaming and avatar technology systems are included to provide further background.

  14. Web-based, mobile-device friendly, self-report survey system incorporating avatars and gaming console techniques

    PubMed Central

    Savel, Craig; Mierzwa, Stan; Gorbach, Pamina; Lally, Michelle; Zimet, Gregory; Meyer, Kristin; Souidi, Samir; Interventions, AIDS

    2014-01-01

    We describe building an avatar-based self-report data collection tool to be used for a specific HIV prevention research project that is evaluating the feasibility and acceptability of this novel approach to collect self-reported data among youth. We discuss the gathering of requirements, the process of building a prototype of the envisioned system, and the lessons learned during the development of the solution. Specific knowledge is shared regarding technical experience with software development technologies and possible avenues for changes that could be considered if such a self-report survey system is used again. Examples of other gaming and avatar technology systems are included to provide further background. PMID:25422726

  15. Creating and parameterizing patient-specific deep brain stimulation pathway-activation models using the hyperdirect pathway as an example

    PubMed Central

    Gunalan, Kabilar; Chaturvedi, Ashutosh; Howell, Bryan; Duchin, Yuval; Lempka, Scott F.; Patriat, Remi; Sapiro, Guillermo; Harel, Noam; McIntyre, Cameron C.

    2017-01-01

    Background Deep brain stimulation (DBS) is an established clinical therapy and computational models have played an important role in advancing the technology. Patient-specific DBS models are now common tools in both academic and industrial research, as well as clinical software systems. However, the exact methodology for creating patient-specific DBS models can vary substantially and important technical details are often missing from published reports. Objective Provide a detailed description of the assembly workflow and parameterization of a patient-specific DBS pathway-activation model (PAM) and predict the response of the hyperdirect pathway to clinical stimulation. Methods Integration of multiple software tools (e.g. COMSOL, MATLAB, FSL, NEURON, Python) enables the creation and visualization of a DBS PAM. An example DBS PAM was developed using 7T magnetic resonance imaging data from a single unilaterally implanted patient with Parkinson’s disease (PD). This detailed description implements our best computational practices and most elaborate parameterization steps, as defined from over a decade of technical evolution. Results Pathway recruitment curves and strength-duration relationships highlight the non-linear response of axons to changes in the DBS parameter settings. Conclusion Parameterization of patient-specific DBS models can be highly detailed and constrained, thereby providing confidence in the simulation predictions, but at the expense of time demanding technical implementation steps. DBS PAMs represent new tools for investigating possible correlations between brain pathway activation patterns and clinical symptom modulation. PMID:28441410

  16. Technical publication transfer test with McDonnell Aircraft Company: MIL-M-28001 (SGML) and MIL-D-28000 Class 1 (IGES)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-06-25

    The CALS Test Network (CTN) conducted a CTN Planned Test (CPT) of several CALS standards related to the transfer of technical publication data: MIL-STD-1840A (1840A), MIL-D-28000 Class I (28000), MIL-M-28001 (28001), and MIL-D-28003 (28003). The test was conducted with the McDonnell Aircraft Company (CMAIR) of St. Louis, Missouri in accordance with part one of CTN Test Plan CTN89-TM-06 and using material from an F-15E technical manual. One focus of the test was the transfer of a moderately large volume of technical publication data. There were 9 text files, 74 Initial Graphics Exchange Specification (IGES) files, and 74 Computer Graphics Metafilemore » (CGM) files in the exchange package. A noteworthy feature of the test was its early attempt to exchange CGM data. Part one of CTN89-TM-06 called for technical publication data to be output from MCAIR's Xyvision system on 9-track magnetic tape. The data was to be in accordance with the 28001 subset of the Standard Generalized Mark-up Language (SGML) and the 28001 Document Type Definition (DTD) that conformed to MIL-M-38784B, the general style and format requirements for technical manuals. Technical illustrations in the manual were to be done in accordance with 28000 Class I (IGES) and 28003 (CGM). Part two of the test called for the test tape to be read into another technical publication system where the text would be modified and the vector illustrations would all be converted to raster, in accordance with MIL-R-28002. This part of the test is not covered in this report.« less

  17. Controller's role in monitoring prospective payment system.

    PubMed

    Margrif, F D

    1986-05-01

    The challenge for hospital controllers in overseeing the prospective payment system (PPS) lies not in acquiring technical expertise but in working with the chief executive officer to coordinate organizational change. Specifically, the controller should assist in creating a prospective payment committee (PPC)--an interdisciplinary group of executives, middle managers, and medical staff. The PPC's duties, among others, include educating staff about the PPS, development of a productivity reporting system, and review of the responsibility accounting structure.

  18. Tester Independent Support Software System (TISSS)

    DTIC Science & Technology

    1991-08-01

    AD-A240 668 RL-TR-91-163 Final Technical Report August 1991 TESTER INDEPENDENT SUPPORT SOFTWARE SYSTEM (TISSS) Harris Corporation Dr. Robert Rolfe...Laboratory Air Force Systems Command Griffiss Air Force Base, NY 13441-5700 9_1 9 17 o15 This report has been reviewed by the Rome Laboratory Public...will assist us in maintaining a current mailing list. Do not return copies of this report unless contractual obligations or notices on a specific

  19. The Environmental Qualification Specification as a Technical Management Tool,

    DTIC Science & Technology

    1981-11-01

    CommuentI The dwell test for fatigue of the isolation system in a container is intended to be an accelerated test, in order to save test time and...diagnostic purposes * Response computation is not the only possible design approach. In the development of control system or servomechanism theory , emphasis...seldom aborts a mission in the same way as a complete failure of any function, and properly influences system effectiveness through a different type of

  20. Astronomic Telescope Facility: Preliminary systems definition study report. Volume 2: Technical description

    NASA Technical Reports Server (NTRS)

    Sobeck, Charlie (Editor)

    1987-01-01

    The Astrometric Telescope Facility (AFT) is to be an earth-orbiting facility designed specifically to measure the change in relative position of stars. The primary science investigation for the facility will be the search for planets and planetary systems outside the solar system. In addition the facility will support astrophysics investigations dealing with the location or motions of stars. The science objective and facility capabilities for astrophysics investigations are discussed.

  1. The evaluator as technical assistant: A model for systemic reform support

    NASA Astrophysics Data System (ADS)

    Century, Jeanne Rose

    This study explored evaluation of systemic reform. Specifically, it focused on the evaluation of a systemic effort to improve K-8 science, mathematics and technology education. The evaluation was of particular interest because it used both technical assistance and evaluation strategies. Through studying the combination of these roles, this investigation set out to increase understanding of potentially new evaluator roles, distinguish important characteristics of the evaluator/project participant relationship, and identify how these roles and characteristics contribute to effective evaluation of systemic science education reform. This qualitative study used interview, document analysis, and participant observation as methods of data collection. Interviews were conducted with project leaders, project participants, and evaluators and focused on the evaluation strategies and process, the use of the evaluation, and technical assistance. Documents analyzed included transcripts of evaluation team meetings and reports, memoranda and other print materials generated by the project leaders and the evaluators. Data analysis consisted of analytic and interpretive procedures consistent with the qualitative data collected and entailed a combined process of coding transcripts of interviews and meetings, field notes, and other documents; analyzing and organizing findings; writing of reflective and analytic memos; and designing and diagramming conceptual relationships. The data analysis resulted in the development of the Multi-Function Model for Systemic Reform Support. This model organizes systemic reform support into three functions: evaluation, technical assistance, and a third, named here as "systemic perspective." These functions work together to support the project's educational goals as well as a larger goal--building capacity in project participants. This model can now serve as an informed starting point or "blueprint" for strategically supporting systemic reform.

  2. ASBO's Certificate of Excellence in Financial Reporting by School Systems.

    ERIC Educational Resources Information Center

    Gatti, Bernard F.

    1989-01-01

    The Certificate of Excellence in Financial Reporting by Schools Program reached a high of 180 submissions for program year 1989. Describes technical developments, including a 90-minute videotape about the program, highlights of the previous year, and a summary of certain program specifics. (MLF)

  3. Embedded Literacy: Knowledge as Meaning

    ERIC Educational Resources Information Center

    Martin, J. R.

    2013-01-01

    This paper takes as point of departure the register variable field, and explores its application to the discourse of History and Biology in secondary school classrooms from the perspective of systemic functional linguistics. In particular it considers the functions of technicality and abstraction in these subject specific discourses, and their…

  4. Optimizing the analysis of routing oversize/overweight loads to provide efficient freight corridors : technical summary.

    DOT National Transportation Integrated Search

    2012-07-01

    The subject of this report is limited specifically to Kansas highways. Current features of the State Highway System were looked at to determine corridors that do not limit Oversize/Overweight (OS/OW) vehicles, or that limit loads to varying degree...

  5. Technical and management information system: The tool for professional productivity on the space station program

    NASA Technical Reports Server (NTRS)

    Montoya, G.; Boldon, P.

    1985-01-01

    The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.

  6. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, Joseph William; Harris, Aaron P.

    2013-01-01

    A barge-mounted hydrogen-fueled proton exchange membrane (PEM) fuel cell system has the potential to reduce emissions and fossil fuel use of maritime vessels in and around ports. This study determines the technical feasibility of this concept and examines specific options on the U.S. West Coast for deployment practicality and potential for commercialization.The conceptual design of the system is found to be straightforward and technically feasible in several configurations corresponding to various power levels and run times.The most technically viable and commercially attractive deployment options were found to be powering container ships at berth at the Port of Tacoma and/or Seattle,more » powering tugs at anchorage near the Port of Oakland, and powering refrigerated containers on-board Hawaiian inter-island transport barges. Other attractive demonstration options were found at the Port of Seattle, the Suisun Bay Reserve Fleet, the California Maritime Academy, and an excursion vessel on the Ohio River.« less

  7. Editing Tips for Technical Publications in the Joint Nuclear Weapons Publication System (JNWPS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ALLEN, TARA S.

    2002-12-01

    These editing tips contain helpful suggestions to assist writers who are writing, editing, and publishing technical publications in the JNWPS. The suggestions clarify some of the most common writing problems and requirements of two publications used in the JNWPS: ''DOE-DTRA TP 1-1, Joint Nuclear Weapons Publications System Operating Procedures, Specifications, and Standards, and United States Government Printing Office Style Manual''. Topics include requirements for abbreviations, formats for drafts, layouts of illustrations and tables, appropriate wording for interim changes, guidance for creating a list of effective pages, how to insert and delete pages and paragraphs, referencing other technical publications, use ofmore » revision bars, requirements for safety precautions, use of hyphens, and how to place warnings, cautions, and notes. Also included are a writer's checklist, samples of draft title pages, and a section of helpful tips for the writers who use the department's desktop publishing software program, Adobe{reg_sign} FrameMaker{reg_sign}.« less

  8. Fundamental Aeronautics Program: Overview of Propulsion Work in the Supersonic Cruise Efficiency Technical Challenge

    NASA Technical Reports Server (NTRS)

    Castner, Ray

    2012-01-01

    The Supersonics Project, part of NASA's Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2012) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  9. Web-based software tool for constraint-based design specification of synthetic biological systems.

    PubMed

    Oberortner, Ernst; Densmore, Douglas

    2015-06-19

    miniEugene provides computational support for solving combinatorial design problems, enabling users to specify and enumerate designs for novel biological systems based on sets of biological constraints. This technical note presents a brief tutorial for biologists and software engineers in the field of synthetic biology on how to use miniEugene. After reading this technical note, users should know which biological constraints are available in miniEugene, understand the syntax and semantics of these constraints, and be able to follow a step-by-step guide to specify the design of a classical synthetic biological system-the genetic toggle switch.1 We also provide links and references to more information on the miniEugene web application and the integration of the miniEugene software library into sophisticated Computer-Aided Design (CAD) tools for synthetic biology ( www.eugenecad.org ).

  10. ASAC Executive Assistant Architecture Description Summary

    NASA Technical Reports Server (NTRS)

    Roberts, Eileen; Villani, James A.

    1997-01-01

    In this technical document, we describe the system architecture developed for the Aviation System Analysis Capability (ASAC) Executive Assistant (EA). We describe the genesis and role of the ASAC system, discuss the objectives of the ASAC system and provide an overview of components and models within the ASAC system, discuss our choice for an architecture methodology, the Domain Specific Software Architecture (DSSA), and the DSSA approach to developing a system architecture, and describe the development process and the results of the ASAC EA system architecture. The document has six appendices.

  11. Formal Methods Specification and Verification Guidebook for Software and Computer Systems. Volume 1; Planning and Technology Insertion

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The Formal Methods Specification and Verification Guidebook for Software and Computer Systems describes a set of techniques called Formal Methods (FM), and outlines their use in the specification and verification of computer systems and software. Development of increasingly complex systems has created a need for improved specification and verification techniques. NASA's Safety and Mission Quality Office has supported the investigation of techniques such as FM, which are now an accepted method for enhancing the quality of aerospace applications. The guidebook provides information for managers and practitioners who are interested in integrating FM into an existing systems development process. Information includes technical and administrative considerations that must be addressed when establishing the use of FM on a specific project. The guidebook is intended to aid decision makers in the successful application of FM to the development of high-quality systems at reasonable cost. This is the first volume of a planned two-volume set. The current volume focuses on administrative and planning considerations for the successful application of FM.

  12. SSME propellant path leak detection real-time

    NASA Technical Reports Server (NTRS)

    Crawford, R. A.; Smith, L. M.

    1994-01-01

    Included are four documents that outline the technical aspects of the research performed on NASA Grant NAG8-140: 'A System for Sequential Step Detection with Application to Video Image Processing'; 'Leak Detection from the SSME Using Sequential Image Processing'; 'Digital Image Processor Specifications for Real-Time SSME Leak Detection'; and 'A Color Change Detection System for Video Signals with Applications to Spectral Analysis of Rocket Engine Plumes'.

  13. Technical Assistance to Developers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rockward, Tommy; Borup, Rodney L.; Garzon, Fernando H.

    2012-07-17

    This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols,more » and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.« less

  14. Devising a consensus definition and framework for non-technical skills in healthcare to support educational design: A modified Delphi study.

    PubMed

    Gordon, Morris; Baker, Paul; Catchpole, Ken; Darbyshire, Daniel; Schocken, Dawn

    2015-01-01

    Non-technical skills are a subset of human factors that focus on the individual and promote safety through teamwork and awareness. There is no widely adopted competency- or outcome-based framework for non-technical skills training in healthcare. The authors set out to devise such a framework using a modified Delphi approach. An exhaustive list of published and team suggested items was presented to the expert panel for ranking and to propose a definition. In the second round, a focused list was presented, as well as the proposed definition elements. The finalised framework was sent to the panel for review. Sixteen experts participated. The final framework consists of 16 competencies for all and eight specific competencies for team leaders. The consensus definition describes non-technical skills as "a set of social (communication and team work) and cognitive (analytical and personal behaviour) skills that support high quality, safe, effective and efficient inter-professional care within the complex healthcare system". The authors have produced a new competency framework, through the works of an International expert panel, which is not discipline specific that can be used by curriculum developers, educational innovators and clinical teachers to support developments in the field.

  15. 76 FR 66763 - Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-510...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... of Technical Specifications Task Force Traveler TSTF-510, Revision 2, ``Revision to Steam Generator..., Revision 2, ``Revision to Steam Generator [(SG)] Program Inspection Frequencies and Tube Sample Selection..., ``Steam Generator (SG) Program,'' Specification 5.6.7, ``Steam Generator Tube Inspection Report,'' and the...

  16. Software Dependability and Safety Evaluations ESA's Initiative

    NASA Astrophysics Data System (ADS)

    Hernek, M.

    ESA has allocated funds for an initiative to evaluate Dependability and Safety methods of Software. The objectives of this initiative are; · More extensive validation of Safety and Dependability techniques for Software · Provide valuable results to improve the quality of the Software thus promoting the application of Dependability and Safety methods and techniques. ESA space systems are being developed according to defined PA requirement specifications. These requirements may be implemented through various design concepts, e.g. redundancy, diversity etc. varying from project to project. Analysis methods (FMECA. FTA, HA, etc) are frequently used during requirements analysis and design activities to assure the correct implementation of system PA requirements. The criticality level of failures, functions and systems is determined and by doing that the critical sub-systems are identified, on which dependability and safety techniques are to be applied during development. Proper performance of the software development requires the development of a technical specification for the products at the beginning of the life cycle. Such technical specification comprises both functional and non-functional requirements. These non-functional requirements address characteristics of the product such as quality, dependability, safety and maintainability. Software in space systems is more and more used in critical functions. Also the trend towards more frequent use of COTS and reusable components pose new difficulties in terms of assuring reliable and safe systems. Because of this, its dependability and safety must be carefully analysed. ESA identified and documented techniques, methods and procedures to ensure that software dependability and safety requirements are specified and taken into account during the design and development of a software system and to verify/validate that the implemented software systems comply with these requirements [R1].

  17. European Workshop Industrical Computer Science Systems approach to design for safety

    NASA Technical Reports Server (NTRS)

    Zalewski, Janusz

    1992-01-01

    This paper presents guidelines on designing systems for safety, developed by the Technical Committee 7 on Reliability and Safety of the European Workshop on Industrial Computer Systems. The focus is on complementing the traditional development process by adding the following four steps: (1) overall safety analysis; (2) analysis of the functional specifications; (3) designing for safety; (4) validation of design. Quantitative assessment of safety is possible by means of a modular questionnaire covering various aspects of the major stages of system development.

  18. Using Niche-Market Magazines to Teach Audience

    ERIC Educational Resources Information Center

    Tichenor, Stuart

    2006-01-01

    In technical writing classes, audience is one of the most important concepts. Technical writing is typically written to a specific audience for a specific purpose. In addition, as audiences change, so must the way a document is written. An audience's lack of knowledge in a technical area, for example, would require more background information or…

  19. The interactive systems framework applied to the strategic prevention framework: the Rhode Island experience.

    PubMed

    Florin, Paul; Friend, Karen B; Buka, Stephen; Egan, Crystelle; Barovier, Linda; Amodei, Brenda

    2012-12-01

    The Interactive Systems Framework for Dissemination and Implementation (ISF) was introduced as a heuristic systems level model to help bridge the gap between research and practice (Wandersman et al., in Am J Commun Psychol 41:171-181, 2008). This model describes three interacting systems with distinct functions that (1) distill knowledge to develop innovations; (2) provide supportive training and technical assistance for dissemination to; (3) a prevention delivery system responsible for implementation in the field. The Strategic Prevention Framework (SPF) is a major prevention innovation launched by the Center for Substance Abuse Prevention (CSAP) of the Substance Abuse and Mental Health Services Administration (SAMHSA). The SPF offers a structured, sequential, data-driven approach that explicitly targets environmental conditions in the community and aims for change in substance use and problems at the population level. This paper describes how the ISF was applied to the challenges of implementing the SPF in 14 Rhode Island communities, with a focus on the development of a new Training and Technical Assistance Resources Center to support SPF efforts. More specifically, we (1) describe each of the three ISF interacting systems as they evolved in Rhode Island; (2) articulate the lines of communication between the three systems; and (3) examine selected evaluation data to understand relationships between training and technical assistance and SPF implementation and outcomes.

  20. Training and the Change Agent Role Model

    ERIC Educational Resources Information Center

    Leach, Wesley B.; Owens, Vyrle W.

    1973-01-01

    The authors discuss the qualities possessed by a model change agent and roles played by him as resident technical participant: analyst, advisor, advocate, systems linker, innovator, and trainer. Besides presenting the teaching plan for change agents, the authors call upon their Peace Corps experiences to provide specific examples of what is…

  1. Sixteenth NASTRAN (R) Users' Colloquium

    NASA Technical Reports Server (NTRS)

    1988-01-01

    These are the proceedings of the Sixteenth NASTRAN Users' Colloquium held in Arlington, Virginia from 25 to 29 April, 1988. Technical papers contributed by participants review general application of finite element methodology and the specific application of the NASA Structural Analysis System (NASTRAN) to a variety of static and dynamic structural problems.

  2. Officer Training Research and Implications for Executive Training.

    ERIC Educational Resources Information Center

    Haverland, Edgar M.

    A pragmatic approach to the problem of training military supervisors of technical personnel is suggested for executive training. In the end-product system performance point of view, the job is defined and structured by detailed task description. Training involves the statement of precise and specific objectives. (author/ly)

  3. The Arabization of a Full-Text Database Interface.

    ERIC Educational Resources Information Center

    Fayen, Emily Gallup; And Others

    The 1981 design specifications for the Egyptian National Scientific and Technical Information Network (ENSTINET) stipulated that major end-user facilities of the system should be bilingual in English and Arabic. Many characteristics of the Arabic alphabet and language impact computer applications, and there exists no universally accepted character…

  4. 77 FR 27869 - Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Considered HAC Candidate: Iatrogenic Pneumothorax With Venous Catheterization 3. Present on Admission (POA.... History of Measures Adopted for the Hospital IQR Program b. Maintenance of Technical Specifications for...-Associated Infection (HAI) Measures (A) Proposed Central Line Associated Blood Stream Infections ((CLABSI...

  5. Stefanie Van Wychen | NREL

    Science.gov Websites

    Education M.S., Soil Science, Colorado State University, 2006 B.S., Soil Science/Environmental Studies Ash in Algal Biomass, NREL Technical Report (2013) "Nitrates in soil and plant systems across ;Quantifying nitrate leaching below root zone across site specific management zones," presented at Soil

  6. 33 CFR 157.12d - Technical specifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section. The sampling probes located in the overboard discharge lines and the piping system connecting the sampling probes to the oil content meter must meet the requirements of this paragraph. (2) The piping and probes must be— (i) Of a material resistant to fire, corrosion, and oil; and (ii) Of adequate strength...

  7. Sharing data between mobile devices, connected vehicles and infrastructure - task 3: concept of operations : technical memorandum –final.

    DOT National Transportation Integrated Search

    2016-07-13

    This report describes the concept of operation for the use of mobile devices in a connected vehicle environment. Specifically, it identifies the needs, conceptual system, and potential scenarios that serve as the basis for demonstrating both safety a...

  8. 26 CFR 1.482-2A - Determination of taxable income in specific situations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... property. Example 3. In 1967 X undertakes to develop product M in its research and development department... likely to remain unique, (e) The degree and duration of protection afforded to the property under the..., systems, procedures, campaigns, surveys, studies, forecasts, estimates, customer lists, technical data...

  9. CODAP: Control Card Specifications for the Univac 1108.

    ERIC Educational Resources Information Center

    Stacey, William D.; And Others

    The document is one of three in a series of technical reports covering the control card and programing aspects of the Comprehensive Occupational Data Analysis Programs (CODAP), a highly interactive and efficient system of computer routines for analyzing, organizing, and reporting occupational information. The document contains control card…

  10. Pollution Analyzing and Monitoring Instruments.

    ERIC Educational Resources Information Center

    1972

    Compiled in this book is basic, technical information useful in a systems approach to pollution control. Descriptions and specifications are given of what is available in ready made, on-the-line commercial equipment for sampling, monitoring, measuring and continuously analyzing the multitudinous types of pollutants found in the air, water, soil,…

  11. Nursing Assistant. Curriculum Guide. Invest in Success.

    ERIC Educational Resources Information Center

    Idaho State Dept. of Education, Boise. Div. of Vocational Education.

    Under the Idaho state system for curriculum development in vocational education, Technical Committees made up solely of industry personnel are responsible for drawing up task lists for each program. Based on a task list specific to the field, this curriculum guide provides the competencies needed by nursing assistants enrolled in postsecondary,…

  12. 33 CFR 148.8 - How are certifying entities designated and used for purposes of this subchapter?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... be associated with the CE's duties for the specific project; (7) In-house availability of, or access to, appropriate technology such as computer modeling programs and hardware or testing materials and...-based structures and project-related structures, systems, and equipment; (6) Technical capabilities...

  13. 33 CFR 148.8 - How are certifying entities designated and used for purposes of this subchapter?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... be associated with the CE's duties for the specific project; (7) In-house availability of, or access to, appropriate technology such as computer modeling programs and hardware or testing materials and...-based structures and project-related structures, systems, and equipment; (6) Technical capabilities...

  14. A Strategy for Efficiently Verifying Requirements Specifications Using Composition and Invariants

    DTIC Science & Technology

    2003-09-05

    Colle - sur - Loup , France, Oct. 1984. Springer-Verlag. [34] J. Ramish. Empirical studies of compositional abstraction. Technical report, Naval Research...global to modular temporal rea- soning about programs. In K. R. Apt, editor, Proc. NATO Adv. Study Inst. on Logics and Models of Concurrent Systems, La

  15. An Analysis of the Students Enrolled in the Correspondence Study Course, "Medical Terminology."

    ERIC Educational Resources Information Center

    Schrader, Marvin A.

    A study was conducted to obtain information regarding students enrolled in a Medical Terminology correspondence course developed jointly by the Wisconsin Vocational, Technical and Adult Education System and the University of Wisconsin's Extension Division. Specifically, the study sought to gather information about student types and…

  16. Instructional Technology in the Armed Forces.

    ERIC Educational Resources Information Center

    Hitchens, Howard B., Jr.

    Broad areas of communications media used in technical training in specific occupational skills within the armed forces are examined in the first part of this report. These areas include: traditional audiovisual media, television, the techniques of programed instruction and instructional systems development, and the use of computers. In the second…

  17. 7 CFR 802.0 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements set forth in this part 802 describe certain specifications, tolerances, and other technical... Standards and Technology (NIST) Handbook 44, “Specifications, Tolerances, and Other Technical Requirements...), “Specifications and Tolerances for Reference Standards and Field Standard Weights and Measures,” (Handbook 105-1...

  18. Application of Recommended Design Practices for Conceptual Nuclear Fusion Space Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Williams, Craig H.

    2004-01-01

    An AIAA Special Project Report was recently produced by AIAA's Nuclear and Future Flight Propulsion Technical Committee and is currently in peer review. The Report provides recommended design practices for conceptual engineering studies of nuclear fusion space propulsion systems. Discussion and recommendations are made on key topics including design reference missions, degree of technological extrapolation and concomitant risk, thoroughness in calculating mass properties (nominal mass properties, weight-growth contingency and propellant margins, and specific impulse), and thoroughness in calculating power generation and usage (power-flow, power contingencies, specific power). The report represents a general consensus of the nuclear fusion space propulsion system conceptual design community and proposes 15 recommendations. This paper expands on the Report by providing specific examples illustrating how to apply each of the recommendations.

  19. Proceedings of the Annual Meeting of the Technical Documentation Division (21st) Held in Monterey, California on 23-25 May 1979.

    DTIC Science & Technology

    1979-05-01

    O AIMSAND PRPOSE...Reproduction Systems Section J.R. Sutton Preparation and Management of Specifications Section S. Alvine, Jr Technical Publications Section R.E. Knob -4 - o ...May23,zd 1979 " THE . Ty AWARD . .. :: ,’:. , ,° % ’’ " " " -"" "" .% - """•°" .’ ""’ ’" o "’ -""" ’" " e "" "" "’ ."e-d"" t"’’ " %"c" o ,

  20. Using of Aerogel to Improve Thermal Insulating Properties of Windows

    NASA Astrophysics Data System (ADS)

    Valachova, Denisa; Zdrazilova, Nada; Panovec, Vladan; Skotnicova, Iveta

    2018-06-01

    For the best possible thermal-technical properties of building structures it is necessary to use materials with very low thermal conductivity. Due to the increasing thermal-technical requirements for building structures, the insulating materials are developed. One of the modern thermal insulating materials is so-called aerogel. Unfortunately, this material is not used in the field of external thermal insulation composite systems because of its price and its properties. The aim of this paper is to present possibilities of using this insulating material in the civil engineering - specifically a usage of aerogel in the production of windows.

  1. A Suggested Approach for Producing VAMS Air Transportation System Technology Roadmaps

    NASA Technical Reports Server (NTRS)

    Weathers, Del

    2002-01-01

    This viewgraph presentation provides an overview on the use of technology 'roadmaps' in order to facilitate the research development of VAMS (Virtual Airspace Modeling and Simulation). These roadmaps are to be produced by each concept team, updated annually, discussed at the technical interchange meetings (TIMs), shared among all VAMS participants, and made available electronically. These concept-specific technology roadmaps will be subsequently blended into an integrated catalog of roadmaps, technical discussions, and research recommendations. A historical example of ATM (Air Traffic Management) research and technology from 1940 to 1999 as shown in a series of 'roadmaps' is also included.

  2. Privacy Protection through pseudonymisation in eHealth.

    PubMed

    De Meyer, F; De Moor, G; Reed-Fourquet, L

    2008-01-01

    The ISO TC215 WG4 pseudonymisation task group has produced in 2008 a first version of a technical specification for the application of pseudonymisation in Healthcare Informatics 0. This paper investigates the principles set out in the technical specification as well as its implications in eHealth. The technical specification starts out with a conceptual model and evolves from a theoretical model to a real life model by adding assumptions on the observability of personal data.

  3. Technical communication. Perspectives for the Eighties, part 2

    NASA Technical Reports Server (NTRS)

    Mathes, J. C. (Compiler); Pinelli, T. E. (Compiler)

    1981-01-01

    The importance of technical writing as a separate discipline is suggested. Some specific areas addressed were: technical writing skills industry needs, definitions of technical writing, the hows and whys of inhouse writing, and the nature of the composing process in technical comunication.

  4. International comparisons of the technical efficiency of the hospital sector: panel data analysis of OECD countries using parametric and non-parametric approaches.

    PubMed

    Varabyova, Yauheniya; Schreyögg, Jonas

    2013-09-01

    There is a growing interest in the cross-country comparisons of the performance of national health care systems. The present work provides a comparison of the technical efficiency of the hospital sector using unbalanced panel data from OECD countries over the period 2000-2009. The estimation of the technical efficiency of the hospital sector is performed using nonparametric data envelopment analysis (DEA) and parametric stochastic frontier analysis (SFA). Internal and external validity of findings is assessed by estimating the Spearman rank correlations between the results obtained in different model specifications. The panel-data analyses using two-step DEA and one-stage SFA show that countries, which have higher health care expenditure per capita, tend to have a more technically efficient hospital sector. Whether the expenditure is financed through private or public sources is not related to the technical efficiency of the hospital sector. On the other hand, the hospital sector in countries with higher income inequality and longer average hospital length of stay is less technically efficient. Copyright © 2013 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.

  5. Open-source point-of-care electronic medical records for use in resource-limited settings: systematic review and questionnaire surveys

    PubMed Central

    Bru, Juan; Berger, Christopher A

    2012-01-01

    Background Point-of-care electronic medical records (EMRs) are a key tool to manage chronic illness. Several EMRs have been developed for use in treating HIV and tuberculosis, but their applicability to primary care, technical requirements and clinical functionalities are largely unknown. Objectives This study aimed to address the needs of clinicians from resource-limited settings without reliable internet access who are considering adopting an open-source EMR. Study eligibility criteria Open-source point-of-care EMRs suitable for use in areas without reliable internet access. Study appraisal and synthesis methods The authors conducted a comprehensive search of all open-source EMRs suitable for sites without reliable internet access. The authors surveyed clinician users and technical implementers from a single site and technical developers of each software product. The authors evaluated availability, cost and technical requirements. Results The hardware and software for all six systems is easily available, but they vary considerably in proprietary components, installation requirements and customisability. Limitations This study relied solely on self-report from informants who developed and who actively use the included products. Conclusions and implications of key findings Clinical functionalities vary greatly among the systems, and none of the systems yet meet minimum requirements for effective implementation in a primary care resource-limited setting. The safe prescribing of medications is a particular concern with current tools. The dearth of fully functional EMR systems indicates a need for a greater emphasis by global funding agencies to move beyond disease-specific EMR systems and develop a universal open-source health informatics platform. PMID:22763661

  6. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    NASA Astrophysics Data System (ADS)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  7. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  8. Context-specific energy strategies: coupling energy system visions with feasible implementation scenarios.

    PubMed

    Trutnevyte, Evelina; Stauffacher, Michael; Schlegel, Matthias; Scholz, Roland W

    2012-09-04

    Conventional energy strategy defines an energy system vision (the goal), energy scenarios with technical choices and an implementation mechanism (such as economic incentives). Due to the lead of a generic vision, when applied in a specific regional context, such a strategy can deviate from the optimal one with, for instance, the lowest environmental impacts. This paper proposes an approach for developing energy strategies by simultaneously, rather than sequentially, combining multiple energy system visions and technically feasible, cost-effective energy scenarios that meet environmental constraints at a given place. The approach is illustrated by developing a residential heat supply strategy for a Swiss region. In the analyzed case, urban municipalities should focus on reducing heat demand, and rural municipalities should focus on harvesting local energy sources, primarily wood. Solar thermal units are cost-competitive in all municipalities, and their deployment should be fostered by information campaigns. Heat pumps and building refurbishment are not competitive; thus, economic incentives are essential, especially for urban municipalities. In rural municipalities, wood is cost-competitive, and community-based initiatives are likely to be most successful. Thus, the paper shows that energy strategies should be spatially differentiated. The suggested approach can be transferred to other regions and spatial scales.

  9. Technical challenges in the isolation and analysis of circulating tumor cells.

    PubMed

    van der Toom, Emma E; Verdone, James E; Gorin, Michael A; Pienta, Kenneth J

    2016-09-20

    Increasing evidence suggests that cancer cells display dynamic molecular changes in response to systemic therapy. Circulating tumor cells (CTCs) in the peripheral blood represent a readily available source of cancer cells with which to measure this dynamic process. To date, a large number of strategies to isolate and characterize CTCs have been described. These techniques, however, each have unique limitations in their ability to sensitively and specifically detect these rare cells. In this review we focus on the technical limitations and pitfalls of the most common CTC isolation and detection strategies. Additionally, we emphasize the difficulties in correctly classifying rare cells as CTCs using common biomarkers. As for assays developed in the future, the first step must be a uniform and clear definition of the criteria for assigning an object as a CTC based on disease-specific biomarkers.

  10. SHARP's systems engineering challenge: rectifying integrated product team requirements with performance issues in an evolutionary spiral development acquisition

    NASA Astrophysics Data System (ADS)

    Kuehl, C. Stephen

    2003-08-01

    Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics requirements specifications. Utilizing the draft NAVAIR SE guideline handbook and the ANSI/EIA-632 standard: Processes for Engineering a System, a systems engineering tailored process approach was adopted for the accelerated SHARP EMD prgram. Tailoring SE processes in this accelerated product delivery environment provided unique opportunities to be technically creative in the establishment of a product performance baseline. This paper provides an historical overview of the systems engineering activities spanning the prototype phase through the EMD SHARP program phase, the performance requirement capture activities and refinement process challenges, and what SE process improvements can be applied to future SHARP-like programs adopting a compressed, evolutionary spiral development acquisition paradigm.

  11. Model-Based Systems

    NASA Technical Reports Server (NTRS)

    Frisch, Harold P.

    2007-01-01

    Engineers, who design systems using text specification documents, focus their work upon the completed system to meet Performance, time and budget goals. Consistency and integrity is difficult to maintain within text documents for a single complex system and more difficult to maintain as several systems are combined into higher-level systems, are maintained over decades, and evolve technically and in performance through updates. This system design approach frequently results in major changes during the system integration and test phase, and in time and budget overruns. Engineers who build system specification documents within a model-based systems environment go a step further and aggregate all of the data. They interrelate all of the data to insure consistency and integrity. After the model is constructed, the various system specification documents are prepared, all from the same database. The consistency and integrity of the model is assured, therefore the consistency and integrity of the various specification documents is insured. This article attempts to define model-based systems relative to such an environment. The intent is to expose the complexity of the enabling problem by outlining what is needed, why it is needed and how needs are being addressed by international standards writing teams.

  12. Investigation of storage system designs and techniques for optimizing energy conservation in integrated utility systems. Volume 3: (Assessment of technical and cost characteristics of candidate IUS energy storage devices)

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Six energy storage technologies (inertial, superconducting magnetic, electrochemical, chemical, compressed air, and thermal) were assessed and evaluated for specific applicability to the IUS. To provide a perspective for the individual storage technologies, a brief outline of the general nature of energy storage and its significance to the user is presented.

  13. Quality Attribute-Guided Evaluation of NoSQL Databases: An Experience Report

    DTIC Science & Technology

    2014-10-18

    detailed technical evaluations of NoSQL databases specifically, and big data systems in general, that have become apparent during our study... big data , software systems [Agarwal 2011]. Internet-born organizations such as Google and Amazon are at the cutting edge of this revolution...Chang 2008], along with those of numerous other big data innovators, have made a variety of open source and commercial data management technologies

  14. Materials And Processes Technical Information System (MAPTIS) LDEF materials database

    NASA Technical Reports Server (NTRS)

    Davis, John M.; Strickland, John W.

    1992-01-01

    The Materials and Processes Technical Information System (MAPTIS) is a collection of materials data which was computerized and is available to engineers in the aerospace community involved in the design and development of spacecraft and related hardware. Consisting of various database segments, MAPTIS provides the user with information such as material properties, test data derived from tests specifically conducted for qualification of materials for use in space, verification and control, project management, material information, and various administrative requirements. A recent addition to the project management segment consists of materials data derived from the LDEF flight. This tremendous quantity of data consists of both pre-flight and post-flight data in such diverse areas as optical/thermal, mechanical and electrical properties, atomic concentration surface analysis data, as well as general data such as sample placement on the satellite, A-O flux, equivalent sun hours, etc. Each data point is referenced to the primary investigator(s) and the published paper from which the data was taken. The MAPTIS system is envisioned to become the central location for all LDEF materials data. This paper consists of multiple parts, comprising a general overview of the MAPTIS System and the types of data contained within, and the specific LDEF data element and the data contained in that segment.

  15. Multi-agent system as a new approach to effective chronic heart failure management: key considerations.

    PubMed

    Mohammadzadeh, Niloofar; Safdari, Reza; Rahimi, Azin

    2013-09-01

    Given the importance of the follow-up of chronic heart failure (CHF) patients to reduce common causes of re-admission and deterioration of their status that lead to imposing spiritual and physical costs on patients and society, modern technology tools should be used to the best advantage. The aim of this article is to explain key points which should be considered in designing an appropriate multi-agent system to improve CHF management. In this literature review articles were searched with keywords like multi-agent system, heart failure, chronic disease management in Science Direct, Google Scholar and PubMed databases without regard to the year of publications. Agents are an innovation in the field of artificial intelligence. Because agents are capable of solving complex and dynamic health problems, to take full advantage of e-Health, the healthcare system must take steps to make use of this technology. Key factors in CHF management through a multi-agent system approach must be considered such as organization, confidentiality in general aspects and design and architecture points in specific aspects. Note that use of agent systems only with a technical view is associated with many problems. Hence, in delivering healthcare to CHF patients, considering social and human aspects is essential. It is obvious that identifying and resolving technical and non-technical challenges is vital in the successful implementation of this technology.

  16. Multi-Agent System as a New Approach to Effective Chronic Heart Failure Management: Key Considerations

    PubMed Central

    Mohammadzadeh, Niloofar; Rahimi, Azin

    2013-01-01

    Objectives Given the importance of the follow-up of chronic heart failure (CHF) patients to reduce common causes of re-admission and deterioration of their status that lead to imposing spiritual and physical costs on patients and society, modern technology tools should be used to the best advantage. The aim of this article is to explain key points which should be considered in designing an appropriate multi-agent system to improve CHF management. Methods In this literature review articles were searched with keywords like multi-agent system, heart failure, chronic disease management in Science Direct, Google Scholar and PubMed databases without regard to the year of publications. Results Agents are an innovation in the field of artificial intelligence. Because agents are capable of solving complex and dynamic health problems, to take full advantage of e-Health, the healthcare system must take steps to make use of this technology. Key factors in CHF management through a multi-agent system approach must be considered such as organization, confidentiality in general aspects and design and architecture points in specific aspects. Conclusions Note that use of agent systems only with a technical view is associated with many problems. Hence, in delivering healthcare to CHF patients, considering social and human aspects is essential. It is obvious that identifying and resolving technical and non-technical challenges is vital in the successful implementation of this technology. PMID:24195010

  17. Altimetric system: Earth observing system. Volume 2h: Panel report

    NASA Technical Reports Server (NTRS)

    Bindschadler, Robert A.; Born, George; Chase, Robert R. P.; Fu, Lee-Lueng; Mouginis-Mark, Peter; Parsons, Chester; Tapley, Byron

    1987-01-01

    A rationale and recommendations for planning, implementing, and operating an altimetric system aboard the Earth observing system (Eos) spacecraft is provided. In keeping with the recommendations of the Eos Science and Mission Requirements Working Group, a complete altimetric system is defined that is capable of perpetuating the data set to be derived from TOPEX/Poseidon, enabling key scientific questions to be addressed. Since the scientific utility and technical maturity of spaceborne radar altimeters is well documented, the discussion is limited to highlighting those Eos-specific considerations that materially impact upon radar altimetric measurements.

  18. Study of Synthetic Vision Systems (SVS) and Velocity-vector Based Command Augmentation System (V-CAS) on Pilot Performance

    NASA Technical Reports Server (NTRS)

    Liu, Dahai; Goodrich, Ken; Peak, Bob

    2006-01-01

    This study investigated the effects of synthetic vision system (SVS) concepts and advanced flight controls on single pilot performance (SPP). Specifically, we evaluated the benefits and interactions of two levels of terrain portrayal, guidance symbology, and control-system response type on SPP in the context of lower-landing minima (LLM) approaches. Performance measures consisted of flight technical error (FTE) and pilot perceived workload. In this study, pilot rating, control type, and guidance symbology were not found to significantly affect FTE or workload. It is likely that transfer from prior experience, limited scope of the evaluation task, specific implementation limitations, and limited sample size were major factors in obtaining these results.

  19. Architecture of a high-performance surgical guidance system based on C-arm cone-beam CT: software platform for technical integration and clinical translation

    NASA Astrophysics Data System (ADS)

    Uneri, Ali; Schafer, Sebastian; Mirota, Daniel; Nithiananthan, Sajendra; Otake, Yoshito; Reaungamornrat, Sureerat; Yoo, Jongheun; Stayman, J. Webster; Reh, Douglas; Gallia, Gary L.; Khanna, A. Jay; Hager, Gregory; Taylor, Russell H.; Kleinszig, Gerhard; Siewerdsen, Jeffrey H.

    2011-03-01

    Intraoperative imaging modalities are becoming more prevalent in recent years, and the need for integration of these modalities with surgical guidance is rising, creating new possibilities as well as challenges. In the context of such emerging technologies and new clinical applications, a software architecture for cone-beam CT (CBCT) guided surgery has been developed with emphasis on binding open-source surgical navigation libraries and integrating intraoperative CBCT with novel, application-specific registration and guidance technologies. The architecture design is focused on accelerating translation of task-specific technical development in a wide range of applications, including orthopaedic, head-and-neck, and thoracic surgeries. The surgical guidance system is interfaced with a prototype mobile C-arm for high-quality CBCT and through a modular software architecture, integration of different tools and devices consistent with surgical workflow in each of these applications is realized. Specific modules are developed according to the surgical task, such as: 3D-3D rigid or deformable registration of preoperative images, surgical planning data, and up-to-date CBCT images; 3D-2D registration of planning and image data in real-time fluoroscopy and/or digitally reconstructed radiographs (DRRs); compatibility with infrared, electromagnetic, and video-based trackers used individually or in hybrid arrangements; augmented overlay of image and planning data in endoscopic or in-room video; real-time "virtual fluoroscopy" computed from GPU-accelerated DRRs; and multi-modality image display. The platform aims to minimize offline data processing by exposing quantitative tools that analyze and communicate factors of geometric precision. The system was translated to preclinical phantom and cadaver studies for assessment of fiducial (FRE) and target registration error (TRE) showing sub-mm accuracy in targeting and video overlay within intraoperative CBCT. The work culminates in the development of a CBCT guidance system (reported here for the first time) that leverages the technical developments in Carm CBCT and associated technologies for realizing a high-performance system for translation to clinical studies.

  20. Antenna Electronics Concept for the Next-Generation Very Large Array

    NASA Astrophysics Data System (ADS)

    Beasley, Anthony J.; Jackson, Jim; Selina, Robert

    2017-01-01

    The National Radio Astronomy Observatory (NRAO), in collaboration with its international partners, completed two major projects over the past decade: the sensitivity upgrade for the Karl Jansky Very Large Array (VLA) and the construction of the Atacama Large Millimeter/Sub-Millimeter Array (ALMA). The NRAO is now considering the scientific potential and technical feasibility of a next-generation VLA (ngVLA) with an emphasis on thermal imaging at milli-arcsecond resolution. The preliminary goals for the ngVLA are to increase both the system sensitivity and angular resolution of the VLA tenfold and to cover a frequency range of 1.2-116 GHz.A number of key technical challenges have been identified for the project. These include cost-effective antenna manufacturing (in the hundreds), suitable wide-band feed and receiver designs, broad-band data transmission, and large-N correlators. Minimizing the overall operations cost is also a fundamental design requirement.The designs of the antenna electronics, reference distribution system, and data transmission system are anticipated to be major construction and operations cost drivers for the facility. The electronics must achieve a high level of performance, while maintaining low operation and maintenance costs and a high level of reliability. Additionally, due to the uncertainty in the feasibility of wideband receivers, advancements in digitizer technology, and budget constraints, the hardware system architecture should be scalable to the number of receiver bands and the speed and resolution of available digitizers.Here, we present the projected performance requirements of the ngVLA, a proposed block diagram for the instrument’s electronics systems, parameter tradeoffs within the system specifications, and areas of technical risk where technical advances may be required for successful production and installation.

  1. Saguaro Power Plant Solar Repowering Project. Volume II. System requirements specification. Final technical report, September 1979-July 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, E.R.

    1980-07-01

    This specification defines the system and subsystem characteristics, design requirements, and system environmental requirements for the Saguaro Power Plant Solar Repowering Project. This project involves the solar repowering of all (120.2 MWe gross) of the 115 MWe net power No. One steam-Rankine unit of the Arizona Public Service Company's Saguaro station. The receiver heat transport fluid is draw salt (60% sodium nitrate and 40% potassium nitrate) that is also used to provide 3.8 hours of sensible heat thermal energy storage. The quad-cavity type receiver is mounted on a tower within a single surrounding collector field of 10,500 second generation heliostats.

  2. SafeConnect Solar - Final Scientific/Technical Report (Updated)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McNish, Zachary

    2016-02-03

    Final Scientific/Technical Report from Tier 0 SunShot Incubator award for hardware-based solution to reducing soft costs of installed solar. The primary objective of this project was for SafeConnect Solar (“SafeConnect”) to create working proof-of-concept hardware prototypes from its proprietary intellectual property and business concepts for a plug-and-play, safety-oriented hardware solution for photovoltaic solar systems. Specifically, SafeConnect sought to build prototypes of its “SmartBox” and related cabling and connectors, as well as the firmware needed to run the hardware. This hardware is designed to ensure a residential PV system installed with it can address all safety concerns that currently form themore » basis of AHJ electrical permitting and licensing requirements, thereby reducing the amount of permitting and specialized labor required on a residential PV system, and also opening up new sales channels and customer acquisition opportunities.« less

  3. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallas, M.D.

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less

  4. Lessons Learned from Ares I Upper Stage Structures and Thermal Design

    NASA Technical Reports Server (NTRS)

    Ahmed, Rafiq

    2012-01-01

    The Ares 1 Upper Stage was part of the vehicle intended to succeed the Space Shuttle as the United States manned spaceflight vehicle. Although the Upper Stage project was cancelled, there were many lessons learned that are applicable to future vehicle design. Lessons learned that are briefly detailed in this Technical Memorandum are for specific technical areas such as tank design, common bulkhead design, thrust oscillation, control of flight and slosh loads, purge and hazardous gas system. In addition, lessons learned from a systems engineering and vehicle integration perspective are also included, such as computer aided design and engineering, scheduling, and data management. The need for detailed systems engineering in the early stages of a project is emphasized throughout this report. The intent is that future projects will be able to apply these lessons learned to keep costs down, schedules brief, and deliver products that perform to the expectations of their customers.

  5. Obtaining Technical Support for Superfund, RCRA and Brownfields Site Issues Fact Sheet

    EPA Pesticide Factsheets

    EPA’s Technical Support Centers (TSCs) and other technical support services are available to Regional RemedialProject Managers, Corrective Action Staff, and On-Scene Coordinators needing specialized technical expertisefor specific tasks or projects.

  6. EEAP lighting survey study at the Red River Army Depot, Texarkana, Texas. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The purpose of the study was to perform a limited site survey of specific buildings at the facility, identify specific Energy Conservation Opportunities (ECOs) that exist, and then evaluate these ECOs for technical and economic feasibility. These ECOs were limited to building interior lighting and it`s effects on the heating, ventilating and air conditioning (HVAC) systems. This survey was conducted with the assistance of many individuals at the facility.

  7. The NASA Integrated Information Technology Architecture

    NASA Technical Reports Server (NTRS)

    Baldridge, Tim

    1997-01-01

    This document defines an Information Technology Architecture for the National Aeronautics and Space Administration (NASA), where Information Technology (IT) refers to the hardware, software, standards, protocols and processes that enable the creation, manipulation, storage, organization and sharing of information. An architecture provides an itemization and definition of these IT structures, a view of the relationship of the structures to each other and, most importantly, an accessible view of the whole. It is a fundamental assumption of this document that a useful, interoperable and affordable IT environment is key to the execution of the core NASA scientific and project competencies and business practices. This Architecture represents the highest level system design and guideline for NASA IT related activities and has been created on the authority of the NASA Chief Information Officer (CIO) and will be maintained under the auspices of that office. It addresses all aspects of general purpose, research, administrative and scientific computing and networking throughout the NASA Agency and is applicable to all NASA administrative offices, projects, field centers and remote sites. Through the establishment of five Objectives and six Principles this Architecture provides a blueprint for all NASA IT service providers: civil service, contractor and outsourcer. The most significant of the Objectives and Principles are the commitment to customer-driven IT implementations and the commitment to a simpler, cost-efficient, standards-based, modular IT infrastructure. In order to ensure that the Architecture is presented and defined in the context of the mission, project and business goals of NASA, this Architecture consists of four layers in which each subsequent layer builds on the previous layer. They are: 1) the Business Architecture: the operational functions of the business, or Enterprise, 2) the Systems Architecture: the specific Enterprise activities within the context of IT systems, 3) the Technical Architecture: a common, vendor-independent framework for design, integration and implementation of IT systems and 4) the Product Architecture: vendor=specific IT solutions. The Systems Architecture is effectively a description of the end-user "requirements". Generalized end-user requirements are discussed and subsequently organized into specific mission and project functions. The Technical Architecture depicts the framework, and relationship, of the specific IT components that enable the end-user functionality as described in the Systems Architecture. The primary components as described in the Technical Architecture are: 1) Applications: Basic Client Component, Object Creation Applications, Collaborative Applications, Object Analysis Applications, 2) Services: Messaging, Information Broker, Collaboration, Distributed Processing, and 3) Infrastructure: Network, Security, Directory, Certificate Management, Enterprise Management and File System. This Architecture also provides specific Implementation Recommendations, the most significant of which is the recognition of IT as core to NASA activities and defines a plan, which is aligned with the NASA strategic planning processes, for keeping the Architecture alive and useful.

  8. Ecological assessment of nano-enabled supercapacitors for automotive applications

    NASA Astrophysics Data System (ADS)

    Weil, M.; Dura, H.; Shimon, B.; Baumann, M.; Zimmermann, B.; Ziemann, S.; Lei, C.; Markoulidis, F.; Lekakou, T.; Decker, M.

    2012-09-01

    New materials on nano scale have the potential to overcome existing technical barriers and are one of the most promising key technologies to enable the decoupling of economic growth and resource consumption. Developing these innovative materials for industrial applications means facing a complex quality profile, which includes among others technical, economic, and ecological aspects. So far the two latter aspects are not sufficiently included in technology development, especially from a life cycle point of view. Supercapacitors are considered a promising option for electric energy storage in hybrid and full electric cars. In comparison with presently used lithium based electro chemical storage systems supercapacitors possess a high specific power, but a relatively low specific energy. Therefore, the goal of ongoing research is to develop a new generation of supercapacitors with high specific power and high specific energy. To reach this goal particularly nano materials are developed and tested on cell level. In the presented study the ecological implications (regarding known environmental effects) of carbon based nano materials are analysed using Life Cycle Assessment (LCA). Major attention is paid to efficiency gains of nano particle production due to scaling up of such processes from laboratory to industrial production scales. Furthermore, a developed approach will be displayed, how to assess the environmental impact of nano materials on an automotive system level over the whole life cycle.

  9. Medical technology at home: safety-related items in technical documentation.

    PubMed

    Hilbers, Ellen S M; de Vries, Claudette G J C A; Geertsma, Robert E

    2013-01-01

    This study aimed to investigate the technical documentation of manufacturers on issues of safe use of their device in a home setting. Three categories of equipment were selected: infusion pumps, ventilators, and dialysis systems. Risk analyses, instructions for use, labels, and post market surveillance procedures were requested from manufacturers. Additionally, they were asked to fill out a questionnaire on collection of field experience, on incidents, and training activities. Specific risks of device operation by lay users in a home setting were incompletely addressed in the risk analyses. A substantial number of user manuals were designed for professionals, rather than for patients or lay carers. Risk analyses and user information often showed incomplete coherence. Post market surveillance was mainly based on passive collection of field experiences. Manufacturers of infusion pumps, ventilators, and dialysis systems pay insufficient attention to the specific risks of use by lay persons in home settings. It is expected that this conclusion is also applicable for other medical equipment for treatment at home. Manufacturers of medical equipment for home use should pay more attention to use errors, lay use and home-specific risks in design, risk analysis, and user information. Field experiences should be collected more actively. Coherence between risk analysis and user information should be improved. Notified bodies should address these aspects in their assessment. User manuals issued by institutions supervising a specific home therapy should be drawn up in consultation with the manufacturer.

  10. WARC and CCIR support for spectrum-orbit planning

    NASA Technical Reports Server (NTRS)

    Sawitz, P. H.

    1980-01-01

    Papers prepared for the use of the U.S. delegation to the 1979 World Administrative Radio Conference; papers contributed to the National CCIR study groups on broadcasting satellites and spectrum-orbit utilization; responses to specific requests for technical analyses and evaluations; and papers presented at technical conferences on related topics are presented. Nonlinear optimization methods for finding optimum positions of satellites in the fixed satellite service; the effects of geography on the use of the geostationary orbit; intercontinental orbit sharing; traffic coordination in interfering satellites operating in the fixed satellite service; and domestic fixed and broadcasting satellite systems are covered. A possible channel orbit plan for broadcasting satellite service in the U.S. and Canada; polarization for broadcasting satellite systems; and the communication capacity of the geostationary satellite orbit are also examined.

  11. Computing, Information and Communications Technology (CICT) Website

    NASA Technical Reports Server (NTRS)

    Hardman, John; Tu, Eugene (Technical Monitor)

    2002-01-01

    The Computing, Information and Communications Technology Program (CICT) was established in 2001 to ensure NASA's Continuing leadership in emerging technologies. It is a coordinated, Agency-wide effort to develop and deploy key enabling technologies for a broad range of mission-critical tasks. The NASA CICT program is designed to address Agency-specific computing, information, and communications technology requirements beyond the projected capabilities of commercially available solutions. The areas of technical focus have been chosen for their impact on NASA's missions, their national importance, and the technical challenge they provide to the Program. In order to meet its objectives, the CICT Program is organized into the following four technology focused projects: 1) Computing, Networking and Information Systems (CNIS); 2) Intelligent Systems (IS); 3) Space Communications (SC); 4) Information Technology Strategic Research (ITSR).

  12. Technical considerations for implementation of x-ray CT polymer gel dosimetry.

    PubMed

    Hilts, M; Jirasek, A; Duzenli, C

    2005-04-21

    Gel dosimetry is the most promising 3D dosimetry technique in current radiation therapy practice. X-ray CT has been shown to be a feasible method of reading out polymer gel dosimeters and, with the high accessibility of CT scanners to cancer hospitals, presents an exciting possibility for clinical implementation of gel dosimetry. In this study we report on technical considerations for implementation of x-ray CT polymer gel dosimetry. Specifically phantom design, CT imaging methods, imaging time requirements and gel dose response are investigated. Where possible, recommendations are made for optimizing parameters to enhance system performance. The dose resolution achievable with an optimized system is calculated given voxel size and imaging time constraints. Results are compared with MRI and optical CT polymer gel dosimetry results available in the literature.

  13. UAS Integration into the NAS Project

    NASA Technical Reports Server (NTRS)

    Bauer, Jeff

    2010-01-01

    The goal of the UAS Integration in the NAS Project is to contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS This goal will be accomplished through a two-phased approach of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Technical objectives include: PHASE 1: a) Validating the key technical areas identified by this project. System-level analyses, a State of the Art Analysis (SOAA), and a ConOps will identify the challenges and barriers preventing routine UAS access to the NAS. b) Developing a national roadmap and gap analysis identifying specific deliverables in the area of operations, procedures, and technologies that will impact future policy decisions. PHASE 2: a) Provide regulators with a methodology for developing airworthiness requirements for UAS and data to support development of certifications standards and regulatory guidance. b) Provide systems-level integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and Pilot Aircraft Interfaces (PAIs) in operationally relevant environments

  14. Distributed photovoltaic systems: Utility interface issues and their present status

    NASA Technical Reports Server (NTRS)

    Hassan, M.; Klein, J.

    1981-01-01

    Major technical issues involving the integration of distributed photovoltaics (PV) into electric utility systems are defined and their impacts are described quantitatively. An extensive literature search, interviews, and analysis yielded information about the work in progress and highlighted problem areas in which additional work and research are needed. The findings from the literature search were used to determine whether satisfactory solutions to the problems exist or whether satisfactory approaches to a solution are underway. It was discovered that very few standards, specifications, or guidelines currently exist that will aid industry in integrating PV into the utility system. Specific areas of concern identified are: (1) protection, (2) stability, (3) system unbalance, (4) voltage regulation and reactive power requirements, (5) harmonics, (6) utility operations, (7) safety, (8) metering, and (9) distribution system planning and design.

  15. Toward microendoscopy-inspired cardiac optogenetics in vivo: technical overview and perspective

    NASA Astrophysics Data System (ADS)

    Klimas, Aleksandra; Entcheva, Emilia

    2014-08-01

    The ability to perform precise, spatially localized actuation and measurements of electrical activity in the heart is crucial in understanding cardiac electrophysiology and devising new therapeutic solutions for control of cardiac arrhythmias. Current cardiac imaging techniques (i.e. optical mapping) employ voltage- or calcium-sensitive fluorescent dyes to visualize the electrical signal propagation through cardiac syncytium in vitro or in situ with very high-spatiotemporal resolution. The extension of optogenetics into the cardiac field, where cardiac tissue is genetically altered to express light-sensitive ion channels allowing electrical activity to be elicited or suppressed in a precise cell-specific way, has opened the possibility for all-optical interrogation of cardiac electrophysiology. In vivo application of cardiac optogenetics faces multiple challenges and necessitates suitable optical systems employing fiber optics to actuate and sense electrical signals. In this technical perspective, we present a compendium of clinically relevant access routes to different parts of the cardiac electrical conduction system based on currently employed catheter imaging systems and determine the quantitative size constraints for endoscopic cardiac optogenetics. We discuss the relevant technical advancements in microendoscopy, cardiac imaging, and optogenetics and outline the strategies for combining them to create a portable, miniaturized fiber-based system for all-optical interrogation of cardiac electrophysiology in vivo.

  16. Power System Trade Studies for the Lunar Surface Access Module

    NASA Technical Reports Server (NTRS)

    Kohout, Lisa, L.

    2008-01-01

    A Lunar Lander Preparatory Study (LLPS) was undertaken for NASA's Lunar Lander Pre-Project in 2006 to explore a wide breadth of conceptual lunar lander designs. Civil servant teams from nearly every NASA center responded with dozens of innovative designs that addressed one or more specific lander technical challenges. Although none of the conceptual lander designs sought to solve every technical design issue, each added significantly to the technical database available to the Lunar Lander Project Office as it began operations in 2007. As part of the LLPS, a first order analysis was performed to identify candidate power systems for the ascent and descent stages of the Lunar Surface Access Module (LSAM). A power profile by mission phase was established based on LSAM subsystem power requirements. Using this power profile, battery and fuel cell systems were modeled to determine overall mass and volume. Fuel cell systems were chosen for both the descent and ascent stages due to their low mass. While fuel cells looked promising based on these initial results, several areas have been identified for further investigation in subsequent studies, including the identification and incorporation of peak power requirements into the analysis, refinement of the fuel cell models to improve fidelity and incorporate ongoing technology developments, and broadening the study to include solar power.

  17. Availability of Data on Noncredit Education and Postsecondary Certifications: An Analysis of Selected State-Level Data Systems

    ERIC Educational Resources Information Center

    Sykes, Andrea R.; Szuplat, Mary A.; Decker, Cynthia G.

    2014-01-01

    Federal policymakers have interest in three specific areas of postsecondary career and technical education (CTE): associate degrees and certificates awarded in CTE, skills and training obtained through noncredit courses, and industry-recognized certifications. Research and data are readily available on students earning degrees and certificates in…

  18. Flexible Delivery. Will a Client Focus System Mean Better Learning?

    ERIC Educational Resources Information Center

    Misko, Josie

    This paper outlines and examines the implications of the main points of the national framework for flexible delivery of vocational education in Australia's technical and further education (TAFE) colleges. Endorsed by the National TAFE Chief Executives Committee in 1992, the framework establishes specific plans of action to be achieved by 1995. The…

  19. 78 FR 76289 - Request for Information To Gather Technical Expertise Pertaining to Data Elements, Metrics, Data...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-17

    ... information. To assist us in making a determination on your request, we encourage you to identify any specific... consumer decision-making. Organizations that have developed, or are developing, ratings systems for.... The Department is interested in a PIRS that takes into account information important to the Federal...

  20. 33 CFR 148.8 - How are certifying entities designated and used for purposes of this subchapter?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be associated with its duties for the specific project; (7) In-house availability of, or access to, appropriate technology such as computer modeling programs and hardware or testing materials and equipment; (8...-based structures and project-related structures, systems, and equipment; (6) Technical capabilities...

  1. 33 CFR 148.8 - How are certifying entities designated and used for purposes of this subchapter?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... be associated with its duties for the specific project; (7) In-house availability of, or access to, appropriate technology such as computer modeling programs and hardware or testing materials and equipment; (8...-based structures and project-related structures, systems, and equipment; (6) Technical capabilities...

  2. Modifications to the Vulnerability Model: A Simulation System for Assessing Damage Resulting from Marine Spills

    DTIC Science & Technology

    1979-03-01

    and they do not constituto a standard, specific-3tion, or regulation. This report, or portions thereof may not be used for advertising or sales ... promotion purposes. Citation of trade names and manufacturers does not constitute endorsement or approval of such products. I; Technical Report

  3. Wind Power Opportunities in St. Thomas, USVI: A Site-Specific Evaluation and Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lantz, E.; Warren, A.; Roberts, J. O.

    This NREL technical report utilizes a development framework originated by NREL and known by the acronym SROPTTC to assist the U.S. Virgin Islands in identifying and understanding concrete opportunities for wind power development in the territory. The report covers each of the seven components of the SROPTTC framework: Site, Resource, Off-take, Permitting, Technology, Team, and Capital as they apply to wind power in the USVI and specifically to a site in Bovoni, St. Thomas. The report concludes that Bovoni peninsula is a strong candidate for utility-scale wind generation in the territory. It represents a reasonable compromise in terms of windmore » resource, distance from residences, and developable terrain. Hurricane risk and variable terrain on the peninsula and on potential equipment transport routes add technical and logistical challenges but do not appear to represent insurmountable barriers. In addition, integration of wind power into the St. Thomas power system will present operational challenges, but based on experience in other islanded power systems, there are reasonable solutions for addressing these challenges.« less

  4. Security challenges in integration of a PHR-S into a standards based national EHR.

    PubMed

    Mense, Alexander; Hoheiser Pförtner, Franz; Sauermann, Stefan

    2014-01-01

    Health related data provided by patients themselves is expected to play a major role in future healthcare. Data from personal health devices, vaccination records, health diaries or observations of daily living, for instance, is stored in personal health records (PHR) which are maintained by personal health record systems (PHR-S). Combining this information with medical records provided by healthcare providers in electronic health records (EHR) is one of the next steps towards "personal care". Austria currently sets up a nationwide EHR system that incorporates all healthcare providers and is technically based on international standards (IHE, HL7, OASIS, ...). Looking at the expected potential of merging PHR and EHR data it is worth to analyse integration approaches. Although knowing that an integration requires the coordination of processes, information models and technical architectures, this paper specifically focuses on security issues by evaluating general security requirements for a PHR-S (based on HL7 PHR-S FM), comparing them with the information security specifications for the Austrian's national EHR (based on ISO/IES 27000 series) and identifying the main challenges as well as possible approaches.

  5. Design tool for estimating chemical hydrogen storage system characteristics for light-duty fuel cell vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brooks, Kriston P.; Sprik, Samuel J.; Tamburello, David A.

    The U.S. Department of Energy (DOE) has developed a vehicle framework model to simulate fuel cell-based light-duty vehicle operation for various hydrogen storage systems. This transient model simulates the performance of the storage system, fuel cell, and vehicle for comparison to DOE’s Technical Targets using four drive cycles/profiles. Chemical hydrogen storage models have been developed for the Framework model for both exothermic and endothermic materials. Despite the utility of such models, they require that material researchers input system design specifications that cannot be easily estimated. To address this challenge, a design tool has been developed that allows researchers to directlymore » enter kinetic and thermodynamic chemical hydrogen storage material properties into a simple sizing module that then estimates the systems parameters required to run the storage system model. Additionally, this design tool can be used as a standalone executable file to estimate the storage system mass and volume outside of the framework model and compare it to the DOE Technical Targets. These models will be explained and exercised with existing hydrogen storage materials.« less

  6. Electronic health systems: challenges faced by hospital-based providers.

    PubMed

    Agno, Christina Farala; Guo, Kristina L

    2013-01-01

    The purpose of this article is to discuss specific challenges faced by hospitals adopting the use of electronic medical records and implementing electronic health record (EHR) systems. Challenges include user and information technology support; ease of technical use and software interface capabilities; compliance; and financial, legal, workforce training, and development issues. Electronic health records are essential to preventing medical errors, increasing consumer trust and use of the health system, and improving quality and overall efficiency. Government efforts are focused on ways to accelerate the adoption and use of EHRs as a means of facilitating data sharing, protecting health information privacy and security, quickly identifying emerging public health threats, and reducing medical errors and health care costs and increasing quality of care. This article will discuss physician and nonphysician staff training before, during, and after implementation; the effective use of EHR systems' technical features; the selection of a capable and secure EHR system; and the development of collaborative system implementation. Strategies that are necessary to help health care providers achieve successful implementation of EHR systems will be addressed.

  7. National Computer Security Conference Proceedings (12th): Information Systems Security: Solutions for Today - Concepts for Tomorrow Held in Baltimore, Maryland on 10-13 October 1989

    DTIC Science & Technology

    1989-10-13

    and other non -technical aspects of the system). System-wide Perspective. The systerm that is being designed and engineered must include not just the...specifications and is regarded as the lowest-level (implementation) of detail.-’ Ihis decomposition follows the typical "top down" design methodology ...formal verification process has contributed to the security and correctness of the TCB design and implementation. FORMUL METHODOLOGY DESCRIPTION The

  8. Fiber Optic Geophysics Sensor Array

    NASA Astrophysics Data System (ADS)

    Grochowski, Lucjan

    1989-01-01

    The distributed optical sensor arrays are analysed in view of specific needs of 3-D seismic explorations methods. There are compared advantages and disadventages of arrays supported by the sensors which are modulated in intensity and phase. In these systems all-fiber optic structures and their compabilities with digital geophysic formats are discussed. It was shown that the arrays based on TDM systems with the intensity modulated sensors are economically and technically the best matched for geophysic systems supported by a large number of the sensors.

  9. 75 FR 20817 - Information Systems Technical Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC... Administration on technical questions that affect the level of export controls applicable to information systems...

  10. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  11. 75 FR 41404 - List of Approved Spent Fuel Storage Casks: NUHOMS®

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    .... The NRC is taking this action because the applicant identified that a certain Technical Specification (TS) for Boral characterization was not written precisely. Specifically, the requirements for meeting... changes to the technical specifications. The NRC also published a direct final rule on May 6, 2010 (75 FR...

  12. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  13. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  14. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  15. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  16. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  17. Integrated modeling tool for performance engineering of complex computer systems

    NASA Technical Reports Server (NTRS)

    Wright, Gary; Ball, Duane; Hoyt, Susan; Steele, Oscar

    1989-01-01

    This report summarizes Advanced System Technologies' accomplishments on the Phase 2 SBIR contract NAS7-995. The technical objectives of the report are: (1) to develop an evaluation version of a graphical, integrated modeling language according to the specification resulting from the Phase 2 research; and (2) to determine the degree to which the language meets its objectives by evaluating ease of use, utility of two sets of performance predictions, and the power of the language constructs. The technical approach followed to meet these objectives was to design, develop, and test an evaluation prototype of a graphical, performance prediction tool. The utility of the prototype was then evaluated by applying it to a variety of test cases found in the literature and in AST case histories. Numerous models were constructed and successfully tested. The major conclusion of this Phase 2 SBIR research and development effort is that complex, real-time computer systems can be specified in a non-procedural manner using combinations of icons, windows, menus, and dialogs. Such a specification technique provides an interface that system designers and architects find natural and easy to use. In addition, PEDESTAL's multiview approach provides system engineers with the capability to perform the trade-offs necessary to produce a design that meets timing performance requirements. Sample system designs analyzed during the development effort showed that models could be constructed in a fraction of the time required by non-visual system design capture tools.

  18. Digital control and data acquisition for high-value GTA welding

    NASA Astrophysics Data System (ADS)

    George, T. G.; Franco-Ferreira, E. A.

    Electric power for the Cassini space probe will be provided by radioisotope thermoelectric generators (RTG's) thermally driven by General-Purpose Heat Source (GPHS) modules. Each GPHS module contains four, 150-g, pellets of Pu-238O2, and each of the four pellets is encapsulated within a thin-wall iridium-alloy shell. GTA girth welding of these capsules is performed at Los Alamos National Laboratory (LANL) on an automated, digitally-controlled welding system. Baseline design considerations for system automation and strategies employed to maximize process yield, improve process consistency, and generate required quality assurance information are discussed. Design of the automated girth welding system was driven by a number of factors which militated for precise parametric control and data acquisition. Foremost among these factors was the extraordinary value of the capsule components. In addition, DOE order 5700.6B, which took effect on 23 Sep. 1986, required that all operations adhere to strict levels of process quality assurance. A detailed technical specification for the GPHS welding system was developed on the basis of a joint LANL/Westinghouse Savannah River Company (WSRC) design effort. After a competitive bidding process, Jetline Engineering, Inc., of Irvine, California, was selected as the system manufacturer. During the period over which four identical welding systems were fabricated, very close liason was maintained between the LANL/WSRC technical representatives and the vendor. The level of rapport was outstanding, and the end result was the 1990 delivery of four systems that met or exceeded all specification requirements.

  19. Flywheel energy storage for electromechanical actuation systems

    NASA Technical Reports Server (NTRS)

    Hockney, Richard L.; Goldie, James H.; Kirtley, James L.

    1991-01-01

    The authors describe a flywheel energy storage system designed specifically to provide load-leveling for a thrust vector control (TVC) system using electromechanical actuators (EMAs). One of the major advantages of an EMA system over a hydraulic system is the significant reduction in total energy consumed during the launch profile. Realization of this energy reduction will, however, require localized energy storage capable of delivering the peak power required by the EMAs. A combined flywheel-motor/generator unit which interfaces directly to the 20-kHz power bus represents an ideal candidate for this load leveling. The overall objective is the definition of a flywheel energy storage system for this application. The authors discuss progress on four technical objectives: (1) definition of the specifications for the flywheel-motor/generator system, including system-level trade-off analysis; (2) design of the flywheel rotor; (3) design of the motor/generator; and (4) determination of the configuration for the power management system.

  20. Flywheel energy storage for electromechanical actuation systems

    NASA Astrophysics Data System (ADS)

    Hockney, Richard L.; Goldie, James H.; Kirtley, James L.

    The authors describe a flywheel energy storage system designed specifically to provide load-leveling for a thrust vector control (TVC) system using electromechanical actuators (EMAs). One of the major advantages of an EMA system over a hydraulic system is the significant reduction in total energy consumed during the launch profile. Realization of this energy reduction will, however, require localized energy storage capable of delivering the peak power required by the EMAs. A combined flywheel-motor/generator unit which interfaces directly to the 20-kHz power bus represents an ideal candidate for this load leveling. The overall objective is the definition of a flywheel energy storage system for this application. The authors discuss progress on four technical objectives: (1) definition of the specifications for the flywheel-motor/generator system, including system-level trade-off analysis; (2) design of the flywheel rotor; (3) design of the motor/generator; and (4) determination of the configuration for the power management system.

  1. NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 11: The Voice of the User: How US Aerospace Engineers and Scientists View DoD Technical Reports

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Kennedy, John M.

    1991-01-01

    The project examines how the results of NASA/DOD research diffuse into the aerospace R&D process, and empirically analyzes the implications of the aerospace knowledge diffusion process. Specific issues considered are the roles played by government technical reports, the recognition of the value of scientific and technical information (STI), and the optimization of the STI aerospace transfer system. Information-seeking habits are assessed for the U.S. aerospace community, the general community, the academic sector, and the international community. U.S. aerospace engineers and scientists use 65 percent of working time to communicate STI, and prefer 'internal' STI over 'external' STI. The isolation from 'external' information is found to be detrimental to U.S. aerospace R&D in general.

  2. Selecting a software development methodology. [of digital flight control systems

    NASA Technical Reports Server (NTRS)

    Jones, R. E.

    1981-01-01

    The state of the art analytical techniques for the development and verification of digital flight control software is studied and a practical designer oriented development and verification methodology is produced. The effectiveness of the analytic techniques chosen for the development and verification methodology are assessed both technically and financially. Technical assessments analyze the error preventing and detecting capabilities of the chosen technique in all of the pertinent software development phases. Financial assessments describe the cost impact of using the techniques, specifically, the cost of implementing and applying the techniques as well as the relizable cost savings. Both the technical and financial assessment are quantitative where possible. In the case of techniques which cannot be quantitatively assessed, qualitative judgements are expressed about the effectiveness and cost of the techniques. The reasons why quantitative assessments are not possible will be documented.

  3. Selection and collection of multi parameter physiological data for cardiac rhythm diagnostic algorithm development

    NASA Astrophysics Data System (ADS)

    Bostock, J.; Weller, P.; Cooklin, M.

    2010-07-01

    Automated diagnostic algorithms are used in implantable cardioverter-defibrillators (ICD's) to detect abnormal heart rhythms. Algorithms misdiagnose and improved specificity is needed to prevent inappropriate therapy. Knowledge engineering (KE) and artificial intelligence (AI) could improve this. A pilot study of KE was performed with artificial neural network (ANN) as AI system. A case note review analysed arrhythmic events stored in patients ICD memory. 13.2% patients received inappropriate therapy. The best ICD algorithm had sensitivity 1.00, specificity 0.69 (p<0.001 different to gold standard). A subset of data was used to train and test an ANN. A feed-forward, back-propagation network with 7 inputs, a 4 node hidden layer and 1 output had sensitivity 1.00, specificity 0.71 (p<0.001). A prospective study was performed using KE to list arrhythmias, factors and indicators for which measurable parameters were evaluated and results reviewed by a domain expert. Waveforms from electrodes in the heart and thoracic bio-impedance; temperature and motion data were collected from 65 patients during cardiac electrophysiological studies. 5 incomplete datasets were due to technical failures. We concluded that KE successfully guided selection of parameters and ANN produced a usable system and that complex data collection carries greater risk of technical failure, leading to data loss.

  4. 30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Gas Operations (as incorporated by reference in § 250.198); and (ii) API Spec Q1, Specification for... in § 250.198). (3) All SSV's and USV's must meet the technical specifications of API Spec 6A and 6AV1. All SSSVs must meet the technical specifications of API Specification 14A (as incorporated by...

  5. 30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Gas Operations (as incorporated by reference in § 250.198); and (ii) API Spec Q1, Specification for... in § 250.198). (3) All SSV's and USV's must meet the technical specifications of API Spec 6A and 6AV1. All SSSVs must meet the technical specifications of API Specification 14A (as incorporated by...

  6. 30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Gas Operations (as incorporated by reference in § 250.198); and (ii) API Spec Q1, Specification for... in § 250.198). (3) All SSV's and USV's must meet the technical specifications of API Spec 6A and 6AV1. All SSSVs must meet the technical specifications of API Specification 14A (as incorporated by...

  7. Space Generic Open Avionics Architecture (SGOAA) reference model technical guide

    NASA Technical Reports Server (NTRS)

    Wray, Richard B.; Stovall, John R.

    1993-01-01

    This report presents a full description of the Space Generic Open Avionics Architecture (SGOAA). The SGOAA consists of a generic system architecture for the entities in spacecraft avionics, a generic processing architecture, and a six class model of interfaces in a hardware/software system. The purpose of the SGOAA is to provide an umbrella set of requirements for applying the generic architecture interface model to the design of specific avionics hardware/software systems. The SGOAA defines a generic set of system interface points to facilitate identification of critical interfaces and establishes the requirements for applying appropriate low level detailed implementation standards to those interface points. The generic core avionics system and processing architecture models provided herein are robustly tailorable to specific system applications and provide a platform upon which the interface model is to be applied.

  8. Development and Technical Validation of the Mobile Based Assistive Listening System: A Smartphone-Based Remote Microphone.

    PubMed

    Lopez, Esteban Alejandro; Costa, Orozimbo Alves; Ferrari, Deborah Viviane

    2016-10-01

    The purpose of this research note is to describe the development and technical validation of the Mobile Based Assistive Listening System (MoBALS), a free-of-charge smartphone-based remote microphone application. MoBALS Version 1.0 was developed for Android (Version 2.1 or higher) and was coded with Java using Eclipse Indigo with the Android Software Development Kit. A Wi-Fi router with background traffic and 2 affordable smartphones were used for debugging and technical validation comprising, among other things, multicasting capability, data packet loss, and battery consumption. MoBALS requires at least 2 smartphones connected to the same Wi-Fi router for signal transmission and reception. Subscriber identity module cards or Internet connections are not needed. MoBALS can be used alone or connected to a hearing aid or cochlear implant via direct audio input. Maximum data packet loss was 99.28%, and minimum battery life was 5 hr. Other relevant design specifications and their implementation are described. MoBALS performed as a remote microphone with enhanced accessibility features and avoids overhead expenses by using already-available and affordable technology. The further development and technical revalidation of MoBALS will be followed by clinical evaluation with persons with hearing impairment.

  9. Solar domestic hot water system installed at Texas City, Texas

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This is the final technical report of the solar energy system located at LaQuinta Motor Inn, Texas City, Texas. The system was designed to supply 63 percent of the total hot water load for a new 98 unit motor inn. The solar energy system consists of a 2100 square feet Raypack liquid flat plate collector subsystem and a 2500 gallon storage subsystem circulating hot water producing 3.67 x 10 to the 8th power Btu/year. Abstracts from the site files, specification references, drawings, installation, operation, and maintenance instructions are included.

  10. Earth orbital teleoperator systems evaluation

    NASA Technical Reports Server (NTRS)

    Shields, N. L., Jr.; Slaughter, P. H.; Brye, R. G.; Henderson, D. E.

    1979-01-01

    The mechanical extension of the human operator to remote and specialized environments poses a series of complex operational questions. A technical and scientific team was organized to investigate these questions through conducting specific laboratory and analytical studies. The intent of the studies was to determine the human operator requirements for remotely manned systems and to determine the particular effects that various system parameters have on human operator performance. In so doing, certain design criteria based on empirically derived data concerning the ultimate control system, the human operator, were added to the Teleoperator Development Program.

  11. Engineered Barrier System: Physical and Chemical Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P. Dixon

    2004-04-26

    The conceptual and predictive models documented in this Engineered Barrier System: Physical and Chemical Environment Model report describe the evolution of the physical and chemical conditions within the waste emplacement drifts of the repository. The modeling approaches and model output data will be used in the total system performance assessment (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. These models evaluate the range of potential water compositions within the emplacement drifts, resulting from the interaction of introduced materials and minerals in dust with water seeping into the drifts and with aqueous solutions forming bymore » deliquescence of dust (as influenced by atmospheric conditions), and from thermal-hydrological-chemical (THC) processes in the drift. These models also consider the uncertainty and variability in water chemistry inside the drift and the compositions of introduced materials within the drift. This report develops and documents a set of process- and abstraction-level models that constitute the engineered barrier system: physical and chemical environment model. Where possible, these models use information directly from other process model reports as input, which promotes integration among process models used for total system performance assessment. Specific tasks and activities of modeling the physical and chemical environment are included in the technical work plan ''Technical Work Plan for: In-Drift Geochemistry Modeling'' (BSC 2004 [DIRS 166519]). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system analysis model reports.« less

  12. International Behavior Analysis: The Operationalization Task

    DTIC Science & Technology

    1976-02-15

    IJiC. L This report eoBStlttttoa tha first technical report of year t^.-o of the Intcrr.ational Behavior Analysis (IM) Project, vhich is designed ...builders continued to generate "grond designs ," but none of them attempted to specify variable areas in a comprehensive fashion. Ac a result, specific...1970; Meckstroth, 1975). The distinction between "most similar systems" and "most different systems" designs presents the fundamental choice that a

  13. Ocean Thermal Energy Conversion power system development. Phase I: preliminary design. Final report. [ODSP-3 code; OTEC Steady-State Analysis Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-12-04

    The following appendices are included; Dynamic Simulation Program (ODSP-3); sample results of dynamic simulation; trip report - NH/sub 3/ safety precautions/accident records; trip report - US Coast Guard Headquarters; OTEC power system development, preliminary design test program report; medium turbine generator inspection point program; net energy analysis; bus bar cost of electricity; OTEC technical specifications; and engineer drawings. (WHK)

  14. Developing a Model for Predicting Snowpack Parameters Affecting Vehicle Mobility,

    DTIC Science & Technology

    1983-05-01

    Service River Forecast System -Snow accumulation and JO ablation model. NOAA Technical Memorandum NWS HYDRO-17, National Weather Service, JS Silver Spring... Forecast System . This model indexes each phys- ical process that occurs in the snowpack to the air temperature. Although this results in a signifi...pressure P Probability Q Energy Q Specific humidity R Precipitation s Snowfall depth T Air temperature t Time U Wind speed V Water vapor

  15. A case study evaluation of a Critical Care Information System adoption using the socio-technical and fit approach.

    PubMed

    Yusof, Maryati Mohd

    2015-07-01

    Clinical information systems have long been used in intensive care units but reports on their adoption and benefits are limited. This study evaluated a Critical Care Information System implementation. A case study summative evaluation was conducted, employing observation, interview, and document analysis in operating theatres and 16-bed adult intensive care units in a 400-bed Malaysian tertiary referral centre from the perspectives of users (nurses and physicians), management, and information technology staff. System implementation, factors influencing adoption, fit between these factors, and the impact of the Critical Care Information System were evaluated after eight months of operation. Positive influences on system adoption were associated with technical factors, including system ease of use, usefulness, and information relevancy; human factors, particularly user attitude; and organisational factors, namely clinical process-technology alignment and champions. Organisational factors such as planning, project management, training, technology support, turnover rate, clinical workload, and communication were barriers to system implementation and use. Recommendations to improve the current system problems were discussed. Most nursing staff positively perceived the system's reduction of documentation and data access time, giving them more time with patients. System acceptance varied among doctors. System use also had positive impacts on timesaving, data quality, and clinical workflow. Critical Care Information Systems is crucial and has great potentials in enhancing and delivering critical care. However, the case study findings showed that the system faced complex challenges and was underutilised despite its potential. The role of socio-technical factors and their fit in realizing the potential of Critical Care Information Systems requires continuous, in-depth evaluation and stakeholder understanding and acknowledgement. The comprehensive and specific evaluation measures of the Human-Organisation-Technology Fit framework can flexibly evaluate Critical Care Information Systems. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  16. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options.

    PubMed

    Rani, Manju; Nusrat, Sharmin; Hawken, Laura H

    2012-10-16

    Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.

  17. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options

    PubMed Central

    2012-01-01

    Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232

  18. Approach to developing reliable space reactor power systems

    NASA Technical Reports Server (NTRS)

    Mondt, Jack F.; Shinbrot, Charles H.

    1991-01-01

    During Phase II, the Engineering Development Phase, the SP-100 Project has defined and is pursuing a new approach to developing reliable power systems. The approach to developing such a system during the early technology phase is described along with some preliminary examples to help explain the approach. Developing reliable components to meet space reactor power system requirements is based on a top-down systems approach which includes a point design based on a detailed technical specification of a 100-kW power system. The SP-100 system requirements implicitly recognize the challenge of achieving a high system reliability for a ten-year lifetime, while at the same time using technologies that require very significant development efforts. A low-cost method for assessing reliability, based on an understanding of fundamental failure mechanisms and design margins for specific failure mechanisms, is being developed as part of the SP-100 Program.

  19. Acquisition of background and technical information and class trip planning

    NASA Technical Reports Server (NTRS)

    Mackinnon, R. M.; Wake, W. H.

    1981-01-01

    Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.

  20. Understanding the evolution of rice technology in China - from traditional agriculture to GM rice today.

    PubMed

    Shen, Xiaobai

    2010-01-01

    This paper provides an historical survey of the evolution of rice technology in China, from the traditional farming system to genetically modified rice today. Using sociotechnological analytical framework, it analyses rice technology as a socio-technical ensemble - a complex interaction of material and social elements, and discusses the specificity of technology development and its socio-technical outcomes. It points to two imperatives in rice variety development: wholesale transporting agricultural technology and social mechanism to developing countries are likely lead to negative consequences; indigenous innovation including deploying GM technology for seed varietal development and capturing/cultivating local knowledge will provide better solutions.

  1. Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

    NASA Astrophysics Data System (ADS)

    Vilja, John; Levack, Daniel

    1993-04-01

    The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

  2. Advanced propulsion concepts

    NASA Technical Reports Server (NTRS)

    Sercel, Joel C.

    1991-01-01

    The topics presented are covered in viewgraph form. The programmatic objective is to establish the feasibility of propulsion technologies for vastly expanded space activity. The technical objective is a revolutionary performance sought, such as: (1) about 1 kg/kW specific mass; (2) specific impulse tailored to mission requirements; (3) ability to use in-situ resources; (4) round-trips to Mars in months; (5) round-trips to outer planets in 1 to 2 years; and (6) the capability for robotic mission beyond the solar system.

  3. A survey of particle contamination in electronic devices

    NASA Technical Reports Server (NTRS)

    Adolphsen, J. W.; Kagdis, W. A.; Timmins, A. R.

    1976-01-01

    The experiences are given of a number of National Aeronautics and Space Administration (NASA) and Space and Missile System Organization (SAMSO) contractors with particle contamination, and the methods used for its prevention and detection, evaluates the bases for the different schemes, assesses their effectiveness, and identifies the problems associated with each. It recommends specific short-range tests or approaches appropriate to individual part-type categories and recommends that specific tasks be initiated to refine techniques and to resolve technical and application facets of promising solutions.

  4. Proceedings of the 48th International Wire and Cable Symposium (48th) Held in Atlantic City, New Jersey on 15-18 November 1999

    DTIC Science & Technology

    1999-11-18

    telecommunications and data processing installations, Berlin Offenbach: vde - verlag 4. DIN EN 187000: Specification of optical fiber cables...Berlin Offenbach : vde - verlag 5. DIN EN 188000: Specification of optical fibers, Berlin Offenbach : vde - verlag 6. IEC 60793-1: Optical fibers, Part 1...subsystem of customer premises up to a frequency of 100 MHz. The technical requirements of these balanced cabling systems are defined in the standards EN

  5. Wind Fins: Novel Lower-Cost Wind Power System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Morris; Dr. Will D. Swearingen

    This project evaluated the technical feasibility of converting energy from the wind with a novel “wind fin” approach. This patent-pending technology has three major components: (1) a mast, (2) a vertical, hinged wind structure or fin, and (3) a power takeoff system. The wing structure responds to the wind with an oscillating motion, generating power. The overall project goal was to determine the basic technical feasibility of the wind fin technology. Specific objectives were the following: (1) to determine the wind energy-conversion performance of the wind fin and the degree to which its performance could be enhanced through basic designmore » improvements; (2) to determine how best to design the wind fin system to survive extreme winds; (3) to determine the cost-effectiveness of the best wind fin designs compared to state-of-the-art wind turbines; and (4) to develop conclusions about the overall technical feasibility of the wind fin system. Project work involved extensive computer modeling, wind-tunnel testing with small models, and testing of bench-scale models in a wind tunnel and outdoors in the wind. This project determined that the wind fin approach is technically feasible and likely to be commercially viable. Project results suggest that this new technology has the potential to harvest wind energy at approximately half the system cost of wind turbines in the 10kW range. Overall, the project demonstrated that the wind fin technology has the potential to increase the economic viability of small wind-power generation. In addition, it has the potential to eliminate lethality to birds and bats, overcome public objections to the aesthetics of wind-power machines, and significantly expand wind-power’s contribution to the national energy supply.« less

  6. 13 CFR 306.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.1 Purpose and scope. (a) Local and National Technical Assistance Investments may: (1) Determine the causes... business. (c) EDA may identify specific training, research or technical assistance Projects it will fund...

  7. 11 CFR 9033.12 - Production of computerized information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...

  8. 11 CFR 9033.12 - Production of computerized information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...

  9. 11 CFR 9033.12 - Production of computerized information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...

  10. Reformation of Regulatory Technical Standards for Nuclear Power Generation Equipments in Japan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mikio Kurihara; Masahiro Aoki; Yu Maruyama

    2006-07-01

    Comprehensive reformation of the regulatory system has been introduced in Japan in order to apply recent technical progress in a timely manner. 'The Technical Standards for Nuclear Power Generation Equipments', known as the Ordinance No.622) of the Ministry of International Trade and Industry, which is used for detailed design, construction and operating stage of Nuclear Power Plants, was being modified to performance specifications with the consensus codes and standards being used as prescriptive specifications, in order to facilitate prompt review of the Ordinance with response to technological innovation. The activities on modification were performed by the Nuclear and Industrial Safetymore » Agency (NISA), the regulatory body in Japan, with support of the Japan Nuclear Energy Safety Organization (JNES), a technical support organization. The revised Ordinance No.62 was issued on July 1, 2005 and is enforced from January 1 2006. During the period from the issuance to the enforcement, JNES carried out to prepare enforceable regulatory guide which complies with each provisions of the Ordinance No.62, and also made technical assessment to endorse the applicability of consensus codes and standards, in response to NISA's request. Some consensus codes and standards were re-assessed since they were already used in regulatory review of the construction plan submitted by licensee. Other consensus codes and standards were newly assessed for endorsement. In case that proper consensus code or standards were not prepared, details of regulatory requirements were described in the regulatory guide as immediate measures. At the same time, appropriate standards developing bodies were requested to prepare those consensus code or standards. Supplementary note which provides background information on the modification, applicable examples etc. was prepared for convenience to the users of the Ordinance No. 62. This paper shows the activities on modification and the results, following the NISA's presentation at ICONE-13 that introduced the framework of the performance specifications and the modification process of the Ordinance NO. 62. (authors)« less

  11. A stochastic frontier analysis of technical efficiency of fish cage culture in Peninsular Malaysia.

    PubMed

    Islam, Gazi Md Nurul; Tai, Shzee Yew; Kusairi, Mohd Noh

    2016-01-01

    Cage culture plays an important role in achieving higher output and generating more export earnings in Malaysia. However, the cost of fingerlings, feed and labour have increased substantially for cage culture in the coastal areas in Peninsular Malaysia. This paper uses farm level data gathered from Manjung, Perak and Kota Tinggi, Johor to investigate the technical efficiency of brackish water fish cage culture using the stochastic frontier approach. The technical efficiency was estimated and specifically the factors affecting technical inefficiencies of fish cage culture system in Malaysia was investigated. On average, 37 percent of the sampled fish cage farms are technically efficient. The results suggest very high degrees of technical inefficiency exist among the cage culturists. This implies that great potential exists to increase fish production through improved efficiency in cage culture management in Peninsular Malaysia. The results indicate that farmers obtained grouper fingerlings from other neighboring countries due to scarcity of fingerlings from wild sources. The cost of feeding for grouper (Epinephelus fuscoguttatus) requires relatively higher costs compared to seabass (Lates calcarifer) production in cage farms in the study areas. Initiatives to undertake extension programmes at the farm level are needed to help cage culturists in utilizing their resources more efficiently in order to substantially enhance their fish production.

  12. NREL Partners with Technical University of Denmark on Renewable Energy

    Science.gov Websites

    System | Energy Systems Integration Facility | NREL Technical University of Denmark NREL Partners with Technical University of Denmark on Renewable Energy System NREL is working in partnership with the Technical University of Denmark for the Centre for IT-Intelligent Energy Systems in Cities

  13. Understanding critical barriers to implementing a clinical information system in a nursing home through the lens of a socio-technical perspective.

    PubMed

    Or, Calvin; Dohan, Michael; Tan, Joseph

    2014-09-01

    This paper addresses key barriers to implementing a clinical information system (CIS) in a Hong Kong nursing home setting, from a healthcare specific socio-technical perspective. Data was collected through field observations (n = 12) and semi-structured individual interviews (n = 18) of CIS stakeholders in a Hong Kong nursing home, and analyzed using the immersion/crystallization approach. Complex interactions relevant to our case were contextualized and interpreted within the perspective of the Sittig-Singh Healthcare Socio-Technical Framework (HSTF). Three broad clusters of implementation barriers from the eight HSTF dimensions were identified: (a) Infrastructure-based barriers, which relate to conflict between government regulations and system functional needs of users; lack of financial support; inconsistency between workflow, work policy, and procedures; and inadequacy of hardware-software infrastructural and technical support; (b) Process-based barriers, which relate to mismatch between the technology, existing work practice and workflow, and communication; low system speed, accessibility, and stability; deficient computer literacy; more experience in health care profession; clinical content inadequacy and unavailability; as well as poor system usefulness and user interface design; and (c) Outcome-based barriers, which relate to the lack of measurement and monitoring of system effectiveness. Two additional dimensions underlining the importance of the ability of a CIS to change are proposed to extend the Sittig-Singh HSTF. First, advocacy would promote the articulation and influence of changes in the system and subsequent outcomes by CIS stakeholders, and second, adaptability would ensure the ability of the system to adjust to emerging needs. The broad set of discovered implementation shortcomings expands prior research on why CIS can fail in nursing home settings. Moreover, our investigation offers a knowledge base and recommendations that can serve as a guide for future implementation strategies and policies in CIS initiatives.

  14. 10 CFR 61.13 - Technical analyses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Technical analyses. 61.13 Section 61.13 Energy NUCLEAR....13 Technical analyses. The specific technical information must also include the following analyses... air, soil, groundwater, surface water, plant uptake, and exhumation by burrowing animals. The analyses...

  15. A Cost-Effectiveness/Benefit Analysis Model for Postsecondary Vocational Programs. Technical Report.

    ERIC Educational Resources Information Center

    Kim, Jin Eun

    A cost-effectiveness/benefit analysis is defined as a technique for measuring the outputs of existing and new programs in relation to their specified program objectives, against the costs of those programs. In terms of its specific use, the technique is conceptualized as a systems analysis method, an evaluation method, and a planning tool for…

  16. 75 FR 75059 - Mandatory Reporting of Greenhouse Gases: Injection and Geologic Sequestration of Carbon Dioxide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... monitoring will achieve detection and quantification of CO 2 in the event surface leakage occurs. The UIC... leakage detection monitoring system or technical specifications should also be described in the MRV plan... of injected CO 2 or from another cause (e.g. natural variability). The MRV plan leakage detection and...

  17. Space and Missile Systems Center Standard: Technical Requirements for Electronic Parts, Materials, and Processes used in Space Vehicles

    DTIC Science & Technology

    2013-04-12

    DTL-38999 Connector, Electrical, Circular, Miniature, High Density, Quick Disconnect (Bayonet, Threaded , and Breach Coupling), Environment Resistant ...186 Table 1160-1. Resistance Tolerance and Required Derating...For MIL-DTL-5015 Connector, Electrical, Circular Threaded , AN Type, General Specification for MIL-H-6088G(1) Heat Treatment of Aluminum Alloys

  18. Value-Added Systems for Information and Instruction at Vocational-Technical Centers.

    ERIC Educational Resources Information Center

    Boyd, Betty Sue; Turner, Marsha K.

    Information resources can be considered a series of formal processes or activities by which the potential usefulness of specific information messages being processed is enhanced. These processes may add value to the information for the user. In order to increase the possibility that the information will be useful to recipients and users,…

  19. A study of how unmanned aircraft systems can support the Kansas Department of Transportation's efforts to improve efficiency, safety, and cost reduction : technical summary.

    DOT National Transportation Integrated Search

    2016-08-01

    The goal of this research is to provide a justified recommendation to the Kansas Department of Transportation : (KDOT) on whether or not it is beneficial to implement UAS into routine operations, as well as advice on : specific UAS equipment that bes...

  20. Technical Report from Grant Recipient - City of Redlands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giorgianni, Kathleen Margaret

    2016-05-26

    The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system).

  1. Theories of Memory and the Problems of Development: Activity, Growth, and Knowledge. Technical Report No. 51.

    ERIC Educational Resources Information Center

    Brown, Ann L.

    The first section of this report examines, from a developmental perspective, the major theoretical positions dominating the literature on adult cognition. Two criteria are considered. First, how compatible are the theories with the notion that thinking systems develop within specific environments? Second, what are the implicit or explicit…

  2. Closed Circuit TV Surveillance Systems in Educational Buildings: Crime Prevention in Schools. Building Bulletin 75.

    ERIC Educational Resources Information Center

    Whitehouse, B.; Patel, M.; Gofton, K.

    Recent years have shown an increase in arson, theft, and vandalism committed in educational facilities resulting in a need for managers to formulate security policies. This document provides technical advice and guidance on policy for the design, specification, installation, maintenance, operation, and management of closed circuit TV (CCTV)…

  3. Synthesis of Porous Carbon Monoliths Using Hard Templates.

    PubMed

    Klepel, Olaf; Danneberg, Nina; Dräger, Matti; Erlitz, Marcel; Taubert, Michael

    2016-03-21

    The preparation of porous carbon monoliths with a defined shape via template-assisted routes is reported. Monoliths made from porous concrete and zeolite were each used as the template. The porous concrete-derived carbon monoliths exhibited high gravimetric specific surface areas up to 2000 m²·g -1 . The pore system comprised macro-, meso-, and micropores. These pores were hierarchically arranged. The pore system was created by the complex interplay of the actions of both the template and the activating agent as well. On the other hand, zeolite-made template shapes allowed for the preparation of microporous carbon monoliths with a high volumetric specific surface area. This feature could be beneficial if carbon monoliths must be integrated into technical systems under space-limited conditions.

  4. Synthesis of Porous Carbon Monoliths Using Hard Templates

    PubMed Central

    Klepel, Olaf; Danneberg, Nina; Dräger, Matti; Erlitz, Marcel; Taubert, Michael

    2016-01-01

    The preparation of porous carbon monoliths with a defined shape via template-assisted routes is reported. Monoliths made from porous concrete and zeolite were each used as the template. The porous concrete-derived carbon monoliths exhibited high gravimetric specific surface areas up to 2000 m2·g−1. The pore system comprised macro-, meso-, and micropores. These pores were hierarchically arranged. The pore system was created by the complex interplay of the actions of both the template and the activating agent as well. On the other hand, zeolite-made template shapes allowed for the preparation of microporous carbon monoliths with a high volumetric specific surface area. This feature could be beneficial if carbon monoliths must be integrated into technical systems under space-limited conditions. PMID:28773338

  5. Generation and validation of PAX7 reporter lines from human iPS cells using CRISPR/Cas9 technology.

    PubMed

    Wu, Jianbo; Hunt, Samuel D; Xue, Haipeng; Liu, Ying; Darabi, Radbod

    2016-03-01

    Directed differentiation of iPS cells toward various tissue progenitors has been the focus of recent research. Therefore, generation of tissue-specific reporter iPS cell lines provides better understanding of developmental stages in iPS cells. This technical report describes an efficient strategy for generation and validation of knock-in reporter lines in human iPS cells using the Cas9-nickase system. Here, we have generated a knock-in human iPS cell line for the early myogenic lineage specification gene of PAX7. By introduction of site-specific double-stranded breaks (DSB) in the genomic locus of PAX7 using CRISPR/Cas9 nickase pairs, a 2A-GFP reporter with selection markers has been incorporated before the stop codon of the PAX7 gene at the last exon. After positive and negative selection, single cell-derived human iPS clones have been isolated and sequenced for in-frame positioning of the reporter construct. Finally, by using a nuclease-dead Cas9 activator (dCas9-VP160) system, the promoter region of PAX7 has been targeted for transient gene induction to validate the GFP reporter activity. This was confirmed by flow cytometry analysis and immunostaining for PAX7 and GFP. This technical report provides a practical guideline for generation and validation of knock-in reporters using CRISPR/Cas9 system. Published by Elsevier B.V.

  6. Superfund Site Information

    EPA Pesticide Factsheets

    This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, which was amended by the Superfund Amendments and Reauthorization Act (SARA) in 1986. The Superfund Enterprise Management System (SEMS) contains basic site description, location, schedule of activities, enforcement and settlement data, contaminants and selected remedy and much more, as well as the records that clearly document site decisions. This asset also includes sampling data and lab results (CLPSS, EDDs), redevelopment and technical assistance case studies, site reuse and land revitalization information, EPAOSC.net information, Superfund Technical Assistance Grants information, site management information records (RODs, Remediation plans, cleanup directives), contract management information, and more.Superfund site management information can also be found in agency wide systems such as EAS and COMPASS.

  7. [Robot-assisted surgery in the head and neck region].

    PubMed

    Hoffmann, T K; Friedrich, D T; Schuler, P J

    2016-09-01

    Robot-assisted surgery (RAS) in the head and neck region is believed to have a large potential for the improvement of patient care. Several systems with a master-slave setup are already in routine clinical use, particularly for oncologic surgery. Although specific patient groups may benefit from RAS, there is a lack of randomized clinical studies validating the advantages of these new technological systems in comparison to the existing standard procedures. On the other hand, RAS in the head and neck region is being constantly developed. Currently, the main limitations are the technical miniaturization of the tools and the loss of haptic feedback, as well as the high costs for acquisition and maintenance without financial reimbursement. In any case, the current generation of head and neck surgeons will face the technical, scientific, and ethical challenges of RAS.

  8. Small image laser range finder for planetary rover

    NASA Technical Reports Server (NTRS)

    Wakabayashi, Yasufumi; Honda, Masahisa; Adachi, Tadashi; Iijima, Takahiko

    1994-01-01

    A variety of technical subjects need to be solved before planetary rover navigation could be a part of future missions. The sensors which will perceive terrain environment around the rover will require critical development efforts. The image laser range finder (ILRF) discussed here is one of the candidate sensors because of its advantage in providing range data required for its navigation. The authors developed a new compact-sized ILRF which is a quarter of the size of conventional ones. Instead of the current two directional scanning system which is comprised of nodding and polygon mirrors, the new ILRF is equipped with the new concept of a direct polygon mirror driving system, which successfully made its size compact to accommodate the design requirements. The paper reports on the design concept and preliminary technical specifications established in the current development phase.

  9. Range Flight Safety Requirements

    NASA Technical Reports Server (NTRS)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  10. Defining Requirements and Related Methods for Designing Sensorized Garments.

    PubMed

    Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo

    2016-05-26

    Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user's age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors-also influencing user comfort-are elasticity and washability, while more technical properties are the stability of the chemical agents' effects for preserving the sensors' efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability.

  11. Composite Socio-Technical Systems: A Method for Social Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Yingchen; He, Fulin; Hao, Jun

    In order to model and study the interactions between social on technical systems, a systemic method, namely the composite socio-technical systems (CSTS), is proposed to incorporate social systems, technical systems and the interaction mechanism between them. A case study on University of Denver (DU) campus grid is presented in paper to demonstrate the application of the proposed method. In the case study, the social system, technical system, and the interaction mechanism are defined and modelled within the framework of CSTS. Distributed and centralized control and management schemes are investigated, respectively, and numerical results verifies the feasibility and performance of themore » proposed composite system method.« less

  12. 47 CFR 73.319 - FM multiplex subcarrier technical standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false FM multiplex subcarrier technical standards. 73... SERVICES RADIO BROADCAST SERVICES FM Broadcast Stations § 73.319 FM multiplex subcarrier technical standards. (a) The technical specifications in this Section apply to all transmissions of FM multiplex...

  13. A domain-specific analysis system for examining nuclear reactor simulation data for light-water and sodium-cooled fast reactors

    DOE PAGES

    Billings, Jay Jay; Deyton, Jordan H.; Forest Hull, S.; ...

    2015-07-17

    Building new fission reactors in the United States presents many technical and regulatory challenges. Chief among the technical challenges is the need to share and present results from new high- fidelity, high- performance simulations in an easily consumable way. In light of the modern multi-scale, multi-physics simulations can generate petabytes of data, this will require the development of new techniques and methods to reduce the data to familiar quantities of interest with a more reasonable resolution and size. Furthermore, some of the results from these simulations may be new quantities for which visualization and analysis techniques are not immediately availablemore » in the community and need to be developed. Our paper describes a new system for managing high-performance simulation results in a domain-specific way that naturally exposes quantities of interest for light water and sodium-cooled fast reactors. It enables easy qualitative and quantitative comparisons between simulation results with a graphical user interface and cross-platform, multi-language input- output libraries for use by developers to work with the data. One example comparing results from two different simulation suites for a single assembly in a light-water reactor is presented along with a detailed discussion of the system s requirements and design.« less

  14. Beyond a series of security nets: Applying STAMP & STPA to port security

    DOE PAGES

    Williams, Adam D.

    2015-11-17

    Port security is an increasing concern considering the significant role of ports in global commerce and today’s increasingly complex threat environment. Current approaches to port security mirror traditional models of accident causality -- ‘a series of security nets’ based on component reliability and probabilistic assumptions. Traditional port security frameworks result in isolated and inconsistent improvement strategies. Recent work in engineered safety combines the ideas of hierarchy, emergence, control and communication into a new paradigm for understanding port security as an emergent complex system property. The ‘System-Theoretic Accident Model and Process (STAMP)’ is a new model of causality based on systemsmore » and control theory. The associated analysis process -- System Theoretic Process Analysis (STPA) -- identifies specific technical or procedural security requirements designed to work in coordination with (and be traceable to) overall port objectives. This process yields port security design specifications that can mitigate (if not eliminate) port security vulnerabilities related to an emphasis on component reliability, lack of coordination between port security stakeholders or economic pressures endemic in the maritime industry. As a result, this article aims to demonstrate how STAMP’s broader view of causality and complexity can better address the dynamic and interactive behaviors of social, organizational and technical components of port security.« less

  15. Beyond a series of security nets: Applying STAMP & STPA to port security

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Adam D.

    Port security is an increasing concern considering the significant role of ports in global commerce and today’s increasingly complex threat environment. Current approaches to port security mirror traditional models of accident causality -- ‘a series of security nets’ based on component reliability and probabilistic assumptions. Traditional port security frameworks result in isolated and inconsistent improvement strategies. Recent work in engineered safety combines the ideas of hierarchy, emergence, control and communication into a new paradigm for understanding port security as an emergent complex system property. The ‘System-Theoretic Accident Model and Process (STAMP)’ is a new model of causality based on systemsmore » and control theory. The associated analysis process -- System Theoretic Process Analysis (STPA) -- identifies specific technical or procedural security requirements designed to work in coordination with (and be traceable to) overall port objectives. This process yields port security design specifications that can mitigate (if not eliminate) port security vulnerabilities related to an emphasis on component reliability, lack of coordination between port security stakeholders or economic pressures endemic in the maritime industry. As a result, this article aims to demonstrate how STAMP’s broader view of causality and complexity can better address the dynamic and interactive behaviors of social, organizational and technical components of port security.« less

  16. [Technical specification for clinical application of critical ultrasonography].

    PubMed

    Yin, M G; Wang, X T; Liu, D W; Chao, Y G; Guan, X D; Kang, Y; Yan, J; Ma, X C; Tang, Y Q; Hu, Z J; Yu, K J; Chen, D C; Ai, Y H; Zhang, L N; Zhang, H M; Wu, J; Liu, L X; Zhu, R; He, W; Zhang, Q; Ding, X; Li, L; Li, Y; Liu, H T; Zeng, Q B; Si, X; Chen, H; Zhang, J W; Xu, Q H; Chen, W J; Chen, X K; Huang, D Z; Cai, S H; Shang, X L; Guan, J; Du, J; Zhao, L; Wang, M J; Cui, S; Wang, X M; Zhou, R; Zeng, X Y; Wang, Y P; Lyu, L W; Zhu, W H; Zhu, Y; Duan, J; Yang, J; Yang, H

    2018-06-01

    Critical ultrasonography(CUS) is different from the traditional diagnostic ultrasound, the examiner and interpreter of the image are critical care medicine physicians. The core content of CUS is to evaluate the pathophysiological changes of organs and systems and etiology changes. With the idea of critical care medicine as the soul, it can integrate the above information and clinical information, bedside real-time diagnosis and titration treatment, and evaluate the therapeutic effect so as to improve the outcome. CUS is a traditional technique which is applied as a new application method. The consensus of experts on critical ultrasonography in China released in 2016 put forward consensus suggestions on the concept, implementation and application of CUS. It should be further emphasized that the accurate and objective assessment and implementation of CUS requires the standardization of ultrasound image acquisition and the need to establish a CUS procedure. At the same time, the standardized training for CUS accepted by critical care medicine physicians requires the application of technical specifications, and the establishment of technical specifications is the basis for the quality control and continuous improvement of CUS. Chinese Critical Ultrasound Study Group and Critical Hemodynamic Therapy Collabration Group, based on the rich experience of clinical practice in critical care and research, combined with the essence of CUS, to learn the traditional ultrasonic essence, established the clinical application technical specifications of CUS, including in five parts: basic view and relevant indicators to obtain in CUS; basic norms for viscera organ assessment and special assessment; standardized processes and systematic inspection programs; examples of CUS applications; CUS training and the application of qualification certification. The establishment of applied technology standard is helpful for standardized training and clinical correct implementation. It is helpful for clinical evaluation and correct guidance treatment, and is also helpful for quality control and continuous improvement of CUS application.

  17. Expert Meeting: Optimized Heating Systems Using Condensing Boilers and Baseboard Convectors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arena, L.

    2013-01-01

    On August 11, 2011, in Denver, CO, a Building America Expert Meeting was held in conjunction with the Building America Residential Energy Efficiency Technical Update Meeting, to review and discuss results and future plans for research to improve the performance of hydronic heating systems using condensing boilers and baseboard convectors. A meeting objective was to provide an opportunity for other Building America teams and industry experts to provide feedback and specific suggestions for the planned research.

  18. Reliability of image-free navigation to monitor lower-limb alignment.

    PubMed

    Pearle, Andrew D; Goleski, Patrick; Musahl, Volker; Kendoff, Daniel

    2009-02-01

    Proper alignment of the mechanical axis of the lower limb is the principal goal of a high tibial osteotomy. A well-accepted and relevant technical specification is the coronal plane lower-limb alignment. Target values for coronal plane alignment after high tibial osteotomy include 2 degrees of overcorrection, while tolerances for this specification have been established as 2 degrees to 4 degrees. However, the role of axial plane and sagittal plane realignment after high tibial osteotomy is poorly understood; consequently, targets and tolerance for this technical specification remain undefined. This article reviews the literature concerning the reliability and precision of navigation in monitoring the clinically relevant specification of lower-limb alignment in high tibial osteotomy. We conclude that image-free navigation registration may be clinically useful for intraoperative monitoring of the coronal plane only. Only fair and poor results for the axial and sagittal planes can be obtained by image-free navigation systems. In the future, combined image-based data, such as those from radiographs, magnetic resonance imaging, and gait analysis, may be used to help to improve the accuracy and reproducibility of quantitative intraoperative monitoring of lower-limb alignment.

  19. Technical Concept Document. Central Archive for Reusable Defense Software (CARDS)

    DTIC Science & Technology

    1994-02-28

    FeNbry 1994 INFORMAL TECHNICAL REPORT For The SOFTWARE TECHNOLOGY FOR ADAPTABLE, RELIABLE SYSTEMS (STARS) Technical Concept Document Central Archive for...February 1994 INFORMAL TECHNICAL REPORT For The SOFTWARE TECHNOLOGY FOR ADAPTABLE, RELIABLE SYSTEMS (STARS) Technical Concept Document Central Archive...accordance with the DFARS Special Works Clause Developed by: This document, developed under the Software Technology for Adaptable, Reliable Systems

  20. Designing Observation and Modeling Systems to Inform Decisions and Policies on Freshwater Objectives in New Zealand

    NASA Astrophysics Data System (ADS)

    Baisden, W. T.; Ellis, T.; Rissman, C.; Moore, C.; Matthews, A.

    2016-12-01

    Declines in New Zealand's freshwater quality have led to legislation - the 2014 National Policy Statement on Freshwater Management (NPS-FM) - which requires regional governments to set "objectives" and design policies accordingly. In most regions, increases in freshwater contaminants are derived largely from intensifying agriculture and come as nitrogen, phosphorous or sediment, or a combination thereof. Here, the development and application of N and O isotopes as natural tracers for nitrate is examined as a case study, in the context of a wider hierarchy of observations such as N concentrations, flow and broader hydrochemistry used for NPS-FM implementation. The analysis of N and O isotopes in nitrate provides specific information on sources and removal processes that cannot be obtained by other measurements. Yet, despite considerable development of the technical methodology and environment-specific interpretation, application of measurements has faced barriers. Many may be typical of science in a small advanced nation with a population of 4.5 million, but others are unique due to New Zealand's limited rural population base and large diversity in physical geography, as well as a unique economic reliance on highly productive pastoral agricultural systems. Seventeen different regional governments are empowered to regulate in ways consistent with local consultation and democracy within their catchment boundaries, but with limited resources to align highly technical observational data to policies and decisions, as well as supporting models. The resulting gaps in communication and technical capability combine with a diversity of approaches to pose both challenges and opportunities for development and application of hierarchical observation systems. Success appears to lie in ensuring decision frameworks can be `mapped', so that different frameworks can be compared, and the benefits of sophisticated observations understood directly in relation to influence on regional policy and on-farm management decisions.

  1. Technical Support Documents Used to Develop the Chesapeake Bay TMDL

    EPA Pesticide Factsheets

    The Chesapeake Bay TMDL development was supported by several technical documents for water quality standards and allocation methodologies specific to the Chesapeake Bay. This page provides the technical support documents.

  2. Identification of Crew-Systems Interactions and Decision Related Trends

    NASA Technical Reports Server (NTRS)

    Jones, Sharon Monica; Evans, Joni K.; Reveley, Mary S.; Withrow, Colleen A.; Ancel, Ersin; Barr, Lawrence

    2013-01-01

    NASA Vehicle System Safety Technology (VSST) project management uses systems analysis to identify key issues and maintain a portfolio of research leading to potential solutions to its three identified technical challenges. Statistical data and published safety priority lists from academic, industry and other government agencies were reviewed and analyzed by NASA Aviation Safety Program (AvSP) systems analysis personnel to identify issues and future research needs related to one of VSST's technical challenges, Crew Decision Making (CDM). The data examined in the study were obtained from the National Transportation Safety Board (NTSB) Aviation Accident and Incident Data System, Federal Aviation Administration (FAA) Accident/Incident Data System and the NASA Aviation Safety Reporting System (ASRS). In addition, this report contains the results of a review of safety priority lists, information databases and other documented references pertaining to aviation crew systems issues and future research needs. The specific sources examined were: Commercial Aviation Safety Team (CAST) Safety Enhancements Reserved for Future Implementation (SERFIs), Flight Deck Automation Issues (FDAI) and NTSB Most Wanted List and Open Recommendations. Various automation issues taxonomies and priority lists pertaining to human factors, automation and flight design were combined to create a list of automation issues related to CDM.

  3. Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange

    NASA Technical Reports Server (NTRS)

    Haynes, Brian D.

    2015-01-01

    Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange is a two-year research effort to visualize the U. S. aviation industry at a point 50 years in the future, and to define potential communication solutions to meet those future data exchange needs. The research team, led by XCELAR, was tasked with identifying future National Airspace System (NAS) scenarios, determining requirements and functions (including gaps), investigating technical and business issues for air, ground, & air-to-ground interactions, and reporting on the results. The project was conducted under technical direction from NASA and in collaboration with XCELAR's partner, National Institute of Aerospace, and NASA technical representatives. Parallel efforts were initiated to define the information exchange functional needs of the future NAS, and specific communication link technologies to potentially serve those needs. Those efforts converged with the mapping of each identified future NAS function to potential enabling communication solutions; those solutions were then compared with, and ranked relative to, each other on a technical basis in a structured analysis process. The technical solutions emerging from that process were then assessed from a business case perspective to determine their viability from a real-world adoption and deployment standpoint. The results of that analysis produced a proposed set of future solutions and most promising candidate technologies. Gap analyses were conducted at two points in the process, the first examining technical factors, and the second as part of the business case analysis. In each case, no gaps or unmet needs were identified in applying the solutions evaluated to the requirements identified. The future communication solutions identified in the research comprise both specific link technologies and two enabling technologies that apply to most or all specific links. As a result, the research resulted in a new analysis approach, viewing the underlying architecture of ground-air and air-air communications as a whole, rather than as simple "link to function" paired solutions. For the business case analysis, a number of "reference architectures" were developed for both the future technologies and the current systems, based on three typical configurations of current aircraft. Current and future costs were assigned, and various comparisons made between the current and future architectures. In general, it was assumed that if a future architecture offers lower cost than the current typical architecture, while delivering equivalent or better performance, it is likely that the future solution will gain industry acceptance. Conversely, future architectures presenting higher costs than their current counterparts must present a compelling benefit case in other areas or risk a lack of industry acceptance. The business case analysis consistently indicated lower costs for the proposed future architectures, and in most cases, significantly so. The proposed future solutions were found to offer significantly greater functionality, flexibility, and growth potential over time, at lower cost, than current systems. This was true for overall, fleet-wide equipage for domestic and oceanic air carriers, as well as for single, General Aviation (GA) aircraft. The overall research results indicate that all identified requirements can be met by the proposed solutions with significant capacity for future growth. Results also illustrate that the majority of the future communication needs can be met using currently allocated aviation RF spectrum, if used in more effective ways than it is today. A combination of such optimized aviation-specific links and commercial communication systems meets all identified needs for the 50-year future and beyond, with the caveat that a new, overall function will be needed to manage all information exchange, individual links, security, cost, and other factors. This function was labeled "Delivery Manager" (DM) within this research. DM employs a distributed client/server architecture, for both airborne and ground communications architectures. Final research results included identifying the most promising candidate technologies for the future system, conclusions and recommendations, and identifying areas where further research should be considered.

  4. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  5. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  6. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  7. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  8. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  9. Career and Technical Education Administration: Requirements, Certification/Licensure, and Preparation

    ERIC Educational Resources Information Center

    Zirkle, Christopher J.; Jeffery, Jeremy O.

    2017-01-01

    The current climate of career and technical administration requirements in all 50 states was detailed and explored. An increasing number of states are not requiring specific career-technical administration certification/licensure in order to oversee secondary career and technical education (CTE) programs, with more states moving towards a general…

  10. 9 CFR 351.19 - Refusal of certification for specific lots.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Remedies... lot of technical animal fat is ineligible for certification under § 351.3, or any materials to be used in a lot of technical animal fat would make the technical animal fat ineligible for such...

  11. 9 CFR 351.19 - Refusal of certification for specific lots.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Remedies... lot of technical animal fat is ineligible for certification under § 351.3, or any materials to be used in a lot of technical animal fat would make the technical animal fat ineligible for such...

  12. 9 CFR 351.19 - Refusal of certification for specific lots.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Remedies... lot of technical animal fat is ineligible for certification under § 351.3, or any materials to be used in a lot of technical animal fat would make the technical animal fat ineligible for such...

  13. 9 CFR 351.19 - Refusal of certification for specific lots.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Remedies... lot of technical animal fat is ineligible for certification under § 351.3, or any materials to be used in a lot of technical animal fat would make the technical animal fat ineligible for such...

  14. 22 CFR 126.17 - Exemption pursuant to the Defense Trade Cooperation Treaty between the United States and the...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; (ii) Technical data (including data packages, technical papers, manuals, presentations, specifications... person who receives defense articles, including technical data, but who does not have access to such... (other than technical data) shall be individually labeled with the appropriate identification detailed in...

  15. Development of ClearPEM-Sonic, a multimodal mammography system for PET and Ultrasound

    NASA Astrophysics Data System (ADS)

    Cucciati, G.; Auffray, E.; Bugalho, R.; Cao, L.; Di Vara, N.; Farina, F.; Felix, N.; Frisch, B.; Ghezzi, A.; Juhan, V.; Jun, D.; Lasaygues, P.; Lecoq, P.; Mensah, S.; Mundler, O.; Neves, J.; Paganoni, M.; Peter, J.; Pizzichemi, M.; Siles, P.; Silva, J. C.; Silva, R.; Tavernier, S.; Tessonnier, L.; Varela, J.

    2014-03-01

    ClearPEM-Sonic is an innovative imaging device specifically developed for breast cancer. The possibility to work in PEM-Ultrasound multimodality allows to obtain metabolic and morphological information increasing the specificity of the exam. The ClearPEM detector is developed to maximize the sensitivity and the spatial resolution as compared to Whole-Body PET scanners. It is coupled with a 3D ultrasound system, the SuperSonic Imagine Aixplorer that improves the specificity of the exam by providing a tissue elasticity map. This work describes the ClearPEM-Sonic project focusing on the technological developments it has required, the technical merits (and limits) and the first multimodal images acquired on a dedicated phantom. It finally presents selected clinical case studies that confirm the value of PEM information.

  16. Emerging from Resistance: The Origins of the Virginia Technical College System

    ERIC Educational Resources Information Center

    Hodges, Richard Allen

    2016-01-01

    The purpose of this study was to explore factors leading to the founding of the Virginia Technical College System (VTCS). These factors are observed primarily within the timeframe of 1954-1966. The Virginia Community College System (VCCS) evolved from the Technical College System, and began in 1964. Classes started at the first technical colleges…

  17. ENVRI PLUS: European initiative towards technical and research cultural solutions for across-disciplines accessible Research Infrastructure products

    NASA Astrophysics Data System (ADS)

    Asmi, A.; Kutsch, W. L.

    2015-12-01

    Environmental Research Infrastructures are often built as bottom-up initiatives to provide products for specific target group, which often is very discipline specific. However, the societal or environmental challenges are typically not concentrated on specific disciplines, and require usage of data sets from many RIs. ENVRI PLUS is an initiative where the European environmental RIs work together to provide common technical background (in physical observation technologies and in data products and descriptions) to make the RI products more usable to user groups outside of the original RI target groups. ENVRI PLUS also includes many policy and dissemination concentrated actions to make the RI operations coherent and understandable to both scientists and other potential users. The actions include building common technological capital of the RIs (physical and data-oriented), creating common access procedures (especially for cross-diciplinary access), developing ethical guidelines and related policies, distributing know-how between RIs and building common communication and collaboration system for European environmental RIs. All ENVRI PLUS products are free to use, e.g. for use of new or existing environmental RIs worldwide.

  18. Aircraft digital flight control technical review

    NASA Technical Reports Server (NTRS)

    Davenport, Otha B.; Leggett, David B.

    1993-01-01

    The Aircraft Digital Flight Control Technical Review was initiated by two pilot induced oscillation (PIO) incidents in the spring and summer of 1992. Maj. Gen. Franklin (PEO) wondered why the Air Force development process for digital flight control systems was not preventing PIO problems. Consequently, a technical review team was formed to examine the development process and determine why PIO problems continued to occur. The team was also to identify the 'best practices' used in the various programs. The charter of the team was to focus on the PIO problem, assess the current development process, and document the 'best practices.' The team reviewed all major USAF aircraft programs with digital flight controls, specifically, the F-15E, F-16C/D, F-22, F-111, C-17, and B-2. The team interviewed contractor, System Program Office (SPO), and Combined Test Force (CTF) personnel on these programs. The team also went to NAS Patuxent River to interview USN personnel about the F/A-18 program. The team also reviewed experimental USAF and NASA systems with digital flight control systems: X-29, X-31, F-15 STOL and Maneuver Technology Demonstrator (SMTD), and the Variable In-Flight Stability Test Aircraft (VISTA). The team also discussed the problem with other experts in the field including Ralph Smith and personnel from Calspan. The major conclusions and recommendations from the review are presented.

  19. Process spectroscopy in microemulsions—setup and multi-spectral approach for reaction monitoring of a homogeneous hydroformylation process

    NASA Astrophysics Data System (ADS)

    Meyer, K.; Ruiken, J.-P.; Illner, M.; Paul, A.; Müller, D.; Esche, E.; Wozny, G.; Maiwald, M.

    2017-03-01

    Reaction monitoring in disperse systems, such as emulsions, is of significant technical importance in various disciplines like biotechnological engineering, chemical industry, food science, and a growing number other technical fields. These systems pose several challenges when it comes to process analytics, such as heterogeneity of mixtures, changes in optical behavior, and low optical activity. Concerning this, online nuclear magnetic resonance (NMR) spectroscopy is a powerful technique for process monitoring in complex reaction mixtures due to its unique direct comparison abilities, while at the same time being non-invasive and independent of optical properties of the sample. In this study the applicability of online-spectroscopic methods on the homogeneously catalyzed hydroformylation system of 1-dodecene to tridecanal is investigated, which is operated in a mini-plant scale at Technische Universität Berlin. The design of a laboratory setup for process-like calibration experiments is presented, including a 500 MHz online NMR spectrometer, a benchtop NMR device with 43 MHz proton frequency as well as two Raman probes and a flow cell assembly for an ultraviolet and visible light (UV/VIS) spectrometer. Results of high-resolution online NMR spectroscopy are shown and technical as well as process-specific problems observed during the measurements are discussed.

  20. Control Systems with Normalized and Covariance Adaptation by Optimal Control Modification

    NASA Technical Reports Server (NTRS)

    Nguyen, Nhan T. (Inventor); Burken, John J. (Inventor); Hanson, Curtis E. (Inventor)

    2016-01-01

    Disclosed is a novel adaptive control method and system called optimal control modification with normalization and covariance adjustment. The invention addresses specifically to current challenges with adaptive control in these areas: 1) persistent excitation, 2) complex nonlinear input-output mapping, 3) large inputs and persistent learning, and 4) the lack of stability analysis tools for certification. The invention has been subject to many simulations and flight testing. The results substantiate the effectiveness of the invention and demonstrate the technical feasibility for use in modern aircraft flight control systems.

  1. Methods for increasing noise immunity of radio electronic systems with redundancy

    NASA Astrophysics Data System (ADS)

    Orlov, P. E.; Medvedev, A. V.; Sharafutdinov, V. R.; Gazizov, T. R.; Ubaichin, A. V.

    2018-05-01

    The idea of increasing the noise immunity of radioelectronic systems with redundancy is presented. Specific technical solutions based on this idea of modal redundancy are described. An estimation of noise immunity improvement was performed by the example of implementation of modal redundancy with the broad-side electromagnetic coupling for a printed circuit board of the digital signal processing unit for an autonomous navigation system of a spacecraft. It is shown that the implementation of modal redundancy can provide an attenuation coefficient for the interference signal up to 12 dB.

  2. Development of a Software Safety Process and a Case Study of Its Use

    NASA Technical Reports Server (NTRS)

    Knight, J. C.

    1996-01-01

    Research in the year covered by this reporting period has been primarily directed toward: continued development of mock-ups of computer screens for operator of a digital reactor control system; development of a reactor simulation to permit testing of various elements of the control system; formal specification of user interfaces; fault-tree analysis including software; evaluation of formal verification techniques; and continued development of a software documentation system. Technical results relating to this grant and the remainder of the principal investigator's research program are contained in various reports and papers.

  3. Intelligent hypertext systems for aerospace engineering applications

    NASA Technical Reports Server (NTRS)

    Lo, Ching F.

    1989-01-01

    This paper is a progress report on the utilization of AI technology for assisting users locating and understanding technical information in manuals used for planning and conducting wind tunnel test. The specific goal is to create an Intelligent Hypertext System (IHS) for wind tunnel testing which combines the computerized manual in the form of hypertext and an advisory system that stores experts' knowledge and experiences. A prototype IHS for conducting transonic wind tunnel testing has been constructed with limited knowledge base. The prototype is being evaluated by potential users.

  4. Management of technical date in Nihon Doro kodan

    NASA Astrophysics Data System (ADS)

    Hanada, Jun'ichi

    Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.

  5. BASINS Technical Notes

    EPA Pesticide Factsheets

    EPA has developed several technical notes that provide in depth information on a specific function in BASINS. Technical notes can be used to answer questions users may have, or to provide additional information on the application of features in BASINS.

  6. Digital control and data acquisition for high-value GTA welding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George, T.G.; Franco-Ferreira, E.A.

    1993-10-01

    Electric power for the Cassini space probe wig be provided by radioisotope thermoelectric generators (RTGs) thermally driven by General-Purpose Heat Source (GPHS) modules. Each GPHS module contains four, 150-g, pellets of {sup 238}PuO{sub 2}, and each of the four pellets is encapsulated within a thin-wall iridium-alloy shell. GTA girth welding of these capsules is performed at Los Alamos National Laboratory (LANL) on an automated, digitally-controlled welding system. This paper discusses baseline design considerations for system automation and strategies employed to maximize process yield, improve process consistency, and generate required quality assurance information. Design of the automated girth welding system wasmore » driven by a number of factors which militated for precise parametric control and data acquisition. Foremost among these factors was the extraordinary value of the capsule components. In addition, DOE order 5700.6B, which took effect on 23 September 1986, required that all operations adhere to strict levels of process quality assurance. A detailed technical specification for the GPHS welding system was developed on the basis of a joint Lanl/Westinghouse Savannah River Company (WSRC) design effort. After a competitive bidding process, Jetline Engineering, Inc., of Irvine, California, was selected as the system manufacturer. During the period over which four identical welding systems were fabricated, very close liason was maintained between the LANL/WSRC technical representatives and the vendor. The level of rapport was outstanding, and the end result was the 1990 delivery of four systems that met or exceeded all specification requirements.« less

  7. EVA tools and equipment reference book

    NASA Technical Reports Server (NTRS)

    Fullerton, R. K.

    1993-01-01

    This document contains a mixture of tools and equipment used throughout the space shuttle-based extravehicular activity (EVA) program. Promising items which have reached the prototype stage of development are also included, but should not be considered certified ready for flight. Each item is described with a photo, a written discussion, technical specifications, dimensional drawings, and points of contact for additional information. Numbers on the upper left-hand corner of each photo may be used to order specific pictures from NASA and contractor photo libraries. Points of contact were classified as either operational or technical. An operational contact is an engineer from JSC Mission Operations Directorate who is familiar with the basic function and on-orbit use of the tool. A technical contact would be the best source of detailed technical specifications and is typically the NASA subsystem manager. The technical information table for each item uses the following terms to describe the availability or status of each hardware item: Standard - Flown on every mission as standard manifest; Flight specific - Potentially available for flight, not flown every mission (flight certification cannot be guaranteed and recertification may be required); Reference only - Item no longer in active inventory or not recommended for future use, some items may be too application-specific for general use; and Developmental - In the prototype stage only and not yet available for flight. The current availability and certification of any flight-specific tool should be verified with the technical point of contact. Those tools built and fit checked for Hubble Space Telescope maintenance are program dedicated and are not available to other customers. Other customers may have identical tools built from the existing, already certified designs as an optional service.

  8. Technical specifications for mechanical recycling of agricultural plastic waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Briassoulis, D., E-mail: briassou@aua.gr; Hiskakis, M.; Babou, E.

    Highlights: • Technical specifications for agricultural plastic wastes (APWs) recycling proposed. • Specifications are the base for best economical and environmental APW valorisation. • Analysis of APW reveals inherent characteristics and constraints of APW streams. • Thorough survey on mechanical recycling processes and industry as it applies to APW. • Specifications for APW recycling tested, adjusted and verified through pilot trials. - Abstract: Technical specifications appropriate for the recycling of agricultural plastic wastes (APWs), widely accepted by the recycling industry were developed. The specifications establish quality standards to be met by the agricultural plastics producers, users and the agricultural plasticmore » waste management chain. They constitute the base for the best economical and environmental valorisation of the APW. The analysis of the APW streams conducted across Europe in the framework of the European project “LabelAgriWaste” revealed the inherent characteristics of the APW streams and the inherent constraints (technical or economical) of the APW. The APW stream properties related to its recycling potential and measured during pilot trials are presented and a subsequent universally accepted simplified and expanded list of APW recycling technical specifications is proposed and justified. The list includes two sets of specifications, applied to two different quality categories of recyclable APW: one for pellet production process (“Quality I”) and another one for plastic profile production process (“Quality II”). Parameters that are taken into consideration in the specifications include the APW physical characteristics, contamination, composition and degradation. The proposed specifications are focused on polyethylene based APW that represents the vast majority of the APW stream. However, the specifications can be adjusted to cover also APW of different materials (e.g. PP or PVC) that are found in very small quantities in protected cultivations in Europe. The adoption of the proposed specifications could transform this waste stream into a labelled commodity traded freely in the market and will constitute the base for the best economical and environmental valorisation of the APW.« less

  9. U.S. Army weapon systems human-computer interface style guide. Version 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Avery, L.W.; O`Mara, P.A.; Shepard, A.P.

    1997-12-31

    A stated goal of the US Army has been the standardization of the human computer interfaces (HCIs) of its system. Some of the tools being used to accomplish this standardization are HCI design guidelines and style guides. Currently, the Army is employing a number of HCI design guidance documents. While these style guides provide good guidance for the command, control, communications, computers, and intelligence (C4I) domain, they do not necessarily represent the more unique requirements of the Army`s real time and near-real time (RT/NRT) weapon systems. The Office of the Director of Information for Command, Control, Communications, and Computers (DISC4),more » in conjunction with the Weapon Systems Technical Architecture Working Group (WSTAWG), recognized this need as part of their activities to revise the Army Technical Architecture (ATA), now termed the Joint Technical Architecture-Army (JTA-A). To address this need, DISC4 tasked the Pacific Northwest National Laboratory (PNNL) to develop an Army weapon systems unique HCI style guide, which resulted in the US Army Weapon Systems Human-Computer Interface (WSHCI) Style Guide Version 1. Based on feedback from the user community, DISC4 further tasked PNNL to revise Version 1 and publish Version 2. The intent was to update some of the research and incorporate some enhancements. This document provides that revision. The purpose of this document is to provide HCI design guidance for the RT/NRT Army system domain across the weapon systems subdomains of ground, aviation, missile, and soldier systems. Each subdomain should customize and extend this guidance by developing their domain-specific style guides, which will be used to guide the development of future systems within their subdomains.« less

  10. Application of infrared uncooled cameras in surveillance systems

    NASA Astrophysics Data System (ADS)

    Dulski, R.; Bareła, J.; Trzaskawka, P.; PiÄ tkowski, T.

    2013-10-01

    The recent necessity to protect military bases, convoys and patrols gave serious impact to the development of multisensor security systems for perimeter protection. One of the most important devices used in such systems are IR cameras. The paper discusses technical possibilities and limitations to use uncooled IR camera in a multi-sensor surveillance system for perimeter protection. Effective ranges of detection depend on the class of the sensor used and the observed scene itself. Application of IR camera increases the probability of intruder detection regardless of the time of day or weather conditions. It also simultaneously decreased the false alarm rate produced by the surveillance system. The role of IR cameras in the system was discussed as well as technical possibilities to detect human being. Comparison of commercially available IR cameras, capable to achieve desired ranges was done. The required spatial resolution for detection, recognition and identification was calculated. The simulation of detection ranges was done using a new model for predicting target acquisition performance which uses the Targeting Task Performance (TTP) metric. Like its predecessor, the Johnson criteria, the new model bounds the range performance with image quality. The scope of presented analysis is limited to the estimation of detection, recognition and identification ranges for typical thermal cameras with uncooled microbolometer focal plane arrays. This type of cameras is most widely used in security systems because of competitive price to performance ratio. Detection, recognition and identification range calculations were made, and the appropriate results for the devices with selected technical specifications were compared and discussed.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Hennen, Matthew J.; Zimmerman, Shon A.

    The study reported herein was conducted by the Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The PNNL and UW project managers were Drs. Thomas J. Carlson and John R. Skalski, respectively. The USACE technical lead was Mr. Brad Eppard. The study was designed to estimate dam passage survival and other performance measures at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System Biological Opinion (BiOp) and the 2008 Columbia Basin Fish Accords. The study is being documented in two types of reports:more » compliance and technical. A compliance report is delivered within 6 months of the completion of the field season and focuses on results of the performance metrics outlined in the 2008 BiOp and Fish Accords. A technical report is produced within the 18 months after field work, providing comprehensive documentation of a given study and results on route-specific survival estimates and fish passage distributions, which are not included in compliance reports. This technical report concerns the 2011 acoustic telemetry study at The Dalles Dam.« less

  12. Gene trap and gene inversion methods for conditional gene inactivation in the mouse

    PubMed Central

    Xin, Hong-Bo; Deng, Ke-Yu; Shui, Bo; Qu, Shimian; Sun, Qi; Lee, Jane; Greene, Kai Su; Wilson, Jason; Yu, Ying; Feldman, Morris; Kotlikoff, Michael I.

    2005-01-01

    Conditional inactivation of individual genes in mice using site-specific recombinases is an extremely powerful method for determining the complex roles of mammalian genes in developmental and tissue-specific contexts, a major goal of post-genomic research. However, the process of generating mice with recombinase recognition sequences placed at specific locations within a gene, while maintaining a functional allele, is time consuming, expensive and technically challenging. We describe a system that combines gene trap and site-specific DNA inversion to generate mouse embryonic stem (ES) cell clones for the rapid production of conditional knockout mice, and the use of this system in an initial gene trap screen. Gene trapping should allow the selection of thousands of ES cell clones with defined insertions that can be used to generate conditional knockout mice, thereby providing extensive parallelism that eliminates the time-consuming steps of targeting vector construction and homologous recombination for each gene. PMID:15659575

  13. Application of System Operational Effectiveness Methodology to Space Launch Vehicle Development and Operations

    NASA Technical Reports Server (NTRS)

    Watson, Michael D.; Kelley, Gary W.

    2012-01-01

    The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.

  14. Assessing the impact of modeling limits on intelligent systems

    NASA Technical Reports Server (NTRS)

    Rouse, William B.; Hammer, John M.

    1990-01-01

    The knowledge bases underlying intelligent systems are validated. A general conceptual framework is provided for considering the roles in intelligent systems of models of physical, behavioral, and operational phenomena. A methodology is described for identifying limits in particular intelligent systems, and the use of the methodology is illustrated via an experimental evaluation of the pilot-vehicle interface within the Pilot's Associate. The requirements and functionality are outlined for a computer based knowledge engineering environment which would embody the approach advocated and illustrated in earlier discussions. Issues considered include the specific benefits of this functionality, the potential breadth of applicability, and technical feasibility.

  15. Technical evaluation of RETS-required reports for Browns Ferry Nuclear Power Station, Units 1, 2, and 3, for 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, T.E.; Magleby, E.H.

    1985-09-06

    A review was performed of reports required by federal regulations and the plant-specific radiological effluent technical specifications (RETS) for operations conducted at Tennessee Valley Authority's Browns Ferry Nuclear Station, Units 1, 2, and 3, during 1983. The two periodic reports reviewed were (a) the Effluents and Waste Disposal Semiannual Report, First Half 1983 and (b) the Effluents and Waste Disposal Semiannual Report, Second Half 1983. The principal review guidelines were the plant's specific RETs and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably completemore » and consistent with the review guidelines.« less

  16. 78 FR 33863 - Relationship Between General Design Criteria and Technical Specification Operability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0179] Relationship Between General Design Criteria and...) 2013-05, ``NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability.'' This RIS clarifies the NRC staff's position on the relationship between the general design...

  17. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  18. Detection of incipient defects in cables by partial discharge signal analysis

    NASA Astrophysics Data System (ADS)

    Martzloff, F. D.; Simmon, E.; Steiner, J. P.; Vanbrunt, R. J.

    1992-07-01

    As one of the objectives of a program aimed at assessing test methods for in-situ detection of incipient defects in cables due to aging, a laboratory test system was implemented to demonstrate that the partial discharge analysis method can be successfully applied to low-voltage cables. Previous investigations generally involved cables rated 5 kV or higher, while the objective of the program focused on the lower voltages associated with the safety systems of nuclear power plants. The defect detection system implemented for the project was based on commercially available signal analysis hardware and software packages, customized for the specific purposes of the project. The test specimens included several cables of the type found in nuclear power plants, including artificial defects introduced at various points of the cable. The results indicate that indeed, partial discharge analysis is capable of detecting incipient defects in low-voltage cables. There are, however, some limitations of technical and non-technical nature that need further exploration before this method can be accepted in the industry.

  19. Digital SPC switching technology: Foreign technology assessment

    NASA Astrophysics Data System (ADS)

    Fischman, Kurt; Jorstad, Norman D.

    1990-12-01

    This paper provides a foreign technology assessment of digital switching technology. Leading suppliers of digital switching technology are identified; although the United States holds a large part of the market, major companies in France, Sweden, Japan, the U.K., and Germany are also important. These countries, along with Belgium and Canada, are the most innovative and technically advanced. A listing is provided of transfers of digital switching technology to non-COCOM countries through licensing and joint ventures which reflects the widespread dissemination of this technology. Detailed technical specifications are provided for selected digital switching systems worldwide. The report concludes that considering the degree to which the technology is in place, that control of digital switching technology may not be feasible.

  20. Generation of Envelope-Modified Baculoviruses for Gene Delivery into Mammalian Cells.

    PubMed

    Hofmann, Christian

    2016-01-01

    Genetically modified baculoviruses can efficiently deliver and express genes in mammalian cells. The major prerequisite for the expression of a gene transferred by baculovirus is its control by a promoter that is active in mammalian cells. This chapter describes methods for producing second generation baculovirus vectors through modification of their envelope. Envelope modified baculoviruses offer additional new applications of the system, such as their use in in vivo gene delivery, targeting, and vaccination. Methods of generating a recombinant baculovirus vector with a modified envelope and its amplification and purification, including technical scale production, are discussed. A variety of notes give clues regarding specific technical procedures. Finally, methods to analyze the virus and transduction procedures are presented.

  1. The adjustable intelligent atrium sunshade

    NASA Astrophysics Data System (ADS)

    Ni, Xin; Sun, Jianhua; Wang, Bo

    2017-05-01

    This article is focused on the specific design techniques of the adjustable atrium sunshade, on the basis of the engineering analyses and practices, it is expected to alter the conventional atrium sunshade design concepts; with its uniqueness and technical excellence, this innovative atrium sunshade system exhibits rich emotions and artistry, creates an inspiring and romantic atmosphere at the atrium area of the building.

  2. Blueprint for a Needs Assessment: Contributing to a System of Care for Children with Special Needs & Their Families. A Technical Resource Brief.

    ERIC Educational Resources Information Center

    Ireys, Henry T.

    Designed to guide and structure the needs assessment of Pennsylvania children with special health care needs, this document describes six specific steps in planning and conducting a needs assessment. The steps include: (1) stating the goals of the needs assessment, including fulfilling legislative mandates, identifying geographical areas that have…

  3. Revision of ISO 15859 Aerospace Fluid Standards

    NASA Technical Reports Server (NTRS)

    Greene, Benjamin; McClure, Mark B.

    2012-01-01

    A detailed review of ISO 15859 "Space Systems - Fluid Characteristics, Sampling and Test Methods" was performed An approach to revising Parts 1-9 and 11-13 was developed and concurred by the NASA Technical Standards Program Office. The approach was to align them with the highest level source documents, and not to program-specific requirements. The updated documents were prepared and presented.

  4. SNAP (Space Nuclear Auxiliary Power) reactor overview. Final report, June 1982-December 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voss, S.S.

    1984-08-01

    The SNAP reactor programs are outlined in this report. A summary of the program is included along with a technical outline of the SER, S2DR, SNAP 10A/SNAPSHOT, S8ER, and S8DR reactor systems. Specifications of the designs, the design logic and a conclusion outlining some of the program weaknesses are given.

  5. Certificate Structure Study: Do Stackable Certificates Really "Add" up to a Degree? Research Report 17-2

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2017

    2017-01-01

    The purpose of this study is to answer key questions about the structure of certificates and their function in employability and degree attainment in the Washington State Community and Technical College (CTC) System. Specifically, this study addresses the following: (1) Do certificates play a role in helping students progress along career pathways…

  6. Observation and Coding Manual for the Longitudinal Study of Reading Comprehension and Science Concept Acquisition (Third Edition). Technical Report No. L-1.

    ERIC Educational Resources Information Center

    Meyer, Linda A.; And Others

    This manual describes the model--specifically the observation procedures and coding systems--used in a longitudinal study of how children learn to comprehend what they read, with particular emphasis on science texts. Included are procedures for the following: identifying students; observing--recording observations and diagraming the room; writing…

  7. Isolated step-down DC -DC converter for electric vehicles

    NASA Astrophysics Data System (ADS)

    Kukovinets, O. V.; Sidorov, K. M.; Yutt, V. E.

    2018-02-01

    Modern motor-vehicle industrial sector is moving rapidly now towards the electricity-driving cars production, improving their range and efficiency of components, and in particular the step-down DC/DC converter to supply the onboard circuit 12/24V of electric vehicle from the high-voltage battery. The purpose of this article - to identify the best circuitry topology to design an advanced step-down DC/DC converters with the smallest mass, volume, highest efficiency and power. And this will have a positive effect on driving distance of electric vehicle (EV). On the basis of computational research of existing and implemented circuit topologies of step-down DC/DC converters (serial resonant converter, full bridge with phase-shifting converter, LLC resonant converter) a comprehensive analysis was carried out on the following characteristics: specific volume, specific weight, power, efficiency. The data obtained was the basis for the best technical option - LLC resonant converter. The results can serve as a guide material in the process of components design of the traction equipment for electric vehicles, providing for the best technical solutions in the design and manufacturing of converting equipment, self-contained power supply systems and advanced driver assistance systems.

  8. A Management Model for International Participation in Space Exploration Missions

    NASA Technical Reports Server (NTRS)

    George, Patrick J.; Pease, Gary M.; Tyburski, Timothy E.

    2005-01-01

    This paper proposes an engineering management model for NASA's future space exploration missions based on past experiences working with the International Partners of the International Space Station. The authors have over 25 years of combined experience working with the European Space Agency, Japan Aerospace Exploration Agency, Canadian Space Agency, Italian Space Agency, Russian Space Agency, and their respective contractors in the design, manufacturing, verification, and integration of their elements electric power system into the United States on-orbit segment. The perspective presented is one from a specific sub-system integration role and is offered so that the lessons learned from solving issues of technical and cultural nature may be taken into account during the formulation of international partnerships. Descriptions of the types of unique problems encountered relative to interactions between international partnerships are reviewed. Solutions to the problems are offered, taking into consideration the technical implications. Through the process of investigating each solution, the important and significant issues associated with working with international engineers and managers are outlined. Potential solutions are then characterized by proposing a set of specific methodologies to jointly develop spacecraft configurations that benefits all international participants, maximizes mission success and vehicle interoperability while minimizing cost.

  9. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  10. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  11. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  12. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  13. Predicting Influential Factors of Secondary Career and Technical Education Teachers' Intent to Stay in the Profession

    ERIC Educational Resources Information Center

    Dainty, Julie D.

    2012-01-01

    Retaining highly qualified career and technical education teachers is important in maintaining and growing quality secondary career and technical education programs. Therefore, the purpose of this study was to identify factors contributing to teacher retention specifically in the area of career and technical education (CTE) and determine…

  14. Technical Communications in Aeronautics: Results of an Exploratory Study. NASA Technical Memorandum 101534, Parts 1 and 2.

    ERIC Educational Resources Information Center

    Pinelli, Thomas E.; And Others

    An exploratory study investigated technical communications in aeronautics by surveying aeronautical engineers and scientists. The study had five specific objectives: to solicit the opinions of aeronautical engineers and scientists regarding the importance of technical communications to their profession; to determine their use and production of…

  15. Production Functions for Water Delivery Systems: Analysis and Estimation Using Dual Cost Function and Implicit Price Specifications

    NASA Astrophysics Data System (ADS)

    Teeples, Ronald; Glyer, David

    1987-05-01

    Both policy and technical analysis of water delivery systems have been based on cost functions that are inconsistent with or are incomplete representations of the neoclassical production functions of economics. We present a full-featured production function model of water delivery which can be estimated from a multiproduct, dual cost function. The model features implicit prices for own-water inputs and is implemented as a jointly estimated system of input share equations and a translog cost function. Likelihood ratio tests are performed showing that a minimally constrained, full-featured production function is a necessary specification of the water delivery operations in our sample. This, plus the model's highly efficient and economically correct parameter estimates, confirms the usefulness of a production function approach to modeling the economic activities of water delivery systems.

  16. Non-technical skills and health care provision in low- and middle-income countries: a systematic review.

    PubMed

    Scott, John; Revera Morales, Dianali; McRitchie, Andrew; Riviello, Robert; Smink, Douglas; Yule, Steven

    2016-04-01

    Health care workers must possess high levels of medical knowledge, technical skills and also non-technical skills (NTS) in order to provide safe, effective and patient-centred care. Although there has been a recent proliferation of NTS assessment and training tools developed in high-income countries, little is known about NTS in low- and middle-income countries (LMICs), which face a variety of provider-level and system-level challenges. The aim of this study was to identify the NTS used by providers in LMICs that have been studied, describe how they are assessed and taught, and explain the contextual factors in LMICs that affect their use. We conducted a systematic literature review in accordance with preferred reporting items for systematic reviews and meta-analyses guidelines for primary research publications from January 1994 to December 2013 on evaluation or teaching of NTS used by health care workers in LMICs using MEDLINE, Embase, CIHHAL and Web of Science. Bibliographies of relevant manuscripts were also hand-searched to identify all potentially eligible manuscripts. We identified 21 manuscripts from 17 LMICs involving eight types of health care providers and trainees. These studies covered five NTS categories: decision making, communication, teamwork, leadership and stress management. The most commonly used methods were questionnaires, interviews and observations, and 43% (n = 9) scored > 10 points using the Medical Education Research Study Quality Instrument. Although many studies highlighted the ways in which overburdened health care systems, lack of provider empowerment and deficiencies in provider training had an impact on providers' use of these NTS, no context-specific assessment or educational tools were identified. There is growing worldwide interest in understanding and teaching critical non-technical skills to health care providers. This review highlights several studies describing a variety of important non-technical skills. However, these skills must be further characterised in order to develop context-specific tools for assessing and teaching NTS that are sensitive to the local challenges that are common across a variety of LMIC contexts. © 2016 John Wiley & Sons Ltd.

  17. International Low Impact Docking System (iLIDS) Project Technical Requirements Specification, Revision F

    NASA Technical Reports Server (NTRS)

    Lewis, James L.

    2011-01-01

    The NASA Docking System (NDS) is NASA's implementation for the emerging International Docking System Standard (IDSS) using low impact docking technology. The NASA Docking System Project (NDSP) is the International Space Station (ISS) Program's project to produce the NDS, Common Docking Adapter (CDA) and Docking Hub. The NDS design evolved from the Low Impact Docking System (LIDS). The acronym international Low Impact Docking System (iLIDS) is also used to describe this system as well as the Government Furnished Equipment (GFE) project designing the NDS for the NDSP. NDS and iLIDS may be used interchangeability. This document will use the acronym iLIDS. Some of the heritage documentation and implementations (e.g., software command names, requirement identification (ID), figures, etc.) used on NDS will continue to use the LIDS acronym. This specification defines the technical requirements for the iLIDS GFE delivered to the NDSP by the iLIDS project. This document contains requirements for two iLIDS configurations, SEZ29101800-301 and SEZ29101800-302. Requirements with the statement, iLIDS shall, are for all configurations. Examples of requirements that are unique to a single configuration may be identified as iLIDS (-301) shall or iLIDS (-302) shall. Furthermore, to allow a requirement to encompass all configurations with an exception, the requirement may be designated as iLIDS (excluding -302) shall. Verification requirements for the iLIDS project are identified in the Verification Matrix (VM) provided in the iLIDS Verification and Validation Document, JSC-63966. The following definitions differentiate between requirements and other statements: Shall: This is the only verb used for the binding requirements. Should/May: These verbs are used for stating non-mandatory goals. Will: This verb is used for stating facts or declaration of purpose. A Definition of Terms table is provided in Appendix B to define those terms with specific tailored uses in this document.

  18. A Product Development Decision Model for Cockpit Weather Information System

    NASA Technical Reports Server (NTRS)

    Sireli, Yesim; Kauffmann, Paul; Gupta, Surabhi; Kachroo, Pushkin; Johnson, Edward J., Jr. (Technical Monitor)

    2003-01-01

    There is a significant market demand for advanced cockpit weather information products. However, it is unclear how to identify the most promising technological options that provide the desired mix of consumer requirements by employing feasible technical systems at a price that achieves market success. This study develops a unique product development decision model that employs Quality Function Deployment (QFD) and Kano's model of consumer choice. This model is specifically designed for exploration and resolution of this and similar information technology related product development problems.

  19. On operator strategic behavior

    NASA Technical Reports Server (NTRS)

    Hancock, P. A.

    1991-01-01

    Deeper and more detailed knowledge as to how human operators such as pilots respond, singly and in groups, to demands on their performance which arise from technical systems will support the manipulation of such systems' design in order to accommodate the foibles of human behavior. Efforts to understand how self-autonomy impacts strategic behavior and such related issues as error generation/recognition/correction are still in their infancy. The present treatment offers both general and aviation-specific definitions of strategic behavior as precursors of prospective investigations.

  20. A Product Development Decision Model for Cockpit Weather Information Systems

    NASA Technical Reports Server (NTRS)

    Sireli, Yesim; Kauffmann, Paul; Gupta, Surabhi; Kachroo, Pushkin

    2003-01-01

    There is a significant market demand for advanced cockpit weather information products. However, it is unclear how to identify the most promising technological options that provide the desired mix of consumer requirements by employing feasible technical systems at a price that achieves market success. This study develops a unique product development decision model that employs Quality Function Deployment (QFD) and Kano's model of consumer choice. This model is specifically designed for exploration and resolution of this and similar information technology related product development problems.

Top