Sample records for system twrs technical

  1. TWRS technical baseline database manager definition document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acree, C.D.

    1997-08-13

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.

  2. Tank waste remediation system functions and requirements document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, K.E

    1996-10-03

    This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technicalmore » Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.« less

  3. TWRS Configuration management program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  4. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  5. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  6. Technology development in support of the TWRS process flowsheet. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, D.J.

    1995-10-11

    The Tank Waste Remediation System is to treat and dispose of Hanford`s Single-Shell and Double-Shell Tank Waste. The TWRS Process Flowsheet, (WHC-SD-WM-TI-613 Rev. 1) described a flowsheet based on a large number of assumptions and engineering judgements that require verification or further definition through process and technology development activities. This document takes off from the TWRS Process Flowsheet to identify and prioritize tasks that should be completed to strengthen the technical foundation for the flowsheet.

  7. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  8. K Basins sludge removal temporary sludge storage tank system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mclean, M.A.

    1997-06-12

    Shipment of sludge from the K Basins to a disposal site is now targeted for August 2000. The current path forward for sludge disposal is shipment to Tank AW-105 in the Tank Waste Remediation System (TWRS). Significant issues of the feasibility of this path exist primarily due to criticality concerns and the presence of polychlorinated biphenyls (PCBS) in the sludge at levels that trigger regulation under the Toxic Substance Control Act. Introduction of PCBs into the TWRS processes could potentially involve significant design and operational impacts to both the Spent Nuclear Fuel and TWRS projects if technical and regulatory issuesmore » related to PCB treatment cannot be satisfactorily resolved. Concerns of meeting the TWRS acceptance criteria have evolved such that new storage tanks for the K Basins sludge may be the best option for storage prior to vitrification of the sludge. A reconunendation for the final disposition of the sludge is scheduled for June 30, 1997. To support this decision process, this project was developed. This project provides a preconceptual design package including preconceptual designs and cost estimates for the temporary sludge storage tanks. Development of cost estimates for the design and construction of sludge storage systems is required to help evaluate a recommendation for the final disposition of the K Basin sludge.« less

  9. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  10. Functions and requirements document for interim store solidified high-level and transuranic waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less

  11. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  12. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  13. Authorization basis requirements comparison report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brantley, W.M.

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documentsmore » that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.« less

  14. TWRS authorization basis configuration control summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mendoza, D.P.

    This document was developed to define the Authorization Basis management functional requirements for configuration control, to evaluate the management control systems currently in place, and identify any additional controls that may be required until the TWRS [Tank Waste Remediation System] Configuration Management system is fully in place.

  15. TWRS configuration management requirement source document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management (CM) Requirement Source document prescribes CM as a basic product life-cycle function by which work and activities are conducted or accomplished. This document serves as the requirements basis for the TWRS CM program. The objective of the TWRS CM program is to establish consistency among requirements, physical/functional configuration, information, and documentation for TWRS and TWRS products, and to maintain this consistency throughout the life-cycle of TWRS and the product, particularly as changes are being made.

  16. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hendrickson, D.W.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  17. Tank waste remediation system tank waste retrieval risk management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  18. Tank waste remediation system nuclear criticality safety program management review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  19. Mission analysis for cross-site transfer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riesenweber, S.D.; Fritz, R.L.; Shipley, L.E.

    1995-11-01

    The Mission Analysis Report describes the requirements and constraints associated with the Transfer Waste Function as necessary to support the Manage Tank Waste, Retrieve Waste, and Process Tank Waste Functions described in WHC-SD-WM-FRD-020, Tank Waste Remediation System (TWRS) Functions and Requirements Document and DOE/RL-92-60, Revision 1, TWRS Functions and Requirements Document, March 1994. It further assesses the ability of the ``initial state`` (or current cross-site transfer system) to meet the requirements and constraints.

  20. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of themore » Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.« less

  1. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  2. TWRS vadose zone contamination issue expert panel report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, D.S.

    1997-05-01

    When members were first canvassed for participation in the Vadose Zone Expert Panel the stated purpose for convening the Panel was to review a controversial draft report, the SX Tank Farm Report. This report was produced by a DOE Grand Junction Project Office (GJPO) contractor, RUST Geotech, now MACTEC-ERS, for the DOE Richland Office (DOERL). Three meetings were planned for June, July and August, 1995 to review the draft report and to complete a Panel report by mid-September. The Expert Panel has found its efforts confounded by various non-technical issues. The Expert Panel has chosen to address some of themore » non-technical issues in this Preface rather than to dilute the technical discussion that follows in the body of this independent expert panel status report (Panel Report). Rather than performing a straightforward manuscript review, the Panel was asked to resolve conflicting interpretations of gamma-ray logging measurements performed in vadose zone boreholes (drywells) surrounding the high-level radioactive wastes of the SX tank farm. There are numerous and complex technical issues that must be evaluated before the vertical and radial extent of contaminant migration at the SX tank farm can be accurately assessed. When the Panel first met in early June, 1996, it quickly became apparent that the scientific and technical issues were obscured by policy and institutional affairs which have polarized discussion among various segments of the Hanford organization. This situation reflects the kinds of institutional problems described separately in reports by the National Research Council of the National Academy of Sciences (NAS/NRC), The Hanford Tanks Environmental Impacts and Policy Choices and BmTiers to Science: Technical Management of the Department of Energy Environmental Remediation Program. The Vadose Zone Characterization Program, appears to be caught between conflicting pressures and organizational mandates, some imposed from outside DOE-RL and some self-imposed. The institutional problems they encountered include having both Tank Waste Remediation System (TWRS), the parent organization of the Vadose Zone Characterization Program and Environmental Restoration (ER), each under different regulatory controls and different organizational units, seeking to defend the status quo and discount many of the Panel`s conclusions and recommendations. The results presented in the SX Tank Farm Report, especially the visualizations, have created concern in the public sector, both on a local, personal level and on a national political level.« less

  3. Tank waste remediation system systems engineering management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickney, R.G.

    This report presents the results of a systematic evaluation conducted to identify miscellaneous TWRS facilities, tanks and components with potential needed authorization basis upgrades. It provides the Authorization Basis upgrade plan for those miscellaneous TWRS facilities, tanks and components identified.

  5. Tank characterization report for single-shell tank 241-C-109

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpson, B.C.

    1997-05-23

    One of the major functions of the Tank Waste Remediation System (TWRS) is to characterize wastes in support of waste management and disposal activities at the Hanford Site. Analytical data from sampling and analysis, along with other available information about a tank, are compiled and maintained in a tank characterization report (TCR). This report and its appendices serve as the TCR for single-shell tank 241-C-109. The objectives of this report are: (1) to use characterization data in response to technical issues associated with tank 241 C-109 waste; and (2) to provide a standard characterization of this waste in terms ofmore » a best-basis inventory estimate. The response to technical issues is summarized in Section 2.0, and the best-basis inventory estimate is presented in Section 3.0. Recommendations regarding safety status and additional sampling needs are provided in Section 4.0. Supporting data and information are contained in the appendices.« less

  6. Tank characterization report for single-shell tank 241-S-111

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conner, J.M.

    1997-04-28

    One of the major functions of the Tank Waste Remediation System (TWRS) is to characterize wastes in support of waste management and disposal activities at the Hanford Site. Analytical data from sampling and analysis, along with other available information about a tank, are compiled and maintained in a tank characterization report (TCR). This report and its appendices serve as the TCR for single-shell tank 241-S-111. The objectives of this report are: (1) to use characterization data to address technical issues associated with tank 241-S-111 waste; and (2) to provide a standard characterization of this waste in terms of a best-basismore » inventory estimate. The response to technical issues is summarized in Section 2.0, and the best-basis inventory estimate is presented in Section 3.0. Recommendations regarding safety status and additional sampling needs are provided in Section 4.0. Supporting data and information are contained in the appendices. This report also supports the requirements of Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1996) milestone M-44-10.« less

  7. Progress and future direction for the interim safe storage and disposal of Hanford high-level waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less

  8. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for low-activity waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assme appropriate data will be collected to support the activity, ''Confirm Tank Plans and Requirements.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less

  9. Temporal and Spatial Variations in the Twinning Rate in Norway.

    PubMed

    Fellman, Johan

    2016-08-01

    Strong geographical variations have been noted in the twinning rate (TWR). In general, the rate is high among people of African origin, intermediate among Europeans, and low among most Asiatic populations. In Europe, there tends to be a south-north cline, with a progressive increase in the TWR from south to north and a minimum around the Basque provinces. The highest TWRs in Europe have been found among the Nordic populations. Furthermore, within larger populations, small isolated subpopulations have been identified to have extreme, mainly high, TWRs. In the study of the temporal variation of the TWR in Norway, we consider the period from 1900 to 2014. The regional variation of the TWR in Norway is analyzed for the different counties for two periods, 1916-1926 and 1960-1988. Heterogeneity between the regional TWRs in Norway during 1916-1926 was found, but the goodness of fit for the alternative spatial models was only slight. The optimal regression model for the TWR in Norway has the longitude and its square as regressors. According to this model, the spatial variation is distributed in a west-east direction. For 1960-1988, no significant regional variation was observed. One may expect that the environmental and genetic differences between the counties in Norway have disappeared and that the regional TWRs have converged towards a common low level.

  10. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for high-level waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The U.S. Department of Energy-Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of high-level waste (HLW) that is currently managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver HLW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD) for HLW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed (RTP) deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of HLW feed to the Privatization Contractor. The scenario specifies tanks from which HLW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Tank TI is Acceptable for Feed,'' was identified to verify the basis used to develop the scenario Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assure appropriate data will be collected to support the activity, ''Confirm Tank T is Acceptable for HLW Feed.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less

  11. Implementation plan for HANDI 2000 TWRS master equipment list

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  12. Significant volume reduction of tank waste by selective crystallization: 1994 Annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herting, D.L.; Lunsford, T.R.

    1994-09-27

    The objective of this technology task plan is to develop and demonstrate a scaleable process of reclaim sodium nitrate (NaNO{sub 3}) from Hanford waste tanks as a clean nonradioactive salt. The purpose of the so-called Clean Salt Process is to reduce the volume of low level waste glass by as much as 70%. During the reporting period of October 1, 1993, through May 31, 1994, progress was made on four fronts -- laboratory studies, surrogate waste compositions, contracting for university research, and flowsheet development and modeling. In the laboratory, experiments with simulated waste were done to explore the effects ofmore » crystallization parameters on the size and crystal habit of product NaNO{sub 3} crystals. Data were obtained to allows prediction of decontamination factor as a function of solid/liquid separation parameters. Experiments with actual waste from tank 101-SY were done to determine the extent of contaminant occlusions in NaNO{sub 3} crystals. In preparation for defining surrogate waste compositions, single shell tanks were categorized according to the weight percent NaNO{sub 3} in each tank. A detailed process flowsheet and computer model were created using the ASPENPlus steady state process simulator. This is the same program being used by the Tank Waste Remediation System (TWRS) program for their waste pretreatment and disposal projections. Therefore, evaluations can be made of the effect of the Clean Salt Process on the low level waste volume and composition resulting from the TWRS baseline flowsheet. Calculations, using the same assumptions as used for the TWRS baseline where applicable indicate that the number of low level glass vaults would be reduced from 44 to 16 if the Clean Salt Process were incorporated into the baseline flowsheet.« less

  13. Portable exhausters POR-004 SKID B, POR-005 SKID C, POR-006 SKID D storage plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, O.D.

    1997-09-04

    This document provides a storage plan for portable exhausters POR-004 SKID B, POR-005 SKID C, AND POR-006 SKID D. The exhausters will be stored until they are needed by the TWRS (Tank Waste Remediation Systems) Saltwell Pumping Program. The storage plan provides criteria for portable exhauster storage, periodic inspections during storage, and retrieval from storage.

  14. Feasibility study of tank leakage mitigation using subsurface barriers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Treat, R.L.; Peters, B.B.; Cameron, R.J.

    1994-09-21

    The US Department of Energy (DOE) has established the Tank Waste Remediation System (TWRS) to satisfy manage and dispose of the waste currently stored in the underground storage tanks. The retrieval element of TWRS includes a work scope to develop subsurface impermeable barriers beneath SSTs. The barriers could serve as a means to contain leakage that may result from waste retrieval operations and could also support site closure activities by facilitating cleanup. Three types of subsurface barrier systems have emerged for further consideration: (1) chemical grout, (2) freeze walls, and (3) desiccant, represented in this feasibility study as a circulatingmore » air barrier. This report contains analyses of the costs and relative risks associated with combinations retrieval technologies and barrier technologies that from 14 alternatives. Eight of the alternatives include the use of subsurface barriers; the remaining six nonbarrier alternative are included in order to compare the costs, relative risks and other values of retrieval with subsurface barriers. Each alternative includes various combinations of technologies that can impact the risks associated with future contamination of the groundwater beneath the Hanford Site to varying degrees. Other potential risks associated with these alternatives, such as those related to accidents and airborne contamination resulting from retrieval and barrier emplacement operations, are not quantitatively evaluated in this report.« less

  15. Safety equipment list for the 241-SY-101 RAPID mitigation project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MORRIS, K.L.

    1999-06-29

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein.

  16. Design review report for the SY-101 RAPID mitigation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHLOSSER, R.L.

    1999-05-24

    This report documents design reviews conducted of the SY-101 Respond And Pump In Days (RAPID) Mitigation System. As part of the SY-101 Surface-Level-Rise Remediation Project, the SY-101 WID Mitigation System will reduce the potential unacceptable consequences of crust growth in Tank 241-SY-101 (SY-101). Projections of the crust growth rate indicate that the waste level in the tank may reach the juncture of the primary and secondary confinement structures of the tank late in 1999. Because of this time constraint, many design activities are being conducted in parallel and design reviews were conducted for system adequacy as well as design implementationmore » throughout the process. Design implementation, as used in this design review report, is the final component selection (e.g., which circuit breaker, valve, or thermocouple) that meets the approved design requirements, system design, and design and procurement specifications. Design implementation includes the necessary analysis, testing, verification, and qualification to demonstrate compliance with the system design and design requirements. Design implementation is outside the scope of this design review. The design activities performed prior to detailed design implementation (i.e., system mission requirements, functional design requirements, technical criteria, system conceptual design, and where design and build contracts were placed, the procurement specification) have been reviewed and are within the scope of this design review report. Detailed design implementation will be controlled, reviewed, and where appropriate, approved in accordance with Tank Waste Remediation System (TWRS) engineering procedures. Review of detailed design implementation will continue until all components necessary to perform the transfer function are installed and tested.« less

  17. Office of River Protection Integrated Safety Management System Description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CLARK, D.L.

    Revision O was never issued. Finding safe and environmentally sound methods of storage and disposal of 54 million gallons of highly radioactive waste contained in 177 underground tanks is the largest challenge of Hanford cleanup. TWRS was established in 1991 and continues to integrate all aspects of the treatment and management of the high-level radioactive waste tanks. In fiscal Year 1997, program objectives were advanced in a number of areas. RL TWRS refocused the program toward retrieving, treating, and immobilizing the tank wastes, while maintaining safety as first priority. Moving from a mode of storing the wastes to getting themore » waste out of the tanks will provide the greatest cleanup return on the investment and eliminate costly mortgage continuance. There were a number of safety-related achievements in FY1997. The first high priority safety issue was resolved with the removal of 16 tanks from the ''Wyden Watch List''. The list, brought forward by Senator Ron Wyden of Oregon, identified various Hanford safety issues needing attention. One of these issues was ferrocyanide, a chemical present in 24 tanks. Although ferrocyanide can ignite at high temperature, analysis found that the chemical has decomposed into harmless compounds and is no longer a concern.« less

  18. TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BURBANK, D.A.

    This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less

  19. Chemical composition of Hanford Tank SY-102

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birnbaum, E.; Agnew, S.; Jarvinen, G.

    1993-12-01

    The US Department of Energy established the Tank Waste Remediation System (TWRS) to safely manage and dispose of the radioactive waste, both current and future, stored in double-shell and single-shell tanks at the Hanford sites. One major program element in TWRS is pretreatment which was established to process the waste prior to disposal using the Hanford Waste Vitrification Plant. In support of this program, Los Alamos National Laboratory has developed a conceptual process flow sheet which will remediate the entire contents of a selected double-shelled underground waste tank, including supernatant and sludge, into forms that allow storage and final disposalmore » in a safe, cost-effective and environmentally sound manner. The specific tank selected for remediation is 241-SY-102 located in the 200 West Area. As part of the flow sheet development effort, the composition of the tank was defined and documented. This database was built by examining the history of liquid waste transfers to the tank and by performing careful analysis of all of the analytical data that have been gathered during the tank`s lifetime. In order to more completely understand the variances in analytical results, material and charge balances were done to help define the chemistry of the various components in the tank. This methodology of defining the tank composition and the final results are documented in this report.« less

  20. Clean option: An alternative strategy for Hanford Tank Waste Remediation. Volume 2, Detailed description of first example flowsheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swanson, J.L.

    1993-09-01

    Disposal of high-level tank wastes at the Hanford Site is currently envisioned to divide the waste between two principal waste forms: glass for the high-level waste (HLW) and grout for the low-level waste (LLW). The draft flow diagram shown in Figure 1.1 was developed as part of the current planning process for the Tank Waste Remediation System (TWRS), which is evaluating options for tank cleanup. The TWRS has been established by the US Department of Energy (DOE) to safely manage the Hanford tank wastes. It includes tank safety and waste disposal issues, as well as the waste pretreatment and wastemore » minimization issues that are involved in the ``clean option`` discussed in this report. This report describes the results of a study led by Pacific Northwest Laboratory to determine if a more aggressive separations scheme could be devised which could mitigate concerns over the quantity of the HLW and the toxicity of the LLW produced by the reference system. This aggressive scheme, which would meet NRC Class A restrictions (10 CFR 61), would fit within the overall concept depicted in Figure 1.1; it would perform additional and/or modified operations in the areas identified as interim storage, pretreatment, and LLW concentration. Additional benefits of this scheme might result from using HLW and LLW disposal forms other than glass and grout, but such departures from the reference case are not included at this time. The evaluation of this aggressive separations scheme addressed institutional issues such as: radioactivity remaining in the Hanford Site LLW grout, volume of HLW glass that must be shipped offsite, and disposition of appropriate waste constituents to nonwaste forms.« less

  1. Integration and baseline management training and transition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jech, J.B.

    The purpose of the Integration and Baseline Management Training and Transition Plan is to provide a training outline for the Integration and Baseline Management (I and BM) organization and a transition strategy for the Master Equipment List (MEL) Phase 1 application. The training outline includes the following courses: MEL Phase 1 Application Course 1 Master Equipment List General Overview. Course 2 Master Equipment List Editing. Tank Waste Remediation System (TWRS) Labeling Related Course 3 TWRS Equipment Labeling Program (Course Number 350545). As part of courses 1, 2, and 3, it is recommended that a lesson plan be developed and integratedmore » into each of the three courses on the subject of Configuration Management (CM) to include: CM concepts, terminology, definitions, fundamentals and its application with respect to the course. The strategy for the MEL Phase 1 application is to train internal organizations (I and BM) on the MEL-General Overview for read only users and train MEL-Editing for edit users (only on an as needed basis). For external organizations, the strategy is to train selected personnel on the MEL-General Overview and transition them from read only privileges to editing privileges when the appropriate administrative procedures that outline the external organization`s responsibilities (to support MEL) are established. The purpose of this training is to ensure support of the I and BM organization objectives within the TV,IRS Division. These training courses will be added to the existing required training for I and BM personnel only. Other organizations implementing the training will be directed by their management on which training is required.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guo Baonian; Gossmann, Hans-Joachim; Toh, Terry

    Angle control has been widely accepted as the key requirement for ion implantation in semiconductor device processing. From an ion implanter point of view, the incident ion direction should be measured and corrected by suitable techniques, such as XP-VPS for the VIISta implanter platform, to ensure precision ion placement in device structures. So called V-curves have been adopted to generate the wafer-based calibration using channeling effects as the Si lattice steer ions into a channeling direction. Thermal Wave (TW) or sheet resistance (Rs) can be used to determine the minimum of the angle response curve. Normally it is expected thatmore » the TW and Rs have their respective minima at identical angles. However, the TW and Rs response to the angle variations does depend on factors such as implant species, dose, and wafer temperature. Implant damage accumulation effects have to be considered for data interpretation especially for some 'abnormal' V-curve data. In this paper we will discuss some observed 'abnormal' angle responses, such as a) TW/Rs reverse trend for Arsenic beam, 2) 'W' shape of Rs Boron, and 3) apparent TW/Rs minimum difference for high tilt characterization, along with experimental data and TCAD simulations.« less

  3. Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RASMUSSEN, J.H.

    1999-08-02

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102 required to satisfy the Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank TIS An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase 1: Confirm Tank TIS An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste andmore » High Level Waste Feed Data Quality Objectives (L&H DQO) (Patello et al. 1999) and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues, except the Equipment DQO apply to tank 241-AZ-102 for this sampling event. The Equipment DQO is applied for shear strength measurements of the solids segments only. Poppiti (1999) requires additional americium-241 analyses of the sludge segments. Brown et al. (1998) also identify safety screening, regulatory issues and provision of samples to the Privatization Contractor(s) as applicable issues for this tank. However, these issues will not be addressed via this sampling event. Reynolds et al. (1999) concluded that information from previous sampling events was sufficient to satisfy the safety screening requirements for tank 241 -AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses, and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AZ-102 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plan.« less

  4. Hanford analytical sample projections FY 1998--FY 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joyce, S.M.

    1998-02-12

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management,more » and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.« less

  5. Preliminary survey of separations technology applicable to the pretreatment of Hanford tank waste (1992--1993)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, W.E.; Kurath, D.E.

    1994-04-01

    The US Department of Energy has established the Tank Waste Remediation System (TWRS) to manage and dispose of radioactive wastes stored at the Hanford Site. Within this program are evaluations of pretreatment system alternatives through literature reviews. The information in this report was collected as part of this project at Pacific Northwest Laboratory. A preliminary survey of literature on separations recently entered into the Hanford electronic databases (1992--1993) that have the potential for pretreatment of Hanford tank waste was conducted. Separation processes that can assist in the removal of actinides (uranium, plutonium, americium), lanthanides, barium, {sup 137}Cs, {sup 90}Sr,{sup 129more » }I, {sup 63}Ni, and {sup 99}Tc were evaluated. Separation processes of interest were identified through literature searches, journal reviews, and participation in separation technology conferences. This report contains brief descriptions of the potential separation processes, the extent and/or selectivity of the separation, the experimental conditions, and observations. Information was collected on both national and international separation studies to provide a global perspective on recent research efforts.« less

  6. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacobsen, P.H.

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  7. K basins sludge removal sludge pretreatment system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, H.L.

    1997-06-12

    The Spent Nuclear Fuels Program is in the process of planning activities to remove spent nuclear fuel and other materials from the 100-K Basins as a remediation effort for clean closure. The 105 K- East and K-West Basins store spent fuel, sludge, and debris. Sludge has accumulated in the 1 00 K Basins as a result of fuel oxidation and a slight amount of general debris being deposited, by settling, in the basin water. The ultimate intent in removing the sludge and fuel is to eliminate the environmental risk posed by storing fuel at the K Basins. The task formore » this project is to disposition specific constituents of sludge (metallic fuel) to produce a product stream through a pretreatment process that will meet the requirements, including a final particle size acceptable to the Tank Waste Remediation System (TWRS). The purpose of this task is to develop a preconceptual design package for the K Basin sludge pretreatment system. The process equipment/system is at a preconceptual stage, as shown in sketch ES-SNF-01 , while a more refined process system and material/energy balances are ongoing (all sketches are shown in Appendix C). Thus, the overall process and 0535 associated equipment have been conservatively selected and sized, respectively, to establish the cost basis and equipment layout as shown in sketches ES- SNF-02 through 08.« less

  8. Tank characterization report for double-shell tank 241-AW-105

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sasaki, L.M.

    1997-06-05

    One of the major functions of the Tank Waste Remediation System (TWRS) is to characterize wastes in support of waste management and disposal activities at the Hanford Site. Analytical data from sampling and analysis, along with other available information about a tank, are compiled and maintained in a tank characterization report (TCR). This report and its appendices serve as the TCR for double-shell tank 241-AW-105. The objectives of this report are to use characterization data in response to technical issues associated with tank 241-AW-105 waste; and to provide a standard characterization of this waste in terms of a best-basis inventorymore » estimate. The response to technical issues is summarized in Section 2.0, and the best-basis inventory estimate is presented in Section 3.0. Recommendations regarding safety status and additional sampling needs are provided in Section 4.0. Supporting data and information are contained in the appendices. This report supports the requirements of the Hanford Federal Facility Agreement and Consent Order milestone Characterization. information presented in this report originated from sample analyses and known historical sources. While only the results of a recent sampling event will be used to fulfill the requirements of the data quality objectives (DQOs), other information can be used to support or question conclusions derived from these results. Historical information for tank 241-AW-105 is provided in Appendix A, including surveillance information, records pertaining to waste transfers and tank operations, and expected tank contents derived from a process knowledge model. The recent sampling event listed, as well as pertinent sample data obtained before 1996, are summarized in Appendix B along with the sampling results. The results of the 1996 grab sampling event satisfied the data requirements specified in the sampling and analysis plan (SAP) for this tank. In addition, the tank headspace flammability was measured, which addresses one of the requirements specified in the safety screening DQO. The statistical analysis and numerical manipulation of data used in issue resolution are reported in Appendix C. Appendix D contains the evaluation to establish the best basis for the inventory estimate and the statistical analysis performed for this evaluation. A bibliography that resulted from an in-depth literature search of all known information sources applicable to tank 241-AW-105 and its respective waste types is contained in Appendix E. A majority of the documents listed in Appendix E may be found in the Tank Characterization and Safety Resource Center.« less

  9. Description of waste pretreatment and interfacing systems dynamic simulation model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garbrick, D.J.; Zimmerman, B.D.

    1995-05-01

    The Waste Pretreatment and Interfacing Systems Dynamic Simulation Model was created to investigate the required pretreatment facility processing rates for both high level and low level waste so that the vitrification of tank waste can be completed according to the milestones defined in the Tri-Party Agreement (TPA). In order to achieve this objective, the processes upstream and downstream of the pretreatment facilities must also be included. The simulation model starts with retrieval of tank waste and ends with vitrification for both low level and high level wastes. This report describes the results of three simulation cases: one based on suggestedmore » average facility processing rates, one with facility rates determined so that approximately 6 new DSTs are required, and one with facility rates determined so that approximately no new DSTs are required. It appears, based on the simulation results, that reasonable facility processing rates can be selected so that no new DSTs are required by the TWRS program. However, this conclusion must be viewed with respect to the modeling assumptions, described in detail in the report. Also included in the report, in an appendix, are results of two sensitivity cases: one with glass plant water recycle steams recycled versus not recycled, and one employing the TPA SST retrieval schedule versus a more uniform SST retrieval schedule. Both recycling and retrieval schedule appear to have a significant impact on overall tank usage.« less

  10. Load drop evaluation for TWRS FSAR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Julyk, L.J.; Ralston, G.L.

    1996-09-30

    Operational or remediation activities associated with existing underground high-level waste storage tank structures at the Hanford Site often require the installation/removal of various equipment items. To gain tank access for installation or removal of this equipment, large concrete cover blocks must be removed and reinstalled in existing concrete pits above the tanks. An accidental drop of the equipment or cover blocks while being moved over the tanks that results in the release of contaminants to the air poses a potential risk to onsite workers or to the offsite public. To minimize this potential risk, the use of critical lift hoistingmore » and rigging procedures and restrictions on lift height are being considered during development of the new tank farm Basis for Interim Operation and Final Safety Analysis Report. The analysis contained herein provides information for selecting the appropriate lift height restrictions for these activities.« less

  11. Type C investigation of electrical fabrication projects in ICF Kaiser shops

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huckfeldt, R.A.

    1995-06-01

    A Type C Investigation Board was convened to investigate an electrical miswiring problem found during the operation of the electrical distribution trailer for the TWRS Rotary Mode Core Sampling Truck {number_sign}2. The trailer was designed by WHC and fabricated ICF KH on site for use in the Characterization Program. This problem resulted in a serious safety hazard since the support truck frame/chassis became electrically energized. This final report provides results of the ``Type C Investigation, Electrical Fabrication Projects in ICF KH Shops, June, 1995.`` It contains the investigation scope, executive summary, relevant facts, analysis, conclusions and corrective actions. DOE Ordermore » 5484.1, ``Environmental Protection, Safety and Health Protection Information Reporting Requirements,`` was followed in preparation of this report. Because the incident was electrical in nature and involved both Westinghouse Hanford Company and ICF Kaiser Hanford organizations, the board included members from both contractors and members with considerable electrical expertise.« less

  12. Compatibility Grab Sampling and Analysis Plan for FY 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SASAKI, L.M.

    1999-12-29

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. It is written in accordance with requirements identified in Data Quality Objectives for Tank Farms Waste Compatibility Program (Mulkey et al. 1999) and Tank Farm Waste Transfer Compatibility Program (Fowler 1999). In addition to analyses to support Compatibility, the Waste Feed Delivery program has requested that tank samples obtained for Compatibility also be analyzed to confirm the high-level waste and/or low-activity waste envelope(s) for the tank waste (Baldwin 1999). The analytical requirements tomore » confirm waste envelopes are identified in Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Nguyen 1999a) and Data Quality Objectives for RPP Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for High-Level Waste Feed Batch X (Nguyen 1999b).« less

  13. 75 FR 20817 - Information Systems Technical Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC... Administration on technical questions that affect the level of export controls applicable to information systems...

  14. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  15. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  16. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  17. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  18. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  19. NREL Partners with Technical University of Denmark on Renewable Energy

    Science.gov Websites

    System | Energy Systems Integration Facility | NREL Technical University of Denmark NREL Partners with Technical University of Denmark on Renewable Energy System NREL is working in partnership with the Technical University of Denmark for the Centre for IT-Intelligent Energy Systems in Cities

  20. Engineering study of 50 miscellaneous inactive underground radioactive waste tanks located at the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman-Pollard, J.R.

    1994-03-02

    This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less

  1. Composite Socio-Technical Systems: A Method for Social Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Yingchen; He, Fulin; Hao, Jun

    In order to model and study the interactions between social on technical systems, a systemic method, namely the composite socio-technical systems (CSTS), is proposed to incorporate social systems, technical systems and the interaction mechanism between them. A case study on University of Denver (DU) campus grid is presented in paper to demonstrate the application of the proposed method. In the case study, the social system, technical system, and the interaction mechanism are defined and modelled within the framework of CSTS. Distributed and centralized control and management schemes are investigated, respectively, and numerical results verifies the feasibility and performance of themore » proposed composite system method.« less

  2. Technical Concept Document. Central Archive for Reusable Defense Software (CARDS)

    DTIC Science & Technology

    1994-02-28

    FeNbry 1994 INFORMAL TECHNICAL REPORT For The SOFTWARE TECHNOLOGY FOR ADAPTABLE, RELIABLE SYSTEMS (STARS) Technical Concept Document Central Archive for...February 1994 INFORMAL TECHNICAL REPORT For The SOFTWARE TECHNOLOGY FOR ADAPTABLE, RELIABLE SYSTEMS (STARS) Technical Concept Document Central Archive...accordance with the DFARS Special Works Clause Developed by: This document, developed under the Software Technology for Adaptable, Reliable Systems

  3. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  4. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  5. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  6. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  7. 48 CFR 212.211 - Technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  8. Emerging from Resistance: The Origins of the Virginia Technical College System

    ERIC Educational Resources Information Center

    Hodges, Richard Allen

    2016-01-01

    The purpose of this study was to explore factors leading to the founding of the Virginia Technical College System (VTCS). These factors are observed primarily within the timeframe of 1954-1966. The Virginia Community College System (VCCS) evolved from the Technical College System, and began in 1964. Classes started at the first technical colleges…

  9. Management of technical date in Nihon Doro kodan

    NASA Astrophysics Data System (ADS)

    Hanada, Jun'ichi

    Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.

  10. 77 FR 64464 - Information Systems Technical Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC... of export controls applicable to information systems equipment and technology. Wednesday, November 7...

  11. 76 FR 39845 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... export controls applicable to information systems equipment and technology. Wednesday, July 27 Public... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC...

  12. 78 FR 63162 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... of export controls applicable to information systems equipment and technology. Wednesday, November 6... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC...

  13. 75 FR 64258 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... export controls applicable to information systems equipment and technology. Wednesday, November 3 Public... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC...

  14. 78 FR 42753 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... of export controls applicable to information systems equipment and technology. Wednesday, July 31... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC...

  15. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  16. 77 FR 37652 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... that affect the level of export controls applicable to information systems equipment and technology... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC...

  17. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  18. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  19. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  20. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  1. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  2. Principles and Procedures in Technical Assistance: An Approach to Educational Change

    ERIC Educational Resources Information Center

    Lillie, David L.; Black, Talbot

    1976-01-01

    The Technical Assistance Development System (TADS) has developed through the years a system for technical assistance and has identified some important principles that should be followed in the operation of organizational support systems. (Author/ER)

  3. Guiding bioprocess design by microbial ecology.

    PubMed

    Volmer, Jan; Schmid, Andreas; Bühler, Bruno

    2015-06-01

    Industrial bioprocess development is driven by profitability and eco-efficiency. It profits from an early stage definition of process and biocatalyst design objectives. Microbial bioprocess environments can be considered as synthetic technical microbial ecosystems. Natural systems follow Darwinian evolution principles aiming at survival and reproduction. Technical systems objectives are eco-efficiency, productivity, and profitable production. Deciphering technical microbial ecology reveals differences and similarities of natural and technical systems objectives, which are discussed in this review in view of biocatalyst and process design and engineering strategies. Strategies for handling opposing objectives of natural and technical systems and for exploiting and engineering natural properties of microorganisms for technical systems are reviewed based on examples. This illustrates the relevance of considering microbial ecology for bioprocess design and the potential for exploitation by synthetic biology strategies. Copyright © 2015 Elsevier Ltd. All rights reserved.

  4. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  5. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  6. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  7. A Qualitative Study of the Job Challenges of Instructional Deans in the Technical College System of Georgia

    ERIC Educational Resources Information Center

    Alford, Perrin J.

    2014-01-01

    The Technical College System of Georgia serves the people and the state by creating a system of technical education whose purpose is to use the latest technology and easy access for all adult Georgians and corporate citizens. Within each technical college is a hierarchy of faculty, staff, and administrators. The instructional deans serve a vital…

  8. Method of identification of patent trends based on descriptions of technical functions

    NASA Astrophysics Data System (ADS)

    Korobkin, D. M.; Fomenkov, S. A.; Golovanchikov, A. B.

    2018-05-01

    The use of the global patent space to determine the scientific and technological priorities for the technical systems development (identifying patent trends) allows one to forecast the direction of the technical systems development and, accordingly, select patents of priority technical subjects as a source for updating the technical functions database and physical effects database. The authors propose an original method that uses as trend terms not individual unigrams or n-gram (usually for existing methods and systems), but structured descriptions of technical functions in the form “Subject-Action-Object” (SAO), which in the authors’ opinion are the basis of the invention.

  9. Electronic Inventory Systems and Barcode Technology: Impact on Pharmacy Technical Accuracy and Error Liability

    PubMed Central

    Oldland, Alan R.; May, Sondra K.; Barber, Gerard R.; Stolpman, Nancy M.

    2015-01-01

    Purpose: To measure the effects associated with sequential implementation of electronic medication storage and inventory systems and product verification devices on pharmacy technical accuracy and rates of potential medication dispensing errors in an academic medical center. Methods: During four 28-day periods of observation, pharmacists recorded all technical errors identified at the final visual check of pharmaceuticals prior to dispensing. Technical filling errors involving deviations from order-specific selection of product, dosage form, strength, or quantity were documented when dispensing medications using (a) a conventional unit dose (UD) drug distribution system, (b) an electronic storage and inventory system utilizing automated dispensing cabinets (ADCs) within the pharmacy, (c) ADCs combined with barcode (BC) verification, and (d) ADCs and BC verification utilized with changes in product labeling and individualized personnel training in systems application. Results: Using a conventional UD system, the overall incidence of technical error was 0.157% (24/15,271). Following implementation of ADCs, the comparative overall incidence of technical error was 0.135% (10/7,379; P = .841). Following implementation of BC scanning, the comparative overall incidence of technical error was 0.137% (27/19,708; P = .729). Subsequent changes in product labeling and intensified staff training in the use of BC systems was associated with a decrease in the rate of technical error to 0.050% (13/26,200; P = .002). Conclusions: Pharmacy ADCs and BC systems provide complementary effects that improve technical accuracy and reduce the incidence of potential medication dispensing errors if this technology is used with comprehensive personnel training. PMID:25684799

  10. Electronic inventory systems and barcode technology: impact on pharmacy technical accuracy and error liability.

    PubMed

    Oldland, Alan R; Golightly, Larry K; May, Sondra K; Barber, Gerard R; Stolpman, Nancy M

    2015-01-01

    To measure the effects associated with sequential implementation of electronic medication storage and inventory systems and product verification devices on pharmacy technical accuracy and rates of potential medication dispensing errors in an academic medical center. During four 28-day periods of observation, pharmacists recorded all technical errors identified at the final visual check of pharmaceuticals prior to dispensing. Technical filling errors involving deviations from order-specific selection of product, dosage form, strength, or quantity were documented when dispensing medications using (a) a conventional unit dose (UD) drug distribution system, (b) an electronic storage and inventory system utilizing automated dispensing cabinets (ADCs) within the pharmacy, (c) ADCs combined with barcode (BC) verification, and (d) ADCs and BC verification utilized with changes in product labeling and individualized personnel training in systems application. Using a conventional UD system, the overall incidence of technical error was 0.157% (24/15,271). Following implementation of ADCs, the comparative overall incidence of technical error was 0.135% (10/7,379; P = .841). Following implementation of BC scanning, the comparative overall incidence of technical error was 0.137% (27/19,708; P = .729). Subsequent changes in product labeling and intensified staff training in the use of BC systems was associated with a decrease in the rate of technical error to 0.050% (13/26,200; P = .002). Pharmacy ADCs and BC systems provide complementary effects that improve technical accuracy and reduce the incidence of potential medication dispensing errors if this technology is used with comprehensive personnel training.

  11. Creating a Canonical Scientific and Technical Information Classification System for NCSTRL+

    NASA Technical Reports Server (NTRS)

    Tiffany, Melissa E.; Nelson, Michael L.

    1998-01-01

    The purpose of this paper is to describe the new subject classification system for the NCSTRL+ project. NCSTRL+ is a canonical digital library (DL) based on the Networked Computer Science Technical Report Library (NCSTRL). The current NCSTRL+ classification system uses the NASA Scientific and Technical (STI) subject classifications, which has a bias towards the aerospace, aeronautics, and engineering disciplines. Examination of other scientific and technical information classification systems showed similar discipline-centric weaknesses. Traditional, library-oriented classification systems represented all disciplines, but were too generalized to serve the needs of a scientific and technically oriented digital library. Lack of a suitable existing classification system led to the creation of a lightweight, balanced, general classification system that allows the mapping of more specialized classification schemes into the new framework. We have developed the following classification system to give equal weight to all STI disciplines, while being compact and lightweight.

  12. Technical Assistance Model for Long-Term Systems Change: Three State Examples

    ERIC Educational Resources Information Center

    Kasprzak, Christina; Hurth, Joicey; Lucas, Anne; Marshall, Jacqueline; Terrell, Adriane; Jones, Elizabeth

    2010-01-01

    The National Early Childhood Technical Assistance Center (NECTAC) Technical Assistance (TA) Model for Long-Term Systems Change (LTSC) is grounded in conceptual frameworks in the literature on systems change and systems thinking. The NECTAC conceptual framework uses a logic model approach to change developed specifically for states' infant and…

  13. Vocational-Technical Education Financial Study. Executive Summary.

    ERIC Educational Resources Information Center

    Indiana State Board of Vocational and Technical Education, Indianapolis.

    A review of Indiana's current system of financing public vocational-technical education was limited to these concerns: the resource needs of vocational-technical education to keep the current delivery system up-to-date and the resources necessary to expand vocational-technical education services to those not being served. Although the current…

  14. 47 CFR 15.517 - Technical requirements for indoor UWB systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...

  15. 47 CFR 15.513 - Technical requirements for medical imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for medical imaging systems. 15.513 Section 15.513 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.513 Technical requirements for medical imaging systems. (a) The UWB...

  16. Matching Community and Technical College Professional/Technical Education Capacity to Employer Demand. Final Report.

    ERIC Educational Resources Information Center

    Sommers, Paul; Heg, Deena

    A project was conducted to improve the state of Washington's community and technical college system by developing and using an improved occupational forecasting system to assess and respond to education and training needs. First, long-term occupational forecast data from Washington's Employment Security Department were matched with technical and…

  17. A phenomenographic study of the ability to address complex socio-technical systems via variation theory

    NASA Astrophysics Data System (ADS)

    Mendoza Garcia, John A.

    Sometimes engineers fail when addressing the inherent complexity of socio-technical systems because they lack the ability to address the complexity of socio-technical systems. Teaching undergraduate engineering students how to address complex socio-technical systems, has been an educational endeavor at different levels ranging from kindergarten to post-graduate education. The literature presents different pedagogical strategies and content to reach this goal. However, there are no existing empirically-based assessments guided by a learning theory. This may be because at the same time explanations of how the skill is developed are scarce. My study bridges this gap, and I propose a developmental path for the ability to address the complex socio-technical systems via Variation Theory, and according to the conceptual framework provided by Variation Theory, my research question was "What are the various ways in which engineers address complex socio-technical systems?" I chose the research approach of phenomenography to answer my research question. I also chose to use a blended approach, Marton's approach for finding the dimensions of variation, and the developmental approach (Australian) for finding a hierarchical relationship between the dimensions. Accordingly, I recruited 25 participants with different levels of experience with addressing complex socio-technical systems and asked them all to address the same two tasks: A design of a system for a county, and a case study in a manufacturing firm. My outcome space is a nona-dimensional (nine) developmental path for the ability to address the complexity in socio-technical systems, and I propose 9 different ways of experiencing the complexity of a socio-technical system. The findings of this study suggest that the critical aspects that are needed to address the complexity of socio-technical systems are: being aware of the use of models, the ecosystem around, start recognizing different boundaries, being aware of time as a factor, recognizing the part-whole relationships, make effort in tailoring a solution that responds to stakeholders' needs, find the right problem, giving voice to others, and finally be aware of the need to iterate.

  18. 78 FR 1198 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on January 23 and 24, 2013, 9:00 a.m., at Qualcomm Incorporated, 5775 Morehouse Drive...

  19. 77 FR 1666 - Information Systems, Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems, Technical Advisory Committee; Notice of Partially Closed Meeting The Information Systems Technical Advisory Committee (ISTAC) will meet on January 25 and 26, 2012, 9 a.m., at Qualcomm Incorporated, 5775 Morehouse Drive, Building...

  20. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  1. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  2. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  3. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  4. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  5. Analysis of the Parameters Required for Performance Monitoring and Assessment of Military Communications Systems by Military Technical Controller

    DTIC Science & Technology

    1975-12-01

    139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters

  6. Work Values and Job Satisfaction of Arkansas Business Educators in Secondary Systems and Community/Technical Colleges.

    ERIC Educational Resources Information Center

    Funderburg, Dinnah L.; Kapes, Jerome T.

    The work values and job satisfaction of Arkansas business educators in secondary school systems and community/technical colleges were examined through a survey of a random sample of 129 of Arkansas' 926 secondary and community/technical college business educators. Of those teachers sent surveys (67 secondary and 62 community/technical college…

  7. Simulation of long-term influence from technical systems on permafrost with various short-scale and hourly operation modes in Arctic region

    NASA Astrophysics Data System (ADS)

    Vaganova, N. A.

    2017-12-01

    Technogenic and climatic influences have a significant impact on the degradation of permafrost. Long-term forecasts of such changes during long-time periods have to be taken into account in the oil and gas and construction industries in view to development the Arctic and Subarctic regions. There are considered constantly operating technical systems (for example, oil and gas wells) that affect changes in permafrost, as well as the technical systems that have a short-term impact on permafrost (for example, flare systems for emergency flaring of associated gas). The second type of technical systems is rather complex for simulation, since it is required to reserve both short and long-scales in computations with variable time steps describing the complex technological processes. The main attention is paid to the simulation of long-term influence on the permafrost from the second type of the technical systems.

  8. Automated dredging and disposal alternatives management system (ADDAMS). Environmental effects of dredging. Technical note

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This technical note describes the current capabilities and availability of the Automated Dredging and Disposal Alternatives Management System (ADDAMS). The technical note replaces the earlier Technical Note EEDP-06-12, which should be discarded. Planning, design, and management of dredging and dredged material disposal projects often require complex or tedious calculations or involve complex decision-making criteria. In addition, the evaluations often must be done for several disposal alternatives or disposal sites. ADDAMS is a personal computer (PC)-based system developed to assist in making such evaluations in a timely manner. ADDAMS contains a collection of computer programs (applications) designed to assist in managingmore » dredging projects. This technical note describes the system, currently available applications, mechanisms for acquiring and running the system, and provisions for revision and expansion.« less

  9. Owning the program technical baseline for future space systems acquisition: program technical baseline tracking tool

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.; Hant, James J.; Kizer, Justin R.; Min, Inki A.; Siedlak, Dennis J. L.; Yoh, James

    2017-05-01

    The U.S. Air Force (USAF) has recognized the needs for owning the program and technical knowledge within the Air Force concerning the systems being acquired to ensure success. This paper extends the previous work done by the authors [1-2] on the "Resilient Program Technical Baseline Framework for Future Space Systems" and "Portfolio Decision Support Tool (PDST)" to the development and implementation of the Program and Technical Baseline (PTB) Tracking Tool (PTBTL) for the DOD acquisition life cycle. The paper describes the "simplified" PTB tracking model with a focus on the preaward phases and discusses how to implement this model in PDST.

  10. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  11. 48 CFR 235.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reports. 235.010 Section 235.010 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.010 Scientific and technical reports. (b) For DoD, the Defense Technical Information Center is...

  12. 48 CFR 235.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reports. 235.010 Section 235.010 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.010 Scientific and technical reports. (b) For DoD, the Defense Technical Information Center is...

  13. 48 CFR 235.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reports. 235.010 Section 235.010 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.010 Scientific and technical reports. (b) For DoD, the Defense Technical Information Center is...

  14. 48 CFR 235.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reports. 235.010 Section 235.010 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.010 Scientific and technical reports. (b) For DoD, the Defense Technical Information Center is...

  15. 48 CFR 235.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reports. 235.010 Section 235.010 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.010 Scientific and technical reports. (b) For DoD, the Defense Technical Information Center is...

  16. Scope and Challenges of Technical Education: A Kerala Perspective

    ERIC Educational Resources Information Center

    Rahman, M. Abdul; Unnikrishnan, Ramesh

    2015-01-01

    Technical education contributes a major share to the overall education system and plays a vital role in the social and economic development of our nation. Since independence, the technical education system in our country has grown into a fairly large-sized system, offering opportunities for education and training in a wide variety of trades and…

  17. Development of a behavioural marker system for scrub practitioners' non-technical skills (SPLINTS system).

    PubMed

    Mitchell, Lucy; Flin, Rhona; Yule, Steven; Mitchell, Janet; Coutts, Kathy; Youngson, George

    2013-04-01

    Adverse events still occur despite ongoing efforts to reduce harm to patients. Contributory factors to adverse events are often due to limitations in clinicians' non-technical skills (e.g. communication, situation awareness), rather than deficiencies in technical competence. We developed a behavioural rating system to provide a structured means for teaching and assessing scrub practitioners' (i.e. nurse, technician, operating department practitioner) non-technical skills. Psychologists facilitated focus groups (n = 4) with experienced scrub practitioners (n = 16; 4 in each group) to develop a preliminary taxonomy. Focus groups reviewed lists of non-technical-skill-related behaviours that were extracted from an interview study. The focus groups labelled skill categories and elements and also provided examples of good and poor behaviours for those skills. An expert panel (n = 2 psychologists; n = 1 expert nurse) then used an iterative process to individually and collaboratively review and refine those data to produce a prototype skills taxonomy. A preliminary taxonomy containing eight non-technical skill categories with 28 underlying elements was produced. The expert panel reduced this to three categories (situation awareness, communication and teamwork, task management), each with three underlying elements. The system was called the Scrub Practitioners' List of Intraoperative Non-Technical Skills system. A scoring system and a user handbook were also developed. A prototype behavioural rating system for scrub practitioners' non-technical skills was developed, to aid in teaching and providing formative assessment. This important aspect of performance is not currently explicitly addressed in any educational route to qualify as a scrub practitioner. © 2012 Blackwell Publishing Ltd.

  18. 48 CFR 227.7102-2 - Rights in technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Rights in technical data... Technical Data 227.7102-2 Rights in technical data. (a) The clause at 252.227-7015, Technical Data—Commercial Items, provides the Government specific license rights in technical data pertaining to commercial...

  19. 78 FR 41331 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 225 Defense Federal Acquisition Regulation Supplement; Technical Amendments AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Final rule. SUMMARY: DoD is making technical amendment to the Defense...

  20. Bus Rapid Transit system’s influence on urban development: An inquiry to Boston and Seoul BRT systems’ technical characteristics

    NASA Astrophysics Data System (ADS)

    Prayogi, Lutfi

    2018-03-01

    This article explores the relation between bus rapid transit (BRT) system and urban development. This article was written through a multi-staged comprehensive literature review. It includes a general overview of widely acknowledged BRT technical characteristics. It explains the approach taken in understanding the relation between BRT system provision and urban development around the system. Findings regarding the influence of Boston Silver Line 4 and 5 and Seoul BRT systems on urban development around the systems are quoted and used as case studies. Investigation on the technical characteristics of Boston SL4/5 and Seoul BRT systems are provided. This article shows that the two BRT systems that influence urban development around the systems have technical characteristics that enable the BRT systems to have high performance. However, while the quoted BRT systems can influence urban development, they have significantly different performance.

  1. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  2. Technical review of the da Vinci surgical telemanipulator.

    PubMed

    Freschi, C; Ferrari, V; Melfi, F; Ferrari, M; Mosca, F; Cuschieri, A

    2013-12-01

    The da Vinci robotic surgical telemanipulator has been utilized in several surgical specialties for varied procedures, and the users' experiences have been widely published. To date, no detailed system technical analyses have been performed. A detailed review was performed of all publications and patents about the technical aspects of the da Vinci robotic system. Published technical literature on the da Vinci system highlight strengths and weaknesses of the robot design. While the system facilitates complex surgical operations and has a low malfunction rate, the lack of haptic (especially tactile) feedback and collisions between the robotic arms remain the major limitations of the system. Accurate, preplanned positioning of access ports is essential. Knowledge of the technical aspects of the da Vinci robot is important for optimal use. We confirmed the excellent system functionality and ease of use for surgeons without an engineering background. Research and development of the surgical robot has been predominant in the literature. Future trends address robot miniaturization and intelligent control design. Copyright © 2012 John Wiley & Sons, Ltd.

  3. 48 CFR 207.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...

  4. 48 CFR 207.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...

  5. 48 CFR 207.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...

  6. 48 CFR 207.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...

  7. 48 CFR 207.106 - Additional requirements for major systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...

  8. 48 CFR 216.402-2 - Technical performance incentives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical performance incentives. 216.402-2 Section 216.402-2 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contracts 216.402-2 Technical performance incentives. See PGI 216.402-2 for guidance on establishing...

  9. Microcomputer Intelligence for Technical Training (MITT): The evolution of an intelligent tutoring system

    NASA Technical Reports Server (NTRS)

    Norton, Jeffrey E.; Wiederholt, Bradley J.; Johnson, William B.

    1990-01-01

    Microcomputer Intelligence for Technical Training (MITT) uses Intelligent Tutoring System (OTS) technology to deliver diagnostic training in a variety of complex technical domains. Over the past six years, MITT technology has been used to develop training systems for nuclear power plant diesel generator diagnosis, Space Shuttle fuel cell diagnosis, and message processing diagnosis for the Minuteman missile. Presented here is an overview of the MITT system, describing the evolution of the MITT software and the benefits of using the MITT system.

  10. Reform of China's Technical and Vocational Education in the Transition from a Planned Economy System to a Socialist Market Economy System--A Case Study. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Yu, Zuguang; Zeng, Zida

    Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…

  11. 48 CFR 435.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 435.010 Scientific and technical reports... all scientific and technical reports to the National Technical Information Service at the address... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Scientific and technical...

  12. Teleoncology in the Department of Defense: a tale of two systems.

    PubMed

    Hunter, D C; Brustrom, J E; Goldsmith, B J; Davis, L J; Carlos, M; Ashley, E; Gardner, G; Gaal, I

    1999-01-01

    Two telemedicine networks were developed for the purpose of conducting multidisciplinary oncology ("teleoncology") conferences. The infrastructure of each system differed: one system was Internet-based; the other was delivered via Integrated Services Digital Network (ISDN) lines. The purpose of this study was to describe the infrastructure and cost, consultative process, technical aspects, and conference format of the two teleoncology programs. The two systems' technical aspects, participant satisfaction with the systems, and conference participation were compared qualitatively. Assessment of the technical aspects of the systems suggested that each had distinct advantages. Survey results indicated that provider satisfaction with the technical and logistical aspects of each type of teleoncology conference was high. The present study may prove helpful for individuals who are considering implementing their own teleoncology programs.

  13. Making intelligent systems team players: Overview for designers

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Schreckenghost, Debra L.

    1992-01-01

    This report is a guide and companion to the NASA Technical Memorandum 104738, 'Making Intelligent Systems Team Players,' Volumes 1 and 2. The first two volumes of this Technical Memorandum provide comprehensive guidance to designers of intelligent systems for real-time fault management of space systems, with the objective of achieving more effective human interaction. This report provides an analysis of the material discussed in the Technical Memorandum. It clarifies what it means for an intelligent system to be a team player, and how such systems are designed. It identifies significant intelligent system design problems and their impacts on reliability and usability. Where common design practice is not effective in solving these problems, we make recommendations for these situations. In this report, we summarize the main points in the Technical Memorandum and identify where to look for further information.

  14. A Technical Analysis Information Fusion Approach for Stock Price Analysis and Modeling

    NASA Astrophysics Data System (ADS)

    Lahmiri, Salim

    In this paper, we address the problem of technical analysis information fusion in improving stock market index-level prediction. We present an approach for analyzing stock market price behavior based on different categories of technical analysis metrics and a multiple predictive system. Each category of technical analysis measures is used to characterize stock market price movements. The presented predictive system is based on an ensemble of neural networks (NN) coupled with particle swarm intelligence for parameter optimization where each single neural network is trained with a specific category of technical analysis measures. The experimental evaluation on three international stock market indices and three individual stocks show that the presented ensemble-based technical indicators fusion system significantly improves forecasting accuracy in comparison with single NN. Also, it outperforms the classical neural network trained with index-level lagged values and NN trained with stationary wavelet transform details and approximation coefficients. As a result, technical information fusion in NN ensemble architecture helps improving prediction accuracy.

  15. NASA Technical Standards Program

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program's function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned-standards integration system. The Program maintains a 'one stop-shop' Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

  16. NASA Technical Standards Program

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, WIlliam W.

    2003-01-01

    The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program s function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned - standards integration system. The Program maintains a "one stop-shop" Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.

  17. 48 CFR 3419.870 - Acquisition of technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... competition to submit written technical proposals. Otherwise, ED holds oral discussions with the participating... participating in a limited technical competition based on the written technical proposals or oral discussions... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Acquisition of technical...

  18. Systems Engineering Awareness

    NASA Technical Reports Server (NTRS)

    Lucero, John

    2016-01-01

    The presentation will provide an overview of the fundamentals and principles of Systems Engineering (SE). This includes understanding the processes that are used to assist the engineer in a successful design, build and implementation of solutions. The context of this presentation will be to describe the involvement of SE throughout the life-cycle of a project from cradle to grave. Due to the ever growing number of complex technical problems facing our world, a Systems Engineering approach is desirable for many reasons. The interdisciplinary technical structure of current systems, technical processes representing System Design, Technical Management and Product Realization are instrumental in the development and integration of new technologies into mainstream applications. This tutorial will demonstrate the application of SE tools to these types of problems..

  19. Resource allocation and budgetary mechanisms for decentralized health systems: experiences from Balochistan, Pakistan.

    PubMed

    Green, A; Ali, B; Naeem, A; Ross, D

    2000-01-01

    This paper identifies key political and technical issues involved in the development of an appropriate resource allocation and budgetary system for the public health sector, using experience gained in the Province of Balochistan, Pakistan. The resource allocation and budgetary system is a critical, yet often neglected, component of any decentralization policy. Current systems are often based on historical incrementalism that is neither efficient nor equitable. This article describes technical work carried out in Balochistan to develop a system of resource allocation and budgeting that is needs-based, in line with policies of decentralization, and implementable within existing technical constraints. However, the development of technical systems, while necessary, is not a sufficient condition for the implementation of a resource allocation and decentralized budgeting system. This is illustrated by analysing the constraints that have been encountered in the development of such a system in Balochistan.

  20. Resource allocation and budgetary mechanisms for decentralized health systems: experiences from Balochistan, Pakistan.

    PubMed Central

    Green, A.; Ali, B.; Naeem, A.; Ross, D.

    2000-01-01

    This paper identifies key political and technical issues involved in the development of an appropriate resource allocation and budgetary system for the public health sector, using experience gained in the Province of Balochistan, Pakistan. The resource allocation and budgetary system is a critical, yet often neglected, component of any decentralization policy. Current systems are often based on historical incrementalism that is neither efficient nor equitable. This article describes technical work carried out in Balochistan to develop a system of resource allocation and budgeting that is needs-based, in line with policies of decentralization, and implementable within existing technical constraints. However, the development of technical systems, while necessary, is not a sufficient condition for the implementation of a resource allocation and decentralized budgeting system. This is illustrated by analysing the constraints that have been encountered in the development of such a system in Balochistan. PMID:10994286

  1. The Systems Test Architect: Enabling The Leap From Testable To Tested

    DTIC Science & Technology

    2016-09-01

    engineering process requires an interdisciplinary approach, involving both technical and managerial disciplines applied to the synthesis and integration...relationship between the technical and managerial aspects of systems engineering. TP-2003-020-01 describes measurement as having the following...it is evident that DOD makes great strides to tackle both the managerial and technical aspects of test and evaluation within the systems

  2. Conceptual Design of a Space-Based Multimegawatt MHD Power System, Task 1 Topical Report; Volume 1: Technical Discussion

    DTIC Science & Technology

    1988-01-01

    system requirements, design guidelines, and interface requirements has been prepared and included as Volume II of this Task 1 topical report. The Volume ...WAESD-TR-88-0002 Conceptual Design Of A Space-Based Multimegawatt MHD Power System ffA«kjjjjjTfc Task 1 Topical Report Volume I: Technical...Space-Based Multimegawatt MHD Power System: Task 1 Topical Report, Volume I: Technical Discussion Personal Author: Dana, RA. Corporate Author Or

  3. Reaching a 1.5°C target: socio-technical challenges for a rapid transition to low-carbon electricity systems.

    PubMed

    Eyre, Nick; Darby, Sarah J; Grünewald, Philipp; McKenna, Eoghan; Ford, Rebecca

    2018-05-13

    A 1.5°C global average target implies that we should no longer focus on merely incremental emissions reductions from the electricity system, but rather on fundamentally re-envisaging a system that, sooner rather than later, becomes carbon free. Many low-carbon technologies are surpassing mainstream predictions for both uptake and cost reduction. Their deployment is beginning to be disruptive within established systems. 'Smart technologies' are being developed to address emerging challenges of system integration, but their rates of future deployment remain uncertain. We argue that transition towards a system that can fully displace carbon generation sources will require expanding the focus of our efforts beyond technical solutions. Recognizing that change has social and technical dimensions, and that these interact strongly, we set out a socio-technical review that covers electricity infrastructure, citizens, business models and governance. It describes some of the socio-technical challenges that need to be addressed for the successful transition of the existing electricity systems. We conclude that a socio-technical understanding of electricity system transitions offers new and better insights into the potential and challenges for rapid decarbonization.This article is part of the theme issue 'The Paris Agreement: understanding the physical and social challenges for a warming world of 1.5°C above pre-industrial levels'. © 2018 The Author(s).

  4. 48 CFR 15.101-2 - Lowest price technically acceptable source selection process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Lowest price technically acceptable source selection process. 15.101-2 Section 15.101-2 Federal Acquisition Regulations System FEDERAL... Processes and Techniques 15.101-2 Lowest price technically acceptable source selection process. (a) The...

  5. 78 FR 70580 - Amphenol Backplane Systems, Including On-Site Leased Workers From Technical Needs and National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... Systems, Including On-Site Leased Workers From Technical Needs and National Engineering, Nashua, New... to the production of electrical connectors and backplane assemblies. The subject worker group includes on-site leased workers from Technical Needs and National Engineering. Workers of the subject firm...

  6. Critical Field Experiments on Uses of Scientific and Technical Information.

    ERIC Educational Resources Information Center

    Rubenstein, Albert H.; And Others

    Research in the field of "information-seeking behavior of scientists and engineers" has been done on the behavior and preferences of researchers with respect to technical literature, computer-based information systems, and other scientific and technical information (STI) systems and services. The objectives of this project are: (1) to…

  7. 48 CFR 435.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Scientific and technical reports. 435.010 Section 435.010 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 435.010 Scientific and technical reports. Research and development contracts shal...

  8. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  9. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  10. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  11. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  12. 48 CFR 1816.402-270 - NASA technical performance incentives.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA technical performance incentives. 1816.402-270 Section 1816.402-270 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND....402-270 NASA technical performance incentives. (a) Pursuant to the guidelines in 1816.402, NASA has...

  13. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for through D-wall imaging systems. 15.510 Section 15.510 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging...

  14. 78 FR 72673 - Midcontinent Independent System Operator, Inc.; Supplemental Notice Concerning Post-Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-2124-000] Midcontinent Independent System Operator, Inc.; Supplemental Notice Concerning Post-Technical Conference Comments As announced in the Notice of Technical Conference issued on October 25, 2013, and as required in the...

  15. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Government Technical Monitor (GTM). 642.271 Section 642.271 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government Technical Monitor (GTM). (a) Policy. The...

  16. 48 CFR 435.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Scientific and technical reports. 435.010 Section 435.010 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 435.010 Scientific and technical reports. Research and development contracts shal...

  17. 48 CFR 435.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Scientific and technical reports. 435.010 Section 435.010 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 435.010 Scientific and technical reports. Research and development contracts shal...

  18. 48 CFR 435.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Scientific and technical reports. 435.010 Section 435.010 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 435.010 Scientific and technical reports. Research and development contracts shal...

  19. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  20. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  1. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  2. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  3. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Systems engineering and... Organizational and Consultant Conflicts of Interest 209.571-7 Systems engineering and technical assistance contracts. (a) Agencies shall obtain advice on systems architecture and systems engineering matters with...

  4. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Systems engineering and... Organizational and Consultant Conflicts of Interest 209.571-7 Systems engineering and technical assistance contracts. (a) Agencies shall obtain advice on systems architecture and systems engineering matters with...

  5. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Systems engineering and... Organizational and Consultant Conflicts of Interest 209.571-7 Systems engineering and technical assistance contracts. (a) Agencies shall obtain advice on systems architecture and systems engineering matters with...

  6. 48 CFR 209.571-7 - Systems engineering and technical assistance contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Systems engineering and... Organizational and Consultant Conflicts of Interest 209.571-7 Systems engineering and technical assistance contracts. (a) Agencies shall obtain advice on systems architecture and systems engineering matters with...

  7. Transportation Systems Center Bibliography of Technical Reports

    DOT National Transportation Integrated Search

    1973-01-01

    The bibliography lists unlimited distribution reports released by the Transportation Systems Center from January through December 1978. It supplements the Transportation Systems Center Bibliography of Technical Reports, July 1970 - December 1976 (DOT...

  8. 76 FR 64083 - Reliability Technical Conference; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Technical Conference; Notice of Technical Conference Take notice that the Federal Energy Regulatory Commission will hold a Technical Conference on Tuesday, November 29, 2011, from 1 p.m. to 5 p.m. and... System. The conference will explore the progress made on the priorities for addressing risks to...

  9. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...

  10. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...

  11. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...

  12. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...

  13. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...

  14. Transportation Systems Center Bibliography of Technical Reports (Revision 1)

    DOT National Transportation Integrated Search

    1975-01-01

    The bibliography lists unlimited distribution reports released by the Transportation Systems Center from January through December 1978. It supplements the Transportation Systems Center Bibliography of Technical Reports, July 1970 - December 1976 (DOT...

  15. Modernization of the automation control system of technological processes at the preparation plant in the conditions of technical re-equipment

    NASA Astrophysics Data System (ADS)

    Lyakhovets, M. V.; Wenger, K. G.; Myshlyaev, L. P.; Shipunov, M. V.; Grachev, V. V.; Melkozerov, M. Yu; Fairoshin, Sh A.

    2018-05-01

    The experience of modernization of the automation control system of technological processes at the preparation plant under the conditions of technical re-equipment of the preparation plant “Barzasskoye Tovarischestvo” LLC (Berezovsky) is considered. The automated process control systems (APCS), the modernization goals and the ways to achieve them are indicated, the main subsystems of the integrated APCS are presented, the enlarged functional and technical structure of the upgraded system is given. The procedure for commissioning an upgraded system is described.

  16. Fiscal year 1979 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1979-01-01

    This bibliography lists approximately 590 formal NASA technical reports, papers published in technical journals, presentations by MSFC personnel, and reports of MSFC contractors introduced into the NASA scientific and technical information system in 1979.

  17. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  18. The National Early Childhood Technical Assistance Center Model for Long-Term Systems Change

    ERIC Educational Resources Information Center

    Kahn, Lynne; Hurth, Joicey; Kasprzak, Christina M.; Diefendorf, Martha J.; Goode, Susan E.; Ringwalt, Sharon S.

    2009-01-01

    The National Early Childhood Technical Assistance Center was charged by the U.S. Department of Education's Office of Special Education Programs from October 2001 through September 2006 to develop, implement, and evaluate an approach to technical assistance (TA) that would result in sustainable systems change in state early intervention and…

  19. 75 FR 59261 - Mandatory Reliability Standards for the Bulk Power System; Supplemental Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM06-16-010; RM06-16-011] Mandatory Reliability Standards for the Bulk Power System; Supplemental Notice of Technical Conference September 17, 2010. On August 19, 2010 the Federal Energy Regulatory Commission announced that a Technical...

  20. 75 FR 57764 - Mandatory Reliability Standards for the Bulk Power System; Supplemental Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. RM06-16-010; RM06-16-011] Mandatory Reliability Standards for the Bulk Power System; Supplemental Notice of Technical Conference September 14, 2010. On August 19, 2010 the Federal Energy Regulatory Commission announced that a Technical...

  1. State Practices in the Assessment of Outcomes for Students with Disabilities. Technical Report.

    ERIC Educational Resources Information Center

    Shriner, James G.; And Others

    This technical report describes the methodology, results, and conclusions of a 1991 survey, which was conducted to determine state efforts to develop systems to assess educational outcomes, states' needs for solutions to technical/implementation problems, existing databases, and efforts of states to design a comprehensive system of indicators in…

  2. 78 FR 24061 - Minimum Technical Standards for Class II Gaming Systems and Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Register that established technical standards for ensuring the integrity of electronic Class II games and aids. 73 FR 60508, Oct. 10, 2008. The technical standards were designed to assist tribal gaming... Class II gaming systems. The standards did not classify which games were Class II games and which games...

  3. Learning Computing Topics in Undergraduate Information Systems Courses: Managing Perceived Difficulty

    ERIC Educational Resources Information Center

    Wall, Jeffrey D.; Knapp, Janice

    2014-01-01

    Learning technical computing skills is increasingly important in our technology driven society. However, learning technical skills in information systems (IS) courses can be difficult. More than 20 percent of students in some technical courses may dropout or fail. Unfortunately, little is known about students' perceptions of the difficulty of…

  4. Electrification Futures Study: A Technical Evaluation of the Impacts of an

    Science.gov Websites

    Technical Evaluation of the Impacts of an Electrified U.S. Energy System Electrification Futures Study: A Technical Evaluation of the Impacts of an Electrified U.S. Energy System Illustration showing various impacts of widespread electrification in the United States. In addition to NREL, the research team

  5. Central Radar System, Over-the-Horizon Backscatter

    DTIC Science & Technology

    1990-03-09

    1,2-Dibromo-3- chloropropane (DBCP) 0.3 TABLE 41-6 (Continued). MINNESOTA RECOMMENDED ALLOWABLE LIMITS (RAL) FOR DRINKING WATER WELLS Compound RAL (ug/ 1 ...TABLE OF CONTENTS ENVIRONMENTAL IMPACT ANALYSIS PROCESS OVERVIEW ............ TECHNICAL STUDY 1 FACILITIES...TECHNICAL STUDY 10 0 TECHNICAL STUDY 1 CENTRAL RADAR SYSTEM OVER-THE-HORIZON BACKSCATTER RADAR PROGRAM 0 ENVIRONMENTAL IMPACT

  6. Technical Manual: easyCBM. Technical Report #1408

    ERIC Educational Resources Information Center

    Anderson, Daniel; Alonzo, Julie; Tindal, Gerald; Farley, Dan; Irvin, P. Shawn; Lai, Cheng-Fei; Saven, Jessica L.; Wray, Kraig A.

    2014-01-01

    Since the easyCBM© learning system was first published in 2006, over $8 million of federal funding (both from the Office of Special Education Programs and more recently from the Institute of Education Sciences) has been used to develop, study, and refine the assessments available on the system. This Technical Manual summarizes the ongoing research…

  7. A Qualitative Content Analysis of Information Dissemination during the Consolidation of Two Technical Colleges

    ERIC Educational Resources Information Center

    Drinnon, Charles

    2017-01-01

    This research examined the ways and means administration used to disseminate information concerning the consolidation of two technical colleges in the State of Georgia, USA. These means of information dissemination included press releases by the consolidating colleges and the Technical College System of Georgia (the system which the consolidating…

  8. 48 CFR 801.602-82 - Documents to submit for legal or technical review-general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... legal or technical review-general. 801.602-82 Section 801.602-82 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career... review—general. Table 801.602-82 specifies the documents that must be submitted when a legal or technical...

  9. The Effect of Functional Flow Diagrams on Apprentice Aircraft Mechanics' Technical System Understanding.

    ERIC Educational Resources Information Center

    Johnson, Scott D.; Satchwell, Richard E.

    1993-01-01

    Describes an experimental study that tested the impact of a conceptual illustration on college students' understanding of the structure, function, and behavior of complex technical systems. The use of functional flow diagrams in aircraft mechanics' training is explained, a concept map analysis is discussed, and implications for technical training…

  10. Space Shuttle Technical Conference, Part 2

    NASA Technical Reports Server (NTRS)

    Chaffee, Norman (Compiler)

    1985-01-01

    The retrospective presentation provides technical disciplinary focus in the following technical areas: (1) integrated avionics; (2) guidance, navigation, and control; (3) aerodynamics; (4) structures; (5) life support, environmental control, and crew station; (6) ground operations; (7) propulsion and power; (8) communications and tracking; (9) mechanics and mechanical systems; and (10) thermal and contamination environments and protection systems.

  11. TADS and Technical Assistance: Readings on System Design, Needs Assessment, Consultation, and Evaluation.

    ERIC Educational Resources Information Center

    Trohanis, Pascal L., Ed.

    The document reviews the technical assistance process used by TADS (Technical Assistance Development System), a project to provide support to HCEEP (Handicapped Children's Early Education Program) demonstration projects serving young handicapped children and their families. Chapter 1, by P. Trohanis, focuses on a number of questions that people…

  12. 48 CFR 825.870 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical assistance. 825... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Other International Agreements and Coordination 825.870 Technical assistance. Contracting officers may obtain technical information or guidance on international agreements and...

  13. Transportation Systems Center Bibliography of Technical Reports : January - December 1977

    DOT National Transportation Integrated Search

    1978-01-01

    The bibliography lists unlimited distribution reports released by the Transportation Systems Center from January through December 1977. It supplements the Transportation Systems Center Bibliography of Technical Reports, July 1970 - December 1976 (DOT...

  14. Transportation Systems Center Bibliography of Technical Reports, January-December, 1978

    DOT National Transportation Integrated Search

    1979-03-01

    The bibliography lists unlimited distribution reports released by the Transportation Systems Center from January through December 1978. It supplements the Transportation Systems Center Bibliography of Technical Reports, July 1970 - December 1976 (DOT...

  15. Technical solutions for mitigating security threats caused by health professionals in clinical settings.

    PubMed

    Fernandez-Aleman, Jose Luis; Belen Sanchez Garcia, Ana; Garcia-Mateos, Gines; Toval, Ambrosio

    2015-08-01

    The objective of this paper is to present a brief description of technical solutions for health information system security threats caused by inadequate security and privacy practices in healthcare professionals. A literature search was carried out in ScienceDirect, ACM Digital Library and IEEE Digital Library to find papers reporting technical solutions for certain security problems in information systems used in clinical settings. A total of 17 technical solutions were identified: measures for password security, the secure use of e-mail, the Internet, portable storage devices, printers and screens. Although technical safeguards are essential to the security of healthcare organization's information systems, good training, awareness programs and adopting a proper information security policy are particularly important to prevent insiders from causing security incidents.

  16. Security credentials management system (SCMS) design and analysis for the connected vehicle system : draft.

    DOT National Transportation Integrated Search

    2013-12-27

    This report presents an analysis by Booz Allen Hamilton (Booz Allen) of the technical design for the Security Credentials Management System (SCMS) intended to support communications security for the connected vehicle system. The SCMS technical design...

  17. The Design and Transfer of Advanced Command and Control (C2) Computer-Based Systems

    DTIC Science & Technology

    1980-03-31

    TECHNICAL REPORT 80-02 QUARTERLY TECHNICAL REPORT: THE DESIGN AND TRANSFER OF ADVANCED COMMAND AND CONTROL (C 2 ) COMPUTER-BASED SYSTEMS ARPA...The Tasks/Objectives and/or Purposes of the overall project are connected with the design , development, demonstration and transfer of advanced...command and control (C2 ) computer-based systems; this report covers work in the computer-based design and transfer areas only. The Technical Problems thus

  18. 47 CFR 22.383 - In-building radiation systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for...

  19. 76 FR 6690 - Highway Systems; Technical Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...-2011-0003] RIN 2125-AF35 Highway Systems; Technical Correction AGENCIES: Federal Highway Administration... correction to the regulations that govern the designation of routes on the National Highway System and the Dwight D. Eisenhower System of Interstate and Defense Highways. The amendments contained herein make no...

  20. 77 FR 18914 - National Motor Vehicle Title Information System (NMVTIS): Technical Corrections

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... 1121-AA79 National Motor Vehicle Title Information System (NMVTIS): Technical Corrections AGENCY... (OJP) is promulgating this direct final rule for its National Motor Vehicle Title Information System... INFORMATION CONTACT paragraph. II. Background The National Motor Vehicle Title Information System was...

  1. Minnesota Technical College System: Library/Media Services Survey and Report.

    ERIC Educational Resources Information Center

    Olson, Lynette

    This document presents a report on the Minnesota Technical College System's Library and Media Services. All 34 technical colleges were given a survey to prepare, a Library Advisory Board was established, and relevant literature and standards were reviewed to conduct and obtain data for this study. The report begins with the mission, values, and…

  2. Agency, Socio-Cultural Context, and the Role of the Technical Communicator during IT Adoption: A Case Study in Innovation Diffusion across Cultures

    ERIC Educational Resources Information Center

    Coggio, Grace Leinbach

    2010-01-01

    This dissertation examines the diffusion of an innovative information technology system across multiple cultures between 2000 and 2006. Developed and implemented by technical communicators in the technical communication department of a global medical device company, the Advanced Single-Source Authoring and Publication System (ASAPS) brought…

  3. 25 CFR 547.6 - What are the minimum technical standards for enrolling and enabling Class II gaming system...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and enabling Class II gaming system components? 547.6 Section 547.6 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN SERVICES MINIMUM TECHNICAL STANDARDS FOR GAMING EQUIPMENT USED WITH THE PLAY OF CLASS II GAMES § 547.6 What are the minimum technical standards for enrolling and...

  4. National Profiles in Technical and Vocational Education in Asia and the Pacific: Nepal.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific and Cultural Organization, Bangkok (Thailand). Principal Regional Office for Asia and the Pacific.

    One of a series of studies on the development of technical and vocational education in the member states of UNESCO, this report profiles the educational system in Nepal. The four parts of the document provide general information about the following: the country; the history, goals, and structure of the educational system; vocational technical and…

  5. Technical and Vocational Education Transformation in Malaysia: Shaping the Future Leaders

    ERIC Educational Resources Information Center

    Sauffie, Nur Fatin Binti Mohd

    2015-01-01

    In accordance with the concept of lifelong education, the Technical and Vocational Education (TVE) system is one flaw of that is recognized or known as a system whose role is to develop individuals with high technical skills as desired by the industry nowadays. Changing times and technology development at this time require changes to the TVET…

  6. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...

  7. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...

  8. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  9. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  10. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  11. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  12. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  13. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  14. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Government Technical... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government Technical Monitor (GTM). (a) Policy. The contracting officer may appoint a Government Technical Monitor (GTM...

  15. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  16. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  17. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  18. The Role of the U.S. Government Technical Report in Aeronautics: An Exploratory Study

    DTIC Science & Technology

    1988-08-01

    survey questionnaire. 14 23. Technical Discipline -- for purposes of this study technical disciplines include aeronautics, astronautics, chemistry ...report varies because it serves different roles in communicating within and between organizations. The technical report has been defined etymologically ...and Information Systems - Administrative/Management - Other o Technical Discipline * - Aeronautics - Astronautics - Chemistry and Materials

  19. The Library Work Order Processing System: A New Approach to Motivate Employees and to Increase Production in the Technical Service Department of Mercer County Community College Library. Applied Educational Research and Evaluation.

    ERIC Educational Resources Information Center

    Sim, Yong Sup

    After reviewing the current movement toward job enrichment, a system was designed for the technical services department of the Mercer County Community College Library. The Library Work Order Processing System, as tried between January and March, 1974, was designed to permit each worker more variety of jobs. The technical services department was…

  20. Placing Tactical Data into the MIST and LC2IEDM Systems

    DTIC Science & Technology

    2003-10-01

    Defence R& D Canada DEFENCE DÉFENSE & Placing Tactical Data into the MIST and LC2IEDM Systems Anthony W. Isenor Technical Memorandum DRDC Atlantic TM...intentionally left blank. Copy No: Placing Tactical Data into the MIST and LC2IEDM Systems Anthony W. Isenor Defence R& D Canada – Atlantic Technical...currently underway at Defence R& D Canada – Atlantic, as well as international efforts with The Technical Cooperation Program (TTCP). Both groups

  1. Evolution of the Nebraska Technical Community College System.

    ERIC Educational Resources Information Center

    Johnston, Thomas S.; Simpson, Mary Margaret

    An overview is provided of the historical development, organizational structure, and programs and services of the Nebraska Technical Community College (TCC) System. First, statutory provisions establishing the TCC system and defining its priorities are cited, explaining that the system was established to create locally governed and supported…

  2. System engineering of the Atacama Large Millimeter/submillimeter Array

    NASA Astrophysics Data System (ADS)

    Bhatia, Ravinder; Marti, Javier; Sugimoto, Masahiro; Sramek, Richard; Miccolis, Maurizio; Morita, Koh-Ichiro; Arancibia, Demián.; Araya, Andrea; Asayama, Shin'ichiro; Barkats, Denis; Brito, Rodrigo; Brundage, William; Grammer, Wes; Haupt, Christoph; Kurlandczyk, Herve; Mizuno, Norikazu; Napier, Peter; Pizarro, Eduardo; Saini, Kamaljeet; Stahlman, Gretchen; Verzichelli, Gianluca; Whyborn, Nick; Yagoubov, Pavel

    2012-09-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) will be composed of 66 high precision antennae located at 5000 meters altitude in northern Chile. This paper will present the methodology, tools and processes adopted to system engineer a project of high technical complexity, by system engineering teams that are remotely located and from different cultures, and in accordance with a demanding schedule and within tight financial constraints. The technical and organizational complexity of ALMA requires a disciplined approach to the definition, implementation and verification of the ALMA requirements. During the development phase, System Engineering chairs all technical reviews and facilitates the resolution of technical conflicts. We have developed analysis tools to analyze the system performance, incorporating key parameters that contribute to the ultimate performance, and are modeled using best estimates and/or measured values obtained during test campaigns. Strict tracking and control of the technical budgets ensures that the different parts of the system can operate together as a whole within ALMA boundary conditions. System Engineering is responsible for acceptances of the thousands of hardware items delivered to Chile, and also supports the software acceptance process. In addition, System Engineering leads the troubleshooting efforts during testing phases of the construction project. Finally, the team is conducting System level verification and diagnostics activities to assess the overall performance of the observatory. This paper will also share lessons learned from these system engineering and verification approaches.

  3. Hydrogen turbine power conversion system assessment

    NASA Technical Reports Server (NTRS)

    Wright, D. E.; Lucci, A. D.; Campbell, J.; Lee, J. C.

    1978-01-01

    A three part technical study was conducted whereby parametric technical and economic feasibility data were developed on several power conversion systems suitable for the generation of central station electric power through the combustion of hydrogen and the use of the resulting heat energy in turbogenerator equipment. The study assessed potential applications of hydrogen-fueled power conversion systems and identified the three most promising candidates: (1) Ericsson Cycle, (2) gas turbine, and (3) direct steam injection system for fossil fuel as well as nuclear powerplants. A technical and economic evaluation was performed on the three systems from which the direct injection system (fossil fuel only) was selected for a preliminary conceptual design of an integrated hydrogen-fired power conversion system.

  4. Fiscal year 1981 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Thacker, S. S. (Compiler)

    1981-01-01

    This bibliography lists approximately 503 formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY-1981. It also includes papers of MSFC contractors. Citations announced in the NASA scientific and technical information system are noted.

  5. 48 CFR 1252.242-73 - Contracting officer's technical representative.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical representative. 1252.242-73 Section 1252.242-73 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1252.242-73 Contracting officer's technical representative. As prescribed in (TAR) 48 CFR 1242.7000(d), insert the following clause: Contracting Officer's Technical Representative (OCT 1994) (a...

  6. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  7. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  8. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  9. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  10. 48 CFR 825.902-70 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical assistance. 825... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Customs and Duties 825.902-70 Technical assistance. Should the... officer should contact the nearest U.S. Customs and Boarder Protection office for technical assistance...

  11. Engineering Lessons Learned and Systems Engineering Applications

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.

    2005-01-01

    Systems Engineering is fundamental to good engineering, which in turn depends on the integration and application of engineering lessons learned. Thus, good Systems Engineering also depends on systems engineering lessons learned from within the aerospace industry being documented and applied. About ten percent of the engineering lessons learned documented in the NASA Lessons Learned Information System are directly related to Systems Engineering. A key issue associated with lessons learned datasets is the communication and incorporation of this information into engineering processes. As part of the NASA Technical Standards Program activities, engineering lessons learned datasets have been identified from a number of sources. These are being searched and screened for those having a relation to Technical Standards. This paper will address some of these Systems Engineering Lessons Learned and how they are being related to Technical Standards within the NASA Technical Standards Program, including linking to the Agency's Interactive Engineering Discipline Training Courses and the life cycle for a flight vehicle development program.

  12. Technical and economic viability of automated highway systems : preliminary analysis

    DOT National Transportation Integrated Search

    1997-01-01

    Technical and economic investigations of automated highway systems (AHS) are addressed. It has generally been accepted that such systems show potential to alleviate urban traffic congestion, so most of the AHS research has been focused instead on tec...

  13. A socio-technical model to explore urban water systems scenarios.

    PubMed

    de Haan, Fjalar J; Ferguson, Briony C; Deletic, Ana; Brown, Rebekah R

    2013-01-01

    This article reports on the ongoing work and research involved in the development of a socio-technical model of urban water systems. Socio-technical means the model is not so much concerned with the technical or biophysical aspects of urban water systems, but rather with the social and institutional implications of the urban water infrastructure and vice versa. A socio-technical model, in the view purported in this article, produces scenarios of different urban water servicing solutions gaining or losing influence in meeting water-related societal needs, like potable water, drainage, environmental health and amenity. The urban water system is parameterised with vectors of the relative influence of each servicing solution. The model is a software implementation of the Multi-Pattern Approach, a theory on societal systems, like urban water systems, and how these develop and go through transitions under various internal and external conditions. Acknowledging that social dynamics comes with severe and non-reducible uncertainties, the model is set up to be exploratory, meaning that for any initial condition several possible future scenarios are produced. This article gives a concise overview of the necessary theoretical background, the model architecture and some initial test results using a drainage example.

  14. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    ERIC Educational Resources Information Center

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  15. The Role of Formal Education, Technical and Management Training on Information Systems (IS) Managers' Managerial Effectiveness as Perceived by Their Subordinates

    ERIC Educational Resources Information Center

    Ligon, Jerry; Abdullah, ABM; Talukder, Majharul

    2007-01-01

    This study examined the relationship between Information Systems (IS) managers' formal education, level of technical and managerial training and their managerial effectiveness as perceived by their subordinates. The study finds that there is a strong positive relationship between the amount of technical training IS managers have received and their…

  16. Rotorcraft System Identification (Identification des Systemes de Voilures Tournantes)

    DTIC Science & Technology

    1991-10-01

    the NATO community; - Providing scientific and technical advice and assistance to the Military Committee in the field of aerospace research and...common defence posture, - Improving the co-operation among member nations in aerospace research and development. - Exchange of scientific and...technical information; - Prcviding assistance to member nations for the purpose of increasing their scientific and technical potential, - Rendenng scientific

  17. Curriculum Development System for Navy Technical Training.

    ERIC Educational Resources Information Center

    Butler, Lucius

    Documentation for the U.S. Navy's curriculum development system is brought together in this paper, beginning with a description of the Naval Technical Training System. This description includes the Navy Training Plan (NTP) process, which is the current mechanism for introducing new courses; the organization and administration of the system; the…

  18. Student Flow Model SFM-IA: System Documentation. Technical Report 41B. Preliminary Edition.

    ERIC Educational Resources Information Center

    Busby, John C.; Johnson, Richard S.

    Technical specifications, operating procedures, and reference information for the National Center for Higher Education Management Systems' (NCHEMS) Student Flow Model (SFM) computer programs are presented. Included are narrative descriptions of the system and its modules, specific program documentation for each of the modules, system flowcharts,…

  19. 77 FR 40634 - Solicitation for a Cooperative Agreement: Pretrial Technical Assistance for Evidence-Based...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ...: Pretrial Technical Assistance for Evidence-Based Decision Making in Local Criminal Justice Systems AGENCY... NIC initiative, Evidence-Based Decision Making (EBDM) in Local Criminal Justice Systems. Work under... individual system planning activities. These change strategies are critical to meeting their system's harm...

  20. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  1. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  2. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  3. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  4. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  5. Bridging the Gap Between the Social and the Technical: The Enrolment of Socio-Technical Information Architects to Cope with the Two-Level Model of EPR Systems.

    PubMed

    Pedersen, Rune

    2017-01-01

    This is a project proposal derived from an urge to re-define the governance of ICT in healthcare towards regional and national standardization of the patient pathways. The focus is on a two-levelled approach for governing EPR systems where the clinicians' model structured variables and patient pathways. The overall goal is a patient centric EPR portfolio. This paper define and enlighten the need for establishing the socio- technical architect role necessary to obtain the capabilities of a modern structured EPR system. Clinicians are not capable to moderate between the technical and the clinical.

  6. Exploration Medical System Technical Development

    NASA Technical Reports Server (NTRS)

    McGuire, K.; Middour, C.; Cerro, J.; Burba, T.; Hanson, A.; Reilly, J.; Mindock, J.

    2017-01-01

    The Exploration Medical Capability (ExMC) Element systems engineering goals include defining the technical system needed to implement exploration medical capabilities for Mars. This past year, scenarios captured in the medical system concept of operations laid the foundation for systems engineering technical development work. The systems engineering team analyzed scenario content to identify interactions between the medical system, crewmembers, the exploration vehicle, and the ground system. This enabled the definition of functions the medical system must provide and interfaces to crewmembers and other systems. These analyses additionally lead to the development of a conceptual medical system architecture. The work supports the ExMC community-wide understanding of the functional exploration needs to be met by the medical system, the subsequent development of medical system requirements, and the system verification and validation approach utilizing terrestrial analogs and precursor exploration missions.

  7. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract. (d) All technical direction shall be issued in writing by the COR. (e) The Contractor must... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  8. 48 CFR 3052.242-72 - Contracting officer's technical representative.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... functions of a technical nature. The Contracting Officer will provide a written notice of such designation... technical representative. 3052.242-72 Section 3052.242-72 Federal Acquisition Regulations System DEPARTMENT... PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.242-72 Contracting officer's technical...

  9. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  10. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  11. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  12. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  13. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  14. 48 CFR 247.270-2 - Technical provisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical provisions. 247...-Related Services 247.270-2 Technical provisions. (a) Because conditions vary at different ports, and sometimes within the same port, it is not practical to develop standard technical provisions covering all...

  15. The National Shipbuilding Research Program. Proceedings of the REAPS Technical Symposium. Paper No. 20: Application of the GIFTS-5 Minibased Graphics System for Ship Design and Analysis

    DTIC Science & Technology

    1979-09-01

    Proceedings of the REAPS Technical Symposium Paper No. 20: Application of the GIFTS -5 Minibased Graphics System for Ship Design and Analysis U.S...The National Shipbuilding Research Program Proceedings of the REAPS Technical Symposium Paper No. 20: Application of the GIFTS -5 Minibased Graphics...MERCHANTABILITY AND/OR FITNESS FOR PURPOSE ARE SPECIFICALLY DISCLAIMED. APPLICATION OF THE GIFTS -5 MINIBASED GRAPHICS SYSTEM FOR SHIP DESIGN AND ANALYSIS Dr

  16. Necessity of creating digital tools to ensure efficiency of technical means

    NASA Astrophysics Data System (ADS)

    Rakov, V. I.; Zakharova, O. V.

    2018-05-01

    The authors estimated the problems of functioning of technical objects. The article notes that the increasing complexity of automation systems may lead to an increase of the redundant resource in proportion to the number of components and relationships in the system, and to the need of the redundant resource constant change that can make implementation of traditional structures with redundancy unnecessarily costly (Standby System, Fault Tolerance, High Availability). It proposes the idea of creating digital tools to ensure efficiency of technical facilities.

  17. Ahuachapan geothermal project: a technical and economic assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloomster, C.H.; DiPippo; Kuwada, J.T.

    Theeconomic and technical factors involved in using geothermal energy at Ahuachapan are examined. The experience at Ahuachapan is evaluated in relation to conditions prevailing in El Salvador and to conditions in the U.S. technical characteristics considered are: geological characteristics, well programs and gathering system, well productivity and geofluid characteristics, and energy conversion systems. Economic factors considered for El Salvador are: construction costs; environmental control costs; operating experience and costs; financing; taxes, subsidies, or incentives; marketing; and electrical system characteristics. (MHR)

  18. Feasibility Study for a Computerized Serials Control System in the Defense Communications Agency Technical and Management Information Center.

    DTIC Science & Technology

    1984-06-20

    AD-A162 ±88 FEASIBILITY STUDY FOR A COMPUTERIZED SERIALS CONTROL 1/1 SYSTEM IN THE DEFENS (U) DEFENSE COMMUNICATIONS AGENCY WASHINGTON DC TECHNICAL...NATIONAL BUREAU OF STANDARDS- 1963-A 0FEASIBILITY STUDY FOR A COMPUTERIZED SERIALS CONTROL SYSTEM IN THE DEFENSE COMMUNICATIONS 0AGENCY TECHNICAL AND...ABSTRACT 21. ABSTRACT SECURITY CLASSIFICATION UNCLASSIFIED/UNLIMITED R1 SAME AS RPT. 0 DTIC USERS 0 UNCLASSIFIED 22&. NAME OF RESPONSIBLE INDIVIDUAL 22b

  19. Assessment of the Technical Training Received by Source Selection Participants in Air Force Systems Command.

    DTIC Science & Technology

    1986-09-01

    60 48.4 Systems 200/400 15 12.1 Contract Administration (PPM 152) 13 10.5 Logistics Management (Log 224) 2 1.6 Government Contract Law (PPM 302) 20...detail. 1. Systems 200/400 2. Contract Administration (PPM 152) 3. Logistics Management (LOG 224) 4. Government Contract Law (PPM 302) 5. Technical...152 Contract Administration o Log 224 Logistics Management o PPM 302 Government Contract Law o QMT 345 Quantitative Technical, Cost, and Price Analysis

  20. Test and Evaluation of the Navy Technical Information Presentation System (NTIPS) F-14A Field Test Results

    DTIC Science & Technology

    1988-09-01

    Test and Evaluation Report Test and Evaluation of the Navy Technical Information Presentation System (NTIPS) F-14A Field Test Results by .0 Joseph J...PROGRAM PROJECT TASK WORK UNIT Washington, D.C. 20361 ELEMENT NO. NO. NO. ACCESSION NO. OMN 1820 11. TITLE (Include Security Classification) TEST AND...EVALUATION OF THE NAVY TECHNICAL INFORMATION PRESENTATION SYSTEM (NTIPS) F-14A FIELD TEST RESULTS 12. PERSONAL AUTHOR(S) Fuller, Joseph F. (DTRC) Post

  1. NASA/Army Rotorcraft Technology. Volume 1: Aerodynamics, and Dynamics and Aeroelasticity

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The Conference Proceedings is a compilation of over 30 technical papers presented at this milestone event which reported on the advances in rotorcraft technical knowledge resulting from NASA, Army, and industry rotorcraft research programs over the last 5 to 10 years. The Conference brought together over 230 government, industry, and allied nation conferees to exchange technical information and hear invited technical papers by prominent NASA, Army, and industry researchers covering technology topics which included: aerodynamics, dynamics and elasticity, propulsion and drive systems, flight dynamics and control, acoustics, systems integration, and research aircraft.

  2. Gateway National Recreational Area - Sandy Hook Unit : automated fee entrance plaza and intelligent transportation system technical requirements

    DOT National Transportation Integrated Search

    2009-01-01

    The Volpe National Transportation Systems Center (Volpe Center) is providing technical : support to Sandy Hook, a unit of the Gateway National Recreation Area, in the planning and : concept development for possible Intelligent Transportation Systems ...

  3. Echoes That Never Were: American Mobile Intercontinental Ballistic Missiles, 1956-1983

    DTIC Science & Technology

    2006-05-11

    research, develop, operate, maintain, and sustain complex technological systems , ICBMs were--and remain--a system blending technical matters, scientific ...maintain, and sustain complex technological systems , ICBMs were--and remain--a system blending technical matters, scientific laws, economic...technological system that blended scientific laws, economic realities, political forces, and social concerns that included environmentalism and

  4. Electronic data generation and display system

    NASA Technical Reports Server (NTRS)

    Wetekamm, Jules

    1988-01-01

    The Electronic Data Generation and Display System (EDGADS) is a field tested paperless technical manual system. The authoring provides subject matter experts the option of developing procedureware from digital or hardcopy inputs of technical information from text, graphics, pictures, and recorded media (video, audio, etc.). The display system provides multi-window presentations of graphics, pictures, animations, and action sequences with text and audio overlays on high resolution color CRT and monochrome portable displays. The database management system allows direct access via hierarchical menus, keyword name, ID number, voice command or touch of a screen pictoral of the item (ICON). It contains operations and maintenance technical information at three levels of intelligence for a total system.

  5. Developing Human Resources for the Technical Workforce: A Comparative Study of Korea and Thailand

    ERIC Educational Resources Information Center

    Hawley, Joshua D.; Paek, Jeeyon

    2005-01-01

    Asian countries face significant and growing shortages of technically skilled workers. Vocational-technical systems are key components of national human resource development. Using labor market data from Thailand and Korea, this paper analyzes the economic payoff for individual investment in vocational-technical education, and subsequent…

  6. 78 FR 27963 - Reliability Technical Conference; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-6-000] Reliability Technical Conference; Notice of Technical Conference Take notice that the Federal Energy Regulatory... related to the reliability of the Bulk-Power System. A more formal agenda will be issued at a later date...

  7. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Trade, business, technical... Contracts With Commercial Organizations 31.205-43 Trade, business, technical, and professional activity costs. The following types of costs are allowable: (a) Memberships in trade, business, technical, and...

  8. Initiatives in Technical and Further Education. Numbers 3 and 4.

    ERIC Educational Resources Information Center

    National TAFE Clearinghouse, Adelaide (Australia).

    These two issues contain abstracts of 127 and 118 documents, respectively, related to the field of technical and further education that are available through the Australian Technical and Further Education (TAFE) Clearinghouse system. These types of materials are included: research reports/technical reports, evaluation studies, curriculum materials…

  9. Waukesha County Technical College 1998 Comprehensive Annual Financial Report.

    ERIC Educational Resources Information Center

    Tessmann, Cary A.

    Waukesha County Technical College (WCTC) is one of 16 institutions in the Wisconsin Technical College System. The college offers associate of applied science degree programs, technical diplomas and certificates, apprenticeship programs and other adult education services. This financial report covers fiscal year 1998 and is divided into four…

  10. Assessing Students' Technical Skill Attainment

    ERIC Educational Resources Information Center

    Jorgensen, Haley

    2010-01-01

    The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…

  11. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical data-Commercial... of Provisions And Clauses 252.227-7015 Technical data—Commercial items. As prescribed in 227.7102-3(a)(1), use the following clause: Technical Data—Commercial Items (NOV 1995) (a) Definitions. As used in...

  12. 48 CFR 1552.237-71 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (d) Technical direction will be issued in writing or confirmed in writing within five (5) days after... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Technical direction. 1552... Technical direction. As prescribed in 1537.110, insert a clause substantially the same as the following...

  13. 77 FR 47501 - Applications for New Awards; Technical Assistance on State Data Collection, Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... Awards; Technical Assistance on State Data Collection, Analysis, and Reporting--National IDEA Technical Assistance Center on Early Childhood Longitudinal Data Systems; Notice #0;#0;Federal Register / Vol. 77 , No... for New Awards; Technical Assistance on State Data Collection, Analysis, and Reporting--National IDEA...

  14. An Input Evaluation of Three Technical Assistance Needs Assessment Strategies.

    ERIC Educational Resources Information Center

    Suarez, Tanya M.; Cox, James O.

    The Technical Assistance Development System--TADS (a project to provide technical assistance to personnel implementing programs for preschool handicapped children and their families) conducted an evaluation of three technical assistance needs assessment strategies during 1979-80. The three strategies were: (1) on-site--conducted by a trained needs…

  15. Advanced Public Transportation Systems. Technical Assistance Brief 2

    DOT National Transportation Integrated Search

    1993-01-01

    The Advanced Public Transportation Systems (APTS) Program requires evaluation : of pilot projects. This technical assistance brief discusses the guidelines set : for developing evaluation framework and methodology for local projects. 4p.

  16. NASA Technical Interchange Meeting (TIM): Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box

    NASA Technical Reports Server (NTRS)

    ONeil, D. A.; Craig, D. A.; Christensen, C. B.; Gresham, E. C.

    2005-01-01

    The objective of this Technical Interchange Meeting was to increase the quantity and quality of technical, cost, and programmatic data used to model the impact of investing in different technologies. The focus of this meeting was the Technology Tool Box (TTB), a database of performance, operations, and programmatic parameters provided by technologists and used by systems engineers. The TTB is the data repository used by a system of models known as the Advanced Technology Lifecycle Analysis System (ATLAS). This report describes the result of the November meeting, and also provides background information on ATLAS and the TTB.

  17. The Development and Technical Adequacy of Seventh-Grade Reading Comprehension Measures in a Progress Monitoring Assessment System. Technical Report #1102

    ERIC Educational Resources Information Center

    Park, Bitnara Jasmine; Alonzo, Julie; Tindal, Gerald

    2011-01-01

    This technical report describes the process of development and piloting of reading comprehension measures that are appropriate for seventh-grade students as part of an online progress screening and monitoring assessment system, http://easycbm.com. Each measure consists of an original fictional story of approximately 1,600 to 1,900 words with 20…

  18. Economic Returns to Sub-Baccalaureate Technical Education: A Study of Labor Market Outcomes for Manufacturing Engineering Technologist and Technician Education (METTE) Programs in the Wisconsin Technical College System

    ERIC Educational Resources Information Center

    Matheny, Christopher J.

    2013-01-01

    The purpose of this study is to examine the labor market outcomes of sub-baccalaureate education for individuals attending Manufacturing Engineering Technologist and Technician Education (METTE) programs in the Wisconsin Technical College System. Increasingly, public policy for postsecondary education and economic development, as well as decisions…

  19. The intellectual information system for management of geological and technical arrangements during oil field exploitation

    NASA Astrophysics Data System (ADS)

    Markov, N. G.; E Vasilyeva, E.; Evsyutkin, I. V.

    2017-01-01

    The intellectual information system for management of geological and technical arrangements during oil fields exploitation is developed. Service-oriented architecture of its software is a distinctive feature of the system. The results of the cluster analysis of real field data received by means of this system are shown.

  20. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 6: IPAD system development and operation

    NASA Technical Reports Server (NTRS)

    Redhed, D. D.; Tripp, L. L.; Kawaguchi, A. S.; Miller, R. E., Jr.

    1973-01-01

    The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.

  1. Approval of Modified Seating Systems Initially Approved Under A Technical Standard Order

    DOT National Transportation Integrated Search

    1997-06-03

    The Advisory Circular (AC) provides information, clarification, and procedural : guidance concerning the approval and installation of modified Technical Standard : Order (TSO) seating systems in U.S. type certificated aircraft.

  2. 47 CFR 76.1717 - Compliance with technical standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with technical standards. Each system operator shall be prepared to show, on request by an authorized representative of the Commission or the local franchising authority, that the system does, in fact, comply with...

  3. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  4. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  5. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  6. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  7. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  8. Decision Support System for Aquifer Recharge (AR) and ...

    EPA Pesticide Factsheets

    Aquifer recharge (AR) is a technical method being utilized to enhance groundwater resources through man-made replenishment means, such as infiltration basins and injections wells. Aquifer storage and recovery (ASR) furthers the AR techniques by withdrawal of stored groundwater at a later time for beneficial use. It is a viable adaptation technique for water availability problems. Variants of the water storage practices include recharge through urban green infrastructure and the subsurface injection of reclaimed water, i.e., wastewater, which has been treated to remove solids and impurities. In addition to a general overview of ASR variations, this report focuses on the principles and technical basis for an ASR decision support system (DSS), with the necessary technical references provided. The DSS consists of three levels of tools and methods for ASR system planning and assessment, design, and evaluation. Level 1 of the system is focused on ASR feasibility, for which four types of data and technical information are organized around: 1) ASR regulations and permitting needs, 2) Water demand projections, 3) Climate change and water availability, and 4) ASR sites and technical information. These technical resources are integrated to quantify water availability gaps and the feasibility of using ASR to meet the volume and timing of the water resource shortages. A systemic analysis of water resources was conducted for sustainable water supplies in Las Vegas, Nevada f

  9. Training and Maintaining System-Wide Reliability in Outcome Management.

    PubMed

    Barwick, Melanie A; Urajnik, Diana J; Moore, Julia E

    2014-01-01

    The Child and Adolescent Functional Assessment Scale (CAFAS) is widely used for outcome management, for providing real time client and program level data, and the monitoring of evidence-based practices. Methods of reliability training and the assessment of rater drift are critical for service decision-making within organizations and systems of care. We assessed two approaches for CAFAS training: external technical assistance and internal technical assistance. To this end, we sampled 315 practitioners trained by external technical assistance approach from 2,344 Ontario practitioners who had achieved reliability on the CAFAS. To assess the internal technical assistance approach as a reliable alternative training method, 140 practitioners trained internally were selected from the same pool of certified raters. Reliabilities were high for both practitioners trained by external technical assistance and internal technical assistance approaches (.909-.995, .915-.997, respectively). 1 and 3-year estimates showed some drift on several scales. High and consistent reliabilities over time and training method has implications for CAFAS training of behavioral health care practitioners, and the maintenance of CAFAS as a global outcome management tool in systems of care.

  10. The design and implementation of the Technical Facilities Controller (TFC) for the Goldstone deep space communications complex

    NASA Technical Reports Server (NTRS)

    Killian, D. A.; Menninger, F. J.; Gorman, T.; Glenn, P.

    1988-01-01

    The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.

  11. A new generation of real-time DOS technology for mission-oriented system integration and operation

    NASA Technical Reports Server (NTRS)

    Jensen, E. Douglas

    1988-01-01

    Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.

  12. 78. View of radar systems technical publication library, transmitter building ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    78. View of radar systems technical publication library, transmitter building no. 102, second floor. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  13. Norm-Aware Socio-Technical Systems

    NASA Astrophysics Data System (ADS)

    Savarimuthu, Bastin Tony Roy; Ghose, Aditya

    The following sections are included: * Introduction * The Need for Norm-Aware Systems * Norms in human societies * Why should software systems be norm-aware? * Case Studies of Norm-Aware Socio-Technical Systems * Human-computer interactions * Virtual environments and multi-player online games * Extracting norms from big data and software repositories * Norms and Sustainability * Sustainability and green ICT * Norm awareness through software systems * Where To, From Here? * Conclusions

  14. Proceedings: Computer Science and Data Systems Technical Symposium, volume 1

    NASA Technical Reports Server (NTRS)

    Larsen, Ronald L.; Wallgren, Kenneth

    1985-01-01

    Progress reports and technical updates of programs being performed by NASA centers are covered. Presentations in viewgraph form are included for topics in three categories: computer science, data systems and space station applications.

  15. 76 FR 69296 - Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite... Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite--Update to... Reactor Systems Engineer, Technical Specifications Branch, Mail Stop: O-7 C2A, Division of Inspection and...

  16. National Leaders in Innovation. Washington's Community and Technical Colleges

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2015

    2015-01-01

    Washington's community and technical colleges set a national example for innovative policies, practices and research for student success. Washington's community and technical college system ranks 12th in the nation for graduation rates, and 7th for certificates and degrees produced. Olympic College and Renton Technical College in March 2015 were…

  17. 48 CFR 2452.237-73 - Conduct of Work and Technical Guidance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... conditions of the contract. (c) The GTR will issue technical guidance in writing or, if issued orally, he/she... Technical Guidance. 2452.237-73 Section 2452.237-73 Federal Acquisition Regulations System DEPARTMENT OF... Provisions and Clauses 2452.237-73 Conduct of Work and Technical Guidance. As prescribed in 2437.110(d...

  18. A Case Study of Technical Assistance to Demonstration Programs for Young Handicapped Children. Part II.

    ERIC Educational Resources Information Center

    Behr, Shirley K.; And Others

    A project to provide technical assistance to staffs of two demonstration programs for preschool handicapped children and their families is described. The focus was technical assistance developed and exercised by the Technical Assistance Development System (TADS), which assisted in the development of the Handicapped Children's Early Education…

  19. A Case Study of Technical Assistance to Demonstration Programs for Young Handicapped Children. Part I.

    ERIC Educational Resources Information Center

    Behr, Shirley K.; And Others

    The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…

  20. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  1. Productivity and technical efficiency of suckler beef production systems: trends for the period 1990 to 2012.

    PubMed

    Veysset, P; Lherm, M; Roulenc, M; Troquier, C; Bébin, D

    2015-12-01

    Over the past 23 years (1990 to 2012), French beef cattle farms have expanded in size and increased labour productivity by over 60%, chiefly, though not exclusively, through capital intensification (labour-capital substitution) and simplifying herd feeding practices (more concentrates used). The technical efficiency of beef sector production systems, as measured by the ratio of the volume value (in constant euros) of farm output excluding aids to volume of intermediate consumption, has fallen by nearly 20% while income per worker has held stable thanks to subsidies and the labour productivity gains made. This aggregate technical efficiency of beef cattle systems is positively correlated to feed self-sufficiency, which is in turn negatively correlated to farm and herd size. While volume of farm output per hectare of agricultural area has not changed, forage feed self-sufficiency decreased by 6 percentage points. The continual increase in farm size and labour productivity has come at a cost of lower production-system efficiency - a loss of technical efficiency that 20 years of genetic, technical, technological and knowledge-driven progress has barely managed to offset.

  2. IT Labs Proof-of-Concept Project: Technical Data Interoperability (TDI) Pathfinder Via Emerging Standards

    NASA Technical Reports Server (NTRS)

    Conroy, Mike; Gill, Paul; Ingalls, John; Bengtsson, Kjell

    2014-01-01

    No known system is in place to allow NASA technical data interoperability throughout the whole life cycle. Life Cycle Cost (LCC) will be higher on many developing programs if action isn't taken soon to join disparate systems efficiently. Disparate technical data also increases safety risks from poorly integrated elements. NASA requires interoperability and industry standards, but breaking legacy ways is a challenge.

  3. The Development of Technical and Vocational Education in India--A Case Study in Quality Improvement. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Mishra, Arun K.

    Education has a place of high priority on India's development agenda. The technical/vocational education (TVE) system is multisectoral with each ministry responsible for labor force development in that sector. The TVE programs in the formal education system are either state delivered or financed. The higher secondary vocational education program…

  4. Reducing Risk in DoD Software-Intensive Systems Development

    DTIC Science & Technology

    2016-03-01

    intensive systems development risk. This research addresses the use of the Technical Readiness Assessment (TRA) using the nine-level software Technology...The software TRLs are ineffective in reducing technical risk for the software component development. • Without the software TRLs, there is no...effective method to perform software TRA or reduce the technical development risk. The software component will behave as a new, untried technology in nearly

  5. An analysis of the technical status of high level radioactive waste and spent fuel management systems

    NASA Technical Reports Server (NTRS)

    English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.

    1977-01-01

    The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

  6. A Case Study on the Status of Technical and Vocational Education in Thailand. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Shoolap, Charoon; Choomnoom, Siripan

    This two-part report presents an overview of the vocational and technical education system in Thailand. The first part is a review of the current and likely future situations pertaining to vocational and technical education in that country. An analysis of economic conditions, human resource development, and the existing technical and vocational…

  7. Construction of In-house Databases in a Corporation

    NASA Astrophysics Data System (ADS)

    Okuda, Yasukazu; Yoshikawa, Ichirou; Sasano, Fumio

    The authors describe the outline and the construction process of the in-house technical information system of Mitsui Petrochemical Industries Ltd., “MITOLIS”. This system was constructed in 1981 and has been improved since then to make better use of in-house technical reports. Bibliographic data and keywords of technical reports of R & D division are stored in the host computer system in Iwakuni and can be retrieved by the company members on the desk-side terminal connected to the local area network (LAN). The number of stored reports reaches 6100 from 1970 to 1987.

  8. MITT writer and MITT writer advanced development: Developing authoring and training systems for complex technical domains

    NASA Technical Reports Server (NTRS)

    Wiederholt, Bradley J.; Browning, Elica J.; Norton, Jeffrey E.; Johnson, William B.

    1991-01-01

    MITT Writer is a software system for developing computer based training for complex technical domains. A training system produced by MITT Writer allows a student to learn and practice troubleshooting and diagnostic skills. The MITT (Microcomputer Intelligence for Technical Training) architecture is a reasonable approach to simulation based diagnostic training. MITT delivers training on available computing equipment, delivers challenging training and simulation scenarios, and has economical development and maintenance costs. A 15 month effort was undertaken in which the MITT Writer system was developed. A workshop was also conducted to train instructors in how to use MITT Writer. Earlier versions were used to develop an Intelligent Tutoring System for troubleshooting the Minuteman Missile Message Processing System.

  9. 76 FR 61293 - Extension of Public Comment Period: Mandatory Reporting of Greenhouse Gases: Technical Revisions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... Electronics Manufacturing and the Petroleum and Natural Gas Systems Categories of the Greenhouse Gas Reporting...: Technical Revisions to the Electronics Manufacturing and the Petroleum and Natural Gas Systems Categories of... to the Electronics Manufacturing and the Petroleum and Natural Gas Systems Categories of the...

  10. Chameleon or Phoenix: The Metamorphosis of TAFE.

    ERIC Educational Resources Information Center

    Anderson, Damon

    1998-01-01

    Examines aspects of the history of technical and vocational education (TAFE) in Australia: technical education system in Victoria; dissolution of the binary system in higher education; and new instructional discourses and practices shaping TAFE. Speculates on the potential reemergence of the binary system and future prospects for TAFE. (SK)

  11. 40 CFR 35.3535 - Authorized set-aside activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... demonstrate how the purchase of land or easements will protect the source water of the system from... ASSISTANCE STATE AND LOCAL ASSISTANCE Drinking Water State Revolving Funds § 35.3535 Authorized set-aside... DWSRF program and to provide technical assistance to public water systems. (c) Small systems technical...

  12. 40 CFR 35.3535 - Authorized set-aside activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... demonstrate how the purchase of land or easements will protect the source water of the system from... ASSISTANCE STATE AND LOCAL ASSISTANCE Drinking Water State Revolving Funds § 35.3535 Authorized set-aside... DWSRF program and to provide technical assistance to public water systems. (c) Small systems technical...

  13. The Nihongo Tutorial System: An Intelligent Tutoring System for Technical Japanese Language Instruction.

    ERIC Educational Resources Information Center

    Maciejewski, Anthony A.; Leung, Nelson K.

    1992-01-01

    The Nihongo Tutorial System is designed to assist English-speaking scientists and engineers in acquiring reading proficiency in Japanese technical literature. It provides individualized lessons that match interest area/language ability with available materials that are encoded with syntactic, phonetic, and morphological information. (14…

  14. Technical Specifications of the Nihongo Tutorial System.

    ERIC Educational Resources Information Center

    Leung, Kei Wai; Maciejewski, Anthony A.

    The Nihongo tutorial system is an intelligent tutorial system designed to use a computer to assist scientists and engineers in developing reading competence in technical Japanese. It consists of three applications: the Nihongo Tutor, which provides useful information about an article (translation, syntax, pronunciation) to help understand the text…

  15. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Legal and technical review... 801.602-80 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and...

  16. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  17. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  18. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  19. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  20. 77 FR 58421 - Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...

  1. 77 FR 16869 - Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...

  2. 25 CFR 547.15 - What are the minimum technical standards for electronic data communications between system...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... data communications between system components? 547.15 Section 547.15 Indians NATIONAL INDIAN GAMING... AND EQUIPMENT § 547.15 What are the minimum technical standards for electronic data communications between system components? (a) Sensitive data. Communication of sensitive data must be secure from...

  3. 25 CFR 547.15 - What are the minimum technical standards for electronic data communications between system...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... data communications between system components? 547.15 Section 547.15 Indians NATIONAL INDIAN GAMING... AND EQUIPMENT § 547.15 What are the minimum technical standards for electronic data communications between system components? (a) Sensitive data. Communication of sensitive data must be secure from...

  4. Technical and Economic Feasibility Study of At-Grade Concrete Slab Track for Urban Rail Transit Systems

    DOT National Transportation Integrated Search

    1981-08-01

    The report presents work conducted to evaluate the technical and economic feasibility of using concrete slab track systems for at-grade transit track. The functions of a rail transit track system are to guide railway vehicles and provide a safe and a...

  5. Assessing Nurse Anaesthetists' Non-Technical Skills in the operating room.

    PubMed

    Lyk-Jensen, H T; Jepsen, R M H G; Spanager, L; Dieckmann, P; Østergaard, D

    2014-08-01

    Incident reporting and fieldwork in operating rooms have shown that some of the errors that arise in anaesthesia relate to inadequate use of non-technical skills. To provide a tool for training and feedback on nurse anaesthetists' non-technical skills, this study aimed to adapt the Anaesthetists' Non-Technical Skills (ANTS) as a behavioural marker system for the formative assessment of nurse anaesthetists' non-technical skills in the operating room. A qualitative approach with focus group interviews was used to identify the non-technical skills of nurse anaesthetists in the operating room. The interview data were transcribed verbatim. Directed content analysis was used to code and sort data deductively into the ANTS categories: task management, team working, situation awareness and decision making. The prototype named Nurse Anaesthetists' Non-Technical Skills (N-ANTS) was presented and discussed in a group of subject matter experts to ensure face validity. The N-ANTS system consists of the same four categories as ANTS and 15 underlying elements. Three to five good and poor behavioural markers for each element were identified. The headings and definitions of the categories and elements were adjusted to encompass the behavioural markers in N-ANTS. The differences that emerged mainly reflected statements regarding the establishment of role, competence, and task delegation. A behavioural marker system, N-ANTS, for nurse anaesthetists was adapted from a behavioural marker system, ANTS, for anaesthesiologists. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  6. Engineering the System and Technical Integration

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.

    2011-01-01

    Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.

  7. Core Technical Capability Laboratory Management System

    NASA Technical Reports Server (NTRS)

    Shaykhian, Linda; Dugger, Curtis; Griffin, Laurie

    2008-01-01

    The Core Technical Capability Lab - oratory Management System (CTCLMS) consists of dynamically generated Web pages used to access a database containing detailed CTC lab data with the software hosted on a server that allows users to have remote access.

  8. Assessment of lightweight mobile nuclear power systems. [for airborne vehicles

    NASA Technical Reports Server (NTRS)

    Anderson, J. L.; Rom, F. E.

    1973-01-01

    A review was made of lightweight mobile nuclear power systems (LMNPS). Data cover technical feasibility studies of LMNPS and airborne vehicles, mission studies, and non-technical conditions that are required to develop and use LMNPS.

  9. Energy. Application of solar energy in dwellings: A technical and economical analysis for the European community

    NASA Astrophysics Data System (ADS)

    1980-03-01

    The technical possibilities and economical limitations of solar heating systems for the application in swimming pools, hot water preparation, space heating and air conditioning were investigated. This analysis was performed for dwellings with special consideration of the climatic differences in each community. The computer program, which was used for solar system calculations, and all mathematical models, for technical and economical analysis were elucidated. In the technical and economical analysis, the most suitable solar system sizes for each community was determined. Four types of solar collectors were investigated. The single glass selective collector proved to be the most cost effective collector in all the above applications, provided the the additional cost for the selective coating is not more than 20DM/cu. From the results of the analysis certain recommendations were derived, which can improve the rapid implementation of solar heating systems into the market.

  10. Satellite power system concept development and evaluation program. Volume 1: Technical assessment summary report

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Candidate satellite power system (SPS) concepts were identified and evaluated in terms of technical and cost factors. A number of alternative technically feasible approaches and system concepts were investigated. A reference system was defined to facilitate economic, environmental, and societal assessments by the Department of Energy. All elements of the reference system were defined including the satellite and all its subsystems, the orbital construction and maintenance bases, all elements of the space transportation system, the ground receiving station, and the associated industrial facilities for manufacturing the required hardware. The reference conclusions and remaining issues are stated for the following topical areas: system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.

  11. NATO Guidelines on Human Engineering Testing and Evaluation

    DTIC Science & Technology

    2001-05-01

    1980s and is known as Manpower, Personnel, and Training Integration (MANPRINT). The objective of this comprehensive management and technical effort is...systems under benign test conditions, using test subjects who are considerably more knowledeable of the system than the eventual users of the system will...Technical Management , Aeronautical Systems Division, Air Force Systems Command. Itoh, Y., Hayashi, Y., Tsukui, L, and Saito, S. (1989). Heart rate

  12. Investigating surety methodologies for cognitive systems.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caudell, Thomas P.; Peercy, David Eugene; Mills, Kristy

    2006-11-01

    Advances in cognitive science provide a foundation for new tools that promise to advance human capabilities with significant positive impacts. As with any new technology breakthrough, associated technical and non-technical risks are involved. Sandia has mitigated both technical and non-technical risks by applying advanced surety methodologies in such areas as nuclear weapons, nuclear reactor safety, nuclear materials transport, and energy systems. In order to apply surety to the development of cognitive systems, we must understand the concepts and principles that characterize the certainty of a system's operation as well as the risk areas of cognitive sciences. This SAND report documentsmore » a preliminary spectrum of risks involved with cognitive sciences, and identifies some surety methodologies that can be applied to potentially mitigate such risks. Some potential areas for further study are recommended. In particular, a recommendation is made to develop a cognitive systems epistemology framework for more detailed study of these risk areas and applications of surety methods and techniques.« less

  13. 24 CFR 902.68 - Technical review of results of PHAS Indicators #1 or #4.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... both reviews, a request for technical review must be submitted in writing to the Director of the Real... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical review of results of PHAS... HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING ASSESSMENT SYSTEM PHAS Scoring § 902.68 Technical review of...

  14. Risk factors for technical failure of endoscopic double self-expandable metallic stent placement by partial stent-in-stent method.

    PubMed

    Kawakubo, Kazumichi; Kawakami, Hiroshi; Toyokawa, Yoshihide; Otani, Koichi; Kuwatani, Masaki; Abe, Yoko; Kawahata, Shuhei; Kubo, Kimitoshi; Kubota, Yoshimasa; Sakamoto, Naoya

    2015-01-01

    Endoscopic double self-expandable metallic stent (SEMS) placement by the partial stent-in-stent (PSIS) method has been reported to be useful for the management of unresectable hilar malignant biliary obstruction. However, it is technically challenging, and the optimal SEMS for the procedure remains unknown. The aim of this study was to identify the risk factors for technical failure of endoscopic double SEMS placement for unresectable malignant hilar biliary obstruction (MHBO). Between December 2009 and May 2013, 50 consecutive patients with MHBO underwent endoscopic double SEMS placement by the PSIS method. We retrospectively evaluated the rate of successful double SEMS placement and identified the risk factors for technical failure. The technical success rate for double SEMS placement was 82.0% (95% confidence interval [CI]: 69.2-90.2). On univariate analysis, the rate of technical failure was high in patients with metastatic disease and unilateral placement. Multivariate analysis revealed that metastatic disease was a significant risk factor for technical failure (odds ratio: 9.63, 95% CI: 1.11-105.5). The subgroup analysis after double guidewire insertion showed that the rate of technical success was higher in the laser-cut type SEMS with a large mesh and thick delivery system than in the braided type SEMS with a small mesh and thick delivery system. Metastatic disease was a significant risk factor for technical failure of double SEMS placement for unresectable MHBO. The laser-cut type SEMS with a large mesh and thin delivery system might be preferable for the PSIS procedure. © 2014 Japanese Society of Hepato-Biliary-Pancreatic Surgery.

  15. HOPE information system review

    NASA Astrophysics Data System (ADS)

    Suzuki, Yoshiaki; Nishiyama, Kenji; Ono, Shuuji; Fukuda, Kouin

    1992-08-01

    An overview of the review conducted on H-2 Orbiting Plane (HOPE) is presented. A prototype model was constructed by inputting various technical information proposed by related laboratories. Especially operation flow which enables understanding of correlation between various analysis items, judgement criteria, technical data, and interfaces with others was constructed. Technical information data base and retrieval systems were studied. A Macintosh personal computer was selected for information shaping because of its excellent function, performance, operability, and software completeness.

  16. Satellite power system concept development and evaluation program system definition technical assessment report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-12-01

    The results of the system definition studies conducted by NASA as a part of the Department of Energy/National Aeronautics and Space Administration SPS Concept Development and Evaluation Program are summarized. The purpose of the system definition efforts was to identify and define candidate SPS concepts and to evaluate the concepts in terms of technical and cost factors. Although the system definition efforts consisted primarily of evaluation and assessment of alternative technical approaches, a reference system was also defined to facilitate economic, environmental, and societal assessments by the Department of Energy. This reference system was designed to deliver 5 GW ofmore » electrical power to the utility grid. Topics covered include system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.« less

  17. MHD program plan, FY 1991

    NASA Astrophysics Data System (ADS)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  18. ITS/CVO technical project management for non-technical managers : participant guide

    DOT National Transportation Integrated Search

    1998-09-01

    In 1996, the FHWA Office of Motor Carriers (OMC) identified the need to develop a Technical Training Program to support the deployment of Intelligent Transportation System (ITS) technologies for Commercial Vehicle Operations (CVO). The workforce -...

  19. 76 FR 27274 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 225 Defense Federal Acquisition Regulation Supplement; Technical Amendments AGENCY: Defense Acquisition Regulations System... Federal Acquisition Regulation Supplement (DFARS) to direct contracting officers to additional guidance on...

  20. Proceedings: Computer Science and Data Systems Technical Symposium, volume 2

    NASA Technical Reports Server (NTRS)

    Larsen, Ronald L.; Wallgren, Kenneth

    1985-01-01

    Progress reports and technical updates of programs being performed by NASA centers are covered. Presentations in viewgraph form, along with abstracts, are included for topics in three catagories: computer science, data systems, and space station applications.

  1. AHMCT Intelligent Roadway Information System (IRIS) technical support and testing

    DOT National Transportation Integrated Search

    2011-12-31

    This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...

  2. Technical, Managerial and Financial (TMF) Capacity Resources for Small Drinking Water Systems

    EPA Pesticide Factsheets

    Resources are available to help public water systems build the technical, managerial and financial (TMF) capacity. TMF capacity is necessary to achieve and maintain long-term sustainability and compliance with national safe drinking water regulations.

  3. AHMCT Intelligent Roadway Information System (IRIS) technical support and testing.

    DOT National Transportation Integrated Search

    2011-12-01

    This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...

  4. Conceptualizing the Organizational Role of Technical Communicators: A Systems Approach.

    ERIC Educational Resources Information Center

    Harrison, Teresa M.; Debs, Mary Beth

    1988-01-01

    Uses a systems approach to organizational theory to argue that technical communicators function as "boundary spanners," who make sense of and disseminate information required for coordination between organizational groups, and for effective responses to the environment. (JAD)

  5. Automated water monitor system field demonstration test report. Volume 2: Technical summary

    NASA Technical Reports Server (NTRS)

    Brooks, R. L.; Jeffers, E. L.; Perreira, J.; Poel, J. D.; Nibley, D.; Nuss, R. H.

    1981-01-01

    The NASA Automatic Water Monitor System was installed in a water reclamation facility to evaluate the technical and cost feasibility of producing high quality reclaimed water. Data gathered during this field demonstration test are reported.

  6. System Control Facilities: Head-Ends and Central Processors. A Survey of Technical Requirements for Broadband Cable Teleservices; Volume Four.

    ERIC Educational Resources Information Center

    Smith, Ernest K.; And Others

    The system control facilities in broadband communication systems are discussed in this report. These facilities consist of head-ends and central processors. The first section summarizes technical problems and needs, and the second offers a cursory overview of systems, along with an incidental mention of processors. Section 3 looks at the question…

  7. Technical Feasibility Assessment of Lunar Base Mission Scenarios

    NASA Astrophysics Data System (ADS)

    Magelssen, Trygve ``Spike''; Sadeh, Eligar

    2005-02-01

    Investigation of the literature pertaining to lunar base (LB) missions and the technologies required for LB development has revealed an information gap that hinders technical feasibility assessment. This information gap is the absence of technical readiness levels (TRL) (Mankins, 1995) and information pertaining to the criticality of the critical enabling technologies (CETs) that enable mission success. TRL is a means of identifying technical readiness stages of a technology. Criticality is defined as the level of influence the CET has on the mission scenario. The hypothesis of this research study is that technical feasibility is a function of technical readiness and technical readiness is a function of criticality. A newly developed research analysis method is used to identify the technical feasibility of LB mission scenarios. A Delphi is used to ascertain technical readiness levels and CET criticality-to-mission. The research analysis method is applied to the Delphi results to determine the technical feasibility of the LB mission scenarios that include: observatory, science research, lunar settlement, space exploration gateway, space resource utilization, and space tourism. The CETs identified encompasses four major system level technologies of: transportation, life support, structures, and power systems. Results of the technical feasibility assessment show the observatory and science research LB mission scenarios to be more technical ready out of all the scenarios, but all mission scenarios are in very close proximity to each other in regard to criticality and TRL and no one mission scenario stands out as being absolutely more technically ready than any of the other scenarios. What is significant and of value are the Delphi results concerning CET criticality-to-mission and the TRL values evidenced in the Tables that can be used by anyone assessing the technical feasibility of LB missions.

  8. Implementing DSpace at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Lowe, Greta

    2007-01-01

    This presentation looks at the implementation of the DSpace institutional repository system at the NASA Langley Technical Library. NASA Langley Technical Library implemented DSpace software as a replacement for the Langley Technical Report Server (LTRS). DSpace was also used to develop the Langley Technical Library Digital Repository (LTLDR). LTLDR contains archival copies of core technical reports in the aeronautics area dating back to the NACA era and other specialized collections relevant to the NASA Langley community. Extensive metadata crosswalks were created to facilitate moving data from various systems and formats to DSpace. The Dublin Core metadata screens were also customized. The OpenURL standard and Ex Libris Metalib are being used in this environment to assist our customers with either discovering full-text content or with initiating a request for the item.

  9. An Information and Technical Manual for the Computer-Assisted Teacher Training System (CATTS).

    ERIC Educational Resources Information Center

    Semmel, Melvyn I.; And Others

    The manual presents technical information on the computer assisted teacher training system (CATTS) which aims at developing a versatile and economical computer based teacher training system with the capability of providing immediate analysis and feedback of data relevant to teacher pupil transactions in a classroom setting. The physical…

  10. Examining Co-Teaching through a Socio-Technical Systems Lens

    ERIC Educational Resources Information Center

    Isherwood, Robert S.; Barger-Anderson, Richard; Erickson, Matthew

    2012-01-01

    Qualitative research was conducted in a large suburban school district implementing co-teaching as a new service delivery model for special education. Researchers examined the changes that resulted from the new service delivery model using a socio-technical systems lens. This framework views schools as open systems that contain a structural, task,…

  11. A VIRTUAL TECHNICAL SYSTEMS AUDIT OF RESEARCH QUALITY ASSURANCE AND RECORD MANAGEMENT SYSTEMS IN ORD, U.S EPA

    EPA Science Inventory

    NHEERL conducts technical systems audits (TSAs) on its research projects. The findings are reported by the QA Manager (QAM) to the Director of QA (DQA) as Exemplary Findings (things the QA Team liked); Corrective Actions (things that must be corrected immediately); and Areas for...

  12. 77 FR 65346 - Determination of Attainment for the Sacramento Nonattainment Area for the 2006 Fine Particle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... 7 EPA also concluded \\8\\ from its Technical System Audit of the CARB Primary Quality Assurance..., transmitting ``Technical System Audit of the California Environmental Protection Agency Air Resources Board... an ``anonymous access'' system, and EPA will not know your identity or contact information unless you...

  13. 77 FR 65656 - Determination of Attainment for the Nogales Nonattainment Area for the 2006 Fine Particle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ...\\ Furthermore, we concluded in our Technical System Audit Report concerning ADEQ's ambient air quality... Monitoring Network Plan: For the Year 2011''). \\7\\ Technical System Audit Report transmitted via... an ``anonymous access'' system, and EPA will not know your identity or contact information unless you...

  14. Maine Technical College System Annual Report, 1996.

    ERIC Educational Resources Information Center

    Fitzsimmons, John

    Focusing on the 1995-96 academic year, this report discusses programs and outcomes for the seven colleges in the Maine Technical College System (MTCS). Following a message from the System President, general outcomes for the MTCS are described. This section indicates that systemwide enrollment in fall 1995 was 4,475, representing a 24% increase…

  15. A Glimpse into a State Technical College System's POS Pathways

    ERIC Educational Resources Information Center

    Frazier, Stephanie D.; Swygert, N. Maria

    2012-01-01

    The South Carolina Technical College System (SCTCS) has embraced POS, providing students across the state with pathways into careers ranging from nuclear systems technology to health care to industrial technology. The SCTCS has strived, over the last 50 years, to foster a bridge between business and education. The colleges coordinate and…

  16. Theory of Technical Systems--Educational Tool for Engineering

    ERIC Educational Resources Information Center

    Eder, Wolfgang Ernst

    2016-01-01

    Hubka's theory of technical systems (TTS) is briefly outlined. It describes commonalities in all engineering devices, whatever their physical principles of action. This theory is based on a general transformation system (TrfS), which can be used to show engineering in the contexts of society, economics and historic developments. The life cycle of…

  17. 45 CFR 1182.15 - Institute responsibility for maintaining adequate technical, physical, and security safeguards to...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... record systems. These security safeguards shall apply to all systems in which identifiable personal data... data and automated systems shall be adequately trained in the security and privacy of personal data. (4... technical, physical, and security safeguards to prevent unauthorized disclosure or destruction of manual and...

  18. 45 CFR 2508.10 - Who has the responsibility for maintaining adequate technical, physical, and security safeguards...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... record systems. These security safeguards shall apply to all systems in which identifiable personal data... the security and privacy of such records. (7) The disposal and destruction of records within a system... adequate technical, physical, and security safeguards to prevent unauthorized disclosure or destruction of...

  19. Development of German-English Machine Translation System. Final Technical Report.

    ERIC Educational Resources Information Center

    Lehmann, Winfred P.; Stachowitz, Rolf A.

    This report describes work on a pilot system for a fully automatic, high-quality translation of German scientific and technical text into English and gives the results of an experiment designed to show the system's capability to produce quality mechanical translation. The areas considered were: (1) grammar formalism, mainly involving the addition…

  20. The Effect of Conceptual Diagrams on Aviation Mechanics' Technical Systems Understanding.

    ERIC Educational Resources Information Center

    Satchwell, Richard E.; Johnson, Scott D.

    A quasi-experimental study explored the effect of functional flow diagrams on technical system understanding. An individualized field training package which contained schematic diagrams that illustrated an aircraft's electrical system was complimented with functional flow diagrams. In a 4-week treatment, a control group of 10 students enrolled in…

  1. Managing change: an overview.

    PubMed

    Lorenzi, N M; Riley, R T

    2000-01-01

    As increasingly powerful informatics systems are designed, developed, and implemented, they inevitably affect larger, more heterogeneous groups of people and more organizational areas. In turn, the major challenges to system success are often more behavioral than technical. Successfully introducing such systems into complex health care organizations requires an effective blend of good technical and good organizational skills. People who have low psychological ownership in a system and who vigorously resist its implementation can bring a "technically best" system to its knees. However, effective leadership can sharply reduce the behavioral resistance to change-including to new technologies-to achieve a more rapid and productive introduction of informatics technology. This paper looks at four major areas-why information system failures occur, the core theories supporting change management, the practical applications of change management, and the change management efforts in informatics.

  2. Developing and Validating the Socio-Technical Model in Ontology Engineering

    NASA Astrophysics Data System (ADS)

    Silalahi, Mesnan; Indra Sensuse, Dana; Giri Sucahyo, Yudho; Fadhilah Akmaliah, Izzah; Rahayu, Puji; Cahyaningsih, Elin

    2018-03-01

    This paper describes results from an attempt to develop a model in ontology engineering methodology and a way to validate the model. The approach to methodology in ontology engineering is from the point view of socio-technical system theory. Qualitative research synthesis is used to build the model using meta-ethnography. In order to ensure the objectivity of the measurement, inter-rater reliability method was applied using a multi-rater Fleiss Kappa. The results show the accordance of the research output with the diamond model in the socio-technical system theory by evidence of the interdependency of the four socio-technical variables namely people, technology, structure and task.

  3. 7 CFR 652.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE General Provisions § 652.2 Definitions... public agencies certified by NRCS to provide technical services to a participant. Certification means the... technical service for conservation planning or a specific conservation practice or system; or (2) An entity...

  4. 48 CFR 719.271-5 - Cognizant technical officers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officers. 719.271-5 Section 719.271-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-5 Cognizant technical officers... cognizant technical officers can affect the opportunity of small business to participate equitably...

  5. Development of Hydrogen Education Programs for Government Officials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baxter, Shannon; Keller, Russ

    1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site

  6. Technical standing order : airborne supplemental navigation equipment using the global positioning system (GPS)

    DOT National Transportation Integrated Search

    2001-01-01

    This technical standard order (TSO) prescribes the minimum performance standard that airborne supplemental area navigation equipment using the global positioning system (GPS) must meet in order to be identified with the applicable TSO marking. Airbor...

  7. Lidar systems for measuring visibility : a technical assessment

    DOT National Transportation Integrated Search

    1974-09-01

    A study has been made of the feasibility of using a laser backscatter system (lidar) to measure slant visibility at airports. This report summarizes the present status of lidar from a technical standpoint. Based largely on the results of experimental...

  8. Solid Waste Program technical baseline description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  9. Using Functional Flow Diagrams to Enhance Technical Systems Understanding.

    ERIC Educational Resources Information Center

    Satchwell, Richard E.

    1997-01-01

    A treatment group of 20 aviation students used training manuals that presented functional flow diagrams before schematic diagrams. Comparison of data from 10 controls on a card-sort task showed that functional flow diagrams enhanced understanding of technical systems. (SK)

  10. Theoretical Aspects of the Patterns Recognition Statistical Theory Used for Developing the Diagnosis Algorithms for Complicated Technical Systems

    NASA Astrophysics Data System (ADS)

    Obozov, A. A.; Serpik, I. N.; Mihalchenko, G. S.; Fedyaeva, G. A.

    2017-01-01

    In the article, the problem of application of the pattern recognition (a relatively young area of engineering cybernetics) for analysis of complicated technical systems is examined. It is shown that the application of a statistical approach for hard distinguishable situations could be the most effective. The different recognition algorithms are based on Bayes approach, which estimates posteriori probabilities of a certain event and an assumed error. Application of the statistical approach to pattern recognition is possible for solving the problem of technical diagnosis complicated systems and particularly big powered marine diesel engines.

  11. Employment of telemedicine in emergency medicine. Clinical requirement analysis, system development and first test results.

    PubMed

    Czaplik, M; Bergrath, S; Rossaint, R; Thelen, S; Brodziak, T; Valentin, B; Hirsch, F; Beckers, S K; Brokmann, J C

    2014-01-01

    Demographic change, rising co-morbidity and an increasing number of emergencies are the main challenges that emergency medical services (EMS) in several countries worldwide are facing. In order to improve quality in EMS, highly trained personnel and well-equipped ambulances are essential. However several studies have shown a deficiency in qualified EMS physicians. Telemedicine emerges as a complementary system in EMS that may provide expertise and improve quality of medical treatment on the scene. Hence our aim is to develop and test a specific teleconsultation system. During the development process several use cases were defined and technically specified by medical experts and engineers in the areas of: system administration, start-up of EMS assistance systems, audio communication, data transfer, routine tele-EMS physician activities and research capabilities. Upon completion, technical field tests were performed under realistic conditions to test system properties such as robustness, feasibility and usability, providing end-to-end measurements. Six ambulances were equipped with telemedical facilities based on the results of the requirement analysis and 55 scenarios were tested under realistic conditions in one month. The results indicate that the developed system performed well in terms of usability and robustness. The major challenges were, as expected, mobile communication and data network availability. Third generation networks were only available in 76.4% of the cases. Although 3G (third generation), such as Universal Mobile Telecommunications System (UMTS), provides beneficial conditions for higher bandwidth, system performance for most features was also acceptable under adequate 2G (second generation) test conditions. An innovative concept for the use of telemedicine for medical consultations in EMS was developed. Organisational and technical aspects were considered and practical requirements specified. Since technical feasibility was demonstrated in these technical field tests, the next step would be to prove medical usefulness and technical robustness under real conditions in a clinical trial.

  12. Training Providers of Services to Persons with Developmental Disabilities. Level I. Technical Committee Report and Curriculum Guide. Invest in Success.

    ERIC Educational Resources Information Center

    Idaho State Dept. of Education, Boise. Div. of Vocational Education.

    Under the Idaho state system for curriculum development in vocational education, Technical Committees made up solely of industry personnel are responsible for drawing up task lists for each program. A Technical Committee Report is prepared on completion of the committees assignment. This Technical Committee Report presents a task list that…

  13. Bibliography--Unclassified Technical Reports, Special Reports, and Technical Notes: FY 1982.

    DTIC Science & Technology

    1982-11-01

    in each category are listed in chronological order under seven areas: manpower management, personnel administration , organization management, education...7633). Technical reports listed that have unlimited distribution can also be obtained from the National Technical Information Service , 5285 Port Royal...simulations of manpower systems. This research exploits the technology of computer-managed large-scale data bases. PERSONNEL ADMINISTRATION The personnel

  14. Techniques for capturing expert knowledge - An expert systems/hypertext approach

    NASA Technical Reports Server (NTRS)

    Lafferty, Larry; Taylor, Greg; Schumann, Robin; Evans, Randy; Koller, Albert M., Jr.

    1990-01-01

    The knowledge-acquisition strategy developed for the Explosive Hazards Classification (EHC) Expert System is described in which expert systems and hypertext are combined, and broad applications are proposed. The EHC expert system is based on rapid prototyping in which primary knowledge acquisition from experts is not emphasized; the explosive hazards technical bulletin, technical guidance, and minimal interviewing are used to develop the knowledge-based system. Hypertext is used to capture the technical information with respect to four issues including procedural, materials, test, and classification issues. The hypertext display allows the integration of multiple knowlege representations such as clarifications or opinions, and thereby allows the performance of a broad range of tasks on a single machine. Among other recommendations, it is suggested that the integration of hypertext and expert systems makes the resulting synergistic system highly efficient.

  15. Experiments on Socio-Technical Systems: The Problem of Control.

    PubMed

    Kroes, Peter

    2016-06-01

    My aim is to question whether the introduction of new technologies in society may be considered to be genuine experiments. I will argue that they are not, at least not in the sense in which the notion of experiment is being used in the natural and social sciences. If the introduction of a new technology in society is interpreted as an experiment, then we are dealing with a notion of experiment that differs in an important respect from the notion of experiment as used in the natural and social sciences. This difference shows itself most prominently when the functioning of the new technological system is not only dependent on technological hardware but also on social 'software', that is, on social institutions such as appropriate laws, and actions of operators of the new technological system. In those cases we are not dealing with 'simply' the introduction of a new technology, but with the introduction of a new socio-technical system. I will argue that if the introduction of a new socio-technical system is considered to be an experiment, then the relation between the experimenter and the system on which the experiment is performed differs significantly from the relation in traditional experiments in the natural and social sciences. In the latter experiments it is assumed that the experimenter is not part of the experimental system and is able to intervene in and control the experimental system from the outside. With regard to the introduction of new socio-technical systems the idea that there is an experimenter outside the socio-technical system who intervenes in and controls that system becomes problematic. From that perspective we are dealing with a different kind of experiment.

  16. International Space Station ECLSS Technical Task Agreement Summary Report

    NASA Technical Reports Server (NTRS)

    Minton-Summers, S.; Ray, C. D.

    1996-01-01

    A summary of work accomplished under Technical Task Agreement by the Marshall Space Flight Center (MSFC) documents activities regarding the Environmental Control and Life Support Systems (ECLSS) of the International Space Station (ISS) program. These MSFC activities were in-line to the designing, the development, the testing, and the flight of ECLSS equipment. MSFC's unique capabilities for performing integrated system testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs are the basis for the Technical Task Agreement activities. Tasks were completed in the Water Recovery Systems, Air Revitalization Systems, and microbiology areas. The results of each task is described in this summary report.

  17. Bridging the engineering gap: integrated systems thinking

    NASA Astrophysics Data System (ADS)

    Weintré, J. R.; Delfi, M.

    2017-09-01

    On visits to rural Indonesia it is apparent that the advances made possible by technical engineered solutions, are rarely at the same pace as the human captivation of technical development. This uneven pace has limited the application of labour-saving equipment and efficiency. It is suggested to be of primary importance to advance technical application skills among communities as part of the continuous advancement cycle in our human environment. A creative approach to inclusive technology and internal transfer of equipment knowledge in society, reduces barriers and could diminish structural or societal undesired situations. Earlier theoretical concepts provide us a lens for describing the practices of habitus, conceptualization of social capital and integrated systems thinking. The interrelationship and complexities in technical and social systems requires to be investigated. This paper aims to describe those, combined with technological applications in an empirical ethnographic approach. The study analyses the negotiations of community members with the available technology. It intends to foster a better understanding of the various cultural-economic values by exploring the systems thinking theory, with a focus on rice cultivation in Indonesia, Japan and Australia. This research suggests that cultural, economic and technical advances vary considerably and human expectations are strongly influenced by local culture.

  18. Technical Services Research Needs for the 1990s.

    ERIC Educational Resources Information Center

    Veaner, Allen B.

    1983-01-01

    Research needs in area of library technical services are identified, focusing on costs, the catalog, bibliographic data, new cataloging code, subject access in online catalogs, acquisitions, serials control system, universal technical processing terminals, data storage devices, robots and artificial intelligence, bibliographic instruction, and…

  19. TADS Needs Assessment Procedures Manual, Summer 1980.

    ERIC Educational Resources Information Center

    Black, Talbot; And Others

    The TADS (Technical Assistance Development System) Needs Assessment Manual is designed to guide the comprehensive review of Handicapped Children's Early Education Program (HCEEP) demonstration projects in identifying technical assistance needs. An introduction reviews the TADS technical assistance model which includes program planning, needs…

  20. Solar power satellite system definition study. Volume 1, phase 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A systems definition study of the solar satellite system (SPS) is presented. The technical feasibility of solar power satellites based on forecasts of technical capability in the various applicable technologies is assessed. The performance, cost, operational characteristics, reliability, and the suitability of SPS's as power generators for typical commercial electricity grids are discussed. The uncertainties inherent in the system characteristics forecasts are assessed.

  1. A Proposed Modified Technical Order System and Its Impact on Maintenance, Personnel and Training. Final Report for Period December 1974-September 1975.

    ERIC Educational Resources Information Center

    Foley, John P., Jr.

    The document presents immediate and long range plans for the systematic injection of Symbolic Integrated Maintenance Systems (SIMS) and Fully Proceduralized Job Performance Aids (FPJPA) materials into the current technical order system and the inclusion of job-oriented training matched to FPJPA into the training system of the Air Force. The text…

  2. Technical Elements of Transportation. Grade 11-12. Course #8176 (Semester). Technology Education Course Guide. Industrial Arts/Technology Education.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational Education.

    This guide is intended for use in teaching a course in the history of the development of transportation systems and the individual elements in such systems. The course is designed to break transportation systems down into their individual components so as to make it possible to study system types, media, technical elements, and environmental…

  3. Washington's Community and Technical Colleges' Student Achievement Initiative: Lessons Learned since the 2012 Revision and Considerations for New Allocation Model. Research Report 16-1

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2016

    2016-01-01

    In January 2012, a system-wide task force came together for a nearly year-long process of revising the community and technical college system's performance-based funding (PBF) system, the Student Achievement Initiative. This review was consistent with national experts' recommendations for continuous evaluation of PBF systems to ensure overall…

  4. Development and operation of NEW-KOTIS : In-house technical information database of Nippon Kokan Corp.

    NASA Astrophysics Data System (ADS)

    Yagi, Yukio; Takahashi, Kaei

    The purpose of this report is to describe how the activities for managing technical information has been and is now being conducted by the Engineering department of Nippon Kokan Corp. In addition, as a practical example of database generation promoted by the department, this book gives whole aspects of the NEW-KOTIS (background of its development, history, features, functional details, control and operation method, use in search operations, and so forth). The NEW-KOTIS (3rd-term system) is an "in-house technical information database system," which started its operation on May, 1987. This database system now contains approximately 65,000 information items (research reports, investigation reports, technical reports, etc.) generated within the company, and this information is available to anyone in any department through the network connecting all the company's structures.

  5. The 1978 National Fire-Danger Rating System: technical documentation

    Treesearch

    Larry S. Bradshaw; John E. Deeming; Robert E. Burgan; Jack D. Cohen

    1984-01-01

    The National Fire-Danger Rating System (NFDRS), implemented in 1972, has been revised and reissued as the 1978 NFDRS. This report describes the full developmental history of the NFDRS, including purpose, technical foundation, and structure. Includes an extensive bibliography and appendixes.

  6. Selected Mechanized Scientific and Technical Information Systems.

    ERIC Educational Resources Information Center

    Ackerman, Lynn, Ed.; And Others

    The publication describes the following thirteen computer-based, operational systems designed primarily for the announcement, storage, retrieval and secondary distribution of scientific and technical reports: Defense Documentation Center; Highway Research Board; National Aeronautics and Space Administration; National Library of Medicine; U.S.…

  7. The NASA scientific and technical information system: Its scope and coverage

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A general description of the subject areas covered in the NASA scientific and technical information system is presented. In addition, it establishes subject-based selection criteria for guiding decisions related to the addition of new documents to the NASA collection.

  8. Methods of monitoring the technical condition of the braking system of an autonomous vehicle during operation

    NASA Astrophysics Data System (ADS)

    Revin, A.; Dygalo, V.; Boyko, G.; Lyaschenko, M.; Dygalo, L.

    2018-02-01

    Possibilities of diagnosing of a technical condition of braking system of the autonomous vehicles with automated modules while in service are considered. The concept of sharing of onboard means and stands for diagnosing is presented.

  9. Benefit Analysis Report, United States Air Force Technical Order Management Systems (AFTOMS)

    DOT National Transportation Integrated Search

    1989-08-01

    This report prepared by the Transportation Systems Center (TSC) concludes an analysis of the Technical Order (TO) costs and benefits, which was originally undertaken as part of the US Air Force Computer-aided Acquisition and Logistics Support (CALS) ...

  10. Using Model-Based System Engineering to Provide Artifacts for NASA Project Life-Cycle and Technical Reviews Presentation

    NASA Technical Reports Server (NTRS)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.

  11. 77 FR 24178 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... and Introductions 2. Working Group Reports 3. Industry Presentation: E-beam Lithography 4. Industry Presentation: ENC Threshold for Satellite Modem 5. Industry Presentation: Semiconductor Manufacturing Equipment... DEPARTMENT OF COMMERCE Bureau of Industry and Security Information Systems Technical Advisory...

  12. Technical Leadership Development Program

    DTIC Science & Technology

    2010-12-13

    the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop

  13. Managing the Process of Protection Level Assessment of the Complex Organization and Technical Industrial Enterprises

    NASA Astrophysics Data System (ADS)

    Gorlov, A. P.; Averchenkov, V. I.; Rytov, M. Yu; Eryomenko, V. T.

    2017-01-01

    The article is concerned with mathematical simulation of protection level assessment of complex organizational and technical systems of industrial enterprises by creating automated system, which main functions are: information security (IS) audit, forming of the enterprise threats model, recommendations concerning creation of the information protection system, a set of organizational-administrative documentation.

  14. Maine Technical College System 1993/1994 Annual Report.

    ERIC Educational Resources Information Center

    Maine Technical Coll. System, Augusta.

    Focusing on data from the 1993-94 academic year, this report discusses programs and outcomes for the seven colleges in the Maine Technical College System (MTCS). Following a message from the System President, general outcomes for the MTCS are described. This section indicates that systemwide enrollment in 1993-94 was 4,305, representing a 19%…

  15. 77 FR 56775 - Approval and Promulgation of Implementation Plans; California; Determinations of Attainment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... its Technical System Audit of the CARB PQAO (conducted during Summer 2007), that the combined ambient... findings of EPA's Summer 2007 Technical System Audit of CARB's ambient air monitoring program). \\15\\ See, e... through www.regulations.gov or email. www.regulations.gov is an ``anonymous access'' system, and EPA will...

  16. 77 FR 65651 - Determination of Attainment for the Chico Nonattainment Area for the 2006 Fine Particle Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... also concluded \\9\\ from its Technical System Audit of the CARB PQAO (conducted during the summer of... ''Technical System Audit of the California Environmental Protection Agency Air Resources Board: 2007,'' with... an ``anonymous access'' system, and EPA will not know your identity or contact information unless you...

  17. Revising the IDEA Student Ratings of Instruction System 2002-2011 Data. IDEA Technical Report No. 18

    ERIC Educational Resources Information Center

    Benton, Stephen L.; Li, Dan; Brown, Ron; Guo, Meixi; Sullivan, Patricia

    2015-01-01

    This report describes the processes undertaken to revise the IDEA Student Ratings of Instruction (SRI) system. The previous revision occurred in 1999, as described in IDEA Technical Report No. 11, "Revising the IDEA System for Obtaining Student Ratings of Instructors and Courses" (Hoyt, Chen, Pallett, & Gross, 1999). The procedures…

  18. Distance Learning Success--A Perspective from Socio-Technical Systems Theory

    ERIC Educational Resources Information Center

    Wang, Jianfeng; Solan, David; Ghods, Abe

    2010-01-01

    With widespread adoption of computer-based distance education as a mission-critical component of the institution's educational program, the need for evaluation has emerged. In this research, we aim to expand on the systems approach by offering a model for evaluation based on socio-technical systems theory addressing a stated need in the literature…

  19. Wireless Instrumentation Systems for Flight Testing at NASA AFRC

    NASA Technical Reports Server (NTRS)

    Hang, Richard

    2017-01-01

    NASA Armstrong Flight Research Center is revolutionizing its traditional wired instrumentation systems with wireless technologies. This effort faces many technical challenges, such as spectrum compliance, time synchronization, power distribution and airworthiness. This presentation summarizes NASA AFRC's flight test capabilities with current conventional instrumentation methodology and highlights the technical challenges of wireless systems used for flight test research applications.

  20. 77 FR 5616 - Proposed Technical Standard Order (TSO)-C151c, Terrain Awareness and Warning System (TAWS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... (TSO)-C151c, Terrain Awareness and Warning System (TAWS) ACTION: Notice of availability and request for... second draft of Technical Standard Order (TSO)- C151c, Terrain Awareness and Warning System. Comments received from the initial June 2011 release, resulted in changes to the proposed document significant...

  1. Can You Increase Teacher Engagement with Evaluation Simply by Improving the Evaluation System?

    ERIC Educational Resources Information Center

    Moskal, Adon C. M.; Stein, Sarah J.; Golding, Clinton

    2016-01-01

    We know various factors can influence how teaching staff engage with student evaluation, such as institutional policies or staff beliefs. However, little research has investigated the influence of the technical processes of an evaluation system. In this article, we present a case study of the effects of changing the technical system for…

  2. A Computerized Information System Model for Decision Making for the Oklahoma State Department of Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Smith, Hubert Gene

    The objectives of the study presented in the dissertation were to identify present and anticipated information requirements of the various departments within the Oklahoma State Department of Vocational and Technical Education, to design a computerized information system model utilizing an integrated systems concept to meet information…

  3. HKHC Community Dashboard: design, development, and function of a Web-based performance monitoring system.

    PubMed

    Bors, Philip A; Kemner, Allison; Fulton, John; Stachecki, Jessica; Brennan, Laura K

    2015-01-01

    As part of Robert Wood Johnson Foundation's Healthy Kids, Healthy Communities (HKHC) national grant program, a technical assistance team designed the HKHC Community Dashboard, an online progress documentation and networking system. The Dashboard was central to HKHC's multimethod program evaluation and became a communication interface for grantees and technical assistance providers. The Dashboard was designed through an iterative process of identifying needs and priorities; designing the user experience, technical development, and usability testing; and applying visual design. The system was created with an open-source content management system and support for building an online community of users. The site developer trained technical assistance providers at the national program office and evaluators, who subsequently trained all 49 grantees. Evaluators provided support for Dashboard users and populated the site with the bulk of its uploaded tools and resource documents. The system tracked progress through an interactive work plan template, regular documentation by local staff and partners, and data coding and analysis by the evaluation team. Other features included the ability to broadcast information to Dashboard users via e-mail, event calendars, discussion forums, private messaging, a resource clearinghouse, a technical assistance diary, and real-time progress reports. The average number of Dashboard posts was 694 per grantee during the grant period. Technical assistance providers and grantees uploaded a total of 1304 resource documents. The Dashboard functions with the highest grantee satisfaction were its interfaces for sharing and progress documentation. A majority of Dashboard users (69%) indicated a preference for continued access to the Dashboard's uploaded resource documents. The Dashboard was a useful and innovative tool for participatory evaluation of a large national grant program. While progress documentation added some burden to local project staff, the system proved to be a useful resource-sharing technology.

  4. NASA Engineering Excellence: A Case Study on Strengthening an Engineering Organization

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert; Wessel, Vernon W.

    2006-01-01

    NASA implemented a system of technical authority following the Columbia Accident Investigation Board (CAE) report calling for independent technical authority to be exercised on the Space Shuttle Program activities via a virtual organization of personnel exercising specific technical authority responsibilities. After the current NASA Administrator reported for duty, and following the first of two planned "Shuttle Return to Flight" missions, the NASA Chief Engineer and the Administrator redirected the Independent Technical Authority to a program of Technical Excellence and Technical Authority exercised within the existing engineering organizations. This paper discusses the original implementation of technical authority and the transition to the new implementation of technical excellence, including specific measures aimed at improving safety of future Shuttle and space exploration flights.

  5. Collaboration Strategies to Reduce Technical Debt

    ERIC Educational Resources Information Center

    Miko, Jeffrey Allen

    2017-01-01

    Inadequate software development collaboration processes can allow technical debt to accumulate increasing future maintenance costs and the chance of system failures. The purpose of this qualitative case study was to explore collaboration strategies software development leaders use to reduce the amount of technical debt created by software…

  6. Geospatial Analysis | Energy Analysis | NREL

    Science.gov Websites

    products and tools. Image of a triangle divided into sections called Market, Economic, Technical, and Featured Study U.S. Renewable Energy Technical Potentials: A GIS-Based Analysis summarizes the achievable energy generation, or technical potential, of specific renewable energy technologies given system

  7. Regional Technical Exchange Centers Connect Fuel Cell Technology Suppliers,

    Science.gov Websites

    Manufacturers | News | NREL Regional Technical Exchange Centers Connect Fuel Cell Technology Suppliers, Manufacturers Regional Technical Exchange Centers Connect Fuel Cell Technology Suppliers fuel cell and hydrogen components and systems and improve U.S. manufacturing competitiveness. The

  8. Financing Technical and Vocational Education: Modalities and Experiences.

    ERIC Educational Resources Information Center

    German Foundation for International Development (DSE), Bonn (Germany).

    The two papers in this document explain various options and modalities for UNEVOC (International Project on Technical and Vocational Education) Member States' financing of their individual systems of technical and vocational education and disseminating experiences in this area. "Financing Vocational Education and Training in Developing…

  9. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  10. Second Annual Workshop on Space Operations Automation and Robotics (SOAR 1988)

    NASA Technical Reports Server (NTRS)

    Griffin, Sandy (Editor)

    1988-01-01

    Papers presented at the Second Annual Workshop on Space Operation Automation and Robotics (SOAR '88), hosted by Wright State University at Dayton, Ohio, on July 20, 21, 22, and 23, 1988, are documented herein. During the 4 days, approximately 100 technical papers were presented by experts from NASA, the USAF, universities, and technical companies. Panel discussions on Human Factors, Artificial Intelligence, Robotics, and Space Systems were held but are not documented herein. Technical topics addressed included knowledge-based systems, human factors, and robotics.

  11. Development of a Technical Practice for Roll Stabilization System Selection. Phase I

    DTIC Science & Technology

    1974-10-01

    the roll motions, velocity, acceleration and in some cases the lift on the fin. The fin is actuated by a hydraulic system which in most cases can...Technical Report 7401.06-1 I. 00VT ACCESSION NO 4. TITLI fantf S«M<(I*> ■ PHASE I REPORT ON THE (DEVELOPMENT OF A TECHNICAL PRACTICE FOR ROLL...ship rolling, for a given application, is considered. The Influence of human effectiveness and subsystem performance on this determination is

  12. O merah po dal'nejsemu ulucseniju podgotovki kvalificirovannyh rabocih v ucebnyh zavedenijah sistemy professional'no-tehniceskogo obrazovanija (Decree Concerning Measures for Further Improvement of the Training of Skilled Workers in the Establishments of the Vocational and Technical Education System) (April 2, 1969).

    ERIC Educational Resources Information Center

    Communist Party of the Soviet Union, Moscow. Central Committee.

    This document is an English-language abstract (approximately 1,500 words) of a decree issued by the Soviet Government to upgrade the system of vocational and industrial training in the USSR. It claims that vocational and technical educational establishments should gradually be transformed into vocational-technical colleges offering a 3-4 year…

  13. The Shattered Stereotype: The Academic Library in Technological Transition.

    ERIC Educational Resources Information Center

    Foster, Constance L.

    In academic libraries, neither technical services, public services, nor administration has escaped the impact of online information systems. Online catalogs, network systems, interlibrary lending, database searches, circulation control, automated technical processes, and an increasing number of non-book materials are part of a technological…

  14. 10th international conference on high-occupancy vehicle systems : compendium of technical papers

    DOT National Transportation Integrated Search

    2001-08-01

    This report provides the technical papers submitted as part of the 10th International High-Occupancy Vehicle (HOV) Systems Conference held in Dallas, Texas on August 27-30, 2000. The Conference was sponsored by the Transportation Research Board (TRB)...

  15. An approach to knowledge structuring for advanced phases of the Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Goranson, H. T.

    1986-01-01

    The Technical and Management Information System (TMIS) must employ on enlightened approach to its object structure, but basic issues in conceptual structuring remain to be resolved. Sirius outlines the necessary agenda and reports on progress toward solutions.

  16. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  17. TRANSACTIONS OF THE ALL-UNION CONFERENCE ON INFORMATION RETRIEVAL SYSTEMS AND AUTOMATED PROCESSING OF SCIENTIFIC AND TECHNICAL INFORMATION (3rd): PREFACE

    DTIC Science & Technology

    The research and development of information services within the USSR, reported at the 3rd All-Union Conference on information retrieval systems and automated processing of scientific and technical information, is discussed.

  18. Intelligent transportation systems and their implications for railroads : proceedings of a joint FRA-ITS America technical symposium

    DOT National Transportation Integrated Search

    1998-03-01

    The Federal Railroad Administration and the Intelligent Transportation Society of America (ITS America) convened a joint Technical Symposium on June 4 and 5, 1997, on the subject "Intelligent Transportation Systems and Their Implications for Railroad...

  19. Intelligent transportation system (ITS) study for the Buffalo and Niagara Falls metropolitan area, Erie and Niagara Counties, New York : final report, technical summary

    DOT National Transportation Integrated Search

    1997-06-18

    This document provides a technical summary for the seven working papers prepared for the New York State Department of Transportation (NYSDOT) Buffalo and Niagara Falls Intelligent Transportation System (ITS) Study.

  20. [Sanitary epidemiologic safety and technical regulations on railway transport].

    PubMed

    Leksin, A G

    2009-01-01

    The author necessitated that requirements on sanitary and epidemiologic safety of life support systems for engine driver cabin (microclimate maintainance system, protection from vibration and noise, illumination, workplace ergonomics, etc) should be included into technical regulations for railway vehicles, both newly constructed and modernized.

  1. 78 FR 13543 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 201, 204, 215, 225, 227, 242, 245, and 252 Defense Federal Acquisition Regulation Supplement; Technical Amendments AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Final rule. SUMMARY: DoD is...

  2. Data collection and preparation of authoritative reviews on space food and nutrition research

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The collection and classification of information for a manually operated information retrieval system on the subject of space food and nutrition research are described. The system as it currently exists is designed for retrieval of documents, either in hard copy or on microfiche, from the technical files of the MSC Food and Nutrition Section by accession number, author, and/or subject. The system could readily be extended to include retrieval by affiliation, report and contract number, and sponsoring agency should the need arise. It can also be easily converted to computerized retrieval. At present the information retrieval system contains nearly 3000 documents which consist of technical papers, contractors' reports, and reprints obtained from the food and nutrition files at MSC, Technical Library, the library at the Texas Medical Center in Houston, the BMI Technical Libraries, Dr. E. B. Truitt at MBI, and the OSU Medical Libraries. Additional work was done to compile 18 selected bibliographies on subjects of immediate interest on the MSC Food and Nutrition Section.

  3. Technical parameters for specifying imagery requirements

    NASA Technical Reports Server (NTRS)

    Coan, Paul P.; Dunnette, Sheri J.

    1994-01-01

    Providing visual information acquired from remote events to various operators, researchers, and practitioners has become progressively more important as the application of special skills in alien or hazardous situations increases. To provide an understanding of the technical parameters required to specify imagery, we have identified, defined, and discussed seven salient characteristics of images: spatial resolution, linearity, luminance resolution, spectral discrimination, temporal discrimination, edge definition, and signal-to-noise ratio. We then describe a generalizing imaging system and identified how various parts of the system affect the image data. To emphasize the different applications of imagery, we have constrasted the common television system with the significant parameters of a televisual imaging system for technical applications. Finally, we have established a method by which the required visual information can be specified by describing certain technical parameters which are directly related to the information content of the imagery. This method requires the user to complete a form listing all pertinent data requirements for the imagery.

  4. Improving of technical characteristics of launch vehicles with liquid rocket engines using active onboard de-orbiting systems

    NASA Astrophysics Data System (ADS)

    Trushlyakov, V.; Shatrov, Ya.

    2017-09-01

    In this paper, the analysis of technical requirements (TR) for the development of modern space launch vehicles (LV) with main liquid rocket engines (LRE) is fulfilled in relation to the anthropogenic impact decreasing. Factual technical characteristics on the example of a promising type of rocket ;Soyuz-2.1.v.; are analyzed. Meeting the TR in relation to anthropogenic impact decrease based on the conventional design approach and the content of the onboard system does not prove to be efficient and leads to depreciation of the initial technical characteristics obtained at the first design stage if these requirements are not included. In this concern, it is shown that the implementation of additional active onboard de-orbiting system (AODS) of worked-off stages (WS) into the onboard LV stages systems allows to meet the TR related to the LV environmental characteristics, including fire-explosion safety. In some cases, the orbital payload mass increases.

  5. Virtual expansion of the technical vision system for smart vehicles based on multi-agent cooperation model

    NASA Astrophysics Data System (ADS)

    Krapukhina, Nina; Senchenko, Roman; Kamenov, Nikolay

    2017-12-01

    Road safety and driving in dense traffic flows poses some challenges in receiving information about surrounding moving object, some of which can be in the vehicle's blind spot. This work suggests an approach to virtual monitoring of the objects in a current road scene via a system with a multitude of cooperating smart vehicles exchanging information. It also describes the intellectual agent model, and provides methods and algorithms of identifying and evaluating various characteristics of moving objects in video flow. Authors also suggest ways for integrating the information from the technical vision system into the model with further expansion of virtual monitoring for the system's objects. Implementation of this approach can help to expand the virtual field of view for a technical vision system.

  6. To the systematization of failure analysis for perturbed systems (in German)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haller, U.

    1974-01-01

    The paper investigates the reliable functioning of complex technical systems. Of main importance is the question of how the functioning of technical systems which may fail or whose design still has some faults can be determined in the very earliest planning stages. The present paper is to develop a functioning schedule and to look for possible methods of systematic failure analysis of systems with stochastic failures. (RW/AK)

  7. The Archimedes satellite system

    NASA Astrophysics Data System (ADS)

    Taylor, Stuart C.; Shurvinton, William D.

    1992-03-01

    Archimedes is a satellite system conceived by the European Space Agency (ESA) to effectively serve the European market for Mobile Radio Services (MRS). This paper describes the requirements and technical design of the Archimedes satellite system. The underlying assumptions and trade-offs behind the design are detailed and the design is compared and contrasted against alternative design solutions, both technically and economically. A path forward for the development of the system is indicated.

  8. SELECTIVE DISSEMINATION OF INFORMATION--REVIEW OF SELECTED SYSTEMS AND A DESIGN FOR ARMY TECHNICAL LIBRARIES. FINAL REPORT. ARMY TECHNICAL LIBRARY IMPROVEMENT STUDIES (ATLIS), REPORT NO. 8.

    ERIC Educational Resources Information Center

    BIVONA, WILLIAM A.

    THIS REPORT PRESENTS AN ANALYSIS OF OVER EIGHTEEN SMALL, INTERMEDIATE, AND LARGE SCALE SYSTEMS FOR THE SELECTIVE DISSEMINATION OF INFORMATION (SDI). SYSTEMS ARE COMPARED AND ANALYZED WITH RESPECT TO DESIGN CRITERIA AND THE FOLLOWING NINE SYSTEM PARAMETERS--(1) INFORMATION INPUT, (2) METHODS OF INDEXING AND ABSTRACTING, (3) USER INTEREST PROFILE…

  9. The Effect of Drycleaning Moisture on Fused Cloth Systems

    DTIC Science & Technology

    1989-03-01

    TECHNICAL REPORT NATICK/TR-89/024 et, THE EFFECT OF DRYCLEANING MOISTURE ON FUSED CLOTH SYSTEMS BY ELIZABETH J. MORELAND International...MOISTUP.E ON FUSED CLOTH SYSTEMS 12. PERSONAL AUTMOR(S) Elizabeth J. MorelanJ 13«. TYPE OF REPORT Final Technical Report 13b. TIME COVERED...This project was initiated to investigate the effect of moisture in drycleaning systems on preselected fused cloth structures. Adverse surface

  10. A Naval Task Force Performance Assessment Methodology

    DTIC Science & Technology

    1991-11-01

    methodology combines two fundamental and intuitively appealing approaches to problem solving: (1) the systems approach with its focus on a system as a whole...Naval Coastal Systems Center AD-A242 915 Panama City, Florida 32407-5000 IlhIIiRjjq TECHNICAL MEMORANDUM NCSC TM 592-91 NOVEMBER 1991 A NAVAL TASK... SYSTEMS CENTER PANAMA CITY, FLORIDA 32407-5000 CAPT DAVID P. FITCH, USN MR. TED C. BUCKLEY Commanding Officer Technical Director ADMINISTRATIVE

  11. Cooperative and Concurrent Enrollment and College Retention

    ERIC Educational Resources Information Center

    Foster, Regina

    2010-01-01

    Oklahoma has a unique system of high schools, technology centers and community colleges that work together to enable students to receive education in technical areas. Given Oklahoma's shortage of technical degree recipients, the Cooperative Alliance Program (CAP) was developed to encourage additional students to begin technical programs during…

  12. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical....205-76 Trade, business, technical, and professional activity costs. (a) FEHBP participating plans, carriers, and underwriters shall seek the advance written approval of the contracting officer for...

  13. Scaffolding Collaborative Technical Writing with Procedural Facilitation and Synchronous Discussion

    ERIC Educational Resources Information Center

    Yeh, Shiou-Wen; Lo, Jia-Jiunn; Huang, Jeng-Jia

    2011-01-01

    With the advent of computer technology, researchers and instructors are attempting to devise computer support for effective collaborative technical writing. In this study, a computer-supported environment for collaborative technical writing was developed. This system (Process-Writing Wizard) provides process-oriented scaffolds and a synchronous…

  14. 77 FR 29247 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ...). ACTION: Final rule; technical amendments. SUMMARY: This final rule makes technical amendments to Federal... advanced air bag requirements. As written now, the general warning label requirements contain an explicit... equipment requirements for restraint systems. This document makes technical amendments to several of the...

  15. 48 CFR 252.204-7012 - Safeguarding of unclassified controlled technical information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Cyber incident means actions taken through the use of computer networks that result in an actual or... printed within an information system. Technical information means technical data or computer software, as..., catalog-item identifications, data sets, studies and analyses and related information, and computer...

  16. Assessment of distributed solar power systems: Issues and impacts

    NASA Astrophysics Data System (ADS)

    Moyle, R. A.; Chernoff, H.; Schweizer, T. C.; Patton, J. B.

    1982-11-01

    The installation of distributed solar-power systems presents electric utilities with a host of questions. Some of the technical and economic impacts of these systems are discussed. Among the technical interconnect issues are isolated operation, power quality, line safety, and metering options. Economic issues include user purchase criteria, structures and installation costs, marketing and product distribution costs, and interconnect costs. An interactive computer program that allows easy calculation of allowable system prices and allowable generation-equipment prices was developed as part of this project. It is concluded that the technical problems raised by distributed solar systems are surmountable, but their resolution may be costly. The stringent purchase criteria likely to be imposed by many potential system users and the economies of large-scale systems make small systems (less than 10 to 20 kW) less attractive than larger systems. Utilities that consider life-cycle costs in making investment decisions and third-party investors who have tax and financial advantages are likely to place the highest value on solar-power systems.

  17. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  18. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  19. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  20. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  1. 48 CFR 252.235-7011 - Final scientific or technical report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT... of the report; and (c) For submission of reports in other than paper copy, contact the Defense...

  2. Funding California Schools: The Revenue Limit System. Technical Appendices

    ERIC Educational Resources Information Center

    Weston, Margaret

    2010-01-01

    This document presents the technical appendices accompanying the report, "Funding California Schools: The Revenue Limit System." Included are: (1) Revenue Limit Calculation and Decomposition; (2) Data and Methods; and (3) Base Funding Alternative Simulation Results. (Contains 5 tables and 26 footnotes.) [For the main report,…

  3. 48 CFR 2452.242-71 - Contract management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., concise summary of technical progress made and the costs incurred for each task during the reporting... technical progress made for each task during the reporting period; and (B) Identifies problems, or potential... and progress reporting as described herein. (b) The contract management system shall consist of two...

  4. Joint Common Architecture Demonstration (JCA Demo) Final Report

    DTIC Science & Technology

    2016-07-28

    approach for implementing open systems [16], formerly known as the Modular Open Systems Approach (MOSA). OSA is a business and technical strategy to... TECHNICAL REPORT RDMR-AD-16-01 JOINT COMMON ARCHITECTURE DEMONSTRATION (JCA DEMO) FINAL REPORT Scott A. Wigginton... Modular Avionics .......................................................................... 5 E. Model-Based Engineering

  5. NLC Injector Systems

    Science.gov Websites

    text only NLC Home Page NLC Technical SLAC Sources Damping Rings S & L Band Linacs Engineering ; Presentations Injector System Documentation Talks and Presentations The NLC ZDR ISG Reports Sources Lasers Photocathodes Electron Source Laser Maintenance Facility Positron Source Sources Technical Notes Sources Meeting

  6. Materials Technical Team Roadmap

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-08-01

    Roadmap identifying the efforts of the Materials Technical Team (MTT) to focus primarily on reducing the mass of structural systems such as the body and chassis in light-duty vehicles (including passenger cars and light trucks) which enables improved vehicle efficiency regardless of the vehicle size or propulsion system employed.

  7. Airborne Laser Remote Sensor for Oil Detection and Classification : Engineering Requirements and Technical Considerations Relevant to a Performance Specification

    DOT National Transportation Integrated Search

    1975-08-01

    This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...

  8. 48 CFR 1852.235-73 - Final Scientific and Technical Reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Final Scientific and Technical Reports. 1852.235-73 Section 1852.235-73 Federal Acquisition Regulations System NATIONAL..., including recommendations and conclusions based on the experience and results obtained. The final report...

  9. HIGHLIGHTS FROM TECHNICAL MANUAL ON HOOD SYSTEM CAPTURE OF PROCESS FUGITIVE PARTICULATE EMISSIONS

    EPA Science Inventory

    The paper discusses a technical manual whose emphasis is on the design and evaluation of actual hood systems used to control various fugitive particulate emission sources. Engineering analyses of the most important hood types are presented to provide a conceptual understanding of...

  10. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  11. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    ERIC Educational Resources Information Center

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  12. Faculty Performance Management System: The Faculty Development/Evaluation System at Beaufort Technical College, 1986-1987. Revised.

    ERIC Educational Resources Information Center

    Tobias, Earole; And Others

    Designed for faculty members at Beaufort Technical College (BTC) in South Carolina, this handbook describes the college's faculty evaluation process and procedures. The first sections of the handbook explain the rationale and method for the faculty evaluation process, state the purposes and objectives of the system, and offer a model which breaks…

  13. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    ERIC Educational Resources Information Center

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  14. Educational Technology Program. Quarterly Technical Summary, Period Ending 31 May 1970.

    ERIC Educational Resources Information Center

    Frick, Frederick C.

    An overview of the Lincoln Training System (LTS) and descriptions of the hardward and software of the LTS-1 and LTS-2 systems are provided. The overall program seeks to develop, test, and evaluate technical aids to vocational training systems. These are appropriate to this field because the high costs need to be reduced and because there are clear…

  15. Development of a system for monitoring technical state of the equipment of a cogeneration steam turbine unit

    NASA Astrophysics Data System (ADS)

    Aronson, K. E.; Brodov, Yu. M.; Novoselov, V. B.

    2012-12-01

    Generalized results from the work on developing elements of a comprehensive system for monitoring technical state of the equipment of cogeneration turbines are presented. The parameters of the electrohydraulic turbine control system are considered together with a number of problems concerned with assessing the state of condensers and delivery water heaters.

  16. All-Union Conference on Information Retrieval Systems and Automatic Processing of Scientific and Technical Information, 3rd, Moscow, 1967, Transactions. (Selected Articles).

    ERIC Educational Resources Information Center

    Air Force Systems Command, Wright-Patterson AFB, OH. Foreign Technology Div.

    The role and place of the machine in scientific and technical information is explored including: basic trends in the development of information retrieval systems; preparation of engineering and scientific cadres with respect to mechanization and automation of information works; the logic of descriptor retrieval systems; the 'SETKA-3' automated…

  17. Applications of Artificial Intelligence to Information Search and Retrieval: The Development and Testing of an Intelligent Technical Information System.

    ERIC Educational Resources Information Center

    Harvey, Francis A.

    This paper describes the evolution and development of an intelligent information system, i.e., a knowledge base for steel structures being undertaken as part of the Technical Information Center for Steel Structures at Lehigh University's Center of Advanced Technology for Large Structural Systems (ATLSS). The initial development of the Technical…

  18. Space station automation study: Autonomous systems and assembly, volume 2

    NASA Technical Reports Server (NTRS)

    Bradford, K. Z.

    1984-01-01

    This final report, prepared by Martin Marietta Denver Aerospace, provides the technical results of their input to the Space Station Automation Study, the purpose of which is to develop informed technical guidance in the use of autonomous systems to implement space station functions, many of which can be programmed in advance and are well suited for automated systems.

  19. Patterns of technical error among surgical malpractice claims: an analysis of strategies to prevent injury to surgical patients.

    PubMed

    Regenbogen, Scott E; Greenberg, Caprice C; Studdert, David M; Lipsitz, Stuart R; Zinner, Michael J; Gawande, Atul A

    2007-11-01

    To identify the most prevalent patterns of technical errors in surgery, and evaluate commonly recommended interventions in light of these patterns. The majority of surgical adverse events involve technical errors, but little is known about the nature and causes of these events. We examined characteristics of technical errors and common contributing factors among closed surgical malpractice claims. Surgeon reviewers analyzed 444 randomly sampled surgical malpractice claims from four liability insurers. Among 258 claims in which injuries due to error were detected, 52% (n = 133) involved technical errors. These technical errors were further analyzed with a structured review instrument designed by qualitative content analysis. Forty-nine percent of the technical errors caused permanent disability; an additional 16% resulted in death. Two-thirds (65%) of the technical errors were linked to manual error, 9% to errors in judgment, and 26% to both manual and judgment error. A minority of technical errors involved advanced procedures requiring special training ("index operations"; 16%), surgeons inexperienced with the task (14%), or poorly supervised residents (9%). The majority involved experienced surgeons (73%), and occurred in routine, rather than index, operations (84%). Patient-related complexities-including emergencies, difficult or unexpected anatomy, and previous surgery-contributed to 61% of technical errors, and technology or systems failures contributed to 21%. Most technical errors occur in routine operations with experienced surgeons, under conditions of increased patient complexity or systems failure. Commonly recommended interventions, including restricting high-complexity operations to experienced surgeons, additional training for inexperienced surgeons, and stricter supervision of trainees, are likely to address only a minority of technical errors. Surgical safety research should instead focus on improving decision-making and performance in routine operations for complex patients and circumstances.

  20. Systems for deep brain stimulation: review of technical features.

    PubMed

    Amon, A; Alesch, F

    2017-09-01

    The use of deep brain stimulation (DBS) is an important treatment option for movement disorders and other medical conditions. Today, three major manufacturers provide implantable systems for DBS. Although the underlying principle is basically the same for all available systems, the differences in the technical features vary considerably. This article outlines aspects regarding the technical features of DBS systems. The differences between voltage and current sources are addressed and their effect on stimulation is shown. To maintain clinical benefit and minimize side effects the stimulation field has to be adapted to the requirements of the patient. Shaping of the stimulation field can be achieved by the electrode design and polarity configuration. Furthermore, the electric signal consisting of stimulation rate, stimulation amplitude and pulse width affect the stimulation field. Interleaving stimulation is an additional concept, which permits improved treatment outcomes. Therefore, the electrode design, the polarity, the electric signal, and the concept of interleaving stimulation are presented. The investigated systems can be also categorized as rechargeable and non-rechargeable, which is briefly discussed. Options for interconnecting different system components from various manufacturers are presented. The present paper summarizes the technical features and their combination possibilities, which can have a major impact on the therapeutic effect.

  1. A systematic literature review on security and privacy of electronic health record systems: technical perspectives.

    PubMed

    Rezaeibagha, Fatemeh; Win, Khin Than; Susilo, Willy

    Even though many safeguards and policies for electronic health record (EHR) security have been implemented, barriers to the privacy and security protection of EHR systems persist. This article presents the results of a systematic literature review regarding frequently adopted security and privacy technical features of EHR systems. Our inclusion criteria were full articles that dealt with the security and privacy of technical implementations of EHR systems published in English in peer-reviewed journals and conference proceedings between 1998 and 2013; 55 selected studies were reviewed in detail. We analysed the review results using two International Organization for Standardization (ISO) standards (29100 and 27002) in order to consolidate the study findings. Using this process, we identified 13 features that are essential to security and privacy in EHRs. These included system and application access control, compliance with security requirements, interoperability, integration and sharing, consent and choice mechanism, policies and regulation, applicability and scalability and cryptography techniques. This review highlights the importance of technical features, including mandated access control policies and consent mechanisms, to provide patients' consent, scalability through proper architecture and frameworks, and interoperability of health information systems, to EHR security and privacy requirements.

  2. Assessing neurosurgical non-technical skills: an exploratory study of a new behavioural marker system.

    PubMed

    Michinov, Estelle; Jamet, Eric; Dodeler, Virginie; Haegelen, Claire; Jannin, Pierre

    2014-10-01

    The management of non-technical skills is a major factor affecting teamwork quality and patient safety. This article presents a behavioural marker system for assessing neurosurgical non-technical skills (BMS-NNTS). We tested the BMS during deep brain stimulation surgery. We developed the BMS in three stages. First, we drew up a provisional assessment tool based on the literature and observation tools developed for other surgical specialties. We then analysed videos made in an operating room (OR) during deep brain stimulation operations in order to ensure there were no significant omissions from the skills list. Finally, we used five videos of operations to identify the behavioural markers of non-technical skills in verbal communications. Analyses of more than six hours of observations revealed 3515 behaviours from which we determined the neurosurgeon's non-technical skills behaviour pattern. The neurosurgeon frequently engaged in explicit coordination, situation awareness and leadership behaviours. In addition, the neurosurgeon's behaviours differed according to the stage of the operation and the OR staff members with whom she was communicating. Our behavioural marker system provides a structured approach to assessing non-technical skills in the field of neurosurgery. It can also be transferred to other surgical specialties and used in surgeon training curricula. © 2014 John Wiley & Sons, Ltd.

  3. OEXP exploration studies technical report. Volume 3: Special reports, studies, and indepth systems assessments

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.; Bland, Dan

    1988-01-01

    The Office of Exploration (OEXP) at NASA has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of manned exploration of the Solar System. The Mission analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process used to conduct exploration studies and discusses the mission developed in a case study approach. The four case studies developed in FY88 include: (1) a manned expedition to PHOBOS; (2) a manned expedition to MARS; (3) a lunar surface observatory; and a lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.

  4. Office of Exploration: Exploration studies technical report. Volume 2: Studies approach and results

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.; Bland, Dan

    1988-01-01

    The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: (1) human expedition to Phobos; (2) human expeditions to Mars; (3) lunar observatory; and (4) lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume 2 describes the case study process, the technical results of each of the case studies, and opportunities for additional study. Included in the discussion of each case study is a description of the mission key features and profile. Mission definition and manifesting are detailed, followed by a description of the mission architecture and infrastructure. Systems concepts for the required orbital nodes, transportation systems, and planetary surface systems are discussed. Prerequisite implementation plans resulting from the synthesized case studies are described and in-depth assessments are presented.

  5. Technical Adequacy of the easyCBM Primary-Level Reading Measures (Grades K-1), 2009-2010 Version. Technical Report #1003

    ERIC Educational Resources Information Center

    Lai, Cheng-Fei; Nese, Joseph F. T.; Jamgochian, Elisa M.; Alonzo, Julie; Tindal, Gerald

    2010-01-01

    In this technical report, we provide the results of a series of studies on the technical adequacy of the early reading measures available on the easyCBM[R] assessment system. The results from the two-level hierarchical linear growth model analyses suggest that the reliability of the slope estimates for the easyCBM[R] reading measures are strong,…

  6. Gun Control for VBE-E: User Guide and Technical Description

    DTIC Science & Technology

    2006-11-01

    Defence R& D Canada – Atlantic DEFENCE DÉFENSE & Gun Control for VBE-E User Guide and Technical Description Tania E. Wentzell Technical Memorandum...Defence R& D Canada – Atlantic Technical Memorandum DRDC Atlantic TM 2006-245 November 2006 DRDC Atlantic TM 2006-245...component of the distributed experimentation environment used by the Virtual Combat System (VCS) Group at Defence R& D Canada – Atlantic (DRDC Atlantic

  7. Core ITAC for Career-Focused Education. Integrated Technical & Academic Competencies.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Vocational Instructional Materials Lab.

    This document introduces the underlying principles and components of Ohio's Integrated Technical and Academic Competencies (ITAC) system of career-focused education, which combines high-level academics and technical skills with a real-life context for learning that maximizes students' present and future academic and career success. The document…

  8. 77 FR 41132 - Air Quality Implementation Plans; Alabama; Attainment Plan for the Alabama Portion of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... modeling demonstration should include supporting technical analyses and descriptions of all relevant....5 and NO X . The attainment demonstration includes: Technical analyses that locate, identify, and... modeling analysis is a complex technical evaluation that began with selection of the modeling system. The...

  9. A Perkins Challenge: Assessing Technical Skills in CTE

    ERIC Educational Resources Information Center

    Stone, James R., III

    2009-01-01

    Federal law requires state to develop performance measures and data-collection systems for secondary and postsecondary technical-skill attainment. This poses many challenges, such as defining a technical skills, measurement and when to assess students. In this article, the author outlines various assessment models and looks at the challenges…

  10. Vocational-Technical Education: A Plan for Monroe County, Florida.

    ERIC Educational Resources Information Center

    Mills, Hugh L., Sr., Ed.; Pilcher, Palmer, C., Ed.

    Suggested vocational-technical education programs for the Monroe County Florida school system are presented along with recommendations to implement the principle of coordinated career education in the public schools. Expansion of vocational-technical programs is emphasized to expose all students from kindergarten through Grade 12 to career…

  11. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical... Organizations 2131.205-43 Trade, business, technical and professional activity costs. (a) FEGLI Program contractors shall seek the advance written approval of the contracting officer for allowability of all or part...

  12. A Taxonomy of Technical Assistance Skills.

    ERIC Educational Resources Information Center

    Ogden, Evelyn; Musumeci, Marilyn

    To operationalize the Technical Assistance Brokerage System, the first major task called for the development of a taxonomy of training and technical assistance services specifying requisite skills and skill clusters by the dimensions of client type, stages of dissemination, and levels of experience. From a literature search approximately 400…

  13. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  14. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  15. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  16. 77 FR 47495 - Final Priority; Technical Assistance on State Data Collection, Analysis, and Reporting-National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... intervention and preschool service providers with data on their qualifications, certification, and preparation... Priority; Technical Assistance on State Data Collection, Analysis, and Reporting--National IDEA Technical Assistance Center on Early Childhood Longitudinal Data Systems; Rule #0;#0;Federal Register / Vol. 77, No...

  17. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  18. 48 CFR 12.211 - Technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Technical data. 12.211... data. Except as provided by agency-specific statutes, the Government shall acquire only the technical data and the rights in that data customarily provided to the public with a commercial item or process...

  19. Exploration studies technical report, FY1988 status. Volume 1: Technical summary

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The Office of Exploration (OEXP) at NASA Headquarters has been tasked with defining and recommending alternatives for an early 1990's nationaL decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Lyndon B. Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process that has been developed in a case study approach. The four case studies developed in FY88 include: (1) Human Expedition to Phobos; (2) Human Expedition to Mars; (3) Lunar Observatory; and (4) Lunar Outpost to Early Mars Evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.

  20. MODIS Validation, Data Merger and Other Activities Accomplished by the SIMBIOS Project: 2002-2003

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.

    2003-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, satellite data processing, and data product validation. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report focuses on the SIMBIOS Project s efforts in support of the Moderate-Resolution Imaging Spectroradiometer (MODIS) on the Earth Observing System (EOS) Terra platform (similar evaluations of MODIS/Aqua are underway). This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  1. ACE: A distributed system to manage large data archives

    NASA Technical Reports Server (NTRS)

    Daily, Mike I.; Allen, Frank W.

    1993-01-01

    Competitive pressures in the oil and gas industry are requiring a much tighter integration of technical data into E and P business processes. The development of new systems to accommodate this business need must comprehend the significant numbers of large, complex data objects which the industry generates. The life cycle of the data objects is a four phase progression from data acquisition, to data processing, through data interpretation, and ending finally with data archival. In order to implement a cost effect system which provides an efficient conversion from data to information and allows effective use of this information, an organization must consider the technical data management requirements in all four phases. A set of technical issues which may differ in each phase must be addressed to insure an overall successful development strategy. The technical issues include standardized data formats and media for data acquisition, data management during processing, plus networks, applications software, and GUI's for interpretation of the processed data. Mass storage hardware and software is required to provide cost effective storage and retrieval during the latter three stages as well as long term archival. Mobil Oil Corporation's Exploration and Producing Technical Center (MEPTEC) has addressed the technical and cost issues of designing, building, and implementing an Advanced Computing Environment (ACE) to support the petroleum E and P function, which is critical to the corporation's continued success. Mobile views ACE as a cost effective solution which can give Mobile a competitive edge as well as a viable technical solution.

  2. Managerial Cost Accounting for a Technical Information Center.

    ERIC Educational Resources Information Center

    Helmkamp, John G.

    A two-fold solution to the cost information deficiency problem is proposed. A formal managerial cost accounting system is designed expressly for the two information services of retrospective search and selective dissemination. The system was employed during a trial period to test its effectiveness in a technical information center. Once…

  3. 48 CFR 801.602-83 - Documents to submit for legal or technical review-contract modifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Documents to submit for legal or technical review-contract modifications. 801.602-83 Section 801.602-83 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION...

  4. Sociotechnical Walkthrough: A Means for Knowledge Integration

    ERIC Educational Resources Information Center

    Herrmann, Thomas; Loser, Kai-Uwe; Jahnke, Isa

    2007-01-01

    Purpose: The purpose of this research is to show that for the successful development of socio-technical systems it is essential that various stakeholders are able to integrate their different knowledge and perspectives. A method that supports knowledge integration in the course of introduction and development of socio-technical systems is the…

  5. A Study of the Relationship between Personality Types and the Acceptance of Technical Knowledge Management Systems (TKMS)

    ERIC Educational Resources Information Center

    Sullivan, Maureen S.

    2012-01-01

    Technical knowledge management systems (TKMSs) are not achieving the usage (acceptance) and the benefits that have been forecasted and are therefore, not enhancing competitive advantage and profits in organizations (Comb, 2004, "Assessing customer relationship management strategies for creating competitive advantage in electronic…

  6. An Assessment of Music Programs in the Alabama Community College System

    ERIC Educational Resources Information Center

    Powe, Holly Vanessa

    2010-01-01

    The Alabama Community College System (ACCS) consists of 21 comprehensive community colleges, four technical colleges, and Athens State University, the state's only upper level, two- year college. The majority of those 21 colleges incorporate the five objectives of providing transfer, vocational/technical and remedial education, as well as…

  7. 48 CFR 801.602-79 - Processing solicitations and contract documents for legal or technical review-Veterans Benefits...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Processing solicitations and contract documents for legal or technical review-Veterans Benefits Administration. 801.602-79 Section 801.602-79 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL...

  8. Ohio Agricultural Business and Production Systems. Technical Competency Profile (TCP).

    ERIC Educational Resources Information Center

    Ray, Gayl M.; Kershaw, Isaac; Mokma, Arnie

    This document describes the essential competencies from secondary through post-secondary associate degree programs for a career in agricultural business and production systems. Following an introduction, the Ohio College Tech Prep standards and program, and relevant definitions are described. Next are the technical competency profiles for these…

  9. 48 CFR 801.602-83 - Documents to submit for legal or technical review-contract modifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Documents to submit for legal or technical review-contract modifications. 801.602-83 Section 801.602-83 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION...

  10. 48 CFR 801.602-83 - Documents to submit for legal or technical review-contract modifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Documents to submit for legal or technical review-contract modifications. 801.602-83 Section 801.602-83 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION...

  11. 48 CFR 801.602-83 - Documents to submit for legal or technical review-contract modifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Documents to submit for legal or technical review-contract modifications. 801.602-83 Section 801.602-83 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION...

  12. 48 CFR 801.602-83 - Documents to submit for legal or technical review-contract modifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Documents to submit for legal or technical review-contract modifications. 801.602-83 Section 801.602-83 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION...

  13. 48 CFR 1403.101-70 - Technical evaluators and advisors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical evaluators and advisors. 1403.101-70 Section 1403.101-70 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... resolved with the servicing Ethics Counselor. (c) During the evaluation process, each evaluator and advisor...

  14. 76 FR 29274 - Interstate Electronics Corp., a Subsidiary of L-3 Communications Including On-Site Leased Workers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Resources, Systems Pros, Total Tech Services, Triple Crown Consulting, and Ingenium Technology, Inc... Resources, PDS Technical Service, Superior Technical Resources, Systems Pros, Total Tech Services, and... subject firm. The company reports that workers leased from Ingenium Technology, Inc. were employed on-site...

  15. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  16. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...

  17. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  18. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  19. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  20. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

Top