Sample records for system upgrade project

  1. Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant. Office of Industrial Technologies (OIT) BestPractices Project Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2002-01-01

    This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.

  2. Kongiganak Wind Turbine Replacement and System Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boonstra, Patrick

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  3. Recent Developments at the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2011-01-01

    Several upgrade projects have been completed or are just getting started at the NASA Langley Research Center National Transonic Facility. These projects include a new high capacity semi-span balance, model dynamics damping system, semi-span model check load stand, data acquisition system upgrade, facility automation system upgrade and a facility reliability assessment. This presentation will give a brief synopsis of each of these efforts.

  4. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Greene, Judy

    Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…

  5. Students Upgrading through Computer and Career Education System Services (Project SUCCESS). Final Evaluation Report 1992-93. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…

  6. Advanced Ground Systems Maintenance Cryogenics Test Lab Control System Upgrade Project

    NASA Technical Reports Server (NTRS)

    Harp, Janice Leshay

    2014-01-01

    This project will outfit the Simulated Propellant Loading System (SPLS) at KSC's Cryogenics Test Laboratory with a new programmable logic control system. The control system upgrade enables the Advanced Ground Systems Maintenace Element Integration Team and other users of the SPLS to conduct testing in a controls environment similar to that used at the launch pad.

  7. Upgrade of Compressed Air Control System Reduces Energy Costs at Michelin Tire Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2002-01-01

    This case study highlights the upgraded compressed air system at a Michelin tire manufacturing plant in Spartanburg, South Carolina. The controls upgrade project enabled multiple compressor operation without blow-off, and significantly reduced energy costs.

  8. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abdullah, Zia; Chadwell, Brad; Taha, Rachid

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  9. The Students Upgrading through Computer and Career Education Systems Services (Project SUCCESS). 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…

  10. Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meador, Richard J.; Hatley, Darrel D.

    2004-03-18

    Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less

  11. New developments in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft E.; Fitzgerald, Michael P.; Johnson, James; Larkin, James E.; Lewis, Hilton A.; Martin, Christopher; Matthews, Keith Y.; Prochaska, J. X.; Wizinowich, Peter

    2014-07-01

    The W. M. Keck Observatory continues to develop new capabilities in support of our science driven strategic plan which emphasizes leadership in key areas of observational astronomy. This leadership is a key component of the scientific productivity of our observing community and depends on our ability to develop new instrumentation, upgrades to existing instrumentation, and upgrades to supporting infrastructure at the observatory. In this paper we describe the as measured performance of projects completed in 2014 and the expected performance of projects currently in the development or construction phases. Projects reaching completion in 2014 include a near-IR tip/tilt sensor for the Keck I adaptive optics system, a new center launch system for the Keck II laser guide star facility, and NIRES, a near-IR Echelle spectrograph for the Keck II telescope. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager, a deployable tertiary mirror for the Keck I telescope, upgrades to the spectrograph detector and the imager of the OSIRIS instrument, and an upgrade to the telescope control systems on both Keck telescopes.

  12. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Upgrade Project EIS AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... involvement. SUMMARY: BPA intends to prepare an EIS in accordance with the National Environmental Policy Act... consist of a combination of reinforcements of five existing BPA substations, placement of new conductor on...

  13. ARC-2001-ACD01-0018

    NASA Image and Video Library

    2001-02-16

    New Center Network Deployment ribbon Cutting: from left to right: Maryland Edwards, Code JT upgrade project deputy task manager; Ed Murphy, foundry networks systems engineer; Bohdan Cmaylo, Code JT upgrade project task manager, Scott Santiago, Division Chief, Code JT; Greg Miller, Raytheon Network engineer and Frank Daras, Raytheon network engineering manager.

  14. Performance upgrades in the EUV engineering test stand

    NASA Astrophysics Data System (ADS)

    Tichenor, Daniel A.; Replogle, William C.; Lee, Sang Hun; Ballard, William P.; Leung, Alvin H.; Kubiak, Glenn D.; Klebanoff, Leonard E.; Graham, Samual, Jr.; Goldsmith, John E. M.; Jefferson, Karen L.; Wronosky, John B.; Smith, Tony G.; Johnson, Terry A.; Shields, Harry; Hale, Layton C.; Chapman, Henry N.; Taylor, John S.; Sweeney, Donald W.; Folta, James A.; Sommargren, Gary E.; Goldberg, Kenneth A.; Naulleau, Patrick P.; Attwood, David T., Jr.; Gullikson, Eric M.

    2002-07-01

    The EUV Engineering Test Stand (ETS) has demonstrated the printing of 100-nm-resolution scanned images. This milestone was first achieved while the ETS operated in an initial configuration using a low power laser and a developmental projection system, PO Box 1. The drive laser has ben upgraded to a single chain of the three-chain Nd:YAG laser developed by TRW. The result in exposure time is approximately 4 seconds for static exposures. One hundred nanometer dense features have been printed in step-and-scan operation with the same image quality obtained in static printing. These experiments are the first steps toward achieving operation using all three laser chains for a total drive laser power of 1500 watts. In a second major upgrade the developmental wafer stage platen, used to demonstrate initial full-field imaging, has been replaced with the final low-expansion platen made of Zerodur. Additional improvements in the hardware and control software have demonstrated combined x and jitter from 2 to 4 nm RMS Over most of the wafer stage travel range, while scanning at the design scan speed of 10 mm/s at the wafer. This value, less than half of the originally specified jitter, provides sufficient stability to support printing of 70 nm features as planned, when the upgraded projection system is installed. The third major upgrade will replace PO Box 1 with an improved projection system, PO Box 2, having lower figure error and lower flare. In addition to these upgrades, dose sensors at the reticle and wafer planes and an EUV- sensitive aerial image monitor have been integrated into the ETS. This paper reports on ETS system upgrades and the impact on system performance.

  15. Integrated science building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conklin, Shane

    2013-09-30

    Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment.

  16. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of themore » Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.« less

  17. Upgrades at the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2012-01-01

    Several projects have been completed or are nearing completion at the NASA Langley Research Center (LaRC) National Transonic Facility (NTF). The addition of a Model Flow-Control/Propulsion Simulation test capability to the NTF provides a unique, transonic, high-Reynolds number test capability that is well suited for research in propulsion airframe integration studies, circulation control high-lift concepts, powered lift, and cruise separation flow control. A 1992 vintage Facility Automation System (FAS) that performs the control functions for tunnel pressure, temperature, Mach number, model position, safety interlock and supervisory controls was replaced using current, commercially available components. This FAS upgrade also involved a design study for the replacement of the facility Mach measurement system and the development of a software-based simulation model of NTF processes and control systems. The FAS upgrades were validated by a post upgrade verification wind tunnel test. The data acquisition system (DAS) upgrade project involves the design, purchase, build, integration, installation and verification of a new DAS by replacing several early 1990's vintage computer systems with state of the art hardware/software. This paper provides an update on the progress made in these efforts. See reference 1.

  18. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    NASA Technical Reports Server (NTRS)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodman, Dan

    The goal of this project is to upgrade existing building facilities owned by Nunamiut Corporation in Anaktuvuk Pass, AK. The upgrades mentioned will include lighting, heating system, insulation and smart control units designed to increase the energy efficiency of Village Corporation owned buildings.

  20. Joint Department of Defense, Advance Planning Briefing to Industry, Held at Kissimmee, Florida, on 30 April - 2 May 1996

    DTIC Science & Technology

    1996-05-01

    Systems 17 Motion Bases Upgraded Aero Misc > Contact Info • AMC, Lt Col Letica , Phone (618) 256-5696 L8 Upgrade Flow Plan Advance Planning Briefing...Projected Schedule: FY 05 > Requirement Document: AMMP >• Projected Program Size: ? < $40M > Funding Status/Stability: > POCs: • AMC, Lt Col Letica

  1. Project Design Concept for Monitoring and Control System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCGREW, D.L.

    2000-10-02

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations.

  2. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sajadi, Amirhossein; Loparo, Kenneth A.; D'Aquila, Robert

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods tomore » quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.« less

  3. MWPC prototyping and performance test for the STAR inner TPC upgrade

    NASA Astrophysics Data System (ADS)

    Shen, Fuwang; Wang, Shuai; Kong, Fangang; Bai, Shiwei; Li, Changyu; Videbæk, Flemming; Xu, Zhangbu; Zhu, Chengguang; Xu, Qinghua; Yang, Chi

    2018-07-01

    A new prototype of STAR inner Time Projection Chamber (iTPC) MWPC sector has been fabricated and tested in an X-ray test system. The wire chamber built at Shandong University has a wire tension precision better than 6% and wire pitch precision better than 10 μm. The gas gain uniformity and energy resolution are measured to be better than 1% (RMS) and 20% (FWHM), respectively, using an 55Fe X-ray source. The iTPC upgrade project is to replace all 24 STAR TPC inner sectors as a crucial detector upgrade for the RHIC beam energy scan phase II program. The test results show that the constructed iTPC prototype meets all project requirements.

  4. A project of upgrading the operations control system of the Hungarian electric power system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oroszki, L.; Kovacs, G.

    About 20 years ago an on-line EMS/SCADA system replaced the previously used off-line control system in the Hungarian power system. The system that has met the technological requirements of that time now became obsolete. A project started in 1995 by the Hungarian Power Companies, Ltd. (MVM Rt.), the regional utility companies and the power plant companies, with funding through a World Bank loan to cover international procurement, aims to upgrade that system into a complex, intelligent and state-of-the-art process control system. The new hierarchical system will rely on a distributed computer network structure, universally accepted hardware/software interface standards and communicationmore » protocols and use hardware platform independent software. The automatic generation control, performed from the National Dispatch Centre, will have expanded functionality, the most important single item of this will be the inclusion of automatic voltage/var control. The upgrading project includes the replacement of the substation and power plant remote terminal units and the installation of a telecommunication network to provide this telecontrol system with the necessary communications links. The supply contracts for both the master station and the remote terminal unit parts were awarded to the winners of open international bidding processes. In the project implementation MVM has the overall responsibility and works with assistance from international and Hungarian engineering firms.« less

  5. Infrastructure for Training and Partnershipes: California Water and Coastal Ocean Resources

    NASA Technical Reports Server (NTRS)

    Siegel, David A.; Dozier, Jeffrey; Gautier, Catherine; Davis, Frank; Dickey, Tommy; Dunne, Thomas; Frew, James; Keller, Arturo; MacIntyre, Sally; Melack, John

    2000-01-01

    The purpose of this project was to advance the existing ICESS/Bren School computing infrastructure to allow scientists, students, and research trainees the opportunity to interact with environmental data and simulations in near-real time. Improvements made with the funding from this project have helped to strengthen the research efforts within both units, fostered graduate research training, and helped fortify partnerships with government and industry. With this funding, we were able to expand our computational environment in which computer resources, software, and data sets are shared by ICESS/Bren School faculty researchers in all areas of Earth system science. All of the graduate and undergraduate students associated with the Donald Bren School of Environmental Science and Management and the Institute for Computational Earth System Science have benefited from the infrastructure upgrades accomplished by this project. Additionally, the upgrades fostered a significant number of research projects (attached is a list of the projects that benefited from the upgrades). As originally proposed, funding for this project provided the following infrastructure upgrades: 1) a modem file management system capable of interoperating UNIX and NT file systems that can scale to 6.7 TB, 2) a Qualstar 40-slot tape library with two AIT tape drives and Legato Networker backup/archive software, 3) previously unavailable import/export capability for data sets on Zip, Jaz, DAT, 8mm, CD, and DLT media in addition to a 622Mb/s Internet 2 connection, 4) network switches capable of 100 Mbps to 128 desktop workstations, 5) Portable Batch System (PBS) computational task scheduler, and vi) two Compaq/Digital Alpha XP1000 compute servers each with 1.5 GB of RAM along with an SGI Origin 2000 (purchased partially using funds from this project along with funding from various other sources) to be used for very large computations, as required for simulation of mesoscale meteorology or climate.

  6. Panoramic projection avionics displays

    NASA Astrophysics Data System (ADS)

    Kalmanash, Michael H.

    2003-09-01

    Avionics projection displays are entering production in advanced tactical aircraft. Early adopters of this technology in the avionics community used projection displays to replace or upgrade earlier units incorporating direct-view CRT or AMLCD devices. Typical motivation for these upgrades were the alleviation of performance, cost and display device availability concerns. In these systems, the upgraded (projection) displays were one-for-one form / fit replacements for the earlier units. As projection technology has matured, this situation has begun to evolve. The Lockheed-Martin F-35 is the first program in which the cockpit has been specifically designed to take advantage of one of the more unique capabilities of rear projection display technology, namely the ability to replace multiple small screens with a single large conformal viewing surface in the form of a panoramic display. Other programs are expected to follow, since the panoramic formats enable increased mission effectiveness, reduced cost and greater information transfer to the pilot. Some of the advantages and technical challenges associated with panoramic projection displays for avionics applications are described below.

  7. Requirements Verification Report AN Farm to 200 E Waste Transfer System for Project W-314 Tank Farm Restoration & Safe Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCGREW, D.L.

    2001-10-31

    This Requirements Verification Report provides the traceability of how Project W-314 fulfilled the Project Development Specification requirements for the AN Farm to 200E Waste Transfer System Upgrade package.

  8. MWPC prototyping and performance test for the STAR inner TPC upgrade

    DOE PAGES

    Shen, Fuwang; Wang, Shuai; Kong, Fangang; ...

    2018-04-16

    A new prototype of STAR inner Time Projection Chamber (iTPC) MWPC sector has been fabricated and tested in an X-ray test system. The wire chamber built at Shandong University has a wire tension precision better than 6% and wire pitch precision better than 10 μm. The gas gain uniformity and energy resolution are measured to be better than 1% (RMS) and 20% (FWHM), respectively, using an 55Fe X-ray source. The iTPC upgrade project is to replace all 24 STAR TPC inner sectors as a crucial detector upgrade for the RHIC beam energy scan phase II program. Furthermore, the test resultsmore » show that the constructed iTPC prototype meets all project requirements.« less

  9. MWPC prototyping and performance test for the STAR inner TPC upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shen, Fuwang; Wang, Shuai; Kong, Fangang

    A new prototype of STAR inner Time Projection Chamber (iTPC) MWPC sector has been fabricated and tested in an X-ray test system. The wire chamber built at Shandong University has a wire tension precision better than 6% and wire pitch precision better than 10 μm. The gas gain uniformity and energy resolution are measured to be better than 1% (RMS) and 20% (FWHM), respectively, using an 55Fe X-ray source. The iTPC upgrade project is to replace all 24 STAR TPC inner sectors as a crucial detector upgrade for the RHIC beam energy scan phase II program. Furthermore, the test resultsmore » show that the constructed iTPC prototype meets all project requirements.« less

  10. The Network Operations Control Center upgrade task: Lessons learned

    NASA Technical Reports Server (NTRS)

    Sherif, J. S.; Tran, T.-L.; Lee, S.

    1994-01-01

    This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.

  11. Instrumentation and control upgrade plan for Browns Ferry nuclear plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Belew, M.R.; Langley, D.T.; Torok, R.C.

    1992-01-01

    A comprehensive upgrade of the instrumentation and control (I C) systems at a power plant represents a formidable project for any utility. For a nuclear plant, the extra safety and reliability requirements along with regulatory constraints add further complications and cost. The need for the upgrade must, therefore, be very compelling, and the process must be well planned from the start. This paper describes the steps taken to initiate the I C upgrade process for Tennessee Valley Authority's (TVA's) Browns Ferry 2 nuclear plant. It explains the impetus for the upgrade, the expected benefits, and the process by which systemmore » upgrades will be selected and implemented.« less

  12. Upgrading of Sergiev Posad department of Moscow NPO Radon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Debieve, Pierre; Delecaut, Gregory; Vanleeuw, Daniel

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territorymore » of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)« less

  13. Lac Courte Oreilles Hydro Dam Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weaver, Jason; Meyers, Amy

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  14. Energy Efficiency Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roby Williams

    2012-03-29

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 wasmore » replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.« less

  15. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stillwell, B.; Billett, B.; Brajuskovic, B.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  16. The nuMOIRCS project: detector upgrade overview and early commissioning results

    NASA Astrophysics Data System (ADS)

    Walawender, Josh; Wung, Matthew; Fabricius, Maximilian; Tanaka, Ichi; Arimoto, Nobuo; Cook, David; Elms, Brian; Hashiba, Yasuhito; Hu, Yen-Sang; Iwata, Ikuru; Nishimura, Tetsuo; Omata, Koji; Takato, Naruhisa; Wang, Shiang-Yu; Weber, Mark

    2016-08-01

    In 2014 and 2015 the Multi-Object InfraRed Camera and Spectrograph (MOIRCS) instrument at the Subaru Telescope on Maunakea is underwent a significant modernization and upgrade project. We upgraded the two Hawaii2 detectors to Hawaii2-RG models, modernized the cryogenic temperature control system, and rewrote much of the instrument control software. The detector upgrade replaced the Hawaii2 detectors which use the Tohoku University Focal Plane Array Controller (TUFPAC) electronics with Hawaii2-RG detectors using SIDECAR ASIC (a fully integrated FPA controller system-on-a-chip) and a SAM interface card. We achieved an improvement in read noise by a factor of about 2 with this detector and electronics upgrade. The cryogenic temperature control upgrade focused on modernizing the components and making the procedures for warm up and cool down of the instrument safer. We have moved PID control loops out of the instrument control software and into Lakeshore model 336 cryogenic temperature controllers and have added interlocks on the warming systems to prevent overheating of the instrument. Much of the instrument control software has also been re-written. This was necessitated by the different interface to the detector electronics (ASIC and SAM vs. TUFPAC) and by the desire to modernize the interface to the telescope control software which has been updated to Subaru's "Gen2" system since the time of MOIRCS construction and first light. The new software is also designed to increase reliability of operation of the instrument, decrease overheads, and be easier for night time operators and support astronomers to use.

  17. A transverse bunch by bunch feedback system for Pohang Light Source upgrade

    NASA Astrophysics Data System (ADS)

    Lee, E.-H.; Kim, D.-T.; Huang, J.-Y.; Shin, S.; Nakamura, T.; Kobayashi, K.

    2014-12-01

    The Pohang Light Source upgrade (PLS-II) project has successfully upgraded the Pohang Light Source (PLS). The main goals of the PLS-II project are to increase the beam energy to 3 GeV, increase the number of insertion devices by a factor of two (20 IDs), increase the beam current to 400 mA, and at the same time reduce the beam emittance to below 10 nm by using the existing PLS tunnel and injection system. Among 20 insertion devices, 10 narrow gap in-vacuum undulators are in operation now and two more in-vacuum undulators are to be installed later. Since these narrow gap in-vacuum undulators are most likely to produce coupled bunch instability by the resistive wall impedance and limit the stored beam current, a bunch by bunch feedback system is implemented to suppress coupled bunch instability in the PLS-II. This paper describes the scheme and performance of the PLS-II bunch by bunch feedback system.

  18. Assembly and commissioning of a new SRF cryomodule for the ATLAS intensity upgrade

    NASA Astrophysics Data System (ADS)

    Conway, Z. A.; Barcikowski, A.; Cherry, G. L.; Fischer, R. L.; Fuerst, J. D.; Jansma, W. G.; Gerbick, S. M.; Kedzie, M. J.; Kelly, M. P.; Kim, S. H.; MacDonald, S. W. T.; Murphy, R. C.; Ostroumov, P. N.; Reid, T. C.; Shepard, K. W.

    2014-01-01

    The Argonne National Laboratory Physics Division is in the final stages of a major upgrade to the Argonne Tandem Linear Accelerator System national user facility, referred to as the intensity upgrade. The intensity upgrade project will substantially increase beam currents for experimenters working with the existing ATLAS stable and in-flight rare isotope beams and for the neutron-rich beams from the Californium Rare Isotope Breeder Upgrade. This project includes the replacement of three existing cryomodules, containing 18 superconducting accelerator cavities and 9 superconducting solenoids, with a single cryomodule with seven SC 72.75 MHz accelerator cavities optimized for ion velocities of 7.7% the speed of light and 4 SC solenoids all operating at 4.5 K. This presentation will report: how we minimized the heat load into the 4 K and 80 K coolant streams feeding the cryomodule, a comparison of the calculated and measured static heat loads at 80 K and the mechanical design of the vacuum vessel.

  19. A New High Channel-Count, High Scan-Rate, Data Acquisition System for the NASA Langley Transonic Dynamics Tunnel

    NASA Technical Reports Server (NTRS)

    Ivanco, Thomas G.; Sekula, Martin K.; Piatak, David J.; Simmons, Scott A.; Babel, Walter C.; Collins, Jesse G.; Ramey, James M.; Heald, Dean M.

    2016-01-01

    A data acquisition system upgrade project, known as AB-DAS, is underway at the NASA Langley Transonic Dynamics Tunnel. AB-DAS will soon serve as the primary data system and will substantially increase the scan-rate capabilities and analog channel count while maintaining other unique aeroelastic and dynamic test capabilities required of the facility. AB-DAS is configurable, adaptable, and enables buffet and aeroacoustic tests by synchronously scanning all analog channels and recording the high scan-rate time history values for each data quantity. AB-DAS is currently available for use as a stand-alone data system with limited capabilities while development continues. This paper describes AB-DAS, the design methodology, and the current features and capabilities. It also outlines the future work and projected capabilities following completion of the data system upgrade project.

  20. Current Lead Design for the Accelerator Project for Upgrade of LHC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandt, Jeffrey S.; Cheban, Sergey; Feher, Sandor

    2010-01-01

    The Accelerator Project for Upgrade of LHC (APUL) is a U.S. project participating in and contributing to CERN's Large Hadron Collider (LHC) upgrade program. In collaboration with Brookhaven National Laboratory, Fermilab is developing sub-systems for an upgrade of the LHC final focus magnet systems. A concept of main and auxiliary helium flow was developed that allows the superconductor to remain cold while the lead body warms up to prevent upper section frosting. The auxiliary flow will subsequently cool the thermal shields of the feed box and the transmission line cryostats. A thermal analysis of the current lead central heat exchangemore » section was performed using analytic and FEA techniques. A method of remote soldering was developed that allows the current leads to be field replaceable. The remote solder joint was designed to be made without flux or additional solder, and able to be remade up to ten full cycles. A method of upper section attachment was developed that allows high pressure sealing of the helium volume. Test fixtures for both remote soldering and upper section attachment for the 13 kA lead were produced. The cooling concept, thermal analyses, and test results from both remote soldering and upper section attachment fixtures are presented.« less

  1. Threat radar system simulations

    NASA Astrophysics Data System (ADS)

    Miller, L.

    The capabilities, requirements, and goals of radar emitter simulators are discussed. Simulators are used to evaluate competing receiver designs, to quantify the performance envelope of a radar system, and to model the characteristics of a transmitted signal waveform. A database of candidate threat systems is developed and, in concert with intelligence data on a given weapons system, permits upgrading simulators to new projected threat capabilities. Four currently available simulation techniques are summarized, noting the usefulness of developing modular software for fast controlled-cost upgrades of simulation capabilities.

  2. The centrality of meta-programming in the ES-DOC eco-system

    NASA Astrophysics Data System (ADS)

    Greenslade, Mark

    2017-04-01

    The Earth System Documentation (ES-DOC) project is an international effort aiming to deliver a robust earth system model inter-comparison project documentation infrastructure. Such infrastructure both simplifies & standardizes the process of documenting (in detail) projects, experiments, models, forcings & simulations. In support of CMIP6, ES-DOC has upgraded its eco-system of tools, web-services & web-sites. The upgrade consolidates the existing infrastructure (built for CMIP5) and extends it with the introduction of new capabilities. The strategic focus of the upgrade is improvements in the documentation experience and broadening the range of scientific use-cases that the archived documentation may help deliver. Whether it is highlighting dataset errors, exploring experimental protocols, comparing forcings across ensemble runs, understanding MIP objectives, reviewing citations, exploring component properties of configured models, visualising inter-model relationships, scientists involved in CMIP6 will find the ES-DOC infrastructure helpful. This presentation underlines the centrality of meta-programming within the ES-DOC eco-system. We will demonstrate how agility is greatly enhanced by taking a meta-programming approach to representing data models and controlled vocabularies. Such an approach nicely decouples representations from encodings. Meta-models will be presented along with the associated tooling chain that forward engineers artefacts as diverse as: class hierarchies, IPython notebooks, mindmaps, configuration files, OWL & SKOS documents, spreadsheets …etc.

  3. Iowa DOT library services, collection & technology assessment.

    DOT National Transportation Integrated Search

    2014-07-01

    Assesses the impact of library services on research projects, proposes methods to improve the impact of : library services on research projects, assesses current library technology systems and proposes upgrades, : assesses current library collection ...

  4. Overview and Status of the Los Alamos PSR Injection Upgrade Project

    NASA Astrophysics Data System (ADS)

    Fitzgerald, D. H.; Ahn, H.; Blind, B.; Borden, M. J.; Macek, R. J.; Neri, F.; Rose, C. R.; Thiessen, H. A.; Wilkinson, C. A.; Zumbro, M. V.

    1997-05-01

    An upgrade is in progress to the Los Alamos Proton Storage Ring (PSR) to allow direct injection of the H^- beam into the ring and provide a beam bump system to move the circulating beam off the stripper foil. The primary benefits of this upgrade are matching the transverse phase space of the injected beam to the PSR acceptance and reduction of foil hits by the circulating beam by a factor of ten. Foil thickness is optimized to minimize the combination of circulating-beam losses plus losses due to excited H^0 states produced at injection. An overall factor of four reduction in losses is expected. The project comprises extensive modifications of the injection line, the injection section of the ring, and the waste-beam transport line. We will discuss the goals of the project, present an overview of the technical design, and describe the status of the implementation plan.

  5. Technical Report from Grant Recipient - City of Redlands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giorgianni, Kathleen Margaret

    2016-05-26

    The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system).

  6. Design and implementation of wire tension measurement system for MWPCs used in the STAR iTPC upgrade

    DOE PAGES

    Wang, Xu; Shen, Fuwang; Wang, Shuai; ...

    2017-04-06

    The STAR experiment at RHIC is planning to upgrade the Time Projection Chamber which lies at the heart of the detector. We have designed an instrument to measure the tension of the wires in the multi-wire proportional chambers (MWPCs) which will be used in the TPC upgrade. The wire tension measurement system causes the wires to vibrate and then it measures the fundamental frequency of the oscillation via a laser based optical platform. The platform can scan the entire wire plane, automatically, in a single run and obtain the wire tension on each wire with high precision. In this paper,more » the details about the measurement method and the system setup will be described. In addition, the test results for a prototype MWPC to be used in the STAR-iTPC upgrade will be presented.« less

  7. Design and implementation of wire tension measurement system for MWPCs used in the STAR iTPC upgrade

    NASA Astrophysics Data System (ADS)

    Wang, Xu; Shen, Fuwang; Wang, Shuai; Feng, Cunfeng; Li, Changyu; Lu, Peng; Thomas, Jim; Xu, Qinghua; Zhu, Chengguang

    2017-07-01

    The STAR experiment at RHIC is planning to upgrade the Time Projection Chamber which lies at the heart of the detector. We have designed an instrument to measure the tension of the wires in the multi-wire proportional chambers (MWPCs) which will be used in the TPC upgrade. The wire tension measurement system causes the wires to vibrate and then it measures the fundamental frequency of the oscillation via a laser based optical platform. The platform can scan the entire wire plane, automatically, in a single run and obtain the wire tension on each wire with high precision. In this paper, the details about the measurement method and the system setup will be described. In addition, the test results for a prototype MWPC to be used in the STAR-iTPC upgrade will be presented.

  8. DSN 70-meter antenna microwave optics design and performance improvements. Part 1: Design optimization

    NASA Technical Reports Server (NTRS)

    Bathker, D. A.; Slobin, S. D.

    1989-01-01

    The design optimizations associated with the microwave and structural upgrade of the DSN 64-m antennas are discussed. Expected area efficiency/gain performances at S- and X-band are given for both the original 64-m systems and the upgraded 70-m systems, and error estimates are developed. The DSN 70-m Upgrade Project specifications, based on predesign estimates, were 1.4-dB gain at S-band and 1.9-dB at X-band, with no degradation to critical receiving system noise temperatures. The measurements show an S-band gain increase of 1.9 dB and an average increase of 2.1 dB at X-band. The Project also delivered small receiving system noise decreases at both frequency bands. The three DSN 70-m antennas, in the initial state of mechanical adjustment as of the end of calendar year 1988, are performing with very high peak microwave area efficiencies at very nearly the engineering design expectations of 76 percent at S-band and 71 percent at X-band.

  9. Advances in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft E.; Johnson, James; Lewis, Hilton A.; Martin, Christopher; McLean, Ian S.; Wizinowich, Peter

    2012-09-01

    In this paper we describe both recently completed instrumentation projects and our current development efforts in terms of their role in the strategic plan, the key science areas they address, and their performance as measured or predicted. Projects reaching completion in 2012 include MOSFIRE, a near IR multi-object spectrograph, a laser guide star adaptive optics facility on the Keck I telescope, and an upgrade to the guide camera for the HIRES instrument on Keck I. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager (KCWI), an upgrade to the telescope control systems on both Keck telescopes, a near-IR tip/tilt sensor for the Keck I adaptive optics system, and a new grating for the OSIRIS integral field spectrograph.

  10. Diagnostic Systems Plan for the Advanced Light Source Top-OffUpgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barry, Walter; Chin, Mike; Robin, David

    2005-05-10

    The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations [1], in which electrons are quasi-continuously injected to produce constant stored beam current. The upgrade is structured in two phases. First, we will upgrade our injector from 1.5 GeV to 1.9 GeV to allow full energy injection and will start top-off operations. In the second phase, we will upgrade the Booster Ring (BR) with a bunch cleaning system to allow high bunch purity top-off injection. A diagnostics upgrade will be crucial for success in both phases of the top-off project, and our plan for it is describedmore » in this paper. New booster ring diagnostics will include updated beam position monitor (BPM) electronics, a tune monitoring system, and a new scraper. Two new synchrotron light monitors and a beam stop will be added to the booster-to-storage ring transfer line (BTS), and all the existing beam current monitors along the accelerator chain will be integrated into a single injection efficiency monitoring application. A dedicated bunch purity monitor will be installed in the storage ring (SR). Together, these diagnostic upgrades will enable smooth commissioning of the full energy injector and a quick transition to high quality top-off operation at the ALS.« less

  11. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1988-01-01

    Deep Space Network and Systems topics addressed include: tracking and ground-base navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; and network upgrading and sustaining.

  12. Low Level RF Control for the PIP-II Accelerator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Edelen, J. P.; Chase, B. E.; Cullerton, E.

    The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and the present status of the LLRF system for this project.

  13. The upgrade of the ATLAS first-level calorimeter trigger

    NASA Astrophysics Data System (ADS)

    Yamamoto, Shimpei; Atlas Collaboration

    2016-07-01

    The first-level calorimeter trigger (L1Calo) had operated successfully through the first data taking phase of the ATLAS experiment at the CERN Large Hadron Collider. Towards forthcoming LHC runs, a series of upgrades is planned for L1Calo to face new challenges posed by the upcoming increases of the beam energy and the luminosity. This paper reviews the ATLAS L1Calo trigger upgrade project that introduces new architectures for the liquid-argon calorimeter trigger readout and the L1Calo trigger processing system.

  14. Renovating a 65-year-old performing arts center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gifford, R.S.

    This article describes the HVAC, electrical and lighting systems that were upgraded in the renovations to the Wang Center for the Performing Arts. The renovations and restorations involved a complete restoration to elaborate interior finishes and a comprehensive upgrade of antiquated core mechanical and electrical systems in a 65-year-old performing arts theater. A new thermal storage cooling system, a new electrical power distribution system, new lighting systems and a new fire protection system were accomplished simultaneously as the theater interior was completely refinished with meticulous detail. The project offered a rare opportunity to integrate current technology with what may atmore » first appear to be obsolete systems to enable the original architectural grandeur to be maintained, yet be fully functional to meet the demanding requirements of a modern performing arts center. It is an example of a successful project that was completed within a very aggressive construction schedule and within a controlled budget.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Champion, Mark S; Dean, Robert A; Galambos, John D

    The Proton Power Upgrade Project is underway at the Spallation Neutron Source at Oak Ridge National Labor-atory and will double the proton beam power capability from 1.4 MW to 2.8 MW to provide increased neutron intensity at the first target station and to support future operation of the second target station. This will be ac-complished by increasing the beam energy to 1.3 GeV and the beam current to 38 mA (average during the macropulse). Installation of 28 additional superconduct-ing cavities and their associated technical systems will provide for the energy increase. Increased beam loading throughout the accelerator will be accommodatedmore » primar-ily through the use of existing margin in the RF systems and the installation of 700 kW klystrons to power the new superconducting cavities. Upgrades of a few existing RF stations may also be needed. The injection and ex-traction regions of the accumulator ring will be upgraded, a ring to second target station tunnel stub will be con-structed, and a 2 MW target will be developed for the first target station. The project anticipates attainment of Criti-cal Decision 1 in 2017 to ratify the project conceptual design and cost range.« less

  16. Case Study of the Space Shuttle Cockpit Avionics Upgrade Software

    NASA Technical Reports Server (NTRS)

    Ferguson, Roscoe C.; Thompson, Hiram C.

    2005-01-01

    The purpose of the Space Shuttle Cockpit Avionics Upgrade project was to reduce crew workload and improve situational awareness. The upgrade was to augment the Shuttle avionics system with new hardware and software. An early version of this system was used to gather human factor statistics in the Space Shuttle Motion Simulator of the Johnson Space Center for one month by multiple teams of astronauts. The results were compiled by NASA Ames Research Center and it was was determined that the system provided a better than expected increase in situational awareness and reduction in crew workload. Even with all of the benefits nf the system, NASA cancelled the project towards the end of the development cycle. A major success of this project was the validation of the hardware architecture and software design. This was significant because the project incorporated new technology and approaches for the development of human rated space software. This paper serves as a case study to document knowledge gained and techniques that can be applied for future space avionics development efforts. The major technological advances were the use of reflective memory concepts for data acquisition and the incorporation of Commercial off the Shelf (COTS) products in a human rated space avionics system. The infused COTS products included a real time operating system, a resident linker and loader, a display generation tool set, and a network data manager. Some of the successful design concepts were the engineering of identical outputs in multiple avionics boxes using an event driven approach and inter-computer communication, a reconfigurable data acquisition engine, the use of a dynamic bus bandwidth allocation algorithm. Other significant experiences captured were the use of prototyping to reduce risk, and the correct balance between Object Oriented and Functional based programming.

  17. Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Robert C.; Smith, Ryan; Wright, Mark

    This project is part of a collaboration effort between Iowa State University (ISU), University of Oklahoma (OK) and Pacific Northwest National Laboratory (PNNL). The purpose of this project is to stabilize bio-oil fractions and improve their suitability for insertion into petroleum refineries. Bio-oil from fast pyrolysis of biomass is a complex mixture of unstable organic compounds. These organic compounds react under standard room conditions resulting in increases in bio-oil viscosity and water content – both detrimental for bio-oil storage and transportation. This study employed fractionation and upgrading systems to improve the stability of bio-oil. The fractionation system consists of amore » series of condensers, and electrostatic precipitators designed to separate bio-oil into five fractions: soluble carbohydrates (SF1&2), clean phenolic oligomers (CPO) and middle fraction (SF3&4), light oxygenates (SF5). A two-stage upgrading process was designed to process bio-oil stage fractions into stable products that can be inserted into a refinery. In the upgrading system, heavy and middle bio-oil fractions were upgraded into stable oil via cracking and subsequent hydrodeoxygenation. The light oxygenate fraction was steam reformed to provide a portion of requisite hydrogen for hydroprocessing. Hydrotreating and hydrocracking employed hydrogen from natural gas, fuel gas and light oxygenates reforming. The finished products from this study consist of gasoline- and diesel-blend stock fuels.« less

  18. Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stillwell, B.; Brajuskovic, B.; Carter, J.

    A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities andmore » some of what has been learned to date will be shared.« less

  19. Skill Upgrading, Incorporated. Final Report.

    ERIC Educational Resources Information Center

    Skill Upgrading, Inc., Baltimore, MD.

    As in two other projects in Cleveland and Newark, New Jersey, this project was set up in Baltimore to provide technical assistance in designing ways to meet in-plant skills needs by upgrading job skills on entry workers through High Intensity Training (HIT). Skill Upgrading, Inc. was established in Maryland to provide training and manpower…

  20. Upgrade of Irradiation Test Capability of the Experimental Fast Reactor Joyo

    NASA Astrophysics Data System (ADS)

    Sekine, Takashi; Aoyama, Takafumi; Suzuki, Soju; Yamashita, Yoshioki

    2003-06-01

    The JOYO MK-II core was operated from 1983 to 2000 as fast neutron irradiation bed. In order to meet various requirements for irradiation tests for development of FBRs, the JOYO upgrading project named MK-III program was initiated. The irradiation capability in the MK-III core will be about four times larger than that of the MK-II core. Advanced irradiation test subassemblies such as capsule type subassembly and on-line instrumentation rig are planned. As an innovative reactor safety system, the irradiation test of Self-Actuated Shutdown System (SASS) will be conducted. In order to improve the accuracy of neutron fluence, the core management code system was upgraded, and the Monte Carlo code and Helium Accumulation Fluence Monitor (HAFM) were applied. The MK-III core is planned to achieve initial criticality in July 2003.

  1. Performance of the Prototype Readout System for the CMS Endcap Hadron Calorimeter Upgrade

    NASA Astrophysics Data System (ADS)

    Chaverin, Nate; Dittmann, Jay; Hatakeyama, Kenichi; Pastika, Nathaniel; CMS Collaboration

    2016-03-01

    The Compact Muon Solenoid (CMS) experiment at the CERN Large Hadron Collider (LHC) will upgrade the photodetectors and readout systems of the endcap hadron calorimeter during the technical stop scheduled for late 2016 and early 2017. A major milestone for this project was a highly successful testbeam run at CERN in August 2015. The testbeam run served as a full integration test of the electronics, allowing a study of the response of the preproduction electronics to the true detector light profile, as well as a test of the light yield of various new plastic scintillator materials. We present implications for the performance of the hadron calorimeter front-end electronics based on testbeam data, and we report on the production status of various components of the system in preparation for the upgrade.

  2. Environmental Assessment Upgrade of the Indian Springs Collection and Treatment System

    DTIC Science & Technology

    2009-12-10

    site is voluntary . Alternatively, if the proposed project is federally funded in whole or a significant portion, we understand that the project may be...a veterinarian proficient in reptile medicine for evaluation of appropriate treatment. Rehabilitation or euthanasia expenses will not be covered by

  3. Structural Analysis of Thermal Shields During a Quench of a Torus Magnet for the 12 GeV Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pastor, Orlando; Willard, Thomas; Ghoshal, Probir K.

    A toroidal magnet system consisting of six superconducting coils is being built for the Jefferson Lab 12- GeV accelerator upgrade project. This paper details the analysis of eddy current effects during a quench event on the aluminum thermal shield. The shield has been analyzed for mechanical stresses induced as a result of a coil quench as well as a fast discharge of the complete magnet system. The shield has been designed to reduce the eddy current effects and result in stresses within allowable limits.

  4. Upgrading in an Industrial Setting. Final Report.

    ERIC Educational Resources Information Center

    Russell, Wendell

    The project objectives were: (1) to assess existing industrial upgrading practices in an Atomic Energy Commission contractor organization, (2) to design new alternative upgrading methods, (3) to experiment with new upgrading methods, (4) to plan for utilization of proven upgrading programs, and (5) to document and disseminate activities. A twelve…

  5. 40 CFR 35.3520 - Systems, projects, and project-related costs eligible for assistance from the Fund.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or upgrade of eligible storage facilities, including finished water reservoirs, to prevent... undertake feasible and appropriate changes in operations to ensure compliance over the long-term. (3... development strategy. (3) Reservoirs or rehabilitation of reservoirs, except for finished water reservoirs and...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Xu; Shen, Fuwang; Wang, Shuai

    The STAR experiment at RHIC is planning to upgrade the Time Projection Chamber which lies at the heart of the detector. We have designed an instrument to measure the tension of the wires in the multi-wire proportional chambers (MWPCs) which will be used in the TPC upgrade. The wire tension measurement system causes the wires to vibrate and then it measures the fundamental frequency of the oscillation via a laser based optical platform. The platform can scan the entire wire plane, automatically, in a single run and obtain the wire tension on each wire with high precision. In this paper,more » the details about the measurement method and the system setup will be described. In addition, the test results for a prototype MWPC to be used in the STAR-iTPC upgrade will be presented.« less

  7. KSC-2014-2293

    NASA Image and Video Library

    2014-04-24

    CAPE CANAVERAL, Fla. – Modifications continue on the Multi-Payload Processing Facility, or MPPF, at NASA's Kennedy Space Center in Florida. Inside the high bay, Skip Williams, Ground Systems Development and Operations, or GSDO, deputy project manager for the spacecraft offline element integration team, points out artist illustrations of how the MPPF's interior and exterior will look after modifications and upgrades have been completed. Kennedy's Center Operations Directorate is overseeing upgrades to the MPPF for GSDO Program. The extensive upgrades and modernizations will support processing of Orion spacecraft for NASA's exploration missions. The 19,647-square-foot building, originally constructed in 1995, primarily will be used for Orion hypergolic fueling, ammonia servicing and high-pressure gas servicing and checkout before being transported to the Vehicle Assembly Building for integration with the Space Launch System. Photo credit: NASA/Daniel Casper

  8. SLHC, the High-Luminosity Upgrade (public event)

    ScienceCinema

    None

    2017-12-09

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  9. Distribution and Room Air Mixing Risks to Retrofitted Homes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    2014-12-01

    An energy efficiency upgrade reduces a home’s heating and cooling load. If the load reduction is great enough and the heating, ventilation, and air conditioning system warrants replacement, that system is often upgraded with a more efficient, lower capacity system that meets the load of the upgraded house. For a single-story house with floor supply air diffusers, the ducts often are removed and upgraded. For houses with ducts that are embedded in walls, the cost of demolition precludes the replacement of ducts. The challenge with the use of existing ducts is that the reduced airflow creates a decreased throw atmore » the supply registers, and the supply air and room air do not mix well, leading to potential thermal comfort complaints. This project investigates this retrofit scenario. The issues and solutions discussed here are relevant to all climate zones, with emphasis on climates that require cooling. In this project, IBACOS performed load calculations for a two-story 1960s house and characterized duct sizes and layouts based on industry “rules of thumb” (Herk et al. 2014). The team performed duct-sizing calculations for unaltered ducts and post-retrofit airflows and examined airflow velocities and pressure changes with respect to various factors. The team then used a mocked-up duct and register setup to measure the characteristics of isothermal air—to reduce the effects of buoyancy from the observations—passing through the duct and leaving the register.« less

  10. Prototypes and system test stands for the Phase 1 upgrade of the CMS pixel detector

    DOE PAGES

    Hasegawa, S.

    2016-04-23

    The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/2017. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line associated with trigger rate increases. This effect is duemore » to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was confirmed at the expected detector operation temperature ($-$20 °C).« less

  11. The XENONnT Dark Matter Experiment

    NASA Astrophysics Data System (ADS)

    Aprile, Elena; Xenon Collaboration

    2017-01-01

    With XENON1T ready to search for dark matter with the highest sensivity of any experiment to-date the XENON collaboration started to secure funding and resources to upgrade the detector by the end of 2018- phase which we refer to as XENONnT. The XENONnT experiment will utilize the already-built-and-tested XENON1T infrastructures, such as the cryogenic system, Kr distillation system and Xe storage and recovery system, with the main upgrade of the time projection chamber (TPC). The upgraded XENONnT detector will be filled with 7.5-ton ultra-pure liquid xenon, tripling the active liquid xenon target mass of XENON1T. About 500 low-radioactive three-inch R11410 PMTs will be used. Background from internal sources such as radon will be reduced. It will enable another order of magnitude improvement in dark matter search sensitivity compared to that of XENON1T, or accumulate statistics if a positive dark matter signal is observed by XENON1T. The detailed TPC upgrade plan, the background control and reduction techniques, the predicted sensitivity reach will be presented.

  12. Resource and energy management of synfuels production with hydrogen and oxygen requirements from electrolysis

    NASA Astrophysics Data System (ADS)

    Shannon, R. H.; Richardson, R. D.

    The Resource and Energy Management System (REM), which uses electrolytic H2 and O2 to produce synthetic crude and light oils from heavy hydrocarbons is described. The heavy hydrocarbon feedstocks include heavy oils, tar sand bitumens, heavy residual oils, oil shale kerogens, liquefied coal, and pyrolytically-extracted coal liquids. The system includes mini-upgraders, which can be implemented in modular form, to pump electrolytically-derived H2 into heavy oils to upgrade their energy content. Projected costs for the production of synthetic light oils using U.S. coal reserves with the REM process after liquefaction are $30-35/bbl, with the H2 costs being a controlling factor. The modular systems could be built in a much shorter time frame than much larger projects, and would be instrumental in establishing the electrolytic H2 production infrastructure needed for eventual full conversion to an H2-based economy.

  13. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1987-01-01

    Topics addressed include: tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; network upgrade and sustaining; mission interface and support; and Ka-band capabilities.

  14. High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, L.E.; McGuire, D.R.

    1984-05-01

    This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less

  15. The Employment Impact of the Des Moines Occupational Upgrading Project and Model Cities High School Equivalency Project: Project Year One Evaluation.

    ERIC Educational Resources Information Center

    Palomba, Neil A.; And Others

    This study was conducted to: (1) evaluate the Occupational Upgrading Project (OUP) and the Model Neighborhood High School Equivalency (HSE) Project's first year of operation, and (2) create baseline data from which future and more conclusive evaluation can be undertaken. Data were gathered by conducting open-ended interviews with the…

  16. Muon Physics at Run-I and its upgrade plan

    NASA Astrophysics Data System (ADS)

    Benekos, Nektarios Chr.

    2015-05-01

    The Large Hadron Collider (LHC) and its multi-purpose Detector, ATLAS, has been operated successfully at record centre-of-mass energies of 7 and TeV. After this successful LHC Run-1, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. To cope with the corresponding rate increase, the ATLAS detector needs to be upgraded. The upgrade will proceed in two steps: Phase I in the LHC shutdown 2018/19 and Phase II in 2023-25. The largest of the ATLAS Phase-1 upgrades concerns the replacement of the first muon station of the highrapidity region, the so called New Small Wheel. This configuration copes with the highest rates expected in Phase II and considerably enhances the performance of the forward muon system by adding triggering functionality to the first muon station. Prospects for the ongoing and future data taking are presented. This article presents the main muon physics results from LHC Run-1 based on a total luminosity of 30 fb^-1. Prospects for the ongoing and future data taking are also presented. We will conclude with an update of the status of the project and the steps towards a complete operational system, ready to be installed in ATLAS in 2018/19.

  17. Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less

  18. Experience and results of the 1991 MTLRS-1 USSR campaign

    NASA Technical Reports Server (NTRS)

    Sperber, Peter; Hauck, H.

    1993-01-01

    The year 1991 was a special year for the mobile laser ranging systems. Due to the scheduled upgrades of the Modular Transportable Laser Ranging Systems, MTLRS#1 and MTLRS#2, neither a WEGENER MEDLAS nor a Crustal Dynamics Project campaign was carried out in 1991. After the successful upgrade of MTLRS#1 in the first half of 1991 the system departed from Wettzell in August to make measurements at two sites in the USSR. In Riga/Latvia, we operated close to the fixed SLR system. In Simeiz/Ucrainea, the place for MTLRS#1 pad was choosen to collocate the two fixed SLR stations in Simeiz (300 m distance to MTLRS#1) and Kazivelli (about 3 km distance).

  19. Anticipating Stimulus Money for Campus Projects, Colleges Get "Shovel Ready"

    ERIC Educational Resources Information Center

    Carlson, Scott

    2009-01-01

    Help for colleges may be on the way in the $825-billion stimulus package being pressed by Congressional leaders. The bill that House Democrats introduced this month includes $7-billion for higher-education modernization, renovation, and repair that could kick-start projects like upgrading heating and cooling systems, fixing roofs, and doing…

  20. Cultural Literacy. Learning Package No. 44.

    ERIC Educational Resources Information Center

    Hong, Zhang, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on cultural literacy is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving an…

  1. Journal Writing. Learning Package No. 34.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on journal writing is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving an…

  2. Avoiding Preconceptions in School Construction

    ERIC Educational Resources Information Center

    Maletz, Andrew

    2012-01-01

    An existing facility that is being upgraded or retrofitted today typically is 30 to 45 years old, often with limited natural light, antiquated mechanical systems and retrofitted technology. All too often at the outset of a project, the broader project goals--and even those narrower in scope--seem daunting or altogether impossible when staring at a…

  3. Get a winning Oracle upgrade session using the quarterback approach

    NASA Technical Reports Server (NTRS)

    Anderson, G.

    2002-01-01

    Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

  4. The Telecommunications and Data Aquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    Tracking and ground-based navigation techniques are discussed in relation to DSN advanced systems. Network data processing and productivity are studied to improve management planning methods. Project activities for upgrading DSN facilities are presented.

  5. 77 FR 71585 - Eastern Shore Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Compressor Station Upgrade Project and Request for Comments on Environmental Issues The staff of the Federal... discuss the environmental impacts of the Daleville Compressor Station Upgrade Project (Project) involving... compressor engines at its existing Daleville Compressor Station in Chester County, Pennsylvania. One...

  6. ALA Meets at Ground-Zero, New York City Conference Report.

    ERIC Educational Resources Information Center

    Wilson Library Bulletin, 1986

    1986-01-01

    Description of 1986 American Library Association Conference summarizes significant organizational actions and presentations on upgrading automation systems, censorship, federal libraries, fees and public library services, black community information needs, Linked Systems Project, libraries and the homeless, new products exhibited, and 1994…

  7. 77 FR 15118 - Buy American Exceptions Under the American Recovery and Reinvestment Act of 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... heat pumps for the Skyline Crest Sustainability Upgrade project. FOR FURTHER INFORMATION CONTACT... Skyline Crest Sustainability Upgrade project. The exception was granted by HUD on the basis that the...

  8. Development of Micro-Level Curriculum Content

    ERIC Educational Resources Information Center

    Koncelik, Joseph

    1977-01-01

    A course on design for aging populations, developed at Ohio State University, is described. Student-team projects included designs for an upgraded signage system for apartment dwellers, outdoor furniture, and recreational area in a nursing home. (LBH)

  9. Writing Strategies for Gifted Children. Learning Package No. 45.

    ERIC Educational Resources Information Center

    Hyslop, Nancy; Smith, Carl, Comp.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on writing strategies for gifted children is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a…

  10. Making Writing Public. Learning Package No. 35.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on making writing public is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving an…

  11. Reading Programs for Gifted Readers. Learning Package No. 28.

    ERIC Educational Resources Information Center

    Collins, Norma, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on reading programs for gifted readers is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a…

  12. Children and the Library. Learning Package No. 41.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on children and the library is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving…

  13. Integrating the Language Arts. Learning Package No. 48.

    ERIC Educational Resources Information Center

    Chao, Han-Hua, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on integrating the language arts is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture…

  14. Spelling and the Writing Process. Learning Package No. 36.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on spelling and the writing process is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture…

  15. Strategic Thinking through Writing. Learning Package No. 37.

    ERIC Educational Resources Information Center

    Hong, Zhang, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on strategic thinking through writing is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a…

  16. Developing Listening and Speaking Skills. Learning Package No. 46.

    ERIC Educational Resources Information Center

    Hyslop, Nancy, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on developing listening and speaking skills is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a…

  17. Appreciation of Literature. Learning Package No. 49.

    ERIC Educational Resources Information Center

    Kelly, Dawn, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on appreciating literature is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving an…

  18. Writing Apprehension and the Writing Process. Learning Package No. 32.

    ERIC Educational Resources Information Center

    Collins, Norma, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on writing apprehension and the writing process is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC…

  19. Writing across the Curriculum. Learning Package No. 50.

    ERIC Educational Resources Information Center

    Kelly, Dawn, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on writing across the curriculum is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture…

  20. Ways To Evaluate Writing. Learning Package No. 47.

    ERIC Educational Resources Information Center

    Hyslop, Nancy, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on ways to evaluate writing is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving…

  1. Computers and Writing. Learning Package No. 33.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on computers and writing is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving an…

  2. The Relationship between Reading and Writing. Learning Package No. 40.

    ERIC Educational Resources Information Center

    Collins, Norma, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on the relationship between reading and writing is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC…

  3. Writing as Exploration. Learning Package No. 31.

    ERIC Educational Resources Information Center

    Collins, Norma, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on expressive writing is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving an…

  4. Environmentally Responsible Aviation Project: Infrastructure Enhancements and New Capabilities

    NASA Technical Reports Server (NTRS)

    Bezos-OConnor, Gaudy M.

    2015-01-01

    This oral presentation highlights the technical investments the NASA Environmentally Responsible Aviation Project under the Integrated Systems Research Program within ARMD made during FY10-FY14 to upgrade/enhance the NASA infrastructure/testing assets and new capabilities required to mature the ERA N=2 Portfolio of airframe and propulsion technologies to TRL 5/6.

  5. 75 FR 10866 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... rotating drum filter upgrades and a water quality monitoring system expansion, are not available from... quality. Expansion of the recirculation system requires adding a second drum filter for aquaculture water treatment. The existing system uses a drum filter manufactured by PRAqua Supplies Ltd.--Nanaimo, British...

  6. Textbooks on the Move: Transforming a Textbook Collection

    ERIC Educational Resources Information Center

    Ferguson, Yoko Inagi; Riley-Reid, Trevar

    2017-01-01

    Recently, The City College of New York (CCNY) libraries engaged in a collaborative project to transfer the bibliographic holdings for textbook course reserves to a new module when their integrated library systems, the Ex Libris Aleph Integrated Library System, underwent a system upgrade. In this article, the Chief of Circulation and the Chief of…

  7. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    NASA Technical Reports Server (NTRS)

    Dudley, Stephanie R. B.; Marsh, Angela L.

    2014-01-01

    With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

  8. 2.1 meter (82 inch) Slip Ring By-Pass Project

    NASA Astrophysics Data System (ADS)

    Bryan, Corby B.

    2006-12-01

    2.1 meter (82 inch) Slip Ring By-Pass Project I will describe a project to bypass the old method of getting control communications above the rotation point of the McDonald Observatory 2.1 meter dome. The old method used slip rings that were implemented in the late 1930s. The new system uses wireless serial commands which allow the control lines to be taken off the slip rings, leaving only power and ground. I will describe how the concept was devised so the slip rings could be by-passed, what micro-controller system that was decided on and used, how the wireless units were set up and finally how the system was tested and put in place with only limited tasks to control. (I.E. the opening and closing of the shutters) We describe the advantages to making this upgrade and how it could benefit any telescope interested in upgrading its communication systems. This project was designed and tested in ten weeks during the McDonald Observatory REU and was supported under NSF AST-0243745. The system was designed so that it could be installed while running side by side with the current method of getting control to the above rotation point. The method is still in place being tested on the 2.1 meter telescope and will soon be fully implemented by the University of Texas McDonald Observatory OS staff.

  9. Towards a resilience management framework for complex enterprise systems upgrade implementation

    NASA Astrophysics Data System (ADS)

    Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif

    2017-05-01

    The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.

  10. Project SETT-UP: Special Education via Telecommunications, Teacher Upgrade. Five Year Report, June 1, 1976-August 31, 1981.

    ERIC Educational Resources Information Center

    Curtis, John A.

    The 5 year report on Project SETT-UP (Special Education via Telecommunications--Teacher Upgrade), a two way telecommunications inservice training project in southeastern Virginia, is presented. The report is organized into three sections concerned with personnel involved in the program, achievement of program objectives, and special program…

  11. Report of the Virginia Traffic Records Feasibility Study Team to the State Traffic Records Committee.

    DOT National Transportation Integrated Search

    1973-01-01

    The purpose of the study was to define the current traffic records system of the Commonwealth so as to identify deficiencies as specifically as possible; to suggest changes to upgrade the system to meet current and projected demands at maximum effici...

  12. Opening

    ScienceCinema

    Bruning, Oliver

    2018-05-23

    Overview of the operation and upgrade plans for the machine. Upgrade studies and taskforces. The Chamonix 2010 discussions led to five new task forces: planning for a long shut down in 2012 for splice consolidation; long term consolidation planning for the injector complex; SPS upgrade task force (accelerated program for SPS upgrade); PSB upgrade and its implications for the PS (e.g. radiation etc.); LHC High Luminosity project (investigate planning for ONE upgrade by 2018-2020); Launch of a dedicated study for doubling the beam energy in the LHC->HE-LHC.

  13. Robotic acquisition programs: technical and performance challenges

    NASA Astrophysics Data System (ADS)

    Thibadoux, Steven A.

    2002-07-01

    The Unmanned Ground Vehicles/ Systems Joint Project Office (UGV/S JPO) is developing and fielding a variety of tactical robotic systems for the Army and Marine Corps. The Standardized Robotic System (SRS) provides a family of common components that can be installed in existing military vehicles, to allow unmanned operation of the vehicle and its payloads. The Robotic Combat Support System (RCSS) will be a medium sized unmanned system with interchangeable attachments, allowing a remote operator to perform a variety of engineering tasks. The Gladiator Program is a USMC initiative for a small to medium sized, highly mobile UGV to conduct scout/ surveillance missions and to carry various lethal and non-lethal payloads. Acquisition plans for these programs require preplanned evolutionary block upgrades to add operational capability, as new technology becomes available. This paper discusses technical and performance issues that must be resolved and the enabling technologies needed for near term block upgrades of these first generation robotic systems. Additionally, two Joint Robotics Program (JRP) initiatives, Robotic Acquisition through Virtual Environments and Networked Simulations (RAVENS) and Joint Architecture for Unmanned Ground Systems (JAUGS), will be discussed. RAVENS and JAUGS will be used to efficiently evaluate and integrate new technologies to be incorporated in system upgrades.

  14. Prospects for the Thomson scattering system on NSTX-Upgrade.

    PubMed

    Diallo, A; LeBlanc, B P; Labik, G; Stevens, D

    2012-10-01

    The paper discusses the projected configuration of the Thomson system on the National Spherical Torus Experiment (NSTX-U). In this paper, we discuss the projected configuration of the Thomson system on NSTX-U. More specifically, we determine, through both optical modeling of the collection optics and in-vessel measurements, that the collecting fibers are to be displaced by at most 1 cm toward the imaging plane along the optical axis. Finally, we estimate the performance of the Thomson system in measuring the electron temperature for NSTX-U discharges.

  15. Classroom Drama as an Instructional Tool. Learning Package No. 42.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on classroom drama as an instructional tool is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a…

  16. Peer Response in Learning to Write. Learning Package No. 38.

    ERIC Educational Resources Information Center

    Chao, Han-Hua, Comp.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on peer response in learning to write is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a…

  17. Organizing the Classroom for an Expansive Reading Curriculum. Learning Package No. 29.

    ERIC Educational Resources Information Center

    Chao, Han-Hua, Comp.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on classroom organization for an expansive reading curriculum is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the…

  18. Vocabulary Expansion Improves Reading and Learning. Learning Package No. 30.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on the role of vocabulary in reading and learning is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC…

  19. What Works? Summary of Research about Teaching Reading. Learning Package No. 26.

    ERIC Educational Resources Information Center

    Smith, Carl, Comp.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on reasearch about teaching and learning reading is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC…

  20. Language Learning and the Young Child. Learning Package No. 43.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on language learning and the young child is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a…

  1. Collaborative engineering and design management for the Hobby-Eberly Telescope tracker upgrade

    NASA Astrophysics Data System (ADS)

    Mollison, Nicholas T.; Hayes, Richard J.; Good, John M.; Booth, John A.; Savage, Richard D.; Jackson, John R.; Rafal, Marc D.; Beno, Joseph H.

    2010-07-01

    The engineering and design of systems as complex as the Hobby-Eberly Telescope's* new tracker require that multiple tasks be executed in parallel and overlapping efforts. When the design of individual subsystems is distributed among multiple organizations, teams, and individuals, challenges can arise with respect to managing design productivity and coordinating successful collaborative exchanges. This paper focuses on design management issues and current practices for the tracker design portion of the Hobby-Eberly Telescope Wide Field Upgrade project. The scope of the tracker upgrade requires engineering contributions and input from numerous fields including optics, instrumentation, electromechanics, software controls engineering, and site-operations. Successful system-level integration of tracker subsystems and interfaces is critical to the telescope's ultimate performance in astronomical observation. Software and process controls for design information and workflow management have been implemented to assist the collaborative transfer of tracker design data. The tracker system architecture and selection of subsystem interfaces has also proven to be a determining factor in design task formulation and team communication needs. Interface controls and requirements change controls will be discussed, and critical team interactions are recounted (a group-participation Failure Modes and Effects Analysis [FMEA] is one of special interest). This paper will be of interest to engineers, designers, and managers engaging in multi-disciplinary and parallel engineering projects that require coordination among multiple individuals, teams, and organizations.

  2. Preoperational test report, recirculation ventilation systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifton, F.T.

    1997-11-11

    This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  3. Expanding the City of Moscow field lab data collection capabilities.

    DOT National Transportation Integrated Search

    2012-07-01

    The city of Moscow signal integration project, completed at the end of 2009, improved the citys traffic signal system by : connecting the citys seventeen signalized intersections with a fiber optic network, upgrading the cabinets to TS2 Type 1 ...

  4. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    Grid Modernization Project Informed by ESIF Research The Hawaii Public Utilities Commission approved on (HECO) to upgrade its five island power grids. The plan describes the scope and estimated cost to update the energy networks of Hawaiian Electric, Maui Electric, and Hawaii Electric Light in the next five

  5. Utilizing Regional Centers in Sustaining Upgraded Russian Federation Ministry of Defense Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaldenbach, Karen Yvonne; Chainikov, General Vladimir; Fedorov, General Victor

    2010-01-01

    Since the mid-1990s the governments of the United States (U.S.) and the Russian Federation (RF) have been collaborating on nonproliferation projects, particularly in the protection of nuclear material through the Department of Energy's (DOE) National Nuclear Security Administration (NNSA). To date, this collaboration has resulted in upgrades to more than 72 RF Ministry of Defense (MOD) sensitive sites and facilities. These upgrades include physical protection systems (PPS), facilities to ensure material remains secure in various configurations, and infrastructure to support, maintain, and sustain upgraded sites. Significant effort on the part of both governments has also been expended to ensure thatmore » personnel obtain the necessary skills and training to both operate and maintain the security systems, thereby ensuring long term sustainability. To accomplish this, initial vendor training on physical protection systems was provided to key personnel, and an approved training curriculum was developed to teach the skills of operating, managing, administering, and maintaining the installed physical protection systems. This approach also included documentation of the processes and procedures to support infrastructure, requisite levels of maintenance and testing of systems and equipment, lifecycle management support, inventory systems and spare parts caches. One of the core components in the U.S. exit strategy and full transition to the RF MOD is the development and utilization of regional centers to facilitate centralized training and technical support to upgraded MOD sites in five regions of the RF. To date, two regional centers and one regional classroom facility are functional, and two additional regional centers are currently under construction. This paper will address the process and logistics of regional center establishment and the future vision for integrated regional center support by the RF MOD.« less

  6. Case Study of Using High Performance Commercial Processors in Space

    NASA Technical Reports Server (NTRS)

    Ferguson, Roscoe C.; Olivas, Zulema

    2009-01-01

    The purpose of the Space Shuttle Cockpit Avionics Upgrade project (1999 2004) was to reduce crew workload and improve situational awareness. The upgrade was to augment the Shuttle avionics system with new hardware and software. A major success of this project was the validation of the hardware architecture and software design. This was significant because the project incorporated new technology and approaches for the development of human rated space software. An early version of this system was tested at the Johnson Space Center for one month by teams of astronauts. The results were positive, but NASA eventually cancelled the project towards the end of the development cycle. The goal to reduce crew workload and improve situational awareness resulted in the need for high performance Central Processing Units (CPUs). The choice of CPU selected was the PowerPC family, which is a reduced instruction set computer (RISC) known for its high performance. However, the requirement for radiation tolerance resulted in the re-evaluation of the selected family member of the PowerPC line. Radiation testing revealed that the original selected processor (PowerPC 7400) was too soft to meet mission objectives and an effort was established to perform trade studies and performance testing to determine a feasible candidate. At that time, the PowerPC RAD750s were radiation tolerant, but did not meet the required performance needs of the project. Thus, the final solution was to select the PowerPC 7455. This processor did not have a radiation tolerant version, but had some ability to detect failures. However, its cache tags did not provide parity and thus the project incorporated a software strategy to detect radiation failures. The strategy was to incorporate dual paths for software generating commands to the legacy Space Shuttle avionics to prevent failures due to the softness of the upgraded avionics.

  7. Case Study of Using High Performance Commercial Processors in a Space Environment

    NASA Technical Reports Server (NTRS)

    Ferguson, Roscoe C.; Olivas, Zulema

    2009-01-01

    The purpose of the Space Shuttle Cockpit Avionics Upgrade project was to reduce crew workload and improve situational awareness. The upgrade was to augment the Shuttle avionics system with new hardware and software. A major success of this project was the validation of the hardware architecture and software design. This was significant because the project incorporated new technology and approaches for the development of human rated space software. An early version of this system was tested at the Johnson Space Center for one month by teams of astronauts. The results were positive, but NASA eventually cancelled the project towards the end of the development cycle. The goal to reduce crew workload and improve situational awareness resulted in the need for high performance Central Processing Units (CPUs). The choice of CPU selected was the PowerPC family, which is a reduced instruction set computer (RISC) known for its high performance. However, the requirement for radiation tolerance resulted in the reevaluation of the selected family member of the PowerPC line. Radiation testing revealed that the original selected processor (PowerPC 7400) was too soft to meet mission objectives and an effort was established to perform trade studies and performance testing to determine a feasible candidate. At that time, the PowerPC RAD750s where radiation tolerant, but did not meet the required performance needs of the project. Thus, the final solution was to select the PowerPC 7455. This processor did not have a radiation tolerant version, but faired better than the 7400 in the ability to detect failures. However, its cache tags did not provide parity and thus the project incorporated a software strategy to detect radiation failures. The strategy was to incorporate dual paths for software generating commands to the legacy Space Shuttle avionics to prevent failures due to the softness of the upgraded avionics.

  8. Students Upgrading Mathematical Achievement Project SUMA--1989. Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Barrera, Marbella

    Students Upgrading Mathematical Achievement (SUMA) is a part of the Bilingual Mathematics and Science Achievement project for Spanish-speaking Limited English Proficient (LEP) students. Its objective is to provide both remedial tutoring to students lacking mathematics skills and enrichment to students who are potentially gifted in mathematics.…

  9. U.S. Department of Energy physical protection upgrades at the Latvian Academy of Sciences Nuclear Research Center, Latvia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haase, M.; Hine, C.; Robertson, C.

    1996-12-31

    Approximately five years ago, the Safe, Secure Dismantlement program was started between the US and countries of the Former Soviet Union (FSU). The purpose of the program is to accelerate progress toward reducing the risk of nuclear weapons proliferation, including such threats as theft, diversion, and unauthorized possession of nuclear materials. This would be accomplished by strengthening the material protection, control, and accounting systems within the FSU countries. Under the US Department of Energy`s program of providing cooperative assistance to the FSU countries in the areas of Material Protection, Control, and Accounting (MPC and A), the Latvian Academy of Sciencesmore » Nuclear Research Center (LNRC) near Riga, Latvia, was identified as a candidate site for a cooperative MPC and A project. The LNRC is the site of a 5-megawatt IRT-C pool-type research reactor. This paper describes: the process involved, from initial contracting to project completion, for the physical protection upgrades now in place at the LNRC; the intervening activities; and a brief overview of the technical aspects of the upgrades.« less

  10. FMEA on the superconducting torus for the Jefferson Lab 12 GeV accelerator upgrade

    DOE PAGES

    Ghoshal, Probir K.; Biallas, George H.; Fair, Ruben J.; ...

    2015-01-16

    As part of the Jefferson Lab 12GeV accelerator upgrade project, Hall B requires two conduction cooled superconducting magnets. One is a magnet system consisting of six superconducting trapezoidal racetrack-type coils assembled in a toroidal configuration and the second is an actively shielded solenoidal magnet system consisting of 5 coils. Both magnets are to be wound with Superconducting Super Collider-36 NbTi strand Rutherford cable soldered into a copper channel. This paper describes the various failure modes in torus magnet along with the failure modes that could be experienced by the torus and its interaction with the solenoid which is located inmore » close proximity.« less

  11. The Role of Grammar and the Teaching of Writing. Learning Package No. 39.

    ERIC Educational Resources Information Center

    Collins, Norma, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on the role of grammar and the teaching of writing is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC…

  12. New Phone System Coming to NCI Campus at Frederick | Poster

    Cancer.gov

    By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current

  13. Useful Life Prediction for Payload Carrier Hardware

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2002-01-01

    The Space Shuttle has been identified for use through 2020. Payload carrier systems will be needed to support missions through the same time frame. To support the future decision making process with reliable systems, it is necessary to analyze design integrity, identify possible sources of undesirable risk and recognize required upgrades for carrier systems. This project analyzed the information available regarding the carriers and developed the probability of becoming obsolete under different scenarios. In addition, this project resulted in a plan for an improved information system that will improve monitoring and control of the various carriers. The information collected throughout this project is presented in this report as process flow, historical records, and statistical analysis.

  14. Use of failure modes and effects analysis in design of the tracker system for the HET wide-field upgrade

    NASA Astrophysics Data System (ADS)

    Hayes, Richard; Beets, Tim; Beno, Joseph; Booth, John; Cornell, Mark; Good, John; Heisler, James; Hill, Gary; Kriel, Herman; Penney, Charles; Rafal, Marc; Savage, Richard; Soukup, Ian; Worthington, Michael; Zierer, Joseph

    2012-09-01

    In support of the Hobby-Eberly Telescope Dark Energy Experiment (HETDEX), the Center for Electromechanics at The University of Texas at Austin was tasked with developing the new Tracker and control system to support the HETDEX Wide-Field Upgrade. The tracker carries the 3,100 kg Prime Focus Instrument Package and Wide Field Corrector approximately 13 m above the 10 m diameter primary mirror. Its safe and reliable operation by a sophisticated control system, over a 20 year life time is a paramount requirement for the project. To account for all potential failures and potential hazards, to both the equipment and personnel involved, an extensive Failure Modes and Effects Analysis (FMEA) was completed early in the project. This task required participation of all the stakeholders over a multi-day meeting with numerous follow up exchanges. The event drove a number of significant design decisions and requirements that might not have been identified this early in the project without this process. The result is a system that has multiple layers of active and passive safety systems to protect the tens of millions of dollars of hardware involved and the people who operate it. This paper will describe the background of the FMEA process, how it was utilized on HETDEX, the critical outcomes, how the required safety systems were implemented, and how they have worked in operation. It should be of interest to engineers, designers, and managers engaging in complex multi-disciplinary and parallel engineering projects that involve automated hardware and control systems with potentially hazardous operating scenarios.

  15. The Role of Educational Technology in Upgrading Teacher Education in Pakistan.

    ERIC Educational Resources Information Center

    Abbasi, M. Hashim; Millar, Alex C.

    This paper outlines a joint Asian Bank/Pakistan Ministry of Education project designed to upgrade the state of teacher education and to improve the quality, status, and professional self-esteem of Pakistan's teachers. The main strategies identified by the Project for priority attention include: structural changes through the creation of four new…

  16. MWPC prototyping and testing for STAR inner TPC upgrade

    NASA Astrophysics Data System (ADS)

    Shen, F.; Wang, S.; Yang, C.; Xu, Q.

    2017-06-01

    STAR experiment at the Relativistic Heavy Ion Collider (RHIC) is upgrading the inner sectors of the Time Projection Chamber (iTPC). The iTPC upgrade project will increase the segmentation on the inner pad plane from 13 to 40 pad rows and renew the inner sector wire chambers. The upgrade will expand the TPC's acceptance from |η|<=1.0 to |η|<=1.5. Furthermore, the detector will have better acceptance for tracks with low momentum, as well as better resolution in both momentum and dE/dx for tracks of all momenta. The enhanced measurement capabilities of STAR-iTPC upgrade are crucial to the physics program of the Phase II of Beam Energy Scan (BES-II) at RHIC during 2019-2020, in particular the QCD phase transition study. In this proceedings, I will discuss the iTPC MWPC module fabrication and testing results from the first full size iTPC MWPC pre-prototype made at Shandong University.

  17. MicroTCA-based Global Trigger Upgrade project for the CMS experiment at LHC

    NASA Astrophysics Data System (ADS)

    Rahbaran, B.; Arnold, B.; Bergauer, H.; Eichberger, M.; Rabady, D.

    2011-12-01

    The electronics of the first Level Global Trigger (GT) of CMS is the last stage of the Level-1 trigger system [1]. At LHC up to 40 million collisions of proton bunches occur every second, resulting in about 800 million proton collisions. The CMS Level-1 Global Trigger [1], a custom designed electronics system based on FPGA technology and the VMEbus system, performs a quick on-line analysis of each collision every 25 ns and decides whether to reject or to accept it for further analysis. The CMS trigger group of the Institute of High Energy Physics in Vienna (HEPHY) is involved in the Level-1 trigger of the CMS experiment at CERN. As part of the Trigger Upgrade, the Level-1 Global Trigger will be redesigned and implemented in MicroTCA based technology, which allows engineers to detect all possible faults on plug-in boards, in the power supply and in the cooling system. The upgraded Global Trigger will be designed to have the same basic categories of functions as the present GT, but will have more algorithms and more possibilities for combining trigger candidates. Additionally, reconfigurability and testability will be supported based on the next system generation.

  18. 7 CFR 274.1 - Issuance system approval standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...

  19. 7 CFR 274.1 - Issuance system approval standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...

  20. 7 CFR 274.1 - Issuance system approval standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...

  1. 7 CFR 274.1 - Issuance system approval standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... computer database and electronically accessed by households at the point of sale via reusable plastic cards... submission of advance planning documents (APDs). (1) Pilot project approval requirements. To the extent the State is moving EBT to new technology or incorporating enhancements or upgrades that significantly...

  2. The new Inner Tracking System of the ALICE experiment

    NASA Astrophysics Data System (ADS)

    Martinengo, P.; Alice Collaboration

    2017-11-01

    The ALICE experiment will undergo a major upgrade during the next LHC Long Shutdown scheduled in 2019-20 that will enable a detailed study of the properties of the QGP, exploiting the increased Pb-Pb luminosity expected during Run 3 and Run 4. The replacement of the existing Inner Tracking System with a completely new ultra-light, high-resolution detector is one of the cornerstones within this upgrade program. The main motivation of the ITS upgrade is to provide ALICE with an improved tracking capability and impact parameter resolution at very low transverse momentum, as well as to enable a substantial increase of the readout rate. The new ITS will consist of seven layers of innovative Monolithic Active Pixel Sensors with the innermost layer sitting at only 23 mm from the interaction point. This talk will focus on the design and the physics performance of the new ITS, as well as the technology choices adopted. The status of the project and the results from the prototypes characterization will also be presented.

  3. New beam-position monitor system for upgraded Photon Factory storage ring.

    PubMed

    Haga, K; Honda, T; Tadano, M; Obina, T; Kasuga, T

    1998-05-01

    Accompanying the brilliance-upgrading project at the Photon Factory storage ring, the beam-position monitor (BPM) system has been renovated. The new system was designed to enable precise and fast measurements to correct the closed-orbit distortion (COD), as well as to feed back the orbit position during user runs. There are 42 BPMs newly installed, amounting to a total of 65 BPMs. All of the BPMs are calibrated on the test bench using a coaxially strung metallic wire. The measured electrical offsets are typically 200 micro m in both directions, which is 1/2-1/3 of those of the old-type BPMs. In the signal-processing system, PIN diode switches are employed in order to improve reliability. In the fastest mode, this system is capable of measuring COD within about 10 ms; this fast acquisition will allow fast suppression of the beam movement for frequencies up to 50 Hz using a global feedback system.

  4. Upgrade project and plans for the ATLAS detector and trigger

    NASA Astrophysics Data System (ADS)

    Pastore, Francesca; Atlas Collaboration

    2013-08-01

    The LHC is expected to under go upgrades over the coming years in order to extend its scientific potential. Through two different phases (namely Phase-I and Phase-II), the average luminosity will be increased by a factor 5-10 above the design luminosity, 1034 cm-2 s-1. Consequently, the LHC experiments will need upgraded detectors and new infrastructure of the trigger and DAQ systems, to take into account the increase of radiation level and of particle rates foreseen at such high luminosity. In this paper we describe the planned changes and the investigations for the ATLAS experiment, focusing on the requirements for the trigger system to handle the increase rate of collisions per beam crossing, while maintaining widely inclusive selections. In different steps, the trigger detectors will improve their selectivity by benefiting from increased granularity. To improve the flexibility of the system, the use of the tracking information in the lower levels of the trigger selection is also discussed. Lastly different scenarios are compared, based on the expected physics potential of ATLAS in this high luminosity regime.

  5. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  6. Development of an Integrated, Computer-Based, Bibliographical Data System for a Large University Library. Annual Report to the National Science Foundation from the University of Chicago Library, 1967-68.

    ERIC Educational Resources Information Center

    Fussler, Herman H.; Payne, Charles T.

    The project's second year (1967/68) was devoted to upgrading the computer operating software and programs to increase versatility and reliability. General conclusions about the program after 24 months of operation are that the project's objectives are sound and that effective utilization of computer-aided bibliographic data processing is essential…

  7. Waves at Navigation Structures

    DTIC Science & Technology

    2015-10-30

    upgrades the Coastal Modeling System (CMS) wave models CMS-Wave, a phase- averaged spectral wave model, and BOUSS-2D, a Boussinesq type nonlinear wave...developing WaveNet and TideNet, two Web-based tool systems for wind and wave data access and processing, which provide critical data for USACE project...practical applications, resulting in optimization of navigation system to improve safety, reliability and operations with innovative infrastructures

  8. Performance of the prototype LaBr3 spectrometer developed for the JET gamma-ray camera upgrade.

    PubMed

    Rigamonti, D; Muraro, A; Nocente, M; Perseo, V; Boltruczyk, G; Fernandes, A; Figueiredo, J; Giacomelli, L; Gorini, G; Gosk, M; Kiptily, V; Korolczuk, S; Mianowski, S; Murari, A; Pereira, R C; Cippo, E P; Zychor, I; Tardocchi, M

    2016-11-01

    In this work, we describe the solution developed by the gamma ray camera upgrade enhancement project to improve the spectroscopic properties of the existing JET γ-ray camera. Aim of the project is to enable gamma-ray spectroscopy in JET deuterium-tritium plasmas. A dedicated pilot spectrometer based on a LaBr 3 crystal coupled to a silicon photo-multiplier has been developed. A proper pole zero cancellation network able to shorten the output signal to a length of 120 ns has been implemented allowing for spectroscopy at MHz count rates. The system has been characterized in the laboratory and shows an energy resolution of 5.5% at E γ = 0.662 MeV, which extrapolates favorably in the energy range of interest for gamma-ray emission from fast ions in fusion plasmas.

  9. FY17 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Appel, Gordon John; Hadgu, Teklu; Appel, Gordon John

    Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) weremore » used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA- type analysis on the server cluster. The current tasks included preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 12.0 and address DLL-related issues observed in the FY16 work. The model upgrade task successfully converted the Nominal Modeling case to GoldSim Versions 11.1/12. Conversions of the rest of the TSPA models were also attempted but program and operational difficulties precluded this. Upgrade of the remaining of the modeling cases and distributed processing tasks is expected to continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.« less

  10. Recent developments for the upgrade of the LHCb readout system

    NASA Astrophysics Data System (ADS)

    Cachemiche, J. P.; Y Duval, P.; Hachon, F.; Le Gac, R.; Réthoré, F.

    2013-02-01

    The upgraded LHCb readout system aims at a trigger-free readout of the entire detector at the bunch-crossing rate. This implies a major architectural change for the readout system that must capture the data at 40 MHz instead of 1 MHz. One of the key components of this upgrade system is the readout board. The LHCb collaboration has chosen to evaluate the ATCA architecture as form-factor for the readout board. The readout system architecture relies on a unique board able to satisfy all the requirements for data transmission, timing and fast control as well as experiment control system. A generic ATCA carrier board has been developped. It is equipped with four dense AMC mezzanines able to interface a total of 144 bidirectional optical links at up to 10 Gbits/s. This board embeds 4 high end Stratix V GX devices for data processing and a programmable set of commutation functions allowing to reconfigure the connectivity of the system in a flexible way. The overall architecture will be presented and how the cards map over each functionality. First results and measurements will be described in particular those related to the use of new highly integrated optical devices. At last we will present the incremental development methodology used in this project.

  11. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... high-voltage transmission system carries electricity from 57 power plants encompassing 14 multi-purpose... DEPARTMENT OF ENERGY Southwestern Power Administration Western Area Power Administration Request... Act of 2005 AGENCY: Southwestern Power Administration and Western Area Power Administration...

  12. A case study : Chart II software upgrade, using a design competition to procure ITS software

    DOT National Transportation Integrated Search

    2000-03-01

    This is one of a series of case studies that examine procurement approaches used to deliver Intelligent Transportation System (ITS) projects. The purpose of these reports is to provide examples of successful strategies that have been used to overcome...

  13. RBDMS, FracFocus, and Gateway Initiatives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yates, Dan

    Award DE-FE-0000880 from the Department of Energy to the Ground Water Protection Council (GWPC) focuses on state and federal priorities in the areas of state RBDMS development, connectivity between state systems and FracFocus.org, and data sharing initiatives across agencies. The overarching goals of these projects are to: - upgrade the Risk Based Data Management System (RBDMS) to a web based application; - upgrade the RBDMS user interface to make it more intuitive and easier to use - increase connectivity between state RBDMS systems and FracFocus; - provide outreach to states and agencies through training programs, special meetings, and state bymore » state outreach on all deliverables; - provide greater functionality for non-IT users; - update and install RBDMS modules in additional state programs (IL, CA, WY, WV); and; - help make data access more transparent. The primary objective is to enhance the Risk Based Data Management System (RBDMS) by adding new components relevant to current environmental topics such as hydraulic fracturing, increasing field inspection capabilities, creating linkages between FracFocus and state programs, upgrading eForm capabilities, and analyzing potential for data sharing. The GWPC will work with state agencies to develop an RBDMS module(s) that meets these needs.« less

  14. Advanced coal conversion process demonstration. Technical progress report for the period July 1, 1995--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from July 1, 1995 through September 30, 1995. The ACCP Demonstration Project is a US Department of Energy (DOE) Clean Coal Technology Project. This project demonstrates an advanced, thermal, coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, andmore » volatile sulfur compounds. After thermal upgrading, the cola is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal.« less

  15. Performance of the upgraded Orroral laser ranging system

    NASA Technical Reports Server (NTRS)

    Luck, John M.

    1993-01-01

    The topics discussed include the following: upgrade arrangements, system prior to 1991, elements of the upgrade, laser performance, timing system performance, pass productivity, system precision, system accuracy, telescope pointing and future upgrades and extensions.

  16. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    A new project was initiated this quarter to develop gas/liquid membranes for natural gas upgrading. Efforts have concentrated on legal agreements, including alternative field sites. Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbingmore » liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting in equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project.« less

  17. Advanced gas turbines breathe new life into vintage reheat units

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This article describes the repowering of reheat units with advanced gas turbines. The topics of the article include a project overview, plant configuration including heat recovery steam generators and the plant-wide distributed control system, upgrade of existing steam turbines, gas turbine technology, reliability, availability, maintenance features, and training.

  18. Student Support that Works: A Solid Approach.

    ERIC Educational Resources Information Center

    Lang, Kathy J.; Bielejeski, Ruth

    The College of Saint Benedict and Saint John's University (Minnesota), two coordinate, liberal arts colleges, have implemented a cost-effective student information technology (IT) support system. Project IMPACT (Implementing Academic Technology), a 5-year, $10 million plan to upgrade the technology for student and faculty use, was implemented in…

  19. Processes and Planning Structure Required for Implementing a Collegewide Area Network.

    ERIC Educational Resources Information Center

    Lapenta, Susan; Lutz, Todd

    Since 1984, Arizona's Mohave Community College (MCC) has implemented innovative educational technology to better serve students, including an instructional television system to serve remote locations and a distance learning program. In 1993, the college initiated a project to upgrade its technological capabilities through the establishment of a…

  20. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema

    Gibbson, Murray

    2018-03-02

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  1. AFRL Advanced Electric Lasers Branch - Construction and Upgrade of a 50-watt Facility-Class Sodium Guidestar Pump Laser

    NASA Astrophysics Data System (ADS)

    Bronder, T.; Miller, H.; Stohs, J.; Lu, C.; Baker, J.; Lucero, A.

    The development of a reliable and effective laser source for pumping mesospheric sodium to generate an artificial guidestar has been well documented. From the early achievements with 589nm high-power dye lasers at the Keck and Lick observatories to the ground-breaking 50W CW FASOR (Frequency Addition Source of Optical Radiation) Guidestar at the Air Forces Starfire Optical Range (SOR), there has been intense interest in this technology from both the academic and military communities. Beginning in the fall of 2008, the Air Force Research Laboratorys Advanced Electric Lasers Branch began a project to build, test, verify and deliver an upgraded version of the SOR FASOR for use at the AF Maui Optical Station (AMOS) in the summer of 2010. This FASOR will be similar in design to the existing SOR device and produce 50W of diffraction limited, linearly polarized narrow linewidth 589nm light by combining the output of two injection-locked Nd:YAG ring lasers (operating at 1064nm and 1319nm) using resonant sum-frequency generation in a lithium triborate crystal (LBO). The upgraded features will include modularized sub-components, embedded control electronics, and a simplified cooling system. The first portion of this upgrade project is to reconstruct the current SOR FASOR components and include improved methods of regulating the gain modules of the two injection lasers. In parallel with this effort, the technical plans for the modularization and re-packaging of the FASOR will be finalized and coordinated with the staff at Maui. This presentation will summarize the result of these efforts to date and provide updates on the AMOS FASOR status. Additionally, plans for "next-generation" FASOR upgrades for both SOR and AMOS will also be discussed.

  2. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  3. Performance of the prototype LaBr{sub 3} spectrometer developed for the JET gamma-ray camera upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigamonti, D., E-mail: davide.rigamonti@mib.infn.it; Nocente, M.; Gorini, G.

    2016-11-15

    In this work, we describe the solution developed by the gamma ray camera upgrade enhancement project to improve the spectroscopic properties of the existing JET γ-ray camera. Aim of the project is to enable gamma-ray spectroscopy in JET deuterium-tritium plasmas. A dedicated pilot spectrometer based on a LaBr{sub 3} crystal coupled to a silicon photo-multiplier has been developed. A proper pole zero cancellation network able to shorten the output signal to a length of 120 ns has been implemented allowing for spectroscopy at MHz count rates. The system has been characterized in the laboratory and shows an energy resolution ofmore » 5.5% at E{sub γ} = 0.662 MeV, which extrapolates favorably in the energy range of interest for gamma-ray emission from fast ions in fusion plasmas.« less

  4. Bitumen and heavy oil upgrading in Canada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chrones, J.; Germain, R.R.

    1989-01-01

    A review is presented of the heavy oil upgrading industry in Canada. Up to now it has been based on the processing of bitumen extracted from oil sands mining operations at two sites, to produce a residue-free, low sulphur, synthetic crude. Carbon rejection has been the prime process technology with delayed coking being used by Suncor and FLUID COKING at Syncrude. Alternative processes for recovering greater amounts of synthetic crude are examined. These include a variety of hydrogen addition processes and combinations which produce pipelineable materials requiring further processing in downstream refineries with expanded capabilities. The Newgrade Energy Inc. upgradermore » now under construction in Regina, will use fixed-bed, catalytic, atmospheric-residue, hydrogen processing. Two additional projects, also based on hydrogenation, will use ebullated bed catalyst systems; the expansion of Syncrude, now underway, is using the LC Fining Process whereas the announced Husky Bi-Provincial upgrader is based on H-Oil.« less

  5. Underground structure pattern and multi AO reaction with step feed concept for upgrading an large wastewater treatment plant

    NASA Astrophysics Data System (ADS)

    Peng, Yi; Zhang, Jie; Li, Dong

    2018-03-01

    A large wastewater treatment plant (WWTP) could not meet the new demand of urban environment and the need of reclaimed water in China, using a US treatment technology. Thus a multi AO reaction process (Anaerobic/oxic/anoxic/oxic/anoxic/oxic) WWTP with underground structure was proposed to carry out the upgrade project. Four main new technologies were applied: (1) multi AO reaction with step feed technology; (2) deodorization; (3) new energy-saving technology such as water resource heat pump and optical fiber lighting system; (4) dependable old WWTP’s water quality support measurement during new WWTP’s construction. After construction, upgrading WWTP had saved two thirds land occupation, increased 80% treatment capacity and improved effluent standard by more than two times. Moreover, it had become a benchmark of an ecological negative capital changing to a positive capital.

  6. Evaluation of Child Care Subsidy Strategies: Implementation of Three Language and Literacy Interventions in Project Upgrade. OPRE 2011-4

    ERIC Educational Resources Information Center

    Layzer, Carolyn J.; Layzer, Jean I.; Wolf, Anne

    2010-01-01

    This report describes the design and implementation of the three interventions tested in Project Upgrade, one of four experiments conducted as part of the Evaluation of Child Care Subsidy Strategies. The evaluation was a multi-site, multi-year effort to determine whether and how different child care subsidy policies and procedures and quality…

  7. New Phone System Coming to NCI Campus at Frederick | Poster

    Cancer.gov

    By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current Avaya phone system with a Cisco Unified Communications phone system. The Cisco system is already in use at the Advanced Technology Research Facility (ATRF).

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    When the facilities design and construction team at the University of California, San Diego (UCSD) started planning to upgrade and expand their control system, they had several critical goals for the project. They wanted a building automation system (BAS) that could achieve optimum energy savings while maximizing the efficiency of the facilities staff. They needed the new system to link 26 campus buildings--containing a variety of existing systems--to one central location for monitoring and diagnostics. They wanted a single vendor to handle installation, software development, service and support--and they wanted the entire project completed without downtime. At the core ofmore » these technologies is the Metasys{reg_sign} facility management system from Johnson Controls.« less

  9. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-03

    The Hubble Space Telescope (HST), with its normal routine temporarily interrupted, is about to be captured by the Space Shuttle Columbia prior to a week of servicing and upgrading by the STS-109 crew. The telescope was captured by the shuttle's Remote Manipulator System (RMS) robotic arm and secured on a work stand in Columbia's payload bay where 4 of the 7-member crew performed 5 space walks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. Launched March 1, 2002, the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  10. Recovery Act. Tapoco project. Cheoah upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tran, Paul

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  11. Command, Control, Communications and Intelligence (C3I) Project Book: Fiscal Year 1992

    DTIC Science & Technology

    1992-05-12

    PSC-3 is a rugged, lightweight (less than 35 lbs including batteries and whip and mdium gain antennas) portable device capable of being paged while...as Materiel Change (NC) projects. They Include: TACFWR Wpgade NC; Water Entry Resolution NC; FIREFIWER Training Device Upgrade MC; and Backplmn Wiringj... devices consist of a sensor . processor addigital display ibplWsd on an Individual air defense mopon system(FAM and NWWI). Two models are in development

  12. Motherhood: making it safer for Filipino women.

    PubMed

    Baylon, M C

    1996-01-01

    In November 1995, in the Philippines, the Department of Health implemented the Women's Health and Safe Motherhood Project. Its target audience is poor women in remote and underserved provinces. It addresses maternal health, reproductive tract infections (RTIs), sexually transmitted diseases (STDs), cervical cancer, domestic violence, and the desire to space births. It aims to improve the quality of women's health services through training of health providers, providing women with information to help them make informed choices, providing regular supplies and drugs, privacy and infection control at service delivery points, providing follow-up care, and improved cost-effective and technically-sound referral systems. The project also aims to ensure accessible service delivery points, well-equipped and maintained facilities, client and community feedback in managing service delivery, and information provision in order to increase acceptability of health services. The major components of the project include service delivery, institutional strengthening (via information, education, and communication; training of health providers; and improvement of the logistics system), community partnership for women's health development, and policy and operations research. The service delivery component will adopt a life-cycle approach to service delivery in Region 8 (urban and rural communities). It will pilot the syndromic approach in the management and detection of RTIs and STDs in 10 provinces. The biggest tasks of the project are upgrading referral networks from provincial and district hospitals to rural health units and barangay health stations and upgrading primary hospitals.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hasegawa, S.

    The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/2017. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line associated with trigger rate increases. This effect is duemore » to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was confirmed at the expected detector operation temperature ($-$20 °C).« less

  14. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-08

    After five days of service and upgrade work on the Hubble Space Telescope (HST), the STS-109 crew photographed the giant telescope in the shuttle's cargo bay. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where 4 of the 7-member crew performed 5 space walks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. Launched March 1, 2002, the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  15. What Facilitates and Impedes Collaborative Work during Higher Education Software Implementation Projects?

    ERIC Educational Resources Information Center

    Cramer, Sharon F.; Tetewsky, Sheldon J.; Marczynski, Kelly S.

    2010-01-01

    Implementations of new or major upgrades of existing student information systems require incorporation of new paradigms and the exchange of familiar routines for new methods. As a result, implementations are almost always time consuming and expensive. Many people in the field of information technology have identified some of the challenges faced…

  16. Experiment Needs and Facilities Study Appendix A Transient Reactor Test Facility (TREAT) Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The TREAT Upgrade effort is designed to provide significant new capabilities to satisfy experiment requirements associated with key LMFBR Safety Issues. The upgrade consists of reactor-core modifications to supply the physics performance needed for the new experiments, an Advanced TREAT loop with size and thermal-hydraulics capabilities needed for the experiments, associated interface equipment for loop operations and handling, and facility modifications necessary to accommodate operations with the Loop. The costs and schedules of the tasks to be accomplished under the TREAT Upgrade project are summarized. Cost, including contingency, is about 10 million dollars (1976 dollars). A schedule for execution ofmore » 36 months has been established to provide the new capabilities in order to provide timely support of the LMFBR national effort. A key requirement for the facility modifications is that the reactor availability will not be interrupted for more than 12 weeks during the upgrade. The Advanced TREAT loop is the prototype for the STF small-bundle package loop. Modified TREAT fuel elements contain segments of graphite-matrix fuel with graded uranium loadings similar to those of STF. In addition, the TREAT upgrade provides for use of STF-like stainless steel-UO{sub 2} TREAT fuel for tests of fully enriched fuel bundles. This report will introduce the Upgrade study by presenting a brief description of the scope, performance capability, safety considerations, cost schedule, and development requirements. This work is followed by a "Design Description". Because greatly upgraded loop performance is central to the upgrade, a description is given of Advanced TREAT loop requirements prior to description of the loop concept. Performance requirements of the upgraded reactor system are given. An extensive discussion of the reactor physics calculations performed for the Upgrade concept study is provided. Adequate physics performance is essential for performance of experiments with the Advanced TREAT loop, and the stress placed on these calculations reflects this. Additional material on performance and safety is provided. Backup calculations on calculations of plutonium-release limits are described. Cost and schedule information for the Upgrade are presented.« less

  17. Upgrading the Underemployed in the Work Environment: Volume 1 through 4 and Summary of the 4-Volume Report. Final Report.

    ERIC Educational Resources Information Center

    Skill Achievement Inst., Lake Success, NY.

    This is a report on 18 months of work done in an experimental and demonstration project designed to develop ways to meet in-plant skill needs by upgrading the job skills of entry level (mostly minority group) workers and by improving capacity for better employee-supervisor relationships. Project activity took place in three cities--Newark,…

  18. TCS and peripheral robotization and upgrade on the ESO 1-meter telescope at La Silla Observatory

    NASA Astrophysics Data System (ADS)

    Ropert, S.; Suc, V.; Jordán, A.; Tala, M.; Liedtke, P.; Royo, S.

    2016-07-01

    In this work we describe the robotization and upgrade of the ESO 1m telescope located at La Silla Observatory. The ESO 1m telescope was the first telescope installed in La Silla, in 1966. It now hosts as a main instrument the FIber Dual EchellE Optical Spectrograph (FIDEOS), a high resolution spectrograph designed for precise Radial Velocity (RV) measurements on bright stars. In order to meet this project's requirements, the Telescope Control System (TCS) and some of its mechanical peripherals needed to be upgraded. The TCS was also upgraded into a modern and robust software running on a group of single board computers interacting together as a network with the CoolObs TCS developed by ObsTech. One of the particularities of the CoolObs TCS is that it allows to fuse the input signals of 2 encoders per axis in order to achieve high precision and resolution of the tracking with moderate cost encoders. One encoder is installed on axis at the telescope and the other on axis at the motor. The TCS was also integrated with the FIDEOS instrument system so that all the system can be controlled through the same remote user interface. Our modern TCS unit allows the user to run observations remotely through a secured internet web interface, minimizing the need of an on-site observer and opening a new age in robotic astronomy for the ESO 1m telescope.

  19. Status of the ATF Damping Ring BPM Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Briegel, C.; /Fermilab; Eddy, N.

    2011-12-01

    A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it'smore » finalization are presented.« less

  20. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    NASA Technical Reports Server (NTRS)

    Marsh, Angela L.; Dudley, Stephanie R. B.

    2014-01-01

    With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

  1. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dentz, Jordan; Henderson, Hugh

    2012-04-01

    The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit’s housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected to reduce heating costs by 15% to 25%.

  2. “Exploring High Energy Interactions with CMS at the LHC”

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sulak, Lawrence R.

    2016-08-01

    This High Energy Physics research project achieved its goal of exploring high-energy interactions with 7, 8 and 13 TeV data accumulated by CMS at the Energy Frontier. For the original hadron calorimeter (HCAL) and for its upgrade during Long Shutdown 1 (LS1), the PI helped propose and implement the upgrading the phototubes, new electronics, and fast timing of the hadronic forward (HF) and hadronic outer (HO) calorimeters of CMS, projects which he had forcefully advocated since the inception of CMS. The PI and his colleagues Prof. J. Rohlf and chief electronics engineer E. Hazen, his post-docs A. Heister and S.more » Girgis, and his graduate students (P. Lawson and D. Arcaro) contributed software tools used in perfecting of μTCA and Advanced Mezzanine Card (AMC13) electronics, the PC board that provides clock, timing and DAQ service for HCAL (and now many other subdetectors and central systems in the upgraded CMS detector). This Task reaped the benefits of these hardware contributions 1) to hermiticity for missing energy searches, and 2) to forward tagging jets for Vector Boson Fusion processes by analyzing and publishing early data, including that for the Higgs discovery and for exotic and supersymmetric searches.« less

  3. Prostate Upgrading Team Project — EDRN Public Portal

    Cancer.gov

    Aim 1: We will develop a risk assessment tool using commonly-collected clinical information from a series of contemporary radical prostatectomies to predict the risk of prostate cancer upgrading to high grade cancer at radical prostatectomy. These data will be combined as a part of our Early Detection Research Network (EDRN) GU Working Group into a risk assessment tool; this tool will be named the EDRN Prostatectomy Upgrading Calculator or (EPUC).

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadgu, Teklu; Appel, Gordon John

    Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the currentmore » analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.« less

  5. Upgrades to the Polarized Neutron Reflectometer Asterix at LANSCE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pynn, Roger

    2015-03-16

    We have upgraded the polarized neutron reflectometer, Asterix, at the Lujan Neutron Scattering Center at Los Alamos for the benefit of the research communities that study magnetic and complex-fluid films, both of which play important roles in support of the DOE’s energy mission. The upgrades to the instrument include: • A secondary spectrometer that was integrated with a Huber sample goniometer purchased with other funds just prior to the start of our project. The secondary spectrometer provides a flexible length for the scattered flight path, includes a mechanism to select among 3 alternative polarization analyzers as well as a supportmore » for new neutron detectors. Also included is an optic rail for reproducible positioning of components for Spin Echo Scattering Angle Measurement (SESAME). The entire secondary spectrometer is now non-magnetic, as required for neutron Larmor labeling. • A broad-band neutron polarizer for the incident neutron beam based on the V geometry. • A wide-angle neutron polarization analyzer • A 2d position-sensitive neutron detector • Electromagnetic coils (Wollaston prisms) for SESAME plus the associated power supplies, cooling, safety systems and integration into the data acquisition system. The upgrades allowed a nearly effortless transition between configurations required to serve the polarized neutron reflectometry community, users of the 11 T cryomagnet and users of SESAME.« less

  6. Design of an AdvancedTCA board management controller (IPMC)

    NASA Astrophysics Data System (ADS)

    Mendez, J.; Bobillier, V.; Haas, S.; Joos, M.; Mico, S.; Vasey, F.

    2017-03-01

    The AdvancedTCA (ATCA) standard has been selected as the hardware platform for the upgrade of the back-end electronics of the CMS and ATLAS experiments of the Large Hadron Collider (LHC) . In this context, the electronic systems for experiments group at CERN is running a project to evaluate, specify, design and support xTCA equipment. As part of this project, an Intelligent Platform Management Controller (IPMC) for ATCA blades, based on a commercial solution, has been designed to be used on existing and future ATCA blades. This paper reports on the status of this project presenting the hardware and software developments.

  7. Model for Evaluating the Cost Consequences of Deferring New System Acquisition Through Upgrades

    DTIC Science & Technology

    1999-07-01

    Analysis & Evaluation The Pentagon Washington, DC 20301 Attn: Mr. Eric Coulter, Director Projection Forces Division, Room 2E314 Lt Col Kathleen Conley...1034 Office of the Air National Guard ANG/AQM 5109 Leesburg Pike Skyline VI, Suite 302A Falls Church, VA 22041-3201 Attn: Col Brent Marler 1 Lt Col

  8. Performance of AESP Transmission/Reception Equipment; Summer and Fall, 1974 Technical Report No. 5.

    ERIC Educational Resources Information Center

    Bramble, William J.; And Others

    Appalachian Education Satellite Project (AESP), using the ATS-6 satellite, has designed a variety of multi-media learning activities intended to upgrade the quality of instruction in Appalachia. Four modes of communication (televised programs, four-channel audio review, four-channel data collection and analysis, and VHF-teletype relay system) were…

  9. Advanced Engineering Environment FY09/10 pilot project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporatemore » product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, K.; Chen, H.; Wu, W.

    We present that in the upgrade of ATLAS experiment, the front-end electronics components are subjected to a large radiation background. Meanwhile high speed optical links are required for the data transmission between the on-detector and off-detector electronics. The GBT architecture and the Versatile Link (VL) project are designed by CERN to support the 4.8 Gbps line rate bidirectional high-speed data transmission which is called GBT link. In the ATLAS upgrade, besides the link with on-detector, the GBT link is also used between different off-detector systems. The GBTX ASIC is designed for the on-detector front-end, correspondingly for the off-detector electronics, themore » GBT architecture is implemented in Field Programmable Gate Arrays (FPGA). CERN launches the GBT-FPGA project to provide examples in different types of FPGA. In the ATLAS upgrade framework, the Front-End LInk eXchange (FELIX) system is used to interface the front end electronics of several ATLAS subsystems. The GBT link is used between them, to transfer the detector data and the timing, trigger, control and monitoring information. The trigger signal distributed in the down-link from FELIX to the front-end requires a fixed and low latency. In this paper, several optimizations on the GBT-FPGA IP core are introduced, to achieve a lower fixed latency. For FELIX, a common firmware will be used to interface different front-ends with support of both GBT modes: the forward error correction mode and the wide mode. The modified GBT-FPGA core has the ability to switch between the GBT modes without FPGA reprogramming. Finally, the system clock distribution of the multi-channel FELIX firmware is also discussed in this paper.« less

  11. Optimization on fixed low latency implementation of the GBT core in FPGA

    DOE PAGES

    Chen, K.; Chen, H.; Wu, W.; ...

    2017-07-11

    We present that in the upgrade of ATLAS experiment, the front-end electronics components are subjected to a large radiation background. Meanwhile high speed optical links are required for the data transmission between the on-detector and off-detector electronics. The GBT architecture and the Versatile Link (VL) project are designed by CERN to support the 4.8 Gbps line rate bidirectional high-speed data transmission which is called GBT link. In the ATLAS upgrade, besides the link with on-detector, the GBT link is also used between different off-detector systems. The GBTX ASIC is designed for the on-detector front-end, correspondingly for the off-detector electronics, themore » GBT architecture is implemented in Field Programmable Gate Arrays (FPGA). CERN launches the GBT-FPGA project to provide examples in different types of FPGA. In the ATLAS upgrade framework, the Front-End LInk eXchange (FELIX) system is used to interface the front end electronics of several ATLAS subsystems. The GBT link is used between them, to transfer the detector data and the timing, trigger, control and monitoring information. The trigger signal distributed in the down-link from FELIX to the front-end requires a fixed and low latency. In this paper, several optimizations on the GBT-FPGA IP core are introduced, to achieve a lower fixed latency. For FELIX, a common firmware will be used to interface different front-ends with support of both GBT modes: the forward error correction mode and the wide mode. The modified GBT-FPGA core has the ability to switch between the GBT modes without FPGA reprogramming. Finally, the system clock distribution of the multi-channel FELIX firmware is also discussed in this paper.« less

  12. Optimization on fixed low latency implementation of the GBT core in FPGA

    NASA Astrophysics Data System (ADS)

    Chen, K.; Chen, H.; Wu, W.; Xu, H.; Yao, L.

    2017-07-01

    In the upgrade of ATLAS experiment [1], the front-end electronics components are subjected to a large radiation background. Meanwhile high speed optical links are required for the data transmission between the on-detector and off-detector electronics. The GBT architecture and the Versatile Link (VL) project are designed by CERN to support the 4.8 Gbps line rate bidirectional high-speed data transmission which is called GBT link [2]. In the ATLAS upgrade, besides the link with on-detector, the GBT link is also used between different off-detector systems. The GBTX ASIC is designed for the on-detector front-end, correspondingly for the off-detector electronics, the GBT architecture is implemented in Field Programmable Gate Arrays (FPGA). CERN launches the GBT-FPGA project to provide examples in different types of FPGA [3]. In the ATLAS upgrade framework, the Front-End LInk eXchange (FELIX) system [4, 5] is used to interface the front-end electronics of several ATLAS subsystems. The GBT link is used between them, to transfer the detector data and the timing, trigger, control and monitoring information. The trigger signal distributed in the down-link from FELIX to the front-end requires a fixed and low latency. In this paper, several optimizations on the GBT-FPGA IP core are introduced, to achieve a lower fixed latency. For FELIX, a common firmware will be used to interface different front-ends with support of both GBT modes: the forward error correction mode and the wide mode. The modified GBT-FPGA core has the ability to switch between the GBT modes without FPGA reprogramming. The system clock distribution of the multi-channel FELIX firmware is also discussed in this paper.

  13. Replacing the Engine In Your Car While You Are Still Driving It

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bjorklund, Eric A.

    Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with theirmore » own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.« less

  14. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings - Phase 1: Boiler Control Replacement and Monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dentz, J.; Henderson, H.

    2012-04-01

    The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit's housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected to reduce heating costs by 15 to 25 percent.

  15. Integrated modeling of high βN steady state scenario on DIII-D

    DOE PAGES

    Park, Jin Myung; Ferron, J. R.; Holcomb, Christopher T.; ...

    2018-01-10

    Theory-based integrated modeling validated against DIII-D experiments predicts that fully non-inductive DIII-D operation with β N > 4.5 is possible with certain upgrades. IPS-FASTRAN is a new iterative numerical procedure that integrates models of core transport, edge pedestal, equilibrium, stability, heating, and current drive self-consistently to find steady-state ( d/dt = 0) solutions and reproduces most features of DIII-D high β N discharges with a stationary current profile. Projecting forward to scenarios possible on DIII-D with future upgrades, the high q min > 2 scenario achieves stable operation at β N as high as 5 by using a very broadmore » current density profile to improve the ideal-wall stabilization of low- n instabilities along with confinement enhancement from low magnetic shear. This modeling guides the necessary upgrades of the heating and current drive system to realize reactor-relevant high β N steady-state scenarios on DIII-D by simultaneous optimization of the current and pressure profiles.« less

  16. Integrated modeling of high βN steady state scenario on DIII-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Jin Myung; Ferron, J. R.; Holcomb, Christopher T.

    Theory-based integrated modeling validated against DIII-D experiments predicts that fully non-inductive DIII-D operation with β N > 4.5 is possible with certain upgrades. IPS-FASTRAN is a new iterative numerical procedure that integrates models of core transport, edge pedestal, equilibrium, stability, heating, and current drive self-consistently to find steady-state ( d/dt = 0) solutions and reproduces most features of DIII-D high β N discharges with a stationary current profile. Projecting forward to scenarios possible on DIII-D with future upgrades, the high q min > 2 scenario achieves stable operation at β N as high as 5 by using a very broadmore » current density profile to improve the ideal-wall stabilization of low- n instabilities along with confinement enhancement from low magnetic shear. This modeling guides the necessary upgrades of the heating and current drive system to realize reactor-relevant high β N steady-state scenarios on DIII-D by simultaneous optimization of the current and pressure profiles.« less

  17. Integrated modeling of high βN steady state scenario on DIII-D

    NASA Astrophysics Data System (ADS)

    Park, J. M.; Ferron, J. R.; Holcomb, C. T.; Buttery, R. J.; Solomon, W. M.; Batchelor, D. B.; Elwasif, W.; Green, D. L.; Kim, K.; Meneghini, O.; Murakami, M.; Snyder, P. B.

    2018-01-01

    Theory-based integrated modeling validated against DIII-D experiments predicts that fully non-inductive DIII-D operation with βN > 4.5 is possible with certain upgrades. IPS-FASTRAN is a new iterative numerical procedure that integrates models of core transport, edge pedestal, equilibrium, stability, heating, and current drive self-consistently to find steady-state (d/dt = 0) solutions and reproduces most features of DIII-D high βN discharges with a stationary current profile. Projecting forward to scenarios possible on DIII-D with future upgrades, the high qmin > 2 scenario achieves stable operation at βN as high as 5 by using a very broad current density profile to improve the ideal-wall stabilization of low-n instabilities along with confinement enhancement from low magnetic shear. This modeling guides the necessary upgrades of the heating and current drive system to realize reactor-relevant high βN steady-state scenarios on DIII-D by simultaneous optimization of the current and pressure profiles.

  18. The payloads of Advanced Virgo: current status and upgrades

    NASA Astrophysics Data System (ADS)

    Naticchioni, L.; Virgo Collaboration

    2018-02-01

    The development and integration of new detector payloads has been an important part of the Advanced Virgo (AdV) project, the major upgrade of the Virgo interferometric detector of Gravitational Waves, aiming to increase the detector sensitivity by one order of magnitude. During the integration phase of the new AdV payloads with monolithic suspension of mirrors we experienced systematic suspension failures later identified as caused by dust contamination of the vacuum system. In order to not postpone the detector commissioning, making possible to join the LIGO O2 observation run, the Collaboration decided to proceed with the integration of the payloads relying on steel wire suspensions for all the mirrors. In this proceeding the status of the currently integrated payloads is reported, including their angular control characterization and the Q-factor measurements for test mass steel wire suspensions. The payload upgrade for the re-integration of monolithic suspensions after the O2 run is reported in the last section.

  19. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; Ronald Boring; Lew Hanes

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.« less

  20. Making the Business Case for Energy Savings Plus Health: Indoor Air Quality Guidelines for School Building Upgrades

    EPA Pesticide Factsheets

    The Energy Savings Plus Health Guide equips school districts to integrate indoor air quality protections into school energy efficiency retrofits and other building upgrade projects. This page describes the business case for energy savings in schools.

  1. Human Factors Engineering Aspects of Modifications in Control Room Modernization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hugo, Jacques; Clefton, Gordon; Joe, Jeffrey

    This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by variousmore » resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.« less

  2. NASA STI Program Coordinating Council Eleventh Meeting: NASA STI Modernization Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The theme of this NASA Scientific and Technical Information Program Coordinating Council Meeting was the modernization of the STI Program. Topics covered included the activities of the Engineering Review Board in the creation of the Infrastructure Upgrade Plan, the progress of the RECON Replacement Project, the use and status of Electronic SCAN (Selected Current Aerospace Notices), the Machine Translation Project, multimedia, electronic document interchange, the NASA Access Mechanism, computer network upgrades, and standards in the architectural effort.

  3. The Computer as an Aid to Reading Instruction. Learning Package No. 27.

    ERIC Educational Resources Information Center

    Simic, Marge, Comp.; Smith, Carl, Ed.

    Originally developed for the Department of Defense Schools (DoDDS) system, this learning package on computer use in reading is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture giving an overview on the…

  4. Quantitative Analysis of Defects in Silicon. Silicon Sheet Growth Development for the Large Area Silicon Sheet Task of the Low-cost Solar Array Project

    NASA Technical Reports Server (NTRS)

    Natesh, R.; Smith, J. M.; Qidwai, H. A.

    1979-01-01

    The various steps involved in the chemical polishing and etching of silicon samples are described. Data on twins, dislocation pits, and grain boundaries from thirty-one (31) silicon sample are also discussed. A brief review of the changes made to upgrade the image analysis system is included.

  5. Characterization of the Outer Barrel modules for the upgrade of the ALICE Inner Tracking System

    NASA Astrophysics Data System (ADS)

    Di Ruzza, B.

    2017-09-01

    ALICE is one of the four large detectors at the CERN LHC collider, designed to address the physics of strongly interacting matter, and in particular the properties of the Quark-Gluon Plasma using proton-proton, proton-nucleus, and nucleus-nucleus collisions. Despite the success already reached in achieving these physics goals, there are several measurements still to be finalized, like high precision measurements of rare probes (D mesons, Lambda baryons and B mesons decays) over a broad range of transverse momenta. In order to achieve these new physics goals, a wide upgrade plan was approved that combined with a significant increase of luminosity will enhance the ALICE physics capabilities enormously and will allow the achievement of these fundamental measurements. The Inner Tracking System (ITS) upgrade of the ALICE detector is one of the major improvements of the experimental set-up that will take place in 2019-2020 when the whole ITS sub-detector will be replaced with one realized using a innovative monolithic active pixel silicon sensor, called ALPIDE. The upgraded ITS will be realized using more than twenty-four thousand ALPIDE chips organized in seven different cylindrical layers, for a total surface of about ten square meters. The main features of the new ITS are a low material budget, high granularity and low power consumption. All these peculiar capabilities will allow for full reconstruction of rare heavy flavour decays and the achievement of the physics goals. In this paper after an overview of the whole ITS upgrade project, the construction procedure of the basic building block of the detector, namely the module, and its characterization in laboratory will be presented.

  6. Upgrading NASA/DOSE laser ranging system control computers

    NASA Technical Reports Server (NTRS)

    Ricklefs, Randall L.; Cheek, Jack; Seery, Paul J.; Emenheiser, Kenneth S.; Hanrahan, William P., III; Mcgarry, Jan F.

    1993-01-01

    Laser ranging systems now managed by the NASA Dynamics of the Solid Earth (DOSE) and operated by the Bendix Field Engineering Corporation, the University of Hawaii, and the University of Texas have produced a wealth on interdisciplinary scientific data over the last three decades. Despite upgrades to the most of the ranging station subsystems, the control computers remain a mix of 1970's vintage minicomputers. These encompass a wide range of vendors, operating systems, and languages, making hardware and software support increasingly difficult. Current technology allows replacement of controller computers at a relatively low cost while maintaining excellent processing power and a friendly operating environment. The new controller systems are now being designed using IBM-PC-compatible 80486-based microcomputers, a real-time Unix operating system (LynxOS), and X-windows/Motif IB, and serial interfaces have been chosen. This design supports minimizing short and long term costs by relying on proven standards for both hardware and software components. Currently, the project is in the design and prototyping stage with the first systems targeted for production in mid-1993.

  7. The Quest CCS Project - MMV Technology Deployment Through Two Years of Operation

    NASA Astrophysics Data System (ADS)

    O'Brien, S.

    2017-12-01

    In September 2012, Shell, on behalf of the Athabasca Oil Sands Project venture (Shell Canada Energy, Chevron Canada Limited, Marathon Oil Canada Corporation), announced that it was proceeding to construct the Quest Carbon Capture and Storage (CCS) project near Fort Saskatchewan. Quest is the world's first large-scale commercial application of CCS at an oil sands operation, and it is now capturing more than one million tonnes of CO2 per year from the Scotford Upgrader. It is a fully integrated project, involving CO2 capture at the bitumen upgrader, transportation along a 65 km pipeline, and CO2 storage in a deep saline aquifer (the Basal Cambrian Sands). Construction was completed in August 2015, and the Quest project was certified for commercial operation in September 2015. The Measurement, Monitoring and Verification (MMV) program for Quest is comprehensive, with a variety of technologies being used to monitor the atmosphere, hydrosphere, biosphere and geosphere. These include a Lightsource system for atmospheric monitoring, extensive groundwater sampling, DAS VSPs to assess the development of the CO2 plume, a microseismic array to measure any induced seismic activity, and temperature and pressure gauges for reservoir monitoring. Over two years of operations, this program has been optimized to address key risks while improving operational efficiency. Quest has now successfully captured and stored more than 2 million tonnes of CO2 with no MMV indications of any storage issues.

  8. E-SMART system for in-situ detection of environmental contaminants. Quarterly technical progress report, July--September 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    General Atomics (GA) leads a team of industrial, academic, and government organizations to develop the Environmental Systems Management, Analysis and Reporting neTwork (E-SMART) for the Defense Advanced Research Project Agency (DARPA), by way of this Technology Reinvestment Project (TRP). E-SMART defines a standard by which networks of smart sensing, sampling, and control devices can interoperate. E-SMART is intended to be an open standard, available to any equipment manufacturer. The user will be provided a standard platform on which a site-specific monitoring plan can be implemented using sensors and actuators from various manufacturers and upgraded as new monitoring devices become commerciallymore » available. This project will further develop and advance the E-SMART standardized network protocol to include new sensors, sampling systems, and graphical user interfaces.« less

  9. [Modularization by the open standard. (I)].

    PubMed

    Hirano, H

    2000-10-01

    We are proceeding with the project called "Open LA21 Project" in the course of the clinical laboratory automation toward the 21st century. With the modular system that realizes integration, downsizing, a reasonable price, and is the future course in the clinical testing automation system as well, we aim to establish common standards among manufacturers as the only way to create user friendly market environments where the proper competition exists among the manufacturers. The common standards which are in preparation by the participating companies as "Open module system standards" are the standards which are going to be made public. They are intended to guarantee connection, compatibility of the products in conformity with the standards. In this project, we intend to realize the modular system that integrates each field, such as chemistry, hematology, coagulation/fibrinolysis, immunology, urinalysis in an early stage, and contribute positively to restructuring and upgrading the "raison d'etre" of the 21st century clinical testing.

  10. Existing Whole-House Solutions Case Study: Bay Ridge Gardens - Mixed Humid Affordable Multifamily Housing Deep Energy Retrofit, Annapolis, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-10-01

    Under this project, the BA-PIRC research team evaluated the installation, measured performance, and cost-effectiveness of efficiency upgrade measures for a tenant-in-place deep energy retrofit at the Bay Ridge multifamily development in Annapolis, Maryland. The design and construction phase of the Bay Ridge project was completed in August 2012. This case study summarizes system commissioning, short-term test results, utility bill data analysis, and analysis of real-time data collected over a one-year period after the retrofit was complete.

  11. Collaborative Project. A Flexible Atmospheric Modeling Framework for the Community Earth System Model (CESM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gettelman, Andrew

    2015-10-01

    In this project we have been upgrading the Multiscale Modeling Framework (MMF) in the Community Atmosphere Model (CAM), also known as Super-Parameterized CAM (SP-CAM). This has included a major effort to update the coding standards and interface with CAM so that it can be placed on the main development trunk. It has also included development of a new software structure for CAM to be able to handle sub-grid column information. These efforts have formed the major thrust of the work.

  12. Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goggio Borgeson, Merrian; Zimring, Mark

    This guide focuses on clean energy financing options for school administrators, facility managers, and other K-12 school decision makers who are considering investments in high performance school projects. This guide explicitly focuses on comprehensive energy upgrades, those that involve multiple measures and are targeted toward achieving significant energy savings. Successful implementation of clean energy upgrades in schools is a matter of understanding the opportunity, making the commitment, and creatively tapping into available financing. This guide attempts to provide the foundation needed for successful projects in U.S. schools. It walks through the financing options available to K-12 schools and provides casemore » studies of six school districts from around the country.« less

  13. Airborne Warning and Control System Block 40/45 Upgrade (AWACS Blk 40/45 Upgrade)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-277 Airborne Warning and Control System Block 40/45 Upgrade (AWACS Blk 40/45 Upgrade) As of...Upgrade December 2015 SAR March 23, 2016 16:04:37 UNCLASSIFIED 2 Table of Contents Common Acronyms and Abbreviations for MDAP Programs 3 Program...Acquisition Unit Cost AWACS Blk 40/45 Upgrade December 2015 SAR March 23, 2016 16:04:37 UNCLASSIFIED 3 PB - President’s Budget PE - Program Element

  14. Chevron: Refinery Identifies $4.4 Million in Annual Savings by Using Process Simulation Models to Perform Energy-Efficiency Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-05-01

    In an energy-efficiency study at its refinery near Salt Lake City, Utah, Chevron focused on light hydrocarbons processing. The company found it could recover hydrocarbons from its fuel gas system and sell them. By using process simulation models of special distillation columns and associated reboilers and condensers, Chevron could predict the performance of potential equipment configuration changes and process modifications. More than 25,000 MMBtu in natural gas could be saved annually if a debutanizer upgrade project and a new saturated gas plant project were completed. Together, these projects would save $4.4 million annually.

  15. Safety system augmentation at Russian nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scerbo, J.A.; Satpute, S.N.; Donkin, J.Y.

    1996-12-31

    This paper describes the design and procurement of a Class IE DC power supply system to upgrade plant safety at the Kola Nuclear Power Plant (NPP). Kola NPP is located above the Arctic circle at Polyarnie Zorie, Murmansk, Russia. Kola NPP consists of four units. Units 1 and 2 have VVER-440/230 type reactors: Units 3 and 4 have VVER-440/213 type reactors. The VVER-440 reactor design is similar to the pressurized water reactor design used in the US. This project provided redundant, Class 1E DC station batteries and DC switchboards for Kola NPP, Units 1 and 2. The new DC powermore » supply system was designed and procured in compliance with current nuclear design practices and requirements. Technical issues that needed to be addressed included reconciling the requirements in both US and Russian codes and satisfying the requirements of the Russian nuclear regulatory authority. Close interface with ATOMENERGOPROEKT (AEP), the Russian design organization, KOLA NPP plant personnel, and GOSATOMNADZOR (GAN), the Russian version of US Nuclear Regulatory Commission, was necessary to develop a design that would assure compliance with current Russian design requirements. Hence, this project was expected to serve as an example for plant upgrades at other similar VVER-440 nuclear plants. In addition to technical issues, the project needed to address language barriers and the logistics of shipping equipment to a remote section of the Former Soviet Union (FSU). This project was executed by Burns and Roe under the sponsorship of the US DOE as part of the International Safety Program (INSP). The INSP is a comprehensive effort, in cooperation with partners in other countries, to improve nuclear safety worldwide. A major element within the INSP is the improvement of the safety of Soviet-designed nuclear reactors.« less

  16. Operation of molten carbonate fuel cells with different biogas sources: A challenging approach for field trials

    NASA Astrophysics Data System (ADS)

    Trogisch, S.; Hoffmann, J.; Daza Bertrand, L.

    In the past years research in the molten carbonate fuel cells (MCFC) area has been focusing its efforts on the utilisation of natural gas as fuel (S. Geitmann, Wasserstoff- & Brennstoffzellen-Projekte, 2002, ISBN 3-8311-3280-1). In order to increase the advantages of this technology, an international consortium has worked on the utilisation of biogas as fuel in MCFC. During the 4 years lasting RTD project EFFECTIVE two different gas upgrading systems have been developed and constructed together with two mobile MCFC test beds which were operated at different locations for approximately 2.000-5.000 h in each run with biogas from different origins and quality. The large variety of test locations has enabled to gather a large database for assessing the effect of the different biogas qualities on the complete system consisting of the upgrading and the fuel cell systems. The findings are challenging. This article also aims at giving an overview of the advantages of using biogas as fuel for fuel cells.

  17. Colorado River Sewer System Joint Venture to Upgrade Wastewater System

    EPA Pesticide Factsheets

    SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap

  18. Applicability of ASST-A helium refrigeration system for JLab End Station Refrigerator

    NASA Astrophysics Data System (ADS)

    Hasan, N.; Knudsen, P.; Ganni, V.

    2017-12-01

    The MØLLER experiment at Jefferson Lab (JLab) is a high power (5 kW) liquid hydrogen target scheduled to be operational in the 12 GeV-era. At present, cryogenic loads and targets at three of JLab’s four experimental halls are supported by the End Station Refrigerator (ESR) - a CTI/Helix 1.5 kW 4.5 K refrigerator. It is not capable of supporting the high power target load and a capacity upgrade of the ESR cryogenic system is essential. The ASST-A helium refrigeration system is a 4 kW 4.5 K refrigerator. It was designed and used for the Superconducting Super Collider Lab (SSCL) magnet string test and later obtained by JLab after the cancellation of that project. The modified ASST-A refrigeration system, which will be called ESR-II along with a support flow from JLab’s Central Helium Liquefier (CHL) is considered as an option for the End Station Refrigerator capacity upgrade. The applicability of this system for ESR-II under varying load conditions is investigated. The present paper outlines the findings of this process study.

  19. Blade Vibration Measurement System

    NASA Technical Reports Server (NTRS)

    Platt, Michael J.

    2014-01-01

    The Phase I project successfully demonstrated that an advanced noncontacting stress measurement system (NSMS) could improve classification of blade vibration response in terms of mistuning and closely spaced modes. The Phase II work confirmed the microwave sensor design process, modified the sensor so it is compatible as an upgrade to existing NSMS, and improved and finalized the NSMS software. The result will be stand-alone radar/tip timing radar signal conditioning for current conventional NSMS users (as an upgrade) and new users. The hybrid system will use frequency data and relative mode vibration levels from the radar sensor to provide substantially superior capabilities over current blade-vibration measurement technology. This frequency data, coupled with a reduced number of tip timing probes, will result in a system capable of detecting complex blade vibrations that would confound traditional NSMS systems. The hardware and software package was validated on a compressor rig at Mechanical Solutions, Inc. (MSI). Finally, the hybrid radar/tip timing NSMS software package and associated sensor hardware will be installed for use in the NASA Glenn spin pit test facility.

  20. Seismological and Geodynamic Monitoring Network in the "javakheti" Test Zone in the Southern Caucasus

    NASA Astrophysics Data System (ADS)

    Arakelyan, A.; Babayan, H.; Karakhanyan, A.; Durgaryan, R.; Basilaia, G.; Sokhadze, G.; Bidzinashvili, G.

    2012-12-01

    The Javakheti Highland located in the border region between Armenia and Georgia (sharing a border with Turkey) is an area in the Southern Caucasus of young Holocene-Quaternary volcanism and a region with convergence of a number of active faults. Issues related to the geometry, kinematics and slip-rate of these faults and assessment of their seismic hazard remain unclear in part due to the fragmentary nature of the studies carried out soley within the borders of each of the countries as opposed to region wide. In the frame of the ISTC A-1418 Project "Open network of scientific Centers for mitigation risk of natural hazards in the Southern Caucasus and Central Asia" the Javakheti Highland was selected as a trans-border test-zone. This designation allowed for the expansion and upgrading of the seismological and geodynamic monitoring networks under the auspices of several international projects (ISTC CSP-053 Project "Development of Communication System for seismic hazard situations in the Southern Caucasus and Central Asia", NATO SfP- 983284 Project "Caucasus Seismic Emergency Response") as well as through joint research programs with the National Taiwan University and Institute of Earth Sciences (IES, Taiwan), Universite Montpellier II (France) and Ecole et Observatoire des Sciences de la Terre-Université de Strasbourg (France). Studies of geodynamic processes, and seismicity of the region and their interaction have been carried out utilizing the newly established seismological and geodynamic monitoring networks and have served as a basis for the study of the geologic and tectonic structure . Upgrading and expansion of seismological and geodynamic networks required urgent solutions to the following tasks: Introduction of efficient online systems for information acquisition, accumulation and transmission (including sattelite systems) from permanent and temporary installed stations, Adoption of international standards for organization and management of databases in GIS format, Utilization of data archiving system working in intrnationally adopted formats and data exchange systems for communication with other international and national centers.

  1. RANT Building Upgrade Pre-Proposal Meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, Melinda Ann; Meadows, Darren W.; Rodriguez, Roger R.

    This presentation is designed to provide an overview of the project scope and RFP; discuss interfaces for the construction project; highlight key expectations and deliverables from the subcontractor; and address questions and provide clarification of the project scope.

  2. Legacy Systems Upgrade for Software Risk Assessment

    DTIC Science & Technology

    2001-12-01

    Nieto, T. R., Visual Basic 6: How to Program , Prentice Hall, Inc., 1999 Edson, David, Professional Development with Visio 2000: The...and the necessity for the program . Second, follow with a review of the enhancement algorithms and software extensions intended to add additional...taken prior to the programming . First, one must gain thorough understanding of the operation of VitéProject software and its interface with Visio

  3. Defense Energy Support Center Fact Book FY 2007

    DTIC Science & Technology

    2008-03-21

    3 M 21 years Fort Monmouth, NJ Lighting Upgrade, HVAC Renovation , UESC Implementation, GHP, Cogeneration System Site Preparation/Feasibility Ameresco...behalf of Navy Installations in the Sicily, Sardinia and Campania regions of Italy . Awards were made to two companies, ENEL Energia and Energia y...funded $333 million for SRM projects to maintain and renovate military Services owned fuels facilities worldwide . This amount was nearly double the

  4. The WCRP/GEWEX Surface Radiation Budget Project Release 2: An Assessment of Surface Fluxes at 1 Degree Resolution

    NASA Technical Reports Server (NTRS)

    Stackhouse, P. W., Jr.; Gupta, S. K.; Cox, S. J.; Chiacchio, M.; Mikovitz, J. C.

    2004-01-01

    The U.S. National Aeronautics and Space Administration (NASA) based Surface Radiation Budget (SRB) Project in association with the World Climate Research Programme Global Energy and Water Cycle Experiment (WCRP/GEWEX) is preparing a new 1 deg x 1 deg horizontal resolution product for distribution scheduled for release in early 2001. The new release contains several significant upgrades from the previous version. This paper summarizes the most significant upgrades and presents validation results as an assessment of the new data set.

  5. Progress of projection computed tomography by upgrading of the beamline 37XU of SPring-8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terada, Yasuko, E-mail: yterada@spring8.or.jp; Suzuki, Yoshio; Uesugi, Kentaro

    2016-01-28

    Beamline 37XU at SPring-8 has been upgraded for nano-focusing applications. The length of the beamline has been extended to 80 m. By utilizing this length, the beamline has advantages for experiments such as X-ray focusing, X-ray microscopic imaging and X-ray computed tomography. Projection computed tomography measurements were carried out at experimental hutch 3 located 80 m from the light source. CT images of a microcapsule have been successfully obtained with a wide X-ray energy range.

  6. Jefferson Lab 12 GEV Cebaf Upgrade

    NASA Astrophysics Data System (ADS)

    Rode, C. H.

    2010-04-01

    The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ˜6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a 310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

  7. Bioelectrochemical removal of carbon dioxide (CO2): an innovative method for biogas upgrading.

    PubMed

    Xu, Heng; Wang, Kaijun; Holmes, Dawn E

    2014-12-01

    Innovative methods for biogas upgrading based on biological/in-situ concepts have started to arouse considerable interest. Bioelectrochemical removal of CO2 for biogas upgrading was proposed here and demonstrated in both batch and continuous experiments. The in-situ biogas upgrading system seemed to perform better than the ex-situ one, but CO2 content was kept below 10% in both systems. The in-situ system's performance was further enhanced under continuous operation. Hydrogenotrophic methanogenesis and alkali production with CO2 absorption could be major contributors to biogas upgrading. Molecular studies showed that all the biocathodes associated with biogas upgrading were dominated by sequences most similar to the same hydrogenotrophic methanogen species, Methanobacterium petrolearium (97-99% sequence identity). Conclusively, bioelectrochemical removal of CO2 showed great potential for biogas upgrading. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Tractor Trailer Driver's Training Programs. Performance Report.

    ERIC Educational Resources Information Center

    New Hampshire Vocational Technical Coll., Nashua.

    This document describes a project to develop a 320-hour tractor trailer driver training program and a 20-hour commercial driver licensing upgrade training program. Of 34 graduates from the training program, 28 secured employment in the trucking industry. From August 1989 to June 1990, 725 students were trained in the upgrade training program with…

  9. Puerto Rico Nursing Career Cooperative Demonstration Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Puerto Rico State Dept. of Education, Hato Rey.

    The Puerto Rico Nursing Career Cooperative Demonstration Project and Associate Nursing Program provided education and onsite occupational training laboratory to upgrade the education of 20 licensed practical nurses (LPNs) from 1989-90. The nurses were upgraded to associate nurses in an 18-month period at the Technological Institute of Puerto Rico.…

  10. High Resolution BPM Upgrade for the ATF Damping Ring at KEK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eddy, N.; Briegel, C.; Fellenz, B.

    2011-08-17

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital down-conversion techniques, digital signal processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented. The next generation of linear colliders require ultra-low vertical emittance of <2 pm-rad. The damping ring at the KEK Accelerator Test Facilitymore » (ATF) is designed to demonstrate this mission critical goal. A high resolution beam position monitor (BPM) system for the damping ring is one of the key tools for realizing this goal. The BPM system needs to provide two distnict measurements. First, a very high resolution ({approx}100-200nm) closed-orbit measurement which is averaged over many turns and realized with narrowband filter techniques - 'narrowband mode'. This is needed to monitor and steer the beam along an optimum orbit and to facilitate beam-based alignment to minimize non-linear field effects. Second, is the ability to make turn by turn (TBT) measurements to support optics studies and corrections necessary to achieve the design performance. As the TBT measurement necessitates a wider bandwidth, it is often referred to as 'wideband mode'. The BPM upgrade was initiated as a KEK/SLAC/FNAL collaboration in the frame of the Global Design Initiative of the International Linear Collider. The project was realized and completed using Japan-US funds with Fermilab as the core partner.« less

  11. Analysis of STAT laboratory turnaround times before and after conversion of the hospital information system.

    PubMed

    Lowe, Gary R; Griffin, Yolanda; Hart, Michael D

    2014-08-01

    Modern electronic health record systems (EHRS) reportedly offer advantages including improved quality, error prevention, cost reduction, and increased efficiency. This project reviewed the impact on specimen turnaround times (TAT) and percent compliance for specimens processed in a STAT laboratory after implementation of an upgraded EHRS. Before EHRS implementation, laboratory personnel received instruction and training for specimen processing. One laboratory member per shift received additional training. TAT and percent compliance data sampling occurred 4 times monthly for 13 months post-conversion and were compared with the mean of data collected for 3 months pre-conversion. Percent compliance was gauged using a benchmark of reporting 95% of all specimens within 7 min from receipt. Control charts were constructed for TAT and percent compliance with control limits set at 2 SD and applied continuously through the data collection period. TAT recovered to pre-conversion levels by the 6th month post-conversion. Percent compliance consistently returned to pre-conversion levels by the 10th month post-conversion. Statistical analyses revealed the TAT were significantly longer for 3 months post-conversion (P < .001) compared with pre-conversion levels. Statistical significance was not observed for subsequent groups. Percent compliance results were significantly lower for 6 months post-conversion (P < .001). Statistical significance was not observed for subsequent groups. Extensive efforts were made to train and prepare personnel for challenges expected after the EHRS upgrade. Specific causes identified with the upgraded EHRS included multiple issues involving personnel and the EHRS. These data suggest that system and user issues contributed to delays in returning to pre-conversion TAT and percent compliance levels following the upgrade in the EHRS.

  12. The Current State of Data Transmission Channels from Pushchino to Moscow and Perspectives

    NASA Astrophysics Data System (ADS)

    Dumsky, D. V.; Isaev, E. A.; Samodurov, V. A.; Shatskaya, M. V.

    Since the work of a unique space radio telescope in the international VLBI project "Radioastron" extended to 2017 the transmission and storage of large volumes of scientific and telemetry data obtained during the experiments is still remains actual. This project is carried out by the Astro Space Center of Lebedev Physical Institute in Moscow, Russia. It requires us to maintain in operating state the high-speed link to merge into a single LAN buffer data center in Puschino and scientific information center in Moscow. Still relevant the chanal equipment monitoring system, and storage systems, as well as the timely replacement of hardware and software upgrades, backups, and documentation of the network infrastructure.

  13. Environmental Assessment for Proposed Royal Saudi Air Force F-15SA Beddown at Mountain Home Air Force Base

    DTIC Science & Technology

    2012-08-16

    designed for sophisticated air-to- ground attack capabilities and air-to-air superiority missions, using two crewmembers, a pilot and a weapon systems ...was added to the area of potential ground disturbance. This area comprises a total of 14.08 acres for all projects. As yet undefined infrastructure...upgrades, such as connecting new facilities to water and power systems would also add to the affected areas/ potential area of ground disturbance on

  14. Chapter 4: Small Commercial and Residential Unitary and Split System HVAC Heating and Cooling Equipment-Efficiency Upgrade Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W; Jacobson, David; Metoyer, Jarred

    The specific measure described here involves improving the overall efficiency in air-conditioning systems as a whole (compressor, evaporator, condenser, and supply fan). The efficiency rating is expressed as the energy efficiency ratio (EER), seasonal energy efficiency ratio (SEER), and integrated energy efficiency ratio (IEER). The higher the EER, SEER or IEER, the more efficient the unit is.

  15. E-SMART system for in-situ detection of environmental contaminants. Quarterly technical progress report, April--June 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-08-01

    General Atomics (GA) leads a team of industrial, academic, and government organizations in the development of the Environmental Systems Management, Analysis and Reporting neTwork (E-SMART) for the Defense Advanced Research Project Agency (DARPA), by way of this Technology Reinvestment Project (TRP). E-SMART defines a standard by which networks of smart sensing, sampling, and control devices can interoperate. E-SMART is intended to be an open standard, available to any equipment manufacturer. The user will be provided a standard platform on which a site-specific monitoring plan can be implemented using sensors and actuators from various manufacturers and upgraded as new monitoring devicesmore » become commercially available. This project will further develop and advance the E-SMART standardized network protocol to include new sensors, sampling systems, and graphical user interfaces.« less

  16. An overview of beam diagnostic and control systems for 50 MeV AREAL Linac

    NASA Astrophysics Data System (ADS)

    Sargsyan, A. A.; Amatuni, G. A.; Sahakyan, V. V.; Zanyan, G. S.; Martirosyan, N. W.; Vardanyan, V. V.; Grigoryan, B. A.

    2017-03-01

    Advanced Research Electron Accelerator Laboratory (AREAL) is an electron linear accelerator project with a laser driven RF gun being constructed at CANDLE Synchrotron Research Institute. After the successful operation of the gun section at 5 MeV, a program of facility energy enhancement up to 50 MeV is launched. In this paper the current status of existing diagnostic and control systems, as well as the results of electron beam parameter measurements are presented. The approaches of intended diagnostic and control systems for the upgrade program are also described.

  17. Interactive Classification Technology

    NASA Technical Reports Server (NTRS)

    deBessonet, Cary

    2000-01-01

    The investigators upgraded a knowledge representation language called SL (Symbolic Language) and an automated reasoning system called SMS (Symbolic Manipulation System) to enable the more effective use of the technologies in automated reasoning and interactive classification systems. The overall goals of the project were: 1) the enhancement of the representation language SL to accommodate a wider range of meaning; 2) the development of a default inference scheme to operate over SL notation as it is encoded; and 3) the development of an interpreter for SL that would handle representations of some basic cognitive acts and perspectives.

  18. Test Capability Enhancements to the NASA Langley 8-Foot High Temperature Tunnel

    NASA Technical Reports Server (NTRS)

    Harvin, S. F.; Cabell, K. F.; Gallimore, S. D.; Mekkes, G. L.

    2006-01-01

    The NASA Langley 8-Foot High Temperature Tunnel produces true enthalpy environments simulating flight from Mach 4 to Mach 7, primarily for airbreathing propulsion and aerothermal/thermo-structural testing. Flow conditions are achieved through a methane-air heater and nozzles producing aerodynamic Mach numbers of 4, 5 or 7 and have exit diameters of 8 feet or 4.5 feet. The 12-ft long free-jet test section, housed inside a 26-ft vacuum sphere, accommodates large test articles. Recently, the facility underwent significant upgrades to support hydrocarbon fueled scramjet engine testing and to expand flight simulation capability. The upgrades were required to meet engine system development and flight clearance verification requirements originally defined by the joint NASA-Air Force X-43C Hypersonic Flight Demonstrator Project and now the Air Force X-51A Program. Enhancements to the 8-Ft. HTT were made in four areas: 1) hydrocarbon fuel delivery; 2) flight simulation capability; 3) controls and communication; and 4) data acquisition/processing. The upgrades include the addition of systems to supply ethylene and liquid JP-7 to test articles; a Mach 5 nozzle with dynamic pressure simulation capability up to 3200 psf, the addition of a real-time model angle-of-attack system; a new programmable logic controller sub-system to improve process controls and communication with model controls; the addition of MIL-STD-1553B and high speed data acquisition systems and a classified data processing environment. These additions represent a significant increase to the already unique test capability and flexibility of the facility, and complement the existing array of test support hardware such as a model injection system, radiant heaters, six-component force measurement system, and optical flow field visualization hardware. The new systems support complex test programs that require sophisticated test sequences and precise management of process fluids. Furthermore, the new systems, such as the real-time angle of attack system and the new programmable logic controller enhance the test efficiency of the facility. The motivation for the upgrades and the expanded capabilities is described here.

  19. Generic particulate-monitoring system for retrofit to Hanford exhaust stacks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camman, J.W.; Carbaugh, E.H.

    1982-11-01

    Evaluations of 72 sampling and monitoring systems were performed at Hanford as the initial phase of a program to upgrade such systems. Each evaluation included determination of theoretical sampling efficiencies for particle sizes ranging from 0.5 to 10 micrometers aerodynamic equivalent diameter, addressing anisokinetic bias, sample transport line losses, and collector device efficiency. Upgrades needed to meet current Department of Energy guidance for effluent sampling and monitoring were identified, and a cost for each upgrade was estimated. A relative priority for each system's upgrade was then established based on evaluation results, current operational status, and future plans for the facilitymore » being exhausted. Common system upgrade requirements lead to the development of a generic design for common components of an exhaust stack sampling and monitoring system for airborne radioactive particulates. The generic design consists of commercially available off-the-shelf components to the extent practical and will simplify future stack sampling and monitoring system design, fabrication, and installation efforts. Evaluation results and their significance to system upgrades are empasized. A brief discussion of the analytical models used and experience to date with the upgrade program is included. Development of the generic stack sampling and monitoring system design is outlined. Generic system design features and limitations are presented. Requirements for generic system retrofitting to existing exhaust stacks are defined and benefits derived from generic system application are discussed.« less

  20. Upgrading the Space Shuttle Caution and Warning System

    NASA Technical Reports Server (NTRS)

    McCandless, Jeffrey W.; McCann, Robert S.; Hilty, Bruce T.

    2005-01-01

    A report describes the history and the continuing evolution of an avionic system aboard the space shuttle, denoted the caution and warning system, that generates visual and auditory displays to alert astronauts to malfunctions. The report focuses mainly on planned human-factors-oriented upgrades of an alphanumeric fault-summary display generated by the system. Such upgrades are needed because the display often becomes cluttered with extraneous messages that contribute to the difficulty of diagnosing malfunctions. In the first of two planned upgrades, the fault-summary display will be rebuilt with a more logical task-oriented graphical layout and multiple text fields for malfunction messages. In the second upgrade, information displayed will be changed, such that text fields will indicate only the sources (that is, root causes) of malfunctions; messages that are not operationally useful will no longer appear on the displays. These and other aspects of the upgrades are based on extensive collaboration among astronauts, engineers, and human-factors scientists. The report describes the human-factors principles applied in the upgrades.

  1. Utilization of the High Flux Isotope Reactor at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Selby, Douglas L; Bilheux, Hassina Z; Meilleur, Flora

    2015-01-01

    This paper addresses several aspects of the scientific utilization of the Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR). Topics to be covered will include: 1) HFIR neutron scattering instruments and the formal instrument user program; 2) Recent upgrades to the neutron scattering instrument stations at the reactor, and 3) eMod a new tool for addressing instrument modifications and providing configuration control and design process for scientific instruments at HFIR and the Spallation Neutron Source (SNS). There are 15 operating neutron instrument stations at HFIR with 12 of them organized into a formal user program. Since the last presentationmore » on HFIR instruments at IGORR we have installed a Single Crystal Quasi-Laue Diffractometer instrument called IMAGINE; and we have made significant upgrades to HFIR neutron scattering instruments including the Cold Triple Axis Instrument, the Wide Angle Neutron Diffractometer, the Powder Diffractometer, and the Neutron Imaging station. In addition, we have initiated upgrades to the Thermal Triple Axis Instrument and the Bio-SANS cold neutron instrument detector system. All of these upgrades are tied to a continuous effort to maintain a high level neutron scattering user program at the HFIR. For the purpose of tracking modifications such as those mentioned and configuration control we have been developing an electronic system for entering instrument modification requests that follows a modification or instrument project through concept development, design, fabrication, installation, and commissioning. This system, which we call eMod, electronically leads the task leader through a series of questions and checklists that then identifies such things as ES&H and radiological issues and then automatically designates specific individuals for the activity review process. The system has been in use for less than a year and we are still working out some of the inefficiencies, but we believe that this will become a very effective tool for achieving the configuration and process control believed to be necessary for scientific instrument systems.« less

  2. Design and implementation of an improved chilled water glycol system for NICI array electronics thermal enclosure

    NASA Astrophysics Data System (ADS)

    Gausachs, Gaston

    2008-07-01

    The Near Infrared Chronographic Imager (NICI) being commissioned at Gemini was upgraded with a more powerful Chilled Water Glycol System to address early overheating problems. The previous system was replaced with a completely new design favoring improved airflow and increased heat transfer capabilities. The research leading to this upgrade showed a significant lack of cooling power of the original design. The solution was a combination of commercial heat exchanger and fans and a custom built enclosure. As a prime infrared telescope facility, Gemini is very much interested in maintaining the least amount of heat dissipated to the ambient air. The results obtained through the implementation of this solution will be helpful in understanding the state of other existing electronics enclosures as well as those for new instruments to come. With the advent of electronic intensive AO systems, future electronics enclosures must take full advantage of improved cooling. This paper describes the design and implementation phases of the project. The results under maximum operating capacity proved to be within the expected theoretical values and were deemed successful.

  3. New tracking implementation in the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Berner, Jeff B.; Bryant, Scott H.

    2001-01-01

    As part of the Network Simplification Project, the tracking system of the Deep Space Network is being upgraded. This upgrade replaces the discrete logic sequential ranging system with a system that is based on commercial Digital Signal Processor boards. The new implementation allows both sequential and pseudo-noise types of ranging. The other major change is a modernization of the data formatting. Previously, there were several types of interfaces, delivering both intermediate data and processed data (called 'observables'). All of these interfaces were bit-packed blocks, which do not allow for easy expansion, and many of these interfaces required knowledge of the specific hardware implementations. The new interface supports four classes of data: raw (direct from the measuring equipment), derived (the observable data), interferometric (multiple antenna measurements), and filtered (data whose values depend on multiple measurements). All of the measurements are reported at the sky frequency or phase level, so that no knowledge of the actual hardware is required. The data is formatted into Standard Formatted Data Units, as defined by the Consultative Committee for Space Data Systems, so that expansion and cross-center usage is greatly enhanced.

  4. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    Efforts this quarter have concentrated on legal agreements, including alternative field sites. Preliminary design of the bench-scale equipment has been initiated. Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranesmore » provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting in equipment 50--70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project.« less

  5. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting inmore » equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. KPS and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on legal agreements, including alternative field sites. Preliminary design of the bench-scale equipment continues.« less

  6. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting inmore » equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on legal agreements, including alternative field sites. Preliminary design of the bench-scale equipment continues.« less

  7. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    Efforts this quarter have concentrated on legal agreements, including alternative field sites. Preliminary design of the bench-scale equipment continues. Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide muchmore » greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting in equipment 50--70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project.« less

  8. Mass Storage System Upgrades at the NASA Center for Computational Sciences

    NASA Technical Reports Server (NTRS)

    Tarshish, Adina; Salmon, Ellen; Macie, Medora; Saletta, Marty

    2000-01-01

    The NASA Center for Computational Sciences (NCCS) provides supercomputing and mass storage services to over 1200 Earth and space scientists. During the past two years, the mass storage system at the NCCS went through a great deal of changes both major and minor. Tape drives, silo control software, and the mass storage software itself were upgraded, and the mass storage platform was upgraded twice. Some of these upgrades were aimed at achieving year-2000 compliance, while others were simply upgrades to newer and better technologies. In this paper we will describe these upgrades.

  9. Rejuvenation of a ten-year old AO curvature sensor: combining obsolescence correction and performance upgrade of MACAO

    NASA Astrophysics Data System (ADS)

    Haguenauer, P.; Fedrigo, E.; Pettazzi, L.; Reinero, C.; Gonte, F.; Pallanca, L.; Frahm, R.; Woillez, J.; Lilley, P.

    2016-07-01

    The MACAO curvature wavefront sensors have been designed as a generic adaptive optics sensor for the Very Large Telescope. Six systems have been manufactured and implemented on sky: four installed in the UTs Coudé train as an AO facility for the VLTI, and two in UT's instruments, SINFONI and CRIRES. The MACAO-VLTI have now been in use for scientific operation for more than a decade and are planned to be operated for at least ten more years. As second generation instruments for the VLTI were planned to start implementation in end of 2015, accompanied with a major upgrade of the VLTI infrastructure, we saw it as a good time for a rejuvenation project of these systems, correcting the obsolete components. This obsolescence correction also gave us the opportunity to implement improved capabilities: the correction frequency was pushed from 420 Hz to 1050 Hz, and an automatic vibrations compensation algorithm was added. The implementation on the first MACAO was done in October 2014 and the first phase of obsolescence correction was completed in all four MACAO-VLTI systems in October 2015 with the systems delivered back to operation. The resuming of the scientific operation of the VLTI on the UTs in November 2015 allowed to gather statistics in order to evaluate the improvement of the performances through this upgrade. A second phase of obsolescence correction has now been started, together with a global reflection on possible further improvements to secure observations with the VLTI.

  10. Methods and Techniques for Risk Prediction of Space Shuttle Upgrades

    NASA Technical Reports Server (NTRS)

    Hoffman, Chad R.; Pugh, Rich; Safie, Fayssal

    1998-01-01

    Since the Space Shuttle Accident in 1986, NASA has been trying to incorporate probabilistic risk assessment (PRA) in decisions concerning the Space Shuttle and other NASA projects. One major study NASA is currently conducting is in the PRA area in establishing an overall risk model for the Space Shuttle System. The model is intended to provide a tool to predict the Shuttle risk and to perform sensitivity analyses and trade studies including evaluation of upgrades. Marshall Space Flight Center (MSFC) and its prime contractors including Pratt and Whitney (P&W) are part of the NASA team conducting the PRA study. MSFC responsibility involves modeling the External Tank (ET), the Solid Rocket Booster (SRB), the Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME). A major challenge that faced the PRA team is modeling the shuttle upgrades. This mainly includes the P&W High Pressure Fuel Turbopump (HPFTP) and the High Pressure Oxidizer Turbopump (HPOTP). The purpose of this paper is to discuss the various methods and techniques used for predicting the risk of the P&W redesigned HPFTP and HPOTP.

  11. Venus Global Reference Atmospheric Model Status and Planned Updates

    NASA Technical Reports Server (NTRS)

    Justh, H. L.; Dwyer Cianciolo, A. M.

    2017-01-01

    The Venus Global Reference Atmospheric Model (Venus-GRAM) was originally developed in 2004 under funding from NASA's In Space Propulsion (ISP) Aerocapture Project to support mission studies at the planet. Many proposals, including NASA New Frontiers and Discovery, as well as other studies have used Venus-GRAM to design missions and assess system robustness. After Venus-GRAM's release in 2005, several missions to Venus have generated a wealth of additional atmospheric data, yet few model updates have been made to Venus-GRAM. This paper serves to address three areas: (1) to present the current status of Venus-GRAM, (2) to identify new sources of data and other upgrades that need to be incorporated to maintain Venus-GRAM credibility and (3) to identify additional Venus-GRAM options and features that could be included to increase its capability. This effort will de-pend on understanding the needs of the user community, obtaining new modeling data and establishing a dedicated funding source to support continual up-grades. This paper is intended to initiate discussion that can result in an upgraded and validated Venus-GRAM being available to future studies and NASA proposals.

  12. Status of mirror segment production for the Giant Magellan Telescope

    NASA Astrophysics Data System (ADS)

    Martin, H. M.; Burge, J. H.; Davis, J. M.; Kim, D. W.; Kingsley, J. S.; Law, K.; Loeff, A.; Lutz, R. D.; Merrill, C.; Strittmatter, P. A.; Tuell, M. T.; Weinberger, S. N.; West, S. C.

    2016-07-01

    The Richard F. Caris Mirror Lab at the University of Arizona is responsible for production of the eight 8.4 m segments for the primary mirror of the Giant Magellan Telescope, including one spare off-axis segment. We report on the successful casting of Segment 4, the center segment. Prior to generating the optical surface of Segment 2, we carried out a major upgrade of our 8.4 m Large Optical Generator. The upgrade includes new hardware and software to improve accuracy, safety, reliability and ease of use. We are currently carrying out an upgrade of our 8.4 m polishing machine that includes improved orbital polishing capabilities. We added and modified several components of the optical tests during the manufacture of Segment 1, and we have continued to improve the systems in preparation for Segments 2-8. We completed two projects that were prior commitments before GMT Segment 2: casting and polishing the combined primary and tertiary mirrors for the LSST, and casting and generating a 6.5 m mirror for the Tokyo Atacama Observatory.

  13. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Upgrading of existing UST systems. 280.21 Section 280.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.21 Upgrading of...

  14. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Upgrading of existing UST systems. 280.21 Section 280.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.21 Upgrading of...

  15. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Upgrading of existing UST systems. 280.21 Section 280.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.21 Upgrading of...

  16. OPERATIONAL RETRIEVAL, THE BASIC EDUCATION COMPONENT OF EXPERIMENTAL AND DEMONSTRATION PROJECTS (E/D) FOR DISADVANTAGED YOUTHS.

    ERIC Educational Resources Information Center

    SEXTON, PATRICIA CAYO

    IN THIS STUDY OF EXPERIMENTAL AND DEMONSTRATION BASIS EDUCATION PROJECTS FOR DISADVANTAGED YOUTHS, VISITS WERE MADE TO THE JOB UPGRADING PROJECT (NORTH RICHMOND, CALIFORNIA), THE MAYOR'S YOUTH EMPLOYMENT PROJECT (DETROIT), THE LANE COUNTY YOUTH PROJECT (EUGENE, OREGON), JOB OPPORTUNITIES, THROUGH BETTER SKILLS (CHICAGO), THE YMCA…

  17. Change management and clinical engagement: critical elements for a successful clinical information system implementation.

    PubMed

    Detwiller, Maureen; Petillion, Wendy

    2014-06-01

    Moving a large healthcare organization from an old, nonstandardized clinical information system to a new user-friendly, standards-based system was much more than an upgrade to technology. This project to standardize terminology, optimize key processes, and implement a new clinical information system was a large change initiative over 4 years that affected clinicians across the organization. Effective change management and engagement of clinical stakeholders were critical to the success of the initiative. The focus of this article was to outline the strategies and methodologies used and the lessons learned.

  18. Alarm upgrade meets new standards.

    PubMed

    2004-11-01

    When Bedford Hospital NHS Trust decided to replace its ageing and increasingly unreliable fire detection and alarm system, it was looking to achieve more than just compliance with the latest regulations. It wanted a flexible, state-of-the-art system that would not only meet its current requirements but would also be easy to adapt and inexpensive to maintain. The pound 1 million Gent Vigilon fire system now operating across the site has given it just that. The 15-month long project to install the system was completed without a single ward or operating theatre having to be shut down.

  19. TSX-PLUS MULTI-TASKING UPGRADE FOR THE NICOLET L-11 POWDER DIFFRACTION SYSTEM.

    USGS Publications Warehouse

    Fitzpatrick, J.; Queen, David L.

    1985-01-01

    In August of 1982, a single-user, dual-translator, automated powder diffraction system was purchased by the Denver Research Institute for use on project work in the Chemical and Materials Sciences Division. Within a short period of time, the system had already become saturated with users. Scheduling conflicts arose. In view of these problems, an answer was sought in the form of hardware and software changes which would allow many users access to the system simultaneously. A low-cost, minimum impact solution was eventually found. The elements of the solution are reported.

  20. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    NASA Astrophysics Data System (ADS)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the National Observatory of Athens (NOA), the German Leibniz Institute for Tropospheric Research (TROPOS) and the Cyprus Department of Electronic Communications of the Ministry of Transport, Communications and Works (DEC-MTCW).

  1. Ultrasonic humidification for telecommunications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Longo, F.

    1994-03-01

    This article examines two installations which demonstrate that ultrasonic humidification is an excellent option for large-scale commercial installations. Many existing telephone switching centers constructed 20 to 30 years ago were equipped with electro-mechanical switching equipment that was not sensitive to humidity. Today's sophisticated solid-state telecommunications equipment requires specific levels of relative humidity to operate properly. Over the last several years, Einhorn Yaffee Prescott (formerly Rose Beaton + Rose) designed two of the largest ultrasonic humidification systems at telecommunications buildings located in Cheshire, Conn., and White Plains, N.Y. The Cheshire project was a retrofit to the existing system in a 1960smore » building; the White Plains project involved an upgrade to a totally new air handling system, including an ultrasonic humidification component, in a 1950s building.« less

  2. Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities

    NASA Astrophysics Data System (ADS)

    Perin, A.; Dhalla, F.; Gayet, P.; Serio, L.

    2017-12-01

    SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&D program for superconducting magnets and RF equipment until 2023 and beyond. This article presents the assessment of the cryogenic needs based on the foreseen test program and on past testing experience. The current configuration of the cryogenic infrastructure is presented and several possible upgrade scenarios are discussed. The chosen upgrade configuration is then described and the characteristics of the main newly required cryogenic equipment, in particular a new 35 g/s helium liquefier, are presented. The upgrade implementation strategy and plan to meet the required schedule are then described.

  3. The STAR Detector Upgrades and Electromagnetic Probes in Beam Energy Scan Phase II

    NASA Astrophysics Data System (ADS)

    Yang, Chi

    The Beam Energy Scan Phase II at RHIC, BES-II, is scheduled from year 2019 to 2020 and will explore the high baryon density region of the QCD phase diagram with high precision. The program will focus on the interesting energy region determined from the results of BES-I. Some of the key measurements anticipated are the chiral symmetry restoration and QGP thermal radiation in the dilepton and direct photon channels. The measurements will be possible with an order of magnitude better statistics provided by the electron cooling upgrade of RHIC and with the detector upgrades planned to extend STAR experimental reach. The upgrades are: the inner Time Projection Chamber sectors (iTPC), the Event Plane Detector (EPD), and the end-cap Time of Flight (eTOF). We present the BES-II program details and the physics opportunities in the dilepton and direct photon channels enabled by the upgrades.

  4. Upgrading Supply Chain Management Systems to Improve Availability of Medicines in Tanzania: Evaluation of Performance and Cost Effects.

    PubMed

    Mwencha, Marasi; Rosen, James E; Spisak, Cary; Watson, Noel; Kisoka, Noela; Mberesero, Happiness

    2017-09-27

    To address challenges in public health supply chain performance, Tanzania invested in a national logistics management unit (LMU) and a national electronic logistics management information system (eLMIS). This evaluation examined the impact of those 2 key management upgrades approximately 1 year after they were introduced. We used a nonexperimental pre-post study design to compare the previous system with the upgraded management system. We collected baseline data from August to November 2013. We conducted round 1 of post-implementation data collection during April and May 2015, about 1 year after implementation of the upgrades. We evaluated key indicators of data use and reporting; supply chain management practices such as storage and supervision; supply chain performance including stock-out and expiry rates; and supply chain cost and savings. We analyzed the data using a range of techniques including statistical testing of baseline and round-1 results, and cost, cost-effectiveness, and return on investment analysis. The upgrades were associated with improvements in data use, accessibility, visibility, and transparency; planning, control, and monitoring; support for quantification; stock-out rates; stock-out duration; commodity expiry; and forecast error. The upgraded system was more costly, but it was also more efficient, particularly when adjusting for the performance improvements. The upgrades also generated substantial savings that defrayed some, but not all, of the investment costs. Upgrades to Tanzania's supply chain management systems created multiple and complex pathways to impact. One year after implementation, the LMU and eLMIS brought about performance improvements through better data use and through improvements in some, but not all, management practices. Furthermore, the upgrades-while not inexpensive-contributed to greater system efficiency and modest savings. © Mwencha et al.

  5. Systems budgets architecture and development for the Maunakea Spectroscopic Explorer

    NASA Astrophysics Data System (ADS)

    Mignot, Shan; Flagey, Nicolas; Szeto, Kei; Murowinski, Rick; McConnachie, Alan

    2016-08-01

    The Maunakea Spectroscopic Explorer (MSE) project is an enterprise to upgrade the existing Canada-France- Hawaii observatory into a spectroscopic facility based on a 10 meter-class telescope. As such, the project relies on engineering requirements not limited only to its instruments (the low, medium and high resolution spectrographs) but for the whole observatory. The science requirements, the operations concept, the project management and the applicable regulations are the basis from which these requirements are initially derived, yet they do not form hierarchies as each may serve several purposes, that is, pertain to several budgets. Completeness and consistency are hence the main systems engineering challenges for such a large project as MSE. Special attention is devoted to ensuring the traceability of requirements via parametric models, derivation documents, simulations, and finally maintaining KAOS diagrams and a database under IBM Rational DOORS linking them together. This paper will present the architecture of the main budgets under development and the associated processes, expand to highlight those that are interrelated and how the system, as a whole, is then optimized by modelling and analysis of the pertinent system parameters.

  6. KSC-99pp1227

    NASA Image and Video Library

    1999-10-06

    Children at Audubon Elementary School, Merritt Island, Fla., eagerly unwrap computer equipment donated by Kennedy Space Center. Audubon is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. KSC employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated

  7. Cambridge Elementary students enjoy gift of computers

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Children at Cambridge Elementary School, Cocoa, Fla., eagerly unwrap computer equipment donated by Kennedy Space Center. Cambridge is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. Behind the children is Jim Thurston, a school volunteer and retired employee of USBI, who shared in the project. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. Ksc employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated.

  8. KSC-99pp1228

    NASA Image and Video Library

    1999-10-06

    Children at Cambridge Elementary School, Cocoa, Fla., eagerly unwrap computer equipment donated by Kennedy Space Center. Cambridge is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. Behind the children is Jim Thurston, a school volunteer and retired employee of USBI, who shared in the project. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. KSC employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated

  9. SNS proton power upgrade

    NASA Astrophysics Data System (ADS)

    Howell, M.; DeGraff, B.; Galambos, J.; Kim, S.-H.

    2017-12-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is preparing for the Proton Power Upgrade (PPU) project to increase the output energy of the accelerator from 1.0 GeV to 1.3 GeV. As part of this project with the combination of increasing the output energy and beam current, the beam power capability will be doubled from 1.4MW to 2.8MW. In this project, seven new high beta cryomodules housing 28 superconducting niobium cavities will be added to the LINAC tunnel. Lessons learned from over ten years of operation will be incorporated into the new cryomodule and cavity design. The design and the fabrication of these cryomodules and how these will be integrated into the existing accelerator will be detailed in this paper.

  10. Upgrading the Control Systems of Turbines of K-160-12.8 Type Produced by PAO Turboatom

    NASA Astrophysics Data System (ADS)

    Babayev, I. N.

    2018-05-01

    Steam turbines of a K-160-12.8 (PVK-150) type produced by PAO Turboatom are operated at thermal power plants from the 1960s and many of them still have the complete set that was installed at that time by the factory, but they have become out of date. For this reason, the problem of upgrading the turbines to bring their characteristics into compliance with modern requirements is relevant. This article describes the main technical decisions adopted by PAO Turboatom when upgrading the automatic control system (ACS) of a K-160-12.8 (PVK-150) turbine: replacing the control valves (CV); replacing the distributing mechanism; replacing the front support components, including the main servomotor and oil control pipes; and replacing the assembly of cutoff spools by separate spools of servomotors of high-pressure control valves and reheat control valves. The schematic diagram of the ACS and description of the structure of newly installed mechanisms are presented: the cutoff spools, the high-pressure CVs, the distribution mechanism, and the main servomotor. The particularity of the ACS is the presence of electromechanical converters, which are used in each cutoff spool. For improving operating reliability of the ACS by providing the actuation of servomotors of control valves for closing regardless of ACS commands, the connection of rods of the electromechanical converter and cutoff spools are made using spring-type uncoupling devices. For actuation of the protection system by the commands of the automatic electronic safety device, the separate actuator driven by an electromagnet is installed in the ACS. During further improvement of the protection system, it is recommended to replace the controller assembly by two-spool protection devices, remove the protection spool assembly, and increase the pressure in the protection lines up to power pressure. The upgrading during this project was carried out by the Dobrotvor TPP (Ukraine).

  11. Characterization of a hybrid GEM-Micromegas detector with respect to its application in a continuously read out TPC

    NASA Astrophysics Data System (ADS)

    Ratza, Viktor; Ball, Markus; Liebtrau, M.; Ketzer, Bernhard

    2018-02-01

    In the context of the upgrade of the LHC during the second long shutdown the interaction rate of the ALICE experiment will be increased up to 50 kHz for Pb-Pb collisions. As a consequence, a continuous read-out of the Time Projection Chamber (TPC) will be required. To keep the space-charge distortions at a manageable size, the ion backflow of the charge amplification system has to be significantly reduced. At the same time an excellent detector performance and stability of the system has to be maintained. A solution with four Gaseous Electron Multipliers (GEMs) has been adopted as baseline solution for the upgraded chambers. As an alternative approach a hybrid GEM-Micromegas detector consisting of one Micromegas (MM) and two GEMs has been investigated. The recent results of the study of the hybrid GEM-Micromegas detector will be presented and compared to measurements with four GEM foils.

  12. FOST 2 Upgrade with Hollow-Fiber CTA FO Module and Generation of Osmotic Agent for Microorganism Growth Studies

    NASA Technical Reports Server (NTRS)

    Parodi, Jurek; Mangado, Jaione Romero; Stefanson, Ofir; Flynn, Michael; Shaw, Hali; Beeler, David

    2016-01-01

    FOST 2 is an integrated membrane system that incorporates a forward osmosis subsystem and a reverse osmosis subsystem working in series. It has been designed as a post treatment system to process the effluent from the Membrane Aerated Biological Reactor developed at NASA Johnson Space Center and Texas Tech University. Its function is to remove dissolved solids residual such as ammonia and suspended solids, as well as to provide a physical barrier to microbial and viral contamination. A tubular CTA membrane module from HTI and a flat-sheet lipid-base membrane module from Porifera were integrated and tested on FOST 2 in the past, using both a bioreactor's effluent and greywater as the feed solution. This paper documents the performance of FOST 2 after its upgrade with a hollow-fiber CTA membrane module from Toyobo, treating real black-water to generate the osmotic agent solution necessary to conduct growth studies of genetically engineered microorganism for the Synthetic Biological Membrane project.

  13. Fermilab | OCSR | Home

    Science.gov Websites

    Upgrade Project Fermilab Campus Master Plan Fermilab Campus & Facilities Planning Board Fermilab Chief Operations Officer, leads development of campus master planning and the associated execution of a program. The Campus Strategy identifies projects over a ten-year planning horizon to meet the projected

  14. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressingmore » the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.« less

  15. Subtask 3.9 - Direct Coal Liquefaction Process Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aulich, Ted; Sharma, Ramesh

    The Energy and Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) and Accelergy Corporation, an advanced fuels developer with technologies exclusively licensed from ExxonMobil, undertook Subtask 3.9 to design, build, and preliminarily operate a bench-scale direct coal liquefaction (DCL) system capable of converting 45 pounds/hour of pulverized, dried coal to a liquid suitable for upgrading to fuels and/or chemicals. Fabrication and installation of the DCL system and an accompanying distillation system for off-line fractionation of raw coal liquids into 1) a naphtha middle distillate stream for upgrading and 2) a recycle stream was completed inmore » May 2012. Shakedown of the system was initiated in July 2012. In addition to completing fabrication of the DCL system, the project also produced a 500-milliliter sample of jet fuel derived in part from direct liquefaction of Illinois No. 6 coal, and submitted the sample to the Air Force Research Laboratory (AFRL) at Wright Patterson Air Force Base, Dayton, Ohio, for evaluation. The sample was confirmed by AFRL to be in compliance with all U.S. Air Force-prescribed alternative aviation fuel initial screening criteria.« less

  16. Radial Inflow Turboexpander Redesign

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    William G. Price

    2001-09-24

    Steamboat Envirosystems, LLC (SELC) was awarded a grant in accordance with the DOE Enhanced Geothermal Systems Project Development. Atlas-Copco Rotoflow (ACR), a radial expansion turbine manufacturer, was responsible for the manufacturing of the turbine and the creation of the new computer program. SB Geo, Inc. (SBG), the facility operator, monitored and assisted ACR's activities as well as provided installation and startup assistance. The primary scope of the project is the redesign of an axial flow turbine to a radial inflow turboexpander to provide increased efficiency and reliability at an existing facility. In addition to the increased efficiency and reliability, themore » redesign includes an improved reduction gear design, and improved shaft seal design, and upgraded control system and a greater flexibility of application« less

  17. Developing Multimedia Enhanced Content to Upgrade Subject Content Knowledge of Secondary School Teachers in Tanzania

    ERIC Educational Resources Information Center

    Mtebe, Joel S.; Kibga, Elia Y.; Mwambela, Alfred A.; Kissaka, Mussa M.

    2015-01-01

    The failure rates and lack of interest amongst students in science and mathematics in secondary schools in Tanzania is a serious problem. The Ministry of Education and Vocational Training (MoEVT) implemented a project to enhance and upgrade the pedagogical knowledge and subject content knowledge of teachers in selected difficult topics in science…

  18. Upgrades, Current Capabilities and Near-Term Plans of the NASA ARC Mars Climate

    NASA Technical Reports Server (NTRS)

    Hollingsworth, J. L.; Kahre, Melinda April; Haberle, Robert M.; Schaeffer, James R.

    2012-01-01

    We describe and review recent upgrades to the ARC Mars climate modeling framework, in particular, with regards to physical parameterizations (i.e., testing, implementation, modularization and documentation); the current climate modeling capabilities; selected research topics regarding current/past climates; and then, our near-term plans related to the NASA ARC Mars general circulation modeling (GCM) project.

  19. Boosting Bandwidth: Colleges Are Upgrading Their Network Infrastructure to Support Next-Generation Technologies

    ERIC Educational Resources Information Center

    Wong, Wylie

    2014-01-01

    In October 2013, nearly half of U.S. community colleges--46.2 percent-- said upgrading their campus networks is a "very important priority" within the next three years, according to The Campus Computing Project, a survey of 94 community colleges. More robust networks are needed to support a host of new wireless access points and the…

  20. NASA Glenn PSL-3 and 4 Control System Upgrade

    NASA Technical Reports Server (NTRS)

    Lizanich, Paul J.

    2010-01-01

    An overview of the PSL-3&4 Jet Engine Test Facility control system; including its history, a description of the present effort to upgrade from Emerson Ovation v2.2 to V3.3.1, and future upgrade plans is shown.

  1. Environmental impact assessment of oilfield upgrades in Bohai Sea

    NASA Astrophysics Data System (ADS)

    Chen, Ruihui; Xiong, Yanna; Li, Jiao; Li, Xianbo

    2018-02-01

    This paper designed 65 environmental monitoring sites to collect samples and analyze for better evaluating the environmental impact generated by cuttings, mud, produced water with oil and oil pollutions that produced during the upgrading in the Bohai Sea where the oil field 34-1 upgraded. Collecting samples include ocean water, marine life and sediments and test items involve PH, dissolved oxygen (DO), salinity, chemical oxygen demand (COD), phosphate, organic carbon, sulfide, inorganic nitrogen, petroleum, copper (Cu), lead (Pb), zinc (Zn), cadmium (Cd), total chromium (Cr), total mercury (Hg) and arsenic (As). Meanwhile sample sites collect and analyze the abundance and diversity of marine plants and elaborated the environmental impact caused by upgrading renovation project from the aspects of sea water, marine life and marine sediments. Through analysis and comparison we found that seawater quality conform the Ш seawater quality standards, the excessive rate of Cu is 10%, the average diversity index of marine life is 2.34 and evenness is 0.68. Influence range of marine sediments and pollutants of production is within 2.68km and basically has no serious impact in the surrounding sea area. It’s worth nothing that reconstruction project has the risk of oil spilling and protective measures must be prepared.

  2. JPL's Real-Time Weather Processor project (RWP) metrics and observations at system completion

    NASA Technical Reports Server (NTRS)

    Loesh, Robert E.; Conover, Robert A.; Malhotra, Shan

    1990-01-01

    As an integral part of the overall upgraded National Airspace System (NAS), the objective of the Real-Time Weather Processor (RWP) project is to improve the quality of weather information and the timeliness of its dissemination to system users. To accomplish this, an RWP will be installed in each of the Center Weather Service Units (CWSUs), located in 21 of the 23 Air Route Traffic Control Centers (ARTCCs). The RWP System is a prototype system. It is planned that the software will be GFE and that production hardware will be acquired via industry competitive procurement. The ARTCC is a facility established to provide air traffic control service to aircraft operating on Instrument Flight Rules (IFR) flight plans within controlled airspace, principally during the en route phase of the flight. Covered here are requirement metrics, Software Problem Failure Reports (SPFRs), and Ada portability metrics and observations.

  3. SAMPA Chip: the New 32 Channels ASIC for the ALICE TPC and MCH Upgrades

    NASA Astrophysics Data System (ADS)

    Adolfsson, J.; Ayala Pabon, A.; Bregant, M.; Britton, C.; Brulin, G.; Carvalho, D.; Chambert, V.; Chinellato, D.; Espagnon, B.; Hernandez Herrera, H. D.; Ljubicic, T.; Mahmood, S. M.; Mjörnmark, U.; Moraes, D.; Munhoz, M. G.; Noël, G.; Oskarsson, A.; Osterman, L.; Pilyar, A.; Read, K.; Ruette, A.; Russo, P.; Sanches, B. C. S.; Severo, L.; Silvermyr, D.; Suire, C.; Tambave, G. J.; Tun-Lanoë, K. M. M.; van Noije, W.; Velure, A.; Vereschagin, S.; Wanlin, E.; Weber, T. O.; Zaporozhets, S.

    2017-04-01

    This paper presents the test results of the second prototype of SAMPA, the ASIC designed for the upgrade of read-out front end electronics of the ALICE Time Projection Chamber (TPC) and Muon Chamber (MCH). SAMPA is made in a 130 nm CMOS technology with 1.25 V nominal voltage supply and provides 32 channels, with selectable input polarity, and three possible combinations of shaping time and sensitivity. Each channel consists of a Charge Sensitive Amplifier, a semi-Gaussian shaper and a 10-bit ADC; a Digital Signal Processor provides digital filtering and compression capability. In the second prototype run both full chip and single test blocks were fabricated, allowing block characterization and full system behaviour studies. Experimental results are here presented showing agreement with requirements for both the blocks and the full chip.

  4. User and Performance Impacts from Franklin Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    He, Yun

    2009-05-10

    The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

  5. Applied Meteorology Unit (AMU)

    NASA Technical Reports Server (NTRS)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Wheeler, Mark

    2010-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2010 (October - December 2009). A detailed project schedule is included in the Appendix. Included tasks are: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool, Phase III, (3) Peak Wind Tool for General Forecasting, Phase II, (4) Upgrade Summer Severe Weather Tool in Meteorological Interactive Data Display System (MIDDS), (5) Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS) Update and Maintainability, (5) Verify 12-km resolution North American Model (MesoNAM) Performance, and (5) Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) Graphical User Interface.

  6. Challenges and Plans for Injection and Beam Dump

    NASA Astrophysics Data System (ADS)

    Barnes, M.; Goddard, B.; Mertens, V.; Uythoven, J.

    The injection and beam dumping systems of the LHC will need to be upgraded to comply with the requirements of operation with the HL-LHC beams. The elements of the injection system concerned are the fixed and movable absorbers which protect the LHC in case of an injection kicker error and the injection kickers themselves. The beam dumping system elements under study are the absorbers which protect the aperture in case of an asynchronous beam dump and the beam absorber block. The operational limits of these elements and the new developments in the context of the HL-LHC project are described.

  7. New Carrollton Federal Building Lighting Retrofit Captures Cool Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2017-01-01

    Case study describes how the U.S. General Services Administration cut a $291,000 annual lighting electric bill to an estimated $53,500 by upgrading their fluorescent lighting to a new LED troffer lighting and controls system in the New Carrollton Federal Building in Lanham, Maryland. The lighting project yielded an 82% reduction in energy use and earned GSA two awards for exemplary performance from the Interior Lighting Campaign in 2016.

  8. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-01

    This is an onboard photo of the Hubble Space Telescope (HST) power control unit (PCU), the heart of the HST's power system. STS-109 payload commander John M. Grunsfeld, joined by Astronaut Richard M. Lirnehan, turned off the telescope in order to replace its PCU while participating in the third of five spacewalks dedicated to servicing and upgrading the HST. Other upgrades performed were: replacement of the solar array panels; replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-Object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where crew members completed the system upgrades. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. Launched March 1, 2002 the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  9. Jefferson Lab CLAS12 Superconducting Solenoid magnet Requirements and Design Evolution

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rajput-Ghoshal, Renuka; Hogan, John P.; Fair, Ruben J.

    2014-12-01

    As part of the Jefferson Lab 12GeV accelerator upgrade project, one of the experimental halls (Hall B) requires two superconducting magnets. One is a magnet system consisting of six superconducting trapezoidal racetrack-type coils assembled in a toroidal configuration and the second is an actively shielded solenoidal magnet system consisting of 5 coils. In this presentation the physics requirements for the 5 T solenoid magnet, design constraints, conductor decision, and cooling choice will be discussed. The various design iterations to meet the specification will also be discussed in this presentation.

  10. PROGRAMS TO UPGRADE CULTURALLY DEPRIVED YOUTH IN NEW YORK CITY.

    ERIC Educational Resources Information Center

    KARPAS, MELVIN R.

    THE TWO PROGRAMS REVIEWED ARE THE DEMONSTRATION GUIDANCE PROJECT AND HIGHER HORIZONS PROGRAM. CHARACTERISTICS OF THE DEMONSTRATION GUIDANCE PROJECT INCLUDED EXTRA TEACHERS, SPECIAL TUTORING, GROUP AND INDIVIDUAL GUIDANCE AND COUNSELING, CLINICAL SERVICES, INTENSIVE COURSES IN ENGLISH, CULTURAL, AND ARTISTIC EVENTS. THE PROJECT STARTED WITH JUNIOR…

  11. Upgrade of U.S. EPA's Experimental Stream Facility Supervisory Control and Data Acquisition System

    EPA Science Inventory

    The Supervisory control and data acquisition (SCADA) system for the U.S. EPA’s Experimental Stream Facility (ESF) was upgraded using Camile hardware and software in 2015. The upgrade added additional hardwired connections, new wireless capabilities, and included a complete rewrit...

  12. Status of the Short-Pulse X-ray Project at the Advanced Photon Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nassiri, A; Berenc, T G; Borland, M

    2012-07-01

    The Advanced Photon Source Upgrade (APS-U) Project at Argonne will include generation of short-pulse x-rays based on Zholents deflecting cavity scheme. We have chosen superconducting (SC) cavities in order to have a continuous train of crabbed bunches and flexibility of operating modes. In collaboration with Jefferson Laboratory, we are prototyping and testing a number of single-cell deflecting cavities and associated auxiliary systems with promising initial results. In collaboration with Lawrence Berkeley National Laboratory, we are working to develop state-of-the-art timing, synchronization, and differential rf phase stability systems that are required for SPX. Collaboration with Advanced Computations Department at Stanford Linearmore » Accelerator Center is looking into simulations of complex, multi-cavity geometries with lower- and higher-order modes waveguide dampers using ACE3P. This contribution provides the current R&D status of the SPX project.« less

  13. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hays, W.H.

    1998-08-12

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests andmore » inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.« less

  14. Functional and performance requirements of the next NOAA-Kasas City computer system

    NASA Technical Reports Server (NTRS)

    Mosher, F. R.

    1985-01-01

    The development of the Advanced Weather Interactive Processing System for the 1990's (AWIPS-90) will result in more timely and accurate forecasts with improved cost effectiveness. As part of the AWIPS-90 initiative, the National Meteorological Center (NMC), the National Severe Storms Forecast Center (NSSFC), and the National Hurricane Center (NHC) are to receive upgrades of interactive processing systems. This National Center Upgrade program will support the specialized inter-center communications, data acquisition, and processing needs of these centers. The missions, current capabilities and general functional requirements for the upgrade to the NSSFC are addressed. System capabilities are discussed along with the requirements for the upgraded system.

  15. Strategies for Meeting Correctional Training and Manpower Needs, Four Developmental Projects.

    ERIC Educational Resources Information Center

    Law Enforcement Assistance Administration (Dept. of Justice), Washington, DC.

    The Law Enforcement Education Act of 1965 has placed special emphasis on projects involving training and utilization of correctional manpower. The four representative projects reported here give a comprehensive view of the problems of upgrading correctional staff and possible solutions to those problems: (1) "The Developmental Laboratory for…

  16. Timing and tracking for the Crystal Barrel detector

    NASA Astrophysics Data System (ADS)

    Beck, Reinhard; Brinkmann, Kai; Novotny, Rainer

    2017-01-01

    The aim of the project D.3 is the upgrade of several detector components used in the CBELSA/TAPS experiment at ELSA. The readout of the Crystal Barrel Calorimeter will be extended by a timing branch in order to gain trigger capability for the detector, which will allow to measure completely neutral final states in photoproduction reactions (see projects A.1 and C.5). Additionally, the readout of the inner crystals of the TAPS detector, which covers the forward opening of the Crystal Barrel Calorimeter, will be modified to be capable of high event rates due to the intensity upgrade of ELSA. Furthermore, a full-scale prototype Time Projection Chamber (TPC) has been built to be used as a new central tracker for the CBELSA/TAPS experiment at ELSA and the FOPI experiment at GSI.

  17. Environmental Control Systems for Exploration Missions One and Two

    NASA Technical Reports Server (NTRS)

    Falcone, Mark A.

    2017-01-01

    In preparing for Exploration Missions One and Two (EM-1 & EM-2), the Ground Systems Development and Operations Program has significant updates to be made to nearly all facilities. This is all being done to accommodate the Space Launch System, which will be the world’s largest rocket in history upon fruition. Facilitating the launch of such a rocket requires an updated Vehicle Assembly Building, an upgraded Launchpad, Payload Processing Facility, and more. In this project, Environmental Control Systems across several facilities were involved, though there is a focus around the Mobile Launcher and Launchpad. Parts were ordered, analysis models were updated, design drawings were updated, and more.

  18. 2016 Earth System Grid Federation Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Dean N.

    The Earth System Grid Federation (ESGF) experienced a major setback in June 2015, when it experienced a security incident that brought all systems to a halt for more than half a year. However, federation developers and management committee members turned the incident into an opportunity to dramatically upgrade the system security and functionality and to develop planning and policy documents to guide ESGF evolution and success. Moreover, despite the incident, ESGF developer working teams continue to make strong and significant progress on various enhancement projects that will help ensure ESGF can meet the needs of the climate community in themore » coming years.« less

  19. HIDEC F-15 adaptive engine control system flight test results

    NASA Technical Reports Server (NTRS)

    Smolka, James W.

    1987-01-01

    NASA-Ames' Highly Integrated Digital Electronic Control (HIDEC) flight test program aims to develop fully integrated airframe, propulsion, and flight control systems. The HIDEC F-15 adaptive engine control system flight test program has demonstrated that significant performance improvements are obtainable through the retention of stall-free engine operation throughout the aircraft flight and maneuver envelopes. The greatest thrust increase was projected for the medium-to-high altitude flight regime at subsonic speed which is of such importance to air combat. Adaptive engine control systems such as the HIDEC F-15's can be used to upgrade the performance of existing aircraft without resort to expensive reengining programs.

  20. Coquina Elementary students enjoy gift of computers

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Children at Coquina Elementary School, Titusville, Fla., 'practice' using a computer keyboard, part of equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. Ksc employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated.

  1. Coquina Elementary students enjoy gift of computers

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Children at Coquina Elementary School, Titusville, Fla., look with curiosity at the wrapped computer equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. Ksc employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated.

  2. KSC-99pp1225

    NASA Image and Video Library

    1999-10-06

    Children at Coquina Elementary School, Titusville, Fla., excitedly tear into the wrapped computer equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. KSC employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated

  3. Audubon Elementary students enjoy gift of computers

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Children at Audubon Elementary School, Merritt Island, Fla., eagerly unwrap computer equipment donated by Kennedy Space Center. Audubon is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year- long project. Ksc employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated.

  4. KSC-99pp1224

    NASA Image and Video Library

    1999-10-06

    Children at Coquina Elementary School, Titusville, Fla., eagerly tear into the wrapped computer equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. KSC employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated

  5. KSC-99pp1222

    NASA Image and Video Library

    1999-10-06

    Children at Coquina Elementary School, Titusville, Fla., look with curiosity at the wrapped computer equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. KSC employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated

  6. KSC-99pp1223

    NASA Image and Video Library

    1999-10-06

    Children at Coquina Elementary School, Titusville, Fla., "practice" using a computer keyboard, part of equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. KSC employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated

  7. Coquina Elementary students enjoy gift of computers

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Children at Coquina Elementary School, Titusville, Fla., eagerly tear into the wrapped computer equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year- long project. Ksc employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated.

  8. Coquina Elementary students enjoy gift of computers

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Children at Coquina Elementary School, Titusville, Fla., excitedly tear into the wrapped computer equipment donated by Kennedy Space Center. Coquina is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. Ksc employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated.

  9. Upgrading Supply Chain Management Systems to Improve Availability of Medicines in Tanzania: Evaluation of Performance and Cost Effects

    PubMed Central

    Mwencha, Marasi; Rosen, James E; Spisak, Cary; Watson, Noel; Kisoka, Noela; Mberesero, Happiness

    2017-01-01

    ABSTRACT Background: To address challenges in public health supply chain performance, Tanzania invested in a national logistics management unit (LMU) and a national electronic logistics management information system (eLMIS). This evaluation examined the impact of those 2 key management upgrades approximately 1 year after they were introduced. Methods: We used a nonexperimental pre-post study design to compare the previous system with the upgraded management system. We collected baseline data from August to November 2013. We conducted round 1 of post-implementation data collection during April and May 2015, about 1 year after implementation of the upgrades. We evaluated key indicators of data use and reporting; supply chain management practices such as storage and supervision; supply chain performance including stock-out and expiry rates; and supply chain cost and savings. We analyzed the data using a range of techniques including statistical testing of baseline and round-1 results, and cost, cost-effectiveness, and return on investment analysis. Results: The upgrades were associated with improvements in data use, accessibility, visibility, and transparency; planning, control, and monitoring; support for quantification; stock-out rates; stock-out duration; commodity expiry; and forecast error. The upgraded system was more costly, but it was also more efficient, particularly when adjusting for the performance improvements. The upgrades also generated substantial savings that defrayed some, but not all, of the investment costs. Conclusion: Upgrades to Tanzania's supply chain management systems created multiple and complex pathways to impact. One year after implementation, the LMU and eLMIS brought about performance improvements through better data use and through improvements in some, but not all, management practices. Furthermore, the upgrades—while not inexpensive—contributed to greater system efficiency and modest savings. PMID:28877933

  10. Technology and Advanced Development for a Non-Toxic Orbital Maneuvering System and Reaction Control System for Orbiter Upgrade

    NASA Technical Reports Server (NTRS)

    Hayes, W. A.; Ferrante, Fred A.; Engelmann, G. L.; Gibson, V. A.; Phillipsen, P. C.

    1999-01-01

    NASA intends to pursue technology applications to upgrade the Space Shuttle Orbiter OMS and RCS systems with non-toxic propellants. The primary objectives of an upgraded OMS/RCS are improved safety and reliability, reduced operations and maintenance costs while meeting basic OMS/RCS operational and performance requirements. The OMS/RCS has a high degree of direct interaction with the crew and requires subsystem and components that are compatible with integration into the orbiter vehicle with regard to external mold-line, power and thermal control The non-toxic propulsion technology is also applicable to future Human Exploration and Development of Space (HEDS) missions. The HEDS missions have similar requirements for attitude control and lander descent/ascent propulsion and which will emphasize the use of In-Situ Resource for propellants. When used as a regenerative coolant as in the Shuttle Orbiter OMS combustion chamber, non-toxic fuels such as ethanol are limited in their cooling capacity by the bulk temperature rise permitted to prevent film boiling or possible coking. Typical regeneratively cooled chambers are constructed from highly conductive copper, which maximizes heat transfer, or from low conductivity materials like stainless steel that can also exacerbate cooling problems. For an ethanol cooled application the heat transfer into the fluid must be controlled to reduce the fuel coolant bulk temperature rise. An approach to provide this control is the subject of this report. This report is being issued to document work done by Aerojet on NASA contract NAS 8-98042. Specifically, this project investigates of the use of ethanol, a designated non-toxic fuel, as a coolant for the Space Shuttle Orbital Maneuvering System Engine combustion chamber. The project also addresses a cost reducing fabrication technique for construction of such a combustion chamber. The study contained three major sub-tasks: an analytical investigation and trade study which included layout of a flight type chamber concept, the fabrication and evaluation of formed platelet liner panels and the preparation and testing of mechanical properties specimens representative of a novel hot gas wall concept.

  11. An application of the Multi-Purpose System Simulation /MPSS/ model to the Monitor and Control Display System /MACDS/ at the National Aeronautics and Space Administration /NASA/ Goddard Space Flight Center /GSFC/

    NASA Technical Reports Server (NTRS)

    Mill, F. W.; Krebs, G. N.; Strauss, E. S.

    1976-01-01

    The Multi-Purpose System Simulator (MPSS) model was used to investigate the current and projected performance of the Monitor and Control Display System (MACDS) at the Goddard Space Flight Center in processing and displaying launch data adequately. MACDS consists of two interconnected mini-computers with associated terminal input and display output equipment and a disk-stored data base. Three configurations of MACDS were evaluated via MPSS and their performances ascertained. First, the current version of MACDS was found inadequate to handle projected launch data loads because of unacceptable data backlogging. Second, the current MACDS hardware with enhanced software was capable of handling two times the anticipated data loads. Third, an up-graded hardware ensemble combined with the enhanced software was capable of handling four times the anticipated data loads.

  12. Ultrasonic Stir Welding Development for Ground-Based and In Situ Fabrication and Repair for In-Space Propulsion Systems/Commercial Space Sector

    NASA Technical Reports Server (NTRS)

    Ding, Jeff

    2015-01-01

    The completed Center Innovation Fund (CIF) project used the upgraded Ultrasonic Stir Weld (USW) Prototype System (built in 2013/2014) to begin characterizing the weld process using 2219 aluminum (fig. 1). This work is being done in Bldg. 4755 at NASA Marshall Space Flight Center (MSFC). The capabilities of the USW system provides the means to precisely control and document individual welding parameters. The current upgraded system has the following capabilities: (1) Ability to 'pulse' ultrasonic (US) energy on and off and adjust parameters real-time (travel speed, spindle rpm, US amplitude, X and Z axis positions, and plunge and pin axis force; (2) Means to measure draw force; (3) Ability to record US power versus time; (4) Increasing stiffness of Z axis drive and reduce head deflection using laser technology; (5) Adding linear encoder to better control tool penetration setting; (6) Ultrasonic energy integrated into stir rod and containment plate; (7) Maximum 600 rpm; (8) Maximum Z force 15,000 lb; (9) Real-time data acquisition and logging capabilities at a minimum frequency of 10 Hz; and (10) Two separate transducer power supplies operating at 4.5 kW power.

  13. Management of Water Quality Data Within the Corps of Engineers, 1979.

    DTIC Science & Technology

    1980-12-01

    integrated data base systems have been in the business area. SIR was developed for scientific researchers. 3. An evaluation of the system is as follows. a...of the UPGRADE system. 3. An evaluation of the system is as follows. a. Advanatges : (1) Anyone who understands the data and principles of anal- ysis...A BASIC UNDERSTANDING OF THE STRUCTURE OF THE UPGRADE SYSTEM START SINRTCOMPUTER ECET IE.ECUTE UPGRADE IA IDN IFY ERINAL TYPE SELECTION OF OPERATIONAL

  14. Data-Based Performance Assessments for the DOE Hydropower Advancement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    March, Patrick; Wolff, Dr. Paul; Smith, Brennan T

    2012-01-01

    The U. S. Department of Energy s Hydropower Advancement Project (HAP) was initiated to characterize and trend hydropower asset conditions across the U.S.A. s existing hydropower fleet and to identify and evaluate the upgrading opportunities. Although HAP includes both detailed performance assessments and condition assessments of existing hydropower plants, this paper focuses on the performance assessments. Plant performance assessments provide a set of statistics and indices that characterize the historical extent to which each plant has converted the potential energy at a site into electrical energy for the power system. The performance metrics enable benchmarking and trending of performance acrossmore » many projects in a variety contexts (e.g., river systems, power systems, and water availability). During FY2011 and FY2012, assessments will be performed on ten plants, with an additional fifty plants scheduled for FY2013. This paper focuses on the performance assessments completed to date, details the performance assessment process, and describes results from the performance assessments.« less

  15. High-Tech 'Heart' of New-Generation Radio Telescope Passes First Test

    NASA Astrophysics Data System (ADS)

    2008-08-01

    The Expanded Very Large Array (EVLA), part of the National Radio Astronomy Observatory (NRAO), took a giant step toward completion on August 7 with successful testing of advanced digital hardware designed to combine signals from its upgraded radio-telescope antennas to produce high resolution images of celestial objects. Successful Moment NRAO Crew Views Successful Computer Display Of WIDAR "First Fringes" Seated, front to back: Barry Clark, Ken Sowinski, Michael Rupen, Kevin Ryan. Standing, front to rear: Mark McKinnon, Rick Perley, Hichem Ben Frej. CREDIT: Dave Finley, NRAO/AUI/NSF Click on image for larger file. By upgrading the 1970s-era electronics of its original Very Large Array (VLA), NRAO is creating a major new radio telescope that is ten times more sensitive than before. Using the EVLA, astronomers will observe fainter and more-distant objects than previously possible and use vastly improved analysis tools to decipher their physics. The heart of the new electronics that makes this transformation possible is a high-performance, special-purpose supercomputer, called the WIDAR Correlator. It has been designed and is being built by the National Research Council of Canada at the Dominion Radio Astrophysical Observatory (DRAO) of the Herzberg Institute for Astrophysics, and serves as Canada's contribution to the EVLA project. The design of the correlator incorporates an NRC-patented new digital electronic architecture. The successful test, at the VLA site 50 miles west of Socorro, New Mexico, used prototype correlator electronics to combine the signals from two upgraded VLA antennas to turn them into a single, high-resolution telescope system, called an interferometer. The technical term for this achievement is called "first fringes." Each upgraded EVLA antenna produces 100 times more data than an original VLA antenna. When all 27 antennas are upgraded, they will pump data into the WIDAR correlator at a rate equal to 48 million digital telephone calls. To process this torrent of data, the correlator will make 10 million billion calculations per second. Powerful, multi-antenna imaging radio-telescope systems use pairs of antennas as their basic building blocks. Each of the VLA's 27 giant dish antennas is combined electronically with every other antenna to form a multitude of pairs. Each pair contributes unique information that is used to build a highly-detailed image of some astronomical object. The successful two-antenna test thus verifies the design of the new correlator. "This achievement marks the first time that the complete chain of electronics for the EVLA has worked together, and represents a huge milestone in the project. Our congratulations go to our Canadian colleagues and to the NRAO staff members participating in this project. This is a job well done," said Fred Lo, Director of the National Radio Astronomy Observatory. The VLA Expansion, a ten-year project approved in 2001, is funded by 55 million from the United States National Science Foundation (NSF) and 1.75 million from the Mexican government. The Canadian correlator represents a contribution of about $17 million to the project. Throughout the project, the VLA has continued to operate, using a mix of the old and new-style antennas to provide an ongoing research tool. Over its lifetime, the VLA has been the most scientifically-productive ground-based telescope in the history of astronomy. When completed in 2012, the EVLA will be the most powerful centimeter-wavelength radio telescope in the world. The technology developed for the EVLA will enable progress on the next generation radio telescope called the Square Kilometer Array (SKA). The National Radio Astronomy Observatory is a facility of the National Science Foundation, operated under cooperative agreement by Associated Universities, Inc. Plots of amplitude (top) and phase (bottom) from WIDAR correlator "first fringes" on August 7, 2008.

  16. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    NASA Astrophysics Data System (ADS)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  17. Research and Support for MTLS Data Management and Visualization

    DOT National Transportation Integrated Search

    2016-09-30

    This report documents the research project "Research and Support for MTLS Data Management and Visualization." The primary goal of the project was to support Caltrans District 4 in their upgrade and enhancement efforts for Mobile Terrestrial Laser Sca...

  18. Upgraded demonstration vehicle task report

    NASA Technical Reports Server (NTRS)

    Bryant, J.; Hardy, K.; Livingston, R.; Sandberg, J.

    1981-01-01

    Vehicle/battery performance capabilities and interface problems that occurred when upgraded developmental batteries were integrated with upgraded versions of comercially available electric vehicles were investigated. Developmental batteries used included nickel zinc batteries, a nickel iron battery, and an improved lead acid battery. Testing of the electric vehicles and upgraded batteries was performed in the complete vehicle system environment to characterize performance and identify problems unique to the vehicle/battery system. Constant speed tests and driving schedule range tests were performed on a chassis dynamometer. The results from these tests of the upgraded batteries and vehicles were compared to performance capabilities for the same vehicles equipped with standard batteries.

  19. Extending the International Space Station Life and Operability

    NASA Technical Reports Server (NTRS)

    Cecil, Andrew J.; Pitts, R. Lee; Sparks, Ray N.; Wickline, Thomas W.; Zoller, David A.

    2012-01-01

    The International Space Station (ISS) is in an operational configuration with final assembly complete. To fully utilize ISS and extend the operational life, it became necessary to upgrade and extend the onboard systems with the Obsolescence Driven Avionics Redesign (ODAR) project. ODAR enabled a joint project between the Johnson Space Center (JSC) and Marshall Space Flight Center (MSFC) focused on upgrading the onboard payload and Ku-Band systems, expanding the voice and video capabilities, and including more modern protocols allowing unprecedented access for payload investigators to their on-orbit payloads. The MSFC Huntsville Operations Support Center (HOSC) was tasked with developing a high-rate enhanced Functionally Distributed Processor (eFDP) to handle 300Mbps Return Link data, double the legacy rate, and incorporate a Line Outage Recorder (LOR). The eFDP also provides a 25Mbps uplink transmission rate with a Space Link Extension (SLE) interface. HOSC also updated the Payload Data Services System (PDSS) to incorporate the latest Consultative Committee for Space Data Systems (CCSDS) protocols, most notably the use of the Internet Protocol (IP) Encapsulation, in addition to the legacy capabilities. The Central Command Processor was also updated to interact with the new onboard and ground capabilities of Mission Control Center -- Houston (MCC-H) for the uplink functionality. The architecture, implementation, and lessons learned, including integration and incorporation of Commercial Off The Shelf (COTS) hardware and software into the operational mission of the ISS, is described herein. The applicability of this new technology provides new benefits to ISS payload users and ensures better utilization of the ISS by the science community

  20. Estimation of Airline Benefits from Avionics Upgrade under Preferential Merge Re-sequence Scheduling

    NASA Technical Reports Server (NTRS)

    Kotegawa, Tatsuya; Cayabyab, Charlene Anne; Almog, Noam

    2013-01-01

    Modernization of the airline fleet avionics is essential to fully enable future technologies and procedures for increasing national airspace system capacity. However in the current national airspace system, system-wide benefits gained by avionics upgrade are not fully directed to aircraft/airlines that upgrade, resulting in slow fleet modernization rate. Preferential merge re-sequence scheduling is a best-equipped-best-served concept designed to incentivize avionics upgrade among airlines by allowing aircraft with new avionics (high-equipped) to be re-sequenced ahead of aircraft without the upgrades (low-equipped) at enroute merge waypoints. The goal of this study is to investigate the potential benefits gained or lost by airlines under a high or low-equipped fleet scenario if preferential merge resequence scheduling is implemented.

  1. Research Plan of the Department of Systems Engineering and the Operations Research Center for Academic Year 2007

    DTIC Science & Technology

    2006-10-01

    high probability for success. Estimated Time to Complete: 31 May 2007. 4. Support and Upgrade of Armed Forces-CARES to integrate Chaplin ...Excellence (ORCEN) is to provide a small, full- time analytical capability to both the Academy and the United States Army and the Department of...complete significant research projects in this time as they usually require little train-up as they are exposed to many military and academic

  2. Turn Basin Construction

    NASA Image and Video Library

    2017-06-30

    At NASA's Kennedy Space Center in Florida, cement is poured as part of a construction project to upgrade the turn basin wharf. The work includes driving multiple precast concrete piles to a depth of about 70 feet to accommodate arrival of the core stage for the agency's Space Launch System (SLS) rocket. When the stage for NASA's SLS departs the Michoud Assembly Facility in New Orleans, it will be shipped by the agency's modified barge to the Launch Complex 39 turn basin.

  3. Environmental Assessment for the Maintenance, Upgrade, and Construction of the Jet Fuel Distribution System, Edwards Air Force Base, California

    DTIC Science & Technology

    2009-01-01

    5c. PROGRAM ELEMENT NUMBER 6. AUTHOR (S) 5d. PROJECT NUMBER 5e. TASK NUMBER EIAP Control No. 07-0485 5f. WORK UNIT NUMBER 7. PERFORMING...chemical hazards such as fuel vapors, heavy metal paints, and asbestos particulates; venomous snakes; and potential exposure to hantavirus or valley...OCCUPATIONAL HEALTH Environmental hazards Personnel could be exposed to heat stress, venomous snakes, hantavirus from infected rodents, and valley

  4. VLT interferometer upgrade for the 2nd generation of interferometric instruments

    NASA Astrophysics Data System (ADS)

    Gonté, Frederic; Woillez, Julien; Schuhler, Nicolas; Egner, Sebastian; Merand, Antoine; Abad, José Antonio; Abadie, Sergio; Abuter, Roberto; Acuña, Margarita; Allouche, Fatmé; Alonso, Jaime; Andolfalto, Luigi; Antonelli, Pierre; Avila, Gerardo; Barriga, Pablo José; Beltran, Juan; Berger, Jean-Philippe; Bolados, Carlos; Bonnet, Henri; Bourget, Pierre; Brast, Roland; Bristow, Paul; Caniguante, Luis; Castillo, Roberto; Conzelmann, Ralf; Cortes, Angela; Delplancke, Françoise; Del Valle, Diego; Derie, Frederic; Diaz, Alvaro; Donoso, Reinaldo; Dorn, Reinhold; Duhoux, Philippe; Dupuy, Christophe; Eisenhauer, Frank; Elao, Christian; Fuenteseca, Eloy; Fernandez, Ruben; Gaytan, Daniel; Glindemann, Andreas; Gonzales, Jaime; Guieu, Sylvain; Guisard, Stephane; Haguenauer, Pierre; Haimerl, Andreas; Heinz, Volker; Henriquez, Juan Pablo; van der Heyden, P.; Hubin, Norbert; Huerta, Rodrigo; Jochum, Lieselotte; Leiva, Alfredo; Lévêque, Samuel; Lizon, Jean-Louis; Luco, Fernando; Mardones, Pedro; Mellado, Angel; Osorio, Juan; Ott, Jürgen; Pallanca, Laurent; Pavez, Marcus; Pasquini, Luca; Percheron, Isabelle; Pirard, Jean-Francois; Than Phan, Duc; Pineda, Juan Carlos; Pino, Andres; Poupar, Sebastien; Ramírez, Andres; Reinero, Claudio; Riquelme, Miguel; Romero, Juan; Rivinius, Thomas; Rojas, Chester; Rozas, Felix; Salgado, Fernando; Scheithauer, Silvia; Schmid, Christian; Schöller, Markus; Siclari, Waldo; Stephan, Christian; Tamblay, Richard; Tapia, Mario; Tristram, Konrad; Valdes, Guillermo; de Wit, Willem-Jan; Wright, Andrew; Zins, Gerard

    2016-08-01

    ESO is undertaking a large upgrade of the infrastructure on Cerro Paranal in order to integrate the 2nd generation of interferometric instruments Gravity and MATISSE, and increase its performance. This upgrade started mid 2014 with the construction of a service station for the Auxiliary Telescopes and will end with the implementation of the adaptive optics system for the Auxiliary telescope (NAOMI) in 2018. This upgrade has an impact on the infrastructure of the VLTI, as well as its sub-systems and scientific instruments.

  5. The systems engineering upgrade intiative at NASA's Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    Jones, Ross M.

    2005-01-01

    JPL is implementing an initiative to significantly upgrade our systems engineering capabilities. This Systems Engineering Upgrade Initiative [SUI] has been authorized by the highest level technical management body of JPL and is sponsored with internal funds. The SUI objective is to upgrade system engineering at JPL to a level that is world class, professional and efficient compared to the FY04/05 baseline. JPL system engineering, along with the other engineering disciplines, is intended to support optimum designs; controlled and efficient implementations; and high quality, reliable, cost effective products. SUI technical activities are categorized into those dealing with people, process and tools. The purpose of this paper is to describe the rationale, objectives/plans and current status of the JPL SUI.

  6. Variability and uncertainty in life cycle assessment models for greenhouse gas emissions from Canadian oil sands production.

    PubMed

    Brandt, Adam R

    2012-01-17

    Because of interest in greenhouse gas (GHG) emissions from transportation fuels production, a number of recent life cycle assessment (LCA) studies have calculated GHG emissions from oil sands extraction, upgrading, and refining pathways. The results from these studies vary considerably. This paper reviews factors affecting energy consumption and GHG emissions from oil sands extraction. It then uses publicly available data to analyze the assumptions made in the LCA models to better understand the causes of variability in emissions estimates. It is found that the variation in oil sands GHG estimates is due to a variety of causes. In approximate order of importance, these are scope of modeling and choice of projects analyzed (e.g., specific projects vs industry averages); differences in assumed energy intensities of extraction and upgrading; differences in the fuel mix assumptions; treatment of secondary noncombustion emissions sources, such as venting, flaring, and fugitive emissions; and treatment of ecological emissions sources, such as land-use change-associated emissions. The GHGenius model is recommended as the LCA model that is most congruent with reported industry average data. GHGenius also has the most comprehensive system boundaries. Last, remaining uncertainties and future research needs are discussed.

  7. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Industrial Physics.

    ERIC Educational Resources Information Center

    Whisenhunt, James E.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour introduction to industrial physics that explains and demonstrates to industrial maintenance mechanics the direct relationship of physics to machinery. Project TEAM is intended to upgrade basic technical competencies of…

  8. 13 CFR 120.931 - 504 Lending limits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... energy consumption by at least 10%; or (3) Plant, equipment and process upgrades of renewable energy... loan proceeds will not be directed towards a Project in paragraph (c) of this section, (b) An... goals enumerated in § 120.862(b) applies to the Project; and (c) $5,500,000 for each Project for: (1...

  9. 13 CFR 120.931 - 504 Lending limits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... energy consumption by at least 10%; or (3) Plant, equipment and process upgrades of renewable energy... loan proceeds will not be directed towards a Project in paragraph (c) of this section, (b) An... goals enumerated in § 120.862(b) applies to the Project; and (c) $5,500,000 for each Project for: (1...

  10. 13 CFR 120.931 - 504 Lending limits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... energy consumption by at least 10%; or (3) Plant, equipment and process upgrades of renewable energy... loan proceeds will not be directed towards a Project in paragraph (c) of this section, (b) An... goals enumerated in § 120.862(b) applies to the Project; and (c) $5,500,000 for each Project for: (1...

  11. UTDallas Offline Computing System for B Physics with the Babar Experiment at SLAC

    NASA Astrophysics Data System (ADS)

    Benninger, Tracy L.

    1998-10-01

    The University of Texas at Dallas High Energy Physics group is building a high performance, large storage computing system for B physics research with the BaBar experiment (``factory'') at the Stanford Linear Accelerator Center. The goal of this system is to analyze one terabyte of complex Event Store data from BaBar in one to two days. The foundation of the computing system is a Sun E6000 Enterprise multiprocessor system, with additions of a Sun StorEdge L1800 Tape Library, a Sun Workstation for processing batch jobs, staging disks and interface cards. The design considerations, current status, projects underway, and possible upgrade paths will be discussed.

  12. New Fast Beam Conditions Monitoring (BCM1F) system for CMS

    NASA Astrophysics Data System (ADS)

    Zagozdzinska, A. A.; Bell, A. J.; Dabrowski, A. E.; Hempel, M.; Henschel, H. M.; Karacheban, O.; Przyborowski, D.; Leonard, J. L.; Penno, M.; Pozniak, K. T.; Miraglia, M.; Lange, W.; Lohmann, W.; Ryjov, V.; Lokhovitskiy, A.; Stickland, D.; Walsh, R.

    2016-01-01

    The CMS Beam Radiation Instrumentation and Luminosity (BRIL) project is composed of several systems providing the experiment protection from adverse beam conditions while also measuring the online luminosity and beam background. Although the readout bandwidth of the Fast Beam Conditions Monitoring system (BCM1F—one of the faster monitoring systems of the CMS BRIL), was sufficient for the initial LHC conditions, the foreseen enhancement of the beams parameters after the LHC Long Shutdown-1 (LS1) imposed the upgrade of the system. This paper presents the new BCM1F, which is designed to provide real-time fast diagnosis of beam conditions and instantaneous luminosity with readout able to resolve the 25 ns bunch structure.

  13. Renewable Energy in Rural Southeastern Arizona: Decision Factors: A Comparison of the Consumer Profiles of Homeowners Who Purchased Renewable Energy Systems With Those Who Performed Other Home Upgrades or Remodeling Projects

    NASA Astrophysics Data System (ADS)

    Porter, Wayne Eliot

    Arizona has an abundant solar resource and technologically mature systems are available to capture it, but solar energy systems are still considered to be an innovative technology. Adoption rates for solar and wind energy systems rise and fall with the political tides, and are relatively low in most rural areas in Arizona. This thesis tests the hypothesis that a consumer profile developed to characterize the adopters of renewable energy technology (RET) systems in rural Arizona is the same as the profile of other area residents who performed renovations, upgrades or additions to their homes. Residents of Santa Cruz and Cochise Counties who had obtained building permits to either install a solar or wind energy system or to perform a substantial renovation or upgrade to their home were surveyed to gather demographic, psychographic and behavioristic data. The data from 133 survey responses (76 from RET adopters and 57 from non-adopters) provided insights about their decisions regarding whether or not to adopt a RET system. The results, which are statistically significant at the 99% level of confidence, indicate that RET adopters had smaller households, were older and had higher education levels and greater income levels than the non-adopters. The research also provides answers to three related questions: First, are the energy conservation habits of RET adopters the same as those of non-adopters? Second, what were the sources of information consulted and the most important factors that motivated the decision to purchase a solar or wind energy system? And finally, are any of the factors which influenced the decision to live in a rural area in southeastern Arizona related to the decision to purchase a renewable energy system? The answers are provided, along with a series of recommendations that are designed to inform marketers and other promoters of RETs about how to utilize these results to help achieve their goals.

  14. 25 CFR 175.40 - Financing of extensions and upgrades.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Financing of extensions and upgrades. 175.40 Section 175.40 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN ELECTRIC POWER UTILITIES System Extensions and Upgrades § 175.40 Financing of extensions and upgrades. (a) The utility may...

  15. Correlation electron cyclotron emission diagnostic and improved calculation of turbulent temperature fluctuation levels on ASDEX Upgrade

    NASA Astrophysics Data System (ADS)

    Creely, A. J.; Freethy, S. J.; Burke, W. M.; Conway, G. D.; Leccacorvi, R.; Parkin, W. C.; Terry, D. R.; White, A. E.

    2018-05-01

    A newly upgraded correlation electron cyclotron emission (CECE) diagnostic has been installed on the ASDEX Upgrade tokamak and has begun to perform experimental measurements of electron temperature fluctuations. CECE diagnostics measure small amplitude electron temperature fluctuations by correlating closely spaced heterodyne radiometer channels. This upgrade expanded the system from six channels to thirty, allowing simultaneous measurement of fluctuation level radial profiles without repeat discharges, as well as opening up the possibility of measuring radial turbulent correlation lengths. Newly refined statistical techniques have been developed in order to accurately analyze the fluctuation data collected from the CECE system. This paper presents the hardware upgrades for this system and the analysis techniques used to interpret the raw data, as well as measurements of fluctuation spectra and fluctuation level radial profiles.

  16. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting inmore » equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. KPS and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on field site selection. ChevronTexaco has nominated their Headlee Gas Plant in Odessa, TX for a commercial-scale dehydration test. Potting and module materials testing were initiated. Preliminary design of the bench-scale equipment continues.« less

  17. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting inmore » equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on field site selection. ChevronTexaco has nominated their Headlee Gas Plant in Odessa, TX for a commercial-scale dehydration test. Design and cost estimation for this new site are underway. Potting and module materials testing continued. Preliminary design of the bench-scale equipment continues.« less

  18. HEC Applications on Columbia Project

    NASA Technical Reports Server (NTRS)

    Taft, Jim

    2004-01-01

    NASA's Columbia system consists of a cluster of twenty 512 processor SGI Altix systems. Each of these systems is 3 TFLOP/s in peak performance - approximately the same as the entire compute capability at NAS just one year ago. Each 512p system is a single system image machine with one Linunx O5, one high performance file system, and one globally shared memory. The NAS Terascale Applications Group (TAG) is chartered to assist in scaling NASA's mission critical codes to at least 512p in order to significantly improve emergency response during flight operations, as well as provide significant improvements in the codes. and rate of scientific discovery across the scientifc disciplines within NASA's Missions. Recent accomplishments are 4x improvements to codes in the ocean modeling community, 10x performance improvements in a number of computational fluid dynamics codes used in aero-vehicle design, and 5x improvements in a number of space science codes dealing in extreme physics. The TAG group will continue its scaling work to 2048p and beyond (10240 cpus) as the Columbia system becomes fully operational and the upgrades to the SGI NUMAlink memory fabric are in place. The NUMlink uprades dramatically improve system scalability for a single application. These upgrades will allow a number of codes to execute faster at higher fidelity than ever before on any other system, thus increasing the rate of scientific discovery even further

  19. Creating a competitive PSO: a case study.

    PubMed

    Calvaruso, J T

    1999-06-01

    Mount Carmel Health System, an integrated delivery system in Columbus, Ohio, became a Medicare+Choice contractor in response to unsatisfactory payment proposals from the Medicare contractors it serviced and to compete with the increasing number of managed care providers in its market. To meet HCFA's operational requirements, Mount Carmel upgraded and expanded its administrative and health information systems and solicited the support of its network physicians. It also developed a marketing strategy to promote its health plan. In the two years after instituting its provider-sponsored organization, Mount Carmel surpassed its original enrollment projections, decreased its patient management and utilization costs, and increased payments to its network members.

  20. Instructional image processing on a university mainframe: The Kansas system

    NASA Technical Reports Server (NTRS)

    Williams, T. H. L.; Siebert, J.; Gunn, C.

    1981-01-01

    An interactive digital image processing program package was developed that runs on the University of Kansas central computer, a Honeywell Level 66 multi-processor system. The module form of the package allows easy and rapid upgrades and extensions of the system and is used in remote sensing courses in the Department of Geography, in regional five-day short courses for academics and professionals, and also in remote sensing projects and research. The package comprises three self-contained modules of processing functions: Subimage extraction and rectification; image enhancement, preprocessing and data reduction; and classification. Its use in a typical course setting is described. Availability and costs are considered.

  1. GAS/LIQUID MEMBRANES FOR NATURAL GAS UPGRADING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard S. Meyer

    Gas Technology Institute (GTI) is conducting this research program whose objective is to develop gas/liquid membranes for natural gas upgrading to assist DOE in achieving their goal of developing novel methods of upgrading low quality natural gas to meet pipeline specifications. Kvaerner Process Systems (KPS) and W. L. Gore & Associates (GORE) gas/liquid membrane contactors are based on expanded polytetrafluoroethylene (ePTFE) membranes acting as the contacting barrier between the contaminated gas stream and the absorbing liquid. These resilient membranes provide much greater surface area for transfer than other tower internals, with packing densities five to ten times greater, resulting inmore » equipment 50-70% smaller and lower weight for the same treating service. The scope of the research program is to (1) build and install a laboratory- and a field-scale gas/liquid membrane absorber; (2) operate the units with a low quality natural gas feed stream for sufficient time to verify the simulation model of the contactors and to project membrane life in this severe service; and (3) conducted an economic evaluation, based on the data, to quantify the impact of the technology. Chevron, one of the major producers of natural gas, has offered to host the test at a gas treating plant. KPS will use their position as a recognized leader in the construction of commercial amine plants for building the unit along with GORE providing the membranes. GTI will provide operator and data collection support during lab- and field-testing to assure proper analytical procedures are used. Kvaerner and GTI will perform the final economic evaluation. GTI will provide project management and be responsible for reporting and interactions with DOE on this project. Efforts this quarter have concentrated on field site selection. ChevronTexaco has nominated their Headlee Gas Plant in Odessa, TX for a commercial-scale dehydration test. Design and cost estimation for this new site are underway. A HazOp review was conducted. Potting and module materials testing continued. Preliminary design of the bench-scale equipment continues. A status meeting was held in Morgantown, WV with the DOE Project Manager.« less

  2. Recent Upgrades and Extensions of the ASDEX Upgrade ECRH System

    NASA Astrophysics Data System (ADS)

    Wagner, Dietmar; Stober, Jörg; Leuterer, Fritz; Monaco, Francesco; Münich, Max; Schmid-Lorch, Dominik; Schütz, Harald; Zohm, Hartmut; Thumm, Manfred; Scherer, Theo; Meier, Andreas; Gantenbein, Gerd; Flamm, Jens; Kasparek, Walter; Höhnle, Hendrik; Lechte, Carsten; Litvak, Alexander G.; Denisov, Gregory G.; Chirkov, Alexey; Popov, Leonid G.; Nichiporenko, Vadim O.; Myasnikov, Vadim E.; Tai, Evgeny M.; Solyanova, Elena A.; Malygin, Sergey A.

    2011-03-01

    The multi-frequency Electron Cyclotron Heating (ECRH) system at the ASDEX Upgrade tokamak employs depressed collector gyrotrons, step-tunable in the range 105-140 GHz. The system is equipped with a fast steerable launcher allowing for remote steering of the ECRH RF beam during the plasma discharge. The gyrotrons and the mirrors are fully integrated in the discharge control system. The polarization can be controlled in a feed-forward mode. 3 Sniffer probes for millimeter wave stray radiation detection have been installed.

  3. KSC-99pp1226

    NASA Image and Video Library

    1999-10-06

    Nancy Nichols, principal of South Lake Elementary School, Titusville, Fla., joins students in teacher Michelle Butler's sixth grade class who are unwrapping computer equipment donated by Kennedy Space Center. South Lake is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. KSC employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated

  4. HMI conventions for process control graphics.

    PubMed

    Pikaar, Ruud N

    2012-01-01

    Process operators supervise and control complex processes. To enable the operator to do an adequate job, instrumentation and process control engineers need to address several related topics, such as console design, information design, navigation, and alarm management. In process control upgrade projects, usually a 1:1 conversion of existing graphics is proposed. This paper suggests another approach, efficiently leading to a reduced number of new powerful process graphics, supported by a permanent process overview displays. In addition a road map for structuring content (process information) and conventions for the presentation of objects, symbols, and so on, has been developed. The impact of the human factors engineering approach on process control upgrade projects is illustrated by several cases.

  5. Space Shuttle Projects

    NASA Image and Video Library

    2001-08-01

    This is the insignia of the STS-109 Space Shuttle mission. Carrying a crew of seven, the Space Shuttle Orbiter Columbia was launched with goals of maintenance and upgrades to the Hubble Space Telescope (HST). The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. The HST views galaxies, stars, planets, comets, possibly other solar systems, and even unusual phenomena such as quasars, with 10 times the clarity of ground-based telescopes. During the STS-109 mission, the telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm where four members of the crew performed five spacewalks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when it original coolant ran out. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 27th flight of the Orbiter Columbia and the 108th flight overall in NASA's Space Shuttle Program.

  6. DESIGN OF A TRAP GREASE UPGRADER FOR BIOFUEL PROCESSING - PHASE I

    EPA Science Inventory

    This project provides capstone senior design experience to several teams of engineering undergraduates at Drexel University through the technical and economic evaluation of a trap grease to biodiesel conversion process. The project incorporates two phases: Phase I characteri...

  7. EMR Database Upgrade from MUMPS to CACHE: Lessons Learned.

    PubMed

    Alotaibi, Abduallah; Emshary, Mshary; Househ, Mowafa

    2014-01-01

    Over the past few years, Saudi hospitals have been implementing and upgrading Electronic Medical Record Systems (EMRs) to ensure secure data transfer and exchange between EMRs.This paper focuses on the process and lessons learned in upgrading the MUMPS database to a the newer Caché database to ensure the integrity of electronic data transfer within a local Saudi hospital. This paper examines the steps taken by the departments concerned, their action plans and how the change process was managed. Results show that user satisfaction was achieved after the upgrade was completed. The system was stable and offered better healthcare quality to patients as a result of the data exchange. Hardware infrastructure upgrades improved scalability and software upgrades to Caché improved stability. The overall performance was enhanced and new functions were added (CPOE) during the upgrades. The essons learned were: 1) Involve higher management; 2) Research multiple solutions available in the market; 3) Plan for a variety of implementation scenarios.

  8. The Hubble Space Telescope servicing missions: Past, present, and future operational challenges

    NASA Technical Reports Server (NTRS)

    Ochs, William R.; Barbehenn, George M.; Crabb, William G.

    1996-01-01

    The Hubble Space Telescope was designed to be serviced by the Space Shuttle to upgrade systems, replace failed components and boost the telescope into higher orbits. There exists many operational challenges that must be addressed in preparation for the execution of a servicing mission, including technical and managerial issues. The operational challenges faced by the Hubble operations and ground system project for the support of the first servicing mission and future servicing missions, are considered. The emphasis is on those areas that helped ensure the success of the mission, including training, testing and contingency planning.

  9. Evaluation and utilization of beam simulation codes for the SNS ion source and low energy beam transport developmenta)

    NASA Astrophysics Data System (ADS)

    Han, B. X.; Welton, R. F.; Stockli, M. P.; Luciano, N. P.; Carmichael, J. R.

    2008-02-01

    Beam simulation codes PBGUNS, SIMION, and LORENTZ-3D were evaluated by modeling the well-diagnosed SNS base line ion source and low energy beam transport (LEBT) system. Then, an investigation was conducted using these codes to assist our ion source and LEBT development effort which is directed at meeting the SNS operational and also the power-upgrade project goals. A high-efficiency H- extraction system as well as magnetic and electrostatic LEBT configurations capable of transporting up to 100mA is studied using these simulation tools.

  10. Measures for diffusion of solar PV in selected African countries

    NASA Astrophysics Data System (ADS)

    Nygaard, Ivan; Hansen, Ulrich Elmer; Mackenzie, Gordon; Pedersen, Mathilde Brix

    2017-08-01

    This paper investigates how African governments are considering supporting and promoting the diffusion of solar PV. This issue is explored by examining so-called 'technology action plans (TAPs)', which were main outputs of the Technology Needs Assessment project implemented in 10 African countries from 2010 to 2013. The paper provides a review of three distinct but characteristic trajectories for PV market development in Kenya (private-led market for solar home systems), Morocco (utility-led fee-for service model) and Rwanda (donor-led market for institutional systems). The paper finds that governments' strategies to promoting solar PV are moving from isolated projects towards frameworks for market development and that there are high expectations to upgrading in the PV value chain through local assembly of panels and local production of other system elements. Commonly identified measures include support to: local production; financing schemes; tax exemptions; establishment and reinforcement of standards; technical training; and research and development.

  11. Replacing The Engine In Your Car While You Are Still Driving It [PowerPoint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bjorklund, Eric A.

    The scope of the project included the following: install new network backbone, replace 201 MHz rf tubes, replace low-level rf system, replace timing system, replace industrial I/O system, replace beam synchronous data acquisition system, replace fast protect reporting system, new wire scanner hardware, and new beam position/phase monitor hardware--all of this to be done while continuing to deliver beam to users. Lessons learned, for anyone contemplating a similarly ambitious upgrade: You can’t replace the whole system at once. Some compatibility must be maintained between the old and new systems. Always have a way to fall back. Have sympathy for themore » operations staff. You will be surprised.« less

  12. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-07

    Inside the Space Shuttle Columbia's cabin, astronaut Nancy J. Currie, mission specialist, controlled the Remote Manipulator System (RMS) on the crew cabin's aft flight deck to assist fellow astronauts during the STS-109 mission Extra Vehicular Activities (EVA). The RMS was used to capture the telescope and secure it into Columbia's cargo bay. The Space Shuttle Columbia STS-109 mission lifted off March 1, 2002 with goals of repairing and upgrading the Hubble Space Telescope (HST). The Marshall Space Flight Center in Huntsville, Alabama had the responsibility for the design, development, and construction of the HST, which is the most powerful and sophisticated telescope ever built. STS-109 upgrades to the HST included: replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.

  13. Component Database for the APS Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Veseli, S.; Arnold, N. D.; Jarosz, D. P.

    The Advanced Photon Source Upgrade (APS-U) project will replace the existing APS storage ring with a multi-bend achromat (MBA) lattice to provide extreme transverse coherence and extreme brightness x-rays to its users. As the time to replace the existing storage ring accelerator is of critical concern, an aggressive one-year removal/installation/testing period is being planned. To aid in the management of the thousands of components to be installed in such a short time, the Component Database (CDB) application is being developed with the purpose to identify, document, track, locate, and organize components in a central database. Three major domains are beingmore » addressed: Component definitions (which together make up an exhaustive "Component Catalog"), Designs (groupings of components to create subsystems), and Component Instances (“Inventory”). Relationships between the major domains offer additional "system knowledge" to be captured that will be leveraged with future tools and applications. It is imperative to provide sub-system engineers with a functional application early in the machine design cycle. Topics discussed in this paper include the initial design and deployment of CDB, as well as future development plans.« less

  14. Upgrade of JET AE Active Diagnostic for Low Frequency Eigenmodes Detection

    NASA Astrophysics Data System (ADS)

    Puglia, P.; Blanchard, P.; Testa, D.; Fasoli, A.; Aslanyan, V.; Porkolab, M.; Woskov, P.; Ruchko, L.; Galvao, R.; Pires de Sa, W.; Dos Reis, A.; Sharapov, S.; Dowson, S.,; Sheikh, H.; Blackman, T.; Jones, G.; Dorling, S.; Figueiredo, J.; Perez von Thun, C.; JET Collaboration

    2017-10-01

    The upgrade of the Toroidal Alfvén Eigenmode Active Antenna diagnostic at JET was commissioned last year. The new amplifiers have an operational frequency range limited to bands within 10-1000 kHz by a choice of filters. In the last campaigns the AE excitation system was operated on the Alfvénic range of frequencies (f > 80 kHz). For the next campaigns we are proposing operation on the frequency range of 25-50 kHz to excite eigenmodes on the Alfvén-acoustic range (GAMs, BAEs and Alfvén Cascades). The next JET campaigns will involve use of deuterium, tritium and hydrogen, giving a wide range of parameters for the modes to be investigated. Details of the system modifications for operation in this new frequency range and experimental scenarios will be discussed. This work has been carried out within the framework of the EUROfusion Consortium No 633053. Support was provided by the US DOE, FAPESP Project 2011/50773-0, by the Swiss NSF, and also the RCUK Energy Programme [Grant Number EP/P012450/1].

  15. Turn Basin Construction

    NASA Image and Video Library

    2017-06-30

    Across from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, cement trucks stand by to support a construction project to upgrade the turn basin wharf. The work includes driving multiple precast concrete piles to a depth of about 70 feet to accommodate arrival of the core stage for the agency's Space Launch System (SLS) rocket. When the stage for NASA's SLS departs the Michoud Assembly Facility in New Orleans, it will be shipped by the agency's modified barge to the Launch Complex 39 turn basin.

  16. Turn Basin Construction

    NASA Image and Video Library

    2017-06-30

    Across from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, cement is poured as part of a construction project to upgrade the turn basin wharf. The work includes driving multiple precast concrete piles to a depth of about 70 feet to accommodate arrival of the core stage for the agency's Space Launch System (SLS) rocket. When the stage for NASA's SLS departs the Michoud Assembly Facility in New Orleans, it will be shipped by the agency's modified barge to the Launch Complex 39 turn basin.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cresap, D.A.; Halverson, D.S.

    In the Fluorinel Dissolution Process (FDP) upgrade, excess hydrofluoric acid in the dissolver product must be complexed with aluminum nitrate (ANN) to eliminate corrosion concerns, adjusted with nitrate to facilitate extraction, and diluted with water to ensure solution stability. This is currently accomplished via batch processing in large vessels. However, to accommodate increases in projected throughput and reduce water production in a cost-effective manner, a semi-continuous system (In-line Complexing (ILC)) has been developed. The major conclusions drawn from tests demonstrating the feasibility of this concept are given in this report.

  18. Improved Thermal-Vacuum Compatible Flat Plate Radiometric Souce for System-Level Testing of Optical Sensors

    NASA Technical Reports Server (NTRS)

    Schwarz, Mark A.; Kent, Craig J.; Bousquet, Robert; Brown, Steven W.

    2015-01-01

    This work describes the development of an improved vacuum compatible flat plate radiometric source used for characterizing and calibrating remote optical sensors, in situ, throughout their testing period. The original flat plate radiometric source was developed for use by the VIIRS instrument during the NPOESS Preparatory Project (NPP). Following this effort, the FPI has had significant upgrades in order to improve both the radiometric throughput and uniformity. Results of the VIIRS testing with the reconfigured FPI are reported and discussed.

  19. Civilian Reuse of Former Military Bases. Summary of Completed Military Base Economic Adjustment Projects

    DTIC Science & Technology

    1990-06-01

    plants or for the expansion of existing firms. Services, explains that what attracted the company Reprinted with the permission of Area Develop- ment...upgrade the park’s appearance and to expand pany. Mr. Hayworth adds that the company had a water pressure for the plant sprinkler system. 26 difficult time...and Aviation Uses: Office indus- as the permanent staff for the Committee. trial parks or plants have been established at 75 of The EAC works with

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eckman, Todd J.; Hertzel, Ali K.; Lane, James J.

    In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligencemore » and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.« less

  1. Project One Hundred Thousand; Characteristics and Performance of "New Standards" Men. Description of Project One Hundred Thousand.

    ERIC Educational Resources Information Center

    Office of the Assistant Secretary of Defense for Manpower and Reserve Affairs (DOD), Washington, DC.

    Initiated in October 1966 by the Department of Defense, Project One Hundred Thousand accepts men who would not have qualified for military service under previous standards, and upgrades them medically and educationally. Major aims are to broaden opportunities for enlistment, equalize military service obligations, assure foresighted military…

  2. Q-Sync Motors in Commercial Refrigeration. Preliminary Test Results and Projected Benefits

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fricke, Brian A.; Becker, Bryan R.

    This report provides background information on various fractional-horsepower electric motor technologies, summarizes initial data from a DOE-sponsored Q-Sync motor demonstration project, and extrapolates that data to project the potential economic and environmental benefits resulting from upgrading the current installed base of 9–12 W evaporator fan motors to Q-Sync motors.

  3. Nabisco Foods Division--"New Indy" Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Ivy Tech State Coll., Indianapolis, IN.

    This document contains a final report, evaluation, and curriculum materials from a project conducted at the RJR Nabisco plant in Indianapolis to upgrade the literacy and numeracy skills of the workers to facilitate technological changes to production lines. As the final report explains, although the goal of the project was to recruit and test 150…

  4. Supporting Energy-Related Societal Applications Using NASA's Satellite and Modeling Data

    NASA Technical Reports Server (NTRS)

    Stackhouse, Paul W., Jr.; Whitlock, C. H.; Chandler, W. S.; Hoell, J. M.; Zhang, T.; Mikovitz, J. C.; Leng, G. S.; Lilienthal, P.

    2006-01-01

    Improvements to NASA Surface Meteorology and Solar Energy (SSE) web site are now being made through the Prediction of Worldwide Energy Resource (POWER) project under NASA Science Mission Directorate Applied Science Energy Management Program. The purpose of this project is to tailor NASA Science Mission results for energy sector applications and decision support systems. The current status of SSE and research towards upgrading estimates of total, direct and diffuse solar irradiance from NASA satellite measurements and analysis are discussed. Part of this work involves collaborating with partners such as the National Renewable Energy Laboratory (NREL) and the Natural Resources Canada (NRCan). Energy Management and POWER plans including historic, near-term and forecast datasets are also overviewed.

  5. We Need to Build AN Upgraded, Digital Democracy

    NASA Astrophysics Data System (ADS)

    Helbing, Dirk

    With all the big data available, would it be possible to build a crystal ball allowing us to see everything that is going on in the world in real time? Such projects are in fact under way, built by the military and research centers around the world. These are also political projects, because knowledge is power. Will so much data enable the ruling of a wise king or a benevolent dictator? Could society even be run like a giant machine? Indeed, there are companies that work on such concepts, for example, Google and IBM. They aim at building an operating system for our society that would try to steer our decision-making and behavior with personalized information...

  6. Progress and plan of KSTAR plasma control system upgrade

    DOE PAGES

    Hahn, Sang-hee; Kim, Y. J.; Penaflor, B. G.; ...

    2016-06-01

    The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Here, major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ~48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable duringmore » the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.« less

  7. End of Project Report [Upgrading measurement capabilities for hydrocarbons, halocarbons and alkyl nitrates

    NASA Technical Reports Server (NTRS)

    Blake, Donald R.

    1999-01-01

    This paper presents the End of Project Report from the P3-B Christmas Island local flights. Altitudinal variations in mixing ratios of several marine emitted gases, including DMS (dimethyl sulfide) are illustrated. This paper is presented in viewgraph form.

  8. 75 FR 57745 - FPL Energy Maine Hydro LLC; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... Unit 3 of the project by rewinding the generator and replacing the turbine runner with a more efficient runner. The proposed upgrade would increase the installed and hydraulic capacities of the project by 5.7...

  9. 77 FR 64334 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ..., Jack Rabbit to Big Sky Meadow Village 161 kV Transmission Line Upgrade, Bozeman Ranger District..., Lakewood Southeast Project, Proposes to Manage Vegetation and Habitat, Lakewood-Laona Ranger District... Interchange Project, Improvements, Solano County, CA, Review Period Ends: 11/19/2012, Contact: Melanie Brent...

  10. Vacuum System Upgrade for Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) at SNS

    DOE PAGES

    Stone, Christopher M.; Williams, Derrick C.; Price, Jeremy P.

    2016-09-23

    The Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) instrument at the Spallation Neutron Source (SNS), Oak Ridge, Tennessee, incorporates a 69m3 detector vessel with a vacuum system which required an upgrade with respect to performance, ease of operation, and maintenance. The upgrade focused on improving pumping performance as well as optimizing system design to minimize opportunity for operational error. This upgrade provided the following practical contributions: Reduced time required to evacuate from atmospheric pressure to 2mTorr from 500-1,000 minutes to 60-70 minutes Provided turn-key automated control with a multi-faceted interlock for personnel and machine safety.

  11. Vacuum System Upgrade for Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) at SNS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Christopher M.; Williams, Derrick C.; Price, Jeremy P.

    The Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) instrument at the Spallation Neutron Source (SNS), Oak Ridge, Tennessee, incorporates a 69m3 detector vessel with a vacuum system which required an upgrade with respect to performance, ease of operation, and maintenance. The upgrade focused on improving pumping performance as well as optimizing system design to minimize opportunity for operational error. This upgrade provided the following practical contributions: Reduced time required to evacuate from atmospheric pressure to 2mTorr from 500-1,000 minutes to 60-70 minutes Provided turn-key automated control with a multi-faceted interlock for personnel and machine safety.

  12. 20 CFR 619.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... inquiries and responses between SWAs. Major IT Modernization Project means conversion, re-engineering..., or upgrading software libraries, protocols, or hardware platform and infrastructure. These are...

  13. Upgrade of a GEP50 robot control system

    NASA Astrophysics Data System (ADS)

    Alounai, Ali T.; Gharsalli, Imed

    2000-03-01

    Recently the ASL at Tennessee Technological University was donated a GEP50 welder. The welding is done via off line point-to-point teaching. A state of the art robot was needed for research but because money was not available to purchase such an expensive item. It was therefore decided to upgrade the GEP50 control system to make the welder a multitasking robot. The robot has five degrees of freedom can be sufficient to pursue some research in robotics control. The problem was that the control system of the welder is limited to point-to-point control, using off-line teaching. To make the GEP50 a multitasking robot that can be controlled using different control strategies, the existing control system of the welder had to be replaced. The upgrade turned to be a low cost operation. This robot is currently in sue to test different advanced control strategies in the ASL. This work discusses all the steps and tasks undertaken during the upgrade operation. The hardware and software required or the upgrade are provided in this paper. The newly developed control system has been implemented and tested successfully.

  14. Evaluation Of A Residential Retrofit Program In Omaha Nebraska: A Comparison Of Actual Energy Savings With Audit Predictions Using Quantitative Analysis

    NASA Astrophysics Data System (ADS)

    Cory, Bradley S.

    The reEnergize Program conducted 957 energy upgrades in Omaha Nebraska from July 2010 to September 30th 2013, through a government grant within the Better Buildings Neighborhood Program. Projected program savings were provided upon program completion but it was unknown how effective the program was at actually reducing energy consumption in the homes that were upgraded. The following research report uses a PRISM analysis to remove the effect of weather and compare the actual pre and post utility usage rates to determine the actual effectiveness of the program. The housing characteristics, and individual energy upgrades were analyzed to see if any patterns or trends could be identified between consumption savings and housing type and specific upgrade measure. The results of the study showed that the program did induce savings but by much less than the engineering estimates predicted. It is likely that housing characteristics and upgrade measures play a role in inducing consumption savings but homeowner behavior is a stronger factor that influences savings.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Del Bianco, M.; Wiehagen, J.

    This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of buildingmore » air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.« less

  16. The 11 T dipole for HL-LHC: Status and plan

    DOE PAGES

    Savary, F.; Barzi, E.; Bordini, B.; ...

    2016-06-01

    The upgrade of the Large Hadron Collider (LHC) collimation system includes additional collimators in the LHC lattice. The longitudinal space for these collimators will be created by replacing some of the LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. The project plan comprises the construction of two cryoassemblies containing each of the two 11-T dipoles of 5.5-m length for possible installation on either side of interaction point 2 of LHC in the years 2018-2019 for ion operation, and the installation of two cryoassemblies on either side of interaction point 7 of LHCmore » in the years 2023-2024 for proton operation. The development program conducted in conjunction between the Fermilab and CERN magnet groups is progressing well. The development activities carried out on the side of Fermilab were concluded in the middle of 2015 with the fabrication and test of a 1-m-long two-in-one model and those on the CERN side are ramping up with the construction of 2-m-long models and the preparation of the tooling for the fabrication of the first full-length prototype. The engineering design of the cryomagnet is well advanced, including the definition of the various interfaces, e.g., with the collimator, powering, protection, and vacuum systems. Several practice coils of 5.5-m length have been already fabricated. This paper describes the overall progress of the project, the final design of the cryomagnet, and the performance of the most recent models. Furthermore, the overall plan toward the fabrication of the series magnets for the two phases of the upgrade of the LHC collimation system is also presented.« less

  17. Integrating Unified Gravity Wave Physics into the NOAA Next Generation Global Prediction System

    NASA Astrophysics Data System (ADS)

    Alpert, J. C.; Yudin, V.; Fuller-Rowell, T. J.; Akmaev, R. A.

    2017-12-01

    The Unified Gravity Wave Physics (UGWP) project for the Next Generation Global Prediction System (NGGPS) is a NOAA collaborative effort between the National Centers for Environmental Prediction (NCEP), Environemntal Modeling Center (EMC) and the University of Colorado, Cooperative Institute for Research in Environmental Sciences (CU-CIRES) to support upgrades and improvements of GW dynamics (resolved scales) and physics (sub-grid scales) in the NOAA Environmental Modeling System (NEMS)†. As envisioned the global climate, weather and space weather models of NEMS will substantially improve their predictions and forecasts with the resolution-sensitive (scale-aware) formulations planned under the UGWP framework for both orographic and non-stationary waves. In particular, the planned improvements for the Global Forecast System (GFS) model of NEMS are: calibration of model physics for higher vertical and horizontal resolution and an extended vertical range of simulations, upgrades to GW schemes, including the turbulent heating and eddy mixing due to wave dissipation and breaking, and representation of the internally-generated QBO. The main priority of the UGWP project is unified parameterization of orographic and non-orographic GW effects including momentum deposition in the middle atmosphere and turbulent heating and eddies due to wave dissipation and breaking. The latter effects are not currently represented in NOAA atmosphere models. The team has tested and evaluated four candidate GW solvers integrating the selected GW schemes into the NGGPS model. Our current work and planned activity is to implement the UGWP schemes in the first available GFS/FV3 (open FV3) configuration including adapted GFDL modification for sub-grid orography in GFS. Initial global model results will be shown for the operational and research GFS configuration for spectral and FV3 dynamical cores. †http://www.emc.ncep.noaa.gov/index.php?branch=NEMS

  18. Technical Update for Vocational Agriculture Teachers in Secondary Schools. Final Report.

    ERIC Educational Resources Information Center

    Iowa State Univ. of Science and Technology, Ames. Dept. of Agricultural Education.

    A project provided ongoing opportunities for teachers in Iowa to upgrade their expertise in agribusiness management using new technology; production, processing, and marketing agricultural products; biotechnology in agriculture; and conservation of natural resources. The project also modeled effective teaching methods and strategies. Project…

  19. Developing the Muon Facilities at ISIS

    NASA Astrophysics Data System (ADS)

    Hillier, A. D.; Aramini, M.; Baker, P. J.; Berlie, A.; Biswas, P. K.; Cottrell, S. P.; Ishida, K.; Loe, T.; Lord, J. S.; Pooley, D. E.; Pratt, F. L.; Rhodes, N. J.; da Silva Afonso, R. J.; Telling, M. T. F.; Yokoyama, K.

    For the last 30 years, muon experiments at ISIS have been making a significant contribution to a number of scientific fields. However, as a community of researchers, we are always aiming to improve and extend the instruments' capabilities. In this paper, we will review key developments at the ISIS muon facility, the primary beamline upgrade and recent technique developments, before taking a forward look to new projects, such as: the upgrade for MuSR, e-learning, detector development and sample environment.

  20. Cases of Project Upgrade: Results of Interview Studies in 14 Fleet Units.

    DTIC Science & Technology

    1983-08-01

    pregnancy, sle suffered a miscarriage , followed by an ther child with medical problems. Refusing to use , ". .4 . ’ , " i : ; . . .1 23 military medical...sustaining himself with vitamins . Indeed, after a period of poor performance, they had searched his locker and had found bottles and bottles of over-the...counter vitamins , upon which S he sustained himself. Upgrade Case #22 No background information in any depth was available. The individual had

  1. Scientific/Technical Report Bioenergetics Research Initiative Award number-DE-FG02-05ER64092

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trappe, Scott A

    2009-12-04

    General Project Overview and Final Technical Report This equipment grant was utilized to enhance the infrastructure of the Human Performance Laboratory at Ball State University. The laboratories primary focus is human based exercise physiology conducting research in the areas of sports performance, aging and exercise, unloading (space flight and bed rest), pediatric exercise and clinical exercise physiology. The main equipment supported by this grant was an ultrasound unit for cardiac and skeletal muscle imaging at the whole organ level, microscope system for micro imaging of skeletal muscle tissue, running treadmill for energy expenditure assessment, autoclave for sterilization, and upgrade tomore » our dual x–ray absorptiometry (DEXA) system that was utilized for body composition measurements. The equipment was involved in several human metabolic and skeletal muscle research projects as highlighted above. In particular, this equipment served a support role for other large–scale clinical projects funded by the National Institutes of Health (NIH), National Aeronautics and Space Administration (NASA), and corporate sponsors.« less

  2. Climate tools in mainstream Linux distributions

    NASA Astrophysics Data System (ADS)

    McKinstry, Alastair

    2015-04-01

    Debian/meterology is a project to integrate climate tools and analysis software into the mainstream Debian/Ubuntu Linux distributions. This work describes lessons learnt, and recommends practices for scientific software to be adopted and maintained in OS distributions. In addition to standard analysis tools (cdo,, grads, ferret, metview, ncl, etc.), software used by the Earth System Grid Federation was chosen for integraion, to enable ESGF portals to be built on this base; however exposing scientific codes via web APIs enables security weaknesses, normally ignorable, to be exposed. How tools are hardened, and what changes are required to handle security upgrades, are described. Secondly, to enable libraries and components (e.g. Python modules) to be integrated requires planning by writers: it is not sufficient to assume users can upgrade their code when you make incompatible changes. Here, practices are recommended to enable upgrades and co-installability of C, C++, Fortran and Python codes. Finally, software packages such as NetCDF and HDF5 can be built in multiple configurations. Tools may then expect incompatible versions of these libraries (e.g. serial and parallel) to be simultaneously available; how this was solved in Debian using "pkg-config" and shared library interfaces is described, and best practices for software writers to enable this are summarised.

  3. South Lake Elementary students enjoy gift of computers

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Nancy Nichols, principal of South Lake Elementary School, Titusville, Fla., joins students in teacher Michelle Butler's sixth grade class who are unwrapping computer equipment donated by Kennedy Space Center. South Lake is one of 13 Brevard County schools receiving 81 excess contractor computers thanks to an innovative educational outreach project spearheaded by the Nasa k-12 Education Services Office at ksc. The Astronaut Memorial Foundation, a strategic partner in the effort, and several schools in rural Florida and Georgia also received refurbished computers as part of the year-long project. Ksc employees put in about 3,300 volunteer hours to transform old, excess computers into upgraded, usable units. A total of $90,000 in upgraded computer equipment is being donated.

  4. AN/ASQ-197 provides commonality to Recce systems and avionics upgrades

    NASA Astrophysics Data System (ADS)

    Regan, Brendan P.

    1993-02-01

    In an attempt to strike a balance between increases in multi-role tactical air reconnaissance mission tasking and simultaneous decreases in defense spending, many users are evaluating upgrades to existing sensors and reconnaissance systems. At the heart of any cost-effective reconnaissance system upgrade must be a flexible reconnaissance management system, capable of filling multiple rolls in today's film backed reconnaissance system, while enabling successful transition to the Electro-Optical (EO) system of tomorrow. As a case in point this paper describes enhanced effectiveness and growth potential that Fairchild's AN/ASQ-197 Sensor Control-Data Display Set (SC-DDS) can provide.

  5. System and process for upgrading hydrocarbons

    DOEpatents

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  6. Progress update on cryogenic system for ARIEL E-linac at TRIUMF

    NASA Astrophysics Data System (ADS)

    Koveshnikov, A.; Bylinskii, I.; Hodgson, G.; Yosifov, D.

    2014-01-01

    TRIUMF is involved in a major upgrade. The Advanced Rare IsotopeE Laboratory (ARIEL) has become a fully funded project in July 2010. A 10 mA 50 MeV SRF electron linac (e-linac) operating CW at 1.3 GHz is the key component of this initiative. This machine will serve as a second independent photo-fission driver for Rare Isotope Beams (RIB) production at TRIUMF's Isotope Separator and Accelerator (ISAC) facility. The cryogens delivery system requirements are driven by the electron accelerator cryomodule design [1, 2]. Since commencement of the project in 2010 the cryogenic system of e-linac has moved from the conceptual design phase into engineering design and procurement stage. The present document summarizes the progress in cryogenic system development and construction. Current status of e-linac cryogenic system including details of LN2 storage and delivery systems, and helium subatmospheric (SA) system is presented. The first phase of e-linac consisting of two cryomodules, cryogens storage, delivery, and distribution systems, and a 600 W class liquid helium cryoplant is scheduled for installation and commissioning by year 2014.

  7. Bandwidth Efficient Modulation and Coding Techniques for NASA's Existing Ku/Ka-Band 225 MHz Wide Service

    NASA Technical Reports Server (NTRS)

    Gioannini, Bryan; Wong, Yen; Wesdock, John

    2005-01-01

    The National Aeronautics and Space Administration (NASA) has recently established the Tracking and Data Relay Satellite System (TDRSS) K-band Upgrade Project (TKUP), a project intended to enhance the TDRSS Ku-band and Ka-band Single Access Return 225 MHz (Ku/KaSAR-225) data service by adding the capability to process bandwidth efficient signal design and to replace the White Sand Complex (WSC) KSAR high data rate ground equipment and high rate switches which are nearing obsolescence. As a precursor to this project, a modulation and coding study was performed to identify signal structures which maximized the data rate through the Ku/KaSAR-225 channel, minimized the required customer EIRP and ensured acceptable hardware complexity on the customer platform. This paper presents the results and conclusions of the TKUP modulation and coding study.

  8. NASA Ames Research Center 60 MW Power Supply Modernization

    NASA Technical Reports Server (NTRS)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  9. Development Communication in an Urban Setting.

    ERIC Educational Resources Information Center

    Development Communication Report, 1980

    1980-01-01

    The application of lessons gained from rural experience with development communications to the problems of delivering social services to the poorer segments of the urban areas is described in a report on the squatter upgrading project in Lusaka, the capital of Zambia. A Project Support Communications Unit established to provide communication…

  10. Work Life Improvements for Home Care Workers: Impact and Feasibility.

    ERIC Educational Resources Information Center

    Feldman, Penny Hollander

    1993-01-01

    Evaluated four work life demonstration projects designed to upgrade home aide employment, reduce turnover, and increase continuity of care. Found that projects reduced worker turnover in experimental groups from 10 to 44 percentage points. Where it was measured, continuity of care also significantly improved. Local political, economic, and…

  11. Internet2: Building and Deploying Advanced, Networked Applications.

    ERIC Educational Resources Information Center

    Hanss, Ted

    1997-01-01

    Internet2, a consortium effort of over 100 universities, is investing in upgrading campus and national computer network platforms for such applications as digital libraries, collaboration environments, tele-medicine, and distance-independent instruction. The project is described, issues the project intends to address are detailed, and ways in…

  12. Upgrade of absolute extreme ultraviolet diagnostic on J-TEXT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, X. L.; Cheng, Z. F., E-mail: chengfe@hust.edu.cn; Hou, S. Y.

    The absolute extreme ultraviolet (AXUV) diagnostic system is used for radiation observation on J-TEXT tokamak [J. Zhang, G. Zhuang, Z. J. Wang, Y. H. Ding, X. Q. Zhang, and Y. J. Tang, Rev. Sci. Instrum. 81, 073509 (2010)]. The upgrade of the AXUV system is aimed to improve the spatial resolution and provide a three-dimensional image on J-TEXT. The new system consists of 12 AXUV arrays (4 AXUV16ELG arrays, 8 AXUV20ELG arrays). The spatial resolution in the cross-section is 21 mm for the AXUV16ELG arrays and 17 mm for the AXUV20ELG arrays. The pre-amplifier is also upgraded for a highermore » signal to noise ratio. By upgrading the AXUV imaging system, a more accurate observation on the radiation information is obtained.« less

  13. The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

    NASA Astrophysics Data System (ADS)

    Andre, J.-M.; Behrens, U.; Branson, J.; Brummer, P.; Chaze, O.; Cittolin, S.; Contescu, C.; Craigs, B. G.; Darlea, G.-L.; Deldicque, C.; Demiragli, Z.; Dobson, M.; Doualot, N.; Erhan, S.; Fulcher, J. F.; Gigi, D.; Gładki, M.; Glege, F.; Gomez-Ceballos, G.; Hegeman, J.; Holzner, A.; Janulis, M.; Jimenez-Estupiñán, R.; Masetti, L.; Meijers, F.; Meschi, E.; Mommsen, R. K.; Morovic, S.; O'Dell, V.; Orsini, L.; Paus, C.; Petrova, P.; Pieri, M.; Racz, A.; Reis, T.; Sakulin, H.; Schwick, C.; Simelevicius, D.; Zejdl, P.

    2017-10-01

    The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of 7.5 × 1034 cm-2 s -1 (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes, and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. In this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ “data center” are analysed. Emerging technologies for data reduction are considered. Novel possible approaches to event building and online processing, inspired by trending developments in other areas of computing dealing with large masses of data, are also examined. We conclude by discussing the opportunities offered by reading out and processing parts of the detector, wherever the front-end electronics allows, at the machine clock rate (40 MHz). This idea presents interesting challenges and its physics potential should be studied.

  14. The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

    DOE PAGES

    Andre, J-M; Behrens, U.; Branson, J.; ...

    2017-10-01

    The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of 7.5 × 10 34 cm -2 s -1 (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes,more » and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. Here in this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ “data center” are analysed. Emerging technologies for data reduction are considered. Novel possible approaches to event building and online processing, inspired by trending developments in other areas of computing dealing with large masses of data, are also examined. We conclude by discussing the opportunities offered by reading out and processing parts of the detector, wherever the front-end electronics allows, at the machine clock rate (40 MHz). This idea presents interesting challenges and its physics potential should be studied.« less

  15. Coal ash by-product reutilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muncy, J.; Miller, B.

    1997-09-01

    Potomac Electric Power Company (PEPCO) has as part of its vision and value statement that, ``We are responsible stewards of environmental and corporate resources.`` With this moral imperative in mind, a project team was charged with initiating the Coal Pile Liner Project--installing a membrane liner under the existing coal storage pile at the Morgantown Generating Station. The existing coal yard facilities were constructed prior to the current environmental regulations, and it became necessary to upgrade the storage facilities to be environmentally friendly. The project team had two objectives in this project: (1) prevent coal pile leachate from entering the groundwatermore » system; (2) test the viability of using coal ash by-products as an aggregate substitute for concrete applications. Both objectives were met, and two additional benefits were achieved as well: (1) the use of coal ash by-products as a coal liner produced significant cost savings to the project directly; (2) the use of coal ash by-products reduced plant operation and maintenance expenses.« less

  16. Grizzly Substation Fiber Optics : Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affectingmore » the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).« less

  17. High power s-band vacuum load

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neubauer, Michael; Dudas, Alan; Krasnykh, Anatoly

    Through a combination of experimentation and calculation the components of a novel room temperature dry load were successfully fabricated. These components included lossy ceramic cylinders of various lengths, thicknesses, and percent of silicon carbide (SiC). The cylinders were then assembled into stainless steel compression rings by differential heating of the parts and a special fixture. Post machining of this assembly provided a means for a final weld. The ring assemblies were then measured for S-parameters, individually and in pairs using a low-cost TE10 rectangular to TE01 circular waveguide adapter specially designed to be part of the final load assembly. Matchedmore » pairs of rings were measured for assembly into the final load, and a sliding short designed and fabricated to assist in determining the desired short location in the final assembly. The plan for the project was for Muons, Inc. to produce prototype loads for long-term testing at SLAC. The STTR funds for SLAC were to upgrade and operate their test station to ensure that the loads would satisfy their requirements. Phase III was to be the sale to SLAC of loads that Muons, Inc. would manufacture. However, an alternate solution that involved a rebuild of the old loads, reduced SLAC budget projections, and a relaxed time for the replacement of all loads meant that in-house labor will be used to do the upgrade without the need for the loads developed in this project. Consequently, the project was terminated before the long term testing was initiated. However, SLAC can use the upgraded test stand to compare the long-term performance of the ones produced in this project with their rebuilt loads when they are available.« less

  18. Advanced Space Surface Systems Operations

    NASA Technical Reports Server (NTRS)

    Huffaker, Zachary Lynn; Mueller, Robert P.

    2014-01-01

    The importance of advanced surface systems is becoming increasingly relevant in the modern age of space technology. Specifically, projects pursued by the Granular Mechanics and Regolith Operations (GMRO) Lab are unparalleled in the field of planetary resourcefulness. This internship opportunity involved projects that support properly utilizing natural resources from other celestial bodies. Beginning with the tele-robotic workstation, mechanical upgrades were necessary to consider for specific portions of the workstation consoles and successfully designed in concept. This would provide more means for innovation and creativity concerning advanced robotic operations. Project RASSOR is a regolith excavator robot whose primary objective is to mine, store, and dump regolith efficiently on other planetary surfaces. Mechanical adjustments were made to improve this robot's functionality, although there were some minor system changes left to perform before the opportunity ended. On the topic of excavator robots, the notes taken by the GMRO staff during the 2013 and 2014 Robotic Mining Competitions were effectively organized and analyzed for logistical purposes. Lessons learned from these annual competitions at Kennedy Space Center are greatly influential to the GMRO engineers and roboticists. Another project that GMRO staff support is Project Morpheus. Support for this project included successfully producing mathematical models of the eroded landing pad surface for the vertical testbed vehicle to predict a timeline for pad reparation. And finally, the last project this opportunity made contribution to was Project Neo, a project exterior to GMRO Lab projects, which focuses on rocket propulsion systems. Additions were successfully installed to the support structure of an original vertical testbed rocket engine, thus making progress towards futuristic test firings in which data will be analyzed by students affiliated with Rocket University. Each project will be explained in further detail, as well as the full scope of the contributions made during this opportunity.

  19. Development and Test of Robotically Assisted Extravehicular Activity Gloves

    NASA Technical Reports Server (NTRS)

    Rogers, Jonathan M.; Peters, Benjamin J.; Laske, Evan A.; McBryan, Emily R.

    2017-01-01

    Over the past two years, the High Performance EVA Glove (HPEG) project under NASA's Space Technology Mission Directorate (STMD) funded an effort to develop an electromechanically-assisted space suit glove. The project was a collaboration between the Johnson Space Center's Software, Robotics, and Simulation Division and the Crew and Thermal Systems division. The project sought to combine finger actuator technology developed for Robonaut 2 with the softgoods from the ILC Phase VI EVA glove. The Space Suit RoboGlove (SSRG) uses a system of three linear actuators to pull synthetic tendons attached to the glove's fingers to augment flexion of the user's fingers. To detect the user's inputs, the system utilizes a combination of string potentiometers along the back of the fingers and force sensitive resistors integrated into the fingertips of the glove cover layer. This paper discusses the development process from initial concepts through two major phases of prototypes, and the results of initial human testing. Initial work on the project focused on creating a functioning proof of concept, designing the softgoods integration, and demonstrating augmented grip strength with the actuators. The second year of the project focused on upgrading the actuators, sensors, and software with the overall goal of creating a system that moves with the user's fingers in order to reduce fatigue associated with the operation of a pressurized glove system. This paper also discusses considerations for a flight system based on this prototype development and address where further work is required to mature the technology.

  20. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-01

    Carrying a crew of seven, the Space Shuttle Orbiter Columbia soared through some pre-dawn clouds into the sky as it began its 27th flight, STS-109. Launched March 1, 2002, the goal of the mission was the maintenance and upgrade of the Hubble Space Telescope (HST). The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. The HST views galaxies, stars, planets, comets, possibly other solar systems, and even unusual phenomena such as quasars, with 10 times the clarity of ground-based telescopes. During the STS-109 mission, the telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm. Here four members of the crew performed five spacewalks completing system upgrades to the HST. Included in those upgrades were: replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when it original coolant ran out. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.

  1. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    DTIC Science & Technology

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  2. PDS4: Developing the Next Generation Planetary Data System

    NASA Technical Reports Server (NTRS)

    Crichton, D.; Beebe, R.; Hughes, S.; Stein, T.; Grayzeck, E.

    2011-01-01

    The Planetary Data System (PDS) is in the midst of a major upgrade to its system. This upgrade is a critical modernization of the PDS as it prepares to support the future needs of both the mission and scientific community. It entails improvements to the software system and the data standards, capitalizing on newer, data system approaches. The upgrade is important not only for the purpose of capturing results from NASA planetary science missions, but also for improving standards and interoperability among international planetary science data archives. As the demands of the missions and science community increase, PDS is positioning itself to evolve and meet those demands.

  3. Optimization of waste heat utilization in cold end system of thermal power station based on neural network algorithm

    NASA Astrophysics Data System (ADS)

    Du, Zenghui

    2018-04-01

    At present, the flue gas waste heat utilization projects of coal-fired boilers are often limited by low temperature corrosion problems and conventional PID control. The flue gas temperature cannot be reduced to the best efficiency temperature of wet desulphurization, resulting in the failure of heat recovery to be the maximum. Therefore, this paper analyzes, researches and solves the remaining problems of the cold end system of thermal power station, so as to provide solutions and theoretical support for energy saving and emission reduction and upgrading and the improvement of the comprehensive efficiency of the units.

  4. Barium Tagging from nEXO Using Resonance Ionization Spectroscopy

    NASA Astrophysics Data System (ADS)

    Twelker, K.; Kravitz, S.

    nEXO is a 5-ton liquid enriched-xenon time projection chamber (TPC) to search for neutrinoless double-beta decay, designed to have the sensitivity to completely probe the inverted mass hierarchy of Majorana neutrinos. The detector will accommodate-as a background reduction technique-a system to recover and identify the barium decay product. This upgrade will allow a background-free measurement of neutrinoless double-beta decay and increase the half-life sensitivity of the experiment by at least one order of magnitude. Ongoing research and development includes a system to test barium extraction from liquid xenon using surface adsorption and Resonance Ionization Spectroscopy (RIS).

  5. Sequence and batch language programs and alarm related C Programs for the 242-A MCS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, J.F.

    1996-04-15

    A Distributive Process Control system was purchased by Project B-534, 242-A Evaporator/Crystallizer Upgrades. This control system, called the Monitor and Control system (MCS), was installed in the 242-A evaporator located in the 200 East Area. The purpose of the MCS is to monitor and control the Evaporator and monitor a number of alarms and other signals from various Tank Farm facilities. Applications software for the MCS was developed by the Waste Treatment Systems Engineering (WTSE) group of Westinghouse. The standard displays and alarm scheme provide for control and monitoring, but do not directly indicate the signal location or depict themore » overall process. To do this, WTSE developed a second alarm scheme.« less

  6. A portable gas recirculation unit for gaseous detectors

    NASA Astrophysics Data System (ADS)

    Guida, R.; Mandelli, B.

    2017-10-01

    The use of greenhouse gases (usually C2H2F4, CF4 and SF6) is sometimes necessary to achieve the required performance for some gaseous detectors. The consumption of these gases in the LHC systems is reduced by recycling the gas mixture thanks to a complex gas recirculation system. Beyond greenhouse gas consumption due to LHC systems, a considerable contribution is generated by setups used for LHC detector upgrade projects, R&D activities, detector quality assurance or longevity tests. In order to minimise this emission, a new flexible and portable gas recirculation unit has been developed. Thanks to its low price, flexibility and user-friendly operation it can be easily adapted for the different types of detector systems and set-ups.

  7. GEOS S2S-2_1 File Specification: GMAO Seasonal and Sub-Seasonal Forecast Output

    NASA Technical Reports Server (NTRS)

    Kovach, Robin M.; Marshak, Jelena; Molod, Andrea; Nakada, Kazumi

    2018-01-01

    The NASA GMAO seasonal (9 months) and subseasonal (45 days) forecasts are produced with the Goddard Earth Observing System (GEOS) Atmosphere-Ocean General Circulation Model and Data Assimilation System Version S2S-2_1. The new system replaces version S2S-1.0 described in Borovikov et al (2017), and includes upgrades to many components of the system. The atmospheric model includes an upgrade from a pre-MERRA-2 version running on a latitude-longitude grid at approx. 1 degree resolution to a current version running on a cubed sphere grid at approximately 1/2 degree resolution. The important developments are related to the dynamical core (Putman et al., 2011), the moist physics (''two-moment microphysics'' of Barahona et al., 2014) and the cryosphere (Cullather et al., 2014). As in the previous GMAO S2S system, the land model is that of Koster et al (2000). GMAO S2S-2_1 now includes the Goddard Chemistry Aerosol Radiation and Transport (GOCART, Colarco et al., 2010) single moment interactive aerosol model that includes predictive aerosols including dust, sea salt and several species of carbon and sulfate. The previous version of GMAO S2S specified aerosol amounts from climatology, which were used to inform the atmospheric radiation only. The ocean model includes an upgrade from MOM4 to MOM5 (Griffies 2012), and continues to be run on the tripolar grid at approximately 1/2 degree resolution in the tropics with 40 vertical levels. As in S2S-1.0, the sea ice model is from the Los Alamos Sea Ice model (CICE4, Hunke and Lipscomb 2010). The Ocean Data Assimilation System (ODAS) has been upgraded from the one described in Borovikov et al., 2017 to one that uses a modified version of the Penny, 2014 Local Ensemble Transform Kalman Filter (LETKF), and now assimilates along-track altimetry. The ODAS also does a nudging to MERRA-2 SST and sea ice boundary conditions. The atmospheric data assimilation fields used to constrain the atmosphere in the ODAS have been upgraded from MERRA to a MERRA-2 like system. The system is initialized using a MERRA-2-like atmospheric reanalysis (Gelaro et al. 2017) and the GMAO S2S-2_1 ocean analysis. Additional ensemble members for forecasts are produced with initial states at 5-day intervals, with additional members based on perturbations of the atmospheric and ocean states. Both subseasonal and seasonal forecasts are submitted to the National MultiModel Ensemble (NMME) project, and are part of the US/Canada multimodel seasonal forecasts (http://www.cpc.ncep.noaa.gov/products/NMME/). A large suite of retrospective forecasts (''hindcasts'') have been completed, and contribute to the calculation of the model's baseline climatology and drift, anomalies from which are the basis of the seasonal forecasts.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Geet, Otto

    NREL has developed a methodology to prioritize which data center cooling systems could be upgraded for better efficiency based on estimated cost savings and economics. The best efficiency results are in cool or dry climates where 'free' economizer or evaporative cooling can provide most of the data center cooling. Locations with a high cost of energy and facilities with high power usage effectiveness (PUE) are also good candidates for data center cooling system upgrades. In one case study of a major cable provider's data centers, most of the sites studied had opportunities for cost-effective cooling system upgrades with payback periodmore » of 5 years or less. If the cable provider invested in all opportunities for upgrades with payback periods of less than 15 years, it could save 27% on annual energy costs.« less

  9. Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary. Existing Conditions and Baseline Energy Use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Del Bianco, M.; Wood, A.

    2013-02-01

    A multi-year pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and '40 homes. The three predominate construction methods of the townhomes in the community are materials common to the area and climate zone including 8” CMU block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the roll out of a decade-long community upgrade program that will incorporate energy efficiency to the building envelope and equipment with the modernization of othermore » systems like plumbing, mechanical equipment, and cladding.« less

  10. Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Del Bianco, M.; Wood, A.

    2013-02-01

    A multi-year pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and '40 homes. The three predominate construction methods of the townhomes in the community are materials common to the area and climate zone including 8" CMU block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the roll out of a decade-long community upgrade program that will incorporate energy efficiency to the building envelope and equipment with the modernization of othermore » systems like plumbing, mechanical equipment, and cladding.« less

  11. The application of remote sensing to resource management and environmental quality programs in Kansas

    NASA Technical Reports Server (NTRS)

    Barr, B. G.; Martinko, E. A. (Principal Investigator)

    1982-01-01

    Capabilities to process data for state agencies in Kansas were upgraded through the vehicle of a low cost data processing system. Short term projects in which agencies identified areas of immediate needs, and longer terms projects, continued from previous years, are described including studies of Arkansas River irrigation; evaluation of rangeland in the Cimarron National Grassland; a model of the Walnut Creek watershed groundwater; selection of a pronghorn antelope release site; the establishment of a geographical data base for tax reassessment in Finney County; a land use/land cover inventory and hazards assessment; and applied R & D in agricultural remote sensing. The topics discussed at a short course in remote sensing and publications are listed.

  12. Status and Prospects for the EXO-200 and nEXO Experiments

    NASA Astrophysics Data System (ADS)

    Yang, Liang; ">EXO-200, Status of display systems in B-52H

    NASA Astrophysics Data System (ADS)

    Hopper, Darrel G.; Meyer, Frederick M.; Wodke, Kenneth E.

    1999-08-01

    Display technologies for the B-52 were selected some 40 years ago have become unsupportable. Electromechanical and old cathode ray tube technologies, including an exotic six-gun 13 in. tube, have become unsupportable due to the vanishing vendor syndrome. Thus, it is necessary to insert new technologies which will be available for the next 40 years to maintain the capability heretofore provided by those now out of favor with the commercial sector. With this paper we begin a look at the status of displays in the B-52H, which will remain in inventory until 2046 according to current plans. From a component electronics technology perspective, such as displays, the B-52H provides several 10-year life cycle cost (LCC) planning cycles to consider multiple upgrades. Three Productivity, Reliability, Availability, and Maintainability (PRAM) projects are reviewed to replace 1950s CRTs in several sizes: 3, 9, and 13 in. A different display technology has been selected in each case. Additional display upgrades in may be anticipated and are discussed.

  13. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-01

    Carrying the STS-109 crew of seven, the Space Shuttle Orbiter Columbia blasted from its launch pad as it began its 27th flight and 108th flight overall in NASA's Space Shuttle Program. Launched March 1, 2002, the goal of the mission was the maintenance and upgrade of the Hubble Space Telescope (HST) which was developed, designed, and constructed by the Marshall Space Flight Center. Captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, the HST received the following upgrades: replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when it original coolant ran out. Four of the crewmembers performed 5 space walks in the 10 days, 22 hours, and 11 minutes of the the STS-109 mission.

  14. ENERGY EFFICIENCY UPGRADES FOR SANITATION FACILITIES IN SELAWIK, AK FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    POLLIS, REBECCA

    2014-10-17

    The Native Village of Selawik is a federally recognized Alaskan tribe, located at the mouth of the Selawik River, about 90 miles east of Kotzebue in northwest Alaska. Due to the community’s rural location and cold climate, it is common for electric rates to be four times higher than the cost urban residents pay. These high energy costs were the driving factor for Selawik pursuing funding from the Department of Energy in order to achieve significant energy cost savings. The main objective of the project was to improve the overall energy efficiency of the water treatment/distribution and sewer collection systemsmore » in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit. One purpose for the proposed improvements was to enable the community to realize significant savings associated with the cost of energy. Another purpose of the upgrades was to repair the vacuum sewer system on the west side of Selawik to prevent future freeze-up problems during winter months.« less

  15. 76 FR 66044 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ... HAWKEYE Aircraft with weapon system sensor upgrades with Mode 5/S Identification Friend or Foe (IFF... system sensor upgrades with Mode 5/S Identification Friend or Foe (IFF). Included are 5 APX-122 IFF Mode...

  16. X-ray optics simulation and beamline design for the APS upgrade

    NASA Astrophysics Data System (ADS)

    Shi, Xianbo; Reininger, Ruben; Harder, Ross; Haeffner, Dean

    2017-08-01

    The upgrade of the Advanced Photon Source (APS) to a Multi-Bend Achromat (MBA) will increase the brightness of the APS by between two and three orders of magnitude. The APS upgrade (APS-U) project includes a list of feature beamlines that will take full advantage of the new machine. Many of the existing beamlines will be also upgraded to profit from this significant machine enhancement. Optics simulations are essential in the design and optimization of these new and existing beamlines. In this contribution, the simulation tools used and developed at APS, ranging from analytical to numerical methods, are summarized. Three general optical layouts are compared in terms of their coherence control and focusing capabilities. The concept of zoom optics, where two sets of focusing elements (e.g., CRLs and KB mirrors) are used to provide variable beam sizes at a fixed focal plane, is optimized analytically. The effects of figure errors on the vertical spot size and on the local coherence along the vertical direction of the optimized design are investigated.

  17. Building America Case Study: Trade-Friendly Retrofit Insulated Panels for Existing Buildings, Albany, New York

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of buildingmore » air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Digital instrumentation and controls system technique is being introduced in new constructed research reactor or life extension of older research reactor. Digital systems are easy to change and optimize but the validated process for them is required. Also, to reduce project risk or cost, we have to make it sure that configuration and control functions is right before the commissioning phase on research reactor. For this purpose, simulators have been widely used in developing control systems in automotive and aerospace industries. In these literatures, however, very few of these can be found regarding test on the control system of researchmore » reactor with simulator. Therefore, this paper proposes a simulation platform to verify the performance of RRS (Reactor Regulating System) for research reactor. This simulation platform consists of the reactor simulation model and the interface module. This simulation platform is applied to I and C upgrade project of TRIGA reactor, and many problems of RRS configuration were found and solved. And it proved that the dynamic performance testing based on simulator enables significant time saving and improves economics and quality for RRS in the system test phase. (authors)« less

  19. Conceptual process design and techno-economic assessment of ex situ catalytic fast pyrolysis of biomass: A fixed bed reactor implementation scenario for future feasibility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dutta, Abhijit; Schaidle, Joshua A.; Humbird, David

    Ex situ catalytic fast pyrolysis of biomass is a promising route for the production of fungible liquid biofuels. There is significant ongoing research on the design and development of catalysts for this process. However, there are a limited number of studies investigating process configurations and their effects on biorefinery economics. Herein we present a conceptual process design with techno-economic assessment; it includes the production of upgraded bio-oil via fixed bed ex situ catalytic fast pyrolysis followed by final hydroprocessing to hydrocarbon fuel blendstocks. This study builds upon previous work using fluidized bed systems, as detailed in a recent design reportmore » led by the National Renewable Energy Laboratory (NREL/TP-5100-62455); overall yields are assumed to be similar, and are based on enabling future feasibility. Assuming similar yields provides a basis for easy comparison and for studying the impacts of areas of focus in this study, namely, fixed bed reactor configurations and their catalyst development requirements, and the impacts of an inline hot gas filter. A comparison with the fluidized bed system shows that there is potential for higher capital costs and lower catalyst costs in the fixed bed system, leading to comparable overall costs. The key catalyst requirement is to enable the effective transformation of highly oxygenated biomass into hydrocarbons products with properties suitable for blending into current fuels. Potential catalyst materials are discussed, along with their suitability for deoxygenation, hydrogenation and C–C coupling chemistry. This chemistry is necessary during pyrolysis vapor upgrading for improved bio-oil quality, which enables efficient downstream hydroprocessing; C–C coupling helps increase the proportion of diesel/jet fuel range product. One potential benefit of fixed bed upgrading over fluidized bed upgrading is catalyst flexibility, providing greater control over chemistry and product composition. Since this study is based on future projections, the impacts of uncertainties in the underlying assumptions are quantified via sensitivity analysis. As a result, this analysis indicates that catalyst researchers should prioritize by: carbon efficiency > catalyst cost > catalyst lifetime, after initially testing for basic operational feasibility.« less

  1. Conceptual process design and techno-economic assessment of ex situ catalytic fast pyrolysis of biomass: A fixed bed reactor implementation scenario for future feasibility

    DOE PAGES

    Dutta, Abhijit; Schaidle, Joshua A.; Humbird, David; ...

    2015-10-06

    Ex situ catalytic fast pyrolysis of biomass is a promising route for the production of fungible liquid biofuels. There is significant ongoing research on the design and development of catalysts for this process. However, there are a limited number of studies investigating process configurations and their effects on biorefinery economics. Herein we present a conceptual process design with techno-economic assessment; it includes the production of upgraded bio-oil via fixed bed ex situ catalytic fast pyrolysis followed by final hydroprocessing to hydrocarbon fuel blendstocks. This study builds upon previous work using fluidized bed systems, as detailed in a recent design reportmore » led by the National Renewable Energy Laboratory (NREL/TP-5100-62455); overall yields are assumed to be similar, and are based on enabling future feasibility. Assuming similar yields provides a basis for easy comparison and for studying the impacts of areas of focus in this study, namely, fixed bed reactor configurations and their catalyst development requirements, and the impacts of an inline hot gas filter. A comparison with the fluidized bed system shows that there is potential for higher capital costs and lower catalyst costs in the fixed bed system, leading to comparable overall costs. The key catalyst requirement is to enable the effective transformation of highly oxygenated biomass into hydrocarbons products with properties suitable for blending into current fuels. Potential catalyst materials are discussed, along with their suitability for deoxygenation, hydrogenation and C–C coupling chemistry. This chemistry is necessary during pyrolysis vapor upgrading for improved bio-oil quality, which enables efficient downstream hydroprocessing; C–C coupling helps increase the proportion of diesel/jet fuel range product. One potential benefit of fixed bed upgrading over fluidized bed upgrading is catalyst flexibility, providing greater control over chemistry and product composition. Since this study is based on future projections, the impacts of uncertainties in the underlying assumptions are quantified via sensitivity analysis. As a result, this analysis indicates that catalyst researchers should prioritize by: carbon efficiency > catalyst cost > catalyst lifetime, after initially testing for basic operational feasibility.« less

  2. Conceptual design report for the project to install leak detection in FAST-FT-534/548/549

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galloway, K.J.

    1992-07-01

    This report provides conceptual designs and design recommendations for installing secondary containment and leak detection systems for three sumps at the Fluorinel and Storage Facility (FAST), CPP-666. The FAST facility is located at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). The three sumps receive various materials from the FAST water treatment process. This project involves sump upgrades to meet appropriate environmental requirements. The steps include: providing sump modifications or designs for the installation of leak chases and/or leakage accumulation, coating the sump concrete with a chemical resistant sealant (except for sump VES-FT-534 which ismore » already lined with stainless steel) to act as secondary containment, lining the sumps with a primary containment system, and providing a means to detect and remove primary containment leakage that may occur.« less

  3. Cascade Distiller System Performance Testing Interim Results

    NASA Technical Reports Server (NTRS)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  4. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  5. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  6. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  7. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  8. 28 CFR 115.218 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...

  9. 28 CFR 115.218 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...

  10. 28 CFR 115.218 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...

  11. 31 CFR 26.5 - Upgrades and additional environmental information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., such environmental information from the MDB (e.g., environmental chapters from project feasibility studies or environmental data sheets) which contains this environmental analysis. The MDB Office will...

  12. Simulation Control Graphical User Interface Logging Report

    NASA Technical Reports Server (NTRS)

    Hewling, Karl B., Jr.

    2012-01-01

    One of the many tasks of my project was to revise the code of the Simulation Control Graphical User Interface (SIM GUI) to enable logging functionality to a file. I was also tasked with developing a script that directed the startup and initialization flow of the various LCS software components. This makes sure that a software component will not spin up until all the appropriate dependencies have been configured properly. Also I was able to assist hardware modelers in verifying the configuration of models after they have been upgraded to a new software version. I developed some code that analyzes the MDL files to determine if any error were generated due to the upgrade process. Another one of the projects assigned to me was supporting the End-to-End Hardware/Software Daily Tag-up meeting.

  13. Project T.E.A.M. (Technical Education Advancement Modules). Fundementals of Workplace Integration.

    ERIC Educational Resources Information Center

    Kraeling, Vicki

    This module is one of a series of instructional guides developed by Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training for unemployed, underemployed, and existing industrial employees whose basic technical skills are in need of upgrading. The module is a 27-hour overview course…

  14. Aiming at Narrowing Social Gaps in Israel through a Special Program of Everyman's University.

    ERIC Educational Resources Information Center

    Guri, Sarah

    The philosophy and implementation of the Community Leaders Project at Everyman's University (EU), the Open University of Israel, are discussed. The project is designed to narrow social gaps in Israel by upgrading the educational level of disadvantaged populations and by developing indigeneous leadership for decision-making in the most…

  15. Polyvalent Adult Education Centre (An Integrated Approach to Adult Education for Workers).

    ERIC Educational Resources Information Center

    Koshy, T. A.; And Others

    A project to upgrade the vocational skills of Indian workers is presented. This project is designed to plan and develop integrated educational and training courses of various duration for workers and prospective workers, through the establishment of Polyvalent Centers. These centers are institutions providing opportunity for many-sided education…

  16. Keewatin Region Educational Authority Pilot Adult Education Project: Computer-Assisted Learning. Final Report.

    ERIC Educational Resources Information Center

    Fahy, Patrick J.

    This 2-year project attempted to improve local employment prospects of young adult Inuit in seven communities in the Keewatin Region in the Canadian Northwest Territories by providing them computer-assisted instruction (CAI) in adult basic education and high school equivalency upgrading programs; business, financial, and telecommunications…

  17. A Hybrid Catalytic Route to Fuels from Biomass Syngas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harmon, Laurel; Hallen, Richard; Lilga, Michael

    LanzaTech partnered with the Pacific Northwest National Laboratory (PNNL), Imperium Aviation Fuels, InEnTec, Orochem Technologies, the University of Delaware, Michigan Technological University, the National Renewable Energy Laboratory, and The Boeing Company, to develop a cost-effective hybrid conversion technology for catalytic upgrading of biomass-derived syngas to sustainable alternative jet fuel (SAJF) meeting the price, quality and environmental requirements of the aviation industry. Alternative “synthetic paraffinic kerosene” (SPK) blendstock produced from syngas via “Fischer-Tropsch” (F-T) or from lipids via “hydroprocessing of esters and fatty acids” (HEFA) are currently being used in commercial jet fuel blends containing at least 50% petroleum-based fuel. Thismore » project developed an alternative route to SAJF from ethanol, a type of “alcohol to jet” (ATJ) SPK. The project objective was to demonstrate a pathway that combines syngas fermentation to ethanol with catalytic upgrading of ethanol to sustainable alternative jet fuel and shows attractive overall system economics to drive down the price of biomass-derived jet fuel. The hybrid pathway was to be demonstrated on three biomass feedstocks: corn stover, woody biomass, and third biomass feedstock, cellulosic residues. The objective also included the co-production of chemicals, exemplified by 2,3-Butanediol (2,3-BDO), which can be converted to key chemical intermediates. The team successfully demonstrated that biomass syngas fermentation followed by catalytic conversion is a viable alternative to the Fischer-Tropsch process and produces a fuel with properties comparable to F-T and HEFA SPKs. Plasma gasification and gas fermentation were successfully integrated and demonstrated in continuous fermentations on waste wood, corn stover, and cellulosic bagasse. Gas fermentation was demonstrated to produce ethanol suitable for catalytic upgrading, isolating the upgrading from variations in biomass feed, syngas composition, and impurities. Ethanol feedstocks from all three types of biomass were demonstrated to be comparable to grain derived ethanol and suitable for the LT-PNNL ATJ process. The LT-PNNL ATJ catalytic upgrading process was demonstrated at lab scale for over 2000 hours of continuous operation on a single catalyst load. LanzaTech scaled up the ATJ process, producing 4000 gallons of jet and 600 gallons of diesel for testing and a future proving flight. The LT-PNNL ATJ process, at lab and pilot scale, using commercial grain-based ethanol and steel mill waste gas-based ethanol (“Lanzanol”), produces high-quality fuel-range distillates containing primarily normal paraffins and isoparaffins. The LT-PNNL ATJ fuel has equivalent properties to previously-approved SPKs such as F-T, HEFA, and ATJ from isobutanol, and conforms with critical properties needed to blend with conventional jet fuel. The project showed that the 2,3-BDO fermentation co-product can be separated economically utilizing Simulated Moving Bed (SMB) technology. 2,3-BDO can be catalytically converted to 1,3-butadiene (BD) in a two-step process with at least 70% yield, producing a chemical intermediate suitable for downstream applications. Technoeconomic and life cycle analyses of the biomass to jet process with and without 2,3-BDO production showed that capital costs are sensitive to the proportion of the 2,3-BDO co-product and biomass feedstock. The co-product 2,3-BDO, converted through to BD, significantly reduces the cash cost of production of the hydrocarbon fuels. Life cycle GHG emissions of ATJ SPK produced from biomass using a steam gasification system are projected to be significantly lower than those of conventional jet fuel. The project demonstrated that a high quality ATJ SPK, can be produced from biomass via a hybrid gas fermentation/catalytic route. Validation of the LT-PNNL ATJ process using a variety of ethanol feedstocks demonstrated the viability of a future model of distributed ATJ production, in which ethanol may be produced at multiple facilities from local feedstocks and shipped to a central facility for conversion. The project demonstrated that co-production of chemicals has the potential to reduce jet cost of production, thereby accelerating commercial production of SAJF from biomass.« less

  18. Design and Development of a Nearable Wireless System to Control Indoor Air Quality and Indoor Lighting Quality.

    PubMed

    Salamone, Francesco; Belussi, Lorenzo; Danza, Ludovico; Galanos, Theodore; Ghellere, Matteo; Meroni, Italo

    2017-05-04

    The article describes the results of the project "open source smart lamp" aimed at designing and developing a smart object able to manage and control the indoor environmental quality (IEQ) of the built environment. A first version of this smart object, built following a do-it-yourself (DIY) approach using a microcontroller, an integrated temperature and relative humidity sensor, and techniques of additive manufacturing, allows the adjustment of the indoor thermal comfort quality (ICQ), by interacting directly with the air conditioner. As is well known, the IEQ is a holistic concept including indoor air quality (IAQ), indoor lighting quality (ILQ) and acoustic comfort, besides thermal comfort. The upgrade of the smart lamp bridges the gap of the first version of the device providing the possibility of interaction with the air exchange unit and lighting system in order to get an overview of the potential of a nearable device in the management of the IEQ. The upgraded version was tested in a real office equipped with mechanical ventilation and an air conditioning system. This office was occupied by four workers. The experiment is compared with a baseline scenario and the results show how the application of the nearable device effectively optimizes both IAQ and ILQ.

  19. Design and Development of a Nearable Wireless System to Control Indoor Air Quality and Indoor Lighting Quality

    PubMed Central

    Salamone, Francesco; Belussi, Lorenzo; Danza, Ludovico; Galanos, Theodore; Ghellere, Matteo; Meroni, Italo

    2017-01-01

    The article describes the results of the project “open source smart lamp” aimed at designing and developing a smart object able to manage and control the indoor environmental quality (IEQ) of the built environment. A first version of this smart object, built following a do-it-yourself (DIY) approach using a microcontroller, an integrated temperature and relative humidity sensor, and techniques of additive manufacturing, allows the adjustment of the indoor thermal comfort quality (ICQ), by interacting directly with the air conditioner. As is well known, the IEQ is a holistic concept including indoor air quality (IAQ), indoor lighting quality (ILQ) and acoustic comfort, besides thermal comfort. The upgrade of the smart lamp bridges the gap of the first version of the device providing the possibility of interaction with the air exchange unit and lighting system in order to get an overview of the potential of a nearable device in the management of the IEQ. The upgraded version was tested in a real office equipped with mechanical ventilation and an air conditioning system. This office was occupied by four workers. The experiment is compared with a baseline scenario and the results show how the application of the nearable device effectively optimizes both IAQ and ILQ. PMID:28471398

  20. Instrument control software development process for the multi-star AO system ARGOS

    NASA Astrophysics Data System (ADS)

    Kulas, M.; Barl, L.; Borelli, J. L.; Gässler, W.; Rabien, S.

    2012-09-01

    The ARGOS project (Advanced Rayleigh guided Ground layer adaptive Optics System) will upgrade the Large Binocular Telescope (LBT) with an AO System consisting of six Rayleigh laser guide stars. This adaptive optics system integrates several control loops and many different components like lasers, calibration swing arms and slope computers that are dispersed throughout the telescope. The purpose of the instrument control software (ICS) is running this AO system and providing convenient client interfaces to the instruments and the control loops. The challenges for the ARGOS ICS are the development of a distributed and safety-critical software system with no defects in a short time, the creation of huge and complex software programs with a maintainable code base, the delivery of software components with the desired functionality and the support of geographically distributed project partners. To tackle these difficult tasks, the ARGOS software engineers reuse existing software like the novel middleware from LINC-NIRVANA, an instrument for the LBT, provide many tests at different functional levels like unit tests and regression tests, agree about code and architecture style and deliver software incrementally while closely collaborating with the project partners. Many ARGOS ICS components are already successfully in use in the laboratories for testing ARGOS control loops.

  1. CSU's MWV Observatory: A Facility for Research, Education and Outreach

    NASA Astrophysics Data System (ADS)

    Hood, John; Carpenter, N. D.; McCarty, C. B.; Samford, J. H.; Johnson, M.; Puckett, A. W.; Williams, R. N.; Cruzen, S. T.

    2014-01-01

    The Mead Westvaco Observatory (MWVO), located in Columbus State University's Coca-Cola Space Science Center, is dedicated to education and research in astronomy through hands-on engagement and public participation. The MWVO has recently received funding to upgrade from a 16-inch Meade LX-200 telescope to a PlaneWave CDK 24-inch Corrected Dall-Kirkham Astrograph telescope. This and other technological upgrades will allow this observatory to stream live webcasts for astronomical events, allowing a worldwide public audience to become a part of the growing astronomical community. This poster will explain the upgrades that are currently in progress as well as the results from the current calibrations. The goal of these upgrades is to provide facilities capable of both research-class projects and widespread use in education and public outreach. We will present our initial calibration and tests of the observatory equipment, as well as its use in webcasts of astronomical events, in solar observing through the use of specialized piggy-backed telescopes, and in research into such topics as asteroids, planetary and nebula imaging. We will describe a pilot research project on asteroid orbit refinement and light curves, to be carried out by Columbus State University students. We will also outline many of the K-12 educational and public outreach activities we have designed for these facilities. Support and funding for the acquisition and installation of the new PlaneWave CDK 24 has been provided by the International Museum and Library Services via the Museums for America Award.

  2. Human Factors Principles in Information Dashboard Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hugo, Jacques V.; St. Germain, Shawn

    When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state conceptsmore » for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.« less

  3. Lessons Learned in Process Reengineering at a Community College.

    ERIC Educational Resources Information Center

    Jaacks, Gayle E.; Kurtz, Michael

    1999-01-01

    Summarizes the successful reengineering of business processes to take full advantage of new functionality in a vendor system upgrade at Western Iowa Tech Community College. Suggests that to truly benefit from implementing new systems or major system upgrades, an institution must streamline processes, eliminate duplication of effort, and examine…

  4. Human-machine interface (HMI) report for 241-SY-101 data acquisition [and control] system (DACS) upgrade study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Truitt, R.W.

    1997-10-22

    This report provides an independent evaluation of information for a Windows based Human Machine Interface (HMI) to replace the existing DOS based Iconics HMI currently used in the Data Acquisition and Control System (DACS) used at Tank 241-SY-101. A fundamental reason for this evaluation is because of the difficulty of maintaining the system with obsolete, unsupported software. The DACS uses a software operator interface (Genesis for DOS HMI) that is no longer supported by its manufacturer, Iconics. In addition to its obsolescence, it is complex and difficult to train additional personnel on. The FY 1997 budget allocated $40K for phasemore » 1 of a software/hardware upgrade that would have allowed the old DOS based system to be replaced by a current Windows based system. Unfortunately, budget constraints during FY 1997 has prompted deferral of the upgrade. The upgrade needs to be performed at the earliest possible time, before other failures render the system useless. Once completed, the upgrade could alleviate other concerns: spare pump software may be able to be incorporated into the same software as the existing pump, thereby eliminating the parallel path dilemma; and the newer, less complex software should expedite training of future personnel, and in the process, require that less technical time be required to maintain the system.« less

  5. The Cost of Distribution System Upgrades to Accommodate Increasing Penetrations of Distributed Photovoltaic Systems on Real Feeders in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Horowitz, Kelsey A; Ding, Fei; Mather, Barry A

    The increasing deployment of distributed photovoltaic systems (DPV) can impact operations at the distribution level and the transmission level of the electric grid. It is important to develop and implement forward-looking approaches for calculating distribution upgrade costs that can be used to inform system planning, market and tariff design, cost allocation, and other policymaking as penetration levels of DPV increase. Using a bottom-up approach that involves iterative hosting capacity analysis, this report calculates distribution upgrade costs as a function of DPV penetration on three real feeders - two in California and one in the Northeastern United States.

  6. Conceptual design of the cryostat for the new high luminosity (HL-LHC) triplet magnets

    NASA Astrophysics Data System (ADS)

    Ramos, D.; Parma, V.; Moretti, M.; Eymin, C.; Todesco, E.; Van Weelderen, R.; Prin, H.; Berkowitz Zamora, D.

    2017-12-01

    The High Luminosity LHC (HL-LHC) is a project to upgrade the LHC collider after 2020-2025 to increase the integrated luminosity by about one order of magnitude and extend the physics production until 2035. An upgrade of the focusing triplets insertion system for the ATLAS and CMS experiments is foreseen using superconducting magnets operating in a pressurised superfluid helium bath at 1.9 K. This will require the design and construction of four continuous cryostats, each about sixty meters in length and one meter in diameter, for the final beam focusing quadrupoles, corrector magnets and beam separation dipoles. The design is constrained by the dimensions of the existing tunnel and accessibility restrictions imposing the integration of cryogenic piping inside the cryostat, thus resulting in a very compact integration. As the alignment and position stability of the magnets is crucial for the luminosity performance of the machine, the magnet support system must be carefully designed in order to cope with parasitic forces and thermo-mechanical load cycles. In this paper, we present the conceptual design of the cryostat and discuss the approach to address the stringent and often conflicting requirements of alignment, integration and thermal aspects.

  7. Commissioning of the helium cryogenic system for the HIE- ISOLDE accelerator upgrade at CERN

    NASA Astrophysics Data System (ADS)

    Delruelle, N.; Inglese, V.; Leclercq, Y.; Pirotte, O.; Williams, L.

    2015-12-01

    The High Intensity and Energy ISOLDE (HIE-ISOLDE) project is a major upgrade of the existing ISOLDE and REX-ISOLDE facilities at CERN. The most significant improvement will come from replacing the existing REX accelerating structure by a superconducting linear accelerator (SC linac) composed ultimately of six cryo-modules installed in series, each containing superconducting RF cavities and solenoids operated at 4.5 K. In order to provide the cooling capacity at all temperature levels between 300 K and 4.5 K for the six cryo-modules, an existing helium refrigerator, manufactured in 1986 and previously used to cool the ALEPH magnet during LEP operation from 1989 to 2000, has been refurbished, reinstalled and recommissioned in a dedicated building located next to the HIE-ISOLDE experimental hall. This helium refrigerator has been connected to a new cryogenic distribution line, consisting of a 30-meter long vacuum-insulated transfer line, a 2000-liter storage dewar and six interconnecting valve boxes, one for each cryo-module. This paper describes the whole cryogenic system and presents the commissioning results including the preliminary operation at 4.5 K of the first cryo- module in the experimental hall.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hightower, Marion Michael; Baca, Michael J.; VanderMey, Carissa

    In June 2016, the Department of Energy's (DOE's) Office of Energy Efficiency and Renewable Energy (EERE) in collaboration with the Renewable Energy Branch for the Hawaii State Energy Office (HSEO), the Hawaii Community Development Authority (HCDA), the United States Navy (Navy), and Sandia National Laboratories (Sandia) established a project to 1) assess the current functionality of the energy infrastructure at the Kalaeloa Community Development District, and 2) evaluate options to use both existing and new distributed and renewable energy generation and storage resources within advanced microgrid frameworks to cost-effectively enhance energy security and reliability for critical stakeholder needs during bothmore » short-term and extended electric power outages. This report discusses the results of a stakeholder workshop and associated site visits conducted by Sandia in October 2016 to identify major Kalaeloa stakeholder and tenant energy issues, concerns, and priorities. The report also documents information on the performance and cost benefits of a range of possible energy system improvement options including traditional electric grid upgrade approaches, advanced microgrid upgrades, and combined grid/microgrid improvements. The costs and benefits of the different improvement options are presented, comparing options to see how well they address the energy system reliability, sustainability, and resiliency priorities identified by the Kalaeloa stakeholders.« less

  9. UNAVCO-PBO Southwest Region Network Operations

    NASA Astrophysics Data System (ADS)

    Walls, C. P.; Mann, D.; Basset, A.; Sklar, J.; Jarvis, C.; Pitcher, T.; Lawrence, S.; Greathouse, M.; Feaux, K.

    2012-12-01

    The UNAVCO Southwest region of the Plate Boundary Observatory manages 470 continuously operating GPS stations located principally along the transform system of the San Andreas Fault, Eastern California Shear Zone and the northern Baja peninsula. In the past year, network uptime averaged 98% with greater than 99% data acquisition. Communications range from CDMA modem (314), radio (100), Vsat (30), DSL/T1/other (25) to manual download (1). Thirty-four stations have WXT520 metpacks. Sixty-four stations stream 1 Hz data over the VRS3Net typically with <0.5 second latency. Over 650 maintenance activities were performed during 341 onsite visits out of approximately 346 engineer field days. Within the past year there have been 7 incidences of minor (attempted theft) to moderate vandalism (solar panel stolen) with one total loss of receiver and communications gear. Security was enhanced at these sites through fencing and more secure station configurations. UNAVCO is working with NOAA to stream real-time GPS and met data from PBO stations with WXT520 meteorological sensors and high rate data communications. These streams support watershed and flood analyses for regional early-warning systems related to NOAA's work with California Department of Water Resources. Network-wide NOAA receives a total of 54 streams including stations in Cascadia. In 2008 PBO became the steward of 209 existing network stations ("Nucleus stations") of which 140 are in the SW region that included SCIGN, BARD, BARGEN stations. Due to the mix of incompatible equipment used between PBO and existing network stations a project was undertaken to standardize existing network GPS stations to PBO specifications by upgrading antenna cabling, power systems and enclosures. In 2012 the Nucleus upgrade project was completed.

  10. The ALICE TPC Upgrad

    NASA Astrophysics Data System (ADS)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  11. Adding Interferometer Restoration and Upgrade: Learning by Doing with the NINE Program

    NASA Astrophysics Data System (ADS)

    Saby, Linnea

    2017-01-01

    During the summer of 2016, participants in the National and International Non-Traditional Exchange (NINE) Program were responsible for the restoration and upgrade of N2I2, an instructional interferometer located on New Mexico Tech's Socorro campus. The NINE program is a National Radio Astronomy Observatory (NRAO) initiative geared towards providing training in project management and other STEM functional areas to underrepresented groups around the world. A description of this restoration project illustrates both the experience of a NINE program participant and, more specifically, how principles of engineering and project management were applied to achieve project objectives.N2I2 was created by a joint NRAO-New Mexico Tech (NMT) team and became operational in 2004. The original instrument comprised two ten-foot dishes which recieved signals that were added using a simple power combiner, and data was interpreted using software on computers located in a nearby control room. The theory of adding interferometry was re-discovered for the design of this unique telescope. N2I2 was built using simple hardware with the intention of allowing interested community members and students from middle school to graduate school to learn about the principles of radio astronomy.Unfortunately, between 2008 and 2016 N2I2 was not used on a regular basis and fell into disrepair. NINE program director Lory Wingate accepted the responsibility of restoring the instrument as an experiential learning opportunity for the Socorro, New Mexico NINE team.During their 9 week assignment, the NINE team created a project plan, replaced and upgraded antenna hardware, developed operation and maintenance manuals, and refurbished the control room. A project plan was created for the addition of a third antenna and that plan was successfully carried out during August and September of 2016.Ultimately, functionality was successfully restored and improved, a maintenance plan was put into place, and community interest in the instrument was reignited.

  12. 3D vision upgrade kit for TALON robot

    NASA Astrophysics Data System (ADS)

    Edmondson, Richard; Vaden, Justin; Hyatt, Brian; Morris, James; Pezzaniti, J. Larry; Chenault, David B.; Tchon, Joe; Barnidge, Tracy; Kaufman, Seth; Pettijohn, Brad

    2010-04-01

    In this paper, we report on the development of a 3D vision field upgrade kit for TALON robot consisting of a replacement flat panel stereoscopic display, and multiple stereo camera systems. An assessment of the system's use for robotic driving, manipulation, and surveillance operations was conducted. The 3D vision system was integrated onto a TALON IV Robot and Operator Control Unit (OCU) such that stock components could be electrically disconnected and removed, and upgrade components coupled directly to the mounting and electrical connections. A replacement display, replacement mast camera with zoom, auto-focus, and variable convergence, and a replacement gripper camera with fixed focus and zoom comprise the upgrade kit. The stereo mast camera allows for improved driving and situational awareness as well as scene survey. The stereo gripper camera allows for improved manipulation in typical TALON missions.

  13. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...

  14. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) begins its trek from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  15. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) has exited the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida for its trek along the crawlerway to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  16. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) travels along the crawlerway from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida on its trek to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  17. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) travels along the crawlerway during its trek to Launch Pad 39B at the agency’s Kennedy Space Center in Florida, to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the Vehicle Assembly Building. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carruth, R.C.; Sotos, W.G.

    As the nation`s nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear Plant, a decision was made to replace a major portion of the plant`s protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade.

  19. L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-30

    This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.

  20. PIP-II Transfer Line Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vivoli, A.

    The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the capabilities of the Fermilab existing accelerator complex while simultaneously providing a flexible platform for its future upgrades. The central part of PIP-II project is the construction of a new 800 MeV H- Superconducting (SC) Linac together with upgrades of the Booster and Main Injector synchrotrons. New transfer lines will also be needed to deliver beam to the down-stream accelerators and facilities. In this paper we present themore » recent development of the design of the transfer lines discussing the principles that guided their design, the constraints and requirements imposed by the existing accelerator complex and the following modifications implemented to comply with a better understanding of the limitations and further requirements that emerged during the development of the project.« less

  1. The Air Force's central reference laboratory: maximizing service while minimizing cost.

    PubMed

    Armbruster, D A

    1991-11-01

    The Laboratory Services Branch (Epi Lab) of the Epidemiology Division, Brooks AFB, Texas, is designated by regulation to serve as the Air Force's central reference laboratory, providing clinical laboratory testing support to all Air Force medical treatment facilities (MTFs). Epi Lab recognized that it was not offering the MTFs a service comparable to civilian reference laboratories and that, as a result, the Air Force medical system was spending hundreds of thousands of dollars yearly for commercial laboratory support. An in-house laboratory upgrade program was proposed to and approved by the USAF Surgeon General, as a Congressional Efficiencies Add project, to launch a two-phase initiative consisting of a 1-year field trial of 30 MTFs, followed by expansion to another 60 MTFs. Major components of the program include overnight air courier service to deliver patient samples to Epi Lab, a mainframe computer laboratory information system and electronic reporting of results to the MTFs throughout the CONUS. Application of medical marketing concepts and the Total Quality Management (TQM) philosophy allowed Epi to provide dramatically enhanced reference service at a cost savings of about $1 million to the medical system. The Epi Lab upgrade program represents an innovative problem-solving approach, combining technical and managerial improvements, resulting in substantial patient care service and financial dividends. It serves as an example of successful application of TQM and marketing within the military medical system.

  2. Upgrading the Center for Lightweighting Automotive Materials and Processing - a GATE Center of Excellence at the University of Michigan-Dearborn

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mallick, P. K.

    2012-08-30

    The Center for Lightweighting Materials and Processing (CLAMP) was established in September 1998 with a grant from the Department of Energy’s Graduate Automotive Technology Education (GATE) program. The center received the second round of GATE grant in 2005 under the title “Upgrading the Center for Lightweighting Automotive Materials and Processing”. Using the two grants, the Center has successfully created 10 graduate level courses on lightweight automotive materials, integrated them into master’s and PhD programs in Automotive Systems Engineering, and offered them regularly to the graduate students in the program. In addition, the Center has created a web-based lightweight automotive materialsmore » database, conducted research on lightweight automotive materials and organized seminars/symposia on lightweight automotive materials for both academia and industry. The faculty involved with the Center has conducted research on a variety of topics related to design, testing, characterization and processing of lightweight materials for automotive applications and have received numerous research grants from automotive companies and government agencies to support their research. The materials considered included advanced steels, light alloys (aluminum, magnesium and titanium) and fiber reinforced polymer composites. In some of these research projects, CLAMP faculty have collaborated with industry partners and students have used the research facilities at industry locations. The specific objectives of the project during the current funding period (2005 – 2012) were as follows: (1) develop new graduate courses and incorporate them in the automotive systems engineering curriculum (2) improve and update two existing courses on automotive materials and processing (3) upgrade the laboratory facilities used by graduate students to conduct research (4) expand the Lightweight Automotive Materials Database to include additional materials, design case studies and make it more accessible to outside users (5) provide support to graduate students for conducting research on lightweight automotive materials and structures (6) provide industry/university interaction through a graduate certificate program on automotive materials and technology idea exchange through focused seminars and symposia on automotive materials.« less

  3. The Capabilities of the upgraded MIPP experiment with respect to Hypernuclear physics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raja, Rajendran

    2012-01-01

    We describe the state of analysis of the MIPP experiment, its plans to upgrade the experiment and the impact such an upgraded experiment will have on hypernuclear physics. The upgraded MIPP experiment is designed to measure the properties of strong interaction spectra form beams {pi}{sup {+-}}, K{sup {+-}}, and p{sup {+-}}, for momenta ranging from 1 GeV/c to 120 GeV/c. The layout of the apparatus in the data taken so far can be seen in Figure 1. The centerpiece of the experiment is the time projection chamber, which is followed by the time of flight counter, a multi-cell Cerenkov detectormore » and the RICH detector. The TPC can identify charged particles with momenta less than 1 GeV/c using dE/dx, the time of flight will identify particles below approximately 2 GeV/c, the multi-cell Cerenkov detector is operational from 2.5 GeV/c to 14 GeV/c and the RICH detector can identify particles up to 120 GeVc. Following this is an EM and hadronic calorimeter capable of detecting forward going neutrons and photons. The experiment has been busy analyzing its data taken on various nuclei and beam conditions. The table 2 shows the data taken by MIPP I to date. We have almost complete acceptance in the forward hemisphere in the lab using the TPC. The reconstruction capabilities of the TPC can be seen in Figure 3. The particle identification capabilities of the TPC can be seen in Figure 4. The time of flight system provides further measurement of the particles with momenta less than 2 GeV/c. Figure 5 shows the time of flight data where a kaon peak is clearly visible.« less

  4. PTC test bed upgrades to provide ACSES testing support capabilities at transportation technology center.

    DOT National Transportation Integrated Search

    2015-06-01

    FRA Task Order 314 upgraded the Positive Train Control (PTC) Test Bed at the Transportation Technology Center to support : testing of PTC systems, components, and related equipment associated with the Advanced Civil Speed Enforcement System : (ACSES)...

  5. TAMU: Blueprint for A New Space Mission Operations System Paradigm

    NASA Technical Reports Server (NTRS)

    Ruszkowski, James T.; Meshkat, Leila; Haensly, Jean; Pennington, Al; Hogle, Charles

    2011-01-01

    The Transferable, Adaptable, Modular and Upgradeable (TAMU) Flight Production Process (FPP) is a System of System (SOS) framework which cuts across multiple organizations and their associated facilities, that are, in the most general case, in geographically disperse locations, to develop the architecture and associated workflow processes of products for a broad range of flight projects. Further, TAMU FPP provides for the automatic execution and re-planning of the workflow processes as they become operational. This paper provides the blueprint for the TAMU FPP paradigm. This blueprint presents a complete, coherent technique, process and tool set that results in an infrastructure that can be used for full lifecycle design and decision making during the flight production process. Based on the many years of experience with the Space Shuttle Program (SSP) and the International Space Station (ISS), the currently cancelled Constellation Program which aimed on returning humans to the moon as a starting point, has been building a modern model-based Systems Engineering infrastructure to Re-engineer the FPP. This infrastructure uses a structured modeling and architecture development approach to optimize the system design thereby reducing the sustaining costs and increasing system efficiency, reliability, robustness and maintainability metrics. With the advent of the new vision for human space exploration, it is now necessary to further generalize this framework to take into consideration a broad range of missions and the participation of multiple organizations outside of the MOD; hence the Transferable, Adaptable, Modular and Upgradeable (TAMU) concept.

  6. Integration Process for the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Gill, Tracy; Merbitz, Jerad; Kennedy, Kriss; Tn, Terry; Toups, Larry; Howe, A. Scott; Smitherman, David

    2011-01-01

    The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities. The HDU previously served as a test bed for testing technologies and sub-systems in a terrestrial surface environment. in 2010 in the Pressurized Excursion Module (PEM) configuration. Due to the amount of work involved to make the HDU project successful, the HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators The size of the team and number of systems involved With the HDU makes Integration a complicated process. However, because the HDU shell manufacturing is complete, the team has a head start on FY--11 integration activities and can focus on integrating upgrades to existing systems as well as integrating new additions. To complete the development of the FY-11 HDU from conception to rollout for operations in July 2011, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads. The highlighted HDU work for FY-11 will focus on performing upgrades to the PEM configuration, adding the X-Hab as a second level, adding a new porch providing the astronauts a larger work area outside the HDU for EVA preparations, and adding a Hygiene module. Together these upgrades result in a prototype configuration of the Deep Space Habitat (DSH), an element under evaluation by NASA's Human Exploration Framework Team (HEFT) Scheduled activates include early fit-checks and the utilization of a Habitat avionics test bed prior to installation into HDU. A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development. Modeling tools have been effective in hardware systems layout, cable routing, sub-system interface length estimation and human factors analysis. Decision processes on integration and use of all new subsystems will be defined early in the project to maximize the efficiency of both integration and field operations. In addition a series of tailored design reviews are utilized to quickly define the systems and their integration into the DSH configuration. These processes are necessary to ensure activities, such as partially reversing integration of the X-Hab second story of the HDU and deploying and stowing the new work porch for transportation to the JSC Rock Yard and to the Arizona Black Point Lava Flow Site are performed with minimal or no complications. In addition, incremental test operations leading up to an Integrated systems test allows for an orderly systems test program. For FY-11 activities, the HDU DSH will act as a laboratory utilizing a new X-Hab inflatable second floor with crew habitation features. In addition to the day to day operations involving maintenance of the HDU and exploring the surrounding terrain, testing and optimizing the use of the new X-Hab, work porch, Hygiene Module, and other sub-system enhancements will be the focus of the FY-11 test objectives. The HDU team requires a successful integration strategy using a variety of tools and approaches to prepare the DSH for these test objectives. In a challenging environment where the prototyping influences the system design, as well as Vice versa, results of the HDU DSH field tests will influence future designs of habitat systems.

  7. Timing of Technology Upgrades: A Case of Enterprise Systems

    ERIC Educational Resources Information Center

    Claybaugh, Craig C.

    2010-01-01

    Technology upgrades are an inevitable part of dealing with any man-made invention utilized for productive gain. One key technology used for productive gain within a firm is enterprise software, specifically a firm's Enterprise Resource Planning (ERP) system. After the adoption of an ERP system, an organization is perpetually faced with the…

  8. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    NASA Technical Reports Server (NTRS)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  9. Upgrades to the Probabilistic NAS Platform Air Traffic Simulation Software

    NASA Technical Reports Server (NTRS)

    Hunter, George; Boisvert, Benjamin

    2013-01-01

    This document is the final report for the project entitled "Upgrades to the Probabilistic NAS Platform Air Traffic Simulation Software." This report consists of 17 sections which document the results of the several subtasks of this effort. The Probabilistic NAS Platform (PNP) is an air operations simulation platform developed and maintained by the Saab Sensis Corporation. The improvements made to the PNP simulation include the following: an airborne distributed separation assurance capability, a required time of arrival assignment and conformance capability, and a tactical and strategic weather avoidance capability.

  10. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  11. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  12. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  13. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  14. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  15. The Subaru Coronagraphic Extreme AO Project

    NASA Astrophysics Data System (ADS)

    Martinache, Frantz; Guyon, O.; Lozi, J.; Tamura, M.; Hodapp, K.; Suzuki, R.; Hayano, Y.; McElwain, M. W.

    2009-01-01

    While the existence of large numbers of extrasolar planets around solar type stars has been unambiguously demonstrated by radial velocity, transit and microlensing surveys, attempts at direct imaging with AO-equipped large telescopes remain unsuccessful. Because they supposedly offer more favorable contrast ratios, young systems consitute prime targets for imaging. Such observations will provide key insights on the formation and early evolution of planets and disks. Current surveys are limited by modest AO performance which limits inner working angle to 0.2", and only reach maximum sensitivity outside 1". This translates into orbital distances greater than 10 AU even on most nearby systems, while only 5 % of the known exoplanets have a semimajor axis greater than 10 AU. This calls for a major change of approach in the techniques used for direct imaging of the direct vicinity of stars. A sensible way to do the job is to combine coronagraphy and Extreme AO. Only accurate and fast control of the wavefront will permit the detection of high contrast planetary companions within 10 AU. The SCExAO system, currently under assembly, is an upgrade of the HiCIAO coronagraphic differential imaging camera, mounted behind the 188-actuator curvature AO system on Subaru Telescope. This platform includes a 1000-actuator MEMS deformable mirror for high accuracy wavefront correction and a PIAA coronagraph which delivers high contrast at 0.05" from the star (5 AU at 100 pc). Key technologies have been validated in the laboratory: high performance wavefront sensing schemes, spider vanes and central obstruction removal, and lossless beam apodization. The project is designed to be highly flexible to continuously integrate new technologies with high scientific payoff. Planned upgrades include an integral field unit for spectral characterization of planets/disks and a non-redundant aperture mask to push the performance of the system toward separations less than lambda/D.

  16. The "Global 30" Project and Japanese Higher Education Reform: An Example of a "Closing in" or an "Opening up"?

    ERIC Educational Resources Information Center

    Burgess, Chris; Gibson, Ian; Klaphake, Jay; Selzer, Mark

    2010-01-01

    The Global 30 Project, a new Japanese Government initiative that aims to upgrade a number of existing universities to form a select hub of elite universities for receiving and educating international students, has come in for considerable criticism. Using the dual concepts of "kokusaika" (internationalisation) and "gurobaruka"…

  17. OEO Programs for Migrant and Seasonal Farm Workers. Title IIIB EOA Projects.

    ERIC Educational Resources Information Center

    Office of Economic Opportunity, Washington, DC.

    The major thrust of Title III-B (Economic Opportunity Act) programs is to prepare migrant and seasonal farm workers for upgraded jobs and to prepare entire farm worker families for alternatives to farm work if they so desire. These alternatives, supported through projects for adult heads of households, emphasize skill training in preparation for…

  18. 76 FR 28505 - Okanogan Public Utility District No. 1 of Okanogan County, WA; Notice of Availability of Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ....5 miles of new and upgraded access roads. The Enloe Project would operate automatically in a run-of... run-of-river and implementing agency-recommended ramping rates downstream of the project during... effects on geology and soils and water quality. Run-of-river operation would minimize effects on aquatic...

  19. 76 FR 50757 - Notice of Lodging of a Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... March 2023 by completing sewer separation projects and upgrades at an approximate cost of $4.2 million... and (3) establish and operate a yard waste pick-up and recycling program for Elkins' residents as a Supplemental Environmental Project (``SEP''). The Department of Justice will receive for a period of thirty (30...

  20. TU-G-BRD-02: Automated Systematic Quality Assurance Program for Radiation Oncology Information System Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, B; Yi, B; Eley, J

    Purpose: To: (1) describe an independent, automated, systematic software-based protocol for verifying clinical data accuracy/integrity for mitigation of data corruption/loss risks following radiation oncology information system (ROIS) upgrades; and (2) report on application of this approach in an academic/community practice environment. Methods: We propose a robust approach to perform quality assurance on the ROIS after an upgrade, targeting four data sources: (1) ROIS relational database; (2) ROIS DICOM interface; (3) ROIS treatment machine data configuration; and (4) ROIS-generated clinical reports. We investigated the database schema for differences between pre-/post-upgrade states. Paired DICOM data streams for the same object (such asmore » RT-Plan/Treatment Record) were compared between pre-/post-upgrade states for data corruption. We examined machine configuration and related commissioning data files for changes and corruption. ROIS-generated treatment appointment and treatment parameter reports were compared to ensure patient encounter and treatment plan accuracy. This protocol was supplemented by an end-to-end clinical workflow test to verify essential ROI functionality and integrity of components interfaced during patient care chain of activities. We describe the implementation of this protocol during a Varian ARIA system upgrade at our clinic. Results: We verified 1,638 data tables with 2.4 billion data records. For 222 under-treatment patients, 605 DICOM RT plans and 13,480 DICOM treatment records retrieved from the ROIS DICOM interface were compared, with no differences in fractions, doses delivered, or treatment parameters. We identified 82 new data tables and 78 amended/deleted tables consistent with the upgrade. Reports for 5,073 patient encounters over a 2-week horizon were compared and were identical to those before the upgrade. Content in 12,237 xml machine files was compared, with no differences identified. Conclusion: An independent QA/validation approach for ROIS upgrades was developed and implemented at our clinic. The success of this approach ensures a robust QA of ROIS upgrades without manual paper/electronic checks and associated intensive labor.« less

  1. Project RavenCare: global multimedia telemedicine in Alaska

    NASA Astrophysics Data System (ADS)

    Tohme, Walid G.; Collmann, Jeff R.; Mun, Seong K.; Vastola, David J.

    1995-05-01

    Project RavenCare is a testbed for assessing the utility of teleradiology, telemedicine and electronic patient records systems for delivering health care to Native Alaskans in remote villages. It is being established as a joint project between the department of radiology at Georgetown University Medical Center and the Southeast Alaska Regional Health Corporation (SEARHC) in Sitka, Alaska. This initiative will establish a sustained routine clinical multimedia telemedicine support for a village clinic in Hoonah, Alaska and a regional hospital in Sitka. It will link the village clinic in Hoonah to Mt. Edgecumbe Hospital in Sitka. This regional hospital will in turn be linked to Georgetown University Hospital through the T1- VSAT (very small aperture terminal) of the NASA-ACTS (Advanced Communication Technology Satellite). Regional physicians in Hoonah lack support in providing relatively routine care in areas such as radiology and pathology. This project is an initial step in a general plan to upgrade telecommunications in the health care system of the Southeast Alaska region and will address aspects of two problems; limited communication between the village health clinics and the hospital and lack of subspecialty support for hospital-based physicians in Sitka.

  2. Status of the University of Rochester tandem upgrade

    NASA Astrophysics Data System (ADS)

    Cross, Clinton; Miller, Thomas

    1986-05-01

    The status of the University of Rochester tandem Van de Graaff accelerator upgrade is reviewed. The accelerator upgrade to 18 MV consists of extended tubes, shielded resistors, dead-section ion pumping, two rotating insulating power shaft systems to provide power to the dead sections and terminal, and a pelletron charging system to replace the charging belt. Control of many of the accelerator operating systems will be done by two IBM personal computers. The negative ion injector diffusion pump, isolation transformer, preacceleration high-voltage power supply, and high-voltage corona enclosure will all be replaced. Finally, the SF6 gas handling system will be improved with the addition of a second set of gas dryers and a larger recirculating pump.

  3. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  4. Development of HWIL Testing Capabilities for Satellite Target Emulation at AEDC

    NASA Astrophysics Data System (ADS)

    Lowry, H.; Crider, D.; Burns, J.; Thompson, R.; Goldsmith, G., II; Sholes, W.

    Programs involved in Space Situational Awareness (SSA) need the capability to test satellite sensors in a Hardware-in-the-Loop (HWIL) environment. Testing in a ground system avoids the significant cost of on-orbit test targets and the resulting issues such as debris mitigation, and in-space testing implications. The space sensor test facilities at AEDC consist of cryo-vacuum chambers that have been developed to project simulated targets to air-borne, space-borne, and ballistic platforms. The 7V chamber performs calibration and characterization of surveillance and seeker systems, as well as some mission simulation. The 10V chamber is being upgraded to provide real-time target simulation during the detection, acquisition, discrimination, and terminal phases of a seeker mission. The objective of the Satellite Emulation project is to upgrade this existing capability to support the ability to discern and track other satellites and orbital debris in a HWIL capability. It would provide a baseline for realistic testing of satellite surveillance sensors, which would be operated in a controlled environment. Many sensor functions could be tested, including scene recognition and maneuvering control software, using real interceptor hardware and software. Statistically significant and repeatable datasets produced by the satellite emulation system can be acquired during such test and saved for further analysis. In addition, the robustness of the discrimination and tracking algorithms can be investigated by a parametric analysis using slightly different scenarios; this will be used to determine critical points where a sensor system might fail. The radiometric characteristics of satellites are expected to be similar to the targets and decoys that make up a typical interceptor mission scenario, since they are near ambient temperature. Their spectral reflectivity, emissivity, and shape must also be considered, but the projection systems employed in the 7V and 10V chambers should be capable of providing the simulation of satellites as well. There may also be a need for greater radiometric intensity or shorter time response. An appropriate satellite model is integral to the scene generation process to meet the requirements of SSA programs. The Kinetic Kill Vehicle Hardware-in-the-Loop Simulator (KHILS) facility and the Guided Weapons Evaluation Facility (GWEF), both at Eglin Air Force Base, FL are assisting in developing the scene projection hardware, based on their significant test experience using resistive emitter arrays to test interceptors in a real-time environment. Army Aviation and Missile Research & Development Command (AMRDEC) will develop the Scene Generation System for the real-time mission simulation.

  5. Shuttle: forever young?

    PubMed

    Sietzen, Frank

    2002-01-01

    NASA has started a 4-phase program of upgrades designed to increase safety and extend use of the space shuttles through the year 2020. Phase I is aimed at improving vehicle safety and supporting the space station. Phase II is aimed at combating obsolescence and includes a checkout launch and control system and protection from micrometeoroids and orbital debris. Phase III is designed to expand or enhance the capabilities of the shuttle and includes development of an auxiliary power unit, avionics, a channel-wall nozzle, extended nose landing gear, long-life fuel cells, a nontoxic orbital maneuvering system/reaction control system, and a water membrane evaporator. Phase IV is aimed at design of system changes that would alter the shuttle mold line and configuration; projects include a five-segment solid rocket booster, liquid flyback boosters, and a crew escape module.

  6. Frequently Asked Questions about Energy Savings Plus Health

    EPA Pesticide Factsheets

    The Energy Savings Plus Health Guide equips school districts to integrate indoor air quality protections into school energy efficiency retrofits and other building upgrade projects. This page asks and answers Frequently-Asked Questions.

  7. 28 CFR 115.18 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...

  8. 28 CFR 115.18 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...

  9. 28 CFR 115.18 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...

  10. VISIR upgrade overview and status

    NASA Astrophysics Data System (ADS)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  11. LLE 1995 annual report, October 1994--September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    The fiscal year ending September 1995 (FY95) concluded the third year of the cooperative agreement (DE-FC03-92SF19460) with the U.S. Department of Energy (DOE). This report summarizes research at the Laboratory for Laser Energetics (LLE) and reports on the successful completion of the OMEGA Upgrade. Previous annual reports describe the OMEGA Upgrade design. The preliminary design for the system was complete in October 1989 and the detailed design started in October 1990. The original 24-beam OMEGA system was decommissioned in December 1992 as construction for the OMEGA Upgrade began. We discuss the initial performance results (p. 99) of the upgraded OMEGAmore » laser system. All acceptance tests were completed, and we demonstrated that all 60 beams can irradiate a target with more energy and better beam balance than was required by DOE`s acceptance criteria. We are most proud that all program milestones were met or exceeded, and that the system was completed on time and on budget.« less

  12. Space Adaptation of Active Mirror Segment Concepts

    NASA Technical Reports Server (NTRS)

    Ames, Gregory H.

    1999-01-01

    This report summarizes the results of a three year effort by Blue Line Engineering Co. to advance the state of segmented mirror systems in several separate but related areas. The initial set of tasks were designed to address the issues of system level architecture, digital processing system, cluster level support structures, and advanced mirror fabrication concepts. Later in the project new tasks were added to provide support to the existing segmented mirror testbed at Marshall Space Flight Center (MSFC) in the form of upgrades to the 36 subaperture wavefront sensor. Still later, tasks were added to build and install a new system processor based on the results of the new system architecture. The project was successful in achieving a number of important results. These include the following most notable accomplishments: 1) The creation of a new modular digital processing system that is extremely capable and may be applied to a wide range of segmented mirror systems as well as many classes of Multiple Input Multiple Output (MIMO) control systems such as active structures or industrial automation. 2) A new graphical user interface was created for operation of segmented mirror systems. 3) The development of a high bit rate serial data loop that permits bi-directional flow of data to and from as many as 39 segments daisy-chained to form a single cluster of segments. 4) Upgrade of the 36 subaperture Hartmann type Wave Front Sensor (WFS) of the Phased Array Mirror, Extendible Large Aperture (PAMELA) testbed at MSFC resulting in a 40 to 5OX improvement in SNR which in turn enabled NASA personnel to achieve many significant strides in improved closed-loop system operation in 1998. 5) A new system level processor was built and delivered to MSFC for use with the PAMELA testbed. This new system featured a new graphical user interface to replace the obsolete and non-supported menu system originally delivered with the PAMELA system. The hardware featured Blue Line's new stackable processing system which included fiber optic data links, a WFS digital interface, and a very compact and reliable electronics package. The project also resulted in substantial advances in the evolution of concepts for integrated structures to be used to support clusters of segments while also serving as the means to distribute power, timing, and data communications resources. A prototype cluster base was built and delivered that would support a small array of 7 cm mirror segments. Another conceptual design effort led to substantial progress in the area of laminated silicon mirror segments. While finished mirrors were never successfully produced in this exploratory effort, the basic feasibility of the concept was established through a significant amount of experimental development in microelectronics processing laboratories at the University of Colorado in Colorado Springs. Ultimately lightweighted aluminum mirrors with replicated front surfaces were produced and delivered as part of a separate contract to develop integrated segmented mirror assemblies. Overall the project was very successful in advancing segmented mirror system architectures on several fronts. In fact, the results of this work have already served as the basic foundation for the system architectures of several projects proposed by Blue Line for different missions and customers. These include the NMSD and AMSD procurements for NASA's Next Generation Space Telescope, the HET figure maintenance system, and the 1 meter FAST telescope project.

  13. DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DeBolt, Donald; Richmond, Marshall C.; Donelson, Richard K.

    The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbinesmore » with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.« less

  14. Preliminary Results from NASA/GSFC Ka-Band High Rate Demonstration for Near-Earth Communications

    NASA Technical Reports Server (NTRS)

    Wong, Yen; Gioannini, Bryan; Bundick, Steven N.; Miller, David T.

    2004-01-01

    In early 2000, the National Aeronautics and Space Administration (NASA) commenced the Ka-Band Transition Project (KaTP) as another step towards satisfying wideband communication requirements of the space research and earth exploration-satellite services. The KaTP team upgraded the ground segment portion of NASA's Space Network (SN) in order to enable high data rate space science and earth science services communications. The SN ground segment is located at the White Sands Complex (WSC) in New Mexico. NASA conducted the SN ground segment upgrades in conjunction with space segment upgrades implemented via the Tracking and Data Relay Satellite (TDRS)-HIJ project. The three new geostationary data relay satellites developed under the TDRS-HIJ project support the use of the inter-satellite service (ISS) allocation in the 25.25-27.5 GHz band (the 26 GHz band) to receive high speed data from low earth-orbiting customer spacecraft. The TDRS H spacecraft (designated TDRS-8) is currently operational at a 171 degrees west longitude. TDRS I and J spacecraft on-orbit testing has been completed. These spacecraft support 650 MHz-wide Ka-band telemetry links that are referred to as return links. The 650 MHz-wide Ka-band telemetry links have the capability to support data rates up to at least 1.2 Gbps. Therefore, the TDRS-HIJ spacecraft will significantly enhance the existing data rate elements of the NASA Space Network that operate at S-band and Ku-band.

  15. NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems

    NASA Technical Reports Server (NTRS)

    Lawson, B. Michael; Jan, Darrell

    2006-01-01

    Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.

  16. Projection technologies for imaging sensor calibration, characterization, and HWIL testing at AEDC

    NASA Astrophysics Data System (ADS)

    Lowry, H. S.; Breeden, M. F.; Crider, D. H.; Steely, S. L.; Nicholson, R. A.; Labello, J. M.

    2010-04-01

    The characterization, calibration, and mission simulation testing of imaging sensors require continual involvement in the development and evaluation of radiometric projection technologies. Arnold Engineering Development Center (AEDC) uses these technologies to perform hardware-in-the-loop (HWIL) testing with high-fidelity complex scene projection technologies that involve sophisticated radiometric source calibration systems to validate sensor mission performance. Testing with the National Institute of Standards and Technology (NIST) Ballistic Missile Defense Organization (BMDO) transfer radiometer (BXR) and Missile Defense Agency (MDA) transfer radiometer (MDXR) offers improved radiometric and temporal fidelity in this cold-background environment. The development of hardware and test methodologies to accommodate wide field of view (WFOV), polarimetric, and multi/hyperspectral imaging systems is being pursued to support a variety of program needs such as space situational awareness (SSA). Test techniques for the acquisition of data needed for scene generation models (solar/lunar exclusion, radiation effects, etc.) are also needed and are being sought. The extension of HWIL testing to the 7V Chamber requires the upgrade of the current satellite emulation scene generation system. This paper provides an overview of pertinent technologies being investigated and implemented at AEDC.

  17. ResearchEHR: use of semantic web technologies and archetypes for the description of EHRs.

    PubMed

    Robles, Montserrat; Fernández-Breis, Jesualdo Tomás; Maldonado, Jose A; Moner, David; Martínez-Costa, Catalina; Bosca, Diego; Menárguez-Tortosa, Marcos

    2010-01-01

    In this paper, we present the ResearchEHR project. It focuses on the usability of Electronic Health Record (EHR) sources and EHR standards for building advanced clinical systems. The aim is to support healthcare professional, institutions and authorities by providing a set of generic methods and tools for the capture, standardization, integration, description and dissemination of health related information. ResearchEHR combines several tools to manage EHR at two different levels. The internal level that deals with the normalization and semantic upgrading of exiting EHR by using archetypes and the external level that uses Semantic Web technologies to specify clinical archetypes for advanced EHR architectures and systems.

  18. The role of the resid solvent in coprocessing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtis, C.W.

    1995-12-31

    The objective of this project is to determine the role of petroleum resid in coprocessing of coal and resid. The question being asked is whether the resid is a reactant in the system or whether the resid is a merely a diluent that is being simultaneously upgraded? To fulfill the objective the hydrogen transfer from model compounds, naphthenes that represent petroleum resids to model acceptors is being determined. The specificity of different catalytic systems for promoting the hydrogen transfer from naphthenes to model acceptors and to coal is also being determined. In addition the efficacy of hydrogen transfer from andmore » solvancy of whole and specific resid fractions under coprocessing conditions is being determined.« less

  19. National Health Insurance or Incremental Reform: Aim High, or at Our Feet?

    PubMed Central

    Himmelstein, David U.; Woolhandler, Steffie

    2003-01-01

    Single-payer national health insurance could cover the uninsured and upgrade coverage for most Americans without increasing costs; savings on insurance overhead and other bureaucracy would fully offset the costs of improved care. In contrast, proposed incremental reforms are projected to cover a fraction of the uninsured, at great cost. Moreover, even these projections are suspect; reforms of the past quarter century have not stemmed the erosion of coverage. Despite incrementalists’ claims of pragmatism, they have proven unable to shepherd meaningful reform through the political system. While national health insurance is often dismissed as ultra left by the policy community, it is dead center in public opinion. Polls have consistently shown that at least 40%, and perhaps 60%, of Americans favor such reform. PMID:12511395

  20. National Health Insurance or Incremental Reform: Aim High, or at Our Feet?

    PubMed Central

    Himmelstein, David U.; Woolhandler, Steffie

    2008-01-01

    Single-payer national health insurance could cover the uninsured and upgrade coverage for most Americans without increasing costs; savings on insurance overhead and other bureaucracy would fully offset the costs of improved care. In contrast, proposed incremental reforms are projected to cover a fraction of the uninsured, at great cost. Moreover, even these projections are suspect; reforms of the past quarter century have not stemmed the erosion of coverage. Despite incrementalists’ claims of pragmatism, they have proven unable to shepherd meaningful reform through the political system. While national health insurance is often dismissed as ultra left by the policy community, it is dead center in public opinion. Polls have consistently shown that at least 40%, and perhaps 60%, of Americans favor such reform. PMID:18687624

Top