Sample records for systems acquisition project

  1. Acquisition Systems Protection Planning the Manhatten Project: A Case Study

    DTIC Science & Technology

    1994-06-03

    This study examines the counterintelligence and security programs of the Manhattan Project , the United States acquisition of the atomic bomb, using...assessment methodology and counterintelligence techniques and procedures. Acquisition systems, Program protection, Manhattan Project , Atomic bomb, Technology protection, Counterintelligence, Security.

  2. 48 CFR 22.503 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 22.503 Section 22.503 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... Projects 22.503 Policy. (a) Project labor agreements are a tool that agencies may use to promote economy...

  3. 48 CFR 301.607 - Certification of Program and Project Managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Certification of Program and Project Managers. 301.607 Section 301.607 Federal Acquisition Regulations System HEALTH AND HUMAN... Responsibilities 301.607 Certification of Program and Project Managers. ...

  4. Migrating Legacy Systems in the Global Merger & Acquisition Environment

    ERIC Educational Resources Information Center

    Katerattanakul, Pairin; Kam, Hwee-Joo; Lee, James J.; Hong, Soongoo

    2009-01-01

    The MetaFrame system migration project at WorldPharma, while driven by merger and acquisition, had faced complexities caused by both technical challenges and organizational issues in the climate of uncertainties. However, WorldPharma still insisted on instigating this post-merger system migration project. This project served to (1) consolidate the…

  5. 48 CFR 434.004 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....004 Section 434.004 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL... manager will develop, in coordination with the Acquisition Executive or Major Information Technology... approval of the Acquisition Executive or Major Information Technology Systems Executive, a project control...

  6. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false General. 242.7400 Section 242.7400 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  7. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1990-01-01

    Archival reports on developments in programs managed by the JPL Office of Telecommunications and Data Acquisition (TDA) are provided. Topics covered include: DSN advanced systems (tracking and ground-based navigation; communications, spacecraft-ground; and station control and system technology) and DSN systems implementation (capabilities for existing projects; capabilities for new projects; TDA program management and analysis; and Goldstone solar system radar).

  8. Respiratory motion guided four dimensional cone beam computed tomography: encompassing irregular breathing

    NASA Astrophysics Data System (ADS)

    O'Brien, Ricky T.; Cooper, Benjamin J.; Kipritidis, John; Shieh, Chun-Chien; Keall, Paul J.

    2014-02-01

    Four dimensional cone beam computed tomography (4DCBCT) images suffer from angular under sampling and bunching of projections due to a lack of feedback between the respiratory signal and the acquisition system. To address this problem, respiratory motion guided 4DCBCT (RMG-4DCBCT) regulates the gantry velocity and projection time interval, in response to the patient’s respiratory signal, with the aim of acquiring evenly spaced projections in a number of phase or displacement bins during the respiratory cycle. Our previous study of RMG-4DCBCT was limited to sinusoidal breathing traces. Here we expand on that work to provide a practical algorithm for the case of real patient breathing data. We give a complete description of RMG-4DCBCT including full details on how to implement the algorithms to determine when to move the gantry and when to acquire projections in response to the patient’s respiratory signal. We simulate a realistic working RMG-4DCBCT system using 112 breathing traces from 24 lung cancer patients. Acquisition used phase-based binning and parameter settings typically used on commercial 4DCBCT systems (4 min acquisition time, 1200 projections across 10 respiratory bins), with the acceleration and velocity constraints of current generation linear accelerators. We quantified streaking artefacts and image noise for conventional and RMG-4DCBCT methods by reconstructing projection data selected from an oversampled set of Catphan phantom projections. RMG-4DCBCT allows us to optimally trade-off image quality, acquisition time and image dose. For example, for the same image quality and acquisition time as conventional 4DCBCT approximately half the imaging dose is needed. Alternatively, for the same imaging dose, the image quality as measured by the signal to noise ratio, is improved by 63% on average. C-arm cone beam computed tomography systems, with an acceleration up to 200°/s2, a velocity up to 100°/s and the acquisition of 80 projections per second, allow the image acquisition time to be reduced to below 60 s. We have made considerable progress towards realizing a system to reduce projection clustering in conventional 4DCBCT imaging and hence reduce the imaging dose to the patient.

  9. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  10. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  11. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  12. 48 CFR 1552.227-76 - Project employee confidentiality agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Project employee confidentiality agreement. 1552.227-76 Section 1552.227-76 Federal Acquisition Regulations System ENVIRONMENTAL... electrical services, provisions which shall conform substantially to the language of this clause, including...

  13. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less

  14. Requirements management: keeping your technology acquisition project under control.

    PubMed

    Carr, J J

    2000-03-01

    Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done.

  15. The new classic data acquisition system for NPOI

    NASA Astrophysics Data System (ADS)

    Sun, B.; Jorgensen, A. M.; Landavazo, M.; Hutter, D. J.; van Belle, G. T.; Mozurkewich, David; Armstrong, J. T.; Schmitt, H. R.; Baines, E. K.; Restaino, S. R.

    2014-07-01

    The New Classic data acquisition system is an important portion of a new project of stellar surface imaging with the NPOI, funded by the National Science Foundation, and enables the data acquisition necessary for the project. The NPOI can simultaneously deliver beams from 6 telescopes to the beam combining facility, and in the Classic beam combiner these are combined 4 at a time on 3 separate spectrographs with all 15 possible baselines observed. The Classic data acquisition system is limited to 16 of 32 wavelength channels on two spectrographs and limited to 30 s integrations followed by a pause to ush data. Classic also has some limitations in its fringe-tracking capability. These factors, and the fact that Classic incorporates 1990s technology which cannot be easily replaced are motivation for upgrading the data acquisition system. The New Classic data acquisition system is based around modern electronics, including a high-end Stratix FPGA, a 200 MB/s Direct Memory Access card, and a fast modern Linux computer. These allow for continuous recording of all 96 channels across three spectrographs, increasing the total amount of data recorded by a an estimated order of magnitude. The additional computing power on the data acquisition system also allows for the implementation of more sophisticated fringe-tracking algorithms which are needed for the Stellar Surface Imaging project. In this paper we describe the New Classic system design and implementation, describe the background and motivation for the system as well as show some initial results from using it.

  16. Design of Smart-Meter data acquisition device based on Cloud Platform

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-05-01

    In recent years, the government has attached great importance to ‘Four-Meter Unified’ Project. Under the call of national policy, State Grid is participate in building ‘Four-Meter Unified’ Project actively by making use of electricity information acquisition system. In this paper, a new type Smart-Meter data acquisition device based on Cloud Platform is designed according to the newest series of standards Energy Measure and Management System for Electric, Water, Gas and Heat Meter, and this paper introduces the general scheme, main hardware design and main software design for the Smart-Meter data acquisition device.

  17. Particulate and Gaseous Emissions Measurement System (PAGEMS) Project

    NASA Technical Reports Server (NTRS)

    Kostic, Milivoje

    2003-01-01

    Professor Kostic will work on the current UEET program of the Aerosol and Particulate task. This task will focus on: how to acquire experimental data through Labview software how to make the data acquisition system more efficient trouble existing problem of the labview software recommend a better system improve existing system with better data and usually friendly.Three different assignments in this project included:Particle-Size Distribution Data Presentation;Error or Uncertainty Analysis of Measurement Results; and Enhancement of LabVlRN Data Acquisition Program for GRC PAGEMS Project.

  18. A Low-Cost Data Acquisition System for Automobile Dynamics Applications

    PubMed Central

    González, Alejandro; Vinolas, Jordi

    2018-01-01

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources. PMID:29382039

  19. A Low-Cost Data Acquisition System for Automobile Dynamics Applications.

    PubMed

    González, Alejandro; Olazagoitia, José Luis; Vinolas, Jordi

    2018-01-27

    This project addresses the need for the implementation of low-cost acquisition technology in the field of vehicle engineering: the design, development, manufacture, and verification of a low-cost Arduino-based data acquisition platform to be used in <80 Hz data acquisition in vehicle dynamics, using low-cost accelerometers. In addition to this, a comparative study is carried out of professional vibration acquisition technologies and low-cost systems, obtaining optimum results for low- and medium-frequency operations with an error of 2.19% on road tests. It is therefore concluded that these technologies are applicable to the automobile industry, thereby allowing the project costs to be reduced and thus facilitating access to this kind of research that requires limited resources.

  20. Project Copernicus: An Earth observing system

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Hunsaker Aerospace Corporation is presenting this proposal for Project Copernicus to fulfill the need for space-based remote sensing of Earth. Concentration is on data acquisition. Copernicus is designed to be a flexible system of spacecraft in a low near-polar orbit. The goal is to acquire data so that the scientists may begin to understand many Earth processes and interactions. The mission objective of Copernicus is to provide a space-based, remote-sensing measurement data acquisition and transfer system for 15 years. A description of the design project is presented.

  1. Microhole Coiled Tubing Bottom Hole Assemblies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Don Macune

    2008-06-30

    The original objective of the project, to deliver an integrated 3 1/8-inch diameter Measurement While Drilling (MWD) and Logging While Drilling (LWD) system for drilling small boreholes using coiled tubing drilling, has been achieved. Two prototype systems have been assembled and tested in the lab. One of the systems has been successfully tested downhole in a conventional rotary drilling environment. Development of the 3 1/8-inch system has also lead to development and commercialization of a slightly larger 3.5-inch diameter system. We are presently filling customer orders for the 3.5-inch system while continuing with commercialization of the 3 1/8-inch system. Themore » equipment developed by this project will be offered for sale to multiple service providers around the world, enabling the more rapid expansion of both coiled tubing drilling and conventional small diameter drilling. The project was based on the reuse of existing technology whenever possible in order to minimize development costs, time, and risks. The project was begun initially by Ultima Labs, at the time a small company ({approx}12 employees) which had successfully developed a number of products for larger oil well service companies. In September, 2006, approximately 20 months after inception of the project, Ultima Labs was acquired by Sondex plc, a worldwide manufacturer of downhole instrumentation for cased hole and drilling applications. The acquisition provided access to proven technology for mud pulse telemetry, downhole directional and natural gamma ray measurements, and surface data acquisition and processing, as well as a global sales and support network. The acquisition accelerated commercialization through existing Sondex customers. Customer demand resulted in changes to the product specification to support hotter (150 C) and deeper drilling (20,000 psi pressure) than originally proposed. The Sondex acquisition resulted in some project delays as the resistivity collar was interfaced to a different MWD system and also as the mechanical design was revised for the new pressure requirements. However, the Sondex acquisition has resulted in a more robust system, secure funding for completion of the project, and more rapid commercialization.« less

  2. New low noise CCD cameras for Pi-of-the-Sky project

    NASA Astrophysics Data System (ADS)

    Kasprowicz, G.; Czyrkowski, H.; Dabrowski, R.; Dominik, W.; Mankiewicz, L.; Pozniak, K.; Romaniuk, R.; Sitek, P.; Sokolowski, M.; Sulej, R.; Uzycki, J.; Wrochna, G.

    2006-10-01

    Modern research trends require observation of fainter and fainter astronomical objects on large areas of the sky. This implies usage of systems with high temporal and optical resolution with computer based data acquisition and processing. Therefore Charge Coupled Devices (CCD) became so popular. They offer quick picture conversion with much better quality than film based technologies. This work is theoretical and practical study of the CCD based picture acquisition system. The system was optimized for "Pi of The Sky" project. But it can be adapted to another professional astronomical researches. The work includes issue of picture conversion, signal acquisition, data transfer and mechanical construction of the device.

  3. Space science technology: In-situ science. Sample Acquisition, Analysis, and Preservation Project summary

    NASA Technical Reports Server (NTRS)

    Aaron, Kim

    1991-01-01

    The Sample Acquisition, Analysis, and Preservation Project is summarized in outline and graphic form. The objective of the project is to develop component and system level technology to enable the unmanned collection, analysis and preservation of physical, chemical and mineralogical data from the surface of planetary bodies. Technology needs and challenges are identified and specific objectives are described.

  4. Acquisition of Learning by Facilitating Academics (Project ALFA). Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Bruno, Paula

    This report assesses the Acquisition of Learning by Facilitating Academics (Project ALFA), which is designed to assist the academic progress of Haitian students at Lafayette High School in Brooklyn, New York. Project ALFA served a total of 62 students of limited English proficiency who had attended an English-speaking school system for less than 5…

  5. 48 CFR 232.1004 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 232.1004 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Performance-Based Payments 232.1004..., completion criteria and event values along with the projected expenditure profile in order to negotiate the...

  6. System Design Description for the SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ERMI, A.M.

    2000-01-24

    This document describes the hardware and software of the computer subsystems for the Data Acquisition and Control System (DACS) used in mitigation tests conducted on waste tank 241-SY-101 at the Hanford Nuclear Reservation.

  7. Data acquisition system for operational earth observation missions

    NASA Technical Reports Server (NTRS)

    Deerwester, J. M.; Alexander, D.; Arno, R. D.; Edsinger, L. E.; Norman, S. M.; Sinclair, K. F.; Tindle, E. L.; Wood, R. D.

    1972-01-01

    The data acquisition system capabilities expected to be available in the 1980 time period as part of operational Earth observation missions are identified. By data acquisition system is meant the sensor platform (spacecraft or aircraft), the sensors themselves and the communication system. Future capabilities and support requirements are projected for the following sensors: film camera, return beam vidicon, multispectral scanner, infrared scanner, infrared radiometer, microwave scanner, microwave radiometer, coherent side-looking radar, and scatterometer.

  8. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  9. Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

    NASA Technical Reports Server (NTRS)

    Curran, Jerome

    2007-01-01

    The National Aeronautics and Space Administration (NASA) Headquarters chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objective of this effort is to demonstrate and validate alternatives to aliphatic isocyanate polyurethane coatings. Successful completion of this project will result in one or more isocyanate-free coating systems qualified for use at Air Force Space Command (AFSPC) and NASA centers participating in this study. The objective of this project is to qualify the candidates under the specifications for the standard system. This project will compare coating performance of the proposed alternatives to existing coating systems or standards.

  10. Improving a data-acquisition software system with abstract data type components

    NASA Technical Reports Server (NTRS)

    Howard, S. D.

    1990-01-01

    Abstract data types and object-oriented design are active research areas in computer science and software engineering. Much of the interest is aimed at new software development. Abstract data type packages developed for a discontinued software project were used to improve a real-time data-acquisition system under maintenance. The result saved effort and contributed to a significant improvement in the performance, maintainability, and reliability of the Goldstone Solar System Radar Data Acquisition System.

  11. Integrating respiratory gating into a megavoltage cone-beam CT system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang Jenghwa; Sillanpaa, Jussi; Ling, Clifton C.

    2006-07-15

    We have previously described a low-dose megavoltage cone beam computed tomography (MV CBCT) system capable of producing projection image using one beam pulse. In this study, we report on its integration with respiratory gating for gated radiotherapy. The respiratory gating system tracks a reflective marker on the patient's abdomen midway between the xiphoid and umbilicus, and disables radiation delivery when the marker position is outside predefined thresholds. We investigate two strategies for acquiring gated scans. In the continuous rotation-gated acquisition, the linear accelerator (LINAC) is set to the fixed x-ray mode and the gantry makes a 5 min, 360 deg.continuousmore » rotation, during which the gating system turns the radiation beam on and off, resulting in projection images with an uneven distribution of projection angles (e.g., in 70 arcs each covering 2 deg.). In the gated rotation-continuous acquisition, the LINAC is set to the dynamic arc mode, which suspends the gantry rotation when the gating system inhibits the beam, leading to a slightly longer (6-7 min) scan time, but yielding projection images with more evenly distributed projection angles (e.g., {approx}0.8 deg.between two consecutive projection angles). We have tested both data acquisition schemes on stationary (a contrast detail and a thoracic) phantoms and protocol lung patients. For stationary phantoms, a separate motion phantom not visible in the images is used to trigger the RPM system. Frame rate is adjusted so that approximately 450 images (13 MU) are acquired for each scan and three-dimensional tomographic images reconstructed using a Feldkamp filtered backprojection algorithm. The gated rotation-continuous acquisition yield reconstructions free of breathing artifacts. The tumor in parenchymal lung and normal tissues are easily discernible and the boundary between the diaphragm and the lung sharply defined. Contrast-to-noise ratio (CNR) is not degraded relative to nongated scans of stationary phantoms. The continuous rotation-gated acquisition scan also yields tomographic images with discernible anatomic features; however, streak artifacts are observed and CNR is reduced by approximately a factor of 4. In conclusion, we have successfully developed a gated MV CBCT system to verify the patient positioning for gated radiotherapy.« less

  12. ISS Efforts to Fully Utilize its Target Acquisition Capability Serves as an Analog for Future Laser Pointing Communications Systems

    NASA Technical Reports Server (NTRS)

    Jackson, Dan

    2017-01-01

    The ISS is an outstanding platform for developing, testing and refining laser communications systems for future exploration. A recent ISS project which improved ISS communications satellite acquisition performance proves the platform’s utility as a laser communications systems testbed.

  13. Design and Realization of Online Monitoring System of Distributed New Energy and Renewable Energy

    NASA Astrophysics Data System (ADS)

    Tang, Yanfen; Zhou, Tao; Li, Mengwen; Zheng, Guotai; Li, Hao

    2018-01-01

    Aimed at difficult centralized monitoring and management of current distributed new energy and renewable energy generation projects due to great varieties, different communication protocols and large-scale difference, this paper designs a online monitoring system of new energy and renewable energy characterized by distributed deployment, tailorable functions, extendible applications and fault self-healing performance. This system is designed based on international general standard for grid information data model, formulates unified data acquisition and transmission standard for different types of new energy and renewable energy generation projects, and can realize unified data acquisition and real-time monitoring of new energy and renewable energy generation projects, such as solar energy, wind power, biomass energy, etc. within its jurisdiction. This system has applied in Beijing. At present, 576 projects are connected to the system. Good effect is achieved and stability and reliability of the system have been validated.

  14. Acquisition of Stereoscopic Particle Image Velocimetry System for Investigation of Unsteady Flows

    DTIC Science & Technology

    2016-04-30

    SECURITY CLASSIFICATION OF: The objective of the project titled “Acquisition of Stereoscopic Particle Image Velocimetry (S-PIV) System for...Distribution Unlimited UU UU UU UU 30-04-2016 1-Feb-2015 31-Jan-2016 Final Report: Acquisition of Stereoscopic Particle Image Velocimetry System For...ADDRESS (ES) U.S. Army Research Office P.O. Box 12211 Research Triangle Park, NC 27709-2211 Particle Image Velocimetry REPORT DOCUMENTATION PAGE 11

  15. 48 CFR 324.103 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procedures. 324.103 Section 324.103 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS... attached, the Contracting Officer shall inquire about its status and shall obtain a copy from the Project...

  16. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  17. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  18. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  19. 48 CFR 39.102 - Management of risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are not limited to: prudent project management; use of modular contracting; thorough acquisition... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Management of risk. 39.102... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.102 Management of risk. (a) Prior to entering...

  20. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  1. On Board Data Acquisition System with Intelligent Transducers for Unmanned Aerial Vehicles

    NASA Astrophysics Data System (ADS)

    Rochala, Zdzisław

    2012-02-01

    This report presents conclusions from research project no. ON50900363 conducted at the Mechatronics Department, Military University of Technology in the years 2007-2010. As the main object of the study involved the preparation of a concept and the implementation of an avionics data acquisition system intended for research during flight of unmanned aerial vehicles of the mini class, this article presents a design of an avionics system and describes equipment solutions of a distributed measurement system intended for data acquisition consisting of intelligent transducers. The data collected during a flight controlled by an operator confirmed proper operation of the individual components of the data acquisition system.

  2. NASA Data Acquisitions System (NDAS) Software Architecture

    NASA Technical Reports Server (NTRS)

    Davis, Dawn; Duncan, Michael; Franzl, Richard; Holladay, Wendy; Marshall, Peggi; Morris, Jon; Turowski, Mark

    2012-01-01

    The NDAS Software Project is for the development of common low speed data acquisition system software to support NASA's rocket propulsion testing facilities at John C. Stennis Space Center (SSC), White Sands Test Facility (WSTF), Plum Brook Station (PBS), and Marshall Space Flight Center (MSFC).

  3. 48 CFR 301.606-73 - Requirements for continuous learning maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Requirements for continuous learning maintenance. 301.606-73 Section 301.606-73 Federal Acquisition Regulations System HEALTH..., and Responsibilities 301.606-73 Requirements for continuous learning maintenance. Designated Project...

  4. 48 CFR 301.606-73 - Requirements for continuous learning maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Requirements for continuous learning maintenance. 301.606-73 Section 301.606-73 Federal Acquisition Regulations System HEALTH..., and Responsibilities 301.606-73 Requirements for continuous learning maintenance. Designated Project...

  5. Optimized image acquisition for breast tomosynthesis in projection and reconstruction space.

    PubMed

    Chawla, Amarpreet S; Lo, Joseph Y; Baker, Jay A; Samei, Ehsan

    2009-11-01

    Breast tomosynthesis has been an exciting new development in the field of breast imaging. While the diagnostic improvement via tomosynthesis is notable, the full potential of tomosynthesis has not yet been realized. This may be attributed to the dependency of the diagnostic quality of tomosynthesis on multiple variables, each of which needs to be optimized. Those include dose, number of angular projections, and the total angular span of those projections. In this study, the authors investigated the effects of these acquisition parameters on the overall diagnostic image quality of breast tomosynthesis in both the projection and reconstruction space. Five mastectomy specimens were imaged using a prototype tomosynthesis system. 25 angular projections of each specimen were acquired at 6.2 times typical single-view clinical dose level. Images at lower dose levels were then simulated using a noise modification routine. Each projection image was supplemented with 84 simulated 3 mm 3D lesions embedded at the center of 84 nonoverlapping ROIs. The projection images were then reconstructed using a filtered backprojection algorithm at different combinations of acquisition parameters to investigate which of the many possible combinations maximizes the performance. Performance was evaluated in terms of a Laguerre-Gauss channelized Hotelling observer model-based measure of lesion detectability. The analysis was also performed without reconstruction by combining the model results from projection images using Bayesian decision fusion algorithm. The effect of acquisition parameters on projection images and reconstructed slices were then compared to derive an optimization rule for tomosynthesis. The results indicated that projection images yield comparable but higher performance than reconstructed images. Both modes, however, offered similar trends: Performance improved with an increase in the total acquisition dose level and the angular span. Using a constant dose level and angular span, the performance rolled off beyond a certain number of projections, indicating that simply increasing the number of projections in tomosynthesis may not necessarily improve its performance. The best performance for both projection images and tomosynthesis slices was obtained for 15-17 projections spanning an angular are of approximately 45 degrees--the maximum tested in our study, and for an acquisition dose equal to single-view mammography. The optimization framework developed in this framework is applicable to other reconstruction techniques and other multiprojection systems.

  6. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2011-03-18

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library Of Congress,101...Deepwater Acquisition into asset-based Acquisition Program Baselines, the proposed changes align projects that were formerly grouped under...Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite

  7. Data acquisition instruments: Psychopharmacology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartley, D.S. III

    This report contains the results of a Direct Assistance Project performed by Lockheed Martin Energy Systems, Inc., for Dr. K. O. Jobson. The purpose of the project was to perform preliminary analysis of the data acquisition instruments used in the field of psychiatry, with the goal of identifying commonalities of data and strategies for handling and using the data in the most advantageous fashion. Data acquisition instruments from 12 sources were provided by Dr. Jobson. Several commonalities were identified and a potentially useful data strategy is reported here. Analysis of the information collected for utility in performing diagnoses is recommended.more » In addition, further work is recommended to refine the commonalities into a directly useful computer systems structure.« less

  8. 48 CFR 1552.237-70 - Contract publication review procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review procedures. 1552.237-70 Section 1552.237-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION... Project Officer, at least 30 days prior to publication, a copy of any paper, article, or other...

  9. The control and data acquisition structure for the GAMMA-400 space gamma-telescope

    NASA Astrophysics Data System (ADS)

    Arkhangelskiy, Andrey

    2016-07-01

    The GAMMA-400 space project is intended for precision investigation of the cosmic gamma-emission in the energy band from keV region up to several TeV, electrons and positrons fluxes from ˜~1~GeV up to ˜~10~TeV and high energy cosmic-ray nuclei fluxes. A description of the control and data acquisition structure for gamma-telescope involved in the GAMMA 400 space project is given. The technical capabilities of all specialized equipment providing the functioning of the scientific instrumentation and satellite support systems are unified in a single structure. Control of the scientific instruments is maintained using one-time pulse radio commands and program commands transmitted via onboard control system and scientific data acquisition system. Up to 100~GByte of data per day can be transferred to the ground segment of the project. The correctness of the proposed and implemented structure, engineering solutions and electronic elemental base selection has been verified experimentally with the scientific complex prototype in the laboratory conditions.

  10. Contractor relationships and inter-organizational strategies in NASA's R and D acquisition process

    NASA Technical Reports Server (NTRS)

    Guiltinan, J.

    1976-01-01

    Interorganizational analysis of NASA's acquisition process for research and development systems is discussed. The importance of understanding the contractor environment, constraints, and motives in selecting an acquisition strategy is demonstrated. By articulating clear project goals, by utilizing information about the contractor and his needs at each stage in the acquisition process, and by thorough analysis of the inter-organizational relationship, improved selection of acquisition strategies and business practices is possible.

  11. Modular data acquisition system and its use in gas-filled detector readout at ESRF

    NASA Astrophysics Data System (ADS)

    Sever, F.; Epaud, F.; Poncet, F.; Grave, M.; Rey-Bakaikoa, V.

    1996-09-01

    Since 1992, 18 ESRF beamlines are open to users. Although the data acquisition requirements vary a lot from one beamline to another, we are trying to implement a modular data acquisition system architecture that would fit with the maximum number of acquisition projects at ESRF. Common to all of these systems are large acquisition memories and the requirement to visualize the data during an acquisition run and to transfer them quickly after the run to safe storage. We developed a general memory API handling the acquisition memory and its organization and another library that provides calls for transferring the data over TCP/IP sockets. Interesting utility programs using these libraries are the `online display' program and the `data transfer' program. The data transfer program as well as an acquisition control program rely on our well-established `device server model', which was originally designed for the machine control system and then successfully reused in beamline control systems. In the second half of this paper, the acquisition system for a 2D gas-filled detector is presented, which is one of the first concrete examples using the proposed modular data acquisition architecture.

  12. Development of a Naval Supply Systems Command Acquisition Supplement - A Business Practice Improvement

    DTIC Science & Technology

    2015-09-01

    The information reviewed for this project will help the reader understand how acquisition rules and regulations flow down to the acquisition...ACQUISITIONS IN SUPPORT OF OPERATIONS IN AFGHANISTAN Aug-09 N Obsolete 09-26 PASSIVE RADIO FREQUENCY IDENTIFICATION ( RFID ) DFARS COMPLIANCE REPORTING...been made. Many of the instructions and publications refer readers to additional instructions and publications, and often reference specific policy

  13. 48 CFR 1301.671 - Assignment of program and project managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  14. The scientific data acquisition system of the GAMMA-400 space project

    NASA Astrophysics Data System (ADS)

    Bobkov, S. G.; Serdin, O. V.; Gorbunov, M. S.; Arkhangelskiy, A. I.; Topchiev, N. P.

    2016-02-01

    The description of scientific data acquisition system (SDAS) designed by SRISA for the GAMMA-400 space project is presented. We consider the problem of different level electronics unification: the set of reliable fault-tolerant integrated circuits fabricated on Silicon-on-Insulator 0.25 mkm CMOS technology and the high-speed interfaces and reliable modules used in the space instruments. The characteristics of reliable fault-tolerant very large scale integration (VLSI) technology designed by SRISA for the developing of computation systems for space applications are considered. The scalable net structure of SDAS based on Serial RapidIO interface including real-time operating system BAGET is described too.

  15. Defense Acquisition Research Journal (ARJ). Volume 22, Number 3, Issue 74, July 2015

    DTIC Science & Technology

    2016-04-05

    DoD acquisition system and is not limited to government or contractor personnel. • Employees of the federal government (including military personnel...Incentives • Agile Program Management • Incorporating Foreign Military Sales and Direct Contractor Sales Strategies into Programs • Controlling...projected final cost overruns estimated by contractor and government personnel. The comparison shows that the overruns projected by the contractor and

  16. Dew Point Evaporative Comfort Cooling

    DTIC Science & Technology

    2012-11-01

    assisting with the installation of the data acquisition system and multiyear performance testing. Fort Carson engineers worked with the project...partners to design and integrate the Coolerado units into five facilities and designed an innovative rain water catchment system for four units at the...Theater. Mountain Energy Partnership provided invaluable assistance with the design and installation of the data acquisition system , as well as data

  17. Comparison of detectability in step-and-shoot mode and continuous mode digital tomosynthesis systems

    NASA Astrophysics Data System (ADS)

    Lee, Changwoo; Han, Minah; Baek, Jongduk

    2017-03-01

    Digital tomosynthesis system has been widely used in chest, dental, and breast imaging. Since the digital tomosynthesis system provides volumetric images from multiple projection data, structural noise inherent in X-ray radiograph can be reduced, and thus signal detection performance is improved. Currently, tomosynthesis system uses two data acquisition modes: step-and-shoot mode and continuous mode. Several studies have been conducted to compare the system performance of two acquisition modes with respect to spatial resolution and contrast. In this work, we focus on signal detectability in step-and-shoot mode and continuous mode. For evaluation, uniform background is considered, and eight spherical objects with diameters of 0.5, 0.8, 1, 2, 3, 5, 8, 10 mm are used as signals. Projection data with and without spherical objects are acquired in step-and-shoot mode and continuous mode, respectively, and quantum noise are added. Then, noisy projection data are reconstructed by FDK algorithm. To compare the detection performance of two acquisition modes, we calculate task signal-to-noise ratio (SNR) of channelized Hotelling observer with Laguerre-Gauss channels for each spherical object. While the task-SNR values of two acquisition modes are similar for spherical objects larger than 1 mm diameter, step-and-shoot mode yields higher detectability for small signal sizes. The main reason of this behavior is that small signal is more affected by X-ray tube motion blur than large signal. Our results indicate that it is beneficial to use step-and-shoot data acquisition mode to improve the detectability of small signals (i.e., less than 1 mm diameter) in digital tomosynthesis systems.

  18. PROJECT REPORT : Alaska-Metro/Rural Deployment Project CARS/511 – Anchorage Integration

    DOT National Transportation Integrated Search

    2009-03-19

    The Alaska Department of Transportation & Public Facilities (ADOT&PF) initiated the Alaska Travel Information System by joining the Condition Acquisition & Reporting System/511 (CARS/511) Pooled Fund in October 2002. CARS was jointly developed by the...

  19. ALLTEM System User’s Manual, Munitions Management Projects, ALLTEM Multi-Axis Electromagnetic Induction System Demonstration and Validation, Version 1.0

    DTIC Science & Technology

    2012-03-05

    Alarm button. Under the GPS frame are two smaller frames. On the left is a frame with buttons labeled Tractor Guidance and Acquisition Error... GPS ) and the Attitude Heading Reference System (AHRS) data. 5.2 Using the Data Acquisition Simulator Software The simulator and a practice set... acquisition for one polarity of the TX (33ms dead band for relay switching + 33 ms of waveforms). When the GPS is being used this is usually “1”, but may be

  20. A New High Channel-Count, High Scan-Rate, Data Acquisition System for the NASA Langley Transonic Dynamics Tunnel

    NASA Technical Reports Server (NTRS)

    Ivanco, Thomas G.; Sekula, Martin K.; Piatak, David J.; Simmons, Scott A.; Babel, Walter C.; Collins, Jesse G.; Ramey, James M.; Heald, Dean M.

    2016-01-01

    A data acquisition system upgrade project, known as AB-DAS, is underway at the NASA Langley Transonic Dynamics Tunnel. AB-DAS will soon serve as the primary data system and will substantially increase the scan-rate capabilities and analog channel count while maintaining other unique aeroelastic and dynamic test capabilities required of the facility. AB-DAS is configurable, adaptable, and enables buffet and aeroacoustic tests by synchronously scanning all analog channels and recording the high scan-rate time history values for each data quantity. AB-DAS is currently available for use as a stand-alone data system with limited capabilities while development continues. This paper describes AB-DAS, the design methodology, and the current features and capabilities. It also outlines the future work and projected capabilities following completion of the data system upgrade project.

  1. Nonintrusive iris image acquisition system based on a pan-tilt-zoom camera and light stripe projection

    NASA Astrophysics Data System (ADS)

    Yoon, Soweon; Jung, Ho Gi; Park, Kang Ryoung; Kim, Jaihie

    2009-03-01

    Although iris recognition is one of the most accurate biometric technologies, it has not yet been widely used in practical applications. This is mainly due to user inconvenience during the image acquisition phase. Specifically, users try to adjust their eye position within small capture volume at a close distance from the system. To overcome these problems, we propose a novel iris image acquisition system that provides users with unconstrained environments: a large operating range, enabling movement from standing posture, and capturing good-quality iris images in an acceptable time. The proposed system has the following three contributions compared with previous works: (1) the capture volume is significantly increased by using a pan-tilt-zoom (PTZ) camera guided by a light stripe projection, (2) the iris location in the large capture volume is found fast due to 1-D vertical face searching from the user's horizontal position obtained by the light stripe projection, and (3) zooming and focusing on the user's irises at a distance are accurate and fast using the estimated 3-D position of a face by the light stripe projection and the PTZ camera. Experimental results show that the proposed system can capture good-quality iris images in 2.479 s on average at a distance of 1.5 to 3 m, while allowing a limited amount of movement by the user.

  2. The GRID[subscript C] Project: Developing Students' Thinking Skills in a Data-Rich Environment

    ERIC Educational Resources Information Center

    DeLuca, V. William; Lari, Nasim

    2011-01-01

    The purpose of this study was to determine the impact of using renewable energy data, obtained from a comprehensive data acquisition system, on improving students' learning and developing their higher-order learning skills. This study used renewable energy data available through a data acquisition system installed and tested by the Green Research…

  3. 16. Perimeter acquisition radar building room #102, electrical equipment room; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Perimeter acquisition radar building room #102, electrical equipment room; the prime power distribution system. Excellent example of endulum-types shock isolation. The grey cabinet and barrel assemble is part of the polychlorinated biphenyl (PCB) retrofill project - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  4. Will Empowerment of USAF Program Managers Mitigate the Acquisitions Crisis

    DTIC Science & Technology

    2016-06-10

    FAR Federal Acquisition Regulations GAO Government Accountability Office MDAP Major Defense Acquisition Program USAF United States Air Force ix...actually run the project. The Government Accountability Office (GAO),2 along with many other organizations, including Congress in their 2016 National...1 Government Accountability Office (GAO), GAO-06-110, Best Practices: Better Support of Weapons Systems Program Managers Needed to

  5. A System-of-Systems Engineering Approach for Australian Land Force Capability Integration

    DTIC Science & Technology

    2012-09-01

    projects are those that, by their very scale and influence, shape many other projects and existing capabilities. Examples include Land 400 Land...challenges to the inherently single- project acquisition ethos predominant in both the defence and civil sectors. For example , see Henshaw (2012). This is...been applied are SoS- type glue projects , for example Land 19 Phase 7, Ground Based Air Missile Defence, and Land 400, the Land Combat Vehicle System

  6. 48 CFR 22.404-5 - Expiration of project wage determinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Expiration of project wage... Involving Construction 22.404-5 Expiration of project wage determinations. (a) The contracting officer shall make every effort to ensure that contract award is made before expiration of the project wage...

  7. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  8. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  9. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  10. 48 CFR 339.101 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... computers, mobile devices, or portable media to store or process HHS sensitive information that the Project... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 339.101 Policy. (d)(1) The Contracting Officer shall... orders that involve the operation or acquisition of an information technology system (for definition of...

  11. SU-G-JeP3-06: Lower KV Image Dose Are Expected From a Limited-Angle Intra-Fractional Verification (LIVE) System for SBRT Treatments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ding, G; Yin, F; Ren, L

    Purpose: In order to track the tumor movement for patient positioning verification during arc treatment delivery or in between 3D/IMRT beams for stereotactic body radiation therapy (SBRT), the limited-angle kV projections acquisition simultaneously during arc treatment delivery or in-between static treatment beams as the gantry moves to the next beam angle was proposed. The purpose of this study is to estimate additional imaging dose resulting from multiple tomosynthesis acquisitions in-between static treatment beams and to compare with that of a conventional kV-CBCT acquisition. Methods: kV imaging system integrated into Varian TrueBeam accelerators was modeled using EGSnrc Monte Carlo user code,more » BEAMnrc and DOSXYZnrc code was used in dose calculations. The simulated realistic kV beams from the Varian TrueBeam OBI 1.5 system were used to calculate dose to patient based on CT images. Organ doses were analyzed using DVHs. The imaging dose to patient resulting from realistic multiple tomosynthesis acquisitions with each 25–30 degree kV source rotation between 6 treatment beam gantry angles was studied. Results: For a typical lung SBRT treatment delivery much lower (20–50%) kV imaging doses from the sum of realistic six tomosynthesis acquisitions with each 25–30 degree x-ray source rotation between six treatment beam gantry angles were observed compared to that from a single CBCT image acquisition. Conclusion: This work indicates that the kV imaging in this proposed Limited-angle Intra-fractional Verification (LIVE) System for SBRT Treatments has a negligible imaging dose increase. It is worth to note that the MV imaging dose caused by MV projection acquisition in-between static beams in LIVE can be minimized by restricting the imaging to the target region and reducing the number of projections acquired. For arc treatments, MV imaging acquisition in LIVE does not add additional imaging dose as the MV images are acquired from treatment beams directly during the treatment.« less

  12. Multi-Objective Optimization of System Capability Satisficing in Defense Acquisition

    DTIC Science & Technology

    2012-01-01

    of System Capability Satisficing in Defense Acquisition 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Stevens Institute of Technology,School of Systems...Report (SAR) 18. NUMBER OF PAGES 27 19a. NAME OF RESPONSIBLE PERSON a. REPORT unclassified b. ABSTRACT

  13. Proposed Scientific Support to the Land Vehicle Crew Training System (LVCTS) Project Requirements Definition

    DTIC Science & Technology

    2013-01-01

    proposed acquisition of a variety of armoured vehicle simulators for training within the Canadian Forces. The Directorate of Land Requirements (DLR... armoured vehicle operations under the Land Vehicle Crew Training System (LVCTS) project. DLR has published a Letter of Interest (LOI) to solicit input...LVCTS project staff to discuss the intent of the project. Qualification Standards and Training Plans for several military armoured vehicle

  14. The Data Acquisition System for the AAO 2-Degree Field Project

    NASA Astrophysics Data System (ADS)

    Shortridge, K.; Farrell, T. J.; Bailey, J. A.

    1993-01-01

    The software system being produced by AAO to control the new 2-degree field fibre positioner and spectrographs is described. The system has to mesh cleanly with the ADAM systems used at AAO for CCD data acquisition, and has to run on a network of disparate machines including VMS Vaxes, UNIX workstations, and VME systems running VxWorks. The basis of the new system is a task control layer that operates by sending self-defining hierarchically-structured and machine-independent messages.

  15. TRAMP; The next generation data acquisition for RTP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    van Haren, P.C.; Wijnoltz, F.

    1992-04-01

    The Rijnhuizen Tokamak Project RTP is a medium-sized tokamak experiment, which requires a very reliable data-acquisition system, due to its pulsed nature. Analyzing the limitations of an existing CAMAC-based data-acquisition system showed, that substantial increase of performance and flexibility could best be obtained by the construction of an entirely new system. This paper discusses this system, CALLED TRAMP (Transient Recorder and Amoeba Multi Processor), based on tailor-made transient recorders with a multiprocessor computer system in VME running Amoeba. The performance of TRAMP exceeds the performance of the CAMAC system by a factor of four. The plans to increase the flexibilitymore » and for a further increase of performance are presented.« less

  16. Feasibility Study of Commercial Markets for New Sample Acquisition Devices

    NASA Technical Reports Server (NTRS)

    Brady, Collin; Coyne, Jim; Bilen, Sven G.; Kisenwether, Liz; Miller, Garry; Mueller, Robert P.; Zacny, Kris

    2010-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) and Penn State technology commercialization project was designed to assist in the maturation of a NASA SBIR Phase III technology. The project was funded by NASA's ESMD Education group with oversight from the Surface Systems Office at NASA Kennedy Space Center in the Engineering Directorate. Two Penn State engineering student interns managed the project with support from Honeybee Robotics and NASA Kennedy Space Center. The objective was to find an opportunity to integrate SBIR-developed Regolith Extractor and Sampling Technology as the payload for the future Lunar Lander or Rover missions. The team was able to identify two potential Google Lunar X Prize organizations with considerable interest in utilizing regolith acquisition and transfer technology.

  17. COED Transactions, Vol. XI, No. 2, February 1979. A Student Designed Microcomputer Based Data Acquisition System.

    ERIC Educational Resources Information Center

    Mitchell, Eugene E., Ed.

    In context of an instrumentation course, four ocean engineering students set out to design and construct a micro-computer based data acquisition system that would be compatible with the University's CYBER host computer. The project included hardware design in the area of sampling, analog-to-digital conversion and timing coordination. It also…

  18. Use of software engineering techniques in the design of the ALEPH data acquisition system

    NASA Astrophysics Data System (ADS)

    Charity, T.; McClatchey, R.; Harvey, J.

    1987-08-01

    The SASD methodology is being used to provide a rigorous design framework for various components of the ALEPH data acquisition system. The Entity-Relationship data model is used to describe the layout and configuration of the control and acquisition systems and detector components. State Transition Diagrams are used to specify control applications such as run control and resource management and Data Flow Diagrams assist in decomposing software tasks and defining interfaces between processes. These techniques encourage rigorous software design leading to enhanced functionality and reliability. Improved documentation and communication ensures continuity over the system life-cycle and simplifies project management.

  19. The electronics, trigger and data acquisition system for the liquid argon time projection chamber of the DarkSide-50 search for dark matter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agnes, P.; Albuquerque, I. F. M.; Alexander, T.

    The DarkSide-50 experiment at the Laboratori Nazionali del Gran Sasso is a search for dark matter using a dual phase time projection chamber with 50 kg of low radioactivity argon as target. Light signals from interactions in the argon are detected by a system of 38 photo-multiplier tubes (PMTs), 19 above and 19 below the TPC volume inside the argon cryostat. We describe the electronics which processes the signals from the photo-multipliers, the trigger system which identifies events of interest, and the data-acquisition system which records the data for further analysis. The electronics include resistive voltage dividers on the PMTs,more » custom pre-amplifiers mounted directly on the PMT voltage dividers in the liquid argon, and custom amplifier/discriminators (at room temperature). After amplification, the PMT signals are digitized in CAEN waveform digitizers, and CAEN logic modules are used to construct the trigger, the data acquisition system for the TPC is based on the Fermilab "artdaq" software. The system has been in operation since early 2014.« less

  20. The electronics, trigger and data acquisition system for the liquid argon time projection chamber of the DarkSide-50 search for dark matter

    NASA Astrophysics Data System (ADS)

    Agnes, P.; Albuquerque, I. F. M.; Alexander, T.; Alton, A. K.; Arisaka, K.; Asner, D. M.; Ave, M.; Back, H. O.; Baldin, B.; Biery, K.; Bocci, V.; Bonfini, G.; Bonivento, W.; Bossa, M.; Bottino, B.; Brigatti, A.; Brodsky, J.; Budano, F.; Bussino, S.; Cadeddu, M.; Cadoni, M.; Calaprice, F.; Canci, N.; Candela, A.; Cao, H.; Caravati, M.; Cariello, M.; Carlini, M.; Catalanotti, S.; Cataudella, V.; Cavalcante, P.; Chepurnov, A.; Cicaló, C.; Cocco, A. G.; Covone, G.; Crippa, L.; D'Angelo, D.; D'Incecco, M.; Davini, S.; de Candia, A.; De Cecco, S.; De Deo, M.; De Filippis, G.; De Rosa, G.; De Vincenzi, M.; Derbin, A.; Devoto, A.; Di Eusanio, F.; Dionisi, C.; Di Pietro, G.; Edkins, E.; Empl, A.; Fan, A.; Fiorillo, G.; Fomenko, K.; Forster, G.; Franco, D.; Gabriele, F.; Galbiati, C.; Giagu, S.; Giganti, C.; Giovanetti, G. K.; Goretti, A. M.; Granato, F.; Grandi, L.; Gromov, M.; Guan, M.; Guardincerri, Y.; Hackett, B. R.; Herner, K. R.; Hughes, D.; Humble, P.; Hungerford, E. V.; Ianni, A.; Ianni, A.; James, I.; Johnson, T. N.; Keeter, K.; Kendziora, C. L.; Kobychev, V.; Koh, G.; Korablev, D.; Korga, G.; Kubankin, A.; Li, X.; Lissia, M.; Loer, B.; Lombardi, P.; Longo, G.; Luitz, S.; Ma, Y.; Machado, A.; Machulin, I. N.; Mandarano, A.; Mari, S. M.; Maricic, J.; Marini, L.; Martoff, C. J.; Meyers, P. D.; Miletic, T.; Milincic, R.; Montanari, D.; Monte, A.; Montuschi, M.; Monzani, M. E.; Mosteiro, P.; Mount, B. J.; Muratova, V. N.; Musico, P.; Navrer Agasson, A.; Nelson, A.; Odrowski, S.; Oleinik, A.; Orsini, M.; Ortica, F.; Pagani, L.; Pallavicini, M.; Pantic, E.; Parmeggiano, S.; Pelczar, K.; Pelliccia, N.; Pocar, A.; Pordes, S.; Pugachev, D. A.; Qian, H.; Randle, K.; Ranucci, G.; Razeti, M.; Razeto, A.; Reinhold, B.; Renshaw, A. L.; Rescigno, M.; Riffard, Q.; Romani, A.; Rossi, B.; Rossi, N.; Rountree, S. D.; Sablone, D.; Saggese, P.; Saldanha, R.; Sands, W.; Sangiorgio, S.; Savarese, C.; Schlitzer, B.; Segreto, E.; Semenov, D. A.; Shields, E.; Singh, P. N.; Skorokhvatov, M. D.; Smirnov, O.; Sotnikov, A.; Stanford, C.; Suvorov, Y.; Tartaglia, R.; Tatarowicz, J.; Testera, G.; Tonazzo, A.; Trinchese, P.; Unzhakov, E. V.; Verducci, M.; Vishneva, A.; Vogelaar, R. B.; Wada, M.; Walker, S.; Wang, H.; Wang, Y.; Watson, A. W.; Westerdale, S.; Wojcik, M. M.; Xiang, X.; Xiao, X.; Xu, J.; Yang, C.; Yoo, J.; Zavatarelli, S.; Zec, A.; Zhong, W.; Zhu, C.; Zuzel, G.

    2017-12-01

    The DarkSide-50 experiment at the Laboratori Nazionali del Gran Sasso is a search for dark matter using a dual phase time projection chamber with 50 kg of low radioactivity argon as target. Light signals from interactions in the argon are detected by a system of 38 photo-multiplier tubes (PMTs), 19 above and 19 below the TPC volume inside the argon cryostat. We describe the electronics which processes the signals from the photo-multipliers, the trigger system which identifies events of interest, and the data-acquisition system which records the data for further analysis. The electronics include resistive voltage dividers on the PMTs, custom pre-amplifiers mounted directly on the PMT voltage dividers in the liquid argon, and custom amplifier/discriminators (at room temperature). After amplification, the PMT signals are digitized in CAEN waveform digitizers, and CAEN logic modules are used to construct the trigger; the data acquisition system for the TPC is based on the Fermilab artdaq software. The system has been in operation since early 2014.

  1. The electronics, trigger and data acquisition system for the liquid argon time projection chamber of the DarkSide-50 search for dark matter

    DOE PAGES

    Agnes, P.; Albuquerque, I. F. M.; Alexander, T.; ...

    2017-12-01

    The DarkSide-50 experiment at the Laboratori Nazionali del Gran Sasso is a search for dark matter using a dual phase time projection chamber with 50 kg of low radioactivity argon as target. Light signals from interactions in the argon are detected by a system of 38 photo-multiplier tubes (PMTs), 19 above and 19 below the TPC volume inside the argon cryostat. We describe the electronics which processes the signals from the photo-multipliers, the trigger system which identifies events of interest, and the data-acquisition system which records the data for further analysis. The electronics include resistive voltage dividers on the PMTs,more » custom pre-amplifiers mounted directly on the PMT voltage dividers in the liquid argon, and custom amplifier/discriminators (at room temperature). After amplification, the PMT signals are digitized in CAEN waveform digitizers, and CAEN logic modules are used to construct the trigger, the data acquisition system for the TPC is based on the Fermilab "artdaq" software. The system has been in operation since early 2014.« less

  2. Projects in an expert system class

    NASA Technical Reports Server (NTRS)

    Whitson, George M.

    1991-01-01

    Many universities now teach courses in expert systems. In these courses students study the architecture of an expert system, knowledge acquisition techniques, methods of implementing systems and verification and validation techniques. A major component of any such course is a class project consisting of the design and implementation of an expert system. Discussed here are a number of techniques that we have used at the University of Texas at Tyler to develop meaningful projects that could be completed in a semester course.

  3. Registration of 3D and Multispectral Data for the Study of Cultural Heritage Surfaces

    PubMed Central

    Chane, Camille Simon; Schütze, Rainer; Boochs, Frank; Marzani, Franck S.

    2013-01-01

    We present a technique for the multi-sensor registration of featureless datasets based on the photogrammetric tracking of the acquisition systems in use. This method is developed for the in situ study of cultural heritage objects and is tested by digitizing a small canvas successively with a 3D digitization system and a multispectral camera while simultaneously tracking the acquisition systems with four cameras and using a cubic target frame with a side length of 500 mm. The achieved tracking accuracy is better than 0.03 mm spatially and 0.150 mrad angularly. This allows us to seamlessly register the 3D acquisitions and to project the multispectral acquisitions on the 3D model. PMID:23322103

  4. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  5. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  6. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  7. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  8. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  9. Extending DART to meet the data acquisition needs of future experiments at Fermilab

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oleynik, G.; Pordes, R.; Barsotti, E.

    1995-10-01

    The DART project at Fermilab is a major collaboration to develop a data acquisition system for multiple experiments. The initial implementation of DART has concentrated on providing working data acquisition systems for the (now eight) collaborating experiments in the next Fixed Target Run. In this paper we discuss aspects of the architecture of DART and how these will allow it to be extended to meet the expected needs of future experiments at Fermilab. We also discuss some ongoing developments within the Fermilab Computing Division towards these new implementations.

  10. Machine translation project alternatives analysis

    NASA Technical Reports Server (NTRS)

    Bajis, Catherine J.; Bedford, Denise A. D.

    1993-01-01

    The Machine Translation Project consists of several components, two of which, the Project Plan and the Requirements Analysis, have already been delivered. The Project Plan details the overall rationale, objectives and time-table for the project as a whole. The Requirements Analysis compares a number of available machine translation systems, their capabilities, possible configurations, and costs. The Alternatives Analysis has resulted in a number of conclusions and recommendations to the NASA STI program concerning the acquisition of specific MT systems and related hardware and software.

  11. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2011-04-14

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of Congress...disaggregation of the Deepwater Acquisition into asset-based Acquisition Program Baselines, the proposed changes align projects that were formerly grouped...industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ

  12. ORAC: a modern observing system for UKIRT

    NASA Astrophysics Data System (ADS)

    Bridger, Alan; Wright, Gillian S.; Economou, Frossie; Tan, Min; Currie, Malcolm J.; Pickup, David A.; Adamson, Andrew J.; Rees, Nicholas P.; Purves, Maren; Kackley, Russell

    2000-06-01

    The steady improvement in telescope performance at UKIRT and the increase in data acquisition rates led to a strong desired for an integrated observing framework that would meet the needs of future instrumentation, as well as providing some support for existing instrumentation. Thus the Observatory Reduction and Acquisition Control (ORAC) project was created in 1997 with the goals of improving the scientific productivity in the telescope, reducing the overall ongoing support requirements, and eventually supporting the use of more flexibly scheduled observing. The project was also expected to achieve this within a tight resource allocation. In October 1999 the ORAC system was commissioned at the United Kingdom Infrared Telescope.

  13. High frequency signal acquisition and control system based on DSP+FPGA

    NASA Astrophysics Data System (ADS)

    Liu, Xiao-qi; Zhang, Da-zhi; Yin, Ya-dong

    2017-10-01

    This paper introduces a design and implementation of high frequency signal acquisition and control system based on DSP + FPGA. The system supports internal/external clock and internal/external trigger sampling. It has a maximum sampling rate of 400MBPS and has a 1.4GHz input bandwidth for the ADC. Data can be collected continuously or periodically in systems and they are stored in DDR2. At the same time, the system also supports real-time acquisition, the collected data after digital frequency conversion and Cascaded Integrator-Comb (CIC) filtering, which then be sent to the CPCI bus through the high-speed DSP, can be assigned to the fiber board for subsequent processing. The system integrates signal acquisition and pre-processing functions, which uses high-speed A/D, high-speed DSP and FPGA mixed technology and has a wide range of uses in data acquisition and recording. In the signal processing, the system can be seamlessly connected to the dedicated processor board. The system has the advantages of multi-selectivity, good scalability and so on, which satisfies the different requirements of different signals in different projects.

  14. A microprogrammed data acquisition system for renography.

    PubMed

    Imperiale, C

    1983-01-01

    The purpose of this project was to design an efficient, low cost, and portable system for renography suitable for clinical use. The principles involved in the renographic test, and the procedures and calculations which act on the design of our system, are given. The system consists of an Apple II Plus computer equipped with 48K memory, two disk drives with diskettes of 143K each, a thermal printer with graphic capability, the Microsoft Z80 card, and an interface which is specifically designed for renographic data acquisition.

  15. Modular optical topometric sensor for 3D acquisition of human body surfaces and long-term monitoring of variations.

    PubMed

    Bischoff, Guido; Böröcz, Zoltan; Proll, Christian; Kleinheinz, Johannes; von Bally, Gert; Dirksen, Dieter

    2007-08-01

    Optical topometric 3D sensors such as laser scanners and fringe projection systems allow detailed digital acquisition of human body surfaces. For many medical applications, however, not only the current shape is important, but also its changes, e.g., in the course of surgical treatment. In such cases, time delays of several months between subsequent measurements frequently occur. A modular 3D coordinate measuring system based on the fringe projection technique is presented that allows 3D coordinate acquisition including calibrated color information, as well as the detection and visualization of deviations between subsequent measurements. In addition, parameters describing the symmetry of body structures are determined. The quantitative results of the analysis may be used as a basis for objective documentation of surgical therapy. The system is designed in a modular way, and thus, depending on the object of investigation, two or three cameras with different capabilities in terms of resolution and color reproduction can be utilized to optimize the set-up.

  16. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1988-01-01

    Deep Space Network and Systems topics addressed include: tracking and ground-base navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; and network upgrading and sustaining.

  17. Data acquisition and readout system for the LUX dark matter experiment

    DOE PAGES

    Akerib, D. S.; Bai, X.; Bedikian, S.; ...

    2011-11-28

    LUX is a two-phase (liquid/gas) xenon time projection chamber designed to detect nuclear recoils from interactions with dark matter particles. Signals from the LUX detector are processed by custom-built analog electronics which provide properly shaped signals for the trigger and data acquisition (DAQ) systems. The DAQ is comprised of commercial digitizers with firmware customized for the LUX experiment. Data acquisition systems in rare-event searches must accommodate high rate and large dynamic range during precision calibrations involving radioactive sources, while also delivering low threshold for maximum sensitivity. The LUX DAQ meets these challenges using real-time baseline sup- pression that allows formore » a maximum event acquisition rate in excess of 1.5 kHz with virtually no deadtime. This work describes the LUX DAQ and the novel acquisition techniques employed in the LUX experiment.« less

  18. Project report : Alaska travel information system

    DOT National Transportation Integrated Search

    2004-11-01

    The Alaska Department of Transportation and Public Facilities (ADOT&PF) initiated the Alaska Travel Information System by joining the Condition Acquisition and Reporting System/511 (CARS/511) Pooled Fund in October 2002. CARS was jointly developed by...

  19. The Combined Enterprise Regional Information Exchange System -- The Way Ahead

    DTIC Science & Technology

    2007-09-01

    the more complex, difficult functions have been centralized to areas under less stress that are staffed with support personnel with a higher level of...ABBREVIATIONS AND ACRONYMS AAP Accelerated Acquisition Plan ACAT Acquisition Category ADNS Automated Digital Network System ALT Actual Learning...a half, while we worked on this project was invaluable. We would especially like to thank LtCol Karl Pfeiffer and Mr. Buddy Barreto for their

  20. Space Science

    NASA Image and Video Library

    1995-06-08

    Scientists at Marshall's Adaptive Optics Lab demonstrate the Wave Front Sensor alignment using the Phased Array Mirror Extendible Large Aperture (PAMELA) optics adjustment. The primary objective of the PAMELA project is to develop methods for aligning and controlling adaptive optics segmented mirror systems. These systems can be used to acquire or project light energy. The Next Generation Space Telescope is an example of an energy acquisition system that will employ segmented mirrors. Light projection systems can also be used for power beaming and orbital debris removal. All segmented optical systems must be adjusted to provide maximum performance. PAMELA is an on going project that NASA is utilizing to investigate various methods for maximizing system performance.

  1. Evolution Of The Operational Energy Strategy And Its Consideration In The Defense Acquisition Process

    DTIC Science & Technology

    2016-09-01

    OPERATIONAL ENERGY STRATEGY AND ITS CONSIDERATION IN THE DEFENSE ACQUISITION PROCESS by Richard J. Kendig Ashley D. Seaton Robert J. Rodgers...project 4. TITLE AND SUBTITLE EVOLUTION OF THE OPERATIONAL ENERGY STRATEGY AND ITS CONSIDERATION IN THE DEFENSE ACQUISITION PROCESS 5. FUNDING...looked at the DOD Operational Energy Strategy evolution and how it applies to new and modified weapon systems, considering the three-legged table of the

  2. The Laser-Guided Bomb: Case History of a Development

    DTIC Science & Technology

    1974-06-01

    is part of Rand’s R&D and Acquisition Studies Program , supported by tJSAF Project RAND. Previous research done at Rarn has dealt with stu.les of...particular development programs , institutional aspects of Air Force acquisition decisiormaking, and improvements in system acquisition policy wieh respect...Corn- parative Study of Doctrine, Technology, and Organization in the USAF Ballistic and Cruise Missile Programs , 1950-1960, RM-48%3-PR, August 1966

  3. Defense Acquisition Reform: Where Do We Go From Here? A Compendium of Views by Leading Experts

    DTIC Science & Technology

    2014-10-02

    and government-owned production come close to matching the power of the Free Enterprise System broadly embraced by the U.S., including when providing...The defense acquisition process—along with most of our nation’s challenges, such as the provision of energy , building an economy, providing...Acquisition, Technology & Logistics. The projects have covered a wide variety of topics including, directed energy , unmanned vehicle, reviews of

  4. Structuration and acquisition of medical knowledge. Using UMLS in the conceptual graph formalism.

    PubMed Central

    Volot, F.; Zweigenbaum, P.; Bachimont, B.; Ben Said, M.; Bouaud, J.; Fieschi, M.; Boisvieux, J. F.

    1993-01-01

    The use of a taxonomy, such as the concept type lattice (CTL) of Conceptual Graphs, is a central structuring piece in a knowledge-based system. The knowledge it contains is constantly used by the system, and its structure provides a guide for the acquisition of other pieces of knowledge. We show how UMLS can be used as a knowledge resource to build a CTL and how the CTL can help the process of acquisition for other kinds of knowledge. We illustrate this method in the context of the MENELAS natural language understanding project. PMID:8130568

  5. Development of a Unix/VME data acquisition system

    NASA Astrophysics Data System (ADS)

    Miller, M. C.; Ahern, S.; Clark, S. M.

    1992-01-01

    The current status of a Unix-based VME data acquisition development project is described. It is planned to use existing Fortran data collection software to drive the existing CAMAC electronics via a VME CAMAC branch driver card and associated Daresbury Unix driving software. The first usable Unix driver has been written and produces single-action CAMAC cycles from test software. The data acquisition code has been implemented in test mode under Unix with few problems and effort is now being directed toward finalizing calls to the CAMAC-driving software and ultimate evaluation of the complete system.

  6. Design and Development of a New Multi-Projection X-Ray System for Chest Imaging

    NASA Astrophysics Data System (ADS)

    Chawla, Amarpreet S.; Boyce, Sarah; Washington, Lacey; McAdams, H. Page; Samei, Ehsan

    2009-02-01

    Overlapping anatomical structures may confound the detection of abnormal pathology, including lung nodules, in conventional single-projection chest radiography. To minimize this fundamental limiting factor, a dedicated digital multi-projection system for chest imaging was recently developed at the Radiology Department of Duke University. We are reporting the design of the multi-projection imaging system and its initial performance in an ongoing clinical trial. The system is capable of acquiring multiple full-field projections of the same patient along both the horizontal and vertical axes at variable speeds and acquisition frame rates. These images acquired in rapid succession from slightly different angles about the posterior-anterior (PA) orientation can be correlated to minimize the influence of overlying anatomy. The developed system has been tested for repeatability and motion blur artifacts to investigate its robustness for clinical trials. Excellent geometrical consistency was found in the tube motion, with positional errors for clinical settings within 1%. The effect of tube-motion on the image quality measured in terms of impact on the modulation transfer function (MTF) was found to be minimal. The system was deemed clinic-ready and a clinical trial was subsequently launched. The flexibility of image acquisition built into the system provides a unique opportunity to easily modify it for different clinical applications, including tomosynthesis, correlation imaging (CI), and stereoscopic imaging.

  7. Bibliographic Automation of Large Library Operations Using a Time-Sharing System: Phase I. Final Report.

    ERIC Educational Resources Information Center

    Epstein, A. H.; And Others

    The first phase of an ongoing library automation project at Stanford University is described. Project BALLOTS (Bibliographic Automation of Large Library Operations Using a Time-Sharing System) seeks to automate the acquisition and cataloging functions of a large library using an on-line time-sharing computer. The main objectives are to control…

  8. Report: Acquisition Certifications Needed for Managers Overseeing Development of EPA’s Electronic Manifest System

    EPA Pesticide Factsheets

    Report #17-P-0029, November 7, 2016. Ineffective project oversight could cause project delays that prolong the EPA's ability to provide emergency responders with data about hazardous waste shipped between generators’ sites and waste management facilities.

  9. 48 CFR 917.7000 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 917.7000 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Cost Participation 917.7000 Scope of subpart. (a) This subpart.../or demonstration projects under DOE prime contracts. This subpart does not cover efforts and projects...

  10. Actively triggered 4d cone-beam CT acquisition.

    PubMed

    Fast, Martin F; Wisotzky, Eric; Oelfke, Uwe; Nill, Simeon

    2013-09-01

    4d cone-beam computed tomography (CBCT) scans are usually reconstructed by extracting the motion information from the 2d projections or an external surrogate signal, and binning the individual projections into multiple respiratory phases. In this "after-the-fact" binning approach, however, projections are unevenly distributed over respiratory phases resulting in inefficient utilization of imaging dose. To avoid excess dose in certain respiratory phases, and poor image quality due to a lack of projections in others, the authors have developed a novel 4d CBCT acquisition framework which actively triggers 2d projections based on the forward-predicted position of the tumor. The forward-prediction of the tumor position was independently established using either (i) an electromagnetic (EM) tracking system based on implanted EM-transponders which act as a surrogate for the tumor position, or (ii) an external motion sensor measuring the chest-wall displacement and correlating this external motion to the phase-shifted diaphragm motion derived from the acquired images. In order to avoid EM-induced artifacts in the imaging detector, the authors devised a simple but effective "Faraday" shielding cage. The authors demonstrated the feasibility of their acquisition strategy by scanning an anthropomorphic lung phantom moving on 1d or 2d sinusoidal trajectories. With both tumor position devices, the authors were able to acquire 4d CBCTs free of motion blurring. For scans based on the EM tracking system, reconstruction artifacts stemming from the presence of the EM-array and the EM-transponders were greatly reduced using newly developed correction algorithms. By tuning the imaging frequency independently for each respiratory phase prior to acquisition, it was possible to harmonize the number of projections over respiratory phases. Depending on the breathing period (3.5 or 5 s) and the gantry rotation time (4 or 5 min), between ∼90 and 145 projections were acquired per respiratory phase resulting in a dose of ∼1.7-2.6 mGy per respiratory phase. Further dose savings and decreases in the scanning time are possible by acquiring only a subset of all respiratory phases, for example, peak-exhale and peak-inhale only scans. This study is the first experimental demonstration of a new 4d CBCT acquisition paradigm in which imaging dose is efficiently utilized by actively triggering only those projections that are desired for the reconstruction process.

  11. Single shot laser speckle based 3D acquisition system for medical applications

    NASA Astrophysics Data System (ADS)

    Khan, Danish; Shirazi, Muhammad Ayaz; Kim, Min Young

    2018-06-01

    The state of the art techniques used by medical practitioners to extract the three-dimensional (3D) geometry of different body parts requires a series of images/frames such as laser line profiling or structured light scanning. Movement of the patients during scanning process often leads to inaccurate measurements due to sequential image acquisition. Single shot structured techniques are robust to motion but the prevalent challenges in single shot structured light methods are the low density and algorithm complexity. In this research, a single shot 3D measurement system is presented that extracts the 3D point cloud of human skin by projecting a laser speckle pattern using a single pair of images captured by two synchronized cameras. In contrast to conventional laser speckle 3D measurement systems that realize stereo correspondence by digital correlation of projected speckle patterns, the proposed system employs KLT tracking method to locate the corresponding points. The 3D point cloud contains no outliers and sufficient quality of 3D reconstruction is achieved. The 3D shape acquisition of human body parts validates the potential application of the proposed system in the medical industry.

  12. Demonstration of a fully differential VGA chip with small THD for ECG acquisition system

    NASA Astrophysics Data System (ADS)

    Gongli, Xiao; Yuliang, Qin; Weilin, Xu; Baolin, Wei; Jihai, Duan; Xueming, Wei

    2015-10-01

    We present both a theoretical and experimental demonstration of a fully differential variable gain amplifier (VGA) with small total harmonic distortion (THD) for an electrocardiogram (ECG) acquisition system. Capacitive feedback technology is adopted to reduce the nonlinearity of VGA. The fully differential VGA has been fabricated in SMIC 0.18-μm CMOS process, and it only occupies 0.11 mm2. The measurements are in good agreement with simulation results. Experimental results show that the gain of VGA changes from 6.17 to 43.75 dB with a gain step of 3 dB. The high-pass corner frequency and low-pass corner frequency are around 0.22 Hz and 7.9 kHz, respectively. For each gain configuration, a maximal THD of 0.13% is obtained. The fully differential VGA has a low THD and its key performance parameters are well satisfied with the demands of ECG acquisition system application in the UWB wireless body area network. Project supported by the National Natural Science Foundation of China (Nos. 61264001, 61465004, 61161003, 61166004), the Guangxi Natural Science Foundation (Nos. 2013GXNSFAA019333, 2013GXNSFAA019338), the Science and Technology Research Key Project of Guangxi Department of Education (No. 2013ZD026), and the Innovation Project of GUET Graduate Education (No. GDYCSZ201457).

  13. Cryogenic Technology Development for Exploration Missions

    NASA Technical Reports Server (NTRS)

    Chato, David J.

    2007-01-01

    This paper reports the status and findings of different cryogenic technology research projects in support of the President s Vision for Space Exploration. The exploration systems architecture study is reviewed for cryogenic fluid management needs. It is shown that the exploration architecture is reliant on the cryogenic propellants of liquid hydrogen, liquid oxygen and liquid methane. Needs identified include: the key technologies of liquid acquisition devices, passive thermal and pressure control, low gravity mass gauging, prototype pressure vessel demonstration, active thermal control; as well as feed system testing, and Cryogenic Fluid Management integrated system demonstration. Then five NASA technology projects are reviewed to show how these needs are being addressed by technology research. Projects reviewed include: In-Space Cryogenic Propellant Depot; Experimentation for the Maturation of Deep Space Cryogenic Refueling Technology; Cryogenic Propellant Operations Demonstrator; Zero Boil-Off Technology Experiment; and Propulsion and Cryogenic Advanced Development. Advances are found in the areas of liquid acquisition of liquid oxygen, mass gauging of liquid oxygen via radio frequency techniques, computational modeling of thermal and pressure control, broad area cooling thermal control strategies, flight experiments for resolving low gravity issues of cryogenic fluid management. Promising results are also seen for Joule-Thomson pressure control devices in liquid oxygen and liquid methane and liquid acquisition of methane, although these findings are still preliminary.

  14. Phased Array Mirror Extendible Large Aperture (PAMELA) Optics Adjustment

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Scientists at Marshall's Adaptive Optics Lab demonstrate the Wave Front Sensor alignment using the Phased Array Mirror Extendible Large Aperture (PAMELA) optics adjustment. The primary objective of the PAMELA project is to develop methods for aligning and controlling adaptive optics segmented mirror systems. These systems can be used to acquire or project light energy. The Next Generation Space Telescope is an example of an energy acquisition system that will employ segmented mirrors. Light projection systems can also be used for power beaming and orbital debris removal. All segmented optical systems must be adjusted to provide maximum performance. PAMELA is an on going project that NASA is utilizing to investigate various methods for maximizing system performance.

  15. 48 CFR 306.303-2 - Content.

    Code of Federal Regulations, 2013 CFR

    1996-10-01

    ... 48 Federal Acquisition Regulations System 4 1996-10-01 1996-10-01 false Content. 306.303-2 Section 306.303-2 ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-2 Content. (a)(1) The program office and name, address, and telephone number of the project officer shall also be included. (2) This item shall...

  16. 48 CFR 306.303-2 - Content.

    Code of Federal Regulations, 2013 CFR

    1998-10-01

    ... 48 Federal Acquisition Regulations System 4 1998-10-01 1998-10-01 false Content. 306.303-2 Section 306.303-2 ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 306.303-2 Content. (a)(1) The program office and name, address, and telephone number of the project officer shall also be included. (2) This item shall...

  17. Recent Developments at the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2011-01-01

    Several upgrade projects have been completed or are just getting started at the NASA Langley Research Center National Transonic Facility. These projects include a new high capacity semi-span balance, model dynamics damping system, semi-span model check load stand, data acquisition system upgrade, facility automation system upgrade and a facility reliability assessment. This presentation will give a brief synopsis of each of these efforts.

  18. Connected commercial vehicles-integrated truck project : data acquisition system (DAS) documentation.

    DOT National Transportation Integrated Search

    1996-08-01

    The report documents work performed under the FTA Advanced Public Transportation Systems (APTS) Program, a program structured to undertake research and development of innovative applications of advanced navigation, information, and communication tech...

  19. Feasibility of developing a portable driver performance data acquisition system for human factors research: Technical tasks. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, R.J.; Barickman, F.S.; Spelt, P.F.

    1998-01-01

    A two-phase, multi-year research program entitled ``development of a portable driver performance data acquisition system for human factors research`` was recently completed. The primary objective of the project was to develop a portable data acquisition system for crash avoidance research (DASCAR) that will allow drive performance data to be collected using a large variety of vehicle types and that would be capable of being installed on a given vehicle type within a relatively short-time frame. During phase 1 a feasibility study for designing and fabricating DASCAR was conducted. In phase 2 of the research DASCAR was actually developed and validated.more » This technical memorandum documents the results from the feasibility study. It is subdivided into three volumes. Volume one (this report) addresses the last five items in the phase 1 research and the first issue in the second phase of the project. Volumes two and three present the related appendices, and the design specifications developed for DASCAR respectively. The six tasks were oriented toward: identifying parameters and measures; identifying analysis tools and methods; identifying measurement techniques and state-of-the-art hardware and software; developing design requirements and specifications; determining the cost of one or more copies of the proposed data acquisition system; and designing a development plan and constructing DASCAR. This report also covers: the background to the program; the requirements for the project; micro camera testing; heat load calculations for the DASCAR instrumentation package in automobile trunks; phase 2 of the research; the DASCAR hardware and software delivered to the National Highway Traffic Safety Administration; and crash avoidance problems that can be addressed by DASCAR.« less

  20. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1984-01-01

    Tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for new projects; networks consolidation program; and network sustaining are described.

  1. The Defense Acquisitions System Through the Eyes of a Marine Corps Project Officer: Observations, Inefficiencies, and Proposed Solutions

    DTIC Science & Technology

    2013-04-03

    adequate return on investments . As part of a results-oriented culture, acquisitions leaders must identify and hold accountable those employees who are...accountability and leadership is at the heart of acquisitions inefficiency. Employees that lack a sense of urgency and that are not fully invested in...inefficiency. Employees that lack a sense of urgency and that are not fully invested in delivering a quality product to the user, in a timely manner, are

  2. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  3. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  4. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  5. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  6. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  7. Data acquisition for a real time fault monitoring and diagnosis knowledge-based system for space power system

    NASA Technical Reports Server (NTRS)

    Wilhite, Larry D.; Lee, S. C.; Lollar, Louis F.

    1989-01-01

    The design and implementation of the real-time data acquisition and processing system employed in the AMPERES project is described, including effective data structures for efficient storage and flexible manipulation of the data by the knowledge-based system (KBS), the interprocess communication mechanism required between the data acquisition system and the KBS, and the appropriate data acquisition protocols for collecting data from the sensors. Sensor data are categorized as critical or noncritical data on the basis of the inherent frequencies of the signals and the diagnostic requirements reflected in their values. The critical data set contains 30 analog values and 42 digital values and is collected every 10 ms. The noncritical data set contains 240 analog values and is collected every second. The collected critical and noncritical data are stored in separate circular buffers. Buffers are created in shared memory to enable other processes, i.e., the fault monitoring and diagnosis process and the user interface process, to freely access the data sets.

  8. Knowledge acquisition and rapid protyping of an expert system: Dealing with real world problems

    NASA Technical Reports Server (NTRS)

    Bailey, Patrick A.; Doehr, Brett B.

    1988-01-01

    The knowledge engineering and rapid prototyping phases of an expert system that does fault handling for a Solid Amine, Water Desorbed CO2 removal assembly for the Environmental Control and Life Support System for space based platforms are addressed. The knowledge acquisition phase for this project was interesting because it could not follow the textbook examples. As a result of this, a variety of methods were used during the knowledge acquisition task. The use of rapid prototyping and the need for a flexible prototype suggested certain types of knowledge representation. By combining various techniques, a representative subset of faults and a method for handling those faults was achieved. The experiences should prove useful for developing future fault handling expert systems under similar constraints.

  9. Breathing motion compensated reconstruction for C-arm cone beam CT imaging: initial experience based on animal data

    NASA Astrophysics Data System (ADS)

    Schäfer, D.; Lin, M.; Rao, P. P.; Loffroy, R.; Liapi, E.; Noordhoek, N.; Eshuis, P.; Radaelli, A.; Grass, M.; Geschwind, J.-F. H.

    2012-03-01

    C-arm based tomographic 3D imaging is applied in an increasing number of minimal invasive procedures. Due to the limited acquisition speed for a complete projection data set required for tomographic reconstruction, breathing motion is a potential source of artifacts. This is the case for patients who cannot comply breathing commands (e.g. due to anesthesia). Intra-scan motion estimation and compensation is required. Here, a scheme for projection based local breathing motion estimation is combined with an anatomy adapted interpolation strategy and subsequent motion compensated filtered back projection. The breathing motion vector is measured as a displacement vector on the projections of a tomographic short scan acquisition using the diaphragm as a landmark. Scaling of the displacement to the acquisition iso-center and anatomy adapted volumetric motion vector field interpolation delivers a 3D motion vector per voxel. Motion compensated filtered back projection incorporates this motion vector field in the image reconstruction process. This approach is applied in animal experiments on a flat panel C-arm system delivering improved image quality (lower artifact levels, improved tumor delineation) in 3D liver tumor imaging.

  10. Photoacoustic Imaging of Animals with an Annular Transducer Array

    NASA Astrophysics Data System (ADS)

    Yang, Di-Wu; Zhou, Zhi-Bin; Zeng, Lv-Ming; Zhou, Xin; Chen, Xing-Hui

    2014-07-01

    A photoacoustic system with an annular transducer array is presented for rapid, high-resolution photoacoustic tomography of animals. An eight-channel data acquisition system is applied to capture the photoacoustic signals by using multiplexing and the total time of data acquisition and transferring is within 3 s. A limited-view filtered back projection algorithm is used to reconstruct the photoacoustic images. Experiments are performed on a mouse head and a rabbit head and clear photoacoustic images are obtained. The experimental results demonstrate that this imaging system holds the potential for imaging the human brain.

  11. Engineering Data Compendium. Human Perception and Performance, Volume 1

    NASA Technical Reports Server (NTRS)

    Boff, Kenneth R. (Editor); Lincoln, Janet E. (Editor)

    1988-01-01

    The concept underlying the Engineering Data Compendium was the product an R and D program (Integrated Perceptual Information for Designers project) aimed at facilitating the application of basic research findings in human performance to the design of military crew systems. The principal objective was to develop a workable strategy for: (1) identifying and distilling information of potential value to system design from existing research literature, and (2) presenting this technical information in a way that would aid its accessibility, interpretability, and applicability by system designers. The present four volumes of the Engineering Data Compendium represent the first implementation of this strategy. This is Volume 1, which contains sections on Visual Acquisition of Information, Auditory Acquisition of Information, and Acquisition of Information by Other Senses.

  12. Smart Water: Energy-Water Optimization in Drinking Water Systems

    EPA Science Inventory

    This project aims to develop and commercialize a Smart Water Platform – Sensor-based Data-driven Energy-Water Optimization technology in drinking water systems. The key technological advances rely on cross-platform data acquisition and management system, model-based real-time sys...

  13. Library Automation in the Netherlands and Pica.

    ERIC Educational Resources Information Center

    Bossers, Anton; Van Muyen, Martin

    1984-01-01

    Describes the Pica Library Automation Network (originally the Project for Integrated Catalogue Automation), which is based on a centralized bibliographic database. Highlights include the Pica conception of library automation, online shared cataloging system, circulation control system, acquisition system, and online Dutch union catalog with…

  14. Image acquisition in the Pi-of-the-Sky project

    NASA Astrophysics Data System (ADS)

    Jegier, M.; Nawrocki, K.; Poźniak, K.; Sokołowski, M.

    2006-10-01

    Modern astronomical image acquisition systems dedicated for sky surveys provide large amount of data in a single measurement session. During one session that lasts a few hours it is possible to get as much as 100 GB of data. This large amount of data needs to be transferred from camera and processed. This paper presents some aspects of image acquisition in a sky survey image acquisition system. It describes a dedicated USB linux driver for the first version of the "Pi of The Sky" CCD camera (later versions have also Ethernet interface) and the test program for the camera together with a driver-wrapper providing core device functionality. Finally, the paper contains description of an algorithm for matching several images based on image features, i.e. star positions and their brightness.

  15. Overview of NASA Technology Development for In-Situ Resource Utilization (ISRU)

    NASA Technical Reports Server (NTRS)

    Linne, Diane L.; Sanders, Gerald B.; Starr, Stanley O.; Eisenman, David J.; Suzuki, Nantel H.; Anderson, Molly S.; O'Malley, Terrence F.; Araghi, Koorosh R.

    2017-01-01

    In-Situ Resource Utilization (ISRU) encompasses a broad range of systems that enable the production and use of extraterrestrial resources in support of future exploration missions. It has the potential to greatly reduce the dependency on resources transported from Earth (e.g., propellants, life support consumables), thereby significantly improving the ability to conduct future missions. Recognizing the critical importance of ISRU for the future, NASA is currently conducting technology development projects in two of its four mission directorates. The Advanced Exploration Systems Division in the Agency's Human Exploration and Operations Mission Directorate has initiated a new project for ISRU Technology focused on component, subsystem, and system maturation in the areas of water volatiles resource acquisition, and water volatiles and atmospheric processing into propellants and other consumable products. The Space Technology Mission Directorate is supporting development of ISRU component technologies in the areas of Mars atmosphere acquisition, including dust management, and oxygen production from Mars atmosphere for propellant and life support consumables. Together, these two coordinated projects are working towards a common goal of demonstrating ISRU technology and systems in preparation for future flight applications.

  16. Linking Logistics and Operations: A Case Study of World War II Air Power

    DTIC Science & Technology

    1991-01-01

    Weapon System Evaluation Group, 1951, p. 30). The logistic innovation greatly extended the time that combat ships could remain on station and...presented. This Note was produced under the Project AIR FORCE Resource Management and System Acquisition Program in the project "Combat Support C3 Needs...maintenance workload data suggest either unacceptable system performance or excessive costs. The predictive power of these models is so poor as to

  17. A new compact, cost-efficient concept for underwater range-gated imaging: the UTOFIA project

    NASA Astrophysics Data System (ADS)

    Mariani, Patrizio; Quincoces, Iñaki; Galparsoro, Ibon; Bald, Juan; Gabiña, Gorka; Visser, Andy; Jónasdóttir, Sigrun; Haugholt, Karl Henrik; Thorstensen, Jostein; Risholm, Petter; Thielemann, Jens

    2017-04-01

    Underwater Time Of Flight Image Acquisition system (UTOFIA) is a recently launched H2020 project (H2020 - 633098) to develop a compact and cost-effective underwater imaging system especially suited for observations in turbid environments. The UTOFIA project targets technology that can overcome the limitations created by scattering, by introducing cost-efficient range-gated imaging for underwater applications. This technology relies on a image acquisition principle that can extends the imaging range of the cameras 2-3 times respect to other cameras. Moreover, the system will simultaneously capture 3D information of the observed objects. Today range-gated imaging is not widely used, as it relies on specialised optical components making systems large and costly. Recent technology developments have made it possible a significant (2-3 times) reduction in size, complexity and cost of underwater imaging systems, whilst addressing the scattering issues at the same time. By acquiring simultaneous 3D data, the system allows to accurately measure the absolute size of marine life and their spatial relationship to their habitat, enhancing the precision of fish stock monitoring and ecology assessment, hence supporting proper management of marine resources. Additionally, the larger observed volume and the improved image quality make the system suitable for cost-effective underwater surveillance operations in e.g. fish farms, underwater infrastructures. The system can be integrated into existing ocean observatories for real time acquisition and can greatly advance present efforts in developing species recognition algorithms, given the additional features provided, the improved image quality and the independent illumination source based on laser. First applications of the most recent prototype of the imaging system will be provided including inspection of underwater infrastructures and observations of marine life under different environmental conditions.

  18. Design Skills and Prototyping for Defense Systems

    DTIC Science & Technology

    2015-04-30

    however, the utility of prototyping has had a demonstrably mixed record in defense acquisition. Some programs, such as the Manhattan Project , were...almost completely undefined. The first production reactors for the Manhattan Project suffered a near- catastrophic engineering design flaw stemming...architecture, as was seen in the F-117 and Manhattan Project development efforts. Architectural Prototyping Simply maintaining design teams or developing

  19. Test and Evaluation Management Guide

    DTIC Science & Technology

    1988-03-01

    of the acquisition community at large, whose comments, suggestions, and materials were helpful in completing this project . The ...analysis are particularly useful in the early stages of development to provide early projections before system hardware is available. These methods are also...Statement is prescribed by DoD Instruction 5000.2. In summary, it contains the following: o A description of the mission need 0 The projected

  20. Small Unix data acquisition system

    NASA Astrophysics Data System (ADS)

    Engberg, D.; Glanzman, T.

    1994-02-01

    A R&D program has been established to investigate the use of Unix in the various aspects of experimental computation. Earlier R&D work investigated the basic real-time aspects of the IBMRS/6000 workstation running AIX, which claims to be a real-time operating system. The next step in this R&D is the construction of prototype data acquisition system which attempts to exercise many of the features needed in the final on-line system in a realistic situation. For this project, we have combined efforts with a team studying the use of novel cell designs and gas mixtures in a new prototype drift chamber.

  1. SPECT data acquisition and image reconstruction in a stationary small animal SPECT/MRI system

    NASA Astrophysics Data System (ADS)

    Xu, Jingyan; Chen, Si; Yu, Jianhua; Meier, Dirk; Wagenaar, Douglas J.; Patt, Bradley E.; Tsui, Benjamin M. W.

    2010-04-01

    The goal of the study was to investigate data acquisition strategies and image reconstruction methods for a stationary SPECT insert that can operate inside an MRI scanner with a 12 cm bore diameter for simultaneous SPECT/MRI imaging of small animals. The SPECT insert consists of 3 octagonal rings of 8 MR-compatible CZT detectors per ring surrounding a multi-pinhole (MPH) collimator sleeve. Each pinhole is constructed to project the field-of-view (FOV) to one CZT detector. All 24 pinholes are focused to a cylindrical FOV of 25 mm in diameter and 34 mm in length. The data acquisition strategies we evaluated were optional collimator rotations to improve tomographic sampling; and the image reconstruction methods were iterative ML-EM with and without compensation for the geometric response function (GRF) of the MPH collimator. For this purpose, we developed an analytic simulator that calculates the system matrix with the GRF models of the MPH collimator. The simulator was used to generate projection data of a digital rod phantom with pinhole aperture sizes of 1 mm and 2 mm and with different collimator rotation patterns. Iterative ML-EM reconstruction with and without GRF compensation were used to reconstruct the projection data from the central ring of 8 detectors only, and from all 24 detectors. Our results indicated that without GRF compensation and at the default design of 24 projection views, the reconstructed images had significant artifacts. Accurate GRF compensation substantially improved the reconstructed image resolution and reduced image artifacts. With accurate GRF compensation, useful reconstructed images can be obtained using 24 projection views only. This last finding potentially enables dynamic SPECT (and/or MRI) studies in small animals, one of many possible application areas of the SPECT/MRI system. Further research efforts are warranted including experimentally measuring the system matrix for improved geometrical accuracy, incorporating the co-registered MRI image in SPECT reconstruction, and exploring potential applications of the simultaneous SPECT/MRI SA system including dynamic SPECT studies.

  2. Systems and Software Producibility Collaboration and Experimental Environment (SPRUCE)

    DTIC Science & Technology

    2009-04-23

    Research Manhattan Project Like Research – Transition timeframe needed • Current generation programs – DoD acquisitions over next 1-5 years • Next...Specific Computing Plant B a s i c Transformational Research Manhattan Project Like Research B a s i c 16 • Sponsored by Lockheed Martin

  3. Applying Water-Level Difference Control to Central Arizona Project

    USDA-ARS?s Scientific Manuscript database

    The Central Arizona Project (CAP) has been supplying Colorado River water to Central Arizona for roughly 25 years. The CAP canal is operated remotely with a Supervisory Control and Data Acquisition (SCADA) System. Gate position changes are made either manually or through the use of automatic control...

  4. 24 CFR 941.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... maximum project cost, as described in § 941.306: (1) Demolition of, or remediation of environmental... utility systems, and replacement of off-site underground utility systems, extensive rock and/or soil... preparation), administration, site acquisition, relocation, demolition of, and site remediation of...

  5. Geo-referenced digital data acquisition and processing system using LiDAR technology : executive summary.

    DOT National Transportation Integrated Search

    2006-01-01

    This pamphlet gives a brief introduction to the National Intelligent Transportation Systems (ITS) architecture and regional ITS architectures. It gives an overview of architecture, project, and standards requirements, and describes the availability o...

  6. Air Traffic Control: Status of FAA's Standard Terminal Automation Replacement System Project

    DOT National Transportation Integrated Search

    1997-03-01

    Since the early 1980s, FAA's modernization efforts have experienced lengthy : schedule delays and substantial cost overruns. Because of such problems, in : 1994, FAA restructured its acquisition of the Terminal Advanced Automation : System into more ...

  7. First Light with the NRAO Transient Event Capture Hardware

    NASA Astrophysics Data System (ADS)

    Langston, Glen; Rumberg, B.; Brandt, P.

    2007-12-01

    The design, implementation and testing of the first NRAO Event Capture data acquisition system is presented. The NRAO in Green Bank is developing a set of new data acquisition systems based on the U.C. Berkeley CASPER IBOB/ADC/BEE2 hardware. We describe the hardware configuration and initial experiences with the development system. We present first astronomical tests of the Event Capture system, using the 43m telescope (140ft). These observations were carried out at 900 MHz. The observations were made on 2007 July 8 and 9 towards the Crab pulsar, the galactic center, the Moon and two test observations while the 43m was pointed at Zenith (straight up). The Event Capture is one of several on-going FPGA based data acquisition projects being implemented for the Robert C. Byrd Green Bank Telescope (GBT) and for the 43m telescopes. The NRAO Configurable Instrument Collaboration for Agile Data Acquisition (CICADA) program is described at: http://wikio.nrao.edu/bin/view/CICADA

  8. Report on the Total System Computer Program for Medical Libraries.

    ERIC Educational Resources Information Center

    Divett, Robert T.; Jones, W. Wayne

    The objective of this project was to develop an integrated computer program for the total operations of a medical library including acquisitions, cataloging, circulation, reference, a computer catalog, serials controls, and current awareness services. The report describes two systems approaches: the batch system and the terminal system. The batch…

  9. A Complex Systems Perspective of Risk Mitigation and Modeling in Development and Acquisition Programs

    DTIC Science & Technology

    2016-04-30

    also that we have started building in a domain where structural patterns matter, especially for large projects. Complex Systems Complexity has been...through minimalistic thinking and parsimony” and perceived elegance, which “hides systemic or organizational complexity from the user.” If the system

  10. 40 Gbps data acquisition system for NectarCAM

    NASA Astrophysics Data System (ADS)

    Hoffmann, Dirk; Houles, Julien; NectarCAM Team; CTA Consortium, the

    2017-10-01

    The Cherenkov Telescope Array (CTA) will be the next generation ground-based gamma-ray observatory. It will be made up of approximately 100 telescopes of three different sizes, from 4 to 23 meters in diameter. The previously presented prototype of a high speed data acquisition (DAQ) system for CTA (CHEP 2012, [6]) has become concrete within the NectarCAM project, one of the most challenging camera projects with very demanding needs for bandwidth of data handling. We designed a Linux-PC system able to concentrate and process without packet loss the 40 Gb/s average data rate coming from the 265 Front End Boards (FEB) through Gigabit Ethernet links, and to reduce data to fit the two ten-Gigabit Ethernet downstream links by external trigger decisions as well as custom tailored compression algorithms. Within the given constraints, we implemented de-randomisation of the event fragments received as relatively small UDP packets emitted by the FEB, using off-the-shelf equipment as required by the project and for an operation period of at least 30 years. We tested out-of-the-box interfaces and used original techniques to cope with these requirements, and set up a test bench with hundreds of synchronous Gigabit links in order to validate and tune the acquisition chain including downstream data logging based on zeroMQ and Google ProtocolBuffers [8].

  11. Design of area array CCD image acquisition and display system based on FPGA

    NASA Astrophysics Data System (ADS)

    Li, Lei; Zhang, Ning; Li, Tianting; Pan, Yue; Dai, Yuming

    2014-09-01

    With the development of science and technology, CCD(Charge-coupled Device) has been widely applied in various fields and plays an important role in the modern sensing system, therefore researching a real-time image acquisition and display plan based on CCD device has great significance. This paper introduces an image data acquisition and display system of area array CCD based on FPGA. Several key technical challenges and problems of the system have also been analyzed and followed solutions put forward .The FPGA works as the core processing unit in the system that controls the integral time sequence .The ICX285AL area array CCD image sensor produced by SONY Corporation has been used in the system. The FPGA works to complete the driver of the area array CCD, then analog front end (AFE) processes the signal of the CCD image, including amplification, filtering, noise elimination, CDS correlation double sampling, etc. AD9945 produced by ADI Corporation to convert analog signal to digital signal. Developed Camera Link high-speed data transmission circuit, and completed the PC-end software design of the image acquisition, and realized the real-time display of images. The result through practical testing indicates that the system in the image acquisition and control is stable and reliable, and the indicators meet the actual project requirements.

  12. A Practical Project To Help Bilingual Students To Develop Their Knowledge of Science and English Language.

    ERIC Educational Resources Information Center

    Fouzder, Nani B.; Markwick, Andrew J. W.

    1999-01-01

    Describes a class project that included a literature search, observation of the Hale-Bopp comet, planning and building a model solar system, and presentation of the model in class. Finds that bilingual students in the class made significant progress in their learning of concepts and the acquisition of English as a result of completing the project.…

  13. Deficient Contractor Business Systems: Applying the Value at Risk (VAR) Model to Earned Value Management Systems

    DTIC Science & Technology

    2013-06-01

    measuring numerical risk to the government ( Galway , 2004). However, quantitative risk analysis is rarely utilized in DoD acquisition programs because the...quantitative assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost...Kindle version]. Retrieved from Amazon.com 83 Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review

  14. Waste retrieval sluicing system data acquisition system acceptance test report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bevins, R.R.

    1998-07-31

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have tomore » be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.« less

  15. Low-cost telepresence for collaborative virtual environments.

    PubMed

    Rhee, Seon-Min; Ziegler, Remo; Park, Jiyoung; Naef, Martin; Gross, Markus; Kim, Myoung-Hee

    2007-01-01

    We present a novel low-cost method for visual communication and telepresence in a CAVE -like environment, relying on 2D stereo-based video avatars. The system combines a selection of proven efficient algorithms and approximations in a unique way, resulting in a convincing stereoscopic real-time representation of a remote user acquired in a spatially immersive display. The system was designed to extend existing projection systems with acquisition capabilities requiring minimal hardware modifications and cost. The system uses infrared-based image segmentation to enable concurrent acquisition and projection in an immersive environment without a static background. The system consists of two color cameras and two additional b/w cameras used for segmentation in the near-IR spectrum. There is no need for special optics as the mask and color image are merged using image-warping based on a depth estimation. The resulting stereo image stream is compressed, streamed across a network, and displayed as a frame-sequential stereo texture on a billboard in the remote virtual environment.

  16. Medium Spatial Resolution Satellite Characterization

    NASA Technical Reports Server (NTRS)

    Stensaas, Greg

    2007-01-01

    This project provides characterization and calibration of aerial and satellite systems in support of quality acquisition and understanding of remote sensing data, and verifies and validates the associated data products with respect to ground and and atmospheric truth so that accurate value-added science can be performed. The project also provides assessment of new remote sensing technologies.

  17. Motion on Cycloid Paths: A Project

    ERIC Educational Resources Information Center

    Gluck, P.

    2010-01-01

    This article reports a high school laboratory project whose theme is the motion of a small ball on cycloidal tracks. Models were built both of a brachistochrone and of a Huygens pendulum clock whose bob is constrained to move on a cycloidal path. Photogates and a data acquisition system were employed in order to investigate experimentally the…

  18. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...

  19. Systems integrated human engineering on the Navy's rapid acquisition of manufactured parts/test and integration facility

    NASA Technical Reports Server (NTRS)

    Gallaway, Glen R.

    1987-01-01

    Human Engineering in many projects is at best a limited support function. In this Navy project the Human Engineering function is an integral component of the systems design and development process. Human Engineering is a member of the systems design organization. This ensures that people considerations are: (1) identified early in the project; (2) accounted for in the specifications; (3) incorporated into the design; and (4) the tested product meets the needs and expectations of the people while meeting the overall systems requirements. The project exemplifies achievements that can be made by the symbiosis between systems designers, engineers and Human Engineering. This approach increases Human Engineering's effectiveness and value to a project because it becomes an accepted, contributing team member. It is an approach to doing Human Engineering that should be considered for most projects. The functional and organizational issues giving this approach strength are described.

  20. Design and Construction of Detector and Data Acquisition Elements for Proton Computed Tomography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fermi Research Alliance; Northern Illinois University

    2015-07-15

    Proton computed tomography (pCT) offers an alternative to x-ray imaging with potential for three-dimensional imaging, reduced radiation exposure, and in-situ imaging. Northern Illinois University (NIU) is developing a second-generation proton computed tomography system with a goal of demonstrating the feasibility of three-dimensional imaging within clinically realistic imaging times. The second-generation pCT system is comprised of a tracking system, a calorimeter, data acquisition, a computing farm, and software algorithms. The proton beam encounters the upstream tracking detectors, the patient or phantom, the downstream tracking detectors, and a calorimeter. The schematic layout of the PCT system is shown. The data acquisition sendsmore » the proton scattering information to an offline computing farm. Major innovations of the second generation pCT project involve an increased data acquisition rate ( MHz range) and development of three-dimensional imaging algorithms. The Fermilab Particle Physics Division and Northern Illinois Center for Accelerator and Detector Development at Northern Illinois University worked together to design and construct the tracking detectors, calorimeter, readout electronics and detector mounting system.« less

  1. Using Modified Fagan Inspections to Control Rapid System Development

    NASA Technical Reports Server (NTRS)

    Griesel, M. A.; Welz, L. L.

    1994-01-01

    The Jet Propulsion Laboratory (JPL) has been developing new approaches to software and system development to shorten life cycle time and reduce total life-cycle cost, while maintaining product quality. One such approach has been taken by the Just-In-Time (JIT) Materiel Acquisition System Development Project.

  2. Data acquisition and experiment control system of the project Maus (materials science experiments under weightlessness)

    NASA Astrophysics Data System (ADS)

    Lensch, D.

    In the context of Spacelab and Shuttle utilization, it is possible to conduct experiments in 'Small Self Contained Packages' (SSCP). This possibility exists primarily for experiments related to materials research/industrial processing engineering. The program involved is called 'get away special' (GAS). The project Maus was established in West Germany with the aim to participate in the program GAS. The autonomous design of the considered experiments made it necessary to develop an electronic unit for the control and the automatic conduction of the experiment. In addition, the process of the acquisition and the recording of the experimental data is also controlled.

  3. Michigan Department of Transportation statewide advanced traffic management system (ATMS) procurement evaluation - phase I : software procurement.

    DOT National Transportation Integrated Search

    2009-04-01

    This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...

  4. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1987-01-01

    Topics addressed include: tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; network upgrade and sustaining; mission interface and support; and Ka-band capabilities.

  5. Approach Towards an Evidence-Oriented Knowledge and Data Acquisition for the Optimization of Interdisciplinary Care in Dentistry and General Medicine.

    PubMed

    Seitz, Max W; Haux, Christian; Knaup, Petra; Schubert, Ingrid; Listl, Stefan

    2018-01-01

    Associations between dental and chronic-systemic diseases were observed frequently in medical research, however the findings of this research have so far found little relevance in everyday clinical treatment. Major problems are the assessment of evidence for correlations between such diseases and how to integrate current medical knowledge into the intersectoral care of dentists and general practitioners. On the example of dental and chronic-systemic diseases, the Dent@Prevent project develops an interdisciplinary decision support system (DSS), which provides the specialists with information relevant for the treatment of such cases. To provide the physicians with relevant medical knowledge, a mixed-methods approach is developed to acquire the knowledge in an evidence-oriented way. This procedure includes a literature review, routine data analyses, focus groups of dentists and general practitioners as well as the identification and integration of applicable guidelines and Patient Reported Measures (PRMs) into the treatment process. The developed mixed methods approach for an evidence-oriented knowledge acquisition indicates to be applicable and supportable for interdisciplinary projects. It can raise the systematic quality of the knowledge-acquisition process and can be applicable for an evidence-based system development. Further research is necessary to assess the impact on patient care and to evaluate possible applicability in other interdisciplinary areas.

  6. The electronics and data acquisition system for the DarkSide-50 veto detectors

    DOE PAGES

    Agnes, P.; Agostino, L.; Albuquerque, I. F. M.; ...

    2016-12-01

    DarkSide-50 is a detector for dark matter candidates in the form of weakly interacting massive particles (WIMPs). It utilizes a liquid argon time projection chamber (LAr TPC) for the inner main detector. The TPC is surrounded by a liquid scintillator veto (LSV) and a water Cherenkov veto detector (WCV). The LSV and WCV, both instrumented with PMTs, act as the neutron and cosmogenic muon veto detectors for DarkSide-50. This paper describes the electronics and data acquisition system used for these two detectors.

  7. The Geysers pipeline project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.; Allen, E.

    A unique public/private partnership of local, state, federal and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quotes} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of the The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function and environmental impacts, its implementation hasmore » required: (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation and financing of the project, and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.« less

  8. Turning community wastes into sustainable geothermal energy: The S.E. Geysers effluent pipeline project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.; Allen, E.

    A unique public/private partnership of local, state, federal, and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quote} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function, and environmental impacts, its implementation has required:more » (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation, and financing of the project; and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.« less

  9. Medial Auditory Thalamus Is Necessary for Acquisition and Retention of Eyeblink Conditioning to Cochlear Nucleus Stimulation

    ERIC Educational Resources Information Center

    Halverson, Hunter E.; Poremba, Amy; Freeman, John H.

    2015-01-01

    Associative learning tasks commonly involve an auditory stimulus, which must be projected through the auditory system to the sites of memory induction for learning to occur. The cochlear nucleus (CN) projection to the pontine nuclei has been posited as the necessary auditory pathway for cerebellar learning, including eyeblink conditioning.…

  10. A small Unix-based data acquisition system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engberg, D.; Glanzman, T.

    1994-02-01

    The proposed SLAC B Factory detector plans to use Unix-based machines for all aspects of computing, including real-time data acquisition and experimental control. A R and D program has been established to investigate the use of Unix in the various aspects of experimental computation. Earlier R and D work investigated the basic real-time aspects of the IBM RS/6000 workstation running AIX, which claims to be a real-time operating system. The next step in this R and D is the construction of a prototype data acquisition system which attempts to exercise many of the features needed in the final on-line systemmore » in a realistic situation. For this project, the authors have combined efforts with a team studying the use of novel cell designs and gas mixtures in a new prototype drift chamber.« less

  11. 76 FR 7526 - Major System Acquisition; Earned Value Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-10

    ... for engineering support services, steady state operations, basic and applied research, and routine... the requirements in the NASA NPR to apply EVM principles at the program/project level; nor is it...

  12. The dorsal tegmental noradrenergic projection: an analysis of its role in maze learning.

    PubMed

    Roberts, D C; Price, M T; Fibiger, H C

    1976-04-01

    The hypothesis that the noradrenergic projection from the locus coeruleus (LC) to the cerebral cortex and hippocampus is an important neural substrate for learning was evaluated. Maze performance was studied in rats receiving either electrolytic lesions of LC or 6-hydroxydopamine (6-OHDA) lesions of the dorsal tegmental noradrenergic projection. The LC lesions did not disrupt the acquisition of a running response for food reinforcement in an L-shaped runway, even though hippocampal-cortical norepinephrine (NE) was reduced to 29%. Greater telencephalic NE depletions (to 6% of control levels) produced by 6-OHDA also failed to disrupt the acquisition of this behavior or to impair the acquisition of a food-reinforced position habit in a T-maze. Neither locomotor activity nor habituation to a novel environment was affected by the 6-OHDA lesions. Rats with such lesions were, however, found to be significantly more distractible than were controls during the performance of a previously trained response. The hypothesis that telencephalic NE is of fundamental importance in learning was not supported. The data suggest that this system may participate in attentional mechanisms.

  13. Coherent Lidar Activities at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Kavaya, Michael J.; Amzajerdian, Farzin; Koch, Grady J.; Singh, Upendra N.; Yu, Jirong

    2007-01-01

    NASA Langley Research Center has been developing and using coherent lidar systems for many years. The current projects at LaRC are the Global Wind Observing Sounder (GWOS) mission preparation, the Laser Risk Reduction Program (LRRP), the Instrument Incubator Program (IIP) compact, rugged Doppler wind lidar project, the Autonomous precision Landing and Hazard detection and Avoidance Technology (ALHAT) project for lunar landing, and the Skywalker project to find and use thermals to extend UAV flight time. These five projects encompass coherent lidar technology development; characterization, validation, and calibration facilities; compact, rugged packaging; computer simulation; trade studies; data acquisition, processing, and display development; system demonstration; and space mission design. This paper will further discuss these activities at LaRC.

  14. Federal Motor Carrier Safety Administration’s Advanced System Testing Utilizing a Data Acquisition System on the Highways (FAST DASH) Safety Technology Evaluation Project #2: Driver Monitoring Final Report.

    DOT National Transportation Integrated Search

    2016-12-01

    An independent evaluation of a non-video-based onboard monitoring system (OBMS) was conducted. The objective was to determine if the OBMS system performed reliably, improved driving safety and performance, and improved fuel efficiency in a commercial...

  15. Rotorcraft Conceptual Design Environment

    DTIC Science & Technology

    2009-10-01

    systems engineering design tool sets. The DaVinci Project vision is to develop software architecture and tools specifically for acquisition system...enable movement of that information to and from analyses. Finally, a recently developed rotorcraft system analysis tool is described. Introduction...information to and from analyses. Finally, a recently developed rotorcraft system analysis tool is described. 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION

  16. Federal Motor Carrier Safety Administration’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #2 : driver monitoring, final report.

    DOT National Transportation Integrated Search

    2016-11-01

    An independent evaluation of a non-video-based onboard monitoring system (OBMS) was conducted. The objective was to determine if the OBMS system performed reliably, improved driving safety and performance, and improved fuel efficiency in a commercial...

  17. CDP - Adaptive Supervisory Control and Data Acquisition (SCADA) Technology for Infrastructure Protection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marco Carvalho; Richard Ford

    2012-05-14

    Supervisory Control and Data Acquisition (SCADA) Systems are a type of Industrial Control System characterized by the centralized (or hierarchical) monitoring and control of geographically dispersed assets. SCADA systems combine acquisition and network components to provide data gathering, transmission, and visualization for centralized monitoring and control. However these integrated capabilities, especially when built over legacy systems and protocols, generally result in vulnerabilities that can be exploited by attackers, with potentially disastrous consequences. Our research project proposal was to investigate new approaches for secure and survivable SCADA systems. In particular, we were interested in the resilience and adaptability of large-scale mission-criticalmore » monitoring and control infrastructures. Our research proposal was divided in two main tasks. The first task was centered on the design and investigation of algorithms for survivable SCADA systems and a prototype framework demonstration. The second task was centered on the characterization and demonstration of the proposed approach in illustrative scenarios (simulated or emulated).« less

  18. FMCSA’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #2 : technology brief.

    DOT National Transportation Integrated Search

    2016-11-01

    The Federal Motor Carrier Safety Administration (FMCSA) established the FAST DASH program to perform efficient independent evaluations of promising safety technologies aimed at commercial vehicle operations. In this second FAST DASH safety technology...

  19. Fluorescence guided lymph node biopsy in large animals using direct image projection device

    NASA Astrophysics Data System (ADS)

    Ringhausen, Elizabeth; Wang, Tylon; Pitts, Jonathan; Akers, Walter J.

    2016-03-01

    The use of fluorescence imaging for aiding oncologic surgery is a fast growing field in biomedical imaging, revolutionizing open and minimally invasive surgery practices. We have designed, constructed, and tested a system for fluorescence image acquisition and direct display on the surgical field for fluorescence guided surgery. The system uses a near-infrared sensitive CMOS camera for image acquisition, a near-infra LED light source for excitation, and DLP digital projector for projection of fluorescence image data onto the operating field in real time. Instrument control was implemented in Matlab for image capture, processing of acquired data and alignment of image parameters with the projected pattern. Accuracy of alignment was evaluated statistically to demonstrate sensitivity to small objects and alignment throughout the imaging field. After verification of accurate alignment, feasibility for clinical application was demonstrated in large animal models of sentinel lymph node biopsy. Indocyanine green was injected subcutaneously in Yorkshire pigs at various locations to model sentinel lymph node biopsy in gynecologic cancers, head and neck cancer, and melanoma. Fluorescence was detected by the camera system during operations and projected onto the imaging field, accurately identifying tissues containing the fluorescent tracer at up to 15 frames per second. Fluorescence information was projected as binary green regions after thresholding and denoising raw intensity data. Promising results with this initial clinical scale prototype provided encouraging results for the feasibility of optical projection of acquired luminescence during open oncologic surgeries.

  20. Virtual temporal bone dissection system: OSU virtual temporal bone system: development and testing.

    PubMed

    Wiet, Gregory J; Stredney, Don; Kerwin, Thomas; Hittle, Bradley; Fernandez, Soledad A; Abdel-Rasoul, Mahmoud; Welling, D Bradley

    2012-03-01

    The objective of this project was to develop a virtual temporal bone dissection system that would provide an enhanced educational experience for the training of otologic surgeons. A randomized, controlled, multi-institutional, single-blinded validation study. The project encompassed four areas of emphasis: structural data acquisition, integration of the system, dissemination of the system, and validation. Structural acquisition was performed on multiple imaging platforms. Integration achieved a cost-effective system. Dissemination was achieved on different levels including casual interest, downloading of software, and full involvement in development and validation studies. A validation study was performed at eight different training institutions across the country using a two-arm randomized trial where study subjects were randomized to a 2-week practice session using either the virtual temporal bone or standard cadaveric temporal bones. Eighty subjects were enrolled and randomized to one of the two treatment arms; 65 completed the study. There was no difference between the two groups using a blinded rating tool to assess performance after training. A virtual temporal bone dissection system has been developed and compared to cadaveric temporal bones for practice using a multicenter trial. There was no statistical difference between practice on the current simulator compared to practice on human cadaveric temporal bones. Further refinements in structural acquisition and interface design have been identified, which can be implemented prior to full incorporation into training programs and used for objective skills assessment. Copyright © 2012 The American Laryngological, Rhinological, and Otological Society, Inc.

  1. Tracking and data relay satellite system - NASA's new spacecraft data acquisition system

    NASA Technical Reports Server (NTRS)

    Schneider, W. C.; Garman, A. A.

    1979-01-01

    This paper describes NASA's new spacecraft acquisition system provided by the Tracking and Data Relay Satellite System (TDRSS). Four satellites in geostationary orbit and a ground terminal will provide complete tracking, telemetry, and command service for all of NASA's orbital satellites below a 12,000 km altitude. Western Union will lease the system, operate the ground terminal and provide operational satellite control. NASA's network control center will be the focal point for scheduling user services and controlling the interface between TDRSS and the NASA communications network, project control centers, and data processing. TDRSS single access user spacecraft data systems will be designed for time shared data relay support, and reimbursement policy and rate structure for non-NASA users are being developed.

  2. Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

    NASA Technical Reports Server (NTRS)

    Thomas, Leann; Utley, Dawn

    2006-01-01

    While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

  3. Noninvasive photoacoustic detecting intraocular foreign bodies with an annular transducer array.

    PubMed

    Yang, Diwu; Zeng, Lvming; Pan, Changning; Zhao, Xuehui; Ji, Xuanrong

    2013-01-14

    We present a fast photoacoustic imaging system based on an annular transducer array for detection of intraocular foreign bodies. An eight-channel data acquisition system is applied to capture the photoacoustic signals using multiplexing and the total time of data acquisition and transferring is within 3 s. A limited-view filtered back projection algorithm is used to reconstruct the photoacoustic images. Experimental models of intraocular metal and glass foreign bodies were constructed on ex vivo pig's eyes and clear photoacoustic images of intraocular foreign bodies were obtained. Experimental results demonstrate the photoacoustic imaging system holds the potential for in clinic detecting the intraocular foreign bodies.

  4. Evaluation of imaging quality for flat-panel detector based low dose C-arm CT system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seo, Chang-Woo; Cha, Bo Kyung; Jeon, Sungchae

    The image quality associated with the extent of the angle of gantry rotation, the number of projection views, and the dose of X-ray radiation was investigated in flat-panel detector (FPD) based C-arm cone-beam computed tomography (CBCT) system for medical applications. A prototype CBCT system for the projection acquisition used the X-ray tube (A-132, Varian inc.) having rhenium-tungsten molybdenum target and flat panel a-Si X-ray detector (PaxScan 4030CB, Varian inc.) having a 397 x 298 mm active area with 388 μm pixel pitch and 1024 x 768 pixels in 2 by 2 binning mode. The performance comparison of X-ray imaging qualitymore » was carried out using the Feldkamp, Davis, and Kress (FDK) reconstruction algorithm between different conditions of projection acquisition. In this work, head-and-dental (75 kVp/20 mA) and chest (90 kVp/25 mA) phantoms were used to evaluate the image quality. The 361 (30 fps x 12 s) projection data during 360 deg. gantry rotation with 1 deg. interval for the 3D reconstruction were acquired. Parke weighting function were applied to handle redundant data and improve the reconstructed image quality in a mobile C-arm system with limited rotation angles. The reconstructed 3D images were investigated for comparison of qualitative image quality in terms of scan protocols (projection views, rotation angles and exposure dose). Furthermore, the performance evaluation in image quality will be investigated regarding X-ray dose and limited projection data for a FPD based mobile C-arm CBCT system. (authors)« less

  5. 40 CFR 93.126 - Exempt projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... location or feature. Safer non-Federal-aid system roads. Shoulder improvements. Increasing sight distance...). Acquisition of scenic easements. Plantings, landscaping, etc. Sign removal. Directional and informational signs. Transportation enhancement activities (except rehabilitation and operation of historic...

  6. 40 CFR 93.126 - Exempt projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... location or feature. Safer non-Federal-aid system roads. Shoulder improvements. Increasing sight distance...). Acquisition of scenic easements. Plantings, landscaping, etc. Sign removal. Directional and informational signs. Transportation enhancement activities (except rehabilitation and operation of historic...

  7. 40 CFR 93.126 - Exempt projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... location or feature. Safer non-Federal-aid system roads. Shoulder improvements. Increasing sight distance...). Acquisition of scenic easements. Plantings, landscaping, etc. Sign removal. Directional and informational signs. Transportation enhancement activities (except rehabilitation and operation of historic...

  8. The Development and Validation of a Special Education Intelligent Administration Support Program. Final Report.

    ERIC Educational Resources Information Center

    Utah State Univ., Logan. Center for Persons with Disabilities.

    This project studied the effects of implementing a computerized management information system developed for special education administrators. The Intelligent Administration Support Program (IASP), an expert system and database program, assisted in information acquisition and analysis pertaining to the district's quality of decisions and procedures…

  9. FMCSA’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #3 : novel convex mirrors : technology brief.

    DOT National Transportation Integrated Search

    2016-11-01

    The Federal Motor Carrier Safety Administration (FMCSA) established the FAST DASH program to perform efficient independent evaluations of promising safety technologies aimed at commercial vehicle operations. In this third FAST DASH safety technology ...

  10. 7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...

  11. 7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...

  12. 7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... specifications for transmission construction projects which are not based on RUS approved line design data or do...) Communications and control facilities. (1) This paragraph (g) covers microwave and powerline carrier communications systems, load control, and supervisory control and data acquisition (SCADA) systems. (2) The...

  13. Laser program annual report, 1977. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bender, C.F.; Jarman, B.D.

    1978-07-01

    An overview is given of the laser fusion program. The solid-state program covers the Shiva and Nova projects. Laser components, control systems, alignment systems, laser beam diagnostics, power conditioning, and optical components are described. The fusion experimental program concerns the diagnostics and data acquisition associated with Argus and Shiva. (MOW)

  14. Conference on Real-Time Computer Applications in Nuclear, Particle and Plasma Physics, 6th, Williamsburg, VA, May 15-19, 1989, Proceedings

    NASA Technical Reports Server (NTRS)

    Pordes, Ruth (Editor)

    1989-01-01

    Papers on real-time computer applications in nuclear, particle, and plasma physics are presented, covering topics such as expert systems tactics in testing FASTBUS segment interconnect modules, trigger control in a high energy physcis experiment, the FASTBUS read-out system for the Aleph time projection chamber, a multiprocessor data acquisition systems, DAQ software architecture for Aleph, a VME multiprocessor system for plasma control at the JT-60 upgrade, and a multiasking, multisinked, multiprocessor data acquisition front end. Other topics include real-time data reduction using a microVAX processor, a transputer based coprocessor for VEDAS, simulation of a macropipelined multi-CPU event processor for use in FASTBUS, a distributed VME control system for the LISA superconducting Linac, a distributed system for laboratory process automation, and a distributed system for laboratory process automation. Additional topics include a structure macro assembler for the event handler, a data acquisition and control system for Thomson scattering on ATF, remote procedure execution software for distributed systems, and a PC-based graphic display real-time particle beam uniformity.

  15. High-speed large angle mammography tomosynthesis system

    NASA Astrophysics Data System (ADS)

    Eberhard, Jeffrey W.; Staudinger, Paul; Smolenski, Joe; Ding, Jason; Schmitz, Andrea; McCoy, Julie; Rumsey, Michael; Al-Khalidy, Abdulrahman; Ross, William; Landberg, Cynthia E.; Claus, Bernhard E. H.; Carson, Paul; Goodsitt, Mitchell; Chan, Heang-Ping; Roubidoux, Marilyn; Thomas, Jerry A.; Osland, Jacqueline

    2006-03-01

    A new mammography tomosynthesis prototype system that acquires 21 projection images over a 60 degree angular range in approximately 8 seconds has been developed and characterized. Fast imaging sequences are facilitated by a high power tube and generator for faster delivery of the x-ray exposure and a high speed detector read-out. An enhanced a-Si/CsI flat panel digital detector provides greater DQE at low exposure, enabling tomo image sequence acquisitions at total patient dose levels between 150% and 200% of the dose of a standard mammographic view. For clinical scenarios where a single MLO tomographic acquisition per breast may replace the standard CC and MLO views, total tomosynthesis breast dose is comparable to or below the dose in standard mammography. The system supports co-registered acquisition of x-ray tomosynthesis and 3-D ultrasound data sets by incorporating an ultrasound transducer scanning system that flips into position above the compression paddle for the ultrasound exam. Initial images acquired with the system are presented.

  16. The NIFFTE Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Qu, Hai; Niffte Collaboration

    2011-10-01

    The Neutron Induced Fission Fragment Tracking Experiment (NIFFTE) will employ a novel, high granularity, pressurized Time Projection Chamber to measure fission cross-sections of the major actinides to high precision over a wide incident neutron energy range. These results will improve nuclear data accuracy and benefit the fuel cycle in the future. The NIFFTE data acquisition system (DAQ) has been designed and implemented on the prototype TPC. Lessons learned from engineering runs have been incorporated into some design changes that are being implemented before the next run cycle. A fully instrumented sextant of EtherDAQ cards (16 sectors, 496 channels) will be used for the next run cycle. The Maximum Integrated Data Acquisition System (MIDAS) has been chosen and customized to configure and run the experiment. It also meets the requirement for remote control and monitoring of the system. The integration of the MIDAS online database with the persistent PostgreSQL database has been implemented for experiment usage. The detailed design and current status of the DAQ system will be presented.

  17. Flying under the radar: The non-canonical biochemistry and molecular biology of petrobactin from Bacillus anthracis.

    PubMed

    Hagan, A K; Carlson, P E; Hanna, P C

    2016-10-01

    The dramatic, rapid growth of Bacillus anthracis that occurs during systemic anthrax implies a crucial requirement for the efficient acquisition of iron. While recent advances in our understanding of B. anthracis iron acquisition systems indicate the use of strategies similar to other pathogens, this review focuses on unique features of the major siderophore system, petrobactin. Ways that petrobactin differs from other siderophores include: A. unique ferric iron binding moieties that allow petrobactin to evade host immune proteins; B. a biosynthetic operon that encodes enzymes from both major siderophore biosynthesis classes; C. redundancy in membrane transport systems for acquisition of Fe-petrobactin holo-complexes; and, D. regulation that appears to be controlled predominately by sensing the host-like environmental signals of temperature, CO 2 levels and oxidative stress, as opposed to canonical sensing of intracellular iron levels. We argue that these differences contribute in meaningful ways to B. anthracis pathogenesis. This review will also outline current major gaps in our understanding of the petrobactin iron acquisition system, some projected means for exploiting current knowledge, and potential future research directions. © 2016 John Wiley & Sons Ltd.

  18. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  19. Cybersecurity of Critical Control Networks

    DTIC Science & Technology

    2015-07-14

    project are included below. The tasks include work in link encryption for existing legacy SCADA equipment, where we continue to develop lightweight...language for authoring and monitoring compliance of SCADA systems, including technologies for a “policy monitor” which reports out on any observance issues...Acquisition ( SCADA ). Details of each project are included below. The tasks include work in link encryption for existing legacy SCADA equipment

  20. CO2 Acquisition Membrane (CAM) Project

    NASA Technical Reports Server (NTRS)

    Mason, Larry W.

    2003-01-01

    The CO2 Acquisition Membrane (CAM) project was performed to develop, test, and analyze thin film membrane materials for separation and purification of carbon dioxide (CO2) from mixtures of gases, such as those found in the Martian atmosphere. The membranes developed in this project are targeted toward In Situ Resource Utilization (ISRU) applications, such as In Situ Propellant Production (ISPP) and In Situ Consumables Production (ISCP). These membrane materials may be used in a variety of ISRU systems, for example as the atmospheric inlet filter for an ISPP process to enhance the concentration of CO2 for use as a reactant gas, to passively separate argon and nitrogen trace gases from CO2 for habitat pressurization, to provide a system for removal of CO2 from breathing gases in a closed environment, or within a process stream to selectively separate CO2 from other gaseous components. The membranes identified and developed for CAM were evaluated for use in candidate ISRU processes and other gas separation applications, and will help to lay the foundation for future unmanned sample return and human space missions. CAM is a cooperative project split among three institutions: Lockheed Martin Astronautics (LMA), the Colorado School of Mines (CSM), and Marshall Space Flight Center (MSFC).

  1. Activate/Inhibit KGCS Gateway via Master Console EIC Pad-B Display

    NASA Technical Reports Server (NTRS)

    Ferreira, Pedro Henrique

    2014-01-01

    My internship consisted of two major projects for the Launch Control System.The purpose of the first project was to implement the Application Control Language (ACL) to Activate Data Acquisition (ADA) and to Inhibit Data Acquisition (IDA) the Kennedy Ground Control Sub-Systems (KGCS) Gateway, to update existing Pad-B End Item Control (EIC) Display to program the ADA and IDA buttons with new ACL, and to test and release the ACL Display.The second project consisted of unit testing all of the Application Services Framework (ASF) by March 21st. The XmlFileReader was unit tested and reached 100 coverage. The XmlFileReader class is used to grab information from XML files and use them to initialize elements in the other framework elements by using the Xerces C++ XML Parser; which is open source commercial off the shelf software. The ScriptThread was also tested. ScriptThread manages the creation and activation of script threads. A large amount of the time was used in initializing the environment and learning how to set up unit tests and getting familiar with the specific segments of the project that were assigned to us.

  2. Autonomously acquiring declarative and procedural knowledge for ICAT systems

    NASA Technical Reports Server (NTRS)

    Kovarik, Vincent J., Jr.

    1993-01-01

    The construction of Intelligent Computer Aided Training (ICAT) systems is critically dependent on the ability to define and encode knowledge. This knowledge engineering effort can be broadly divided into two categories: domain knowledge and expert or task knowledge. Domain knowledge refers to the physical environment or system with which the expert interacts. Expert knowledge consists of the set of procedures and heuristics employed by the expert in performing their task. Both these areas are a significant bottleneck in the acquisition of knowledge for ICAT systems. This paper presents a research project in the area of autonomous knowledge acquisition using a passive observation concept. The system observes an expert and then generalizes the observations into production rules representing the domain expert's knowledge.

  3. Data acquisition system for segmented reactor antineutrino detector

    NASA Astrophysics Data System (ADS)

    Hons, Z.; Vlášek, J.

    2017-01-01

    This paper describes the data acquisition system used for data readout from the PMT channels of a segmented detector of reactor antineutrinos with active shielding. Theoretical approach to the data acquisition is described and two possible solutions using QDCs and digitizers are discussed. Also described are the results of the DAQ performance during routine data taking operation of DANSS. DANSS (Detector of the reactor AntiNeutrino based on Solid Scintillator) is a project aiming to measure a spectrum of reactor antineutrinos using inverse beta decay (IBD) in a plastic scintillator. The detector is located close to an industrial nuclear reactor core and is covered by passive and active shielding. It is expected to have about 15000 IBD interactions per day. Light from the detector is sensed by PMT and SiPM.

  4. Human Factors Issues for Controlling Uninhabited Aerial Vehicles: Preliminary Findings in Support of the Canadian Forces Joint Unmanned Aerial Vehicle Surveillance Target Acquisition System Project (Incidence des Facteurs Humains sur le Pilotage des Vehicules Aeriens Telepilotes: Constatations Preliminaires a L’Appui du Projet de Systeme Interarmees D’Acquisition D’Objectif au Moyen de Vehicules Aeriens Telepilotes de Surveillance des Forces Canadiennes)

    DTIC Science & Technology

    2010-11-01

    Misinterpreted communications, crew coordination, rank imbalance or pilot in command and co-pilot syndrome , crew composition, intra-cockpit communication...of sustained operations. They found that MQ-1 Predator crews experienced higher levels of fatigue, emotional exhaustion and burnout relative to 20

  5. A Distributed Data Acquisition System for the Sensor Network of the TAWARA_RTM Project

    NASA Astrophysics Data System (ADS)

    Fontana, Cristiano Lino; Donati, Massimiliano; Cester, Davide; Fanucci, Luca; Iovene, Alessandro; Swiderski, Lukasz; Moretto, Sandra; Moszynski, Marek; Olejnik, Anna; Ruiu, Alessio; Stevanato, Luca; Batsch, Tadeusz; Tintori, Carlo; Lunardon, Marcello

    This paper describes a distributed Data Acquisition System (DAQ) developed for the TAWARA_RTM project (TAp WAter RAdioactivity Real Time Monitor). The aim is detecting the presence of radioactive contaminants in drinking water; in order to prevent deliberate or accidental threats. Employing a set of detectors, it is possible to detect alpha, beta and gamma radiations, from emitters dissolved in water. The Sensor Network (SN) consists of several heterogeneous nodes controlled by a centralized server. The SN cyber-security is guaranteed in order to protect it from external intrusions and malicious acts. The nodes were installed in different locations, along the water treatment processes, in the waterworks plant supplying the aqueduct of Warsaw, Poland. Embedded computers control the simpler nodes, and are directly connected to the SN. Local-PCs (LPCs) control the more complex nodes that consist signal digitizers acquiring data from several detectors. The DAQ in the LPC is split in several processes communicating with sockets in a local sub-network. Each process is dedicated to a very simple task (e.g. data acquisition, data analysis, hydraulics management) in order to have a flexible and fault-tolerant system. The main SN and the local DAQ networks are separated by data routers to ensure the cyber-security.

  6. Gigabit Digital Filter Bank: Digital Backend Subsystem in the VERA Data-Acquisition System

    NASA Astrophysics Data System (ADS)

    Iguchi, Satoru; Kkurayama, Tomoharu; Kawaguchi, Noriyuki; Kawakami, Kazuyuki

    2005-02-01

    The VERA terminal is a new data-acquisition system developed for the VERA project, which is a project to construct a new Japanese VLBI array dedicated to make a 3-D map of our Milky Way Galaxy in terms of high-precision astrometry. New technology, a gigabit digital filter, was introduced in the development. The importance and advantages of a digital filter for radio astronomy have been studied as follows: (1) the digital filter can realize a variety of observation modes and maintain compatibility with different data-acquisition systems (Kiuchi et al. 1997 and Iguchi et al. 2000a), (2) the folding noise occurring in the sampling process can be reduced by combination with a higher-order sampling technique (Iguchi, Kawaguchi 2002), (3) and an ideal sharp cut-off bandedge and a flat amplitude/phase responses are approached by using a large number of taps available to use LSI of a large number of logic cells (Iguchi et al. 2000a). We developed the custom Finite Impulse Response filter chips and manufactured the Gigabit Digital Filter Banks (GDFBs) as a digital backend subsystem in the VERA terminal. In this paper, the design and development of the GDFB are presented in detail, and the performances and demonstrations of the developed GDFB are shown.

  7. A first-generation software product line for data acquisition systems in astronomy

    NASA Astrophysics Data System (ADS)

    López-Ruiz, J. C.; Heradio, Rubén; Cerrada Somolinos, José Antonio; Coz Fernandez, José Ramón; López Ramos, Pablo

    2008-07-01

    This article presents a case study on developing a software product line for data acquisition systems in astronomy based on the Exemplar Driven Development methodology and the Exemplar Flexibilization Language tool. The main strategies to build the software product line are based on the domain commonality and variability, the incremental scope and the use of existing artifacts. It consists on a lean methodology with little impact on the organization, suitable for small projects, which reduces product line start-up time. Software Product Lines focuses on creating a family of products instead of individual products. This approach has spectacular benefits on reducing the time to market, maintaining the know-how, reducing the development costs and increasing the quality of new products. The maintenance of the products is also enhanced since all the data acquisition systems share the same product line architecture.

  8. Image acquisition unit for the Mayo/IBM PACS project

    NASA Astrophysics Data System (ADS)

    Reardon, Frank J.; Salutz, James R.

    1991-07-01

    The Mayo Clinic and IBM Rochester, Minnesota, have jointly developed a picture archiving, distribution and viewing system for use with Mayo's CT and MRI imaging modalities. Images are retrieved from the modalities and sent over the Mayo city-wide token ring network to optical storage subsystems for archiving, and to server subsystems for viewing on image review stations. Images may also be retrieved from archive and transmitted back to the modalities. The subsystems that interface to the modalities and communicate to the other components of the system are termed Image Acquisition Units (LAUs). The IAUs are IBM Personal System/2 (PS/2) computers with specially developed software. They operate independently in a network of cooperative subsystems and communicate with the modalities, archive subsystems, image review server subsystems, and a central subsystem that maintains information about the content and location of images. This paper provides a detailed description of the function and design of the Image Acquisition Units.

  9. The SERENDIP piggyback SETI project

    NASA Technical Reports Server (NTRS)

    Lampton, M.; Bowyer, S.; Werthimer, D.; Donnelly, C.; Herrick, W.

    1992-01-01

    The SERENDIP project is an ongoing program of monitoring and processing broadband radio signals acquired by existing radio astronomy observatories. SERENDIP operates in a piggyback mode: it makes use of whatever observing plan (sequence of frequencies, sky coordinates, and polarizations) is under way at its host observatory. Moreover, the SERENDIP data acquisition system, once installed, operates autonomously. This approach makes it possible to obtain large amounts of high quality observing time in a manner that is economical and that does not adversely affect ongoing radio astronomy survey work. The SERENDIP II system has been installed at the NRAO 300-foot telescope at Green Bank, West Virginia, and has operated there for several thousand hours. In this report, we summarize our findings from these observations and describe the present status of the project. Two key elements of SERENDIP are the automated data acquisition system that uses adaptive thresholds and logs only statistically significant peaks in the real-time power spectra, and the subsequent off-line analysis programs that identify and reject a variety of interference signals. Several specific correlations have been identified that offer promise. At present, the development and testing of these interference rejection algorithms is the main thrust of our work.

  10. The SERENDIP piggyback SETI project.

    PubMed

    Lampton, M; Bowyer, S; Werthimer, D; Donnelly, C; Herrick, W

    1992-01-01

    The SERENDIP project is an ongoing program of monitoring and processing broadband radio signals acquired by existing radio astronomy observatories. SERENDIP operates in a piggyback mode: it makes use of whatever observing plan (sequence of frequencies, sky coordinates, and polarizations) is under way at its host observatory. Moreover, the SERENDIP data acquisition system, once installed, operates autonomously. This approach makes it possible to obtain large amounts of high quality observing time in a manner that is economical and that does not adversely affect ongoing radio astronomy survey work. The SERENDIP II system has been installed at the NRAO 300-foot telescope at Green Bank, West Virginia, and has operated there for several thousand hours. In this report, we summarize our findings from these observations and describe the present status of the project. Two key elements of SERENDIP are the automated data acquisition system that uses adaptive thresholds and logs only statistically significant peaks in the real-time power spectra, and the subsequent off-line analysis programs that identify and reject a variety of interference signals. Several specific correlations have been identified that offer promise. At present, the development and testing of these interference rejection algorithms is the main thrust of our work.

  11. Slippery road detection and evaluation.

    DOT National Transportation Integrated Search

    2012-05-31

    The key project objectives were: 1) the demonstration and evaluation of a low cost data acquisition system that would provide a rich data set accumulated from multiple vehicles, and 2) establish how this data, coupled with situational data from other...

  12. Transit grants : need for improved predictability, data, and monitoring in application processing

    DOT National Transportation Integrated Search

    2000-08-01

    The Federal Transit Administration (FTA) provides states, local and regional transportation providers, and others with grants for the construction, acquisition, improvement, and operation of transit systems and projects through a variety of programs....

  13. Novel high speed fiber-optic pressure sensor systems.

    DOT National Transportation Integrated Search

    2014-03-01

    The goal of this project is to develop a complete test of this technology for high-speed, high-accuracy applications, specifically cost-effective data acquisition techniques and practical mounting methods tailored for the subject environment. The sec...

  14. Secure and Robust Iris Recognition Using Random Projections and Sparse Representations.

    PubMed

    Pillai, Jaishanker K; Patel, Vishal M; Chellappa, Rama; Ratha, Nalini K

    2011-09-01

    Noncontact biometrics such as face and iris have additional benefits over contact-based biometrics such as fingerprint and hand geometry. However, three important challenges need to be addressed in a noncontact biometrics-based authentication system: ability to handle unconstrained acquisition, robust and accurate matching, and privacy enhancement without compromising security. In this paper, we propose a unified framework based on random projections and sparse representations, that can simultaneously address all three issues mentioned above in relation to iris biometrics. Our proposed quality measure can handle segmentation errors and a wide variety of possible artifacts during iris acquisition. We demonstrate how the proposed approach can be easily extended to handle alignment variations and recognition from iris videos, resulting in a robust and accurate system. The proposed approach includes enhancements to privacy and security by providing ways to create cancelable iris templates. Results on public data sets show significant benefits of the proposed approach.

  15. Thirteenth Annual Acquisition Research Symposium. Acquisition Research: Creating Synergy for Informed Change. Volume 1

    DTIC Science & Technology

    2016-04-30

    renewable energy projects with a focus on novel onshore/offshore and small/large scale wind turbine designs for expanding their operational range and...ROA to estimate the values of maintenance options created by the implementation of PHM in wind turbines . When an RUL is predicted for a subsystem...predicted for the system. The section titled Example— Wind Turbine With an Outcome-Based Contract presents a case study for a PHM enabled wind

  16. Evaluation of PROforma as a language for implementing medical guidelines in a practical context

    PubMed Central

    Sutton, David R; Taylor, Paul; Earle, Kenneth

    2006-01-01

    Background PROforma is one of several languages that allow clinical guidelines to be expressed in a computer-interpretable manner. How these languages should be compared, and what requirements they should meet, are questions that are being actively addressed by a community of interested researchers. Methods We have developed a system to allow hypertensive patients to be monitored and assessed without visiting their GPs (except in the most urgent cases). Blood pressure measurements are performed at the patients' pharmacies and a web-based system, created using PROforma, makes recommendations for continued monitoring, and/or changes in medication. The recommendations and measurements are transmitted electronically to a practitioner with authority to issue and change prescriptions. We evaluated the use of PROforma during the knowledge acquisition, analysis, design and implementation of this system. The analysis focuses on the logical adequacy, heuristic power, notational convenience, and explanation support provided by the PROforma language. Results PROforma proved adequate as a language for the implementation of the clinical reasoning required by this project. However a lack of notational convenience led us to use UML activity diagrams, rather than PROforma process descriptions, to create the models that were used during the knowledge acquisition and analysis phases of the project. These UML diagrams were translated into PROforma during the implementation of the project. Conclusion The experience accumulated during this study highlighted the importance of structure preserving design, that is to say that the models used in the design and implementation of a knowledge-based system should be structurally similar to those created during knowledge acquisition and analysis. Ideally the same language should be used for all of these models. This means that great importance has to be attached to the notational convenience of these languages, by which we mean the ease with which they can be read, written, and understood by human beings. The importance of notational convenience arises from the fact that a language used during knowledge acquisition and analysis must be intelligible to the potential users of a system, and to the domain experts who provide the knowledge that will be used in its construction. PMID:16597341

  17. Evaluation of PROforma as a language for implementing medical guidelines in a practical context.

    PubMed

    Sutton, David R; Taylor, Paul; Earle, Kenneth

    2006-04-05

    PROforma is one of several languages that allow clinical guidelines to be expressed in a computer-interpretable manner. How these languages should be compared, and what requirements they should meet, are questions that are being actively addressed by a community of interested researchers. We have developed a system to allow hypertensive patients to be monitored and assessed without visiting their GPs (except in the most urgent cases). Blood pressure measurements are performed at the patients' pharmacies and a web-based system, created using PROforma, makes recommendations for continued monitoring, and/or changes in medication. The recommendations and measurements are transmitted electronically to a practitioner with authority to issue and change prescriptions. We evaluated the use of PROforma during the knowledge acquisition, analysis, design and implementation of this system. The analysis focuses on the logical adequacy, heuristic power, notational convenience, and explanation support provided by the PROforma language. PROforma proved adequate as a language for the implementation of the clinical reasoning required by this project. However a lack of notational convenience led us to use UML activity diagrams, rather than PROforma process descriptions, to create the models that were used during the knowledge acquisition and analysis phases of the project. These UML diagrams were translated into PROforma during the implementation of the project. The experience accumulated during this study highlighted the importance of structure preserving design, that is to say that the models used in the design and implementation of a knowledge-based system should be structurally similar to those created during knowledge acquisition and analysis. Ideally the same language should be used for all of these models. This means that great importance has to be attached to the notational convenience of these languages, by which we mean the ease with which they can be read, written, and understood by human beings. The importance of notational convenience arises from the fact that a language used during knowledge acquisition and analysis must be intelligible to the potential users of a system, and to the domain experts who provide the knowledge that will be used in its construction.

  18. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  19. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  20. 32 CFR 644.5 - Mineral Acquisition Practices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Mineral Acquisition Practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral Acquisition Practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  1. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Mineral acquisition practices. 644.5 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a... accommodate projects authorized by the Congress is to permit the reservation of the minerals in the land...

  2. Modern Sorters for Soil Segregation on Large Scale Remediation Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shonka, J.J.; Kelley, J.E.; O'Brien, J.M.

    2008-01-15

    In the mid-1940's, Dr. C. Lapointe developed a Geiger tube based uranium ore scanner and picker to replace hand-cobbing. In the 1990's, a modern version of the Lapointe Picker for soil sorting was developed around the need to clean the Johnston Atoll of plutonium. It worked well with sand, but these systems are ineffective with soil, especially with wet conditions. Additionally, several other constraints limited throughput. Slow moving belts and thin layers of material on the belt coupled with the use of multiple small detectors and small sorting gates make these systems ineffective for high throughput. Soil sorting of clay-bearingmore » soils and building debris requires a new look at both the material handling equipment, and the radiation detection methodology. A new class of Super-Sorters has attained throughput of one hundred times that of the old designs. Higher throughput means shorter schedules which reduce costs substantially. The planning, cost, implementation, and other site considerations for these new Super-Sorters are discussed. Modern soil segregation was developed by Ed Bramlitt of the Defense Nuclear Agency for clean up at Johnston Atoll. The process eventually became the Segmented Gate System (SGS). This system uses an array of small sodium iodide (NaI) detectors, each viewing a small volume (segment), that control a gate. The volume in the gate is approximately one kg. This system works well when the material to be processed is sand; however, when the material is wet and sticky (soils with clays) the system has difficulty moving the material through the gates. Super-Sorters are a new class of machine designed to take advantage of high throughput aggregate processing conveyors, large acquisition volumes, and large NaI detectors using gamma spectroscopy. By using commercially available material handling equipment, the system can attain processing rates of up to 400 metric tons/hr with spectrum acquisition approximately every 0.5 sec, so the acquisition volume is 50 kilograms or less. Smaller sorting volumes can be obtained with lower throughput or by re-sorting the diverted material. This equipment can also handle large objects. The use of spectroscopy systems allows several regions of- interest to be set. Super-Sorters can bring waste processing charges down to less than $30/ metric ton on smaller jobs and can save hundreds of dollars per metric ton in disposal charges. The largest effect on the overall project cost occurs during planning and implementation. The overall goal is reduction of the length of the project, which dictates the most efficient soil processing. With all sorting systems the parameters that need to be accounted for are matrix type, soil feed rate, soil pre-processing, site conditions, and regulatory issues. The soil matrix and its ability to flow are extremely crucial to operations. It is also important to consider that as conditions change (i.e., moisture), the flowability of the soil matrix will change. Many soil parameters have to be considered: cohesive strength, internal and wall friction, permeability, and bulk density as a function of consolidating pressure. Clay bearing soils have very low permeability and high cohesive strength which makes them difficult to process, especially when wet. Soil feed speed is dependent on the equipment present and the ability to move the soil in the Super-Sorter processing area. When a Super-Sorter is running at 400 metric tons per hour it is difficult to feed the system. As an example, front-end loaders with large buckets would move approximately 5-10 metric tons of material, and 400 metric tons per hour would require 50-100 bucket-loads per hour to attain. Because the flowability of the soil matrix is important, poor material is often pre-processed before it is added to the feed hopper of the 'survey' conveyor. This pre-processing can consist of a 'grizzly' to remove large objects from the soil matrix, followed screening plant to prepare the soil so that it feeds well. Hydrated lime can be added to improve material properties. Site conditions (site area, typical weather conditions, etc.) also play a large part in project planning. Downtime lengthens project schedule and costs. The system must be configured to handle weather conditions or other variables that affect throughput. The largest single factor that plays into the project design is the regulatory environment. Before a sorter can be utilized, an averaging mass must be established by the regulator(s). There currently are no standards or guidelines in this area. The differences between acquisition mass and averaging mass are very important. The acquisition mass is defined based on the acquisition time and the geometry of the detectors. The averaging mass can then be as small as the acquisition mass or as large as several hundred tons (the averaging mass is simply the sum of a number of acquisitions). It is important to define volumetric limits and any required point-source limits. Super-Sorters handle both of these types of limits simultaneously. The minimum detectable activity for Super- Sorters is a function of speed. The chart below illustrates the detection confidence level for a 0.1 {mu}Ci point source of Ra-226 vs alarm point for three different sorter process rates. The minimal detection activity and diversion volume for a Super-Sorter is also a function of the acquisition mass. The curves were collected using a 0-15 kg acquisition mass. Diversion volumes ranged from 20-30 kg for a point source diversion. Soil Super-Sorters should be considered for every D and D project where it is desirable to reduce the waste stream. A volume reduction of 1:1000 can be gained for each pass through a modern sorter, resulting in significant savings in disposal costs.« less

  3. 48 CFR 301.607-70 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... General. In accordance with the Federal Acquisition Certification—Program and Project Managers (FAC-P/PM) program, HHS has established a certification program for Program or Project Managers. See HHS' Federal Acquisition Certification—Program and Project Managers Handbook (P/PM Handbook) for information on the methods...

  4. Reclassification and Documentation in a Medium-sized Medical Center Library: The MTST System in the Simultaneous Production of Catalog Cards and a Computer Stored Record

    PubMed Central

    Love, Erika; Butzin, Diane; Robinson, Robert E.; Lee, Soo

    1971-01-01

    A project to recatalog and reclassify the book collection of the Bowman Gray School of Medicine Library utilizing the Magnetic Tape/Selectric Typwriter system for simultaneous catalog card production and computer stored data acquisition marks the beginning of eventual computerization of all library operations. A keyboard optical display system will be added by late 1970. Major input operations requiring the creation of “hard copy” will continue via the MTST system. Updating, editing and retrieval operations as well as input without hard copy production will be done through the “on-line” keyboard optical display system. Once the library's first data bank, the book catalog, has been established the computer may be consulted directly for library holdings from any optical display terminal throughout the medical center. Three basic information retrieval operations may be carried out through “on-line” optical display terminals. Output options include the reproduction of part or all of a given document, or the generation of statistical data, which are derived from two Acquisition Code lines. The creation of a central bibliographic record of Bowman Gray Faculty publications patterned after the cataloging program is presently under way. The cataloging and computer storage of serial holdings records will begin after completion of the reclassification project. All acquisitions added to the collection since October 1967 are computer-stored and fully retrievable. Reclassification of older titles will be completed in early 1971. PMID:5542915

  5. Airborne Wind Profiling With the Data Acquisition and Processing System for a Pulsed 2-Micron Coherent Doppler Lidar System

    NASA Technical Reports Server (NTRS)

    Beyon, Jeffrey Y.; Koch, Grady J.; Kavaya, Michael J.

    2012-01-01

    A pulsed 2-micron coherent Doppler lidar system at NASA Langley Research Center in Virginia flew on the NASA's DC-8 aircraft during the NASA Genesis and Rapid Intensification Processes (GRIP) during the summer of 2010. The participation was part of the project Doppler Aerosol Wind Lidar (DAWN) Air. Selected results of airborne wind profiling are presented and compared with the dropsonde data for verification purposes. Panoramic presentations of different wind parameters over a nominal observation time span are also presented for selected GRIP data sets. The realtime data acquisition and analysis software that was employed during the GRIP campaign is introduced with its unique features.

  6. "Data Acquisition Systems"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unterweger, Michael; Costrell, Louis deceased

    2009-07-07

    This project involved support for Lou Costrell and myself in the development of IEEE and IEC standards for nuclear counting and data acquisition systems. Over the years, as a result of this support, Lou and I were able to attend standards meetings of IEEE and IEC, which led directly to the publication of many standards for NIM systems, FastBus and CAMAC. We also chaired several writing committees as well as ANSI N42 (Nuclear instrumentation), IEEE NIM (NIM standard), IEEE NID (NPSS nuclear instruments and detector) and IEC TC45 WG9 (Nuclear instrumentation). Through this support we were able to assure thatmore » the interests of the US and DOE were expressed and implemented in the various standards.« less

  7. 48 CFR 917.7301-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 917.7301-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Program Research and Development Announcements 917.7301-1... in entering into arrangements for research, development, and related projects in specified areas of...

  8. Instrumentation of Navistar truck for data collection.

    DOT National Transportation Integrated Search

    2013-01-01

    The overarching goal of this project was to instrument the new MnDOT Navistar truck used at MN Road. A : rugged data acquisition, data recording and wireless transmission system was established for collection of various : sensor signals from the truc...

  9. Case Study: IRS Business System Modernization Process Improvement

    DTIC Science & Technology

    2004-03-01

    31 CMU/SEI-2004-TR-002 iii List of Figures Figure 1: Managing Organizational Change ............................................................ 9...and constant emphasis on training in project management and acquisition, as well as in the SA-CMM. Figure 1: Managing Organizational Change Other

  10. 48 CFR 1552.237-74 - Publicity.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 1552.237-74 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND... removal or remedial activities under the Comprehensive Environmental Response, Compensation and Liability... on-scene coordinator (or Project Officer) prior to releasing any information to the news media...

  11. 48 CFR 1552.237-74 - Publicity.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 1552.237-74 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND... removal or remedial activities under the Comprehensive Environmental Response, Compensation and Liability... on-scene coordinator (or Project Officer) prior to releasing any information to the news media...

  12. 48 CFR 1552.237-74 - Publicity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 1552.237-74 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND... removal or remedial activities under the Comprehensive Environmental Response, Compensation and Liability... on-scene coordinator (or Project Officer) prior to releasing any information to the news media...

  13. Modeling the Evolution of a Science Project in Software-Reliant System Acquisition Programs

    DTIC Science & Technology

    2013-07-24

    might: • Limit worker burnout • Perform better regarding schedule 10 Software Technology Conference April 10, 2013 © 2013 Carnegie Mellon...University The Evolution of a Science Project Key Preliminary Findings -3 The tipping point contributes to the “90% Done” Syndrome Percentage...worker burnout - SP User Satisfaction SP increasing satisfaction indicated satisfaction + + B3 Moderating User Satisfaction overage switch demand switch

  14. Incorporating Trust into Department of Defense Acquisition Risk Management

    DTIC Science & Technology

    2014-09-01

    Budget, Paperwork Reduction Project (0704–0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE September 2014 3. REPORT TYPE...Sydney, Australia. Paper published and archived, SETE Conference Proceedings. xviii Langford, Gary O. 2012. Engineering Systems Integration Theory...and knowledge on the subject were invaluable in keeping me focused and nudging me in the proper direction. This project would have been impossible

  15. Mars oxygen production system design

    NASA Technical Reports Server (NTRS)

    Cotton, Charles E.; Pillow, Linda K.; Perkinson, Robert C.; Brownlie, R. P.; Chwalowski, P.; Carmona, M. F.; Coopersmith, J. P.; Goff, J. C.; Harvey, L. L.; Kovacs, L. A.

    1989-01-01

    The design and construction phase is summarized of the Mars oxygen demonstration project. The basic hardware required to produce oxygen from simulated Mars atmosphere was assembled and tested. Some design problems still remain with the sample collection and storage system. In addition, design and development of computer compatible data acquisition and control instrumentation is ongoing.

  16. Evaluating Student-Teacher Linkage Data in Teacher Incentive Fund (TIF) Sites: Acquisition, Verification, and System Development. The Harvesting Project

    ERIC Educational Resources Information Center

    Watson, Jeffery; Witham, Peter; St. Louis, Timothy

    2010-01-01

    The U.S. Department of Education Teacher Incentive Fund (TIF) seeks to transform education compensation systems so that principal and teacher performance (measured through classroom productivity measures) connects to compensation. Classroom-level productivity measures require robust student-teacher linkage data. Organizations such as the…

  17. Mars oxygen production system design

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This report summarizes the design and construction of the Mars oxygen demonstration project. The basic hardware required to produce oxygen from simulated Mars atmosphere has been assembled and tested. Some design problems still remain with the sample collection and storage system. In addition, design and development of computer data acquisition and control instrumentation is continuing.

  18. A Multi-criterial Decision Support System for Forest Management

    Treesearch

    Donald Nute; Geneho Kim; Walter D. Potter; Mark J. Twery; H. Michael Rauscher; Scott Thomasma; Deborah Bennett; Peter Kollasch

    1999-01-01

    We describe a research project that has as its goal development of a full-featured decision support system for managing forested land to satisfy multiple criteria represented as timber, wildlife, water, ecological, and wildlife objectives. The decision process proposed for what was originally conceived of as a Northeast Decision Model (NED) includes data acquisition,...

  19. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2010-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  20. Automated ultrafast kilovoltage-megavoltage cone-beam CT for image guided radiotherapy of lung cancer: System description and real-time results.

    PubMed

    Blessing, Manuel; Arns, Anna; Wertz, Hansjoerg; Stsepankou, Dzmitry; Boda-Heggemann, Judit; Hesser, Juergen; Wenz, Frederik; Lohr, Frank

    2018-04-01

    To establish a fully automated kV-MV CBCT imaging method on a clinical linear accelerator that allows image acquisition of thoracic targets for patient positioning within one breath-hold (∼15s) under realistic clinical conditions. Our previously developed FPGA-based hardware unit which allows synchronized kV-MV CBCT projection acquisition is connected to a clinical linear accelerator system via a multi-pin switch; i.e. either kV-MV imaging or conventional clinical mode can be selected. An application program was developed to control the relevant linac parameters automatically and to manage the MV detector readout as well as the gantry angle capture for each MV projection. The kV projections are acquired with the conventional CBCT system. GPU-accelerated filtered backprojection is performed separately for both data sets. After appropriate grayscale normalization both modalities are combined and the final kV-MV volume is re-imported in the CBCT system to enable image matching. To demonstrate adequate geometrical accuracy of the novel imaging system the Penta-Guide phantom QA procedure is performed. Furthermore, a human plastinate and different tumor shapes in a thorax phantom are scanned. Diameters of the known tumor shapes are measured in the kV-MV reconstruction. An automated kV-MV CBCT workflow was successfully established in a clinical environment. The overall procedure, from starting the data acquisition until the reconstructed volume is available for registration, requires ∼90s including 17s acquisition time for 100° rotation. It is very simple and allows target positioning in the same way as for conventional CBCT. Registration accuracy of the QA phantom is within ±1mm. The average deviation from the known tumor dimensions measured in the thorax phantom was 0.7mm which corresponds to an improvement of 36% compared to our previous kV-MV imaging system. Due to automation the kV-MV CBCT workflow is speeded up by a factor of >10 compared to the manual approach. Thus, the system allows a simple, fast and reliable imaging procedure and fulfills all requirements to be successfully introduced into the clinical workflow now, enabling single-breath-hold volume imaging. Copyright © 2018. Published by Elsevier GmbH.

  1. DART -- Data acquisition for the next generation of Fermilab fixed target experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oleynik, G.; Anderson, J.; Appleton, L.

    1994-02-01

    DART is the name of the data acquisition effort for Fermilab experiments taking data in the '94--'95 time frame and beyond. Its charge is to provide a common system of hardware and software, which can be easily configured and extended to meet the wide range of data acquisition requirements of the experiments. Its strategy is to provide incrementally functional data acquisition systems to the experiments at frequent intervals to support the ongoing DA activities of the experiments. DART is a collaborative development effort between the experimenters and the Fermilab Computing Division. Experiments collaborating in DART cover a range of requirementsmore » from 400 Kbytes/sec event readout using a single DA processor, to 200 Mbytes/sec event readout involving 10 parallel readout streams, 10 VME event building planes and greater than 1,000 MIPs of event filter processing. The authors describe the requirements, architecture, and plans for the project and report on its current status.« less

  2. Defense AT and L. Volume 43, Number 1

    DTIC Science & Technology

    2014-02-01

    community on the strategic direction of future space system acquisitions. Should we continue and/or improve aggregated space systems over time or move...desirable. Schedulers must have a firm command of project manage- ment theory and practice and possess leadership and communication skills. Scorecard...idea was recommended by the Defense Sci- ence Board’s Munitions System Reliability report. In the future, such systems conceivably could communicate

  3. Materials Science Clean Room Facility at Tulane University (Final Technical Report)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Altiero, Nicholas

    2010-09-30

    The project involves conversion of a 3,000 sq. ft. area into a clean room facility for materials science research. It will be accomplished in phases. Phase I will involve preparation of the existing space, acquisition and installation of clean room equipped with a pulsed laser deposition (PLD) processing system, and conversion of ancillary space to facilitate the interface with the clean room. From a capital perspective, Phases II and III will involve the acquisition of additional processing, fabrication, and characterization equipment and capabilities.

  4. Telecommunications and data acquisition systems support for Voyager missions to Jupiter and Saturn, 1972-1981, prelaunch through Saturn encounter

    NASA Technical Reports Server (NTRS)

    Traxler, M. R.; Beauchamp, D. F.

    1983-01-01

    The Deep Space Network has supported the Voyager Project for approximately nine years, during which time implementation, testing, and operational support was provided. Four years of this time involved testing prior to launch; the final five years included network operations support and additional network implementation. Intensive and critical support intervals included launch and four planetary encounters. The telecommunications and data acquisition support for the Voyager Missions to Jupiter and Saturn are summarized.

  5. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  6. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  7. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  8. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... projects. 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments...

  9. The implementation of the Human Exploration Demonstration Project (HEDP), a systems technology testbed

    NASA Technical Reports Server (NTRS)

    Rosen, Robert; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the NASA's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment consists of life support systems, physiological monitoring of project crew, a virtual environment work station, and centralized data acquisition and habitat systems health monitoring. The HEDP is an integrated technology demonstrator, as well as an initial operational testbed. There are several robotic systems operational in a simulated planetary landscape external to the habitat environment, to provide representative work loads for the crew. This paper describes the evolution of the HEDP from initial concept to operational project; the status of the HEDP after two years; the final facilities composing the HEDP; the project's role as a NASA Ames Research Center systems technology testbed; and the interim demonstration scenarios that have been run to feature the developing technologies in 1993.

  10. 24 CFR 241.1010 - Feasibility letter.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... Commissioner's estimate of the supportable loan amount, based upon the project's equity in the case of an equity loan and based on the project's purchase price in the case of an acquisition loan, but such...

  11. Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility

    NASA Astrophysics Data System (ADS)

    Luchetta, Adriano; Manduchi, Gabriele; Taliercio, Cesare; Soppelsa, Anton; Paolucci, Francesco; Sartori, Filippo; Barbato, Paolo; Breda, Mauro; Capobianco, Roberto; Molon, Federico; Moressa, Modesto; Polato, Sandro; Simionato, Paola; Zampiva, Enrico

    2013-10-01

    The ITER Neutral Beam Test Facility will be the project's R&D facility for heating neutral beam injectors (HNB) for fusion research operating with H/D negative ions. Its mission is to develop technology to build the HNB prototype injector meeting the stringent HNB requirements (16.5 MW injection power, -1 MeV acceleration energy, 40 A ion current and one hour continuous operation). Two test-beds will be built in sequence in the facility: first SPIDER, the ion source test-bed, to optimize the negative ion source performance, second MITICA, the actual prototype injector, to optimize ion beam acceleration and neutralization. The SPIDER control and data acquisition system is under design. To validate the main architectural choices, a system prototype has been assembled and performance tests have been executed to assess the prototype's capability to meet the control and data acquisition system requirements. The prototype is based on open-source software frameworks running under Linux. EPICS is the slow control engine, MDSplus is the data handler and MARTe is the fast control manager. The prototype addresses low and high-frequency data acquisition, 10 kS/s and 10 MS/s respectively, camera image acquisition, data archiving, data streaming, data retrieval and visualization, real time fast control with 100 μs control cycle and supervisory control.

  12. A Study on Improving Defense Acquisition through the Application of Defense Acquisition Workforce Improvement Act (DAWIA) Concept to Defense Industry Workforce

    DTIC Science & Technology

    2009-09-01

    Executive CAIV Cost As an Independent Variable CAP Critical Acquisition Position CAPM Certified Associate in Project Management CCCM Certified...Professionals (PMP)............................33 b. Certified Associate in Project Management ( CAPM )............34 c. Program Management...34 Table 6. CAPM Requirements (After PMI CAPM , 2009). ...........................................34 Table 7

  13. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less

  14. Controls and measurements of KU engine test cells for biodiesel, SynGas, and assisted biodiesel combustion

    NASA Astrophysics Data System (ADS)

    Cecrle, Eric Daniel

    This thesis is comprised of three unique data acquisition and controls (CDAQ) projects. Each of these projects differs from each other; however, they all include the concept of testing renewable or future fuel sources. The projects were the following: University of Kansas's Feedstock-to-Tailpipe Initiative's Synthesis Gas Reforming rig, Feedstock-to-Tailpipe Initiative's Biodiesel Single Cylinder Test Stand, and a unique Reformate Assisted Biodiesel Combustion architecture. The main responsibility of the author was to implement, develop and test CDAQ systems for the projects. For the Synthesis Gas Reforming rig, this thesis includes a report that summarizes the analysis and solution of building a controls and data acquisition system for this setup. It describes the purpose of the sensors selected along with their placement throughout the system. Moreover, it includes an explanation of the planned data collection system, along with two models describing the reforming process useful for system control. For the Biodiesel Single Cylinder Test Stand, the responsibility was to implement the CDAQ system for data collection. This project comprised a variety of different sensors that are being used collect the combustion characteristics of different biodiesel formulations. This project is currently being used by other graduates in order to complete their projects for subsequent publication. For the Reformate Assisted Biodiesel Combustion architecture, the author developed a reformate injection system to test different hydrogen and carbon monoxide mixtures as combustion augmentation. Hydrogen combustion has certain limiting factors, such as pre-ignition in spark ignition engines and inability to work as a singular fuel in compression ignition engines. To offset these issues, a dual-fuel methodology is utilized by injecting a hydrogen/carbon monoxide mixture into the intake stream of a diesel engine operating on biodiesel. While carbon monoxide does degrade some of the desirable properties of hydrogen, it acts partially like a diluent in order to prevent pre-ignition from occurring. The result of this mixture addition allows the engine to maintain power while reducing biodiesel fuel consumption with a minimal NOx emissions increase.

  15. View generated database

    NASA Technical Reports Server (NTRS)

    Downward, James G.

    1992-01-01

    This document represents the final report for the View Generated Database (VGD) project, NAS7-1066. It documents the work done on the project up to the point at which all project work was terminated due to lack of project funds. The VGD was to provide the capability to accurately represent any real-world object or scene as a computer model. Such models include both an accurate spatial/geometric representation of surfaces of the object or scene, as well as any surface detail present on the object. Applications of such models are numerous, including acquisition and maintenance of work models for tele-autonomous systems, generation of accurate 3-D geometric/photometric models for various 3-D vision systems, and graphical models for realistic rendering of 3-D scenes via computer graphics.

  16. 75 FR 19167 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-41; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ...; Introduction; FAR Case 2009-005, Use of Project Labor Agreements for Federal Construction Projects; Federal...; Introduction AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and National...

  17. Federal Motor Carrier Safety Administration’s advanced system testing utilizing a data acquisition system on the highways (FAST DASH) safety technology evaluation project #3 : novel convex mirrors.

    DOT National Transportation Integrated Search

    2016-11-01

    An independent evaluation of a set of novel prototype mirrors was conducted to determine whether the mirrors perform as well as traditional production mirrors across the basic functions of field of view (FOV), image distortion, and distance estimatio...

  18. Research and Development Project Summaries, October 1991

    DTIC Science & Technology

    1991-10-01

    delivery methods, training cost reduction, demonstration of technology’ effectiveness, and the reduction of acquisition risk . The majority of the work...demonstrations, risk reduction developments, and cost-effectiveness investigations in simulator and training technologzv. This advanced development program is a...systems. The program is organized around specific demonstration tasks that target critical technical risks that confront future weapons system

  19. HALOE test and evaluation software

    NASA Technical Reports Server (NTRS)

    Edmonds, W.; Natarajan, S.

    1987-01-01

    Computer programming, system development and analysis efforts during this contract were carried out in support of the Halogen Occultation Experiment (HALOE) at NASA/Langley. Support in the major areas of data acquisition and monitoring, data reduction and system development are described along with a brief explanation of the HALOE project. Documented listings of major software are located in the appendix.

  20. A Knowledge-based Multimedia System to Support the Teaching and Learning of Chinese Characters.

    ERIC Educational Resources Information Center

    Ki, W.; And Others

    A current project is underway to develop a multimedia system that would support the teaching and learning of Chinese characters, as well as provide a platform for conducting research into the cognitive aspects of Chinese language acquisition. Although the number of commonly used Chinese characters amounts to thousands, there are many structural…

  1. Connected commercial vehicles — retrofit safety device kit project : data acquisition system (DAS) documentation.

    DOT National Transportation Integrated Search

    2014-03-01

    Connected vehicle wireless data communications can enable safety applications that may reduce injuries and fatalities. Cooperative vehicle-to-vehicle (V2V) safety applications will be effective only if a high fraction of vehicles are equipped. Deploy...

  2. LIFE CYCLE DESIGN FRAMEWORK AND DEMONSTRATION PROJECTS - PROFILES OF AT&T AND ALLIED SIGNAL

    EPA Science Inventory

    This document offers guidance and practical experience for integrating environmental considerations into product system development. Life cycle design seeks to minimize the environmental burden associated with a product's life cycle from raw materials acquisition through manufact...

  3. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  4. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  5. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  6. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  7. 48 CFR 342.7101-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 342.7101-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT... information that a contractor's accumulated cost and projected expenditures will exceed the limit of funds... receives information from a source other than the contractor that a cost overrun is anticipated, the...

  8. Robotic acquisition programs: technical and performance challenges

    NASA Astrophysics Data System (ADS)

    Thibadoux, Steven A.

    2002-07-01

    The Unmanned Ground Vehicles/ Systems Joint Project Office (UGV/S JPO) is developing and fielding a variety of tactical robotic systems for the Army and Marine Corps. The Standardized Robotic System (SRS) provides a family of common components that can be installed in existing military vehicles, to allow unmanned operation of the vehicle and its payloads. The Robotic Combat Support System (RCSS) will be a medium sized unmanned system with interchangeable attachments, allowing a remote operator to perform a variety of engineering tasks. The Gladiator Program is a USMC initiative for a small to medium sized, highly mobile UGV to conduct scout/ surveillance missions and to carry various lethal and non-lethal payloads. Acquisition plans for these programs require preplanned evolutionary block upgrades to add operational capability, as new technology becomes available. This paper discusses technical and performance issues that must be resolved and the enabling technologies needed for near term block upgrades of these first generation robotic systems. Additionally, two Joint Robotics Program (JRP) initiatives, Robotic Acquisition through Virtual Environments and Networked Simulations (RAVENS) and Joint Architecture for Unmanned Ground Systems (JAUGS), will be discussed. RAVENS and JAUGS will be used to efficiently evaluate and integrate new technologies to be incorporated in system upgrades.

  9. Spectral Dynamics Inc., ships hybrid, 316-channel data acquisition system to Sandia Labs.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Douglas

    2003-09-01

    Spectral Dynamics announced the shipment of a 316-channel data acquisition system. The system was custom designed for the Light Initiated High Explosive (LIHE) facility at Sandia Labs in Albuquerque, New Mexico by Spectral Dynamics Advanced Research Products Group. This Spectral Dynamics data acquisition system was tailored to meet the unique LIHE environmental and testing requirements utilizing Spectral Dynamics commercial off the shelf (COTS) Jaguar and VIDAS products supplemented by SD Alliance partner's (COTS) products. 'This system is just the beginning of our cutting edge merged technology solutions,' stated Mark Remelman, Manager for the Spectral Dynamics Advanced Research Products Group. 'Thismore » Hybrid system has 316-channels of data acquisition capability, comprised of 102.4kHz direct to disk acquisition and 2.5MHz, 200Mhz & 500Mhz RAM based capabilities. In addition it incorporates the advanced bridge conditioning and dynamic configuration capabilities offered by Spectral Dynamics new Smart Interface Panel System (SIPS{trademark}).' After acceptance testing, Tony King, the Instrumentation Engineer facilitating the project for the Sandia LIHE group commented; 'The LIHE staff was very impressed with the design, construction, attention to detail and overall performance of the instrumentation system'. This system combines VIDAS, a leading edge fourth generation SD-VXI hardware and field-proven software system from SD's Advanced Research Products Group with SD's Jaguar, a multiple Acquisition Control Peripheral (ACP) system that allows expansion to hundreds of channels without sacrificing signal processing performance. Jaguar incorporates dedicated throughput disks for each ACP providing time streaming to disk at up to the maximum sample rate. Spectral Dynamics, Inc. is a leading worldwide supplier of systems and software for advanced computer-automated data acquisition, vibration testing, structural dynamics, explosive shock, high-speed transient capture, acoustic analysis, monitoring, measurement, control and backup. Spectral Dynamics products are used for research, design verification, product testing and process improvement by manufacturers of all types of electrical, electronic and mechanical products, as well as by universities and government-funded agencies. The Advanced Research Products Group is the newest addition to the Spectral Dynamics family. Their newest VXI data acquisition hardware pushes the envelope on capabilities and embodies the same rock solid design methodologies, which have always differentiated Spectral Dynamics from its competition.« less

  10. Air Force Technical Objective Document FY 87

    DTIC Science & Technology

    1985-12-01

    Air Force Systems Command Edwards Air Force Base. Cal ifornia 93523-5000 NOTICES THIS DOCUMENT IS FOR INFORMATION AND GUIDANCE ONL Y This...acquisition of Air Foree weapon systems . Each Air Foree laboratory annually formulates Q Research and Technology (R& T) Pion in response to available...guidance based on USAF requirements, the identification of scientific and technological opportunities, and the needs of present and projected systems

  11. Huntington's Disease Research Roster Support with a Microcomputer Database Management System

    PubMed Central

    Gersting, J. M.; Conneally, P. M.; Beidelman, K.

    1983-01-01

    This paper chronicles the MEGADATS (Medical Genetics Acquisition and DAta Transfer System) database development effort in collecting, storing, retrieving, and plotting human family pedigrees. The newest system, MEGADATS-3M, is detailed. Emphasis is on the microcomputer version of MEGADATS-3M and its use to support the Huntington's Disease research roster project. Examples of data input and pedigree plotting are included.

  12. Shifts in nitrogen acquisition strategies enable enhanced terrestrial carbon storage under elevated CO2 in a global model

    NASA Astrophysics Data System (ADS)

    Sulman, B. N.; Brzostek, E. R.; Menge, D.; Malyshev, S.; Shevliakova, E.

    2017-12-01

    Earth System Model (ESM) projections of terrestrial carbon (C) uptake are critical to understanding the future of the global C cycle. Current ESMs include intricate representations of photosynthetic C fixation in plants, allowing them to simulate the stimulatory effect of increasing atmospheric CO2 levels on photosynthesis. However, they lack sophisticated representations of plant nutrient acquisition, calling into question their ability to project the future land C sink. We conducted simulations using a new model of terrestrial C and nitrogen (N) cycling within the Geophysical Fluid Dynamics Laboratory (GFDL) global land model LM4 that uses a return on investment framework to simulate global patterns of N acquisition via fixation of N2 from the atmosphere, scavenging of inorganic N from soil solution, and mining of organic N from soil organic matter (SOM). We show that these strategies drive divergent C cycle responses to elevated CO2 at the ecosystem scale, with the scavenging strategy leading to N limitation of plant growth and the mining strategy facilitating stimulation of plant biomass accumulation over decadal time scales. In global simulations, shifts in N acquisition from inorganic N scavenging to organic N mining along with increases in N fixation supported long-term acceleration of C uptake under elevated CO2. Our results indicate that the ability of the land C sink to mitigate atmospheric CO2 levels is tightly coupled to the functional diversity of ecosystems and their capacity to change their N acquisition strategies over time. Incorporation of these mechanisms into ESMs is necessary to improve confidence in model projections of the global C cycle.

  13. The Data Acquisition System of the Stockholm Educational Air Shower Array

    NASA Astrophysics Data System (ADS)

    Hofverberg, P.; Johansson, H.; Pearce, M.; Rydstrom, S.; Wikstrom, C.

    2005-12-01

    The Stockholm Educational Air Shower Array (SEASA) project is deploying an array of plastic scintillator detector stations on school roofs in the Stockholm area. Signals from GPS satellites are used to time synchronise signals from the widely separated detector stations, allowing cosmic ray air showers to be identified and studied. A low-cost and highly scalable data acquisition system has been produced using embedded Linux processors which communicate station data to a central server running a MySQL database. Air shower data can be visualised in real-time using a Java-applet client. It is also possible to query the database and manage detector stations from the client. In this paper, the design and performance of the system are described

  14. MSL's Widgets: Adding Rebustness to Martian Sample Acquisition, Handling, and Processing

    NASA Technical Reports Server (NTRS)

    Roumeliotis, Chris; Kennedy, Brett; Lin, Justin; DeGrosse, Patrick; Cady, Ian; Onufer, Nicholas; Sigel, Deborah; Jandura, Louise; Anderson, Robert; Katz, Ira; hide

    2013-01-01

    Mars Science Laboratory's (MSL) Sample Acquisition Sample Processing and Handling (SA-SPaH) system is one of the most ambitious terrain interaction and manipulation systems ever built and successfully used outside of planet earth. Mars has a ruthless environment that has surprised many who have tried to explore there. The robustness widget program was implemented by the MSL project to help ensure the SA-SPaH system would be robust enough to the surprises of this ruthless Martian environment. The robustness widget program was an effort of extreme schedule pressure and responsibility, but was accomplished with resounding success. This paper will focus on a behind the scenes look at MSL's robustness widgets: the particle fun zone, the wind guards, and the portioner pokers.

  15. Case Study of the Space Shuttle Cockpit Avionics Upgrade Software

    NASA Technical Reports Server (NTRS)

    Ferguson, Roscoe C.; Thompson, Hiram C.

    2005-01-01

    The purpose of the Space Shuttle Cockpit Avionics Upgrade project was to reduce crew workload and improve situational awareness. The upgrade was to augment the Shuttle avionics system with new hardware and software. An early version of this system was used to gather human factor statistics in the Space Shuttle Motion Simulator of the Johnson Space Center for one month by multiple teams of astronauts. The results were compiled by NASA Ames Research Center and it was was determined that the system provided a better than expected increase in situational awareness and reduction in crew workload. Even with all of the benefits nf the system, NASA cancelled the project towards the end of the development cycle. A major success of this project was the validation of the hardware architecture and software design. This was significant because the project incorporated new technology and approaches for the development of human rated space software. This paper serves as a case study to document knowledge gained and techniques that can be applied for future space avionics development efforts. The major technological advances were the use of reflective memory concepts for data acquisition and the incorporation of Commercial off the Shelf (COTS) products in a human rated space avionics system. The infused COTS products included a real time operating system, a resident linker and loader, a display generation tool set, and a network data manager. Some of the successful design concepts were the engineering of identical outputs in multiple avionics boxes using an event driven approach and inter-computer communication, a reconfigurable data acquisition engine, the use of a dynamic bus bandwidth allocation algorithm. Other significant experiences captured were the use of prototyping to reduce risk, and the correct balance between Object Oriented and Functional based programming.

  16. 48 CFR 307.104-70 - Acquisition strategy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Enterprise Performance Life Cycle concept phase. .... Program and Project Managers responsible for major IT capital investments (and for any other investments... ASFR/OGAPA/DA Internet Web site. Program and Project Managers must initiate the acquisition strategy...

  17. Acquisition system for the "EMSO Generic Instrument Module" (EGIM) and analysis of the data obtained during its first deployment at OBSEA site (Spain)

    NASA Astrophysics Data System (ADS)

    Garcia, Oscar; Mihai Toma, Daniel; Dañobeitia, Juanjo; del Rio, Joaquin; Bartolome, Rafael; Martínez, Enoc; Nogueras, Marc; Bghiel, Ikram; Lanteri, Nadine; Rolin, Jean Francois; Beranzoli, Laura; Favali, Paolo

    2017-04-01

    The EMSODEV project (EMSO implementation and operation: DEVelopment of instrument module) is an Horizon-2020 UE project whose overall objective is the operation of eleven seafloor observatories and four test sites. These infrastructures are distributed throughout European seas, from the Arctic across the Atlantic and the Mediterranean to the Black Sea, and are managed by the European consortium EMSO-ERIC (European Research Infrastructure Consortium) with the participation of 8 European countries and other associated partners. Recently, we have implemented a Generic Sensor Module (EGIM) within the EMSO-ERIC distributed marine research infrastructure. EGIM is able to operate on any EMSO observatory node, mooring line, seabed station, cabled or non-cabled and surface buoy. The main role of EGIM is to measure homogeneously a set of core variables using the same hardware, sensor references, qualification methods, calibration methods, data format and access, maintenance procedures in several European ocean locations. The EGIM module acquires a wide range of ocean parameters in a long-term consistent, accurate and comparable manner from disciplines such as biology, geology, chemistry, physics, engineering, and computer science, from polar to subtropical environments, through the water column down to the deep sea. Our work includes developing standard-compliant generic software for Sensor Web Enablement (SWE) on EGIM and to perform the first onshore and offshore test bench, to support the sensors data acquisition on a new interoperable EGIM system. EGIM in its turn is linked to an acquisition drives processes, a centralized Sensor Observation Service (SOS) server and a laboratory monitor system (LabMonitor) that records events and alarms during acquisition. The measurements recorded along EMSO NODES are essential to accurately respond to the social and scientific challenges such as climate change, changes in marine ecosystems, and marine hazards. This presentation shows the first EGIM deployment and the SWE infrastructure, developed to manage the data acquisition from the underwater sensors and their insertion to the SOS interface.

  18. Acquisition of Learning by Facilitating Academics (Project ALFA). Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Augustin, Marc

    The Acquisition of Learning by Facilitating Academics (Project ALFA) was an Elementary and Secondary Education Act Title VII-funded project in its second year in 1993-94. The project operated at a high school in Brooklyn, and served 75 Haitian-speaking students of limited English proficiency with fewer than 5 years in an English-speaking school.…

  19. Mars @ ASDC

    NASA Astrophysics Data System (ADS)

    Carraro, Francesco

    "Mars @ ASDC" is a project born with the goal of using the new web technologies to assist researches involved in the study of Mars. This project employs Mars map and javascript APIs provided by Google to visualize data acquired by space missions on the planet. So far, visualization of tracks acquired by MARSIS and regions observed by VIRTIS-Rosetta has been implemented. The main reason for the creation of this kind of tool is the difficulty in handling hundreds or thousands of acquisitions, like the ones from MARSIS, and the consequent difficulty in finding observations related to a particular region. This led to the development of a tool which allows to search for acquisitions either by defining the region of interest through a set of geometrical parameters or by manually selecting the region on the map through a few mouse clicks The system allows the visualization of tracks (acquired by MARSIS) or regions (acquired by VIRTIS-Rosetta) which intersect the user defined region. MARSIS tracks can be visualized both in Mercator and polar projections while the regions observed by VIRTIS can presently be visualized only in Mercator projection. The Mercator projection is the standard map provided by Google. The polar projections are provided by NASA and have been developed to be used in combination with APIs provided by Google The whole project has been developed following the "open source" philosophy: the client-side code which handles the functioning of the web page is written in javascript; the server-side code which executes the searches for tracks or regions is written in PHP and the DB which undergoes the system is MySQL.

  20. Autonomous Navigation Improvements for High-Earth Orbiters Using GPS

    NASA Technical Reports Server (NTRS)

    Long, Anne; Kelbel, David; Lee, Taesul; Garrison, James; Carpenter, J. Russell; Bauer, F. (Technical Monitor)

    2000-01-01

    The Goddard Space Flight Center is currently developing autonomous navigation systems for satellites in high-Earth orbits where acquisition of the GPS signals is severely limited This paper discusses autonomous navigation improvements for high-Earth orbiters and assesses projected navigation performance for these satellites using Global Positioning System (GPS) Standard Positioning Service (SPS) measurements. Navigation performance is evaluated as a function of signal acquisition threshold, measurement errors, and dynamic modeling errors using realistic GPS signal strength and user antenna models. These analyses indicate that an autonomous navigation position accuracy of better than 30 meters root-mean-square (RMS) can be achieved for high-Earth orbiting satellites using a GPS receiver with a very stable oscillator. This accuracy improves to better than 15 meters RMS if the GPS receiver's signal acquisition threshold can be reduced by 5 dB-Hertz to track weaker signals.

  1. Non-destructive sampling of a comet

    NASA Astrophysics Data System (ADS)

    Jessberger, H. L.; Kotthaus, M.

    1991-04-01

    Various conditions which must be met for the development of a nondestructive sampling and acquisition system are outlined and the development of a new robotic sampling system suited for use on a cometary surface is briefly discussed. The Rosetta mission of ESA will take samples of a comet nucleus and return both core and volatile samples to earth. Various considerations which must be taken into account for such a project are examined including the identification of design parameters for sample quality; the identification of the most probable site conditions; the development of a sample acquisition system with respect to these conditions; the production of model materials and model conditions; and the investigation of the relevant material properties. An adequate sampling system should also be designed and built, including various tools, and the system should be tested under simulated cometary conditions.

  2. An image‐based method to synchronize cone‐beam CT and optical surface tracking

    PubMed Central

    Schaerer, Joël; Riboldi, Marco; Sarrut, David; Baroni, Guido

    2015-01-01

    The integration of in‐room X‐ray imaging and optical surface tracking has gained increasing importance in the field of image guided radiotherapy (IGRT). An essential step for this integration consists of temporally synchronizing the acquisition of X‐ray projections and surface data. We present an image‐based method for the synchronization of cone‐beam computed tomography (CBCT) and optical surface systems, which does not require the use of additional hardware. The method is based on optically tracking the motion of a component of the CBCT/gantry unit, which rotates during the acquisition of the CBCT scan. A calibration procedure was implemented to relate the position of the rotating component identified by the optical system with the time elapsed since the beginning of the CBCT scan, thus obtaining the temporal correspondence between the acquisition of X‐ray projections and surface data. The accuracy of the proposed synchronization method was evaluated on a motorized moving phantom, performing eight simultaneous acquisitions with an Elekta Synergy CBCT machine and the AlignRT optical device. The median time difference between the sinusoidal peaks of phantom motion signals extracted from the synchronized CBCT and AlignRT systems ranged between ‐3.1 and 12.9 msec, with a maximum interquartile range of 14.4 msec. The method was also applied to clinical data acquired from seven lung cancer patients, demonstrating the potential of the proposed approach in estimating the individual and daily variations in respiratory parameters and motion correlation of internal and external structures. The presented synchronization method can be particularly useful for tumor tracking applications in extracranial radiation treatments, especially in the field of patient‐specific breathing models, based on the correlation between internal tumor motion and external surface surrogates. PACS number: 87

  3. 23 CFR 710.501 - Early acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Early acquisition. 710.501 Section 710.501 Highways... REAL ESTATE Property Acquisition Alternatives § 710.501 Early acquisition. (a) Real property... so based on program or project considerations. The State may undertake early acquisition for corridor...

  4. 23 CFR 710.501 - Early acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Early acquisition. 710.501 Section 710.501 Highways... REAL ESTATE Property Acquisition Alternatives § 710.501 Early acquisition. (a) Real property... so based on program or project considerations. The State may undertake early acquisition for corridor...

  5. 48 CFR 1334.201-70 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... criticality, or risk potential. (b) If a project manager considers the use of an EVMS to be necessary for a... the Department's Information Technology Investment Performance Measurement and Performance Reporting Policy, the use of an Earned Value Management System (EVMS) is required for major acquisitions for...

  6. National Ignition Facility project acquisition plan revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clobes, A.R.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  7. Field data acquisition technologies for Iowa transportation agencies.

    DOT National Transportation Integrated Search

    1994-08-01

    This report describes the results of the research project investigating the use of : advanced field data acquisition technologies for lowa transponation agencies. The : objectives of the research project were to (1) research and evaluate current data...

  8. Development of the Cassini Ground Data System in a multimission environment

    NASA Technical Reports Server (NTRS)

    Madrid, G.; Wanczuk, G.

    1993-01-01

    As baselined, the Cassini Ground Data System (GDS) will be composed of Project specific and multimission elements. The former will be developed by the Cassini Project and the latter by two JPL institutional organizations, the Telecommunications and Data Acquisition Office (TDA) and the Multimission Operations Systems Office (MOSO). The GDS will be developed in three principal phases: Spacecraft Test, Launch-cruise, and Science Tour, with a significant part of the development deferred until the post-launch period. New capabilities are being introduced that are key to the achievement of more cost effective operations. Successful development of the system will require careful planning and will involve participation of diverse disciplines. This paper introduces the Cassini Project from the Ground Data System perspective and discusses development approaches expected to produce systems which meet functional and performance requirements and which will be delivered on schedule and within budget.

  9. Development of a cloud-based system for remote monitoring of a PVT panel

    NASA Astrophysics Data System (ADS)

    Saraiva, Luis; Alcaso, Adérito; Vieira, Paulo; Ramos, Carlos Figueiredo; Cardoso, Antonio Marques

    2016-10-01

    The paper presents a monitoring system developed for an energy conversion system based on the sun and known as thermophotovoltaic panel (PVT). The project was implemented using two embedded microcontrollers platforms (arduino Leonardo and arduino yún), wireless transmission systems (WI-FI and XBEE) and net computing ,commonly known as cloud (Google cloud). The main objective of the project is to provide remote access and real-time data monitoring (like: electrical current, electrical voltage, input fluid temperature, output fluid temperature, backward fluid temperature, up PV glass temperature, down PV glass temperature, ambient temperature, solar radiation, wind speed, wind direction and fluid mass flow). This project demonstrates the feasibility of using inexpensive microcontroller's platforms and free internet service in theWeb, to support the remote study of renewable energy systems, eliminating the acquisition of dedicated systems typically more expensive and limited in the kind of processing proposed.

  10. The Evolution of a Science Project: A Preliminary System Dynamics Model of a Recurring Software-Reliant Acquisition Behavior

    DTIC Science & Technology

    2012-07-01

    3.3.4 User Community Management 14 3.3.5 Uncontrolled Prototype Growth 14 3.3.6 Project Manager Decisions 15 3.3.7 The 90% Syndrome 15 3.3.8 Re...Figure 3: 90% Syndrome Due to Rippling Rework in the Production Development 21 Figure 4: Causal Loop Diagram of "The Evolution of a Science Project...Unintended Burnout Due to Overtime 60 V | CMU/SEI-2012-TR-001 Acknowledgments Many people have worked to sponsor and improve this report and the

  11. Alabama Institute for Deaf and Blind Biodiesel Project Green

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Edmiston, Jessica L

    2012-09-28

    Through extensive collaboration, Alabama Institute for Deaf and Blind (AIDB) is Alabama's first educational entity to initiate a biodiesel public education, student training and production program, Project Green. With state and national replication potential, Project Green benefits local businesses and city infrastructures within a 120-mile radius; provides alternative education to Alabama school systems and to schools for the deaf and blind in Appalachian States; trains students with sensory and/or multiple disabilities in the acquisition and production of biodiesel; and educates the external public on alternative fuels benefits.

  12. The BBN (Bolt Beranek and Newman) Knowledge Acquisition Project. Phase 1. Functional Description; Test Plan.

    DTIC Science & Technology

    1987-05-01

    Computers . " Symbolics. Inc. 8. Carnegie Group. Inc KnoiledgeCraft Carnegie Group, Inc.. 1985. .- 9. Moser, Margaret, An Overviev of NIKL. Section of BBN...ORGANIZATION NAME AND ADDRESS I0. PROGRAM ELEMENT. PROJECT. TASK BBN Laboratories Inc. AREAAWoRIUNTNUMER_ 10 Moulton St. Cambridge, MA 02238 It...knowledge representation, expert systems; strategic computing , . A 20 ABSTRACT (Contnue an r rerse ide If neceaesary and Identify by block number) This

  13. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2006-02-28

    NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional...Systems ( NGSS ) division. The Navy has not procured any frigates since FY1984, when the last FFG-7 was procured. 20 In earlier years, some Navy surface...Defense for Acquisition, Technology, and Logistics (USD AT&L) in February 2004, the first DD(X) would be built by NGSS , the second DD(X) would be built GD

  14. Real-time acquisition and display of flow contrast using speckle variance optical coherence tomography in a graphics processing unit.

    PubMed

    Xu, Jing; Wong, Kevin; Jian, Yifan; Sarunic, Marinko V

    2014-02-01

    In this report, we describe a graphics processing unit (GPU)-accelerated processing platform for real-time acquisition and display of flow contrast images with Fourier domain optical coherence tomography (FDOCT) in mouse and human eyes in vivo. Motion contrast from blood flow is processed using the speckle variance OCT (svOCT) technique, which relies on the acquisition of multiple B-scan frames at the same location and tracking the change of the speckle pattern. Real-time mouse and human retinal imaging using two different custom-built OCT systems with processing and display performed on GPU are presented with an in-depth analysis of performance metrics. The display output included structural OCT data, en face projections of the intensity data, and the svOCT en face projections of retinal microvasculature; these results compare projections with and without speckle variance in the different retinal layers to reveal significant contrast improvements. As a demonstration, videos of real-time svOCT for in vivo human and mouse retinal imaging are included in our results. The capability of performing real-time svOCT imaging of the retinal vasculature may be a useful tool in a clinical environment for monitoring disease-related pathological changes in the microcirculation such as diabetic retinopathy.

  15. Optimization of image quality and acquisition time for lab-based X-ray microtomography using an iterative reconstruction algorithm

    NASA Astrophysics Data System (ADS)

    Lin, Qingyang; Andrew, Matthew; Thompson, William; Blunt, Martin J.; Bijeljic, Branko

    2018-05-01

    Non-invasive laboratory-based X-ray microtomography has been widely applied in many industrial and research disciplines. However, the main barrier to the use of laboratory systems compared to a synchrotron beamline is its much longer image acquisition time (hours per scan compared to seconds to minutes at a synchrotron), which results in limited application for dynamic in situ processes. Therefore, the majority of existing laboratory X-ray microtomography is limited to static imaging; relatively fast imaging (tens of minutes per scan) can only be achieved by sacrificing imaging quality, e.g. reducing exposure time or number of projections. To alleviate this barrier, we introduce an optimized implementation of a well-known iterative reconstruction algorithm that allows users to reconstruct tomographic images with reasonable image quality, but requires lower X-ray signal counts and fewer projections than conventional methods. Quantitative analysis and comparison between the iterative and the conventional filtered back-projection reconstruction algorithm was performed using a sandstone rock sample with and without liquid phases in the pore space. Overall, by implementing the iterative reconstruction algorithm, the required image acquisition time for samples such as this, with sparse object structure, can be reduced by a factor of up to 4 without measurable loss of sharpness or signal to noise ratio.

  16. Colville Confederated Tribes' Performance Project Wildlife Mitigation Acquisitions, Annual Report 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitney, Richard; Berger, Matthew; Tonasket, Patrick

    2006-12-01

    The Colville Confederated Tribes Wildlife Mitigation Project is protecting lands as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. The Mitigation Project protects and manages 54,606 acres for the biological requirements of managed wildlife species that are important to the Colville Tribes. With the inclusion of 2006 acquisitions, the Colville Tribes have acquired approximately 32,018 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. This annual report for 2006 briefly describes that four priority land acquisitions that were considered for enrollment into the Colvillemore » Tribes Mitigation Project during the 2006 contract period.« less

  17. 77 FR 60281 - Regarding the Acquisition of Four U.S. Wind Farm Project Companies by Ralls Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Acquisition of Four U.S. Wind Farm Project Companies by Ralls Corporation By the authority vested in me as... Pine City Windfarm, LLC (collectively, the Project Companies), all limited liability companies... Powers Act (50 U.S.C. 1701 et seq.), do not, in my judgment, provide adequate and appropriate authority...

  18. Tactical EO/IE System for Ground Forces

    DTIC Science & Technology

    1990-09-01

    this thesis is based on these ideas. We will give the guidelines to a project manager or to a beginner in EW research about EO/IR system acquisition...1982 Syria vs Israel Syria: 1 Syria 5+ By Syria: 89 by 96+ Sparrow AIM-9G/L PYTHON Korea: 1 B- Kamchatka 1983 Korea vs USSR 0 0 747(KAL-(07) by AA-3 or

  19. The New Generation Russian VLBI Network

    NASA Technical Reports Server (NTRS)

    Finkelstein, Andrey; Ipatov, Alexander; Smolentsev, Sergey; Mardyshkin, Vyacheslav; Fedotov, Leonid; Surkis, Igor; Ivanov, Dmitrij; Gayazov, Iskander

    2010-01-01

    This paper deals with a new project of the Russian VLBI Network dedicated for Universal Time determinations in quasi on-line mode. The basic principles of the network design and location of antennas are explained. Variants of constructing receiving devices, digital data acquisition system, and phase calibration system are specially considered. The frequency ranges and expected values of noise temperature are given.

  20. A Library Service Center for Suburban Maryland County Library Systems, Anne Arundel, Baltimore, Montgomery, Prince George's; An Establishment Proposal.

    ERIC Educational Resources Information Center

    Duchac, Kenneth F.

    Based on a year of inquiry and consultation, this report of the Suburban Maryland Project confirms the feasibility of cooperative technical service functions for the four public library systems of suburban Maryland. It is recommended that the proposed Library Service Center be assigned the ordering, acquisition, cataloging, preparation for book…

  1. Systems Engineering of Unmanned DoD Systems: Following the Joint Capabilities Integration and Development System/Defense Acquisition System Process to Develop an Unmanned Ground Vehicle System

    DTIC Science & Technology

    2015-12-01

    Manual D-A-1). APAs are “Performance attributes of a system not important enough to be considered KPPs or KSAs, but still appropriate to include in...the CDD or CPD are designated as APAs ” (JCIDS Manual D-A-1). The requirements are expressed using Thresholds (T) and Objectives (O). “Performance...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT Approved for public release; distribution is

  2. Mobility aid for the blind

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A project to develop an effective mobility aid for blind pedestrians which acquires consecutive images of the scenes before a moving pedestrian, which locates and identifies the pedestrian's path and potential obstacles in the path, which presents path and obstacle information to the pedestrian, and which operates in real-time is discussed. The mobility aid has three principal components: an image acquisition system, an image interpretation system, and an information presentation system. The image acquisition system consists of a miniature, solid-state TV camera which transforms the scene before the blind pedestrian into an image which can be received by the image interpretation system. The image interpretation system is implemented on a microprocessor which has been programmed to execute real-time feature extraction and scene analysis algorithms for locating and identifying the pedestrian's path and potential obstacles. Identity and location information is presented to the pedestrian by means of tactile coding and machine-generated speech.

  3. Status of the Body of Knowledge and Curriculum to Advance Systems Engineering (BKCASE (trademark)) Project

    DTIC Science & Technology

    2011-10-01

    Systems engineer- ing knowledge has also been documented through the standards bodies, most notably : • ISO /IEC/IEEE 15288, Systems Engineer- ing...System Life Cycle Processes, 2008 (see [10]). • ANSI/EIA 632, Processes for Engineering a System, (1998) • IEEE 1220, ISO /IEC 26702 Application...tion • United States Defense Acquisition Guidebook, Chapter 4, June 27, 2011 • IEEE/EIA 12207 , Software Life Cycle Processes, 2008 • United

  4. Study on the Future Internet System through Analysis of SCADA Systems

    NASA Astrophysics Data System (ADS)

    Song, Jae-Gu; Jung, Sungmo; Kim, Seoksoo

    Research on the future Internet is focused on establishing standards by solving problems through various projects and accepting various requirements. In this study, the SCADA (Supervisory Control And Data Acquisition) environment, closely related with national infrastructure, is analyzed in order to explore requirements of the future Internet and then those of the SCADA network. Also, this study provides SCADA system environments for the future Internet.

  5. Developing Systems Engineering Experience Accelerator (SEEA) Prototype and Roadmap -- Increment 4

    DTIC Science & Technology

    2017-08-08

    of an acquisition program, two categories of new capabilities were added to the UAV experience. Based on a student project at Stevens Institute of...program for a new unmanned aerial vehicle (UAV) system. It was based on the concept of the learners assuming this role shortly after preliminary...University curriculum for systems engineers. First, several new capabilities have been added. These include a trade study for additional technical

  6. Development of an MR-compatible SPECT system (MRSPECT) for simultaneous data acquisition.

    PubMed

    Hamamura, Mark J; Ha, Seunghoon; Roeck, Werner W; Muftuler, L Tugan; Wagenaar, Douglas J; Meier, Dirk; Patt, Bradley E; Nalcioglu, Orhan

    2010-03-21

    In medical imaging, single-photon emission computed tomography (SPECT) can provide specific functional information while magnetic resonance imaging (MRI) can provide high spatial resolution anatomical information as well as complementary functional information. In this study, we developed a miniaturized dual-modality SPECT/MRI (MRSPECT) system and demonstrated the feasibility of simultaneous SPECT and MRI data acquisition, with the possibility of whole-body MRSPECT systems through suitable scaling of components. For our MRSPECT system, a cadmium-zinc-telluride (CZT) nuclear radiation detector was interfaced with a specialized radiofrequency (RF) coil and placed within a whole-body 4 T MRI system. Various phantom experiments characterized the interaction between the SPECT and MRI hardware components. The metallic components of the SPECT hardware altered the B(0) field and generated a non-uniform reduction in the signal-to-noise ratio (SNR) of the MR images. The presence of a magnetic field generated a position shift and resolution loss in the nuclear projection data. Various techniques were proposed to compensate for these adverse effects. Overall, our results demonstrate that accurate, simultaneous SPECT and MRI data acquisition is feasible, justifying the further development of MRSPECT for either small-animal imaging or whole-body human systems by using appropriate components.

  7. Development of an MR-compatible SPECT system (MRSPECT) for simultaneous data acquisition

    NASA Astrophysics Data System (ADS)

    Hamamura, Mark J.; Ha, Seunghoon; Roeck, Werner W.; Tugan Muftuler, L.; Wagenaar, Douglas J.; Meier, Dirk; Patt, Bradley E.; Nalcioglu, Orhan

    2010-03-01

    In medical imaging, single-photon emission computed tomography (SPECT) can provide specific functional information while magnetic resonance imaging (MRI) can provide high spatial resolution anatomical information as well as complementary functional information. In this study, we developed a miniaturized dual-modality SPECT/MRI (MRSPECT) system and demonstrated the feasibility of simultaneous SPECT and MRI data acquisition, with the possibility of whole-body MRSPECT systems through suitable scaling of components. For our MRSPECT system, a cadmium-zinc-telluride (CZT) nuclear radiation detector was interfaced with a specialized radiofrequency (RF) coil and placed within a whole-body 4 T MRI system. Various phantom experiments characterized the interaction between the SPECT and MRI hardware components. The metallic components of the SPECT hardware altered the B0 field and generated a non-uniform reduction in the signal-to-noise ratio (SNR) of the MR images. The presence of a magnetic field generated a position shift and resolution loss in the nuclear projection data. Various techniques were proposed to compensate for these adverse effects. Overall, our results demonstrate that accurate, simultaneous SPECT and MRI data acquisition is feasible, justifying the further development of MRSPECT for either small-animal imaging or whole-body human systems by using appropriate components.

  8. The LUX experiment - trigger and data acquisition systems

    NASA Astrophysics Data System (ADS)

    Druszkiewicz, Eryk

    2013-04-01

    The Large Underground Xenon (LUX) detector is a two-phase xenon time projection chamber designed to detect interactions of dark matter particles with the xenon nuclei. Signals from the detector PMTs are processed by custom-built analog electronics which provide properly shaped signals for the trigger and data acquisition (DAQ) systems. During calibrations, both systems must be able to handle high rates and have large dynamic ranges; during dark matter searches, maximum sensitivity requires low thresholds. The trigger system uses eight-channel 64-MHz digitizers (DDC-8) connected to a Trigger Builder (TB). The FPGA cores on the digitizers perform real-time pulse identification (discriminating between S1 and S2-like signals) and event localization. The TB uses hit patterns, hit maps, and maximum response detection to make trigger decisions, which are reached within few microseconds after the occurrence of an event of interest. The DAQ system is comprised of commercial digitizers with customized firmware. Its real-time baseline suppression allows for a maximum event acquisition rate in excess of 1.5 kHz, which results in virtually no deadtime. The performance of the trigger and DAQ systems during the commissioning runs of LUX will be discussed.

  9. An integrated information system for the acquisition, management and sharing of environmental data aimed to decision making

    NASA Astrophysics Data System (ADS)

    La Loggia, Goffredo; Arnone, Elisa; Ciraolo, Giuseppe; Maltese, Antonino; Noto, Leonardo; Pernice, Umberto

    2012-09-01

    This paper reports the first results of the Project SESAMO - SistEma informativo integrato per l'acquisizione, geStione e condivisione di dati AMbientali per il supportO alle decisioni (Integrated Information System for the acquisition, management and sharing of environmental data aimed to decision making). The main aim of the project is to design and develop an integrated environmental information platform able to provide monitoring services for decision support, integrating data from different environmental monitoring systems (including WSN). This ICT platform, based on a service-oriented architecture (SOA), will be developed to coordinate a wide variety of data acquisition systems, based on heterogeneous technologies and communication protocols, providing different sort of environmental monitoring services. The implementation and validation of the SESAMO platform and its services will involve three specific environmental domains: 1) Urban water losses; 2) Early warning system for rainfall-induced landslides; 3) Precision irrigation planning. Services in the first domain are enabled by a low cost sensors network collecting and transmitting data, in order to allow the pipeline network managers to analyze pressure, velocity and discharge data for reducing water losses in an urban contest. This paper outlines the SESAMO functional and technological structure and then gives a concise description of the service design and development process for the second and third domain. Services in the second domain are enabled by a prototypal early warning system able to identify in near-real time high-risk zones of rainfall-induced landslides. Services in the third domain are aimed to optimize irrigation planning of vineyards depending on plant water stress.

  10. Integrated Logistics Support Plan (ILSP) for the Ports and Waterways Safety System (PAWSS) Project - A Level I Major Acquisition

    DOT National Transportation Integrated Search

    1997-09-30

    This Integrated Logistics Support Plan (ILSP) serves as the master logistics planning document that describes necessary logistic activities, assigns responsibility for those activities, and establishes a schedule for completion. It is one of the init...

  11. Hypersonic research engine project. Phase 2: Aerothermodynamic integration model development

    NASA Technical Reports Server (NTRS)

    Jilly, L. F. (Editor)

    1971-01-01

    The fabrication of the various components of the HRE AIM was completed. The purge system necessary for the cavity bounded by the outer shell assembly and the outer cowl body was studied. Preparations were begun for establishing a format for test data acquisition and reduction.

  12. 48 CFR 335.070-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Policy. 335.070-1 Section... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 335.070-1 Policy. (a) Contracting activities shall encourage... resources available for the conduct of R & D projects and by promoting sound planning and prudent fiscal...

  13. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1987-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  14. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1988-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Flight Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  15. Advanced Data Acquisition Systems

    NASA Technical Reports Server (NTRS)

    Perotti, J.

    2003-01-01

    Current and future requirements of the aerospace sensors and transducers field make it necessary for the design and development of new data acquisition devices and instrumentation systems. New designs are sought to incorporate self-health, self-calibrating, self-repair capabilities, allowing greater measurement reliability and extended calibration cycles. With the addition of power management schemes, state-of-the-art data acquisition systems allow data to be processed and presented to the users with increased efficiency and accuracy. The design architecture presented in this paper displays an innovative approach to data acquisition systems. The design incorporates: electronic health self-check, device/system self-calibration, electronics and function self-repair, failure detection and prediction, and power management (reduced power consumption). These requirements are driven by the aerospace industry need to reduce operations and maintenance costs, to accelerate processing time and to provide reliable hardware with minimum costs. The project's design architecture incorporates some commercially available components identified during the market research investigation like: Field Programmable Gate Arrays (FPGA) Programmable Analog Integrated Circuits (PAC IC) and Field Programmable Analog Arrays (FPAA); Digital Signal Processing (DSP) electronic/system control and investigation of specific characteristics found in technologies like: Electronic Component Mean Time Between Failure (MTBF); and Radiation Hardened Component Availability. There are three main sections discussed in the design architecture presented in this document. They are the following: (a) Analog Signal Module Section, (b) Digital Signal/Control Module Section and (c) Power Management Module Section. These sections are discussed in detail in the following pages. This approach to data acquisition systems has resulted in the assignment of patent rights to Kennedy Space Center under U.S. patent # 6,462,684. Furthermore, NASA KSC commercialization office has issued licensing rights to Circuit Avenue Netrepreneurs, LLC , a minority-owned business founded in 1999 located in Camden, NJ.

  16. Preliminary study on X-ray fluorescence computed tomography imaging of gold nanoparticles: Acceleration of data acquisition by multiple pinholes scheme

    NASA Astrophysics Data System (ADS)

    Sasaya, Tenta; Sunaguchi, Naoki; Seo, Seung-Jum; Hyodo, Kazuyuki; Zeniya, Tsutomu; Kim, Jong-Ki; Yuasa, Tetsuya

    2018-04-01

    Gold nanoparticles (GNPs) have recently attracted attention in nanomedicine as novel contrast agents for cancer imaging. A decisive tomographic imaging technique has not yet been established to depict the 3-D distribution of GNPs in an object. An imaging technique known as pinhole-based X-ray fluorescence computed tomography (XFCT) is a promising method that can be used to reconstruct the distribution of GNPs from the X-ray fluorescence emitted by GNPs. We address the acceleration of data acquisition in pinhole-based XFCT for preclinical use using a multiple pinhole scheme. In this scheme, multiple projections are simultaneously acquired through a multi-pinhole collimator with a 2-D detector and full-field volumetric beam to enhance the signal-to-noise ratio of the projections; this enables fast data acquisition. To demonstrate the efficacy of this method, we performed an imaging experiment using a physical phantom with an actual multi-pinhole XFCT system that was constructed using the beamline AR-NE7A at KEK. The preliminary study showed that the multi-pinhole XFCT achieved a data acquisition time of 20 min at a theoretical detection limit of approximately 0.1 Au mg/ml and at a spatial resolution of 0.4 mm.

  17. A generic readout system for astrophysical detectors

    NASA Astrophysics Data System (ADS)

    Doumayrou, E.; Lortholary, M.

    2012-09-01

    We have developed a generic digital platform to fulfill the needs for the development of new detectors in astrophysics, which is used in lab, for ground-based telescopes instruments and also in prototype versions for space instruments development. This system is based on hardware FPGA electronic board (called MISE) together with software on a PC computer (called BEAR). The MISE board generates the fast clocking which reads the detectors thanks to a programmable digital sequencer and performs data acquisition, buffering of digitalized pixels outputs and interfaces with others boards. The data are then sent to the PC via a SpaceWire or Usb link. The BEAR software sets the MISE board up, makes data acquisition and enables the visualization, processing and the storage of data in line. These software tools are made of C++ and Labview (NI) on a Linux OS. MISE and BEAR make a generic acquisition architecture, on which dedicated analog boards are plugged, so that to accommodate with detectors specificity: number of pixels, the readout channels and frequency, analog bias and clock interfaces. We have used this concept to build a camera for the P-ARTEMIS project including a 256 pixels sub-millimeter bolometer detector at 10Kpixel/s (SPIE 7741-12 (2010)). For the EUCLID project, a lab camera is now working for the test of CCDs 4Mpixels at 4*200Kpixel/s. Another is working for the testing of new near infrared detectors (NIR LFSA for the ESA TRP program) 110Kpixels at 2*100Kpixels/s. Other projects are in progress for the space missions PLATO and SPICA.

  18. Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects

    DOT National Transportation Integrated Search

    2017-07-10

    This advisory circular (AC) provides guidance to sponsors of airport projects developed under the Airport Improvement Program (AIP) to meet the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Pl 9...

  19. Improving the Agency's Software Acquisition Capability

    NASA Technical Reports Server (NTRS)

    Hankinson, Allen

    2003-01-01

    External development of software has oftc n led to unsatisfactory results and great frustration for the assurE 7ce community. Contracts frequently omit critical assuranc 4 processes or the right to oversee software development activitie: At a time when NASA depends more and more on software to in plement critical system functions, combination of three factors ex; cerbate this problem: I ) the ever-increasing trend to acquire rather than develop software in-house, 2) the trend toward performance based contracts, and 3) acquisition vehicles that only state softwar 2 requirements while leaving development standards and assur! ince methodologies up to the contractor. We propose to identify specific methods at d tools that NASA projects can use to mitigate the adverse el ects of the three problems. TWO broad classes of methoddt ols will be explored. The first will be those that provide NASA p ojects with insight and oversight into contractors' activities. The st cond will be those that help projects objectively assess, and thus i nprwe, their software acquisition capability. Of particular interest is the Software Engineering Institute's (SEI) Software Acqt isition Capability Maturity Model (SA-CMMO).

  20. Expert system prototype developments for NASA-KSC business and engineering applications

    NASA Technical Reports Server (NTRS)

    Ragusa, James M.; Gonzalez, Avelino J.

    1988-01-01

    Prototype expert systems developed for a variety of NASA projects in the business/management and engineering domains are discussed. Business-related problems addressed include an assistant for simulating launch vehicle processing, a plan advisor for the acquisition of automated data processing equipment, and an expert system for the identification of customer requirements. Engineering problems treated include an expert system for detecting potential ignition sources in LOX and gaseous-oxygen transportation systems and an expert system for hazardous-gas detection.

  1. X-ray satellite (ROSAT)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.

  2. Guidance Oriented Acquisition of Learning Skills (Project GOALS). Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Musante, Patricia

    Guidance Oriented Acquisition of Learning Skills (Project GOALS) was a federally-funded project in three Brooklyn (New York) high schools in its fourth year of operation in 1992-93. It served 312 limited-English-proficient and 57 English-proficient students through instruction in English as a Second Language (ESL), native language arts (NLA) in…

  3. 43 CFR 8.0 - Acquisition of lands for reservoir projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... 8.0 Section 8.0 Public Lands: Interior Office of the Secretary of the Interior JOINT POLICIES OF THE DEPARTMENTS OF THE INTERIOR AND OF THE ARMY RELATIVE TO RESERVOIR PROJECT LANDS § 8.0 Acquisition of lands for reservoir projects. In so far as permitted by law, it is the policy of the Departments of the Interior and...

  4. Acquisition and production of skilled behavior in dynamic decision-making tasks

    NASA Technical Reports Server (NTRS)

    Kirlik, Alex

    1993-01-01

    Summaries of the four projects completed during the performance of this research are included. The four projects described are: Perceptual Augmentation Aiding for Situation Assessment, Perceptual Augmentation Aiding for Dynamic Decision-Making and Control, Action Advisory Aiding for Dynamic Decision-Making and Control, and Display Design to Support Time-Constrained Route Optimization. Papers based on each of these projects are currently in preparation. The theoretical framework upon which the first three projects are based, Ecological Task Analysis, was also developed during the performance of this research, and is described in a previous report. A project concerned with modeling strategies in human control of a dynamic system was also completed during the performance of this research.

  5. Thermal Expert System (TEXSYS): Systems autonomy demonstration project, volume 2. Results

    NASA Technical Reports Server (NTRS)

    Glass, B. J. (Editor)

    1992-01-01

    The Systems Autonomy Demonstration Project (SADP) produced a knowledge-based real-time control system for control and fault detection, isolation, and recovery (FDIR) of a prototype two-phase Space Station Freedom external active thermal control system (EATCS). The Thermal Expert System (TEXSYS) was demonstrated in recent tests to be capable of reliable fault anticipation and detection, as well as ordinary control of the thermal bus. Performance requirements were addressed by adopting a hierarchical symbolic control approach-layering model-based expert system software on a conventional, numerical data acquisition and control system. The model-based reasoning capabilities of TEXSYS were shown to be advantageous over typical rule-based expert systems, particularly for detection of unforeseen faults and sensor failures. Volume 1 gives a project overview and testing highlights. Volume 2 provides detail on the EATCS testbed, test operations, and online test results. Appendix A is a test archive, while Appendix B is a compendium of design and user manuals for the TEXSYS software.

  6. Thermal Expert System (TEXSYS): Systems automony demonstration project, volume 1. Overview

    NASA Technical Reports Server (NTRS)

    Glass, B. J. (Editor)

    1992-01-01

    The Systems Autonomy Demonstration Project (SADP) produced a knowledge-based real-time control system for control and fault detection, isolation, and recovery (FDIR) of a prototype two-phase Space Station Freedom external active thermal control system (EATCS). The Thermal Expert System (TEXSYS) was demonstrated in recent tests to be capable of reliable fault anticipation and detection, as well as ordinary control of the thermal bus. Performance requirements were addressed by adopting a hierarchical symbolic control approach-layering model-based expert system software on a conventional, numerical data acquisition and control system. The model-based reasoning capabilities of TEXSYS were shown to be advantageous over typical rule-based expert systems, particularly for detection of unforeseen faults and sensor failures. Volume 1 gives a project overview and testing highlights. Volume 2 provides detail on the EATCS test bed, test operations, and online test results. Appendix A is a test archive, while Appendix B is a compendium of design and user manuals for the TEXSYS software.

  7. Thermal Expert System (TEXSYS): Systems autonomy demonstration project, volume 2. Results

    NASA Astrophysics Data System (ADS)

    Glass, B. J.

    1992-10-01

    The Systems Autonomy Demonstration Project (SADP) produced a knowledge-based real-time control system for control and fault detection, isolation, and recovery (FDIR) of a prototype two-phase Space Station Freedom external active thermal control system (EATCS). The Thermal Expert System (TEXSYS) was demonstrated in recent tests to be capable of reliable fault anticipation and detection, as well as ordinary control of the thermal bus. Performance requirements were addressed by adopting a hierarchical symbolic control approach-layering model-based expert system software on a conventional, numerical data acquisition and control system. The model-based reasoning capabilities of TEXSYS were shown to be advantageous over typical rule-based expert systems, particularly for detection of unforeseen faults and sensor failures. Volume 1 gives a project overview and testing highlights. Volume 2 provides detail on the EATCS testbed, test operations, and online test results. Appendix A is a test archive, while Appendix B is a compendium of design and user manuals for the TEXSYS software.

  8. Development of a Data Acquisition System for Unmanned Aerial Vehicle (UAV) System Identification

    NASA Astrophysics Data System (ADS)

    Lear, Donald Joseph

    Aircraft system identification techniques are developed for fixed wing Unmanned Aerial Vehicles (UAV). The use of a designed flight experiment with measured system inputs/outputs can be used to derive aircraft stability derivatives. This project set out to develop a methodology to support an experiment to model pitch damping in the longitudinal short-period mode of a UAV. A Central Composite Response Surface Design was formed using angle of attack and power levels as factors to test for the pitching moment coefficient response induced by a multistep pitching maneuver. Selecting a high-quality data acquisition platform was critical to the success of the project. This system was designed to support fixed wing research through the addition of a custom air data vane capable of measuring angle of attack and sideslip, as well as an airspeed sensor. A Pixhawk autopilot system serves as the core and modification of the device firmware allowed for the integration of custom sensors and custom RC channels dedicated to performing system identification maneuvers. Tests were performed on all existing Pixhawk sensors to validate stated uncertainty values. The air data system was calibrated in a low speed wind tunnel and dynamic performance was verified. The assembled system was then installed in a commercially available UAV known as an Air Titan FPV in order to test the Pixhawk's automated flight maneuvers and determine the final performance of each sensor. Flight testing showed all the critical sensors produced acceptable data for further research. The Air Titan FPV airframe was found to be very flexible and did not lend itself well to accurate measurement of inertial properties. This realization prohibited the construction of the required math models for longitudinal dynamics. It is recommended that future projects using the developed methods choose an aircraft with a more rigid airframe.

  9. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As..., in accordance with sound real estate practices. Accordingly, fringe tracts will not be acquired until...

  10. UTOFIA: an underwater time-of-flight image acquisition system

    NASA Astrophysics Data System (ADS)

    Driewer, Adrian; Abrosimov, Igor; Alexander, Jonathan; Benger, Marc; O'Farrell, Marion; Haugholt, Karl Henrik; Softley, Chris; Thielemann, Jens T.; Thorstensen, Jostein; Yates, Chris

    2017-10-01

    In this article the development of a newly designed Time-of-Flight (ToF) image sensor for underwater applications is described. The sensor is developed as part of the project UTOFIA (underwater time-of-flight image acquisition) funded by the EU within the Horizon 2020 framework. This project aims to develop a camera based on range gating that extends the visible range compared to conventional cameras by a factor of 2 to 3 and delivers real-time range information by means of a 3D video stream. The principle of underwater range gating as well as the concept of the image sensor are presented. Based on measurements on a test image sensor a pixel structure that suits best to the requirements has been selected. Within an extensive characterization underwater the capability of distance measurements in turbid environments is demonstrated.

  11. Accelerated x-ray scatter projection imaging using multiple continuously moving pencil beams

    NASA Astrophysics Data System (ADS)

    Dydula, Christopher; Belev, George; Johns, Paul C.

    2017-03-01

    Coherent x-ray scatter varies with angle and photon energy in a manner dependent on the chemical composition of the scattering material, even for amorphous materials. Therefore, images generated from scattered photons can have much higher contrast than conventional projection radiographs. We are developing a scatter projection imaging prototype at the BioMedical Imaging and Therapy (BMIT) facility of the Canadian Light Source (CLS) synchrotron in Saskatoon, Canada. The best images are obtained using step-and-shoot scanning with a single pencil beam and area detector to capture sequentially the scatter pattern for each primary beam location on the sample. Primary x-ray transmission is recorded simultaneously using photodiodes. The technological challenge is to acquire the scatter data in a reasonable time. Using multiple pencil beams producing partially-overlapping scatter patterns reduces acquisition time but increases complexity due to the need for a disentangling algorithm to extract the data. Continuous sample motion, rather than step-and-shoot, also reduces acquisition time at the expense of introducing motion blur. With a five-beam (33.2 keV, 3.5 mm2 beam area) continuous sample motion configuration, a rectangular array of 12 x 100 pixels with 1 mm sampling width has been acquired in 0.4 minutes (3000 pixels per minute). The acquisition speed is 38 times the speed for single beam step-and-shoot. A system model has been developed to calculate detected scatter patterns given the material composition of the object to be imaged. Our prototype development, image acquisition of a plastic phantom and modelling are described.

  12. 48 CFR 1552.211-76 - Legal analysis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Legal analysis. 1552.211... Legal analysis. As prescribed in 1511.011-76, insert this contract clause when it is determined that the contract involves legal analysis. Legal Analysis (APR 1984) The Contractor shall furnish to the Project...

  13. 48 CFR 1552.211-76 - Legal analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Legal analysis. 1552.211... Legal analysis. As prescribed in 1511.011-76, insert this contract clause when it is determined that the contract involves legal analysis. Legal Analysis (APR 1984) The Contractor shall furnish to the Project...

  14. 48 CFR 22.804-2 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction. 22.804-2... are required to meet (1) the contract terms and conditions citing affirmative action requirements applicable to covered geographical areas or projects and (2) applicable requirements of 41 CFR 60-1 and 60-4...

  15. 48 CFR 28.305 - Overseas workers' compensation and war-hazard insurance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...' compensation and war-hazard insurance. 28.305 Section 28.305 Federal Acquisition Regulations System FEDERAL...' compensation and war-hazard insurance. (a) Public-work contract, as used in this subpart, means any contract... operations under service contracts and projects in connection with the national defense or with war...

  16. 48 CFR 315.201 - Exchanges with industry before receipt of proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Exchanges with industry... Receipt of Proposals and Information 315.201 Exchanges with industry before receipt of proposals. (e)(1... complex projects involving R & D, IT, construction, and other highly technical requirements. An RFI may...

  17. 48 CFR 36.609-1 - Design within funding limitations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Design within funding... Services 36.609-1 Design within funding limitations. (a) The Government may require the architect-engineer contractor to design the project so that construction costs will not exceed a contractually specified dollar...

  18. 48 CFR 36.302 - Scope of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scope of work. 36.302... Scope of work. The agency shall develop, either in-house or by contract, a scope of work that defines the project and states the Government's requirements. The scope of work may include criteria and...

  19. 48 CFR 36.302 - Scope of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scope of work. 36.302... Scope of work. The agency shall develop, either in-house or by contract, a scope of work that defines the project and states the Government's requirements. The scope of work may include criteria and...

  20. 48 CFR 1436.571 - Additive and deductive items.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Additive and deductive... Additive and deductive items. If it appears that funds available for a construction project may be... the work as specified and for one or more additive or deductive bid items which add or omit specified...

  1. 48 CFR 1436.571 - Additive and deductive items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Additive and deductive... Additive and deductive items. If it appears that funds available for a construction project may be... the work as specified and for one or more additive or deductive bid items which add or omit specified...

  2. 48 CFR 1436.571 - Additive and deductive items.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Additive and deductive... Additive and deductive items. If it appears that funds available for a construction project may be... the work as specified and for one or more additive or deductive bid items which add or omit specified...

  3. 48 CFR 1436.571 - Additive and deductive items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Additive and deductive... Additive and deductive items. If it appears that funds available for a construction project may be... the work as specified and for one or more additive or deductive bid items which add or omit specified...

  4. 48 CFR 1436.571 - Additive and deductive items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Additive and deductive... Additive and deductive items. If it appears that funds available for a construction project may be... the work as specified and for one or more additive or deductive bid items which add or omit specified...

  5. A Systems Approach to Expanding the Technology Readiness Level within Defense Acquisition

    DTIC Science & Technology

    2009-03-20

    Aeronautics and Space Administration’s (NASA) post-Apollo era as ontology for contracting support (Sadin, Povinelli & Rosen, 1989). In the last nine years...2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48(8), 1008-1023. Sadin, S. R., Povinelli , F. P

  6. New Media in the Design of a Learners' Dictionary.

    ERIC Educational Resources Information Center

    Gamper, Johann; Knapp, Judith

    This paper presents an interdisciplinary research project that aims at developing an electronic vocabulary acquisition system for the German and the Italian language called ELDIT (Elektronisches Lern(er)worterbuch Deutsch Italienisch). The approach for studying and practicing the vocabulary. To ensure maximum effectiveness of the learning process,…

  7. 48 CFR 1452.237-71 - Utilization of Woody Biomass.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Biomass. 1452.237-71 Section 1452.237-71 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Utilization of Woody Biomass. As prescribed in § 1437.7202, insert the following clause: Utilization of Woody Biomass (MAY 2005) (a) The contractor may remove and utilize woody biomass, if: (1) Project work is...

  8. Summary of spacecraft technology, systems reliability, and tracking data acquisition

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Goddard activities are reported for 1973. An eight-year flight schedule for projected space missions is presented. Data acquired by spacecraft in the following disciplines are described: stellar ultraviolet, stellar X-rays, stellar gamma rays, solar radiation, radio astronomy, particles/fields, magnetosphere, aurora, and the upper atmosphere.

  9. Replacing the Engine In Your Car While You Are Still Driving It

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bjorklund, Eric A.

    Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with theirmore » own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.« less

  10. A method for the real-time construction of a full parallax light field

    NASA Astrophysics Data System (ADS)

    Tanaka, Kenji; Aoki, Soko

    2006-02-01

    We designed and implemented a light field acquisition and reproduction system for dynamic objects called LiveDimension, which serves as a 3D live video system for multiple viewers. The acquisition unit consists of circularly arranged NTSC cameras surrounding an object. The display consists of circularly arranged projectors and a rotating screen. The projectors are constantly projecting images captured by the corresponding cameras onto the screen. The screen rotates around an in-plane vertical axis at a sufficient speed so that it faces each of the projectors in sequence. Since the Lambertian surfaces of the screens are covered by light-collimating plastic films with vertical louver patterns that are used for the selection of appropriate light rays, viewers can only observe images from a projector located in the same direction as the viewer. Thus, the dynamic view of an object is dependent on the viewer's head position. We evaluated the system by projecting both objects and human figures and confirmed that the entire system can reproduce light fields with a horizontal parallax to display video sequences of 430x770 pixels at a frame rate of 45 fps. Applications of this system include product design reviews, sales promotion, art exhibits, fashion shows, and sports training with form checking.

  11. Pilot's Automated Weather Support System (PAWSS) concepts demonstration project. Phase 1: Pilot's weather information requirements and implications for weather data systems design

    NASA Technical Reports Server (NTRS)

    Crabill, Norman L.; Dash, Ernie R.

    1991-01-01

    The weather information requirements for pilots and the deficiencies of the current aviation weather support system in meeting these requirements are defined. As the amount of data available to pilots increases significantly in the near future, expert system technology will be needed to assist pilots in assimilating that information. Some other desirable characteristics of an automation-assisted system for weather data acquisition, dissemination, and assimilation are also described.

  12. Graphical User Interface for an Observing Control System for the UK Infrared Telescope

    NASA Astrophysics Data System (ADS)

    Tan, M.; Bridger, A.; Wright, G. S.; Adamson, A. J.; Currie, M. J.; Economou, F.

    A Graphical user interface for the observing control system of UK Infrared Telescope has been developed as a part of the ORAC (Observatory Reduction and Acquisition Control) Project. We analyzed and designed the system using the Unified Modelling Language (UML) with the CASE tool Rational Rose 98. The system has been implemented in a modular way with Java packages using Swing and RMI. This system is component-based with pluggability. Object orientation concepts and UML notations have been applied throughout the development.

  13. Accelerated Optical Projection Tomography Applied to In Vivo Imaging of Zebrafish

    PubMed Central

    Correia, Teresa; Yin, Jun; Ramel, Marie-Christine; Andrews, Natalie; Katan, Matilda; Bugeon, Laurence; Dallman, Margaret J.; McGinty, James; Frankel, Paul; French, Paul M. W.; Arridge, Simon

    2015-01-01

    Optical projection tomography (OPT) provides a non-invasive 3-D imaging modality that can be applied to longitudinal studies of live disease models, including in zebrafish. Current limitations include the requirement of a minimum number of angular projections for reconstruction of reasonable OPT images using filtered back projection (FBP), which is typically several hundred, leading to acquisition times of several minutes. It is highly desirable to decrease the number of required angular projections to decrease both the total acquisition time and the light dose to the sample. This is particularly important to enable longitudinal studies, which involve measurements of the same fish at different time points. In this work, we demonstrate that the use of an iterative algorithm to reconstruct sparsely sampled OPT data sets can provide useful 3-D images with 50 or fewer projections, thereby significantly decreasing the minimum acquisition time and light dose while maintaining image quality. A transgenic zebrafish embryo with fluorescent labelling of the vasculature was imaged to acquire densely sampled (800 projections) and under-sampled data sets of transmitted and fluorescence projection images. The under-sampled OPT data sets were reconstructed using an iterative total variation-based image reconstruction algorithm and compared against FBP reconstructions of the densely sampled data sets. To illustrate the potential for quantitative analysis following rapid OPT data acquisition, a Hessian-based method was applied to automatically segment the reconstructed images to select the vasculature network. Results showed that 3-D images of the zebrafish embryo and its vasculature of sufficient visual quality for quantitative analysis can be reconstructed using the iterative algorithm from only 32 projections—achieving up to 28 times improvement in imaging speed and leading to total acquisition times of a few seconds. PMID:26308086

  14. Deployed Analyst History Report, Volume 2. Analytic Support to Combat Operations in the Philippines (2011-2014)

    DTIC Science & Technology

    2015-12-01

    Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) to the Philippines for Operation ENDURING FREEDOM – Philippines (OEF-P). PROJECT...management, doctrine and force development, training management, system testing, system acquisition, decision analysis, and resource management, as...influenced procurement decisions and reshaped Army doctrine . Additionally, CAA itself has benefited in numerous ways. Combat experience provides analysts

  15. The RITE Approach to Agile Acquisition

    DTIC Science & Technology

    2013-04-01

    SSCPAC. He currently provides project management and technical support to the Global Command and Control System–Joint (GCCS-J) Integrated Imagery and...the Strike Planning and Execution Systems Program Office (PMA-281). Boyce has a Bachelor of Science degree in information systems management and is...has since provided dedicated professional service to the USAF, NAVSUP, and SSCPAC. Roussel has a Bachelor of Science degree in management and a Master

  16. Intelligent multi-sensor integrations

    NASA Technical Reports Server (NTRS)

    Volz, Richard A.; Jain, Ramesh; Weymouth, Terry

    1989-01-01

    Growth in the intelligence of space systems requires the use and integration of data from multiple sensors. Generic tools are being developed for extracting and integrating information obtained from multiple sources. The full spectrum is addressed for issues ranging from data acquisition, to characterization of sensor data, to adaptive systems for utilizing the data. In particular, there are three major aspects to the project, multisensor processing, an adaptive approach to object recognition, and distributed sensor system integration.

  17. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  18. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  19. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  20. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  1. 14 CFR 151.73 - Land acquisition.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Land acquisition. 151.73 Section 151.73 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.73 Land acquisition. (a) The acquisition of...

  2. Flat panel detector-based cone beam computed tomography with a circle-plus-two-arcs data acquisition orbit: preliminary phantom study.

    PubMed

    Ning, Ruola; Tang, Xiangyang; Conover, David; Yu, Rongfeng

    2003-07-01

    Cone beam computed tomography (CBCT) has been investigated in the past two decades due to its potential advantages over a fan beam CT. These advantages include (a) great improvement in data acquisition efficiency, spatial resolution, and spatial resolution uniformity, (b) substantially better utilization of x-ray photons generated by the x-ray tube compared to a fan beam CT, and (c) significant advancement in clinical three-dimensional (3D) CT applications. However, most studies of CBCT in the past are focused on cone beam data acquisition theories and reconstruction algorithms. The recent development of x-ray flat panel detectors (FPD) has made CBCT imaging feasible and practical. This paper reports a newly built flat panel detector-based CBCT prototype scanner and presents the results of the preliminary evaluation of the prototype through a phantom study. The prototype consisted of an x-ray tube, a flat panel detector, a GE 8800 CT gantry, a patient table and a computer system. The prototype was constructed by modifying a GE 8800 CT gantry such that both a single-circle cone beam acquisition orbit and a circle-plus-two-arcs orbit can be achieved. With a circle-plus-two-arcs orbit, a complete set of cone beam projection data can be obtained, consisting of a set of circle projections and a set of arc projections. Using the prototype scanner, the set of circle projections were acquired by rotating the x-ray tube and the FPD together on the gantry, and the set of arc projections were obtained by tilting the gantry while the x-ray tube and detector were at the 12 and 6 o'clock positions, respectively. A filtered backprojection exact cone beam reconstruction algorithm based on a circle-plus-two-arcs orbit was used for cone beam reconstruction from both the circle and arc projections. The system was first characterized in terms of the linearity and dynamic range of the detector. Then the uniformity, spatial resolution and low contrast resolution were assessed using different phantoms mainly in the central plane of the cone beam reconstruction. Finally, the reconstruction accuracy of using the circle-plus-two-arcs orbit and its related filtered backprojection cone beam volume CT reconstruction algorithm was evaluated with a specially designed disk phantom. The results obtained using the new cone beam acquisition orbit and the related reconstruction algorithm were compared to those obtained using a single-circle cone beam geometry and Feldkamp's algorithm in terms of reconstruction accuracy. The results of the study demonstrate that the circle-plus-two-arcs cone beam orbit is achievable in practice. Also, the reconstruction accuracy of cone beam reconstruction is significantly improved with the circle-plus-two-arcs orbit and its related exact CB-FPB algorithm, as compared to using a single circle cone beam orbit and Feldkamp's algorithm.

  3. Integrated Baseline Review (IBR) Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    An Integrated Baseline Review (IBR) is a review of a supplier?s Performance Measurement Baseline (PMB). It is conducted by Program/Project Managers and their technical staffs on contracts and in-house work requiring compliance with NASA Earned Value Management System (EVMS) policy as defined in program/project policy, NPR 7120.5, or in NASA Federal Acquisition Regulations. The IBR Handbook may also be of use to those responsible for preparing the Terms of Reference for internal project reviews. While risks may be identified and actions tracked as a result of the IBR, it is important to note that an IBR cannot be failed.

  4. The Electronics and Data Acquisition System of the DarkSide Dark Matter Search

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agnes, P.; et al.

    2014-12-09

    It is generally inferred from astronomical measurements that Dark Matter (DM) comprises approximately 27\\% of the energy-density of the universe. If DM is a subatomic particle, a possible candidate is a Weakly Interacting Massive Particle (WIMP), and the DarkSide-50 (DS) experiment is a direct search for evidence of WIMP-nuclear collisions. DS is located underground at the Laboratori Nazionali del Gran Sasso (LNGS) in Italy, and consists of three active, embedded components; an outer water veto (CTF), a liquid scintillator veto (LSV), and a liquid argon (LAr) time projection chamber (TPC). This paper describes the data acquisition and electronic systems ofmore » the DS detectors, designed to detect the residual ionization from such collisions.« less

  5. Overview of the Miniature Sensor Technology Integration (MSTI) spacecraft attitude control system

    NASA Technical Reports Server (NTRS)

    Mcewen, Rob

    1994-01-01

    Msti2 is a small, 164 kg (362 lb), 3-axis stabilized, low-Earth-orbiting satellite whose mission is missile booster tracking. The spacecraft is actuated by 3 reaction wheels and 12 hot gas thrusters. It carries enough fuel for a projected life of 6 months. The sensor complement consists of a Horizon Sensor, a Sun Sensor, low-rate gyros, and a high rate gyro for despin. The total pointing control error allocation is 6 mRad (.34 Deg), and this is while tracking a target on the Earth's surface. This paper describes the Attitude Control System (ACS) algorithms which include the following: attitude acquisition (despin, Sun and Earth acquisition), attitude determination, attitude control, and linear stability analysis.

  6. Latest Development in Advanced Sensors at Kennedy Space Center (KSC)

    NASA Technical Reports Server (NTRS)

    Perotti, Jose M.; Eckhoff, Anthony J.; Voska, N. (Technical Monitor)

    2002-01-01

    Inexpensive space transportation system must be developed in order to make spaceflight more affordable. To achieve this goal, there is a need to develop inexpensive smart sensors to allow autonomous checking of the health of the vehicle and associated ground support equipment, warn technicians or operators of an impending problem and facilitate rapid vehicle pre-launch operations. The Transducers and Data Acquisition group at Kennedy Space Center has initiated an effort to study, research, develop and prototype inexpensive smart sensors to accomplish these goals. Several technological challenges are being investigated and integrated in this project multi-discipline sensors; self-calibration, health self-diagnosis capabilities embedded in sensors; advanced data acquisition systems with failure prediction algorithms and failure correction (self-healing) capabilities.

  7. Job Attitudes of AFSC (Air Force Systems Command) Acquisition Project Managers.

    DTIC Science & Technology

    1986-04-01

    for performance (3rd ed.). Homewood, IL: Irwin. Ajzen , 1. & Fishbein , M . (1977). Attitude-behavior relations: A theoretical analysis and review of...factors that may be influencing job attitudes. I X. Chapter One I NTRODUCTION Today, about 2000 Air Force members manage the acquisit ion of bi1lions of...ison.i .ncl I (’ate" Nt ro’ p 2ject ranager s and cther AFSC o tI c rs ha N.e s ie m a r - a t t ,.des, IL t their att itudes ai e lower compai ed to

  8. 32 CFR 644.7 - Acquisition lines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Acquisition lines. 644.7 Section 644.7 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.7 Acquisition lines. (a) Tentative acquisition lines. As...

  9. Indirect-detection single-photon-counting x-ray detector for breast tomosynthesis

    NASA Astrophysics Data System (ADS)

    Jiang, Hao; Kaercher, Joerg; Durst, Roger

    2016-03-01

    X-ray mammography is a crucial screening tool for early identification of breast cancer. However, the overlap of anatomical features present in projection images often complicates the task of correctly identifying suspicious masses. As a result, there has been increasing interest in acquisition of volumetric information through digital breast tomosynthesis (DBT) which, compared to mammography, offers the advantage of depth information. Since DBT requires acquisition of many projection images, it is desirable that the noise in each projection image be dominated by the statistical noise of the incident x-ray quanta and not by the additive noise of the imaging system (referred to as quantum-limited imaging) and that the cumulative dose be as low as possible (e.g., no more than for a mammogram). Unfortunately, the electronic noise (~2000 electrons) present in current DBT systems based on active matrix, flat-panel imagers (AMFPIs) is still relatively high compared with modest x-ray gain of the a-Se and CsI:Tl x-ray converters often used. To overcome the modest signal-to-noise ratio (SNR) limitations of current DBT systems, we have developed a large-area x-ray imaging detector with the combination of an extremely low noise (~20 electrons) active-pixel CMOS and a specially designed high resolution scintillator. The high sensitivity and low noise of such system provides better SNR by at least an order of magnitude than current state-of-art AMFPI systems and enables x-ray indirect-detection single photon counting (SPC) at mammographic energies with the potential of dose reduction.

  10. [Multi-channel data collection and visualization system for intramyocardial electrograms].

    PubMed

    Kastner, P; Wimmer, W; Hutten, H

    2000-11-01

    The aim of the project was to develop a multichannel data acquisition system for the recording and visualisation of intramyocardial electrograms (IEGM) from both the spontaneously beating and the artificially paced heart. Signal processing comprises multi-step amplification, filtering (0.05-800 Hz), and AD conversion (12 Bit max. 6.25 kHz). IEGMs can be obtained either in unipolar or bipolar mode. Stimulation of the heart is achieved by an incorporated programmable dual-chamber pacemaker that can be selectively switched to the input channels. A LabView-based graphical user interface permits the programming of all system parameters via a microcontroller, and supports data acquisition and visualisation. The system can be used in animal experiments to monitor the spread of excitation across the heart, to measure propagation velocity, or to measure the impact of drugs and pathological changes on the morphology of IEGMs.

  11. History of Concurrency. The Controversy of Military Acquisition Program Schedule Compression

    DTIC Science & Technology

    1986-09-01

    33 The Manhattan Project . ........... 35 Post-War Acquisition . . . . ...... 40 The Lockheed Skunk Works ........ 42 iii Era of Controversy...been involved Vin the Manhattan Project (47:55). The concurrency concept and the innovative foundation of the Air Force Ballistic Missile Program...inter- F4 continental oallistic missile. To snorten the program’s development time they drew upon lessons from the Manhattan Project and made three

  12. Declarative Knowledge Acquisition in Immersive Virtual Learning Environments

    ERIC Educational Resources Information Center

    Webster, Rustin

    2016-01-01

    The author investigated the interaction effect of immersive virtual reality (VR) in the classroom. The objective of the project was to develop and provide a low-cost, scalable, and portable VR system containing purposely designed and developed immersive virtual learning environments for the US Army. The purpose of the mixed design experiment was…

  13. Solid-state NMR imaging system

    DOEpatents

    Gopalsami, Nachappa; Dieckman, Stephen L.; Ellingson, William A.

    1992-01-01

    An apparatus for use with a solid-state NMR spectrometer includes a special imaging probe with linear, high-field strength gradient fields and high-power broadband RF coils using a back projection method for data acquisition and image reconstruction, and a real-time pulse programmer adaptable for use by a conventional computer for complex high speed pulse sequences.

  14. Development of human factors guidelines for advanced traveler information systems and commercial vehicle operations : definition and prioritization of research studies

    DOT National Transportation Integrated Search

    1997-03-01

    The goal of the activities documented in this report was to produce a prioritized list of candidate studies and issues that would guide data acquisition in this project. This goal was accomplished in three steps. First, 91 issues were compiled from e...

  15. Noise Reduction by Signal Accumulation

    ERIC Educational Resources Information Center

    Kraftmakher, Yaakov

    2006-01-01

    The aim of this paper is to show how the noise reduction by signal accumulation can be accomplished with a data acquisition system. This topic can be used for student projects. In many cases, the noise reduction is an unavoidable part of experimentation. Several techniques are known for this purpose, and among them the signal accumulation is the…

  16. AAFE man-made noise experiment project. Volume 2: Project and experiment discussions

    NASA Technical Reports Server (NTRS)

    1974-01-01

    An experiment for the acquisition and processing of man-made noise interference data on earth orbital altitudes is discussed. The objectives of the project are to confirm the results of analytical studies concerning radio frequency man-made noise in space. It is stated that the measurements of the amounts and types of noise in frequency bands of interest could allow the allocation and utilization of frequencies to be optimized and would also contribute to the engineering objective of optimizing flight receiving systems. A second objective of the project was to design and fabricate a noise measuring receiver which would demonstrate the feasibility of the experiment design under the project. The procedures for acquiring and processing the electromagnetic radiation data are discussed.

  17. Joint Test Project Report of Combat Air Support Target Acquisition Program. SEEKVAL. Project IA2. Direct Visual Imagery Experiments.

    DTIC Science & Technology

    1975-01-01

    Mission Zero Briefing Information ... ....... 1-A-8 Mission Zero Preflight Taped Coiments . . . 1-A-lO Mission Zero Inflight Events and Commentary . l-A...acquisitions between MAR and the target and zero range for non-acquisitions. AA 1 ... , ; "~...,, X0 ..o", xix S w...target from 35,000 feet to zero feet at nadir. If the inter-target interval was less than 35,000 feet, the device started counting on the new target

  18. Acquisition, capitalization, modeling and sharing of volcanic and seismic monitoring data at La Réunion Island

    NASA Astrophysics Data System (ADS)

    Boissier, Patrice; Di Muro, Andrea; Henriette, Laura; Rivière, Audrey; Roult, Geneviève; Agrinier, Pierre; Beauducel, François; Davoine, Paule-Annick; Dyon, Joël; Ferrazzini, Valérie; Kowalski, Philippe; Lemarchand, Arnaud; Nercessian, Alexandre; Peltier, Aline; Shapiro, Nikolai; Staudacher, Thomas; Villeneuve, Nicolas

    2014-05-01

    Piton de la Fournaise is one of the most active volcano in the world with an average of one eruption every 9 months, and rest periods of short duration (only 2 periods exceeded 5 years during the last 50 years). Even if 97 percent of the recent volcanic activity took place within the uninhabited Enclos Fouque caldera; only 3 eruptions occurred outside of the caldera, threatening inhabited areas. The distal 1977 eruption (NE rift), the lave flows of which passed through Piton Sainte-Rose village, destroying houses and forced the evacuation of part of the population, triggered an awareness of volcanic risk at Piton de la Fournaise and led to the creation of the Piton de la Fournaise Volcano Observatory (OVPF - IPGP) in 1979. During thirty-five years, the continuous monitoring networks (geophysical and geochemical), measurements campaigns and phenomenological observation (e.g. imaging and films in the visible and infrared) have built an extraordinary amount of heterogeneous data in terms of format (digital and analog) and storage supports (paper, magnetic tape, floppy disk, etc.). With the aim to structure and distribute the data acquired since its establishment the OVPF conceived an innovative project for "Acquisition, capitalization, modeling and sharing of volcanic and seismic monitoring data at La Reunion Island". The project is funded by the European Regional Development Fund - Convergence (2007-2013) and supported by the local government (Region Reunion). The project is structured around two main parts : - Action 1: acquisition, digitizing and data backup, - Action 2: development of an Information System. On one hand, the project has the ultimate goal to facilitate the distribution of high quality data and long time series to the largest number of beneficiaries of the local, national and international scientific community and of the public and private sectors through IPGP Internet portals (IPGP Data Center and VOLOBSIS). On the other hand, the information system will allow a complete and modern analysis of all the datasets acquired by the OVPF (notably through the WebObs system), and thus improve the understanding of volcanism and seismicity at La Reunion Island.

  19. Sensor Acquisition for Water Utilities: A Survey and Technology List

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alai, M; Glascoe, L; Love, A

    2005-03-07

    The early detection of the deliberate biological and chemical contamination of water distribution systems is a necessary capability for securing the nation's water supply. Current and emerging early-detection technology capabilities and shortcomings need to be identified and assessed to provide government agencies and water utilities with an improved methodology for assessing the value of installing these technologies. The Department of Homeland Security (DHS) has tasked a multi-laboratory team to evaluate current and future needs to protect the nation's water distribution infrastructure by supporting an objective evaluation of current and new technologies. The primary deliverables from this Operational Technology Demonstration (OTD)more » are the following: (1) establishment of an advisory board for review and approval of testing protocols, technology acquisition processes and recommendations for technology test and evaluation in laboratory and field settings; (2) development of a technology acquisition process; (3) creation of laboratory and field testing and evaluation capability; and (4) testing of candidate technologies for insertion into a water early warning system. The initial phase of this study involves the development of two separate but complementary strategies to be reviewed by the advisory board: (1) a technology acquisition strategy, and (2) a technology evaluation strategy. Lawrence Livermore National Laboratory and Sandia National Laboratories are tasked with the first strategy, while Los Alamos, Pacific Northwest, and Oak Ridge National Laboratories are tasked with the second strategy. The first goal of the acquisition strategy is the development of a technology survey process that includes a review of previous sensor surveys and current test programs and then the development of a method to solicit and select existing and emerging sensor technologies for evaluation and testing. In this paper we discuss a survey of previous efforts by governmental agencies and private companies with the aim of facilitating a water sensor technology acquisition procedure. We provide a survey of previous sensor studies with regard to the use of Early Warning Systems (EWS) including earlier surveys, testing programs, and response studies. In the project we extend this earlier work by developing a list of important sensor specifications that are then used to help assemble a sensor selection criteria. A list of sensor technologies with their specifications is appended to this document. This list will assist the second goal of the project which is a recommendation of candidate technologies for laboratory and field testing.« less

  20. Army Corps of Engineers, Southwestern Division, Reservoir Control Center Annual Report 1988

    DTIC Science & Technology

    1989-01-01

    water control data system. This system includes the equipment and software used for the acquisition, transmission and processing of real-time hydrologic... transmission . The SWD system was installed at the Federal Center in Fort Worth, Texas, in September 1983. This is a Synergetics Model 10C direct Readout Ground...reservoir projects under control of the Department of the Army in the area comprising all of Arkansas and Louisiana and portions of Missouri, Kansas

  1. The Specification of Cortical Subcerebral Projection Neurons Depends on the Direct Repression of TBR1 by CTIP1/BCL11a.

    PubMed

    Cánovas, José; Berndt, F Andrés; Sepúlveda, Hugo; Aguilar, Rodrigo; Veloso, Felipe A; Montecino, Martín; Oliva, Carlos; Maass, Juan C; Sierralta, Jimena; Kukuljan, Manuel

    2015-05-13

    The acquisition of distinct neuronal fates is fundamental for the function of the cerebral cortex. We find that the development of subcerebral projections from layer 5 neurons in the mouse neocortex depends on the high levels of expression of the transcription factor CTIP1; CTIP1 is coexpressed with CTIP2 in neurons that project to subcerebral targets and with SATB2 in those that project to the contralateral cortex. CTIP1 directly represses Tbr1 in layer 5, which appears as a critical step for the acquisition of the subcerebral fate. In contrast, lower levels of CTIP1 in layer 6 are required for TBR1 expression, which directs the corticothalamic fate. CTIP1 does not appear to play a critical role in the acquisition of the callosal projection fate in layer 5. These findings unravel a key step in the acquisition of cell fate for closely related corticofugal neurons and indicate that differential dosages of transcriptions factors are critical to specify different neuronal identities. Copyright © 2015 the authors 0270-6474/15/357552-13$15.00/0.

  2. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  3. Contribution of wind energy to the energy balance of a combined solar and wind energy system. Part 1: System description, data acquisition and system performance

    NASA Astrophysics Data System (ADS)

    Ferger, R.; Machens, U.

    1985-05-01

    A one-family house was equipped with a combined solar and wind energy system plus a night storage heater to measure the seasonal complementary contribution of wind and solar energy to energy demand. Project implementation, problems encountered and modifications to the initial system are described. Meteorological and operational data and house consumption data were recorded on computer-based measuring system. Data on the combined effects of and interdependence between solar collector and wind energy converter are discussed.

  4. !CHAOS: A cloud of controls

    NASA Astrophysics Data System (ADS)

    Angius, S.; Bisegni, C.; Ciuffetti, P.; Di Pirro, G.; Foggetta, L. G.; Galletti, F.; Gargana, R.; Gioscio, E.; Maselli, D.; Mazzitelli, G.; Michelotti, A.; Orrù, R.; Pistoni, M.; Spagnoli, F.; Spigone, D.; Stecchi, A.; Tonto, T.; Tota, M. A.; Catani, L.; Di Giulio, C.; Salina, G.; Buzzi, P.; Checcucci, B.; Lubrano, P.; Piccini, M.; Fattibene, E.; Michelotto, M.; Cavallaro, S. R.; Diana, B. F.; Enrico, F.; Pulvirenti, S.

    2016-01-01

    The paper is aimed to present the !CHAOS open source project aimed to develop a prototype of a national private Cloud Computing infrastructure, devoted to accelerator control systems and large experiments of High Energy Physics (HEP). The !CHAOS project has been financed by MIUR (Italian Ministry of Research and Education) and aims to develop a new concept of control system and data acquisition framework by providing, with a high level of aaabstraction, all the services needed for controlling and managing a large scientific, or non-scientific, infrastructure. A beta version of the !CHAOS infrastructure will be released at the end of December 2015 and will run on private Cloud infrastructures based on OpenStack.

  5. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harben, P E; Harris, D; Myers, S

    Seismic imaging and tracking methods have intelligence and monitoring applications. Current systems, however, do not adequately calibrate or model the unknown geological heterogeneity. Current systems are also not designed for rapid data acquisition and analysis in the field. This project seeks to build the core technological capabilities coupled with innovative deployment, processing, and analysis methodologies to allow seismic methods to be effectively utilized in the applications of seismic imaging and vehicle tracking where rapid (minutes to hours) and real-time analysis is required. The goal of this project is to build capabilities in acquisition system design, utilization and in full 3Dmore » finite difference modeling as well as statistical characterization of geological heterogeneity. Such capabilities coupled with a rapid field analysis methodology based on matched field processing are applied to problems associated with surveillance, battlefield management, finding hard and deeply buried targets, and portal monitoring. This project benefits the U.S. military and intelligence community in support of LLNL's national-security mission. FY03 was the final year of this project. In the 2.5 years this project has been active, numerous and varied developments and milestones have been accomplished. A wireless communication module for seismic data was developed to facilitate rapid seismic data acquisition and analysis. The E3D code was enhanced to include topographic effects. Codes were developed to implement the Karhunen-Loeve (K-L) statistical methodology for generating geological heterogeneity that can be utilized in E3D modeling. The matched field processing methodology applied to vehicle tracking and based on a field calibration to characterize geological heterogeneity was tested and successfully demonstrated in a tank tracking experiment at the Nevada Test Site. A 3-seismic-array vehicle tracking testbed was installed on-site at LLNL for testing real-time seismic tracking methods. A field experiment was conducted over a tunnel at the Nevada Site that quantified the tunnel reflection signal and, coupled with modeling, identified key needs and requirements in experimental layout of sensors. A large field experiment was conducted at the Lake Lynn Laboratory, a mine safety research facility in Pennsylvania, over a tunnel complex in realistic, difficult conditions. This experiment gathered the necessary data for a full 3D attempt to apply the methodology. The experiment also collected data to analyze the capabilities to detect and locate in-tunnel explosions for mine safety and other applications.« less

  7. Costing Future Complex and Novel Projects

    DTIC Science & Technology

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Costing Future Complex & Novel Projects Michael Pryce, Centre for Defence ...Novel Projects Michael Pryce, Centre for Defence Acquisition, Cranfield University Controlling Costs: The 6-3-5 Method—Case Studies at NAVSEA and...a Lecturer in defence acquisition at Cranfield University. He teaches across a range of subjects, including the use of costing in acquisition and

  8. The electronics and data acquisition system for the DarkSide-50 veto detectors

    NASA Astrophysics Data System (ADS)

    Agnes, P.; Agostino, L.; Albuquerque, I. F. M.; Alexander, T.; Alton, A. K.; Arisaka, K.; Back, H. O.; Baldin, B.; Biery, K.; Bonfini, G.; Bossa, M.; Bottino, B.; Brigatti, A.; Brodsky, J.; Budano, F.; Bussino, S.; Cadeddu, M.; Cadoni, M.; Calaprice, F.; Canci, N.; Candela, A.; Cao, H.; Cariello, M.; Carlini, M.; Catalanotti, S.; Cavalcante, P.; Chepurnov, A.; Cocco, A. G.; Covone, G.; Crippa, L.; D'Angelo, D.; D'Incecco, M.; Davini, S.; De Cecco, S.; De Deo, M.; De Vincenzi, M.; Derbin, A.; Devoto, A.; Di Eusanio, F.; Di Pietro, G.; Edkins, E.; Empl, A.; Fan, A.; Fiorillo, G.; Fomenko, K.; Foster, G.; Franco, D.; Gabriele, F.; Galbiati, C.; Giganti, C.; Goretti, A. M.; Granato, F.; Grandi, L.; Gromov, M.; Guan, M.; Guardincerri, Y.; Hackett, B. R.; Herner, K. R.; Hungerford, E. V.; Ianni, Aldo; Ianni, Andrea; James, I.; Jollet, C.; Keeter, K.; Kendziora, C. L.; Kobychev, V.; Koh, G.; Korablev, D.; Korga, G.; Kubankin, A.; Li, X.; Lissia, M.; Lombardi, P.; Luitz, S.; Ma, Y.; Machulin, I. N.; Mandarano, A.; Mari, S. M.; Maricic, J.; Marini, L.; Martoff, C. J.; Meregaglia, A.; Meyers, P. D.; Miletic, T.; Milincic, R.; Montanari, D.; Monte, A.; Montuschi, M.; Monzani, M. E.; Mosteiro, P.; Mount, B. J.; Muratova, V. N.; Musico, P.; Napolitano, J.; Nelson, A.; Odrowski, S.; Orsini, M.; Ortica, F.; Pagani, L.; Pallavicini, M.; Pantic, E.; Parmeggiano, S.; Pelczar, K.; Pelliccia, N.; Pocar, A.; Pordes, S.; Pugachev, D. A.; Qian, H.; Randle, K.; Ranucci, G.; Razeto, A.; Reinhold, B.; Renshaw, A. L.; Riffard, Q.; Romani, A.; Rossi, B.; Rossi, N.; Rountree, S. D.; Sablone, D.; Saggese, P.; Saldanha, R.; Sands, W.; Sangiorgio, S.; Savarese, C.; Segreto, E.; Semenov, D. A.; Shields, E.; Singh, P. N.; Skorokhvatov, M. D.; Smirnov, O.; Sotnikov, A.; Stanford, C.; Suvorov, Y.; Tartaglia, R.; Tatarowicz, J.; Testera, G.; Tonazzo, A.; Trinchese, P.; Unzhakov, E. V.; Vishneva, A.; Vogelaar, R. B.; Wada, M.; Walker, S.; Wang, H.; Wang, Y.; Watson, A. W.; Westerdale, S.; Wilhelmi, J.; Wojcik, M. M.; Xiang, X.; Xu, J.; Yang, C.; Yoo, J.; Zavatarelli, S.; Zec, A.; Zhong, W.; Zhu, C.; Zuzel, G.

    2016-12-01

    DarkSide-50 is a detector for dark matter candidates in the form of weakly interacting massive particles. It utilizes a liquid argon time projection chamber for the inner main detector, surrounded by a liquid scintillator veto (LSV) and a water Cherenkov veto detector (WCV). The LSV and WCV act as the neutron and cosmogenic muon veto detectors for DarkSide-50. This paper describes the electronics and data acquisition system used for these two detectors. The system is made of a custom built front end electronics and commercial National Instruments high speed digitizers. The front end electronics, the DAQ, and the trigger system have been used to acquire data in the form of zero-suppressed waveform samples from the 110 PMTs of the LSV and the 80 PMTs of the WCV. The veto DAQ system has proven its performance and reliability. This electronics and DAQ system can be scaled and used as it is for the veto of the next generation DarkSide-20k detector.

  9. Advanced Software Development Workstation Project

    NASA Technical Reports Server (NTRS)

    Lee, Daniel

    1989-01-01

    The Advanced Software Development Workstation Project, funded by Johnson Space Center, is investigating knowledge-based techniques for software reuse in NASA software development projects. Two prototypes have been demonstrated and a third is now in development. The approach is to build a foundation that provides passive reuse support, add a layer that uses domain-independent programming knowledge, add a layer that supports the acquisition of domain-specific programming knowledge to provide active support, and enhance maintainability and modifiability through an object-oriented approach. The development of new application software would use specification-by-reformulation, based on a cognitive theory of retrieval from very long-term memory in humans, and using an Ada code library and an object base. Current tasks include enhancements to the knowledge representation of Ada packages and abstract data types, extensions to support Ada package instantiation knowledge acquisition, integration with Ada compilers and relational databases, enhancements to the graphical user interface, and demonstration of the system with a NASA contractor-developed trajectory simulation package. Future work will focus on investigating issues involving scale-up and integration.

  10. Literacy Acquisition through Literature (Literacy Issues in Focus).

    ERIC Educational Resources Information Center

    Langer, Judith A.

    1997-01-01

    Discusses a project and study that focused on literacy acquisition among middle school students from the Dominican Republic attending a school on Manhattan's lower East Side. Describes how a book writing project focusing on "stories from home" engaged students, taught them ways to discuss and ways to think, and fostered their literacy acquisition…

  11. Teaching a Systems Approach: An Innovative Quality Improvement Project.

    PubMed

    Hamrin, Vanya; Vick, Rose; Brame, Cynthia; Simmons, Megan; Smith, Letizia; Vanderhoef, Dawn

    2016-04-01

    Nurse practitioners are required to navigate complex health care systems. Quality improvement (QI) projects provide the opportunity for nurse practitioner students to learn systems knowledge and improve health care outcomes in patient populations. A gap in the literature exists around how to systematically teach, apply, and measure QI curricular objectives at the master's level. Six faculty evaluated the QI project for the psychiatric nurse practitioner master's program by identifying the most challenging QI concepts for students to apply, revising their teaching strategies to address gaps, and retrospectively evaluating the outcomes of these curriculum changes by comparing student outcomes before and after the curricular changes. A significant difference was noted on QI project performance between students in the 2014 and 2015 graduating classes, measured by the scores earned on students' final papers (t[92] = 1.66, p = .05, d = .34, r(2) = .0289). Theoretical principles of adult and cooperative learning were used to inform curricular changes to enhance student's acquisition of QI skills. Copyright 2016, SLACK Incorporated.

  12. 49 CFR 1180.0 - Scope and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF TRANSPORTATION RULES OF PRACTICE RAILROAD ACQUISITION, CONTROL, MERGER, CONSOLIDATION PROJECT, TRACKAGE RIGHTS, AND LEASE PROCEDURES General Acquisition Procedures § 1180.0 Scope and purpose. (a... followed in control, merger, acquisition, lease, trackage rights, and any other consolidation transaction...

  13. System Matrix Analysis for Computed Tomography Imaging

    PubMed Central

    Flores, Liubov; Vidal, Vicent; Verdú, Gumersindo

    2015-01-01

    In practical applications of computed tomography imaging (CT), it is often the case that the set of projection data is incomplete owing to the physical conditions of the data acquisition process. On the other hand, the high radiation dose imposed on patients is also undesired. These issues demand that high quality CT images can be reconstructed from limited projection data. For this reason, iterative methods of image reconstruction have become a topic of increased research interest. Several algorithms have been proposed for few-view CT. We consider that the accurate solution of the reconstruction problem also depends on the system matrix that simulates the scanning process. In this work, we analyze the application of the Siddon method to generate elements of the matrix and we present results based on real projection data. PMID:26575482

  14. System and method for optical fiber based image acquisition suitable for use in turbine engines

    DOEpatents

    Baleine, Erwan; A V, Varun; Zombo, Paul J.; Varghese, Zubin

    2017-05-16

    A system and a method for image acquisition suitable for use in a turbine engine are disclosed. Light received from a field of view in an object plane is projected onto an image plane through an optical modulation device and is transferred through an image conduit to a sensor array. The sensor array generates a set of sampled image signals in a sensing basis based on light received from the image conduit. Finally, the sampled image signals are transformed from the sensing basis to a representation basis and a set of estimated image signals are generated therefrom. The estimated image signals are used for reconstructing an image and/or a motion-video of a region of interest within a turbine engine.

  15. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1984-01-01

    This publication provides reports on work performed for the Office of Space Tracking and Data Systems (OSTDS). It reports on the activities of the deep space network (DSN) and the Ground Communications Facility (GCF). Topics discussed on the operation of the DSN include: (1) spacecraft-ground communications; (2) station control and system technology; and (3) capabilities for new projects for systems implementation. The GCF compatibility with packets and data compression is discussed. In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements.

  16. Reinforced Concrete Beams under Combined Axial and Lateral Loading.

    DTIC Science & Technology

    1982-01-01

    NUMBER(s) Golden E. Lane, Jr. F29601-76-C-015 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT . PROJECT, TASK AREA 4 WORK UNIT NUMBERS New...acquisition system. The voltage output from the system’s digital multimeter was recorded on a floppy disk. The sampling rate was approximately two... samples per second for every channel. The same system was used to reduce and plot the data. TEST APPARATUS Figure 9 shows a schematic drawing of the load

  17. Fault-Tolerant Systems Technology Program Plan: A Concentrated, Prioritized, and Phased R&D Program is Proposed for the Development of the Technology.

    DTIC Science & Technology

    1977-08-01

    inadequacy of specifications, the undeveloped state of applicable techniques, and fragmentation of effort among disciplines. It recommends the development...of the technology and routine application to system acquisition. It describes major projects within the discipline and summarizes the state of the art...tolerance may be an unnecessary refinement in one application , merely desirable in a second, and essential in the third. In a mission-critical system

  18. System definition phase and acquisition phase project plan for Small Astronomy Satellite SAS-D

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The objective of the SAS-D project is to conduct spectral distribution studies of celestial ultraviolet sources using an Explorer-class spacecraft launched by a Delta vehicle into a geosynchronous orbit in the last half of 1975. The telescope system is intended for use by guest astronomers for a major portion of the total observing time. The concept of the overall system, designed to resemble functionally the operation of a ground-based observatory, should maximize the usefulness of the instrument to the astronomical community by limiting the amount of special instruction needed to use the spaceborne telescope. The SAS-D mission will obtain information on what stars, nebulae, and galaxies are and how they develop.

  19. The Department of the Navy Systems Engineering Career Competency Model (SECCM)

    DTIC Science & Technology

    2015-05-13

    Respond 71% Value 18% Organize 3% Characterize 4% Affective Domain Total KSAs : 869 ENG Career Field Competency Model 10 1.0 Mission Level...The Department of the Navy Systems Engineering Career Competency Model (SECCM) 2015 Acquisition Symposium Naval Postgraduate School Monterey...Career Competency Model (SECCM) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER

  20. Roadmap for the Hypersonics Programs of the Department of Defense

    DTIC Science & Technology

    2008-02-01

    development and integration of a 1MW e-bean system to provide the necessary energy into the wind tunnel flow field to enable longer duration experiments at...acquired. Finally, “Test and Evaluation” (T&E) is defined as tests and experiments in support of research development and acquisition of systems...Research Experimentation (HIFiRE) project, the DARPA/AF Falcon program, and the DoD Next Generation Launch planning activities. 13 Joint

  1. The Land Warrior Soldier System: A Case Study for the Acquisition of Soldier Systems

    DTIC Science & Technology

    2008-12-01

    demonstration projects (Montgomery, Godden, LaBerge & Wagner, 1994). The ASB ad-hoc study found that the then-recent SIPE demonstrations offered...Personal Navigation” by Peter Sherman and Steven Holmes, Draper Laboratory, Cambridge, Massachusetts, October 2005. U.S. Army Research Institute for...8217 perspective. [Interview with researchers]. Haley, R. L., Campbell, C. C., Holter, M. R., Shields, J., Godden, G. D., & LaBerge , W. B. (1991, December). Army

  2. Department of Defense Annual Report to Congress on Defense Acquisition Challenge Program for FY 2006

    DTIC Science & Technology

    2007-06-01

    Synthetic Instrument Measurement and Stimulus System – Improves aircraft avionics and electronic attack pod testing to expedite repair of critical...integration into CIWS • Navy requirement Cancelled / Not procured Air Force (4 Projects) • Quiet Eyes • On Aircraft (B-2) Laser Additive...System • Met Requirement/Rolled into FY07 Cost Effective Light Aircraft Missile Protect DAC for Army, Navy and Air Force helicopters • Did Not

  3. Inserting Agility in System Development

    DTIC Science & Technology

    2012-07-01

    Agile IT Acquisition, IT Box, Scrum Inserting Agility in System Development Matthew R. Kennedy and Lt Col Dan Ward, USAF With the fast-paced nature...1,700 individuals and 71 countries, found Scrum and eXtreme Programming to be the most widely followed method- ologies (VersionOne, 2007). Other...University http://www.dau.mil 259 Defense ARJ, July 2012, Vol. 19 No. 3 : 249–264 Scrum Scrum is a framework used for project management, which is

  4. A highly scalable information system as extendable framework solution for medical R&D projects.

    PubMed

    Holzmüller-Laue, Silke; Göde, Bernd; Stoll, Regina; Thurow, Kerstin

    2009-01-01

    For research projects in preventive medicine a flexible information management is needed that offers a free planning and documentation of project specific examinations. The system should allow a simple, preferably automated data acquisition from several distributed sources (e.g., mobile sensors, stationary diagnostic systems, questionnaires, manual inputs) as well as an effective data management, data use and analysis. An information system fulfilling these requirements has been developed at the Center for Life Science Automation (celisca). This system combines data of multiple investigations and multiple devices and displays them on a single screen. The integration of mobile sensor systems for comfortable, location-independent capture of time-based physiological parameter and the possibility of observation of these measurements directly by this system allow new scenarios. The web-based information system presented in this paper is configurable by user interfaces. It covers medical process descriptions, operative process data visualizations, a user-friendly process data processing, modern online interfaces (data bases, web services, XML) as well as a comfortable support of extended data analysis with third-party applications.

  5. Interdisciplinary Research at the Intersection of CALL, NLP, and SLA: Methodological Implications from an Input Enhancement Project

    ERIC Educational Resources Information Center

    Ziegler, Nicole; Meurers, Detmar; Rebuschat, Patrick; Ruiz, Simón; Moreno-Vega, José L.; Chinkina, Maria; Li, Wenjing; Grey, Sarah

    2017-01-01

    Despite the promise of research conducted at the intersection of computer-assisted language learning (CALL), natural language processing, and second language acquisition, few studies have explored the potential benefits of using intelligent CALL systems to deepen our understanding of the process and products of second language (L2) learning. The…

  6. Model for Evaluating the Cost Consequences of Deferring New System Acquisition Through Upgrades

    DTIC Science & Technology

    1999-07-01

    Analysis & Evaluation The Pentagon Washington, DC 20301 Attn: Mr. Eric Coulter, Director Projection Forces Division, Room 2E314 Lt Col Kathleen Conley...1034 Office of the Air National Guard ANG/AQM 5109 Leesburg Pike Skyline VI, Suite 302A Falls Church, VA 22041-3201 Attn: Col Brent Marler 1 Lt Col

  7. Examining Learning Styles and Perceived Benefits of Analogical Problem Construction on SQL Knowledge Acquisition

    ERIC Educational Resources Information Center

    Mills, Robert J.; Dupin-Bryant, Pamela A.; Johnson, John D.; Beaulieu, Tanya Y.

    2015-01-01

    The demand for Information Systems (IS) graduates with expertise in Structured Query Language (SQL) and database management is vast and projected to increase as "big data" becomes ubiquitous. To prepare students to solve complex problems in a data-driven world, educators must explore instructional strategies to help link prior knowledge…

  8. The Effect of Naming Systems on the Acquisition of and Reasoning about Time Concepts

    ERIC Educational Resources Information Center

    Liu, Nian

    2012-01-01

    Languages encode time-related concepts, like days of the week (DOW) and months of the year (MOY), in different ways. Some use numerical labels (e.g., in Chinese, Monday is "weekday one"; January is "month one") while others use arbitrary names (e.g., English). This project investigates whether languages that use numerical terms…

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agnes, P.; Albuquerque, I. F. M.; Alexander, T.

    The DarkSide-50 experiment at the Laboratori Nazionali del Gran Sasso is a search for dark matter using a dual phase time projection chamber with 50 kg of low radioactivity argon as target. Light signals from interactions in the argon are detected by a system of 38 photo-multiplier tubes (PMTs), 19 above and 19 below the TPC volume inside the argon cryostat. We describe the electronics which processes the signals from the photo-multipliers, the trigger system which identifies events of interest, and the data-acquisition system which records the data for further analysis. The electronics include resistive voltage dividers on the PMTs,more » custom pre-amplifiers mounted directly on the PMT voltage dividers in the liquid argon, and custom amplifier/discriminators (at room temperature). After amplification, the PMT signals are digitized in CAEN waveform digitizers, and CAEN logic modules are used to construct the trigger, the data acquisition system for the TPC is based on the Fermilab "artdaq" software. The system has been in operation since early 2014.« less

  10. Clinical nurse specialist education: actualizing the systems leadership competency.

    PubMed

    Thompson, Cathy J; Nelson-Marten, Paula

    2011-01-01

    The purpose of this article was to show how sequenced educational strategies aid in the acquisition of systems leadership and change agent skills, as well as other essential skills for professional clinical nurse specialist (CNS) practice. Clinical nurse specialist education offers the graduate student both didactic and clinical experiences to help the student transition into the CNS role. Clinical nurse specialist faculty have a responsibility to prepare students for the realities of advanced practice. Systems leadership is an integral competency of CNS practice. The contemporary CNS is to be a leader in the translation of evidence into practice. To assist students to acquire this competency, all CNS students are expected to use research and other sources of evidence to identify, design, implement, and evaluate a specific practice change. Anecdotal comments from students completing the projects are offered. Student projects have been focused in acute and critical care, palliative care, and adult/gerontologic health clinical settings; community outreach has been the focus of a few change projects. Examples of student projects related to the systems leadership competency and correlated to the spheres of influence impacted are presented.

  11. ORAC: 21st Century Observing at UKIRT

    NASA Astrophysics Data System (ADS)

    Bridger, A.; Wright, G. S.; Tan, M.; Pickup, D. A.; Economou, F.; Currie, M. J.; Adamson, A. J.; Rees, N. P.; Purves, M. H.

    The Observatory Reduction and Acquisition Control system replaces all of the existing software which interacts with the observers at UKIRT. The aim is to improve observing efficiency with a set of integrated tools that take the user from pre-observing preparation, through the acquisition of observations to the reduction using a data-driven pipeline. ORAC is designed to be flexible and extensible, and is intended for use with all future UKIRT instruments, as well as existing telescope hardware and ``legacy'' instruments. It is also designed to allow integration with phase-1 and queue-scheduled observing tools in anticipation of possible future requirements. A brief overview of the project and its relationship to other systems is given. ORAC also re-uses much code from other systems and we discuss issues relating to the trade-off between reuse and the generation of new software specific to our requirements.

  12. Digital breast tomosynthesis geometry calibration

    NASA Astrophysics Data System (ADS)

    Wang, Xinying; Mainprize, James G.; Kempston, Michael P.; Mawdsley, Gordon E.; Yaffe, Martin J.

    2007-03-01

    Digital Breast Tomosynthesis (DBT) is a 3D x-ray technique for imaging the breast. The x-ray tube, mounted on a gantry, moves in an arc over a limited angular range around the breast while 7-15 images are acquired over a period of a few seconds. A reconstruction algorithm is used to create a 3D volume dataset from the projection images. This procedure reduces the effects of tissue superposition, often responsible for degrading the quality of projection mammograms. This may help improve sensitivity of cancer detection, while reducing the number of false positive results. For DBT, images are acquired at a set of gantry rotation angles. The image reconstruction process requires several geometrical factors associated with image acquisition to be known accurately, however, vibration, encoder inaccuracy, the effects of gravity on the gantry arm and manufacturing tolerances can produce deviations from the desired acquisition geometry. Unlike cone-beam CT, in which a complete dataset is acquired (500+ projections over 180°), tomosynthesis reconstruction is challenging in that the angular range is narrow (typically from 20°-45°) and there are fewer projection images (~7-15). With such a limited dataset, reconstruction is very sensitive to geometric alignment. Uncertainties in factors such as detector tilt, gantry angle, focal spot location, source-detector distance and source-pivot distance can produce several artifacts in the reconstructed volume. To accurately and efficiently calculate the location and angles of orientation of critical components of the system in DBT geometry, a suitable phantom is required. We have designed a calibration phantom for tomosynthesis and developed software for accurate measurement of the geometric parameters of a DBT system. These have been tested both by simulation and experiment. We will present estimates of the precision available with this technique for a prototype DBT system.

  13. 75 FR 19168 - Federal Acquisition Regulation; FAR Case 2009-005, Use of Project Labor Agreements for Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... located on Indian reservations. Response: GSA, DoD, and NASA have clarified in the final rule that project... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: GSA, DOD, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to implement...

  14. Simulation Based Acquisition for NASA's Office of Exploration Systems

    NASA Technical Reports Server (NTRS)

    Hale, Joe

    2004-01-01

    In January 2004, President George W. Bush unveiled his vision for NASA to advance U.S. scientific, security, and economic interests through a robust space exploration program. This vision includes the goal to extend human presence across the solar system, starting with a human return to the Moon no later than 2020, in preparation for human exploration of Mars and other destinations. In response to this vision, NASA has created the Office of Exploration Systems (OExS) to develop the innovative technologies, knowledge, and infrastructures to explore and support decisions about human exploration destinations, including the development of a new Crew Exploration Vehicle (CEV). Within the OExS organization, NASA is implementing Simulation Based Acquisition (SBA), a robust Modeling & Simulation (M&S) environment integrated across all acquisition phases and programs/teams, to make the realization of the President s vision more certain. Executed properly, SBA will foster better informed, timelier, and more defensible decisions throughout the acquisition life cycle. By doing so, SBA will improve the quality of NASA systems and speed their development, at less cost and risk than would otherwise be the case. SBA is a comprehensive, Enterprise-wide endeavor that necessitates an evolved culture, a revised spiral acquisition process, and an infrastructure of advanced Information Technology (IT) capabilities. SBA encompasses all project phases (from requirements analysis and concept formulation through design, manufacture, training, and operations), professional disciplines, and activities that can benefit from employing SBA capabilities. SBA capabilities include: developing and assessing system concepts and designs; planning manufacturing, assembly, transport, and launch; training crews, maintainers, launch personnel, and controllers; planning and monitoring missions; responding to emergencies by evaluating effects and exploring solutions; and communicating across the OExS enterprise, within the Government, and with the general public. The SBA process features empowered collaborative teams (including industry partners) to integrate requirements, acquisition, training, operations, and sustainment. The SBA process also utilizes an increased reliance on and investment in M&S to reduce design risk. SBA originated as a joint Industry and Department of Defense (DoD) initiative to define and integrate an acquisition process that employs robust, collaborative use of M&S technology across acquisition phases and programs. The SBA process was successfully implemented in the Air Force s Joint Strike Fighter (JSF) Program.

  15. 44 CFR 80.17 - Project implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... encumbrances to the property must be extinguished before acquisition. (c) Purchase offer and supplemental... resulting in a National Flood Insurance Program (NFIP) claim of at least $5000. (2) For acquisition of...

  16. Advances in diffusion MRI acquisition and processing in the Human Connectome Project

    PubMed Central

    Sotiropoulos, Stamatios N; Jbabdi, Saad; Xu, Junqian; Andersson, Jesper L; Moeller, Steen; Auerbach, Edward J; Glasser, Matthew F; Hernandez, Moises; Sapiro, Guillermo; Jenkinson, Mark; Feinberg, David A; Yacoub, Essa; Lenglet, Christophe; Ven Essen, David C; Ugurbil, Kamil; Behrens, Timothy EJ

    2013-01-01

    The Human Connectome Project (HCP) is a collaborative 5-year effort to map human brain connections and their variability in healthy adults. A consortium of HCP investigators will study a population of 1200 healthy adults using multiple imaging modalities, along with extensive behavioral and genetic data. In this overview, we focus on diffusion MRI (dMRI) and the structural connectivity aspect of the project. We present recent advances in acquisition and processing that allow us to obtain very high-quality in-vivo MRI data, while enabling scanning of a very large number of subjects. These advances result from 2 years of intensive efforts in optimising many aspects of data acquisition and processing during the piloting phase of the project. The data quality and methods described here are representative of the datasets and processing pipelines that will be made freely available to the community at quarterly intervals, beginning in 2013. PMID:23702418

  17. Image acquisition optimization of a limited-angle intrafraction verification (LIVE) system for lung radiotherapy.

    PubMed

    Zhang, Yawei; Deng, Xinchen; Yin, Fang-Fang; Ren, Lei

    2018-01-01

    Limited-angle intrafraction verification (LIVE) has been previously developed for four-dimensional (4D) intrafraction target verification either during arc delivery or between three-dimensional (3D)/IMRT beams. Preliminary studies showed that LIVE can accurately estimate the target volume using kV/MV projections acquired over orthogonal view 30° scan angles. Currently, the LIVE imaging acquisition requires slow gantry rotation and is not clinically optimized. The goal of this study is to optimize the image acquisition parameters of LIVE for different patient respiratory periods and gantry rotation speeds for the effective clinical implementation of the system. Limited-angle intrafraction verification imaging acquisition was optimized using a digital anthropomorphic phantom (XCAT) with simulated respiratory periods varying from 3 s to 6 s and gantry rotation speeds varying from 1°/s to 6°/s. LIVE scanning time was optimized by minimizing the number of respiratory cycles needed for the four-dimensional scan, and imaging dose was optimized by minimizing the number of kV and MV projections needed for four-dimensional estimation. The estimation accuracy was evaluated by calculating both the center-of-mass-shift (COMS) and three-dimensional volume-percentage-difference (VPD) between the tumor in estimated images and the ground truth images. The robustness of LIVE was evaluated with varied respiratory patterns, tumor sizes, and tumor locations in XCAT simulation. A dynamic thoracic phantom (CIRS) was used to further validate the optimized imaging schemes from XCAT study with changes of respiratory patterns, tumor sizes, and imaging scanning directions. Respiratory periods, gantry rotation speeds, number of respiratory cycles scanned and number of kV/MV projections acquired were all positively correlated with the estimation accuracy of LIVE. Faster gantry rotation speed or longer respiratory period allowed less respiratory cycles to be scanned and less kV/MV projections to be acquired to estimate the target volume accurately. Regarding the scanning time minimization, for patient respiratory periods of 3-4 s, gantry rotation speeds of 1°/s, 2°/s, 3-6°/s required scanning of five, four, and three respiratory cycles, respectively. For patient respiratory periods of 5-6 s, the corresponding respiratory cycles required in the scan changed to four, three, and two cycles, respectively. Regarding the imaging dose minimization, for patient respiratory periods of 3-4 s, gantry rotation speeds of 1°/s, 2-4°/s, 5-6°/s required acquiring of 7, 5, 4 kV and MV projections, respectively. For patient respiratory periods of 5-6 s, 5 kV and 5 MV projections are sufficient for all gantry rotation speeds. The optimized LIVE system was robust against breathing pattern, tumor size and tumor location changes. In the CIRS study, the optimized LIVE system achieved the average center-of-mass-shift (COMS)/volume-percentage-difference (VPD) of 0.3 ± 0.1 mm/7.7 ± 2.0% for the scanning time priority case, 0.2 ± 0.1 mm/6.1 ± 1.2% for the imaging dose priority case, respectively, among all gantry rotation speeds tested. LIVE was robust against different scanning directions investigated. The LIVE system has been preliminarily optimized for different patient respiratory periods and treatment gantry rotation speeds using digital and physical phantoms. The optimized imaging parameters, including number of respiratory cycles scanned and kV/MV projection numbers acquired, provide guidelines for optimizing the scanning time and imaging dose of the LIVE system for its future evaluations and clinical implementations through patient studies. © 2017 American Association of Physicists in Medicine.

  18. Three-dimensional rotational micro-angiography

    NASA Astrophysics Data System (ADS)

    Patel, Vikas

    Computed tomography (CT) is state-of-the-art for 3D imaging in which images are acquired about the patient and are used to reconstruct the data. But the commercial CT systems suffer from low spatial resolution (0.5-2 lp/mm). Micro-CT (microCT) systems have high resolution 3D reconstruction (>10 lp/mm), but are currently limited to small objects, e.g., small animals. To achieve artifact free reconstructions, geometric calibration of the rotating-object cone-beam microCT (CBmicroCT) system is performed using new techniques that use only the projection images of the object, i.e., no calibration objects are required. Translations (up to 0.2 mm) occurring during the acquisition in the horizontal direction are detected, quantified, and corrected based on sinogram analysis. The parameters describing the physical axis of rotation determined using our image-based method (aligning anti-posed images) agree well (within 0.1 mm and 0.3 degrees) with those determined using other techniques that use calibration objects. Geometric calibrations of the rotational angiography (RA) systems (clinical cone-beam CT systems with fluoroscopic capabilities provided by flat-panel detectors (FPD)) are performed using a simple single projection technique (SPT), which aligns a known 3D model of a calibration phantom with the projection data. The calibration parameters obtained by the SPT are found to be reproducible (angles within 0.2° and x- and y-translations less than 2 mm) for over 7 months. The spatial resolution of the RA systems is found to be virtually unaffected by such small geometric variations. Finally, using our understanding of the geometric calibrations, we have developed methods to combine relatively low-resolution RA acquisitions (2-3 lp/mm) with high resolution microCT acquisitions (using a high-resolution micro-angiographic fluoroscope (MAF) attached to the RA gantry) to produce the first-ever 3D rotational micro-angiography (3D-RmicroA) system on a clinical gantry. Images of a rabbit with a coronary stent placed in an artery were obtained and reconstructed. To eliminate artifacts due to image truncation, lower-dose (compared to the MAF acquisition) full-FOV (FFOV) FPD RA sequences are also obtained. To ensure high-quality high-resolution reconstruction, the high-resolution images from the MAF are aligned spatially with the lower-dose FPD images (average correlation coefficient before and after alignment: 0.65 and 0.97 respectively), and the pixel values in the FPD image data are scaled (using linear regression) to match those of the MAF. Greater details without any visible truncation artifacts are seen in 3D RmicroA (MAF-FPD) images than in those of the FPD alone. The FWHM of line profiles of stent struts (100 micron diameter) are approximately 192 +/- 21 and 313 +/- 38 microns for the 3D RmicroA and FPD data, respectively. Thus, with the RmicroA system, we have essentially developed a high resolution CBmicroCT system for clinical use.

  19. Knowledge acquisition in the fuzzy knowledge representation framework of a medical consultation system.

    PubMed

    Boegl, Karl; Adlassnig, Klaus-Peter; Hayashi, Yoichi; Rothenfluh, Thomas E; Leitich, Harald

    2004-01-01

    This paper describes the fuzzy knowledge representation framework of the medical computer consultation system MedFrame/CADIAG-IV as well as the specific knowledge acquisition techniques that have been developed to support the definition of knowledge concepts and inference rules. As in its predecessor system CADIAG-II, fuzzy medical knowledge bases are used to model the uncertainty and the vagueness of medical concepts and fuzzy logic reasoning mechanisms provide the basic inference processes. The elicitation and acquisition of medical knowledge from domain experts has often been described as the most difficult and time-consuming task in knowledge-based system development in medicine. It comes as no surprise that this is even more so when unfamiliar representations like fuzzy membership functions are to be acquired. From previous projects we have learned that a user-centered approach is mandatory in complex and ill-defined knowledge domains such as internal medicine. This paper describes the knowledge acquisition framework that has been developed in order to make easier and more accessible the three main tasks of: (a) defining medical concepts; (b) providing appropriate interpretations for patient data; and (c) constructing inferential knowledge in a fuzzy knowledge representation framework. Special emphasis is laid on the motivations for some system design and data modeling decisions. The theoretical framework has been implemented in a software package, the Knowledge Base Builder Toolkit. The conception and the design of this system reflect the need for a user-centered, intuitive, and easy-to-handle tool. First results gained from pilot studies have shown that our approach can be successfully implemented in the context of a complex fuzzy theoretical framework. As a result, this critical aspect of knowledge-based system development can be accomplished more easily.

  20. Alicudi project

    NASA Astrophysics Data System (ADS)

    Arcidiacono, V.; Corsi, S.; Iliceto, A.; Previ, A.; Taschini, A.

    Design features and goals of the photovoltaic array power system for Alicudi Island hamlets are described. The array will have two 40 kWe sections, a 3 kAh battery system, an inverter to assure three-phase, ac current, a data acquisition system, and a 60 kVA diesel back-up system. The semi-arid conic volcanic island has terraces and a slope ideally suited to installation of the array. A computer simulation was developed to optimize the output and load profile matching using historical insolation data. A block diagram is provided of the electricity distribution network.

  1. Detection System of the First Rapidly Relocatable Tagged Neutron Inspection System (RRTNIS), Developed in the Framework of the European H2020 C-BORD Project

    NASA Astrophysics Data System (ADS)

    Fontana, Cristiano Lino; Carnera, Alberto; Lunardon, Marcello; Pino, Felix; Sada, Cinzia; Soramel, Francesca; Stevanato, Luca; Nebbia, Giancarlo; Carasco, Cédric; Perot, Bertrand; Sardet, Alix; Sannie, Guillaume; Iovene, Alessandro; Tintori, Carlo; Grodzicki, Krystian; Moszyński, Marek; Sibczyński, Paweł; Swiderski, Lukasz; Moretto, Sandra

    The European project entitled ;effective Container inspection at BORDer control points; (C-BORD) focuses on the development and in-situ tests of a comprehensive cost-effective solution for the generalized Non-Intrusive Inspection (NII) of containers and large-volume freight at the European Union (EU) border. It copes with a large range of targets, including explosives, chemical warfare agents, illicit drugs, tobacco and Special Nuclear Materials. Within the C-BORD project, a new generation of Tagged Neutron Inspection System (TNIS) for cargo containers is foreseen. Unlike its predecessors, this system would be the first Rapidly Relocatable TNIS (RRTNIS). It will be a second-line defense system, to be used on sealed containers in order to detect explosives, illicit drugs and chemical agents in a suspect voxel (elementary volume unit). We report on the status of the RRTNIS system, in particular the overall design, the characterization of the large-volume NaI(Tl) gamma detectors, the digital analysis of the time measurements and the Data Acquisition System (DAQ).

  2. Hardware Implementation of Multiple Fan Beam Projection Technique in Optical Fibre Process Tomography

    PubMed Central

    Rahim, Ruzairi Abdul; Fazalul Rahiman, Mohd Hafiz; Leong, Lai Chen; Chan, Kok San; Pang, Jon Fea

    2008-01-01

    The main objective of this project is to implement the multiple fan beam projection technique using optical fibre sensors with the aim to achieve a high data acquisition rate. Multiple fan beam projection technique here is defined as allowing more than one emitter to transmit light at the same time using the switch-mode fan beam method. For the thirty-two pairs of sensors used, the 2-projection technique and 4-projection technique are being investigated. Sixteen sets of projections will complete one frame of light emission for the 2-projection technique while eight sets of projection will complete one frame of light emission for the 4-projection technique. In order to facilitate data acquisition process, PIC microcontroller and the sample and hold circuit are being used. This paper summarizes the hardware configuration and design for this project. PMID:27879885

  3. Supplemental knowledge acquisition through external product interface for CLIPS

    NASA Technical Reports Server (NTRS)

    Saito, Tim; Ebaud, Stephen; Loftin, Bowen R.

    1990-01-01

    Traditionally, the acquisition of knowledge for expert systems consisted of the interview process with the domain or subject matter expert (SME), observation of domain environment, and information gathering and research which constituted a direct form of knowledge acquisition (KA). The knowledge engineer would be responsible for accumulating pertinent information and/or knowledge from the SME(s) for input into the appropriate expert system development tool. The direct KA process may (or may not) have included forms of data or documentation to incorporate from the SME's surroundings. The differentiation between direct KA and supplemental KA (indirect) would be the difference in the use of data. In acquiring supplemental knowledge, the knowledge engineer would access other types of evidence (manuals, documents, data files, spreadsheets, etc.) that would support the reasoning or premises of the SME. When an expert makes a decision in a particular task, one tool that may have been used to justify a recommendation, would have been a spreadsheet total or column figure. Locating specific decision points from that data within the SME's framework would constitute supplemental KA. Data used for a specific purpose in one system or environment would be used as supplemental knowledge for another, specifically a CLIPS project.

  4. 23 CFR 710.309 - Acquisition.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Acquisition. 710.309 Section 710.309 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.309 Acquisition. The process of acquiring real property includes...

  5. 32 CFR 644.5 - Mineral acquisition practices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Mineral acquisition practices. 644.5 Section 644.5 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.5 Mineral acquisition practices. (a...

  6. The Queued Service Observing Project at CFHT

    NASA Astrophysics Data System (ADS)

    Martin, Pierre; Savalle, Renaud; Vermeulen, Tom; Shapiro, Joshua N.

    2002-12-01

    In order to maximize the scientific productivity of the CFH12K mosaic wide-field imager (and soon MegaCam), the Queued Service Observing (QSO) mode was implemented at the Canada-France-Hawaii Telescope at the beginning of 2001. The QSO system consists of an ensemble of software components allowing for the submission of programs, the preparation of queues, and finally the execution and evaluation of observations. The QSO project is part of a broader system known as the New Observing Process (NOP). This system includes data acquisition, data reduction and analysis through a pipeline named Elixir, and a data archiving and distribution component (DADS). In this paper, we review several technical and operational aspects of the QSO project. In particular, we present our strategy, technical architecture, program submission system, and the tools developed for the preparation and execution of the queues. Our successful experience of over 150 nights of QSO operations is also discussed along with the future plans for queue observing with MegaCam and other instruments at CFHT.

  7. An Analysis of Current Operational Contract Support Planning Doctrine

    DTIC Science & Technology

    2015-09-01

    P). This project argues for the balanced development of OCS planning acquisition and non-acquisition focused resources to effectively integrate this...planning guidance developed is appropriate for initial entry operations applicable to various levels of theater maturity. 14. SUBJECT TERMS...balanced development of OCS planning acquisition and non- acquisition focused resources to effectively integrate this function across disciplines. The

  8. The Open AUC Project.

    PubMed

    Cölfen, Helmut; Laue, Thomas M; Wohlleben, Wendel; Schilling, Kristian; Karabudak, Engin; Langhorst, Bradley W; Brookes, Emre; Dubbs, Bruce; Zollars, Dan; Rocco, Mattia; Demeler, Borries

    2010-02-01

    Progress in analytical ultracentrifugation (AUC) has been hindered by obstructions to hardware innovation and by software incompatibility. In this paper, we announce and outline the Open AUC Project. The goals of the Open AUC Project are to stimulate AUC innovation by improving instrumentation, detectors, acquisition and analysis software, and collaborative tools. These improvements are needed for the next generation of AUC-based research. The Open AUC Project combines on-going work from several different groups. A new base instrument is described, one that is designed from the ground up to be an analytical ultracentrifuge. This machine offers an open architecture, hardware standards, and application programming interfaces for detector developers. All software will use the GNU Public License to assure that intellectual property is available in open source format. The Open AUC strategy facilitates collaborations, encourages sharing, and eliminates the chronic impediments that have plagued AUC innovation for the last 20 years. This ultracentrifuge will be equipped with multiple and interchangeable optical tracks so that state-of-the-art electronics and improved detectors will be available for a variety of optical systems. The instrument will be complemented by a new rotor, enhanced data acquisition and analysis software, as well as collaboration software. Described here are the instrument, the modular software components, and a standardized database that will encourage and ease integration of data analysis and interpretation software.

  9. Real-Time Data Display

    NASA Technical Reports Server (NTRS)

    Pedings, Marc

    2007-01-01

    RT-Display is a MATLAB-based data acquisition environment designed to use a variety of commercial off-the-shelf (COTS) hardware to digitize analog signals to a standard data format usable by other post-acquisition data analysis tools. This software presents the acquired data in real time using a variety of signal-processing algorithms. The acquired data is stored in a standard Operator Interactive Signal Processing Software (OISPS) data-formatted file. RT-Display is primarily configured to use the Agilent VXI (or equivalent) data acquisition boards used in such systems as MIDDAS (Multi-channel Integrated Dynamic Data Acquisition System). The software is generalized and deployable in almost any testing environment, without limitations or proprietary configuration for a specific test program or project. With the Agilent hardware configured and in place, users can start the program and, in one step, immediately begin digitizing multiple channels of data. Once the acquisition is completed, data is converted into a common binary format that also can be translated to specific formats used by external analysis software, such as OISPS and PC-Signal (product of AI Signal Research Inc.). RT-Display at the time of this reporting was certified on Agilent hardware capable of acquisition up to 196,608 samples per second. Data signals are presented to the user on-screen simultaneously for 16 channels. Each channel can be viewed individually, with a maximum capability of 160 signal channels (depending on hardware configuration). Current signal presentations include: time data, fast Fourier transforms (FFT), and power spectral density plots (PSD). Additional processing algorithms can be easily incorporated into this environment.

  10. United States Air Force Computer-Aided Acquisition and Logistics Support (CALS) Evolution of Computer Integrated Manufacturing (CIM) Technologies

    DTIC Science & Technology

    1988-11-01

    Manufacturing System 22 4. Similar Parts Based Shape or Manufactuting Process 24 5. Projected Annual Unit Robot Sales and Installed Base Through 1992 30 6. U.S...effort needed to perform personnel, product design, marketing , and advertising, and finance tasks of the firm. Level III controls the resource...planning and accounting functions of the firm. Systems at this level support purchasing, accounts payable, accounts receivable, master scheduling and sales

  11. Breadboard stellar tracker system test report, volume 1

    NASA Technical Reports Server (NTRS)

    Kollodge, J. C.; Hubbard, M. W.; Jain, S.; Schons, C. A.

    1981-01-01

    The performance of a star tracker equipped with a focal plane detector was evaluated. The CID board is an array of 256 x 256 pixels which are 20 x 20 micrometers in dimension. The tracker used for test was a breadboard tracker system developed by BASD. Unique acquisition and tracking algorithms are employed to enhance performance. A pattern recognition process is used to test for proper image spread function and to avoid false acquisition on noise. A very linear, high gain, interpixel transfer function is derived for interpolating star position. The lens used in the tracker has an EFL of 100 mm. The tracker has an FOV of 2.93 degrees resulting in a pixel angular subtense of 41.253 arc sec in each axis. The test procedure used for the program presented a star to the tracker in a circular pattern of positions; the pattern was formed by projecting a simulated star through a rotatable deviation wedge. Further tests determined readout noise, Noise Equivalent Displacement during track, and spatial noise during acquisition by taking related data and reducing it.

  12. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2011-01-01

    The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.

  13. U.S. Tsunami Information technology (TIM) Modernization:Developing a Maintainable and Extensible Open Source Earthquake and Tsunami Warning System

    NASA Astrophysics Data System (ADS)

    Hellman, S. B.; Lisowski, S.; Baker, B.; Hagerty, M.; Lomax, A.; Leifer, J. M.; Thies, D. A.; Schnackenberg, A.; Barrows, J.

    2015-12-01

    Tsunami Information technology Modernization (TIM) is a National Oceanic and Atmospheric Administration (NOAA) project to update and standardize the earthquake and tsunami monitoring systems currently employed at the U.S. Tsunami Warning Centers in Ewa Beach, Hawaii (PTWC) and Palmer, Alaska (NTWC). While this project was funded by NOAA to solve a specific problem, the requirements that the delivered system be both open source and easily maintainable have resulted in the creation of a variety of open source (OS) software packages. The open source software is now complete and this is a presentation of the OS Software that has been funded by NOAA for benefit of the entire seismic community. The design architecture comprises three distinct components: (1) The user interface, (2) The real-time data acquisition and processing system and (3) The scientific algorithm library. The system follows a modular design with loose coupling between components. We now identify the major project constituents. The user interface, CAVE, is written in Java and is compatible with the existing National Weather Service (NWS) open source graphical system AWIPS. The selected real-time seismic acquisition and processing system is open source SeisComp3 (sc3). The seismic library (libseismic) contains numerous custom written and wrapped open source seismic algorithms (e.g., ML/mb/Ms/Mwp, mantle magnitude (Mm), w-phase moment tensor, bodywave moment tensor, finite-fault inversion, array processing). The seismic library is organized in a way (function naming and usage) that will be familiar to users of Matlab. The seismic library extends sc3 so that it can be called by the real-time system, but it can also be driven and tested outside of sc3, for example, by ObsPy or Earthworm. To unify the three principal components we have developed a flexible and lightweight communication layer called SeismoEdex.

  14. The Systems Approach to Assessment and Evaluation of Post-Secondary Vocational Education Programs. Final Report. October 1, 1976-June 30, 1978.

    ERIC Educational Resources Information Center

    Hartz, John D.

    A project was conducted to improve the employability and employment prospects for students by (1) identifying non-job task skills and characteristics important to job acquisition and retention, (2) constructing an instrument to assess the identified skills and characteristics, (3) pilot testing the instrument with graduates from two postsecondary…

  15. Agile Mythbusting

    DTIC Science & Technology

    2015-01-01

    0321502752 Coaching Agile Teams Lyssa Adkins ISBN #0321637704 Agile Project Management : Creating Innovative Products – Second Edition Jim Highsmith ISBN...Picatinny Arsenal Lapham, Wrubel Jan 2015 © 2015 Carnegie Mellon University. DoD Acquisition and Innovation Many regulated environments, like the DoD...NEED innovation and NEED incremental improvements to their systems. Many of them are now willing to consider changing their approach if they can do it

  16. Controlling CAMAC instrumentation through the USB port

    NASA Astrophysics Data System (ADS)

    Ribas, R. V.

    2012-02-01

    A programmable device to interface CAMAC instrumentation to the USB port of computers, without the need of heavy, noisy and expensive CAMAC crates is described in this article. Up to four single-width modules can be used. Also, all software necessary for a multi-parametric data acquisition system was developed. A standard crate-controller based on the same project is being designed.

  17. Acquisition of Computer Literacy Skills through Self-Organizing Systems of Learning among Children in Bhutan and India

    ERIC Educational Resources Information Center

    Mitra, Sugata; Dangwal, Ritu

    2017-01-01

    This article describes a study under the Reaching the Unreached component of the Chiphen Rigpel project between the governments of Bhutan and India. This initiative is an attempt to provide computer literacy to children of Bhutan through setting up "hole in the wall" (HiWEL) Playground Learning Station(s) (PLSs). The study described here…

  18. An Investigation of Privately Financed Renewable Energy Projects for Army Installations

    DTIC Science & Technology

    1990-09-01

    PURPA ) restrictions, current Internal Revenue Service (IRS) rulings, and the expiration of Federal tax credits were identified. Task 3: Innovative...palatable to the policymakers. Existing legislation, including Federal acquisition regulations, PURPA restrictions, and existing tax laws, while not...discourage the application of renewable energy systems. The PURPA rules are undergoing evaluation. Although the effect of the FederalEnergy Regulating

  19. Software Assurance Curriculum Project Volume 2: Undergraduate Course Outlines

    DTIC Science & Technology

    2010-08-01

    Contents Acknowledgments iii Abstract v 1 An Undergraduate Curriculum Focus on Software Assurance 1 2 Computer Science I 7 3 Computer Science II...confidence that can be integrated into traditional software development and acquisition process models . Thus, in addition to a technology focus...testing throughout the software development life cycle ( SDLC ) AP Security and complexity—system development challenges: security failures

  20. Screen Channel Liquid Acquisition Devices for Cryogenic Propellants

    NASA Technical Reports Server (NTRS)

    Chato, David J.; Kudlac, Maureen T.

    2005-01-01

    This paper describes an on-going project to study the application screen channel liquid acquisition devices to cryogenic propellant systems. The literature of screen liquid acquisition devices is reviewed for prior cryogenic experience. Test programs and apparatus are presented to study these devices. Preliminary results are shown demonstrating bubble points for 200 x 1400 wires per inch and 325 x 2300 wires per inch Dutch twill screens. The 200 x 1400 screen has a bubble point of 15.8 inches of water in isopropyl alcohol and 6.6 inches of water in liquid nitrogen. The 325 x 2300 screen has a bubble point of 24.5 inches of water in isopropyl alcohol, 10.7 inches of water in liquid nitrogen, and 1.83 inches of water in liquid hydrogen. These values are found to be in good agreement with the results reported in the literature.

  1. Meta-tools for software development and knowledge acquisition

    NASA Technical Reports Server (NTRS)

    Eriksson, Henrik; Musen, Mark A.

    1992-01-01

    The effectiveness of tools that provide support for software development is highly dependent on the match between the tools and their task. Knowledge-acquisition (KA) tools constitute a class of development tools targeted at knowledge-based systems. Generally, KA tools that are custom-tailored for particular application domains are more effective than are general KA tools that cover a large class of domains. The high cost of custom-tailoring KA tools manually has encouraged researchers to develop meta-tools for KA tools. Current research issues in meta-tools for knowledge acquisition are the specification styles, or meta-views, for target KA tools used, and the relationships between the specification entered in the meta-tool and other specifications for the target program under development. We examine different types of meta-views and meta-tools. Our current project is to provide meta-tools that produce KA tools from multiple specification sources--for instance, from a task analysis of the target application.

  2. As-built design specification for P1A software system modified display subsystem

    NASA Technical Reports Server (NTRS)

    Horton, C. L.; Story, A. S. (Principal Investigator)

    1980-01-01

    This document contains the design of the proportional estimate processor which was written to satisfy the software requirement of Part A of the P1A experiment. The purposes of the project are: (1) to select the dots to be labelled; (2) to create tables of green numbers and brightness values for all selected dots per acquisition; (3) to create scatter plots of green numbers vs brightness for each acquisition for all selected dots. If labels have been provided then scatter plots of only categories of interest can be optionally produced; and (4) to produce trajectory plots of green number vs brightness at differing acquisition times for each dot. These plots need to be in the same order as the list of selected dots. When labels are provided only plots of dots of categories of interest are to be produced.

  3. Intelligent Systems for Self-Healing Electronics

    NASA Technical Reports Server (NTRS)

    Latino, Carl D.

    2001-01-01

    For long duration missions it is imperative to be able to monitor and record critical information. The data acquisition systems used must therefore be fault tolerant. This usually meant having redundant copies of critical channels. Since each channel usually consists of various components, the parts count, cost, weight and complexity of the system could be very high. The Advanced Data Acquisition System (ADAS) has been developed as a proof of concept. The purpose was to demonstrate an architecture where individual spare parts can replace defective ones to repair a channel. By so doing entire channels do not need replication. This reduces the need of total redundancy and reduces the parts count. This has the added feature that in addition to spare parts, good components of a failed channel can be used as spares in another channel. In addition to reducing parts count and cost, this configuration, with an intelligent decision maker, can improve the reliability of the overall system. Another unique feature of ADAS is that it uses reconfigurable analog filters. These components can be programmed, by the smart system to meet the specific needs of the part they are to replace. This way one part can serve as spare for many different components. The hardware was built and now serves as a platform for developing intelligent algorithms. Another related project was a wireless data acquisition system. I was invited to participate in the meetings and issue suggestions. A brief description of this system will also be included.

  4. Sensory System for Implementing a Human—Computer Interface Based on Electrooculography

    PubMed Central

    Barea, Rafael; Boquete, Luciano; Rodriguez-Ascariz, Jose Manuel; Ortega, Sergio; López, Elena

    2011-01-01

    This paper describes a sensory system for implementing a human–computer interface based on electrooculography. An acquisition system captures electrooculograms and transmits them via the ZigBee protocol. The data acquired are analysed in real time using a microcontroller-based platform running the Linux operating system. The continuous wavelet transform and neural network are used to process and analyse the signals to obtain highly reliable results in real time. To enhance system usability, the graphical interface is projected onto special eyewear, which is also used to position the signal-capturing electrodes. PMID:22346579

  5. Coast Guard: Opportunities Exist to Further Improve Acquisition Management Capabilities

    DTIC Science & Technology

    2011-04-01

    Coast Guard’s significant acquisition challenges, including project challenges in its Deepwater program. GAO’s prior work on the Coast Guard...to defense readiness. We have reported extensively on the Coast Guard’s significant acquisition challenges, including its Deepwater program, which...prior work on the Deepwater acquisition program identified problems in costs, management, and oversight that have led to delivery delays and other

  6. TELECOMMUNICATIONS. GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Program

    DTIC Science & Technology

    2002-04-01

    Reform, House of RepresentativesApril 2002 TELECOMMUNICATIONS GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Programa GAO-02...Needed to Realize Benefits of Metropolitan Area Acquisition Program Contract Number Grant Number Program Element Number Author(s) Project Number...TELECOMMUNICATIONS GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Program This is a test for developing highlights for a GAO report

  7. 23 CFR 710.203 - Funding and reimbursement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... property except as provided in § 710.501 for early acquisition: (1) The project for which the real property... and hardship acquisition; and in 23 CFR 710.501, early acquisition. Appraisal completion may be...) Costs have been incurred in conformance with State and Federal law requirements. (b) Direct eligible...

  8. Reengineering the Acquisition/Procurement Process: A Methodology for Requirements Collection

    NASA Technical Reports Server (NTRS)

    Taylor, Randall; Vanek, Thomas

    2011-01-01

    This paper captures the systematic approach taken by JPL's Acquisition Reengineering Project team, the methodology used, challenges faced, and lessons learned. It provides pragmatic "how-to" techniques and tools for collecting requirements and for identifying areas of improvement in an acquisition/procurement process or other core process of interest.

  9. Software Acquisition Process (SWAP) Model FY81

    DTIC Science & Technology

    1982-12-01

    experience. In addition, the manpower accounting techniques and the effects of resource limitation are described below. a. Contractor Personnel. Five job...developed are each oriented to a specific type of developmental activity. Between them, they account for all types of activities in the acquisition...manning levels and duration; Decision Box probability; and project staffing levels. They take into account the overall size of the project and the

  10. The structure of control and data transfer management system for the GAMMA-400 scientific complex

    NASA Astrophysics Data System (ADS)

    Arkhangelskiy, A. I.; Bobkov, S. G.; Serdin, O. V.; Gorbunov, M. S.; Topchiev, N. P.

    2016-02-01

    A description of the control and data transfer management system for scientific instrumentation involved in the GAMMA-400 space project is given. The technical capabilities of all specialized equipment to provide the functioning of the scientific instrumentation and satellite support systems are unified in a single structure. Control of the scientific instruments is maintained using one-time pulse radio commands, as well as program commands in the form of 16-bit code words, which are transmitted via onboard control system and scientific data acquisition system. Up to 100 GByte of data per day can be transferred to the ground segment of the project. The correctness of the proposed and implemented structure, engineering solutions and electronic elemental base selection has been verified by the experimental working-off of the prototype of the GAMMA-400 scientific complex in laboratory conditions.

  11. 32 CFR 644.1 - Preface.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... scheduling for the acquisition of lands in connection with Military and Civil Works projects. It is not... and potential problems are fully considered in planning for the acquisition of additional lands...

  12. SU-C-9A-04: Alternative Analytic Solution to the Paralyzable Detector Model to Calculate Deadtime and Deadtime Loss

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siman, W; Kappadath, S

    2014-06-01

    Purpose: Some common methods to solve for deadtime are (1) dual-source method, which assumes two equal activities; (2) model fitting, which requires multiple acquisitions as source decays; and (3) lossless model, which assumes no deadtime loss at low count rates. We propose a new analytic alternative solution to calculate deadtime for paralyzable gamma camera. Methods: Deadtime T can be calculated analytically from two distinct observed count rates M1 and M2 when the ratio of the true count rates alpha=N2/N1 is known. Alpha can be measured as a ratio of two measured activities using dose calibrators or via radioactive decay. Knowledgemore » of alpha creates a system with 2 equations and 2 unknowns, i.e., T and N1. To verify the validity of the proposed method, projections of a non-uniform phantom (4GBq 99mTc) were acquired in using Siemens SymbiaS multiple times over 48 hours. Each projection has >100kcts. The deadtime for each projection was calculated by fitting the data to a paralyzable model and also by using the proposed 2-acquisition method. The two estimates of deadtime were compared using the Bland-Altmann method. In addition, the dependency of uncertainty in T on uncertainty in alpha was investigated for several imaging conditions. Results: The results strongly suggest that the 2-acquisition method is equivalent to the fitting method. The Bland-Altman analysis yielded mean difference in deadtime estimate of ∼0.076us (95%CI: -0.049us, 0.103us) between the 2-acquisition and model fitting methods. The 95% limits of agreement were calculated to be -0.104 to 0.256us. The uncertainty in deadtime calculated using the proposed method is highly dependent on the uncertainty in the ratio alpha. Conclusion: The 2-acquisition method was found to be equivalent to the parameter fitting method. The proposed method offers a simpler and more practical way to analytically solve for a paralyzable detector deadtime, especially during physics testing.« less

  13. Gruppeorganiseret og selvstyret fremmedsprogstilegnelse. Et undervisningseksperiment pa RUC [and] Skolesprogene. Om fremmedsprogenes status og funktion i gymnasiet. ROLIG Papir 22 (Group Organized and Self Managed Foreign Language Acquisition. A Research Project at RUC [and] School Languages. On the Status and Function of Foreign Languages in Secondary Schools. ROLIG Paper 22).

    ERIC Educational Resources Information Center

    Jakobsen, Karen Sonne

    Two articles highlight different issues on foreign language learning and instruction in Denmark. The first article describes a research project at Roskilde University Center that focuses on group organized and self managed foreign language acquisition. The idea for the project came about as a result of concern over problems related to foreign…

  14. 24 CFR 241.1000 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... the owner of an eligible multifamily project to capture a portion of the project's equity, in...

  15. Solar Resource & Meteorological Assessment Project (SOLRMAP): Observed Atmospheric and Solar Information System (OASIS); Tucson, Arizona (Data)

    DOE Data Explorer

    Wilcox, S.; Andreas, A.

    2010-11-03

    The U.S. Department of Energy's National Renewable Energy Laboratory collaborates with the solar industry to establish high quality solar and meteorological measurements. This Solar Resource and Meteorological Assessment Project (SOLRMAP) provides high quality measurements to support deployment of power projects in the United States. The no-funds-exchanged collaboration brings NREL solar resource assessment expertise together with industry needs for measurements. The end result is high quality data sets to support the financing, design, and monitoring of large scale solar power projects for industry in addition to research-quality data for NREL model development. NREL provides consultation for instrumentation and station deployment, along with instrument calibrations, data acquisition, quality assessment, data distribution, and summary reports. Industry participants provide equipment, infrastructure, and station maintenance.

  16. Development of a naming convention and data ma nagement system

    NASA Technical Reports Server (NTRS)

    Mcnider, Richard T.; Botts, Michael; Moss, Don; Conover, Helen; Criswell, Evan; Graves, Sara; Hardin, Danny

    1993-01-01

    This contract covered work in data management, acquisition, and analysis for the Earth Science and Applications Division (ESAD) of the Space Science Laboratory of MSFC. Under this contract, a naming convention and data management system were developed for ESAD data sets, data visualization, and standard data format issues were investigated, and specific data analysis and management needs were addressed for several ESAD projects and data sets. In the following sections, details of the research performed over the duration of this contract are summarized.

  17. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2005-04-21

    6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research...between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. Several Members...premature” a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics

  18. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2005-06-24

    6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research...competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. The...competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s

  19. Navy DD(X), GC(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2005-08-18

    5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) David D. Acker Library and Knowledge...System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. The Emergency Supplemental Appropriations Act...take-all competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build

  20. Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2006-03-07

    PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service The...New Orleans and a third facility at Gulfport, MS, form Northrop Grumman’s Ship Systems ( NGSS ) division. The Navy has not procured any frigates since...the program, it had decided to award the contract for the next phase on a sole-source basis to Northrop Grumman’s Ship Systems ( NGSS ) division, which

  1. Problems in the Multi-Service Acquisition of Less-Than-Major Ground Communications-Electronics Systems.

    DTIC Science & Technology

    1981-06-01

    eucation about nsiti-serviue program, especially at higher levels 1 1 2 4 Other 2 1 1 4 ,! provisioning. Two interviewees mentioned the need for a cost...generator project. Also, the Program Manager was only a Lieutenant Colonel. Colonel Haney felt that a higher [ I. rank would be required since the... higher than for the military in both services in all three categories. Table 3-4 illustrates average years of experience by system studied. Again

  2. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  3. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  4. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  5. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  6. 25 CFR 700.3 - Assurances with respect to acquisition and displacement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Assurances with respect to acquisition and displacement... displacement. The Commission will not approve any programs or projects which may result in the acquisition of habitations and/or improvements, or in the displacement of any person, until such time as written assurances...

  7. Satellite-based monitoring of grassland: assessment of harvest dates and frequency using SAR

    NASA Astrophysics Data System (ADS)

    Siegmund, R.; Grant, K.; Wagner, M.; Hartmann, S.

    2016-10-01

    Grasslands are among the largest ecosystems worldwide and according to the FAO they contribute to the livelihoods of more than 800 million people. Harvest dates and frequency can be utilised for an improved estimation of grassland yields. In the presented project a highly automatised methodology for detecting harvest dates and frequency using SARamplitude data was developed based on an amplitude change detection techniques. This was achieved by evaluating spatial statistics over field boundaries provided by the European Integrated Administration and Control System (IACS) to identify changes between pre- and post-harvest acquisitions. The combination of this method with a grassland yield model will result in more reliable and regional-wide numbers of grassland yields. In our contribution we will focus on SAR-remote sensing for monitoring harvest frequencies, discuss the requirements concerning the acquisition system, present the technical approach and analyse the verified results. In terms of the acquisition system a high temporal acquisition rate is required, which is generally met by using SARsatellite constellations providing a revisit time of few days. COSMO-SkyMed data were utilised for the pilot study for developing and prototyping a monitoring system. Subsequently the approach was adapted to the use of the C-Band system Sentinel-1A becoming fully operational with the availability of Sentinal-1B. The study area is situated northeast of Munich, Germany, extending to an area of approx. 40km to 40km and covering major verification sites and in-situ data provided by research farms or continuously surveyed in-situ campaigns. An extended time series of SAR data was collected during the cultivation and vegetation cycles between March 2014 and March 2016. All data were processed and harmonised in a GIS database to be analysed and verified according to corresponding in-situ data.

  8. Information and image integration: project spectrum

    NASA Astrophysics Data System (ADS)

    Blaine, G. James; Jost, R. Gilbert; Martin, Lori; Weiss, David A.; Lehmann, Ron; Fritz, Kevin

    1998-07-01

    The BJC Health System (BJC) and the Washington University School of Medicine (WUSM) formed a technology alliance with industry collaborators to develop and implement an integrated, advanced clinical information system. The industry collaborators include IBM, Kodak, SBC and Motorola. The activity, called Project Spectrum, provides an integrated clinical repository for the multiple hospital facilities of the BJC. The BJC System consists of 12 acute care hospitals serving over one million patients in Missouri and Illinois. An interface engine manages transactions from each of the hospital information systems, lab systems and radiology information systems. Data is normalized to provide a consistent view for the primary care physician. Access to the clinical repository is supported by web-based server/browser technology which delivers patient data to the physician's desktop. An HL7 based messaging system coordinates the acquisition and management of radiological image data and sends image keys to the clinical data repository. Access to the clinical chart browser currently provides radiology reports, laboratory data, vital signs and transcribed medical reports. A chart metaphor provides tabs for the selection of the clinical record for review. Activation of the radiology tab facilitates a standardized view of radiology reports and provides an icon used to initiate retrieval of available radiology images. The selection of the image icon spawns an image browser plug-in and utilizes the image key from the clinical repository to access the image server for the requested image data. The Spectrum system is collecting clinical data from five hospital systems and imaging data from two hospitals. Domain specific radiology imaging systems support the acquisition and primary interpretation of radiology exams. The spectrum clinical workstations are deployed to over 200 sites utilizing local area networks and ISDN connectivity.

  9. Design and performance of the KSC Biomass Production Chamber

    NASA Technical Reports Server (NTRS)

    Prince, Ralph P.; Knott, William M.; Sager, John C.; Hilding, Suzanne E.

    1987-01-01

    NASA's Controlled Ecological Life Support System program has instituted the Kennedy Space Center 'breadboard' project of which the Biomass Production Chamber (BPC) presently discussed is a part. The BPC is based on a modified hypobaric test vessel; its design parameters and operational parameters have been chosen in order to meet a wide range of plant-growing objectives aboard future spacecraft on long-duration missions. A control and data acquisition subsystem is used to maintain a common link between the heating, ventilation, and air conditioning system, the illumination system, the gas-circulation system, and the nutrient delivery and monitoring subsystems.

  10. Serial data acquisition for the X-ray plasma diagnostics with selected GEM detector structures

    NASA Astrophysics Data System (ADS)

    Czarski, T.; Chernyshova, M.; Pozniak, K. T.; Kasprowicz, G.; Zabolotny, W.; Kolasinski, P.; Krawczyk, R.; Wojenski, A.; Zienkiewicz, P.

    2015-10-01

    The measurement system based on GEM—Gas Electron Multiplier detector is developed for X-ray diagnostics of magnetic confinement tokamak plasmas. The paper is focused on the measurement subject and describes the fundamental data processing to obtain reliable characteristics (histograms) useful for physicists. The required data processing have two steps: 1—processing in the time domain, i.e. events selections for bunches of coinciding clusters, 2—processing in the planar space domain, i.e. cluster identification for the given detector structure. So, it is the software part of the project between the electronic hardware and physics applications. The whole project is original and it was developed by the paper authors. The previous version based on 1-D GEM detector was applied for the high-resolution X-ray crystal spectrometer KX1 in the JET tokamak. The current version considers 2-D detector structures for the new data acquisition system. The fast and accurate mode of data acquisition implemented in the hardware in real time can be applied for the dynamic plasma diagnostics. Several detector structures with single-pixel sensors and multi-pixel (directional) sensors are considered for two-dimensional X-ray imaging. Final data processing is presented by histograms for selected range of position, time interval and cluster charge values. Exemplary radiation source properties are measured by the basic cumulative characteristics: the cluster position distribution and cluster charge value distribution corresponding to the energy spectra. A shorter version of this contribution is due to be published in PoS at: 1st EPS conference on Plasma Diagnostics

  11. Forensic characterization of camcorded movies: digital cinema vs. celluloid film prints

    NASA Astrophysics Data System (ADS)

    Rolland-Nevière, Xavier; Chupeau, Bertrand; Do"rr, Gwena"l.; Blondé, Laurent

    2012-03-01

    Digital camcording in the premises of cinema theaters is the main source of pirate copies of newly released movies. To trace such recordings, watermarking systems are exploited in order for each projection to be unique and thus identifiable. The forensic analysis to recover these marks is different for digital and legacy cinemas. To avoid running both detectors, a reliable oracle discriminating between cams originating from analog or digital projections is required. This article details a classification framework relying on three complementary features : the spatial uniformity of the screen illumination, the vertical (in)stability of the projected image, and the luminance artifacts due to the interplay between the display and acquisition devices. The system has been tuned with cams captured in a controlled environment and benchmarked against a medium-sized dataset (61 samples) composed of real-life pirate cams. Reported experimental results demonstrate that such a framework yields over 80% classification accuracy.

  12. LUNA: low-flying UAV-based forest monitoring system

    NASA Astrophysics Data System (ADS)

    Keizer, Jan Jacob; Pereira, Luísa; Pinto, Glória; Alves, Artur; Barros, Antonio; Boogert, Frans-Joost; Cambra, Sílvia; de Jesus, Cláudia; Frankenbach, Silja; Mesquita, Raquel; Serôdio, João; Martins, José; Almendra, Ricardo

    2015-04-01

    The LUNA project is aiming to develop an information system for precision forestry and, in particular, the monitoring of eucalypt plantations that is first and foremost based on multi-spectral imagery acquired using low-flying uav's. The presentation will focus on the first phase of image acquisition, processing and analysis for a series of pot experiments addressing main threats for early-stage eucalypt plantations in Portugal, i.e. acute , chronic and cyclic hydric stress, nutrient stress, fungal infections and insect plague attacks. The imaging results will be compared with spectroscopic measurements as well as with eco-physiological and plant morphological measurements. Furthermore, the presentation will show initial results of the project's second phase, comprising field tests in existing eucalypt plantations in north-central Portugal.

  13. "Click Here to Order This Book": A Case Study of Print and Electronic Patron-Driven Acquisition in University College Dublin

    ERIC Educational Resources Information Center

    Tynan, Mark; McCarney, Eoin

    2014-01-01

    University College Dublin became the first library in the Republic of Ireland to trial patron-driven acquisition (PDA) as a collection development tool in 2013. A total of 42% of UCD Library's book budget was allocated to the project, which included both electronic and print books. This article describes the twelve month project from the tender…

  14. Comparative power law analysis of structured breast phantom and patient images in digital mammography and breast tomosynthesis.

    PubMed

    Cockmartin, L; Bosmans, H; Marshall, N W

    2013-08-01

    This work characterizes three candidate mammography phantoms with structured background in terms of power law analysis in the low frequency region of the power spectrum for 2D (planar) mammography and digital breast tomosynthesis (DBT). The study was performed using three phantoms (spheres in water, Voxmam, and BR3D CIRS phantoms) on two DBT systems from two different vendors (Siemens Inspiration and Hologic Selenia Dimensions). Power spectra (PS) were calculated for planar projection, DBT projection, and reconstructed images and curve fitted in the low frequency region from 0.2 to 0.7 mm(-1) with a power law function characterized by an exponent β and magnitude κ. The influence of acquisition dose and tube voltage on the power law parameters was first explored. Then power law parameters were calculated from images acquired with the same anode∕filter combination and tube voltage for the three test objects, and compared with each other. Finally, PS curves for automatic exposure controlled acquisitions (anode∕filter combination and tube voltages selected by the systems based on the breast equivalent thickness of the test objects) were compared against PS analysis performed on patient data (for Siemens 80 and for Hologic 48 mammograms and DBT series). Dosimetric aspects of the three test objects were also examined. The power law exponent (β) was found to be independent of acquisition dose for planar mammography but varied more for DBT projections of the sphere-phantom. Systematic increase of tube voltage did not affect β but decreased κ, both in planar and DBT projection phantom images. Power spectra of the BR3D phantom were closer to those of the patients than these of the Voxmam phantom; the Voxmam phantom gave high values of κ compared to the other phantoms and the patient series. The magnitude of the PS curves of the BR3D phantom was within the patient range but β was lower than the average patient value. Finally, PS magnitude for the sphere-phantom coincided with the patient curves for Siemens but was lower for the Hologic system. Close agreement of doses for all three phantoms with patient doses was found. Power law parameters of the phantoms were close to those of the patients but no single phantom matched in terms of both magnitude (κ) and texture (β) for the x-ray systems in this work. PS analysis of structured phantoms is feasible and this methodology can be used to suggest improvements in phantom design.

  15. Landsat analysis of lake quality

    NASA Technical Reports Server (NTRS)

    Scarpace, F. L.; Fisher, L. T.; Holmquist, K. W.

    1979-01-01

    The trophic status of a number of inland lakes in Wisconsin has been assessed. The feasibility of using both photographic and digital representations of Landsat imagery was investigated during the lake classification project. The result of the investigation has been a semi-automatic data acquisition and handling system which, in conjunction with an analytical categorization scheme, can be used to classify all the significant lakes in the state.

  16. Performance Based Logistics: Optimizing Total System Availability and Reducing Program Cost

    DTIC Science & Technology

    2011-03-14

    MONITOR’S REPORT Dr. Paul C. Jussel NUMBER(S) U.S. Army War College 12. DISTRIBUTION / AVAILABILITY STATEMENT Distribution Statement A...Colonel David M. Kaczmarski United States Army Dr. Paul C. Jussel Project Adviser This CRP is submitted in...8911927-1.html# (accessed 10 November 2010) 2 Hurst, Dana . Performance Based Logistics – A Bridge Between Acquisition Reform and Logistics Supply

  17. 2008 Maneuver Support Science and Technology Conference and Exhibition

    DTIC Science & Technology

    2008-07-30

    Web Boeing 707 Civilian Nuclear PowerHyman G. Rickover KC-135 Nautilus SSN 571 ~ 1954 ~ 1955 1960’s DDG 1000 “Electric Navy” AMSC - 50,000 SHP ...Systems Integration? “The Project Manager shall have a comprehensive plan for HSI in place early in the acquisition process to optimize...Applications research for specific military problems • Components, subsystems, models, new concepts • Understanding to solve

  18. A comprehensive data acquisition and management system for an ecosystem-scale peatland warming and elevated CO2 experiment

    NASA Astrophysics Data System (ADS)

    Krassovski, M. B.; Riggs, J. S.; Hook, L. A.; Nettles, W. R.; Hanson, P. J.; Boden, T. A.

    2015-07-01

    Ecosystem-scale manipulation experiments represent large science investments that require well-designed data acquisition and management systems to provide reliable, accurate information to project participants and third party users. The SPRUCE Project (Spruce and Peatland Responses Under Climatic and Environmental Change, http://mnspruce.ornl.gov) is such an experiment funded by the Department of Energy's (DOE), Office of Science, Terrestrial Ecosystem Science (TES) Program. The SPRUCE experimental mission is to assess ecosystem-level biological responses of vulnerable, high carbon terrestrial ecosystems to a range of climate warming manipulations and an elevated CO2 atmosphere. SPRUCE provides a platform for testing mechanisms controlling the vulnerability of organisms, biogeochemical processes, and ecosystems to climatic change (e.g., thresholds for organism decline or mortality, limitations to regeneration, biogeochemical limitations to productivity, the cycling and release of CO2 and CH4 to the atmosphere). The SPRUCE experiment will generate a wide range of continuous and discrete measurements. To successfully manage SPRUCE data collection, achieve SPRUCE science objectives, and support broader climate change research, the research staff has designed a flexible data system using proven network technologies and software components. The primary SPRUCE data system components are: 1. Data acquisition and control system - set of hardware and software to retrieve biological and engineering data from sensors, collect sensor status information, and distribute feedback to control components. 2. Data collection system - set of hardware and software to deliver data to a central depository for storage and further processing. 3. Data management plan - set of plans, policies, and practices to control consistency, protect data integrity, and deliver data. This publication presents our approach to meeting the challenges of designing and constructing an efficient data system for managing high volume sources of in-situ observations in a remote, harsh environmental location. The approach covers data flow starting from the sensors and ending at the archival/distribution points, discusses types of hardware and software used, examines design considerations that were used to choose them, and describes the data management practices chosen to control and enhance the value of the data.

  19. A comprehensive data acquisition and management system for an ecosystem-scale peatland warming and elevated CO2 experiment

    NASA Astrophysics Data System (ADS)

    Krassovski, M. B.; Riggs, J. S.; Hook, L. A.; Nettles, W. R.; Hanson, P. J.; Boden, T. A.

    2015-11-01

    Ecosystem-scale manipulation experiments represent large science investments that require well-designed data acquisition and management systems to provide reliable, accurate information to project participants and third party users. The SPRUCE project (Spruce and Peatland Responses Under Climatic and Environmental Change, http://mnspruce.ornl.gov) is such an experiment funded by the Department of Energy's (DOE), Office of Science, Terrestrial Ecosystem Science (TES) Program. The SPRUCE experimental mission is to assess ecosystem-level biological responses of vulnerable, high carbon terrestrial ecosystems to a range of climate warming manipulations and an elevated CO2 atmosphere. SPRUCE provides a platform for testing mechanisms controlling the vulnerability of organisms, biogeochemical processes, and ecosystems to climatic change (e.g., thresholds for organism decline or mortality, limitations to regeneration, biogeochemical limitations to productivity, and the cycling and release of CO2 and CH4 to the atmosphere). The SPRUCE experiment will generate a wide range of continuous and discrete measurements. To successfully manage SPRUCE data collection, achieve SPRUCE science objectives, and support broader climate change research, the research staff has designed a flexible data system using proven network technologies and software components. The primary SPRUCE data system components are the following: 1. data acquisition and control system - set of hardware and software to retrieve biological and engineering data from sensors, collect sensor status information, and distribute feedback to control components; 2. data collection system - set of hardware and software to deliver data to a central depository for storage and further processing; 3. data management plan - set of plans, policies, and practices to control consistency, protect data integrity, and deliver data. This publication presents our approach to meeting the challenges of designing and constructing an efficient data system for managing high volume sources of in situ observations in a remote, harsh environmental location. The approach covers data flow starting from the sensors and ending at the archival/distribution points, discusses types of hardware and software used, examines design considerations that were used to choose them, and describes the data management practices chosen to control and enhance the value of the data.

  20. Development of high-rise buildings: digitalization of life cycle management

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  1. Building a multidisciplinary team for burn treatment - Lessons learned from the Montreal tendon transfer experience.

    PubMed

    Karam, E; Lévesque, M C; Jacquemin, G; Delure, A; Robidoux, I; Laramée, M T; Odobescu, A; Harris, P G; Danino, A M

    2014-03-31

    Multidisciplinary teams (MDTs) represent a recognized component of care in the treatment of complex conditions such as burns. However, most institutions do not provide adequate support for the formation of these teams. Furthermore, the majority of specialists lack the managerial skills required to create a team and have difficulties finding the proper tools. Our objective is to provide an insight for health care professionals, who wish to form a MDT for burn treatment, on the challenges that are likely to be faced, and to identify key elements that may facilitate the establishment of such a project. The setting for this was a plastic surgery department and rehabilitation center at a national reference center. A qualitative analysis was performed on all correspondences related to our tetraplegia project, from 2006 to 2008. To guide our thematic analysis, we used a form of systems theory known as the complexity theory. The qualitative analysis was performed using the NVivo software (Version 8.0 QSR International Melbourne, Australia). Lastly, the data was organized in chronologic order. Three main themes emerged from the results: knowledge acquisition, project organizational setup and project steps design. These themes represented respectively 24%, 50% and 26% of all correspondences. Project steps design and knowledge acquisition correspondences increased significantly after the introduction of the mentor team to our network. We conclude that an early association with a mentor team is beneficial for the establishment of a MDT.

  2. 3D image acquisition by fiber-based fringe projection

    NASA Astrophysics Data System (ADS)

    Pfeifer, Tilo; Driessen, Sascha

    2005-02-01

    In macroscopic production processes several measuring methods are used to assure the quality of 3D parts. Definitely, one of the most widespread techniques is the fringe projection. It"s a fast and accurate method to receive the topography of a part as a computer file which can be processed in further steps, e.g. to compare the measured part to a given CAD file. In this article it will be shown how the fringe projection method is applied to a fiber-optic system. The fringes generated by a miniaturized fringe projector (MiniRot) are first projected onto the front-end of an image guide using special optics. The image guide serves as a transmitter for the fringes in order to get them onto the surface of a micro part. A second image guide is used to observe the micro part. It"s mounted under an angle relating to the illuminating image guide so that the triangulation condition is fulfilled. With a CCD camera connected to the second image guide the projected fringes are recorded and those data is analyzed by an image processing system.

  3. Converging Redundant Sensor Network Information for Improved Building Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale Tiller; D. Phil; Gregor Henze

    2007-09-30

    This project investigated the development and application of sensor networks to enhance building energy management and security. Commercial, industrial and residential buildings often incorporate systems used to determine occupancy, but current sensor technology and control algorithms limit the effectiveness of these systems. For example, most of these systems rely on single monitoring points to detect occupancy, when more than one monitoring point could improve system performance. Phase I of the project focused on instrumentation and data collection. During the initial project phase, a new occupancy detection system was developed, commissioned and installed in a sample of private offices and open-planmore » office workstations. Data acquisition systems were developed and deployed to collect data on space occupancy profiles. Phase II of the project demonstrated that a network of several sensors provides a more accurate measure of occupancy than is possible using systems based on single monitoring points. This phase also established that analysis algorithms could be applied to the sensor network data stream to improve the accuracy of system performance in energy management and security applications. In Phase III of the project, the sensor network from Phase I was complemented by a control strategy developed based on the results from the first two project phases: this controller was implemented in a small sample of work areas, and applied to lighting control. Two additional technologies were developed in the course of completing the project. A prototype web-based display that portrays the current status of each detector in a sensor network monitoring building occupancy was designed and implemented. A new capability that enables occupancy sensors in a sensor network to dynamically set the 'time delay' interval based on ongoing occupant behavior in the space was also designed and implemented.« less

  4. The GSN Data Quality Initiative

    NASA Astrophysics Data System (ADS)

    Davis, J. P.; Anderson, K. R.; Gee, L. S.

    2010-12-01

    The Global Seismographic Network (GSN) is undertaking a renewed effort to assess and assure data quality that builds upon completion of the major installation phase of the GSN and recent funding to recapitalize most of the network’s equipment including data acquisition systems, ancillary equipment and secondary sensors. We highlight here work by the network operators, the USGS’ Albuquerque Seismological Lab and UCSD’s Project IDA, to ensure that both the quality of the waveforms collected is maximized, that the published metadata accurately reflect the instrument response of the data acquisitions systems, and that data users are informed of the status of the GSN data quality. Procedures to evaluate waveform quality blend tools made available through the IRIS DMC’s Quality Analysis Control Kit (http://www.iris.washington.edu/QUACK/), analysis results provided by the Lamont Waveform Quality Center (www.ldeo.columbia.edu/~ekstrom/Projects/WQC.html), and custom software developed by each of the operators to identify and track known hardware failure modes. Each operator’s equipment upgrade schedule is updated periodically to address sensors identified as failing or problematic and for which replacements are available. Particular attention is also paid to monitoring the GPS clock signal to guarantee that the data are timed properly. Devices based on GPS technology unavailable when the GSN began 25 years ago are being integrated into operations to verify sensor orientations. Portable, broadband seismometers whose stable response can be verified in the laboratory are now co-located with GSN sensors during field visits to verify the existing GSN sensors’ sensitivity. Additional effort is being made to analyze past calibration signals and to check the system response functions of the secondary broadband sensors at GSN sites. The new generation of data acquisition systems will enable relative calibrations to be performed more frequently than was possible in the past. Additional details of this effort can be found at the GSN Quality webpage (www.iris.edu/hq/programs/gsn/quality).

  5. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  6. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  7. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  8. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  9. Accurate low-dose iterative CT reconstruction from few projections by Generalized Anisotropic Total Variation minimization for industrial CT.

    PubMed

    Debatin, Maurice; Hesser, Jürgen

    2015-01-01

    Reducing the amount of time for data acquisition and reconstruction in industrial CT decreases the operation time of the X-ray machine and therefore increases the sales. This can be achieved by reducing both, the dose and the pulse length of the CT system and the number of projections for the reconstruction, respectively. In this paper, a novel generalized Anisotropic Total Variation regularization for under-sampled, low-dose iterative CT reconstruction is discussed and compared to the standard methods, Total Variation, Adaptive weighted Total Variation and Filtered Backprojection. The novel regularization function uses a priori information about the Gradient Magnitude Distribution of the scanned object for the reconstruction. We provide a general parameterization scheme and evaluate the efficiency of our new algorithm for different noise levels and different number of projection views. When noise is not present, error-free reconstructions are achievable for AwTV and GATV from 40 projections. In cases where noise is simulated, our strategy achieves a Relative Root Mean Square Error that is up to 11 times lower than Total Variation-based and up to 4 times lower than AwTV-based iterative statistical reconstruction (e.g. for a SNR of 223 and 40 projections). To obtain the same reconstruction quality as achieved by Total Variation, the projection number and the pulse length, and the acquisition time and the dose respectively can be reduced by a factor of approximately 3.5, when AwTV is used and a factor of approximately 6.7, when our proposed algorithm is used.

  10. Configuration Management Process Assessment Strategy

    NASA Technical Reports Server (NTRS)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  11. 77 FR 44045 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-60; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... the United States Defense Advanced Research Projects Agency (DARPA) to the list of agencies that have... taxation of Government cost-reimbursement contracts when contractors and their subcontractors purchase...

  12. Three-dimensional digitizer for the footwear industry

    NASA Astrophysics Data System (ADS)

    Gonzalez, Francisco; Campoy, Pascual; Aracil, Rafael; Penafiel, Francisco; Sebastian, Jose M.

    1993-12-01

    This paper presents a developed system for digitizing 3D objects in the footwear industry (e.g. mould, soles, heels) and their introduction in a CAD system for further manipulation and production of rapid prototypes. The system is based on the acquisition of the sequence of images of the projection of a laser line onto the 3D object when this is moving in front of the laser beam and the camera. This beam projection lights a 3D curve on the surface of the object, whose image is processed in order to obtain the 3D coordinates of every point of mentioned curve according to a previous calibration of the system. These coordinates of points in all the curves are analyzed and combined in order to make up a 3D wire-frame model of the object, which is introduced in a CAD station for further design and connection to the machinery for rapid prototyping.

  13. Design of the Wind Tunnel Model Communication Controller Board. Degree awarded by Christopher Newport Univ. on Dec. 1998

    NASA Technical Reports Server (NTRS)

    Wilson, William C.

    1999-01-01

    The NASA Langley Research Center's Wind Tunnel Reinvestment project plans to shrink the existing data acquisition electronics to fit inside a wind tunnel model. Space limitations within a model necessitate a distributed system of Application Specific Integrated Circuits (ASICs) rather than a centralized system based on PC boards. This thesis will focus on the design of the prototype of the communication Controller board. A portion of the communication Controller board is to be used as the basis of an ASIC design. The communication Controller board will communicate between the internal model modules and the external data acquisition computer. This board is based around an Field Programmable Gate Array (FPGA), to allow for reconfigurability. In addition to the FPGA, this board contains buffer Random Access Memory (RAM), configuration memory (EEPROM), drivers for the communications ports, and passive components.

  14. Control and Data Acquisition for the Spherical Tokamak MEDUSA-CR

    NASA Astrophysics Data System (ADS)

    Soto, Christian; Gonzalez, Jeferson; Carvajal, Johan; Ribeiro, Celso

    2013-10-01

    The former spherical tokamak (ST) MEDUSA (Madison EDUcation Small Aspect.ratio tokamak, R < 0.14 m, a < 0.10 m, BT < 0.5 T, Ip < 40 kA, 3 ms pulse) is being recommissioned in Costa Rica Institute of Technology. The main objectives of the MEDUSA-CR project are training and to clarify several issues in relevant physics for conventional and mainly STs, including beta studies in bean-shaped ST plasmas, transport, heating and current drive via Alfvén wave, and natural divertor STs with ergodic magnetic limiter. We present here the control and data acquisition systems for MEDUSA-CR device which are based on National Instruments (NI) software (LabView) and hardware on loan to our laboratory via NI-Costa Rica. The interface with the energy, gas fueling, and security systems are also presented. VIE-ITCR, IAEA-CRP contract 17592, National Instruments of Costa Rica.

  15. A combined positron emission tomography (PET)-electron paramagnetic resonance imaging (EPRI) system: initial evaluation of a prototype scanner

    NASA Astrophysics Data System (ADS)

    Tseytlin, Mark; Stolin, Alexander V.; Guggilapu, Priyaankadevi; Bobko, Andrey A.; Khramtsov, Valery V.; Tseytlin, Oxana; Raylman, Raymond R.

    2018-05-01

    The advent of hybrid scanners, combining complementary modalities, has revolutionized the application of advanced imaging technology to clinical practice and biomedical research. In this project, we investigated the melding of two complementary, functional imaging methods: positron emission tomography (PET) and electron paramagnetic resonance imaging (EPRI). PET radiotracers can provide important information about cellular parameters, such as glucose metabolism. While EPR probes can provide assessment of tissue microenvironment, measuring oxygenation and pH, for example. Therefore, a combined PET/EPRI scanner promises to provide new insights not attainable with current imagers by simultaneous acquisition of multiple components of tissue microenvironments. To explore the simultaneous acquisition of PET and EPR images, a prototype system was created by combining two existing scanners. Specifically, a silicon photomultiplier (SiPM)-based PET scanner ring designed as a portable scanner was combined with an EPRI scanner designed for the imaging of small animals. The ability of the system to obtain simultaneous images was assessed with a small phantom consisting of four cylinders containing both a PET tracer and EPR spin probe. The resulting images demonstrated the ability to obtain contemporaneous PET and EPR images without cross-modality interference. Given the promising results from this initial investigation, the next step in this project is the construction of the next generation pre-clinical PET/EPRI scanner for multi-parametric assessment of physiologically-important parameters of tissue microenvironments.

  16. The Unification of Space Qualified Integrated Circuits by Example of International Space Project GAMMA-400

    NASA Astrophysics Data System (ADS)

    Bobkov, S. G.; Serdin, O. V.; Arkhangelskiy, A. I.; Arkhangelskaja, I. V.; Suchkov, S. I.; Topchiev, N. P.

    The problem of electronic component unification at the different levels (circuits, interfaces, hardware and software) used in space industry is considered. The task of computer systems for space purposes developing is discussed by example of scientific data acquisition system for space project GAMMA-400. The basic characteristics of high reliable and fault tolerant chips developed by SRISA RAS for space applicable computational systems are given. To reduce power consumption and enhance data reliability, embedded system interconnect made hierarchical: upper level is Serial RapidIO 1x or 4x with rate transfer 1.25 Gbaud; next level - SpaceWire with rate transfer up to 400 Mbaud and lower level - MIL-STD-1553B and RS232/RS485. The Ethernet 10/100 is technology interface and provided connection with the previously released modules too. Systems interconnection allows creating different redundancy systems. Designers can develop heterogeneous systems that employ the peer-to-peer networking performance of Serial RapidIO using multiprocessor clusters interconnected by SpaceWire.

  17. Advanced Distributed Measurements and Data Processing at the Vibro-Acoustic Test Facility, GRC Space Power Facility, Sandusky, Ohio - an Architecture and an Example

    NASA Technical Reports Server (NTRS)

    Hill, Gerald M.; Evans, Richard K.

    2009-01-01

    A large-scale, distributed, high-speed data acquisition system (HSDAS) is currently being installed at the Space Power Facility (SPF) at NASA Glenn Research Center s Plum Brook Station in Sandusky, OH. This installation is being done as part of a facility construction project to add Vibro-acoustic Test Capabilities (VTC) to the current thermal-vacuum testing capability of SPF in support of the Orion Project s requirement for Space Environments Testing (SET). The HSDAS architecture is a modular design, which utilizes fully-remotely managed components, enables the system to support multiple test locations with a wide-range of measurement types and a very large system channel count. The architecture of the system is presented along with details on system scalability and measurement verification. In addition, the ability of the system to automate many of its processes such as measurement verification and measurement system analysis is also discussed.

  18. The Roland Maze Project — Cosmic Ray Registration at Schools

    NASA Astrophysics Data System (ADS)

    Feder, J.; JȨDRZEJCZAK, K.; Karczmarczyk, J.; Lewandowski, R.; Swarzyński, J.; Szabelska, B.; Szabelski, J.; Tokarski, P.; Wibig, T.

    Experimental studies of cosmic rays at the highest energies (above 1018 eV) are the main scientific goal of the projected large area network of extensive air shower detectors. Placing the detectors on the roofs of high school buildings will lower the cost by using the existing urban infrastructure (INTERNET, power supply, etc.), and can be a very efficient way of science popularisation by engaging high school students in the research program. 30 high schools in Łódź are already involved in the project. The project has recently obtained some financial support from the City Council of Łódź. The donation enabled us to start experimental work on detector construction details. A cycle of lectures and seminars devoted to different aspects of project realization (detector construction, on-line data acquisition system, C++ programming) has been organized for students at our Institute and at schools.

  19. Energy Keepers Incorporated, U.S. Department of Energy Tribal Energy Program Award #DE-EE0005040 Final Report December 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillin, Charmel; Lipscomb, Brian

    This project aimed at supporting one key component of a major multi-step undertaking on the part of the CSKT: the acquisition of the Kerr Hydroelectric project and its subsequent operation as a wholesale power generation facility. This project provided support to kick-start the development of the organizational structure to acquire and operate the facility by acquiring critical expertise necessary for the acquisition by funding in part two key personnel for the first two years of the four-year organizational development process. These individuals provided the Tribes with expert knowledge in the highly specialized areas of resource balancing, power marketing, and hydro-engineering;more » essential prerequisites to the Tribes' ability to build an organization for the operation of the Kerr Project and to securing financial backing for the acquisition. Goals achieved:   • Establishing an efficient and economic conveyance process, and transition plans • Establishing an efficient and effective Tribal wholesale power generation corporation to manage the plant, balance the resources, and market the power from the Kerr Project. The success of this project, which is essential to the Tribes' acquisition of the Kerr Hydroelectric facility, helps to address poverty and unemployment among Tribal members by generating a number of highly skilled and specialized, high-paying Tribal member jobs and providing a stream of income from power sales that will be used for Tribal economic development. Objectives achieved: The project supported the position of Power Plant Operations and Maintenance engineer and power marketing coordinator positions. These are key, in part, to the Tribes' successful acquisition and operation of the facility because they will enable to the Tribes to gain the very specialized expertise required to operate a large wholesale power generation facility. Specific objectives include: Objective 1: Hire a power marketing coordinator to develop and coordinate the appropriate power marketing strategy for the sale of power generated by the operation of Kerr Dam. Objective 2: Hire a staff engineer.« less

  20. S-1 project. Volume I. Architecture. 1979 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-01-01

    The US Navy is one of the world's largest users of digital computing equipment having a procurement cost of at least $50,000, and is the single largest such computer customer in the Department of Defense. Its projected acquisition plan for embedded computer systems during the first half of the 80s contemplates the installation of over 10,000 such systems at an estimated cost of several billions of dollars. This expenditure, though large, is dwarfed by the 85 billion dollars which DOD is projected to spend during the next half-decade on computer software, the near-majority of which will be spent by themore » Navy; the life-cycle costs of the 700,000+ lines of software for a single large Navy weapons systems application (e.g., AEGIS) have been conservatively estimated at most of a billion dollars. The S-1 Project is dedicated to realizing potentially large improvements in the efficiency with which such very large sums may be spent, so that greater military effectiveness may be secured earlier, and with smaller expenditures. The fundamental objectives of the S-1 Project's work are first to enable the Navy to be able to quickly, reliably and inexpensively evaluate at any time what is available from the state-of-the-art in digital processing systems and what the relevance of such systems may be to Navy data processing applications: and second to provide reference prototype systems to support possible competitive procurement action leading to deployment of such systems.« less

Top