An Approach for Evaluating the Technical Quality of Interim Assessments
ERIC Educational Resources Information Center
Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian
2010-01-01
Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…
ERIC Educational Resources Information Center
Immekus, Jason C.; Atitya, Ben
2016-01-01
Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…
PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY TH
The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less
ERIC Educational Resources Information Center
Behr, Shirley K.; And Others
The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...
Radon Reduction Techniques in Schools: Interim Technical Guidance.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC.
This technical document is intended to assist school facilities maintenance personnel in the selection, design, and operation of radon reduction systems in schools. The guidance contained in this document is based largely on research conducted in 1987 and 1988 in schools located in Maryland and Virginia. Researchers from the United States…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kriger, A.
1978-01-31
This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. Amore » technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives.« less
Transportation Systems Center Bibliography of Technical Reports, July 1970 - December 1976,
1977-04-01
Systems Center. AD-733-763 Judith Gertler, Herbert Glynn, Vivian Hobbs, Frederick Interim Report. June 1971. 16p. Woolfall. AD-733-764 Air Traffic Control...of Deployment Cost Analysis .. .......... FAA-76-20 Airspace Control Environmnent Simulator - Final Report.... ............ .. TSC-131.3 *All- Wether
Functions and requirements document for interim store solidified high-level and transuranic waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith-Fewell, M.A., Westinghouse Hanford
1996-05-17
The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less
Parameter identification for nonlinear aerodynamic systems
NASA Technical Reports Server (NTRS)
Pearson, Allan E.
1993-01-01
This final technical report covers a three and one-half year period preceding February 28, 1993 during which support was provided under NASA Grant NAG-1-1065. Following a general description of the system identification problem and a brief survey of methods to attack it, the basic ideas behind the approach taken in this research effort are presented. The results obtained are described with reference to the published work, including the five semiannual progress reports previously submitted and two interim technical reports.
Progress and future direction for the interim safe storage and disposal of Hanford high-level waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.
This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less
A Real-Time Systems Symposium Preprint.
1983-09-01
Real - Time Systems Symposium Preprint Interim Tech...estimate of the occurence of the error. Unclassii ledSECUqITY CLASSIF’ICA T" NO MI*IA If’ inDI /’rrd erter for~~ble. ’Corrputnqg A REAL - TIME SYSTEMS SYMPOSIUM...ABSTRACT This technical report contains a preprint of a paper accepted for presentation at the REAL - TIME SYSTEMS SYMPOSIUM, Arlington,
Institutional Effectiveness Summary Report, 2001.
ERIC Educational Resources Information Center
Burless, Bridget
This document discusses institutional effectiveness at Florence-Darlington Technical College (FDTC) (South Carolina) for the 2000-2001 academic year. Full and/or interim report summaries are provided for advising procedures, library resources, and for the following departments: Accounting, Automated Office, Office Systems Technology, Health Care…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chung, D.; Ascanio, X.
1996-05-01
The Department of Energy has issued a technical standard for long-term (>50 years) storage and will soon issue a criteria document for interim (<20 years) storage of plutonium materials. The long-term technical standard, {open_quotes}Criteria for Safe Storage of Plutonium Metals and Oxides,{close_quotes} addresses the requirements for storing metals and oxides with greater than 50 wt % plutonium. It calls for a standardized package that meets both off-site transportation requirements, as well as remote handling requirements from future storage facilities. The interim criteria document, {open_quotes}Criteria for Interim Safe Storage of Plutonium-Bearing Solid Materials{close_quotes}, addresses requirements for storing materials with less thanmore » 50 wt% plutonium. The interim criteria document assumes the materials will be stored on existing sites, and existing facilities and equipment will be used for repackaging to improve the margin of safety.« less
75 FR 13680 - Commutation of Sentence: Technical Change
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... Sentence: Technical Change AGENCY: Bureau of Prisons, Justice. ACTION: Interim rule. SUMMARY: This document makes a minor technical change to the Bureau of Prisons (Bureau) regulations on sentence commutation to.... Commutation of Sentence: Technical Change This document makes a minor technical change to the Bureau...
Army Systems Engineering Career Development Model
2014-01-30
Army Systems Engineering Career Development Model Interim Technical Report SERC -2014-TR-042-1 January 30, 2014 Principal Investigators Dr. Val...Gavito, Stevens Institute of Technology Dr. Michael Pennotti, Stevens Institute of Technology Task Order 004, RT 104 Report No. SERC -2014-TR-042-1...Institute of Technology 8. PERFORMING ORGANIZATION REPORT NUMBER SERC -2014-TR-042-1 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) DASD
24 CFR 115.209 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Technical assistance. 115.209... Substantially Equivalent Agencies § 115.209 Technical assistance. (a) The Assistant Secretary, through the FHEO regional office, may provide technical assistance to the interim and certified agencies at any time. The...
7 CFR 652.4 - Technical service standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must approve all new technologies and innovative practices, including interim standards and specifications, prior to a TSP initiating technical services for those technologies and practices. (c) A TSP must...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1978-01-31
This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunctionmore » with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.« less
ERIC Educational Resources Information Center
Shute, Valerie J.
Aptitude-treatment interactions (ATIs) refer to the covariation between learner characteristic and instructional treatment in relation to some outcome measure. To systematically test for ATI, an intelligent tutoring system instructing in basic principles of electricity was chosen as a complex but controlled learning task. Two learning environments…
ERIC Educational Resources Information Center
Filinger, Ronald H.; Hall, Paul W.
Because large scale individualized learning systems place excessive demands on conventional means of producing audiovisual software, electronic image generation has been investigated as an alternative. A prototype, experimental device, Scanimate-500, was designed and built by the Computer Image Corporation. It uses photographic, television, and…
75 FR 77721 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-47; Introduction
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-13
...-019 Morgan. Self-Certification (Interim). V Uniform Suspension and 2009-036 Gary. Debarment Requirement (Interim). VI Limitation on Pass-Through 2008-031 Chambers. Charges. VII Technical Amendments....104-1, 5.601, 7.105, and 10.002. Dated: November 24, 2010. Millisa Gary, Acting Director, Acquisition...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-13
... Business 2009-019 Morgan. Self-Certification (Interim). V Uniform Suspension and 2009-036 Gary. Debarment Requirement (Interim). VI Limitation on Pass-Through 2008-031 Chambers. Charges. VII Technical Amendments... 10.002. Dated: November 24, 2010. Millisa Gary, Acting Director, Acquisition Policy Division. [FR Doc...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...
NASA Technical Reports Server (NTRS)
2009-01-01
This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.
Development of Titanium Alloy Casting Technology
1976-08-01
reduction in melting temperatures (Table 8). (3 0 )Smeltzer, C.E., and Compton, W.A., "Titanium Braze System for High Temperature Applications", First...Compton, W. A., "Titanium Braze System for High Temperature Applications," First Interim Technical Report, Solar Division of International Harvester Co...Microstructures of the Phase 1I Ti-13Cu Alloy (Meat 2LO56) Showing the Effect of Various Aging Treatments After High Temperature Annealing 113 xi
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-14
... Nominations; SAB Environmental Justice Technical Panel AGENCY: Environmental Protection Agency (EPA). ACTION... experts to serve on the SAB Environmental Justice Technical (EJT) Panel. DATES: Nominations should be...) released the Interim Guidance on Considering Environmental Justice During the Development of an Action...
2015-06-23
DISTRIBUTION/AVAILABILITY STATEMENT DISTRIBUTION A 13. SUPPLEMENTARY NOTES 14. ABSTRACT Fighter jets and other aircraft with high specific thrust engines...interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc. 3. DATES COVERED. Indicate the time during which the...State the type of report, such as final, technical, interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc
ERIC Educational Resources Information Center
Cook, Desmond L.; And Others
This memorandum reports on the third phase, the design, of a four-phase project to design project management training materials for local educational agencies. The first section of the memorandum explains some considerations regarding management education and the organization of the report. Section 2 presents the design specifications for the…
Quantum Manybody Physics with Rydberg Polaritons
2016-06-22
report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...for public release. Over the course of this grant, we have seen tremendous progress, both theoretically and experimentally , in our control of photonic...shown in multiple stages of construction at left and below, spans three optical tables in two rooms: One for the experimental control system
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
An Interim Report on NASA's Draft Space Technology Roadmaps
NASA Technical Reports Server (NTRS)
2011-01-01
NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13 Ground and Launch Systems Processing B Panel 2: Robotics, Communications, and Navigation TA04 Robotics, TeleRobotics, and Autonomous Systems TA05 Communication and Navigation Systems C Panel 3: Instruments and Computing TA08 Science Instruments, Observatories, and Sensor Systems TA11 Modeling, Simulation, Information Technology, and Data Processing D Panel 4: Human Health and Surface Exploration TA06 Human Health, Life Support, and Habitation Systems TA07 Human Exploration Destination Systems E Panel 5: Materials Panel TA10 Nanotechnology TA12 Materials, Structures, Mechanical Systems, and Manufacturing TA14 Thermal Management Systems F Panel 6: Entry, Descent, and Landing Panel TA09 Entry, Descent, and Landing Systems In addition to drawing on the expertise represented on the steering committee and panels, the committee obtained input from each of 14 public workshops held on each of the 14 roadmaps. At these 1-day workshops, invited speakers, guests, and members of the public engaged in discussions on the different technology areas and their value to NASA. Broad community input was also solicited from a public website, where more than 240 public comments were received on the draft roadmaps in response to application of criteria (such as benefit, risk and reasonableness, and alignment with NASA and national goals) that the steering committee established. This interim report reflects the results of deliberations by the steering committee in light of these public inputs as well as additional inputs from the six panels. The steering committee's final report will be completed early in 2012. That report will prioritize the technologies that span the entire scope of the 14 roadmaps and provide additional guidance on crosscutting themes and other relevant topics.
Electrical and Thermal Transport Property Studies of High-Temperature Thermoelectric Materials.
1985-06-01
THERMAL TRANSPORT PROPERTY STUDIES OF HIGH-TEMPERATURE THERMOELECTRIC MATERIALS: INTERIM TECHNICAL REPORT FOR THE PERIOD MAY 15, 1984 TO MAY 15, 1985 J. L...transport property data base has been expanded oy continued measurements in several systems under study, and a theoretical model for thermoelectric ...6.0 REFERENCES . . . . . . . . . . . . 6.1 APPENDIX A - THERMOELECTRIC PROPERTY DATA . . . . . . . A. I 1l FIGURES 3.1 Dimensionless Figure of Merit
THE EDUCATION AND EMPLOYMENT OF TECHNICIANS. INTERIM REPORT.
ERIC Educational Resources Information Center
BJORKQUIST, DAVID C., ED.
THE TECHNICAL MANPOWER CONFERENCE, HELD AT THE PENNSYLVANIA STATE UNIVERSITY CAMPUS ON JANUARY 24 AND 25, 1968, WAS THE FIRST PHASE IN THE DISSEMINATION OF THE RESEARCH PROJECT, "EFFECTS OF FIELD AND JOB ORIENTED TECHNICAL RETRAINING ON MANPOWER UTILIZATION OF THE UNEMPLOYED." THE PRESENTATIONS IN PART I, INTENDED TO PROVIDE BACKGROUND…
User Selection of Purchased Information Services. Interim Technical Report (June 1975-January 1976).
ERIC Educational Resources Information Center
Hall, Homer J.
Interviews conducted in the first phase of a project to develop a method for user selection of purchased scientific and technical information services identified a number of relationship among different populations of users. Research scientists, engineers, and patent attorneys want convenient access to original data identified in the search.…
Evaluation of Searching and Rescue (SAR) Method For Determining Local Wind Current
1991-07-01
JUL 10 1992 ("= Research ajJ Development Centerto 1082 Shennecossett Road . - Groton, CT 06340-6096 INTERIM REPORT July 1991 This document is...United States Coast Guard Research and Development Center 1082 Shennecossett Road Groton, CT 06340-6096 V ’C . l •• mU. Technical Report Documentation...Grant No. 1082 Shennecossett Road Groton, Connecticut 06340-6096 13. Type of Report and Period Covered 12. Sponsoring Agency Name and Address INTERIM
Establishing a Quality Control System for Stem Cell-Based Medicinal Products in China
2015-01-01
Stem cell-based medicinal products (SCMPs) are emerging as novel therapeutic products. The success of its development depends on the existence of an effective quality control system, which is constituted by quality control technologies, standards, reference materials, guidelines, and the associated management system in accordance with regulatory requirements along product lifespan. However, a worldwide, effective quality control system specific for SCMPs is still far from established partially due to the limited understanding of stem cell sciences and lack of quality control technologies for accurately assessing the safety and biological effectiveness of SCMPs before clinical use. Even though, based on the existing regulations and current stem cell sciences and technologies, initial actions toward the goal of establishing such a system have been taken as exemplified by recent development of new “interim guidelines” for governing quality control along development of SCMPs and new development of the associated quality control technologies in China. In this review, we first briefly introduced the major institutions involved in the regulation of cell substrates and therapeutic cell products in China and the existing regulatory documents and technical guidelines used as critical references for developing the new interim guidelines. With focus only on nonhematopoietic stem cells, we then discussed the principal quality attributes of SCMPs as well as our thinking of proper testing approaches to be established with relevant evaluation technologies to ensure all quality requirements of SCMPs along different manufacturing processes and development stages. At the end, some regulatory and technical challenges were also discussed with the conclusion that combined efforts should be taken to promote stem cell regulatory sciences to establish the effective quality control system for SCMPs. PMID:25471126
Editing Tips for Technical Publications in the Joint Nuclear Weapons Publication System (JNWPS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
ALLEN, TARA S.
2002-12-01
These editing tips contain helpful suggestions to assist writers who are writing, editing, and publishing technical publications in the JNWPS. The suggestions clarify some of the most common writing problems and requirements of two publications used in the JNWPS: ''DOE-DTRA TP 1-1, Joint Nuclear Weapons Publications System Operating Procedures, Specifications, and Standards, and United States Government Printing Office Style Manual''. Topics include requirements for abbreviations, formats for drafts, layouts of illustrations and tables, appropriate wording for interim changes, guidance for creating a list of effective pages, how to insert and delete pages and paragraphs, referencing other technical publications, use ofmore » revision bars, requirements for safety precautions, use of hyphens, and how to place warnings, cautions, and notes. Also included are a writer's checklist, samples of draft title pages, and a section of helpful tips for the writers who use the department's desktop publishing software program, Adobe{reg_sign} FrameMaker{reg_sign}.« less
NASA Technical Reports Server (NTRS)
Pepin, Gerard R.
1992-01-01
The simulation development associated with the network models of both the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures is documented. The ISIS Network Model design represents satellite systems like the Advanced Communications Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) Program, moves all control and switching functions on-board the next generation ISDN communications satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete event simulation experiments will be performed with these models using various traffic scenarios, design parameters, and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.
Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vigil-Holterman, Luciana R.
2012-05-07
This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less
ERIC Educational Resources Information Center
Lansman, Marcy, Ed.; Hunt, Earl, Ed.
This technical report contains papers prepared by the 11 speakers at the 1980 Lake Wilderness (Seattle, Washington) Conference on Attention. The papers are divided into general models, physiological evidence, and visual attention categories. Topics of the papers include the following: (1) willed versus automatic control of behavior; (2) multiple…
EPA and the NHTSA collaborated with CARB on this joint Technical Assessment Report to build on the success of the first phase of the National Program to regulate fuel economy and greenhouse gas (GHG) emissions from U.S. light-duty vehicles.
ERIC Educational Resources Information Center
Skinner, Mary J.; Alley, William E.
Research was conducted to determine the effect of changing occupational specialties on the performance of Air Force retrained enlistees attending basic technical schools. The academic performance and attrition rates of approximately 20,000 retrainees and 230,000 nonprior-service enlistees (nonretrainees) attending 272 schools were compared.…
Tribology of Langmuir-Blodgett Films
1992-03-01
poly - meric systems and the use of Langmuir - Blodgett films as lubricants. An, 1473 ESWnoW’oP’-oVsS osOLe UNCLASSIFIED SECUlRTV CLASSIFICATIONi O r ThIS...N/A N/A 4. TITLE (and Subtitle) S. TyPE OF REPORT & PERIOD COVERED Tribology of Langmuir - Blodgett Films Interim Technical Report 6. PERFORMING ORO...Co . - e o If neceesea mnd Identily by block number) Tribology, Langmuir - Blodgett Films 2 AerNACT t 44 Pem.e s* I peminp and tdolvart by block niber
Applied Reading Test--Forms A and B, Interim Manual, and Answer Sheets.
ERIC Educational Resources Information Center
Australian Council for Educational Research, Hawthorn.
Designed for use in the selection of apprentices, trainees, technical and trade personnel, and any other persons who need to read and understand text of a technical nature, this Applied Reading Test specimen set contains six passages and 32 items, has a 30-minute time limit, and is presented in a reusable multiple choice test booklet. The specimen…
Orbit Transfer Systems with Emphasis on Shuttle Applications, 1986-1991
NASA Technical Reports Server (NTRS)
1977-01-01
A systems study is presented for a transportation system which will follow the interim upper stage and spinning solid upper stage. Included are concepts, concept comparisons, trends, parametric data, etc. associated with the future system. Relevant technical and programmatic information is developed. This information is intended to focus future activity to identify attractive options and to summarize the major issues associated with the future development of the system. To establish a common basis for identifying current transportation concepts, an orbit transfer vehicle (OTV) is defined as a propulsive (velocity producing) rocket or stage. When used with a crew transfer module, a manned sortie module or other payloads, the combination becomes an orbit transfer system (OTS). Standardization of OTV's and OTS's is required.
Interim Exceptional Events Rule Frequently Asked Questions
Air agencies and other stakeholders have raised technical questions and issues related to implementation since the EPA promulgated the EER. This Question and Answer (Q&A) document is intended to respond to some of these frequently asked questions.
Curtis H. Flather; Michael S. Knowles; Jason McNees
2008-01-01
This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974. It updates past reports on the trends and geographic patterns of species formally listed as threatened or endangered under the Endangered Species Act of 1973. We...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolff, Dietmar; Voelzke, Holger; Weber, Wolfgang
2007-07-01
The German-Russian project that is part of the G8 initiative on Global Partnership Against the Spread of Weapons and Materials of Mass Destruction focuses on the speedy construction of a land-based interim storage facility for nuclear submarine reactor compartments at Sayda Bay near Murmansk. This project includes the required infrastructure facilities for long-term storage of about 150 reactor compartments for a period of about 70 years. The interim storage facility is a precondition for effective activities of decommissioning and dismantlement of almost all nuclear-powered submarines of the Russian Northern Fleet. The project also includes the establishment of a computer-assisted wastemore » monitoring system. In addition, the project involves clearing Sayda Bay of other shipwrecks of the Russian navy. On the German side the project is carried out by the Energiewerke Nord GmbH (EWN) on behalf of the Federal Ministry of Economics and Labour (BMWi). On the Russian side the Kurchatov Institute holds the project management of the long-term interim storage facility in Sayda Bay, whilst the Nerpa Shipyard, which is about 25 km away from the storage facility, is dismantling the submarines and preparing the reactor compartments for long-term interim storage. The technical monitoring of the German part of this project, being implemented by BMWi, is the responsibility of the Federal Institute for Materials Research and Testing (BAM). This paper gives an overview of the German-Russian project and a brief description of solutions for nuclear submarine disposal in other countries. At Nerpa shipyard, being refurbished with logistic and technical support from Germany, the reactor compartments are sealed by welding, provided with biological shielding, subjected to surface treatment and conservation measures. Using floating docks, a tugboat tows the reactor compartments from Nerpa shipyard to the interim storage facility at Sayda Bay where they will be left on the on-shore concrete storage space to allow the radioactivity to decay. For transport of reactor compartments at the shipyard, at the dock and at the storage facility, hydraulic keel blocks, developed and supplied by German subcontractors, are used. In July 2006 the first stage of the reactor compartment storage facility was commissioned and the first seven reactor compartments have been delivered from Nerpa shipyard. Following transports of reactor compartments to the storage facility are expected in 2007. (authors)« less
Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Bannochie, C. J.
2017-02-23
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.
Curtis H. Flather; Michael S. Knowles; Stephen J. Brady
2009-01-01
This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974 (RPA). It updates past reports on national and regional trends in population and harvest estimates for species classified as big game and small game. The trends...
Cybersecurity vulnerabilities in medical devices: a complex environment and multifaceted problem
Williams, Patricia AH; Woodward, Andrew J
2015-01-01
The increased connectivity to existing computer networks has exposed medical devices to cybersecurity vulnerabilities from which they were previously shielded. For the prevention of cybersecurity incidents, it is important to recognize the complexity of the operational environment as well as to catalog the technical vulnerabilities. Cybersecurity protection is not just a technical issue; it is a richer and more intricate problem to solve. A review of the factors that contribute to such a potentially insecure environment, together with the identification of the vulnerabilities, is important for understanding why these vulnerabilities persist and what the solution space should look like. This multifaceted problem must be viewed from a systemic perspective if adequate protection is to be put in place and patient safety concerns addressed. This requires technical controls, governance, resilience measures, consolidated reporting, context expertise, regulation, and standards. It is evident that a coordinated, proactive approach to address this complex challenge is essential. In the interim, patient safety is under threat. PMID:26229513
Cybersecurity vulnerabilities in medical devices: a complex environment and multifaceted problem.
Williams, Patricia Ah; Woodward, Andrew J
2015-01-01
The increased connectivity to existing computer networks has exposed medical devices to cybersecurity vulnerabilities from which they were previously shielded. For the prevention of cybersecurity incidents, it is important to recognize the complexity of the operational environment as well as to catalog the technical vulnerabilities. Cybersecurity protection is not just a technical issue; it is a richer and more intricate problem to solve. A review of the factors that contribute to such a potentially insecure environment, together with the identification of the vulnerabilities, is important for understanding why these vulnerabilities persist and what the solution space should look like. This multifaceted problem must be viewed from a systemic perspective if adequate protection is to be put in place and patient safety concerns addressed. This requires technical controls, governance, resilience measures, consolidated reporting, context expertise, regulation, and standards. It is evident that a coordinated, proactive approach to address this complex challenge is essential. In the interim, patient safety is under threat.
INTERIM METHOD FOR THE DETERMINATION OF ASBESTOS IN BULK INSULATION SAMPLES
The U.S. Environmental Protection Agency Asbestos-in-Schools Program was established in March, 1979 to provide information and technical assistance to the public for addressing problems presented by asbestos-containing insulation materials in school buildings. Because there were ...
75 FR 35672 - Changes in Flood Elevation Determinations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-23
...This interim rule lists communities where modification of the Base (1% annual-chance) Flood Elevations (BFEs) is appropriate because of new scientific or technical data. New flood insurance premium rates will be calculated from the modified BFEs for new buildings and their contents.
75 FR 25110 - Inmate Communication With News Media: Removal of Byline Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-07
... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 540 [BOP-1149] RIN 1120-AB49 Inmate Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice Department. ACTION: Interim final rule; technical correction. [[Page 25111
40 CFR 265.1059 - Standards: Delay of repair.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Section 265.1059 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... technically infeasible without a hazardous waste management unit shutdown. In such a case, repair of this...
Stavropoulos, S William; Sing, Ronald F; Elmasri, Fakhir; Silver, Mitchell J; Powell, Alex; Lynch, Frank C; Aal, Ahmed Kamel Abdel; Lansky, Alexandra J; Settlage, Richard A; Muhs, Bart E
2014-10-01
To assess safety and effectiveness of a nitinol retrievable inferior vena cava (IVC) filter in patients who require caval interruption to protect against pulmonary embolism (PE). Two hundred patients with temporary indications for an IVC filter were enrolled in this prospective, multicenter clinical study. Patients undergoing filter implantation were to be followed for 2 years or for 30 days after filter retrieval. At the time of the present interim report, all 200 patients had been enrolled in the study, and 160 had undergone a retrieval attempt or been followed to 6 months with their filter in place. Primary study endpoints included technical and clinical success of filter placement and retrieval. Patients were also evaluated for recurrent PE, new or worsening deep vein thrombosis, and filter migration, fracture, penetration, and tilt. Clinical success of placement was achieved in 94.5% of patients (172 of 182), with a one-sided lower limit of the 95% confidence interval of 90.1%. Technical success rate of filter placement was 99.5%. Technical success rate of retrieval was 97.3%; 108 filters were retrieved in 111 attempts. In two cases, the filter apex could not be engaged with a snare, and one device was engaged but could not be removed. Filter retrievals occurred at a mean indwell time of 165 days (range, 5-632 d). There were no instances of filter fracture, migration, or tilt greater than 15° at the time of retrieval or 6-month follow-up. In this interim report, the nitinol retrievable IVC filter provided protection against pulmonary embolism, and the device could be retrieved with a low rate of complications. Copyright © 2014 SIR. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Automated Residential Energy Standard (ARES) program is designed to identify levels of thermal integrity (e.g., insulation levels, glazing layers, equipment efficiencies, etc.) that are cost effective for typical residential structures and to create a residential energy standard based on these levels. This document contains technical background the explains the data and the algorithms used by the program.
75 FR 6839 - Technical Service Provider Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-12
... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...
This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.
DOT National Transportation Integrated Search
1999-04-30
This report documents a sample of heavy-duty truck activity. This research effort was originated by the Planning and Technical Support Division of the California Air Resources Board (CARB) and jointly supported by the Federal Highway Administration (...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Bannochie, C. J.
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).
DOT National Transportation Integrated Search
2002-08-01
The purpose of this research is to evaluate the effectiveness of soil cement shrinkage crack mitigation techniques. Ten test sections, 1000 feet long, were constructed on LA 89 in Vermilion Parish. The shrinkage crack mitigation methods being evaluat...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Binh T. Pham; Nancy J. Lybeck; Vivek Agarwal
The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned bymore » Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spachner, S.A.
1962-10-31
A container-sleeve-liner assembly was designed which will provide adequate support for ceramic, ceramic coated metal, or metal liners. The design minimizes mechanical property requirements of liner materials, and permits rapid removal of worn or damaged liners. A high-strength stem was designed and fabricated. Technical literature on high-strength materials was reviewed, and high-strength materials producers were contacted to locate sources and assess applicability of existing materials for refractory metal extrusion liner use. (auth)
78 FR 13478 - Compassionate Release; Technical Changes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... (Bureau) makes a minor change to remove an administrative level of review from the processing of a... interim rule, the Bureau of Prisons (Bureau) makes a minor change to remove an administrative level of review from the processing of a Compassionate Release request packet. DATES: This rule is effective April...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
...-indicator of the Capital Fund indicator to all PHAs for the Capital Fund Indicator under the PHAS interim... transition to the scoring system implemented by the PHAS interim rule, especially as relates to the indicator that assesses occupancy rate. The 5 points for the occupancy sub-indicator will be awarded for fiscal...
Integrated waste management system costs in a MPC system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Supko, E.M.
1995-12-01
The impact on system costs of including a centralized interim storage facility as part of an integrated waste management system based on multi-purpose canister (MPC) technology was assessed in analyses by Energy Resources International, Inc. A system cost savings of $1 to $2 billion occurs if the Department of Energy begins spent fuel acceptance in 1998 at a centralized interim storage facility. That is, the savings associated with decreased utility spent fuel management costs will be greater than the cost of constructing and operating a centralized interim storage facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shapiro, S.C.; Woolf, B.
The Northeast Artificial Intelligence Consortium (NAIC) was created by the Air Force Systems Command, Rome Air Development Center, and the Office of Scientific Research. Its purpose is to conduct pertinent research in artificial intelligence and to perform activities ancillary to this research. This report describes progress that has been made in the fourth year of the existence of the NAIC on the technical research tasks undertaken at the member universities. The topics covered in general are: versatile expert system for equipment maintenance, distributed AI for communications system control, automatic photointerpretation, time-oriented problem solving, speech understanding systems, knowledge base maintenance, hardwaremore » architectures for very large systems, knowledge-based reasoning and planning, and a knowledge acquisition, assistance, and explanation system. The specific topic for this volume is the recognition of plans expressed in natural language, followed by their discussion and use.« less
ERIC Educational Resources Information Center
What Works Clearinghouse, 2015
2015-01-01
The study, "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading," examined the effects of using Diagnostic Assessment Tools (DAT) on mathematics and reading outcomes for students in 59 Indiana schools during the 2009-10 academic year. DAT consists of interim assessment tools--Wireless Generation's mCLASS for…
ERIC Educational Resources Information Center
Cudmore, Wynn, Ed.; Kelly, Susie, Ed.
The Northwest Center for Sustainable Resources (NCSR) is a partnership of educators and numerous agencies dealing with natural resource management. NCSR emphasizes the ecosystem as a central theme in natural resource technical education. This booklet explains NCSR's relationship to secondary and higher education, describes NCSR programs and…
FOD Prevention at NASA-Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Lowrey, Nikki M.
2011-01-01
NASA now requires all flight hardware projects to develop and implement a Foreign Object Damage (FOD) Prevention Program. With the increasing use of composite and bonded structures, NASA now also requires an Impact Damage Protection Plan for these items. In 2009, Marshall Space Flight Center released an interim directive that required all Center organizations to comply with FOD protocols established by on-site Projects, to include prevention of impact damage. The MSFC Technical Standards Control Board authorized the development of a new MSFC technical standard for FOD Prevention.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chabert, C.; Coquelet-Pascal, C.; Saturnin, A.
Studies have been performed to assess the industrial perspectives of partitioning and transmutation of long-lived elements. These studies were carried out in tight connection with GEN-IV systems development. The results include the technical and economic evaluation of fuel cycle scenarios along with different options for optimizing the processes between the minor actinide transmutation in fast neutron reactors, their interim storage and geological disposal of ultimate waste. The results are analysed through several criteria (impacts on waste, on waste repository, on fuel cycle plants, on radiological exposure of workers, on costs and on industrial risks). These scenario evaluations take place inmore » the French context which considers the deployment of the first Sodium-cooled Fast Reactor (SFR) in 2040. 3 management options of minor actinides have been studied: no transmutation, transmutation in SFR and transmutation in an accelerator-driven system (ADS). Concerning economics the study shows that the cost overrun related to the transmutation process could vary between 5 to 9% in SFR and 26 % in the case of ADS.« less
Tribal child welfare. Interim final rule.
2012-01-06
The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.
77 FR 11385 - Security Considerations for Lavatory Oxygen Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... Considerations for Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim... considerations for lavatory oxygen systems (77 FR 12550). The interim final rule addresses a security... oxygen systems installed inside the lavatories of most transport category airplanes. As a result, the FAA...
76 FR 12550 - Lavatory Oxygen Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim final rule... related to the provisioning of supplemental oxygen inside lavatories. This action is necessitated by other mandatory actions that temporarily render such oxygen systems inoperative. DATES: This interim rule is...
NASA Astrophysics Data System (ADS)
Huang, J. C.; Wright, W. V.
1982-04-01
The Defense Waste Processing Facility (DWPF) for immobilizing nuclear high level waste (HLW) is scheduled to be built. High level waste is produced when reactor components are subjected to chemical separation operations. Two candidates for immobilizing this HLW are borosilicate glass and crystalline ceramic, either being contained in weld sealed stainless steel canisters. A number of technical analyses are being conducted to support a selection between these two waste forms. The risks associated with the manufacture and interim storage of these two forms in the DWPF are compared. Process information used in the risk analysis was taken primarily from a DWPF processibility analysis. The DWPF environmental analysis provided much of the necessary environmental information.
Interim report : a non-overlay cathodic protection system.
DOT National Transportation Integrated Search
1983-01-01
This interim report describes Virginia's experience in installing its first cathodic protection system for a bridge deck. The installation was completed with practically no problems. Very minor problems have been encountered with the rectifier/contro...
NASA Astrophysics Data System (ADS)
Berry, W.; Grallert, H.
1996-02-01
The paper presents a synthesis of the performance and technical feasibility assessment of 7 reusable launcher types, comprising 13 different vehicles, studied by European Industry for ESA in the ESA Winged Launcher Study in the period January 1988 to May 1994. The vehicles comprised single-stage-to-orbit (SSTO) and two-stage-to-orbit (TSTO) vehicles, propelled by either air-breathing/rocket propulsion or entirely by rocket propulsion. The results showed that an SSTO vehicle of the HOTOL-type, propelled by subsonic combustion air-breathing/rocket engines could barely deliver the specified payload mass and was aerodynamically unstable; that a TSTO vehicle of the Saenger type, employing subsonic combustion airbreathing propulsion in its first stage and rocket propulsion in its second stage, could readily deliver the specified payload mass and was found to be technically feasible and versatile; that an SSTO vehicle of the NASP type, propelled by supersonic combustion airbreathing/rocket propulsion was able to deliver a reduced payload mass, was very complex and required very advanced technologies; that an air-launched rocket propelled vehicle of the Interim HOTOL type, although technically feasible, could deliver only a reduced payload mass, being constrained by the lifting capability of the carrier airplane; that three different, entirely rocket-propelled vehicles could deliver the specified payload mass, were technically feasible but required relatively advanced technologies.
Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
TORRES, T.D.
RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less
75 FR 66553 - Truth in Lending
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...
ERIC Educational Resources Information Center
LESCARBEAU, ROLAND F.; AND OTHERS
A SUGGESTED POST-SECONDARY CURRICULUM GUIDE FOR ELECTRO-MECHANICAL TECHNOLOGY ORIENTED SPECIFICALLY TO THE COMPUTER AND BUSINESS MACHINE FIELDS WAS DEVELOPED BY A GROUP OF COOPERATING INSTITUTIONS, NOW INCORPORATED AS TECHNICAL EDUCATION CONSORTIUM, INCORPORATED. SPECIFIC NEEDS OF THE COMPUTER AND BUSINESS MACHINE INDUSTRY WERE DETERMINED FROM…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... sections of the interim final guidance at 2 CFR part 176 that pertain to international agreements. These amendments reflect changes with respect to U.S. international obligations since the publication of the... international agreements. First, it makes a technical correction to section 176.90(a). Second, it changes the...
Polyphosphazene Solid Electrolytes.
1984-10-01
soL..I’IIN ’ . LAV A - .:.u.s 009 ’-" 4. T .. T. edSutoe .TVCO EO T EI O Polyphosphazene Solid Electrolytes Interim Technical Repor 6. PEAFORMING RG ...Y. T.; Whitmore , D. H. Solid State Ionics 1982, 7, 129. (10) Bauerle, J. E. J. Phys. Chem. Solids 1969, 30, 2657. (11) MacDonald, J. R. J. Chem. Phys
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-29
..., during regular business hours, by arranging with the contact person identified below. FOR FURTHER... interim final rule, we invite your comments on how to make rules easier to understand. For example: [[Page... diagrams? What else could we do to make the rule easier to understand? Does the rule contain technical...
ERIC Educational Resources Information Center
German, Carl, Jr.
The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…
Human-Machine Teams: The Social Frontier
2015-12-01
Trust & Interaction Branch December 2015 Interim Report Distribution A. Approved for public release AIR FORCE RESEARCH LABORATORY 711TH HUMAN...711th Human Performance Wing Air Force Research Laboratory This report is published in the interest of scientific and technical information exchange... Research Laboratory 711th Human Performance Wing Human Effectiveness Directorate Human Centered ISR Division Human Trust & Interaction Branch Wright
ERIC Educational Resources Information Center
Yelinek, Kathryn; Hinchcliff, Marilou
2009-01-01
The results of a survey to determine the training needs and normative experiences of temporary government documents librarians are presented. The results indicate that temporary librarians tend to work in academia, have been in librarianship for a shorter time period, and have fewer technical processing skills than permanent documents librarians.…
Taxonomy of Learning Skills. Interim Technical Report for the Period February 1986-1987.
ERIC Educational Resources Information Center
Kyllonen, Patrick C.; Shute, Valerie J.
Questions concerning individual differences in learning ability may be more precisely addressed in light of an agreed-upon taxonomy of learning skills. Existing taxonomies are reviewed, and their shortcomings are described. A taxonomy is then proposed based on a synthesis of current thought consisting of four dimensions: the forms of knowledge;…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.
Computerization of material test data reporting system : interim report.
DOT National Transportation Integrated Search
1973-09-01
This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
.... Background There is growing interest in installing solar photovoltaic (PV) and solar hot water (SHW) systems on airports. While solar PV or SHW systems (henceforth referred to as solar energy systems) are... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Interim Policy, FAA Review of Solar...
System architecture for the Canadian interim mobile satellite system
NASA Technical Reports Server (NTRS)
Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.
1988-01-01
The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.
Interim Assessment of the VAL Automated Guideway Transit System.
DOT National Transportation Integrated Search
1981-11-01
This report describes an interim assessment of the VAL (Vehicules Automatiques Legers or Light Automated Vehicle) AGT system which is currently under construction in Lille, France, and which is to become fully operational in December 1983. This repor...
33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?
Code of Federal Regulations, 2010 CFR
2010-07-01
... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...
THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.
2010-08-31
This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be sharedmore » between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.« less
2004-06-17
The rule makes technical changes to the Healthcare Integrity and Protection Data Bank (HIPDB) data collection reporting requirements set forth in 45 CFR part 61 by clarifying the types of personal numeric identifiers that may be reported to the data bank in connection with adverse actions. Specifically, the rule clarifies that in lieu of a Social Security Number (SSN), an individual taxpayer identification number (ITIN) may be reported to the data bank when, in those limited situations, an individual does not have an SSN.
Emery, Robert J
2012-11-01
Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.
Multifunctional Nanotechnology Research
2016-03-01
MULTIFUNCTIONAL NANOTECHNOLOGY RESEARCH MARCH 2016 INTERIM TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED STINFO COPY AIR...REPORT 3. DATES COVERED (From - To) JAN 2015 – JAN 2016 4. TITLE AND SUBTITLE MULTIFUNCTIONAL NANOTECHNOLOGY RESEARCH 5a. CONTRACT NUMBER IN-HOUSE...H. Yoon, and C. S. Hwang, “Electrically configurable electroforming and bipolar resistive switching in Pt/TiO2/Pt structures.,” Nanotechnology , vol
Technical Operations (TOPS) IV Task Order 0003: Responsive Interface for Transport Tuning (RITT)
2016-05-29
on the further development of artificial hair sensors (AHS) featuring a responsive carbon nanotube (CNT) array to serve as a piezoresistive element...under separate cover, as AFRL Interim Report AFRL-RX-WP-TR-2016-0071 dated 30 October 2015. 15. SUBJECT TERMS artificial hair sensor, carbon... Hair Sensors: Fabrication and Model Parameterization .......................... 4 3.1.1 Introduction
Examination of Multi-Core Architectures
2010-11-01
NOVEMBER 2010 2. REPORT TYPE Interim Technical Report 3. DATES COVERED (From - To) February 2010 – July 2010 4 . TITLE AND SUBTITLE EXAMINATION OF...STATEMENT 1 2.0 BACKGROUND 1 3.0 ARCHITECTURE CHARACTERISTICS 3 3.1 NVIDIA Tesla 3 3.2 TILE64 4 ...1 Tesla Architecture 3 2 TILE64 Architecture 4 3 Single Tile Architecture 4 4 STI Cell Broadband Engine
Cyberspace, the 7th Joint Function for 21st Century Warfare
2017-03-31
such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research, special, group study, etc . 3. DATE COVERED...procedures, e.g. RD/FRD, PROPIN, ITAR, etc . Include copyright information. 13. SUPPLEMENTARY NOTES. Enter information not included...elsewhere such as: prepared in cooperation with; translation of; report supersedes; old edition number, etc . 14. ABSTRACT. A brief (approximately
ERIC Educational Resources Information Center
Ree, Malcolm James; And Others
A study investigated the roles of general ability and specific abilities as predictors of several job performance criteria for Air Force enlistees in eight jobs. Subjects were 1,545 Air Force enlistees entering from 1984 through 1988 who had tested with the Armed Services Vocational Aptitude Battery (ASVAB) parallel forms 11, 12, or 13. Subjects…
SUSTAINABLE ALLOY DESIGN: SEARCHING FOR RARE EARTH ELEMENT ALTERNATIVES THROUGH CRYSTAL ENGINEERING
2016-02-26
Property Maps to Guide Materials Design via Statistical Learning Summer Research Group Meeting – Materials by Design Los Alamos National Laboratory, July...Informatics, Rational design , Quantitative correlative spectroscopy and imaging, DFT, In situ high pressure mechanical property measurements, Superalloy...final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED. Indicate the
ERIC Educational Resources Information Center
Lescarbeau, Roland F.; And Others
This suggested curriculum guide represents the consensus of opinion by the representatives of seven schools comprising the Technical Education Consortium, with advice of industrial experts concerning the essential educational needs of the technicians they would employ. It will serve as a guide to schools planning to institute a program applicable…
2005-03-25
This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.
77 FR 25910 - National Trails System Act and Railroad Rights-of-Way
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION...) for rail banking and interim trail use under the National Trails System Act (Trails Act). New rules are adopted that require the parties jointly to notify the Board when an interim trail use/rail...
Cost Implications of an Interim Storage Facility in the Waste Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jarrell, Joshua J.; Joseph, III, Robert Anthony; Howard, Rob L
2016-09-01
This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruno, M.J.
1980-10-01
Beneficiation of bauxite by high intensity wet magnetic separation to remove Fe and Ti was not successful. Pilot reactor VSR-3 was modified and operated to evaluate the blast-arc reduction process concept. Modifications included a tapered upper shaft section, vertical stroke ram, and CO preheater system. The taper/ram revisions were successful in maintaining bed movement, resulting in several continuous runs in which large quantities of burden were fed and metal product was recovered. Pilot VSR samples were also analyzed. The major phases contained Si and FeSi/sub 2/Al/sub 4/ intermetallics in a matrix of eutectic Al-Si.
Building an Interim Assessment System: A Workbook for School Districts
ERIC Educational Resources Information Center
Crane, Eric W.
2010-01-01
As someone with a stake in a school district's systems, a person probably does not have all the answers around what is necessary to build an effective interim assessment system. Neither does this workbook. But it is intended to have the right questions. More precisely, this workbook contains the vision, infrastructure, and resource questions…
ERIC Educational Resources Information Center
Lamb, Theodore A.; Chin, Keric B. O.
This paper proposes a conceptual framework based on different levels of analysis using the metaphor of the layers of an onion to help organize and structure thinking on research issues concerning training. It discusses the core of the "analytic onion," the biological level, and seven levels of analysis that surround that core: the individual, the…
The variable polarity plasma arc welding process: Its application to the Space Shuttle external tank
NASA Technical Reports Server (NTRS)
Nunes, A. C., Jr.; Bayless, O. E., Jr.; Jones, C. S., III; Munafo, A. P.; Wilson, W. A.
1983-01-01
The technical history of the variable polarity plasma arc (VPPA) welding process being introduced as a partial replacement for the gas shielded tungsten arc process in assembly welding of the space shuttle external tank is described. Interim results of the weld strength qualification studies, and plans for further work on the implementation of the VPPA process are included.
Combinational Optimal Stopping Problems
2016-04-01
such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...Vinel, A. and P. Krokhmal (2015) Certainty equivalent measures of risk, Annals of Operations Research , DOI:10.1007/s10479-015-1801-0. [3] Chernikov...Operations Research , 50(3):415–423, 2002. [16] I. Ljubi, P. Mutzel, and B. Zey. Stochastic survivable network design problems. Electronic Notes in Discrete
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
... System (PHAS) Capital Fund Interim Scoring Notice: Reinstitution of Five Points for Occupancy Sub... of comments allows the commenter maximum time to prepare and submit a comment, ensures timely receipt... www.regulations.gov . FOR FURTHER INFORMATION CONTACT: Claudia J. Yarus, Real Estate Assessment Center...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cumberland, Riley M.; Williams, Kent Alan; Jarrell, Joshua J.
This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.
Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.
ERIC Educational Resources Information Center
Bezdek, Roger
This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-07-01
The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less
NASA Technical Reports Server (NTRS)
Livingston, John M.
1999-01-01
This report documents the research performed under NASA Ames Cooperative Agreement NCC 2-991, which covered the period 1 April 1997 through 31 March 1999. Previously, an interim technical report (Technical Report No. 1, 20 March 1998) summarized the work completed during the period 1 April 1997 through 31 March 1998. The objective of the proposed research was to advance our understanding of atmospheric aerosol behavior, aerosol-induced climatic effects, and the remote measurement and retrieval capabilities of spaceborne sensors such as SAGE II by combining and comparing data from these instruments and from airborne and ground-based instruments.
Earfold Implantable Clip System for Correction of Prominent Ears: Analysis of Safety in 403 Patients
Sojitra, Nilesh; Glumicic, Sinisa; Vlok, Jacobus A.; O’Toole, Greg; Hannan, S. Alam; Sabbagh, Walid
2018-01-01
Background: The Earfold system, a new treatment for the correction of prominent ears, consists of 3 components: the Earfold implant, the Earfold introducer, and the Prefold positioner. Methods: This is an interim report based on an ongoing analysis of safety in a series of patients treated for prominent ears with the Earfold implant between February 2013 and September 2014. Safety was assessed based on adverse event reports and the need for implant revision; follow-up is ongoing. Results: Seven surgeons used 1,200 Earfold implants to treat 403 patients (ages, 7–70 years; 63% male); the time since the initial implant procedure now ranges from 30 to 48 months. To date, 145 patients (36%) have returned for a follow-up visit (mean, 7.7 months [range, 1–34 months]). Adverse events requiring intervention have affected 39 of 403 (9.7%) patients; these include implant revisions (n = 17 [4.2%], most often due to implant visibility), skin erosion over the implant (n = 15 [3.7%]), and infection (n = 7 [1.7%]). Bleeding, recurrence of prominence, hematoma, deformity, or adverse scarring did not occur. Conclusions: This interim analysis has shown that Earfold prominent ear correction system is associated with relatively few adverse events that require intervention; a small number of patients experienced infection, implant extrusion, or implant visibility that required revision. Most adverse events were related to either patient selection or technical errors at implantation. It is expected that with continued use of Earfold by surgeons experienced in otoplasty, the adverse event incidence will decrease. PMID:29464160
NASA Technical Reports Server (NTRS)
Reid, Concha, M.; Reid, Concha M.
2011-01-01
Vehicles and stand-alone power systems that enable the next generation of human missions to the Moon will require energy storage systems that are safer, lighter, and more compact than current state-of-the- art (SOA) aerospace quality lithium-ion (Li-ion) batteries. NASA is developing advanced Li-ion cells to enable or enhance the power systems for the Altair Lunar Lander, Extravehicular Activities spacesuit, and rovers and portable utility pallets for Lunar Surface Systems. Advanced, high-performing materials are required to provide component-level performance that can offer the required gains at the integrated cell level. Although there is still a significant amount of work yet to be done, the present state of development activities has resulted in the synthesis of promising materials that approach the ultimate performance goals. This report on interim progress of the development efforts will elaborate on the challenges of the development activities, proposed strategies to overcome technical issues, and present performance of materials and cell components.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1978-01-31
This appendix is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This appendix provides the legal/regulatory reference material, supportive of Volume 2 - GSFLS Visit Finding and Evaluations; and certain background material on British Nuclear Fuel Limited (BNFL).
Prizes for innovation of new medicines and vaccines.
Love, James; Hubbard, Tim
2009-01-01
This article argues that prizes can help stimulate medical innovation, control costs and ensure greater access to new medicines and vaccines. The authors explore four increasingly ambitious prize options to reward medical innovation, each addressing flaws in the current patent system. The first option promotes innovation through a large prize fund linked to the impact on health outcomes; the second option rewards the sharing of knowledge, data, and technology with open source dividends; the third option awards prizes for interim benchmarks and discrete technical problems; and the final option removes the exclusive right to use patented inventions in upstream research in favor of prizes. The authors conclude that a system of prizes to reward drug development would break the link between R&D incentives and product prices, and that such a reform is needed to improve innovation and access to new medicines and vaccines.
ERIC Educational Resources Information Center
Technical Education Research Center, Cambridge, MA.
Phase I of a multiphase research program in progress at the Technical Education Research Center, Inc., was conducted to analyze needs and resources in terms of job performance tasks, career opportunities, and training requirements for nuclear medical technicians. Data were gathered through personal interviews with 203 persons, mostly physicians,…
Field Demonstration of Light Obscuration Particle Counting Technologies to Detect Fuel Contaminates
2016-12-01
to detect fuel contamiation including particulates and free water 15. SUBJECT TERMS fuel, JP-8, aviation fuel, contamination, free water ...undissolved water , F24 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT none 18. NUMBER OF PAGES 12 19a. NAME OF RESPONSIBLE PERSON Joel...technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED. Indicate the time during
The New Guard: A Service-Equivalent Force
2012-06-07
quartermas ter , medical , ordinance and inspector general. The bureaus were designed to be more efficient and deliver cost aving; but. onl y created...2. REPORT TYPE. State the type of report, such as final , technical, interim, memorandum, master’s thesis , progress, quarterly, research ...the report, performing the research , or credited with the content of the report. The form of entry is the last name, first name, middle initial, and
Refractometry and Extinguishment/Burnback Testing of Pacific Air Forces AFFF
2006-04-01
AFRL-ML-TY-TR-2006-4536 REFRACTOMETRY AND EXTINGUISHMENT/ BURNBACK TESTING OF PACIFIC AIR FORCES AFFF Jennifer L. Kalberer...NAME OF RESPONSIBLE PERSON 19b. TELEPHONE NUMBER (Include area code) 31-04-2006 Interim Technical Report 01-08-2005 -- 30-09-2005 Refractometry and...AFRL) performed refractometry and extinguishment/burnback tests on samples of Ansulite and 3M aqueous film forming foam (AFFF) from an overseas air
Cellular Mechanisms of Transcranial Direct Current Stimulation
2016-07-14
REPORT TYPE. State the type of report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group ...in fEPSP timing was not resolved. Importantly, grouping across all pathways (e.g. not controlling pathway selectivity), 8 V/m radial positive fields...each signal group during DCS and in control conditions (no electrical stimulation). F) Changes in synaptic strength for each signal group under all
NASA Technical Reports Server (NTRS)
2002-01-01
The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.
76 FR 78977 - Real Estate Settlement Procedures Act (Regulation X)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
...Title X of the Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) transferred rulemaking authority for a number of consumer financial protection laws from seven Federal agencies to the Bureau of Consumer Financial Protection (Bureau) as of July 21, 2011. The Bureau is in the process of republishing the regulations implementing those laws with technical and conforming changes to reflect the transfer of authority and certain other changes made by the Dodd-Frank Act. In light of the transfer of the Department of Housing and Urban Development's (HUD's) rulemaking authority for the Real Estate Settlement Procedures Act (RESPA) to the Bureau, the Bureau is publishing for public comment an interim final rule establishing a new Regulation X (Real Estate Settlement Procedures Act). This interim final rule does not impose any new substantive obligations on persons subject to the existing Regulation X, previously published by HUD.
2013-09-01
such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...appear in the report, e.g. 001; AFAPL30480105. 6. AUTHOR(S). Enter name(s) of person(s) responsible for writing the report, performing the research ...negatively impacted by the noise] SAFTY ALL NEW military aircraft designs suffer crashes during their initial development peri~ Bringing the F-35
FAA (Federal Aviation Administration) Aviation Forecasts: Fiscal Years 1989-2000
1989-03-01
predict interim business cycles. FAA FORECAST ECONOMIC ASSUMPTIONS FISCAL YEARS 1989 - 2000 HISTORICAL FORECAST PERCENT AVERAGE ANNUAL GROWTH ECONOMIC ...During previous economic cycles, changes in the general aviation industry have generally paralleled changes in business activity. Empirical results have...FiFAA-APO 89- MARCH 198 US eat e T of 0rrs orci Fedra Aviatio Ad instato 0 NA II I1 Technical Report Documentation Page 1 ReotN.2. Government
2012-02-01
AFRL-RX-TY-TR-2012-0022 ANALYSIS OF COMMERCIALLY AVAILABLE HELMET AND BOOT OPTIONS FOR THE JOINT FIREFIGHTER INTEGRATED RESPONSE ENSEMBLE...Interim Technical Report 01-SEP-2010 -- 31-JAN-2011 Analysis of Commercially Available Firefighting Helmet and Boot Options for the Joint Firefighter...ensemble. A requirements correlation matrix was generated and sent to industry detailing objective and threshold measurements for both the helmet
Development of interim oak assessment guidelines for the silvah decision-support system
Patrick H. Brose
2007-01-01
Updates to the SILVAH decision-support system make it more applicable to the mixed oak forests of Pennsylvania and other mid-Atlantic states. This update required establishing interim inventory guidelines for assessing the competitive ability of advance oak regeneration. This assessment was complicated by oakâs growth strategy, emphasizing root development in lieu of...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH...
Science Opportunities Enabled by NASA's Constellation System: Interim Report
NASA Technical Reports Server (NTRS)
2008-01-01
In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies on two criteria: whether the concepts offered the potential for a significant scientific advance, and whether or not the concepts would benefit from the Constellation System. The committee determined that all of the concepts offered the possibility of a significant scientific advance, but it cautions that such an evaluation ultimately must be made by the decadal survey process, and it emphasizes that this interim report s evaluation should not be considered to be an endorsement of the scientific merit of these proposals, which must of course be evaluated relative to other proposals. The committee determined that seven of these concepts would benefit from the Constellation System, whereas four would not, but it stresses that this conclusion does not reflect an evaluation of the scientific merit of the projects, but rather an assessment of whether or not new capabilities provided by the Constellation System could significantly affect them. Some of the mission concepts, such as the Advanced Compton Telescope, already offer a significant scientific advance and fit easily within the mass and volume constraints of existing launch vehicles. Other mission concepts, such as the Palmer Quest proposal to drill through the Mars polar cap, are not constrained by the launch vehicle, but rather by other technology limitations. The committee evaluated the mission concepts as presented to it, aware nevertheless that proposing a far larger and more ambitious mission with the same science goals might be possible given the capabilities of the Ares V launch vehicle. (Such proposals can be submitted in response to the committee s request for information to be evaluated in its final report.) See Table S.1 for a summary of the Vision Missions, including their cost estimates, technical maturity, and reasons that they might benefit from the Constellation System. The committee developed several findings and recommendations.
Final Report: Characterization of Canister Mockup Weld Residual Stresses
DOE Office of Scientific and Technical Information (OSTI.GOV)
Enos, David; Bryan, Charles R.
2016-12-01
Stress corrosion cracking (SCC) of interim storage containers has been indicated as a high priority data gap by the Department of Energy (DOE) (Hanson et al., 2012), the Electric Power Research Institute (EPRI, 2011), the Nuclear Waste Technical Review Board (NWTRB, 2010a), and the Nuclear Regulatory Commission (NRC, 2012a, 2012b). Uncertainties exist in terms of the environmental conditions that prevail on the surface of the storage containers, the stress state within the container walls associated both with weldments as well as within the base metal itself, and the electrochemical properties of the storage containers themselves. The goal of the workmore » described in this document is to determine the stress states that exists at various locations within a typical storage canister by evaluating the properties of a full-diameter cylindrical mockup of an interim storage canister. This mockup has been produced using the same manufacturing procedures as the majority of the fielded spent nuclear fuel interim storage canisters. This document describes the design and procurement of the mockup and the characterization of the stress state associated with various portions of the container. It also describes the cutting of the mockup into sections for further analyses, and a discussion of the potential impact of the results from the stress characterization effort.« less
Rousseau, Joseph P.; Landa, Edward R.; Nimmo, John R.; Cecil, L. DeWayne; Knobel, LeRoy L.; Glynn, Pierre D.; Kwicklis, Edward M.; Curtis, Gary P.; Stollenwerk, Kenneth G.; Anderson, Steven R.; Bartholomay, Roy C.; Bossong, Clifford R.; Orr, Brennon R.
2005-01-01
The U.S. Department of Energy (DOE) requested that the U.S. Geological Survey conduct an independent technical review of the Interim Risk Assessment (IRA) and Contaminant Screening for the Waste Area Group 7 (WAG-7) Remedial Investigation, the draft Addendum to the Work Plan for Operable Unit 7-13/14 WAG-7 comprehensive Remedial Investigation and Feasibility Study (RI/FS), and supporting documents that were prepared by Lockheed Martin Idaho Technologies, Inc. The purpose of the technical review was to assess the data and geotechnical approaches that were used to estimate future risks associated with the release of the actinides americium, uranium, neptunium, and plutonium to the Snake River Plain aquifer from wastes buried in pits and trenches at the Subsurface Disposal Area (SDA). The SDA is located at the Radioactive Waste Management Complex in southeastern Idaho within the boundaries of the Idaho National Engineering and Environmental Laboratory. Radionuclides have been buried in pits and trenches at the SDA since 1957 and 1952, respectively. Burial of transuranic wastes was discontinued in 1982. The five specific tasks associated with this review were defined in a ?Proposed Scope of Work? prepared by the DOE, and a follow-up workshop held in June 1998. The specific tasks were (1) to review the radionuclide sampling data to determine how reliable and significant are the reported radionuclide detections and how reliable is the ongoing sampling program, (2) to assess the physical and chemical processes that logically can be invoked to explain true detections, (3) to determine if distribution coefficients that were used in the IRA are reliable and if they have been applied properly, (4) to determine if transport model predictions are technically sound, and (5) to identify issues needing resolution to determine technical adequacy of the risk assessment analysis, and what additional work is required to resolve those issues.
Tropopause sharpening by data assimilation
NASA Astrophysics Data System (ADS)
Pilch Kedzierski, R.; Neef, L.; Matthes, K.
2016-08-01
Data assimilation was recently suggested to smooth out the sharp gradients that characterize the tropopause inversion layer (TIL) in systems that did not assimilate TIL-resolving observations. We investigate whether this effect is present in the ERA-Interim reanalysis and the European Centre for Medium-Range Weather Forecasts (ECMWF) operational forecast system (which assimilate high-resolution observations) by analyzing the 4D-Var increments and how the TIL is represented in their data assimilation systems. For comparison, we also diagnose the TIL from high-resolution GPS radio occultation temperature profiles from the COSMIC satellite mission, degraded to the same vertical resolution as ERA-Interim and ECMWF operational analyses. Our results show that more recent reanalysis and forecast systems improve the representation of the TIL, updating the earlier hypothesis. However, the TIL in ERA-Interim and ECMWF operational analyses is still weaker and farther away from the tropopause than GPS radio occultation observations of the same vertical resolution.
Manufacturing Technology for Apparel Automation. Phases 1 and 2.
1987-07-15
Modularized Work Unit Groups . . . . . . . 12 i +,. :.Aooesston For :".. NTIS GR.AA1 ’- " "D T I C T A B Unannounced [] ~Justification i Availability...The monthly interim reports are summarized in this semiannual report. Activity to date has included work performed by Ms. Carol Carrere Dr. T. G. Clapp...Management. Provide, in accordance with paragraph 3.1 of the Statement of Work (SOW), North Carolina State University’s Technical Proposal, Manufacturing
2013-09-01
studies such as this one, and other research conducted in most recent decade. Of course, the housing designation ("not compatible with residential...such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...appear in the report, e.g. 001; AFAPL30480105. 6. AUTHOR(S). Enter name(s) of person(s) responsible for writing the report, performing the research
1981-01-01
NASA was already being incorporated by several equipment manufacturers in their own development plans. A-78-29. In the interim, amend 14 CFR to...not necessary. Research and development previously accomplished by the U.S. Army and by NASA was already being incorporated by several equipment...by industry., On July 12, our Bureau of Technology hosted a U.S. Army/FAA/ NASA meeting to brief FAA and NASA representatives, at the technical level
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham
The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, andmore » Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
... Government procurement. Mary Overstreet, Editor, Defense Acquisition Regulations System. Interim Rule Adopted... Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major Defense Acquisition...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the...
Orion EM-1 Interim Cryogenic Propulsion Stage (ICPS) move from HIF to DOC
2017-04-12
The Orion EM-1 Interim Cryogenic Propulsion Stage is moved from the Horizontal Integration Facility (HIF) to the Delta Operations Center (DOC) at Cape Canaveral Air Force Station to continue processing for it's future mission on the Space Launch System rocket.
Independent Orbiter Assessment (IOA): CIL issues resolution report, volume 1
NASA Technical Reports Server (NTRS)
Urbanowicz, Kenneth J.; Hinsdale, L. W.; Barnes, J. E.
1988-01-01
The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. This report contains IOA assessment worksheets showing resolution of outstanding IOA CIL issues that were summarized in the IOA FMEA/CIL Assessment Interim Report, dated 9 March 1988. Each assessment worksheet has been updated with CIL issue resolution and rationale. The NASA and Prime Contractor post 51-L FMEA/CIL documentation assessed is believed to be technically accurate and complete. No assessment issues remain that has safety implications. Volume 1 contain worksheets for the following sybsystems: Landing and Deceleration Subsystem; Purge, Vent and Drain Subsystem; Active Thermal Control and Life Support Systems; Crew Equipment Subsystem; Instrumentation Subsystem; Data Processing Subsystem; Atmospheric Revitalization Pressure Control Subsystem; Hydraulics and Water Spray Boiler Subsystem; and Mechanical Actuation Subsystem.
Naval facility energy conversion plants as resource recovery system components
NASA Astrophysics Data System (ADS)
Capps, A. G.
1980-01-01
This interim report addresses concepts for recovering energy from solid waste by using Naval facilities steam plants as principle building blocks of candidate solid waste/resource recovery systems at Navy installations. The major conclusions of this portion of the project are: although it is technically feasible to adapt Navy energy conversion systems to fire Waste Derived Fuels (WDF) in one or more of its forms, the optimal form selected should be a site-specific total system; near- to intermediate-term programs should probably continue to give first consideration to waterwall incinerators and to the cofiring of solid WDF in coal-capable plants; package incinerators and conversions of oil burning plants to fire a fluff form of solid waste fuel may be the options with the greatest potential for the intermediate term because waterwalls would be uneconomical in many small plants and because the majority of medium-sized oil-burning plants will not be converted to burn coal; and pyrolytic processes to produce gaseous and liquid fuels have not been sufficiently developed as yet to be specified for commerical operation.
Progress report on CCIR studies for guaranteeing access to the geostationary satellite orbit
NASA Astrophysics Data System (ADS)
Reinhart, E. E.
Overall responsibility for preparing a report on the technical information necessary for the World Administrative Radio Conference to be held in the spring of 1984 is vested in the Interim Working Party (IWP) 4/1. The various approaches being considered by the IWP 4/1 to guarantee orbital access are described, along with the criteria that the party has proposed for evaluating and comparing the approaches. These approaches include the following: a regional detailed long-term (10-20 years) a priori allotment plan, a periodically revised (3-5 years) regional detailed allotment plan, a regional or subregional allotment plan with guaranteed access, guaranteed access by means of multilateral coordination, and coordination procedures and technical factors that are revised periodically.
The Health Care System for Veterans: An Interim Report
2007-12-01
2 . REPORT TYPE 3. DATES COVERED 00-00-2007 to 00-00-2007 4. TITLE AND SUBTITLE The Health Care System for Veterans: An Interim Report 5a...com- prised of several clinical practice guidelines in the areas of ischemic heart disease, hypertension, diabetes mellitus , major depressive...disorder, schizophrenia, and tobacco use cessation . The percent compliance is an average of the separate indicators.” See Department of Veterans Affairs
Interim reliability evaluation program, Browns Ferry fault trees
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, M.E.
1981-01-01
An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.
Planning and Designing School Computer Facilities. Interim Report.
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Finance and Administration Div.
This publication provides suggestions and considerations that may be useful for school jurisdictions developing facilities for computers in schools. An interim report for both use and review, it is intended to assist school system planners in clarifying the specifications needed by the architects, other design consultants, and purchasers involved.…
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 2 2013-10-01 2013-10-01 false Periodic interim payments for skilled nursing facilities receiving payment under the skilled nursing facility prospective payment system for Part A...-STAGE RENAL DISEASE SERVICES; OPTIONAL PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 2 2012-10-01 2012-10-01 false Periodic interim payments for skilled nursing facilities receiving payment under the skilled nursing facility prospective payment system for Part A...-STAGE RENAL DISEASE SERVICES; OPTIONAL PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 2 2010-10-01 2010-10-01 false Periodic interim payments for skilled nursing facilities receiving payment under the skilled nursing facility prospective payment system for Part A...-STAGE RENAL DISEASE SERVICES; OPTIONAL PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 2 2011-10-01 2011-10-01 false Periodic interim payments for skilled nursing facilities receiving payment under the skilled nursing facility prospective payment system for Part A...-STAGE RENAL DISEASE SERVICES; OPTIONAL PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 2 2014-10-01 2014-10-01 false Periodic interim payments for skilled nursing facilities receiving payment under the skilled nursing facility prospective payment system for Part A...-STAGE RENAL DISEASE SERVICES; OPTIONAL PROSPECTIVELY DETERMINED PAYMENT RATES FOR SKILLED NURSING...
NASA Technical Reports Server (NTRS)
Reid, Concha M.
2011-01-01
Vehicles and stand-alone power systems that enable the next generation of human missions to the moon will require energy storage systems that are safer, lighter, and more compact than current state-of-the-art (SOA) aerospace quality lithium-ion (Li-ion) batteries. NASA is developing advanced Li-ion cells to enable or enhance future human missions to Near Earth Objects, such as asteroids, planets, moons, libration points, and orbiting structures. Advanced, high-performing materials are required to provide component-level performance that can offer the required gains at the integrated cell level. Although there is still a significant amount of work yet to be done, the present state of development activities has resulted in the synthesis of promising materials that approach the ultimate performance goals. This paper on interim progress of the development efforts will present performance of materials and cell components and will elaborate on the challenges of the development activities and proposed strategies to overcome technical issues.
1984-12-31
LII IH"L 5 B 1.4 1111.6 MICROCOPY RESOLUTION TEST CHART SECURITY CLASSIFICATION OF THIS PAGE (MS’ien Dare Itere d) RED DSTUC ONS REPORT ...DOCUMENTATION PAGE BEFORE COMPLETIG FORM R NUMER . GOVT ACCESSION NO 5. RECIPIENT’S CATALOG iUMBER • TR-09 4. TITLE ( nd Subttle) S. TYPE OF REPORT A PERIOD...COVERELs Applications of Piezoelectric and Pyroelectric Technical Report -Interim Thin Films: Opportunities for Langmuir-Blodgett Technology 6. PERFORMING
2013-09-01
hreatens the well being of our community, whether through noi se and emissions or the risk of accidents from an under- test ed and flawed design . The...such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...appear in the report, e.g. 001; AFAPL30480105. 6. AUTHOR(S). Enter name(s) of person(s) responsible for writing the report, performing the research
COCHISE Observations of Argon Rydberg Emission from 2 to 16 Micrometers.
1983-08-05
8217natu 5 I RNDALL E. M YJOHN S . GARIG Branch Cief Division Director Qualified requestors may obtain additional copies from the Defense Technical... S . TYPE or REPORT a PERIOD COVERED COCHISE OBSERVATIONS OF ARGON Scientific. Interim. RYDBERG EMISSION FROM 2 TO 16 6. PERFORMING 0140. REPORT NUMMER...Comparisons of obd~erved and simulated spectra sliow that s i.ntial ",WIR emission (- 1~gmm Arises from Rydberg states ert~ DO .W-1473 fDITION OF I NOV 65
1979-04-01
Buffalo Metropolitan Study Area. One of these is the Lake Plain, a relatively flat and fertile agricultural belt which is wide in the northern portion of...events. Evidence of this can be seen in numerous highway relocations where secondary roads follow stream courses closely. A field reconnaissance was made...shrub and tree growth encroaching on the high water stream channel can be seen immediately upstream of the eroding area. The SCS has provided technical
ERIC Educational Resources Information Center
Ausburn, Floyd B.
A U.S. Air Force study was designed to develop instruction based on the supplantation theory, in which tasks are performed (supplanted) for individuals who are unable to perform them due to their cognitive style. The study examined the effects of linear and multiple imagery in presenting a task requiring visual comparison and location to…
Public School Finance Problems in Texas. An Interim Report.
ERIC Educational Resources Information Center
Texas Research League, Austin.
The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…
The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...
The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...
75 FR 35510 - License Renewal Interim Staff Guidance Process, Revision 2 Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-22
... Related Regulatory Functions.'' An electronic copy of the revised LR-ISG process is available in the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession No. ML100920158. The revised LR-ISG... interim changes to certain NRC license renewal guidance documents. These guidance documents facilitate the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
... OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's Responsibility for Internal Control,'' and Suspension of Application of OMB Circular No. A-127, ``Financial Management Systems'' September 27, 2013. ACTION: Notice. SUMMARY: OMB Circular No. A-123, ``Management's...
2013-01-01
An injector needle is shown for each test in Figure 41. UNCLASSIFIED 37 UNCLASSIFIED Full Needle 60°C Ultra Low Sulfur Diesel 60°C...UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF...UNCLASSIFIED UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF
1995-10-01
BTEX on the shallow groundwater system at the site. Site history and the results of soil and groundwater investigations conducted previously are also...or predicted future, concentrations and distribution. Whether in conjunction with the interim 1 remedial action system already in place or not...L:\\45007\\st4 I rept\\st41 finl.doc D 0 • 0 • 0 0 0 0 • 6 FINAL 4 22 years, depending upon the effectiveness of the interim remedial action (IRA) system
Emulytics for Cyber-Enabled Physical Attack Scenarios: Interim LDRD Report of Year One Results.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clem, John; Urias, Vincent; Atkins, William Dee
Sandia National Laboratories has funded the research and development of a new capability to interactively explore the effects of cyber exploits on the performance of physical protection systems. This informal, interim report of progress summarizes the project’s basis and year one (of two) accomplishments. It includes descriptions of confirmed cyber exploits against a representative testbed protection system and details the development of an emulytics capability to support live, virtual, and constructive experiments. This work will support stakeholders to better engineer, operate, and maintain reliable protection systems.
Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.
Day, Roger S
2010-02-01
In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.
Evaluation of internal fit of interim crown fabricated with CAD/CAM milling and 3D printing system.
Lee, Wan-Sun; Lee, Du-Hyeong; Lee, Kyu-Bok
2017-08-01
This study is to evaluate the internal fit of the crown manufactured by CAD/CAM milling method and 3D printing method. The master model was fabricated with stainless steel by using CNC machine and the work model was created from the vinyl-polysiloxane impression. After scanning the working model, the design software is used to design the crown. The saved STL file is used on the CAD/CAM milling method and two types of 3D printing method to produce 10 interim crowns per group. Internal discrepancy measurement uses the silicon replica method and the measured data are analyzed with One-way ANOVA to verify the statistic significance. The discrepancy means (standard deviation) of the 3 groups are 171.6 (97.4) µm for the crown manufactured by the milling system and 149.1 (65.9) and 91.1 (36.4) µm, respectively, for the crowns manufactured with the two types of 3D printing system. There was a statistically significant difference and the 3D printing system group showed more outstanding value than the milling system group. The marginal and internal fit of the interim restoration has more outstanding 3D printing method than the CAD/CAM milling method. Therefore, the 3D printing method is considered as applicable for not only the interim restoration production, but also in the dental prosthesis production with a higher level of completion.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Winiarski, D.W.
1995-01-01
The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studiedmore » under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.« less
Simulator design for advanced ISDN satellite design and experiments
NASA Technical Reports Server (NTRS)
Pepin, Gerald R.
1992-01-01
This simulation design task completion report documents the simulation techniques associated with the network models of both the Interim Service ISDN (integrated services digital network) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures. The ISIS network model design represents satellite systems like the Advanced Communication Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) program, moves all control and switching functions on-board the next generation ISDN communication satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete events simulation experiments will be performed with these models using various traffic scenarios, design parameters and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunt, J.G.; Jenkins, R.G.; White, A.M.
1963-03-01
A number of ceramics, metallic compounds, and ceramic-metal composites were successfully hot pressed into the shape of die inserts. Steels were extruded through several of these for the purpose of evaluating the materials or to study methods of supporting the die inserts. Refractory metal inserts were also used in similar tests. Hot pressed inserts consisting of 80 vo1% Al/sub 2/O/ sub 3/--10 vol% W and 80 vol% ThO/sub 2/--10 vol% W cracked but did not erode. Sintered molybdenum inserts flowed excessively, whereas sintered tungsten inserts flowed to a lesser degree. A hard die casing with a slight shrink fit appearsmore » to be the most satisfactory method of support. (auth)« less
Nonmanufacturing Businesses. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
Cornog, June R.; Bunten, Elaine D.
In this fifth interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, a primary stratified sample of 2,828 nonmanufacturing firms was randomly selected from 28,184 businesses taken from Social Security files, a secondary sample of 2,258 firms was randomly selected for replacement…
The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...
The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...
NASA Astrophysics Data System (ADS)
Ahmed, F.; Dousa, J.; Hunegnaw, A.; Teferle, F. N.; Bingley, R.
2017-12-01
Integrated water vapor (IWV) derived from climate reanalysis models, such as the European Centre for Medium-range Weather Forecasts (ECMWF) ReAnalysis-Interim (ERA-Interim), is widely used in many atmospheric applications. Therefore, it is of interest to assess the quality of this reanalysis product using available observations. Observations from Global Navigation Satellite Systems (GNSS) are, as of now, available for a period of over 2 decades and their global availability makes it possible to validate the IWV obtained from climate reanalysis models in different geographical and climatic regions. In this study, primarily, three 5-year long homogeneously reprocessed GNSS-derived IWV datasets containing over 400 globally distributed ground-based GNSS stations have been used to validate the IWV estimates obtained from the ERA-Interim climate reanalysis model in 25 different climate zones. The IWV from ERA-Interim has been obtained by vertically integrating the specific humidity at all model levels above the locations of GNSS stations. It has been studied how the difference between the ERA-Interim IWV and the GNSS-derived IWV varies with respect to the different climate zones as well as with respect to the difference in the model orography and latitude. The results show a dependence of the ability of ERA-Interim to model the IWV on difference in climate types and latitude. This dependence, however, is dictated by the concentration of water vapor in different climate zones and at different latitudes. Furthermore, as a secondary focus of this study, the weighted mean atmospheric temperature (Tm) obtained from ERA-Interim has been compared to its equivalent obtained using two widely used approximations globally.
2013-10-03
: In the fiscal year (FY) 2014 inpatient prospective payment systems (IPPS)/long-term care hospital (LTCH) PPS final rule, we established the methodology for determining the amount of uncompensated care payments made to hospitals eligible for the disproportionate share hospital (DSH) payment adjustment in FY 2014 and a process for making interim and final payments. This interim final rule with comment period revises certain operational considerations for hospitals with Medicare cost reporting periods that span more than one Federal fiscal year and also makes changes to the data that will be used in the uncompensated care payment calculation in order to ensure that data from Indian Health Service (IHS) hospitals are included in Factor 1 and Factor 3 of that calculation.
76 FR 21109 - Rural Energy for America Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
...The Rural Business-Cooperative Service (Agency) is establishing an interim rule for the Rural Energy for America Program (REAP), which is authorized under the Food, Conservation, and Energy Act of 2008. This interim rule modifies the existing grant and guaranteed loan program for renewable energy systems and energy efficiency improvements. In addition, it adds a grant program for feasibility studies for renewable energy systems and a grant program for energy audits and renewable energy development assistance, as provided in the Food, Conservation, and Energy Act of 2008.
ERIC Educational Resources Information Center
Frazier, Don
The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…
Testimony of Nationally Representative Groups. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
As the 12th in a series of interim reports prepared for the United States Congress on the metric system, this study was authorized by law to reduce uncertainties concerning the issue of converting to metrication and to provide a better basis upon which the Congress may evaluate and resolve it. The testimony of over 230 nationally representative…
Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.
ERIC Educational Resources Information Center
National Bureau of Standards (DOC), Washington, DC.
This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bevard, Bruce Balkcom; Mertyurek, Ugur; Belles, Randy
The objective of this report is to identify issues and support documentation and identify and detail existing research on spent fuel dry storage; provide information to support potential R&D for the UKABWR (United Kingdom Advanced Boiling Water Reactor) Spent Fuel Interim Storage (SFIS) Pre-Construction Safety Report; and support development of answers to questions developed by the regulator. Where there are gaps or insufficient data, Oak Ridge National Laboratory (ORNL) has summarized the research planned to provide the necessary data along with the schedule for the research, if known. Spent nuclear fuel (SNF) from nuclear power plants has historically been storedmore » on site (wet) in spent fuel pools pending ultimate disposition. Nuclear power users (countries, utilities, vendors) are developing a suite of options and set of supporting analyses that will enable future informed choices about how best to manage these materials. As part of that effort, they are beginning to lay the groundwork for implementing longer-term interim storage of the SNF and the Greater Than Class C (CTCC) waste (dry). Deploying dry storage will require a number of technical issues to be addressed. For the past 4-5 years, ORNL has been supporting the U.S. Department of Energy (DOE) in identifying these key technical issues, managing the collection of data to be used in issue resolution, and identifying gaps in the needed data. During this effort, ORNL subject matter experts (SMEs) have become expert in understanding what information is publicly available and what gaps in data remain. To ensure the safety of the spent fuel under normal and frequent conditions of wet and subsequent dry storage, intact fuel must be shown to: 1.Maintain fuel cladding integrity; 2.Maintain its geometry for cooling, shielding, and subcriticality; 3.Maintain retrievability, and damaged fuel with pinhole or hairline cracks must be shown not to degrade further. Where PWR (pressurized water reactor) information is utilized or referenced, justification has been provided as to why the data can be utilized for BWR fuel.« less
Robertson, Ann; Cresswell, Kathrin; Takian, Amirhossein; Petrakaki, Dimitra; Crowe, Sarah; Cornford, Tony; Barber, Nicholas; Avery, Anthony; Fernando, Bernard; Jacklin, Ann; Prescott, Robin; Klecun, Ela; Paton, James; Lichtner, Valentina; Quinn, Casey; Ali, Maryam; Morrison, Zoe; Jani, Yogini; Waring, Justin; Marsden, Kate
2010-01-01
Objectives To describe and evaluate the implementation and adoption of detailed electronic health records in secondary care in England and thereby provide early feedback for the ongoing local and national rollout of the NHS Care Records Service. Design A mixed methods, longitudinal, multisite, socio-technical case study. Setting Five NHS acute hospital and mental health trusts that have been the focus of early implementation efforts and at which interim data collection and analysis are complete. Data sources and analysis Dataset for the evaluation consists of semi-structured interviews, documents and field notes, observations, and quantitative data. Qualitative data were analysed thematically with a socio-technical coding matrix, combined with additional themes that emerged from the data. Main results Hospital electronic health record applications are being developed and implemented far more slowly than was originally envisioned; the top-down, standardised approach has needed to evolve to admit more variation and greater local choice, which hospital trusts want in order to support local activity. Despite considerable delays and frustrations, support for electronic health records remains strong, including from NHS clinicians. Political and financial factors are now perceived to threaten nationwide implementation of electronic health records. Interviewees identified a range of consequences of long term, centrally negotiated contracts to deliver the NHS Care Records Service in secondary care, particularly as NHS trusts themselves are not party to these contracts. These include convoluted communication channels between different stakeholders, unrealistic deployment timelines, delays, and applications that could not quickly respond to changing national and local NHS priorities. Our data suggest support for a “middle-out” approach to implementing hospital electronic health records, combining government direction with increased local autonomy, and for restricting detailed electronic health record sharing to local health communities. Conclusions Experiences from the early implementation sites, which have received considerable attention, financial investment and support, indicate that delivering improved healthcare through nationwide electronic health records will be a long, complex, and iterative process requiring flexibility and local adaptability both with respect to the systems and the implementation strategy. The more tailored, responsive approach that is emerging is becoming better aligned with NHS organisations’ perceived needs and is, if pursued, likely to deliver clinically useful electronic health record systems. PMID:20813822
Science Opportunities Enabled by NASA's Constellation System: Interim Report
NASA Astrophysics Data System (ADS)
Committee On Science Opportunities Enabled By Nasa'S Constellation System, National Research Council
To begin implementation of the Vision for Space Exploration (recently renamed "United States Space Exploration Policy"), NASA has begun development of new launch vehicles and a human-carrying spacecraft that are collectively called the Constellation System. In November 2007, NASA asked the NRC to evaluate the potential for the Constellation System to enable new space science opportunities. For this interim report, 11 existing "Vision Mission" studies of advanced space science mission concepts inspired by earlier NASA forward-looking studies were evaluated. The focus was to assess the concepts and group them into two categories: more-deserving or less deserving of future study. This report presents a description of the Constellation System and its opportunities for enabling new space science opportunities, and a systematic analysis of the 11 Vision Mission studies. For the final report, the NRC issued a request for information to the relevant communities to obtain ideas for other mission concepts that will be assessed by the study committee, and several issues addressed only briefly in the interim report will be explored more fully.
R&D on Composition and Processing of Titanium Aluminide Alloys for Turbine Engines
1982-07-01
45433. AUTHORITY AFWAL ltr, 6 Feb 1987 THIS PAGE IS UNCLASSIFIED AFWAL-TR-82-4086 R&D ON COMPOSITION AND PROCESSING4 OF TITANIUM ALUMINIDE ALLOYS FOR...TR-82-4086- 4. TITLE (and Subitfle) S TYPE OF REPORT I PERIOO COVEREO R&D ON COMPOSITION AND PROCESSING OF Interim Technical Report TITANIUM ALUMINIDE ...ILLUSTRATIONS FICURE PACE 1 As-received titanium aluminide ingots supplied 9 by RMI. (a) S/N 20007; (b) left to right, S/N 20008, S/N 20009, S/N 20010
DOE Office of Scientific and Technical Information (OSTI.GOV)
Balkwill, D.L.; Reeves, R.H.
The present document is an interim technical report in which we describe the research which has been completed during the seven-month period since the start of the grant. Progress is summarized in two main areas. The first is microbiological characterization of subsurface materials from the Hanford reservation and the Idaho National Engineering Laboratory, and the second is phylogenetic characterization of these microorganisms. The major tools used for phylogenetic characterization are RFLP analysis of PCR derived material and 16S rRNA sequencing. A description of manuscripts ready for publication is also provided. 4 refs. (MHB)
2014-02-01
a 0.18 in thick polymer interlayer between two layers of 0.5 in tempered silica based “ soda lime ” glass . A 0.08 in shatter resistant film was...AFCEC-CX-TY-TR-2014-0005 ANALYSIS OF MULTIPLE-IMPACT BALLISTIC PERFORMANCE OF A TEMPERED GLASS LAMINATE WITH A STRIKE FACE FILM Michael A. Magrini...Interim Technical Report 3 JAN 2012 to 2 JAN 2013 Analysis of Multiple-Impact Ballistic Performance of A Tempered Glass Laminate with a Strike Face Film
Role Perceptions of Hispanic and Mainstream Navy Recruits.
1982-12-01
ACCESSION NO- 3. R9C’PI’NT’S CATALOG NUMBER 4. TITLE (and Subttl.e) S . TYPE of REPORT & PERIOO COVERED Role Perceptions of Hispanic and M4ainstream Interim...Technical Report Navy Recruits *. PERFORMING ORG. REPORT NUMBER 7. AUTHOR( s ) 6. CONTRACT OR GRANT NUMUER(a) Harry C. Triandis Judith Li3ansky Gerardo...T NU M E R S A Department of Psycholog~y University of Illinois NR 170-906 603 E. Daniel, Chamva.;vn, IL 6182__ II. CONTROLLING OFFICE NAME AND
Compulsory license for cable systems--Copyright Office, Library of Congress. Interim regulations.
1982-05-20
This notice is issued to inform the public that the Copyright Office of the Library of Congress is adopting interim amendments to 201.11 and 201.17 as amended on June 27, 1978 and July 3, 1980 respectively. These regulations implement portions of section 111 of the Copyright Act of 1976, title 17 of the United States Code. That section prescribes conditions under which cable systems may obtain a compulsory license to retransmit copyrighted works, including the filing of Notices of Identity and Signal Carriage Complement and Statements of Account, and the submission of statutory royalty fees. The effect of the amendments is to modify the filing requirements and royalty fee calculations necessitated by changes in the rules and regulations of the Federal Communications Commission. The amendments are issued on an interim basis in order to permit their immediate application while allowing full public comment.
MODTRAN: a moderate resolution model for LOWTRAN. Technical report, 12 May 1986-11 May 1987
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berk, A.; Bernstein, L.S.; Robertson, D.C.
1987-07-08
This interim technical report describes a new band-model formulation for the LOWTRAN 6 atmospheric transmittance/radiation computer code. Band-model parameters for H/sub 2/O, CO/sub 2/, O/sub 3/, CO, CH/sub 4/, O/sub 2/, and N/sub 2/ were calculated using the 1986 HITRAN line atlas. They were calculated for 1 /cm bins from 0 - 17,900/cm and at five temperatures from 200 to 300K. This transmittance model and associated subroutines were integrated into LOWTRAN 6. The spectral resolution of this new option is better than 5/cm (FWHM). A preliminary version of the code was delivered to AFGL for testing. Validation against FASCOD2 calculationsmore » will be the emphasis for the remainder of this effort.« less
Nondestructive Assay Data Integration with the SKB-50 Assemblies - FY16 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tobin, Stephen Joseph; Fugate, Michael Lynn; Trellue, Holly Renee
2016-10-28
A project to research the application of non-destructive assay (NDA) techniques for spent fuel assemblies is underway at the Central Interim Storage Facility for Spent Nuclear Fuel (for which the Swedish acronym is Clab) in Oskarshamn, Sweden. The research goals of this project contain both safeguards and non-safeguards interests. These nondestructive assay (NDA) technologies are designed to strengthen the technical toolkit of safeguard inspectors and others to determine the following technical goals more accurately; Verify initial enrichment, burnup, and cooling time of facility declaration for spent fuel assemblies; Detect replaced or missing pins from a given spent fuel assembly tomore » confirm its integrity; and Estimate plutonium mass and related plutonium and uranium fissile mass parameters in spent fuel assemblies. Estimate heat content, and measure reactivity (multiplication).« less
Basis for Interim Operation for Fuel Supply Shutdown Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENECKE, M.W.
2003-02-03
This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the currentmore » and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment, the form of the uranium, and the required controls, a Criticality Alarm System (CAS) is not required as allowed by DOE Order 420.1 (DOE 2000).« less
Natalie A. Bolon; Christopher S. Hansen-Murray; Richard W. Haynes
1995-01-01
Implications of the interim comprehensive strategy for improved Pacific salmon and steelhead habitat management (PACFISH) were estimated for those Bureau of Land Management (BLM) districts and National Forest System (NFS) lands west of the Rocky Mountains that have anadromous fish. The physical impacts and associated mitigation costs from implementing the PACFISH...
ERIC Educational Resources Information Center
What Works Clearinghouse, 2015
2015-01-01
The study authors examined the effects of using "Diagnostic Assessment Tools" ("DAT") on mathematics and reading outcomes for students in Indiana schools during the 2009-10 academic year. "DAT" consists of interim assessment tools--Wireless Generation's mCLASS for students in grades K-2 and CTB/ McGraw-Hill's Acuity…
ERIC Educational Resources Information Center
Markey, Karen; Demeyer, Anh N.
This research project focuses on the implementation and testing of the Dewey Decimal Classification (DDC) system as an online searcher's tool for subject access, browsing, and display in an online catalog. The research project comprises 12 activities. The three interim reports in this document cover the first seven of these activities: (1) obtain…
Interim Stabilization Equipment Essential and Support Drawing Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
KOCH, M.R.
The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.
Gade, Anne Lill; Ovrebø, Steinar; Hylland, Ketil
2008-07-01
The goal of REACH is the safe use of chemicals. This study examines the efficiency and usefulness of two draft technical guidance notes in the REACH Interim Project 3.2-2 for the development of the chemical safety report and exposure scenarios. A case study was carried out for a paint system for protection of structural steel. The focuses of the study were risk assessment of preparations based on Derived No Effect Level (DNEL) and Predicted No Effect Concentrations (PNEC) and on effective and accurate communication in the supply chain. Exposure scenarios and generic descriptions of uses, risk management measures, and exposure determinants were developed. The study showed that communication formats, software tools, and guidelines for chemical risk assessment need further adjustment to preparations and real-life situations. Web platforms may simplify such communication. The downstream formulator needs basic substance data from the substance manufacturer during the pre-registration phase to develop exposure scenarios for preparations. Default values need to be communicated in the supply chain because these were critical for the derivation of applicable risk management demands. The current guidelines which rely on the available toxicological knowledge are insufficient to advise downstream users on how to develop exposure scenarios for preparations.
2017-12-01
This final rule cancels the Episode Payment Models (EPMs) and Cardiac Rehabilitation (CR) Incentive Payment Model and rescinds the regulations governing these models. It also implements certain revisions to the Comprehensive Care for Joint Replacement (CJR) model, including: Giving certain hospitals selected for participation in the CJR model a one-time option to choose whether to continue their participation in the model; technical refinements and clarifications for certain payment, reconciliation and quality provisions; and a change to increase the pool of eligible clinicians that qualify as affiliated practitioners under the Advanced Alternative Payment Model (Advanced APM) track. An interim final rule with comment period is being issued in conjunction with this final rule in order to address the need for a policy to provide some flexibility in the determination of episode costs for providers located in areas impacted by extreme and uncontrollable circumstances.
In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.
Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang
2016-05-01
The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (P<.01 in each instance). A significantly smaller vertical marginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal discrepancies at the facial surface for the Jet interim crowns and with horizontal discrepancies at the lingual surface for the Caulk interim crowns. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Langton, Jennifer; Crampton, Peter
2008-04-18
To determine whether the three main funding formulas for Primary Health Organisations achieved a stated aim of the Primary Health Care Strategy to fund enrolled populations according to need. National data were obtained from the Ministry of Health for a 12-month period beginning in April 2004: these included demographic characteristics of the enrolled Primary Health Organisation population, plus rates tables for: First-Contact Services, Services to Improve Access, and Health Promotion. Funding for Access and Interim practices for four-quarters was calculated for each of these three funding streams. Analysis of the demographic characteristics of Access and Interim practices was undertaken. Maori and Pacific peoples made up a greater proportion of the Access population than the Interim, had higher rates of deprivation than the non-Maori/non-Pacific population, and demonstrated a younger age distribution. The first quarter (April 2004-June 2004) showed there was preferential funding for Access PHOs and in particular high-needs groups. In quarter two, this level of preferential funding had diminished, coinciding with the introduction of increased government funding for all Interim enrolees aged 65 and over. The greater funding for Access enrolees was notably eroded with the introduction of Access-level funding for those aged 65+ in Interim PHOs. Since these data were analysed all remaining Interim age groups have shifted to Access-level funding, benefiting non-Maori /non-Pacific in Interim PHOs. The rapid shift to Access-level funding for First Contact Services has seen a continued erosion of the redistributive effect of the original needs-based formulas. A system cannot be considered equitable if some members of society are not realising their health potential, and financing of primary care should remain redistributive until such a time as this objective is attained.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less
Estimating trends in atmospheric water vapor and temperature time series over Germany
NASA Astrophysics Data System (ADS)
Alshawaf, Fadwa; Balidakis, Kyriakos; Dick, Galina; Heise, Stefan; Wickert, Jens
2017-08-01
Ground-based GNSS (Global Navigation Satellite System) has efficiently been used since the 1990s as a meteorological observing system. Recently scientists have used GNSS time series of precipitable water vapor (PWV) for climate research. In this work, we compare the temporal trends estimated from GNSS time series with those estimated from European Center for Medium-Range Weather Forecasts (ECMWF) reanalysis (ERA-Interim) data and meteorological measurements. We aim to evaluate climate evolution in Germany by monitoring different atmospheric variables such as temperature and PWV. PWV time series were obtained by three methods: (1) estimated from ground-based GNSS observations using the method of precise point positioning, (2) inferred from ERA-Interim reanalysis data, and (3) determined based on daily in situ measurements of temperature and relative humidity. The other relevant atmospheric parameters are available from surface measurements of meteorological stations or derived from ERA-Interim. The trends are estimated using two methods: the first applies least squares to deseasonalized time series and the second uses the Theil-Sen estimator. The trends estimated at 113 GNSS sites, with 10 to 19 years temporal coverage, vary between -1.5 and 2.3 mm decade-1 with standard deviations below 0.25 mm decade-1. These results were validated by estimating the trends from ERA-Interim data over the same time windows, which show similar values. These values of the trend depend on the length and the variations of the time series. Therefore, to give a mean value of the PWV trend over Germany, we estimated the trends using ERA-Interim spanning from 1991 to 2016 (26 years) at 227 synoptic stations over Germany. The ERA-Interim data show positive PWV trends of 0.33 ± 0.06 mm decade-1 with standard errors below 0.03 mm decade-1. The increment in PWV varies between 4.5 and 6.5 % per degree Celsius rise in temperature, which is comparable to the theoretical rate of the Clausius-Clapeyron equation.
A web-based endpoint adjudication system for interim analyses in clinical trials.
Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis
2009-02-01
A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However, once these issues were resolved, the reviewers found the system user-friendly and easy to navigate. Web-based data adjudication depends upon expeditious data collection and verification. Further, ability to use web-based technologies, in addition to clinical expertise, must be considered in selecting EAC members. The automated nature of this system makes it a practical mechanism for ensuring timely endpoint adjudication. The authors believe a similar approach could be useful for handling endpoint adjudication for future clinical trials.
Analysis of Transportation Options for Commercial Spent Fuel in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena; Busch, Ingrid Karin
The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less
Publications of the Jet Propulsion Laboratory, January - December 1973. [bibliography
NASA Technical Reports Server (NTRS)
1974-01-01
Five classes of publications are included in this bibliography: (1) Technical Reports in which the information is complete for a specific accomplishment and is intended for a wide audience. (2) Articles from the bimonthly Deep Space Network Progress Report. Each volume's collection of articles presents a periodical survey of current accomplishments by the Deep Space Network. (3) Technical Memorandums, in which the information is complete for a specific accomplishment but is intended for a limited audience to satisfy unique requirements. (4) Articles from the JPL Quarterly Technical Review. Each article summarizes a recent important development, interim or final results, or an advancement in the state of the art in a scientific or engineering endeavor, This publication has been discontinued, and the issues indexed in this bibliography are the last to be published. (5) Articles published in the open literature. The publications are indexed by: (1) author, (2) subject, and (3) publication type and number. A descriptive entry appears under the name of each author of each publication; an abstract is included with the entry for the primary (first-listed) author.
Interim Cryogenic Propulsion Stage (ICPS) Handover Signing
2017-10-26
Meeting in the Launch Control Center of NASA's Kennedy Space Center in Florida, officials of the agency's Spacecraft/Payload Integration and Evolution (SPIE) organization formally turn over processing of the Space Launch System (SLS) rocket's Interim Cryogenic Propulsion Stage (ICPS) to the center's Ground Systems Development and Operations (GSDO) directorate. The ICPS is the first integrated piece of flight hardware to arrive in preparation for the uncrewed Exploration Mission-1. With the Orion attached, the ICPS sits atop the SLS rocket and will provide the spacecraft with the additional thrust needed to travel tens of thousands of miles beyond the Moon.
CIM's bridge from CADD to CAM: Data management requirements for manufacturing engineering
NASA Technical Reports Server (NTRS)
Ford, S. J.
1984-01-01
Manufacturing engineering represents the crossroads of technical data management in a Computer Integrated Manufacturing (CIM) environment. Process planning, numerical control programming and tool design are the key functions which translate information from as engineered to as assembled. In order to transition data from engineering to manufacturing, it is necessary to introduce a series of product interpretations which contain an interim introduction of technical parameters. The current automation of the product definition and the production process places manufacturing engineering in the center of CAD/CAM with the responsibility of communicating design data to the factory floor via a manufacturing model of the data. A close look at data management requirements for manufacturing engineering is necessary in order to establish the overall specifications for CADD output, CAM input, and CIM integration. The functions and issues associated with the orderly evolution of computer aided engineering and manufacturing are examined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, R.S.; Diamante, J.M.; Duffey, R.B.
1996-07-01
The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to processmore » high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.« less
ERIC Educational Resources Information Center
Alaska Office of the Governor, Juneau.
In 1987, the Governor of Alaska's Interim Commission on Children and Youth was given two tasks: (1) to develop a plan for a first-class child care system for working parents statewide that is workable, fair and sensibly integrates with the public schools; and (2) to produce a comprehensive plan to combat the problems facing Alaskans so they are…
Conduct of the Persian Gulf Conflict: An Interim Report to Congress
1991-07-01
a danger that we will assume that this war is a paradigm for the next, that subconsciously we’ll presume all future wars can be relatively pain free...CENTCOM. The experience elicited arecmmndtin o hagethe threshold for reprogram - JSTARS was an integral part of the system used to recommendation to...This Includes the realignment, reprogramming , or transfer of funds appropriated for activities unrelated to the Persian Gulf conflict. Interim Report
1988-01-01
MONITORING ORGANIZATION Northeast Artificial (If applicaole)nelincCostum(AcRome Air Development Center (COCU) Inteligence Consortium (NAIC)I 6c. ADDRESS...f, Offell RADC-TR-88-1 1, Vol IV (of eight) Interim Technical ReportS June 1988 NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM ANNUAL REPORT 1986...13441-5700 EMENT NO NO NO ACCESSION NO62702F 5 8 71 " " over) I 58 27 13 " TITLE (Include Security Classification) NORTHEAST ARTIFICIAL INTELLIGENCE
Storage for greater-than-Class C low-level radioactive waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beitel, G.A.
1991-12-31
EG and G Idaho, Inc., at the Idaho National Engineering Laboratory (INEL) is actively pursuing technical storage alternatives for greater-than-Class C low-level radioactive waste (GTCC LLW) until a suitable licensed disposal facility is operating. A recently completed study projects that between 2200 and 6000 m{sup 3} of GTCC LLW will be generated by the year 2035; the base case estimate is 3250 m{sup 3}. The current plan envisions a disposal facility available as early as the year 2010. A long-term dedicated storage facility could be available in 1997. In the meantime, it is anticipated that a limited number of sealedmore » sources that are no longer useful and have GTCC concentrations of radionuclides will require storage. Arrangements are being made to provide this interim storage at an existing DOE waste management facility. All interim stored waste will subsequently be moved to the dedicated storage facility once it is operating. Negotiations are under way to establish a host site for interim storage, which may be operational, at the earliest, by the second quarter of 1993. Two major activities toward developing a long-term dedicated storage facility are ongoing. (a) An engineering study, which explores costs for alternatives to provide environmentally safe storage and satisfy all regulations, is being prepared. Details of some of the findings of that study will be presented. (b) There is also an effort under way to seek the assistance of one or more private companies in providing dedicated storage. Alternatives and options will be discussed.« less
Huckfeldt, Peter J; Sood, Neeraj; Escarce, José J; Grabowski, David C; Newhouse, Joseph P
2014-03-01
Medicare continues to implement payment reforms that shift reimbursement from fee-for-service toward episode-based payment, affecting average and marginal payment. We contrast the effects of two reforms for home health agencies. The home health interim payment system in 1997 lowered both types of payment; our conceptual model predicts a decline in the likelihood of use and costs, both of which we find. The home health prospective payment system in 2000 raised average but lowered marginal payment with theoretically ambiguous effects; we find a modest increase in use and costs. We find little substantive effect of either policy on readmissions or mortality. Copyright © 2014 Elsevier B.V. All rights reserved.
Huckfeldt, Peter J; Sood, Neeraj; Escarce, José J; Grabowski, David C; Newhouse, Joseph P
2014-01-01
Medicare continues to implement payment reforms that shift reimbursement from fee-for-service towards episode-based payment, affecting average and marginal payment. We contrast the effects of two reforms for home health agencies. The Home Health Interim Payment System in 1997 lowered both types of payment; our conceptual model predicts a decline in the likelihood of use and costs, both of which we find. The Home Health Prospective Payment System in 2000 raised average but lowered marginal payment with theoretically ambiguous effects; we find a modest increase in use and costs. We find little substantive effect of either policy on readmissions or mortality. PMID:24395018
NASA Astrophysics Data System (ADS)
Vergados, P.; Mannucci, A. J.; Ao, C. O.; Jiang, J. H.; Su, H.
2015-01-01
The spatial variability of the tropical tropospheric relative humidity (RH) throughout the vertical extent of the troposphere is examined using Global Positioning System Radio Occultation (GPSRO) observations from the Constellation Observing System for Meteorology, Ionosphere and Climate (COSMIC) mission. These high vertical resolution observations capture the detailed structure and moisture budget of the Hadley Cell circulation. We compare the COSMIC observations with the European Center for Medium-range Weather Forecast (ECMWF) Re-Analysis Interim (ERA-Interim) and the Modern-Era Retrospective analysis for Research and Applications (MERRA) climatologies. Qualitatively, the spatial pattern of RH in all data sets matches up remarkably well, capturing distinct features of the general circulation. However, RH discrepancies exist between ERA-Interim and COSMIC data sets, which are noticeable across the tropical boundary layer. Specifically, ERA-Interim shows a drier Inter Tropical Convergence Zone (ITCZ) by 15-20% compared both to COSMIC and MERRA data sets, but this difference decreases with altitude. Unlike ECMWF, MERRA shows an excellent agreement with the COSMIC observations except above 400 hPa, where GPSRO observations capture drier air by 5-10%. RH climatologies were also used to evaluate intraseasonal variability. The results indicate that the tropical middle troposphere at ±5-25° is most sensitive to seasonal variations. COSMIC and MERRA data sets capture the same magnitude of the seasonal variability, but ERA-Interim shows a weaker seasonal fluctuation up to 10% in the middle troposphere inside the dry air subsidence regions of the Hadley Cell. Over the ITCZ, RH varies by maximum 9% between winter and summer.
NASA Astrophysics Data System (ADS)
Vergados, P.; Mannucci, A. J.; Ao, C. O.; Jiang, J. H.; Su, H.
2015-04-01
The spatial variability of the tropical tropospheric relative humidity (RH) throughout the vertical extent of the troposphere is examined using Global Positioning System Radio Occultation (GPSRO) observations from the Constellation Observing System for Meteorology, Ionosphere, and Climate (COSMIC) mission. These high vertical resolution observations capture the detailed structure and moisture budget of the Hadley Cell circulation. We compare the COSMIC observations with the European Center for Medium-range Weather Forecast (ECMWF) Reanalysis Interim (ERA-Interim) and the Modern-Era Retrospective analysis for Research and Applications (MERRA) climatologies. Qualitatively, the spatial pattern of RH in all data sets matches up remarkably well, capturing distinct features of the general circulation. However, RH discrepancies exist between ERA-Interim and COSMIC data sets that are noticeable across the tropical boundary layer. Specifically, ERA-Interim shows a drier Intertropical Convergence Zone (ITCZ) by 15-20% compared to both COSMIC and MERRA data sets, but this difference decreases with altitude. Unlike ECMWF, MERRA shows an excellent agreement with the COSMIC observations except above 400 hPa, where GPSRO observations capture drier air by 5-10%. RH climatologies were also used to evaluate intraseasonal variability. The results indicate that the tropical middle troposphere at ±5-25° is most sensitive to seasonal variations. COSMIC and MERRA data sets capture the same magnitude of the seasonal variability, but ERA-Interim shows a weaker seasonal fluctuation up to 10% in the middle troposphere inside the dry air subsidence regions of the Hadley Cell. Over the ITCZ, RH varies by maximum 9% between winter and summer.
NASA Technical Reports Server (NTRS)
2008-01-01
NASA requested that a committee under the auspices of the National Research Council's Aeronautics and Space Engineering Board carry out an assessment of NASA's Exploration Technology Development Program (ETDP). Organizationally, this program functions under the direction of NASA's Exploration Systems Mission Directorate and is charged with developing new technologies that will enable NASA to conduct future human and robotic exploration missions, while reducing mission risk and cost. The Committee to Review NASA's Exploration Technology Development Program has been tasked to examine how well the program is aligned with the stated objectives of the President's Vision for Space Exploration (VSE), to identify gaps in the program, and to assess the quality of the research. The full statement of task is given in Appendix A. The committee consists of 25 members and includes a cross section of senior executives, engineers, researchers, and other aerospace professionals drawn from industry, universities, and government agencies with expertise in virtually all the technical fields represented within the program.
76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
ERIC Educational Resources Information Center
Jackson, Robert W. B.
This second interim report on declining enrollment in Ontario identifies the major implications of the several factors associated with declining enrollments and makes recommendations for immediate action to contribute to the stability of the system while preparing and initiating long-term policies. The first part of the report deals with…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.
Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)
NASA Technical Reports Server (NTRS)
Kenney, G. P.
1975-01-01
The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.
How well do Reanalysis represent polar lows?
NASA Astrophysics Data System (ADS)
Zappa, G.; Shaffrey, L.; Hodges, K.
2013-12-01
Polar lows are intense maritime mesocyclones forming at high latitudes during polar air outbreaks. The associated high surface winds can be an important cause of coastal damage.They also seem to play a relevant role in the climate system by modulating the oceanic surface heat fluxes. This creates strong interest in understanding whether modern reanalysis datasets are able to represent polar lows, as well as how their representation may be sensitive to the model resolution. In this talk we investigate how ERA-Interim reanalysis represents the polar lows identified by the Norwegian meteorological services and listed in the STARS (Combination of Sea Surface Temperature and AltimeteR Synergy) dataset for the period 2002-2011. The sensitivity to resolution is explored by comparing ERA-Interim to the ECMWF operational analyses (2008-2011), which have three times higher horizontal resolution compared to ERA-Interim. We show that ERAI-Interim has excellent ability to capture the observed polar lows events with up to 90% of the observed events being found in the reanalysis. However, ERA-Interim tends to have polar lows of weaker dynamical intensity, in terms of both winds and vorticity, and with less spatial structure than in the ECMWF operational analyses (See Fig 1). Furthermore, we apply an objective feature tracking algorithm to the 3 hourly vorticity at 850 hPa with constraints on vorticity intensity and atmospheric static stability to objectively identify polar lows in the ERA-Interim reanalysis. We show that for the stronger polar lows the objective climatology shows good agreement with the STARS dataset over the 2002-2011 period. This allows us to extend the polar lows climatology over the whole ERA Interim period. Differences with another reanalysis product (NCEP-CFSR) will be also discussed. Fig 1: Composite of the tangential wind speed at 925 hPa for 34 polar lows observed in the Norwegian sea between 2008-2010 as represented by the ERA-Interim reanalysis (left) and by the ECMWF Operational analysis (right). Positive values indicate cyclonic circulation. The composite is centered on the polar low vorticity maxima and it is presented for a radial cap of 5 degrees of radius on the sphere (~550Km).
Parallel Architectures for Planetary Exploration Requirements (PAPER)
NASA Astrophysics Data System (ADS)
Cezzar, Ruknet
1993-08-01
The project's main contributions have been in the area of student support. Throughout the project, at least one, in some cases two, undergraduate students have been supported. By working with the project, these students gained valuable knowledge involving the scientific research project, including the not-so-pleasant reporting requirements to the funding agencies. The other important contribution was towards the establishment of a graduate program in computer science at Hampton University. Primarily, the PAPER project has served as the main research basis in seeking funds from other agencies, such as the National Science Foundation, for establishing a research infrastructure in the department. In technical areas, especially in the first phase, we believe the trip to Jet Propulsion Laboratory, and gathering together all the pertinent information involving experimental computer architectures aimed for planetary explorations was very helpful. Indeed, if this effort is to be revived in the future due to congressional funding for planetary explorations, say an unmanned mission to Mars, our interim report will be an important starting point. In other technical areas, our simulator has pinpointed and highlighted several important performance issues related to the design of operating system kernels for MIMD machines. In particular, the critical issue of how the kernel itself will run in parallel on a multiple-processor system has been addressed through the various ready list organization and access policies. In the area of neural computing, our main contribution was an introductory tutorial package to familiarize the researchers at NASA with this new and promising field zone axes (20). Finally, we have introduced the notion of reversibility in programming systems which may find applications in various areas of space research.
Parallel Architectures for Planetary Exploration Requirements (PAPER)
NASA Technical Reports Server (NTRS)
Cezzar, Ruknet
1993-01-01
The project's main contributions have been in the area of student support. Throughout the project, at least one, in some cases two, undergraduate students have been supported. By working with the project, these students gained valuable knowledge involving the scientific research project, including the not-so-pleasant reporting requirements to the funding agencies. The other important contribution was towards the establishment of a graduate program in computer science at Hampton University. Primarily, the PAPER project has served as the main research basis in seeking funds from other agencies, such as the National Science Foundation, for establishing a research infrastructure in the department. In technical areas, especially in the first phase, we believe the trip to Jet Propulsion Laboratory, and gathering together all the pertinent information involving experimental computer architectures aimed for planetary explorations was very helpful. Indeed, if this effort is to be revived in the future due to congressional funding for planetary explorations, say an unmanned mission to Mars, our interim report will be an important starting point. In other technical areas, our simulator has pinpointed and highlighted several important performance issues related to the design of operating system kernels for MIMD machines. In particular, the critical issue of how the kernel itself will run in parallel on a multiple-processor system has been addressed through the various ready list organization and access policies. In the area of neural computing, our main contribution was an introductory tutorial package to familiarize the researchers at NASA with this new and promising field zone axes (20). Finally, we have introduced the notion of reversibility in programming systems which may find applications in various areas of space research.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Favalli, Andrea; Vo, D.; Grogan, Brandon R.
The purpose of the Next Generation Safeguards Initiative (NGSI)–Spent Fuel (SF) project is to strengthen the technical toolkit of safeguards inspectors and/or other interested parties. The NGSI–SF team is working to achieve the following technical goals more easily and efficiently than in the past using nondestructive assay measurements of spent fuel assemblies: (1) verify the initial enrichment, burnup, and cooling time of facility declaration; (2) detect the diversion or replacement of pins; (3) estimate the plutonium mass [which is also a function of the variables in (1)]; (4) estimate the decay heat; and (5) determine the reactivity of spent fuelmore » assemblies. Since August 2013, a set of measurement campaigns has been conducted at the Central Interim Storage Facility for Spent Nuclear Fuel (Clab), in collaboration with Swedish Nuclear Fuel and Waste Management Company (SKB). One purpose of the measurement campaigns was to acquire passive gamma spectra with high-purity germanium and lanthanum bromide scintillation detectors from Pressurized Water Reactor and Boiling Water Reactor spent fuel assemblies. The absolute 137Cs count rate and the 154Eu/ 137Cs, 134Cs/ 137Cs, 106Ru/ 137Cs, and 144Ce/ 137Cs isotopic ratios were extracted; these values were used to construct corresponding model functions (which describe each measured quantity’s behavior over various combinations of burnup, cooling time, and initial enrichment) and then were used to determine those same quantities in each measured spent fuel assembly. Furthermore, the results obtained in comparison with the operator declared values, as well as the methodology developed, are discussed in detail in the paper.« less
Favalli, Andrea; Vo, D.; Grogan, Brandon R.; ...
2016-02-26
The purpose of the Next Generation Safeguards Initiative (NGSI)–Spent Fuel (SF) project is to strengthen the technical toolkit of safeguards inspectors and/or other interested parties. The NGSI–SF team is working to achieve the following technical goals more easily and efficiently than in the past using nondestructive assay measurements of spent fuel assemblies: (1) verify the initial enrichment, burnup, and cooling time of facility declaration; (2) detect the diversion or replacement of pins; (3) estimate the plutonium mass [which is also a function of the variables in (1)]; (4) estimate the decay heat; and (5) determine the reactivity of spent fuelmore » assemblies. Since August 2013, a set of measurement campaigns has been conducted at the Central Interim Storage Facility for Spent Nuclear Fuel (Clab), in collaboration with Swedish Nuclear Fuel and Waste Management Company (SKB). One purpose of the measurement campaigns was to acquire passive gamma spectra with high-purity germanium and lanthanum bromide scintillation detectors from Pressurized Water Reactor and Boiling Water Reactor spent fuel assemblies. The absolute 137Cs count rate and the 154Eu/ 137Cs, 134Cs/ 137Cs, 106Ru/ 137Cs, and 144Ce/ 137Cs isotopic ratios were extracted; these values were used to construct corresponding model functions (which describe each measured quantity’s behavior over various combinations of burnup, cooling time, and initial enrichment) and then were used to determine those same quantities in each measured spent fuel assembly. Furthermore, the results obtained in comparison with the operator declared values, as well as the methodology developed, are discussed in detail in the paper.« less
Remediation management of complex sites using an adaptive site management approach.
Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula
2017-12-15
Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
NASA Astrophysics Data System (ADS)
Shi, Chunhua; Huang, Ying; Guo, Dong; Zhou, Shunwu; Hu, Kaixi; Liu, Yu
2018-05-01
The South Asian High (SAH) has an important influence on atmospheric circulation and the Asian climate in summer. However, current comparative analyses of the SAH are mostly between reanalysis datasets and there is a lack of sounding data. We therefore compared the climatology, trends and abrupt changes in the SAH in the Japanese 55-year Reanalysis (JRA-55) dataset, the National Centers for Environmental Prediction Climate Forecast System Reanalysis (NCEP-CFSR) dataset, the European Center for Medium-Range Weather Forecasts Reanalysis Interim (ERA-interim) dataset and radiosonde data from China using linear analysis and a sliding t-test. The trends in geopotential height in the control area of the SAH were positive in the JRA-55, NCEP-CFSR and ERA-interim datasets, but negative in the radiosonde data in the time period 1979-2014. The negative trends for the SAH were significant at the 90% confidence level in the radiosonde data from May to September. The positive trends in the NCEP-CFSR dataset were significant at the 90% confidence level in May, July, August and September, but the positive trends in the JRA-55 and ERA-Interim were only significant at the 90% confidence level in September. The reasons for the differences in the trends of the SAH between the radiosonde data and the three reanalysis datasets in the time period 1979-2014 were updates to the sounding systems, changes in instrumentation and improvements in the radiation correction method for calculations around the year 2000. We therefore analyzed the trends in the two time periods of 1979-2000 and 2001-2014 separately. From 1979 to 2000, the negative SAH trends in the radiosonde data mainly agreed with the negative trends in the NCEP-CFSR dataset, but were in contrast with the positive trends in the JRA-55 and ERA-Interim datasets. In 2001-2014, however, the trends in the SAH were positive in all four datasets and most of the trends in the radiosonde and NCEP-CFSR datasets were significant. It is therefore better to use the NCEP-CFSR dataset than the JRA-55 and ERA-Interim datasets when discussing trends in the SAH.
ICPSU Install onto Mobile Launcher
2018-03-16
A heavy-lift crane slowly lifts the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) high up for installation on the tower of the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher
2018-03-16
A crane and rigging lines are used to install the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) high up on the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
Construction workers with JP Donovan assist with preparations to lift and install the Interim Cryogenic Propulsion Stage Umbilical on the tower of the mobile launcher at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher
2018-03-16
Construction workers with JP Donovan install the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) at about the 240-foot-level of the mobile launcher (ML) tower at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher
2018-03-16
A heavy-lift crane slowly lifts the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) up for installation on the tower of the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
The mobile launcher (ML) tower is lit up before early morning sunrise at NASA's Kennedy Space Center in Florida. Preparations are underway to lift and install the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) at about the 240-foot-level on the tower. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
2016-08-22
We are revising the Medicare hospital inpatient prospective payment systems (IPPS) for operating and capital-related costs of acute care hospitals to implement changes arising from our continuing experience with these systems for FY 2017. Some of these changes will implement certain statutory provisions contained in the Pathway for Sustainable Growth Reform Act of 2013, the Improving Medicare Post-Acute Care Transformation Act of 2014, the Notice of Observation Treatment and Implications for Care Eligibility Act of 2015, and other legislation. We also are providing the estimated market basket update to apply to the rate-of-increase limits for certain hospitals excluded from the IPPS that are paid on a reasonable cost basis subject to these limits for FY 2017. We are updating the payment policies and the annual payment rates for the Medicare prospective payment system (PPS) for inpatient hospital services provided by long-term care hospitals (LTCHs) for FY 2017. In addition, we are making changes relating to direct graduate medical education (GME) and indirect medical education payments; establishing new requirements or revising existing requirements for quality reporting by specific Medicare providers (acute care hospitals, PPS-exempt cancer hospitals, LTCHs, and inpatient psychiatric facilities), including related provisions for eligible hospitals and critical access hospitals (CAHs) participating in the Electronic Health Record Incentive Program; updating policies relating to the Hospital Value-Based Purchasing Program, the Hospital Readmissions Reduction Program, and the Hospital-Acquired Condition Reduction Program; implementing statutory provisions that require hospitals and CAHs to furnish notification to Medicare beneficiaries, including Medicare Advantage enrollees, when the beneficiaries receive outpatient observation services for more than 24 hours; announcing the implementation of the Frontier Community Health Integration Project Demonstration; and making technical corrections and changes to regulations relating to costs to related organizations and Medicare cost reports; we are providing notice of the closure of three teaching hospitals and the opportunity to apply for available GME resident slots under section 5506 of the Affordable Care Act. We are finalizing the provisions of interim final rules with comment period that relate to a temporary exception for certain wound care discharges from the application of the site neutral payment rate under the LTCH PPS for certain LTCHs; application of two judicial decisions relating to modifications of limitations on redesignation by the Medicare Geographic Classification Review Board; and legislative extensions of the Medicare-dependent, small rural hospital program and changes to the payment adjustment for low-volume hospitals.
2015-12-01
institutional review board (IRB)-approved sequence was established for Delphi panel participants. The collection of data from the Delphi panel...The following year, the Office of the Inspector General Audit Division within the U.S. Department of Justice (DOJ) released an interim report on the...iacp_uaguidelines.pdf 11 Department of Justice, Office of the Inspector General, Audit Division, Interim Report on the Department of Justice’s Use and Support of
The development of an interim generalized gate logic software simulator
NASA Technical Reports Server (NTRS)
Mcgough, J. G.; Nemeroff, S.
1985-01-01
A proof-of-concept computer program called IGGLOSS (Interim Generalized Gate Logic Software Simulator) was developed and is discussed. The simulator engine was designed to perform stochastic estimation of self test coverage (fault-detection latency times) of digital computers or systems. A major attribute of the IGGLOSS is its high-speed simulation: 9.5 x 1,000,000 gates/cpu sec for nonfaulted circuits and 4.4 x 1,000,000 gates/cpu sec for faulted circuits on a VAX 11/780 host computer.
Durability of geosynthetics for highway applications : interim report
DOT National Transportation Integrated Search
2003-06-01
BRT will utilize Intelligent Transportation System (ITS) technology, modern land use planning and transportation policies to support new concepts for rapid transit systems based on bus-like vehicles. The success of some of these pioneering systems, s...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jenkins, R.G.; Siergiej, J.M.
1962-12-28
In a program to develop a complete manufacturing process for ihe production of beryllium channels, techniques are being sought for drawing to obtain a flnal product meeting specifications more rigorous than are obtainable by direct extrusion. Progress in designing and procuring the special tooling required to draw complex shapes at elevated temperature is described, and the flrst set of draw dies is evaluated with respect to design and quality. Three experimental draw attempts have been made on U-channels, in addition to draw tests on flats. (auth)
Environmental DNA calibration study. Interim technical review report
Baerwaldt, K.; Bartron, Meredith L.; Schilling, K.; Lee, Debbie; Russo, Edmond; Estes, Trudy; Fischer, Richard; Fleming, Beth; Guilfoyle, Michael P.; Kilgore, K. Jack; Lance, Richard; Perkins, Edward; Schultz, Martin; Smith, David; Amberg, Jon J.; Chapman, Duane C.; Gaikowski, Mark P.; Klymus, Katy E.; Richter, Catherine A.
2014-01-01
Should a sustainable Asian carp population become established in the Great Lakes, native fish populations, as well as many threatened or endangered plant/animal species populations, could be impacted. In response to this threat, the Asian Carp Regional Control Committee (ACRCC) was formed in part to coordinate efforts to understand and organize against the Asian carp threat. The Asian Carp Control Strategy Framework (2012a) outlined major tasks to be completed for a better understanding of factors related to the advance of Asian carp populations towards the Great Lakes. In addition, the ACRCC formed the Monitoring and Rapid Response Workgroup to address Asian carp monitoring and removal (ACRCC 2012b).
Scientific and Technical Information Policy of the Federal Republic of Germany
NASA Astrophysics Data System (ADS)
Tamura, Koji
The gist and the background of “Specialized Information Program 1985-1988”, which was decided by the Federal government of Germany in June 1985, were outlined in comparison with the interim report of the fiscal year 1986. In the previous program “I & D” from 1974 to 1977, the establishment of GID (Association for Information and Documentation) and the consolidation of Specialized Information Centers (FIZ) were main object. However, in the new program, the role sharing between government and private enterprises was emphasized with a view to stimulate information demand in the circumstance of cooperation and competition of the world market.
Safe Passage Data Analysis: Interim Report
DOT National Transportation Integrated Search
1993-04-01
The purpose of this report is to describe quantitatively the costs and benefits of screener : proficiency evaluation and reporting systems (SPEARS) equipment, particularly computer-based : instruction (CBI) systems, compared to current methods of tra...
NASA Astrophysics Data System (ADS)
Alshawaf, Fadwa; Dick, Galina; Heise, Stefan; Balidakis, Kyriakos; Schmidt, Torsten; Wickert, Jens
2017-04-01
Ground-based GNSS (Global Navigation Satellite Systems) have efficiently been used since the 1990s as a meteorological observing system. Recently scientists used GNSS time series of precipitable water vapor (PWV) for climate research although they may not be sufficiently long. In this work, we compare the trend estimated from GNSS time series with that estimated from European Center for Medium-RangeWeather Forecasts Reanalysis (ERA-Interim) data and meteorological measurements.We aim at evaluating climate evolution in Central Europe by monitoring different atmospheric variables such as temperature and PWV. PWV time series were obtained by three methods: 1) estimated from ground-based GNSS observations using the method of precise point positioning, 2) inferred from ERA-Interim data, and 3) determined based on daily surface measurements of temperature and relative humidity. The other variables are available from surface meteorological stations or received from ERA-Interim. The PWV trend component estimated from GNSS data strongly correlates (>70%) with that estimated from the other data sets. The linear trend is estimated by straight line fitting over 30 years of seasonally-adjusted PWV time series obtained using the meteorological measurements. The results show a positive trend in the PWV time series with an increase of 0.2-0.7 mm/decade with a mean standard deviations of 0.016 mm/decade. In this paper, we present the results at three GNSS stations. The temporal increment of the PWV correlates with the temporal increase in the temperature levels.
NASA Technical Reports Server (NTRS)
Vanschalkwyk, Christiaan Mauritz
1991-01-01
Many applications require that a control system must be tolerant to the failure of its components. This is especially true for large space-based systems that must work unattended and with long periods between maintenance. Fault tolerance can be obtained by detecting the failure of the control system component, determining which component has failed, and reconfiguring the system so that the failed component is isolated from the controller. Component failure detection experiments that were conducted on an experimental space structure, the NASA Langley Mini-Mast are presented. Two methodologies for failure detection and isolation (FDI) exist that do not require the specification of failure modes and are applicable to both actuators and sensors. These methods are known as the Failure Detection Filter and the method of Generalized Parity Relations. The latter method was applied to three different sensor types on the Mini-Mast. Failures were simulated in input-output data that were recorded during operation of the Mini-Mast. Both single and double sensor parity relations were tested and the effect of several design parameters on the performance of these relations is discussed. The detection of actuator failures is also treated. It is shown that in all the cases it is possible to identify the parity relations directly from input-output data. Frequency domain analysis is used to explain the behavior of the parity relations.
Advanced Exploration Systems Water Architecture Study Interim Results
NASA Technical Reports Server (NTRS)
Sargusingh, Miriam J.
2013-01-01
The mission of the Advanced Exploration System (AES) Water Recovery Project (WRP) is to develop advanced water recovery systems that enable NASA human exploration missions beyond low Earth orbit (LEO). The primary objective of the AES WRP is to develop water recovery technologies critical to near-term missions beyond LEO. The secondary objective is to continue to advance mid-readiness-level technologies to support future NASA missions. An effort is being undertaken to establish the architecture for the AES Water Recovery System (WRS) that meets both near- and long-term objectives. The resultant architecture will be used to guide future technical planning, establish a baseline development roadmap for technology infusion, and establish baseline assumptions for integrated ground and on-orbit Environmental Control and Life Support Systems definition. This study is being performed in three phases. Phase I established the scope of the study through definition of the mission requirements and constraints, as well as identifying all possible WRS configurations that meet the mission requirements. Phase II focused on the near-term space exploration objectives by establishing an International Space Station-derived reference schematic for long-duration (>180 day) in-space habitation. Phase III will focus on the long-term space exploration objectives, trading the viable WRS configurations identified in Phase I to identify the ideal exploration WRS. The results of Phases I and II are discussed in this paper.
NASA Astrophysics Data System (ADS)
Di Giuseppe, F.; Tompkins, A. M.; Lowe, R.; Dutra, E.; Wetterhall, F.
2012-04-01
As the quality of numerical weather prediction over the monthly to seasonal leadtimes steadily improves there is an increasing motivation to apply these fruitfully to the impacts sectors of health, water, energy and agriculture. Despite these improvements, the accuracy of fields such as temperature and precipitation that are required to drive sectoral models can still be poor. This is true globally, but particularly so in Africa, the region of focus in the present study. In the last year ECMWF has been particularly active through EU research founded projects in demonstrating the capability of its longer range forecasting system to drive impact modeling systems in this region. A first assessment on the consequences of the documented errors in ECMWF forecasting system is therefore presented here looking at two different application fields which we found particularly critical for Africa - vector-born diseases prevention and hydrological monitoring. A new malaria community model (VECTRI) has been developed at ICTP and tested for the 3 target regions participating in the QWECI project. The impacts on the mean malaria climate is assessed using the newly realized seasonal forecasting system (Sys4) with the dismissed system 3 (Sys3) which had the same model cycle of the up-to-date ECMWF re-analysis product (ERA-Interim). The predictive skill of Sys4 to be employed for malaria monitoring and forecast are also evaluated by aggregating the fields to country level. As a part of the DEWFORA projects, ECMWF is also developing a system for drought monitoring and forecasting over Africa whose main meteorological input is precipitation. Similarly to what is done for the VECTRI model, the skill of seasonal forecasts of precipitation is, in this application, translated into the capability of predicting drought while ERA-Interim is used in monitoring. On a monitoring level, the near real-time update of ERA-Interim could compensate the lack of observations in the regions. However, ERA-Interim suffers from biases and drifts that limit its application for drought monitoring purposes in some regions.
Han, Beth; Remsburg, Robin E
2005-01-01
Using data from the 1996 and 2000 National Home and Hospice Care Surveys (N = 2,455), we examined length of use in home care among patients with Medicare-only payment source before and during the Medicare interim payment system (IPS). Logistic regression analyses revealed that patients were 2.9 times more likely to be discharged within 60 days during IPS than before IPS. The impact of Medicare IPS on length of use in home care among patients with Medicare only was stronger than what the existing literature indicates, which combines Medicare patients with multiple payment sources and patients with Medicare-only together.
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
ICPSU Install onto Mobile Launcher
2018-03-16
The mobile launcher (ML) is reflected in the sunglasses of a construction worker with JP Donovan at NASA's Kennedy Space Center in Florida. A crane is lifting the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) up for installation on the tower of the ML. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
A construction worker with JP Donovan helps prepare the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) for installation high up on the tower of the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical will be located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
Construction workers with JP Donovan attach a heavy-lift crane to the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) to prepare for lifting and installation on the mobile launcher (ML) tower at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical will be located at about the 240-foot-level of the ML and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
NASA's Space Launch Transitions: From Design to Production
NASA Technical Reports Server (NTRS)
Askins, Bruce; Robinson, Kimberly
2016-01-01
NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.
ERIC Educational Resources Information Center
Anyaso, Hilary Hurd
2009-01-01
The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…
40 CFR 155.56 - Interim registration review decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...
Decadal variability of surface solar radiation over China
NASA Astrophysics Data System (ADS)
Wang, K.
2015-12-01
Observations show that national average surface solar radiation (Rs) decreased by -8.0 W m-2 per decade from 1960 to 1990 and sharply increased from 1990 to 1993. However, none of the state-of-the-art climate models can reproduce such decrease/increase of Rs. This study shows that Rs observations over China have significant inhomogeneity. Before 1989, Rs was calculated as a sum of direct (Rsdir) and diffuse (Rsdif) solar radiation observations measured by pyrheliometers and shaded pyranometers separately. Due to technical limitations and irregular calibration, pyranometers before 1990 had a strong sensitivity drift problem, which introduced crucial spurious decreasing trends into Rsdif and Rs data. From 1990 to 1993, instruments and measurement methods were replaced and measuring stations were restructured in China, which resulted in an abrupt increase in the observed Rs. Rs calculated from Sunshine duration (SunDu) provide a reliable reference in assessing decadal variability of Rs. SunDu derived Rs have no sensitivity drift problem because of its daily changed recording material. SunDu-derived Rs averaged over China decreased by -2.9 W m-2 per decade from 1961 to 1990, and had a negligible trend afterward. During the period of 1994-2012 when Rs observations were free of inhomogeneity mentioned above, the observed and SunDu-derived Rs consistently show a negligible trend, being less than 0.1 W m-2 per decade. These trends can be reproduced by high-quality CMIP5 Earth System Models (ESM). This level of agreement is due to the incorporation of a near real emission inventory of atmospheric aerosols by CMIP5 ESMs. Rs from ERA-Interim has a good agreement with SunDu-derived Rs. However, ERA-interim does not allow aerosol loading to change annually. ERA-Interim Rs shows an unreliable increasing trend of 1.9 W m-2 per decade from 1990 to 2013 because it does not include the impact of recent increased atmospheric aerosols over China. GEWEX Rs calculated from ISCCP cloud products show a significant but erratic decreasing trend of -3.1 W m-2 per decade from 1983 to 2007 over China. The ISCCP cloud products aggregate cloud observations from polar orbit and geostationary satellites directly, which introduced to inhomogeneity to ISCCP cloud and GEWEX Rs products.
17 CFR 210.8-03 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...
7 CFR 1738.21 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...
Drago, Carl
2016-08-01
The purpose of this report was to retrospectively evaluate implant and immediate full-arch prosthesis survival rates over a 24-month period; patients were consecutively treated with immediate occlusal loading. Dental arch, gender, and implant orientation (vertical vs. tilted) were also noted. All Brånemark System implants (Nobel Active) and interim, all-acrylic resin prostheses placed in patients following an All-on-Four™ protocol, in a single private practice were assessed by retrospective patient chart review. The amount of space provided surgically for implant restorative components and prostheses was determined from measurements of the vertical heights of the interim prostheses in the right/left anterior and posterior segments. These measurements were made in the laboratory. Interim prosthetic repairs (type, frequency, length of time from insertion) were analyzed by type, arch, gender, and implant orientation. Implant survival and insertion torque values were also measured. Inclusion criteria consisted of all Brånemark System implants placed with the All-on-Four protocol from September 1, 2011, until August 31, 2013. Specific dietary instructions were given for the first 7 days immediately postoperatively and for the weeks prior to insertion of the definitive prostheses. One hundred twenty-nine patients, comprising 191 arches (766 implants) from September 1, 2011, until August 31, 2013, were included in the study. One patient experienced implant failure yielding an overall implant survival rate (SR) of 99.5% (762 of 766). Four hundred twenty-six of 430 maxillary implants and 336 of 336 mandibular implants survived for SRs of 99.1% and 100%, respectively. Regarding implant orientation, 415 of 417 tilted implants (SR 99.5%) and 343 of 345 (CSR 95.6%) vertical implants were noted to be clinically stable. Interim, all-acrylic resin prostheses were in place for a mean of 199.2 days; mandibular prostheses were in place for an average of 195.4 days; maxillary prostheses were in place for an average of 202.0 days. Thirty four of the 191 interim prostheses (17.8%) warranted at least one repair during the treatment period. The average overall implant insertion torque value was 60.74 Ncm; mandibular torque values averaged 63.08 Ncm; maxillary torque values averaged 59.00 Ncm. The results from this study suggest that dental arch, gender, and implant orientation for implants placed and immediately restored with interim, all-acrylic resin, full-arch prostheses per the All-on-Four protocol did not have significant statistical or clinical effects on prosthetic complications of the interim prostheses or implant survival. Only one of the 129 patients experienced implant failures, indicating that the All-on-Four treatment protocol used in this study is a viable alternative to other protocols for rehabilitating edentulous patients. © 2015 by the American College of Prosthodontists.
NASA Astrophysics Data System (ADS)
Byrd, G.; Coleman, S.; Werneth, C.
2003-12-01
Our AY101 course has large enrollments. There are the usual attendance problems with students putting off studying until just before major exams, with predictable consequences. We (myself, faculty, Werneth, grad student, and Coleman, undergrad) describe our experience with one strategy to actively involve students: cooperatively answering quiz questions. We tried a solution during our May 2002 Interim term. Classes of three hours/day over three weeks make mid-class breaks essential! Before breaks, we presented a short multiple choice, open book/note quiz answered after break. Quizzes could increase grades, e.g. A- to an A, without excessively diluting importance of closed-book major exams. Comparing Interim 2002 final exams to Interim 2001, the average was 80%, much better than the 2001 class's 57%. The 2002 students interacted with one another more. Attendance was over 90%. During a regular semester, handing out and taking up papers would take up much time during the more frequent and larger classes. It's more interesting if students vote for different answers together then revealing the correct answer. Toward these ends, I obtained a grant for a "Classroom Performance System," a computer receiver unit, 128 ``TV remote" response pads and software for creating quizzes. Spring 2003, three teachers tried out the system in a trial fashion. To compare, we used the system during Interim 2003. Ease of giving quizzes and grading permitted a shorter 5 question quiz during break with another at class end totaling of 27 quizzes (almost one/day for a regular semester's Tuesday/Thursday class). Improvement was maintained with a slight 3 % increase. We used the CPS for events such as the recent Mars close approach. Kids of all ages like to check their understanding with a few questions. We created a web site where the students can interactively review questions and other materials, http://ay101.garnetsigma.com/index.html
47 CFR 51.611 - Interim wholesale rates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...
7 CFR 15a.71 - Interim procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...
7 CFR 1735.75 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2013 CFR
2013-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
NASA Astrophysics Data System (ADS)
Wang, Junhong; Zhang, Liangying; Lin, Po-Hsiung; Bradford, Mark; Cole, Harold; Fox, Jack; Hock, Terry; Lauritsen, Dean; Loehrer, Scot; Martin, Charlie; Vanandel, Joseph; Weng, Chun-Hsiung; Young, Kathryn
2010-11-01
During the THORPEX (The Observing System Research and Predictability Experiment) Pacific Asian Regional Campaign (T-PARC), from 1 August to 30 September 2008, ˜1900 high-quality, high vertical resolution soundings were collected over the Pacific Ocean. These include dropsondes deployed from four aircrafts and zero-pressure balloons in the stratosphere (NCAR's Driftsonde system). The water vapor probability distribution and spatial variability in the northern subtropical Pacific (14°-20°N, 140°E-155°W) are studied using Driftsonde and COSMIC (Constellation Observing System for Meteorology, Ionosphere, and Climate) data and four global reanalysis products. Driftsonde data analysis shows distinct differences of relative humidity (RH) distributions in the free troposphere between the Eastern and Western Pacific (EP and WP, defined as east and west of 180°, respectively), very dry with a single peak of ˜1% RH in the EP and bi-modal distributions in the WP with one peak near ice saturation and one varying with altitude. The frequent occurrences of extreme dry air are found in the driftsonde data with 59% and 19% of RHs less than or equal to 5% and at 1% at 500 hPa in the EP, respectively. RH with respect to ice in the free troposphere exhibits considerable longitudinal variations, very low (<20%) in the EP, but varying from 20% to 100% in the WP. Inter-comparisons of Driftsonde, COSMIC and reanalysis data show generally good agreement among the Driftsonde, COSMIC, ECMWF Reanalysis-Interim (ERA-Interim) and Japanese Reanalysis (JRA) below 200 hPa. The ERA-Interim and JRA are approved to be successful on describing RH frequency distributions and spatial variations in the region. The comparisons also reveal problems in Driftsonde, two National Center for Environmental Prediction (NCEP) reanalyses and COSMIC data. The moist layer at 200-100 hPa in the WP shown in the ERA-Interim, JRA and COSMIC is missing in Driftsonde data. Major problems are found in the RH means and variability over the study region for both NCEP reanalyses. Although the higher-moisture layer at 200-100 hPa in the WP in the COSMIC data agrees well with the ERA-Interim and JRA, it is primarily attributed to the first guess of the 1-Dimensional (1D) variational analysis used in the COSMIC retrieval rather than the refractivity measurements. The limited soundings (total 268) of Driftsonde data are capable of portraying RH probability distributions and longitudinal variability. This implies that Driftsonde system has the potential to become a valuable operational system for upper air observations over the ocean.
Geographic information system development in the CARETS project
Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.
1977-01-01
Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.
DOT National Transportation Integrated Search
1995-05-01
KEYWORDS : ADVANCED VEHICLE CONTROL & SAFETY SYSTEMS OR AVCSS, COLLISION WARNING/AVOIDANCE SYSTEMS, CRASH REDUCTION, INTELLIGENT VEHICLE INITIATIVE OR IVI : RESULTS FROM THE TESTING OF ELEVEN COLLISION AVOIDANCE SYSTEMS (CAS) FOR LANE CHANGE, ...
AES Water Architecture Study Interim Results
NASA Technical Reports Server (NTRS)
Sarguisingh, Miriam J.
2012-01-01
The mission of the Advanced Exploration System (AES) Water Recovery Project (WRP) is to develop advanced water recovery systems in order to enable NASA human exploration missions beyond low earth orbit (LEO). The primary objective of the AES WRP is to develop water recovery technologies critical to near term missions beyond LEO. The secondary objective is to continue to advance mid-readiness level technologies to support future NASA missions. An effort is being undertaken to establish the architecture for the AES Water Recovery System (WRS) that meets both near and long term objectives. The resultant architecture will be used to guide future technical planning, establish a baseline development roadmap for technology infusion, and establish baseline assumptions for integrated ground and on-orbit environmental control and life support systems (ECLSS) definition. This study is being performed in three phases. Phase I of this study established the scope of the study through definition of the mission requirements and constraints, as well as indentifying all possible WRS configurations that meet the mission requirements. Phase II of this study focused on the near term space exploration objectives by establishing an ISS-derived reference schematic for long-duration (>180 day) in-space habitation. Phase III will focus on the long term space exploration objectives, trading the viable WRS configurations identified in Phase I to identify the ideal exploration WRS. The results of Phases I and II are discussed in this paper.
12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...
PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEDESCHI AR
This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technologymore » summary, reported in RPP-RPT-37740.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 219 and 252 [DFARS Case... System AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Interim rule... Supplement (DFARS) to conform to the Federal Acquisition Regulation (FAR) by providing Department of Defense...
NASA Astrophysics Data System (ADS)
Fortkamp, Jonathan C.
Current needs in the nuclear industry and movements in the political arena indicate that authorization may soon be given for development of a federal interim storage facility for spent nuclear fuel. The initial stages of the design work have already begun within the Department of Energy and are being reviewed by the Nuclear Regulatory Commission. This dissertation addresses the radiation environment around an interim spent nuclear fuel storage facility. Specifically the dissertation characterizes the radiation dose rates around the facility based on a design basis source term, evaluates the changes in dose due to varying cask spacing configurations, and uses these results to define some applicable health physics principles for the storage facility. Results indicate that dose rates from the facility are due primarily from photons from the spent fuel and Co-60 activation in the fuel assemblies. In the modeled cask system, skyshine was a significant contribution to dose rates at distances from the cask array, but this contribution can be reduced with an alternate cask venting system. With the application of appropriate health physics principles, occupation doses can be easily maintained far below regulatory limits and maintained ALARA.
DOUBLE TRACKS Test Site interim corrective action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarilymore » of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.« less
NASA Technical Reports Server (NTRS)
1979-01-01
Structural analysis and certification of the collector system is presented. System verification against the interim performance criteria is presented and indicated by matrices. The verification discussion, analysis, and test results are also given.
Rural applications of advanced traveler information systems : recommended actions
DOT National Transportation Integrated Search
1997-07-01
The Recommended Action Plan is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. Based on the investigation of user needs, a technology review, and concept development and assessm...
Water Demand Management Strategies and Challenges in the Upper Colorado River Basin
NASA Astrophysics Data System (ADS)
Kuhn, R. E.
2016-12-01
Under the 1922 Colorado River Compact, the Upper Basin (Colorado, New Mexico, Utah, and Wyoming) has flow obligations at Lee Ferry to downstream states and Mexico. The Colorado River Storage Project Act (CRSPA) of 1956 led to the construction of four large storage reservoirs. These provide river regulation to allow the Upper Basin to meet its obligations. Lake Powell, the largest and most important, and Lake Mead are now operated in a coordinated manner under the 2007 Interim Guidelines. Studies show that at current demand levels and if the hydrologic conditions the Basin has experienced since the mid-1980s continue or get drier, reservoir operations, alone, may not provide the necessary water to meet the Upper Basin's obligations. Therefore, the Upper Basin states are now studying demand management strategies that will reduce consumptive uses when total system reservoir storage reaches critically low levels. Demand management has its own economic, political and technical challenges and limitations and will provide new opportunities for applied research. This presentation will discuss some of those strategies, their challenges, and the kinds of information that research could provide to inform demand management.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...
Interim Administrators in Higher Education: A National Study
ERIC Educational Resources Information Center
Huff, Marie Thielke; Neubrander, Judy
2015-01-01
The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... the interim rule. Contractor business systems and internal controls are the first line of defense... contractor's accounting system shall provide for management reviews or internal audits of the contractor's... controls as part of any evaluation as to the reliability of information produced by a business system(s...
NASA Astrophysics Data System (ADS)
Sharifi, Ehsan; Steinacker, Reinhold; Saghafian, Bahram
2016-04-01
Precipitation is a critical component of the Earth's hydrological cycle. The primary requirement in precipitation measurement is to know where and how much precipitation is falling at any given time. Especially in data sparse regions with insufficient radar coverage, satellite information can provide a spatial and temporal context. Nonetheless, evaluation of satellite precipitation is essential prior to operational use. This is why many previous studies are devoted to the validation of satellite estimation. Accurate quantitative precipitation estimation over mountainous basins is of great importance because of their susceptibility to hazards. In situ observations over mountainous areas are mostly limited, but currently available satellite precipitation products can potentially provide the precipitation estimation needed for meteorological and hydrological applications. One of the newest and blended methods that use multi-satellites and multi-sensors has been developed for estimating global precipitation. The considered data set known as Integrated Multi-satellitE Retrievals (IMERG) for GPM (Global Precipitation Measurement) is routinely produced by the GPM constellation satellites. Moreover, recent efforts have been put into the improvement of the precipitation products derived from reanalysis systems, which has led to significant progress. One of the best and a worldwide used model is developed by the European Centre for Medium Range Weather Forecasts (ECMWF). They have produced global reanalysis daily precipitation, known as ERA-Interim. This study has evaluated one year of precipitation data from the GPM-IMERG and ERA-Interim reanalysis daily time series over West of Iran. IMERG and ERA-Interim yield underestimate the observed values while IMERG underestimated slightly and performed better when precipitation is greater than 10mm. Furthermore, with respect to evaluation of probability of detection (POD), threat score (TS), false alarm ratio (FAR) and probability of false detection (POFD) IMERG yields a better value of POD, TS, FAR and POFD in comparison to era-Interim. Overall, ERA-Interim product produced fewer robust results when compared to IMERG.
Education and career progression of imaging administrators.
South-Winter, Carole
2014-01-01
The advancement into leadership positions for many administrators began as staff technologists moving up via interim management opportunities. New managers must develop supervisory skills while simultaneously assuming responsibility for the operation of the department. Mobility today is based primarily on a formal educational background. A transferable set of skills must be augmented with higher education. Those in the imaging sciences realize that an administrative position requires business and management acumen as well as technical skills. A shortage of imaging administrators is predicted due to an aging population and the rapid advancement of technology in healthcare. Institutes of higher education need to address and support the curricula and programs needed, which includes the CRA credential, for this growing field.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-26
...The Department of State is issuing this interim final rule amending the International Traffic in Arms Regulations (ITAR) relating to brokers and brokering activities and to related provisions of the ITAR. These amendments clarify registration requirements, the scope of brokering activities, prior approval requirements and exemptions, procedures for obtaining prior approval and guidance, and reporting and recordkeeping of such activities. Conforming and technical changes are made to other parts of the ITAR that affect export as well as brokering activities. The revisions contained in this rule are part of the Department of State's retrospective plan under E.O. 13563 completed on August 17, 2011.
40 CFR 280.11 - Interim prohibition for deferred UST systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...
40 CFR 280.11 - Interim prohibition for deferred UST systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...
40 CFR 280.11 - Interim prohibition for deferred UST systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...
40 CFR 280.11 - Interim prohibition for deferred UST systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...
40 CFR 280.11 - Interim prohibition for deferred UST systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Will prevent releases due to corrosion or structural failure for the operational life of the UST system; (2) Is cathodically protected against corrosion, constructed of noncorrodible material, steel clad... substance. (b) Notwithstanding paragraph (a) of this section, an UST system without corrosion protection may...
NASA's Space Launch System Transitions From Design To Production
NASA Technical Reports Server (NTRS)
Askins, Bruce R.; Robinson, Kimberly F.
2016-01-01
NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.
The IRIS-GUS Shuttle Borne Upper Stage System
NASA Technical Reports Server (NTRS)
Tooley, Craig; Houghton, Martin; Bussolino, Luigi; Connors, Paul; Broudeur, Steve (Technical Monitor)
2002-01-01
This paper describes the Italian Research Interim Stage - Gyroscopic Upper Stage (IRIS-GUS) upper stage system that will be used to launch NASA's Triana Observatory from the Space Shuttle. Triana is a pathfinder earth science mission being executed on rapid schedule and small budget, therefore the mission's upper stage solution had to be a system that could be fielded quickly at relatively low cost and risk. The building of the IRIS-GUS system wa necessary because NASA lost the capability to launch moderately sized upper stage missions fro the Space Shuttle when the PAM-D system was retired. The IRIS-GUS system restores this capability. The resulting system is a hybrid which mates the existing, flight proven IRIS (Italian Research Interim Stage) airborne support equipment to a new upper stage, the Gyroscopic Upper Stage (GUS) built by the GSFC for Triana. Although a new system, the GUS exploits flight proven hardware and design approaches in most subsystems, in some cases implementing proven design approaches with state-of-the-art electronics. This paper describes the IRIS-GUS upper stage system elements, performance capabilities, and payload interfaces.
Interim Cryogenic Propulsion Stage (ICPS) Transport from DOC to
2017-07-26
Packed inside its canister, the Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket arrives at the low bay entrance of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) Transport from DOC to
2017-07-26
Packed inside its canister, the Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is being transported to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) Transport from DOC to
2017-07-26
Packed inside its canister, the Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is moved into the low bay entrance of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
MUC-4 Test Results and Analysis
1992-01-01
PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 MUC3 MUC4 STEMS 15,285 INFLECTED FORMS 14,56 1 TOTALS est at 10,000...34 . As an indication of system development during MUC4 , we can compare our TST3 results with our results on th e MUC-4 interim test (TST2) . The relevant... MUC4 Interim Test) Summary Scores SLOT POS ACT COR PAR INC ICR IPA SPU MIS NON REC PRE OVG inc-total 529 1189 160 63 24 0 23 942 282 718 36 16 79 perp
Mobile satellite service for Canada
NASA Technical Reports Server (NTRS)
Sward, David
1988-01-01
The Mobile Satellite (MSAT) system and a special program designed to provide interim mobile satellite services (IMSS) during the construction phase of MSAT are described. A mobile satellite system is a key element in extending voice and and data telecommunications to all Canadians.
Proof of concept deployment plan.
DOT National Transportation Integrated Search
2008-02-01
The U.S. Department of Transportation (USDOT) Next Generation 9-1-1 (NG9-1-1) : Proof-of-Concept (POC) demonstration is envisioned to test key features and : functionalities of the NG9-1-1 system. The Interim POC System Design Document : defines the ...
DOT National Transportation Integrated Search
1993-10-01
This document describes the Concept of Operations and Generic System Requirements for : the next generation of Traffic Management Centers (TMC). Four major steps comprise the : development of this Concept of Operations. The first step was to survey t...
42 CFR 418.307 - Periodic interim payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...
75 FR 3178 - Defense Federal Acquisition Regulation Supplement; Lead System Integrators
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
... Government procurement. Amy G. Williams, Editor, Defense Acquisition Regulations System. 0 Accordingly, the..., without change, an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to... limitations on the award of new contracts for lead system integrator functions in the acquisition of major DoD...
Academically Creative Education: An Interim Report.
ERIC Educational Resources Information Center
Southwest Virginia Community Coll., Richlands, VA.
An overview is provided of activities undertaken by Southwest Virginia Community College and the Russell County School System to provide a cost-effective delivery system for education/enrichment opportunities for gifted seniors in rural high schools that lack the "critical mass" to sustain individual on-site programs. The delivery system used an…
Study of Man-Machine Communications Systems for the Handicapped. Interim Report.
ERIC Educational Resources Information Center
Kafafian, Haig
Newly developed communications systems for exceptional children include Cybercom; CYBERTYPE; Cyberplace, a keyless keyboard; Cyberphone, a telephonic communication system for deaf and speech impaired persons; Cyberlamp, a visual display; Cyberview, a fiber optic bundle remote visual display; Cybersem, an interface for the blind, fingerless, and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip
Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less
Implementation of Geostar's RDSS system
NASA Technical Reports Server (NTRS)
Lepkowski, Ronald J.
1990-01-01
The Geostar (Trademark) system began its initial operations in 1988 and was the first domestic satellite system to provide regular service to mobile users within the United States. Here, an overview is given of Geostar's radiodetermination satellite system (RDSS) concept and its development by Geostar, with a focus on the current operational status of Geostar's interim RDSS system and services.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-13
... call-for-aid is a system designed to provide elderly residents the opportunity to call for help in the... open. This bars that are change also rewrites designed to open the Level 3 should open. If they...
DOT National Transportation Integrated Search
2004-02-17
This document presents the results of the analysis of baseline, or "pre-enhancement," data describing the operation of the existing 511 telephone traveler information system operated by the Arizona Department of Transportation (ADOT). The model deplo...
Rural applications of advanced traveler information systems : user needs and technology assessment
DOT National Transportation Integrated Search
1997-07-01
The User Needs and Technology Assessment Report is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. The document describes the research design and findings from rural traveler su...
Measuring nursing essential contributions to quality patient care outcomes.
Wolgast, Kelly A; Taylor, Katherine; Garcia, Dawn; Watkins, Miko
2011-01-01
Workload Management System for Nursing (WMSN) is a core Army Medical Department business system that has provided near real-time, comprehensive nursing workload and manpower data for decision making at all levels for over 25 years. The Army Manpower Requirements and Documentation Agency populates data from WMSN into the Manpower Staffing Standards System (Inpatient module within Automated Staffing Assessment Model). The current system, Workload Management System for Nursing Internet (WMSNi), is an interim solution that requires additional functionalities for modernization and integration at the enterprise level. The expanding missions and approved requirements for WMSNi support strategic initiatives on the Army Medical Command balanced scorecard and require continued sustainment for multiple personnel and manpower business processes for both inpatient and outpatient nursing care. This system is currently being leveraged by the TRICARE Management Activity as an interim multiservice solution, and is being used at 24 Army medical treatment facilities. The evidenced-based information provided to Army decision makers through the methods used in the WMSNi will be essential across the Army Medical Command throughout the system's life cycle.
NASA Astrophysics Data System (ADS)
Vergados, Panagiotis; Mannucci, Anthony J.; Ao, Chi O.; Verkhoglyadova, Olga; Iijima, Byron
2018-03-01
We construct a 9-year data record (2007-2015) of the tropospheric specific humidity using Global Positioning System radio occultation (GPS RO) observations from the Constellation Observing System for Meteorology, Ionosphere, and Climate (COSMIC) mission. This record covers the ±40° latitude belt and includes estimates of the zonally averaged monthly mean specific humidity from 700 up to 400 hPa. It includes three major climate zones: (a) the deep tropics (±15°), (b) the trade winds belts (±15-30°), and (c) the subtropics (±30-40°). We find that the RO observations agree very well with the European Centre for Medium-Range Weather Forecasts Re-Analysis Interim (ERA-Interim), the Modern-Era Retrospective Analysis for Research and Applications (MERRA), and the Atmospheric Infrared Sounder (AIRS) by capturing similar magnitudes and patterns of variability in the monthly zonal mean specific humidity and interannual anomaly over annual and interannual timescales. The JPL and UCAR specific humidity climatologies differ by less than 15 % (depending on location and pressure level), primarily due to differences in the retrieved refractivity. In the middle-to-upper troposphere, in all climate zones, JPL is the wettest of all data sets, AIRS is the driest of all data sets, and UCAR, ERA-Interim, and MERRA are in very good agreement, lying between the JPL and AIRS climatologies. In the lower-to-middle troposphere, we present a complex behavior of discrepancies, and we speculate that this might be due to convection and entrainment. Conclusively, the RO observations could potentially be used as a climate variable, but more thorough analysis is required to assess the structural uncertainty between centers and its origin.
Advanced ISDN satellite designs and experiments
NASA Technical Reports Server (NTRS)
Pepin, Gerard R.
1992-01-01
The research performed by GTE Government Systems and the University of Colorado in support of the NASA Satellite Communications Applications Research (SCAR) Program is summarized. Two levels of research were undertaken. The first dealt with providing interim services Integrated Services Digital Network (ISDN) satellite (ISIS) capabilities that accented basic rate ISDN with a ground control similar to that of the Advanced Communications Technology Satellite (ACTS). The ISIS Network Model development represents satellite systems like the ACTS orbiting switch. The ultimate aim is to move these ACTS ground control functions on-board the next generation of ISDN communications satellite to provide full-service ISDN satellite (FSIS) capabilities. The technical and operational parameters for the advanced ISDN communications satellite design are obtainable from the simulation of ISIS and FSIS engineering software models of the major subsystems of the ISDN communications satellite architecture. Discrete event simulation experiments would generate data for analysis against NASA SCAR performance measure and the data obtained from the ISDN satellite terminal adapter hardware (ISTA) experiments, also developed in the program. The Basic and Option 1 phases of the program are also described and include the following: literature search, traffic mode, network model, scenario specifications, performance measures definitions, hardware experiment design, hardware experiment development, simulator design, and simulator development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This volume contains the interim change notice for the safety operation procedure for hot cell. It covers the master-slave manipulators, dry waste removal, cell transfers, hoists, cask handling, liquid waste system, and physical characterization of fluids.
Graiff, Lorenzo; Vigolo, Paolo
2012-04-01
Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to Multiyear Contracts (DFARS Case 2008-D023) AGENCY: Defense Acquisition Regulations System. Department of Defense (DoD). ACTION: Interim rule...
Evaluation of a drainage blanket in an asphalt shoulder section : interim report.
DOT National Transportation Integrated Search
1974-02-01
The aim of this research project was to develop a permeable, yet stable, hot mix asphaltic drainage system for a typical pavement section. Development of such systems should provide the Department with effective means of draining water from highway b...
Petrotac bridge deck waterproofing membrane on Five Mile Creek Bridge : first interim report.
DOT National Transportation Integrated Search
1986-09-01
During the 1970's, the Oregon State Highway Division was involved in a Federally funded experimental program to evaluate various waterproofing membrane systems for bridge decks. Through this program, a list of approved products and/or systems was dev...
Evaluation of thin epoxy system overlays for concrete bridge decks : interim report No. 1.
DOT National Transportation Integrated Search
1986-05-01
Four epoxy overlay systems were applied to concrete bridge decks in north Louisiana to evaluate their performance as skid resistant surfaces primarily and also as concrete sealers. Dural Flexolith, Poly-Carb Flexogrid, and Con/Chem Cono/Crete were pl...
Image guidance improves localization of sonographically occult colorectal liver metastases
NASA Astrophysics Data System (ADS)
Leung, Universe; Simpson, Amber L.; Adams, Lauryn B.; Jarnagin, William R.; Miga, Michael I.; Kingham, T. Peter
2015-03-01
Assessing the therapeutic benefit of surgical navigation systems is a challenging problem in image-guided surgery. The exact clinical indications for patients that may benefit from these systems is not always clear, particularly for abdominal surgery where image-guidance systems have failed to take hold in the same way as orthopedic and neurosurgical applications. We report interim analysis of a prospective clinical trial for localizing small colorectal liver metastases using the Explorer system (Path Finder Technologies, Nashville, TN). Colorectal liver metastases are small lesions that can be difficult to identify with conventional intraoperative ultrasound due to echogeneity changes in the liver as a result of chemotherapy and other preoperative treatments. Interim analysis with eighteen patients shows that 9 of 15 (60%) of these occult lesions could be detected with image guidance. Image guidance changed intraoperative management in 3 (17%) cases. These results suggest that image guidance is a promising tool for localization of small occult liver metastases and that the indications for image-guided surgery are expanding.
76 FR 8992 - National Trails System Act and Railroad Rights-of-Way
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-16
...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION... procedures regarding the use of railroad rights-of-way for railbanking and interim trail use under the National Trails System Act (Trails Act). DATES: Comments are due by April 12, 2011; replies are due by May...
Subscriber Response System; El Segundo Interim Test Report.
ERIC Educational Resources Information Center
Callais, Richard T.
A new cable television system, called the Subscriber Response System (SRS), is being tested prior to a trial installation in El Segundo, California. The components include two bidirectional cables, a computer for processing subscribers' requests, and subscriber terminals to be located in homes or offices. The home terminal includes a three-digit…
12 CFR 630.40 - Contents of the quarterly report to investors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the System Audit Committee. (1) An interim balance sheet as of the end of the most recent fiscal.... 630.40 Section 630.40 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM DISCLOSURE TO INVESTORS IN SYSTEMWIDE AND CONSOLIDATED BANK DEBT OBLIGATIONS OF THE FARM CREDIT SYSTEM Quarterly Reports...
"Winsight"™ Assessment System: Preliminary Theory of Action. Research Report. ETS RR-17-26
ERIC Educational Resources Information Center
Wylie, E. Caroline
2017-01-01
The "Winsight"™Assessment System integrates summative, interim (including both benchmark assessments and testlets), and formative assessment components initially focused on mathematics and English language arts (ELA) in Grades 3-8 and high school.This report provides a preliminary theory of action for the Winsight Assessment System. A…
Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F
2013-05-01
At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.
Publishing interim results of randomised clinical trials in peer-reviewed journals.
Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan
2017-02-01
Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.
Interim Cryogenic Propulsion Stage (ICPS) for EM-1 Transport fro
2017-04-11
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System rocket arrives at the Delta Operations Center at Cape Canaveral Air Force Station in Florida. The ICPS was moved from the United Launch Alliance (ULA) Horizontal Integration Facility near Space Launch Complex 37 at the Cape. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
14 CFR 171.267 - Glide path automatic monitor system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... control points when any of the following occurs: (1) A shift of the mean ISMLS glide path angle equivalent... TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave...
14 CFR 171.267 - Glide path automatic monitor system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... control points when any of the following occurs: (1) A shift of the mean ISMLS glide path angle equivalent... TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave...
14 CFR 171.267 - Glide path automatic monitor system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... control points when any of the following occurs: (1) A shift of the mean ISMLS glide path angle equivalent... TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave...
... U.S. Environmental Protection Agency (EPA) guide titled Mold Remediation in Schools and Commercial Buildings . Also available is ... Resources NIOSH Interim Recommendations for the Cleaning and Remediation of Flood-Contaminated HVAC Systems: A Guide for ...
Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung
2017-01-01
Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pete McGrail
This GDR submission is an interim technical report and raw data files from the first year of testing on functionalized nanoparticles for rare earth element extraction from geothermal fluids. The report contains Rare Earth Element uptake results (percent removal, mg Rare Earth Element/gram of sorbent, distribution coefficient) for the elements of Neodymium, Europium, Yttrium, Dysprosium, and Cesium. A detailed techno economic analysis is also presented in the report for a scaled up geothermal rare earth element extraction process. All rare earth element uptake testing was done on simulated geothermal brines with one rare earth element in each brine. The raremore » earth element uptake testing was conducted at room temperature.« less
Nanomechanics of Actively Controlled Deployable Optics
NASA Technical Reports Server (NTRS)
Peterson, Lee D.
2000-01-01
This document is the interim, annual report for the research grant entitled "Nanomechanics of Actively Controlled Deployed Optics." It is supported by NASA Langley Research Center Cooperative Agreement NCC-1 -281. Dr. Mark S. Lake is the technical monitor of the research program. This document reports activities for the year 1998, beginning 3/11/1998, and for the year 1999. The objective of this report is to summarize the results and the status of this research. This summary appears in Section 2.0. Complete details of the results of this research have been reported in several papers, publications and theses. Section 3.0 lists these publications and, when available, presents their abstracts. Each publication is available in electronic form from a web site identified in Section 3.0.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruno, M.J.
1980-10-01
Pilot reactor VSR-3 operation in the third quarter was directed to tapping molten alloy product. Modifications to the hearth region included a tapping furnace to maintain taphole temperature, a graphite ring filter to separate carbides from matal and an alumina liner to eliminate carbiding from reaction of alloy with the graphite hearth walls. Tapping was not successful, however, due to high alloy viscosity from a large concentration of carbides. Three runs were made on the pilot crystallizer to determine the effects of alloy composition, cooling rate, tamping rate, remelt temperature and rate on eutectic Al-Si yield.
Guidance: Interim Municipal Settlement Policy
Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.
40 CFR 1033.150 - Interim provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... provisions. The provisions of this section apply instead of other provisions of this part for a limited time... remanufacture system. (iv) The remanufacturer must demonstrate at the time of certification that the system... requested such certificates. The notification should occur at the same time that the remanufacturer submits...
40 CFR 1033.150 - Interim provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... provisions. The provisions of this section apply instead of other provisions of this part for a limited time... remanufacture system. (iv) The remanufacturer must demonstrate at the time of certification that the system... requested such certificates. The notification should occur at the same time that the remanufacturer submits...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
Interim Procedures Safeguarding Mobile Devices during International Travel
This procedure is for safeguarding EPA information and systems for all employees, contractors, and other users while on international travel or to specifically designated locations within the United States and foreign embassies.
Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.
Dallas, Michael J
2008-01-01
Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.
Stingl, Katarina; Schippert, Ruth; Bartz-Schmidt, Karl U.; Besch, Dorothea; Cottriall, Charles L.; Edwards, Thomas L.; Gekeler, Florian; Greppmaier, Udo; Kiel, Katja; Koitschev, Assen; Kühlewein, Laura; MacLaren, Robert E.; Ramsden, James D.; Roider, Johann; Rothermel, Albrecht; Sachs, Helmut; Schröder, Greta S.; Tode, Jan; Troelenberg, Nicole; Zrenner, Eberhart
2017-01-01
Purpose: We assessed the safety and efficacy of a technically advanced subretinal electronic implant, RETINA IMPLANT Alpha AMS, in end stage retinal degeneration in an interim analysis of two ongoing prospective clinical trials. The purpose of this article is to describe the interim functional results (efficacy). Methods: The subretinal visual prosthesis RETINA IMPLANT Alpha AMS (Retina Implant AG, Reutlingen, Germany) was implanted in 15 blind patients with hereditary retinal degenerations at four study sites with a follow-up period of 12 months (www.clinicaltrials.gov NCT01024803 and NCT02720640). Functional outcome measures included (1) screen-based standardized 2- or 4-alternative forced-choice (AFC) tests of light perception, light localization, grating detection (basic grating acuity (BaGA) test), and Landolt C-rings; (2) gray level discrimination; (3) performance during activities of daily living (ADL-table tasks). Results: Implant-mediated light perception was observed in 13/15 patients. During the observation period implant mediated localization of visual targets was possible in 13/15 patients. Correct grating detection was achieved for spatial frequencies of 0.1 cpd (cycles per degree) in 4/15; 0.33 cpd in 3/15; 0.66 cpd in 2/15; 1.0 cpd in 2/15 and 3.3 cpd in 1/15 patients. In two patients visual acuity (VA) assessed with Landolt C- rings was 20/546 and 20/1111. Of 6 possible gray levels on average 4.6 ± 0.8 (mean ± SD, n = 10) were discerned. Improvements (power ON vs. OFF) of ADL table tasks were measured in 13/15 patients. Overall, results were stable during the observation period. Serious adverse events (SAEs) were reported in 4 patients: 2 movements of the implant, readjusted in a second surgery; 4 conjunctival erosion/dehiscence, successfully treated; 1 pain event around the coil, successfully treated; 1 partial reduction of silicone oil tamponade leading to distorted vision (silicon oil successfully refilled). The majority of adverse events (AEs) were transient and mostly of mild to moderate intensity. Conclusions: Psychophysical and subjective data show that RETINA IMPLANT Alpha AMS is reliable, well tolerated and can restore limited visual functions in blind patients with degenerations of the outer retina. Compared with the previous implant Alpha IMS, longevity of the new implant Alpha AMS has been considerably improved. Alpha AMS has meanwhile been certified as a commercially available medical device, reimbursed in Germany by the public health system. PMID:28878616
Feasibility Analysis and Prototyping of a Fast Autonomous Recon system
2017-06-01
Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
76 FR 4369 - Special Law Enforcement Commissions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
2009-01-01
Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383
Developing a structural health monitoring system for nuclear dry cask storage canister
NASA Astrophysics Data System (ADS)
Sun, Xiaoyi; Lin, Bin; Bao, Jingjing; Giurgiutiu, Victor; Knight, Travis; Lam, Poh-Sang; Yu, Lingyu
2015-03-01
Interim storage of spent nuclear fuel from reactor sites has gained additional importance and urgency for resolving waste-management-related technical issues. In total, there are over 1482 dry cask storage system (DCSS) in use at US plants, storing 57,807 fuel assemblies. Nondestructive material condition monitoring is in urgent need and must be integrated into the fuel cycle to quantify the "state of health", and more importantly, to guarantee the safe operation of radioactive waste storage systems (RWSS) during their extended usage period. A state-of-the-art nuclear structural health monitoring (N-SHM) system based on in-situ sensing technologies that monitor material degradation and aging for nuclear spent fuel DCSS and similar structures is being developed. The N-SHM technology uses permanently installed low-profile piezoelectric wafer sensors to perform long-term health monitoring by strategically using a combined impedance (EMIS), acoustic emission (AE), and guided ultrasonic wave (GUW) approach, called "multimode sensing", which is conducted by the same network of installed sensors activated in a variety of ways. The system will detect AE events resulting from crack (case for study in this project) and evaluate the damage evolution; when significant AE is detected, the sensor network will switch to the GUW mode to perform damage localization, and quantification as well as probe "hot spots" that are prone to damage for material degradation evaluation using EMIS approach. The N-SHM is expected to eventually provide a systematic methodology for assessing and monitoring nuclear waste storage systems without incurring human radiation exposure.
42 CFR 417.574 - Interim settlement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
10 CFR 590.403 - Emergency interim orders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...
EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.
EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.
49 CFR 37.193 - Interim service requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...
76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...
EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-06
... and Variable Refrigerant Volume (VRV) zoning systems that DACA offers for sale in the North American... of the overall system and to optimize energy efficiency. DACA has designed the VRV III-PB systems to...-conditioning systems: Testing laboratories cannot test products with so many indoor units; and There are too...
Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn
2010-06-01
This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.
An Intelligent CAI Monitor and Generative Tutor. Interim Report.
ERIC Educational Resources Information Center
Koffman, Elliot B.; And Others
Design techniques for generative computer-assisted-instructional (CAI) systems are described in this report. These are systems capable of generating problems for students and of deriving and monitoring solutions; problem difficulty, instructional pace, and depth of monitoring are all individually tailored and parts of the solution algorithms can…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... Housing Assessment System (PHAS): Management Operations Scoring Notice AGENCY: Office of the Assistant... Management Operations interim scoring notice. The document inadvertently omitted a word with respect to the... INFORMATION: I. Background The proposed management operations scoring information was published on August 21...
The United States Environmental Protection Agency Geospatial Quality Council developed this document to harmonize the process of collecting, editing, and exporting spatial data of known quality using the Global Positioning System (GPS). Each organizational entity may adopt this d...
DOT National Transportation Integrated Search
1996-10-01
Certain air traffic control(ATC) centers experienced a series of major outages, : some of which were caused by the Display Channel Complex or DCC-a mainframe : computer system that processes radar and other data into displayable images on : controlle...
77 FR 62596 - Interim Guidance on State Freight Plans and State Freight Advisory Committees
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
...), Maritime Administration (MARAD), Pipeline and Hazardous Materials Safety Administration (PHSMA), Research... Research Program (23 U.S.C. 505). They may also use carryover balances from National Highway System funds... system's users and to the general public (for example, reductions in crashes, fatalities, and injuries...
DOT National Transportation Integrated Search
2007-12-01
This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system (PMS). Results of ...
DOT National Transportation Integrated Search
2001-11-01
This report documents the design of an on-road testbed vehicle. The purposes of this testbed are twofold: (1) Establish a foundation for estimating lane change collision avoidance effectiveness, and (2) provide information pertinent to setting perfor...
Putting Data to Work: Interim Recommendations from The Benchmarking Project
ERIC Educational Resources Information Center
Miles, Marty; Maguire, Sheila; Woodruff-Bolte, Stacy; Clymer, Carol
2010-01-01
As public and private funders have focused on evaluating the effectiveness of workforce development programs, a myriad of data collection systems and reporting processes have taken shape. Navigating these systems takes significant time and energy and often saps frontline providers' capacity to use data internally for program improvement.…
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICARE PROGRAM PROSPECTIVE PAYMENT SYSTEMS FOR... inpatient psychiatric facility receives payment under this subpart for inpatient operating cost and capital-related costs for each inpatient stay following submission of a bill. (b) Periodic interim payments (PIP...
ERIC Educational Resources Information Center
Hawkins, Evelyn K.; And Others
The Evaluation of Worker Profiling and Reemployment Services (WPRS) systems was designed to provide the U.S. Department of Labor information on how states are designing, implementing, and operating their worker profiling and reemployment services systems for dislocated workers and to compare the effectiveness of different state approaches to…
ERIC Educational Resources Information Center
Bornstein, Harry; Casella, Vicki
This interim report describes the development of a networked computerized classroom language management and recording system to assist teachers of children who are deaf or hard-of-hearing. The system will provide storage and access capability for such information as changes in instruction, language learning progress, modifications in communication…
An Information Storage and Retrieval System for Biological and Geological Data. Interim Report.
ERIC Educational Resources Information Center
Squires, Donald F.
A project is being conducted to test the feasibility of an information storage and retrieval system for museum specimen data, particularly for natural history museums. A pilot data processing system has been developed, with the specimen records from the national collections of birds, marine crustaceans, and rocks used as sample data. The research…
DOT National Transportation Integrated Search
1997-01-01
This paper documents the contracting and procurement issues and opportunities encountered by VDOT in developing what was their first public-private partnership agreement for an Intelligent Transportation System (ITS).
Evaluation of full depth asphaltic concrete pavements : interim report.
DOT National Transportation Integrated Search
1975-02-01
This report provides a review of the performance and structural characteristics exhibited on two full depth asphaltic concrete pavement projects constructed on the Louisiana interstate system. : The roughness characteristics of both full depth projec...
Interim Enhanced Surface Water Treatment Rule Documents
The IESWTR balances the need for treatment with potential increases in disinfection by -products. The materials found on this page are intended to assist public water systems and state in the implementation of the IESWTR.
78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...
78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Badin, J.S.; DiPietro, J.P.
The DOE Hydrogen Program is supporting research, development, and demonstration activities to overcome the barriers to the integration of hydrogen into the Nation`s energy infrastructure. Much work is required to gain acceptance of hydrogen energy system concepts and to develop them for implementation. A systems analysis database has been created that includes a formal documentation of technology characterization profiles and cost and performance information. Through a systematic and quantitative approach, system developers can understand and address important issues and thereby assure effective and timely commercial implementation. This project builds upon and expands the previously developed and tested pathway model andmore » provides the basis for a consistent and objective analysis of all hydrogen energy concepts considered by the DOE Hydrogen Program Manager. This project can greatly accelerate the development of a system by minimizing the risk of costly design evolutions, and by stimulating discussions, feedback, and coordination of key players and allows them to assess the analysis, evaluate the trade-offs, and to address any emerging problem areas. Specific analytical studies will result in the validation of the competitive feasibility of the proposed system and identify system development needs. Systems that are investigated include hydrogen bromine electrolysis, municipal solid waste gasification, electro-farming (biomass gasifier and PEM fuel cell), wind/hydrogen hybrid system for remote sites, home electrolysis and alternate infrastructure options, renewable-based electrolysis to fuel PEM fuel cell vehicle fleet, and geothermal energy used to produce hydrogen. These systems are compared to conventional and benchmark technologies. Interim results and findings are presented. Independent analyses emphasize quality, integrity, objectivity, a long-term perspective, corporate memory, and the merging of technical, economic, operational, and programmatic expertise.« less
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...
Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, J.
2002-06-18
The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.
ERIC Educational Resources Information Center
Nugent, Patricia A.
2011-01-01
The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…
Presidential Transition: The Experience of Two Community College Interim Presidents
ERIC Educational Resources Information Center
Thompson, Matthew D.
2010-01-01
The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...
17 CFR 210.10-01 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...
78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...
Staff Reactions to Interim Leadership in a Student Affairs Organization
ERIC Educational Resources Information Center
Jones, Robin D.
2011-01-01
Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…
Faculty and Student Views of the Interim Term
ERIC Educational Resources Information Center
Centra, John A.; Sobol, Marion G.
1974-01-01
Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)
12 CFR 541.18 - Interim Federal savings association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
Into the Sunset: Reflections of an Interim Administrator.
ERIC Educational Resources Information Center
Marlowe, John
2000-01-01
One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)
2015-09-30
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, R.S.; Barnes, E.; Snipes, R.L.
2007-07-01
Russia, stores large quantities of spent nuclear fuel (SNF) from submarine and ice-breaker nuclear powered naval vessels. This high-level radioactive material presents a significant threat to the Arctic and marine environments. Much of the SNF from decommissioned Russian nuclear submarines is stored either onboard the submarines or in floating storage vessels in Northwest and Far East Russia. Some of the SNF is damaged, stored in an unstable condition, or of a type that cannot currently be reprocessed. In many cases, the existing Russian transport infrastructure and reprocessing facilities cannot meet the requirements for moving and reprocessing all of this fuelmore » from remote locations. Additional transport and storage options are required. Some of the existing storage facilities being used in Russia do not meet health and safety and physical security requirements. The U.S. has assisted Russia in the development of a new dual-purpose metal-concrete transport and storage cask (TUK-108/1) for their military SNF and assisted them in building several new facilities for off-loading submarine SNF and storing these TUK-108/1 casks. These efforts have reduced the technical, ecological, and security challenges for removal, handling, interim storage, and shipment of this submarine fuel. Currently, Russian licensing limits the storage period of the TUK-108/1 casks to no more than two years before the fuel must be shipped for reprocessing. In order to extend this licensed storage period, a system is required to condition the casks by removing residual water and creating an inert storage environment by backfilling the internal canisters with a noble gas such as argon. The U.S. has assisted Russia in the development of a mobile cask conditioning system for the TUK-108/1 cask. This new conditioning system allows the TUK 108/1 casks to be stored for up to five years after which the license may be considered for renewal for an additional five years or the fuel will be shipped to 'Mayak' for reprocessing. The U.S. Environmental Protection Agency (EPA), in cooperation with the U.S. DOD Office of Cooperative Threat Reduction (CTR), and the DOE's ORNL, along with the Norwegian Defense Research Establishment, worked closely with the Ministry of Defense and the Ministry of Atomic Energy of the Russian Federation (RF) to develop an improved integrated management system for interim storage of military SNF in Russia. The initial Project activities included: (1) development of a prototype dual-purpose, metal-concrete 40-ton cask for both the transport and interim storage of RF SNF, and (2) development of the first transshipment/interim storage facility for these casks in Murmansk. The U.S. has continued support to the project by assisting the RF with the development of the first mobile system that provides internal conditioning for the TUK-108/1 casks to allow them to be stored for longer than the current licensing period of two years. Development of the prototype TUK-108/1 cask was completed in December 2000 under the Arctic Military Environmental Cooperation (AMEC) Program. This was the first metal-concrete cask developed, licensed, and produced in the RF for both the transportation and storage of SNF from decommissioned submarines. These casks are currently being serially produced in NW Russia and 108 casks have been produced to date. Russia is using these casks for the transport and interim storage of military SNF from decommissioned nuclear submarines at naval installations in the Arctic and Far East in conformance with the Strategic Arms Reduction Treaty (START II). The design, construction, and commissioning of the first transshipment/interim storage facility in the RF was completed and ready for full operation in September 2003. Because of the RF government reorganization and changing regulations for spent fuel storage facilities, the storage facility at Murmansk was not fully licensed for operation until December 2005. The RF has reported that the facility is now fully operational. The TUK-108/1 SNF transport and storage casks were designed to have a 50-year storage life. Current RF practice is not to condition the submarine SNF or cask during the cask loading. Current RF regulations allow up to 4 mm of residual water (up to 3.2 liters) to remain in the casks. It has been determined that allowing this amount of residual water to remain untreated for a period longer than two years can produce hydrogen gas through hydrolysis which will increase the risk of explosion and could cause some corrosion of internal components. A solution to this problem was to develop and utilize a cask conditioning system to remove the residual water and create an inert storage environment in the cask by back-filling the internal cask cavity with an inert gas, such as helium or argon. This system is compatible with the existing TUK-108/1 design and is mobile for use at multiple submarine dismantlement sites. The RF has required that this cask conditioning system be tested and commissioned at the 'Zvezda' Shipyard in the Far East near Vladivostok, one of the major RF submarine fuel off loading and storage facilities. Currently, the fuel cannot be transferred to 'Mayak' for reprocessing until the completion of the 20 km railroad connector between 'Zvezda' and the main rail line to 'Mayak'. The cask conditioning system will allow extension of the currently-stored casks for an additional three years, at which time the rail connector line should be completed. The current license to store these casks at 'Zvezda' was scheduled to expire on 31 Dec 2006. Without the cask-conditioning system, the license could not be extended, no more fuel could be off-loaded from the decommissioned submarines, and the START objectives could not be met at 'Zvezda'. Completion of this cask conditioning system has removed a significant bottleneck for the completion of the Russian submarine decommissioning program under the START II Agreement. (authors)« less
An Experimental Seismic Data and Parameter Exchange System for Interim NEAMTWS
NASA Astrophysics Data System (ADS)
Hanka, W.; Hoffmann, T.; Weber, B.; Heinloo, A.; Hoffmann, M.; Müller-Wrana, T.; Saul, J.
2009-04-01
In 2008 GFZ Potsdam has started to operate its global earthquake monitoring system as an experimental seismic background data centre for the interim NEAMTWS (NE Atlantic and Mediterranean Tsunami Warning System). The SeisComP3 (SC3) software, developed within the GITEWS (German Indian Ocean Tsunami Early Warning System) project was extended to test the export and import of individual processing results within a cluster of SC3 systems. The initiated NEAMTWS SC3 cluster consists presently of the 24/7 seismic services at IMP, IGN, LDG/EMSC and KOERI, whereas INGV and NOA are still pending. The GFZ virtual real-time seismic network (GEOFON Extended Virtual Network - GEVN) was substantially extended by many stations from Western European countries optimizing the station distribution for NEAMTWS purposes. To amend the public seismic network (VEBSN - Virtual European Broadband Seismic Network) some attached centres provided additional private stations for NEAMTWS usage. In parallel to the data collection by Internet the GFZ VSAT hub for the secured data collection of the EuroMED GEOFON and NEAMTWS backbone network stations became operational and the first data links were established. In 2008 the experimental system could already prove its performance since a number of relevant earthquakes have happened in NEAMTWS area. The results are very promising in terms of speed as the automatic alerts (reliable solutions based on a minimum of 25 stations and disseminated by emails and SMS) were issued between 2 1/2 and 4 minutes for Greece and 5 minutes for Iceland. They are also promising in terms of accuracy since epicenter coordinates, depth and magnitude estimates were sufficiently accurate from the very beginning, usually don't differ substantially from the final solutions and provide a good starting point for the operations of the interim NEAMTWS. However, although an automatic seismic system is a good first step, 24/7 manned RTWCs are mandatory for regular manual verification of the automatic seismic results and the estimation of the tsunami potential for a given event.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.
This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Resultsmore » were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.« less
1981-12-10
The Environmental Protection Agency (EPA) is issuing today a Regulation Interpretation Memorandum (RIM) which provides official interpretation of the issue of whether a generator who accumulates hazardous waste pursuant to 40 CFR 262.34, may qualify for interim status after November 19, 1980. This issue arose when the requirements for submitting a Part A permit application (one of the prerequisites to qualifying for interim status) were amended on November 19, 1980. The provisions interpreted today are part of the Consolidated Permit Regulations promulgated under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as amended (RCRA).
2009-06-03
This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).
Interim Cryogenic Propulsion Stage (ICPS) Transport from DOC to
2017-07-26
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket, packed inside a canister, exits the United Launch Alliance (ULA) Delta Operations Center near Space Launch Complex 37 at Cape Canaveral Air Force Station for its move to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) for EM-1 Transport fro
2017-04-11
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System rocket is moved inside the Delta Operations Center at Cape Canaveral Air Force Station in Florida. The ICPS was moved from the United Launch Alliance (ULA) Horizontal Integration Facility near Space Launch Complex 37 at the Cape. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) Prep for Transport fro
2017-07-25
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is packed inside a canister and ready to be moved from the United Launch Alliance (ULA) Delta Operations Center near Space Launch Complex 37 at Cape Canaveral Air Force Station to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) for EM-1 Transport fro
2017-04-11
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket has been moved on its transport stand by truck out of the United Launch Alliance (ULA) Horizontal Integration Facility near Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The ICPS will be transported to the Delta Operations Center. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) for EM-1 Transport fro
2017-04-11
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is moved on its transport stand by truck out of the United Launch Alliance (ULA) Horizontal Integration Facility near Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The ICPS will be transported to the Delta Operations Center. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) for EM-1 Transport fro
2017-04-11
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket has been moved on its transport stand by truck out of the United Launch Alliance (ULA) Horizontal Integration Facility near Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida, on its way to the Delta Operations Center. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) Transport from DOC to
2017-07-26
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket, packed inside a canister, is transported from the United Launch Alliance (ULA) Delta Operations Center near Space Launch Complex 37 at Cape Canaveral Air Force Station along the route to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.
Interim Cryogenic Propulsion Stage (ICPS) for EM-1 Transport fro
2017-04-11
The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket has been moved on its transport stand by truck out of the United Launch Alliance (ULA) Horizontal Integration Facility near Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida, and is on its way to the Delta Operations Center. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission 1.
NASA Astrophysics Data System (ADS)
Byrd, Gene G.; Coleman, Susanna; Werneth, Charles
Our University of Alabama introductory astronomy course has large enrollments, with the usual problems of low attendance and students putting off studying until just before major exams--with predictable consequences. We tried one strategy--cooperatively answering quiz questions--during our May 2002 interim term. Classes were long: three hours a day over three weeks. Before midclass break, we presented a multiple-choice open-book-and-notes quiz to be answered after the break. Quizzes could increase grades without excessively diluting the importance of closed-book major exams. The interim 2002 final exam average was 80%, much better than the 2001 class average of 57%. During a regular semester, handing out and taking up papers would take up much time during the more frequent classes. It's also more interesting if students vote for different answers together, then see the correct answer. We obtained funds for a Classroom Performance System (CPS) consisting of two computer receiver units, a hub, and 128 TV remote-style response pads. We used the CPS during interim 2003. Ease of giving quizzes and grading permitted two shorter quizzes a day. Improvement was maintained, with a slight 3% increase. In addition, students graded the "cooperative quiz" 2002 and 2003 courses higher than the 2001 course. We also used the CPS for public astronomy events and introductory physics courses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 1804.470-2 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL...) 2810, Security of Information Technology; NASA Procedural Requirements (NPR) 2810, Security of Information Technology; and interim policy updates in the form of NASA Information Technology Requirements...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 1804.470-2 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL...) 2810, Security of Information Technology; NASA Procedural Requirements (NPR) 2810, Security of Information Technology; and interim policy updates in the form of NASA Information Technology Requirements...
NAVSTAR GPS Simulation and Analysis Program (Interim Report)
DOT National Transportation Integrated Search
1983-10-01
This study assesses the capability of the planned NAVSTAR Global Positioning System (GPS) to meet civil navigation requirements. When it becomes operational in about 1983, NAVSTAR GPS will provide accurate two-dimensional and three-dimensional servic...
Louisiana experimental base project : interim report No. 1.
DOT National Transportation Integrated Search
1979-11-01
The Louisiana Experimental Base Project is a research study evaluating the design/performance characteristics of three types of base courses as incorporated into comparable flexible pavement systems on a full-scale test road. Fourteen different test ...
SWTR Fact Sheet - EPA Region 8, May 2018
Contains information for public water systems under the Surface Water Treatment Rule (SWTR), Filter Backwash Recycling Rule, Interim Enhanced SWTR (IESWTR), Long Term 1 Enhanced SWTR (LT1ESWTR) and Long Term 2 Enhanced SWTR (LT2).
Full depth reclamation with cement, fourth interim, December 2009.
DOT National Transportation Integrated Search
2009-12-01
Due to the rising cost of virgin aggregate and asphalt products the Maine Department of Transportation : (MaineDOT) utilizes a number of reconstruction and rehabilitation processes to cost effectively maintain : Maines highway system. One rehabili...
SWTR Fact Sheet - EPA Region 8, July 2016
Contains information for public water systems under the Surface Water Treatment Rule (SWTR), Filter Backwash Recycling Rule, Interim Enhanced SWTR (IESWTR), Long Term 1 Enhanced SWTR (LT1ESWTR) and Long Term 2 Enhanced SWTR (LT2).
Health Resources Priority and Allocations System (HRPAS). Interim final rule.
2015-07-17
This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...
Do Interim Assessments Reduce the Race and SES Achievement Gaps?
ERIC Educational Resources Information Center
Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie
2017-01-01
The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-06
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...
Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...
42 CFR 417.572 - Budget and enrollment forecast and interim reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
...: Comments should be addressed to Interim Director, Division of Human Resource Management and Chief Human.... Judith S. Sunley, Interim Director, Division of Human Resource Management and Chief Human Capital Officer..., Interim Director, Division of Human Resource Management and Chief Human Capital Officer. [FR Doc. 2010...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
NASA Technical Reports Server (NTRS)
1994-01-01
Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.
Mathematical Techniques for Nonlinear System Theory.
1978-01-01
4. TITLE (and Subtitle) 5. TYPE OF REPORT 6 PERIOD COVERED MATHEMATICAL TECHNIQUES FOR NONLINEAR SYSTEM THEORY Interim 6...ADDRESS 10. PROGRAM ELEMENT. PROJECT . TASK AREA & WORK UNIT NUMBERS Unlvers].ty of Flori.da Center for Mathematical System Theory ~~~~ Gainesville , FL...rings”, Mathematical System Theory , 9: 327—344. E. D. SONTAG (1976b1 “Linear systems over commutative rings: a survey”, Richerche di Automatica, 7: 1-34
DOT National Transportation Integrated Search
2001-03-27
The Global Positioning System (GPS) is significant because it is a key element in the development of the Free Flight" air traffic management structure of the future which is needed to enable the expected growth of air travel and alleviate the current...
An Automated Cloud Observation System (ACOS).
1980-12-17
IQ 4. TITLE (and SubliIII.J 5- TYPE OF REPORT & PERIOD COVERED AN.JUTOXMATrD A LOUD OBSERVATION Scientific . Interim. SYSTEM (ALLIS) 6 PERFORMING ORG...p oci -dIi IV ( ( )S). . hhe 6 lists the percentage of agreement realizied by -:~ tc thc fiftt en metthods (I’ p touping ceilomieter t’ ata (see Ta
Automation Challenges of the 80's: What to Do until Your Integrated Library System Arrives.
ERIC Educational Resources Information Center
Allan, Ferne C.; Shields, Joyce M.
1986-01-01
A medium-sized aerospace library has developed interim solutions to automation needs by using software and equipment that were available in-house in preparation for an expected integrated library system. Automated processes include authors' file of items authored by employees, journal routing (including routing slips), statistics, journal…
International Standards. U.S. Metric Study Report.
ERIC Educational Resources Information Center
Huntoon, Robert D.; And Others
In this first interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, a series of conclusions and recommendations, based upon a national survey of the role of SI (System's International) units in international trade and other areas of foreign relations, includes the following…
75 FR 42575 - Electronic Signature and Storage of Form I-9, Employment Eligibility Verification
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-22
... Electronic Signature and Storage of Form I-9, Employment Eligibility Verification AGENCY: U.S. Immigration... published an interim final rule to permit electronic signature and storage of the Form I-9. 71 FR 34510..., or a combination of paper and electronic systems; Employers may change electronic storage systems as...
DOT National Transportation Integrated Search
1997-05-01
This report represents the documentation of the design of the testbed. The purposes of the testbed are twofold 1) Establish a foundation for estimating collision avoidance effectiveness and 2) Provide information pertinent to setting performance spec...