Sample records for taitekerroinmittaustekniikan kehittaeminen teollisuuden

  1. Compensation as Means for Local Acceptance The Case of the Final Disposal of Spent Nuclear Fuel in Eurajoki, Finland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kojo, M.

    The paper sheds light on the local negotiations on compensation as a part of the site selection for the spent nuclear fuel repository in Finland. The negotiation took place between the representatives of the Municipality of Eurajoki, the nuclear power company Teollisuuden Voima Ltd (TVO) and the nuclear waste management company Posiva Ltd in the late 1990's. The compensation negotiation process and the development of the requirements are elucidated in detail on the basis of the analysis of the minutes of the meetings of the Vuojoki working party. The paper helps to understand the smooth site selection process in Finland.more » The context of the local decision-making is viewed from the policy, institutional and economic aspect. It is concluded in the paper that when trying to understand the progress of the Finnish site selection process more emphasis should be put on the role of TVO, the economic dependency of the Municipality of Eurajoki on TVO and the partnership between TVO and the leading local politicians. (authors)« less

  2. Local negotiation on compensation siting of the spent nuclear fuel repository in Finland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kojo, Matti

    The aim of the paper is to analyse the local negotiation process between the Municipality of Eurajoki and the nuclear power company Teollisuuden Voima (TVO) and the nuclear waste management company Posiva Oy. The aim of the negotiations was to find an acceptable form of compensation for siting a spent nuclear fuel repository in Olkiluoto, Finland. The paper includes background information on the siting process in Finland, the local political setting in the Municipality of Eurajoki and a description of the negotiation process. The analysis of the negotiations on compensation is important for better understanding the progress of the Finnishmore » siting process. The paper describes the picture of the contest to host the spent nuclear fuel repository. It also provides more information on the relationship between the Municipality of Eurajoki and the power company TVO. The negotiations on compensation and the roles of various players in the negotiations have not been studied in detail because the minutes of the Vuojoki liaison group were not available before the decision of the Supreme Administrative Court in May 2006. (author)« less

  3. Risk-informed regulation and safety management of nuclear power plants--on the prevention of severe accidents.

    PubMed

    Himanen, Risto; Julin, Ari; Jänkälä, Kalle; Holmberg, Jan-Erik; Virolainen, Reino

    2012-11-01

    There are four operating nuclear power plant (NPP) units in Finland. The Teollisuuden Voima (TVO) power company has two 840 MWe BWR units supplied by Asea-Atom at the Olkiluoto site. The Fortum corporation (formerly IVO) has two 500 MWe VVER 440/213 units at the Loviisa site. In addition, a 1600 MWe European Pressurized Water Reactor supplied by AREVA NP (formerly the Framatome ANP--Siemens AG Consortium) is under construction at the Olkiluoto site. Recently, the Finnish Parliament ratified the government Decision in Principle that the utilities' applications to build two new NPP units are in line with the total good of the society. The Finnish utilities, Fenno power company, and TVO company are in progress of qualifying the type of the new nuclear builds. In Finland, risk-informed applications are formally integrated in the regulatory process of NPPs that are already in the early design phase and these are to run through the construction and operation phases all through the entire plant service time. A plant-specific full-scope probabilistic risk assessment (PRA) is required for each NPP. PRAs shall cover internal events, area events (fires, floods), and external events such as harsh weather conditions and seismic events in all operating modes. Special attention is devoted to the use of various risk-informed PRA applications in the licensing of Olkiluoto 3 NPP. © 2012 Society for Risk Analysis.

  4. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kosonen, M.; Hakola, M.

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to themore » program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps