Sample records for tank closure progress

  1. Tank Closure Progress at the Department of Energy's Idaho National Engineering Laboratory Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lockie, K.A.; Suttora, L.C.; Quigley, K.D.

    2007-07-01

    Significant progress has been made at the U.S. Department of Energy (DOE) Idaho National Laboratory (INL) to clean and close emptied radioactive liquid waste storage tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF). The TFF includes eleven 1,135.6-kL (300,000-gal) underground stainless steel storage tanks and four smaller, 113.5-kL (30,000-gal) stainless steel tanks, along with tank vaults, interconnecting piping, and ancillary equipment. The TFF tanks have historically been used to store a variety of radioactive liquid waste, including wastes associated with past spent nuclear fuel reprocessing. Although four of the large storage tanks remain inmore » use for waste storage, the other seven 1,135.6-kL (300,000-gal) tanks and the four 113.5-kL (30,000-gal) tanks have been emptied of waste and cleaned in preparation of final closure. A water spray cleaning system was developed and deployed to clean internal tank surfaces and remove remaining tank wastes. The cleaning system was effective in removing all but a very small volume of solid residual waste particles. Recent issuance of an Amended Record of Decision (ROD) in accordance with the National Environmental Policy Act, and a Waste Determination complying with Section 3116 of the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005, has allowed commencement of grouting activities on the cleaned tanks. In November 2006, three of the 113.5-kL (30,000-gal) tanks were filled with grout to provide long-term stability. It is currently planned that all seven cleaned 1,135.6-kL (300,000-gal) tanks, as well as the four 113.5-kL (30,000-gal) tanks and all associated tank vaults and interconnecting piping, will be stabilized with grout as early as 2008. (authors)« less

  2. Citizen Contributions to the Closure of High-Level Waste (HLW) Tanks 18 and 19 at the Department of Energy's (DOE) Savannah River Site (SRS) - 13448

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawless, W.F.

    2013-07-01

    Citizen involvement in DOE's decision-making for the environmental cleanup from DOE's management of its nuclear wastes across the DOE complex has had a positive effect on the cleanup of its SRS site, characterized by an acceleration of cleanup not only for the Transuranic wastes at SRS, but also for DOE's first two closures of HLW tanks, both of which occurred at SRS. The Citizens around SRS had pushed successfully for the closures of Tanks 17 and 20 in 1997, becoming the first closures of HLW tanks under regulatory guidance in the USA. However, since then, HLW tank closures ceased duemore » to a lawsuit, the application of new tank clean-up technology, interagency squabbling between DOE and NRC over tank closure criteria, and finally and almost fatally, from budget pressures. Despite an agreement with its regulators for the closure of Tanks 18 and 19 by the end of calendar year 2012, the outlook in Fall 2011 to close these two tanks had dimmed. It was at this point that the citizens around SRS became reengaged with tank closures, helping DOE to reach its agreed upon milestone. (authors)« less

  3. Commercial Submersible Mixing Pump For SRS Tank Waste Removal - 15223

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hubbard, Mike; Herbert, James E.; Scheele, Patrick W.

    The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m 3 to 4921 m 3 (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removalmore » and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112KW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224KW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224KW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of “off-the-shelf” industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP.« less

  4. ICPP tank farm closure study. Volume 2: Engineering design files

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-02-01

    Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-groutedmore » polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks.« less

  5. Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerry L. Nisson

    2012-10-01

    This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

  6. Environmental Assessment for the Closure of the High-Level Waste Tanks in F- & H-Areas at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1996-07-31

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authoritymore » of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40 CFR 300.430(e)(9): ( 1) overall protection of human health and the environment; (2) compliance with applicable or relevant and appropriated requirement: (ARARs); (3) long-term effectiveness and permanence; (4) reduction of toxicity, mobility, or volume through treatment; (5) short-term effectiveness; (6) implementability; (7) cost; (8) state acceptable; and (9) community acceptance. Closure of each tank involves two separate operations after bulk waste removal has been accomplished: (1) cleaning of the tank (i.e., removing the residual contaminants), and (2) the actual closure or filling of the tank with an inert material, (e.g., grout). This process would continue until all the tanks and ancillary equipment and systems have been closed. This is expected to be about year 2028 for Type I, II, and IV tanks and associated systems. Subsequent to that, Type III tanks and systems will be closed.« less

  7. 49 CFR 179.100-17 - Closures for openings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-17 Closures for...

  8. 49 CFR 179.100-17 - Closures for openings.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-17 Closures for...

  9. 49 CFR 179.100-17 - Closures for openings.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-17 Closures for...

  10. 49 CFR 179.220-22 - Closure for openings.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-22 Closure for openings...

  11. 49 CFR 179.200-21 - Closures for openings.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-21 Closures for openings...

  12. 49 CFR 179.220-22 - Closure for openings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-22 Closure for openings...

  13. 49 CFR 179.200-21 - Closures for openings.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-21 Closures for openings...

  14. 49 CFR 179.200-15 - Closures for manways.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-15 Closures for manways...

  15. 49 CFR 179.200-21 - Closures for openings.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-21 Closures for openings...

  16. 49 CFR 179.200-15 - Closures for manways.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-15 Closures for manways...

  17. 49 CFR 179.200-15 - Closures for manways.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-15 Closures for manways...

  18. EXTRACTION APPARATUS

    DOEpatents

    Ballard, A.E.; Brigham, H.R.

    1958-10-28

    An apparatus whereby relatlvely volatile solvents may be contacted with volatile or non-volatile material without certaln attendant hazards is described. A suitable apparatus for handling relatively volatlle liqulds may be constructed comprising a tank, and a closure covering the tank and adapted to be securely attached to an external suppont. The closure is provided with a rigidly mounted motor-driven agitator. This agitator is connected from the driving motor lnto the lnterlor of the tank through a gland adapted to be cooled witb inert gas thereby eliminating possible hazard due to frictional heat. The closure is arranged so that the tank may be removed from it without materially dlsturbing the closure which, as described, carrles the motor driven agitator and other parts.

  19. Closure Report for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    CAU 127, Areas 25 and 26 Storage Tanks, consists of twelve CASs located in Areas 25 and 26 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this Closure Report is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  20. Communicating Performance Assessments Results - 13609

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Layton, Mark

    2013-07-01

    The F-Area Tank Farms (FTF) and H-Area Tank Farm (HTF) are owned by the U.S. Department of Energy (DOE) and operated by Savannah River Remediation LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF and HTF are active radioactive waste storage and treatment facilities consisting of 51 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. Performance Assessments (PAs) for each Tank Farm have been prepared to support the eventual closure of the underground radioactive waste tanks and ancillary equipment. PAs provide the technical bases and results to bemore » used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of the Tank Farms. The Tank Farms are subject to a number of regulatory requirements. The State regulates Tank Farm operations through an industrial waste water permit and through a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Closure documentation will include State-approved Tank Farm Closure Plans and tank-specific closure modules utilizing information from the PAs. For this reason, the State of South Carolina and the EPA must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. PAs are performance-based, risk-informed analyses of the fate and transport of FTF and HTF residual wastes following final closure of the Tank Farms. Since the PAs serve as the primary risk assessment tools in evaluating readiness for closure, it is vital that PA conclusions be communicated effectively. In the course of developing the FTF and HTF PAs, several lessons learned have emerged regarding communicating PA results. When communicating PA results it is important to stress that the primary goal of the PA results is to provide risk understanding, recognizing the magnitude of risk and identifying the conceptual model decisions and critical assumptions that most impact the results. Conceptual models that describe reality using simplified, mathematical approaches, and their roles in arriving at the PA results, must also be communicated. When presenting PA results, evaluations will typically be focused on a single baseline (or Base Case) to provide a foundation for discussion. The PA results are supplemented by other studies (alternate configurations, uncertainty analyses, and sensitivity analyses) which provide a breadth of modeling to supplement the Base Case. The suite of information offered by the various modeling cases and studies provides confidence that the overall risk is understood along with the underlying parameters and conditions that contribute to risk. (author)« less

  1. The Integration of the 241-Z Building Decontamination and Decommissioning Under Cercla with RCRA Closure at the Plutonium Finishing Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattlin, E.; Charboneau, S.; Johnston, G.

    2007-07-01

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less

  2. 40 CFR 280.71 - Permanent closure and changes-in-service.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.71 Permanent closure and changes... sludges. All tanks taken out of service permanently must also be either removed from the ground or filled with an inert solid material. (c) Continued use of an UST system to store a non-regulated substance is...

  3. 40 CFR 280.71 - Permanent closure and changes-in-service.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.71 Permanent closure and changes... sludges. All tanks taken out of service permanently must also be either removed from the ground or filled with an inert solid material. (c) Continued use of an UST system to store a non-regulated substance is...

  4. 40 CFR 280.71 - Permanent closure and changes-in-service.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.71 Permanent closure and changes... sludges. All tanks taken out of service permanently must also be either removed from the ground or filled with an inert solid material. (c) Continued use of an UST system to store a non-regulated substance is...

  5. 40 CFR 280.71 - Permanent closure and changes-in-service.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.71 Permanent closure and changes... sludges. All tanks taken out of service permanently must also be either removed from the ground or filled with an inert solid material. (c) Continued use of an UST system to store a non-regulated substance is...

  6. 49 CFR 178.338-11 - Discharge control devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... water capacity, remote means of automatic closure must be installed at the ends of the cargo tank in at... control system. (ii) On a cargo tank motor vehicle of 3,500 gallons water capacity or less, at least one remote means of automatic closure must be installed on the end of the cargo tank farthest away from the...

  7. 78 FR 75913 - Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... Subtitle C barrier, a multi-layer barrier designed to provide 500-year protection. \\2\\ Under Tank Closure..., which means the tanks, ancillary equipment, and contaminated soil would be removed, and the remaining... Hanford barrier, a multi- layer barrier designed to provide 1,000-year protection. Alternative 6: All...

  8. Thermodynamic model for uranium release from hanford site tank residual waste.

    PubMed

    Cantrell, Kirk J; Deutsch, William J; Lindberg, Mike J

    2011-02-15

    A thermodynamic model of U solid-phase solubility and paragenesis was developed for Hanford Site tank residual waste that will remain in place after tank closure. The model was developed using a combination of waste composition data, waste leach test data, and thermodynamic modeling of the leach test data. The testing and analyses were conducted using actual Hanford Site tank residual waste. Positive identification of U phases by X-ray diffraction was generally not possible either because solids in the waste were amorphous or their concentrations were not detectable by XRD for both as-received and leached residual waste. Three leachant solutions were used in the studies: deionized water, CaCO3 saturated solution, and Ca(OH)2 saturated solution. Analysis of calculated saturation indices indicate that NaUO2PO4·xH2O and Na2U2O7(am) are present in the residual wastes initially. Leaching of the residual wastes with deionized water or CaCO3 saturated solution results in preferential dissolution Na2U2O7(am) and formation of schoepite. Leaching of the residual wastes with Ca(OH)2 saturated solution appears to result in transformation of both NaUO2PO4·xH2O and Na2U2O7(am) to CaUO4. Upon the basis of these results, the paragenetic sequence of secondary phases expected to occur as leaching of residual waste progresses for two tank closure scenarios was identified.

  9. Tank Closure Progress at the Department of Energy's Idaho National Engineering Laboratory Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Quigley, K.D.; Butterworth, St.W.; Lockie, K.A.

    2008-07-01

    Significant progress has been made at the U.S. Department of Energy (DOE) Idaho National Laboratory (INL) to empty, clean and close radioactive liquid waste storage tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF). The TFF includes eleven 1,135.6-kL (300,000-gal) underground stainless steel storage tanks and four smaller, 113.5-kL (30,000-gal) stainless steel tanks, along with tank vaults, interconnecting piping, and ancillary equipment. The TFF tanks have historically been used to store a variety of radioactive liquid waste, including wastes associated with past spent nuclear fuel reprocessing. Although four of the large storage tanks remain inmore » use for waste storage, the other seven 1,135.6-kL (300,000-gal) tanks and the four 113.5-kL (30,000-gal) tanks have been emptied of waste, cleaned and filled with grout. A water spray cleaning system was developed and deployed to clean internal tank surfaces and remove remaining tank wastes. The cleaning system was effective in removing all but a very small volume of solid residual waste particles. Recent issuance of an Amended Record of Decision (ROD) in accordance with the National Environmental Policy Act, and a Waste Determination complying with Section 3116 of the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005, has allowed commencement of grouting activities on the cleaned tanks. The first three 113.5-kL (30,000-gal) tanks were grouted in the Fall of 2006 and the fourth tank and the seven 1,135.6-kL (300,000-gal) tanks were filled with grout in 2007 to provide long-term stability. It is currently planned that associated tank valve boxes and interconnecting piping, will be stabilized with grout as early as 2008. (authors)« less

  10. CEMENTITIOUS GROUT FOR CLOSING SRS HIGH LEVEL WASTE TANKS - #12315

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Langton, C.; Burns, H.; Stefanko, D.

    2012-01-10

    In 1997, the first two United States Department of Energy (US DOE) high level waste tanks (Tanks 17-F and 20-F: Type IV, single shell tanks) were taken out of service (permanently closed) at the Savannah River Site (SRS). In 2012, the DOE plans to remove from service two additional Savannah River Site (SRS) Type IV high-level waste tanks, Tanks 18-F and 19-F. These tanks were constructed in the late 1950's and received low-heat waste and do not contain cooling coils. Operational closure of Tanks 18-F and 19-F is intended to be consistent with the applicable requirements of the Resource Conservationmore » and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and will be performed in accordance with South Carolina Department of Health and Environmental Control (SCDHEC). The closure will physically stabilize two 4.92E+04 cubic meter (1.3 E+06 gallon) carbon steel tanks and isolate and stabilize any residual contaminants left in the tanks. The closure will also fill, physically stabilize and isolate ancillary equipment abandoned in the tanks. A Performance Assessment (PA) has been developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closure of the F-Area Tank Farm (FTF) waste tanks. Next generation flowable, zero-bleed cementitious grouts were designed, tested, and specified for closing Tanks 18-F and 19-F and for filling the abandoned equipment. Fill requirements were developed for both the tank and equipment grouts. All grout formulations were required to be alkaline with a pH of 12.4 and chemically reduction potential (Eh) of -200 to -400 to stabilize selected potential contaminants of concern. This was achieved by including Portland cement and Grade 100 slag in the mixes, respectively. Ingredients and proportions of cementitious reagents were selected and adjusted, respectively, to support the mass placement strategy developed by closure operations. Subsequent down selection was based on compressive strength and saturated hydraulic conductivity results. Fresh slurry property results were used as the first level of screening. A high range water reducing admixture and a viscosity modifying admixture were used to adjust slurry properties to achieve flowable grouts. Adiabatic calorimeter results were used as the second level screening. The third level of screening was used to design mixes that were consistent with the fill material parameters used in the F-Tank Farm Performance Assessment which was developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closures.« less

  11. F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Layton, Mark H.

    2012-07-01

    The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA providesmore » the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)« less

  12. Ecological Data in Support of the Tank Closure and Waste Management Environmental Impact Statement. Part 2: Results of Spring 2007 Field Surveys

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sackschewsky, Michael R.; Downs, Janelle L.

    2007-05-31

    This review provides an evaluation of potential impacts of actions that have been proposed under various alternatives to support the closure of the high level waste tanks on the Hanford Site. This review provides a summary of data collected in the field during the spring of 2007 at all of the proposed project sites within 200 East and 200 West Areas, and at sites not previously surveyed. The primary purpose of this review is to provide biological data that can be incorporated into or used to support the Tank Closure and Waste Management Environmental Impact Statement.

  13. NUCLEAR CLEANUP: Progress Made at Rocky Flats, but Closure by 2006 Is Unlikely, and Costs May Increase

    DTIC Science & Technology

    2001-02-01

    liquids or residues from process pipes and tanks. The contractor also dismantled plutonium - processing furnaces, stripped out contaminated process...Soil Cleanup Levels on the Scope and Cost of the 903 Pad Cleanup 30 Figures Figure 1: Workers in Protective Clothing Handling Plutonium - Contaminated ...activities—shipping nuclear materials such as plutonium - contaminated metals and powders—is expected to be completed in 2002. Another activity

  14. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  15. Development and Testing of a Mobile Platform for Tank Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nance, T.A.

    2001-01-16

    The Department of Energy (DOE) is committed to removing millions of gallons of high level radioactive waste from waste storage tanks at the Savannah River Site (SRS). SRS was the first site in the DOE complex to have emptied and closed high level waste tanks. Tank closure at the Site is now progressing to tanks containing waste composed of liquid and large deposits of solids, including a tank that has a potential ''heel''. A heel is a hardened mass of solid waste material spread across the tank bottom. Tank closure requires breaking up this heel and moving the material tomore » the intake of a pumping system for transfer from the tank. In the past, overhead spray systems have been used with some success at moving waste. But the limited number of risers restricts the coverage area of the overhead spray system. Therefore, a floor- level spray system will be used to separate manageable size chunks of the material from the heel. The chunks will be guided into the pump's intake to be remove from the tank. The floor-level spray system movement will be accomplished by using a mobile platform, a crawler, which provides transport to nearly every point on the tank floor. Transport of the spray system will allow the system to ''corral'' the waste away from the tank walls and control the movement of the material across the tank floor. Because the available access riser is small, and a wide crawler platform is required to support the spray system, the crawler's frame must fold to enter the tank. After entry into the tank, the crawler unfolds on the tank floor using the crawler drive tracks to expand the frame and position the mobile platform under the entry riser. The spray system will then be lowered separately through the entry riser and mated onto the crawler on the tank floor. The crawler and spray system are tethered and controlled remotely by personnel at the control station. Motorized cable reels will also be remotely controlled to pay out, retrieve, and manage the tethers as the mobile platform moves the spray system across the tank floor. Both the crawler and spray systems are designed to be retrievable. Development of the tank cleaning system was evaluated using a performance test program. The tests evaluated the spray system dynamics, the crawler's fit through the riser, the crawler landing in mocked up tank with simulant, the crawler's traction, and the crawler and spray system mating. Initial testing verified the crawler platform was compatible with the dynamics produced by the spray system. The riser fit test confirmed that a dedicated riser is required for deployment of the crawler and the spray system. The crawler traction test defined the capabilities of the crawler at different levels of simulant. Deployment testing through a mockup riser verified the basic system processes. Finally, testing of the complete system in a full-scale mockup with sludge simulant was performed to evaluate the tank cleaning ability of the crawler. This paper describes th e tank conditions, the tank closure process, the development of the crawler and spray system, and the testing program and results used to evaluate the mobile platform and spray system.« less

  16. Summary of Group Development and Testing for Single Shell Tank Closure at Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harbour, John, R.

    2005-04-28

    This report is a summary of the bench-scale and large scale experimental studies performed by Savannah River National Laboratory for CH2M HILL to develop grout design mixes for possible use in producing fill materials as a part of Tank Closure of the Single-Shell Tanks at Hanford. The grout development data provided in this report demonstrates that these design mixes will produce fill materials that are ready for use in Hanford single shell tank closure. The purpose of this report is to assess the ability of the proposed grout specifications to meet the current requirements for successful single shell tank closuremore » which will include the contracting of services for construction and operation of a grout batch plant. The research and field experience gained by SRNL in the closure of Tanks 17F and 20F at the Savannah River Site was leveraged into the grout development efforts for Hanford. It is concluded that the three Hanford grout design mixes provide fill materials that meet the current requirements for successful placement. This conclusion is based on the completion of recommended testing using Hanford area materials by the operators of the grout batch plant. This report summarizes the regulatory drivers and the requirements for grout mixes as tank fill material. It is these requirements for both fresh and cured grout properties that drove the development of the grout formulations for the stabilization, structural and capping layers.« less

  17. 49 CFR 178.337-6 - Closure for manhole.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-6 Closure for manhole. (a) Each cargo tank marked or...), except that a cargo tank constructed of NQT steel having a capacity of 3,500 water gallons or less may be provided with an inspection opening conforming to paragraph UG-46 and other applicable requirements of the...

  18. 49 CFR 178.337-6 - Closure for manhole.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-6 Closure for manhole. (a) Each cargo tank marked or...), except that a cargo tank constructed of NQT steel having a capacity of 3,500 water gallons or less may be provided with an inspection opening conforming to paragraph UG-46 and other applicable requirements of the...

  19. 49 CFR 178.337-6 - Closure for manhole.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-6 Closure for manhole. (a) Each cargo tank marked or...), except that a cargo tank constructed of NQT steel having a capacity of 3,500 water gallons or less may be provided with an inspection opening conforming to paragraph UG-46 and other applicable requirements of the...

  20. 49 CFR 178.337-6 - Closure for manhole.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-6 Closure for manhole. (a) Each cargo tank marked or...), except that a cargo tank constructed of NQT steel having a capacity of 3,500 water gallons or less may be provided with an inspection opening conforming to paragraph UG-46 and other applicable requirements of the...

  1. Annual Report, Fall 2016: Identifying Cost Effective Tank Waste Characterization Approaches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reboul, S. H.; DiPrete, D. P.

    2016-12-12

    This report documents the activities that were performed during the second year of a project undertaken to improve the cost effectiveness and timeliness of SRNL’s tank closure characterization practices. The activities performed during the first year of the project were previously reported in SRNL-STI-2015-00144. The scope of the second year activities was divided into the following three primary tasks: 1) develop a technical basis and strategy for improving the cost effectiveness and schedule of SRNL’s tank closure characterization program; 2) initiate the design and assembly of a new waste removal system for improving the throughput and reducing the personnel dosemore » associated with extraction chromatography radiochemical separations; and 3) develop and perform feasibility testing of three alternative radiochemical separation protocols holding promise for improving high resource demand/time consuming tank closure sample analysis methods.« less

  2. 49 CFR 179.100-17 - Closures for openings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100...

  3. 49 CFR 179.200-21 - Closures for openings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-21...

  4. 49 CFR 179.200-15 - Closures for manways.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-15...

  5. ICPP tank farm closure study. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spaulding, B.C.; Gavalya, R.A.; Dahlmeir, M.M.

    1998-02-01

    The disposition of INEEL radioactive wastes is now under a Settlement Agreement between the DOE and the State of Idaho. The Settlement Agreement requires that existing liquid sodium bearing waste (SBW), and other liquid waste inventories be treated by December 31, 2012. This agreement also requires that all HLW, including calcined waste, be disposed or made road ready to ship from the INEEL by 2035. Sodium bearing waste (SBW) is produced from decontamination operations and HLW from reprocessing of SNF. SBW and HLW are radioactive and hazardous mixed waste; the radioactive constituents are regulated by DOE and the hazardous constituentsmore » are regulated by the Resource Conservation and Recovery Act (RCRA). Calcined waste, a dry granular material, is produced in the New Waste Calcining Facility (NWCF). Two primary waste tank storage locations exist at the ICPP: Tank Farm Facility (TFF) and the Calcined Solids Storage Facility (CSSF). The TFF has the following underground storage tanks: four 18,400-gallon tanks (WM 100-102, WL 101); four 30,000-gallon tanks (WM 103-106); and eleven 300,000+ gallon tanks. This includes nine 300,000-gallon tanks (WM 182-190) and two 318,000 gallon tanks (WM 180-181). This study analyzes the closure and subsequent use of the eleven 300,000+ gallon tanks. The 18,400 and 30,000-gallon tanks were not included in the work scope and will be closed as a separate activity. This study was conducted to support the HLW Environmental Impact Statement (EIS) waste separations options and addresses closure of the 300,000-gallon liquid waste storage tanks and subsequent tank void uses. A figure provides a diagram estimating how the TFF could be used as part of the separations options. Other possible TFF uses are also discussed in this study.« less

  6. TANK FARM CLOSURE - A NEW TWIST ON REGULATORY STRATEGIES FOR CLOSURE OF WASTE TANK RESIDUALS FOLLOWING NUREG

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LEHMAN LL

    2008-01-23

    Waste from a number of single-shell tanks (SST) at the U.S. Department of Energy's (DOE) Hanford Site has been retrieved by CH2M HILL Hanford Group to fulfill the requirements of the 'Hanford Federal Facility Agreement and Consent Order (HFFACO) [1]. Laboratory analyses of the Hanford tank residual wastes have provided concentration data which will be used to determine waste classification and disposal options for tank residuals. The closure of tank farm facilities remains one of the most challenging activities faced by the DOE. This is due in part to the complicated regulatory structures that have developed. These regulatory structures aremore » different at each of the DOE sites, making it difficult to apply lessons learned from one site to the next. During the past two years with the passage of the Section 3116 of the 'Ronald Reagan Defense Authorization Act of 2005' (NDAA) [2] some standardization has emerged for Savannah River Site and the Idaho National Laboratory tank residuals. Recently, with the issuance of 'NRC Staff Guidance for Activities Related to US. Department of Energy Waste Determinations' (NUREG-1854) [3] more explicit options may be considered for Hanford tank residuals than are presently available under DOE Orders. NUREG-1854, issued in August 2007, contains several key pieces of information that if utilized by the DOE in the tank closure process, could simplify waste classification and streamline the NRC review process by providing information to the NRC in their preferred format. Other provisions of this NUREG allow different methods to be applied in determining when waste retrieval is complete by incorporating actual project costs and health risks into the calculation of 'technically and economically practical'. Additionally, the NUREG requires a strong understanding of the uncertainties of the analyses, which given the desire of some NRC/DOE staff may increase the likelihood of using probabilistic approaches to uncertainty analysis. The purpose of this paper is to discuss implications of NUREG-1854 and to examine the feasibility and potential benefits of applying these provisions to waste determinations and supporting documents such as future performance assessments for tank residuals.« less

  7. 33 CFR 155.815 - Tank vessel integrity.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Tank vessel integrity. 155.815..., Procedures, Equipment, and Records § 155.815 Tank vessel integrity. (a) Except as provided in paragraph (b) of this section, a tank vessel underway or at anchor must have all closure mechanisms on the...

  8. 33 CFR 155.815 - Tank vessel integrity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tank vessel integrity. 155.815..., Procedures, Equipment, and Records § 155.815 Tank vessel integrity. (a) Except as provided in paragraph (b) of this section, a tank vessel underway or at anchor must have all closure mechanisms on the...

  9. 49 CFR 179.201-6 - Manways and manway closures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.201-6... in AAR Specifications for Tank Cars, appendix M, M3.03 (IBR, see § 171.7 of this subchapter). [Amdt...

  10. Tanks focus area multiyear program plan FY97-FY99

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. Themore » focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE`s national tank system. The TFA is responsible for technology development to support DOE`s four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure.« less

  11. THE INTEGRATION OF A PROPOSED ZONE CLOSURE APPROACH FOR THE PLUTONIUM FINISHING PLANT (PFP) DECOMMISSIONING & THE PFP ZONE HANFORD SITE WASHINGTON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2005-02-23

    The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less

  12. THE INTEGRATION OF THE 241-Z BUILDING DECONTAMINATION & DECOMMISSIONING (D&D) UNDER COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION & LIABILITY ACT (CERCLA) WITH RESOURCE CONSERVATION & RECOVERY ACT (RCRA) CLOSURE AT THE PLUTONIUM FINISHING PLANT (PFP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2007-02-20

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and Washington State ''Hazardous Waste Management Act, RCW 70.105'', have been deactivated and are being actively decommissioned. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building.more » The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground mining from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the ''Hanford Facility Dangerous Waste Closure Plant, 241-Z Treatment and Storage Tanks''.« less

  13. 49 CFR 179.201-6 - Manways and manway closures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.201-6 Manways and manway... Specifications for Tank Cars, appendix M, M3.03 (IBR, see § 171.7 of this subchapter). [Amdt. 179-10, 36 FR 21353...

  14. 49 CFR 179.201-6 - Manways and manway closures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.201-6 Manways and manway... Specifications for Tank Cars, appendix M, M3.03 (IBR, see § 171.7 of this subchapter). [Amdt. 179-10, 36 FR 21353...

  15. 49 CFR 179.201-6 - Manways and manway closures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.201-6 Manways and manway... Specifications for Tank Cars, appendix M, M3.03 (IBR, see § 171.7 of this subchapter). [Amdt. 179-10, 36 FR 21353...

  16. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  17. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  18. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  19. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  20. 40 CFR 280.74 - Closure records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... following ways: (a) By the owners and operators who took the UST system out of service; (b) By the current... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.74 Closure records. Owners and operators must maintain...

  1. 46 CFR 64.41 - Stop valve closure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Stop valve closure. 64.41 Section 64.41 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS Standards for an MPT § 64.41 Stop valve closure. A stop valve that operates by a screwed...

  2. 100-N Area underground storage tank closures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowley, C.A.

    1993-08-01

    This report describes the removal/characterization actions concerning underground storage tanks (UST) at the 100-N Area. Included are 105-N-LFT, 182-N-1-DT, 182-N-2-DT, 182-N-3-DT, 100-N-SS-27, and 100-N-SS-28. The text of this report gives a summary of remedial activities. In addition, correspondence relating to UST closures can be found in Appendix B. Appendix C contains copies of Unusual Occurrence Reports, and validated sampling data results comprise Appendix D.

  3. TANKS 18 AND 19-F EQUIPMENT GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    The United States Department of Energy (US DOE) intends to remove Tanks 18-F and 19-F at the Savannah River Site (SRS) from service. The high-level waste (HLW) tanks have been isolated from the F-area Tank Farm (FTF) facilities and will be filled with cementitious grout for the purpose of: (1) physically stabilizing the empty volumes in the tanks, (2) limiting/eliminating vertical pathways from the surface to residual waste on the bottom of the tanks, (3) providing an intruder barrier, and (4) providing an alkaline, chemical reducing environment within the closure boundary to limit solubility of residual radionuclides. Bulk waste andmore » heel waste removal equipment will remain in Tanks 18-F and 19-F when the tanks are closed. This equipment includes: mixer pumps, transfer pumps, transfer jets, equipment support masts, sampling masts and dip tube assemblies. The current Tank 18-F and 19-F closure strategy is to grout the internal void spaces in this equipment to eliminate fast vertical pathways and slow water infiltration to the residual material on the tank floor. This report documents the results of laboratory testing performed to identify a grout formulation for filling the abandoned equipment in Tanks 18-F and 19-F. The objective of this work was to formulate a flowable grout for filling internal voids of equipment that will remain in Tanks 18-F and 19-F during the final closures. This work was requested by V. A. Chander, Tank Farm Closure Engineering, in HLW-TTR-2011-008. The scope for this task is provided in the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The specific objectives of this task were to: (1) Prepare and evaluate the SRR cooling coil grout identified in WSRC-STI-2008-00298 per the TTR for this work. The cooling coil grout is a mixture of BASF MasterFlow{reg_sign} 816 cable grout (67.67 wt. %), Grade 100 ground granulated blast furnace slag (7.52 wt. %) and water (24.81 wt. %); (2) Identify equipment grout placement and performance properties; (3) Design up to 2 additional grout systems for filling the Tank 18-F and Tank 19-F equipment; (4) Prepare samples of candidate grouts and measure fresh properties, thermal properties and cured properties; (5) Recommend a grout for the Tier 1A equipment fill mock up - ADMP 4 foot high mock up, 1 inch and 2 inch pipes; (6) Support procurement of materials for the Tier 1A equipment fill mock up test; (7) Prepare samples of the recommended grout for hydraulic property measurements which can be used for comparison to values used in the F- Tank Farm Performance Assessment (PA); and (8) Document equipment fill grout data and recommendations in a report.« less

  4. 49 CFR 179.200-22 - Test of tanks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...

  5. 49 CFR 179.200-22 - Test of tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...

  6. 49 CFR 179.200-22 - Test of tanks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...

  7. 49 CFR 179.200-22 - Test of tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... evidence of distress. All rivets and closures, except safety relief valves or safety vents, shall be in place when test is made. (b) Insulated tanks shall be tested before insulation is applied. (c) Rubber-lined tanks shall be tested before rubber lining is applied. (d) Caulking of welded joints to stop leaks...

  8. 40 CFR 63.902 - Standards-Tank fixed roof.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section joints or between the interface of the roof edge and the tank wall. (3) Each opening in the fixed... closure devices shall include: organic vapor permeability, the effects of any contact with the liquid or its vapors managed in the tank; the effects of outdoor exposure to wind, moisture, and sunlight; and...

  9. 40 CFR 63.902 - Standards-Tank fixed roof.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section joints or between the interface of the roof edge and the tank wall. (3) Each opening in the fixed... closure devices shall include: organic vapor permeability, the effects of any contact with the liquid or its vapors managed in the tank; the effects of outdoor exposure to wind, moisture, and sunlight; and...

  10. 40 CFR 63.902 - Standards-Tank fixed roof.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section joints or between the interface of the roof edge and the tank wall. (3) Each opening in the fixed... closure devices shall include: organic vapor permeability, the effects of any contact with the liquid or its vapors managed in the tank; the effects of outdoor exposure to wind, moisture, and sunlight; and...

  11. 40 CFR 63.902 - Standards-Tank fixed roof.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section joints or between the interface of the roof edge and the tank wall. (3) Each opening in the fixed... closure devices shall include: organic vapor permeability, the effects of any contact with the liquid or its vapors managed in the tank; the effects of outdoor exposure to wind, moisture, and sunlight; and...

  12. Hanford Tanks 241-C-203 and 241-C-204: Residual Waste Contaminant Release Model and Supporting Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deutsch, William J.; Krupka, Kenneth M.; Lindberg, Michael J.

    This report describes the development of release models for key contaminants that are present in residual sludge remaining after closure of Hanford Tanks 241-C-203 (C-203) and 241-C-204 (C-204). The release models were developed from data generated by laboratory characterization and testing of samples from these two tanks. Key results from this work are (1) future releases from the tanks of the primary contaminants of concern (99Tc and 238U) can be represented by relatively simple solubility relationships between infiltrating water and solid phases containing the contaminants; and (2) high percentages of technetium-99 in the sludges (20 wt% in C-203 and 75more » wt% in C-204) are not readily water leachable, and, in fact, are very recalcitrant. This is similar to results found in related studies of sludges from Tank AY-102. These release models are being developed to support the tank closure risk assessments performed by CH2M HILL Hanford Group, Inc., for the U.S. Department of Energy.« less

  13. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less

  14. TECHNICAL ASPECTS OF UNDERGROUND STORAGE TANK CLOSURE

    EPA Science Inventory

    The overall objective of the study was to develop a deeper understanding of UST residuals at closure: their quantities, origins, physical/chemical properties, ease of removal by various cleaning methods, and their environmental mobility and persistence. The investigation covered ...

  15. Engineering study of 50 miscellaneous inactive underground radioactive waste tanks located at the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman-Pollard, J.R.

    1994-03-02

    This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less

  16. Think Tank.

    ERIC Educational Resources Information Center

    Governick, Heather; Wellington, Thom

    1998-01-01

    Examines the options for upgrading, replacing, and removal or closure of underground storage tanks (UST). Reveals the diverse regulatory control involving USTs, the Environmental Protection Agency's interest in pursuing violators, and stresses the need for administrators to be knowledgeable about state and local agency definitions of regulated…

  17. Report to Congress on a Compliance Plan for the Underground Storage Tank Program

    EPA Pesticide Factsheets

    Learn about identification of USTs that are not in compliance with Subtitle I of the Solid Waste Disposal Act or are in temporary closure, and determine the ownership of USTs not in compliance or in temporary closure

  18. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less

  19. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less

  20. 78 FR 10163 - Notice of Availability of Draft Section 3116 Basis for Determination for Closure of H Tank Farm...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... isolation in a deep geologic repository for spent fuel or high-level radioactive waste; (2) has had highly... in 10 CFR Part 61, Subpart C and pursuant to a State approved closure plan or State-issued permit; or... with the performance objectives of 10 CFR Part 61, Subpart C; pursuant to a State approved closure plan...

  1. Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less

  2. Reanalysis of Plutonium and Americium-241 in the Tank 19F Closure Grab and Core Samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swingle, R.F.

    2003-02-11

    Tank 19F is scheduled to be closed by March 2004. To close this tank, a characterization of the waste remaining in the tank was required to confirm the inventory of various species for input into groundwater transport models. This characterization has been developed by a combination of process knowledge, visual observation and sample analysis. The characterization samples were obtained by High Level Waste Division (HLWD) personnel and characterized by SRTC personnel.

  3. 40 CFR 63.906 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... between the roof and the tank wall; broken, cracked, or otherwise damaged seals or gaskets on closure devices; and broken or missing hatches, access covers, caps, or other closure devices. (2) The owner or... air pollution control equipment designated as such a written explanation of the reasons why the...

  4. TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    2012-01-03

    High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less

  5. 46 CFR 64.33 - Pipe connection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS Standards for an MPT § 64.33 Pipe connection. Each pipe connection that is not a pressure relief device must be fitted with a manually operated stop valve or closure located as close to the tank...

  6. 75 FR 3902 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... ending March 19, 2010. The State of Washington, Department of Ecology (Ecology) is a cooperating agency... and information about the Washington State Department of Ecology, contact: Annette Carlson, Nuclear... ultimate closure of Hanford. In support of Hanford's cleanup mission DOE, with Ecology as a cooperating...

  7. 49 CFR 178.337-6 - Closure for manhole.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.337-6 Closure for manhole. (a) Each cargo... this subchapter), except that a cargo tank constructed of NQT steel having a capacity of 3,500 water gallons or less may be provided with an inspection opening conforming to paragraph UG-46 and other...

  8. Photogrammetry and Laser Imagery Tests for Tank Waste Volume Estimates: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, Jim G.

    2013-03-27

    Feasibility tests were conducted using photogrammetry and laser technologies to estimate the volume of waste in a tank. These technologies were compared with video Camera/CAD Modeling System (CCMS) estimates; the current method used for post-retrieval waste volume estimates. This report summarizes test results and presents recommendations for further development and deployment of technologies to provide more accurate and faster waste volume estimates in support of tank retrieval and closure.

  9. 78 FR 15358 - DOE's Preferred Alternative for Certain Tanks Evaluated in the Final Tank Closure and Waste...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... SUPPLEMENTARY INFORMATION.) \\1\\ Transuranic (TRU) waste is waste that contains alpha particle-emitting... available on the DOE NEPA Web site at http://energy.gov/nepa . Additional information on the Final TC & WM... INFORMATION CONTACT: For further information on the Final TC & WM EIS, contact Ms. Burandt as listed in...

  10. 49 CFR 179.220-18 - Bottom outlets.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-18 Bottom outlets. (a) The... equivalent, except that bottom outlet closure plugs may be attached by 1/4-inch chain. When the bottom outlet... valve body may be steam jacketed, in which case the breakage groove or its equivalent must be below the...

  11. RCRA/UST, superfund, and EPCRA hotline training module. Introduction to: RCRA subtitle I. Underground storage tanks (40 cfr part 280). Updated as of July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This module explains the Underground Storage Tank Regulatory Program established in 1988, that includes technical requirements to prevent, protect, and clean up releases from Underground Storage Tanks (USTs), as well as financial responsibility requirements to guarantee that UST owners and operators have enough money set aside to clean up releases and compensate third parties. Describes the Universe of USTs and the technical and financial requirements that apply to them. Defines underground storage tank and provides criteria for determining which USTs are subject to regulation. Discusses deadlines for upgrading tanks and the closure and corrective action requirements.

  12. Tanks 18 And 19-F Structural Flowable Grout Fill Material Evaluation And Recommendations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Langton, C. A.; Stefanko, D. B.

    2013-04-23

    Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: 1) physically stabilize the final landfill by filling the empty volume in the tanks with a non-compressible material; 2) provide a barrier for inadvertent intrusion into the tank; 3) reduce contaminant mobility by a) limiting the hydraulic conductivity of the closed tank and b) reducing contact between the residual waste and infiltrating water; and 4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify amore » single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: 1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). 2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. 3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. 4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). 5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP#8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12. Mix, LP#8-16 is recommended for inclusion in the specification for furnishing and delivering tank closure grout for Tanks 18-F and 19-F [Forty, 2011 c]. A shrinkage compensating variation of this mix, LP#16C, has not been fully developed and characterized at this time.« less

  13. Hanford Tanks 241-C-203 and 241 C 204: Residual Waste Contaminant Release Model and Supporting Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deutsch, William J.; Krupka, Kenneth M.; Lindberg, Michael J.

    This report was revised in May 2007 to correct 90Sr values in Chapter 3. The changes were made on page 3.9, paragraph two and Table 3.10; page 3.16, last paragraph on the page; and Tables 3.21 and 3.31. The rest of the text remains unchanged from the original report issued in October 2004. This report describes the development of release models for key contaminants that are present in residual sludge remaining after closure of Hanford Tanks 241-C-203 (C-203) and 241-C-204 (C-204). The release models were developed from data generated by laboratory characterization and testing of samples from these two tanks.more » Key results from this work are (1) future releases from the tanks of the primary contaminants of concern (99Tc and 238U) can be represented by relatively simple solubility relationships between infiltrating water and solid phases containing the contaminants; and (2) high percentages of technetium-99 in the sludges (20 wt% in C-203 and 75 wt% in C-204) are not readily water leachable, and, in fact, are very recalcitrant. This is similar to results found in related studies of sludges from Tank AY-102. These release models are being developed to support the tank closure risk assessments performed by CH2M HILL Hanford Group, Inc., for the U.S. Department of Energy.« less

  14. Tank waste remediation system nuclear criticality safety program management review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  15. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less

  16. The Cementitious Barriers Partnership Experimental Programs and Software Advancing DOE’s Waste Disposal/Tank Closure Efforts – 15436

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burns, Heather; Flach, Greg; Smith, Frank

    2015-01-27

    The U.S. Department of Energy Environmental Management (DOE-EM) Office of Tank Waste Management-sponsored Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. DOE needs in this area include the following to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex: long-term performance predictions, flow sheet development and flow sheet enhancements, and conceptual designs for new disposal facilities. The DOE-EM Cementitious Barriers Partnership is producing software and experimental programs resulting in new methods andmore » data needed for end-users involved with environmental cleanup and waste disposal. Both the modeling tools and the experimental data have already benefited the DOE sites in the areas of performance assessments by increasing confidence backed up with modeling support, leaching methods, and transport properties developed for actual DOE materials. In 2014, the CBP Partnership released the CBP Software Toolbox –“Version 2.0” which provides concrete degradation models for 1) sulfate attack, 2) carbonation, and 3) chloride initiated rebar corrosion, and includes constituent leaching. These models are applicable and can be used by both DOE and the Nuclear Regulatory Commission (NRC) for service life and long-term performance evaluations and predictions of nuclear and radioactive waste containment structures across the DOE complex, including future SRS Saltstone and HLW tank performance assessments and special analyses, Hanford site HLW tank closure projects and other projects in which cementitious barriers are required, the Advanced Simulation Capability for Environmental Management (ASCEM) project which requires source terms from cementitious containment structures as input to their flow simulations, regulatory reviews of DOE performance assessments, and Nuclear Regulatory Commission reviews of commercial nuclear power plant (NPP) structures which are part of the overall US Energy Security program to extend the service life of NPPs. In addition, the CBP experimental programs have had a significant impact on the DOE complex by providing specific data unique to DOE sodium salt wastes at Hanford and SRS which are not readily available in the literature. Two recent experimental programs on cementitious phase characterization and on technetium (Tc) mobility have provided significant conclusions as follows: recent mineralogy characterization discussed in this paper illustrates that sodium salt waste form matrices are somewhat similar to but not the same as those found in blended cement matrices which to date have been used in long-term thermodynamic modeling and contaminant sequestration as a first approximation. Utilizing the CBP generated data in long-term performance predictions provides for a more defensible technical basis in performance evaluations. In addition, recent experimental studies related to technetium mobility indicate that conventional leaching protocols may not be conservative for direct disposal of Tc-containing waste forms in vadose zone environments. These results have the potential to influence the current Hanford supplemental waste treatment flow sheet and disposal conceptual design.« less

  17. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 204: STORAGE BUNKERS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Corrective Action Unit (CAU) 330 consists of four Corrective Action Sites (CASs) located in Areas 6, 22, and 23 of the Nevada Test Site (NTS). The unit is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites. CAU 330 consists of the following CASs: CAS 06-02-04, Underground Storage Tank (UST) and Piping CAS 22-99-06, Fuel Spill CAS 23-01-02, Large Aboveground Storage Tank (AST) Farm CAS 23-25-05, Asphalt Oil Spill/Tar Release

  18. NALE-IT

    EPA Pesticide Factsheets

    Technical product bulletin: this surface washing agent for oil spill cleanups is applied by pressure sprayer to pit closures, surface hydrocarbon spills, compressor stations, pipeline and flow line leaks, well head and tank farm leaks, and highway spills

  19. 49 CFR 178.338-16 - Inspection and testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... all such residue and cleaning solution must be removed from the tank prior to final closure of the... heat-treated, if such heat treatment was previously performed, and the repaired areas must be retested...

  20. High level waste tank closure project: ALARA applications at the Idaho National Engineering and Environmental Laboratory.

    PubMed

    Aitken, Steven B; Butler, Richard; Butterworth, Steven W; Quigley, Keith D

    2005-05-01

    Bechtel BWXT Idaho, Maintenance and Operating Contractor for the Department of Energy at the Idaho National Engineering and Environmental Laboratory, has emptied, cleaned, and sampled six of the eleven 1.135 x 10(6) L high level waste underground storage tanks at the Idaho Nuclear Technology and Engineering Center, well ahead of the State of Idaho Consent Order cleaning schedule. Cleaning of a seventh tank is expected to be complete by the end of calendar year 2004. The tanks, with associated vaults, valve boxes, and distribution systems, are being closed to meet Resource Conservation and Recovery Act regulations and Department of Energy orders. The use of remotely operated equipment placed in the tanks through existing tank riser access points, sampling methods and application of as-low-as-reasonably-achievable (ALARA) principles have proven effective in keeping personnel dose low during equipment removal, tank, vault, and valve box cleaning, and sampling activities, currently at 0.03 Sv.

  1. Wetter for fine dry powder

    DOEpatents

    Hall, James E.; Williams, Everett H.

    1977-01-01

    A system for wetting fine dry powders such as bentonite clay with water or other liquids is described. The system includes a wetting tank for receiving water and a continuous flow of fine powder feed. The wetting tank has a generally square horizontal cross section with a bottom end closure in the shape of an inverted pyramid. Positioned centrally within the wetting tank is a flow control cylinder which is supported from the walls of the wetting tank by means of radially extending inclined baffles. A variable speed motor drives a first larger propeller positioned immediately below the flow control cylinder in a direction which forces liquid filling the tank to flow downward through the flow control cylinder and a second smaller propeller positioned below the larger propeller having a reverse pitch to oppose the flow of liquid being driven downward by the larger propeller.

  2. ANNULUS CLOSURE TECHNOLOGY DEVELOPMENT INSPECTION/SALT DEPOSIT CLEANING MAGNETIC WALL CRAWLER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minichan, R; Russell Eibling, R; James Elder, J

    2008-06-01

    The Liquid Waste Technology Development organization is investigating technologies to support closure of radioactive waste tanks at the Savannah River Site (SRS). Tank closure includes removal of the wastes that have propagated to the tank annulus. Although amounts and types of residual waste materials in the annuli of SRS tanks vary, simple salt deposits are predominant on tanks with known leak sites. This task focused on developing and demonstrating a technology to inspect and spot clean salt deposits from the outer primary tank wall located in the annulus of an SRS Type I tank. The Robotics, Remote and Specialty Equipmentmore » (RRSE) and Materials Science and Technology (MS&T) Sections of the Savannah River National Laboratory (SRNL) collaborated to modify and equip a Force Institute magnetic wall crawler with the tools necessary to demonstrate the inspection and spot cleaning in a mock-up of a Type I tank annulus. A remote control camera arm and cleaning head were developed, fabricated and mounted on the crawler. The crawler was then tested and demonstrated on a salt simulant also developed in this task. The demonstration showed that the camera is capable of being deployed in all specified locations and provided the views needed for the planned inspection. It also showed that the salt simulant readily dissolves with water. The crawler features two different techniques for delivering water to dissolve the salt deposits. Both water spay nozzles were able to dissolve the simulated salt, one is more controllable and the other delivers a larger water volume. The cleaning head also includes a rotary brush to mechanically remove the simulated salt nodules in the event insoluble material is encountered. The rotary brush proved to be effective in removing the salt nodules, although some fine tuning may be required to achieve the best results. This report describes the design process for developing technology to add features to a commercial wall crawler and the results of the demonstration testing performed on the integrated system. The crawler was modified to address the two primary objectives of the task (inspection and spot cleaning). SRNL recommends this technology as a viable option for annulus inspection and salt removal in tanks with minimal salt deposits (such as Tanks 5 and 6.) This report further recommends that the technology be prepared for field deployment by: (1) developing an improved mounting system for the magnetic idler wheel, (2) improving the robustness of the cleaning tool mounting, (3) resolving the nozzle selection valve connections, (4) determining alternatives for the brush and bristle assembly, and (5) adding a protective housing around the motors to shield them from water splash. In addition, SRNL suggests further technology development to address annulus cleaning issues that are apparent on other tanks that will also require salt removal in the future such as: (1) Developing a duct drilling device to facilitate dissolving salt inside ventilation ducts and draining the solution out the bottom of the ducts. (2) Investigating technologies to inspect inside the vertical annulus ventilation duct.« less

  3. Deflection Analysis of the Space Shuttle External Tank Door Drive Mechanism

    NASA Technical Reports Server (NTRS)

    Tosto, Michael A.; Trieu, Bo C.; Evernden, Brent A.; Hope, Drew J.; Wong, Kenneth A.; Lindberg, Robert E.

    2008-01-01

    Upon observing an abnormal closure of the Space Shuttle s External Tank Doors (ETD), a dynamic model was created in MSC/ADAMS to conduct deflection analyses for assessing whether the Door Drive Mechanism (DDM) was subjected to excessive additional stress, and more importantly, to evaluate the magnitude of the induced step or gap with respect to shuttle s body tiles. To model the flexibility of the DDM, a lumped parameter approximation was used to capture the compliance of individual parts within the drive linkage. These stiffness approximations were then validated using FEA and iteratively updated in the model to converge on the actual distributed parameter equivalent stiffnesses. The goal of the analyses is to determine the deflections in the mechanism and whether or not the deflections are in the region of elastic or plastic deformation. Plastic deformation may affect proper closure of the ETD and would impact aero-heating during re-entry.

  4. Sampling and analyses plan for tank 103 at the 219-S waste handling facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FOWLER, K.D.

    1999-06-23

    This document describes the sampling and analysis activities associated with taking a Resource Conservation and Recovery Act (RCRA) protocol sample of the waste from Tank 103 at the 21 9-S Waste Handling Facility treatment storage, andlor disposal (TSD) unit at the 2224 Laboratory complex. This sampling and analyses is required based on negotiations between the State of Washington Department of Ecology (Ecology) and the Department of Energy, Richland Operations, (RL) in letters concerning the TPA Change Form M-32-98-01. In a letter from George H. Sanders, RL to Moses N. Jaraysi, Ecology, dated January 28,1999, it was noted that ''Prior tomore » the Tank 103 waste inventory transfer, a RCRA protocol sample of the waste will be obtained and tested for the constituents contained on the Part A, Form 3 Permit Application for the 219-S Waste Handling Facility.'' In the April 2, 1999 letter, from Brenda L. Becher-Khaleel, Ecology to James, E. Rasmussen, RL, and William O. Adair, FDH, Ecology states that the purpose of these analyses is to provide information and justification for leaving Tank 103 in an isolated condition in the 2194 TSD unit until facility closure. The data may also be used at some future date in making decisions regarding closure methodology for Tank 103. Ecology also notes that As Low As Reasonably Achievable (ALARA) concerns may force deviations from some SW-846 protocol. Every effort will be made to accommodate requirements as specified. Deviations from SW-846 will be documented in accordance with HASQARD.« less

  5. Corrective Action Decision Document for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, Nevada Operations Office

    2000-02-08

    This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminarymore » action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.« less

  6. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  7. Space Shuttle External Tank Project status

    NASA Technical Reports Server (NTRS)

    Davis, R. M.

    1980-01-01

    The External Tank Project is reviewed with emphasis on the DDT&E and production phases and the lightweight tank development. It is noted that the DDT&E phase is progressing well with the structural and ground vibration test article programs complete, the propulsion test article program progressing well, and the component qualification and verification testing 92% complete. New tools and facilities are being brought on line to support the increased build rate for the production phase. The lightweight tank, which will provide additional payload in orbit, is progressing to schedule with first delivery in early 1982.

  8. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  9. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  10. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  11. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  12. 40 CFR 271.12 - Requirements for hazardous waste management facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and 266. These standards shall include: (a) Technical standards for tanks, containers, waste piles...-closure monitoring and maintenance; (e) Groundwater monitoring; (f) Security to prevent unauthorized access to the facility; (g) Facility personnel training; (h) Inspections, monitoring, recordkeeping, and...

  13. AN EVALUATION OF HANFORD SITE TANK FARM SUBSURFACE CONTAMINATION FY2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MANN, F.M.

    2007-07-10

    The Tank Farm Vadose Zone (TFVZ) Project conducts activities to characterize and analyze the long-term environmental and human health impacts from tank waste releases to the vadose zone. The project also implements interim measures to mitigate impacts, and plans the remediation of waste releases from tank farms and associated facilities. The scope of this document is to report data needs that are important to estimating long-term human health and environmental risks. The scope does not include technologies needed to remediate contaminated soils and facilities, technologies needed to close tank farms, or management and regulatory decisions that will impact remediation andmore » closure. This document is an update of ''A Summary and Evaluation of Hanford Site Tank Farm Subsurface Contamination''. That 1998 document summarized knowledge of subsurface contamination beneath the tank farms at the time. It included a preliminary conceptual model for migration of tank wastes through the vadose zone and an assessment of data and analysis gaps needed to update the conceptual model. This document provides a status of the data and analysis gaps previously defined and discussion of the gaps and needs that currently exist to support the stated mission of the TFVZ Project. The first data-gaps document provided the basis for TFVZ Project activities over the previous eight years. Fourteen of the nineteen knowledge gaps identified in the previous document have been investigated to the point that the project defines the current status as acceptable. In the process of filling these gaps, significant accomplishments were made in field work and characterization, laboratory investigations, modeling, and implementation of interim measures. The current data gaps are organized in groups that reflect Components of the tank farm vadose zone conceptual model: inventory, release, recharge, geohydrology, geochemistry, and modeling. The inventory and release components address residual wastes that will remain in the tanks and tank-farm infrastructure after closure and potential losses from leaks during waste retrieval. Recharge addresses the impacts of current conditions in the tank farms (i.e. gravel covers that affect infiltration and recharge) as well as the impacts of surface barriers. The geohydrology and geochemistry components address the extent of the existing subsurface contaminant inventory and drivers and pathways for contaminants to be transported through the vadose zone and groundwater. Geochemistry addresses the mobility of key reactive contaminants such as uranium. Modeling addresses conceptual models and how they are simulated in computers. The data gaps will be used to provide input to planning (including the upcoming C Farm Data Quality Objective meetings scheduled this year).« less

  14. Installation restoration program. Closure assessment report for UST removals at sites 4 and 5 - petroleum, oils, and lubricants facility. Virginia Air National Guard, 192nd Fighter Group, Richmond International Airport, Sandston, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less

  15. Large-Scale Liquid Hydrogen Tank Rapid Chill and Fill Testing for the Advanced Shuttle Upper Stage Concept

    NASA Technical Reports Server (NTRS)

    Flachbart, R. H.; Hedayat, A.; Holt, K. A.; Sims, J.; Johnson, E. F.; Hastings, L. J.; Lak, T.

    2013-01-01

    Cryogenic upper stages in the Space Shuttle program were prohibited primarily due to a safety risk of a 'return to launch site' abort. An upper stage concept addressed this concern by proposing that the stage be launched empty and filled using shuttle external tank residuals after the atmospheric pressure could no longer sustain an explosion. However, only about 5 minutes was allowed for tank fill. Liquid hydrogen testing was conducted within a near-ambient environment using the multipurpose hydrogen test bed 638.5 ft3 (18m3) cylindrical tank with a spray bar mounted longitudinally inside. Although the tank was filled within 5 minutes, chilldown of the tank structure was incomplete, and excessive tank pressures occurred upon vent valve closure. Elevated tank wall temperatures below the liquid level were clearly characteristic of film boiling. The test results have substantial implications for on-orbit cryogen transfer since the formation of a vapor film would be much less inhibited due to the reduced gravity. However, the heavy tank walls could become an asset in normal gravity testing for on-orbit transfer, i.e., if film boiling in a nonflight weight tank can be inhibited in normal gravity, then analytical modeling anchored with the data could be applied to reduced gravity environments with increased confidence.

  16. Performance Assessment Program for the Savannah River Site Liquid Waste Facilities - 13610

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosenberger, Kent H.

    2013-07-01

    The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of Southmore » Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and modeling input parameters associated with the modeled features, both initial values (at the time of facility closure) and degradation rates/values. During the development of the PA, evaluations are conducted to reflect not only the results associated with the best available information at the time but also to evaluate potential uncertainties and sensitivities associated with the modeled system. While the PA will reflect the modeled system results from the best available information, it will also identify areas for future work to reduce overall PA uncertainties moving forward. DOE requires a PA Maintenance Program such that work continues to reduce model uncertainties, thus bolstering confidence in PA results that support regulatory decisions. This maintenance work may include new Research and Development activities or modeling as informed by previous PA results and other new information that becomes available. As new information becomes available, it is evaluated against previous PAs and appropriate actions are taken to ensure continued confidence in the regulatory decisions. Therefore, the PA program is a continual process that is not just the development of a PA but seeks to incorporate new information to reduce overall model uncertainty and provide continuing confidence in regulatory decisions. (author)« less

  17. Characterization of the March 2017 tank 10 surface sample (combination of HTF-10-17-30 AND HTF-10-17-31) and variable depth sample (combination of HTF-10-17-32 and HTF-10-17-33)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reboul, S. H.

    Two surface samples (HTF-10-17-30 and HTF-10-17-31) and two variable depth samples (HTF-10-17-32 and HTF-10-17-33) were collected from SRS Tank 10 during March 2017 and submitted to SRNL for characterization. At SRNL, the two surface samples were combined in one container, the two variable depth samples (VDSs) were combined in another container, and then the two composite samples were each characterized by a series of physical, ionic, radiological, and elemental analysis methods. The surface sample composite was characterized primarily for Tank Farm corrosion control purposes, while the VDS composite was characterized primarily for Tank Closure Cesium Removal (TCCR) purposes.

  18. Annual Report, Fall 2016: Alternative Chemical Cleaning of Radioactive High Level Waste Tanks - Corrosion Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wyrwas, R. B.

    The testing presented in this report is in support of the investigation of the Alternative Chemical Cleaning program to aid in developing strategies and technologies to chemically clean radioactive High Level Waste tanks prior to tank closure. The data and conclusions presented here were the examination of the corrosion rates of A285 carbon steel and 304L stainless steel exposed to two proposed chemical cleaning solutions: acidic permanganate (0.18 M nitric acid and 0.05M sodium permanganate) and caustic permanganate. (10 M sodium hydroxide and 0.05M sodium permanganate). These solutions have been proposed as a chemical cleaning solution for the retrieval ofmore » actinides in the sludge in the waste tanks, and were tested with both HM and PUREX sludge simulants at a 20:1 ratio.« less

  19. Department of Energy's first waste determinations under section 3116: how did the process work?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Picha Jr, K.G.; Kaltreider, R.; Suttora, L.

    2007-07-01

    Congress passed the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005 on October 9, 2004, and the President signed it into law on October 28, 2004. Section 3116(a) of the NDAA allows the Department of Energy (DOE) to, in consultation with the Nuclear Regulatory Commission (NRC), determine whether certain radioactive waste resulting from reprocessing of spent nuclear fuel at two DOE sites is not high-level radioactive waste, and dispose of that waste in compliance with the performance objectives set out in subpart C of 10 CFR part 61 for low-level waste. On January 17, 2006, themore » Department issued its first waste determination under the NDAA for salt waste disposal at the Savannah River Site. On November 19, 2006, the Department issued its second waste determination for closure of tanks at the Idaho Nuclear Technology and Engineering Center Tank Farm Facility. These two determinations and a third draft determination illustrate the range of issues that may be encountered in preparing a waste determination in accordance with NDAA Section 3116. This paper discusses the experiences associated with these first two completed waste determinations and an in-progress third waste determination, and discusses lessons learned from the projects that can be applied to future waste determinations. (authors)« less

  20. Inadvertent Intruder Calculatios for F Tank Farm

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koffman, L

    2005-09-12

    Savannah River National Laboratory (SRNL) has been providing radiological performance assessment analysis for Savannah River Site (SRS) solid waste disposal facilities (McDowell-Boyer 2000). The performance assessment considers numerous potential exposure pathways that could occur in the future. One set of exposure scenarios, known as inadvertent intruder analysis, considers the impact on hypothetical individuals who are assumed to inadvertently intrude onto the waste disposal site. An Automated Intruder Analysis application was developed by SRNL (Koffman 2004) that simplifies the inadvertent intruder analysis into a routine, automated calculation. Based on SRNL's experience, personnel from Planning Integration & Technology of Closure Business Unitmore » asked SRNL to assist with inadvertent intruder calculations for F Tank Farm to support the development of the Tank Closure Waste Determination Document. Meetings were held to discuss the scenarios to be calculated and the assumptions to be used in the calculations. As a result of the meetings, SRNL was asked to perform four scenario calculations. Two of the scenarios are the same as those calculated by the Automated Intruder Analysis application and these can be calculated directly by providing appropriate inputs. The other two scenarios involve use of groundwater by the intruder and the Automated Intruder Analysis application was adapted to perform these calculations. The four calculations to be performed are: (1) A post-drilling scenario in which the drilling penetrates a transfer line. (2) A calculation of internal exposure due to drinking water from a well located near a waste tank. (3) A post-drilling calculation in which waste is introduced by irrigation of the garden with water from a well located near a waste tank. (4) A resident scenario where a house is built above transfer lines. Note that calculations 1 and 4 use sources from the waste inventory in the transfer line (given in Table 1) whereas calculations 2 and 3 use sources from groundwater beneath the waste tank (given in Appendix B). It is important to recognize that there are two different sources in the calculations. In these calculations, assumptions are made for parameter values. Three key parameters are the size of the garden, the amount of vegetables eaten, and the distance of the well from the waste tank. For these three parameters, different values are considered in the calculations to determine the impact of the change in these parameters. Another key parameter is the length of time of institutional control, which determines when an inadvertent intruder could first be exposed. The standard length of time for institutional control is 100 years from the time of closure. In this analysis, waste inventory values are used from year 2005 but tanks will not be closed until year 2020. Thus, the effective length of time of institutional control used in the calculations is 115 years from year 2005, which is taken to be time zero for radiological decay calculations. All calculations are carried out for a period of 10,000 years.« less

  1. Recharge Data Package for Hanford Single-Shell Tank Waste Management Areas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fayer, Michael J.; Keller, Jason M.

    2007-09-24

    Pacific Northwest National Laboratory (PNNL) assists CH2M HILL Hanford Group, Inc., in its preparation of the Resource Conservation and Recovery Act (RCRA) Facility Investigation report. One of the PNNL tasks is to use existing information to estimate recharge rates for past and current conditions as well as future scenarios involving cleanup and closure of tank farms. The existing information includes recharge-relevant data collected during activities associated with a host of projects, including those of RCRA, the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the CH2M HILL Tank Farm Vadose Zone Project, and the PNNL Remediation and Closure Science Project.more » As new information is published, the report contents can be updated. The objective of this data package was to use published data to provide recharge estimates for the scenarios being considered in the RCRA Facility Investigation. Recharge rates were estimated for areas that remain natural and undisturbed, areas where the vegetation has been disturbed, areas where both the vegetation and the soil have been disturbed, and areas that are engineered (e.g., surface barrier). The recharge estimates supplement the estimates provided by PNNL researchers in 2006 for the Hanford Site using additional field measurements and model analysis using weather data through 2006.« less

  2. Modeling and Test Data Analysis of a Tank Rapid Chill and Fill System for the Advanced Shuttle Upper Stage (ASUS) Concept

    NASA Technical Reports Server (NTRS)

    Flachbart, Robin; Hedayat, Ali; Holt, Kimberly A.; Cruit, Wendy (Technical Monitor)

    2001-01-01

    The Advanced Shuttle Upper Stage (ASUS) concept addresses safety concerns associated .with cryogenic stages by launching empty, and filling on ascent. The ASUS employs a rapid chill and fill concept. A spray bar is used to completely chill the tank before fill, allowing the vent valve to be closed during the fill process. The first tests of this concept, using a flight size (not flight weight) tank. were conducted at Marshall Space Flight Center (MSFC) during the summer of 2000. The objectives of the testing were to: 1) demonstrate that a flight size tank could be filled in roughly 5 minutes to accommodate the shuttle ascent window, and 2) demonstrate a no-vent fill of the tank. A total of 12 tests were conducted. Models of the test facility fill and vent systems, as well as the tank, were constructed. The objective of achieving tank fill in 5 minutes was met during the test series. However, liquid began to accumulate in the tank before it was chilled. Since the tank was not chilled until the end of each test, vent valve closure during fill was not possible. Even though the chill and fill process did not occur as expected, reasonable model correlation with the test data was achieved.

  3. Alternative Chemical Cleaning Methods for High Level Waste Tanks: Simulant Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rudisill, T.; King, W.; Hay, M.

    Solubility testing with simulated High Level Waste tank heel solids has been conducted in order to evaluate two alternative chemical cleaning technologies for the dissolution of sludge residuals remaining in the tanks after the exhaustion of mechanical cleaning and sludge washing efforts. Tests were conducted with non-radioactive pure phase metal reagents, binary mixtures of reagents, and a Savannah River Site PUREX heel simulant to determine the effectiveness of an optimized, dilute oxalic/nitric acid cleaning reagent and pure, dilute nitric acid toward dissolving the bulk non-radioactive waste components. A focus of this testing was on minimization of oxalic acid additions duringmore » tank cleaning. For comparison purposes, separate samples were also contacted with pure, concentrated oxalic acid which is the current baseline chemical cleaning reagent. In a separate study, solubility tests were conducted with radioactive tank heel simulants using acidic and caustic permanganate-based methods focused on the “targeted” dissolution of actinide species known to be drivers for Savannah River Site tank closure Performance Assessments. Permanganate-based cleaning methods were evaluated prior to and after oxalic acid contact.« less

  4. Analysis on influence of guide vanes closure laws of pump-turbine on load rejection transient process

    NASA Astrophysics Data System (ADS)

    Yao, Z.; Bi, H. L.; Huang, Q. S.; Li, Z. J.; Wang, Z. W.

    2013-12-01

    In load rejection transient process, the sudden shut down of guide vanes may cause units speed rise and a sharp increase in water hammer pressure of diversion system, which endangers the safety operation of the power plant. Adopting reasonable guide vane closure law is a kind of economic and effective measurement to reduce the water hammer pressure and limit rotational speed increases. In this paper, combined with Guangzhou Pumped Storage Power Station plant A, the load rejection condition under different guide vanes closure laws is calculated and the key factor of guide vanes closure laws on the impact of the load rejection transition process is analyzed. The different inflection points, which are the closure modes, on the impact of unit speed change, water level fluctuation of surge tank, and the pressure fluctuation of volute inlet and draft tube inlet are further discussed. By compared with the calculation results, a reasonable guide vanes inflection point position can be determined according to security requirements and a reasonable guide vanes closure law can be attained to effectively coordinate the unit speed rise and the rapid pressure change in the load rejection transient process.

  5. TANKS 18 AND 19-F STRUCTURAL FLOWABLE GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    2011-11-01

    Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: (1) physically stabilize the final landfill by filling the empty volume in the tanks with a non compressible material; (2) provide a barrier for inadvertent intrusion into the tank; (3) reduce contaminant mobility by (a) limiting the hydraulic conductivity of the closed tank and (b) reducing contact between the residual waste and infiltrating water; and (4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identifymore » a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: (1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). (2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. (3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. (4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). (5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP-8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12.« less

  6. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  7. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  8. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  9. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  10. 40 CFR 280.73 - Applicability to previously closed UST systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UNDERGROUND STORAGE TANKS (UST) Out-of-Service UST Systems and Closure § 280.73 Applicability to previously closed UST systems. When directed by the implementing agency, the owner and operator of an UST system... systems. 280.73 Section 280.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  11. 77 FR 74472 - Notice of Availability of the Final Tank Closure and Waste Management Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Rooms Gonzaga University, Foley Center Library, 101-L East 502 Boone, Spokane, Washington 99258, (509) 313-5931. Portland State University, Government Information, Branford Price Millar Library, 1875 SW Park Avenue, Portland, Oregon 97201, (503) 725- 5874. University of Washington, Suzzallo-Allen Library...

  12. 75 FR 6018 - Environmental Management Site-Specific Advisory Board, Hanford

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... in the Draft Tank Closure (TC) and Waste Management (WM) Environmental Impact Statement (EIS) Overview of the Draft TC and WM EIS findings by other stakeholder groups Discussion of HAB member comments on the TC and WM EIS Development of HAB advice principles Adjourn Public Participation: The meeting...

  13. 46 CFR 32.50-15 - Cargo piping on tank vessels constructed on or after July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Except for the carriage of animal fats and vegetable oils, the system has a closure which forms a vapor... vegetable oils, the system has a metallic drop line which complies with 46 CFR 153.282. (3) Cargo piping...

  14. 46 CFR 32.50-15 - Cargo piping on tank vessels constructed on or after July 1, 1951-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Except for the carriage of animal fats and vegetable oils, the system has a closure which forms a vapor... vegetable oils, the system has a metallic drop line which complies with 46 CFR 153.282. (3) Cargo piping...

  15. Corrective Action Decision Document/Closure Report for Corrective Action 405: Area 3 Septic Systems, Tonopah Test Range, Nevada Rev. No.: 0, April 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IT Coroporation, Las Vegas, NV

    2002-04-17

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 405, Area 3 Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. Located on the Tonopah Test Range (TTR) approximately 235 miles north of Las Vegas, Nevada, CAU 405 consists of three Corrective Action Sites (CASs): 03-05-002-SW03, Septic Waste System (aka: Septic Waste System [SWS] 3); 03-05-002-SW04, Septic Waste System (aka: SWS 4); 03-05-002-SW07, Septic Waste System (aka: SWS 7). The CADD and CR have been combined into one report because no further action is recommended for this CAU, and this reportmore » provides specific information necessary to support this recommendation. The CAU consists of three leachfields and associated collection systems that were installed in or near Area 3 for wastewater disposal. These systems were used until a consolidated sewer system was installed in 1990. Historically, operations within various buildin gs in and near Area 3 of the TTR generated sanitary and industrial wastewaters. There is a potential that contaminants of concern (COCs) were present in the wastewaters and were disposed of in septic tanks and leachfields. The justification for closure of this CAU without further action is based on process knowledge and the results of the investigative activities. Closure activities were performed at these CASs between January 14 and February 2, 2002, and included the removal and proper disposal of media containing regulated constituents and proper closure of septic tanks. No further action is appropriate because all necessary activities have been completed. No use restrictions are required to be imposed for these sites since the investigation showed no evidence of COCs identified in the soil for CAU 405.« less

  16. CALUTRON ASSEMBLING AND DISASSEMBLING APPARATUS

    DOEpatents

    Andrews, R.E.

    1959-01-27

    A closure plate assembly is presented for a calutron tank. Due to the size and weight of the calutron tank a special face plate, hinges and latch construction are required. The salient feature of the invention is the provision of a face plate carrying the ion separating niechanism and adapted to close an open side of a calutron tank. A spring-type hinge secured to the face plate at one end prevents injury to the sealing gasket as the face plate is inserted and withdrawn. In additions a hinged support for the face plate comprises readily separable hinge elements, so that the face plate may first be swung outwardly from its operative position far enough to clear the ion separating meehanism carried thereby, and may thereafter be elevated and transported by a convcntional overhead crane.

  17. Estimating Residual Solids Volume In Underground Storage Tanks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, Jason L.; Worthy, S. Jason; Martin, Bruce A.

    2014-01-08

    The Savannah River Site liquid waste system consists of multiple facilities to safely receive and store legacy radioactive waste, treat, and permanently dispose waste. The large underground storage tanks and associated equipment, known as the 'tank farms', include a complex interconnected transfer system which includes underground transfer pipelines and ancillary equipment to direct the flow of waste. The waste in the tanks is present in three forms: supernatant, sludge, and salt. The supernatant is a multi-component aqueous mixture, while sludge is a gel-like substance which consists of insoluble solids and entrapped supernatant. The waste from these tanks is retrieved andmore » treated as sludge or salt. The high level (radioactive) fraction of the waste is vitrified into a glass waste form, while the low-level waste is immobilized in a cementitious grout waste form called saltstone. Once the waste is retrieved and processed, the tanks are closed via removing the bulk of the waste, chemical cleaning, heel removal, stabilizing remaining residuals with tailored grout formulations and severing/sealing external penetrations. The comprehensive liquid waste disposition system, currently managed by Savannah River Remediation, consists of 1) safe storage and retrieval of the waste as it is prepared for permanent disposition; (2) definition of the waste processing techniques utilized to separate the high-level waste fraction/low-level waste fraction; (3) disposition of LLW in saltstone; (4) disposition of the HLW in glass; and (5) closure state of the facilities, including tanks. This paper focuses on determining the effectiveness of waste removal campaigns through monitoring the volume of residual solids in the waste tanks. Volume estimates of the residual solids are performed by creating a map of the residual solids on the waste tank bottom using video and still digital images. The map is then used to calculate the volume of solids remaining in the waste tank. The ability to accurately determine a volume is a function of the quantity and quality of the waste tank images. Currently, mapping is performed remotely with closed circuit video cameras and still photograph cameras due to the hazardous environment. There are two methods that can be used to create a solids volume map. These methods are: liquid transfer mapping / post transfer mapping and final residual solids mapping. The task is performed during a transfer because the liquid level (which is a known value determined by a level measurement device) is used as a landmark to indicate solids accumulation heights. The post transfer method is primarily utilized after the majority of waste has been removed. This method relies on video and still digital images of the waste tank after the liquid transfer is complete to obtain the relative height of solids across a waste tank in relation to known and usable landmarks within the waste tank (cooling coils, column base plates, etc.). In order to accurately monitor solids over time across various cleaning campaigns, and provide a technical basis to support final waste tank closure, a consistent methodology for volume determination has been developed and implemented at SRS.« less

  18. Pressurization System Modeling for a Generic Bimese Two- Stage-to-Orbit Reusable Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Mazurkivich, Pete; Chandler, Frank; Nguyen, Han

    2005-01-01

    A pressurization system model was developed for a generic bimese Two-Stage-to-orbit Reusable Launch Vehicle using a cross-feed system and operating with densified propellants. The model was based on the pressurization system model for a crossfeed subscale water test article and was validated with test data obtained from the test article. The model consists of the liquid oxygen and liquid hydrogen pressurization models, each made up of two submodels, Booster and Orbiter tank pressurization models. The tanks are controlled within a 0.2-psi band and pressurized on the ground with ambient helium and autogenously in flight with gaseous oxygen and gaseous hydrogen. A 15-psi pressure difference is maintained between the Booster and Orbiter tanks to ensure crossfeed check valve closure before Booster separation. The analysis uses an ascent trajectory generated for a generic bimese vehicle and a tank configuration based on the Space Shuttle External Tank. It determines the flow rates required to pressurize the tanks on the ground and in flight, and demonstrates the model's capability to analyze the pressurization system performance of a full-scale bimese vehicle with densified propellants.

  19. 75 FR 1048 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... ending March 19, 2010. The State of Washington, Department of Ecology (Ecology) is a cooperating agency.... For general questions and information about the Washington State Department of Ecology, contact... Ecology as a cooperating agency, prepared the Draft TC & WM EIS in accordance with the Council on...

  20. 43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...

  1. 43 CFR 3809.420 - What performance standards apply to my notice or plan of operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or facility maintenance after project closure. Long-term, or post-mining, effluent capture and... the Resource Conservation and Recovery Act (42 U.S.C. 6901 et seq.). All garbage, refuse or waste... design. (iv) You must construct a secondary containment system around vats, tanks, or recovery circuits...

  2. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  3. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  4. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  5. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  6. UNDERGROUND STORAGE TANK SITE CLOSURE USING ACTIVE INTERVENTION FOR SITE CLEANUP

    EPA Science Inventory

    The Clean Air Act Amendments of 1990 mandate seasonal or year-round use of oxygenated compounds in gasoline in certain areas of the country. Methyl t-butyl ether (MtBE) has been the most commonly used oxygenate. However, the use of MtBE has created a significant risk to groundwat...

  7. Alternative Chemical Cleaning Methods for High Level Waste Tanks: Actual Waste Testing with SRS Tank 5F Sludge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, William D.; Hay, Michael S.

    Solubility testing with actual High Level Waste tank sludge has been conducted in order to evaluate several alternative chemical cleaning technologies for the dissolution of sludge residuals remaining in the tanks after the exhaustion of mechanical cleaning and sludge sluicing efforts. Tests were conducted with archived Savannah River Site (SRS) radioactive sludge solids that had been retrieved from Tank 5F in order to determine the effectiveness of an optimized, dilute oxalic/nitric acid cleaning reagent toward dissolving the bulk non-radioactive waste components. Solubility tests were performed by direct sludge contact with the oxalic/nitric acid reagent and with sludge that had beenmore » pretreated and acidified with dilute nitric acid. For comparison purposes, separate samples were also contacted with pure, concentrated oxalic acid following current baseline tank chemical cleaning methods. One goal of testing with the optimized reagent was to compare the total amounts of oxalic acid and water required for sludge dissolution using the baseline and optimized cleaning methods. A second objective was to compare the two methods with regard to the dissolution of actinide species known to be drivers for SRS tank closure Performance Assessments (PA). Additionally, solubility tests were conducted with Tank 5 sludge using acidic and caustic permanganate-based methods focused on the “targeted” dissolution of actinide species.« less

  8. 6. CONSTRUCTION PROGRESS VIEW (EXTERIOR) OF TANK, CABLE CHASE, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. CONSTRUCTION PROGRESS VIEW (EXTERIOR) OF TANK, CABLE CHASE, AND MOUNDED BUNKER. CONSTRUCTION WAS 99 PERCENT COMPLETE. CAMERA IS FACING WEST. INEL PHOTO NUMBER 65-5435, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  9. ANALYSIS OF SAMPLES FROM TANK 5F CHEMICAL CLEANING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poirier, M.; Fink, S.

    2011-03-07

    The Savannah River Site (SRS) is preparing Tank 5F for closure. The first step in preparing the tank for closure is mechanical sludge removal. Following mechanical sludge removal, SRS performed chemical cleaning with oxalic acid to remove the sludge heel. Personnel are currently assessing the effectiveness of the chemical cleaning. SRS personnel collected liquid samples during chemical cleaning and submitted them to Savannah River National Laboratory (SRNL) for analysis. Following chemical cleaning, they collected a solid sample (also known as 'process sample') and submitted it to SRNL for analysis. The authors analyzed these samples to assess the effectiveness of themore » chemical cleaning process. The conclusions from this work are: (1) With the exception of iron, the dissolution of sludge components from Tank 5F agreed with results from the actual waste demonstration performed in 2007. The fraction of iron removed from Tank 5F by chemical cleaning was significantly less than the fraction removed in the SRNL demonstrations. The likely cause of this difference is the high pH following the first oxalic acid strike. (2) Most of the sludge mass remaining in the tank is iron and nickel. (3) The remaining sludge contains approximately 26 kg of barium, 37 kg of chromium, and 37 kg of mercury. (4) Most of the radioactivity remaining in the residual material is beta emitters and {sup 90}Sr. (5) The chemical cleaning removed more than {approx} 90% of the uranium isotopes and {sup 137}Cs. (6) The chemical cleaning removed {approx} 70% of the neptunium, {approx} 83% of the {sup 90}Sr, and {approx} 21% of the {sup 60}Co. (7) The chemical cleaning removed less than 10% of the plutonium, americium, and curium isotopes. (8) The chemical cleaning removed more than 90% of the aluminium, calcium, and sodium from the tank. (9) The cleaning operations removed 61% of lithium, 88% of non-radioactive strontium, and 65% of zirconium. The {sup 90}Sr and non-radioactive strontium were measured by different methods, and the differences in the fraction removed are not statistically significant. (10) Chemical cleaning removed 10-50% of the barium, chromium, iron, magnesium, manganese, and silicon. (11) Chemical cleaning removed only {approx}1% of the nickel.« less

  10. Preliminary experience with a new device for delayed sternal closure strategy in cardiac surgery.

    PubMed

    Santini, Francesco; Onorati, Francesco; Telesca, Mariassunta; Faggian, Giuseppe; Mazzucco, Alessandro

    2012-06-01

    Open chest management with delayed sternal closure (DSC) is a valuable strategy in the management of patients with postcardiotomy hemodynamic instability or severe coagulopathy. The conventional extemporized material available for off-label sternal stenting however may limit its efficacy. We evaluated outcomes of patients with refractory severe postcardiotomy cardiogenic shock (SPCCS) treated with DSC using a novel temporary sternal spreader (NTSS) which allows myocardial recovery by progressive controlled approximation of the sternal edges. Seven patients (4 male, mean age 66.5 ± 5 years) with refractory SPCCS showing acute hemodynamic instability at sternal closure, were implanted with the NTSS, consisting of stainless-steel branches linked to 2 diverging plates of polyether-ether ketone, whose progressive opening/closing mechanism can be controlled from outside the chest with a rotating steel wire. The sternal wound was closed by an elastic membrane to achieve a sterile field. Swan-Ganz monitoring was employed, and clinical outcomes evaluated. The device was successfully implanted in all patients without device-related complications or failures. Progressive approximation of sternal edges, titrated on cardiac index values, was successfully completed allowing subsequent uneventful sternal closure in all. Mean time from SPCCS to sternal closure was 70 ± 21 hours. No patient developed infective complications or late hemodynamic instability after device removal and sternal closure. One patient (14%) died of multiorgan failure on postoperative day 9. Despite the limited number of patients enrolled, the NTSS proved safe and effective in allowing complete myocardial recovery after SPCCS, avoiding hemodynamic instability related to abrupt sternal closure, with no occurrence of infective complications.

  11. 75 FR 13268 - Extension of the Public Comment Period for the Draft Tank Closure and Waste Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Management Environmental Impact Statement for the Hanford Site, Richland, WA AGENCY: Department of Energy... Statement for the Hanford Site, Richland, Washington (Draft EIS, DOE/EIS-00391), made available for public... Draft EIS is also available through the Hanford Web site at: http://www.hanford.gov/orp . Issued in...

  12. Fort Holabird Defense Investigative Service (DIS), Base Realignment and Closure (BRAC) Cleanup Plan (BCP), Version II

    DTIC Science & Technology

    1998-12-01

    3-16 3.4.7 Category 7: Areas Not Evaluated or Require Additional Evaluation .................... 3-16...Alternatives Evaluation Process for DIS Disposal and Reuse, Fort Holabird, Maryland ........ 2-6 Figure 3-1. Environmental Restoration Early Action...Requirement AREE ............... Area Requiring Environmental Evaluation AST .................. Above-ground Storage Tank BCP .................. BRAC

  13. Tank Riser Pit Decontamination System (Pit Viper) Return on Investment and Break-Even Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Joan K.; Weimar, Mark R.; Balducci, Patrick J.

    2003-06-30

    This study assessed the cost benefit of Pit Viper deployment for 80 tank farm pits between October 1, 2003 and September 30, 2012 under the technical baseline for applicable double-shell tank (DST) and single-shell tank (SST) projects. After this assessment had been completed, the U.S. Department of Energy (DOE) Richland Operations Office (RL) and Office of River Protection (ORP) published the Hanford Performance Management Plan (August 2003), which accelerated the schedule for SST retrieval. Then, DOE/CH2M HILL contract modification M064 (October 2002) and The Integrated Mission Acceleration Plan (March 2003) further accelerated SST retrieval and closure schedules. Twenty-six to 40more » tanks must be retrieved by 2006. Thus the schedule for SST pit entries is accelerated and the number of SST pit entries is increased. This study estimates the return on investment (ROI) and the number of pits where Pit Viper deployment would break even or save money over current manual practices. The results of the analysis indicate a positive return on the federal investment for deployment of the Pit Viper provided it is used on a sufficient number of pits.« less

  14. One-Piece Battery Incorporating A Circulating Fluid Type Heat Exchanger

    DOEpatents

    Verhoog, Roelof

    2001-10-02

    A one-piece battery comprises a tank divided into cells each receiving an electrode assembly, closure means for the tank and a circulating fluid type heat exchanger facing the relatively larger faces of the electrode assembly. The fluid flows in a compartment defined by two flanges which incorporate a fluid inlet orifice communicating with a common inlet manifold and a fluid outlet orifice communicating with a common outlet manifold. The tank comprises at least two units and each unit comprises at least one cell delimited by walls. The wall facing a relatively larger face of the electrode assembly constitutes one of the flanges. Each unit further incorporates a portion of an inlet and outlet manifold. The units are fastened together so that the flanges when placed face-to-face form a sealed circulation compartment and the portions of the same manifold are aligned with each other.

  15. NRC Consultation and Monitoring at the Savannah River Site: Focusing Reviews of Two Different Disposal Actions - 12181

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ridge, A. Christianne; Barr, Cynthia S.; Pinkston, Karen E.

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms,more » and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)« less

  16. Durability of central aortic valve closure in patients with continuous flow left ventricular assist devices.

    PubMed

    McKellar, Stephen H; Deo, Salil; Daly, Richard C; Durham, Lucian A; Joyce, Lyle D; Stulak, John M; Park, Soon J

    2014-01-01

    A competent aortic valve is essential to providing effective left ventricular assist device support. We have adopted a practice of central aortic valve closure by placing a simple coaptation stitch at left ventricular assist device implantation in patients with significant aortic insufficiency. We conducted a follow-up study to evaluate the efficacy and durability of this procedure. The study included patients who had undergone continuous flow left ventricular assist device implantation. The patients were divided into 2 groups, those who did not require any aortic procedure because the valve was competent and those who underwent central aortic valve closure for mild or greater aortic regurgitation. The clinical endpoints were mortality, progression or recurrence of aortic insufficiency, and reoperation for aortic valve pathologic features. Aortic insufficiency was measured qualitatively from mild to severe on a scale of 0 to 5. A total of 123 patients received continuous flow left ventricular assist devices from February 2007 to August 2011. Of those, 18 (15%) underwent central aortic valve closure at left ventricular assist device implantation because of significant aortic insufficiency (1.8 ± 1.4) and 105 who did not (competent aortic valve, 0.15 ± 0.43; P < .01). At follow-up (median, 312 days; range, 0-1429 days), the mean aortic insufficiency score remained low for the patients with central aortic valve closure (0.27 ± 0.46) in contrast to those without central aortic valve closure who experienced aortic insufficiency progression (0.78 ± 0.89; P = .02). In addition, the proportion of patients with more than mild aortic insufficiency was significantly less in the central aortic valve closure group (0% vs 18%; P = .05). The patients in the central aortic valve closure group were significantly older and had a greater incidence of renal failure at baseline. The 30-day mortality was greater in the central aortic valve closure group, but the late survival was similar between the 2 groups. No reoperations were required for recurrent aortic insufficiency. The results of our study have shown that repair of aortic insufficiency with a simple central coaptation stitch is effective and durable in left ventricular assist device-supported patients, with follow-up extending into 2 years. Although aortic insufficiency progressed over time in those with minimal native valve regurgitation initially, no such progression was noted in those with central aortic valve closure. Additional investigation is needed to evaluate whether prophylactic central aortic valve closure should be performed at left ventricular assist device implantation to avoid problematic aortic regurgitation developing over time, in particular in patients undergoing left ventricular assist device implantation for life-long (destination therapy) support. Copyright © 2014 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.

  17. Bubblers Speed Nuclear Waste Processing at SRS

    ScienceCinema

    None

    2018-05-23

    At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

  18. Iridotomy to slow progression of angle-closure glaucoma

    PubMed Central

    Le, Jimmy T; Rouse, Benjamin; Gazzard, Gus

    2016-01-01

    This is the protocol for a review and there is no abstract. The objectives are as follows: The primary objective is to assess the role of iridotomy-compared with observation-in the prevention of visual field loss for individuals who have primary angle closure or primary angle-closure glaucoma in at least one eye. We will also examine the role of iridotomy in the prevention of elevated intraocular pressure (IOP) in individuals with narrow angles (primary angle-closure suspect) in at least one eye. PMID:27551238

  19. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suber, Gregory

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less

  20. PLUTONIUM FINISHING PLANT (PFP) 241-Z LIQUID WASTE TREATMENT FACILITY DEACTIVATION AND DEMOLITION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JOHNSTON GA

    2008-01-15

    Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique with in the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site.more » The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site . All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individual confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.« less

  1. Romanenko looks through a Rodnik Tank in the SM

    NASA Image and Video Library

    2012-12-31

    ISS034-E-010446 (31 Dec. 2012) --- Russian cosmonaut Roman Romanenko, Expedition 34 flight engineer, looks through a Rodnik tank in the Zvezda Service Module of the International Space Station. Romanenko performed a water transfer from a Rodnik tank in the Progress to a Rodnik tank in the Zvezda Service Module. Note the multiple refractions of the cosmonaut?s head and shoulders in the bubbles.

  2. 5. CONSTRUCTION PROGRESS VIEW OF ASSEMBLY USED TO RAISE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. CONSTRUCTION PROGRESS VIEW OF ASSEMBLY USED TO RAISE AND LOWER FUEL ELEMENTS. TAKEN FROM TOP OF SHIELDING TANK WITH CAMERA POINTING TOWARDS BOTTOM OF TANK. SHOWS LADDER, SQUARE LIFTING FRAME, FUEL ELEMENT HOLDERS, AND CABLE CYLINDERS. INEL PHOTO NUMBER 65-5434, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, W. D.

    In order to appropriately model and predict the chemical integrity and performance of cementitious materials used for waste immobilization at the Savannah River Site (SRS), it is critical to understand the I-129 solubility and distribution within the tank farm. Iodine in radioactive waste and in environmental media is typically highly mobile and long lived. Iodine is ubiquitous in SRS tank waste and waste forms. The iodine is assumed to be soluble and present at low levels in Performance Assessments (PAs) for SRS Tank Farms, and is one of the dose drivers in the PAs for both the SRS Salt Disposalmore » Facility (SDF) and the H-Area Tank Farm (HTF). Analysis of tank waste samples is critical to understanding the Tank Farm iodine inventory and reducing disposal uncertainty. Higher than expected iodine levels have recently been observed in residual solids isolated from some SRS tanks prior to closure, indicating uncertainty regarding the chemical species involved. If the iodine inventory uncertainty is larger than anticipated, future work may be necessary to reduce the uncertainty. This memorandum satisfies a portion of the work scope identified in Task Plan SRNL-RP-2016-00651. A separate memorandum issued previously, reported historical unpublished I-129 data, a significant portion of which was below detectable analytical limits. This memorandum includes iodine and general chemical analysis results for six archived SRNL samples which were previously reported to have I-129 concentrations below detectable limits. Lower sample dilution factors were used for the current analyses in order to obtain concentrations above detection. The samples analyzed included surface and depth samples from SRS tanks 30, 32, and 39.« less

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2010-04-01

    Corrective Action Unit 560 comprises seven corrective action sites (CASs): •03-51-01, Leach Pit •06-04-02, Septic Tank •06-05-03, Leach Pit •06-05-04, Leach Bed •06-59-03, Building CP-400 Septic System •06-59-04, Office Trailer Complex Sewage Pond •06-59-05, Control Point Septic System The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 560 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from October 7, 2008, through February 24, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, and Recordmore » of Technical Change No. 1. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern (COCs) are present. •If COCs are present, determine their nature and extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 560 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: •No contamination exceeding the FALs was identified at CASs 03-51-01, 06-04-02, and 06-59-04. •The soil at the base of the leach pit chamber at CAS 06-05-03 contains arsenic above the FAL of 23 milligrams per kilogram (mg/kg) and polychlorinated biphenyl (PCBs) above the FAL of 0.74 mg/kg, confined vertically from a depth of approximately 5 to 20 feet (ft) below ground surface. The contamination is confined laterally to the walls of the leach pit chamber and leach rock. The contamination present at CAS 06-05-03 within the leach pit was not feasible to remove. •The surface and subsurface soils within and surrounding the septic system at CAS 06-05-04 contained PCB concentrations above the FAL of 0.74 mg/kg. The lateral and vertical extent of COCs was determined for this CAS. Contaminated soils were removed up to within 18 ft of the building. The remaining contamination is confined to subsurface soils adjacent to and beneath Building CP-162 and was not feasible to remove. •The solid materials within the septic tank and soils immediately surrounding the inlet end of the tank at CAS 06-59-03 contained benzo(a)pyrene above the FAL of 0.21 mg/kg. The soils, tank contents, and tank were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. •The solids contained within the septic tank and inlet pipe at CAS 06-59-05 contained the following contaminants above their respective FALs: PCBs, arsenic, lead, benzo(a)pyrene, and pesticides. The tank and inlet pipe contents were removed. Materials remaining at this CAS do not contain contamination exceeding FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following corrective action recommendations: •No further action for CASs 03-51-01, 06-04-02, and 06-59-04, as no contaminants of potential concern were present that exceed FALs. •Closure in place for CAS 06-05-03 under a corrective action with a use restriction (UR) for remaining PCB- and arsenic-impacted potential source material (PSM). The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •Closure in place for CAS 06-05-04 under a corrective action with a UR for remaining PCBs in soil adjacent to and beneath Building CP-162. The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and NNSA/NSO CAU/CAS files. •No further action for CAS 06-59-03, as the COC of benzo(a)pyrene in soil and PSM have been removed. •No further action for CAS 06-59-05, as the COCs in PSM within the septic tank and inlet piping have been removed and the tank was filled with concrete.« less

  5. Effects of hydrated lime on radionuclides stabilization of Hanford tank residual waste.

    PubMed

    Wang, Guohui; Um, Wooyong; Cantrell, Kirk J; Snyder, Michelle M V; Bowden, Mark E; Triplett, Mark B; Buck, Edgar C

    2017-10-01

    Chemical stabilization of tank residual waste is part of a Hanford Site tank closure strategy to reduce overall risk levels to human health and the environment. In this study, a set of column leaching experiments using tank C-104 residual waste were conducted to evaluate the leachability of uranium (U) and technetium (Tc) where grout and hydrated lime were applied as chemical stabilizing agents. The experiments were designed to simulate future scenarios where meteoric water infiltrates through the vadose zones into the interior of the tank filled with layers of grout or hydrated lime, and then contacts the residual waste. Effluent concentrations of U and Tc were monitored and compared among three different packing columns (waste only, waste + grout, and waste + grout + hydrated lime). Geochemical modeling of the effluent compositions was conducted to determine saturation indices of uranium solid phases that could control the solubility of uranium. The results indicate that addition of hydrated lime strongly stabilized the uranium through transforming uranium to a highly insoluble calcium uranate (CaUO 4 ) or similar phase, whereas no significant stabilization effect of grout or hydrated lime was observed on Tc leachability. The result implies that hydrated lime could be a great candidate for stabilizing Hanford tank residual wastes where uranium is one of the main concerns. Published by Elsevier Ltd.

  6. Deep inferior epigastric artery perforator flap donor-site closure with cannula-assisted, limited undermining, and progressive high-tension sutures versus standard abdominoplasty: complications, sensitivity, and cosmetic outcomes.

    PubMed

    Visconti, Giuseppe; Tomaselli, Federica; Monda, Anna; Barone-Adesi, Liliana; Salgarello, Marzia

    2015-01-01

    In deep inferior epigastric artery perforator (DIEP) flap breast reconstruction, abdominal donor-site cosmetic and sensibility outcomes and the closure technique have drawn little attention in the literature, with many surgeons still following the principles of standard abdominoplasty. In this article, the authors report their experience with the cannula-assisted, limited undermining, and progressive high-tension suture ("CALP") technique of DIEP donor-site closure compared with standard abdominoplasty. Between December of 2008 and January of 2013, 137 consecutive women underwent DIEP flap breast reconstruction. Of these, 82 patients (between December of 2008 and November of 2011) underwent DIEP flap donor-site closure by means of standard abdominoplasty (control group) and 55 patients (from December of 2011 to January of 2013) by means of cannula-assisted, limited undermining, and progressive high-tension suture (study group). The abdominal drainage daily output, donor-site complications, abdominal skin sensitivity at 1-year follow-up, cosmetic outcomes, and patient satisfaction were recorded and analyzed statistically. Daily drainage output was significantly lower in the study group. Donor-site complications were significantly higher in the control group (37.8 percent versus 9 percent). Seroma and wound healing problems were experienced in the control group. Abdominal skin sensibility was better preserved in the study group. Overall, abdominal wall aesthetic outcomes were similar in both groups, except for scar quality (better in the study group). According to the authors' experience, cannula-assisted, limited undermining, and progressive high-tension suture should be always preferred to standard abdominoplasty for DIEP donor-site closure to reduce the complication rate to improve abdominal skin sensitivity and scar quality. Therapeutic, II.

  7. Think tanks and influence on US foreign policy: The people and the ideas

    DTIC Science & Technology

    2016-06-26

    Strategic and International Studies CSP Center for Security Policy DLC Democratic Leadership Council FPI Foreign Policy Initiative IISS International...1977) followed in the same vein. The Progressive Policy Institute (PPI)(1989), established as the research element of the Democratic Leadership Council...President of the United States, the Progressive Policy Institute (PPI) was established as a think tank for the Democratic Leadership Council (DLC). It

  8. Ideological Think Tanks in the States: An Inventory of Their Prevalence, Networks, and Higher Education Policy Activity

    ERIC Educational Resources Information Center

    Ness, Erik C.; Gándara, Denisa

    2014-01-01

    This study takes an inventory of a particular type of intermediary organization ascendant within the state-level higher education policy: ideological think tanks. Our inventory identifies 99 think tanks: 59 affiliated with the conservative State Policy Network and 40 with the Progressive States Network. The analysis shows that state-level…

  9. Cementitious Barriers Partnership - FY2015 End-Year Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burns, H. H.; Flach, G. P.; Langton, C. A.

    2015-09-17

    The DOE-EM Office of Tank Waste Management Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. Therefore, the CBP ultimate purpose is to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex. This status report highlights the CBP 2015 Software and Experimental Program efforts and accomplishments that support DOE needs in environmental cleanup and waste disposal. DOE needs in this area include: Long-term performance predictions to provide credibility (i.e., a defensible technical basis)more » for regulator and DOE review and approvals, Facility flow sheet development/enhancements, and Conceptual designs for new disposal facilities. In 2015, the CBP developed a beta release of the CBP Software Toolbox – “Version 3.0”, which includes new STADIUM carbonation and damage models, a new SRNL module for estimating hydraulic properties and flow in fractured and intact cementitious materials, and a new LeachXS/ORCHESTRA (LXO) oxidation module. In addition, the STADIUM sulfate attack and chloride models have been improved as well as the LXO modules for sulfate attack, carbonation, constituent leaching, and percolation with radial diffusion (for leaching and transport in cracked cementitious materials). These STADIUM and LXO models are applicable to and can be used by both DOE and the Nuclear Regulatory Commission (NRC) end-users for service life prediction and long-term leaching evaluations of radioactive waste containment structures across the DOE complex.« less

  10. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  11. In-Tank Elutriation Test Report And Independent Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burns, H. H.; Adamson, D. J.; Qureshi, Z. H.

    2011-04-13

    The Department of Energy (DOE) Office of Environmental Management (EM) funded Technology Development and Deployment (TDD) to solve technical problems associated with waste tank closure for sites such as Hanford Site and Savannah River Site (SRS). One of the tasks supported by this funding at Savannah River National Laboratory (SRNL) and Pacific Northwest Laboratory (PNNL) was In-Tank Elutriation. Elutriation is the process whereby physical separation occurs based on particle size and density. This report satisfies the first phase of Task WP_1.3.1.1 In-Tank Elutriation, which is to assess the feasibility of this method of separation in waste tanks at Hanford Sitemore » and SRS. This report includes an analysis of scoping tests performed in the Engineering Development Laboratory of SRNL, analysis of Hanford's inadvertent elutriation, the viability of separation methods such as elutriation and hydrocyclones and recommendations for a path forward. This report will demonstrate that the retrieval of Hanford salt waste tank S-112 very successfully decreased the tank's inventories of radionuclides. Analyses of samples collected from the tank showed that concentrations of the major radionuclides Cs-136 and Sr-90 were decreased by factors of 250 and 6 and their total curie tank inventories decreased by factors of 60,000 and 2000. The total tank curie loading decreased from 300,000 Ci to 55 Ci. The remaining heel was nearly all innocuous gibbsite, Al(OH){sub 3}. However, in the process of tank retrieval approximately 85% of the tank gibbsite was also removed. Significant amounts of money and processing time could be saved if more gibbsite could be left in tanks while still removing nearly all of the radionuclides. There were factors which helped to make the elutriation of Tank S-112 successful which would not necessarily be present in all salt tanks. 1. The gibbsite particles in the tank were surprisingly large, as much as 200 {micro}m. The gibbsite crystals had probably grown in size over a period of decades. 2. The radionuclides were apparently either in the form of soluble compounds, like cesium, or micrometer sized particles of actinide oxides or hydroxides. 3. After the initial tank retrieval the tank contained cobble which is not conducive to elutriation. Only after the tank contents were treated with thousands of gallons of 50 wt% caustic, were the solids converted to sand which is compatible with elutriation. Discussions between SRNL and PNNL resulted in plans to test elutriation in two phases; in Phase 1 particles would be separated by differences in settling velocity in an existing scaled tank with its associated hardware and in Phase 2 additional hardware, such as a hydrocyclone, would be added downstream to separate slow settling partciels from liquid. Phase 1 of in-tank elutriation was tested for Proof of Principle in theEngineering Development Laboratory of SRNL in a 41" diameter, 87 gallon tank. The tank had been previously used as a 1/22 scale model of Hanford Waste Tank AY-102. The objective of the testing was to determine which tank operating parameters achieved the best separation between fast- and slow-settling particles. For Phase 1 testing a simulated waste tank supernatant, slow-settling particles and fast-settling particles were loaded to the scaled tank. Because this was a Proof of Principle test, readily available solids particles were used that represented fast-settling and slow-settling particles. The tank contents were agitated using rotating mixer jet pumps (MJP) which suspended solids while liquids and solids were drawn out of the tank with a suction tube. The goal was to determine the optimum hydraulic operating conditions to achieve clean separation in which the residual solids in the tank were nearly all fast-settling particles and the solids transferred out of the tank were nearly all slow-settling particles. Tests were conducted at different pump jet velocities, suction tube diameters and suction tube elevations. Testing revealed that the most important variable was jet velocity which translates to a downstream fluid velocity in the vicinity of the suction tube which can suspend particles and potentially allow their removal from the tank. The optimum jet velocity in the vicinity of the sucti9on tube was between 1.5 and 2 ft/s (4-5 gpm). During testing at lower velocities a significant amount of slow-settling particles remained in the tank. At higher velocities a significant amount of fast-settling particles were elutriated from the tank. It should be noted that this range of velocities is appropriate for this particular geometry and particles. However, the principle of In-Tank Elutriation was proved. In-tank elutriation has the potential to save much money in tank closure. However, more work, both analytical and experimental, must be done before an improved version of the process could be applied to actual waste tanks. It is recommended that testing with more prototypic simulants be conducted. Also, scale-up criteria for elutriation and the resulting size of pilot scale test equipment require investigation during future research. In addition, it is recommended that the use of hydrocyclones be pursued in Phase 2 testing. Hydrocyclones are a precise and efficient separation tool that are frequently used in industry.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. N. Doyle

    Corrective Action Unit (CAU) 254 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles) northwest of Las Vegas, Nevada. The site is located within the Reactor Maintenance, Assembly and Disassembly (R-MAD) compound and consists of Building 3126, two outdoor decontamination pads, and surrounding areas within an existing fenced area measuring approximately 50 x 37 meters (160 x 120 feet). The site was used from the early 1960s to the early 1970s as part of the Nuclear Rocket Development Station program to decontaminate test-car hardware and tooling. The site was reactivated in themore » early 1980s to decontaminate a radiologically contaminated military tank. This Closure Report (CR) describes the closure activities performed to allow un-restricted release of the R-MAD Decontamination Facility.« less

  13. A closure test for time-specific capture-recapture data

    USGS Publications Warehouse

    Stanley, T.R.; Burnham, K.P.

    1999-01-01

    The assumption of demographic closure in the analysis of capture-recapture data under closed-population models is of fundamental importance. Yet, little progress has been made in the development of omnibus tests of the closure assumption. We present a closure test for time-specific data that, in principle, tests the null hypothesis of closed-population model M(t) against the open-population Jolly-Seber model as a specific alternative. This test is chi-square, and can be decomposed into informative components that can be interpreted to determine the nature of closure violations. The test is most sensitive to permanent emigration and least sensitive to temporary emigration, and is of intermediate sensitivity to permanent or temporary immigration. This test is a versatile tool for testing the assumption of demographic closure in the analysis of capture-recapture data.

  14. Calculating Depth of Closure Using WIS Hindcast Data

    DTIC Science & Technology

    2016-03-01

    revised the Hallermeier (1978, 1981) equations using data from the Duck , NC, U.S. Army Corps of Engineers (USACE) Field Research Facility. Many studies ... Study (WIS) hindcast stations along the United States coastlines. The results summarized in this CHETN are available in the form of a spreadsheet on...theoretical definition of DOC came from a study by Hallermeier (1978, 1981) using wave tank and field data. Initially, the DOC was related to the critical

  15. NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.

    2013-07-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities inmore » the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely NRC's role will change from doing both consultation and monitoring to being focused on monitoring activities within NDAA. DOE has identified other activities at the Hanford Nuclear Reservation that would continue consultation activities but outside of the NDAA in the future. During the past seven years of consultations and monitoring a number of lessons learned about the process, communication issues, and technical guidance have been identified. With the change in focus from reviewing initial performance assessments and draft waste determinations to long-term monitoring (e.g., individual waste tank closure, at F Tank Farm or complete tank farm closure at INTEC expected in the near future), the NRC is going to revise and update its guidance over the next few years to reflect the lessons learned and the change in focus. In addition to the lessons learned, improvements in the guidance will have to account possible rule and guidance changes underway within Part 61. This paper will discuss the initial plans, approaches, and time lines to revise the guidance within NUREG-1854, including opportunities for public involvement. (authors)« less

  16. KSC-04pd2133

    NASA Image and Video Library

    2004-10-14

    KENNEDY SPACE CENTER, FLA. - Workers in the transfer aisle of the Vehicle Assembly Building check the progress of External Tank 118 (ET-118) as it is lowered onto the transporter below it. The tank will be transferred to NASA’s Michoud Assembly Facility in New Orleans. The tank is being installed with an improved bipod fitting, which connects the external fuel tank to the Shuttle during launch. The new design, a significant milestone in the effort to return the Shuttle to safe flight, replaces the foam that was used to prevent ice buildup on the tank’s bipod fittings with four rod-shaped heaters. The heaters are being retrofitted on the 11 existing tanks and incorporated into the manufacture of all new tanks.

  17. Computations of turbulent lean premixed combustion using conditional moment closure

    NASA Astrophysics Data System (ADS)

    Amzin, Shokri; Swaminathan, Nedunchezhian

    2013-12-01

    Conditional Moment Closure (CMC) is a suitable method for predicting scalars such as carbon monoxide with slow chemical time scales in turbulent combustion. Although this method has been successfully applied to non-premixed combustion, its application to lean premixed combustion is rare. In this study the CMC method is used to compute piloted lean premixed combustion in a distributed combustion regime. The conditional scalar dissipation rate of the conditioning scalar, the progress variable, is closed using an algebraic model and turbulence is modelled using the standard k-ɛ model. The conditional mean reaction rate is closed using a first order CMC closure with the GRI-3.0 chemical mechanism to represent the chemical kinetics of methane oxidation. The PDF of the progress variable is obtained using a presumed shape with the Beta function. The computed results are compared with the experimental measurements and earlier computations using the transported PDF approach. The results show reasonable agreement with the experimental measurements and are consistent with the transported PDF computations. When the compounded effects of shear-turbulence and flame are strong, second order closures may be required for the CMC.

  18. The non-canonical Wnt-PCP pathway shapes the mouse caudal neural plate.

    PubMed

    López-Escobar, Beatriz; Caro-Vega, José Manuel; Vijayraghavan, Deepthi S; Plageman, Timothy F; Sanchez-Alcazar, José A; Moreno, Roberto Carlos; Savery, Dawn; Márquez-Rivas, Javier; Davidson, Lance A; Ybot-González, Patricia

    2018-05-08

    The last stage of neural tube (NT) formation involves closure of the caudal neural plate (NP), an embryonic structure formed by neuromesodermal progenitors and newly differentiated cells that becomes incorporated into the NT. Here, we show in mouse that, as cell specification progresses, neuromesodermal progenitors and their progeny undergo significant changes in shape prior to their incorporation into the NT. The caudo-rostral progression towards differentiation is coupled to a gradual reliance on a unique combination of complex mechanisms that drive tissue folding, involving pulses of apical actomyosin contraction and planar polarised cell rearrangements, all of which are regulated by the Wnt-PCP pathway. Indeed, when this pathway is disrupted, either chemically or genetically, the polarisation and morphology of cells within the entire caudal NP is disturbed, producing delays in NT closure. The most severe disruptions of this pathway prevent caudal NT closure and result in spina bifida. In addition, a decrease in Vangl2 gene dosage also appears to promote more rapid progression towards a neural fate, but not the specification of more neural cells. © 2018. Published by The Company of Biologists Ltd.

  19. Two consecutive microtubule-based epithelial seaming events mediate dorsal closure in the scuttle fly Megaselia abdita.

    PubMed

    Fraire-Zamora, Juan Jose; Jaeger, Johannes; Solon, Jérôme

    2018-03-14

    Evolution of morphogenesis is generally associated with changes in genetic regulation. Here, we report evidence indicating that dorsal closure, a conserved morphogenetic process in dipterans, evolved as the consequence of rearrangements in epithelial organization rather than signaling regulation. In Drosophila melanogaster , dorsal closure consists of a two-tissue system where the contraction of extraembryonic amnioserosa and a JNK/Dpp-dependent epidermal actomyosin cable result in microtubule-dependent seaming of the epidermis. We find that dorsal closure in Megaselia abdita, a three-tissue system comprising serosa, amnion and epidermis, differs in morphogenetic rearrangements despite conservation of JNK/Dpp signaling. In addition to an actomyosin cable, M. abdita dorsal closure is driven by the rupture and contraction of the serosa and the consecutive microtubule-dependent seaming of amnion and epidermis. Our study indicates that the evolutionary transition to a reduced system of dorsal closure involves simplification of the seaming process without changing the signaling pathways of closure progression. © 2018, Fraire-Zamora et al.

  20. Two consecutive microtubule-based epithelial seaming events mediate dorsal closure in the scuttle fly Megaselia abdita

    PubMed Central

    Jaeger, Johannes

    2018-01-01

    Evolution of morphogenesis is generally associated with changes in genetic regulation. Here, we report evidence indicating that dorsal closure, a conserved morphogenetic process in dipterans, evolved as the consequence of rearrangements in epithelial organization rather than signaling regulation. In Drosophila melanogaster, dorsal closure consists of a two-tissue system where the contraction of extraembryonic amnioserosa and a JNK/Dpp-dependent epidermal actomyosin cable result in microtubule-dependent seaming of the epidermis. We find that dorsal closure in Megaselia abdita, a three-tissue system comprising serosa, amnion and epidermis, differs in morphogenetic rearrangements despite conservation of JNK/Dpp signaling. In addition to an actomyosin cable, M. abdita dorsal closure is driven by the rupture and contraction of the serosa and the consecutive microtubule-dependent seaming of amnion and epidermis. Our study indicates that the evolutionary transition to a reduced system of dorsal closure involves simplification of the seaming process without changing the signaling pathways of closure progression. PMID:29537962

  1. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  2. Proposed Closure of Los Angeles Air Force Base, California and Relocation of Space Systems Division

    DTIC Science & Technology

    1990-07-01

    rendered temporarily out of service in accordance with state and federal regulations. Aboveground ground tanks associated with Building 130 would...Lowell, and Charles R. Smith 1978 Gabrielino. In Handbook of North American Indians-California, edited by Robert F.3 Heizer . Smithsonian Institution...8, California, edited3 by R.F. Heizer , p. 575-587. Smithsonian Institution, Washington DC. Bean, L.J. and F. Shipek 1978 Luiseno. In The Handbook of

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, J.A.; Clauss, S.A.; Grant, K.E.

    The objectives of this task are to develop and document extraction and analysis methods for organics in waste tanks, and to extend these methods to the analysis of actual core samples to support the Waste Tank organic Safety Program. This report documents progress at Pacific Northwest Laboratory (a) during FY 1994 on methods development, the analysis of waste from Tank 241-C-103 (Tank C-103) and T-111, and the transfer of documented, developed analytical methods to personnel in the Analytical Chemistry Laboratory (ACL) and 222-S laboratory. This report is intended as an annual report, not a completed work.

  4. Semantic Evaluation of Syntactic Structure: Evidence from Eye Movements

    ERIC Educational Resources Information Center

    Frazier, Lyn; Carminati, Maria Nella; Cook, Anne E.; Majewski, Helen; Rayner, Keith

    2006-01-01

    An eye movement study of temporarily ambiguous closure sentences confirmed that the early closure penalty in a sentence like "While John hunted the frightened deer escaped" is larger for a simple past verb ("hunted") than for a past progressive verb ("was hunting"). The results can be explained by the observation that simple past tense verbs…

  5. Corrective action plan for corrective action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nacht, S.

    1999-08-01

    The Mercury Fire Training Pit is a former fire training area located in Area 23 of the Nevada Test Site (NTS). The Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting personnel at the NTS, and encompasses an area approximately 107 meters (m) (350 feet [ft]) by 137 m (450 ft). The Mercury Fire Training Pit formerly included a bermed burn pit with four small burn tanks, four large above ground storage tanks an overturned bus, a telephone pole storage area, and areas for burning sheds, pallets, and cables. Closure activities will includemore » excavation of the impacted soil in the aboveground storage tank and burn pit areas to a depth of 1.5 m (5 ft), and excavation of the impacted surface soil downgradient of the former ASTs and burnpit areas to a depth of 0.3 m (1 ft). Excavated soil will be disposed in the Area 6 Hydrocarbon Landfill at the NTS.« less

  6. Analytical methods for the development of Reynolds stress closures in turbulence

    NASA Technical Reports Server (NTRS)

    Speziale, Charles G.

    1990-01-01

    Analytical methods for the development of Reynolds stress models in turbulence are reviewed in detail. Zero, one and two equation models are discussed along with second-order closures. A strong case is made for the superior predictive capabilities of second-order closure models in comparison to the simpler models. The central points are illustrated by examples from both homogeneous and inhomogeneous turbulence. A discussion of the author's views concerning the progress made in Reynolds stress modeling is also provided along with a brief history of the subject.

  7. CORRRECTIVE ACTION DECISION DOCUMENT FOR CORRECTIVE ACTION UNIT 427: AREA 3 SEPTIC WASTE SYSTEMS 2 AND 6, TONOPAH TEST RANGE, NEVADA, REVISION 0, JUNE 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ITLV.

    1998-06-01

    This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less

  8. The 1980 report on NRL energy storage program

    NASA Astrophysics Data System (ADS)

    Chubb, T. A.; Nemecek, J. J.; Simmons, D. E.; Veith, R. J.

    1981-03-01

    The development of a means for bulk storage of energy in a form capable of providing demand sensitive steam, heat, or cooling is described. Salt eutectic systems availability and costs of salts, progress on the 2 MWht energy storage boiler tank under construction at NRL, and major elements of storage system costs for this 2 MWht tank which employs a heat transfer fluid are discussed. A radiation coupled energy storage tank concept is also discussed.

  9. Annual report, spring 2015. Alternative chemical cleaning methods for high level waste tanks-corrosion test results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wyrwas, R. B.

    The testing presented in this report is in support of the investigation of the Alternative Chemical Cleaning program to aid in developing strategies and technologies to chemically clean radioactive High Level Waste tanks prior to tank closure. The data and conclusions presented here were the examination of the corrosion rates of A285 carbon steel and 304L stainless steel when interacted with the chemical cleaning solution composed of 0.18 M nitric acid and 0.5 wt. % oxalic acid. This solution has been proposed as a dissolution solution that would be used to remove the remaining hard heel portion of the sludgemore » in the waste tanks. This solution was combined with the HM and PUREX simulated sludge with dilution ratios that represent the bulk oxalic cleaning process (20:1 ratio, acid solution to simulant) and the cumulative volume associated with multiple acid strikes (50:1 ratio). The testing was conducted over 28 days at 50°C and deployed two methods to invest the corrosion conditions; passive weight loss coupon and an active electrochemical probe were used to collect data on the corrosion rate and material performance. In addition to investigating the chemical cleaning solutions, electrochemical corrosion testing was performed on acidic and basic solutions containing sodium permanganate at room temperature to explore the corrosion impacts if these solutions were to be implemented to retrieve remaining actinides that are currently in the sludge of the tank.« less

  10. Understanding School Closures: Discriminatory Impact on Chicano and Black Students. Policy Research Monograph No. 1.

    ERIC Educational Resources Information Center

    Valencia, Richard R.

    The monograph covers the background, progress, and outcome of the "Castro case," a racial discrimination lawsuit filed in 1982 by a group of Chicano and Black parents and their children against the Phoenix (Arizona) Union High School District alleging that their 94% minority high school was unfairly singled out for closure due to a…

  11. [Progress on the Rule of Clavicle Epiphyseal Closure Using Multi-Imaging Technology].

    PubMed

    Fan, F; Tu, M; Luo, Y Z; Zhang, K; Chen, X G; Deng, Z H

    2016-08-01

    People aged 18 years could be punished lightly or diminished criminal responsibility, even be spared the death sentence, which has important meaning in Chinese judicatory adjudication. The epiphysis of long bones from human limbs and the secondary sexual characteristics almost have developed completely before 18 years old. Clavicle epiphysis is one of the articular metaphysis which has a late epiphyseal closure. The recent studies in exploring the rule of clavicle epiphyseal by multi-imaging technology shows that the development of clavicle epiphysis has some value in age estimation of 18 years old. CT, especially thin-section CT, is widely used at present. However, thin-section CT scanning has great net radiation, which is not ethically acceptable if it is not for diagnosis and treatment. MRI is nonradioactive tomographic imaging and easy to evaluate, which is one of the future research directions in forensic age estimation using the medial clavicle. This paper summarizes the progress on the rule of clavicle epiphyseal closure, and analyzes and summarizes the feasibility of rule of clavicle epiphyseal closure applies on age estimation. Copyright© by the Editorial Department of Journal of Forensic Medicine.

  12. RCRA, superfund and EPCRA hotline training module. Introduction to: Land disposal units (40 cfr parts 264/265, subparts k, l, m, n) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module provides an overview of the requirements for landfills, surface impoundments, waste piles, and land treatment units. It summarizes the differences between interim status (Part 265) and permitted (Part 264) standards for land disposal units. It defines `surface impoundment` and distinguishes surface impoundments from tanks and describes surface impoundment retrofitting and retrofitting variance procedures. It explains the connection between land disposal standards, post-closure, and groundwater monitoring.

  13. LITERATURE REVIEW ON THE SORPTION OF PLUTONIUM, URANIUM, NEPTUNIUM, AMERICIUM AND TECHNETIUM TO CORROSION PRODUCTS ON WASTE TANK LINERS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, D.; Kaplan, D.

    2012-02-29

    The Savannah River Site (SRS) has conducted performance assessment (PA) calculations to determine the risk associated with closing liquid waste tanks. The PA estimates the risk associated with a number of scenarios, making various assumptions. Throughout all of these scenarios, it is assumed that the carbon-steel tank liners holding the liquid waste do not sorb the radionuclides. Tank liners have been shown to form corrosion products, such as Fe-oxyhydroxides (Wiersma and Subramanian 2002). Many corrosion products, including Fe-oxyhydroxides, at the high pH values of tank effluent, take on a very strong negative charge. Given that many radionuclides may have netmore » positive charges, either as free ions or complexed species, it is expected that many radionuclides will sorb to corrosion products associated with tank liners. The objective of this report was to conduct a literature review to investigate whether Pu, U, Np, Am and Tc would sorb to corrosion products on tank liners after they were filled with reducing grout (cementitious material containing slag to promote reducing conditions). The approach was to evaluate radionuclides sorption literature with iron oxyhydroxide phases, such as hematite ({alpha}-Fe{sub 2}O{sub 3}), magnetite (Fe{sub 3}O{sub 4}), goethite ({alpha}-FeOOH) and ferrihydrite (Fe{sub 2}O{sub 3} {center_dot} 0.5H{sub 2}O). The primary interest was the sorption behavior under tank closure conditions where the tanks will be filled with reducing cementitious materials. Because there were no laboratory studies conducted using site specific experimental conditions, (e.g., high pH and HLW tank aqueous and solid phase chemical conditions), it was necessary to extend the literature review to lower pH studies and noncementitious conditions. Consequently, this report relied on existing lower pH trends, existing geochemical modeling, and experimental spectroscopic evidence conducted at lower pH levels. The scope did not include evaluating the appropriateness of K{sub d} values for the Fe-oxyhydroxides, but instead to evaluate whether it is a conservative assumption to exclude this sorption process of radionuclides onto tank liner corrosion products in the PA model. This may identify another source for PA conservatism since the modeling did not consider any sorption by the tank liner.« less

  14. CENTRAL PLATEAU REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach tomore » Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.« less

  15. Closing Rocky Flats by 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuor, N. R.; Schubert, A. L.

    2002-02-26

    Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal.more » This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.« less

  16. Progress toward hydrogen peroxide micropulsion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitehead, J C; Dittman, M D; Ledebuhr, A G

    1999-07-08

    A new self-pressurizing propulsion system has liquid thrusters and gas jet attitude control without heavy gas storage vessels. A pump boosts the pressure of a small fraction of the hydrogen peroxide, so that reacted propellant can controllably pressurize its own source tank. The warm decomposition gas also powers the pump and is supplied to the attitude control jets. The system has been incorporated into a prototype microsatellite for terrestrial maneuvering tests. Additional progress includes preliminary testing of a bipropellant thruster, and storage of unstabilized hydrogen peroxide in small sealed tanks.

  17. Improved Polyurethane Storage Tank Performance

    DTIC Science & Technology

    2014-06-30

    condition occurred if water overflowed from the tank vent prior to reaching 45 gallons. A spline curve was drawn around the perimeter of each image so...estimated footprint and height envelope was added for spatial reference. A spline color code key was developed, so that the progression of the tanks...Table 4.5.3). A standard flat plate platen was used for the double butt seams and some closing seams by one fabricator. The other utilized a “Slinky

  18. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-08-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd{sup 3} of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.« less

  19. Ectocranial suture closure in Pan troglodytes and Gorilla gorilla: pattern and phylogeny.

    PubMed

    Cray, James; Meindl, Richard S; Sherwood, Chet C; Lovejoy, C Owen

    2008-08-01

    The order in which ectocranial sutures undergo fusion displays species-specific variation among primates. However, the precise relationship between suture closure and phylogenetic affinities is poorly understood. In this study, we used Guttman Scaling to determine if the modal progression of suture closure differs among Homo sapiens, Pan troglodytes, and Gorilla gorilla. Because DNA sequence homologies strongly suggest that P. troglodytes and Homo sapiens share a more recent common ancestor than either does with G. gorilla, we hypothesized that this phylogenetic relationship would be reflected in the suture closure patterns of these three taxa. Results indicated that while all three species do share a similar lateral-anterior closure pattern, G. gorilla exhibits a unique vault pattern, which, unlike humans and P. troglodytes, follows a strong posterior-to-anterior gradient. P. troglodytes is therefore more like Homo sapiens in suture synostosis. Copyright 2008 Wiley-Liss, Inc.

  20. Tank 241-AX-104 upper vadose zone cone penetrometer demonstration sampling and analysis plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FIELD, J.G.

    1999-02-02

    This sampling and analysis plan (SAP) is the primary document describing field and laboratory activities and requirements for the tank 241-AX-104 upper vadose zone cone penetrometer (CP) demonstration. It is written in accordance with Hanford Tank Initiative Tank 241-AX-104 Upper Vadose Zone Demonstration Data Quality Objective (Banning 1999). This technology demonstration, to be conducted at tank 241-AX-104, is being performed by the Hanford Tanks Initiative (HTI) Project as a part of Tank Waste Remediation System (TWRS) Retrieval Program (EM-30) and the Office of Science and Technology (EM-50) Tanks Focus Area. Sample results obtained as part of this demonstration will providemore » additional information for subsequent revisions to the Retrieval Performance Evaluation (RPE) report (Jacobs 1998). The RPE Report is the result of an evaluation of a single tank farm (AX Tank Farm) used as the basis for demonstrating a methodology for developing the data and analyses necessary to support making tank waste retrieval decisions within the context of tank farm closure requirements. The RPE includes a study of vadose zone contaminant transport mechanisms, including analysis of projected tank leak characteristics, hydrogeologic characteristics of tank farm soils, and the observed distribution of contaminants in the vadose zone in the tank farms. With limited characterization information available, large uncertainties exist as to the nature and extent of contaminants that may exist in the upper vadose zone in the AX Tank Farm. Traditionally, data has been collected from soils in the vadose zone through the installation of boreholes and wells. Soil samples are collected as the bore hole is advanced and samples are screened on site and/or sent to a laboratory for analysis. Some in-situ geophysical methods of contaminant analysis can be used to evaluate radionuclide levels in the soils adjacent to an existing borehole. However, geophysical methods require compensation for well casing interference and soil moisture content and may not be successful in some conditions. In some cases the level of interference must be estimated due to uncertainties regarding the materials used in well construction and soil conditions, Well casing deployment used for many in-situ geophysical methods is relatively expensive and geophysical methods do not generally provide real time values for contaminants. In addition, some of these methods are not practical within the boundaries of the tank farm due to physical constraints, such as underground piping and other hardware. The CP technologies could facilitate future characterization of vadose zone soils by providing vadose zone data in near real-time, reducing the number of soil samples and boreholes required, and reducing characterization costs.« less

  1. Flammable gas data evaluation. Progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitney, P.D.; Meyer, P.A.; Miller, N.E.

    1996-10-01

    The Hanford Site is home to 177 large, underground nuclear waste storage tanks. Numerous safety and environmental concerns surround these tanks and their contents. One such concern is the propensity for the waste in these tanks to generate, retain, and periodically release flammable gases. This report documents some of the activities of the Flammable Gas Project Data Evaluation Task conducted for Westinghouse Hanford Company during fiscal year 1996. Described in this report are: (1) the results of examining the in-tank temperature measurements for insights into gas release behavior; (2) the preliminary results of examining the tank waste level measurements formore » insights into gas release behavior; and (3) an explanation for the observed hysteresis in the level/pressure measurements, a phenomenon observed earlier this year when high-frequency tank waste level measurements came on-line.« less

  2. An evaluation of oxygen-hydrogen propulsion systems for the Space Station

    NASA Technical Reports Server (NTRS)

    Klemetson, R. W.; Garrison, P. W.; Hannum, N. P.

    1985-01-01

    Conceptual designs for O2/H2 chemical and resistojet propulsion systems for the space station was developed and evaluated. The evolution of propulsion requirements was considered as the space station configuration and its utilization as a space transportation node change over the first decade of operation. The characteristics of candidate O2/H2 auxiliary propulsion systems are determined, and opportunities for integration with the OTV tank farm and the space station life support, power and thermal control subsystems are investigated. OTV tank farm boiloff can provide a major portion of the growth station impulse requirements and CO2 from the life support system can be a significant propellant resource, provided it is not denied by closure of that subsystem. Waste heat from the thermal control system is sufficient for many propellant conditioning requirements. It is concluded that the optimum level of subsystem integration must be based on higher level space station studies.

  3. Annual Progress Report on the Development of Waste Tank Leak Monitoring and Detection and Mitigation Activities in Support of M-45-08

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH PRICE, C.

    2000-09-25

    Milestone M-45-09E of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) [TPA 1996] requires submittal of an annual progress report on the development of waste tank leak detection, monitoring, and mitigation (LDMM) activities associated with the retrieval of waste from single-shell tanks (SSTs). This report details progress for fiscal year 2000, building on the current LDMM strategy and including discussion of technologies, applications, cost, schedule, and technical data. The report also includes discussion of demonstrations conducted and recommendations for additional testing. Tri-Party Agreement Milestones M-45-08A and M-45-08B required design and demonstration of LDMM systems for initialmore » retrieval of SST waste. These specific milestones have recently been deleted as part of the M-45-00A change package. Future LDMM development work has been incorporated into specific technology demonstration milestones and SST waste retrieval milestones in the M-45-03 and M-45-05 milestone series.« less

  4. Fifth Single-Shell Tank Integrity Project Expert Panel Meeting August 28-29, 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Todd M.; Gunter, Jason R.; Boomer, Kayle D.

    On August 28th and 29th, 2014 the Single-Shell Tank Integrity Project (SSTIP) Expert Panel (Panel) convened in Richland, Washington. This was the Panel’s first meeting since 2011 and, as a result, was focused primarily on updating the Panel on progress in response to the past recommendations (Single-Shell Tank Integrity Expert Panel Report, RPP-RPT-45921, Rev 0, May 2010). This letter documents the Panel’s discussions and feedback on Phase I activities and results.

  5. High-freezing-point fuel studies

    NASA Technical Reports Server (NTRS)

    Tolle, F. F.

    1980-01-01

    Considerable progress in developing the experimental and analytical techniques needed to design airplanes to accommodate fuels with less stringent low temperature specifications is reported. A computer technique for calculating fuel temperature profiles in full tanks was developed. The computer program is being extended to include the case of partially empty tanks. Ultimately, the completed package is to be incorporated into an aircraft fuel tank thermal analyser code to permit the designer to fly various thermal exposure patterns, study fuel temperatures versus time, and determine holdup.

  6. Proceedings of the Fourth Annual Deep Brain Stimulation Think Tank: A Review of Emerging Issues and Technologies

    PubMed Central

    Deeb, Wissam; Giordano, James J.; Rossi, Peter J.; Mogilner, Alon Y.; Gunduz, Aysegul; Judy, Jack W.; Klassen, Bryan T.; Butson, Christopher R.; Van Horne, Craig; Deny, Damiaan; Dougherty, Darin D.; Rowell, David; Gerhardt, Greg A.; Smith, Gwenn S.; Ponce, Francisco A.; Walker, Harrison C.; Bronte-Stewart, Helen M.; Mayberg, Helen S.; Chizeck, Howard J.; Langevin, Jean-Philippe; Volkmann, Jens; Ostrem, Jill L.; Shute, Jonathan B.; Jimenez-Shahed, Joohi; Foote, Kelly D.; Wagle Shukla, Aparna; Rossi, Marvin A.; Oh, Michael; Pourfar, Michael; Rosenberg, Paul B.; Silburn, Peter A.; de Hemptine, Coralie; Starr, Philip A.; Denison, Timothy; Akbar, Umer; Grill, Warren M.; Okun, Michael S.

    2016-01-01

    This paper provides an overview of current progress in the technological advances and the use of deep brain stimulation (DBS) to treat neurological and neuropsychiatric disorders, as presented by participants of the Fourth Annual DBS Think Tank, which was convened in March 2016 in conjunction with the Center for Movement Disorders and Neurorestoration at the University of Florida, Gainesveille FL, USA. The Think Tank discussions first focused on policy and advocacy in DBS research and clinical practice, formation of registries, and issues involving the use of DBS in the treatment of Tourette Syndrome. Next, advances in the use of neuroimaging and electrochemical markers to enhance DBS specificity were addressed. Updates on ongoing use and developments of DBS for the treatment of Parkinson's disease, essential tremor, Alzheimer's disease, depression, post-traumatic stress disorder, obesity, addiction were presented, and progress toward innovation(s) in closed-loop applications were discussed. Each section of these proceedings provides updates and highlights of new information as presented at this year's international Think Tank, with a view toward current and near future advancement of the field. PMID:27920671

  7. Dural closure for the treatment of superficial siderosis.

    PubMed

    Egawa, Satoru; Yoshii, Toshitaka; Sakaki, Kyohei; Inose, Hiroyuki; Kato, Tsuyoshi; Kawabata, Shigenori; Tomizawa, Shoji; Okawa, Atsushi

    2013-04-01

    Superficial siderosis (SS) of the CNS is a rare disease caused by repeated hemorrhages in the subarachnoid space. The subsequent deposition of hemosiderin in the brain and spinal cord leads to the progression of neurological deficits. The causes of bleeding include prior intradural surgery, carcinoma, arteriovenous malformation, nerve root avulsion, and dural abnormality. Recently, surgical treatment of SS associated with dural defect has been reported. The authors of the present report describe 2 surgically treated SS cases and review the literature on surgically treated SS. The patients had dural defects with fluid-filled collections in the spinal canal. In both cases, the dural defects were successfully closed, and the fluid collection was resolved postoperatively. In one case, the neurological symptoms did not progress postoperatively. In the other case, the patient had long history of SS, and the clinical manifestations partially deteriorated after surgery, despite the successful dural closure. In previously reported surgically treated cases, the dural defects were closed by sutures, patches, fibrin glue, or muscle/fat grafting. Regardless of the closing method, dural defect closure has been shown to stop CSF leakage and subarachnoid hemorrhaging. Successfully repairing the defect can halt the disease progression in most cases and may improve the symptoms that are associated with CSF hypovolemia. However, the effect of the dural closure may be limited in patients with long histories of SS because of the irreversibility of the neural tissue damage caused by hemosiderin deposition. In patients with SS, it is important to diagnose and repair the dural defect early to minimize the neurological impairments that are associated with dural defects.

  8. Experimental and theoretical modelling of sand-water-object interaction under nonlinear progressive waves

    NASA Astrophysics Data System (ADS)

    Testik, Firat Yener

    An experimental and theoretical study has been conducted to obtain a fundamental understanding of the dynamics of the sand, water and a solid object interaction as progressive gravity waves impinge on a sloping beach. Aside from obvious scientific interest, this exceedingly complex physical problem is important for naval applications, related to the behavior of disk/cylindrical shaped objects (mines) in the coastal waters. To address this problem, it was divided into a set of simpler basic problems. To begin, nonlinear progressive waves were investigated experimentally in a wave tank for the case of a rigid (impermeable) sloping bottom. Parameterizations for wave characteristics were proposed and compared with the experiments. In parallel, a numerical wave tank model (NWT) was calibrated using experimental data from a single run, and wave field in the wave tank was simulated numerically for the selected experiments. Subsequently, a layer of sand was placed on the slope and bottom topography evolution processes (ripple and sandbar dynamics, bottom topography relaxation under variable wave forcing, etc.) were investigated experimentally. Models for those processes were developed and verified by experimental measurements. Flow over a circular cylinder placed horizontally on a plane wall was also studied. The far-flow field of the cylinder placed in the wave tank was investigated experimentally and numerical results from the NWT simulations were compared with the experimental data. In the mean time, the near-flow velocity/vorticity field around a short cylinder under steady and oscillatory flow was studied in a towing tank. Horseshoe vortex formation and periodic shedding were documented and explained. With the understanding gained through the aforementioned studies, dynamics and burial/scour around the bottom objects in the wave tank were studied. Possible scenarios on the behavior of the disk-shaped objects were identified and explained. Scour around 3D cylindrical objects was investigated. Different scour regimes were identified experimentally and explained theoretically. Proper physical parameterizations on the time evolution and equilibrium scour characteristics were proposed and verified experimentally.

  9. Unstrained and strained flamelets for LES of premixed combustion

    NASA Astrophysics Data System (ADS)

    Langella, Ivan; Swaminathan, Nedunchezhian

    2016-05-01

    The unstrained and strained flamelet closures for filtered reaction rate in large eddy simulation (LES) of premixed flames are studied. The required sub-grid scale (SGS) PDF in these closures is presumed using the Beta function. The relative performances of these closures are assessed by comparing numerical results from large eddy simulations of piloted Bunsen flames of stoichiometric methane-air mixture with experimental measurements. The strained flamelets closure is observed to underestimate the burn rate and thus the reactive scalars mass fractions are under-predicted with an over-prediction of fuel mass fraction compared with the unstrained flamelet closure. The physical reasons for this relative behaviour are discussed. The results of unstrained flamelet closure compare well with experimental data. The SGS variance of the progress variable required for the presumed PDF is obtained by solving its transport equation. An order of magnitude analysis of this equation suggests that the commonly used algebraic model obtained by balancing source and sink in this transport equation does not hold. This algebraic model is shown to underestimate the SGS variance substantially and the implications of this variance model for the filtered reaction rate closures are highlighted.

  10. Defining Higher-Order Turbulent Moment Closures with an Artificial Neural Network and Random Forest

    NASA Astrophysics Data System (ADS)

    McGibbon, J.; Bretherton, C. S.

    2017-12-01

    Unresolved turbulent advection and clouds must be parameterized in atmospheric models. Modern higher-order closure schemes depend on analytic moment closure assumptions that diagnose higher-order moments in terms of lower-order ones. These are then tested against Large-Eddy Simulation (LES) higher-order moment relations. However, these relations may not be neatly analytic in nature. Rather than rely on an analytic higher-order moment closure, can we use machine learning on LES data itself to define a higher-order moment closure?We assess the ability of a deep artificial neural network (NN) and random forest (RF) to perform this task using a set of observationally-based LES runs from the MAGIC field campaign. By training on a subset of 12 simulations and testing on remaining simulations, we avoid over-fitting the training data.Performance of the NN and RF will be assessed and compared to the Analytic Double Gaussian 1 (ADG1) closure assumed by Cloudy Layers Unified By Binormals (CLUBB), a higher-order turbulence closure currently used in the Community Atmosphere Model (CAM). We will show that the RF outperforms the NN and the ADG1 closure for the MAGIC cases within this diagnostic framework. Progress and challenges in using a diagnostic machine learning closure within a prognostic cloud and turbulence parameterization will also be discussed.

  11. Head loss coefficient through sharp-edged orifices

    NASA Astrophysics Data System (ADS)

    Adam, Nicolas J.; De Cesare, Giovanni; Schleiss, Anton J.; Richard, Sylvain; Muench-Alligné, Cécile

    2016-11-01

    Nowadays, high-head power plants could increase their installed power capacity for many reasons, e.g. dam heightening, increase of their peak power capacity or refurbishment with new turbines. Frequently, due to several considerations, e.g. topographical or economical limitations, the existing surge tank cannot be extended to keep previous safety levels and efficiency. A valuable way to adapt these surge tanks is to place a throttle at their entrance like, for example, an orifice. The main effect of this adaptation is the introduction of head losses that reduce the extreme levels in the surge tank due to the mass oscillations resulting from a closure or opening of downstream discharge control. This research studies the influence of the edge angle of a ASME-standard orifice on the head losses. This angle introduces an asymmetrical behavior and influences head losses. Different angles are tested from 0° to the 67° (biggest angle possible for this configuration). The first step of this study is to determine experimentally the steady losses produced by orifice for several discharges. In the second step, a numerical model on ANSYS CFX is performed. Combining the two approaches, it is possible to understand and quantify the effect of the edge angle.

  12. Assessment of single-shell tank residual-liquid issues at Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murthy, K.S.; Stout, L.A.; Napier, B.A.

    1983-06-01

    This report provides an assessment of the overall effectiveness and implications of jet pumping the interstitial liquids (IL) from single-shell tanks at Hanford. The jet-pumping program, currently in progress at Hanford, involves the planned removal of IL contained in 89 of the 149 single-shell tanks and its transfer to double-shell tanks after volume reduction by evaporation. The purpose of this report is to estimate the public and worker doses associated with (1) terminating pumping immediately, (2) pumping to a 100,000-gal limit per tank, (3) pumping to a 50,000-gal limit per tank, and (4) pumping to the maximum practical liquid removalmore » level of 30,000 gal. Assessment of the cost-effectiveness of these various levels of pumping in minimizing any undue health and safety risks to the public or worker is also presented.« less

  13. Characterization of the SRNL-Washed tank 51 sludge batch 9 qualification sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pareizs, J. M.

    2016-01-01

    Savannah River National Laboratory (SRNL) personnel have been requested to qualify the next sludge batch (Sludge Batch 9 – SB9) for processing at the Defense Waste Processing Facility (DWPF). To accomplish this task, Savannah River Remediation (SRR) sent SRNL a 3-L sample of Tank 51H slurry to be characterized, washed, and then used in a lab-scale demonstration of the DWPF flowsheet (after combining with Tank 40H sludge). SRNL has washed the Tank 51H sample per the Tank Farm washing strategy as of October 20, 2015. A part of the qualification process is extensive radionuclide and chemical characterization of the SRNL-washedmore » Tank 51H slurry. This report documents the chemical characterization of the washed slurry; radiological characterization is in progress and will be documented in a separate report. The analytical results of this characterization are comparable to the Tank Farm projections. Therefore, it is recommended that SRNL use this washed slurry for the ongoing SB9 qualification activities.« less

  14. Developing NDE Techniques for Large Cryogenic Tanks

    NASA Technical Reports Server (NTRS)

    Parker, Don; Starr, Stan; Arens, Ellen

    2011-01-01

    The Shuttle Program requires very large cryogenic ground storage tanks in which to store liquid oxygen and hydrogen. The existing Pads A and B Launch Complex-39 tanks, which will be passed onto future launch programs, are 45 years old and have received minimal refurbishment and only external inspections over the years. The majority of the structure is inaccessible without a full system drain of cryogenic liquid and granular insulation in the annular region. It was previously thought that there was a limit to the number of temperature cycles that the tanks could handle due to possible insulation compaction before undergoing a costly and time consuming complete overhaul; therefore the tanks were not drained and performance issues with these tanks, specifically the Pad B liquid hydrogen tank, were accepted. There is a needind an opportunity, as the Shuttle program ends and work to upgrade the launch pads progresses, to develop innovative non-destructive evaluation (NDE) techniques to analyze the current tanks. Techniques are desired that can aid in determining the extent of refurbishment required to keep the tanks in service for another 20+ years. A nondestructive technique would also be a significant aid in acceptance testing of new and refurbished tanks, saving significant time and money, if corrective actions can be taken before cryogen is introduced to the systems.

  15. Mechanisms for ductus arteriosus closure.

    PubMed

    Coceani, Flavio; Baragatti, Barbara

    2012-04-01

    Closure of the ductus arteriosus at birth is a complex phenomenon being conditioned by antenatal events and progressing in preprogrammed steps. Functional at first, narrowing of the vessel is determined by 2 overlapping processes--removal of the prostaglandin E(2)-based relaxation sustaining prenatal patency and activation of a constrictor mechanism by the natural rise in blood oxygen tension. Two schemes have been proposed for oxygen action--one involving a cytochrome P450 hemoprotein (sensor)/endothelin-1 (effector) complex and the other a set of voltage-gated K(+) channels. These proposals, however, are not mutually exclusive. Structural closure follows the constriction through a remodeling process initiated antenatally with the development of intimal cushions and completed postnatally by a host of humoral and mechanical stimuli. Research in this area has already provided clinical applications. Nevertheless, management of premature infants with persistent ductus remains troublesome and calls for an alternative approach to the prostaglandin E(2) inhibitors now in use. Studies in progress on the oxygen-sensing system may lead to a definitive solution for this problem. Copyright © 2012 Elsevier Inc. All rights reserved.

  16. Groundwater quality assessment plan for single-shell waste management area B-BX-BY at the Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SM Narbutovskih

    2000-03-31

    Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), themore » owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.« less

  17. FFRRO Program Information

    EPA Pesticide Factsheets

    This asset includes information related to Cleanups at Federal Facilities. Information is provided about contaminated federal facility sites in specific communities, with access to technical fact sheets and tools and resources to help government agencies and their contractors fulfill cleanup obligations. EPA's federal facility information is easily accessible to ensure effective stakeholder involvement and accountability at federal facilities.Multiple federal statutes establish requirements for EPA and other federal agencies to protect health and the human environment through cleanups at Federal Facilities, including the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, which was amended by the Superfund Amendments and Reauthorization Act (SARA) in 1986; the Defense Authorization Amendments and Base Realignment and Closure Acts (BRAC) of 1998 and the Defense Base Closure and Realignment Act of 1990; and the Resource Conservation and Recovery Act (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984 (HS WA) including Subtitle C (hazardous waste), Subtitle D (solid waste), Subtitle I (underground storage tanks), and Subtitle J (Medical Waste Tracking Act of 1988).

  18. Taking Closure to the Next Level - 13030

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feist, E.T.

    2013-07-01

    The River Corridor Closure Project (RCCP) is the Hanford Site's first closure project and when it is complete, in 2015, it will have cleaned up 220 mi{sup 2} of contaminated land adjacent to the Columbia River. Washington Closure Hanford (WCH) was selected by the DOE to manage the removal and cleanup of Hanford's nuclear legacy along the River Corridor. Work began in 2005 and is now more than 85% complete with more than 2 years left in the contract. A Closure Team was commissioned in December 2009 and has since issued a closure strategy and a disciplined three-phase approach tomore » transition land parcels to DOE, Richland Operations Office (DOE-RL) as cleanup is completed. This process supports DOE-RL objectives for progressive footprint reduction based on the division of the River Corridor into geographical land parcels. It also allows for incremental area-by-area transition and turnover to the Long-Term Stewardship program. Several important milestones stand between now and the successful end of the RCCP. They include overall funding impacts, working with DOE-RL on new scope additions, meeting regulatory milestones, and maintaining a strong safety performance. (authors)« less

  19. Hanford immobilized low-activity tank waste performance assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, F.M.

    1998-03-26

    The Hanford Immobilized Low-Activity Tank Waste Performance Assessment examines the long-term environmental and human health effects associated with the planned disposal of the vitrified low-level fraction of waste presently contained in Hanford Site tanks. The tank waste is the by-product of separating special nuclear materials from irradiated nuclear fuels over the past 50 years. This waste has been stored in underground single and double-shell tanks. The tank waste is to be retrieved, separated into low and high-activity fractions, and then immobilized by private vendors. The US Department of Energy (DOE) will receive the vitrified waste from private vendors and plansmore » to dispose of the low-activity fraction in the Hanford Site 200 East Area. The high-level fraction will be stored at Hanford until a national repository is approved. This report provides the site-specific long-term environmental information needed by the DOE to issue a Disposal Authorization Statement that would allow the modification of the four existing concrete disposal vaults to provide better access for emplacement of the immobilized low-activity waste (ILAW) containers; filling of the modified vaults with the approximately 5,000 ILAW containers and filler material with the intent to dispose of the containers; construction of the first set of next-generation disposal facilities. The performance assessment activity will continue beyond this assessment. The activity will collect additional data on the geotechnical features of the disposal sites, the disposal facility design and construction, and the long-term performance of the waste. Better estimates of long-term performance will be produced and reviewed on a regular basis. Performance assessments supporting closure of filled facilities will be issued seeking approval of those actions necessary to conclude active disposal facility operations. This report also analyzes the long-term performance of the currently planned disposal system as a basis to set requirements on the waste form and the facility design that will protect the long-term public health and safety and protect the environment.« less

  20. Septic tank burial: not just another skeleton in the closet.

    PubMed

    Lew, E O; Bannach, B; Rodriguez, W C

    1996-09-01

    Backed-up toilets lead to the discovery of a skeleton in the septic tank. Our challenges began with the excavation of this unconventional grave and progressed through recovery and examination of the skeleton, determination of the cause and manner of death, and ultimately, identification of the victim. Main aspects of the septic tank system are summarized, including functional theory, physical design and components, and general comments on use and maintenance. We discuss some basic principles applicable to the excavation and examination of any human skeletal remains, and offer a general approach to identification of the decedent.

  1. Closure Report for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. M. Fitzmaurice

    2001-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Actionmore » Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box, Partial Excavation, and Administrative Controls.'' The corrective action was performed following the NDEP-approved Corrective Action Plan (CAP) (DOE/NV, 2000).« less

  2. The Variable Polarity Plasma Arc Welding Process: Its Application to the Space Shuttle External Tank

    NASA Technical Reports Server (NTRS)

    Nunes, A. C., Jr.; Bayless, E. O., Jr.; Wilson, W. A.

    1984-01-01

    This report describes progress in the implementation of the Variable Polarity Plasma Arc Welding (VPPAW) process at the External Tank (ET) assembly facility. Design allowable data has been developed for thicknesses up to 1.00 in. More than 24,000 in. of welding on liquid oxygen and liquid hydrogen cylinders has been made without an internal defect.

  3. Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. M. Obi

    2000-04-01

    The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action and to provide data confirming the corrective action. The corrective action was performed following the approved Corrective Action Plan (CAP) (U.S. Department of Energy [DOE], 1999b) and consisted of closure-in-place with partial excavation, disposal, backfilling, administrative controls, and post-closure monitoring. Soil with petroleum hydrocarbon concentrations above the Nevada Division of Environmental Protection (NDEP) Action Level of 100 milligrams per kilogram (mg/kg) (Nevada Administrative Code, 1996) was removed to a depth of 1.5 meters (m) (5 feet [ft]). The excavations were backfilled with clean fillmore » to restore the site and to prevent contact with deeper, closed-in-place soil that exceeded the NDEP Action Level. According to the Corrective Action Investigation Plan (CAIP) (DOE, 1998), the Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting and emergency response personnel at the NTS and encompasses an area approximately 85 by 115 m (280 by 380 ft). The location of the Mercury Fire Training Pit is shown in Figure 1 and a site plan is shown in Figure 2. The Mercury Fire Training Pit formerly included a bermed bum pit with four small bum tanks; four large above ground storage tanks (ASTS); an overturned bus, a telephone pole storage area; and several areas for burning sheds, pallets, and cables. During the active life of the Mercury Fire Training Pit, training events were conducted at least monthly and sometimes as often as weekly. Fuels burned during these events included off-specification or rust-contaminated gasoline, diesel, and aviation fuel (JP-4). Other items burned during these events included paint, tires, a pond liner, wood, paper, cloth, and copper cable. Approximately 570 liters (L) (150 gallons [gal]) of fuel were used for each training event resulting in an approximate total of 136,000 L (36,000 gal) of fuel used over the life of the Mercury Fire Training Pit. Unburned fuel was allowed to pool on the ground and was left to eventually volatilize or soak into the soil. In addition, fuels from the ASTS and fuels and fluids from the overturned bus leaked or spilled onto the ground. Approximately 19 L to 38 L (5 to 10 gal) of paint were also burned monthly until sometime in the 1970s.« less

  4. Feasibility study of tank leakage mitigation using subsurface barriers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Treat, R.L.; Peters, B.B.; Cameron, R.J.

    1994-09-21

    The US Department of Energy (DOE) has established the Tank Waste Remediation System (TWRS) to satisfy manage and dispose of the waste currently stored in the underground storage tanks. The retrieval element of TWRS includes a work scope to develop subsurface impermeable barriers beneath SSTs. The barriers could serve as a means to contain leakage that may result from waste retrieval operations and could also support site closure activities by facilitating cleanup. Three types of subsurface barrier systems have emerged for further consideration: (1) chemical grout, (2) freeze walls, and (3) desiccant, represented in this feasibility study as a circulatingmore » air barrier. This report contains analyses of the costs and relative risks associated with combinations retrieval technologies and barrier technologies that from 14 alternatives. Eight of the alternatives include the use of subsurface barriers; the remaining six nonbarrier alternative are included in order to compare the costs, relative risks and other values of retrieval with subsurface barriers. Each alternative includes various combinations of technologies that can impact the risks associated with future contamination of the groundwater beneath the Hanford Site to varying degrees. Other potential risks associated with these alternatives, such as those related to accidents and airborne contamination resulting from retrieval and barrier emplacement operations, are not quantitatively evaluated in this report.« less

  5. High but not dry: diverse epiphytic bromeliad adaptations to exposure within a seasonally dry tropical forest community.

    PubMed

    Reyes-García, C; Mejia-Chang, M; Griffiths, H

    2012-02-01

    • Vascular epiphytes have developed distinct lifeforms to maximize water uptake and storage, particularly when delivered as pulses of precipitation, dewfall or fog. The seasonally dry forest of Chamela, Mexico, has a community of epiphytic bromeliads with Crassulacean acid metabolism showing diverse morphologies and stratification within the canopy. We hypothesize that niche differentiation may be related to the capacity to use fog and dew effectively to perform photosynthesis and to maintain water status. • Four Tillandsia species with either 'tank' or 'atmospheric' lifeforms were studied using seasonal field data and glasshouse experimentation, and compared on the basis of water use, leaf water δ(18) O, photosynthetic and morphological traits. • The atmospheric species, Tillandsia eistetteri, with narrow leaves and the lowest succulence, was restricted to the upper canopy, but displayed the widest range of physiological responses to pulses of precipitation and fog, and was a fog-catching 'nebulophyte'. The other atmospheric species, Tillandsia intermedia, was highly succulent, restricted to the lower canopy and with a narrower range of physiological responses. Both upper canopy tank species relied on tank water and stomatal closure to avoid desiccation. • Niche differentiation was related to capacity for water storage, dependence on fog or dewfall and physiological plasticity. © 2011 The Authors. New Phytologist © 2011 New Phytologist Trust.

  6. Closure of skin incisions by laser-welding with a combination of two near-infrared diode lasers: preliminary study for determination of optimal parameters

    NASA Astrophysics Data System (ADS)

    Hu, Liming; Lu, Zhihua; Wang, Biao; Cao, Junsheng; Ma, Xiaobo; Tian, Zhenhua; Gao, Zhijian; Qin, Li; Wu, Xiaodong; Liu, Yun; Wang, Lijun

    2011-03-01

    Laser welding has the potential to become an effective method for wound closure and healing without sutures. Closure of skin incisions by laser welding with a combination of two near-infrared lasers (980 and 1064 nm), was performed for the first time in this study. One centimeter long, full-thickness incisions were made on the Wistar rat's dorsal skin. The efficiencies of laser-welding with different parameters were investigated. Incision-healing, histology examination, and a tensile strength test of incisions were recorded. Laser welding with the irradiance level of 15.9 W/cm2 for both 980 and 1064-nm lasers and exposure time of 5 s per spot in continuous wave mode yielded a more effective closure and healing with minimal thermal damage, faster recovery, and stronger apposition in comparison with a suturing technique. The conclusion is that skin welding with a combination of two near-infrared diode lasers can be a good candidate for incision closure, and further investigations are in progress for clinical use.

  7. Angle closure glaucoma in congenital ectropion uvea.

    PubMed

    Wang, Grace M; Thuente, Daniel; Bohnsack, Brenda L

    2018-06-01

    Congenital ectropion uvea is a rare anomaly, which is associated with open, but dysplastic iridocorneal angles that cause childhood glaucoma. Herein, we present 3 cases of angle-closure glaucoma in children with congenital ectropion uvea. Three children were initially diagnosed with unilateral glaucoma secondary to congenital ectropion uvea at 7, 8 and 13 years of age. The three cases showed 360° of ectropion uvea and iris stromal atrophy in the affected eye. In one case, we have photographic documentation of progression to complete angle closure, which necessitated placement of a glaucoma drainage device 3 years after combined trabeculotomy and trabeculectomy. The 2 other cases, which presented as complete angle closure, also underwent glaucoma drainage device implantation. All three cases had early glaucoma drainage device encapsulation (within 4 months) and required additional surgery (cycloablation or trabeculectomy). Congenital ectropion uvea can be associated with angle-closure glaucoma, and placement of glaucoma drainage devices in all 3 of our cases showed early failure due to plate encapsulation. Glaucoma in congenital ectropion uvea requires attention to angle configuration and often requires multiple surgeries to obtain intraocular pressure control.

  8. Closure of skin incisions by laser-welding with a combination of two near-infrared diode lasers: preliminary study for determination of optimal parameters.

    PubMed

    Hu, Liming; Lu, Zhihua; Wang, Biao; Cao, Junsheng; Ma, Xiaobo; Tian, Zhenhua; Gao, Zhijian; Qin, Li; Wu, Xiaodong; Liu, Yun; Wang, Lijun

    2011-03-01

    Laser welding has the potential to become an effective method for wound closure and healing without sutures. Closure of skin incisions by laser welding with a combination of two near-infrared lasers (980 and 1064 nm), was performed for the first time in this study. One centimeter long, full-thickness incisions were made on the Wistar rat's dorsal skin. The efficiencies of laser-welding with different parameters were investigated. Incision-healing, histology examination, and a tensile strength test of incisions were recorded. Laser welding with the irradiance level of 15.9 W∕cm(2) for both 980 and 1064-nm lasers and exposure time of 5 s per spot in continuous wave mode yielded a more effective closure and healing with minimal thermal damage, faster recovery, and stronger apposition in comparison with a suturing technique. The conclusion is that skin welding with a combination of two near-infrared diode lasers can be a good candidate for incision closure, and further investigations are in progress for clinical use.

  9. Valve for controlling solids flow

    DOEpatents

    Feldman, David K.

    1980-01-01

    A fluidized solids control valve is disclosed that is particularly well adapted for use with a flow of coal or char that includes both large particles and fines. The particles may or may not be fluidized at various times during the operation. The valve includes a tubular body that terminates in a valve seat covered by a normally closed closure plate. The valve body at the seat and the closure plate is provided with aligned longitudinal slots that receive a pivotally supported key plate. The key plate is positionable by an operator in inserted, intermediate and retracted positions respecting the longitudinal slot in the valve body. The key plate normally closes the slot within the closure plate but is shaped and aligned obliquely to the longitudinal slot within the valve body to provide progressively increasing slot openings between the inserted and retracted positions. Transfer members are provided between the operator, key plate and closure plate to move the closure plate into an open position only when the key plate is retracted from the longitudinal slot within the valve body.

  10. Summary Analysis: Hanford Site Composite Analysis Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nichols, W. E.; Lehman, L. L.

    2017-06-05

    The Hanford Site’s currently maintained Composite Analysis, originally completed in 1998, requires an update. A previous update effort was undertaken by the U.S. Department of Energy (DOE) in 2001-2005, but was ended before completion to allow the Tank Closure & Waste Management Environmental Impact Statement (TC&WM EIS) (DOE/EIS-0391) to be prepared without potential for conflicting sitewide models. This EIS was issued in 2012, and the deferral was ended with guidance in memorandum “Modeling to Support Regulatory Decision Making at Hanford” (Williams, 2012) provided with the aim of ensuring subsequent modeling is consistent with the EIS.

  11. Determining the release of radionuclides from tank waste residual solids. FY2015 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, William D.; Hobbs, David T.

    Methodology development for pore water leaching studies has been continued to support Savannah River Site High Level Waste tank closure efforts. For FY2015, the primary goal of this testing was the achievement of target pH and Eh values for pore water solutions representative of local groundwater in the presence of grout or grout-representative (CaCO 3 or FeS) solids as well as waste surrogate solids representative of residual solids expected to be present in a closed tank. For oxidizing conditions representative of a closed tank after aging, a focus was placed on using solid phases believed to be controlling pH andmore » E h at equilibrium conditions. For three pore water conditions (shown below), the target pH values were achieved to within 0.5 pH units. Tank 18 residual surrogate solids leaching studies were conducted over an E h range of approximately 630 mV. Significantly higher Eh values were achieved for the oxidizing conditions (ORII and ORIII) than were previously observed. For the ORII condition, the target Eh value was nearly achieved (within 50 mV). However, E h values observed for the ORIII condition were approximately 160 mV less positive than the target. E h values observed for the RRII condition were approximately 370 mV less negative than the target. Achievement of more positive and more negative E h values is believed to require the addition of non-representative oxidants and reductants, respectively. Plutonium and uranium concentrations measured during Tank 18 residual surrogate solids leaching studies under these conditions (shown below) followed the general trends predicted for plutonium and uranium oxide phases, assuming equilibrium with dissolved oxygen. The highest plutonium and uranium concentrations were observed for the ORIII condition and the lowest concentrations were observed for the RRII condition. Based on these results, it is recommended that these test methodologies be used to conduct leaching studies with actual Tank 18 residual solids material. Actual waste testing will include leaching evaluations of technetium and neptunium, as well as plutonium and uranium.« less

  12. Progress of the Enhanced Hanford Single Shell Tank (SST) Integrity Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Venetz, Theodore J.; Washenfelder, Dennis J.; Boomer, Kayle D.

    2015-01-07

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Changemore » Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement.« less

  13. 4. CONSTRUCTION PROGRESS VIEW OF EQUIPMENT IN FRONT PART OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. CONSTRUCTION PROGRESS VIEW OF EQUIPMENT IN FRONT PART OF CONTROL BUNKER (TRANSFORMER, HYDRAULIC TANK, PUMP, MOTOR). SHOWS UNLINED CORRUGATED METAL WALL. CAMERA FACING EAST. INEL PHOTO NUMBER 65-5433, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  14. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document.more » The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.« less

  15. Patent foramen ovale closure and migraine: science and sensibility.

    PubMed

    Gupta, Vinod Kumar

    2010-09-01

    Migraine has been associated with patent foramen ovale (PFO), and PFO closure has become the most high-profile nonpharmacologic invasive therapy recommended for the prevention of recurrent migraine attacks, as well as for preventing further attacks in cryptogenic stroke. The results of Migraine Intervention with STARFlex Technology (MIST), a controversial but important recent randomized clinical trial (RCT) of PFO closure for migraine, do not support PFO closure for preventing migraine attacks. All patients with migraine, however, do not have a PFO, and the characteristic periodicity and predictability of migraine cannot be explained on the basis of paradoxical embolism through the PFO. Closure of the PFO or atrial septal defect can aggravate migraine suddenly. PFO increases in size with age, but migraine generally subsides with the passage of years. Serendipity does play a role in some medical discoveries, but in the absence of a logically defensible theoretical basis, chance and statistics can both become misleading. With soft end points, RCTs in migraine patients can generate conflicting and irreconcilable data. RCTs cannot supplant or substitute clinical common sense or justify serendipity. Scientific progress mandates that any serendipitous research must ultimately conform to the principles of the basic sciences surrounding the chance discovery. PFO closure for preventing migraine attacks is an unfortunate, but sobering, chapter in the migraine research saga.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leishear, R.; Thaxton, D.; Minichan, R.

    A sampling tool was required to evaluate residual activity ({mu}Curies per square foot) on the inner wall surfaces of underground nuclear waste storage tanks. The tool was required to collect a small sample from the 3/8 inch thick tank walls. This paper documents the design, testing, and deployment of the remotely operated sampling device. The sampler provides material from a known surface area to estimate the overall surface contamination in the tank prior to closure. The sampler consisted of a sampler and mast assembly mast assembly, control system, and the sampler, or end effector, which is defined as the operatingmore » component of a robotic arm. The mast assembly consisted of a vertical 30 feet long, 3 inch by 3 inch, vertical steel mast and a cantilevered arm hinged at the bottom of the mast and lowered by cable to align the attached sampler to the wall. The sampler and mast assembly were raised and lowered through an opening in the tank tops, called a riser. The sampler is constructed of a mounting plate, a drill, springs to provide a drive force to the drill, a removable sampler head to collect the sample, a vacuum pump to draw the sample from the drill to a filter, and controls to operate the system. Once the sampler was positioned near the wall, electromagnets attached it to the wall, and the control system was operated to turn on the drill and vacuum to remove and collect a sample from the wall. Samples were collected on filters in removable sampler heads, which were readily transported for further laboratory testing.« less

  17. Hypervitaminosis A-induced premature closure of epiphyses (physeal obliteration) in humans and calves (hyena disease): a historical review of the human and veterinary literature.

    PubMed

    Rothenberg, Alexis B; Berdon, Walter E; Woodard, J Carroll; Cowles, Robert A

    2007-12-01

    Vitamin A toxicity in the infant, which now occurs rarely from dietary overdosage, was recognized in the 1940s as painful periostitis with rare progression to premature closure of the lower limb epiphyses. Decades later, most cases of vitamin A-induced premature epiphyseal closure (physeal obliteration) occur in pediatric dermatologic patients given vitamin A analogues. This phenomenon resembles a strange disease discovered in more recent years in calves with closed epiphyses of the hind limbs, known as hyena disease. This was a mystery until proved to be caused by vitamin A toxicity from enriched grain that causes the calves to have short hind limbs that resemble those of a hyena and gait disturbance. This historical review links the human and veterinary literature in terms of vitamin A-induced epiphyseal closure using a case report format of a 16-month-old human infant with closed knee epiphyses and gait disturbance that is reminiscent of hyena disease seen in calves.

  18. Corrective Action Decision Document for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-05-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, at the Nevada Test Site, Nevada, according to the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 151 is comprised of eight corrective action sites (CASs): (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). The purpose of this Corrective Action Decision Document ismore » to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for each of the eight CASs within CAU 151. Corrective action investigation (CAI) activities were performed from September 12 through November 18, 2005, as set forth in the CAU 151 Corrective Action Investigation Plan and Record of Technical Change No. 1. Additional confirmation sampling was performed on December 9, 2005; January 10, 2006; and February 13, 2006. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern for each CAS. The results of the CAI identified contaminants of concern at two of the eight CASs in CAU 151 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 151 revealed the following: (1) Soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 12-47-01, 18-03-01, 18-99-09, and Lagoons B through G of CAS 12-03-01 do not contain contamination at concentrations exceeding the FALs. (2) Lagoon A of CAS 12-03-01 has arsenic above FALs in shallow subsurface soils. (3) One of the two tanks of CAS 12-04-01, System No.1, has polychlorinated biphenyls (aroclor-1254), trichloroethane, and cesium-137 above FALs in the sludge. Both CAS 12-04-01, System No.1 tanks contain trichloroethane and 1,4-dichlorobenzene above ''Resource Conservation and Recovery Act'' toxicity characteristic limits. Based on the evaluation of analytical data from the CAI, review of future and current operations at the eight CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 151. No Further Action is the recommended corrective action for soils at CASs 02-05-01, 12-04-01, 12-04-02, 12-04-03, 18-03-01, and 18-99-09; and Lagoons C, D, F, and G of CAS 12-03-01. No Further Action with implementation of a best management practice (BMP) is recommended for soils at CAS 12-47-01 and Lagoons B and E of CAS 12-03-01. To be protective of future workers should the present scenario used to calculate FALs change, an administrative use restriction will be recorded per the FFACO agreement as a BMP. Close in Place with Administrative Controls is the recommended corrective action for Lagoon A of CAS 12-03-01. Based on the evaluation of analytical data from the CAI; review of future and current operations at CASs 12-04-01, 12-04-02, and 12-04-03; and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for the septic tanks at these CASs. No Further Action with implementation of BMPs is the recommended corrective action for septic tanks that do not contain potential source material from CAS 12-04-01, System No.4 (four tanks); CAS 12-04-02, System No.5 (six tanks); and CAS 12-04-03, System No.3 (four tanks). Clean Closure with implementation of BMPs is the recommended corrective action for the septic tanks from CAS 12-04-01, System No.1 (two tanks). The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 151.« less

  19. Floating Node Method and Virtual Crack Closure Technique for Modeling Matrix Cracking-Delamination Interaction

    NASA Technical Reports Server (NTRS)

    DeCarvalho, N. V.; Chen, B. Y.; Pinho, S. T.; Baiz, P. M.; Ratcliffe, J. G.; Tay, T. E.

    2013-01-01

    A novel approach is proposed for high-fidelity modeling of progressive damage and failure in composite materials that combines the Floating Node Method (FNM) and the Virtual Crack Closure Technique (VCCT) to represent multiple interacting failure mechanisms in a mesh-independent fashion. In this study, the approach is applied to the modeling of delamination migration in cross-ply tape laminates. Delamination, matrix cracking, and migration are all modeled using fracture mechanics based failure and migration criteria. The methodology proposed shows very good qualitative and quantitative agreement with experiments.

  20. Floating Node Method and Virtual Crack Closure Technique for Modeling Matrix Cracking-Delamination Migration

    NASA Technical Reports Server (NTRS)

    DeCarvalho, Nelson V.; Chen, B. Y.; Pinho, Silvestre T.; Baiz, P. M.; Ratcliffe, James G.; Tay, T. E.

    2013-01-01

    A novel approach is proposed for high-fidelity modeling of progressive damage and failure in composite materials that combines the Floating Node Method (FNM) and the Virtual Crack Closure Technique (VCCT) to represent multiple interacting failure mechanisms in a mesh-independent fashion. In this study, the approach is applied to the modeling of delamination migration in cross-ply tape laminates. Delamination, matrix cracking, and migration are all modeled using fracture mechanics based failure and migration criteria. The methodology proposed shows very good qualitative and quantitative agreement with experiments.

  1. Model Experiment on the Temporary Closure of a Breached Bank

    NASA Astrophysics Data System (ADS)

    Shimada, T.; Maeda, S.; Nakashima, Y.

    2016-12-01

    In recent years, the possibility of river bank failures has been rising due to increased occurrences of floods from localized torrential downpours and typhoons. To mitigate bank failure damage, we made an experiment to simulate the flood discharge reduction effect of a temporary closure at an opening in a breached bank. A scale river model was used. A bank was made and then breached. Then, model blocks were placed to close the breach, to observe the flood discharge reduction afforded by the closure. We assumed that the blocks would be placed by a crane or from a helicopter, so we placed the model blocks accordingly. Regardless of the placement method, the flood discharge reduction was about 20% when about 50% of the breach was closed by the placement of blocks starting from the upstream-most portion of the breach. That result was because the water flow hit the tip of the placed closure, scoured the bed near the tip, and lowered the bed at the remaining part of the breach opening, after which the area where water flows out did not decrease at the same rate as the rate of longitudinal closure for the breach. In addition, with each successive length of breach closure, the required number of blocks increased and the closure progress decreased, because of the bed degradation. The results show that it is possible to reduce the flood flow from a bank breach effectively while closing the opening by taking measures to reduce bed scouring near the breach.

  2. Staged depressurization system

    DOEpatents

    Schulz, T.L.

    1993-11-02

    A nuclear reactor having a reactor vessel disposed in a containment shell is depressurized in stages using depressurizer valves coupled in fluid communication with the coolant circuit. At least one sparger submerged in the in-containment refueling water storage tank which can be drained into the containment sump communicates between one or more of the valves and an inside of the containment shell. The depressurizer valves are opened in stages, preferably at progressively lower coolant levels and for opening progressively larger flowpaths to effect depressurization through a number of the valves in parallel. The valves can be associated with a pressurizer tank in the containment shell, coupled to a coolant outlet of the reactor. At least one depressurization valve stage openable at a lowest pressure is coupled directly between the coolant circuit and the containment shell. The reactor is disposed in the open sump in the containment shell, and a further valve couples the open sump to a conduit coupling the refueling water storage tank to the coolant circuit for adding water to the coolant circuit, whereby water in the containment shell can be added to the reactor from the open sump. 4 figures.

  3. Staged depressurization system

    DOEpatents

    Schulz, Terry L.

    1993-01-01

    A nuclear reactor having a reactor vessel disposed in a containment shell is depressurized in stages using depressurizer valves coupled in fluid communication with the coolant circuit. At least one sparger submerged in the in-containment refueling water storage tank which can be drained into the containment sump communicates between one or more of the valves and an inside of the containment shell. The depressurizer valves are opened in stages, preferably at progressively lower coolant levels and for opening progressively larger flowpaths to effect depressurization through a number of the valves in parallel. The valves can be associated with a pressurizer tank in the containment shell, coupled to a coolant outlet of the reactor. At least one depressurization valve stage openable at a lowest pressure is coupled directly between the coolant circuit and the containment shell. The reactor is disposed in the open sump in the containment shell, and a further valve couples the open sump to a conduit coupling the refueling water storage tank to the coolant circuit for adding water to the coolant circuit, whereby water in the containment shell can be added to the reactor from the open sump.

  4. The visual and radiological inspection of a pipeline using a teleoperated pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogle, R.F.; Kuelske, K.; Kellner, R.A.

    1996-07-01

    In the 1950s the Savannah River Site built an open, unlined retention basin for temporary storage of potentially radionuclide-contaminated cooling water form a chemical separations process and storm water drainage from a nearby waste management facility which stored large quantities of nuclear fission by-products in carbon steel tanks. An underground process pipeline lead to the basin. Once the closure of the basin in 1972, further assessment has been required. A visual and radiological inspection of the pipeline was necessary to aid in the decision about further remediation. This article describes the inspection using a teleoperated pipe crawler. 5 figs.

  5. Temporal Progression of Visual Injury from Blast Exposure

    DTIC Science & Technology

    2013-09-01

    included the design and construction of a silencer and dump tank. The final design is shown in Figure 8. A steel barrel lined with 2” of acoustic foam...was selected as the dump tank. It surrounds a rubber barrel lined with foam composite. The steel barrel is allowed to recoil on a cart, absorbing...test. Figure 8. (Left) Inner silencer assembly completed during Q4 of Year 1. (Right) Final silencer assembly with the outer steel drum

  6. Corrective Action Decision Document/Closure Report for Corrective Action Unit 274: Septic Systems, Nevada Test Site, Nevada, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    2006-09-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated based on the occasional use scenario. Benzo(a)pyrene was detected above the preliminary action level at CAS 20-05-01; however, it was not identified as a COC because the concentration was below the FAL. As a best management practice and to ensure that future site workers are not exposed to this site contaminant for more than this decision-basis exposure duration, an administrative use restriction was established around the leachfield at CAS 20-05-01. In addition, the removal of the septic tanks and septic tank contents at CASs 03-02-01, 06-02-01, and 20-05-01 was performed.« less

  7. Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviewsmore » the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.« less

  8. Demonstration of anaerobic stabilization of black water in accumulation systems under tropical conditions.

    PubMed

    Chaggu, Esnati J; Sanders, Wendy; Lettinga, Gatze

    2007-11-01

    The anaerobic digestion of "human waste" was studied at Mlalakuwa residential settlement in Dar-es-Salaam, Tanzania at ambient tropical temperatures (24-31 degrees C). This settlement experiences a high water table with flooding during the rainy season, resulting in a very costly emptying of the latrines once per month. To improve the situation, two plastic tanks (while one is in use, the other one is on stand-by) of 3000 l capacity each, named as Improved Pit-Latrines Without Urine Separation (IMPLWUS), were used as latrine pits. They received faeces+urine+wash water; basically, an accumulation system. Septic tank seed sludge was used. The dissolved chemical oxygen demand (COD(dis)) remaining when the reactor was closed after 380 days was about 8 g COD/l, volatile fatty acids were 100 mg COD/l and total ammonium nitrogen was about 2.8 g N/l, implying the possibility of methanogenesis inhibition. Stability results indicated a need for more degradation time after reactor closure. Estimated biogas production from wastewater generated by 10 people was 544 g COD-CH(4)/day, not enough for cooking purposes.

  9. SECONDARY WASTE MANAGEMENT FOR HANFORD EARLY LOW ACTIVITY WASTE VITRIFICATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    UNTERREINER BJ

    2008-07-18

    More than 200 million liters (53 million gallons) of highly radioactive and hazardous waste is stored at the U.S. Department of Energy's Hanford Site in southeastern Washington State. The DOE's Hanford Site River Protection Project (RPP) mission includes tank waste retrieval, waste treatment, waste disposal, and tank farms closure activities. This mission will largely be accomplished by the construction and operation of three large treatment facilities at the Waste Treatment and Immobilization Plant (WTP): (1) a Pretreatment (PT) facility intended to separate the tank waste into High Level Waste (HLW) and Low Activity Waste (LAW); (2) a HLW vitrification facilitymore » intended to immobilize the HLW for disposal at a geologic repository in Yucca Mountain; and (3) a LAW vitrification facility intended to immobilize the LAW for shallow land burial at Hanford's Integrated Disposal Facility (IDF). The LAW facility is on target to be completed in 2014, five years prior to the completion of the rest of the WTP. In order to gain experience in the operation of the LAW vitrification facility, accelerate retrieval from single-shell tank (SST) farms, and hasten the completion of the LAW immobilization, it has been proposed to begin treatment of the low-activity waste five years before the conclusion of the WTP's construction. A challenge with this strategy is that the stream containing the LAW vitrification facility off-gas treatment condensates will not have the option of recycling back to pretreatment, and will instead be treated by the Hanford Effluent Treatment Facility (ETF). Here the off-gas condensates will be immobilized into a secondary waste form; ETF solid waste.« less

  10. AGOR 28: SIO Shipyard Representative Bi-Weekly Progress Report

    DTIC Science & Technology

    2013-07-18

    ADA DBL)/ADA t/s  Lkr Md-2 (CG) 6  Sally Ride Gray Water Tank – Tank pressurized and boundaries inspected for leaks with ABS in...SPARES (VRS) LISTINGS, STATISTICS, AND LOCATIONS (DI-051 (VRS) for Pl 72428-03 Gray Water Discharge Pump)(R/ASR) 570/0 AGOR27 A051 STD Report...VENDOR RECOMMENDED SPARES (VRS) LISTINGS, STATISTICS, AND LOCATIONS ( DI-051 (VRS) for PL 72428-08 Hot Water Circ Pump)(R/ASR) 574/0 AGOR27 A055 TM

  11. Implementation of an Outer Can Welding System for Savannah River Site FB-Line

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard, S.R.

    2003-03-27

    This paper details three phases of testing to confirm use of a Gas Tungsten Arc (GTA) system for closure welding the 3013 outer container used for stabilization/storage of plutonium metals and oxides. The outer container/lid closure joint was originally designed for laser welding, but for this application, the gas tungsten arc (GTA) welding process has been adapted. The testing progressed in three phases: (1) system checkout to evaluate system components for operational readiness, (2) troubleshooting to evaluate high weld failure rates and develop corrective techniques, and (3) pre-installation acceptance testing.

  12. Evaluation of Aquaponics Techniques for Enhancing Productivity and Degree of Closure of Bioregenerative Life Support Systems (BLSS)

    NASA Astrophysics Data System (ADS)

    Nelson, Mark; Dempster, William; Highfield, Eric

    A number of researchers in space bioregenerative life support systems (BLSS) have advocated the inclusion of fish-rearing. Fish have relatively high feed to production ratios and can utilize some waste products from other system components. In recent years, there has been much advance in an approach to combining fish-culture with hydroponically-grown crops called “aquaponics”. Aquaponics systems vary but generally include: fish-rearing unit, settling basin, biofilter, hydroponic plant unit and sump where water is pumped back and the cycle continues. Aquaponics research and application has grown since these systems have the potential to increase overall productivity of both crops and fish. Since the fish waste is used as the growth medium of the food plants, there are environmental benefits in reduced discharge of nutrient-rich wastewater which has been one of the drawbacks of conventional aquaculture. In addition, since water use is reduced 95+% over field agriculture, since water from the hydroponic tanks is fed back to the fish tanks and water is recycled apart from evapotranspiration losses, conservation of water resources and applications in water-limited arid regions are other benefits fueling the spread of aquaponics around the world. These considerations also make utilization of aquaponic approaches desirable in BLSS for space application. This paper will examine some recent research results with aquaponics and explore how it might be utilized for food production and reduction of consumables in space life support. In addition, a review and comparison with other fish-culture options previously advanced will evaluate whether aquaponics can improve production efficiency, reduce inputs and better recycle critical resources. Finally, we will explore whether for the space environment, even more advanced aquaponics systems are possible where consumables such as fish-food can be partially or completely supplied from other subsystems of the BLSS and ET water losses compensated by condensation from humidity in the atmosphere. For longer term space life support, the paper will evaluate how aquaponics might integrate soil-like-substrate made from inedible crop biomass, utilize algae (edible) for water quality improvement in the fish tanks and how any wastes might be more fully integrated in other BLSS subsystems to improve overall closure ratio.

  13. [Non-invasive assessment of the perfusion of wounds using power Doppler imaging: vacuum assisted closure versus direct wound closure].

    PubMed

    Jungius, K P; Chilla, B K; Labler, L; Teodorovic, N; Marincek, B

    2006-10-01

    The goal of our study was to assess the perfusion in wounds treated by vacuum assisted closure (VAC) compared to primary wound closure. Power Doppler Ultrasound (PDUS) was carried out under standardised conditions in 15 VAC-treated and 10 primarily closed wounds as well as on altogether 25 intraindividual reference areas. All data were sent to a work station for post-processing to determine the perfused area. Statistical data analysis was performed with the Mann-Whitney test. Both VAC-treated wounds and primarily closed wounds showed a significant increase of the perfusion when compared to the intraindividual reference area (p < 0.0001). In VAC-treated wounds, a markedly increased perfusion was measured compared to the wounds closed primarily (p < 0.0001). Perfusion decreased during treatment, but in two VAC-treated wounds, an initial increase of the perfusion was observed. Both these wounds were grossly infected. PDUS allows the quantification of the differences in wound perfusion. This can be helpful in the detection of progressive local wound infections.

  14. 71. ARAII. Construction progress at SL1 site near end of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    71. ARA-II. Construction progress at SL-1 site near end of 1957. Buildings from right to left are guard house, support building, reactor building, water tank and pump house. Construction was 23 percent complete. December 20, 1957. Ineel photo no. 57-6224. Photographer: Jack L. Anderson. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  15. Developing NDE Techniques for Large Cryogenic Tanks - Year 2 Report

    NASA Technical Reports Server (NTRS)

    Arens, Ellen; youngquist, Robert; McFall, Judith; Simmons, Stephen

    2010-01-01

    The Shuttle Program requires very large cryogenic ground storage tanks in which to store liquid oxygen and hydrogen. The existing Launch Complex-39 Pad tanks, which will be passed onto future launch programs, are over 40 years old and have received minimal refurbishment and only external inspections over the years. The majority of the structure is inaccessible without a full system drain of cryogenic liquid and insulation in the annular region. It was previously thought that there was a limit to the number of temperature cycles that the tanks could handle due to possible insulation compaction before undergoing a costly and time consuming complete overhaul; therefore the tanks were not drained and performance issues with these tanks, specifically the Pad B LH2 tank, were accepted. There is a need and an opportunity, as the Shuttle program ends and work to upgrade the launch pad progresses, to develop innovative non-destructive evaluation (NDE) techniques to analyze the current tanks. Techniques are desired that can aid in determining the extent of refurbishment required to keep the tanks in service for another 20+ years. A non-destructive technique would also be a significant aid in acceptance testing of new and refurbished tanks, saving significant time and money, if corrective actions can be taken before cryogen is introduced to the systems. Year one of this project concentrated on analysis of the current tanks located at LC-39 while cryogen was present. Year two of this project concentrated on analysis of detectable thermal variations on the outer surface of the tanks as the cryogen was drained and the inner vessel warmed to ambient conditions. Two techniques have been deployed in the field to monitor the tank. The first consisted of a displacement sensor to monitor for any expansions at the base of the tank during warm-up that could indicate a compaction issue with the insulation. The second technique was continued thermal monitoring of the tank through and after warm up. The indications noted in the thermal images were compared to bore-scope images of the annular region taken once the tank was inert and warmed to ambient conditions. Similar thermal imaging was performed on a smaller tank where an insulation void was induced to compare the effectiveness of thermal imagining on a different tank geometry.

  16. Closure of population biobanks and direct-to-consumer genetic testing companies.

    PubMed

    Zawati, Ma'n H; Borry, Pascal; Howard, Heidi Carmen

    2011-09-01

    Genetic research gained new momentum with the completion of the Human Genome Project in 2003. Formerly centered on the investigation of single-gene disorders, genetic research is increasingly targeting common complex diseases and in doing so is studying the whole genome, the environment and its impact on genomic variation. Consequently, biobanking initiatives have emerged around the world as a tool to sustain such progress. Whether they are small scale or longitudinal, public or private, commercial or non-commercial, biobanks should consider the possibility of closure. Interestingly, while raising important ethical issues, this topic has hardly been explored in the literature. Indeed, ethical issues associated with sale, insolvency, end of funding, or transfer of materials to other entities (which are all issues either related to or possible consequences of closure) are seldom the subject of discussion. In an attempt to fill this gap, this paper will discuss-using population and direct-to-consumer (DTC) genetic testing companies' biobanks as case studies-(1) international and national normative documents addressing the issue of closure and (2) the internal policies of population biobanks and DTC genetic testing companies. The analysis will inform the debate on biobank closure and elucidate the underlying ethical issues, which include, but are not limited to informed consent, storage and privacy.

  17. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada with Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    2002-11-12

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in the SAFER Plan. In addition, the septic tank associated with CAU 356 will be closed in accordance with applicable regulations.« less

  18. Integrated Design and Engineering Analysis (IDEA) Environment - Propulsion Related Module Development and Vehicle Integration

    NASA Technical Reports Server (NTRS)

    Kamhawi, Hilmi N.

    2013-01-01

    This report documents the work performed during the period from May 2011 - October 2012 on the Integrated Design and Engineering Analysis (IDEA) environment. IDEA is a collaborative environment based on an object-oriented, multidisciplinary, distributed framework using the Adaptive Modeling Language (AML). This report will focus on describing the work done in the areas of: (1) Integrating propulsion data (turbines, rockets, and scramjets) in the system, and using the data to perform trajectory analysis; (2) Developing a parametric packaging strategy for a hypersonic air breathing vehicles allowing for tank resizing when multiple fuels and/or oxidizer are part of the configuration; and (3) Vehicle scaling and closure strategies.

  19. Progress and future direction for the interim safe storage and disposal of Hanford high-level waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less

  20. Energy-Based Tissue Fusion for Sutureless Closure: Applications, Mechanisms, and Potential for Functional Recovery.

    PubMed

    Kramer, Eric A; Rentschler, Mark E

    2018-06-04

    As minimally invasive surgical techniques progress, the demand for efficient, reliable methods for vascular ligation and tissue closure becomes pronounced. The surgical advantages of energy-based vessel sealing exceed those of traditional, compression-based ligatures in procedures sensitive to duration, foreign bodies, and recovery time alike. Although the use of energy-based devices to seal or transect vasculature and connective tissue bundles is widespread, the breadth of heating strategies and energy dosimetry used across devices underscores an uncertainty as to the molecular nature of the sealing mechanism and induced tissue effect. Furthermore, energy-based techniques exhibit promise for the closure and functional repair of soft and connective tissues in the nervous, enteral, and dermal tissue domains. A constitutive theory of molecular bonding forces that arise in response to supraphysiological temperatures is required in order to optimize and progress the use of energy-based tissue fusion. While rapid tissue bonding has been suggested to arise from dehydration, dipole interactions, molecular cross-links, or the coagulation of cellular proteins, long-term functional tissue repair across fusion boundaries requires that the reaction to thermal damage be tailored to catalyze the onset of biological healing and remodeling. In this review, we compile and contrast findings from published thermal fusion research in an effort to encourage a molecular approach to characterization of the prevalent and promising energy-based tissue bond.

  1. Performance Characterization of the Free Molecule Micro-Resistojet Utilizing Water Propellant (Postprint)

    DTIC Science & Technology

    2007-07-01

    Micci and A. Ketsdever, AIAA Progress in Astronautics and Aeronautics, Vol 187, pp. 45-137, 2000. 3. Janson, S., Helvajian , H ., Hansen, W., and...the radius of the propellant tank. The volume of the empty portion of a spherical propellant tank is given by ( )2 21 33e e t eV h r hπ= + (1...Where the resulting height of the propellant is 2p t eh r h = − (2) A correlation between p t h r and w m M is found in ref. 10. For the

  2. Progressive dysphagia in an elderly male.

    PubMed

    Chen, Po-Shao; Ju, Da-Tong; Lee, Jih-Chin

    2011-11-01

    Dysphagia can result from a variety of causes, including central nervous and peripheral nervous system, myogenic, and structural disorders. A 76-year-old man underwent anterior cervical disketomy and fusion 10 years ago, with progressive dysphagia noted 2 years ago. Endoscopy showed an oropharyngeal tumor, and lateral plain film evaluation of the neck revealed a cervical plate extrusion. Removal of the instrumentation and tumor with primary closure of the pharyngeal perforation was performed, and dysphagia was resolved postoperatively. We report the case of an unusual presentation in the pharynx. We should not neglect this rare diagnosis, because it can progress to a life-threatening outcome.

  3. Corrosion probe. Innovative technology summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Over 253 million liters of high-level waste (HLW) generated from plutonium production is stored in mild steel tanks at the Department of Energy (DOE) Hanford Site. Corrosion monitoring of double-shell storage tanks (DSTs) is currently performed at Hanford using a combination of process knowledge and tank waste sampling and analysis. Available technologies for corrosion monitoring have progressed to a point where it is feasible to monitor and control corrosion by on-line monitoring of the corrosion process and direct addition of corrosion inhibitors. The electrochemical noise (EN) technique deploys EN-based corrosion monitoring probes into storage tanks. This system is specifically designedmore » to measure corrosion rates and detect changes in waste chemistry that trigger the onset of pitting and cracking. These on-line probes can determine whether additional corrosion inhibitor is required and, if so, provide information on an effective end point to the corrosion inhibitor addition procedure. This report describes the technology, its performance, its application, costs, regulatory and policy issues, and lessons learned.« less

  4. Spectral mass gauging of unsettled liquid with acoustic waves

    NASA Astrophysics Data System (ADS)

    Feller, Jeffrey; Kashani, Ali; Khasin, Michael; Muratov, Cyrill; Osipov, Viatcheslav; Sharma, Surendra

    2017-12-01

    Propellant mass gauging is one of the key technologies required to enable the next step in NASA’s space exploration program. At present, there is no reliable method to accurately measure the amount of unsettled liquid propellant in a large-scale propellant tank in micro- or zero gravity. Recently we proposed a new approach to use sound waves to probe the resonance frequencies of the two-phase liquid-gas mixture and take advantage of the mathematical properties of the high frequency spectral asymptotics to determine the volume fraction of the tank filled with liquid. We report the current progress in exploring the feasibility of this approach in the case of large propellant tanks, both experimental and theoretical. Excitation and detection procedures using solenoids for excitation and both hydrophones and accelerometers for detection have been developed. A 3% uncertainty for mass-gauging was demonstrated for a 200-liter tank partially filled with liquid for various unsettled configurations, such as tilts and artificial ullages.

  5. KSC-2010-4799

    NASA Image and Video Library

    2010-09-20

    NEW ORLEANS -- Workers watch the progress of the Space Shuttle Program's last external fuel tank, ET-122, at NASA's Michoud Assembly Facility in New Orleans, as it is being loaded onto the Pegasus Barge. The tank will travel 900 miles by sea to NASA's Kennedy Space Center in Florida secured aboard the barge, offloaded and moved to Kennedy's Vehicle Assembly Building where it will be integrated to space shuttle Endeavour for the STS-134 mission to the International Space Station. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. STS-134, targeted to launch Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  6. KSC-2010-4801

    NASA Image and Video Library

    2010-09-20

    NEW ORLEANS -- Workers check the progress of the Space Shuttle Program's last external fuel tank, ET-122, at NASA's Michoud Assembly Facility in New Orleans as it is being loaded onto the Pegasus Barge. The tank will travel 900 miles by sea to NASA's Kennedy Space Center in Florida secured aboard the barge, offloaded and moved to Kennedy's Vehicle Assembly Building where it will be integrated to space shuttle Endeavour for the STS-134 mission to the International Space Station The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. STS-134, targeted to launch Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  7. KSC-2010-4798

    NASA Image and Video Library

    2010-09-20

    NEW ORLEANS -- Workers monitor the progress of the Space Shuttle Program's last external fuel tank, ET-122, from NASA's Michoud Assembly Facility in New Orleans as it is being loaded onto the Pegasus Barge. The tank will travel 900 miles by sea to NASA's Kennedy Space Center in Florida secured aboard the barge, offloaded and moved to Kennedy's Vehicle Assembly Building where it will be integrated to space shuttle Endeavour for the STS-134 mission to the International Space Station. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. STS-134, targeted to launch Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  8. KSC-2010-4800

    NASA Image and Video Library

    2010-09-20

    NEW ORLEANS -- Workers monitor the progress of the Space Shuttle Program's last external fuel tank, ET-122, at NASA's Michoud Assembly Facility in New Orleans as it is being loaded onto the Pegasus BargeThe tank will travel 900 miles by sea to NASA's Kennedy Space Center in Florida secured aboard the barge, offloaded and moved to Kennedy's Vehicle Assembly Building where it will be integrated to space shuttle Endeavour for the STS-134 mission to the International Space Station. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. STS-134, targeted to launch Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  9. The reconstructive microsurgery ladder in orthopaedics.

    PubMed

    Tintle, Scott M; Levin, L Scott

    2013-03-01

    Since the advent of the operating microscope by Julius Jacobson in 1960, reconstructive microsurgery has become an integral part of extremity reconstruction and orthopaedics. During World War I, with the influx of severe extremity trauma Harold Gillies introduced the concept of the reconstructive ladder for wound closure. The concept of the reconstructive ladder goes from simple to complex means of attaining wound closure. Over the last half century microsurgery has continued to evolve and progress. We now have a microsurgical reconstructive ladder. The microsurgical reconstruction ladder is based upon the early work on revascularization and replantation extending through the procedures that are described in this article. Copyright © 2013. Published by Elsevier Ltd.

  10. Severe Accident Sequence Analysis Program: Anticipated transient without scram simulations for Browns Ferry Nuclear Plant Unit 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallman, R J; Gottula, R C; Holcomb, E E

    1987-05-01

    An analysis of five anticipated transients without scram (ATWS) was conducted at the Idaho National Engineering Laboratory (INEL). The five detailed deterministic simulations of postulated ATWS sequences were initiated from a main steamline isolation valve (MSIV) closure. The subject of the analysis was the Browns Ferry Nuclear Plant Unit 1, a boiling water reactor (BWR) of the BWR/4 product line with a Mark I containment. The simulations yielded insights to the possible consequences resulting from a MSIV closure ATWS. An evaluation of the effects of plant safety systems and operator actions on accident progression and mitigation is presented.

  11. Evaluating Rifean Corridor Closure using Detrital Zircon Sediment Provenance of the Taza-Guercif Basin, Morocco

    NASA Astrophysics Data System (ADS)

    Pratt, J. R.; Barbeau, D. L.; Emran, A.

    2013-12-01

    In the late Miocene, the connection between the Mediterranean Sea and Atlantic Ocean was tectonically severed leading to severe evaporative draw down of Mediterranean sea level such that the entire basin was desiccated or near desiccated in an event from ~5.96-5.33 Ma known as the Messinian Salinity Crisis (MSC). The MSC sequestered 6% of global ocean salinity into evaporite deposits, created a deep, dry and hot basin that altered global atmospheric circulation, opened passageways for mammal migration between Europe, Africa and Arabia and ended in the largest flood observed in the geologic record. The combined effects of the Messinian Salinity Crisis make it the most important oceanic event in the last 20 million years, yet despite the dramatic ramifications of the MSC, the exact nature of its cause has remained both elusive and controversial. By examining the sedimentary provenance of Rifean Corridor, this research evaluates the progression of corridor closure and the tectonic context of the initiation of the Messinian Salinity Crisis. The difficulty in evaluating the progression of closure is due to the tectonic complexity of the Africa-Eurasia convergent plate boundary in north-central Morocco. The shortening associated with the tectonic convergence is accommodated by two genetically and tectonically distinct orogenic systems, the Rif and Atlas mountain belts, which lie in juxtaposition to the slab-rollback dominated Alboran Sea. The basins of the Rifean corridor lie between these two orogens and as such shortening and uplift associated with either or both ranges could be the cause of the corridor closure. Several hypotheses have been posited for the tectonic controls on basin emergence including slab-rollback related delamination on the Alboran margin, domal uplift of the Middle Atlas as well as a more traditional propagation of the Rifean orogenic wedge. This research provides the first quantitative provenance data for the Taza-Guercif basin in the form of LA-ICP-MS detrital zircon analysis of 10 samples from the basin-fill and 3 samples from two separate domains within the Rif. The new data reveal a lack of dramatic shifts in provenance within the basin-fill tied to corridor closure but instead reveal more subtle changes in peak zircon ages. Peak age shifts from 600 Ma to 700 Ma periodically within the strata in both open marine marls and within turbidites derived from the Middle Atlas in a pattern consistent with changes in basin bathymetry. Basin samples show an age-distribution consistent with the Rifean samples, which acquire an slight overprinting of Middle Atlas ages in the latter half of the succession. The data point to a progressive closure of the corridor through the advancement of the Rifean orogenic wedge with minor influence from uplift within the core of the Middle Atlas without a major shift in provenance during rapid basin emergence.

  12. JPRS Report, Arms Control.

    DTIC Science & Technology

    1991-01-30

    program of 15 January is limited to disar- mament. Work of no less importance is being carried out in other areas. Significant progress has been made in...Views Progress [PRAVDA 15 Jan] 18 ’Proper Perspective’Seen [B. Pvadvshev; PRAVDA 12 Jan] 20 Plan Said " Working Successfully’ [V. Chernyshev...Troop Withdrawals [Berlin ADN 15 Jan] 38 Last Air Force Regiment Leaves Czechoslovakia [A. Shapovalov; TASS 21 Jan] 38 First 93 Tanks Shipped

  13. RELAP-7 Closure Correlations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zou, Ling; Berry, R. A.; Martineau, R. C.

    The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework, MOOSE (Multi-Physics Object Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty years of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s and TRACE’s capabilities and extends their analysis capabilities for all reactor system simulation scenarios. The RELAP-7 codemore » utilizes the well-posed 7-equation two-phase flow model for compressible two-phase flow. Closure models used in the TRACE code has been reviewed and selected to reflect the progress made during the past decades and provide a basis for the colure correlations implemented in the RELAP-7 code. This document provides a summary on the closure correlations that are currently implemented in the RELAP-7 code. The closure correlations include sub-grid models that describe interactions between the fluids and the flow channel, and interactions between the two phases.« less

  14. HANFORD SITE RIVER CORRIDOR CLEANUP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanfordmore » river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.« less

  15. Distinct Temporal-Spatial Roles for Rho Kinase and Myosin Light Chain Kinase in Epithelial Purse-String Wound Closure

    PubMed Central

    RUSSO, JOHN M.; FLORIAN, PETER; SHEN, LE; GRAHAM, W. VALLEN; TRETIAKOVA, MARIA S.; GITTER, ALFRED H.; MRSNY, RANDALL J.; TURNER, JERROLD R.

    2005-01-01

    Background & Aims Small epithelial wounds heal by purse-string contraction of an actomyosin ring that is regulated by myosin light chain (MLC) kinase (MLCK) and rho kinase (ROCK). These studies aimed to define the roles of these kinases in purse-string wound closure. Methods Oligocellular and single-cell wounds were created in intestinal epithelial monolayers. Fluorescence imaging and electrophysiologic data were collected during wound closure. Human biopsies were studied immunohistochemically. Results Live-cell imaging of enhanced green fluorescent protein-β-actin defined rapid actin ring assembly within 2 minutes after wounding. This progressed to a circumferential ring within 8 minutes that subsequently contracted and closed the wound. We therefore divided this process into 2 phases: ring assembly and wound contraction. Activated rho and ROCK localized to the wound edge during ring assembly. Consistent with a primary role in the assembly phase, ROCK inhibition prevented actin ring assembly and wound closure. ROCK inhibition after ring assembly was complete had no effect. Recruitment and activation of MLCK occurred after ring assembly was complete and coincided with ring contraction. MLCK inhibition slowed and then stopped contraction but did not prevent ring assembly. MLCK inhibition also delayed barrier function recovery. Studies of human colonic biopsy specimens suggest that purse-string wound closure also occurs in vivo, because MLC phosphorylation was enhanced surrounding oligocellular wounds. Conclusions These results suggest complementary roles for these kinases in purse-string closure of experimental and in vivo oligocellular epithelial wounds; rho and ROCK are critical for actin ring assembly, while the activity of MLCK drives contraction. PMID:15825080

  16. Determining the Release of Radionuclides from Tank 18F Waste Residual Solids: FY2016 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, William D.; Hobbs, David T.

    Pore water leaching studies were conducted on actual Savannah River Site (SRS) Tank 18F residual waste solids to support Liquid Waste tank closure efforts. A test methodology was developed during previous simulant testing to produce slurries of tank residual solids and grout-representative solids in grout pore water solutions (based on SRS groundwater compositions) with pH and E h values expected during the aging of the closed waste tank. The target conditions are provided below where the initial pore water has a reducing potential and a relatively high pH (Reducing Region II). The pore water is expected to become increasingly oxidizingmore » with time (Oxidizing Region II) and during the latter stages of aging (Oxidizing Region III) the pH is expected to decrease. For the reducing case, tests were conducted with both unwashed and washed Tank 18F residual solids. For the oxidizing cases (Oxidizing Regions II and III), all samples were washed with simulated grout pore water solutions prior to testing, since it is expected that these conditions will occur after considerable pore water solution has passed through the system. For the reducing case, separate tests were conducted with representative ground grout solids and with calcium carbonate reagent, which is the grout phase believed to be controlling the pH. Ferrous sulfide (FeS) solids were also added to the reducing samples to lower the slurry E h value. Calcium carbonate solids were used as the grout-representative solid phase for each of the oxidizing cases. Air purge-gas with and without CO 2 removed was transferred through the oxidizing test samples and nitrogen purge-gas was transferred through the reducing test samples during leach testing. The target pH values were achieved to within 0.5 pH units for all samples. Leaching studies were conducted over an E h range of approximately 0.7 V. However, the highest and lowest E h values achieved of ~+0.5 V and ~-0.2 V were significantly less positive and less negative, respectively, than the target values. Achievement of more positive and more negative E h values is believed to require the addition of non-representative oxidants and reductants, respectively.« less

  17. A comparison of discrimination learning in touchscreen and 2-choice swim tank using an allelic series of Huntington's disease mice.

    PubMed

    Glynn, Dervila; Skillings, Elizabeth A; Morton, A Jennifer

    2016-05-30

    Progressive cognitive impairments are a major, debilitating symptom of neurodegenerative disorders such as Alzheimer's disease (AD) and Huntington's disease (HD). Developing treatments to slow or prevent cognitive decline is a key challenge for these fields. Unfortunately, preclinical therapeutic testing has not kept pace with molecular advances, and the methods for systematic cognitive testing in mice remain largely unchanged. Although higher throughput semi-automated systems exist, the lack of a 'positive control' (i.e. a drug or treatment that works) makes it challenging to test their sensitivity and predict usefulness for preclinical drug testing. We used an allelic series of transgenic HD mice to test the sensitivity and flexibility of two cognitive testing systems; a semi-automated touchscreen system and a traditional water-based task, the 2-choice swim tank. We found significant differences in performance of HD mice with different CAG repeats, with timing and severity of deficits dependent on CAG repeat length. We also found deficits in long-term memory retention that have not been reported previously. Both systems were useful for detecting deficits, and were sensitive enough to detect small changes (10-20%) in cognitive performance. While the touchscreen system is more sensitive and can identify deficits up to 10 weeks earlier than the 2-choice swim tank, both tests detected similar patterns of deficit progression in HD mice, regardless of CAG repeat length. Thus, although it has its limitations, the 2-choice swim tank remains a simple, cheap and accessible system for assessing cognitive function. Copyright © 2015 Elsevier B.V. All rights reserved.

  18. Progress in modeling hypersonic turbulent boundary layers

    NASA Technical Reports Server (NTRS)

    Zeman, Otto

    1993-01-01

    A good knowledge of the turbulence structure, wall heat transfer, and friction in turbulent boundary layers (TBL) at high speeds is required for the design of hypersonic air breathing airplanes and reentry space vehicles. This work reports on recent progress in the modeling of high speed TBL flows. The specific research goal described here is the development of a second order closure model for zero pressure gradient TBL's for the range of Mach numbers up to hypersonic speeds with arbitrary wall cooling requirements.

  19. High temperature causes negative whole-plant carbon balance under mild drought.

    PubMed

    Zhao, Junbin; Hartmann, Henrik; Trumbore, Susan; Ziegler, Waldemar; Zhang, Yiping

    2013-10-01

    Theoretically, progressive drought can force trees into negative carbon (C) balance by reducing stomatal conductance to prevent water loss, which also decreases C assimilation. At higher temperatures, negative C balance should be initiated at higher soil moisture because of increased respiratory demand and earlier stomatal closure. Few data are available on how these theoretical relationships integrate over the whole plant. We exposed Thuja occidentalis to progressive drought under three temperature conditions (15, 25, and 35°C), and measured C and water fluxes using a whole-tree chamber design. High transpiration rates at higher temperatures led to a rapid decline in soil moisture. During the progressive drought, soil moisture-driven changes in photosynthesis had a greater impact on the whole-plant C balance than respiration. The soil moisture content at which whole-plant C balance became negative increased with temperature, mainly as a result of higher respiration rates and an earlier onset of stomatal closure under a warmer condition. Our results suggest that the effect of drought on whole-plant C balance is highly temperature-dependent. High temperature causes a negative C balance even under mild drought and may increase the risk of C starvation. © 2013 The Authors. New Phytologist © 2013 New Phytologist Trust.

  20. Developing a model for moisture in saltcake waste tanks: Progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simmons, C.S.; Aimo, N.; Fayer, M.J.

    1997-07-01

    This report describes a modeling effort to provide a computer simulation capability for estimating the distribution and movement of moisture in the saltcake-type waste contained in Hanford`s single-shell radioactive waste storage tanks. This moisture model goes beyond an earlier version because it describes water vapor movement as well as the interstitial liquid held in a saltcake waste. The work was performed by Pacific Northwest National Laboratory to assist Duke Engineering and Services Hanford with the Organic Tank Safety Program. The Organic Tank Safety Program is concerned whether saltcake waste, when stabilized by jet pumping, will retain sufficient moisture near themore » surface to preclude any possibility of an accidental ignition and propagation of burning. The nitrate/nitrite saltcake, which might also potentially include combustible organic chemicals might not always retain enough moisture near the surface to preclude any such accident. Draining liquid from a tank by pumping, coupled with moisture evaporating into a tank`s head space, may cause a dry waste surface that is not inherently safe. The moisture model was devised to help examine this safety question. The model accounts for water being continually cycled by evaporation into the head space and returned to the waste by condensation or partly lost through venting to the external atmosphere. Water evaporation occurs even in a closed tank, because it is driven by the transfer to the outside of the heat load generated by radioactivity within the waste. How dry a waste may become over time depends on the particular hydraulic properties of a saltcake, and the model uses those properties to describe the capillary flow of interstitial liquid as well as the water vapor flow caused by thermal differences within the porous waste.« less

  1. The qualification of the shuttle booster separation motors

    NASA Technical Reports Server (NTRS)

    Chase, C. A.; Fisher, K. M.; Eoff, W.

    1978-01-01

    Four booster separation motors (BSM) located at each end of every solid rocket booster (SRB) provide the needed side force to separate the boosters from the external tank at booster burnout. Four BSMs at the top of the SRB are located in a box pattern in the nose cone frustum. The four BSMs at the aft end of the SRB are arranged side-by-side on the SRB aft skirt. Aspects of BSM design and performance are considered, taking into account a motor design/performance summary, the case design, the insulation, the grain design, the nozzle/aft closure design, the ignition system, the propellant, and the motor assembly. Details of motor testing are also discussed, giving attention to development testing, qualification testing, and flight testing.

  2. Nuclear Power Plant Mechanical Component Flooding Fragility Experiments Status

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pope, C. L.; Savage, B.; Johnson, B.

    This report describes progress on Nuclear Power Plant mechanical component flooding fragility experiments and supporting research. The progress includes execution of full scale fragility experiments using hollow-core doors, design of improvements to the Portal Evaluation Tank, equipment procurement and initial installation of PET improvements, designation of experiments exploiting the improved PET capabilities, fragility mathematical model development, Smoothed Particle Hydrodynamic simulations, wave impact simulation device research, and pipe rupture mechanics research.

  3. Construction Management Activities of Governmental Agencies in the New England Area During the Construction Phase.

    DTIC Science & Technology

    1980-02-01

    automatic data exchange ... 56 There are currently 12 Data Systems available: I. Integrated Disbursing and Accounting (IDA) 2. Integrated Program Management...construction project progress through the use of a CPM scheduling and progress reporting system . It automatically generates invoices for payment and payment...posted on the project. Water will be drained daily from tanks of vehicle air brake systems . Rtigging, hooks, pendants and slings will be examined

  4. Reusable cryogenic foam insulation for advanced aerospace vehicles

    NASA Technical Reports Server (NTRS)

    Mcauliffe, Patrick S.; Taylor, Allan H.; Sparks, Larry L.; Dube, William P.

    1991-01-01

    Future high-speed aircraft and aerospace vehicles using cryogenic propellants will require an advanced reusable insulation system for the propellant tank structure. This cryogenic insulation system must be lightweight, structurally and thermally efficient, and capable of multiple reuse without cracking or degraded performance. This paper presents recent progress in the development of a reusable cryogenic foam insulation system having a maximum service temperature of 400 F. The system consists of preshaped, precut blocks of rigid polymethacrylimide foam insulation, wrapped with a high-temperature Kapton and aluminum foil vapor barrier which is adhesively bonded to the propellant tank wall.

  5. Burn Wound Healing and Tissue Engineering.

    PubMed

    Singer, Adam J; Boyce, Steven T

    In 2016 the American Burn Association held a State of the Science conference to help identify burn research priorities for the next decade. The current paper summarizes the work of the sub-committee on Burn Wound Healing and Tissue Engineering. We first present the priorities in wound healing research over the next 10 years. We then summarize the current state of the science related to burn wound healing and tissue engineering including determination of burn depth, limiting burn injury progression, eschar removal, management of microbial contamination and wound infection, measuring wound closure, accelerating wound healing and durable wound closure, and skin substitutes and tissue engineering. Finally, a summary of the round table discussion is presented.

  6. LES, DNS and RANS for the analysis of high-speed turbulent reacting flows

    NASA Technical Reports Server (NTRS)

    Givi, Peyman

    1994-01-01

    The objective of this research is to continue our efforts in advancing the state of knowledge in Large Eddy Simulation (LES), Direct Numerical Simulation (DNS), and Reynolds Averaged Navier Stokes (RANS) methods for the analysis of high-speed reacting turbulent flows. In the first phase of this research, conducted within the past six months, focus was in three directions: RANS of turbulent reacting flows by Probability Density Function (PDF) methods, RANS of non-reacting turbulent flows by advanced turbulence closures, and LES of mixing dominated reacting flows by a dynamics subgrid closure. A summary of our efforts within the past six months of this research is provided in this semi-annual progress report.

  7. Comparative analysis of ear-hole closure identifies epimorphic regeneration as a discrete trait in mammals

    PubMed Central

    Gawriluk, Thomas R.; Simkin, Jennifer; Thompson, Katherine L.; Biswas, Shishir K.; Clare-Salzler, Zak; Kimani, John M.; Kiama, Stephen G.; Smith, Jeramiah J.; Ezenwa, Vanessa O.; Seifert, Ashley W.

    2016-01-01

    Why mammals have poor regenerative ability has remained a long-standing question in biology. In regenerating vertebrates, injury can induce a process known as epimorphic regeneration to replace damaged structures. Using a 4-mm ear punch assay across multiple mammalian species, here we show that several Acomys spp. (spiny mice) and Oryctolagus cuniculus completely regenerate tissue, whereas other rodents including MRL/MpJ ‘healer' mice heal similar injuries by scarring. We demonstrate ear-hole closure is independent of ear size, and closure rate can be modelled with a cubic function. Cellular and genetic analyses reveal that injury induces blastema formation in Acomys cahirinus. Despite cell cycle re-entry in Mus musculus and A. cahirinus, efficient cell cycle progression and proliferation only occurs in spiny mice. Together, our data unite blastema-mediated regeneration in spiny mice with regeneration in other vertebrates such as salamanders, newts and zebrafish, where all healthy adults regenerate in response to injury. PMID:27109826

  8. Perforation of the right aortic valve cusp: complication of ventricular septal defect closure with a modified Rashkind umbrella.

    PubMed

    Vogel, M; Rigby, M L; Shore, D

    1996-01-01

    An 18-month-old boy with a perimembranous ventricular septal defect (VSD) had undergone transcatheter closure of the defect with a modified 17 mm Rashkind umbrella device at age 4 months (weight 3.8 kg). The clinical signs of a VSD persisted, and he developed aortic incompetence, first detected 5 months after the procedure, which progressed from mild to moderate. A three-dimensional echocardiographic study demonstrated that one of the four arms holding the umbrella was protruding into the aortic valve and had perforated the right aortic valve cusp. This diagnosis was confirmed at subsequent surgery. Surgical repair of the perforated right aortic valve leaflet was necessary. The umbrella was adherent to the tricuspid valve and could not be removed. Instead it was left in situ, but three of the stainless steel arms were cut off. When umbrella closure of a perimembranous VSD is undertaken, the close proximity of part of the distal umbrella to the aortic valve can lead to aortic regurgitation.

  9. Progressive Tightening of Pulley Sutures for Primary Repair of Large Scalp Wounds

    PubMed Central

    McLaughlin, Jillian M.; Ross, Lindy S.; Phillips, Linda G.; Wagner, Richard F.

    2017-01-01

    Summary: Scalp defects greater than 2 cm in diameter are not usually amenable to primary closure and require local tissue rearrangement, grafting, tissue expansion, or prolonged second intention healing. Scalp flap reconstruction is a significant undertaking that requires elevation of a total flap surface area that is 3–6 times the size of the defect, often involves profuse bleeding, and can be challenging to perform without conscious sedation or general anesthesia. Anticoagulated and medically complex patients pose additional challenges and limit options for treatment. The pulley suture uses the mechanical advantage of the pulley to distribute tension across a wound and is useful in areas of high tension such as scalp wounds. For scalp wounds greater than 2 cm, pulley sutures are placed along the length of the wound. An assistant exerts equal tension on the pulley sutures, and the surgeon sequentially ties the sutures. The sutures are tightened and retied weekly until complete scalp closure is achieved. The pulley sutures can be used for rapid primary closure of scalp wounds up to 2.5–3.0 cm in diameter under local anesthesia. For scalp wounds larger than 3 cm, we have also found that pulley sutures can be progressively tightened yielding additional tissue expansion every week. Scalp wounds greater than 3.0 cm can be easily closed via primary repair and weekly tightening of pulley sutures without the need for flap reconstruction, traditional tissue expander placement, or second intention healing. PMID:29632771

  10. Logarithmic spiral flap for circular or oval defects on the lateral surface of the nose and nasal ala: a series of 15 cases.

    PubMed

    Moreno-Artero, E; Redondo, P

    2015-10-01

    A large number of flaps, particularly rotation and transposition flaps, have been described for the closure of skin defects left by oncologic surgery of the nose. The logarithmic spiral flap is a variant of the rotation flap. We present a series of 15 patients with different types of skin tumor on the nose. The skin defect resulting from excision of the tumor by micrographic surgery was reconstructed using various forms of the logarithmic spiral flap. There are 3 essential aspects to flap design: commencement of the pedicle at the upper or lower border of the wound, a width of the distal end of the flap equal to the vertical diameter of the defect, and a progressive increase in the radius of the spiral from the distal end of the flap to its base. The cosmetic and functional results of surgical reconstruction were satisfactory, and no patient required additional treatment to improve scar appearance. The logarithmic spiral flap is useful for the closure of circular or oval defects situated on the lateral surface of the nose and nasal ala. The flap initiates at one of the borders of the wound as a pedicle with a radius that increases progressively to create a spiral. We propose the logarithmic spiral flap as an excellent option for the closure of circular or oval defects of the nose. Copyright © 2015 Elsevier España, S.L.U. and AEDV. All rights reserved.

  11. Alternating-Polarity Arc Welding

    NASA Technical Reports Server (NTRS)

    Schwinghamer, R. J.

    1987-01-01

    Brief reversing polarity of welding current greatly improves quality of welds. NASA technical memorandum recounts progress in art of variable-polarity plasma-arc (VPPA) welding, with emphasis on welding of aluminum-alloy tanks. VPPA welders offer important advantages over conventional single-polarity gas/tungsten arc welders.

  12. Identity Formation Re-revisited: A Rejoinder to Waterman on Developmental and Cross-Cultural Issues.

    ERIC Educational Resources Information Center

    Meeus, W.; Iedema, J.; Vollebergh, W.

    1999-01-01

    Examines similarities and differences between American and Dutch research on identity formation and psychological well-being in adolescent and young adults. Concludes that identity development is systematically progressive and may be described with the trajectory diffusion?closure/moratorium?achieving commitment. Age differences are found in the…

  13. Comparative urodynamic studies of continent and stress incontinent women in pregnancy and in the puerperium.

    PubMed

    Iosif, S; Ulmsten, U

    1981-07-15

    Twelve pregnant women were examined by urethral pressure profile measurement and simultaneous urethrocystometry early in pregnancy (weeks 12 to 16), in the thirty-eighth week, and 5 to 7 days after delivery. All patients reported symptoms of stress incontinence starting at an early 5 to 7 days after delivery. All patients reported symptoms of stress incontinence starting at an early gestational age, it was found that that the stress incontinent women, compared to 14 continent, healthy women from whom measurements were obtained earlier, had shorter urethral lengths. Furthermore, no increase in urethral length during pregnancy was registered among the stress incontinent women, whereas such an increase did occur in the continent women. In contrast to the continent women, the incontinent patients had a low urethral closure pressure at rest and this pressure did not appear to increase sufficiently to compensate for the progressive increase in bladder pressure during pregnancy. As a result the urethral closure pressure in the stress incontinent women, therefore, decreased more and more during stress situations as pregnancy progressed, resulting in an increased leakage of urine.

  14. Progress in Hanford's Double-Shell Tank Integrity Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryson, D.C.; Washenfelder, D.J.; Boomer, K.D.

    2008-07-01

    The U.S. Department of Energy's Office of River Protection has an extensive integrity assessment program for the Hanford Site Double-Shell Tank System. The DOE Orders and environmental protection regulations provide the guidelines for the activities used to inspect and maintain 28 double-shell tanks (DSTs), the waste evaporator, and ancillary equipment that compose this system. This program has been reviewed by oversight and regulatory bodies and found to comply with the established guidelines. The basis for the DOE Order 435.1-1 for tank integrity comes from the Tank Structural Integrity Panel led by Brookhaven National Laboratory during the late 1990's. These guidelinesmore » established criteria for performing Non-Destructive Examination (NDE), for acceptance of the NDE results, for waste chemistry control, and for monitoring the tanks. The environmental regulations mirror these requirements and allow for the tank integrity program to provide compliant storage of the tanks. Both sets of requirements provide additional guidance for the protection of ancillary equipment. CH2M HILL uses two methods of NDE: visual inspection and Ultrasonic Testing (UT). The visual inspection program examines the primary tank and secondary liner of the DST. The primary tank is examined both on the interior surface above the waste in the tank and on the exterior surface facing the annulus of the DST. The interior surface of the tank liner is examined at the same time as the outer surface of the primary tank. The UT program examines representative areas of the primary tank and secondary liner by deploying equipment in the annulus of the tank. Both programs have led to the development of new equipment for remote inspection of the tanks. Compact camera and enhanced lighting systems have been designed and deployed through narrow access ports (called risers) into the tanks. The UT program has designed two generations of crawlers and equipment for deployment through risers into the thermally hot and radioactive environment. Also extensions were developed to allow inspection of the tank's curve upper (haunch) and lower (knuckle) surfaces. CH2M HILL primarily maintains chemistry control of the DST by ensuring that the concentrations of hydroxide and nitrite ions are favorable with respect to the nitrate ion concentration in the waste. This control program is supported by an extensive sampling program that obtains samples from the supernatant and solid layers in the tank to ensure compliance with the chemical specification. At DOE direction, CH2M HILL has embarked on a waste chemistry optimization program to enhance the protection of the tank surface and the understanding of the parameters that affect general and localized corrosion in the tanks. Over the past decade, DOE has deployed Electrochemical Noise corrosion probes in the DST to monitor localized corrosion. From the information gathered as part of the chemistry control, new information has been identified about the parameters requiring control to ensure tank integrity. CH2M HILL is deploying a series of corrosion probes to test and employ these parameters to provide real time corrosion monitoring of the DSTs. (authors)« less

  15. KSC-2010-4794

    NASA Image and Video Library

    2010-09-20

    NEW ORLEANS -- Associate Administrator for Space Operations Bill Gerstenmaier and Manny Zulueta, Lockheed Martin vice president and site executive at NASA's Michoud Assembly Facility in New Orleans, discuss the progress of the Space Shuttle Program's last external fuel tank, ET-122, as it is being transported from the facility to the Pegasus Barge. The tank will travel 900 miles by sea to NASA's Kennedy Space Center in Florida, secured aboard the barge, offloaded and moved to Kennedy's Vehicle Assembly Building where it will be integrated to space shuttle Endeavour for the STS-134 mission to the International Space Station. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. STS-134, targeted to launch Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  16. KSC-2010-4795

    NASA Image and Video Library

    2010-09-20

    NEW ORLEANS -- Associate Administrator for Space Operations Bill Gerstenmaier and Manny Zulueta, Lockheed Martin vice president and site executive at NASA's Michoud Assembly Facility in New Orleans, watch the progress of the Space Shuttle Program's last external fuel tank, ET-122, as it is being transported from the facility to the Pegasus Barge. The tank will travel 900 miles by sea to NASA's Kennedy Space Center in Florida secured aboard the barge, offloaded and moved to Kennedy's Vehicle Assembly Building where it will be integrated to space shuttle Endeavour for the STS-134 mission to the International Space Station. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. STS-134, targeted to launch Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  17. KSC-2010-4796

    NASA Image and Video Library

    2010-09-20

    NEW ORLEANS -- At NASA's Michoud Assembly Facility in New Orleans, Associate Administrator for Space Operations Bill Gerstenmaier and a Michoud employee discuss the progress of the Space Shuttle Program's last external fuel tank, ET-122, as it is being transported from the facility to the Pegasus Barge. The tank will travel 900 miles by sea to NASA's Kennedy Space Center in Florida secured aboard the barge, offloaded and moved to Kennedy's Vehicle Assembly Building where it will be integrated to space shuttle Endeavour for the STS-134 mission to the International Space Station. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. STS-134, targeted to launch Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. Photo credit: NASA/Kim Shiflett

  18. Randomized controlled multicentre study comparing biological mesh closure of the pelvic floor with primary perineal wound closure after extralevator abdominoperineal resection for rectal cancer (BIOPEX-study)

    PubMed Central

    2014-01-01

    Background Primary perineal wound closure after conventional abdominoperineal resection (cAPR) for rectal cancer has been the standard of care for many years. Since the introduction of neo-adjuvant radiotherapy and the extralevator APR (eAPR), oncological outcome has been improved, but at the cost of increased rates of perineal wound healing problems and perineal hernia. This has progressively increased the use of biological meshes, although not supported by sufficient evidence. The aim of this study is to determine the effectiveness of pelvic floor reconstruction using a biological mesh after standardized eAPR with neo-adjuvant (chemo)radiotherapy compared to primary perineal wound closure. Methods/Design In this multicentre randomized controlled trial, patients with a clinical diagnosis of primary rectal cancer who are scheduled for eAPR after neo-adjuvant (chemo)radiotherapy will be considered eligible. Exclusion criteria are prior radiotherapy, sacral resection above S4/S5, allergy to pig products or polysorbate, collagen disorders, and severe systemic diseases affecting wound healing, except for diabetes. After informed consent, 104 patients will be randomized between standard care using primary wound closure of the perineum and the experimental arm consisting of suturing a biological mesh derived from porcine dermis in the pelvic floor defect, followed by perineal closure similar to the control arm. Patients will be followed for one year after the intervention and outcome assessors and patients will be blinded for the study treatment. The primary endpoint is the percentage of uncomplicated perineal wound healing, defined as a Southampton wound score of less than II on day 30. Secondary endpoints are hospital stay, incidence of perineal hernia, quality of life, and costs. Discussion The BIOPEX-study is the first randomized controlled multicentre study to determine the additive value of using a biological mesh for perineal wound closure after eAPR with neo-adjuvant radiotherapy compared to primary perineal wound closure with regard to perineal wound healing and the occurrence of perineal hernia. Trail registration number NCT01927497 (Clinicaltrial.gov). PMID:25163547

  19. Progress Report on SAM Reduced-Order Model Development for Thermal Stratification and Mixing during Reactor Transients

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hu, R.

    This report documents the initial progress on the reduced-order flow model developments in SAM for thermal stratification and mixing modeling. Two different modeling approaches are pursued. The first one is based on one-dimensional fluid equations with additional terms accounting for the thermal mixing from both flow circulations and turbulent mixing. The second approach is based on three-dimensional coarse-grid CFD approach, in which the full three-dimensional fluid conservation equations are modeled with closure models to account for the effects of turbulence.

  20. NEARING THE END OF CONSTRUCTION ON THE LOX TEST STAND AT MSFC.

    NASA Image and Video Library

    2015-01-08

    AS THE END OF CONSTRUCTION ON TEST STAND 4697, THE LIQUID OXYGEN TANK TEST STAND AT MARSHALL SPACE FLIGHT CENTER, PROJECT ENGINEERS PHIL HENDRIX, FROM MSFC, AND CURTNEY WALTERS FROM THE U.S. CORP OF ENGINEERS, STUDY PLANS AND PROGRESS.

  1. Tank Waste Retrieval Lessons Learned at the Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dodd, R.A.

    One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons ofmore » this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST salt-cake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the Tri- Party Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 ft{sup 3} in 530,000 gallon or larger tanks; 30 ft{sup 3} in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an exception to the waste retrieval criteria for a specific tank. Tank waste retrieval has been conducted at the Hanford Site over the last few decades using a method referred to as Past Practice Hydraulic Sluicing. Past Practice Hydraulic Sluicing employs large volumes of DST supernatant and water to dislodge, dissolve, mobilize, and retrieve tank waste. Concern over the leak integrity of SSTs resulted in the need for tank waste retrieval methods capable of using smaller volumes of liquid in a more controlled manner. Retrieval of SST waste in accordance with HFFACO requirements was initiated at the Hanford Site in April 2003. New and innovative tank waste retrieval methods that minimize and control the use of liquids are being implemented for the first time. These tank waste retrieval methods replace Past Practice Hydraulic Sluicing and employ modified sluicing, vacuum retrieval, and in-tank vehicle techniques. Waste retrieval has been completed in seven Hanford Site SSTs (C-106, C-103, C-201, C-202, C-203, C-204, and S-112) in accordance with HFFACO requirements. Three additional tanks are currently in the process of being retrieved (C-108, C-109 and S-102) Preparation for retrieval of two additional SSTs (C-104 and C-110) is ongoing with retrieval operations forecasted to start in calendar year 2008. Tank C-106 was retrieved to a residual waste volume of 470 ft{sup 3} using oxalic acid dissolution and modified sluicing. An Appendix H exception request for Tank C-106 is undergoing review. Tank C-103 was retrieved to a residual volume of 351 ft{sup 3} using a modified sluicing technology. This approach was successful at reaching the TPA limits for this tank of less than 360 ft{sup 3}and the limits of the technology. Tanks C-201, C-202, C-203, and C-204 are smaller (55,000 gallon) tanks and waste removal was completed in accordance with HFFACO requirements using a vacuum retrieval system. Residual waste volumes in each of these four tanks were less than 25 ft{sup 3}. Tank S-112 retrieval was completed February 28, 2007, meeting the TPA Limits of less than 360 cu ft using salt-cake dissolution, modified sluicing, in-tank vehicle with high pressure water spray and caustic dissolution. Tanks C-108 and C-109 have been retrieved to 90% and 85% respectively. Modified sluicing was no longer effective at retrieving the remaining 5,000 to 10,000 gallons of residual. A Mobile Retrieval Tool (FoldTrac) is scheduled for installation early in 2008 to assist in breaking up chunks of waste and mobilizing the waste for transfer. Lessons learned from application of new tank waste retrieval methods are being documented and incorporated into future retrieval operations. They address all phases of retrieval including process design, equipment procurement and installation, supporting documentation, and system operations. Information is obtained through interviews with retrieval project personnel, focused workshops, review of problem evaluation requests, and evaluation of retrieval performance data. This paper presents current retrieval successes and lessons learned from retrieval of tank waste at the Hanford Site and discusses how this information is used to optimize retrieval system efficiency, improve overall cost effectiveness of retrieval operations, and ensure that HFFACO requirements are met. (authors)« less

  2. KSC-2010-4916

    NASA Image and Video Library

    2010-09-29

    CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, workers monitor the progress of External Fuel Tank-122 as it is lifted toward a test cell. ET-122, the Space Shuttle Program's last external fuel tank was delivered to Kennedy's Turn Basin from NASA’s Michoud Assembly Facility in New Orleans aboard the Pegasus Barge. After testing, ET-122 eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station targeted to launch February, 2011. For more information visit: http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Dimitri Gerondidakis

  3. In- and outdoor reproduction of first generation common sole Solea solea under a natural photothermal regime: Temporal progression of sexual maturation assessed by monitoring plasma steroids and gonadotropin mRNA expression.

    PubMed

    Palstra, A P; Blok, M C; Kals, J; Blom, E; Tuinhof-Koelma, N; Dirks, R P; Forlenza, M; Blonk, R J W

    2015-09-15

    Reproduction of many temperate fishes is seasonal and maturation and spawning of gametes are under photothermal control. Reproductive success of first generation (G1) common sole Solea solea in captivity has been low. In this study, the sexual maturation status has been assessed during the prespawning months in G1 sole that were housed (a) outdoor under the natural photoperiod and temperature, or (b) indoor under artificial photothermal induction. Maturation was assessed in male and female G1 broodstock in November as controls, after which the remaining population was divided over two outdoor flow-through tanks placed in a pond and two indoor recirculating aquaculture system (RAS) tanks. Subsequently, maturation status (gonadosomatic index GSI and plasma levels of testosterone T and 17β-estradiol E2) was assessed in one tank for each condition in January, February and during spawning in early April, while fish in the other tank were not disturbed in achieving reproductive success. Quantitative real-time PCR was performed to determine species-specific gonadotropin mRNA expression in females. Successful G1 spawning and egg fertilisation occurred in all experimental tanks. Gonadal development was similar under both conditions. Higher E2 and T levels were found in indoor housed females. Gonadotropin expression revealed similar profiles between outdoor and indoor housed females. G1 sole could be reproduced in the outdoor tanks under the natural photoperiod and in the indoor tanks under artificial simulation of this regime that includes a potentially crucial chilling period of 2-3 months at 5-7 °C. Copyright © 2015 Elsevier Inc. All rights reserved.

  4. Micromachined peristaltic pumps

    NASA Technical Reports Server (NTRS)

    Hartley, Frank T. (Inventor)

    1999-01-01

    Micromachined pumps including a channel formed between a first membrane and a substrate or between first and second flexible membranes. A series of electrically conductive strips is applied to a surface of the substrate or one of the membranes. Application of a sequential voltage to the series of strips causes a region of closure to progress down the channel to achieve a pumping action.

  5. RECOMMENDATIONS FOR SAMPLING OF TANK 19 IN F TANK FARM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, S.; Shine, G.

    2009-12-14

    Representative sampling is required for characterization of the residual material in Tank 19 prior to operational closure. Tank 19 is a Type IV underground waste storage tank located in the F-Tank Farm. It is a cylindrical-shaped, carbon steel tank with a diameter of 85 feet, a height of 34.25 feet, and a working capacity of 1.3 million gallons. Tank 19 was placed in service in 1961 and initially received a small amount of low heat waste from Tank 17. It then served as an evaporator concentrate (saltcake) receiver from February 1962 to September 1976. Tank 19 also received the spentmore » zeolite ion exchange media from a cesium removal column that once operated in the Northeast riser of the tank to remove cesium from the evaporator overheads. Recent mechanical cleaning of the tank removed all mounds of material. Anticipating a low level of solids in the residual waste, Huff and Thaxton [2009] developed a plan to sample the waste during the final clean-up process while it would still be resident in sufficient quantities to support analytical determinations in four quadrants of the tank. Execution of the plan produced fewer solids than expected to support analytical determinations in all four quadrants. Huff and Thaxton [2009] then restructured the plan to characterize the residual separately in the North and the South regions: two 'hemispheres.' This document provides sampling recommendations to complete the characterization of the residual material on the tank bottom following the guidance in Huff and Thaxton [2009] to split the tank floor into a North and a South hemisphere. The number of samples is determined from a modification of the formula previously published in Edwards [2001] and the sample characterization data for previous sampling of Tank 19 described by Oji [2009]. The uncertainty is quantified by an upper 95% confidence limit (UCL95%) on each analyte's mean concentration in Tank 19. The procedure computes the uncertainty in analyte concentration as a function of the number of samples, and the final number of samples is determined when the reduction in the uncertainty from an additional sample no longer has a practical impact on results. The characterization of the full suite of analytes in the North and South hemispheres is currently supported by a single Mantis rover sample in each hemisphere. A floor scrape sample was obtained from a compact region near the center riser slightly in the South hemisphere and has been analyzed for a shortened list of key analytes. There is not enough additional material from the floor scrape sample material for completing the full suite of constituents. No floor scrape samples have been previously taken from the North hemisphere. The criterion to determine the number of additional samples was based on the practical reduction in the uncertainty when a new sample is added. This was achieved when five additional samples are obtained. In addition, two archived samples will be used if a contingency such as failing to demonstrate the comparability of the Mantis samples to the floor scrape samples occurs. To complete sampling of the Tank 19 residual floor material, four additional samples should be taken from the North hemisphere and four additional samples should be taken from the South hemisphere. One of the samples from each hemisphere will be archived in case of need. Three of the four additional samples from each hemisphere will be analyzed. Once the results are available, differences between the Mantis and three floor scrape sample results will be evaluated. If there are no statistically significant analyte concentration differences between the Mantis and floor scrape samples, those results will be combined and then UCL95%s will be calculated. If the analyte concentration differences between the Mantis and floor scrape samples are statistically significant, the UCL95%s will be calculated without the Mantis sample results. If further reduction in the upper confidence limits is needed and can be achieved by the addition of the archived samples, they will be analyzed and included in the statistical computations. Initially the analyte concentrations in the residual material on the floor of Tank 19 will be determined separately in the North and the South hemispheres. However, if final sampling results show that differences between the North and South samples are consistent within sampling variation, then the final computations can be based on consolidating all sample results from the tank floor. Recommended locations may be subject to physical tank access and sampling constraints for the additional samples. The recommendations have been discussed in Section 4 and are based on partitioning the Tank 19 floor into an inner and an outer ring and six 60{sup o} sectors depicted in Figure 1. The location of the border between the inner and outer rings is based on dividing the residual material into two approximately equal volumes.« less

  6. Communication strategies and timeliness of response to life critical telemetry alarms.

    PubMed

    Bonzheim, Kimberly A; Gebara, Rani I; O'Hare, Bridget M; Ellis, R Darin; Brand, Monique A; Balar, Salil D; Stockman, Rita; Sciberras, Annette M; Haines, David E

    2011-05-01

    A centralized electrocardiogram telemetry monitoring system (TMS) facilitates early identification of critical arrhythmias and acute medical decompensation. Timely intervention can only be performed if abnormalities are communicated rapidly to the direct caregiver. The study objectives were to measure effectiveness of bi-directional voice communication badges versus one-way alphanumeric pagers for telemetry alarm response and communication loop closure. A sequential observational pilot study of nursing response to TMS alarms compared communication technologies on four nursing units in a 1,061 bed tertiary care hospital with 264 TMS channels of telemetry over a 2-year period. Subsequently, the communication technologies were compared in a randomized fashion on a 68-bed progressive cardiac care unit. Caregivers were blinded to the protocol. All alarm responses were recorded during two periods using either pagers or voice communication devices. Alarm response time and closure of the communication loop were analyzed in a blinded fashion. The direct communication functionality of the badge significantly shortened the time to first contact, time to completion, and rate of closure of the communication loop in both the pilot and study phases. Median time to first contact with the communication badge was 0.5  min, compared to 1.6  min with pager communication (p < 0.0003). Communication loop closure was achieved in 100% of clinical alarms using the badge versus 19% with the pager (p < 0.0001). Communication badge technology reduced alarm time to first contact and completion as well as facilitated communication loop closures. Immediate two-way communication significantly impacted practice, alarm management, and resulted in faster bedside care.

  7. Geochemical Data Package for Performance Assessment Calculations Related to the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaplan, Daniel I.

    The Savannah River Site (SRS) disposes of low-level radioactive waste (LLW) and stabilizes high-level radioactive waste (HLW) tanks in the subsurface environment. Calculations used to establish the radiological limits of these facilities are referred to as Performance Assessments (PA), Special Analyses (SA), and Composite Analyses (CA). The objective of this document is to revise existing geochemical input values used for these calculations. This work builds on earlier compilations of geochemical data (2007, 2010), referred to a geochemical data packages. This work is being conducted as part of the on-going maintenance program of the SRS PA programs that periodically updates calculationsmore » and data packages when new information becomes available. Because application of values without full understanding of their original purpose may lead to misuse, this document also provides the geochemical conceptual model, the approach used for selecting the values, the justification for selecting data, and the assumptions made to assure that the conceptual and numerical geochemical models are reasonably conservative (i.e., bias the recommended input values to reflect conditions that will tend to predict the maximum risk to the hypothetical recipient). This document provides 1088 input parameters for geochemical parameters describing transport processes for 64 elements (>740 radioisotopes) potentially occurring within eight subsurface disposal or tank closure areas: Slit Trenches (ST), Engineered Trenches (ET), Low Activity Waste Vault (LAWV), Intermediate Level (ILV) Vaults, Naval Reactor Component Disposal Areas (NRCDA), Components-in-Grout (CIG) Trenches, Saltstone Facility, and Closed Liquid Waste Tanks. The geochemical parameters described here are the distribution coefficient, Kd value, apparent solubility concentration, k s value, and the cementitious leachate impact factor.« less

  8. Districts' Efficiency Evaluated in Report

    ERIC Educational Resources Information Center

    Samuels, Christina A.

    2011-01-01

    A report from a progressive think tank measuring the "educational productivity" of more than 9,000 school districts around the country says that districts getting the most for their money tend to spend more on teachers and less on administration, partner with their communities to save money, and have school boards willing to make…

  9. An Analysis of Trends for People with MR, Cerebral Palsy, and Epilepsy Receiving Services from State VR Agencies: Ten Years of Progress.

    ERIC Educational Resources Information Center

    Gilmore, Dana Scott; Schuster, Jennifer L.; Timmons, Jaimie Ciulla; Butterworth, John

    2000-01-01

    Presents the results of a secondary analysis of the RSA- 911 database from the Rehabilitation Services Administration. All successful vocational rehabilitation (VR) closures for individuals with mental retardation, cerebral palsy, and epilepsy for five data points between 1985 and 1995 were investigated. Trends in the use of competitive employment…

  10. Natural orifice translumenal endoscopic surgery: Progress in humans since white paper

    PubMed Central

    Santos, Byron F; Hungness, Eric S

    2011-01-01

    Since the first description of the concept of natural orifice translumenal endoscopic surgery (NOTES), a substantial number of clinical NOTES reports have appeared in the literature. This editorial reviews the available human data addressing research questions originally proposed by the white paper, including determining the optimal method of access for NOTES, developing safe methods of lumenal closure, suturing and anastomotic devices, advanced multitasking platforms, addressing the risk of infection, managing complications, addressing challenges with visualization, and training for NOTES procedures. An analysis of the literature reveals that so far transvaginal access and closure appear to be the most feasible techniques for NOTES, with a limited, but growing transgastric, transrectal, and transesophageal NOTES experience in humans. The theoretically increased risk of infection as a result of NOTES procedures has not been substantiated in transvaginal and transgastric procedures so far. Development of suturing and anastomotic devices and advanced platforms for NOTES has progressed slowly, with limited clinical data on their use so far. Data on the optimal management and incidence of intraoperative complications remain sparse, although possible factors contributing to complications are discussed. Finally, this editorial discusses the likely direction of future NOTES development and its possible role in clinical practice. PMID:21483624

  11. Status of Progress Made Toward Preliminary Design Concepts for the Inventory in Select Media for DOE-Managed HLW/SNF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matteo, Edward N.; Hardin, Ernest L.; Hadgu, Teklu

    As the title suggests, this report provides a summary of the status and progress for the Preliminary Design Concepts Work Package. Described herein are design concepts and thermal analysis for crystalline and salt host media. The report concludes that thermal management of defense waste, including the relatively small subset of high thermal output waste packages, is readily achievable. Another important conclusion pertains to engineering feasibility, and design concepts presented herein are based upon established and existing elements and/or designs. The multipack configuration options for the crystalline host media pose the greatest engineering challenges, as these designs involve large, heavy wastemore » packages that pose specific challenges with respect to handling and emplacement. Defense-related Spent Nuclear Fuel (DSNF) presents issues for post-closure criticality control, and a key recommendation made herein relates to the need for special packaging design that includes neutron-absorbing material for the DSNF. Lastly, this report finds that the preliminary design options discussed are tenable for operational and post-closure safety, owing to the fact that these concepts have been derived from other published and well-studied repository designs.« less

  12. Development of Numerical Extended Hydrodynamics for Transition-Regime Non-Equilibrium Flows Encountered in Semiconductor Manufacturing Processes

    NASA Technical Reports Server (NTRS)

    Groth, Clinton P. T.; Roe, Philip L.

    1998-01-01

    Six months of funding was received for the proposed three year research program (funding for the period from March 1, 1997 to August 31, 1997). Although the official starting date for the project was March 1, 1997, no funding for the project was received until July 1997. In the funded research period, considerable progress was made on Phase I of the proposed research program. The initial research efforts concentrated on applying the 10-, 20-, and 35-moment Gaussian-based closures to a series of standard two-dimensional non-reacting single species test flow problems, such as the flat plate, couette, channel, and rearward facing step flows, and to some other two-dimensional flows having geometries similar to those encountered in chemical-vapor deposition (CVD) reactors. Eigensystem analyses for these systems for the case of two spatial dimensions was carried out and efficient formulations of approximate Riemann solvers have been formulated using these eigenstructures. Formulations to include rotational non-equilibrium effects into the moment closure models for the treatment of polyatomic gases were explored, as the original formulations of the closure models were developed strictly for gases composed of monatomic molecules. The development of a software library and computer code for solving relaxing hyperbolic systems in two spatial dimensions of the type arising from the closure models was also initiated. The software makes use of high-resolution upwind finite-volumes schemes, multi-stage point implicit time stepping, and automatic adaptive mesh refinement (AMR) to solve the governing conservation equations for the moment closures. The initial phase of the code development was completed and a numerical investigation of the solutions of the 10-moment closure model for the simple two-dimensional test cases mentioned above was initiated. Predictions of the 10-moment model were compared to available theoretical solutions and the results of direct-simulation Monte Carlo (DSMC) calculations. The first results of this study were presented at a meeting last year.

  13. Improving Freight Fire Safety: Analysis and Testing of Real Engine Conditions to Progress Development of Mist-controlling Additives for Fire Mitigation

    DOT National Transportation Integrated Search

    2009-12-01

    The formation of a fuel mist resulting from high shear stresses acting on the fuel during violent sloshing and tank rupture under the energy of a crash severely increases the occurrence and intensity of fires in transportation related accidents. In o...

  14. Prototype solar heating and combined heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Schedules and technical progress in the development of eight prototype solar heating and combined solar heating and cooling systems are reported. Particular emphasis is given to the analysis and preliminary design for the cooling subsystem, and the setup and testing of a horizontal thermal energy storage tank configuration and collector shroud evaluation.

  15. Traction-assisted Internal Negative Pressure Wound Therapy With Bridging Retention Sutures to Facilitate Staged Closure of High-risk Wounds Under Tension.

    PubMed

    DeFazio, Michael V; Economides, James M; Anghel, Ersilia L; Mathis, Ryan K; Barbour, John R; Attinger, Christopher E

    2017-10-01

    Loss of domain often complicates attempts at delayed wound closure in regions of high tension. Wound temporization with traction-assisted internal negative pressure wound therapy (NPWT), using bridging retention sutures, can minimize the effects of edema and elastic recoil that contribute to progressive tissue retraction over time. The investigators evaluated the safety and efficacy of this technique for complex wound closure. Between May 2015 and November 2015, 18 consecutive patients underwent staged reconstruction of complex and/or contaminated soft tissue defects utilizing either conventional NPWT or modified NPWT with instillation and continuous dermatotraction via bridging retention sutures. Instillation of antimicrobial solution was reserved for wounds containing infected/exposed hardware or prosthetic devices. Demographic data, wound characteristics, reconstructive outcomes, and complications were reviewed retrospectively. Eighteen wounds were treated with traction-assisted internal NPWT using the conventional (n = 11) or modified instillation (n = 7) technique. Defects involved the lower extremity (n = 14), trunk (n = 3), and proximal upper extremity (n = 1), with positive cultures identified in 12 wounds (67%). Therapy continued for 3 to 8 days (mean, 4.3 days), resulting in an average wound surface area reduction of 78% (149 cm² vs. 33 cm²) at definitive closure. Seventeen wounds (94%) were closed directly, whereas the remaining defect required coverage with a local muscle flap and skin graft. At final follow-up (mean, 12 months), 89% of wounds remained closed. In 2 patients with delayed, recurrent periprosthetic infection (mean, 7.5 weeks), serial debridement/hardware removal mandated free tissue transfer for composite defect reconstruction. Traction-assisted internal NPWT provides a safe and effective alternative to reduce wound burden and facilitate definitive closure in cases where delayed reconstruction of high-tension wounds is planned.

  16. Comparison of two turbulence models in simulating an axisymmetric jet evolving into a tank

    NASA Astrophysics Data System (ADS)

    Zidouni Kendil, F.; Danciu, D.-V.; Lucas, D.; Bousbia Salah, A.; Mataoui, A.

    2011-12-01

    Experiments and computational fluid dynamics (CFD) simulations have been carried out to investigate a turbulent water jet plunging into a tank filled with the same liquid. To avoid air bubble entrainment which may be caused by surface instabilities, the free falling length of the jet is set to zero. For both impinging region and recirculation zone, measurements are made using Particle Image Velocimetry (PIV). Instantaneous- and time-averaged velocity fields are obtained. Numerical data is obtained on the basis of both κ - epsilon and SSG (Speziale, Sarkar and Gatski) of Reynolds Stresses Turbulent Model (RSM) in three dimensional frame and compared to experimental results via the axial velocity and turbulent kinetic energy. For axial distances lower than 5cm from the jet impact point, the axial velocity matches well the measurements, using both models. A progressive difference is found near the jet for higher axial distances from the jet impact point. Nevertheless, the turbulence kinetic energy agrees very well with the measurements when applying the SSG-RSM model for the lower part of the tank, whereas it is underestimated in the upper region. Inversely, the κ - epsilon model shows better results in the upper part of the water tank and underestimates results for the lower part of the water tank. From the overall results, it can be concluded that, for single phase flow, the κ - epsilon model describes well the average axial velocity, whereas the turbulence kinetic energy is better represented by the SSG-RSM model.

  17. HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BERGMAN TB

    2011-01-14

    Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the {approx}200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of themore » River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were signed by the Parties on October 26,2010, and are now in the process of being implemented.« less

  18. Significant volume reduction of tank waste by selective crystallization: 1994 Annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herting, D.L.; Lunsford, T.R.

    1994-09-27

    The objective of this technology task plan is to develop and demonstrate a scaleable process of reclaim sodium nitrate (NaNO{sub 3}) from Hanford waste tanks as a clean nonradioactive salt. The purpose of the so-called Clean Salt Process is to reduce the volume of low level waste glass by as much as 70%. During the reporting period of October 1, 1993, through May 31, 1994, progress was made on four fronts -- laboratory studies, surrogate waste compositions, contracting for university research, and flowsheet development and modeling. In the laboratory, experiments with simulated waste were done to explore the effects ofmore » crystallization parameters on the size and crystal habit of product NaNO{sub 3} crystals. Data were obtained to allows prediction of decontamination factor as a function of solid/liquid separation parameters. Experiments with actual waste from tank 101-SY were done to determine the extent of contaminant occlusions in NaNO{sub 3} crystals. In preparation for defining surrogate waste compositions, single shell tanks were categorized according to the weight percent NaNO{sub 3} in each tank. A detailed process flowsheet and computer model were created using the ASPENPlus steady state process simulator. This is the same program being used by the Tank Waste Remediation System (TWRS) program for their waste pretreatment and disposal projections. Therefore, evaluations can be made of the effect of the Clean Salt Process on the low level waste volume and composition resulting from the TWRS baseline flowsheet. Calculations, using the same assumptions as used for the TWRS baseline where applicable indicate that the number of low level glass vaults would be reduced from 44 to 16 if the Clean Salt Process were incorporated into the baseline flowsheet.« less

  19. Non-destructive vacuum decay method for pre-filled syringe closure integrity testing compared with dye ingress testing and high-voltage leak detection.

    PubMed

    Simonetti, Andrea; Amari, Filippo

    2015-01-01

    In reaction to the limitations of the traditional sterility test methods, in 2008, the U.S. Food and Drug Administration issued the guidance "Container and Closure System Integrity Testing in Lieu of Sterility Testing as a Component of the Stability Protocol for Sterile Products" encouraging sterile drug manufacturers to use properly validated physical methods, apart from conventional microbial challenge testing, to confirm container closure integrity as part of the stability protocol. The case study presented in this article investigated the capability of four container closure integrity testing methods to detect simulated defects of different sizes and types on glass syringes, prefilled both with drug product intended for parenteral administration and sterile water. The drug product was a flu vaccine (Agrippal, Novartis Vaccines, Siena, Italy). Vacuum decay, pharmacopoeial dye ingress test, Novartis specific dye ingress test, and high-voltage leak detection were, in succession, the methods involved in the comparative studies. The case study execution was preceded by the preparation of two independent sets of reference prefilled syringes, classified, respectively, as examples of conforming to closure integrity requirements (negative controls) and as defective (positive controls). Positive controls were, in turn, split in six groups, three of with holes laser-drilled through the prefilled syringe glass barrel, while the other three with capillary tubes embedded in the prefilled syringe plunger. These reference populations were then investigated by means of validated equipment used for container closure integrity testing of prefilled syringe commercial production; data were collected and analyzed to determine the detection rate and the percentage of false results. Results showed that the vacuum decay method had the highest performance in terms of detection sensitivity and also ensured the best reliability and repeatability of measurements. An innovative technical solution, preventing possible prefilled syringe plunger movement during container closure integrity testing execution, is presented as well. The growing need to meet sterile drug products' regulatory, quality, and safety expectations has progressively driven new developments and improvements both in container closure integrity testing methods and in the respective equipment, over the last years. Indeed, container closure integrity testing establishes the container closure system capability to provide required protection to the drug product and to demonstrate maintenance of product sterility over its shelf life. This article describes the development of four container closure integrity testing approaches for the evaluation of glass prefilled syringe closure integrity, including two destructive (pharmacopoeial and Novartis specific dye ingress test) and two non-destructive (vacuum decay and high-voltage leak detection) methods. The important finding from the validation of comparative studies was that the vacuum decay method resulted in the most effective, reliable and repeatable detection of defective samples, whether the defect was exposed to sterile water, to drug product, or to air. Complete sets of known defects were created for this purpose (5 μm, 10 μm, 20 μm certified leakages by laser drilled holes and capillary tubes). All investigations and studies were conducted at Bonfiglioli Engineering S.r.l. (Vigarano Pieve, Ferrara, Italy) and at Novartis Vaccines (Sovicille, Siena, Italy). © PDA, Inc. 2015.

  20. International Space Station (ISS) Gas Logistics Planning in the Post Shuttle Era

    NASA Technical Reports Server (NTRS)

    Leonard, Daniel J.; Cook, Anthony J.; Lehman, Daniel A.

    2011-01-01

    Over its life the International Space Station (ISS) has received gas (nitrogen, oxygen, and air) from various sources. Nitrogen and oxygen are used in the cabin to maintain total pressure and oxygen partial pressures within the cabin. Plumbed nitrogen is also required to support on-board experiments and medical equipment. Additionally, plumbed oxygen is required to support medical equipment as well as emergency masks and most importantly EVA support. Gas are supplied to ISS with various methods and vehicles. Vehicles like the Progress and ATV deliver nitrogen (both as a pure gas and as air) and oxygen via direct releases into the cabin. An additional source of nitrogen and oxygen is via tanks on the ISS Airlock. The Airlock nitrogen and oxygen tanks can deliver to various users via pressurized systems that run throughout the ISS except for the Russian segment. Metabolic oxygen is mainly supplied via cabin release from the Elektron and Oxygen Generator Assembly (OGA), which are water electrolyzers. As a backup system, oxygen candles (Solid Fuel Oxygen Generators-SFOGs) supply oxygen to the cabin as well. In the past, a major source of nitrogen and oxygen has come from the Shuttle via both direct delivery to the cabin as well as to recharge the ISS Airlock tanks. To replace the Shuttle capability to recharge the ISS Airlock tanks, a new system was developed called Nitrogen/Oxygen Recharge System (NORS). NIORS consists of high pressure (7000 psi) tanks which recharge the ISS Airlock tanks via a blowdown fill for both nitrogen and oxygen. NORS tanks can be brought up on most logistics vehicles such as the HTV, COTS, and ATV. A proper balance must be maintained to insure sufficient gas resources are available on-orbit so that all users have the required gases via the proper delivery method (cabin and/or plumbed).

  1. Test Plan - Solids Accumulation Scouting Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duignan, M. R.; Steeper, T. J.; Steimke, J. L.

    This plan documents the highlights of the Solids Accumulations Scouting Studies test; a project, from Washington River Protection Solutions (WRPS), that began on February 1, 2012. During the last 12 weeks considerable progress has been made to design and plan methods that will be used to estimate the concentration and distribution of heavy fissile solids in accumulated solids in the Hanford double-shell tank (DST) 241-AW-105 (AW-105), which is the primary goal of this task. This DST will be one of the several waste feed delivery staging tanks designated to feed the Pretreatment Facility (PTF) of the Waste Treatment and Immobilizationmore » Plant (WTP). Note that over the length of the waste feed delivery mission AW-105 is currently identified as having the most fill empty cycles of any DST feed tanks, which is the reason for modeling this particular tank. At SRNL an existing test facility, the Mixing Demonstration Tank, which will be modified for the present work, will use stainless steel particles in a simulant that represents Hanford waste to perform mock staging tanks transfers that will allow solids to accumulate in the tank heel. The concentration and location of the mock fissile particles will be measured in these scoping studies to produce information that will be used to better plan larger scaled tests. Included in these studies is a secondary goal of developing measurement methods to accomplish the primary goal. These methods will be evaluated for use in the larger scale experiments. Included in this plan are the several pretest activities that will validate the measurement techniques that are currently in various phases of construction. Aspects of each technique, e.g., particle separations, volume determinations, topographical mapping, and core sampling, have been tested in bench-top trials, as discussed herein, but the actual equipment to be employed during the full test will need evaluation after fabrication and integration into the test facility.« less

  2. Cleanup of a jet fuel spill

    NASA Astrophysics Data System (ADS)

    Fesko, Steve

    1996-11-01

    Eaton operates a corporate aircraft hanger facility in Battle Creek, Michigan. Tests showed that two underground storage tanks leaked. Investigation confirmed this release discharged several hundred gallons of Jet A kerosene into the soil and groundwater. The oil moved downward approximately 30 feet and spread laterally onto the water table. Test results showed kerosene in the adsorbed, free and dissolved states. Eaton researched and investigated three clean-up options. They included pump and treat, dig and haul and bioremediation. Jet fuel is composed of readily biodegradable hydrocarbon chains. This fact coupled with the depth to groundwater and geologic setting made bioremediation the low cost and most effective alternative. A recovery well was installed at the leading edge of the dissolved contamination. A pump moved water from this well into a nutrient addition system. Nutrients added included nitrogen, phosphorous and potassium. Additionally, air was sparged into the water. The water was discharged into an infiltration gallery installed when the underground storage tanks were removed. Water circulated between the pump and the infiltration basin in a closed loop fashion. This oxygenated, nutrient rich water actively and aggressively treated the soils between the bottom of the gallery and the top of the groundwater and the groundwater. The system began operating in August of 1993 and reduced jet fuel to below detection levels. In August of 1995 The State of Michigan issued a clean closure declaration to the site.

  3. Deflection Analysis of the Space Shuttle External Tank Door Drive Mechanism

    NASA Technical Reports Server (NTRS)

    Tosto, Michael A.; Trieu, Bo C.; Evernden, Brent A.; Hope, Drew J.; Wong, Kenneth A.; Lindberg, Robert E.

    2008-01-01

    Upon observing an abnormal closure of the Space Shuttle s External Tank Doors (ETD), a dynamic model was created in MSC/ADAMS to conduct deflection analyses of the Door Drive Mechanism (DDM). For a similar analysis, the traditional approach would be to construct a full finite element model of the mechanism. The purpose of this paper is to describe an alternative approach that models the flexibility of the DDM using a lumped parameter approximation to capture the compliance of individual parts within the drive linkage. This approach allows for rapid construction of a dynamic model in a time-critical setting, while still retaining the appropriate equivalent stiffness of each linkage component. As a validation of these equivalent stiffnesses, finite element analysis (FEA) was used to iteratively update the model towards convergence. Following this analysis, deflections recovered from the dynamic model can be used to calculate stress and classify each component s deformation as either elastic or plastic. Based on the modeling assumptions used in this analysis and the maximum input forcing condition, two components in the DDM show a factor of safety less than or equal to 0.5. However, to accurately evaluate the induced stresses, additional mechanism rigging information would be necessary to characterize the input forcing conditions. This information would also allow for the classification of stresses as either elastic or plastic.

  4. Corrective Action Investigation Plan for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada (Rev. No.: 0, August 2002)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Offices's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 127 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 127 is located on the Nevada Test Site approximately 65 miles northwest of Las Vegas, Nevada. This CAU is comprised of 12 Corrective Action Sites (CASs) located at Test Cell C; the Engine Maintenance, Assembly, and Disassembly (E-MAD) Facility; the X-Tunnel in Area 25; the Pluto Disassembly Facility; themore » Pluto Check Station; and the Port Gaston Training Facility in Area 26. These CASs include: CAS 25-01-05, Aboveground Storage Tank (AST); CAS 25-02-02, Underground Storage Tank (UST); CAS 25-23-11, Contaminated Materials; CAS 25-12-01, Boiler; CAS 25-01-06, AST; CAS 25-01-07, AST; CAS 25-02-13, UST; CAS 26- 01-01, Filter Tank (Rad) and Piping; CAS 26-01-02, Filter Tank (Rad); CAS 26-99-01, Radioactively Contaminated Filters; CAS 26-02-01, UST; CAS 26-23-01, Contaminated Liquids Spreader. Based on site history, process knowledge, and previous field efforts, contaminants of potential concern for CAU 127 include radionuclides, metals, total petroleum hydrocarbons, volatile organic compounds, asbestos, and polychlorinated biphenyls. Additionally, beryllium may be present at some locations. The sources of potential releases are varied, but releases of contaminated liquids may have occurred and may have migrated into and impacted soil below and surrounding storage vessels at some of the CASs. Also, at several CASs, asbestos-containing materials may be present on the aboveground structures and may be friable. Exposure pathways are limited to ingestion, inhalation, and dermal contact (adsorption) of soils/sediments or liquids, or inhalation of contaminants by site workers due to disturbance of contaminated materials. Future land-use scenarios limit subsequent uses of the CASs to various nonresidential (i.e., industrial) activities. Field activities will consist of radiological walkover and screening surveys, and field-screening and collecting of both tank content and soil samples, and further sample testing as appropriate. A two-step data quality objective strategy will be followed: (1) Phase I will be to collect environmental samples for laboratory analysis to confirm the presence or absence of contaminants at concentrations exceeding preliminary action levels; and (2) Phase II will be to collect additional environmental samples for laboratory analysis to determine the extent of contamination identified in Phase I. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  5. Wine oxidation and the role of cork.

    PubMed

    Karbowiak, Thomas; Gougeon, Régis D; Alinc, Jean-Baptiste; Brachais, Laurent; Debeaufort, Frédéric; Voilley, Andrée; Chassagne, David

    2010-01-01

    The present review aims to show the state of the art of oxidation mechanisms occurring especially in white wines by taking into account knowledge from different fields in relation to the subject. It is therefore divided into three main parts. First, the mechanisms of oxidation relevant to white wine are discussed in the light of recent scientific literature. Next, the phenomenon of oxygen solubility in wine during the winemaking process, and in particular during bottling is stated theoretically as well as practically. Finally, the aspect of wine conservation after bottling is examined with respect to mass transfers which may occur through the closure, with a special emphasis on cork. Currently, specific physico-chemical properties still make cork closures the most important closure type used for the wine market, and especially for high quality wines. This final section will also include a review of studies performed on this subject, which have been analyzed in detail from a theoretical mass transfer point of view, in order to assess the extent to which the proposed scientific tools and the observed tendencies are relevant to progress in the understanding of the impact of this parameter on the behavior of a wine.

  6. Assessment of dynamic closure for premixed combustion large eddy simulation

    NASA Astrophysics Data System (ADS)

    Langella, Ivan; Swaminathan, Nedunchezhian; Gao, Yuan; Chakraborty, Nilanjan

    2015-09-01

    Turbulent piloted Bunsen flames of stoichiometric methane-air mixtures are computed using the large eddy simulation (LES) paradigm involving an algebraic closure for the filtered reaction rate. This closure involves the filtered scalar dissipation rate of a reaction progress variable. The model for this dissipation rate involves a parameter βc representing the flame front curvature effects induced by turbulence, chemical reactions, molecular dissipation, and their interactions at the sub-grid level, suggesting that this parameter may vary with filter width or be a scale-dependent. Thus, it would be ideal to evaluate this parameter dynamically by LES. A procedure for this evaluation is discussed and assessed using direct numerical simulation (DNS) data and LES calculations. The probability density functions of βc obtained from the DNS and LES calculations are very similar when the turbulent Reynolds number is sufficiently large and when the filter width normalised by the laminar flame thermal thickness is larger than unity. Results obtained using a constant (static) value for this parameter are also used for comparative evaluation. Detailed discussion presented in this paper suggests that the dynamic procedure works well and physical insights and reasonings are provided to explain the observed behaviour.

  7. KSC-2011-3050

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  8. KSC-2011-3045

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  9. KSC-2011-3052

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  10. KSC-2011-3046

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lowered into high bay-1 between the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  11. 46 CFR 30.10-37 - Keel laying date-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Keel laying date-TB/ALL. 30.10-37 Section 30.10-37 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-37 Keel laying date—TB/ALL. The term keel laying date means the date upon which progressive...

  12. 46 CFR 30.10-37 - Keel laying date-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Keel laying date-TB/ALL. 30.10-37 Section 30.10-37 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-37 Keel laying date—TB/ALL. The term keel laying date means the date upon which progressive...

  13. 46 CFR 30.10-37 - Keel laying date-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Keel laying date-TB/ALL. 30.10-37 Section 30.10-37 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-37 Keel laying date—TB/ALL. The term keel laying date means the date upon which progressive...

  14. 46 CFR 30.10-37 - Keel laying date-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Keel laying date-TB/ALL. 30.10-37 Section 30.10-37 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-37 Keel laying date—TB/ALL. The term keel laying date means the date upon which progressive...

  15. 46 CFR 30.10-37 - Keel laying date-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Keel laying date-TB/ALL. 30.10-37 Section 30.10-37 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-37 Keel laying date—TB/ALL. The term keel laying date means the date upon which progressive...

  16. Characterization engineering status report october 1998 - december 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BOGER, R.M.

    1999-05-13

    Characterization Engineering (CE) continues to make progress in support of the project goal of characterizing the Hanford high-level waste tanks. Two core sampling systems were operational during this reporting period-push mode core sampling system No. 1 and rotary mode core sampling system No. 4. The availability average for core sampling systems No. 1 , No. 3 and No. 4, combined, was 45 percent, down from 79percent for the previous quarter and 58 percent for FY 1998. System No. 2 did not have scope during the quarter, and availability was not hacked. System No. 3 was out of service the entiremore » quarter for corrective maintenance. Two tanks were core sampled during the reporting period, and 24 samples were retrieved. Core sample recovery increased slightly during the quarter. System No. 1 average sample recovery increased from 80percent to 81 percent, The rotary mode core sampling average recovery increased to 62 percent from 55 percent for the previous quarter. sampling six tanks, one more than scheduled. Vapor Sampling was utilized in support of the sluicing of tank 241-C-106 and for emissions monitoring of three exhaust stacks. Increased support was provided for Vapor Sampling the Standard Hydrogen Monitoring Systems. The sampling was necessary due to freezing problems with the field-installed systems. Preparations are continuing for the Light-Duty Utility Arm (LDUA) deployment with configuration and minor hardware upgrades. The LDUA Operational Readiness Review continues. The oversight of the Nested, Fixed-Depth Sampler system development has started to increase in order to ensure that a usable system is received when the project is completed. To improve configuration control, 92 drawing sheet revisions were completed along with the generation of nine new drawing sheets. The number of outstanding Engineering Change Notices increased slightly because of the addition of more drawings into the project. continues to develop. Organizational responsibilities are being identified and documented as well as the scope and deliverables. Finishing Plant was completed, and the final reviews to authorize starting work have begun. Significant progress was made in other areas as well. Grab Sampling completed The stewardship of the Long Length Contaminated Equipment Removal equipment The engineering and work planning for opening tank 241-2361 at the Plutonium.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    The following site closure activities were performed at the 34 Corrective Action Sites (CASs) comprising Corrective Action Unit (CAU) 417 and are documented in this report: (1) No closure action was taken at 13 CASs (17 sites): 58-05-01,58-07-01,58-05-04, 58-09-05 (Mud Pits C and D only), 58-35-01,58-05-02,58-09-06 (Mud Pits A, B, C, and D), 58-10-06,58-19-01,58-35-02,58-44-04,58-05-04, and 58-09-03 (Mud Pit E only). (2) Housekeeping activities, collecting scrap materials, and transporting to approved landfill sites at the NTS were used to close seven CASs: 58-44-01,58-44-02,58-44-05, 58-98-03,58-98-01,58-98-02, and 58-98-04. (3) Two CASs (58-05-03 and 58-99-01) were closed by excavation and removal of USTs. (4)more » Two septic tanks (CASs 58-05-05 and 58-05-06) were closed by backfilling with clean fill. (5) Site posting with above-grade monuments and attached warning signs and land-use restrictions were used to close seven CASs (nine sites): 58-09-02,58-09-05 (Mud Pit E only), 58-09-06 (Mud Pit E only), 58-10-01,58-25-01,58-09-03 (Mud Pits A, B, and D), and 58-10-05. (6) Clean closure by excavation soil with TPH levels greater than the NDEP action level of 100 mg/kg and limited regrading was used to close five CASs: 58-10-03,58-44-06, 58-44-03,58-10-02, and 58-10-04. (7) Construction of engineered covers was used to close in place two CASs: 58-09-01 and 58-09-03 (Mud Pit C only). Following construction, a fence was constructed around each cover to prevent damage to the cover or intrusion by wildlife.« less

  18. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peurrung, L.M.

    1999-06-30

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanmore » Up, and Health Effects.« less

  19. Preparing America for Deep Space Exploration Episode 11: Committed to Exploration

    NASA Image and Video Library

    2015-12-09

    Engineers around the country are making progress developing NASA’s Space Launch System, Orion spacecraft and the ground systems at Kennedy Space Center in Florida needed to send astronauts on missions to deep space destinations. Between July and September, progress continued as pieces of Orion’s crew module and the SLS core stage tanks were welded together at NASA’s Michoud Assembly Facility in New Orleans, modifications were made to the mobile launcher at Kennedy, astronauts tested techniques for exiting Orion after a mission, and an RS-25 engine was tested at Stennis Space Center in Mississippi.

  20. Sustained Progress: New Findings about the Effectiveness and Operation of Small Public High Schools of Choice in New York City

    ERIC Educational Resources Information Center

    Bloom, Howard S.; Unterman, Rebecca

    2013-01-01

    In 2002, New York City embarked on an ambitious and wide-ranging series of education reforms. At the heart of its high school reforms were three interrelated changes: the institution of a district wide high school choice process for all rising ninth-graders, the closure of 31 large, failing high schools with an average graduation rate of 40…

  1. Sealing Mustard Jars with Plastic Linerless Closures

    DTIC Science & Technology

    1985-10-01

    Recommendations 15 Literature cited 16 Appendices: A . Levels of Packaging 19 B. Value Engineering Correspondence 2 3 V ILLUSTRATIVE DATA Page...Analytical Progress Total Dietary Fiber Another Look, 1984, Vol 2,■No. 1, Minneapolis, MN 16 APPENDIXES A : Levels of Packaging B: Value...Engineering Correspondence 17 APPENDIX A : Levels of Packaging 19 APPENDIX A : Levels of Packaging Excerpt from: AR 700-15/NAVSUPINST 4030.28B/AFR 71~6

  2. Lamellipodia-based migrations of larval epithelial cells are required for normal closure of the adult epidermis of Drosophila

    PubMed Central

    Bischoff, Marcus

    2012-01-01

    Cell migrations are an important feature of animal development. They are, furthermore, essential to wound healing and tumour progression. Despite recent progress, it is still mysterious how cell migration is spatially and temporally regulated during morphogenesis and how cell migration is coordinated with other cellular behaviours to shape tissues and organs. The formation of the abdominal epithelium of Drosophila during metamorphosis provides an attractive system to study morphogenesis. Here, the diploid adult histoblasts replace the polyploid larval epithelial cells (LECs). Using in vivo 4D microscopy, I show that, besides apical constriction and apoptosis, the LECs undergo extensive coordinated migrations. The migrations follow a transition from a stationary (epithelial) to a migratory mode. The migratory behaviour is stimulated by autocrine Dpp signalling. Directed apical lamellipodia-like protrusions propel the cells. Initially, planar cell polarity determines the orientation of LEC migration. While LECs are migrating they also constrict apically, and changes in activity of the small GTPase Rho1 can favour one behaviour over the other. This study shows that the LECs play a more active role in morphogenesis than previously thought, with their migrations contributing to abdominal closure. It furthermore provides insights into how the migratory behaviour of cells is regulated during morphogenesis. PMID:22230614

  3. Evaluation of Technetium Getters to Improve the Performance of Cast Stone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neeway, James J.; Qafoku, Nikolla P.; Serne, R. Jeffrey

    2015-11-01

    Cast Stone has been selected as the preferred waste form for solidification of aqueous secondary liquid effluents from the Hanford Tank Waste Treatment and Immobilization Plant (WTP) process condensates and low-activity waste (LAW) melter off-gas caustic scrubber effluents. Cast Stone is also being evaluated as a supplemental immobilization technology to provide the necessary LAW treatment capacity to complete the Hanford tank waste cleanup mission in a timely and cost effective manner. One of the major radionuclides that Cast Stone has the potential to immobilize is technetium (Tc). The mechanism for immobilization is through the reduction of the highly mobile Tc(VII)more » species to the less mobile Tc(IV) species by the blast furnace slag (BFS) used in the Cast Stone formulation. Technetium immobilization through this method would be beneficial because Tc is one of the most difficult contaminants to address at the U.S. Department of Energy (DOE) Hanford Site due to its complex chemical behavior in tank waste, limited incorporation in mid- to high-temperature immobilization processes (vitrification, steam reformation, etc.), and high mobility in subsurface environments. In fact, the Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC&WM EIS) identifies technetium-99 ( 99Tc) as one of the radioactive tank waste components contributing the most to the environmental impact associated with the cleanup of the Hanford Site. The TC&WM EIS, along with an earlier supplemental waste-form risk assessment, used a diffusion-limited release model to estimate the release of different contaminants from the WTP process waste forms. In both of these predictive modeling exercises, where effective diffusivities based on grout performance data available at the time, groundwater at the 100-m down-gradient well exceeded the allowable maximum permissible concentrations for 99Tc. (900 pCi/L). Recent relatively short-term (63 day) leach tests conducted on both LAW and secondary waste Cast Stone monoliths indicated that 99Tc diffusivities were at or near diffusivities where the groundwater at the 100-m down-gradient well would exceed the allowable maximum permissible 99Tc concentrations. There is, therefore, a need and an opportunity to improve the retention of Tc in the Cast Stone waste form. One method to improve the performance of the Cast Stone waste form is through the addition of “getters” that selectively sequester Tc inside Cast Stone.« less

  4. RECOMMENDATIONS FOR SAMPLING OF TANK 18 IN F TANK FARM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shine, G.

    2009-12-14

    Representative sampling is required for characterization of the residual floor material in Tank 18 prior to operational closure. Tank 18 is an 85-foot diameter, 34-foot high carbon steel tank with nominal operating volume of 1,300,000 gallons. It is a Type IV tank, and has been in service storing radioactive materials since 1959. Recent mechanical cleaning of the tank removed all mounds of material. Anticipating a low level of solids in the residual material, Huff and Thaxton [2009] developed a plan to sample the material during the final clean-up process while it would still be resident in sufficient quantities to supportmore » analytical determinations in four quadrants of the tank. Execution of the plan produced fewer solids than expected to support analytical determinations in all four quadrants. Huff and Thaxton [2009] then restructured the plan to characterize the residual floor material separately in the North and the South regions: two 'hemispheres.' This document provides sampling recommendations to complete the characterization of the residual material on the tank bottom following the guidance in Huff and Thaxton [2009] to split the tank floor into a North and a South hemisphere. The number of samples is determined from a modification of the formula previously published in Edwards [2001] and the sample characterization data for previous sampling of Tank 18 described by Oji [2009]. The uncertainty is quantified by an upper 95% confidence limit (UCL95%) on each analyte's mean concentration in Tank 18. The procedure computes the uncertainty in analyte concentration as a function of the number of samples, and the final number of samples is determined when the reduction in the uncertainty from an additional sample no longer has a practical impact on results. The characterization of the full suite of analytes in the North hemisphere is currently supported by a single Mantis rover sample obtained from a compact region near the center riser. A floor scrape sample was obtained from a compact region near the northeast riser and has been analyzed for a shortened list of key analytes. Since the unused portion of the floor scrape sample material is archived and available in sufficient quantity, additional analyses need to be performed to complete results for the full suite of constituents. The characterization of the full suite of analytes in the South hemisphere is currently supported by a single Mantis rover sample; there have been no floor scrape samples previously taken from the South hemisphere. The criterion to determine the number of additional samples was based on the practical reduction in the uncertainty when a new sample is added. This was achieved when five additional samples are obtained. In addition, two archived samples will be used if a contingency such as failing to demonstrate the comparability of the Mantis samples to the floor scrape samples occurs. To complete sampling of the Tank 18 residual floor material, three additional samples should be taken from the North hemisphere and four additional samples should be taken from the South hemisphere. One of the samples from each hemisphere will be archived in case of need. Two of the three additional samples from the North hemisphere and three of the four additional samples from the South hemisphere will be analyzed. Once the results are available, differences between the Mantis and three floor scrape samples (the sample previously obtained near NE riser plus the two additional samples that will be analyzed) results will be evaluated. If there are no statistically significant analyte concentration differences between the Mantis and floor scrape samples, those results will be combined and then UCL95%s will be calculated. If the analyte concentration differences between the Mantis and floor scrape samples are statistically significant, the UCL95%s will be calculated without the Mantis sample results. If further reduction in the upper confidence limits is needed and can be achieved by the addition of the archived samples, they will be analyzed and included in the statistical computations. Initially, the analyte concentrations in the residual material on the floor of Tank 18 will be determined separately in the North and the South hemispheres. However, if final sampling results show that differences between the North and South samples are consistent within sampling variation, then the final computations can be based on consolidating all sample results from the tank floor. Recommended locations may be subject to physical tank access and sampling constraints for the additional samples. The recommendations have been discussed in Section 4 and are based on partitioning the Tank 18 floor into an inner and an outer ring and six 60{sup o} sectors depicted in Figure 1. The location of the border between the inner and outer rings is based on dividing the residual material into two approximately equal volumes.« less

  5. The safe removal of frozen air from the annulus of an LH2 storage tank

    NASA Astrophysics Data System (ADS)

    Krenn, A.; Starr, S.; Youngquist, R.; Nurge, M.; Sass, J.; Fesmire, J.; Cariker, C.; Bhattacharya, A.

    2015-12-01

    Large Liquid Hydrogen (LH2) storage tanks are vital infrastructure for NASA. Eventually, air may leak into the evacuated and perlite filled annular region of these tanks. Although the vacuum level is monitored in this region, the extremely cold temperature causes all but the helium and neon constituents of air to freeze. A small, often unnoticeable pressure rise is the result. As the leak persists, the quantity of frozen air increases, as does the thermal conductivity of the insulation system. Consequently, a notable increase in commodity boil-off is often the first indicator of an air leak. Severe damage can result from normal draining of the tank. The warming air will sublimate which will cause a pressure rise in the annulus. When the pressure increases above the triple point, the frozen air will begin to melt and migrate downward. Collection of liquid air on the carbon steel outer shell may chill it below its ductility range, resulting in fracture. In order to avoid a structural failure, as described above, a method for the safe removal of frozen air is needed. A thermal model of the storage tank has been created using SINDA/FLUINT modelling software. Experimental work is progressing in an attempt to characterize the thermal conductivity of a perlite/frozen nitrogen mixture. A statistical mechanics model is being developed in parallel for comparison to experimental work. The thermal model will be updated using the experimental/statistical mechanical data, and used to simulate potential removal scenarios. This paper will address methodologies and analysis techniques for evaluation of two proposed air removal methods.

  6. A water blown urethane insulation for use in cryogenic environments

    NASA Technical Reports Server (NTRS)

    Blevins, Elana; Sharpe, Jon

    1995-01-01

    Thermal Protection Systems (TPS) of NASA's Space Shuttle External Tank include polyurethane and polyisocyanurate modified polyurethane foam insulations. These insulations, currently foamed with CFC 11 blowing agent, serve to maintain cryogenic propellant quality, maintain the external tank structural temperature limits, and minimize the formation of ice and frost that could potentially damage the ceramic insulation on the space shuttle orbiter. During flight the external tank insulations are exposed to mechanical, thermal and acoustical stresses. TPS must pass cryogenic flexure and substrate adhesion tests at -253 C, aerothermal and radiant heating tests at fluxes up to approximately 14 kilowatts per square meter, and thermal conductivity tests at cryogenic and elevated temperatures. Due to environmental concerns, the polyurethane insulation industry and the External Tank Project are tasked with replacing CFC 11. The flight qualification of foam insulations employing HCFC 141b as a foaming agent is currently in progress; HCFC 141b blown insulations are scheduled for production implementation in 1995. Realizing that the second generation HCFC blowing agents are an interim solution, the evaluation of third generation blowing agents with zero ozone depletion potential is underway. NASA's TPS Materials Research Laboratory is evaluating third generation blowing agents in cryogenic insulations for the External Tank; one option being investigated is the use of water as a foaming agent. A dimensionally stable insulation with low friability, good adhesion to cryogenic substrates, and acceptable thermal conductivity has been developed with low viscosity materials that are easily processed in molding applications. The development criteria, statistical experimental approach, and resulting foam properties will be presented.

  7. The Safe Removal of Frozen Air from the Annulus of an LH2 Storage Tank

    NASA Technical Reports Server (NTRS)

    Krenn, A.; Starr, S.; Youngquist, R.; Nurge, M.; Sass, J.; Fesmire, J.; Cariker, C.; Bhattacharya, A.

    2015-01-01

    Large Liquid Hydrogen (LH2) storage tanks are vital infrastructure for NASA. Eventually, air may leak into the evacuated and perlite filled annular region of these tanks. Although the vacuum level is monitored in this region, the extremely cold temperature causes all but the helium and neon constituents of air to freeze. A small, often unnoticeable pressure rise is the result. As the leak persists, the quantity of frozen air increases, as does the thermal conductivity of the insulation system. Consequently, a notable increase in commodity boil-off is often the first indicator of an air leak. Severe damage can result from normal draining of the tank. The warming air will sublimate which will cause a pressure rise in the annulus. When the pressure increases above the triple point, the frozen air will begin to melt and migrate downward. Collection of liquid air on the carbon steel outer shell may chill it below its ductility range, resulting in fracture. In order to avoid a structural failure, as described above, a method for the safe removal of frozen air is needed. A thermal model of the storage tank has been created using SINDA/FLUINT modeling software. Experimental work is progressing in an attempt to characterize the thermal conductivity of a perlite/frozen nitrogen mixture. A statistical mechanics model is being developed in parallel for comparison to experimental work. The thermal model will be updated using the experimental/statistical mechanical data, and used to simulate potential removal scenarios. This paper will address methodologies and analysis techniques for evaluation of two proposed air removal methods.

  8. Controlling Endemic Pathogens—Challenges and Opportunities

    PubMed Central

    Shankaran, Sunita S.; James, William L.

    2016-01-01

    Abstract By most measures, the University of Utah Centralized Zebrafish Animal Resource is a successful zebrafish core facility: we house ∼4000–5000 tanks for over 16 research groups; provide services and equipment for ∼150 users; are currently undergoing an expansion by 3000 tanks; and have been praised by institutional and national regulatory agencies for the cleanliness and efficiency of our facility. In recent years, we have implemented new programs to improve the overall health of our colony and believe we have seen a reduction in apparently sick fish. However, there are still deficiencies in our monitoring and pathogen control programs. Our histopathology sample sizes have been insufficient to estimate prevalence, but our sentinel tank program reveals the presence of Pseudoloma neurophilia and myxozoan, presumably Myxidium streisinger, in our facility. As we develop protocols to further reduce the burden of disease, we are focused on defining our baseline, establishing goals, and implementing methods to monitor our progress. The data generated by this approach will allow us to evaluate and implement the most cost-effective protocols to improve fish health. PMID:26982004

  9. Spectral Mass Gauging of Unsettled Liquid with Acoustic Waves

    NASA Technical Reports Server (NTRS)

    Feller, Jeffrey; Kashani, Ali; Khasin, Michael; Muratov, Cyrill; Osipov, Viatcheslav; Sharma, Surendra

    2018-01-01

    Propellant mass gauging is one of the key technologies required to enable the next step in NASA's space exploration program. At present, there is no reliable method to accurately measure the amount of unsettled liquid propellant of an unknown configuration in a propellant tank in micro- or zero gravity. We propose a new approach to use sound waves to probe the resonance frequencies of the two-phase liquid-gas mixture and take advantage of the mathematical properties of the high frequency spectral asymptotics to determine the volume fraction of the tank filled with liquid. We report the current progress in exploring the feasibility of this approach, both experimental and theoretical. Excitation and detection procedures using solenoids for excitation and both hydrophones and accelerometers for detection have been developed. A 3% uncertainty for mass-gauging was demonstrated for a 200-liter tank partially filled with water for various unsettled configurations, such as tilts and artificial ullages. A new theoretical formula for the counting function associated with axially symmetric modes was derived. Scaling analysis of the approach has been performed to predict an adequate performance for in-space applications.

  10. KSC-98pc641

    NASA Image and Video Library

    1998-05-26

    Technicians supervise the closure of Discovery's payload bay doors from the Payload Changout Room at Launch Pad 39A as preparations for the STS-91 launch continue. STS-91 is scheduled to be launched on June 2 with a launch window opening around 6:10 p.m. EDT. The mission will feature the ninth Shuttle docking with the Russian Space Station Mir, the first Mir docking for Discovery, the conclusion of Phase I of the joint U.S.-Russian International Space Station Program, and the first flight of the new Space Shuttle super lightweight external tank. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir

  11. KSC-98pc640

    NASA Image and Video Library

    1998-05-26

    Technicians supervise the closure of Discovery's payload bay doors from the Payload Changout Room at Launch Pad 39A as preparations for the STS-91 launch continue. STS-91 is scheduled to be launched on June 2 with a launch window opening around 6:10 p.m. EDT. The mission will feature the ninth Shuttle docking with the Russian Space Station Mir, the first Mir docking for Discovery, the conclusion of Phase I of the joint U.S.-Russian International Space Station Program, and the first flight of the new Space Shuttle super lightweight external tank. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir

  12. Value of delayed duplex ultrasound assessment after endothermal ablation of the great saphenous vein.

    PubMed

    Ryer, Evan J; Elmore, James R; Garvin, Robert P; Cindric, Matthew C; Dove, James T; Kekulawela, Stephanie; Franklin, David P

    2016-08-01

    Endothermal ablation (ETA) of the great saphenous vein (GSV) is associated with a small but definite risk of endothermal heat-induced thrombosis (EHIT) extending into the common femoral vein. Follow-up duplex ultrasound imaging to detect EHIT after ETA is considered standard of care, although the exact timing of duplex ultrasound imaging to detect EHIT after ETA remains unclear. We hypothesized that an additional duplex ultrasound assessment 1 week after ETA would not identify a significant number of patients with EHIT and would significantly increase health care costs. This was a retrospective review of consecutive ETA GSV procedures from 2007 to 2014. All patients were evaluated with duplex ultrasound imaging on postprocedure day 1, and 79% of patients underwent a second ultrasound assessment 1 week postprocedure. EHIT was considered present when proximal GSV closure progressed to level ≥4, based on a six-tier classification system. From January 1, 2007, until December 31, 2014, 842 patients underwent GSV ETA. Patients with EHIT were more likely to have had a prior deep venous thrombosis (DVT; P = .002) and a larger GSV (P = .006). Forty-three procedures (5.1%) were classified as having EHIT requiring anticoagulation, based on a level ≥4 proximal closure level. Of the 43 patients with EHIT, 20 (47%) were found on the initial ultrasound assessment performed 24 hours postprocedure, but 19 patients (44%) with EHIT would not have been identified with a single postoperative ultrasound scan performed 24 hours after intervention. These 19 patients had a level ≤3 closure level at the duplex ultrasound scan performed 24 hours postprocedure and progressed to EHIT on the delayed duplex ultrasound scan. Lastly, thrombotic complications in four patients (9%), representing three late DVT and one DVT/pulmonary embolism presenting to another hospital, would not have been identified regardless of the postoperative surveillance strategy. Maximum GSV diameter was the only significant predictor of progression to EHIT on multivariate analysis (P = .007). Based on 2014 United States dollars, the two-ultrasound surveillance paradigm is associated with health care charges of $31,109 per identified delayed venous thromboembolism event. Delayed duplex ultrasound assessment after ETA of the GSV comes with associated health care costs but does yield a significant number of patients with progression to EHIT. Better understanding of the timing, risk factors, and significance of EHIT is needed to cost-effectively care for patients after ETA for varicose veins. Copyright © 2016 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.

  13. SULFURHEXAFLUORIDE (SF6) VERSUS PERFLUOROPROPANE (C3F8) GAS AS TAMPONADE IN MACULAR HOLE SURGERY.

    PubMed

    Modi, Aditya; Giridhar, Anantharaman; Gopalakrishnan, Mahesh

    2017-02-01

    To compare outcomes of macular hole surgery using sulfurhexafluoride (SF6) versus perfluoropropane (C3F8) gas. This is a retrospective, interventional, comparative study. A total of 177 eyes of 166 patients operated over a 3-year period for idiopathic macular holes were included. Sixty-seven eyes had tamponade with SF6 gas (Group 1), whereas 111 eyes received C3F8 (Group 2) as the tamponading agent. The primary outcome measure was the macular hole closure rate. Statistical analysis was done using SPSSv16. Spectral domain optical coherence tomography-based stagewise distribution of macular holes were similar across both groups (P = 0.99). The hole closure rate was 57/66 (86.4%) with SF6 and 96/111 (86.5%) with C3F8 gas (P = 0.98). Subanalysis demonstrated no significant difference in closure rates regarding macular hole size, stage, or duration. Best-corrected visual acuity improved by a mean of 0.28 logMAR in the SF6 group (P = 0.00) and 0.42 logMAR in the C3F8 group, corresponding to 3 lines and 4 lines of improvement, respectively, on the Early Treatment Diabetic Retinopathy Study chart (P < 0.05). The difference was not significant (P = 0.06). Rise in intraocular pressure was higher in the C3F8 group (P < 0.05). Progression of cataract was also greater in the C3F8 group (83.3 vs.73.9%), but it was not statistically significant (P = 0.20). Resurgery was done in 9/177 eyes. The closure rate with C3F8 and SF6 reinjections was 3/4 (75%) and 1/5 (20%). Moreover, anatomical hole closure after resurgeries was better in Group 1 (4/5 eyes) than in Group 2 (0/4 eyes). The macular hole closure rate was similar with sulfurhexafluoride and perfluoropropane, irrespective of hole size, stage, or duration. However, sulfurhexafluoride exhibited a decreased incidence of cataract and ocular hypertension with shorter tamponade duration. Perfluoropropane may have a role as the preferred endotamponading agent in failed primary surgeries.

  14. Refined annotation and assembly of the Tetrahymena thermophila genome sequence through EST analysis, comparative genomic hybridization, and targeted gap closure

    PubMed Central

    Coyne, Robert S; Thiagarajan, Mathangi; Jones, Kristie M; Wortman, Jennifer R; Tallon, Luke J; Haas, Brian J; Cassidy-Hanley, Donna M; Wiley, Emily A; Smith, Joshua J; Collins, Kathleen; Lee, Suzanne R; Couvillion, Mary T; Liu, Yifan; Garg, Jyoti; Pearlman, Ronald E; Hamilton, Eileen P; Orias, Eduardo; Eisen, Jonathan A; Methé, Barbara A

    2008-01-01

    Background Tetrahymena thermophila, a widely studied model for cellular and molecular biology, is a binucleated single-celled organism with a germline micronucleus (MIC) and somatic macronucleus (MAC). The recent draft MAC genome assembly revealed low sequence repetitiveness, a result of the epigenetic removal of invasive DNA elements found only in the MIC genome. Such low repetitiveness makes complete closure of the MAC genome a feasible goal, which to achieve would require standard closure methods as well as removal of minor MIC contamination of the MAC genome assembly. Highly accurate preliminary annotation of Tetrahymena's coding potential was hindered by the lack of both comparative genomic sequence information from close relatives and significant amounts of cDNA evidence, thus limiting the value of the genomic information and also leaving unanswered certain questions, such as the frequency of alternative splicing. Results We addressed the problem of MIC contamination using comparative genomic hybridization with purified MIC and MAC DNA probes against a whole genome oligonucleotide microarray, allowing the identification of 763 genome scaffolds likely to contain MIC-limited DNA sequences. We also employed standard genome closure methods to essentially finish over 60% of the MAC genome. For the improvement of annotation, we have sequenced and analyzed over 60,000 verified EST reads from a variety of cellular growth and development conditions. Using this EST evidence, a combination of automated and manual reannotation efforts led to updates that affect 16% of the current protein-coding gene models. By comparing EST abundance, many genes showing apparent differential expression between these conditions were identified. Rare instances of alternative splicing and uses of the non-standard amino acid selenocysteine were also identified. Conclusion We report here significant progress in genome closure and reannotation of Tetrahymena thermophila. Our experience to date suggests that complete closure of the MAC genome is attainable. Using the new EST evidence, automated and manual curation has resulted in substantial improvements to the over 24,000 gene models, which will be valuable to researchers studying this model organism as well as for comparative genomics purposes. PMID:19036158

  15. Range Reference Notebook

    DTIC Science & Technology

    2006-10-15

    EM 61 and a Schonstedt Magnetometer . The magnetometer was used to screen locations for stakes and other intrusive activities. Digital geophysics was...patterns from direct-fire weapons, such as anti-tank rockets, are expected to form ellipses that are highly elongated parallel to the line of fire...Trajectory of Indirect Fire Weapons Historically, precision development progressed more slowly for indirect-fire weapons because hitting an unseen target

  16. Progress in turbulence modeling for complex flow fields including effects of compressibility

    NASA Technical Reports Server (NTRS)

    Wilcox, D. C.; Rubesin, M. W.

    1980-01-01

    Two second-order-closure turbulence models were devised that are suitable for predicting properties of complex turbulent flow fields in both incompressible and compressible fluids. One model is of the "two-equation" variety in which closure is accomplished by introducing an eddy viscosity which depends on both a turbulent mixing energy and a dissipation rate per unit energy, that is, a specific dissipation rate. The other model is a "Reynolds stress equation" (RSE) formulation in which all components of the Reynolds stress tensor and turbulent heat-flux vector are computed directly and are scaled by the specific dissipation rate. Computations based on these models are compared with measurements for the following flow fields: (a) low speed, high Reynolds number channel flows with plane strain or uniform shear; (b) equilibrium turbulent boundary layers with and without pressure gradients or effects of compressibility; and (c) flow over a convex surface with and without a pressure gradient.

  17. Noncirrhotic Extrahepatic Portosystemic Shunt Causing Adult-Onset Encephalopathy Treated with Endovascular Closure

    PubMed Central

    Elnekave, Eldad; Belenky, Eugenia; Van der Veer, Lindsley

    2015-01-01

    A 54-year-old woman presented with a six-month history of episodic confusion and progressive ataxia. A comprehensive metabolic panel was notable for elevated values of alkaline phosphatase (161 U/L), total bilirubin (1.5 mg/dL), and serum ammonia of 300 umol/L (normal range 9–47). Hepatitis panel, relevant serological tests, tumor markers (CA-19-9, CEA), and urea cycle enzyme studies were unrevealing. Lactulose and rifaximin therapy failed to normalize serum ammonia levels. Imaging revealed a structural vascular abnormality communicating between an enlarged inferior mesenteric vein and the left renal vein, measuring 16 mm in greatest diameter. The diagnosis of congenital extrahepatic portosystemic shunt was made and endovascular shunt closure was performed using a 22 mm Amplatzer II vascular plug. Within a day, serum ammonia levels normalized. Lactulose and rifaximin were discontinued, and confusion and ataxia resolved. PMID:26199783

  18. Small Intestinal Submucosa Plug for Closure of Dilated Nephrostomy Tracts: A Pilot Study in Swine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kakizawa, Hideyaki; Conlin, M. J.; Pavcnik, Dusan, E-mail: pavcnikd@ohsu.edu

    2010-06-15

    The aim of this study was to evaluate efficacy of a plug made of small intestinal submucosa (SIS) for closure of dilated nephrostomy tract in the kidney after nephroscopy. Ten kidneys in 5 swine had nephrostomy tracts dilated up to 8 mm. The SIS plug was placed into the dilated renal cortex under nephroscopic control. Follow-up arteriograms, retrograde pyelograms, and macroscopic and histologic studies at 24 h (n = 4), 6 weeks (n = 2), and 3 months (n = 4) were performed to evaluate the efficacy of the plug. The SIS plug effectively closed the dilated nephrostomy tract. Follow-upmore » studies showed minimal changes of the kidneys, except for 1 small infarction, regarding inflammatory and foreign-body reactions and progressive scarring of the SIS. SIS plug is effective for occlusion of dilated nephrostomy tract after nephroscopy. Its efficacy should be compared with other therapeutic options.« less

  19. CELSS Transportation Analysis

    NASA Technical Reports Server (NTRS)

    Olson, R. L.; Gustan, E. A.; Vinopal, T. J.

    1985-01-01

    Regenerative life support systems based on the use of biological material was considered for inclusion in manned spacecraft. Biological life support systems are developed in the controlled ecological life support system (CELSS) program. Because of the progress achieved in the CELSS program, it is determined which space missions may profit from use of the developing technology. Potential transportation cost savings by using CELSS technology for selected future manned space missions was evaluated. Six representative missions were selected which ranged from a low Earth orbit mission to those associated with asteroids and a Mars sortie. The crew sizes considered varied from four persons to five thousand. Other study parameters included mission duration and life support closure percentages, with the latter ranging from complete resupply of consumable life support materials to 97% closure of the life support system. The analytical study approach and the missions and systems considered, together with the benefits derived from CELSS when applicable are described.

  20. KSC-2011-3036

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lifted from its test cell for transfer to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  1. Case report: imaging and treatment of ophthalmic manifestations in oculodentodigital dysplasia.

    PubMed

    Mosaed, Sameh; Jacobsen, Bradley H; Lin, Ken Young

    2016-01-07

    Diagnostic and surgical management of severe chronic angle- closure glaucoma secondary to ciliary body cysts can be difficult to manage in a patient with oculodentodigital dysplasia. A 6-year old girl with oculodentodigital dysplasia, with progressive chronic angle- closure glaucoma secondary to ciliary body cysts presented to our clinic. The initial examination revealed counting fingers vision in the left eye. Intraocular pressure (IOP), as assessed by tonopen, was 31 mm Hg. Ultrasound biomicroscopy revealed ciliary body cysts in the left eye, and gonioscopy confirmed chronic angle closure. A tube shunt was placed to control the elevated IOP. A year after her tube shunt placement in the left eye, ultrasound biomiscropy was performed on her right eye and showed no ciliary body cysts. Gonioscopy in the right eye revealed an open angle to the ciliary body band. Subsequent serial gonioscopy every 3 months showed gradual narrowing of the right eye angle and finally three-and-a-half years after tube placement of the left eye, her right eye IOP became uncontrolled with medications alone and a tube shunt was similarly placed in the right eye. Intraoperative ultrasound biomicroscopy performed at the time of the right eye tube shunt revealed extensive ciliary body cysts in the right eye. Her IOP in both eyes have been well controlled since the placement of tube shunts. This is one of the first reported cases of severe chronic angle- closure glaucoma secondary to ciliary body cysts in a patient with oculodentodigital dysplasia. We believe that early screening for ciliary body cysts is important in patients with oculodentodigital dysplasia.

  2. CLOSING IN ON CLOSURE PERSPECTIVES FROM HANFORD & FERNALD AN UPDATE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CONNELL, J.D.

    2004-12-22

    In World War II, the arms dramatically changed from machine guns and incendiary bombs to nuclear weapons. Hanford and Fernald, two government-run sites, were part of the infrastructure established for producing the fissile material for making these weapons, as well as building a nuclear arsenal to deter future aggression by other nations. This paper compares and contrasts, from a communications point of view, these two Department of Energy (DOE) closure sites, each with Fluor as a prime contractor. The major differences between the two sites--Hanford in Washington state and Fernald in Ohio--includes the following: size of the site and themore » workforce, timing of closure, definition of end state, DOE oversight, proximity to population centers, readiness of local population for closure, and dependence of the local economy on the site's budget. All of these elements affect how the sites' communication professionals provide information even though the objectives are the same: build public acceptance and support for DOE's mission to accelerate cleanup, interface with stakeholders to help ensure that issues are addressed and goals are met, help workers literally work themselves out of jobs--faster, and prepare the ''host'' communities to deal with the void left when the sites are closed and the government contractors are gone. The 12-months between January 04 and January 05 have seen dramatic transformations at both sites, as Fernald is now just about a year away from closure and FLuor's work at Hanford has made the transition from operations to deactivation and demolition. While Fernald continues to clean out silos of waste and ship it off site, Hanford is dealing with recent state legislation that has the potential to significantly impact the progress of cleanup. These changes have even further accentuated the differences in the content, distribution, and impact of communications.« less

  3. Cortical Spreading Depression Closes Paravascular Space and Impairs Glymphatic Flow: Implications for Migraine Headache

    PubMed Central

    Melo-Carrillo, Agustin; Strassman, Andrew M.

    2017-01-01

    Functioning of the glymphatic system, a network of paravascular tunnels through which cortical interstitial solutes are cleared from the brain, has recently been linked to sleep and traumatic brain injury, both of which can affect the progression of migraine. This led us to investigate the connection between migraine and the glymphatic system. Taking advantage of a novel in vivo method we developed using two-photon microscopy to visualize the paravascular space (PVS) in naive uninjected mice, we show that a single wave of cortical spreading depression (CSD), an animal model of migraine aura, induces a rapid and nearly complete closure of the PVS around surface as well as penetrating cortical arteries and veins lasting several minutes, and gradually recovering over 30 min. A temporal mismatch between the constriction or dilation of the blood vessel lumen and the closure of the PVS suggests that this closure is not likely to result from changes in vessel diameter. We also show that CSD impairs glymphatic flow, as indicated by the reduced rate at which intraparenchymally injected dye was cleared from the cortex to the PVS. This is the first observation of a PVS closure in connection with an abnormal cortical event that underlies a neurological disorder. More specifically, the findings demonstrate a link between the glymphatic system and migraine, and suggest a novel mechanism for regulation of glymphatic flow. SIGNIFICANCE STATEMENT Impairment of brain solute clearance through the recently described glymphatic system has been linked with traumatic brain injury, prolonged wakefulness, and aging. This paper shows that cortical spreading depression, the neural correlate of migraine aura, closes the paravascular space and impairs glymphatic flow. This closure holds the potential to define a novel mechanism for regulation of glymphatic flow. It also implicates the glymphatic system in the altered cortical and endothelial functioning of the migraine brain. PMID:28193695

  4. Cortical Spreading Depression Closes Paravascular Space and Impairs Glymphatic Flow: Implications for Migraine Headache.

    PubMed

    Schain, Aaron J; Melo-Carrillo, Agustin; Strassman, Andrew M; Burstein, Rami

    2017-03-15

    Functioning of the glymphatic system, a network of paravascular tunnels through which cortical interstitial solutes are cleared from the brain, has recently been linked to sleep and traumatic brain injury, both of which can affect the progression of migraine. This led us to investigate the connection between migraine and the glymphatic system. Taking advantage of a novel in vivo method we developed using two-photon microscopy to visualize the paravascular space (PVS) in naive uninjected mice, we show that a single wave of cortical spreading depression (CSD), an animal model of migraine aura, induces a rapid and nearly complete closure of the PVS around surface as well as penetrating cortical arteries and veins lasting several minutes, and gradually recovering over 30 min. A temporal mismatch between the constriction or dilation of the blood vessel lumen and the closure of the PVS suggests that this closure is not likely to result from changes in vessel diameter. We also show that CSD impairs glymphatic flow, as indicated by the reduced rate at which intraparenchymally injected dye was cleared from the cortex to the PVS. This is the first observation of a PVS closure in connection with an abnormal cortical event that underlies a neurological disorder. More specifically, the findings demonstrate a link between the glymphatic system and migraine, and suggest a novel mechanism for regulation of glymphatic flow. SIGNIFICANCE STATEMENT Impairment of brain solute clearance through the recently described glymphatic system has been linked with traumatic brain injury, prolonged wakefulness, and aging. This paper shows that cortical spreading depression, the neural correlate of migraine aura, closes the paravascular space and impairs glymphatic flow. This closure holds the potential to define a novel mechanism for regulation of glymphatic flow. It also implicates the glymphatic system in the altered cortical and endothelial functioning of the migraine brain. Copyright © 2017 the authors 0270-6474/17/372904-12$15.00/0.

  5. FY 2017-Progress Report on the Design and Construction of the Sodium Loop SMT-3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Natesan, K.; Momozaki, Y.

    This report provides an update on the design of a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY17 (M4AT-17AN1602094), under the Work Package AT-17AN160209, “Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion,more » microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. The design of individual components for the third sodium loop SMT-3 is almost complete. The design also has been sent to an outside vendor for piping analysis to be in compliance with ASME Code. A purchase order has been placed with an outside vendor for the fabrication of major components such as the specimen exposure tanks. However, we have contracted with another vendor to establish the piping design in compliance with ASME design codes. The piping design was completed in FY2017 and the information is being transmitted to the tank fabricator. The SMT-3 loop will be located in Building 206 adjacent to the currently operating SMT-2 loop. In addition, we have demolished the aged power supply system in Building 206 and installed a new transformer, wiring, and power panels for the new loop. Procurement of some of the long lead items such as valves, EM pumps, EM flowmeters, etc. is in progress and will continue in FY 2018. The construction of components such as cold trap, economizers, piping arrangement etc. will be performed in the central shops at ANL. About 150 liters of sodium for the loop will be procured in early FY2018. The loop system is designed to circulate sodium through the sample tanks and the associated loop without an operator for an extended period of time. With the three sodium loops (with single-tank, dual-tank and four–tanks), materials can be tested at different sodium temperatures, and large tensile, creep, fatigue, creep-fatigue, and fracture toughness specimens can be exposed to sodium for extended periods of time and generate data on mechanical properties in support of ASME Code Qualification and USNRC Licensing of advanced Alloy 709 for use as a structural material in SFRs.« less

  6. Un formalisme de systemes a sauts pour la recirculation optimale des casses dans une machine a papier

    NASA Astrophysics Data System (ADS)

    Khanbaghi, Maryam

    Increasing closure of white water circuits is making mill productivity and quality of paper produced increasingly affected by the occurrence of paper breaks. In this thesis the main objective is the development of white water and broke recirculation policies. The thesis consists of three main parts, respectively corresponding to the synthesis of a statistical model of paper breaks in a paper mill, the basic mathematical setup for the formulation of white water and broke recirculation policies in the mill as a jump linear quadratic regulation problem, and finally the tuning of the control law based on first passage-time theory, and its extension to the case of control sensitive paper break rates. More specifically, in the first part a statistical model of paper machine breaks is developed. We start from the hypothesis that the breaks process is a Markov chain with three states: the first state is the operational one, while the two others are associated with the general types of paper-breaks that can take place in the mill (wet breaks and dry breaks). The Markovian hypothesis is empirically validated. We also establish how paper-break rates are correlated with machine speed and broke recirculation ratio. Subsequently, we show how the obtained Markov chain model of paper-breaks can be used to formulate a machine operating speed parameter optimization problem. In the second part, upon recognizing that paper breaks can be modelled as a Markov chain type of process which, when interacting with the continuous mill dynamics, yields a jump Markov model, jump linear theory is proposed as a means of constructing white water and broke recirculation strategies which minimize process variability. Reduced process variability comes at the expense of relatively large swings in white water and broke tanks level. Since the linear design does not specifically account for constraints on the state-space, under the resulting law, damaging events of tank overflow or emptiness can occur. A heuristic simulation-based approach is proposed to choose the performance measure design parameters to keep the mean time between incidents of fluid in broke and white water tanks either overflowing, or reaching dangerously low levels, sufficiently long. In the third part, a methodology, mainly founded on the first passage-time theory of stochastic processes, is proposed to choose the performance measure design parameters to limit process variability while accounting for the possibility of undesirable tank overflows or tank emptiness. The heart of the approach is an approximation technique for evaluating mean first passage-times of the controlled tanks levels. This technique appears to have an applicability which largely exceeds the problem area it was designed for. Furthermore, the introduction of control sensitive break rates and the analysis of the ensuing control problem are presented. This is to account for the experimentally observed increase in breaks concomitant with flow rate variability.

  7. European Scientific Notes. Volume 35, Number 6.

    DTIC Science & Technology

    1981-06-30

    center where the operator can relationships are promoted in four ways: regulate the test conditions (air storage 211 +* , FSN 35-6 (1981) tanks, model ...tunnel models , for itself asymmetric aileron deflection and post- and its clients, using computer-controlled stall aerodynamics are in progress...those attending the Discussion nonaqueous solutions, (6) new theoretical was somewhat reduced by the fact that models , (7) Fermi-level concepts in solu

  8. PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FARABEE OA; HERZOG B; CAMERON C

    2012-02-16

    The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft)more » long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.« less

  9. Necrotizing fasciitis in a patient with type 2 diabetes mellitus.

    PubMed

    Kanuck, David M; Zgonis, Thomas; Jolly, Gary Peter

    2006-01-01

    Necrotizing fasciitis is a soft-tissue infection characterized by extensive necrosis of subcutaneous fat, neurovascular structures, and fascia. In general, fascial necrosis precedes muscle and skin involvement, hence its namesake. Initially, this uncommon and rapidly progressive disease process can present as a form of cellulitis or superficial abscess. However, the high morbidity and mortality rates associated with necrotizing fasciitis suggest a more serious, ominous condition. A delay in diagnosis can result in progressive advancement highlighted by widespread infection, multiple-organ involvement, and, ultimately, death. We present a case of limb salvage in a 52-year-old patient with type 2 diabetes mellitus and progressive fascial necrosis. A detailed review of the literature is presented, and current treatment modalities are described. Aggressive surgical debridement, comprehensive medical management of the sepsis and comorbidities, and timely closure of the resultant wound or wounds are essential for a successful outcome.

  10. Use of a Lysine-Derived Urethane Surgical Adhesive as an Alternative to Progressive Tension Sutures in Abdominoplasty Patients: A Cohort Study.

    PubMed

    Spring, Michelle A

    2018-04-07

    Fluid accumulation is a common complication after abdominoplasty procedures, and is typically managed by the placement of post-surgical drains. Progressive tension sutures (PTS) have been shown to be an effective approach to reduce the dead space by point-wise mechanical fixation, allowing for drain-free procedures. Lysine-derived urethane surgical adhesive provides an alternative approach for mechanical fixation and reduction of dead space, and may reduce surgery time compared to PTS. This prospective, controlled, single center clinical study compared progressive tension suture wound closure technique without drains (control) to tissue adhesive wound closure technique without drains (test) during abdominoplasty surgery. The objective was to determine if lysine-derived urethane surgical adhesive is an effective alternative to PTS for drain-free abdominoplasty procedures. Patients undergoing abdominoplasty who met the established inclusion/exclusion criteria were consented and enrolled in the study. Ten PTS (control) cases were performed, followed immediately by ten tissue adhesive (test) cases. Drains were not used in any procedures. Key outcome measures included all major and minor post-surgical complications requiring any intervention, the time to place progressive tension sutures versus time for tissue adhesive application, and number of PTS attachments versus number of adhesive drops applied. Surgeries were completed over an 8-month period. No statistical differences were identified between the two groups with regard to age, BMI, dissection surface area or flap weight. No clinical seroma formation was observed in either group. In the control (PTS) group, two patients developed small areas of dermal closure suture abscess requiring removal of suture material. One control patient developed drainage and fat necrosis thought to be related to PTS above the incision and later required a scar revision. One tissue adhesive patient developed hypertrophic scars of both her breast reduction and abdominoplasty scars requiring additional treatment. The average time to place PTS in the control group was 10.7 minutes (range, 7-18 minutes) and the average number of sutures placed was 16.6 (range, 12-22 sutures). In the test group, the average time to place the tissue adhesive and hold pressure was 5.9 minutes (range 5.5-8.0 minutes). The average number of tissue adhesive drops applied was 69.6 (range: 63-78 drops). In the tissue adhesive group, both the reduction in time for flap adhesion and the increased number of adhesive points were statistically significant when compared to PTS. Lysine-derived urethane surgical adhesive was applied in less time than progressive tension sutures, even after accounting for holding pressure for 5 minutes. The tissue adhesive provided four times the number of attachment points compared to PTS, although the significance of this is not clear. There were no postoperative clinical seromas detected in either group and there were no major complications in either group. Based on these results, the use of lysine-derived urethane surgical adhesive was found to be a safe and effective alternative to progressive tension sutures to reduce seroma formation in drain-free abdominoplasty procedures.

  11. A randomized, phase II study of pazopanib in castrate-sensitive prostate cancer: a University of Chicago Phase II Consortium/Department of Defense Prostate Cancer Clinical Trials Consortium study.

    PubMed

    Ward, J E; Karrison, T; Chatta, G; Hussain, M; Shevrin, D; Szmulewitz, R Z; O'Donnell, P H; Stadler, W M; Posadas, E M

    2012-03-01

    Intermittent androgen suppression (IAS) is an increasingly popular treatment option for castrate-sensitive prostate cancer. On the basis of previous data with anti-angiogenic strategies, we hypothesized that pan-inhibition of the vascular endothelial growth factor receptor using pazopanib during the IAS off period would result in prolonged time to PSA failure. Men with biochemically recurrent prostate cancer, whose PSA was <0.5 ng ml(-1) after 6 months of androgen deprivation therapy were randomized to pazopanib 800 mg daily or observation. The planned primary outcome was time to PSA progression >4.0 ng ml(-1). Thirty-seven patients were randomized. Of 18 patients randomized to pazopanib, at the time of study closure, 4 had progressive disease, 1 remained on treatment and 13 (72%) electively disenrolled, the most common reason being patient request due to grade 1/2 toxicity (8 patients). Two additional patients were removed from treatment due to adverse events. Of 19 patients randomized to observation, at the time of study closure, 4 had progressive disease, 7 remained under protocol-defined observation and 8 (42%) had disenrolled, most commonly due to non-compliance with protocol visits (3 patients). Because of high dropout rates in both arms, the study was halted. IAS is a treatment approach that may facilitate investigation of novel agents in the hormone-sensitive state. This trial attempted to investigate the role of antiangiogenic therapy in this setting, but encountered several barriers, including toxicities and patient non-compliance, which can make implementation of such a study difficult. Future investigative efforts in this arena should carefully consider drug toxicity and employ a design that maximizes patient convenience to reduce the dropout rate.

  12. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feist, E.T.

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH ismore » a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)« less

  13. Evolving Applications, Technological Challenges and Future Opportunities in Neuromodulation: Proceedings of the Fifth Annual Deep Brain Stimulation Think Tank

    PubMed Central

    Ramirez-Zamora, Adolfo; Giordano, James J.; Gunduz, Aysegul; Brown, Peter; Sanchez, Justin C.; Foote, Kelly D.; Almeida, Leonardo; Starr, Philip A.; Bronte-Stewart, Helen M.; Hu, Wei; McIntyre, Cameron; Goodman, Wayne; Kumsa, Doe; Grill, Warren M.; Walker, Harrison C.; Johnson, Matthew D.; Vitek, Jerrold L.; Greene, David; Rizzuto, Daniel S.; Song, Dong; Berger, Theodore W.; Hampson, Robert E.; Deadwyler, Sam A.; Hochberg, Leigh R.; Schiff, Nicholas D.; Stypulkowski, Paul; Worrell, Greg; Tiruvadi, Vineet; Mayberg, Helen S.; Jimenez-Shahed, Joohi; Nanda, Pranav; Sheth, Sameer A.; Gross, Robert E.; Lempka, Scott F.; Li, Luming; Deeb, Wissam; Okun, Michael S.

    2018-01-01

    The annual Deep Brain Stimulation (DBS) Think Tank provides a focal opportunity for a multidisciplinary ensemble of experts in the field of neuromodulation to discuss advancements and forthcoming opportunities and challenges in the field. The proceedings of the fifth Think Tank summarize progress in neuromodulation neurotechnology and techniques for the treatment of a range of neuropsychiatric conditions including Parkinson's disease, dystonia, essential tremor, Tourette syndrome, obsessive compulsive disorder, epilepsy and cognitive, and motor disorders. Each section of this overview of the meeting provides insight to the critical elements of discussion, current challenges, and identified future directions of scientific and technological development and application. The report addresses key issues in developing, and emphasizes major innovations that have occurred during the past year. Specifically, this year's meeting focused on technical developments in DBS, design considerations for DBS electrodes, improved sensors, neuronal signal processing, advancements in development and uses of responsive DBS (closed-loop systems), updates on National Institutes of Health and DARPA DBS programs of the BRAIN initiative, and neuroethical and policy issues arising in and from DBS research and applications in practice. PMID:29416498

  14. NASA-USRP Summer 2013 Internship Final Report

    NASA Technical Reports Server (NTRS)

    Gurganus, S. Christine

    2013-01-01

    Three major projects were undertaken during the Summer 2013 USRP Internship: (A) assisting the cTAPS group with component and pressure vessel system analyses and documentation, (B) designing a hoisting fixture for a solid rocket motor, (C) finding an alternative to removing the DOT rated gaseous nitrogen tank from the roof for hydrostatic testing. Hypergolic Material Assessments (HMAs) and pressure calculations were performed on components of pressure systems. Additionally, component information was logged in the Standard Parts Database to provide a location where system designers can find information regarding components, including their specifications and compatibility with fluids. A hoisting fixture was designed to hoist a solid rocket motor and meets the specifications related to stress and size. However, there are issues with the fixtures bolt head allotment, the bolt spacing, and the complexity of the part. Finally, calculations were performed on an expiring DOT rated gaseous nitrogen tank in an attempt to re-rate it per ASME standards. This was unsuccessful so other options are being explored for the tank. While much progress was made on all three projects, there is still work to be performed on each project to achieve the desired results.

  15. Evolving Applications, Technological Challenges and Future Opportunities in Neuromodulation: Proceedings of the Fifth Annual Deep Brain Stimulation Think Tank.

    PubMed

    Ramirez-Zamora, Adolfo; Giordano, James J; Gunduz, Aysegul; Brown, Peter; Sanchez, Justin C; Foote, Kelly D; Almeida, Leonardo; Starr, Philip A; Bronte-Stewart, Helen M; Hu, Wei; McIntyre, Cameron; Goodman, Wayne; Kumsa, Doe; Grill, Warren M; Walker, Harrison C; Johnson, Matthew D; Vitek, Jerrold L; Greene, David; Rizzuto, Daniel S; Song, Dong; Berger, Theodore W; Hampson, Robert E; Deadwyler, Sam A; Hochberg, Leigh R; Schiff, Nicholas D; Stypulkowski, Paul; Worrell, Greg; Tiruvadi, Vineet; Mayberg, Helen S; Jimenez-Shahed, Joohi; Nanda, Pranav; Sheth, Sameer A; Gross, Robert E; Lempka, Scott F; Li, Luming; Deeb, Wissam; Okun, Michael S

    2017-01-01

    The annual Deep Brain Stimulation (DBS) Think Tank provides a focal opportunity for a multidisciplinary ensemble of experts in the field of neuromodulation to discuss advancements and forthcoming opportunities and challenges in the field. The proceedings of the fifth Think Tank summarize progress in neuromodulation neurotechnology and techniques for the treatment of a range of neuropsychiatric conditions including Parkinson's disease, dystonia, essential tremor, Tourette syndrome, obsessive compulsive disorder, epilepsy and cognitive, and motor disorders. Each section of this overview of the meeting provides insight to the critical elements of discussion, current challenges, and identified future directions of scientific and technological development and application. The report addresses key issues in developing, and emphasizes major innovations that have occurred during the past year. Specifically, this year's meeting focused on technical developments in DBS, design considerations for DBS electrodes, improved sensors, neuronal signal processing, advancements in development and uses of responsive DBS (closed-loop systems), updates on National Institutes of Health and DARPA DBS programs of the BRAIN initiative, and neuroethical and policy issues arising in and from DBS research and applications in practice.

  16. Categorizing the severity of paralytic shellfish poisoning outbreaks in the Gulf of Maine for forecasting and management

    NASA Astrophysics Data System (ADS)

    Kleindinst, Judith L.; Anderson, Donald M.; McGillicuddy, Dennis J.; Stumpf, Richard P.; Fisher, Kathleen M.; Couture, Darcie A.; Michael Hickey, J.; Nash, Christopher

    2014-05-01

    Development of forecasting systems for harmful algal blooms (HABs) has been a long-standing research and management goal. Significant progress has been made in the Gulf of Maine, where seasonal bloom forecasts are now being issued annually using Alexandrium fundyense cyst abundance maps and a population dynamics model developed for that organism. Thus far, these forecasts have used terms such as “significant”, “moderately large” or “moderate” to convey the extent of forecasted paralytic shellfish poisoning (PSP) outbreaks. In this study, historical shellfish harvesting closure data along the coast of the Gulf of Maine were used to derive a series of bloom severity levels that are analogous to those used to define major storms like hurricanes or tornados. Thirty-four years of PSP-related shellfish closure data for Maine, Massachusetts and New Hampshire were collected and mapped to depict the extent of coastline closure in each year. Due to fractal considerations, different methods were explored for measuring length of coastline closed. Ultimately, a simple procedure was developed using arbitrary straight-line segments to represent specific sections of the coastline. This method was consistently applied to each year’s PSP toxicity closure map to calculate the total length of coastline closed. Maps were then clustered together statistically to yield distinct groups of years with similar characteristics. A series of categories or levels was defined (“Level 1: Limited”, “Level 2: Moderate”, and “Level 3: Extensive”) each with an associated range of expected coastline closed, which can now be used instead of vague descriptors in future forecasts. This will provide scientifically consistent and simply defined information to the public as well as resource managers who make decisions on the basis of the forecasts.

  17. Categorizing the severity of paralytic shellfish poisoning outbreaks in the Gulf of Maine for forecasting and management

    PubMed Central

    Kleindinst, Judith L.; Anderson, Donald M.; McGillicuddy, Dennis J.; Stumpf, Richard P.; Fisher, Kathleen M.; Couture, Darcie A.; Hickey, J. Michael; Nash, Christopher

    2014-01-01

    Development of forecasting systems for harmful algal blooms (HABs) has been a long-standing research and management goal. Significant progress has been made in the Gulf of Maine, where seasonal bloom forecasts are now being issued annually using Alexandrium fundyense cyst abundance maps and a population dynamics model developed for that organism. Thus far, these forecasts have used terms such as “significant”, “moderately large” or “moderate” to convey the extent of forecasted paralytic shellfish poisoning (PSP) outbreaks. In this study, historical shellfish harvesting closure data along the coast of the Gulf of Maine were used to derive a series of bloom severity levels that are analogous to those used to define major storms like hurricanes or tornados. Thirty-four years of PSP-related shellfish closure data for Maine, Massachusetts and New Hampshire were collected and mapped to depict the extent of coastline closure in each year. Due to fractal considerations, different methods were explored for measuring length of coastline closed. Ultimately, a simple procedure was developed using arbitrary straight-line segments to represent specific sections of the coastline. This method was consistently applied to each year’s PSP toxicity closure map to calculate the total length of coastline closed. Maps were then clustered together statistically to yield distinct groups of years with similar characteristics. A series of categories or levels was defined (“Level 1: Limited”, “Level 2: Moderate”, and “Level 3: Extensive”) each with an associated range of expected coastline closed, which can now be used instead of vague descriptors in future forecasts. This will provide scientifically consistent and simply defined information to the public as well as resource managers who make decisions on the basis of the forecasts. PMID:25076815

  18. OsASR5 enhances drought tolerance through a stomatal closure pathway associated with ABA and H2 O2 signalling in rice.

    PubMed

    Li, Jinjie; Li, Yang; Yin, Zhigang; Jiang, Jihong; Zhang, Minghui; Guo, Xiao; Ye, Zhujia; Zhao, Yan; Xiong, Haiyan; Zhang, Zhanying; Shao, Yujie; Jiang, Conghui; Zhang, Hongliang; An, Gynheung; Paek, Nam-Chon; Ali, Jauhar; Li, Zichao

    2017-02-01

    Drought is one of the major abiotic stresses that directly implicate plant growth and crop productivity. Although many genes in response to drought stress have been identified, genetic improvement to drought resistance especially in food crops is showing relatively slow progress worldwide. Here, we reported the isolation of abscisic acid, stress and ripening (ASR) genes from upland rice variety, IRAT109 (Oryza sativa L. ssp. japonica), and demonstrated that overexpression of OsASR5 enhanced osmotic tolerance in Escherichia coli and drought tolerance in Arabidopsis and rice by regulating leaf water status under drought stress conditions. Moreover, overexpression of OsASR5 in rice increased endogenous ABA level and showed hypersensitive to exogenous ABA treatment at both germination and postgermination stages. The production of H 2 O 2 , a second messenger for the induction of stomatal closure in response to ABA, was activated in overexpression plants under drought stress conditions, consequently, increased stomatal closure and decreased stomatal conductance. In contrast, the loss-of-function mutant, osasr5, showed sensitivity to drought stress with lower relative water content under drought stress conditions. Further studies demonstrated that OsASR5 functioned as chaperone-like protein and interacted with stress-related HSP40 and 2OG-Fe (II) oxygenase domain containing proteins in yeast and plants. Taken together, we suggest that OsASR5 plays multiple roles in response to drought stress by regulating ABA biosynthesis, promoting stomatal closure, as well as acting as chaperone-like protein that possibly prevents drought stress-related proteins from inactivation. © 2016 The Authors. Plant Biotechnology Journal published by Society for Experimental Biology and The Association of Applied Biologists and John Wiley & Sons Ltd.

  19. Feasibility study from a randomized controlled trial of standard closure of a stoma site vs biological mesh reinforcement.

    PubMed

    2016-09-01

    Hernia formation occurs at closed stoma sites in up to 30% of patients. The Reinforcement of Closure of Stoma Site (ROCSS) randomized controlled trial is evaluating whether placement of biological mesh during stoma closure safely reduces hernia rates compared with closure without mesh, without increasing surgical or wound complications. This paper aims to report recruitment, deliverability and safety from the internal feasibility study. A multicentre, patient and assessor blinded, randomized controlled trial, delivered through surgical trainee research networks. A 90-patient internal feasibility study assessed recruitment, randomization, deliverability and early (30 day) safety of the novel surgical technique (ClinicalTrials.gov registration number NCT02238964). The feasibility study recruited 90 patients from the 104 considered for entry (45 to mesh, 45 to no mesh). Seven of eight participating centres randomized patients within 30 days of opening. Overall, 41% of stomas were created for malignant disease and 73% were ileostomies. No mesh-specific complications occurred. Thirty-one postoperative adverse events were experienced by 31 patients, including surgical site infection (9%) and postoperative ileus (6%). One mesh was removed for re-access to the abdominal cavity, for reasons unrelated to the mesh. Independent review by the Data Monitoring and Ethics Committee of adverse event data by treatment allocation found no safety concerns. Multicentre randomization to this trial of biological mesh is feasible, with no early safety concerns. Progression to the full Phase III trial has continued. ROCSS shows that trainee research networks can efficiently develop and deliver complex interventional surgical trials. Colorectal Disease © 2016 The Association of Coloproctology of Great Britain and Ireland.

  20. [Surgical closure of patent ductus arteriosus in premature neonates: Does the surgical technique affect the outcome?

    PubMed

    Avila-Alvarez, Alejandro; Serantes Lourido, Marta; Barriga Bujan, Rebeca; Blanco Rodriguez, Carolina; Portela-Torron, Francisco; Bautista-Hernandez, Victor

    2017-05-01

    Surgical closure of patent ductus arteriosus in premature neonates is an aggressive technique and is not free of complications. A study was designed with the aim of describing our experience with a less invasive technique, the extra-pleural approach via a posterior minithoracotomy, and to compare the results with the classic transpleural approach. A retrospective cohort study was conducted on premature neonates on whom surgical closure of the ductus was performed during a ten-year period (March 2005 to March 2015). A comparison was made of the acute complications, the outcomes on discharge, and follow-up, between the extra-pleural approach and the classic transpleural approach. The study included 48 patients, 30 in the classical approach and 18 in the extra-pleural group. The demographic and pre-operative characteristics were similar in both groups. No differences were found between the 2 groups in the incidence of acute post-operative complications (56.6 vs. 44.4%), on the dependence on oxygen at 36 weeks (33.3 vs. 55.5%), or in hospital mortality (10 vs. 16.6%). As regards the short-term progress, the extra-pleural group required fewer days until the withdrawal of supplementary oxygen (36.3 vs. 28.9) and until hospital discharge (67.5 vs. 53.2), although only the time until extubation achieved a statistically significant difference (11.5 vs. 2.7, P=.03). The extra-plural approach by posterior minithoracotomy for the surgical closure of ductus in the premature infant is viable and could bring some clinical benefits in the short-term. Copyright © 2015 Asociación Española de Pediatría. Publicado por Elsevier España, S.L.U. All rights reserved.

  1. Hydrogen peroxide propulsion for smaller satellites (SSC98-VIII-1)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitehead, J C

    1998-07-13

    As satellite designs shrink, providing maneuvering and control capability falls outside the realm of available propulsion technology. While cold gas has been used on the smallest satellites, hydrogen peroxide propellant is suggested as the next step in performance and cost before hydrazine. Minimal toxicity and a small scale enable benchtop propellant preparation and development testing. Progress toward low-cost thrusters and self-pressurizing tank systems is described.

  2. Orbital Maneuvering Vehicle (OMV) remote servicing kit

    NASA Technical Reports Server (NTRS)

    Brown, Norman S.

    1988-01-01

    With the design and development of the Orbital Maneuvering Vehicle (OMV) progressing toward an early 1990 initial operating capability (IOC), a new era in remote space operations will evolve. The logical progression to OMV front end kits would make available in situ satellite servicing, repair, and consummables resupply to the satellite community. Several conceptual design study efforts are defining representative kits (propellant tanks, debris recovery, module servicers); additional focus must also be placed on an efficient combination module servicer and consummables resupply kit. A remote servicer kit of this type would be designed to perform many of the early maintenance/resupply tasks in both nominal and high inclination orbits. The kit would have the capability to exchange Orbital Replacement Units (ORUs), exchange propellant tanks, and/or connect fluid transfer umbilicals. Necessary transportation system functions/support could be provided by interfaces with the OMV, Shuttle (STS), or Expendable Launch Vehicle (ELV). Specific remote servicer kit designs, as well as ground and flight demonstrations of servicer technology are necessary to prepare for the potential overwhelming need. Ground test plans should adhere to the component/system/breadboard test philosophy to assure maximum capability of one-g testing. The flight demonstration(s) would most likely be a short duration, Shuttle-bay experiment to validate servicer components requiring a micro-g environment.

  3. RCRA, superfund and EPCRA hotline training module. Introduction to: Closure/post-closure (40 cfr parts 264/265, subpart g) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less

  4. Extended negative pressure wound therapy-assisted dermatotraction for the closure of large open fasciotomy wounds in necrotizing fasciitis patients

    PubMed Central

    2014-01-01

    Background Necrotizing fasciitis (NF) is a rapid progressive infection of the subcutaneous tissue or fascia and may result in large open wounds. The surgical options to cover these wounds are often limited by the patient condition and result in suboptimal functional and cosmetic wound coverage. Dermatotraction can restore the function and appearance of the fasciotomy wound and is less invasive in patients with comorbidities. However, dermatotraction for scarred, stiff NF fasciotomy wounds is often ineffective, resulting in skin necrosis. The authors use extended negative pressure wound therapy (NPWT) as an assist in dermatotraction to close open NF fasciotomy wounds. The authors present the clinical results, followed by a discussion of the clinical basis of extended NPWT-assisted dermatotraction. Methods A retrospective case series of eight patients with NF who underwent open fasciotomy was approved for the study. After serial wound preparation, dermatotraction was applied in a shoelace manner using elastic vessel loops. Next, the extended NPWT was applied over the wound. The sponge was three times wider than the wound width, and the transparent covering drape almost encircled the anatomical wound area. The negative pressure of the NPWT was set at a continuous 100 mmHg by suction barometer. The clinical outcome was assessed based on wound area reduction after treatment and by the achievement of direct wound closure. Results After the first set of extended NPWT-assisted dermatotraction procedures, the mean wound area was significantly decreased (658.12 cm2 to 29.37 cm2; p = 0.002), as five out of eight patients achieved direct wound closure. One patient with a chest wall defect underwent latissimus dorsi musculocutaneous flap coverage, with primary closure of the donor site. Two Fournier’s gangrene patients underwent multiple sets of treatment and finally achieved secondary wound closure with skin grafts. The patients were followed up for 18.3 months on average and showed satisfactory results without wound recurrence. Conclusions Extended NPWT-assisted dermatotraction advances scarred, stiff fasciotomy wound margins synergistically in NF and allows direct closure of the wound without complications. This method can be another good treatment option for the NF patient with large open wounds whose general condition is unsuitable for extensive reconstructive surgery. PMID:24731449

  5. DEVELOPMENT OF AN INSOLUBLE SALT SIMULANT TO SUPPORT ENHANCED CHEMICAL CLEANING TESTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eibling, R

    The closure process for high level waste tanks at the Savannah River Site will require dissolution of the crystallized salts that are currently stored in many of the tanks. The insoluble residue from salt dissolution is planned to be removed by an Enhanced Chemical Cleaning (ECC) process. Development of a chemical cleaning process requires an insoluble salt simulant to support evaluation tests of different cleaning methods. The Process Science and Engineering section of SRNL has been asked to develop an insoluble salt simulant for use in testing potential ECC processes (HLE-TTR-2007-017). An insoluble salt simulant has been developed based uponmore » the residues from salt dissolution of saltcake core samples from Tank 28F. The simulant was developed for use in testing SRS waste tank chemical cleaning methods. Based on the results of the simulant development process, the following observations were developed: (1) A composition based on the presence of 10.35 grams oxalate and 4.68 grams carbonate per 100 grams solids produces a sufficiently insoluble solids simulant. (2) Aluminum observed in the solids remaining from actual waste salt dissolution tests is probably precipitated from sodium aluminate due to the low hydroxide content of the saltcake. (3) In-situ generation of aluminum hydroxide (by use of aluminate as the Al source) appears to trap additional salts in the simulant in a manner similar to that expected for actual waste samples. (4) Alternative compositions are possible with higher oxalate levels and lower carbonate levels. (5) The maximum oxalate level is limited by the required Na content of the insoluble solids. (6) Periodic mixing may help to limit crystal growth in this type of salt simulant. (7) Long term storage of an insoluble salt simulant is likely to produce a material that can not be easily removed from the storage container. Production of a relatively fresh simulant is best if pumping the simulant is necessary for testing purposes. The insoluble salt simulant described in this report represents the initial attempt to represent the material which may be encountered during final waste removal and tank cleaning. The final selected simulant was produced by heating and evaporation of a salt slurry sample to remove excess water and promote formation and precipitation of solids with solubility characteristics which are consistent with actual tank insoluble salt samples. The exact anion composition of the final product solids is not explicitly known since the chemical components in the final product are distributed between the solid and liquid phases. By combining the liquid phase analyses and total solids analysis with mass balance requirements a calculated composition of assumed simple compounds was obtained and is shown in Table 0-1. Additional improvements to and further characterization of the insoluble salt simulant are possible. During the development of these simulants it was recognized that: (1) Additional waste characterization on the residues from salt dissolution tests with actual waste samples to determine the amount of species such as carbonate, oxalate and aluminosilicate would allow fewer assumptions to be made in constructing an insoluble salt simulant. (2) The tank history will impact the amount and type of insoluble solids that exist in the salt dissolution solids. Varying the method of simulant production (elevated temperature processing time, degree of evaporation, amount of mixing (shear) during preparation, etc.) should be tested.« less

  6. Department of Clinical Investigation, Annual Research Progress Report, Fiscal Year 2007 (Madigan Army Medical Center)

    DTIC Science & Technology

    2007-09-30

    Midyer Clinical Mtg, Anaheim, CA, December 2006. Hudak ME. Consequences of Triple Therapy: Evaluation of Bleeding and Embolic Events in a Cohort of...6.5 mm cancellous screws in acute Jones fractures . Foot Ankle Int, 27(10): p. 821-5, 2006. Woebkenberg BJ, Devine JG, Rush R, Starnes B, Stinger H...Closure System Versus Best Medical Therapy in Patients with a Stroke and/or Transient Ischemic Attack Due to a Presumed Paradoxical Embolism Through

  7. General solutions to multiple testing problems. Translation of "Sonnemann, E. (1982). Allgemeine Lösungen multipler Test probleme. EDV in Medizin und Biologie 13(4), 120-128".

    PubMed

    Sonnemann, Eckart

    2008-10-01

    The introduction of sequentially rejective multiple test procedures (Einot and Gabriel, 1975; Naik, 1975; Holm, 1977; Holm, 1979) has caused considerable progress in the theory of multiple comparisons. Emphasizing the closure of multiple tests we give a survey of the general theory and its recent results in applications. Some new applications are given including a discussion of the connection with the theory of confidence regions.

  8. An evidence-based approach to medication preparation for the surgical patient at risk for latex allergy: is it time to stop being stopper poppers?

    PubMed

    Heitz, James W; Bader, Stephen O

    2010-09-01

    The prevalence of latex allergy is increasing in surgical patient populations. Avoidance of exposure to the allergen is essential to minimizing perioperative complications in patients suspected to be at risk. Natural rubber latex has historically been ubiquitous in medical devices containing rubber. In 1998, the Food and Drug Administration (FDA) began to require the labeling of medical devices made from natural rubber latex; since that time substantial progress has been made in identifying latex-free alternatives. However, the rubber stoppers commonly found in pharmaceutical vial closures are exempt from FDA labeling requirements. Examination of the clinical and basic science literature regarding pharmaceutical vial closures supports limiting the rubber stopper to a single needle puncture as a safer practice, with the caveat that no strategy exists for the complete elimination of risk as long as stoppers made from natural rubber latex are used in pharmaceutical vials intended for human use. Copyright © 2010 Elsevier Inc. All rights reserved.

  9. [Gastric perforation caused by primary gastric diffuse large B cell lymphoma].

    PubMed

    Kim, Ju Seok; Rou, Woo Sun; Ahn, Byung Moo; Moon, Hee Seok; Kang, Sun Hyung; Sung, Jae Kyu; Jeong, Hyun Yong; Song, Kyu-Sang

    2015-01-01

    Spontaneous gastric perforation is a rare complication of gastric lymphoma that is potentially life threatening since it can progress to sepsis and multi-organ failure. Morbidity also increases due to prolonged hospitalization and delay in initiating chemotherapy. Therefore prompt diagnosis and appropriate treatment is critical to improve prognosis. A 64-year-old man presented to the emergency department with severe abdominal pain. Chest X-ray showed free air below the right diaphragm. Abdominal CT scan also demonstrated free air in the peritoneal cavity with large wall defect in the lesser curvature of gastric lower body. Therefore, the patient underwent emergency operation and primary closure was done. Pathologic specimen obtained during surgery was compatible to diffuse large B cell lymphoma. Fifteen days after primary closure, the patient received subtotal gastrectomy and chemotherapy was initiated after recovery. Patient is currently being followed-up at outpatient department without any particular complications. Herein, we report a rare case of gastric lymphoma that initially presented as peritonitis because of spontaneous gastric perforation.

  10. Coronary artery surgery: indications and recent experience.

    PubMed Central

    Robinson, P. S.; Coltart, D. J.; Jenkins, B. S.; Webb-Peploe, M. M.; Braimbridge, M. V.; Williams, B. T.

    1978-01-01

    The comprehensive experience of coronary artery surgery in a Cardiothoracic Unit over a 31-month period is reviewed. Hospital mortality for elective bypass grafting was 3.9% overall and 2.5% in those with good pre-operative left ventricular function. Major influences on hospital mortality were pre-operative left ventricular function, extent of coronary artery disease and extent of the surgical procedure undertaken in terms of number of aortocoronary grafts inserted, coronary endarterectomy and particularly concomitant valve surgery or aneurysm resection. Follow-up experience shows 74% of grafted patients to be symptom-free and 85% symptomatically improved one year after surgery with 70% symptom-free and 80% improved at two years. Early post-operative deaths appear related to early graft closure and recurrence of symptoms postoperatively to late graft closure or progression of coronary disease in the native circulation. The study provides a guide to the relative risks of coronary artery surgery for symptomatic coronary artery disease and expected symptomatic results in the early follow-up period. PMID:310999

  11. Geology of the Badak field, east Kalimantan, Indonesia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gwinn, J.W.; Helmig, H.M.; Kartaadipoetra, L.W.

    1974-01-01

    The Badak field was discovered in Jan. 1972. It is located on the coast of E. Kalimantan (Borneo), about 35 km northeast of the provincial capital of Samarinda. Oil and gas were found in a multitude of deltaic sandstone beds of middle Miocene to Pliocene age, between 4,500 and 11,000 ft. The structure is a broad anticline with flanks dipping less than 10' areal closure of roughly 40 sq km and vertical closure up to 1,000 ft depending on the depth. The majority of the closed reservoirs contain gas and condensate and the structure appears to be filled to itsmore » spill point. Oil occurs in some sands on the crest of the anticline and in oil rings below gas in several reservoirs. At this date, exploration for oil rings on the flanks of Badak anticline is still in progress. Recoverable reserves in the Badak field are estimated to be in excess of 6 trillion standard cu ft of hydrocarbon gas and 55 million bbl of hydrocarbon liquids.« less

  12. Towards full-Braginskii implicit extended MHD

    NASA Astrophysics Data System (ADS)

    Chacon, Luis

    2009-05-01

    Recently, viable algorithms have been proposed for the scalable, fully-implicit temporal integration of 3D resistive MHD and cold-ion extended MHD models. While significant, these achievements must be tempered by the fact that such models lack predictive capabilities in regimes of interest for magnetic fusion. Short of including kinetic closures, a natural evolution path towards predictability starts by considering additional terms as described in Braginskii's fluid closures in the collisional regime. Here, we focus on the inclusion of two fundamental elements of relevance for fusion plasmas: anisotropic parallel electron transport, and warm-ion physics (i.e., ion finite Larmor radius effects, included via gyroviscosity). Both these elements introduce significant numerical difficulties, due to the strong anisotropy in the former, and the presence of dispersive waves in the latter. In this presentation, we will discuss progress in our fully implicit algorithmic formulation towards the inclusion of both these elements. L. Chac'on, Phys. Plasmas, 15, 056103 (2008) L. Chac'on, J. Physics: Conf. Series, 125, 012041 (2008)

  13. Comparison of Negative Pressure Wound Therapy and Silver-Coated Foam Dressings in Open Wound Treatment in Dogs: A Prospective Controlled Clinical Trial.

    PubMed

    Nolff, Mirja C; Albert, Rebecca; Reese, Sven; Meyer-Lindenberg, Andrea

    2018-06-11

     To evaluate negative pressure wound therapy (NPWT) for treatment of complicated wounds in dogs.  Prospective randomized clinical study MATERIALS AND METHODS:  Dogs ( n  = 26) undergoing open-wound treatment were randomly assigned to one of two groups: Group A ( n  = 13) NPWT; Group B ( n  = 13) silver-coated foam dressing. Pairs of patients were matched based on wound conformation, localization, and underlying cause and compared in terms of duration of previous treatment, development of wound size (wound planimetry), time to closure, bacterial bio-burden and complications. Wound dressing changes were performed every 3 days during the first 9 days of therapy for both groups. Statistical analysis was performed.  Pre-treatment signalment and bacterial status were comparable between groups. Total time to closure was significantly ( p  = 0.018) shorter in Group A (14.2 days) compared with Group B (28.6 days), and wound planimetry on days 3, 6 and 9 showed significant greater reduction in total wound area for Group A at all-time points ( p  < 0.05). Furthermore, wounds in Group A showed less progression of local infection than did wounds in Group B ( p  = 0.01).  NPWT-treated wounds showed faster closure, improved macro-deformation and less local signs of infection. Schattauer GmbH Stuttgart.

  14. Intrasocket reactive soft tissue for primary closure after augmentation of extraction sites with severe bone loss before implant placement.

    PubMed

    Mardinger, Ofer; Chaushu, Gavriel; Ghelfan, Oded; Nissan, Joseph

    2009-06-01

    The normal bone resorption after tooth extraction can be significantly aggravated in the case of pre-existing severe bone loss and chronic infection. Bone augmentation procedures have been proposed, but they require adequate closure of soft tissues. We propose the use of intrasocket reactive tissue to cover extraction sites augmented by bovine bone mineral graft to promote the success of the graft procedure. The study included 24 patients with severe bone loss and chronic pathology in 27 sites. The intrasocket reactive soft tissue was elevated from the bony walls in a subperiosteal plane. Porous bovine or allograft bone mineral was placed in the extraction site without membranes, and the intrasocket reactive soft tissue was sutured over the grafting material to seal the coronal portion of the socket. Twenty-seven implants were placed 6 months after bone augmentation. Healing progressed uneventfully. Postoperative morbidity was minimal. There was no leakage or infection of the grafting material. The mean time to implant placement was 7.8 months. Supplemental augmentation was not needed. There were no implant failures. Follow-up ranged from 6 to 36 months (mean, 15 months). All implants were rehabilitated with fixed prostheses. Intrasocket reactive soft tissue can be used predictably to obtain primary closure of augmented extraction sites with severe bone loss with minimal postoperative morbidity.

  15. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  16. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  17. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  18. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  19. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  20. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  1. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  2. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  3. Dual therapeutic functions of F-5 fragment in burn wounds: preventing wound progression and promoting wound healing in pigs.

    PubMed

    Bhatia, Ayesha; O'Brien, Kathryn; Chen, Mei; Wong, Alex; Garner, Warren; Woodley, David T; Li, Wei

    2016-01-01

    Burn injuries are a leading cause of morbidity including prolonged hospitalization, disfigurement, and disability. Currently there is no Food and Drug Administration-approved burn therapeutics. A clinical distinction of burn injuries from other acute wounds is the event of the so-called secondary burn wound progression within the first week of the injury, in which a burn expands horizontally and vertically from its initial boundary to a larger area. Therefore, an effective therapeutics for burns should show dual abilities to prevent the burn wound progression and thereafter promote burn wound healing. Herein we report that topically applied F-5 fragment of heat shock protein-90α is a dual functional agent to promote burn wound healing in pigs. First, F-5 prevents burn wound progression by protecting the surrounding cells from undergoing heat-induced caspase 3 activation and apoptosis with increased Akt activation. Accordingly, F-5-treated burn and excision wounds show a marked decline in inflammation. Thereafter, F-5 accelerates burn wound healing by stimulating the keratinocyte migration-led reepithelialization, leading to wound closure. This study addresses a topical agent that is capable of preventing burn wound progression and accelerating burn wound healing.

  4. Hydrazine monopropellant reciprocating engine development

    NASA Technical Reports Server (NTRS)

    Akkerman, J. W.

    1979-01-01

    A hydrazine fueled piston engine for providing 11.2 kW was developed to satisfy the need for an efficient power supply in the range from 3.7 to 74.6 kW where existing nonair-breathing power supplies such as fuel cells or turbines are inappropriate. The engine was developed for an aircraft to fly to 21.3 km and above and cruise for extended periods. A remotely piloted aircraft and the associated flight control techniques for this application were designed. The engine is geared down internally (2:1) to accommodate a 1.8 m diameter propeller. An alternator is included to provide electrical power. The pusher-type engine is mounted onto the aft closure of the fuel tank, which also provides mounting for all other propulsion equipment. About 20 hrs of run time demonstrated good efficiency and adequate life. One flight test to 6.1 km was made using the engine with a small fixed-pitch four-bladed propeller. The test was successful in demonstrating operational characteristics and future potential.

  5. Risk Management Approach & Progress in Cd and Cr6+ Elimination

    DTIC Science & Technology

    2014-11-18

    Documentation Available by 2015? Gaps Conversion Coating- Aluminum Avionics/Electrical- Class 3 9 7 Medium yes- joint service/OEM/ NASA effort to...Optimized conditions validated by NASA . – FRC validation: immersion process – Based on data from the lab Surtec 650V optimization, an 1800-gallon tank...acting similarly, 650V not • Plans: scale up to 80 gallon process line; assess Metalast TCP/HF- EPA and Henkel products; further study 650V

  6. Sonic Cavitation in Water

    DTIC Science & Technology

    1970-07-06

    SOiC 0~iAstim in -Water CIamU L Dona, Me".d and Syste m uc Uuimrwtv, Somu Refewwic Dhxwuox Jul 6, 190 DOC OWVL, RESARMHLAWMOft ft DISCLAIMER NOTICE...to progress in understanding these anomalies. It appears that many marine organisms can exude into the sea (or into a towing tank) high-polymer...show less tendency to cavitate in a blow- down tunnel. Among these organisms are algae, about which Encyclopedia Brittanica says: "Algae are invaluable

  7. Development and Demonstration of Material Properties Database and Software for the Simulation of Flow Properties in Cementitious Materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, F.; Flach, G.

    This report describes work performed by the Savannah River National Laboratory (SRNL) in fiscal year 2014 to develop a new Cementitious Barriers Project (CBP) software module designated as FLOExcel. FLOExcel incorporates a uniform database to capture material characterization data and a GoldSim model to define flow properties for both intact and fractured cementitious materials and estimate Darcy velocity based on specified hydraulic head gradient and matric tension. The software module includes hydraulic parameters for intact cementitious and granular materials in the database and a standalone GoldSim framework to manipulate the data. The database will be updated with new data asmore » it comes available. The software module will later be integrated into the next release of the CBP Toolbox, Version 3.0. This report documents the development efforts for this software module. The FY14 activities described in this report focused on the following two items that form the FLOExcel package; 1) Development of a uniform database to capture CBP data for cementitious materials. In particular, the inclusion and use of hydraulic properties of the materials are emphasized; and 2) Development of algorithms and a GoldSim User Interface to calculate hydraulic flow properties of degraded and fractured cementitious materials. Hydraulic properties are required in a simulation of flow through cementitious materials such as Saltstone, waste tank fill grout, and concrete barriers. At SRNL these simulations have been performed using the PORFLOW code as part of Performance Assessments for salt waste disposal and waste tank closure.« less

  8. Guidelines for VCCT-Based Interlaminar Fatigue and Progressive Failure Finite Element Analysis

    NASA Technical Reports Server (NTRS)

    Deobald, Lyle R.; Mabson, Gerald E.; Engelstad, Steve; Prabhakar, M.; Gurvich, Mark; Seneviratne, Waruna; Perera, Shenal; O'Brien, T. Kevin; Murri, Gretchen; Ratcliffe, James; hide

    2017-01-01

    This document is intended to detail the theoretical basis, equations, references and data that are necessary to enhance the functionality of commercially available Finite Element codes, with the objective of having functionality better suited for the aerospace industry in the area of composite structural analysis. The specific area of focus will be improvements to composite interlaminar fatigue and progressive interlaminar failure. Suggestions are biased towards codes that perform interlaminar Linear Elastic Fracture Mechanics (LEFM) using Virtual Crack Closure Technique (VCCT)-based algorithms [1,2]. All aspects of the science associated with composite interlaminar crack growth are not fully developed and the codes developed to predict this mode of failure must be programmed with sufficient flexibility to accommodate new functional relationships as the science matures.

  9. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  10. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  11. Carotid artery disease progression and related neurologic events after carotid endarterectomy.

    PubMed

    Avgerinos, Efthymios D; Go, Catherine; Ling, Jennifer; Naddaf, Abdallah; Steinmetz, Amy; Abou Ali, Adham N; Makaroun, Michel S; Chaer, Rabih A

    2016-08-01

    During the last decade, there has been a dramatic improvement in best medical treatment for patients with vascular disease. Yet, there is a paucity of contemporary long-term data for restenosis and contralateral internal carotid artery (ICA) progression. This study assessed ipsilateral and contralateral disease progression and cerebrovascular events after carotid endarterectomy (CEA). A consecutive cohort of CEAs between January 1, 2000, and December 31, 2010, was retrospectively analyzed. End points were restenosis ≥50% and ≥70%, contralateral carotid disease progression (50%-69%, 70%-99%, or occlusion) and stroke. Survival analysis and Cox regression models were used to assess the effect of baseline predictors. During the 11-year study period, 1639 patients underwent 1782 CEAs (50.0% patch closure, 23.9% primary closure, 26.1% eversion, and 2.5% combined with coronary artery bypass grafting). The combined stroke/death rate was 2.6% overall and 1.8% in the asymptomatic cohort. The rate of restenosis ≥50% at 2, 5, and 10 years was 8.5%, 15.6%, 27.2%, and the rate for restenosis ≥70% was 3.4%, 6.5%, 10.2%, respectively. Restenosis ≥50% was predicted by hypertension (hazard ratio [HR], 2.09; P = .027), female gender (HR, 1.43; P = .042), and younger age (≤65 years; HR, 1.56; P = .016), but not by statins, surgical technique, symptoms, or other baseline risk factors. Restenoses remained asymptomatic in 125 of 148 (84.5%). Progression of contralateral ICA disease at 2, 5, and 10 years was estimated at 5.4%, 15.5%, and 46.8%, respectively. Contralateral progression was only predicted by smoking (HR, 1.74; P = .008). The stroke rate in patients with disease progression of the contralateral ICA was not different compared with those without progression (7.0% vs 3.3%; P = .063). Any-stroke rates at 2, 5, and 10 years were 4.6%, 7.3%, and 15.7%, respectively. Predictors were symptomatic lesion (HR, 1.48; P = .039), renal insufficiency, defined as a glomerular filtration rate (GFR) of 30 to 59 vs <30 mL/min/1.73 m 2 (HR, 0.34; P = .009) or GFR ≥60 vs GFR <30 mL/min/1.73 m 2 (HR, 0.55; P = .109), and statin use (HR, 0.59; P = .006). Restenosis or contralateral disease progression after CEA, to a level that might warrant consideration for treatment, is very low. The potentially associated stroke rates are also very low and not clearly related to disease progression. With the exception of the postoperative duplex, surveillance within short intervals of <1 or 2 years cannot be justified. Copyright © 2016 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.

  12. 40 CFR 264.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 264.146 Section 264.146 Protection of Environment... mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or more...

  13. Developing and upgrading of solar system thermal energy storage simulation models. Technical progress report, March 1, 1979-February 29, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuhn, J K; von Fuchs, G F; Zob, A P

    1980-05-01

    Two water tank component simulation models have been selected and upgraded. These models are called the CSU Model and the Extended SOLSYS Model. The models have been standardized and links have been provided for operation in the TRNSYS simulation program. The models are described in analytical terms as well as in computer code. Specific water tank tests were performed for the purpose of model validation. Agreement between model data and test data is excellent. A description of the limitations has also been included. Streamlining results and criteria for the reduction of computer time have also been shown for both watermore » tank computer models. Computer codes for the models and instructions for operating these models in TRNSYS have also been included, making the models readily available for DOE and industry use. Rock bed component simulation models have been reviewed and a model selected and upgraded. This model is a logical extension of the Mumma-Marvin model. Specific rock bed tests have been performed for the purpose of validation. Data have been reviewed for consistency. Details of the test results concerned with rock characteristics and pressure drop through the bed have been explored and are reported.« less

  14. Enhancing capacity for risk factor surveillance at the regional/local level: a follow-up review of the findings of the Canadian Think Tank Forum after 4 years.

    PubMed

    Choi, Bernard Ck; Decou, Mary Lou; Rasali, Drona; Martens, Patricia J; Mancuso, Michelina; Plotnikoff, Ronald C; Neudorf, Cory; Thanos, Joanne; Svenson, Lawrence W; Denny, Keith; Orpana, Heather; Stewart, Paula; King, Michael; Griffith, Jane; Erickson, Tannis; van Dorp, Renate; White, Deanna; Ali, Amira

    2014-01-22

    National health surveys are sometimes used to provide estimates on risk factors for policy and program development at the regional/local level. However, as regional/local needs may differ from national ones, an important question is how to also enhance capacity for risk factor surveillance regionally/locally. A Think Tank Forum was convened in Canada to discuss the needs, characteristics, coordination, tools and next steps to build capacity for regional/local risk factor surveillance. A series of follow up activities to review the relevant issues pertaining to needs, characteristics and capacity of risk factor surveillance were conducted. Results confirmed the need for a regional/local risk factor surveillance system that is flexible, timely, of good quality, having a communication plan, and responsive to local needs. It is important to conduct an environmental scan and a gap analysis, to develop a common vision, to build central and local coordination and leadership, to build on existing tools and resources, and to use innovation. Findings of the Think Tank Forum are important for building surveillance capacity at the local/county level, both in Canada and globally. This paper provides a follow-up review of the findings based on progress over the last 4 years.

  15. Enumeration and Characterization of Acidophilic Microorganisms Isolated from a Pilot Plant Stirred-Tank Bioleaching Operation

    PubMed Central

    Okibe, Naoko; Gericke, Mariekie; Hallberg, Kevin B.; Johnson, D. Barrie

    2003-01-01

    Microorganisms were enumerated and isolated on selective solid media from a pilot-scale stirred-tank bioleaching operation in which a polymetallic sulfide concentrate was subjected to biologically accelerated oxidation at 45°C. Four distinct prokaryotes were isolated: three bacteria (an Acidithiobacillus caldus-like organism, a thermophilic Leptospirillum sp., and a Sulfobacillus sp.) and one archaeon (a Ferroplasma-like isolate). The relative numbers of these prokaryotes changed in the three reactors sampled, and the Ferroplasma isolate became increasingly dominant as mineral oxidation progressed, eventually accounting for >99% of plate isolates in the third of three in-line reactors. The identities of the isolates were confirmed by analyses of their 16S rRNA genes, and some key physiological traits (e.g., oxidation of iron and/or sulfur and autotrophy or heterotrophy) were examined. More detailed studies were carried out with the Leptospirillum and Ferroplasma isolates. The data presented here represent the first quantitative study of the microorganisms in a metal leaching situation and confirm that mixed cultures of iron- and sulfur-oxidizing prokaryotic acidophiles catalyze the accelerated dissolution of sulfidic minerals in industrial tank bioleaching operations. The results show that indigenous acidophilic microbial populations change as mineral dissolution becomes more extensive. PMID:12676667

  16. Coupling of ions to superconducting circuits

    NASA Astrophysics Data System (ADS)

    Moeller, Soenke; Daniilidis, Nikos; Haeffner, Hartmut

    2013-05-01

    We present experimental progress towards coupling the motion of ion strings to the resonant mode of a superconducting high-quality tank circuit. We consider such a coupling as the first step towards interfacing trapped ions with superconducting qubits. In our demonstration experiment, we aim to reduce the temperature of the resonant mode of the tank circuit by extracting energy from the circuit via laser cooling an ion string. One of the main experimental challenges is to construct a tank circuit with such a high quality factor Q that the ion-resonator coupling exceeds the environment-resonator coupling. Currently, we achieve Q = 60 000 at a frequency of ω = 2 π . 5 . 7 MHz . For this mode, the coupling time-scale to the environment is on the order of 50 Hz. We plan to use a trap with an ion-electrode distance on the order of 100 μm resulting in an ion-resonator coupling of 1kHz. This coupling should reduce the electronic temperature of the resonant mode by a factor of 80 below the ambient temperature. For our trap geometry we expect a minimum trap depth of 50 meV for a trap drive frequency of 52 MHz with a 200 V amplitude. This results radial trap frequencies of 5 . 7 MHz . Research funded by DARPA grant #N66001-12-1-4234.

  17. 40 CFR 265.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 265.146 Section 265.146 Protection of Environment... Use of a mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or...

  18. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  19. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Undrground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  20. Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  1. Matlab GUI for a Fluid Mixer

    NASA Technical Reports Server (NTRS)

    Barbieri, Enrique

    2005-01-01

    The Test and Engineering Directorate at NASA John C. Stennis Space Center developed an interest to study the modeling, evaluation, and control of a liquid hydrogen (LH2) and gas hydrogen (GH2) mixer subsystem of a ground test facility. This facility carries out comprehensive ground-based testing and certification of liquid rocket engines including the Space Shuttle Main engine. A software simulation environment developed in MATLAB/SIMULINK (M/S) will allow NASA engineers to test rocket engine systems at relatively no cost. In the progress report submitted in February 2004, we described the development of two foundation programs, a reverse look-up application using various interpolation algorithms, a variety of search and return methods, and self-checking methods to reduce the error in returned search results to increase the functionality of the program. The results showed that these efforts were successful. To transfer this technology to engineers who are not familiar with the M/S environment, a four-module GUI was implemented allowing the user to evaluate the mixer model under open-loop and closed-loop conditions. The progress report was based on an udergraduate Honors Thesis by Ms. Jamie Granger Austin in the Department of Electrical Engineering and Computer Science at Tulane University, during January-May 2003, and her continued efforts during August-December 2003. In collaboration with Dr. Hanz Richter and Dr. Fernando Figueroa we published these results in a NASA Tech Brief due to appear this year. Although the original proposal in 2003 did not address other components of the test facility, we decided in the last few months to extend our research and consider a related pressurization tank component as well. This report summarizes the results obtained towards a Graphical User Interface (GUI) for the evaluation and control of the hydrogen mixer subsystem model and for the pressurization tank each taken individually. Further research would combine the two components - mixer and tank, for a more realistic simulation tool.

  2. Summary of Research, Academic Departments, 1982-1983.

    DTIC Science & Technology

    1983-10-01

    Office to pursue fur- - and the production of towing tank models is de - ther proof of concept tests and seek improvements ,’ scribed. The design...followed b" Haskind. Rci,,ncr. * as "Cable Fire Studies: Progress Report in Evaluation of Timman, van de Vooren and Greidanus. and Release Rate Apparatus...diameter of the in the capture chamber have been compared with a system is increased, the draft of the device is de - limited amount of experimental data

  3. Ritanserin-sensitive receptors modulate the prosocial and the anxiolytic effect of MDMA derivatives, DOB and PMA, in zebrafish.

    PubMed

    Ponzoni, Luisa; Sala, Mariaelvina; Braida, Daniela

    2016-11-01

    Little is known about the pharmacological effects of amphetamine derivatives. In the present study, the effect on social preference and anxiety-like behavior of 2,5-dimetoxy-4-bromo-amphetamine hydrobromide (DOB) and para-methoxyamphetamine (PMA), in comparison with 3,4 methylenedioxymethamphetamine (MDMA) was investigated in zebrafish, an emerging model to study emotional behavior in an inexpensive and quick manner. DOB (0.05-2mg/kg), PMA (0.0005-2mg/kg) or MDMA (0.25-20mg/kg), given i.m. to adult zebrafish, progressively increased the time spent in the proximity of nacre fish picture in a social preference test. However, high doses were ineffective. Similarly, in the novel tank diving and light-dark tests the compounds elicited a progressive anxiolytic effect in terms of time spent in the upper half of the tank and in the light compartment, respectively. All the above effects were interpolated by symmetrical parabolas. The 5-HT2A/C antagonist ritanserin (0.025-2.5mg/kg) in association with the maximal effective dose of MDMA, DOB and PMA blocked both the social and anxiolytic effect. Taken together these findings demonstrate for the first time the prosocial and anxiolytic properties of DOB and PMA and focus on the mechanisms of their action through the serotonergic-like system suggesting a potential clinical application. Copyright © 2016 Elsevier B.V. All rights reserved.

  4. Laser ablation/ionization characterization of solids: Second interim progress report of the strategic environmental research development program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hess, W.P.; Bushaw, B.A.; McCarthy, M.I.

    1996-10-01

    The Department of Energy is undertaking the enormous task of remediating defense wastes and environmental insults which have occurred over 50 years of nuclear weapons production. It is abundantly clear that significant technology advances are needed to characterize, process, and store highly radioactive waste and to remediate contaminated zones. In addition to the processing and waste form issues, analytical technologies needed for the characterization of solids, and for monitoring storage tanks and contaminated sites do not exist or are currently expensive labor-intensive tasks. This report describes progress in developing sensitive, rapid, and widely applicable laser-based mass spectrometry techniques for analysismore » of mixed chemical wastes and contaminated soils.« less

  5. Modeling Quasi-Static and Fatigue-Driven Delamination Migration

    NASA Technical Reports Server (NTRS)

    De Carvalho, N. V.; Ratcliffe, J. G.; Chen, B. Y.; Pinho, S. T.; Baiz, P. M.; Tay, T. E.

    2014-01-01

    An approach was proposed and assessed for the high-fidelity modeling of progressive damage and failure in composite materials. It combines the Floating Node Method (FNM) and the Virtual Crack Closure Technique (VCCT) to represent multiple interacting failure mechanisms in a mesh-independent fashion. Delamination, matrix cracking, and migration were captured failure and migration criteria based on fracture mechanics. Quasi-static and fatigue loading were modeled within the same overall framework. The methodology proposed was illustrated by simulating the delamination migration test, showing good agreement with the available experimental data.

  6. Center for Modeling of Turbulence and Transition (CMOTT): Research Briefs, 1992

    NASA Technical Reports Server (NTRS)

    Liou, William W. (Editor)

    1992-01-01

    The progress is reported of the Center for Modeling of Turbulence and Transition (CMOTT). The main objective of the CMOTT is to develop, validate and implement the turbulence and transition models for practical engineering flows. The flows of interest are three-dimensional, incompressible and compressible flows with chemical reaction. The research covers two-equation (e.g., k-e) and algebraic Reynolds-stress models, second moment closure models, probability density function (pdf) models, Renormalization Group Theory (RNG), Large Eddy Simulation (LES) and Direct Numerical Simulation (DNS).

  7. The mammalian blastema: regeneration at our fingertips

    PubMed Central

    Simkin, Jennifer; Sammarco, Mimi C.; Dawson, Lindsay A.; Schanes, Paula P.; Yu, Ling

    2015-01-01

    Abstract In the mouse, digit tip regeneration progresses through a series of discrete stages that include inflammation, histolysis, epidermal closure, blastema formation, and redifferentiation. Recent studies reveal how each regenerative stage influences subsequent stages to establish a blastema that directs the successful regeneration of a complex mammalian structure. The focus of this review is on early events of healing and how an amputation wound transitions into a functional blastema. The stepwise formation of a mammalian blastema is proposed to provide a model for how specific targeted treatments can enhance regenerative performance in humans. PMID:27499871

  8. Department of Defense Landfill Database: A Collection of DoD-Wide Landfill Data for the Assessment of Implementing the Flex Energy Powerstation for Landfill Gas to Energy Projects

    DTIC Science & Technology

    2011-06-01

    Microturbine. Given the approximate nature of the source data and the gas production models , this material can only be used for a preliminary assessment...methane generation rate, k, used in the first order decay model can vary widely from landfill to landfill and are partly dependent on waste composition...State Status (active/closed/ closure in progress) Gross Power Generation Potential (kW) 345 ARMY WHITE SANDS MISSLE RANGE DONA ANA NM ACTIVE

  9. Environmental Problems Associated With Decommissioning The Chernobyl Nuclear Power Plant Cooling Pond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farfan, E. B.; Jannik, G. T.; Marra, J. C.

    2009-11-09

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. Inmore » addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.« less

  10. ENVIRONMENTAL PROBLEMS ASSOCIATED WITH DECOMMISSIONING THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farfan, E.

    2009-09-30

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. Inmore » addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.« less

  11. Functional and Structural Changes in a Canine Model of Hereditary Primary Angle-Closure Glaucoma

    PubMed Central

    Kecova, Helga; Harper, Matthew M.; Nilaweera, Wijitha; Kuehn, Markus H.; Kardon, Randy H.

    2010-01-01

    Purpose. To characterize functional and structural changes in a canine model of hereditary primary angle-closure glaucoma. Methods. Intraocular pressure (IOP) was evaluated with tonometry in a colony of glaucomatous dogs at 8, 15, 18, 20, and 30 months of age. Retinal function was evaluated using electroretinography (scotopic, photopic, and pattern). Examination of anterior segment structures was performed using gonioscopy and high-frequency ultrasonography (HFU). Results. A gradual rise in IOP was observed with an increase in age: 8 months, 14 mm Hg (median value); 15 months, 15.5 mm Hg; 18 months, 17.5 mm Hg; 20 months, 24 mm Hg; 30 months, 36 mm Hg. Provocative testing with mydriatic agents (tropicamide and atropine 1%) caused significant increases in IOP (35% and 50%, respectively). HFU analysis showed complete collapse of iridocorneal angles by 20 months of age. Scotopic and photopic ERG analysis did not reveal significant deficits, but pattern ERG analysis showed significantly reduced amplitudes in glaucomatous dogs (glaucoma, 3.5 ± 0.4 μV; control, 6.2 ± 0.3 μV; P = 0.004; Student's t-test). Histologic analysis revealed collapse of the iridocorneal angle, posterior bowing of the lamina cribrosa, swelling and loss of large retinal ganglion cells, increased glial reactivity, and increased thickening of the lamina cribrosa. Conclusions. Canine hereditary angle-closure glaucoma is characterized by a progressive increase in intraocular pressure, loss of optic nerve function, and retinal ganglion cell loss. PMID:19661222

  12. Transcatheter closure of patent ductus arteriosus reverses left ventricular dysfunction in a septuagenarian.

    PubMed

    Rapacciuolo, Antonio; Losi, Maria Angela; Borgia, Francesco; De Angelis, Maria Carmen; Esposito, Francesca; Cavallaro, Massimo; De Rosa, Roberta; Piscione, Federico; Chiariello, Massimo

    2009-04-01

    A 70-year-old man was admitted because of a 6-month history of progressive dyspnoea on exertion. The medical history showed that he suffered from patent ductus arteriosus (PDA) that was closed at 35 years of age by surgical ligation. Subsequently, up to year 1992, no evidence of residual left-to-right shunt was found. When he first came to our attention, we performed an echocardiographic test evidencing left ventricular dilation and contractile dysfunction and a recurrence of PDA. To exclude other possible causes of congestive heart failure, we performed several tests, including a coronary angiogram that showed coronary atherosclerosis without significant lesions. The haemodynamic study confirmed that the PDA was associated with a mild pulmonary hypertension with a QP: QS of 2: 1. The patient did not report any cardiovascular risk factor. Therefore, we concluded that PDA was responsible for congestive heart failure in this patient. We performed percutaneous closure of PDA, which was able to reverse left ventricular dilation and dysfunction, improving the patient's symptoms, at 1 month as well as 4 months after the interventional procedure. Although this kind of device is frequently used in the paediatric population, adult patients may present different challenges in proper management, such as poor visualization, calcification and pulmonary hypertension. In the description of the case reported here, we show that a PDA can present as congestive heart failure in the elderly. Percutaneous closure can be very effective in ameliorating left ventricular performance as well as symptoms.

  13. Annual report to Congress. Department of Energy activities relating to the Defense Nuclear Facilities Safety Board, calendar year 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2001-03-01

    This Annual Report to the Congress describes the Department of Energy's activities in response to formal recommendations and other interactions with the Defense Nuclear Facilities Safety Board. During 2000, the Department completed its implementation and proposed closure of one Board recommendation and completed all implementation plan milestones associated with two additional Board recommendations. Also in 2000, the Department formally accepted two new Board recommendations and developed implementation plans in response to those recommendations. The Department also made significant progress with a number of broad-based safety initiatives. These include initial implementation of integrated safety management at field sites and within headquartersmore » program offices, issuance of a nuclear safety rule, and continued progress on stabilizing excess nuclear materials to achieve significant risk reduction.« less

  14. Management of hidradenitis suppurativa wounds with an internal vacuum-assisted closure device.

    PubMed

    Chen, Y Erin; Gerstle, Theodore; Verma, Kapil; Treiser, Matthew D; Kimball, Alexandra B; Orgill, Dennis P

    2014-03-01

    Hidradenitis suppurativa is a chronic, debilitating disease that is difficult to treat. Once medical management fails, wide local excision offers the best chance for cure. However, the resultant wound often proves too large or contaminated for immediate closure. The authors performed a retrospective chart review of hidradenitis cases managed surgically between 2005 and 2010. Data collected included patient characteristics, management method, and outcomes. Approximately half of the patients received internal vacuum-assisted closure therapy using the vacuum-assisted closure system and delayed closure and half of the patients received immediate primary closure at the time of their excision. Delayed closure consisted of closing the majority of the wound in a linear fashion following internal vacuum-assisted closure while accepting healing by means of secondary intention for small wound areas. Patients managed with internal vacuum-assisted closure had wounds on average four times larger in area than patients managed without internal vacuum-assisted closure. In both groups, all wounds were eventually closed primarily. Healing times averaged 2.2 months with internal vacuum-assisted closure and 2.7 months without. At an average follow-up time of 2.3 months, all patients with internal vacuum-assisted closure had no recurrence of their local disease. Severe hidradenitis presents a treatment challenge, as surgical excisions are often complicated by difficult closures and unsatisfactory recurrence rates. This study demonstrates that wide local excision with reasonable outcomes can be achieved using accelerated delayed primary closure. This method uses internal vacuum-assisted closure as a bridge between excision and delayed primary closure, facilitating closure without recurrence in large, heavily contaminated wounds. Therapeutic, III.

  15. Dual therapeutic functions of F-5 fragment in burn wounds: preventing wound progression and promoting wound healing in pigs

    PubMed Central

    Bhatia, Ayesha; O’Brien, Kathryn; Chen, Mei; Wong, Alex; Garner, Warren; Woodley, David T.; Li, Wei

    2016-01-01

    Burn injuries are a leading cause of morbidity including prolonged hospitalization, disfigurement, and disability. Currently there is no Food and Drug Administration-approved burn therapeutics. A clinical distinction of burn injuries from other acute wounds is the event of the so-called secondary burn wound progression within the first week of the injury, in which a burn expands horizontally and vertically from its initial boundary to a larger area. Therefore, an effective therapeutics for burns should show dual abilities to prevent the burn wound progression and thereafter promote burn wound healing. Herein we report that topically applied F-5 fragment of heat shock protein-90α is a dual functional agent to promote burn wound healing in pigs. First, F-5 prevents burn wound progression by protecting the surrounding cells from undergoing heat-induced caspase 3 activation and apoptosis with increased Akt activation. Accordingly, F-5–treated burn and excision wounds show a marked decline in inflammation. Thereafter, F-5 accelerates burn wound healing by stimulating the keratinocyte migration-led reepithelialization, leading to wound closure. This study addresses a topical agent that is capable of preventing burn wound progression and accelerating burn wound healing. PMID:27382602

  16. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  17. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  18. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  19. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  20. 49 CFR 172.331 - Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Bulk packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. 172.331 Section 172.331 Transportation Other Regulations... packagings other than portable tanks, cargo tanks, tank cars and multi-unit tank car tanks. (a) Each person...

  1. The Summer of Hydrogen

    NASA Technical Reports Server (NTRS)

    Weber, Philip

    2008-01-01

    Ground crew veterans at Kennedy Space Center still talk about what they call "the summer of hydrogen"-the long, frustrating months in 1990 when the shuttle fleet was grounded by an elusive hydrogen leak that foiled our efforts to fill the orbiter's external fuel tank. Columbia (STS-35) was on Launch Pad A for a scheduled May 30 launch when we discovered the hydrogen leak during - tanking. The external fuel tank is loaded through the orbiter. Liquid hydrogen flows through a 17-inch umbilical between the orbiter and the tank. During fueling, we purge the aft fuselage with gaseous nitrogen to reduce the risk of fire, and we have a leak-detection system in the mobile launch platform, which samples (via tygon tubing) the atmosphere in and around the vehicle, drawing it down to a mass spectrometer that analyzes its composition. When we progressed to the stage of tanking where liquid hydrogen flows through the vehicle, the concentration of hydrogen approached four percent-the limit above which it would be dangerously flammable. We had a leak. We did everything we could think of to find it, and the contractor who supplied the flight hardware was there every day, working alongside us. We did tanking tests, which involved instrumenting the suspected leak sources, and cryo-loaded the external tank to try to isolate precisely where the leak originated. We switched out umbilicals; we replaced the seals between the umbilical and the orbiter. We inspected the seals microscopically and found no flaws. We replaced the recirculation pumps, and we found and replaced a damaged teflon seal in a main propulsion system detent cover, which holds the prevalve-the main valve supplying hydrogen to Space Shuttle Main Engine 3 -in the open position. The seal passed leak tests at ambient temperature but leaked when cryogenic temperatures were applied. We added new leak sensors-up to twenty at a time and tried to be methodical in our placements to narrow down the possible sources of the problem. We even switched orbiters, sending Columbia back to the Vehicle Assembly Building and bringing out Atlantis, scheduled to fly as STS-38. Two shuttles on their mobile launchers passing in the night was a majestic sight, but not one you want to see if you're trying to get an orbiter launched. None of this told us where the leak was, or if we were dealing with more than one leak source.

  2. A Pine Is a Pine and a Spruce Is a Spruce--The Effect of Tree Species and Stand Age on Epiphytic Lichen Communities.

    PubMed

    Bäcklund, Sofia; Jönsson, Mari; Strengbom, Joachim; Frisch, Andreas; Thor, Göran

    2016-01-01

    With an increasing demand for forest-based products, there is a growing interest in introducing fast-growing non-native tree species in forest management. Such introductions often have unknown consequences for native forest biodiversity. In this study, we examine epiphytic lichen species richness and species composition on the trunks of non-native Pinus contorta and compare these to the native Pinus sylvestris and Picea abies in managed boreal forests in northern Sweden across a chronosequence of age classes. Overall, we recorded a total of 66,209 lichen occurrences belonging to 57 species in the 96 studied forest stands. We found no difference in species richness of lichens between stands of P. contorta and P. sylvestris, but stands of P. abies had higher total species richness. However, species richness of lichens in stands of P. abies decreased with increasing stand age, while no such age effect was detected for P. contorta and P. sylvestris. Lichen species composition progressively diverged with increasing stand age, and in 30-year-old stands all three tree species showed species-specific assemblages. Epiphytic lichen assemblages in stands of 30-year-old P. contorta were influenced by greater basal area, canopy closure, and average diameter at breast height, P. abies stands by higher branch density and canopy closure, and stands of P. sylvestris by greater bark crevice depth. Differences in lichen species richness and composition were mainly explained by canopy closure and habitat availability, and the greater canopy closure in mature P. abies stands promoted the colonization and growth of calicioid lichen species. Our results indicate that the non-native P. contorta have similar species richness as the native P. sylvestris. The main difference in lichen species richness and composition is between P. abies and Pinus spp. in managed forests of boreal Sweden.

  3. A Pine Is a Pine and a Spruce Is a Spruce – The Effect of Tree Species and Stand Age on Epiphytic Lichen Communities

    PubMed Central

    Bäcklund, Sofia; Jönsson, Mari; Strengbom, Joachim; Frisch, Andreas; Thor, Göran

    2016-01-01

    With an increasing demand for forest-based products, there is a growing interest in introducing fast-growing non-native tree species in forest management. Such introductions often have unknown consequences for native forest biodiversity. In this study, we examine epiphytic lichen species richness and species composition on the trunks of non-native Pinus contorta and compare these to the native Pinus sylvestris and Picea abies in managed boreal forests in northern Sweden across a chronosequence of age classes. Overall, we recorded a total of 66,209 lichen occurrences belonging to 57 species in the 96 studied forest stands. We found no difference in species richness of lichens between stands of P. contorta and P. sylvestris, but stands of P. abies had higher total species richness. However, species richness of lichens in stands of P. abies decreased with increasing stand age, while no such age effect was detected for P. contorta and P. sylvestris. Lichen species composition progressively diverged with increasing stand age, and in 30-year-old stands all three tree species showed species-specific assemblages. Epiphytic lichen assemblages in stands of 30-year-old P. contorta were influenced by greater basal area, canopy closure, and average diameter at breast height, P. abies stands by higher branch density and canopy closure, and stands of P. sylvestris by greater bark crevice depth. Differences in lichen species richness and composition were mainly explained by canopy closure and habitat availability, and the greater canopy closure in mature P. abies stands promoted the colonization and growth of calicioid lichen species. Our results indicate that the non-native P. contorta have similar species richness as the native P. sylvestris. The main difference in lichen species richness and composition is between P. abies and Pinus spp. in managed forests of boreal Sweden. PMID:26799558

  4. Water based on a molecular model behaves like a hard-sphere solvent for a nonpolar solute when the reference interaction site model and related theories are employed

    NASA Astrophysics Data System (ADS)

    Hayashi, Tomohiko; Oshima, Hiraku; Harano, Yuichi; Kinoshita, Masahiro

    2016-09-01

    For neutral hard-sphere solutes, we compare the reduced density profile of water around a solute g(r), solvation free energy μ, energy U, and entropy S under the isochoric condition predicted by the two theories: dielectrically consistent reference interaction site model (DRISM) and angle-dependent integral equation (ADIE) theories. A molecular model for water pertinent to each theory is adopted. The hypernetted-chain (HNC) closure is employed in the ADIE theory, and the HNC and Kovalenko-Hirata (K-H) closures are tested in the DRISM theory. We also calculate g(r), U, S, and μ of the same solute in a hard-sphere solvent whose molecular diameter and number density are set at those of water, in which case the radial-symmetric integral equation (RSIE) theory is employed. The dependences of μ, U, and S on the excluded volume and solvent-accessible surface area are analyzed using the morphometric approach (MA). The results from the ADIE theory are in by far better agreement with those from computer simulations available for g(r), U, and μ. For the DRISM theory, g(r) in the vicinity of the solute is quite high and becomes progressively higher as the solute diameter d U increases. By contrast, for the ADIE theory, it is much lower and becomes further lower as d U increases. Due to unphysically positive U and significantly larger |S|, μ from the DRISM theory becomes too high. It is interesting that μ, U, and S from the K-H closure are worse than those from the HNC closure. Overall, the results from the DRISM theory with a molecular model for water are quite similar to those from the RSIE theory with the hard-sphere solvent. Based on the results of the MA analysis, we comparatively discuss the different theoretical methods for cases where they are applied to studies on the solvation of a protein.

  5. Adaptive harvest management for the Svalbard population of Pink-Footed Geese: 2014 progress summary

    USGS Publications Warehouse

    Johnson, Fred A.; Madsen, J.

    2015-01-01

    During the summer of 2013 we computed an optimal harvest strategy for the 3-year period 2013 – 2015. The strategy suggested that the appropriate annual harvest quota is 15 thousand. The 1-year harvest strategy calculated to determine whether an emergency closure of the hunting season is required this year suggested an allowable harvest of 25.0 thousand; thus, a hunting-season closure is not warranted.  If the harvest quota of 15 thousand were met in the coming hunting season, the next population count would be expected to be 71.0 thousand.  If only the most recent 4-year mean harvest were realized (11.3 thousand), a population size of 74.8 thousand would be expected.  Simulations suggest that it will take approximately seven years at current harvest levels to reduce population size to the goal of 60 thousand.  However, it is possible that the extension of the forthcoming hunting season in Denmark could result in a total harvest approaching 15 thousand; in this case, simulations suggest it would only take about three years to reach the goal.

  6. Environmental regulatory failure and metal contamination at the Giap Lai pyrite mine, Northern Vietnam.

    PubMed

    Håkan Tarras-Wahlberg, N; Nguyen, Lan T

    2008-03-01

    The causes for the failure in enforcement of environmental regulations at the Giap Lai pyrite mine in northern Vietnam are considered and the environmental impacts that are associated with this mine are evaluated. It is shown that sulphide-rich tailings and waste rock in the mining area represent significant sources of acid rock drainage (ARD). The ARD is causing elevated metal levels in downstream water bodies, which in turn, represent a threat to both human health and to aquatic ecosystems. Metal concentrations in impacted surface waters have increased after mine closure, suggesting that impacts are becoming progressively more serious. No post-closure, remediation measures have been applied at the mine, in spite of the existence of environmental legislation and both central and regional institutions charged with environmental supervision and control. The research presented here provides further emphasis for the recommendation that, while government institutions may need to be strengthened, and environmental regulations need to be in place, true on the ground improvement in environmental quality in Vietnam and in many other developing countries require an increased focus on promoting public awareness of industrial environmental issues.

  7. Flame-conditioned turbulence modeling for reacting flows

    NASA Astrophysics Data System (ADS)

    Macart, Jonathan F.; Mueller, Michael E.

    2017-11-01

    Conventional approaches to turbulence modeling in reacting flows rely on unconditional averaging or filtering, that is, consideration of the momentum equations only in physical space, implicitly assuming that the flame only weakly affects the turbulence, aside from a variation in density. Conversely, for scalars, which are strongly coupled to the flame structure, their evolution equations are often projected onto a reduced-order manifold, that is, conditionally averaged or filtered, on a flame variable such as a mixture fraction or progress variable. Such approaches include Conditional Moment Closure (CMC) and related variants. However, recent observations from Direct Numerical Simulation (DNS) have indicated that the flame can strongly affect turbulence in premixed combustion at low Karlovitz number. In this work, a new approach to turbulence modeling for reacting flows is investigated in which conditionally averaged or filtered equations are evolved for the momentum. The conditionally-averaged equations for the velocity and its covariances are derived, and budgets are evaluated from DNS databases of turbulent premixed planar jet flames. The most important terms in these equations are identified, and preliminary closure models are proposed.

  8. Modeling Fatigue Damage Onset and Progression in Composites Using an Element-Based Virtual Crack Closure Technique Combined With the Floating Node Method

    NASA Technical Reports Server (NTRS)

    De Carvalho, Nelson V.; Krueger, Ronald

    2016-01-01

    A new methodology is proposed to model the onset and propagation of matrix cracks and delaminations in carbon-epoxy composites subject to fatigue loading. An extended interface element, based on the Floating Node Method, is developed to represent delaminations and matrix cracks explicitly in a mesh independent fashion. Crack propagation is determined using an element-based Virtual Crack Closure Technique approach to determine mixed-mode energy release rates, and the Paris-Law relationship to obtain crack growth rate. Crack onset is determined using a stressbased onset criterion coupled with a stress vs. cycle curve and Palmgren-Miner rule to account for fatigue damage accumulation. The approach is implemented in Abaqus/Standard® via the user subroutine functionality. Verification exercises are performed to assess the accuracy and correct implementation of the approach. Finally, it was demonstrated that this approach captured the differences in failure morphology in fatigue for two laminates of identical stiffness, but with layups containing ?deg plies that were either stacked in a single group, or distributed through the laminate thickness.

  9. Massing the Third Dimension in AirLand Battle-Future: The Aviation Division

    DTIC Science & Technology

    1990-12-01

    org.anizzationai prececients wnicn nave aireaay oeen successtuiiy tieioea or are aoour to De as in the case of the German A irmooile 6ivision in German "Army...progression to autonomous aviation units performing the tank and transport role simuitanfousIv. TUKHACHE VSKY Constoereo by some as the father or the deep...A comotnea arms torce consisting mainly or MBAVs as the major kLiilng system, wouja be, in von Senger uno Etteriin s view, a tacticaliy and logistica

  10. A theoretical/experimental program to develop active optical pollution sensors, part 2

    NASA Technical Reports Server (NTRS)

    Poultney, S. K.

    1975-01-01

    Progress is reported on experimental investigations of Lidar and the application of Lidar to environmental and atmospheric science. Specifically the following programs are considered: calibration and application of the LaRC 48-inch Lidar; efficient and certain detection of SO2 and other gases in the calibration tank using the Raman Stack Monitor Lidar; the potential of Lidar remote sensing from the space shuttle; and the planning and mounting of efforts to realize the promise of backscatter differential absorption Lidar.

  11. Prediction of Ship Roll Damping. A State of the Art

    DTIC Science & Technology

    1981-09-01

    Armin W. Troesch and Mr. John P. Hackett for their valuable advice, discussions and encouragement. The author also feels grateful to Professor Norio...Hadd- . (60], and Lewison [61] have proposed expressing the roll damping in a cubi orm without quadratic term, B 1 +B 3 0 , for con- venience in the...34 Internat. Shipbuildin; Progress, Vo.l. 20 (1973). 61. Lewison , G.R.G.: "Optimum Design of Passive Roll Stabilizer Tanks," The Naval Architect (1976). Ij t

  12. Microscale Enhancement of Heat and Mass Transfer for Hydrogen Energy Storage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drost, Kevin; Jovanovic, Goran; Paul, Brian

    2015-09-30

    The document summarized the technical progress associated with OSU’s involvement in the Hydrogen Storage Engineering Center of Excellence. OSU focused on the development of microscale enhancement technologies for improving heat and mass transfer in automotive hydrogen storage systems. OSU’s key contributions included the development of an extremely compact microchannel combustion system for discharging hydrogen storage systems and a thermal management system for adsorption based hydrogen storage using microchannel cooling (the Modular Adsorption Tank Insert or MATI).

  13. Unibody Composite Pressurized Structure

    NASA Technical Reports Server (NTRS)

    Rufer, Markus; Conger, Robert; Bauer, Thomas; Newman, John

    2013-01-01

    An integrated, generic unibody composite pressurized structure (UCPS) combined with a positive expulsion device (PED), consisting of an elastomeric bladder for monopropellant hydrazine, has been quasi-standardized for spacecraft use. The combination functions as an all-composite, non-metallic, propellant tank with bladder. The integrated UCPS combines several previous innovations - specifically, the linerless, all-composite cryogenic tank technology; all-composite boss; resin formulation; and integrated stringer system. The innovation combines the UCPS with an integrated propellant management device (PMD), the PED or bladder, to create an entirely unique system for in-space use. The UCPS is a pressure vessel that incorporates skirts, stringers, and other structures so that it is both an in-space hydrazine tank, and also a structural support system for a spacecraft in a single, all-composite unit. This innovation builds on the progress in the development of a previous SBIR (Small Business Innovation Research) Phase I with Glenn Research Center and an SBIR III with Johnson Space Center that included the fabrication of two 42-in. (˜107-cm) diameter all-composite cryogenic (LOX and liquid methane) UCPS test tanks for a lunar lander. This Phase II provides hydra zine compatibility testing of the elastomeric bladder, a see-through PED to validate the expulsion process and model, and a complete UCPS-based PED with stringers and skirts that will be used to conduct initial qualification and expulsion tests. This extends the UCPS technology to include hydrazine-based, in-space pro - pulsion applications and can also be used for electric propulsion. This innovation creates a system that, in comparison to the traditional approach, is lower in weight, cost, volume, and production time; is stronger; and is capable of much higher pressures. It also has fewer failure modes, and is applicable to both chemical and electric propulsion systems.

  14. Natural orifice transluminal endoscopic surgery gastrotomy closure with an over-the-endoscope clip: a randomized, controlled porcine study (with videos).

    PubMed

    von Renteln, Daniel; Schmidt, Arthur; Vassiliou, Melina C; Gieselmann, Maria; Caca, Karel

    2009-10-01

    Secure endoscopic closure of transgastric natural orifice transluminal endoscopic surgery (NOTES) access is of paramount importance. The over-the-scope clip (OTSC) system has previously been shown to be effective for NOTES gastrotomy closure. To compare OTSC gastrotomy closure with surgical closure. Randomized, controlled animal study. Animal facility laboratory. Thirty-six female domestic pigs. Gastrotomies were created by using a needle-knife and an 18-mm balloon. The animals were subsequently randomized to either open surgical repair with interrupted sutures or endoscopic repair with 12-mm OTSCs. In addition, pressurized leak tests were performed in ex vivo specimens of 18-mm scalpel incisions closed with suture (n = 14) and of intact stomachs (n = 10). The mean time for endoscopic closure was 9.8 minutes (range 3-22, SD 5.5). No complications occurred during either type of gastrotomy closure. At necropsy, examination of all OTSC and surgical closures demonstrated complete sealing of gastrotomy sites without evidence of injury to adjacent organs. Pressurized leak tests showed a mean burst pressure of 83 mm Hg (range 30-140, SD 27) for OTSC closures and 67 mm Hg (range 30-130, SD 27.7) for surgical sutures. Ex vivo hand-sewn sutures of 18-mm gastrotomies (n = 14) exhibited a mean burst pressure of 65 mm Hg (range 20-140, SD 31) and intact ex vivo stomachs (n = 10) had a mean burst pressure of 126 mm Hg (range 90-170, SD 28). The burst pressure of ex vivo intact stomachs was significantly higher compared with OTSC closures (P < .01), in vivo surgical closures (P < .01), and ex vivo hand-sewn closures (P < .01). There was a trend toward higher burst pressures in the OTSC closures compared with surgical closures (P = .063) and ex vivo hand-sewn closures (P = .094). In vivo surgical closures demonstrated similar burst pressures compared with ex vivo hand-sewn closures (P = .848). Nonsurvival setting. Endoscopic closure by using the OTSC system is comparable to surgical closure in a nonsurvival porcine model. This technique is easy to perform and is suitable for NOTES gastrotomy closure.

  15. Evaluation of the Momentum Closure Schemes in MPAS-Ocean

    NASA Astrophysics Data System (ADS)

    Zhao, Shimei; Liu, Yudi; Liu, Wei

    2018-04-01

    In order to compare and evaluate the performances of the Laplacian viscosity closure, the biharmonic viscosity closure, and the Leith closure momentum schemes in the MPAS-Ocean model, a variety of physical quantities, such as the relative reference potential energy (RPE) change, the RPE time change rate (RPETCR), the grid Reynolds number, the root mean square (RMS) of kinetic energy, and the spectra of kinetic energy and enstrophy, are calculated on the basis of results of a 3D baroclinic periodic channel. Results indicate that: 1) The RPETCR demonstrates a saturation phenomenon in baroclinic eddy tests. The critical grid Reynolds number corresponding to RPETCR saturation differs between the three closures: the largest value is in the biharmonic viscosity closure, followed by that in the Laplacian viscosity closure, and that in the Leith closure is the smallest. 2) All three closures can effectively suppress spurious dianeutral mixing by reducing the grid Reynolds number under sub-saturation conditions of the RPETCR, but they can also damage certain physical processes. Generally, the damage to the rotation process is greater than that to the advection process. 3) The dissipation in the biharmonic viscosity closure is strongly dependent on scales. Most dissipation concentrates on small scales, and the energy of small-scale eddies is often transferred to large-scale kinetic energy. The viscous dissipation in the Laplacian viscosity closure is the strongest on various scales, followed by that in the Leith closure. Note that part of the small-scale kinetic energy is also transferred to large-scale kinetic energy in the Leith closure. 4) The characteristic length scale L and the dimensionless parameter D in the Leith closure are inherently coupled. The RPETCR is inversely proportional to the product of D and L. When the product of D and L is constant, both the simulated RPETCR and the inhibition of spurious dianeutral mixing are the same in all tests using the Leith closure. The dissipative scale in the Leith closure depends on the parameter L, and the dissipative intensity depends on the parameter D. 5) Although optimal results may not be achieved by using the optimal parameters obtained from the 2D barotropic model in the 3D baroclinic simulation, the total energies are dissipative in all three closures. Dissipation is the strongest in the biharmonic viscosity closure, followed by that in the Leith closure, and that in the Laplacian viscosity closure is the weakest. Mesoscale eddies develop the fastest in the biharmonic viscosity closure after the baroclinic adjustment process finishes, and the kinetic energy reaches its maximum, which is attributed to the smallest dissipation of enstrophy in the biharmonic viscosity closure. Mesoscale eddies develop the slowest, and the kinetic energy peak value is the smallest in the Laplacian viscosity closure. Results in the Leith closure are between that in the biharmonic viscosity closure and the Laplacian viscosity closure.

  16. 40 CFR 264.151 - Wording of the instruments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... CFR parts 264 and 265. The current closure and/or post-closure cost estimate covered by the test are...

  17. 40 CFR 264.151 - Wording of the instruments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... CFR parts 264 and 265. The current closure and/or post-closure cost estimate covered by the test are...

  18. 40 CFR 264.151 - Wording of the instruments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... CFR parts 264 and 265. The current closure and/or post-closure cost estimate covered by the test are...

  19. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  20. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  1. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  2. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  3. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  4. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  5. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  6. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  7. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  8. 49 CFR 174.63 - Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car tanks. 174.63 Section 174.63 Transportation Other....63 Portable tanks, IM portable tanks, IBCs, Large Packagings, cargo tanks, and multi-unit tank car...

  9. Computational investigations and grid refinement study of 3D transient flow in a cylindrical tank using OpenFOAM

    NASA Astrophysics Data System (ADS)

    Mohd Sakri, F.; Mat Ali, M. S.; Sheikh Salim, S. A. Z.

    2016-10-01

    The study of physic fluid for a liquid draining inside a tank is easily accessible using numerical simulation. However, numerical simulation is expensive when the liquid draining involves the multi-phase problem. Since an accurate numerical simulation can be obtained if a proper method for error estimation is accomplished, this paper provides systematic assessment of error estimation due to grid convergence error using OpenFOAM. OpenFOAM is an open source CFD-toolbox and it is well-known among the researchers and institutions because of its free applications and ready to use. In this study, three types of grid resolution are used: coarse, medium and fine grids. Grid Convergence Index (GCI) is applied to estimate the error due to the grid sensitivity. A monotonic convergence condition is obtained in this study that shows the grid convergence error has been progressively reduced. The fine grid has the GCI value below 1%. The extrapolated value from Richardson Extrapolation is in the range of the GCI obtained.

  10. The challenge of emergency response dispersion models on the meso-gamma urban scale: A case study of the July 26, 1993 Oleum tank car spill in Richmond, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baskett, R.L.; Vogt, P.J.; Schalk, W.W.

    This paper presents a recent case study that illustrates the difficulty of modeling accidental toxic releases in urban area. On the morning of July 26, 1993, oleum was accidentally released from a railroad tank car in Richmond, California. State and local agencies requested real-time modeling from the Atmospheric Release Advisory Capability (ARAC) at Lawrence Livermore National Laboratory (LLNL). Although the ARAC`s with the US Department of Energy is for nuclear materials, the team responded to the accident under an Agreement in Principle with the State of California. ARAC provided model plots describing the location and progress of the toxic cloudmore » to the agencies managing the response. The primary protective action for the public was to shelter in place. Highways, rail lines and public transportation were blocked. The incident was significant, enough that over 24,000 people sought medical attention within the week following the release.« less

  11. Regulatory Concerns on the In-Containment Water Storage System of the Korean Next Generation Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ahn, Hyung-Joon; Lee, Jae-Hun; Bang, Young-Seok

    2002-07-15

    The in-containment water storage system (IWSS) is a newly adopted system in the design of the Korean Next Generation Reactor (KNGR). It consists of the in-containment refueling water storage tank, holdup volume tank, and cavity flooding system (CFS). The IWSS has the function of steam condensation and heat sink for the steam release from the pressurizer and provides cooling water to the safety injection system and containment spray system in an accident condition and to the CFS in a severe accident condition. With the progress of the KNGR design, the Korea Institute of Nuclear Safety has been developing Safety andmore » Regulatory Requirements and Guidances for safety review of the KNGR. In this paper, regarding the IWSS of the KNGR, the major contents of the General Safety Criteria, Specific Safety Requirements, Safety Regulatory Guides, and Safety Review Procedures were introduced, and the safety review items that have to be reviewed in-depth from the regulatory viewpoint were also identified.« less

  12. Tank binding kinase 1 is a centrosome-associated kinase necessary for microtubule dynamics and mitosis

    PubMed Central

    Pillai, Smitha; Nguyen, Jonathan; Johnson, Joseph; Haura, Eric; Coppola, Domenico; Chellappan, Srikumar

    2015-01-01

    TANK Binding Kinase 1 (TBK1) is a non-canonical IκB kinase that contributes to KRAS-driven lung cancer. Here we report that TBK1 plays essential roles in mammalian cell division. Specifically, levels of active phospho-TBK1 increase during mitosis and localize to centrosomes, mitotic spindles and midbody, and selective inhibition or silencing of TBK1 triggers defects in spindle assembly and prevents mitotic progression. TBK1 binds to the centrosomal protein CEP170 and to the mitotic apparatus protein NuMA, and both CEP170 and NuMA are TBK1 substrates. Further, TBK1 is necessary for CEP170 centrosomal localization and binding to the microtubule depolymerase Kif2b, and for NuMA binding to dynein. Finally, selective disruption of the TBK1–CEP170 complex augments microtubule stability and triggers defects in mitosis, suggesting that TBK1 functions as a mitotic kinase necessary for microtubule dynamics and mitosis. PMID:26656453

  13. Automated culture of aquatic model organisms: shrimp larvae husbandry for the needs of research and aquaculture.

    PubMed

    Mutalipassi, M; Di Natale, M; Mazzella, V; Zupo, V

    2018-01-01

    Modern research makes frequent use of animal models, that is, organisms raised and bred experimentally in order to help the understanding of biological and chemical processes affecting organisms or whole environments. The development of flexible, reprogrammable and modular systems that may help the automatic production of 'not-easy-to-keep' species is important for scientific purposes and for such aquaculture needs as the production of alive foods, the culture of small larvae and the test of new culture procedures. For this reason, we planned and built a programmable experimental system adaptable to the culture of various aquatic organisms, at different developmental stages. The system is based on culture cylinders contained into operational tanks connected to water conditioning tanks. A programmable central processor unit controls the operations, that is, water changes, temperature, light irradiance, the opening and closure of valves for the discharge of unused foods, water circulation and filtration and disinfection systems, according to the information received by various probes. Various devices may be set to modify water circulation and water changes to fulfil the needs of given organisms, to avoid damage of delicate structures, improve feeding performances and reduce the risk of movements over the water surface. The results obtained indicate that the system is effective in the production of shrimp larvae, being able to produce Hippolyte inermis post-larvae with low mortality as compared with the standard operation procedures followed by human operators. Therefore, the patented prototype described in the present study is a possible solution to automate and simplify the rearing of small invertebrates in the laboratory and in production plants.

  14. Cultivation of macroscopic marine algae and freshwater aquatic needs. Progress report, May 1, 1979-December 15, 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryther, J H

    1980-01-01

    Progress for the period May 1979 to December 1979 is reported in the following subject areas: (1) the ORCA clone of the red seaweed Gracilaria tikvakiae has now been grown continuously in tank culture for two years; (2) studies were continued on the culture of freshwater plants such as water hyacinth, pennywort, water lettuce, and duckweed; (3) the loss of water from evapotranspiration of freshwater plants was measured and compared with water loss from evaporation from open water; and (4) experiments were conducted to investigate the possibility of recycling the chemicals left in the solid and liquid residues following anaerobicmore » digestion and methane production as a source of nutrients for new plant production. (ACR)« less

  15. 40 CFR 261.151 - Wording of the instruments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... financial test specified in subpart H of 40 CFR parts 264 and 265. The current closure and/or post-closure...

  16. 50 CFR 660.360 - Recreational fishery-management measures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... authorized for recreational fishing are hook-and-line and spear. Spears may be propelled by hand or by... when the closure is in effect. The closure is not in effect at this time. This closure may be imposed... when the closure is in effect. The closure is not in effect at this time. This closure may be imposed...

  17. 50 CFR 660.360 - Recreational fishery-management measures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... authorized for recreational fishing are hook-and-line and spear. Spears may be propelled by hand or by... when the closure is in effect. The closure is not in effect at this time. This closure may be imposed... when the closure is in effect. The closure is not in effect at this time. This closure may be imposed...

  18. An unusual occupational accident: fall into a sewage plant tank with lethal outcome.

    PubMed

    Padosch, Stephan A; Dettmeyer, Reinhard B; Kröner, Lars U; Preuss, Johanna; Madea, Burkhard

    2005-04-20

    Occupational accidents, often presenting with lethal outcomes, are a rarely reported issue in forensic literature. However, these incidents are part of medicolegal casework with special regard to reconstruction, liabilities and insurance law-related issues, respectively. We report on a lethal occupational accident in a metropolitan sewage plant. When performing routine controls, a technician fell into an overflow sewer and was immediately pulled into a 30 cm diameter drain. Rescue efforts were initiated immediately, but had to be terminated due to gas warning. Rescue teams continued the search, however, the body remained undiscoverable. Forty-eight hours later, the cadaver was found in an adjacent digester tank, from where it was finally rescued. It was concluded, that the body had been transported between the overflow sewer and the digester tank through a 120 m pipeline with several 90 degrees bendings and branch connections with a minimum diameter of 25 cm at the discharge valve. On medicolegal examination, the cadaver showed marked signs of advanced decomposition caused by anaerobic microorganisms in the 37 degrees C biomass environment. Moreover, as a consequence of the passage of the pipeline system, signs of massive trauma (several comminuted and compound fractures) were disclosed at autopsy. To us, this is the first report on a lethal occupational accident in a sewage plant; our observations demonstrate the rapid progress of putrefaction in a warm anaerobic bacterial environment and the massive trauma sustained.

  19. Enhancing capacity for risk factor surveillance at the regional/local level: a follow-up review of the findings of the Canadian Think Tank Forum after 4 years

    PubMed Central

    2014-01-01

    Background National health surveys are sometimes used to provide estimates on risk factors for policy and program development at the regional/local level. However, as regional/local needs may differ from national ones, an important question is how to also enhance capacity for risk factor surveillance regionally/locally. Methods A Think Tank Forum was convened in Canada to discuss the needs, characteristics, coordination, tools and next steps to build capacity for regional/local risk factor surveillance. A series of follow up activities to review the relevant issues pertaining to needs, characteristics and capacity of risk factor surveillance were conducted. Results Results confirmed the need for a regional/local risk factor surveillance system that is flexible, timely, of good quality, having a communication plan, and responsive to local needs. It is important to conduct an environmental scan and a gap analysis, to develop a common vision, to build central and local coordination and leadership, to build on existing tools and resources, and to use innovation. Conclusions Findings of the Think Tank Forum are important for building surveillance capacity at the local/county level, both in Canada and globally. This paper provides a follow-up review of the findings based on progress over the last 4 years. PMID:24451555

  20. Evaluation of Container Closure System Integrity for Frozen Storage Drug Products.

    PubMed

    Nieto, Alejandra; Roehl, Holger; Brown, Helen; Nikoloff, Jonas; Adler, Michael; Mahler, Hanns-Christian

    2016-01-01

    Sometimes, drug product for parenteral administration is stored in a frozen state (e.g., -20 °C or -80 °C), particularly during early stages of development of some biotech molecules in order to provide sufficient stability. Shipment of frozen product could potentially be performed in the frozen state, yet possibly at different temperatures, for example, using dry ice (-80 °C). Container closure systems of drug products usually consist of a glass vial, rubber stopper, and an aluminum crimped cap. In the frozen state, the glass transition temperature (Tg) of commonly used rubber stoppers is between -55 and -65 °C. Below their Tg, rubber stoppers are known to lose their elastic properties and become brittle, and thus potentially fail to maintain container closure integrity in the frozen state. Leaks during frozen temperature storage and transportation are likely to be transient, yet, can possibly risk container closure integrity and lead to microbial contamination. After thawing, the rubber stopper is supposed to re-seal the container closure system. Given the transient nature of the possible impact on container closure integrity in the frozen state, typical container closure integrity testing methods (used at room temperature conditions) are unable to evaluate and thus confirm container closure integrity in the frozen state. Here we present the development of a novel method (thermal physical container closure integrity) for direct assessment of container closure integrity by a physical method (physical container closure integrity) at frozen conditions, using a modified He leakage test. In this study, different container closure systems were evaluated with regard to physical container closure integrity in the frozen state to assess the suitability of vial/stopper combinations and were compared to a gas headspace method. In summary, the thermal physical container closure integrity He leakage method was more sensitive in detecting physical container closure integrity impact than gas headspace and aided identification of an unsuitable container closure system. Sometimes, drug product for parenteral administration is stored in a frozen state (e.g., -20 °C or -80 °C), particularly during early stages of development of some biotech molecules in order to provide sufficient stability. Container closure systems for drug products usually consist of a glass vial, rubber stopper, and an aluminum crimped cap. In the frozen state, the glass transition temperature (Tg) of commonly used rubber stoppers is between -55 and -65 °C. Leaks during frozen temperature storage and transportation are likely to be transient, yet they can possibly risk container closure integrity and lead to microbial contamination and sterility breach. After thawing, the rubber stopper is expected to re-seal the container closure system. Given the transient nature of the possible impact on container closure integrity in the frozen state, typical container closure integrity testing methods (used at room temperature conditions) are unable to evaluate and thus confirm container closure integrity in the frozen state. Here we present the development of a novel method (thermal container closure integrity) for direct measurement of container closure integrity by a physical method (physical container closure integrity) at frozen conditions, using a modified He leakage test. In this study, we found that the thermal container closure integrity He leakage method was more sensitive in detecting physical container closure integrity impact than gas headspace and aided identification of an unsuitable container closure system. © PDA, Inc. 2016.

  1. Resource Conservation and Recovery Act closure report: Area 2 Bitcutter and Postshot Containment Shops Injection Wells, Correction Action Unit 90

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less

  2. Linearly exact parallel closures for slab geometry

    NASA Astrophysics Data System (ADS)

    Ji, Jeong-Young; Held, Eric D.; Jhang, Hogun

    2013-08-01

    Parallel closures are obtained by solving a linearized kinetic equation with a model collision operator using the Fourier transform method. The closures expressed in wave number space are exact for time-dependent linear problems to within the limits of the model collision operator. In the adiabatic, collisionless limit, an inverse Fourier transform is performed to obtain integral (nonlocal) parallel closures in real space; parallel heat flow and viscosity closures for density, temperature, and flow velocity equations replace Braginskii's parallel closure relations, and parallel flow velocity and heat flow closures for density and temperature equations replace Spitzer's parallel transport relations. It is verified that the closures reproduce the exact linear response function of Hammett and Perkins [Phys. Rev. Lett. 64, 3019 (1990)] for Landau damping given a temperature gradient. In contrast to their approximate closures where the vanishing viscosity coefficient numerically gives an exact response, our closures relate the heat flow and nonvanishing viscosity to temperature and flow velocity (gradients).

  3. Anterior chamber angle imaging with swept-source optical coherence tomography: measuring peripheral anterior synechia in glaucoma.

    PubMed

    Lai, Isabel; Mak, Heather; Lai, Gilda; Yu, Marco; Lam, Dennis S C; Leung, Christopher K S

    2013-06-01

    To investigate the use of swept-source optical coherence tomography (OCT) for measuring the area and degree of peripheral anterior synechia (PAS) involvement in patients with angle-closure glaucoma. Cross-sectional study. Twenty-three eyes with PAS (detected by indentation gonioscopy) from 20 patients with angle-closure glaucoma (20 eyes had primary angle-closure glaucoma and 3 eyes had angle-closure glaucoma secondary to chronic anterior uveitis [n = 2] and Axenfeld-Rieger syndrome [n = 1]). The anterior chamber angles were evaluated with indentation gonioscopy and imaged by swept-source OCT (Casia OCT, Tomey, Nagoya, Japan) in room light and in the dark using the "angle analysis" protocol, which was composed of 128 radial B-scans each with 512 A-scans (16-mm scan length). The area and degree of PAS involvement were measured in each eye after manual detection of the scleral spur and the anterior irido-angle adhesion by 2 masked observers. The interobserver variability of the PAS measurements was calculated. The agreement of PAS assessment by gonioscopy and OCT, the area and the degree of PAS involvement, and the intraclass correlation coefficient (ICC) of interobserver PAS measurements. The area of PAS (mean ± standard deviation) was 20.8 ± 16.9 mm(2) (range, 3.9-74.9 mm(2)), and the degree of PAS involvement was 186.5 ± 79.9 degrees (range, 42-314 degrees). There was no difference in the area of PAS (P = 0.90) and the degree of PAS involvement (P = 0.95) between images obtained in room light and in the dark. The interobserver ICCs were 0.99 (95% confidence interval [CI], 0.98-1.00) for the area of PAS and 0.99 (95% CI, 0.97-1.00) for the degree of PAS involvement. There was good agreement of PAS assessment between gonioscopy and OCT images (kappa = 0.79; 95% CI, 0.67-0.91). Swept-source OCT allows visualization and reproducible measurements of the area and degree of PAS involvement, providing a new paradigm for evaluation of PAS progression and risk assessment for development of angle-closure glaucoma. The author(s) have no proprietary or commercial interest in any materials discussed in this article. Copyright © 2013 American Academy of Ophthalmology. Published by Elsevier Inc. All rights reserved.

  4. Observations on early and delayed colostomy closure.

    PubMed

    Tade, A O; Salami, B A; Ayoade, B A

    2011-06-01

    Traditional treatment of a variety of colorectal pathologies had included a diverting colostomy that was closed eight or more weeks later during a readmission. The aim of this retrospective study was to determine the outcomes of early colostomy closure and delayed colostomy closure in patients with temporary colostomies following traumatic and non-traumatic colorectal pathologies. In this study early colostomy closure was the closure of a colostomy within three weeks of its construction, while delayed colostomy closure referred to closure after 3 weeks. Complete records of the 37 adult patients who had temporary colostomy constructed and closed between Jan. 1997 December 2003 for various colorectal pathologies were studied. Fourteen patients had early colostomy closure while 23 had delayed closure. In the early colostomy closure group there were 10 men and 4 women. The mean age of the patients was 28yr with a range of 18-65yr. Colostomies were closed 9-18 days after initial colostomy construction. There was no mortality. Morbidity rate 28.6% (4 out of 14). There were two faecal fistulas (14.3%). Twenty-three patients had delayed colostomy closure 8 weeks to 18 months after initial colostomy construction. These were patients unfit for early surgery after initial colostomy construction because of carcinoma, significant weight loss, or sepsis. There was no mortality. Morbidity rate was 26.1%. There were 3 faecal fistulas (13.2%). Outcomes following early colostomy closure and delayed closure were comparable. Patients fit for surgery should have early closure whilst patients who may have compromised health should have delayed closure.

  5. System for closure of a physical anomaly

    DOEpatents

    Bearinger, Jane P; Maitland, Duncan J; Schumann, Daniel L; Wilson, Thomas S

    2014-11-11

    Systems for closure of a physical anomaly. Closure is accomplished by a closure body with an exterior surface. The exterior surface contacts the opening of the anomaly and closes the anomaly. The closure body has a primary shape for closing the anomaly and a secondary shape for being positioned in the physical anomaly. The closure body preferably comprises a shape memory polymer.

  6. Stapler vs suture closure of pancreatic remnant after distal pancreatectomy: a meta-analysis.

    PubMed

    Zhou, Wei; Lv, Ran; Wang, Xianfa; Mou, Yiping; Cai, Xiujun; Herr, Ingrid

    2010-10-01

    Suture closure and stapler closure of the pancreatic remnant after distal pancreatectomy are the techniques used most often. The ideal choice remains a matter of debate. Five bibliographic databases covering 1970 to July 2009 were searched. Sixteen articles met the inclusion criteria. Stapler closure was performed in 671 patients, while suture closure was conducted in 1,615 patients. The pancreatic fistula rate ranged from 0% to 40.0% for stapler closure of the pancreatic stump and from 9.3% to 45.7% for the suture closure technique. There were no significant difference between the stapler and suture closure groups with respect to the pancreatic fistula formation rate (22.1% vs 31.2%; odds ratio, .85; 95% confidence interval, .66-1.08), although there was a trend toward favoring stapler closure. In 4 studies including 437 patients, stapler closure was associated with a trend (not statistically significant) toward a reduction in intra-abdominal abscess (odds ratio, .53; 95% confidence interval, .24-1.15). No significant differences occur between suture and stapler closure with respect to the pancreatic fistula or intra-abdominal abscess after distal pancreatectomy, though there is a trend favoring stapler closure. Copyright © 2010 Elsevier Inc. All rights reserved.

  7. Dual Tank Fuel System

    DOEpatents

    Wagner, Richard William; Burkhard, James Frank; Dauer, Kenneth John

    1999-11-16

    A dual tank fuel system has primary and secondary fuel tanks, with the primary tank including a filler pipe to receive fuel and a discharge line to deliver fuel to an engine, and with a balance pipe interconnecting the primary tank and the secondary tank. The balance pipe opens close to the bottom of each tank to direct fuel from the primary tank to the secondary tank as the primary tank is filled, and to direct fuel from the secondary tank to the primary tank as fuel is discharged from the primary tank through the discharge line. A vent line has branches connected to each tank to direct fuel vapor from the tanks as the tanks are filled, and to admit air to the tanks as fuel is delivered to the engine.

  8. Stump closure of a thick pancreas using stapler closure increases pancreatic fistula after distal pancreatectomy.

    PubMed

    Kawai, Manabu; Tani, Masaji; Okada, Ken-ichi; Hirono, Seiko; Miyazawa, Motoki; Shimizu, Astusi; Kitahata, Yuji; Yamaue, Hiroki

    2013-09-01

    The appropriate surgical stump closure after distal pancreatectomy (DP) is still controversial. This study investigated the benefits and risks of stapler closure during DP. The risk factors of pancreatic fistulas were investigated in 122 DPs among 3 types of stump closure: hand-sewn suture (n = 32), bipolar scissors (n = 45), and stapler closure (n = 45). There was no significant difference in the incidence of pancreatic fistula between the 3 types of stump closure (hand-sewn suture [44%] vs bipolar scissors [37.7%] vs stapler closure [35.5%]). By using receiver operating characteristics curves, 12 mm was the best cutoff value of the thickness of the pancreas for pancreatic fistulas after DP using stapler closure. Three factors (ie, male sex, body mass index >25 kg/m(2), and stapler closure) were independent risk factors of pancreatic fistulas after DP with a pancreas thicker than 12 mm. A pancreas thicker than 12 mm significantly increased the incidence of pancreatic fistulas after DP using stapler closure. Copyright © 2013 Elsevier Inc. All rights reserved.

  9. 49 CFR 179.400 - General specification applicable to cryogenic liquid tank car tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... liquid tank car tanks. 179.400 Section 179.400 Transportation Other Regulations Relating to... MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specification for Cryogenic Liquid Tank Car Tanks and... liquid tank car tanks. ...

  10. 49 CFR 172.330 - Tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Tank cars and multi-unit tank car tanks. 172.330..., TRAINING REQUIREMENTS, AND SECURITY PLANS Marking § 172.330 Tank cars and multi-unit tank car tanks. (a... material— (1) In a tank car unless the following conditions are met: (i) The tank car must be marked on...

  11. 49 CFR 172.330 - Tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Tank cars and multi-unit tank car tanks. 172.330..., TRAINING REQUIREMENTS, AND SECURITY PLANS Marking § 172.330 Tank cars and multi-unit tank car tanks. (a... material— (1) In a tank car unless the following conditions are met: (i) The tank car must be marked on...

  12. 49 CFR 172.330 - Tank cars and multi-unit tank car tanks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Tank cars and multi-unit tank car tanks. 172.330..., TRAINING REQUIREMENTS, AND SECURITY PLANS Marking § 172.330 Tank cars and multi-unit tank car tanks. (a... material— (1) In a tank car unless the following conditions are met: (i) The tank car must be marked on...

  13. 40 CFR 264.258 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Piles § 264.258 Closure and post-closure care. (a) At closure, the owner or operator must remove... that apply to landfills (§ 264.310). (c)(1) The owner or operator of a waste pile that does not comply...(c) or § 264.251(b), must: (i) Include in the closure plan for the pile under § 264.112 both a plan...

  14. The Effect of Rural Hospital Closures on Community Economic Health

    PubMed Central

    Holmes, George M; Slifkin, Rebecca T; Randolph, Randy K; Poley, Stephanie

    2006-01-01

    Objective To examine the effect of rural hospital closures on the local economy. Data Sources U.S. Census Bureau, OSCAR, Medicare Cost Reports, and surveys of individuals knowledgeable about local hospital closures. Study Design Economic data at the county level for 1990–2000 were combined with information on hospital closures. The study sample was restricted to rural counties experiencing a closure during the sample period. Longitudinal regression methods were used to estimate the effect of hospital closure on per-capita income, unemployment rate, and other community economic measures. Models included both leading and lagged closure terms allowing a preclosure economic downturn as well as time for the closure to be fully realized by the community. Data Collection Information on closures was collected by contacting every state hospital association, reconciling information gathered with that contained in the American Hospital Association file and OIG reports. Principal Findings Results indicate that the closure of the sole hospital in the community reduces per-capita income by $703 (p<0.05) or 4 percent (p<0.05) and increases the unemployment rate by 1.6 percentage points (p<0.01). Closures in communities with alternative sources of hospital care had no long-term economic impact, although income decreased for 2 years following the closure. Conclusions The local economic effects of a hospital closure should be considered when regulations that affect hospitals' financial well-being are designed or changed. PMID:16584460

  15. Benzene contamination at a metal plating facility

    NASA Astrophysics Data System (ADS)

    Memon, B. A.; Burston, M. R.

    2005-08-01

    A metal plating facility in central Kentucky was required to complete a RCRA Facility Investigation to address a number of Solid Waste Management Units at the site. Twenty monitoring wells were installed at the facility. Ground water from the wells was sampled for total and dissolved metals, polychlorinated biphenyls, acid extractable compounds, base neutral compounds, and volatile organic compounds. Unexpectedly, relatively large concentrations of benzene, up to 120 μg/l, were detected in samples from some of the wells, including wells that should have been hydraulically upgradient from the facility. As a result of the detection of benzene, the facility completed an investigation to identify the source. A nearby facility had completed a gasoline underground storage tank (UST) closure at about the time of the installation of the 20 wells. Reportedly the UST had small holes when removed. Three potential pathways of migration (a ditch, sanitary sewer, and a sink hole) from the nearby facility to the metal-plating facility and residual soils with very large concentrations of benzene, toluene, ethylbenzene, and xylenes have been identified.

  16. APPARATUS AND METHOD FOR WELDING END CLOSURE TO CONTAINER

    DOEpatents

    Frantz, C.E.; Correy, T.B.

    1959-08-01

    A semi-automatic apparatus is described for welding a closure to the open end of a can containing a nuclear fuel slug. An arc is struck at the center of the closure and is shifted to a region near its periphery. Then the assembly of closure, can, and fuel slug is rotated so that the peripheral region of the closure is preheated. Next the arc is shifted to the periphery itself of the closure, and the assembly is rotated so that the closure is welded to the can.

  17. Modeling Progressive Damage Using Local Displacement Discontinuities Within the FEAMAC Multiscale Modeling Framework

    NASA Technical Reports Server (NTRS)

    Ranatunga, Vipul; Bednarcyk, Brett A.; Arnold, Steven M.

    2010-01-01

    A method for performing progressive damage modeling in composite materials and structures based on continuum level interfacial displacement discontinuities is presented. The proposed method enables the exponential evolution of the interfacial compliance, resulting in unloading of the tractions at the interface after delamination or failure occurs. In this paper, the proposed continuum displacement discontinuity model has been used to simulate failure within both isotropic and orthotropic materials efficiently and to explore the possibility of predicting the crack path, therein. Simulation results obtained from Mode-I and Mode-II fracture compare the proposed approach with the cohesive element approach and Virtual Crack Closure Techniques (VCCT) available within the ABAQUS (ABAQUS, Inc.) finite element software. Furthermore, an eccentrically loaded 3-point bend test has been simulated with the displacement discontinuity model, and the resulting crack path prediction has been compared with a prediction based on the extended finite element model (XFEM) approach.

  18. Positive Catch & Economic Benefits of Periodic Octopus Fishery Closures: Do Effective, Narrowly Targeted Actions 'Catalyze' Broader Management?

    PubMed

    Oliver, Thomas A; Oleson, Kirsten L L; Ratsimbazafy, Hajanaina; Raberinary, Daniel; Benbow, Sophie; Harris, Alasdair

    2015-01-01

    Eight years of octopus fishery records from southwest Madagascar reveal significant positive impacts from 36 periodic closures on: (a) fishery catches and (b) village fishery income, such that (c) economic benefits from increased landings outweigh costs of foregone catch. Closures covered ~20% of a village's fished area and lasted 2-7 months. Octopus landings and catch per unit effort (CPUE) significantly increased in the 30 days following a closure's reopening, relative to the 30 days before a closure (landings: +718%, p<0.0001; CPUE: +87%, p<0.0001; n = 36). Open-access control sites showed no before/after change when they occurred independently of other management ("no ban", n = 17/36). On the other hand, open-access control sites showed modest catch increases when they extended a 6-week seasonal fishery shutdown ("ban", n = 19/36). The seasonal fishery shutdown affects the entire region, so confound all potential control sites. In villages implementing a closure, octopus fishery income doubled in the 30 days after a closure, relative to 30 days before (+132%, p<0.001, n = 28). Control villages not implementing a closure showed no increase in income after "no ban" closures and modest increases after "ban" closures. Villages did not show a significant decline in income during closure events. Landings in closure sites generated more revenue than simulated landings assuming continued open-access fishing at that site (27/36 show positive net earnings; mean +$305/closure; mean +57.7% monthly). Benefits accrued faster than local fishers' time preferences during 17-27 of the 36 closures. High reported rates of illegal fishing during closures correlated with poor economic performance. We discuss the implications of our findings for broader co-management arrangements, particularly for catalyzing more comprehensive management.

  19. Lace Up for Healthy Feet: The Impact of Shoe Closure on Plantar Stress Response.

    PubMed

    Rahemi, Hadi; Armstrong, David G; Enriquez, Ana; Owl, Joshua; Talal, Talal K; Najafi, Bijan

    2017-07-01

    This study examined the impact of shoe closure on plantar thermal stress response (TSR), which is known to be a surrogate of shear stress and skin perfusion. It is aimed to explore potential impact of shoe closure on increasing risk factors associated with plantar ulcers in people with diabetic peripheral neuropathy (DPN). Fifteen eligible subjects were enrolled. The left foot was used as a reference and fitted to a self-adjusted and habitual lace-tightening method by each subject. The right foot was used as a test closure and fitted into three lace closure conditions: loose, tight, and preset optimal closure (reel clutch, BOA technology). Thermal images were taken after 5 minutes of acclimatization (pre-trial) and immediately after 200 walking steps in each shoe closure condition (post-trial). TSR was calculated from the thermal images. TSR was significantly higher in the test closure with loose (70.24%, P = .000) and tight (66.85%, P = .007) and lower (-206.53%, P = .000) in the preset optimal closure when compared to the reference closure. Only lace closure conditions affected TSR with no significant impact from age, BMI, and gender in our sample in a multivariable regression model. The results from this study suggest that shoelace closure technique can have a profound effect on TSR. It therefore stands to reason that optimal lace closure may have an impact in reducing risk of plantar ulcers in people with DPN. Interestingly, results revealed that even a self-adjusted lace closure may not be necessarily optimal and a preset closure setting like reel clutch might ultimately be recommended to minimize risk. Further study is warranted to confirm or refute these interesting results.

  20. [Factors influencing the prognosis of patent ductus arteriosus in very low birth weight infants].

    PubMed

    Wang, Chen-Hong; Shi, Li-Ping; Ma, Xiao-Lu; Luo, Fang; Chen, Zheng; Lin, Hui-Jia; DU, Li-Zhong

    2016-08-01

    To investigate the factors influencing the prognosis of patent ductus arteriosus (PDA) in very low birth weight (VLBW) infants. A total of 194 VLBW infants who were admitted from January 2012 to December 2014 were enrolled as study subjects. According to cardiac ultrasound findings and treatment outcome, these infants were divided into non-PDA group, spontaneous closure group, pharmaceutical closure group, and surgical closure group. Their clinical and echocardiographic characteristics were analyzed. The spontaneous closure rate of PDA was 58.7%. The spontaneous closure group showed significantly higher gestational age, birth weight, and proportion of small-for-gestational-age infants than the pharmaceutical and surgical closure groups (P<0.05). The pharmaceutical and surgical closure groups had a significantly higher incidence rate of neonatal respiratory distress syndrome and a significantly higher proportion of infants who were given pulmonary surfactant (PS) than the spontaneous closure group (P<0.05). During different periods of time, the spontaneous closure group had a significantly smaller ductus arteriosus diameter than the pharmaceutical and surgical closure groups (P<0.05). The multivariate logistic regression analysis showed that gestational age, application of PS, and ductus arteriosus diameter at 48 hours were significantly associated with the prognosis of PDA. The major transductal flow pattern in the spontaneous closure group was closing pattern, while in the pharmaceutical and surgical closure groups, the main flow patterns were pulmonary hypertension and growing patterns within 48 hours and growing pattern on days 4 and 7. The VLBW infants have a high spontaneous closure rate of PDA. A decreased closure rate of PDA is associated with the lower gestational age and the application of PS. PDA with a large ductus arteriosus diameter and a growing or pulsatile flow pattern cannot easily achieve spontaneous closure.

Top