Sample records for task 5 program management

  1. Defense Acquisition University (DAU) Program Managers Tool Kit

    DTIC Science & Technology

    2008-03-01

    SUBTITLE Program Managers Tool Kit 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK...strve for optmal solutons, seek better ways to manage, and provde lessons -learned to those who follow; • be candd about program status, ncludng...practces, lessons learned, and rsks to avod; • valdated practces wth consstent, verfiable nformaton; • an actve knowledge base to help wth

  2. What Program Managers Need to Know: A New Book to Accelerate Acquisition Competence

    DTIC Science & Technology

    2015-02-01

    FEB 2015 2. REPORT TYPE 3. DATES COVERED 00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE What Program Managers Need to Know: A New Book to...Accelerate Acquisition Competence 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...ANSI Std Z39-18 What Program Managers Need to Know A New Book to Accelerate Acquisition Competence Col. William T. Cooley n Brian C. Ruhm Cooley is

  3. SOLID STATE ENERGY CONVERSION ALLIANCE DELPHI SOLID OXIDE FUEL CELL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steven Shaffer; Sean Kelly; Subhasish Mukerjee

    2004-05-07

    The objective of this project is to develop a 5 kW Solid Oxide Fuel Cell power system for a range of fuels and applications. During Phase I, the following will be accomplished: Develop and demonstrate technology transfer efforts on a 5 kW stationary distributed power generation system that incorporates steam reforming of natural gas with the option of piped-in water (Demonstration System A). Initiate development of a 5 kW system for later mass-market automotive auxiliary power unit application, which will incorporate Catalytic Partial Oxidation (CPO) reforming of gasoline, with anode exhaust gas injected into an ultra-lean burn internal combustion engine.more » This technical progress report covers work performed by Delphi from July 1, 2003 to December 31, 2003, under Department of Energy Cooperative Agreement DE-FC-02NT41246. This report highlights technical results of the work performed under the following tasks: Task 1 System Design and Integration; Task 2 Solid Oxide Fuel Cell Stack Developments; Task 3 Reformer Developments; Task 4 Development of Balance of Plant (BOP) Components; Task 5 Manufacturing Development (Privately Funded); Task 6 System Fabrication; Task 7 System Testing; Task 8 Program Management; Task 9 Stack Testing with Coal-Based Reformate; and Task 10 Technology Transfer from SECA CORE Technology Program. In this reporting period, unless otherwise noted Task 6--System Fabrication and Task 7--System Testing will be reported within Task 1 System Design and Integration. Task 8--Program Management, Task 9--Stack Testing with Coal Based Reformate, and Task 10--Technology Transfer from SECA CORE Technology Program will be reported on in the Executive Summary section of this report.« less

  4. 78 FR 78493 - National Rural Transportation Assistance Program: Solicitation for Proposals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... 5. Task 5: RTAP Rural Resource Center 6. Task 6: Peer-to-Peer Networking 7. Task 7: Research and... for networking with State RTAP managers while establishing communication for information dissemination... Community Edition (DNN) version 05.06.02 (144). 6. Task 6: Peer-to-Peer Networking The recipient will...

  5. Management Auditing. Evaluation of the Marine Corps Task Analysis Program. Technical Report No. 5.

    ERIC Educational Resources Information Center

    Hemphill, John M., Jr.; Yoder, Dale

    The management audit is described for possible application as an extension of the mission of the Office of Manpower Utilization (OMU) of the U.S. Marine Corps. The present mission of OMU is viewed as a manpower research program to conduct task analysis of Marine Corps occupational fields. Purpose of the analyses is to improve the functional areas…

  6. Risk Management and Critical Infrastructure Protection: Assessing, Integrating, and Managing Threats, Vulnerabilities and Consequences

    DTIC Science & Technology

    2005-02-04

    Consequences 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7...OSLGCP). The OSLGCP now administers the grants programs. 37 According to the guidance, threat assessment determines the relative likelihood of a...Preparedness (OSLGCP) administers two grant programs that give states the opportunity to identify critical infrastructure assets: the State Homeland Security

  7. Geospace Plasma Dynamics Laboratory Annual Task Report (FY11)

    DTIC Science & Technology

    2012-03-01

    Site Contractors: Nagendra Singh, Ph.D., Physicist , 0.5 MY Neil Grossbard, M.S., Mathematician , 0.7 MY Visitors: Publications: Articles in...PhD Project Manager Division Chief, RVB This report is published in the interest of scientific and technical...Annual Task Report (FY11) 5c. PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) 5d. PROJECT NUMBER 2311 Daniel Ober 5e. TASK NUMBER

  8. Risk Management and Critical Infrastructure Protection: Assessing, Integrating, and Managing Threats, Vulnerabilities and Consequences

    DTIC Science & Technology

    2004-09-02

    Consequences 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7...OSLGCP now administers the grants programs. 30According to the guidance, threat assessment determines the relative likelihood of a known potential...information on critical infrastructure assets. The Office of State and Local Government Coordination and Preparedness (OSLGCP) administers two grant

  9. Financial Management: Development and Management of the Army Game Project

    DTIC Science & Technology

    2005-08-24

    Financial Management Department of Defense Office of Inspector General August 24, 2005 Development and Management of the Army Game Project (D-2005...Management of the Army Game Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704 Acronyms AGP Army Game Project FMR

  10. Absenteeism Management

    DTIC Science & Technology

    1995-01-01

    1995 Ship Production Symposium Paper No. 24: Absenteeism Manage- ment U.S. DEPARTMENT OF THE NAVY CARDEROCK DIVISION, NAVAL SURFACE WARFARE CENTER...Paper No. 24: Absenteeism Management 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Surface Warfare Center CD Code 2230 - Design Integration Tools Bldg

  11. Early Training Estimation System (ETES). Appendix F. User’s Guide

    DTIC Science & Technology

    1984-06-01

    Related to Early Training Estimation 2-17 2-5 Organizations Interviewed During Task 1 2-17 2-6 Potential Problem Solving Aids 2-24 2-7 Task Deletion...tasks are available, only the training program elements must be estimated. Thus, by adding comparability analysis procedures to SDT data base management...data base manage- ment capabilities of the SDT, and (3) conduct trade-off studies of proposed solutions to identified training problems . 1-17

  12. Report by the International Space Station (ISS) Management and Cost Evaluation (IMCE) Task Force

    NASA Technical Reports Server (NTRS)

    Young, A. Thomas; Kellogg, Yvonne (Technical Monitor)

    2001-01-01

    The International Space Station (ISS) Management and Cost Evaluation Task Force (IMCE) was chartered to conduct an independent external review and assessment of the ISS cost, budget, and management. In addition, the Task Force was asked to provide recommendations that could provide maximum benefit to the U.S. taxpayers and the International Partners within the President's budget request. The Task Force has made the following principal findings: (1) The ISS Program's technical achievements to date, as represented by on-orbit capability, are extraordinary; (2) The Existing ISS Program Plan for executing the FY 02-06 budget is not credible; (3) The existing deficiencies in management structure, institutional culture, cost estimating, and program control must be acknowledged and corrected for the Program to move forward in a credible fashion; (4) Additional budget flexibility, from within the Office of Space Flight (OSF) must be provided for a credible core complete program; (5) The research support program is proceeding assuming the budget that was in place before the FY02 budget runout reduction of $1B; (6) There are opportunities to maximize research on the core station program with modest cost impact; (7) The U.S. Core Complete configuration (three person crew) as an end-state will not achieve the unique research potential of the ISS; (8) The cost estimates for the U.S.-funded enhancement options (e.g., permanent seven person crew) are not sufficiently developed to assess credibility. After these findings, the Task Force has formulated several primary recommendations which are published here and include: (1) Major changes must be made in how the ISS program is managed; (2) Additional cost reductions are required within the baseline program; (3) Additional funds must be identified and applied from the Human Space Flight budget; (4) A clearly defined program with a credible end-state, agreed to by all stakeholders, must be developed and implemented.

  13. Space station data system analysis/architecture study. Task 5: Program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.

  14. Life as a NATO Engineer

    DTIC Science & Technology

    2010-08-01

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...management; leads military in case of specialized survey; supervises more than 25 local civilian employees ; acts as technical expert during contract...Security Assistance Force Head- quarters Camp. I knew I could handle the job of project manager, but wondered about acting as contract manager, technical ex

  15. Hierarchical Trust Management of COI in Heterogeneous Mobile Networks

    DTIC Science & Technology

    2017-08-01

    PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 5c. PROGRAM ELEMENT NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER Form Approved OMB NO. 0704...Report: Hierarchical Trust Management of COI in Heterogeneous Mobile Networks The views, opinions and/or findings contained in this report are those of...Institute & State University Title: Hierarchical Trust Management of COI in Heterogeneous Mobile Networks Report Term: 0-Other Email: irchen@vt.edu

  16. An Agent-Based Cockpit Task Management System

    NASA Technical Reports Server (NTRS)

    Funk, Ken

    1997-01-01

    An agent-based program to facilitate Cockpit Task Management (CTM) in commercial transport aircraft is developed and evaluated. The agent-based program called the AgendaManager (AMgr) is described and evaluated in a part-task simulator study using airline pilots.

  17. Space station data system analysis/architecture study. Task 3: Trade studies, DR-5, volume 2

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Results of a Space Station Data System Analysis/Architecture Study for the Goddard Space Flight Center are presented. This study, which emphasized a system engineering design for a complete, end-to-end data system, was divided into six tasks: (1); Functional requirements definition; (2) Options development; (3) Trade studies; (4) System definitions; (5) Program plan; and (6) Study maintenance. The Task inter-relationship and documentation flow are described. Information in volume 2 is devoted to Task 3: trade Studies. Trade Studies have been carried out in the following areas: (1) software development test and integration capability; (2) fault tolerant computing; (3) space qualified computers; (4) distributed data base management system; (5) system integration test and verification; (6) crew workstations; (7) mass storage; (8) command and resource management; and (9) space communications. Results are presented for each task.

  18. An Analysis of the Radio Program Manager Occupation.

    ERIC Educational Resources Information Center

    Friedberg, Jerry; Stella, Phillip.

    This occupational analysis data was assembled to help broadcasting arts teachers develop a course of study in program management for junior and senior high school students. Following a job description for a program manager, the remainder of the content in standard task analysis format presents an analysis of nine program management duties (tasks).…

  19. Determining Potential in the Army’s Officer Corps: Leveraging Technology to Manage and Promote Active Duty Captains Based on Merit

    DTIC Science & Technology

    2017-06-09

    DETERMINING POTENTIAL IN THE ARMY’S OFFICER CORPS: LEVERAGING TECHNOLOGY TO MANAGE AND PROMOTE ACTIVE DUTY CAPTAINS BASED ON MERIT...Determining Potential in the Army’s Officer Corps: Leveraging Technology to Manage and Promote Active Duty Captains Based on Merit 5a. CONTRACT...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Major Ross Carlos Pixler 5d. PROJECT NUMBER 5e. TASK NUMBER 5f

  20. Microgravity Science and Applications Program Tasks, 1984 Revision

    NASA Technical Reports Server (NTRS)

    Pentecost, E. (Compiler)

    1985-01-01

    This report is a compilation of the active research tasks as of the end of the fiscal year 1984 of the Microgravity Science and Applications Program, NASA-Office of Space Science and Applications, involving several NASA centers and other organizations. The purpose of the document is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. The report is structured to include an introductory description of the program, strategy and overall goal; identification of the organizational structures and people involved; and a description of each research task, together with a list of recent publications. The tasks are grouped into six categories: (1) electronic materials; (2) solidification of metals, alloys, and composites; (3) fluid dynamics and transports; (4) biotechnology; (5) glasses and ceramics; and (6) combustion.

  1. Development of a standardized job description for healthcare managers of metabolic syndrome management programs in Korean community health centers.

    PubMed

    Lee, Youngjin; Choo, Jina; Cho, Jeonghyun; Kim, So-Nam; Lee, Hye-Eun; Yoon, Seok-Jun; Seomun, GyeongAe

    2014-03-01

    This study aimed to develop a job description for healthcare managers of metabolic syndrome management programs using task analysis. Exploratory research was performed by using the Developing a Curriculum method, the Intervention Wheel model, and focus group discussions. Subsequently, we conducted a survey of 215 healthcare workers from 25 community health centers to verify that the job description we created was accurate. We defined the role of healthcare managers. Next, we elucidated the tasks of healthcare managers and performed needs analysis to examine the frequency, importance, and difficulty of each of their duties. Finally, we verified that our job description was accurate. Based on the 8 duties, 30 tasks, and 44 task elements assigned to healthcare managers, we found that the healthcare managers functioned both as team coordinators responsible for providing multidisciplinary health services and nurse specialists providing health promotion services. In terms of importance and difficulty of tasks performed by the healthcare managers, which were measured using a determinant coefficient, the highest-ranked task was planning social marketing (15.4), while the lowest-ranked task was managing human resources (9.9). A job description for healthcare managers may provide basic data essential for the development of a job training program for healthcare managers working in community health promotion programs. Copyright © 2014. Published by Elsevier B.V.

  2. Treatment-Based Classification versus Usual Care for Management of Low Back Pain

    DTIC Science & Technology

    2017-10-01

    AWARD NUMBER: W81XWH-11-1-0657 TITLE: Treatment-Based Classification versus Usual Care for Management of Low Back Pain PRINCIPAL INVESTIGATOR...Treatment-Based Classification versus Usual Care for Management of Low Back Pain 5b. GRANT NUMBER W81XWH-11-1-0657 5c. PROGRAM ELEMENT NUMBER 6...AUTHOR(S) MAJ Daniel Rhon – daniel_rhon@baylor.edu 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S

  3. Solid State Energy Conversion Alliance Delphi SOFC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steven Shaffer; Gary Blake; Sean Kelly

    2006-12-31

    The following report details the results under the DOE SECA program for the period July 2006 through December 2006. Developments pertain to the development of a 3 to 5 kW Solid Oxide Fuel Cell power system for a range of fuels and applications. This report details technical results of the work performed under the following tasks for the SOFC Power System: Task 1 SOFC System Development; Task 2 Solid Oxide Fuel Cell Stack Developments; Task 3 Reformer Developments; Task 4 Development of Balance of Plant Components; Task 5 Project Management; and Task 6 System Modeling & Cell Evaluation for Highmore » Efficiency Coal-Based Solid Oxide Fuel Cell Gas Turbine Hybrid System.« less

  4. El Ro De Gente: U.S. Military Role in Joint, Interagency, Intergovernmental, and Multi-National Operations to Help Manage the River of People from Central America to the U.S.

    DTIC Science & Technology

    2016-06-10

    THE U.S. 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) CDR Brett T. Baker, USN 5d. PROJECT NUMBER 5e. TASK...32 D. Enhance the Foreign Service Officer Program ... programs and grants directing financial resources to target specific problems. While some diplomacy is required to coordinate this, the U.S. military is

  5. El Rio De Gente: U.S. Military Role In Joint, Interagency, Intergovernmental, and Multi-National (JIIM) Operations to Help Manage the River of People from Central America to the U.S.

    DTIC Science & Technology

    2016-06-10

    THE U.S. 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) CDR Brett T. Baker, USN 5d. PROJECT NUMBER 5e. TASK...32 D. Enhance the Foreign Service Officer Program ... programs and grants directing financial resources to target specific problems. While some diplomacy is required to coordinate this, the U.S. military is

  6. Continuous Risk Management: A NASA Program Initiative

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  7. Toward Affordable Systems: Portfolio Analysis and Management for Army Science and Technology Programs

    DTIC Science & Technology

    2009-01-01

    PROGRAM ELEMENT NUMBER 6. AUTHOR (S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Rand...Decision Authority MDAP major defense acquisition program Abbreviations xxvii MIC marginal implementation cost MOMC marginal operating and...the Milestone Decision Authority (MDA).1 1 This section is based on U.S. Army, 2003, pp. 30–33. This 2003 Army document had taken into account the

  8. Toward Affordable Systems II: Portfolio Management for Army Science and Technology Programs Under Uncertainties

    DTIC Science & Technology

    2011-01-01

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Rand Corporation ,Arroyo Center,PO Box...2138, 1776 Main Street,Santa Monica,CA,90407-2138 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES...research, development, test , and evaluation programs; and those who are interested in the optimal allocation of funds among different programs and/or

  9. Occupational Survey Report AFSC 3E6X1; Operations Management

    DTIC Science & Technology

    2004-02-01

    Lt Bryan Pickett Feb 04 Occupational Survey Report AFSC 3E6X1 Operations Management I n t e g r i t y - S e r v i c e - E x c e l l e n c e...Report AFSC 3E6X1 Operations Management 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...Nellis AFB NV (5) • Fairchild AFB WA (5) • Hurlburt Field FL (6) • Eglin AFB FL (4) • Ramstein AB (5) Operations Management 3E6X1 February 2004 (Approved

  10. Fusing Social Media and Mobile Analytics for Urban Sense-Making

    DTIC Science & Technology

    2017-05-09

    AFRL-AFOSR-JP-TR-2017-0037 Fusing Social Media and Mobile Analytics for Urban Sense-Making Archan Misra SINGAPORE MANAGEMENT UNIVERSITY Final Report...CONTRACT NUMBER 5b.  GRANT NUMBER FA2386-14-1-0002 5c.  PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) Archan Misra 5d.   PROJECT NUMBER 5e.  TASK...NUMBER 5f.  WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) SINGAPORE MANAGEMENT UNIVERSITY 81 VICTORIA STREET SINGAPORE, 188065 SG 8

  11. Targeted On-Demand Team Performance App Development

    DTIC Science & Technology

    2018-02-01

    ACCOMPLISHMENTS: Major Goals Task Description Status 1 Project Management Administration, oversight and management of all program tasks, expenditures...reporting charts, financial and project management protocols. Create, complete, and submit all documentation for program office and designated... project provided? All subjects participated in simulated emergency medicine events that included concurrent management of three patients with

  12. Natural Resources Management: Task Analyses. Competency-Based Education.

    ERIC Educational Resources Information Center

    James Madison Univ., Harrisonburg, VA.

    This task analysis guide is intended to help teachers and administrators develop instructional materials and implement competency-based education for natural resources management courses in the agricultural resources program. Section 1 contains a validated task inventory for natural resources management. For each task, applicable information…

  13. GANGA: A tool for computational-task management and easy access to Grid resources

    NASA Astrophysics Data System (ADS)

    Mościcki, J. T.; Brochu, F.; Ebke, J.; Egede, U.; Elmsheuser, J.; Harrison, K.; Jones, R. W. L.; Lee, H. C.; Liko, D.; Maier, A.; Muraru, A.; Patrick, G. N.; Pajchel, K.; Reece, W.; Samset, B. H.; Slater, M. W.; Soroko, A.; Tan, C. L.; van der Ster, D. C.; Williams, M.

    2009-11-01

    In this paper, we present the computational task-management tool GANGA, which allows for the specification, submission, bookkeeping and post-processing of computational tasks on a wide set of distributed resources. GANGA has been developed to solve a problem increasingly common in scientific projects, which is that researchers must regularly switch between different processing systems, each with its own command set, to complete their computational tasks. GANGA provides a homogeneous environment for processing data on heterogeneous resources. We give examples from High Energy Physics, demonstrating how an analysis can be developed on a local system and then transparently moved to a Grid system for processing of all available data. GANGA has an API that can be used via an interactive interface, in scripts, or through a GUI. Specific knowledge about types of tasks or computational resources is provided at run-time through a plugin system, making new developments easy to integrate. We give an overview of the GANGA architecture, give examples of current use, and demonstrate how GANGA can be used in many different areas of science. Catalogue identifier: AEEN_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/AEEN_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland Licensing provisions: GPL No. of lines in distributed program, including test data, etc.: 224 590 No. of bytes in distributed program, including test data, etc.: 14 365 315 Distribution format: tar.gz Programming language: Python Computer: personal computers, laptops Operating system: Linux/Unix RAM: 1 MB Classification: 6.2, 6.5 Nature of problem: Management of computational tasks for scientific applications on heterogenous distributed systems, including local, batch farms, opportunistic clusters and Grids. Solution method: High-level job management interface, including command line, scripting and GUI components. Restrictions: Access to the distributed resources depends on the installed, 3rd party software such as batch system client or Grid user interface.

  14. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    NASA Technical Reports Server (NTRS)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  15. Mud Mountain Wildlife Inventory and Habitat Analysis.

    DTIC Science & Technology

    1979-01-01

    PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK Intern Program AREA & WORK UNIT NUMBERS Western Interstate Commission for...RIPARIAN ZONE CHARACTERISTICS .... .......... .26 5 SNAG SUCCESSION CHARACTERISTICS .. .. . .... ... 29 6 THREE SISTERS- GRASS MOUNTAIN AREA ...recommendations appropriate with regard to their wildlife potential. Throughout the report, essential habitat areas have been noted. Management guidelines

  16. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  17. The Partners in Prevention Program: The Evaluation and Evolution of the Task-Centered Case Management Model

    ERIC Educational Resources Information Center

    Colvin, Julanne; Lee, Mingun; Magnano, Julienne; Smith, Valerie

    2008-01-01

    This article reports on the further development of the task-centered model for difficulties in school performance. We used Bailey-Dempsey and Reid's (1996) application of Rothman and Thomas's (1994) design and development framework and annual evaluations of the Partners in Prevention (PIP) Program to refine the task-centered case management model.…

  18. Behavioral Scientists (AFSC 2675), Scientific Managers (AFSC 26169), and Related Specialties.

    DTIC Science & Technology

    1984-12-01

    mitroliche only h : hard copy only A ,ceoo For DTI5 ?RA1 . ." ),, " k -. A’t ’ . .. " " ." , ’ - % ° ’ -" .. . , .. -. • . . . -. . . . - " . TABLE OF...FUNCTIONS 22 K APPLICATIONS OF RESEARCH L MANAGING RESEARCH OR APPLICATIONS PROGRAMS 14 M ORGANIZATIONAL IMPROVEMENT FUNCTIONS it N ACADEMIC INSTRUCTOR...time ratings for each task. For the purpose of organizing individual jobs into similar types of work, an automated job clustering program was used. This

  19. USAF/SCEEE Summer Faculty Research Program (1979). Volume 1

    DTIC Science & Technology

    1979-12-01

    Optimum equipment arrangement for transmit and receive channels (d) Communication circuit performance between ships in a task force 5-11 p.: I ( e ...management and of an efficient communications system, and e ) the format to be used for future programs. The author was selected to assist with the...Problems in Fusion Research, Knoxville, Tennessee, October, 1977, pp. 741-745. 4. C. E . Oberly, Private Communication . 5. G. J. Gabriel, "Theory of

  20. Innovative Methods for Estimating Densities and Detection Probabilities of Secretive Reptiles Including Invasive Constrictors and Rare Upland Snakes

    DTIC Science & Technology

    2018-01-30

    1  Department of Defense Legacy Resource Management Program Agreement # W9132T-14-2-0010 ( Project # 14-754) Innovative Methods for Estimating...Upland Snakes NA 5c. PROGRAM ELEMENT NUMBER NA 6. AUTHOR(S) 5d. PROJECT NUMBER John D. Willson, Ph.D. 14-754 Shannon Pittman, Ph.D. 5e. TASK NUMBER...STATEMENT Publically available 13. SUPPLEMENTARY NOTES NA 14. ABSTRACT This project demonstrates the broad applicability of a novel simulation

  1. Business, Marketing and Management Occupations. Education for Employment Task Lists.

    ERIC Educational Resources Information Center

    Lake County Area Vocational Center, Grayslake, IL.

    The duties and tasks found in these task lists form the basis of instructional content for secondary, postsecondary, and adult occupational training programs for business, marketing, and management occupations. The business, marketing, and management occupations are divided into eight clusters. The clusters and occupations are:…

  2. Medical Management of Chemical Toxicity in Pediatrics

    DTIC Science & Technology

    2009-01-01

    as fever and leukocytosis. Erythrocyte sedimentation rate (ESR) has been shown to be elevated in patients after mustard exposure (Motakallem, 1988...NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Hilmas, E, Hilmas, CJ 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...A). These unique anatomical and physiologic considerations described below cause the rates of absorp- tion, distribution, metabolism, and excretion

  3. The Coast Artillery Journal. Volume 70, Number 5, May 1929

    DTIC Science & Technology

    1929-05-01

    Editor Busine ~ Manager Volume 70 li. S . DESTROYER LAMBERTON May, 1929 CONTENTS Number 5 Frontispiece THE ROLE OF THE 37-mm. FULL AUTOMATIC...5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME... S ) AND ADDRESS(ES) Coast Artillery Training Center,Coast Artillery Journal,Fort Monroe,VA,23651 8. PERFORMING ORGANIZATION REPORT NUMBER 9

  4. Cooperative Networked Control of Dynamical Peer-to-Peer Vehicle Systems

    DTIC Science & Technology

    2007-12-28

    dynamic deployment and task allocation;verification and hybrid systems; and information management for cooperative control. The activity of the...32 5.3 Decidability Results on Discrete and Hybrid Systems ...... .................. 33 5.4 Switched Systems...solved. Verification and hybrid systems. The program has produced significant advances in the theory of hybrid input-output automata, (HIOA) and the

  5. The Effects of Incentives in Acquisition Competition on Program Outcomes

    DTIC Science & Technology

    2012-06-01

    organizational, management, and cultural issues (Madachy, EFFECTS OF INCENTIVES IN ACQUISITION COMPETITION 5 2008, Frangos , 1998). In the SEI’s direct...change from the task force on defense acquisition law and oversight Forrester, J. W. (1971). Principles of systems. Pegasus Communications. Frangos , S

  6. Division B Commission 5: Documentation and Astronomical Data

    NASA Astrophysics Data System (ADS)

    Hanisch, Robert; Wise, Michael; Ohishi, Masatoshi; Andernach, Heinz; Bishop, Marsha; Egret, Daniel; Griffin, Elizabeth; Kembhavi, Ajit; Murphy, Tara; Pasian, Fabio; Schroeder, Anja; Tody, Douglas

    2016-04-01

    IAU Commission 5, Documentation and Astronomical Data, continued its mission of promoting and supporting sound practices of data management, data dissemination, and data preservation over the past three years. The Commission also prepared its proposal for continuation, with some changes in emphasis, after the IAU's commission restructuring program. Below we report on the activities of the various Working Groups and the one Task Force in Commission 5.

  7. Potential Uses of Occupational Analysis Data By Air Force Management Engineering Teams.

    ERIC Educational Resources Information Center

    McFarland, Barry P.

    Both the occupational analysis program and the management engineering program are primarily concerned with task level descriptions of time spent to perform tasks required in the Air Force, the first being personnel specialty code oriented and the second being work center oriented. However two separate and independent techniques have been developed…

  8. Historical Overview of Racism in the Military

    DTIC Science & Technology

    2002-02-01

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR (S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...Sergeant, U.S. Army (Retired) co- authored this publication on behalf of the Defense Equal Opportunity Management Institute (DEOMI). They conducted the...Institute The opinions expressed in this report are those of the authors and should not be construed to represent the official position of DEOMI, the

  9. SOLID STATE ENERGY CONVERSION ALLIANCE DELPHI SOLID OXIDE FUEL CELL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steven Shaffer; Sean Kelly; Subhasish Mukerjee

    2003-12-08

    The objective of Phase I under this project is to develop a 5 kW Solid Oxide Fuel Cell power system for a range of fuels and applications. During Phase I, the following will be accomplished: Develop and demonstrate technology transfer efforts on a 5 kW stationary distributed power generation system that incorporates steam reforming of natural gas with the option of piped-in water (Demonstration System A). Initiate development of a 5 kW system for later mass-market automotive auxiliary power unit application, which will incorporate Catalytic Partial Oxidation (CPO) reforming of gasoline, with anode exhaust gas injected into an ultra-lean burnmore » internal combustion engine. This technical progress report covers work performed by Delphi from January 1, 2003 to June 30, 2003, under Department of Energy Cooperative Agreement DE-FC-02NT41246. This report highlights technical results of the work performed under the following tasks: Task 1 System Design and Integration; Task 2 Solid Oxide Fuel Cell Stack Developments; Task 3 Reformer Developments; Task 4 Development of Balance of Plant (BOP) Components; Task 5 Manufacturing Development (Privately Funded); Task 6 System Fabrication; Task 7 System Testing; Task 8 Program Management; and Task 9 Stack Testing with Coal-Based Reformate.« less

  10. Joint Assessment of Renewable Energy and Water Desalination Research Center (REWDC) Program Capabilities and Facilities In Radioactive Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissani, M; Fischer, R; Kidd, S

    2006-04-03

    The primary goal of this visit was to perform a joint assessment of the Renewable Energy and Water Desalination Center's (REWDC) program in radioactive waste management. The visit represented the fourth technical and scientific interaction with Libya under the DOE/NNSA Sister Laboratory Arrangement. Specific topics addressed during the visit focused on Action Sheet P-05-5, ''Radioactive Waste Management''. The Team, comprised of Mo Bissani (Team Lead), Robert Fischer, Scott Kidd, and Jim Merrigan, consulted with REWDC management and staff. The team collected information, discussed particulars of the technical collaboration and toured the Tajura facility. The tour included the waste treatment facility,more » waste storage/disposal facility, research reactor facility, hot cells and analytical labs. The assessment team conducted the first phase of Task A for Action Sheet 5, which involved a joint assessment of the Radioactive Waste Management Program. The assessment included review of the facilities dedicated to the management of radioactive waste at the Tourja site, the waste management practices, proposed projects for the facility and potential impacts on waste generation and management.« less

  11. Identifying and Mitigating Risks in Security Sector Assistance for Africa’s Fragile States

    DTIC Science & Technology

    2015-01-01

    The Logframe Handbook: A Logical Framework Approach to Project Cycle Management , Washington, D.C., 2005. 34 Identifying and Mitigating Risks in SSA...Fragile States 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER... Project Unique Identification Code (PUIC) for the project that produced this document is HQD126409. v Contents Preface

  12. Hazardous waste management at the local level; The Anchorage, Alaska experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wigglesworth, D.

    1989-07-01

    The need to manage hazardous wastes in the municipality of Anchorage, Alaska, has become increasingly evident in recent years. A task force, representing a broad cross-section of the community, was appointed by the mayor to develop a waste management plan that would address community concerns. Between 1984 and 1986, the Anchorage Hazardous Waste Task Force, supported by municipal staff, local consultants and volunteers from the community developed a plan emphasizing local responsibility and pollution prevention, using management capabilities and technical assistance. This paper describes the development of a non-regulatory hazardous waste management program in Anchorage, Alaska. Plan elements, program fundingmore » and the key role of the local Hazardous Waste Task Force are discussed.« less

  13. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owens, C. M.

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  14. A Study of Program Manager Effectiveness and Risk Taking Propensity

    DTIC Science & Technology

    1988-09-01

    Kelly Sherwin, my section leader , has been a great source of leadership and inspiration . Next, I would like to thank Lieutenant Colonel Fred Westfall...managers peiZ.rm ten basic tasks which can be broken into three categories. The categories and tasks are: Interpersonal Roles 1. Figurehead 2. Leader 3...17:59). When-a program manager is successful, he is not necessarily effective (10:10). Luthans studied this phenomenon by examining the managerial

  15. Naval Postgraduate School Research. Volume 14, Number 1, February 2004

    DTIC Science & Technology

    2004-02-01

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...this review were to ensure officers continue to receive high quality, relevant, and responsive graduate education aligned to defense needs...Initiative (COSSI), Earned Value Management System (EVMS), Activity-Based Costing (ABC), Value Engineering, and lessons from R-TOC Pilots. Sponsored

  16. LMS and New Media

    DTIC Science & Technology

    2009-08-19

    Management of Social Media The Caring Personal Agent SUSAN BULL1, JIM GREER2, GORD MCCALLA2 1 Educational Technology Research Group, Electronic...Discussion Forums, Leader Education , On Demand Learning . 24 Cianciolo, A. (2008) Study Report 2008-05. Program Evaluation for U.S. Army Lifelong...AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Advanced Decision Learning (ADL

  17. Slotted Waveguide Antenna Stiffened Structures (SWASS) Development for Commercial Off-the-Shelf (COTS) Radar (Briefing Charts)

    DTIC Science & Technology

    2016-10-01

    BRIEFING CHARTS) D. Zeppettella Structures Technology Branch Aerospace Vehicles Division Steve Bucca and Thomas Gage BerrieHill Research...R. WIPPERMAN, Chief Program Manager Structures Technology Branch Structures Technology Branch Aerospace Vehicles Division Aerospace Vehicles...Corporation) 5d. PROJECT NUMBER 4920 5e. TASK NUMBER 5f. WORK UNIT NUMBER Q06A 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING

  18. Agriculture Business and Management.

    ERIC Educational Resources Information Center

    Seperich, George; And Others

    This curriculum guide is intended for vocational agriculture teachers who deliver agricultural business and management programs at the secondary or postsecondary level. It is based on the Arizona validated occupational competencies and tasks for management and supervisory positions in agricultural business. The competency/skill and task list…

  19. Security-aware Virtual Machine Allocation in the Cloud: A Game Theoretic Approach

    DTIC Science & Technology

    2015-01-13

    predecessor, however, this paper used empirical evidence and actual data from running experiments on the Amazon EC2 cloud . They began by running all 5...is through effective VM allocation management of the cloud provider to ensure delivery of maximum security for all cloud users. The negative... Cloud : A Game Theoretic Approach 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f

  20. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  1. Task Management for Firefighters: A Practical Approach to Task Management.

    ERIC Educational Resources Information Center

    Roberts, Stephen S.

    1979-01-01

    A project management system for organizing requests from multiple departments and controlling the workload of the development/maintenance computer staff is described. Practical solutions to deciding project priorities, determining time estimates, creating positive peer pressure among programing staff, and formalizing information requests are…

  2. IT Workforce: Key Practices Help Ensure Strong Integrated Program Teams; Selected Departments Need to Assess Skill Gaps

    DTIC Science & Technology

    2016-11-01

    personnel, career paths for program managers, plans to strengthen program management, and use of special hiring authorities) Monitor and report...agencies with direct hiring authority for program managers and directed OPM to create a specialized career path. OMB also tasked agencies with...guidance for developing career paths for IT program managers.14 OPM’s career path guide was to build upon its IT Program Management Competency Model

  3. Continuous Risk Management at NASA

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  4. CREASE 6.0 Catalog of Resources for Education in Ada and Software Engineering

    DTIC Science & Technology

    1992-02-01

    Programming Software Engineering Strong Typing Tasking Audene . Computer Scientists Terbook(s): Barnes, J. Programming in Ada, 3rd ed. Addison-Wesley...Ada. Concept: Abstract Data Types Management Overview Package Real-Time Programming Tasking Audene Computer Scientists Textbook(s): Barnes, J

  5. Program Management Tool

    NASA Technical Reports Server (NTRS)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

  6. MAT - MULTI-ATTRIBUTE TASK BATTERY FOR HUMAN OPERATOR WORKLOAD AND STRATEGIC BEHAVIOR RESEARCH

    NASA Technical Reports Server (NTRS)

    Comstock, J. R.

    1994-01-01

    MAT, a Multi-Attribute Task battery, gives the researcher the capability of performing multi-task workload and performance experiments. The battery provides a benchmark set of tasks for use in a wide range of laboratory studies of operator performance and workload. MAT incorporates tasks analogous to activities that aircraft crew members perform in flight, while providing a high degree of experiment control, performance data on each subtask, and freedom to use non-pilot test subjects. The MAT battery primary display is composed of four separate task windows which are as follows: a monitoring task window which includes gauges and warning lights, a tracking task window for the demands of manual control, a communication task window to simulate air traffic control communications, and a resource management task window which permits maintaining target levels on a fuel management task. In addition, a scheduling task window gives the researcher information about future task demands. The battery also provides the option of manual or automated control of tasks. The task generates performance data for each subtask. The task battery may be paused and onscreen workload rating scales presented to the subject. The MAT battery was designed to use a serially linked second computer to generate the voice messages for the Communications task. The MATREMX program and support files, which are included in the MAT package, were designed to work with the Heath Voice Card (Model HV-2000, available through the Heath Company, Benton Harbor, Michigan 49022); however, the MATREMX program and support files may easily be modified to work with other voice synthesizer or digitizer cards. The MAT battery task computer may also be used independent of the voice computer if no computer synthesized voice messages are desired or if some other method of presenting auditory messages is devised. MAT is written in QuickBasic and assembly language for IBM PC series and compatible computers running MS-DOS. The code in MAT is written for Microsoft QuickBasic 4.5 and Microsoft Macro Assembler 5.1. This package requires a joystick and EGA or VGA color graphics. An 80286, 386, or 486 processor machine is highly recommended. The standard distribution medium for MAT is a 5.25 inch 360K MS-DOS format diskette. The files are compressed using the PKZIP file compression utility. PKUNZIP is included on the distribution diskette. MAT was developed in 1992. IBM PC is a registered trademark of International Business Machines. MS-DOS, Microsoft QuickBasic, and Microsoft Macro Assembler are registered trademarks of Microsoft Corporation. PKZIP and PKUNZIP are registered trademarks of PKWare, Inc.

  7. Materials processing in space program tasks

    NASA Technical Reports Server (NTRS)

    Mckannan, E. C. (Editor)

    1978-01-01

    A list of active research tasks as of the end of 1978 of the Materials Processing in Space Program of the Office of Space and Terrestrial Applications, involving several NASA Centers and other organizations is reported. An overview of the program scope for managers and scientists in industry, university and government communities is provided. The program, its history, strategy and overall goal; the organizational structures and people involved; and each research task are described. Tasks are categorized by ground based research according to four process areas. Cross references to the performing organizations and principal investigators are provided.

  8. Signal Corps and Military Intelligence Officer Perceptions of a Multifunctional Branch Merger

    DTIC Science & Technology

    2015-06-12

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Martin, Johnathan P. Major US Army 5d. PROJECT NUMBER 5e. TASK...Commander, Lieutenant General Edward Cardon summed up the issue during a speaking engagement at CGSC stating: “We at the senior leader level are...Intelligence officers. The talent management aspect of the branch structure appears to be the impetus for creating a separate Cyber branch. Cardon said as

  9. Hybrid Memory Management for Parallel Execution of Prolog on Shared Memory Multiprocessors

    DTIC Science & Technology

    1990-06-01

    organizing data to increase locality. The stack structure exhibits greater locality than the heap structure. Tradeoff decisions can also be made on...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...University of California at Berkeley,Department of Electrical Engineering and Computer Sciences,Berkeley,CA,94720 8. PERFORMING ORGANIZATION REPORT

  10. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  11. Systems approach provides management control of complex programs

    NASA Technical Reports Server (NTRS)

    Dudek, E. F., Jr.; Mc Carthy, J. F., Jr.

    1970-01-01

    Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.

  12. MSFC personnel management tasks: Recruitment and orientation of new employees

    NASA Technical Reports Server (NTRS)

    Brindley, T. A.

    1980-01-01

    In order to encourage highly motivated young students to learn about NASA and consider it for a career, a formal program is to be initiated whereby selected students can work on a voluntary basis at Marshall Space Flight Center (MSFC). The first task was to develop the working plan and procedures for this program, called Student Volunteer Service Program, in the writing of MSFC official guidelines, the Marshall Management Instruction (the MMI) which is a binding document that defines policy and establishes procedures and guidelines. Particular considerations written into the MMI after numerous consultations, interviews, and discussions about a satisfactory policy, include: arrangements to be made between the student, the school authorities, and concerned MSFC employees; management of the work assignments; and procedures for the student's welfare and safety. The second task was the development of a recruitment brochure for the attraction of new employees, especially scientists and engineers. The third task assigned was to develop a plan called Orientation of New Employees.

  13. Task shifting for the delivery of pediatric antiretroviral treatment: a systematic review.

    PubMed

    Penazzato, Martina; Davies, Mary-Ann; Apollo, Tsitsi; Negussie, Eyerusalem; Ford, Nathan

    2014-04-01

    Pediatric antiretroviral treatment coverage in resource-limited settings continues to lag behind adults. Task shifting is an effective approach broadly used for adults, which some countries have also adopted for children, but implementation is limited by lack of confidence and skills among nonspecialist staff. A systematic review was conducted by combining key terms for task shifting, antiretroviral therapy (ART), and children. Five databases and two conferences were searched from inception till August 01, 2013. Eight observational studies provided outcome data for 11,828 children who received ART from nonphysician providers across 10 countries in sub-Saharan Africa. The cumulative pooled proportion of deaths was 3.2% [95% confidence interval (CI): 2.0 to 4.5] at 6 months, 4.6% (95% CI: 2.1 to 7.1) at 12 months, 6.2% (95% CI: 3.7 to 8.8) at 24 months, and 5.9% (95% CI: 3.5 to 8.3) at 36 months. Mortality and loss to follow-up in task-shifting programs were comparable to those reported by programs providing doctor- or specialist-led care. Our review suggests that task shifting of ART care can result in outcomes comparable to routine physician care, and this approach should be considered as part of a strategy to scale-up pediatric treatment. Specialist care will remain important for management of sick patients and complicated cases. Further qualitative research is needed to inform optimal implementation of task shifting for pediatric patients.

  14. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2011-01-14

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library Of Congress...Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ) contract for the Deepwater...Deepwater assets. The Coast Guard’s own management policies are generally aligned with DHS directives, although operational testing policies are still

  15. DOD Methodology for the Valuation of Excess, Obsolete, and Unserviceable Inventory and Operating Materials and Supplies

    DTIC Science & Technology

    2010-03-25

    PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES...AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER( S ) 12. DISTRIBUTION/AVAILABILITY STATEMENT...Unserviceable FMR Financial Management Regulation OM& S Operating Materials and Supplies SFFAS Statement of Federal Financial Accounting Standards

  16. Materials processing in space programs tasks. [NASA research tasks

    NASA Technical Reports Server (NTRS)

    Pentecost, E.

    1981-01-01

    Active research tasks as of the end of fiscal year 1981 of the materials processing in space program, NASA Office of Space and Terrestrial Applications are summarized to provide an overview of the program scope for managers and scientists in industry, university, and government communities. The program, its history, strategy, and overall goal are described the organizational structures and people involved are identified and a list of recent publications is given for each research task. Four categories: Crystal Growth; Solidification of Metals, Alloys, and Composites; Fluids, Transports, and Chemical Processes, and Ultrahigh Vacuum and Containerless Processing Technologies are used to group the tasks. Some tasks are placed in more than one category to insure complete coverage of each category.

  17. Implementing case management in New York State's partnerships for publicly funded breast cancer screening.

    PubMed

    Lillquist, Patricia P

    2008-04-01

    This research aimed to explore differences in the implementation of case management among local breast cancer screening partnerships in New York State after changes in federal public policy in 1998 and to achieve a better understanding of case management in a new and distinct practice setting. Capacity and willingness to implement change were theorized to explain local differences in implementation. Local breast cancer screening programs that received federal funding through the New York State Department of Health were invited to participate in the study. A mail survey was administered to the directors of New York's 53 local breast cancer screening partnerships in 2003. The survey included questions about willingness and capacity to implement case management and a scale to assess case management program philosophy. Factor analysis and correlations were used to compare willingness and capacity with differences in implementation. Two common factors--task focus and self-identity focus--were identified as factors that differentiated case management programs. Task-focus partnerships undertook a broader range of tasks but were less likely to report autonomy in making program changes. Self-identity partnerships were less likely to report difficulties with other agencies and scored highly on innovation, involvement in work, and interest in client service. Having a nurse as the case manager, being aware of the standards of case management, and providing health education were associated with both task focus and self-identity focus. The study identified distinct styles of implementation. These styles have implications for the breadth of services provided, such as whether client-level services only are offered. Interagency coordination was facilitated in partnerships with comprehensive case management.

  18. Managing Sino-U.S. Air and Naval Interactions: Cold War Lessons and New Avenues of Approach (INSS China Strategic Perspectives, Number 5, September 2012)

    DTIC Science & Technology

    2012-09-01

    Avenues of Approach 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...United States is encircling China and seeking to contain its rise. Mutual suspicions and the competitive elements of the relationship have deepened in...in the motivations that sometimes drive the Chinese to selective noncompliance with their provisions. Understanding these motiva - tions requires a

  19. Mechanism to support generic collective communication across a variety of programming models

    DOEpatents

    Almasi, Gheorghe [Ardsley, NY; Dozsa, Gabor [Ardsley, NY; Kumar, Sameer [White Plains, NY

    2011-07-19

    A system and method for supporting collective communications on a plurality of processors that use different parallel programming paradigms, in one aspect, may comprise a schedule defining one or more tasks in a collective operation, an executor that executes the task, a multisend module to perform one or more data transfer functions associated with the tasks, and a connection manager that controls one or more connections and identifies an available connection. The multisend module uses the available connection in performing the one or more data transfer functions. A plurality of processors that use different parallel programming paradigms can use a common implementation of the schedule module, the executor module, the connection manager and the multisend module via a language adaptor specific to a parallel programming paradigm implemented on a processor.

  20. Computer Bits: Child Care Center Management Software Buying Guide Update.

    ERIC Educational Resources Information Center

    Neugebauer, Roger

    1987-01-01

    Compares seven center management programs used for basic financial and data management tasks such as accounting, payroll and attendance records, and mailing lists. Describes three other specialized programs and gives guidelines for selecting the best software for a particular center. (NH)

  1. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  2. Bibliographies without Tears: Bibliography-Managers Round-Up.

    ERIC Educational Resources Information Center

    Science Software Quarterly, 1984

    1984-01-01

    Reviews and compares "Sci-Mate,""Reference Manager," and "BIBLIOPHILE" software packages used for storage and retrieval tasks involving bibliographic data. Each program handles search tasks well; major differences are in the amount of flexibility in customizing the database structure, their import and export…

  3. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2010-10-22

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of...Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery...The Coast Guard’s own management policies are generally aligned with DHS directives, although operational testing policies are still being revised

  4. Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2010-09-29

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of...the role to Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was...of individual Deepwater assets. The Coast Guard’s own management policies are generally aligned with DHS directives, although operational testing

  5. STUDY OF MANAGEMENT EDUCATION AND TRAINING WITHIN THE DEPARTMENT OF DEFENSE. PART V: SHORT LOGISTICS COURSES TASK GROUP REPORT,

    DTIC Science & Technology

    are under consideration by other task groups. These courses were examined in considerable depth. The schools are the Army Logistics Management Center...is still small. There is no comprehensive system to determine the needs for training and to insure that the total program of logistics management education

  6. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  7. Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

  8. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    NASA Technical Reports Server (NTRS)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  9. Materials processing in space program tasks-supplement

    NASA Technical Reports Server (NTRS)

    Pentecost, E. (Compiler)

    1983-01-01

    An overview of the program scope for managers and scientists in industry, university, and government communities is provided. An introductory description of the program, its history, strategy, and overall goals; identification of the organizational structures and people involved; and a description of each research task, together with a list of recent publications are included. The tasks are grouped into six categories: crystal growth; solidification of metals, alloys, and composites; fluids, transports, and chemical processes; and ultrahigh vacuum and containerless processing technologies; combustion experiments; and experimental technology.

  10. Algorithm Design of CPCI Backboard's Interrupts Management Based on VxWorks' Multi-Tasks

    NASA Astrophysics Data System (ADS)

    Cheng, Jingyuan; An, Qi; Yang, Junfeng

    2006-09-01

    This paper begins with a brief introduction of the embedded real-time operating system VxWorks and CompactPCI standard, then gives the programming interfaces of Peripheral Controller Interface (PCI) configuring, interrupts handling and multi-tasks programming interface under VxWorks, and then emphasis is placed on the software frameworks of CPCI interrupt management based on multi-tasks. This method is sound in design and easy to adapt, ensures that all possible interrupts are handled in time, which makes it suitable for data acquisition systems with multi-channels, a high data rate, and hard real-time high energy physics.

  11. Enhancements to the Design Manager's Aide for Intelligent Decomposition (DeMAID)

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; Barthelemy, Jean-Francois M.

    1992-01-01

    This paper discusses the addition of two new enhancements to the program Design Manager's Aide for Intelligent Decomposition (DeMAID). DeMAID is a knowledge-based tool used to aid a design manager in understanding the interactions among the tasks of a complex design problem. This is done by ordering the tasks to minimize feedback, determining the participating subsystems, and displaying them in an easily understood format. The two new enhancements include (1) rules for ordering a complex assembly process and (2) rules for determining which analysis tasks must be re-executed to compute the output of one task based on a change in input to that or another task.

  12. Enhancements to the Design Manager's Aide for Intelligent Decomposition (DeMaid)

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; Barthelemy, Jean-Francois M.

    1992-01-01

    This paper discusses the addition of two new enhancements to the program Design Manager's Aide for Intelligent Decomposition (DeMAID). DeMAID is a knowledge-based tool used to aid a design manager in understanding the interactions among the tasks of a complex design problem. This is done by ordering the tasks to minimize feedback, determining the participating subsystems, and displaying them in an easily understood format. The two new enhancements include (1) rules for ordering a complex assembly process and (2) rules for determining which analysis tasks must be re-executed to compute the output of one task based on a change in input to that or another task.

  13. Still Not Enough Time in the Day: Media Specialists, Program Planning and Time Management, Part II

    ERIC Educational Resources Information Center

    Fitzgerald, Mary Ann; Waldrip, Andrea

    2004-01-01

    The ways in which one can keep the library media plan on track in the face of the realistic challenges faced by media are discussed. A system for prioritizing tasks, both planned goal-related tasks and tasks that walk in the door in varying degrees of emergency status and by need of more time management strategies could be used. [For Part I, see…

  14. Needs assessment final report

    NASA Technical Reports Server (NTRS)

    Sepulveda, Jose A.

    1992-01-01

    The stated purposes of the Management Science Faculty Fellowship Project were to: (1) provide a comprehensive analysis of KSC management training for engineers and other management professionals from project/program lead through executive levels; and (2) development of evaluation methodologies which can be used to perform ongoing program-wide course-to-course assessments. This report will focus primarily in the first stated purpose for the project. Ideally, the analysis of KSC management training will build in the current system and efficiently propose improvements to achieve existing goals and objectives while helping to identify new visions and new outcomes for the Center's Management Training Mission. Section 2 describes the objectives, approach, and specific tasks used to analyze KSC's Management training System. Section 3 discusses the main conclusions derived from an analysis of the available training data. Section 4 discusses the characteristics and benefits envisioned for a Management Training System. Section 5 proposes a Training System as identified by the results of a Needs Assessment exercise conducted at KSC this summer. Section 6 presents a number of recommendations for future work.

  15. Fleet/TYCOM Level Survey of Armament Handling Problems - Task One of the Naval Aviation Armament Support Equipment Program Management Study

    DTIC Science & Technology

    1977-06-21

    7. AUTHOR(#) 6. CONTRACT OR GRANT NUMBER(#) PILA /UDERIAN 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK...mechanically complex (i.e. contains an internal combustion engine) and/or comes in direct support of the aircraft is managed and maintained by the AIMD. The...an internal combustion engine. Accordingly, only the Aero 33D/E Trailer, Aero 51B Trailer, 21A/C Bomb Skid, and Aero 47A Weapons Loader are maintained

  16. Space station common module power system network topology and hardware development

    NASA Technical Reports Server (NTRS)

    Landis, D. M.

    1985-01-01

    Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.

  17. Quality management and the work environment: an empirical investigation in a public sector organization.

    PubMed

    Taveira, Alvaro D; James, Craig A; Karsh, Ben -Tzion; Sainfort, François

    2003-07-01

    The integration of quality management initiatives, particularly total quality management (TQM), and ergonomics has received increasing attention from scholars and practitioners. Above all, the question of how TQM programs relate to ergonomic aspects of organizational design and culture is at the center of this discussion. This study examines how elements of a "typical", Deming-inspired, TQM program in the public sector interact with the work environment. Elements of the TQM program were defined and measured using the Malcom Baldridge Award criteria. The specific elements examined were "Management Support of Quality", "Information and Analysis", "Human Resources", "Processes and Quality Results", and "Customer Focus and Satisfaction". The relationship between these TQM elements and the work environment were defined through five separate hypotheses. The work environment was described by the constructs "Supervisor Support", "Task Clarity", "Task Orientation", and "Innovation". Data were obtained through survey questionnaires administered to employees of four departments in a municipal government organization. Results supported three of the hypotheses, but produced some unanticipated outcomes with regard to the other two. Namely, "Management Support of Quality" was significantly related to "Supervisor Support", "Task Orientation", "Task Clarity" and "Innovation"; "Human Resources" was significantly related to "Supervisor Support"; "Processes and Quality Results" was significantly related to "Task Orientation" and "Innovation". Contrary to predicted "Information and Analysis" was negatively related to "Innovation", and "Customer Focus" was unrelated to any of the outcome variables. The relationships between these TQM elements and work environment dimensions are discussed. Implications for TQM and ergonomic practice are analyzed, and directions for future research proposed.

  18. Agricultural Occupations. Education for Employment Task Lists.

    ERIC Educational Resources Information Center

    Lake County Area Vocational Center, Grayslake, IL.

    The duties and tasks found in these task lists form the basis of instructional content for secondary, postsecondary, and adult occupational training programs for agricultural occupations. The agricultural occupations are divided into three clusters. The clusters and occupations are: agricultural business and management cluster…

  19. Information Sharing between the U.S. Department State and the U.S. Army: Using Knowledge Management Technology and Tools to Bridge the Gap

    DTIC Science & Technology

    2015-06-12

    PERSON a. REPORT b. ABSTRACT c. THIS PAGE 19b. PHONE NUMBER (include area code) (U) (U) (U) (U) 88 Standard Form 298 (Rev. 8-98) Prescribed by...with a collection of information if it does not display a currently valid OMB control number . PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1...CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) MAJ Andrew V. Walsh 5d. PROJECT NUMBER 5e. TASK NUMBER 5f

  20. Task Description Language

    NASA Technical Reports Server (NTRS)

    Simmons, Reid; Apfelbaum, David

    2005-01-01

    Task Description Language (TDL) is an extension of the C++ programming language that enables programmers to quickly and easily write complex, concurrent computer programs for controlling real-time autonomous systems, including robots and spacecraft. TDL is based on earlier work (circa 1984 through 1989) on the Task Control Architecture (TCA). TDL provides syntactic support for hierarchical task-level control functions, including task decomposition, synchronization, execution monitoring, and exception handling. A Java-language-based compiler transforms TDL programs into pure C++ code that includes calls to a platform-independent task-control-management (TCM) library. TDL has been used to control and coordinate multiple heterogeneous robots in projects sponsored by NASA and the Defense Advanced Research Projects Agency (DARPA). It has also been used in Brazil to control an autonomous airship and in Canada to control a robotic manipulator.

  1. Self Managing the Consequences of Major Limb Trauma

    DTIC Science & Technology

    2011-08-01

    Nathan M. Parmer, Psy.D. 5e. TASK NUMBER E -Mail: emackenz@jhsph.edu 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...individual’s lesson activity. This area includes the ‘Member Lounge ’, which is an open virtual chat space where all users from any cohort or class can...current lesson, and allows the program administrator to send e -mail reminders when users fall behind on the sessions. The LMS is integrated to the

  2. Methods and principles for determining task dependent interface content

    NASA Technical Reports Server (NTRS)

    Shalin, Valerie L.; Geddes, Norman D.; Mikesell, Brian G.

    1992-01-01

    Computer generated information displays provide a promising technology for offsetting the increasing complexity of the National Airspace System. To realize this promise, however, we must extend and adapt the domain-dependent knowledge that informally guides the design of traditional dedicated displays. In our view, the successful exploitation of computer generated displays revolves around the idea of information management, that is, the identification, organization, and presentation of relevant and timely information in a complex task environment. The program of research that is described leads to methods and principles for information management in the domain of commercial aviation. The multi-year objective of the proposed program of research is to develop methods and principles for determining task dependent interface content.

  3. Microgravity science and applications program tasks, 1991 revision

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Presented here is a compilation of the active research tasks for FY 1991 sponsored by the Microgravity Science and Applications Division of the NASA Office of Space Science and Applications. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. Included is an introductory description of the program, the strategy and overall goal, identification of the organizational structures and the people involved, and a description of each. The tasks are grouped into several categories: electronic materials; solidification of metals, alloys, and composites; fluids, interfaces, and transport; biotechnology; combustion science; glasses and ceramics; experimental technology, instrumentation, and facilities; and Physical and Chemistry Experiments (PACE). The tasks cover both the ground based and flight programs.

  4. Integrated corridor management, concept development and foundational research. Task 5.5, identification of analysis needs.

    DOT National Transportation Integrated Search

    2006-08-28

    Task 5 - Identify Corridor Types, Operational Approaches and Strategies, and Analysis Tools - is part of the overall foundational research to further the understanding of various aspects of Integrated Corridor Management (ICM) and to identify integra...

  5. 78 FR 34313 - Funding Opportunity Title: Risk Management Education Partnerships Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... Involvement H. Description of Agreement Award--Awardee Tasks I. Other Tasks Section III--Eligibility..., ornamental nursery, Christmas trees, turf grass sod, aquaculture (including ornamental fish), and industrial.... H. Description of Agreement Award--Awardee Tasks In conducting activities to achieve the purpose and...

  6. Managing the space sciences

    NASA Technical Reports Server (NTRS)

    1995-01-01

    In April 1994 the National Research Council received a request from NASA that the NRC's Space Studies Board provide guidance on questions relating to the management of NASA's programs in the space sciences. The issues raised in the request closely reflect questions posed in the agency's fiscal year 1994 Senate appropriations report. These questions included the following: Should all the NASA space science programs be gathered into a 'National Institute for Space Science'? What other organizational changes might be made to improve the coordination and oversight of NASA space science programs? What processes should be used for establishing interdisciplinary science priorities based on scientific merit and other criteria, while ensuring opportunities for newer fields and disciplines to emerge? And what steps could be taken to improve utilization of advanced technologies in future space scienc missions? This report details the findings of the Committee on the Future of Space Science (FOSS) and its three task groups: the Task Group on Alternative Organizations, Task Group on Research Prioritization, and the Task Group on Technology.

  7. Space station operations task force. Panel 4 report: Management integration

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  8. SUMO: operation and maintenance management web tool for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa

    2014-08-01

    SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.

  9. An enhanced Ada run-time system for real-time embedded processors

    NASA Technical Reports Server (NTRS)

    Sims, J. T.

    1991-01-01

    An enhanced Ada run-time system has been developed to support real-time embedded processor applications. The primary focus of this development effort has been on the tasking system and the memory management facilities of the run-time system. The tasking system has been extended to support efficient and precise periodic task execution as required for control applications. Event-driven task execution providing a means of task-asynchronous control and communication among Ada tasks is supported in this system. Inter-task control is even provided among tasks distributed on separate physical processors. The memory management system has been enhanced to provide object allocation and protected access support for memory shared between disjoint processors, each of which is executing a distinct Ada program.

  10. X-Windows Socket Widget Class

    NASA Technical Reports Server (NTRS)

    Barry, Matthew R.

    2006-01-01

    The X-Windows Socket Widget Class ("Class" is used here in the object-oriented-programming sense of the word) was devised to simplify the task of implementing network connections for graphical-user-interface (GUI) computer programs. UNIX Transmission Control Protocol/Internet Protocol (TCP/IP) socket programming libraries require many method calls to configure, operate, and destroy sockets. Most X Windows GUI programs use widget sets or toolkits to facilitate management of complex objects. The widget standards facilitate construction of toolkits and application programs. The X-Windows Socket Widget Class encapsulates UNIX TCP/IP socket-management tasks within the framework of an X Windows widget. Using the widget framework, X Windows GUI programs can treat one or more network socket instances in the same manner as that of other graphical widgets, making it easier to program sockets. Wrapping ISP socket programming libraries inside a widget framework enables a programmer to treat a network interface as though it were a GUI.

  11. Purchasing and Accounting. MAS-116. Waste Isolation Division (WID). Management and Supervisor Training (MAST) Program.

    ERIC Educational Resources Information Center

    Westinghouse Electric Corp., Carlsbad, NM.

    This learning module, which is part of a management and supervisor training program for managers and supervisors employed at the Department of Energy's Waste Isolation Division, is designed to prepare trainees to perform purchasing and accounting tasks efficiently and effectively. The first section is an introduction to the module. The next three…

  12. Nano-Zirconium Tungstate Reinforced Liquid Crystalline Thermosetting Composites with Near Zero Thermal Expansion

    DTIC Science & Technology

    2015-06-25

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Washington State University, Pullman...1234. 5c. PROGRAM ELEMENT NUMBER. Enter all program element numbers as they appear in the report, e.g. 61101A. 5d. PROJECT NUMBER. Enter all... project numbers as they appear in the report, e.g. 1F665702D1257; ILIR. 5e. TASK NUMBER. Enter all task numbers as they appear in the report

  13. Remote sensing in Michigan for land resource management

    NASA Technical Reports Server (NTRS)

    Sattinger, I. J.; Sellman, A. N.; Istvan, L. B.; Cook, J. J.

    1973-01-01

    During the period from June 1972 to June 1973, remote sensing techniques were applied to the following tasks: (1) mapping Michigan's land resources, (2) waterfowl habitat management at Point Mouillee, (3) mapping of Lake Erie shoreline flooding, (4) highway impact assessment, (5) applications of the Earth Resources Technology Satellite, ERTS-1, (6) investigation of natural gas eruptions near Williamsburg, and (7) commercial site selection. The goal of the program was the large scale adaption, by both public agencies and private interests in Michigan, of earth-resource survey technology as an important aid in the solution of current problems in resources management and environmental protection.

  14. A College Marketing Plan That's Working: Final Report. CASE Certification Program in Executive Management.

    ERIC Educational Resources Information Center

    Noll, Gayle

    In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…

  15. Organizational and operational models for certificate management entities as part of the connected vehicle program : revised working paper (task 2).

    DOT National Transportation Integrated Search

    1997-01-01

    This report summarizes the efforts performed under subtasks D&E of the ATIS Communications Technology Alternatives Task for the FHWA Turner Fairbank Highway Research Center. Tasks D & E were to facilitate further examination of wireless communication...

  16. Microgravity Science and Application Program tasks, 1989 revision

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The active research tasks, as of the fiscal year 1989, of the Microgravity Science and Applications Program, NASA Office of Space Science and Applications, involving several NASA Centers and other organizations are compiled. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. The scientists in industry, university, and government communities. An introductory description of the program, the strategy and overall goal, identification of the organizational structures and people involved, and a description of each task are included. Also provided is a list of recent publications. The tasks are grouped into several major categories: electronic materials, solidification of metals, alloys, and composites; fluids, interfaces, and transport; biotechnology; glasses and ceramics; combustion science; physical and chemistry experiments (PACE); and experimental technology, facilities, and instrumentation.

  17. 17 CFR 200.17 - Chief Management Analyst.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management General Organization... Officer for overseeing the performance of management analysis tasks which pertain, but are not limited, to... utilization; (c) Organizational structures and delegations of authority; (d) Management information systems...

  18. Microgravity Science and Applications Program tasks, 1987 revision

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A compilation is presented of the active research tasks as of the end of the FY87 of the Microgravity Science and Applications Program, NASA-Office of Space Science and Applications, involving several NASA centers and other organizations. An overview is provided of the program scope for managers and scientists in industry, university, and government communities. An introductory description is provided of the program along with the strategy and overall goal, identification of the organizational structures and people involved, and a description of each task. A list of recent publications is also provided. The tasks are grouped into six major categories: Electronic Materials; Solidification of Metals, Alloys, and Composites; Fluid Dynamics and Transport Phenomena; Biotechnology; Glasses and Ceramics; and Combustion. Other categories include Experimental Technology, General Studies and Surveys; Foreign Government Affiliations; Industrial Affiliations; and Physics and Chemistry Experiments (PACE). The tasks are divided into ground based and flight experiments.

  19. Microgravity Science and Applications Program tasks, 1988 revision

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The active research tasks as of the end of the fiscal year 1988 of the Microgravity Science and Applications Program, NASA-Office of Space Science and Applications, involving several NASA centers and other organizations are compiled. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. Also included are an introductory description of the program, the strategy and overall goal, identification of the organizational structures and people involved, and a description of each task. A list of recent publications is provided. The tasks are grouped into six major categories: electronic materials; solidification of metals, alloys, and composites; fluid dynamics and transport phenomena; biotechnology; glasses and ceramics; and combustion. Other categories include experimental technology, general studies and surveys; foreign government affiliations; industrial affiliations; and Physics And Chemistry Experiments (PACE). The tasks are divided into ground-based and flight experiments.

  20. Management of the aging of critical safety-related concrete structures in light-water reactor plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naus, D.J.; Oland, C.B.; Arndt, E.G.

    1990-01-01

    The Structural Aging Program has the overall objective of providing the USNRC with an improved basis for evaluating nuclear power plant safety-related structures for continued service. The program consists of a management task and three technical tasks: materials property data base, structural component assessment/repair technology, and quantitative methodology for continued-service determinations. Objectives, accomplishments, and planned activities under each of these tasks are presented. Major program accomplishments include development of a materials property data base for structural materials as well as an aging assessment methodology for concrete structures in nuclear power plants. Furthermore, a review and assessment of inservice inspection techniquesmore » for concrete materials and structures has been complete, and work on development of a methodology which can be used for performing current as well as reliability-based future condition assessment of concrete structures is well under way. 43 refs., 3 tabs.« less

  1. Microgravity Science and Applications Program tasks, 1990 revision

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The active research tasks as of the end of the fiscal year 1990 sponsored by the Microgravity Science and Applications Division of the NASA Office of Space Science and Applications are compiled. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. The report includes an introductory description of the program, the strategy and overall goal; an index of principle investigators; and a description of each task. A list of recent publications is also provided. The tasks are grouped into six major categories: electronic materials; solidification of metals, alloys, and composites; fluid dynamics and transport phenomena; biotechnology; glasses and ceramics; combustion; experimental technology; facilities; and Physics And Chemistry Experiments (PACE). The tasks are divided into ground-based and flight experiments.

  2. Brief Report: Reduction of Inappropriate Vocalizations for a Child with Autism Using a Self-Management Treatment Program.

    ERIC Educational Resources Information Center

    Mancina, Catherine; Tankersley, Melody; Kamps, Debra; Kravits, Tammy; Parrett, Jean

    2000-01-01

    A study examined the effects of a self-management program used to reduce high rates of inappropriate vocalizations (e.g., humming, tongue clucking, perseveration, and echolalic words/phases) in a 12-year-old girl with autism. When self-management was applied to inappropriate vocalizations during leisure, prevocational, and reading tasks, the…

  3. Sediment Management Methods to Reduce Dredging: Part 2, Sediment Collector Technology

    DTIC Science & Technology

    2017-04-01

    Approved for public release; distribution is unlimited. ERDC TN-DOER-T13 April 2017 Sediment Management Methods to Reduce Dredging: Part 2...DOER) Program technical note (TN) is the second in a series evaluating sediment management methods to reduce dredging through a research task (RT...in the DOER Program.1 This TN presents an evaluation of sediment collector technology, one promising new device that may help better manage

  4. Extension Master Gardener Intranet: Automating Administration, Motivating Volunteers, Increasing Efficiency, and Facilitating Impact Reporting

    ERIC Educational Resources Information Center

    Bradley, Lucy K.; Cook, Jonneen; Cook, Chris

    2011-01-01

    North Carolina State University has incorporated many aspects of volunteer program administration and reporting into an on-line solution that integrates impact reporting into daily program management. The Extension Master Gardener Intranet automates many of the administrative tasks associated with volunteer management, increasing efficiency, and…

  5. Computer software management, evaluation, and dissemination

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The activities of the Computer Software Management and Information Center involving the collection, processing, and distribution of software developed under the auspices of NASA and certain other federal agencies are reported. Program checkout and evaluation, inventory control, customer services and marketing, dissemination, program maintenance, and special development tasks are discussed.

  6. Coherence between harvest and habitat management -- Joint venture perspectives

    USGS Publications Warehouse

    Baxter, C.K.; Nelson, J.W.; Reinecke, K.J.; Stephens, S.E.

    2006-01-01

    Introduction: In recent months, an ad hoc group of waterfowl scientists, representing the International Association of Fish and Wildlife Agencies (IAFWA) Adaptive Harvest Management (ARM) Task Force and the North American Waterfowl Management Plan (NAWMP) Committee, have collaborated as a Joint Task Group (JTG) to assess options for unifying the population goals guiding waterfowl harvest management and habitat management. The JTG has been charged with bringing coherence to the population goals of the two programs. Characterizing the problem as one of coherence indicates value judgments exist regarding its significance or perhaps existence. For purposes of this paper, we characterize the lack of coherence as the absence of consistent population goals in the two related components of waterfowl conservation habitat and harvest management. Our purpose is to support continued dialogue on the respective goals of these programs and the possible implications of discordant goals to habitat joint ventures. Our objectives are two-fold: (1) illustrate how NAWMP habitat management goals and strategies have been interpreted and pursued in both breeding and wintering areas, and (2) provide perspectives on the linkages between regional habitat management programs and harvest management. The Lower Mississippi Valley and the Prairie Pothole joint ventures (LMVJV and PPJV, respectively) will be used as examples.

  7. Skylab

    NASA Image and Video Library

    1972-01-01

    This chart details Skylab's Time and Motion experiment (M151), a medical study to measure performance differences between tasks undertaken on Earth and the same tasks performed by Skylab crew members in orbit. Data collected from this experiment evaluated crew members' zero-gravity behavior for designs and work programs for future space exploration. The Marshall Space Flight Center had program management responsibility for the development of Skylab hardware and experiments.

  8. Managing Conflict in Temporary Management Systems

    ERIC Educational Resources Information Center

    Wilemon, David L.

    1973-01-01

    As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…

  9. The Folly of Consequence-free Budget Scoring

    DTIC Science & Technology

    2007-04-30

    çÑ=íÜÉ= clroqe=^ååì~ä=^Åèìáëáíáçå= oÉëÉ~êÅÜ=póãéçëáìã== qÜìêëÇ~ó=ëÉëëáçåë= The Folly of Consequence -free Budget Scoring Published: 30 April 2007... Consequence -free Budget Scoring 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...Folly of Consequence -free Budget Scoring Presenter: Gerald S. Koenig is Managing Director of Hannon Armstrong Advisory Services, a firm that advises

  10. Materials processing in space program tasks

    NASA Technical Reports Server (NTRS)

    Pentecost, E. (Compiler)

    1982-01-01

    Active research areas as of the end of the fiscal year 1982 of the Materials Processing in Space Program, NASA-Office of Space and Terrestrial Applications, involving several NASA centers and other organizations are highlighted to provide an overview of the program scope for managers and scientists in industry, university, and government communities. The program is described as well as its history, strategy and overall goal; the organizational structures and people involved are identified and each research task is described together with a list of recent publications. The tasks are grouped into four categories: crystal growth; solidification of metals, alloys, and composites; fluids, transports, and chemical processes; and ultrahigh vacuum and containerless processing technologies.

  11. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 1. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-06-01

    The conceptual design of an advanced central receiver power system using liquid sodium as a heat transport medium has been completed by a team consisting of the Energy Systems Group (prime contractor), McDonnell Douglas, Stearns-Roger, The University of Houston, and Salt River Project. The purpose of this study was to determine the technical and economic advantages of this concept for commercial-scale power plants. This final report covers all tasks of the project. These tasks were as follows: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) select commercial configuration; (4) commercial plant conceptual design; (5) assessment of commercialmore » plant; (6) advanced central receiver power system development plan; (7) program plan; (8) reports and data; (9) program management; and (10) safety analysis. A programmatic overview of the accomplishments of this program is given. The 100-MW conceptual commercial plant, the 281-MW optimum plant, and the 10-MW pilot plant are described. (WHK)« less

  12. Controller resource management : what can we learn from aircrews?

    DOT National Transportation Integrated Search

    1995-07-01

    This paper provides an overview of the scientific literature regarding Crew Resource Management (CRM). It responds to tasking from the Office of Air Traffic Program Management to conduct studies addressing the application of team training models such...

  13. Expert Systems in Contract Management. A Pilot Study.

    DTIC Science & Technology

    1985-10-01

    and appropriately selected .1 ~..they can provide valuable assistance to managers in their tasks of planning and control. If these techniques are to ...the programs that would affect their relevance -> . to construction management applications in general. We also ascertained which programs have... further experience of SAVOIR applied in a fairly complex real-world domain This has, in their view, confirmed the suitability of SAVOIR for the domain

  14. Derailing Intragroup Management Conflict.

    ERIC Educational Resources Information Center

    Bonar, John; Vaughn, Glen

    1994-01-01

    Discussion of management conflict highlights differing job perceptions held by middle managers. The Malcolm Baldrige National Quality Assessment Program is described, and a management structure that requires members of each group to experience job perceptions and tasks of the other group is recommended for performance improvement. (Contains three…

  15. GPHS-RTGs in support of the Cassini mission

    NASA Astrophysics Data System (ADS)

    1994-04-01

    This report is organized by the program task structure as follows: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple fabrication; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance and reliability, contract changes, noncapital contractor acquired government owned property (CAGO) acquisition, and CAGO maintenance; and (10) CAGO acquisition.

  16. Care management program evaluation: constituents, conflicts, and moves toward standardization.

    PubMed

    Long, D Adam; Perry, Theodore L; Pelletier, Kenneth R; Lehman, Gregg O

    2006-06-01

    Care management program evaluations bring together constituents from finance, medicine, and social sciences. The differing assumptions and scientific philosophies that these constituents bring to the task often lead to frustrations and even contentions. Given the forms and variations of care management programs, the difficulty associated with program outcomes measurement should not be surprising. It is no wonder then that methods for clinical and economic evaluations of program efficacy continue to be debated and have yet to be standardized. We describe these somewhat hidden processes, examine where the industry stands, and provide recommendations for steps to standardize evaluation methodology.

  17. Software Project Management

    DTIC Science & Technology

    1989-07-01

    incorporated into the sys- Kotler88 tem. Several interesting concepts are presented, but Kotler , P. Marketing Planning: Analysis, Planning, the bulk of the...Metzger87 Mantei, M. "The Effect of Programming Team Metzger, Philip W. Managing Programming Structures on Programming Tasks." Comm. ACM People: A Personal... Philips . Software Engi- Classic approach in organization theory. neering. Englewood Cliffs, N.J.: Prentice-Hall, 1988. Shannon75 An industrial approach

  18. Traffic management centers : the state-of-the-practice : task A : final working paper for design of support systems for advanced traffic management systems

    DOT National Transportation Integrated Search

    1999-02-01

    The goal of the Federal Highway Administration (FHWA) Expert Systems for Crash Data Collection Program was to use expert system technology to improve the accuracy and consistency of police-reported data. The program included the development and evalu...

  19. NASIS data base management system: IBM 360 TSS implementation. Volume 1: Installation standards

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The installation standards for the (NASIS) data base management system are presented. The standard approach to preparing systems documentation and the program design and coding rules and conventions are outlines. Included are instructions for preparing all major specifications and suggestions for improving the quality and efficency of the programming task.

  20. The Admissions Profession: A Guide for Staff Development and Program Management.

    ERIC Educational Resources Information Center

    American Association of Collegiate Registrars and Admissions Officers, Washington, DC.

    This guide is designed to assist in college admissions staff development and program management, but is also suggested for use in training and accrediting efforts, presentations on admissions tasks, internal or external evaluations, preparation of periodic reports, and as a self-paced workbook when preparing for the admission profession, or for…

  1. Risk Management: Earning Recognition with an Automated Safety Program

    ERIC Educational Resources Information Center

    Lansberry, Linden; Strasburger, Tom

    2012-01-01

    Risk management is a huge task that requires diligent oversight to avoid penalties, fines, or lawsuits. Add in the burden of limited resources that schools face today, and the challenge of meeting the required training, reporting, compliance, and other administrative issues associated with a safety program is almost insurmountable. Despite an…

  2. Making it local: Beacon Communities use health information technology to optimize care management.

    PubMed

    Allen, Amy; Des Jardins, Terrisca R; Heider, Arvela; Kanger, Chatrian R; Lobach, David F; McWilliams, Lee; Polello, Jennifer M; Rein, Alison L; Schachter, Abigail A; Singh, Ranjit; Sorondo, Barbara; Tulikangas, Megan C; Turske, Scott A

    2014-06-01

    Care management aims to provide cost-effective, coordinated, non-duplicative care to improve care quality, population health, and reduce costs. The 17 communities receiving funding from the Office of the National Coordinator for Health Information Technology through the Beacon Community Cooperative Agreement Program are leaders in building and strengthening their health information technology (health IT) infrastructure to provide more effective and efficient care management. This article profiles 6 Beacon Communities' health IT-enabled care management programs, highlighting the influence of local context on program strategy and design, and describing challenges, lessons learned, and policy implications for care delivery and payment reform. The unique needs (eg, disease burden, demographics), community partnerships, and existing resources and infrastructure all exerted significant influence on the overall priorities and design of each community's care management program. Though each Beacon Community needed to engage in a similar set of care management tasks--including patient identification, stratification, and prioritization; intervention; patient engagement; and evaluation--the contextual factors helped shape the specific strategies and tools used to carry out these tasks and achieve their objectives. Although providers across the country are striving to deliver standardized, high-quality care, the diverse contexts in which this care is delivered significantly influence the priorities, strategies, and design of community-based care management interventions. Gaps and challenges in implementing effective community-based care management programs include: optimizing allocation of care management services; lack of available technology tailored to care management needs; lack of standards and interoperability; integrating care management into care settings; evaluating impact; and funding and sustainability.

  3. Ada and software management in NASA: Assessment and recommendations

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Recent NASA missions have required software systems that are larger, more complex, and more critical than NASA software systems of the past. The Ada programming language and the software methods and support environments associated with it are seen as potential breakthroughs in meeting NASA's software requirements. The findings of a study by the Ada and Software Management Assessment Working Group (ASMAWG) are presented. The study was chartered to perform three tasks: (1) assess the agency's ongoing and planned Ada activities; (2) assess the infrastructure (standards, policies, and internal organizations) supporting software management and the Ada activities; and (3) present an Ada implementation and use strategy appropriate for NASA over the next 5 years.

  4. Skylab

    NASA Image and Video Library

    1970-01-01

    This 1970 photograph shows Skylab's Time and Motion experiment (M151) control unit, a medical study to measure performance differences between tasks undertaken on Earth and the same tasks performed by Skylab crew members in orbit. Data collected from this experiment evaluated crew members' zero-gravity behavior for designs and work programs for future space exploration. The Marshall Space Flight Center had program management responsibility for the development of Skylab hardware and experiments.

  5. Advancing the practice of systems engineering at JPL

    NASA Technical Reports Server (NTRS)

    Jansma, Patti A.; Jones, Ross M.

    2006-01-01

    In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.

  6. Who Will Manage the Schools?

    ERIC Educational Resources Information Center

    Clinton, Bill

    1986-01-01

    The Governors' Task Force on Leadership and Management created an action agenda to develop policies that strengthen school leadership, encourage school renewal, and determine broad educational goals. Suggested improvements include provision of proper training and certification programs for principals, effective inservice management development…

  7. Extended System Operations Studies for Automated Guideway Transit Systems : Plan for Task 5--DPM Failure Management

    DOT National Transportation Integrated Search

    1981-06-01

    The purpose of Task 5 in the Extended System Operations Studies Project, DPM Failure Management, is to enhance the capabilities of the Downtown People Mover Simulation (DPMS) and the Discrete Event Simulation Model (DESM) by increasing the failure mo...

  8. Computer multitasking with Desqview 386 in a family practice.

    PubMed Central

    Davis, A E

    1990-01-01

    Computers are now widely used in medical practice for accounting and secretarial tasks. However, it has been much more difficult to use computers in more physician-related activities of daily practice. I investigated the Desqview multitasking system on a 386 computer as a solution to this problem. Physician-directed tasks of management of patient charts, retrieval of reference information, word processing, appointment scheduling and office organization were each managed by separate programs. Desqview allowed instantaneous switching back and forth between the various programs. I compared the time and cost savings and the need for physician input between Desqview 386, a 386 computer alone and an older, XT computer. Desqview significantly simplified the use of computer programs for medical information management and minimized the necessity for physician intervention. The time saved was 15 minutes per day; the costs saved were estimated to be $5000 annually. PMID:2383848

  9. Development of OTM Syngas Process and Testing of Syngas Derived Ultra-clean Fuels in Diesel Engines and Fuel Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.T.; James P. Meagher; Prasad Apte

    2002-12-31

    This topical report summarizes work accomplished for the Program from November 1, 2001 to December 31, 2002 in the following task areas: Task 1: Materials Development; Task 2: Composite Development; Task 4: Reactor Design and Process Optimization; Task 8: Fuels and Engine Testing; 8.1 International Diesel Engine Program; 8.2 Nuvera Fuel Cell Program; and Task 10: Program Management. Major progress has been made towards developing high temperature, high performance, robust, oxygen transport elements. In addition, a novel reactor design has been proposed that co-produces hydrogen, lowers cost and improves system operability. Fuel and engine testing is progressing well, but wasmore » delayed somewhat due to the hiatus in program funding in 2002. The Nuvera fuel cell portion of the program was completed on schedule and delivered promising results regarding low emission fuels for transportation fuel cells. The evaluation of ultra-clean diesel fuels continues in single cylinder (SCTE) and multiple cylinder (MCTE) test rigs at International Truck and Engine. FT diesel and a BP oxygenate showed significant emissions reductions in comparison to baseline petroleum diesel fuels. Overall through the end of 2002 the program remains under budget, but behind schedule in some areas.« less

  10. Nothing New Under the Sun: Benefiting from the Great Lessons of History to Develop a Coherent Cyberspace Deterrence Strategy

    DTIC Science & Technology

    2012-05-12

    LESSONS OF HISTORY TO DEVELOP A COHERENT CYBERSPACE DETERRENCE STRATEGY 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHDR!SI 5d. PROJECT ...AFOSR-82-1234. 5c. PROGRAM ELEMENT NUMBER. Enter all program element numbers as they appear in the report, e.g. 61101 A. 5d. PROJECT NUMBER...Enter all project numbers as they appear in the report, e.g. 1F665702D1257; ILIR. 5e. TASK NUMBER. Enter all task numbers as they appear in the

  11. Matrix Management in DoD: An Annotated Bibliography

    DTIC Science & Technology

    1984-04-01

    ADDRESS 10 PROGRAM ELEMENT. PROJECT, TASK AREA & WORK UNIT NUMBERS ACSC/EDCC, MAXWELL AFB AL 36112 1 1. CONTROLLING OFFICE NAME AND ADDRESS 12 ...completes their message that matrix orga- nization is the likely format of the multiprogram Program Office. 12 The text’s discussion of matrix is...manager, and functional specialist are of vital importance to the effective operation of the matrix .... Matrix management will not achieve its

  12. Rail Transit System Cost Study

    DOT National Transportation Integrated Search

    1977-01-01

    The Transportation Systems Center serves as Systems Manager for the Rail Supporting Technology Program of the Urban Mass Transportation Administration. One task under this program has been to assess the cost of constructing, operating and maintaining...

  13. Laboratory Waste Management. A Guidebook.

    ERIC Educational Resources Information Center

    American Chemical Society, Washington, DC.

    A primary goal of the American Chemical Society Task Force on Laboratory Waste Management is to provide laboratories with the information necessary to develop effective strategies and training programs for managing laboratory wastes. This book is intended to present a fresh look at waste management from the laboratory perspective, considering both…

  14. Participative management and shared leadership: implementing a model.

    PubMed

    Noonan, D

    1995-01-01

    The author identifies the development, implementation and outcomes of a task subgroup model of management that provides a mechanism for shared leadership, planning, decision making, implementation and evaluation by staff, patients and families on a program level. The conceptual model and its operationalization are outlined within the context of the rehabilitation program at the Providence Centre in Scarborough, Ontario.

  15. Online Attention Training for Older Adults.

    PubMed

    Wennberg, Alexandra; Kueider, Alexandra; Spira, Adam; Adams, Gregory; Rager, Robert; Rebok, George

    Evidence suggests that cognitive training interventions can improve older adults' cognitive performance. Successful training programs are adaptable and train multiple cognitive domains to target individual strengths and weaknesses. Computerized training programs are useful because they allow older adults to easily access training. This pilot study used an online attention training program, ATTENTION WORKOUT™, to enhance three aspects of attention- coordination , allocation , and selective focus -in community-dwelling older adults randomized to either an abbreviated (n=13) or an extended (n=17) practice training program over a 6-week period. Participants in the extended practice group significantly improved on selective focus reading distraction tasks with unrelated words (U=39.5; Z=-2.34; p =.02) and blanks (U=26.5; Z=-3.05; p =.002) as well as a matching attributes task (U=49.5; Z=-2.33; p =.02). The extended practice group significantly improved on three tasks of coordinating attention - radio-tuning (U=30; Z=-2.73; p =.01), circuit-breaker resetting (U=46; Z=-2.24; p =.03), and the combination of the two tasks (U=15; Z=-3.51; p <.0001) - as well as a memory generalization task (U=20; Z=-3.27; p =.001). A post-test satisfaction survey found both groups enjoyed the program, but the abbreviated practice group felt the tasks were more difficult. These findings suggest online attention training programs, like ATTENTION WORKOUT, can improve attention-related skills in community-dwelling older adults.

  16. The Use of a UNIX-Based Workstation in the Information Systems Laboratory

    DTIC Science & Technology

    1989-03-01

    system. The conclusions of the research and the resulting recommendations are presented in Chapter III. These recommendations include how to manage...required to run the program on a new system, these should not be significant changes. 2. Processing Environment The UNIX processing environment is...interactive with multi-tasking and multi-user capabilities. Multi-tasking refers to the fact that many programs can be run concurrently. This capability

  17. Mobilizable RDF/d-RDF burning program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niemann, K.; Campbell, J.

    1982-03-01

    The Mobilizable RDF/d-RDF Burning Program was conceived to promote the utilization of refuse-derived fuels (RDF) as a supplement to existing fossil fuel sources in industrial-sized boilers. The program explores the design, development, and eventual construction of densified-RDF (d-RDF) for use in boiler combustion testing as a supplement to stoker coal or wood wastes. The equipment would be mounted on trailers and assembled and operated at preselected sites throughout the country where approximately 750 tons of RDF would be produced and test burned in a local boiler. The equipment, to include a transportable RDF boiler metering and feed system, would thenmore » be moved and operated at two to three test sites annually. The program is intended to encourage the construction of permanent resource recovery facilities by involving local waste handling groups in operating the equipment and producing fuel, and potential local fuel users in testing the fuel in their boilers. The Mobilizable Program was developed from two separate tasks. The first task developed the concept behind the program and defined its operational and organizational structure. The second task, a follow-up to the first, was intended principally to finalize test locations, develop equipment designs and specifications, and formalize a management program. This report summarizes the principal findings of both tasks. It identifies the criteria used to identify test locations, outlines the program's management structure, presents design and performance specifications for both the fuel production equipment and boiler fuel feed systems, and provides a detailed evaluation of the parameters involved in burning RDF in industrial-sized boilers. Final conclusions and recommendations identify problem areas encountered in the program, and discuss possible future directions for such a program.« less

  18. RDT&E Progress and Plansfor Hexavalent Chromium (Cr6+)

    DTIC Science & Technology

    2011-05-12

    RDT&E Progress and Plans for Hexavalent Chromium (Cr6+) Bruce Sartwell Weapons Systems and Platforms Program Manager E2S2 Conference May 12, 2011...2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE RDT&E Progress and Plansfor Hexavalent Chromium (Cr6+) 5a...Tasks/Projects Surface treatments and soluble inhibitors: 1. Fundamental studies of the Trivalent Chrome Process (TCP) 2. Mechanisms of selected

  19. Agile Task Tracking Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duke, Roger T.; Crump, Thomas Vu

    The work was created to provide a tool for the purpose of improving the management of tasks associated with Agile projects. Agile projects are typically completed in an iterative manner with many short duration tasks being performed as part of iterations. These iterations are generally referred to as sprints. The objective of this work is to create a single tool that enables sprint teams to manage all of their tasks in multiple sprints and automatically produce all standard sprint performance charts with minimum effort. The format of the printed work is designed to mimic a standard Kanban board. The workmore » is developed as a single Excel file with worksheets capable of managing up to five concurrent sprints and up to one hundred tasks. It also includes a summary worksheet providing performance information from all active sprints. There are many commercial project management systems typically designed with features desired by larger organizations with many resources managing multiple programs and projects. The audience for this work is the small organizations and Agile project teams desiring an inexpensive, simple, user-friendly, task management tool. This work uses standard readily available software, Excel, requiring minimum data entry and automatically creating summary charts and performance data. It is formatted to print out and resemble standard flip charts and provide the visuals associated with this type of work.« less

  20. Designing and managing successful endangered species recovery programs

    NASA Astrophysics Data System (ADS)

    Clark, Tim W.; Crete, Ron; Cada, John

    1989-03-01

    Endangered species recovery is characterized by complexity and uncertainty in both its biological and organizational aspects. To improve performance in the organizational dimension, some models of organizations are briefly introduced with an emphasis on the organization as a system for processing information, i.e., for successfully dealing with the high uncertainty in the task environment. A strong task orientation,which rewards achievement of the primary goal, is suggested as ideal for this task, as is generative rationality, which encourages workers to observe, critique, and generate new ideas. The parallel organization—a flexible, participatory, problem-solving structure set up alongside traditional bureaucracies—is offered as a useful structure for meeting the demands of uncertainties encountered during recovery. Task forces and projects teams can be set up as parallel organizations. Improved managerial functions include coordinating roles to facilitate the flow and use of information; decision making to avoid “groupthink”—the defects, symptoms, and countermeasures are described; and productive, active management of the inevitable conflict. The inability of organizations to solve dilemmas, to examine their own structures and management, and to change themselves for more effective, efficient, and equitable performance is seen as the major obstacle to improved recovery programs. Some recommendations for effecting change in bureaucracies are made along with a call for case studies detailing the organizational dimensions of endangered species recovery programs.

  1. Roles of the eye care workforce for task sharing in management of diabetic retinopathy in Cambodia

    PubMed Central

    Shah, Mufarriq; Ormsby, Gail M.; Noor, Ayesha; Chakrabarti, Rahul; Mörchen, Manfred; Islam, Fakir M Amirul; Harper, C Alex; Keeffe, Jill E

    2018-01-01

    AIM To identify the current roles of eye and health care workers in eye care delivery and investigate their potential roles in screening and detection for management of diabetic retinopathy (DR) through task sharing. METHODS Purposive sampling of 24 participants including health administrators, members from non-government organizations and all available eye care workers in Takeo province were recruited. This cross sectional mixed method study comprised a survey and in-depth interviews. Data were collected from medical records at Caritas Takeo Eye Hospital (CTEH) and Kiri Vong District Referral Hospital Vision Centre, and a survey and interviews with participants were done to explore the potential roles for task sharing in DR management. Qualitative data were transcribed into a text program and then entered into N-Vivo (version 10) software for data management and analysis. RESULTS From 2009 to 2012, a total of 105 178 patients were examined and 14 030 eye surgeries were performed in CTEH by three ophthalmologists supported by ophthalmic nurses in operating and eye examination for patients. Between January 2011 and September 2012, 151 patients (72 males) with retinal pathology including 125 (83%) with DR visited CTEH. In addition 170 patients with diabetes were referred to CTEH for eye examinations from Mo Po Tsyo screening programs for people with diabetes. Factors favouring task sharing included high demand for eye care services and scarcity of ophthalmologists. CONCLUSION Task sharing and team work for eye care services is functional. Participants favor the potential role of ophthalmic nurses in screening for DR through task sharing. PMID:29375999

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chu, C.I.C.; Gillespie, B.L.

    One of the most perplexing problems facing the coal industry is how to properly dispose of the waste and/or even recovery a small fraction of the Btu value of the waste, while minimizing the environmental concerns. UCC Research considers this monumental environmental problems as an opportunity to recovery useable organic materials and reduce the environmental problems created by coal waste. Mild gasification is the method used by UCC Research to realize these objectives. Coal feedstocks are fed into the mild gasification system yielding liquids, char, and gases for commercial application. The program consists of seven tasks: Task 1, Characterize Managementmore » of Coal Preparation Wastes; Task 2, Review Design Specifications and Prepare Preliminary Test Plan; Task 3, Select and Characterize Test Feedstocks; Task 4, Acquire/Construct Process Elements; Task 5, Prepare Final Test Plan; Task 6, Implement Final Test Plan; Task 7, Analyze Test Results and Assess System Economics. A schedule of the program is given. The program was initiated on September 30, 1984. Tasks 1, 2, 3, 4, 5, and 6 have been completed. Work is continuing on Task 7.« less

  3. Training Decisions Technology Analysis

    DTIC Science & Technology

    1992-06-01

    4.5.1 Relational Data Base Management 69 4.5.2 TASCS Data Content 69 4.5.3 Relationships with TDS 69 4.6 Other Air Force Modeling R&D 70 4.6.1 Time ...executive decision making were first developed by M. S. Scott Morton in the early 1970’s who, at that time , termed them " management decision systems" (Scott...Allocations to Training Settings o Managers ’ Preferences for Task Allocations to Training Settings o Times Required to Training Tasks in Various

  4. FJET Database Project: Extract, Transform, and Load

    NASA Technical Reports Server (NTRS)

    Samms, Kevin O.

    2015-01-01

    The Data Mining & Knowledge Management team at Kennedy Space Center is providing data management services to the Frangible Joint Empirical Test (FJET) project at Langley Research Center (LARC). FJET is a project under the NASA Engineering and Safety Center (NESC). The purpose of FJET is to conduct an assessment of mild detonating fuse (MDF) frangible joints (FJs) for human spacecraft separation tasks in support of the NASA Commercial Crew Program. The Data Mining & Knowledge Management team has been tasked with creating and managing a database for the efficient storage and retrieval of FJET test data. This paper details the Extract, Transform, and Load (ETL) process as it is related to gathering FJET test data into a Microsoft SQL relational database, and making that data available to the data users. Lessons learned, procedures implemented, and programming code samples are discussed to help detail the learning experienced as the Data Mining & Knowledge Management team adapted to changing requirements and new technology while maintaining flexibility of design in various aspects of the data management project.

  5. 78 FR 67128 - Coral Reef Conservation Program; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Coral Reef Conservation Program; Meeting AGENCY: Coral Reef Conservation Program, Office of Ocean and Coastal Resource Management... meeting of the U.S. Coral Reef Task Force (USCRTF). The meeting will be held in Christiansted, U.S. Virgin...

  6. International Space Station ECLSS Technical Task Agreement Summary Report

    NASA Technical Reports Server (NTRS)

    Ray, C. D. (Compiler); Salyer, B. H. (Compiler)

    1999-01-01

    This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.

  7. Lessons learned from new construction utility demand side management programs and their implications for implementing building energy codes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wise, B.K.; Hughes, K.R.; Danko, S.L.

    1994-07-01

    This report was prepared for the US Department of Energy (DOE) Office of Codes and Standards by the Pacific Northwest Laboratory (PNL) through its Building Energy Standards Program (BESP). The purpose of this task was to identify demand-side management (DSM) strategies for new construction that utilities have adopted or developed to promote energy-efficient design and construction. PNL conducted a survey of utilities and used the information gathered to extrapolate lessons learned and to identify evolving trends in utility new-construction DSM programs. The ultimate goal of the task is to identify opportunities where states might work collaboratively with utilities to promotemore » the adoption, implementation, and enforcement of energy-efficient building energy codes.« less

  8. Improving the transition from medical school to internship - evaluation of a preparation for internship course.

    PubMed

    Scicluna, Helen A; Grimm, Michael C; Jones, Philip D; Pilotto, Louis S; McNeil, H Patrick

    2014-02-03

    This study evaluates the impact of a new 'Preparation for Internship' (PRINT) course, which was developed to facilitate the transition of University of New South Wales (UNSW) medical graduates from Medical School to Internship. During a period of major curricular reform, the 2007 (old program) and 2009 (new program) cohorts of UNSW final year students completed the Clinical Capability Questionnaire (CCQ) prior to and after undertaking the PRINT course. Clinical supervisors' ratings and self-ratings of UNSW 2009 medical graduates were obtained from the Hospital-based Prevocational Progress Review Form. Prior to PRINT, students from both cohorts perceived they had good clinical skills, with lower ratings for capability in procedural skills, operational management, and administrative tasks. After completing PRINT, students from both cohorts perceived significant improvement in their capability in procedural skills, operational management, and administrative tasks. Although PRINT also improved student-perceived capability in confidence, interpersonal skills and collaboration in both cohorts, curriculum reform to a new outcomes-based program was far more influential in improving self-perceptions in these facets of preparedness for hospital practice than PRINT. The PRINT course was most effective in improving students' perceptions of their capability in procedural skills, operational management and administrative tasks, indicating that student-to-intern transition courses should be clinically orientated, address relevant skills, use experiential learning, and focus on practical tasks. Other aspects that are important in preparation of medical students for hospital practice cannot be addressed in a PRINT course, but major improvements are achievable by program-wide curriculum reform.

  9. Improving the transition from medical school to internship – evaluation of a preparation for internship course

    PubMed Central

    2014-01-01

    Background This study evaluates the impact of a new 'Preparation for Internship’ (PRINT) course, which was developed to facilitate the transition of University of New South Wales (UNSW) medical graduates from Medical School to Internship. Methods During a period of major curricular reform, the 2007 (old program) and 2009 (new program) cohorts of UNSW final year students completed the Clinical Capability Questionnaire (CCQ) prior to and after undertaking the PRINT course. Clinical supervisors’ ratings and self-ratings of UNSW 2009 medical graduates were obtained from the Hospital-based Prevocational Progress Review Form. Results Prior to PRINT, students from both cohorts perceived they had good clinical skills, with lower ratings for capability in procedural skills, operational management, and administrative tasks. After completing PRINT, students from both cohorts perceived significant improvement in their capability in procedural skills, operational management, and administrative tasks. Although PRINT also improved student-perceived capability in confidence, interpersonal skills and collaboration in both cohorts, curriculum reform to a new outcomes-based program was far more influential in improving self-perceptions in these facets of preparedness for hospital practice than PRINT. Conclusions The PRINT course was most effective in improving students’ perceptions of their capability in procedural skills, operational management and administrative tasks, indicating that student-to-intern transition courses should be clinically orientated, address relevant skills, use experiential learning, and focus on practical tasks. Other aspects that are important in preparation of medical students for hospital practice cannot be addressed in a PRINT course, but major improvements are achievable by program-wide curriculum reform. PMID:24485072

  10. The Apollo Accreditation Program: A web-based Joint Commission International standards compliance management tool.

    PubMed

    Dewan, Shaveta; Sibal, Anupam; Uberoi, R S; Kaur, Ishneet; Nayak, Yogamaya; Kar, Sujoy; Loria, Gaurav; Yatheesh, G; Balaji, V

    2014-01-01

    Creating and implementing processes to deliver quality care in compliance with accreditation standards is a challenging task but even more daunting is sustaining these processes and systems. There is need for frequent monitoring of the gap between the expected level of care and the level of care actually delivered so as to achieve consistent level of care. The Apollo Accreditation Program (AAP) was implemented as a web-based single measurable dashboard to display, measure and compare compliance levels for established standards of care in JCI accredited hospitals every quarter and resulted in an overall 15.5% improvement in compliance levels over one year.

  11. Case Management: Let Us Count the Ways.

    ERIC Educational Resources Information Center

    Austin, Carol D.

    Case management as implemented in programs for the elderly, has focused on interactions between the client and case manager in the areas of assessment, care planning, service plan implementation, and follow-up. Variation in these case management tasks suggests that no single model can be implemented in all local delivery systems. This emphasis on…

  12. Bringing Reality to Classroom Management in Teacher Education

    ERIC Educational Resources Information Center

    Eisenman, Gordon; Edwards, Susan; Cushman, Carey Anne

    2015-01-01

    Learning how to manage a classroom effectively is a difficult task for preservice teachers. This is compounded by the lack of attention that classroom management receives in many teacher preparation programs and in the field of education in general. This article offers a rationale for the lack of attention to classroom management in teacher…

  13. NASIS data base management system - IBM 360/370 OS MVT implementation. 1: Installation standards

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The installation standards for the NASA Aerospace Safety Information System (NASIS) data base management system are presented. The standard approach to preparing systems documentation and the program design and coding rules and conventions are outlined. Included are instructions for preparing all major specifications and suggestions for improving the quality and efficiency of the programming task.

  14. Keeping Track of Our Treasures: Managing Historical Data with Relational Database Software.

    ERIC Educational Resources Information Center

    Gutmann, Myron P.; And Others

    1989-01-01

    Describes the way a relational database management system manages a large historical data collection project. Shows that such databases are practical to construct. States that the programing tasks involved are not for beginners, but the rewards of having data organized are worthwhile. (GG)

  15. Prototyping with Application Generators: Lessons Learned from the Naval Aviation Logistics Command Management Information System Case

    DTIC Science & Technology

    1992-10-01

    Prototyping with Application Generators: Lessons Learned from the Naval Aviation Logistics Command Management Information System Case. This study... management information system to automate manual Naval aviation maintenance tasks-NALCOMIS. With the use of a fourth-generation programming language

  16. Applicability Evaluation of Job Standards for Diabetes Nutritional Management by Clinical Dietitian.

    PubMed

    Baek, Young Jin; Oh, Na Gyeong; Sohn, Cheong-Min; Woo, Mi-Hye; Lee, Seung Min; Ju, Dal Lae; Seo, Jung-Sook

    2017-04-01

    This study was conducted to evaluate applicability of job standards for diabetes nutrition management by hospital clinical dietitians. In order to promote the clinical nutrition services, it is necessary to present job standards of clinical dietitian and to actively apply these standardized tasks to the medical institution sites. The job standard of clinical dietitians for diabetic nutrition management was distributed to hospitals over 300 beds. Questionnaire was collected from 96 clinical dietitians of 40 tertiary hospitals, 47 general hospitals, and 9 hospitals. Based on each 5-point scale, the importance of overall duty was 4.4 ± 0.5, performance was 3.6 ± 0.8, and difficulty was 3.1 ± 0.7. 'Nutrition intervention' was 4.5 ± 0.5 for task importance, 'nutrition assessment' was 4.0 ± 0.7 for performance, and 'nutrition diagnosis' was 3.4 ± 0.9 for difficulty. These 3 items were high in each category. Based on the grid diagram, the tasks of both high importance and high performance were 'checking basic information,' 'checking medical history and therapy plan,' 'decision of nutritional needs,' 'supply of foods and nutrients,' and 'education of nutrition and self-management.' The tasks with high importance but low performance were 'derivation of nutrition diagnosis,' 'planning of nutrition intervention,' 'monitoring of nutrition intervention process.' The tasks of both high importance and high difficulty were 'derivation of nutrition diagnosis,' 'planning of nutrition intervention,' 'supply of foods and nutrients,' 'education of nutrition and self-management,' and 'monitoring of nutrition intervention process.' The tasks of both high performance and high difficulty were 'documentation of nutrition assessment,' 'supply of foods and nutrients,' and 'education of nutrition and self-management.'

  17. Dental Assistant.

    ERIC Educational Resources Information Center

    Michigan State Univ., East Lansing. Coll. of Agriculture and Natural Resources Education Inst.

    This curriculum guide, developed for use in dental assistant education programs in Michigan, describes a task-based curriculum that can help a teacher to develop a classroom management system where students learn by doing. It is based on task analysis and reflects the skills, knowledge, and attitudes that employers expect entry-level dental…

  18. Structural Technology Evaluation Analysis Program (STEAP). Task Order 0029: Thermal Stability of Fatigue Life-Enhanced Structures

    DTIC Science & Technology

    2012-01-01

    and c, we were able to obtain Figure 21: Intensity and Pressure Temporal Profiles Calculated from Pressure Model 0 20 40 60 80 100 0 2 4 6 8...August 2008 – 31 January 2012 4 . TITLE AND SUBTITLE STRUCTURAL TECHNOLOGY EVALUATION ANALYSIS PROGRAM (STEAP) Task Order 0029: Thermal...Stability of Fatigue Life-Enhanced Structures 5a. CONTRACT NUMBER FA8650-04-D-3446-0029 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62201F 6

  19. Contamination Assessment Report, Site 26-6: Basin F. Version 3.3. Phase 1

    DTIC Science & Technology

    1988-05-01

    88173R02 AD-A2 7 5 700 -’ lEtUIUI LITIGATION TECHNICAL SUPPORT AND SERVICES Rocky Mountain Arsenal DTIC r ELECTF- FINAL PHASE I Q FEB7 1994...PREPARED BY ENVIRONMENTAL SCIENCE AND ENGINEERING, INC. Harding Lawson Associates Midwest Research Institute (Prepared under Task 19) Rocky- Mountain ...Arspn• FILE COP y Information Center PREPARED FOR Commerce City, Colorad U.S. ARMY PROGRAM MANAGER’S OFFICE FOR ROCKY MOUNTAIN ARSENAL THE INFORMATION

  20. National Security Issues 1982 Symposium. Worldwide Deployment of Tactical Forces and the C3I Connection, 4-5 October 1982.

    DTIC Science & Technology

    1982-10-01

    CONTRACT OR GRANT NUMBER(e) F19628-82-C-0001 9 PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT PROJECT, TASK The MITRE Corporation AREA...THiS PAGE(Whum Dam Emma• 19. (Concluded) EUROPEAN VIEW OF COALITION DEFENSE MANAGING C 3 1 NORTH ATLANTIC TREATY ORGANIZATION PACIFIC COMMAND...have a very organization of ESD very signifi- practical warmaking capability. If cantly, going from a iroduct- we must fight, we must be able to

  1. STORMWATER BEST MANAGEMENT PRACTICE MONITORING

    EPA Science Inventory

    Implementation of an effective BMP monitoring program is not a straight-forward task. BMPs by definition are devices, practices, or methods used to manage stormwater runoff. This umbrella term lumps widely varying techniques into a single category. Also, with the existence of ...

  2. Access management performance measures for Virginia : a practical approach for public accountability.

    DOT National Transportation Integrated Search

    2010-04-01

    In order to develop performance measures to communicate the effect of Virginias access management program, five : tasks were performed: (1) the appropriate literature was reviewed, (2) a catalog of potential performance measures was : developed, (...

  3. Infrastructure Task Force Tribal Solid Waste Management

    EPA Pesticide Factsheets

    These documents describe 1) issues to consider when planning and designing community engagement approaches for tribal integrated waste management programs and 2) a proposed approach to improve tribal open dumps data and solid waste projects, and 3) an MOU.

  4. Water Management Plan for Fort Buchanan, Puerto Rico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine

    2004-06-01

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.

  5. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  6. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  7. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  8. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  9. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  10. Matrix management in hospitals: testing theories of matrix structure and development.

    PubMed

    Burns, L R

    1989-09-01

    A study of 315 hospitals with matrix management programs was used to test several hypotheses concerning matrix management advanced by earlier theorists. The study verifies that matrix management involves several distinctive elements that can be scaled to form increasingly complex types of lateral coordinative devices. The scalability of these elements is evident only cross-sectionally. The results show that matrix complexity is not an outcome of program age, nor does matrix complexity at the time of implementation appear to influence program survival. Matrix complexity, finally, is not determined by the organization's task diversity and uncertainty. The results suggest several modifications in prevailing theories of matrix organization.

  11. Thermal management for high power space platform systems

    NASA Technical Reports Server (NTRS)

    Gualdoni, R. A.

    1980-01-01

    With future spacecraft power requirements expected to be in the order of 100 to 250 kilowatts and orbital lifetimes in the order of five to ten years, new approaches and concepts will be required that can efficiently and cost effectively provide the required heat rejection and temperature control capabilities. A plan was established to develop the commensurate technologies necessary for the thermal management of a high power space platform representative of future requirements and to achieve technology readiness by 1987. The approach taken in developing the program was to view the thermal requirements of the spacecraft as a spacecraft system rather than each as an isolated thermal problem. The program plan proposes 45 technology tasks required to achieve technology readiness. Of this total, 24 tasks were subsequently identified as being pacing technology tasks and were recommended for initiation in FY 1980 and FY 1981.

  12. Identification of Tasks in Home Economics Related Occupations: Food Service.

    ERIC Educational Resources Information Center

    Iowa State Univ. of Science and Technology, Ames. Dept. of Home Economics Education.

    The study was made to obtain curriculum development data for food service education programs below the baccalaureate level. Tasks related to the job functions of service, production, sanitation/safety, menu planning, procurement, supervision, and management were studied for five job categories of full-time personnel: middle-level service,…

  13. 77 FR 43344 - Notice of ACHP Quarterly Business Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Policy and Programs A. Legislative Agenda B. Rightsizing Task Force Report C. Sustainability Task Force Report D. United Nations Declaration on the Rights of Indigenous Peoples E. Fiftieth Anniversary of the... Report V. ACHP Management Issues A. Federal Budget Austerity and the ACHP B. Alumni Foundation Report C...

  14. Analysis of Workplace Health Education Performed by Occupational Health Managers in Korea.

    PubMed

    Kim, Yeon-Ha; Jung, Moon-Hee

    2016-09-01

    To evaluate workplace health education as practiced by occupational health managers based on standardized job tasks and suggest priority tasks and areas to be trained. The study was conducted between November 10, 2013 and April 30, 2014. The tool used in this study was standardized job tasks of workplace health education for occupational health managers which was developed through methodological steps. It was evaluated by 233 worksite occupational health managers. Data were analyzed using SPSS 21.0. Predicting variables of workplace health education performance were the "analysis and planning" factor, type of enterprise, and form of management. Healthcare professionals and occupational health managers who managed the nonmanufacturing industry showed high importance and low performance level in "analysis and planning" factor. "Analysis and planning" skill is priority training area for healthcare professionals and occupational health managers who managed nonmanufacturing industry. It is necessary to develop a training curriculum for occupational health managers that include improving analysis of worksites and plans for a health education program. Copyright © 2016. Published by Elsevier B.V.

  15. Management of radioactive material safety programs at medical facilities. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camper, L.W.; Schlueter, J.; Woods, S.

    A Task Force, comprising eight US Nuclear Regulatory Commission and two Agreement State program staff members, developed the guidance contained in this report. This report describes a systematic approach for effectively managing radiation safety programs at medical facilities. This is accomplished by defining and emphasizing the roles of an institution`s executive management, radiation safety committee, and radiation safety officer. Various aspects of program management are discussed and guidance is offered on selecting the radiation safety officer, determining adequate resources for the program, using such contractual services as consultants and service companies, conducting audits, and establishing the roles of authorized usersmore » and supervised individuals; NRC`s reporting and notification requirements are discussed, and a general description is given of how NRC`s licensing, inspection and enforcement programs work.« less

  16. [Progress of the ATM Crew}

    NASA Technical Reports Server (NTRS)

    Krabill, W. (Technical Monitor)

    2001-01-01

    Contract NAS5-99094 was initiated on December 1, 1998. The subject contract contains 5 tasks covering specific activities in support of 3 major sensor programs, each with a separate NASA Principal Investigator (PI). Accordingly, the bimonthly narrative is organized such that each of the programs are discussed separately with individual task activities presented within each of the programs. Acronyms are used throughout the report to keep the writing succinct. An attached glossary contains definitions for these acronyms.

  17. Using Cognitive Task Analysis and Eye Tracking to Understand Imagery Analysis

    DTIC Science & Technology

    2006-01-01

    Using Cognitive Task Analysis and Eye Tracking to Understand Imagery Analysis Laura Kurland, Abigail Gertner, Tom Bartee, Michael Chisholm and...have used these to study the analysts search behavior in detail. 2 EXPERIMENT Using a Cognitive Task Analysis (CTA) framework for knowledge...TITLE AND SUBTITLE Using Cognitive Task Analysis and Eye Tracking to Understand Imagery Analysis 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

  18. Disclosure, accommodations and self-care at work among adolescents with disabilities.

    PubMed

    Lindsay, Sally; McDougall, Carolyn; Sanford, Robyn

    2013-01-01

    The purpose of this study is to explore whether adolescents with disabilities disclose their condition and what types of accommodations are requested at work. In-depth, qualitative semi-structured interviews were conducted with 18 adolescents with a physical and/or mobility-related disability. We also reviewed their self- and staff assessments completed throughout an employment training program in which they took part. The findings show that most youth were able to disclose their conditions and recognize some of their limitations in performing tasks at work. Youth requested physical accommodations, more time to complete tasks and cognitive accommodations. Youth also performed several self-care tasks to manage their disability at work including personal care, pain management and fatigue. Within the context of this employment training program, youth were able to disclose their condition to their employer, ask for accommodations and manage their disability in the workplace. Educators and clinicians should: Assist youth in understanding whether, when and how to disclose their disability to their potential employer. Help youth to understand what accommodations are available to them in the workplace and how to access them, to help them to perform their job effectively. Coach youth on how to manage their disability in a work context, especially with regard to personal care, pain management and fatigue. Encourage and facilitate participation in experience-based opportunities to practice disclosure, requesting accommodations and self-management.

  19. Efficient Ada multitasking on a RISC register window architecture

    NASA Technical Reports Server (NTRS)

    Kearns, J. P.; Quammen, D.

    1987-01-01

    This work addresses the problem of reducing context switch overhead on a processor which supports a large register file - a register file much like that which is part of the Berkeley RISC processors and several other emerging architectures (which are not necessarily reduced instruction set machines in the purest sense). Such a reduction in overhead is particularly desirable in a real-time embedded application, in which task-to-task context switch overhead may result in failure to meet crucial deadlines. A storage management technique by which a context switch may be implemented as cheaply as a procedure call is presented. The essence of this technique is the avoidance of the save/restore of registers on the context switch. This is achieved through analysis of the static source text of an Ada tasking program. Information gained during that analysis directs the optimized storage management strategy for that program at run time. A formal verification of the technique in terms of an operational control model and an evaluation of the technique's performance via simulations driven by synthetic Ada program traces are presented.

  20. Core stability exercise is as effective as task-oriented motor training in improving motor proficiency in children with developmental coordination disorder: a randomized controlled pilot study.

    PubMed

    Au, Mei K; Chan, Wai M; Lee, Lin; Chen, Tracy Mk; Chau, Rosanna Mw; Pang, Marco Yc

    2014-10-01

    To compare the effectiveness of a core stability program with a task-oriented motor training program in improving motor proficiency in children with developmental coordination disorder (DCD). Randomized controlled pilot trial. Outpatient unit in a hospital. Twenty-two children diagnosed with DCD aged 6-9 years were randomly allocated to the core stability program or the task-oriented motor program. Both groups underwent their respective face-to-face training session once per week for eight consecutive weeks. They were also instructed to carry out home exercises on a daily basis during the intervention period. Short Form of the Bruininks-Oseretsky Test of Motor Proficiency (Second Edition) and Sensory Organization Test at pre- and post-intervention. Intention-to-treat analysis revealed no significant between-group difference in the change of motor proficiency standard score (P=0.717), and composite equilibrium score derived from the Sensory Organization Test (P=0.100). Further analysis showed significant improvement in motor proficiency in both the core stability (mean change (SD)=6.3(5.4); p=0.008) and task-oriented training groups (mean change(SD)=5.1(4.0); P=0.007). The composite equilibrium score was significantly increased in the task-oriented training group (mean change (SD)=6.0(5.5); P=0.009), but not in the core stability group (mean change(SD) =0.0(9.6); P=0.812). In the task-oriented training group, compliance with the home program was positively correlated with change in motor proficiency (ρ=0.680, P=0.030) and composite equilibrium score (ρ=0.638, P=0.047). The core stability exercise program is as effective as task-oriented training in improving motor proficiency among children with DCD. © The Author(s) 2014.

  1. Resident designed intern orientation to address the new ACGME Common Program Requirements for resident supervision.

    PubMed

    Rialon, Kristy L; Barfield, Michael E; Elfenbein, Dawn M; Lunsford, Keri E; Tracy, Elisabeth T; Migaly, John

    2013-01-01

    To design an orientation for surgical interns to meet the new Accreditation Council for Graduate Medical Education Common Program Requirements regarding supervision, to test patient-management competencies, and to assess confidence on skills and tasks pre-orientation and post-orientation. Twenty-seven incoming surgical interns participated in a two-day orientation to clinical duties. Activities included a pre-test, lectures, simulation, oral examination, intern shadowing, and a post-test. Incoming interns were surveyed before and after orientation and two months later for confidence in patient-management and surgical intern skills. Paired t-tests were used to determine if confidence improved pre-orientation and post-orientation, and two months following orientation. The study took place at an academic training hospital. All (n = 27) postgraduate year-1 (PGY-1) surgical residents at our institution, which included the categorical and nondesignated preliminary general surgery, urology, orthopedic surgery, otolaryngology, and neurosurgery programs. All interns passed the oral and written examinations, and were deemed able to be indirectly supervised, with direct supervision immediately available. They reported increased confidence in all areas of patient management addressed during orientation, and this confidence was retained after two months. In surgical and floor-related tasks and skills, interns reported no increase in confidence directly following orientation. However, after two months, they reported a significant increase in confidence, particularly in those tasks that are performed often. New requirements for resident supervision require creative ways of verifying resident competency in basic skills. This type of orientation is an effective way to address the new requirements of supervision and teach interns the tasks and skills that are necessary for internship. Copyright © 2013 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  2. Assessing healthcare professional knowledge, attitudes, and practices on hypertension management. Announcing a new World Hypertension League resource.

    PubMed

    Campbell, Norm R C; Dashdorj, Naranjargal; Baatarsuren, Uurtsaikh; Myanganbayar, Maral; Dashtseren, Myagmartseren; Unurjargal, Tsolmon; Zhang, Xin-Hua; Veiga, Eugenia Velludo; Beheiry, Hind Mamoun; Mohan, Sailesh; Almustafa, Bader; Niebylski, Mark; Lackland, Daniel

    2017-09-01

    To assist hypertension control programs and specifically the development of training and education programs on hypertension for healthcare professionals, the World Hypertension League has developed a resource to assess knowledge, attitudes, and practices on hypertension management. The resource assesses: (1) the importance of hypertension as a clinical and public health risk; (2) education in national or international hypertension recommendations; (3) lifestyle causes of hypertension; (4) measurement of blood pressure, screening, and diagnosis of hypertension; (5) lifestyle therapy counseling; (6) cardiovascular risk assessment; (7) antihypertensive drug therapy; and (8) adherence to therapy. In addition, the resource assesses the attitudes and practices of healthcare professionals for task sharing/shifting, use of care algorithms, and use of registries with performance reporting functions. The resource is designed to help support the Global Hearts Alliance to provide standardized and enhanced hypertension control globally. ©2017 Wiley Periodicals, Inc.

  3. How Expert Pilots Think Cognitive Processes in Expert Decision Making

    DTIC Science & Technology

    1993-02-01

    Management (CRM) This document is available to the public Advanced Qualification Program (AQP) through the National Technical Information Cognitive Task Analysis (CTA...8217 Selecting realistic EDM scenarios with critical events and performing a cognitive task analysis of novice vs. expert decision making for these events...scenarios with critical events and performing a cognitive task analysis of novice vs. expert decision making for these events is a basic requirement for

  4. Exploring the Use of a Multiplayer Game to Execute Light Infantry Company Missions

    DTIC Science & Technology

    2009-10-01

    training : (a) are trained sufficiently to implement the tasks (T), (b) need practice with implementing the task (P), and (c) are untrained on the task...approved for distribution: BARBARA A. BLACK, Ph.D. MICHELLE SAMS, Ph.D. Research Program Manager Director Training and...Maneuver Captains Career Course (MCCC) at Fort Benning, Georgia, have had limited success using training games. Early efforts to provide the MCCC with

  5. Defense Science Board Task Force Report: Predicting Violent Behavior

    DTIC Science & Technology

    2012-08-01

    Sciences Projects . Washington, DC: U.S. Department of Homeland Security, August 2009. http://www.dhs.gov/files/programs/gc_1218480185439.shtm Randazzo...5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...Defense Science Board (DSB),OUSD(AT&L) Room 3B888A,The Pentagon,Washington,DC,20310 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING

  6. Costs of Development and Maintenance of an Internet Program for Teens with Type 1 Diabetes

    PubMed Central

    Grey, Margaret; Liberti, Lauren; Whittemore, Robin

    2015-01-01

    Many adolescents with type 1 diabetes (T1D) have difficulty completing self-management tasks within the context of their social environments. Group-based approaches to psycho-educational support have been shown to prevent declines in glucose control, but are challenging to implement due to youths’ many activities and costs. A novel solution is providing psycho-educational support via the internet. The purpose of this study is to describe the cost of developing and maintaining two internet psycho-educational programs, both of which have been shown to improve health outcomes in adolescents with T1D. We calculated actual costs of personnel and programming in the development of TEENCOPE™ and Managing Diabetes, two highly interactive programs that were evaluated in a multi-site clinical trial (n=320). Cost calculations were set at U.S. dollars and converted to value for 2013 as expenses were incurred over 6 years. Development costs over 1.5 years totaled $324,609, with the majority of costs being for personnel to develop and write content in a creative and engaging format, to get feedback from teens on content and a prototype, and IT programming. Maintenance of the program, including IT support, a part-time moderator to assure safety of the discussion board (0.5–1 hour/week), and yearly update of content was $43,845/year, or $137.00 per youth over 4.5 years. Overall, program and site development were relatively expensive, but the program reach was high, including non-white youth from 4 geographically distinct regions. Once developed, maintenance was minimal. With greater dissemination, cost-per-youth would decrease markedly, beginning to offset the high development expense. PMID:26213677

  7. Costs of Development and Maintenance of an Internet Program for Teens with Type 1 Diabetes.

    PubMed

    Grey, Margaret; Liberti, Lauren; Whittemore, Robin

    2015-07-01

    Many adolescents with type 1 diabetes (T1D) have difficulty completing self-management tasks within the context of their social environments. Group-based approaches to psycho-educational support have been shown to prevent declines in glucose control, but are challenging to implement due to youths' many activities and costs. A novel solution is providing psycho-educational support via the internet. The purpose of this study is to describe the cost of developing and maintaining two internet psycho-educational programs, both of which have been shown to improve health outcomes in adolescents with T1D. We calculated actual costs of personnel and programming in the development of TEENCOPE ™ and Managing Diabetes, two highly interactive programs that were evaluated in a multi-site clinical trial (n=320). Cost calculations were set at U.S. dollars and converted to value for 2013 as expenses were incurred over 6 years. Development costs over 1.5 years totaled $324,609, with the majority of costs being for personnel to develop and write content in a creative and engaging format, to get feedback from teens on content and a prototype, and IT programming. Maintenance of the program, including IT support, a part-time moderator to assure safety of the discussion board (0.5-1 hour/week), and yearly update of content was $43,845/year, or $137.00 per youth over 4.5 years. Overall, program and site development were relatively expensive, but the program reach was high, including non-white youth from 4 geographically distinct regions. Once developed, maintenance was minimal. With greater dissemination, cost-per-youth would decrease markedly, beginning to offset the high development expense.

  8. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  9. Effects of Crew Resource Management Training on Medical Errors in a Simulated Prehospital Setting

    ERIC Educational Resources Information Center

    Carhart, Elliot D.

    2012-01-01

    This applied dissertation investigated the effect of crew resource management (CRM) training on medical errors in a simulated prehospital setting. Specific areas addressed by this program included situational awareness, decision making, task management, teamwork, and communication. This study is believed to be the first investigation of CRM…

  10. Relocation of the Deep Space Network Maintenance Center

    NASA Technical Reports Server (NTRS)

    Beutler, K. F.

    1981-01-01

    The Jet Propulsion Laboratory maintains a Deep Space Network (DSN) maintenance center (DMC), whose task is to engineer and manage the repair and calibration program for the electronic and mechanical equipment used in the tracking stations located at Madrid, Spain, and Canberra, Australia. The DMC also manages the Goldstone complex maintenance facility (GCMF), whose task is to repair and calibrate the Goldstone electronic and mechanical equipment. The rationale for moving the facility to Barstow, California, and the benefits derived from the move are discussed.

  11. The Environment for Application Software Integration and Execution (EASIE) version 1.0. Volume 1: Executive overview

    NASA Technical Reports Server (NTRS)

    Rowell, Lawrence F.; Davis, John S.

    1989-01-01

    The Environment for Application Software Integration and Execution (EASIE) provides a methodology and a set of software utility programs to ease the task of coordinating engineering design and analysis codes. EASIE was designed to meet the needs of conceptual design engineers that face the task of integrating many stand-alone engineering analysis programs. Using EASIE, programs are integrated through a relational database management system. Volume 1, Executive Overview, gives an overview of the functions provided by EASIE and describes their use. Three operational design systems based upon the EASIE software are briefly described.

  12. Strategic Petroleum Reserve and the Department of Energy's baseline assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Joe LaGrone of DOE's Oak Ridge Operations and John Milloway of the Strategic Petroleum Reserve (SPR) Task Force responded to allegations that the SPR program is providing an inadequate defense and that the program management is guilty of mismanagement and misconduct. The task force prepared a 307-page baseline assessment of the SPR that is critical of past practices, which it feels must be corrected. The assessment does not challenge the viability of the SPR program itself. Two appendices with additional responses from LaGrone and excerpts from the report follow the testimony. (DCK)

  13. Communications skills for CRM training

    NASA Technical Reports Server (NTRS)

    Shearer, M.

    1984-01-01

    A pilot training program in communication skills, listening, conflict solving, and task orientation, for a small but growing commuter airline is discussed. The interactions between pilots and management, and communication among crew members are examined. Methods for improvement of cockpit behavior management personnel relations are investigated.

  14. Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.

    ERIC Educational Resources Information Center

    Linford, Maxine D.; And Others

    The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…

  15. Training Vocational Rehabilitation Counselors in Group Dynamics: A Psychoeducational Model.

    ERIC Educational Resources Information Center

    Elliott, Timothy R.

    1990-01-01

    Describes a six-session psychoeducational program for training vocational rehabilitation counselors in group dynamics. Presents evaluation of program by counselors (N=15) in which leadership styles, conflict management, and typology of group tasks concepts were rated as most beneficial. (Author/ABL)

  16. New criteria for measuring range management activities.

    Treesearch

    T.M. Quigley; D.S. Dillard; J.B. [and others] Reese

    1989-01-01

    The USDA Forest Service national range program is currently evaluating its information needs at the national level A Range Measurement Task Group of Agency personnel was assembled in January 1988 to evaluate the information needs and recommend appropriate measures and reports. This document is the final recommendation of the task group. The recommendation includes...

  17. Technology Reinvestment Project Manufacturing Education and Training. Volume 1

    NASA Technical Reports Server (NTRS)

    Schroer, Bernard J.; Bond, Arthur J.

    1997-01-01

    The manufacturing education program is a joint program between the University of Alabama in Huntsville's (UAH) College of Engineering and Alabama A&M University's (AAMLJ) School of Engineering and Technology. The objective of the program is to provide more hands-on experiences to undergraduate engineering and engineering technology students. The scope of work consisted of. Year 1, Task 1: Review courses at Alabama Industrial Development Training (AIDT); Task 2: Review courses at UAH and AAMU; Task 3: Develop new lab manuals; Task 4: Field test manuals; Task 5: Prepare annual report. Year 2, Task 1: Incorporate feedback into lab manuals; Task 2 : Introduce lab manuals into classes; Task 3: Field test manuals; Task 4: Prepare annual report. Year 3, Task 1: Incorporate feedback into lab manuals; Task 2: Introduce lab manuals into remaining classes; Task 3: Conduct evaluation with assistance of industry; Task 4: Prepare final report. This report only summarizes the activities of the University of Alabama in Huntsville. The activities of Alabama A&M University are contained in a separate report.

  18. Preparedness for practice: a systematic cross-specialty evaluation of the alignment between postgraduate medical education and independent practice.

    PubMed

    Dijkstra, Ids S; Pols, Jan; Remmelts, Pine; Brand, Paul L P

    2015-02-01

    Postgraduate medical education training programs strive to prepare their trainees optimally for independent practice. Several studies have shown, however, that new consultants feel inadequately prepared for practice, and that this increases the risk of stress and burnout. To analyze across specialties for which tasks and themes new consultants feel inadequately prepared. And, to identify themes that need improved attention in postgraduate medical education programs or after registration. 330 New consultants from all hospital specialities with accredited training programs who completed their training in the north-eastern educational region of The Netherlands between 2004 and 2010 received a questionnaire which was based on a previously validated generic task inventory. 143 respondents (43%) returned the questionnaire. They felt excellently prepared for 40 tasks, well prepared for 25 tasks, marginally sufficiently prepared for 18 tasks and insufficiently prepared for 8 tasks. Preparedness scores were lowest for tasks concerning management administration and leadership, research, end-of-life care, and patient safety-related communication. Surgical specialists felt better prepared for practice than medical specialists, which could not be explained by differences in general self-efficacy. Although new consultants felt well prepared for medical tasks, the scores of more generic tasks indicate that the alignment between the different phases of the medical education continuum and independent practice needs improvement.

  19. Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions

    NASA Technical Reports Server (NTRS)

    Carl, John G.

    1973-01-01

    This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.

  20. 41 CFR 102-194.5 - What is the Standard and Optional Forms Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the Standard and Optional Forms Management Program? 102-194.5 Section 102-194.5 Public Contracts and Property Management... PROGRAMS 194-STANDARD AND OPTIONAL FORMS MANAGEMENT PROGRAM § 102-194.5 What is the Standard and Optional...

  1. Third Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

    NASA Technical Reports Server (NTRS)

    1994-01-01

    In May 1994, the Task Force on the Shuttle-Mir Rendezvous and Docking Missions was established by the NASA Advisory Council. Its purpose is to review Phase 1 (Shuttle-Mir) planning, training, operations, rendezvous and docking, and management and to provide interim reports containing specific recommendations to the Advisory Council. Phase 1 represents the building block to create the experience and technical expertise for an International Space Station. The Phase 1 program brings together the United States and Russia in a major cooperative and contractual program that takes advantage of both countries' capabilities. The content of the Phase 1 program consists of the following elements as defined by the Phase 1 Program Management Plan, dated October 6, 1994: Shuttle-Mir rendezvous and docking missions; astronaut long duration presence on Mir Requirements for Mir support of Phase 1 when astronauts are not on board; outfitting Spektr and Priroda modules with NASA science, research, and risk mitigation equipment Related ground support requirements of NASA and the Russian Space Agency (RSA) to support Phase 1 Integrated NASA and RSA launch schedules and manifests The first meeting of the Task Force was held at the Johnson Space Center (JSC) on May 24 and 25, 1994 with a preliminary report submitted to the NASA Advisory Council on June 6, 1994. The second meeting of the Task Force was held at JSC on July 12 and 13, 1994 and a detailed report containing a series of specific recommendations was submitted on July 29, 1994. This report reflects the results of the third Task Force meeting which was held at JSC on 11 and 12 October, 1994. The briefings presented at that meeting reviewed NASA's response to the Task Force recommendations made to date and provided background data and current status on several critical areas which the Task Force had not addressed in its previous reports.

  2. A Mobile, Map-Based Tasking Interface for Human-Robot Interaction

    DTIC Science & Technology

    2010-12-01

    A MOBILE, MAP-BASED TASKING INTERFACE FOR HUMAN-ROBOT INTERACTION By Eli R. Hooten Thesis Submitted to the Faculty of the Graduate School of...SUBTITLE A Mobile, Map-Based Tasking Interface for Human-Robot Interaction 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...3 II.1 Interactive Modalities and Multi-Touch . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 II.2

  3. Strategies of Successful Technology Integrators. Part I: Streamlining Classroom Management.

    ERIC Educational Resources Information Center

    McNally, Lynn; Etchison, Cindy

    2000-01-01

    Discussion of how to develop curriculum that successfully integrates technology into elementary and secondary school classrooms focuses on solutions for school and classroom management tasks. Highlights include Web-based solutions; student activities; word processing; desktop publishing; draw and paint programs; spreadsheets; and database…

  4. Space station human productivity study. Volume 5: Management plans

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

  5. Applicability Evaluation of Job Standards for Diabetes Nutritional Management by Clinical Dietitian

    PubMed Central

    2017-01-01

    This study was conducted to evaluate applicability of job standards for diabetes nutrition management by hospital clinical dietitians. In order to promote the clinical nutrition services, it is necessary to present job standards of clinical dietitian and to actively apply these standardized tasks to the medical institution sites. The job standard of clinical dietitians for diabetic nutrition management was distributed to hospitals over 300 beds. Questionnaire was collected from 96 clinical dietitians of 40 tertiary hospitals, 47 general hospitals, and 9 hospitals. Based on each 5-point scale, the importance of overall duty was 4.4 ± 0.5, performance was 3.6 ± 0.8, and difficulty was 3.1 ± 0.7. ‘Nutrition intervention’ was 4.5 ± 0.5 for task importance, ‘nutrition assessment’ was 4.0 ± 0.7 for performance, and ‘nutrition diagnosis’ was 3.4 ± 0.9 for difficulty. These 3 items were high in each category. Based on the grid diagram, the tasks of both high importance and high performance were ‘checking basic information,’ ‘checking medical history and therapy plan,’ ‘decision of nutritional needs,’ ‘supply of foods and nutrients,’ and ‘education of nutrition and self-management.’ The tasks with high importance but low performance were ‘derivation of nutrition diagnosis,’ ‘planning of nutrition intervention,’ ‘monitoring of nutrition intervention process.’ The tasks of both high importance and high difficulty were ‘derivation of nutrition diagnosis,’ ‘planning of nutrition intervention,’ ‘supply of foods and nutrients,’ ‘education of nutrition and self-management,’ and ‘monitoring of nutrition intervention process.’ The tasks of both high performance and high difficulty were ‘documentation of nutrition assessment,’ ‘supply of foods and nutrients,’ and ‘education of nutrition and self-management.’ PMID:28503506

  6. Flight Services and Aircraft Access: Active Flow Control Vertical Tail and Insect Accretion and Mitigation Flight Test

    NASA Technical Reports Server (NTRS)

    Whalen, Edward A.

    2016-01-01

    This document serves as the final report for the Flight Services and Aircraft Access task order NNL14AA57T as part of NASA Environmentally Responsible Aviation (ERA) Project ITD12A+. It includes descriptions of flight test preparations and execution for the Active Flow Control (AFC) Vertical Tail and Insect Accretion and Mitigation (IAM) experiments conducted on the 757 ecoDemonstrator. For the AFC Vertical Tail, this is the culmination of efforts under two task orders. The task order was managed by Boeing Research & Technology and executed by an enterprise-wide Boeing team that included Boeing Research & Technology, Boeing Commercial Airplanes, Boeing Defense and Space and Boeing Test and Evaluation. Boeing BR&T in St. Louis was responsible for overall Boeing project management and coordination with NASA. The 757 flight test asset was provided and managed by the BCA ecoDemonstrator Program, in partnership with Stifel Aircraft Leasing and the TUI Group. With this report, all of the required deliverables related to management of this task order have been met and delivered to NASA as summarized in Table 1. In addition, this task order is part of a broader collaboration between NASA and Boeing.

  7. 78 FR 14275 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... proposed action will be effective on April 5, 2013 unless comments are received which result in a contrary... management tasks, manpower-related tasks, and general administrative tasks related to employees by retrieving...

  8. MANAGING UNCERTAINTIES ASSOCIATED WITH RADIOACTIVE WASTE DISPOSAL: TASK GROUP 4 OF THE IAEA PRISM PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seitz, R.

    2011-03-02

    It is widely recognized that the results of safety assessment calculations provide an important contribution to the safety arguments for a disposal facility, but cannot in themselves adequately demonstrate the safety of the disposal system. The safety assessment and a broader range of arguments and activities need to be considered holistically to justify radioactive waste disposal at any particular site. Many programs are therefore moving towards the production of what has become known as a Safety Case, which includes all of the different activities that are conducted to demonstrate the safety of a disposal concept. Recognizing the growing interest inmore » the concept of a Safety Case, the International Atomic Energy Agency (IAEA) is undertaking an intercomparison and harmonization project called PRISM (Practical Illustration and use of the Safety Case Concept in the Management of Near-surface Disposal). The PRISM project is organized into four Task Groups that address key aspects of the Safety Case concept: Task Group 1 - Understanding the Safety Case; Task Group 2 - Disposal facility design; Task Group 3 - Managing waste acceptance; and Task Group 4 - Managing uncertainty. This paper addresses the work of Task Group 4, which is investigating approaches for managing the uncertainties associated with near-surface disposal of radioactive waste and their consideration in the context of the Safety Case. Emphasis is placed on identifying a wide variety of approaches that can and have been used to manage different types of uncertainties, especially non-quantitative approaches that have not received as much attention in previous IAEA projects. This paper includes discussions of the current results of work on the task on managing uncertainty, including: the different circumstances being considered, the sources/types of uncertainties being addressed and some initial proposals for approaches that can be used to manage different types of uncertainties.« less

  9. Total quality management: It works for aerospace information services

    NASA Technical Reports Server (NTRS)

    Erwin, James; Eberline, Carl; Colquitt, Wanda

    1993-01-01

    Today we are in the midst of information and 'total quality' revolutions. At the NASA STI Program's Center for AeroSpace Information (CASI), we are focused on using continuous improvements techniques to enrich today's services and products and to ensure that tomorrow's technology supports the TQM-based improvement of future STI program products and services. The Continuous Improvements Program at CASI is the foundation for Total Quality Management in products and services. The focus is customer-driven; its goal, to identify processes and procedures that can be improved and new technologies that can be integrated with the processes to gain efficiencies, provide effectiveness, and promote customer satisfaction. This Program seeks to establish quality through an iterative defect prevention approach that is based on the incorporation of standards and measurements into the processing cycle. Four projects are described that utilize cross-functional, problem-solving teams for identifying requirements and defining tasks and task standards, management participation, attention to critical processes, and measurable long-term goals. The implementation of these projects provides the customer with measurably improved access to information that is provided through several channels: the NASA STI Database, document requests for microfiche and hardcopy, and the Centralized Help Desk.

  10. The Benefits of Teaching Self-Management Skills to Students of Psychology

    ERIC Educational Resources Information Center

    Kazemi, Ellie; Rice, Brian; Rylander, Alyssa; Morgan, Shannon F.

    2011-01-01

    The various student gains and reported satisfaction with self-management projects have been well documented. However, we found that few psychology programs explicitly teach these skills. In this paper we demonstrate how self-management projects can meet nine out of the ten undergraduate student learning goals outlined by the APA Task Force (2002).…

  11. Criteria for Evaluating United States Marine Corps Installation Strategic Management

    DTIC Science & Technology

    2001-12-01

    STATES MARINE CORPS INSTALLATION STRATEGIC MANAGEMENT by James E. Leighty December 2001 Thesis Advisor: Joseph San Miguel Report...Marine Corps Installation Strategic Management Contract Number Grant Number Program Element Number Author(s) Leighty, James Project Number Task...TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE: Criteria For Evaluating United States Marine Corps Installation Strategic

  12. Management Trainee Program of Turkish Airlines: Global Distance Education

    ERIC Educational Resources Information Center

    Karasar, Sahin; Öztürk, Ömer Faruk

    2014-01-01

    It has always been a contested task to try to present a scientific base for the concept of "management." The concept of management, which has always been of great importance to the institutions and organizations, has gone through periodical changes both in terms of its structure and scope, and improved in a parallel fashion as the time…

  13. An Application of Instructional System Development to Determine Financial Management Education Needs for Logistics Management Positions.

    DTIC Science & Technology

    1976-09-01

    The purpose of this research effort was to determine the financial management educational needs of USAF graduate logistics positions. Goal analysis...was used to identify financial management techniques and task analysis was used to develop a method to identify the use of financial management techniques...positions. The survey identified financial management techniques in five areas: cost accounting, capital budgeting, working capital, financial forecasting, and programming. (Author)

  14. TRU Waste Management Program cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementationmore » would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)« less

  15. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 5: Design of the IPAD system. Part 2: System design. Part 3: General purpose utilities, phase 1, task 2

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.

    1973-01-01

    Viable designs are presented of various elements of the IPAD framework software, data base management system, and required new languages in relation to the capabilities of operating systems software. A thorough evaluation was made of the basic systems functions to be provide by each software element, its requirements defined in the conceptual design, the operating systems features affecting its design, and the engineering/design functions which it was intended to enhance.

  16. Database Design for Personnel Management in Republic of Korea Army.

    DTIC Science & Technology

    1984-06-01

    model for performing personnel management in ROK Army. After being designed, the computer programs should be fully tested. The author’s recommendations...S. CONTRACT OR GRANT NUMERae)" Kwang Soo Baek II 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT. TASKAREA 6 WORK UN IT...of these requirements complicate the already difficult task of providing safe and effcient access to computerized data. The designer should select an

  17. The growing importance of costs and ways to maintain cost control on a large program in today's competitive environment

    NASA Technical Reports Server (NTRS)

    Newman, J. J.; Grimes, D. W.; Gaetano, F. W.

    1973-01-01

    Discussion of management techniques that make it possible to overcome inflationary and developmental cost rises while holding schedule and performance fixed in scientific space programs. The techniques reviewed pertain to high personnel motivation, continual review of contract rigidity for de facto modification by senior judgment, standardization vs design innovation, cooperative customer/contractor goal orientation vs task orientation, and deep real-time management visibility.

  18. A Benchmarking Study of Air Force Program Manager Competencies

    DTIC Science & Technology

    2012-03-01

    New tools and techniques are needed for managing complex projects. • There is an inevitability of scope creep, especially if the project is...workforce could be reshaped. The Task Force identified new initiatives as well as existing DOD programs that were considered innovative approaches to...projected growth of its civilian workforce in order to keep civilian staffing at fiscal 2010 levels (AF News , 2011). One person hired for every two new

  19. Home Management and Human Service Competencies.

    ERIC Educational Resources Information Center

    Regional Learning Service of Central New York, Syracuse.

    Faculty representatives from five postsecondary institutions having human service/human ecology programs and two members of the Regional Learning Service staff comprised a task force whose objectives were to identify competencies acquired through home management which relate to undergraduate course objectives, to recommend ways to assess these,…

  20. The Role and Training of NASA Astronauts in the Post-Shuttle Era

    NASA Technical Reports Server (NTRS)

    2011-01-01

    In May 2010 the National Research Council (NRC) was asked by NASA to address several questions related to the Astronaut Corps. The NRC's Committee on Human Spaceflight Crew Operations was tasked to: 1. How should the role and size of the activities managed by the Johnson Space Center Flight Crew Operations Directorate change following space shuttle retirement and completion of the assembly of the International Space Station (ISS)? 2. What are the requirements for crew-related ground-based facilities after the Space Shuttle program ends? 3. Is the fleet of aircraft used for training the Astronaut Corps a cost-effective means of preparing astronauts to meet the requirements of NASA's human spaceflight program? Are there more cost-effective means of meeting these training requirements? Although the future of NASA's human spaceflight program has garnered considerable discussion in recent years, and there is considerable uncertainty about what that program will involve in the coming years, the committee was not tasked to address whether or not human spaceflight should continue, or what form it should take. The committee's task restricted it to studying those activities managed by the Flight Crew Operations Directorate, or those closely related to its activities, such as crew-related ground-based facilities and the training aircraft.

  1. Preparing for the High Frontier: The Role and Training of NASA Astronauts in the Post- Space Shuttle Era

    NASA Technical Reports Server (NTRS)

    2011-01-01

    In May 2010, the National Research Council (NRC) was asked by NASA to address several questions related to the Astronaut Corps. The NRC s Committee on Human Spaceflight Crew Operations was tasked to answer several questions: 1. How should the role and size of the activities managed by the Johnson Space Center Flight Crew Operations Directorate change after space shuttle retirement and completion of the assembly of the International Space Station (ISS)? 2. What are the requirements for crew-related ground-based facilities after the Space Shuttle program ends? 3. Is the fleet of aircraft used for training the Astronaut Corps a cost-effective means of preparing astronauts to meet the requirements of NASA s human spaceflight program? Are there more cost-effective means of meeting these training requirements? Although the future of NASA s human spaceflight program has garnered considerable discussion in recent years and there is considerable uncertainty about what the program will involve in the coming years, the committee was not tasked to address whether human spaceflight should continue or what form it should take. The committee s task restricted it to studying activities managed by the Flight Crew Operations Directorate or those closely related to its activities, such as crew-related ground-based facilities and the training aircraft.

  2. Improving the Functional Utility and Effectiveness of Classroom Services for Students with Profound Multiple Handicaps.

    ERIC Educational Resources Information Center

    Green, Carolyn W.; And Others

    1986-01-01

    A staff supervision and classroom management program to increase involvement in functional task activities (e.g., self-help, leisure, social/communication) was implemented in three classes serving 19 students (ages 11-36) with profound mental and physical handicaps. Large increases in functional task involvement and smaller increases in student…

  3. Technology Tools for the Tough Tasks: Plug in for Great Outcomes

    ERIC Educational Resources Information Center

    Simon, Fran

    2012-01-01

    There are a lot of easy-to-use online tools that can help teachers and administrators with the tough tasks involved in running efficient, responsive, and intentional programs. The efficiencies offered through these systems allow busy educators to spend less time managing information and more time doing the work that matters the most--working with…

  4. Report of the Task Force for Improved Coordination of the DoD Science and Technology Program. Volume 1. Summary Report and Recommendations

    DTIC Science & Technology

    1988-08-01

    be possible for management at all levels to review the S&T Program in order to optimize the investment in two ways--(1) over time and (2) by priority...easier at the higher management levels. a. Optimizing Over Time One concern in investing in new technology is to balance the near-term and far-term... managed and integrated into systems that meet the perceived threat on a timely basis. To this end, the Core Group formed working groups to find

  5. High-fidelity simulation of lung isolation with double-lumen endotracheal tubes and bronchial blockers in anesthesiology resident training.

    PubMed

    Failor, Erin; Bowdle, Andrew; Jelacic, Srdjan; Togashi, Kei

    2014-08-01

    Demonstrate the feasibility of using the AirSim Bronchi airway simulator to teach residents how to manage lung isolation with double-lumen endotracheal tubes and bronchial blockers and evaluate their performance with a detailed checklist. Prospective observational study. University anesthesiology residency training program. Anesthesiology residents taking a cardiothoracic anesthesiology rotation. Residents were instructed in 7 tasks using the AirSim Bronchi: The use of the fiberoptic bronchoscope, methods for placing left and right double-lumen endotracheal tubes and 3 bronchial blockers (Univent, Arndt, and Cohen), and application of continuous positive airway pressure (CPAP) to the unventilated lung. Two to 3 weeks later, checklists and a detailed scoring system were used to assess performance. Residents rated the curriculum and their own confidence in performing the tasks using a 5-point Likert scale. Thirteen residents completed the curriculum. Their median Likert scale ratings of the curriculum based on a questionnaire with 6 items ranged from 4 to 5 of 5. Resident confidence scores for each lung isolation technique improved after the simulation training, with the median gain ranging from 0.5 to 1.5 Likert levels depending on the task. The largest improvement occurred with the bronchial blockers (p<0.05). The median performance score for the 7 tasks combined was 88% of the maximum possible points. The authors used the AirSim Bronchi simulator in a novel simulation curriculum to teach lung-isolation techniques to anesthesiology residents and evaluated performance using a detailed checklist scoring system. This curriculum is a promising educational tool. Copyright © 2014 Elsevier Inc. All rights reserved.

  6. (U) Ristra Next Generation Code Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hungerford, Aimee L.; Daniel, David John

    LANL’s Weapons Physics management (ADX) and ASC program office have defined a strategy for exascale-class application codes that follows two supportive, and mutually risk-mitigating paths: evolution for established codes (with a strong pedigree within the user community) based upon existing programming paradigms (MPI+X); and Ristra (formerly known as NGC), a high-risk/high-reward push for a next-generation multi-physics, multi-scale simulation toolkit based on emerging advanced programming systems (with an initial focus on data-flow task-based models exemplified by Legion [5]). Development along these paths is supported by the ATDM, IC, and CSSE elements of the ASC program, with the resulting codes forming amore » common ecosystem, and with algorithm and code exchange between them anticipated. Furthermore, solution of some of the more challenging problems of the future will require a federation of codes working together, using established-pedigree codes in partnership with new capabilities as they come on line. The role of Ristra as the high-risk/high-reward path for LANL’s codes is fully consistent with its role in the Advanced Technology Development and Mitigation (ATDM) sub-program of ASC (see Appendix C), in particular its emphasis on evolving ASC capabilities through novel programming models and data management technologies.« less

  7. Using Participatory Management in a Traditional Environment.

    ERIC Educational Resources Information Center

    Tavarone, Antonia R.

    This paper describes the use of a participatory management process in an older, public-sector bureaucracy with an extremely traditional, hierarchical, and entrenched culture. Into this culture, two separate projects were introduced: an employee involvement program using the quality circle concept and a task force that would design and implement an…

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rybicki, E.F.; Sutrick, J.S.

    During the second quarter of Phase II, efforts were directed toward three tasks. One was including a subroutine to calculate pressure in the proppant transport model and preparing a users guide and tape for the computer program TUPROP1. The second was directed toward the proppant tracking capability of the program. The last task was combining the fracture geometry model and the proppant transport model. Progress on each of these areas is described. 5 refs., 1 fig., 5 tabs.

  9. Evaluation of the Trajectory Operations Applications Software Task (TOAST)

    NASA Technical Reports Server (NTRS)

    Perkins, Sharon; Martin, Andrea; Bavinger, Bill

    1990-01-01

    The Trajectory Operations Applications Software Task (TOAST) is a software development project under the auspices of the Mission Operations Directorate. Its purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle program. As an Application Manager, TOAST provides an isolation layer between the underlying Unix operating system and the series of user programs. It provides two main services: a common interface to operating system functions with semantics appropriate for C or FORTRAN, and a structured input and output package that can be utilized by user application programs. In order to evaluate TOAST as an Application Manager, the task was to assess current and planned capabilities, compare capabilities to functions available in commercially-available off the shelf (COTS) and Flight Analysis Design System (FADS) users for TOAST implementation. As a result of the investigation, it was found that the current version of TOAST is well implemented and meets the needs of the real-time users. The plans for migrating TOAST to the X Window System are essentially sound; the Executive will port with minor changes, while Menu Handler will require a total rewrite. A series of recommendations for future TOAST directions are included.

  10. Seeing Results in Flooring for Schools

    ERIC Educational Resources Information Center

    Simmons, Brian

    2011-01-01

    Operations staffs at education facilities of all sizes are tasked with selecting a hard floor cleaning program that is cost-effective, efficient and highly productive. With an increased focus on the sustainability of an environment, facility managers also must select a program that meets sustainability goals while maintaining a healthful, safe…

  11. MoDOT pavement preservation research program volume II, data collection for pavement management : historical data mining and production of data.

    DOT National Transportation Integrated Search

    2015-10-01

    The objective of Task 1 was to develop data for use in MoDOTs pavement preservation program based primarily on historical : information available throughout MoDOT as well as climate data from the National Oceanic and Atmospheric Administration : (...

  12. Review of the activities of COSMIC

    NASA Technical Reports Server (NTRS)

    Carmon, J. L.

    1983-01-01

    The activities of the Computer Software Management and Information Center involving the collection, processing, and distribution of software developed under the auspices of NASA and certain other federal agencies are reported. Program checkout and evaluation, inventory control, customer services and marketing, dissemination, program maintenance, and special development tasks are discussed.

  13. Information management and analysis system for groundwater data in Thailand

    NASA Astrophysics Data System (ADS)

    Gill, D.; Luckananurung, P.

    1992-01-01

    The Ground Water Division of the Thai Department of Mineral Resources maintains a large archive of groundwater data with information on some 50,000 water wells. Each well file contains information on well location, well completion, borehole geology, water levels, water quality, and pumping tests. In order to enable efficient use of this information a computer-based system for information management and analysis was created. The project was sponsored by the United Nations Development Program and the Thai Department of Mineral Resources. The system was designed to serve users who lack prior training in automated data processing. Access is through a friendly user/system dialogue. Tasks are segmented into a number of logical steps, each of which is managed by a separate screen. Selective retrieval is possible by four different methods of area definition and by compliance with user-specified constraints on any combination of database variables. The main types of outputs are: (1) files of retrieved data, screened according to users' specifications; (2) an assortment of pre-formatted reports; (3) computed geochemical parameters and various diagrams of water chemistry derived therefrom; (4) bivariate scatter diagrams and linear regression analysis; (5) posting of data and computed results on maps; and (6) hydraulic aquifer characteristics as computed from pumping tests. Data are entered directly from formatted screens. Most records can be copied directly from hand-written documents. The database-management program performs data integrity checks in real time, enabling corrections at the time of input. The system software can be grouped into: (1) database administration and maintenance—these functions are carried out by the SIR/DBMS software package; (2) user communication interface for task definition and execution control—the interface is written in the operating system command language (VMS/DCL) and in FORTRAN 77; and (3) scientific data-processing programs, written in FORTRAN 77. The system was implemented on a DEC MicroVAX II computer.

  14. A Study of the Impacts of Selected Products Developed by the National Center for Higher Education Management Systems.

    ERIC Educational Resources Information Center

    Rodgers, Kenneth W.; Rhodes, Isabelle N.

    The impact of NCHEMS (National Center for Higher Education Management Systems) products upon planning and management tasks is examined in this study performed at a sample of 126 institutions. The institutions have used one or more of the following NCHEMS products: Program Classification of Structure (PCS); Resource Requirements Prediction Model…

  15. Szendro - type Integrated Vegetation Fire Management--Wildfire Management Program from Hungary

    Treesearch

    Ágoston Restás

    2006-01-01

    Szendrő Fire Department is located in the northeastern part of Hungary. The main task is to fight against wildfire and mitigate the impact of fire at the Aggtelek National Park -- which belongs to the UNESCO World Heritage list. Because of greater effectiveness, in 2004 the Fire Department started a project named Integrated Vegetation Fire Management (IVFM)....

  16. Shortage of human resources in the Hungarian health care system: short-term or long-term problem?

    PubMed

    Belicza, Eva; Réthelyi, János; Kullmann, Lajos

    2003-01-01

    The Quality-management Committee of the Hungarian Hospital Federation and the Semmelweis University Health Services Management Training Centre, recognizing the threats of the human resources shortage and the consequential quality problems in the delivery of health care services, have launched a program for identifying the major problems and developing recommendations for decision makers and health service managers. The identification of the problems was performed by a task force group using a systematic methodology, recommendations were based on these findings. Members of the task force group were delegated by the Hungarian Hospital Federation and the Health Services Management Training Centre. Additional members were invited from the Ministry of Health and various other professional organizations.

  17. Flexible data-management system

    NASA Technical Reports Server (NTRS)

    Pelouch, J. J., Jr.

    1977-01-01

    Combined ASRDI Data-Management and Analysis Technique (CADMAT) is system of computer programs and procedures that can be used to conduct data-management tasks. System was developed specifically for use by scientists and engineers who are confronted with management and analysis of large quantities of data organized into records of events and parametric fields. CADMAT is particularly useful when data are continually accumulated, such as when the need of retrieval and analysis is ongoing.

  18. Air Force Geophysics Laboratory Management Information System Study.

    DTIC Science & Technology

    1985-11-01

    management information system (MIS) at AFGL. The study summarizes current management and administrative practices at AFGL. Requirements have been identified for automating several currently manual functions to compile accurate and timely information to better manage and plan AFGL programs. This document describes the functions and relative priorities of five MIS subsystems and provides suggestions for implementation solutions. Creation of a detailed Development Plan is recommended as the follow-on task.

  19. A Theoretical Model for Designing an In-House Community College Department Chair Professional Development Program

    ERIC Educational Resources Information Center

    Sirkis, Jocelyn Eager

    2013-01-01

    Academic department chairs serve as front-line managers and leaders who perform a wide variety of tasks. These tasks may include mundane chores, such as ordering office supplies, or important ones, such as changing the department culture to one that embraces assessment. Too often, however, individuals take on the chair position with little to no…

  20. Avionics Simulation, Development and Software Engineering

    NASA Technical Reports Server (NTRS)

    Francis, Ronald C.; Settle, Gray; Tobbe, Patrick A.; Kissel, Ralph; Glaese, John; Blanche, Jim; Wallace, L. D.

    2001-01-01

    This monthly report summarizes the work performed under contract NAS8-00114 for Marshall Space Flight Center in the following tasks: 1) Purchase Order No. H-32831D, Task Order 001A, GPB Program Software Oversight; 2) Purchase Order No. H-32832D, Task Order 002, ISS EXPRESS Racks Software Support; 3) Purchase Order No. H-32833D, Task Order 003, SSRMS Math Model Integration; 4) Purchase Order No. H-32834D, Task Order 004, GPB Program Hardware Oversight; 5) Purchase Order No. H-32835D, Task Order 005, Electrodynamic Tether Operations and Control Analysis; 6) Purchase Order No. H-32837D, Task Order 007, SRB Command Receiver/Decoder; and 7) Purchase Order No. H-32838D, Task Order 008, AVGS/DART SW and Simulation Support

  1. 76 FR 66763 - Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-510...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... of Technical Specifications Task Force Traveler TSTF-510, Revision 2, ``Revision to Steam Generator..., Revision 2, ``Revision to Steam Generator [(SG)] Program Inspection Frequencies and Tube Sample Selection..., ``Steam Generator (SG) Program,'' Specification 5.6.7, ``Steam Generator Tube Inspection Report,'' and the...

  2. Experiment module concepts study. Volume 5 book 1, appendix A: Shuttle only task

    NASA Technical Reports Server (NTRS)

    1970-01-01

    Results of a preliminary investigation of the effect on the candidate experiment program implementation of experiment module operations in the absence of an orbiting space station and with the availability of the space shuttle orbiter vehicle only are presented. The fundamental hardware elements for shuttle-only operation of the program are: (1) integrated common experiment modules CM-1, CM-3, and CM-4, together with the propulsion slice; (2) support modules capable of supplying on-orbit crew life support, power, data management, and other services normally provided by a space station; (3) dormancy kits to enable normally attached modules to remain in orbit while shuttle returns to earth; and (4) shuttle orbiter. Preliminary cost estimates for 30 day on-orbit and 5 day on-orbit capabilities for a four year implementation period are $4.2 billion and $2.1 billion, respectively.

  3. Communications System Architecture Development for Air Traffic Management and Aviation Weather Information Dissemination

    NASA Technical Reports Server (NTRS)

    Gallagher, Seana; Olson, Matt; Blythe, Doug; Heletz, Jacob; Hamilton, Griff; Kolb, Bill; Homans, Al; Zemrowski, Ken; Decker, Steve; Tegge, Cindy

    2000-01-01

    This document is the NASA AATT Task Order 24 Final Report. NASA Research Task Order 24 calls for the development of eleven distinct task reports. Each task was a necessary exercise in the development of comprehensive communications systems architecture (CSA) for air traffic management and aviation weather information dissemination for 2015, the definition of the interim architecture for 2007, and the transition plan to achieve the desired End State. The eleven tasks are summarized along with the associated Task Order reference. The output of each task was an individual task report. The task reports that make up the main body of this document include Task 5, Task 6, Task 7, Task 8, Task 10, and Task 11. The other tasks provide the supporting detail used in the development of the architecture. These reports are included in the appendices. The detailed user needs, functional communications requirements and engineering requirements associated with Tasks 1, 2, and 3 have been put into a relational database and are provided electronically.

  4. Continuous improvement of fitness-for-duty management programs for workers engaging in stabilizing and decommissioning work at the Fukushima Daiichi Nuclear Power Plant.

    PubMed

    Mori, Koji; Tateishi, Seiichiro; Kubo, Tatsuhiko; Kobayashi, Yuichi; Hiraoka, Ko; Kawashita, Futoshi; Hayashi, Takeshi; Kiyomoto, Yoshifumi; Kobashi, Masaki; Fukai, Kota; Tahara, Hiroyuki; Okazaki, Ryuji; Ogami, Akira; Igari, Kazuyuki; Suzuki, Katsunori; Kikuchi, Hiroshi; Sakai, Kazuhiro

    2018-03-27

    Numerous workers have participated in recovery efforts following the accident that occurred at the Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Plant after the Great East Japan Earthquake. These workers, belonging to various companies, have been engaged in various tasks since the accident. Given the hazards and stress involved in these tasks and the relatively long time required to transport sick or injured workers to medical institutions, it became necessary to quickly implement a more stringent management program for fitness for duty than in ordinary work environments. It took considerable time to introduce and improve a fitness-for-duty program because of several concerns. Various efforts were conducted, sometimes triggered by guidance from the Ministry of Health, Labour and Welfare (MHLW), but the implementation of the program was insufficient. In April 2016, a new program was initiated in which all primary contractors confirmed that their subcontractors had achieved five conditions for workers' fitness for duty on the basis of guidance from the MHLW and occupational health experts. TEPCO confirmed that all primary contractors had implemented the program successfully as of the end of November 2016. Following a disaster, even though the parties concerned understand the necessity of fitness-for-duty programs and that companies in high positions have responsibilities beyond their legal requirements, it is highly possible that they may hesitate to introduce such programs without guidance from the government. It is necessary to prepare a governmental framework and professional resources that introduce these stringent management programs quickly.

  5. Multi-Task Project to Provide Research Support for Human Research and Engineering Goals Identified by the Army

    DTIC Science & Technology

    2009-06-01

    Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V

  6. Alternative management and funding options for aeronautics programs, Task 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Research and technology will be at lower program levels with basic military research for aviation decreasing as fewer aircraft programs are initiated and the present new aircraft programs move into the prototype and production status. The key question is can industry take on the management and financing role and meet the criteria and characteristics considered essential for a viable research and technology program. The criteria for evaluating alternative approaches include an examination of the nature of the product to be provided, responsiveness to changing needs, efficiency in terms of costs, ability to provide leadership, and to provide impartial and independent evaluation of approaches, and to provide technological inputs for regulating functions.

  7. Implementation of the Air Program Information Management System (APIMS) Inspection Module

    DTIC Science & Technology

    2009-05-01

    7 5 T H A I R B A S E W I N G Implementation of the Air Program Information Management System (APIMS) Inspection Module 2009 Environment...Implementation of the Air Program Information Management System (APIMS) Inspection Module 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER

  8. The Grid[Way] Job Template Manager, a tool for parameter sweeping

    NASA Astrophysics Data System (ADS)

    Lorca, Alejandro; Huedo, Eduardo; Llorente, Ignacio M.

    2011-04-01

    Parameter sweeping is a widely used algorithmic technique in computational science. It is specially suited for high-throughput computing since the jobs evaluating the parameter space are loosely coupled or independent. A tool that integrates the modeling of a parameter study with the control of jobs in a distributed architecture is presented. The main task is to facilitate the creation and deletion of job templates, which are the elements describing the jobs to be run. Extra functionality relies upon the GridWay Metascheduler, acting as the middleware layer for job submission and control. It supports interesting features like multi-dimensional sweeping space, wildcarding of parameters, functional evaluation of ranges, value-skipping and job template automatic indexation. The use of this tool increases the reliability of the parameter sweep study thanks to the systematic bookkeeping of job templates and respective job statuses. Furthermore, it simplifies the porting of the target application to the grid reducing the required amount of time and effort. Program summaryProgram title: Grid[Way] Job Template Manager (version 1.0) Catalogue identifier: AEIE_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/AEIE_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland Licensing provisions: Apache license 2.0 No. of lines in distributed program, including test data, etc.: 3545 No. of bytes in distributed program, including test data, etc.: 126 879 Distribution format: tar.gz Programming language: Perl 5.8.5 and above Computer: Any (tested on PC x86 and x86_64) Operating system: Unix, GNU/Linux (tested on Ubuntu 9.04, Scientific Linux 4.7, centOS 5.4), Mac OS X (tested on Snow Leopard 10.6) RAM: 10 MB Classification: 6.5 External routines: The GridWay Metascheduler [1]. Nature of problem: To parameterize and manage an application running on a grid or cluster. Solution method: Generation of job templates as a cross product of the input parameter sets. Also management of the job template files including the job submission to the grid, control and information retrieval. Restrictions: The parameter sweep is limited by disk space during generation of the job templates. The wild-carding of parameters cannot be done in decreasing order. Job submission, control and information is delegated to the GridWay Metascheduler. Running time: From half a second in the simplest operation to a few minutes for thousands of exponential sampling parameters.

  9. French MALE UAV Program

    DTIC Science & Technology

    2003-09-02

    ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) MoD- France 8...1French Air Force MINISTÈRE DE LA DÉFENSE 1 SIDM CONOPS 2 FAF IMAGERY ARCHITECTURE 3 FUTURE FRENCH MALE UAV PROGRAM FRENCH MALE UAV PROGRAM Report...2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

  10. Increasing customer service behaviors using manager-delivered task clarification and social praise.

    PubMed

    Rice, Anna; Austin, John; Gravina, Nicole

    2009-01-01

    This project assessed an intervention to improve employee customer service behaviors (correct greetings and closing behaviors). A combination of task clarification and manager-delivered social praise resulted in increased correct greeting from 11.5% to 66% and correct closing from 8% to 70%. The effect was maintained at a 48-week follow-up for employees who were present during the initial study period, but not for more recently hired employees. The results suggest that task clarification combined with manager-delivered social praise is an effective way to improve employee customer service behaviors.

  11. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson Khosah

    2007-07-31

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project was conducted in two phases. Phase One included the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two involved the development of a platform for on-line data analysis. Phase Two included the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now technically completed.« less

  12. Health Services Management in the Health Administration Curriculum. Report by the Curriculum Task Force on Administration.

    ERIC Educational Resources Information Center

    Association of Univ. Programs in Health Administration, Washington, DC.

    Critical decisions that need to be made by faculties of health administration education programs when developing and assessing the health services management portion of the curriculum are identified. Decisions should draw from the information available concerning professional target roles of graduates, graduate behavior expected, resources for…

  13. Eric Lantz | NREL

    Science.gov Websites

    Lantz Photo of Eric Lantz Eric Lantz Manager II-Program Management Research Eric.Lantz@nrel.gov acceptance of renewable energy infrastructure. Eric was a contributing author to the IEA Wind Task 26, The published in 2013. Prior to joining NREL full-time, Eric was a graduate research partner to NREL and a

  14. Do medical residents perform patient-centered medical home tasks? A mixed-methods study

    PubMed Central

    Block, Lauren; LaVine, Nancy; Verbsky, Jennifer; Sagar, Ankita; Smith, Miriam A.; Lane, Susan; Conigliaro, Joseph; Chaudhry, Saima A.

    2017-01-01

    ABSTRACT Background: Increasingly, residents are being trained in Patient-centered Medical Home (PCMH) settings. A set of PCMH entrustable professional activities (EPAs) for residents has been defined but not evaluated in practice. Objective: To understand whether residents trained at PCMH sites reported higher likelihood of engaging in PCMH tasks than those training in non-PCMH sites. Design: Survey and nominal group data from post-graduate trainees at three residency programs. Results: A total of 179 residents responded (80% response). Over half (52%) cared for patients at PCMH sites. Residents at PCMH sites were more likely to report engaging in tasks in the NCQA domains of enhancing access and continuity (p < 0.01 for 4/11 tasks), planning and managing care (p < 0.01 for 3/4 tasks), providing self-care and community support (p < 0.01 for 3/5 tasks), and identifying and managing patient populations (p < 0.01 for 1/6 tasks), but were not more likely to report tracking and coordinating care or measuring and improving performance. Residents at PCMH sites were more likely to report working with medical assistants (p < 0.01), but not other healthcare professionals. Qualitative data showed staff teamwork and continuity of care as facilitators of patient-centered care, and technological problems and office inefficiencies as barriers to care. Conclusions: Residents trained at PCMH sites were more likely to engage in tasks in several NCQA domains, but not care coordination and quality assessment. Similar facilitators and barriers to trainee provision of patient-centered care were cited regardless of PCMH status. Curricula on PCMH principles and workflows that foster continuity and communication may help to inform residents on PCMH tenets and incorporate residents into team-based care. Abbreviations: EPA: Entrustable professional activity; GIM: General Internal Medicine; NCQA: National Center for Quality Assurance; PCMH: Patient-centered medical home PMID:28758564

  15. Crew workload-management strategies - A critical factor in system performance

    NASA Technical Reports Server (NTRS)

    Hart, Sandra G.

    1989-01-01

    This paper reviews the philosophy and goals of the NASA/USAF Strategic Behavior/Workload Management Program. The philosophical foundation of the program is based on the assumption that an improved understanding of pilot strategies will clarify the complex and inconsistent relationships observed among objective task demands and measures of system performance and pilot workload. The goals are to: (1) develop operationally relevant figures of merit for performance, (2) quantify the effects of strategic behaviors on system performance and pilot workload, (3) identify evaluation criteria for workload measures, and (4) develop methods of improving pilots' abilities to manage workload extremes.

  16. Aircrew-aircraft integration: A summary of US Army research programs and plans

    NASA Technical Reports Server (NTRS)

    Key, D. L.; Aiken, E. W.

    1984-01-01

    A review of selected programs which illustrate the research efforts of the U.S. Army Aeromechanics Laboratory in the area of aircrew-aircraft integration is presented. Plans for research programs to support the development of future military rotorcraft are also described. The crew of a combat helicopter must, in general, perform two major functions during the conduct of a particular mission: flightpath control and mission management. Accordingly, the research programs described are being conducted in the same two major categories: (1) flightpath control, which encompasses the areas of handling qualities, stability and control, and displays for the pilot's control of the rotorcraft's flightpath, and (2) mission management, which includes human factors and cockpit integration research topics related to performance of navigation, communication, and aircraft systems management tasks.

  17. Workplace Literacy Programs: A Review of the Literature.

    ERIC Educational Resources Information Center

    Dunn-Rankin, Patricia; Beil, Drake

    This literature review observes that (1) there is an increasing need for enhancing job literacy skills among workers; (2) workplace literacy programs cover both basic literacy and job-related technical training; (3) successful curricula use job-related tasks and materials; and (4) management needs to be heavily involved and committed if a program…

  18. Research-Based Online Course Development for Special Education Teacher Preparation

    ERIC Educational Resources Information Center

    Johnson, Lewis R.

    2004-01-01

    Distance education utilizing online courses has emerged as an area of program development for many teacher education programs. Online course learning management systems, such as Blackboard.com, have made putting a course online a relatively simple task; however, in many cases, the online course is little more than a correspondence course with a…

  19. Emergency Medical Services Program Administration Prototype Curriculum: Curriculum Guide.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    The curriculum guide was developed for training administrators (new entrants and incumbents), at the college level, in Emergency Medical Services (EMS) program administration. It is designed to be comprehensive and to include all knowledge and skills needed to perform the functions and tasks involved in EMS administration and management. The brief…

  20. The Effects of Tenure and Task Orientation on Air Force Program Manager’s Role Stress

    DTIC Science & Technology

    1976-06-16

    Force Systems Command (AFSC) Manuals called the 虇 series’- that, in detail, pre- scribed the Air Force form of project management—program...related jobs. These jobs are con- ducive to low tenure policies because organizacional dis- ruption is minimal when individuals rotate. Other jobs

  1. NASA/ESTO investments in remote sensing technologies (Conference Presentation)

    NASA Astrophysics Data System (ADS)

    Babu, Sachidananda R.

    2017-02-01

    For more then 18 years NASA Earth Science Technology Office has been investing in remote sensing technologies. During this period ESTO has invested in more then 900 tasks. These tasks are managed under multiple programs like Instrument Incubator Program (IIP), Advanced Component Technology (ACT), Advanced Information Systems Technology (AIST), In-Space Validation of Earth Science Technologies (InVEST), Sustainable Land Imaging - Technology (SLI-T) and others. This covers the whole spectrum of technologies from component to full up satellite in space and software. Over the years many of these technologies have been infused into space missions like Aquarius, SMAP, CYGNSS, SWOT, TEMPO and others. Over the years ESTO is actively investing in Infrared sensor technologies for space applications. Recent investments have been for SLI-T and InVEST program. On these tasks technology development is from simple Bolometers to Advanced Photonic waveguide based spectrometers. Some of the details on these missions and technologies will be presented.

  2. ESTO Investments in Innovative Sensor Technologies for Remote Sensing

    NASA Technical Reports Server (NTRS)

    Babu, Sachidananda R.

    2017-01-01

    For more then 18 years NASA Earth Science Technology Office has been investing in remote sensing technologies. During this period ESTO has invested in more then 900 tasks. These tasks are managed under multiple programs like Instrument Incubator Program (IIP), Advanced Component Technology (ACT), Advanced Information Systems Technology (AIST), In-Space Validation of Earth Science Technologies (InVEST), Sustainable Land Imaging - Technology (SLI-T) and others. This covers the whole spectrum of technologies from component to full up satellite in space and software. Over the years many of these technologies have been infused into space missions like Aquarius, SMAP, CYGNSS, SWOT, TEMPO and others. Over the years ESTO is actively investing in Infrared sensor technologies for space applications. Recent investments have been for SLI-T and InVEST program. On these tasks technology development is from simple Bolometers to Advanced Photonic waveguide based spectrometers. Some of the details on these missions and technologies will be presented.

  3. Federal Personnel. Federal Agencies' Part-Time Employment Programs. Briefing Report to the Chairwoman, Task Force on Economic Security, Select Committee on Children, Youth and Families, House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    This report provides information on permanent part-time employment programs in the federal government. It contains statistical data showing general characteristics of the federal part-time work force and information about the part-time employment programs of the Office of Personnel Management (OPM), Veterans Administration, General Services…

  4. User's manual for the generalized computer program system. Open-channel flow and sedimentation, TABS-2. Main text

    NASA Astrophysics Data System (ADS)

    Thomas, W. A.; McAnally, W. H., Jr.

    1985-07-01

    TABS-2 is a generalized numerical modeling system for open-channel flows, sedimentation, and constituent transport. It consists of more than 40 computer programs to perform modeling and related tasks. The major modeling components--RMA-2V, STUDH, and RMA-4--calculate two-dimensional, depth-averaged flows, sedimentation, and dispersive transport, respectively. The other programs in the system perform digitizing, mesh generation, data management, graphical display, output analysis, and model interfacing tasks. Utilities include file management and automatic generation of computer job control instructions. TABS-2 has been applied to a variety of waterways, including rivers, estuaries, bays, and marshes. It is designed for use by engineers and scientists who may not have a rigorous computer background. Use of the various components is described in Appendices A-O. The bound version of the report does not include the appendices. A looseleaf form with Appendices A-O is distributed to system users.

  5. Workshop on Aeronautical Decision Making (ADM). Volume 1. Executive Summary

    DTIC Science & Technology

    1992-08-01

    expert and novice pilots when a real decision was required. Aeronautical Decision Making (ADM), Crew Resource Management (CRM), Advanced Qualification Program (AQP), Cognitive Task Analysis (CTA), Expert Decision Making (EDM)

  6. BIRCH: a user-oriented, locally-customizable, bioinformatics system.

    PubMed

    Fristensky, Brian

    2007-02-09

    Molecular biologists need sophisticated analytical tools which often demand extensive computational resources. While finding, installing, and using these tools can be challenging, pipelining data from one program to the next is particularly awkward, especially when using web-based programs. At the same time, system administrators tasked with maintaining these tools do not always appreciate the needs of research biologists. BIRCH (Biological Research Computing Hierarchy) is an organizational framework for delivering bioinformatics resources to a user group, scaling from a single lab to a large institution. The BIRCH core distribution includes many popular bioinformatics programs, unified within the GDE (Genetic Data Environment) graphic interface. Of equal importance, BIRCH provides the system administrator with tools that simplify the job of managing a multiuser bioinformatics system across different platforms and operating systems. These include tools for integrating locally-installed programs and databases into BIRCH, and for customizing the local BIRCH system to meet the needs of the user base. BIRCH can also act as a front end to provide a unified view of already-existing collections of bioinformatics software. Documentation for the BIRCH and locally-added programs is merged in a hierarchical set of web pages. In addition to manual pages for individual programs, BIRCH tutorials employ step by step examples, with screen shots and sample files, to illustrate both the important theoretical and practical considerations behind complex analytical tasks. BIRCH provides a versatile organizational framework for managing software and databases, and making these accessible to a user base. Because of its network-centric design, BIRCH makes it possible for any user to do any task from anywhere.

  7. BIRCH: A user-oriented, locally-customizable, bioinformatics system

    PubMed Central

    Fristensky, Brian

    2007-01-01

    Background Molecular biologists need sophisticated analytical tools which often demand extensive computational resources. While finding, installing, and using these tools can be challenging, pipelining data from one program to the next is particularly awkward, especially when using web-based programs. At the same time, system administrators tasked with maintaining these tools do not always appreciate the needs of research biologists. Results BIRCH (Biological Research Computing Hierarchy) is an organizational framework for delivering bioinformatics resources to a user group, scaling from a single lab to a large institution. The BIRCH core distribution includes many popular bioinformatics programs, unified within the GDE (Genetic Data Environment) graphic interface. Of equal importance, BIRCH provides the system administrator with tools that simplify the job of managing a multiuser bioinformatics system across different platforms and operating systems. These include tools for integrating locally-installed programs and databases into BIRCH, and for customizing the local BIRCH system to meet the needs of the user base. BIRCH can also act as a front end to provide a unified view of already-existing collections of bioinformatics software. Documentation for the BIRCH and locally-added programs is merged in a hierarchical set of web pages. In addition to manual pages for individual programs, BIRCH tutorials employ step by step examples, with screen shots and sample files, to illustrate both the important theoretical and practical considerations behind complex analytical tasks. Conclusion BIRCH provides a versatile organizational framework for managing software and databases, and making these accessible to a user base. Because of its network-centric design, BIRCH makes it possible for any user to do any task from anywhere. PMID:17291351

  8. Increasing Customer Service Behaviors Using Manager-Delivered Task Clarification and Social Praise

    ERIC Educational Resources Information Center

    Rice, Anna; Austin, John; Gravina, Nicole

    2009-01-01

    This project assessed an intervention to improve employee customer service behaviors (correct greetings and closing behaviors). A combination of task clarification and manager-delivered social praise resulted in increased correct greeting from 11.5% to 66% and correct closing from 8% to 70%. The effect was maintained at a 48-week follow-up for…

  9. A Measure of Search Efficiency in a Real World Search Task (PREPRINT)

    DTIC Science & Technology

    2009-02-16

    Search Task 5a. CONTRACT NUMBER N00173-08-1-G030 5b. GRANT NUMBER NRL BAA 08-09, 55-07-01 5c. PROGRAM ELEMENT NUMBER 0602782N 6. AUTHOR(S... Beck , Melissa R. Ph.D (LSU) Maura C. Lohrenz (NRL Code 7440.1) J. Gregory Trafton (NRL Code 5515) 5d. PROJECT NUMBER 08294 5e. TASK NUMBER... Beck 19b. TELEPHONE NUMBER (Include area code) (225)578-7214 Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39.18 A measure of search

  10. Educational approaches for discouraging plagiarism.

    PubMed

    Fischer, Beth A; Zigmond, Michael J

    2011-01-01

    Suggested approaches to reduce the occurrence of plagiarism in academia, particularly among trainees. These include (1) educating individuals as to the definition of plagiarism and its consequences through written guidelines, active discussions, and practice in identifying proper and improper citation practices; (2) distributing checklists that break the writing task into more manageable steps, (3) requiring the submission of an outline and then a first draft prior to the deadline for a paper; (4) making assignments relevant to individual interests; and (5) providing trainees with access to software programs that detect plagiarism. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. Scaffold: Quantum Programming Language

    DTIC Science & Technology

    2012-07-24

    Europe, 2012. [8] B. Eastin and S . T. Flammia , “Q-circuit tutorial,” arXiv:quant-ph/0406003v2. [9] A. I. Faruque et al., “Scaffold: Quantum Programming...TITLE AND SUBTITLE Scaffold: Quantum Programming Language 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d...PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Princeton University,Department of Computer

  12. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-04-10

    Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK...Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008) quoted Admiral Gary Roughead, the Chief of Naval...question is whether the schedule for procuring CG(X)s is properly aligned with foreign-country ballistic missile development programs. A 2005 defense

  13. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-09-18

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...October 27, 2008. Another press report (Katherine McIntire Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures... aligned with foreign-country ballistic missile development programs. A 2005 defense trade press report, for example, states that “navy officials

  14. Elections: DOD Can Strengthen Evaluation of Its Absentee Voting Assistance Program

    DTIC Science & Technology

    2010-06-01

    Evaluation of Its Absentee Voting Assistance Program June 2010 GAO-10-476 Report Documentation Page Form ApprovedOMB No. 0704-0188 Public...4. TITLE AND SUBTITLE Elections: DOD Can Strengthen Evaluation of Its Absentee Voting Assistance Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES

  15. Achievement Place: development of the elected manager system1

    PubMed Central

    Phillips, Elery L.; Phillips, Elaine A.; Wolf, Montrose M.; Fixsen, Dean L.

    1973-01-01

    A series of experiments was carried out to compare several administrative systems at Achievement Place, a family style behavior modification program for pre-delinquent boys. One aspect of the motivation system at Achievement Place was the token economy in which the youths could earn or lose points that could be exchanged for privileges. Several arrangements for assigning routine tasks and for providing token consequences for task performance were compared for their effectiveness in accomplishing the tasks and for their preference by the boys. The independent variables studied included: (1) individually assigned tasks versus group assigned tasks; (2) consequences for individual performance versus consequences for group performance; (3) a peer managership that could be earned by the highest bidder versus a peer managership that could be determined democratically by the peers. The results suggested that among those systems studied the system that best met the criteria of effectiveness and preference involved a democratically elected peer manager who had the authority both to give and to take away points for his peers' performances. PMID:16795439

  16. Contribution of Global Polio Eradication Initiative–Funded Personnel to the Strengthening of Routine Immunization Programs in the 10 Focus Countries of the Polio Eradication and Endgame Strategic Plan

    PubMed Central

    Swift, Rachel D.; Anaokar, Sameer; Hegg, Lea Anne; Eggers, Rudolf; Cochi, Stephen L.

    2017-01-01

    Abstract Background. The Polio Eradication and Endgame Strategic Plan (PEESP) established a target that at least 50% of the time of personnel receiving funding from the Global Polio Eradication Initiative (GPEI) for polio eradication activities (hereafter, “GPEI-funded personnel”) should be dedicated to the strengthening of immunization systems. This article describes the self-reported profile of how GPEI-funded personnel allocate their time toward immunization goals and activities beyond those associated with polio, the training they have received to conduct tasks to strengthen routine immunization systems, and the type of tasks they have conducted. Methods. A survey of approximately 1000 field managers of frontline GPEI-funded personnel was conducted by Boston Consulting Group in the 10 focus countries of the PEESP during 2 phases, in 2013 and 2014, to determine time allocation among frontline staff. Country-specific reports on the training of GPEI-funded personnel were reviewed, and an analysis of the types of tasks that were reported was conducted. Results. A total of 467 managers responded to the survey. Forty-seven percent of the time (range, 23%–61%) of GPEI-funded personnel was dedicated to tasks related to strengthening immunization programs, other than polio eradication. Less time was spent on polio-associated activities in countries that had already interrupted wild poliovirus (WPV) transmission, compared with findings for WPV-endemic countries. All countries conducted periodic trainings of the GPEI-funded personnel. The types of non–polio-related tasks performed by GPEI-funded personnel varied among countries and included surveillance, microplanning, newborn registration and defaulter tracing, monitoring of routine immunization activities, and support of district immunization task teams, as well as promotion of health behaviors, such as clean-water use and good hygiene and sanitation practices. Conclusion. In all countries, GPEI-funded personnel perform critical tasks in the strengthening of routine immunization programs and the control of measles and rubella. In certain countries with very weak immunization systems, GPEI-funded personnel provide critical support for the immunization programs, and sudden discontinuation of their employment would potentially disrupt the immunization programs in their countries and create a setback in capacity and effectiveness that would put children at higher risk for vaccine-preventable diseases. PMID:28838165

  17. Contribution of Global Polio Eradication Initiative-Funded Personnel to the Strengthening of Routine Immunization Programs in the 10 Focus Countries of the Polio Eradication and Endgame Strategic Plan.

    PubMed

    van den Ent, Maya M V X; Swift, Rachel D; Anaokar, Sameer; Hegg, Lea Anne; Eggers, Rudolf; Cochi, Stephen L

    2017-07-01

    The Polio Eradication and Endgame Strategic Plan (PEESP) established a target that at least 50% of the time of personnel receiving funding from the Global Polio Eradication Initiative (GPEI) for polio eradication activities (hereafter, "GPEI-funded personnel") should be dedicated to the strengthening of immunization systems. This article describes the self-reported profile of how GPEI-funded personnel allocate their time toward immunization goals and activities beyond those associated with polio, the training they have received to conduct tasks to strengthen routine immunization systems, and the type of tasks they have conducted. A survey of approximately 1000 field managers of frontline GPEI-funded personnel was conducted by Boston Consulting Group in the 10 focus countries of the PEESP during 2 phases, in 2013 and 2014, to determine time allocation among frontline staff. Country-specific reports on the training of GPEI-funded personnel were reviewed, and an analysis of the types of tasks that were reported was conducted. A total of 467 managers responded to the survey. Forty-seven percent of the time (range, 23%-61%) of GPEI-funded personnel was dedicated to tasks related to strengthening immunization programs, other than polio eradication. Less time was spent on polio-associated activities in countries that had already interrupted wild poliovirus (WPV) transmission, compared with findings for WPV-endemic countries. All countries conducted periodic trainings of the GPEI-funded personnel. The types of non-polio-related tasks performed by GPEI-funded personnel varied among countries and included surveillance, microplanning, newborn registration and defaulter tracing, monitoring of routine immunization activities, and support of district immunization task teams, as well as promotion of health behaviors, such as clean-water use and good hygiene and sanitation practices. In all countries, GPEI-funded personnel perform critical tasks in the strengthening of routine immunization programs and the control of measles and rubella. In certain countries with very weak immunization systems, GPEI-funded personnel provide critical support for the immunization programs, and sudden discontinuation of their employment would potentially disrupt the immunization programs in their countries and create a setback in capacity and effectiveness that would put children at higher risk for vaccine-preventable diseases. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.

  18. Integrated Task and Data Parallel Programming

    NASA Technical Reports Server (NTRS)

    Grimshaw, A. S.

    1998-01-01

    This research investigates the combination of task and data parallel language constructs within a single programming language. There are an number of applications that exhibit properties which would be well served by such an integrated language. Examples include global climate models, aircraft design problems, and multidisciplinary design optimization problems. Our approach incorporates data parallel language constructs into an existing, object oriented, task parallel language. The language will support creation and manipulation of parallel classes and objects of both types (task parallel and data parallel). Ultimately, the language will allow data parallel and task parallel classes to be used either as building blocks or managers of parallel objects of either type, thus allowing the development of single and multi-paradigm parallel applications. 1995 Research Accomplishments In February I presented a paper at Frontiers 1995 describing the design of the data parallel language subset. During the spring I wrote and defended my dissertation proposal. Since that time I have developed a runtime model for the language subset. I have begun implementing the model and hand-coding simple examples which demonstrate the language subset. I have identified an astrophysical fluid flow application which will validate the data parallel language subset. 1996 Research Agenda Milestones for the coming year include implementing a significant portion of the data parallel language subset over the Legion system. Using simple hand-coded methods, I plan to demonstrate (1) concurrent task and data parallel objects and (2) task parallel objects managing both task and data parallel objects. My next steps will focus on constructing a compiler and implementing the fluid flow application with the language. Concurrently, I will conduct a search for a real-world application exhibiting both task and data parallelism within the same program. Additional 1995 Activities During the fall I collaborated with Andrew Grimshaw and Adam Ferrari to write a book chapter which will be included in Parallel Processing in C++ edited by Gregory Wilson. I also finished two courses, Compilers and Advanced Compilers, in 1995. These courses complete my class requirements at the University of Virginia. I have only my dissertation research and defense to complete.

  19. Integrated Task And Data Parallel Programming: Language Design

    NASA Technical Reports Server (NTRS)

    Grimshaw, Andrew S.; West, Emily A.

    1998-01-01

    his research investigates the combination of task and data parallel language constructs within a single programming language. There are an number of applications that exhibit properties which would be well served by such an integrated language. Examples include global climate models, aircraft design problems, and multidisciplinary design optimization problems. Our approach incorporates data parallel language constructs into an existing, object oriented, task parallel language. The language will support creation and manipulation of parallel classes and objects of both types (task parallel and data parallel). Ultimately, the language will allow data parallel and task parallel classes to be used either as building blocks or managers of parallel objects of either type, thus allowing the development of single and multi-paradigm parallel applications. 1995 Research Accomplishments In February I presented a paper at Frontiers '95 describing the design of the data parallel language subset. During the spring I wrote and defended my dissertation proposal. Since that time I have developed a runtime model for the language subset. I have begun implementing the model and hand-coding simple examples which demonstrate the language subset. I have identified an astrophysical fluid flow application which will validate the data parallel language subset. 1996 Research Agenda Milestones for the coming year include implementing a significant portion of the data parallel language subset over the Legion system. Using simple hand-coded methods, I plan to demonstrate (1) concurrent task and data parallel objects and (2) task parallel objects managing both task and data parallel objects. My next steps will focus on constructing a compiler and implementing the fluid flow application with the language. Concurrently, I will conduct a search for a real-world application exhibiting both task and data parallelism within the same program m. Additional 1995 Activities During the fall I collaborated with Andrew Grimshaw and Adam Ferrari to write a book chapter which will be included in Parallel Processing in C++ edited by Gregory Wilson. I also finished two courses, Compilers and Advanced Compilers, in 1995. These courses complete my class requirements at the University of Virginia. I have only my dissertation research and defense to complete.

  20. How Can the Norwegian Leader Development Program Improve to Better Develop Leaders?

    DTIC Science & Technology

    2012-12-14

    GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) LTC Stig Santiago Bjoernaes 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...developmental enables individuals to pursue professional and personal goals in a life - 3James Kouzes and...

  1. Initiating the 2002 Mars Science Laboratory (MSL) Technology Program

    NASA Technical Reports Server (NTRS)

    Caffrey, Robert T.; Udomkesmalee, Gabriel; Hayati, Samad A.; Henderson, Rebecca

    2004-01-01

    The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to investigate the Martian environment and requires new capabilities that are currently are not available. The MSL Technology Program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by JPL and is divided into a Focused Program and a Base Program. The MSL Technology Program is under the focused program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology's requirements and the development process are tightly coordinated with the Project. The MSL Technology Program combines the proven management techniques of flight projects with the commercial technology management strategies of industry and academia, to create a technology management program that meets the short-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment. This paper also provides an update of the 2003 MSL technology program and examines some of the drivers that changed the program from its initiation.

  2. Mobile Language Study

    DTIC Science & Technology

    2003-08-18

    Language Study 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5d. TASK NUMBER 6. AUTHOR(S) Professor Mads Dam, Pablo Giambiagi 5e...Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39-18 SPC 01-4025 Mobile Language Study Final...smart card applications. Smart cards can be programmed using general-purpose languages ; but because of their limited resources, smart card programs

  3. MELD: A Logical Approach to Distributed and Parallel Programming

    DTIC Science & Technology

    2012-03-01

    0215 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT NUMBER 61101E 6. AUTHOR(S) Seth Copen Goldstein Flavio Cruz 5d. PROJECT NUMBER BI20 5e. TASK...Comp. Sci., vol. 50, pp. 1–102, 1987. [33] P. Ló pez, F. Pfenning, J. Polakow, and K. Watkins , “Monadic concurrent linear logic programming,” in

  4. IGDS/TRAP Interface Program (ITIP). Software User Manual (SUM). [network flow diagrams for coal gasification studies

    NASA Technical Reports Server (NTRS)

    Jefferys, S.; Johnson, W.; Lewis, R.; Rich, R.

    1981-01-01

    This specification establishes the requirements, concepts, and preliminary design for a set of software known as the IGDS/TRAP Interface Program (ITIP). This software provides the capability to develop at an Interactive Graphics Design System (IGDS) design station process flow diagrams for use by the NASA Coal Gasification Task Team. In addition, ITIP will use the Data Management and Retrieval System (DMRS) to maintain a data base from which a properly formatted input file to the Time-Line and Resources Analysis Program (TRAP) can be extracted. This set of software will reside on the PDP-11/70 and will become the primary interface between the Coal Gasification Task Team and IGDS, DMRS, and TRAP. The user manual for the computer program is presented.

  5. Eyes on Target: Intelligence Support to an Effects-based Approach

    DTIC Science & Technology

    2007-01-01

    and theoretical support for such techniques is available from the field of neurolinguistic programming ,21 which involves analysis of word choice...Approach 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7

  6. Training anesthesiology residents in providing anesthesia for awake craniotomy: learning curves and estimate of needed case load.

    PubMed

    Bilotta, Federico; Titi, Luca; Lanni, Fabiana; Stazi, Elisabetta; Rosa, Giovanni

    2013-08-01

    To measure the learning curves of residents in anesthesiology in providing anesthesia for awake craniotomy, and to estimate the case load needed to achieve a "good-excellent" level of competence. Prospective study. Operating room of a university hospital. 7 volunteer residents in anesthesiology. Residents underwent a dedicated training program of clinical characteristics of anesthesia for awake craniotomy. The program was divided into three tasks: local anesthesia, sedation-analgesia, and intraoperative hemodynamic management. The learning curve for each resident for each task was recorded over 10 procedures. Quantitative assessment of the individual's ability was based on the resident's self-assessment score and the attending anesthesiologist's judgment, and rated by modified 12 mm Likert scale, reported ability score visual analog scale (VAS). This ability VAS score ranged from 1 to 12 (ie, very poor, mild, moderate, sufficient, good, excellent). The number of requests for advice also was recorded (ie, resident requests for practical help and theoretical notions to accomplish the procedures). Each task had a specific learning rate; the number of procedures necessary to achieve "good-excellent" ability with confidence, as determined by the recorded results, were 10 procedures for local anesthesia, 15 to 25 procedures for sedation-analgesia, and 20 to 30 procedures for intraoperative hemodynamic management. Awake craniotomy is an approach used increasingly in neuroanesthesia. A dedicated training program based on learning specific tasks and building confidence with essential features provides "good-excellent" ability. © 2013 Elsevier Inc. All rights reserved.

  7. Recovery. Oxygen Transport Membrane-Based OxyCombustion for CO 2 Capture from Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Sean; Geary, Joan; Chakravrti, Shrikar

    2015-12-22

    This Final report documents and summarizes all of the work performed for the DOE award DE-FC26-07NT43088 during the period from April 2007 - June 2012. This report outlines accomplishments for the following tasks: Task 1 – Process and Systems Engineering, Task 2 – OTM Performance Improvement, Task 3 – OTM Manufacturing Development, Task 4 - Laboratory Scale Testing and Task 5 – Project Management.

  8. Role delineation study for the American Society for Pain Management Nursing.

    PubMed

    Willens, Joyce S; DePascale, Christine; Penny, James

    2010-06-01

    A role delineation study, or job analysis, is a necessary step in the development of a quality credentialing program. The process requires a logical approach and systematic methods to have an examination that is legally defensible. There are three main phases: initial development and evaluation, validation study, and development of test specifications. In the first phase, the content expert panel discussed performance domains that exist in pain management nursing. The six domains developed were: 1) assessment, monitoring, and evaluation of pain; 2) pharmacologic pain management; 3) nonpharmacologic pain management; 4) therapeutic communication and counseling; 5) patient and family teaching; and 6) collaborative and organizational activities. The panel then produced a list of 70 task statements to develop an online survey which was sent to independent reviewers with expertise in pain management nursing. After the panel reviewed the results of the pilot test, it was decided to clarify a few items that did not perform as expected. After the questionnaire was finalized it was distributed to 1,500 pain management nurses. The final yield was 585 usable returns, for a response rate of 39%. Thirty-three percent of the respondents reported a bachelor's degree in nursing as the highest degree awarded. Over 80% indicated that they were certified in pain management. Over 35% reported working in a staff position, 14% as a nurse practitioner, and 13% as a clinical nurse specialist. Part of the questionnaire asked the participants to rate performance expectation, consequence or the likelihood that the newly certified pain management nurse could cause harm, and the frequency of how often that nurse performs in each of the performance domains. The performance expectation was rated from 0 (the newly certified pain management nurse was not at all expected to perform the domain task) to 2 (after 6 months the newly certified pain management nurse would be expected to perform the domain task). The consequences of the degree would be the inability of the newly certified pain management nurse to perform duties or tasks in each domain was rated from 0 (no harm) to 4 (extreme harm). The first domain received the highest average frequency rating. The pharmacologic domain received the highest mean rating on consequence. The reliability of all scales was 0.95 or higher, which indicated that the questionnaire consistently measured what it was intended to measure. The quality of the questionnaire is an indicator that certification is one measure of nursing excellence. (c) 2010 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.

  9. Towards an Artificial Space Object Taxonomy

    DTIC Science & Technology

    2013-09-01

    demonstrate how to implement this taxonomy in Figaro, an open source probabilistic programming language. 2. INTRODUCTION Currently, US Space Command...Taxonomy 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7...demonstrate how to implement this taxonomy in Figaro, an open source probabilistic programming language. 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF

  10. Cockpit data management

    NASA Technical Reports Server (NTRS)

    Groce, J. L.; Boucek, G. P.

    1988-01-01

    This study is a continuation of an FAA effort to alleviate the growing problems of assimilating and managing the flow of data and flight related information in the air transport flight deck. The nature and extent of known pilot interface problems arising from new NAS data management programs were determined by a comparative timeline analysis of crew tasking requirements. A baseline of crew tasking requirements was established for conventional and advanced flight decks operating in the current NAS environment and then compared to the requirements for operation in a future NAS environment emphasizing Mode-S data link and TCAS. Results showed that a CDU-based pilot interface for Mode-S data link substantially increased crew visual activity as compared to the baseline. It was concluded that alternative means of crew interface should be available during high visual workload phases of flight. Results for TCAS implementation showed substantial visual and motor tasking increases, and that there was little available time between crew tasks during a TCAS encounter. It was concluded that additional research should be undertaken to address issues of ATC coordination and the relative benefit of high workload TCAS features.

  11. Afghan Customs: U.S. Programs Have Had Some Successes, but Challenges Will Limit Customs Revenue as a Sustainable Source of Income for Afghanistan

    DTIC Science & Technology

    2014-04-01

    TAFA II programs from November 2009 through August 2013. These programs were followed by the Afghanistan Trade and Revenue ( ATAR ) program as a...successor program—the Afghanistan Trade and Revenue ( ATAR ) program, which started in November 2013. CBP has administered the Border Management Task... ATAR contract documents as important anti-corruption measures, SIGAR found that the ATAR contract does not require the implementing partner to meet

  12. SafetyAnalyst Testing and Implementation

    DOT National Transportation Integrated Search

    2009-03-01

    SafetyAnalyst is a software tool developed by the Federal Highway Administration to assist state and local transportation agencies on analyzing safety data and managing their roadway safety programs. This research report documents the major tasks acc...

  13. Software Schedules Missions, Aids Project Management

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  14. [New professional field in France: Analysis of the training needs of case managers].

    PubMed

    Somme, Dominique; Corvol, Aline; Couturier, Yves; Pimouguet, Clément; Moreau, Olivier; Perivier, Samuel; Balard, Frédéric; de Stampa, Matthieu

    2015-01-01

    Case management is a relatively new career field in France. It was first introduced on an experimental basis in 2007-2008, and was then developedfollowing the National Alzheimer Plan and finally enshrined in legislation in 2012. This careerfield is based on a set of tasks widely described internationally: identifying the right level of intervention, standardized multidimensional assessment, planning all aid (care and social services), implementation of the plan, monitoring and reassessment and periodic reassessment of all needs in a continuous and long-term process. The specific, systematic and dedicated nature of these tasks to these tasks makes training essential. Regulations also stipulate that the professional must acquire additional training by a dedicated inter-university degree. This requirement is a French specificity The authors present the history of case management and training in France and analyze the various international training frameworks identified by an Internet search. Moreover, based on the opinions expressed by case managers at different times of the scientific assessment and a review ofseveral studies conducted by inter-university case management program students, this article highlights the specific training needs of case managers and how the proposed training can meet these needs.

  15. A Comparative Study of the Navy Project Manager and His Civilian Counterpart in Industry

    DTIC Science & Technology

    1976-03-01

    Navy project manager and his civilian counterpart in industry. Sushka, Peter William Monterey, California. Naval Postgraduate School http...Wi 1 1 iam Sushka NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS A COMPARATIVE STUDY OF THE NAVY PROJECT MANAGER AND HIS CIVILIAN COUNTERPART IN...OR GRANT NUMBERfa; 9. PERFORMING ORGANIZATION NAME AND ADDRESS Naval Postgraduate School Monterey, California 93940 10. PROGRAM ELEMENT, PROJECT. TASK

  16. Office of Nuclear Energy Knowledge Management Program Situational Analysis Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kimberlyn C. Mousseau

    2011-12-01

    Knowledge management (KM) has been a high priority for the Department of Energy (DOE) Office of Nuclear Energy (NE) for the past several years. NE Programs are moving toward well-established knowledge management practices and a formal knowledge management program has been established. Knowledge management is being practiced to some level within each of the NE programs. Although it continues to evolve as NE programs evolve, a formal strategic plan that guides the implementation of KM has been developed. Despite the acceptance of KM within DOE NE, more work is necessary before the NE KM program can be considered fully successful.more » Per Dr. David J. Skyrme[1], an organization typically moves through the following evolutionary phases: (1) Ad-hoc - KM is being practiced to some level in some parts of the organization; (2) Formal - KM is established as a formal project or program; (3) Expanding - the use of KM as a discipline grows in practice across different parts of the organization; (4) Cohesive - there is a degree of coordination of KM; (5) Integrated - there are formal standards and approaches that give every individual access to most organizational knowledge through common interfaces; and (6) Embedded - KM is part-and-parcel of everyday tasks; it blends seamlessly into the background. According to the evolutionary phases, the NE KM program is operating at the two lower levels, Ad-hoc and Formal. Although KM is being practiced to some level, it is not being practiced in a consistent manner across the NE programs. To be fully successful, more emphasis must be placed on establishing KM standards and processes for collecting, organizing, sharing and accessing NE knowledge. Existing knowledge needs to be prioritized and gathered on a routine basis, its existence formally recorded in a knowledge inventory. Governance to ensure the quality of the knowledge being used must also be considered. For easy retrieval, knowledge must be organized according to a taxonomy that mimics nuclear energy programs. Technologies need to be established to make accessing the knowledge easier for the user. Finally, knowledge needs to be used as part of a well defined work process.« less

  17. Investigating Interruptions: Implications for Flightdeck Performance

    NASA Technical Reports Server (NTRS)

    Latorella, Kara A.

    1999-01-01

    A fundamental aspect of multiple task management is attending to new stimuli and integrating associated task requirements into an ongoing task set; this is "interruption management" (IM). Anecdotal evidence and field studies indicate the frequency and consequences of interruptions, however experimental investigations of mechanisms influencing IM are scarce. Interruptions on commercial flightdecks are numerous, of various forms, and have been cited as contributing factors in many aviation incident and accident reports. This research grounds an experimental investigation of flightdeck interruptions in a proposed IM stage model. This model organizes basic research, identifies influencing mechanisms, and suggests appropriate dependent measures for IM. Fourteen airline pilots participated in a flightdeck simulation experiment to investigate the general effects of performing an interrupting task and interrupted procedure, and the effects of specific task factors: (1) modality; (2) embeddedness, or goal-level, of an interruption; (3) strength of association, or coupling-strength, between interrupted tasks; (4) semantic similarity; and (5) environmental stress. General effects of interruptions were extremely robust. All individual task factors significantly affected interruption management, except "similarity." Results extend the Interruption Management model, and are interpreted for their implications for interrupted flightdeck performance and intervention strategies for mitigating their effects on the flightdeck.

  18. Single-Pilot Workload Management

    NASA Technical Reports Server (NTRS)

    Rogers, Jason; Williams, Kevin; Hackworth, Carla; Burian, Barbara; Pruchnicki, Shawn; Christopher, Bonny; Drechsler, Gena; Silverman, Evan; Runnels, Barry; Mead, Andy

    2013-01-01

    Integrated glass cockpit systems place a heavy cognitive load on pilots (Burian Dismukes, 2007). Researchers from the NASA Ames Flight Cognition Lab and the FAA Flight Deck Human Factors Lab examined task and workload management by single pilots. This poster describes pilot performance regarding programming a reroute while at cruise and meeting a waypoint crossing restriction on the initial descent.

  19. Programme Costing - A Logical Step Toward Improved Management.

    ERIC Educational Resources Information Center

    McDougall, Ronald N.

    The analysis of costs of university activities from a functional or program point of view, rather than an organizational unit basis, is not only an imperative for the planning and management of universities, but also a logical method of examing the costs of university operations. A task force of the Committee of Finance Officers-Universities of…

  20. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  1. Estimating the Efficiency of Therapy Groups in a College Counseling Center

    ERIC Educational Resources Information Center

    Weatherford, Ryan D.

    2017-01-01

    College counseling centers are facing rapidly increasing demands for services and are tasked to find efficient ways of providing adequate services while managing limited space. The use of therapy groups has been proposed as a method of managing demand. This brief report examines the clinical time savings of a traditional group therapy program in a…

  2. A Critical Analysis of Management Indicators for the Director of Materiel Management, Sacramento ALC.

    DTIC Science & Technology

    1980-06-01

    Dist. AVAIL, and/or SP A Re aw rade tostt.on Organizatin iL.cti *~ NO OSTAGI PtN*V FORn PffVA13 Ut.SIL $3- -. dil -- T I BUSINESS REPLY MAIL... Leadership Qualities Provide Quality Training Programs Establish Realistic Project and Task Priorities Minimize Not Mission Capable Supply (NMCS) 47 zz

  3. French Interim MALE UAV Program

    DTIC Science & Technology

    2003-09-02

    MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS

  4. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-11-20

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK...Another press report (Katherine McIntire Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September...whether the schedule for procuring CG(X)s is properly aligned with foreign-country ballistic missile development programs. A 2005 defense trade

  5. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-10-21

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK...Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008) quoted Admiral Gary Roughead, the...related question is whether the schedule for procuring CG(X)s is properly aligned with foreign-country ballistic missile development programs. A 2005

  6. Radar Resource Management in a Dense Target Environment

    DTIC Science & Technology

    2014-03-01

    problem faced by networked MFRs . While relaxing our assumptions concerning information gain presents numerous challenges worth exploring, future research...linear programming MFR multifunction phased array radar MILP mixed integer linear programming NATO North Atlantic Treaty Organization PDF probability...1: INTRODUCTION Multifunction phased array radars ( MFRs ) are capable of performing various tasks in rapid succession. The performance of target search

  7. Dip Process Thermal Barrier Coating for Superalloys.

    DTIC Science & Technology

    1982-02-02

    Washington DC 20332 Attention: Captain Steven G. Wax Program Manager ’. ~ Electronic and Material Sciences Contract F49630-81 - K -0009 𔃺 SRI Project...81- K -0009 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT. TASK SRI International AREA WORK UNIT NUMBERS 333 Ravenswood...A. Background ........ 0...................0................... B . Objectives ............ . ................ .............. 2 C. Sumry of Work: Year

  8. Strategies for Effective Orientation, Training, and Management of Media Center Volunteers.

    ERIC Educational Resources Information Center

    Dale, Carol A.

    The purpose of this practicum was to develop a program for volunteers in an elementary school media center that allowed volunteers to be more independent from the media specialist. Phase I of the program, highlighting school volunteers as Target Group I, included a questionnaire, interviews, delegation of specific tasks, a posted duty roster, an…

  9. The reality of task shifting in medicines management- a case study from Tanzania.

    PubMed

    Wiedenmayer, Karin A; Kapologwe, Ntuli; Charles, James; Chilunda, Fiona; Mapunjo, Siana

    2015-01-01

    Tanzania suffers a severe shortage of pharmaceutical staff. This negatively affects the provision of pharmaceutical services and access to medicines, particularly in rural areas. Task shifting has been proposed as a way to mitigate the impact of health worker shortfalls.The aim of this study was to understand the context and extent of task shifting in pharmaceutical management in Dodoma Region, Tanzania. We explored 1) the number of trained pharmaceutical staff as compared to clinical cadres managing medicines, 2) the national establishment for staffing levels, 3) job descriptions, 4) supply management training conducted and 5) availability of medicines and adherence to Good Storage Practice. A cross-sectional study was conducted in 270 public health facilities in 2011. A pre-tested questionnaire was administered to the person in charge of the facility to collect data on staff employed and their respective pharmaceutical tasks. Availability of 26 tracer medicines and adherence to Good Storage Practice guidelines was surveyed by direct observation. The national establishments for pharmaceutical staffing levels and job descriptions of facility cadres were analysed. While required staffing levels in 1999 were 50, the region employed a total of only 14 pharmaceutical staff in 2011. Job descriptions revealed that, next to pharmaceutical staff, only nurses were required to provide dispensing services and adherence counselling. In 95.5% of studied health facilities medicines management was done by non-pharmaceutically trained cadres, predominantly medical attendants. The first training on supply management was provided in 2005 with no refresher training thereafter. Mean availability of tracer medicines was 53%, while 56% of health facilities fully met criteria of Good Storage Practice. Task shifting is a reality in the pharmaceutical sector in Tanzania and it occurs mainly as a coping mechanism rather than a formal response to the workforce crisis. In Dodoma Region, pharmacy-related tasks and supply management have informally been shifted to clinical staff without policy guidance, explicit job descriptions, and without the necessary support through training. Implicit task shifting should be recognized and formalized. Job orientation, training and operational procedures may be useful to support non-pharmaceutical health workers to effectively manage medicine supply.

  10. Low-Cost, Net-Shape Ceramic Radial Turbine Program

    DTIC Science & Technology

    1985-05-01

    PROGRAM ELEMENT. PROJECT. TASK Garrett Turbine Engine Company AE OKUI UBR 111 South 34th Street, P.O. Box 2517 Phoenix, Arizona 85010 %I. CONTROLLING...processing iterations. Program management and materials characterization were conducted at Garrett Turbine Engine Company (GTEC), test bar and rotor...automotive gas turbine engine rotor development efforts at ACC. xvii PREFACE This is the final technical report of the Low-Cost, Net- Shape Ceramic

  11. CELLFS: TAKING THE "DMA" OUT OF CELL PROGRAMMING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IONKOV, LATCHESAR A.; MIRTCHOVSKI, ANDREY A.; NYRHINEN, AKI M.

    In this paper we present a new programming model for the Cell BE architecture of scalar multiprocessors. They call this programming model CellFS. CellFS aims at simplifying the task of managing I/O between the local store of the processing units and main memory. The CellFS support library provides the means for transferring data via simple file I/O operations between the PPU and the SPU.

  12. Program definition and assessment overview. [for thermal energy storage project management

    NASA Technical Reports Server (NTRS)

    Gordon, L. H.

    1980-01-01

    The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.

  13. Automation-induced monitoring inefficiency: role of display location.

    PubMed

    Singh, I L; Molloy, R; Parasuraman, R

    1997-01-01

    Operators can be poor monitors of automation if they are engaged concurrently in other tasks. However, in previous studies of this phenomenon the automated task was always presented in the periphery, away from the primary manual tasks that were centrally displayed. In this study we examined whether centrally locating an automated task would boost monitoring performance during a flight-simulation task consisting of system monitoring, tracking and fuel resource management sub-tasks. Twelve nonpilot subjects were required to perform the tracking and fuel management tasks manually while watching the automated system monitoring task for occasional failures. The automation reliability was constant at 87.5% for six subjects and variable (alternating between 87.5% and 56.25%) for the other six subjects. Each subject completed four 30 min sessions over a period of 2 days. In each automation reliability condition the automation routine was disabled for the last 20 min of the fourth session in order to simulate catastrophic automation failure (0 % reliability). Monitoring for automation failure was inefficient when automation reliability was constant but not when it varied over time, replicating previous results. Furthermore, there was no evidence of resource or speed accuracy trade-off between tasks. Thus, automation-induced failures of monitoring cannot be prevented by centrally locating the automated task.

  14. Automation-induced monitoring inefficiency: role of display location

    NASA Technical Reports Server (NTRS)

    Singh, I. L.; Molloy, R.; Parasuraman, R.

    1997-01-01

    Operators can be poor monitors of automation if they are engaged concurrently in other tasks. However, in previous studies of this phenomenon the automated task was always presented in the periphery, away from the primary manual tasks that were centrally displayed. In this study we examined whether centrally locating an automated task would boost monitoring performance during a flight-simulation task consisting of system monitoring, tracking and fuel resource management sub-tasks. Twelve nonpilot subjects were required to perform the tracking and fuel management tasks manually while watching the automated system monitoring task for occasional failures. The automation reliability was constant at 87.5% for six subjects and variable (alternating between 87.5% and 56.25%) for the other six subjects. Each subject completed four 30 min sessions over a period of 2 days. In each automation reliability condition the automation routine was disabled for the last 20 min of the fourth session in order to simulate catastrophic automation failure (0 % reliability). Monitoring for automation failure was inefficient when automation reliability was constant but not when it varied over time, replicating previous results. Furthermore, there was no evidence of resource or speed accuracy trade-off between tasks. Thus, automation-induced failures of monitoring cannot be prevented by centrally locating the automated task.

  15. Self-efficacy and dietary fat reduction behaviors in obese African-American and white mothers.

    PubMed

    Chang, Mei-Wei; Brown, Roger L; Baumann, Linda J; Nitzke, Susan A

    2008-05-01

    This study examined the influence of weight management and education on five types of fat reduction behaviors mediated through three task-specific domains of self-efficacy among young, low-income obese African-American and white mothers. It also investigated interaction of race with the relationships between weight management, education, self-efficacy, and fat reduction behaviors. A sample of obese African-American and white mothers was recruited from the Special Supplemental Nutrition Program for Women, Infants, and Children (WIC) in Wisconsin. Participants reported their weight management status, education, self-efficacy for eating low-fat food, and fat reduction behaviors. For both racial groups, weight management status predicted low-fat food substitution and meat modification behaviors; education predicted meat modification behavior. Three task-specific domains of self-efficacy (negative mood, positive mood, and food availability) predicted different types of fat reduction behaviors and differed by race. Weight management influenced behaviors of low-fat food substitution, meat modification, and fried-food avoidance, mediated partially through self-efficacies of negative mood (African Americans), positive mood (African Americans, whites), and food availability (African Americans). Race affected the relationships between weight management, education, three task-specific domains of self-efficacy, and five types of fat reduction behaviors. Self-efficacies operated differentially for African Americans and whites. Thus, strategies to address specific fat reduction behaviors have the potential to be more effective when tailored to specific individual characteristics such as racial background, history of weight management strategies and task-specific domains of self-efficacy.

  16. Program on Earth Observation Data Management Systems (EODMS)

    NASA Technical Reports Server (NTRS)

    Eastwood, L. F., Jr.; Gohagan, J. K.; Hill, C. T.; Morgan, R. P.; Hays, T. R.; Ballard, R. J.; Crnkovick, G. R.; Schaeffer, M. A.

    1976-01-01

    An assessment was made of the needs of a group of potential users of satellite remotely sensed data (state, regional, and local agencies) involved in natural resources management in five states, and alternative data management systems to satisfy these needs are outlined. Tasks described include: (1) a comprehensive data needs analysis of state and local users; (2) the design of remote sensing-derivable information products that serve priority state and local data needs; (3) a cost and performance analysis of alternative processing centers for producing these products; (4) an assessment of the impacts of policy, regulation and government structure on implementing large-scale use of remote sensing technology in this community of users; and (5) the elaboration of alternative institutional arrangements for operational Earth Observation Data Management Systems (EODMS). It is concluded that an operational EODMS will be of most use to state, regional, and local agencies if it provides a full range of information services -- from raw data acquisition to interpretation and dissemination of final information products.

  17. Patrick Air Force Base integrated resource assessment. Volume 1, Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandusky, W.F.; Wahlstrom, R.R.

    1994-03-01

    Some of the most difficult problems encountered at federal sites in reducing energy consumption in a cost-effective manner revolve around understanding where energy is being used and what technologies can be employed to decrease energy use. Many large federal sites have one or two meters to track electric energy use for several thousand buildings and numerous industrial processes. Even where meters are available on individual buildings or family housing units, the meters are not consistently read. When the federal energy manager has been able to identify high energy users, the energy manager may not have the background, training, or resourcesmore » to determine the most cost-effective options for reducing this energy use. This limitation can lead to selection of suboptimal projects that prevent the site from achieving full life-cycle cost savings. The USDOE Federal Energy Management Program has been tasked by the US Air Force Space Command to identify, evaluate, and acquire all cost-effective energy projects at selected federal facilities. This is part of a model program developed to provide a systematic approach to evaluating energy opportunities. The program (1) identifies the building groups and end uses using the most energy (not just having the greatest energy-use intensity) and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. This model program provides the federal energy manager with a road map to significantly reduce energy use in a planned, rational, cost-effective fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a 5- to 10-year energy management plan.« less

  18. Local Flood Proofing Programs

    DTIC Science & Technology

    2005-02-01

    Carolina, funded its flood audits and other flood protection projects with stormwater utility income. Impact fees: Impact fees are contributions...determining appropriate projects . Local Flood Proofing Programs – 68 – February 2005 Bolingbrook’s Flood Audit Bolingbrook, Illinois, has used different...GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND

  19. 'I believe high blood pressure can kill me:' using the PEN-3 Cultural Model to understand patients' perceptions of an intervention to control hypertension in Ghana.

    PubMed

    Blackstone, Sarah; Iwelunmor, Juliet; Plange-Rhule, Jacob; Gyamfi, Joyce; Quakyi, Nana Kofi; Ntim, Micheal; Addison, Abigail; Ogedegbe, Gbenga

    2017-07-04

    Currently in Ghana, there is an on-going task-shifting strategy in which nurses are trained in hypertension management. While this study will provide useful information on the viability of this approach, it is not clear how patients in the intervention perceive hypertension, the task-shifting strategy, and its effects on blood pressure management. The objective of this paper is to examine patients' perceptions of hypertension and hypertension management in the context of an on-going task-shifting intervention to manage blood pressure control in Ghana. Forty-two patients participating in the Task Shifting Strategy for Hypertension program (23 males, 19 females, and mean age 61. 7 years) completed in-depth, qualitative interviews. Interviews were transcribed, and key words and phrases were extracted and coded using the PEN-3 Cultural Model as a guide through open and axial coding techniques, thus allowing rich exploration of the data. Emergent themes included patients' perceptions of hypertension, which encompassed misperceptions of hypertension and blood pressure control. Additional themes included enablers and barriers to hypertension management, and how the intervention nurtured lifestyle change associated with blood pressure control. Primary enabling factors included the supportive nature of TASSH nurses, while notable barriers were financial constraints and difficulty accessing medication. Nurturing factors included the motivational interviewing and patient counseling which instilled confidence in the patients that they could make lasting behavior changes. This study offers a unique perspective of blood pressure control by examining how patients view an on-going task-shifting initiative for hypertension management. The results of this study shed light on factors that can help and hinder individuals in low-resource settings with long-term blood pressure management.

  20. 6 CFR 29.5 - Requirements for protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PCII Program Manager or the PCII Program Manager's designee; (2) The information is submitted for... information initially provided received by the PCII Program Manager or the PCII Program Manager's designee... provided, to be received by the PCII Program Manager or the PCII Program Manager's designee within a...

  1. After-effects of human-computer interaction indicated by P300 of the event-related brain potential.

    PubMed

    Trimmel, M; Huber, R

    1998-05-01

    After-effects of human-computer interaction (HCI) were investigated by using the P300 component of the event-related brain potential (ERP). Forty-nine subjects (naive non-users, beginners, experienced users, programmers) completed three paper/pencil tasks (text editing, solving intelligence test items, filling out a questionnaire on sensation seeking) and three HCI tasks (text editing, executing a tutor program or programming, playing Tetris). The sequence of 7-min tasks was randomized between subjects and balanced between groups. After each experimental condition ERPs were recorded during an acoustic discrimination task at F3, F4, Cz, P3 and P4. Data indicate that: (1) mental after-effects of HCI can be detected by P300 of the ERP; (2) HCI showed in general a reduced amplitude; (3) P300 amplitude varied also with type of task, mainly at F4 where it was smaller after cognitive tasks (intelligence test/programming) and larger after emotion-based tasks (sensation seeking/Tetris); (4) cognitive tasks showed shorter latencies; (5) latencies were widely location-independent (within the range of 356-358 ms at F3, F4, P3 and P4) after executing the tutor program or programming; and (6) all observed after-effects were independent of the user's experience in operating computers and may therefore reflect short-term after-effects only and no structural changes of information processing caused by HCI.

  2. Selective Optimization

    DTIC Science & Technology

    2015-07-06

    NUMBER 5b. GRANT NUMBER AFOSR FA9550-12-1-0154 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Shabbir Ahmed and Santanu S. Dey 5d. PROJECT NUMBER 5e. TASK...standard mixed-integer programming (MIP) formulations of selective optimization problems. While such formulations can be attacked by commercial...F33615-86-C-5169. 5b. GRANT NUMBER. Enter all grant numbers as they appear in the report, e.g. AFOSR-82-1234. 5c. PROGRAM ELEMENT NUMBER. Enter

  3. Systems Engineering Technical Leadership Development Program

    DTIC Science & Technology

    2012-08-30

    technology-based competitive advantage can be part of firm’s business strategy.  Review the Porter Model . Return to Syllabus UNCLASSIFIED 66...Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7...PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Stevens Institute of Technology,Systems Engineering Research Center,Castle Point on the Hudson,Hoboken,NJ

  4. Case management's value is finally recognized. What happens now? .

    PubMed

    2015-10-01

    In recent years, case management has been recognized as a key in improving healthcare quality and reducing costs, but while hospitals are giving case managers more responsibilities, many administrators are not approving an increase in staff to handle the extra work. Case managers can help their hospital succeed with the Centers for Medicare & Medicaid Services' Value-based Purchasing program, the readmission reduction program, and bundled payments. Case management directors should make sure the hospital's senior leadership understands the roles and responsibilities of case managers and how their interventions can affect outcomes and the bottom line. The number of caseloads depends on the case management model, the responsibilities of case managers, and whether they have assistants or case management extenders who can take over some tasks and allow the licensed staff to work at the top of their licenses. Don't let technology replace communication and patient-centered interactions.

  5. Computerized training management system

    DOEpatents

    Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

    1998-08-04

    A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

  6. Computerized training management system

    DOEpatents

    Rice, Harold B.; McNair, Robert C.; White, Kenneth; Maugeri, Terry

    1998-08-04

    A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

  7. Channel Access in Erlang

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nicklaus, Dennis J.

    2013-10-13

    We have developed an Erlang language implementation of the Channel Access protocol. Included are low-level functions for encoding and decoding Channel Access protocol network packets as well as higher level functions for monitoring or setting EPICS process variables. This provides access to EPICS process variables for the Fermilab Acnet control system via our Erlang-based front-end architecture without having to interface to C/C++ programs and libraries. Erlang is a functional programming language originally developed for real-time telecommunications applications. Its network programming features and list management functions make it particularly well-suited for the task of managing multiple Channel Access circuits and PVmore » monitors.« less

  8. Processing sequence annotation data using the Lua programming language.

    PubMed

    Ueno, Yutaka; Arita, Masanori; Kumagai, Toshitaka; Asai, Kiyoshi

    2003-01-01

    The data processing language in a graphical software tool that manages sequence annotation data from genome databases should provide flexible functions for the tasks in molecular biology research. Among currently available languages we adopted the Lua programming language. It fulfills our requirements to perform computational tasks for sequence map layouts, i.e. the handling of data containers, symbolic reference to data, and a simple programming syntax. Upon importing a foreign file, the original data are first decomposed in the Lua language while maintaining the original data schema. The converted data are parsed by the Lua interpreter and the contents are stored in our data warehouse. Then, portions of annotations are selected and arranged into our catalog format to be depicted on the sequence map. Our sequence visualization program was successfully implemented, embedding the Lua language for processing of annotation data and layout script. The program is available at http://staff.aist.go.jp/yutaka.ueno/guppy/.

  9. Object-oriented sequence analysis: SCL--a C++ class library.

    PubMed

    Vahrson, W; Hermann, K; Kleffe, J; Wittig, B

    1996-04-01

    SCL (Sequence Class Library) is a class library written in the C++ programming language. Designed using object-oriented programming principles, SCL consists of classes of objects performing tasks typically needed for analyzing DNA or protein sequences. Among them are very flexible sequence classes, classes accessing databases in various formats, classes managing collections of sequences, as well as classes performing higher-level tasks like calculating a pairwise sequence alignment. SCL also includes classes that provide general programming support, like a dynamically growing array, sets, matrices, strings, classes performing file input/output, and utilities for error handling. By providing these components, SCL fosters an explorative programming style: experimenting with algorithms and alternative implementations is encouraged rather than punished. A description of SCL's overall structure as well as an overview of its classes is given. Important aspects of the work with SCL are discussed in the context of a sample program.

  10. Stanford Chronic Disease Self-Management Program in myotonic dystrophy: New opportunities for occupational therapists: Stanford Chronic Disease Self-Management Program dans la dystrophie myotonique : De nouvelles opportunités pour les ergothérapeutes.

    PubMed

    Raymond, Kateri; Levasseur, Mélanie; Chouinard, Maud-Christine; Mathieu, Jean; Gagnon, Cynthia

    2016-06-01

    Chronic disease self-management is a priority in health care. Personal and environmental barriers for populations with neuromuscular disorders might diminish the efficacy of self-management programs, although they have been shown to be an effective intervention in many populations. Owing to their occupational expertise, occupational therapists might optimize self-management program interventions. This study aimed to adapt the Stanford Chronic Disease Self-Management Program (CDSMP) for people with myotonic dystrophy type 1 (DM1) and assess its acceptability and feasibility in this population. Using an adapted version of the Stanford CDSMP, a descriptive pilot study was conducted with 10 participants (five adults with DM1 and their caregivers). A semi-structured interview and questionnaires were used. The Stanford CDSMP is acceptable and feasible for individuals with DM1. However, improvements are required, such as the involvement of occupational therapists to help foster concrete utilization of self-management strategies into day-to-day tasks using their expertise in enabling occupation. Although adaptations are needed, the Stanford CDSMP remains a relevant intervention with populations requiring the application of self-management strategies. © CAOT 2016.

  11. Global Ground Motion Prediction Equations Program | Just another WordPress

    Science.gov Websites

    Motion Task 2: Compile and Critically Review GMPEs Task 3: Select or Derive a Global Set of GMPEs Task 6 : Design the Specifications to Compile a Global Database of Soil Classification Task 5: Build a Database of Update on PEER's Global GMPEs Project from recent workshop in Turkey Posted on June 11, 2012 During May

  12. SPIRE Data-Base Management System

    NASA Technical Reports Server (NTRS)

    Fuechsel, C. F.

    1984-01-01

    Spacelab Payload Integration and Rocket Experiment (SPIRE) data-base management system (DBMS) based on relational model of data bases. Data bases typically used for engineering and mission analysis tasks and, unlike most commercially available systems, allow data items and data structures stored in forms suitable for direct analytical computation. SPIRE DBMS designed to support data requests from interactive users as well as applications programs.

  13. Developing Program Management Leadership for Acquisition Reform

    DTIC Science & Technology

    2011-04-30

    mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program  Management   Leadership   for Acquisition Reform    The 8th Annual Acquisition Research Symposium Panel #20: Investing in People

  14. Space transfer vehicle concepts and requirements study. Volume 3: Program cost estimates. Book 2: WBS and dictionary

    NASA Technical Reports Server (NTRS)

    Peffley, A. F.

    1991-01-01

    This document describes the products and services to be developed, tested, produced, and operated for the Space Transfer Vehicle (STV) Program. The Work Breakdown Structure (WBS) and WBS Dictionary are program management tools used to catalog, account by task, and summarize work packages of a space system program. The products or services to be delivered or accomplished during the STV C/D phase are the primary focus of this work breakdown structure document.

  15. The Saturn management concept

    NASA Technical Reports Server (NTRS)

    Bilstein, R. E.

    1974-01-01

    Management of the Saturn launch vehicles was an evolutionary process, requiring constant interaction between NASA Headquarters, the Marshall Space Flight Center (particularly the Saturn 5 Program Office), and the various prime contractors. Successful Saturn management was a blend of the decades of experience of the von Braun team, management concepts from the Army, Navy, Air Force, and Government, and private industry. The Saturn 5 Program Office shared a unique relationship with the Apollo Program Office at NASA Headquarters. Much of the success of the Saturn 5 Program Office was based on its painstaking attention to detail, emphasis on individual responsibilities (backed up by comprehensive program element plans and management matrices), and a high degree of visibility as embodied in the Program Control Center.

  16. Deception in Program Evaluation Design

    DTIC Science & Technology

    2014-10-31

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Scott Cheney-Peters 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...stakeholders interested in assessments as a true reflection of a programâs state have a variety of methods at hand to mitigate their impacts. Even in...26. Cites attempts to manipulate the reception and understanding of findings on climate research and intelligence reports. 3 whether determining

  17. Modular space station phase B extension period executive summary

    NASA Technical Reports Server (NTRS)

    Tischler, A. A.; Could, C. L.

    1972-01-01

    A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

  18. FRAMEWORK FOR ENVIRONMENTAL MODELING AND ENVIRONMENTAL SECURITY ASSESSMENT MODELING IN SUPPORT OF THE GULF OF MEXICO PROGRAM

    EPA Science Inventory

    The primary purpose of this task is to serve as ORD liaison with USEPA's Gulf of Mexico Program Office. Liaison activities include 1) managing joint work between EPA and the US Navy; 2) serving as ORD lead for the RARE projects; 3) serving as a member of the State and Federal ta...

  19. Sustaining staff nurse support for a patient care ergonomics program in critical care.

    PubMed

    Haney, Linda L; Wright, Laurette

    2007-06-01

    Applying management concepts from marketing and business sources can assist critical care units with establishing a planned change in the way nurses perform manual handling tasks, and thus, help insure that it is sustained.

  20. An Assessment of Fiscal Year 2013 Beyond Yellow Ribbon Programs

    DTIC Science & Technology

    2015-01-01

    2013 Beyond Yellow Ribbon Programs 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER...5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) RAND Corporation,National Defense Research Institute,1776 Main Street, P.O...Box 2138,Santa Monica,CA,90407-2138 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR

  1. Multifunctional Battalion Task Force Training: Slovenian Armed Forces Battalion Training Cycle

    DTIC Science & Technology

    2016-06-10

    MULTIFUNCTIONAL BATTALION TASK FORCE TRAINING: SLOVENIAN ARMED FORCES BATTALION TRAINING CYCLE A thesis presented to...Forces Battalion Training Cycle 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Major Ales Avsec 5d...Bn TF) training cycle . It focuses on how the SAF is conducting the infantry and multifunctional Bn TF training. In particular, it deals with mission

  2. Leveraging Trade Agreements to Meet U.S. Security Aims

    DTIC Science & Technology

    2016-04-08

    TO MEET U.S. SECURITY AIMS 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Sd. PROJECT NUMBER LTC Allysa A. Kropp (USARNG) Se. TASK NUMBER 5f...Sanctions Programs and Country Information,” under “Resource Center, Financial Sanctions, Programs ,” https’.//wwiv.treasurv.gov/resource center/sanctions... Program , and economic integration of former adversaries through U.S. trade policy.7 In the National Security Strategy, President Obama underscored the

  3. Navy CG(X) Cruiser Program: Background for Congress

    DTIC Science & Technology

    2010-06-10

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008) quoted Admiral Gary Roughead, the Chief...procuring CG(X)s was properly aligned with foreign-country ballistic missile development programs. A 2005 defense trade press report, for example, stated

  4. Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A. Volume 14

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1998-01-01

    A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

  5. High Burnup Effects Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barner, J.O.; Cunningham, M.E.; Freshley, M.D.

    1990-04-01

    This is the final report of the High Burnup Effects Program (HBEP). It has been prepared to present a summary, with conclusions, of the HBEP. The HBEP was an international, group-sponsored research program managed by Battelle, Pacific Northwest Laboratories (BNW). The principal objective of the HBEP was to obtain well-characterized data related to fission gas release (FGR) for light water reactor (LWR) fuel irradiated to high burnup levels. The HBEP was organized into three tasks as follows: Task 1 -- high burnup effects evaluations; Task 2 -- fission gas sampling; and Task 3 -- parameter effects study. During the coursemore » of the HBEP, a program that extended over 10 years, 82 fuel rods from a variety of sources were characterized, irradiated, and then examined in detail after irradiation. The study of fission gas release at high burnup levels was the principal objective of the program and it may be concluded that no significant enhancement of fission gas release at high burnup levels was observed for the examined rods. The rim effect, an as yet unquantified contributor to athermal fission gas release, was concluded to be the one truly high-burnup effect. Though burnup enhancement of fission gas release was observed to be low, a full understanding of the rim region and rim effect has not yet emerged and this may be a potential area of further research. 25 refs., 23 figs., 4 tabs.« less

  6. Technical Facilities Management, Loan Pool, and Calibration

    NASA Technical Reports Server (NTRS)

    Smith, Jacob

    2011-01-01

    My work at JPL for the SURF program began on June 11, 2012 with the Technical Facilities Management group (TFM). As well as TFM, I worked with Loan Pool and Metrology to help them out with various tasks. Unlike a lot of other interns, I did not have a specific project rather many different tasks to be completed over the course of the 10 weeks.The first task to be completed was to sort through old certification reports in 6 different boxes to locate reports that needed to be archived into a digital database. There were no reports within these boxes that needed to be archived but rather were to be shredded. The reports went back to the early 1980's and up to the early 2000's. I was looking for reports dated from 2002 to 2012

  7. Multiple Intravenous Infusions Phase 2b: Laboratory Study

    PubMed Central

    Pinkney, Sonia; Fan, Mark; Chan, Katherine; Koczmara, Christine; Colvin, Christopher; Sasangohar, Farzan; Masino, Caterina; Easty, Anthony; Trbovich, Patricia

    2014-01-01

    Background Administering multiple intravenous (IV) infusions to a single patient via infusion pump occurs routinely in health care, but there has been little empirical research examining the risks associated with this practice or ways to mitigate those risks. Objectives To identify the risks associated with multiple IV infusions and assess the impact of interventions on nurses’ ability to safely administer them. Data Sources and Review Methods Forty nurses completed infusion-related tasks in a simulated adult intensive care unit, with and without interventions (i.e., repeated-measures design). Results Errors were observed in completing common tasks associated with the administration of multiple IV infusions, including the following (all values from baseline, which was current practice): setting up and programming multiple primary continuous IV infusions (e.g., 11.7% programming errors) identifying IV infusions (e.g., 7.7% line-tracing errors) managing dead volume (e.g., 96.0% flush rate errors following IV syringe dose administration) setting up a secondary intermittent IV infusion (e.g., 11.3% secondary clamp errors) administering an IV pump bolus (e.g., 11.5% programming errors) Of 10 interventions tested, 6 (1 practice, 3 technology, and 2 educational) significantly decreased or even eliminated errors compared to baseline. Limitations The simulation of an adult intensive care unit at 1 hospital limited the ability to generalize results. The study results were representative of nurses who received training in the interventions but had little experience using them. The longitudinal effects of the interventions were not studied. Conclusions Administering and managing multiple IV infusions is a complex and risk-prone activity. However, when a patient requires multiple IV infusions, targeted interventions can reduce identified risks. A combination of standardized practice, technology improvements, and targeted education is required. PMID:26316919

  8. Lessons Learned from Deploying an Analytical Task Management Database

    NASA Technical Reports Server (NTRS)

    O'Neil, Daniel A.; Welch, Clara; Arceneaux, Joshua; Bulgatz, Dennis; Hunt, Mitch; Young, Stephen

    2007-01-01

    Defining requirements, missions, technologies, and concepts for space exploration involves multiple levels of organizations, teams of people with complementary skills, and analytical models and simulations. Analytical activities range from filling a To-Be-Determined (TBD) in a requirement to creating animations and simulations of exploration missions. In a program as large as returning to the Moon, there are hundreds of simultaneous analysis activities. A way to manage and integrate efforts of this magnitude is to deploy a centralized database that provides the capability to define tasks, identify resources, describe products, schedule deliveries, and generate a variety of reports. This paper describes a web-accessible task management system and explains the lessons learned during the development and deployment of the database. Through the database, managers and team leaders can define tasks, establish review schedules, assign teams, link tasks to specific requirements, identify products, and link the task data records to external repositories that contain the products. Data filters and spreadsheet export utilities provide a powerful capability to create custom reports. Import utilities provide a means to populate the database from previously filled form files. Within a four month period, a small team analyzed requirements, developed a prototype, conducted multiple system demonstrations, and deployed a working system supporting hundreds of users across the aeros pace community. Open-source technologies and agile software development techniques, applied by a skilled team enabled this impressive achievement. Topics in the paper cover the web application technologies, agile software development, an overview of the system's functions and features, dealing with increasing scope, and deploying new versions of the system.

  9. Cockpit task management: A preliminary, normative theory

    NASA Technical Reports Server (NTRS)

    Funk, Ken

    1991-01-01

    Cockpit task management (CTM) involves the initiation, monitoring, prioritizing, and allocation of resources to concurrent tasks as well as termination of multiple concurrent tasks. As aircrews have more tasks to attend to due to reduced crew sizes and the increased complexity of aircraft and the air transportation system, CTM will become a more critical factor in aviation safety. It is clear that many aviation accidents and incidents can be satisfactorily explained in terms of CTM errors, and it is likely that more accidents induced by poor CTM practice will occur in the future unless the issue is properly addressed. The first step in understanding and facilitating CTM behavior was the development of a preliminary, normative theory of CTM which identifies several important CTM functions. From this theory, some requirements for pilot-vehicle interfaces were developed which are believed to facilitate CTM. A prototype PVI was developed which improves CTM performance and currently, a research program is under way that is aimed at developing a better understanding of CTM and facilitating CTM performance through better equipment and procedures.

  10. Multi-Mission Automated Task Invocation Subsystem

    NASA Technical Reports Server (NTRS)

    Cheng, Cecilia S.; Patel, Rajesh R.; Sayfi, Elias M.; Lee, Hyun H.

    2009-01-01

    Multi-Mission Automated Task Invocation Subsystem (MATIS) is software that establishes a distributed data-processing framework for automated generation of instrument data products from a spacecraft mission. Each mission may set up a set of MATIS servers for processing its data products. MATIS embodies lessons learned in experience with prior instrument- data-product-generation software. MATIS is an event-driven workflow manager that interprets project-specific, user-defined rules for managing processes. It executes programs in response to specific events under specific conditions according to the rules. Because requirements of different missions are too diverse to be satisfied by one program, MATIS accommodates plug-in programs. MATIS is flexible in that users can control such processing parameters as how many pipelines to run and on which computing machines to run them. MATIS has a fail-safe capability. At each step, MATIS captures and retains pertinent information needed to complete the step and start the next step. In the event of a restart, this information is retrieved so that processing can be resumed appropriately. At this writing, it is planned to develop a graphical user interface (GUI) for monitoring and controlling a product generation engine in MATIS. The GUI would enable users to schedule multiple processes and manage the data products produced in the processes. Although MATIS was initially designed for instrument data product generation,

  11. Inter-association task force recommendations on emergency preparedness and management of sudden cardiac arrest in high school and college athletic programs: a consensus statement.

    PubMed

    Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J

    2007-03-01

    To assist high school and college athletic programs prepare for and respond to sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. SCA is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishing an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of onsite responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.

  12. The Influence of Tactual Seat-motion Cues on Training and Performance in a Roll-axis Compensatory Tracking Task Setting

    DTIC Science & Technology

    2008-05-01

    AFRL-RH-WP-SR-2009-0002 The Influence of Tactual Seat-motion Cues on Training and Performance in a Roll-axis Compensatory Tracking Task...and Performance in a Roll-axis Compensatory Tracking Task Setting 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62202F 6. AUTHOR(S...simulated vehicle having aircraft-like dynamics. A centrally located compensatory display, subtending about nine degrees, provided visual roll error

  13. Nebraska Prostate Cancer Research Program

    DTIC Science & Technology

    2011-05-01

    is a multifunctional transmembrane receptor. The major function is to transport lysosome enzymes from where they are processed in the Golgi apparatus ...potential improvement for new students in the summer of 2011. Task 5: Announcement of the Year 2 Research Program (months 13-15) Done. Per...various research facilities and biotech companies. Currently, we are waiting for the arrival of the new students. Task 7: Summer Research (month 19

  14. Automated personnel data base system specifications, Task V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.

    1978-11-01

    The full title of this study is 'Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirements Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.

  15. Intercultural Action Learning within a Business Context.

    ERIC Educational Resources Information Center

    Sand, Gregory A.

    1996-01-01

    Describes an intercultural program adapted to international marketing requirements by GLOBALTEAM, a marketing consultancy. GLOBALTEAM aims to increase sales by introducing corporate managers and workers to merchandising principles and standards. Training stresses goal setting, appropriate change atmosphere, task-force organization, operational…

  16. Challenges Facing Successful Scaling Up of Effective Screening for Cardiovascular Disease by Community Health Workers in Mexico and South Africa: Policy Implications.

    PubMed

    S, Abrahams-Gessel; Denman, C A; Ta, Gaziano; Ns, Levitt; T, Puoane

    The integration of community health workers (CHWs) into primary and secondary prevention functions in health programs and services delivery in Mexico and South Africa has been demonstrated to be effective. Task-sharing related to adherence and treatment, from nurses to CHWs, has also been effectively demonstrated in these areas. HIV/AIDS and TB programs in South Africa have seen similar successes in task-sharing with CHWs in the areas of screening for risk and adherence to treatment. In the area of non-communicable diseases (NCDs), there is a policy commitment to integrating CHWs into primary health care programs at public health facilities in both Mexico and South Africa in the areas of reproductive health and infant health. Yet current programs utilizing CHWs are not integrated into existing primary health care services in a comprehensive manner for primary and secondary prevention of NCDs. In a recently completed study, CHWs were trained to perform the basic diagnostic function of primary screening to assess the risk of suffering a CVD-related event in the community using a non-laboratory risk assessment tool and referring persons at moderate to high risk to local government clinics, for further assessment and management by a nurse or physician. In this paper we compare the experience with this CVD screening study to successful programs in vaccination, reproductive health, HIV/AIDS, and TB specifically to identify the barriers we identified as limitations to replicating these programs in the area of CVD diagnosis and management. We review barriers impacting the effective translation of policy into practice, including scale up issues; training and certification issues; integrating CHW to existing primary care teams and health system; funding and resource gaps. Finally, we suggest policy recommendations to replicate the demonstrated success of programs utilizing task-sharing with CHWs in infectious diseases and reproductive health, to integrated programs in NCD.

  17. Initiatives and resources to promote antimicrobial stewardship.

    PubMed

    Paño-Pardo, José Ramón; Campos, José; Natera Kindelán, Clara; Ramos, Antonio

    2013-09-01

    The development of an antimicrobial stewardship program (ASP) requires institutional support. However, obtaining sufficient institutional support is often a complex task that requires convincing the hospital's managers of the benefits of these programs. Additionally, in the design and implementation of an ASP, antimicrobial stewardship (AS) leaders need tools for diverse purposes, such as measuring antimicrobial consumption, education and training and designing protocols. In this review we provide useful information for AS promoters to facilitate the task of designing and implementing an ASP. First, we summarize information about various institutions that promote AS and include evidence that supports the need for and benefits of these programs. Then, several campaigns promoting AS are described. Finally, online resources for professionals dealing with AS are briefly summarized. Copyright © 2013 Elsevier España, S.L. All rights reserved.

  18. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management...: CARRIERS SUBJECT TO PART I OF THE INTERSTATE COMMERCE ACT § 357.5 Cash management programs. Oil pipeline... and § 357.2 of this title that participate in cash management programs must file these agreements with...

  19. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Cash management...: CARRIERS SUBJECT TO PART I OF THE INTERSTATE COMMERCE ACT § 357.5 Cash management programs. Oil pipeline... and § 357.2 of this title that participate in cash management programs must file these agreements with...

  20. Effective algorithm for solving complex problems of production control and of material flows control of industrial enterprise

    NASA Astrophysics Data System (ADS)

    Mezentsev, Yu A.; Baranova, N. V.

    2018-05-01

    A universal economical and mathematical model designed for determination of optimal strategies for managing subsystems (components of subsystems) of production and logistics of enterprises is considered. Declared universality allows taking into account on the system level both production components, including limitations on the ways of converting raw materials and components into sold goods, as well as resource and logical restrictions on input and output material flows. The presented model and generated control problems are developed within the framework of the unified approach that allows one to implement logical conditions of any complexity and to define corresponding formal optimization tasks. Conceptual meaning of used criteria and limitations are explained. The belonging of the generated tasks of the mixed programming with the class of NP is shown. An approximate polynomial algorithm for solving the posed optimization tasks for mixed programming of real dimension with high computational complexity is proposed. Results of testing the algorithm on the tasks in a wide range of dimensions are presented.

  1. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-06-04

    Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT...Inside the Navy, October 27, 2008. Another press report (Katherine McIntire Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program...X)s could change.38 A related question is whether the schedule for procuring CG(X)s is properly aligned with foreign-country ballistic missile

  2. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-12-22

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK...press report (Katherine McIntire Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008...changes would have led to a bigger problem—a future surface combatant force that was both unaffordable and poorly aligned with projected mission needs

  3. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2011-04-20

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...construction sequence and application of lessons learned for follow-on vessels in these programs. In the LPD 17 program, the Navy’s reliance on an immature...deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to

  4. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2009-07-17

    Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK...McIntire Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008) quoted Admiral Gary...defined, the total required number of CG(X)s could change.38 A related question is whether the schedule for procuring CG(X)s is properly aligned

  5. 5 CFR 362.402 - Program administration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Program administration. 362.402 Section 362.402 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PATHWAYS PROGRAMS Presidential Management Fellows Program § 362.402 Program administration. (a) The Director may...

  6. 5 CFR 362.402 - Program administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Program administration. 362.402 Section 362.402 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PATHWAYS PROGRAMS Presidential Management Fellows Program § 362.402 Program administration. (a) The Director may...

  7. An Experimental Evaluation of Stress-Management Training for the Airborne Soldier

    DTIC Science & Technology

    1980-06-01

    skill takes considerable time and involves the learning of respiration control techniques and exercises to relax both the skeletal and smooth muscle...NUMBER 7. AUTHORia) 8. CONTRACT OR GRANT NUMBER(.) William P. Burke 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT, PROJECT, TASK US Army...block number) Jumpmaster training Performance under stress Stress-management training Stress reaction Respiration -control Heart rate response Deep

  8. Joint Interagency Task Force-South: The Best Known, Least Understood Interagency Success (INSS Strategic Perspectives, Number 5, June 2011)

    DTIC Science & Technology

    2011-06-01

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ...20319 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR...its subcomponents execute their mission by performing research and analysis, publication, conferences, policy support, and outreach. The mission of

  9. International Intelligence Forum 2002

    DTIC Science & Technology

    2002-01-01

    International Intelligence Forum 2002 PCN 46737 Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection...Intelligence Forum 2002 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...Std Z39-18 INTERNATIONAL INTELLIGENCE FORUM -3 The Joint Military Intelligence College created the International Intelligence Fellows Program

  10. Reusable Rocket Engine Advanced Health Management System. Architecture and Technology Evaluation: Summary

    NASA Technical Reports Server (NTRS)

    Pettit, C. D.; Barkhoudarian, S.; Daumann, A. G., Jr.; Provan, G. M.; ElFattah, Y. M.; Glover, D. E.

    1999-01-01

    In this study, we proposed an Advanced Health Management System (AHMS) functional architecture and conducted a technology assessment for liquid propellant rocket engine lifecycle health management. The purpose of the AHMS is to improve reusable rocket engine safety and to reduce between-flight maintenance. During the study, past and current reusable rocket engine health management-related projects were reviewed, data structures and health management processes of current rocket engine programs were assessed, and in-depth interviews with rocket engine lifecycle and system experts were conducted. A generic AHMS functional architecture, with primary focus on real-time health monitoring, was developed. Fourteen categories of technology tasks and development needs for implementation of the AHMS were identified, based on the functional architecture and our assessment of current rocket engine programs. Five key technology areas were recommended for immediate development, which (1) would provide immediate benefits to current engine programs, and (2) could be implemented with minimal impact on the current Space Shuttle Main Engine (SSME) and Reusable Launch Vehicle (RLV) engine controllers.

  11. Entrepreneurship skills development through project-based activity in Bachelor of Pharmacy program.

    PubMed

    Shahiwala, Aliasgar

    2017-07-01

    To provide pharmacy students with an opportunity to develop entrepreneurial thinking and skills. A business proposal building project-based activity was integrated into a two-credit hour pharmacy management course during the eighth semester of the bachelor of pharmacy degree program. The student groups submitted their proposals, mimicking the process of submitting business proposals and obtaining approval in the real world. Essential management tasks including operation procedures, location and layout design, inventory management, personnel management, marketing management, and finance management were taught step-by-step so that students could work on a similar scenario with their proposal building. Students' career preferences were also measured at the beginning and end of the course. Course was assessed by written exffigam and rubric based project evaluation. Student feedbacks of the project were collected using a five-point Likert scale. The project-based activity was well integrated in the course. The project helped the students (n=72) to understand management concepts more clearly, which was reflected by their significantly higher (p<0.01) grades compared to previous year. Students' feedback was overwhelmingly positive (mean score of 4.53 on the scale of 5). Students developed both interest and confidence to start a pharmacy as a result of this activity. The project was successfully designed and executed in a pharmacy management course within a bachelor of pharmacy curriculum. Based on the response received in this project, efforts will be made to provide guidance and support to the students by calling field experts such as pharmacy owners and financiers. Copyright © 2017 Elsevier Inc. All rights reserved.

  12. SHC Project 3.63, Task 2, Beneficial Use of Waste Materials ...

    EPA Pesticide Factsheets

    SHC Project 3.63, Task 2, “Beneficial Use of Waste Materials”, is designed to conduct research and analyses to characterize and quantify the risks and benefits of using or reusing waste materials. There are 6 primary research areas in Task 2 that cover a broad spectrum of topics germane to the beneficial use of waste materials and address Agency, Office, Region and other client needs. The 6 research areas include: 1) Materials Recovery Technology, 2) Beneficial Use of Materials Optimization, 3) Novel Products from Waste Materials, 4) Land Application of Biosolids, 5) Soil Remediation Amendments and 6) Improved Leaching Methods for More Accurate Prediction of Environmental Release of Metals. The objectives of each research area, their intended products and progress to date will be presented. The products of this Task will enable communities and the Agency to better protect and enhance human health, well-being and the environment for current and future generations, through the reduction in material consumption, reuse, and recycling of materials. This presentation is designed to convey the rational, purpose and planned research in EPAs Safe and Healthy Communities (SHC) National Research Program Project 3.63 (Sustainable Materials Management) Task 2, “Beneficial Use of Waste Materials”, which is designed to conduct research and analyses to characterize and quantify the risks and benefits of using or reusing waste materials. . This presentation has bee

  13. Ground/Air Task Oriented Radar (G/ATOR)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-386 Ground/Air Task Oriented Radar (G/ATOR) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 18, 2016 06:47:59 UNCLASSIFIED G/ATOR December 2015 SAR March 18, 2016 06:47:59 UNCLASSIFIED 2...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost G/ATOR December 2015 SAR March 18

  14. Motor Transport Operator Training: An Approach to Preparing Training Managers and Instructors to Design, Conduct, and Evaluate Performance Oriented Training

    DTIC Science & Technology

    1977-09-01

    the needed knowledge and skills must be provided. Ideally, these programs should be self- contained , capable of easy administration within...type of vehicle, duplicate cards were prepared. In effect, a task file was prepared, the file containing cards which described the task and...test situation contains a description of the situation. (If the operator does not actually encounter the situation, the situation is read to him by

  15. Clinical ladder program implementation: a project guide.

    PubMed

    Ko, Yu Kyung; Yu, Soyoung

    2014-11-01

    This article describes the development of a clinical ladder program (CLP) implementation linked to a promotion system for nurses. The CLP task force developed criteria for each level of performance and a performance evaluation tool reflecting the self-motivation of the applicant for professional development. One year after implementation, the number of nurses taking graduate courses increased, and 7 nurses were promoted to nurse manager positions.

  16. An Analysis of Competencies for Managing Science and Technology Programs

    DTIC Science & Technology

    2008-03-19

    competency modeling through a two-year task force commissioned by the Society for Industrial and Organizational Psychology (Shippmann and others, 2000:704...positions—specifically within Research and Development (R&D) programs. If so, the final investigative question tests whether those differences are...statistics are used to analyze the comparisons through hypothesis testing and t- tests relevant to the research investigative questions. These

  17. Teamwork in Task Analysis. Training Manual V

    DTIC Science & Technology

    1975-11-01

    Research Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370 Approved for public...Corps (Code RD) And Monitored By Personnel and Training Research Programs Psychological Sciences Division Office of Naval Research Contract No...survival in the hidden warfare of the destructive psychological win-lose game. Win-lose behavior stems from individual attitudes and manage- ment climate

  18. TARDEC Update for TTCP

    DTIC Science & Technology

    2009-04-01

    09 COL Kevin Peterson Principal Deputy Program Manager Joint MRAP Vehicle Program 17 MRAP Variant Overview FP COUGAR CAT I (FPII CAT I) MaxxPro BAE...distribution unlimited 13. SUPPLEMENTARY NOTES Presented at the TTCP LND TP3 Annual Meeting and Task Workshop Manned and Unmanned Ground Vehicle Systems, 23...28 April 2009, Suffield, Alberta, Canada, The original document contains color images. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY

  19. Helping Older People To Live Independently. Annual Report to the Governor and the Illinois General Assembly on Public Act 81-202, Fiscal Year 1987.

    ERIC Educational Resources Information Center

    Illinois State Dept. on Aging, Springfield.

    This document describes Illinois' Community Care Program (CCP), a program which provides chore housekeeping, homemaker, and adult day care services to older persons who cannot perform some tasks basic of everyday life without assistance, in order to help them live independently. Case management, information and referral, and nursing home…

  20. MBTA Green Line Tests - Riverside Line, December 1972 : Volume 5. Gage Computer Printout.

    DOT National Transportation Integrated Search

    1973-01-01

    The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...

  1. Thermally Optimized Paradigm of Thermal Management (TOP-M)

    DTIC Science & Technology

    2017-07-18

    ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8...19b. TELEPHONE NUMBER (Include area code) 18-07-2017 Final Technical Jul 2015 - Jul 2017 NICOP - Thermally Optimized Paradigm of Thermal Management ...The main goal of this research was to present a New Thermal Management Approach, which combines thermally aware Very/Ultra Large Scale Integration

  2. The Role of Affect in Intraindividual Variability in Task Performance for Young Learners

    ERIC Educational Resources Information Center

    Butler, Yuko Goto

    2017-01-01

    Young learners (defined as children ages 5-12) of English as a foreign language are growing in number worldwide. At the policy level, foreign language (FL) programs for young learners are increasingly emphasizing the use of task-based language teaching (TBLT). In practice, however, designing and implementing tasks for young learners poses numerous…

  3. Flight performance measurement utilizing a figure of merit (FOM)

    NASA Technical Reports Server (NTRS)

    Mosier, Kathleen L.; Zacharias, Greg L.

    1993-01-01

    One of the goals of the NASA Strategic Behavior/Workload Management Program is to develop standardized procedures for constructing figures of merit (FOMs) that describe minimal criteria for flight task performance, as well as summarize overall performance quality. Such a measure could be utilized for evaluating flight crew performance, for assessing the effectiveness of new equipment or technological innovations, or for measuring performance at a particular airport. In this report, we describe the initial phases in the creation of a FOM to be employed in examining crew performance in NASA-Ames Air Ground Compatibility and Strategic Behavior/Workload Management programs.

  4. X-Windows Information Sharing Protocol Widget Class

    NASA Technical Reports Server (NTRS)

    Barry, Matthew R.

    2006-01-01

    The X-Windows Information Sharing Protocol (ISP) Widget Class ("Class") is used here in the object-oriented-programming sense of the word) was devised to simplify the task of implementing ISP graphical-user-interface (GUI) computer programs. ISP programming tasks require many method calls to identify, query, and interpret the connections and messages exchanged between a client and an ISP server. Most X-Windows GUI programs use widget sets or toolkits to facilitate management of complex objects. The widget standards facilitate construction of toolkits and application programs. The X-Windows Information Sharing Protocol (ISP) Widget Class encapsulates the client side of the ISP programming libraries within the framework of an X-Windows widget. Using the widget framework, X-Windows GUI programs can interact with ISP services in an abstract way and in the same manner as that of other graphical widgets, making it easier to write ISP GUI client programs. Wrapping ISP client services inside a widget framework enables a programmer to treat an ISP server interface as though it were a GUI. Moreover, an alternate subclass could implement another communication protocol in the same sort of widget.

  5. Process-oriented Approach to Designing Immersion Assessments

    DTIC Science & Technology

    2014-02-01

    Command (USSOCOM) Command Language Program Manager (CLPM) Advanced Competencies Course in a presentation titled, The Language Needs Assessment Process and...Techniques can be very similar • Physical v. psychological fidelity • Johns (2006) Discrete Context—task, social and physical • 4Ps : Purpose

  6. High-Performance Manufacturing Technology Research and Development Pilot Program for Fiscal Year 2006

    DTIC Science & Technology

    2008-05-01

    Pilot Program for Fiscal Year 2006 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6 . AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...production risk and maximize life-cycle performance and affordability. This report is in response to Public Law 109-163 (January 6 , 2006), Subtitle D, High...NSF), and the Department of Homeland Security (DHS). 1.3 PURPOSE OF REPORT This report is provided in response to Public Law 109-163 (January 6

  7. Natural-Language Parser for PBEM

    NASA Technical Reports Server (NTRS)

    James, Mark

    2010-01-01

    A computer program called "Hunter" accepts, as input, a colloquial-English description of a set of policy-based-management rules, and parses that description into a form useable by policy-based enterprise management (PBEM) software. PBEM is a rules-based approach suitable for automating some management tasks. PBEM simplifies the management of a given enterprise through establishment of policies addressing situations that are likely to occur. Hunter was developed to have a unique capability to extract the intended meaning instead of focusing on parsing the exact ways in which individual words are used.

  8. Using principles from emergency management to improve emergency response plans for research animals.

    PubMed

    Vogelweid, Catherine M

    2013-10-01

    Animal research regulatory agencies have issued updated requirements for emergency response planning by regulated research institutions. A thorough emergency response plan is an essential component of an institution's animal care and use program, but developing an effective plan can be a daunting task. The author provides basic information drawn from the field of emergency management about best practices for developing emergency response plans. Planners should use the basic principles of emergency management to develop a common-sense approach to managing emergencies in their facilities.

  9. Navy CG(X) Cruiser Program: Background for Congress

    DTIC Science & Technology

    2010-09-28

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS...Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008) quoted Admiral Gary Roughead...number of CG(X)s could have changed.38 A related question was whether the schedule for procuring CG(X)s was properly aligned with foreign-country

  10. Navy CG(X) Cruiser Program: Background for Congress

    DTIC Science & Technology

    2010-02-26

    5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS...Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008) quoted Admiral Gary Roughead...CG(X)s could change.40 A related question was whether the schedule for procuring CG(X)s was properly aligned with foreign-country ballistic missile

  11. DARPA/USAF/USN J-UCAS X-45A System Demonstration Program: A Review of Flight Test Site Processes and Personnel

    NASA Technical Reports Server (NTRS)

    Cosentino, Gary B.

    2008-01-01

    The Joint Unmanned Combat Air Systems (J-UCAS) program is a collaborative effort between the Defense Advanced Research Project Agency (DARPA), the US Air Force (USAF) and the US Navy (USN). Together they have reviewed X-45A flight test site processes and personnel as part of a system demonstration program for the UCAV-ATD Flight Test Program. The goal was to provide a disciplined controlled process for system integration and testing and demonstration flight tests. NASA's Dryden Flight Research Center (DFRC) acted as the project manager during this effort and was tasked with the responsibilities of range and ground safety, the provision of flight test support and infrastructure and the monitoring of technical and engineering tasks. DFRC also contributed their engineering knowledge through their contributions in the areas of autonomous ground taxi control development, structural dynamics testing and analysis and the provision of other flight test support including telemetry data, tracking radars, and communications and control support equipment. The Air Force Flight Test Center acted at the Deputy Project Manager in this effort and was responsible for the provision of system safety support and airfield management and air traffic control services, among other supporting roles. The T-33 served as a J-UCAS surrogate aircraft and demonstrated flight characteristics similar to that of the the X-45A. The surrogate served as a significant risk reduction resource providing mission planning verification, range safety mission assessment and team training, among other contributions.

  12. Shuttle era waste management and biowaste monitoring

    NASA Technical Reports Server (NTRS)

    Sauer, R. L.; Fogal, G. L.

    1976-01-01

    The acquisition of crew biomedical data has been an important task on manned space missions. The monitoring of biowastes from the crew to support water and mineral balance studies and endocrine studies has been a valuable part of this activity. This paper will present a review of waste management systems used in past programs. This past experience will be cited as to its influence on the Shuttle design. Finally, the Shuttle baseline waste management system and the proposed Shuttle biomedical measurement and sampling systems will be presented.

  13. Scientific Workflow Management in Proteomics

    PubMed Central

    de Bruin, Jeroen S.; Deelder, André M.; Palmblad, Magnus

    2012-01-01

    Data processing in proteomics can be a challenging endeavor, requiring extensive knowledge of many different software packages, all with different algorithms, data format requirements, and user interfaces. In this article we describe the integration of a number of existing programs and tools in Taverna Workbench, a scientific workflow manager currently being developed in the bioinformatics community. We demonstrate how a workflow manager provides a single, visually clear and intuitive interface to complex data analysis tasks in proteomics, from raw mass spectrometry data to protein identifications and beyond. PMID:22411703

  14. PC tools for project management: Programs and the state-of-the-practice

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Freedman, Glenn B.; Dede, Christopher J.; Lidwell, William; Learned, David

    1990-01-01

    The use of microcomputer tools for NASA project management; which features are the most useful; the impact of these tools on job performance and individual style; and the prospects for new features in project management tools and related tools are addressed. High, mid, and low end PM tools are examined. The pro's and con's of the tools are assessed relative to various tasks. The strengths and weaknesses of the tools are presented through cases and demonstrations.

  15. Information Technology Portfolio Management Proof of Concept: Modern Portfolio Theory With KVA and ROI Analysis

    DTIC Science & Technology

    2010-09-01

    approach” that provides analysis for “program managers to attain the right knowledge [e.g., portfolio values] at critical junctures so they can make...portfolio, it is critical to create a credible beta (β) for the presumed “market volatility” of the IT asset class. The KVA methodology may be used...for this critical task. Establishing a beta (β) for DoD wide IT portfolio management uses the work conducted at the Naval Postgraduate School (NPS

  16. Guidelines for the Development and Implementation of a Logistic Resource Annex to the Five Year Defense Program. Volume 4. A Logistic Resource Annex for the Marine Corps Section of the DNFYP

    DTIC Science & Technology

    1978-10-01

    Information ; Logistics Planning; Management Planning and Control; Management Information Systems; Management; Military Supplies; Acquisition; JO...Arlington, Virginia 22202 Contract DAHC 15-73C-0200 Task 78-II-1 CONTENTS GLOSSARY : v SUMMARY ix I. INTRODUCTION 1 II. MARINE CORPS SUPPORT OP...Materiel Command Navy Cost Information System/FYDP Subsystem Non-Industrial Fund Non-Telecommunications Offfice of the Assistant Secretary of Defense

  17. Engineering development of selective agglomeration: Task 5, Bench- scale process testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Under the overall objectives of DOE Contract ``Engineering Development of Selective Agglomeration,`` there were a number of specific objectives in the Task 5 program. The prime objectives of Task 5 are highlighted below: (1) Maximize process performance in pyritic sulfur rejection and BTU recovery, (2) Produce a low ash product, (3) Compare the performance of the heavy agglomerant process based on diesel and the light agglomerant process using heptane, (4) Define optimum processing conditions for engineering design, (5) Provide first-level evaluation of product handleability, and (6) Explore and investigate process options/ideas which may enhance process performance and/or product handleability.

  18. Engineering development of selective agglomeration: Task 5, Bench- scale process testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Under the overall objectives of DOE Contract Engineering Development of Selective Agglomeration,'' there were a number of specific objectives in the Task 5 program. The prime objectives of Task 5 are highlighted below: (1) Maximize process performance in pyritic sulfur rejection and BTU recovery, (2) Produce a low ash product, (3) Compare the performance of the heavy agglomerant process based on diesel and the light agglomerant process using heptane, (4) Define optimum processing conditions for engineering design, (5) Provide first-level evaluation of product handleability, and (6) Explore and investigate process options/ideas which may enhance process performance and/or product handleability.

  19. Data management of a multilaboratory field program using distributed processing. [PRECP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tichler, J.L.

    The PRECP program is a multilaboratory research effort conducted by the US Department of Energy as a part of the National Acid Precipitation Assessment Program (NAPAP). The primary objective of PRECP is to provide essential information for the quantitative description of chemical wet deposition as a function of air pollution loadings, geograpic location, and atmospheric processing. The program is broken into four closely interrelated sectors: Diagnostic Modeling; Field Measurements; Laboratory Measurements; and Climatological Evaluation. Data management tasks are: compile databases of the data collected in field studies; verify the contents of data sets; make data available to program participants eithermore » on-line or by means of computer tapes; perform requested analyses, graphical displays, and data aggregations; provide an index of what data is available; and provide documentation for field programs both as part of the computer database and as data reports.« less

  20. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson P. Khosah; Frank T. Alex

    2007-02-11

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-eighth month of development activities.« less

  1. DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM 2.5) RESEARCH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson P. Khosah; Charles G. Crawford

    2006-02-11

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-second month of development activities.« less

  2. Patient attitudes about financial incentives for diabetes self-management: A survey.

    PubMed

    Blondon, Katherine S

    2015-06-10

    To study the acceptability of incentives for behavior changes in individuals with diabetes, comparing financial incentives to self-rewards and non-financial incentives. A national online survey of United States adults with diabetes was conducted in March 2013 (n = 153). This survey was designed for this study, with iterative testing and modifications in a pilot population. We measured the demographics of individuals, their interest in incentives, as well as the perceived challenge of diabetes self-management tasks, and expectations of incentives to improve diabetes self-management (financial, non-financial and self-rewards). Using an ordered logistic regression model, we assessed the association between a 32-point score of the perceived challenge of the self-management tasks and the three types of rewards. Ninety-six percent of individuals were interested in financial incentives, 60% in non-financial incentives and 72% in self-rewards. Patients were less likely to use financial incentives when they perceived the behavior to be more challenging (odds ratio of using financial incentives of 0.82 (95%CI: 0.72-0.93) for each point of the behavior score). While the effectiveness of incentives may vary according to the perceived level of challenge of each behavior, participants did not expect to need large amounts to motivate them to modify their behavior. The expected average amounts needed to motivate a 5 lb weight loss in our population and to maintain this weight change for a year was $258 (interquartile range of $10-100) and $713 (interquartile range of $25-250) for a 15 lb weight loss. The difference in mean amount estimates for 5 lb and 15 lb weight loss was significant (P < 0.001). Individuals with diabetes are willing to consider financial incentives to improve diabetes self-management. Future studies are needed to explore incentive programs and their effectiveness for diabetes.

  3. Patient attitudes about financial incentives for diabetes self-management: A survey

    PubMed Central

    Blondon, Katherine S

    2015-01-01

    AIM: To study the acceptability of incentives for behavior changes in individuals with diabetes, comparing financial incentives to self-rewards and non-financial incentives. METHODS: A national online survey of United States adults with diabetes was conducted in March 2013 (n = 153). This survey was designed for this study, with iterative testing and modifications in a pilot population. We measured the demographics of individuals, their interest in incentives, as well as the perceived challenge of diabetes self-management tasks, and expectations of incentives to improve diabetes self-management (financial, non-financial and self-rewards). Using an ordered logistic regression model, we assessed the association between a 32-point score of the perceived challenge of the self-management tasks and the three types of rewards. RESULTS: Ninety-six percent of individuals were interested in financial incentives, 60% in non-financial incentives and 72% in self-rewards. Patients were less likely to use financial incentives when they perceived the behavior to be more challenging (odds ratio of using financial incentives of 0.82 (95%CI: 0.72-0.93) for each point of the behavior score). While the effectiveness of incentives may vary according to the perceived level of challenge of each behavior, participants did not expect to need large amounts to motivate them to modify their behavior. The expected average amounts needed to motivate a 5 lb weight loss in our population and to maintain this weight change for a year was $258 (interquartile range of $10-100) and $713 (interquartile range of $25-250) for a 15 lb weight loss. The difference in mean amount estimates for 5 lb and 15 lb weight loss was significant (P < 0.001). CONCLUSION: Individuals with diabetes are willing to consider financial incentives to improve diabetes self-management. Future studies are needed to explore incentive programs and their effectiveness for diabetes. PMID:26069724

  4. DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM2.5) RESEARCH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson P. Khosah; Charles G. Crawford

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase 1, which is currently in progress and will take twelve months to complete, will include the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. In Phase 2, which will be completed in the second year of the project, a platform for on-line data analysis will be developed. Phase 2 will include the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its eleventh month of Phase 1 development activities.« less

  5. 40 CFR 52.2059 - Control strategy: Particulate matter.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Control strategy: Particulate matter... Control strategy: Particulate matter. (a) Pennsylvania has committed to undertake a comprehensive program... Investigating and Controlling Nontraditional Particulate Matter Emissions Task Completion date Scheduled tasks...

  6. 40 CFR 52.2059 - Control strategy: Particulate matter.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Control strategy: Particulate matter... Control strategy: Particulate matter. (a) Pennsylvania has committed to undertake a comprehensive program... Investigating and Controlling Nontraditional Particulate Matter Emissions Task Completion date Scheduled tasks...

  7. A Review of Persuasive Principles in Mobile Apps for Chronic Arthritis Patients: Opportunities for Improvement.

    PubMed

    Geuens, Jonas; Swinnen, Thijs Willem; Westhovens, Rene; de Vlam, Kurt; Geurts, Luc; Vanden Abeele, Vero

    2016-10-13

    Chronic arthritis (CA), an umbrella term for inflammatory rheumatic and other musculoskeletal diseases, is highly prevalent. Effective disease-modifying antirheumatic drugs for CA are available, with the exception of osteoarthritis, but require a long-term commitment of patients to comply with the medication regimen and management program as well as a tight follow-up by the treating physician and health professionals. Additionally, patients are advised to participate in physical exercise programs. Adherence to exercises and physical activity programs is often very low. Patients would benefit from support to increase medication compliance as well as compliance to the physical exercise programs. To address these shortcomings, health apps for CA patients have been created. These mobile apps assist patients in self-management of overall health measures, health prevention, and disease management. By including persuasive principles designed to reinforce, change, or shape attitudes or behaviors, health apps can transform into support tools that motivate and stimulate users to achieve or keep up with target behavior, also called persuasive systems. However, the extent to which health apps for CA patients consciously and successfully employ such persuasive principles remains unknown. The objective of this study was to evaluate the number and type of persuasive principles present in current health apps for CA patients. A review of apps for arthritis patients was conducted across the three major app stores (Google Play, Apple App Store, and Windows Phone Store). Collected apps were coded according to 37 persuasive principles, based on an altered version of the Persuasive System Design taxonomy of Oinas-Kukkonen and Harjuma and the taxonomy of Behavior Change Techniques of Michie and Abraham. In addition, user ratings, number of installs, and price of the apps were also coded. We coded 28 apps. On average, 5.8 out of 37 persuasive principles were used in each app. The most used category of persuasive principles was System Credibility with an average of 2.6 principles. Task Support was the second most used, with an average of 2.3 persuasive principles. Next was Dialogue Support with an average of 0.5 principles. Social Support was last with an average of 0.01 persuasive principles only. Current health apps for CA patients would benefit from adding Social Support techniques (eg, social media, user fora) and extending Dialogue Support techniques (eg, rewards, praise). The addition of automated tracking of health-related parameters (eg, physical activity, step count) could further reduce the effort for CA patients to manage their disease and thus increase Task Support. Finally, apps for health could benefit from a more evidence-based approach, both in developing the app as well as ensuring that content can be verified as scientifically proven, which will result in enhanced System Credibility.

  8. Test Plans. Lightweight Durable TPS: Tasks 1,2,4,5, and 6

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.; Tu, Tina

    1994-01-01

    The objective of this task is to develop the fluted core flexible blankets, also referred to as the Tailorable Advanced Blanket Insulation (TABI), to a technology readiness level (TRL) of 6. This task is one of the six tasks under TA 3, Lightweight Durable TPS study, of the Single Stage to Orbit (SSTO) program. The purpose of this task is to develop a durable and low maintenance flexible TPS blanket material to be implemented on the SSTO vehicle.

  9. Tasks completed by nursing members of a teaching hospital Medical Emergency Team.

    PubMed

    Topple, Michelle; Ryan, Brooke; Baldwin, Ian; McKay, Richard; Blythe, Damien; Rogan, John; Radford, Sam; Jones, Daryl

    2016-02-01

    To assess tasks completed by intensive care medical emergency team nurses. Prospective observational study. Australian teaching hospital. Nursing-related technical and non-technical tasks and level of self-reported confidence and competence. Amongst 400 calls, triggers and nursing tasks were captured in 93.5% and 77.3% of cases, respectively. The median patient age was 73 years. The four most common triggers were hypotension (22.0%), tachycardia (21.1%), low SpO2 (17.4%), and altered conscious state (10.1%). Non-technical skills included investigation review (33.7%), history acquisition (18.4%), contribution to the management plan (40.5%) and explanation to bedside nurses (78.3%), doctors (13.6%), allied health (3.9%) or patient/relative (39.5%). Technical tasks included examining the circulation (32%), conscious state (29.4%), and chest (26.5%). Additional tasks included adjusting oxygen (23.9%), humidification (8.4%), non-invasive ventilation (6.5%), performing an ECG (22%), and administrating fluid as a bolus (17.5%) or maintenance (16, 5.2%), or medication as a statim dose (16.8%) or infusion (5.2%). Self-reported competence and confidence appeared to be high overall amongst our MET nurses. Our findings provide important information on the tasks completed by Medical Emergency Team nurses and will guide future training. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. Characteristics and Pay of Federal Civilian Employees

    DTIC Science & Technology

    2007-03-01

    of Federal Civilian Employees 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...dental assistants , safety technicians, photographers, cartographic tech- nicians, and food inspectors. In December 2005, about 370,000 employees ...promotion program . CHARACTERISTICS AND PAY OF FEDERAL CIVILIAN EMPLOYEES 11pay. Sixty percent of them also switch to a different occu- pation when they

  11. Remote Excavation of Heavily Contaminated UXO Sites. The Range Master

    DTIC Science & Technology

    2007-09-05

    NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND...Master) ESTCP Project UX-200327 ii Final Phase II Report, September 2007 3.5.5 Sampling Plan...Explosive HSP Health and Safety Program HTRW Hazardous, Toxic, and Radioactive Waste HTW Hazardous and Toxic Waste HW Hazardous Waste IAW In

  12. Suicide Prevention: Suicide Prevention for Department of the Army Civilians

    DTIC Science & Technology

    2009-12-01

    TG 325D December 2009 SUICIDE PREVENTION SUICIDE PREVENTION FOR DEPARTMENT OF THE ARMY CIVILIANS PREPARED BY THE U. S. ARMY... Suicide Prevention 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT... SUICIDE PREVENTION PROGRAM 2 INSTRUCTIONAL PROCEDURES 3 INSTRUCTOR NOTE 3 SUICIDE AWARENESS TRAINING FOR CIVILIAN EMPLOYEES

  13. Coast Guard Deepwater Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2007-10-10

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...112 Appendix E. NGSS Testimony...Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ) contract for the Deepwater

  14. Local Gov`t assistance in commercial waste reduction & recycling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hannah, C.W.

    This paper outlines programs and strategies for reducing the waste stream by targeting the commercial, industrial and institutional sectors. The programs described are implemented by the Wake County Solid Waste Management Division, North Carolina. Findings and recommendations of a task force focusing on the role of the private sector in meeting state waste reduction mandates are summarized. Commercial initiatives, educational initiatives, and a grant program are described. Several case studies are provided which overview the variety of businesses and waste materials addressed.

  15. Scoping of flood hazard mapping needs for Kennebec County, Maine

    USGS Publications Warehouse

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Kennebec County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Kennebec County. Scoping activities included assembling existing data and map needs information for communities in Kennebec County (efforts were made to not duplicate those of pre-scoping completed in March 2005), documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Kennebec County, Maine is 16 years. Most of these studies were in the late 1970's to the mid 1980s. However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Kennebec County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Kennebec County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how e

  16. Scoping of flood hazard mapping needs for Somerset County, Maine

    USGS Publications Warehouse

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Somerset County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Somerset County. Scoping activities included assembling existing data and map needs information for communities in Somerset County (efforts were made to not duplicate those of pre-scoping completed in March 2005), documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Somerset County, Maine is 18.1 years. Most of these studies were in the late 1970's to the mid 1980s. However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Somerset County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Somerset County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and ho

  17. Scoping of flood hazard mapping needs for Cumberland County, Maine

    USGS Publications Warehouse

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    This report was prepared by the U.S. Geological Survey (USGS) Maine Water Science Center as the deliverable for scoping of flood hazard mapping needs for Cumberland County, Maine, under Federal Emergency Management Agency (FEMA) Inter-Agency Agreement Number HSFE01-05-X-0018. This section of the report explains the objective of the task and the purpose of the report. The Federal Emergency Management Agency (FEMA) developed a plan in 1997 to modernize the FEMA flood mapping program. FEMA flood maps delineate flood hazard areas in support of the National Flood Insurance Program (NFIP). FEMA's plan outlined the steps necessary to update FEMA's flood maps for the nation to a seamless digital format and streamline FEMA's operations in raising public awareness of the importance of the maps and responding to requests to revise them. The modernization of flood maps involves conversion of existing information to digital format and integration of improved flood hazard data as needed. To determine flood mapping modernization needs, FEMA has established specific scoping activities to be done on a county-by-county basis for identifying and prioritizing requisite flood-mapping activities for map modernization. The U.S. Geological Survey (USGS), in cooperation with FEMA and the Maine State Planning Office Floodplain Management Program, began scoping work in 2005 for Cumberland County. Scoping activities included assembling existing data and map needs information for communities in Cumberland County, documentation of data, contacts, community meetings, and prioritized mapping needs in a final scoping report (this document), and updating the Mapping Needs Update Support System (MNUSS) Database or its successor with information gathered during the scoping process. The average age of the FEMA floodplain maps in Cumberland County, Maine is 21 years. Most of these studies were in the early to mid 1980s. However, in the ensuing 20-25 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Cumberland County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Cumberland County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how effective FIS data can be used in new project, and identify other data needed to

  18. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office of Personnel Management may review the human resources management programs and practices of any agency and...

  19. Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.; Bannochie, C. J.

    2017-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

  20. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  1. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  2. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  3. 6 CFR 29.5 - Requirements for protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROTECTED CRITICAL... PCII Program Manager or the PCII Program Manager's designee; (2) The information is submitted for... information initially provided received by the PCII Program Manager or the PCII Program Manager's designee...

  4. 6 CFR 29.5 - Requirements for protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROTECTED CRITICAL... PCII Program Manager or the PCII Program Manager's designee; (2) The information is submitted for... information initially provided received by the PCII Program Manager or the PCII Program Manager's designee...

  5. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  6. Impact of a disability management program on employee productivity in a petrochemical company.

    PubMed

    Skisak, Christopher M; Bhojani, Faiyaz; Tsai, Shan P

    2006-05-01

    An inhouse disability management program was implemented to reduce nonoccupational absences in a petrochemical corporation. The program was administered by full-time certified, corporate-based case managers and nine manufacturing location nurses. Employees were required to report all absences on the first day and again on the fourth workday of absence. A medical certification form was required for absences of 4 or more working days. Extended absences were actively managed. An Internet-based case management tool, Medgate, was used as a primary management tool. Results were compared with the previous year among the target population and with company business units not participating in the program. The program resulted in a 10% reduction in total absence days per employee (6.9 to 6.2) compared with the previous year, whereas business units not using the program had an 8% increase (5.5 to 5.9). This disability management program resulted in a more than four to one return on investment based on direct expenditures and cost savings in terms of reduced absence days. The inhouse disability management program was successful by absence duration, employee satisfaction, and return on investment criteria.

  7. Lower Klickitat Riparian and In-channel Habitat Restoration Project; Klickitat Watershed Enhancement, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conley, Will

    2004-01-01

    The overall goal of the Klickitat Watershed Enhancement Project (KWEP) is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of stream reaches and watersheds supporting native anadromous fish production, particularly steelhead (Oncorhyncus mykiss; ESA- listed as 'Threatened' within the Mid-Columbia ESU) and spring Chinook (O. tshawytscha). Habitat restoration activities in the Klickitat subbasin augment goals and objectives of the Yakima Klickitat Fisheries Project (YKFP), NPPC Fish and Wildlife Program, Klickitat Subbasin Summary and the NMFS Biological Opinion (All-H paper). Work is conducted to enhance instream andmore » contributing upland habitat to facilitate increased natural production potential for native salmonid stocks. Efforts in the Klickitat Subbasin fall into two main categories: (1) identification and prioritization of sites for protection and restoration activities, (2) implementation of protection and restoration measures. KWEP personnel also assist monitoring efforts of the YKFP Monitoring & Evaluation Project. During the September 2002-August 2003 reporting period, KWEP personnel continued efforts to address feedback from the August 2000 Provincial Review that indicated a need for better information management and development of geographic priorities by: (1) Assisting development of the Strategic Habitat Plan for the Klickitat Lead Entity (Task A3.1) and Klickitat steelhead EDT model (Task A4.1); (2) Improving the functionality of reference point, habitat unit, and large woody debris modules of the habitat database as well as addition of a temperature module (Tasks A1.1-1.2); (3) Continuing development and acquisition of GIS data (Task A1.3); (4) Ongoing data collection efforts to fill information gaps including streamflow, habitat, and temperature (Objectives C1 and C2); and (5) Completion of planning, field work, and hydrologic modeling associated with roads assessment in the White Creek watershed (Task A4.2). Significant milestones associated with restoration projects during the reporting period included: (1) Completion of the Surveyors Fish Creek Passage Enhancement project (Task B2.3); (2) Completion of interagency agreements for the Klickitat Meadows (Task B2.4) and Klickitat Mill (Task B2.10) projects; (3) Completion of topographic surveys for the Klickitat Meadows (Task B2.4), Klickitat River Meadows (Task B2.5), Trout Creek and Bear Creek culvert replacements (Task B2.7), and Snyder Swale II (Task B2.13) projects; (4) Completion of the Snyder Swale II - Phase 1 project (Task B2.13); (5) Completion of design, planning, and permitting for the Klickitat Mill project (Task B2.10) and initiation of construction; (6) Design for the Trout and Bear Creek culverts (B2.7) were brought to the 60% level; and (7) Completion of design work for the for the Klickitat Meadows (Task B2.4) and Klickitat River Meadows (Task B2.5) projects.« less

  8. Surgical Practical Skills Learning Curriculum: Implementation and Interns' Confidence Perceptions.

    PubMed

    Acosta, Danilo; Castillo-Angeles, Manuel; Garces-Descovich, Alejandro; Watkins, Ammara A; Gupta, Alok; Critchlow, Jonathan F; Kent, Tara S

    To provide an overview of the practical skills learning curriculum and assess its effects over time on the surgical interns' perceptions of their technical skills, patient management, administrative tasks, and knowledge. An 84-hour practical skills curriculum composed of didactic, simulation, and practical sessions was implemented during the 2015 to 2016 academic year for general surgery interns. Totally, 40% of the sessions were held during orientation, whereas the remainder sessions were held throughout the academic year. Interns' perceptions of their technical skills, administrative tasks, patient management, and knowledge were assessed by the practical skills curriculum residents' perception survey at various time points during their intern year (baseline, midpoint, and final). Interns were also asked to fill out an evaluation survey at the completion of each session to obtain feedback on the curriculum. General Surgery Residency program at a tertiary care academic institution. 20 General Surgery categorical and preliminary interns. Significant differences were found over time in interns' perceptions on their technical skills, patient management, administrative tasks, and knowledge (p < 0.001 for all). The results were also statistically significant when accounting for a prior boot camp course in medical school, intern status (categorical or preliminary), and gender (p < 0.05 for all). Differences in interns' perceptions occurred both from baseline to midpoint, and from midpoint to final time point evaluations (p < 0.001 for all). Prior surgical boot camp in medical school status, intern status (categorical vs. preliminary), and gender did not differ in the interns' baseline perceptions of their technical skills, patient management, administrative tasks, and knowledge (p > 0.05 for all). Implementation of a Practical Skills Curriculum in surgical internships can improve interns' confidence perception on their technical skills, patient management skills, administrative tasks, and knowledge. Copyright © 2018. Published by Elsevier Inc.

  9. A Comparative Study of Management System between the U.S. and Korea.

    DTIC Science & Technology

    1984-09-01

    PROGRAM ELEMENT. PROJECT, TASK AREA & WORK UNIT NUMBERS Naval Postgraduate School Monterey, CA 93943 I. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT... Controlling Office) 15. SECURITY CLASS. (of this report) Unclassified 0 1Sa. DECLASSIFICATION’ DOWNGRADING SCHEDULE 16. OISTRIBUTION STATEMENT (of this Report...Now, however, research on leadership, management and organization provides a more stable hcdy of knowledge. Manajement practice can be hasel on

  10. Professional Development and TransLink[R]. Final Report.

    ERIC Educational Resources Information Center

    Kuhn, Beverly T.; Jasek, Deborah

    This report covers one segment of a larger professional development program for transportation professionals that addresses the need to develop a larger cadre of transportation professionals capable of designing, planning, managing, operating, and maintaining the transportation infrastructure nationwide. Three specific tasks were undertaken and…

  11. Operate a Nuclear Power Plant.

    ERIC Educational Resources Information Center

    Frimpter, Bonnie J.; And Others

    1983-01-01

    Describes classroom use of a computer program originally published in Creative Computing magazine. "The Nuclear Power Plant" (runs on Apple II with 48K memory) simulates the operating of a nuclear generating station, requiring students to make decisions as they assume the task of managing the plant. (JN)

  12. Preferences and needs of patients with a rheumatic disease regarding the structure and content of online self-management support.

    PubMed

    Ammerlaan, Judy W; van Os-Medendorp, Harmieke; de Boer-Nijhof, Nienke; Maat, Bertha; Scholtus, Lieske; Kruize, Aike A; Bijlsma, Johannes W J; Geenen, Rinie

    2017-03-01

    Aim of this study was to investigate preferences and needs regarding the structure and content of a person-centered online self-management support intervention for patients with a rheumatic disease. A four step procedure, consisting of online focus group interviews, consensus meetings with patient representatives, card sorting task and hierarchical cluster analysis was used to identify the preferences and needs. Preferences concerning the structure involved 1) suitability to individual needs and questions, 2) fit to the life stage 3) creating the opportunity to share experiences, be in contact with others, 4) have an expert patient as trainer, 5) allow for doing the training at one's own pace and 6) offer a brief intervention. Hierarchical cluster analysis of 55 content needs comprised eleven clusters: 1) treatment knowledge, 2) societal procedures, 3) physical activity, 4) psychological distress, 5) self-efficacy, 6) provider, 7) fluctuations, 8) dealing with rheumatic disease, 9) communication, 10) intimate relationship, and 11) having children. A comprehensive assessment of preferences and needs in patients with a rheumatic disease is expected to contribute to motivation, adherence to and outcome of self-management-support programs. The overview of preferences and needs can be used to build an online-line self-management intervention. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  13. The Statistical Package for the Social Sciences (SPSS) as an adjunct to pharmacokinetic analysis.

    PubMed

    Mather, L E; Austin, K L

    1983-01-01

    Computer techniques for numerical analysis are well known to pharmacokineticists. Powerful techniques for data file management have been developed by social scientists but have, in general, been ignored by pharmacokineticists because of their apparent lack of ability to interface with pharmacokinetic programs. Extensive use has been made of the Statistical Package for the Social Sciences (SPSS) for its data handling capabilities, but at the same time, techniques have been developed within SPSS to interface with pharmacokinetic programs of the users' choice and to carry out a variety of user-defined pharmacokinetic tasks within SPSS commands, apart from the expected variety of statistical tasks. Because it is based on a ubiquitous package, this methodology has all of the benefits of excellent documentation, interchangeability between different types and sizes of machines and true portability of techniques and data files. An example is given of the total management of a pharmacokinetic study previously reported in the literature by the authors.

  14. Navy CG(X) Cruiser Program: Background for Congress

    DTIC Science & Technology

    2010-04-08

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...Inside the Navy, October 27, 2008. Another press report (Katherine McIntire Peters, “Navy’s Top Officer Sees Lessons in Shipbuilding Program Failures...have changed.37 A related question was whether the schedule for procuring CG(X)s was properly aligned with foreign-country ballistic missile

  15. Navy CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2008-11-18

    ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES... Lessons in Shipbuilding Program Failures,” GovernmentExecutive.com, September 24, 2008) quoted Admiral Gary Roughead, the Chief of Naval Operations, as...the schedule for procuring CG(X)s is properly aligned with foreign-country ballistic missile development programs. A 2005 defense trade press report

  16. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office of...

  17. Staffing and organisation of nursing care in cardiac intensive care units in Greece.

    PubMed

    Merkouris, Anastasios; Papathanassoglou, Elizabeth D E; Pistolas, Dimitrios; Papagiannaki, Vasileia; Floros, John; Lemonidou, Chryssoula

    2003-07-01

    To explore staffing and organisational characteristics of nursing care in cardiac intensive care units (CICUs) in Greece. An exploratory descriptive survey design with additional cross-sectional comparisons was employed. A specifically developed survey-type questionnaire, addressed to nurse managers, was distributed to all CICUs in Greece. The response rate was 76.2% (N=32 units). Nursing staff per bed ratios over 24 h (whole-time equivalent) were very low and exhibited a mean of 1.25 (+/-0.53). The total registered nurse to assistance nurse (RN/AN) ratio was 2.74, but a lot of variability was observed and in many units ANs operated in RNs positions. Only 42% of the nurses had participated at in-service continuing education programs and a systematic training program in cardio pulmonary resuscitation (CPR) was provided in only 12 (37.5%) units. The reported frequencies at which specific technical tasks were performed autonomously by nurses varied substantially and reflected a medium to low level of practice autonomy; the most frequently reported tasks were: peripheral IV line insertion, CPR chest compression, titration of vasoactive drugs and administration of analgesics. Higher percentages of nurses had received in-service training associated with the likelihood of performance of several technical tasks (P<0.03). Future studies need to explore the effect of these organisational characteristics on patient outcomes. The endorsement of nation-wide standards for nursing staffing and training in CICUs is imperative.

  18. A formative evaluation of the SWITCH® obesity prevention program: print versus online programming.

    PubMed

    Welk, Gregory J; Chen, Senlin; Nam, Yoon Ho; Weber, Tara E

    2015-01-01

    SWITCH® is an evidence-based childhood obesity prevention program that works through schools to impact parenting practices. The present study was designed as a formative evaluation to test whether an online version of SWITCH® would work equivalently as the established print version. Ten elementary schools were matched by socio-economic status and randomly assigned to receive either the print (n = 5) or online (n = 5) version. A total of 211 children from 22, 3(rd) grade classrooms were guided through the 4 month program by a team of program leaders working in cooperation with the classroom teachers. Children were tasked with completing weekly SWITCH® Trackers with their parents to monitor goal setting efforts in showing positive Do (≥60 minutes of moderate-to-vigorous physical activity), View (≤2 hours of screen time), and Chew (≥5 servings of fruits and vegetables) behaviors on each day. A total of 91 parents completed a brief survey to assess project-specific interactions with their child and the impact on their behaviors. The majority of parents (93.2%) reported satisfactory experiences with either the online or print SWITCH® program. The return rate for the SWITCH® Trackers was higher (42.5% ± 11%) from the print schools compared to the online schools (27.4% ± 10.9%). District program managers rated the level of teacher engagement in regards to program facilitation and the results showed a higher Trackers return rate in the highly engaged schools (38.5% ± 13.3%) than the lowly engaged schools (28.6 ± 11.9%). No significant differences were observed in parent/child interactions or reported behavior change (ps > .05) suggesting the equivalence in intervention effect for print and online versions of the SWITCH® program. The findings support the utility of the online SWITCH® platform but school-based modules are needed to facilitate broader school engagement by classroom teachers and PE teachers.

  19. Archeological Inundation Studies: Manual for Reservoir Managers

    DTIC Science & Technology

    1989-09-01

    Impact Research Program (EIRP), under Work Unit 32357. Dr. John B. Bushman, Mr. David P. Barlow, and Mr. Dave Mathis, HQUSACE, are the EIRP Technical...Santa Fe, NM. Padgett , Thomas J. 1978. Blue Mountain Lake: An Archeological Survey and an Experimental Study of Inundation Impacts, Research Report No...NUMBERS PROGRAM PROJECT TASK WORK UNIT Washington, DC 20314-1000 ELEMENT NO. NO. NO. ACCESSION NO. _I I IEIRP 32357 11 TITLE (Include Security

  20. Coal gasification systems engineering and analysis. Appendix H: Work breakdown structure

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.

  1. Database Management in Design Optimization.

    DTIC Science & Technology

    1983-10-30

    processing program(s) engaged in the task of preparing input data for the (finite-element) analysis and optimization phases primary storage the main...and extraction of data from the database for further processing . It can be divided into two phases: a) The process of selection and identification of ...user wishes to stop the reading or the writing process . The meaning of END depends on the method specified for retrieving data: a) Row-wise - then

  2. Human Research Program Human Health Countermeasures Element Sensorimotor Risk Standing Review Panel (SRP) Final Report

    NASA Technical Reports Server (NTRS)

    Peterson, Barry

    2009-01-01

    The Sensorimotor Risk Standing Review Panel (SRP) met at the NASA Johnson Space Center on October 4-6, 2009 to discuss the areas of future research targeted by the Human Health Countermeasures (HHC) Element of the Human Research Program (HRP). Using evidence-based knowledge as a background for risks, NASA had identified gaps in knowledge to address those risks. Ongoing and proposed tasks were presented to address the gaps. The charge to the Sensorimotor Risk SRP was to review the gaps, evaluate whether the tasks addressed these gaps and to make recommendations to NASA s HRP Science Management Office regarding the SRP's review. The SRP was requested to evaluate the practicality of the proposed efforts in light of the realistic demands placed on the HRP. In short, all tasks presented in the Integrated Research Plan (IRP) should address specific risks related to the challenges faced by the astronauts as a result of prolonged exposure to microgravity. All tasks proposed to fill the gaps in knowledge should provide applied, translational data necessary to address the specific risks. Several presentations were made to the SRP during the site visit and the SRP spent sufficient time to address the panel charge, either as a group or in separate sessions. The SRP made a final debriefing to the HRP Program Scientist. Taking the evidence and the risk as givens, the SRP reached the following conclusions: 1) the panel is very supportive of and endorses the present activities of the Sensorimotor Risk; and the panel is likewise supportive of the gaps and associated tasks in the IRP; 2) overall, the tasks addressed the gaps in the IRP; 3) there were some gaps and tasks that merit further enhancement and some new gaps/tasks that the SRP recommends.

  3. FY16 ASME High Temperature Code Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swindeman, M. J.; Jetter, R. I.; Sham, T. -L.

    2016-09-01

    One of the objectives of the ASME high temperature Code activities is to develop and validate both improvements and the basic features of Section III, Division 5, Subsection HB, Subpart B (HBB). The overall scope of this task is to develop a computer program to be used to assess whether or not a specific component under specified loading conditions will satisfy the elevated temperature design requirements for Class A components in Section III, Division 5, Subsection HB, Subpart B (HBB). There are many features and alternative paths of varying complexity in HBB. The initial focus of this task is amore » basic path through the various options for a single reference material, 316H stainless steel. However, the program will be structured for eventual incorporation all the features and permitted materials of HBB. Since this task has recently been initiated, this report focuses on the description of the initial path forward and an overall description of the approach to computer program development.« less

  4. U.S. Strategic Nuclear Forces: Background, Developments, and Issues

    DTIC Science & Technology

    2014-05-15

    5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7...cover targets in and around Asia. It also has undertaken efforts to extend the life of the missiles and warheads so that they and the submarines can...that the Air Force had to “keep a robust test program all the way through the life of the program.”29 With the test assets available before this

  5. Cellulosic-Derived Biofuels Program in Kentucky - Part 2

    DTIC Science & Technology

    2014-04-30

    and lignin, are complex raw materials. Selection of robust strains of algae that are able to convert C6 (glucose) and C5 carbohydrates from...13 Task B2.03 Development of Metalloporphyrin-Ionic Liquid Complexes for Degradation of Biomass . 14 Task B2.04 –Biomass Conversion Process Scale...Up ............................................................................. 15 Task B3: Carbohydrate to Oil Conversion Process Development

  6. Filter Effectiveness Evaluation

    DTIC Science & Technology

    2013-08-01

    Bramer U.S. Army TARDEC Force Projection Technologies Warren, Michigan Contract No. W56HZV-09- C -0100 (WD17-Task 7) UNCLASSIFIED...No. W56HZV-09- C -0100 (WD17-Task 7) SwRI® Project No. 08.14734.17.290 UNCLASSIFIED: Distribution Statement A. Approved for public release...W56HZV-09- C -0100 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Canant, Philip A.; Bessee, Gary B.; Hutzler, Scott A. 5d. PROJECT

  7. Inter-association Task Force recommendations on emergency preparedness and management of sudden cardiac arrest in high school and college athletic programs: a consensus statement.

    PubMed

    Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J

    2007-01-01

    To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishment of an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of on-site responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.

  8. Inter Association Task Force recommendations on emergency preparedness and management of sudden cardiac arrest in high school and college athletic programs: a consensus statement.

    PubMed

    Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J

    2007-01-01

    To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishing an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination, and integration of on-site responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.

  9. Inter-association task force recommendations on emergency preparedness and management of sudden cardiac arrest in high school and college athletic programs: a consensus statement.

    PubMed

    Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J

    2007-04-01

    To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishing an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of onsite responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.

  10. Inter-Association Task Force Recommendations on Emergency Preparedness and Management of Sudden Cardiac Arrest in High School and College Athletic Programs: A Consensus Statement

    PubMed Central

    Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J

    2007-01-01

    Objective: To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Background: Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Recommendations: Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishment of an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of on-site responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated. PMID:17597956

  11. A System Approach to Navy Medical Education and Training. Appendix 5. Neuropsychiatric Technician.

    DTIC Science & Technology

    1974-08-31

    phrased behavioral statements. Through the use of special programs, task inventories are prepared, printouts for special purposes are created following ...the Response Guide (p. xiii) at the perforation, and use the correct side to respond to each task or instrument found on the following white pages...response data. They can be processed and manipulated only by high speed computer capability using rigorously designed specialty programs. In addition to

  12. Security Assistance: Evaluations Needed to Determine Effectiveness of U.S. Aid to Lebanon’s Security Forces

    DTIC Science & Technology

    2013-03-01

    5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...meet conditions on the ground, according to U.S. officials. For example , the Department of State (State) delayed committing Foreign Military...agencies measure program performance. For example , GAO found in 2011 that the IMET program evaluation efforts had few of the elements commonly

  13. Multiadaptive Plan (MAP) IMRT to Accommodate Independent Movement of the Prostate and Pelvic Lymph Nodes

    DTIC Science & Technology

    2010-12-01

    the second Innovative Minds in Prostate Cancer Today (IMPaCT) conference, sponsored by prostate cancer research program of USAMRMC (Appendix B...presentation in the second Innovative Minds in Prostate Cancer Today (IMPaCT) conference, sponsored by prostate cancer research program of USAMRMC...NUMBER W81XWH-08-1-0358 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Ping Xia 5d. PROJECT NUMBER Xiap@ccf.org 5e. TASK NUMBER 5f. WORK

  14. Commonwealth of the Northern Mariana Islands Energy Action Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

  15. TU-AB-BRD-00: Task Group 100

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2015-06-15

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before amore » failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.« less

  16. Evaluation of social interaction, task management, and trust among dental hygiene students in a collaborative learning environment.

    PubMed

    Saylor, Catherine D; Keselyak, Nancy T; Simmer-Beck, Melanie; Tira, Daniel

    2011-02-01

    The purpose of this study was to evaluate the impact of collaborative learning on the development of social interaction, task management, and trust in dental hygiene students. These three traits were assessed with the Teamwork Assessment Scale in two different learning environments (traditional lecture/lab and collaborative learning environment). A convenience sample of fifty-six entry-level dental hygiene students taking an introductory/preclinic course at two metropolitan area dental hygiene programs provided comparable experimental and control groups. Factor scores were computed for the three traits, and comparisons were conducted using the Ryan-Einot-Gabriel-Welsh multiple comparison procedure among specific cell comparisons generated from a two-factor repeated measures ANOVA. The results indicate that the collaborative learning environment influenced dental hygiene students positively regarding the traits of social interaction, task management, and trust. However, comparing dental hygiene students to undergraduate students overall indicates that dental hygiene students already possess somewhat higher levels of these traits. Future studies on active learning strategies should examine factors such as student achievement and explore other possible active learning methodologies.

  17. Future Of Privatized Warfare

    DTIC Science & Technology

    2016-05-26

    5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Eric M. Peterson, Major, U.S. Air Force 5d. PROJECT NUMBER 5e. TASK NUMBER...Henry A. Arnold III, COL, IN Accepted this 26th day of May 2016 by: ___________________________________, Director, Graduate Degree Programs Robert...determination or copyright permission has been obtained for the inclusion of pictures, maps, graphics, and any other works incorporated into this

  18. Loglines. July-August 2013

    DTIC Science & Technology

    2013-08-01

    activities worldwide and industry customers of DLA. Contents of this publication are not necessarily the official views of, or endorsed by, the U.S...100 million for three months straight June • MRAP Stock Optimization Team established to maintain industrial readiness between the joint program ...SUBTITLE Loglines. July-August 2013 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK

  19. Managing the "Performance" in Performance Management.

    ERIC Educational Resources Information Center

    Repinski, Marilyn; Bartsch, Maryjo

    1996-01-01

    Describes a five-step approach to performance management which includes (1) redefining tasks; (2) identifying skills; (3) determining what development tools are necessary; (4) prioritizing skills development; and (5) developing an action plan. Presents a hiring model that includes job analysis, job description, selection, goal setting, evaluation,…

  20. A visiting scientist program for the burst and transient source experiment

    NASA Technical Reports Server (NTRS)

    Kerr, Frank J.

    1995-01-01

    During this project, Universities Space Research Association provided program management and the administration for overseeing the performance of the total contractual effort. The program director and administrative staff provided the expertise and experience needed to efficiently manage the program.USRA provided a program coordinator and v visiting scientists to perform scientific research with Burst and Transient Source Experiment (BATSE) data. This research was associated with the primary scientific objectives of BATSE and with the various BATSE collaborations which were formed in response to the Compton Gamma Ray Observatory Guest Investigator Program. USRA provided administration for workshops, colloquia, the preparation of scientific documentation, etc. and also provided flexible program support in order to meet the on-going needs of MSFC's BATSE program. USRA performed tasks associated with the recovery, archiving, and processing of scientific data from BATSE. A bibliography of research in the astrophysics discipline is attached as Appendix 1. Visiting Scientists and Research Associates performed activities on this project, and their technical reports are attached as Appendix 2.

  1. Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1

    NASA Technical Reports Server (NTRS)

    Estes, Ronald H. (Editor)

    1993-01-01

    This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.

  2. Situation awareness measures for simulated submarine track management.

    PubMed

    Loft, Shayne; Bowden, Vanessa; Braithwaite, Janelle; Morrell, Daniel B; Huf, Samuel; Durso, Francis T

    2015-03-01

    The aim of this study was to examine whether the Situation Present Assessment Method (SPAM) and the Situation Awareness Global Assessment Technique (SAGAT) predict incremental variance in performance on a simulated submarine track management task and to measure the potential disruptive effect of these situation awareness (SA) measures. Submarine track managers use various displays to localize and track contacts detected by own-ship sensors. The measurement of SA is crucial for designing effective submarine display interfaces and training programs. Participants monitored a tactical display and sonar bearing-history display to track the cumulative behaviors of contacts in relationship to own-ship position and landmarks. SPAM (or SAGAT) and the Air Traffic Workload Input Technique (ATWIT) were administered during each scenario, and the NASA Task Load Index (NASA-TLX) and Situation Awareness Rating Technique were administered postscenario. SPAM and SAGAT predicted variance in performance after controlling for subjective measures of SA and workload, and SA for past information was a stronger predictor than SA for current/future information. The NASA-TLX predicted performance on some tasks. Only SAGAT predicted variance in performance on all three tasks but marginally increased subjective workload. SPAM, SAGAT, and the NASA-TLX can predict unique variance in submarine track management performance. SAGAT marginally increased subjective workload, but this increase did not lead to any performance decrement. Defense researchers have identified SPAM as an alternative to SAGAT because it would not require field exercises involving submarines to be paused. SPAM was not disruptive, but it is potentially problematic that SPAM did not predict variance in all three performance tasks. © 2014, Human Factors and Ergonomics Society.

  3. User-centered development of a smart phone mobile application delivering personalized real-time advice on sun protection.

    PubMed

    Buller, David B; Berwick, Marianne; Shane, James; Kane, Ilima; Lantz, Kathleen; Buller, Mary Klein

    2013-09-01

    Smart phones are changing health communication for Americans. User-centered production of a mobile application for sun protection is reported. Focus groups (n = 16 adults) provided input on the mobile application concept. Four rounds of usability testing were conducted with 22 adults to develop the interface. An iterative programming procedure moved from a specification document to the final mobile application, named Solar Cell. Adults desired a variety of sun protection advice, identified few barriers to use and were willing to input personal data. The Solar Cell prototype was improved from round 1 (seven of 12 tasks completed) to round 2 (11 of 12 task completed) of usability testing and was interoperable across handsets and networks. The fully produced version was revised during testing. Adults rated Solar Cell as highly user friendly (mean = 5.06). The user-centered process produced a mobile application that should help many adults manage sun safety.

  4. High-Pressure Turbulent Flame Speeds and Chemical Kinetics of Syngas Blends with and without Impurities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, Eric; Mathieu, Olivier; Morones, Anibal

    This Final Report documents the entire four years of the project, from October 1, 2013 through September 30, 2017. This project was concerned with the chemical kinetics of fuel blends with high-hydrogen content in the presence of impurities. Emphasis was also on the design and construction of a new, high-pressure turbulent flame speed facility and the use of ignition delay times and flame speeds to elucidate the diluent and impurity effects on the fuel chemistry at gas turbine engine conditions and to also validate the chemical kinetics models. The project was divided into five primary tasks: 1) Project Management andmore » Program Planning; 2) Turbulent Flame Speed Measurements at Atmospheric Pressure; 3) Experiments and Kinetics of Syngas Blends with Impurities; 4) Design and Construction of a High-Pressure Turbulent Flame Speed Facility; and 5) High-Pressure Turbulent Flame Speed Measurements. Details on the execution and results of each of these tasks are provided in the main report.« less

  5. 14 CFR § 1214.1706 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Program management. § 1214.1706 Section Â... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  6. Outcomes of a proficiency-based skills curriculum at the beginning of the fourth year for senior medical students entering surgery.

    PubMed

    Wade, Thomas J; Lorbeer, Karly; Awad, Michael M; Woodhouse, Julie; DeClue, Angela; Brunt, L Michael

    2015-10-01

    We hypothesized that a proficiency-based curriculum administered early in the fourth year to senior medical students (MS4) would achieve outcomes comparable to a similar program administered during surgical internship. MS4 (n = 18) entering any surgical specialty enrolled in a proficiency-based skills curriculum at the beginning of the fourth year that included suturing/knot-tying, on-call problems, laparoscopic, and other skills (urinary catheter, sterile prep/drape, IV placement, informed consent, electrosurgical use). Assessment was at 4-12 weeks after training by a modified Objective Structured Assessment of Technical Skills (OSATS). Suturing and knot tying tasks were assessed by time and OSATS technical proficiency (TP) scores (1 [novice], 3 [proficient], 5 [expert]). Outcomes were compared with PGY-1 residents who received similar training at the beginning of internship and assessment 4-12 weeks later. Data are presented as mean values ± standard deviation; statistical significance was assessed by Student's t test. Fifteen of 18 MS4 (83%) reached proficiency on all 15 tasks, and 2 others were proficient on all but 1 laparoscopic task. Compared with PGY-1s, MS4 were significantly faster for 3 of 5 suturing and tying tasks and total task time (547 ± 63 vs 637 ± 127 s; P < .05). Mean TP scores were similar for both groups (MS4, 3.4 ± 0.5 vs PGY-1, 3.1 ± .57; P = NS). MS4 OSATS scores were higher for IV placement, informed consent, and urinary catheter placement, but lower for prep and drape and for management of on-call problems. MS4 who participate in a proficiency-based curriculum taught early in the fourth year are able to meet proficiency targets in a high percentage of cases. This approach should better prepare MS4 for surgical internship. Copyright © 2015 Elsevier Inc. All rights reserved.

  7. Socioeconomic impact assessment in ex ante evaluations: a case study on the rural development programs of the European Union.

    PubMed

    Vidueira, Pablo; Díaz-Puente, José M; Rivera, María

    2014-08-01

    Ex ante impact assessment has become a fundamental tool for effective program management, and thus, a compulsory task when establishing a new program in the European Union (EU). This article aims to analyze benefits from ex ante impact assessment, methodologies followed, and difficulties encountered. This is done through the case study on the rural development programs (RDPs) in the EU. Results regarding methodologies are then contrasted with the international context in order to provide solid insights to evaluators and program managing authorities facing ex ante impact assessment. All European RDPs from the period 2007 through 2013 (a total of 88) and their corresponding available ex ante evaluations (a total of 70) were analyzed focusing on the socioeconomic impact assessment. Only 46.6% of the regions provide quantified impact estimations on socioeconomic impacts in spite of it being a compulsory task demanded by the European Commission (EC). Recommended methods by the EC are mostly used, but there is a lack of mixed method approaches since qualitative methods are used in substitution of quantitative ones. Two main difficulties argued were the complexity of program impacts and the lack of needed program information. Qualitative approaches on their own have been found as not suitable for ex ante impact assessment, while quantitative approaches-such as microsimulation models-provide a good approximation to actual impacts. However, time and budgetary constraints make that quantitative and mixed methods should be mainly applied on the most relevant impacts for the program success. © The Author(s) 2014.

  8. Public health program planning logic model for community engaged type 2 diabetes management and prevention.

    PubMed

    West, Joseph F

    2014-02-01

    Diabetes remains a growing epidemic with widening health inequity gaps in disease management, self-management knowledge, access to care and outcomes. Yet there is a paucity of evaluation tools for community engaged interventions aimed at closing the gaps and improving health. The Guide to Community Preventive Services (the Community Guide) developed by the Task Force on Community Preventive Services (the Task Force) at the Centers for Disease Control and Prevention (CDC) recommends two healthcare system level interventions, case management interventions and disease management programs, to improve glycemic control. However, as a public health resource guide for diabetes interventions a model for community engagement is a glaringly absent component of the Community Guide recommendations. In large part there are few evidence-based interventions featuring community engagement as a practice and system-level focus of chronic disease and Type 2 diabetes management. The central argument presented in this paper is that the absence of these types of interventions is due to the lack of tools for modeling and evaluating such interventions, especially among disparate and poor populations. A conceptual model emphasizing action-oriented micro-level community engagement is needed to complement the Community Guide and serve as the basis for testing and evaluation of these kinds of interventions. A unique logic model advancing the Community Guide diabetes recommendations toward measureable and sustainable community engagement for improved Type 2 diabetes outcomes is presented. Copyright © 2013 Elsevier Ltd. All rights reserved.

  9. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2009-04-07

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs...statements among others, although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS

  10. Mobile Robot Enabled Detection of Explosives and Biological Agents

    DTIC Science & Technology

    2006-11-01

    Detection of Explosives and Biological Agents 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e...TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Wayne State University, SSIM Program, Detroit, Michigan 48202 8...PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR

  11. Small Business Procurement Event

    DTIC Science & Technology

    2014-08-13

    Small Business Procurement Event 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the Navy,Office of Small Business Programs,720 Kennon...distribution unlimited 13. SUPPLEMENTARY NOTES NDIA 27th Navy Gold Coast Small Business Procurement Event, 12-13 Aug 2014, San Diego, CA. 14. ABSTRACT

  12. Locating Health Resources. Teenage Health Teaching Modules.

    ERIC Educational Resources Information Center

    Education Development Center, Inc., Newton, MA.

    The Teenage Health Teaching Modules (THTM) program is a health education curriculum for adolescents. Each THTM module frames an adolescent health task emphasizing development of self-assessment, communication, decision making, health advocacy, and self-management. This module offers information on how young people may avail themselves of community…

  13. Air Force Tech Order Management System (AFTOMS). Automation Plan-Final Report. Version 1.0

    DOT National Transportation Integrated Search

    1988-02-01

    Computer aided Acquisition and Logistics Support (CALS) is a Department of Defense (DoD) program designed to improve weapon systems support through digital automation. In June 1985, the joint industry/DoD Task Force on CALS issued a five volume repor...

  14. Promoting Health in Families. Teenage Health Teaching Modules.

    ERIC Educational Resources Information Center

    Education Development Center, Inc., Newton, MA.

    The Teenage Health Teaching Modules (THTM) program is a health education curriculum for adolescents. Each THTM module frames an adolescent health task emphasizing development of self-assessment, communication, decision making, health advocacy, and self-management. This module is designed to help the classroom teacher introduce health-promoting…

  15. Quantitative software models for the estimation of cost, size, and defects

    NASA Technical Reports Server (NTRS)

    Hihn, J.; Bright, L.; Decker, B.; Lum, K.; Mikulski, C.; Powell, J.

    2002-01-01

    The presentation will provide a brief overview of the SQI measurement program as well as describe each of these models and how they are currently being used in supporting JPL project, task and software managers to estimate and plan future software systems and subsystems.

  16. Handling Stress. Teenage Health Teaching Modules.

    ERIC Educational Resources Information Center

    Education Development Center, Inc., Newton, MA.

    The Teenage Health Teaching Modules (THTM) program is a health education curriculum for adolescents. Each THTM module frames an adolescent health task emphasizing development of self-assessment, communication, decision making, health advocacy, and self-management. This module attempts to help adolescents understand the meaning of stress in their…

  17. Use of relational agents to improve family communication in type 1 diabetes: Methods

    USDA-ARS?s Scientific Manuscript database

    Physiological and environmental risk factors interact to undermine blood glucose control during early adolescence. This has been documented to be associated with family conflict and poor adherence to diabetes management tasks. Family Teamwork is an efficacious program demonstrated to enhance family ...

  18. Chinese Preservice Teachers’ Professional Identity Links with Education Program Performance: The Roles of Task Value Belief and Learning Motivations

    PubMed Central

    Zhang, Yan; Hawk, Skyler T.; Zhang, Xiaohui; Zhao, Hongyu

    2016-01-01

    Professional identity is a key issue spanning the entirety of teachers’ career development. Despite the abundance of existing research examining professional identity, its link with occupation-related behavior at the primary career stage (i.e., GPA in preservice education) and the potential process that underlies this association is still not fully understood. This study explored the professional identity of Chinese preservice teachers, and its links with task value belief, intrinsic learning motivation, extrinsic learning motivation, and performance in the education program. Grade-point average (GPA) of courses (both subject and pedagogy courses) was examined as an indicator of performance, and questionnaires were used to measure the remaining variables. Data from 606 preservice teachers in the first 3 years of a teacher-training program indicated that: (1) variables in this research were all significantly correlated with each other, except the correlation between intrinsic learning motivation and program performance; (2) professional identity was positively linked to task value belief, intrinsic and extrinsic learning motivations, and program performance in a structural equation model (SEM); (3) task value belief was positively linked to intrinsic and extrinsic learning motivation; (4) higher extrinsic (but not intrinsic) learning motivation was associated with increased program performance; and (5) task value belief and extrinsic learning motivation were significant mediators in the model. PMID:27199810

  19. Chinese Preservice Teachers' Professional Identity Links with Education Program Performance: The Roles of Task Value Belief and Learning Motivations.

    PubMed

    Zhang, Yan; Hawk, Skyler T; Zhang, Xiaohui; Zhao, Hongyu

    2016-01-01

    Professional identity is a key issue spanning the entirety of teachers' career development. Despite the abundance of existing research examining professional identity, its link with occupation-related behavior at the primary career stage (i.e., GPA in preservice education) and the potential process that underlies this association is still not fully understood. This study explored the professional identity of Chinese preservice teachers, and its links with task value belief, intrinsic learning motivation, extrinsic learning motivation, and performance in the education program. Grade-point average (GPA) of courses (both subject and pedagogy courses) was examined as an indicator of performance, and questionnaires were used to measure the remaining variables. Data from 606 preservice teachers in the first 3 years of a teacher-training program indicated that: (1) variables in this research were all significantly correlated with each other, except the correlation between intrinsic learning motivation and program performance; (2) professional identity was positively linked to task value belief, intrinsic and extrinsic learning motivations, and program performance in a structural equation model (SEM); (3) task value belief was positively linked to intrinsic and extrinsic learning motivation; (4) higher extrinsic (but not intrinsic) learning motivation was associated with increased program performance; and (5) task value belief and extrinsic learning motivation were significant mediators in the model.

  20. Improving quality management systems of laboratories in developing countries: an innovative training approach to accelerate laboratory accreditation.

    PubMed

    Yao, Katy; McKinney, Barbara; Murphy, Anna; Rotz, Phil; Wafula, Winnie; Sendagire, Hakim; Okui, Scolastica; Nkengasong, John N

    2010-09-01

    The Strengthening Laboratory Management Toward Accreditation (SLMTA) program was developed to promote immediate, measurable improvement in laboratories of developing countries. The laboratory management framework, a tool that prescribes managerial job tasks, forms the basis of the hands-on, activity-based curriculum. SLMTA is implemented through multiple workshops with intervening site visits to support improvement projects. To evaluate the effectiveness of SLMTA, the laboratory accreditation checklist was developed and subsequently adopted by the World Health Organization Regional Office for Africa (WHO AFRO). The SLMTA program and the implementation model were validated through a pilot in Uganda. SLMTA yielded observable, measurable results in the laboratories and improved patient flow and turnaround time in a laboratory simulation. The laboratory staff members were empowered to improve their own laboratories by using existing resources, communicate with clinicians and hospital administrators, and advocate for system strengthening. The SLMTA program supports laboratories by improving management and building preparedness for accreditation.

Top