Sample records for task order contract

  1. 48 CFR 217.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...)(i) Notwithstanding FAR 17.204(e), the ordering period of a task order or delivery order contract...) of this section does not apply to the following: (A) Contracts, including task or delivery order contracts, awarded under other statutory authority. (B) Advisory and assistance service task order contracts...

  2. 48 CFR 316.505 - Ordering.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT TYPES TYPES OF CONTRACTS Indefinite-Delivery Contracts 316.505 Ordering. (b)(5) The HHS task-order and delivery-order ombudsman is the Director, Strategic Acquisition Service, PSC. The task-order and... of Performance Accountability, Resources and Technology ASPR/OAMCG: Chief of Acquisition Policy CDC...

  3. 48 CFR 5.703 - Definition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PUBLICIZING CONTRACT ACTIONS Publicizing Requirements under the American Recovery and Reinvestment Act of 2009 5.703 Definition. As used in this subpart— Task or delivery order contract means a “delivery order contract,” and a “task order contract,” as defined in 16.501-1. For example, it includes Governmentwide...

  4. 48 CFR 5.703 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PUBLICIZING CONTRACT ACTIONS Publicizing Requirements under the American Recovery and Reinvestment Act of 2009 5.703 Definition. As used in this subpart— Task or delivery order contract means a “delivery order contract,” and a “task order contract,” as defined in 16.501-1. For example, it includes Governmentwide...

  5. 48 CFR 1352.216-74 - Task orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... changes can be made. (g) Task orders may be placed during the period of performance of the contract. Labor... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Task orders. 1352.216-74... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.216-74 Task orders. As...

  6. 48 CFR 16.501-1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maximum quantity) and that provides for the issuance of orders for the performance of tasks during the... of orders for the delivery of supplies during the period of the contract. Task-order contract means a...

  7. 10 CFR 1706.7 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... decline to approve performance of a particular task by the contractor if an actual or potential OCI is...) Terminate the contract, or, in the case of a task order contract, terminate the particular task; (ii) Insist... contractor to continue to perform the contract (or task) under the waiver provisions of § 1706.8, and, where...

  8. 48 CFR 516.506 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... items, when the contract authorizes FAS and other activities to issue delivery or task orders, insert the clause at 552.216-72, Placement of Orders. If only FAS will issue delivery or task orders, insert... Program items and in other FAS Program solicitations. [75 FR 41096, July 15, 2010] ...

  9. 48 CFR 516.506 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... items, when the contract authorizes FAS and other activities to issue delivery or task orders, insert the clause at 552.216-72, Placement of Orders. If only FAS will issue delivery or task orders, insert... Program items and in other FAS Program solicitations. [75 FR 41096, July 15, 2010] ...

  10. 48 CFR 516.506 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... items, when the contract authorizes FAS and other activities to issue delivery or task orders, insert the clause at 552.216-72, Placement of Orders. If only FAS will issue delivery or task orders, insert... Program items and in other FAS Program solicitations. [75 FR 41096, July 15, 2010] ...

  11. 48 CFR 516.506 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... items, when the contract authorizes FAS and other activities to issue delivery or task orders, insert the clause at 552.216-72, Placement of Orders. If only FAS will issue delivery or task orders, insert... Program items and in other FAS Program solicitations. [75 FR 41096, July 15, 2010] ...

  12. 48 CFR 516.506 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... items, when the contract authorizes FAS and other activities to issue delivery or task orders, insert the clause at 552.216-72, Placement of Orders. If only FAS will issue delivery or task orders, insert... Program items and in other FAS Program solicitations. [75 FR 41096, July 15, 2010] ...

  13. 78 FR 46792 - Federal Acquisition Regulation; Repeal of Sunset for Certain Protests of Task or Delivery Order...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... Defense Authorization Act (NDAA) for Fiscal Year 2013. This section removes the sunset date for protests against certain orders under a task-order contract or delivery-order contract for title 10 agencies only... agencies covered by title 10 of the United States Code, namely DoD, NASA, and Coast Guard. This section...

  14. 48 CFR 2452.216-75 - Unpriced task orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Unpriced task orders. 2452... 2452.216-75 Unpriced task orders. As prescribed in 2416.506-70(a), insert the following clause: Unpriced Task Orders (FEB 2006) (a) Prior to the issuance of a task order under this contract, it is...

  15. 48 CFR 52.215-22 - Limitations on Pass-Through Charges-Identification of Subcontract Effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The offeror's proposal shall exclude excessive pass-through charges. (c) Performance of work by the..., under the contract, task order, or delivery order. (2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery...

  16. 48 CFR 1852.216-80 - Task ordering procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specified in the schedule. The Contractor may incur costs under this contract in performance of task orders... contemplated task order. (2) Proposed performance standards to be used as criteria for determining whether the... the task order, including special instructions or other information necessary for performance of the...

  17. 48 CFR 237.170-2 - Approval requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-2 Approval requirements. (a) Acquisition of services through a contract or task order that is not performance based. (1) For acquisitions at or below $85.5 million, obtain the approval of the official... the senior procurement executive. (b) Acquisition of services through use of a contract or task order...

  18. 48 CFR 2052.216-73 - Accelerated task order procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the work, the contractor shall proceed with performance of the task order subject to the monetary... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Accelerated task order....216-73 Accelerated task order procedures. As prescribed at 2016.506-70(b), the contracting officer may...

  19. 48 CFR 42.1502 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... single-agency task order and delivery order contracts, the contracting officer may require performance... ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 42.1502 Policy. (a) Past performance... orders with a period of performance, including options, exceeding one year. These evaluations are...

  20. 48 CFR 17.501 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....501 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Interagency Acquisitions 17.501 General. (a) Interagency acquisitions are commonly conducted through indefinite-delivery contracts, such as task- and delivery-order...

  1. Avionics Simulation, Development and Software Engineering

    NASA Technical Reports Server (NTRS)

    Francis, Ronald C.; Settle, Gray; Tobbe, Patrick A.; Kissel, Ralph; Glaese, John; Blanche, Jim; Wallace, L. D.

    2001-01-01

    This monthly report summarizes the work performed under contract NAS8-00114 for Marshall Space Flight Center in the following tasks: 1) Purchase Order No. H-32831D, Task Order 001A, GPB Program Software Oversight; 2) Purchase Order No. H-32832D, Task Order 002, ISS EXPRESS Racks Software Support; 3) Purchase Order No. H-32833D, Task Order 003, SSRMS Math Model Integration; 4) Purchase Order No. H-32834D, Task Order 004, GPB Program Hardware Oversight; 5) Purchase Order No. H-32835D, Task Order 005, Electrodynamic Tether Operations and Control Analysis; 6) Purchase Order No. H-32837D, Task Order 007, SRB Command Receiver/Decoder; and 7) Purchase Order No. H-32838D, Task Order 008, AVGS/DART SW and Simulation Support

  2. 75 FR 60690 - Defense Federal Acquisition Regulation Supplement (DFARS); Electronic Ordering Procedures (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... event of conflict between a delivery order or task order and this contract, the contract shall control.... This change will ultimately help improve the management and promotion of electronic Government services... impose any information collection requirements that require the approval of the Office of Management and...

  3. 48 CFR 815.304-70 - Evaluation factor commitments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SDVOSBs; (2) Use past performance in meeting SDVOSB subcontracting goals as a non-price evaluation factor... as an evaluation factor when competitively negotiating the award of contracts or task or delivery... competitively negotiating the award of contracts or task or delivery orders. (b) If an offeror proposes to use...

  4. Improvised Explosive Devices: Unclear Whether Culvert Denial Systems to Protect Troops are Functioning or Were Ever Installed

    DTIC Science & Technology

    2013-07-23

    Regional Command-South. At least 4 of the contracts awarded by RCC-Kandahar were blanket purchase agreements ( BPA ) with multiple task orders against them...for the construction of culvert denial systems. Of the BPAs that we reviewed, both W91B4L-11-A-0031 (82 task orders) and W91B4L-11-A-0034 (14 task...orders) are no longer active. However, W91B4L-11-A-0033 (currently 117 task orders) and W91B4L-11-A-0037 (currently 198 task orders) are active BPAs

  5. Weaknesses in Oversight of Naval Sea Systems Command Ship Maintenance Contract in Southwest Asia

    DTIC Science & Technology

    2010-09-27

    task orders for engineering services under the contract to bank approximately $20.3 million in O& M funds. The task orders functioned as a way to bank...profit on repair parts obtained from IFM and has requested cost and pricing data to support that IFM has not charged FMSNA profit on the parts. In a ...Fincantieri.9 See the figure for a Fincantieri Corporate organizational chart that shows the relationship of FMSNA and IFM under the parent company

  6. Comparative Analysis of Multiple-Award Task Order Contracting and Its Impacts on Acquisition Reform

    DTIC Science & Technology

    2002-12-01

    24 Figure 2. DoD Improperly Directed Task Order Actions..... 49 Figure 3. Overview of the Domestic B2B Market, 1999-2003. 62 Figure 4...year 2000. The technology schedules amassed nearly $8.1 billion in sales with 60.8 percent of all activity. FSS charges agencies a one percent fee...second with $1 billion in sales . GSA manages five of the ten most lucrative contracts. The National Aeronautical Space Administration’s (NASA

  7. 13 CFR 124.510 - What percentage of work must a Participant perform on an 8(a) contract?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance of work percentage need not be met on task orders issued during the first six months of the... mean that the Participant must perform 50 percent of the applicable costs for each task order with its... costs for the combined total of all task orders issued to date at six month intervals. Example to...

  8. 48 CFR 5.301 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-source justification (excluding brand name) in accordance with 8.405-6; or (ii) Task or delivery orders... Innovation Development Act of 1982 (Pub. L. 97-219); (3) The contract action is an order placed under subpart... one source is available; (6) The contract action— (i) Is for an amount not greater than the simplified...

  9. 77 FR 8818 - Public Availability of Consumer Product Safety Commission FY 2011 Service Contract Inventory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... through a contract or task order; (B) The organizational component of the executive agency administering the contract, and the organizational component of the agency whose requirements are being met through contractor performance of the service; (C) The total dollar amount obligated for services under the contract...

  10. 48 CFR 2052.216-72 - Task order procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...; (5) Technical skills required; and (6) Estimated level of effort. (b) Task order technical proposal. By the date specified in the TORFP, the contractor shall deliver to the contracting officer a written or verbal (as specified in the TORFP technical proposal submittal instructions) technical proposal...

  11. Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Huy, Frank

    2000-01-01

    This document provides a project plan for the D.N. American response to Modification #1 to Contract Task Order #13 - Program Maintenance and Logistics for the Science and Engineering Technical Assessments (SETA) contract.

  12. 48 CFR 2416.406 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., 2452.216-73, Performance Evaluation Plan, and 2452.216-74, Distribution of Award Fee, in all award-fee... task or delivery orders, the Contracting Officer shall substitute the word “order” for the word...

  13. Grid Stiffened Structure Analysis Tool

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The Grid Stiffened Analysis Tool contract is contract performed by Boeing under NASA purchase order H30249D. The contract calls for a "best effort" study comprised of two tasks: (1) Create documentation for a composite grid-stiffened structure analysis tool, in the form of a Microsoft EXCEL spread sheet, that was developed by originally at Stanford University and later further developed by the Air Force, and (2) Write a program that functions as a NASTRAN pre-processor to generate an FEM code for grid-stiffened structure. In performing this contract, Task 1 was given higher priority because it enables NASA to make efficient use of a unique tool they already have; Task 2 was proposed by Boeing because it also would be beneficial to the analysis of composite grid-stiffened structures, specifically in generating models for preliminary design studies. The contract is now complete, this package includes copies of the user's documentation for Task 1 and a CD ROM & diskette with an electronic copy of the user's documentation and an updated version of the "GRID 99" spreadsheet.

  14. Collaborative Research and Development (CR&D). Task Order 0049: Tribological Modeling

    DTIC Science & Technology

    2008-05-01

    scratch test for TiN on stainless steel with better substrate mechanical properties. This present study was focused on the study of stress distribution...AFRL-RX-WP-TR-2010-4189 COLLABORATIVE RESEARCH AND DEVELOPMENT (CR&D) Task Order 0049: Tribological Modeling Young Sup Kang Universal...SUBTITLE COLLABORATIVE RESEARCH AND DEVELOPMENT (CR&D) Task Order 0049: Tribological Modeling 5a. CONTRACT NUMBER F33615-03-D-5801-0049 5b

  15. 48 CFR 252.228-7001 - Ground and flight risk.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracting Officer. (5) Flight crew member means the pilot, the co-pilot, and, unless otherwise provided in... includes any pilot or operator of an unmanned aerial vehicle. If required, a defense systems operator may.... (4) For task order and delivery order contracts, the Contractor's share of the loss shall be the...

  16. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  17. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  18. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  19. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  20. 48 CFR 1816.506-70 - NASA contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clause. 1816...-70 NASA contract clause. Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations... reporting (See NPR 9501.2, NASA Contractor Financial Management Reporting System), use the clause with its...

  1. 78 FR 33392 - Public Availability of Consumer Product Safety Commission FY 2012 Service Contract Inventory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ... made through a contract or task order; (B) The organizational component of the executive agency administering the contract, and the organizational component of the agency whose requirements are being met through contractor performance of the service; (C) The total dollar amount obligated for services under...

  2. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... investigator, the contract period of performance, and the period covered by the report. Each report must include the following for each discrete task/task order: (a) A listing of the efforts completed during the...

  3. Mechanism Design for Task Procurement with Flexible Quality of Service

    NASA Astrophysics Data System (ADS)

    Gerding, Enrico H.; Larson, Kate; Rogers, Alex; Jennings, Nicholas R.

    In this paper, we consider the problem where an agent wishes to complete a single computational task, but lacks the required resources. Instead, it must contract self-interested service providers, who are able to flexibly manipulate the quality of service they deliver, in order to maximise their own utility. We extend an existing model to allow for multiple such service providers to be contracted for the same task, and derive optimal task procurement mechanisms in the setting where the agent has full knowledge of the cost functions of these service providers (considering both simultaneous and sequential procurement). We then extend these results to the incomplete information setting where the agent must elicit cost information from the service providers, and we characterise a family of incentive-compatible and individually-rational mechanisms. We show empirically that sequential procurement always generates greater utility for the agent compared to simultaneous procurement, and that over a range of settings, contracting multiple providers is preferable to contracting just one.

  4. Real-time changes in corticospinal excitability related to motor imagery of a force control task.

    PubMed

    Tatemoto, Tsuyoshi; Tsuchiya, Junko; Numata, Atsuki; Osawa, Ryuji; Yamaguchi, Tomofumi; Tanabe, Shigeo; Kondo, Kunitsugu; Otaka, Yohei; Sugawara, Kenichi

    2017-09-29

    To investigate real-time excitability changes in corticospinal pathways related to motor imagery in a changing force control task, using transcranial magnetic stimulation (TMS). Ten healthy volunteers learnt to control the contractile force of isometric right wrist dorsiflexion in order to track an on-screen sine wave form. Participants performed the trained task 40 times with actual muscle contraction in order to construct the motor image. They were then instructed to execute the task without actual muscle contraction, but by imagining contraction of the right wrist in dorsiflexion. Motor evoked potentials (MEPs), induced by TMS in the right extensor carpi radialis muscle (ECR) and flexor carpi radialis muscle (FCR), were measured during motor imagery. MEPs were induced at five time points: prior to imagery, during the gradual generation of the imaged wrist dorsiflexion (Increasing phase), the peak value of the sine wave, during the gradual reduction (Decreasing phase), and after completion of the task. The MEP ratio, as the ratio of imaged MEPs to resting-state, was compared between pre- and post-training at each time point. In the ECR muscle, the MEP ratio significantly increased during the Increasing phase and at the peak force of dorsiflexion imagery after training. Moreover, the MEP ratio was significantly greater in the Increasing phase than in the Decreasing phase. In the FCR, there were no significant consistent changes. Corticospinal excitability during motor imagery in an isometric contraction task was modulated in relation to the phase of force control after image construction. Copyright © 2017 Elsevier B.V. All rights reserved.

  5. Thirteen Week Oral Toxicity Study of WR238605 with a Thirteen Week Recovery Period in Rats. Volume 3 of 3

    DTIC Science & Technology

    1993-06-18

    Page 1 REVISED PAGE A u STUDY Mfr CBM, INITIAL (77 DATE-y-Hl^. 5.0 7.0 Contract No.: DAMD17-92-C-2C01 Task Order No.: UIC-5B Study No.: 098 ® i...Report. The results will not be Page 6 REVISED PAGE /?. STUDY Mfr 2M INITIAL: (jLL i OATF- \\yjuftl.’ I I 1’ II II II II II II II...necessary) recovery animals. . Page 7 REVISED PAGE A,. INITIALIZE cninvwyO^g DATE: ><-/*’ fr ?. i u JU ft Contract No. Task Order No. Study No

  6. Defense Contracting in Iraq: Issues and Options for Congress

    DTIC Science & Technology

    2008-05-06

    ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public...contract calls for the three companies to compete for task orders; each company may be awarded up to $5 billion for troop support services per year , the...contracting. The Fiscal Year (FY) 2008 Defense Authorization Act (P.L. 110-181) contains provisions that address contract waste, fraud, abuse, and

  7. Government Contracting Should Be a Core Competence for U.S. Military Personnel

    DTIC Science & Technology

    2014-12-01

    selves may have distorted the local market , creating inflation problems in the region.65 Thus, long-term projects or services that are to be turned...are injected into the process to avoid rampant single-award-task and-delivery order contracts that effectively inject monopolistic -type pricing

  8. 75 FR 10190 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Acquisition Regulation Supplement; Payment of Costs Prior to Definitization-Definition of Contract Action... the definition of ``contract action'' at DFARS 217.7401. This is not a significant regulatory action... paragraph (a)(3) to read as follows: 217.7401 Definitions. * * * * * (a) * * * (2) It includes task orders...

  9. 78 FR 61113 - Acquisition Process: Task and Delivery Order Contracts, Bundling, Consolidation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... that a total set-aside is not appropriate but the procurement can be broken up into smaller discrete... discrete components to support a partial set-aside and market research shows that either: at least two... could divide a multiple award contract for divergent goods and services into discrete categories (which...

  10. Social Influences on Creativity: Interactive Effects of Reward and Choice.

    ERIC Educational Resources Information Center

    Amabile, Teresa M.

    In a test of intrinsic motivation hypothesis of creativity, 60 undergraduate women did an artistic creativity task with either the expectation of receiving a reward or no expectation of reward. Reward was crossed with choice in task engagement, such that half of the reward Ss contracted to do the task in order to receive reward, and half simply…

  11. Too Good to be Used: Analyzing Utilization of the Test Program for Certain Commercial Items in the Air Force

    DTIC Science & Technology

    2014-12-01

    This data element is required for all Delivery/Task orders and BPA calls. It is not required for a DCA, Purchase Order, and a Modification. Enter the...only populated when the action is a delivery order, task order, or blanket purchase agreement ( BPA ) call against an existing contract or agreement...vehicles such as BPAs and ID/IQs reduced the number of actions to 3,508. As non-commercial acquisitions were removed, the total number of actions eligible

  12. What are the Effects of Protest Fear?

    DTIC Science & Technology

    2014-06-01

    Program AT&L Acquisition, Technology, and Logistics BPA blanket purchase agreement CONUS continental United States COR...they have awarded a task/delivery order against an IDIQ contract (or Blanket Purchase Agreement [ BPA ]) in order to avoid a bid protest. The data shows

  13. NAVSUP Global Logistics Support

    DTIC Science & Technology

    2012-08-01

    Support $3.5 M Ill SB Contracting Actions Ill SB Value 35% of total spend to Small Business ! NAVAL SUPPLY SYSTEMS COMMAND • Procurement • Barge...Other services now using as well • Awarded Aug 2011, Features: • 100% Sma II Business Set Aside ! • 25 multiple award task order contracts to 8...UP- GLOBAL LOGISTICS I · -~ --; •• ~.c. SUPPORT ,.. NAVAL SUPPLY SYSTEMS COMMAND Fiscal Year 2011 Small Business Contracting Spend: 28,000 actions

  14. Defense Contracting in Iraq: Issues and Options for Congress

    DTIC Science & Technology

    2008-05-21

    ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public...contract calls for the three companies to compete for task orders; each company may be awarded up to $5 billion for troop support services per year , the...examine several bills to ensure proper accountability and oversight in federal contracting. The Fiscal Year (FY) 2008 Defense Authorization Act (P.L

  15. Counter Narcoterrorism Technology Program Office Task Orders Had Excess Fees, and the Army Was Incorrectly Billed

    DTIC Science & Technology

    2011-11-01

    604-8932, or by mail: ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801...Command USTC U.S. Training Center INSPECTOR GENERAL DEPARTMENT OF DEFENSE 400 ARMY NAVY DRIVE ARLINGTON, VIRGINIA 22202- 4704 November 1, 2011...Training Center, Inc. (USTC) (formerly Blackwater Lodge and Training, Inc.). 2 The CNTPO IDIQ contracts allow for three task order types—firm-fixed

  16. 48 CFR 1309.507-2 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1309.507-2... systems for which task orders may be issued and indicate which organizational conflict of interest... order which organizational conflict of interest provision in paragraph (a)(2) of this clause shall apply...

  17. ELECTROMAGNETIC SCATTERING AND ANTENNA TECHNOLOGY (EMSAT) Task Order 0003: Design of a Circularly Polarized, 20 60 GHZ Active Phased Array for Wide Angle Scanning

    DTIC Science & Technology

    2017-08-08

    Another area of the design that needs to be experimentally tested is the SMPS connectors used to attach the two beamforming stages together. In...AFRL-RY-WP-TR-2017-0104 ELECTROMAGNETIC SCATTERING AND ANTENNA TECHNOLOGY (EMSAT) Task Order 0003: Design of a Circularly Polarized, 20-60...Order 0003: Design of a Circularly Polarized, 20-60 GHZ Active Phased Array for Wide Angle Scanning 5a. CONTRACT NUMBER FA8650-14-D-1714-0003 5b

  18. Collaborative Research and Development (CR&D) III Task Order 0090: Image Processing Framework: From Acquisition and Analysis to Archival Storage

    DTIC Science & Technology

    2013-05-01

    contract or a PhD di sse rtation typically are a " proo f- of-concept" code base that can onl y read a single set of inputs and are not designed ...AFRL-RX-WP-TR-2013-0210 COLLABORATIVE RESEARCH AND DEVELOPMENT (CR&D) III Task Order 0090: Image Processing Framework: From...public release; distribution unlimited. See additional restrictions described on inside pages. STINFO COPY AIR FORCE RESEARCH LABORATORY

  19. Structural Technology Evaluation Analysis Program (STEAP). Task Order 0029: Thermal Stability of Fatigue Life-Enhanced Structures

    DTIC Science & Technology

    2012-01-01

    and c, we were able to obtain Figure 21: Intensity and Pressure Temporal Profiles Calculated from Pressure Model 0 20 40 60 80 100 0 2 4 6 8...August 2008 – 31 January 2012 4 . TITLE AND SUBTITLE STRUCTURAL TECHNOLOGY EVALUATION ANALYSIS PROGRAM (STEAP) Task Order 0029: Thermal...Stability of Fatigue Life-Enhanced Structures 5a. CONTRACT NUMBER FA8650-04-D-3446-0029 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62201F 6

  20. Technology Insertion-Engineering Services Process Characterization. Task Order No. 1. Book 2 of 5. Database Documentation Book. OO-ALC MANPRA (C5 Main Landing Gear - WCD’S)

    DTIC Science & Technology

    1989-12-15

    ORDER NO. 1 BOOK 2 OF 5 DATABASE DOCUMENTATION BOOK 00-ALC MANPRA *(C5 MAIN LANDING GEAR- WCD’S) CONTRACT SUMMARY REPORT , 15 DECEMBER 1989 ’.1 - CONTRACT...ORIQ 1 . T A 1~4 M E* X C I" El 1 -:11 E:XCE:EI:IIE:U RE:CORI’ RFiS CvAUiS FOREXE IN REWORK LI[MITS Ill FINAL DESTINATION 22. COOROINATION/INITIATING MCC

  1. 48 CFR 16.500 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... not limit the use of other than competitive procedures authorized by part 6. (c) Nothing in this..., multiple award, or task or delivery order contracts under any other provision of law. Therefore, GSA...

  2. Preliminary Evidence That Excitatory Transcranial Direct Current Stimulation Extends Time to Task Failure of a Sustained, Submaximal Muscular Contraction in Older Adults.

    PubMed

    Oki, Kentaro; Mahato, Niladri K; Nakazawa, Masato; Amano, Shinichi; France, Christopher R; Russ, David W; Clark, Brian C

    2016-08-01

    Decreased cortical excitability has been proposed as a potential mechanism underlying task failure during sustained muscular contractions, and cortical excitability may decrease with old age. We tested the hypothesis that transcranial direct current stimulation, which has been reported to raise cortical excitability, would prolong the time to task failure during a sustained muscular contraction in older adults. Thirteen older adults (68.3±2.0 years; eight women and five men) performed isometric, elbow flexions to failure while receiving sham or anodal transcranial direct current stimulation. Order of stimulation was randomized, and the subjects and investigators were blinded to condition. Time to task failure was measured alongside selected psychological indices of perceived exertion and affect. Anodal transcranial direct current stimulation prolonged mean time to task failure by approximately 15% (16.9±2.2 vs 14.7±1.8 minutes) and slowed the rate of increase in rating of perceived exertion (0.29±0.03 vs 0.31±0.03) relative to the sham condition. These preliminary findings suggest that anodal transcranial direct current stimulation enhances time to task failure of a sustained, submaximal contraction in older adults by potentially increasing cortical excitability and/or influencing the perception of exertion. These results raise the question of whether interventions that acutely increase cortical excitability could enhance physical function and/or exercise-induced adaptations in older adults. © The Author 2016. Published by Oxford University Press on behalf of The Gerontological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  3. Space Station evolution study

    NASA Technical Reports Server (NTRS)

    Evans, David B.

    1993-01-01

    This is the Space Station Freedom (SSF) Evolution Study 1993 Final Report, performed under NASA Contract NAS8-38783, Task Order 5.1. This task examined: (1) the feasibility of launching current National Space Transportation System (NSTS) compatible logistics elements on expendable launch vehicles (ELV's) and the associated modifications, and (2) new, non-NSTS logistics elements for launch on ELV's to augment current SSF logistics capability.

  4. Lake Champlain TMDL Modeling Quality Assurance Project Plan

    EPA Pesticide Factsheets

    This document presents the quality assurance project plan for providing support to US EPA Region 1 in revising the Lake Champlain Total Maximum Daily Load, under Contract Number EP-C-08-004, Task Order 80.

  5. Work management plan for data systems and analysis directorate

    NASA Technical Reports Server (NTRS)

    Nichols, L. R.

    1979-01-01

    A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

  6. Iraq Security Forces Fund: Weak Contract Oversight Allowed Potential Overcharges by AECOM to go Undetected

    DTIC Science & Technology

    2009-10-30

    review of the invoices submitted in support of the GMASS contract. S PE CI AL I NS PECTO R GE NE R AL FO R I RA Q RE CO NST R UC TIO N...Command-Iraq (MNSTC- I ), using the Iraq Security Forces Fund, issued task orders for a program to assist the Iraqi Army in developing a self...its first tier subcontractor. According to contracting and MNSTC- I officials, Anham had the capability to obtain foreign military vehicle parts

  7. Technology Insertion (TI)/Industrial Process Improvement (IP) Task Order Number 18. Contract Summary Report/Quick Fix Plan for OO-ALC (Optical Repair).

    DTIC Science & Technology

    1991-01-30

    states that continual education and training at all levels of the company is the most important element in enabling companies to gain competitive...staked on information known to be inaccurate and educated guesses from the same people who provided much of the original inaccurate information. The second... educated guesses. 7.1.2.6 Implementation Cost/Schedule Refer to Paragraph 7.1.1.6. 7.1-8 TASK ORDER NO. 18 PROCESS CHARACTERIZATION SCHEDULER RECEIVES ITEM

  8. Prior history of FDI muscle contraction: different effect on MEP amplitude and muscle activity.

    PubMed

    Talis, V L; Kazennikov, O V; Castellote, J M; Grishin, A A; Ioffe, M E

    2014-03-01

    Motor evoked potentials (MEPs) in the right first dorsal interosseous (FDI) muscle elicited by transcranial magnetic stimulation of left motor cortex were assessed in ten healthy subjects during maintenance of a fixed FDI contraction level. Subjects maintained an integrated EMG (IEMG) level with visual feedback and reproduced this level by memory afterwards in the following tasks: stationary FDI muscle contraction at the level of 40 ± 5 % of its maximum voluntary contraction (MVC; 40 % task), at the level of 20 ± 5 % MVC (20 % task), and also when 20 % MVC was preceded by either no contraction (0-20 task), by stronger muscle contraction (40-20 task) or by no contraction with a previous strong contraction (40-0-20 task). The results show that the IEMG level was within the prescribed limits when 20 and 40 % stationary tasks were executed with and without visual feedback. In 0-20, 40-20, and 40-0-20 tasks, 20 % IEMG level was precisely controlled in the presence of visual feedback, but without visual feedback the IEMG and force during 20 % IEMG maintenance were significantly higher in the 40-0-20 task than those in 0-20 and 40-20 tasks. That is, without visual feedback, there were significant variations in muscle activity due to different prehistory of contraction. In stationary tasks, MEP amplitudes in 40 % task were higher than in 20 % task. MEPs did not differ significantly during maintenance of the 20 % level in tasks with different prehistory of muscle contraction with and without visual feedback. Thus, in spite of variations in muscle background activity due to different prehistory of contraction MEPs did not vary significantly. This dissociation suggests that the voluntary maintenance of IEMG level is determined not only by cortical mechanisms, as reflected by corticospinal excitability, but also by lower levels of CNS, where afferent signals and influences from other brain structures and spinal cord are convergent.

  9. Inlet Flow Valve Engine Analyses

    NASA Technical Reports Server (NTRS)

    Champagne, G. A.

    2004-01-01

    Pratt&Whitney, under Task Order 13 of the NASA Large Engine Technology (LET) Contract, conducted a study to determine the operating characteristics, performance and weights of Inlet Flow Valve (IFV) propulsion concepts for a Mach 2.4 High Speed Civil Transport (HSCT).

  10. Tank vapor mitigation requirements for Hanford Tank Farms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rakestraw, L.D.

    1994-11-15

    Westinghouse Hanford Company has contracted Los Alamos Technical Associates to listing of vapors and aerosols that are or may be emitted from the High Level Waste (HLW) tanks at Hanford. Mitigation requirements under Federal and State law, as well as DOE Orders, are included in the listing. The lists will be used to support permitting activities relative to tank farm ventilation system up-grades. This task is designated Task 108 under MJB-SWV-312057 and is an extension of efforts begun under Task 53 of Purchase Order MPB-SVV-03291 5 for Mechanical Engineering Support. The results of that task, which covered only thirty-nine tanks,more » are repeated here to provide a single source document for vapor mitigation requirements for all 177 HLW tanks.« less

  11. Multi-Task Project to Provide Research Support for Human Research and Engineering Goals Identified by the Army

    DTIC Science & Technology

    2009-06-01

    Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V

  12. 48 CFR 10.002 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... officer may use market research conducted within 18 months before the award of any task or delivery order... or business publications. (iv) Querying the Governmentwide database of contracts and other procurement instruments intended for use by multiple agencies available at http://www.contractdirectory.gov...

  13. USAID Spent Almost $400 Million on an Afghan Stabilization Project despite Uncertain Results, but Has Taken Steps to Better Assess Similar Efforts

    DTIC Science & Technology

    2012-04-25

    totaling $151 million for a program called Stabilization in Key Areas ( SIKA ). This report assesses (1) the cost and outcomes of the LGCD project and...services to be provided, SIGAR recommends that the Mission Director, USAID/Afghanistan, direct contracting officers to ensure that the SIKA contracts...Provincial Reconstruction Team RFTOP Request for Task Order Proposal SIGAR Special Inspector General for Afghanistan Reconstruction SIKA Stabilization

  14. 77 FR 29129 - Acquisition Process: Task and Delivery Order Contracts, Bundling, Consolidation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... small businesses that already are in the FAR, such as FAR 19.501(c), which states, as a general matter... that particular order. The proposed rule provides several alternatives at Sec. 121.402(c)(i)(A) and (B... shaped it is set forth below. II. Background On September 27, 2010, the President signed into law the...

  15. A Framework for Load Balancing of Tensor Contraction Expressions via Dynamic Task Partitioning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lai, Pai-Wei; Stock, Kevin; Rajbhandari, Samyam

    In this paper, we introduce the Dynamic Load-balanced Tensor Contractions (DLTC), a domain-specific library for efficient task parallel execution of tensor contraction expressions, a class of computation encountered in quantum chemistry and physics. Our framework decomposes each contraction into smaller unit of tasks, represented by an abstraction referred to as iterators. We exploit an extra level of parallelism by having tasks across independent contractions executed concurrently through a dynamic load balancing run- time. We demonstrate the improved performance, scalability, and flexibility for the computation of tensor contraction expressions on parallel computers using examples from coupled cluster methods.

  16. Functional implications of muscle co-contraction during gait in advanced age.

    PubMed

    Lo, Justine; Lo, On-Yee; Olson, Erin A; Habtemariam, Daniel; Iloputaife, Ikechukwu; Gagnon, Margaret M; Manor, Brad; Lipsitz, Lewis A

    2017-03-01

    Older adults often exhibit high levels of lower extremity muscle co-contraction, which may be the cause or effect of age-related impairments in gait and associated falls. Normal gait requires intact executive function and thus can be slowed by challenging executive resources available to the neuromuscular system through the performance of a dual task. We therefore investigated associations between lower limb co-contraction and gait characteristics under normal and dual task conditions in healthy older adults (85.4±5.9years). We hypothesized that greater co-contraction is associated with slower gait speed during dual task conditions that stress executive and attentional abilities. Co-contraction was quantified during different phases of the gait cycle using surface electromyography (EMG) signals obtained from the anterior tibialis and lateral gastrocnemius while walking at preferred speed during normal and dual task conditions. Variables included the time difference to complete the Trail Making Test A and B (ΔTMT) and gait measures during normal or dual task walking. Higher co-contraction levels during the swing phase of both normal and dual task walking were associated with longer ΔTMT (normal: R 2 =0.25, p=0.02; dual task: R 2 =0.27, p=0.01). Co-contraction was associated with gait measures during dual task walking only; greater co-contraction levels during stride and stance were associated with slower gait speed (stride: R 2 =0.38, p=0.04; stance: R 2 =0.38, p=0.04), and greater co-contraction during stride was associated with longer stride time (R 2 =0.16, p=0.03). Our results suggest that relatively high lower limb co-contraction may explain some of the mobility impairments associated with the conduct of executive tasks in older adults. Copyright © 2017 Elsevier B.V. All rights reserved.

  17. Do Differences in Levels, Types, and Duration of Muscle Contraction Have an Effect on the Degree of Post-exercise Depression?

    PubMed

    Miyaguchi, Shota; Kojima, Sho; Kirimoto, Hikari; Tamaki, Hiroyuki; Onishi, Hideaki

    2016-01-01

    We conducted two experiments to determine how differences in muscle contraction levels, muscle contraction types, and movement duration affect degree of post-exercise depression (PED) after non-exhaustive, repetitive finger movement. Twelve healthy participants performed repetitive abduction movements of the right index finger at 2 Hz. In experiment 1, we examined the effects of muscle contraction levels at 10, 20, and 30% maximum voluntary contraction and the effects of muscle contraction types at isotonic and isometric contraction. In experiment 2, we examined the effects of movement duration at 2 and 6 min. Motor-evoked potentials (MEPs) were recorded from the right first dorsal interosseous muscle before movement tasks and 1-10 min after movement tasks. MEP amplitudes after isotonic contraction tasks were significantly smaller than those after isometric contraction tasks and decreased with increasing contraction levels, but were independent of movement duration. This study demonstrated that the degree of PED after non-exhaustive repetitive finger movement depended on muscle contraction levels and types. Thus, the degree of PED may depend on the levels of activity in the motor cortex during a movement task. This knowledge will aid in the design of rehabilitation protocols.

  18. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  19. 48 CFR 801.602-76 - Business clearance review.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Business clearance review... Authority, and Responsibilities 801.602-76 Business clearance review. (a) A business clearance review is a... obtain a business clearance review prior to award of any contract, task or delivery order, or blanket...

  20. 48 CFR 801.602-76 - Business clearance review.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Business clearance review... Authority, and Responsibilities 801.602-76 Business clearance review. (a) A business clearance review is a... obtain a business clearance review prior to award of any contract, task or delivery order, or blanket...

  1. Final Forensic Audit Report of Iraq Reconstruction Funds

    DTIC Science & Technology

    2012-07-13

    and a fine of $15,000. Retired Navy Lieutenant Commander Frankie Hand, and co-defendant Michelle Adams, a U.S. contractor, met in May 2007 at Camp... Blackwater Contract and Task Orders for Worldwide Personal Protective Services in Iraq, AUD/IQO-09-16 and SIGIR 09-021, June 2009. Security Forces

  2. Research on air and missile defense task allocation based on extended contract net protocol

    NASA Astrophysics Data System (ADS)

    Zhang, Yunzhi; Wang, Gang

    2017-10-01

    Based on the background of air and missile defense distributed element corporative engagement, the interception task allocation problem of multiple weapon units with multiple targets under network condition is analyzed. Firstly, a mathematical model of task allocation is established by combat task decomposition. Secondly, the initialization assignment based on auction contract and the adjustment allocation scheme based on swap contract were introduced to the task allocation. Finally, through the simulation calculation of typical situation, the model can be used to solve the task allocation problem in complex combat environment.

  3. Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian

    2000-01-01

    This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

  4. Atomic Oxygen Task

    NASA Technical Reports Server (NTRS)

    Hadaway, James B.

    1997-01-01

    This report details work performed by the Center for Applied Optics (CAO) at the University of Alabama in Huntsville (UAH) on the contract entitled 'Atomic Oxygen Task' for NASA's Marshall Space Flight Center (contract NAS8-38609, Delivery Order 109, modification number 1). Atomic oxygen effects on exposed materials remain a critical concern in designing spacecraft to withstand exposure in the Low Earth Orbit (LEO) environment. The basic objective of atomic oxygen research in NASA's Materials & Processes (M&P) Laboratory is to provide the solutions to material problems facing present and future space missions. The objective of this work was to provide the necessary research for the design of specialized experimental test configurations and development of techniques for evaluating in-situ space environmental effects, including the effects of atomic oxygen and electromagnetic radiation on candidate materials. Specific tasks were performed to address materials issues concerning accelerated environmental testing as well as specifically addressing materials issues of particular concern for LDEF analysis and Space Station materials selection.

  5. Motor unit recruitment and EMG power spectra during ramp contractions of a bifunctional muscle.

    PubMed

    Dupont, L; Gamet, D; Pérot, C

    2000-08-01

    Surface electromyograms (EMGs) were analysed on the short and long head of the biceps brachii (BBSH and BBLH) during single (F and S) or dual (F+S) flexion and supination tasks. It was confirmed, by the analysis of EMG root-mean-square (RMS) values, that the highest activations of BBSH and BBLH were obtained during a maximal dual task. This study was essentially concerned with the analysis of power spectra data obtained during progressive or ramp contractions (RCs). The shape of the power spectra established during the first second of the RCs differs between F, S and F+S tasks. Differences in mean power frequency (MPF) calculated during RCs would be representative of a recruitment of motor units (MUs) that is, at least partly, task-dependent. In order to compare MPF values calculated from RCs performed under different mechanical conditions (F, S and F+S), MPF-RMS(PSD) relationships have been established (RMS(PSD) being defined as the power spectrum density RMS). Both BBSH and BBLH exhibited initial MPF values higher in supination RC than in flexion RC. Because of plateau values reached at the same level of muscle activation whatever the task performed, the slope of the MPF-RMS(PSD) relationship was lower in S than in F. These results are in favour of MU recruitment that is, at least partly, different in F and in S conditions. Dual submaximal tasks seem to mix the activation of the F and S subpopulations of MUs as revealed by the spectral parameters obtained during F+S ramp contractions. This study could find some implication in the field of muscle rehabilitation or reinforcement.

  6. Measurement the thickness of the transverse abdominal muscle in different tasks.

    PubMed

    Pang, Ling; Yin, Liquan; Tajiri, Kimiko; Huo, Ming; Maruyama, Hitoshi

    2017-02-01

    [Purpose] This study examined the measurement of the thickness of the transverse abdominal muscle in different tasks. [Subjects and Methods] The subjects were eleven healthy adult females. Thicknesses of transverse abdominal muscle were measured in seven tasks in the supine position. The tasks were: 1) Resting state, 2) Maximal contraction of transverse abdominal muscle, 3) Maximal contraction of levator ani muscle, 4) Maximal simultaneous contraction of both transverse abdominal muscle and levator ani muscle, 5) Maximal simultaneous contraction of both transverse abdominal muscle and levator ani muscle with front side resistance added to both knee, 6) Maximal simultaneous contraction of both transverse abdominal muscle and levator ani muscle with diagonal resistance added to both knees, and 7) Maximal simultaneous contraction of both transverse abdominal muscle and levator ani muscle with lateral resistance added to both knees. [Results] The thicknesses of transverse abdominal muscle during maximal simultaneous contraction and maximal simultaneous contraction with resistance were greater than during the resting state. [Conclusion] The muscle output during simultaneous contraction and resistance movement were larger than that of each individual muscle.

  7. 77 FR 8166 - Partner Vetting in USAID Acquisitions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... of this nature are outside the scope of the Proposed Rule, we are not addressing them in this Final... Partner vetting in USAID Acquisitions: Source Selection vs. Vetting Comment 1: ``USAID declares that... ``post-award'' nature of task orders, we have added a contract clause at 752.216-70 which includes the...

  8. Noise Measurements of the VAIIPR Fan

    NASA Technical Reports Server (NTRS)

    Mendoza, Jeff; Weir, Don

    2012-01-01

    This final report has been prepared by Honeywell Aerospace, Phoenix, Arizona, a unit of Honeywell International, Inc., documenting work performed during the period September 2004 through November 2005 for the National Aeronautics and Space Administration (NASA) Glenn Research Center, Cleveland, Ohio, under the Revolutionary Aero-Space Engine Research (RASER) Program, Contract No. NAS3- 01136, Task Order 6, Noise Measurements of the VAIIPR Fan. The NASA Task Manager was Dr. Joe Grady, NASA Glenn Research Center, Mail Code 60-6, Cleveland, Ohio 44135. The NASA Contract Officer was Mr. Albert Spence, NASA Glenn Research Center, Mail Code 60-6, Cleveland, Ohio 44135. This report focuses on the evaluation of internal fan noise as generated from various inflow disturbances based on measurements made from a circumferential array of sensors located near the fan and sensors upstream of a serpentine inlet.

  9. UAS Integration in the NAS Project Test Site Kick-off Meeting

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal; Witzberger, Kevin; Hackenberg, Davis L.; Murphy, Jim

    2015-01-01

    This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

  10. Work-In-Progress Peer Consult on EPA's Multimedia Exposure Analysis to Inform a Public Health-Based Value for Lead in Drinking Water

    EPA Science Inventory

    This document is a compilation of responses from four external peer reviewers on EPA's "Multimedia Exposure Analysis to Inform a Public Health-Based Value for Lead in Drinking Water." It was delivered by Versar, Inc. under contract number EP-C-12-045 Task Order 91.

  11. Work-In-Progress Peer Consult on EPA's Multimedia ...

    EPA Pesticide Factsheets

    This document is a compilation of responses from four external peer reviewers on EPA's "Multimedia Exposure Analysis to Inform a Public Health-Based Value for Lead in Drinking Water." It was delivered by Versar, Inc. under contract number EP-C-12-045 Task Order 91. Peer review report compiled, written and delivered by Versar, Inc to EPA.

  12. Experimental knee pain impairs submaximal force steadiness in isometric, eccentric, and concentric muscle actions.

    PubMed

    Rice, David A; McNair, Peter J; Lewis, Gwyn N; Mannion, Jamie

    2015-09-12

    Populations with knee joint damage, including arthritis, have noted impairments in the regulation of submaximal muscle force. It is difficult to determine the exact cause of such impairments given the joint pathology and associated neuromuscular adaptations. Experimental pain models that have been used to isolate the effects of pain on muscle force regulation have shown impaired force steadiness during acute pain. However, few studies have examined force regulation during dynamic contractions, and these findings have been inconsistent. The goal of the current study was to examine the effect of experimental knee joint pain on submaximal quadriceps force regulation during isometric and dynamic contractions. The study involved fifteen healthy participants. Participants were seated in an isokinetic dynamometer. Knee extensor force matching tasks were completed in isometric, eccentric, and concentric muscle contraction conditions. The target force was set to 10 % of maximum for each contraction type. Hypertonic saline was then injected into the infrapatella fat pad to generate acute joint pain. The force matching tasks were repeated during pain and once more 5 min after pain had subsided. Hypertonic saline resulted in knee pain with an average peak pain rating of 5.5 ± 2.1 (0-10 scale) that lasted for 18 ± 4 mins. Force steadiness significantly reduced during pain across all three muscle contraction conditions. There was a trend to increased force matching error during pain but this was not significant. Experimental knee pain leads to impaired quadriceps force steadiness during isometric, eccentric, and concentric contractions, providing further evidence that joint pain directly affects motor performance. Given the established relationship between submaximal muscle force steadiness and function, such an effect may be detrimental to the performance of tasks in daily life. In order to restore motor performance in people with painful arthritic conditions of the knee, it may be important to first manage their pain more effectively.

  13. The Limits of Military Officers’ Duty to Obey Civilian Orders: A Neo-classical Perspective

    DTIC Science & Technology

    2015-07-01

    subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE...Orders: A Neo-classical Perspective 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...73 19a. NAME OF RESPONSIBLE PERSON a . REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98

  14. Enhanced Core Noise Modeling for Turbofan Engines

    NASA Technical Reports Server (NTRS)

    Stone, James R.; Krejsa, Eugene A.; Clark, Bruce J.

    2011-01-01

    This report describes work performed by MTC Technologies (MTCT) for NASA Glenn Research Center (GRC) under Contract NAS3-00178, Task Order No. 15. MTCT previously developed a first-generation empirical model that correlates the core/combustion noise of four GE engines, the CF6, CF34, CFM56, and GE90 for General Electric (GE) under Contract No. 200-1X-14W53048, in support of GRC Contract NAS3-01135. MTCT has demonstrated in earlier noise modeling efforts that the improvement of predictive modeling is greatly enhanced by an iterative approach, so in support of NASA's Quiet Aircraft Technology Project, GRC sponsored this effort to improve the model. Since the noise data available for correlation are total engine noise spectra, it is total engine noise that must be predicted. Since the scope of this effort was not sufficient to explore fan and turbine noise, the most meaningful comparisons must be restricted to frequencies below the blade passage frequency. Below the blade passage frequency and at relatively high power settings jet noise is expected to be the dominant source, and comparisons are shown that demonstrate the accuracy of the jet noise model recently developed by MTCT for NASA under Contract NAS3-00178, Task Order No. 10. At lower power settings the core noise became most apparent, and these data corrected for the contribution of jet noise were then used to establish the characteristics of core noise. There is clearly more than one spectral range where core noise is evident, so the spectral approach developed by von Glahn and Krejsa in 1982 wherein four spectral regions overlap, was used in the GE effort. Further analysis indicates that the two higher frequency components, which are often somewhat masked by turbomachinery noise, can be treated as one component, and it is on that basis that the current model is formulated. The frequency scaling relationships are improved and are now based on combustor and core nozzle geometries. In conjunction with the Task Order No. 10 jet noise model, this core noise model is shown to provide statistical accuracy comparable to the jet noise model for frequencies below blade passage. This model is incorporated in the NASA FOOTPR code and a user s guide is provided.

  15. Systemic Assurance

    DTIC Science & Technology

    2015-07-31

    RT-119: Systemic Assurance Technical Report SERC -2015-TR-019-1 31 July 2015 Principal Investigator: Dr. William Scherlis, Carnegie...Contract No. HQ0034-13-D-0004 Task Order 0019, RT 119 Report No. SERC -2015-TR-019-RT119 July 15, 2015 Report Documentation Page Form...Technology The Systems Engineering Research Center ( SERC ) is a federally funded University Affiliated Research Center managed by Stevens Institute

  16. 40 CFR 35.937-9 - Required solicitation and subagreement provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; (2) The time for performance and completion of the contract work, including where appropriate, dates for completion of significant project tasks; (3) Personnel and facilities necessary to accomplish the... for later tasks or steps at the time of contract execution, the contract should not include the...

  17. TASAR Certification and Operational Approval Requirements - Analyses and Results

    NASA Technical Reports Server (NTRS)

    Koczo, Stefan, Jr.

    2015-01-01

    This report documents the results of research and development work performed by Rockwell Collins in addressing the Task 1 objectives under NASA Contract NNL12AA11C. Under this contract Rockwell Collins provided analytical support to the NASA Langley Research Center (LaRC) in NASA's development of a Traffic Aware Strategic Aircrew Requests (TASAR) flight deck Electronic Flight Bag (EFB) application for technology transition into operational use. The two primary objectives of this contract were for Rockwell Collins and the University of Iowa OPL to 1) perform an implementation assessment of TASAR toward early certification and operational approval of TASAR as an EFB application (Task 1 of this contract), and 2) design, develop and conduct two Human-in-the-Loop (HITL) simulation experiments that evaluate TASAR and the associated Traffic Aware Planner (TAP) software application to determine the situational awareness and workload impacts of TASAR in the flight deck, while also assessing the level of comprehension, usefulness, and usability of the features of TAP (Task 2 of this contract). This report represents the Task 1 summary report. The Task 2 summary report is provided in [0].

  18. Nonlinear and progressive failure aspects of transport composite fuselage damage tolerance

    NASA Technical Reports Server (NTRS)

    Walker, Tom; Ilcewicz, L.; Murphy, Dan; Dopker, Bernhard

    1993-01-01

    The purpose is to provide an end-user's perspective on the state of the art in life prediction and failure analysis by focusing on subsonic transport fuselage issues being addressed in the NASA/Boeing Advanced Technology Composite Aircraft Structure (ATCAS) contract and a related task-order contract. First, some discrepancies between the ATCAS tension-fracture test database and classical prediction methods is discussed, followed by an overview of material modeling work aimed at explaining some of these discrepancies. Finally, analysis efforts associated with a pressure-box test fixture are addressed, as an illustration of modeling complexities required to model and interpret tests.

  19. The Possible Role of TASK Channels in Rank-Ordered Recruitment of Motoneurons in the Dorsolateral Part of the Trigeminal Motor Nucleus.

    PubMed

    Okamoto, Keiko; Emura, Norihito; Sato, Hajime; Fukatsu, Yuki; Saito, Mitsuru; Tanaka, Chie; Morita, Yukako; Nishimura, Kayo; Kuramoto, Eriko; Xu Yin, Dong; Furutani, Kazuharu; Okazawa, Makoto; Kurachi, Yoshihisa; Kaneko, Takeshi; Maeda, Yoshinobu; Yamashiro, Takashi; Takada, Kenji; Toyoda, Hiroki; Kang, Youngnam

    2016-01-01

    Because a rank-ordered recruitment of motor units occurs during isometric contraction of jaw-closing muscles, jaw-closing motoneurons (MNs) may be recruited in a manner dependent on their soma sizes or input resistances (IRs). In the dorsolateral part of the trigeminal motor nucleus (dl-TMN) in rats, MNs abundantly express TWIK (two-pore domain weak inwardly rectifying K channel)-related acid-sensitive-K(+) channel (TASK)-1 and TASK3 channels, which determine the IR and resting membrane potential. Here we examined how TASK channels are involved in IR-dependent activation/recruitment of MNs in the rat dl-TMN by using multiple methods. The real-time PCR study revealed that single large MNs (>35 μm) expressed TASK1 and TASK3 mRNAs more abundantly compared with single small MNs (15-20 μm). The immunohistochemistry revealed that TASK1 and TASK3 channels were complementarily distributed in somata and dendrites of MNs, respectively. The density of TASK1 channels seemed to increase with a decrease in soma diameter while there were inverse relationships between the soma size of MNs and IR, resting membrane potential, or spike threshold. Dual whole-cell recordings obtained from smaller and larger MNs revealed that the recruitment of MNs depends on their IRs in response to repetitive stimulation of the presumed Ia afferents. 8-Bromoguanosine-cGMP decreased IRs in small MNs, while it hardly changed those in large MNs, and subsequently decreased the difference in spike-onset latency between the smaller and larger MNs, causing a synchronous activation of MNs. These results suggest that TASK channels play critical roles in rank-ordered recruitment of MNs in the dl-TMN.

  20. Reliability of near-infrared spectroscopy for measuring biceps brachii oxygenation during sustained and repeated isometric contractions.

    PubMed

    Muthalib, Makii; Millet, Guillaume Y; Quaresima, Valentina; Nosaka, Kazunori

    2010-01-01

    We examine the test-retest reliability of biceps brachii tissue oxygenation index (TOI) parameters measured by near-infrared spectroscopy during a 10-s sustained and a 30-repeated (1-s contraction, 1-s relaxation) isometric contraction task at 30% of maximal voluntary contraction (30% MVC) and maximal (100% MVC) intensities. Eight healthy men (23 to 33 yr) were tested on three sessions separated by 3 h and 24 h, and the within-subject reliability of torque and each TOI parameter were determined by Bland-Altman+/-2 SD limits of agreement plots and coefficient of variation (CV). No significant (P>0.05) differences between the three sessions were found for mean values of torque and TOI parameters during the sustained and repeated tasks at both contraction intensities. All TOI parameters were within+/-2 SD limits of agreement. The CVs for torque integral were similar between the sustained and repeated task at both intensities (4 to 7%); however, the CVs for TOI parameters during the sustained and repeated task were lower for 100% MVC (7 to 11%) than for 30% MVC (22 to 36%). It is concluded that the reliability of the biceps brachii NIRS parameters during both sustained and repeated isometric contraction tasks is acceptable.

  1. Age-related differences in muscle fatigue vary by contraction type: a meta-analysis.

    PubMed

    Avin, Keith G; Law, Laura A Frey

    2011-08-01

    During senescence, despite the loss of strength (force-generating capability) associated with sarcopenia, muscle endurance may improve for isometric contractions. The purpose of this study was to perform a systematic meta-analysis of young versus older adults, considering likely moderators (ie, contraction type, joint, sex, activity level, and task intensity). A 2-stage systematic review identified potential studies from PubMed, CINAHL, PEDro, EBSCOhost: ERIC, EBSCOhost: Sportdiscus, and The Cochrane Library. Studies reporting fatigue tasks (voluntary activation) performed at a relative intensity in both young (18-45 years of age) and old (≥ 55 years of age) adults who were healthy were considered. Sample size, mean and variance outcome data (ie, fatigue index or endurance time), joint, contraction type, task intensity (percentage of maximum), sex, and activity levels were extracted. Effect sizes were (1) computed for all data points; (2) subgrouped by contraction type, sex, joint or muscle group, intensity, or activity level; and (3) further subgrouped between contraction type and the remaining moderators. Out of 3,457 potential studies, 46 publications (with 78 distinct effect size data points) met all inclusion criteria. A lack of available data limited subgroup analyses (ie, sex, intensity, joint), as did a disproportionate spread of data (most intensities ≥ 50% of maximum voluntary contraction). Overall, older adults were able to sustain relative-intensity tasks significantly longer or with less force decay than younger adults (effect size=0.49). However, this age-related difference was present only for sustained and intermittent isometric contractions, whereas this age-related advantage was lost for dynamic tasks. When controlling for contraction type, the additional modifiers played minor roles. Identifying muscle endurance capabilities in the older adult may provide an avenue to improve functional capabilities, despite a clearly established decrement in peak torque.

  2. Cognitive Task Analysis of the HALIFAX-Class Operations Room Officer

    DTIC Science & Technology

    1999-03-10

    Image Cover Sheet CLASSIFICATION SYSTEM NUMBER 510918 UNCLASSIFIED llllllllllllllllllllllllllllllllllllllll TITLE COGNITIVE TASK ANALYSIS OF THE...DATES COVERED 00-00-1999 to 00-00-1999 4. TITLE AND SUBTITLE Cognitive Task Analysis of the HALIFAX-Class Operations Room Officer 5a. CONTRACT...Ontario . ~ -- . ’ c ... - Incorporated Cognitive Task Analysis of the HALIFAX-Class Operations Room Officer: PWGSC Contract No. W7711-7-7404/001/SV

  3. Load type influences motor unit recruitment in biceps brachii during a sustained contraction.

    PubMed

    Baudry, Stéphane; Rudroff, Thorsten; Pierpoint, Lauren A; Enoka, Roger M

    2009-09-01

    Twenty subjects participated in four experiments designed to compare time to task failure and motor-unit recruitment threshold during contractions sustained at 15% of maximum as the elbow flexor muscles either supported an inertial load (position task) or exerted an equivalent constant torque against a rigid restraint (force task). Subcutaneous branched bipolar electrodes were used to record single motor unit activity from the biceps brachii muscle during ramp contractions performed before and at 50 and 90% of the time to failure for the position task during both fatiguing contractions. The time to task failure was briefer for the position task than for the force task (P=0.0002). Thirty and 29 motor units were isolated during the force and position tasks, respectively. The recruitment threshold declined by 48 and 30% (P=0.0001) during the position task for motor units with an initial recruitment threshold below and above the target force, respectively, whereas no significant change in recruitment threshold was observed during the force task. Changes in recruitment threshold were associated with a decrease in the mean discharge rate (-16%), an increase in discharge rate variability (+40%), and a prolongation of the first two interspike intervals (+29 and +13%). These data indicate that there were faster changes in motor unit recruitment and rate coding during the position task than the force task despite a similar net muscle torque during both tasks. Moreover, the results suggest that the differential synaptic input observed during the position task influences most of the motor unit pool.

  4. Basic Electricity/Electronics. Learning Guides.

    ERIC Educational Resources Information Center

    Eggett, A. J.

    This packet consists of 22 student learning guides for high school vocational education students in Illinois. The guides contain tasks for a course in electricity/electronics. Each task guide identifies the task and its purpose and provides a learning contract for the student and teacher to sign. Information on the learning contract consists of a…

  5. Human Factors Process Task Analysis Liquid Oxygen Pump Acceptance Test Procedure for the Advanced Technology Development Center

    NASA Technical Reports Server (NTRS)

    Diorio, Kimberly A.

    2002-01-01

    A process task analysis effort was undertaken by Dynacs Inc. commencing in June 2002 under contract from NASA YA-D6. Funding was provided through NASA's Ames Research Center (ARC), Code M/HQ, and Industrial Engineering and Safety (IES). The John F. Kennedy Space Center (KSC) Engineering Development Contract (EDC) Task Order was 5SMA768. The scope of the effort was to conduct a Human Factors Process Failure Modes and Effects Analysis (HF PFMEA) of a hazardous activity and provide recommendations to eliminate or reduce the effects of errors caused by human factors. The Liquid Oxygen (LOX) Pump Acceptance Test Procedure (ATP) was selected for this analysis. The HF PFMEA table (see appendix A) provides an analysis of six major categories evaluated for this study. These categories include Personnel Certification, Test Procedure Format, Test Procedure Safety Controls, Test Article Data, Instrumentation, and Voice Communication. For each specific requirement listed in appendix A, the following topics were addressed: Requirement, Potential Human Error, Performance-Shaping Factors, Potential Effects of the Error, Barriers and Controls, Risk Priority Numbers, and Recommended Actions. This report summarizes findings and gives recommendations as determined by the data contained in appendix A. It also includes a discussion of technology barriers and challenges to performing task analyses, as well as lessons learned. The HF PFMEA table in appendix A recommends the use of accepted and required safety criteria in order to reduce the risk of human error. The items with the highest risk priority numbers should receive the greatest amount of consideration. Implementation of the recommendations will result in a safer operation for all personnel.

  6. Influence of prolonged unilateral cervical muscle contraction on head repositioning--decreased overshoot after a 5-min static muscle contraction task.

    PubMed

    Malmström, Eva-Maj; Karlberg, Mikael; Holmström, Eva; Fransson, Per-Anders; Hansson, Gert-Ake; Magnusson, Måns

    2010-06-01

    The ability to reproduce a specified head-on-trunk position can be an indirect test of cervical proprioception. This ability is affected in subjects with neck pain, but it is unclear whether and how much pain or continuous muscle contraction factors contribute to this effect. We studied the influence of a static unilateral neck muscle contraction task (5 min of lateral flexion at 30% of maximal voluntary contraction) on head repositioning ability in 20 subjects (10 women, 10 men; mean age 37 years) with healthy necks. Head repositioning ability was tested in the horizontal plane with 30 degrees target and neutral head position tests; head position was recorded by Zebris((R)), an ultrasound-based motion analyser. Head repositioning ability was analysed for accuracy (mean of signed differences between introduced and reproduced positions) and precision (standard deviation of the differences). Accuracy of head repositioning ability increased significantly after the muscle contraction task, as the normal overshoot was reduced. An average overshoot of 7.1 degrees decreased to 4.6 degrees after the muscle contraction task for the 30 degrees target and from 2.2 degrees to 1.4 degrees for neutral head position. The increased accuracy was most pronounced for movements directed towards the activated side. Hence, prolonged unilateral neck muscle contraction may increase the sensitivity of cervical proprioceptors.

  7. Task-dependent activation of distinct fast and slow(er) motor pathways during motor imagery.

    PubMed

    Keller, Martin; Taube, Wolfgang; Lauber, Benedikt

    2018-02-22

    Motor imagery and actual movements share overlapping activation of brain areas but little is known about task-specific activation of distinct motor pathways during mental simulation of movements. For real contractions, it was demonstrated that the slow(er) motor pathways are activated differently in ballistic compared to tonic contractions but it is unknown if this also holds true for imagined contractions. The aim of the present study was to assess the activity of fast and slow(er) motor pathways during mentally simulated movements of ballistic and tonic contractions. H-reflexes were conditioned with transcranial magnetic stimulation at different interstimulus intervals to assess the excitability of fast and slow(er) motor pathways during a) the execution of tonic and ballistic contractions, b) motor imagery of these contraction types, and c) at rest. In contrast to the fast motor pathways, the slow(er) pathways displayed a task-specific activation: for imagined ballistic as well as real ballistic contractions, the activation was reduced compared to rest whereas enhanced activation was found for imagined tonic and real tonic contractions. This study provides evidence that the excitability of fast and slow(er) motor pathways during motor imagery resembles the activation pattern observed during real contractions. The findings indicate that motor imagery results in task- and pathway-specific subliminal activation of distinct subsets of neurons in the primary motor cortex. Copyright © 2018 The Author(s). Published by Elsevier Inc. All rights reserved.

  8. Older men are more fatigable than young when matched for maximal power and knee extension angular velocity is unconstrained.

    PubMed

    Dalton, Brian H; Power, Geoffrey A; Paturel, Justin R; Rice, Charles L

    2015-06-01

    The underlying factors related to the divergent findings of age-related fatigue for dynamic tasks are not well understood. The purpose here was to investigate age-related fatigability and recovery between a repeated constrained (isokinetic) and an unconstrained velocity (isotonic) task, in which participants performed fatiguing contractions at the velocity (isokinetic) or resistance (isotonic) corresponding with maximal power. To compare between tasks, isotonic torque-power relationships were constructed prior to and following both fatiguing tasks and during short-term recovery. Contractile properties were recorded from 9 old (~75 years) and 11 young (~25 years) men during three testing sessions. In the first session, maximal power was assessed, and sessions 2 and 3 involved an isokinetic or an isotonic concentric fatigue task performed until maximal power was reduced by 40 %. Compared with young, the older men performed the same number of contractions to task failure for the isokinetic task (~45 contractions), but 20 % fewer for the isotonic task (p < 0.05). Regardless of age and task, maximal voluntary isometric contraction strength, angular velocity, and power were reduced by ~30, ~13, and ~25 %, respectively, immediately following task failure, and only isometric torque was not recovered fully by 10 min. In conclusion, older men are more fatigable than the young when performing a repetitive maximal dynamic task at a relative resistance (isotonic) but not an absolute velocity (isokinetic), corresponding to maximal power.

  9. Acquisition How to Guide: Planning, Preparing, and Processing Acquisition Packages

    DTIC Science & Technology

    1993-08-01

    of Task Outline. In very simple acquisitions, the project officer or COR, with the advice and counsel of the Contract Specialist, may...three concise sentences , each limited to a single idea. Use simple sentence structure (i.e., subject-verb-complement/object). The natural order of words... in a sentence tells the function of each word. Use a paragraph to state a single idea and elaborate on it. State the

  10. Enterprise Systems Value-Based R&D Portfolio Analytics: Methods, Processes, and Tools

    DTIC Science & Technology

    2014-01-14

    Enterprise Systems Value-Based R&D Portfolio Analytics: Methods, Processes, and Tools Final Technical Report SERC -2014-TR-041-1 January 14...by the U.S. Department of Defense through the Systems Engineering Research Center ( SERC ) under Contract H98230-08-D-0171 (Task Order 0026, RT 51... SERC is a federally funded University Affiliated Research Center managed by Stevens Institute of Technology Any opinions, findings and

  11. Hierarchthis: An Interactive Interface for Identifying Mission-Relevant Components of the Advanced Multi-Mission Operations System

    NASA Technical Reports Server (NTRS)

    Litomisky, Krystof

    2012-01-01

    Even though NASA's space missions are many and varied, there are some tasks that are common to all of them. For example, all spacecraft need to communicate with other entities, and all spacecraft need to know where they are. These tasks use tools and services that can be inherited and reused between missions, reducing systems engineering effort and therefore reducing cost.The Advanced Multi-Mission Operations System, or AMMOS, is a collection of multimission tools and services, whose development and maintenance are funded by NASA. I created HierarchThis, a plugin designed to provide an interactive interface to help customers identify mission-relevant tools and services. HierarchThis automatically creates diagrams of the AMMOS database, and then allows users to show/hide specific details through a graphical interface. Once customers identify tools and services they want for a specific mission, HierarchThis can automatically generate a contract between the Multimission Ground Systems and Services Office, which manages AMMOS, and the customer. The document contains the selected AMMOS components, along with their capabilities and satisfied requirements. HierarchThis reduces the time needed for the process from service selections to having a mission-specific contract from the order of days to the order of minutes.

  12. Darwinian algorithms and the Wason selection task: a factorial analysis of social contract selection task problems.

    PubMed

    Platt, R D; Griggs, R A

    1993-08-01

    In four experiments with 760 subjects, the present study examined Cosmides' Darwinian algorithm theory of reasoning: specifically, its explanation of facilitation on the Wason selection task. The first experiment replicated Cosmides' finding of facilitation for social contract versions of the selection task, using both her multiple-problem format and a single-problem format. Experiment 2 examined performance on Cosmides' three main social contract problems while manipulating the perspective of the subject and the presence and absence of cost-benefit information. The presence of cost-benefit information improved performance in two of the three problems while the perspective manipulation had no effect. In Experiment 3, the cost-benefit effect was replicated; and performance on one of the three problems was enhanced by the presence of explicit negatives on the NOT-P and NOT-Q cards. Experiment 4 examined the role of the deontic term "must" in the facilitation observed for two of the social contract problems. The presence of "must" led to a significant improvement in performance. The results of these experiments are strongly supportive of social contract theory in that cost-benefit information is necessary for substantial facilitation to be observed in Cosmides' problems. These findings also suggest the presence of other cues that can help guide subjects to a deontic social contract interpretation when the social contract nature of the problem is not clear.

  13. Age-Related Differences in Muscle Fatigue Vary by Contraction Type: A Meta-analysis

    PubMed Central

    Avin, Keith G.

    2011-01-01

    Background During senescence, despite the loss of strength (force-generating capability) associated with sarcopenia, muscle endurance may improve for isometric contractions. Purpose The purpose of this study was to perform a systematic meta-analysis of young versus older adults, considering likely moderators (ie, contraction type, joint, sex, activity level, and task intensity). Data Sources A 2-stage systematic review identified potential studies from PubMed, CINAHL, PEDro, EBSCOhost: ERIC, EBSCOhost: Sportdiscus, and The Cochrane Library. Study Selection Studies reporting fatigue tasks (voluntary activation) performed at a relative intensity in both young (18–45 years of age) and old (≥55 years of age) adults who were healthy were considered. Data Extraction Sample size, mean and variance outcome data (ie, fatigue index or endurance time), joint, contraction type, task intensity (percentage of maximum), sex, and activity levels were extracted. Data Synthesis Effect sizes were (1) computed for all data points; (2) subgrouped by contraction type, sex, joint or muscle group, intensity, or activity level; and (3) further subgrouped between contraction type and the remaining moderators. Out of 3,457 potential studies, 46 publications (with 78 distinct effect size data points) met all inclusion criteria. Limitations A lack of available data limited subgroup analyses (ie, sex, intensity, joint), as did a disproportionate spread of data (most intensities ≥50% of maximum voluntary contraction). Conclusions Overall, older adults were able to sustain relative-intensity tasks significantly longer or with less force decay than younger adults (effect size=0.49). However, this age-related difference was present only for sustained and intermittent isometric contractions, whereas this age-related advantage was lost for dynamic tasks. When controlling for contraction type, the additional modifiers played minor roles. Identifying muscle endurance capabilities in the older adult may provide an avenue to improve functional capabilities, despite a clearly established decrement in peak torque. PMID:21616932

  14. Conditional Reasoning in Schizophrenic Patients.

    PubMed

    Kornreich, Charles; Delle-Vigne, Dyna; Brevers, Damien; Tecco, Juan; Campanella, Salvatore; Noël, Xavier; Verbanck, Paul; Ermer, Elsa

    2017-01-01

    Conditional reasoning (if p then q) is used very frequently in everyday situations. Conditional reasoning is impaired in brain-lesion patients, psychopathy, alcoholism, and polydrug dependence. Many neurocognitive deficits have also been described in schizophrenia. We assessed conditional reasoning in 25 patients with schizophrenia, 25 depressive patients, and 25 controls, using the Wason selection task in three different domains: social contracts, precautionary rules, and descriptive rules. Control measures included depression, anxiety, and severity of schizophrenia measures as a Verbal Intelligence Scale. Patients with schizophrenia were significantly impaired on all conditional reasoning tasks compared to depressives and controls. However, the social contract and precautions tasks yielded better results than the descriptive tasks. Differences between groups disappeared for social contract but remained for precautions and descriptive tasks when verbal intelligence was used as a covariate. These results suggest that domain-specific reasoning mechanisms, proposed by evolutionary psychologists, are relatively resilient in the face of brain network disruptions that impair more general reasoning abilities. Nevertheless, patients with schizophrenia could encounter difficulties understanding precaution rules and social contracts in real-life situations resulting in unwise risk-taking and misunderstandings in the social world.

  15. NASA Extends Chandra X-ray Observatory Contract with the Smithsonian Astrophysical Observatory

    NASA Astrophysics Data System (ADS)

    2002-07-01

    NASA NASA has extended its contract with the Smithsonian Astrophysical Observatory in Cambridge, Mass. to August 2003 to provide science and operational support for the Chandra X- ray Observatory, one of the world's most powerful tools to better understand the structure and evolution of the universe. The contract is an 11-month period of performance extension to the Chandra X-ray Center contract, with an estimated value of 50.75 million. Total contract value is now 298.2 million. The contract extension resulted from the delay of the launch of the Chandra X-ray Observatory from August 1998 to July 1999. The revised period of performance will continue the contract through Aug. 31, 2003, which is 48 months beyond operational checkout of the observatory. The contract type is cost reimbursement with no fee. The contract covers mission operations and data analysis, which includes both the observatory operations and the science data processing and general observer (astronomer) support. The observatory operations tasks include monitoring the health and status of the observatory and developing and distributing by satellite the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning, and coordination of science observations with the general observers and the processing and delivery of the resulting scientific data. Each year, there are on the order of 200 to 250 observing proposals selected out of about 800 submitted, with a total amount of observing time about 20 million seconds. X-ray astronomy can only be performed from space because Earth's atmosphere blocks X-rays from reaching the surface. The Chandra Observatory travels one-third of the way to the Moon during its orbit around the Earth every 64 hours. At its highest point, Chandra's highly elliptical, or egg-shaped, orbit is 200 times higher than that of its visible-light- gathering sister, the Hubble Space Telescope. NASA's Marshall Space Flight Center, Huntsville, Ala., manages the Chandra Program for the Office of Space Science in Washington. The development contractor for the spacecraft was TRW, Inc., Redondo Beach, Calif. The Smithsonian's Chandra X-ray Center controls science and flight operations from Cambridge.

  16. 48 CFR 537.201 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., recent performance of work of similar size and scope, specific training and other factors that the contracting officer determines are necessary to the successful performance of the task or contract at issue.... Requisite training and capability means training and capability necessary to successfully perform the task...

  17. Annual Report of the National Science Foundation on Contract NSF-C414 Task III July 1966 through June 1967.

    ERIC Educational Resources Information Center

    American Chemical Society, Columbus, OH. Chemical Abstracts Service.

    This Annual Report describes in detail the work performed during the first year of Task III of Contract NSF-C414 and the present status of Task III work. The programs and achievements described constitute the first significant efforts to develop a user-oriented, cooperative program between major secondary scientific and technical information…

  18. The CINCS (Commanders-in-Chief) and the Acquisition Process

    DTIC Science & Technology

    1988-09-01

    ELEMENT I PROJECT NO. TASK NO. ACCESSION NO. Washington, DC 20301 T -AO-461 WORK UNIT 11. TITLE (Inokde Seoewhly Clasifloetlon) THE CINCS AND THE ACQUISITION...Herschel Kanter Leonard Wainstein Rachel Kaganoff Barry Pavel September 1988 IDA INSTITUTE FOR DEFENSE ANALYSES Contract MDA 903 84 C 0031 Task T -AO-461...3 PREFACE This task was undertaken as part of Task T -AO-461, "Special Studies of Critical Defense Issues," Contract Number MDA 903 84 C 0031. Its

  19. Trainability of Muscular Activity Level during Maximal Voluntary Co-Contraction: Comparison between Bodybuilders and Nonathletes

    PubMed Central

    Maeo, Sumiaki; Takahashi, Takumi; Takai, Yohei; Kanehisa, Hiroaki

    2013-01-01

    Antagonistic muscle pairs cannot be fully activated simultaneously, even with maximal effort, under conditions of voluntary co-contraction, and their muscular activity levels are always below those during agonist contraction with maximal voluntary effort (MVE). Whether the muscular activity level during the task has trainability remains unclear. The present study examined this issue by comparing the muscular activity level during maximal voluntary co-contraction for highly experienced bodybuilders, who frequently perform voluntary co-contraction in their training programs, with that for untrained individuals (nonathletes). The electromyograms (EMGs) of biceps brachii and triceps brachii muscles during maximal voluntary co-contraction of elbow flexors and extensors were recorded in 11 male bodybuilders and 10 nonathletes, and normalized to the values obtained during the MVE of agonist contraction for each of the corresponding muscles (% EMGMVE). The involuntary coactivation level in antagonist muscle during the MVE of agonist contraction was also calculated. In both muscles, % EMGMVE values during the co-contraction task for bodybuilders were significantly higher (P<0.01) than those for nonathletes (biceps brachii: 66±14% in bodybuilders vs. 46±13% in nonathletes, triceps brachii: 74±16% vs. 57±9%). There was a significant positive correlation between a length of bodybuilding experience and muscular activity level during the co-contraction task (r = 0.653, P = 0.03). Involuntary antagonist coactivation level during MVE of agonist contraction was not different between the two groups. The current result indicates that long-term participation in voluntary co-contraction training progressively enhances muscular activity during maximal voluntary co-contraction. PMID:24260233

  20. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2009-04-07

    and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs...statements among others, although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS

  1. Mitigation of Oil in Water Column: Mitigation Prototype Tests

    DTIC Science & Technology

    2017-06-01

    distribution is unlimited. The study was funded in part by the U.S. Department of the Interior, Bureau of Safety and Environmental Enforcement (BSEE) through...James E. Fletcher Environment &Waterways Branch Chief United States Coast Guard Research & Development Center 1 Chelsea Street New London, CT...Research and Development Center 1 Chelsea Street New London, CT 06320 10. Work Unit No. (TRAIS) 11. Contract or Grant No. Task Order #HSCG32-17-J

  2. Increasing the Department of the Navy’s Opportunities for Small Businesses and Non-Traditional Suppliers through Simplified Acquisitions Contracting and NAICS Targeting

    DTIC Science & Technology

    2013-08-01

    Procurement Law & Policy Reviewed by: Released by: William R. Gates, Ph.D., Dean Jeffrey D. Paduan, Ph.D. Graduate School of Business...10 II. REVIEW AND ANALYSIS OF APPLICABLE LAW AND SCHOLARSHIP ..12 A. INTRODUCTION...Indefinite-Delivery task or delivery orders. Section 4004 of the Federal Acquisition Streamlining Act (FASA) of 1994, Public Law 103-355 (1994

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The objective of the contract is to consolidate the advances made during the previous contract in the conversion of syngas to motor fuels using Molecular Sieve-containing catalysts and to demonstrate the practical utility and economic value of the new catalyst/process systems with appropriate laboratory runs. Work on the program is divided into the following six tasks: (1) preparation of a detailed work plan covering the entire performance of the contract; (2) techno-economic studies that will supplement those that are presently being carried out by MITRE; (3) optimization of the most promising catalysts developed under prior contract; (4) optimization of themore » UCC catalyst system in a manner that will give it the longest possible service life; (5) optimization of a UCC process/catalyst system based upon a tubular reactor with a recycle loop containing the most promising catalyst developed under Tasks 3 and 4 studies; and (6) economic evaluation of the optimal performance found under Task 5 for the UCC process/catalyst system. Progress reports are presented for Tasks 1, 3, 4, and 5.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The objective of the contract is to consolidate the advances made during the previous contract in the conversion of syngas to motor fuels using Molecular Sieve-containing catalysts and to demonstrate the practical utility and economic value of the new catalyst/process systems with appropriate laboratory runs. Work on the program is divided into the following six tasks: (1) preparation of a detailed work plan covering the entire performance of the contract; (2) preliminary techno-economic assessment of the UCC catalyst/process system; (3) optimization of the most promising catalyst developed under prior contract; (4) optimization of the UCC catalyst system in a mannermore » that will give it the longest possible service life; (5) optimization of a UCC process/catalyst system based upon a tubular reactor with a recycle loop containing the most promising catalyst developed under Tasks 3 and 4 studies; and (6) economic evaluation of the optimal performance found under Task 5 for the UCC process/catalyst system. Progress reports are presented for tasks 2 through 5. 232 figs., 19 tabs.« less

  5. QUADRICEPS LOW FREQUENCY FATIGUE AND MUSCLE PAIN ARE CONTRACTION TYPE DEPENDENT

    PubMed Central

    Iguchi, Masaki; Shields, Richard K.

    2010-01-01

    Introduction Eccentric contractions are thought to induce greater low frequency fatigue (LFF) and delayed onset muscle soreness (DOMS) than concentric contractions. This study induced a similar amount of eccentric quadriceps muscle fatigue during either a concentric or eccentric fatigue task to compare LFF and DOMS. Methods Subjects (n=22) performed concentric or eccentric fatigue tasks using 75% of the pre-fatigue maximal voluntary contraction (MVC) torque, and both tasks ended when the MVC eccentric torque decreased by 25% pre-fatigue. Results When subjects reached the failure criterion during the eccentric and concentric tasks, the concentric MVC was 78 ± 9.8% and 64 ± 8.4% of initial, respectively. LFF was greater after the concentric than the eccentric protocols (22 ± 12.4% and 15 ± 7.6% increase, respectively; p < 0.01). DOMS was over 100% greater for the eccentric protocol. Discussion These results indicate that DOMS is not dependent on the events that contribute to LFF. PMID:20544933

  6. The Advantages of Normalizing Electromyography to Ballistic Rather than Isometric or Isokinetic Tasks.

    PubMed

    Suydam, Stephen M; Manal, Kurt; Buchanan, Thomas S

    2017-07-01

    Isometric tasks have been a standard for electromyography (EMG) normalization stemming from anatomic and physiologic stability observed during contraction. Ballistic dynamic tasks have the benefit of eliciting maximum EMG signals for normalization, despite having the potential for greater signal variability. It is the purpose of this study to compare maximum voluntary isometric contraction (MVIC) to nonisometric tasks with increasing degrees of extrinsic variability, ie, joint range of motion, velocity, rate of contraction, etc., to determine if the ballistic tasks, which elicit larger peak EMG signals, are more reliable than the constrained MVIC. Fifteen subjects performed MVIC, isokinetic, maximum countermovement jump, and sprint tasks while EMG was collected from 9 muscles in the quadriceps, hamstrings, and lower leg. The results revealed the unconstrained ballistic tasks were more reliable compared to the constrained MVIC and isokinetic tasks for all triceps surae muscles. The EMG from sprinting was more reliable than the constrained cases for both the hamstrings and vasti. The most reliable EMG signals occurred when the body was permitted its natural, unconstrained motion. These results suggest that EMG is best normalized using ballistic tasks to provide the greatest within-subject reliability, which beneficially yield maximum EMG values.

  7. The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

    NASA Astrophysics Data System (ADS)

    Suhaida, S. K.; Wong, Z. D.

    2017-11-01

    Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.

  8. 48 CFR 2452.242-71 - Contract management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., concise summary of technical progress made and the costs incurred for each task during the reporting... technical progress made for each task during the reporting period; and (B) Identifies problems, or potential... and progress reporting as described herein. (b) The contract management system shall consist of two...

  9. fMRI characterisation of widespread brain networks relevant for behavioural variability in fine hand motor control with and without visual feedback.

    PubMed

    Mayhew, Stephen D; Porcaro, Camillo; Tecchio, Franca; Bagshaw, Andrew P

    2017-03-01

    A bilateral visuo-parietal-motor network is responsible for fine control of hand movements. However, the sub-regions which are devoted to maintenance of contraction stability and how these processes fluctuate with trial-quality of task execution and in the presence/absence of visual feedback remains unclear. We addressed this by integrating behavioural and fMRI measurements during right-hand isometric compression of a compliant rubber bulb, at 10% and 30% of maximum voluntary contraction, both with and without visual feedback of the applied force. We quantified single-trial behavioural performance during 1) the whole task period and 2) stable contraction maintenance, and regressed these metrics against the fMRI data to identify the brain activity most relevant to trial-by-trial fluctuations in performance during specific task phases. fMRI-behaviour correlations in a bilateral network of visual, premotor, primary motor, parietal and inferior frontal cortical regions emerged during performance of the entire feedback task, but only in premotor, parietal cortex and thalamus during the stable contraction period. The trials with the best task performance showed increased bilaterality and amplitude of fMRI responses. With feedback, stronger BOLD-behaviour coupling was found during 10% compared to 30% contractions. Only a small subset of regions in this network were weakly correlated with behaviour without feedback, despite wider network activated during this task than in the presence of feedback. These findings reflect a more focused network strongly coupled to behavioural fluctuations when providing visual feedback, whereas without it the task recruited widespread brain activity almost uncoupled from behavioural performance. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.

  10. High levels of time contraction in young children in dual tasks are related to their limited attention capacities.

    PubMed

    Hallez, Quentin; Droit-Volet, Sylvie

    2017-09-01

    Numerous studies have shown that durations are judged shorter in a dual-task condition than in a simple-task condition. The resource-based theory of time perception suggests that this is due to the processing of temporal information, which is a demanding cognitive task that consumes limited attention resources. Our study investigated whether this time contraction in a dual-task condition is greater in younger children and, if so, whether this is specifically related to their limited attention capacities. Children aged 5-7years were given a temporal reproduction task in a simple-task condition and a dual-task condition. In addition, different neuropsychological tests were used to assess not only their attention capacities but also their capacities in terms of working memory and information processing speed. The results showed a shortening of perceived time in the dual task compared with the simple task, and this increased as age decreased. The extent of this shortening effect was directly linked to younger children's limited attentional capacities; the lower their attentional capacities, the greater the time contraction. This study demonstrated that children's errors in time judgments are linked to their cognitive capacities rather than to capacities that are specific to time. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. Small Engine Technology (SET) Task 24 Business and Regional Aircraft System Studies

    NASA Technical Reports Server (NTRS)

    Lieber, Lysbeth

    2003-01-01

    This final report has been prepared by Honeywell Engines & Systems, Phoenix, Arizona, a unit of Honeywell International Inc., documenting work performed during the period June 1999 through December 1999 for the National Aeronautics and Space Administration (NASA) Glenn Research Center, Cleveland, Ohio, under the Small Engine Technology (SET) Program, Contract No. NAS3-27483, Task Order 24, Business and Regional Aircraft System Studies. The work performed under SET Task 24 consisted of evaluating the noise reduction benefits compared to the baseline noise levels of representative 1992 technology aircraft, obtained by applying different combinations of noise reduction technologies to five business and regional aircraft configurations. This report focuses on the selection of the aircraft configurations and noise reduction technologies, the prediction of noise levels for those aircraft, and the comparison of the noise levels with those of the baseline aircraft.

  12. Effect of muscle relaxation in the foot on simultaneous muscle contraction in the contralateral hand.

    PubMed

    Kato, Kouki; Kanosue, Kazuyuki

    2016-10-28

    We investigated the effects of foot muscle relaxation and contraction on muscle activities in the hand on both ipsilateral and contralateral sides. The subjects sat in an armchair with hands in the pronated position. They were able to freely move their right/left hand and foot. They performed three tasks for both ipsilateral (right hand and right foot) and contralateral limb coordination (left hand and right foot for a total of six tasks). These tasks involved: (1) wrist extension from a flexed (resting) position, (2) wrist extension with simultaneous ankle dorsiflexion from a plantarflexed (resting) position, and (3) wrist extension with simultaneous ankle relaxation from a dorsiflexed position. The subjects performed each task as fast as possible after hearing the start signal. Reaction time for the wrist extensor contraction (i.e. the degree to which it preceded the motor reaction time), as observed in electromyography (EMG), became longer when it was concurrently done with relaxation of the ankle dorsiflexor. Also, the magnitude of EMG activity became smaller, as compared with activity when wrist extensor contraction was done alone or with contraction of the ankle dorsiflexor. These effects were observed not only for the ipsilateral hand, but also for the contralateral hand. Our findings suggest that muscle relaxation in one limb interferes with muscle contraction in both the ipsilateral and contralateral limbs. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  13. Adjustments differ among low-threshold motor units during intermittent, isometric contractions.

    PubMed

    Farina, Dario; Holobar, Ales; Gazzoni, Marco; Zazula, Damjan; Merletti, Roberto; Enoka, Roger M

    2009-01-01

    We investigated the changes in muscle fiber conduction velocity, recruitment and derecruitment thresholds, and discharge rate of low-threshold motor units during a series of ramp contractions. The aim was to compare the adjustments in motor unit activity relative to the duration that each motor unit was active during the task. Multichannel surface electromyographic (EMG) signals were recorded from the abductor pollicis brevis muscle of eight healthy men during 12-s contractions (n = 25) in which the force increased and decreased linearly from 0 to 10% of the maximum. The maximal force exhibited a modest decline (8.5 +/- 9.3%; P < 0.05) at the end of the task. The discharge times of 73 motor units that were active for 16-98% of the time during the first five contractions were identified throughout the task by decomposition of the EMG signals. Action potential conduction velocity decreased during the task by a greater amount for motor units that were initially active for >70% of the time compared with that of less active motor units. Moreover, recruitment and derecruitment thresholds increased for these most active motor units, whereas the thresholds decreased for the less active motor units. Another 18 motor units were recruited at an average of 171 +/- 32 s after the beginning of the task. The recruitment and derecruitment thresholds of these units decreased during the task, but muscle fiber conduction velocity did not change. These results indicate that low-threshold motor units exhibit individual adjustments in muscle fiber conduction velocity and motor neuron activation that depended on the relative duration of activity during intermittent contractions.

  14. Improved Oversight, but No Invoice Reviews and Potential Antideficiency Act Violation May Have Occurred on the Kuwait Observer Controller Team Task Orders

    DTIC Science & Technology

    2012-08-02

    Contracting, Program Executive Office for Simulation, Training, and Instrumentation; the Resident Auditor, Raytheon Network Centric Systems, Defense...Router Network (SIPRNET). We appreciate the courtesies extended to the staff. Please direct questions to Mr. Tim Moore at (703) 604-9068 (DSN 664...Raytheon Network Centric System Resident Office, DCAA, should develop and implement procedures to verify that the Army does not reimburse the contractor

  15. Combat Service Support Model Development: BRASS - TRANSLOG - Army 21

    DTIC Science & Technology

    1984-07-01

    throughout’the system. Transitional problems may address specific hardware and related software , such as the Standard Army Ammunition System ( SAAS ...FILE. 00 Cabat Service Support Model Development .,PASS TRANSLOG -- ARMY 21 0 Contract Number DAAK11-84-D-0004 Task Order #1 DRAFT REPOkT July 1984 D...Armament Systems, Inc. 211 West Bel Air Avenue P.O. Box 158 Aberdeen, MD 21001 8 8 8 2 1 S CORMIT SERVICE SUPPORT MODEL DEVELOPMENT BRASS -- TRANSLOG

  16. Maritime Security: Potential Terrorist Attacks and Protection Priorities

    DTIC Science & Technology

    2007-01-09

    Liquefied Natural Gas: Siting and Safety .” Feb. 15, 2005. 108 U.S. Coast Guard. U.S. Coast Guard Captain of the Port Long Island Sound Waterways...Order Code RL33787 Maritime Security: Potential Terrorist Attacks and Protection Priorities January 9, 2007 Paul W. Parfomak and John Frittelli...Terrorist Attacks and Protection Priorities 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK

  17. Reperfusion response changes induced by repeated, sustained contractions in normal human masseter muscle.

    PubMed

    Aizawa, Shigeru; Tsukiyama, Yoshihiro; Koyano, Kiyoshi; Clark, Glenn T

    2002-07-01

    The purpose was to evaluate the intramuscular reperfusion response characteristics associated with repeated isometric contractions in normal human masseter. Intramuscular blood volume was quantified with a near-infrared spectroscopic device that measured the total haemoglobin (Hb) concentration in the muscle. Electromyographic (EMG) activity from the masseter and total bite forces were also recorded. Sixteen healthy volunteers, eight females and eight males, without masticatory muscle pain participated. They were asked first to clench their teeth for as long as possible at 50% of their maximum voluntary contraction (MVC). This was followed by a 60s rest and then immediately by a standard clenching task (50% MVC for 30s) and a 60s recovery period, immediately after which they were asked to repeat exactly the same procedure, with a final 5 min recovery period after the second 30s contraction. Bite force, EMG and Hb concentration were measured continuously and the duration of the two endurance tasks and the amplitudes of all recorded signals were compared (first trial versus second trial). Specifically, the difference between the lowest Hb (trough) seen during the standardised 30s contractions and the highest (peak) seen just after them was assessed. The trough-to-peak difference in Hb concentration of the second standard contraction task was significantly smaller than that of the first standard task (P<0.05, paired t-test). These data show that with sustained effort the post-contraction vasodilatory reperfusion responses of the human masseter are diminished, suggesting a progressive desensitisation of the vasodilatory system.

  18. Detecting cheaters without thinking: testing the automaticity of the cheater detection module.

    PubMed

    Van Lier, Jens; Revlin, Russell; De Neys, Wim

    2013-01-01

    Evolutionary psychologists have suggested that our brain is composed of evolved mechanisms. One extensively studied mechanism is the cheater detection module. This module would make people very good at detecting cheaters in a social exchange. A vast amount of research has illustrated performance facilitation on social contract selection tasks. This facilitation is attributed to the alleged automatic and isolated operation of the module (i.e., independent of general cognitive capacity). This study, using the selection task, tested the critical automaticity assumption in three experiments. Experiments 1 and 2 established that performance on social contract versions did not depend on cognitive capacity or age. Experiment 3 showed that experimentally burdening cognitive resources with a secondary task had no impact on performance on the social contract version. However, in all experiments, performance on a non-social contract version did depend on available cognitive capacity. Overall, findings validate the automatic and effortless nature of social exchange reasoning.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The objective of the contract is to consolidate the advances made during the previous contract in the conversion of syngas to motor fuels using Molecular Sieve-containing catalysts and to demonstrate the practical utility and economic value of the new catalyst/process systems with appropriate laboratory runs. Work on the program is divided into the following six tasks: (1) preparation of a detailed work plan covering the entire performance of the contract; (2) preliminary techno-economic assessment of the UCC catalyst/process system; (3) optimization of the most promising catalysts developed under prior contract; (4) optimization of the UCC catalyst system in a mannermore » that will give it the longest possible service life; (5) optimization of a UCC process/catalyst system based upon a tubular reactor with a recycle loop; and (6) economic evaluation of the optimal performance found under Task 5 for the UCC process/catalyst system. Accomplishments are reported for Tasks 2 through 5.« less

  20. Contracting AFSC 651X0, AFPT 90-651-862

    DTIC Science & Technology

    1991-10-01

    CONTRACTING 78 TABLE 30 TECHNICAL TASKS NOT REFERENCED TO STS HIGH IN TRAINING EMPHASIS (TE) RATINGS TE TASKS RATING N1000 PREPARE DD FORMS 1784 5.08 M739 ...requirements with contractors or customers 89 M739 Compare contractor invoices with QAE reports 89 M731 Analyze adequacy of corrective actions to quality

  1. Control of force during rapid visuomotor force-matching tasks can be described by discrete time PID control algorithms.

    PubMed

    Dideriksen, Jakob Lund; Feeney, Daniel F; Almuklass, Awad M; Enoka, Roger M

    2017-08-01

    Force trajectories during isometric force-matching tasks involving isometric contractions vary substantially across individuals. In this study, we investigated if this variability can be explained by discrete time proportional, integral, derivative (PID) control algorithms with varying model parameters. To this end, we analyzed the pinch force trajectories of 24 subjects performing two rapid force-matching tasks with visual feedback. Both tasks involved isometric contractions to a target force of 10% maximal voluntary contraction. One task involved a single action (pinch) and the other required a double action (concurrent pinch and wrist extension). 50,000 force trajectories were simulated with a computational neuromuscular model whose input was determined by a PID controller with different PID gains and frequencies at which the controller adjusted muscle commands. The goal was to find the best match between each experimental force trajectory and all simulated trajectories. It was possible to identify one realization of the PID controller that matched the experimental force produced during each task for most subjects (average index of similarity: 0.87 ± 0.12; 1 = perfect similarity). The similarities for both tasks were significantly greater than that would be expected by chance (single action: p = 0.01; double action: p = 0.04). Furthermore, the identified control frequencies in the simulated PID controller with the greatest similarities decreased as task difficulty increased (single action: 4.0 ± 1.8 Hz; double action: 3.1 ± 1.3 Hz). Overall, the results indicate that discrete time PID controllers are realistic models for the neural control of force in rapid force-matching tasks involving isometric contractions.

  2. Reassessment of Non-Monosynaptic Excitation from the Motor Cortex to Motoneurons in Single Motor Units of the Human Biceps Brachii

    PubMed Central

    Nakajima, Tsuyoshi; Tazoe, Toshiki; Sakamoto, Masanori; Endoh, Takashi; Shibuya, Satoshi; Elias, Leonardo A.; Mezzarane, Rinaldo A.; Komiyama, Tomoyoshi; Ohki, Yukari

    2017-01-01

    Corticospinal excitation is mediated by polysynaptic pathways in several vertebrates, including dexterous monkeys. However, indirect non-monosynaptic excitation has not been clearly observed following transcranial electrical stimulation (TES) or cervicomedullary stimulation (CMS) in humans. The present study evaluated indirect motor pathways in normal human subjects by recording the activities of single motor units (MUs) in the biceps brachii (BB) muscle. The pyramidal tract was stimulated with weak TES, CMS, and transcranial magnetic stimulation (TMS) contralateral to the recording side. During tasks involving weak co-contraction of the BB and hand muscles, all stimulation methods activated MUs with short latencies. Peristimulus time histograms (PSTHs) showed that responses with similar durations were induced by TES (1.9 ± 1.4 ms) and CMS (2.0 ± 1.4 ms), and these responses often showed multiple peaks with the PSTH peak having a long duration (65.3% and 44.9%, respectively). Such long-duration excitatory responses with multiple peaks were rarely observed in the finger muscles following TES or in the BB following stimulation of the Ia fibers. The responses obtained with TES were compared in the same 14 BB MUs during the co-contraction and isolated BB contraction tasks. Eleven and three units, respectively, exhibited activation with multiple peaks during the two tasks. In order to determine the dispersion effects on the axon conduction velocities (CVs) and synaptic noise, a simulation study that was comparable to the TES experiments was performed with a biologically plausible neuromuscular model. When the model included the monosynaptic-pyramidal tract, multiple peaks were obtained in about 34.5% of the motoneurons (MNs). The experimental and simulation results indicated the existence of task-dependent disparate inputs from the pyramidal tract to the MNs of the upper limb. These results suggested that intercalated interneurons are present in the spinal cord and that these interneurons might be equivalent to those identified in animal experiments. PMID:28194103

  3. Headquarters Task Group 8.5 Operation Plan 2-1-62 Operation Order 2-1-62, Effective ____1962 for Operation Dominic

    DTIC Science & Technology

    1962-03-22

    1-62 Operation Order 2-1-62, Effective ____1962 for Operation Dominic 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S...q TG-8.5, 15 Jan 62 co Camand Program Schedule, Eq JTF-8, 17 Jan 62 d. m, Mractor IMA to Wartagcr AID, f i l e referr82 HA-DA-DBA Qtcd l 8 Dec...Establishing the basic secur i ty program of TG 8.5. (c) Developing and dirreminating secur i ty measure8 for action by !CG 8.5 elements. (d) Providing c

  4. Does Cervical Muscular Contraction Affect the Measurement for Electroglottographic Perturbation Parameters?

    PubMed

    Hosokawa, Kiyohito; Ogawa, Makoto; Iwahashi, Toshihiko; Hashimoto, Michiko; Inohara, Hidenori

    2015-11-01

    The purpose was to assess whether cervical muscular contraction during phonation influences the period and amplitude perturbation quotients (PPQ and APQ, respectively) of electroglottographic (EGG) signals, and whether high-pass filtering can attenuate these effects. Prospective. We included 19 nondysphonic speakers and 21 patients with muscle tension dysphonia. During the recording of acoustic and EGG signals, each participant was instructed to naturally phonate sustained vowels /i:/ and /a:/ (NP tasks), and additionally, each nondysphonic participant was asked to phonate the same vowels in a nondysphonic voice quality while contracting the cervical muscles (muscular contracted phonation [MCP] tasks). To confirm the contraction, surface and needle electromyography (EMG) was performed. The EGG signals were high-pass filtered at different cutoff frequencies from 0 to 90 Hz and were subsequently analyzed for the PPQ and APQ. Compared with the NP tasks, the MCP tasks enhanced the cervical EMG activities ranging from 0 to more than 1000 Hz, but conferred only low-frequency noise to the EGG signals under 50 Hz and increased the values for EGG-APQ, but not EGG-PPQ. These EGG-APQ values exhibited gradual decreases after high-pass filtering with an increase in the cutoff frequency ranging from 0 to 50 Hz in both groups, followed by plateaus during the MCP tasks in the nondysphonic group. The present results demonstrate that cervical muscular contraction seriously affects the EGG-APQ values for unfiltered EGG signals independent of the EMG activities and that appropriate high-pass filtering over 50 Hz can attenuate these effects. Copyright © 2015 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  5. 48 CFR 2452.209-71 - Limitation on future contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... give rise to potential organizational conflicts of interest as defined at FAR subpart 9.5. (b) The... contractor, under the terms of this contract or through the performance of tasks pursuant to this contract...

  6. Pain judgements of patients' relatives: examining the use of social contract theory as theoretical framework.

    PubMed

    Kappesser, Judith; de C Williams, Amanda C

    2008-08-01

    Observer underestimation of others' pain was studied using a concept from evolutionary psychology: a cheater detection mechanism from social contract theory, applied to relatives and friends of chronic pain patients. 127 participants estimated characters' pain intensity and fairness of behaviour after reading four vignettes describing characters suffering from pain. Four cues were systematically varied: the character continuing or stopping liked tasks; continuing or stopping disliked tasks; availability of medical evidence; and pain intensity as rated by characters. Results revealed that pain intensity and the two behavioural variables had an effect on pain estimates: high pain self-reports and stopping all tasks led to high pain estimates; pain was estimated to be lowest when characters stopped disliked but continued with liked tasks. This combination was also rated least fair. Results support the use of social contract theory as a theoretical framework to explore pain judgements.

  7. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2010-10-15

    Issues, And Options For Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...19 has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs. In...although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the

  8. DOD Hotline Allegations on Army Use of A Computer Contract

    DTIC Science & Technology

    1993-10-29

    Army, the Navy, and the Defense Logistics Agency central order processing offices and reviewed delivery orders issued on the EDS contract. A...o The contracting officers used the EDS contract line item number and the description when completing a delivery order. o The central order ... processing offices used an automated data base system to match contract line item numbers from the delivery orders to the EDS contract. o EDS verified that

  9. Space transportation nodes assumptions and requirements: Lunar base systems study task 2.1

    NASA Technical Reports Server (NTRS)

    Kahn, Taher Ali; Simonds, Charles H.; Stump, William R.

    1988-01-01

    The Space Transportation Nodes Assumptions and Requirements task was performed as part of the Advanced Space Transportation Support Contract, a NASA Johnson Space Center (JSC) study intended to provide planning for a Lunar Base near the year 2000. The original task statement has been revised to satisfy the following queries: (1) What vehicles are to be processed at the transportation node; (2) What is the flow of activities involved in a vehicle passing through the node; and (3) What node support resources are necessary to support a lunar scenario traffic model composed of a mix of vehicles in an active flight schedule. The Lunar Base Systems Study is concentrating on the initial years of the Phase 2 Lunar Base Scenario. The study will develop the first five years of that phase in order to define the transportation and surface systems (including mass, volumes, power requirements, and designs).

  10. Small Engine Technology (SET) - Task 13 ANOPP Noise Prediction for Small Engines: Jet Noise Prediction Module, Wing Shielding Module, and System Studies Results

    NASA Technical Reports Server (NTRS)

    Lieber, Lysbeth; Golub, Robert (Technical Monitor)

    2000-01-01

    This Final Report has been prepared by AlliedSignal Engines and Systems, Phoenix, Arizona, documenting work performed during the period May 1997 through June 1999, under the Small Engines Technology Program, Contract No. NAS3-27483, Task Order 13, ANOPP Noise Prediction for Small Engines. The report specifically covers the work performed under Subtasks 4, 5 and 6. Subtask 4 describes the application of a semi-empirical procedure for jet noise prediction, subtask 5 describes the development of a procedure to predict the effects of wing shielding, and subtask 6 describes the results of system studies of the benefits of the new noise technology on business and regional aircraft.

  11. Development and Applications of a Self-Contained, Non-Invasive EVA Joint Angle and Muscle Fatigue Sensor System

    NASA Technical Reports Server (NTRS)

    Ranniger, C. U.; Sorenson, E. A.; Akin, D. L.

    1995-01-01

    The University of Maryland Space Systems Laboratory, as a participant in NASA's INSTEP program, is developing a non-invasive, self-contained sensor system which can provide quantitative measurements of joint angles and muscle fatigue in the hand and forearm. The goal of this project is to develop a system with which hand/forearm motion and fatigue metrics can be determined in various terrestrial and zero-G work environments. A preliminary study of the prototype sensor systems and data reduction techniques for the fatigue measurement system are presented. The sensor systems evaluated include fiberoptics, used to measure joint angle, surface electrodes, which measure the electrical signals created in muscle as it contracts; microphones, which measure the noise made by contracting muscle; and accelerometers, which measure the lateral muscle acceleration during contraction. The prototype sensor systems were used to monitor joint motion of the metacarpophalangeal joint and muscle fatigue in flexor digitorum superficialis and flexor carpi ulnaris in subjects performing gripping tasks. Subjects were asked to sustain a 60-second constant-contraction (isometric) exercise and subsequently to perform a repetitive handgripping task to failure. Comparison of the electrical and mechanical signals of the muscles during the different tasks will be used to evaluate the applicability of muscle signal measurement techniques developed for isometric contraction tasks to fatigue prediction in quasi-dynamic exercises. Potential data reduction schemes are presented.

  12. Sex Differences in Human Fatigability: Mechanisms and Insight to Physiological Responses

    PubMed Central

    Hunter, Sandra K.

    2014-01-01

    Sex-related differences in physiology and anatomy are responsible for profound differences in neuromuscular performance and fatigability between men and women. Women are usually less fatigable than men for similar intensity isometric fatiguing contractions. This sex difference in fatigability, however, is task specific because different neuromuscular sites will be stressed when the requirements of the task are altered, and the stress on these sites can differ for men and women. Task variables that can alter the sex difference in fatigue include the type, intensity and speed of contraction, the muscle group assessed, and the environmental conditions. Physiological mechanisms that are responsible for sex-based differences in fatigability may include activation of the motor neuron pool from cortical and subcortical regions, synaptic inputs to the motor neuron pool via activation of metabolically-sensitive small afferent fibres in the muscle, muscle perfusion, and skeletal muscle metabolism and fibre type properties. Non-physiological factors such as the sex bias of studying more males than females in human and animal experiments can also mask a true understanding of the magnitude and mechanisms of sex-based differences in physiology and fatigability. Despite recent developments, there is a tremendous lack of understanding of sex differences in neuromuscular function and fatigability, the prevailing mechanisms and the functional consequences. This review emphasises the need to understand sex-based differences in fatigability in order to shed light on the benefits and limitations that fatigability can exert for men and women during daily tasks, exercise performance, training and rehabilitation in both health and disease. PMID:24433272

  13. Detecting Cheaters without Thinking: Testing the Automaticity of the Cheater Detection Module

    PubMed Central

    Van Lier, Jens; Revlin, Russell; De Neys, Wim

    2013-01-01

    Evolutionary psychologists have suggested that our brain is composed of evolved mechanisms. One extensively studied mechanism is the cheater detection module. This module would make people very good at detecting cheaters in a social exchange. A vast amount of research has illustrated performance facilitation on social contract selection tasks. This facilitation is attributed to the alleged automatic and isolated operation of the module (i.e., independent of general cognitive capacity). This study, using the selection task, tested the critical automaticity assumption in three experiments. Experiments 1 and 2 established that performance on social contract versions did not depend on cognitive capacity or age. Experiment 3 showed that experimentally burdening cognitive resources with a secondary task had no impact on performance on the social contract version. However, in all experiments, performance on a non-social contract version did depend on available cognitive capacity. Overall, findings validate the automatic and effortless nature of social exchange reasoning. PMID:23342012

  14. The Value of Competitive Contracting

    DTIC Science & Technology

    2014-09-01

    Research & Engineering) BBP Better Buying Power BOA basic ordering agreement BPA basic purchase agreement CAE Component Acquisition Executive CDSA...competitive procedures for the following contract actions:” a. Contract and purchase orders b. Orders and calls under part 13 Basic Purchase Agreement ( BPA ...Basic Ordering Agreement (BOA) c. Government wide acquisition contracts and IDIQ contracts d. BPAs and BPA calls under Federal Supply Schedules

  15. Task- and time-dependent modulation of Ia presynaptic inhibition during fatiguing contractions performed by humans

    PubMed Central

    Maerz, Adam H.; Gould, Jeffrey R.; Enoka, Roger M.

    2011-01-01

    Presynaptic modulation of Ia afferents converging onto the motor neuron pool of the extensor carpi radialis (ECR) was compared during contractions (20% of maximal force) sustained to failure as subjects controlled either the angular position of the wrist while supporting an inertial load (position task) or exerted an equivalent force against a rigid restraint (force task). Test Hoffmann (H) reflexes were evoked in the ECR by stimulating the radial nerve above the elbow. Conditioned H reflexes were obtained by stimulating either the median nerve above the elbow or at the wrist (palmar branch) to assess presynaptic inhibition of homonymous (D1 inhibition) and heteronymous Ia afferents (heteronymous Ia facilitation), respectively. The position task was briefer than the force task (P = 0.001), although the maximal voluntary force and electromyograph for ECR declined similarly at failure for both tasks. Changes in the amplitude of the conditioned H reflex were positively correlated between the two conditioning methods (P = 0.02) and differed between the two tasks (P < 0.05). The amplitude of the conditioned H reflex during the position task first increased (129 ± 20.5% of the initial value, P < 0.001) before returning to its initial value (P = 0.22), whereas it increased progressively during the force task to reach 122 ± 17.4% of the initial value at failure (P < 0.001). Moreover, changes in conditioned H reflexes were associated with the time to task failure and force fluctuations. The results suggest a task- and time-dependent modulation of presynaptic inhibition of Ia afferents during fatiguing contractions. PMID:21543747

  16. Behavior of motor units in human biceps brachii during a submaximal fatiguing contraction.

    PubMed

    Garland, S J; Enoka, R M; Serrano, L P; Robinson, G A

    1994-06-01

    The activity of 50 single motor units was recorded in the biceps brachii muscle of human subjects while they performed submaximal isometric elbow flexion contractions that were sustained to induce fatigue. The purposes of this study were to examine the influence of fatigue on motor unit threshold force and to determine the relationship between the threshold force of recruitment and the initial interimpulse interval on the discharge rates of single motor units during a fatiguing contraction. The discharge rate of most motor units that were active from the beginning of the contraction declined during the fatiguing contraction, whereas the discharge rates of most newly recruited units were either constant or increased slightly. The absolute threshold forces of recruitment and derecruitment decreased, and the variability of interimpulse intervals increased after the fatigue task. The change in motor unit discharge rate during the fatigue task was related to the initial rate, but the direction of the change in discharge rate could not be predicted from the threshold force of recruitment or the variability in the interimpulse intervals. The discharge rate of most motor units declined despite an increase in the excitatory drive to the motoneuron pool during the fatigue task.

  17. 48 CFR 217.174 - Multiyear contracts that employ economic order quantity procurement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... employ economic order quantity procurement. 217.174 Section 217.174 Federal Acquisition Regulations... TYPES SPECIAL CONTRACTING METHODS Mulityear Contracting 217.174 Multiyear contracts that employ economic... defense committees at least 30 days before awarding— (1) A multiyear contract providing for economic order...

  18. Motor Variability during Sustained Contractions Increases with Cognitive Demand in Older Adults

    PubMed Central

    Vanden Noven, Marnie L.; Pereira, Hugo M.; Yoon, Tejin; Stevens, Alyssa A.; Nielson, Kristy A.; Hunter, Sandra K.

    2014-01-01

    To expose cortical involvement in age-related changes in motor performance, we compared steadiness (force fluctuations) and fatigability of submaximal isometric contractions with the ankle dorsiflexor muscles in older and young adults and with varying levels of cognitive demand imposed. Sixteen young (20.4 ± 2.1 year: 8 men, 9 women) and 17 older adults (68.8 ± 4.4 years: 9 men, 8 women) attended three sessions and performed a 40 s isometric contraction at 5% maximal voluntary contraction (MVC) force followed by an isometric contraction at 30% MVC until task failure. The cognitive demand required during the submaximal contractions in each session differed as follows: (1) high-cognitive demand session where difficult mental math was imposed (counting backward by 13 from a 4-digit number); (2) low-cognitive demand session which involved simple mental math (counting backward by 1); and (3) control session with no mental math. Anxiety was elevated during the high-cognitive demand session compared with other sessions for both age groups but more so for the older adults than young adults (p  < 0.05). Older adults had larger force fluctuations than young adults during: (1) the 5% MVC task as cognitive demand increased (p  = 0.007), and (2) the fatiguing contraction for all sessions (p  = 0.002). Time to task failure did not differ between sessions or age groups (p  > 0.05), but the variability between sessions (standard deviation of three sessions) was greater for older adults than young (2.02 ± 1.05 vs. 1.25 ± 0.51 min, p  < 0.05). Thus, variability in lower limb motor performance for low- and moderate-force isometric tasks increased with age and was exacerbated when cognitive demand was imposed, and may be related to modulation of synergist and antagonist muscles and an altered neural strategy with age originating from central sources. These data have significant implications for cognitively demanding low-force motor tasks that are relevant to functional and ergonomic in an aging workforce. PMID:24904410

  19. Bridge-in-a-Backpack(TM) task 5: guidelines for quality assurance.

    DOT National Transportation Integrated Search

    2016-03-01

    This report includes fulfillment of Task 5 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 6 provides guidelines for quality assurance. : The Bridge-in-a-Backpack or hybrid composite arch ...

  20. Motor training reduces surround inhibition in the motor cortex.

    PubMed

    Akkad, Haya; Di Stasio, Flavio; Tibold, Robert; Kassavetis, Panagiotis; Rothwell, John C; Edwards, Mark J

    2016-06-01

    Surround inhibition (SI) is thought to facilitate focal contraction of a hand muscle by keeping nearby muscles silent. Unexpectedly, SI is reduced in skilled pianists. We tested whether repeated practice of focal contraction in non-pianists could reduce SI. Motor-evoked potentials were elicited by transcranial magnetic stimulation in the relaxed abductor digiti minimi randomly at the onset and 5s after offset of a 2s focal contraction (10% maximum) of the first dorsal interosseous (FDI). Over 5 blocks of 40 trials participants obtained points for increasing contraction speed and stability in FDI. In a final block, the interval between contractions was varied randomly to increase attention to the task. Over the first 5 blocks, SI declined as performance (points scored) improved. In the final "attention" block SI increased towards baseline without affecting performance. Although SI may be useful during the early stages of learning, skilled focal finger movement does not require SI to prevent activity in non-involved muscles. This could be due to better targeting of the excitatory command to move. Results from the final block suggest that increased attention can re-engage SI when task parameters change. SI is not necessary for successful focal contraction, but may contribute during learning and during attention to task. Copyright © 2016 International Federation of Clinical Neurophysiology. Published by Elsevier Ireland Ltd. All rights reserved.

  1. Mars power system concept definition study. Volume 2: Appendices

    NASA Technical Reports Server (NTRS)

    Littman, Franklin D.

    1994-01-01

    This report documents the work performed by Rockwell International's Rocketdyne Division on NASA Contract No. NAS3-25808 (Task Order No. 16) entitled 'Mars Power System Definition Study'. This work was performed for NASA's Lewis Research Center (LeRC). The report is divided into two volumes as follows: Volume 1 - Study Results; and Volume 2 - Appendices. The results of the power system characterization studies, operations studies, and technology evaluations are summarized in Volume 1. The appendices include complete, standalone technology development plans for each candidate power system that was investigated.

  2. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  3. Model-based analysis of fatigued human knee extensors : Effects of isometrically induced fatigue on Hill-type model parameters and ballistic contractions.

    PubMed

    Penasso, Harald; Thaller, Sigrid

    2018-05-05

    This study investigated the effect of isometrically induced fatigue on Hill-type muscle model parameters and related task-dependent effects. Parameter identification methods were used to extract fatigue-related parameter trends from isometric and ballistic dynamic maximum voluntary knee extensions. Nine subjects, who completed ten fatiguing sets, each consisting of nine 3 s isometric maximum voluntary contractions with 3 s rest plus two ballistic contractions with different loads, were analyzed. Only at the isometric task, the identified optimized model parameter values of muscle activation rate and maximum force generating capacity of the contractile element decreased from [Formula: see text] to [Formula: see text] Hz and from [Formula: see text] to [Formula: see text] N, respectively. For all tasks, the maximum efficiency of the contractile element, mathematically related to the curvature of the force-velocity relation, increased from [Formula: see text] to [Formula: see text]. The model parameter maximum contraction velocity decreased from [Formula: see text] to [Formula: see text] m/s and the stiffness of the serial elastic element from [Formula: see text] to [Formula: see text] N/mm. Thus, models of fatigue should consider fatigue dependencies in active as well as in passive elements, and muscle activation dynamics should account for the task dependency of fatigue.

  4. Integration of active pauses and pattern of muscular activity during computer work.

    PubMed

    St-Onge, Nancy; Samani, Afshin; Madeleine, Pascal

    2017-09-01

    Submaximal isometric muscle contractions have been reported to increase variability of muscle activation during computer work; however, other types of active contractions may be more beneficial. Our objective was to determine which type of active pause vs. rest is more efficient in changing muscle activity pattern during a computer task. Asymptomatic regular computer users performed a standardised 20-min computer task four times, integrating a different type of pause: sub-maximal isometric contraction, dynamic contraction, postural exercise and rest. Surface electromyographic (SEMG) activity was recorded bilaterally from five neck/shoulder muscles. Root-mean-square decreased with isometric pauses in the cervical paraspinals, upper trapezius and middle trapezius, whereas it increased with rest. Variability in the pattern of muscular activity was not affected by any type of pause. Overall, no detrimental effects on the level of SEMG during active pauses were found suggesting that they could be implemented without a cost on activation level or variability. Practitioner Summary: We aimed to determine which type of active pause vs. rest is best in changing muscle activity pattern during a computer task. Asymptomatic computer users performed a standardised computer task integrating different types of pauses. Muscle activation decreased with isometric pauses in neck/shoulder muscles, suggesting their implementation during computer work.

  5. Bridge-in-a-Backpack(TM) task 3.1: investigating soil - structure interaction - experimental design.

    DOT National Transportation Integrated Search

    2015-07-01

    This report includes fulfillment of Task 3.1 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 3 is an investigation of soil-structure interaction for the FRP tubes. Task 3.1 is the : design of...

  6. Bridge-in-a-Backpack(TM). Task 2.1 and 2.2 : investigate alternative shapes with varying radii.

    DOT National Transportation Integrated Search

    2015-02-01

    This report includes fulfillment of Tasks 2.1 and 2.2 of a multi-task contract to further enhance concrete filled FRP : tubes, or the Bridge in a Backpack. Task 2 is an investigation of alternative shapes for the FRP tubes with varying : radii. Task ...

  7. 77 FR 42349 - Self-Regulatory Organizations; NYSE Amex LLC; Order Approving a Proposed Rule Change Defining a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-18

    ... size pro-rata basis, and do not compete for the allocation of non-Directed Orders of five contracts or... than a round robin allocation of non-Directed Orders for five contracts or fewer, all such orders would... Specialist's quote size is less than the order of five contracts or fewer, any remaining contracts after the...

  8. HLLV avionics requirements study and electronic filing system database development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This final report provides a summary of achievements and activities performed under Contract NAS8-39215. The contract's objective was to explore a new way of delivering, storing, accessing, and archiving study products and information and to define top level system requirements for Heavy Lift Launch Vehicle (HLLV) avionics that incorporate Vehicle Health Management (VHM). This report includes technical objectives, methods, assumptions, recommendations, sample data, and issues as specified by DPD No. 772, DR-3. The report is organized into two major subsections, one specific to each of the two tasks defined in the Statement of Work: the Index Database Task and the HLLV Avionics Requirements Task. The Index Database Task resulted in the selection and modification of a commercial database software tool to contain the data developed during the HLLV Avionics Requirements Task. All summary information is addressed within each task's section.

  9. Outline for a theory of intelligence

    NASA Technical Reports Server (NTRS)

    Albus, James S.

    1991-01-01

    Intelligence is defined as that which produces successful behavior. Intelligence is assumed to result from natural selection. A model is proposed that integrates knowledge from research in both natural and artificial systems. The model consists of a hierarchical system architecture wherein: (1) control bandwidth decreases about an order of magnitude at each higher level, (2) perceptual resolution of spatial and temporal patterns contracts about an order-of-magnitude at each higher level, (3) goals expand in scope and planning horizons expand in space and time about an order-of-magnitude at each higher level, and (4) models of the world and memories of events expand their range in space and time by about an order-of-magnitude at each higher level. At each level, functional modules perform behavior generation (task decomposition planning and execution), world modeling, sensory processing, and value judgment. Sensory feedback control loops are closed at every level.

  10. 48 CFR 1016.505 - Ordering.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Ordering. 1016.505 Section 1016.505 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Indefinite-Delivery Contracts 1016.505 Ordering. (b)(6) Bureaus shall...

  11. 48 CFR 204.7007 - Order of application for modifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... numeric order of the modifications to a contract is not the order in which the changes to the contract... modifications will be applied in numeric order, followed by contract administration office modifications in numeric order. [77 FR 30368, May 22, 2012] ...

  12. 48 CFR 204.7007 - Order of application for modifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... numeric order of the modifications to a contract is not the order in which the changes to the contract... modifications will be applied in numeric order, followed by contract administration office modifications in numeric order. [77 FR 30368, May 22, 2012] ...

  13. 48 CFR 204.7007 - Order of application for modifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... numeric order of the modifications to a contract is not the order in which the changes to the contract... modifications will be applied in numeric order, followed by contract administration office modifications in numeric order. [77 FR 30368, May 22, 2012] ...

  14. Advanced Mirror Technology Development (AMTD) Project Status

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2014-01-01

    To date, AMTD Phase 1 has accomplished all of its technical tasks on-schedule and on-budget. AMTD was awarded a Phase 2 contract. We are now performing Phase 2 tasks along with those tasks continued from Phase 1.

  15. Bridge-in-a-backpack(TM) task 4 : development of improved arch concrete mix to facilitate field use.

    DOT National Transportation Integrated Search

    2016-02-01

    This report includes fulfillment of Task 4 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 4 investigates the development of improved concrete mixes for filling the FRP : tubes. : One critica...

  16. Bridge-in-a-Backpack(TM) task 4 : development of improved arch concrete mix to facilitate field use.

    DOT National Transportation Integrated Search

    2016-02-01

    This report includes fulfillment of Task 4 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 4 investigates the development of improved concrete mixes for filling the FRP : tubes. : One critica...

  17. Bridge-in-a-Backpack(TM) task 6 : guidelines for long term inspection and maintenance.

    DOT National Transportation Integrated Search

    2016-01-01

    This report includes fulfillment of Task 6 of a multi-task contract to further enhance concrete filled FRP tubes, or the Bridge in a Backpack. Task 6 provides guidelines for long term inspection and maintenance.This bridge consists of a buried arch s...

  18. Bridge-in-a-Backpack(TM) task 6 : guidelines for long term inspection and maintenance.

    DOT National Transportation Integrated Search

    2016-01-01

    This report includes fulfillment of Task 6 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 6 provides guidelines for long term inspection and maintenance. : This bridge consists of a buried a...

  19. Source analysis of beta-synchronisation and cortico-muscular coherence after movement termination based on high resolution electroencephalography.

    PubMed

    Muthuraman, Muthuraman; Tamás, Gertrúd; Hellriegel, Helge; Deuschl, Günther; Raethjen, Jan

    2012-01-01

    We hypothesized that post-movement beta synchronization (PMBS) and cortico-muscular coherence (CMC) during movement termination relate to each other and have similar role in sensorimotor integration. We calculated the parameters and estimated the sources of these phenomena.We measured 64-channel EEG simultaneously with surface EMG of the right first dorsal interosseus muscle in 11 healthy volunteers. In Task1, subjects kept a medium-strength contraction continuously; in Task2, superimposed on this movement, they performed repetitive self-paced short contractions. In Task3 short contractions were executed alone. Time-frequency analysis of the EEG and CMC was performed with respect to the offset of brisk movements and averaged in each subject. Sources of PMBS and CMC were also calculated.High beta power in Task1, PMBS in Task2-3, and CMC in Task1-2 could be observed in the same individual frequency bands. While beta synchronization in Task1 and PMBS in Task2-3 appeared bilateral with contralateral predominance, CMC in Task1-2 was strictly a unilateral phenomenon; their main sources did not differ contralateral to the movement in the primary sensorimotor cortex in 7 of 11 subjects in Task1, and in 6 of 9 subjects in Task2. In Task2, CMC and PMBS had the same latency but their amplitudes did not correlate with each other. In Task2, weaker PMBS source was found bilaterally within the secondary sensory cortex, while the second source of CMC was detected in the premotor cortex, contralateral to the movement. In Task3, weaker sources of PMBS could be estimated in bilateral supplementary motor cortex and in the thalamus. PMBS and CMC appear simultaneously at the end of a phasic movement possibly suggesting similar antikinetic effects, but they may be separate processes with different active functions. Whereas PMBS seems to reset the supraspinal sensorimotor network, cortico-muscular coherence may represent the recalibration of cortico-motoneuronal and spinal systems.

  20. [Progress of the ATM Crew}

    NASA Technical Reports Server (NTRS)

    Krabill, W. (Technical Monitor)

    2001-01-01

    Contract NAS5-99094 was initiated on December 1, 1998. The subject contract contains 5 tasks covering specific activities in support of 3 major sensor programs, each with a separate NASA Principal Investigator (PI). Accordingly, the bimonthly narrative is organized such that each of the programs are discussed separately with individual task activities presented within each of the programs. Acronyms are used throughout the report to keep the writing succinct. An attached glossary contains definitions for these acronyms.

  1. Bridge-in-a-backpack(TM) : task 3.2: investigating soil - structure interaction - modeling and experimental results of steel arches.

    DOT National Transportation Integrated Search

    2015-07-01

    This report includes fulfillment of Task 3.2 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 3 is an investigation of soil-structure interaction for the FRP tubes. Task 3.2 is the : modeling ...

  2. Bridge-in-a-backpack(TM) task 3.3 : investigate soil-structure interaction-modeling and experimental results of concrete filled FRP tube arches.

    DOT National Transportation Integrated Search

    2015-12-01

    This report includes fulfillment of Task 3.3 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 3 is an investigation of soil-structure interaction for the FRP tubes. Task 3.3 is the : modeling ...

  3. Bridge-in-a-Backpack(TM). Task 2.3 : low-rise arch study with soil-structure interaction and spread footing foundation.

    DOT National Transportation Integrated Search

    2015-01-01

    This report includes fulfillment of Task 2.3 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 2 is an investigation of alternative shapes for the FRP tubes with varying radii. Task : 2.3 explo...

  4. Summary document of tasks performed on the Shuttle-C/NLS contract

    NASA Technical Reports Server (NTRS)

    1993-01-01

    During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

  5. Impulsive Approach Tendencies towards Physical Activity and Sedentary Behaviors, but Not Reflective Intentions, Prospectively Predict Non-Exercise Activity Thermogenesis

    PubMed Central

    Cheval, Boris; Sarrazin, Philippe; Pelletier, Luc

    2014-01-01

    Understanding the determinants of non-exercise activity thermogenesis (NEAT) is crucial, given its extensive health benefits. Some scholars have assumed that a proneness to react differently to environmental cues promoting sedentary versus active behaviors could be responsible for inter-individual differences in NEAT. In line with this reflection and grounded on the Reflective-Impulsive Model, we test the assumption that impulsive processes related to sedentary and physical activity behaviors can prospectively predict NEAT, operationalized as spontaneous effort exerted to maintain low intensity muscle contractions within the release phases of an intermittent maximal isometric contraction task. Participants (n = 91) completed a questionnaire assessing their intentions to adopt physical activity behaviors and a manikin task to assess impulsive approach tendencies towards physical activity behaviors (IAPA) and sedentary behaviors (IASB). Participants were then instructed to perform a maximal handgrip strength task and an intermittent maximal isometric contraction task. As hypothesized, multilevel regression analyses revealed that spontaneous effort was (a) positively predicted by IAPA, (b) negatively predicted by IASB, and (c) was not predicted by physical activity intentions, after controlling for some confounding variables such as age, sex, usual PA level and average force provided during the maximal-contraction phases of the task. These effects remained constant throughout all the phases of the task. This study demonstrated that impulsive processes may play a unique role in predicting spontaneous physical activity behaviors. Theoretically, this finding reinforces the utility of a motivational approach based on dual-process models to explain inter-individual differences in NEAT. Implications for health behavior theories and behavior change interventions are outlined. PMID:25526596

  6. Impulsive approach tendencies towards physical activity and sedentary behaviors, but not reflective intentions, prospectively predict non-exercise activity thermogenesis.

    PubMed

    Cheval, Boris; Sarrazin, Philippe; Pelletier, Luc

    2014-01-01

    Understanding the determinants of non-exercise activity thermogenesis (NEAT) is crucial, given its extensive health benefits. Some scholars have assumed that a proneness to react differently to environmental cues promoting sedentary versus active behaviors could be responsible for inter-individual differences in NEAT. In line with this reflection and grounded on the Reflective-Impulsive Model, we test the assumption that impulsive processes related to sedentary and physical activity behaviors can prospectively predict NEAT, operationalized as spontaneous effort exerted to maintain low intensity muscle contractions within the release phases of an intermittent maximal isometric contraction task. Participants (n = 91) completed a questionnaire assessing their intentions to adopt physical activity behaviors and a manikin task to assess impulsive approach tendencies towards physical activity behaviors (IAPA) and sedentary behaviors (IASB). Participants were then instructed to perform a maximal handgrip strength task and an intermittent maximal isometric contraction task. As hypothesized, multilevel regression analyses revealed that spontaneous effort was (a) positively predicted by IAPA, (b) negatively predicted by IASB, and (c) was not predicted by physical activity intentions, after controlling for some confounding variables such as age, sex, usual PA level and average force provided during the maximal-contraction phases of the task. These effects remained constant throughout all the phases of the task. This study demonstrated that impulsive processes may play a unique role in predicting spontaneous physical activity behaviors. Theoretically, this finding reinforces the utility of a motivational approach based on dual-process models to explain inter-individual differences in NEAT. Implications for health behavior theories and behavior change interventions are outlined.

  7. 40 CFR 35.938-5 - Negotiation of contract amendments (change orders).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Negotiation of contract amendments...-Clean Water Act § 35.938-5 Negotiation of contract amendments (change orders). (a) Grantee responsibility. Grantees are responsible for negotiation of construction contract change orders. This function...

  8. 40 CFR 35.938-5 - Negotiation of contract amendments (change orders).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Negotiation of contract amendments...-Clean Water Act § 35.938-5 Negotiation of contract amendments (change orders). (a) Grantee responsibility. Grantees are responsible for negotiation of construction contract change orders. This function...

  9. 40 CFR 35.938-5 - Negotiation of contract amendments (change orders).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Negotiation of contract amendments...-Clean Water Act § 35.938-5 Negotiation of contract amendments (change orders). (a) Grantee responsibility. Grantees are responsible for negotiation of construction contract change orders. This function...

  10. 40 CFR 35.938-5 - Negotiation of contract amendments (change orders).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Negotiation of contract amendments...-Clean Water Act § 35.938-5 Negotiation of contract amendments (change orders). (a) Grantee responsibility. Grantees are responsible for negotiation of construction contract change orders. This function...

  11. 40 CFR 35.938-5 - Negotiation of contract amendments (change orders).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Negotiation of contract amendments...-Clean Water Act § 35.938-5 Negotiation of contract amendments (change orders). (a) Grantee responsibility. Grantees are responsible for negotiation of construction contract change orders. This function...

  12. 78 FR 48728 - International Mail Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-39; Order No. 1798] International Mail Contract... provide its contracting partner, on a periodic basis, with a list of countries to which Commercial ePacket... an Additional Global Plus 1C Contract, January 11, 2013. IV. Ordering Paragraphs It is ordered: 1...

  13. Control of optical systems

    NASA Technical Reports Server (NTRS)

    Founds, D.

    1988-01-01

    Some of the current and planned activities at the Air Force Systems Command in structures and controls for optical-type systems are summarized. Many of the activities are contracted to industry; one task is an in-house program which includes a hardware test program. The objective of the in-house program, referred to as the Aluminum Beam Expander Structure (ABES), is to address issues involved in on-orbit system identification. The structure, which appears similar to the LDR backup structure, is about 35 feet tall. The activity to date has been limited to acquisition of about 250 hours of test data. About 30 hours of data per excitation force is gathered in order to obtain sufficient data for a good statistical estimate of the structural parameters. The development of an Integrated Structural Modeling (ISM) computer program is being done by Boeing Aerospace Company. The objective of the contracted effort is to develop a combined optics, structures, thermal, controls, and multibody dynamics simulation code.

  14. Where neuroscience and dynamic system theory meet autonomous robotics: a contracting basal ganglia model for action selection.

    PubMed

    Girard, B; Tabareau, N; Pham, Q C; Berthoz, A; Slotine, J-J

    2008-05-01

    Action selection, the problem of choosing what to do next, is central to any autonomous agent architecture. We use here a multi-disciplinary approach at the convergence of neuroscience, dynamical system theory and autonomous robotics, in order to propose an efficient action selection mechanism based on a new model of the basal ganglia. We first describe new developments of contraction theory regarding locally projected dynamical systems. We exploit these results to design a stable computational model of the cortico-baso-thalamo-cortical loops. Based on recent anatomical data, we include usually neglected neural projections, which participate in performing accurate selection. Finally, the efficiency of this model as an autonomous robot action selection mechanism is assessed in a standard survival task. The model exhibits valuable dithering avoidance and energy-saving properties, when compared with a simple if-then-else decision rule.

  15. 48 CFR 2452.237-70 - Key personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracts when it is necessary for contract performance to identify the contractor's key personnel: Key... perform as follows: [List Key Personnel and/or positions, and tasks, percentage of effort, number of hours...

  16. [Operation/Maintenance of Fiber Placement Machine

    NASA Technical Reports Server (NTRS)

    Pelham, L.; Dillard, T.

    2000-01-01

    NASA contract NAS8-39749 was completed in January 2000. The contract period of performance covered six (6) years and included basic program technical support as required by NASA with up to thirty (30) different technical directives identified and issued by NASA for specific Advanced Composite Technology tasks during the course of the contract.

  17. Improved silicon carbide for advanced heat engines

    NASA Technical Reports Server (NTRS)

    Whalen, Thomas J.

    1987-01-01

    This is the second annual technical report entitled, Improved Silicon Carbide for Advanced Heat Engines, and includes work performed during the period February 16, 1986 to February 15, 1987. The program is conducted for NASA under contract NAS3-24384. The objective is the development of high strength, high reliability silicon carbide parts with complex shapes suitable for use in advanced heat engines. The fabrication methods used are to be adaptable for mass production of such parts on an economically sound basis. Injection molding is the forming method selected. This objective is to be accomplished in a two-phase program: (1) to achieve a 20 percent improvement in strength and a 100 percent increase in Weibull modulus of the baseline material; and (2) to produce a complex shaped part, a gas turbine rotor, for example, with the improved mechanical properties attained in the first phase. Eight tasks are included in the first phase covering the characterization of the properties of a baseline material, the improvement of those properties and the fabrication of complex shaped parts. Activities during the first contract year concentrated on two of these areas: fabrication and characterization of the baseline material (Task 1) and improvement of material and processes (Task 7). Activities during the second contract year included an MOR bar matrix study to improve mechanical properties (Task 2), materials and process improvements (Task 7), and a Ford-funded task to mold a turbocharger rotor with an improved material (Task 8).

  18. Procurement Contracting Officer’s Guide to Cost Accounting Standards,

    DTIC Science & Technology

    1977-09-01

    ACCESSION MO r P.R0CUR2K2NT CONTRACTING ^FFICDR’S %UID2 TO COST ACCOUNTING STANDARDS. .-IB’ i 4fiSj irPBVPWra ONOANIZATION NAME MB AOONESS...discussing the history and development of Cost Accounting Standards, the functions of the Cost Accounting Standards Board, and the methodology...20. Abstract (continued) the tasks that Cost Accounting Standards have placed on the procurement officer. 3y understanding these tasks the

  19. Extending the limits of force endurance: Stimulation of the motor or the frontal cortex?

    PubMed

    Radel, Rémi; Tempest, Gavin; Denis, Gauthier; Besson, Pierre; Zory, Raphael

    2017-12-01

    Previous findings indicate that facilitation of primary motor cortex (PMC) activity using trans-cranial direct current stimulation (tDCS) could improve resistance to physical fatigue. However, studies have failed to consistently replicate these results. Using non-focal-tDCS during a fatiguing task, recent work showed no enhancement of corticospinal excitability of the PMC despite a longer endurance time and suggested that contamination in other brain regions involved in motor command may have occurred. In accordance with recent evidence supporting the role of the prefrontal cortex (PFC) in exercise maintenance, this double-blind sham-controlled crossover study (N = 22) compared the effect of high definition (HD)-tDCS of the PMC or the PFC on endurance time of a sustained contraction task of the elbow flexor. Brain activity was monitored using near infrared spectroscopy (NIRS) to measure the neurovascular response elicited by HD-tDCS. Electromyography (EMG) and force obtained during maximal voluntary and evoked contractions were assessed before and after the contraction task to explore the effect of brain stimulation on peripheral and central fatigue. While the stimulation affected the brain response in the PFC during the contraction task, no effects of the stimulation were observed on endurance time or fatigue indices. These results are discussed in relation to the neurocognitive models of physical effort. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    DTIC Science & Technology

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  1. Splicing and local reinforcement of concrete filled FRP tubes.

    DOT National Transportation Integrated Search

    2014-01-01

    This report includes fulfillment of Task 1 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 1 investigates and develops a feasible solution for splicing the concrete filled FRP : tubes. This w...

  2. Manning's roughness coefficient for buried composite arch bridges.

    DOT National Transportation Integrated Search

    2014-08-01

    This report includes fulfillment of Task 9 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 9 investigates the interaction of water flow under the bridge with the tubes and : decking and recom...

  3. 48 CFR 1852.232-81 - Contract funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... allotment is for [Insert applicable item number(s), task(s), or work description] _____ and covers the following estimated period of performance: _____. (b) An additional amount of $______ is obligated under...

  4. 48 CFR 813.106-70 - Oral purchase orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Oral purchase orders. 813... CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Procedures 813.106-70 Oral purchase orders. When advantageous to VA, the contracting officer may use an oral purchase order for transactions...

  5. 77 FR 2679 - Defense Federal Acquisition Regulation Supplement: Order of Application for Modifications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... following methods: [cir] Regulations.gov : http://www.regulations.gov . Submit comments via the Federal e... contract. In order to determine the sequence of modifications to a contract or order, a method for... the numeric order of the modifications to a contract is not the order in which the changes to the...

  6. SXI Prototype mirror mount

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This final report describes the work performed from June 1993 to January 1995. The purpose of this contract was to provide optomechanical engineering and fabrication support to the Solar X-ray Imager (SXI) program in the areas of mirror, optical bench and camera assemblies of the telescope. The Center for Applied Optics (CAO) worked closely with the Optics and S&E technical staff of MSFC to develop and investigate the most viable and economical options for the design and fabrication of a number of parts for the various telescope assemblies. All the tasks under this delivery order have been successfully completed within budget and schedule.

  7. Studies of Verbal Problem Solving. 1. Two Performance-Aiding Programs

    DTIC Science & Technology

    1977-09-01

    5. Effective Date of Contract 6. Contract Expiration Date 7. Amount of Contract 8. Contract Number 9. Principal Investigator 10 . Scientific...7 10 3. A Mystery Solved by Propositional Calculus 16 1v I. INTRODUCTION Certain intellectual tasks, such as estimating and combining prob...aids or without any special training, they get the right answer within 15 minutes or so (about 80% of one large psychology class solved it). A few

  8. 48 CFR 611.603 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracting officers are authorized to sign DO-H8 rated contracts or orders. It is the responsibility of the requirements office to determine which contracts or orders should be rated. All contracts with U.S. firms under the DOSESPP will not necessarily need to be assigned a priority rating. (g) The contracting officer...

  9. 48 CFR 611.603 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contracting officers are authorized to sign DO-H8 rated contracts or orders. It is the responsibility of the requirements office to determine which contracts or orders should be rated. All contracts with U.S. firms under the DOSESPP will not necessarily need to be assigned a priority rating. (g) The contracting officer...

  10. An Investigation into the Nature of Non-Voiding Contractions Resulting from Detrusor Hyperreflexia in Neurogenic Bladders Following Spinal Cord Injury

    DTIC Science & Technology

    2015-06-01

    occasioned by numerous, rhythmic high pressure non-voiding contractions (NVC) during normal bladder filling. These NVC are responsible for incontinence...month experiment period) 2c. Final data analysis (data analysis will be ongoing throughout, this will represent the finalization of data period, 0.25...Sub-Tasks 2a and 2b. As of 9/2/14, we have completed much of the data analysis (Sub-Task 2c; see below for results). Analysis of abdominal

  11. Ada/Xt Architecture: Design Report for the Software Technology for Adaptable, Reliable Systems (STARS)

    DTIC Science & Technology

    1990-01-25

    N Task: UR20 CDRL: 01000 N UR2O--ProcesslEnvironmentx Ada/Xt. Architecture : Design Report ~ ~ fFCp Informal Technical Data I? ,LECp Sofwar Tehoog for...S. FUNDING NUMBERS Ada/Xt Architecture : Design Report STARS Contract 6.AUTHOR(S)_ Ft9628-88-D-0031 6. AUTHOR(S) Kurt Wallnau 7. PERFORMING...of the STARS Prime contract under the Process Environment Integration task (UR20). This document "Ada Xt Architecture : Design Report", type A005

  12. Domain-General Contributions to Social Reasoning: Theory of Mind and Deontic Reasoning Re-Explored

    ERIC Educational Resources Information Center

    McKinnon, Margaret C.; Moscovitch, Morris

    2007-01-01

    Using older adults and dual-task interference, we examined performance on two social reasoning tasks: theory of mind (ToM) tasks and versions of the deontic selection task involving social contracts and hazardous conditions. In line with performance accounts of social reasoning (Leslie, Friedman, & German, 2004), evidence from both aging and the…

  13. Fatigability and Recovery of Arm Muscles with Advanced Age for Dynamic and Isometric Contractions

    PubMed Central

    Yoon, Tejin; Schlinder-Delap, Bonnie; Hunter, Sandra K.

    2012-01-01

    This study determined whether age-related mechanisms can increase fatigue of arm muscles during maximal velocity dynamic contractions, as occurs in the lower limb. We compared elbow flexor fatigue of young (n=10, 20.8 ± 2.7 years) and old men (n=16, 73.8 ± 6.1 years) during and in recovery from a dynamic and an isometric postural fatiguing task. Each task was maintained until failure while supporting a load equivalent to 20% of maximal voluntary isometric contraction (MVIC) torque. Transcranial magnetic stimulation (TMS) was used to assess supraspinal fatigue (superimposed twitch, SIT) and muscle relaxation. Time to failure was longer for old men than young for the isometric task (9.5±3.1 vs. 17.2±7.0 min, P=0.01) but similar for the dynamic task (6.3±2.4 min vs. 6.0±2.0 min, P = 0.73). Initial peak rate of relaxation was slower for the old men than young, and associated with a longer time to failure for both tasks (P<0.05). Low initial power during elbow flexion was associated with the greatest difference (reduction) in time to failure between the isometric task and dynamic task (r =−0.54, P=0.015). SIT declined after both fatigue tasks similarly with age, although recovery of SIT was associated with MVIC recovery for the old (both sessions) but not the young. Biceps brachii and brachioradialis EMG activity (%MVIC) of old men were greater than young during the dynamic fatiguing task (P<0.05), but similar during the isometric task. Muscular mechanisms and greater relative muscle activity (EMG activity) explain the greater fatigue during dynamic task for the old men compared with young in elbow flexor muscles. Recovery of MVC torque however relies more on recovery of supraspinal fatigue among older men than the young men. PMID:23103238

  14. Bridge-in-a-Backpack(TM). Task 8 : investigation of bridge performance under extreme temperatures.

    DOT National Transportation Integrated Search

    2014-12-01

    This report includes fulfillment of Task 8 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. : One recurring question has been its performance in fire conditions, mainly small campfires and handheld...

  15. Electrodynamic Tether Operations and Control

    NASA Technical Reports Server (NTRS)

    Glaese, John R.

    2001-01-01

    This Final Report is organized by tasks from the statement of work (SOW). A brief statement of each task with its task description followed by a discussion of the work performed is presented. The period of performance for this contract phase was from July 21, 2000 to March 19, 2001.

  16. 77 FR 43780 - Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour Contracts and Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour Contracts and Orders AGENCIES... changing the scope of work for a time-and-materials (T&M) or labor-hour (LH) contract or order. DATES...-043, ``Time-and-Materials and Labor-Hour Contracts for Commercial Items'', was published as a final...

  17. 48 CFR 43.204 - Administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Administration. 43.204... CONTRACT MODIFICATIONS Change Orders 43.204 Administration. (a) Change order documentation. When change... adjusting the contract delivery schedule. (3) Contracting offices and contract administration offices, as...

  18. 48 CFR 43.204 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Administration. 43.204... CONTRACT MODIFICATIONS Change Orders 43.204 Administration. (a) Change order documentation. When change... adjusting the contract delivery schedule. (3) Contracting offices and contract administration offices, as...

  19. 48 CFR 43.204 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Administration. 43.204... CONTRACT MODIFICATIONS Change Orders 43.204 Administration. (a) Change order documentation. When change... adjusting the contract delivery schedule. (3) Contracting offices and contract administration offices, as...

  20. Pupil diameter as predictor of cognitive load: A novel tool for geoscience education research

    NASA Astrophysics Data System (ADS)

    Mitra, R.; McNeal, K.

    2015-12-01

    Pupils can truly serve as windows to the mind. Since the early part of the last decade, pupillometry, the study of pupils in response to cognitive tasks, have gained traction in psychophysiological studies. Muscles of the iris work in tandem with the autonomic nervous system in response to light condition to either dilate or contract the pupil, usually between 2 to 7 mm. Along with this response to light conditions, the pupils also contract or dilate in response to emotional or mental response. Therefore, for a cognitive task, if the ambient brightness is controlled, pupil dilation reflects the cognitive load associated with the task. Simple tasks such as counting, memorizing, multiplying and visual searching have been found to have pupillometry profiles reflective of the cognitive load involved with such tasks. In this study, we investigate whether pupil diameter can be used for education research where tasks can be more complex. In particular, we look at two specific types of tasks common in geoscience and several other STEM fields: graph reading and spatial problem solving.

  1. Effects of knee and ankle muscle fatigue on postural control in the unipedal stance.

    PubMed

    Bizid, Riadh; Margnes, Eric; François, Yrieix; Jully, Jean Louis; Gonzalez, Gerard; Dupui, Philippe; Paillard, Thierry

    2009-06-01

    The aim of this study was to compare the effects of acute muscle fatigue of the ankle and knee musculature on postural control by immediate measures after performing fatiguing tasks (POST condition). One group of subjects (n = 8) performed a fatiguing task by voluntary contractions of the triceps surae (group TRI) and the other (n = 9) performed a fatiguing task by voluntary contractions of the quadriceps femoris (group QUA). Each muscle group was exercised until the loss of maximal voluntary contraction torque reached 50% (isokinetic dynamometer). Posture was assessed by measuring the centre of foot pressure (COP) with a force platform during a test of unipedal quiet standing posture with eyes closed. Initially (in PRE condition), the mean COP velocity was not significantly different between group TRI and group QUA. In POST condition, the mean COP velocity increased more in group QUA than in group TRI. The postural control was more impaired by knee muscle fatigue than by ankle muscle fatigue.

  2. [Social exchange and inference: an experimental study with the Wason selection task].

    PubMed

    Hayashi, N

    2001-04-01

    Social contract theory (Cosmides, 1989) posits that the human mind was equipped with inference faculty specialized for cheater detection. Cosmides (1989) conducted a series of experiments employing the Wason selection task to demonstrate that her social contract theory could account for the content effects reported in the literature. The purpose of this study was to investigate the possibility that the results were due to experimental artifacts. In the current experiment, the subject was given two versions of the Wason task that contained no social exchange context, but included an instruction implying him/her to look for something, together with the cassava root and the abstract versions used by Cosmides (1989). Results showed that the two versions with no social exchange context produced the same response pattern observed in the original study. It may be concluded that the subject's perception of the rule as a social contract was not necessary to obtain the original results, and that an instruction implying that he/she should look for something was sufficient.

  3. Vermont travel model 2010-2011 (year 3) report.

    DOT National Transportation Integrated Search

    2012-10-01

    This report is being prepared under Task 1 of the Maintenance, Operation and Evaluation of the VTrans Statewide Transportation Model contract with the Vermont Agency of Transportation (VTrans) in the 2010-2011 year of the contract. The objectiv...

  4. Space Transportation Systems Technologies

    NASA Technical Reports Server (NTRS)

    Laue, Jay H.

    2001-01-01

    This document is the final report by the Science Applications International Corporation (SAIC) on contracted support provided to the National Aeronautics and Space Administration (NASA) under Contract NAS8-99060, 'Space Transportation Systems Technologies'. This contract, initiated by NASA's Marshall Space Flight Center (MSFC) on February 8, 1999, was focused on space systems technologies that directly support NASA's space flight goals. It was awarded as a Cost-Plus-Incentive-Fee (CPIF) contract to SAIC, following a competitive procurement via NASA Research Announcement, NRA 8-21. This NRA was specifically focused on tasks related to Reusable Launch Vehicles (RLVs). Through Task Area 3 (TA-3), "Other Related Technology" of this NRA contract, SAIC extensively supported the Space Transportation Directorate of MSFC in effectively directing, integrating, and setting its mission, operations, and safety priorities for future RLV-focused space flight. Following an initially contracted Base Year (February 8, 1999 through September 30, 1999), two option years were added to the contract. These were Option Year 1 (October 1, 1999 through September 30, 2000) and Option Year 2 (October 1, 2000 through September 30, 2001). This report overviews SAIC's accomplishments for the Base Year, Option Year 1, and Option Year 2, and summarizes the support provided by SAIC to the Space Transportation Directorate, NASA/MSFC.

  5. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  6. The influence of muscle length on the fatigue-related reduction in joint range of motion of the human dorsiflexors.

    PubMed

    Cheng, Arthur J; Davidson, Andrew W; Rice, Charles L

    2010-06-01

    The fatigue-related reduction in joint range of motion (ROM) during dynamic contraction tasks may be related to muscle length-dependent alterations in torque and contractile kinetics, but this has not been systematically explored previously. Twelve young men performed a repetitive voluntary muscle shortening contraction task of the dorsiflexors at a contraction load of 30% of maximum voluntary isometric contraction (MVC) torque, until total 40 degrees ROM had decreased by 50% at task failure (POST) to 20 degrees ROM. At both a short (5 degrees dorsiflexion) and long muscle length (35 degrees plantar flexion joint angle relative to a 0 degrees neutral ankle joint position), voluntary activation, MVC torque, and evoked tibialis anterior contractile properties of a 52.8 Hz high-frequency isometric tetanus [peak evoked torque, maximum rate of torque development (MRTD), maximum rate of relaxation (MRR)] were evaluated at baseline (PRE), at POST, and up to 10 min of recovery. At POST, we measured similar fatigue-related reductions in torque (voluntary and evoked) and slowing of contractile kinetics (MRTD and MRR) at both the short and long muscle lengths. Thus, the fatigue-related reduction in ROM could not be explained by length-dependent fatigue. Although torque (voluntary and evoked) at both muscle lengths was depressed and remained blunted throughout the recovery period, this was not related to the rapid recovery of ROM at 0.5 min after task failure. The reduction in ROM, however, was strongly related to the reduction in joint angular velocity (R(2) = 0.80) during the fatiguing task, although additional factors cannot yet be overlooked.

  7. Tool development in threat assessment: syntax regularization and correlative analysis. Final report Task I and Task II, November 21, 1977-May 21, 1978. [Linguistic analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miron, M.S.; Christopher, C.; Hirshfield, S.

    1978-05-01

    Psycholinguistics provides crisis managers in nuclear threat incidents with a quantitative methodology which can aid in the determination of threat credibility, authorship identification and perpetrator apprehension. The objective of this contract is to improve and enhance present psycholinguistic software systems by means of newly-developed, computer-automated techniques which significantly extend the technology of automated content and stylistic analysis of nuclear threat. In accordance with this overall objective, the first two contract Tasks have been completed and are reported on in this document. The first Task specifies the development of software support for the purpose of syntax regularization of vocabulary to rootmore » form. The second calls for the exploration and development of alternative approaches to correlative analysis of vocabulary usage.« less

  8. Research, planning, design and development of selected components, subsystems and systems for the Students for the Exploration and Development of Space Satellite (SEDSAT)

    NASA Technical Reports Server (NTRS)

    Wingo, Dennis

    1997-01-01

    The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the SEDSAT satellite to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The SEASIS instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was cancelled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.

  9. 3 CFR 13494 - Executive Order 13494 of January 30, 2009. Economy in Government Contracting

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 3 The President 1 2010-01-01 2010-01-01 false Executive Order 13494 of January 30, 2009. Economy in Government Contracting 13494 Order 13494 Presidential Documents Executive Orders Executive Order 13494 of January 30, 2009 EO 13494 Economy in Government Contracting By the authority vested in me as President by the Constitution and the laws of th...

  10. 78 FR 4502 - Self-Regulatory Organizations; BATS Exchange, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Exchange currently charges $0.11 per contract for Customer orders executed at NYSE MKT LLC (``AMEX''), BOX... Customer orders executed at MIAX and $0.57 per contract for Professional, Firm, and Market Maker orders executed at MIAX. As noted above, the Exchange currently charges $0.11 per contract for Customer orders and...

  11. How Recent History Affects Perception: The Normative Approach and Its Heuristic Approximation

    PubMed Central

    Raviv, Ofri; Ahissar, Merav; Loewenstein, Yonatan

    2012-01-01

    There is accumulating evidence that prior knowledge about expectations plays an important role in perception. The Bayesian framework is the standard computational approach to explain how prior knowledge about the distribution of expected stimuli is incorporated with noisy observations in order to improve performance. However, it is unclear what information about the prior distribution is acquired by the perceptual system over short periods of time and how this information is utilized in the process of perceptual decision making. Here we address this question using a simple two-tone discrimination task. We find that the “contraction bias”, in which small magnitudes are overestimated and large magnitudes are underestimated, dominates the pattern of responses of human participants. This contraction bias is consistent with the Bayesian hypothesis in which the true prior information is available to the decision-maker. However, a trial-by-trial analysis of the pattern of responses reveals that the contribution of most recent trials to performance is overweighted compared with the predictions of a standard Bayesian model. Moreover, we study participants' performance in a-typical distributions of stimuli and demonstrate substantial deviations from the ideal Bayesian detector, suggesting that the brain utilizes a heuristic approximation of the Bayesian inference. We propose a biologically plausible model, in which decision in the two-tone discrimination task is based on a comparison between the second tone and an exponentially-decaying average of the first tone and past tones. We show that this model accounts for both the contraction bias and the deviations from the ideal Bayesian detector hypothesis. These findings demonstrate the power of Bayesian-like heuristics in the brain, as well as their limitations in their failure to fully adapt to novel environments. PMID:23133343

  12. Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Vandenberg, Nancy R.; Ma, C. (Technical Monitor)

    2001-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

  13. Support for the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Ma, C. (Technical Monitor)

    2001-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

  14. An Investigation into the Nature of Non-Voiding Contractions Resulting from Detrusor Hyperreflexia in Neurogenic Bladders Following Spinal Cord Injury

    DTIC Science & Technology

    2014-10-01

    SCI) is often occasioned by numerous, rhythmic high pressure non-voiding contractions (NVC) during normal bladder filling. These NVC are...addition to the 16.5 month experiment period) 2c. Final data analysis (data analysis will be ongoing throughout, this will represent the finalization...accomplished. We accomplished Sub-Tasks 2a and 2b. As of 9/2/14, we have completed much of the data analysis (Sub-Task 2c; see below for results). Analysis

  15. Smart Shutdown Guidebook: Considerations for a Successful Shutdown

    DTIC Science & Technology

    2014-01-01

    multiple countries, multiple contractors) or in number of subsystems and interfaces • State of the contract (is the procuring contract officer ( PCO ...assigned tasks. • Includes the procuring, administrative, and terminating contracting officers ( PCOs , ACOs, and TCOs). 6 • Assigns full authority and...assist the PCO and TCO with their correspondence requirements with contractors and to assist higher leadership in its communication with external

  16. 23 CFR 172.5 - Methods of procurement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...

  17. 48 CFR 552.216-71 - Economic Price Adjustment-Special Order Program Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Economic Price Adjustment... Provisions and Clauses 552.216-71 Economic Price Adjustment—Special Order Program Contracts. As prescribed in 516.203-4(a), insert the following clause: Economic Price Adjustment—Special Order Program Contracts...

  18. 48 CFR 552.216-71 - Economic Price Adjustment-Special Order Program Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Economic Price Adjustment... Provisions and Clauses 552.216-71 Economic Price Adjustment—Special Order Program Contracts. As prescribed in 516.203-4(a), insert the following clause: Economic Price Adjustment—Special Order Program Contracts...

  19. 48 CFR 552.216-71 - Economic Price Adjustment-Special Order Program Contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Economic Price Adjustment... Provisions and Clauses 552.216-71 Economic Price Adjustment—Special Order Program Contracts. As prescribed in 516.203-4(a), insert the following clause: Economic Price Adjustment—Special Order Program Contracts...

  20. 48 CFR 552.216-71 - Economic Price Adjustment-Special Order Program Contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Economic Price Adjustment... Provisions and Clauses 552.216-71 Economic Price Adjustment—Special Order Program Contracts. As prescribed in 516.203-4(a), insert the following clause: Economic Price Adjustment—Special Order Program Contracts...

  1. 48 CFR 552.216-71 - Economic Price Adjustment-Special Order Program Contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Economic Price Adjustment... Provisions and Clauses 552.216-71 Economic Price Adjustment—Special Order Program Contracts. As prescribed in 516.203-4(a), insert the following clause: Economic Price Adjustment—Special Order Program Contracts...

  2. Bridge-in-a-Backpack(TM). Task 7 : investigation of damage and repairs for concrete filled FRP tubular arches.

    DOT National Transportation Integrated Search

    2015-04-01

    This report includes fulfillment of Task 7 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. : Damage due to impact of the FRP shell of the concrete filled FRP tubular arch bridges has been and stil...

  3. Industrial Electrical Maintenance Learning Guides and Task Listing by Occupational Titles.

    ERIC Educational Resources Information Center

    Whitmer, Melvin

    Seven student learning guides are provided for an industrial electrical maintenance program at the secondary, postsecondary, or adult level. Each learning guide is composed of these component parts: a title page that states the task, purpose, program and task numbers, estimated time, and prerequisites; an optional learning contract that includes…

  4. Age Differences in Dynamic Fatigability and Variability of Arm and Leg Muscles: Associations with Physical Function

    PubMed Central

    Senefeld, Jonathon; Yoon, Tejin; Hunter, Sandra K.

    2016-01-01

    Introduction It is not known whether the age-related increase in fatigability of fast dynamic contractions in lower limb muscles also occurs in upper limb muscles. We compared age-related fatigability and variability of maximal-effort repeated dynamic contractions in the knee extensor and elbow flexor muscles; and determined associations between fatigability, variability of velocity between contractions and functional performance. Methods 35 young (16 males; 21.0±2.6 years) and 32 old (18 males; 71.3±6.2 years) adults performed a dynamic fatiguing task involving 90 maximal-effort, fast, concentric, isotonic contractions (1 contraction/3 s) with a load equivalent to 20% maximal voluntary isometric contraction (MVIC) torque with the elbow flexor and knee extensor muscles on separate days. Old adults also performed tests of balance and walking endurance. Results Old adults had greater fatigue-related reductions in peak velocity compared with young adults for both the elbow flexor and knee extensor muscles (P<0.05) with no sex differences (P>0.05). Old adults had greater variability of peak velocity during the knee extensor, but not during the elbow flexor fatiguing task. The age difference in fatigability was greater for the knee extensor muscles (35.9%) compared with elbow flexor muscles (9.7%, P<0.05). Less fatigability of the knee extensor muscles was associated with greater walking endurance (r=−0.34, P=0.048) and balance (r=−0.41, P=0.014) among old adults. Conclusions An age-related increase in fatigability of a dynamic fatiguing task was greater for the knee extensor compared with the elbow flexor muscles in males and females, and greater fatigability was associated with lesser walking endurance and balance. PMID:27989926

  5. 48 CFR 1552.235-80 - Access to confidential business information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) during the performance of tasks required under this contract. However, the following applies to any and all tasks under which the contractor will or may have access to CBI: The contractor shall not have...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The study was funded by the U.S. Trade and Development Agency on behalf of the Municipality of Greater Istanbul. Summarized in the report are the results of two feasibility studies. The first, referred to as Task No. 6, was conducted to develop technical specifications and terms of reference for the design, construction, and operation of a landfill gas-to-electrical energy project at a new European landfill. The second, the Umraniye Dump Stabilization Project (Task No. 7), addresses the stabilization measures necessary to prevent future failure at the Umraniye dump site. The summary report is divided into the following sections: Task No.more » 6-(1) Terms of reference for the DBOT Contract; (2) Estimated Value of the DBOT Contracts; (3) Foreign Trade Potential; (4) Project Financing; Task No. 7-(1) Results of the Services; (2) Foreign Trade Potential. Also included is a list of U.S. solid waste firms, landfill gas recovery and energy generation firms, and equipment and product suppliers.« less

  7. Definition of ground test for verification of large space structure control

    NASA Technical Reports Server (NTRS)

    Glaese, John R.

    1994-01-01

    Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.

  8. 48 CFR 1352.215-70 - Proposal preparation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Complete the Past Performance Questionnaire (Attachment X) for all contracts containing requirements... important events or tasks. If applicable, the offeror shall (i) describe the facilities and equipment which will be used in the performance of the contract, and (ii) how the management and coordination of...

  9. Modulation of muscle-tendon interaction in the human triceps surae during an energy dissipation task.

    PubMed

    Werkhausen, Amelie; Albracht, Kirsten; Cronin, Neil J; Meier, Rahel; Bojsen-Møller, Jens; Seynnes, Olivier R

    2017-11-15

    The compliance of elastic elements allows muscles to dissipate energy safely during eccentric contractions. This buffering function is well documented in animal models but our understanding of its mechanism in humans is confined to non-specific tasks, requiring a subsequent acceleration of the body. The present study aimed to examine the behaviour of the human triceps surae muscle-tendon unit (MTU) during a pure energy dissipation task, under two loading conditions. Thirty-nine subjects performed a single-leg landing task, with and without added mass. Ultrasound measurements were combined with three-dimensional kinematics and kinetics to determine instantaneous length changes of MTUs, muscle fascicles, Achilles tendon and combined elastic elements. Gastrocnemius and soleus MTUs lengthened during landing. After a small concentric action, fascicles contracted eccentrically during most of the task, whereas plantar flexor muscles were activated. Combined elastic elements lengthened until peak ankle moment and recoiled thereafter, whereas no recoil was observed for the Achilles tendon. Adding mass resulted in greater negative work and MTU lengthening, which were accompanied by a greater stretch of tendon and elastic elements and a greater recruitment of the soleus muscle, without any further fascicle strain. Hence, the buffering action of elastic elements delimits the maximal strain and lengthening velocity of active muscle fascicles and is commensurate with loading constraints. In the present task, energy dissipation was modulated via greater MTU excursion and more forceful eccentric contractions. The distinct strain pattern of the Achilles tendon supports the notion that different elastic elements may not systematically fulfil the same function. © 2017. Published by The Company of Biologists Ltd.

  10. 78 FR 45001 - Self-Regulatory Organizations; Miami International Securities Exchange LLC; Order Approving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ... a minimum participation allocation of at least one (1) contract. Specifically, the proposal ensures that the DLMM will be allocated a minimum of one contract in situations where, due to the Exchange's... DLMM being allocated zero contracts. \\5\\ A ``Directed Order'' is an order entered into the System by an...

  11. 48 CFR 304.803-70 - Contract/order file organization and use of checklists.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contract/order file organization and use of checklists. 304.803-70 Section 304.803-70 Federal Acquisition Regulations System HEALTH... content of HHS contract and order files, OPDIVs shall use the folder filing system and accompanying file...

  12. 48 CFR 304.803-70 - Contract/order file organization and use of checklists.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract/order file organization and use of checklists. 304.803-70 Section 304.803-70 Federal Acquisition Regulations System HEALTH... content of HHS contract and order files, OPDIVs shall use the folder filing system and accompanying file...

  13. 48 CFR 304.803-70 - Contract/order file organization and use of checklists.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract/order file organization and use of checklists. 304.803-70 Section 304.803-70 Federal Acquisition Regulations System HEALTH... content of HHS contract and order files, OPDIVs shall use the folder filing system and accompanying file...

  14. 48 CFR 304.803-70 - Contract/order file organization and use of checklists.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contract/order file organization and use of checklists. 304.803-70 Section 304.803-70 Federal Acquisition Regulations System HEALTH... content of HHS contract and order files, OPDIVs shall use the folder filing system and accompanying file...

  15. 48 CFR 304.803-70 - Contract/order file organization and use of checklists.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Contract/order file organization and use of checklists. 304.803-70 Section 304.803-70 Federal Acquisition Regulations System HEALTH... content of HHS contract and order files, OPDIVs shall use the folder filing system and accompanying file...

  16. 76 FR 2170 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-12

    ... to market participants that add or remove liquidity from the Exchange (``maker/taker fees'') in 100... contract for Market Maker, Market Maker Plus,\\4\\ Firm Proprietary and Customer (Professional) \\5\\ orders... Customer \\7\\ orders for 100 or more contracts. Priority Customer orders for less than 100 contracts are not...

  17. 13 CFR 115.19 - Denial of liability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... under contract law, the Act, and the regulations in this part, SBA is relieved of liability if any of... guarantee application. (a) Excess Contract or bond amount. The total Contract or Order amount at the time of... exceeds the total Contract or Order amount. (b) Misrepresentation or fraud. The Surety obtained the Prior...

  18. Automatic intersection map generation task 10 report.

    DOT National Transportation Integrated Search

    2016-02-29

    This report describes the work conducted in Task 10 of the V2I Safety Applications Development Project. The work was performed by the University of Michigan Transportation Research Institute (UMTRI) under contract to the Crash Avoidance Metrics Partn...

  19. Fatigability and recovery of arm muscles with advanced age for dynamic and isometric contractions.

    PubMed

    Yoon, Tejin; Schlinder-Delap, Bonnie; Hunter, Sandra K

    2013-02-01

    This study determined whether age-related mechanisms can increase fatigue of arm muscles during maximal velocity dynamic contractions, as it occurs in the lower limb. We compared elbow flexor fatigue of young (n=10, 20.8±2.7 years) and old men (n=16, 73.8±6.1 years) during and in recovery from a dynamic and an isometric postural fatiguing task. Each task was maintained until failure while supporting a load equivalent to 20% of maximal voluntary isometric contraction (MVIC) torque. Transcranial magnetic stimulation (TMS) was used to assess supraspinal fatigue (superimposed twitch, SIT) and muscle relaxation. Time to failure was longer for the old men than for the young men for the isometric task (9.5±3.1 vs. 17.2±7.0 min, P=0.01) but similar for the dynamic task (6.3±2.4 min vs. 6.0±2.0 min, P=0.73). Initial peak rate of relaxation was slower for the old men than for the young men, and was associated with a longer time to failure for both tasks (P<0.05). Low initial power during elbow flexion was associated with the greatest difference (reduction) in time to failure between the isometric task and the dynamic task (r=-0.54, P=0.015). SIT declined after both fatigue tasks similarly with age, although the recovery of SIT was associated with MVIC recovery for the old (both sessions) but not for the young men. Biceps brachii and brachioradialis EMG activity (% MVIC) of the old men were greater than that of the young men during the dynamic fatiguing task (P<0.05), but were similar during the isometric task. Muscular mechanisms and greater relative muscle activity (EMG activity) explain the greater fatigue during the dynamic task for the old men compared with the young men in the elbow flexor muscles. Recovery of MVC torque however relies more on the recovery of supraspinal fatigue among the old men than among the young men. Copyright © 2012 Elsevier Inc. All rights reserved.

  20. Using Cognitive Task Analysis and Eye Tracking to Understand Imagery Analysis

    DTIC Science & Technology

    2006-01-01

    Using Cognitive Task Analysis and Eye Tracking to Understand Imagery Analysis Laura Kurland, Abigail Gertner, Tom Bartee, Michael Chisholm and...have used these to study the analysts search behavior in detail. 2 EXPERIMENT Using a Cognitive Task Analysis (CTA) framework for knowledge...TITLE AND SUBTITLE Using Cognitive Task Analysis and Eye Tracking to Understand Imagery Analysis 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

  1. 48 CFR 1852.209-71 - Limitation of future contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective offerors is invited to FAR Subpart 9.5—Organizational Conflicts of... performance of tasks pursuant to this contract, is required to develop specifications or statements or work...

  2. Procedures for Establishing a Contingency Managed Classroom.

    ERIC Educational Resources Information Center

    Westinghouse Learning Corp., Albuquerque, NM. Behavior Systems Div.

    This manual for classroom teachers is designed to teach the application of contingency contracting procedures in the typical instructional setting. A "contingency contract" is an agreement between teacher and student whereby the student, upon demonstration of specific task achievement, receives a reward: permission to participate in a "reinforcing…

  3. Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Vandenberg, N. R.; Ma, C. (Technical Monitor)

    2002-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract Nepal, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during high geodetic and astrometric VLBI evolved through several major changes. This report is divided into five sections that correspond to major task areas in the contract: A) Coordination rid Scheduling, B) Field System, CN Station Support, D) Analysis and Research and Development, and E) Computer Support.

  4. Effect of salbutamol on neuromuscular function in endurance athletes.

    PubMed

    Decorte, Nicolas; Bachasson, Damien; Guinot, Michel; Flore, Patrice; Levy, Patrick; Verges, Samuel; Wuyam, Bernard

    2013-10-01

    The potential ergogenic effects of therapeutic inhaled salbutamol doses in endurance athletes have been controversially discussed for decades. We hypothesized that salbutamol inhalation may increase peripheral muscle contractility, reduce fatigability, and improve force recovery after a localized exercise in endurance athletes. Eleven healthy, nonasthmatic male athletes with high aerobic capacities were recruited to be compared in a double-blinded, randomized crossover study of two dose levels of salbutamol (200 and 800 μg) and a placebo administered by inhalation before a quadriceps fatigue test. Subjects performed an incremental exercise protocol consisting in sets of 10 intermittent isometric contractions starting at 20% of maximum voluntary contraction (MVC) with 10% MVC increment until exhaustion. Femoral nerve magnetic stimulation was used during and after MVC to evaluate neuromuscular fatigue after each set, at task failure, and after 10 and 30 min of recovery. Initial MVC and evoked muscular responses were not modified with salbutamol (P > 0.05). The total number of submaximal contractions until task failure significantly differed between treatments (placebo, 72 ± 7; 200 µg, 78 ± 8; and 800 µg, 82 ± 7; P < 0.01). MVC and evoked muscular responses were similarly reduced with all treatments during the fatiguing task (all P > 0.05). Voluntary activation was unaffected by the fatiguing task and treatments (P > 0.05). Supratherapeutic inhaled doses of β2-agonists increased quadriceps endurance during an incremental and localized fatiguing task in healthy endurance-trained athletes without significant effect on neuromuscular fatigue. Further studies are needed to clarify the underlying mechanisms.

  5. Theoretical studies in interstellar cloud chemistry

    NASA Technical Reports Server (NTRS)

    Chiu, Y. T.; Prasad, S. S.

    1993-01-01

    This final report represents the completion of the three tasks under the purchase order no. SCPDE5620,1,2F. Chemical composition of gravitationally contracting, but otherwise quiescent, interstellar clouds and of interstellar clouds traversed by high velocity shocks, were modeled in a comprehensive manner that represents a significant progress in modeling these objects. The evolutionary chemical modeling, done under this NASA contract, represents a notable advance over the 'classical' fixed condition equilibrium models because the evolutionary models consider not only the chemical processes but also the dynamical processes by which the dark interstellar clouds may have assumed their present state. The shock calculations, being reported here, are important because they extend the limited chemical composition derivable from dynamical calculations for the total density and temperature structures behind the shock front. In order to be tractable, the dynamical calculations must severely simplify the chemistry. The present shock calculations take the shock profiles from the dynamical calculations and derive chemical composition in a comprehensive manner. The results of the present modeling study are still to be analyzed with reference to astronomical observational data and other contemporary model predictions. As far as humanly possible, this analysis will be continued with CRE's (Creative Research Enterprises's) IR&D resources, until a sponsor is found.

  6. Can stereotype threat affect motor performance in the absence of explicit monitoring processes? Evidence using a strength task.

    PubMed

    Chalabaev, Aïna; Brisswalter, Jeanick; Radel, Rémi; Coombes, Stephen A; Easthope, Christopher; Clément-Guillotin, Corentin

    2013-04-01

    Previous evidence shows that stereotype threat impairs complex motor skills through increased conscious monitoring of task performance. Given that one-step motor skills may not be susceptible to these processes, we examined whether performance on a simple strength task may be reduced under stereotype threat. Forty females and males performed maximum voluntary contractions under stereotypical or nullified-stereotype conditions. Results showed that the velocity of force production within the first milliseconds of the contraction decreased in females when the negative stereotype was induced, whereas maximal force did not change. In males, the stereotype induction only increased maximal force. These findings suggest that stereotype threat may impair motor skills in the absence of explicit monitoring processes, by influencing the planning stage of force production.

  7. Design, fabricate, and provide engineering support for radiosotope thermoelectric generators for NASA'S CRHF and CASSINI missions

    NASA Astrophysics Data System (ADS)

    The technical progress achieved during the period 11 January through 31 March 1991 on Contract DE-AC03-91SF18852.000 Radioisotope Thermoelectric Generators and ancillary activities is described. The system contract consists of the following tasks: (1) Spacecraft Integration and Liaison; (2) Engineering Support; (3) Safety; (4) Qualify Unicouple Fabrication; (5) ETG Fabrication, Assembly and Test; (6) GSE; (7) RTG Shipping and Launch Support; (8) Designs, Reviews, and Mission Applications; (9) Project Management, Quality Assurance and Reliability; and (10) CAGO Acquisition (Capital Funds). The progress achieved is broken down into these tasks.

  8. 48 CFR 3052.209-73 - Limitation of future contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determined that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective offerors is invited to FAR Subpart 9.5—Organizational Conflicts of... performance of tasks pursuant to this contract, is required to develop specifications or statements of work...

  9. 48 CFR 752.242-70 - Periodic progress reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... interpreted as “task order” or “delivery order” when this clause is used in an indefinite-delivery contract... may be used by USAID personnel or their authorized representatives when evaluating the contractor's... contracting officer may withhold from payment an amount not to exceed US$25,000 (or local currency equivalent...

  10. Analysis of film cooling in rocket nozzles

    NASA Technical Reports Server (NTRS)

    Woodbury, Keith A.

    1993-01-01

    This report summarizes the findings on the NASA contract NAG8-212, Task No. 3. The overall project consists of three tasks, all of which have been successfully completed. In addition, some supporting supplemental work, not required by the contract, has been performed and is documented herein. Task 1 involved the modification of the wall functions in the code FDNS (Finite Difference Navier-Stokes) to use a Reynolds Analogy-based method. This task was completed in August, 1992. Task 2 involved the verification of the code against experimentally available data. The data chosen for comparison was from an experiment involving the injection of helium from a wall jet. Results obtained in completing this task also show the sensitivity of the FDNS code to unknown conditions at the injection slot. This task was completed in September, 1992. Task 3 required the computation of the flow of hot exhaust gases through the P&W 40K subscale nozzle. Computations were performed both with and without film coolant injection. This task was completed in July, 1993. The FDNS program tends to overpredict heat fluxes, but, with suitable modeling of backside cooling, may give reasonable wall temperature predictions. For film cooling in the P&W 40K calorimeter subscale nozzle, the average wall temperature is reduced from 1750R to about 1050R by the film cooling. The average wall heat flux is reduced by a factor of 3.

  11. Special environmental control and life support equipment test analyses and hardware

    NASA Technical Reports Server (NTRS)

    Callahan, David M.

    1995-01-01

    This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

  12. Application of Cognitive Task Analysis in User Requirements and Prototype Design Presentation/Briefing

    DTIC Science & Technology

    2005-10-01

    AFRL-HE-WP-TP-2005-0030 AIR FORCE RESEARCH LABORATORY Application of Cognitive Task Analysis in User Requirements and Prototype Design Presentation...TITLE AND SUBTITLE 5a. CONTRACT NUMBER FA8650-04-C-6406 Application of Cognitive Task Analysis in User Requirements 5b.GRANTNUMBER and Prototype...maintainer experience 21 21 Questions & Answers Application of Cognitive Task Analysis in User Requirements Definition and Prototype Design Christopher Curtis

  13. 48 CFR 43.204 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 43.204 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 43.204 Administration. (a) Change order documentation. When change orders are not forward priced, they require two documents: the change order and a supplemental agreement...

  14. A Mobile, Map-Based Tasking Interface for Human-Robot Interaction

    DTIC Science & Technology

    2010-12-01

    A MOBILE, MAP-BASED TASKING INTERFACE FOR HUMAN-ROBOT INTERACTION By Eli R. Hooten Thesis Submitted to the Faculty of the Graduate School of...SUBTITLE A Mobile, Map-Based Tasking Interface for Human-Robot Interaction 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...3 II.1 Interactive Modalities and Multi-Touch . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 II.2

  15. 76 FR 53719 - Nondisplacement of Qualified Workers Under Service Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ...In this final rule, the Department of Labor (Department or DOL) issues final regulations to implement Executive Order 13495, Nondisplacement of Qualified Workers Under Service Contracts. The Executive Order establishes a general policy of the Federal Government concerning service contracts and solicitations for service contracts for performance of the same or similar services at the same location. This policy mandates the inclusion of a contract clause requiring the successor contractor and its subcontractors to offer those employees employed under the predecessor contract, whose employment will be otherwise terminated as a result of the award of the successor contract, a right of first refusal of employment under the successor contract in positions for which they are qualified.

  16. Digital contract approach for consistent and predictable multimedia information delivery in electronic commerce

    NASA Astrophysics Data System (ADS)

    Konana, Prabhudev; Gupta, Alok; Whinston, Andrew B.

    1997-01-01

    A pure 'technological' solution to network quality problems is incomplete since any benefits from new technologies are offset by the demand from exponentially growing electronic commerce ad data-intensive applications. SInce an economic paradigm is implicit in electronic commerce, we propose a 'market-system' approach to improve quality of service. Quality of service for digital products takes on a different meaning since users view quality of service differently and value information differently. We propose a framework for electronic commerce that is based on an economic paradigm and mass-customization, and works as a wide-area distributed management system. In our framework, surrogate-servers act as intermediaries between information provides and end- users, and arrange for consistent and predictable information delivery through 'digital contracts.' These contracts are negotiated and priced based on economic principles. Surrogate servers pre-fetched, through replication, information from many different servers and consolidate based on demand expectations. In order to recognize users' requirements and process requests accordingly, real-time databases are central to our framework. We also propose that multimedia information be separated into slowly changing and rapidly changing data streams to improve response time requirements. Surrogate- servers perform the tasks of integration of these data streams that is transparent to end-users.

  17. 48 CFR 243.204-70-7 - Plans and reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced management and oversight of unpriced change orders, departments and agencies shall— (a) Include in the Consolidated Undefinitized Contract Action (UCA) Management...

  18. 48 CFR 243.205-72 - Unpriced change orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205-72 Unpriced change orders. See the clause prescriptions at 217.7406 for all unpriced change orders with an... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Unpriced change orders...

  19. 48 CFR 243.205-72 - Unpriced change orders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205-72 Unpriced change orders. See the clause prescriptions at 217.7406 for all unpriced change orders with an... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Unpriced change orders...

  20. Rate modulation of human anconeus motor units during high-intensity dynamic elbow extensions.

    PubMed

    Cowling, Brianna L; Harwood, Brad; Copithorne, David B; Rice, Charles L

    2016-08-01

    Investigations of high-intensity isometric fatiguing protocols report decreases in motor unit firing rates (MUFRs), but little is known regarding changes in MUFRs following fatigue induced by high-intensity dynamic contractions. Our purpose was to evaluate MUFRs of the anconeus (an accessory elbow extensor) and elbow extension power production as a function of time to task failure (TTF) during high-velocity fatiguing concentric contractions against a moderately heavy resistance. Fine-wire intramuscular electrode pairs were inserted into the anconeus to record MUs in 12 male participants (25 ± 3 yr), over repeated sessions on separate days. MUs were tracked throughout a three-stage, varying load dynamic elbow extension protocol designed to extend the task duration for >1 min thereby inducing substantial fatigue. Mean MUFRs and peak power were calculated for three relative time ranges: 0-15% TTF (beginning), 45-60% TTF (middle) and 85-100% TTF (end). Mean duration of the overall fatigue protocol was ∼80 s. Following the protocol, isometric maximum voluntary contraction (MVC), highest velocity at 35% MVC load, and peak power decreased 37, 60, and 64% compared with baseline, respectively. Data from 20 anconeus MUs tracked successfully throughout the protocol indicated a reduction in MUFRs in relation to power loss from 36 Hz/160 W (0-15% TTF) to 28 Hz/97 W (45-60% TTF) to 23 Hz/43 W (85-100% TTF). During these high-intensity maximal effort concentric contractions, anconeus MUFRs decreased substantially (>35%). Although the absolute MUFRs were higher in the present study than those reported previously for other muscles during sustained high-intensity isometric tasks, the relative decrease in MUFRs was similar between the two tasks. Copyright © 2016 the American Physiological Society.

  1. 13 CFR 305.13 - Contract change orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contract change orders. 305.13 Section 305.13 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.13 Contract...

  2. 48 CFR 43.203 - Change order accounting procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Change order accounting... CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 43.203 Change order accounting procedures. (a) Contractors' accounting systems are seldom designed to segregate the costs of performing changed work...

  3. Job Order Contracting: A Procurement Success Story

    DTIC Science & Technology

    1988-02-01

    Engineering/Procurement processing time 279 CI4 TABLE C-2 JOC DELIVERY ORDER PROCESSING TIME Contract size and location Amount Elapsed time- ($000) days...Bragg 2.1 68 Monroe 2.1 196 Sill 2.2 3 bragg 2.3 32 C-5 Ii ~A¶A~.AL&A .LiA..hLI TABLE C-2 JOC DELIVERY ORDER PROCESSING TIME (Continued) Conrat szean...DEUVERY ORDER PROCESSING TIME (Continued) Amount Elapsed time- Contract size and location Amou daps($000) days Bragg S 14.7 11 Monroe 14.8 30 Monroe

  4. Northern Cheyenne Follow Through Project. Lame Deer, Montana 59043.

    ERIC Educational Resources Information Center

    Montana State Dept. of Public Instruction, Helena.

    Focusing on the basic skills of reading, math, and handwriting, the Northern Cheyenne Follow Through Project utilizes six concepts. First, token delivery of contract system for motivation involves having the child earn tokens or work on a contract as he accomplishes tasks in specific skills. During the spend period, he may trade for desired…

  5. On-line Robot Adaptation to Environmental Change

    DTIC Science & Technology

    2005-08-01

    by the Department of the Interior under contract no. NBCH1040007, the US Army under contract no. DABT639910013, the US Air Force Research Laboratory...Probable Series Predictor algorithm. . . . . . . . . . . . . . . . . . . . . . . . . . 97 5.2 Accuracy of PSC in various test classification tasks...105 6.1 Probable Series Predictor algorithm. . . . . . . . . . . . . . . . . . . . . . . . . . 123 6.2 Accuracy of PSC in

  6. How Students Manage the Didactic Contract? Contribution of the Didactic Perspective to Research in Physical Education Classroom.

    ERIC Educational Resources Information Center

    Amade-Escot, Chantal

    This study investigated how and why students modified instructional tasks, explaining modifications using the concept of didactic contract. The study focused on two theoretical perspectives in physical education (PE) research: didactic and ecological. The didactic paradigm examines relationships among teachers, students, and the content embedded…

  7. Influence of Emotion on the Control of Low-Level Force Production

    ERIC Educational Resources Information Center

    Naugle, Kelly M.; Coombes, Stephen A.; Cauraugh, James H.; Janelle, Christopher M.

    2012-01-01

    The accuracy and variability of a sustained low-level force contraction (2% of maximum voluntary contraction) was measured while participants viewed unpleasant, pleasant, and neutral images during a feedback occluded force control task. Exposure to pleasant and unpleasant images led to a relative increase in force production but did not alter the…

  8. Does Government Funding Alter Nonprofit Governance? Evidence from New York City Nonprofit Contractors

    ERIC Educational Resources Information Center

    O'Regan, Katherine; Oster, Sharon

    2002-01-01

    Government contracting has raised a collection of issues with respect to adequate oversight and accountability. This paper explores one avenue through which contracting agencies may achieve these tasks: through the governance practices of the contractor's board. Oversight and monitoring are a board's key responsibilities, and influencing a board's…

  9. Jazzing up the Psychological Contract

    ERIC Educational Resources Information Center

    Hartley, Nell Tabor

    2010-01-01

    Helping students and practitioners to understand and utilize the Psychological Contract is often a difficult task. Unlike fault-finding research, this paper presents the PC as a positive, vibrant and valuable tool. In an effort to make the concept less elusive, the paper draws upon the metaphor of jazz. The metaphor is an accepted tool of…

  10. Data Acquisition System(DAS) Sustaining Engineering

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This paper presents general information describing the Data Acquisition System contract, a summary of objectives, tasks performed and completed. The hardware deliverables which are comprised of: 1) Two ground DAS units; 2) Two flight DAS units; 3) Logistic spares; and 4) Shipping containers are described. Also included are the data requirements and scope of the contract.

  11. [Evaluation of occupational medicine service tasks in the context of the Occupational Medicine Service Act, article 12, on the basis of statistical indicators in the Pomorskie voivodship].

    PubMed

    Parszuto, Jacek; Jaremin, Bogdan; Tukalska-Parszuto, Maria

    2009-01-01

    Occupational health service is based on legal regulations. We have made an attempt to estimate the implementation of the tasks resulting from article 12 of the Occupational Medicine Service Act introduced in 1998. In this paper we analyzed statistical data concerning the number of prophylactic health contracts, economic entities and health insurance payers. The data come from the Nofer Institute of Occupational Medicine, Central Statistical Office and Social Insurance Institution. Contract Coverage Rate (CCR) has been introduced for the purpose of this research. The data show that in 2007, the Contract Coverage Rate (CCR) for the Pomorskie voivodeship (province) accounted for 45.7%, with the median value of 14.4% for all voivodeships in Poland. According to the gathered statistical data, it should be concluded that the implementation of article 12 is insufficient. The amendment to the Act introducing the provision on written contracts is an opportunity to provide an effective mechanism, by which the present situation can be improved and the rates raised to a satisfactory level.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monroy, G.J. Keene, F.E.

    A study to address Ambos (Both) Nogales' air quality concerns was conducted by the Arizona Department of Environmental Quality (ADEQ), in conjunction with Mexico's Secretaria de Medio Ambiente, Recursos Naturales y Pesca (SEMARNAP), from 1994 to 1998. The study, which is part of the US-Mexico Border XXI Program, consisted of the following tasks: (1) air sampling/monitoring; (2) emissions inventory; (3) meteorological modeling; and, (4) health risk assessment. The following types of samples were collected: particulate matter (PM); volatile organic compounds; semi-volatile organic compounds; and aldehydes. All samples were collected for a 24-hour period; every sixth day during the warm monthsmore » (April--September), and every third day during the cold months (October--March). There were a total of six sampling stations; three on each side of the border. PM samples were collected at all six sites, while samples for Hazardous Air Pollutants (HAPs) were collected at four of those sites. Sample analyses were performed at the Desert Research Institute (DRI) in Reno, Nevada. Furthermore, four of the sites were outfitted with meteorological equipment, in order to gather data on wind speed and direction. PM and meteorological data are still being collected at two sampling sites, one in Arizona and one in Sonora. An emissions inventory of point, mobile and area sources for the Ambos Nogales area (12 x 19 km. domain), was developed following completion of the sampling effort. In order to accomplish this task, ADEQ contracted the services of RADIAN International and Powers Engineering; which in turn enlisted the services of Heuristica Ambiental of Hermosillo, Sonora. This task was completed in July, 1997. Vehicular emissions were found to be one of the main contributors of air emissions in the Ambos Nogales area. The third task of this project consisted developing meteorological models of the study area.« less

  13. 48 CFR 243.204-70 - Definitization of change orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70 Definitization of change orders. ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Definitization of change...

  14. 48 CFR 1913.505-2 - Board order forms in lieu of Optional and Standard Forms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... BROADCASTING BOARD OF GOVERNORS CONTRACTING METHODS AND CONTRACT TYPES SMALL PURCHASES AND OTHER SIMPLIFIED...-case basis, in order to accommodate computer-generated purchase order forms. Exception approval for...

  15. 48 CFR 1913.505-2 - Board order forms in lieu of Optional and Standard Forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BROADCASTING BOARD OF GOVERNORS CONTRACTING METHODS AND CONTRACT TYPES SMALL PURCHASES AND OTHER SIMPLIFIED...-case basis, in order to accommodate computer-generated purchase order forms. Exception approval for...

  16. 48 CFR 243.204-70 - Definitization of change orders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70 Definitization of change orders. ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Definitization of change...

  17. 48 CFR 543.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 543.205 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 543.205 Contract clauses. The contracting officer shall insert 552.243-71, Equitable Adjustments, in solicitations and contracts containing FAR 52.243-4, Changes. [74 FR...

  18. 48 CFR 543.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 543.205 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 543.205 Contract clauses. The contracting officer shall insert 552.243-71, Equitable Adjustments, in solicitations and contracts containing FAR 52.243-4, Changes. [74 FR...

  19. Distributed Processing System for Restoration of Electric Power Distribution Network Using Two-Layered Contract Net Protocol

    NASA Astrophysics Data System (ADS)

    Kodama, Yu; Hamagami, Tomoki

    Distributed processing system for restoration of electric power distribution network using two-layered CNP is proposed. The goal of this study is to develop the restoration system which adjusts to the future power network with distributed generators. The state of the art of this study is that the two-layered CNP is applied for the distributed computing environment in practical use. The two-layered CNP has two classes of agents, named field agent and operating agent in the network. In order to avoid conflicts of tasks, operating agent controls privilege for managers to send the task announcement messages in CNP. This technique realizes the coordination between agents which work asynchronously in parallel with others. Moreover, this study implements the distributed processing system using a de-fact standard multi-agent framework, JADE(Java Agent DEvelopment framework). This study conducts the simulation experiments of power distribution network restoration and compares the proposed system with the previous system. We confirmed the results show effectiveness of the proposed system.

  20. Stressor-induced increase in muscle fatigability of young men and women is predicted by strength but not voluntary activation

    PubMed Central

    Pereira, Hugo M.; Pruse, Jaclyn; Yoon, Tejin; Schlinder-DeLap, Bonnie; Nielson, Kristy A.; Hunter, Sandra K.

    2014-01-01

    This study investigated mechanisms for the stressor-induced changes in muscle fatigability in men and women. Participants performed an isometric-fatiguing contraction at 20% maximal voluntary contraction (MVC) until failure with the elbow flexor muscles. Study one (n = 55; 29 women) involved two experimental sessions: 1) a high-stressor session that required a difficult mental-math task before and during a fatiguing contraction and 2) a control session with no mental math. For some participants (n = 28; 14 women), cortical stimulation was used to examine mechanisms that contributed to muscle fatigability during the high-stressor and control sessions. Study two (n = 23; nine women) determined the influence of a low stressor, i.e., a simple mental-math task, on muscle fatigability. In study one, the time-to-task failure was less for the high-stressor session than control (P < 0.05) for women (19.4%) and men (9.5%): the sex difference response disappeared when covaried for initial strength (MVC). MVC force, voluntary activation, and peak-twitch amplitude decreased similarly for the control and high-stressor sessions (P < 0.05). In study two, the time-to-task failure of men or women was not influenced by the low stressor (P > 0.05). The greater fatigability, when exposed to a high stressor during a low-force task, was not exclusive to women but involved a strength-related mechanism in both weaker men and women that accelerated declines in voluntary activation and slowing of contractile properties. PMID:24526582

  1. 48 CFR 43.202 - Authority to issue change orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Authority to issue change orders. 43.202 Section 43.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 43.202 Authority to issue change orders. Change...

  2. 48 CFR 43.202 - Authority to issue change orders.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Authority to issue change orders. 43.202 Section 43.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 43.202 Authority to issue change orders. Change...

  3. Automated detection and classification of dice

    NASA Astrophysics Data System (ADS)

    Correia, Bento A. B.; Silva, Jeronimo A.; Carvalho, Fernando D.; Guilherme, Rui; Rodrigues, Fernando C.; de Silva Ferreira, Antonio M.

    1995-03-01

    This paper describes a typical machine vision system in an unusual application, the automated visual inspection of a Casino's playing tables. The SORTE computer vision system was developed at INETI under a contract with the Portuguese Gaming Inspection Authorities IGJ. It aims to automate the tasks of detection and classification of the dice's scores on the playing tables of the game `Banca Francesa' (which means French Banking) in Casinos. The system is based on the on-line analysis of the images captured by a monochrome CCD camera placed over the playing tables, in order to extract relevant information concerning the score indicated by the dice. Image processing algorithms for real time automatic throwing detection and dice classification were developed and implemented.

  4. Advanced water window x-ray microscope design and analysis

    NASA Technical Reports Server (NTRS)

    Shealy, D. L.; Wang, C.; Jiang, W.; Lin, J.

    1992-01-01

    The project was focused on the design and analysis of an advanced water window soft-x-ray microscope. The activities were accomplished by completing three tasks contained in the statement of work of this contract. The new results confirm that in order to achieve resolutions greater than three times the wavelength of the incident radiation, it will be necessary to use aspherical mirror surfaces and to use graded multilayer coatings on the secondary (to accommodate the large variations of the angle of incidence over the secondary when operating the microscope at numerical apertures of 0.35 or greater). The results are included in a manuscript which is enclosed in the Appendix.

  5. Discharge properties of abductor hallucis before, during, and after an isometric fatigue task.

    PubMed

    Kelly, Luke A; Racinais, Sebastien; Cresswell, Andrew G

    2013-08-01

    Abductor hallucis is the largest muscle in the arch of the human foot and comprises few motor units relative to its physiological cross-sectional area. It has been described as a postural muscle, aiding in the stabilization of the longitudinal arch during stance and gait. The purpose of this study was to describe the discharge properties of abductor hallucis motor units during ramp and hold isometric contractions, as well as its discharge characteristics during fatigue. Intramuscular electromyographic recordings from abductor hallucis were made in 5 subjects; from those recordings, 42 single motor units were decomposed. Data were recorded during isometric ramp contractions at 60% maximum voluntary contraction (MVC), performed before and after a submaximal isometric contraction to failure (mean force 41.3 ± 15.3% MVC, mean duration 233 ± 116 s). Motor unit recruitment thresholds ranged from 10.3 to 54.2% MVC. No significant difference was observed between recruitment and derecruitment thresholds or their respective discharge rates for both the initial and postfatigue ramp contractions (all P > 0.25). Recruitment threshold was positively correlated with recruitment discharge rate (r = 0.47, P < 0.03). All motor units attained similar peak discharge rates (14.0 ± 0.25 pulses/s) and were not correlated with recruitment threshold. Thirteen motor units could be followed during the isometric fatigue task, with a decline in discharge rate and increase in discharge rate variability occurring in the final 25% of the task (both P < 0.05). We have shown that abductor hallucis motor units discharge relatively slowly and are considerably resistant to fatigue. These characteristics may be effective for generating and sustaining the substantial level of force that is required to stabilize the longitudinal arch during weight bearing.

  6. Contract Attorneys Course Deskbook. Volume 2

    DTIC Science & Technology

    2007-06-21

    Fed. Cir. 1994) (upholding the contractor’s submission of a subcontractor’s claim pursuant to a court order). 24-16 d. No claim vs . Defective...Non-DOD contract vehicles (orders placed by DOD and contracts awarded or orders placed by non-DOD entities on behalf of DOD, including franchise ...the federal agencies concerning who took what rights in a patent. Some agencies took title to the patent, while others left ownership with the

  7. Comparison between maximal lengthening and shortening contractions for biceps brachii muscle oxygenation and hemodynamics.

    PubMed

    Muthalib, Makii; Lee, Hoseong; Millet, Guillaume Y; Ferrari, Marco; Nosaka, Kazunori

    2010-09-01

    Eccentric contractions (ECC) require lower systemic oxygen (O2) and induce greater symptoms of muscle damage than concentric contractions (CON); however, it is not known if local muscle oxygenation is lower in ECC than CON during and following exercise. This study compared between ECC and CON for changes in biceps brachii muscle oxygenation [tissue oxygenation index (TOI)] and hemodynamics [total hemoglobin volume (tHb)=oxygenated-Hb+deoxygenated-Hb], determined by near-infrared spectroscopy over 10 sets of 6 maximal contractions of the elbow flexors of 10 healthy subjects. This study also compared between ECC and CON for changes in TOI and tHb during a 10-s sustained and 30-repeated maximal isometric contraction (MVC) task measured immediately before and after and 1-3 days following exercise. The torque integral during ECC was greater (P<0.05) than that during CON by approximately 30%, and the decrease in TOI was smaller (P<0.05) by approximately 50% during ECC than CON. Increases in tHb during the relaxation phases were smaller (P<0.05) by approximately 100% for ECC than CON; however, the decreases in tHb during the contraction phases were not significantly different between sessions. These results suggest that ECC utilizes a lower muscle O2 relative to O2 supply compared with CON. Following exercise, greater (P<0.05) decreases in MVC strength and increases in plasma creatine kinase activity and muscle soreness were evident 1-3 days after ECC than CON. Torque integral, TOI, and tHb during the sustained and repeated MVC tasks decreased (P<0.01) only after ECC, suggesting that muscle O2 demand relative to O2 supply during the isometric tasks was decreased after ECC. This could mainly be due to a lower maximal muscle mass activated as a consequence of muscle damage; however, an increase in O2 supply due to microcirculation dysfunction and/or inflammatory vasodilatory responses after ECC is recognized.

  8. Medical Assisting Learning Guides.

    ERIC Educational Resources Information Center

    Meyer, Rose

    Eight student learning guides are provided for a medical assisting program at the secondary, postsecondary, or adult level. Each learning guide is composed of these component parts: a title page that states the task, purpose, program and task numbers, estimated time, and prerequisites; an optional learning contract that includes terminal…

  9. Engine Validation of Noise and Emission Reduction Technology Phase I

    NASA Technical Reports Server (NTRS)

    Weir, Don (Editor)

    2008-01-01

    This final report has been prepared by Honeywell Aerospace, Phoenix, Arizona, a unit of Honeywell International, Inc., documenting work performed during the period December 2004 through August 2007 for the NASA Glenn Research Center, Cleveland, Ohio, under the Revolutionary Aero-Space Engine Research (RASER) Program, Contract No. NAS3-01136, Task Order 8, Engine Validation of Noise and Emission Reduction Technology Phase I. The NASA Task Manager was Dr. Joe Grady of the NASA Glenn Research Center. The NASA Contract Officer was Mr. Albert Spence of the NASA Glenn Research Center. This report is for a test program in which NASA funded engine validations of integrated technologies that reduce aircraft engine noise. These technologies address the reduction of engine fan and jet noise, and noise associated with propulsion/airframe integration. The results of these tests will be used by NASA to identify the engineering tradeoffs associated with the technologies that are needed to enable advanced engine systems to meet stringent goals for the reduction of noise. The objectives of this program are to (1) conduct system engineering and integration efforts to define the engine test-bed configuration; (2) develop selected noise reduction technologies to a technical maturity sufficient to enable engine testing and validation of those technologies in the FY06-07 time frame; (3) conduct engine tests designed to gain insight into the sources, mechanisms and characteristics of noise in the engines; and (4) establish baseline engine noise measurements for subsequent use in the evaluation of noise reduction.

  10. 41 CFR 51-6.1 - Direct order process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Direct order process. 51-6.1 Section 51-6.1 Public Contracts and Property Management Other Provisions Relating to Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 6-PROCUREMENT PROCEDURES...

  11. 41 CFR 51-3.4 - Distribution of orders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Distribution of orders. 51-3.4 Section 51-3.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED 3-CENTRAL NONPROFIT AGENCIES...

  12. Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress

    DTIC Science & Technology

    2004-10-28

    NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Defense Acquisition University David D. Acker Library...program, it had decided to award the contract for the next phase on a sole-source basis to NGSS . The Navy has also stated that “The ship construction...contracts will be allocated equally between NGSS and BIW for the first six ships... and will be Cost Plus Incentive Fee (CPIF) type contracts.... The

  13. NASA Extends Chandra Science and Operations Support Contract

    NASA Astrophysics Data System (ADS)

    2010-01-01

    NASA has extended a contract with the Smithsonian Astrophysical Observatory in Cambridge, Mass., to provide science and operational support for the Chandra X-ray Observatory, a powerful tool used to better understand the structure and evolution of the universe. The contract extension with the Smithsonian Astrophysical Observatory provides continued science and operations support to Chandra. This approximately 172 million modification brings the total value of the contract to approximately 545 million for the base effort. The base effort period of performance will continue through Sept. 30, 2013, except for the work associated with the administration of scientific research grants, which will extend through Feb. 28, 2016. The contract type is cost reimbursement with no fee. In addition to the base effort, the contract includes two options for three years each to extend the period of performance for an additional six years. Option 1 is priced at approximately 177 million and Option 2 at approximately 191 million, for a total possible contract value of about $913 million. The contract covers mission operations and data analysis, which includes observatory operations, science data processing and astronomer support. The operations tasks include monitoring the health and status of the observatory and developing and uplinking the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning and coordination of science observations and processing and delivery of the resulting scientific data. NASA's Marshall Space Flight Center in Huntsville, Ala, manages the Chandra program for the agency's Science Mission Directorate in Washington. The Smithsonian Astrophysical Observatory controls Chandra's science and flight operations. For more information about the Chandra X-ray Observatory visit: http://chandra.nasa.gov

  14. Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators

    DTIC Science & Technology

    2017-07-07

    AFRL-RH-FS-TR-2017-0026 Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators Thomas K. Kuyk Peter A. Smith Solangia...34Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators" (AFRL-RH-FS-TR- 2017 - 0026 SHORTER.PATRI CK.D.1023156390 Digitally...SUBTITLE Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators 5a. CONTRACT NUMBER FA8650-14-D-6519 5b. GRANT NUMBER 5c

  15. Goddard High Resolution Spectrograph SV/GTO Project

    NASA Technical Reports Server (NTRS)

    Ebbets, Dennis

    1999-01-01

    Contract number NAS5-30433, known at Ball Aerospace as the GHRS SV/GTO project, supported our participation in the post-launch activities of the Goddard High Resolution Spectrograph aboard the Hubble Space Telescope. The period of performance was December 1988 through December 1998. The contract supported the involvement of Dr Dennis Ebbets in the work of the GHRS Investigation Definition Team, and several of the Ball people in the documentation and publication of results. Three main categories of tasks were covered by this contract; in-orbit calibration of the GHRS, guaranteed time observations, and education and public outreach. The nature and accomplishments of these tasks are described in the report. This summary makes many references to publications in the scientific and technical literature. Appendix A is extracted from a complete bibliography, and lists those papers that are directly related to work performed under this GHRS contract. The tasks related to the in-orbit calibration of the GHRS were by far the largest responsibility during the first six years of the project. During this period Dr. Ebbets was responsible for the definition of calibration requirements, design of experiments, preparation of observing proposals, tracking their implementation and execution, and coordinating the analysis and publication of the results. Prior to the launch of HST in 1990 the observing proposals were developed in cooperation with the scientists on the GHRS DDT, engineers at Ball Aerospace, the operations staff at the STScI, and project coordinators at GSFC.

  16. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  17. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  18. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  19. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  20. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  1. 46 CFR Sec. 7 - Job order numbering.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Job order numbering. Sec. 7 Section 7 Shipping MARITIME... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 7 Job order numbering. (a) The NSA-LUMPSUMREP Contract number shall be inserted in every job order and supplemental job...

  2. 46 CFR Sec. 7 - Job order numbering.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Job order numbering. Sec. 7 Section 7 Shipping MARITIME... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 7 Job order numbering. (a) The NSA-LUMPSUMREP Contract number shall be inserted in every job order and supplemental job...

  3. 46 CFR Sec. 7 - Job order numbering.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Job order numbering. Sec. 7 Section 7 Shipping MARITIME... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 7 Job order numbering. (a) The NSA-LUMPSUMREP Contract number shall be inserted in every job order and supplemental job...

  4. 46 CFR Sec. 7 - Job order numbering.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Job order numbering. Sec. 7 Section 7 Shipping MARITIME... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 7 Job order numbering. (a) The NSA-LUMPSUMREP Contract number shall be inserted in every job order and supplemental job...

  5. 46 CFR Sec. 7 - Job order numbering.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Job order numbering. Sec. 7 Section 7 Shipping MARITIME... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 7 Job order numbering. (a) The NSA-LUMPSUMREP Contract number shall be inserted in every job order and supplemental job...

  6. 48 CFR 52.243-6 - Change Order Accounting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Change Order Accounting....243-6 Change Order Accounting. As prescribed in 43.205(f), the contracting officer may insert a clause, substantially the same as follows: Change Order Accounting (APR 1984) The Contracting Officer may require change...

  7. Evaluating the Ergonomics of Flexible Ureteroscopy.

    PubMed

    Ludwig, Wesley W; Lee, Gyusung; Ziemba, Justin B; Ko, Joan S; Matlaga, Brian R

    2017-10-01

    To date, the ergonomics of flexible ureteroscopy (URS) have not been well described. We performed a study to assess the biomechanical stresses on urologists performing URS and to investigate the effect of ureteroscope type on these parameters. Electromyography (EMG) was used to quantify the activation level of muscle groups involved in URS. Surface EMG electrodes (Delsys, Boston, MA) were placed on the right and left thenar, flexor carpi ulnaris (FCU), extensor carpi ulnaris (ECU), biceps, triceps, and deltoid. Three endoscopes were studied: single-use digital (Boston Scientific LithoVue), reusable digital (Karl Storz Flex-X c ), and reusable fiber-optic (Karl Storz Flex-X 2 ). Each ureteroscope was used to perform a set sequence of navigation and procedural tasks in a training model. EMG data were processed and normalized to compare the maximum voluntary contractions between muscle groups. Cumulative muscular workload (CMW) and average muscular work per second (AWS) were used for comparative analysis. For navigational tasks, CMW and AWS were greatest for the ECU, followed in descending order by right and left thenar, FCU, biceps, deltoid, and triceps. For procedural tasks, CMW and AWS were greatest for the right thenar, followed in descending order by the left thenar, ECU, FCU, triceps, biceps, and deltoid. During navigational tasks, both LithoVue and Flex-X c had lower CMWs for every muscle group than Flex-X 2 (p < 0.05). LithoVue and Flex-X c had similar AWS and both were lower than Flex-X 2 for the right thenar, ECU, biceps, and deltoid activation (p < 0.05). During procedural tasks, both LithoVue and Flex-X c had lower CMWs and AWS for right and left thenar, ECU, and biceps than Flex-X 2 (p < 0.05). This study provides the first description of EMG-measured ergonomics of URS. Both the single-use and reusable digital ureteroscopes have similar profiles, and both have significantly better ergonomic metrics than the reusable fiber-optic ureteroscope.

  8. Concepts and Methods of Explicit Marital Negotiation Training with the Marriage Contract Game.

    ERIC Educational Resources Information Center

    Blechman, Elaine A.; Rabin, Claire

    1982-01-01

    Describes the Marriage Contract Game, designed to help couples negotiate relationship and task problems in an explicit, rational manner. Discusses the game's conceptual ties to modes of behavioral family intervention and to the social psychology of bargaining. Concludes with an example of the game's application to a distressed couple. (Author/JAC)

  9. 48 CFR 243.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clauses. 243.205 Section 243.205 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205 Contract clauses. ...

  10. 48 CFR 243.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contract clauses. 243.205 Section 243.205 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205 Contract clauses. ...

  11. FDNS code to predict wall heat fluxes or wall temperatures in rocket nozzles

    NASA Technical Reports Server (NTRS)

    Karr, Gerald R.

    1993-01-01

    This report summarizes the findings on the NASA contract NAG8-212, Task No. 3. The overall project consists of three tasks, all of which have been successfully completed. In addition, some supporting supplemental work, not required by the contract, has been performed and is documented herein. Task 1 involved the modification of the wall functions in the code FDNS to use a Reynolds Analogy-based method. Task 2 involved the verification of the code against experimentally available data. The data chosen for comparison was from an experiment involving the injection of helium from a wall jet. Results obtained in completing this task also show the sensitivity of the FDNS code to unknown conditions at the injection slot. Task 3 required computation of the flow of hot exhaust gases through the P&W 40K subscale nozzle. Computations were performed both with and without film coolant injection. The FDNS program tends to overpredict heat fluxes, but, with suitable modeling of backside cooling, may give reasonable wall temperature predictions. For film cooling in the P&W 40K calorimeter subscale nozzle, the average wall temperature is reduced from 1750 R to about 1050 R by the film cooling. The average wall heat flux is reduced by a factor of three.

  12. 46 CFR Sec. 3 - General provisions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... thereof or if the contractor does not hold a Master Repair Contract under NSA-WORKSMALREP if the contract price does not exceed $2,000 and said contract is made in accordance with NSA Order 46 (SRM-5, Revised) and NSA Order 51 (SRM-6, Revised). (b) The repairs to or servicing of ships equipment, as covered by...

  13. 46 CFR Sec. 3 - General provisions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... thereof or if the contractor does not hold a Master Repair Contract under NSA-WORKSMALREP if the contract price does not exceed $2,000 and said contract is made in accordance with NSA Order 46 (SRM-5, Revised) and NSA Order 51 (SRM-6, Revised). (b) The repairs to or servicing of ships equipment, as covered by...

  14. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  15. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  16. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  17. 48 CFR 337.103-70 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Child Abuse, in solicitations, contracts, and orders that require performance on Federal land or in a... clause in 352.237-70, Pro-Children Act, in solicitations, contracts, and orders that involve (a... provided to children under the age of 18 on a routine or regular basis pursuant to the Pro-Children Act of...

  18. Application of adaptive antenna techniques to future commercial satellite communication

    NASA Technical Reports Server (NTRS)

    Ersoy, L.; Lee, E. A.; Matthews, E. W.

    1987-01-01

    The purpose of this contract was to identify the application of adaptive antenna technique in future operational commercial satellite communication systems and to quantify potential benefits. The contract consisted of two major subtasks. Task 1, Assessment of Future Commercial Satellite System Requirements, was generally referred to as the Adaptive section. Task 2 dealt with Pointing Error Compensation Study for a Multiple Scanning/Fixed Spot Beam Reflector Antenna System and was referred to as the reconfigurable system. Each of these tasks was further sub-divided into smaller subtasks. It should also be noted that the reconfigurable system is usually defined as an open-loop system while the adaptive system is a closed-loop system. The differences between the open- and closed-loop systems were defined. Both the adaptive and reconfigurable systems were explained and the potential applications of such systems were presented in the context of commercial communication satellite systems.

  19. Application of adaptive antenna techniques to future commercial satellite communications. Executive summary

    NASA Technical Reports Server (NTRS)

    Ersoy, L.; Lee, E. A.; Matthews, E. W.

    1987-01-01

    The purpose of this contract was to identify the application of adaptive antenna technique in future operational commercial satellite communication systems and to quantify potential benefits. The contract consisted of two major subtasks. Task 1, Assessment of Future Commercial Satellite System Requirements, was generally referred to as the Adaptive section. Task 2 dealt with Pointing Error Compensation Study for a Multiple Scanning/Fixed Spot Beam Reflector Antenna System and was referred to as the reconfigurable system. Each of these tasks was further subdivided into smaller subtasks. It should also be noted that the reconfigurable system is usually defined as an open-loop system while the adaptive system is a closed-loop system. The differences between the open- and closed-loop systems were defined. Both the adaptive and reconfigurable systems were explained and the potential applications of such systems were presented in the context of commercial communication satellite systems.

  20. Effective Team Support: From Modeling to Software Agents

    NASA Technical Reports Server (NTRS)

    Remington, Roger W. (Technical Monitor); John, Bonnie; Sycara, Katia

    2003-01-01

    The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and engineers and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in modeling infrastructure and task infrastructure. Work is continuing under a different contract to complete empirical data collection, cognitive modeling, and the building of software agents to support the teams task.

  1. Examining the relationship between endogenous pain modulation capacity and endurance exercise performance.

    PubMed

    Flood, Andrew; Waddington, Gordon; Cathcart, Stuart

    2017-01-01

    The aim of the current study was to examine the relationship between pain modulatory capacity and endurance exercise performance. Twenty-seven recreationally active males between 18 and 35 years of age participated in the study. Pain modulation was assessed by examining the inhibitory effect of a noxious conditioning stimulus (cuff occlusion) on the perceived intensity of a second noxious stimulus (pressure pain threshold). Participants completed two, maximal voluntary contractions followed by a submaximal endurance time task. Both performance tasks involved an isometric contraction of the non-dominant leg. The main analysis uncovered a correlation between pain modulatory capacity and performance on the endurance time task (r = -.425, p = .027), such that those with elevated pain modulation produced longer endurance times. These findings are the first to demonstrate the relationship between pain modulation responses and endurance exercise performance.

  2. 48 CFR 1313.302 - Purchase orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Purchase orders. 1313.302 Section 1313.302 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Simplified Acquisitions Methods 1313.302 Purchase orders. ...

  3. Effect of a worktable position on head and shoulder posture and shoulder muscles in manual material handling.

    PubMed

    Kim, Min-Hee; Yoo, Won-Gyu

    2015-06-05

    According to a recent research, manual working with high levels of static contraction, repetitive loads, or extreme working postures involving the neck and shoulder muscles causes an increased risk of neck and shoulder musculoskeletal disorders. We investigated the effects of the forwardly worktable position on head and shoulder angles and shoulder muscle activity in manual material handling tasks. The forward head and shoulder angles and the activity of upper trapezius, levator scapulae, and middle deltoid muscle activities of 15 workers were measured during performing of manual material handling in two tasks that required different forward head and shoulder angles. The second manual material task required a significantly increased forward head and shoulder angle. The upper trapezius and levator scapulae muscle activity in second manual material task was increased significantly compared with first manual material task. The middle deltoid muscle activity in second manual material task was not significantly different compared with first manual material task. Based on this result, the forward head and shoulder angles while performing manual work need to be considered in selection of the forward distance of a worktable form the body. The high level contractions of the neck and shoulder muscles correlated with neck and shoulder pain. Therefore, the forward distance of a worktable can be an important factor in preventing neck and shoulder pain in manual material handling workers.

  4. 48 CFR 1443.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  5. 48 CFR 9.504 - Contracting officer responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., contracting officers shall analyze planned acquisitions in order to— (1) Identify and evaluate potential..., or mitigate significant potential conflicts before contract award. (b) Contracting officers should... potential conflicts and in developing any necessary solicitation provisions and contract clauses (see 9.506...

  6. 48 CFR 1443.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  7. 48 CFR 370.404 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contract clause. The Contracting Officer shall insert the clause in 352.270-5(b), Care of Live Vertebrate Animals, in solicitations, contracts, and orders that involve live vertebrate animals. [75 FR 21512, Apr...

  8. 77 FR 30367 - Defense Federal Acquisition Regulation Supplement: Order of Application for Modifications (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... sequence of modifications to a contract or order, a method for determining the order of application for... application for modifications. (a) Circumstances may exist in which the numeric order of the modifications to... date and the same signature date, procuring contracting office modifications will be applied in numeric...

  9. A Contract That Manages Itself: The Time Has Arrived

    DTIC Science & Technology

    2015-02-01

    technology inspires contracting. The Smart Contract The paradigm of a contract as a static document is about to change. The days of a contract being read...efficiency is of paramount importance in order for an organization to perform its mission. The Smart Contract as an Object In discussions about...the contract object ( smart contract ) exists, the contract will be able to interact with other objects. That will enable the contract to know how

  10. 48 CFR 2943.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clauses. 2943.205 Section 2943.205 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 2943.205 Contract clauses. HCAs may establish procedures, or office policies, when...

  11. 48 CFR 801.690-2 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Supply Schedule (FSS) contracts), within the specified geographical limits of the contracting officer's... maximum order threshold of the FSS contract, within the specified geographical limits of the contracting... geographic limits of the contracting officer's warrant. This level was formally titled “Intermediate” and any...

  12. 48 CFR 801.690-2 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Supply Schedule (FSS) contracts), within the specified geographical limits of the contracting officer's... maximum order threshold of the FSS contract, within the specified geographical limits of the contracting... geographic limits of the contracting officer's warrant. This level was formally titled “Intermediate” and any...

  13. 48 CFR 801.690-2 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Supply Schedule (FSS) contracts), within the specified geographical limits of the contracting officer's... maximum order threshold of the FSS contract, within the specified geographical limits of the contracting... geographic limits of the contracting officer's warrant. This level was formally titled “Intermediate” and any...

  14. 48 CFR 243.204-70-1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Director, Defense Procurement and Acquisition Policy (Contract Policy and International Contracting), 3060..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-1 Scope. (a) This..., but the contracting officer shall apply the policy and procedures to them to the maximum extent...

  15. 48 CFR 243.204-70-1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Director, Defense Procurement and Acquisition Policy (Contract Policy and International Contracting), 3060..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-1 Scope. (a) This..., but the contracting officer shall apply the policy and procedures to them to the maximum extent...

  16. 48 CFR 2943.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Contract clauses. 2943.205 Section 2943.205 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 2943.205 Contract clauses. HCAs may establish procedures, or office policies, when...

  17. Lack of muscle contractile property changes at the time of perceived physical exhaustion suggests central mechanisms contributing to early motor task failure in patients with cancer-related fatigue.

    PubMed

    Kisiel-Sajewicz, Katarzyna; Davis, Mellar P; Siemionow, Vlodek; Seyidova-Khoshknabi, Dilara; Wyant, Alexandria; Walsh, Declan; Hou, Juliet; Yue, Guang H

    2012-09-01

    Fatigue is one of the most common symptoms reported by cancer survivors, and fatigue worsens when patients are engaged in muscle exertion, which results in early motor task failure. Central fatigue plays a significant role, more than muscle (peripheral) fatigue, in contributing to early task failure in cancer-related fatigue (CRF). The purpose of this study was to determine if muscle contractile property alterations (reflecting muscle fatigue) occurred at the end of a low-intensity muscle contraction to exhaustion and if these properties differed between those with CRF and healthy controls. Ten patients (aged 59.9±10.6 years, seven women) with advanced solid cancer and CRF and 12 age- and gender-matched healthy controls (aged 46.6±12.8 years, nine women) performed a sustained contraction of the right arm elbow flexion at 30% maximal level until exhaustion. Peak twitch force, time to peak twitch force, rate of peak twitch force development, and half relaxation time derived from electrical stimulation-evoked twitches were analyzed pre- and post-sustained contraction. CRF patients reported significantly greater fatigue as measured by the Brief Fatigue Inventory and failed the motor task earlier, 340±140 vs. 503±155 seconds in controls. All contractile property parameters did not change significantly in CRF but did change significantly in controls. CRF patients perceive physical exhaustion sooner during a motor fatigue task with minimal muscular fatigue. The observation supports that central fatigue is a more significant factor than peripheral fatigue in causing fatigue feelings and limits motor function in cancer survivors with fatigue symptoms. Copyright © 2012. Published by Elsevier Inc.

  18. The repeated-bout effect: influence on biceps brachii oxygenation and myoelectrical activity.

    PubMed

    Muthalib, Makii; Lee, Hoseong; Millet, Guillaume Y; Ferrari, Marco; Nosaka, Kazunori

    2011-05-01

    This study investigated biceps brachii oxygenation and myoelectrical activity during and following maximal eccentric exercise to better understand the repeated-bout effect. Ten men performed two bouts of eccentric exercise (ECC1, ECC2), consisting of 10 sets of 6 maximal lengthening contractions of the elbow flexors separated by 4 wk. Tissue oxygenation index minimum amplitude (TOI(min)), mean and maximum total hemoglobin volume by near-infrared spectroscopy, torque, and surface electromyography root mean square (EMG(RMS)) during exercise were compared between ECC1 and ECC2. Changes in maximal voluntary isometric contraction (MVC) torque, range of motion, plasma creatine kinase activity, muscle soreness, TOI(min), and EMG(RMS) during sustained (10-s) and 30-repeated isometric contraction tasks at 30% (same absolute force) and 100% MVC (same relative force) for 4 days postexercise were compared between ECC1 and ECC2. No significant differences between ECC1 and ECC2 were evident for changes in torque, TOI(min), mean total hemoglobin volume, maximum total hemoglobin volume, and EMG(RMS) during exercise. Smaller (P < 0.05) changes and faster recovery of muscle damage markers were evident following ECC2 than ECC1. During 30% MVC tasks, TOI(min) did not change, but EMG(RMS) increased 1-4 days following ECC1 and ECC2. During 100% MVC tasks, EMG(RMS) did not change, but torque and TOI(min) decreased 1-4 days following ECC1 and ECC2. TOI(min) during 100% MVC tasks and EMG(RMS) during 30% MVC tasks recovered faster (P < 0.05) following ECC2 than ECC1. We conclude that the repeated-bout effect cannot be explained by altered muscle activation or metabolic/hemodynamic changes, and the faster recovery in muscle oxygenation and activation was mainly due to faster recovery of force.

  19. [Claim and reality of selective contact options : experiences in finalizing selective contracts in urological care].

    PubMed

    Ex, P; Schroeder, A

    2014-08-01

    Selective contracts are an important component in addition to the total healthcare concept in order to introduce process-related innovations into the healthcare system. Since 2011 the Berufsverband der Deutschen Urologen (BDU, Professional Association of German Urologists) has held negotiations with individual health insurance companies and care providers in order to view selective contracts as collective contracts, not only as pilot projects but also as additional forms of care.This article illustrates the experiences of the BDU in the initiation and finalizing of selective contracts as well as existing weak points in the framework conditions.

  20. Contingency Contracting and Its Impact on the Use of Punctuation Skills by Fifth Graders with Learning Disabilities

    ERIC Educational Resources Information Center

    Grünke, Matthias; Coeppicus, Christin

    2017-01-01

    The purpose of this study was to assess the effectiveness of contingency contracting on the percentage of correctly used punctuation marks in free writing tasks. Participants were three 11-year-old boys with learning disabilities (LD). A multiple-baseline across-subjects design was employed to test our prediction that the students would show…

  1. Proceedings of the DOE chemical/hydrogen energy contractor review systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Chemical/hydrogen energy system contracts were reviewed. The review served as an effective means to (1) give all contracts an insight into the background and objectives of thirty-nine hydrogen-related tasks, (2) show the status of the studies or technical effort, (3) relate any problems that had impeded the progress, and (4) state projected solutions for resolving the identified problems.

  2. Evaluation of DCS III Transmission Alternatives, Phase II, Task 1.

    DTIC Science & Technology

    1981-08-31

    Agency Defense Communications Engineering Center Reston, Virginia 22090 Contract No. DCA 100-79-C--0044 ,D ii 2 01982 ONG SPACI IAE K ROONOO IIACH...Transmission Media Alternatives Task 2. Development of Evolving DCS Transmission System Al ternatives Task 3. Identification of Technology and Regulatory...For existing tree growth, add 15 m. For smaller vegetation, add 3 m. 11. Determine the antenna tower heights to insure line-of-sight clearance above the

  3. Enhanced Training by a Systemic Governance of Force Capabilities, Tasks, and Processes

    DTIC Science & Technology

    2013-06-01

    18th ICCRTS “C2 in Underdeveloped, Degraded and Denied Operational Environments” Enhanced Training by a Systemic Governance of Force Capabilities...TITLE AND SUBTITLE Enhanced Training by a Systemic Governance of Force Capabilities, Tasks, and Processes 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...assess, evaluate and accredit the Swedish forces. This paper presents a Systemic Governance of Capabilities, Tasks, and Processes applied to the

  4. Cost and Schedule Analytical Techniques Development: Option 2 Year

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  5. 78 FR 11699 - International Mail Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... additional International Business Reply Service (IBRS) Competitive Contract 3 negotiated service agreement... International Business Reply Service Competitive Contract 3 Negotiated Service Agreement, February 11, 2013.... 684, Order Approving International Business Reply Service Competitive Contract 3 Negotiated Service...

  6. Running Head: Evaluation of Contract Versus VA-Staffed CBOCs. Evaluating Contract versus VA-Staffed Community Based Outpatient Clinics (CBOCs) Using Patient Satisfaction and Access Measures in the Veterans Health Administration

    DTIC Science & Technology

    2009-06-01

    Contract versus VA-Staffed Community Based Outpatient Clinics (CBOCS) Using Patient Satisfaction and Access Measures in the Veterans Health ...Administration 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Belote, Janna, M., Civilian - Veterans Health Administration 5d. PROJECT NUMBER 5e...TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Central Arkansas Veterans Healthcare System 4300 West 7th

  7. 77 FR 65034 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... that trade against Priority Customer orders in the Select Symbols, SPY, Non-Select Penny Pilot Symbols...,\\8\\ Firm Proprietary/Broker-Dealer and Professional Customer \\9\\ orders; (ii) $0.20 per contract for Non-ISE Market Maker \\10\\ orders; and (iii) $0.00 per contract for Priority Customer \\11\\ orders. For...

  8. 42 CFR 414.402 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... as part of an original bid submission under a competitive acquisition program in order to meet the... competitive bidding (for example, a product when it is furnished through mail order), or a combination of... other items in the same product category. Mail order contract supplier is a contract supplier that...

  9. Eccentric muscle damage has variable effects on motor unit recruitment thresholds and discharge patterns in elbow flexor muscles.

    PubMed

    Dartnall, Tamara J; Rogasch, Nigel C; Nordstrom, Michael A; Semmler, John G

    2009-07-01

    The purpose of this study was to determine the effect of eccentric muscle damage on recruitment threshold force and repetitive discharge properties of low-threshold motor units. Ten subjects performed four tasks involving isometric contraction of elbow flexors while electromyographic (EMG) data were recorded from human biceps brachii and brachialis muscles. Tasks were 1) maximum voluntary contraction (MVC); 2) constant-force contraction at various submaximal targets; 3) motor unit recruitment threshold task; and 4) minimum motor unit discharge rate task. These tasks were performed on three separate days before, immediately after, and 24 h after eccentric exercise of elbow flexor muscles. MVC force declined (42%) immediately after exercise and remained depressed (29%) 24 h later, indicative of muscle damage. Mean motor unit recruitment threshold for biceps brachii was 8.4+/-4.2% MVC, (n=34) before eccentric exercise, and was reduced by 41% (5.0+/-3.0% MVC, n=34) immediately after and by 39% (5.2+/-2.5% MVC, n=34) 24 h after exercise. No significant changes in motor unit recruitment threshold were observed in the brachialis muscle. However, for the minimum tonic discharge rate task, motor units in both muscles discharged 11% faster (10.8+/-2.0 vs. 9.7+/-1.7 Hz) immediately after (n=29) exercise compared with that before (n=32). The minimum discharge rate variability was greater in brachialis muscle immediately after exercise (13.8+/-3.1%) compared with that before (11.9+/-3.1%) and 24 h after exercise (11.7+/-2.4%). No significant changes in minimum discharge rate variability were observed in the biceps brachii motor units after exercise. These results indicate that muscle damage from eccentric exercise alters motor unit recruitment thresholds for >or=24 h, but the effect is not the same in the different elbow flexor muscles.

  10. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses. (a)(1...

  11. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses. (a)(1...

  12. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses. (a)(1...

  13. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses. (a)(1...

  14. 48 CFR 1843.205-70 - NASA contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clauses. 1843.205-70 Section 1843.205-70 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205-70 NASA contract clauses. (a)(1...

  15. 48 CFR 243.204-70-6 - Allowable profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-6 Allowable profit. When the final price of an unpriced change order is negotiated after a substantial portion...

  16. 48 CFR 243.204-70-6 - Allowable profit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-6 Allowable profit. When the final price of an unpriced change order is negotiated after a substantial portion...

  17. 48 CFR 243.204-70-2 - Price ceiling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-2 Price ceiling. Unpriced change orders shall include a not-to-exceed price. [75 FR 48277, Aug. 10, 2010] ...

  18. Analysis of force profile during a maximum voluntary isometric contraction task.

    PubMed

    Househam, Elizabeth; McAuley, John; Charles, Thompson; Lightfoot, Timothy; Swash, Michael

    2004-03-01

    This study analyses maximum voluntary isometric contraction (MVIC) and its measurement by recording the force profile during maximal-effort, 7-s hand-grip contractions. Six healthy subjects each performed three trials repeated at short intervals to study variation from fatigue. These three trials were performed during three separate sessions at daily intervals to look at random variation. A pattern of force development during a trial was identified. An initiation phase, with or without an initiation peak, was followed by a maintenance phase, sometimes with secondary pulses and an underlying decline in force. Of these three MVIC parameters, maximum force during the maintenance phase showed less random variability compared to intertrial fatigue variability than did maximum force during the initiation phase or absolute maximum force. Analysis of MVIC as a task, rather than a single, maximal value reveals deeper levels of motor control in its generation. Thus, force parameters other than the absolute maximum force may be better suited to quantification of muscle performance in health and disease.

  19. [Organization and technology in the grocery store sector].

    PubMed

    Gambetti, Edy

    2014-01-01

    In Italy, grocery stores develop an annual turnover of 92 billion of , (data referred to 2013) and have 28.232 stores spread over a commercial area of 17.224.000 m2. The business involved are 252, linked with 30 important distribution leader companies. The total workforce is about 280.000 people. The grocery stores structure is composed by suppliers and producers warehouses and different kinds of stores (hypermarkets, supermarkets, shops and discounts). In the stores, the technological progress concerns fundamentally back-office operations; the improvement of information and computer science is the main renewal source. Other tasks as receiving goods and stocking shelves are still executed without specific inovations. In terms of organization, we observed a strong increase of part-time workers, the development of atypical contract and thie inclination to contract the easiest jobs (for example, stocking shelves). Also the warehouses often use to sub-contract the picking tasks. The increase of on-line shopping, also concerning the groceries, represents the most relevant evolution in tire near future.

  20. Task complexity and maximal isometric strength gains through motor learning

    PubMed Central

    McGuire, Jessica; Green, Lara A.; Gabriel, David A.

    2014-01-01

    Abstract This study compared the effects of a simple versus complex contraction pattern on the acquisition, retention, and transfer of maximal isometric strength gains and reductions in force variability. A control group (N = 12) performed simple isometric contractions of the wrist flexors. An experimental group (N = 12) performed complex proprioceptive neuromuscular facilitation (PNF) contractions consisting of maximal isometric wrist extension immediately reversing force direction to wrist flexion within a single trial. Ten contractions were completed on three consecutive days with a retention and transfer test 2‐weeks later. For the retention test, the groups performed their assigned contraction pattern followed by a transfer test that consisted of the other contraction pattern for a cross‐over design. Both groups exhibited comparable increases in strength (20.2%, P < 0.01) and reductions in mean torque variability (26.2%, P < 0.01), which were retained and transferred. There was a decrease in the coactivation ratio (antagonist/agonist muscle activity) for both groups, which was retained and transferred (35.2%, P < 0.01). The experimental group exhibited a linear decrease in variability of the torque‐ and sEMG‐time curves, indicating transfer to the simple contraction pattern (P < 0.01). The control group underwent a decrease in variability of the torque‐ and sEMG‐time curves from the first day of training to retention, but participants returned to baseline levels during the transfer condition (P < 0.01). However, the difference between torque RMS error versus the variability in torque‐ and sEMG‐time curves suggests the demands of the complex task were transferred, but could not be achieved in a reproducible way. PMID:25428951

  1. 77 FR 63911 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... (excluding SPY), the Exchange currently charges a taker fee of: (i) $0.37 per contract for Market Maker,\\6... order taker fee in the Select Symbols (excluding SPY) to $0.39 per contract for Firm Proprietary/Broker... to increase the complex order taker fee in SPY to $0.40 per contract for Firm Proprietary/Broker...

  2. 77 FR 49049 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ... for Non-ISE Market Maker \\6\\ orders, (iii) $0.30 per contract for Firm Proprietary/Broker-Dealer and... in the Select Symbols from $0.29 per contract to $0.32 per contract, (ii) Non-ISE Market Maker orders... not they are meeting the Exchange's stated criteria. \\6\\ A Non-ISE Market Maker, or Far Away Market...

  3. 78 FR 24265 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... transaction fees and provides rebates to market participants that add or remove liquidity from the Exchange...: (i) $0.32 per contract for Market Maker \\4\\ and Market Maker Plus \\5\\ orders, (ii) $0.36 per contract for Non-ISE Market Maker \\6\\ orders, (iii) $0.33 per contract for Firm Proprietary/Broker-Dealer and...

  4. A supply chain contract with flexibility as a risk-sharing mechanism for demand forecasting

    NASA Astrophysics Data System (ADS)

    Kim, Whan-Seon

    2013-06-01

    Demand forecasting is one of the main causes of the bullwhip effect in a supply chain. As a countermeasure for demand uncertainty as well as a risk-sharing mechanism for demand forecasting in a supply chain, this article studies a bilateral contract with order quantity flexibility. Under the contract, the buyer places orders in advance for the predetermined horizons and makes minimum purchase commitments. The supplier, in return, provides the buyer with the flexibility to adjust the order quantities later, according to the most updated demand information. To conduct comparative simulations, four-echelon supply chain models, that employ the contracts and different forecasting techniques under dynamic market demands, are developed. The simulation outcomes show that demand fluctuation can be effectively absorbed by the contract scheme, which enables better inventory management and customer service. Furthermore, it has been verified that the contract scheme under study plays a role as an effective coordination mechanism in a decentralised supply chain.

  5. An investigation into the variability of primary care oral surgery contracts and tariffs in England and Wales (2014/2015).

    PubMed

    Hierons, R J; Gerrard, G; Jones, R

    2017-06-09

    Primary care oral surgery services vary markedly throughout the country but until now there has been a paucity of data on these services. The British Association of Oral Surgeons (BAOS) primary care group (the authors) were tasked to gather data around primary care oral surgery contracts and tariffs and provide evidence-based recommendations on the commissioning of these services. Following a freedom of information (FOI) request, data were obtained for 27 English local area teams and seven Welsh local health boards. The data demonstrated both regional and national variability with respect to primary care oral surgery contracts, concerning both contract type and level of remuneration. These differences are discussed and the authors make recommendations for standardising oral surgery contracts and tariffs.

  6. Muscle function and fatigability of trunk flexors in males and females.

    PubMed

    Deering, Rita E; Senefeld, Jonathon W; Pashibin, Tatyana; Neumann, Donald A; Hunter, Sandra K

    2017-01-01

    Optimal function of the abdominal muscles is necessary for several life functions including lifting and carrying tasks. Sex differences in strength and fatigability are established for many limb muscles and back extensor muscles, but it is unknown if sex differences exist for the abdominal muscles despite their functional importance. Eighteen females (24.3 ± 4.8 years) and 15 males (24.1 ± 6.6 years) performed (1) isometric trunk flexion maximal voluntary contractions (MVCs) in a range of trunk positions to establish a torque-angle curve and (2) submaximal (50% MVC), intermittent isometric contraction (6 s on, 4 s off) until task failure to determine fatigability of the trunk flexor muscles. Dual X-ray absorptiometry quantified body fat and lean mass. Physical activity levels were quantified with a questionnaire. Torque-angle curves, electromyography (EMG), MVC torque, and torque steadiness were compared with repeated measures ANOVA with sex as a between-subjects factor. For the torque-angle curve, MVC torque was reduced as the trunk angle increased toward flexion ( p  < 0.001). Males had greater MVC torque than females at the extended positions (31% difference), with no sex differences in torque in upright sitting ( p >  0.05). Time-to-task failure for the submaximal fatigability task in upright sitting was similar between males and females (12.4 ± 7 vs 10.5 ± 6 min). Time-to-task failure was positively associated with strength ( r  = 0.473, p  = 0.005) and self-reported physical activity ( r  = 0.456, p  = 0.030). Lean mass in the trunk was positively associated with trunk flexor strength ( r  = 0.378, p  = 0.011) and self-reported physical activity ( r  = 0.486, p  = 0.007). Finally, torque steadiness [coefficient of variation of torque (CV)] during submaximal isometric contractions decreased with contraction intensity and was similar for males and females across all intensities. Unlike many limb muscle groups, males and females had similar fatigability and torque steadiness of the trunk flexor muscles during isometric contractions. Stronger individuals, however, exhibited less fatigability. Lower self-reported physical activity was associated with greater fatigability of trunk flexor muscles. The relationship between strength and fatigability of the trunk flexor muscles and physical activity supports the importance of abdominal muscle strengthening to offset fatigability in both males and females.

  7. 7 CFR 1726.405 - Inventory of work orders (RUS Form 219).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Inventory of work orders (RUS Form 219). 1726.405... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.405 Inventory of work orders (RUS Form 219). Upon completion of the contract closeout, the...

  8. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  9. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  10. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  11. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  12. 41 CFR 109-27.102 - Economic order quantity principle.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Economic order quantity principle. 109-27.102 Section 109-27.102 Public Contracts and Property Management Federal Property... PROCUREMENT 27-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102 Economic order quantity principle. ...

  13. 48 CFR 970.5223-6 - Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Strengthening Federal Environmental, Energy, and Transportation Management. 970.5223-6 Section 970.5223-6... Contracts 970.5223-6 Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation... contracts for the operation of a DOE facility or motor vehicle fleet. Executive Order 13423, Strengthening...

  14. 48 CFR 970.5223-6 - Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Strengthening Federal Environmental, Energy, and Transportation Management. 970.5223-6 Section 970.5223-6... Contracts 970.5223-6 Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation... contracts for the operation of a DOE facility or motor vehicle fleet. Executive Order 13423, Strengthening...

  15. 48 CFR 970.5223-6 - Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Strengthening Federal Environmental, Energy, and Transportation Management. 970.5223-6 Section 970.5223-6... Contracts 970.5223-6 Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation... contracts for the operation of a DOE facility or motor vehicle fleet. Executive Order 13423, Strengthening...

  16. 48 CFR 970.5223-6 - Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., Strengthening Federal Environmental, Energy, and Transportation Management. 970.5223-6 Section 970.5223-6... Contracts 970.5223-6 Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation... contracts for the operation of a DOE facility or motor vehicle fleet. EXECUTIVE ORDER 13423, STRENGTHENING...

  17. 48 CFR 52.243-4 - Changes.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... agency procedures. Changes (JUN 2007) (a) The Contracting Officer may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make changes in the work... changed by any such order, the Contracting Officer shall make an equitable adjustment and modify the...

  18. 48 CFR 52.243-4 - Changes.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... agency procedures. Changes (JUN 2007) (a) The Contracting Officer may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make changes in the work... changed by any such order, the Contracting Officer shall make an equitable adjustment and modify the...

  19. 48 CFR 52.243-4 - Changes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... agency procedures. Changes (JUN 2007) (a) The Contracting Officer may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make changes in the work... changed by any such order, the Contracting Officer shall make an equitable adjustment and modify the...

  20. 48 CFR 52.243-4 - Changes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... agency procedures. Changes (JUN 2007) (a) The Contracting Officer may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make changes in the work... changed by any such order, the Contracting Officer shall make an equitable adjustment and modify the...

  1. 48 CFR 43.201 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 43.201 General. (a) Generally, Government contracts contain a changes clause that permits the contracting officer to make unilateral changes, in designated areas, within the general scope...

  2. 78 FR 11237 - International Mail Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-49; Order No. 1654] International Mail Contract... Service filing concerning an additional Global Reseller Expedited Package Contract 1 Negotiated Service... additional Global Reseller Expedited Package Contracts 1 negotiated service agreement (Agreement).\\1\\ It...

  3. 48 CFR 43.201 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 43.201 General. (a) Generally, Government contracts contain a changes clause that permits the contracting officer to make unilateral changes, in designated areas, within the general scope...

  4. Evidence for modality-independent order coding in working memory.

    PubMed

    Depoorter, Ann; Vandierendonck, André

    2009-03-01

    The aim of the present study was to investigate the representation of serial order in working memory, more specifically whether serial order is coded by means of a modality-dependent or a modality-independent order code. This was investigated by means of a series of four experiments based on a dual-task methodology in which one short-term memory task was embedded between the presentation and recall of another short-term memory task. Two aspects were varied in these memory tasks--namely, the modality of the stimulus materials (verbal or visuo-spatial) and the presence of an order component in the task (an order or an item memory task). The results of this study showed impaired primary-task recognition performance when both the primary and the embedded task included an order component, irrespective of the modality of the stimulus materials. If one or both of the tasks did not contain an order component, less interference was found. The results of this study support the existence of a modality-independent order code.

  5. Software Product Lines: Report of the 2010 US Army Software Product Line Workshop

    DTIC Science & Technology

    2010-06-01

    requirements and statement of work ( SOW ) tasks can be in- cluded in the request for proposal (RFP) and the contract. 2.2.1 Basic Product Line Acquisition... SOW tasks in Figure 1. Two additional tasks (at the third tier level) ac- count for sustaining the production capability over the life cycle and...Acquisition Strategy RFP and SOW Initial Product Line Scope Product Line Business Case Capability Description Document Teaming Product Line

  6. Effect of Auditory Constraints on Motor Performance Depends on Stage of Recovery Post-Stroke

    PubMed Central

    Aluru, Viswanath; Lu, Ying; Leung, Alan; Verghese, Joe; Raghavan, Preeti

    2014-01-01

    In order to develop evidence-based rehabilitation protocols post-stroke, one must first reconcile the vast heterogeneity in the post-stroke population and develop protocols to facilitate motor learning in the various subgroups. The main purpose of this study is to show that auditory constraints interact with the stage of recovery post-stroke to influence motor learning. We characterized the stages of upper limb recovery using task-based kinematic measures in 20 subjects with chronic hemiparesis. We used a bimanual wrist extension task, performed with a custom-made wrist trainer, to facilitate learning of wrist extension in the paretic hand under four auditory conditions: (1) without auditory cueing; (2) to non-musical happy sounds; (3) to self-selected music; and (4) to a metronome beat set at a comfortable tempo. Two bimanual trials (15 s each) were followed by one unimanual trial with the paretic hand over six cycles under each condition. Clinical metrics, wrist and arm kinematics, and electromyographic activity were recorded. Hierarchical cluster analysis with the Mahalanobis metric based on baseline speed and extent of wrist movement stratified subjects into three distinct groups, which reflected their stage of recovery: spastic paresis, spastic co-contraction, and minimal paresis. In spastic paresis, the metronome beat increased wrist extension, but also increased muscle co-activation across the wrist. In contrast, in spastic co-contraction, no auditory stimulation increased wrist extension and reduced co-activation. In minimal paresis, wrist extension did not improve under any condition. The results suggest that auditory task constraints interact with stage of recovery during motor learning after stroke, perhaps due to recruitment of distinct neural substrates over the course of recovery. The findings advance our understanding of the mechanisms of progression of motor recovery and lay the foundation for personalized treatment algorithms post-stroke. PMID:25002859

  7. 77 FR 26595 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Suspension of and Order Instituting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ...'') resulting from a Customer order that is (1) directed to it by an order flow provider, and (2) executed by it... rebates, which attracts additional Customer order flow to the Exchange and benefits all market... Customer Rebate for Adding Liquidity from $0.30 per contract to $0.32 per contract; (2) created a new...

  8. 77 FR 10579 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... participants that add or remove liquidity in the Complex Order Book (``maker/taker fees'') in symbols that are... liquidity on the Complex Order Book and $0.30 per contract ($0.32 per contract in the Select Symbols) for taking liquidity from the Complex Order Book. ISE market makers who take liquidity from the Complex Order...

  9. Teamwork in Task Analysis. Training Manual V

    DTIC Science & Technology

    1975-11-01

    Research Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370 Approved for public...Corps (Code RD) And Monitored By Personnel and Training Research Programs Psychological Sciences Division Office of Naval Research Contract No...survival in the hidden warfare of the destructive psychological win-lose game. Win-lose behavior stems from individual attitudes and manage- ment climate

  10. Holistic Contract Administration in Army Forces Abroad

    DTIC Science & Technology

    2016-10-01

    Defense (DoD) civil- ian personnel—i.e., 1910 Quality Assurance Specialist, 1102 Contract Specialist, and 1103 Industrial Property Management Specialist... 1103 -series civilian property ad- ministrators throughout ACC, the battalion experienced diffi- culties hiring for these positions during its deployment...tasks. Counting on 1103 support, ACOs received minimal property training prior to deploy- ment. This proved to be a major setback as ACOs struggled

  11. Rail Sensor Testbed Program: Active Agents in Containers for Transport Chain Security

    DTIC Science & Technology

    2011-01-01

    Irving Hill Road, Lawrence, KS 66045-7559 All rights reserved. Project Sponsor: Office of Naval Research Contract: N00014-07-1-1042 The University of... RESEARCH TASKS ........................................................................................................................................... 5...describes the research tasks and Section 4 lists published papers and personnel who worked on the project. There are two appendices. Appendix A describes

  12. Sex Differences in Arm Muscle Fatigability With Cognitive Demand in Older Adults.

    PubMed

    Pereira, Hugo M; Spears, Vincent C; Schlinder-Delap, Bonnie; Yoon, Tejin; Harkins, April; Nielson, Kristy A; Hoeger Bement, Marie; Hunter, Sandra K

    2015-08-01

    Muscle fatigability can increase when a stressful, cognitively demanding task is imposed during a low-force fatiguing contraction with the arm muscles, especially in women. Whether this occurs among older adults (>60 years) is currently unknown. We aimed to determine if higher cognitive demands, stratified by sex, increased fatigability in older adults (>60 years). Secondarily, we assessed if varying cognitive demand resulted in decreased steadiness and was explained by anxiety or cortisol levels. Seventeen older women (70±6 years) and 13 older men (71±5 years) performed a sustained, isometric, fatiguing contraction at 20% of maximal voluntary contraction until task failure during three sessions: high cognitive demand (high CD=mental subtraction by 13); low cognitive demand (low CD=mental subtraction by 1); and control (no subtraction). Fatigability was greater when high and low CD were performed during the fatiguing contraction for the women but not for the men. In women, time to failure with high CD was 16±8 minutes and with low CD was 17±4 minutes, both of which were shorter than time to failure in control contractions (21±7 minutes; high CD mean difference: 5 minutes [95% confidence interval {CI}, 0.78-9.89], p=0.02; low CD mean difference: 4 minutes [95% CI, 0.57-7.31], p=0.03). However, in men, no differences were detected in time to failure with cognitive demand (control: 13±5 minutes; high CD mean difference: -0.09 minutes [95% CI, -2.8 to 2.7], p=1.00; low CD mean difference: 0.75 minutes [95% CI, -1.1 to 2.6], p=0.85). Steadiness decreased (force fluctuations increased) more during high CD than control. Elevated anxiety, mean arterial pressure, and salivary cortisol levels in both men and women did not explain the greater fatigability during high CD. Older women but not men showed marked increases in fatigability when low or high CD was imposed during sustained static contractions with the elbow flexor muscles and contrasts with previous findings for the lower limb. Steadiness decreased in both sexes when high CD was imposed. Older women are susceptible to greater fatigability of the upper limb with heightened mental activity during sustained postural contractions, which are the foundation of many work-related tasks.

  13. 77 FR 26583 - International Mail Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2012-21; Order No. 1325] International Mail Contract... Package contract. This document invites public comments on the request and addresses several related... additional Global Reseller Expedited Package (GREP) contract.\\1\\ The Postal Service states that the instant...

  14. 48 CFR 217.7104 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 217.7104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for...) 252.217-7004, Job Orders and Compensation. (3) 252.217-7005, Inspection and Manner of Doing Work. (4...

  15. 48 CFR 217.7104 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 217.7104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for...) 252.217-7004, Job Orders and Compensation. (3) 252.217-7005, Inspection and Manner of Doing Work. (4...

  16. 48 CFR 217.7104 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 217.7104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for...) 252.217-7004, Job Orders and Compensation. (3) 252.217-7005, Inspection and Manner of Doing Work. (4...

  17. 48 CFR 217.7104 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 217.7104 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for...) 252.217-7004, Job Orders and Compensation. (3) 252.217-7005, Inspection and Manner of Doing Work. (4...

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s advanced vehicle testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America to conduct several U.S. Department of Defense-based micro-climate studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). The study included Joint Base Lewis McChord, located in Washington State; Naval Air Station Whidbey Island, located in Washington State; and United States Marine Corp Base Camp Lejeune,more » located in North Carolina. The project was divided into four tasks for each of the three bases studied. Task 1 consisted of surveying the non-tactical fleet of vehicles to begin review of vehicle mission assignments and types of vehicles in service. In Task 2, the daily operational characteristics of the vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. Results of the data analysis and observations were provided. Individual observations of these selected vehicles provided the basis for recommendations related to PEV adoption (i.e., whether a battery electric vehicle or plug-in hybrid electric vehicle [collectively referred to as PEVs] can fulfill the mission requirements). It also provided the basis for recommendations related to placement of PEV charging infrastructure. In Task 4, an implementation approach was provided for near-term adoption of PEVs into the respective fleets. Each facility was provided detailed reports on each of these tasks. This paper summarizes and provides observations on the project and completes Intertek’s required actions.« less

  19. Effects of transcranial direct current stimulation of the motor cortex on prefrontal cortex activation during a neuromuscular fatigue task: an fNIRS study.

    PubMed

    Muthalib, Makii; Kan, Benjamin; Nosaka, Kazunori; Perrey, Stephane

    2013-01-01

    This study investigated whether manipulation of motor cortex excitability by transcranial direct current stimulation (tDCS) modulates neuromuscular fatigue and functional near-infrared spectroscopy (fNIRS)-derived prefrontal cortex (PFC) activation. Fifteen healthy men (27.7 ± 8.4 years) underwent anodal (2 mA, 10 min) and sham (2 mA, first 30 s only) tDCS delivered to the scalp over the right motor cortex. Subjects initially performed a baseline sustained submaximal (30 % maximal voluntary isometric contraction, MVC) isometric contraction task (SSIT) of the left elbow flexors until task failure, which was followed 50 min later by either an anodal or sham treatment condition, then a subsequent posttreatment SSIT. Endurance time (ET), torque integral (TI), and fNIRS-derived contralateral PFC oxygenated (O2Hb) and deoxygenated (HHb) hemoglobin concentration changes were determined at task failure. Results indicated that during the baseline and posttreatment SSIT, there were no significant differences in TI and ET, and increases in fNIRS-derived PFC activation at task failure were observed similarly regardless of the tDCS conditions. This suggests that the PFC neuronal activation to maintain muscle force production was not modulated by anodal tDCS.

  20. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  1. Scientific Data Analysis and Software Support: Geodynamics

    NASA Technical Reports Server (NTRS)

    Klosko, Steven; Sanchez, B. (Technical Monitor)

    2000-01-01

    The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.

  2. Age-related differences in finger force control are characterized by reduced force production.

    PubMed

    Vieluf, Solveig; Godde, Ben; Reuter, Eva-Maria; Voelcker-Rehage, Claudia

    2013-01-01

    It has been repeatedly shown that precise finger force control declines with age. The tasks and evaluation parameters used to reveal age-related differences vary between studies. In order to examine effects of task characteristics, young adults (18-25 years) and late middle-aged adults (55-65 years) performed precision grip tasks with varying speed and force requirements. Different outcome variables were used to evaluate age-related differences. Age-related differences were confirmed for performance accuracy (TWR) and variability (relative root mean square error, rRMSE). The task characteristics, however, influenced accuracy and variability in both age groups: Force modulation performance at higher speed was poorer than at lower speed and at fixed force levels than at force levels adjusted to the individual maximum forces. This effect tended to be stronger for older participants for the rRMSE. A curve fit confirmed the age-related differences for both spatial force tracking parameters (amplitude and intercept) and for one temporal parameter (phase shift), but not for the temporal parameter frequency. Additionally, matching the timing parameters of the sine wave seemed to be more important than matching the spatial parameters in both young adults and late middle-aged adults. However, the effect was stronger for the group of late middle-aged, even though maximum voluntary contraction was not significantly different between groups. Our data indicate that changes in the processing of fine motor control tasks with increasing age are caused by difficulties of late middle-aged adults to produce a predefined amount of force in a short time.

  3. 75 FR 8762 - NASDAQ OMX PHLX, Inc.; Order of Summary Abrogation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... other things, assess a transaction fee of $0.05 per contract on Phlx specialists, Streaming Quote Traders (``SQTs'') and Remote Streaming Quote Traders (``RSQTs'') \\2\\ for equity option orders directed to... assessed a transaction fee of $0.21 per contract when it trades with an order not directed to it. In SR...

  4. 48 CFR 243.204-70-5 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-5 Exceptions. (a) The limitations in 243.204-70-2, 243.204-70-3, and 243.204-70-4 do not apply to unpriced change orders... change orders for ship construction and ship repair. (c) The head of the agency may waive the limitations...

  5. 48 CFR 243.204-70-5 - Exceptions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-5 Exceptions. (a) The limitations in 243.204-70-2, 243.204-70-3, and 243.204-70-4 do not apply to unpriced change orders... change orders for ship construction and ship repair. (c) The head of the agency may waive the limitations...

  6. Muscle vibration sustains motor unit firing rate during submaximal isometric fatigue in humans

    PubMed Central

    Griffin, L; Garland, S J; Ivanova, T; Gossen, E R

    2001-01-01

    In keeping with the ‘muscular wisdom hypothesis’, many studies have documented that the firing rate of the majority of motor units decreased during fatiguing isometric contractions. The present study investigated whether the application of periodic muscle vibration, which strongly activates muscle spindles, would alter the modulation of motor unit firing rate during submaximal fatiguing isometric contractions. Thirty-three motor units from the lateral head of the triceps brachii muscle were recorded from 10 subjects during a sustained isometric 20 % maximal voluntary contraction (MVC) of the elbow extensors. Vibration was interposed on the contraction for 2 s every 10 s. Twenty-two motor units were recorded from the beginning of the fatigue task. The discharge rate of the majority of motor units remained constant (12/22) or increased (4/22) with fatigue. Six motor units demonstrated a reduction in discharge rate that later returned toward initial values; these motor units had higher initial discharge rates than the other 16 motor units. In a second series of experiments, four subjects held a sustained isometric 20 % MVC for 2 min and then vibration was applied as above for the remainder of the contraction. In this case, motor units initially demonstrated a decrease in firing rate that increased after the vibration was applied. Thus muscle spindle disfacilitation of the motoneurone pool may be associated with the decline of motor unit discharge rate observed during the first 2 min of the contraction. In a third set of experiments, seven subjects performed the main experiment on one occasion and repeated the fatigue task without vibration on a second occasion. Neither the endurance time of the fatiguing contraction nor the MVC torque following fatigue was affected by the application of vibration. This finding calls into question the applicability of the muscular wisdom hypothesis to submaximal contractions. PMID:11559785

  7. Muscle vibration sustains motor unit firing rate during submaximal isometric fatigue in humans.

    PubMed

    Griffin, L; Garland, S J; Ivanova, T; Gossen, E R

    2001-09-15

    1. In keeping with the 'muscular wisdom hypothesis', many studies have documented that the firing rate of the majority of motor units decreased during fatiguing isometric contractions. The present study investigated whether the application of periodic muscle vibration, which strongly activates muscle spindles, would alter the modulation of motor unit firing rate during submaximal fatiguing isometric contractions. 2. Thirty-three motor units from the lateral head of the triceps brachii muscle were recorded from 10 subjects during a sustained isometric 20 % maximal voluntary contraction (MVC) of the elbow extensors. Vibration was interposed on the contraction for 2 s every 10 s. Twenty-two motor units were recorded from the beginning of the fatigue task. The discharge rate of the majority of motor units remained constant (12/22) or increased (4/22) with fatigue. Six motor units demonstrated a reduction in discharge rate that later returned toward initial values; these motor units had higher initial discharge rates than the other 16 motor units. 3. In a second series of experiments, four subjects held a sustained isometric 20 % MVC for 2 min and then vibration was applied as above for the remainder of the contraction. In this case, motor units initially demonstrated a decrease in firing rate that increased after the vibration was applied. Thus muscle spindle disfacilitation of the motoneurone pool may be associated with the decline of motor unit discharge rate observed during the first 2 min of the contraction. 4. In a third set of experiments, seven subjects performed the main experiment on one occasion and repeated the fatigue task without vibration on a second occasion. Neither the endurance time of the fatiguing contraction nor the MVC torque following fatigue was affected by the application of vibration. This finding calls into question the applicability of the muscular wisdom hypothesis to submaximal contractions.

  8. 48 CFR 9.504 - Contracting officer responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contracting officer responsibilities. (a) Using the general rules, procedures, and examples in this subpart, contracting officers shall analyze planned acquisitions in order to— (1) Identify and evaluate potential... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contracting officer...

  9. 76 FR 78712 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ...\\ of the Fee Schedule. Currently, the Exchange pays a rebate of $0.05 per contract for all executed eQCC Orders. Today, the Exchange does not pay a rebate for Floor QCC Orders. The Exchange proposes to pay a rebate of $0.07 per contract for all executed eQCC Orders and Floor QCC Orders with some...

  10. Feasibility of remotely manipulated welding in space: A step in the development of novel joining technologies

    NASA Technical Reports Server (NTRS)

    Masubuchi, K.; Agapakis, J. E.; Debiccari, A.; Vonalt, C.

    1985-01-01

    A six month research program entitled Feasibility of Remotely Manipulated Welding in Space - A Step in the Development of Novel Joining Technologies is performed at the Massachusetts Institute of Technology for the Office of Space Science and Applications, NASA, under Contract No. NASW-3740. The work is performed as a part of the Innovative Utilization of the Space Station Program. The final report from M.I.T. was issued in September 1983. This paper presents a summary of the work performed under this contract. The objective of this research program is to initiate research for the development of packaged, remotely controlled welding systems for space construction and repair. The research effort includes the following tasks: (1) identification of probable joining tasks in space; (2) identification of required levels of automation in space welding tasks; (3) development of novel space welding concepts; (4) development of recommended future studies; and (5) preparation of the final report.

  11. Guidance, Navigation and Control Digital Emulation Technology Laboratory. Volume 1. Part 2. Task 1: Digital Emulation Technology Laboratory

    DTIC Science & Technology

    1991-09-27

    AD-A241 692 II I] II I11 ANNUAL REPORT VOLUME 1 PART 2 TASK 1: DIGITAL EMULATION TECHNOLOGY LABORATOIRY REPORT NO. AR-0142-91-001 September 27, 1991... DIGITAL EMULATION TECHNOLOGY LABORATORY Contract No. DASG60-89-C-0142 Sponsored By The United States Army ? trategic Defense Command COMPUTER...ANNUAL REPORT VOLUME 1 PART 2 TASK 1: DIGITAL EMULATION TECHNOLOGY LABORATORY September 27, 1991 Authors Thomas R. Collins and Stephen R. Wachtel

  12. Advanced transportation system study: Manned launch vehicle concepts for two way transportation system payloads to LEO. Work breakdown structure and work breakdown structure dictionary

    NASA Technical Reports Server (NTRS)

    Duffy, James B.

    1992-01-01

    The report describes the work breakdown structure (WBS) and its associated WBS dictionary for task area 1 of contract NAS8-39207, advanced transportation system studies (ATSS). This WBS format is consistent with the preliminary design level of detail employed by both task area 1 and task area 4 in the ATSS study and is intended to provide an estimating structure for parametric cost estimates.

  13. Cooperative runtime monitoring

    NASA Astrophysics Data System (ADS)

    Hallé, Sylvain

    2013-11-01

    Requirements on message-based interactions can be formalised as an interface contract that specifies constraints on the sequence of possible messages that can be exchanged by multiple parties. At runtime, each peer can monitor incoming messages and check that the contract is correctly being followed by their respective senders. We introduce cooperative runtime monitoring, where a recipient 'delegates' its monitoring task to the sender, which is required to provide evidence that the message it sends complies with the contract. In turn, this evidence can be quickly checked by the recipient, which is then guaranteed of the sender's compliance to the contract without doing the monitoring computation by itself. A particular application of this concept is shown on web services, where service providers can monitor and enforce contract compliance of third-party clients at a small cost on the server side, while avoiding to certify or digitally sign them.

  14. 48 CFR 13.302 - Purchase orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Purchase orders. 13.302 Section 13.302 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Simplified Acquisition Methods 13.302 Purchase...

  15. Multiple job contracts of physicians in Ceará, Northeastern Brazil.

    PubMed

    Maciel, Regina Heloisa; Santos, João Bosco Feitosa dos; Sales, Telma Bessa; Alves, Marco Aurélio de Andrade; Luna, Ana Paula; Feitosa, Leonardo Bezerra

    2010-10-01

    To analyze the multiple job contracts of physicians in the Brazilian National Health System in the State of Ceará. Documental research was performed about the work contracts of the physicians, based on data of health professional contracts in the municipalities of Ceará state, Northeastern Brazil, in 2008. Indices were created for the quantity of contracts of each physician, as well as the municipalities where each physician maintained work contracts. The distances between the municipalities where they worked was calculated in order to estimate the total weekly hours of work. Of the 7,008 physicians employed by the Ceará state, 3,751 (53.5%) maintain between two and four job contracts and 39 (0.6%) between 11 and 20 contracts. One professional maintained 20 contracts. More than half (51.9%) of the physicians had work contracts that when summed totaled more than 40 weekly working hours and 27.0% (1,894) maintained job contracts with more than one municipality. In order to increase their work income, physicians undertake various jobs, practicing their profession in different locations and various municipalities, involving constant travel and contributing to the precarious conditions of their own lives and, therefore, of the public health system.

  16. Analytical study of electrical disconnect system for use on manned and unmanned missions

    NASA Technical Reports Server (NTRS)

    Rosener, A. A.; Lenda, J. A.; Trummer, R. O.

    1976-01-01

    The objective of this contract is to establish an optimum electrical disconnect system design(s) for use on manned and unmanned missions. The purpose of the disconnect system is to electrically mate and demate the spacecraft to subsystem module interfaces to accomplish orbital operations. The results of Task 1 and Task 2 of the effort are presented. Task 1 involves the definition of the functional, operational, and environmental requirements for the connector system to support the leading prototype candidate concepts. Task 2 involves the documentation review and survey of available existing connector designs.

  17. 48 CFR 731.205-71 - Salary supplements for Host Government employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 731.205-71 Salary supplements for Host Government employees. (a... Contracting Officer shall provide written approval to the contractor in order for such costs to be eligible...

  18. 48 CFR 243.205-70 - Pricing of contract modifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pricing of contract modifications. 243.205-70 Section 243.205-70 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205-70...

  19. PROBABILISTIC PROGRAMMING FOR ADVANCED MACHINE LEARNING (PPAML) DISCRIMINATIVE LEARNING FOR GENERATIVE TASKS (DILIGENT)

    DTIC Science & Technology

    2017-11-29

    Structural connections of the frames (fragments) in the knowledge. We call the fundamental elements of the knowledge a limited number of elements...the result of contracted fundamental research deemed exempt from public affairs security and policy review in accordance with SAF/AQR memorandum dated...AVAILABILITY STATEMENT Approved for Public Release; Distribution Unlimited. This report is the result of contracted fundamental research deemed exempt from

  20. From Relational Interfaces to Assume-Guarantee Contracts

    DTIC Science & Technology

    2014-03-18

    Electrical Engineering and Computer Sciences University of California at Berkeley Technical Report No. UCB/EECS-2014-21 http://www.eecs.berkeley.edu/Pubs...5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) University of California at Berkeley, Electrical Engineering...design,” in EMSOFT’01. Springer, LNCS 2211, 2001. [2] A. Sangiovanni-Vincentelli et al., “Taming Dr. Frankenstein : Contract-Based Design for Cyber

  1. Computer assisted generation of the matrix elements between contracted wavefunctions in a Complete Active Space scheme

    NASA Astrophysics Data System (ADS)

    Angeli, C.; Cimiraglia, R.

    2005-02-01

    Starting from a CAS-SCF calculation a sequence of contracted functions can be generated by applying strings of spin-traced replacement operators to the CAS-SCF solution. The laborious task of producing the Hamiltonian matrix elements between such functions can be substantially reduced making use of a computer algebra system. An implementation employing the MuPAD system is presented and illustrated.

  2. Life as a NATO Engineer

    DTIC Science & Technology

    2010-08-01

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...management; leads military in case of specialized survey; supervises more than 25 local civilian employees ; acts as technical expert during contract...Security Assistance Force Head- quarters Camp. I knew I could handle the job of project manager, but wondered about acting as contract manager, technical ex

  3. Development of Powder Processing Models and Techniques for Meso-scale Devices: Perspirable Skin

    DTIC Science & Technology

    2008-03-31

    of Powder Processing Models and Techniques for Meso-scale Devices: Perspirable Skin Contract Number ...Skin 5a. CONTRACT NUMBER 5b. GRANT NUMBER FA9550-05-1-0202 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Patrick Kwon, Michigan State University 5d...PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Patrick Kwon Department of

  4. Development of the PARVMEC Code for Rapid Analysis of 3D MHD Equilibrium

    NASA Astrophysics Data System (ADS)

    Seal, Sudip; Hirshman, Steven; Cianciosa, Mark; Wingen, Andreas; Unterberg, Ezekiel; Wilcox, Robert; ORNL Collaboration

    2015-11-01

    The VMEC three-dimensional (3D) MHD equilibrium has been used extensively for designing stellarator experiments and analyzing experimental data in such strongly 3D systems. Recent applications of VMEC include 2D systems such as tokamaks (in particular, the D3D experiment), where application of very small (delB/B ~ 10-3) 3D resonant magnetic field perturbations render the underlying assumption of axisymmetry invalid. In order to facilitate the rapid analysis of such equilibria (for example, for reconstruction purposes), we have undertaken the task of parallelizing the VMEC code (PARVMEC) to produce a scalable and temporally rapidly convergent equilibrium code for use on parallel distributed memory platforms. The parallelization task naturally splits into three distinct parts 1) radial surfaces in the fixed-boundary part of the calculation; 2) two 2D angular meshes needed to compute the Green's function integrals over the plasma boundary for the free-boundary part of the code; and 3) block tridiagonal matrix needed to compute the full (3D) pre-conditioner near the final equilibrium state. Preliminary results show that scalability is achieved for tasks 1 and 3, with task 2 still nearing completion. The impact of this work on the rapid reconstruction of D3D plasmas using PARVMEC in the V3FIT code will be discussed. Work supported by U.S. DOE under Contract DE-AC05-00OR22725 with UT-Battelle, LLC.

  5. 29 CFR 6.18 - Consent findings and order.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Consent findings and order. 6.18 Section 6.18 Labor Office... Contracts Subject to the Service Contract Act) § 6.18 Consent findings and order. (a) At any time prior to... of the decision of the Administrative Law Judge, the parties may enter into consent findings and an...

  6. 77 FR 62280 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... execution fee for Priority Customer \\3\\ orders, from $0.18 per contract to $0.20 per contract, in certain... also proposes to increase the fee for Crossing Orders \\5\\ for Priority Customers in Singly Listed... to standardize the fees charged to Priority Customer orders in Singly Listed Symbols with the fees...

  7. 78 FR 62891 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Order Granting Approval to Proposed Rule...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... the Discontinuation of the Differentiation of Price Improvement XL Orders of Less Than 50 Contracts... different treatment of orders of less than 50 contracts entered into Phlx's Price Improvement XL auction.... Description of the Proposal Phlx Rule 1080(n) provides a price improvement mechanism in which a member (an...

  8. 48 CFR 813.302 - Purchase orders.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Purchase orders. 813.302 Section 813.302 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Simplified Acquisition Methods 813.302 Purchase...

  9. Differences of muscle co-contraction of the ankle joint between young and elderly adults during dynamic postural control at different speeds.

    PubMed

    Iwamoto, Yoshitaka; Takahashi, Makoto; Shinkoda, Koichi

    2017-08-02

    Agonist and antagonist muscle co-contractions during motor tasks are greater in the elderly than in young adults. During normal walking, muscle co-contraction increases with gait speed in young adults, but not in elderly adults. However, no study has compared the effects of speed on muscle co-contraction of the ankle joint during dynamic postural control in young and elderly adults. We compared muscle co-contractions of the ankle joint between young and elderly subjects during a functional stability boundary test at different speeds. Fifteen young adults and 16 community-dwelling elderly adults participated in this study. The task was functional stability boundary tests at different speeds (preferred and fast). Electromyographic evaluations of the tibialis anterior and soleus were recorded. The muscle co-contraction was evaluated using the co-contraction index (CI). There were no statistically significant differences in the postural sway parameters between the two age groups. Elderly subjects showed larger CI in both speed conditions than did the young subjects. CI was higher in the fast speed condition than in the preferred speed condition in the young subjects, but there was no difference in the elderly subjects. Moreover, after dividing the analytical range into phases (acceleration and deceleration phases), the CI was larger in the deceleration phase than in the acceleration phase in both groups, except for the young subjects in the fast speed conditions. Our results showed a greater muscle co-contraction of the ankle joint during dynamic postural control in elderly subjects than in young subjects not only in the preferred speed condition but also in the fast speed condition. In addition, the young subjects showed increased muscle co-contraction in the fast speed condition compared with that in the preferred speed condition; however, the elderly subjects showed no significant difference in muscle co-contraction between the two speed conditions. This indicates that fast movements cause different influences on dynamic postural control in elderly people, particularly from the point of view of muscle activation. These findings highlight the differences in the speed effects on muscle co-contraction of the ankle joint during dynamic postural control between the two age groups.

  10. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystem Concepts. Volume 1; Executive Summary

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The Alternate Propulsion Subsystem Concepts contract had seven tasks defined that are reported under this contract deliverable. The tasks were: FAA Restart Study, J-2S Restart Study, Propulsion Database Development. SSME Upper Stage Use. CERs for Liquid Propellant Rocket Engines. Advanced Low Cost Engines, and Tripropellant Comparison Study. The two restart studies, F-1A and J-2S, generated program plans for restarting production of each engine. Special emphasis was placed on determining changes to individual parts due to obsolete materials, changes in OSHA and environmental concerns, new processes available, and any configuration changes to the engines. The Propulsion Database Development task developed a database structure and format which is easy to use and modify while also being comprehensive in the level of detail available. The database structure included extensive engine information and allows for parametric data generation for conceptual engine concepts. The SSME Upper Stage Use task examined the changes needed or desirable to use the SSME as an upper stage engine both in a second stage and in a translunar injection stage. The CERs for Liquid Engines task developed qualitative parametric cost estimating relationships at the engine and major subassembly level for estimating development and production costs of chemical propulsion liquid rocket engines. The Advanced Low Cost Engines task examined propulsion systems for SSTO applications including engine concept definition, mission analysis. trade studies. operating point selection, turbomachinery alternatives, life cycle cost, weight definition. and point design conceptual drawings and component design. The task concentrated on bipropellant engines, but also examined tripropellant engines. The Tripropellant Comparison Study task provided an unambiguous comparison among various tripropellant implementation approaches and cycle choices, and then compared them to similarly designed bipropellant engines in the SSTO mission This volume overviews each of the tasks giving its objectives, main results. and conclusions. More detailed Final Task Reports are available on each individual task.

  11. No interpretation without representation: the role of domain-specific representations and inferences in the Wason selection task.

    PubMed

    Fiddick, L; Cosmides, L; Tooby, J

    2000-10-16

    The Wason selection task is a tool used to study reasoning about conditional rules. Performance on this task changes systematically when one varies its content, and these content effects have been used to argue that the human cognitive architecture contains a number of domain-specific representation and inference systems, such as social contract algorithms and hazard management systems. Recently, however, Sperber, Cara & Girotto (Sperber, D., Cara, F., & Girotto, V. (1995). Relevance theory explains the selection task. Cognition, 57, 31-95) have proposed that relevance theory can explain performance on the selection task - including all content effects - without invoking inference systems that are content-specialized. Herein, we show that relevance theory alone cannot explain a variety of content effects - effects that were predicted in advance and are parsimoniously explained by theories that invoke domain-specific algorithms for representing and making inferences about (i) social contracts and (ii) reducing risk in hazardous situations. Moreover, although Sperber et al. (1995) were able to use relevance theory to produce some new content effects in other domains, they conducted no experiments involving social exchanges or precautions, and so were unable to determine which - content-specialized algorithms or relevance effects - dominate reasoning when the two conflict. When experiments, reported herein, are constructed so that the different theories predict divergent outcomes, the results support the predictions of social contract theory and hazard management theory, indicating that these inference systems override content-general relevance factors. The fact that social contract and hazard management algorithms provide better explanations for performance in their respective domains does not mean that the content-general logical procedures posited by relevance theory do not exist, or that relevance effects never occur. It does mean, however, that one needs a principled way of explaining which effects will dominate when a set of inputs activate more than one reasoning system. We propose the principle of pre-emptive specificity - that the human cognitive architecture should be designed so that more specialized inference systems pre-empt more general ones whenever the stimuli centrally fit the input conditions of the more specialized system. This principle follows from evolutionary and computational considerations that are common to both relevance theory and the ecological rationality approach.

  12. Unintended activity in homologous muscle during intended unilateral contractions increases with greater task difficulty.

    PubMed

    Watanabe, Hironori; Kanehisa, Hiroaki; Yoshitake, Yasuhide

    2017-10-01

    The present study aimed to examine (1) the effect of task difficulty on unintended muscle activation (UIMA) levels in contralateral homologous muscle, (2) the difference between young and old adults in degree of UIMA with respect to task difficulty, and (3) temporal correlations between intended and contralateral unintended muscle activity at low frequency during unilateral intended force-matching tasks. Twelve young (21.8 ± 2.4 years) and twelve old (69.9 ± 5.3 years) adult men performed steady isometric abductions with the left index finger at 20-80% of maximal voluntary contraction force. Two task difficulties were set by adjusting the spacing between two bars centered about the target force used for visual feedback on a monitor. The amplitude of surface electromyogram (aEMG) for both hands was calculated and normalized with respect to the maximal value. To determine if oscillations between intended and unintended muscle activities were correlated, cross-correlation function (CCF) of rectified EMG for both hands at low frequency was calculated for samples deemed adequate. The unintended aEMG (right hand) had significant main effects in task difficulty, age, and target force (all P < 0.05) without any interactions. Distinct significant peaks in CCF (0.38 on average, P < 0.05) with small time lags were present between rectified EMGs of intended and unintended muscles in 14 of the 17 samples. The current results indicate that UIMA increases with greater task difficulty regardless of age, and temporal correlations exist between intended and contralateral unintended muscle activities at low frequency.

  13. 77 FR 1548 - Interagency Task Force on Veterans Small Business Development

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... capital (loans, surety bonding and franchising); (2) Ensure achievement of pre-established contracting... administrative burdens in accessing business development and entrepreneurship opportunities; (5) Increasing and...

  14. 77 FR 22056 - Interagency Task Force on Veterans Small Business Development

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... capital (loans, surety bonding, and franchising); (2) Ensure achievement of pre-established contracting... administrative burdens in accessing business development and entrepreneurship opportunities; (5) Increasing and...

  15. 78 FR 59076 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... contracts (Rule 1057) and PHLX FOREX option contracts (Rules 1000C-1009C). Standard expiration contracts... apply only to series of option contracts opened for trading after the effective date of the OCC rule... trading of options in order to change the expiration date for most option contracts to the third Friday of...

  16. Water Processor and Oxygen Generation Assembly

    NASA Technical Reports Server (NTRS)

    Bedard, John

    1997-01-01

    This report documents the results of the tasks which initiated efforts on design issues relating to the Water Processor (WP) and the Oxygen Generation Assembly (OGA) Flight Hardware for the International Space Station. This report fulfills the Statement of Work deliverables requirement for contract H-29387D. The following lists the tasks required by contract H-29387D: (1) HSSSI shall coordinate a detailed review of WP/OGA Flight Hardware program requirements with personnel from MSFC to identify requirements that can be eliminated without affecting the technical integrity of the WP/OGA Hardware; (2) HSSSI shall conduct the technical interchanges with personnel from MSFC to resolve design issues related to WP/OGA Flight Hardware; (3) HSSSI will initiate discussions with Zellwegger Analytics, Inc. to address design issues related to WP and PCWQM interfaces.

  17. 48 CFR 215.470 - Estimated data prices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Estimated data prices. 215..., DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.470 Estimated data prices. (a) DoD requires estimates of the prices of data in order to evaluate the...

  18. 48 CFR 215.470 - Estimated data prices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Estimated data prices. 215..., DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.470 Estimated data prices. (a) DoD requires estimates of the prices of data in order to evaluate the...

  19. 48 CFR 215.470 - Estimated data prices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Estimated data prices. 215..., DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.470 Estimated data prices. (a) DoD requires estimates of the prices of data in order to evaluate the...

  20. 75 FR 20649 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Order Granting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ..., stock index futures contracts, options on futures, options on securities and indexes, equity caps... holding and/ or managing portfolios or baskets of securities, commodity futures contracts, options on commodity futures contracts, swaps, forward contracts and/or options on physical commodities and/or non-U.S...

  1. 12 CFR 380.53 - Repudiation of secured contract.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... POLICY ORDERLY LIQUIDATION AUTHORITY Receivership Administrative Claims Process § 380.53 Repudiation of secured contract. To the extent that a contract to which a covered financial company is a party is secured by property of the covered financial company, the repudiation of the contract by the Corporation as...

  2. 12 CFR 380.53 - Repudiation of secured contract.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... POLICY ORDERLY LIQUIDATION AUTHORITY Receivership Administrative Claims Process § 380.53 Repudiation of secured contract. To the extent that a contract to which a covered financial company is a party is secured by property of the covered financial company, the repudiation of the contract by the Corporation as...

  3. 48 CFR 304.604 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...), Public Law (Pub. L.) 109-282, HHS acquisition officials and staff must report their contract information... effective HHS-wide ICAR data verification and validation program; and (ii) Identifying cross-cutting trends... reportable contracts and orders, including BPA orders and modifications thereto, are reported; (2) Review and...

  4. 48 CFR 304.604 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...), Public Law (Pub. L.) 109-282, HHS acquisition officials and staff must report their contract information... effective HHS-wide ICAR data verification and validation program; and (ii) Identifying cross-cutting trends... reportable contracts and orders, including BPA orders and modifications thereto, are reported; (2) Review and...

  5. 48 CFR 304.604 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...), Public Law (Pub. L.) 109-282, HHS acquisition officials and staff must report their contract information... effective HHS-wide ICAR data verification and validation program; and (ii) Identifying cross-cutting trends... reportable contracts and orders, including BPA orders and modifications thereto, are reported; (2) Review and...

  6. 48 CFR 304.604 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...), Public Law (Pub. L.) 109-282, HHS acquisition officials and staff must report their contract information... effective HHS-wide ICAR data verification and validation program; and (ii) Identifying cross-cutting trends... reportable contracts and orders, including BPA orders and modifications thereto, are reported; (2) Review and...

  7. 48 CFR 304.604 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...), Public Law (Pub. L.) 109-282, HHS acquisition officials and staff must report their contract information... effective HHS-wide ICAR data verification and validation program; and (ii) Identifying cross-cutting trends... reportable contracts and orders, including BPA orders and modifications thereto, are reported; (2) Review and...

  8. 48 CFR 243.204 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Administration. 243.204... OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204 Administration. Follow the procedures at PGI 243.204 for administration of change orders. [75 FR 48277, Aug. 10, 2010] ...

  9. 48 CFR 243.204 - Administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Administration. 243.204... OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204 Administration. Follow the procedures at PGI 243.204 for administration of change orders. [75 FR 48277, Aug. 10, 2010] ...

  10. 48 CFR 243.204 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Administration. 243.204... OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204 Administration. Follow the procedures at PGI 243.204 for administration of change orders. [75 FR 48277, Aug. 10, 2010] ...

  11. 48 CFR 243.204 - Administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Administration. 243.204... OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204 Administration. Follow the procedures at PGI 243.204 for administration of change orders. [75 FR 48277, Aug. 10, 2010] ...

  12. 48 CFR 243.204 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Administration. 243.204... OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204 Administration. Follow the procedures at PGI 243.204 for administration of change orders. [75 FR 48277, Aug. 10, 2010] ...

  13. Principles of Training in Marine Corps Task Analysis. Training Manual 1

    DTIC Science & Technology

    1975-12-01

    Training Research Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370 Approved for...and Training Research Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370 Approved... psychological reward; the trainee loses the connection between performance and the pat on the back that is its consequence. DIMENSIONS OF THE TRAINING

  14. Guidelines for Research Planning and Design in Task Analysis

    DTIC Science & Technology

    1975-09-01

    Personnel and Training Research Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370...Programs Psychological Sciences Division Office of Naval Research Contract No. N00014-74-A-0436-0001 NR 151-370 Approved for public release...for ways in which the hypothesis can be tested . There are 11 several ways to do this and they are often used jointly. 1* Review of the Literature

  15. Multibeam Formation with a Parametric Sonar

    DTIC Science & Technology

    1976-03-05

    AD-A022 815 MULTIBEAM FORMATION WITH A PARAMETRIC SONAR Robert L. White Texas University at Austin Prepared for: Office of Naval Research 5 March...PARAMETRIC SONAR Final Report under Contract N00014-70-A-0166, Task 0020 1 February - 31 July 1974 Robe&, L. White OFFICE OF NAVAL RESEARCH Contract N00014...78712 APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED. r-X: ~ ... ABSTRACT Parametric sonar has proven to be an effective concept in sonar

  16. The psychological contract: enhancing productivity and its implications for long-term care.

    PubMed

    Flannery, Raymond B

    2002-01-01

    When hired, a new employee is usually given a job description and an explanation of benefits. In addition, the employee will also have a psychological contract with the organization. This contract, often unstated, reflects the main source of the employee's motivation to work hard. This is true of all groups of employees, including long-term care staff. Common examples of psychological contracts for long-term care administrative staff include autonomy, social acceptance, and being in the forefront of cutting-edge research. An awareness of these psychological contracts can result in better "fits" between employee aspirations and relevant long-term care organization tasks so that productivity is enhanced. This article outlines the steps necessary to create these good fits in ways that benefit both the organization and its employees. These recommendations are of particular relevance to administrators and supervisors in long-term carefacilities.

  17. Asymmetric activation of motor cortex controlling human anterior digastric muscles during speech and target-directed jaw movements.

    PubMed

    Sowman, Paul F; Flavel, Stanley C; McShane, Christie L; Sakuma, Shigemitsu; Miles, Timothy S; Nordstrom, Michael A

    2009-07-01

    Like most of the cranial muscles involved in speech, the trigeminally innervated anterior digastric muscles are controlled by descending corticobulbar projections from the primary motor cortex (M1) of each hemisphere. We hypothesized that changes in corticobulbar M1 excitability during speech production would show a hemispheric asymmetry favoring the left side, which is the dominant hemisphere for language processing in most strongly right handed subjects. Fifteen volunteers aged 24.5+/-5.3 (SD) yr participated. All subjects were strongly right handed as reported by questionnaire. A surface electromyograph (EMG) was recorded bilaterally from digastrics and jaw movement detected by an accelerometer attached to a lower incisor. Focal transcranial magnetic stimulation (TMS) was used to assess corticomotor excitability of the digastric representation in M1 of both hemispheres during four tasks: 1) static isometric contraction of digastrics; 2) speaking a single word; 3) visually guided, nonspeech jaw movement that matched the jaw kinematics recorded during task 2; and 4) reciting a sentence. Background EMG was well matched in all tasks and jaw kinematics were similar around the time of the TMS pulse for tasks 2-4. TMS resting thresholds and digastric muscle-evoked potential (MEP) size during isometric contraction did not differ for TMS over left versus right M1. MEPs elicited by TMS over left, but not right M1 increased in size during speech and nonspeech jaw movement compared with isometric contraction. We conclude that left corticobulbar M1 is preferentially engaged for descending control of digastric muscles during speech and the performance of a rapid jaw movement to match a target kinematic profile.

  18. 48 CFR 819.7004 - Contracting Order of Priority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contracting Order of Priority. 819.7004 Section 819.7004 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Service-Disabled Veteran-Owned and Veteran-Owned Small Business...

  19. 48 CFR 819.7004 - Contracting Order of Priority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Contracting Order of Priority. 819.7004 Section 819.7004 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Service-Disabled Veteran-Owned and Veteran-Owned Small Business...

  20. 48 CFR 243.204-70-3 - Definitization schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-3 Definitization schedule. (a) Unpriced change orders shall contain definitization schedules that provide for definitization by the earlier of— (1) The date that is 180 days after issuance of the change...

  1. 48 CFR 243.204-70-3 - Definitization schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-3 Definitization schedule. (a) Unpriced change orders shall contain definitization schedules that provide for definitization by the earlier of— (1) The date that is 180 days after issuance of the change...

  2. Factor and Organizational Substitutions to Minimize Costs in the Navy

    DTIC Science & Technology

    2013-12-01

    navigation, propulsion, combat, hotel , communications, in-service support and any system corresponding to further tasks such as transport, hospital...propulsion, combat, hotel , communications, in-service support and any system corresponding to further tasks such as transport, hospital services and command...contract, a cadet may be able to increase her branch choice priority. The Officer Career Satisfaction Program (OCSP) is an incentive program with

  3. An Innovative 6-DOF Platform for Testing a Space Robotic System to Perform Contact Tasks in Zero-Gravity Environment

    DTIC Science & Technology

    2013-10-21

    Platform for Testing a Space Robotic System to Perform Contact Tasks in Zero- Gravity Environment 5a. CONTRACT NUMBER FA9453-11-1-0306 5b...SUBJECT TERMS Microgravity, zero gravity , test platform, simulation, gravity offloading 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT...4  3.3  Principle of Gravity Offloading

  4. NetView technical research

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.

  5. Engineering, technical, and management support services

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report summarizes by task the engineering, technical, and management support services provided by Vitro Corporation to NASA Headquarters Office of Safety, Reliability, Maintainability, and Quality Assurance (now called Office of Safety and Mission Assurance (OSMA)) (Code Q) under Contract Number NASW-4311 from the period February 10, 1994. Each task summary includes significant Vitro accomplishments, conclusions, and recommendations for future efforts in each of the divisions within OSMA.

  6. Contracting-out in the United Kingdom: a partnership between social security and private pension plans.

    PubMed

    Daykin, Chris

    2002-01-01

    Contracting-out was introduced in the United Kingdom in 1978 as part of the arrangements for the State Earnings-Related Pension Scheme (SERPS) in order to avoid duplication with the existing well-developed defined benefit occupational pension plan sector. Members and sponsors of contracted-out schemes were able to save on their social security contributions in recognition of the fact that they were accruing equivalent benefits through an occupational pension plan. Later on this concept was extended to those with individual money purchase pension plans. This article considers a brief history of contracting-out, the principles of contracting-out, some problems associated with contracting-out, the implications of the introduction of stakeholder pensions and State Second Pension, and the latest rebate review and rebate orders. It examines how U.K. pensions policy since 1978 has been based on a partnership between social security and private pension plans.

  7. 75 FR 32122 - Revisions to Defense Priorities and Allocations System Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ...This proposed rule would reorganize and clarify existing standards and procedures by which the Bureau of Industry and Security (BIS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which BIS may allocate materials, services and facilities to promote the national defense. BIS is publishing this rule to comply with a requirement of the Defense Production Act Reauthorization of 2009 to publish regulations providing standards and procedures for prioritization of contracts and orders and for allocation of materials, services and facilities to promote the national defense.

  8. 17 CFR 15.05 - Designation of agent for foreign persons.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... futures contract or option contract; and the term “communication” means any summons, complaint, order... correspondence. (b) Any futures commission merchant who makes or causes to be made any futures contract or option... futures or option contracts which are or have been maintained in such accounts carried by the futures...

  9. 75 FR 40005 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Order Granting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... including, but not limited to, stock index futures contracts, options on futures, options on securities and... holding and/ or managing portfolios or baskets of securities, commodity futures contracts, options on commodity futures contracts, swaps, forward contracts and/or options on physical commodities and/or non-U.S...

  10. 76 FR 71465 - Defense Federal Acquisition Regulations Supplement; Notification Requirements for Awards of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Procurement (Contract Policy and International Contracting), OUSD (AT&L) DPAP (CPIC), 3060 Defense Pentagon... International Contracting (CPIC). This enables a single office to oversee and manage the DoD-wide use of single... Delivery-Order Contracts (DFARS Case 2009-D036) AGENCY: Defense Acquisition Regulations System, Department...

  11. 13 CFR 127.503 - When is a contracting officer authorized to restrict competition under this part?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SMALL BUSINESS ADMINISTRATION WOMEN-OWNED SMALL BUSINESS FEDERAL CONTRACT PROGRAM Federal Contract..., anticipated award price, and the acquisition history, will be considered in making a decision as to which... orders issued pursuant to the contract, from that point forward, towards its women-owned small business...

  12. 48 CFR 1843.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1843.205 Contract clauses. As authorized in the prefaces of clauses FAR 52.243-1, Changes—Fixed Price; FAR 52.243-2, Changes—Cost Reimbursement; and FAR 52.243-4, Changes; and in the prescription at 43.205(c) for FAR 52.243-3, Changes—Time-and-Material or...

  13. Modality independence of order coding in working memory: Evidence from cross-modal order interference at recall.

    PubMed

    Vandierendonck, André

    2016-01-01

    Working memory researchers do not agree on whether order in serial recall is encoded by dedicated modality-specific systems or by a more general modality-independent system. Although previous research supports the existence of autonomous modality-specific systems, it has been shown that serial recognition memory is prone to cross-modal order interference by concurrent tasks. The present study used a serial recall task, which was performed in a single-task condition and in a dual-task condition with an embedded memory task in the retention interval. The modality of the serial task was either verbal or visuospatial, and the embedded tasks were in the other modality and required either serial or item recall. Care was taken to avoid modality overlaps during presentation and recall. In Experiment 1, visuospatial but not verbal serial recall was more impaired when the embedded task was an order than when it was an item task. Using a more difficult verbal serial recall task, verbal serial recall was also more impaired by another order recall task in Experiment 2. These findings are consistent with the hypothesis of modality-independent order coding. The implications for views on short-term recall and the multicomponent view of working memory are discussed.

  14. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 2

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The Alternate Propulsion Subsystem Concepts contract had five tasks defined for the first year. The tasks were: F-1A Restart Study, J-2S Restart Study, Propulsion Database Development, Space Shuttle Main Engine (SSME) Upper Stage Use, and CER's for Liquid Propellant Rocket Engines. The detailed study results, with the data to support the conclusions from various analyses, are being reported as a series of five separate Final Task Reports. Consequently, this volume only reports the required programmatic information concerning Computer Aided Design Documentation, and New Technology Reports. A detailed Executive Summary, covering all the tasks, is also available as Volume 1.

  15. A Measure of Search Efficiency in a Real World Search Task (PREPRINT)

    DTIC Science & Technology

    2009-02-16

    Search Task 5a. CONTRACT NUMBER N00173-08-1-G030 5b. GRANT NUMBER NRL BAA 08-09, 55-07-01 5c. PROGRAM ELEMENT NUMBER 0602782N 6. AUTHOR(S... Beck , Melissa R. Ph.D (LSU) Maura C. Lohrenz (NRL Code 7440.1) J. Gregory Trafton (NRL Code 5515) 5d. PROJECT NUMBER 08294 5e. TASK NUMBER... Beck 19b. TELEPHONE NUMBER (Include area code) (225)578-7214 Standard Form 298 (Rev. 8/98) Prescribed by ANSI Std. Z39.18 A measure of search

  16. Design, engineering and evaluation of refractory liners for slagging gasifiers. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    deTineo, B J; Booth, G; Firestone, R F

    1982-08-01

    The contract for this program was awarded at the end of September 1978. Work was started on 1 October 1978, on Tasks A, B, and E. Task A, Conceptual Liner Designs, and Task B, Test System Design and Construction, were completed. Task C, Liner Tests, and Task D, Liner Design Evaluation, were to begin upon completion of Task B. Task E, Liner Model Development, is inactive after an initial data compilation and theoretical model development effort. It was to be activated as soon as data were available from Task D. Task F, Liner Design Handbook, was active along with Taskmore » A since the reports of both tasks were to use the same format. At this time, Tasks C, D, and F are not to be completed since funding of this project was phased out by DOE directive. The refractory text facility, which was constructed, was tested and found to perform satisfactorily. It is described in detail, including a hazard analysis which was performed. (LTN)« less

  17. 41 CFR 101-26.305 - Submission of orders to GSA.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Submission of orders to GSA. 101-26.305 Section 101-26.305 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  18. 41 CFR 101-6.213-6 - Content of orders.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Content of orders. 101-6.213-6 Section 101-6.213-6 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 6-MISCELLANEOUS REGULATIONS 6.2...

  19. Cortical and Spinal Mechanisms of Task Failure of Sustained Submaximal Fatiguing Contractions

    PubMed Central

    Williams, Petra S.; Hoffman, Richard L.; Clark, Brian C.

    2014-01-01

    In this and the subsequent companion paper, results are presented that collectively seek to delineate the contribution that supraspinal circuits have in determining the time to task failure (TTF) of sustained submaximal contractions. The purpose of this study was to compare adjustments in supraspinal and spinal excitability taken concurrently throughout the performance of two different fatigue tasks with identical mechanical demands but different TTF (i.e., force-matching and position-matching tasks). On separate visits, ten healthy volunteers performed the force-matching or position-matching task at 15% of maximum strength with the elbow flexors to task failure. Single-pulse transcranial magnetic stimulation (TMS), paired-pulse TMS, paired cortico-cervicomedullary stimulation, and brachial plexus electrical stimulation were delivered in a 6-stimuli sequence at baseline and every 2–3 minutes throughout fatigue-task performance. Contrary to expectations, the force-matching task TTF was 42% shorter (17.5±7.9 min) than the position-matching task (26.9±15.11 min; p<0.01); however, both tasks caused the same amount of muscle fatigue (p = 0.59). There were no task-specific differences for the total amount or rate of change in the neurophysiologic outcome variables over time (p>0.05). Therefore, failure occurred after a similar mean decline in motorneuron excitability developed (p<0.02, ES = 0.35–0.52) coupled with a similar mean increase in measures of corticospinal excitability (p<0.03, ES = 0.30–0.41). Additionally, the amount of intracortical inhibition decreased (p<0.03, ES = 0.32) and the amount of intracortical facilitation (p>0.10) and an index of upstream excitation of the motor cortex remained constant (p>0.40). Together, these results suggest that as fatigue develops prior to task failure, the increase in corticospinal excitability observed in relationship to the decrease in spinal excitability results from a combination of decreasing intracortical inhibition with constant levels of intracortical facilitation and upstream excitability that together eventually fail to provide the input to the motor cortex necessary for descending drive to overcome the spinal cord resistance, thereby contributing to task failure. PMID:24667484

  20. Electronic Data Interchange in Procurement

    DTIC Science & Technology

    1990-04-01

    contract management and order processing systems. This conversion of automated information to paper and back to automated form is not only slow and...automated purchasing computer and the contractor’s order processing computer through telephone lines, as illustrated in Figure 1-1. Computer-to-computer...into the contractor’s order processing or contract management system. This approach - converting automated information to paper and back to automated

Top