Sample records for tdb project tdb

  1. Engineering of an inhalable DDA/TDB liposomal adjuvant: a quality-by-design approach towards optimization of the spray drying process.

    PubMed

    Ingvarsson, Pall Thor; Yang, Mingshi; Mulvad, Helle; Nielsen, Hanne Mørck; Rantanen, Jukka; Foged, Camilla

    2013-11-01

    The purpose of this study was to identify and optimize spray drying parameters of importance for the design of an inhalable powder formulation of a cationic liposomal adjuvant composed of dimethyldioctadecylammonium (DDA) bromide and trehalose-6,6'-dibehenate (TDB). A quality by design (QbD) approach was applied to identify and link critical process parameters (CPPs) of the spray drying process to critical quality attributes (CQAs) using risk assessment and design of experiments (DoE), followed by identification of an optimal operating space (OOS). A central composite face-centered design was carried out followed by multiple linear regression analysis. Four CQAs were identified; the mass median aerodynamic diameter (MMAD), the liposome stability (size) during processing, the moisture content and the yield. Five CPPs (drying airflow, feed flow rate, feedstock concentration, atomizing airflow and outlet temperature) were identified and tested in a systematic way. The MMAD and the yield were successfully modeled. For the liposome size stability, the ratio between the size after and before spray drying was modeled successfully. The model for the residual moisture content was poor, although, the moisture content was below 3% in the entire design space. Finally, the OOS was drafted from the constructed models for the spray drying of trehalose stabilized DDA/TDB liposomes. The QbD approach for the spray drying process should include a careful consideration of the quality target product profile. This approach implementing risk assessment and DoE was successfully applied to optimize the spray drying of an inhalable DDA/TDB liposomal adjuvant designed for pulmonary vaccination.

  2. Formulation in DDA-MPLA-TDB Liposome Enhances the Immunogenicity and Protective Efficacy of a DNA Vaccine against Mycobacterium tuberculosis Infection

    PubMed Central

    Tian, Maopeng; Zhou, Zijie; Tan, Songwei; Fan, Xionglin; Li, Longmeng; Ullah, Nadeem

    2018-01-01

    Despite the vaccine Mycobacterium bovis Bacillus Calmette–Guérin is used worldwide, tuberculosis (TB) remains the first killer among infectious diseases. An effective vaccine is urgently required. DNA vaccine has shown prophylactic as well as therapeutic effects against TB, while its weak immunogenicity hinders the application. As a strong inducer of Th1-biased immune response, DMT, consisting of dimethyldioctadecylammonium (DDA) and two pattern recognition receptor agonists monophosphoryl lipid A and trehalose 6,6′-dibehenate (TDB), was a newly developed liposomal adjuvant. To elucidate the action mechanism of DMT and improve immunological effects induced by DNA vaccine, a new recombinant eukaryotic expression plasmid pCMFO that secretes the fusion of four multistage antigens (Rv2875, Rv3044, Rv2073c, and Rv0577) of Mycobacterium tuberculosis was constructed. pCMFO/DDA and pCMFO/DMT complexes were then prepared and their physicochemical properties were analyzed. The immunogenicity and protection against M. tuberculosis infection in vaccinated C57BL/6 mice were compared. Formulation of DNA and two agonists into the DDA liposome decreased zeta potential but increased the stability of storage, which resulted in a slower and longer-lasting release of DNA from the DNA–DMT complex than the DNA–DDA liposome. Besides Th1-biased responses, pCMFO/DMT vaccinated mice elicited more significantly CFMO-specific IL2+ TCM cell responses in the spleen and provided an enhanced and persistent protection against M. tuberculosis aerosol infection, compared to pCMFO/DDA and pCMFO groups. Therefore, the adjuvant DMT can release DNA and agonists slowly, which might attribute to the improved protection of DMT adjuvanted vaccines. pCMFO/DMT, a very promising TB vaccine, warrants for further preclinical and clinical trials. PMID:29535714

  3. 2000 JOURNAL ARTICLES FROM LRPCD (TREATMENT AND DESTRUCTION BRANCH, LAND REMEDIATION AND POLLUTION CONTROL DIVISION, NRMRL)

    EPA Science Inventory

    The Treatment and Destruction Branch (TDB) of NRMRL's Land Remediation and Pollution Control Division (LRPCD)produces and publishes highly specialized technical and scientific documents relating to TDB's research. TDB conducts bioremediation and physical/chemical treatment resear...

  4. 1997 JOURNAL ARTICLES FROM LRPCD (TREATMENT AND DESTRUCTION BRANCH, LAND REMEDIATION AND POLLUTION CONTROL DIVISION, NRMRL)

    EPA Science Inventory

    The Treatment and Destruction Branch (TDB) of NRMRL's Land Remediation and Pollution Control Division (LRPCD) produces and publishes highly technical and scientific documents relating to TDB's research. TDB conducts bioremediation and physical/chemical treatment research. The res...

  5. 1996 JOURNAL ARTICLES FROM LRPCD (TREATMENT AND DESTRUCTION BRANCH, LAND REMEDIATION AND POLLUTION CONTROL DIVISION, NRMRL)

    EPA Science Inventory

    The Treatment and Destruction Branch (TDB) of NRMRL's Land Remediation and Pollution Control Division (LRPCD) produces and publishes highly technical and scientific articles relating to TDB's research. TDB conducts bioremediation and physical/chemical treatment research. The rese...

  6. 1998 JOURNAL ARTICLES FROM LRPCD (TREATMENT AND DESTRUCTION BRANCH, LAND REMEDIATION AND POLLUTION CONTROL DIVISION, NRMRL)

    EPA Science Inventory

    The Treatment and Destruction Branch (TDB) of NRMRL's Land Remediation and Pollution Control Division (LRPCD) produces and publishes highly technical and scientific documents relating to TDB's research. TDB conducts bioremediation and physical/chemical treatment research. The res...

  7. 1999 JOURNAL ARTICLES FROM LRPCD (TREATMENT AND DESTRUCTION BRANCH, LAND REMEDIATION AND POLLUTION CONTROL DIVISION, NRMRL)

    EPA Science Inventory

    The Treatment and Destruction Branch (TDB) of NRMRL's Land Remediation and Pollution Control Division (LRPCD) produces and publishes highly technical and scientific documents relating to TDB's research. TDB conducts bioremediation and physical/chemical treatment research. The res...

  8. THE DRINKING WATER TREATABILITY DATABASE (Slides)

    EPA Science Inventory

    The Drinking Water Treatability Database (TDB) assembles referenced data on the control of contaminants in drinking water, housed on an interactive, publicly-available, USEPA web site (www.epa.gov/tdb). The TDB is of use to drinking water utilities, treatment process design engin...

  9. THE DRINKING WATER TREATABILITY DATABASE (Conference Paper)

    EPA Science Inventory

    The Drinking Water Treatability Database (TDB) assembles referenced data on the control of contaminants in drinking water, housed on an interactive, publicly-available, USEPA web site (www.epa.gov/tdb). The TDB is of use to drinking water utilities, treatment process design engin...

  10. EPA Treatability Database Digs Deep for Data on Drinking Water Contaminants and Treatment Processes

    EPA Science Inventory

    The TDB is an interactive database that was initially developed in 2006-2007. The TDB currently contains more than 60 regulated and unregulated contaminants and 28 treatment processes that are known to be effective and are commonly employed at drinking water utilities. TDB lite...

  11. Inoculation of tannin-degrading bacteria into novel hosts increases performance on tannin-rich diets.

    PubMed

    Kohl, Kevin D; Stengel, Ashley; Dearing, M Denise

    2016-06-01

    It has been hypothesized that herbivores host tannin-degrading bacteria (TDB) to overcome the toxic challenges posed by plant tannins. While TDB have been isolated from the guts of numerous mammals, their functional significance to their hosts has never been explicitly tested. We introduced TDB into lab rats, which do not host TDB, and measured host performance on tannin-rich diets. We first isolated three species of TDB, Escherichia coli, Bacillus subtilis and Enterococcus faecalis, from the guts of the desert woodrat (Neotoma lepida), which regularly feeds on tannin-rich plants. Then, we inoculated isolated TDB, as well as full woodrat microbial communities into laboratory rats. A control group was inoculated with sterilized woodrat faeces. Recipient lab rats were fed increasing concentrations of tannic acid, and we monitored tannic acid intake, body mass and liver damage as measured by serum alanine aminotransferase activity. Lab rats given TDB as isolates or full communities exhibited increased tannic acid intake, higher maintenance of body mass and lower indicators of liver damage compared with control animals. These differences were maintained when the trial was repeated after 6 weeks of feeding on tannin-free diets. Our results are the first to demonstrate that TDB significantly increase host performance on tannin-rich diets. © 2015 Society for Applied Microbiology and John Wiley & Sons Ltd.

  12. [Blocking the spray of contaminants from patients' exhalent using a tracheal detecting bulb during endotracheal intubation].

    PubMed

    Tong, You-liang; Sun, Ming; Wang, Zhen; Li, Bin; Xie, Jue; Ye, Hui

    2011-11-01

    To examine the effect of a newly-developed tracheal detecting-bulb (TDB) in preventing the spray of contaminants in patients' exhalent during emergency endotracheal intubation procedure. 62 emergency patients (male or female, age 21-73 years, weight 47-83 kg, with different levels of consciousness and spontaneous breathing) were randomly divided into two groups (n =31 each) to receive endotracheal intubation by an anesthesiologist with more than 17 years of experience, with (TDB group) or without (control group) a TDB connected to the tracheal tubing. Records were taken regarding the patient's coughing, expansion / contraction of the TDB, the operator's feeling of the patient's exhalent on his face / neck and the contamination of these areas by blood / secretions from the patients in the due course. In TDB group, expansion / contraction of TDB occurred in all cases, but the operator felt no exhalent in any of them. In 9 cases the patients coughed but the operator was contaminated only in 2 cases. While in control group, the patients' exhalent was felt in 16 cases. Coughing were recorded in 7 cases, and the operator was contaminated in 11 cases. In comparison with the control group, TDB group had significantly lower(both P < 0.05), incidence in feeling the exhalent (0 vs. 16), and contamination by blood or secretions (2 vs. 11) although the two groups had no significant difference in the incidence of coughing (9 vs. 7, P > 0.05). TDB can play an important role in blocking the spray of contaminants in patients' exhalent during endotracheal intubation.

  13. Fundamentals of the NEA Thermochemical Database and its influence over national nuclear programs on the performance assessment of deep geological repositories.

    PubMed

    Ragoussi, Maria-Eleni; Costa, Davide

    2017-03-14

    For the last 30 years, the NEA Thermochemical Database (TDB) Project (www.oecd-nea.org/dbtdb/) has been developing a chemical thermodynamic database for elements relevant to the safety of radioactive waste repositories, providing data that are vital to support the geochemical modeling of such systems. The recommended data are selected on the basis of strict review procedures and are characterized by their consistency. The results of these efforts are freely available, and have become an international point of reference in the field. As a result, a number of important national initiatives with regard to waste management programs have used the NEA TDB as their basis, both in terms of recommended data and guidelines. In this article we describe the fundamentals and achievements of the project together with the characteristics of some databases developed in national nuclear waste disposal programs that have been influenced by the NEA TDB. We also give some insights on how this work could be seen as an approach to be used in broader areas of environmental interest. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Safety and efficacy of transdermal buprenorphine versus oral tramadol for the treatment of post-operative pain following surgery for fracture neck of femur: A prospective, randomised clinical study.

    PubMed

    Desai, Sameer N; Badiger, Santhoshi V; Tokur, Shreesha B; Naik, Prashanth A

    2017-03-01

    Transdermal buprenorphine, which is used in chronic pain management, has rarely been studied for use in acute pain management. The aim of this study was to compare the safety and efficacy of transdermal buprenorphine patch to oral tramadol for post-operative analgesia, following proximal femur surgeries. Fifty adult patients undergoing surgery for hip fracture under spinal anaesthesia were included in this study. One group (Group TDB) received transdermal buprenorphine 10 mcg/h patch applied a day before the surgery and other group received oral tramadol 50 mg three times a day for analgesia (Group OT). They were allowed to take diclofenac and paracetamol tablets for rescue analgesia. Pain scores at rest, on movement, rescue analgesic requirement and side effects were compared between the groups over 7 days. Chi-square and independent sample t -test were used for categorical and continuous variables, respectively. Resting pain scores and pain on movement were significantly lower in TDB Group on all 7 days starting from 24 h post-operatively. Rescue analgesic requirement was significantly lower in TDB Group compared to OT Group. All the patients needed rescue analgesic in OT Group whereas 68% of the patients needed the same in TDB Group. Incidence of vomiting was less and satisfaction scores were much higher in TDB Group as compared to OT Group (79% vs. 66%, P < 0.001). Transdermal buprenorphine can be safely used for post-operative analgesia and is more efficacious in reducing post-operative pain after 24 hours, with fewer side effects when compared to oral tramadol.

  15. Describing excited state relaxation and localization in TiO 2 nanoparticles using TD-DFT

    DOE PAGES

    Berardo, Enrico; Hu, Han -Shi; van Dam, Hubertus J. J.; ...

    2014-02-26

    We have investigated the description of excited state relaxation in naked and hydrated TiO 2 nanoparticles using Time-Dependent Density Functional Theory (TD-DFT) with three common hybrid exchange-correlation (XC) potentials; B3LYP, CAM-B3LYP and BHLYP. Use of TD-CAM-B3LYP and TD-BHLYP yields qualitatively similar results for all structures, which are also consistent with predictions of coupled cluster theory for small particles. TD-B3LYP, in contrast, is found to make rather different predictions; including apparent conical intersections for certain particles that are not observed with TD-CAM-B3LYP nor with TD-BHLYP. In line with our previous observations for vertical excitations, the issue with TD-B3LYP appears to bemore » the inherent tendency of TD-B3LYP, and other XC potentials with no or a low percentage of Hartree-Fock Like Exchange, to spuriously stabilize the energy of charge-transfer (CT) states. Even in the case of hydrated particles, for which vertical excitations are generally well described with all XC potentials, the use of TD-B3LYP appears to result in CT-problems for certain particles. We hypothesize that the spurious stabilization of CT-states by TD-B3LYP even may drive the excited state optimizations to different excited state geometries than those obtained using TD-CAM-B3LYP or TD-BHLYP. In conclusion, focusing on the TD-CAM-B3LYP and TD-BHLYP results, excited state relaxation in naked and hydrated TiO 2 nanoparticles is predicted to be associated with a large Stokes’ shift.« less

  16. Describing excited state relaxation and localization in TiO 2 nanoparticles using TD-DFT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berardo, Enrico; Hu, Han -Shi; van Dam, Hubertus J. J.

    We have investigated the description of excited state relaxation in naked and hydrated TiO 2 nanoparticles using Time-Dependent Density Functional Theory (TD-DFT) with three common hybrid exchange-correlation (XC) potentials; B3LYP, CAM-B3LYP and BHLYP. Use of TD-CAM-B3LYP and TD-BHLYP yields qualitatively similar results for all structures, which are also consistent with predictions of coupled cluster theory for small particles. TD-B3LYP, in contrast, is found to make rather different predictions; including apparent conical intersections for certain particles that are not observed with TD-CAM-B3LYP nor with TD-BHLYP. In line with our previous observations for vertical excitations, the issue with TD-B3LYP appears to bemore » the inherent tendency of TD-B3LYP, and other XC potentials with no or a low percentage of Hartree-Fock Like Exchange, to spuriously stabilize the energy of charge-transfer (CT) states. Even in the case of hydrated particles, for which vertical excitations are generally well described with all XC potentials, the use of TD-B3LYP appears to result in CT-problems for certain particles. We hypothesize that the spurious stabilization of CT-states by TD-B3LYP even may drive the excited state optimizations to different excited state geometries than those obtained using TD-CAM-B3LYP or TD-BHLYP. In conclusion, focusing on the TD-CAM-B3LYP and TD-BHLYP results, excited state relaxation in naked and hydrated TiO 2 nanoparticles is predicted to be associated with a large Stokes’ shift.« less

  17. New LMI based gain-scheduling control for recovering contact-free operation of a magnetically levitated rotor

    NASA Astrophysics Data System (ADS)

    Wang, M.; Cole, M. O. T.; Keogh, P. S.

    2017-11-01

    A new approach for the recovery of contact-free levitation of a rotor supported by active magnetic bearings (AMB) is assessed through control strategy design, system modelling and experimental verification. The rotor is considered to make contact with a touchdown bearing (TDB), which may lead to entrapment in a bi-stable nonlinear response. A linear matrix inequality (LMI) based gain-scheduling H∞ control technique is introduced to recover the rotor to a contact-free state. The controller formulation involves a time-varying effective stiffness parameter, which can be evaluated in terms of forces transmitted through the TDB. Rather than measuring these forces directly, an observer is introduced with a model of the base structure to transform base acceleration signals using polytopic coordinates for controller adjustment. Force transmission to the supporting base structure will occur either through an AMB alone without contact, or through the AMB and TDB with contact and this must be accounted for in the observer design. The controller is verified experimentally in terms of (a) non-contact robust stability and vibration suppression performance; (b) control action for contact-free recovery at typical running speeds with various unbalance and TDB misalignment conditions; and (c) coast-down experimental tests. The results demonstrate the effectiveness of the AMB control action whenever it operates within its dynamic load capacity.

  18. Real-time database drawn from an electronic health record for a thoracic surgery unit: high-quality clinical data saving time and human resources.

    PubMed

    Salati, Michele; Pompili, Cecilia; Refai, Majed; Xiumè, Francesco; Sabbatini, Armando; Brunelli, Alessandro

    2014-06-01

    The aim of the present study was to verify whether the implementation of an electronic health record (EHR) in our thoracic surgery unit allows creation of a high-quality clinical database saving time and costs. Before August 2011, multiple individuals compiled the on-paper documents/records and a single data manager inputted selected data into the database (traditional database, tDB). Since the adoption of an EHR in August 2011, multiple individuals have been responsible for compiling the EHR, which automatically generates a real-time database (EHR-based database, eDB), without the need for a data manager. During the initial period of implementation of the EHR, periodic meetings were held with all physicians involved in the use of the EHR in order to monitor and standardize the data registration process. Data quality of the first 100 anatomical lung resections recorded in the eDB was assessed by measuring the total number of missing values (MVs: existing non-reported value) and inaccurate values (wrong data) occurring in 95 core variables. The average MV of the eDB was compared with the one occurring in the same variables of the last 100 records registered in the tDB. A learning curve was constructed by plotting the number of MVs in the electronic database and tDB with the patients arranged by the date of registration. The tDB and eDB had similar MVs (0.74 vs 1, P = 0.13). The learning curve showed an initial phase including about 35 records, where MV in the eDB was higher than that in the tDB (1.9 vs 0.74, P = 0.03), and a subsequent phase, where the MV was similar in the two databases (0.7 vs 0.74, P = 0.6). The inaccuracy rate of these two phases in the eDB was stable (0.5 vs 0.3, P = 0.3). Using EHR saved an average of 9 min per patient, totalling 15 h saved for obtaining a dataset of 100 patients with respect to the tDB. The implementation of EHR allowed streamlining the process of clinical data recording. It saved time and human resource costs, without

  19. Pharmacokinetics of Sustained-Release and Transdermal Buprenorphine in Göttingen Minipigs (Sus scrofa domestica)

    PubMed Central

    Thiede, Allison J; Garcia, Kelly D; Stolarik, DeAnne F; Ma, Junli; Jenkins, Gary J; Nunamaker, Elizabeth A

    2014-01-01

    The opioid buprenorphine has been shown to provide adequate postoperative analgesia in both companion and laboratory animals. However, its use is still hindered by the need for multiple parenteral injections to achieve continuous analgesia. The purpose of the current study was to conduct a pharmacokinetic analysis of 2 new long-acting formulations of buprenorphine—an injectable sustained-release buprenorphine (SRB) and a transdermal buprenorphine (TDB) patch—in healthy Göttingen minipigs by using liquid chromatography–electrospray ionization–tandem mass spectrometry. Administration of 0.18 mg/kg SC SRB and 30 μg/h TDB achieved AUC0-Tlast of 221.6 ± 26.8 and 25.2 ± 3.9 ng × h/mL, respectively, compared with 9.7 ± 1.4 ng*h/mL for 0.02 mg/kg IV buprenorphine. By using a hypothesized therapeutic plasma buprenorphine concentration threshold of 0.1 ng/mL, therapeutic concentrations were achieved at the first study time point (5 to 30 min) and lasted an average of 8.0 ± 1.3 h for intravenous buprenorphine and 264.0 ± 32.2 h for SRB. TDB achieved therapeutic concentrations in 12 to 24 h after patch application, which lasted until the patch was removed at 72 h. The results of this study suggest that SRB and TDB are long-acting alternatives for pain management, and their use could decrease animal handling and stress, thereby simplifying pain management and improving welfare in laboratory swine. PMID:25650977

  20. An anti-CD3/anti-CLL-1 bispecific antibody for the treatment of acute myeloid leukemia.

    PubMed

    Leong, Steven R; Sukumaran, Siddharth; Hristopoulos, Maria; Totpal, Klara; Stainton, Shannon; Lu, Elizabeth; Wong, Alfred; Tam, Lucinda; Newman, Robert; Vuillemenot, Brian R; Ellerman, Diego; Gu, Chen; Mathieu, Mary; Dennis, Mark S; Nguyen, Allen; Zheng, Bing; Zhang, Crystal; Lee, Genee; Chu, Yu-Waye; Prell, Rodney A; Lin, Kedan; Laing, Steven T; Polson, Andrew G

    2017-02-02

    Acute myeloid leukemia (AML) is a major unmet medical need. Most patients have poor long-term survival, and treatment has not significantly changed in 40 years. Recently, bispecific antibodies that redirect the cytotoxic activity of effector T cells by binding to CD3, the signaling component of the T-cell receptor, and a tumor target have shown clinical activity. Notably, blinatumomab is approved to treat relapsed/refractory acute lymphoid leukemia. Here we describe the design, discovery, pharmacologic activity, pharmacokinetics, and safety of a CD3 T cell-dependent bispecific (TDB) full-length human IgG1 therapeutic antibody targeting CLL-1 that could potentially be used in humans to treat AML. CLL-1 is prevalent in AML and, unlike other targets such as CD33 and CD123, is not expressed on hematopoietic stem cells providing potential hematopoietic recovery. We selected a high-affinity monkey cross-reactive anti-CLL-1 arm and tested several anti-CD3 arms that varied in affinity, and determined that the high-affinity CD3 arms were up to 100-fold more potent in vitro. However, in mouse models, the efficacy differences were less pronounced, probably because of prolonged exposure to TDB found with lower-affinity CD3 TDBs. In monkeys, assessment of safety and target cell depletion by the high- and low-affinity TDBs revealed that only the low-affinity CD3/CLL1 TDB was well tolerated and able to deplete target cells. Our data suggest that an appropriately engineered CLL-1 TDB could be effective in the treatment of AML. © 2017 by The American Society of Hematology.

  1. Axodendritic sorting and pathological missorting of Tau are isoform-specific and determined by axon initial segment architecture.

    PubMed

    Zempel, Hans; Dennissen, Frank J A; Kumar, Yatender; Luedtke, Julia; Biernat, Jacek; Mandelkow, Eva-Maria; Mandelkow, Eckhard

    2017-07-21

    Subcellular mislocalization of the microtubule-associated protein Tau is a hallmark of Alzheimer disease (AD) and other tauopathies. Six Tau isoforms, differentiated by the presence or absence of a second repeat or of N-terminal inserts, exist in the human CNS, but their physiological and pathological differences have long remained elusive. Here, we investigated the properties and distributions of human and rodent Tau isoforms in primary forebrain rodent neurons. We found that the Tau diffusion barrier (TDB), located within the axon initial segment (AIS), controls retrograde (axon-to-soma) and anterograde (soma-to-axon) traffic of Tau. Tau isoforms without the N-terminal inserts were sorted efficiently into the axon. However, the longest isoform (2N4R-Tau) was partially retained in cell bodies and dendrites, where it accelerated spine and dendrite growth. The TDB (located within the AIS) was impaired when AIS components (ankyrin G, EB1) were knocked down or when glycogen synthase kinase-3β (GSK3β; an AD-associated kinase tethered to the AIS) was overexpressed. Using superresolution nanoscopy and live-cell imaging, we observed that microtubules within the AIS appeared highly dynamic, a feature essential for the TDB. Pathomechanistically, amyloid-β insult caused cofilin activation and F-actin remodeling and decreased microtubule dynamics in the AIS. Concomitantly with these amyloid-β-induced disruptions, the AIS/TDB sorting function failed, causing AD-like Tau missorting. In summary, we provide evidence that the human and rodent Tau isoforms differ in axodendritic sorting and amyloid-β-induced missorting and that the axodendritic distribution of Tau depends on AIS integrity. © 2017 by The American Society for Biochemistry and Molecular Biology, Inc.

  2. Mincle in the innate immune response of mice fungal keratitis.

    PubMed

    Yu, Guo-Rong; Lin, Jing; Zhang, Jie; Che, Cheng-Ye; Peng, Xu-Dong; Li, Cui; Hu, Li-Ting; Zhu, Guo-Qiang; He, Kun; Zhao, Gui-Qiu

    2018-01-01

    To investigate how macrophage inducible C-type lectin (Mincle) influences inflammation in mice fungal keratitis induced by Aspergillus fumigatus ( A. fumigatus ). C57BL/6 mice were infected with A. fumigatus after pretreated with Mincle agonist TDB or Mincle neutralizing antibody (MincleAb), taking DMSO or IgG as control group respectively. The cornea lesions were monitored with slit-lamp microscope and evaluated by clinical score. Mincle expression was assessed using reverse transcription-ploymerase chain reaction (RT-PCR) and immunostaining. The expression of cytokines (IL-1β, TNF-α and IL-6) chemokines (CXCL-1 and MIP-2) was determined by RT-PCR and ELISA. Neutrophil infiltration was observed by immunostaining. The levels of nitric oxide (NO) generated by corneas were tested by Griess reaction. Mincle mRNA and protein levels were higher in infected corneas than normal corneas of C57BL/6 mice, saving clinical scores revealed differences. When pretreated with Mincle agonist TDB, the mRNA and protein levels of IL-1β, TNF-α and IL-6 in infected corneas were significantly increased compared with the control group ( P <0.01). Results of the counterpart in corneas pretreated with Mincle neutralizing antibody was decreased consistently ( P <0.01). Expression of CXCL1 and MIP-2 mRNA levels were up-regulated in TDB group and down-regulated in MincleAb group ( P <0.01), coincide with neutrophil aggregation degree in corneas showed by immunostaining. As for the concentration of NO, it was promoted in TDB group compared with DMSO control group, and decreased in MincleAb group compared with IgG control group. Mincle plays a dual role in mice fungal keratitis. It participates in the innate immune system by enhancing inflammation. What's more, Mincle can mediate cytotoxic effects by regulating the formation of NO.

  3. Singlet-triplet splittings from the virial theorem and single-particle excitation energies

    NASA Astrophysics Data System (ADS)

    Becke, Axel D.

    2018-01-01

    The zeroth-order (uncorrelated) singlet-triplet energy difference in single-particle excited configurations is 2Kif, where Kif is the Coulomb self-energy of the product of the transition orbitals. Here we present a non-empirical, virial-theorem argument that the correlated singlet-triplet energy difference should be half of this, namely, Kif. This incredibly simple result gives vertical HOMO-LUMO excitation energies in small-molecule benchmarks as good as the popular TD-B3LYP time-dependent approach to excited states. For linear acenes and nonlinear polycyclic aromatic hydrocarbons, the performance is significantly better than TD-B3LYP. In addition to the virial theorem, the derivation borrows intuitive pair-density concepts from density-functional theory.

  4. Trajectory analysis for the nucleus and dust of comet C/2013 A1 (Siding Spring)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnocchia, Davide; Chesley, Steven R.; Chodas, Paul W.

    Comet C/2013 A1 (Siding Spring) will experience a high velocity encounter with Mars on 2014 October 19 at a distance of 135,000 km ± 5000 km from the planet center. We present a comprehensive analysis of the trajectory of both the comet nucleus and the dust tail. The nucleus of C/2013 A1 cannot impact on Mars even in the case of unexpectedly large nongravitational perturbations. Furthermore, we compute the required ejection velocities for the dust grains of the tail to reach Mars as a function of particle radius and density and heliocentric distance of the ejection. A comparison between ourmore » results and the most current modeling of the ejection velocities suggests that impacts are possible only for millimeter to centimeter size particles released more than 13 AU from the Sun. However, this level of cometary activity that far from the Sun is considered extremely unlikely. The arrival time of these particles spans a 20-minute time interval centered at 2014 October 19 at 20:09 TDB, i.e., around the time that Mars crosses the orbital plane of C/2013 A1. Ejection velocities larger than currently estimated by a factor >2 would allow impacts for smaller particles ejected as close as 3 AU from the Sun. These particles would reach Mars from 19:13 TDB to 20:40 TDB.« less

  5. [Problems of epidemic safety of drinking water use by the population of Russia].

    PubMed

    Nedachin, A E; Artemova, T Z; Dmitrieva, R A; Doskina, T V; Talaeva, Iu G; Ivanova, L V; Butorina, N N; Lavrova, D V; Sanamian, A G; Zagaĭnova, A V; Aleshnia, V V; Zhuravlev, P V; Golovina, S V; Panasovets, O P; Savilov, E D; Mamontova, L M; Anganova, E V

    2005-01-01

    Quantitative relationships were studied between the indicators (common coliform bacteria (CCP), glucose-positive bacteria (GPB), thermoduric bacteria (TDB), coliform bacteria, enterococci, clostridia, coliphages) and the opportunistic (Pseudomonas aeruginosa, Proteus, Klebsiella) and pathogenetic (Salmonella and intestinal viruses) microorganisms at the stages of effluent purification and decontamination, in processes of self-purification in the water reservoirs and of water preparation at water-supplying stations, as well as in the association with the incidence of acute intestinal infections of bacterial and viral genesis in different climatic zones of the country. Salmonella and the opportunistic bacteria of the Enterobacteriaceae family and Pseudomonas aeruginosa were found to be highly resistant to detoxifying agents and environmental factors, adaptable, able to reproduce in pure water, to long survive in underground waters, and to accumulate when water is desalinated at the erections. The cases of intestinal infections were found in the population using the portable water of the standard quality in terms of E. coli, TDB, CCB, and enterococci. In this case only the wider integral index of GPB, which includes the indices of E. coli, TDB, CCB, as well as lactose-negative pathogenic and opportunistic species retains its sanitary significance in terms of all signs and is a reliable indicator of the potential epidemic hazard of drinking water use. Long-term studies have provided evidence for the sanitary value of coliphages as indicators of viral drinking water contamination.

  6. Formulation of a mmaA4 Gene Deletion Mutant of Mycobacterium bovis BCG in Cationic Liposomes Significantly Enhances Protection against Tuberculosis

    PubMed Central

    Derrick, Steven C.; Dao, Dee; Yang, Amy; Kolibab, Kris; Jacobs, William R.; Morris, Sheldon L.

    2012-01-01

    A new vaccination strategy is urgently needed for improved control of the global tuberculosis (TB) epidemic. Using a mouse aerosol Mycobacterium tuberculosis challenge model, we investigated the protective efficacy of a mmaA4 gene deletion mutant of Mycobacterium bovis BCG (ΔmmaA4BCG) formulated in dimethyl dioctadecyl ammonium bromide (DDA) – D(+) trehalose 6,6 dibenenate (TDB) (DDA/TDB) adjuvant. In previous studies, deletion of the mmaA4 gene was shown to reduce the suppression of IL-12 production often seen after mycobacterial infections. While the non-adjuvanted ΔmmaA4BCG strain did not protect mice substantially better than conventional BCG against a tuberculous challenge in four protection experiments, the protective responses induced by the ΔmmaA4BCG vaccine formulated in DDA/TDB adjuvant was consistently increased relative to nonadjuvanted BCG controls. Furthermore, the ΔmmaA4BCG-DDA/TDB vaccine induced significantly higher frequencies of multifunctional (MFT) CD4 T cells expressing both IFNγ and TNFα (double positive) or IFNγ, TNFα and IL-2 (triple positive) than CD4 T cells derived from mice vaccinated with BCG. These MFT cells were characterized by having higher IFNγ and TNFα median fluorescence intensity (MFI) values than monofunctional CD4 T cells. Interestingly, both BCG/adjuvant and ΔmmaA4BCG/adjuvant formulations induced significantly higher frequencies of CD4 T cells expressing TNFα and IL-2 than nonadjuvanted BCG or ΔmmaA4BCG vaccines indicating that BCG/adjuvant mixtures may be more effective at inducing central memory T cells. Importantly, when either conventional BCG or the mutant were formulated in adjuvant and administered to SCID mice or immunocompromised mice depleted of IFNγ, significantly lower vaccine-derived mycobacterial CFU were detected relative to immunodeficient mice injected with non-adjuvanted BCG. Overall, these data suggest that immunization with the ΔmmaA4BCG/adjuvant formulation may be an effective, safe

  7. TREATABILITY DATABASE DESCRIPTION

    EPA Science Inventory

    The Drinking Water Treatability Database (TDB) presents referenced information on the control of contaminants in drinking water. It allows drinking water utilities, first responders to spills or emergencies, treatment process designers, research organizations, academics, regulato...

  8. EPA’s Drinking Water Treatability Database: A Tool for All Drinking Water Professionals

    EPA Science Inventory

    The Drinking Water Treatability Database (TDB) is being developed by the USEPA Office of Research and Development to allow drinking water professionals and others to access referenced information gathered from thousands of literature sources and assembled on one site. Currently, ...

  9. Reflex peripheral vasoconstriction is diminished in older men.

    PubMed

    Kenney, W L; Armstrong, C G

    1996-02-01

    The purpose of this study was to compare reflex control of limb blood flow in healthy young (Y; 26 +/- 2 yr) and older (O;61 +/- 2 yr) men during whole body cooling under resting conditions. To better isolate the effect of chronological age, the two age groups (n = 6 per group) were closely matched for maximal oxygen uptake, body surface area, skinfold thickness, and fat-free weight. Subjects sat in an environmentally controlled chamber clad in standardized (0.6-clo) light cotton clothing at a dry-bulb temperature (Tdb) of 28 degrees C. After 30 min, Tdb was decreased by 2 degrees C every 5 min until Tdb = 10 degrees C, where it was held constant for the remainder of the 120-min session. Esophageal and mean skin temperatures were monitored continuously. Forearm blood flow (FBF) was measured every 5 min by venous occlusion plethysmography by using a mercury-in-Silastic strain gauge while arm temperature between the wrist and elbow was clamped at 37.2 +/- 0.1 degrees C by localized warm air heating. In this way, limb vasoconstriction was driven solely by thermoregulatory reflexes and not by direct effects of localized cooling. Mean skin temperature decreased at a similar rate and to a similar extent (by approximately 6 degrees C over a 2-h period) in both age groups, whereas esophageal temperature was relatively unaffected. In response to the local heating, the Y group maintained a significantly higher FBF than did the O group during the initial 30 min but decreased FBF during the cooling phase at a greater rate and to a greater extent than did the O group, leading to a significantly lower FBF during the final 30 min (at Tdb = 10 degrees C). Because there was no age difference in the mean arterial pressure response, similar effects of age were seen on forearm vascular conductance (FBF/mean arterial pressure). It was concluded that older men have a diminished reflex limb vasoconstrictor response to skin cooling. Furthermore, this difference in control of peripheral

  10. Drinking Water Treatability Database (Database)

    EPA Science Inventory

    The drinking Water Treatability Database (TDB) will provide data taken from the literature on the control of contaminants in drinking water, and will be housed on an interactive, publicly-available USEPA web site. It can be used for identifying effective treatment processes, rec...

  11. Innovative Approach for Development of Drinking Water Research Data in the EPA Treatability Database

    EPA Science Inventory

    In recent years, funding for development of the TDB has been limited due to Federal budget constraints. As a result, EPA adopted an innovative approach to continue the development of new contaminants and maintenance of treatability information on over 60 existing drinking water ...

  12. Loran-C flight data base

    NASA Technical Reports Server (NTRS)

    Lilley, R. W.

    1979-01-01

    Loran-C time-difference data were collected on January 9, 1979 during a flight from Athens, Ohio to Madison VOR in Connecticut, thence to Millville VOR in New Jersey, and a landing at Atlantic City NAFEC. Portions of the return trip to Athens, Ohio were also recorded. Loran-C GRI data frames were recorded using the 99600 U. S. Northeast Loran chain stations Seneca/Nantucket (TDA) and Seneca/Carolina Beach (TDB). The GRI sequence number TDA and TDB were recorded as integer numbers, with the TD's in integer microseconds. Actual time-of-day can be determined from the data start time, plus the time per GRI and the sequence number. The low cost Loran-C receiver was used to obtain the time-difference data for each GRI. Data was recorded on digital magnetic tape and post-processed into latitude and longitude using an IBM system/370 computer.

  13. Optical properties of alkali halide crystals from all-electron hybrid TD-DFT calculations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Webster, R., E-mail: ross.webster07@imperial.ac.uk; Harrison, N. M.; Bernasconi, L.

    2015-06-07

    We present a study of the electronic and optical properties of a series of alkali halide crystals AX, with A = Li, Na, K, Rb and X = F, Cl, Br based on a recent implementation of hybrid-exchange time-dependent density functional theory (TD-DFT) (TD-B3LYP) in the all-electron Gaussian basis set code CRYSTAL. We examine, in particular, the impact of basis set size and quality on the prediction of the optical gap and exciton binding energy. The formation of bound excitons by photoexcitation is observed in all the studied systems and this is shown to be correlated to specific features ofmore » the Hartree-Fock exchange component of the TD-DFT response kernel. All computed optical gaps and exciton binding energies are however markedly below estimated experimental and, where available, 2-particle Green’s function (GW-Bethe-Salpeter equation, GW-BSE) values. We attribute this reduced exciton binding to the incorrect asymptotics of the B3LYP exchange correlation ground state functional and of the TD-B3LYP response kernel, which lead to a large underestimation of the Coulomb interaction between the excited electron and hole wavefunctions. Considering LiF as an example, we correlate the asymptotic behaviour of the TD-B3LYP kernel to the fraction of Fock exchange admixed in the ground state functional c{sub HF} and show that there exists one value of c{sub HF} (∼0.32) that reproduces at least semi-quantitatively the optical gap of this material.« less

  14. 32 CFR Appendix A to Part 989 - Glossary of References, Abbreviations, Acronyms, and Terms

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Engineering and the Environment AFCEE/TDB AFCEE Technical Directorate, Built Infrastructure Division (AFCEE... Materiel Command HQ USAF Headquarters, United States Air Force HQ USAF/A7C The Air Force Civil Engineer.../AQR Deputy Assistant Secretary of the Air Force (Science, Technology, and Engineering) SAF/GC Air...

  15. A Practical Introduction to Non-Bibliographic Database Searching.

    ERIC Educational Resources Information Center

    Rocke, Hans J.; And Others

    This guide comprises four reports on the Laboratory Animal Data Bank (LADB), the National Institute of Health Environmental Protection Agency (NIH/EPA) Chemical Information System (CIS), nonbibliographic databases for the social sciences, and the Toxicology Data Bank (TDB) and Registry of Toxic Effects of Chemical Substances (RTECS). The first…

  16. PLGA particulate subunit tuberculosis vaccines promote humoral and Th17 responses but do not enhance control of Mycobacterium tuberculosis infection

    PubMed Central

    Parumasivam, Thaigarajan; Chan, John Gar Yan; Lin, Leon C. W.; Flórido, Manuela; West, Nicholas P.; Chan, Hak-Kim; Britton, Warwick J.

    2018-01-01

    Tuberculosis places a staggering burden on human health globally. The new World Health Organisation End-TB Strategy has highlighted the urgent need for more effective TB vaccines to improve control of the disease. Protein-based subunit vaccines offer potential as safe and effective generators of protective immunity, and the use of particulate vaccine formulation and delivery by the pulmonary route may enhance local immunogenicity. In this study, novel particulate subunit vaccines were developed utilising biodegradable poly(lactic-co-glycolic acid) (PLGA) slow-release particles as carriers for the Mycobacterium tuberculosis lipoprotein MPT83, together with the adjuvants trehalose-dibehenate (TDB) or Monophosphoryl lipid A (MPL). Following delivery by the pulmonary or subcutaneous routes, the immunogenicity and protective efficacy of these vaccines were assessed in a murine model of M. tuberculosis infection. When delivered peripherally, these vaccines induced modest, antigen-specific Th1 and Th17 responses, but strong anti-MPT83 antibody responses. Mucosal delivery of the PLGA(MPT83) vaccine, with or without TDB, increased antigen-specific Th17 responses in the lungs, however, PLGA-encapsulated vaccines did not provide protection against M. tuberculosis challenge. By contrast, peripheral delivery of DDA liposomes containing MPT83 and TDB or MPL, stimulated both Th1 and Th17 responses and generated protection against M. tuberculosis challenge. Therefore, PLGA-formulated vaccines primarily stimulate strong humoral immunity, or Th17 responses if used mucosally, and may be a suitable carrier for vaccines against extracellular pathogens. This study emphasises the critical nature of the vaccine carrier, adjuvant and route of delivery for optimising vaccine efficacy against TB. PMID:29554138

  17. User's Manual for the National Water-Quality Assessment Program Invertebrate Data Analysis System (IDAS) Software: Version 3

    USGS Publications Warehouse

    Cuffney, Thomas F.

    2003-01-01

    The Invertebrate Data Analysis System (IDAS) software provides an accurate, consistent, and efficient mechanism for analyzing invertebrate data collected as part of the National Water-Quality Assessment Program and stored in the Biological Transactional Database (Bio-TDB). The IDAS software is a stand-alone program for personal computers that run Microsoft (MS) Windows?. It allows users to read data downloaded from Bio-TDB and stored either as MS Excel? or MS Access? files. The program consists of five modules. The Edit Data module allows the user to subset, combine, delete, and summarize community data. The Data Preparation module allows the user to select the type(s) of sample(s) to process, calculate densities, delete taxa based on laboratory processing notes, combine lifestages or keep them separate, select a lowest taxonomic level for analysis, delete rare taxa, and resolve taxonomic ambiguities. The Calculate Community Metrics module allows the user to calculate over 130 community metrics, including metrics based on organism tolerances and functional feeding groups. The Calculate Diversities and Similarities module allows the user to calculate nine diversity and eight similarity indices. The Data export module allows the user to export data to other software packages and produce tables of community data that can be imported into spreadsheet and word-processing programs. Though the IDAS program was developed to process invertebrate data downloaded from USGS databases, it will work with other data sets that are converted to the USGS (Bio-TDB) format. Consequently, the data manipulation, analysis, and export procedures provided by the IDAS program can be used by anyone involved in using benthic macroinvertebrates in applied or basic research.

  18. 10 CFR Appendix A to Subpart R of... - Uniform Test Method for the Measurement of Energy Consumption of the Components of Envelopes of...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... Table A.1—Temperature Conditions Internal Temperatures (cooled space within the envelope) Cooler Dry... the envelope) Freezer and Cooler Dry Bulb Temperatures 75 °F. Subfloor Temperatures Freezer and Cooler... prescribed in Table A.1; and TDB,int,dp = dry-bulb air temperature internal to the cooler or freezer, °F, as...

  19. Direct determination of platinum group elements and their distributions in geological and environmental samples at the ng g(-1) level using LA-ICP-IDMS.

    PubMed

    Boulyga, Sergei F; Heumann, Klaus G

    2005-10-01

    Laser ablation inductively coupled plasma isotope dilution mass spectrometry (LA-ICP-IDMS) was applied to the direct and simultaneous determination of the platinum group elements (PGEs) Pt, Pd, Ru, and Ir in geological and environmental samples. A special laser ablation system with high ablation rates was used, along with sector field ICP-MS. Special attention was paid to deriving the distributions of PGEs in the pulverized samples. IDMS could not be applied to the (mono-isotopic) Rh, but the similar ablation behavior of Ru and Rh allowed Rh to be simultaneously determined via relative sensitivity coefficients. The laser ablation process produces hardly any oxide ions (which usually cause interference in PGE analysis with liquid sample injection), so the ICP-MS can be run in its low mass resolution but high-sensitivity mode. The detection limits obtained for the geological samples were 0.16 ng g(-1), 0.14 ng g(-1), 0.08 ng g(-1), 0.01 ng g(-1) and 0.06 ng g(-1) for Ru, Rh, Pd, Ir and Pt, respectively. LA-ICP-IDMS was applied to different geological reference materials (TDB-1, WGB-1, UMT-1, WMG-1, SARM-7) and the road dust reference material BCR-723, which are only certified for some of the PGEs. Comparisons with certified values as well as with indicative values from the literature demonstrated the validity of the LA-ICP-IDMS method. The PGE concentrations in subsamples of the road dust reference material correspond to a normal distribution, whereas the distributions in the geological reference materials TDB-1, WGB-1, UMT-1, WMG-1, and SARM-7 are more complex. For example, in the case of Ru, a logarithmic normal distribution best fits the analyzed concentrations in TDB-1 subsamples, whereas a pronounced nugget effect was found for Pt in most geological samples.

  20. Al-Li Alloy 1441 for Fuselage Applications

    NASA Technical Reports Server (NTRS)

    Bird, R. K.; Dicus, D. L.; Fridlyander, J. N.; Sandler, V. S.

    2000-01-01

    A cooperative investigation was conducted to evaluate Al-Cu-Mg-Li alloy 1441 for long service life fuselage applications. Alloy 1441 is currently being used for fuselage applications on the Russian Be-103 amphibious aircraft, and is expected to be used for fuselage skin on a new Tupolev business class aircraft. Alloy 1441 is cold-rollable and has several attributes that make it attractive for fuselage skin applications. These attributes include lower density and higher specific modulus with similar strength as compared to conventional Al-Cu-Mg alloys. Cold-rolled 1441 Al-Li sheet specimens were tested at NASA Langley Research Center (LaRC) and at the All-Russia Institute of Aviation Materials (VIAM) in Russia to evaluate tensile properties, fracture toughness, impact resistance, fatigue life and fatigue crack growth rate. In addition, fuselage panels were fabricated by Tupolev Design Bureau (TDB) using 1441 skins and Al-Zn-Mg-Cu alloy stiffeners. The panels were subjected to cyclic pressurization fatigue tests at TDB and at LaRC to simulate fuselage pressurization/depressurization during aircraft service. This paper discusses the results from this investigation.

  1. Fermented Apulian table olives: Effect of selected microbial starters on polyphenols composition, antioxidant activities and bioaccessibility.

    PubMed

    D'Antuono, Isabella; Bruno, Angelica; Linsalata, Vito; Minervini, Fiorenza; Garbetta, Antonella; Tufariello, Maria; Mita, Giovanni; Logrieco, Antonio F; Bleve, Gianluca; Cardinali, Angela

    2018-05-15

    The effects of fermentation by autochthonous microbial starters on phenolics composition of Apulian table olives, Bella di Cerignola (BDC), Termite di Bitetto (TDB) and Cellina di Nardò (CEL) were studied, highlighting also the cultivars influence. In BDC with starter, polyphenols amount doubled compared with commercial sample, while in TDB and CEL, phenolics remain almost unchanged. The main phenolics were hydroxytyrosol, tyrosol, verbascoside and luteolin, followed by hydroxytyrosol-acetate detected in BDC and cyanidine-3-glucoside and quercetin in CEL. Scavenger capacity in both DPPH and CAA assays, assessed the highest antioxidant effect for CEL with starters (21.7 mg Trolox eq/g FW; 8.5 μmol hydroxytyrosol eq/100 g FW). The polyphenols were highly in vitro bioaccessible (>60%), although modifications in their profile, probably for combined effect of environment and microorganisms, were noted. Finally, fermented table olives are excellent source of health promoting compounds, since hydroxytyrosol and tyrosol are almost 8 times more than in olive oil. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Absorption of arsenic from soil and water by two chard (Beta vulgaris L.) varieties: A potential risk to human health.

    PubMed

    Yañez, L M; Alfaro, J A; Bovi Mitre, G

    2018-07-15

    The accumulation of arsenic (As) in vegetables poses a risk of contamination to humans via the food chain. Two chard (var. cicla and var. d'ampuis) crops were grown for 60 days in greenhouses on Aridisol soil, and irrigated with water from Pastos Chicos, Jujuy (Argentina). The soil and water used in the trial presented 49 and 1.44 mg/L As concentration levels, respectively. Total dry biomass (TDB) and total As were determined in soils, roots and leaves. The latter was quantified by atomic absorption spectrometry with hydride generation, and bioconcentration and translocation factors were determined. TDB in var. cicla showed statistically significant differences when the plant was cultivated in control soil and watered with the toxicant (2.04 g), as compared with the treatment without exposure (2.8 g). TDB in var. d'ampuis presented statistically significant differences with respect to that of the control when the plants were grown in soils with As and watered with the toxicant (3.3 g). This variety increased its biomass in the presence of As. In the two Swiss chard varieties evaluated, the largest As accumulation in root and leaves was found when they were cultivated in contaminated soil and watered with distilled water. The presence of the toxicant in the leaves exceeded the limits established by Código Alimentario Argentino, i.e. 0.30 mg/kg. Total target hazard quotient (THQ) values for As were higher than 1, suggesting that consumers would run significant risks when consuming these chard varieties. Furthermore, it was determined that the carcinogenic risk (CR) posed by this type of exposure to As exceeded the acceptable risk level of 1 × 10 -6 . Based on this evidence, we may conclude that consuming chard cultivated on the evaluated site brings about considerable risks to local residents' health. Copyright © 2018 Elsevier Ltd. All rights reserved.

  3. Induction of Unconventional T Cells by a Mutant Mycobacterium bovis BCG Strain Formulated in Cationic Liposomes Correlates with Protection against Mycobacterium tuberculosis Infections of Immunocompromised Mice

    PubMed Central

    Yabe, Idalia; Morris, Sheldon; Cowley, Siobhan

    2016-01-01

    Earlier studies aimed at defining protective immunity induced by Mycobacterium bovis BCG immunization have largely focused on the induction of antituberculosis CD4+ and CD8+ T cell responses. Here we describe a vaccine consisting of a BCGΔmmaA4 deletion mutant formulated in dimethyl dioctadecyl-ammonium bromide (DDA) with d-(+)-trehalose 6,6′-dibehenate (TDB) (DDA/TDB) adjuvant (A4/Adj) that protected TCRδ−/− mice depleted of CD4+, CD8+, and NK1.1+ T cells against an aerosol challenge with M. tuberculosis. These mice were significantly protected relative to mice immunized with a nonadjuvanted BCGΔmmaA4 (BCG-A4) mutant and nonvaccinated controls at 2 months and 9 months postvaccination. In the absence of all T cells following treatment with anti-Thy1.2 antibody, the immunized mice lost the ability to control the infection. These results indicate that an unconventional T cell population was mediating protection in the absence of CD4+, CD8+, NK1.1+, and TCRγδ T cells and could exhibit memory. Focusing on CD4− CD8− double-negative (DN) T cells, we found that these cells accumulated in the lungs postchallenge significantly more in A4/Adj-immunized mice and induced significantly greater frequencies of pulmonary gamma interferon (IFN-γ)-producing cells than were seen in the nonvaccinated or nonadjuvanted BCG control groups. Moreover, pulmonary DN T cells from the A4/Adj group exhibited significantly higher IFN-γ integrated median fluorescence intensity (iMFI) values than were seen in the control groups. We also showed that enriched DN T cells from mice immunized with A4/Adj could control mycobacterial growth in vitro significantly better than naive whole-spleen cells. These results suggest that formulating BCG in DDA/TDB adjuvant confers superior protection in immunocompromised mice and likely involves the induction of long-lived memory DN T cells. PMID:27226281

  4. Engineering of a novel adjuvant based on lipid-polymer hybrid nanoparticles: A quality-by-design approach.

    PubMed

    Rose, Fabrice; Wern, Jeanette Erbo; Ingvarsson, Pall Thor; van de Weert, Marco; Andersen, Peter; Follmann, Frank; Foged, Camilla

    2015-07-28

    The purpose of this study was to design a novel and versatile adjuvant intended for mucosal vaccination based on biodegradable poly(DL-lactic-co-glycolic acid) (PLGA) nanoparticles (NPs) modified with the cationic surfactant dimethyldioctadecylammonium (DDA) bromide and the immunopotentiator trehalose-6,6'-dibehenate (TDB) (CAF01) to tailor humoral and cellular immunity characterized by antibodies and Th1/Th17 responses. Such responses are important for the protection against diseases caused by intracellular bacteria such as Chlamydia trachomatis and Mycobacterium tuberculosis. The hybrid NPs were engineered using an oil-in-water single emulsion method and a quality-by-design approach was adopted to define the optimal operating space (OOS). Four critical process parameters (CPPs) were identified, including the acetone concentration in the water phase, the stabilizer [polyvinylalcohol (PVA)] concentration, the lipid-to-total solid ratio, and the total concentration. The CPPs were linked to critical quality attributes consisting of the particle size, polydispersity index (PDI), zeta-potential, thermotropic phase behavior, yield and stability. A central composite face-centered design was performed followed by multiple linear regression analysis. The size, PDI, enthalpy of the phase transition and yield were successfully modeled, whereas the models for the zeta-potential and the stability were poor. Cryo-transmission electron microscopy revealed that the main structural effect on the nanoparticle architecture is caused by the use of PVA, and two different morphologies were identified: i) A PLGA core coated with one or several concentric lipid bilayers, and ii) a PLGA nanoshell encapsulating lipid membrane structures. The optimal formulation, identified from the OOS, was evaluated in vivo. The hybrid NPs induced antibody and Th1/Th17 immune responses that were similar in quality and magnitude to the response induced by DDA/TDB liposomes, showing that the adjuvant

  5. Time References in US and UK Astronomical and Navigational Almanacs

    DTIC Science & Technology

    2011-01-01

    are also compatible with Teph and TDB. 2.4. Terrestrial and Barycentric Dynamic Times An apparent place, or equivalently the geocentric intermediate...right ascension and declination with respect to the CIO and equator of date, is defined in the Geocentric Celestial Reference System where the... Geocentric Coordinate Time (TCG) nor Barycentric Coordinate Time (TCB) is used in the US and UK almanacs for different reasons. TCG is a coordinate time

  6. Real-time terrain storage generation from multiple sensors towards mobile robot operation interface.

    PubMed

    Song, Wei; Cho, Seoungjae; Xi, Yulong; Cho, Kyungeun; Um, Kyhyun

    2014-01-01

    A mobile robot mounted with multiple sensors is used to rapidly collect 3D point clouds and video images so as to allow accurate terrain modeling. In this study, we develop a real-time terrain storage generation and representation system including a nonground point database (PDB), ground mesh database (MDB), and texture database (TDB). A voxel-based flag map is proposed for incrementally registering large-scale point clouds in a terrain model in real time. We quantize the 3D point clouds into 3D grids of the flag map as a comparative table in order to remove the redundant points. We integrate the large-scale 3D point clouds into a nonground PDB and a node-based terrain mesh using the CPU. Subsequently, we program a graphics processing unit (GPU) to generate the TDB by mapping the triangles in the terrain mesh onto the captured video images. Finally, we produce a nonground voxel map and a ground textured mesh as a terrain reconstruction result. Our proposed methods were tested in an outdoor environment. Our results show that the proposed system was able to rapidly generate terrain storage and provide high resolution terrain representation for mobile mapping services and a graphical user interface between remote operators and mobile robots.

  7. Pervious concrete reactive barrier for removal of heavy metals from acid mine drainage - column study.

    PubMed

    Shabalala, Ayanda N; Ekolu, Stephen O; Diop, Souleymane; Solomon, Fitsum

    2017-02-05

    This paper presents a column study conducted to investigate the potential use of pervious concrete as a reactive barrier for treatment of water impacted by mine waste. The study was done using acid mine drainage (AMD) collected from a gold mine (WZ) and a coalfield (TDB). Pervious concrete mixtures consisting of Portland cement CEM I 52.5R with or without 30% fly ash (FA) were prepared at a water-cementitious ratio of 0.27 then used to make cubes which were employed in the reactor columns. It was found that the removal efficiency levels of Al, Fe, Mn, Co and Ni were 75%, 98%, 99%, 94% and 95% for WZ; 87%, 96%, 99%, 98% and 90% for TDB, respectively. The high rate of acid reduction and metal removal by pervious concrete is attributed to dissolution of portlandite which is a typical constituent of concrete. The dominant reaction product in all four columns was gypsum, which also contributed to some removal of sulphate from AMD. Formation of gypsum, goethite, and Glauber's salt were identified. Precipitation of metal hydroxides seems to be the dominant metal removal mechanism. Use of pervious concrete offers a promising alternative treatment method for polluted or acidic mine water. Copyright © 2016 Elsevier B.V. All rights reserved.

  8. Real-Time Terrain Storage Generation from Multiple Sensors towards Mobile Robot Operation Interface

    PubMed Central

    Cho, Seoungjae; Xi, Yulong; Cho, Kyungeun

    2014-01-01

    A mobile robot mounted with multiple sensors is used to rapidly collect 3D point clouds and video images so as to allow accurate terrain modeling. In this study, we develop a real-time terrain storage generation and representation system including a nonground point database (PDB), ground mesh database (MDB), and texture database (TDB). A voxel-based flag map is proposed for incrementally registering large-scale point clouds in a terrain model in real time. We quantize the 3D point clouds into 3D grids of the flag map as a comparative table in order to remove the redundant points. We integrate the large-scale 3D point clouds into a nonground PDB and a node-based terrain mesh using the CPU. Subsequently, we program a graphics processing unit (GPU) to generate the TDB by mapping the triangles in the terrain mesh onto the captured video images. Finally, we produce a nonground voxel map and a ground textured mesh as a terrain reconstruction result. Our proposed methods were tested in an outdoor environment. Our results show that the proposed system was able to rapidly generate terrain storage and provide high resolution terrain representation for mobile mapping services and a graphical user interface between remote operators and mobile robots. PMID:25101321

  9. The Eimeria Transcript DB: an integrated resource for annotated transcripts of protozoan parasites of the genus Eimeria

    PubMed Central

    Rangel, Luiz Thibério; Novaes, Jeniffer; Durham, Alan M.; Madeira, Alda Maria B. N.; Gruber, Arthur

    2013-01-01

    Parasites of the genus Eimeria infect a wide range of vertebrate hosts, including chickens. We have recently reported a comparative analysis of the transcriptomes of Eimeria acervulina, Eimeria maxima and Eimeria tenella, integrating ORESTES data produced by our group and publicly available Expressed Sequence Tags (ESTs). All cDNA reads have been assembled, and the reconstructed transcripts have been submitted to a comprehensive functional annotation pipeline. Additional studies included orthology assignment across apicomplexan parasites and clustering analyses of gene expression profiles among different developmental stages of the parasites. To make all this body of information publicly available, we constructed the Eimeria Transcript Database (EimeriaTDB), a web repository that provides access to sequence data, annotation and comparative analyses. Here, we describe the web interface, available sequence data sets and query tools implemented on the site. The main goal of this work is to offer a public repository of sequence and functional annotation data of reconstructed transcripts of parasites of the genus Eimeria. We believe that EimeriaTDB will represent a valuable and complementary resource for the Eimeria scientific community and for those researchers interested in comparative genomics of apicomplexan parasites. Database URL: http://www.coccidia.icb.usp.br/eimeriatdb/ PMID:23411718

  10. Effects of exercise and heat stress on regional blood flow in pregnant sheep.

    PubMed

    Bell, A W; Hales, J R; Fawcett, A A; King, R B

    1986-05-01

    Radioactive microspheres were used to measure cardiac output and blood flow to most major tissues, including those in the pregnant uterus, in late-pregnant ewes at rest and during treadmill exercise (approximately 3-fold increase in metabolic rate for 30 min) in thermoneutral (TN) (dry bulb temperature (Tdb) = 13 degrees C, wet bulb temperature (Twb) = 10 degrees C) and mildly hot (MH) (Tdb = 40 degrees C, Twb = 27 degrees C) environments. Exercise caused major increases in blood flow to respiratory muscles, nonrespiratory limb muscles, and adipose tissue, and flow was decreased to some gastrointestinal tissues, spleen, pancreas, and to placental and nonplacental tissues in the pregnant uterus. Heat exposure had relatively little effect on these exercise-induced changes, except that flow was further increased in the respiratory muscles. Results are compared with those of a similar study on nonpregnant sheep in which changes in muscle, skin, and visceral flows during exercise were attenuated by heat exposure. It is suggested that redistribution of blood flow from the pregnant uterus, which in resting ewes took 22% of cardiac output, is a significant buffer against the potentially deleterious effects of combined exercise and heat stress on blood flow to exercising muscles and thermoregulatory tissues.

  11. Compression for an effective management of telemetry data

    NASA Technical Reports Server (NTRS)

    Arcangeli, J.-P.; Crochemore, M.; Hourcastagnou, J.-N.; Pin, J.-E.

    1993-01-01

    A Technological DataBase (T.D.B.) records all the values taken by the physical on-board parameters of a satellite since launch time. The amount of temporal data is very large (about 15 Gbytes for the satellite TDF1) and an efficient system must allow users to have a fast access to any value. This paper presents a new solution for T.D.B. management. The main feature of our new approach is the use of lossless data compression methods. Several parametrizable data compression algorithms based on substitution, relative difference and run-length encoding are available. Each of them is dedicated to a specific type of variation of the parameters' values. For each parameter, an analysis of stability is performed at decommutation time, and then the best method is chosen and run. A prototype intended to process different sorts of satellites has been developed. Its performances are well beyond the requirements and prove that data compression is both time and space efficient. For instance, the amount of data for TDF1 has been reduced to 1.05 Gbytes (compression ratio is 1/13) and access time for a typical query has been reduced from 975 seconds to 14 seconds.

  12. Thermodynamic database for the Co-Pr system.

    PubMed

    Zhou, S H; Kramer, M J; Meng, F Q; McCallum, R W; Ott, R T

    2016-03-01

    In this article, we describe data on (1) compositions for both as-cast and heat treated specimens were summarized in Table 1; (2) the determined enthalpy of mixing of liquid phase is listed in Table 2; (3) thermodynamic database of the Co-Pr system in TDB format for the research articled entitle Chemical partitioning for the Co-Pr system: First-principles, experiments and energetic calculations to investigate the hard magnetic phase W.

  13. Electronic states of Myricetin. UV-Vis polarization spectroscopy and quantum chemical calculations

    NASA Astrophysics Data System (ADS)

    Vojta, Danijela; Karlsen, Eva Marie; Spanget-Larsen, Jens

    2017-02-01

    Myricetin (3,3‧,4‧,5,5‧,7‧-hexahydroxyflavone) was investigated by linear dichroism spectroscopy on molecular samples partially aligned in stretched poly(vinyl alcohol) (PVA). At least five electronic transitions in the range 40,000-20,000 cm- 1 were characterized with respect to their wavenumbers, relative intensities, and transition moment directions. The observed bands were assigned to electronic transitions predicted with TD-B3LYP/6-31 + G(d,p).

  14. Thermodynamic database for the Co-Pr system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, S. H.; Kramer, M. J.; Meng, F. Q.

    2016-01-21

    In this article, we describe data on (1) compositions for both as-cast and heat treated specimens were summarized in Table 1; (2) the determined enthalpy of mixing of liquid phase is listed in Table 2; (3) thermodynamic database of the Co-Pr system in TDB format for the research articled entitle Chemical partitioning for the Co-Pr system: First-principles, experiments and energetic calculations to investigate the hard magnetic phase W.

  15. Thermodynamic database for the Co-Pr system

    DOE PAGES

    Zhou, S. H.; Kramer, M. J.; Meng, F. Q.; ...

    2016-03-01

    In this article, we describe data on (1) compositions for both as-cast and heat treated specimens were summarized in Table 1; (2) the determined enthalpy of mixing of liquid phase is listed in Table 2; (3) thermodynamic database of the Co-Pr system in TDB format for the research articled entitled ''Chemical partitioning for the Co-Pr system: First-principles, experiments and energetic calculations to investigate the hard magnetic phase W.''

  16. An identification method of orbit responses rooting in vibration analysis of rotor during touchdowns of active magnetic bearings

    NASA Astrophysics Data System (ADS)

    Liu, Tao; Lyu, Mindong; Wang, Zixi; Yan, Shaoze

    2018-02-01

    Identification of orbit responses can make the active protection operation more easily realize for active magnetic bearings (AMB) in case of touchdowns. This paper presents an identification method of the orbit responses rooting on signal processing of rotor displacements during touchdowns. The recognition method consists of two major steps. Firstly, the combined rub and bouncing is distinguished from the other orbit responses by the mathematical expectation of axis displacements of the rotor. Because when the combined rub and bouncing occurs, the rotor of AMB will not be always close to the touchdown bearings (TDB). Secondly, we recognize the pendulum vibration and the full rub by the Fourier spectrum of displacement in horizontal direction, as the frequency characteristics of the two responses are different. The principle of the whole identification algorithm is illustrated by two sets of signal generated by a dynamic model of the specific rotor-TDB system. The universality of the method is validated by other four sets of signal. Besides, the adaptability of noise is also tested by adding white noises with different strengths, and the result is promising. As the mathematical expectation and Discrete Fourier transform are major calculations of the algorithm, the calculation quantity of the algorithm is low, so it is fast, easily realized and embedded in the AMB controller, which has an important engineering value for the protection of AMBs during touchdowns.

  17. oriTfinder: a web-based tool for the identification of origin of transfers in DNA sequences of bacterial mobile genetic elements.

    PubMed

    Li, Xiaobin; Xie, Yingzhou; Liu, Meng; Tai, Cui; Sun, Jingyong; Deng, Zixin; Ou, Hong-Yu

    2018-05-04

    oriTfinder is a web server that facilitates the rapid identification of the origin of transfer site (oriT) of a conjugative plasmid or chromosome-borne integrative and conjugative element. The utilized back-end database oriTDB was built upon more than one thousand known oriT regions of bacterial mobile genetic elements (MGEs) as well as the known MGE-encoding relaxases and type IV coupling proteins (T4CP). With a combination of similarity searches for the oriTDB-archived oriT nucleotide sequences and the co-localization of the flanking relaxase homologous genes, the oriTfinder can predict the oriT region with high accuracy in the DNA sequence of a bacterial plasmid or chromosome in minutes. The server also detects the other transfer-related modules, including the potential relaxase gene, T4CP gene and the type IV secretion system gene cluster, and the putative genes coding for virulence factors and acquired antibiotic resistance determinants. oriTfinder may contribute to meeting the increasing demands of re-annotations for bacterial conjugative, mobilizable or non-transferable elements and aid in the rapid risk accession of disease-relevant trait dissemination in pathogenic bacteria of interest. oriTfinder is freely available to all users without any login requirement at http://bioinfo-mml.sjtu.edu.cn/oriTfinder.

  18. 3D Navier-Stokes Flow Analysis for Shared and Distributed Memory MIMD Computers

    DTIC Science & Technology

    1992-09-15

    arithmetical averaged density or Stefan -Boltzmann constant (= 5.67032 x 10-8 ) Oai+1/2 intermediate term for Harten-Yee fluxes - k, O’ constants for k...system of algebraic equations. These equations I are solved using point Gauss- Seidel relaxation. This relaxation scheme is modified to be a lower-upper...interaction of the radiation with the gas. The radiative heat flux per unit area is then I = -(T [EwT - awTdb] (19) Here a is the Stefan Boltzmann

  19. Electronic states of Myricetin. UV-Vis polarization spectroscopy and quantum chemical calculations.

    PubMed

    Vojta, Danijela; Karlsen, Eva Marie; Spanget-Larsen, Jens

    2017-02-15

    Myricetin (3,3',4',5,5',7'-hexahydroxyflavone) was investigated by linear dichroism spectroscopy on molecular samples partially aligned in stretched poly(vinyl alcohol) (PVA). At least five electronic transitions in the range 40,000-20,000cm -1 were characterized with respect to their wavenumbers, relative intensities, and transition moment directions. The observed bands were assigned to electronic transitions predicted with TD-B3LYP/6-31+G(d,p). Copyright © 2016 Elsevier B.V. All rights reserved.

  20. EPM Ephemerides of Planets and the Moon of IAA RAS: their model, accuracy, availability

    NASA Astrophysics Data System (ADS)

    Pitjeva, E. V.; Bratseva, O. A.; Panfilov, V. E.

    2011-10-01

    The current state of the last version of the planet part of EPM's ephemerides of IAA RAS (EPM2010) integrated in the PPN metric over the 1800 - 2200 time interval is presented. The updated dynamical model includes perturbations from all Trans-Neptunian Objects at the mean distance of 43 AU in addition to the perturbations from the major planets, the Moon, the Sun, and asteroids of the main belt. EPM2010 ephemerides have resulted from a least square adjustment to observation data totaling about 620000 position observations of different types. EPM2010 have been oriented onto the ICRF by the inclusion of all VLBI spacecraft observations into the fitting. The uncertainty of EPM ephemerides is controlled by comparison with a prior accuracy of observations and the independent DE421 ephemeris. The differences between the times TT and TDB have been constructed for EPM2004 (that is the basis for the Russian Astronomical Yearbook) and EPM2008 ephemerides. The access to these ephemerides with their TT-TDB are available via ftp://quasar.ipa.nw.ru/incoming/EPM/. This package allows a competent user to obtain the rectangular coordinates of the Sun, Moon, and nine major planets by means of a subroutine written in standard languages Fortran, C, Pascal, Java. Moreover this package gives a possibility to obtain access to ephemerides of Ceres, Pallas, Vesta, Eris, Haumea, Makemake, Sedna constructed simultaneously with the main EPM ephemerides.

  1. Ultrasonographic measurement of fetal growth parameters over three successive pregnancies in a captive Malayan tapir (Tapirus indicus).

    PubMed

    Hoyer, M J; van Engeldorp Gastelaars, H M D

    2014-01-01

    This study was conducted to establish representative curves that allow evaluation of fetal growth and estimation of gestational age from measurement of fetal structures by ultrasound in Malayan tapirs (Tapirus indicus). Three pregnancies (i.e. 3 fetuses) were examined in one female Malayan tapir. Transabdominal ultrasonographic examination was performed without anesthesia from 79 ± 8 days to 281 ± 48 days (mean ± S.D.) post mating. To assess fetal growth attempts were made to measure biparietal diameter (BPD), head length (HL), thorax diameter A (TDA), thorax height A (THA), thorax diameter B (TDB), thorax height B (THB), abdomen diameter (AD), abdomen height (AH), humerus length (HUL) and Crown rump length (CRL). The value of each parameter as an estimator of gestational age was assessed by ease of observation and the length of time the parameter was measurable throughout gestation. The most precise predictors for gestational age in this study were BPD and CRL (weeks 10-20 of gestation), as well as AD and AH (weeks 14-43 of gestation). The parameters TDB, THB and HUL (weeks 15-41 of gestation) gave almost as good predictions. Fetal viability was assessed by identifying a fetal heartbeat and movement. All pregnancies resulted in normal deliveries and healthy offspring. The ultrasound examination was well tolerated by the female. The gestation lengths (399 ± 3 days) were within reported ranges. The serial transabdominal ultrasound, without the need for anesthesia, was an effective method to evaluate fetal growth, development and well being in a Malayan tapir. © 2014 Wiley Periodicals, Inc.

  2. Photometric Analysis and Transit Times of TRAPPIST-1 B and C

    NASA Astrophysics Data System (ADS)

    Morris, Brett M.; Agol, Eric; Hawley, Suzanne L.

    2018-01-01

    TRAPPIST-1 hosts seven Earth-sized planets transiting an M8 star. We observed mid-transit times of each of the inner two planets with the Astrophysical Research Consortium (ARC) 3.5 m Telescope at Apache Point Observatory (APO) to help constrain the planet masses with transit timing variations, and we outline a procedure for analyzing transit observations of late-M stars with APO. The transit times of TRAPPIST-1 b and c are $\\mathrm{BJD}_{\\mathrm{TDB}} = 2457580.87634^{+0.00034}_{-0.00034}$ and $2457558.89477^{+0.00080}_{-0.00085}$, respectively, which will help constrain the planet masses.

  3. User's manual for the National Water-Quality Assessment Program Invertebrate Data Analysis System (IDAS) software, version 5

    USGS Publications Warehouse

    Cuffney, Thomas F.; Brightbill, Robin A.

    2011-01-01

    The Invertebrate Data Analysis System (IDAS) software was developed to provide an accurate, consistent, and efficient mechanism for analyzing invertebrate data collected as part of the U.S. Geological Survey National Water-Quality Assessment (NAWQA) Program. The IDAS software is a stand-alone program for personal computers that run Microsoft Windows(Registered). It allows users to read data downloaded from the NAWQA Program Biological Transactional Database (Bio-TDB) or to import data from other sources either as Microsoft Excel(Registered) or Microsoft Access(Registered) files. The program consists of five modules: Edit Data, Data Preparation, Calculate Community Metrics, Calculate Diversities and Similarities, and Data Export. The Edit Data module allows the user to subset data on the basis of taxonomy or sample type, extract a random subsample of data, combine or delete data, summarize distributions, resolve ambiguous taxa (see glossary) and conditional/provisional taxa, import non-NAWQA data, and maintain and create files of invertebrate attributes that are used in the calculation of invertebrate metrics. The Data Preparation module allows the user to select the type(s) of sample(s) to process, calculate densities, delete taxa on the basis of laboratory processing notes, delete pupae or terrestrial adults, combine lifestages or keep them separate, select a lowest taxonomic level for analysis, delete rare taxa on the basis of the number of sites where a taxon occurs and (or) the abundance of a taxon in a sample, and resolve taxonomic ambiguities by one of four methods. The Calculate Community Metrics module allows the user to calculate 184 community metrics, including metrics based on organism tolerances, functional feeding groups, and behavior. The Calculate Diversities and Similarities module allows the user to calculate nine diversity and eight similarity indices. The Data Export module allows the user to export data to other software packages (CANOCO, Primer

  4. Potential electron mediators to extract electron energies of RBC glycolysis for prolonged in vivo functional lifetime of hemoglobin vesicles.

    PubMed

    Kettisen, Karin; Bülow, Leif; Sakai, Hiromi

    2015-04-15

    Developing a functional blood substitute as an alternative to donated blood for clinical use is believed to relieve present and future blood shortages, and to reduce the risks of infection and blood type mismatching. Hemoglobin vesicle (HbV) encapsulates a purified and concentrated human-derived Hb solution in a phospholipid vesicle (liposome). The in vivo safety and efficacy of HbV as a transfusion alternative have been clarified. Auto-oxidation of ferrous Hb in HbV gradually increases the level of ferric methemoglobin (metHb) and impairs the oxygen transport capabilities. The extension of the functional half-life of HbV has recently been proposed using an electron mediator, methylene blue (MB), which acts as a shuttle between red blood cells (RBC) and HbV. MB transfers electron energies of NAD(P)H, produced by RBC glycolysis, to metHb in HbV. Work presented here focuses on screening of 15 potential electron mediators, with appropriate redox potential and water solubility, for electron transfer from RBC to HbV. The results are assessed with regard to the chemical properties of the candidates. The compounds examined in this study were dimethyl methylene blue (DMB), methylene green, azure A, azure B, azure C, toluidine blue (TDB), thionin acetate, phenazine methosulfate, brilliant cresyl blue, cresyl violet, gallocyanine, toluylene blue, indigo carmine, indigotetrasulfonate, and MB. Six candidates were found to be unsuitable because of their insufficient diffusion across membranes, or overly high or nonexistent reactivity with relevant biomolecules. However, 9 displayed favorable metHb reduction. Among the suitable candidates, phenothiazines DMB and TDB exhibited effectiveness like MB did. In comparison to MB, they showed faster reduction by electron-donating NAD(P)H, coupled with showing a lower rate of reoxidation in the presence of molecular oxygen. Ascertaining the best electron mediator can provide a pathway for extending the lifetime and efficiency of

  5. [Effect of cooling therapy on the heart rate and mean arterial pressure of rats with the second-degree scald burn in hot and humid environment].

    PubMed

    Li, Ya-jie; Zhang, Li-ying; Luo, Bing-de; Li, Yi-lei; Lin, Ni

    2004-03-01

    To observe the changes of heart rate (HR) and mean arterial pressure MAP after immediate cooling therapy (ICT) in rats with superficial second-degree scald burn in hot and humid environment, and assess the effect of the cooling dressing materials. Twenty-four Wistar rats were randomized equally into 4 groups including normal temperature control (NTC) group, normal temperature cooling therapy (NCT) group, hot and humid control (HHC) group and hot and humid cooling therapy (HCT) group. Different interventions were applied as indicated in the rats with superficial second-degree scald burn, with the dry bulb temperature Tdb at 26.33+/-1.29 degrees celsius; and relative humidity (rh) of 71.05%+/-4.57% for two normal temperature groups, and Tdb at 35.33+/-0.35 degrees Celsius; and rh of 70.81%+/-1.38% for the two hot and humid groups. The exposure time was 120 min in NCT and HCT groups, and the HR and MAP were measured every 20 min. MAP is not influenced by environmental temperature and the cooling therapy (P>0.05), whereas HR was higher in HHC than in NTC group and also in HCT than in NCT group (P=0.003), lower in HCT and NCT groups than in HHC and NTC groups (P=0.002), respectively. HR did not undergo any significant changes during the observation in the 4 groups (P>0.05). HR was higher in HHC and HCT than in NTC and NCT groups at 65, 85, 105 and 125 min after the burns, but compared with the two control groups, cooling therapy decreased HR at 5, 25, 45 and 85 min. Cooling therapy does not affect MAP but efficiently decreases HR, which may prevent further heat injury.

  6. Python Leap Second Management and Implementation of Precise Barycentric Correction (barycorrpy)

    NASA Astrophysics Data System (ADS)

    Kanodia, Shubham; Wright, Jason

    2018-01-01

    We announce barycorrpy (BCPy) , a Python implementation to calculate precise barycentric corrections well below the 1 cm/s level, following the algorithm of Wright and Eastman (2014). This level of precision is required in the search for 1 Earth mass planets in the Habitable Zones of Sun-like stars by the Radial Velocity (RV) method, where the maximum semi-amplitude is about 9 cm/s. We have developed BCPy to be used in the pipeline for the next generation Doppler Spectrometers - Habitable-zone Planet Finder (HPF) and NEID. In this work, we also develop an automated leap second management routine to improve upon the one available in Astropy. It checks for and downloads a new leap second file before converting from the UT time scale to TDB.

  7. Constaints on Lorentz symmetry violations using lunar laser ranging observations

    NASA Astrophysics Data System (ADS)

    Bourgoin, Adrien

    2016-12-01

    General Relativity (GR) and the standard model of particle physics provide a comprehensive description of the four interactions of nature. A quantum gravity theory is expected to merge these two pillars of modern physics. From unification theories, such a combination would lead to a breaking of fundamental symmetry appearing in both GR and the standard model of particle physics as the Lorentz symmetry. Lorentz symmetry violations in all fields of physics can be parametrized by an effective field theory framework called the standard-model extension (SME). Local Lorentz Invariance violations in the gravitational sector should impact the orbital motion of bodies inside the solar system, such as the Moon. Thus, the accurate lunar laser ranging (LLR) data can be analyzed in order to study precisely the lunar motion to look for irregularities. For this purpose, ELPN (Ephéméride Lunaire Parisienne Numérique), a new lunar ephemeris has been integrated in the SME framework. This new numerical solution of the lunar motion provides time series dated in temps dynamique barycentrique (TDB). Among that series, we mention the barycentric position and velocity of the Earth-Moon vector, the lunar libration angles, the time scale difference between the terrestrial time and TDB and partial derivatives integrated from variational equations. ELPN predictions have been used to analyzed LLR observations. In the GR framework, the residuals standard deviations has turned out to be the same order of magnitude compare to those of INPOP13b and DE430 ephemerides. In the framework of the minimal SME, LLR data analysis provided constraints on local Lorentz invariance violations. Spetial attention was paid to analyze uncertainties to provide the most realistic constraints. Therefore, in a first place, linear combinations of SME coefficients have been derived and fitted to LLR observations. In a second time, realistic uncertainties have been determined with a resampling method. LLR data

  8. Fluorescence emission of disperse Red 1 in solution at room temperature.

    PubMed

    Toro, Carlos; Thibert, Arthur; De Boni, Leonardo; Masunov, Artëm E; Hernández, Florencio E

    2008-01-24

    In this article, we report the fluorescence emission of Disperse Red 1 in solution at room temperature and pumping at 532 nm with a 25 mW diode laser. We have measured its fluorescence quantum yield in methanol, ethylene glycol, glycerol, and phenol obtaining values as high as 10(-3) in the aliphatic alcohols. The excitation spectra of Disperse Red 1 in all four solvents as well as its excitation anisotropy in glycerol are presented. Applying a Gaussian decomposition method to the absorption spectra along with the support from the excitation spectra, the positions of the different transitions in this pseudo-stilbene azobenzene dye were determined. Solvatochromic and isomerization constraint effects are discussed. Calculations using density functional theory at TD-B3LYP/6-31G*//HF/6-31G* level were performed to interpret the experimental observations.

  9. Postural control of typical developing boys during the transition from double-leg stance to single-leg stance.

    PubMed

    Deschamps, Kevin; Staes, Filip; Peerlinck, Kathelijne; Van Geet, Kristel; Hermans, Cedric; Lobet, Sebastien

    2017-02-01

    Literature is lacking information about postural control performance of typically developing children during a transition task from double-leg stance to single-leg stance. The purpose of the present study was therefore to evaluate the clinical feasibility of a transition task in typical developing age groups as well as to study the correlation between associated balance measures and age.Thirty-three typically developing boys aged 6-20 years performed a standard transition task from DLS to SLS with eyes open (EO) and eyes closed (EC). Balance features derived from the center of pressure displacement captured by a single force platform were correlated with age on the one hand and considered for differences in the perspective of limb dominance on the other hand.All TDB (typically developing boys) were able to perform the transition task with EO. With respect to EC condition, all TDB from the age group 6-7 years and the youngest of the age group 8-12 years (N = 4) were unable to perform the task. No significant differences were observed between the balance measures of the dominant and non-dominant limbs.With respect to EO condition, correlation analyses indicated that time to new stability point (TNSP) as well as the sway measure after this TNSP were correlated with age (p < 0.0001). For the EC condition, only the anthropometrically scaled sway measure was found to be correlated (p = 0.03). The results provide additional insight into balance development in childhood and may serve as a useful basis for assessing balance impairments in higher functioning children with musculoskeletal problems. What is Known: • Reference data regarding postural balance of typically developing children during walking, running, sit-to-stand, and bipodal and unipodal stance has been well documented in the literature. • These reference data provided not only insight into the maturation process of the postural control system, but also served in diagnosing and managing functional

  10. Transient thermal stress problem for a circumferentially cracked hollow cylinder

    NASA Technical Reports Server (NTRS)

    Nied, H. F.; Erdogan, F.

    1982-01-01

    The transient thermal stress problem for a hollow elasticity cylinder containing an internal circumferential edge crack is considered. It is assumed that the problem is axisymmetric with regard to the crack geometry and the loading, and that the inertia effects are negligible. The problem is solved for a cylinder which is suddenly cooled from inside. First the transient temperature and stress distributions in an uncracked cylinder are calculated. By using the equal and opposite of this thermal stress as the crack surface traction in the isothermal cylinder the crack problem is then solved and the stress intensity factor is calculated. The numerical results are obtained as a function of the Fourier number tD/b(2) representing the time for various inner-to-outer radius ratios and relative crack depths, where D and b are respectively the coefficient of diffusivity and the outer radius of the cylinder.

  11. Molecular structure, natural bond analysis, vibrational and electronic spectra, surface enhanced Raman scattering and Mulliken atomic charges of the normal modes of [Mn(DDTC)2] complex.

    PubMed

    Téllez S, Claudio A; Costa, Anilton C; Mondragón, M A; Ferreira, Glaucio B; Versiane, O; Rangel, J L; Lima, G Müller; Martin, A A

    2016-12-05

    Theoretical and experimental bands have been assigned for the Fourier Transform Infrared and Raman spectra of the bis(diethyldithiocarbamate)Mn(II) complex, [Mn(DDTC)2]. The calculations have been based on the DFT/B3LYP method, second derivative spectra and band deconvolution analysis. The UV-vis experimental spectra were measured in acetonitrile solution, and the calculated electronic spectrum was obtained using the TD/B3LYP method with 6-311G(d, p) basis set for all atoms. Charge transfer bands and those d-d spin forbidden were assigned in the UV-vis spectrum. The natural bond orbital analysis was carried out using the DFT/B3LYP method and the Mn(II) hybridization leading to the planar geometry of the framework was discussed. Surface enhanced Raman scattering (SERS) was also performed. Mulliken charges of the normal modes were obtained and related to the SERS enhanced bands. Copyright © 2016 Elsevier B.V. All rights reserved.

  12. MSDB: A Comprehensive Database of Simple Sequence Repeats

    PubMed Central

    Avvaru, Akshay Kumar; Saxena, Saketh; Mishra, Rakesh Kumar

    2017-01-01

    Abstract Microsatellites, also known as Simple Sequence Repeats (SSRs), are short tandem repeats of 1–6 nt motifs present in all genomes, particularly eukaryotes. Besides their usefulness as genome markers, SSRs have been shown to perform important regulatory functions, and variations in their length at coding regions are linked to several disorders in humans. Microsatellites show a taxon-specific enrichment in eukaryotic genomes, and some may be functional. MSDB (Microsatellite Database) is a collection of >650 million SSRs from 6,893 species including Bacteria, Archaea, Fungi, Plants, and Animals. This database is by far the most exhaustive resource to access and analyze SSR data of multiple species. In addition to exploring data in a customizable tabular format, users can view and compare the data of multiple species simultaneously using our interactive plotting system. MSDB is developed using the Django framework and MySQL. It is freely available at http://tdb.ccmb.res.in/msdb. PMID:28854643

  13. Synthesis, spectroscopic properties and theoretical studies of bis-Schiff bases derived from polyamine and pyrazolones.

    PubMed

    Ren, Tiegang; Liu, Shuyun; Li, Guihui; Zhang, Jinglai; Guo, Jia; Li, Weijie; Yang, Lirong

    2012-11-01

    A series of novel bis-Schiff base were synthesized from 1-aryl-3-methyl-4-benzoyl-5-pyrazolones and diethylenetriamine (or triethylenetetramine) as the starting materials. All of these bis-Schiff bases were characterized by means of NMR, IR, and MS. The UV-vis absorption spectra and fluorescent spectra of these bis-Schiff bases were also measured. Moreover, the B3LYP/6-31G(d) method was used to optimize the ground state geometry of the bis-Schiff bases; and the UV-vis spectroscopic properties of the products were computed and compared with corresponding experimental data based on cc-pVDZ basis set of TD-B3LYP method. It has been found that all of these bis-Schiff bases show a remarkable absorption peak in a wavelength range of 270-340 nm; and their maximum emission peaks are around 348 nm. Copyright © 2012 Elsevier B.V. All rights reserved.

  14. Electronic spectra and DFT calculations of some pyrimido[1,2-a]benzimidazole derivatives

    NASA Astrophysics Data System (ADS)

    Elshakre, Mohamed E.; Moustafa, H.; Hassaneen, Huwaida. M. E.; Moussa, Abdelrahim. Z.

    2015-06-01

    Ground state properties of 2,4-diphenyl-1,4-dihydrobenzo[4,5]imidazo[1,2-a]pyrimidine, compound 1, and its derivatives are investigated experimentally and theoretically in Dioxane and DMF. The calculations show that all the studied compounds (1-7) are non-planar, resulting in a significant impact on the electronic and structural properties. The ground state properties of compounds 1-7 at B3LYP/6-311G (d, p) show that compound 5 has the lowest EHOMO, ELUMO, and ΔE indicating highest reactivity. Compound 7 is found to have the highest polarity. The observed UV spectra in Dioxane and DMF of compounds 1-4 show 2 bands, while compounds 5-7 show 4 bands in both solvents. Band maxima (λmax) and intensities of the spectra are found to have solvent dependence reflected as blue and red shifts. The theoretical spectra computed at TD-B3LYP/6-311G (d, p) in gas phase, Dioxane and DMF indicate a good agreement with the observed spectra.

  15. High-resolution, vacuum-ultraviolet absorption spectrum of boron trifluoride

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, Patrick P.; Thompson, Alan K.; Vest, Robert E.

    2014-11-21

    In the course of investigations of thermal neutron detection based on mixtures of {sup 10}BF{sub 3} with other gases, knowledge was required of the photoabsorption cross sections of {sup 10}BF{sub 3} for wavelengths between 135 and 205 nm. Large discrepancies in the values reported in existing literature led to the absolute measurements reported in this communication. The measurements were made at the SURF III Synchrotron Ultraviolet Radiation Facility at the National Institute of Standards and Technology. The measured absorption cross sections vary from 10{sup −20} cm{sup 2} at 135 nm to less than 10{sup −21} cm{sup 2} in the regionmore » from 165 to 205 nm. Three previously unreported absorption features with resolvable structure were found in the regions 135–145 nm, 150–165 nm, and 190–205 nm. Quantum mechanical calculations, using the TD-B3LYP/aug-cc-pVDZ variant of time-dependent density functional theory implemented in Gaussian 09, suggest that the observed absorption features arise from symmetry-changing adiabatic transitions.« less

  16. Design of geometry, synthesis, spectroscopic (FT-IR, UV/Vis, excited state, polarization) and anisotropy (thermal conductivity and electrical) properties of new synthesized derivatives of (E,E)-azomethines in colored stretched poly (vinyl alcohol) matrix

    NASA Astrophysics Data System (ADS)

    Shahab, Siyamak; Sheikhi, Masoome; Filippovich, Liudmila; Dikusar, Evgenij; Yahyaei, Hooriye; Kumar, Rakesh; Khaleghian, Mehrnoosh

    2018-04-01

    In the present work, the molecular structures of two new azomethine dyes: have been predicted and investigated using Density Functional Theory (DFT) in dimethylformamide (DMF). The geometries of the azomethine dyes were optimized by B3LYP/6-31+G* level of theory. The electronic spectra of these azomethine dyes in a DMF solvent was carried out by using TD-B3LYP/6-31+G* method. After quantum-chemical calculations two new azomethine dyes for optoelectronic applications were synthesized. FT-IR spectra of the title compounds are recorded and discussed. The computed absorption spectral data of the azomethine dyes are in good agreement with the experimental data, thus allowing an assignment of the UV/Vis spectra. On the basis of polyvinyl alcohol (PVA) and the new synthesized azomethine dyes polarizing films for visible region of spectrum were developed. The main optical parameters of the polarizing PVA-films (Transmittance, Polarization Efficiency and Dichroic Ratio) have been measured and discussed. Anisotropy of thermal and electrical conductivity of the PVA-films have been studied and explained.

  17. VizieR Online Data Catalog: Minima of 41 binaries from entire Kepler mission (Gies+, 2015)

    NASA Astrophysics Data System (ADS)

    Gies, D. R.; Matson, R. A.; Guo, Z.; Lester, K. V.; Orosz, J. A.; Peters, G. J.

    2016-06-01

    We embarked on a search for eclipse timing variations among a subset of 41 eclipsing binaries that were identified prior to the start of Kepler observations (see our first paper, Gies et al. 2012, cat. J/AJ/143/137). Our first paper documented the eclipse times in observations made over quarters Q0-Q9 (2009.3-2011.5). Now with the Kepler mission complete with observations through Q17 (ending 2013.4), we present here the eclipse timings for our sample of 41 binaries over the entire duration of the mission. The associated times given in our first paper were based upon UTC (Coordinated Universal Time) while the current set uses TDB (Barycentric Dynamical Time), and here we report the times in reduced Barycentric Julian Date (BJD-2400000 days). We used the Simple Aperture Photometry (SAP) flux except in the case of KIC04678873. The list of targets appears in Table1. The eclipse timing measurements were made in almost the same way as described in our first paper. Our measurements appear in Table2. (2 data files).

  18. MSDB: A Comprehensive Database of Simple Sequence Repeats.

    PubMed

    Avvaru, Akshay Kumar; Saxena, Saketh; Sowpati, Divya Tej; Mishra, Rakesh Kumar

    2017-06-01

    Microsatellites, also known as Simple Sequence Repeats (SSRs), are short tandem repeats of 1-6 nt motifs present in all genomes, particularly eukaryotes. Besides their usefulness as genome markers, SSRs have been shown to perform important regulatory functions, and variations in their length at coding regions are linked to several disorders in humans. Microsatellites show a taxon-specific enrichment in eukaryotic genomes, and some may be functional. MSDB (Microsatellite Database) is a collection of >650 million SSRs from 6,893 species including Bacteria, Archaea, Fungi, Plants, and Animals. This database is by far the most exhaustive resource to access and analyze SSR data of multiple species. In addition to exploring data in a customizable tabular format, users can view and compare the data of multiple species simultaneously using our interactive plotting system. MSDB is developed using the Django framework and MySQL. It is freely available at http://tdb.ccmb.res.in/msdb. © The Author 2017. Published by Oxford University Press on behalf of the Society for Molecular Biology and Evolution.

  19. Crystal structure characterization as well as theoretical study of spectroscopic properties of novel Schiff bases containing pyrazole group.

    PubMed

    Guo, Jia; Ren, Tiegang; Zhang, Jinglai; Li, Guihui; Li, Weijie; Yang, Lirong

    2012-09-01

    A series of novel Schiff bases containing pyrazole group were synthesized using 1-aryl-3-methyl-4-benzoyl-5-pyrazolone and phenylenediamine as the starting materials. All as-synthesized Schiff bases were characterized by means of NMR, FT-IR, and MS; and the molecular geometries of two Schiff bases as typical examples were determined by means of single crystal X-ray diffraction. In the meantime, the ultraviolet-visible light absorption spectra and fluorescent spectra of various as-synthesized products were also measured. Moreover, the B3LYP/6-1G(d,p) method was used for the optimization of the ground state geometry of the Schiff bases; and the spectroscopic properties of the products were computed and compared with corresponding experimental data based on cc-pVTZ basis set of TD-B3LYP method. It has been found that all as-synthesized Schiff bases show a remarkable absorption peak in a wavelength range of 270-370 nm; and their maximum emission peaks are around 344 nm and 332 nm, respectively. Copyright © 2012 Elsevier B.V. All rights reserved.

  20. Progress report of the IAU Commission 4 Working Group on Ephemeris Access and the comparison of high accuracy planetary ephemerides

    NASA Astrophysics Data System (ADS)

    Hilton, J. L.

    2012-12-01

    In September 2010 IAU Commission 4, Ephemerides, organized a working group to provide a recommendation for a preferred format for solar system ephemerides. The purpose of this recommendation is to provide easy access to a wide range of solar system ephemerides for users. The working group, chaired by Hilton, includes representatives from each of the major planetary ephemeris groups and representatives from the satellite and asteroid ephemeris communities. The working group has tentatively decided to recommend the SPK format developed by the Jet Propulsion Laboratory's Navigation and Ancillary Information Facility for use with its SPICE Toolkit. Certain details, however, must still be resolved before a final recommendation is made by the working group. An update is also provided to ongoing analysis comparing the three high accuracy planetary ephemerides, DE421, EPM2008, and INPOP10a. The principal topics of this update are: replacing the INPOP08 ephemeris with the INPOP10a ephemeris, making the comparisons with respect to DE421 rather than DE405, and comparing the TT - TDB values determined in EPM2008 and INPOP10a with the Fairhead & Bretagnon (1990, A&A, 229, 240) model used in DE421 as T_eph.

  1. Rework of the ERA software system: ERA-8

    NASA Astrophysics Data System (ADS)

    Pavlov, D.; Skripnichenko, V.

    2015-08-01

    The software system that has been powering many products of the IAA during decades has undergone a major rework. ERA has capabilities for: processing tables of observations of different kinds, fitting parameters to observations, integrating equations of motion of the Solar system bodies. ERA comprises a domain-specific language called SLON, tailored for astronomical tasks. SLON provides a convenient syntax for reductions of observations, choosing of IAU standards to use, applying rules for filtering observations or selecting parameters for fitting. Also, ERA includes a table editor and a graph plotter. ERA-8 has a number of improvements over previous versions such as: integration of the Solar system and TT xA1 TDB with arbitrary number of asteroids; option to use different ephemeris (including DE and INPOP); integrator with 80-bit floating point. The code of ERA-8 has been completely rewritten from Pascal to C (for numerical computations) and Racket (for running SLON programs and managing data). ERA-8 is portable across major operating systems. The format of tables in ERA-8 is based on SQLite. The SPICE format has been chosen as the main format for ephemeris in ERA-8.

  2. A control method of the rotor re-levitation for different orbit responses during touchdowns in active magnetic bearings

    NASA Astrophysics Data System (ADS)

    Lyu, Mindong; Liu, Tao; Wang, Zixi; Yan, Shaoze; Jia, Xiaohong; Wang, Yuming

    2018-05-01

    Touchdown can make active magnetic bearings (AMB) unable to work, and bring severe damages to touchdown bearings (TDB). To resolve it, we presents a novel re-levitation method consisting of two operations, i.e., orbit response recognition and rotor re-levitation. In the operation of orbit response recognition, the three orbit responses (pendulum vibration, combined rub and bouncing, and full rub) can be identified by the expectation of radial displacement of rotor and expectation of instantaneous frequency (IF) of rotor motion in the sampling period. In the rotor re-levitation operation, a decentralized PID control algorithm is employed for pendulum vibration and combined rub and bouncing, and the decentralized PID control algorithm and another whirl damping algorithm, in which the weighting factor is determined by the whirl frequency, are jointly executed for the full rub. The method has been demonstrated by the simulation results of an AMB model. The results reveal that the method is effective in actively suppressing the whirl motion and promptly re-levitating the rotor. As the PID control algorithm and the simple operations of signal processing are employed, the algorithm has a low computation intensity, which makes it more easily realized in practical applications.

  3. Naphthalene emissions from moth repellents or toilet deodorant blocks determined using head-space and small-chamber tests.

    PubMed

    Jo, Wan-Kuen; Lee, Jong-Hyo; Lim, Ho-Jin; Jeong, Woo-Sik

    2008-01-01

    The present study investigated the emissions of naphthalene and other compounds from several different moth repellents (MRs) and one toilet deodorant block (TDB) currently sold in Korea, using a headspace analysis. The emission factors and emission rates of naphthalene were studied using a small-scale environmental chamber. Paper-type products emitted a higher concentration of the total volatile organic compounds (VOCs) (normalized to the weight of test piece) than ball-type products, which in turn emitted higher concentration than a gel-type product. In contrast, naphthalene was either the most or the second highest abundant compound for the four ball products, whereas for paper and gel products it was not detected or was detected at much lower levels. The abundance of naphthalene ranged between 18.4% and 37.3% for ball products. The results showed that the lower the air changes per hour (ACH) level was, the higher the naphthalene concentrations became. In general, a low ACH level suggests a low ventilation rate. The emission factor for naphthalene was nearly 100 times higher for a ball MR than for a gel or a paper MR. For the ball MR, the lower ACH level resulted in higher emission rate.

  4. "CH"/N substituted mer-Gaq3 and mer-Alq3 derivatives: an effective approach for the tuning of emitting color.

    PubMed

    Gahungu, Godefroid; Zhang, Jingping

    2005-09-22

    Equilibrium geometry configurations of the "CH"/N substituted Alq3 and Gaq3 derivatives are calculated by density functional theory (B3LYP/6-31G). The frontier molecular orbital and gap energy calculations for all complexes have been performed at the HF/6-31G level. It was shown that, compared to the pristine molecules, the HOMO and LUMO are stabilized, the net effect being however an increasing/decreasing of the gap (Eg) depending on the position of the substituted group. On the basis of the equilibrium geometries, the effect of the substitution on the absorption and emission spectra was evaluated using TDB3LYP/3-21G. It was shown that the change of "CH"/N substituted position on 8-hydroxyquinoline ligand is a powerful approach for the tuning of emitting color. An important blue shift was predicted for 5-substituted 8-hydroxyquinoline derivatives, an important red one being observed for 4-substituted ones. Interestingly, relatively significant blue and red shifts were also predicted for the 7- and 2-substituted derivatives. In this work, the correlation between the spectrum shifts and the metal-ligand bonding is also discussed.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zavarin, Mavrik; Joseph, C.

    This progress report (Level 4 Milestone Number M4FT-16LL080303052) summarizes research conducted at Lawrence Livermore National Laboratory (LLNL) within the Crystalline Disposal R&D Activity Number FT-16LL080303051 and Crystalline International Collaborations Activity Number FT-16LL080303061. The focus of this research is the interaction of radionuclides with Engineered Barrier System (EBS) and host rock materials at various physico-chemical conditions relevant to subsurface repository environments. They include both chemical and physical processes such as solubility, sorption, and diffusion. The colloid-facilitated transport effort focused on preparation of a draft manuscript summarizing the state of knowledge and parameterization of colloid-facilitated transport mechanisms in support of reactive transportmore » and performance assessment models for generic crystalline repositories. This draft manuscript is being submitted as a level 3 milestone with LANL as the primary author. LLNL’s contribution to that effort is summarized only briefly in the present report. A manuscript summarizing long-term U(VI) diffusion experiments through bentonite backfill material was recently accepted for publication; the contents of that manuscript are summarized in the present report. The Np(IV) diffusion experiments were started mid-year and are ongoing. The completion of these experiments is planned for early FY17. Our progress in quantifying Np(IV) diffusion in bentonite backfill is summarized in the present report. Our involvement with the NEA TDB project was summarized in a recent Argillite Disposal activity report. It is not included in this report.« less

  6. TRANSPORT AND FATE OF NITRATE AND PATHOGENS AT A DAIRY LAGOON WATER APPLICATION SITE: AN ASSESSMENT OF CNMP PERFORMANCE (GWERD IAG WITH USDA-ARS, #TDB)

    EPA Science Inventory

    EPA currently requires that application of Concentrated Animal Feeding Operation (CAFO) wastes to agricultural fields follows a Comprehensive Nutrient Management Plan (CNMP). The tacit assumption is that a well designed and executed CNMP ensures that all lagoon water contaminants...

  7. Geometry optimization and excited state properties of the new symmetric (E)-Stilbene derivative for application in thermostable polarizing PVA-films: A combined experimental and DFT approach

    NASA Astrophysics Data System (ADS)

    Shahab, Siyamak; Almodarresiyeh, Hora Alhosseini; Filippovich, Liudmila; Hajikolaee, Fatemeh Haji; Kumar, Rakesh; Darroudi, Mahdieh; Mashayekhi, Mahsa

    2016-09-01

    In the present work, quantum-chemical calculations used for the structural analysis of the new symmetric (E)-Stilbene derivative: (Potassium 2,2‧-((ethane-1,2-diylbis(4,1-phenylene))bis(azanediyl))diacetate) (P) (Trans isomer) using DFT/B3LYP/LanL2MB level of theory. The FT-IR and 1H NMR spectra of the compound P are presented. The electronic absorption spectrum of the P in aqueous medium was calculated using TDB3LYP/LanL2MB method. The excitation energies, electronic transitions and oscillator strengths for studied structure have also been calculated. The experimental, calculated UV/Vis and emission spectra of the P are presented and discussed. The geometry optimization of the molecule P in excited state and its electronic spectrum was carried out by the same method. In excited state the molecule P loses its symmetry and becomes unstable form. First time on the basis of polyvinyl alcohol (PVA) and the new designed structure P thermostable polarizing film absorbing at λmax = 410 nm was created. Polarizing Efficiency (PE) of obtained film is 96% at Stretching Degree (Rs) 3.0. In oriented PVA-films is the phenomenon of anisotropy of thermal conductivity (λ||/λ⊥) which is very important for development of thermostable polarizing films.

  8. Contact dynamic phenomena in rotating machines: Active/passive considerations

    NASA Astrophysics Data System (ADS)

    Keogh, Patrick S.

    2012-05-01

    There are machine operating regimes in which rotor/stator interactions may lead to problematic rotor dynamic behavior. For example, dynamic heat sources arising from seals, bearings and other rubbing stator components may cause rotor thermal bend instability. In active magnetic bearing (AMB) systems, the rotor may experience forward and backward whirl rubs with touchdown bearings (TDBs). In abnormal cases, rotor transient and bounce interactions with such bearings may involve highly localized and short duration contacts. This paper discusses certain contact phenomena that may occur in passive and active systems. For example, the rub induced spiral behavior arises from a combination of unbalance and a thermal input that moves slowly around the rotor, typically in passive rotor-bearing systems. However, the instability can be regarded as if arising from a closed-loop feedback system. Hence it is possible to analyze the phenomenon using techniques that have been developed for active control systems. Rotors levitated by AMBs are truly active, but there are fundamental issues that may arise when contact with TDBs occurs. AMB control and contact interactions are discussed together with the benefits for making the TDB an active element. The reason for this lies in the potential ability to control the contact dynamics and associated mechanical and thermal stresses. A prototype system is described.

  9. Thermal comparison of aircrew clothing aboard OV-10 aircraft.

    PubMed

    Constable, R; Webster, R L; Nunneley, S A

    1988-12-01

    Thermal evaluation of aircrew clothing in the field usually involves conditions which make it difficult to distinguish clothing effects from other, confounding factors. This paper reports a field study designed to solve this problem. The question concerned possible heat stress effects caused by adding an oxygen mask, an anti-g suit, or both to the usual clothing worn by pilots of OV-10 (twin turboprop) aircraft during 20 hot-weather flights (actual experimental temperatures of Tdb = 28-38 degrees C, rh = 18-20%). The four test ensembles were flown simultaneously, allowing side-by-side comparison to compensate for variations in flight profile and weather. Subjects (n = 10) encountered noticeable heat stress in flight, with rectal temperature = 37.4-37.6 degrees C, skin temperature = 35.0-35.5 degrees C, and weight losses = 2.1-2.4 kg. There were no measurable differences among the four clothing outfits, indicating that the anti-g suit does not present a heat stress problem. The mask and anti-g suit did contribute to aircrew discomfort as their impermeable materials prevented evaporation of sweat and caused 100% skin wetting in covered areas. Under these dry, desert conditions, the body was apparently able to compensate for the loss of evaporative surface area.

  10. Absorption spectrum of the firefly luciferin anion isolated in vacuo.

    PubMed

    Støchkel, Kristian; Milne, Bruce F; Brøndsted Nielsen, Steen

    2011-03-24

    The excited-state physics of the firefly luciferin anion depends on its chemical environment, and it is therefore important to establish the intrinsic behavior of the bare ion. Here we report electronic absorption spectra of the anion isolated in vacuo obtained at an electrostatic ion storage ring and an accelerator mass spectrometer where ionic dissociation is monitored on a long time scale (from 33 μs and up to 3 ms) and on a short time scale (0-3 μs), respectively. In the ring experiment the yield of all neutrals (mainly CO(2)) as a function of wavelength was measured whereas in the single pass experiment, the abundance of daughter ions formed after loss of CO(2) was recorded to provide action spectra. We find maxima at 535 and 265 nm, and that the band shape is largely determined by the sampling time interval, which is due to the kinetics of the dissociation process. Calculations at the TD-B3LYP/TZVPP++ level predict maximum absorption at 533 and 275 nm for the carboxylate isomer in excellent agreement with the experimental findings. The phenolate isomer lies higher in energy by 0.22 eV, and also its absorption maximum is calculated to be at 463 nm, which is far away from the experimental value. Our data serve to benchmark future theoretical models for bioluminescence from fireflies.

  11. Coordination and Hydrolysis of Plutonium Ions in Aqueous Solution using Car-Parrinello Molecular Dynamics Free Energy Simulations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Odoh, Samuel O.; Bylaska, Eric J.; De Jong, Wibe A.

    Car-Parrinello molecular dynamics (CPMD) simulations have been used to examine the hydration structures, coordination energetics and the first hydrolysis constants of Pu3+, Pu4+, PuO2+ and PuO22+ ions in aqueous solution at 300 K. The coordination numbers and structural properties of the first shell of these ions are in good agreement with available experimental estimates. The hexavalent PuO22+ species is coordinated to 5 aquo ligands while the pentavalent PuO2+ complex is coordinated to 4 aquo ligands. The Pu3+ and Pu4+ ions are both coordinated to 8 water molecules. The first hydrolysis constants obtained for Pu3+ and PuO22+ are 6.65 and 5.70more » respectively, all within 0.3 pH units of the experimental values (6.90 and 5.50 respectively). The hydrolysis constant of Pu4+, 0.17, disagrees with the value of -0.60 in the most recent update of the Nuclear Energy Agency Thermochemical Database (NEA-TDB) but supports recent experimental findings. The hydrolysis constant of PuO2+, 9.51, supports the experimental results of Bennett et al. (Radiochim. Act. 1992, 56, 15). A correlation between the pKa of the first hydrolysis reaction and the effective charge of the plutonium center was found.« less

  12. Hypervolemia During Drinking of ISO and Hypertonic Fluids by Men at Rest and Exercise

    NASA Technical Reports Server (NTRS)

    Greenleaf, J. E.; Looft-Wilson, R.; Wisherd, J. L.; Fung, P. P.; Erti, A. C.; Jackson, C. G. R.; Barnes, P. R.; Wong, L. G.

    1994-01-01

    To test the hypothesis that drink composition is more important than osmolality (osm) for maintaining and increasing plasma vol. (PV, hypervolemia) at rest and exercise (21.8C Tdb, 50% rh), 6 men (22-39 vr) underwent six treatments while sitting for 90 min (0.39 l/min) followed by 70 min of sitting ergometer exercise (2.08 l/min, 70%vO2 peak). Resting, intermittent drinking (10 ml/kg, 768 ml) beverages were: P1 (20 mEq Na+, 365 mosmol/kg), P2 (40 mEq Na+. 791 mosm), P2G (40 mEq Na+, 80 ml glycerol, 1.392 mosm). AA (157 mEq Na+, 253 mosm), and 01 and 02 (nothing). The exercise drink (10 ml/kg, 768 ml) was P1 for all experiments, except 02 (nothing). Resting % delta PV (Hb-Hct) increased (P<0.05) by 3-6% only with P2 and AA, respectively, Exercise % delta PV was + 1 to + 3% (NS) with AA, -6% to 0% (KS) with P1, P2. P2G, and 01,and 8% to -5% (P<0.05) with 02- Thus, AA with 157 mEq Na+ and the lowest osmolality maintained PV at rest and exercise, while the other beverages with low Na+ and higher osmolality (365 to 1.382 mosm) did not.

  13. Trehalose diester glycolipids are superior to the monoesters in binding to Mincle, activation of macrophages in vitro and adjuvant activity in vivo.

    PubMed

    Huber, Alexandra; Kallerup, Rie S; Korsholm, Karen S; Franzyk, Henrik; Lepenies, Bernd; Christensen, Dennis; Foged, Camilla; Lang, Roland

    2016-08-01

    The T-cell adjuvanticity of mycobacterial cord factor trehalose 6,6'-dimycolate (TDM) is well established. The identification of the C-type lectin Mincle on innate immune cells as the receptor for TDM and its synthetic analogue trehalose 6,6'-dibehenate (TDB) has raised interest in development of synthetic Mincle ligands as novel adjuvants. Trehalose mono- (TMXs) and diesters (TDXs) with symmetrically shortened acyl chains [denoted by X: arachidate (A), stearate (S), palmitate (P), and myristate (M)] were tested. Upon stimulation of murine macrophages, G-CSF secretion and NO production were strongly augmented by all TDXs tested, in a wide concentration range. In contrast, the TMXs triggered macrophage activation only at high concentrations. Macrophage activation by all TDXs required Mincle, but was independent of MyD88. The superior capacity of TDXs for activating macrophages was paralleled by direct binding of TDXs, but not of TMXs, to a Mincle-Fc fusion protein. Insertion of a short polyethylene glycol between the sugar and acyl chain in TDS reduced Mincle-binding and macrophage activation. Immunization of mice with cationic liposomes containing the analogues demonstrated the superior adjuvant activity of trehalose diesters. Overall, immune activation in vitro and in vivo by trehalose esters of simple fatty acids requires two acyl chains of length and involves Mincle. © The Author(s) 2016.

  14. A SEARCH FOR WATER IN THE ATMOSPHERE OF HAT-P-26b USING LDSS-3C

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevenson, Kevin B.; Bean, Jacob L.; Seifahrt, Andreas

    2016-02-01

    The characterization of a physically diverse set of transiting exoplanets is an important and necessary step toward establishing the physical properties linked to the production of obscuring clouds or hazes. It is those planets with identifiable spectroscopic features that can most effectively enhance our understanding of atmospheric chemistry and metallicity. The newly commissioned LDSS-3C instrument on Magellan provides enhanced sensitivity and suppressed fringing in the red optical, thus advancing the search for the spectroscopic signature of water in exoplanetary atmospheres from the ground. Using data acquired by LDSS-3C and the Spitzer Space Telescope, we search for evidence of water vapormore » in the transmission spectrum of the Neptune-mass planet HAT-P-26b. Our measured spectrum is best explained by the presence of water vapor, a lack of potassium, and either a high-metallicity, cloud-free atmosphere or a solar-metallicity atmosphere with a cloud deck at ∼10 mbar. The emergence of multi-scale-height spectral features in our data suggests that future observations at higher precision could break this degeneracy and reveal the planet’s atmospheric chemical abundances. We also update HAT-P-26b’s transit ephemeris, t{sub 0} = 2455304.65218(25) BJD{sub TDB}, and orbital period, p = 4.2345023(7) days.« less

  15. Ultra rapidly dissolving repaglinide nanosized crystals prepared via bottom-up and top-down approach: influence of food on pharmacokinetics behavior.

    PubMed

    Gadadare, Rahul; Mandpe, Leenata; Pokharkar, Varsha

    2015-08-01

    The present work was undertaken with the objectives of improving the dissolution velocity, related oral bioavailability, and minimizing the fasted/fed state variability of repaglinide, a poorly water-soluble anti-diabetic active by exploring the principles of nanotechnology. Nanocrystal formulations were prepared by both top-down and bottom-up approaches. These approaches were compared in light of their ability to provide the formulation stability in terms of particle size. Soluplus® was used as a stabilizer and Kolliphor™ E-TPGS was used as an oral absorption enhancer. In vitro dissolution profiles were investigated in distilled water, fasted and fed state simulated gastric fluid, and compared with the pure repaglinide. In vivo pharmacokinetics was performed in both the fasted and fed state using Wistar rats. Oral hypoglycemic activity was also assessed in streptozotocin-induced diabetic rats. Nanocrystals TD-A and TD-B showed 19.86 and 25.67-fold increase in saturation solubility, respectively, when compared with pure repaglinide. Almost 10 (TD-A) and 15 (TD-B)-fold enhancement in the oral bioavailability of nanocrystals was observed regardless of the fasted/fed state compared to pure repaglinide. Nanocrystal formulations also demonstrated significant (p < 0.001) hypoglycemic activity with faster onset (less than 30 min) and prolonged duration (up to 8 h) compared to pure repaglinide (after 60 min; up to 4 h, respectively).

  16. Antimicrobial activities, DNA interactions, spectroscopic (FT-IR and UV-Vis) characterizations, and DFT calculations for pyridine-2-carboxylic acid and its derivates

    NASA Astrophysics Data System (ADS)

    Tamer, Ömer; Tamer, Sevil Arabacı; İdil, Önder; Avcı, Davut; Vural, Hatice; Atalay, Yusuf

    2018-01-01

    In this paper, pyridine- 2- carboxylic acid, also known as picolinic acid (pic), and its two derivate, 4- methoxy-pyridine- 2- carboxylic acid (4-Mpic) and 4- chloro-pyridine- 2- carboxylic acid (4-Clpic) have been characterized by FT-IR and UV-Vis spectroscopy techniques as well as DFT calculations. B3LYP level of Density Functional Theory (DFT) method was used to obtain ground state geometries, vibration wavenumbers, first order hyperpolarizabilities and molecular electrostatic potential (MEP) surfaces for pic, 4Clpic and 4Mpic. The electronic absorption wavelengths and HOMO-LUMO energies were investigated by time dependent B3LYP (TD-B3LYP) level with the conductor-like polarizable continuum model (CPCM). The effects of Cl atom and OCH3 group on HOMO-LUMO energy gaps and first order hyperpolarizability parameters of pic, 4Clpic and 4Mpic molecules were examined. All molecules were screened for their antibacterial activities against Gram-positive and Gram-negative bacteria and for their antifungal activities against yeast strains by using minimal inhibitory concentration method (MIC). All compounds (pic, 4Mpic and 4Clpic) have been found to be very active against to the Gram (+) and Gram (-) bacteria. The DNA interactions of pic, 4Clpic and 4Mpic were analyzed by molecular docking simulations, and the interaction of the 4Mpic molecule with DNA is found to be higher than 4Clpic and pic.

  17. Theoretical studies on the electronic structure and spectroscopic properties of transition metals bis(dipyrrinate)s

    NASA Astrophysics Data System (ADS)

    Ksenofontov, Alexander A.; Guseva, Galina B.; Antina, Elena V.

    2016-10-01

    Density functional theory (DFT) and Time-dependent density functional theory (TD- DFT) computations have been used to reveal structural, molecular, electronic and spectral-luminescent parameters and features of several homoleptic transition metals bis(dipyrrine) complexes. The influence of complexing agent and ligand nature on the regularities in geometric, spectral-luminescent properties, kinetic and thermal stability changes in the [M2L2] complexes series were studied. Special attention is paid to the influence of the solvating media (PCM/TD-B3LYP/Def2-SVP) on changing spectral-luminescent properties of d-metals bis(dipyrrinate)s. The interpretation of the dependence between spectral-luminescent properties of the complexes and HOMO-LUMO (highest occupied molecular orbital and lowest unoccupied molecular orbital) energy gap's width was given. It was shown that the regularities in changing the helicates' quantum yield depending on the nature of complexing agent, ligand and solvent properties, obtained from quantum-chemical calculations, are in the agreement with our previously obtained experimental data. Thus, structural and spectral-luminescent characteristics of new [M2L2] luminophors can be evaluated with high reliability, and good forecast prospects for their use as fluorescent dyes for optical devices can be made in terms of the results of theoretical studies (B3LYP/Def2-SVP and TD-B3LYP/Def2-SVP).

  18. Enhancing the estimation of blood pressure using pulse arrival time and two confounding factors.

    PubMed

    Baek, Hyun Jae; Kim, Ko Keun; Kim, Jung Soo; Lee, Boreom; Park, Kwang Suk

    2010-02-01

    A new method of blood pressure (BP) estimation using multiple regression with pulse arrival time (PAT) and two confounding factors was evaluated in clinical and unconstrained monitoring situations. For the first analysis with clinical data, electrocardiogram (ECG), photoplethysmogram (PPG) and invasive BP signals were obtained by a conventional patient monitoring device during surgery. In the second analysis, ECG, PPG and non-invasive BP were measured using systems developed to obtain data under conditions in which the subject was not constrained. To enhance the performance of BP estimation methods, heart rate (HR) and arterial stiffness were considered as confounding factors in regression analysis. The PAT and HR were easily extracted from ECG and PPG signals. For arterial stiffness, the duration from the maximum derivative point to the maximum of the dicrotic notch in the PPG signal, a parameter called TDB, was employed. In two experiments that normally cause BP variation, the correlation between measured BP and the estimated BP was investigated. Multiple-regression analysis with the two confounding factors improved correlation coefficients for diastolic blood pressure and systolic blood pressure to acceptable confidence levels, compared to existing methods that consider PAT only. In addition, reproducibility for the proposed method was determined using constructed test sets. Our results demonstrate that non-invasive, non-intrusive BP estimation can be obtained using methods that can be applied in both clinical and daily healthcare situations.

  19. Immunogenicity and protective efficacy of DMT liposome-adjuvanted tuberculosis subunit CTT3H vaccine

    PubMed Central

    Teng, Xindong; Tian, Maopeng; Li, Jianrong; Tan, Songwei; Yuan, Xuefeng; Yu, Qi; Jing, Yukai; Zhang, Zhiping; Yue, Tingting; Zhou, Lei; Fan, Xionglin

    2015-01-01

    Different strategies have been proposed for the development of protein subunit vaccine candidates for tuberculosis (TB), which shows better safety than other types of candidates and the currently used Bacillus Calmette-Guérin (BCG) vaccine. In order to develop more effective protein subunits depending on the mechanism of cell-mediated immunity against TB, a polyprotein CTT3H, based on 5 immunodominant antigens (CFP10, TB10.4, TB8.4, Rv3615c, and HBHA) with CD8+ epitopes of Mycobacterium tuberculosis, was constructed in this study. We vaccinated C57BL/6 mice with a TB subunit CTT3H protein in an adjuvant of dimethyldioctadecylammonium/monophosphoryl lipid A/trehalose 6,6′-dibehenate (DDA/MPL/TDB, DMT) liposome to investigate the immunogenicity and protective efficacy of this novel vaccine. Our results demonstrated that DMT liposome-adjuvanted CTT3H vaccine not only induced an antigen-specific CD4+ Th1 response, but also raised the number of PPD- and CTT3H-specific IFN-γ+ CD8+ T cells and elicited strong CTL responses against TB10.4, which provided more effective protection against a 60 CFU M. tuberculosis aerosol challenge than PBS control and DMT adjuvant alone. Our findings indicate that DMT-liposome is an effective adjuvant to stimulate CD8+ T cell responses and the DMT-adjuvanted subunit CTT3H vaccine is a promising candidate for the next generation of TB vaccine. PMID:25905680

  20. Synthesis of biphenyl derivative and its application as dichroic materials in poly (vinyl alcohol) polarizing films

    NASA Astrophysics Data System (ADS)

    Shahab, Siyamak; Almodarresiyeh, Hora A.; Filippovich, Ljudmila; Kumar, Rakesh; Darroudi, Mahdieh; Hajikolaee, Fatemeh Haji

    2016-03-01

    In the present work, first time on the basis of polyvinyl alcohol (PVA) and new designed structure (Potassium 2,2‧-([1,1‧-biphenyl]-4,4‧-diylbis(azanediyl))diacetate) (I) thermostable polarizing film was created. The structure (I) was first modeled and then synthesized and obtained polarizing film absorbing at λmax = 300 nm used for electronic applications. Polarizing efficiency (PE) of polarizing film is 96% at stretching degree (Rs) 4.0. On the basis of PVA, Potassium 2,2‧-([1,1‧-biphenyl]-4,4‧-diylbis(azanediyl))diacetate (I), Sodium 2-hydroxy-5-((2-methoxy-4-((4-sulfonatophenyl)diazenyl)phenyl)diazenyl)benzoate (II) and commercial dye (Congo Red) thermostable polarizing film for wide spectral range of spectrum (λmax = 288-561 nm) was developed. During the work it was established that oriented PVA-films is phenomenon of anisotropy of thermal conductivity (λ||/λ⊥). It is very important for creation of thermostable polarizing films. Thermal conductivity in a direction of orientation (λ||) is higher than in a direction perpendicular orientations (λ⊥). The optimization of the molecule (1) was carried out by Density Functional Theory (DFT) using B3LYP/6-311 + G* method. Electronic absorption spectrum of the molecule (I) in dimethylformamide (DMF) solution was calculated using TDB3LYP/6-311 + G* level. The nature of absorption bands in the UV spectral region was interpreted.

  1. Possible detection of a bimodal cloud distribution in the atmosphere of HAT-P-32 A b from multiband photometry

    NASA Astrophysics Data System (ADS)

    Tregloan-Reed, J.; Southworth, J.; Mancini, L.; Mollière, P.; Ciceri, S.; Bruni, I.; Ricci, D.; Ayala-Loera, C.; Henning, T.

    2018-03-01

    We present high-precision photometry of eight separate transit events in the HAT-P-32 planetary system. One transit event was observed simultaneously by two telescopes of which one obtained a simultaneous multiband light curve in three optical bands, giving a total of 11 transit light curves. Due to the filter selection and in conjunction with using the defocused photometry technique, we were able to obtain an extremely high-precision, ground-based transit in the u band (350 nm), with an rms scatter of ≈1 mmag. All 11 transits were modelled using PRISM and GEMC, and the physical properties of the system calculated. We find the mass and radius of the host star to be 1.182 ± 0.041 M⊙ and 1.225 ± 0.015 R⊙, respectively. For the planet, we find a mass of 0.80 ± 0.14 MJup, a radius of 1.807 ± 0.022 RJup, and a density of 0.126 ± 0.023 ρJup. These values are consistent with those found in the literature. We also obtain a new orbital ephemeris for the system T0 = BJD/TDB 2 454 420.447187(96) + 2.15000800(10) × E. We measured the transmission spectrum of HAT-P-32 A b and compared it to theoretical transmission spectra. Our results indicate a bimodal cloud particle distribution consisting of Rayleigh-like haze and grey absorbing cloud particles within the atmosphere of HAT-P-32 A b.

  2. Short-time dynamics of 2-thiouracil in the light absorbing S{sub 2}(ππ{sup ∗}) state

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, Jie; Zhang, Teng-shuo; Xue, Jia-dan

    2015-11-07

    Ultrahigh quantum yields of intersystem crossing to the lowest triplet state T{sub 1} are observed for 2-thiouracils (2TU), which is in contrast to the natural uracils that predominantly exhibit ultrafast internal conversion to the ground state upon excitation to the singlet excited state. The intersystem crossing mechanism of 2TU has recently been investigated using second-order perturbation methods with a high-level complete-active space self-consistent field. Three competitive nonadiabatic pathways to the lowest triplet state T{sub 1} from the initially populated singlet excited state S{sub 2} were proposed. We investigate the initial decay dynamics of 2TU from the light absorbing excited statesmore » using resonance Raman spectroscopy, time-dependent wave-packet theory in the simple model, and complete-active space self-consistent field (CASSCF) and time dependent-Becke’s three-parameter exchange and correlation functional with the Lee-Yang-Parr correlation functional (TD-B3LYP) calculations. The obtained short-time structural dynamics in easy-to-visualize internal coordinates were compared with the CASSCF(16,11) predicted key nonadiabatic decay routes. Our results indicate that the predominant decay pathway initiated at the Franck-Condon region is toward the S{sub 2}/S{sub 1} conical intersection point and S{sub 2}T{sub 3} intersystem crossing point, but not toward the S{sub 2}T{sub 2} intersystem crossing point.« less

  3. Ultrafast excited-state deactivation of 9-methylhypoxanthine in aqueous solution: A QM/MM MD study.

    PubMed

    Guo, Xugeng; Yuan, Huijuan; An, Beibei; Zhu, Qiuling; Zhang, Jinglai

    2016-04-21

    Photoinduced ultrafast non-adiabatic decay of 9-methylhypoxanthine (9MHPX) in aqueous solution was investigated by ab initio surface-hopping dynamics calculations using a combined quantum mechanical/molecular mechanical approach. The absorption spectra of 9MHPX in aqueous solution were also explored by the hybrid cluster-continuum model at the level of time-dependent density functional theory along with the polarizable continuum model (PCM). The static electronic-structure calculations indicate that the absorption spectra of 9MHPX simulated by TD-B3LYP/PCM and TD-X3LYP/PCM can reproduce very well the experimental findings, with the accuracy of about 0.20 eV. According to dynamics simulations, irradiation of 9MHPX populates the bright excited singlet S1 state, which may undergo an ultrafast non-radiative deactivation to the S0 state. The lifetime of the S1 state of 9MHPX in aqueous solution is predicted to be 115.6 fs, slightly longer than that in the gas phase (88.8 fs), suggesting that the solventwater has no significant influence on the excited-state lifetime of 9MHPX. Such a behavior in 9MHPX is distinctly different from its parent hypoxanthine keto-N9H tautomer in which the excited-state lifetime of the latter in watersolution was remarkably enhanced as compared to the gas phase. The significant difference of the photodynamical behaviors between 9MHPX and keto-N9H can be ascribed to their different hydrogen bond environment in aqueous solution.

  4. Immunogenicity and protective efficacy of DMT liposome-adjuvanted tuberculosis subunit CTT3H vaccine.

    PubMed

    Teng, Xindong; Tian, Maopeng; Li, Jianrong; Tan, Songwei; Yuan, Xuefeng; Yu, Qi; Jing, Yukai; Zhang, Zhiping; Yue, Tingting; Zhou, Lei; Fan, Xionglin

    2015-01-01

    Different strategies have been proposed for the development of protein subunit vaccine candidates for tuberculosis (TB), which shows better safety than other types of candidates and the currently used Bacillus Calmette-Guérin (BCG) vaccine. In order to develop more effective protein subunits depending on the mechanism of cell-mediated immunity against TB, a polyprotein CTT3H, based on 5 immunodominant antigens (CFP10, TB10.4, TB8.4, Rv3615c, and HBHA) with CD8(+) epitopes of Mycobacterium tuberculosis, was constructed in this study. We vaccinated C57BL/6 mice with a TB subunit CTT3H protein in an adjuvant of dimethyldioctadecylammonium/monophosphoryl lipid A/trehalose 6,6'-dibehenate (DDA/MPL/TDB, DMT) liposome to investigate the immunogenicity and protective efficacy of this novel vaccine. Our results demonstrated that DMT liposome-adjuvanted CTT3H vaccine not only induced an antigen-specific CD4(+) Th1 response, but also raised the number of PPD- and CTT3H-specific IFN-γ(+) CD8(+) T cells and elicited strong CTL responses against TB10.4, which provided more effective protection against a 60 CFU M. tuberculosis aerosol challenge than PBS control and DMT adjuvant alone. Our findings indicate that DMT-liposome is an effective adjuvant to stimulate CD8(+) T cell responses and the DMT-adjuvanted subunit CTT3H vaccine is a promising candidate for the next generation of TB vaccine.

  5. Ultrafast excited-state deactivation of 9-methylhypoxanthine in aqueous solution: A QM/MM MD study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guo, Xugeng, E-mail: xgguo@henu.edu.cn, E-mail: zhangjinglai@henu.edu.cn; Yuan, Huijuan; An, Beibei

    Photoinduced ultrafast non-adiabatic decay of 9-methylhypoxanthine (9MHPX) in aqueous solution was investigated by ab initio surface-hopping dynamics calculations using a combined quantum mechanical/molecular mechanical approach. The absorption spectra of 9MHPX in aqueous solution were also explored by the hybrid cluster-continuum model at the level of time-dependent density functional theory along with the polarizable continuum model (PCM). The static electronic-structure calculations indicate that the absorption spectra of 9MHPX simulated by TD-B3LYP/PCM and TD-X3LYP/PCM can reproduce very well the experimental findings, with the accuracy of about 0.20 eV. According to dynamics simulations, irradiation of 9MHPX populates the bright excited singlet S{sub 1}more » state, which may undergo an ultrafast non-radiative deactivation to the S{sub 0} state. The lifetime of the S{sub 1} state of 9MHPX in aqueous solution is predicted to be 115.6 fs, slightly longer than that in the gas phase (88.8 fs), suggesting that the solvent water has no significant influence on the excited-state lifetime of 9MHPX. Such a behavior in 9MHPX is distinctly different from its parent hypoxanthine keto-N9H tautomer in which the excited-state lifetime of the latter in water solution was remarkably enhanced as compared to the gas phase. The significant difference of the photodynamical behaviors between 9MHPX and keto-N9H can be ascribed to their different hydrogen bond environment in aqueous solution.« less

  6. INPOP:evolution, applications and perspectives

    NASA Astrophysics Data System (ADS)

    Laskar, Jacques; Fienga, Agnes; Manche, Hervé; Verma, Ashok; Gastineau, Mickael

    2012-08-01

    The INPOP ephemerides have known several improvement since the last INPOP10a release (Fienga et al. 2011a) . Improvement in the asteroid masse determinations have been implemented in using a priori sigmas and bound values least squares. Estimations of 120 asteroid masses have then been obtained with INPOP10b and presented in (Fieng a et al. 2012a). TDB and TCB versions of this ephemerides have been distributed through the INPOP website as well as spice format versions. Studies about solar corona have also been investigated leading to new electron density modeling presented in (Verma et al. 2012b). Adjustments of the Moon libration and orbits are also continuously operated. Perspectives will also be drawn during this talk, especially related to the analys is of spacecraft data (Messenger) for the planetary orbits and to the combination of spacecraft and LLR data for the Moon orbit and libration. A. Fienga, J. Laskar, P. Kuchynka, H. Manche, G. Desvignes, M. Gastineau, I. Cognard, and G. Theureau, 2011a, “The INPOP10a planetary ephemeris and its applications in fundamental physics,” Celes tial Mechanics and Dynamical Astronomy, vol. 111, pp. 363 - 385. A. Fienga, P. Kuchynka, J. Laskar, H. Manche, and M. Gastineau, 2012a “Asteroid mass determinations with INPOP planetary ephemerides,” in EPSC - DPS Joint Meeting 2011, p. 1879. A. K. Verma and A . Fienga, 2012b “Re - Estimation of Solar Corona Coefficients (a, B, c) by Using MGS Mex Spacecraft Datas,” in EPSC - DPS Joint Meeting 2011, p. 1828.

  7. FTIR, FT-Raman, UV-Visible spectra and quantum chemical calculations of allantoin molecule and its hydrogen bonded dimers.

    PubMed

    Alam, Mohammad Jane; Ahmad, Shabbir

    2015-02-05

    FTIR, FT-Raman and electronic spectra of allantoin molecule are recorded and investigated using DFT and MP2 methods with 6-311++G(d,p) basis set. The molecular structure, anharmonic vibrational spectra, natural atomic charges, non-linear optical properties, etc. have been computed for the ground state of allantoin. The anharmonic vibrational frequencies are calculated using PT2 algorithm (Barone method) as well as VSCF and CC-VSCF methods. These methods yield results that are in remarkable agreement with the experiment. The coupling strengths between pairs of modes are also calculated using coupling integral based on 2MR-QFF approximation. The simulations on allantoin dimers have been also performed at B3LYP/6-311++G(d,p) level of theory to investigate the effect of the intermolecular interactions on the molecular structure and vibrational frequencies of the monomer. Vibrational assignments are made with the great accuracy using PED calculations and animated modes. The combination and overtone bands have been also identified in the FTIR spectrum with the help of anharmonic computations. The electronic spectra are simulated in gas and solution at TD-B3LYP/6-311++G(d,p) level of theory. The important global quantities such as electro-negativity, electronic chemical potential, electrophilicity index, chemical hardness and softness based on HOMO, LUMO energy eigenvalues are also computed. NBO analysis has been performed for monomer and dimers of allantoin at B3LYP/6-311++G(d,p) level of theory. Copyright © 2014 Elsevier B.V. All rights reserved.

  8. RNA-sequencing-based transcriptome and biochemical analyses of steroidal saponin pathway in a complete set of Allium fistulosum—A. cepa monosomic addition lines

    PubMed Central

    Abdelrahman, Mostafa; El-Sayed, Magdi; Sato, Shusei; Hirakawa, Hideki; Ito, Shin-ichi; Tanaka, Keisuke; Mine, Yoko; Sugiyama, Nobuo; Suzuki, Minoru; Yamauchi, Naoki

    2017-01-01

    The genus Allium is a rich source of steroidal saponins, and its medicinal properties have been attributed to these bioactive compounds. The saponin compounds with diverse structures play a pivotal role in Allium’s defense mechanism. Despite numerous studies on the occurrence and chemical structure of steroidal saponins, their biosynthetic pathway in Allium species is poorly understood. The monosomic addition lines (MALs) of the Japanese bunching onion (A. fistulosum, FF) with an extra chromosome from the shallot (A. cepa Aggregatum group, AA) are powerful genetic resources that enable us to understand many physiological traits of Allium. In the present study, we were able to isolate and identify Alliospiroside A saponin compound in A. fistulosum with extra chromosome 2A from shallot (FF2A) and its role in the defense mechanism against Fusarium pathogens. Furthermore, to gain molecular insight into the Allium saponin biosynthesis pathway, high-throughput RNA-Seq of the root, bulb, and leaf of AA, MALs, and FF was carried out using Illumina's HiSeq 2500 platform. An open access Allium Transcript Database (Allium TDB, http://alliumtdb.kazusa.or.jp) was generated based on RNA-Seq data. The resulting assembled transcripts were functionally annotated, revealing 50 unigenes involved in saponin biosynthesis. Differential gene expression (DGE) analyses of AA and MALs as compared with FF (as a control) revealed a strong up-regulation of the saponin downstream pathway, including cytochrome P450, glycosyltransferase, and beta-glucosidase in chromosome 2A. An understanding of the saponin compounds and biosynthesis-related genes would facilitate the development of plants with unique saponin content and, subsequently, improved disease resistance. PMID:28800607

  9. RNA-sequencing-based transcriptome and biochemical analyses of steroidal saponin pathway in a complete set of Allium fistulosum-A. cepa monosomic addition lines.

    PubMed

    Abdelrahman, Mostafa; El-Sayed, Magdi; Sato, Shusei; Hirakawa, Hideki; Ito, Shin-Ichi; Tanaka, Keisuke; Mine, Yoko; Sugiyama, Nobuo; Suzuki, Yutaka; Yamauchi, Naoki; Shigyo, Masayoshi

    2017-01-01

    The genus Allium is a rich source of steroidal saponins, and its medicinal properties have been attributed to these bioactive compounds. The saponin compounds with diverse structures play a pivotal role in Allium's defense mechanism. Despite numerous studies on the occurrence and chemical structure of steroidal saponins, their biosynthetic pathway in Allium species is poorly understood. The monosomic addition lines (MALs) of the Japanese bunching onion (A. fistulosum, FF) with an extra chromosome from the shallot (A. cepa Aggregatum group, AA) are powerful genetic resources that enable us to understand many physiological traits of Allium. In the present study, we were able to isolate and identify Alliospiroside A saponin compound in A. fistulosum with extra chromosome 2A from shallot (FF2A) and its role in the defense mechanism against Fusarium pathogens. Furthermore, to gain molecular insight into the Allium saponin biosynthesis pathway, high-throughput RNA-Seq of the root, bulb, and leaf of AA, MALs, and FF was carried out using Illumina's HiSeq 2500 platform. An open access Allium Transcript Database (Allium TDB, http://alliumtdb.kazusa.or.jp) was generated based on RNA-Seq data. The resulting assembled transcripts were functionally annotated, revealing 50 unigenes involved in saponin biosynthesis. Differential gene expression (DGE) analyses of AA and MALs as compared with FF (as a control) revealed a strong up-regulation of the saponin downstream pathway, including cytochrome P450, glycosyltransferase, and beta-glucosidase in chromosome 2A. An understanding of the saponin compounds and biosynthesis-related genes would facilitate the development of plants with unique saponin content and, subsequently, improved disease resistance.

  10. Designing CAF-adjuvanted dry powder vaccines: spray drying preserves the adjuvant activity of CAF01.

    PubMed

    Ingvarsson, Pall Thor; Schmidt, Signe Tandrup; Christensen, Dennis; Larsen, Niels Bent; Hinrichs, Wouter Leonardus Joseph; Andersen, Peter; Rantanen, Jukka; Nielsen, Hanne Mørck; Yang, Mingshi; Foged, Camilla

    2013-05-10

    Dry powder vaccine formulations are highly attractive due to improved storage stability and the possibility for particle engineering, as compared to liquid formulations. However, a prerequisite for formulating vaccines into dry formulations is that their physicochemical and adjuvant properties remain unchanged upon rehydration. Thus, we have identified and optimized the parameters of importance for the design of a spray dried powder formulation of the cationic liposomal adjuvant formulation 01 (CAF01) composed of dimethyldioctadecylammonium (DDA) bromide and trehalose 6,6'-dibehenate (TDB) via spray drying. The optimal excipient to stabilize CAF01 during spray drying and for the design of nanocomposite microparticles was identified among mannitol, lactose and trehalose. Trehalose and lactose were promising stabilizers with respect to preserving liposome size, as compared to mannitol. Trehalose and lactose were in the glassy state upon co-spray drying with the liposomes, whereas mannitol appeared crystalline, suggesting that the ability of the stabilizer to form a glassy matrix around the liposomes is one of the prerequisites for stabilization. Systematic studies on the effect of process parameters suggested that a fast drying rate is essential to avoid phase separation and lipid accumulation at the surface of the microparticles during spray drying. Finally, immunization studies in mice with CAF01 in combination with the tuberculosis antigen Ag85B-ESAT6-Rv2660c (H56) demonstrated that spray drying of CAF01 with trehalose under optimal processing conditions resulted in the preservation of the adjuvant activity in vivo. These data demonstrate the importance of liposome stabilization via optimization of formulation and processing conditions in the engineering of dry powder liposome formulations. Copyright © 2013 Elsevier B.V. All rights reserved.

  11. Temporal and spatial variations of precipitation in Northwest China during 1960-2013

    NASA Astrophysics Data System (ADS)

    Yang, Peng; Xia, Jun; Zhang, Yongyong; Hong, Si

    2017-01-01

    Based on the precipitation data from 96 weather stations in Northwest China (NWC) during 1960-2013, the Continuous Wavelet Transform (CWT) and the Mann-Kendall (MK) test were applied to analyze the precipitation spatiotemporal variations at different time scales. The relationships between the original precipitation and different periodic components were investigated. The results indicated that the annual precipitation was significantly increasing (P < 0.01) at the rate of 0.55 mm/a in the NWC. In terms of seasonal precipitation, the summer original precipitation significantly increased (P < 0.05) in the Southern Altay Mountain Basin (SAMB), Qaidam Basin (QB), Qiang Tang Plateau Basin (QTPB), Turpan-Hami Basin (THB), Tarim Desert Basin (TDB), Northern Tianshan Mountain Basin (NTMB) and NWC. For the winter original precipitation, except the Inner Mongolia Inland Rivers Basin and Northern Kunlun Mountain Basin, the significant increases (P < 0.05) were detected in the other sub-basins. In terms of monthly precipitation, significant increases were detected in January in the SAMB, NTMB and NWC, and July in the QB, Headstreams of Tarim River Basin (HTRB) and N. Additionally, most of the increasing and decreasing trends began in the mid-1980s or mid-1990s. Moreover, the periodic components were not always similar to the original data with the significant trends. The dominant scale of the original data from the periodic components was different in spatiotemporal distribution. Meanwhile, the relationship between the precipitation and El Niño-Southern Oscillation (ENSO) was different from period to period and from time scale to time scale. This study will help to develop better management measures to account for climate change and the supply/demand of water.

  12. Soft rot erwiniae: from genes to genomes.

    PubMed

    Toth, Ian K; Bell, Kenneth S; Holeva, Maria C; Birch, Paul R J

    2003-01-01

    more with Eca and Ech than with Ecc. http://www.scri.sari.ac.uk/TiPP/Erwinia.htm, http://www.ahabs.wisc.edu:16080/ approximately pernalab/erwinia/index.htm, http://www.tigr.org/tdb/mdb/mdbinprogress.html, http://www.sanger.ac.uk/Projects/E_carotovora/.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siverd, Robert J.; Pepper, Joshua; Stassun, Keivan G.

    We present the discovery of KELT-1b, the first transiting low-mass companion from the wide-field Kilodegree Extremely Little Telescope-North (KELT-North) transit survey. A joint analysis of the spectroscopic, radial velocity, and photometric data indicates that the V = 10.7 primary is a mildly evolved mid-F star with T{sub eff} = 6516 {+-} 49 K, log g 4.228{sup +0.014}{sub -0.021}, and [Fe/H] = 0.052 {+-} 0.079, with an inferred mass M{sub *} = 1.335 {+-} 0.063 M{sub Sun} and radius R{sub *} 1.471{sup +0.045}{sub -0.035} R{sub Sun }. The companion is a low-mass brown dwarf or a super-massive planet with mass M{submore » P} = 27.38 {+-} 0.93 M{sub Jup} and radius R{sub P} = 1.116{sup +0.038}{sub -0.029} R{sub Jup}. The companion is on a very short ({approx}29 hr) period circular orbit, with an ephemeris T{sub c} (BJD{sub TDB}) = 2455909.29280 {+-} 0.00023 and P = 1.217501 {+-} 0.000018 days. KELT-1b receives a large amount of stellar insolation, resulting in an estimated equilibrium temperature assuming zero albedo and perfect redistribution of T{sub eq} = 2423{sup +34}{sub -27} K. Comparison with standard evolutionary models suggests that the radius of KELT-1b is likely to be significantly inflated. Adaptive optics imaging reveals a candidate stellar companion to KELT-1 with a separation of 588 {+-} 1 mas, which is consistent with an M dwarf if it is at the same distance as the primary. Rossiter-McLaughlin measurements during transit imply a projected spin-orbit alignment angle {lambda} = 2 {+-} 16 deg, consistent with a zero obliquity for KELT-1. Finally, the vsin I{sub *} = 56 {+-} 2 km s{sup -1} of the primary is consistent at {approx}2{sigma} with tidal synchronization. Given the extreme parameters of the KELT-1 system, we expect it to provide an important testbed for theories of the emplacement and evolution of short-period companions, as well as theories of tidal dissipation and irradiated brown dwarf atmospheres.« less

  14. Coordination-Directed Stacking and Aggregation-Induced Emission Enhancement of the Zn(II) Schiff Base Complex.

    PubMed

    Wang, Dan; Li, Shu-Mu; Zheng, Jian-Quan; Kong, Duan-Yang; Zheng, Xiang-Jun; Fang, De-Cai; Jin, Lin-Pei

    2017-01-17

    2-(Trityliminomethyl)-quinolin-8-ol (HL) and its Zn(II) complex were synthesized and characterized by single-crystal X-ray diffraction. HL is an unsymmetrical molecule and coordinated with Zn(II) ion to form ZnL 2 in the antiparallel-mode arrangement via Zn-O (hydroxyl group) and Zn-N (quinoline ring) of HL. A high degree of ZnL 2 molecules ordering stacking is formed by the coordination bonds and intermolecular π-π interactions, in which head-to-tail arrangement (J-mode stacking) for L - is found. HL is nonfluorescent and ZnL 2 is weakly fluorescent in THF. The fluorescence emission of ZnL 2 enhances in THF/H 2 O as H 2 O% (volume %) is above 60% and aggregates particles with several hundred nanometers are formed, which is confirmed by DLS data and TEM images. The J-aggregates stacking for L - in ZnL 2 results in aggregation-induced emission enhancement (AIEE) for ZnL 2 in THF/H 2 O. Theoretical computations based on B3LYP/6-31G(d, p) and TD-B3LYP/6-31G(d, p) methods were carried out. ESIPT is the supposed mechanism for fluorescent silence of HL, and fluorescence emission of ZnL 2 is attributed to the restriction of ESIPT process. The oscillator strength of ZnL 2 increases from 0.017 for monomer to 0.032 for trimer. It indicates that a high degree of ZnL 2 molecules ordering stacking in THF/H 2 O is of benefit to fluorescence enhancement. HL is an ESIPT-coupled AIEE chemosensor for Zn(II) with high selectivity and sensitivity in aqueous medium. HL can efficiently detect intracellular Zn(II) ions because of ESIPT-coupled AIEE property of ZnL 2 in mixed solvent.

  15. Diallel Analysis and Growth Parameters as Selection Tools for Drought Tolerance in Young Theobroma cacao Plants

    PubMed Central

    dos Santos, Emerson Alves; de Almeida, Alex-Alan Furtado; Ahnert, Dario; Branco, Marcia Christina da Silva; Valle, Raúl René; Baligar, Virupax C.

    2016-01-01

    This study aimed to estimate the combining ability, of T. cacao genotypes preselected for drought tolerance through diallel crosses. The experiment was conducted under greenhouse conditions at the Cacao Research Center (CEPEC), Ilhéus, Bahia, Brazil, in a completely randomized block design, in an experimental arrangement 21 x 2 [21 complete diallel crosses and two water regimes (control and stressed)]. In the control, soil moisture was kept close to field capacity, with predawn leaf water potential (ΨWL) ranging from -0.1 to -0.5 MPa. In the drought regime, the soil moisture was reduced gradually by decreasing the amount of water application until ΨWL reached -2.0 to -2.5 MPa. Significant differences (p < 0.05) were observed for most morphological attributes analyzed regarding progenies, water regime and their interactions. The results of the joint diallel analysis revealed significant effects between general combining ability (GCA) x water regimes and between specific combining ability (SCA) x water regimes. The SCA 6 genetic material showed high general combining ability for growth variables regardless of the water regime. In general, the water deficit influenced the production of biomass in most of the evaluated T. cacao crosses, except for SCA-6 x IMC-67, Catongo x SCA, MOC-01 x Catongo, Catongo x IMC-67 and RB-40 x Catongo. Multivariate analysis showed that stem diameter (CD), total leaf area (TLA), leaf dry biomass (LDB), stem dry biomass (SDB), root dry biomass (RDB), total dry biomass (TDB), root length (RL), root volume (RV), root diameter (RD) <1 mm and 1 <(RD) <2 mm were the most important growth parameters in the separation of T. cacao genotypes in to tolerant and intolerant to soil water deficit. PMID:27504627

  16. Diallel Analysis and Growth Parameters as Selection Tools for Drought Tolerance in Young Theobroma cacao Plants.

    PubMed

    Dos Santos, Emerson Alves; Almeida, Alex-Alan Furtado de; Ahnert, Dario; Branco, Marcia Christina da Silva; Valle, Raúl René; Baligar, Virupax C

    2016-01-01

    This study aimed to estimate the combining ability, of T. cacao genotypes preselected for drought tolerance through diallel crosses. The experiment was conducted under greenhouse conditions at the Cacao Research Center (CEPEC), Ilhéus, Bahia, Brazil, in a completely randomized block design, in an experimental arrangement 21 x 2 [21 complete diallel crosses and two water regimes (control and stressed)]. In the control, soil moisture was kept close to field capacity, with predawn leaf water potential (ΨWL) ranging from -0.1 to -0.5 MPa. In the drought regime, the soil moisture was reduced gradually by decreasing the amount of water application until ΨWL reached -2.0 to -2.5 MPa. Significant differences (p < 0.05) were observed for most morphological attributes analyzed regarding progenies, water regime and their interactions. The results of the joint diallel analysis revealed significant effects between general combining ability (GCA) x water regimes and between specific combining ability (SCA) x water regimes. The SCA 6 genetic material showed high general combining ability for growth variables regardless of the water regime. In general, the water deficit influenced the production of biomass in most of the evaluated T. cacao crosses, except for SCA-6 x IMC-67, Catongo x SCA, MOC-01 x Catongo, Catongo x IMC-67 and RB-40 x Catongo. Multivariate analysis showed that stem diameter (CD), total leaf area (TLA), leaf dry biomass (LDB), stem dry biomass (SDB), root dry biomass (RDB), total dry biomass (TDB), root length (RL), root volume (RV), root diameter (RD) <1 mm and 1 <(RD) <2 mm were the most important growth parameters in the separation of T. cacao genotypes in to tolerant and intolerant to soil water deficit.

  17. MeT-DB V2.0: elucidating context-specific functions of N6-methyl-adenosine methyltranscriptome

    PubMed Central

    Liu, Hui; Wang, Huaizhi; Wei, Zhen; Zhang, Songyao; Hua, Gang; Zhang, Shao-Wu; Zhang, Lin; Gao, Shou-Jiang

    2018-01-01

    Abstract Methyltranscriptome is an exciting new area that studies the mechanisms and functions of methylation in transcripts. A knowledge base with the systematic collection and curation of context specific transcriptome-wide methylations is critical for elucidating their biological functions as well as for developing bioinformatics tools. Since its inception in 2014, the Met-DB (Liu, H., Flores, M.A., Meng, J., Zhang, L., Zhao, X., Rao, M.K., Chen, Y. and Huang, Y. (2015) MeT-DB: a database of transcriptome methylation in mammalian cells. Nucleic Acids Res., 43, D197–D203), has become an important resource for methyltranscriptome, especially in the N6-methyl-adenosine (m6A) research community. Here, we report Met-DB v2.0, the significantly improved second version of Met-DB, which is entirely redesigned to focus more on elucidating context-specific m6A functions. Met-DB v2.0 has a major increase in context-specific m6A peaks and single-base sites predicted from 185 samples for 7 species from 26 independent studies. Moreover, it is also integrated with a new database for targets of m6A readers, erasers and writers and expanded with more collections of functional data. The redesigned Met-DB v2.0 web interface and genome browser provide more friendly, powerful, and informative ways to query and visualize the data. More importantly, MeT-DB v2.0 offers for the first time a series of tools specifically designed for understanding m6A functions. Met-DB V2.0 will be a valuable resource for m6A methyltranscriptome research. The Met-DB V2.0 database is available at http://compgenomics.utsa.edu/MeTDB/ and http://www.xjtlu.edu.cn/metdb2. PMID:29126312

  18. KELT-20b: A Giant Planet with a Period of P ˜ 3.5 days Transiting the V ˜ 7.6 Early A Star HD 185603

    NASA Astrophysics Data System (ADS)

    Lund, Michael B.; Rodriguez, Joseph E.; Zhou, George; Gaudi, B. Scott; Stassun, Keivan G.; Johnson, Marshall C.; Bieryla, Allyson; Oelkers, Ryan J.; Stevens, Daniel J.; Collins, Karen A.; Penev, Kaloyan; Quinn, Samuel N.; Latham, David W.; Villanueva, Steven, Jr.; Eastman, Jason D.; Kielkopf, John F.; Oberst, Thomas E.; Jensen, Eric L. N.; Cohen, David H.; Joner, Michael D.; Stephens, Denise C.; Relles, Howard; Corfini, Giorgio; Gregorio, Joao; Zambelli, Roberto; Esquerdo, Gilbert A.; Calkins, Michael L.; Berlind, Perry; Ciardi, David R.; Dressing, Courtney; Patel, Rahul; Gagnon, Patrick; Gonzales, Erica; Beatty, Thomas G.; Siverd, Robert J.; Labadie-Bartz, Jonathan; Kuhn, Rudolf B.; Colón, Knicole D.; James, David; Pepper, Joshua; Fulton, Benjamin J.; McLeod, Kim K.; Stockdale, Christopher; Calchi Novati, Sebastiano; DePoy, D. L.; Gould, Andrew; Marshall, Jennifer L.; Trueblood, Mark; Trueblood, Patricia; Johnson, John A.; Wright, Jason; McCrady, Nate; Wittenmyer, Robert A.; Johnson, Samson A.; Sergi, Anthony; Wilson, Maurice; Sliski, David H.

    2017-11-01

    We report the discovery of KELT-20b, a hot Jupiter transiting a V˜ 7.6 early A star, HD 185603, with an orbital period of P≃ 3.47 days. Archival and follow-up photometry, Gaia parallax, radial velocities, Doppler tomography, and AO imaging were used to confirm the planetary nature of KELT-20b and characterize the system. From global modeling we infer that KELT-20 is a rapidly rotating (v\\sin {I}* ≃ 120 {km} {{{s}}}-1) A2V star with an effective temperature of {T}{eff}={8730}-260+250 K, mass of {M}* ={1.76}-0.20+0.14 {M}⊙ , radius of {R}* ={1.561}-0.064+0.058 {R}⊙ , surface gravity of {log}{g}* ={4.292}-0.020+0.017, and age of ≲ 600 {Myr}. The planetary companion has a radius of {R}P={1.735}-0.075+0.070 {R}{{J}}, a semimajor axis of a={0.0542}-0.0021+0.0014 au, and a linear ephemeris of {{BJD}}{TDB}=2457503.120049+/- 0.000190 +E(3.4741070+/- 0.0000019). We place a 3σ upper limit of ˜ 3.5 {M}{{J}} on the mass of the planet. Doppler tomographic measurements indicate that the planetary orbit normal is well aligned with the projected spin axis of the star (λ =3\\buildrel{\\circ}\\over{.} 4+/- 2\\buildrel{\\circ}\\over{.} 1). The inclination of the star is constrained to 24\\buildrel{\\circ}\\over{.} 4< {I}* < 155\\buildrel{\\circ}\\over{.} 6, implying a three-dimensional spin-orbit alignment of 1\\buildrel{\\circ}\\over{.} 3< \\psi < 69\\buildrel{\\circ}\\over{.} 8. KELT-20b receives an insolation flux of ˜ 8× {10}9 {erg} {{{s}}}-1 {{cm}}-2, implying an equilibrium temperature of of ˜2250 K, assuming zero albedo and complete heat redistribution. Due to the high stellar {T}{eff}, KELT-20b also receives an ultraviolet (wavelength d≤slant 91.2 nm) insolation flux of ˜ 9.1× {10}4 {erg} {{{s}}}-1 {{cm}}-2, possibly indicating significant atmospheric ablation. Together with WASP-33, Kepler-13 A, HAT-P-57, KELT-17, and KELT-9, KELT-20 is the sixth A star host of a transiting giant planet, and the third-brightest host (in V) of a transiting planet.

  19. F29. HIGH-RISK SYMPTOMS FOR PSYCHOSIS IN ADOLESCENTS AND ITS RELATIONSHIP WITH FAMILY BURDEN

    PubMed Central

    Puig-Navarro, Olga; De la Serna, Elena; Tor, Jordina; Sintes, Anna; Sugranyes, Gisela; Redondo, Marina; Pardo, Marta; Dolz, Montse; Baeza, Inmaculada

    2018-01-01

    Abstract Background High-risk symptoms for psychosis (HRS) and substantial functional impairment occurs early in the course of psychosis (Fusar-Poli et al., 2015). Many patients with HRS are adolescents who are still living at home and are highly reliant on their relatives for support. Objectives: (1) To compare the family burden of caregivers of adolescents with HRS with carers of an age and gender matched healthy control group (HC), (2) to examine the relationships between different family burden aspects and high-risk symptoms for psychosis in the HRS sample. Methods Sample: 68 HRS subjects (15.3 ± 1.7 years, 66% females) and 42 HC subjects (15.5 ± 1.5 years, 66% females) from a prospective longitudinal study including help-seeking subjects who met HRS criteria (Child and Adolescent Psychiatry and Psychology departments of Hospital Clínic and Sant Joan de Déu, Barcelona, Spain). Inclusion criteria: age 10–17 years, meeting criteria for 1) attenuated positive or negative symptoms in the previous 12-months, 2) brief intermittent psychotic symptoms, 3) first or second degree relative with schizophrenia or schizotypical disorder plus impairment of functioning. Exclusion criteria: IQ<70, having a diagnosis of ASD. For HC subjects, exclusion criteria were having 1st or 2nd degree familiar with a psychotic disorder; a diagnosis of ASD and/or IQ<70. Instruments: the Semistructured Interview for Prodromal Syndromes and Scale of Prodromal Symptoms (SIPS/SOPS), the Hamilton Depression Scale and the Young Mania Scale for affective symptoms, a cognitive battery and the Caregiver Burden Inventory (CBI) which is a measure of family burden that has been validated in first-episode patients (McCleery et al., 2007). Caregivers’ responses are rated on a Likert scale from 0 (not at all descriptive) to 4 (very descriptive) and distributed in 5 factors: Time-Dependence Burden (T-Db), Developmental Burden (Db), Physical Burden (Pb), Social Burden (Sb), and Emotional Burden (Eb

  20. Density functional theory study of adsorption geometries and electronic structures of azo-dye-based molecules on anatase TiO2 surface for dye-sensitized solar cell applications.

    PubMed

    Prajongtat, Pongthep; Suramitr, Songwut; Nokbin, Somkiat; Nakajima, Koichi; Mitsuke, Koichiro; Hannongbua, Supa

    2017-09-01

    Structural and electronic properties of eight isolated azo dyes (ArNNAr', where Ar and Ar' denote the aryl groups containing benzene and naphthalene skeletons, respectively) were investigated by density functional theory (DFT) based on the B3LYP/6-31G(d,p) and TD-B3LYP/6-311G(d,p) methods The effect of methanol solvent on the structural and electronic properties of the azo dyes was elucidated by employing a polarizable continuum model (PCM). Then, the azo dyes adsorbed onto the anatase TiO 2 (101) slab surface through a carboxyl group. The geometries and electronic structures of the adsorption complexes were determined using periodic DFT based on the PWC/DNP method. The calculated adsorption energies indicate that the adsorbed dyes preferentially take configuration of the bidentate bridging rather than chelating or monodentate ester-type geometries. Furthermore, the azo compounds having two carboxyl groups are coordinated to the TiO 2 surface more preferentially through the carboxyl group connecting to the benzene skeleton than through that connecting to the naphthalene skeleton. The dihedral angles (Φ B-N ) between the benzene- and naphthalene-skeleton moieties are smaller than 10° for the adsorbed azo compounds containing one carboxyl group. In contrast, Φ B-N > 30° are obtained for the adsorbed azo compounds containing two carboxyl groups. The almost planar conformations of the former appear to strengthen both π-electrons conjugation and electronic coupling between low-lying unoccupied molecular orbitals of the azo dyes and the conduction band of TiO 2 . On the other hand, such coupling is very weak for the latter, leading to a shift of the Fermi level of TiO 2 in the lower-energy direction. The obtained results are useful to the design and synthesize novel azo-dye-based molecules that give rise to higher photovoltaic performances of the dye-sensitized solar cells. Copyright © 2017 Elsevier Inc. All rights reserved.

  1. JPL's On-Line Solar System Data Service

    NASA Astrophysics Data System (ADS)

    Giorgini, J. D.; Yeomans, D. K.; Chamberlin, A. B.; Chodas, P. W.; Jacobson, R. A.; Keesey, M. S.; Lieske, J. H.; Ostro, S. J.; Standish, E. M.; Wimberly, R. N.

    1996-09-01

    Numerous data products from the JPL ephemeris team are being made available via an interactive telnet computer service and separate web page. For over 15,000 comets and asteroids, 60 natural satellites, and 9 planets, users with an Internet connection can easily create and download information 24 hours a day, 7 days a week. These data include customized, high precision ephemerides, orbital and physical characteristics, and search-lists of comets and asteroids that match combinations of up to 39 different parameters. For each body, the user can request computation of more than 70 orbital and physical quantities. Ephemerides output can be generated in ICRF/J2000.0 and FK4/1950.0 reference frames with TDB, TT, or UTC timescales, as appropriate, at user specified intervals. Computed tables are derived from the same ephemerides used at JPL for radar astronomy and spacecraft navigation. The dynamics and computed observables include relativistic effects. Available ephemeris time spans currently range from A.D. 1599-2200 for the planets to a few decades for the satellites, comets and asteroids. Information on the interference from sunlight and moonlight is available. As an example of a few of the features available, we note that a user could easily generate information on satellite and planetary magnitudes, illuminated fractions, and the planetographic longitudes and latitudes of their centers and sub-solar points as seen from a particular observatory location on Earth. Satellite transits, occultations and eclipses are available as well. The resulting ASCII tables can be transferred to the user's host computer via e-mail, ftp, or kermit protocols. For those who have WWW access, the telnet solar system ephemeris service will be one feature of the JPL solar system web page. This page will provide up-to-date physical and orbital characteristics as well as current and predicted observing opportunities for all solar system bodies. Close Earth approaches and radar observations

  2. Determining Empirical Stellar Masses and Radii from Transits and Gaia Parallaxes as Illustrated by Spitzer Observations of KELT-11b

    NASA Astrophysics Data System (ADS)

    Beatty, Thomas G.; Stevens, Daniel J.; Collins, Karen A.; Colón, Knicole D.; James, David J.; Kreidberg, Laura; Pepper, Joshua; Rodriguez, Joseph E.; Siverd, Robert J.; Stassun, Keivan G.; Kielkopf, John F.

    2017-07-01

    Using the Spitzer Space Telescope, we observed a transit at 3.6 μm of KELT-11b. We also observed three partial planetary transits from the ground. We simultaneously fit these observations, ground-based photometry from Pepper et al., radial velocity data from Pepper et al., and a spectral energy distribution (SED) model using catalog magnitudes and the Hipparcos parallax to the system. The only significant difference between our results and those of Pepper et al. is that we find the orbital period to be shorter by 37 s, 4.73610 ± 0.00003 versus 4.73653 ± 0.00006 days, and we measure a transit center time of {{BJD}}{TDB} 2457483.4310 ± 0.0007, which is 42 minutes earlier than predicted. Using our new photometry, we precisely measure the density of the star KELT-11 to 4%. By combining the parallax and catalog magnitudes of the system, we are able to measure the radius of KELT-11b essentially empirically. Coupled with the stellar density, this gives a parallactic mass and radius of 1.8 {M}⊙ and 2.9 {R}⊙ , which are each approximately 1σ higher than the adopted model-estimated mass and radius. If we conduct the same fit using the expected parallax uncertainty from the final Gaia data release, this difference increases to 4σ. The differences between the model and parallactic masses and radii for KELT-11 demonstrate the role that precise Gaia parallaxes, coupled with simultaneous photometric, radial velocity, and SED fitting, can play in determining stellar and planetary parameters. With high-precision photometry of transiting planets and high-precision Gaia parallaxes, the parallactic mass and radius uncertainties of stars become 1% and 3%, respectively. TESS is expected to discover 60-80 systems where these measurements will be possible. These parallactic mass and radius measurements have uncertainties small enough that they may provide observational input into the stellar models themselves.

  3. Effects of mannan oligosaccharide dietary supplementation on performances of the tropical spiny lobsters juvenile (Panulirus ornatus, Fabricius 1798).

    PubMed

    Sang, Huynh Minh; Fotedar, Ravi

    2010-03-01

    The effects of dietary mannan oligosaccharide (MOS) (Bio-Mos, Alltech, USA) on the growth, survival, physiology, bacteria and morphology of the gut and immune response to bacterial infection of tropical rock lobsters (Panulirus ornatus) juvenile were investigated. Dietary inclusion level of MOS at 0.4% was tested against the control diet (trash fish) without MOS inclusion. At the end of 56 days of rearing period, a challenged test was also conducted to evaluate the bacterial infection resistant ability of the lobsters fed the two diets. Lobster juvenile fed MOS diet attained 2.86 +/- 0.07 g of total weigh and 66.67 +/- 4.76% survival rate which were higher (P < 0.05) than the lobsters fed control diet (2.35 +/- 0.14 g total weight and 54.76 +/- 2.38% survival rate, respectively) thus providing the higher (P < 0.05) specific growth rate (SGR) and average weekly gain (AWG) of lobsters fed MOS diet. Physiological condition indicators such as wet tail muscle index (Tw/B), wet hepatosomatic index (Hiw) and dry tail muscle index (Td/B) of the lobsters fed MOS supplemented diet were higher (P < 0.05) than that of the lobsters fed the control diet. Bacteria in the gut (both total aerobic and Vibrio spp.) and gut's absorption surface indicated by the internal perimeter/external perimeter ratio were also higher (P < 0.05) when the lobsters were fed MOS diet. Lobsters fed MOS diet were in better immune condition showed by higher THC and GC, and lower bacteraemia. Survival, THC, GC were not different among the lobsters fed either MOS or control diet after 3 days of bacterial infection while bacteraemia was lower in the lobsters fed MOS diet. After 7 days of bacterial infection the lobsters fed MOS diet showed higher survival, THC, GC and lower bacteraemia than the lobsters fed the control diet. The experimental trial demonstrated the ability of MOS to improve the growth performance, survival, physiological condition, gut health and immune responses of tropical spiny lobsters

  4. Analysis of One-Way Laser Ranging Data to LRO, Time Transfer and Clock Characterization

    NASA Technical Reports Server (NTRS)

    Bauer, S.; Hussmann, H.; Oberst, J.; Dirkx, D.; Mao, D.; Neumann, G. A.; Mazarico, E.; Torrence, M. H.; McGarry, J. F.; Smith, D. E.; hide

    2016-01-01

    We processed and analyzed one-way laser ranging data from International Laser Ranging Service ground stations to NASA's Lunar Reconnaissance Orbiter (LRO), obtained from June 13, 2009 until September 30, 2014. We pair and analyze the one-way range observables from station laser fire and spacecraft laser arrival times by using nominal LRO orbit models based on the GRAIL gravity field. We apply corrections for instrument range walk, as well as for atmospheric and relativistic effects. In total we derived a tracking data volume of approximately 3000 hours featuring 64 million Full Rate and 1.5 million Normal Point observations. From a statistical analysis of the dataset we evaluate the experiment and the ground station performance. We observe a laser ranging measurement precision of 12.3 centimeters in case of the Full Rate data which surpasses the LOLA (Lunar Orbiting Laser Altimeter) timestamp precision of 15 centimeters. The averaging to Normal Point data further reduces the measurement precision to 5.6 centimeters. We characterized the LRO clock with fits throughout the mission time and estimated the rate to 6.9 times10 (sup -8), the aging to 1.6 times 10 (sup -12) per day and the change of aging to 2.3 times 10 (sup -14) per day squared over all mission phases. The fits also provide referencing of onboard time to the TDB (Barycentric Dynamical Time) time scale at a precision of 166 nanoseconds over two and 256 nanoseconds over all mission phases, representing ground to space time transfer. Furthermore we measure ground station clock differences from the fits as well as from simultaneous passes which we use for ground to ground time transfer from common view observations. We observed relative offsets ranging from 33 to 560 nanoseconds and relative rates ranging from 2 times 10 (sup -13) to 6 times 10 (sup -12) between the ground station clocks during selected mission phases. We study the results from the different methods and discuss their applicability for time

  5. KELT-12b: A P ˜ 5 day, Highly Inflated Hot Jupiter Transiting a Mildly Evolved Hot Star

    NASA Astrophysics Data System (ADS)

    Stevens, Daniel J.; Collins, Karen A.; Gaudi, B. Scott; Beatty, Thomas G.; Siverd, Robert J.; Bieryla, Allyson; Fulton, Benjamin J.; Crepp, Justin R.; Gonzales, Erica J.; Coker, Carl T.; Penev, Kaloyan; Stassun, Keivan G.; Jensen, Eric L. N.; Howard, Andrew W.; Latham, David W.; Rodriguez, Joseph E.; Zambelli, Roberto; Bozza, Valerio; Reed, Phillip A.; Gregorio, Joao; Buchhave, Lars A.; Penny, Matthew T.; Pepper, Joshua; Berlind, Perry; Calchi Novati, Sebastiano; Calkins, Michael L.; D'Ago, Giuseppe; Eastman, Jason D.; Bayliss, D.; Colón, Knicole D.; Curtis, Ivan A.; DePoy, D. L.; Esquerdo, Gilbert A.; Gould, Andrew; Joner, Michael D.; Kielkopf, John F.; Labadie-Bartz, Jonathan; Lund, Michael B.; Manner, Mark; Marshall, Jennifer L.; McLeod, Kim K.; Oberst, Thomas E.; Pogge, Richard W.; Scarpetta, Gaetano; Stephens, Denise C.; Stockdale, Christopher; Tan, T. G.; Trueblood, Mark; Trueblood, Patricia

    2017-04-01

    We announce the discovery of KELT-12b, a highly inflated Jupiter-mass planet transiting the mildly evolved, V = 10.64 host star TYC 2619-1057-1. We followed up the initial transit signal in the KELT-North survey data with precise ground-based photometry, high-resolution spectroscopy, precise radial velocity measurements, and high-resolution adaptive optics imaging. Our preferred best-fit model indicates that the host star has {T}{eff} = 6279 ± 51 K, {log}{g}\\star = 3.89 ± 0.05, [Fe/H] = {0.19}-0.09+0.08, {M}* = {1.59}-0.09+0.07 {M}⊙ , and {R}* = 2.37 ± 0.17 {R}⊙ . The planetary companion has {M}{{P}} = 0.95 ± 0.14 {M}{{J}}, {R}{{P}} = {1.78}-0.16+0.17 {R}{{J}}, {log}{g}{{P}} = {2.87}-0.10+0.09, and density {ρ }{{P}} = {0.21}-0.05+0.07 g cm-3, making it one of the most inflated giant planets known. Furthermore, for future follow-up, we report a high-precision time of inferior conjunction in {{BJD}}{TDB} of 2,457,083.660459 ± 0.000894 and period of P=5.0316216+/- 0.000032 days. Despite the relatively large separation of ˜0.07 au implied by its ˜5.03-day orbital period, KELT-12b receives significant flux of {2.38}-0.29+0.32× {10}9 erg s-1 cm-2 from its host. We compare the radii and insolations of transiting gas giant planets around hot ({T}{eff}≥slant 6250 K) and cool stars, noting that the observed paucity of known transiting giants around hot stars with low insolation is likely due to selection effects. We underscore the significance of long-term ground-based monitoring of hot stars and space-based targeting of hot stars with the Transiting Exoplanet Survey Satellite to search for inflated gas giants in longer-period orbits.

  6. APC targeting enhances immunogenicity of a novel multistage Fc-fusion tuberculosis vaccine in mice.

    PubMed

    Soleimanpour, Saman; Farsiani, Hadi; Mosavat, Arman; Ghazvini, Kiarash; Eydgahi, Mohammad Reza Akbari; Sankian, Mojtaba; Sadeghian, Hamid; Meshkat, Zahra; Rezaee, Seyed Abdolrahim

    2015-12-01

    Numerous studies have demonstrated that targeting immunogens to FcγR on antigen-presenting cells (APCs) can selectively uptake and increase cellular immunity in vitro and in vivo. Therefore, the present study was conducted to evaluate immunogenicity of a novel multistage tuberculosis vaccine, a combination of an early and a dormant immunogenic protein, ESAT6 and HspX, fused to Fcγ2a fragment of mouse IgG2a to target all forms of tuberculosis. Codon-optimized genes consisting of ESAT6, a linker, and HspX fused either to mouse Fcγ2a (ESAT6:HspX:mFcγ2a) or 6× His-tag (ESAT6:HspX:His) were synthesized. The resulting proteins were then produced in Pichia pastoris. The fusion proteins were separately emulsified in dimethyldioctadecylammonium bromide(DDA)-trehalose-6,6-dibehenate(TDB) adjuvant, and their immunogenicity with and without bacille Calmette-Guérin (BCG) was assessed in C57BL/6 mice. Th1, Th2, Th17, and T-reg cytokine patterns were evaluated using the ELISA method. Both multistage vaccines induced very strong IL-12 and IFN-γ secretion from splenic cells; the Fc-tagged subunit vaccine induced a more effective Th1 immune response (IFN-γ, 910 pg/mL, and IL-12, 854 pg/mL) with a very low increase in IL-17 (∼0.1 pg/mL) and IL-4 (37 pg/mL) and a mild increase in TGF-β (543 pg/mL) compared to the BCG or ESAT6:HspX:His primed and boosted groups. The production of IFN-γ to ESAT6:HspX:Fcγ2a was very consistent and showed an increasing trend for IL-12 compared to the BCG or ESAT6:HspX:His primed and boosted groups. Fcγ2a used as a delivery vehicle supported the idea of selective uptake, inducing cross-presentation and forming a proper anti-tuberculosis response in context of Th1/Th2 and Th17/T-reg balances, which is important for protection and prevention of damage.

  7. On transformation between international celestial and terrestrial reference systems

    NASA Astrophysics Data System (ADS)

    Bretagnon, P.; Brumberg, V. A.

    2003-09-01

    Based on the current IAU hierarchy of the relativistic reference systems, practical formulae for the transformation between barycentric (BCRS) and geocentric (GCRS) celestial reference systems are derived. BCRS is used to refer to ICRS, International Celestial Reference System. This transformation is given in four versions, dependent on the time arguments used for BCRS (TCB or TDB) and for GCRS (TCG or TT). All quantities involved in these formulae have been tabulated with the use of the VSOP theories (IMCCE theories of motion of the major planets). In particular, these formulae may be applied to account for the indirect relativistic third-body perturbations in motion of Earth's satellites and Earth's rotation problem. We propose to use the SMART theory (IMCCE theory of Earth's rotation) in constructing the Newtonian three-dimensional spatial rotation transformation between GCRS and ITRS, the International Terrestrial Reference System. This transformation is compared with two other versions involving extra angular variables currently used by IERS, the International Earth Rotation Service. It is shown that the comparison of these three forms of the same transformation may be greatly simplified by using the proposed composite rotation formula. Tables 1-20 of Appendix B containing the initial terms of the VSOP-based series for the BCRS<->GCRS transformation are only available in electronic form at the CDS via anonymous ftp to cdsarc.u-strasbg.fr (130.79.128.5) or via http://cdsweb.u-strasbg.fr/cgi-bin/qcat?J/A+A/408/387. The work on ICRS<->GCRS transformation with the use of VSOP theories was done in February-March 2002 during the stay of the second author in IMCCE. The authors hoped to complete the second part concerning GCRS<->ITRS transformation with the use of SMART theory in September 2002 during the visit of the first author to IAA. The grave disease of Pierre Bretagnon which tragically resulted in his death on November 17, 2002, did not permit us to complete

  8. Sweating is greater in NCAA football linemen independently of heat production.

    PubMed

    Deren, Tomasz M; Coris, Eric E; Bain, Anthony R; Walz, Steve M; Jay, Ollie

    2012-02-01

    The study's purpose was to investigate whether differences in local sweat rates on the upper body between American football linemen (L) and backs (B) exist independently of differences in metabolic heat production. Twelve NCAA Division I American football players (6 linemen (mass = 141.6 ± 6.5 kg, body surface area (BSA) = 2.67 ± 0.08 m2) and 6 backs (mass = 88.1 ± 13.4 kg, BSA = 2.11 ± 0.19 m2)) cycled at a fixed metabolic heat production per unit BSA of 350 W·m(-2) for 60 min in a climatic chamber (t(db) [dry bulb temperature] = 32.4°C ± 1.0°C, t(wb) [wet bulb temperature] = 26.3°C ± 0.6°C, v [air velocity] = 0.9 ± 0.1 m·s(-1)). Local sweat rates on the head, arm, shoulder, lower back, and chest were measured after 10, 30, and 50 min of exercise. Core temperature, mean skin temperature, and HR were measured throughout exercise. Because metabolic heat production per unit surface area was fixed between participants, the rate of evaporation required for heat balance was similar (L = 261 ± 35 W·m(-2), B = 294 ± 30 W·m(-2), P = 0.11). However, local sweat rates on the head, arm, shoulder, and chest were all significantly greater (P < 0.05) in linemen at all time points, and end-exercise core temperature was significantly greater (P = 0.033) in linemen (38.5°C ± 0.4°C) relative to backs (38.0°C ± 0.2°C) despite a ∼25% lower heat production per unit mass. The change in mean skin temperature from rest was greater in linemen (P < 0.001) after 15, 30, 45, and 60 min, and HR was greater in linemen for the last 30 min of exercise. Football linemen sweat significantly more on the torso and head than football backs independently of any differences in metabolic heat production per unit BSA and therefore the evaporative requirements for heat balance. Despite greater sweating, linemen demonstrated significantly greater elevations in core temperature suggesting that sweating efficiency (i.e., the proportion of sweat that evaporates) was much lower in

  9. Effect of substituents on redox, spectroscopic and structural properties of conjugated diaryltetrazines--a combined experimental and theoretical study.

    PubMed

    Kurach, Ewa; Djurado, David; Rimarčik, Jan; Kornet, Aleksandra; Wlostowski, Marek; Lukeš, Vladimir; Pécaut, Jacques; Zagorska, Malgorzata; Pron, Adam

    2011-02-21

    Two series of new soluble conjugated compounds containing tetrazine central ring have been synthesized. The three-ring compounds have been synthesized by the reaction of aryl cyanide (where aryl = thienyl, alkylthienyl, phenyl or pyridyl) with hydrazine followed by oxidation of the intermediate product with diethyl azodicarboxylate. The five-ring compounds have been prepared using two pathways: (i) reaction of 5-cyano-2,2'-bithiophene (or its alkyl derivative) with hydrazine; (ii) via Suzuki or Stille coupling of 3,6-bis(5-bromo-2-thienyl)-1,2,4,5-tetrazine with a stannyl or boronate derivative of alkylthiophene. UV-vis spectroscopic properties of the synthesized compounds are strongly dependent on the nature of the aryl group, the position of the solubilizing substituent and the length of the molecule, showing the highest bathochromic shift (λ(max) > 440 nm) for five-ring compounds with alkyl groups attached to C(α) carbon in the terminal thienyl ring. An excellent linear correlation has been found for spectroscopically determined and theoretically calculated (TD-B3LYP/6-31G*) excitation energies. With the exception of dipyridyl derivative, the calculated lowest unoccupied molecular orbital (LUMO) level of the investigated molecules changes within a narrow range (from -2.63 to -2.41 eV), in line with the electrochemical data, which show a reversible reduction process with the redox potential varying from -1.23 V to -1.33 V (vs. Fc/Fc(+)). The electrochemically determined positions of the LUMO levels are consistently lower by 0.9 to 1.2 eV with respect to the calculated ones. All molecules readily crystallize. Single crystal studies of 3,6-bis(2,2'-bithien-5-yl)-1,2,4,5-tetrazine show that it crystallizes in a P2(1)/c space group whose structural arrangement is not very favorable to the charge carriers flow within the crystal. Powder diffraction studies of other derivatives have shown that their structural organization is sensitive to the position of the

  10. One project`s waste is another project`s resource

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on thismore » plan. Summaries of examples are presented in tables.« less

  11. Exercise thermoregulation in men after 1 and 24-hours of 6 degrees head-down tilt

    NASA Technical Reports Server (NTRS)

    Ertl, A. C.; Dearborn, A. S.; Weidhofer, A. R.; Bernauer, E. M.; Greenleaf, J. E.

    2000-01-01

    BACKGROUND: Exercise thermoregulation is dependent on heat loss by increased skin blood flow (convective and conductive heat loss) and through enhanced sweating (evaporative heat loss). Reduction of plasma volume (PV), increased plasma osmolality, physical deconditioning, and duration of exposure to simulated and actual microgravity reduces the ability to thermoregulate during exercise. HYPOTHESIS: We hypothesized that 24 h of head down tilt (HDT24) would alter thermoregulatory responses to a submaximal exercise test and result in a higher exercise rectal temperature (Tre) when compared with exercise Tre after 1 h of head down tilt (HDT1). METHODS: Seven men (31+/-SD 6 yr, peak oxygen uptake (VpO2peak) of 44+/-6 ml x kg(-1) x min(-1)) were studied during 70 min of supine cycling at 58+/-SE 1.5% VO2peak at 22.0 degrees C Tdb and 47% rh. RESULTS: Relative to pre-tilt sitting chair rest data, HDT1 resulted in a 6.1+/-0.9% increase and HDT24 in a 4.3+/-2.3% decrease in PV (delta = 10.4% between experiments, p<0.05) while plasma osmolality remained unchanged (NS). Pre-exercise Tre was elevated after HDT24 (36.71 degrees C +/-0.06 HDT1 vs. 36.93 degrees C+/-0.11 HDT24, p<0.05). The 70 min of exercise did not alter this relationship (p<0.05) with respective end exercise increases in Tre to 38.01 degrees C and 38.26 degrees C (degrees = 1.30 degrees C (HDT1) and 1.33 degrees C (HDT24)). While there were no pre-exercise differences in mean skin temperature (Tsk), a significant (p<0.05) time x treatment interaction occurred during exercise: after min 30 in HDT24 the Tsk leveled off at 31.1 degrees C, while it continued to increase reaching 31.5 degrees C at min 70 in HDT1. A similar response (NS) occurred in skin blood velocity. Neither local sweating rates nor changes in body weight during exercise of -1.63+/-0.24 kg (HDT1) or - 1.33+/-0.09 kg (HDT24) were different (NS) between experiments. CONCLUSION: While HDT24 resulted in elevated pre-exercise Tre, reduced PV

  12. Project management of life-science research projects: project characteristics, challenges and training needs.

    PubMed

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  13. Concentrating Solar Power Projects - Power Tower Projects | Concentrating

    Science.gov Websites

    (CSP) projects that use power tower systems are listed below-alphabetically by project name. You can browse a project profile by clicking on the project name. You can also find related information on power Aurora Solar Energy Project Copiapó Crescent Dunes Solar Energy Project (Tonopah) Dahan Power Plant DEWA

  14. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  15. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  16. An IS Project Management Course Project

    ERIC Educational Resources Information Center

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  17. Project Panama: An International Service Project

    ERIC Educational Resources Information Center

    Aydlett, Lydia; Randolph, Mickey; Wells, Gayle

    2010-01-01

    Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…

  18. Concentrating Solar Power Projects - Godawari Solar Project | Concentrating

    Science.gov Websites

    Solar Power | NREL Godawari Solar Project This page provides information on Godawari Solar Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Status Date: February 13, 2014 Project Overview Project Name: Godawari Solar

  19. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  20. Projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random networks.

    PubMed

    Feng, Cun-Fang; Xu, Xin-Jian; Wang, Sheng-Jun; Wang, Ying-Hai

    2008-06-01

    We study projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random networks. We relax some limitations of previous work, where projective-anticipating and projective-lag synchronization can be achieved only on two coupled chaotic systems. In this paper, we realize projective-anticipating and projective-lag synchronization on complex dynamical networks composed of a large number of interconnected components. At the same time, although previous work studied projective synchronization on complex dynamical networks, the dynamics of the nodes are coupled partially linear chaotic systems. In this paper, the dynamics of the nodes of the complex networks are time-delayed chaotic systems without the limitation of the partial linearity. Based on the Lyapunov stability theory, we suggest a generic method to achieve the projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random dynamical networks, and we find both its existence and sufficient stability conditions. The validity of the proposed method is demonstrated and verified by examining specific examples using Ikeda and Mackey-Glass systems on Erdos-Renyi networks.

  1. Project-Based Teaching: Helping Students Make Project Connections

    NASA Astrophysics Data System (ADS)

    Johnson, Heather Jo Pusich

    Project-based curriculum materials are designed to support students in engaging with scientific content and practices in meaningful ways, with the goal of improving students' science learning. However, students need to understand the connections between what they are doing on a day-to-day basis with respect to the goals of the overall project for students to get the motivational and cognitive benefits of a project-based approach. In this dissertation, I looked at the challenges that four ninth grade science teachers faced as they helped students to make these connections using a project-based environmental science curriculum. The analysis revealed that in general when the curriculum materials made connections explicit, teachers were better able to articulate the relationship between the lesson and the project during enactment. However, whether the connections were explicit or implicit in the materials, enactments of the same lesson across teachers revealed that teachers leveraged different aspects of the project context in different ways depending on their knowledge, beliefs, and goals about project-based teaching. The quantitative analysis of student data indicated that when teacher enactments supported project goals explicitly, students made stronger connections between a lesson and the project goal. Therefore, a teacher's ability to make clear connections during classroom instruction is essential. Furthermore, when students made connections between each lesson and the larger project goals their attitudes toward the lesson were more positive and they performed better on the final assessment. These findings suggest that connections between individual lessons and the goals of the project are critical to the effectiveness of project-based learning. This study highlights that while some teachers were able to forge these connections successfully as a result of leveraging cognitive resources, teachers' beliefs, knowledge and goals about project-based teaching are

  2. Concentrating Solar Power Projects - Parabolic Trough Projects |

    Science.gov Websites

    Project Godawari Solar Project Gujarat Solar One Gulang 100MW Thermal Oil Parabolic Trough project Guzmán Kuraymat (ISCC Kuraymat) Kathu Solar Park KaXu Solar One KVK Energy Solar Project La Africana La Dehesa La Power Facility Nevada Solar One (NSO) NOOR I NOOR II Olivenza 1 Orellana Palma del Río I Palma del Río

  3. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  4. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less

  5. Concentrating Solar Power Projects - Genesis Solar Energy Project |

    Science.gov Websites

    Concentrating Solar Power | NREL Genesis Solar Energy Project This page provides information on the Genesis Solar Energy Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. The Project includes two 125-MW units incorporating

  6. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    PubMed

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  7. Project Notes

    ERIC Educational Resources Information Center

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  8. Concentrating Solar Power Projects - eCare Solar Thermal Project |

    Science.gov Websites

    Concentrating Solar Power | NREL eCare Solar Thermal Project This page provides information on eCare Solar Thermal Project, a concentrating solar power (CSP) project, with data organized by Project Name: eCare Solar Thermal Project Country: Morocco Location: Undefined Owner(s): CNIM (100

  9. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  10. Shop Projects.

    ERIC Educational Resources Information Center

    Patton, Bob

    Vocational agriculture teachers in Oklahoma prepared the shop project drawings which comprise the document. Seventy-one projects, with lists of required materials, diagrams, and measurements, are included. Construction projects fall into six categories (number of projects in parentheses): Trailers (5), racks (3), livestock production projects…

  11. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  12. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    NASA Astrophysics Data System (ADS)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  13. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  14. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  15. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  16. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  17. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  18. Concentrating Solar Power Projects - eLLO Solar Thermal Project |

    Science.gov Websites

    Concentrating Solar Power | NREL eLLO Solar Thermal Project This page provides information on Llo Solar Thermal Project, a concentrating solar power (CSP) project, with data organized by Name: eLLO Solar Thermal Project (Llo) Country: France Location: Llo (Pyrénées Orientales) Owner(s

  19. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    ERIC Educational Resources Information Center

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  20. Climate Projections from the NARCliM Project: Bayesian Model Averaging of Maximum Temperature Projections

    NASA Astrophysics Data System (ADS)

    Olson, R.; Evans, J. P.; Fan, Y.

    2015-12-01

    NARCliM (NSW/ACT Regional Climate Modelling Project) is a regional climate project for Australia and the surrounding region. It dynamically downscales 4 General Circulation Models (GCMs) using three Regional Climate Models (RCMs) to provide climate projections for the CORDEX-AustralAsia region at 50 km resolution, and for south-east Australia at 10 km resolution. The project differs from previous work in the level of sophistication of model selection. Specifically, the selection process for GCMs included (i) conducting literature review to evaluate model performance, (ii) analysing model independence, and (iii) selecting models that span future temperature and precipitation change space. RCMs for downscaling the GCMs were chosen based on their performance for several precipitation events over South-East Australia, and on model independence.Bayesian Model Averaging (BMA) provides a statistically consistent framework for weighing the models based on their likelihood given the available observations. These weights are used to provide probability distribution functions (pdfs) for model projections. We develop a BMA framework for constructing probabilistic climate projections for spatially-averaged variables from the NARCliM project. The first step in the procedure is smoothing model output in order to exclude the influence of internal climate variability. Our statistical model for model-observations residuals is a homoskedastic iid process. Comparing RCMs with Australian Water Availability Project (AWAP) observations is used to determine model weights through Monte Carlo integration. Posterior pdfs of statistical parameters of model-data residuals are obtained using Markov Chain Monte Carlo. The uncertainty in the properties of the model-data residuals is fully accounted for when constructing the projections. We present the preliminary results of the BMA analysis for yearly maximum temperature for New South Wales state planning regions for the period 2060-2079.

  1. Map projections

    USGS Publications Warehouse

    ,

    1993-01-01

    A map projection is used to portray all or part of the round Earth on a flat surface. This cannot be done without some distortion. Every projection has its own set of advantages and disadvantages. There is no "best" projection. The mapmaker must select the one best suited to the needs, reducing distortion of the most important features. Mapmakers and mathematicians have devised almost limitless ways to project the image of the globe onto paper. Scientists at the U. S. Geological Survey have designed projections for their specific needs—such as the Space Oblique Mercator, which allows mapping from satellites with little or no distortion. This document gives the key properties, characteristics, and preferred uses of many historically important projections and of those frequently used by mapmakers today.

  2. Projection, introjection, and projective identification: a reformulation.

    PubMed

    Malancharuvil, Joseph M

    2004-12-01

    In this essay, the author recommends a reformulation of the psychoanalytic concept of projection. The author proposes that projective processes are not merely defensive maneuvers that interfere with perception, but rather an essential means by which human perception is rendered possible. It is the manner in which human beings test and-evaluate reality in terms of their experiential structure, and their needs for survival and nourishment. Projection is the early phase of introjection.

  3. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  4. Concentrating Solar Power Projects - Linear Fresnel Reflector Projects |

    Science.gov Websites

    Kimberlina solar thermal power plant, a linear Fresnel reflector system located near Bakersfield, California Solar Thermal Project eLLO Solar Thermal Project (Llo) IRESEN 1 MWe CSP-ORC pilot project Kimberlina Solar Thermal Power Plant (Kimberlina) Liddell Power Station Puerto Errado 1 Thermosolar Power Plant

  5. Project Scoping Guidebook for Metropolitan Planning Organization Transportation Projects

    DOT National Transportation Integrated Search

    2017-08-01

    To obtain state and federal funding for proposed transportation projects in metropolitan areas, local governments submit project proposals to their Metropolitan Planning Organization (MPO) during the early stages of project planning. The purpose of t...

  6. Manpower Projection Model Project, Ventura County.

    ERIC Educational Resources Information Center

    Van Zant, John L.; Lawson, William H.

    The final report on Phase 1 of the Manpower Projection Model (MPM) Project provides a guide for implementation of the model system by area Vocational Education Practitioners within any Standard Metropolitan Statistical Area (SMSA). A cooperative effort between Ventura County Superintendent of Schools Office and the Community College District, the…

  7. Watchdog Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett; Campbell, Jack; Hadley, Mark

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to havemore » strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the

  8. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as

  9. ART/Ada design project, phase 1: Project plan

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.

    1988-01-01

    The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

  10. Project: "Project!"

    ERIC Educational Resources Information Center

    Grayson, Katherine

    2007-01-01

    In November 2006, the editors of "Campus Technology" launched their first-ever High-Resolution Projection Study, to find out if the latest in projector technology could really make a significant difference in teaching, learning, and educational innovation on US campuses. The author and her colleagues asked campus educators,…

  11. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  12. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  13. Perceptions of Project Representatives Concerning Project Success and Pre-Project Planning Effort

    DTIC Science & Technology

    1993-12-01

    25 Table 2. What are your main reasons for the project’s level of success? ........... 28 Table 3. What , if anything...Table 3a. Other Categories for Table 3 .......................................................... 32 Table 4. What are your main reasons for your...assessment of the level of effort expended on pre-project planning? ............................. ....... .. .......... .. . .. 33 Table 5. What concerning

  14. Highlight removal based on the regional-projection fringe projection method

    NASA Astrophysics Data System (ADS)

    Qi, Zhaoshuai; Wang, Zhao; Huang, Junhui; Xing, Chao; Gao, Jianmin

    2018-04-01

    In fringe projection profilometry, highlight usually causes the saturation and blooming in captured fringes and reduces the measurement accuracy. To solve the problem, a regional-projection fringe projection (RP-FP) method is proposed. Regional projection patterns (RP patterns) are projected onto the tested object surface to avoid the saturation and blooming. Then, an image inpainting technique is employed to reconstruct the missing phases in the captured RP patterns and a complete surface of the tested object is obtained. Experiments verified the effectiveness of the proposed method. The method can be widely used in industrial inspections and quality controlling in mechanical and manufacturing industries.

  15. Science project

    NASA Image and Video Library

    2012-08-23

    DRIFTER sensor devices were designed by the Applied Science and Technology Project Office as inexpensive tools that can be used for science projects in local schools. The devices transmit information about water temperature and conductivity for use by Gulf Coast researchers. The DRIFTER project began as an effort to help Gulf Coast oyster fishermen dealing with the effects of fresh water intrusion.

  16. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  17. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  18. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  19. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  20. Project HOLD: A Secondary Learning Disability Project.

    ERIC Educational Resources Information Center

    Snyder, Marjorie Sims

    This document discusses Project HOLD, a Title VI-G Child Service Demonstration Center which was established as a cooperative effort between Northeast Louisiana University and the Ouachita Parish School System. The primary purpose of the project is to plan, explore, implement, and refine a program for students in grades 7 through 12 who have been…

  1. GHPsRUS Project

    DOE Data Explorer

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  2. Educational Project Management Instructional System. Module One. Project Management Executive Orientation.

    ERIC Educational Resources Information Center

    Cummings, C. Peter; Cook, Desmond L.

    This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…

  3. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  4. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    ERIC Educational Resources Information Center

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  5. Concentrating Solar Power Projects - Hami 50 MW CSP Project | Concentrating

    Science.gov Websites

    Solar Power | NREL Hami 50 MW CSP Project Status Date: April 6, 2018 Project Overview Project MW Status: Under construction Do you have more information, corrections, or comments? Background Technology: Power tower Status: Under construction Country: China City: Hami Region: Xinjiang Autonomous

  6. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  7. Underestimation of Project Costs

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  8. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    NASA Astrophysics Data System (ADS)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  9. 51. Projection room, looking SW. Original Movietone projection equipment intact. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Projection room, looking SW. Original Movietone projection equipment intact. Old photo label identifying directional view is inaccurate. This image proves the projection room was expanded southward from its original design prior to the theatre's opening (see also photo WA-197-36). - Fox Theater, Seventh Avenue & Olive Way, Seattle, King County, WA

  10. The Inter-Sectoral Impact Model Intercomparison Project (ISI–MIP): Project framework

    PubMed Central

    Warszawski, Lila; Frieler, Katja; Huber, Veronika; Piontek, Franziska; Serdeczny, Olivia; Schewe, Jacob

    2014-01-01

    The Inter-Sectoral Impact Model Intercomparison Project offers a framework to compare climate impact projections in different sectors and at different scales. Consistent climate and socio-economic input data provide the basis for a cross-sectoral integration of impact projections. The project is designed to enable quantitative synthesis of climate change impacts at different levels of global warming. This report briefly outlines the objectives and framework of the first, fast-tracked phase of Inter-Sectoral Impact Model Intercomparison Project, based on global impact models, and provides an overview of the participating models, input data, and scenario set-up. PMID:24344316

  11. Little River Project.

    ERIC Educational Resources Information Center

    Naisbitt, Ian

    1995-01-01

    Describes the adoption of an old riverside landfill by an elementary school as a Habitat 2000 community project. Contains a "how-to" checklist for such a project, information on building school-community community partnerships, and promotional ideas for stewardship projects. (LZ)

  12. 40 CFR 403.20 - Pretreatment Program Reinvention Pilot Projects Under Project XL.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Pretreatment Program Reinvention Pilot Projects Under Project XL. 403.20 Section 403.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... OF POLLUTION § 403.20 Pretreatment Program Reinvention Pilot Projects Under Project XL. The Approval...

  13. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  14. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  15. The Environmental Management Project Manager`s Handbook for improved project definition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, whichmore » is the focus of this handbook.« less

  16. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    ERIC Educational Resources Information Center

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  17. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  18. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  19. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  20. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  1. Research Projects 1968.

    ERIC Educational Resources Information Center

    Swedish Council for Personnel Administration, Stockholm.

    The 39 research projects described cover several fields within the social and behavioral sciences related to personnel administration. The project description format includes: (1) project title, (2) principal investigator, (3) institution, (4) advisor, (5) grants, (6) background and purpose, (7) scope, material, methods, experimental design, (8)…

  2. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  3. Cooperative Projects - Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Schubotz, Wiebke; Brücher, Tim; Vamborg, Freja

    2017-04-01

    Today's research in Germany is often organized in large projects and collaborations, so-called cooperative projects ("Verbundprojekte" in German). These projects are defined by a large number of members (more than 50) and participating institutes, e.g. institutes of research organizations such as the Max-Planck society and the Leibniz association, Helmholtz centres, and universities. For coordination purposes these projects usually have a general project manager or project coordinator close to the speaker of the project. Despite this overarching position, it is often challenging for the project manager to really overview the entire project as he is, for example, not involved in the individual institute's recruitment processes or research connections to other institutes via other projects. Additionally, there is neither a formal obligation for the principal investigators and project scientists to report changes within their sub-projects, nor any formal dependency between these sub-projects and the coordination office to ensure a contemporary update of changes and progress in their specific tasks of the project. Therefore, the idea of a coordinating position to oversee the entire cooperative project is sometimes difficult to reach. Furthermore, project managers usually have no formal connection to other project managers. This means that recurrent tasks, for which cooperation between project managers would be helpful, need to be reinvented for each project anew. Due to the lack of this more formalized cooperation between project managers, acquired expertise is often lost. We will illustrate the challenges of this kind of project management based on projects at the Max Planck Institute for Meteorology (Hamburg) and the Helmholtz Centre for Ocean Research (GEOMAR, Kiel), but also point out opportunities that arise within a large collaboration of partners. Moreover, we present an approach to coordinate management processes in order to overcome some of the aforementioned

  4. The Proposal Project

    ERIC Educational Resources Information Center

    Pierce, Elizabeth

    2007-01-01

    The proposal project stretches over a significant portion of the semester-long sophomore course Professional Communication (ENG 250) at Monroe Community College. While developing their proposal project, students need to use time management skills to successfully complete a quality project on time. In addition, excellent oral and written…

  5. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  6. Past Project Expo Sites

    EPA Pesticide Factsheets

    This page provides information for Project Expo sites that were featured at the LMOP Conferences in 2013 and 2014. Project Expo sites were featured as being interested in identifying project partners for the development of an LFG energy project.

  7. Simple projects guidebook : federal-aid procedure for simple projects

    DOT National Transportation Integrated Search

    2002-06-01

    Experience has shown that a simple project generally 1) does not have any right-of-way involvement and 2) has a Programmatic Categorical Exclusion or Categorical Exclusion environmental determination. Page 7 outlines the definition of simple projects...

  8. Projection: A Bibliography.

    ERIC Educational Resources Information Center

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  9. Harvard Observing Project (HOP): Involving Undergraduates in Research Projects

    NASA Astrophysics Data System (ADS)

    Bieryla, Allyson

    2017-01-01

    The Harvard Observing Project (HOP) is designed to get students excited about observational astronomy while collecting data valuable to the scientific community. The primary goal is to give undergraduates a chance to try out observing with “no strings attached”. Observations are led by experienced observers, mostly graduate students. This not only gives graduate students extra opportunities to interact and teach undergraduates, but also a chance for them to get more observing experience. Each semester, we choose an interesting target and monitor it each week over the course of the semester using Harvard University’s 16-inch DFM Clay Telescope. These observing projects often produce large amounts of data. This provides an excellent dataset for a young undergraduate to analyze. Some successful semester-long observing projects have included variable stars, supernova and binary systems. Short-term projects have included exoplanet candidate followup, asteroid and comet followup and collaborating with the Pro-Am White Dwarf Monitoring (PAWM) project in attempts to detect a transiting Earth-sized planet orbiting a white dwarf. Each dataset is an opportunity for an undergraduate to be introduced to scientific research and present the results to the community.

  10. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  11. Post-project geomorphic assessment of a large process-based river restoration project

    USGS Publications Warehouse

    Erwin, Susannah O.; Schmidt, John C.; Allred, Tyler M.

    2016-01-01

    This study describes channel changes following completion of the Provo River Restoration Project (PRRP), the largest stream restoration project in Utah and one of the largest projects in the United States in which a gravel-bed river was fully reconstructed. We summarize project objectives and the design process, and we analyze monitoring data collected during the first 7 years after project completion. Post-project channel adjustment during the study period included two phases: (i) an initial phase of rapid, but small-scale, adjustment during the first years after stream flow was introduced to the newly constructed channel and (ii) a subsequent period of more gradual topographic adjustment and channel migration. Analysis of aerial imagery and ground-survey data demonstrate that the channel has been more dynamic in the downstream 4 km where a local source contributes a significant annual supply of bed material. Here, the channel migrates and exhibits channel adjustments that are more consistent with project objectives. The upstream 12 km of the PRRP are sediment starved, the channel has been laterally stable, and this condition may not be consistent with large-scale project objectives.

  12. The Sidewalk Project

    ERIC Educational Resources Information Center

    Church, William

    2005-01-01

    In this article, the author features "the sidewalk project" in Littleton High School. The sidewalk project is a collaboration of more than 40 high school physics students, 10 local mentors, and a few regional and national organizations who worked together to invent a way to heat a sidewalk with an alternative energy source. The project, which…

  13. Designing Effective Projects: Decision Options for Maximizing Learning and Project Success

    ERIC Educational Resources Information Center

    Volkema, Roger J.

    2010-01-01

    In recent years, more and more business schools have introduced team-based projects into their curricula as a means of addressing corporate, small business, and community-service issues while teaching students a variety of project management skills (technical and sociocultural). In designing a project-oriented course, an instructor has a number of…

  14. The Project Approach Catalog 2 by the Project Approach Study Group.

    ERIC Educational Resources Information Center

    Helm, Judy Harris, Ed.

    Projects are in-depth studies of a topic undertaken by a class, a group, or an individual child. Projects are intended to strengthen children's dispositions to be interested, absorbed, and involved in in-depth observation, investigation, and representation of worthwhile phenomena in their own environments. This Catalog on the Project Approach, the…

  15. Project Lodestar Special Report.

    ERIC Educational Resources Information Center

    Brown, Peggy, Ed.

    1981-01-01

    The Association of American Colleges' (AAC) Project Lodestar is addressed in an article and descriptions of the pilot phase of the project at 13 institutions. In "Project Lodestar: Realistically Assessing the Future," Peggy Brown provides an overview of the project, which is designed to help colleges and universities in assessment of…

  16. Project CHECO Southeast Asia Report. Project RED HORSE

    DTIC Science & Technology

    1969-09-01

    It 0,Il 1IC1I lll Examination of C’urrentI,,,,,,,,[ I prations IIR / IE IP𔃻 0 R IT - PROJECT RED HORSE 1 SEPTEMBER 1969 HQ PACAF Directorate...3 CHAPTER II RED HORSE ORGANIZATIONS IN SOUTHEAST ASIA .................. 5 Introduction...RED HORSE Combat Defense Teams....................... ...... 59 III. 555th CES (HR) Projects...................................... 62 IV. 820th CES

  17. Project CLIMB.

    ERIC Educational Resources Information Center

    DeLucca, Adolph

    1982-01-01

    As a state and national model for a basic skills curriculum for Kindergarten through grade 12 students, Coordination Learning Integration--Middlesex Basics (Project CLIMB) is described. The unified system was developed by teachers with administrative support to accomodate all students' reading and mathematics needs. Project CLIMB's development and…

  18. Puerto Rico`s EcoElectrica LNG/power project marks a project financing first

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lammers, R.; Taylor, S.

    1998-02-23

    On Dec. 15, 1997, Enron International and Kenetech Energy Services achieved financial close on the $670 million EcoElectrica liquefied natural gas terminal and cogeneration project proposed for Puerto Rico. The project involves construction of a liquefied natural gas terminal, cogeneration plant, and desalination unit on the southern coast of Puerto Rico, in the Penuelas/Guayanilla area. EcoElectrica will include a 500-mw, combined-cycle cogeneration power plant fueled mainly by LNG imported from the 400 MMcfd Atlantic LNG project on the island of Trinidad. Achieving financial close on a project of this size is always a time-consuming matter and one with a numbermore » of challenges. These challenges were increased by the unique nature of both the project and its financing--no project financing had ever before been completed that combined an LNG terminal and power plant. The paper discusses the project, financing details and challenges, key investment considerations, and integrated project prospects.« less

  19. Flat-plate solar array project. Volume 8: Project analysis and integration

    NASA Technical Reports Server (NTRS)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  20. The Canada Goose Project: A First Project with Children under 3

    ERIC Educational Resources Information Center

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  1. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    PubMed

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  2. Earth System Science Project

    ERIC Educational Resources Information Center

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  3. Interactions of the NAEG information support project with other projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pfuderer, H.A.

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site. (auth)

  4. Thermodynamic description of Tc(iv) solubility and hydrolysis in dilute to concentrated NaCl, MgCl2 and CaCl2 solutions.

    PubMed

    Yalçıntaş, Ezgi; Gaona, Xavier; Altmaier, Marcus; Dardenne, Kathy; Polly, Robert; Geckeis, Horst

    2016-06-07

    TcO(OH)3(-) previously selected by NEA-TDB. In concentrated MgCl2 and CaCl2 solutions with pHm≥ 8, the formation of the ternary Mg3[TcO(OH)5](3+) and Ca3[TcO(OH)5](3+) species is proposed based on the slope analysis of the solubility data, model calculations and previous observations for analogous An(iv) and Zr(iv) systems. The formation and stability of these hitherto unknown Tc(iv) species are supported by DFT calculations. Based on the newly generated experimental data and previous spectroscopic observations, new comprehensive chemical, thermodynamic and activity models (SIT, Pitzer) for these systems are derived.

  5. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  6. NCMS ESS 2000 Project

    NASA Technical Reports Server (NTRS)

    Gibbel, Mark; Bellamy, Marvin; DeSantis, Charlie; Hess, John; Pattok, Tracy; Quintero, Andrew; Silver, R.

    1996-01-01

    ESS 2000 has the vision of enhancing the knowledge necessary to implement cost-effective, leading-edge ESS technologies and procedures in order to increase U.S. electronics industry competitiveness. This paper defines EES and discusses the factors driving the project, the objectives of the project, its participants, the three phases of the project, the technologies involved, and project deliverables.

  7. The 100 People Project

    ERIC Educational Resources Information Center

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  8. KSC History Project

    NASA Technical Reports Server (NTRS)

    Dethloff, Henry C.

    2001-01-01

    The KSC History Project focuses on archival research and oral history interviews on the history of Kennedy Space Center (KSC). Related projects include the preparation of a precis and chapter outline for a proposed book-length narrative history, a bibliography of key primary and secondary resources, a brief monograph overview of the history of KSC, and a monograph on the history of safety at the Center. Finally, there is work on the development of a web page and a personal history data base associated with the oral history project. The KSC History Project has been a joint endeavor between Henry C. Dethloff and Dr. Noble Lee Snaples, Jr.

  9. Sliding Window Generalized Kernel Affine Projection Algorithm Using Projection Mappings

    NASA Astrophysics Data System (ADS)

    Slavakis, Konstantinos; Theodoridis, Sergios

    2008-12-01

    Very recently, a solution to the kernel-based online classification problem has been given by the adaptive projected subgradient method (APSM). The developed algorithm can be considered as a generalization of a kernel affine projection algorithm (APA) and the kernel normalized least mean squares (NLMS). Furthermore, sparsification of the resulting kernel series expansion was achieved by imposing a closed ball (convex set) constraint on the norm of the classifiers. This paper presents another sparsification method for the APSM approach to the online classification task by generating a sequence of linear subspaces in a reproducing kernel Hilbert space (RKHS). To cope with the inherent memory limitations of online systems and to embed tracking capabilities to the design, an upper bound on the dimension of the linear subspaces is imposed. The underlying principle of the design is the notion of projection mappings. Classification is performed by metric projection mappings, sparsification is achieved by orthogonal projections, while the online system's memory requirements and tracking are attained by oblique projections. The resulting sparsification scheme shows strong similarities with the classical sliding window adaptive schemes. The proposed design is validated by the adaptive equalization problem of a nonlinear communication channel, and is compared with classical and recent stochastic gradient descent techniques, as well as with the APSM's solution where sparsification is performed by a closed ball constraint on the norm of the classifiers.

  10. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    ERIC Educational Resources Information Center

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  11. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  12. Fourth Year Status Report. Computerized Training Systems Project. Project ABACUS.

    DTIC Science & Technology

    1976-08-01

    in 7 9. PERFORMING ORGANIZATION NAME AND ADOMEN ,,, 10. PROGRAM ELEMENT. PROJECT , TASK US Army Tra ining Support Center A R E A S WORK UNIT NUMBERS...transp ired during the fourth year of Project ABACUS, the A rmy ’s program for the development of a Computerized Training System. It inc l udes a...have transpired durlnq the fourth year of Project ABACUS, the Army ’s program for the developmen t o~ aprototype Computer i zed Training System. It

  13. Project Wild (Project Tame).

    ERIC Educational Resources Information Center

    Siegenthaler, David

    For 37 states in the United States, Project Wild has become an officially sanctioned, distributed and funded "environemtnal and conservation education program." For those who are striving to implement focused, sequential, learning programs, as well as those who wish to promote harmony through a non-anthropocentric world view, Project…

  14. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  15. The Human Genome Diversity Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cavalli-Sforza, L.

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planningmore » stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.« less

  16. Mercury Project

    NASA Image and Video Library

    1959-04-27

    Astronaut L. Gordon Cooper, Jr., one of the original seven astronauts for Mercury Project selected by NASA on April 27, 1959. The MA-9 mission, boosted by the Mercury-Atlas launch vehicle, was the last flight of the Mercury Project. The Faith 7 spacecraft orbited the Earth 22 times in 1-1/2 days.

  17. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    ERIC Educational Resources Information Center

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  18. Determinants of project success

    NASA Technical Reports Server (NTRS)

    Murphy, D. C.; Baker, B. N.; Fisher, D.

    1974-01-01

    The interactions of numerous project characteristics, with particular reference to project performance, were studied. Determinants of success are identified along with the accompanying implications for client organization, parent organization, project organization, and future research. Variables are selected which are found to have the greatest impact on project outcome, and the methodology and analytic techniques to be employed in identification of those variables are discussed.

  19. Project HIRE.

    ERIC Educational Resources Information Center

    Weisz, Vera C.

    Project HIRE is a special program conducted by Middlesex Community College since October 1978 to help people 55 years of age and older find paid employment. The specific goals of the project, as it was originally conceived, were to: (1) open three intake centers; (2) register clients at the centers; (3) provide career counseling; (4) offer…

  20. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  1. Evaluation of Project Symbiosis: An Interdisciplinary Science Education Project.

    ERIC Educational Resources Information Center

    Altschuld, James W.

    1993-01-01

    The goal of this report is to provide a summary of the evaluation of Project Symbiosis which focused on enhancing the teaching of science principles in high school agriculture courses. The project initially involved 15 teams of science and agriculture teachers and was characterized by an extensive evaluation component consisting of six formal…

  2. The project management office: transforming healthcare in the context of a hospital redevelopment project.

    PubMed

    Richer, Marie-Claire; Marchionni, Caroline; Lavoie-Tremblay, Melanie; Aubry, Monique

    2013-01-01

    It has been shown that classifying projects into a typology allows improved allocation of resources and promotes project success. However, a typology of healthcare projects has yet to be developed. The projects encountered by the Transition Support Office at the McGill University Health Centre in Montreal, Quebec, where a major redevelopment project is under way, were classified into a typology unique to the healthcare context. Examples of the 3 project types, Process, People, and Practice, are provided to clarify the specific support strategies and context-adapted interventions that were instrumental to their success.

  3. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  4. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    ERIC Educational Resources Information Center

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  5. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  6. Project ArchimedeZ

    DTIC Science & Technology

    2015-05-18

    of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering...describe the proposed content of Project ArchimedeZ, 4 ) describe incentives that Project ArchimedeZ will give to Total Force Airmen to participate and...engaged, most of the time, in some sort of PME but at a manageable level. Rather than a three- hour block, for example, Project ArchimedeZ would deliver

  7. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  8. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume I. Project conceptual design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) Project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The Project conceptual design is presented in this volume.« less

  9. An Innovative Project in Educational Technology: The Panama-Venezuela Project.

    ERIC Educational Resources Information Center

    Rojas, Alicia Mabel

    1980-01-01

    Describes a project which is being implemented in the field of educational technology in Panama and Venezuela. The project emphasizes inservice training of a cadre of professionals who will direct efforts to identify and resolve significant problems in education. (Author/CHC)

  10. SDN Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustainmore » critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  11. Project Artemis

    NASA Technical Reports Server (NTRS)

    Birchenough, Shawn; Kato, Denise; Kennedy, Fred; Akin, David

    1990-01-01

    The goals of Project Artemis are designed to meet the challege of President Bush to return to the Moon, this time to stay. The first goal of the project is to establish a permanent manned base on the Moon for the purposes of scientific research and technological development. The knowledge gained from the establishment and operations of the lunar base will then be used to achieve the second goal of Project Artemis, the establishment of a manned base on the Martian surface. Throughout both phases of the program, crew safety will be the number one priority. There are four main issues that have governed the entire program: crew safety and mission success, commonality, growth potential, and costing and scheduling. These issues are discussed in more detail.

  12. Research Projects for Undergraduates

    NASA Astrophysics Data System (ADS)

    Troncalli, Andra

    2010-03-01

    Physics majors, by enrolling in our research experience in physics course, have the opportunity to work in small groups on independent research projects. Over the last few years, I have directed a few of these research projects; some were closely related to my own research in the field of high temperature superconductivity, and students participated in growing and characterizing samples. Other projects involved nanotechnology, Hall probes, and programming in LabVIEW. For some students, this was their very first research project, while others had more experience. I will talk about the projects and about the particular type of challenges and benefits this type of course brings to both students and instructors.

  13. The Role of the Project Management Office on Information Technology Project Success

    ERIC Educational Resources Information Center

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  14. The Interactions among Information Technology Organizational Learning, Project Learning, and Project Success

    ERIC Educational Resources Information Center

    McKay, Donald S., II

    2012-01-01

    Knowledge gained from completed information technology (IT) projects was not often shared with emerging project teams. Learning lessons from other project teams was not pursued because people lack time, do not see value in learning, fear a potentially painful process, and had concerns that sharing knowledge will hurt their career. Leaders could…

  15. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  16. I-15 North Project

    DOT National Transportation Integrated Search

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  17. Project management process.

    DOT National Transportation Integrated Search

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  18. "Cheesy Pizza": The Pizza Project

    ERIC Educational Resources Information Center

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  19. Political polarization projection: social projection of partisan attitude extremity and attitudinal processes.

    PubMed

    Van Boven, Leaf; Judd, Charles M; Sherman, David K

    2012-07-01

    What influences perceptions of political polarization? The authors examine the polarization of people's own political attitudes as a source of perceived polarization: Individuals with more extreme partisan attitudes perceive greater polarization than individuals with less extreme partisan attitudes. This "polarization projection" was demonstrated in 3 studies in which people estimated the distribution of others' political attitudes: one study with a nationally representative sample concerning the 2008 presidential election, and 2 studies concerning university students evaluating a policy regarding scarce resource allocation. These studies demonstrate that polarization projection occurs simultaneously with and independently of simple projection, the tendency to assume that others share one's partisan political attitudes. Polarization projection may occur partly because people assume that others engage in similar attitudinal processes as the self, such as extensive thought and emotional arousal. The projection of various attitudinal processes was demonstrated in a study concerning health care reform policies. Further supporting this explanation, polarization projection increased when people introspected about their own attitudinal processes, which increased the accessibility of those processes. Implications for perceptions of partisanship, social judgment, and civic behavior are discussed.

  20. Elective Program Projects

    ERIC Educational Resources Information Center

    Estrada, Christelle

    1976-01-01

    Outlined is an interdisciplinary program in Ecology and Oceanography for grades six through eight. Numerous student projects are suggested in the outline and the course requirements and the project system are explained. (MA)

  1. Supernova Cosmology Project

    Science.gov Websites

    , 2014 The Supernova Cosmology Project and High-Z Team share the 2015 Breakthrough Prize in Fundamental Perlmutter, leader of the international Supernova Cosmology Project, and principal investigator of the

  2. Project management practice and its effects on project success in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  3. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  4. Native American Projects and Projects Recruiting Native Americans: FY 91, FY 92, FY 93.

    ERIC Educational Resources Information Center

    Baker, Betty C.

    This document presents descriptions of projects supported by the U.S. Department of Education's Division of Personnel Preparation which prepare Native Americans to serve students with disabilities. Two types of projects are included in this listing: Native American Projects (funded for fiscal years 1991, 1992, and 1993) and Projects Recruiting…

  5. Project LITE Spectroscopy

    NASA Astrophysics Data System (ADS)

    Weeks, E.; Brecher, K.; Carr, P.; Garik, P.

    2003-12-01

    Spectroscopy is one of the most important tools used by astronomers to disentangle information about the universe. However, it is one of the most challenging subjects in undergraduate astronomy courses. Among the most difficult concepts for students to master are Kirchhoff's laws, blackbody radiation, the Stefan-Boltzmann law, Wien's law, the nature and causes of emission and absorption lines, and the relation of spectra to the underlying astronomical and physical processes producing them. Students often seem baffled by the connection between a spectrum seen visually as a color band and the same spectrum plotted graphically as intensity versus wavelength or frequency. Project LITE (Light Inquiry Through Experiments) is a software, curriculum, and materials development project at Boston University. As part of the project, we are currently developing a suite of spectroscopic tools for astronomy education. We are also assessing their effectiveness in improving conceptual understanding of spectroscopic phenomena by astronomy students at the undergraduate level. The spectroscopy component of Project LITE includes take-home laboratory materials and experiments, which are integrated with web-based software. We have also developed a novel quantitative handheld binocular spectrometer (patent pending). Here we present an overview of the Project LITE homelab kits and curriculum, the Spectrum Explorer, and the Project LITE spectrometer. The homelab experiments and the Spectrum Explorer have been tested with students in a non-science majors introductory astronomy course as well as in a School of Education course for prospective elementary school science teachers. We present preliminary results of pre- and post-instruction surveys of student understanding of various spectral properties of light both from students who used the homelab activities and the Spectrum Explorer and those who did not. The Spectrum Explorer (along with many other applets about both the physical and

  6. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  7. The Alzheimer's Project

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  8. Project development process.

    DOT National Transportation Integrated Search

    2007-08-01

    The following chapter explains the purpose of this document, outlines the essential elements involved in : the Project Development Process, describes the differences in the three main project classifications, and : provides the necessary background i...

  9. Project resource reallocation algorithm

    NASA Technical Reports Server (NTRS)

    Myers, J. E.

    1981-01-01

    A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

  10. THE ATLANTA SUPERSITE PROJECT

    EPA Science Inventory

    The Atlanta Supersites project is the first of two Supersites projects to be established during Phase I of EPA's Supersites Program; Phase 11 is being established through a Request for Assistance. The other initial project is in Fresno, California. The Supersites Program is par...

  11. Library Digitisation Project Management.

    ERIC Educational Resources Information Center

    Middleton, Michael

    Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…

  12. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  13. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues.

  14. Forest Residues Bundling Project

    Treesearch

    U.S. Forest Service

    2007-01-01

    During the summer of 2003, the U.S. Forest Service conducted an evaluation of biomass bundling for forest residue extraction. This CD provides a report of the project results, a video documentary project record, and a collection of images from the project. Additional information is available at:

  15. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  16. CHP Project Development

    EPA Pesticide Factsheets

    Access information and tools to support the CHP project development process, including identifying if your facility is a good fit for CHP, the steps involved with CHP project development, and policies and incentives supportive of CHP.

  17. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    NASA Astrophysics Data System (ADS)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  18. Subcollicular projections to the auditory thalamus and collateral projections to the inferior colliculus.

    PubMed

    Schofield, Brett R; Mellott, Jeffrey G; Motts, Susan D

    2014-01-01

    Experiments in several species have identified direct projections to the medial geniculate nucleus (MG) from cells in subcollicular auditory nuclei. Moreover, many cochlear nucleus cells that project to the MG send collateral projections to the inferior colliculus (IC) (Schofield et al., 2014). We conducted three experiments to characterize projections to the MG from the superior olivary and the lateral lemniscal regions in guinea pigs. For experiment 1, we made large injections of retrograde tracer into the MG. Labeled cells were most numerous in the superior paraolivary nucleus, ventral nucleus of the trapezoid body, lateral superior olivary nucleus, ventral nucleus of the lateral lemniscus, ventrolateral tegmental nucleus, paralemniscal region and sagulum. Additional sources include other periolivary nuclei and the medial superior olivary nucleus. The projections are bilateral with an ipsilateral dominance (66%). For experiment 2, we injected tracer into individual MG subdivisions. The results show that the subcollicular projections terminate primarily in the medial MG, with the dorsal MG a secondary target. The variety of projecting nuclei suggest a range of functions, including monaural and binaural aspects of hearing. These direct projections could provide the thalamus with some of the earliest (i.e., fastest) information regarding acoustic stimuli. For experiment 3, we made large injections of different retrograde tracers into one MG and the homolateral IC to identify cells that project to both targets. Such cells were numerous and distributed across many of the nuclei listed above, mostly ipsilateral to the injections. The prominence of the collateral projections suggests that the same information is delivered to both the IC and the MG, or perhaps that a common signal is being delivered as a preparatory indicator or temporal reference point. The results are discussed from functional and evolutionary perspectives.

  19. Subcollicular projections to the auditory thalamus and collateral projections to the inferior colliculus

    PubMed Central

    Schofield, Brett R.; Mellott, Jeffrey G.; Motts, Susan D.

    2014-01-01

    Experiments in several species have identified direct projections to the medial geniculate nucleus (MG) from cells in subcollicular auditory nuclei. Moreover, many cochlear nucleus cells that project to the MG send collateral projections to the inferior colliculus (IC) (Schofield et al., 2014). We conducted three experiments to characterize projections to the MG from the superior olivary and the lateral lemniscal regions in guinea pigs. For experiment 1, we made large injections of retrograde tracer into the MG. Labeled cells were most numerous in the superior paraolivary nucleus, ventral nucleus of the trapezoid body, lateral superior olivary nucleus, ventral nucleus of the lateral lemniscus, ventrolateral tegmental nucleus, paralemniscal region and sagulum. Additional sources include other periolivary nuclei and the medial superior olivary nucleus. The projections are bilateral with an ipsilateral dominance (66%). For experiment 2, we injected tracer into individual MG subdivisions. The results show that the subcollicular projections terminate primarily in the medial MG, with the dorsal MG a secondary target. The variety of projecting nuclei suggest a range of functions, including monaural and binaural aspects of hearing. These direct projections could provide the thalamus with some of the earliest (i.e., fastest) information regarding acoustic stimuli. For experiment 3, we made large injections of different retrograde tracers into one MG and the homolateral IC to identify cells that project to both targets. Such cells were numerous and distributed across many of the nuclei listed above, mostly ipsilateral to the injections. The prominence of the collateral projections suggests that the same information is delivered to both the IC and the MG, or perhaps that a common signal is being delivered as a preparatory indicator or temporal reference point. The results are discussed from functional and evolutionary perspectives. PMID:25100950

  20. Visible Human Project

    MedlinePlus

    ... used for teaching, modeling radiation absorption and therapy, equipment design, surgical simulation, and simulation of diagnostic procedures, ….” ... Project ® " by Michael J. Ackerman, Ph.D. Projects Based on the Visible Human Data Set Applications for ...

  1. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lear, Jon; Bennett, Carlon; Lear, Dan

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator -more » Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.« less

  2. Science project

    NASA Image and Video Library

    2012-08-23

    Once tethered in place in Gulf Coast waters, a DRIFTER sensor device is able to transmit valuable information about water temperature and conductivity. The Applied Science and Technology Project Office at Stennis Space Center designed the DRIFTER as an inexpensive device that can be used for science projects in local schools. Two of the devices, deployed in coastal waters, survived Hurricane Isaac, continuing to transmit valuable data regarding the storm.

  3. Humane Education Projects Handbook.

    ERIC Educational Resources Information Center

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  4. Concentrating Solar Power Projects by Project Name | Concentrating Solar

    Science.gov Websites

    Tower Plant Gujarat Solar One Gulang 100MW Thermal Oil Parabolic Trough project Guzmán Hami 50 MW CSP ¼lich Solar Tower Kathu Solar Park KaXu Solar One Khi Solar One Kimberlina Solar Thermal Power Plant Solar Plant MINOS Mojave Solar Project Morón National Solar Thermal Power Facility Nevada Solar One

  5. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate conveyance. Project-related planning costs outlined in § 64.9(a)(3), may be incurred prior to...) Construction costs associated with developing the right-of-way for recreation use. (3) Project-related planning required for the acquisition, development and use of the abandoned rights-of-way including master planning...

  6. Guidelines for CSM project development.

    PubMed

    1983-01-01

    This document summarizes guidelines for contraceptive social marketing project development prepared by the International Contraceptive Social Marketing Project (ICSMP) as an aid to consultants and technical assistance contractors. The ICSMP has developed a checklist to guide planning in 4 major areas: 1) project organization and management structure, 2) target market, 3) product line, and 4) pricing strategy and project costs. A clear statement of project objectives is essential, and these objectives must be internally consistent so that strategies to accomplish them can be unified. The position of each governmental entity and sponsoring agency involved in the social marketing project must be clearly understood. Projects receiving US government funds must have a mechanism for financial and programmatic reporting and accountability. Thorough knowledge of commercial rules and regulations in a country is necessary for planning. To ascertain whether the necessary resources are available, it is necessary to examine the existing marketing infrastructure in terms of distribution, advertising, market research, and packagaing capabilities. The target market should be specified in quantifiable terms; in addition, a consumer profile that defines the overall demographics of the country, the family planning environment, and potential social marketing consumers should be developed. The couple years of protection projection can be translated into the percentage of the target market that the project expects to capture. It is necessary to price products early in project development in order to assess program costs. Revenue projections should be based on previous calculations of couple year of protection goals, product line, product price, and price structure. Each element of the advertsing budget should be justifiable in terms of project objectives. Finally, positions and anticpated salaries for staff should be specified through the 1st 3 years of project implementation.

  7. Tedese Project

    NASA Astrophysics Data System (ADS)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  8. Michigan: Healthy Homes-Healthy Business Project (A Former EPA CARE Project)

    EPA Pesticide Factsheets

    The Healthy Homes-Healthy Business project is a recipient of a Level II CARE cooperative agreement. The communities of focus for this CARE level II project are the adjacent neighborhoods of Southwest Detroit and South Dearborn.

  9. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  10. Project coalitions in healthcare construction projects and the application of real options: an exploratory survey.

    PubMed

    van Reedt Dortland, Maartje; Dewulf, Geert; Voordijk, Hans

    2013-01-01

    Exploring the impact of the type of project coalition on types of flexibility by analyzing considered and exercised flexibilities in separated and integrated project coalitions in the design and construction phase and the operations and maintenance phase of a healthcare construction project. Flexibility in healthcare construction projects is increasingly needed in order to deal with growing uncertainties. Until now, little research has been carried out on how and to what extent flexibility is incorporated in different types of project coalitions chosen by healthcare organizations. An exploratory survey was conducted among health organizations in both cure and care. Questions were asked on the position of the real estate department within the organization, the type of project coalitions chosen and the rationale behind this choice, and the extent to which flexibility in terms of a real option was considered and to what extent it had been exercised in a project coalition. Integrated project coalitions pay more attention to flexibility in advance in both the process and the product, but exercise them to a lesser extent than separated project coalitions. The economic feasibility of real options is higher in integrated project coalitions. The study shows that real options thinking is already incorporated in real estate management of healthcare organizations, although more flexibility is considered in advance of the project than is actually realized during and after construction. Built environment, construction, decision making, hospitals, planning.

  11. Project-Based Module Development.

    ERIC Educational Resources Information Center

    Meel, R. M. van

    A project management design for modularizing higher education at open universities was developed and tested. Literature in the fields of project management and development of modular curriculum materials was reviewed and used as a basis for developing a project-based approach to the process of developing modules for self-instruction. According to…

  12. Lake Charles CCS Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leib, Thomas; Cole, Dan

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor

  13. 13 CFR 308.1 - Use of funds in Projects constructed under projected cost.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...

  14. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  15. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  16. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  17. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  18. The Eggen Card Project

    NASA Astrophysics Data System (ADS)

    Silvis, G.

    2014-06-01

    (Abstract only) Olin Eggen, noted astronomer (1919-1998), left to us all his raw observation records recorded on 3x5 cards. This project is to make all this data available as an online resource. History and progress of the project will be presented. Project details available at: https://sites.google.com/site/eggencards/home.

  19. Project Pride Evaluation Report.

    ERIC Educational Resources Information Center

    Jennewein, Marilyn; And Others

    Project PRIDE (Probe, Research, Inquire, Discover, and Evaluate) is evaluated in this report to provide data to be used as a learning tool for project staff and student participants. Major objectives of the project are to provide an inter-disciplinary, objective approach to the study of the American heritage, and to incorporate methods and…

  20. Panoramic projection avionics displays

    NASA Astrophysics Data System (ADS)

    Kalmanash, Michael H.

    2003-09-01

    Avionics projection displays are entering production in advanced tactical aircraft. Early adopters of this technology in the avionics community used projection displays to replace or upgrade earlier units incorporating direct-view CRT or AMLCD devices. Typical motivation for these upgrades were the alleviation of performance, cost and display device availability concerns. In these systems, the upgraded (projection) displays were one-for-one form / fit replacements for the earlier units. As projection technology has matured, this situation has begun to evolve. The Lockheed-Martin F-35 is the first program in which the cockpit has been specifically designed to take advantage of one of the more unique capabilities of rear projection display technology, namely the ability to replace multiple small screens with a single large conformal viewing surface in the form of a panoramic display. Other programs are expected to follow, since the panoramic formats enable increased mission effectiveness, reduced cost and greater information transfer to the pilot. Some of the advantages and technical challenges associated with panoramic projection displays for avionics applications are described below.

  1. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giordano, Anthony P.

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  2. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  3. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  4. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  5. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  6. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  7. Single Parent/Homemaker Project Reports.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort. Office of Vocational Education.

    Annual reports, project descriptions, and various other materials are provided for 35 projects. Most of the projects focus on homemaking; some are on sex equity. Project titles include: Single Parent/Adult Homemaker Reentry Program (Ashland Community College); Career Awareness Class for the Single Parent and/or Homemaker (Cumberland Valley Health…

  8. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  9. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  10. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  11. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  12. The Sungrazer Citizen Science Project

    NASA Astrophysics Data System (ADS)

    Battams, K.

    2016-12-01

    The NASA-funded Sungrazer Project is one of the oldest and most successful Citizen Science projects, having more than doubled the number of officially designated comets since it became public in 2002. The Sungrazer Project has enabled the discovery of more than 3,100 previously unknown near-Sun and Sungrazing comets in images returned by the joint ESA-NASA Solar and Heliospheric Observatory (SOHO), which was launched in 1995, and the NASA Solar Terrestrial Relations Observatories (STEREO), launched in 2006. The Sungrazer Project offers a centralized web site for amateur astronomers ("comet hunters") to report potential comets in SOHO and STEREO data, which the Project PI then confirms/rejects. It is then the task of the Project PI to perform precise astrometric measurements of all new comets, and supply the resulting data to the Minor Planet Center for official orbit determinations and designation. Almost 100 individuals from all over the world have discovered comets via the Project, with successful participants as young as 13-years old. In this talk I will discuss the history of the project, report the current discovery statistics, and highlight a few of the major discoveries enabled by the Project. I will also discuss the logistic of the program, participation requirements, day-to-day operations, and outreach efforts. Finally I will present an outlook for the project with respect to future space-based heliophysics missions.

  13. Project S'COOL

    NASA Technical Reports Server (NTRS)

    Green, Carolyn J.; Chambers, Lin H.

    1998-01-01

    The Students Clouds Observations On-Line or S'COOL project was piloted in 1997. It was created with the idea of using students to serve as one component of the validation for the Clouds and the Earth's Radiant Energy System (CERES) instrument which was launched with the Tropical Rainfall Measuring Mission (TRMM) in November, 1997. As part of NASA's Earth Science Enterprise CERES is interested in the role clouds play in regulating our climate. Over thirty schools became involved in the initial thrust of the project. The CERES instrument detects the location of clouds and identifies their physical properties. S'COOL students coordinate their ground truth observations with the exact overpass of the satellite at their location. Their findings regarding cloud type, height, fraction and opacity as well as surface conditions are then reported to the NASA Langley Distributed Active Archive Center (DAAC). The data is then accessible to both the CERES team for validation and to schools for educational application via the Internet. By March of 1998 ninety-three schools, in nine countries had enrolled in the S'COOL project. Joining the United States participants were from schools in Australia, Canada, France, Germany, Norway, Spain, Sweden, and Switzerland. The project is gradually becoming the global project envisioned by the project s creators. As students obtain the requested data useful for the scientists, it was hoped that students with guidance from their instructors would have opportunity and motivation to learn more about clouds and atmospheric science as well.

  14. Managemant of NASA's major projects

    NASA Technical Reports Server (NTRS)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  15. 20% Research & Design Science Project

    NASA Astrophysics Data System (ADS)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  16. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  17. Submittal for 2003 Project of the Year K Basins Fuel Transfer System Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GERBER, M.S.

    2003-01-29

    Fluor Hanford, Inc. is pleased to submit the K Basins Fuel Transfer System (FTS) for consideration by the Project Management Institute as Project of the Year for 2003. The FTS involved installing a unique, unproven system in an inhospitable and deteriorating radiological and hazardous environment, under very stringent requirements and within an extremely condensed schedule, just 19 months, from authorization to full operations. The FTS, therefore, is an excellent example of effective project management, and the dynamic involvement of an integrated team representing a broad spectrum of personnel, disciplines, and services. The FTS is an integral and critical part ofmore » a larger project at Hanford -the Spent Nuclear Fuel Project (SNF). The mission of the SNF Project is to relocate used, or spent, nuclear fuel to safe interim storage, permanently dispose of radioactive debris in the K-Basins, and deactivate all related facilities and prepare them for demolition. Today, the FTS is being used to remove highly radioactive nuclear fuel from an aging, and potentially unstable storage in underground pools of water--the K-Basins--and safely transport it to a processing area to be cleaned, dried and sent to safe storage. The role the FTS plays in successfully completing the mission of the SNF Project is concrete evidence of the intrinsic value of project management and a testimonial to the innovation, ingenuity, and teamwork of many--from workers to management and subcontractors, and regulators to stakeholders. It's a true success story and one that will have a happy ending, safely eliminating the risk of potentially contaminating one of Washington state's most valuable natural resources, the Columbia River. This nomination is dedicated to that Project Team.« less

  18. Health Project Management. A Manual of Procedures for Formulating and Implementing Health Projects.

    ERIC Educational Resources Information Center

    Bainbridge, J.; Sapirie, S.

    The manual presents 16 main steps for health project management, from project formulation through termination. The manual defines a health project as a temporary intensive effort to set up and put into operation a new or revised service that will result in the reduction of specific health or health-related problems. (Typical examples include the…

  19. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  20. An Empirical Investigation of Pre-Project Partnering Activities on Project Performance in the Software Industry

    ERIC Educational Resources Information Center

    Proffitt, Curtis K.

    2012-01-01

    Project failure remains a challenge within the software development field especially during the early stages of the IT project development. Despite the herculean efforts by project managers and organizations to identify and offset problems, projects remain plagued with issues. If these challenges are not mitigated, to a successful degree,…

  1. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  2. The Interdisciplinary Generalist Curriculum Project: A National Medical School Demonstration Project.

    ERIC Educational Resources Information Center

    Kahn, Norman B., Jr.; And Others

    1995-01-01

    The Interdisciplinary Generalist Curriculum Project was developed to encourage schools of medicine and colleges of osteopathic medicine to implement interdisciplinary generalist curricula in the preclinical years. Five sites were competitively established as demonstration projects, and rigorous attention to creating and maintaining an…

  3. The TULIP Project.

    ERIC Educational Resources Information Center

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  4. BI Project Success

    ERIC Educational Resources Information Center

    Tracey, Graham; Riha, James

    2009-01-01

    Managing business intelligence (BI) projects in higher education is a formidable responsibility that challenges even the most experienced technical project managers. Data source dependencies, uncertain data quality, changing information requirements, and urgency for actionable information are but a few examples among the multitude of challenges.…

  5. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  6. IPAD project overview

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  7. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  8. JPL Year 2000 Project. A Project Manager's Observations: Y2k

    NASA Technical Reports Server (NTRS)

    Mathison, Richard P. (Technical Monitor)

    1999-01-01

    This paper presents observations from a project manager on the Y2K problem. The topics include: 1) Agenda: 2) Scope; 3) Project Organization; 4) The Fixes; 5) The Toughest Part; 6) Validation versus Time; and 7) Information Sources. This paper is in viewgraph form.

  9. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  10. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11...

  11. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2012-10-01 2012-10-01 false Covered projects. 633.11 Section 633.11...

  12. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2013-10-01 2013-10-01 false Covered projects. 633.11 Section 633.11...

  13. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2014-10-01 2014-10-01 false Covered projects. 633.11 Section 633.11...

  14. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2011-10-01 2011-10-01 false Covered projects. 633.11 Section 633.11...

  15. Small Projects First

    ERIC Educational Resources Information Center

    Shang-Kuei, Chen

    1975-01-01

    For thousands of years China has been troubled by droughts and floods. In the past 25 years, the country has worked to alleviate these problems. Numerous water conservation projects requiring the communal efforts of the people have been carried out. Record grain crops have resulted from these projects. (MA)

  16. The Billboard Project

    ERIC Educational Resources Information Center

    Weaver, Victoria

    2005-01-01

    Since 1997, the author coordinated a large-scale billboard project. Coordinated to coincide with the National Art Education Association's celebration of Youth Art Month, strong commitments from faculty, students, administrators, public-relations liaisons, local press, radio, TV, and community businesses have made this project a success. The first…

  17. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  18. Brazilian Eratosthenes Project

    NASA Astrophysics Data System (ADS)

    Langhi, R.; Vilaça, J.

    2014-10-01

    The objective of Brazilian Eratosthenes Project is the development and application of teaching training actions according the ``docent autonomy" concept to basic Astronomy Education. Argentina coordinates the project in South America, but Brazil works in this project since 2010 with the theme ``Projeto Eratóstenes Brasil" in the homepage: http://sites.google.com/site/projetoerato. Two schools measure a sticks shadow and communicate their results. After, they calculate an average radius of Earth. The stick (gnomon) should stay in vertical position in the leveled ground. Since 2010, the project received hundreds of Brazilian schools with different experiments that were constructed with autonomy, because our site doesn't show some itinerary pre-ready to elaborate the experiments. To collect data for our research, we will use interviews via Skype with the teachers. These data are useful to researches about Science Education area and the Teaching Formation. Teaching professional practice could change and we see modifications in the teachers work, what depends of their realities and context. This project intents to respect the docent autonomy. This autonomy to responsible modifications during continued formation is called ``activist formative model" according Langhi & Nardi (Educação em Astronomia: repensando a formação de professores. São Paulo: Escrituras Editora, 2012). This project discusses about researches in Astronomy Education - still extreme rare in Brazil, when we compare with other areas in Science Education. We believe that actions like this could motivate the students to learn more Astronomy. Furthermore, this national action can be a rich source of data to investigations about teaching formation and scientific divulgation.

  19. Final project report for NEET pulsed ion beam project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kucheyev, S. O.

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurementmore » of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.« less

  20. The project scientist's role in scientific spacecraft project management. M.S. Thesis - George Washington Univ.

    NASA Technical Reports Server (NTRS)

    Eller, E. L.

    1976-01-01

    The project scientists is in a position which rates very high in terms of behavioral study recommendations. His influence over objectives is generally considered to be important. He is highly autonomous in a moderately coordinated environment. He has diverse managerial and technical functions and the performance of these functions require him to grow beyond his role as an experimenter. However, the position within the line organization for those interviewed is also very stimulating, rating almost as high by the same criteria. The role of project scientist may not be the dominant means of professional growth for the experienced scientific investigators. The influence which the project scientist exerts on the project and the stimulation of that position for him are determined largely by his position outside the defined project scientist role. The role of the project scientist is changing because the environment of those who become project scientists is changing.

  1. [The research project: financing and management].

    PubMed

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  2. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  3. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  4. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  5. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  6. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  7. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  8. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  9. The Anthological Project.

    ERIC Educational Resources Information Center

    Johns, Trevor

    1969-01-01

    Anthological projects, in which students gather and produce material for a group product (e.g., class newspapers, magazines, radio shows), can reawaken students' interest in English and benefit all ability levels. The novelty of the projects and the promise of tangible results initially motivates the students, and their involvement and the…

  10. Family Reunification Project.

    ERIC Educational Resources Information Center

    Administration for Children, Youth, and Families (DHHS), Washington, DC.

    Utah's Department of Human Services' Family Reunification Project was initiated to demonstrate that intensive, time-limited, home-based services would enable children in foster care to return to their natural families more rapidly than regular foster care management permits. The following steps were taken in project development: (1) sites were…

  11. Setting up crowd science projects.

    PubMed

    Scheliga, Kaja; Friesike, Sascha; Puschmann, Cornelius; Fecher, Benedikt

    2016-11-29

    Crowd science is scientific research that is conducted with the participation of volunteers who are not professional scientists. Thanks to the Internet and online platforms, project initiators can draw on a potentially large number of volunteers. This crowd can be involved to support data-rich or labour-intensive projects that would otherwise be unfeasible. So far, research on crowd science has mainly focused on analysing individual crowd science projects. In our research, we focus on the perspective of project initiators and explore how crowd science projects are set up. Based on multiple case study research, we discuss the objectives of crowd science projects and the strategies of their initiators for accessing volunteers. We also categorise the tasks allocated to volunteers and reflect on the issue of quality assurance as well as feedback mechanisms. With this article, we contribute to a better understanding of how crowd science projects are set up and how volunteers can contribute to science. We suggest that our findings are of practical relevance for initiators of crowd science projects, for science communication as well as for informed science policy making. © The Author(s) 2016.

  12. Computer-assisted map projection research

    USGS Publications Warehouse

    Snyder, John Parr

    1985-01-01

    Computers have opened up areas of map projection research which were previously too complicated to utilize, for example, using a least-squares fit to a very large number of points. One application has been in the efficient transfer of data between maps on different projections. While the transfer of moderate amounts of data is satisfactorily accomplished using the analytical map projection formulas, polynomials are more efficient for massive transfers. Suitable coefficients for the polynomials may be determined more easily for general cases using least squares instead of Taylor series. A second area of research is in the determination of a map projection fitting an unlabeled map, so that accurate data transfer can take place. The computer can test one projection after another, and include iteration where required. A third area is in the use of least squares to fit a map projection with optimum parameters to the region being mapped, so that distortion is minimized. This can be accomplished for standard conformal, equalarea, or other types of projections. Even less distortion can result if complex transformations of conformal projections are utilized. This bulletin describes several recent applications of these principles, as well as historical usage and background.

  13. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    ERIC Educational Resources Information Center

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  14. Sun light European Project

    NASA Astrophysics Data System (ADS)

    Soubielle, Marie-Laure

    2015-04-01

    2015 has been declared the year of light. Sunlight plays a major role in the world. From the sunbeams that heat our planet and feed our plants to the optical analysis of the sun or the modern use of sun particles in technologies, sunlight is everywhere and it is vital. This project aims to understand better the light of the Sun in a variety of fields. The experiments are carried out by students aged 15 to 20 in order to share their discoveries with Italian students from primary and secondary schools. The experiments will also be presented to a group of Danish students visiting our school in January. All experiments are carried out in English and involve teams of teachers. This project is 3 folds: part 1: Biological project = what are the mechanisms of photosynthesis? part 2: Optical project= what are the components of sunlight and how to use it? part 3: Technical project= how to use the energy of sunlight for modern devices? Photosynthesis project Biology and English Context:Photosynthesis is a process used by plants and other organisms to convert light energy, normally from the Sun, into chemical energy that can later fuel the organisms' activities. This chemical energy is stored in molecules which are synthesized from carbon dioxide and water. In most cases, oxygen is released as a waste product. Most plants perform photosynthesis. Photosynthesis maintains atmospheric oxygen levels and supplies all of the organic compounds and most of the energy necessary for life on Earth. Outcome: Our project consists in understanding the various steps of photosynthesis. Students will shoot a DVD of the experiments presenting the equipments required, the steps of the experiments and the results they have obtained for a better understanding of photosynthesis Digital pen project Electricity, Optics and English Context: Sunlight is a complex source of light based on white light that can be decomposed to explain light radiations or colours. This light is a precious source to create

  15. Developing Government Renewable Energy Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewablemore » projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.« less

  16. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  17. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...

  18. Geothermal Project Consulting | Geothermal Technologies | NREL

    Science.gov Websites

    Geothermal Project Consulting Geothermal Project Consulting When consulting on projects, NREL focuses on identifying specific barriers or challenges that are likely to impact geothermal project , validation, and deployment of geothermal technologies Assess and evaluate geothermal R&D projects

  19. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  20. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  1. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  2. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  3. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...

  4. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  5. Share Your Solar Project Experience

    EPA Pesticide Factsheets

    The Local Government Solar Project Portal's Share Your Solar Project Experience page includes details on how municipalities can be listed in the Portal and update EPA with their solar project development achievements and progress.

  6. The Astronomy Genealogy Project

    NASA Astrophysics Data System (ADS)

    Tenn, Joseph S.

    2014-01-01

    The Astronomy Genealogy Project, to be known as AstroGen, will list as many as possible of the world's astronomers with their academic parents (aka thesis advisors) and enable the reader to trace both academic ancestors and descendants. It will be very similar to the highly successful Mathematics Genealogy Project (MGP), available at http://genealogy.math.ndsu.nodak.edu. The MGP, which has been in operation since 1996, now contains the names of about 170,000 "mathematicians." These include many physicists and astronomers, as well as practitioners of related sciences. Mitchel Keller, the director of the MGP, has generously shared the software used in that project, and the American Astronomical Society (AAS) will host AstroGen, a project of the Historical Astronomy Division, on its website. We expect to start seeking entries soon, depending on the availability of computational assistance from the AAS IT department. We are seeking volunteers to help run the project. If you are interested, please contact me at joe.tenn@sonoma.edu.

  7. The Rural Outreach Project

    NASA Technical Reports Server (NTRS)

    Coleman, Clarence D.

    2000-01-01

    The Rural Outreach Project was designed to increase the diversity of NASA's workforce by: 1) Conducting educational research designed to investigate the most effective strategies for expanding innovative, NASA-sponsored pre-college programs into rural areas; 2) Field-testing identified rural intervention strategies; 3) Implementing expanded NASA educational programs to include 300 rural students who are disabled, female and/or minority; and 4) Disseminating project strategies. The Project was a partnership that included NASA Langley Research Center's Office of Education, Norfolk State University, Cooperative Hampton Roads Organizations for Minorities in Engineering (CHROME) and Paul D. Camp Community College. There were four goals and activities identified for this project; 1) Ascertain effective strategies for expanding successful NASA-sponsored urban-based, pre-college programs into rural settings; 2) Field test identified rural intervention strategies; 3) Publish or disseminate two reports, concerning project research and activities at a national conference; 4) Provide educational outreach to 300, previously underserved, rural students who are disabled, female and /or minority.

  8. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  9. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  10. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  11. Life Skills Project

    ERIC Educational Resources Information Center

    Jalazo, Michael D.

    2005-01-01

    In this article, the author, Program Administrator of the Pinellas County Sheriff's Office (PCSO) Project New Attitudes in Clearwater, Florida, describes the project. The PCSO is the country's largest law enforcement agency, providing law enforcement services to over 400,000 of its residents who reside in the unincorporated areas of the county and…

  12. Computer Assets Recovery Project

    NASA Technical Reports Server (NTRS)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  13. Solar Project Development Pathway & Resources

    EPA Pesticide Factsheets

    The Local Government Solar Project Portal's Solar Project Development Pathway and Resources page details the major steps along the project development pathway and each step includes resources and tools to assist you with that step.

  14. The Olive Project: An Oral History Project in Multiple Modes

    ERIC Educational Resources Information Center

    Anderson, Erin R.

    2011-01-01

    This project is devoted to the memory of my grandmother, Olive. It is at once her life story and not a story at all. In a sense it represents the product of an intimate family collaboration and of the close journey we shared in collecting and preserving her oral history. But this project is not a product, nor is it entirely about my grandma, about…

  15. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  16. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  17. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  18. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  19. 34 CFR 461.33 - What are special experimental demonstration projects and teacher training projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are special experimental demonstration projects...? § 461.33 What are special experimental demonstration projects and teacher training projects? (a) In... personnel in programs designed to carry out the purposes of the Act; and (ii) Training professional teachers...

  20. Spiral and Project-Based Learning with Peer Assessment in a Computer Science Project Management Course

    NASA Astrophysics Data System (ADS)

    Jaime, Arturo; Blanco, José Miguel; Domínguez, César; Sánchez, Ana; Heras, Jónathan; Usandizaga, Imanol

    2016-06-01

    Different learning methods such as project-based learning, spiral learning and peer assessment have been implemented in science disciplines with different outcomes. This paper presents a proposal for a project management course in the context of a computer science degree. Our proposal combines three well-known methods: project-based learning, spiral learning and peer assessment. Namely, the course is articulated during a semester through the structured (progressive and incremental) development of a sequence of four projects, whose duration, scope and difficulty of management increase as the student gains theoretical and instrumental knowledge related to planning, monitoring and controlling projects. Moreover, the proposal is complemented using peer assessment. The proposal has already been implemented and validated for the last 3 years in two different universities. In the first year, project-based learning and spiral learning methods were combined. Such a combination was also employed in the other 2 years; but additionally, students had the opportunity to assess projects developed by university partners and by students of the other university. A total of 154 students have participated in the study. We obtain a gain in the quality of the subsequently projects derived from the spiral project-based learning. Moreover, this gain is significantly bigger when peer assessment is introduced. In addition, high-performance students take advantage of peer assessment from the first moment, whereas the improvement in poor-performance students is delayed.

  1. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    NASA Astrophysics Data System (ADS)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  2. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Randy M; Gross, Ian G; Smith, Cyrus M

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulnessmore » of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal

  3. Climate projections FAQ

    Treesearch

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  4. The Nordwrite Project.

    ERIC Educational Resources Information Center

    Evensen, Lars, Sigfred

    A planned 3-year joint project of the Nordic research council for the humanities that focuses on writing development in school-age children is described. Four Nordic countries are involved in the project: Finland, Sweden, Norway, and Denmark. In the study, discourse-level performance analyses of student writing in English as a Second Language are…

  5. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  6. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  7. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  8. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  9. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  10. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  11. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  12. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  13. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  14. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  15. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  16. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  17. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  18. [Administration of the "Healthy School" project].

    PubMed

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    The term of project management is commonly used to describe the work of a team that is handling a special program. In this type of management, a form of leadership which creates environment, enables fast movement of participants through different work phases achieving the common aims, is used [1-4]. The "Healthy School" Project, launched in almost all European countries, has been taking place in Yugoslavia since the end of 1991 [5]. The project developed within the country designed as a health promotion-education intervention study in primary schools. The network of 13 schools on 11 locations representing typical economic, cultural and social environments, was established to cover the country. Although the proposed methodological approach from WHO was followed [6], the specific situation in the country (economic crisis, break down of Yugoslav Federation, the war and international blockade) distated the particular modification. The management of the Healthy School Project in general, and in Yugoslavia particularly, is based upon project management structure (Scheme 1). The objective of this research was to assess the Healthy School project management in Yugoslavia, by measuring causal, intervening and output variables. In the process of assessing the management in general, three groups of criteria are commonly used: (a) causal (those that influence the course of developments in the Project), (b) intervening (representing the current condition of the internal state of the Project), and (c) output (that reflect the Project achievements). (a) For the purpose of this study the causal criteria were measured by analyzing the overall management strategy and the level of agreement in objectives of the Project itself, the Project Coordinators and main participants in the Project. (b) The intervening criteria used in this assessment were: the time spent on different project activities, the estimate of the severity of the problems in different aspects of project management

  19. The Eclipse Project

    NASA Technical Reports Server (NTRS)

    Tucker, Tom; Launius, Roger (Technical Monitor)

    2000-01-01

    The Eclipse Project by Tom Tucker provides a readable narrative and a number of documents that record an important flight research effort at NASA's Dryden Flight Research Center. Carried out by Kelly Space and Technology, Inc., in partnership with the Air Force and Dryden at Edwards Air Force Base in the Mojave Desert of California, this project tested and gathered data about a potential newer and less expensive way to launch satellites into space. Whether the new technology comes into actual use will depend on funding, market forces, and other factors at least partly beyond the control of the participants in the project. This is a familiar situation in the history of flight research.

  20. Spectrum Project

    NASA Image and Video Library

    2017-10-16

    Dr. Scott Shipley of Ascentech Enterprises makes an adjustment to the Spectrum unit. He is the project engineer for the effort working under the Engineering Services Contract at NASA's Kennedy Space Center. The device is being built for use aboard the International Space Station and is designed to expose different organisms to different color of fluorescent light while a camera records what's happening with time-laps imagery. Results from the Spectrum project will shed light on which living things are best suited for long-duration flights into deep space.

  1. Bézier B¯ projection

    NASA Astrophysics Data System (ADS)

    Miao, Di; Borden, Michael J.; Scott, Michael A.; Thomas, Derek C.

    2018-06-01

    In this paper we demonstrate the use of B\\'{e}zier projection to alleviate locking phenomena in structural mechanics applications of isogeometric analysis. Interpreting the well-known $\\bar{B}$ projection in two different ways we develop two formulations for locking problems in beams and nearly incompressible elastic solids. One formulation leads to a sparse symmetric symmetric system and the other leads to a sparse non-symmetric system. To demonstrate the utility of B\\'{e}zier projection for both geometry and material locking phenomena we focus on transverse shear locking in Timoshenko beams and volumetric locking in nearly compressible linear elasticity although the approach can be applied generally to other types of locking phenemona as well. B\\'{e}zier projection is a local projection technique with optimal approximation properties, which in many cases produces solutions that are comparable to global $L^2$ projection. In the context of $\\bar{B}$ methods, the use of B\\'ezier projection produces sparse stiffness matrices with only a slight increase in bandwidth when compared to standard displacement-based methods. Of particular importance is that the approach is applicable to any spline representation that can be written in B\\'ezier form like NURBS, T-splines, LR-splines, etc. We discuss in detail how to integrate this approach into an existing finite element framework with minimal disruption through the use of B\\'ezier extraction operators and a newly introduced dual basis for the B\\'{e}zierprojection operator. We then demonstrate the behavior of the two proposed formulations through several challenging benchmark problems.

  2. Assessing the costs attributed to project delay during project pre-construction stages

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  3. Assessing the costs attributed to project delay during project pre-construction stages.

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  4. Project Bibliographies: Tracking the Expansion of Knowledge Using JPL Project Publications

    ERIC Educational Resources Information Center

    Coppin, Ann

    2016-01-01

    The Jet Propulsion Laboratory (JPL) Library defines a project bibliography as a bibliography of publicly available publications relating to a specific JPL instrument or mission. These bibliographies may be used to share information between distant project team members, as part of the required Education and Public Outreach effort, or as part of…

  5. The Northeast Ghana Savannah Project--A Case Study in Project Design.

    ERIC Educational Resources Information Center

    Matlock, W. Gerald; Johnson, Jack D.

    This report examines a project design for land degradation problems in the northern and upper regions of Ghana. The project was jointly sponsored by the Ghana Council for Scientific and Industrial Research and the Agency for International Development. The council is responsible for coordinating the activities of 10 independent research institutes.…

  6. Null lifts and projective dynamics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cariglia, Marco, E-mail: marco@iceb.ufop.br

    2015-11-15

    We describe natural Hamiltonian systems using projective geometry. The null lift procedure endows the tangent bundle with a projective structure where the null Hamiltonian is identified with a projective conic and induces a Weyl geometry. Projective transformations generate a set of known and new dualities between Hamiltonian systems, as for example the phenomenon of coupling-constant metamorphosis. We conclude outlining how this construction can be extended to the quantum case for Eisenhart–Duval lifts.

  7. Probabilistic population projections with migration uncertainty

    PubMed Central

    Azose, Jonathan J.; Ševčíková, Hana; Raftery, Adrian E.

    2016-01-01

    We produce probabilistic projections of population for all countries based on probabilistic projections of fertility, mortality, and migration. We compare our projections to those from the United Nations’ Probabilistic Population Projections, which uses similar methods for fertility and mortality but deterministic migration projections. We find that uncertainty in migration projection is a substantial contributor to uncertainty in population projections for many countries. Prediction intervals for the populations of Northern America and Europe are over 70% wider, whereas prediction intervals for the populations of Africa, Asia, and the world as a whole are nearly unchanged. Out-of-sample validation shows that the model is reasonably well calibrated. PMID:27217571

  8. SDM Virtualness Project

    NASA Technical Reports Server (NTRS)

    Lim, Christopher Yit-Seong; Klein, Janice

    2004-01-01

    In the summer of 2001, NASA and Ford Motor Company co-sponsored a research project aimed at improving the education process and application of lessons learned through distant education. The System Design & Management Program (SDM) was used as a laboratory for improving distance learning capabilities. The research project was a follow up to previous research on globally dispersed teams.

  9. Projecting technological change

    Treesearch

    Kenneth E. Skog

    2007-01-01

    Improving efficiency in the use of both wood and nonwood inputs has characterized the US forest sector over the last 50 years. This chapter explores methods used to reflect this pattern of technological change and others in the Timber Assessment Projection System models. The development and use of three types of technology projection methods are explained: (1)...

  10. Project - line interaction implementing projects in JPL's Matrix

    NASA Technical Reports Server (NTRS)

    Baroff, Lynn E.

    2006-01-01

    Can programmatic and line organizations really work interdependently, to accomplish their work as a community? Does the matrix produce a culture in which individuals take personal responsibility for both immediate mission success and long-term growth? What is the secret to making a matrix enterprise actually work? This paper will consider those questions, and propose that developing an effective project-line partnership demands primary attention to personal interactions among people. Many potential problems can be addressed by careful definition of roles, responsibilities, and work processes for both parts of the matrix -- and by deliberate and clear communication between project and line organizations and individuals.

  11. Correlational Study of Project Managers' Competence Experience, Education, and Technology Experience on Project

    ERIC Educational Resources Information Center

    Hosford, Bryan

    2017-01-01

    Organizations continue to rely on information technology (IT) as a foundational element, yet poor IT project success continues to impact growth and innovation. Research into IT project success is widespread yet has focused on high-level project management attributes, not specific IT solutions. A review of the research literature revealed that the…

  12. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    ERIC Educational Resources Information Center

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  13. FIFRA Project Officers Manual

    EPA Pesticide Factsheets

    The FIFRA Project Officers Manual provides guidance to new as well as experienced project officers in the management of grants and cooperative agreements under the Federal Insecticide, Fungicide and Rodenticide Act.

  14. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  15. The Hubble Space Telescope's Student ERO Pilot Project: Implementing Formal and Informal Collaborative Projects

    NASA Astrophysics Data System (ADS)

    Eisenhamer, Bonnie; Ryer, H.; McCallister, D.; Taylor, J.; Bishop, M.

    2010-05-01

    The Hubble Space Telescope's Early Release Observations (EROs) were revealed to the public on September 9, 2009, and K-12 students and educators in six states across the country are joining in the celebration. Students and educators in Maryland, Ohio, New York, California, New Mexico, and Delaware have been invited to participate in the Hubble Space Telescope's Student ERO Pilot Project. This is an interdisciplinary project created by STScI's Office of Public Outreach in which students research the four ERO objects and create various types of projects. In recognition of their participation, the projects are displayed at host institutions in each state (museum, science center, school, planetarium or library) during a special public event for participating students, their families, and teachers. As part of its evaluation program, STScI's Office of Public Outreach has been conducting an evaluation of the project to determine the viability and potential of conducting large-scale, formal/informal collaborative projects in the future. This poster will highlight preliminary findings and share lessons learned.

  16. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  17. Burnet Project

    PubMed Central

    Masellis, A.; Atiyeh, B.

    2009-01-01

    Summary The BurNet project, a pilot project of the Eumedis initiative, has become true. The Eumedis (EUro MEDiterranean Information Society) initiative is part of the MEDA programme of the EU to develop the Information Society in the Mediterranean area. In the health care sector, the objective of Eumedis is: the deployment of network-based solutions to interconnect - using userfriendly and affordable solutions - the actors at all levels of the "health care system" of the Euro-Mediterranean region. The Bur Net project interconnects 17 Burn Centres (BC) in the Mediterranean Area through an information network both to standardize courses of action in the field of prevention, treatment, and functional and psychological rehabilitation of burn patients and to coordinate interactions between BC and emergency rooms in peripheral hospitals using training/information activities and telemedicine to optimize first aid provided to burn patients before referral to a BC. Shared procedure protocols for prevention and the care and rehabilitation of patients, both at individual and mass level, will help to create an international specialized database and a Webbased teleconsultation system. PMID:21991176

  18. Pedagogy of stereographic projection

    NASA Astrophysics Data System (ADS)

    Blenkinsop, Tom

    1999-05-01

    Three sorts of problem are encountered by students learning stereographic projection. Lack of familiarity with compass directions and with the specification of planar and linear orientations is the most fundamental problem. The second problem is one of poor visualisation which prohibits the correct understanding of the principles and practice of projection, although students can sometimes perform remarkably well on certain exercises without this understanding. A third problem is a lack of interest or appreciation of the usefulness of the technique. A solution to the first problem is to provide a thorough grounding in compass directions, and concepts of strike, dip, dip direction, plunge and plunge bearing immediately before teaching stereographic projection. Visual aids, such as a transparent hemisphere to represent half of the projection sphere, and a large stereonet, are helpful for visualisation. Estimation and sketching exercises help to develop an understanding of the geometry of projection. Computer-aided teaching and plotting is recommended after an introduction to manual techniques. Interest can be stimulated through the use of exercises based on real geological maps.

  19. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  20. THE EOS ART Projects: Six Art Projects Inspired by Earth Science

    NASA Astrophysics Data System (ADS)

    Kerlow, I.

    2015-12-01

    The six projects produced under the artists' residencies at the Earth Observatory of Singapore (EOS) were inspired by Earth science and by the human experience in naturally hazardous regions. These contemporary artworks were created within an interdisciplinary framework that fostered collaborations between artists and scientists. The EOS ART 2010-2013 was a pilot program that also facilitated the active engagement of regional artists with issues related to Earth science, sustainable societies, and innovative methods for science outreach. An interdisciplinary jury of art critics, curators and Earth scientists selected art projects proposed by regional artists, and funds were awarded to develop and realize the projects.The artworks-including installations, photographs, and video art-were showcased in the "Unearthed" public exhibit at the Singapore Art Museum from March to July of 2014. A 92-page catalog accompanied the show and public seminars about interdisciplinary connections complemented the event. This was a unique example of collaboration between scientific and artistic institutions in Southeast Asia.The presentation provides an overview of the motivations, process and accomplished results. The art projects include "Coastline" by Zhang Xiao (China), "Lupang" by Clara Balaguer and Carlos Casas (Philippines and Spain), "Sound of the Earth" by Chen Sai Hua Kuan (Singapore), "Sudden Nature" by Isaac Kerlow (Mexico/USA), "The Possibility of Knowing" by Robert Zhao Renhui (Singapore), and "When Need Moves the Earth" by Sutthirat Supaparinya (Thailand). http://art-science-media.com/the-eos-art-projects/

  1. Dissemination and Exploitation: Project Goals beyond Science

    NASA Astrophysics Data System (ADS)

    Hamann, Kristin; Reitz, Anja

    2017-04-01

    Dissemination and Exploitation are essential parts of public funded projects. In Horizon 2020 a plan for the exploitation and dissemination of results (PEDR) is a requirement. The plan should contain a clear vision on the objectives of the project in relation to actions for dissemination and potential exploitation of the project results. The actions follow the basic idea to spread the knowledge and results gathered within the project and face the challenge of how to bring the results into potentially relevant policy circle and how they impact the market. The plan follows the purpose to assess the impact of the project and to address various target groups who are interested in the project results. Simply put, dissemination concentrates on the transfer of knowledge and exploitation on the commercialization of the project. Beyond the question of the measurability of project`s impact, strategies within science marketing can serve purposes beyond internal and external communication. Accordingly, project managers are facing the challenge to implement a dissemination and exploitation strategy that ideally supports the identification of all partners with the project and matches the current discourse of the project`s content within the society, politics and economy. A consolidated plan might unite all projects partners under a central idea and supports the identification with the project beyond the individual research questions. Which applications, strategies and methods can be used to bring forward a PEDR that accompanies a project successfully and allows a comprehensive assessment of the project afterwards? Which hurdles might project managers experience in the dissemination process and which tasks should be fulfilled by the project manager?

  2. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    NASA Astrophysics Data System (ADS)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  3. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Kay L.; Singer, Mark R.

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles onmore » the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.« less

  4. Exe-Guard Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Rhett; Marshall, Tim; Chavez, Adrian

    The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirusmore » methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a

  5. Municipal Complex Solar Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sher, Jono; Toth, Andrew

    2015-02-12

    This project is a great benefit to the City of Perth Amboy by saving energy and savings costs. The project serves as a great example to city residents about the importance of renewable energy, energy conservation and other environmental topics. An electronic display in the City Hall shows how much energy was generated on that day, how much energy is saved, and environmental benefits. The project serves to educate people of environmental concerns and may spark the interest of individuals in other environmental topics. Hopefully, other residents will be encouraged to use solar energy. The project is also saving moneymore » for the City and its taxpayers. Anywhere we can save money means that residents can pay less in taxes and/or the City can provide improved services.« less

  6. Desktop Computing Integration Project

    NASA Technical Reports Server (NTRS)

    Tureman, Robert L., Jr.

    1992-01-01

    The Desktop Computing Integration Project for the Human Resources Management Division (HRMD) of LaRC was designed to help division personnel use personal computing resources to perform job tasks. The three goals of the project were to involve HRMD personnel in desktop computing, link mainframe data to desktop capabilities, and to estimate training needs for the division. The project resulted in increased usage of personal computers by Awards specialists, an increased awareness of LaRC resources to help perform tasks, and personal computer output that was used in presentation of information to center personnel. In addition, the necessary skills for HRMD personal computer users were identified. The Awards Office was chosen for the project because of the consistency of their data requests and the desire of employees in that area to use the personal computer.

  7. Cloudnet Project

    DOE Data Explorer

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  8. The MERMAID project

    NASA Technical Reports Server (NTRS)

    Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A

    1992-01-01

    The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

  9. The Iron Project

    NASA Technical Reports Server (NTRS)

    Pradhan, Anil K.

    2000-01-01

    Recent advances in theoretical atomic physics have enabled large-scale calculation of atomic parameters for a variety of atomic processes with high degree of precision. The development and application of these methods is the aim of the Iron Project. At present the primary focus is on collisional processes for all ions of iron, Fe I - FeXXVI, and other iron-peak elements; new work on radiative processes has also been initiated. Varied applications of the Iron Project work to X-ray astronomy are discussed, and more general applications to other spectral ranges are pointed out. The IP work forms the basis for more specialized projects such as the RmaX Project, and the work on photoionization/recombination, and aims to provide a comprehensive and self-consistent set of accurate collisional and radiative cross sections, and transition probabilities, within the framework of relativistic close coupling formulation using the Breit-Pauli R-Matrix method. An illustrative example is presented of how the IP data may be utilized in the formation of X-ray spectra of the K alpha complex at 6.7 keV from He-like Fe XXV.

  10. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  11. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  12. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and

  13. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  14. Machine translation project alternatives analysis

    NASA Technical Reports Server (NTRS)

    Bajis, Catherine J.; Bedford, Denise A. D.

    1993-01-01

    The Machine Translation Project consists of several components, two of which, the Project Plan and the Requirements Analysis, have already been delivered. The Project Plan details the overall rationale, objectives and time-table for the project as a whole. The Requirements Analysis compares a number of available machine translation systems, their capabilities, possible configurations, and costs. The Alternatives Analysis has resulted in a number of conclusions and recommendations to the NASA STI program concerning the acquisition of specific MT systems and related hardware and software.

  15. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  16. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  17. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  18. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  19. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  20. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  1. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  2. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    PubMed

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Reconstruction for limited-projection fluorescence molecular tomography based on projected restarted conjugate gradient normal residual.

    PubMed

    Cao, Xu; Zhang, Bin; Liu, Fei; Wang, Xin; Bai, Jing

    2011-12-01

    Limited-projection fluorescence molecular tomography (FMT) can greatly reduce the acquisition time, which is suitable for resolving fast biology processes in vivo but suffers from severe ill-posedness because of the reconstruction using only limited projections. To overcome the severe ill-posedness, we report a reconstruction method based on the projected restarted conjugate gradient normal residual. The reconstruction results of two phantom experiments demonstrate that the proposed method is feasible for limited-projection FMT. © 2011 Optical Society of America

  4. Devils Lake Flood Control Project. Section 205. Detailed Project Report.

    DTIC Science & Technology

    1983-10-01

    Sd.U.JS IWE 00 RlEP0OAT II PERIOD COVERED SE~CTION 205 DETAILED PROJECT REPORT FLOOD CONTROL Final. Oct 1979-July 1983 PROJECT AT DEVILS LAKE. NORTH...a few feet. The light loading proposed for the site and thick cover of impervious material make more detailed evaluation of the strength and water...can cause low-oapaoity channels to overflow, resulting in flood damages to crops . Because the subbasin has no outlet near the existing water surface

  5. The Heartfile Lodhran CVD prevention project--end of project evaluation.

    PubMed

    Nishtar, Sania; Badar, Asma; Kamal, Mohammad Umer; Iqbal, Azhar; Bajwa, Rashid; Shah, Tauqeer; Larik, Zahid; Karim, Fazle; Mehmood, Mahmood ul Hassan; Jehangir, Haroon; Azam, Syed Iqbal; Mirza, Yasir Abbas; Khan, Shahzad Ali; Qayyum, Aamra; Aqeel, Fauzia; Bakir, Abdul; Rahim, Ejaz

    2007-01-01

    Mainstream preventive interventions often fail to reach poor populations with a high risk of cardiovascular diseases (CVDs) in Pakistan. A community-based CVD primary prevention project aimed at developing approaches to reduce risk factors in such populations was established by Heartfile in collaboration with the National Rural Support Program in the district of Lodhran. The project implemented a range of activities integrated with existing social and health service mechanisms during a three year intervention period 2000/01-03/04. These were targeted in 4 key settings: community health education, mass media interventions, training of health professionals and health education through Lady Health Workers. The project received support from the Department for International Development, U.K. At the community level, a pre-test-post-test quasi-experimental design was used for examining project outcomes related to the community component of the intervention. Pre and post-intervention (training) evaluations were conducted involving all health care providers in randomly selected workshops in order to determine baseline levels of knowledge and the impact of training on knowledge level. In order to assess practices of physician and non-physician health care providers patient interviews, with control comparisons were conducted at each health care facility. Significant positive changes were observed in knowledge levels at a community level in the district of intervention compared with baseline knowledge levels particularly in relation to a heart healthy diet, beneficial level of physical activity, the causes of high blood pressure and heart attack and the effects of high blood pressure and active and passive smoking on health. Significant changes in behaviors at a practice level were not shown in the district of intervention. However the project played a critical role in spurring national action for the prevention and control of non-communicable diseases and introducing

  6. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    ERIC Educational Resources Information Center

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  7. Construction project management handbook.

    DOT National Transportation Integrated Search

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  8. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    PubMed

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  9. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  10. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  11. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  12. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  13. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  14. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  15. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  16. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  17. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  18. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  19. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  20. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project restrictions. 850.151... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  1. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  2. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  3. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  4. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  5. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  6. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  7. 7 CFR 550.16 - Project development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Project development. 550.16 Section 550.16 Agriculture... § 550.16 Project development. REE provides partial funding to Cooperators to support research projects... the REE Agency's ADODR shall jointly develop the following documentation: (a) Project plan. A plan...

  8. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  9. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  10. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  11. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  12. 40 CFR 35.2212 - Project initiation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project initiation. 35.2212 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2212 Project initiation. (a) The grantee shall expeditiously initiate and complete the project, in accordance with the project...

  13. Subsistence restoration project: Food safety testing. Exxon Valdez Oil Spill Restoration Project. Final report restoration project 94279

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miraglia, R.A.; Chartrand, A.W.

    1997-05-01

    The goal of this project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resources samples for hydrocarbon contamination, accompanying community representatives on tours of the laboratory where tests were conducted and informational newsletters. Over the two years of the project combined, 228 composite samples of edible tissues from shellfish were tested. The bile of forty rockfish, six sockeye salmon, twelve seals, twenty-three ducks were tested for the presence of hydrocarbon metabolites. Edible tissue (blubber) from seals was also tested. Generally, themore » tests showed such low levels of hydrocarbons and their metabolites, as to be within the test`s margin of error. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.« less

  14. The accuracy of general practitioner workforce projections

    PubMed Central

    2013-01-01

    Background Health workforce projections are important instruments to prevent imbalances in the health workforce. For both the tenability and further development of these projections, it is important to evaluate the accuracy of workforce projections. In the Netherlands, health workforce projections have been done since 2000 to support health workforce planning. What is the accuracy of the techniques of these Dutch general practitioner workforce projections? Methods We backtested the workforce projection model by comparing the ex-post projected number of general practitioners with the observed number of general practitioners between 1998 and 2011. Averages of historical data were used for all elements except for inflow in training. As the required training inflow is the key result of the workforce planning model, and has actually determined past adjustments of training inflow, the accuracy of the model was backtested using the observed training inflow and not an average of historical data to avoid the interference of past policy decisions. The accuracy of projections with different lengths of projection horizon and base period (on which the projections are based) was tested. Results The workforce projection model underestimated the number of active Dutch general practitioners in most years. The mean absolute percentage errors range from 1.9% to 14.9%, with the projections being more accurate in more recent years. Furthermore, projections with a shorter projection horizon have a higher accuracy than those with a longer horizon. Unexpectedly, projections with a shorter base period have a higher accuracy than those with a longer base period. Conclusions According to the results of the present study, forecasting the size of the future workforce did not become more difficult between 1998 and 2011, as we originally expected. Furthermore, the projections with a short projection horizon and a short base period are more accurate than projections with a longer projection

  15. Colorado State Capitol Geothermal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shepherd, Lance

    Colorado State Capitol Geothermal Project - Final report is redacted due to space constraints. This project was an innovative large-scale ground-source heat pump (GSHP) project at the Colorado State Capitol in Denver, Colorado. The project employed two large wells on the property. One for pulling water from the aquifer, and another for returning the water to the aquifer, after performing the heat exchange. The two wells can work in either direction. Heat extracted/added to the water via a heat exchanger is used to perform space conditioning in the building.

  16. Labeling Projections on Published Maps

    USGS Publications Warehouse

    Snyder, John P.

    1987-01-01

    To permit accurate scaling on a map, and to use the map as a source of accurate positions in the transfer of data, certain parameters - such as the standard parallels selected for a conic projection - must be stated on the map. This information is often missing on published maps. Three current major world atlases are evaluated with respect to map projection identification. The parameters essential for the projections used in these three atlases are discussed and listed. These parameters should be stated on any map based on the same projection.

  17. Geospace exploration project: Arase (ERG)

    NASA Astrophysics Data System (ADS)

    Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group

    2017-06-01

    The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.

  18. Phased Project Planning Guidelines

    NASA Technical Reports Server (NTRS)

    1968-01-01

    NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

  19. Project-Based Learning and Design-Focused Projects to Motivate Secondary Mathematics Students

    ERIC Educational Resources Information Center

    Remijan, Kelly W.

    2017-01-01

    This article illustrates how mathematics teachers can develop design-focused projects, related to project-based learning, to motivate secondary mathematics students. With first-hand experience as a secondary mathematics teacher, I provide a series of steps related to the engineering design process, which are helpful to teachers in developing…

  20. Doing the Project and Learning the Content: Designing Project-Based Science Curricula for Meaningful Understanding

    ERIC Educational Resources Information Center

    Kanter, David E.

    2010-01-01

    Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…

  1. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  2. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  3. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  4. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  5. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  6. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  7. 18 CFR 157.37 - Project design.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  8. 18 CFR 157.37 - Project design.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  9. Project W.A.T.E.R.

    ERIC Educational Resources Information Center

    EnviroTeach, 1992

    1992-01-01

    Introduces networking projects for studying rivers and water quality. Describes two projects in South Africa (Project W.A.T.E.R and SWAP) associated with the international network, Global Rivers Environmental Education Network. Discusses water test kits and educational material developed through Project W.A.T.E.R. (Water Awareness through…

  10. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  11. 7 CFR 4280.122 - Project eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project eligibility. 4280.122 Section 4280.122... Efficiency Improvements Program Section B. Guaranteed Loans § 4280.122 Project eligibility. For a project to be eligible to receive a guaranteed loan under this subpart, the project must meet each of the...

  12. 23 CFR 660.112 - Project development.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project development. 660.112 Section 660.112 Highways... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid...

  13. 36 CFR 64.5 - Eligible projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Eligible projects. 64.5... Eligible projects. (a) Abandoned railroad projects will be for recreation and/or conservation purposes including the acquisition of the rights-of-way involved and will be sponsored by a project applicant who has...

  14. 23 CFR 630.1010 - Significant projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...

  15. 36 CFR 64.11 - Project performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Project performance. 64.11... Project performance. The State or local applicant shall be responsible for insuring the project is carried... Force Account. Labor costs charged to a project for force account work will be based on payrolls...

  16. 40 CFR 35.2218 - Project performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards. (c...

  17. 40 CFR 35.2218 - Project performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards. (c...

  18. 40 CFR 35.2218 - Project performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards. (c...

  19. 40 CFR 35.2218 - Project performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards. (c...

  20. 23 CFR 630.1010 - Significant projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...