Sample records for team building process

  1. All for one and one for all: team building and nursing.

    PubMed

    Ryan, T

    1994-05-01

    Nursing care provision has become increasingly complex with the growth of health care systems in recent years. This has resulted in a greater emphasis upon the use of team approaches to providing care. This paper explores the nature of teams within nursing and how they can be developed. The membership of nursing teams and the differences between the type of teams is also examined. The process of team building in nursing teams and the way that induction programmes can play a part in this team building process is also discussed.

  2. Group facilitation: building that winning team.

    PubMed

    Krumberger, J M

    1992-12-01

    Team building does not occur by chance; it involves using techniques to make it easier for members to contribute their expertise while working with others to achieve quality results. Evaluation of team effectiveness involves assessing both the processes (team interactions and work processes) and accomplishment of goals (out-comes; see box). Productivity and quality that could not be accomplished by individual efforts may be enhanced by effectively working teams.

  3. A Descriptive Study of a Building-Based Team Problem-Solving Process

    ERIC Educational Resources Information Center

    Brewer, Alexander B.

    2010-01-01

    The purpose of this study was to empirically evaluate Building-Based Teams for General Education Intervention or BBT for GEI. BBT for GEI is a team problem-solving process designed to assist schools in conducting research-based interventions in the general education setting. Problem-solving teams are part of general education and provide support…

  4. Building an Inclusive Research Team: The Importance of Team Building and Skills Training

    ERIC Educational Resources Information Center

    Strnadová, Iva; Cumming, Therese M.; Knox, Marie; Parmenter, Trevor

    2014-01-01

    Background: Inclusive research teams typically describe their experiences and analyse the type of involvement of researchers with disability, but the process of building research teams and the need for research training still remain underexplored in the literature. Materials and Method: Four researchers with intellectual disabilities and four…

  5. The Use of Team-Building Activities to Build a Better Resident.

    PubMed

    Ireland, James D; Deloney, Linda A; Renfroe, Shyann; Jambhekar, Kedar

    We implemented team building activities to build a better resident during our orientation process and we have refined the choice of activities each year since. Resident satisfaction with their team building actives provided feedback to improve the following years' experience. While there is no definite way to demonstrate the effectiveness of our team building initiative, our expectation is it will improve the residency experience and work environment, and ultimately, result in better patient care. We focus on five aspects of team building - personal history sharing, creativity and imagination, common bonds, cooperation, and shared experience. The purpose of this paper is to recommend activities in each of these areas based on our experience. Published by Elsevier Inc.

  6. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    NASA Astrophysics Data System (ADS)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  7. Effective Team Practices: Interprofessional Contributions to Communication Issues With a Parent's Perspective.

    PubMed

    Cooper-Duffy, Karena; Eaker, Kerri

    2017-05-17

    This clinical focus article contains a detailed description of how to build effective teams that use interprofessional collaborative practice (IPCP) with special-education professionals, speech-language pathologists, and families of children with severe disabilities. This clinical focus article provides information on using the essential elements of team building and IPCP to provide quality care to families who have children with severe disabilities. The 6 essential elements for team building are described, with suggestions for including families in each: goal-setting, roles and responsibilities, effective and efficient process, communication and interpersonal relationships, collaborative problem solving, and evaluation. The 4 competency domains of IPCP are embedded into each of the team-building elements to demonstrate how teams can implement IPCP. A case study illustrates the difficulty one parent experienced working with a team across the 6 essential team-building elements when seeking communication services for her child with severe disabilities. Building teams with IPCP can be effective for including families and creating high-quality outcomes for individuals with severe disabilities.

  8. A systematic review of team-building interventions in non-acute healthcare settings.

    PubMed

    Miller, Christopher J; Kim, Bo; Silverman, Allie; Bauer, Mark S

    2018-03-01

    Healthcare is increasingly delivered in a team-based format emphasizing interdisciplinary coordination. While recent reviews have investigated team-building interventions primarily in acute healthcare settings (e.g. emergency or surgery departments), we aimed to systematically review the evidence base for team-building interventions in non-acute settings (e.g. primary care or rehabilitation clinics). We conducted a systematic review in PubMed and Embase to identify team-building interventions, and conducted follow-up literature searches to identify articles describing empirical studies of those interventions. This process identified 14 team-building interventions for non-acute healthcare settings, and 25 manuscripts describing empirical studies of these interventions. We evaluated outcomes in four domains: trainee evaluations, teamwork attitudes/knowledge, team functioning, and patient impact. Trainee evaluations for team-building interventions were generally positive, but only one study associated team-building with statistically significant improvement in teamwork attitudes/knowledge. Similarly mixed results emerged for team functioning and patient impact. The evidence base for healthcare team-building interventions in non-acute healthcare settings is much less developed than the parallel literature for short-term team function in acute care settings. Only one intervention we identified has been tested in multiple non-acute settings by distinct research teams. Positive findings regarding the utility of team-building interventions are tempered by a lack of control conditions, inconsistency in outcome measures, and high probability of bias. Considering these results alongside the well-recognized costs of poor healthcare teamwork suggests that additional research is sorely needed to develop the evidence base for team-building in non-acute settings.

  9. Better team management--better team care?

    PubMed

    Shelley, P; Powney, B

    1994-01-01

    Team building should not be a 'bolt-on' extra, it should be a well planned, integrated part of developing teams and assisting their leaders. When asked to facilitate team building by a group of NHS managers we developed a framework which enabled individual members of staff to become more effective in the way they communicated with each other, their teams and in turn within the organization. Facing the challenge posed by complex organizational changes, staff were able to use 3 training days to increase and develop their awareness of the principles of teamwork, better team management, and how a process of leadership and team building could help yield better patient care.

  10. A pilot study on the effects of a team building process on the perception of work environment in an integrative hospital for neurological rehabilitation.

    PubMed

    Ostermann, Thomas; Bertram, Mathias; Büssing, Arndt

    2010-03-09

    Neurological rehabilitation is one of the most care-intensive challenges in the health care system requiring specialist therapeutic and nursing knowledge. In this descriptive pilot study, we investigated the effects of a team building process on perceived work environment, self-ascribed professional competence, life satisfaction, and client satisfaction in an anthroposophic specialized hospital for neurological rehabilitation. The team-building process consisted of didactic instruction and training in problem-solving, teambuilding and constructive conflict resolution. Seventy seven staff members and 44 patients' relatives were asked to complete a survey that included the Work Environment Scale (WES-10), a Life Satisfaction Scale (BMLSS), the Conviction of Therapeutic Competency (CTC) scale and the Client Satisfaction Questionnaire (CSQ-8). To evaluate the outcome of the team building process, we analyzed changes over time in the WES-10 subscales. Additionally the interrelationship between the WES-10 subscales with other subscales and with sociodemographic parameters like age, gender was calculated by means of a bivariate correlation analysis. The team building process had a significant positive effect on perceived work environment in only one area. There was a significant improvement in the ward staffs' perception of their ability to constructively resolve conflicts 3 years after inception of the team building process than there was before inception. However, even in a unit that utilized holistic treatment and nursing in the care of severely disable patients, such care necessitating a very heavy workload, the measurements on the Self Realization, Life Satisfaction and Conviction of Therapeutic Competency scales remained high and unchanged over the three year time period of the study. Strategic interventions might be an option to improve interpersonal relationships and finally quality of patient care.

  11. A pilot study on the effects of a team building process on the perception of work environment in an integrative hospital for neurological rehabilitation

    PubMed Central

    2010-01-01

    Background Neurological rehabilitation is one of the most care-intensive challenges in the health care system requiring specialist therapeutic and nursing knowledge. In this descriptive pilot study, we investigated the effects of a team building process on perceived work environment, self-ascribed professional competence, life satisfaction, and client satisfaction in an anthroposophic specialized hospital for neurological rehabilitation. The team-building process consisted of didactic instruction and training in problem-solving, teambuilding and constructive conflict resolution. Methods Seventy seven staff members and 44 patients' relatives were asked to complete a survey that included the Work Environment Scale (WES-10), a Life Satisfaction Scale (BMLSS), the Conviction of Therapeutic Competency (CTC) scale and the Client Satisfaction Questionnaire (CSQ-8). To evaluate the outcome of the team building process, we analyzed changes over time in the WES-10 subscales. Additionally the interrelationship between the WES-10 subscales with other subscales and with sociodemographic parameters like age, gender was calculated by means of a bivariate correlation analysis. Results The team building process had a significant positive effect on perceived work environment in only one area. There was a significant improvement in the ward staffs' perception of their ability to constructively resolve conflicts 3 years after inception of the team building process than there was before inception. However, even in a unit that utilized holistic treatment and nursing in the care of severely disable patients, such care necessitating a very heavy workload, the measurements on the Self Realization, Life Satisfaction and Conviction of Therapeutic Competency scales remained high and unchanged over the three year time period of the study. Conclusions Strategic interventions might be an option to improve interpersonal relationships and finally quality of patient care. PMID:20214789

  12. The Army Family Team Building Program: Facilitating a Transformative Learning Process--An Intrinsic Case Study

    ERIC Educational Resources Information Center

    Gall, Joseph A.

    2009-01-01

    This study sought to understand how the Army Family Team Building program influences self-reliance and self-sufficiency in Army spouses as they integrate into the Army community. The purpose of the Army Family Team Building program is to empower Army spouses with knowledge and skills, which foster well-being and improve quality of life. The…

  13. Understanding medical practice team roles.

    PubMed

    Hills, Laura

    2015-01-01

    Do you believe that the roles your employees play on your medical practice team are identical to their job titles or job descriptions? Do you believe that team roles are determined by personality type? This article suggests that a more effective way to build and manage your medical practice team is to define team roles through employee behaviors. It provides 10 rules of behavioral team roles that can help practice managers to select and build high-performing teams, build more productive team relationships, improve the employee recruitment process, build greater team trust and understanding; and increase their own effectiveness. This article describes in detail Belbin's highly regarded and widely used team role theory and summarizes four additional behavioral team role theories and systems. It offers lessons learned when applying team role theory to practice. Finally, this article offers an easy-to-implement method for assessing current team roles. It provides a simple four-question checklist that will help practice managers balance an imbalanced medical practice team.

  14. Field Impact Evaluation Process on Electronic Tabular Display Subsystem (ETABS).

    DTIC Science & Technology

    1979-10-01

    structural and process techniques are described. These include a diagonal slice approach to team formulation and several different methods of team building, process control and conflict management . (Author)

  15. The dynamics of team cognition: A process-oriented theory of knowledge emergence in teams.

    PubMed

    Grand, James A; Braun, Michael T; Kuljanin, Goran; Kozlowski, Steve W J; Chao, Georgia T

    2016-10-01

    Team cognition has been identified as a critical component of team performance and decision-making. However, theory and research in this domain continues to remain largely static; articulation and examination of the dynamic processes through which collectively held knowledge emerges from the individual- to the team-level is lacking. To address this gap, we advance and systematically evaluate a process-oriented theory of team knowledge emergence. First, we summarize the core concepts and dynamic mechanisms that underlie team knowledge-building and represent our theory of team knowledge emergence (Step 1). We then translate this narrative theory into a formal computational model that provides an explicit specification of how these core concepts and mechanisms interact to produce emergent team knowledge (Step 2). The computational model is next instantiated into an agent-based simulation to explore how the key generative process mechanisms described in our theory contribute to improved knowledge emergence in teams (Step 3). Results from the simulations demonstrate that agent teams generate collectively shared knowledge more effectively when members are capable of processing information more efficiently and when teams follow communication strategies that promote equal rates of information sharing across members. Lastly, we conduct an empirical experiment with real teams participating in a collective knowledge-building task to verify that promoting these processes in human teams also leads to improved team knowledge emergence (Step 4). Discussion focuses on implications of the theory for examining team cognition processes and dynamics as well as directions for future research. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  16. U.S. Team Green Building Challenge 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2002-09-01

    Flier about the U.S. Team and its projects participating in the International Green Building Challenge. Along with many other countries, the United States accepted the Green Building Challenge (GBC), an international effort to evaluate and improve the performance of buildings worldwide. GBC started out in 1996 as a competition to determine which country had the greenest buildings; it evolved into a cooperative process among the countries to measure the performance of green buildings. Although the auto industry can easily measure efficiency in terms of miles per gallon, the buildings industry has no standard way to quantify energy and environmental performance.more » The Green Building Challenge participants hope that better tools for measuring the energy and environmental performance of buildings will be an outcome of their efforts and that these tools will lead to higher and better performance levels in buildings around the world. The ultimate goal is to design, construct, and operate buildings that contribute to global sustainability by conserving and/or regenerating natural resources and minimizing nonrenewable energy use. The United States' Green Building Challenge Team '02 selected five buildings from around the country to serve as case studies; each of the five U.S. building designs (as well as all international case studies) were assessed using an in-depth evaluation tool, called the Green Building Assessment Tool (GBTool). The GBTool was specifically created and refined by international teams, for the GBC efforts. The goal of this collaborative effort is to improve this evaluation software tool so that it can be used globally, while taking into account regional and national conditions. The GBTool was used by the U.S. Team to assess and evaluate the energy and environmental performance of these five buildings: (1) Retail (in operation): BigHorn Home Improvement Center, Silverthorne, Colorado; (2) Office (in operation), Philip Merrill Environmental; (3) School (in construction), Clearview Elementary School, Hanover, Pennsylvania; (4) Multi-family residential (in construction), Twenty River Terrace, Battery Park City, New York; and (5) Office/lab (in design), National Oceanic Atmospheric Administration, Honolulu, Hawaii. These projects were selected, not only because they were good examples of high-performance buildings and had interested owners/design team members, but also because building data was available as inputs to test the software tool. Both the tool and the process have been repeatedly refined and enhanced since the first Green Building Challenge event in 1998; participating countries are continuously providing feedback to further improve the tool and global process for the greatest positive effect.« less

  17. Team-building activities as strategies for improving community-university partnerships: lessons learned from Nuestro Futuro Saludable.

    PubMed

    Ndulue, Uchenna; Peréa, Flavia C; Kayou, Bashier; Martinez, Linda Sprague

    2012-01-01

    Collaboration characterized by mutual capacity building, asset sharing, and tangible outcomes that work to further health equity are central tenets of community-based participatory (CBPR) approaches to research. Such efforts require the establishment, development, and maintenance of trusting relationships between community and institutional stakeholders. The objective of the strategies discussed here was to strengthen a community-academic partnership by facilitating communication and empowering project partners. Team-building activities and experiential exercises were intentionally utilized with project stakeholders to clarify roles and responsibilities, provide alternative avenues for authentic communication, and share power. Team-building activities can be effective in promoting CBPR partnerships when utilized appropriately. Through the course of the partnership building process, best practices emerged for utilizing experiential learning exercises to enhance partnership dynamics. Team-building activities provide a useful tool for developing supportive environments that encourage open dialogue.

  18. Groups Meet . . . Teams Improve: Building Teams That Learn

    ERIC Educational Resources Information Center

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  19. Building Collective Communication Competence in Interdisciplinary Research Teams

    ERIC Educational Resources Information Center

    Thompson, Jessica Leigh

    2009-01-01

    Using a grounded theory approach, this investigation addresses how an interdisciplinary research (IDR) team negotiates meaning and struggles to establish and sustain a sense of collective communication competence (CCC). Certain communication processes were foundational to building CCC, such as spending time together, practicing trust, discussing…

  20. Lessons learned from a lateral violence and team-building intervention.

    PubMed

    Barrett, Ann; Piatek, Carolyn; Korber, Susan; Padula, Cynthia

    2009-01-01

    Lateral violence is likely to exist in settings characterized by poor leadership and lack of clearly articulated roles, expectations, and processes that guide behavior. The purposes of this process improvement project were to (1) identify and improve baseline levels of nurse satisfaction and group cohesion through planned unit-based interventions, (2) determine the effect of a team-building intervention on factors that impact cohesive team functioning, and (3) determine the effect of lateral violence training and communication style differences in improving team cohesion. The sample consisted of registered nurses (RNs) from 4 diverse patient care areas, chosen on the basis of low scores on the National Database of Nursing Quality Indicators (NDNQI) RN-RN interaction subscale. A quasi-experimental pre-post intervention design without a control group was employed. The intervention focused on lateral violence and team building. A qualitative component focused on the impact of the intervention on overall group dynamics and processes. RN scores on the Group Cohesion Scale (P = .037) and the RN-RN interaction scores improved postintervention. Group sessions focused on building trust, identifying and clarifying roles, engaging staff in decision making, role-modeling positive interactions, and holding each other accountable. Key to a cohesive environment is an effective nurse manager able to drive and sustain change.

  1. Building a team through a strategic planning process.

    PubMed

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  2. The Virtual Intercultural Team Tool

    ERIC Educational Resources Information Center

    Rus, Calin

    2010-01-01

    This article describes the Virtual Intercultural Team Tool (VITT) and discusses its processes and benefits. VIIT is a virtual platform designed with the aim of assisting European project teams to improve intercultural communication and build on their cultural diversity for effective implementation of their projects. It is a process-focused tool,…

  3. Team Learning: Building Shared Mental Models

    ERIC Educational Resources Information Center

    Van den Bossche, Piet; Gijselaers, Wim; Segers, Mien; Woltjer, Geert; Kirschner, Paul

    2011-01-01

    To gain insight in the social processes that underlie knowledge sharing in teams, this article questions which team learning behaviors lead to the construction of a shared mental model. Additionally, it explores how the development of shared mental models mediates the relation between team learning behaviors and team effectiveness. Analyses were…

  4. A strategic value management approach for energy and maintenance management in a building

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  5. Building a comprehensive team for the longitudinal care of single ventricle heart defects: Building blocks and initial results.

    PubMed

    Texter, Karen; Davis, Jo Ann M; Phelps, Christina; Cheatham, Sharon; Cheatham, John; Galantowicz, Mark; Feltes, Timothy F

    2017-07-01

    With increasing survival of children with HLHS and other single ventricle lesions, the complexity of medical care for these patients is substantial. Establishing and adhering to best practice models may improve outcome, but requires careful coordination and monitoring. In 2013 our Heart Center began a process to build a comprehensive Single Ventricle Team designed to target these difficult issues. Comprehensive Single Ventricle Team in 2014 was begun, to standardize care for children with single ventricle heart defects from diagnosis to adulthood within our institution. The team is a multidisciplinary group of providers committed to improving outcomes and quality of life for children with single ventricle heart defects, all functioning within the medical home of our heart center. Standards of care were developed and implemented in five target areas to standardize medical management and patient and family support. Under the team 100 patients have been cared for. Since 2014 a decrease in interstage mortality for HLHS were seen. Using a team approach and the tools of Quality Improvement they have been successful in reaching high protocol compliance for each of these areas. This article describes the process of building a successful Single Ventricle team, our initial results, and lessons learned. Additional study is ongoing to demonstrate the effects of these interventions on patient outcomes. © 2017 Wiley Periodicals, Inc.

  6. Leading Cultural Change in a School District through a Budget Building Collaboration

    ERIC Educational Resources Information Center

    Radford, Ricky Warren

    2009-01-01

    The purpose of this study was to assess, plan, and implement a budget building process through collaboration with the stakeholders of a targeted school district. The research question of this study was, "Will allowing the stakeholders more input, autonomy, and collaboration during a budget building process build a team environment and…

  7. Organizational and training factors that promote team science: A qualitative analysis and application of theory to the National Institutes of Health's BIRCWH career development program.

    PubMed

    Guise, Jeanne-Marie; Winter, Susan; Fiore, Stephen M; Regensteiner, Judith G; Nagel, Joan

    2017-04-01

    Research organizations face challenges in creating infrastructures that cultivates and sustains interdisciplinary team science. The objective of this paper is to identify structural elements of organizations and training that promote team science. We qualitatively analyzed the National Institutes of Health's Building Interdisciplinary Research Careers in Women's Health, K12 using organizational psychology and team science theories to identify organizational design factors for successful team science and training. Seven key design elements support team science: (1) semiformal meta-organizational structure, (2) shared context and goals, (3) formal evaluation processes, (4) meetings to promote communication, (5) role clarity in mentoring, (6) building interpersonal competencies among faculty and trainees, and (7) designing promotion and tenure and other organizational processes to support interdisciplinary team science. This application of theory to a long-standing and successful program provides important foundational elements for programs and institutions to consider in promoting team science.

  8. Huddle-coaching: a dynamic intervention for trainees and staff to support team-based care.

    PubMed

    Shunk, Rebecca; Dulay, Maya; Chou, Calvin L; Janson, Susan; O'Brien, Bridget C

    2014-02-01

    Many outpatient clinics where health professionals train will transition to a team-based medical home model over the next several years. Therefore, training programs need innovative approaches to prepare and incorporate trainees into team-based delivery systems. To address this need, educators at the San Francisco Veterans Affairs (VA) Medical Center included trainees in preclinic team "huddles," or briefing meetings to facilitate care coordination, and developed an interprofessional huddle-coaching program for nurse practitioner students and internal medicine residents who function as primary providers for patient panels in VA outpatient primary care clinics. The program aimed to support trainees' partnerships with staff and full participation in the VA's Patient Aligned Care Teams. The huddle-coaching program focuses on structuring the huddle process via scheduling, checklists, and designated huddle coaches; building relationships among team members through team-building activities; and teaching core skills to support collaborative practice. A multifaceted evaluation of the program showed positive results. Participants rated training sessions and team-building activities favorably. In interviews, trainees valued their team members and identified improvements in efficiency and quality of patient care as a result of the team-based approach. Huddle checklists and scores on the Team Development Measure indicated progress in team processes and relationships as the year progressed. These findings suggest that the huddle-coaching program was a worthwhile investment in trainee development that also supported the clinic's larger mission to deliver team-based, patient-aligned care. As more training sites shift to team-based care, the huddle-coaching program offers a strategy for successfully incorporating trainees.

  9. Team Building [in HRD].

    ERIC Educational Resources Information Center

    1995

    These five papers are from a symposium that was facilitated by Susan Dougherty at the 1995 conference of the Academy of Human Resource Development (HRD). "The Relationship between Productivity and Work Team Autonomy and Team Process Effectiveness" (Candice L. Phelan) reports that correlation analysis of results of a study of 21 work teams revealed…

  10. Building team adaptive capacity: the roles of sensegiving and team composition.

    PubMed

    Randall, Kenneth R; Resick, Christian J; DeChurch, Leslie A

    2011-05-01

    The current study draws on motivated information processing in groups theory to propose that leadership functions and composition characteristics provide teams with the epistemic and social motivation needed for collective information processing and strategy adaptation. Three-person teams performed a city management decision-making simulation (N=74 teams; 222 individuals). Teams first managed a simulated city that was newly formed and required growth strategies and were then abruptly switched to a second simulated city that was established and required revitalization strategies. Consistent with hypotheses, external sensegiving and team composition enabled distinct aspects of collective information processing. Sensegiving prompted the emergence of team strategy mental models (i.e., cognitive information processing); psychological collectivism facilitated information sharing (i.e., behavioral information processing); and cognitive ability provided the capacity for both the cognitive and behavioral aspects of collective information processing. In turn, team mental models and information sharing enabled reactive strategy adaptation.

  11. Transportable Payload Operations Control Center reusable software: Building blocks for quality ground data systems

    NASA Technical Reports Server (NTRS)

    Mahmot, Ron; Koslosky, John T.; Beach, Edward; Schwarz, Barbara

    1994-01-01

    The Mission Operations Division (MOD) at Goddard Space Flight Center builds Mission Operations Centers which are used by Flight Operations Teams to monitor and control satellites. Reducing system life cycle costs through software reuse has always been a priority of the MOD. The MOD's Transportable Payload Operations Control Center development team established an extensive library of 14 subsystems with over 100,000 delivered source instructions of reusable, generic software components. Nine TPOCC-based control centers to date support 11 satellites and achieved an average software reuse level of more than 75 percent. This paper shares experiences of how the TPOCC building blocks were developed and how building block developer's, mission development teams, and users are all part of the process.

  12. Championship Communication

    ERIC Educational Resources Information Center

    VanDerveer, Beth; Butterick, Betsy

    2017-01-01

    This article discusses team development and focuses specifically on championship communication and team-building activities. Team development takes time and the process typically occurs in stages. Regardless of the sport or what the competitive field may look like, communication is an often overlooked, yet vital element in cultivating a…

  13. Building an exceptional imaging management team: from theory to practice.

    PubMed

    Hogan, Laurie

    2010-01-01

    Building a strong, cohesive, and talented managerial team is a critical endeavor for imaging administrators, as the job will be enhanced if supported by a group of high-performing, well-developed managers. For the purposes of this article, leadership and management are discussed as two separate, yet equally important, components of an imaging administrator's role. The difference between the two is defined as: leadership relates to people, management relates to process. There are abundant leadership and management theories that can help imaging administrators develop managers and ultimately build a better team. Administrators who apply these theories in practical and meaningful ways will improve their teams' leadership and management aptitude. Imaging administrators will find it rewarding to coach and develop managers and witness transformations that result from improved leadership and management abilities.

  14. The Myers-Briggs Type Indicator as a Tool to Facilitate Learning Outcomes for Team Building in the Classroom

    ERIC Educational Resources Information Center

    Berry, Priscilla; Wood, Cindy; Thornton, Barry

    2007-01-01

    Globalization and domestic competition are forcing businesses to rethink the human resources utilization process, and one method for considering again this challenge is creating a team culture. One key to this process for human resources development is the understanding of how to create the most successful teams. The use of the Myers-Briggs Type…

  15. Building an inclusive research team: the importance of team building and skills training.

    PubMed

    Strnadová, Iva; Cumming, Therese M; Knox, Marie; Parmenter, Trevor

    2014-01-01

    Inclusive research teams typically describe their experiences and analyse the type of involvement of researchers with disability, but the process of building research teams and the need for research training still remain underexplored in the literature. Four researchers with intellectual disabilities and four academic researchers developed an inclusive research team. The team conducted 15 research training sessions, focused on investigating the well-being of older women with intellectual disabilities. They used mobile technology to support research skills acquisition. Findings included the experiences of all team members regarding the team building during training. To become an effective inclusive research team, all team members, regardless of ability, need to bring their own experiences and also learn necessary research skills. This paper highlights the need for team building, joint research training among all members of the research team and strategies supporting the peer-mentoring within the team. We are a team of four researchers with intellectual disabilities and four academic researchers without an intellectual disability. Our aim has been to learn about research together. We want to do this so that we can carry out a research project together about how older women with intellectual disabilities live. We have decided to call our team 'Welcome to our Class'. We have been working together for 9 months. In this time we have had 15 research training meetings. We have learned What research is How to work out a research question, that is what we want to find out about How to get information on what we want to find out. Here we thought of interview questions we could ask older women with intellectual disabilities. We are now meeting once a month, and have just begun our research on finding out how older women with intellectual disabilities live. We are now starting to use what we have learned. © 2013 John Wiley & Sons Ltd.

  16. Participative Work Design in Lean Production: A Strategy for Dissolving the Paradox between Standardized Work and Team Proactivity by Stimulating Team Learning?

    ERIC Educational Resources Information Center

    Lantz, Annika; Hansen, Niklas; Antoni, Conny

    2015-01-01

    Purpose: The purpose of this paper is to explore job design mechanisms that enhance team proactivity within a lean production system where autonomy is uttermost restricted. We propose and test a model where the team learning process of building shared meaning of work mediates the relationship between team participative decision-making, inter team…

  17. Building the dream team: don't make it a nightmare.

    PubMed

    Nelson, M; Nelson, S

    1997-11-01

    This article covers the often overlooked area of team management concepts through a discussion of what many companies have done to implement these new concepts successfully. It describes the basics of how to and also explains why people resist the process of implementation. The main topics are (1) team formation, (2) pitfalls to avoid, and (3) team measurement.

  18. Voice and Meaning-Making in Team Ethnography

    ERIC Educational Resources Information Center

    Creese, Angela; Blackledge, Adrian

    2012-01-01

    Drawing on research on complementary schools in the United Kingdom, this presentation considers some of the issues in the research method used in studying this after-school community site. Processes of analysis employed by the ethnography team are disclosed so as to illuminate the dynamics of theory building in a large research team. (Contains 2…

  19. Building trust and diversity in patient-centered oncology clinical trials: An integrated model.

    PubMed

    Hurd, Thelma C; Kaplan, Charles D; Cook, Elise D; Chilton, Janice A; Lytton, Jay S; Hawk, Ernest T; Jones, Lovell A

    2017-04-01

    Trust is the cornerstone of clinical trial recruitment and retention. Efforts to decrease barriers and increase clinical trial participation among diverse populations have yielded modest results. There is an urgent need to better understand the complex interactions between trust and clinical trial participation. The process of trust-building has been a focus of intense research in the business community. Yet, little has been published about trust in oncology clinical trials or the process of building trust in clinical trials. Both clinical trials and business share common dimensions. Business strategies for building trust may be transferable to the clinical trial setting. This study was conducted to understand and utilize contemporary thinking about building trust to develop an Integrated Model of Trust that incorporates both clinical and business perspectives. A key word-directed literature search of the PubMed, Medline, Cochrane, and Google Search databases for entries dated between 1 January 1985 and 1 September 2015 was conducted to obtain information from which to develop an Integrated Model of Trust. Successful trial participation requires both participants and clinical trial team members to build distinctly different types of interpersonal trust to effect recruitment and retention. They are built under conditions of significant emotional stress and time constraints among people who do not know each other and have never worked together before. Swift Trust and Traditional Trust are sequentially built during the clinical trial process. Swift trust operates during the recruitment and very early active treatment phases of the clinical trial process. Traditional trust is built over time and operates during the active treatment and surveillance stages of clinical trials. The Psychological Contract frames the participants' and clinical trial team members' interpersonal trust relationship. The "terms" of interpersonal trust are negotiated through the psychological contract. Contract renegotiation occurs in response to cyclical changes within the trust relationship throughout trial participation. The Integrated Model of Trust offers a novel framework to interrogate the process by which diverse populations and clinical trial teams build trust. To our knowledge, this is the first model of trust-building in clinical trials that frames trust development through integrated clinical and business perspectives. By focusing on the process, rather than outcomes of trust-building diverse trial participants, clinical trials teams, participants, and cancer centers may be able to better understand, measure, and manage their trust relationships in real time. Ultimately, this may foster increased recruitment and retention of diverse populations to clinical trials.

  20. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrish, Kristen

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  1. A novel approach for effective integration of new faculty leadership

    PubMed Central

    Hastings, Natalie B; Centore, Linda S; Gansky, Stuart A; Finzen, Frederick C; White, Joel M; Wong, Eric; Marshall, Grayson W; Chung, Lisa; Kalenderian, Elsbeth

    2017-01-01

    Purpose We report on an accelerated and effective way of assimilating a new leader into a team at a large academic dental school department. Methods At University of California, San Francisco (UCSF), a new Chair was recruited through a national search to lead its largest department in the School of Dentistry. Two months after arrival, the new Chair embarked on a process of leadership assimilation among her executive team, facilitated by a professional consultant. Within four weeks, team members participated in one-on-one interviews with the professional facilitator consultant and then completed the leadership assimilation questionnaire and returned it electronically to the facilitator. The facilitator then summarized all answers into themes and met with the team members without the Chair to debrief. Thereafter, the facilitator met with the Chair to discuss the major themes. Next, the Chair met with the team members in a facilitated session to discuss the results and negotiate a path forward. Results Approximately half of the feedback described the “how” of leadership: comments on communication, building relationships, building trust, and understanding UCSF history. The remaining half described the “what”: comments on vision, strategy, and operations. Team members indicated that the first debriefing session was helpful to alleviate initial anxiety and to start building team spirit. The session with the Chair was perceived as open and fruitful in which team members were able to express their concerns and hopes for the Department, while the Chair showed commitment to the team and the communication process. Conclusion Leader assimilation allows teams to share their expectations and anxieties with the new leader early in the relationship in an open way, before new habits and beliefs are formed. Conversely, for the leader, it effectively and efficiently allows a window into the team members’ thinking at a critical time period when otherwise first impressions occur. With a safe space created for open communication, the process allowed siloed individual division leaders to move toward a cohesive group while at the same time solidifying a commitment to the success of the new leader. PMID:29720883

  2. A novel approach for effective integration of new faculty leadership.

    PubMed

    Hastings, Natalie B; Centore, Linda S; Gansky, Stuart A; Finzen, Frederick C; White, Joel M; Wong, Eric; Marshall, Grayson W; Chung, Lisa; Kalenderian, Elsbeth

    2017-01-01

    We report on an accelerated and effective way of assimilating a new leader into a team at a large academic dental school department. At University of California, San Francisco (UCSF), a new Chair was recruited through a national search to lead its largest department in the School of Dentistry. Two months after arrival, the new Chair embarked on a process of leadership assimilation among her executive team, facilitated by a professional consultant. Within four weeks, team members participated in one-on-one interviews with the professional facilitator consultant and then completed the leadership assimilation questionnaire and returned it electronically to the facilitator. The facilitator then summarized all answers into themes and met with the team members without the Chair to debrief. Thereafter, the facilitator met with the Chair to discuss the major themes. Next, the Chair met with the team members in a facilitated session to discuss the results and negotiate a path forward. Approximately half of the feedback described the "how" of leadership: comments on communication, building relationships, building trust, and understanding UCSF history. The remaining half described the "what": comments on vision, strategy, and operations. Team members indicated that the first debriefing session was helpful to alleviate initial anxiety and to start building team spirit. The session with the Chair was perceived as open and fruitful in which team members were able to express their concerns and hopes for the Department, while the Chair showed commitment to the team and the communication process. Leader assimilation allows teams to share their expectations and anxieties with the new leader early in the relationship in an open way, before new habits and beliefs are formed. Conversely, for the leader, it effectively and efficiently allows a window into the team members' thinking at a critical time period when otherwise first impressions occur. With a safe space created for open communication, the process allowed siloed individual division leaders to move toward a cohesive group while at the same time solidifying a commitment to the success of the new leader.

  3. Planning and conducting a multi-institutional project on fatigue.

    PubMed

    Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E

    1998-09-01

    To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.

  4. Building a leadership team that works.

    PubMed

    Blomenberg, Emily M

    2005-01-01

    Radiology administrators often are challenged to do more with less. In today's fast-paced work environment, leaders must be creative. They must surround themselves with good people in order to successfully achieve their organizations' goals. Once a radiology administrator is satisfied and comfortable that he or she has, the right staff involved, a leadership team can be formally establislished. Howard Regional Health System established an Imaging Services Leadership Team with a vision to provide leaders for the staff to "follow," just as team members learn from the radiology administrator. In addition, team members are vital in assisting the radiology administrator in managing the department The process of building the team consisted of 3 steps: selecting team members (the most challenging and time-consuming component), formalizing a functional team, and putting the team into action. Finding the right people, holding regular meetings, and making those team meetings meaningful are keys to a successful leadership team. The implementation of the team has had a positive effect on imaging services: the number of procedures has increased, the team is used as a communication tool for front-line staff, front-line staff are becoming more comfortable with making decisions.

  5. Codes Don't Always Get Enforced, But Contracts Do: Changing the Procurement Paradigm to Drive Building Energy Performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torcellini, Paul A; Scheib, Jennifer G; Pless, Shanti

    New construction could account for more than 25% of the U.S. energy consumption by 2030. Millions of square feet are built every year that will not perform as expected - despite advancing codes, rating systems, super-efficient technologies, and advanced utility programs. With retrofits of these under-performers decades away, savings potential will be lost for years to come. Only the building owner is in the driver's seat to demand - and verify - higher-performing buildings. Yet our current policy and market interventions really target the design team, not the owner. Accelerate Performance, a U.S. Department of Energy funded initiative, is changingmore » the building procurement approach to drive deeper, verified savings in three pilot states: Illinois, Minnesota, and Connecticut. Performance-based procurement ties energy performance to design and contractor team compensation while freeing them to meet energy targets with strategies most familiar to them. The process teases out the creativity of the design and contracting teams to deliver energy performance - without driving up the construction cost. The paper will share early results and lessons learned from new procurement and contract approaches in government, public, and private sector building projects. The paper provides practical guidance for building owners, facilities managers, design, and contractor teams who wish to incorporate effective performance-based procurement for deeper energy savings in their buildings.« less

  6. Collaborative Learning Processes in the Context of a Public Health Professional Development Program: A Case Study

    ERIC Educational Resources Information Center

    Tremblay, Marie-Claude; Richard, Lucie; Brousselle, Astrid; Chiocchio, François; Beaudet, Nicole

    2017-01-01

    The health promotion laboratory (HPL-Canada) is a public health professional development program building on a collaborative learning approach in order to support long-term practice change in local health services teams. This study aims to analyse the collaborative learning processes of two teams involved in the program during the first year of…

  7. Team building: conceptual, methodological, and applied considerations.

    PubMed

    Beauchamp, Mark R; McEwan, Desmond; Waldhauser, Katrina J

    2017-08-01

    Team building has been identified as an important method of improving the psychological climate in which teams operate, as well as overall team functioning. Within the context of sports, team building interventions have consistently been found to result in improvements in team effectiveness. In this paper we review the extant literature on team building in sport, and address a range of conceptual, methodological, and applied considerations that have the potential to advance theory, research, and applied intervention initiatives within the field. This involves expanding the scope of team building strategies that have, to date, primarily focused on developing group cohesion. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Zero Energy Schools: The Challenges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torcellini, Paul A

    School buildings have a lot of potential to achieve zero energy (ZE) in new construction as well as in retrofits. There are many examples of schools operating at ZE, and many technical resources available to guide school districts and their design and construction teams through the process. When school districts embark on the path to ZE, however, they often confront challenges related to processes and a perception that ZE buildings require 'new,' unconventional, and expensive technologies, materials, or equipment. Here are some of the challenges school districts and their design and construction teams commonly encounter, and the solutions they usemore » to overcome them.« less

  9. A Middle School's Response-to-Intervention Journey: Building Systematic Processes of Facilitation, Collaboration, and Implementation

    ERIC Educational Resources Information Center

    Dulaney, Shannon K.

    2013-01-01

    This article discusses a qualitative case study examining one middle school's response to intervention (RtI) efforts. Study participants included the principal, assistant principal, and members of the school's leadership team. A description of the RtI consensus and infrastructure-building processes, consideration of the RtI facilitators, and a…

  10. A Practice Improvement Education Program Using a Mentored Approach to Improve Nursing Facility Depression Care-Preliminary Data.

    PubMed

    Chodosh, Joshua; Price, Rachel M; Cadogan, Mary P; Damron-Rodriguez, JoAnn; Osterweil, Dan; Czerwinski, Alfredo; Tan, Zaldy S; Merkin, Sharon S; Gans, Daphna; Frank, Janet C

    2015-11-01

    Depression is common in nursing facility residents. Depression data obtained using the Minimum Data Set (MDS) 3.0 offer opportunities for improving diagnostic accuracy and care quality. How best to integrate MDS 3.0 and other data into quality improvement (QI) activity is untested. The objective was to increase nursing home (NH) capability in using QI processes and to improve depression assessment and management through focused mentorship and team building. This was a 6-month intervention with five components: facilitated collection of MDS 3.0 nine-item Patient Health Questionnaire (PHQ-9) and medication data for diagnostic interpretation; education and modeling on QI approaches, team building, and nonpharmacological depression care; mentored team meetings; educational webinars; and technical assistance. PHQ-9 and medication data were collected at baseline and 6 and 9 months. Progress was measured using team participation measures, attitude and care process self-appraisal, mentor assessments, and resident depression outcomes. Five NHs established interprofessional teams that included nursing (44.1%), social work (20.6%), physicians (8.8%), and other disciplines (26.5%). Members participated in 61% of eight offered educational meetings (three onsite mentored team meetings and five webinars). Competency self-ratings improved on four depression care measures (P = .05 to <.001). Mentors observed improvement in team process and enthusiasm during team meetings. For 336 residents with PHQ-9 and medication data, depression scores did not change while medication use declined, from 37.2% of residents at baseline to 31.0% at 9 months (P < .001). This structured mentoring program improved care processes, achieved medication reductions, and was well received. Application to other NH-prevalent syndromes is possible. © 2015, Copyright the Authors Journal compilation © 2015, The American Geriatrics Society.

  11. A Team Building Model for Software Engineering Courses Term Projects

    ERIC Educational Resources Information Center

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  12. Clinical interdisciplinary health team care: an educational experiment.

    PubMed

    Mazur, H; Beeston, J J; Yerxa, E J

    1979-09-01

    With increasing concern for teamwork in clinical practice in health care settings, the need to identify the concepts, methods, and learning processes for improving interdisciplinary team skills is apparent. This paper describes patient-centered, clinical-research-demonstration programs for teams of students, preceptors, and faculty members from six disciplines who provided patient care in a long-term rehabilitation setting. The teams were involved in the theory and practice of team-building, including weekly sessions on leadership styles, communication, group decision-making, and team effectiveness assessment. Objective and subjective measurements were administered throughout the program. The results indicate that task-oriented patient care favors the learning of team skills, especially when all levels of administration support and participate in the processes. Question are raised concerning the effect of clinical teams on the quality of patient care, their cost-effectiveness, and the low priority given to teaching interdisciplinary team skills in professional education.

  13. The impact of team building on communication and job satisfaction of nursing staff.

    PubMed

    Amos, Mary Anne; Hu, Jie; Herrick, Charlotte A

    2005-01-01

    A series of team-building activities were conducted on a medical-surgical unit and their impact on staff's communication and job satisfaction was examined. Forty-four unit personnel participated in the interventions. Staff communication and job satisfaction were measured before and after the intervention. The findings linked team-building activities with improved staff communication and job satisfaction. Team-building strategies assisted the nurse leader/manager to build an effective work team by strengthening communication and interpersonal relationships so that the staff could function as a more cohesive group. Staff development consultants can help nurse managers become more effective team leaders by identifying the necessary resources and by helping to plan and coordinate team-building strategies.

  14. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheib, J.; Pless, S.; Torcellini, P.

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less

  15. The human side of lean teams.

    PubMed

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  16. Effects of team-building on communication and teamwork among nursing students.

    PubMed

    Yi, Y J

    2016-03-01

    The aim of this study was to assess the effects of team-building on communication and teamwork (i.e. teamwork skills and team effectiveness) among nursing students. Team-building is effective for improving communication and teamwork among the nursing organization. However, the effects of team-building are not well known especially in Korea. This study used a quasi-experimental design. The sample was composed of 195 junior-year nursing students in Korea. The experimental group (100 subjects) participated in team-building activities over a 100-day period, whereas no intervention was applied to the control group (95 subjects). Pretest was conducted in both groups, and post-test was conducted after the 100-day intervention. The pre-post change in mean communication competence score did not differ between the two groups. However, the mean scores for teamwork skills and team effectiveness differed significantly between the two groups after team-building activity. This study was not a double-blind test, and randomized sampling was not implemented. Caution should thus be used when interpreting the findings. Team-building activities were effective for improving the teamwork skills and team effectiveness among Korean nursing students. It is recommended that team-building activities should be included regularly as an integral educational approach in nursing education. The findings suggest that suggests that team-building for improving communication and teamwork should be designated as one of the required criteria for nursing college programme accreditation in many countries, including Korea. However team-building requires further testing to verify this across cultures. Nurses need to receive formal team-building training for improving communication and teamwork, and formal education should be included in their job training schedule. It is recommended that communication competence and teamwork be used as one of job performance evaluations in their workplace. © 2015 International Council of Nurses.

  17. Intensive care nurses' perceptions of simulation-based team training for building patient safety in intensive care: a descriptive qualitative study.

    PubMed

    Ballangrud, Randi; Hall-Lord, Marie Louise; Persenius, Mona; Hedelin, Birgitta

    2014-08-01

    To describe intensive care nurses' perceptions of simulation-based team training for building patient safety in intensive care. Failures in team processes are found to be contributory factors to incidents in an intensive care environment. Simulation-based training is recommended as a method to make health-care personnel aware of the importance of team working and to improve their competencies. The study uses a qualitative descriptive design. Individual qualitative interviews were conducted with 18 intensive care nurses from May to December 2009, all of which had attended a simulation-based team training programme. The interviews were analysed by qualitative content analysis. One main category emerged to illuminate the intensive care nurse perception: "training increases awareness of clinical practice and acknowledges the importance of structured work in teams". Three generic categories were found: "realistic training contributes to safe care", "reflection and openness motivates learning" and "finding a common understanding of team performance". Simulation-based team training makes intensive care nurses more prepared to care for severely ill patients. Team training creates a common understanding of how to work in teams with regard to patient safety. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Virtual Team Communication and Collaboration in Army and Corporate Applications

    DTIC Science & Technology

    2009-06-12

    Sharmila Pixy Ferri , 49-75. Hershey, PA: Idea Group Inc. Brown, Frederic J. 2006. Building high-performing commander leader teams: Intensive collaboration...Process, Technologies and Practice eds. Susan Hayes Godar and Sharmila Pixy Ferri , 49- 75. Hershey, Pennsylvania: Idea Group Inc. DeMarie, Samuel M. 2000

  19. Advice for running a successful research team.

    PubMed

    Stanley, David; Anderson, Judith

    2015-11-01

    To explore what is meant by a 'research team' and offer practical suggestions for supporting an effective and productive, collaborative research team. Collaborative research has become one of the main objectives of most higher education institutions and running effective research teams is central to achieving this aim. However, there is limited guidance in the literature about how to run or steer a research team. Search engines/databases used: CINAHL, Nursing and Allied Health Source, Primo search, Google search and Health Collection to access research articles and publications to support this topic. Literature search was extended to the end of 2014. Publications were reviewed for relevance to the topic via standard literature search. Research teams vary in size and composition, however they all require effective collaboration if they are to establish successful and flexible working relationships and produce useful and trustworthy research outputs. This article offers guidance for establishing and managing successful collaborative research relationships, building trust and a positive research team culture, clarifying team member roles, setting the teams' research agenda and managing the teams' functions so that team members feel able to contribute fully to the research goals and build a culture of support and apply 'emotional intelligence' throughout the process of building and running a successful research team. Collaboration is a central component of establishing successful research teams and enabling productive research outputs. This article offers guidance for research teams to help them to function more effectively and allow all members to contribute fully to each team's goals. Research teams that have established trust and a positive team culture will result in more efficient working relationships and potentially greater productivity. The advice offered reinforces the value of having research teams with diverse members from different disciplines, philosophical roots and backgrounds. Each of these members should be able to contribute skills and expertise so that the parts of the team are able to develop 'synergy' and result in more productive, positive and rewarding research experiences, as well as more effective research.

  20. Students Compete in NASA's Student Launch Competition

    NASA Image and Video Library

    2018-03-30

    NASA's Student Launch competition challenges middle school, high school and college teams to design, build, test and fly a high-powered, reusable rocket to an altitude of one mile above ground level while carrying a payload. During the eight-month process, the selected teams will go through a series of design, test and readiness reviews that resemble the real-world process of rocket development. In addition to building and preparing their rocket and payload, the teams must also create and execute an education and outreach program that will share their work with their communities and help inspire the next generation of scientists, engineers and explorers. Student Launch is hosted by NASA's Marshall Space Flight Center in Huntsville, Alabama, and is managed by Marshall's Academic Affairs Office to further NASA’s major education goal of attracting and encouraging students to pursue degrees and careers in the STEM fields of science, technology, engineering and mathematics.

  1. Identifying, building, and sustaining your leadership team.

    PubMed

    Feldman, Harriet R

    Effective leadership teams are important to the success of any organization, regardless of size or scope. This article uses the concepts of social capital and trust to shed light on team building skills and focuses on strategies that leaders can use to assemble, build, and sustain their leadership teams. Written from the perspective of someone who has had many years of experience in leadership roles, the article includes actual examples and tactics used to develop and mentor team members, foster social networks to build the team, and imbue trust to sustain the team. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. Requirements Engineering in Building Climate Science Software

    ERIC Educational Resources Information Center

    Batcheller, Archer L.

    2011-01-01

    Software has an important role in supporting scientific work. This dissertation studies teams that build scientific software, focusing on the way that they determine what the software should do. These requirements engineering processes are investigated through three case studies of climate science software projects. The Earth System Modeling…

  3. Building a Community of Research Practice: Intragroup Team Social Dynamics in Interdisciplinary Mixed Methods

    ERIC Educational Resources Information Center

    Hemmings, Annette; Beckett, Gulbahar; Kennerly, Susan; Yap, Tracey

    2013-01-01

    This article explicates the intragroup social dynamics and work of a nursing and education research team as a community of research practice interested in organizational cultures and occupational subcultures. Dynamics were characterized by processes of socialization through reeducation and group social identity formation that enabled members to…

  4. Delegation and Other Teambuilding Processes: Transforming Your Department and Programs.

    ERIC Educational Resources Information Center

    Phelan, Daniel

    Team building and delegation are two of the most important tools available to division chairs or academic officers for increasing productivity and allowing employees to grow, but they are both often misunderstood, misused, or unused. Teams are small groups with the authority and technical, interpersonal, and managerial skills to carry out…

  5. Cooperation, Coordination, and Trust in Virtual Teams: Insights from Virtual Games

    NASA Astrophysics Data System (ADS)

    Korsgaard, M. Audrey; Picot, Arnold; Wigand, Rolf T.; Welpe, Isabelle M.; Assmann, Jakob J.

    This chapter considers fundamental concepts of effective virtual teams, illustrated by research on Travian, a massively multiplayer online strategy game wherein players seek to build empires. Team inputs are the resources that enable individuals to work interdependently toward a common goal, including individual and collective capabilities, shared knowledge structures, and leadership style. Team processes, notably coordination and cooperation, transform team inputs to desired collective outcomes. Because the members of virtual teams are geographically dispersed, relying on information and communication technology, three theories are especially relevant for understanding how they can function effectively: social presence theory, media richness theory, and media synchronicity theory. Research in settings like Travian can inform our understanding of structures, processes, and performance of virtual teams. Such research could provide valuable insight into the emergence and persistence of trust and cooperation, as well as the impact of different communication media for coordination and information management in virtual organizations.

  6. NASA's Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) In-Field Demonstration at Desert RATS 2010

    NASA Technical Reports Server (NTRS)

    Tri, Terry O.; Kennedy, Kriss J.; Toups, Larry; Gill, Tracy R.; Howe, A. Scott

    2011-01-01

    This paper describes the construction, assembly, subsystem integration, transportation, and field testing operations associated with the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) and discusses lessons learned. In a one-year period beginning summer 2009, a tightly scheduled design-develop-build process was utilized by a small NASA "tiger team" to produce the functional HDU-PEM prototype in time to participate in the 2010 Desert Research and Technology Studies (Desert RATS) field campaign. The process required the coordination of multiple teams, subcontractors, facility management and safety staff. It also required a well-choreographed material handling and transportation process to deliver the finished product from the NASA-Johnson Space Center facilities to the remote Arizona desert locations of the field test. Significant findings of this paper include the team s greater understanding of the HDU-PEM s many integration issues and the in-field training the team acquired which will enable the implementation of the next-generation of improvements and development of high-fidelity field operations in a harsh environment. The Desert RATS analog environment is being promoted by NASA as an efficient means to design, build, and integrate multiple technologies in a mission architecture context, with the eventual goal of evolving the technologies into robust flight hardware systems. The HDU-PEM in-field demonstration at Desert RATS 2010 provided a validation process for the integration team, which has already begun to retool for the 2011 field tests that require an adapted architecture.

  7. Improvisational Theater Games: Performatory Team-Building Activities

    ERIC Educational Resources Information Center

    Ingalls, Joan S.

    2018-01-01

    This article describes five improvisational theater games for building "teams" in the classroom and on the sports field. Particular attention is given to understanding how teams must challenge the hyper-individuality of modern culture. Improvisational theater games for team building are designed to help participants find a balance…

  8. The Undergraduate Student Instrument Project (USIP) - building the STEM workforce by providing exciting, multi-disciplinary, student-led suborbital flight projects.

    NASA Astrophysics Data System (ADS)

    Dingwall, B. J.

    2015-12-01

    NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that were necessary for success. A student survey was conducted to assess the impact of USIP. Over 90% of students reported a significant improvement in their technical and project management skills. Perhaps more importantly, 88% of students reported that they have a far better appreciation for the value of multi-disciplinary teams.

  9. Building New Teams for Late Life Care: Lessons From LifeCourse.

    PubMed

    Schellinger, Sandra; Cain, Cindy L; Shibrowski, Kathleen; Elumba, Deborah; Rosenberg, Erin

    2016-07-01

    This article details team development within a longitudinal cohort study designed to bring team-based, whole person care early in the course of serious illness. The primary innovation of this approach is the use of nonclinically trained care guides who support patients and family members by focusing care around what matters most to patients, linking to resources, collaborating with other providers, and offering continuity through care transitions. By describing the development of this team, we document the kinds of questions others may ask during the process of team creation. © The Author(s) 2015.

  10. Building Career Tech Programs into Career Academies

    ERIC Educational Resources Information Center

    Delano, Rick; Mittelsteadt, Sandy

    2005-01-01

    In Manatee County, Florida, not only did they build career tech programs into career academies, but they also developed an evaluation process to ensure these career academies were credible. A District Academic team created the "Documentation of Academy Assessment Criteria" with 12 core components and a rubric that helps evaluators…

  11. Work in Progress: The Seven Rs of Team Building

    ERIC Educational Resources Information Center

    Brunelli, Jean; Schneider, Elaine Fogel

    2004-01-01

    This article argues that supportive teams--including professionals, paraprofessionals, and parents--can teach staff members how to identify and implement best practices in early intervention settings. The authors describe "the seven Rs of team building" distilled from their many years of team building and maintenance: 1) Reading cues; 2) Regular…

  12. Leading virtual teams: hierarchical leadership, structural supports, and shared team leadership.

    PubMed

    Hoch, Julia E; Kozlowski, Steve W J

    2014-05-01

    Using a field sample of 101 virtual teams, this research empirically evaluates the impact of traditional hierarchical leadership, structural supports, and shared team leadership on team performance. Building on Bell and Kozlowski's (2002) work, we expected structural supports and shared team leadership to be more, and hierarchical leadership to be less, strongly related to team performance when teams were more virtual in nature. As predicted, results from moderation analyses indicated that the extent to which teams were more virtual attenuated relations between hierarchical leadership and team performance but strengthened relations for structural supports and team performance. However, shared team leadership was significantly related to team performance regardless of the degree of virtuality. Results are discussed in terms of needed research extensions for understanding leadership processes in virtual teams and practical implications for leading virtual teams. (c) 2014 APA, all rights reserved.

  13. The structural approach to shared knowledge: an application to engineering design teams.

    PubMed

    Avnet, Mark S; Weigel, Annalisa L

    2013-06-01

    We propose a methodology for analyzing shared knowledge in engineering design teams. Whereas prior work has focused on shared knowledge in small teams at a specific point in time, the model presented here is both scalable and dynamic. By quantifying team members' common views of design drivers, we build a network of shared mental models to reveal the structure of shared knowledge at a snapshot in time. Based on a structural comparison of networks at different points in time, a metric of change in shared knowledge is computed. Analysis of survey data from 12 conceptual space mission design sessions reveals a correlation between change in shared knowledge and each of several system attributes, including system development time, system mass, and technological maturity. From these results, we conclude that an early period of learning and consensus building could be beneficial to the design of engineered systems. Although we do not examine team performance directly, we demonstrate that shared knowledge is related to the technical design and thus provide a foundation for improving design products by incorporating the knowledge and thoughts of the engineering design team into the process.

  14. Evaluation of a Core Team Centred Professional Development Programme for Building a Whole-School Cooperative Problem Solving Approach to Conflict

    ERIC Educational Resources Information Center

    White, Andrew Jonathan; Wertheim, Eleanor H.; Freeman, Elizabeth; Trinder, Margot

    2013-01-01

    This study evaluated a professional learning approach using a core team (CT) model to assist primary (elementary) schools to develop whole-school collaborative conflict resolution processes. Thirteen schools were matched and randomly assigned to the enhancing relationships in school communities programme ("n"?=?10) or a non-programme…

  15. A PLG (Professional Learning Group): How to Stimulate Learners' Engagement in Problem-Solving

    ERIC Educational Resources Information Center

    Sheety, Alia; Rundell, Frida

    2012-01-01

    This paper aims to describe, discuss and reflect the use of PLGs (professional learning groups) in higher education as a practice for enhancing student learning and team building. It will use theories supporting group-learning processes, explore optimal social contexts that enhance team collaboration, and reflect on the practice of PLG. The…

  16. Games of Character: Team Sports, Games, and Character Development in Victorian Public Schools, 1850-1900

    ERIC Educational Resources Information Center

    Dishon, Gideon

    2017-01-01

    This article examines the ascendance of team sports as tools of "character building" in British Victorian public schools in the second half of the nineteenth century. The focus of this enquiry is the commonly overlooked pedagogical innovation underlying this process--the utilisation of "organised games" as educational tools.…

  17. Strategic re-design of team-based patient-focused health care services.

    PubMed

    Tahara, Denise C; Green, Richard P

    2014-01-01

    This paper proposes an organizational change process to prepare physicians and other health professionals for their new roles in patient-centered medical homes (PCMHs). It provides physician-centered tools, models, concepts, and the language to implement transformational patient-centered medical care. To improve care delivery, quality, and patient engagement, a systems approach to care is required. This paper examines a systems approach to patient care where all inputs that influence patient interactions and participation are considered in the design of health care delivery and follow-up treatment plans. Applying systems thinking, organizational change models, and team-building, we have examined the continuum of this change process from ideation through the diffusion of new methods and behaviors. PCMHs make compelling business sense. Studies have shown that the PCMH improves patient satisfaction, clinical outcomes and reduces underuse and overuse of medical services. Patient-centered care necessitates transitioning from an adversarial to a collaborative culture. It is a transformation process predicated on strong leadership able to align an organization toward a vision of patient-centered care, creating a collaborative culture committed to health-goal achievement. This paper proposes that the PCMH is a rigorous team-building transformational organizational change, a radical departure from the current hierarchical, silo-oriented, medical practice model. It requires that participants within and across health care organizations learn new skills and behaviors to achieve the anticipated quality and efficiency improvements. It is an innovative health care organization model of the future whose success is premised on teams supplanting the individual as the building block and unit of health care performance.

  18. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  19. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  20. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  1. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  2. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  3. Are self-directed work teams successful and effective tools for today`s organization?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnwine, A.D.

    1995-03-01

    The purpose of this research is to (1) show the effectiveness and success of self-directed work teams within the organization, (2) emphasize the importance of team building in the success of the team, and (3) assist organizations in building self-directed work teams. The researcher used a direct survey and studied the following team building techniques: (1) Is the team`s mission clearly defined to each team member? (2) Are the goals clearly defined and achievable by all team members? (3) Will empowerment (decision-making power) be given equally to all team members? (4) Will open and honest communication be allowed among teammore » members? (5) Will each team member be respected and valued for his/her position on the team? (6) Are self-directed work teams effectively rewarded for accomplishments? (7) Have team members received adequate training to effectively complete their job tasks? Upon completion of the literature review and statistical data, and after analyzing the seven areas of team building techniques, it was determined three of the four teams were successful and effective. The only area of concern to the organization is that the participants felt they did not have true ownership of their teams; that is, team members were not given full empowerment. According to this study and the review of literature, full empowerment must be given to achieve successful and effective teams. If true empowerment is not given, the team will suffer in other areas of team building, and the organization will lose a valuable tool.« less

  4. Canister Storage Building (CSB) Hazard Analysis Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    POWERS, T.B.

    2000-03-16

    This report describes the methodology used in conducting the Canister Storage Building (CSB) Hazard Analysis to support the final CSB Safety Analysis Report and documents the results. This report describes the methodology used in conducting the Canister Storage Building (CSB) hazard analysis to support the CSB final safety analysis report (FSAR) and documents the results. The hazard analysis process identified hazardous conditions and material-at-risk, determined causes for potential accidents, identified preventive and mitigative features, and qualitatively estimated the frequencies and consequences of specific occurrences. The hazard analysis was performed by a team of cognizant CSB operations and design personnel, safetymore » analysts familiar with the CSB, and technical experts in specialty areas. The material included in this report documents the final state of a nearly two-year long process. Attachment A provides two lists of hazard analysis team members and describes the background and experience of each. The first list is a complete list of the hazard analysis team members that have been involved over the two-year long process. The second list is a subset of the first list and consists of those hazard analysis team members that reviewed and agreed to the final hazard analysis documentation. The material included in this report documents the final state of a nearly two-year long process involving formal facilitated group sessions and independent hazard and accident analysis work. The hazard analysis process led to the selection of candidate accidents for further quantitative analysis. New information relative to the hazards, discovered during the accident analysis, was incorporated into the hazard analysis data in order to compile a complete profile of facility hazards. Through this process, the results of the hazard and accident analyses led directly to the identification of safety structures, systems, and components, technical safety requirements, and other controls required to protect the public, workers, and environment.« less

  5. Concurrent Mission and Systems Design at NASA Glenn Research Center: The Origins of the COMPASS Team

    NASA Technical Reports Server (NTRS)

    McGuire, Melissa L.; Oleson, Steven R.; Sarver-Verhey, Timothy R.

    2012-01-01

    Established at the NASA Glenn Research Center (GRC) in 2006 to meet the need for rapid mission analysis and multi-disciplinary systems design for in-space and human missions, the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team is a multidisciplinary, concurrent engineering group whose primary purpose is to perform integrated systems analysis, but it is also capable of designing any system that involves one or more of the disciplines present in the team. The authors were involved in the development of the COMPASS team and its design process, and are continuously making refinements and enhancements. The team was unofficially started in the early 2000s as part of the distributed team known as Team JIMO (Jupiter Icy Moons Orbiter) in support of the multi-center collaborative JIMO spacecraft design during Project Prometheus. This paper documents the origins of a concurrent mission and systems design team at GRC and how it evolved into the COMPASS team, including defining the process, gathering the team and tools, building the facility, and performing studies.

  6. Evaluating a Chronic Disease Management Improvement Collaboration: Lessons in Design and Implementation Fundamentals.

    PubMed

    Phillips, Kaye; Amar, Claudia; Elicksen-Jensen, Keesa

    2016-01-01

    For the Canadian Foundation for Healthcare Improvement (CFHI), the Atlantic Healthcare Collaboration (AHC) was a pivotal opportunity to build upon its experience and expertise in delivering regional change management training and to apply and refine its evaluation and performance measurement approach. This paper reports on its evaluation principles and approach, as well as the lessons learned as CFHI diligently coordinated and worked with improvement project (IP) teams and a network of stakeholders to design and undertake a suite of evaluative activities. The evaluation generated evidence and learnings about various elements of chronic disease prevention and management (CDPM) improvement processes, individual and team capacity building and the role and value of CFHI in facilitating tailored learning activities and networking among teams, coaches and other AHC stakeholders.

  7. Enhance your team-based qualitative research.

    PubMed

    Fernald, Douglas H; Duclos, Christine W

    2005-01-01

    Qualitative research projects often involve the collaborative efforts of a research team. Challenges inherent in teamwork include changes in membership and differences in analytical style, philosophy, training, experience, and skill. This article discusses teamwork issues and tools and techniques used to improve team-based qualitative research. We drew on our experiences in working on numerous projects of varying, size, duration, and purpose. Through trials of different tools and techniques, expert consultation, and review of the literature, we learned to improve how we build teams, manage information, and disseminate results. Attention given to team members and team processes is as important as choosing appropriate analytical tools and techniques. Attentive team leadership, commitment to early and regular team meetings, and discussion of roles, responsibilities, and expectations all help build more effective teams and establish clear norms. As data are collected and analyzed, it is important to anticipate potential problems from differing skills and styles, and how information and files are managed. Discuss analytical preferences and biases and set clear guidelines and practices for how data will be analyzed and handled. As emerging ideas and findings disperse across team members, common tools (such as summary forms and data grids), coding conventions, intermediate goals or products, and regular documentation help capture essential ideas and insights. In a team setting, little should be left to chance. This article identifies ways to improve team-based qualitative research with more a considered and systematic approach. Qualitative researchers will benefit from further examination and discussion of effective, field-tested, team-based strategies.

  8. Labour saver or building a cohesive interprofessional team? The role of the nurse practitioner within hospitals.

    PubMed

    Hurlock-Chorostecki, Christina; Forchuk, Cheryl; Orchard, Carole; van Soeren, Mary; Reeves, Scott

    2014-05-01

    Nurse practitioners (NP) are employed within hospital interprofessional (IP) teams in several countries worldwide. There have been some efforts to describe the nature of the NP role within IP teams largely focussing on how the role may augment care processes. Here, using a constructivist grounded theory approach, the perceptions of NPs about their role were compared and integrated into a previously published team perspective as the second phase of a larger study. Seventeen hospital-based (HB) NPs across Ontario, Canada, participated in group and individual interviews. The NP perspective substantiated and expanded the previously reported team perspective, resulting in an IP perspective. The three practice foci illustrating role value meaning of this perspective became: evolve NP role and advance the specialty, focus on team working, and hold patient care together. The IP perspective, juxtaposed with an existing contingency approach, revealed that NPs were promoting IP work, predominantly at the collaboration and teamwork levels, and aiding IP team transitions to appropriate forms of IP work. The practice, "focus on team working"' was strongly related to promoting IP work. The findings were consistent with HB NPs enacting a role in building IP team cohesiveness rather than merely acting as a labour saver. This is the first study to align NP and team understanding of HB NP role value using an IP framework.

  9. Excite Kids about Engineering: Design Squad[TM] and Engineer Your Life[TM] Resources Make It Easy

    ERIC Educational Resources Information Center

    Cheng, Jack

    2008-01-01

    The author discusses "Design Squad", a television program designed to introduce students to the engineering process. Each episode tells the story of how two teams tackled a particular challenge. A graphic announces each stage (e.g., brainstorm, design, build, test, and redesign) as the teams construct their solutions. These graphics make visual…

  10. MRP (materiel requirements planning) II education: a team-building experience.

    PubMed

    Iemmolo, G R

    1994-05-01

    Conestoga Wood Specialties, a leader in the woodworking industry, is constantly striving for continuous improvement in manufacturing and service. Recently, the company embarked on a major MRP II education effort that served as a framework for team building. This team building concept has carried over into other aspects related to the business, such as the formalization of the sales and operations planning meeting. At Conestoga Wood, it is recognized that successful team building is necessary to achieve and maintain world-class performance.

  11. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    PubMed Central

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  12. Appreciative Inquiry as an Organizational Development Tool.

    ERIC Educational Resources Information Center

    Martinetz, Charles F.

    2002-01-01

    Defines appreciative inquiry as a change model that uses traditional organizational development processes (team building, strategic planning, business process redesign, management audits) in a new way, both as a philosophy and as a process. Emphasizes collaboration, participation of all voices, and changing the organization rather than the people.…

  13. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    NASA Technical Reports Server (NTRS)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.

  14. Automation and Process Improvement Enables a Small Team to Operate a Low Thrust Mission in Orbit Around the Asteroid Vesta

    NASA Technical Reports Server (NTRS)

    Weise, Timothy M

    2012-01-01

    NASA's Dawn mission to the asteroid Vesta and dwarf planet Ceres launched September 27, 2007 and arrived at Vesta in July of 2011. This mission uses ion propulsion to achieve the necessary delta-V to reach and maneuver at Vesta and Ceres. This paper will show how the evolution of ground system automation and process improvement allowed a relatively small engineering team to transition from cruise operations to asteroid operations while maintaining robust processes. The cruise to Vesta phase lasted almost 4 years and consisted of activities that were built with software tools, but each tool was open loop and required engineers to review the output to ensure consistency. Additionally, this same time period was characterized by the evolution from manually retrieved and reviewed data products to automatically generated data products and data value checking. Furthermore, the team originally took about three to four weeks to design and build about four weeks of spacecraft activities, with spacecraft contacts only once a week. Operations around the asteroid Vesta increased the tempo dramatically by transitioning from one contact a week to three or four contacts a week, to fourteen contacts a week (every 12 hours). This was accompanied by a similar increase in activity complexity as well as very fast turn around activity design and build cycles. The design process became more automated and the tools became closed loop, allowing the team to build more activities without sacrificing rigor. Additionally, these activities were dependent on the results of flight system performance, so more automation was added to analyze the flight data and provide results in a timely fashion to feed the design cycle. All of this automation and process improvement enabled up the engineers to focus on other aspects of spacecraft operations, including spacecraft health monitoring and anomaly resolution.

  15. Relationships and Authentic Collaboration: Perceptions of a Building Leadership Team

    ERIC Educational Resources Information Center

    Conner, Tonya

    2015-01-01

    This research examined perceptions of a Building Leadership Team (BLT) regarding the school climate, collegial relationships, camaraderie, and team-building skills among certified faculty. Participants' perceptions changed from resistance accession once a clear understanding of authentic collaboration developed through five job-embedded…

  16. Communications--The Next Step. P.R.I.D.E. People Retraining for Industry Excellence.

    ERIC Educational Resources Information Center

    Pollak, Ave

    This workplace skills course on communication is designed to build on the communications strategies at work course. The focus of the course is the importance of team building, reaching consensus, and conflict resolution as part of the communication process. Introductory material includes a course outline and course topics. The course consists of…

  17. Promoting Local Ownership: Lessons Learned from Process of Transitioning Clinical Mentoring of HIV Care and Treatment in Ethiopia.

    PubMed

    Kassie, Getnet M; Belay, Teklu; Sharma, Anjali; Feleke, Getachew

    2018-01-01

    Focus on improving access and quality of HIV care and treatment gained acceptance in Ethiopia through the work of the International Training and Education Center for Health. The initiative deployed mobile field-based teams and capacity building teams to mentor health care providers on clinical services and program delivery in three regions, namely Tigray, Amhara, and Afar. Transitioning of the clinical mentoring program (CMP) began in 2012 through capacity building and transfer of skills and knowledge to local health care providers and management. The initiative explored the process of transitioning a CMP on HIV care and treatment to local ownership and documented key lessons learned. A mixed qualitative design was used employing focus group discussions, individual in-depth interviews, and review of secondary data. The participants included regional focal persons, mentors, mentees, multidisciplinary team members, and International Training and Education Center for Health (I-TECH) staff. Three facilities were selected in each region. Data were collected by trained research assistants using customized guides for interviews and with data extraction format. The interviews were recorded and fully transcribed. Open Code software was used for coding and categorizing the data. A total of 16 focus group discussions and 20 individual in-depth interviews were conducted. The critical processes for transitioning a project were: establishment of a mentoring transition task force, development of a roadmap to define steps and directions for implementing the transition, and signing of a memorandum of understanding (MOU) between the respective regional health bureaus and I-TECH Ethiopia to formalize the transition. The elements of implementation included mentorship and capacity building, joint mentoring, supportive supervision, review meetings, and independent mentoring supported by facility-based mechanisms: multidisciplinary team meetings, case-based discussions, and catchment area meetings. The process of transitioning the CMP to local ownership involved signing an MOU, training of mentors, and building capacity of mentoring in each region. The experience shed light on how to transition donor-supported work to local country ownership, with key lessons related to strengthening the structures of regional health bureaus, and other facilities addressing critical issues and ensuring continuity of the facility-based activities.

  18. Longitudinal results of strengthening the parent-team alliance in child semi-residential psychiatry: does team investment make a difference?

    PubMed

    Lamers, Audri; van Nieuwenhuizen, Chijs; Twisk, Jos; de Koning, Erica; Vermeiren, Robert

    2016-01-01

    In a semi-residential setting where children switch daily between treatment and home, establishment of a strong parent-team alliance can be a challenge. The development of alliance with parents and the symptoms of the child might be strengthened by a structured investment of treatment team members. Participants were caregivers and treatment team members of 46 children (6-12 years) who received semi-residential psychiatric treatment. An A-B design was applied, in which the first 22 children were assigned to the comparison group receiving treatment as usual and the next 24 to the experimental group, where treatment team members used additional alliance-building strategies. Alliance and symptom questionnaires were filled out at three-month intervals during both treatment conditions. Parent-treatment team interactions, assessed on DVD, were coded according to members' adherence to these strategies. Multilevel analyses (using MLwiN) showed that based on reports of primary caregivers and a case manager, the alliance-building strategies had a statistically significant effect on the strength of the therapeutic alliance between treatment team members and parents. In addition, primary caregivers in the experimental group reported significant less hyperactivity symptoms of their children. Despite the methodological challenge of examining therapeutic processes in this complex treatment setting, this study supports the benefits of structured investment in the parent-team alliance.

  19. Building new hospitals: a UK infection control perspective.

    PubMed

    Stockley, J M; Constantine, C E; Orr, K E

    2006-03-01

    Infection control input is vital throughout the planning, design and building stages of a new hospital project, and must continue through the commissioning (and decommissioning) process, evaluation and putting the facility into full clinical service. Many hospitals continue to experience problems months or years after occupying the new premises; some of these could have been avoided by infection control involvement earlier in the project. The importance of infection control must be recognized by the chief executive of the hospital trust and project teams overseeing the development. Clinical user groups and contractors must also be made aware of infection control issues. It is vital that good working relationships are built up between the infection control team (ICT) and all these parties. ICTs need the authority to influence the process. This may require their specific recognition by the Private Finance Initiative National Unit, the Department of Health or other relevant authorities. ICTs need training in how to read design plans, how to write effective specifications, and in other areas with which they may be unfamiliar. The importance of documentation and record keeping is paramount. External or independent validation of processes should be available, particularly in commissioning processes. Building design in relation to infection control needs stricter national regulations, allowing ICTs to focus on more local usage issues. Further research is needed to provide evidence regarding the relationship between building design and the prevalence of infection.

  20. Teamwork through Team Building: Face-to-Face to Online

    ERIC Educational Resources Information Center

    Staggers, Julie; Garcia, Susan; Nagelhout, Ed

    2008-01-01

    This article describes the ways the authors incorporated team-building activities into our online business writing courses by interrogating the ways that kinesthetic learning translates into the electronic realm. The authors review foundational theories of team building, including Cog's Ladder and Tuckman's Stages, and offer sample exercises they…

  1. 78 FR 45939 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Whiteland (12-03- Virginia Township team.com/lomrs.htm. 2075P). McMichael, Building, 209 Chairman, East... Tredyffrin (12-03- Michelle H. Municipal team.com/lomrs.htm. 2075P). Kichline, Building, 1100 Chairman... Scott K. York, Building and team.com/lomrs.htm. County (12-03- Chairman-at- Development 1164P). Large...

  2. Team Building in an Online Organizational Behavior Course

    ERIC Educational Resources Information Center

    Grzeda, Maurice; Haq, Rana; LeBrasseur, Rolland

    2008-01-01

    The authors describe the development and delivery of a team-building exercise in an online organizational behavior undergraduate course. Qualitative data of student perceptions, collected at the end of the course, revealed both positive and negative reactions to various aspects of the team-building exercise. Based on these reactions, the authors…

  3. True Collaboration: Building and Maintaining Successful Teams.

    ERIC Educational Resources Information Center

    Pollak, Judy P.; Mills, Rebecca A.

    1997-01-01

    Describes members' responsibilities within effective middle school interdisciplinary teams. States that principals are responsible for hiring, orientation, teacher empowerment, and staff development, while existing team members help new members by building a new team identity and developing collaborative relationships. Asserts that new teachers…

  4. Team development interventions: Evidence-based approaches for improving teamwork.

    PubMed

    Lacerenza, Christina N; Marlow, Shannon L; Tannenbaum, Scott I; Salas, Eduardo

    2018-01-01

    The rate of teamwork and collaboration within the workforce has burgeoned over the years, and the use of teams is projected to continue increasing. With the rise of teamwork comes the need for interventions designed to enhance teamwork effectiveness. Successful teams produce desired outcomes; however, it is critical that team members demonstrate effective processes to achieve these outcomes. Team development interventions (TDIs) increase effective team competencies and processes, thereby leading to improvements in proximal and distal outcomes. The effectiveness of TDIs is evident across domains (e.g., education, health care, military, aviation), and they are applicable in a wide range of settings. To stimulate the adoption and effective use of TDIs, the current article provides a review of four types of evidence-based TDIs including team training, leadership training, team building, and team debriefing. In doing so, we aim to provide psychologists with an understanding of the scientific principles underlying TDIs and their impact on team dynamics. Moreover, we provide evidence-based recommendations regarding how to increase the effectiveness of TDIs as well as a discussion on future research needed within this domain. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  5. The communication in industrialised building system (IBS) construction project: Virtual environment

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  6. Scheduling System Assessment, and Development and Enhancement of Re-engineered Version of GPSS

    NASA Technical Reports Server (NTRS)

    Loganantharaj, Rasiah; Thomas, Bushrod; Passonno, Nicole

    1996-01-01

    The objective of this project is two-fold. First to provide an evaluation of a commercially developed version of the ground processing scheduling system (GPSS) for its applicability to the Kennedy Space Center (KSC) ground processing problem. Second, to work with the KSC GPSS development team and provide enhancement to the existing software. Systems reengineering is required to provide a sustainable system for the users and the software maintenance group. Using the LISP profile prototype code developed by the GPSS reverse reengineering groups as a building block, we have implemented the resource deconfliction portion of GPSS in common LISP using its object oriented features. The prototype corrects and extends some of the deficiencies of the current production version, plus it uses and builds on the classes from the development team's profile prototype.

  7. The Destructive Impact of a Positive Team-Building Intervention.

    ERIC Educational Resources Information Center

    Boss, R. Wayne; McConkie, Mark L.

    1981-01-01

    Examines a confrontation team-building intervention that was highly successful in building the supervisors into a unified group. Evaluation indicated the team became the most important variable with little consideration given to the rest of the organization, resulting in the whole organization being severely crippled and having to be rebuilt.…

  8. 78 FR 52946 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ........ 170158 Schaumburg (13-05- Larson, Municipal team.com/starr/LOMR/ 1146P). President, Building, Pages...... 440018 (12-01-1131P). Joseph M. Department of team.com/starr/LOMR/ Polisena, Mayor, Building Pages/Region..., Building, 410 team.com/starr/LOMR/ County (12-05- County Executive, South Walnut Pages/RegionV.aspx. 6032P...

  9. Development of Program to Enhance Team Building Leadership Skills of Primary School Administrators

    ERIC Educational Resources Information Center

    Sairam, Boonchauy; Sirisuthi, Chaiyuth; Wisetrinthong, Kanjana

    2017-01-01

    Team building leadership skills are important to understandings of how the primary school administrators might work towards creating more effective teamwork in the school. This research aimed 1) to study the components of team building leadership skills needed for primary school administrators, 2) to examine the current states and desirable…

  10. Trying To Build a Team? Get Them Involved!

    ERIC Educational Resources Information Center

    Roda, Julie; And Others

    This paper summarizes knowledge about team building acquired from participation in a Michigan Adult Education Practitioners Inquiry Project. The first step in team building is to understand the dynamics of the entire group and to identify the unique traits of each member. The paper describes techniques and activities for enhancing communication,…

  11. An Egg-Centric Approach to Teaching Strategic Types: Adapting a Classic Exercise

    ERIC Educational Resources Information Center

    Warner, Alfred G.

    2005-01-01

    This article introduces a variation on the egg-drop exercise to generate active understanding of strategic choice by firms. Teams are challenged to design, build, and price devices for protecting an egg from a 20-foot drop. The materials are purchased in a bidding process that builds in asymmetries in resources, costs, and finished designs. Teams…

  12. Communication skills to develop trusting relationships on global virtual engineering capstone teams

    NASA Astrophysics Data System (ADS)

    Zaugg, Holt; Davies, Randall S.

    2013-05-01

    As universities seek to provide cost-effective, cross-cultural experiences using global virtual (GV) teams, the 'soft' communication skills typical of all teams, increases in importance for GV teams. Students need to be taught how to navigate through cultural issues and virtual tool issues to build strong trusting relationships with distant team members. Weekly team meetings provide an excellent opportunity to observe key team interactions that facilitate relationship and trust-building among team members. This study observed the weekly team meetings of engineering students attending two US universities and one Asian university as they collaborated as a single GV capstone GV team. In addition local team members were interviewed individually and collectively throughout the project to determine strategies that facilitated team relations and trust. Findings indicate the importance of student choice of virtual communication tools, the refining of communication practices, and specific actions to build trusting relationships. As student developed these attributes, collaboration and success was experienced on this GV team.

  13. Complex collaborative problem-solving processes in mission control.

    PubMed

    Fiore, Stephen M; Wiltshire, Travis J; Oglesby, James M; O'Keefe, William S; Salas, Eduardo

    2014-04-01

    NASA's Mission Control Center (MCC) is responsible for control of the International Space Station (ISS), which includes responding to problems that obstruct the functioning of the ISS and that may pose a threat to the health and well-being of the flight crew. These problems are often complex, requiring individuals, teams, and multiteam systems, to work collaboratively. Research is warranted to examine individual and collaborative problem-solving processes in this context. Specifically, focus is placed on how Mission Control personnel-each with their own skills and responsibilities-exchange information to gain a shared understanding of the problem. The Macrocognition in Teams Model describes the processes that individuals and teams undertake in order to solve problems and may be applicable to Mission Control teams. Semistructured interviews centering on a recent complex problem were conducted with seven MCC professionals. In order to assess collaborative problem-solving processes in MCC with those predicted by the Macrocognition in Teams Model, a coding scheme was developed to analyze the interview transcriptions. Findings are supported with excerpts from participant transcriptions and suggest that team knowledge-building processes accounted for approximately 50% of all coded data and are essential for successful collaborative problem solving in mission control. Support for the internalized and externalized team knowledge was also found (19% and 20%, respectively). The Macrocognition in Teams Model was shown to be a useful depiction of collaborative problem solving in mission control and further research with this as a guiding framework is warranted.

  14. Team-Building Activities in Dance Classes and Discoveries from Reflective Essays

    ERIC Educational Resources Information Center

    Hanrahan, Stephanie J.; Pedro, Rachel A.

    2017-01-01

    The purpose of this study was to determine students' perceptions of team-building activities within a university Latin dance course. Students (N = 30) completed an evaluation of the team-building activities and wrote reflective essays about their experiences in the course. The course consisted of twenty 90-minute classes. In the third class…

  15. Envisioning successful teamwork: An exploratory qualitative study of team processes used by nursing teams in a paediatric hospital unit.

    PubMed

    Whitehair, Leeann; Hurley, John; Provost, Steve

    2018-06-12

    To explore how team processes support nursing teams in hospital units during every day work. Due to their close proximity to patients, nurses are central to the process of maintaining patient safety. Globally, changes in models of care delivery by nurses, inclusive of team nursing are being considered. This qualitative study used purposive sampling in a single hospital and participants were nurses employed to work on a paediatric unit. Data was collected using non-participant observation. Thematic analysis was used to analyse and code data to create themes. Three clear themes emerged. Theme 1:"We are a close knit team"; Behaviours building a successful team"- outlines expectations regarding how members are to behave when establishing, nurturing and managing a team. Theme 2: "Onto it"; Ways of interacting with each other" - Identifies the expected pattern of relating within the team which contribute to shared understanding and actions. Theme 3: "No point in second guessing"; Maintaining a global view of the unit" - focuses on the processes for monitoring and reporting signals that team performance is on course or breaking down and includes accepting responsibility to lead the team and team members having a widespread sensitivity to what needs to happen. Essential to successful teamwork is the interplay and mutuality of team members and team leaders. Leadership behaviours exhibited in this study provide useful insights to how informal and shared or distributed leadership of teams may be achieved. Without buy-in from team members, teams may not achieve successful desired outcomes. It is not sufficient for teams to rely on current successful outcomes, as they need to be on the look-out for new ways to ensure that they can anticipate possible risks or threats to the team before harm is done. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  16. An evaluation of the 'Designated Research Team' approach to building research capacity in primary care.

    PubMed

    Cooke, Jo; Nancarrow, Susan; Dyas, Jane; Williams, Martin

    2008-06-27

    This paper describes an evaluation of an initiative to increase the research capability of clinical groups in primary and community care settings in a region of the United Kingdom. The 'designated research team' (DRT) approach was evaluated using indicators derived from a framework of six principles for research capacity building (RCB) which include: building skills and confidence, relevance to practice, dissemination, linkages and collaborations, sustainability and infrastructure development. Information was collated on the context, activities, experiences, outputs and impacts of six clinical research teams supported by Trent Research Development Support Unit (RDSU) as DRTs. Process and outcome data from each of the teams was used to evaluate the extent to which the DRT approach was effective in building research capacity in each of the six principles (as evidenced by twenty possible indicators of research capacity development). The DRT approach was found to be well aligned to the principles of RCB and generally effective in developing research capabilities. It proved particularly effective in developing linkages, collaborations and skills. Where research capacity was slow to develop, this was reflected in poor alignment between the principles of RCB and the characteristics of the team, their activities or environment. One team was unable to develop a research project and the funding was withdrawn at an early stage. For at least one individual in each of the remaining five teams, research activity was sustained beyond the funding period through research partnerships and funding successes. An enabling infrastructure, including being freed from clinical duties to undertake research, and support from senior management were found to be important determinants of successful DRT development. Research questions of DRTs were derived from practice issues and several projects generated outputs with potential to change daily practice, including the use of research evidence in practice and in planning service changes. The DRT approach was effective at RCB in teams situated in a supportive organisation and in particular, where team members could be freed from clinical duties and management backing was strong. The developmental stage of the team and the research experience of constituent members also appeared to influence success. The six principles of RCB were shown to be useful as a framework for both developing and evaluating RCB initiatives.

  17. Delivering Coordinated Cancer Care by Building Transactive Memory in a Team of Teams.

    PubMed

    Henry, Elizabeth; Silva, Abigail; Tarlov, Elizabeth; Czerlanis, Cheryl; Bernard, Margie; Chauhan, Cynthia; Schalk, Denise; Stewart, Greg

    2016-11-01

    Cancer care delivery is highly complex. Treatment involves coordination within oncology health-care teams and across other teams of referring primary and specialty providers (a team of teams). Each team interfaces with patients and caregivers to offer component parts of comprehensive care. Because patients frequently obtain specialty care from divergent health-care systems resulting in cross-system health-care use, oncology teams need mechanisms to coordinate and collaborate within and across health-care systems to optimize clinical outcomes for all cancer patients. Transactive memory is one potential strategy that can help improve comprehensive patient care delivery. Transactive memory is a process by which two or more team professionals develop a shared system for encoding, storing, and retrieving information. Each professional is responsible for retaining only part of the total information. Applying this concept to a team of teams results in system benefits wherein all teams share an understanding of specialized knowledge held by each component team. The patient's role as the unifying member of the team of teams is central to successful treatment delivery. This clinical case presents a patient who is receiving oral treatment for advanced prostate cancer within two health systems. The case emphasizes the potential for error when multiple teams function without a point team (the team coordinating efforts of all other primary and specialty teams) and when the specialty knowledge of providers and patients is not well integrated into all phases of the care delivery process.

  18. Atrium building study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-01-01

    The CIGNA design team was faced with creating a new 500,000 square foot office building on a pastoral 610 acre corporate campus in Bloomfield, Connecticut, just outside of Hartford. Challenges abounded during the design process, from the selection of a specific building site on the sprawling campus to the evolution of a building form incorporating an atrium, to the selection of building systems and materials, to the design to the office interiors and atrium landscape. This document summarizes the original design problem, focusing on design criteria and performance standards that led to the decision to design an atrium building asmore » well as decision concerning its function, its form, its building systems and materials, and its passive energy strategies.« less

  19. Teamwork in perioperative nursing. Understanding team development, effectiveness, evaluation.

    PubMed

    Farley, M J

    1991-03-01

    Teams are an essential part of perioperative nursing practice. Nurses who have a knowledge of teamwork and experience in working on teams have a greater understanding of the processes and problems involved as teams develop from new, immature teams to those that are mature and effective. This understanding will assist nurses in helping their teams achieve a higher level of productivity, and members will be more satisfied with team efforts. Team development progresses through several stages. Each stage has certain characteristics and desired outcomes. At each stage, team members and leaders have certain responsibilities. Team growth does not take place automatically and inevitably, but as a consequence of conscious and unconscious efforts of its leader and members to solve problems and satisfy needs. Building and maintaining a team is certainly work, but work that brings a great deal of satisfaction and feelings of pride in accomplishment. According to I Tenzer, RN, MS, teamwork "is not a panacea; it is a viable approach to developing a hospital's most valuable resource--people."

  20. "Yes, we can!" review on team confidence in sports.

    PubMed

    Fransen, Katrien; Mertens, Niels; Feltz, Deborah; Boen, Filip

    2017-08-01

    During the last decade, team confidence has received more and more attention in the sport psychology literature. Research has demonstrated that athletes who are more confident in their team's abilities exert more effort, set more challenging goals, are more resilient when facing adversities, and ultimately perform better. This article reviews the existing literature in order to provide more clarity in terms of the conceptualization and the operationalization of team confidence. We thereby distinguish between collective efficacy (i.e., process-oriented team confidence) and team outcome confidence (i.e., outcome-oriented team confidence). In addition, both the sources as well as the outcomes of team confidence will be discussed. Furthermore, we will go deeper into the dispersion of team confidence and we will evaluate the current guidelines on how to measure both types of team confidence. Building upon this base, the article then highlights interesting avenues for future research in order to further improve both our theoretical knowledge on team confidence and its application to the field. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Yixing; Zhang, Jianshun; Pelken, Michael

    Executive Summary The objective of this study was to develop a “Virtual Design Studio (VDS)”: a software platform for integrated, coordinated and optimized design of green building systems with low energy consumption, high indoor environmental quality (IEQ), and high level of sustainability. This VDS is intended to assist collaborating architects, engineers and project management team members throughout from the early phases to the detailed building design stages. It can be used to plan design tasks and workflow, and evaluate the potential impacts of various green building strategies on the building performance by using the state of the art simulation toolsmore » as well as industrial/professional standards and guidelines for green building system design. Engaged in the development of VDS was a multi-disciplinary research team that included architects, engineers, and software developers. Based on the review and analysis of how existing professional practices in building systems design operate, particularly those used in the U.S., Germany and UK, a generic process for performance-based building design, construction and operation was proposed. It distinguishes the whole process into five distinct stages: Assess, Define, Design, Apply, and Monitoring (ADDAM). The current VDS is focused on the first three stages. The VDS considers building design as a multi-dimensional process, involving multiple design teams, design factors, and design stages. The intersection among these three dimensions defines a specific design task in terms of “who”, “what” and “when”. It also considers building design as a multi-objective process that aims to enhance the five aspects of performance for green building systems: site sustainability, materials and resource efficiency, water utilization efficiency, energy efficiency and impacts to the atmospheric environment, and IEQ. The current VDS development has been limited to energy efficiency and IEQ performance, with particular focus on evaluating thermal performance, air quality and lighting environmental quality because of their strong interaction with the energy performance of buildings. The VDS software framework contains four major functions: 1) Design coordination: It enables users to define tasks using the Input-Process-Output flow approach, which specifies the anticipated activities (i.e., the process), required input and output information, and anticipated interactions with other tasks. It also allows task scheduling to define the work flow, and sharing of the design data and information via the internet. 2) Modeling and simulation: It enables users to perform building simulations to predict the energy consumption and IEQ conditions at any of the design stages by using EnergyPlus and a combined heat, air, moisture and pollutant simulation (CHAMPS) model. A method for co-simulation was developed to allow the use of both models at the same time step for the combined energy and indoor air quality analysis. 3) Results visualization: It enables users to display a 3-D geometric design of the building by reading BIM (building information model) file generated by design software such as SketchUp, and the predicted results of heat, air, moisture, pollutant and light distributions in the building. 4) Performance evaluation: It enables the users to compare the performance of a proposed building design against a reference building that is defined for the same type of buildings under the same climate condition, and predicts the percent of improvements over the minimum requirements specified in ASHRAE Standard 55-2010, 62.1-2010 and 90.1-2010. An approach was developed to estimate the potential impact of a design factor on the whole building performance, and hence can assist the user to identify areas that have most pay back for investment. The VDS software was developed by using C++ with the conventional Model, View and Control (MVC) software architecture. The software has been verified by using a simple 3-zone case building. The application of the VDS concepts and framework for building design and performance analysis has been illustrated by using a medium-sized, five story office building that received LEED Platinum Certification from USGBC.« less

  2. A season-long team-building intervention: examining the effect of team goal setting on cohesion.

    PubMed

    Senécal, Julie; Loughead, Todd M; Bloom, Gordon A

    2008-04-01

    The purpose of the current study was to determine whether the implementation of a season-long team-building intervention program using team goal setting increased perceptions of cohesion. The participants were 86 female high school basketball players from 8 teams. The teams were randomly assigned to either an experimental team goal-setting or control condition. Each participant completed the Group Environment Questionnaire (GEQ; Carron, Brawley, & Widmeyer, 2002; Carron, Widmeyer, & Brawley, 1985), which assessed cohesion at both the beginning and end of the season. Overall, the results revealed a significant multivariate effect, Pillai's trace F(12, 438) = 2.68, p = .002. Post hoc analyses showed that at the beginning of the season, athletes from both conditions did not differ in their perceptions of cohesion. However, at the end of the season, athletes in the team goal-setting condition held higher perceptions of cohesion than athletes in the control condition. Overall, the results indicated that team goal setting was an effective team-building tool for influencing cohesiveness in sport teams.

  3. Artificial intelligence support for scientific model-building

    NASA Technical Reports Server (NTRS)

    Keller, Richard M.

    1992-01-01

    Scientific model-building can be a time-intensive and painstaking process, often involving the development of large and complex computer programs. Despite the effort involved, scientific models cannot easily be distributed and shared with other scientists. In general, implemented scientific models are complex, idiosyncratic, and difficult for anyone but the original scientific development team to understand. We believe that artificial intelligence techniques can facilitate both the model-building and model-sharing process. In this paper, we overview our effort to build a scientific modeling software tool that aids the scientist in developing and using models. This tool includes an interactive intelligent graphical interface, a high-level domain specific modeling language, a library of physics equations and experimental datasets, and a suite of data display facilities.

  4. Multiple Dimensions to the Application for the Effectiveness of Team Building in ROTC

    ERIC Educational Resources Information Center

    Chen, Yin-Che; Chen, Yun-Chi; Tsao, Ya-Lun

    2009-01-01

    Team building has been given increasing attention and applied in diverse disciplines in recent years. The purpose of this study was to determine the multiple dimensions to the application for the effectiveness of team building in the military units such as ROTC since not many existing literature has investigated this in such an expectedly high…

  5. Developing a Master Plan for Your School. School Buildings Planning, Design, and Construction Series No. 1.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…

  6. Building an Electronic Handover Tool for Physicians Using a Collaborative Approach between Clinicians and the Development Team.

    PubMed

    Guilbeault, Peggy; Momtahan, Kathryn; Hudson, Jordan

    2015-01-01

    In an effort by The Ottawa Hospital (TOH) to become one of the top 10% performers in patient safety and quality of care, the hospital embarked on improving the communication process during handover between physicians by building an electronic handover tool. It is expected that this tool will decrease information loss during handover. The Information Systems (IS) department engaged a workgroup of physicians to become involved in defining requirements to build an electronic handover tool that suited their clinical handover needs. This group became ultimately responsible for defining the graphical user interface (GUI) and all functionality related to the tool. Prior to the pilot, the Information Systems team will run a usability testing session to ensure the application is user friendly and has met the goals and objectives of the workgroup. As a result, The Ottawa Hospital has developed a fully integrated electronic handover tool built on the Clinical Mobile Application (CMA) which allows clinicians to enter patient problems, notes and tasks available to all physicians to facilitate the handover process.

  7. Building Statewide Infrastructure for the Academic Support of Students With Mild Traumatic Brain Injury.

    PubMed

    Gioia, Gerard A; Glang, Ann E; Hooper, Stephen R; Brown, Brenda Eagan

    To focus attention on building statewide capacity to support students with mild traumatic brain injury (mTBI)/concussion. Consensus-building process with a multidisciplinary group of clinicians, researchers, policy makers, and state Department of Education personnel. The white paper presents the group's consensus on the essential components of a statewide educational infrastructure to support the management of students with mTBI. The nature and recovery process of mTBI are briefly described specifically with respect to its effects on school learning and performance. State and local policy considerations are then emphasized to promote implementation of a consistent process. Five key components to building a statewide infrastructure for students with mTBI are described including (1) definition and training of the interdisciplinary school team, (2) professional development of the school and medical communities, (3) identification, assessment, and progress monitoring protocols, (4) a flexible set of intervention strategies to accommodate students' recovery needs, and (5) systematized protocols for active communication among medical, school, and family team members. The need for a research to guide effective program implementation is stressed. This guiding framework strives to assist the development of support structures for recovering students with mTBI to optimize academic outcomes. Until more evidence is available on academic accommodations and other school-based supports, educational systems should follow current best practice guidelines.

  8. Checklist of Library Building Design Considerations.

    ERIC Educational Resources Information Center

    Sannwald, William W., Ed.; Smith, Robert S., Ed.

    This checklist is designed to provide librarians, architects, and other members of a building design team with a list of questions to ask during the design phase of a new or remodeled library building project. The purpose of the questions is to make sure that no element of the building is overlooked by the building design team in their programming…

  9. Bringing interdisciplinary and multicultural team building to health care education: the downstate team-building initiative.

    PubMed

    Hope, Joanie Mayer; Lugassy, Daniel; Meyer, Rina; Jeanty, Freida; Myers, Stephanie; Jones, Sadie; Bradley, Joann; Mitchell, Rena; Cramer, Eva

    2005-01-01

    To evaluate the impact of the Downstate Team-Building Initiative (DTBI), a model multicultural and interdisciplinary health care team-building program for health professions students. A total of 65 students representing seven health disciplines participated in DTBI's first three years (one cohort per year since implementation). During the 18-session curriculum, students self-evaluated their group's progress through Tuckman's four team-development stages (FORMING, STORMING, NORMING, PERFORMING) on an 11-point scale. Students completed matched pre- and postintervention program evaluations assessing five variables: interdisciplinary understanding, interdisciplinary attitudes, teamwork skills, multicultural skills, and team atmosphere. After participation, students completed narrative follow-up questionnaires investigating impact one and two years after program completion. Each year's team development curve followed a similar logarithmic trajectory. Cohort 1 remained in team development stage 3 (NORMING) while Cohorts 2 and 3 advanced into the final stage-PERFORMING. A total of 34 matched pre- and postintervention evaluations showed significant change in all major variables: Team atmosphere and group teamwork skills improved most (48% and 44%, respectively). Interdisciplinary understanding improved 42%. Individual multicultural skills (defined by ability to address racism, homophobia, and sexism) started at the highest baseline and improved the least (13%). Group multicultural skills improved 36%. Of 23 responses to the follow-up surveys, 22 (96%) stated DTBI was a meaningful educational experience applicable to their current clinical surroundings. DTBI successfully united students across health discipline, ethnicity, socioeconomic class, gender, and sexual orientation into functioning teams. The model represents an effective approach to teaching health care team building and demonstrates benefits in both preclinical and clinical years of training.

  10. Simulation in the Service of Design - Asking the Right Questions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donn, Michael; Selkowitz, Stephen; Bordass, Bill

    2009-03-01

    This paper proposes an approach to the creation of design tools that address the real information needs of designers in the early stages of design of nonresidential buildings. Traditional simplified design tools are typically too limited to be of much use, even in conceptual design. The proposal is to provide access to the power of detailed simulation tools, at a stage in design when little is known about the final building, but at a stage also when the freedom to explore options is greatest. The proposed approach to tool design has been derived from consultation with design analysis teams asmore » part of the COMFEN tool development. The paper explores how tools like COMFEN have been shaped by this consultation and how requests from these teams for real-world relevance might shape such tools in the future, drawing into the simulation process the lessons from Post Occupancy Evaluation (POE) of buildings.« less

  11. 78 FR 14565 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ..., Building and team.com/lomrs.htm. County (12-03- Chairman at Development 1200P). Large, Loudoun Department... D. Public Works, team.com/lomrs.htm. 2078P). Sessoms, Jr., Municipal Center, Mayor, City of Building... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes...

  12. 77 FR 59953 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... areas of Terry L. Baker, Administration team.com/lomrs.htm. Washington County President, Building, 100... Jackson Township http://www.rampp- November 26, 2012.... 421805 (12-03-0843P). O. Moyer, Building, 60 team... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes...

  13. 78 FR 48885 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...- August 12, 2013...... 420713 Whitpain (12-03- Joseph J. Palmer, Building, 960 team.com/lomrs.htm. 1849P... team.com/lomrs.htm. City of Sachse, Department, 5560 3815 Sachse Road, Highway 78, Building B, Sachse... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes...

  14. 9. BUILDING 65 ADDITION. LASER SAFETY TEAM. FLOOR PLAN, ELEVATIONS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. BUILDING 65 ADDITION. LASER SAFETY TEAM. FLOOR PLAN, ELEVATIONS, ETC. March 21, 1973 - Frankford Arsenal, Building No. 65, South of Tacony Street between Bridge Street & tracks of former Pennsylvania Railroad, Philadelphia, Philadelphia County, PA

  15. NIE's Study of Minimum Competency Testing: A Process for the Clarification of Issues.

    ERIC Educational Resources Information Center

    Herndon, Enid

    The National Institute of Education's (NIE) process of studying minimum competency testing (MCT) includes: (1) a clarification hearing to provide a public forum to discuss divergent views on salient issues related to MCT programs; (2) two investigative teams to explore the different perspectives on the issues, build comprehensive cases which…

  16. Towards Online Delivery of Process-Oriented Guided Inquiry Learning Techniques in Information Technology Courses

    ERIC Educational Resources Information Center

    Trevathan, Jarrod; Myers, Trina

    2013-01-01

    Process-Oriented Guided Inquiry Learning (POGIL) is a technique used to teach in large lectures and tutorials. It invokes interaction, team building, learning and interest through highly structured group work. Currently, POGIL has only been implemented in traditional classroom settings where all participants are physically present. However,…

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Achieving aggressive energy efficiency targets requires tight coordination and clear communication among owners, designers, builders, and subcontractors. For this townhome project, MassDevelopment, the quasi-governmental agency owner, selected Metric Development of Boston, teaming with Building America team Consortium for Advanced Residential Buildings (CARB) and Cambridge Seven Architects, to build very high performing market-rate homes. Fort Devens is part of a decommissioned army base in working-class Harvard, Massachusetts, approximately one hour northwest of Boston. The team proposed 12 net zero energy-ready townhomes that were also designed to achieve a Home Energy Rating System (HERS) Index Score of 41 before adding renewables. Themore » team carefully planned the site to maximize solar access, daylighting, and efficient building forms.« less

  18. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  19. Employee empowerment through team building and use of process control methods.

    PubMed

    Willems, S

    1998-02-01

    The article examines the use of statistical process control and performance improvement techniques in employee empowerment. The focus is how these techniques provide employees with information to improve their productivity and become involved in the decision-making process. Findings suggest that at one Mississippi hospital employee improvement has had a positive effect on employee productivity, morale, and quality of work.

  20. Applying organizational science to health care: a framework for collaborative practice.

    PubMed

    Dow, Alan W; DiazGranados, Deborah; Mazmanian, Paul E; Retchin, Sheldon M

    2013-07-01

    Developing interprofessional education (IPE) curricula that improve collaborative practice across professions has proven challenging. A theoretical basis for understanding collaborative practice in health care settings is needed to guide the education and evaluation of health professions trainees and practitioners and support the team-based delivery of care. IPE should incorporate theory-driven, evidence-based methods and build competency toward effective collaboration.In this article, the authors review several concepts from the organizational science literature and propose using these as a framework for understanding how health care teams function. Specifically, they outline the team process model of action and planning phases in collaborative work; discuss leadership and followership, including how locus (a leader's integration into a team's usual work) and formality (a leader's responsibility conferred by the traditional hierarchy) affect team functions; and describe dynamic delegation, an approach to conceptualizing escalation and delegation within health care teams. For each concept, they identify competencies for knowledge, attitudes, and behaviors to aid in the development of innovative curricula to improve collaborative practice. They suggest that gaining an understanding of these principles will prepare health care trainees, whether team leaders or members, to analyze team performance, adapt behaviors that improve collaboration, and create team-based health care delivery processes that lead to improved clinical outcomes.

  1. The process of end-of-life care delivery to the families of elderly patients according to the Family Health Strategy.

    PubMed

    Silva, Lucía; Poles, Kátia; Baliza, Michelle Freire; dos Santos Ribeiro Silva, Mariana Cristina Lobato; dos Santos, Maiara Rodrigues; Bousso, Regina Szylit

    2013-02-01

    To understand the process of end-of-life care delivery to the families of elderly patients according to a Family Health Strategy (FHS) team, to identify the meanings the team attributes to the experience and to build a theoretical model. Symbolic Interactionism and Grounded Theory were applied. Fourteen professionals working in an FHS located in a country town in the state of São Paulo were interviewed. Through comparative analysis, the core category overcoming challenges to assist the family and the elderly during the dying process was identified, and it was composed of the following sub-processes: Identifying situational problems, Planning a new care strategy, Managing the care and Evaluating the care process. the team faces difficulties to achieve better performance in attending to the biological and emotional needs of families, seeking to ensure dignity to the elderly at the end of their lives and expand access to healthcare.

  2. Increasing Flexibility in Energy Code Compliance: Performance Packages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hart, Philip R.; Rosenberg, Michael I.

    Energy codes and standards have provided significant increases in building efficiency over the last 38 years, since the first national energy code was published in late 1975. The most commonly used path in energy codes, the prescriptive path, appears to be reaching a point of diminishing returns. As the code matures, the prescriptive path becomes more complicated, and also more restrictive. It is likely that an approach that considers the building as an integrated system will be necessary to achieve the next real gains in building efficiency. Performance code paths are increasing in popularity; however, there remains a significant designmore » team overhead in following the performance path, especially for smaller buildings. This paper focuses on development of one alternative format, prescriptive packages. A method to develop building-specific prescriptive packages is reviewed based on a multiple runs of prototypical building models that are used to develop parametric decision analysis to determines a set of packages with equivalent energy performance. The approach is designed to be cost-effective and flexible for the design team while achieving a desired level of energy efficiency performance. A demonstration of the approach based on mid-sized office buildings with two HVAC system types is shown along with a discussion of potential applicability in the energy code process.« less

  3. Connected Building Challenge – Seattle Demonstration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Nora; Khamphanchai, Warodom; Chotibhongs, Tony

    2016-11-07

    PNNL's first-ever innovation challenge invited teams to leverage PNNL's VOLTTRON technology to create solutions that advance the growth of the smart building market. Five teams presented their solutions at Seattle's Smart Buildings Center in early August 2016. This video summarizes the event.

  4. Juggling Act: Re-Planning and Building on Observatory...Simultaneously!

    NASA Technical Reports Server (NTRS)

    Zavala, Eddie; Daws, Patricia

    2011-01-01

    SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.

  5. Connected Building Challenge – Seattle Demonstration

    ScienceCinema

    Wang, Nora; Khamphanchai, Warodom; Chotibhongs, Tony; Hjortland, Andrew; David, Nigel; Bao, Han; Huang, Da-Wei; Shillingford, Kirk; Gutierrez, Lourdes; Kapadia, Priyank; Hagerman, Joe

    2018-06-13

    PNNL's first-ever innovation challenge invited teams to leverage PNNL's VOLTTRON technology to create solutions that advance the growth of the smart building market. Five teams presented their solutions at Seattle's Smart Buildings Center in early August 2016. This video summarizes the event.

  6. Multigenerational Challenges: Team-Building for Positive Clinical Workforce Outcomes

    PubMed

    Moore, Jill M; Everly, Marcee; Bauer, Renee

    2016-05-31

    Patient acuity in hospital settings continues to increase, and there is greater emphasis on patient outcomes. The current nursing workforce is comprised of four distinct generational cohorts that include veterans, baby boomers, millennials, and generation Xers. Each group has unique characteristics that add complexity to the workforce and this can add challenges to providing optimal patient care. Team building is one strategy to increase mutual understanding, communication, and respect, and thus potentially improve patient outcomes. In this article, we first briefly define generational cohorts by characteristics, and discuss differing expectations for work/life balance and potential negative outcomes. Our discussion offers team building strategies for positive outcomes, a case scenario, and concludes with resources for team building and organizational opportunities.

  7. The Heinz Electronic Library Interactive Online System (HELIOS): Building a Digital Archive Using Imaging, OCR, and Natural Language Processing Technologies.

    ERIC Educational Resources Information Center

    Galloway, Edward A.; Michalek, Gabrielle V.

    1995-01-01

    Discusses the conversion project of the congressional papers of Senator John Heinz into digital format and the provision of electronic access to these papers by Carnegie Mellon University. Topics include collection background, project team structure, document processing, scanning, use of optical character recognition software, verification…

  8. Building the infrastructure: the effects of role identification behaviors on team cognition development and performance.

    PubMed

    Pearsall, Matthew J; Ellis, Aleksander P J; Bell, Bradford S

    2010-01-01

    The primary purpose of this study was to extend theory and research regarding the emergence of mental models and transactive memory in teams. Utilizing Kozlowski, Gully, Nason, and Smith's (1999) model of team compilation, we examined the effect of role identification behaviors and posited that such behaviors represent the initial building blocks of team cognition during the role compilation phase of team development. We then hypothesized that team mental models and transactive memory would convey the effects of these behaviors onto team performance in the team compilation phase of development. Results from 60 teams working on a command-and-control simulation supported our hypotheses. Copyright 2009 APA, all rights reserved.

  9. Team-Building Success: It's in the Cards

    ERIC Educational Resources Information Center

    Scarfino, Deborah; Roever, Carol

    2009-01-01

    Successful team outcomes frequently--if not always--rely upon proven techniques for managing diverse styles and strengths. In this article, the authors describe the Diversity Card Game and the benefits it offers for students and instructors. Building teams using Diversity gives students the knowledge to manage clashes that might otherwise create…

  10. The Montana ALE (Autonomous Lunar Excavator) Systems Engineering Report

    NASA Technical Reports Server (NTRS)

    Hull, Bethanne J.

    2012-01-01

    On May 2 1-26, 20 12, the third annual NASA Lunabotics Mining Competition will be held at the Kennedy Space Center in Florida. This event brings together student teams from universities around the world to compete in an engineering challenge. Each team must design, build and operate a robotic excavator that can collect artificial lunar soil and deposit it at a target location. Montana State University, Bozeman, is one of the institutions selected to field a team this year. This paper will summarize the goals of MSU's lunar excavator project, known as the Autonomous Lunar Explorer (ALE), along with the engineering process that the MSU team is using to fulfill these goals, according to NASA's systems engineering guidelines.

  11. Quantifying Impacts of Urban Growth Potential on Army Training Capabilities

    DTIC Science & Technology

    2017-09-12

    Capacity” ERDC/CERL TR-17-34 ii Abstract Building on previous studies of urban growth and population effects on U.S. military installations and...combat team studies . CAA has developed an iterative process that builds on Military Value Anal- ysis (MVA) models that include a set of attributes that...Methods and tools were developed to support a nationwide analysis. This study focused on installations operating training areas that were high

  12. Applying Organizational Science to Health Care: A Framework for Collaborative Practice

    PubMed Central

    Dow, Alan W.; DiazGranados, Deborah; Mazmanian, Paul E.; Retchin, Sheldon M.

    2013-01-01

    Developing interprofessional education (IPE) curricula that improve collaborative practice across professions has proven challenging. A theoretical basis for understanding collaborative practice in health care settings is needed to guide the education and evaluation of health professions trainees and practitioners and support the team-based delivery of care. IPE should incorporate theory-driven, evidence-based methods and build competency toward effective collaboration. In this article, the authors review several concepts from the organizational science literature and propose using these as a framework for understanding how health care teams function. Specifically, they outline the team process model of action and planning phases in collaborative work; discuss leadership and followership, including how locus (a leader’s integration into a team’s usual work) and formality (a leader’s responsibility conferred by the traditional hierarchy) affect team functions; and describe dynamic delegation, an approach to conceptualizing escalation and delegation within health care teams. For each concept, they identify competencies for knowledge, attitudes, and behaviors to aid in the development of innovative curricula to improve collaborative practice. They suggest that gaining an understanding of these principles will prepare health care trainees, whether team leaders or members, to analyze team performance, adapt behaviors that improve collaboration, and create team-based health care delivery processes that lead to improved clinical outcomes. PMID:23702530

  13. Optimizing Energy Consumption in Building Designs Using Building Information Model (BIM)

    NASA Astrophysics Data System (ADS)

    Egwunatum, Samuel; Joseph-Akwara, Esther; Akaigwe, Richard

    2016-09-01

    Given the ability of a Building Information Model (BIM) to serve as a multi-disciplinary data repository, this paper seeks to explore and exploit the sustainability value of Building Information Modelling/models in delivering buildings that require less energy for their operation, emit less CO2 and at the same time provide a comfortable living environment for their occupants. This objective was achieved by a critical and extensive review of the literature covering: (1) building energy consumption, (2) building energy performance and analysis, and (3) building information modeling and energy assessment. The literature cited in this paper showed that linking an energy analysis tool with a BIM model helped project design teams to predict and create optimized energy consumption. To validate this finding, an in-depth analysis was carried out on a completed BIM integrated construction project using the Arboleda Project in the Dominican Republic. The findings showed that the BIM-based energy analysis helped the design team achieve the world's first 103% positive energy building. From the research findings, the paper concludes that linking an energy analysis tool with a BIM model helps to expedite the energy analysis process, provide more detailed and accurate results as well as deliver energy-efficient buildings. The study further recommends that the adoption of a level 2 BIM and the integration of BIM in energy optimization analyse should be made compulsory for all projects irrespective of the method of procurement (government-funded or otherwise) or its size.

  14. Opportunities for nurses in a private finance initiative.

    PubMed

    Gittoes, Paula; Trim, Joanna C

    The private finance initiative is part of the government's building procurement policy, incorporating both public and private sectors. This article outlines the part nurses can play, as a clinical adviser, within a PFI project team and within particular aspects of the PFI process.

  15. Achieving Maximum Integration Utilizing Requirements Flow Down

    NASA Technical Reports Server (NTRS)

    Archiable, Wes; Askins, Bruce

    2011-01-01

    A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.

  16. Analysis of Software Development Methodologies to Build Safety Software Applications for the SATEX-II: A Mexican Experimental Satellite

    NASA Astrophysics Data System (ADS)

    Aguilar Cisneros, Jorge; Vargas Martinez, Hector; Pedroza Melendez, Alejandro; Alonso Arevalo, Miguel

    2013-09-01

    Mexico is a country where the experience to build software for satellite applications is beginning. This is a delicate situation because in the near future we will need to develop software for the SATEX-II (Mexican Experimental Satellite). SATEX- II is a SOMECyTA's project (the Mexican Society of Aerospace Science and Technology). We have experienced applying software development methodologies, like TSP (Team Software Process) and SCRUM in other areas. Then, we analyzed these methodologies and we concluded: these can be applied to develop software for the SATEX-II, also, we supported these methodologies with SSP-05-0 Standard in particular with ESA PSS-05-11. Our analysis was focusing on main characteristics of each methodology and how these methodologies could be used with the ESA PSS 05-0 Standards. Our outcomes, in general, may be used by teams who need to build small satellites, but, in particular, these are going to be used when we will build the on board software applications for the SATEX-II.

  17. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    NASA Astrophysics Data System (ADS)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  18. SpaceX Recovery Training

    NASA Image and Video Library

    2018-02-28

    On February 28, SpaceX completed a demonstration of their ability to recover the crew and capsule after a nominal water splashdown. This marks an important recovery milestone and joint test. The timeline requirement from splashdown to crew egress onboard the ship is one hour, and the recovery team demonstrated that they can accomplish this operation under worst-case conditions in under 45 minutes. Further improvements are planned to shorten the recovery time even more as the team works to build a process that is safe, repeatable, and efficient.

  19. Team-Building Tools for Students.

    ERIC Educational Resources Information Center

    Page, Diana; Donelan, Joseph G.

    2003-01-01

    Explains why college students need teamwork skills. Discusses how instructors can help develop those skills and design projects to improve them. Provides an action plan and team-building tools. (Author/SK)

  20. Building Efficiency Technologies by Tomorrow’s Engineers and Researchers (BETTER) Capstone. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yee, Shannon

    BETTER Capstone supported 29 student project teams consisting of 155 students over two years in developing transformative building energy efficiency technologies through a capstone design experience. Capstone is the culmination of an undergraduate student’s engineering education. Interdisciplinary teams of students spent a semester designing and prototyping a technological solution for a variety building energy efficiency problems. During this experience students utilized the full design process, including the manufacturing and testing of a prototype solution, as well as publically demonstrating the solution at the Capstone Design Expo. As part of this project, students explored modern manufacturing techniques and gained hands-on experiencemore » with these techniques to produce their prototype technologies. This research added to the understanding of the challenges within building technology education and engagement with industry. One goal of the project was to help break the chicken-and-egg problem with getting students to engage more deeply with the building technology industry. It was learned however that this industry is less interested in trying innovative new concept but rather interested in hiring graduates for existing conventional building efforts. While none of the projects yielded commercial success, much individual student growth and learning was accomplished, which is a long-term benefit to the public at large.« less

  1. Instructional Strategies Designed to Develop Trust and Team Building Skills in School Leaders

    ERIC Educational Resources Information Center

    Freeman, Virgil

    2006-01-01

    This paper will provide readers with insight into "Team Building and Decision-Making" curriculum methods and strategies utilized in leadership for our administrators. The content is based on "The Five Dysfunctions of a Team: A Leadership Fable" by Lencioni (2002). The writer is working on developing a unique cascade of…

  2. Team Building OD Interventions and Outcomes in a Public School.

    ERIC Educational Resources Information Center

    Patterson, Wade N.; DeVille, Anthony P.

    This paper describes a study of an organization development intervention with an eight-person teaching-support-administrative team in a suburban elementary school. Data for the study were gathered through observation by two participant-observers, through interviews with all eight direct participants in the team-building project, and through a…

  3. 78 FR 8174 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... Smaligo, Chairman, Building, 633 West team.com/lomrs.hrm. County (12-06- Tulsa County Board 3rd Street... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes....rampp- March 28, 2013 400360 Collinsville (12- Weaver, Mayor, Street, team.com/lomrs.hrm. 06-4005P...

  4. 78 FR 14573 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... Municipal team.com/lomrs.htm. Mayor, City of Building, 503 Waynesboro, 503 West Main Street, West Main... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes... http://www.rampp- April 22, 2013......... 050192 06-0842P). Mattingly, Mayor, Street, Benton, team.com...

  5. 78 FR 8170 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... Development team.com/ of Sachse, 3815 Department, 3815 lomrs.htm. Sachse Road, Sachse Road, Building B... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes... http://www.rampp- March 7, 2013 350146 (12-06-2669P). Thomas E. Civic Center team.com/ Swisstack, Mayor...

  6. 78 FR 35305 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ....rampp- August 12, 2013 350002 Albuquerque, (12- Richard J. Berry, Building team.com/ 06-3488P). Mayor... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes... 420 West Main http://www.rampp- August 12, 2013 405378 City,. Cornett, Mayor, Street, Suite team.com...

  7. Building a world-class A/P function: how UPMC went paperless.

    PubMed

    DeLuca, Michael; Smith, Corey

    2010-03-01

    UPMC engaged people, processes, and technology to move its A/P function from a highly manual, paper-based operation to a completely automated process. UPMC's CFO hired a chief supply chain officer to develop a strategic plan, and UPMC named a value analysis team to gain clinician buy-in. UPMC automated A/P by enabling receipt of electronic invoices. UPMC streamlined its processes for invoices.

  8. On the Road to Empowerment: A Comprehensive Analysis of Teacher Involvement in Decision Making Processes.

    ERIC Educational Resources Information Center

    Murray, David R.; And Others

    Within the arena of public school reform, teacher empowerment and participation in the decision making process at the building level are of paramount importance. A collaborative team of teacher educators and public school staff was assembled to assess various perceptions of site-based decision making throughout Georgia. A random sample of 400…

  9. The Fidelity of Implementation of the Response to Intervention (RTI) Process in Missouri Public Schools

    ERIC Educational Resources Information Center

    Drury, Debra A.

    2014-01-01

    The purpose of this problem-based study was to gather data which analyzed the degree of fidelity of implementation of Response to Intervention as reported by building principals in the State of Missouri. The project began when team members, providing professional development for the Response to Intervention process, came to the conclusion there…

  10. Conducting HIV Research in Racial and Ethnic Minority Communities: Building a Successful Interdisciplinary Research Team

    PubMed Central

    Polanco, Frinny R.; Dominguez, Dinora C.; Grady, Christine; Stoll, Pamela; Ramos, Catalina; Mican, JoAnn M.; Miranda-Acevedo, Robert; Morgan, Marcela; Aizvera, Jeasmine; Purdie, Lori; Koziol, Deloris; Rivera-Goba, Migdalia V.

    2011-01-01

    HIV infection occurs in disproportionately high rates among racial and ethnic minorities in the United States, making it imperative that individuals from these groups be included in research studies. Unfortunately, it is often difficult to recruit HIV-infected Hispanics and African Americans into clinical trials, but a skilled interdisciplinary team that includes researchers with racial and ethnic diversity can help. This article describes a successful approach for building an interdisciplinary team that values the participation of racial and ethnic minorities in clinical trials and that has the skills to work with these groups. The success of the Adelante (a Spanish word meaning forward) Team can be attributed to team members who actively participate in decision-making, are empowered, and function in a cohesive manner. Successful research teams build relationships with research participants in order to increase the probability that racial and ethnic minorities will enroll and participate fully in research. PMID:21277228

  11. Conducting HIV research in racial and ethnic minority communities: building a successful interdisciplinary research team.

    PubMed

    Polanco, Frinny R; Dominguez, Dinora C; Grady, Christine; Stoll, Pamela; Ramos, Catalina; Mican, Joann M; Miranda-Acevedo, Robert; Morgan, Marcela; Aizvera, Jeasmine; Purdie, Lori; Koziol, Deloris; Rivera-Goba, Migdalia V

    2011-01-01

    HIV infection occurs in disproportionately high rates among racial and ethnic minorities in the United States, making it imperative that individuals from these groups be included in research studies. However, it is often difficult to recruit HIV-infected Hispanics and African Americans in clinical trials, but a skilled interdisciplinary team that includes researchers with racial and ethnic diversity can help. This article describes a successful approach for building an interdisciplinary team that values the participation of racial and ethnic minorities in clinical trials and has the skills to work with these groups. The success of the Adelante (a Spanish word meaning forward) Team can be attributed to team members who actively participate in decision-making, are empowered, and function in a cohesive manner. Successful research teams build relationships with research participants to increase the probability that racial and ethnic minorities will enroll and participate fully in research. Published by Elsevier Inc.

  12. 122. HISTORIC AMERICAN BUILDINGS SURVEY TEAM MEASURING EXTERIOR OF INDEPENDENCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    122. HISTORIC AMERICAN BUILDINGS SURVEY TEAM MEASURING EXTERIOR OF INDEPENDENCE HALL (LEE NELSON ON CORNER LEANING OVER) - Independence Hall Complex, Independence Hall, 500 Chestnut Street, Philadelphia, Philadelphia County, PA

  13. Related Services Research for Students With Low-Incidence Disabilities: Implications for Speech-Language Pathologists in Inclusive Classrooms.

    PubMed

    Giangreco, Michael F

    2000-07-01

    When speech-language pathologists provide educationally related services for students with lowincidence disabilities who are placed in inclusive classrooms, they are asked to work with a variety of other adults. The ways in which these adults make decisions about individualizing a student's educational program, determine related services, and coordinate their activities have an impact on educational outcomes for students as well as on interprofessional interactions. This article summarizes a team process for making related services decisions called VISTA (Vermont Interdependent Services Team Approach) and a series of nine research studies pertaining to the use and impact of VISTA. It also addresses related topics, such as team size, consumer perspectives, and paraprofessional supports. Five major implications from these studies are offered concerning (a) developing a disposition of being an ongoing learner, (b) developing a shared framework among team members, (c) having a research-based process to build consensus, (d) clarifying roles, and (e) increasing involvement of families and general education teachers.

  14. 48 CFR 1852.236-75 - Partnering for construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... “partnership” used herein shall mean a relationship of open communication and close cooperation that involves... development and team building workshop. Follow-up team building workshops will be held periodically throughout...

  15. Team Building for Quality: Transitions in the American Community College.

    ERIC Educational Resources Information Center

    Baker, George A., III; And Others

    Organized around the themes of quality and team building, this book contains essays by community college practitioners who address various structural or thematic aspects of the community college. The book contains these articles: (1) "A Team Approach to Institutional Quality: Toward a Model," by George A. Baker, III, and Vaughn Mamlin Upshaw; (2)…

  16. 77 FR 71807 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... 170931 areas of McLean Matt Sorenson, Building and Zoning team.com/starr/LOMR/ County (11-05- Chairman... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes.... Boulevard, Boise, ID team.com/starr/LOMR/ Biester, Mayor, 83702. Pages/RegionX.aspx. City of Boise, 150...

  17. HABS drawing field team at east entrance to Cyclorama Building. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HABS drawing field team at east entrance to Cyclorama Building. Front, left to right: Robyn Chrabascz (Roger Williams University), Brian Carnahan (University of Arkansas), Noelle McManus (Edinburgh College of Art, ICOMOS/Great Britian), Amanda Loughlin (Kansas State University). Standing: Steven Utz, Field Supervisor. - Cyclorama Building, 125 Taneytown Road, Gettysburg, Adams County, PA

  18. The effects of team reflexivity on psychological well-being in manufacturing teams.

    PubMed

    Chen, Jingqiu; Bamberger, Peter A; Song, Yifan; Vashdi, Dana R

    2018-04-01

    While the impact of team reflexivity (a.k.a. after-event-reviews, team debriefs) on team performance has been widely examined, we know little about its implications on other team outcomes such as member well-being. Drawing from prior team reflexivity research, we propose that reflexivity-related team processes reduce demands, and enhance control and support. Given the centrality of these factors to work-based strain, we posit that team reflexivity, by affecting these factors, may have beneficial implications on 3 core dimensions of employee burnout, namely exhaustion, cynicism, and inefficacy (reduced personal accomplishment). Using a sample of 469 unskilled manufacturing workers employed in 73 production teams in a Southern Chinese factory, we implemented a time lagged, quasi-field experiment, with half of the teams trained in and executing an end-of-shift team debriefing, and the other half assigned to a control condition and undergoing periodic postshift team-building exercises. Our findings largely supported our hypotheses, demonstrating that relative to team members assigned to the control condition, those assigned to the reflexivity condition experienced a significant improvement in all 3 burnout dimensions over time. These effects were mediated by control and support (but not demands) and amplified as a function of team longevity. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  19. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  20. Evaluating a team-based approach to research capacity building using a matched-pairs study design.

    PubMed

    Holden, Libby; Pager, Susan; Golenko, Xanthe; Ware, Robert S; Weare, Robyn

    2012-03-12

    There is a continuing need for research capacity building initiatives for primary health care professionals. Historically strategies have focused on interventions aimed at individuals but more recently theoretical frameworks have proposed team-based approaches. Few studies have evaluated these new approaches. This study aims to evaluate a team-based approach to research capacity building (RCB) in primary health using a validated quantitative measure of research capacity in individual, team and organisation domains. A non-randomised matched-pairs trial design was used to evaluate the impact of a multi-strategy research capacity building intervention. Four intervention teams recruited from one health service district were compared with four control teams from outside the district, matched on service role and approximate size. All were multi-disciplinary allied health teams with a primary health care role. Random-effects mixed models, adjusting for the potential clustering effect of teams, were used to determine the significance of changes in mean scores from pre- to post-intervention. Comparisons of intervention versus control groups were made for each of the three domains: individual, team and organisation. The Individual Domain measures the research skills of the individual, whereas Team and Organisation Domains measure the team/organisation's capacity to support and foster research, including research culture. In all three domains (individual, team and organisation) there were no occasions where improvements were significantly greater for the control group (comprising the four control teams, n = 32) compared to the intervention group (comprising the four intervention teams, n = 37) either in total domain score or domain item scores. However, the intervention group had a significantly greater improvement in adjusted scores for the Individual Domain total score and for six of the fifteen Individual Domain items, and to a lesser extent with Team and Organisation Domains (two items in the Team and one in the Organisation domains). A team-based approach to RCB resulted in considerable improvements in research skills held by individuals for the intervention group compared to controls; and some improvements in the team and organisation's capacity to support research. More strategies targeted at team and organisation research-related policies and procedures may have resulted in increased improvements in these domains.

  1. Building Science Identity in Disadvantaged Teenage Girls using an Apprenticeship Model

    NASA Astrophysics Data System (ADS)

    Pettit, E. C.; Conner, L.; Tzou, C.

    2015-12-01

    Expeditionary science differs from laboratory science in that expeditionary science teams conduct investigations in conditions that are often physically and socially, as well as intellectually, challenging. Team members live in close quarters for extended periods of time, team building and leadership affect the scientific process, and research tools are limited to what is available on site. Girls on Ice is an expeditionary science experience primarily for disadvantaged girls; it fully immerses girls in a mini scientific expedition to study alpine, glacierized environments. In addition to mentoring the girls through conducting their own scientific research, we encourage awareness and discussion of different sociocultural perspectives on the relation between the natural world, science, and society. The experience aligns closely with the apprenticeship model of learning, which can be effective in enhancing identification with science. Using a mixed-methods approach, we show that the Girls on Ice model helps girls (1) increase their interest and engagement in science and build a stronger science identity, (2) develop confidence, importantly they develop a combined physical and intellectual confidence; (3) engage in authentic scientific thinking, including critical thinking and problem solving; and (4) enhance leadership self-confidence. We discuss these results in a learning sciences framework, which posits that learning is inseparable from the social and physical contexts in which it takes place.

  2. Hearing the voices of service user researchers in collaborative qualitative data analysis: the case for multiple coding.

    PubMed

    Sweeney, Angela; Greenwood, Kathryn E; Williams, Sally; Wykes, Til; Rose, Diana S

    2013-12-01

    Health research is frequently conducted in multi-disciplinary teams, with these teams increasingly including service user researchers. Whilst it is common for service user researchers to be involved in data collection--most typically interviewing other service users--it is less common for service user researchers to be involved in data analysis and interpretation. This means that a unique and significant perspective on the data is absent. This study aims to use an empirical report of a study on Cognitive Behavioural Therapy for psychosis (CBTp) to demonstrate the value of multiple coding in enabling service users voices to be heard in team-based qualitative data analysis. The CBTp study employed multiple coding to analyse service users' discussions of CBT for psychosis (CBTp) from the perspectives of a service user researcher, clinical researcher and psychology assistant. Multiple coding was selected to enable multiple perspectives to analyse and interpret data, to understand and explore differences and to build multi-disciplinary consensus. Multiple coding enabled the team to understand where our views were commensurate and incommensurate and to discuss and debate differences. Through the process of multiple coding, we were able to build strong consensus about the data from multiple perspectives, including that of the service user researcher. Multiple coding is an important method for understanding and exploring multiple perspectives on data and building team consensus. This can be contrasted with inter-rater reliability which is only appropriate in limited circumstances. We conclude that multiple coding is an appropriate and important means of hearing service users' voices in qualitative data analysis. © 2012 John Wiley & Sons Ltd.

  3. A Novel Program Trains Community‐Academic Teams to Build Research and Partnership Capacity

    PubMed Central

    Brown, Jen; LeBailly, Susan; McGee, Richard; Bayldon, Barbara; Huber, Gail; Kaleba, Erin; Lowry, Kelly Walker; Martens, Joseph; Mason, Maryann; Nuñez, Abel

    2013-01-01

    Abstract The Community‐Engaged Research Team Support (CERTS) program was developed and tested to build research and partnership capacity for community‐engaged research (CEnR) teams. Led by the Northwestern University Clinical and Translational Sciences Institute (NUCATS), the goals of CERTS were: (1) to help community‐academic teams build capacity for conducting rigorous CEnR and (2) to support teams as they prepare federal grant proposal drafts. The program was guided by an advisory committee of community and clinical partners, and representatives from Chicago's Clinical and Translational Science Institutes. Monthly workshops guided teams to write elements of NIH‐style research proposals. Draft reviewing fostered a collaborative learning environment and helped teams develop equal partnerships. The program culminated in a mock‐proposal review. All teams clarified their research and acquired new knowledge about the preparation of NIH‐style proposals. Trust, partnership collaboration, and a structured writing strategy were assets of the CERTS approach. CERTS also uncovered gaps in resources and preparedness for teams to be competitive for federally funded grants. Areas of need include experience as principal investigators, publications on study results, mentoring, institutional infrastructure, and dedicated time for research. PMID:23751028

  4. Building America Case Study: Excavationless Exterior-Side Foundation Insulation for Existing Homes, Minneapolis, Minnesota (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NorthernSTAR

    Building science research supports installing exterior (soil side) foundation insulation as the optimal method to enhance the hygrothermal performance of new homes. With exterior foundation insulation, water management strategies are maximized while insulating the basement space and ensuring a more even temperature at the foundation wall. However, such an approach can be very costly and disruptive when applied to an existing home, requiring deep excavation around the entire house. The NorthernSTAR Building America Partnership team implemented an innovative, minimally invasive foundation insulation upgrade technique on an existing home. The approach consisted of using hydrovac excavation technology combined with a liquidmore » insulating foam. The team was able to excavate a continuous 4" wide by 4' to 5' deep trench around the entire house, 128 linear feet, except for one small part under the stoop that was obstructed with concrete debris. The combination pressure washer and vacuum extraction technology also enabled the elimination of large trenches and soil stockpiles normally produced by backhoe excavation. The resulting trench was filled with liquid insulating foam, which also served as a water-control layer of the assembly. The insulation was brought above grade using a liquid foam/rigid foam hybrid system and terminated at the top of the rim joist. Cost savings over the traditional excavation process ranged from 23% to 50%. The excavationless process could result in even greater savings since replacement of building structures, exterior features, utility meters, and landscaping would be minimal or non-existent in an excavationless process.« less

  5. Building organizational supports for knowledge sharing in county human service organizations: a cross-case analysis of works-in-progress.

    PubMed

    Lee, Chris; Austin, Michael J

    2012-01-01

    Building on the literature related to evidence-based practice, knowledge management, and learning organizations, this cross-case analysis presents twelve works-in-progress in ten local public human service organizations seeking to develop their own knowledge sharing systems. The data for this cross-case analysis can be found in the various contributions to this Special Issue. The findings feature the developmental aspects of building a learning organization that include knowledge sharing systems featuring transparency, self-assessment, and dissemination and utilization. Implications for practice focus on the structure and processes involved in building knowledge sharing teams inside public human service organizations. Copyright © Taylor & Francis Group, LLC

  6. Issues in Developing a Normative Descriptive Model for Dyadic Decision Making

    NASA Technical Reports Server (NTRS)

    Serfaty, D.; Kleinman, D. L.

    1984-01-01

    Most research in modelling human information processing and decision making has been devoted to the case of the single human operator. In the present effort, concepts from the fields of organizational behavior, engineering psychology, team theory and mathematical modelling are merged in an attempt to consider first the case of two cooperating decisionmakers (the Dyad) in a multi-task environment. Rooted in the well-known Dynamic Decision Model (DDM), the normative descriptive approach brings basic cognitive and psychophysical characteristics inherent to human behavior into a team theoretic analytic framework. An experimental paradigm, involving teams in dynamic decision making tasks, is designed to produce the data with which to build the theoretical model.

  7. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less

  8. Measure Guideline: High Efficiency Natural Gas Furnaces

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brand, L.; Rose, W.

    2012-10-01

    This Measure Guideline covers installation of high-efficiency gas furnaces. Topics covered include when to install a high-efficiency gas furnace as a retrofit measure, how to identify and address risks, and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

  9. Measure Guideline. High Efficiency Natural Gas Furnaces

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brand, L.; Rose, W.

    2012-10-01

    This measure guideline covers installation of high-efficiency gas furnaces, including: when to install a high-efficiency gas furnace as a retrofit measure; how to identify and address risks; and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.

  10. Coalescing a School Community around Total Quality: A Superintendent's Perspective.

    ERIC Educational Resources Information Center

    Manley, Robert J.

    1996-01-01

    Inspired by Deming's work, the superintendent of West Babylon (New York) Schools convened his administrative team to build a consensus about the schools' mission. The vision statement outlines four primary functions: protective care, civic training, personality development, and teaching of knowledge. The district's goal-driven process surmounted…

  11. Collaborative Textbook Selection: A Case Study Leading to Practical and Theoretical Considerations

    ERIC Educational Resources Information Center

    Czerwionka, Lori; Gorokhovsky, Bridget

    2015-01-01

    This case study developed a collaborative approach to the selection of a Spanish language textbook. The collaborative process consisted of six steps, detailed in this article: team building, generating evaluation criteria, formulating a meaningful rubric, selecting prospective textbooks, calculating rubric results, and reflectively reviewing…

  12. NOVA, A BRIEF .....

    ERIC Educational Resources Information Center

    WHITING, RICHARD; AND OTHERS

    NOVA IS AN EXPERIMENTAL, 6-YEAR JUNIOR-SENIOR HIGH SCHOOL. ASPECTS OF THE PROGRAM INCLUDE THE TRIMESTER SYSTEM, THE CONTINUOUS PROGRESS CURRICULUM, TEAM TEACHING, A CLASS SCHEDULE OF FOUR 70-MINUTE PERIODS PER WEEK, THE USE OF DATA-PROCESSING EQUIPMENT, AND MODERN INSTRUCTIONAL AIDS. NOVA IS ORGANIZED CAMPUS-STYLE WITH INDIVIDUAL BUILDINGS DEVOTED…

  13. Do You Have a Crisis Management Plan?

    ERIC Educational Resources Information Center

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  14. Requirements Engineering in Building Climate Science Software

    NASA Astrophysics Data System (ADS)

    Batcheller, Archer L.

    Software has an important role in supporting scientific work. This dissertation studies teams that build scientific software, focusing on the way that they determine what the software should do. These requirements engineering processes are investigated through three case studies of climate science software projects. The Earth System Modeling Framework assists modeling applications, the Earth System Grid distributes data via a web portal, and the NCAR (National Center for Atmospheric Research) Command Language is used to convert, analyze and visualize data. Document analysis, observation, and interviews were used to investigate the requirements-related work. The first research question is about how and why stakeholders engage in a project, and what they do for the project. Two key findings arise. First, user counts are a vital measure of project success, which makes adoption important and makes counting tricky and political. Second, despite the importance of quantities of users, a few particular "power users" develop a relationship with the software developers and play a special role in providing feedback to the software team and integrating the system into user practice. The second research question focuses on how project objectives are articulated and how they are put into practice. The team seeks to both build a software system according to product requirements but also to conduct their work according to process requirements such as user support. Support provides essential communication between users and developers that assists with refining and identifying requirements for the software. It also helps users to learn and apply the software to their real needs. User support is a vital activity for scientific software teams aspiring to create infrastructure. The third research question is about how change in scientific practice and knowledge leads to changes in the software, and vice versa. The "thickness" of a layer of software infrastructure impacts whether the software team or users have control and responsibility for making changes in response to new scientific ideas. Thick infrastructure provides more functionality for users, but gives them less control of it. The stability of infrastructure trades off against the responsiveness that the infrastructure can have to user needs.

  15. The systematic review team: contributions of the health sciences librarian.

    PubMed

    Dudden, Rosalind F; Protzko, Shandra L

    2011-01-01

    While the role of the librarian as an expert searcher in the systematic review process is widely recognized, librarians also can be enlisted to help systematic review teams with other challenges. This article reviews the contributions of librarians to systematic reviews, including communicating methods of the review process, collaboratively formulating the research question and exclusion criteria, formulating the search strategy on a variety of databases, documenting the searches, record keeping, and writing the search methodology. It also discusses challenges encountered such as irregular timelines, providing education, communication, and learning new technologies for record keeping. Rewards include building relationships with researchers, expanding professional expertise, and receiving recognition for contributions to health care outcomes.

  16. Hamline/3M Project: Liaison for Curricular Change

    NASA Astrophysics Data System (ADS)

    Rundquist, Andy

    2002-03-01

    This project was designed to catalyze curricular changes to better prepare students for the workplace. Industrial managers provided a list of 16 characteristics valued in the workplace: most were NOT related to science course content. The project formed 5 teams each including 3M professionals and students. Each team developed curricular changes in one of the 16 areas. Team goals were to improve skills in communication, data analysis, business/economics, team problem solving, and culture competency. Curricular changes realized include communication skill activities embodied in science courses and faculty communication teaching skill seminars, self learning tools in data analysis, statistics and model building, a new course developed with assistance from 3M personnel focussing on topics directly related to technological industries, high performance team problem solving training/coaching for faculty and workshops for students and faculty relative to importance of cultural competencies in the workplace, and a new course focusing on culture, team problem solving and conflict resolution in the technical workplace. Process for developing and content of curricular changes will be reported.

  17. The Design of Akhmat Tower

    NASA Astrophysics Data System (ADS)

    Beardsley, Sara; Stochetti, Alejandro; Cerone, Marc

    2018-03-01

    Akhmat Tower is a 435m supertall building designed by Adrian Smith + Gordon Gill Architecture. It is currently under construction in the city of Grozny, in the Chechen Republic, in the North Caucasus region of Russia. The design of the tower was done during a collaborative process by a multi-disciplinary architectural and engineering team, based primarily in the United States and Russia. During this process, the designers considered many factors including, most primarily, the cultural and historical context, the structural requirements given the high seismicity of the region, and the client's programmatic needs. The resulting crystalline-shaped tower is both an aesthetic statement and a performative architectural solution which will be a new landmark for Chechnya. "The Design of Akhmat Tower" describes in detail the design process including structural considerations, exterior wall design, building program, interior design, the tuned mass damper, and the use of building information modeling.

  18. Building international collaborative capacity: contributions of community psychologists to a European network.

    PubMed

    García-Ramírez, Manuel; Paloma, Virginia; Suarez-Balcazar, Yolanda; Balcazar, Fabricio

    2009-09-01

    Europe is in the process of building a more participative, just, and inclusive European Union. The European Social Fund, which is an initiative developed to actively promote multinational partnerships that address pressing social issues, is a good example of the European transformation. This article describes the steps taken to develop and evaluate the activities of an international network promoting collaborative capacity among regional partners involved in the prevention of labor discrimination toward immigrants in three European countries-Spain, Belgium, and Italy. An international team of community psychologists proposed an empowering approach to assess the collaborative capacity of the network. This approach consisted of three steps: (1) establishing a collaborative relationship among partners, (2) building collaborative capacity, and (3) evaluating the collaborative capacity of the network. We conclude with lessons learned from the process and provide recommendations for addressing the challenges inherent in international collaboration processes.

  19. Interprofessional team building in the palliative home care setting: Use of a conceptual framework to inform a pilot evaluation.

    PubMed

    Shaw, James; Kearney, Colleen; Glenns, Brenda; McKay, Sandra

    2016-01-01

    Home-based palliative care is increasingly dependent on interprofessional teams to deliver collaborative care that more adequately meets the needs of clients and families. The purpose of this pilot evaluation was to qualitatively explore the views of an interprofessional group of home care providers (occupational therapists, nurses, personal support work supervisors, community care coordinators, and a team coordinator) regarding a pilot project encouraging teamwork in interprofessional palliative home care services. We used qualitative methods, informed by an interprofessional conceptual framework, to analyse participants' accounts and provide recommendations regarding strategies for interprofessional team building in palliative home health care. Findings suggest that encouraging practitioners to share past experiences and foster common goals for palliative care are important elements of team building in interprofessional palliative care. Also, establishing a team leader who emphasises sharing power among team members and addressing the need for mutual emotional support may help to maximise interprofessional teamwork in palliative home care. These findings may be used to develop and test more comprehensive efforts to promote stronger interprofessional teamwork in palliative home health care delivery.

  20. Balancing Science Objectives and Operational Constraints: A Mission Planner's Challenge

    NASA Technical Reports Server (NTRS)

    Weldy, Michelle

    1996-01-01

    The Air Force minute sensor technology integration (MSTI-3) satellite's primary mission is to characterize Earth's atmospheric background clutter. MSTI-3 will use three cameras for data collection, a mid-wave infrared imager, a short wave infrared imager, and a visible imaging spectrometer. Mission science objectives call for the collection of over 2 million images within the one year mission life. In addition, operational constraints limit camera usage to four operations of twenty minutes per day, with no more than 10,000 data and calibrating images collected per day. To balance the operational constraints and science objectives, the mission planning team has designed a planning process to e event schedules and sensor operation timelines. Each set of constraints, including spacecraft performance capabilities, the camera filters, the geographical regions, and the spacecraft-Sun-Earth geometries of interest, and remote tracking station deconflictions has been accounted for in this methodology. To aid in this process, the mission planning team is building a series of tools from commercial off-the-shelf software. These include the mission manifest which builds a daily schedule of events, and the MSTI Scene Simulator which helps build geometrically correct scans. These tools provide an efficient, responsive, and highly flexible architecture that maximizes data collection while minimizing mission planning time.

  1. Team building: a leadership strategy.

    PubMed

    San Juan, S P

    1998-01-01

    This paper will present the importance of teamwork, as well as those behavioral science principles relative to team-building in an organization. Characteristics of an effective work team and some important dimensions of supervisory leadership including inputs on how members of a task group can contribute to team-building will be described. Some guidelines for supervisors and employees in connection with teamwork will be discussed. Human beings of every age are finding their time consumed by the demands of organizations to which they "belong" and still are badgered to join other groups during a lifetime. In the International College of Dentists, Philippine Section, where we pride ourselves to be a part of, membership is defined. We are supposed to be endowed with group consciousness, a sense of purpose, an interaction among ourselves, and interdependence in the satisfaction of our needs in a unitary manner. In essence, we are linked by some common, identifiable characteristics bound by the element of teamwork for the achievement of a common desirable goal. A leadership style that emphasizes team-building, therefore ensures not only that a job gets done, but it is done efficiently, effectively and harmoniously.

  2. Occupational therapy students in the process of interprofessional collaborative learning: a grounded theory study.

    PubMed

    Howell, Dana

    2009-01-01

    The purpose of this grounded theory study was to generate a theory of the interprofessional collaborative learning process of occupational therapy (OT) students who were engaged in a collaborative learning experience with students from other allied health disciplines. Data consisted of semi-structured interviews with nine OT students from four different interprofessional collaborative learning experiences at three universities. The emergent theory explained OT students' need to build a culture of mutual respect among disciplines in order to facilitate interprofessional collaborative learning. Occupational therapy students went through a progression of learned skills that included learning how to represent the profession of OT, hold their weight within a team situation, solve problems collaboratively, work as a team, and ultimately, to work in an actual team in practice. This learning process occurred simultaneously as students also learned course content. The students had to contend with barriers and facilitators that influenced their participation and the success of their collaboration. Understanding the interprofessional learning process of OT students will help allied health faculty to design more effective, inclusive interprofessional courses.

  3. Perspectives of Community Co-Researchers About Group Dynamics and Equitable Partnership Within a Community-Academic Research Team.

    PubMed

    Vaughn, Lisa M; Jacquez, Farrah; Zhen-Duan, Jenny

    2018-04-01

    Equitable partnership processes and group dynamics, including individual, relational, and structural factors, have been identified as key ingredients to successful community-based participatory research partnerships. The purpose of this qualitative study was to investigate the key aspects of group dynamics and partnership from the perspectives of community members serving as co-researchers. Semistructured, in-depth interviews were conducted with 15 Latino immigrant co-researchers from an intervention project with Latinos Unidos por la Salud (LU-Salud), a community research team composed of Latino immigrant community members and academic investigators working in a health research partnership. A deductive framework approach guided the interview process and qualitative data analysis. The LU-Salud co-researchers described relationships, personal growth, beliefs/identity motivation (individual dynamics), coexistence (relational dynamics), diversity, and power/resource sharing (structural dynamics) as key foundational aspects of the community-academic partnership. Building on existing CBPR and team science frameworks, these findings demonstrate that group dynamics and partnership processes are fundamental drivers of individual-level motivation and meaning making, which ultimately sustain efforts of community partners to engage with the research team and also contribute to the achievement of intended research outcomes.

  4. Using ‘appreciative inquiry’ in India to improve infection control practices in maternity care: a qualitative study

    PubMed Central

    Sharma, Bharati; Ramani, K.V.; Mavalankar, Dileep; Kanguru, Lovney; Hussein, Julia

    2015-01-01

    Background Infections acquired during childbirth are a common cause of maternal and perinatal mortality and morbidity. Changing provider behaviour and organisational settings within the health system is key to reducing the spread of infection. Objective To explore the opinions of health personnel on health system factors related to infection control and their perceptions of change in a sample of hospital maternity units. Design An organisational change process called ‘appreciative inquiry’ (AI) was introduced in three maternity units of hospitals in Gujarat, India. AI is a change process that builds on recognition of positive actions, behaviours, and attitudes. In-depth interviews were conducted with health personnel to elicit information on the environment within which they work, including physical and organisational factors, motivation, awareness, practices, perceptions of their role, and other health system factors related to infection control activities. Data were obtained from three hospitals which implemented AI and another three not involved in the intervention. Results Challenges which emerged included management processes (e.g. decision-making and problem-solving modalities), human resource shortages, and physical infrastructure (e.g. space, water, and electricity supplies). AI was perceived as having a positive influence on infection control practices. Respondents also said that management processes improved although some hospitals had already undergone an accreditation process which could have influenced the changes described. Participants reported that team relationships had been strengthened due to AI. Conclusion Technical knowledge is often emphasised in health care settings and less attention is paid to factors such as team relationships, leadership, and problem solving. AI can contribute to improving infection control by catalysing and creating forums for team building, shared decision making and problem solving in an enabling environment. PMID:26119249

  5. Using 'appreciative inquiry' in India to improve infection control practices in maternity care: a qualitative study.

    PubMed

    Sharma, Bharati; Ramani, K V; Mavalankar, Dileep; Kanguru, Lovney; Hussein, Julia

    2015-01-01

    Infections acquired during childbirth are a common cause of maternal and perinatal mortality and morbidity. Changing provider behaviour and organisational settings within the health system is key to reducing the spread of infection. To explore the opinions of health personnel on health system factors related to infection control and their perceptions of change in a sample of hospital maternity units. An organisational change process called 'appreciative inquiry' (AI) was introduced in three maternity units of hospitals in Gujarat, India. AI is a change process that builds on recognition of positive actions, behaviours, and attitudes. In-depth interviews were conducted with health personnel to elicit information on the environment within which they work, including physical and organisational factors, motivation, awareness, practices, perceptions of their role, and other health system factors related to infection control activities. Data were obtained from three hospitals which implemented AI and another three not involved in the intervention. Challenges which emerged included management processes (e.g. decision-making and problem-solving modalities), human resource shortages, and physical infrastructure (e.g. space, water, and electricity supplies). AI was perceived as having a positive influence on infection control practices. Respondents also said that management processes improved although some hospitals had already undergone an accreditation process which could have influenced the changes described. Participants reported that team relationships had been strengthened due to AI. Technical knowledge is often emphasised in health care settings and less attention is paid to factors such as team relationships, leadership, and problem solving. AI can contribute to improving infection control by catalysing and creating forums for team building, shared decision making and problem solving in an enabling environment.

  6. Gaining the Competitive Edge: Design for Manufacturing

    NASA Technical Reports Server (NTRS)

    Batill, Stephen M.; Pinkelman, Jim; Sellar, Richard

    1993-01-01

    The successful design of a commercial aircraft which is intended to be in direct competition with existing aircraft requires a market analysis to establish design requirements, the development of a concept to achieve those goals. and the ability to economically manufacture the aircraft. It is often the case that an engineer designs system components with only the perspective of a particular discipline. The relationship of that component to the entire system is often a minor consideration. In an effort to highlight the interaction that is necessary during the design process, the students were organized into design/build teams and required to integrate aspects of market analysis, engineering design, production and economics into their concepts. In order to facilitate this process a hypothetical "Aeroworld" was established. Having been furnished relevant demographic and economic data for "Aeroworld". students were given the task of designing and building an aircraft for a specific market while achieving an economically competitive design. Involvement of the team in the evolution of the design from market definition to technical development to manufacturing allowed the students to identify critical issues in the design process and to encounter many of the conflicting requirements which arise in an aerospace systems design.

  7. A crew resource management program tailored to trauma resuscitation improves team behavior and communication.

    PubMed

    Hughes, K Michael; Benenson, Ronald S; Krichten, Amy E; Clancy, Keith D; Ryan, James Patrick; Hammond, Christopher

    2014-09-01

    Crew Resource Management (CRM) is a team-building communication process first implemented in the aviation industry to improve safety. It has been used in health care, particularly in surgical and intensive care settings, to improve team dynamics and reduce errors. We adapted a CRM process for implementation in the trauma resuscitation area. An interdisciplinary steering committee developed our CRM process to include a didactic classroom program based on a preimplementation survey of our trauma team members. Implementation with new cultural and process expectations followed. The Human Factors Attitude Survey and Communication and Teamwork Skills assessment tool were used to design, evaluate, and validate our CRM program. The initial trauma communication survey was completed by 160 team members (49% response). Twenty-five trauma resuscitations were observed and scored using Communication and Teamwork Skills. Areas of concern were identified and 324 staff completed our 3-hour CRM course during a 3-month period. After CRM training, 132 communication surveys and 38 Communication and Teamwork Skills observations were completed. In the post-CRM survey, respondents indicated improvement in accuracy of field to medical command information (p = 0.029); accuracy of emergency department medical command information to the resuscitation area (p = 0.002); and team leader identity, communication of plan, and role assignment (p = 0.001). After CRM training, staff were more likely to speak up when patient safety was a concern (p = 0.002). Crew Resource Management in the trauma resuscitation area enhances team dynamics, communication, and, ostensibly, patient safety. Philosophy and culture of CRM should be compulsory components of trauma programs and in resuscitation of injured patients. Copyright © 2014 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  8. Building Trusting Relationships in the Medical Practice Team: Thirty Rules to Live By for You and Your Staff.

    PubMed

    Hills, Laura

    2015-01-01

    A medical practice team without trust isn't really a team; it's just a group of individuals who work together in a medical practice, often making disappointing progress. This is true no matter how capable or talented the individuals are. Your staff may never reach its full potential if trust is not present. This article offers medical practice managers 30 rules for building trust in their practices: 15 rules that will help them in their leadership roles, and 15 rules to teach and discuss with their employees. It suggests a trust-building screening question to include in job interviews to determine if applicants have a high capacity for trust. It also describes Reina and Reina's "Three C's of Trust," a model that practice managers may find useful as they develop trust competencies in their staffs. This article also includes 10 inspiring quotes that will help medical practice employees build trust and five easy-to-facilitate trust-building exercises that managers can use with the medical practice team.

  9. Planning a pharmacy-led medical mission trip, part 2: servant leadership and team dynamics.

    PubMed

    Brown, Dana A; Brown, Daniel L; Yocum, Christine K

    2012-06-01

    While pharmacy curricula can prepare students for the cognitive domains of pharmacy practice, mastery of the affective aspects can prove to be more challenging. At the Gregory School of Pharmacy, medical mission trips have been highly effective means of impacting student attitudes and beliefs. Specifically, these trips have led to transformational changes in student leadership capacity, turning an act of service into an act of influence. Additionally, building team unity is invaluable to the overall effectiveness of the trip. Pre-trip preparation for teams includes activities such as routine team meetings, team-building activities, and implementation of committees, as a means of promoting positive team dynamics. While in the field, team dynamics can be fostered through activities such as daily debriefing sessions, team disclosure times, and provision of medical services.

  10. Empowering marginalized communities in water resources management: addressing inequitable practices in Participatory Model Building.

    PubMed

    Butler, Cameron; Adamowski, Jan

    2015-04-15

    Within the field of water resource management, Group Model Building (GMB) is a growing method used to engage stakeholders in the development of models that describe environmental and socioeconomic systems to create and test policy alternatives. While there is significant focus on improving stakeholder engagement, there is a lack of studies specifically looking at the experiences of marginalized communities and the barriers that prevent their fuller participation in the decision-making process. This paper explores the common issues and presents recommended improved practices, based on anti-oppression, related to the stages of problem framing, stakeholder identification and selection, workshop preparation, and workshop facilitation. For problem defining and stakeholder selection, the major recommendations are to engage diverse stakeholder communities from the earliest stages and give them control over framing the project scope. With regards to planning the model building workshops, it is recommended that the facilitation team work closely with marginalized stakeholders to highlight and address barriers that would prevent their inclusion. With the actual facilitation of the workshops, it is best to employ activities that allow stakeholders to provide knowledge and input in mediums that are most comfortable to them; additionally, the facilitation team needs to be able to challenge problematic interpersonal interactions as they manifest within conversations. This article focuses on building comfortability with political language so that the systemic oppression in which existing participatory processes occur can be understood, thus allowing GMB practitioners to engage in social justice efforts. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Students to Race Solar-Powered Model Cars

    Science.gov Websites

    hotel and the NREL Visitors Center. The SERF is the silver-colored building one-eighth mile past the teams Eagle Valley Middle School Two teams Fountain Middle School One team Hayden Middle School Two teams Kunsmiller Middle School One team Little Elementary Two teams Lyons Middle School Two teams Maple

  12. Introduction of Team Self-Regulation for Teamwork Promotion. A Case Study in Energy Engineering Topics

    ERIC Educational Resources Information Center

    González-Fernández, María Jesús; Sáiz-Manzanares, María Consuelo; Alaoui, Fatima E. M.; Aguilar, Fernando; Meneses, Jesús; Montero, Eduardo

    2013-01-01

    The learning and development of teamwork skill is only possible if its achievement is a self-building process of the student. In turn, the teachers must become guides in the process of a learning which is not limited only to the topic of their own course, but which must be imbedded with a good dose of this skill. Promotion of teamwork is not…

  13. KSC-04pd1731

    NASA Image and Video Library

    2004-09-08

    KENNEDY SPACE CENTER, FLA. - KSC employees secure the roof of the Processing Control Center which sustained damage from Hurricane Frances. The storm's path over Florida took it through Cape Canaveral and KSC property during Labor Day weekend. Located in Launch Complex 39 adjacent to the Vehicle Assembly Building (background right), the facility houses some of the staff and computers responsible for Launch Processing System (LPS) software development, launch team training, and LPS maintenance.

  14. Building a Winning Recruiting Team.

    ERIC Educational Resources Information Center

    Taguchi, Sherrie Gong

    2002-01-01

    Building a winning recruiting team is essential to the well being of virtually every organization. Putting together a great mix of people to represent an organization and bring in new talent can serve an organization well when competition is fierce or demand is down. (GCP)

  15. High Fidelity: Investing in Evaluation Training. Ask the Team

    ERIC Educational Resources Information Center

    Fetters, Jenni

    2013-01-01

    High-quality training is a crucial investment in establishing and maintaining implementation fidelity as well as building educators' trust in the new process. Training approaches for educator evaluation vary both in format (i.e., how it's delivered) and content (i.e., what is provided). Train-the-trainer sessions, online professional learning…

  16. Designing, Implementing and Maintaining a First Year Project Course in Electrical Engineering

    ERIC Educational Resources Information Center

    Lillieskold, J.; Ostlund, S.

    2008-01-01

    Being a modern electrical engineer does not only require state of the art skills in areas such as transfer and processing of information, electronics, systems engineering, and biomedical electrical engineering; it also requires generic engineering skills such as oral and written communication, team building, interpersonal skills, and the ability…

  17. Teaching Diversity: A Study of Organizational Needs and Diversity Curriculum in Higher Education.

    ERIC Educational Resources Information Center

    Day, Nancy E.; Glick, Betty J.

    2000-01-01

    Content analysis of 25 business college syllabi indicated that content skills related to diversity were being taught. Survey responses from 81 human resource managers suggested that college graduates were not adequately prepared to deal with diversity. Managers believed that process skills (team building, communication, managing and supervising…

  18. Creative Behavior, Motivation, Environment and Culture: The Building of a Systems Model

    ERIC Educational Resources Information Center

    Hennessey, Beth A.

    2015-01-01

    With the exception of research examining the productivity of teams, the empirical study of creativity was until recently almost exclusively focused at the level of the individual creator. Investigators and theorists typically chose to decontextualize the creative process and failed to include a consideration of anyone or anything beyond the person…

  19. Technology Solutions Case Study: Design Guidance for Passive Vents in New Construction, Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.

  20. SRT Status and Plans for Version-7

    NASA Technical Reports Server (NTRS)

    Susskind, Joel; Blaisdell, John; Iredell, Lena; Kouvaris, Louis

    2015-01-01

    The AIRS Science Team Version-6 retrieval algorithm is currently producing level-3 Climate Data Records (CDRs) from AIRS that have been proven useful to scientists in understanding climate processes. CDRs are gridded level-3 products which include all cases passing AIRS Climate QC. SRT has made significant further improvements to AIRS Version-6. Research is continuing at SRT toward the development of AIRS Version-7. At the last Science Team Meeting, we described results using SRT AIRS Version-6.19. SRT Version-6.19 is now an official build at JPL called 6.2. SRTs latest version is AIRS Version-6.22. We have also adapted AIRS Version-6.22 to run with CrISATMS. AIRS Version-6.22 and CrIS Version- 6.22 both run now on JPL computers, but are not yet official builds. The main reason for finalization of Version-7, and using it in the relatively near future for the future processing and reprocessing of old AIRS data, is to produce even better CDRs for use by climate scientists. For this reason all results shown in this talk use only AIRS Climate QC.

  1. Beyond crisis resource management: new frontiers in human factors training for acute care medicine.

    PubMed

    Petrosoniak, Andrew; Hicks, Christopher M

    2013-12-01

    Error is ubiquitous in medicine, particularly during critical events and resuscitation. A significant proportion of adverse events can be attributed to inadequate team-based skills such as communication, leadership, situation awareness and resource utilization. Aviation-based crisis resource management (CRM) training using high-fidelity simulation has been proposed as a strategy to improve team behaviours. This review will address key considerations in CRM training and outline recommendations for the future of human factors education in healthcare. A critical examination of the current literature yields several important considerations to guide the development and implementation of effective simulation-based CRM training. These include defining a priori domain-specific objectives, creating an immersive environment that encourages deliberate practice and transfer-appropriate processing, and the importance of effective team debriefing. Building on research from high-risk industry, we suggest that traditional CRM training may be augmented with new training techniques that promote the development of shared mental models for team and task processes, address the effect of acute stress on team performance, and integrate strategies to improve clinical reasoning and the detection of cognitive errors. The evolution of CRM training involves a 'Triple Threat' approach that integrates mental model theory for team and task processes, training for stressful situations and metacognition and error theory towards a more comprehensive training paradigm, with roots in high-risk industry and cognitive psychology. Further research is required to evaluate the impact of this approach on patient-oriented outcomes.

  2. Republished: Building a culture of safety through team training and engagement.

    PubMed

    Thomas, Lily; Galla, Catherine

    2013-07-01

    Medical errors continue to occur despite multiple strategies devised for their prevention. Although many safety initiatives lead to improvement, they are often short lived and unsustainable. Our goal was to build a culture of patient safety within a structure that optimised teamwork and ongoing engagement of the healthcare team. Teamwork impacts the effectiveness of care, patient safety and clinical outcomes, and team training has been identified as a strategy for enhancing teamwork, reducing medical errors and building a culture of safety in healthcare. Therefore, we implemented Team Strategies and Tools to Enhance Performance and Patient Safety (TeamSTEPPS), an evidence-based framework which was used for team training to create transformational and/or incremental changes; facilitating transformation of organisational culture, or solving specific problems. To date, TeamSTEPPS (TS) has been implemented in 14 hospitals, two Long Term Care Facilities, and outpatient areas across the North Shore LIJ Health System. 32 150 members of the healthcare team have been trained. TeamSTEPPS was piloted at a community hospital within the framework of the health system's organisational care delivery model, the Collaborative Care Model to facilitate sustainment. AHRQ's Hospital Survey on Patient Safety Culture, (HSOPSC), was administered before and after implementation of TeamSTEPPS, comparing the perception of patient safety by the heathcare team. Pilot hospital results of HSOPSC show significant improvement from 2007 (pre-TeamSTEPPS) to 2010. System-wide results of HSOPSC show similar trends to those seen in the pilot hospital. Valuable lessons for organisational success from the pilot hospital enabled rapid spread of TeamSTEPPS across the rest of the health system.

  3. Building a culture of safety through team training and engagement.

    PubMed

    Thomas, Lily; Galla, Catherine

    2013-05-01

    Medical errors continue to occur despite multiple strategies devised for their prevention. Although many safety initiatives lead to improvement, they are often short lived and unsustainable. Our goal was to build a culture of patient safety within a structure that optimised teamwork and ongoing engagement of the healthcare team. Teamwork impacts the effectiveness of care, patient safety and clinical outcomes, and team training has been identified as a strategy for enhancing teamwork, reducing medical errors and building a culture of safety in healthcare. Therefore, we implemented Team Strategies and Tools to Enhance Performance and Patient Safety (TeamSTEPPS), an evidence-based framework which was used for team training to create transformational and/or incremental changes; facilitating transformation of organisational culture, or solving specific problems. To date, TeamSTEPPS (TS) has been implemented in 14 hospitals, two Long Term Care Facilities, and outpatient areas across the North Shore LIJ Health System. 32 150 members of the healthcare team have been trained. TeamSTEPPS was piloted at a community hospital within the framework of the health system's organisational care delivery model, the Collaborative Care Model to facilitate sustainment. AHRQ's Hospital Survey on Patient Safety Culture, (HSOPSC), was administered before and after implementation of TeamSTEPPS, comparing the perception of patient safety by the heathcare team. Pilot hospital results of HSOPSC show significant improvement from 2007 (pre-TeamSTEPPS) to 2010. System-wide results of HSOPSC show similar trends to those seen in the pilot hospital. Valuable lessons for organisational success from the pilot hospital enabled rapid spread of TeamSTEPPS across the rest of the health system.

  4. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  5. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  6. Excavationless Exterior Foundation Insulation Field Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schirber, T.; Mosiman, G.; Ojczyk, C.

    Building science research supports installing exterior (soil side) foundation insulation as the optimal method to enhance the hygrothermal performance of new homes. With exterior foundation insulation, water management strategies are maximized while insulating the basement space and ensuring a more even temperature at the foundation wall. However, such an approach can be very costly and disruptive when applied to an existing home, requiring deep excavation around the entire house. The NorthernSTAR Building America Partnership team implemented an innovative, minimally invasive foundation insulation upgrade technique on an existing home. The approach consisted of using hydrovac excavation technology combined with a liquidmore » insulating foam. The team was able to excavate a continuous 4" wide by 4' to 5' deep trench around the entire house, 128 linear feet, except for one small part under the stoop that was obstructed with concrete debris. The combination pressure washer and vacuum extraction technology also enabled the elimination of large trenches and soil stockpiles normally produced by backhoe excavation. The resulting trench was filled with liquid insulating foam, which also served as a water-control layer of the assembly. The insulation was brought above grade using a liquid foam/rigid foam hybrid system and terminated at the top of the rim joist. Cost savings over the traditional excavation process ranged from 23% to 50%. The excavationless process could result in even greater savings since replacement of building structures, exterior features, utility meters, and landscaping would be minimal or non-existent in an excavationless process.« less

  7. Excavationless Exterior Foundation Insulation Field Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schirber, T.; Mosiman, G.; Ojczyk, C.

    Building science research supports installing exterior (soil side) foundation insulation as the optimal method to enhance the hygrothermal performance of new homes. With exterior foundation insulation, water management strategies are maximized while insulating the basement space and ensuring a more even temperature at the foundation wall. However, such an approach can be very costly and disruptive when applied to an existing home, requiring deep excavation around the entire house. The NorthernSTAR Building America Partnership team implemented an innovative, minimally invasive foundation insulation upgrade technique on an existing home. The approach consisted of using hydrovac excavation technology combined with liquid insulatingmore » foam. The team was able to excavate a continuous 4 inches wide by 4 feet to 5 feet deep trench around the entire house, 128 linear feet, except for one small part under the stoop that was obstructed with concrete debris. The combination pressure washer and vacuum extraction technology also enabled the elimination of large trenches and soil stockpiles normally produced by backhoe excavation. The resulting trench was filled with liquid insulating foam, which also served as a water-control layer of the assembly. The insulation was brought above grade using a liquid foam/rigid foam hybrid system and terminated at the top of the rim joist. Cost savings over the traditional excavation process ranged from 23% to 50%. The excavationless process could result in even greater savings since replacement of building structures, exterior features, utility meters, and landscaping would be minimal or non-existent in an excavationless process.« less

  8. A Value Analysis of Lean Processes in Target Value Design and Integrated Project Delivery.

    PubMed

    Nanda, Upali; K Rybkowski, Zofia; Pati, Sipra; Nejati, Adeleh

    2017-04-01

    To investigate what key stakeholders consider to be the advantages and the opportunities for improvement in using lean thinking and tools in the integrated project delivery (IPD) process. A detailed literature review was followed by case study of a Lean-IPD project. Interviews with members of the project leadership team, focus groups with the integrated team as well as the design team, and an online survey of all stakeholders were conducted. Statistical analysis and thematic content analysis were used to analyze the data, followed by a plus-delta analysis. (1) Learning is a large, implicit benefit of Lean-IPD that is not currently captured by any success metric; (2) the cardboard mock-up was the most successful lean strategy; (3) although a collaborative project, the level of influence of different stakeholder groups was perceived to be different by different stakeholders; (4) overall, Lean-IPD was rated as better than traditional design-bid-build methods; and (5) opportunities for improvement reported were increase in accurate cost estimating, more efficient use of time, perception of imbalance of control/influence, and need for facilitation (which represents different points of view). While lean tools and an IPD method are preferred to traditional design-bid-build methods, the perception of different stakeholders varies and more work needs to be done to allow a truly shared decision-making model. Learning was identified as one of the biggest advantages.

  9. Wind-powered electrical systems : highway rest areas, weigh stations, and team section buildings.

    DOT National Transportation Integrated Search

    2009-02-01

    This project considered the use of wind for providing electrical power at Illinois Department of Transportation : (IDOT) highway rest areas, weigh stations, and team section buildings. The goal of the project was to determine : the extent to which wi...

  10. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  11. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  12. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  13. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  14. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  15. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  16. Building the Program Office Team

    DTIC Science & Technology

    2012-02-01

    Defense AT&L: January–February 2012 42 Building the Program Office Team Owen Gadeken When discussing an acquisition program, we often focus on the...status as well as relay his personal thoughts and feelings about what was going on. Even though he was a strong introvert , this leader also spent a...good portion of his of- fice time walking around and having informal chats with team members in their work areas. He not only learned what was

  17. Lean methodology in health care.

    PubMed

    Kimsey, Diane B

    2010-07-01

    Lean production is a process management philosophy that examines organizational processes from a customer perspective with the goal of limiting the use of resources to those processes that create value for the end customer. Lean manufacturing emphasizes increasing efficiency, decreasing waste, and using methods to decide what matters rather than accepting preexisting practices. A rapid improvement team at Lehigh Valley Health Network, Allentown, Pennsylvania, implemented a plan, do, check, act cycle to determine problems in the central sterile processing department, test solutions, and document improved processes. By using A3 thinking, a consensus building process that graphically depicts the current state, the target state, and the gaps between the two, the team worked to improve efficiency and safety, and to decrease costs. Use of this methodology has increased teamwork, created user-friendly work areas and processes, changed management styles and expectations, increased staff empowerment and involvement, and streamlined the supply chain within the perioperative area. Copyright (c) 2010 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  18. Forcing Interoperability: An Intentionally Fractured Approach

    NASA Astrophysics Data System (ADS)

    Gallaher, D. W.; Brodzik, M.; Scambos, T.; Stroeve, J.

    2008-12-01

    The NSIDC is attempting to rebuild a significant portion of its public-facing cyberinfrastructure to better meet the needs expressed by the cryospheric community. The project initially addresses a specific science need - understanding Greenland's contribution to global sea level rise through comparison and analysis of variables such as temperature, albedo, melt, ice velocity and surface elevation. This project will ultimately be expanded to cover most of NSIDC's cryospheric data. Like many organizations, we need to provide users with data discovery interfaces, collaboration tools and mapping services. Complicating this effort is the need to reduce the volume of raw data delivered to the user. Data growth, especially with time-series data, will overwhelm our software, processors and network like never before. We need to provide the users the ability to perform first level analysis directly on our site. In order to accomplish this, the users should be free to modify the behavior of these tools as well as incorporate their own tools and analysis to meet their needs. Rather than building one monolithic project to build this system, we have chosen to build three semi-independent systems. One team is building a data discovery and web based distribution system, the second is building an advanced analysis and workflow system and the third is building a customized web mapping service. These systems will use the same underlying data structures and services but will employ different technologies and teams to build their objectives, schedules and user interfaces. Obviously, we are adding complexity and risk to the overall project however this may be the best method to achieve interoperability because the development teams will be required to build off each others work. The teams will be forced to design with other users in mind as opposed to building interoperability as an afterthought, which a tendency in monolithic systems. All three teams will take advantage of preexisting software and standards whenever possible. We present this topic to stimulate discussion within the development, operational and research communities on how best to proceed.

  19. Clinical Immersion: An Approach for Fostering Cross-disciplinary Communication and Innovation in Nursing and Engineering Students.

    PubMed

    Geist, Melissa J; Sanders, Robby; Harris, Kevin; Arce-Trigatti, Andrea; Hitchcock-Cass, Cary

    2018-05-24

    A faculty team from nursing and chemical engineering developed a course that brought together students from each discipline for cross-disciplinary, team-based clinical immersion and collaboration. Health care processes and devices are rapidly changing, and nurses are uniquely positioned to be bedside innovators to improve patient care delivery. During each clinical immersion, the student teams rotated through various hospital units where they identified problems and worked together in the university's makerspace (iMaker Space) to design and build prototypes to improve health outcomes. Data from the Critical thinking Assessment Test provided evidence of gains in critical-thinking and problem-solving skills, while the problems identified in the clinical setting and prototypes developed demonstrated the impact of bringing nursing and engineering students together to design innovations. When challenged to identify authentic problems during their clinical immersion, the teams of nursing and engineering students proposed creative solutions and developed commercially viable prototypes.

  20. Towards a Methodology for Managing Competencies in Virtual Teams - A Systemic Approach

    NASA Astrophysics Data System (ADS)

    Schumacher, Marinita; Stal-Le Cardinal, Julie; Bocquet, Jean-Claude

    Virtual instruments and tools are future trends in Engineering which are a response to the growing complexity of engineering tasks, the facility of communication and strong collaborations on the international market. Outsourcing, off-shoring, and the globalization of organisations’ activities have resulted in the formation of virtual product development teams. Individuals who are working in virtual teams must be equipped with diversified competencies that provide a basis for virtual team building. Thanks to the systemic approach of the functional analysis our paper responds to the need of a methodology of competence management to build virtual teams that are active in virtual design projects in the area of New Product Development (NPD).

  1. Data quality objectives for the initial fuel conditioning examinations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, L.A.

    The Data Quality Objectives (DQOs) were established for the response of the first group of fuel samples shipped from the K West Basin to the Hanford 327 Building hot cells for examinations to the proposed Path Forward conditioning process. Controlled temperature and atmosphere furnace testing testing will establish performance parameters using the conditioning process (drying, sludge drying, hydride decomposition passivation) proposed by the Independent Technical Assessment (ITA) Team as the baseline.

  2. Building the team for team science

    USGS Publications Warehouse

    Read, Emily K.; O'Rourke, M.; Hong, G. S.; Hanson, P. C.; Winslow, Luke A.; Crowley, S.; Brewer, C. A.; Weathers, K. C.

    2016-01-01

    The ability to effectively exchange information and develop trusting, collaborative relationships across disciplinary boundaries is essential for 21st century scientists charged with solving complex and large-scale societal and environmental challenges, yet these communication skills are rarely taught. Here, we describe an adaptable training program designed to increase the capacity of scientists to engage in information exchange and relationship development in team science settings. A pilot of the program, developed by a leader in ecological network science, the Global Lake Ecological Observatory Network (GLEON), indicates that the training program resulted in improvement in early career scientists’ confidence in team-based network science collaborations within and outside of the program. Fellows in the program navigated human-network challenges, expanded communication skills, and improved their ability to build professional relationships, all in the context of producing collaborative scientific outcomes. Here, we describe the rationale for key communication training elements and provide evidence that such training is effective in building essential team science skills.

  3. Improving Care Teams' Functioning: Recommendations from Team Science.

    PubMed

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  4. Buildings | NREL

    Science.gov Websites

    the energy efficiency of both residential and commercial buildings, and to accelerate the integration Commercial Buildings team focuses on providing large institutional and private sector commercial building

  5. Building Team Belay

    DTIC Science & Technology

    2014-09-01

    information, including suggestions for reducing this burden, to Washington headquarters Services, Directorate for Information Operations and Reports... remunerations actuating one to conform to group mores.6 4 Institute of Medicine, Building a... remunerations actuating one to conform to group mores. The social support that is elemental among “home” emergency response teams can be viewed and

  6. Center for the Built Environment: Research on Indoor Environmental Quality

    Science.gov Websites

    Comfort System Speech Privacy Task Ambient Conditioning Team Space Design Study Thermal Comfort Automotive resulting from HVAC, building, and facade design decisions. Acoustical Analysis in Office Environments Using building energy. The Impact of Team Space Design on Collaboration Assessing individual and group worker

  7. Team Building. Baldor Electric Company. [Facilitator Guide and Participant Guide.

    ERIC Educational Resources Information Center

    Saint Louis Community Coll., MO. Workplace Literacy Services Center.

    This document contains the facilitator and participant guides for a course in team building that was developed by a community college for a St. Louis (Missouri) electric company. The facilitator's guide contains the transparency masters, outlines, learning activities, questionnaires, and other handouts required for two course sessions. The first…

  8. 77 FR 77087 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes....starr- September 12, 2012... 390182 areas of Fulton Genter, Street, Wauseon, team.com/starr/LOMR/ County.... team.com/starr/LOMR/ Village of Delta, Pages/RegionV.aspx. 401 Main Street, Delta, OH 34515. Oklahoma...

  9. Team Building Concepts.

    ERIC Educational Resources Information Center

    Massachusetts Career Development Inst., Springfield.

    This booklet is one of six texts from a workplace literacy curriculum designed to assist learners in facing the increased demands of the workplace. It briefly explains how team building concepts affect businesses in new ways and how they help create an environment that provides job satisfaction for everyone and high-quality products for the…

  10. Introduction to Textiles for Team Building. Workforce 2000 Partnership.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This curriculum package on introduction to textiles for team building for all associates has been developed by the Workforce 2000 Partnership, a network of industries and educational institutions that provides training in communication, computation, and creative thinking to employees and supervisors in textile, apparel, and carpet industries at 15…

  11. Generating Effective Facilitation Questions for Team-Building/Personal-Challenge Activities

    ERIC Educational Resources Information Center

    Gabbei, Ritchie

    2004-01-01

    Team-building/personal-challenge (TB/PC) activities have become popular ways to address students' interpersonal and intrapersonal skills and abilities associated with the affective domain. The outcomes associated with TB/PC activities are often best experienced and learned through the use of indirect methods of instruction. Typically, many…

  12. What Principals Should Know about Building and Maintaining Teams

    ERIC Educational Resources Information Center

    Turk, Randall L.; Wolff, Krista; Waterbury, Christopher; Zumalt, Jon

    2002-01-01

    A field study conducted by 8 students and a faculty supervisor of a principal preparation program determined that individual and team reflection resulted in shared learning from team training and ongoing team activities. An industrial concept known as value-chain teams has implications for monitoring student progress from kindergarten through…

  13. 23 CFR 636.118 - Is team switching allowed after contract award?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...

  14. 23 CFR 636.118 - Is team switching allowed after contract award?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...

  15. 23 CFR 636.118 - Is team switching allowed after contract award?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...

  16. 23 CFR 636.118 - Is team switching allowed after contract award?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...

  17. 23 CFR 636.118 - Is team switching allowed after contract award?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Is team switching allowed after contract award? 636.118... TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.118 Is team switching allowed after contract...-builder, team member switching (adding or switching team members) is discouraged after contract award...

  18. Hamline/3M Corp. Project: Liason for Curricular Change*

    NASA Astrophysics Data System (ADS)

    Artz, Jerry L.

    2002-04-01

    This project was designed to catalyze curricular changes to better prepare students for the workplace. Industrial managers provided a list of 16 characteristics valued in the workplace; most were NOT related to science course content. The project formed 5 teams each including 3M professionals and students. Each team developed curricular changes in one of the 16 areas. Team goals were to improve skills in communication, data analysis, business/economics, team problem solving, and cultural competency. Curricular changes realized include communication skill activities embodied in science courses and faculty communication teaching skill seminars; self learning tools in data analysis, statistics and model building; a new course developed with assistance from 3M personnel focusing on topics directly related to technological industries; high performance team problem solving training/coaching for faculty; workshops for students and faculty relative to importance of cultural competencies in the workplace; and a new course focusing on culture, team problem solving and conflict resolution in the technical workplace. Process for developing and content of curricular changes will be reported. *Thanks to: NSF GOALI CHE-99010782

  19. Nurse Perceptions of Artists as Collaborators in Interprofessional Care Teams

    PubMed Central

    Pesata, Virginia; Lee, Jenny Baxley; Graham-Pole, John

    2017-01-01

    Increased attention is being given to interprofessional collaboration in healthcare, which has been shown to improve patient satisfaction, patient safety, healthcare processes, and health outcomes. As the arts and artists are being more widely incorporated into healthcare settings throughout the world, professional artists are contributing to interprofessional care teams. A secondary directed content analysis of interviews with 31 nurses on a medical-surgical care unit investigated the roles and impacts of professional artists on the interprofessional care team. The investigation utilized established domains of interprofessional care, including values and ethics, roles and responsibilities, interprofessional communication, and teams and teamwork, and created the domain of quality of care. Findings suggest that artists are valued by nurses as members of the interprofessional care team, that they enhance the provision of patient-centered care, and that they improve quality of care by providing holistic dimensions of caring, including cognitive and social engagement, and meaningful interaction. The presence of artists on interprofessional teams provides a cost-effective and welcome resource for clinical staff and builds a culture in which creativity and interdisciplinary collaboration are more highly valued and activated. PMID:28867778

  20. Value of Collaboration With Standardized Patients and Patient Facilitators in Enhancing Reflection During the Process of Building a Simulation.

    PubMed

    Stanley, Claire; Lindsay, Sally; Parker, Kathryn; Kawamura, Anne; Samad Zubairi, Mohammad

    2018-05-09

    We previously reported that experienced clinicians find the process of collectively building and participating in simulations provide (1) a unique reflective opportunity; (2) a venue to identify different perspectives through discussion and action in a group; and (3) a safe environment for learning. No studies have assessed the value of collaborating with standardized patients (SPs) and patient facilitators (PFs) in the process. In this work, we describe this collaboration in building a simulation and the key elements that facilitate reflection. Three simulation scenarios surrounding communication were built by teams of clinicians, a PF, and SPs. Six build sessions were audio recorded, transcribed, and thematically analyzed through an iterative process to (1) describe the steps of building a simulation scenario and (2) identify the key elements involved in the collaboration. The five main steps to build a simulation scenario were (1) storytelling and reflection; (2) defining objectives and brainstorming ideas; (3) building a stem and creating a template; (4) refining the scenario with feedback from SPs; and (5) mock run-throughs with follow-up discussion. During these steps, the PF shared personal insights, challenging participants to reflect deeper to better understand and consider the patient's perspective. The SPs provided unique outside perspective to the group. In addition, the interaction between the SPs and the PF helped refine character roles. A collaborative approach incorporating feedback from PFs and SPs to create a simulation scenario is a valuable method to enhance reflective practice for clinicians.

  1. MACBETH: Development of a Training Game for the Mitigation of Cognitive Bias

    ERIC Educational Resources Information Center

    Dunbar, Norah E.; Wilson, Scott N.; Adame, Bradley J.; Elizondo, Javier; Jensen, Matthew L.; Miller, Claude H.; Kauffman, Abigail Allums; Seltsam, Toby; Bessarabova, Elena; Vincent, Cindy; Straub, Sara K.; Ralston, Ryan; Dulawan, Christopher L.; Ramirez, Dennis; Squire, Kurt; Valacich, Joseph S.; Burgoon, Judee K.

    2013-01-01

    This paper describes the process of rapid iterative prototyping used by a research team developing a training video game for the Sirius program funded by the Intelligence Advanced Research Projects Activity (IARPA). Described are three stages of development, including a paper prototype, and builds for alpha and beta testing. Game development is…

  2. NREL Research Team Wins R&D 100 Award | News | NREL

    Science.gov Websites

    performance PV modules for large-scale solar power plants, commercial and residential buildings, and off-grid Laboratory (NREL) and First Solar have been selected to receive a 2003 R&D 100 award from R&D Magazine for developing a new process for depositing semiconductor layers onto photovoltaic (PV) modules

  3. Design Thinking: A Process for Developing and Implementing Lasting District Reform. Knowledge Brief

    ERIC Educational Resources Information Center

    Rice, Erik

    2011-01-01

    Traditionally, challenges such as how to sustain district reform, how to build a leadership pipeline, how to create an integrated project, or how to best intervene with struggling students would be resolved with a team of "experts" developing a solution in isolation of the stakeholders involved. By contrast, design thinking centers on the…

  4. Improving supervision: a team approach.

    PubMed

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  5. Academic Primer Series: Five Key Papers about Team Collaboration Relevant to Emergency Medicine.

    PubMed

    Gottlieb, Michael; Grossman, Catherine; Rose, Emily; Sanderson, William; Ankel, Felix; Swaminathan, Anand; Chan, Teresa M

    2017-02-01

    Team collaboration is an essential for success both within academics and the clinical environment. Often, team collaboration is not explicitly taught during medical school or even residency, and must be learned during one's early career. In this article, we aim to summarize five key papers about team collaboration for early career clinician educators. We conducted a consensus-building process among the writing team to generate a list of key papers that describe the importance or significance of team collaboration, seeking input from social media sources. The authors then used a three-round voting methodology akin to a Delphi study to determine the most important papers from the initially generated list. The five most important papers on the topic of team collaboration, as determined by this mixed group of junior faculty members and faculty developers, are presented in this paper. For each included publication, a summary was provided along with its relevance to junior faculty members and faculty developers. Five key papers about team collaboration are presented in this publication. These papers provide a foundational background to help junior faculty members with collaborating in teams both clinically and academically. This list may also inform senior faculty and faculty developers about the needs of junior faculty members.

  6. Team sponsors in community-based health leadership programs.

    PubMed

    Patterson, Tracy Enright; Dinkin, Donna R; Champion, Heather

    2017-05-02

    Purpose The purpose of this article is to share the lessons learned about the role of team sponsors in action-learning teams as part of community-based health leadership development programs. Design/methodology/approach This case study uses program survey results from fellow participants, action learning coaches and team sponsors to understand the value of sponsors to the teams, the roles they most often filled and the challenges they faced as team sponsors. Findings The extent to which the sponsors were perceived as having contributed to the work of the action learning teams varied greatly from team to team. Most sponsors agreed that they were well informed about their role. The roles sponsors most frequently played were to provide the teams with input and support, serve as a liaison to the community and serve as a sounding board, motivator and cheerleader. The most common challenges or barriers team sponsors faced in this role were keeping engaged in the process, adjusting to the role and feeling disconnected from the program. Practical implications This work provides insights for program developers and community foundations who are interested in building the capacity for health leadership by linking community sponsors with emerging leaders engaged in an action learning experience. Originality/value This work begins to fill a gap in the literature. The role of team sponsors has been studied for single organization work teams but there is a void of understanding about the role of sponsors with multi-organizational teams working to improve health while also learning about leadership.

  7. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  8. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  9. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  10. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  11. 15 CFR 270.101 - Preliminary reconnaissance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.101 Preliminary reconnaissance. (a) To... the site of a building failure. The Director may establish and deploy a Team to conduct the...

  12. Understanding Implementation of Complex Interventions in Primary Care Teams.

    PubMed

    Luig, Thea; Asselin, Jodie; Sharma, Arya M; Campbell-Scherer, Denise L

    2018-01-01

    The implementation of interventions to support practice change in primary care settings is complex. Pragmatic strategies, grounded in empiric data, are needed to navigate real-world challenges and unanticipated interactions with context that can impact implementation and outcomes. This article uses the example of the "5As Team" randomized control trial to explore implementation strategies to promote knowledge transfer, capacity building, and practice integration, and their interaction within the context of an interdisciplinary primary care team. We performed a qualitative evaluation of the implementation process of the 5As Team intervention study, a randomized control trial of a complex intervention in primary care. We conducted thematic analysis of field notes of intervention sessions, log books of the practice facilitation team members, and semistructured interviews with 29 interdisciplinary clinician participants. We used and further developed the Interactive Systems Framework for dissemination and implementation to interpret and structure findings. Three themes emerged that illuminate interactions between implementation processes, context, and outcomes: (1) facilitating team communication supported collective and individual sense-making and adoption of the innovation, (2) iterative evaluation of the implementation process and real-time feedback-driven adaptions of the intervention proved crucial for sustainable, context-appropriate intervention impact, (3) stakeholder engagement led to both knowledge exchange that contributes to local problem solving and to shaping a clinical context that is supportive to practice change. Our findings contribute pragmatic strategies that can help practitioners and researchers to navigate interactions between context, intervention, and implementation factors to increase implementation success. We further developed an implementation framework that includes sustained engagement with stakeholders, facilitation of team sense-making, and dynamic evaluation and intervention design as integral parts of complex intervention implementation. NCT01967797. 18 October 2013. © Copyright 2018 by the American Board of Family Medicine.

  13. Mission possible: Building an effective business continuity team in seven steps.

    PubMed

    Porter, David

    2016-01-01

    Several books and studies exist on the creation, development and benefits of high-performing teams; many others offer insights into the business continuity management (BCM) discipline, crisis response and planning. Very rarely, however, do they cover both. This paper will explore the seven main development areas that helped build the foundation for a successful and high-performing BCM team in the Australian Taxation Office. Practical, actionable advice will be provided, recognising that the task for those starting out can be quite daunting and complex.

  14. Home field advantage: new stadium construction and team performance in professional sports.

    PubMed

    Watson, Jack C; Krantz, Andrew J

    2003-12-01

    To identify the relations between new stadiums and home team performance and attendance for professional baseball (MLB) (n=14), basketball (NBA) (n=13), and football (NFL) (n=25) teams in the USA since 1950 dependent t tests assessed significance of increases in attendance in both MLB and the NBA and a significantly improved home winning percentage in MLB following the building of new stadiums. Implications include a better understanding of the rationales used by owners, fans, and players for building new stadiums.

  15. A collaborative approach to team building between staff and students in long-term care.

    PubMed

    Freiburger, O A

    1996-01-01

    Nursing staff and student interactions were not facilitating a system of care that reflected a team effort. Nursing staff and students were involved in efforts to resolve issues that influenced their professional relationships through use of a problem-solving approach. Team-building strategies were implemented, relationships improved, and collaboration increased between nursing staff members and students. Results of this project have implications for the socialization of nursing students and the development of professional relationships in clinical settings.

  16. Leading the Team You Inherit.

    PubMed

    Watkins, Michael D

    2016-06-01

    Most leaders don't have the luxury of building their teams from scratch. Instead they're put in charge of an existing group, and they need guidance on the best way to take over and improve performance. Watkins, an expert on transitions, suggests a three-step approach: Assess. Act quickly to size up the personnel you've inherited, systematically gathering data from one-on-one chats, team meetings, and other sources. Reflect, too, on the business challenges you face, the kinds of people you want in various roles, and the degree to which they need to collaborate. Reshape. Adjust the makeup of the team by moving people to new positions, shifting their responsibilities, or replacing them. Make sure that everyone is aligned on goals and how to achieve them--you may need to change the team's stated direction. Consider also making changes in the way the team operates (reducing the frequency of meetings, for example, or creating new subteams). Then establish ground rules and processes to sustain desired behaviors, and revisit those periodically. Accelerate team development. Set your people up for some early wins. Initial successes will boost everyone's confidence and reinforce the value of your new operating model, thus paving the way for ongoing growth.

  17. Achieving Energy Savings in Municipal Construction in Long Beach, CA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrish, Kristen; Regnier, Cindy

    Long Beach Gas and Oil (LBGO), the public gas utility in Long Beach, California, partnered with the U.S. Department of Energy (DOE) to develop and implement solutions to build a new, low-energy modular office building that is at least 50% below requirements set by Energy Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) program.3 The LBGO building, which demonstrates that modular construction can be very energy efficient, is expected to exceed the ASHRAEmore » baseline by about 45%. The new 15,000-square foot (ft2) LBGO office building has two stories and houses private offices, open-plan cubicle offices, and a conference room and call center on the second floor. The building’s modular nature allowed LBGO to realize the cost benefits of fasttracked construction while saving substantial energy and reducing operational costs. The project was funded by the utility’s ratepayer revenue, which imposed a tight budget limit. The design process was a collaborative effort involving LBGO and its design-build team, Lawrence Berkeley National Laboratory (Berkeley Lab), and subcontractors Stantec (formerly Burt Hill) and LHB Inc. The team proposed efficiency measures based on computer modeling of the building in full compliance with ASHRAE 90.1-2007; in the modeled building, the lighting and cooling systems were the largest energy users, so increasing the efficiency of these systems was a top priority. Promising measures were modeled to estimate their energy performance, and each measure was evaluated for its feasibility within the budget.« less

  18. Teams in Education: Creating an Integrated Approach.

    ERIC Educational Resources Information Center

    Arcaro, Jerome S.

    This handbook is designed to help educational professionals develop cross-functional or departmental quality teams. Nine chapters focus on: (1) the concept of Total Quality Management (TQM) and 14 points for quality in education; (2) team goals and formation; (3) stages of successful team building; (4) the development of quality task teams; (5)…

  19. 78 FR 32676 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes...://www.rampp-team.com/ September 23, 2013........ 050084 Springs (13-06- Ruth Carney, 111 Opera lomrs.htm... http://www.rampp-team.com/ July 25, 2013 340343 Hanover (12-02- Ronald F. Engineering lomrs.htm. 1077P...

  20. Team Building for Youth Sport

    ERIC Educational Resources Information Center

    Bloom, Gordon A.; Loughead, Todd M.; Newin, Julie

    2008-01-01

    Participation in youth sport generally begins to decline after the age of 12. Among the reasons for this are personal aspects such as lack of desire, and social aspects including negative experiences with coaches. One way that coaches can improve the sporting environment is through group activities that promote team building. The purpose of this…

  1. 78 FR 10195 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes...- March 6, 2013 090072 Falls (12-01- Gerald F. Hall, 10 Maple team.com/starr/ 1573P). Smith, First Avenue...://www.starr- March 27, 2013 160090 (11-10-1574P). Nancy Chaney, Development, 221 team.com/starr/LOMR...

  2. NREL's Energy Storage and REopt Teams Awarded $525k from TCF to Study

    Science.gov Websites

    Commercial Viability of Optimal, Reliable Building-Integrated Energy Storage | News | NREL NREL's Energy Storage and REopt Teams Awarded $525k from TCF to Study Commercial Viability of Optimal Study Commercial Viability of Optimal, Reliable Building-Integrated Energy Storage November 14, 2017

  3. Success Skills for the Textile Industry: Team Building (SS2). Workforce 2000 Partnership.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This curriculum package on team building is a product of the Workforce 2000 Partnership, which combined the resources of four educational partners and four industrial partners in Alabama, Georgia, and South Carolina to provide education and training in communication, computation, and critical thinking to employees in the apparel, carpet, and…

  4. It's Salsa Time! A Team Activity

    ERIC Educational Resources Information Center

    Crowne, Kerri Anne

    2017-01-01

    This article provides information on a team-building activity in which student teams make salsa. I usually use this exercise on the day that I form teams to provide an opportunity for teams to work on something that is not graded prior to completing the graded team assignment. The activity is built on several theories, such as social learning,…

  5. Developing Your Dream Team

    ERIC Educational Resources Information Center

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  6. 15 CFR 270.202 - Coordination with search and rescue efforts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.202 Coordination with search and... efforts being undertaken at the site of the building failure, including FEMA urban search and rescue teams...

  7. 15 CFR 270.202 - Coordination with search and rescue efforts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.202 Coordination with search and... efforts being undertaken at the site of the building failure, including FEMA urban search and rescue teams...

  8. 15 CFR 270.202 - Coordination with search and rescue efforts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.202 Coordination with search and... efforts being undertaken at the site of the building failure, including FEMA urban search and rescue teams...

  9. 15 CFR 270.202 - Coordination with search and rescue efforts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.202 Coordination with search and... efforts being undertaken at the site of the building failure, including FEMA urban search and rescue teams...

  10. 15 CFR 270.202 - Coordination with search and rescue efforts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.202 Coordination with search and... efforts being undertaken at the site of the building failure, including FEMA urban search and rescue teams...

  11. Building customer capital through knowledge management processes in the health care context.

    PubMed

    Liu, Sandra S; Lin, Carol Yuh-Yun

    2007-01-01

    Customer capital is a value generated and an asset developed from customer relationships. Successfully managing these relationships is enhanced by knowledge management (KM) infrastructure that captures and transfers customer-related knowledge. The execution of such a system relies on the vision and determination of the top management team (TMT). The health care industry in today's knowledge economy encounters similar challenges of consumerism as its business sector. Developing customer capital is critical for hospitals to remain competitive in the market. This study aims to provide taxonomy for cultivating market-based organizational learning that leads to building of customer capital and attaining desirable financial performance in health care. With the advancement of technology, the KM system plays an important moderating role in the entire process. The customer capital issue has not been fully explored either in the business or the health care industry. The exploratory nature of such a pursuit calls for a qualitative approach. This study examines the proposed taxonomy with the case hospital. The lessons learned also are reflected with three US-based health networks. The TMT incorporated the knowledge process of conceptualization and transformation in their organizational mission. The market-oriented learning approach promoted by TMT helps with the accumulation and sharing of knowledge that prepares the hospital for the dynamics in the marketplace. Their key knowledge advancement relies on both the professional arena and the feedback of customers. The institutionalization of the KM system and organizational culture expands the hospital's customer capital. The implication is twofold: (1) the TMT is imperative for the success of building customer capital through KM process; and (2) the team effort should be enhanced with a learning culture and sharing spirit, in particular, active nurse participation in decision making and frontline staff's role in providing a delightfully surprising patient experience.

  12. Interagency Collaborative Team Model for Capacity Building to Scale-Up Evidence-Based Practice

    PubMed Central

    Hurlburt, Michael; Aarons, Gregory A; Fettes, Danielle; Willging, Cathleen; Gunderson, Lara; Chaffin, Mark J

    2015-01-01

    Background System-wide scale up of evidence-based practice (EBP) is a complex process. Yet, few strategic approaches exist to support EBP implementation and sustainment across a service system. Building on the Exploration, Preparation, Implementation, and Sustainment (EPIS) implementation framework, we developed and are testing the Interagency Collaborative Team (ICT) process model to implement an evidence-based child neglect intervention (i.e., SafeCare®) within a large children’s service system. The ICT model emphasizes the role of local agency collaborations in creating structural supports for successful implementation. Methods We describe the ICT model and present preliminary qualitative results from use of the implementation model in one large scale EBP implementation. Qualitative interviews were conducted to assess challenges in building system, organization, and home visitor collaboration and capacity to implement the EBP. Data collection and analysis centered on EBP implementation issues, as well as the experiences of home visitors under the ICT model. Results Six notable issues relating to implementation process emerged from participant interviews, including: (a) initial commitment and collaboration among stakeholders, (b) leadership, (c) communication, (d) practice fit with local context, (e) ongoing negotiation and problem solving, and (f) early successes. These issues highlight strengths and areas for development in the ICT model. Conclusions Use of the ICT model led to sustained and widespread use of SafeCare in one large county. Although some aspects of the implementation model may benefit from enhancement, qualitative findings suggest that the ICT process generates strong structural supports for implementation and creates conditions in which tensions between EBP structure and local contextual variations can be resolved in ways that support the expansion and maintenance of an EBP while preserving potential for public health benefit. PMID:27512239

  13. Interagency Collaborative Team Model for Capacity Building to Scale-Up Evidence-Based Practice.

    PubMed

    Hurlburt, Michael; Aarons, Gregory A; Fettes, Danielle; Willging, Cathleen; Gunderson, Lara; Chaffin, Mark J

    2014-04-01

    System-wide scale up of evidence-based practice (EBP) is a complex process. Yet, few strategic approaches exist to support EBP implementation and sustainment across a service system. Building on the Exploration, Preparation, Implementation, and Sustainment (EPIS) implementation framework, we developed and are testing the Interagency Collaborative Team (ICT) process model to implement an evidence-based child neglect intervention (i.e., SafeCare®) within a large children's service system. The ICT model emphasizes the role of local agency collaborations in creating structural supports for successful implementation. We describe the ICT model and present preliminary qualitative results from use of the implementation model in one large scale EBP implementation. Qualitative interviews were conducted to assess challenges in building system, organization, and home visitor collaboration and capacity to implement the EBP. Data collection and analysis centered on EBP implementation issues, as well as the experiences of home visitors under the ICT model. Six notable issues relating to implementation process emerged from participant interviews, including: (a) initial commitment and collaboration among stakeholders, (b) leadership, (c) communication, (d) practice fit with local context, (e) ongoing negotiation and problem solving, and (f) early successes. These issues highlight strengths and areas for development in the ICT model. Use of the ICT model led to sustained and widespread use of SafeCare in one large county. Although some aspects of the implementation model may benefit from enhancement, qualitative findings suggest that the ICT process generates strong structural supports for implementation and creates conditions in which tensions between EBP structure and local contextual variations can be resolved in ways that support the expansion and maintenance of an EBP while preserving potential for public health benefit.

  14. From theory to practice: community health nursing in a public health neighborhood team.

    PubMed

    Westbrook, L O; Schultz, P R

    2000-12-01

    An interdisciplinary team in a local public health district tested its ability to implement the core public health functions of assessment, policy development, and assurance by changing its practice to a community-driven model of building partnerships for health with groups and communities in a designated locale. Evaluation of this innovation revealed that the public health nurse members of the team enacted their community health nursing knowledge to strengthen agency to cocreate health. Interdisciplinary collaboration was essential to the team's community mobilization efforts. Additional findings suggested that this organizational innovation was associated with developing a more participatory organizational climate, increasing system effectiveness, and building community capacity.

  15. Research Library Year in Review 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knudson, Frances Lynn; Varjabedian, Kathryn Ruth; Boorman, Helen A.

    2016 was a year of strategy, analysis and moving forward. We launched January with a strategic planning process. Building on the Lab’s Strategic Plan and Purpose Statement, we created a process that reached out to Lab leadership, scientists & engineers, and Research Library (RL) staff. An external consultant was engaged to help drive the process and to lead a fullday staff retreat. A survey was created and administered to staff, seeking feedback on priorities and direction. A parallel survey was created for stakeholders. Stakeholder questions began with the macro – from the external climate to Lab and division priorities –more » to the micro concerning priorities and directions for the RL. Stakeholders were personally interviewed by teams of two that included an interviewer and a scribe. These thirty-plus interviews were collated into a spreadsheet. A sociologist provided semantic analysis for the feedback, creating an impact document of the interviews. The full day retreat provided an opportunity for staff to build on their feedback as well as stakeholder feedback. A great deal of brainstorming led to categorized priorities and scenarios. The RL Compass Team, encompassing library leadership, moved the next stage of the process forward by taking retreat feedback and creating a first draft of a plan. Two more rounds of feedback with smaller staff groups as well as the Library Advisory Board led to the final plan. The core plan is included in this report.« less

  16. Medical students as EMTs: skill building, confidence and professional formation.

    PubMed

    Kwiatkowski, Thomas; Rennie, William; Fornari, Alice; Akbar, Salaahuddin

    2014-01-01

    The first course of the medical curriculum at the Hofstra North Shore-LIJ School of Medicine, From the Person to the Professional: Challenges, Privileges and Responsibilities, provides an innovative early clinical immersion. The course content specific to the Emergency Medical Technician (EMT) curriculum was developed using the New York State Emergency Medical Technician curriculum. Students gain early legitimate clinical experience and practice clinical skills as team members in the pre-hospital environment. We hypothesized this novel curriculum would increase students' confidence in their ability to perform patient care skills and enhance students' comfort with team-building skills early in their training. Quantitative and qualitative data were collected from first-year medical students (n=97) through a survey developed to assess students' confidence in patient care and team-building skills. The survey was completed prior to medical school, during the final week of the course, and at the end of their first year. A paired-samples t-test was conducted to compare self-ratings on 12 patient care and 12 team-building skills before and after the course, and a theme analysis was conducted to examine open-ended responses. Following the course, student confidence in patient care skills showed a significant increase from baseline (p<0.05) for all identified skills. Student confidence in team-building skills showed a significant increase (p<0.05) in 4 of the 12 identified skills. By the end of the first year, 84% of the first-year students reported the EMT curriculum had 'some impact' to 'great impact' on their patient care skills, while 72% reported the EMT curriculum had 'some impact' to 'great impact' on their team-building skills. The incorporation of EMT training early in a medical school curriculum provides students with meaningful clinical experiences that increase their self-reported level of confidence in the performance of patient care skills early in their medical education.

  17. Synergy Between Individual and Institutional Capacity Building: Examples from the NASA DEVELOP National Program

    NASA Astrophysics Data System (ADS)

    Ross, K. W.; Childs-Gleason, L. M.; Favors, J.; Rogers, L.; Ruiz, M. L.; Allsbrook, K. N.

    2016-12-01

    The NASA DEVELOP National Program seeks to simultaneously build capacity to use Earth observations in early career and transitioning professionals while building capacity with institutional partners to apply Earth observations in conducting operations, making decisions, or informing policy. Engaging professionals in this manner lays the foundation of the NASA DEVELOP experience and provides a fresh perspective into institutional challenges. This energetic engagement of people in the emerging workforce elicits heightened attention and greater openness to new resources and processes from project partners. This presentation will describe how NASA DEVELOP provides over 350 opportunities for individuals to engage with over 140 partners per year. It will discuss how the program employs teaming approaches, logistical support, and access to science expertise to facilitate increased awareness and use of NASA geospatial information. It will conclude with examples of how individual/institutional capacity building synergies have led to useful capacity building outcomes.

  18. Establishing a Southern Swedish Malignant Melanoma OMICS and biobank clinical capability

    PubMed Central

    2013-01-01

    Background The objectives and goals of the Southern Swedish Malignant Melanoma (SSMM) are to develop, build and utilize cutting edge biobanks and OMICS platforms to better understand disease pathology and drug mechanisms. The SSMM research team is a truly cross-functional group with members from oncology, surgery, bioinformatics, proteomics, and genomics initiatives. Within the research team there are members who daily diagnose patients with suspect melanomas, do follow-ups on malignant melanoma patients and remove primary or metastatic lesions by surgery. This inter-disciplinary clinical patient care ensures a competence build as well as a best practice procedure where the patient benefits. Methods Clinical materials from patients before, during and after treatments with clinical end points are being collected. Tissue samples as well as bio-fluid samples such as blood fractions, plasma, serum and whole blood will be archived in 384-high density sample tube formats. Standardized approaches for patient selections, patient sampling, sample-processing and analysis platforms with dedicated protein assays and genomics platforms that will hold value for the research community are used. The patient biobank archives are fully automated with novel ultralow temperature biobank storage units and used as clinical resources. Results An IT-infrastructure using a laboratory information management system (LIMS) has been established, that is the key interface for the research teams in order to share and explore data generated within the project. The cross-site data repository in Lund forms the basis for sample processing, together with biological samples in southern Sweden, including blood fractions and tumor tissues. Clinical registries are associated with the biobank materials, including pathology reports on disease diagnosis on the malignant melanoma (MM) patients. Conclusions We provide data on the developments of protein profiling and targeted protein assays on isolated melanoma tumors, as well as reference blood standards that is used by the team members in the respective laboratories. These pilot data show biobank access and feasibility of performing quantitative proteomics in MM biobank repositories collected in southern Sweden. The scientific outcomes further strengthen the build of healthcare benefit in the complex challenges of malignant melanoma pathophysiology that is addressed by the novel personalized medicines entering the market. PMID:23445834

  19. Establishing a Southern Swedish Malignant Melanoma OMICS and biobank clinical capability.

    PubMed

    Welinder, Charlotte; Jönsson, Göran; Ingvar, Christian; Lundgren, Lotta; Olsson, Håkan; Breslin, Thomas; Végvári, Akos; Laurell, Thomas; Rezeli, Melinda; Jansson, Bo; Baldetorp, Bo; Marko-Varga, György

    2013-02-27

    The objectives and goals of the Southern Swedish Malignant Melanoma (SSMM) are to develop, build and utilize cutting edge biobanks and OMICS platforms to better understand disease pathology and drug mechanisms. The SSMM research team is a truly cross-functional group with members from oncology, surgery, bioinformatics, proteomics, and genomics initiatives. Within the research team there are members who daily diagnose patients with suspect melanomas, do follow-ups on malignant melanoma patients and remove primary or metastatic lesions by surgery. This inter-disciplinary clinical patient care ensures a competence build as well as a best practice procedure where the patient benefits. Clinical materials from patients before, during and after treatments with clinical end points are being collected. Tissue samples as well as bio-fluid samples such as blood fractions, plasma, serum and whole blood will be archived in 384-high density sample tube formats. Standardized approaches for patient selections, patient sampling, sample-processing and analysis platforms with dedicated protein assays and genomics platforms that will hold value for the research community are used. The patient biobank archives are fully automated with novel ultralow temperature biobank storage units and used as clinical resources. An IT-infrastructure using a laboratory information management system (LIMS) has been established, that is the key interface for the research teams in order to share and explore data generated within the project. The cross-site data repository in Lund forms the basis for sample processing, together with biological samples in southern Sweden, including blood fractions and tumor tissues. Clinical registries are associated with the biobank materials, including pathology reports on disease diagnosis on the malignant melanoma (MM) patients. We provide data on the developments of protein profiling and targeted protein assays on isolated melanoma tumors, as well as reference blood standards that is used by the team members in the respective laboratories. These pilot data show biobank access and feasibility of performing quantitative proteomics in MM biobank repositories collected in southern Sweden. The scientific outcomes further strengthen the build of healthcare benefit in the complex challenges of malignant melanoma pathophysiology that is addressed by the novel personalized medicines entering the market.

  20. Planning, Designing, Building, and Moving a Large Volume Maternity Service to a New Labor and Birth Unit.

    PubMed

    Thompson, Heather; Legorreta, Kimberly; Maher, Mary Ann; Lavin, Melanie M

    Our health system recognized the need to update facility space and associated technology for the labor and birth unit within our large volume perinatal service to improve the patient experience, and enhance safety, quality of care, and staff satisfaction. When an organization decides to invest $30 million dollars in a construction project such as a new labor and birth unit, many factors and considerations are involved. Financial support, planning, design, and construction phases of building a new unit are complex and therefore require strong interdisciplinary collaboration, leadership, and project management. The new labor and birth unit required nearly 3 years of planning, designing, and construction. Patient and family preferences were elicited through consumer focus groups. Multiple meetings with the administrative and nursing leadership teams, staff nurses, nurse midwives, and physicians were held to generate ideas for improvement in the new space. Involving frontline clinicians and childbearing women in the process was critical to success. The labor and birth unit moved to a new patient tower in a space that was doubled in square footage and geographically now on three separate floors. In the 6 months prior to the move, many efforts were made in our community to share our new space. The marketing strategy was very detailed and creative with ongoing input from the nursing leadership team. The nursing staff was involved in every step along the way. It was critical to have champions as workflow teams emerged. We hosted simulation drills and tested scenarios with new workflows. Move day was rehearsed with representatives of all members of the perinatal team participating. These efforts ultimately resulted in a move time of ~5 hours. Birth volumes increased 7% within the first 6 months. After 3 years in our new space, our birth volumes have risen nearly 15% and are still growing. Key processes and roles responsible for a successful build, efficient and safe move day, and optimal operational utility, as anticipated, of a new labor and birth unit in a large volume perinatal service are detailed.

  1. WAVE~Ripples for Change Obesity Two-Year Intervention in High School Soccer Players: Process Evaluation, Best Practices, and Youth Engagement.

    PubMed

    Meng, Yu; Wong, Siew Sun; Manore, Melinda M; Patton-López, Mēgan

    2018-06-01

    This paper reports the process data on program fidelity, best practices for intervention implementation, youth and coach engagement, and youth application of knowledge and skills for the two-year WAVE~Ripples for Change (WAVE) obesity prevention intervention program focused on healthy eating, physical activity, and life skills with high school (HS) soccer players aged 14⁻19 years. Internal (staff: n = 7; volunteers: n = 27) and external (youth: n = 100; coaches: n = 9) stakeholders were interviewed/ surveyed. Staff rated program fidelity as high (94%), as did volunteers (85%). Best practices included coach encouragement for athlete participation, use of on-line consent for enrollment, building relationships with HS staff to complete assessments, sending text reminders, and providing incentives. Study results showed an enrollment rate of 72%, completion of baseline assessments of 89⁻98%, attendance of sports nutrition lessons in Year 1 and Year 2 of 90% and 39%, respectively, and team-building workshop (TBW) attendance of 25⁻31%. Activities exceeding youth expectations (>90%) included, (1) activities with their soccer team; (2) the TBW-cooking; and (3) sports nutrition lessons. The obesity prevention skills most applied by youth were obtained from the TBW-gardening and harvesting (49%), the TBW-cooking (43%), and sports nutrition lessons (44%). Coaches also rated the sports nutrition lessons highly and reported increased awareness for hydration/fueling during sport by the athletes. Using sport teams/clubs to engage youth in obesity prevention is a feasible model for future study.

  2. An investigation of multidisciplinary complex health care interventions - steps towards an integrative treatment model in the rehabilitation of People with Multiple Sclerosis

    PubMed Central

    2012-01-01

    Background The Danish Multiple Sclerosis Society initiated a large-scale bridge building and integrative treatment project to take place from 2004–2010 at a specialized Multiple Sclerosis (MS) hospital. In this project, a team of five conventional health care practitioners and five alternative practitioners was set up to work together in developing and offering individualized treatments to 200 people with MS. The purpose of this paper is to present results from the six year treatment collaboration process regarding the development of an integrative treatment model. Discussion The collaborative work towards an integrative treatment model for people with MS, involved six steps: 1) Working with an initial model 2) Unfolding the different treatment philosophies 3) Discussing the elements of the Intervention-Mechanism-Context-Outcome-scheme (the IMCO-scheme) 4) Phrasing the common assumptions for an integrative MS program theory 5) Developing the integrative MS program theory 6) Building the integrative MS treatment model. The model includes important elements of the different treatment philosophies represented in the team and thereby describes a common understanding of the complexity of the courses of treatment. Summary An integrative team of practitioners has developed an integrative model for combined treatments of People with Multiple Sclerosis. The model unites different treatment philosophies and focuses on process-oriented factors and the strengthening of the patients’ resources and competences on a physical, an emotional and a cognitive level. PMID:22524586

  3. Multidisciplinary safety team (MDST) factors of success.

    DOT National Transportation Integrated Search

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  4. 8 ways to build collaborative teams.

    PubMed

    Gratton, Lynda; Erickson, Tamara J

    2007-11-01

    Executing complex initiatives like acquisitions or an IT overhaul requires a breadth of knowledge that can be provided only by teams that are large, diverse, virtual, and composed of highly educated specialists. The irony is, those same characteristics have an alarming tendency to decrease collaboration on a team. What's a company to do? Gratton, a London Business School professor, and Erickson, president of the Concours Institute, studied 55 large teams and identified those with strong collaboration despite their complexity. Examining the team dynamics and environment at firms ranging from Royal Bank of Scotland to Nokia to Marriott, the authors isolated eight success factors: (1) "Signature" relationship practices that build bonds among the staff, in memorable ways that are particularly suited to a company's business. (2) Role models of collaboration among executives, which help cooperation trickle down to the staff. (3) The establishment of a "gift culture," in which managers support employees by mentoring them daily, instead of a transactional "tit-for-tat culture", (4) Training in relationship skills, such as communication and conflict resolution. (5) A sense of community, which corporate HR can foster by sponsoring group activities. (6) Ambidextrous leadership, or leaders who are both task-oriented and relationship-oriented. (7) Good use of heritage relationships, by populating teams with members who know and trust one another. (8) Role clarity and task ambiguity, achieved by defining individual roles sharply but giving teams latitude on approach. As teams have grown from a standard of 20 members to comprise 100 or more, team practices that once worked well no longer apply. The new complexity of teams requires companies to increase their capacity for collaboration, by making long-term investments that build relationships and trust, and smart near-term decisions about how teams are formed and run.

  5. Enhancing the traditional hospital design process: a focus on patient safety.

    PubMed

    Reiling, John G; Knutzen, Barbara L; Wallen, Thomas K; McCullough, Susan; Miller, Ric; Chernos, Sonja

    2004-03-01

    In 2002 St. Joseph's Community Hospital (West Bend, WI), a member of SynergyHealth, brought together leaders in health care and systems engineering to develop a set of safety-driven facility design principles that would guide the hospital design process. DESIGNING FOR SAFETY: Hospital leadership recognized that a cross-departmental team approach would be needed and formed the 11-member Facility Design Advisory Council, which, with departmental teams and the aid of architects, was responsible for overseeing the design process and for ensuring that the safety considerations were met. The design process was a team approach, with input from national experts, patients and families, hospital staff and physicians, architects, contractors, and the community. The new facility, designed using safety-driven design principles, reflects many innovative design elements, including truly standardized patient rooms, new technology to minimize falls, and patient care alcoves for every patient room. The new hospital has been designed with maximum adaptability and flexibility in mind, to accommodate changes and provide for future growth. The architects labeled the innovative design. The Synergy Model, to describe the process of shaping the entire building and its spaces to work efficiently as a whole for the care and safety of patients. Construction began on the new facility in August 2003 and is expected to be completed in 2005.

  6. Knowledge translation: An interprofessional approach to integrating a pain consult team within an acute care unit.

    PubMed

    Feldman, Kira; Berall, Anna; Karuza, Jurgis; Senderovich, Helen; Perri, Giulia-Anna; Grossman, Daphna

    2016-11-01

    Management of pain in the frail elderly presents many challenges in both assessment and treatment, due to the presence of multiple co-morbidities, polypharmacy, and cognitive impairment. At Baycrest Health Sciences, a geriatric care centre, pain in its acute care unit had been managed through consultations with the pain team on a case-by-case basis. In an intervention informed by knowledge translation (KT), the pain specialists integrated within the social network of the acute care team for 6 months to disseminate their expertise. A survey was administered to staff on the unit before and after the intervention of the pain team to understand staff perceptions of pain management. Pre- and post-comparisons of the survey responses were analysed by using t-tests. This study provided some evidence for the success of this interprofessional education initiative through changes in staff confidence with respect to pain management. It also showed that embedding the pain team into the acute care team supported the KT process as an effective method of interprofessional team building. Incorporating the pain team into the acute care unit to provide training and ongoing decision support was a feasible strategy for KT and could be replicated in other clinical settings.

  7. The academic librarian as co-investigator on an interprofessional primary research team: a case study.

    PubMed

    Janke, Robert; Rush, Kathy L

    2014-06-01

    The objective of this study was to explore the role librarians play on research teams. The experiences of a librarian and a faculty member are situated within the wider literature addressing collaborations between health science librarians and research faculty. A case study approach is used to outline the involvement of a librarian on a team created to investigate the best practices for integrating nurses into the workplace during their first year of practice. Librarians contribute to research teams including expertise in the entire process of knowledge development and dissemination including the ability to navigate issues related to copyright and open access policies of funding agencies. The librarian reviews the various tasks performed as part of the research team ranging from the grant application, to working on the initial literature review as well as the subsequent manuscripts that emerged from the primary research. The motivations for joining the research team, including authorship and relationship building, are also discussed. Recommendations are also made in terms of how librarians could increase their participation on research teams. The study shows that librarians can play a key role on interprofessional primary research teams. © 2014 The authors. Health Information and Libraries Journal © 2014 Health Libraries Group.

  8. Developing Diverse Teams to Improve Performance in the Organizational Setting

    ERIC Educational Resources Information Center

    Yeager, Katherine L.; Nafukho, Fredrick M.

    2012-01-01

    Purpose: The use of teams in organizations given the current trend toward globalization, population changes, and an aging workforce, especially in high-income countries, makes the issue of diverse team building critical. The purpose of this paper is to explore the issue of team diversity and team performance through the examination of theory and…

  9. Exploring Students' Group Work Needs in the Context of Internationalisation Using a Creative Visual Method

    ERIC Educational Resources Information Center

    Cox, Andrew; Chiles, Prue; Care, Leo

    2012-01-01

    While UK universities see group work as essential to building higher order intellectual and team skills, many international students are unfamiliar with this way of studying. Group work is also a focus of home students' concerns. Cultural differences in the interpretation of space for learning or how spatial issues affect group work processes has…

  10. Building a Linked Learning Pathway: A Guide for Transforming High Schools for College and Career Success

    ERIC Educational Resources Information Center

    Atterbury, Rob

    2014-01-01

    This guide provides an overview of a more robust online guide and toolkit available through ConnectEd Studios. It supplies a glimpse of the sequence of steps involved in creating a new Linked Learning pathway. This publication can help coaches, district leadership, and pathway teams gain an understanding of the overall process of designing and…

  11. Learning Environment: An Architectural Interpretation of a New Designs Archetype High School.

    ERIC Educational Resources Information Center

    Jilk, Bruce A.; And Others

    The New Designs for the Comprehensive High School project used the break-the-mold design-down process to develop a prototype high school. The basic building block of this design is the personal workstation, not the classroom. Combining the personal workstation with the desire for teaming leads to the idea of a small, flexible group space that…

  12. Research in Information Processing and Computer Science. Final Technical Report.

    ERIC Educational Resources Information Center

    Carnegie-Mellon Univ., Pittsburgh, PA. Social Studies Curriculum Center.

    This is the final scientific research report for the research in programing at Carnegie-Mellon University during 1968-1970. Three team programing efforts during the past two years have been the development of (1) BLISS--a system building language on the PDP-10 computer, (2) LC2--a conversational system on the IBM/360, and L*--a system building…

  13. The Cognitive Processes Used in Team Collaboration During Asynchronous, Distributed Decision Making

    DTIC Science & Technology

    2004-06-01

    Transfer Conventions (IPtcp) IP: Solution Alternatives (IPsa) KB: Collaborative Knowledge (KBck) KB: Shared Understanding ( KBsu ) KB: Domain...Gill.” KBsu : Knowledge Building (shared understanding) = using facts to justify a solution. “I think Eddie did it because he was hard of hearing...KB: Collaborative Knowledge (KBck) KB: Shared Understanding ( KBsu ) KB: Domain Expertise (IPde) * * ** ** ** = significant Results 15

  14. A Multi-Level Approach to Outreach for Geologic Sequestration Projects

    USGS Publications Warehouse

    Greenberg, S.E.; Leetaru, H.E.; Krapac, I.G.; Hnottavange-Telleen, K.; Finley, R.J.

    2009-01-01

    Public perception of carbon capture and sequestration (CCS) projects represents a potential barrier to commercialization. Outreach to stakeholders at the local, regional, and national level is needed to create familiarity with and potential acceptance of CCS projects. This paper highlights the Midwest Geological Sequestration Consortium (MGSC) multi-level outreach approach which interacts with multiple stakeholders. The MGSC approach focuses on external and internal communication. External communication has resulted in building regional public understanding of CCS. Internal communication, through a project Risk Assessment process, has resulted in enhanced team communication and preparation of team members for outreach roles. ?? 2009 Elsevier Ltd. All rights reserved.

  15. Lessons We Learned Designing and Building the Chandra Telescope

    NASA Technical Reports Server (NTRS)

    Arenberg, Jonathan; Matthews, Gary; Atkinson, C.; Cohen, L.; Golisano, C.; Havey, K.; Hefner, K.; Jones, C.; Kegley, J.; Knollenberg, P.; hide

    2014-01-01

    2014 marks the crystal (15th) anniversary of the launch of the Chandra X-ray Observatory. This paper offers some of the major lessons learned by some of the key members of the Chandra Telescope team. We offer some of the lessons gleaned from our experiences developing, designing, building and testing the telescope and its subsystems, with 15 years of hindsight. Among the topics to be discussed are the early developmental tests, known as VETA-I and VETA-II, requirements derivation, the impact of late requirements and reflection on the conservatism in the design process.

  16. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  17. Technology Solutions for Existing Homes Case Study: Trade-Friendly Retrofit Insulated Panels for Existing Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    For this project with the U.S. Department of Energy Building America team Home Innovation Research Labs, the retrofit insulated panels relied on an enhanced expanded polystyrene (EPS) for thermal resistance of R-4.5/inch, which is an improvement of 10% over conventional (white-colored) EPS. EPS, measured by its life cycle, is an alternative to commonly used extruded polystyrene and spray polyurethane foam. It is a closed-cell product made up of 90% air, and it requires about 85% fewer petroleum products for processing than other rigid foams.

  18. Team Building through Physical Challenges in Gender-Segregated Classes and Student Self-Conceptions

    ERIC Educational Resources Information Center

    Gibbons, Sandra L.; Ebbeck, Vicki

    2011-01-01

    It was of interest to determine if earlier research findings, where female students were particularly advantaged by the Team Building Through Physical Challenges (TBPC; Glover & Midura, 1992) program in a coeducational setting, would still be observed in gender-segregated physical education classes. A total of 260 female (n = 127) and male (n…

  19. Technological Supports for Onsite and Distance Education and Students' Perceptions of Acquisition of Thinking and Team-Building Skills

    ERIC Educational Resources Information Center

    Thomas, Jennifer D. E.; Morin, Danielle

    2010-01-01

    This paper compares students' perceptions of support provided in the acquisition of various thinking and team-building skills, resulting from the various activities, resources and technologies (ART) integrated into an upper level Distributed Computing (DC) course. The findings indicate that students perceived strong support for their acquisition…

  20. Expedition 43 flight control team with Flight Director Gary Horlacher during the release of SpaceX Dragon cargo vehicle. Photo Date: May 21, 2015. Location: Building 30 - FCR1. Photographer: Robert Markowitz

    NASA Image and Video Library

    2015-05-21

    Expedition 43 flight control team with Flight Director Gary Horlacher during the release of SpaceX Dragon cargo vehicle. Photo Date: May 21, 2015. Location: Building 30 - FCR1. Photographer: Robert Markowitz

  1. 78 FR 20331 - Changes in Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes............ 350070 (12-06-1488P). David Coss, Avenue, Santa Fe, team.com/lomrs.htm. Mayor, City of NM 87501. Santa Fe... Design http://www.rampp- May 28, 2013......... 405381 06-1019P). Dewey F. Office, 2317 team.com/lomrs.htm...

  2. Achieving a Balance: Proceedings of the National Conference on Adapted Physical Activity (5th, Macomb, Illinois, April 3-5, 1997).

    ERIC Educational Resources Information Center

    Western Illinois Univ., Macomb. Coll. of Education and Human Services.

    This proceedings include the following papers: "Developing a District Building Based Team" (Kathy Heller and Michelle Till); "Wheelchair Rhythmic Sportive Gymnastics" (Gertrude Krombholz and Atja Gotzova-Kumpf); "Team Building in Inclusion Settings" (Robert Weber); "Inclusion: Identifying Student Needs" (Jeff Runge); "Overview of the Role of…

  3. Measuring and improving quality of care in an academic medical center.

    PubMed

    Blayney, Douglas W

    2013-05-01

    The Donabedian definition of quality—structure, process, and outcome—provides a useful framework. A relentless focus on measuring process adherence and outcome is critical. Systemic improvements usually require teams to plan and to implement them. The lean or Toyota production system for process improvement is one useful method of organizing work, although different approaches are often necessary at the physician, practice unit, and statewide level. Challenges include scalability of the change (ie, rolling them out across the institution or system), tailoring the information technology tools, and building systems for sustainability.

  4. Building Virtual Teams: Experiential Learning Using Emerging Technologies

    ERIC Educational Resources Information Center

    Hu, Haihong

    2015-01-01

    Currently, virtual teams are being used exponentially in higher education and business because of the development of technologies and globalization. These teams have become an essential approach for collaborative learning as well as task completion. Team learning, especially in an online format, can be challenging due to lack of effective…

  5. Team Building Patterns of Academic Groups.

    ERIC Educational Resources Information Center

    Kormanski, Chuck

    1990-01-01

    Used group development stage theory to investigate team development patterns in an academic setting. Twenty-nine teams of undergraduate college students enrolled in a study skills improvement course met weekly for five weeks and completed the Team Development Rating Scale at the conclusion of the meeting. Found some support for three patterns of…

  6. Listening and Legos[TM

    ERIC Educational Resources Information Center

    Morris, Pamela

    2012-01-01

    This simple exercise, performed in teams, gives students practice in listening to instructions, particularly when there are restrictions for the communication. The teams compete in a limited amount of time to build a Lego[TM] structure based on the instructions of one team member. Which team listens the best and is most successful?

  7. 77 FR 65535 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ... Islands (BSAI) Groundfish Plan Teams will meet in Seattle, WA. DATES: The meetings will be held November... NE., Building 4, Observer Training Room 1055 (GOA Plan Team) and Traynor Room 2076 (BS/AI Plan Team... Fishery Management Council; telephone: (907) 271-2809. SUPPLEMENTARY INFORMATION: The Plan Teams will...

  8. Developing Expert Teams with a Strong Safety Culture

    NASA Technical Reports Server (NTRS)

    Rogers, David G.

    2010-01-01

    Would you like to lead a world renowned team that draws out all the talents and expertise of its members and consistently out performs all others in the industry? Ever wonder why so many organizations fail to truly learn from past mistakes only to repeat the same ones at a later date? Are you a program/project manager or team member in a high-risk organization where the decisions made often carry the highest of consequences? Leadership, communication, team building, critical decision-making and continuous team improvement skills and behaviors are mere talking points without the attitudes, commitment and strategies necessary to make them the very fabric of a team. Developing Expert Teams with a Strong Safety Culture, will provide you with proven knowledge and strategies to take your team soaring to heights you may have not thought possible. A myriad of teams have applied these strategies and techniques within their organization team environments: military and commercial aviation, astronaut flight crews, Shuttle flight controllers, members of the Space Shuttle Program Mission Management Team, air traffic controllers, nuclear power control teams, surgical teams, and the fire service report having spectacular success. Many industry leaders are beginning to realize that although the circumstances and environments of these teams may differ greatly to their own, the core elements, governing principles and dynamics involved in managing and building a stellar safety conscious team remain identical.

  9. Implementation of a Campuswide Distributed Mass Storage Service: the Dream Versus Reality

    NASA Technical Reports Server (NTRS)

    Prahst, Stephen; Armstead, Betty Jo

    1996-01-01

    In 1990, a technical team at NASA Lewis Research Center, Cleveland, Ohio, began defining a Mass Storage Service to pro- wide long-term archival storage, short-term storage for very large files, distributed Network File System access, and backup services for critical data dw resides on workstations and personal computers. Because of software availability and budgets, the total service was phased in over dm years. During the process of building the service from the commercial technologies available, our Mass Storage Team refined the original vision and learned from the problems and mistakes that occurred. We also enhanced some technologies to better meet the needs of users and system administrators. This report describes our team's journey from dream to reality, outlines some of the problem areas that still exist, and suggests some solutions.

  10. KSC-06pd0469

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, members of the "Pink Team" prepare their robot, Roccobot. The Pink Team comprises students from Rockledge High and Cocoa Beach High Schools and is co-sponsored by NASA KSC. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  11. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  12. Share and Succeed: The Development of Knowledge Sharing and Brokerage in Data Teams' Network Structures

    ERIC Educational Resources Information Center

    Hubers, Mireille D.; Moolenaar, Nienke M.; Schildkamp, Kim; Daly, Alan J.; Handelzalts, Adam; Pieters, Jules M.

    2018-01-01

    The data team intervention was designed to support Dutch secondary schools in using data while developing a solution to an educational problem. A data team can build school-wide capacity for data use through knowledge sharing among data team members, and knowledge brokerage between the team and other colleagues. The goal of this mixed-methods…

  13. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  14. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  15. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  16. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  17. The Art of Coaching Teams: Building Resilient Communities That Transform Schools

    ERIC Educational Resources Information Center

    Aguilar, Elena

    2016-01-01

    "The Art of Coaching Teams" is the manual you never received when you signed on to lead a team. Being a great teacher is one thing, but leading a team, or team development, is an entirely different dynamic. Your successes are public, but so are your failures--and there is no specific rubric or curriculum to give you direction. Team…

  18. Building an Undergraduate STEM Team Using Team-Based Learning Leading to the Production of a Storyboard Appropriate for Elementary Students

    NASA Astrophysics Data System (ADS)

    Cutright, Teresa J.; Evans, Edward; Brantner, Justin S.

    2014-06-01

    A unique undergraduate team that spans five different engineering disciplines, chemistry, biology, and mathematics was formed. The team was formed to promote cross-disciplinary learning, to improve retention, and to prepare the students for the kind of problems they will face in their careers. This paper describes the variety of activities used over 2 years to tie the team together, as well as afford opportunities to develop team-building skills. The activities described highlight the critical elements of a faculty leader whose own work is interdisciplinary, correct balance of disciplines in the team, and sufficient time for team development. The use of external feedback was essential for all activities. Clearly defined goals and hard deadlines were critical for the completion of individual activities, as well as developing a healthy team environment. Although the student cohort has learned from the activities, more time is needed to assess whether the students have become a fully efficient team. Furthermore, an additional cohort would be needed to assess whether the approach was able to assist with student's interest in STEM and their desire to help other people.

  19. ADVANCED MANUFACTURING TEAM

    NASA Image and Video Library

    2016-03-17

    KEN COOPER, TEAM LEAD OF MSFC’S ADVANCED MANUFACTURING TEAM, WITH NICKEL ALLOY 718 PARTS FABRICATED USING THE M1 SELECTIVE LASER MELTING SYSTEM. THE M1 MACHINE IS DEDICATED TO BUILDING QUALIFICATION SAMPLES AND HARDWARE DEMONSTRATORS FOR THE RS25 ENGINE PROJECT.

  20. 75 FR 53951 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ...) Groundfish Plan Teams will meet in Seattle, WA. DATES: The meetings will be held September 20-23, 2010. The...., Building 4, Observer Training Room (GOA Plan Team) and Traynor Room (BS/AI Plan Team), Seattle, WA. Council...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosenberg, Michael; Jonlin, Duane; Nadel, Steven

    Today’s building energy codes focus on prescriptive requirements for features of buildings that are directly controlled by the design and construction teams and verifiable by municipal inspectors. Although these code requirements have had a significant impact, they fail to influence a large slice of the building energy use pie – including not only miscellaneous plug loads, cooking equipment and commercial/industrial processes, but the maintenance and optimization of the code-mandated systems as well. Currently, code compliance is verified only through the end of construction, and there are no limits or consequences for the actual energy use in an occupied building. Inmore » the future, our suite of energy regulations will likely expand to include building efficiency, energy use or carbon emission budgets over their full life cycle. Intelligent building systems, extensive renewable energy, and a transition from fossil fuel to electric heating systems will likely be required to meet ultra-low-energy targets. This paper lays out the authors’ perspectives on how buildings may evolve over the course of the 21st century and the roles that codes and regulations will play in shaping those buildings of the future.« less

  2. [Team work and interdiciplinarity: challenges facing the implementation of comprehensive outpatient care for people with HIV/Aids in Pernambuco].

    PubMed

    Borges, Maria Jucineide Lopes; Sampaio, Aletheia Soares; Gurgel, Idê Gomes Dantas

    2012-01-01

    The complexity of providing healthcare to people with HIV/Aids requires investment in comprehensive action and care, constituting a challenge for the multidisciplinary work teams to build an interdisciplinary practice. This study sought to analyze comprehensive healthcare in the Specialized Assistance Services for HIV/Aids (SAE-HIV/Aids) in Recife, in the State of Pernambuco, starting with the process and organization of team work. This is a case study developed in three SAE-HIV/Aids units, based on a qualitative approach using different research techniques. The results show that SAE-HIV/Aids have complied with most of the Brazilian Health Ministry recommendations in terms of basic infrastructure, though none of them had a team of appropriate size. These services have shown signs of fragmentation and difficulty in establishing a systematic intersectorial and interdisciplinary practice, with failings in ensuring the reference and counter-reference flow. It was seen that there was little appreciation of the role of the manager as team leader. The need to perceive the user as a whole was identified, as well as for the team to work in a coordinated manner in order to ensure communicative and relational activities.

  3. 324 Building B-Cell Pressurized Water Reactor Spent Fuel Packaging & Shipment RL Readiness Assessment Final Report [SEC 1 Thru 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HUMPHREYS, D C

    A parallel readiness assessment (RA) was conducted by independent Fluor Hanford (FH) and U. S. Department of Energy, Richland Operations Office (RL) team to verify that an adequate state of readiness had been achieved for activities associated with the packaging and shipping of pressurized water reactor fuel assemblies from B-Cell in the 324 Building to the interim storage area at the Canister Storage Building in the 200 Area. The RL review was conducted in parallel with the FH review in accordance with the Joint RL/FH Implementation Plan (Appendix B). The RL RA Team members were assigned a FH RA Teammore » counterpart for the review. With this one-on-one approach, the RL RA Team was able to assess the FH Team's performance, competence, and adherence to the implementation plan and evaluate the level of facility readiness. The RL RA Team agrees with the FH determination that startup of the 324 Building B-Cell pressurized water reactor spent nuclear fuel packaging and shipping operations can safely proceed, pending completion of the identified pre-start items in the FH final report (see Appendix A), completion of the manageable list of open items included in the facility's declaration of readiness, and execution of the startup plan to operations.« less

  4. Rich Township High School, Olympia Fields Campus, Rich Township, Illinois. Profiles of Significant Schools.

    ERIC Educational Resources Information Center

    Clinchy, Evans

    A profile is presented of a high school designed to accommodate the organization of teachers into teams working with student groups of varying sizes--this organization is housed in a compact building with the teaching teams centered in clusters of classrooms. The building is heated in winter and cooled in summer by a heat pump system. The…

  5. Utilizing Response to Intervention (RtI) as a Means of Studying Capacity Building and Motivation of Staff by School Leadership Teams

    ERIC Educational Resources Information Center

    Mahoney, Brian J.

    2013-01-01

    This research study explored the concept of capacity building and motivation of staff by school leadership teams in the successful development and implementation of educational initiatives, specifically Response to Intervention (RtI). A great deal of scholarship has addressed leadership and its effect on motivation, but few studies have…

  6. Solar Decathlon 2015 - Indigo Pine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blouin, Vincent

    The Solar Decathlon competition challenges students across the country to design and build a net-zero, market ready solar powered home. The bi-annual competition consists of ten contests that seek to balance the home on a scale of innovation. The ten contests were selected by to organizers to address all aspects of housing, including architecture, market appeal, engineering, communication, affordability, comfort, appliances, home life, commuting, and energy balance. Along with the criteria associated with the contests, the competition includes several design constraints that mirror those found in practical housing applications: including (but certainly not limited to) lot lines, building height, andmore » ADA accessibility. The Solar Decathlon 2015 was held at the Orange Country Great Park in Irvine, CA. The 2015 competition was Clemson University’s first entry into the Solar Decathlon and was a notable milestone in the continued development of a home, called Indigo Pine. From the beginning, the team reconsidered the notion of sustainability as related to both the design of a home and the competition itself. The designing and building process for the home reflects a process which seamlessly moves between thinking and making to develop a comprehensive design with a method and innovations that challenge the conventions of residential construction. This report is a summary of the activities of the Clemson University team during the two-year duration of the project leading to the participation in the 2015 Solar Decathlon competition in Irvine California.« less

  7. Communication Skills to Develop Trusting Relationships on Global Virtual Engineering Capstone Teams

    ERIC Educational Resources Information Center

    Zaugg, Holt; Davies, Randall S.

    2013-01-01

    As universities seek to provide cost-effective, cross-cultural experiences using global virtual (GV) teams, the "soft" communication skills typical of all teams, increases in importance for GV teams. Students need to be taught how to navigate through cultural issues and virtual tool issues to build strong trusting relationships with…

  8. 75 FR 66071 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... Way NE., Building 4, Observer Training Room (GOA Plan Team) and Traynor Room (BS/AI Plan Team.../Aleutian Islands (BS/AI) Groundfish plan teams will meet in Seattle, WA. DATES: The meetings will be held...: (907) 271-2809. SUPPLEMENTARY INFORMATION: The plan teams will prepare and review the stock [[Page...

  9. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  10. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  11. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  12. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  13. 76 FR 66274 - North Pacific Fishery Management Council (NPFMC); Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... Sea/Aleutian Islands (BS/AI) Groundfish Plan Teams will meet in Seattle. DATES: November 14-18, 2011...., Building 4, Observer Training Room (GOA Plan Team) and Traynor Room (BS/AI Plan Team), Seattle, WA. Council.... SUPPLEMENTARY INFORMATION: The Plan Teams will compile and review the annual Groundfish Stock Assessment and...

  14. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  15. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  16. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  17. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  18. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  19. KSC-06pd0458

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - Members of the "Pink Team" explain their robot to Florida Governor Jeb Bush at the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando. The Pink Team, whose robot is named Roccobot, is co-sponsored by NASA KSC. At least four teams in the competition were sponsored by KSC, NASA and contractors. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  20. Future Time Perspective in Occupational Teams: Do Older Workers Prefer More Familiar Teams?

    PubMed Central

    Gärtner, Laura U. A.; Hertel, Guido

    2017-01-01

    Working in teams is quite popular across different industries and cultures. While some of these teams exist for longer time periods, other teams collaborate only for short periods and members switch into new teams after goals are accomplished. However, workers’ preferences for joining a new team might vary in different ways. Based on Carstensen’s socioemotional selectivity theory, we predict that emotionally meaningful teams are prioritized when occupational future time perspective (OFTP) is perceived as limited. Building and expanding on studies outside of the work context, we expected that older as compared to younger workers prefer more familiar teams, and that this effect is mediated by workers’ OFTP. Moreover, we assumed that experimentally manipulated OFTP can change such team preferences. The hypotheses were tested in an online scenario study using three experimental conditions (within-person design). Four hundred and fifty-four workers (57% female, age M = 45.98, SD = 11.46) were asked to choose between a familiar and a new team in three consecutive trials: under an unspecified OFTP (baseline), under an expanded OFTP (amendment of retirement age), and under a restricted OFTP (insolvency of the current company). Whereas the baseline condition was always first, the order of the second and third conditions was randomized among participants. In the baseline condition, results showed the expected mediation effect of workers’ OFTP on the relation between workers’ age and preference for a familiar over a new team. Higher age was associated with more limited OFTP, which in turn was associated with higher preference for a familiar over a new team. Moreover, experimentally restricting OFTP increased preference for a familiar team over a new team regardless of workers’ age, providing further evidence for the assumed causal processes and showing interesting avenues for practical interventions in occupational teams. PMID:29018376

  1. Future Time Perspective in Occupational Teams: Do Older Workers Prefer More Familiar Teams?

    PubMed

    Gärtner, Laura U A; Hertel, Guido

    2017-01-01

    Working in teams is quite popular across different industries and cultures. While some of these teams exist for longer time periods, other teams collaborate only for short periods and members switch into new teams after goals are accomplished. However, workers' preferences for joining a new team might vary in different ways. Based on Carstensen's socioemotional selectivity theory, we predict that emotionally meaningful teams are prioritized when occupational future time perspective (OFTP) is perceived as limited. Building and expanding on studies outside of the work context, we expected that older as compared to younger workers prefer more familiar teams, and that this effect is mediated by workers' OFTP. Moreover, we assumed that experimentally manipulated OFTP can change such team preferences. The hypotheses were tested in an online scenario study using three experimental conditions (within-person design). Four hundred and fifty-four workers (57% female, age M = 45.98, SD = 11.46) were asked to choose between a familiar and a new team in three consecutive trials: under an unspecified OFTP (baseline), under an expanded OFTP (amendment of retirement age), and under a restricted OFTP (insolvency of the current company). Whereas the baseline condition was always first, the order of the second and third conditions was randomized among participants. In the baseline condition, results showed the expected mediation effect of workers' OFTP on the relation between workers' age and preference for a familiar over a new team. Higher age was associated with more limited OFTP, which in turn was associated with higher preference for a familiar over a new team. Moreover, experimentally restricting OFTP increased preference for a familiar team over a new team regardless of workers' age, providing further evidence for the assumed causal processes and showing interesting avenues for practical interventions in occupational teams.

  2. Managers and the new definition of quality.

    PubMed

    Chilgren, Allison A

    2008-01-01

    The manager, particularly the mid-level manager, has a vital role in the success of any healthcare organization, especially in the realm of patient perception of quality. To patients, "quality" means how well a service was delivered, not how technically superior the actual service or clinical component turned out. This definition of quality can also be referred to as patient satisfaction. Managers, with help of an integrative team, can develop quality processes geared toward patient expectations by doing a number of things, including the following: clearly identify outcomes, and empower employees to achieve those goals; form an integrated quality development team to establish quality metrics; build in cultural competence into quality processes; and align the organization's mission to the overall quality program. With a successful quality program, managers can expect a considerable return on investment, satisfied patients and staff, and improved clinical outcomes.

  3. The 10 Building Blocks of High-Performing Primary Care

    PubMed Central

    Bodenheimer, Thomas; Ghorob, Amireh; Willard-Grace, Rachel; Grumbach, Kevin

    2014-01-01

    Our experiences studying exemplar primary care practices, and our work assisting other practices to become more patient centered, led to a formulation of the essential elements of primary care, which we call the 10 building blocks of high-performing primary care. The building blocks include 4 foundational elements—engaged leadership, data-driven improvement, empanelment, and team-based care—that assist the implementation of the other 6 building blocks—patient-team partnership, population management, continuity of care, prompt access to care, comprehensiveness and care coordination, and a template of the future. The building blocks, which represent a synthesis of the innovative thinking that is transforming primary care in the United States, are both a description of existing high-performing practices and a model for improvement. PMID:24615313

  4. The 10 building blocks of high-performing primary care.

    PubMed

    Bodenheimer, Thomas; Ghorob, Amireh; Willard-Grace, Rachel; Grumbach, Kevin

    2014-01-01

    Our experiences studying exemplar primary care practices, and our work assisting other practices to become more patient centered, led to a formulation of the essential elements of primary care, which we call the 10 building blocks of high-performing primary care. The building blocks include 4 foundational elements-engaged leadership, data-driven improvement, empanelment, and team-based care-that assist the implementation of the other 6 building blocks-patient-team partnership, population management, continuity of care, prompt access to care, comprehensiveness and care coordination, and a template of the future. The building blocks, which represent a synthesis of the innovative thinking that is transforming primary care in the United States, are both a description of existing high-performing practices and a model for improvement.

  5. From 'what' to 'how' -- capacity building in health promotion for HIV/AIDS prevention in the Solomon Islands.

    PubMed

    McPhail-Bell, Karen; MacLaren, David; Isihanua, Angela; MacLaren, Michelle

    2007-09-01

    This paper describes a capacity building process undertaken within the HIV/AIDS prevention project of the Adventist Development and Relief Agency (ADRA) in the Solomon Islands. ADRA HIV/AIDS has recently reoriented its project structure, moving beyond its awareness raising approach to incorporate health promotion frameworks, theories, strategies and assumptions. These have been used to inform project practice in project planning, delivery and evaluation. This paper shares what has worked and not worked in the capacity building process, including a project evaluation of the initial HIV/AIDS awareness raising project and the application of a number of capacity building strategies, including utilising a volunteer Australian Youth Ambassador for Development (AYAD) funded by the Australian Agency for International Development (AusAID). Existing and new projects are outlined. The underlying theme is that any capacity building exercise must include structural support (e.g. management, national frameworks) to ensure the incorporation of new initiatives and approaches. With time this enables ownership by counterparts and external partnerships to develop. The presence of an AYAD volunteer has been an effective strategy to achieve this. Reflections from the evaluators, the AYAD volunteer and the HIV/AIDS team are included.

  6. A Drupal-Based Collaborative Framework for Science Workflows

    NASA Astrophysics Data System (ADS)

    Pinheiro da Silva, P.; Gandara, A.

    2010-12-01

    Cyber-infrastructure is built from utilizing technical infrastructure to support organizational practices and social norms to provide support for scientific teams working together or dependent on each other to conduct scientific research. Such cyber-infrastructure enables the sharing of information and data so that scientists can leverage knowledge and expertise through automation. Scientific workflow systems have been used to build automated scientific systems used by scientists to conduct scientific research and, as a result, create artifacts in support of scientific discoveries. These complex systems are often developed by teams of scientists who are located in different places, e.g., scientists working in distinct buildings, and sometimes in different time zones, e.g., scientist working in distinct national laboratories. The sharing of these specifications is currently supported by the use of version control systems such as CVS or Subversion. Discussions about the design, improvement, and testing of these specifications, however, often happen elsewhere, e.g., through the exchange of email messages and IM chatting. Carrying on a discussion about these specifications is challenging because comments and specifications are not necessarily connected. For instance, the person reading a comment about a given workflow specification may not be able to see the workflow and even if the person can see the workflow, the person may not specifically know to which part of the workflow a given comments applies to. In this paper, we discuss the design, implementation and use of CI-Server, a Drupal-based infrastructure, to support the collaboration of both local and distributed teams of scientists using scientific workflows. CI-Server has three primary goals: to enable information sharing by providing tools that scientists can use within their scientific research to process data, publish and share artifacts; to build community by providing tools that support discussions between scientists about artifacts used or created through scientific processes; and to leverage the knowledge collected within the artifacts and scientific collaborations to support scientific discoveries.

  7. Project Report: Automatic Sequence Processor Software Analysis

    NASA Technical Reports Server (NTRS)

    Benjamin, Brandon

    2011-01-01

    The Mission Planning and Sequencing (MPS) element of Multi-Mission Ground System and Services (MGSS) provides space missions with multi-purpose software to plan spacecraft activities, sequence spacecraft commands, and then integrate these products and execute them on spacecraft. Jet Propulsion Laboratory (JPL) is currently is flying many missions. The processes for building, integrating, and testing the multi-mission uplink software need to be improved to meet the needs of the missions and the operations teams that command the spacecraft. The Multi-Mission Sequencing Team is responsible for collecting and processing the observations, experiments and engineering activities that are to be performed on a selected spacecraft. The collection of these activities is called a sequence and ultimately a sequence becomes a sequence of spacecraft commands. The operations teams check the sequence to make sure that no constraints are violated. The workflow process involves sending a program start command, which activates the Automatic Sequence Processor (ASP). The ASP is currently a file-based system that is comprised of scripts written in perl, c-shell and awk. Once this start process is complete, the system checks for errors and aborts if there are any; otherwise the system converts the commands to binary, and then sends the resultant information to be radiated to the spacecraft.

  8. Technology Solutions for Existing Homes Overview: Quantifying the Financial Benefits of Multifamily Retrofits

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-04-01

    In this project, the U.S. Department of Energy Building America team Partnership for Advanced Residential Retrofit (PARR) worked with Elevate Energy on three tasks: to conduct pre- and post-retrofit analysis on the income and expense data of 13 Chicago-area multifamily buildings, to compare Chicago income and expense data to two national samples, and to explore the ramifications that energy-efficiency retrofits have on nine Chicago-area neighborhoods. The project team collected building, energy, and income and expense data from multiple private and public sources.

  9. A Community-Academic Partnered Grant Writing Series to Build Infrastructure for Partnered Research.

    PubMed

    King, Keyonna M; Pardo, Yvette-Janine; Norris, Keith C; Diaz-Romero, Maria; Morris, D'Ann; Vassar, Stefanie D; Brown, Arleen F

    2015-10-01

    Grant writing is an essential skill necessary to secure financial support for community programs and research projects. Increasingly, funding opportunities for translational biomedical research require studies to engage community partners, patients, or other stakeholders in the research process to address their concerns. However, there is little evidence on strategies to prepare teams of academic and community partners to collaborate on grants. This paper presents the description and formative evaluation of a two-part community-academic partnered grant writing series designed to help community organizations and academic institutions build infrastructure for collaborative research projects using a partnered approach. The first phase of the series was a half-day workshop on grant readiness, which was open to all interested community partners. The second phase, open only to community-academic teams that met eligibility criteria, was a 12-week session that covered partnered grant writing for foundation grants and National Institutes of Health grants. Participants in both phases reported an increase in knowledge and self-efficacy for writing partnered proposals. At 1-year follow-up, participants in Phase 2 had secured approximately $1.87 million in funding. This community-academic partnered grant writing series helped participants obtain proposal development skills and helped community-academic teams successfully compete for funding. © 2015 Wiley Periodicals, Inc.

  10. A Community–Academic Partnered Grant Writing Series to Build Infrastructure for Partnered Research

    PubMed Central

    Pardo, Yvette‐Janine; Norris, Keith C.; Diaz‐Romero, Maria; Morris, D'Ann; Vassar, Stefanie D.; Brown, Arleen F.

    2015-01-01

    Abstract Grant writing is an essential skill necessary to secure financial support for community programs and research projects. Increasingly, funding opportunities for translational biomedical research require studies to engage community partners, patients, or other stakeholders in the research process to address their concerns. However, there is little evidence on strategies to prepare teams of academic and community partners to collaborate on grants. This paper presents the description and formative evaluation of a two‐part community–academic partnered grant writing series designed to help community organizations and academic institutions build infrastructure for collaborative research projects using a partnered approach. The first phase of the series was a half‐day workshop on grant readiness, which was open to all interested community partners. The second phase, open only to community–academic teams that met eligibility criteria, was a 12‐week session that covered partnered grant writing for foundation grants and National Institutes of Health grants. Participants in both phases reported an increase in knowledge and self‐efficacy for writing partnered proposals. At 1‐year follow‐up, participants in Phase 2 had secured approximately $1.87 million in funding. This community–academic partnered grant writing series helped participants obtain proposal development skills and helped community–academic teams successfully compete for funding. PMID:26365589

  11. Materials and Process Activities for NASA's Composite Crew Module

    NASA Technical Reports Server (NTRS)

    Polis, Daniel L.

    2012-01-01

    In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.

  12. KSC-2014-2293

    NASA Image and Video Library

    2014-04-24

    CAPE CANAVERAL, Fla. – Modifications continue on the Multi-Payload Processing Facility, or MPPF, at NASA's Kennedy Space Center in Florida. Inside the high bay, Skip Williams, Ground Systems Development and Operations, or GSDO, deputy project manager for the spacecraft offline element integration team, points out artist illustrations of how the MPPF's interior and exterior will look after modifications and upgrades have been completed. Kennedy's Center Operations Directorate is overseeing upgrades to the MPPF for GSDO Program. The extensive upgrades and modernizations will support processing of Orion spacecraft for NASA's exploration missions. The 19,647-square-foot building, originally constructed in 1995, primarily will be used for Orion hypergolic fueling, ammonia servicing and high-pressure gas servicing and checkout before being transported to the Vehicle Assembly Building for integration with the Space Launch System. Photo credit: NASA/Daniel Casper

  13. Building effective critical care teams

    PubMed Central

    2011-01-01

    Critical care is formulated and delivered by a team. Accordingly, behavioral scientific principles relevant to teams, namely psychological safety, transactive memory and leadership, apply to critical care teams. Two experts in behavioral sciences review the impact of psychological safety, transactive memory and leadership on medical team outcomes. A clinician then applies those principles to two routine critical care paradigms: daily rounds and resuscitations. Since critical care is a team endeavor, methods to maximize teamwork should be learned and mastered by critical care team members, and especially leaders. PMID:21884639

  14. KSC-06pd0467

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Kennedy Space Center Director Jim Kennedy and his intern Neil Berger talk with students on the Cocoa Beach High School-Rockledge High School robotic team known as the "Pink Team," which was co-sponsored by NASA KSC. The team's robot, at right, is called Roccobot. At least four teams in the competition were sponsored by KSC, NASA and contractors. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  15. SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE FIRE TEAM FACILITY (BUILDING 3001) (CENTER). VIEW TO SOUTHEAST. - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY

  16. Hurricane risk mitigation - Emergency Operations Center

    NASA Image and Video Library

    2008-07-29

    Construction work on a new Emergency Operations Center at Stennis Space Center is nearing completion. Construction is expected to be complete by February 2009, with actual occupancy of the building planned for later that year. The new building will house fire, medical and security teams and will provide a top-grade facility to support storm emergency responder teams and emergency management operations for the south Mississippi facility.

  17. Employee Involvement: The Competitive Edge. Transactions of the IAQC Annual Conference and Resource Mart (9th, New Orleans, Louisiana, April 6-9, 1987).

    ERIC Educational Resources Information Center

    Association for Quality and Participation, Cincinnati, OH.

    Among the 96 papers presented at this conference are the following: "Team Building Techniques that Get Results" (Berg); "The Subtleties of Communication in Small Group Meetings" (Henry); "Feedback--Its Role in Team Building" (Lucas); "Group Dynamics--Success through Interaction" (Manning, Johnson); "The Able-Bodied Handicapped: Bridging the Gap"…

  18. SAAPM 2016 - Eliminate Sexual Assault: Know Your Part, Do Your Part |

    Science.gov Websites

    part of a team of professionals at a command that builds that command climate. Part of that is to not part of a team of professionals at a command that builds that command climate. Part of that is to not the influence of alcohol, so it's important to understand this approach and then be part of the

  19. Research Capacity Building: A Historically Black College/University-Based Case Study of a Peer-to-Peer Mentor Research Team Model

    ERIC Educational Resources Information Center

    Moore, Corey L.; Manyibe, Edward O.; Aref, Fariborz; Washington, Andre L.

    2017-01-01

    Purpose: To evaluate a peer-to-peer mentor research team model (PPMRTM) in building investigators' research skills (i.e., research methods and grant writing) at a historically Black college/university (HBCU) in the United States. Method: Three different theories (i.e., planned change, critical mass, and self-efficacy), contemporary study findings,…

  20. Centrality and Charisma: Comparing How Leader Networks "and" Attributions Affect Team Performance

    ERIC Educational Resources Information Center

    Balkundi, Prasad; Kilduff, Martin; Harrison, David A.

    2011-01-01

    When leaders interact in teams with their subordinates, they build social capital that can have positive effects on team performance. Does this social capital affect team performance because subordinates come to see the leader as charismatic? We answered this question by examining 2 models. First, we tested the charisma-to-centrality model…

  1. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    NASA Astrophysics Data System (ADS)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.

  2. Effective Tools for Conflict Resolution in Multicultural Teams in Industrial Enterprises

    NASA Astrophysics Data System (ADS)

    Videnová, Veronika; Beluský, Martin; Cagáňová, Dagmar; Čambál, Miloš

    2012-12-01

    The aim of this paper is to highlight the issue of resolving conflicts within multicultural teams in industrial enterprises. The authors build upon the concept of multiculturalism which seeks for possible ways to enable different cultures to coexist and the means of communication between them. In the introduction, the authors explain the importance of increased attention and interest in the area of multiculturalism. Industrial enterprises nowadays are increasingly aware of this issue as they become more open to different cultures and they are confronted with intensive international migration and previously isolated societies become more pluralistic. As a result of these processes, individuals are more frequently in contact with members of different cultures.

  3. Play and learn team building.

    PubMed

    Haas, R C; Martin, S

    1997-05-01

    In order to have a team function correctly, power must be distributed equally, with no team member having more perceived power than any other. It is this leveling of the playing field that allows the team to develop and to stimulate the creative juices of its members. This article discusses techniques that can help an organization break down the power barriers and permit its employees to become a cohesive unit--a team.

  4. KSC-06pd0471

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - Members of the "Pink Team" cheer on their robot, Roccobot, during matches at the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando. The Pink Team comprises students from Rockledge High and Cocoa Beach High Schools and is co-sponsored by NASA KSC. The team received the Regional Chairman's Award, described as going to the team judged to have created the best partnership effort among team participants and to have best exemplified the true meaning of FIRST. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  5. KSC-06pd0461

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, the "Pink Team," whose robot is named Roccobot and is co-sponsored by NASA KSC, stands for recognition. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  6. KSC-07pd0621

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- During the FIRST robotics event held at the University of Central Florida Arena March 8-10, Center Director Bill Parsons talks to the NASA-sponsored team, known as the Pink Team, from Rockledge, Cocoa Beach and Viera High Schools in Central Florida. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  7. KSC-07pd0611

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- A Kissimmee, Fla., team (right) prepares its robot for competition with a New Jersey team (center) during the FIRST robotics event held at the University of Central Florida Arena March 8-10. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  8. Visit, revamp, and revitalize your business plan: Part 2.

    PubMed

    Waldron, David

    2011-01-01

    The diagnostic imaging department strives for the highest quality outcomes in imaging quality, in diagnostic reporting, and in providing a caring patient experience while also satisfying the needs of referring physicians. Understand how tools such as process mapping and concepts such as Six Sigma and Lean Six Sigma can be used to facilitate quality improvements and team building, resulting in staff led process improvement initiatives. Discover how to integrate a continuous staff management cycle to implement process improvements,capture the promised performance improvements, and achieve a culture change away from the "way it has always been done".

  9. KSC-07pd0616

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- The audience anxiously awaits a referee's decision during competition of student teams in the FIRST robotics event held at the University of Central Florida Arena March 8-10. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  10. KSC-06pd0472

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During opening ceremonies of the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Kennedy Space Center Director Jim Kennedy talks to the participants. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  11. KSC-06pd0470

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - Florida's Lt. Governor Toni Jennings speaks during the V.I.P. luncheon at the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  12. KSC-07pd0615

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- The student team dressed in pink is a coordinated effort cosponsored by NASA KSC and representing Rockledge, Cocoa Beach and Viera High Schools in Central Florida. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  13. Technology Solutions for New and Existing Homes Case Study: Addressing Multifamily Piping Losses with Solar Hot Water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Springer, M. Seitzler, and C. Backman

    2016-12-01

    Sun Light & Power, a San Francisco Bay Area solar design-build contractor, teamed with the U.S. Department of Energy’s Building America partner the Alliance for Residential Building Innovation (ARBI) to study this heat-loss issue. The team added three-way valves to the solar water heating systems for two 40-unit multifamily buildings. In these systems, when the stored solar hot water is warmer than the recirculated hot water returning from the buildings, the valves divert the returning water to the solar storage tank instead of the water heater. This strategy allows solar-generated heat to be applied to recirculation heat loss in additionmore » to heating water that is consumed by fixtures and appliances.« less

  14. KSC-06pd0460

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Kennedy Space Center Director Jim Kennedy (left) greets members of the "Pink Team," whose robot is named Roccobot and is co-sponsored by NASA KSC. At least four teams in the competition were sponsored by KSC, NASA and contractors. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  15. KSC-06pd0468

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, team robots are in pursuit of balls on the competition floor, which they must catch and throw into a goal. At least four teams in the competition were sponsored by KSC, NASA and contractors. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  16. KSC-06pd0465

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Florida Governor Jeb Bush poses with the student team from Harmony High School in Florida called The Harmony Hurricanes. The high school was teamed with DeVry University, Disney World and the Town of Harmony. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  17. 38 CFR 39.21 - Space criteria for support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... building. The administrative building should be approximately 1,600 NSF in total, providing space, as... room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance/service building may be combined with the...

  18. Before you make that big decision...

    PubMed

    Kahneman, Daniel; Lovallo, Dan; Sibony, Olivier

    2011-06-01

    When an executive makes a big bet, he or she typically relies on the judgment of a team that has put together a proposal for a strategic course of action. After all, the team will have delved into the pros and cons much more deeply than the executive has time to do. The problem is, biases invariably creep into any team's reasoning-and often dangerously distort its thinking. A team that has fallen in love with its recommendation, for instance, may subconsciously dismiss evidence that contradicts its theories, give far too much weight to one piece of data, or make faulty comparisons to another business case. That's why, with important decisions, executives need to conduct a careful review not only of the content of recommendations but of the recommendation process. To that end, the authors-Kahneman, who won a Nobel Prize in economics for his work on cognitive biases; Lovallo of the University of Sydney; and Sibony of McKinsey-have put together a 12-question checklist intended to unearth and neutralize defects in teams' thinking. These questions help leaders examine whether a team has explored alternatives appropriately, gathered all the right information, and used well-grounded numbers to support its case. They also highlight considerations such as whether the team might be unduly influenced by self-interest, overconfidence, or attachment to past decisions. By using this practical tool, executives will build decision processes over time that reduce the effects of biases and upgrade the quality of decisions their organizations make. The payoffs can be significant: A recent McKinsey study of more than 1,000 business investments, for instance, showed that when companies worked to reduce the effects of bias, they raised their returns on investment by seven percentage points. Executives need to realize that the judgment of even highly experienced, superbly competent managers can be fallible. A disciplined decision-making process, not individual genius, is the key to good strategy.

  19. 2012 Alabama Lunabotics Systems Engineering Paper

    NASA Technical Reports Server (NTRS)

    Baker, Justin; Ricks, Kenneth; Hull, Bethanne J.

    2012-01-01

    Excavation will hold a key role for future lunar missions. NASA has stated that "advances in lunar regolith mining have the potential to significantly contribute to our nation's space vision and NASA space exploration operations." [1]. The Lunabotics Mining Competition is an event hosted by NASA that is meant to encourage "the development of innovative lunar excavation concepts from universities which may result in clever ideas and solutions which could be applied to an actual lunar excavation device or payload." [2]. Teams entering the competition must "design and build a remote controlled or autonomous excavator, called a lunabot, that can collect and deposit a minimum of 10 kilograms of lunar simulant within 10 minutes." [2]. While excavation will play an important part in lunar missions, there will still be many other tasks that would benefit from robotic assistance. An excavator might not be as well suited for these tasks as other types of robots might be. For example a lightweight rover would do well with reconnaissance, and a mobile gripper arm would be fit for manipulation, while an excavator would be comparatively clumsy and slow in both cases. Even within the realm of excavation it would be beneficial to have different types of excavators for different tasks, as there are on Earth. The Alabama Lunabotics Team at the University of Alabama has made it their goal to not only design and build a robot that could compete in the Lunabotics Mining Competition, but would also be a multipurpose tool for future NASA missions. The 2010-2011 resulting robot was named the Modular Omnidirectional Lunar Excavator (MOLE). Using the Systems Engineering process and building off of two years of Lunabotics experience, the 20ll-2012 Alabama Lunabotics team (Team NASACAR) has improved the MOLE 1.0 design and optimized it for the 2012 Lunabotics Competition rules [I]. A CAD model of MOLE 2.0 can be seen below in Fig. 1.

  20. Post-earthquake building safety assessments for the Canterbury Earthquakes

    USGS Publications Warehouse

    Marshall, J.; Barnes, J.; Gould, N.; Jaiswal, K.; Lizundia, B.; Swanson, David A.; Turner, F.

    2012-01-01

    This paper explores the post-earthquake building assessment program that was utilized in Christchurch, New Zealand following the Canterbury Sequence of earthquakes beginning with the Magnitude (Mw.) 7.1 Darfield event in September 2010. The aftershocks or triggered events, two of which exceeded Mw 6.0, continued with events in February and June 2011 causing the greatest amount of damage. More than 70,000 building safety assessments were completed following the February event. The timeline and assessment procedures will be discussed including the use of rapid response teams, selection of indicator buildings to monitor damage following aftershocks, risk assessments for demolition of red-tagged buildings, the use of task forces to address management of the heavily damaged downtown area and the process of demolition. Through the post-event safety assessment program that occurred throughout the Canterbury Sequence of earthquakes, many important lessons can be learned that will benefit future response to natural hazards that have potential to damage structures.

  1. SUNREL Applications | Buildings | NREL

    Science.gov Websites

    used by the building design team for energy analysis. Zion National Park Visitor's Center Grand Canyon National Park Bookstore NREL Thermal Test Facility NREL Wind Site Entrance Building DPD Office Building Performance Analysis of a High-Mass Residential Building Van Geet residence The Van Geet Off-Grid Home: An

  2. Research on Building Education and Workforce Capacity in Systems Engineering

    DTIC Science & Technology

    2012-01-31

    Professional Ethics Since one goal of RT-19A is to understand how best to increase the number of schools offering systems engineering capstone courses...project evaluation plan  Developed and issued the request for proposals and selection process (an independent review team and rubric) for...faculty members from both institutions talk frequently to share ideas, compare progress and clarify any issues . Auburn recruited faculty only, so

  3. Mitigating risks related to facilities management.

    PubMed

    O'Neill, Daniel P; Scarborough, Sydney

    2013-07-01

    By looking at metrics focusing on the functionality, age, capital investment, transparency, and sustainability (FACTS) of their organizations' facilities, facilities management teams can build potential business cases to justify upgrading the facilities. A FACTS analysis can ensure that capital spent on facilities will produce a higher or more certain ROI than alternatives. A consistent process for managing spending helps to avoid unexpected spikes that cost the enterprise more in the long run.

  4. Designing to Sample the Unknown: Lessons from OSIRIS-REx Project Systems Engineering

    NASA Technical Reports Server (NTRS)

    Everett, David; Mink, Ronald; Linn, Timothy; Wood, Joshua

    2017-01-01

    On September 8, 2016, the third NASA New Frontiers mission launched on an Atlas V 411. The Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) will rendezvous with asteroid Bennu in 2018, collect a sample in 2020, and return that sample to Earth in September 2023. The development team has overcome a number of challenges in order to design and build a system that will make contact with an unexplored, airless, low-gravity body. This paper will provide an overview of the mission, then focus in on the system-level challenges and some of the key system-level processes. Some of the lessons here are unique to the type of mission, like discussion of operating at a largely-unknown, low-gravity object. Other lessons, particularly from the build phase, have broad implications. The OSIRIS-REx risk management process was particularly effective in achieving an on-time and under-budget development effort. The systematic requirements management and verification and the system validation also helped identify numerous potential problems. The final assessment of the OSIRIS-REx performance will need to wait until the sample is returned in 2023, but this post-launch assessment will capture some of the key systems-engineering lessons from the development team.

  5. Build a Creative Leadership Team: Take a Unified Approach to Fostering Arts Education in Your School

    ERIC Educational Resources Information Center

    Principal, 2012

    2012-01-01

    Becoming a champion of arts education means establishing a culture that embraces a team approach toward integrating the arts. This article offers some practical guidance for developing a creative leadership team--and cultivating creativity in the whole school.

  6. Virtual Team Effectiveness: An Empirical Study Using SEM

    ERIC Educational Resources Information Center

    Bhat, Swati Kaul; Pande, Neerja; Ahuja, Vandana

    2016-01-01

    Advances in communication and information technology create new opportunities for organizations to build and manage virtual teams. Virtual teams have become a norm for organizations whose members work across disparate geographical locations, relying primarily or exclusively, on the usage of Information and Communications Technology (ICT) for the…

  7. Interdependence and Integration Learning in Student Project Teams: Do Team Project Assignments Achieve What We Want Them to?

    ERIC Educational Resources Information Center

    Skilton, Paul F.; Forsyth, David; White, Otis J.

    2008-01-01

    Building from research on learning in workplace project teams, the authors work forward from the idea that the principal condition enabling integration learning in student team projects is project complexity. Recognizing the challenges of developing and running complex student projects, the authors extend theory to propose that the experience of…

  8. Arch Venture Partners' investment considerations for CBRNE products and opportunities

    NASA Astrophysics Data System (ADS)

    Crandell, K.; Lazarus, S.; Gardner, P. J.

    2008-04-01

    ARCH is interested in building leading, highly-valued companies from leading research. Toward that end we value innovations created by the leading researchers in the world, many of which are funded to solve critical scientific challenges including those in the instrumentation and CBRNE area. The most important CBRNE innovations we have seen at ARCH are breakthroughs involving significant unaddressed technology risk and have the potential for broad proprietary intellectual property as a result. The model ARCH has evolved in instrumentation is to look for a breakthrough innovation, with strong intellectual property and continue to strengthen the patent estate through the life of the company. ARCH looks to build companies around leading interdisciplinary scientific and engineering teams, and we favor platform technology that can be applied to multiple market applications both commercial and government. As part of a strategy to build a great company, addressing important CBRNE challenges can help a company strengthen its technical team and its IP estate. This supports a focus on early low volume markets on the way toward addressing a fuller portfolio of applications. Experienced Venture Capitalists can help this process by identifying important executive talent, partners and applications, offering financial syndication strength, and helping shape the company's strategy to maximize the ultimate value realized.

  9. STAR Algorithm Integration Team - Facilitating operational algorithm development

    NASA Astrophysics Data System (ADS)

    Mikles, V. J.

    2015-12-01

    The NOAA/NESDIS Center for Satellite Research and Applications (STAR) provides technical support of the Joint Polar Satellite System (JPSS) algorithm development and integration tasks. Utilizing data from the S-NPP satellite, JPSS generates over thirty Environmental Data Records (EDRs) and Intermediate Products (IPs) spanning atmospheric, ocean, cryosphere, and land weather disciplines. The Algorithm Integration Team (AIT) brings technical expertise and support to product algorithms, specifically in testing and validating science algorithms in a pre-operational environment. The AIT verifies that new and updated algorithms function in the development environment, enforces established software development standards, and ensures that delivered packages are functional and complete. AIT facilitates the development of new JPSS-1 algorithms by implementing a review approach based on the Enterprise Product Lifecycle (EPL) process. Building on relationships established during the S-NPP algorithm development process and coordinating directly with science algorithm developers, the AIT has implemented structured reviews with self-contained document suites. The process has supported algorithm improvements for products such as ozone, active fire, vegetation index, and temperature and moisture profiles.

  10. Driving and sustaining culture change in Olympic sport performance teams: a first exploration and grounded theory.

    PubMed

    Cruickshank, Andrew; Collins, Dave; Minten, Sue

    2014-02-01

    Stimulated by growing interest in the organizational and performance leadership components of Olympic success, sport psychology researchers have identified performance director-led culture change as a process of particular theoretical and applied significance. To build on initial work in this area and develop practically meaningful understanding, a pragmatic research philosophy and grounded theory methodology were engaged to uncover culture change best practice from the perspective of newly appointed performance directors. Delivered in complex and contested settings, results revealed that the optimal change process consisted of an initial evaluation, planning, and impact phase adjoined to the immediate and enduring management of a multidirectional perception- and power-based social system. As the first inquiry of its kind, these findings provide a foundation for the continued theoretical development of culture change in Olympic sport performance teams and a first model on which applied practice can be based.

  11. Practices and Processes of Leading High Performance Home Builders in the Upper Midwest

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Von Thoma, E.; Ojczyk, C.

    2012-12-01

    The NorthernSTAR Building America Partnership team proposed this study to gain insight into the business, sales, and construction processes of successful high performance builders. The knowledge gained by understanding the high performance strategies used by individual builders, as well as the process each followed to move from traditional builder to high performance builder, will be beneficial in proposing more in-depth research to yield specific action items to assist the industry at large transform to high performance new home construction. This investigation identified the best practices of three successful high performance builders in the upper Midwest. In-depth field analysis of themore » performance levels of their homes, their business models, and their strategies for market acceptance were explored. All three builders commonly seek ENERGY STAR certification on their homes and implement strategies that would allow them to meet the requirements for the Building America Builders Challenge program. Their desire for continuous improvement, willingness to seek outside assistance, and ambition to be leaders in their field are common themes. Problem solving to overcome challenges was accepted as part of doing business. It was concluded that crossing the gap from code-based building to high performance based building was a natural evolution for these leading builders.« less

  12. The influence of social variables and moral disengagement on prosocial and antisocial behaviours in field hockey and netball.

    PubMed

    Boardley, Ian D; Kavussanu, Maria

    2009-06-01

    In this study, we examined: (a) the effects of perceived motivational climate and coaching character-building competency on prosocial and antisocial behaviours towards team-mates and opponents in field hockey and netball; (b) whether the effects of perceived character-building competency on sport behaviours are mediated by moral disengagement; and (c) whether these relationships are invariant across sport. Field hockey (n = 200) and netball (n = 179) players completed questionnaires assessing the aforementioned variables. Structural equation modelling indicated that mastery climate had positive effects on prosocial and negative effects on antisocial behaviour towards team-mates, while performance climate had a positive effect on antisocial behaviour towards team-mates. Perceived character-building competency had a positive effect on prosocial behaviour towards opponents and negative effects on the two antisocial behaviours; all of these effects were mediated by moral disengagement. No effect was found for prosocial behaviour towards team-mates. The model was largely invariant across sport. The findings aid our understanding of social influences on prosocial and antisocial behaviours in sport.

  13. The Potential of Grant Applications as Team Building Exercises: A Case Study

    ERIC Educational Resources Information Center

    Siemens, Lynne

    2010-01-01

    Faced with increasingly complex and technologically sophisticated research questions, academics are working with others through collaboration and research teams. To be effective, these research teams need to maximize the factors that contribute to success while minimizing the potentially negative impact of associated challenges. One particular…

  14. Green Team News and Upcoming Events | Poster

    Cancer.gov

    By Melissa Porter, Staff Writer Spring Plant Swap 2013 This past October, you may have seen several members of the Green Team standing in front of Building 549 giving out free plants or offering to take extra plants off your hands—this was the first Green Team Fall Plant Swap.

  15. Sharing the Literacy Load

    ERIC Educational Resources Information Center

    Orechovsky, Patricia

    2010-01-01

    The literacy team at Brentwood (NY) High School, a large urban high school, focused its efforts on building content-area teachers' literacy instruction skills. The team is made up of teachers from the various content areas, including physical education and art, as well as supportive administrators. The team developed a pacing guide, a monthly…

  16. Implementation of Water Safety Plans (WSPs): A Case Study in the Coastal Area in Semarang City, Indonesia

    NASA Astrophysics Data System (ADS)

    Budiyono; Ginandjar, P.; Saraswati, L. D.; Pangestuti, D. R.; Martini; Jati, S. P.

    2018-02-01

    An area of 508.28 hectares in North Semarang is flooded by tidal inundation, including Bandarharjo village, which could affect water quality in the area. People in Bandarharjo use safe water from deep groundwater, without disinfection process. More than 90% of water samples in the Bandaharjo village had poor bacteriological quality. The aimed of the research was to describe the implementation of Water Safety Plans (WSPs) program in Bandarharjo village. This was a descriptive study with steps for implementations adopted the guidelines and tools of the World Health Organization. The steps consist of introducing WSPs program, team building, training the team, examination of water safety before risk assessment, risk assessment, minor repair I, examination of water safety risk, minor repair II (after monitoring). Data were analyzed using descriptive methods. WSPs program has been introduced and formed WSPs team, and the training of the team has been conducted. The team was able to conduct risks assessment, planned the activities, examined water quality, conduct minor repair and monitoring at the source, distribution, and households connection. The WSPs program could be implemented in the coastal area in Semarang, however regularly supervision and some adjustment are needed.

  17. Supporting the use of theory in cross-country health services research: a participatory qualitative approach using Normalisation Process Theory as an example

    PubMed Central

    Mair, Frances S; Dowrick, Christopher; Brún, Mary O’Reilly-de; de Brún, Tomas; Burns, Nicola; Lionis, Christos; Saridaki, Aristoula; Papadakaki, Maria; van den Muijsenbergh, Maria; van Weel-Baumgarten, Evelyn; Gravenhorst, Katja; Cooper, Lucy; Princz, Christine; Teunissen, Erik; Mareeuw, Francine van den Driessen; Vlahadi, Maria; Spiegel, Wolfgang; MacFarlane, Anne

    2017-01-01

    Objectives To describe and reflect on the process of designing and delivering a training programme supporting the use of theory, in this case Normalisation Process Theory (NPT), in a multisite cross-country health services research study. Design Participatory research approach using qualitative methods. Setting Six European primary care settings involving research teams from Austria, England, Greece, Ireland, The Netherlands and Scotland. Participants RESTORE research team consisting of 8 project applicants, all senior primary care academics, and 10 researchers. Professional backgrounds included general practitioners/family doctors, social/cultural anthropologists, sociologists and health services/primary care researchers. Primary outcome measures Views of all research team members (n=18) were assessed using qualitative evaluation methods, analysed qualitatively by the trainers after each session. Results Most of the team had no experience of using NPT and many had not applied theory to prospective, qualitative research projects. Early training proved didactic and overloaded participants with information. Drawing on RESTORE’s methodological approach of Participatory Learning and Action, workshops using role play, experiential interactive exercises and light-hearted examples not directly related to the study subject matter were developed. Evaluation showed the study team quickly grew in knowledge and confidence in applying theory to fieldwork. Recommendations applicable to other studies include: accepting that theory application is not a linear process, that time is needed to address researcher concerns with the process, and that experiential, interactive learning is a key device in building conceptual and practical knowledge. An unanticipated benefit was the smooth transition to cross-country qualitative coding of study data. Conclusion A structured programme of training enhanced and supported the prospective application of a theory, NPT, to our work but raised challenges. These were not unique to NPT but could arise with the application of any theory, especially in large multisite, international projects. The lessons learnt are applicable to other theoretically informed studies. PMID:28827231

  18. Building an efficient surgical team using a bench model simulation: construct validity of the Legacy Inanimate System for Endoscopic Team Training (LISETT).

    PubMed

    Zheng, B; Denk, P M; Martinec, D V; Gatta, P; Whiteford, M H; Swanström, L L

    2008-04-01

    Complex laparoscopic tasks require collaboration of surgeons as a surgical team. Conventionally, surgical teams are formed shortly before the start of the surgery, and team skills are built during the surgery. There is a need to establish a training simulation to improve surgical team skills without jeopardizing the safety of surgery. The Legacy Inanimate System for Laparoscopic Team Training (LISETT) is a bench simulation designed to enhance surgical team skills. The reported project tested the construct validity of LISETT. The research question was whether the LISETT scores show progressive improvement correlating with the level of surgical training and laparoscopic team experience or not. With LISETT, two surgeons are required to work closely to perform two laparoscopic tasks: peg transportation and suturing. A total of 44 surgical dyad teams were recruited, composed of medical students, residents, laparoscopic fellows, and experienced surgeons. The LISETT scores were calculated according to the speed and accuracy of the movements. The LISETT scores were positively correlated with surgical experience, and the results can be generalized confidently to surgical teams (Pearson's coefficient, 0.73; p = 0.001). To analyze the influences of individual skill and team dynamics on LISETT performance, team quality was rated by team members using communication and cooperation characters after each practice. The LISETT scores are positively correlated with self-rated team quality scores (Pearson's coefficient, 0.39; p = 0.008). The findings proved LISETT to be a valid system for assessing cooperative skills of a surgical team. By increasing practice time, LISETT provides an opportunity to build surgical team skills, which include effective communication and cooperation.

  19. Dealing with the archetypes development process for a regional EHR system.

    PubMed

    Santos, M R; Bax, M P; Kalra, D

    2012-01-01

    This paper aims to present the archetype modelling process used for the Health Department of Minas Gerais State, Brazil (SES/MG), to support building its regional EHR system, and the lessons learned during this process. This study was undertaken within the Minas Gerais project. The EHR system architecture was built assuming the reference model from the ISO 13606 norm. The whole archetype development process took about ten months, coordinated by a clinical team co-ordinated by three health professionals and one systems analyst from the SES/MG. They were supported by around 30 health professionals from the internal SES/MG areas, and 5 systems analysts from the PRODEMGE. Based on a bottom-up approach, the project team used technical interviews and brainstorming sessions to conduct the modelling process. The main steps of the archetype modelling process were identified and described, and 20 archetypes were created. -The set of principles established during the selection of PCS elements helped the clinical team to keep the focus in their objectives;-The initial focus on the archetype structural organization aspects was important;-The data elements identified were subjected to a rigorous analysis aimed at determining the most suitable clinical domain;-Levelling the concepts to accommodate them within the hierarchical levels in the reference model was definitely no easy task, and the use of a mind mapping tool facilitated the modelling process;-Part of the difficulty experienced by the clinical team was related to a view focused on the original forms previously used;-The use of worksheets facilitated the modelling process by health professionals;-It was important to have a health professional that knew about the domain tables and health classifications from the Brazilian Federal Government as member in the clinical team. The archetypes (referencing terminology, domain tables and term lists) provided a favorable condition for the use of a controlled vocabulary between the central repository and the EMR systems and, probably, will increase the chances of preserving the semantics from the knowledge domain. Finally, the reference model from the ISO 13606 norm, along with the archetypes, proved sufficient to meet the specificities for the creation of an EHR system for basic healthcare in a Brazilian state.

  20. Work with Us | Buildings | NREL

    Science.gov Websites

    opportunities to take advantage of our residential and commercial buildings expertise. Here's how you can work commercial and public sectors to improve building energy performance is central to its mission. Learn about available for collaborative research opportunities. Commercial Solutions NREL's Commercial Buildings team

  1. The lean service machine.

    PubMed

    Swank, Cynthia Karen

    2003-10-01

    Jefferson Pilot Financial, a life insurance and annuities firm, like many U.S. service companies at the end of the 1990s was looking for new ways to grow. Its top managers recognized that JPF needed to differentiate itself in the eyes of its customers, the independent life-insurance advisers who sell and service policies. To establish itself as these advisers' preferred partner, it set out to reduce the turnaround time on policy applications, simplify the submission process, and reduce errors. JPF's managers looked to the "lean production" practices that U.S. manufacturers adopted in response to competition from Japanese companies. Lean production is built around the concept of continuous-flow processing--a departure from traditional production systems, in which large batches are processed at each step. JPF appointed a "lean team" to reengineer its New Business unit's operations, beginning with the creation of a "model cell"--a fully functioning microcosm of JPF's entire process. This approach allowed managers to experiment and smooth out the kinks while working toward an optimal design. The team applied lean-manufacturing practices, including placing linked processes near one another, balancing employees' workloads, posting performance results, and measuring performance and productivity from the customer's perspective. Customer-focused metrics helped erode the employees' "My work is all that matters" mind-set. The results were so impressive that JPF is rolling out similar systems across many of its operations. To convince employees of the value of lean production, the lean team introduced a simulation in which teams compete to build the best paper airplane based on invented customer specifications. This game drives home lean production's basic principles, establishing a foundation for deep and far-reaching changes in the production system.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Munro, J.F.; Kristal, J.; Thompson, G.

    The Office of Environmental Management is bringing Headquarters and the Field together to implement process improvements throughout the Complex through a systematic process of organizational learning called benchmarking. Simply stated, benchmarking is a process of continuously comparing and measuring practices, processes, or methodologies with those of other private and public organizations. The EM benchmarking program, which began as the result of a recommendation from Xerox Corporation, is building trust and removing barriers to performance enhancement across the DOE organization. The EM benchmarking program is designed to be field-centered with Headquarters providing facilitatory and integrative functions on an ``as needed`` basis.more » One of the main goals of the program is to assist Field Offices and their associated M&O/M&I contractors develop the capabilities to do benchmarking for themselves. In this regard, a central precept is that in order to realize tangible performance benefits, program managers and staff -- the ones closest to the work - must take ownership of the studies. This avoids the ``check the box`` mentality associated with some third party studies. This workshop will provide participants with a basic level of understanding why the EM benchmarking team was developed and the nature and scope of its mission. Participants will also begin to understand the types of study levels and the particular methodology the EM benchmarking team is using to conduct studies. The EM benchmarking team will also encourage discussion on ways that DOE (both Headquarters and the Field) can team with its M&O/M&I contractors to conduct additional benchmarking studies. This ``introduction to benchmarking`` is intended to create a desire to know more and a greater appreciation of how benchmarking processes could be creatively employed to enhance performance.« less

  3. What is happening under the surface? Power, conflict and the performance of medical teams.

    PubMed

    Janss, Rozemarijn; Rispens, Sonja; Segers, Mien; Jehn, Karen A

    2012-09-01

    The effect of teamwork on team performance is broadly recognised in the medical field. This recognition is manifested in educational programmes in which attention to interpersonal behaviours during teamwork is growing. Conflict and power differences influence interpersonal behaviours and are marked topics in studies of group functioning in the social and organisational psychology literature. Insights from the domain of social sciences put the ongoing improvement of teamwork into broader perspective. This paper shows how knowledge from the domain of social and organisational psychology contributes to the understanding of teamwork in the medical environment. More specifically, this paper suggests that unfolding the underlying issues of power and conflict within medical teams can be of extra help in the development of educational interventions aimed at improving team performance. We review the key social psychology and organisational behaviour literature concerning power and conflict, and relate the insights derived from this to the team process of ad hoc medical action teams. We present a theoretical framework in which insights into power and conflict are used to explain and predict team dynamics in ad hoc medical action teams. Power and conflict strongly influence interpersonal behaviour. Characteristics of medical action teams give rise to all kinds of issues of disagreement and are accompanied by complex issues of intra-team power distribution. We argue that how team members coordinate, cooperate and communicate is steered by members' personal motivations, which, in turn, strongly depend on their perceptions of power and conflict. Given the importance of the performance of these teams, we suggest future directions for the development of training interventions building on knowledge and theories derived from social and organisational psychology. © Blackwell Publishing Ltd 2012.

  4. Building and expanding interprofessional teaching teams.

    PubMed

    Darlow, Ben; McKinlay, Eileen; Gallagher, Peter; Beckingsale, Louise; Coleman, Karen; Perry, Meredith; Pullon, Sue

    2017-03-01

    INTRODUCTION Interprofessional education (IPE) aims to prepare learners to work in collaborative health-care teams. The University of Otago, Wellington has piloted, developed and expanded an IPE programme since 2011. An interprofessional teaching team has developed alongside this programme. AIMS This study aimed to understand the development of a university-based interprofessional teaching team over a 4-year period and generate insights to aid the development of such teams elsewhere. METHODS Two semi-structured audio-recorded educator focus groups were conducted at key times in the development of the IPE programme in 2011 and 2014. The programme focused on long-term condition management and involved students from dietetics, medicine, physiotherapy and radiation therapy. Focus group transcripts were independently analysed by two researchers using Thematic Analysis to identify broad themes. Initial themes were compared, discussed and combined to form a thematic framework. The thematic framework was verified by the education team and subsequently updated and reorganised. RESULTS Three key themes emerged: (i) development as an interprofessional educator; (ii) developing a team; and (iii) risk and reward. Teaching in an interprofessional environment was initially daunting but confidence increased with experience. Team teaching highlighted educators' disciplinary roles and skill sets and exposed educators to different teaching approaches. Educators perceived they modelled team development processes to students through their own development as a team. Interprofessional teaching was challenging to organise but participation was rewarding. Programme expansion increased the risks and complexity, but also acted as a stimulus for development and energised the teaching team. DISCUSSION Interprofessional teaching is initially challenging but ultimately enriching. Interprofessional teaching skills take time to develop and perspectives of role change over time. Educator team development is aided by commitment, understanding, enthusiasm, leadership and trust.

  5. Team Mentoring for Interdisciplinary Team Science: Lessons From K12 Scholars and Directors.

    PubMed

    Guise, Jeanne-Marie; Geller, Stacie; Regensteiner, Judith G; Raymond, Nancy; Nagel, Joan

    2017-02-01

    Mentoring is critical for academic success. As science transitions to a team science model, team mentoring may have advantages. The goal of this study was to understand the process, benefits, and challenges of team mentoring relating to career development and research. A national survey was conducted of Building Interdisciplinary Research Careers in Women's Health (BIRCWH) program directors-current and former scholars from 27 active National Institutes of Health (NIH)-funded BIRCWH NIH K12 programs-to characterize and understand the value and challenges of the team approach to mentoring. Quantitative data were analyzed descriptively, and qualitative data were analyzed thematically. Responses were received from 25/27 (93%) program directors, 78/108 (72%) current scholars, and 91/162 (56%) former scholars. Scholars reported that team mentoring was beneficial to their career development (152/169; 90%) and research (148/169; 88%). Reported advantages included a diversity of opinions, expanded networking, development of stronger study designs, and modeling of different career paths. Challenges included scheduling and managing conflicting opinions. Advice by directors offered to junior faculty entering team mentoring included the following: not to be intimidated by senior mentors, be willing to navigate conflicting advice, be proactive about scheduling and guiding discussions, have an open mind to different approaches, be explicit about expectations and mentors' roles (including importance of having a primary mentor to help navigate discussions), and meet in person as a team. These findings suggest that interdisciplinary/interprofessional team mentoring has many important advantages, but that skills are required to optimally utilize multiple perspectives.

  6. Team Mentoring for Interdisciplinary Team Science: Lessons from K12 Scholars and Directors

    PubMed Central

    Guise, Jeanne-Marie; Geller, Stacie; Regensteiner, Judith G.; Raymond, Nancy; Nagel, Joan

    2016-01-01

    Purpose Mentoring is critical for academic success. As science transitions to a team science model, team mentoring may have advantages. The goal of this study was to understand the process, benefits, and challenges of team mentoring relating to career development and research. Method A national survey was conducted of Building Interdisciplinary Research Careers in Women’s Health (BIRCWH) program directors, current and former scholars s from 27 active National Institutes of Health (NIH)-funded BIRCWH NIH K12 programs to characterize and understand the value and challenges of the team approach to mentoring. Quantitative data were analyzed descriptively and qualitative thematically. Results Responses were received from 25/27 (93%) of program directors, 78/108 (72%) current scholars, and 91/162 (56%) former scholars. Scholars reported that team mentoring was beneficial to their career development (152/169, 90%) and research (148/169, 88%). Reported advantages included a diversity of opinions, expanded networking, development of stronger study designs, and modeling of different career paths. Challenges included scheduling and managing conflicting opinions. Advice by directors offered to junior faculty entering team mentoring included: not to be intimidated by senior mentors, be willing to navigate conflicting advice, be proactive about scheduling and guiding discussions, have an open mind to different approaches, be explicit about expectations and mentors’ roles (including importance of having a primary mentor to help navigate discussions), and meeting in person as a team. Conclusions These findings suggest that interdisciplinary/interprofessional team mentoring has many important advantages, but that skills are required to optimally utilize multiple perspectives. PMID:27556675

  7. Building an Undergraduate STEM Team Using Team-Based Learning Leading to the Production of a Storyboard Appropriate for Elementary Students

    ERIC Educational Resources Information Center

    Cutright, Teresa J.; Evans, Edward; Brantner, Justin S.

    2014-01-01

    A unique undergraduate team that spans five different engineering disciplines, chemistry, biology, and mathematics was formed. The team was formed to promote cross-disciplinary learning, to improve retention, and to prepare the students for the kind of problems they will face in their careers. This paper describes the variety of activities used…

  8. The Czech Provincial Reconstruction Team: Civil-Military Teaming in Logar Province

    DTIC Science & Technology

    2013-03-01

    which authorized ISAF forces to assist Afghan authorities in providing security through ISAF operations across Afghanistan. Alexandr Vondra, the...Ministry of Defense Alexandr Vondra, web site Provincional Reconstruction Team Logar news, the Czech Republic, http://www.mzv.cz/prtlogar/cz...Meade Avenue, Building 50 Fort Leavenworth, 1-3. 4 Handbook Afghanistan Provincial Reconstruction Team No.11-16, Feb.11 published by Center for

  9. Bill Livingood | NREL

    Science.gov Websites

    Bill Livingood Photo of Bill Livingood Bill Livingood Group Manager, Commercial Buildings manager of the commercial buildings research team, he oversees the development of next generation

  10. Memorandums of Understanding

    EPA Pesticide Factsheets

    Since 2006, the Green Team has signed memorandums of understanding [MOU's] with local professional sports teams, major real estate firms and developers, and colleges and universities to reduce the environmental impacts of their buildings and projects.

  11. Energy Systems Integration Facility Named Lab of the Year | News | NREL

    Science.gov Websites

    series of LEED Platinum high-performance buildings at NREL. Constructed by the design-build team of medium voltage outdoor testing areas. The total cost to build and equip ESIF was $135 million. "To

  12. 38 CFR 59.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... program must provide individualized care delivered by an interdisciplinary health care team and support... domiciliary or nursing home buildings, the expansion, remodeling, or alteration of existing buildings for the... provision of initial equipment for any such buildings. Domiciliary care means providing shelter, food, and...

  13. 38 CFR 59.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... program must provide individualized care delivered by an interdisciplinary health care team and support... domiciliary or nursing home buildings, the expansion, remodeling, or alteration of existing buildings for the... provision of initial equipment for any such buildings. Domiciliary care means providing shelter, food, and...

  14. 38 CFR 59.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... program must provide individualized care delivered by an interdisciplinary health care team and support... domiciliary or nursing home buildings, the expansion, remodeling, or alteration of existing buildings for the... provision of initial equipment for any such buildings. Domiciliary care means providing shelter, food, and...

  15. 38 CFR 59.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... program must provide individualized care delivered by an interdisciplinary health care team and support... domiciliary or nursing home buildings, the expansion, remodeling, or alteration of existing buildings for the... provision of initial equipment for any such buildings. Domiciliary care means providing shelter, food, and...

  16. 38 CFR 59.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... program must provide individualized care delivered by an interdisciplinary health care team and support... domiciliary or nursing home buildings, the expansion, remodeling, or alteration of existing buildings for the... provision of initial equipment for any such buildings. Domiciliary care means providing shelter, food, and...

  17. Challenges of transitioning from a faculty to an administrative role: part 2, moving from individual contributor to group leader.

    PubMed

    Thompson, Cesarina M

    2011-01-01

    Many new nursing leaders assuming deanships, assistant, or interim deanships have limited education, experience, or background to prepare them for the job. To assist new deans and those aspiring to be deans, Jana L. Pressler, PhD, RN, and Carole A. Kenner, PhD, RNC-NIC, FAAN, the editors of this department, address common issues, challenges, and opportunities that face academic executive teams, such as negotiating an executive contract, obtaining faculty lines, building effective work teams, managing difficult employees, and creating nimble organizational structure to respond to changing consumer, healthcare delivery, and community needs. In this article, the editors asked guest author, Dr Cesarina Thompson, to discuss the transition process from faculty to administrative role.

  18. A Drop in the Bucket or a Pebble in a Pond: Commercial Building Partners’ Replication of EEMs Across Their Portfolios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Antonopoulos, Chrissi A.; Baechler, Michael C.; Dillon, Heather E.

    This study presents findings from questionnaire and interview data investigating replication efforts of Commercial Building Partnership (CBP) partners that worked directly with the Pacific Northwest National Laboratory (PNNL). PNNL partnered with 12 organizations on new and retrofit construction projects as part of the U.S. Department of Energy (DOE) CBP program. PNNL and other national laboratories collaborate with industry leaders that own large portfolios of buildings to develop high performance projects for new construction and renovation. This project accelerates market adoption of commercially available energy saving technologies into the design process for new and upgraded commercial buildings. The labs provide assistancemore » to the partners’ design teams and make a business case for energy investments. From the owner’s perspective, a sound investment results in energy savings based on corporate objectives and design. Through a feedback questionnaire, along with personal interviews, PNNL gathered qualitative and quantitative information relating to replication efforts by each organization. Data through this process were analyzed to provide insight into two primary research areas: 1) CBP partners’ replication efforts of technologies and approaches used in the CBP project to the rest of the organization’s building portfolio (including replication verification), and, 2) the market potential for technology diffusion into the total U.S. commercial building stock, as a direct result of the CBP entire program.« less

  19. Developing patient-centered teams: The role of sharing stories about patients and patient care.

    PubMed

    Bennett, Ariana H; Hassinger, Jane A; Martin, Lisa A; Harris, Lisa H; Gold, Marji

    2015-09-01

    Research indicates that health care teams are good for staff, patients, and organizations. The characteristics that make teams effective include shared objectives, mutual respect, clarity of roles, communication, trust, and collaboration. We were interested in examining how teams develop these positive characteristics. This paper explores the role of sharing stories about patients in developing patient-centered teams. Data for this paper came from 1 primary care clinic as part of a larger Providers Share Workshop study conducted by the University of Michigan. Each workshop included 5 facilitated group sessions in which staff met to talk about their work. This paper analyzes qualitative data from the workshops. Through an iterative process, research team members identified major themes, developed a coding scheme, and coded transcripts for qualitative data analysis. One of the most powerful ways group members connected was through sharing stories about their patients. Sharing clinical cases and stories helped participants bond around their shared mission of patient-centered care, build supportive relationships, enhance compassion for patients, communicate and resolve conflict, better understand workflows and job roles, develop trust, and increase morale. These attributes highlighted by participants correspond to those documented in the literature as important elements of teambuilding and key indicators of team effectiveness. The sharing of stories about patients seems to be a promising tool for positive team development in a primary care clinical setting and should be investigated further. (c) 2015 APA, all rights reserved).

  20. Knowledge integration, teamwork and performance in health care.

    PubMed

    Körner, Mirjam; Lippenberger, Corinna; Becker, Sonja; Reichler, Lars; Müller, Christian; Zimmermann, Linda; Rundel, Manfred; Baumeister, Harald

    2016-01-01

    Knowledge integration is the process of building shared mental models. The integration of the diverse knowledge of the health professions in shared mental models is a precondition for effective teamwork and team performance. As it is known that different groups of health care professionals often tend to work in isolation, the authors compared the perceptions of knowledge integration. It can be expected that based on this isolation, knowledge integration is assessed differently. The purpose of this paper is to test these differences in the perception of knowledge integration between the professional groups and to identify to what extent knowledge integration predicts perceptions of teamwork and team performance and to determine if teamwork has a mediating effect. The study is a multi-center cross-sectional study with a descriptive-explorative design. Data were collected by means of a staff questionnaire for all health care professionals working in the rehabilitation clinics. The results showed that there are significant differences in knowledge integration within interprofessional health care teams. Furthermore, it could be shown that knowledge integration is significantly related to patient-centered teamwork as well as to team performance. Mediation analysis revealed partial mediation of the effect of knowledge integration on team performance through teamwork. PRACTICAL/IMPLICATIONS: In practice, the results of the study provide a valuable starting point for team development interventions. This is the first study that explored knowledge integration in medical rehabilitation teams and its relation to patient-centered teamwork and team performance.

  1. STS-335 crew and training team during Bailout training

    NASA Image and Video Library

    2010-12-03

    STS-335 crew and training team during Bailout training with instructors Bob Behrendsen and Patrick Jones. Photo Date: December 3, 2010. Location: Building 9NW - CCT-II Mockup. Photographer: Robert Markowitz.

  2. Understanding the Adaptive Use of Virtual World Technology Capabilities and Trust in Virtual Teams

    ERIC Educational Resources Information Center

    Owens, Dawn

    2012-01-01

    In an environment of global competition and constant technological change, the use of virtual teams has become commonplace for many organizations. Virtual team members are geographically and temporally dispersed, experience cultural diversity, and lack shared social context and face-to-face encounters considered as irreplaceable for building and…

  3. Health Professions Team Building through Pharmacy, Dentistry, Optometry, and Podiatry: The 1992-93 AACP Argus Commission Report.

    ERIC Educational Resources Information Center

    Journal of Optometric Education, 1995

    1995-01-01

    The Argus Commission, asked to examine the interface between academic pharmacy and education programs in dentistry, optometry, and podiatry, envisioned a primary health care team and considered mechanisms for encouraging development of such teams and reducing competition. Its conclusions and recommendations are summarized here. (MSE)

  4. Team Building for School Change: Equipping Teachers for New Roles.

    ERIC Educational Resources Information Center

    Maeroff, Gene I.

    Focusing on teacher teams and their use as a lever for change, the author examines the importance of teachers becoming knowledgeable, skilled, and increasingly articulate about their leadership and participation so that they may take their rightful place in the school reform movement. Ten chapters focus on teams sponsored by the Rockefeller…

  5. Effective Interprofessional Teams: "Contact Is Not Enough" to Build a Team

    ERIC Educational Resources Information Center

    Sargeant, Joan; Loney, Elaine; Murphy, Gerard

    2008-01-01

    Introduction: Teamwork and interprofessional practice and learning are becoming integral to health care. It is anticipated that these approaches can maximize professional resources and optimize patient care. Current research, however, suggests that primary health care teams may lack the capacity to function at a level that enhances the individual…

  6. Building Action Research Teams: A Case of Struggles and Successes

    ERIC Educational Resources Information Center

    Du, Fengning

    2009-01-01

    Teaching teams can hold the promise of being an ideal vehicle in which collaborative action research is conducted. This case documents the mixed results of a team leader's efforts to improve teaching and introduce inquiry-based professional development through action research in a community college. This case paints a realistic and…

  7. A Survey of Knowledge Management Skills Acquisition in an Online Team-Based Distributed Computing Course

    ERIC Educational Resources Information Center

    Thomas, Jennifer D. E.

    2007-01-01

    This paper investigates students' perceptions of their acquisition of knowledge management skills, namely thinking and team-building skills, resulting from the integration of various resources and technologies into an entirely team-based, online upper level distributed computing (DC) information systems (IS) course. Results seem to indicate that…

  8. Learning to Fly? First Experiences on Team Learning of Icaros Cooperative

    ERIC Educational Resources Information Center

    Juvonen, Pasi

    2013-01-01

    Icaros is an information technology (IT) cooperative that was originally owned by 11 IT degree programme students of Saimaa University of Applied Sciences. This article describes experiences and challenges of team building of these students who are called "teampreneurs" during their first year as team entrepreneurs. The findings provided…

  9. 78 FR 65292 - North Pacific Fishery Management Council (NPFMC); Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ..., 7600 Sand Point Way NE., Building 4, Observer Training Room 1055 (GOA Plan Team) and Traynor Room 2076 (BS/AI Plan Team), Seattle, WA. Council address: North Pacific Fishery Management Council, 605 W. 4th... Sea/Aleutian Islands (BSAI) Groundfish Plan Teams will meet in Seattle, WA. DATES: The meetings will...

  10. Peenemunde Rocket Team Reunion

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Peenemunde Rocket Team reunited on the steps of Marshall Space Flight Center's (MSFC) Headquarter Building 4200 for a reunion. The Peenemunde Rocket team were first assembled in Germany prior to World War II. They came to the United States at the end of the War and became the nucleus of the United States Army's rocket program.

  11. Designing and Building a Cardboard Chair: Children's Engineering at the TECA Eastern Regional Conference

    ERIC Educational Resources Information Center

    Linnell, Charles C.

    2007-01-01

    This article describes the 2006 Technology Education Collegiate Association (TECA) Eastern Regional elementary competition, wherein teams of technology education students from nine different universities designed and built cardboard chairs. The competition required the teams (four or five to a team) from universities up and down the East Coast to…

  12. Self-Managed Teams for Library Management: Increasing Employee Participation via Empowerment.

    ERIC Educational Resources Information Center

    Poon-Richards, Craig

    1995-01-01

    Investigates the growing prevalence of participatory management in libraries. The operation of self-managed teams is discussed both in theory and in practice, the latter with examples from Sterling Library at Yale University. Research is summarized that relates to management teams and how they create a sense of empowerment by building shared…

  13. 78 FR 51711 - North Pacific Fishery Management Council (NPFMC); Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... Sea/Aleutian Islands (BS/AI) groundfish plan teams will meet in Seattle, WA. DATES: The meetings will... Science Center, 7600 Sand Point Way NE., Building 4, National Marine Mammal Lab Room 2039 (GOA Plan Team) and Traynor Room 2076 (BS/AI Plan Team, Joint meeting), Seattle, WA. Council address: North Pacific...

  14. Using the Everest Team Simulation to Teach Threshold Concepts

    ERIC Educational Resources Information Center

    Nichols, Elizabeth; Wright, April L.

    2015-01-01

    This resource review focuses on "Leadership and Team Simulation: Everest V2" released by Harvard Business Publishing. The review describes the simulation's story line of a commercial team expedition climbing to the summit of Mount Everest along with the simulation's architecture and key features. Building on Wright and Gilmore's (2012)…

  15. KSC-07pd0619

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- The student team no. 233 dressed in pink controls its robot during competition in the FIRST robotics event held at the University of Central Florida Arena March 8-10. The team is a coordinated effort co-sponsored by NASA KSC and representing Rockledge, Cocoa Beach and Viera High Schools in Central Florida. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  16. KSC-06pd0466

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Kennedy Space Center Director Jim Kennedy greets members of one of the robotic teams. To the left of Kennedy is Neil Berger, the center director's intern; at right of Kennedy is Chris Fairey, retired NASA and Regional Planning Committee co-chair. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  17. KSC-07pd0620

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- During the FIRST robotics event held at the University of Central Florida Arena March 8-10, Center Director Bill Parsons (center) dons the pink wig that represents team no. 233, composed of students from Rockledge, Cocoa Beach and Viera High Schools in Central Florida. The team is cosponsored by NASA KSC. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  18. Building social capital with interprofessional student teams in rural settings: A service-learning model.

    PubMed

    Craig, Pippa L; Phillips, Christine; Hall, Sally

    2016-08-01

    To describe outcomes of a model of service learning in interprofessional learning (IPL) aimed at developing a sustainable model of training that also contributed to service strengthening. A total of 57 semi-structured interviews with key informants and document review exploring the impacts of interprofessional student teams engaged in locally relevant IPL activities. Six rural towns in South East New South Wales. Local facilitators, staff of local health and other services, health professionals who supervised the 89 students in 37 IPL teams, and academic and administrative staff. Perceived benefits as a consequence of interprofessional, service-learning interventions in these rural towns. Reported outcomes included increased local awareness of a particular issue addressed by the team; improved communication between different health professions; continued use of the team's product or a changed procedure in response to the teams' work; and evidence of improved use of a particular local health service. Given the limited workforce available in rural areas to supervise clinical IPL placements, a service-learning IPL model that aims to build social capital may be a useful educational model. © 2015 National Rural Health Alliance Inc.

  19. Athletes' perceptions of coaching competency and team conflict in sport teams: A multilevel analysis.

    PubMed

    González-Ponce, I; Leo, F M; Jiménez, R; Sánchez-Oliva, D; Sarmento, H; Figueiredo, A; García-Calvo, T

    2018-04-23

    The purpose of this study was to examine the relationship between coaching competency and team conflict, at individual and team levels, over the season. The participants were professional female and male soccer players, who participated in the First and Second Division. A longitudinal study was performed. At Time 1, the sample of participants consisted of 581 soccer players aged between 15 and 39 years. At Time 2, 549 players were recruited from the original sample aged between 15 and 37 years. Finally, at Time 3, the sample comprised 576 players aged between 15 and 37 years. All participants completed a multi-section questionnaire assessing coaching competency (motivation, game strategy, technique competency, and character-building competency) and team conflict (task conflict and relationship conflict). Results showed that both task and relationship conflict increased significantly over time. Multilevel modelling analysis showed that game strategy and character-building competencies negatively predicted both task and relationship conflicts at the individual level, whereas motivation competency was also added as a significant predictor of task conflict at the team level. Moreover, technique competency positively predicted task conflict at the team level. The current study suggests the importance of coaching competency in group dynamics in sport.

  20. NAME Modeling and Climate Process Team

    NASA Astrophysics Data System (ADS)

    Schemm, J. E.; Williams, L. N.; Gutzler, D. S.

    2007-05-01

    NAME Climate Process and Modeling Team (CPT) has been established to address the need of linking climate process research to model development and testing activities for warm season climate prediction. The project builds on two existing NAME-related modeling efforts. One major component of this project is the organization and implementation of a second phase of NAMAP, based on the 2004 season. NAMAP2 will re-examine the metrics proposed by NAMAP, extend the NAMAP analysis to transient variability, exploit the extensive observational database provided by NAME 2004 to analyze simulation targets of special interest, and expand participation. Vertical column analysis will bring local NAME observations and model outputs together in a context where key physical processes in the models can be evaluated and improved. The second component builds on the current NAME-related modeling effort focused on the diurnal cycle of precipitation in several global models, including those implemented at NCEP, NASA and GFDL. Our activities will focus on the ability of the operational NCEP Global Forecast System (GFS) to simulate the diurnal and seasonal evolution of warm season precipitation during the NAME 2004 EOP, and on changes to the treatment of deep convection in the complicated terrain of the NAMS domain that are necessary to improve the simulations, and ultimately predictions of warm season precipitation These activities will be strongly tied to NAMAP2 to ensure technology transfer from research to operations. Results based on experiments conducted with the NCEP CFS GCM will be reported at the conference with emphasis on the impact of horizontal resolution in predicting warm season precipitation over North America.

  1. Organizational determinants of interprofessional collaboration in integrative health care: systematic review of qualitative studies.

    PubMed

    Chung, Vincent C H; Ma, Polly H X; Hong, Lau Chun; Griffiths, Sian M

    2012-01-01

    Inteprofessional collaboration (IPC) between biomedically trained doctors (BMD) and traditional, complementary and alternative medicine practitioners (TCAMP) is an essential element in the development of successful integrative healthcare (IHC) services. This systematic review aims to identify organizational strategies that would facilitate this process. We searched 4 international databases for qualitative studies on the theme of BMD-TCAMP IPC, supplemented with a purposive search of 31 health services and TCAM journals. Methodological quality of included studies was assessed using published checklist. Results of each included study were synthesized using a framework approach, with reference to the Structuration Model of Collaboration. Thirty-seven studies of acceptable quality were included. The main driver for developing integrative healthcare was the demand for holistic care from patients. Integration can best be led by those trained in both paradigms. Bridge-building activities, positive promotion of partnership and co-location of practices are also beneficial for creating bonding between team members. In order to empower the participation of TCAMP, the perceived power differentials need to be reduced. Also, resources should be committed to supporting team building, collaborative initiatives and greater patient access. Leadership and funding from central authorities are needed to promote the use of condition-specific referral protocols and shared electronic health records. More mature IHC programs usually formalize their evaluation process around outcomes that are recognized both by BMD and TCAMP. The major themes emerging from our review suggest that successful collaborative relationships between BMD and TCAMP are similar to those between other health professionals, and interventions which improve the effectiveness of joint working in other healthcare teams with may well be transferable to promote better partnership between the paradigms. However, striking a balance between the different practices and preserving the epistemological stance of TCAM will remain the greatest challenge in successful integration.

  2. Building Performance Optimization while Empowering Occupants Toward Environmentally Sustainable Behavior through Continuous Monitoring and Diagnostics

    DTIC Science & Technology

    2016-12-01

    investment at the PaANG installation. In compliance with the NIST handbook’s guidelines, the team used the actual energy prices of the buildings...Costing Manual for the Federal Energy Management Program. For example, the team used the actual energy price and the measured energy consumption at the...least 30% of a DOD building’s HVAC and plug load annual energy consumption can be saved through continuous diagnostics and controls, while empowering

  3. Architectural Implications of DevOps

    DTIC Science & Technology

    2014-03-27

    Project Management Approach Size Metrics Years In Use Release Cadence CI Cadence A Agile/ Scrum (last 2 years and traditional before...that) 1M SLOC 17 Client release available every 2 months (not all accept it) Daily CI build B Water/ Scrum /F all 3M SLOC, team size 6– 8...90,000 users 3+ Internal release every 2–3 weeks, external release as needed Daily CI build C Agile/ Scrum Team size 30 2+ Internal release every

  4. Evolution of the concept of Capacity-building, results achieved during the past years and the future

    NASA Astrophysics Data System (ADS)

    Laffaiteur, M.; Camacho, S.

    Capacity-building is one of the key elements for the implementation of space applications programmes, particularly in developing countries. As early as 1982, the work programme of the United Nations Programme on Space Applications was expanded in order to promote education and training by organizing seminars, training courses and workshops in various areas, such as astronomy, telecommunications and Earth observation. In the framework of this Programme, the Office for Outer Space Affairs undertook the initiative, at the beginning of the 1990's, aimed at establishing regional centres for space science and technology education, affiliated to the United Nations and located in developing countries. These centres have started their activities between 1995 and 2000 in Africa, Asia and the Pacific, and Latin America and the Caribbean. The centres are based on the concept that by pooling material and human resources, developing countries can have education and training centres, of an international-level quality. A considerable impetus has been given to capacity-building after the UNISPACE III Conference, in particular in the "Vienna Declaration on Space and Human Development". The necessity to enhance capacity-building through the development of human and budgetary resources, the training of teachers, the exchange of teaching methods, materials and experience and the development of infrastructure and policy regulatories. In the process of the implementation of the recommendations of UNISPACE III, Action Teams led by Governments were established. One of them was exclusively dealing with capacity-building. Its proposals have been reviewed last June by the Committee on the Peaceful Uses of Outer Space (COPUOS) and will be examined, among other reports of Action Teams, by the General Assembly in next October. A lot of work has been done during the past years and have produced very important results. But there is still an important gap in capacity-building between space-faring countries and developing countries. A strategy has been presented by the Action Team in order to implement a strategy aimed at increasing again the impact of the various initiatives already going on. The promotion of the sharing of educational materials and information could be facilitated by a network of bodies in UN Member States, dedicated organizations and UN regional centres. This presentation will aim to show the current status of this issue and to present results already achieved and the way forward.

  5. Early Design Energy Analysis Using Building Information Modeling Technology

    DTIC Science & Technology

    2011-11-01

    building, (a) floor plan and (b) 3D image. ....................................... 50 Figure 28. Comparison of different energy estimates...when they make the biggest impact on building life-cycle costs. Traditionally, most building energy analyses have been conducted late in design, by...complete energy analysis. This method enables project teams to make energy conscious decisions early in design when they impact building life-cycle

  6. Energy Smarts Team Training Manual. A Teacher's Guide to Energy Conservation Activities for Grades 3-8.

    ERIC Educational Resources Information Center

    Oregon State Univ., Corvallis. Extension Service.

    Energy Smarts Team members are energy conscious students who want to save energy at school and at home. Students in a classroom and their teacher form an Energy Smarts Team. Selected students monitor their building each day at recess, lunch, or after school for lights or other electrical equipment that has been left on. The team members keep a log…

  7. Sample Return Robot Centennial Challenge

    NASA Image and Video Library

    2012-06-16

    Team members of "Survey" drive their robot around the campus on Saturday, June 16, 2012 at the Worcester Polytechnic Institute (WPI) in Worcester, Mass. The Survey team was one of the final teams participating in the NASA-WPI Sample Return Robot Centennial Challenge at WPI. Teams were challenged to build autonomous robots that can identify, collect and return samples. NASA needs autonomous robotic capability for future planetary exploration. Photo Credit: (NASA/Bill Ingalls)

  8. KSC-07pd0623

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- Center Director Bill Parsons (right) talks with students of another NASA-sponsored robotic team during the FIRST robotics event held at the University of Central Florida Arena March 8-10. Next to Parsons is Lisa Malone, director of External Relations at Kennedy Space Center. The students of team 1592, the Bionic Tigers, represent the cosponsors Analex Corporation and NASA Launch Services Program and Cocoa High School in Central Florida. Participating since 2005, this is the first year for this team to receive NASA financial support. They were mentored by the Pink Team. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  9. 38 CFR 39.62 - Space criteria for support facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assignment for the next 10 years. (a) Administrative building. The administrative building should be.../office/equipment/work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The...

  10. 38 CFR 39.62 - Space criteria for support facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 10 years. (a) Administrative building. The administrative building should be approximately 1,600 NSF.../work area); (5) Family/conference room; (6) Military honors team; (7) Refreshment unit; (8) Housekeeping aide's closet; and (9) Restroom facilities. (b) Maintenance/service building. The maintenance...

  11. KSC-06pd0464

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During opening ceremonies of the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Florida Governor Jeb Bush poses with recipients of the Governor's Award trophy. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  12. KSC-07pd0613

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- Student teams representing Florida and several out-of-state areas display and work on their robots for the FIRST robotics event held at the University of Central Florida Arena March 8-10. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  13. KSC-07pd0614

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- Competing robots try to loop the large metal target with colored rings. The robots are products of student teams taking part in the FIRST robotics event held at the University of Central Florida Arena March 8-10. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  14. KSC-07pd0612

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- Competing robots try to loop the large meta target with colored rings. The robots are products of student teams taking part in the FIRST robotics event held at the University of Central Florida Arena March 8-10. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

  15. KSC-06pd0462

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - Opening ceremonies of the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando included Florida Governor Jeb Bush (center). At left is Sam Mallikarjunan from Rockledge High School, and at right is Stephanie Alphonso from Freedom High School in Orlando. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  16. KSC-06pd0463

    NASA Image and Video Library

    2006-03-10

    KENNEDY SPACE CENTER, FLA. - During opening ceremonies of the 2006 FIRST Robotics Regional Competition held March 9-11 at the University of Central Florida in Orlando, Florida Governor Jeb Bush receives the inaugural Governor's Award trophy from Sam Mallikarjunan from Rockledge High School and Stephanie Alphonso from Freedom High School in Orlando. The FIRST Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions. FIRST, which is based on "For Inspiration and Recognition of Science and Technology," redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. NASA and the University of Central Florida are co-sponsors of the regional event, which this year included more than 50 teams. Photo credit: NASA/Kim Shiflett

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zoeller, William; Slattery, Matt; Grab, Joanna

    In 2009, Mass Development issued a RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A). This report describes the development of high performance, affordable, and replicable designs developed by the team inmore » test homes and plans to move forward with the next buildings.« less

  18. A self-referential HOWTO on release engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galassi, Mark C.

    Release engineering is a fundamental part of the software development cycle: it is the point at which quality control is exercised and bug fixes are integrated. The way in which software is released also gives the end user her first experience of a software package, while in scientific computing release engineering can guarantee reproducibility. For these reasons and others, the release process is a good indicator of the maturity and organization of a development team. Software teams often do not put in place a release process at the beginning. This is unfortunate because the team does not have early andmore » continuous execution of test suites, and it does not exercise the software in the same conditions as the end users. I describe an approach to release engineering based on the software tools developed and used by the GNU project, together with several specific proposals related to packaging and distribution. I do this in a step-by-step manner, demonstrating how this very paper is written and built using proper release engineering methods. Because many aspects of release engineering are not exercised in the building of the paper, the accompanying software repository also contains examples of software libraries.« less

  19. Face Time: Educating Face Transplant Candidates

    PubMed Central

    Lamparello, Brooke M.; Bueno, Ericka M.; Diaz-Siso, Jesus Rodrigo; Sisk, Geoffroy C.; Pomahac, Bohdan

    2013-01-01

    Objective: Face transplantation is the innovative application of microsurgery and immunology to restore appearance and function to those with severe facial disfigurements. Our group aims to establish a multidisciplinary education program that can facilitate informed consent and build a strong knowledge base in patients to enhance adherence to medication regimes, recovery, and quality of life. Methods: We analyzed handbooks from our institution's solid organ transplant programs to identify topics applicable to face transplant patients. The team identified unique features of face transplantation that warrant comprehensive patient education. Results: We created a 181-page handbook to provide subjects interested in pursuing transplantation with a written source of information on the process and team members and to address concerns they may have. While the handbook covers a wide range of topics, it is easy to understand and visually appealing. Conclusions: Face transplantation has many unique aspects that must be relayed to the patients pursuing this novel therapy. Since candidates lack third-party support groups and programs, the transplant team must provide an extensive educational component to enhance this complex process. Practice Implications: As face transplantation continues to develop, programs must create sound education programs that address patients’ needs and concerns to facilitate optimal care. PMID:23861990

  20. Face time: educating face transplant candidates.

    PubMed

    Lamparello, Brooke M; Bueno, Ericka M; Diaz-Siso, Jesus Rodrigo; Sisk, Geoffroy C; Pomahac, Bohdan

    2013-01-01

    Face transplantation is the innovative application of microsurgery and immunology to restore appearance and function to those with severe facial disfigurements. Our group aims to establish a multidisciplinary education program that can facilitate informed consent and build a strong knowledge base in patients to enhance adherence to medication regimes, recovery, and quality of life. We analyzed handbooks from our institution's solid organ transplant programs to identify topics applicable to face transplant patients. The team identified unique features of face transplantation that warrant comprehensive patient education. We created a 181-page handbook to provide subjects interested in pursuing transplantation with a written source of information on the process and team members and to address concerns they may have. While the handbook covers a wide range of topics, it is easy to understand and visually appealing. Face transplantation has many unique aspects that must be relayed to the patients pursuing this novel therapy. Since candidates lack third-party support groups and programs, the transplant team must provide an extensive educational component to enhance this complex process. As face transplantation continues to develop, programs must create sound education programs that address patients' needs and concerns to facilitate optimal care.

  1. Team West Virginia/Rome Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Korakakis, Dimitris

    Overall, the team, West Virginia University (WVU) and University of Rome Tor Vergata (UTV), has a goal of building an attractive, low-cost, energy-efficient solar-powered home that represents both the West Virginian and Italian cultures.

  2. 15 CFR 270.321 - Entry and inspection of property where building components, materials, artifacts, and records...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence; Information Created Pursuant to...

  3. 15 CFR 270.321 - Entry and inspection of property where building components, materials, artifacts, and records...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence; Information Created Pursuant to...

  4. 15 CFR 270.321 - Entry and inspection of property where building components, materials, artifacts, and records...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence; Information Created Pursuant to...

  5. 15 CFR 270.321 - Entry and inspection of property where building components, materials, artifacts, and records...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence; Information Created Pursuant to...

  6. 15 CFR 270.321 - Entry and inspection of property where building components, materials, artifacts, and records...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence; Information Created Pursuant to...

  7. A Brief History of Knowledge Building

    ERIC Educational Resources Information Center

    Scardamalia, Marlene; Bereiter, Carl

    2010-01-01

    Knowledge Building as a theoretical, pedagogical, and technological innovation focuses on the 21st century need to work creatively with knowledge. The team now advancing Knowledge Building spans multiple disciplines, sectors, and cultural contexts. Several teacher-researcher-government partnerships have formed to bring about the systemic changes…

  8. Technology Solutions Case Study: Retrofit Measures for Embedded Wood Members in Insulated Mass Masonry Walls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Ueno

    2015-10-01

    In this project, the Building Science Corporation team studied a historic brick building in Lawrence, Massachusetts, which is being renovated into 10 condominium units and adding insulation to the interior side of walls of such masonry buildings.

  9. Scott Horowitz | NREL

    Science.gov Websites

    area, which includes work on whole building energy modeling, cost-based optimization, model accuracy optimization tool used to provide support for the Building America program's teams and energy efficiency goals Colorado graduate student exploring enhancements to building optimization in terms of robustness and speed

  10. What influences palliative care nurses in their choice to engage in or decline clinical supervision?

    PubMed

    Puffett, Nick; Perkins, Paul

    2017-11-02

    Clinical supervision (CS) has been around since the early 1990s in the UK and has been endorsed by government and professional bodies. Levels of engagement range from 18% to 85%. To investigate what influences palliative care nurses in their choice to engage in or decline clinical supervision. A qualitative study was undertaken in an inpatient hospice in England and employed two focus groups to compare the views of participants and non-participants in CS. Data were audio recorded and transcribed verbatim by the researchers and analysed using systematic text condensation. Palliative care nurses all used informal team support for 'in the moment' support. Some engaged in formal CS to reflect 'on action' and to challenge practice. Nurses reported a lack of clarity regarding CS but, once this was overcome and engagement with CS was established, it led to changes in practice, identification of training needs and team building. The option of choice between group and individual supervision was found to be important. Group supervision led to enhanced understanding of group members which also led to team building, individual sessions were useful for individual issues. Protected time was essential for staff to be able to engage in CS. Staff who worked in larger teams reported higher levels of engagement, whereas a small team reported less need due to more informal team support. These findings are positive as they illuminate the importance of choice for support. Nurses need to be aware of their options for support and ultimately how this support affects the care they provide. The Palliative Care Nurse's Model of Support was developed, which shows the effects of each choice and how this may lead to team-building.

  11. Using Science and Much More to Beat the Flood

    ERIC Educational Resources Information Center

    Seeley, Claire

    2014-01-01

    The Beat the Flood challenge involves designing and building a model flood-proof home, which is then tested in "flood" conditions. It is set on the fictitious Watu Island. The children form teams, with each team member being assigned a responsibility for the duration of the task--team leader, chief recorder, and resource manager. This…

  12. Forecasting Periodic Trends: A Semester-Long Team Exercise for Nonscience Majors

    ERIC Educational Resources Information Center

    Tierney, John

    2008-01-01

    Team learning is an effective means of teaching that can contribute toward increased student interest. This article describes a team learning exercise developed for a course for nonscience majors. Students are randomly assigned numbers (atomic numbers) the first day of class. Each student builds a portfolio of information for their element. In the…

  13. The Complete Toolkit for Building High-Performance Work Teams.

    ERIC Educational Resources Information Center

    Golden, Nancy; Gall, Joyce P.

    This workbook is designed for leaders and members of work teams in educational and social-service systems. It presents in a systematic fashion a set of tested facilitation tools that will allow teams to work more efficiently and harmoniously, enabling them to achieve their goals, to deal directly with both personal and work-related issues that…

  14. Peer Evaluation in Blended Team Project-Based Learning: What Do Students Find Important?

    ERIC Educational Resources Information Center

    Lee, Hye-Jung; Lim, Cheolil

    2012-01-01

    Team project-based learning is reputed to be an appropriate way to activate interactions among students and to encourage knowledge building through collaborative learning. Peer evaluation is an effective way for each student to participate actively in a team project. This article investigates the issues that are important to students when…

  15. Creation of Exercises for Team-Based Learning in Business

    ERIC Educational Resources Information Center

    Timmerman, John E.; Morris, R. Franklin, Jr.

    2015-01-01

    Team-based learning (TBL) is an approach that builds on both the case method and problem-based learning and has been widely adopted in the sciences and healthcare disciplines. In recent years business disciplines have also discovered the value of this approach. One of the key characteristics of the team-based learning approach consists of…

  16. New Whole-House Solutions Case Study: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes - Pacific Northwest

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-05-01

    This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measuresmore » from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.« less

  17. Home care aide retention: building team spirit to avoid employee walkouts.

    PubMed

    Walter, B M

    1996-08-01

    While home care agencies work to increase productivity and decrease costs, it is easy to lose sight of the value of employees. Because home care aides are seldom in the office, their value to the organization may get overlooked. In this article, one home care agency shares ways to build team spirit among the home care aides and empower them to be better employees. The result has been increased productivity, improved morale, and a more stable workforce.

  18. Industrialised Building Systems Educational Objectives and the Problem of Change. Programme on Educational Building 5.

    ERIC Educational Resources Information Center

    Phillips, C. W.; Oddie, G. B.

    In 1972, the author was asked to join a small team of experts to help implement one of the activities underway in the Programme on Educational Building (PEB). The activity was entitled, "Industrialised Building Methods for Educational Purposes," and its major objective was to identify for policymakers the considerations involved in using…

  19. 78 FR 69650 - North Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... the North Pacific Fishery Management Council's Scallop Plan Team. SUMMARY: The Scallop Plan Team (SPT... teleconference will be held at the Old Federal Building, 605 W 4th Avenue, Room 205, Anchorage, AK. Council...

  20. KSC-07pd0610

    NASA Image and Video Library

    2007-03-09

    KENNEDY SPACE CENTER, FLA. -- Student competitors listen to game rules before the FIRST robotics event held at the University of Central Florida Arena March 8-10. The FIRST, or For Inspiration and Recognition of Science and Technology, Robotics Competition challenges teams of young people and their mentors to solve a common problem in a six-week timeframe using a standard "kit of parts" and a common set of rules. Teams build robots from the parts and enter them in a series of competitions designed by FIRST founder Dean Kamen and Dr. Woodie Flowers, chairman and vice chairman of the Executive Advisory Board respectively, and a committee of engineers and other professionals. FIRST redefines winning for these students. Teams are rewarded for excellence in design, demonstrated team spirit, gracious professionalism and maturity, and ability to overcome obstacles. Scoring the most points is a secondary goal. Winning means building partnerships that last. Photo credit: NASA/Kim Shiflett

Top