Sample records for technical challenges required

  1. Supersonics Project: Airport Noise Technical Challenge

    NASA Technical Reports Server (NTRS)

    Bridges, James E.

    2008-01-01

    This presentation gives an overview of the work being done under the Airport Noise Technical Challenge portion of the Supersonics Project in the Fundamental Aeronautics Program. The objective of the Challenge is to provide technology (e.g. low noise nozzle concepts) and engineering tools required for a viable supersonic aircraft. To accomplish this we have activities divided into Prediction, Diagnostics, and Engineering elements. Each of the tasks reviewed here have potential applications to work being done at other flight regimes and other aircraft and are of interest to the Acoustics Technical Working Group.

  2. A Perkins Challenge: Assessing Technical Skills in CTE

    ERIC Educational Resources Information Center

    Stone, James R., III

    2009-01-01

    Federal law requires state to develop performance measures and data-collection systems for secondary and postsecondary technical-skill attainment. This poses many challenges, such as defining a technical skills, measurement and when to assess students. In this article, the author outlines various assessment models and looks at the challenges…

  3. HNSciCloud - Overview and technical Challenges

    NASA Astrophysics Data System (ADS)

    Gasthuber, Martin; Meinhard, Helge; Jones, Robert

    2017-10-01

    HEP is only one of many sciences with sharply increasing compute requirements that cannot be met by profiting from Moore’s law alone. Commercial clouds potentially allow for realising larger economies of scale. While some small-scale experience requiring dedicated effort has been collected, public cloud resources have not been integrated yet with the standard workflows of science organisations in their private data centres; in addition, European science has not ramped up to significant scale yet. The HELIX NEBULA Science Cloud project - HNSciCloud, partly funded by the European Commission, addresses these points. Ten organisations under CERN’s leadership, covering particle physics, bioinformatics, photon science and other sciences, have joined to procure public cloud resources as well as dedicated development efforts towards this integration. The HNSciCloud project faces the challenge to accelerate developments performed by the selected commercial providers. In order to guarantee cost efficient usage of IaaS resources across a wide range of scientific communities, the technical requirements had to be carefully constructed. With respect to current IaaS offerings, dataintensive science is the biggest challenge; other points that need to be addressed concern identity federations, network connectivity and how to match business practices of large IaaS providers with those of public research organisations. In the first section, this paper will give an overview of the project and explain the findings so far. The last section will explain the key points of the technical requirements and present first results of the experience of the procurers with the services in comparison to their’on-premise’ infrastructure.

  4. Vocational and Technical Education in Lebanon: Strategic Issues and Challenges

    ERIC Educational Resources Information Center

    Karam, Gebran

    2006-01-01

    The current status of the Lebanese vocational and technical education (VTE) system is assessed and the strategic issues and challenges facing it are identified. In addition to the economic and social challenges that are common to many developing countries, the Lebanese system suffers from idiosyncratic problems, which may require innovative and…

  5. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  6. Planetary Protection Technologies: Technical Challenges for Mars Exploration

    NASA Technical Reports Server (NTRS)

    Buxbaum, Karen L.

    2005-01-01

    The search for life in the solar system, using either in situ analysis or sample return, brings with it special technical challenges in the area of planetary protection. Planetary protection (PP) requires planetary explorers to preserve biological and organic conditions for future exploration and to protect the Earth from potential extraterrestrial contamination that could occur as a result of sample return to the Earth-Moon system. In view of the exploration plans before us, the NASA Solar System Exploration Program Roadmap published in May 2003 identified planetary protection as one of 13 technologies for "high priority technology investments." Recent discoveries at Mars and Jupiter, coupled with new policies, have made this planning for planetary protection technology particularly challenging and relevant.New missions to Mars have been formulated, which present significantly greater forward contamination potential. New policies, including the introduction by COSPAR of a Category IVc for planetary protection, have been adopted by COSPAR in response. Some missions may not be feasible without the introduction of new planetary protection technologies. Other missions may be technically possible but planetary protection requirements may be so costly to implement with current technology that they are not affordable. A strategic investment strategy will be needed to focus on technology investments designed to enable future missions and reduce the costs of future missions. This presentation will describe some of the potential technological pathways that may be most protective.

  7. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  8. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  9. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  10. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  11. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  12. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2010-01-01 2010-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  13. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2011-01-01 2011-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  14. 47 CFR 80.659 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements. 80.659 Section 80.659 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Maritime Support Stations § 80.659 Technical requirements. The authorized frequency...

  15. 30 CFR 7.404 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Technical requirements. 7.404 Section 7.404 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND... Cable Splice Kits § 7.404 Technical requirements. (a) Electric cables and splices shall be flame...

  16. Crowdsourcing for Challenging Technical Problems - It Works!

    NASA Technical Reports Server (NTRS)

    Davis, Jeffrey R.

    2011-01-01

    The NASA Johnson Space Center Space Life Sciences Directorate (SLSD) and Wyle Integrated Science and Engineering (Wyle) will conduct a one-day business cluster at the 62nd IAC so that IAC attendees will understand the benefits of open innovation (crowdsourcing), review successful results of conducting technical challenges in various open innovation projects, and learn how an organization can effectively deploy these new problem solving tools to innovate more efficiently and effectively. Results from both the SLSD open innovation pilot program and the open innovation workshop conducted by the NASA Human Health and Performance Center will be discussed. NHHPC members will be recruited to participate in the business cluster (see membership http://nhhpc.nasa.gov) and as IAF members. Crowdsourcing may be defined as the act of outsourcing tasks that are traditionally performed by an employee or contractor to an undefined, generally large group of people or community (a crowd) in the form of an open call. The open call may be issued by the organization wishing to find a solution to a particular problem or complete a task, or by an open innovation service provider on behalf of that organization. In 2008, the SLSD, with the support of Wyle, established and implemented pilot projects in open innovation (crowdsourcing) to determine if these new internet-based platforms could indeed find solutions to difficult technical challenges. These unsolved technical problems were converted to problem statements, called Challenges by some open innovation service providers, and were then posted externally to seek solutions to these problems. In addition, an open call was issued internally to NASA employees Agency wide (11 Field Centers and NASA HQ) using an open innovation service provider crowdsourcing platform to post NASA challenges from each Center for the others to propose solutions). From 2008 to 2010, the SLSD issued 34 challenges, 14 externally and 20 internally. The 14 external

  17. Comparison of Traditional and Innovative Techniques to Solve Technical Challenges

    NASA Technical Reports Server (NTRS)

    Perchonok, Michele

    2011-01-01

    This slide presentation reviews the use of traditional and innovative techniques to solve technical challenges in food storage technology. The planning for a mission to Mars is underway, and the food storage technology improvements requires that improvements be made. This new technology is required, because current food storage technology is inadequate,refrigerators or freezers are not available for food preservation, and that a shelf life of 5 years is expected. A 10 year effort to improve food packaging technology has not enhanced significantly food packaging capabilities. Two innovation techniques were attempted InnoCentive and Yet2.com and have provided good results, and are still under due diligence for solver verification.

  18. 47 CFR 15.15 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.15 Section 15.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES General § 15.15 General technical requirements. (a) An intentional or unintentional radiator shall be...

  19. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  20. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  1. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  2. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  3. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  4. Technical parameters for specifying imagery requirements

    NASA Technical Reports Server (NTRS)

    Coan, Paul P.; Dunnette, Sheri J.

    1994-01-01

    Providing visual information acquired from remote events to various operators, researchers, and practitioners has become progressively more important as the application of special skills in alien or hazardous situations increases. To provide an understanding of the technical parameters required to specify imagery, we have identified, defined, and discussed seven salient characteristics of images: spatial resolution, linearity, luminance resolution, spectral discrimination, temporal discrimination, edge definition, and signal-to-noise ratio. We then describe a generalizing imaging system and identified how various parts of the system affect the image data. To emphasize the different applications of imagery, we have constrasted the common television system with the significant parameters of a televisual imaging system for technical applications. Finally, we have established a method by which the required visual information can be specified by describing certain technical parameters which are directly related to the information content of the imagery. This method requires the user to complete a form listing all pertinent data requirements for the imagery.

  5. 40 CFR 58.11 - Network technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...

  6. 40 CFR 58.11 - Network technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...

  7. Crowd Sourcing for Challenging Technical Problems and Business Model

    NASA Technical Reports Server (NTRS)

    Davis, Jeffrey R.; Richard, Elizabeth

    2011-01-01

    Crowd sourcing may be defined as the act of outsourcing tasks that are traditionally performed by an employee or contractor to an undefined, generally large group of people or community (a crowd) in the form of an open call. The open call may be issued by an organization wishing to find a solution to a particular problem or complete a task, or by an open innovation service provider on behalf of that organization. In 2008, the Space Life Sciences Directorate (SLSD), with the support of Wyle Integrated Science and Engineering, established and implemented pilot projects in open innovation (crowd sourcing) to determine if these new internet-based platforms could indeed find solutions to difficult technical challenges. These unsolved technical problems were converted to problem statements, also called "Challenges" or "Technical Needs" by the various open innovation service providers, and were then posted externally to seek solutions. In addition, an open call was issued internally to NASA employees Agency wide (10 Field Centers and NASA HQ) using an open innovation service provider crowd sourcing platform to post NASA challenges from each Center for the others to propose solutions). From 2008 to 2010, the SLSD issued 34 challenges, 14 externally and 20 internally. The 14 external problems or challenges were posted through three different vendors: InnoCentive, Yet2.com and TopCoder. The 20 internal challenges were conducted using the InnoCentive crowd sourcing platform designed for internal use by an organization. This platform was customized for NASA use and promoted as NASA@Work. The results were significant. Of the seven InnoCentive external challenges, two full and five partial awards were made in complex technical areas such as predicting solar flares and long-duration food packaging. Similarly, the TopCoder challenge yielded an optimization algorithm for designing a lunar medical kit. The Yet2.com challenges yielded many new industry and academic contacts in bone

  8. Technical challenges involved in supporting the Lambda Point Experiment

    NASA Technical Reports Server (NTRS)

    Petrac, D.; Israelsson, U.; Otth, D.; Simmons, L.; Staats, J.; Thompson, A.

    1990-01-01

    The Lambda Point Experiment (LPE) is one of the instruments included in the U.S. Microgravity Payload Mission 1 planned for one of the Space Shuttle flights in 1992. The objective of the experiment is to measure the heat capacity of liquid helium within a narrow interval around the transition between superfluid and normal helium (the lambda point) with an unprecedented temperature resolution of about 10 to the -10th. Multiple technical challenges are presented in the areas of structural support, safety analysis, and modal frequency tests. This paper describes the technical challenges of JPL's multidisciplinary involvement in support of these experiments in microgravity.

  9. Managing Information On Technical Requirements

    NASA Technical Reports Server (NTRS)

    Mauldin, Lemuel E., III; Hammond, Dana P.

    1993-01-01

    Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

  10. Technical requirements for bioassay support services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hickman, D.P.; Anderson, A.L.

    1991-05-01

    This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) bioassay program. It includes information and details that can be used as a model in providing technical contents and requirements for bioassay laboratory support, either internally or in solicitations by Geotech to obtain subcontractor laboratory support. It provides a detailed summary and description of the types of bioassay samples to be expected in support of Geotech remedial projects for the US Department of Energy and the bioassay services and analytical requirements necessary to process such samples, including required limits of sensitivity. General responsibilities of the bioassay laboratory are alsomore » addressed, including quality assurance. Peripheral information of importance to the program is included in the appendices of this document. 7 tabs.« less

  11. Sonic Boom Modeling Technical Challenge

    NASA Technical Reports Server (NTRS)

    Sullivan, Brenda M.

    2007-01-01

    This viewgraph presentation reviews the technical challenges in modeling sonic booms. The goal of this program is to develop knowledge, capabilities and technologies to enable overland supersonic flight. The specific objectives of the modeling are: (1) Develop and validate sonic boom propagation model through realistic atmospheres, including effects of turbulence (2) Develop methods enabling prediction of response of and acoustic transmission into structures impacted by sonic booms (3) Develop and validate psychoacoustic model of human response to sonic booms under both indoor and outdoor listening conditions, using simulators.

  12. Technical Challenges of Enterprise Imaging: HIMSS-SIIM Collaborative White Paper.

    PubMed

    Clunie, David A; Dennison, Don K; Cram, Dawn; Persons, Kenneth R; Bronkalla, Mark D; Primo, Henri Rik

    2016-10-01

    This white paper explores the technical challenges and solutions for acquiring (capturing) and managing enterprise images, particularly those involving visible light applications. The types of acquisition devices used for various general-purpose photography and specialized applications including dermatology, endoscopy, and anatomic pathology are reviewed. The formats and standards used, and the associated metadata requirements and communication protocols for transfer and workflow are considered. Particular emphasis is placed on the importance of metadata capture in both order- and encounter-based workflow. The benefits of using DICOM to provide a standard means of recording and accessing both metadata and image and video data are considered, as is the role of IHE and FHIR.

  13. Reaching a 1.5°C target: socio-technical challenges for a rapid transition to low-carbon electricity systems.

    PubMed

    Eyre, Nick; Darby, Sarah J; Grünewald, Philipp; McKenna, Eoghan; Ford, Rebecca

    2018-05-13

    A 1.5°C global average target implies that we should no longer focus on merely incremental emissions reductions from the electricity system, but rather on fundamentally re-envisaging a system that, sooner rather than later, becomes carbon free. Many low-carbon technologies are surpassing mainstream predictions for both uptake and cost reduction. Their deployment is beginning to be disruptive within established systems. 'Smart technologies' are being developed to address emerging challenges of system integration, but their rates of future deployment remain uncertain. We argue that transition towards a system that can fully displace carbon generation sources will require expanding the focus of our efforts beyond technical solutions. Recognizing that change has social and technical dimensions, and that these interact strongly, we set out a socio-technical review that covers electricity infrastructure, citizens, business models and governance. It describes some of the socio-technical challenges that need to be addressed for the successful transition of the existing electricity systems. We conclude that a socio-technical understanding of electricity system transitions offers new and better insights into the potential and challenges for rapid decarbonization.This article is part of the theme issue 'The Paris Agreement: understanding the physical and social challenges for a warming world of 1.5°C above pre-industrial levels'. © 2018 The Author(s).

  14. 47 CFR 80.273 - Technical requirements for radar equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...

  15. 47 CFR 80.273 - Technical requirements for radar equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...

  16. Technical solutions to nonproliferation challenges

    NASA Astrophysics Data System (ADS)

    Satkowiak, Lawrence

    2014-05-01

    The threat of nuclear terrorism is real and poses a significant challenge to both U.S. and global security. For terrorists, the challenge is not so much the actual design of an improvised nuclear device (IND) but more the acquisition of the special nuclear material (SNM), either highly enriched uranium (HEU) or plutonium, to make the fission weapon. This paper provides two examples of technical solutions that were developed in support of the nonproliferation objective of reducing the opportunity for acquisition of HEU. The first example reviews technologies used to monitor centrifuge enrichment plants to determine if there is any diversion of uranium materials or misuse of facilities to produce undeclared product. The discussion begins with a brief overview of the basics of uranium processing and enrichment. The role of the International Atomic Energy Agency (IAEA), its safeguard objectives and how the technology evolved to meet those objectives will be described. The second example focuses on technologies developed and deployed to monitor the blend down of 500 metric tons of HEU from Russia's dismantled nuclear weapons to reactor fuel or low enriched uranium (LEU) under the U.S.-Russia HEU Purchase Agreement. This reactor fuel was then purchased by U.S. fuel fabricators and provided about half the fuel for the domestic power reactors. The Department of Energy established the HEU Transparency Program to provide confidence that weapons usable HEU was being blended down and thus removed from any potential theft scenario. Two measurement technologies, an enrichment meter and a flow monitor, were combined into an automated blend down monitoring system (BDMS) and were deployed to four sites in Russia to provide 24/7 monitoring of the blend down. Data was downloaded and analyzed periodically by inspectors to provide the assurances required.

  17. Technical solutions to nonproliferation challenges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Satkowiak, Lawrence

    2014-05-09

    The threat of nuclear terrorism is real and poses a significant challenge to both U.S. and global security. For terrorists, the challenge is not so much the actual design of an improvised nuclear device (IND) but more the acquisition of the special nuclear material (SNM), either highly enriched uranium (HEU) or plutonium, to make the fission weapon. This paper provides two examples of technical solutions that were developed in support of the nonproliferation objective of reducing the opportunity for acquisition of HEU. The first example reviews technologies used to monitor centrifuge enrichment plants to determine if there is any diversionmore » of uranium materials or misuse of facilities to produce undeclared product. The discussion begins with a brief overview of the basics of uranium processing and enrichment. The role of the International Atomic Energy Agency (IAEA), its safeguard objectives and how the technology evolved to meet those objectives will be described. The second example focuses on technologies developed and deployed to monitor the blend down of 500 metric tons of HEU from Russia's dismantled nuclear weapons to reactor fuel or low enriched uranium (LEU) under the U.S.-Russia HEU Purchase Agreement. This reactor fuel was then purchased by U.S. fuel fabricators and provided about half the fuel for the domestic power reactors. The Department of Energy established the HEU Transparency Program to provide confidence that weapons usable HEU was being blended down and thus removed from any potential theft scenario. Two measurement technologies, an enrichment meter and a flow monitor, were combined into an automated blend down monitoring system (BDMS) and were deployed to four sites in Russia to provide 24/7 monitoring of the blend down. Data was downloaded and analyzed periodically by inspectors to provide the assurances required.« less

  18. Digital media in the home: technical and research challenges

    NASA Astrophysics Data System (ADS)

    Ribas-Corbera, Jordi

    2005-03-01

    This article attempts to identify some of the technology and research challenges facing the digital media industry in the future. We first discuss several trends in the industry, such as the rapid growth of broadband Internet networks and the emergence of networking and media-capable devices in the home. Next, we present technical challenges that result from these trends, such as effective media interoperability in devices, and provide a brief overview of Windows Media, which is one of the technologies in the market attempting to address these challenges. Finally, given these trends and the state of the art, we argue that further research on data compression, encoder optimization, and multi-format transcoding can potentially make a significant technical and business impact in digital media. We also explore the reasons that research on related techniques such as wavelets or scalable video coding is having a relatively minor impact in today"s practical digital media systems.

  19. Technical Excellence: A Requirement for Good Engineering

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2008-01-01

    Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.

  20. Career and Technical Education Administration: Requirements, Certification/Licensure, and Preparation

    ERIC Educational Resources Information Center

    Zirkle, Christopher J.; Jeffery, Jeremy O.

    2017-01-01

    The current climate of career and technical administration requirements in all 50 states was detailed and explored. An increasing number of states are not requiring specific career-technical administration certification/licensure in order to oversee secondary career and technical education (CTE) programs, with more states moving towards a general…

  1. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  2. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  3. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  4. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  5. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  6. Health Recommender Systems: Concepts, Requirements, Technical Basics and Challenges

    PubMed Central

    Wiesner, Martin; Pfeifer, Daniel

    2014-01-01

    During the last decades huge amounts of data have been collected in clinical databases representing patients' health states (e.g., as laboratory results, treatment plans, medical reports). Hence, digital information available for patient-oriented decision making has increased drastically but is often scattered across different sites. As as solution, personal health record systems (PHRS) are meant to centralize an individual's health data and to allow access for the owner as well as for authorized health professionals. Yet, expert-oriented language, complex interrelations of medical facts and information overload in general pose major obstacles for patients to understand their own record and to draw adequate conclusions. In this context, recommender systems may supply patients with additional laymen-friendly information helping to better comprehend their health status as represented by their record. However, such systems must be adapted to cope with the specific requirements in the health domain in order to deliver highly relevant information for patients. They are referred to as health recommender systems (HRS). In this article we give an introduction to health recommender systems and explain why they are a useful enhancement to PHR solutions. Basic concepts and scenarios are discussed and a first implementation is presented. In addition, we outline an evaluation approach for such a system, which is supported by medical experts. The construction of a test collection for case-related recommendations is described. Finally, challenges and open issues are discussed. PMID:24595212

  7. Technical challenges in the construction of the steady-state stellarator Wendelstein 7-X

    NASA Astrophysics Data System (ADS)

    Bosch, H.-S.; Wolf, R. C.; Andreeva, T.; Baldzuhn, J.; Birus, D.; Bluhm, T.; Bräuer, T.; Braune, H.; Bykov, V.; Cardella, A.; Durodié, F.; Endler, M.; Erckmann, V.; Gantenbein, G.; Hartmann, D.; Hathiramani, D.; Heimann, P.; Heinemann, B.; Hennig, C.; Hirsch, M.; Holtum, D.; Jagielski, J.; Jelonnek, J.; Kasparek, W.; Klinger, T.; König, R.; Kornejew, P.; Kroiss, H.; Krom, J. G.; Kühner, G.; Laqua, H.; Laqua, H. P.; Lechte, C.; Lewerentz, M.; Maier, J.; McNeely, P.; Messiaen, A.; Michel, G.; Ongena, J.; Peacock, A.; Pedersen, T. S.; Riedl, R.; Riemann, H.; Rong, P.; Rust, N.; Schacht, J.; Schauer, F.; Schroeder, R.; Schweer, B.; Spring, A.; Stäbler, A.; Thumm, M.; Turkin, Y.; Wegener, L.; Werner, A.; Zhang, D.; Zilker, M.; Akijama, T.; Alzbutas, R.; Ascasibar, E.; Balden, M.; Banduch, M.; Baylard, Ch.; Behr, W.; Beidler, C.; Benndorf, A.; Bergmann, T.; Biedermann, C.; Bieg, B.; Biel, W.; Borchardt, M.; Borowitz, G.; Borsuk, V.; Bozhenkov, S.; Brakel, R.; Brand, H.; Brown, T.; Brucker, B.; Burhenn, R.; Buscher, K.-P.; Caldwell-Nichols, C.; Cappa, A.; Cardella, A.; Carls, A.; Carvalho, P.; Ciupiński, Ł.; Cole, M.; Collienne, J.; Czarnecka, A.; Czymek, G.; Dammertz, G.; Dhard, C. P.; Davydenko, V. I.; Dinklage, A.; Drevlak, M.; Drotziger, S.; Dudek, A.; Dumortier, P.; Dundulis, G.; Eeten, P. v.; Egorov, K.; Estrada, T.; Faugel, H.; Fellinger, J.; Feng, Y.; Fernandes, H.; Fietz, W. H.; Figacz, W.; Fischer, F.; Fontdecaba, J.; Freund, A.; Funaba, T.; Fünfgelder, H.; Galkowski, A.; Gates, D.; Giannone, L.; García Regaña, J. M.; Geiger, J.; Geißler, S.; Greuner, H.; Grahl, M.; Groß, S.; Grosman, A.; Grote, H.; Grulke, O.; Haas, M.; Haiduk, L.; Hartfuß, H.-J.; Harris, J. H.; Haus, D.; Hein, B.; Heitzenroeder, P.; Helander, P.; Heller, R.; Hidalgo, C.; Hildebrandt, D.; Höhnle, H.; Holtz, A.; Holzhauer, E.; Holzthüm, R.; Huber, A.; Hunger, H.; Hurd, F.; Ihrke, M.; Illy, S.; Ivanov, A.; Jablonski, S.; Jaksic, N.; Jakubowski, M.; Jaspers, R.; Jensen, H.; Jenzsch, H.; Kacmarczyk, J.; Kaliatk, T.; Kallmeyer, J.; Kamionka, U.; Karaleviciu, R.; Kern, S.; Keunecke, M.; Kleiber, R.; Knauer, J.; Koch, R.; Kocsis, G.; Könies, A.; Köppen, M.; Koslowski, R.; Koshurinov, J.; Krämer-Flecken, A.; Krampitz, R.; Kravtsov, Y.; Krychowiak, M.; Krzesinski, G.; Ksiazek, I.; Kubkowska, M.; Kus, A.; Langish, S.; Laube, R.; Laux, M.; Lazerson, S.; Lennartz, M.; Li, C.; Lietzow, R.; Lohs, A.; Lorenz, A.; Louche, F.; Lubyako, L.; Lumsdaine, A.; Lyssoivan, A.; Maaßberg, H.; Marek, P.; Martens, C.; Marushchenko, N.; Mayer, M.; Mendelevitch, B.; Mertens, Ph.; Mikkelsen, D.; Mishchenko, A.; Missal, B.; Mizuuchi, T.; Modrow, H.; Mönnich, T.; Morizaki, T.; Murakami, S.; Musielok, F.; Nagel, M.; Naujoks, D.; Neilson, H.; Neubauer, O.; Neuner, U.; Nocentini, R.; Noterdaeme, J.-M.; Nührenberg, C.; Obermayer, S.; Offermanns, G.; Oosterbeek, H.; Otte, M.; Panin, A.; Pap, M.; Paquay, S.; Pasch, E.; Peng, X.; Petrov, S.; Pilopp, D.; Pirsch, H.; Plaum, B.; Pompon, F.; Povilaitis, M.; Preinhaelter, J.; Prinz, O.; Purps, F.; Rajna, T.; Récsei, S.; Reiman, A.; Reiter, D.; Remmel, J.; Renard, S.; Rhode, V.; Riemann, J.; Rimkevicius, S.; Riße, K.; Rodatos, A.; Rodin, I.; Romé, M.; Roscher, H.-J.; Rummel, K.; Rummel, Th.; Runov, A.; Ryc, L.; Sachtleben, J.; Samartsev, A.; Sanchez, M.; Sano, F.; Scarabosio, A.; Schmid, M.; Schmitz, H.; Schmitz, O.; Schneider, M.; Schneider, W.; Scheibl, L.; Scholz, M.; Schröder, G.; Schröder, M.; Schruff, J.; Schumacher, H.; Shikhovtsev, I. V.; Shoji, M.; Siegl, G.; Skodzik, J.; Smirnow, M.; Speth, E.; Spong, D. A.; Stadler, R.; Sulek, Z.; Szabó, V.; Szabolics, T.; Szetefi, T.; Szökefalvi-Nagy, Z.; Tereshchenko, A.; Thomsen, H.; Thumm, M.; Timmermann, D.; Tittes, H.; Toi, K.; Tournianski, M.; Toussaint, U. v.; Tretter, J.; Tulipán, S.; Turba, P.; Uhlemann, R.; Urban, J.; Urbonavicius, E.; Urlings, P.; Valet, S.; Van Eester, D.; Van Schoor, M.; Vervier, M.; Viebke, H.; Vilbrandt, R.; Vrancken, M.; Wauters, T.; Weissgerber, M.; Weiß, E.; Weller, A.; Wendorf, J.; Wenzel, U.; Windisch, T.; Winkler, E.; Winkler, M.; Wolowski, J.; Wolters, J.; Wrochna, G.; Xanthopoulos, P.; Yamada, H.; Yokoyama, M.; Zacharias, D.; Zajac, J.; Zangl, G.; Zarnstorff, M.; Zeplien, H.; Zoletnik, S.; Zuin, M.

    2013-12-01

    The next step in the Wendelstein stellarator line is the large superconducting device Wendelstein 7-X, currently under construction in Greifswald, Germany. Steady-state operation is an intrinsic feature of stellarators, and one key element of the Wendelstein 7-X mission is to demonstrate steady-state operation under plasma conditions relevant for a fusion power plant. Steady-state operation of a fusion device, on the one hand, requires the implementation of special technologies, giving rise to technical challenges during the design, fabrication and assembly of such a device. On the other hand, also the physics development of steady-state operation at high plasma performance poses a challenge and careful preparation. The electron cyclotron resonance heating system, diagnostics, experiment control and data acquisition are prepared for plasma operation lasting 30 min. This requires many new technological approaches for plasma heating and diagnostics as well as new concepts for experiment control and data acquisition.

  8. Delivery of high-tech home care by hospital-based nursing units in Quebec: clinical and technical challenges.

    PubMed

    Lehoux, Pascale; Richard, L; Pineault, R; Saint-Arnaud, J

    2006-03-01

    The role that hospital-based nurses should play in the delivery of high-tech home care, and how they should be supported in that role, are topics that remain understudied. Our research objective was to document how hospital-based nursing teams perceive and deal with the clinical and technical challenges associated with the provision of high-tech home care. Four home care interventions were selected: antibiotic intravenous therapy, parenteral nutrition, peritoneal dialysis and oxygen therapy. A self-administered survey was sent to all hospital-based units providing these interventions in the province of Quebec, Canada (n = 154; response rate: 70.8%). We used descriptive statistical analyses to derive mean values for scores on either a five- or a six-level Likert scale. Despite variation across the four interventions, our results indicate that while nursing teams believe these interventions increase patients' autonomy, they also recognize that they generate anxiety and impose constraints on patients' lives. Nurses must increase efforts to deal with both clinical and technical challenges and help patients overcome the barriers to appropriate use of home care technologies. While nursing teams generally perceive high-tech home care as beneficial, they still experience significant technical and clinical challenges. Some of these challenges could be addressed by strengthening professional training initiatives, while others require broader home care policy interventions.

  9. The Challenges of Career and Technical Education Concurrent Enrollment: An Administrative Perspective

    ERIC Educational Resources Information Center

    Haag, Patricia W.

    2015-01-01

    Career and technical education concurrent enrollment may pose unique challenges in programming and enrollment for program administrators, and this chapter describes the experiences and challenges of a CTE concurrent enrollment administrator.

  10. Addressing tomorrow's DMO technical challenges today

    NASA Astrophysics Data System (ADS)

    Milligan, James R.

    2009-05-01

    Distributed Mission Operations (DMO) is essentially a type of networked training that pulls in participants from all the armed services and, increasingly, allies to permit them to "game" and rehearse highly complex campaigns, using a mix of local, distant, and virtual players. The United States Air Force Research Laboratory (AFRL) is pursuing Science and Technology (S&T) solutions to address technical challenges associated with distributed communications and information management as DMO continues to progressively scale up the number, diversity, and geographic dispersal of participants in training and rehearsal exercises.

  11. Design requirements, challenges, and solutions for high-temperature falling particle receivers

    NASA Astrophysics Data System (ADS)

    Christian, Joshua; Ho, Clifford

    2016-05-01

    Falling particle receivers (FPR) utilize small particles as a heat collecting medium within a cavity receiver structure. Previous analysis for FPR systems include computational fluid dynamics (CFD), analytical evaluations, and experiments to determine the feasibility and achievability of this CSP technology. Sandia National Laboratories has fabricated and tested a 1 MWth FPR that consists of a cavity receiver, top hopper, bottom hopper, support structure, particle elevator, flux target, and instrumentation. Design requirements and inherent challenges were addressed to enable continuous operation of flowing particles under high-flux conditions and particle temperatures over 700 °C. Challenges include being able to withstand extremely high temperatures (up to 1200°C on the walls of the cavity), maintaining particle flow and conveyance, measuring temperatures and mass flow rates, filtering out debris, protecting components from direct flux spillage, and measuring irradiance in the cavity. Each of the major components of the system is separated into design requirements, associated challenges and corresponding solutions. The intent is to provide industry and researchers with lessons learned to avoid pitfalls and technical problems encountered during the development of Sandia's prototype particle receiver system at the National Solar Thermal Test Facility (NSTTF).

  12. 47 CFR 15.517 - Technical requirements for indoor UWB systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...

  13. 47 CFR 15.513 - Technical requirements for medical imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for medical imaging systems. 15.513 Section 15.513 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.513 Technical requirements for medical imaging systems. (a) The UWB...

  14. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  15. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  16. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  17. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  18. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  19. SHARP's systems engineering challenge: rectifying integrated product team requirements with performance issues in an evolutionary spiral development acquisition

    NASA Astrophysics Data System (ADS)

    Kuehl, C. Stephen

    2003-08-01

    Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics

  20. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...

  1. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...

  2. 47 CFR 74.861 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Low Power Auxiliary Stations § 74.861 Technical requirements. (a) Transmitter power is the power at the transmitter output terminals and delivered... the purpose of this subpart, the transmitter power is the carrier power. (b) Each authorization for a...

  3. 47 CFR 68.604 - Requirements for submitting technical criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Requirements for submitting technical criteria. 68.604 Section 68.604 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER...) may establish technical criteria for terminal equipment pursuant to ANSI consensus decision-making...

  4. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  5. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  6. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  7. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  8. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  9. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  10. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  11. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  12. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  13. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  14. 30 CFR 7.44 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...

  15. 30 CFR 7.44 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...

  16. Review of PREPA Technical Requirements for Interconnecting Wind and Solar Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gevorgian, Vahan; Booth, Sarah

    2013-11-01

    The Puerto Rico Electric Power Authority developed the minimum technical requirements for interconnection of wind turbine generation and photovoltaic power plants. NREL has conducted a review of these requirements based on generic technical aspects and electrical characteristics of wind and photovoltaic power plants, and on existing requirements from other utilities (both U.S. and European).

  17. Technical challenges for big data in biomedicine and health: data sources, infrastructure, and analytics.

    PubMed

    Peek, N; Holmes, J H; Sun, J

    2014-08-15

    To review technical and methodological challenges for big data research in biomedicine and health. We discuss sources of big datasets, survey infrastructures for big data storage and big data processing, and describe the main challenges that arise when analyzing big data. The life and biomedical sciences are massively contributing to the big data revolution through secondary use of data that were collected during routine care and through new data sources such as social media. Efficient processing of big datasets is typically achieved by distributing computation over a cluster of computers. Data analysts should be aware of pitfalls related to big data such as bias in routine care data and the risk of false-positive findings in high-dimensional datasets. The major challenge for the near future is to transform analytical methods that are used in the biomedical and health domain, to fit the distributed storage and processing model that is required to handle big data, while ensuring confidentiality of the data being analyzed.

  18. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  19. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  20. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  1. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  2. 30 CFR 7.84 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...

  3. South African CSP projects under the REIPPP programme - Requirements, challenges and opportunities

    NASA Astrophysics Data System (ADS)

    Relancio, Javier; Cuellar, Alberto; Walker, Gregg; Ettmayr, Chris

    2016-05-01

    Thus far seven Concentrated Solar Power (CSP) projects have been awarded under the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), totalling 600MW: one project is in operation, four under construction and two on their way to financial close. This provides an excellent opportunity for analysis of key features of the projects that have contributed to or detracted from the programme's success. The paper draws from Mott MacDonald's involvement as Technical Advisor on the seven CSP projects that have been successful under the REIPPPP to date as well as other global CSP developments. It presents how various programme requirements have affected the implementation of projects, such as the technical requirements, time of day tariff structure, economic development requirements and the renewable energy grid code. The increasingly competitive tariffs offered have encouraged developers to investigate efficiency maximising project configurations and cost saving mechanisms, as well as featuring state of the art technology in their proposals. The paper assesses the role of the project participants (developers, lenders and government) with regards to these innovative technologies and solutions. In our paper we discuss the status of projects and the SA market, analysing the main challenges and opportunities that in turn have influenced various aspects such as technology choice, operational regimes and supply chain arrangements.

  4. 44 CFR 65.3 - Requirement to submit new technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... available, a community shall notify the Administrator of the changes by submitting technical or scientific... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's...

  5. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  6. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  7. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  8. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  9. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  10. Turning Technologies into Businesses- The Challenge for the Technical Entrepreneur

    NASA Astrophysics Data System (ADS)

    Glass, Alexander

    2000-03-01

    Over the past twenty-five years, new businesses based on innovative technology have been the driving force for the US economy. Due to the abundance of early-stage capital, each year, thousands of scientists and engineers receive support to start new, technology-based businesses. However, the transition from technologist to entrepreneur is often difficult. It requires a shift in emphasis from a technology focus to a market focus. We shall discuss the challenges facing the technical entrepreneur in launching a new enterprise, and a variety of resources that are available to help the entrepreneur succeed. Many technologists fall victim to the myth that if you ``build a better mousetrap, the world will beat a path to your door." To be sure, it is important to base your business on sound technology that offers a clear advantage over current practice, and, if possible, to secure title to the technology, either by obtaining patent protection, or securing an exclusive license. Once that is done, however, the principal concern of the fledgling enterprise is building a business and obtaining the financial resources to enable it to grow. The entrepreneur must develop a clear and compelling business model, that can be communicated to a non-technical investor in a few minutes. This requires a mode of thinking and expression quite different from that commonly used in engineering or scientific discussions. Fortunately, abundant resources are available to help the technologist become a successful entrepreneur. We shall discuss the kinds of assistance that are generally available through local and national programs, and give specific examples based on the activities of the Bay Area Regional Technology Alliance in northern California.

  11. Mechanistic and Technical Challenges in Studying the Human Microbiome and Cancer Epidemiology.

    PubMed

    Verma, Mukesh

    2017-04-01

    This article reviews the significance of the microbiome in cancer epidemiology, mechanistic and technical challenges in the field, and characterization of the microbiome in different tumor types to identify biomarkers of risk, progression, and prognosis. Publications on the microbiome and cancer epidemiology were reviewed to analyze sample collection and processing, microbiome taxa characterization by 16S ribosomal RNA sequencing, and microbiome metabolite characterization (metabotyping) by nuclear magnetic resonance and mass spectrometry. The analysis identified methodology types, research design, sample types, and issues in integrating data from different platforms. Aerodigestive cancer epidemiology studies conducted by different groups demonstrated the significance of microbiome information in developing approaches to improve health. Challenges exist in sample preparation and processing (eg, standardization of methods for collection and analysis). These challenges relate to technology, data integration from "omics" studies, inherent bias in primer selection during 16S ribosomal RNA sequencing, the need for large consortia with well-characterized biospecimens, cause and effect issues, resilience of microbiota to exposure events (requires longitudinal studies), and expanding studies for fungal and viral diversity (most studies used bacterial 16S ribosomal RNA sequencing for microbiota characterization). Despite these challenges, microbiome and cancer epidemiology studies are significant and may facilitate cancer risk assessment, diagnosis, and prognosis. In the future, clinical trials likely will use microbiota modifications to improve the efficacy of existing treatments.

  12. Mechanistic and Technical Challenges in Studying the Human Microbiome and Cancer Epidemiology

    PubMed Central

    2016-01-01

    This article reviews the significance of the microbiome in cancer epidemiology, mechanistic and technical challenges in the field, and characterization of the microbiome in different tumor types to identify biomarkers of risk, progression, and prognosis. Publications on the microbiome and cancer epidemiology were reviewed to analyze sample collection and processing, microbiome taxa characterization by 16S ribosomal RNA sequencing, and microbiome metabolite characterization (metabotyping) by nuclear magnetic resonance and mass spectrometry. The analysis identified methodology types, research design, sample types, and issues in integrating data from different platforms. Aerodigestive cancer epidemiology studies conducted by different groups demonstrated the significance of microbiome information in developing approaches to improve health. Challenges exist in sample preparation and processing (eg, standardization of methods for collection and analysis). These challenges relate to technology, data integration from “omics” studies, inherent bias in primer selection during 16S ribosomal RNA sequencing, the need for large consortia with well-characterized biospecimens, cause and effect issues, resilience of microbiota to exposure events (requires longitudinal studies), and expanding studies for fungal and viral diversity (most studies used bacterial 16S ribosomal RNA sequencing for microbiota characterization). Despite these challenges, microbiome and cancer epidemiology studies are significant and may facilitate cancer risk assessment, diagnosis, and prognosis. In the future, clinical trials likely will use microbiota modifications to improve the efficacy of existing treatments. PMID:27121074

  13. Developing Technical Skill Assessments

    ERIC Educational Resources Information Center

    Hyslop, Alisha

    2009-01-01

    One of the biggest challenges facing the career and technical education (CTE) community as it works to implement the 2006 Perkins Act is responding to more rigorous requirements for reporting on CTE students' technical skill attainment. The U.S. Department of Education suggested in non-regulatory guidance that states and locals use the number of…

  14. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Threshold requirements for technical assistance grant applications. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.52 Threshold requirements for technical assistanc...

  15. 47 CFR 15.611 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.611 Section 15.611 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Access... shut-off procedure, by the use of a non-volatile memory, or some other method, to immediately restore...

  16. Advances in addressing technical challenges of point-of-care diagnostics in resource-limited settings

    PubMed Central

    Wang, ShuQi; Lifson, Mark A.; Inci, Fatih; Liang, Li-Guo; Sheng, Ye-Feng; Demirci, Utkan

    2016-01-01

    The striking prevalence of HIV, TB and malaria, as well as outbreaks of emerging infectious diseases, such as influenza A (H7N9), Ebola and MERS, poses great challenges for patient care in resource-limited settings (RLS). However, advanced diagnostic technologies cannot be implemented in RLS largely due to economic constraints. Simple and inexpensive point-of-care (POC) diagnostics, which rely less on environmental context and operator training, have thus been extensively studied to achieve early diagnosis and treatment monitoring in non-laboratory settings. Despite great input from material science, biomedical engineering and nanotechnology for developing POC diagnostics, significant technical challenges are yet to be overcome. Summarized here are the technical challenges associated with POC diagnostics from a RLS perspective and the latest advances in addressing these challenges are reviewed. PMID:26777725

  17. Remaining Technical Challenges and Future Plans for Oil-Free Turbomachinery

    NASA Technical Reports Server (NTRS)

    DellaCorte, Christopher; Bruckner, Robert J.

    2010-01-01

    The application of Oil-Free technologies (foil gas bearings, solid lubricants and advanced analysis and predictive modeling tools) to advanced turbomachinery has been underway for several decades. During that time, full commercialization has occurred in aircraft air cycle machines, turbocompressors and cryocoolers and ever-larger microturbines. Emerging products in the automotive sector (turbochargers and superchargers) indicate that high volume serial production of foil bearings is imminent. Demonstration of foil bearings in APU s and select locations in propulsion gas turbines illustrates that such technology also has a place in these future systems. Foil bearing designs, predictive tools and advanced solid lubricants have been reported that can satisfy anticipated requirements but a major question remains regarding the scalability of foil bearings to ever larger sizes to support heavier rotors. In this paper, the technological history, primary physics, engineering practicalities and existing experimental and experiential database for scaling foil bearings are reviewed and the major remaining technical challenges are identified.

  18. Uganda's National Transmission Backbone Infrastructure Project: Technical Challenges and the Way Forward

    NASA Astrophysics Data System (ADS)

    Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.

    2011-10-01

    Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.

  19. 38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...

  20. 38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...

  1. Technical challenges in designing post-marketing eCRFs to address clinical safety and pharmacovigilance needs.

    PubMed

    Lu, Zhengwu

    2010-01-01

    To identify key challenges and propose technical considerations in designing electronic case report form (eCRF) for post-marketing studies, the author undertakes a comprehensive literature review of peer reviewed and grey literature to assess the key aspects, processes, standards, recommendations, and best practices in designing eCRFs based on industry experience in designing and supporting electronic data capture (EDC) studies. Literature search using strings on MEDLINE and PUBMED returned few papers directly related to CRF design. Health informatics and general practice journals were searched and results reviewed. Many conference, government commission, health professional and special interests group websites provide relevant information from practical experience - summarization of this information is presented. Further, we presented a list of concrete technical considerations in dealing with EDC technology/system limitations based on literature assessment and industry implementation experience. It is recognized that cross-functional teams be involved in eCRF design process and decision making. To summarize the keys in designing eCRFs to address post-market study safety and pharmacovigilance needs, the first is to identify required data elements from the study protocol supporting data analyses and reporting requirements. Secondly, accepted best practices, CDASH & CDISC guidelines, and company internal or therapeutic unit standard should be considered and applied. Coding (MedDRA & WHODD) mapping should be managed and implemented as well when possible. Finally, we need to be on top of the EDC technologies, challenge the technologies, drive EDC improvement via working with vendors, and utilize the technologies to drive clinical effectiveness. Copyright (c) 2009 Elsevier Inc. All rights reserved.

  2. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for through D-wall imaging systems. 15.510 Section 15.510 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging...

  3. Managing and Integrating Open Environmental Data - Technological Requirements and Challenges

    NASA Astrophysics Data System (ADS)

    Devaraju, Anusuriya; Kunkel, Ralf; Jirka, Simon

    2014-05-01

    Understanding environment conditions and trends requires information. This information is usually generated from sensor observations. Today, several infrastructures (e.g., GEOSS, EarthScope, NEON, NETLAKE, OOI, TERENO, WASCAL, and PEER-EurAqua) have been deployed to promote full and open exchange of environmental data. Standards for interfaces as well as data models/formats (OGC, CUAHSI, INSPIRE, SEE Grid, ISO) and open source tools have been developed to support seamless data exchange between various domains and organizations. In spite of this growing interest, it remains a challenge to manage and integrate open environmental data on the fly due to the distributed and heterogeneous nature of the data. Intuitive tools and standardized interfaces are vital to hide the technical complexity of underlying data management infrastructures. Meaningful descriptions of raw sensor data are necessary to achieve interoperability among different sources. As raw sensor data sets usually goes through several layers of summarization and aggregation, metadata and quality measures associated with these should be captured. Further processing of sensor data sets requires that they should be made compatible with existing environmental models. We need data policies and management plans on how to handle and publish open sensor data coming from different institutions. Clearly, a better management and usability of open environmental data is crucial, not only to gather large amounts of data, but also to cater various aspects such as data integration, privacy and trust, uncertainty, quality control, visualization, and data management policies. The proposed talk presents several key findings in terms of requirements, ongoing developments and technical challenges concerning these aspects from our recent work. This includes two workshops on open observation data and supporting tools, as well as the long-term environmental monitoring initiatives such as TERENO and TERENO-MED. Workshops Details

  4. 44 CFR 65.3 - Requirement to submit new technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical data. 65.3 Section 65.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding...

  5. Designing a system for patients controlling providers' access to their electronic health records: organizational and technical challenges.

    PubMed

    Leventhal, Jeremy C; Cummins, Jonathan A; Schwartz, Peter H; Martin, Douglas K; Tierney, William M

    2015-01-01

    -control over EHR data displays was complex and required ethical, clinical, database, and programming expertise and difficult choices to overcome technical and health system constraints. Assessing patients' preferences for access to their EHRs and applying them in clinical practice requires wide-ranging technical, clinical, and bioethical expertise, to make tough choices to overcome significant technical and organization challenges.

  6. Technical skills requirement of Indonesian construction labors to work in Malaysia

    NASA Astrophysics Data System (ADS)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  7. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  8. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  9. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  10. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  11. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  12. 75 FR 6683 - Notice of Proposed Information Collection: Comment Request; Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...

  13. 75 FR 18505 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... veterinary use by the International Cooperation on Harmonisation of Technical Requirements for Registration...

  14. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers by design...

  15. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers by design...

  16. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers by design...

  17. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers by design...

  18. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers by design...

  19. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers. 115.40...

  20. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers. 115.40...

  1. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers. 115.40...

  2. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers. 115.40...

  3. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers. 115.40...

  4. Aviation Trends Related to Atmospheric Environment Safety Technologies Project Technical Challenges

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Withrow, Colleen A.; Barr, Lawrence C.; Evans, Joni K.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    Current and future aviation safety trends related to the National Aeronautics and Space Administration's Atmospheric Environment Safety Technologies Project's three technical challenges (engine icing characterization and simulation capability; airframe icing simulation and engineering tool capability; and atmospheric hazard sensing and mitigation technology capability) were assessed by examining the National Transportation Safety Board (NTSB) accident database (1989 to 2008), incidents from the Federal Aviation Administration (FAA) accident/incident database (1989 to 2006), and literature from various industry and government sources. The accident and incident data were examined for events involving fixed-wing airplanes operating under Federal Aviation Regulation (FAR) Parts 121, 135, and 91 for atmospheric conditions related to airframe icing, ice-crystal engine icing, turbulence, clear air turbulence, wake vortex, lightning, and low visibility (fog, low ceiling, clouds, precipitation, and low lighting). Five future aviation safety risk areas associated with the three AEST technical challenges were identified after an exhaustive survey of a variety of sources and include: approach and landing accident reduction, icing/ice detection, loss of control in flight, super density operations, and runway safety.

  5. 78 FR 64146 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...

  6. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  7. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  8. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  9. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  10. Turbines, Wind Tunnels, and Teamwork: The 2017 Collegiate Wind Competition Technical Challenge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Ten college teams put their turbines to the test at the U.S. Department of Energy’s 2017 Collegiate Wind Competition Technical Challenge, held April 20–22 at the National Wind Technology Center (NWTC). The competition showcased a wide variety of turbine designs and highlighted the competitors’ brilliance, agility, and ingenuity. College students weren’t the only future wind energy experts at the NWTC that weekend: elementary and middle school students tested their turbines—crafted creatively from materials like soda bottles and aluminum foil—in the Colorado KidWind Challenge.

  11. 2002 Controls Design Challenge

    NASA Technical Reports Server (NTRS)

    Hess, Ronald A.; Vetter, T. K.; Wells, S. R.

    2002-01-01

    This document is intended to provide the specifications and requirements for a flight control system design challenge. The response to the challenge will involve documenting whether the particular design has met the stated requirements through analysis and computer simulation. The response should be written in the general format of a technical publication with corresponding length limits, e.g., an approximate maximum length of 45 units, with each full-size figure and double-spaced typewritten page constituting one unit.

  12. Mobile health requires mobile security: challenges, solutions, and standardization.

    PubMed

    Pharow, Peter; Blobel, Bernd

    2008-01-01

    Extended communication and advanced cooperation in a permanently growing healthcare and welfare domain require a well-defined set of security services provided by an interoperable security infrastructure based on international and European standards. Any communication and collaboration procedure requires a purpose. But such legal purpose-binding is definitely not the only aspect to carefully be observed and investigated. More and more, aspects of security, safety, privacy, ethics, and quality reach importance while discussing about future-proof health information systems and health networks - regardless whether local, regional or even pan-European networks. During the course of the current paradigm change from an organization-centered to a process-related and to a person-centered health system, different new technologies including mobile solutions need to be applied in order to meet challenges arising from both legal and technical circumstances. Beside the typical Information and Communication Technology systems and applications, the extended use of modern technologies includes large medical devices like, e.g., MRI and CT but also small devices like sensors worn by a person or included in clothing. Security and safety are on top of the priority list. The paper addresses the identification of some specific aspects like mobile technology and safety when moving both IT and people towards mobile health aiming at increasing citizens and patients awareness, confidence, and acceptance in future mobile care - a world often still beyond the horizon.

  13. High School Graduation Minimum Competency Requirements. Final Technical Report.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    This technical report details the testing results and analyses supporting the evaluation findings related to the Austin (Texas) Independent School District (AISD) minimum competency graduation requirements. The graduation competency status of all AISD students in grades 8 to 12 are documented. The report provides additional information on the data…

  14. Thermal Energy for Lunar In Situ Resource Utilization: Technical Challenges and Technology Opportunities

    NASA Technical Reports Server (NTRS)

    Gordon, Pierce E. C.; Colozza, Anthony J.; Hepp, Aloysius F.; Heller, Richard S.; Gustafson, Robert; Stern, Ted; Nakamura, Takashi

    2011-01-01

    Oxygen production from lunar raw materials is critical for sustaining a manned lunar base but is very power intensive. Solar concentrators are a well-developed technology for harnessing the Sun s energy to heat regolith to high temperatures (over 1375 K). The high temperature and potential material incompatibilities present numerous technical challenges. This study compares and contrasts different solar concentrator designs that have been developed, such as Cassegrains, offset parabolas, compound parabolic concentrators, and secondary concentrators. Differences between concentrators made from lenses and mirrors, and between rigid and flexible concentrators are also discussed. Possible substrate elements for a rigid mirror concentrator are selected and then compared, using the following (target) criteria: (low) coefficient of thermal expansion, (high) modulus of elasticity, and (low) density. Several potential lunar locations for solar concentrators are compared; environmental and processing-related challenges related to dust and optical surfaces are addressed. This brief technology survey examines various sources of thermal energy that can be utilized for materials processing on the lunar surface. These include heat from nuclear or electric sources and solar concentrators. Options for collecting and transporting thermal energy to processing reactors for each source are examined. Overall system requirements for each thermal source are compared and system limitations, such as maximum achievable temperature are discussed.

  15. 77 FR 20406 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-0288] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... been developed for veterinary use by the International Cooperation on Harmonisation of Technical...

  16. Challenges in Fingertip Replantation

    PubMed Central

    Kim, Jin-Soo; Yang, Jae-Won; Lee, Dong-Chul; Ki, Sae-Hwi; Roh, Si-Young

    2013-01-01

    Fingertip amputation is a challenging injury to manage. Among various reconstructive procedures, replantation results in superior outcome, but is seldom considered in many institutions. From the identification of vessel ends to reanastomosis of the submillimeter vessels, fingertip's highly specialized anatomy requires technical excellence. By addressing these anatomic challenges, fingertip replantation can be a routine reconstructive option for microvascular surgeons. PMID:24872765

  17. Challenges and Opportunities in Developing the Hawaiian Scientific and Technical Workforce

    NASA Astrophysics Data System (ADS)

    Kennedy, James R.

    2012-01-01

    In searching for dark skies, persistently clear weather, and minimal atmospheric interference, astronomical observing sites are generally located in remote, mountainous locations, and usually far from large communities. Such locations often have weak economies, and shallow workforce pools in the technical and administrative areas generally needed by the observatories. This leads to a problem, and an opportunity, for both the observatories and their local communities. Importing employees from far away locations is costly, leads to high turnover, and deprives the community of economic benefits and the sense of fealty with the observatories that would naturally result if local people occupied these comparatively good paying jobs. While by no means unique, the observatories on Mauna Kea Hawai`i are a clear example of this dual dilemma. This presentation will report findings from a model workforce needs assessment survey of all the Mauna Kea observatories, which has establish likely annual staffing requirements in several categories of technological and administrative support, including the educational entrance requirements. Results indicated that through 2023, 80% of observatory job openings on Hawai`i Island will be in technology and administration. Furthermore, the vast majority of these jobs will require only a two-year or four-year college degree in a relevant field as an entrance requirement. Efforts to realign the existing resources to better meet these common needs will be discussed, including the highly successful partnership between County of Hawai`i Workforce Development Board, the Mauna Kea observatories, the local K-12 systems, Hawai`i Community College, the University of Hawai`i Hilo, and a number of informal education and workplace experience programs. This collaboration has resulted in no fewer than three, interlocked, community programs have stepped up to meet this challenge to the benefit of both the local community and the observatories.

  18. Life Support Requirements and Challenges for NASA's Constellation Program

    NASA Technical Reports Server (NTRS)

    Carasquillo, Robyn

    2007-01-01

    NASA's Constellation Program, which includes the mission objectives of establishing a permanently-manned lunar Outpost, and the exploration of Mars, poses new and unique challenges for human life support systems that will require solutions beyond the Shuttle and International Space Station state of the art systems. In particular, the requirement to support crews for 210 days duration at the lunar outpost with limited resource resupply capability wilt require closed-loop regenerative life support systems with minimal expendables. Planetary environmental conditions such as lunar dust and extreme temperatures, as well as the capability to support frequent and extended-duration EVA's will be particularly challenging. This presentation will summarize the key program and mission life support requirements for the Constellation Program and the unique challenges they present for technology and architecture development.

  19. 47 CFR 25.214 - Technical requirements for space stations in the Satellite Digital Audio Radio Service and...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...

  20. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  1. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  2. 47 CFR 25.214 - Technical requirements for space stations in the Satellite Digital Audio Radio Service and...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...

  3. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  4. Comparison of Traditional and Innovative Techniques to Solve Technical Challenges

    NASA Technical Reports Server (NTRS)

    Perchonok, Michele

    2010-01-01

    Although NASA has an adequate food system for current missions, research is required to accommodate new requirements for future NASA exploration missions. The Inadequate Food System risk reflects the need to develop requirements and technologies that will enable NASA to provide the crew with a safe, nutritious and acceptable food system while effectively balancing appropriate resources such as mass, volume, and crew time in exploratory missions. As we go deeper into space or spend more time on the International Space Station (ISS), there will be requirements for packaged food to be stored for 3 5 years. New food packaging technologies are needed that have adequate oxygen and water barrier properties to maintain the foods' quality over this extended shelf life. NASA has been unsuccessful in identify packaging materials that meet the necessary requirements when using several traditional routes including literature reviews, workshops, and internal shelf life studies on foods packaged in various packaging materials. Small Business Innovative Research grants were used for accelerating food packaging materials research with limited success. In order to accelerate the process, a theoretical challenge was submitted to InnoCentive resulting in a partial award. A similar food packaging challenge was submitted to Yet2.com and several potential commercial packaging material suppliers were identified that, at least partially, met the requirements. Comparisons and results of these challenges will be discussed.

  5. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  6. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  7. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  8. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  9. 22 CFR 124.8 - Clauses required both in manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... agreements and technical assistance agreements. 124.8 Section 124.8 Foreign Relations DEPARTMENT OF STATE... Clauses required both in manufacturing license agreements and technical assistance agreements. The following statements must be included both in manufacturing license agreements and in technical assistance...

  10. Perfusion CT to assess angiogenesis in colon cancer: technical limitations and practical challenges.

    PubMed

    Dighe, S; Castellano, E; Blake, H; Jeyadevan, N; Koh, M U; Orten, M; Swift, I; Brown, G

    2012-10-01

    Perfusion CT may have the potential to quantify the degree of angiogenesis of solid tumours in vivo. This study aims to identify the practical and technical challenges inherent to the technique, and evaluate its feasibility in colorectal tumours. 51 patients from 2 institutions prospectively underwent a single perfusion CT on 2 different multidetector scanners. The patients were advised to breath-hold as long as possible, followed by shallow breathing, and were given intravenous buscopan to reduce movement. Numerous steps were explored to identify the challenges. 43 patients successfully completed the perfusion CT as per protocol. Inability to detect the tumour (n=3), misplacement of dynamic sequence co-ordinates (n=2), failure of contrast injection (n=2) and displacement of tumour (n=1) were the reasons for failure. In 14 cases excessive respiratory motion displaced the tumour out of the scanning field along the temporal sequence, leading to erroneous data capture. In nine patients, minor displacements of the tumour were corrected by repositioning the region of interest (ROI) to its original position after reviewing each dynamic sequence slice. In 20 patients the tumour was stable, and data captured from the ROI were representative, and could have been analysed by commercially available Body Tumor Perfusion 3.0® software (GE Healthcare, Waukesha, WI). Hence all data were manually analysed by MATLAB® processing software (MathWorks, Cambridge, UK). Perfusion CT in tumours susceptible to motion during acquisition makes accurate data capture challenging and requires meticulous attention to detail. Motion correction software is essential if perfusion CT is to be used routinely in colorectal cancer.

  11. Sortie laboratory, phase B technical summary. [design and operational requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.

  12. Fundamental Aeronautics Program: Overview of Propulsion Work in the Supersonic Cruise Efficiency Technical Challenge

    NASA Technical Reports Server (NTRS)

    Castner, Ray

    2012-01-01

    The Supersonics Project, part of NASA's Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2012) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  13. Technical challenges and future direction for high-efficiency metal hydride thermal energy storage systems

    NASA Astrophysics Data System (ADS)

    Ward, Patrick A.; Corgnale, Claudio; Teprovich, Joseph A.; Motyka, Theodore; Hardy, Bruce; Sheppard, Drew; Buckley, Craig; Zidan, Ragaiy

    2016-04-01

    Recently, there has been increasing interest in thermal energy storage (TES) systems for concentrated solar power (CSP) plants, which allow for continuous operation when sunlight is unavailable. Thermochemical energy storage materials have the advantage of much higher energy densities than latent or sensible heat materials. Furthermore, thermochemical energy storage systems based on metal hydrides have been gaining great interest for having the advantage of higher energy densities, better reversibility, and high enthalpies. However, in order to achieve higher efficiencies desired of a thermal storage system by the US Department of Energy, the system is required to operate at temperatures >600 °C. Operation at temperatures >600 °C presents challenges including material selection, hydrogen embrittlement and permeation of containment vessels, appropriate selection of heat transfer fluids, and cost. Herein, the technical difficulties and proposed solutions associated with the use of metal hydrides as TES materials in CSP applications are discussed and evaluated.

  14. Home telemonitoring of vital signs--technical challenges and future directions.

    PubMed

    Celler, Branko G; Sparks, Ross S

    2015-01-01

    The telemonitoring of vital signs from the home is an essential element of telehealth services for the management of patients with chronic conditions, such as congestive heart failure (CHF), chronic obstructive pulmonary disease (COPD), diabetes, or poorly controlled hypertension. Telehealth is now being deployed widely in both rural and urban settings, and in this paper, we discuss the contribution made by biomedical instrumentation, user interfaces, and automated risk stratification algorithms in developing a clinical diagnostic quality longitudinal health record at home. We identify technical challenges in the acquisition of high-quality biometric signals from unsupervised patients at home, identify new technical solutions and user interfaces, and propose new measurement modalities and signal processing techniques for increasing the quality and value of vital signs monitoring at home. We also discuss use of vital signs data for the automated risk stratification of patients, so that clinical resources can be targeted to those most at risk of unscheduled admission to hospital. New research is also proposed to integrate primary care, hospital, personal genomic, and telehealth electronic health records, and apply predictive analytics and data mining for enhancing clinical decision support.

  15. Technical Challenges for a Comprehensive Test Ban: A historical perspective to frame the future (Invited)

    NASA Astrophysics Data System (ADS)

    Wallace, T. C.

    2013-12-01

    In the summer of 1958 scientists from the Soviet block and the US allies met in Geneva to discuss what it would take to monitor a forerunner to a Comprehensive Test Ban Treaty at the 'Conference of Experts to Study the Possibility of Detecting Violations of a Possible Agreement on Suspension of Nuclear Tests'. Although armed with a limited resume of observations, the conference recommended a multi-phenomenology approach (air sampling, acoustics, seismic and electromagnetic) deployed it a network of 170 sites scattered across the Northern Hemisphere, and hypothesized a detection threshold of 1kt for atmospheric tests and 5kt for underground explosions. The conference recommendations spurred vigorous debate, with strong disagreement with the stated detection hypothesis. Nevertheless, the technical challenges posed lead to a very focused effort to improve facilities, methodologies and, most importantly, research and development on event detection, location and identification. In the ensuing 50 years the various challenges arose and were eventually 'solved'; these included quantifying yield determination to enter a Limited Threshold Test Ban, monitoring broad areas of emerging nuclear nations, and after the mid-1990s lowering the global detection threshold to sub-kiloton levels for underground tests. Today there is both an international monitoring regime (ie, the International Monitoring System, or IMS) and a group of countries that have their own national technical means (NTM). The challenges for the international regime are evolving; the IMS has established itself as a very credible monitoring system, but the demand of a CTBT to detect and identify a 'nuclear test' of diminished size (zero yield) poses new technical hurdles. These include signal processing and understanding limits of resolution, location accuracy, integration of heterogeneous data, and accurately characterizing anomalous events. It is possible to extrapolate past technical advances to predict what

  16. White Paper: Landscape on Technical and Conceptual Requirements and Competence Framework in Drug/Disease Modeling and Simulation

    PubMed Central

    Vlasakakis, G; Comets, E; Keunecke, A; Gueorguieva, I; Magni, P; Terranova, N; Della Pasqua, O; de Lange, E C; Kloft, C

    2013-01-01

    Pharmaceutical sciences experts and regulators acknowledge that pharmaceutical development as well as drug usage requires more than scientific advancements to cope with current attrition rates/therapeutic failures. Drug disease modeling and simulation (DDM&S) creates a paradigm to enable an integrated and higher-level understanding of drugs, (diseased)systems, and their interactions (systems pharmacology) through mathematical/statistical models (pharmacometrics)1—hence facilitating decision making during drug development and therapeutic usage of medicines. To identify gaps and challenges in DDM&S, an inventory of skills and competencies currently available in academia, industry, and clinical practice was obtained through survey. The survey outcomes revealed benefits, weaknesses, and hurdles for the implementation of DDM&S. In addition, the survey indicated that no consensus exists about the knowledge, skills, and attributes required to perform DDM&S activities effectively. Hence, a landscape of technical and conceptual requirements for DDM&S was identified and serves as a basis for developing a framework of competencies to guide future education and training in DDM&S. PMID:23887723

  17. English Skills for Engineers Required by the English Technical Writing Test

    NASA Astrophysics Data System (ADS)

    Kyouno, Noboru

    Japanese English education has focused mainly on teaching passive skills such as reading and listening, whereas actual business activities in society require active skills such as writing and speaking in addition to the passive skills. This educational situation is estimated to be a reason Japanese engineers are less confident in writing and speaking than in reading and listening. This paper focuses on details of the English Technical Writing Test provided by the Japan Society of Technical Communication and emphasizes the importance of the active skills, mainly focusing on what skills should be taught in the future and how to develop these skills. This paper also stresses the necessity of learning rhetoric-related skills, concept of information words, as well as paragraph reading and writing skills based on the concept of the 3Cs (Correct, Clear, and Concise) as a means to develop technical writing skills for engineers.

  18. Managing Adaptive Challenges: Learning with Principals in Bermuda and Florida

    ERIC Educational Resources Information Center

    Drago-Severson, Eleanor; Maslin-Ostrowski, Patricia; Hoffman, Alexander M.; Barbaro, Justin

    2014-01-01

    We interviewed eight principals from Bermuda and Florida about how they identify and manage their most pressing challenges. Their challenges are composed of both adaptive and technical work, requiring leaders to learn to diagnose and manage them. Challenges focused on change and were traced to accountability contexts, yet accountability was not…

  19. 76 FR 35103 - Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... which initial and transition flight training must include an in-flight element. Technical Amendment This.... 28471; Amendment Nos. 121-355 and 135-125] RIN 2120-AF08 Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment AGENCY: Federal Aviation Administration (FAA...

  20. 48 CFR 3419.870 - Acquisition of technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... competition to submit written technical proposals. Otherwise, ED holds oral discussions with the participating... participating in a limited technical competition based on the written technical proposals or oral discussions... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Acquisition of technical...

  1. 47 CFR 80.271 - Technical requirements for portable survival craft radiotelephone transceivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... craft radiotelephone transceivers. 80.271 Section 80.271 Telecommunication FEDERAL COMMUNICATIONS... Authorization for Compulsory Ships § 80.271 Technical requirements for portable survival craft radiotelephone transceivers. (a) Portable survival craft radiotelephone transceivers must comply with the following: (1) The...

  2. Shuttle ku-band communications/radar technical concepts

    NASA Technical Reports Server (NTRS)

    Griffin, J. W.; Kelley, J. S.; Steiner, A. W.; Vang, H. A.; Zrubek, W. E.; Huth, G. K.

    1985-01-01

    Technical data on the Shuttle Orbiter K sub u-band communications/radar system are presented. The more challenging aspects of the system design and development are emphasized. The technical problems encountered and the advancements made in solving them are discussed. The radar functions are presented first. Requirements and design/implementation approaches are discussed. Advanced features are explained, including Doppler measurement, frequency diversity, multiple pulse repetition frequencies and pulse widths, and multiple modes. The communications functions that are presented include advances made because of the requirements for multiple communications modes. Spread spectrum, quadrature phase shift keying (QPSK), variable bit rates, and other advanced techniques are discussed. Performance results and conclusions reached are outlined.

  3. Technical aspects and limitations of fractional flow reserve measurement.

    PubMed

    Jerabek, Stepan; Kovarnik, Tomas

    2018-02-27

    The only indication for coronary revascularization is elimination of ischaemia. Invasive hemodynamic methods (fractional flow reserve - FFR and instantaneous wave-free ratio (iFR) are superior to coronary angiography in detection of lesions causing myocardial ischaemia. Current European guidelines for myocardial revascularization recommend using of FFR for detection of functional assessment of lesions severity in category IA and number of these procedures increases. However, routine usage of these methods requires knowledge of technical requirements and limitations. The aim of the study is to summarise good clinical practice for FFR and iFR measurements with explanation of possible technical challenges, that are necessary for increasing of measurement accuracy. Authors describe frequent technical mistakes and malpractice during invasive assessment of lesion severity in coronary arteries.

  4. Technical Communication Internship Requirements in the Academic Economy: How We Compare among Ourselves and across Other Applied Fields

    ERIC Educational Resources Information Center

    Savage, Gerald J.; Seible, Marcea K.

    2010-01-01

    This article reports a study of internship requirements in technical communication programs compared with three established professions and one emerging profession that have certification or licensing requirements for practitioners. The study addresses three questions about technical communication internship programs: 1) Are internships offered as…

  5. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    ERIC Educational Resources Information Center

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  6. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  7. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  8. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  9. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  10. 2014 NASA Centennial Challenges Sample Return Robot Challenge

    NASA Image and Video Library

    2014-06-14

    Members of team Mountaineers pose with officials from the 2014 NASA Centennial Challenges Sample Return Robot Challenge on Saturday, June 14, 2014 at Worcester Polytechnic Institute (WPI) in Worcester, Mass. Team Mountaineer was the only team to complete the level one challenge this year. Team Mountaineer members, from left (in blue shirts) are: Ryan Watson, Marvin Cheng, Scott Harper, Jarred Strader, Lucas Behrens, Yu Gu, Tanmay Mandal, Alexander Hypes, and Nick Ohi Challenge judges and competition staff (in white and green polo shirts) from left are: Sam Ortega, NASA Centennial Challenge program manager; Ken Stafford, challenge technical advisor, WPI; Colleen Shaver, challenge event manager, WPI. During the competition, teams were required to demonstrate autonomous robots that can locate and collect samples from a wide and varied terrain, operating without human control. The objective of this NASA-WPI Centennial Challenge was to encourage innovations in autonomous navigation and robotics technologies. Innovations stemming from the challenge may improve NASA's capability to explore a variety of destinations in space, as well as enhance the nation's robotic technology for use in industries and applications on Earth. Photo Credit: (NASA/Joel Kowsky)

  11. The Changing Role of Vocational and Technical Education and Training (VOTEC). Women in Vocational and Technical Education: Changes and Challenges.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France).

    Changes in the vocational and technical education (VTE) opportunities available for women in Organisation for Economic Cooperation Development (OECD) member countries in response to changing labor markets and job skill requirements were discussed at a June 1994 meeting of experts. The discussions focused on the following issues: gender differences…

  12. Rationale of technical requirements for NRG-BR001: The first NCI-sponsored trial of SBRT for the treatment of multiple metastases.

    PubMed

    Al-Hallaq, Hania A; Chmura, Steven; Salama, Joseph K; Winter, Kathryn A; Robinson, Clifford G; Pisansky, Thomas M; Borges, Virginia; Lowenstein, Jessica R; McNulty, Susan; Galvin, James M; Followill, David S; Timmerman, Robert D; White, Julia R; Xiao, Ying; Matuszak, Martha M

    In 2014, the NRG Oncology Group initiated the first National Cancer Institute-sponsored, phase 1 clinical trial of stereotactic body radiation therapy (SBRT) for the treatment of multiple metastases in multiple organ sites (BR001; NCT02206334). The primary endpoint is to test the safety of SBRT for the treatment of 2 to 4 multiple lesions in several anatomic sites in a multi-institutional setting. Because of the technical challenges inherent to treating multiple lesions as their spatial separation decreases, we present the technical requirements for NRG-BR001 and the rationale for their selection. Patients with controlled primary tumors of breast, non-small cell lung, or prostate are eligible if they have 2 to 4 metastases distributed among 7 extracranial anatomic locations throughout the body. Prescription and organ-at-risk doses were determined by expert consensus. Credentialing requirements include (1) irradiation of the Imaging and Radiation Oncology Core phantom with SBRT, (2) submitting image guided radiation therapy case studies, and (3) planning the benchmark. Guidelines for navigating challenging planning cases including assessing composite dose are discussed. Dosimetric planning to multiple lesions receiving differing doses (45-50 Gy) and fractionation (3-5) while irradiating the same organs at risk is discussed, particularly for metastases in close proximity (≤5 cm). The benchmark case was selected to demonstrate the planning tradeoffs required to satisfy protocol requirements for 2 nearby lesions. Examples of passing benchmark plans exhibited a large variability in plan conformity. NRG-BR001 was developed using expert consensus on multiple issues from the dose fractionation regimen to the minimum image guided radiation therapy guidelines. Credentialing was tied to the task rather than the anatomic site to reduce its burden. Every effort was made to include a variety of delivery methods to reflect current SBRT technology. Although some simplifications

  13. Technical writing versus technical writing

    NASA Technical Reports Server (NTRS)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  14. Machine learning challenges in Mars rover traverse science

    NASA Technical Reports Server (NTRS)

    Castano, R.; Judd, M.; Anderson, R. C.; Estlin, T.

    2003-01-01

    The successful implementation of machine learning in autonomous rover traverse science requires addressing challenges that range from the analytical technical realm, to the fuzzy, philosophical domain of entrenched belief systems within scientists and mission managers.

  15. Constitutional Challenge to Dormitory Residency Requirements: End of the Tunnel?

    ERIC Educational Resources Information Center

    Reed, Omer Lee, Jr.; Irving, Joe D.

    1976-01-01

    Since 1969 dormitory residency requirements have been under constitutional challenge. This discussion suggests a judicial trend supporting the requirements has been established. Housing administrators should note that not every requirement has been upheld and that the present trend is no guarantee against a future reversal of direction by the…

  16. Minimally Invasive Implantable Fetal Micropacemaker: Mechanical Testing and Technical Refinements

    PubMed Central

    Zhou, Li; Vest, Adriana N.; Peck, Raymond A.; Sredl, Jonathan P.; Huang, Xuechen; Bar-Cohen, Yaniv; Silka, Michael J.; Pruetz, Jay D.; Chmait, Ramen H.; Loeb, Gerald E.

    2016-01-01

    This paper discusses the technical and safety requirements for cardiac pacing of a human fetus with heart failure and hydrops fetalis secondary to complete heart block. Engineering strategies to meet specific technical requirements were integrated into a systematic design and implementation consisting of a novel fetal micropacemaker, a percutaneous implantation system, and a sterile package that enables device storage and recharging maintenance in a clinical setting. We further analyzed observed problems on myocardial fixation and pacing lead fatigue previously reported in earlier preclinical trials. This paper describes the technical refinements of the implantable fetal micropacemaker to overcome these challenges. The mechanical performance has been extensively tested to verify the improvement of reliability and safety margins of the implantation system. PMID:27021067

  17. Technical Writing Teachers and the Challenges of Desktop Publishing.

    ERIC Educational Resources Information Center

    Kalmbach, James

    1988-01-01

    Argues that technical writing teachers must understand desktop publishing. Discusses the strengths that technical writing teachers bring to desktop publishing, and the impact desktop publishing will have on technical writing courses and programs. (ARH)

  18. Approach to the E-ELT dome and main structure challenges

    NASA Astrophysics Data System (ADS)

    Bilbao, Armando; Murga, Gaizka; Gómez, Celia; Llarena, Javier

    2014-07-01

    The E-ELT as a whole could be classified as an extremely challenging project. More precisely, it should be defined as an array of many different sub-challenges, which comprise technical, logistical and managerial matters. This paper reviews some of these critical challenges, in particular those related to the Dome and the Main Structure, suggesting ways to face them in the most pragmatic way possible. Technical challenges for the Dome and the Main Structure are mainly related to the need to upscale current design standards to an order of magnitude larger design. Trying a direct design escalation is not feasible; it would not work. A design effort is needed to cross hybridize current design standards with technologies coming from other different applications. Innovative design is therefore not a wish but a must. And innovative design comes along with design risk. Design risk needs to be tackled from two angles: on the one hand through thorough design validation analysis and on the other hand through extensive pre-assembly and testing. And, once again, full scale integrated pre-assembly and testing of extremely large subsystems is not always possible. Therefore, defining a comprehensive test plan for critical components, critical subsystems and critical subassemblies becomes essential. Logistical challenges are linked to the erection site. Cerro Armazones is a remote site and this needs to be considered when evaluating transport and erection requirements. But it is not only the remoteness of the site that needs to be considered. The size of both Dome and Main Structure require large construction cranes and a well defined erection plan taking into account pre-assembly strategies, limited plan area utilization, erection sequence, erection stability during intermediate stages and, very specifically, efficient coordination between the Dome and the Main Structure erection processes. Managerial issues pose another set of challenges in this project. Both the size of the

  19. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  20. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  1. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  2. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  3. 19 CFR 115.65 - Technical requirements for road vehicles by design type.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...

  4. 76 FR 57060 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-D-0588] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Draft Guidance for Industry on Pharmacovigilance of Veterinary Medicinal Products: Electronic...

  5. [OurPuppet - Caring support with an interactive puppet for informal caregivers : Opportunities and challenges in the social and technical developmental process].

    PubMed

    Kuhlmann, Andrea; Reuter, Verena; Schramek, Renate; Dimitrov, Todor; Görnig, Matthias; Matip, Eva-Maria; Matthies, Olaf; Naroska, Edwin

    2018-01-01

    The "OurPuppet" project comprises a sensor-based, interactive puppet that will be developed to communicate with people in need of care during a short period of absence of the informal caregiver. Specially qualified puppet guides will support the use of the new technical development. They instruct people with dementia and caregivers on how to use the puppet and supervise the (informal) care relationship through discussions on a regular basis. The article shows the specific components of users' needs for which the concrete technical development should find answers. It also focuses on the opportunities and challenges for the technical and social developmental process accompanied by these demands. The analysis of the users' needs is based on a participatory approach. Semi-structured focus group interviews were conducted with informal caregivers, nurses and volunteers in order to identify typical situations in home care settings. The interviews were paraphrased and summarized in order to deduce inductive categories (qualitative data analysis), which describe everyday situations that the technical system should address. Such analyses provide information about the needs of potential users and indicate how to design such technical systems. Furthermore, opportunities and challenges of the development process as well as important contextual information were identified.

  6. 50 CFR 91.13 - Technical requirements for design and submission of entry.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false Technical requirements for design and submission of entry. 91.13 Section 91.13 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) MISCELLANEOUS PROVISIONS MIGRATORY BIRD HUNTING AND CONSERVATION STAMP CONTEST Procedures for Entering the...

  7. 50 CFR 91.13 - Technical requirements for design and submission of entry.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Technical requirements for design and submission of entry. 91.13 Section 91.13 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) MISCELLANEOUS PROVISIONS MIGRATORY BIRD HUNTING AND CONSERVATION STAMP CONTEST Procedures for Entering the...

  8. Describing Acupuncture: A New Challenge for Technical Communicators.

    ERIC Educational Resources Information Center

    Karanikas, Marianthe

    1997-01-01

    Considers acupuncture as an increasingly popular alternative medical therapy, but difficult to describe in technical communication. Notes that traditional Chinese medical explanations of acupuncture are unscientific, and that scientific explanations of acupuncture are inconclusive. Finds that technical communicators must translate acupuncture for…

  9. Meeting the challenge of a 50000-hour-life-time requirement

    NASA Technical Reports Server (NTRS)

    Vest, C. E.; Studer, P. A.

    1971-01-01

    Space mission requirements for the 70's have established a 50,000-hour-lifetime challenge for the mechanisms designer. This challenge may be met by two approaches: (1) development of new materials for wear-prone elements, and (2) design innovation of new electromechanical devices that do not include mechanical wear-prone components. Present state-of-the-art materials require restricted operation regarding load, speed, and power for gears, bearings, and brush-slipring components. These restrictions are discussed, and methods of improvement are suggested. The design-innovations approach is discussed and is illustrated by the design of an experimental magnetically suspended motor.

  10. Introduction of Geographical Information Systems (GIS) in Technical University Education in Ghana: Challenges and the Way Forward

    ERIC Educational Resources Information Center

    Acquah, Prince C.; Asamoah, Jack N.; Konadu, Daniel D.

    2017-01-01

    Geographic Information System (GIS) continue to play very important role in improving spatial thinking skills of graduates from higher educational institutions. However, teaching and learning of GIS at the technical university level in Ghana remains very limited due to some implementation challenges. This paper reviews the implementation of GIS in…

  11. 76 FR 57058 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Guidance for Industry on Studies To Evaluate the Metabolism and Residue Kinetics of Veterinary...

  12. Technical Requirements Analysis and Control Systems (TRACS) Initial Operating Capability (IOC) documentation

    NASA Technical Reports Server (NTRS)

    Hammond, Dana P.

    1991-01-01

    The Technical Requirements Analysis and Control Systems (TRACS) software package is described. TRACS offers supplemental tools for the analysis, control, and interchange of project requirements. This package provides the fundamental capability to analyze and control requirements, serves a focal point for project requirements, and integrates a system that supports efficient and consistent operations. TRACS uses relational data base technology (ORACLE) in a stand alone or in a distributed environment that can be used to coordinate the activities required to support a project through its entire life cycle. TRACS uses a set of keyword and mouse driven screens (HyperCard) which imposes adherence through a controlled user interface. The user interface provides an interactive capability to interrogate the data base and to display or print project requirement information. TRACS has a limited report capability, but can be extended with PostScript conventions.

  13. Strategic Management for Competitive Advantage: A Case Study of Higher Technical and Vocational Education in Taiwan

    ERIC Educational Resources Information Center

    Huang, Hsun-I; Lee, Cheng-Fei

    2012-01-01

    Higher technical and vocational education institutions in Taiwan face the pressure of an oversupply of student places and fierce competition from domestic and international institutions. To cope with these challenges, higher technical and vocational education institutions that are better equipped to respond to market requirements are expected to…

  14. 2014 NASA Centennial Challenges Sample Return Robot Challenge

    NASA Image and Video Library

    2014-06-14

    The NASA Centennial Challenges prize, level one, is presented to team Mountaineers for successfully completing level one of the NASA 2014 Sample Return Robot Challenge, from left, Ken Stafford, WPI Challenge technical advisor; Colleen Shaver, WPI Challenge Manager; Ryan Watson, Team Mountaineers; Marvin Cheng, Team Mountaineers; Alexander Hypes, Team Mountaineers; Jarred Strader, Team Mountaineers; Lucas Behrens, Team Mountaineers; Yu Gu, Team Mountaineers; Nick Ohi, Team Mountaineers; Dorothy Rasco, NASA Deputy Associate Administrator for the Space Technology Mission Directorate; Scott Harper, Team Mountaineers; Tanmay Mandal, Team Mountaineers; David Miller, NASA Chief Technologist; Sam Ortega, NASA Program Manager for Centennial Challenges, Saturday, June 14, 2014, at Worcester Polytechnic Institute (WPI) in Worcester, Mass. Team Mountaineers was the only team to complete the level one challenge. During the competition, teams were required to demonstrate autonomous robots that can locate and collect samples from a wide and varied terrain, operating without human control. The objective of this NASA-WPI Centennial Challenge was to encourage innovations in autonomous navigation and robotics technologies. Innovations stemming from the challenge may improve NASA's capability to explore a variety of destinations in space, as well as enhance the nation's robotic technology for use in industries and applications on Earth. Photo Credit: (NASA/Joel Kowsky)

  15. Constraints and challenges of meeting the water requirements of livestock in Ethiopia: cases of Lume and Siraro districts.

    PubMed

    Amenu, Kebede; Markemann, André; Roessler, Regina; Siegmund-Schultze, Marianna; Abebe, Girma; Valle Zárate, Anne

    2013-10-01

    Compared to the total water use in livestock production systems, water for livestock drinking is small in amount but is an important requirement for health and productivity of animals. This study was carried out to assess constraints and challenges of meeting drinking water requirements of livestock in rural mixed smallholder crop-livestock farming districts in the Ethiopian Rift Valley area. Data was collected by individual interviews with randomly selected respondents and farmer group discussions. Farmers ranked feed and water scarcity as the two most important constraints for livestock husbandry, although the ranking order differed between districts and villages. Poor quality water was a concern for the communities in proximity to urban settlements or industrial establishments. Water provision for livestock was challenging during the dry season, since alternative water sources dried up or were polluted. Though rainwater harvesting by dugout constructions was practiced to cope with water scarcity, farmers indicated that mismanagement of the harvested water was posing health risks on both livestock and people. A sustainable water provision for livestock in the area, thus, depends on use of different water sources (intermittent or perennial) that should be properly managed. Industrial establishments should adopt an environment-friendly production to minimize pollution of water resources used for livestock consumption. Technical support to farmers is required in proper design and use of existing rainwater harvesting systems. Further investigations are recommended on effect of poor quality water (perceived by farmers) on performance of livestock.

  16. Photodynamic therapy for treatment of solid tumors – potential and technical challenges

    PubMed Central

    Huang, Zheng; Xu, Heping; Meyers, Arlen D.; Musani, Ali I.; Wang, Luowei; Tagg, Randall; Barqawi, Al B.; Chen, Yang K.

    2008-01-01

    Photodynamic therapy (PDT) involves the administration of photosensitizer followed by local illumination with visible light of specific wavelength(s). In the presence of oxygen molecules, the light illumination of photosensitizer can lead to a series of photochemical reactions and consequently the generation of cytotoxic species. The quantity and location of PDT-induced cytotoxic species determine the nature and consequence of PDT. Much progress has been seen in both basic research and clinical application in recent years. Although the majority of approved PDT clinical protocols have primarily been used for the treatment of superficial lesions of both malignant and non-malignant diseases, interstitial PDT for the ablation of deep-seated solid tumors are now being investigated worldwide. The complexity of the geometry and non-homogeneity of solid tumor pose a great challenge on the implementation of minimally invasive interstitial PDT and the estimation of PDT dosimetry. This review will discuss the recent progress and technical challenges of various forms of interstitial PDT for the treatment of parenchymal and/or stromal tissues of solid tumors. PMID:18642969

  17. Glucose Meters: A Review of Technical Challenges to Obtaining Accurate Results

    PubMed Central

    Tonyushkina, Ksenia; Nichols, James H.

    2009-01-01

    Glucose meters are universally utilized in the management of hypoglycemic and hyperglycemic disorders in a variety of healthcare settings. Establishing the accuracy of glucose meters, however, is challenging. Glucose meters can only analyze whole blood, and glucose is unstable in whole blood. Technical accuracy is defined as the closeness of agreement between a test result and the true value of that analyte. Truth for glucose is analysis by isotope dilution mass spectrometry, and frozen serum standards analyzed by this method are available from the National Institute of Standards and Technology. Truth for whole blood has not been established, and cells must be separated from the whole blood matrix before analysis by a method like isotope dilution mass spectrometry. Serum cannot be analyzed by glucose meters, and isotope dilution mass spectrometry is not commonly available in most hospitals and diabetes clinics to evaluate glucose meter accuracy. Consensus standards recommend comparing whole blood analysis on a glucose meter against plasma/serum centrifuged from a capillary specimen and analyzed by a clinical laboratory comparative method. Yet capillary samples may not provide sufficient volume to test by both methods, and venous samples may be used as an alternative when differences between venous and capillary blood are considered. There are thus multiple complexities involved in defining technical accuracy and no clear consensus among standards agencies and professional societies on accuracy criteria. Clinicians, however, are more concerned with clinical agreement of the glucose meter with a serum/plasma laboratory result. Acceptance criteria for clinical agreement vary across the range of glucose concentrations and depend on how the result will be used in screening or management of the patient. A variety of factors can affect glucose meter results, including operator technique, environmental exposure, and patient factors, such as medication, oxygen therapy

  18. 1988 Underground Storage Tanks; Technical Requirements; Final Rule and Underground Storage Tanks Containing Petroleum-Financial Responsibility Requirements and State Program Approval Objective; Final Rule

    EPA Pesticide Factsheets

    EPA's 1988 regulations concerning USTs are contained in 40 CFR Part 280, 40 CFR Part 281 and 40 CFR Parts 282.50-282.105 and divided into three sections: technical requirements, financial responsibility requirements, and state program approval objectives.

  19. INDOT Technical Training Plan : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  20. 76 FR 66078 - Notice of Industry Workshop on Technical and Regulatory Challenges in Deep and Ultra-Deep Outer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-25

    ...-0087] Notice of Industry Workshop on Technical and Regulatory Challenges in Deep and Ultra-Deep Outer... and gas exploration and production in deep and ultra-deep OCS waters. Through this workshop, BSEE will... structured venue for consultation among offshore deepwater oil and gas industry and regulatory experts in...

  1. IT Labs Proof-of-Concept Project: Technical Data Interoperability (TDI) Pathfinder Via Emerging Standards

    NASA Technical Reports Server (NTRS)

    Conroy, Mike; Gill, Paul; Ingalls, John; Bengtsson, Kjell

    2014-01-01

    No known system is in place to allow NASA technical data interoperability throughout the whole life cycle. Life Cycle Cost (LCC) will be higher on many developing programs if action isn't taken soon to join disparate systems efficiently. Disparate technical data also increases safety risks from poorly integrated elements. NASA requires interoperability and industry standards, but breaking legacy ways is a challenge.

  2. Wearable devices for blood purification: principles, miniaturization, and technical challenges.

    PubMed

    Armignacco, Paolo; Lorenzin, Anna; Neri, Mauro; Nalesso, Federico; Garzotto, Francesco; Ronco, Claudio

    2015-01-01

    The prevalences of end-stage renal disease (ESRD) and renal replacement therapy (RRT) continue to increase across the world imposing staggering costs on providers. Therefore, strategies to optimize the treatment and improve survival are of fundamental importance. Despite the benefits of daily dialysis, its implementation is difficult and wearable hemodialysis might represent an alternative by which frequent treatments can be delivered to ESRD patients with much less interference in their routines promoting better quality of life. The development of the wearable artificial kidney (WAK) requires incorporation of basic components of a dialysis system into a wearable device that allows mobility, miniaturization, and above all, patient-oriented management. The technical requirements necessary for WAK can be divided into the following broad categories: dialysis membranes, dialysis regeneration, vascular access, patient monitoring systems, and power sources. Pumping systems for blood and other fluids are the most critical components of the entire device. © 2015 Wiley Periodicals, Inc.

  3. Technical documentation challenges in aviation maintenance : a proceedings report.

    DOT National Transportation Integrated Search

    2012-11-01

    The 2012 Technical Documentation workshop addressed both problems and solutions associated with technical : documentation for maintenance. These issues are known to cause errors, rework, maintenance delays, other : safety hazards, and FAA administrat...

  4. Analysis of the Parameters Required for Performance Monitoring and Assessment of Military Communications Systems by Military Technical Controller

    DTIC Science & Technology

    1975-12-01

    139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters

  5. 77 FR 34784 - Removal of Six Month Line Check Requirement for Pilots Over Age 60; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...-0486; Amdt. No. 121-359] Removal of Six Month Line Check Requirement for Pilots Over Age 60; Technical... years of age that applied to air carriers engaged in part 121 operations. This technical amendment... December 13, 2007. This legislation raised the upper age limit for pilots in part 121 from age 60 to age 65...

  6. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  7. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  8. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  9. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  10. Additive Manufacturing in Production: A Study Case Applying Technical Requirements

    NASA Astrophysics Data System (ADS)

    Ituarte, Iñigo Flores; Coatanea, Eric; Salmi, Mika; Tuomi, Jukka; Partanen, Jouni

    Additive manufacturing (AM) is expanding the manufacturing capabilities. However, quality of AM produced parts is dependent on a number of machine, geometry and process parameters. The variability of these parameters affects the manufacturing drastically and therefore standardized processes and harmonized methodologies need to be developed to characterize the technology for end use applications and enable the technology for manufacturing. This research proposes a composite methodology integrating Taguchi Design of Experiments, multi-objective optimization and statistical process control, to optimize the manufacturing process and fulfil multiple requirements imposed to an arbitrary geometry. The proposed methodology aims to characterize AM technology depending upon manufacturing process variables as well as to perform a comparative assessment of three AM technologies (Selective Laser Sintering, Laser Stereolithography and Polyjet). Results indicate that only one machine, laser-based Stereolithography, was feasible to fulfil simultaneously macro and micro level geometrical requirements but mechanical properties were not at required level. Future research will study a single AM system at the time to characterize AM machine technical capabilities and stimulate pre-normative initiatives of the technology for end use applications.

  11. Metrology requirements for the serial production of ELT primary mirror segments

    NASA Astrophysics Data System (ADS)

    Rees, Paul C. T.; Gray, Caroline

    2015-08-01

    The manufacture of the next generation of large astronomical telescopes, the extremely large telescopes (ELT), requires the rapid manufacture of greater than 500 1.44m hexagonal segments for the primary mirror of each telescope. Both leading projects, the Thirty Meter Telescope (TMT) and the European Extremely Large Telescope (E-ELT), have set highly demanding technical requirements for each fabricated segment. These technical requirements, when combined with the anticipated construction schedule for each telescope, suggest that more than one optical fabricator will be involved in the delivery of the primary mirror segments in order to meet the project schedule. For one supplier, the technical specification is challenging and requires highly consistent control of metrology in close coordination with the polishing technologies used in order to optimize production rates. For production using multiple suppliers, however the supply chain is structured, consistent control of metrology along the supply chain will be required. This requires a broader pattern of independent verification than is the case of a single supplier. This paper outlines the metrology requirements for a single supplier throughout all stages of the fabrication process. We identify and outline those areas where metrology accuracy and duration have a significant impact on production efficiency. We use the challenging ESO E-ELT technical specification as an example of our treatment, including actual process data. We further develop this model for the case of a supply chain consisting of multiple suppliers. Here, we emphasize the need to control metrology throughout the supply chain in order to optimize net production efficiency.

  12. Hydrogen monitoring requirements in the global technical regulation on hydrogen and fuel cell vehicles

    DOE PAGES

    Buttner, William; Rivkin, C.; Burgess, R.; ...

    2017-02-04

    Here, the United Nations Economic Commission for Europe Global Technical Regulation (GTR) Number 13 ( Global Technical Regulation on Hydrogen and Fuel Cell Vehicles) is the defining document regulating safety requirements in hydrogen vehicles, and in particular, fuel cell electric vehicles (FCEVs). GTR Number 13 has been formally adopted and will serve as the basis for the national regulatory standards for FCEV safety in North America (led by the United States), Japan, Korea, and the European Union. The GTR defines safety requirements for these vehicles, including specifications on the allowable hydrogen levels in vehicle enclosures during in-use and post-crash conditionsmore » and on the allowable hydrogen emissions levels in vehicle exhaust during certain modes of normal operation. However, in order to be incorporated into national regulations, that is, to be legally binding, methods to verify compliance with the specific requirements must exist. In a collaborative program, the Sensor Laboratories at the National Renewable Energy Laboratory in the United States and the Joint Research Centre, Institute for Energy and Transport in the Netherlands have been evaluating and developing analytical methods that can be used to verify compliance with the hydrogen release requirements as specified in the GTR.« less

  13. Research on the technical requirements standards of high efficiency precipitator in power industries for assessment

    NASA Astrophysics Data System (ADS)

    Jin, Huang; Ling, Lin; Jun, Guo; Jianguo, Li; Yongzhong, Wang

    2017-11-01

    Facing the increasingly severe situation of air pollution, China are now positively promoting the evaluation of high efficiency air pollution control equipments and the research of the relative national standards. This paper showed the significance and the effect of formulating the technical requirements of high efficiency precipitator equipments for assessment national standards in power industries as well as the research thoughts and principle of these standards. It introduce the qualitative and quantitative evaluation requirements of high efficiency precipitators using in power industries and the core technical content such as testing, calculating, evaluation methods and so on. The implementation of a series of national standards is in order to lead and promote the production and application of high efficiency precipitator equipments in the field of the prevention of air pollution in national power industries.

  14. 78 FR 52963 - 60-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY...: HUD is seeking approval from the Office of Management and Budget (OMB) for the information collection... interested parties on the proposed collection of information. The purpose of this notice is to allow for 60...

  15. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  16. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  17. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  18. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  19. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  20. Space shuttle main engine: Interactive design challenges

    NASA Technical Reports Server (NTRS)

    Mccarty, J. P.; Wood, B. K.

    1985-01-01

    The operating requirements established by NASA for the SSME were considerably more demanding than those for earlier rocket engines used in the military launch vehicles or Apollo program. The SSME, in order to achieve the high performance, low weight, long life, reusable objectives, embodied technical demands far in excess of its predecessor rocket engines. The requirements dictated the use of high combustion pressure and the staged combustion cycle which maximizes performance through total use of all propellants in the main combustion process. This approach presented a myriad of technical challenges for maximization of performance within attainable state of the art capabilities for operating pressures, operating temperatures and rotating machinery efficiencies. Controlling uniformity of the high pressure turbomachinery turbine temperature environment was a key challenge for thrust level and life capability demanding innovative engineering. New approaches in the design of the components were necessary to accommodate the multiple use, minimum maintenance objectives. Included were the use of line replaceable units to facilitate field maintenance automatic checkout and internal inspection capabilities.

  1. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  2. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  3. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  4. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  5. 10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...

  6. 77 FR 19015 - Announcement of Requirements and Registration for Beat Down Blood Pressure Challenge

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Down Blood Pressure Challenge AGENCY: Office of the National Coordinator for Health Information... Register (77 FR 17060) announcing requirements and registration for a Beat Down Blood Pressure Video... you to visit http://BloodPressure.Challenge.gov for a complete set of rules and requirements for this...

  7. Robotic acquisition programs: technical and performance challenges

    NASA Astrophysics Data System (ADS)

    Thibadoux, Steven A.

    2002-07-01

    The Unmanned Ground Vehicles/ Systems Joint Project Office (UGV/S JPO) is developing and fielding a variety of tactical robotic systems for the Army and Marine Corps. The Standardized Robotic System (SRS) provides a family of common components that can be installed in existing military vehicles, to allow unmanned operation of the vehicle and its payloads. The Robotic Combat Support System (RCSS) will be a medium sized unmanned system with interchangeable attachments, allowing a remote operator to perform a variety of engineering tasks. The Gladiator Program is a USMC initiative for a small to medium sized, highly mobile UGV to conduct scout/ surveillance missions and to carry various lethal and non-lethal payloads. Acquisition plans for these programs require preplanned evolutionary block upgrades to add operational capability, as new technology becomes available. This paper discusses technical and performance issues that must be resolved and the enabling technologies needed for near term block upgrades of these first generation robotic systems. Additionally, two Joint Robotics Program (JRP) initiatives, Robotic Acquisition through Virtual Environments and Networked Simulations (RAVENS) and Joint Architecture for Unmanned Ground Systems (JAUGS), will be discussed. RAVENS and JAUGS will be used to efficiently evaluate and integrate new technologies to be incorporated in system upgrades.

  8. Total Quality Management (TQM) in Self-Financed Technical Institutions: A Quality Function Deployment (QFD) and Force Field Analysis Approach

    ERIC Educational Resources Information Center

    Thakkar, Jitesh; Deshmukh, S. G.; Shastree, Anil

    2006-01-01

    Purpose: To explore the potential for adoption of TQM in self-financed technical institutions in the light of new demands and challenges posed by customers/students and society. Design/methodology/approach: The paper presents use of quality function deployment (QFD) which prioritizes technical requirements and correlates them with various…

  9. Technical Requirements For Reactors To Be Deployed Internationally For the Global Nuclear Energy Partnership

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ingersoll, Daniel T

    2007-01-01

    Technical Requirements For Reactors To Be Deployed Internationally For the Global Nuclear Energy Partnership Robert Price U.S. Department of Energy, 1000 Independence Ave, SW, Washington, DC 20585, Daniel T. Ingersoll Oak Ridge National Laboratory, P.O. Box 2008, Oak Ridge, TN 37831-6162, INTRODUCTION The Global Nuclear Energy Partnership (GNEP) seeks to create an international regime to support large-scale growth in the worldwide use of nuclear energy. Fully meeting the GNEP vision may require the deployment of thousands of reactors in scores of countries, many of which do not use nuclear energy currently. Some of these needs will be met by large-scalemore » Generation III and III+ reactors (>1000 MWe) and Generation IV reactors when they are available. However, because many developing countries have small and immature electricity grids, the currently available Generation III(+) reactors may be unsuitable since they are too large, too expensive, and too complex. Therefore, GNEP envisions new types of reactors that must be developed for international deployment that are "right sized" for the developing countries and that are based on technologies, designs, and policies focused on reducing proliferation risk. The first step in developing such systems is the generation of technical requirements that will ensure that the systems meet both the GNEP policy goals and the power needs of the recipient countries. REQUIREMENTS Reactor systems deployed internationally within the GNEP context must meet a number of requirements similar to the safety, reliability, economics, and proliferation goals established for the DOE Generation IV program. Because of the emphasis on deployment to nonnuclear developing countries, the requirements will be weighted differently than with Generation IV, especially regarding safety and non-proliferation goals. Also, the reactors should be sized for market conditions in developing countries where energy demand per capita, institutional maturity

  10. Chemical and technical challenges in the analysis of central carbon metabolites by liquid-chromatography mass spectrometry.

    PubMed

    Siegel, David; Permentier, Hjalmar; Reijngoud, Dirk-Jan; Bischoff, Rainer

    2014-09-01

    This review deals with chemical and technical challenges in the analysis of small-molecule metabolites involved in central carbon and energy metabolism via liquid-chromatography mass-spectrometry (LC-MS). The covered analytes belong to the prominent pathways in biochemical carbon oxidation such as glycolysis or the tricarboxylic acid cycle and, for the most part, share unfavorable properties such as a high polarity, chemical instability or metal-affinity. The topic is introduced by selected examples on successful applications of metabolomics in the clinic. In the core part of the paper, the structural features of important analyte classes such as nucleotides, coenzyme A thioesters or carboxylic acids are linked to "problematic hotspots" along the analytical chain (sample preparation and-storage, separation and detection). We discuss these hotspots from a chemical point of view, covering issues such as analyte degradation or interactions with metals and other matrix components. Based on this understanding we propose solutions wherever available. A major notion derived from these considerations is that comprehensive carbon metabolomics inevitably requires multiple, complementary analytical approaches covering different chemical classes of metabolites. Copyright © 2013 Elsevier B.V. All rights reserved.

  11. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical Requirements for Class A Automatic Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Equipment Authorization for Compulsory Ships § 80.275...

  12. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices.

    PubMed

    Kraft, Marc

    2008-09-03

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority.

  13. Framework conditions and requirements to ensure the technical functional safety of reprocessed medical devices

    PubMed Central

    Kraft, Marc

    2008-01-01

    Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority. PMID:20204095

  14. New Safety and Technical Challenges and Operational Experience on the JET First Trace Tritium Experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pearce, R.J.H.; Bell, A.C.; Brennan, D.

    'Trace Tritium Experiments' (TTE) were successfully performed on JET in 2003. The Campaign marked the first use of tritium in JET plasmas since the Deuterium-Tritium Experiment (DTE1) Campaign in 1997, and was the first use of tritium in experiments under the EFDA organisation with the UKAEA as JET Operator. The safety and regulatory preparations for the experiment were extensive. Since JET has been operated by the UKAEA the operations have followed the model of a licensed nuclear site. The safe operation of the JET torus is demonstrated in a safety case. Key Safety Management Requirement (KSMR) and Key Safety Relatedmore » Equipment (KSRE) are identified in the Safety Case for DT operation. The safe operation of the torus is within the bounds of, and under the control of, an Authority to Operate (ATO). New technical challenges were presented by the need to inject and account for small quantities of tritium in very short pulses ({approx}80ms), with an accurate time stamp. The safety and operational management of the campaign are described. Valuable lessons were learned which would help in running future experiments. It is concluded that JET is in a strong position to run future trace tritium and full DT discharges.« less

  15. United States: challenges filed to anti-prostitution pledge requirement.

    PubMed

    Schleifer, Rebecca

    2005-12-01

    Two separate lawsuits were filed recently in US federal courts challenging a provision of US law requiring that non-governmental organizations have a policy "explicitly opposing prostitution" as a condition of receiving funding under the United States Leadership against HIV/AIDS, Tuberculosis, and Malaria Act of 2003 (US Global AIDS Act). US-based plaintiffs in both cases argue that the anti-prostitution pledge requirement in the Act violates US Constitutional guarantees of free speech and due process, and undermines proven, effective efforts to fight HIV/AIDS among sex workers.

  16. Transsphenoidal surgery in patients with acromegaly: operative strategies for overcoming technically challenging anatomical variations.

    PubMed

    Zada, Gabriel; Cavallo, Luigi M; Esposito, Felice; Fernandez-Jimenez, Julio Cesar; Tasiou, Anastasia; De Angelis, Michelangelo; Cafiero, Tullio; Cappabianca, Paolo; Laws, Edward R

    2010-10-01

    In addition to difficulties with anesthetic and medical management, transsphenoidal operations in patients with longstanding acromegaly are associated with inherent intraoperative challenges because of anatomical variations that occur frequently in these patients. The object of this study was to review the overall safety profile and anatomical/technical challenges associated with transsphenoidal surgery in patients with acromegaly. The authors performed a retrospective analysis of 169 patients who underwent endoscopic transsphenoidal operations for growth hormone-secreting adenomas to assess the incidence of surgical complications. A review of frequently occurring anatomical challenges and operative strategies employed during each phase of the operation to address these particular issues was performed. Of 169 cases reviewed, there was no perioperative mortality. Internal carotid artery injury occurred in 1 patient (0.6%) with complex sinus anatomy, who remained neurologically intact following endovascular unilateral carotid artery occlusion. Other complications included: significant postoperative epistaxis (5 patients [3%]), transient diabetes insipidus (5 patients [3%]), delayed symptomatic hyponatremia (4 patients [2%]), CSF leak (2 patients [1%]), and pancreatitis (1 patient [0.6%]). Preoperative considerations in patients with acromegaly should include a cardiopulmonary evaluation and planning regarding intubation and other aspects of the anesthetic technique. During the nasal phase of the transsphenoidal operation, primary challenges include maintaining adequate visualization and hemostasis, which is frequently compromised by redundant, edematous nasal mucosa and bony hypertrophy of the septum and the nasal turbinates. During the sphenoid phase, adequate bony removal, optimization of working space, and correlation of imaging studies to intraoperative anatomy are major priorities. The sellar phase is frequently challenged by increased sellar floor thickness

  17. Scope and Challenges of Technical Education: A Kerala Perspective

    ERIC Educational Resources Information Center

    Rahman, M. Abdul; Unnikrishnan, Ramesh

    2015-01-01

    Technical education contributes a major share to the overall education system and plays a vital role in the social and economic development of our nation. Since independence, the technical education system in our country has grown into a fairly large-sized system, offering opportunities for education and training in a wide variety of trades and…

  18. Zero Energy Schools: The Challenges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torcellini, Paul A

    School buildings have a lot of potential to achieve zero energy (ZE) in new construction as well as in retrofits. There are many examples of schools operating at ZE, and many technical resources available to guide school districts and their design and construction teams through the process. When school districts embark on the path to ZE, however, they often confront challenges related to processes and a perception that ZE buildings require 'new,' unconventional, and expensive technologies, materials, or equipment. Here are some of the challenges school districts and their design and construction teams commonly encounter, and the solutions they usemore » to overcome them.« less

  19. Emerging Water Contaminants: Technical, Legal and Policy Challenges

    NASA Astrophysics Data System (ADS)

    Deeb, R. A.; Kresic, N.; Laugier, M. C.; Kavanaugh, M. C.

    2002-12-01

    Approximately 120 new chemicals are created each year due to ever-improving industry and technology markets. Releases of new contaminants into the environment can occur during production, use and disposal of these chemicals thereby leading to potential contamination of water supply sources. Very few emerging contaminants are regulated. In addition, knowledge gaps regarding emerging contaminants include lack health effects, occurrence (either because these compounds are not measured or because concentrations are below detection limits of readily available analytical techniques) and fate and transport in the environment especially with regards to mobility and persistence. The sources of these compounds are numerous. One source is treated wastewater, which is re-injected into groundwater aquifers for indirect potable reuse purposes. Emerging compounds of concern can be classified in various classes. This presentation will focus on contaminants, which have emerged in the last 10 years including pharmaceuticals (antibiotics/drugs), personal care products (polycyclic musks), pesticides/herbicides, industrial solvents (1,4-dioxane), gasoline additives (MTBE), disinfection byproducts such as NDMA (N-nitrosodimethylamine), and inorganic compounds such as perchlorate and arsenic. This presentation will present technical, legal and legislative challenges posed by the presence of these contaminants in water. Background information including chemical's history of use, sources in the environments, nationwide occurrence, physical and chemical properties, behavior in the environment and technologies for removal from soil and water will be presented. In addition, case studies on MTBE, pharmaceuticals and personal care products, 1,4-dioxane, arsenic and NDMA will be discussed.

  20. Transesophageal echocardiography and intracardiac echocardiography differently predict potential technical challenges or failures of interatrial shunts catheter-based closure.

    PubMed

    Rigatelli, Gianluca; Rigateli, Gianluca; Cardaioli, Paolo; Braggion, Gabriele; Aggio, Silvio; Giordan, Massimo; Magro, Beatrice; Nascimben, Alberto; Favaro, Alberto; Roncon, Loris; Rincon, Loris

    2007-02-01

    We sought to prospectively assess the role of transesophageal (TEE) and intracardiac echocardiography (ICE) in detecting potential technical difficulties or failures in patients submitted to interatrial shunts percutaneous closure. We prospectively enrolled 46 consecutive patients (mean age 35+/-28, 8 years, 30 female) referred to our center for catheter-based closure of interatrial shunts. All patients were screened with TEE before the intervention. Patients who met the inclusion criteria underwent ICE study before the closure attempt (40 patients). TEE detected potential technical difficulties in 22.5% (9/40) patients, whereas ICE detected technical difficulties in 32.5% (13/40 patients). In patients with positive TEE/ICE the procedural success (92.4% versus 100% and, P = ns) and follow-up failure rate (7.7% versus 0%, P = ns) were similar to patients with negative TEE/ICE, whereas the fluoroscopy time (7 +/- 1.2 versus 5 +/- 0.7 minutes, P < 0.03), the procedural time (41 +/- 4.1 versus 30 +/- 8.2 minutes, P +/- 0.03), and technical difficulties rate (23.1% versus 0%, P = 0.013) were higher. Differences between ICE and TEE in the evaluation of rims, measurement of ASD or fossa ovalis, and detection of venous valve and embryonic septal membrane remnants impacted on technical challenges and on procedural and fluoroscopy times but did not influence the success rate and follow-up failure rate.

  1. 49 CFR 171.24 - Additional requirements for the use of the ICAO Technical Instructions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Additional requirements for the use of the ICAO... the United States by aircraft, and by motor vehicle or rail either before or after being transported by aircraft in accordance with the ICAO Technical Instructions (IBR, see § 171.7), as authorized in...

  2. In Translation: School Leaders Learning in and from Leadership Practice While Confronting Pressing Policy Challenges

    ERIC Educational Resources Information Center

    Drago-Severson, Eleanor; Maslin-Ostrowski, Patricia

    2018-01-01

    Background/Context: Worldwide, principals face enormous challenges while translating policies and mandates for which they are accountable into their mission and practice. While some of these school-level challenges are technical, many are adaptive (Heifetz), requiring leaders and those in their care to grow their cognitive and affective…

  3. Regulatory Requirements and Technical Analysis for Department of Energy Regulated Performance Assessments of Shallow-Trench Disposal of Low-Level Radioactive Waste at the Nevada Test Site

    NASA Astrophysics Data System (ADS)

    Crowe, B.; Black, P.; Tauxe, J.; Yucel, V.; Rawlinson, S.; Colarusso, A.; DiSanza, F.

    2001-12-01

    The National Nuclear Security Administration, Nevada Operations Office (NNSA/NV) operates and maintains two active facilities on the Nevada Test Site (NTS) that dispose Department of Energy (DOE) defense-generated low-level radioactive (LLW), mixed radioactive, and classified waste in shallow trenches, pits and large-diameter boreholes. The operation and maintenance of the LLW disposal sites are self-regulated under DOE Order 435.1, which requires review of a Performance Assessment for four performance objectives: 1) all pathways 25 mrem/yr limit; 2) atmospheric pathways 10 mrem/yr limit; 3) radon flux density of 20 pCi/m2/s; and 4) groundwater resource protection (Safe Drinking Water Act; 4 mrem/yr limit). The inadvertent human intruder is protected under a dual 500- and 100-mrem limit (acute and chronic exposure). In response to the Defense Nuclear Facilities Safety Board Recommendation 92 2, a composite analysis is required that must examine all interacting sources for compliance against both 30 and 100 mrem/yr limits. A small component of classified transuranic waste is buried at intermediate depths in 3-meter diameter boreholes at the Area 5 LLW disposal facility and is assessed through DOE-agreement against the requirements of the Environmental Protection Agency (EPA)'s 40 CFR 191. The hazardous components of mixed LLW are assessed against RCRA requirements. The NTS LLW sites fall directly under three sets of federal regulations and the regulatory differences result not only in organizational challenges, but also in different decision objectives and technical paths to completion. The DOE regulations require deterministic analysis for a 1,000-year compliance assessment supplemented by probabilistic analysis under a long-term maintenance program. The EPA regulations for TRU waste are probabilistically based for a compliance interval of 10,000 years. Multiple steps in the assessments are strongly dependent on assumptions for long-term land use policies

  4. Technical support for Life Sciences communities on a production grid infrastructure.

    PubMed

    Michel, Franck; Montagnat, Johan; Glatard, Tristan

    2012-01-01

    Production operation of large distributed computing infrastructures (DCI) still requires a lot of human intervention to reach acceptable quality of service. This may be achievable for scientific communities with solid IT support, but it remains a show-stopper for others. Some application execution environments are used to hide runtime technical issues from end users. But they mostly aim at fault-tolerance rather than incident resolution, and their operation still requires substantial manpower. A longer-term support activity is thus needed to ensure sustained quality of service for Virtual Organisations (VO). This paper describes how the biomed VO has addressed this challenge by setting up a technical support team. Its organisation, tooling, daily tasks, and procedures are described. Results are shown in terms of resource usage by end users, amount of reported incidents, and developed software tools. Based on our experience, we suggest ways to measure the impact of the technical support, perspectives to decrease its human cost and make it more community-specific.

  5. NASA In-Situ Resource Utilization Project-and Seals Challenges

    NASA Technical Reports Server (NTRS)

    Sacksteder, Kurt; Linne, Diane

    2006-01-01

    A viewgraph presentation on NASA's In-Situ Resource Utilization Project and Seals Challenges is shown. The topics include: 1) What Are Space Resources?; 2) Space Resource Utilization for Exploration; 3) ISRU Enables Affordable, Sustainable & Flexible Exploration; 4) Propellant from the Moon Could Revolutionize Space Transportation; 5) NASA ISRU Capability Roadmap Study, 2005; 6) Timeline for ISRU Capability Implementation; 7) Lunar ISRU Implementation Approach; 8) ISRU Technical-to-Mission Capability Roadmap; 9) ISRU Resources & Products of Interest; and 10) Challenging Seals Requirements for ISRU.

  6. Airborne Laser Remote Sensor for Oil Detection and Classification : Engineering Requirements and Technical Considerations Relevant to a Performance Specification

    DOT National Transportation Integrated Search

    1975-08-01

    This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...

  7. ERS technical standard on bronchial challenge testing: general considerations and performance of methacholine challenge tests.

    PubMed

    Coates, Allan L; Wanger, Jack; Cockcroft, Donald W; Culver, Bruce H; Diamant, Zuzana; Gauvreau, Gail; Hall, Graham L; Hallstrand, Teal S; Horvath, Ildiko; de Jongh, Frans H C; Joos, Guy; Kaminsky, David A; Laube, Beth L; Leuppi, Joerg D; Sterk, Peter J

    2017-05-01

    This international task force report updates general considerations for bronchial challenge testing and the performance of the methacholine challenge test. There are notable changes from prior recommendations in order to accommodate newer delivery devices. Rather than basing the test result upon a methacholine concentration (provocative concentration (PC 20 ) causing a 20% fall in forced expiratory volume in 1 s (FEV 1 )), the new recommendations base the result upon the delivered dose of methacholine causing a 20% fall in FEV 1 (provocative dose (PD 20 )). This end-point allows comparable results from different devices or protocols, thus any suitable nebuliser or dosimeter may be used, so long as the delivery characteristics are known. Inhalation may be by tidal breathing using a breath-actuated or continuous nebuliser for 1 min (or more), or by a dosimeter with a suitable breath count. Tests requiring maximal inhalations to total lung capacity are not recommended because the bronchoprotective effect of a deep breath reduces the sensitivity of the test. Copyright ©ERS 2017.

  8. Technical Desiderata for the Integration of Genomic Data into Electronic Health Records

    PubMed Central

    Masys, Daniel R.; Jarvik, Gail P.; Abernethy, Neil F.; Anderson, Nicholas R.; Papanicolaou, George J.; Paltoo, Dina N.; Hoffman, Mark A.; Kohane, Isaac S.; Levy, Howard P.

    2012-01-01

    The era of “Personalized Medicine,” guided by individual molecular variation in DNA, RNA, expressed proteins and other forms of high volume molecular data brings new requirements and challenges to the design and implementation of Electronic Health Records (EHRs). In this article we describe the characteristics of biomolecular data that differentiate it from other classes of data commonly found in EHRs, enumerate a set of technical desiderata for its management in healthcare settings, and offer a candidate technical approach to its compact and efficient representation in operational systems. PMID:22223081

  9. Integration Science and Technology of Silicon-Based Ceramics and Composites:Technical Challenges and Opportunities

    NASA Technical Reports Server (NTRS)

    Singh, M.

    2013-01-01

    Ceramic integration technologies enable hierarchical design and manufacturing of intricate ceramic and composite parts starting with geometrically simpler units that are subsequently joined to themselves and/or to metals to create components with progressively higher levels of complexity and functionality. However, for the development of robust and reliable integrated systems with optimum performance for high temperature applications, detailed understanding of various thermochemical and thermomechanical factors is critical. Different technical approaches are required for the integration of ceramic to ceramic and ceramic to metal systems. Active metal brazing, in particular, is a simple and cost-effective method to integrate ceramic to metallic components. Active braze alloys usually contain a reactive filler metal (e.g., Ti, Cr, V, Hf etc) that promotes wettability and spreading by inducing chemical reactions with the ceramics and composites. In this presentation, various examples of brazing of silicon nitride to themselves and to metallic systems are presented. Other examples of joining of ceramic composites (C/SiC and SiC/SiC) using ceramic interlayers and the resulting microstructures are also presented. Thermomechanical characterization of joints is presented for both types of systems. In addition, various challenges and opportunities in design, fabrication, and testing of integrated similar (ceramic-ceramic) and dissimilar (ceramic-metal) material systems will be discussed. Potential opportunities and need for the development of innovative design philosophies, approaches, and integrated system testing under simulated application conditions will also be presented.

  10. Technical Challenges in the Development of a NASA Synthetic Vision System Concept

    NASA Technical Reports Server (NTRS)

    Bailey, Randall E.; Parrish, Russell V.; Kramer, Lynda J.; Harrah, Steve; Arthur, J. J., III

    2002-01-01

    Within NASA's Aviation Safety Program, the Synthetic Vision Systems Project is developing display system concepts to improve pilot terrain/situation awareness by providing a perspective synthetic view of the outside world through an on-board database driven by precise aircraft positioning information updating via Global Positioning System-based data. This work is aimed at eliminating visibility-induced errors and low visibility conditions as a causal factor to civil aircraft accidents, as well as replicating the operational benefits of clear day flight operations regardless of the actual outside visibility condition. Synthetic vision research and development activities at NASA Langley Research Center are focused around a series of ground simulation and flight test experiments designed to evaluate, investigate, and assess the technology which can lead to operational and certified synthetic vision systems. The technical challenges that have been encountered and that are anticipated in this research and development activity are summarized.

  11. Current Technical Approaches for the Early Detection of Foodborne Pathogens: Challenges and Opportunities.

    PubMed

    Cho, Il-Hoon; Ku, Seockmo

    2017-09-30

    The development of novel and high-tech solutions for rapid, accurate, and non-laborious microbial detection methods is imperative to improve the global food supply. Such solutions have begun to address the need for microbial detection that is faster and more sensitive than existing methodologies (e.g., classic culture enrichment methods). Multiple reviews report the technical functions and structures of conventional microbial detection tools. These tools, used to detect pathogens in food and food homogenates, were designed via qualitative analysis methods. The inherent disadvantage of these analytical methods is the necessity for specimen preparation, which is a time-consuming process. While some literature describes the challenges and opportunities to overcome the technical issues related to food industry legal guidelines, there is a lack of reviews of the current trials to overcome technological limitations related to sample preparation and microbial detection via nano and micro technologies. In this review, we primarily explore current analytical technologies, including metallic and magnetic nanomaterials, optics, electrochemistry, and spectroscopy. These techniques rely on the early detection of pathogens via enhanced analytical sensitivity and specificity. In order to introduce the potential combination and comparative analysis of various advanced methods, we also reference a novel sample preparation protocol that uses microbial concentration and recovery technologies. This technology has the potential to expedite the pre-enrichment step that precedes the detection process.

  12. Teacher Collaborative Curriculum Design in Technical Vocational Colleges: A Strategy for Maintaining Curriculum Consistency?

    ERIC Educational Resources Information Center

    Albashiry, Nabeel M.; Voogt, Joke M.; Pieters, Jules M.

    2015-01-01

    The Technical Vocational Education and Training (TVET) curriculum requires continuous renewal and constant involvement of stakeholders in the redesign process. Due to a lack of curriculum design expertise, TVET institutions in developing contexts encounter challenges maintaining and advancing the quality and relevance of their programmes to the…

  13. From personal challenge to technical fix: the risks of depersonalised care.

    PubMed

    Reeve, Joanne; Lynch, Tom; Lloyd-Williams, Mari; Payne, Sheila

    2012-03-01

    Our research focuses on the complexity of needs associated with distress in people with advanced cancer. We have recently completed a large longitudinal survey exploring the interplay between a number of components of distress, including depression, demoralisation, debility and spirituality, amongst a cohort of people living with terminal cancer. Participants were recruited from 25 hospices across the Northwest of England between 2007-2009. A purposive subsample of 27 people was invited to take part in a qualitative interview to explore in greater depth their personal experiences of living with illness and related distress. Holistic-content analysis revealed two emerging themes: 'personal or personalised care' and 'expectations of truth and certainty'. We discuss these themes in the light of Illich's critique of health care as a 'technical response to a personal challenge'. We highlight the need for further work to explore the impact of organisation of care on personalised need and suggest looking to the chronic illness self-management literature for help in developing future palliative care approaches. © 2011 Blackwell Publishing Ltd.

  14. Replacing Technically Skilled Workers: Challenges and Suggestions

    ERIC Educational Resources Information Center

    Evanciew, Cheryl E. P.; Wither, Steven V.

    2004-01-01

    Throughout the early 1900s, the United States could either find technically skilled workers based upon their backgrounds or was able to train workers quickly. Farmers, military personnel, and other sources of skilled workers were available to fill the needs of the workforce. These sources of readily available skilled workers are no longer as…

  15. Single Cell and Metagenomic Assemblies: Biology Drives Technical Choices and Goals (Metagenomics Informatics Challenges Workshop: 10K Genomes at a Time)

    ScienceCinema

    Stepanauskas, Ramunas

    2018-02-06

    DOE JGI's Tanja Woyke, chair of the Single Cells and Metagenomes session, delivers an introduction, followed by Bigelow Laboratory's Ramunas Stepanauskas on "Single Cell and Metagenomic Assemblies: Biology Drives Technical Choices and Goals" at the Metagenomics Informatics Challenges Workshop held at the DOE JGI on October 12-13, 2011.

  16. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  17. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  18. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  19. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  20. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  1. The European Project Semester at ISEP: The Challenge of Educating Global Engineers

    ERIC Educational Resources Information Center

    Malheiro, Benedita; Silva, Manuel; Ribeiro, Maria Cristina; Guedes, Pedro; Ferreira, Paulo

    2015-01-01

    Current engineering education challenges require approaches that promote scientific, technical, design and complementary skills while fostering autonomy, innovation and responsibility. The European Project Semester (EPS) at Instituto Superior de Engenharia do Porto (ISEP) (EPS@ISEP) is a one semester project-based learning programme (30 European…

  2. Single-stage-to-orbit: Meeting the challenge

    NASA Astrophysics Data System (ADS)

    Freeman, Delma C., Jr.; Talay, Theodore A.; Austin, Robert Eugene

    1995-10-01

    There has been and continues to be significant discussion about the viability of fully reusable, single-stage-to-orbit (SSTO) concepts for delivery of payloads to orbit. Often, these discussions have focused in detail on performance and technology requirements relating to the technical feasibility of the concept, with only broad generalizations on how the SSTO will achieve its economic goals of greatly reduced vehicle ground and flight operations costs. With the current industry and NASA Reusable Launch Vehicle Technology Program efforts underway to mature and demonstrate technologies leading to a viable commercial launch system that also satisfies national needs, achieving acceptable recurring costs becomes a significant challenge. This paper reviews the current status of the Reusable Launch Vehicle Technology Program including the DC-XA, X-33, and X-34 flight systems and associated technology programs. The paper also examines lessons learned from the recently completed DC-X reusable rocket demonstrator program. It examines how these technologies and flight systems address the technical and operability challenges of SSTO whose solutions are necessary to reduce costs. The paper also discusses the management and operational approaches that address the challenge of a new cost-effective, reusable launch vehicle system.

  3. The Challenge of Fulfilling a Perplexing Space Weather User Requirement

    NASA Astrophysics Data System (ADS)

    Kunches, J. M.; Boteler, D.; Wang, H.

    2006-12-01

    To fly commercial aircraft over the poles, it is necessary to ensure that air-ground and air-air communications be maintained throughout the flight. Some U. S. carriers have requested a seven hour lead-time for predictions of HF outages, the primary communication means for flying over the pole. This very difficult-to-meet specification results from the necessity to make alternative fueling arrangements, schedule additional flight crews, modify the loading of the aircraft, etc., to minimize the costs due to redirecting aircraft away from the optimal polar route. To satisfy this stringent requirement, better predictions of solar energetic particle (SEPs) events are necessary. Even soft SEPs can cause HF outages lasting for hours. This requirement challenges the international science community to significantly improve current predictive methodologies. Presently, a 1-2 hour lead-time may be the longest that can be obtained with a reasonable false alarm rate. Globally, there are a number of new programs, organized under the auspices of the International Space Environment Service (ISES), to facilitate progress in meeting the airlines' requirement. The Regional Warning Center in Canada is implementing a network of riometers at high latitudes, so to detect ionospheric conditions that result in HF outages. This chain is now being deployed. The Regional Warning Centers in Russia, China, the United States and Japan are working with the Canadians, to acquire and make available, other real-time data relevant to the problem. These data include solar, interplanetary, geomagnetic and ionospheric data. Clearly this challenge spans the realm of space science, from the solar and galactic origins of energetic particles, to the D-Region of Earth's ionosphere. The presentation will lay out a roadmap for an iterative solution to the prediction challenge, and identify some of the key areas to be addressed.

  4. Transplantation of Bioprinted Tissues and Organs: Technical and Clinical Challenges and Future Perspectives.

    PubMed

    Ravnic, Dino J; Leberfinger, Ashley N; Koduru, Srinivas V; Hospodiuk, Monika; Moncal, Kazim K; Datta, Pallab; Dey, Madhuri; Rizk, Elias; Ozbolat, Ibrahim T

    2017-07-01

    : Three-dimensional (3D) bioprinting is a revolutionary technology in building living tissues and organs with precise anatomic control and cellular composition. Despite the great progress in bioprinting research, there has yet to be any clinical translation due to current limitations in building human-scale constructs, which are vascularized and readily implantable. In this article, we review the current limitations and challenges in 3D bioprinting, including in situ techniques, which are one of several clinical translational models to facilitate the application of this technology from bench to bedside. A detailed discussion is made on the technical barriers in the fabrication of scalable constructs that are vascularized, autologous, functional, implantable, cost-effective, and ethically feasible. Clinical considerations for implantable bioprinted tissues are further expounded toward the correction of end-stage organ dysfunction and composite tissue deficits.

  5. The Scientific Value and Technical Challenge of Chang'E-4 Landing on the Far-side of the Moon

    NASA Astrophysics Data System (ADS)

    Li, Fei; Zhang, He; Wu, Xueying; Ma, Jinan; Zhou, Wenyan

    2016-07-01

    The mission of Chang'E-4 probe is landing on the far-side of the moon for the first time in human history. Compared with the near-side, far-side landing has unique scientific value and more challenging technology implementation. The scientific significance of the exploration of far-side of the moon and the technical difficulties and solution approach of the Chang'E-4 were discussed in this paper. In science, the far-side of the Moon is an ideal scientific platform in that it is shielded from terrestrial radio-frequency interference. The terrane that records the formation of the primordial crust is located largely on the far-side hemisphere, and there is the largest and oldest recognized impact basin in our Solar System, the South Pole-Aitken basin. In technology, the difficulties mainly includes the analysis of the influence of lunar topography of far-side on the landing descent strategy, the study of relay orbit and operating modes for the relay satellite in the Earth-Moon L2(Lagrange point 2), and the requirement analysis of autonomous management due to the relay communication. It will provide the reference for landing exploration of the far-side of the moon.

  6. Breeding next generation tree fruits: technical and legal challenges

    PubMed Central

    Dalla Costa, Lorenza; Malnoy, Mickael; Gribaudo, Ivana

    2017-01-01

    The new plant breeding technologies (NPBTs) have recently emerged as powerful tools in the context of ‘green’ biotechnologies. They have wide potential compared to classical genetic engineering and they are attracting the interest of politicians, stakeholders and citizens due to the revolutionary impact they may have on agriculture. Cisgenesis and genome editing potentially allow to obtain pathogen-resistant plants or plants with enhanced qualitative traits by introducing or disrupting specific genes in shorter times compared to traditional breeding programs and by means of minimal modifications in the plant genome. Grapevine, the most important fruit crop in the world from an economical point of view, is a peculiar case for NPBTs because of the load of cultural aspects, varietal traditions and consumer demands, which hinder the use of classical breeding techniques and, furthermore, the application of genetic engineering to wine grape cultivars. Here we explore the technical challenges which may hamper the application of cisgenesis and genome editing to this perennial plant, in particular focusing on the bottlenecks of the Agrobacterium-mediated gene transfer. In addition, strategies to eliminate undesired sequences from the genome and to choose proper target sites are discussed in light of peculiar features of this species. Furthermore is reported an update of the international legislative frameworks regulating NPBT products which shows conflicting positions and, in the case of the European Union, a prolonged lack of regulation. PMID:29238598

  7. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  8. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  9. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  10. 16 CFR 1404.4 - Requirements to provide performance and technical data by labeling-Notice to purchasers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...

  11. [Implementation of the technical requirements of the UNE-EN-ISO 15189 quality standard in a mycobacterial laboratory].

    PubMed

    Guna Serrano, M del Remedio; Ocete Mochón, M Dolores; Lahiguera, M José; Bresó, M Carmen; Gimeno Cardona, Concepción

    2013-02-01

    The UNE-EN-ISO 15189:2007 standard defines the requirements for quality and competence that must be met by medical laboratories. These laboratories should use this international standard to develop their own quality management systems and to evaluate their own competencies; in turn, this standard will be used by accreditation bodies to confirm or recognize the laboratories' competence. In clinical microbiology laboratories, application of the standard implies the implementation of the technical and specific management requirements that must be met to achieve optimal quality when carrying out microbiological tests. In Spain, accreditation is granted by the Spanish Accreditation Body (Entidad Nacional de Acreditación). This review aims to discuss the practical application of the standard's technical requirements in mycobacterial laboratory. Firstly, we define the scope of accreditation. Secondly, we specify how the items of the standard on personnel management, control of equipment, environmental facilities, method validation, internal controls and customer satisfaction surveys were developed and implemented in our laboratory. Copyright © 2013 Elsevier España, S.L. All rights reserved.

  12. Technical and Vocational Education in Nigeria: Issues, Challenges and a Way Forward

    ERIC Educational Resources Information Center

    Okoye, Reko; Arimonu, Maxwell Onyenwe

    2016-01-01

    Technical education, as enshrined in the Nigerian national policy on education, is concerned with qualitative technological human resources development directed towards a national pool of skilled and self reliant craftsmen, technicians and technologists in technical and vocational education fields. In Nigeria, the training of technical personnel…

  13. Hybrid imaging worldwide-challenges and opportunities for the developing world: a report of a Technical Meeting organized by IAEA.

    PubMed

    Kashyap, Ravi; Dondi, Maurizio; Paez, Diana; Mariani, Guliano

    2013-05-01

    The growth in nuclear medicine, in the past decade, is largely due to hybrid imaging, specifically single-photon emission tomography-computed tomography (SPECT-CT) and positron emission tomography-computed tomography (PET-CT). Introduction and use of hybrid imaging has been growing at a fast pace. This has led to many challenges and opportunities to the personnel dealing with it. The International Atomic Energy Agency (IAEA) keeps a close watch on the trends in applications of nuclear techniques in health by many ways, including obtaining inputs from member states and professional societies. In 2012, a Technical Meeting on trends in hybrid imaging was organized by IAEA to understand the current status and trends of hybrid imaging using nuclear techniques, its role in clinical practice, and associated educational needs and challenges. Perspective of scientific societies and professionals from all the regions of the world was obtained. Heterogeneity in value, educational needs, and access was noted and the drivers of this heterogeneity were discussed. This article presents the key points shared during the technical meeting, focusing primarily on SPECT-CT and PET-CT, and shares the action plan for IAEA to deal with heterogeneity as suggested by the participants. Copyright © 2013 Elsevier Inc. All rights reserved.

  14. Estimation of Managerial and Technical Personnel Requirements in Selected Industries. Training for Industry Series, No. 2.

    ERIC Educational Resources Information Center

    United Nations Industrial Development Organization, Vienna (Austria).

    The need to develop managerial and technical personnel in the cement, fertilizer, pulp and paper, sugar, leather and shoe, glass, and metal processing industries of various nations was studied, with emphasis on necessary steps in developing nations to relate occupational requirements to technology, processes, and scale of output. Estimates were…

  15. Consensus statement for use and technical requirements of thyroid ultrasound in endocrinology units.

    PubMed

    Martín-Hernández, Tomás; Díez Gómez, Juan José; Díaz-Soto, Gonzalo; Torres Cuadro, Alberto; Navarro González, Elena; Oleaga Alday, Amelia; Sambo Salas, Marcel; Reverter Calatayud, Jordi L; Argüelles Jiménez, Iñaki; Mancha Doblas, Isabel; Fernández García, Diego; Galofré, Juan Carlos

    2017-03-01

    Thyroid nodule detection has increased with widespread use of ultrasound, which is currently the main tool for detection, monitoring, diagnosis and, in some instances, treatment of thyroid nodules. Knowledge of ultrasound and adequate instruction on its use require a position statement by the scientific societies concerned. The working groups on thyroid cancer and ultrasound techniques of the Spanish Society of Endocrinology and Nutrition have promoted this document, based on a thorough analysis of the current literature, the results of multicenter studies and expert consensus, in order to set the requirements for the best use of ultrasound in clinical practice. The objectives include the adequate framework for use of thyroid ultrasound, the technical and legal requirements, the clinical situations in which it is recommended, the levels of knowledge and learning processes, the associated responsibility, and the establishment of a standardized reporting of results and integration into hospital information systems and endocrinology units. Copyright © 2017 SEEN. Publicado por Elsevier España, S.L.U. All rights reserved.

  16. Conceptual design of a moving belt radiator shuttle-attached experiments: Technical requirement Document

    NASA Technical Reports Server (NTRS)

    Aguilar, Jerry L.

    1989-01-01

    The technical requirements for a shuttle-attached Moving Belt Radiator (MBR) experiment are defined. The MBR is an advanced radiator concept in which a rotating belt radiates thermal energy to space. The requirements for integrating the MBR experiment in the shuttle bay are discussed. Requirements for the belt material and working fluid are outlined along with some possible options. The proposed size and relationship to a full scale Moving Belt Radiator are defined. The experiment is defined with the primary goal of dynamic testing and a secondary goal of demonstrating the sealing and heat transfer characteristics. A perturbation system which will simulate a docking maneuver or other type of short term acceleration is proposed for inclusion in the experimental apparatus. A deployment and retraction capability which will aid in evaluating the dynamics of a belt during such a maneuver is also described. The proposed test sequence for the experiment is presented. Details of the conceptual design are not presented herein, but rather in a separate Final Report.

  17. Technical Efficiency of Hospitals in Tehran, Iran.

    PubMed

    Kakeman, Edris; Rahimi Forushani, Abbas; Dargahi, Hossein

    2016-04-01

    Nowadays, restriction on access and optimum use of resources is the main challenge of development in all organizations. Therefore, the aim of this study was to determine the technical efficiency and its factors, influencing hospitals of Tehran. This research was a descriptive-analytical and retrospective study conducted in 2014-2015. Fifty two hospitals with public, private, and social security ownership type were selected for this study. The required data was collected by a researcher-made check list in 3 sections of background data, inputs and outputs. The data was analyzed by DEAP 1.0.2, and STATA-13 technique. Seventeen (31/48) of hospitals had the efficiency score of 1 as the highest technical efficiency. The highest average score of efficiency was related to social security hospitals as 84.32, and then the public and private hospitals with the average of 84.29 and 79.64 respectively. Tobit regression results showed that the size, type of practice, and ownership of hospitals were effective on the degree of their technical efficiency. However, there was no significant correlation between teaching / non-teaching hospitals with technical efficiency. Establishment of competition system among hospitals, constitution of medium size hospitals and allocation of budget to hospitals based on national accreditation system are recommended.

  18. Single-stage-to-orbit — Meeting the challenge

    NASA Astrophysics Data System (ADS)

    Freeman, Delma C.; Talay, Theodore A.; Austin, Robert Eugene

    1996-02-01

    There has been and continues to be significant discussion about the viability of fully reusable, single-stage-to-orbit (SSTO) concepts for delivery of payloads to orbit. Often, these discussions have focused in detail on performance and technology requirements relating to the technical feasibility of the concept, with only broad generalizations on how the SSTO will achieve its economic goals of greatly reduced vehicle ground and flight operations costs. With the current industry and NASA Reusable Launch Vehicle Technology Program efforts underway to mature and demonstrate technologies leading to a viable commercial launch system that also satisfies national needs, achieving acceptable recurring costs becomes a significant challenge. This paper reviews the current status of the Reusable Launch Vehicle Technology Program including the DC-XA, X-33, X-34 flight systems and associated technology programs. The paper also examines lessons learned from the recently completed DC-X reusable rocket demonstrator program. It examines how these technologies and flight systems address the technical and operability challenges of SSTO whose solutions are necessary to reduce costs. The paper also discusses the management and operational approaches that address the challenge of a new cost-effective, reusable launch vehicle system.

  19. The Future Cybersecurity Workforce: Going Beyond Technical Skills for Successful Cyber Performance

    PubMed Central

    Dawson, Jessica; Thomson, Robert

    2018-01-01

    One of the challenges in writing an article reviewing the current state of cyber education and workforce development is that there is a paucity of quantitative assessment regarding the cognitive aptitudes, work roles, or team organization required by cybersecurity professionals to be successful. In this review, we argue that the people who operate within the cyber domain need a combination of technical skills, domain specific knowledge, and social intelligence to be successful. They, like the networks they operate, must also be reliable, trustworthy, and resilient. Defining the knowledge, skills, attributes, and other characteristics is not as simple as defining a group of technical skills that people can be trained on; the complexity of the cyber domain makes this a unique challenge. There has been little research devoted to exactly what attributes individuals in the cyber domain need. What research does exist places an emphasis on technical and engineering skills while discounting the important social and organizational influences that dictate success or failure in everyday settings. This paper reviews the literature on cyber expertise and cyber workforce development to identify gaps and then argues for the important contribution of social fit in the highly complex and heterogenous cyber workforce. We then identify six assumptions for the future of cybersecurity workforce development, including the requirement for systemic thinkers, team players, a love for continued learning, strong communication ability, a sense of civic duty, and a blend of technical and social skill. Finally, we make recommendations for social and cognitive metrics which may be indicative of future performance in cyber work roles to provide a roadmap for future scholars. PMID:29946276

  20. The Future Cybersecurity Workforce: Going Beyond Technical Skills for Successful Cyber Performance.

    PubMed

    Dawson, Jessica; Thomson, Robert

    2018-01-01

    One of the challenges in writing an article reviewing the current state of cyber education and workforce development is that there is a paucity of quantitative assessment regarding the cognitive aptitudes, work roles, or team organization required by cybersecurity professionals to be successful. In this review, we argue that the people who operate within the cyber domain need a combination of technical skills, domain specific knowledge, and social intelligence to be successful. They, like the networks they operate, must also be reliable, trustworthy, and resilient. Defining the knowledge, skills, attributes, and other characteristics is not as simple as defining a group of technical skills that people can be trained on; the complexity of the cyber domain makes this a unique challenge. There has been little research devoted to exactly what attributes individuals in the cyber domain need. What research does exist places an emphasis on technical and engineering skills while discounting the important social and organizational influences that dictate success or failure in everyday settings. This paper reviews the literature on cyber expertise and cyber workforce development to identify gaps and then argues for the important contribution of social fit in the highly complex and heterogenous cyber workforce. We then identify six assumptions for the future of cybersecurity workforce development, including the requirement for systemic thinkers, team players, a love for continued learning, strong communication ability, a sense of civic duty, and a blend of technical and social skill. Finally, we make recommendations for social and cognitive metrics which may be indicative of future performance in cyber work roles to provide a roadmap for future scholars.

  1. Challenges of Integrating NASA's Space Communications Networks

    NASA Technical Reports Server (NTRS)

    Reinert, Jessica; Barnes, Patrick

    2013-01-01

    The transition to new technology, innovative ideas, and resistance to change is something that every industry experiences. Recent examples of this shift are changing to using robots in the assembly line construction of automobiles or the increasing use of robotics for medical procedures. Most often this is done with cost-reduction in mind, though ease of use for the customer is also a driver. All industries experience the push to increase efficiency of their systems; National Aeronautics and Space Administration (NASA) and the commercial space industry are no different. NASA space communication services are provided by three separately designed, developed, maintained, and operated communications networks known as the Deep Space Network (DSN), Near Earth Network (NEN) and Space Network (SN). The Space Communications and Navigation (SCaN) Program is pursuing integration of these networks and has performed a variety of architecture trade studies to determine what integration options would be the most effective in achieving a unified user mission support organization, and increase the use of common operational equipment and processes. The integration of multiple, legacy organizations and existing systems has challenges ranging from technical to cultural. The existing networks are the progeny of the very first communication and tracking capabilities implemented by NASA and the Jet Propulsion Laboratory (JPL) more than 50 years ago and have been customized to the needs of their respective user mission base. The technical challenges to integrating the networks are many, though not impossible to overcome. The three distinct networks provide the same types of services, with customizable data rates, bandwidth, frequencies, and so forth. The differences across the networks have occurred in effort to satisfy their user missions' needs. Each new requirement has made the networks more unique and harder to integrate. The cultural challenges, however, have proven to be a

  2. Challenges of Integrating NASAs Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Reinert, Jessica M.; Barnes, Patrick

    2013-01-01

    The transition to new technology, innovative ideas, and resistance to change is something that every industry experiences. Recent examples of this shift are changing to using robots in the assembly line construction of automobiles or the increasing use of robotics for medical procedures. Most often this is done with cost-reduction in mind, though ease of use for the customer is also a driver. All industries experience the push to increase efficiency of their systems; National Aeronautics and Space Administration (NASA) and the commercial space industry are no different. NASA space communication services are provided by three separately designed, developed, maintained, and operated communications networks known as the Deep Space Network (DSN), Near Earth Network (NEN) and Space Network (SN). The Space Communications and Navigation (SCaN) Program is pursuing integration of these networks and has performed a variety of architecture trade studies to determine what integration options would be the most effective in achieving a unified user mission support organization, and increase the use of common operational equipment and processes. The integration of multiple, legacy organizations and existing systems has challenges ranging from technical to cultural. The existing networks are the progeny of the very first communication and tracking capabilities implemented by NASA and the Jet Propulsion Laboratory (JPL) more than 50 years ago and have been customized to the needs of their respective user mission base. The technical challenges to integrating the networks are many, though not impossible to overcome. The three distinct networks provide the same types of services, with customizable data rates, bandwidth, frequencies, and so forth. The differences across the networks have occurred in effort to satisfy their user missions' needs. Each new requirement has made the networks more unique and harder to integrate. The cultural challenges, however, have proven to be a

  3. Astronomy Instruction at a Two-year Technical College

    NASA Astrophysics Data System (ADS)

    Sirola, C. J.

    2000-12-01

    Over half of all students now begin their college careers at two-year institutions (technical colleges, junior colleges, vocational schools, etc.). This shift in student demographics has broad implications for college-level science instruction, including astronomy instruction. We compare astronomy instruction at two-year institutions to that at traditional four-year universities. A typical two-year school like Tri-County Technical College profers challenges not typically faced by research universities such as lack of research funding, little equipment or facilities, and a generally lower level of student ability. Conversely, a Tri-County Tech offers opportunities such as extensive training in teaching methodologies, a wide range of student demographics, and small classroom sizes. Our students are rarely interested in astronomy as a major, but instead take astronomy to fulfill other major requirements or to ensure the transfer of science credits to four-year universities. We present several examples of astronomy instruction at Tri-County Technical College and discuss our philosophy of teaching in a post-secondary environment whose enrollment is on the rise.

  4. A citrus waste-based biorefinery as a source of renewable energy: technical advances and analysis of engineering challenges.

    PubMed

    Rivas-Cantu, Raul C; Jones, Kim D; Mills, Patrick L

    2013-04-01

    An assessment of recent technical advances on pretreatment processes and its effects on enzymatic hydrolysis as the main steps of a proposed citrus processing waste (CPW) biorefinery is presented. Engineering challenges and relevant gaps in scientific and technical information for reliable design, modeling and scale up of a CPW biorefinery are also discussed. Some integrated physico-chemical pretreatments are proposed for testing for CPW, including high speed knife-grinding and simultaneous caustic addition. These new proposed processes and the effect of parameters such as particle size, surface area and morphology, pore volume and chemical composition of the diverse fractions resulting from pretreatment and enzymatic hydrolysis need to be evaluated and compared for pretreated and untreated samples of grapefruit processing waste. This assessment suggests the potential for filling the data gaps, and preliminary results demonstrate that the reduction of particle size and the increased surface area for the CPW will result in higher reaction rates and monosaccharide yields for the pretreated waste material.

  5. TADS and Technical Assistance.

    ERIC Educational Resources Information Center

    Trohanis, Pascal L.

    1983-01-01

    Accomplishments of the Technical Assistance Development System (TADS) are cited, current challenges (including program development, and communication and coordination) are noted, and the mission mandated for TADS is outlined. (CL)

  6. Constraints Militating against the Implementation of Production/Service Work in Technical Colleges in North Central Nigeria

    ERIC Educational Resources Information Center

    Agu, Peter A.

    2016-01-01

    Skill acquisition is a critical component of any vocational technical training program. When this component is missing or falls below expectation, it tends to defeat the objectives of the program. In Nigeria, many skill-oriented schools experience great challenges in trying to provide for the necessary facilities required for effective technical…

  7. Endoscopic and keyhole endoscope-assisted neurosurgical approaches: a qualitative survey on technical challenges and technological solutions.

    PubMed

    Marcus, Hani J; Cundy, Thomas P; Hughes-Hallett, Archie; Yang, Guang-Zhong; Darzi, Ara; Nandi, Dipankar

    2014-10-01

    The literature reflects a resurgence of interest in endoscopic and keyhole endoscope-assisted neurosurgical approaches as alternatives to conventional microsurgical approaches in carefully selected cases. The aim of this study was to assess the technical challenges of neuroendoscopy, and the scope for technological innovations to overcome these barriers. All full members of the Society of British Neurosurgeons (SBNS) were electronically invited to participate in an online survey. The open-ended structured survey asked three questions; firstly, whether the surgeon presently utilises or has experience with endoscopic or endoscope-assisted approaches; secondly, what they consider to be the major technical barriers to adopting such approaches; and thirdly, what technological advances they foresee improving safety and efficacy in the field. Responses were subjected to a qualitative research method of multi-rater emergent theme analysis. Three clear themes emerged: 1) surgical approach and better integration with image-guidance systems (20%), 2) intra-operative visualisation and improvements in neuroendoscopy (49%), and 3) surgical manipulation and improvements in instruments (74%). The analysis of responses to our open-ended survey revealed that although opinion was varied three major themes could be identified. Emerging technological advances such as augmented reality, high-definition stereo-endoscopy, and robotic joint-wristed instruments may help overcome the technical difficulties associated with neuroendoscopic approaches. Results of this qualitative survey provide consensus amongst the technology end-user community such that unambiguous goals and priorities may be defined. Systems integrating these advances could improve the safety and efficacy of endoscopic and endoscope-assisted neurosurgical approaches.

  8. Endoscopic and Keyhole Endoscope-assisted Neurosurgical Approaches: A Qualitative Survey on Technical Challenges and Technological Solutions

    PubMed Central

    Marcus, Hani J; Cundy, Thomas P; Hughes-Hallett, Archie; Yang, Guang-Zhong; Darzi, Ara; Nandi, Dipankar

    2014-01-01

    Introduction The literature reflects a resurgence of interest in endoscopic and keyhole endoscope-assisted neurosurgical approaches as alternatives to conventional microsurgical approaches in carefully selected cases. The aim of this study was to assess the technical challenges of neuroendoscopy, and the scope for technological innovations to overcome these barriers. Materials and Methods All full members of the Society of British Neurosurgeons (SBNS) were electronically invited to participate in an online survey. The open-ended structured survey asked three questions; firstly, whether the surgeon presently utilises or has experience with endoscopic or endoscope-assisted approaches; secondly, what they consider to be the major technical barriers to adopting such approaches; and thirdly, what technological advances they foresee improving safety and efficacy in the field. Responses were subjected to a qualitative research method of multi-rater emergent themes analysis. Results Three clear themes emerged: 1) surgical approach and better integration with image-guidance systems (20%), 2) intra-operative visualisation and improvements in neuroendoscopy (49%), and 3) surgical manipulation and improvements in instruments (74%). Discussion The analysis of responses to our open-ended survey revealed that although opinion was varied three major themes could be identified. Emerging technological advances such as augmented reality, high-definition stereo-endoscopy, and robotic joint-wristed instruments may help overcome the technical difficulties associated with neuroendoscopic approaches. Conclusions Results of this qualitative survey provide consensus amongst the technology end-user community such that unambiguous goals and priorities may be defined. Systems integrating these advances could improve the safety and efficacy of endoscopic and endoscope-assisted neurosurgical approaches. PMID:24533591

  9. Percutaneous Image-Guided Cryoablation of Challenging Mediastinal Lesions Using Large-Volume Hydrodissection: Technical Considerations and Outcomes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garnon, Julien, E-mail: juliengarnon@gmail.com; Koch, Guillaume, E-mail: Guillaume.koch@gmail.com; Caudrelier, Jean, E-mail: caudjean@yahoo.fr

    ObjectiveThis study was designed to describe the technique of percutaneous image-guided cryoablation with large-volume hydrodissection for the treatment of challenging mediastinal lesions.MethodsBetween March 2014 and June 2015, three patients (mean age 62.7 years) with four neoplastic anterior mediastinal lesions underwent five cryoablation procedures using large-volume hydrodissection. Procedures were performed under general anaesthesia using CT guidance. Lesion characteristics, hydrodissection and cryoablation data, technical success, complications, and clinical outcomes were assessed using retrospective chart review.ResultsLesions (mean size 2.7 cm; range 2–4.3 cm) were in contact with great vessels (n = 13), trachea (n = 3), and mediastinal nerves (n = 6). Hydrodissection was performed intercostally (n = 4), suprasternally (n = 2), transsternally (n = 1), ormore » via the sternoclavicular joint (n = 1) using 1–3 spinal needles over 13.4 (range 7–26) minutes; 450 ml of dilute contrast was injected (range 300–600 ml) and increased mean lesion-collateral structure distance from 1.9 to 7.7 mm. Vulnerable mediastinal nerves were identified in four of five procedures. Technical success was 100 %, with one immediate complication (recurrent laryngeal nerve injury). Mean follow-up period was 15 months. One lesion demonstrated residual disease on restaging PET-CT and was retreated to achieve complete ablation. At last follow-up, two patients remained disease-free, and one patient developed distant disease after 1 year without local recurrence.ConclusionsCryoablation using large-volume hydrodissection is a feasible technique, enabling safe and effective treatment of challenging mediastinal lesions.« less

  10. A large-scale mass casualty simulation to develop the non-technical skills medical students require for collaborative teamwork.

    PubMed

    Jorm, Christine; Roberts, Chris; Lim, Renee; Roper, Josephine; Skinner, Clare; Robertson, Jeremy; Gentilcore, Stacey; Osomanski, Adam

    2016-03-08

    There is little research on large-scale complex health care simulations designed to facilitate student learning of non-technical skills in a team-working environment. We evaluated the acceptability and effectiveness of a novel natural disaster simulation that enabled medical students to demonstrate their achievement of the non-technical skills of collaboration, negotiation and communication. In a mixed methods approach, survey data were available from 117 students and a thematic analysis undertaken of both student qualitative comments and tutor observer participation data. Ninety three per cent of students found the activity engaging for their learning. Three themes emerged from the qualitative data: the impact of fidelity on student learning, reflexivity on the importance of non-technical skills in clinical care, and opportunities for collaborative teamwork. Physical fidelity was sufficient for good levels of student engagement, as was sociological fidelity. We demonstrated the effectiveness of the simulation in allowing students to reflect upon and evidence their acquisition of skills in collaboration, negotiation and communication, as well as situational awareness and attending to their emotions. Students readily identified emerging learning opportunities though critical reflection. The scenarios challenged students to work together collaboratively to solve clinical problems, using a range of resources including interacting with clinical experts. A large class teaching activity, framed as a simulation of a natural disaster is an acceptable and effective activity for medical students to develop the non-technical skills of collaboration, negotiation and communication, which are essential to team working. The design could be of value in medical schools in disaster prone areas, including within low resource countries, and as a feasible intervention for learning the non-technical skills that are needed for patient safety.

  11. 77 FR 36958 - Proposed Requirements-Race to the Top-Early Learning Challenge; Phase 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... DEPARTMENT OF EDUCATION 34 CFR Chapter II DEPARTMENT OF HEALTH AND HUMAN SERVICES 45 CFR Subtitle... Requirements--Race to the Top--Early Learning Challenge; Phase 2 AGENCY: Department of Education and Department of Health and Human Services. ACTION: Proposed requirements. SUMMARY: The Secretary of Education and...

  12. Challenges in Archetypes Terminology Binding Using SNOMED-CT Compositional Grammar: The Norwegian Patient Summary Case.

    PubMed

    Marco-Ruiz, Luis; Pedersen, Rune

    2017-01-01

    In order to cover the requirements for interoperability in the Norwegian context, we studied the terminology binding of archetypes to terminology expressions created with the SNOMED-CT compositional grammar. As a result we identified important challenges categorized as technical, expressivity, human, and models mismatch.

  13. Challenges and Opportunities: Two Weeks of Teaching Technical Communication at Suzhou University, China.

    ERIC Educational Resources Information Center

    Ding, Daniel; Jablonski, John

    2001-01-01

    Relates the authors' experience teaching technical writing for two weeks at Suzhou University in China. Discusses activities; examines four technical writing textbooks purchased there; and offers suggestions about how technical communication might be established as a separate academic discipline in Chinese universities. Discusses technical…

  14. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  15. 1996 DOE technical standards program workshop: Proceedings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The workshop theme is `The Strategic Standardization Initiative - A Technology Exchange and Global Competitiveness Challenge for DOE.` The workshop goal is to inform the DOE technical standards community of strategic standardization activities taking place in the Department, other Government agencies, standards developing organizations, and industry. Individuals working on technical standards will be challenged to improve cooperation and communications with the involved organizations in response to the initiative. Workshop sessions include presentations by representatives from various Government agencies that focus on coordination among and participation of Government personnel in the voluntary standards process; reports by standards organizations, industry, and DOEmore » representatives on current technology exchange programs; and how the road ahead appears for `information superhighway` standardization. Another session highlights successful standardization case studies selected from several sites across the DOE complex. The workshop concludes with a panel discussion on the goals and objectives of the DOE Technical Standards Program as envisioned by senior DOE management. The annual workshop on technical standards has proven to be an effective medium for communicating information related to standards throughout the DOE community. Technical standards are used to transfer technology and standardize work processes to produce consistent, acceptable results. They provide a practical solution to the Department`s challenge to protect the environment and the health and safety of the public and workers during all facility operations. Through standards, the technologies of industries and governments worldwide are available to DOE. The DOE Technical Standards Program, a Department-wide effort that crosscuts all organizations and disciplines, links the Department to those technologies.« less

  16. Space Station propulsion electrolysis system - 'A technology challenge'

    NASA Technical Reports Server (NTRS)

    Le, Michael

    1989-01-01

    The Space Station propulsion system will utilize a water electrolysis system to produce the required eight-to-one ratio of gaseous hydrogen and oxygen propellants. This paper summarizes the state of the art in water electrolysis technologies and the supporting development programs at the NASA Lyndon B. Johnson Space Center. Preliminary proof of concept test data from a fully integrated propulsion testbed are discussed. The technical challenges facing the development of the high-pressure water electrolysis system are discussed.

  17. Centennial Challenges

    NASA Image and Video Library

    2010-02-26

    Doug Comstock, NASA's Director, Innovative Partnership Office, speaks during a ceremony for winners and participants of NASA’s 2009 Centennial Challenges, Friday, Feb. 26, 2010, at NASA Headquarters in Washington. The year-long competition addresses a range of technical challenges that support NASA's missions in aeronautics and space with a goal of encouraging novel solutions from non-traditional sources. Photo Credit: (NASA/Paul E. Alers)

  18. A Procedural Skills OSCE: Assessing Technical and Non-Technical Skills of Internal Medicine Residents

    ERIC Educational Resources Information Center

    Pugh, Debra; Hamstra, Stanley J.; Wood, Timothy J.; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges

    2015-01-01

    Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal…

  19. C2 Link Security for UAS: Technical Literature Study and Preliminary Functional Requirements. Version 0.9 (Working Draft)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This document provides a study of the technical literature related to Command and Control (C2) link security for Unmanned Aircraft Systems (UAS) for operation in the National Airspace System (NAS). Included is a preliminary set of functional requirements for C2 link security.

  20. Challenges for Social Control in Wireless Mobile Grids

    NASA Astrophysics Data System (ADS)

    Balke, Tina; Eymann, Torsten

    The evolution of mobile phones has lead to new wireless mobile grids that lack a central controlling instance and require the cooperation of autonomous entities that can voluntarily commit resources, forming a common pool which can be used in order to achieve common and/or individual goals. The social dilemma in such systems is that it is advantageous for rational users to access the common pool resources without any own commitment, since every commitment has its price (see ? for example). However, if a substantial number of users would follow this selfish strategy, the network itself would be at stake. Thus, the question arises on how cooperation can be fostered in wireless mobile grids. Whereas many papers have dealt with this question from a technical point of view, instead this paper will concentrate on a concept that has lately been discussed a lot with this regard: social control. Thereby social control concepts will be contrasted to technical approaches and resulting challenges (as well as possible solutions to these challenges) for social concepts will be discussed.

  1. Anomalous Coronary Artery From the Opposite Sinus (ACAOS): Technical Challenges During Percutaneous Coronary Intervention.

    PubMed

    Sinha, Santosh Kumar; Razi, Mahmodula; Mahrotra, Anupam; Aggarwal, Puneet; Singh, Anupam; Rekwal, Lokendra; Tripathi, Sunil; Abhishekh, Nishant Kumar; Krishna, Vinay

    2018-04-01

    Anomalies of the coronary arteries are reported in 1-2% of patients among diagnostic angiogram. Ectopic origin of right coronary artery (RCA) from opposite sinus is one of the most common and they are mainly benign, but at times may be malignant. We report a case of a 69-year-old male who underwent early invasive percutaneous coronary intervention for non-ST-segment elevation myocardial infarction (NSTEMI) where RCA arising from left sinus at the root of left main artery was culprit and various technical challenges were encountered while intervening in form of cannulation to tracking of hardwares. RCA was cannulated with floating wire technique using hockey stick guide catheter and revascularized by deployment of 3.5 × 38 mm Promus Premier Everolimus eluting stent (Boston Scientific, USA). To the best of our knowledge, this is the first ever report of ectopic RCA being revascularized by using hockey stick catheter.

  2. Non-technical skills of surgical trainees and experienced surgeons.

    PubMed

    Gostlow, H; Marlow, N; Thomas, M J W; Hewett, P J; Kiermeier, A; Babidge, W; Altree, M; Pena, G; Maddern, G

    2017-05-01

    In addition to technical expertise, surgical competence requires effective non-technical skills to ensure patient safety and maintenance of standards. Recently the Royal Australasian College of Surgeons implemented a new Surgical Education and Training (SET) curriculum that incorporated non-technical skills considered essential for a competent surgeon. This study sought to compare the non-technical skills of experienced surgeons who completed their training before the introduction of SET with the non-technical skills of more recent trainees. Surgical trainees and experienced surgeons undertook a simulated scenario designed to challenge their non-technical skills. Scenarios were video recorded and participants were assessed using the Non-Technical Skills for Surgeons (NOTSS) scoring system. Participants were divided into subgroups according to years of experience and their NOTSS scores were compared. For most NOTSS elements, mean scores increased initially, peaking around the time of Fellowship, before decreasing roughly linearly over time. There was a significant downward trend in score with increasing years since being awarded Fellowship for six of the 12 NOTSS elements: considering options (score -0·015 units per year), implementing and reviewing decisions (-0·020 per year), establishing a shared understanding (-0·014 per year), setting and maintaining standards (-0·024 per year), supporting others (-0·031 per year) and coping with pressure (-0·015 per year). The drop in NOTSS score was unexpected and highlights that even experienced surgeons are not immune to deficiencies in non-technical skills. Consideration should be given to continuing professional development programmes focusing on non-technical skills, regardless of the level of professional experience. © 2017 BJS Society Ltd Published by John Wiley & Sons Ltd.

  3. Fuel cells for transport: can the promise be fulfilled? Technical requirements and demands from customers

    NASA Astrophysics Data System (ADS)

    Klaiber, Thomas

    The paper discusses the technical requirements and the customer demands for vehicles that have an on-board methanol reformer and fuel cells. The research concentrates on the technical developmental risks which include minimizing volume, reducing weight and, at the same time, improving efficiency and system dynamics. Fuel cell powered vehicles with methanol reformers are not only suitable for a niche market but also these vehicles will compete with conventional vehicles. The greatest hindrance will be the price of the fuel cell. A possible progressive development of the number of fuel cell powered vehicles in conjunction with a reduction in costs will be discussed in the paper. When fuel cell vehicles come to the market it is necessary that an infrastructure for the fuel methanol or hydrogen is installed. Therefore, it will only be possible to introduce fuel cell vehicles into special markets, e.g. California. Such a process will need to be subsidized by additional incentives like tax concessions. Today there are many technical risks and unsolved problems relating to production technologies, infrastructure, and costs. Nevertheless, among the alternative power units, the fuel cell seems to be the only one that might be competitive to the conventional power unit, especially relating to emissions.

  4. Epigenome-wide association studies for cancer biomarker discovery in circulating cell-free DNA: technical advances and challenges.

    PubMed

    Tanić, Miljana; Beck, Stephan

    2017-02-01

    Since introducing the concept of epigenome-wide association studies (EWAS) in 2011, there has been a vast increase in the number of published EWAS studies in common diseases, including in cancer. These studies have increased our understanding of epigenetic events underlying carcinogenesis and have enabled the discovery of cancer-specific methylation biomarkers. In this mini-review, we have focused on the state of the art in EWAS applied to cell-free circulating DNA for epigenetic biomarker discovery in cancer and discussed associated technical advances and challenges, and our expectations for the future of the field. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  5. Education for a Working America. A Vision of Vocational Technical Education.

    ERIC Educational Resources Information Center

    National Association of State Directors of Vocational Technical Education Consortium.

    This document presents the views of the National Association of State Directors of Vocational Technical Education regarding the challenge, mission, vision, underlying principles, practice, needs, and benefits/potential outcomes of vocational-technical education (VTE). The following topics are discussed: the challenge of making VTE the cornerstone…

  6. [Internet research methods: advantages and challenges].

    PubMed

    Liu, Yi; Tien, Yueh-Hsuan

    2009-12-01

    Compared to traditional research methods, using the Internet to conduct research offers a number of advantages to the researcher, which include increased access to sensitive issues and vulnerable / hidden populations; decreased data entry time requirements; and enhanced data accuracy. However, Internet research also presents certain challenges to the researcher. In this article, the advantages and challenges of Internet research methods are discussed in four principle issue areas: (a) recruitment, (b) data quality, (c) practicality, and (d) ethics. Nursing researchers can overcome problems related to sampling bias and data truthfulness using creative methods; resolve technical problems through collaboration with other disciplines; and protect participant's privacy, confidentiality and data security by maintaining a high level of vigilance. Once such issues have been satisfactorily addressed, the Internet should open a new window for Taiwan nursing research.

  7. Establishing ecological and social continuities: new challenges to optimize urban watershed management

    NASA Astrophysics Data System (ADS)

    Mitroi, V.; de Coninck, A.; Vinçon-Leite, B.; Deroubaix, J.-F.

    2014-09-01

    The (re)construction of the ecological continuity is stated as one of the main objectives of the European Water Framework Directive for watershed management in Europe. Analysing the social, political, technical and scientific processes characterising the implementation of different projects of ecological continuity in two adjacent peri-urban territories in Ile-de-France, we observed science-driven approaches disregarding the social contexts. We show that, in urbanized areas, ecological continuity requires not only important technical and ecological expertise, but also social and political participation to the definition of a common vision and action plan. Being a challenge for both, technical water management institutions and "classical" ecological policies, we propose some social science contributions to deal with ecological unpredictability and reconsider stakeholder resistance to this kind of project.

  8. The computational challenges of Earth-system science.

    PubMed

    O'Neill, Alan; Steenman-Clark, Lois

    2002-06-15

    The Earth system--comprising atmosphere, ocean, land, cryosphere and biosphere--is an immensely complex system, involving processes and interactions on a wide range of space- and time-scales. To understand and predict the evolution of the Earth system is one of the greatest challenges of modern science, with success likely to bring enormous societal benefits. High-performance computing, along with the wealth of new observational data, is revolutionizing our ability to simulate the Earth system with computer models that link the different components of the system together. There are, however, considerable scientific and technical challenges to be overcome. This paper will consider four of them: complexity, spatial resolution, inherent uncertainty and time-scales. Meeting these challenges requires a significant increase in the power of high-performance computers. The benefits of being able to make reliable predictions about the evolution of the Earth system should, on their own, amply repay this investment.

  9. Engineering the System and Technical Integration

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.

    2011-01-01

    Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.

  10. Dosimetry for audit and clinical trials: challenges and requirements

    NASA Astrophysics Data System (ADS)

    Kron, T.; Haworth, A.; Williams, I.

    2013-06-01

    Many important dosimetry audit networks for radiotherapy have their roots in clinical trial quality assurance (QA). In both scenarios it is essential to test two issues: does the treatment plan conform with the clinical requirements and is the plan a reasonable representation of what is actually delivered to a patient throughout their course of treatment. Part of a sound quality program would be an external audit of these issues with verification of the equivalence of plan and treatment typically referred to as a dosimetry audit. The increasing complexity of radiotherapy planning and delivery makes audits challenging. While verification of absolute dose delivered at a reference point was the standard of external dosimetry audits two decades ago this is often deemed inadequate for verification of treatment approaches such as Intensity Modulated Radiation Therapy (IMRT) and Volumetric Modulated Arc Therapy (VMAT). As such, most dosimetry audit networks have successfully introduced more complex tests of dose delivery using anthropomorphic phantoms that can be imaged, planned and treated as a patient would. The new challenge is to adapt this approach to ever more diversified radiotherapy procedures with image guided/adaptive radiotherapy, motion management and brachytherapy being the focus of current research.

  11. Technical Assistance | NREL

    Science.gov Websites

    Multi-Wind Heat Smart Grid Project. Advancing Energy Solutions in Alaska NREL provides analysis mission to transfer knowledge and innovation to solve the nation's energy challenges. The goal of this transportation energy efficiency and reduce transportation energy costs State Technical Assistance-solar market

  12. Centennial Challenges

    NASA Image and Video Library

    2010-02-26

    NASA Administrator Charles Bolden, right, and Doug Comstock, left, stand with David Masten, of Masten Space Systems, during a ceremony for winners and participants of NASA’s 2009 Centennial Challenges, Friday, Feb. 26, 2010, at NASA Headquarters in Washington. The year-long competition addresses a range of technical challenges that support NASA's missions in aeronautics and space with a goal of encouraging novel solutions from non-traditional sources. Photo Credit: (NASA/Paul E. Alers)

  13. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  14. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  15. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  16. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...

  17. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...

  18. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...

  19. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...

  20. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...

  1. Assessing Students' Technical Skill Attainment

    ERIC Educational Resources Information Center

    Jorgensen, Haley

    2010-01-01

    The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…

  2. New Mass Properties Engineers Aerospace Ballasting Challenge Facilitated by the SAWE Community

    NASA Technical Reports Server (NTRS)

    Cutright, Amanda; Shaughnessy, Brendan

    2010-01-01

    The discipline of Mass Properties Engineering tends to find the engineers; not typically vice versa. In this case, two engineers quickly found their new responsibilities deep in many aspects of mass properties engineering and required to meet technical challenges in a fast paced environment. As part of NASA's Constellation Program, a series of flight tests will be conducted to evaluate components of the new spacecraft launch vehicles. One of these tests is the Pad Abort 1 (PA-1) flight test which will test the Launch Abort System (LAS), a system designed to provide escape for astronauts in the event of an emergency. The Flight Test Articles (FTA) used in this flight test are required to match mass properties corresponding to the operational vehicle, which has a continually evolving design. Additionally, since the structure and subsystems for the Orion Crew Module (CM) FTA are simplified versions of the final product, thousands of pounds of ballast are necessary to achieve the desired mass properties. These new mass properties engineers are responsible for many mass properties aspects in support of the flight test, including meeting the ballasting challenge for the CM Boilerplate FTA. SAWE expert and experienced mass properties engineers, both those that are directly on the team and many that supported via a variety of Society venues, significantly contributed to facilitating the success of addressing this particular mass properties ballasting challenge, in addition to many other challenges along the way. This paper discusses the details regarding the technical aspects of this particular mass properties challenge, as well as identifies recommendations for new mass properties engineers that were learned from the SAWE community along the way.

  3. The French Space Operation Act: Technical Regulations

    NASA Astrophysics Data System (ADS)

    Trinchero, J. P.; Lazare, B.

    2010-09-01

    The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.

  4. International Low Impact Docking System (iLIDS) Project Technical Requirements Specification, Revision F

    NASA Technical Reports Server (NTRS)

    Lewis, James L.

    2011-01-01

    The NASA Docking System (NDS) is NASA's implementation for the emerging International Docking System Standard (IDSS) using low impact docking technology. The NASA Docking System Project (NDSP) is the International Space Station (ISS) Program's project to produce the NDS, Common Docking Adapter (CDA) and Docking Hub. The NDS design evolved from the Low Impact Docking System (LIDS). The acronym international Low Impact Docking System (iLIDS) is also used to describe this system as well as the Government Furnished Equipment (GFE) project designing the NDS for the NDSP. NDS and iLIDS may be used interchangeability. This document will use the acronym iLIDS. Some of the heritage documentation and implementations (e.g., software command names, requirement identification (ID), figures, etc.) used on NDS will continue to use the LIDS acronym. This specification defines the technical requirements for the iLIDS GFE delivered to the NDSP by the iLIDS project. This document contains requirements for two iLIDS configurations, SEZ29101800-301 and SEZ29101800-302. Requirements with the statement, iLIDS shall, are for all configurations. Examples of requirements that are unique to a single configuration may be identified as iLIDS (-301) shall or iLIDS (-302) shall. Furthermore, to allow a requirement to encompass all configurations with an exception, the requirement may be designated as iLIDS (excluding -302) shall. Verification requirements for the iLIDS project are identified in the Verification Matrix (VM) provided in the iLIDS Verification and Validation Document, JSC-63966. The following definitions differentiate between requirements and other statements: Shall: This is the only verb used for the binding requirements. Should/May: These verbs are used for stating non-mandatory goals. Will: This verb is used for stating facts or declaration of purpose. A Definition of Terms table is provided in Appendix B to define those terms with specific tailored uses in this document.

  5. 46 CFR 12.611 - Requirements to qualify for an STCW endorsement as electro-technical rating (ETR) on vessels...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Requirements to qualify for an STCW endorsement as electro-technical rating (ETR) on vessels powered by main propulsion machinery of 750 kW/1,000 HP or more... propulsion machinery of 750 kW/1,000 HP or more. (a) To qualify for an STCW endorsement as an electro...

  6. Analysis of Aviation Safety Reporting System Incident Data Associated With the Technical Challenges of the Vehicle Systems Safety Technology Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This analysis was conducted to support the Vehicle Systems Safety Technology (VSST) Project of the Aviation Safety Program (AVsP) milestone VSST4.2.1.01, "Identification of VSST-Related Trends." In particular, this is a review of incident data from the NASA Aviation Safety Reporting System (ASRS). The following three VSST-related technical challenges (TCs) were the focus of the incidents searched in the ASRS database: (1) Vechicle health assurance, (2) Effective crew-system interactions and decisions in all conditions; and (3) Aircraft loss of control prevention, mitigation, and recovery.

  7. The Colombian nuclear scenario: Challenges and opportunities

    NASA Astrophysics Data System (ADS)

    Martinez, Isabel

    2016-07-01

    In Colombia, the absence of nuclear-oriented policies based on technical knowledge, the closing of the Nuclear Affairs Institute (1956-1998), the association of the word "nuclear" with weapons, plus the country's last six decades of internal conflict and narcotraffic have discourage the technical, social and environmental nuclear advance. However, there are technical, social and economic national challenges that could be faced by the present nuclear technical capacities.

  8. Additive Manufacturing of Silicon Carbide-Based Ceramic Matrix Composites: Technical Challenges and Opportunities

    NASA Technical Reports Server (NTRS)

    Singh, Mrityunjay; Halbig, Michael C.; Grady, Joseph E.

    2016-01-01

    Advanced SiC-based ceramic matrix composites offer significant contributions toward reducing fuel burn and emissions by enabling high overall pressure ratio (OPR) of gas turbine engines and reducing or eliminating cooling air in the hot-section components, such as shrouds, combustor liners, vanes, and blades. Additive manufacturing (AM), which allows high value, custom designed parts layer by layer, has been demonstrated for metals and polymer matrix composites. However, there has been limited activity on additive manufacturing of ceramic matrix composites (CMCs). In this presentation, laminated object manufacturing (LOM), binder jet process, and 3-D printing approaches for developing ceramic composite materials are presented. For the laminated object manufacturing (LOM), fiber prepreg laminates were cut into shape with a laser and stacked to form the desired part followed by high temperature heat treatments. For the binder jet, processing optimization was pursued through silicon carbide powder blending, infiltration with and without SiC nano powder loading, and integration of fibers into the powder bed. Scanning electron microscopy was conducted along with XRD, TGA, and mechanical testing. Various technical challenges and opportunities for additive manufacturing of ceramics and CMCs will be presented.

  9. Technical Assistance Needs Assessments (TANAs)

    EPA Pesticide Factsheets

    The Technical Assistance Needs Assessment (TANA) is a process to identify whether a community requires additional support from EPA in order to understand technical information and have meaningful participation in the Superfund decision-making process.

  10. Accomplishments and challenges of surgical simulation.

    PubMed

    Satava, R M

    2001-03-01

    For nearly a decade, advanced computer technologies have created extraordinary educational tools using three-dimensional (3D) visualization and virtual reality. Pioneering efforts in surgical simulation with these tools have resulted in a first generation of simulators for surgical technical skills. Accomplishments include simulations with 3D models of anatomy for practice of surgical tasks, initial assessment of student performance in technical skills, and awareness by professional societies of potential in surgical education and certification. However, enormous challenges remain, which include improvement of technical fidelity, standardization of accurate metrics for performance evaluation, integration of simulators into a robust educational curriculum, stringent evaluation of simulators for effectiveness and value added to surgical training, determination of simulation application to certification of surgical technical skills, and a business model to implement and disseminate simulation successfully throughout the medical education community. This review looks at the historical progress of surgical simulators, their accomplishments, and the challenges that remain.

  11. 24 CFR 891.175 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 891.175... Requirements § 891.175 Technical assistance. For purposes of the Section 202 Program and the Section 811 Program, the Secretary shall make available appropriate technical assistance to assure that applicants...

  12. The technical consideration of multi-beam mask writer for production

    NASA Astrophysics Data System (ADS)

    Lee, Sang Hee; Ahn, Byung-Sup; Choi, Jin; Shin, In Kyun; Tamamushi, Shuichi; Jeon, Chan-Uk

    2016-10-01

    Multi-beam mask writer is under development to solve the throughput and patterning resolution problems in VSB mask writer. Theoretically, the writing time is appropriate for future design node and the resolution is improved with multi-beam mask writer. Many previous studies show the feasible results of resolution, CD control and registration. Although such technical results of development tool seem to be enough for mass production, there are still many unexpected problems for real mass production. In this report, the technical challenges of multi-beam mask writer are discussed in terms of production and application. The problems and issues are defined based on the performance of current development tool compared with the requirements of mask quality. Using the simulation and experiment, we analyze the specific characteristics of electron beam in multi-beam mask writer scheme. Consequently, we suggest necessary specifications for mass production with multi-beam mask writer in the future.

  13. Conductors for commercial MRI magnets beyond NbTi: requirements and challenges.

    PubMed

    Parizh, Michael; Lvovsky, Yuri; Sumption, Michael

    2017-01-01

    Magnetic Resonance Imaging (MRI), a powerful medical diagnostic tool, is the largest commercial application of superconductivity. The superconducting magnet is the largest and most expensive component of an MRI system. The magnet configuration is determined by competing requirements including optimized functional performance, patient comfort, ease of siting in a hospital environment, minimum acquisition and lifecycle cost including service. In this paper, we analyze conductor requirements for commercial MRI magnets beyond traditional NbTi conductors, while avoiding links to a particular magnet configuration or design decisions. Potential conductor candidates include MgB 2 , ReBCO and BSCCO options. The analysis shows that no MRI-ready non-NbTi conductor is commercially available at the moment. For some conductors, MRI specifications will be difficult to achieve in principle. For others, cost is a key barrier. In some cases, the prospects for developing an MRI-ready conductor are more favorable, but significant developments are still needed. The key needs include the development of, or significant improvements in: (a) conductors specifically designed for MRI applications, with form-fit-and-function readily integratable into the present MRI magnet technology with minimum modifications. Preferably, similar conductors should be available from multiple vendors; (b) conductors with improved quench characteristics, i.e. the ability to carry significant current without damage while in the resistive state; (c) insulation which is compatible with manufacturing and refrigeration technologies; (d) dramatic increases in production and long-length quality control, including large-volume conductor manufacturing technology. In-situ MgB 2 is, perhaps, the closest to meeting commercial and technical requirements to become suitable for commercial MRI. Conductor technology is an important, but not the only, issue in introduction of HTS / MgB 2 conductor into commercial MRI magnets

  14. Conductors for commercial MRI magnets beyond NbTi: requirements and challenges

    NASA Astrophysics Data System (ADS)

    Parizh, Michael; Lvovsky, Yuri; Sumption, Michael

    2017-01-01

    Magnetic resonance imaging (MRI), a powerful medical diagnostic tool, is the largest commercial application of superconductivity. The superconducting magnet is the largest and most expensive component of an MRI system. The magnet configuration is determined by competing requirements including optimized functional performance, patient comfort, ease of siting in a hospital environment, minimum acquisition and lifecycle cost including service. In this paper, we analyze conductor requirements for commercial MRI magnets beyond traditional NbTi conductors, while avoiding links to a particular magnet configuration or design decisions. Potential conductor candidates include MgB2, ReBCO and BSCCO options. The analysis shows that no MRI-ready non-NbTi conductor is commercially available at the moment. For some conductors, MRI specifications will be difficult to achieve in principle. For others, cost is a key barrier. In some cases, the prospects for developing an MRI-ready conductor are more favorable, but significant developments are still needed. The key needs include the development of, or significant improvements in: (a) conductors specifically designed for MRI applications, with form-fit-and-function readily integratable into the present MRI magnet technology with minimum modifications. Preferably, similar conductors should be available from multiple vendors; (b) conductors with improved quench characteristics, i.e. the ability to carry significant current without damage while in the resistive state; (c) insulation which is compatible with manufacturing and refrigeration technologies; (d) dramatic increases in production and long-length quality control, including large-volume conductor manufacturing technology. In-situ MgB2 is, perhaps, the closest to meeting commercial and technical requirements to become suitable for commercial MRI. Conductor technology is an important, but not the only, issue in introduction of HTS/MgB2 conductor into commercial MRI magnets. These

  15. Conductors for commercial MRI magnets beyond NbTi: requirements and challenges

    PubMed Central

    Parizh, Michael; Lvovsky, Yuri; Sumption, Michael

    2016-01-01

    Magnetic Resonance Imaging (MRI), a powerful medical diagnostic tool, is the largest commercial application of superconductivity. The superconducting magnet is the largest and most expensive component of an MRI system. The magnet configuration is determined by competing requirements including optimized functional performance, patient comfort, ease of siting in a hospital environment, minimum acquisition and lifecycle cost including service. In this paper, we analyze conductor requirements for commercial MRI magnets beyond traditional NbTi conductors, while avoiding links to a particular magnet configuration or design decisions. Potential conductor candidates include MgB2, ReBCO and BSCCO options. The analysis shows that no MRI-ready non-NbTi conductor is commercially available at the moment. For some conductors, MRI specifications will be difficult to achieve in principle. For others, cost is a key barrier. In some cases, the prospects for developing an MRI-ready conductor are more favorable, but significant developments are still needed. The key needs include the development of, or significant improvements in: (a) conductors specifically designed for MRI applications, with form-fit-and-function readily integratable into the present MRI magnet technology with minimum modifications. Preferably, similar conductors should be available from multiple vendors; (b) conductors with improved quench characteristics, i.e. the ability to carry significant current without damage while in the resistive state; (c) insulation which is compatible with manufacturing and refrigeration technologies; (d) dramatic increases in production and long-length quality control, including large-volume conductor manufacturing technology. In-situ MgB2 is, perhaps, the closest to meeting commercial and technical requirements to become suitable for commercial MRI. Conductor technology is an important, but not the only, issue in introduction of HTS / MgB2 conductor into commercial MRI magnets. These

  16. Technical evaluation of RETS-required reports for Browns Ferry Nuclear Power Station, Units 1, 2, and 3, for 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, T.E.; Magleby, E.H.

    1985-09-06

    A review was performed of reports required by federal regulations and the plant-specific radiological effluent technical specifications (RETS) for operations conducted at Tennessee Valley Authority's Browns Ferry Nuclear Station, Units 1, 2, and 3, during 1983. The two periodic reports reviewed were (a) the Effluents and Waste Disposal Semiannual Report, First Half 1983 and (b) the Effluents and Waste Disposal Semiannual Report, Second Half 1983. The principal review guidelines were the plant's specific RETs and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably completemore » and consistent with the review guidelines.« less

  17. Challenges and status of ITER conductor production

    NASA Astrophysics Data System (ADS)

    Devred, A.; Backbier, I.; Bessette, D.; Bevillard, G.; Gardner, M.; Jong, C.; Lillaz, F.; Mitchell, N.; Romano, G.; Vostner, A.

    2014-04-01

    Taking the relay of the large Hadron collider (LHC) at CERN, ITER has become the largest project in applied superconductivity. In addition to its technical complexity, ITER is also a management challenge as it relies on an unprecedented collaboration of seven partners, representing more than half of the world population, who provide 90% of the components as in-kind contributions. The ITER magnet system is one of the most sophisticated superconducting magnet systems ever designed, with an enormous stored energy of 51 GJ. It involves six of the ITER partners. The coils are wound from cable-in-conduit conductors (CICCs) made up of superconducting and copper strands assembled into a multistage cable, inserted into a conduit of butt-welded austenitic steel tubes. The conductors for the toroidal field (TF) and central solenoid (CS) coils require about 600 t of Nb3Sn strands while the poloidal field (PF) and correction coil (CC) and busbar conductors need around 275 t of Nb-Ti strands. The required amount of Nb3Sn strands far exceeds pre-existing industrial capacity and has called for a significant worldwide production scale up. The TF conductors are the first ITER components to be mass produced and are more than 50% complete. During its life time, the CS coil will have to sustain several tens of thousands of electromagnetic (EM) cycles to high current and field conditions, way beyond anything a large Nb3Sn coil has ever experienced. Following a comprehensive R&D program, a technical solution has been found for the CS conductor, which ensures stable performance versus EM and thermal cycling. Productions of PF, CC and busbar conductors are also underway. After an introduction to the ITER project and magnet system, we describe the ITER conductor procurements and the quality assurance/quality control programs that have been implemented to ensure production uniformity across numerous suppliers. Then, we provide examples of technical challenges that have been encountered and

  18. Urology technical and non-technical skills development: the emerging role of simulation.

    PubMed

    Rashid, Prem; Gianduzzo, Troy R J

    2016-04-01

    To review the emerging role of technical and non-technical simulation in urological education and training. A review was conducted to examine the current role of simulation in urology training. A PUBMED search of the terms 'urology training', 'urology simulation' and 'urology education' revealed 11,504 titles. Three hundred and fifty-seven abstracts were identified as English language, peer reviewed papers pertaining to the role of simulation in urology and related topics. Key papers were used to explore themes. Some cross-referenced papers were also included. There is an ongoing need to ensure that training time is efficiently utilised while ensuring that optimal technical and non-technical skills are achieved. Changing working conditions and the need to minimise patient harm by inadvertent errors must be taken into account. Simulation models for specific technical aspects have been the mainstay of graduated step-wise low and high fidelity training. Whole scenario environments as well as non-technical aspects can be slowly incorporated into the curriculum. Doing so should also help define what have been challenging competencies to teach and evaluate. Dedicated time, resources and trainer up-skilling are important. Concurrent studies are needed to help evaluate the effectiveness of introducing step-wise simulation for technical and non-technical competencies. Simulation based learning remains the best avenue of progressing surgical education. Technical and non-technical simulation could be used in the selection process. There are good economic, logistic and safety reasons to pursue the process of ongoing development of simulation co-curricula. While the role of simulation is assured, its progress will depend on a structured program that takes advantage of what can be delivered via this medium. Overall, simulation can be developed further for urological training programs to encompass technical and non-technical skill development at all stages, including

  19. The Maternal-to-Zygotic Transition in Higher Plants: Available Approaches, Critical Limitations, and Technical Requirements.

    PubMed

    Zhao, Peng; Sun, Meng-Xiang

    2015-01-01

    Fertilization marks the turnover from the gametophyte to sporophyte generation in higher plants. After fertilization, sporophytic development undergoes genetic turnover from maternal to zygotic control: the maternal-to-zygotic transition (MZT). The MZT is thought to be critical for early embryogenesis; however, little is known about the time course or developmental impact of the MZT in higher plants. Here, we discuss what is known in the field and focus on techniques used in relevant studies and their limitations. Some significant questions and technical requirements for further investigations are also discussed. © 2015 Elsevier Inc. All rights reserved.

  20. Managing Challenges in a Multi Contractor Project

    NASA Technical Reports Server (NTRS)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  1. Employment of telemedicine in emergency medicine. Clinical requirement analysis, system development and first test results.

    PubMed

    Czaplik, M; Bergrath, S; Rossaint, R; Thelen, S; Brodziak, T; Valentin, B; Hirsch, F; Beckers, S K; Brokmann, J C

    2014-01-01

    Demographic change, rising co-morbidity and an increasing number of emergencies are the main challenges that emergency medical services (EMS) in several countries worldwide are facing. In order to improve quality in EMS, highly trained personnel and well-equipped ambulances are essential. However several studies have shown a deficiency in qualified EMS physicians. Telemedicine emerges as a complementary system in EMS that may provide expertise and improve quality of medical treatment on the scene. Hence our aim is to develop and test a specific teleconsultation system. During the development process several use cases were defined and technically specified by medical experts and engineers in the areas of: system administration, start-up of EMS assistance systems, audio communication, data transfer, routine tele-EMS physician activities and research capabilities. Upon completion, technical field tests were performed under realistic conditions to test system properties such as robustness, feasibility and usability, providing end-to-end measurements. Six ambulances were equipped with telemedical facilities based on the results of the requirement analysis and 55 scenarios were tested under realistic conditions in one month. The results indicate that the developed system performed well in terms of usability and robustness. The major challenges were, as expected, mobile communication and data network availability. Third generation networks were only available in 76.4% of the cases. Although 3G (third generation), such as Universal Mobile Telecommunications System (UMTS), provides beneficial conditions for higher bandwidth, system performance for most features was also acceptable under adequate 2G (second generation) test conditions. An innovative concept for the use of telemedicine for medical consultations in EMS was developed. Organisational and technical aspects were considered and practical requirements specified. Since technical feasibility was demonstrated in these

  2. [Three applications and the challenge of the big data in otology].

    PubMed

    Lei, Guanxiong; Li, Jianan; Shen, Weidong; Yang, Shiming

    2016-03-01

    With the expansion of human practical activities, more and more areas have suffered from big data problems. The emergence of big data requires people to update the research paradigm and develop new technical methods. This review discussed that big data might bring opportunities and challenges in the area of auditory implantation, the deafness genome, and auditory pathophysiology, and pointed out that we needed to find appropriate theories and methods to make this kind of expectation into reality.

  3. A Report to the U.S. Department of Education on Educational Challenges and Technical Assistance Needs for the Appalachia Region

    ERIC Educational Resources Information Center

    CNA Corporation, 2005

    2005-01-01

    The Secretary of the U.S. Department of Education (ED) appointed eleven members to the Appalachian Regional Advisory Committee (AP RAC) to provide advice concerning the educational needs of the region as required by the Educational Technical Assistance Act of 2002 (Public Law 107-279; 20 USC 9605). The RAC was charged with providing this advice…

  4. Airport Noise Tech Challenge Overview

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2011-01-01

    The Supersonics Project, operating under NASA Aeronautics Mission Directorate#s Fundamental Aero Program, has been organized around the Technical Challenges that have historically precluded commercial supersonic flight. One of these Challenges is making aircraft that are capable of such high aerodynamic performance quiet enough around airports that they will not be objectionable. It is recognized that a successful civilian supersonic aircraft will be a system where many new technologies will come together, and for this to happen not only will new low noise propulsion concepts be required, but new engineering tools that predict the noise of the aircraft as these technologies are combined and compromised with the rest of the aircraft design. These are the two main objectives of the Airport Noise Tech Challenge. " ! As a Project in the Fundamental Aero Program, we work at a relatively low level of technology readiness. However, we have high level milestones which force us to integrate our efforts to impact systems-level activities. To keep the low-level work tied to delivering engineering tools and low-noise concepts, we have structured our milestones around development of the concepts and organized our activities around developing and applying our engineering tools to these concepts. The final deliverables in these milestones are noise prediction modules validated against the best embodiment of each concept. These will then be used in cross-disciplinary exercises to demonstrate the viability of aircraft designs to meet all the Technical Challenges. Some of the concepts being developed are shown: Fan Flow Diverters, Multi-jet Shielding, High-Aspect Ratio Embedded Nozzles, Plasma Actuated Instability Manipulation, Highly Variable Cycle Mixer- Ejectors, and Inverted Velocity Profiles. These concepts are being developed for reduced jet noise along with the design tools which describe how they perform when used in various aircraft configurations. Several key upcoming

  5. Fossil Energy: Drivers and Challenges.

    NASA Astrophysics Data System (ADS)

    Friedmann, Julio

    2007-04-01

    Concerns about rapid economic growth, energy security, and global climate change have created a new landscape for fossil energy exploration, production, and utilization. Since 85% of primary energy supply comes from fossil fuels, and 85% of greenhouse gas emissions come from fossil fuel consumption, new and difficult technical and political challenges confront commercial, governmental, and public stakeholders. As such, concerns over climate change are explicitly weighed against security of international and domestic energy supplies, with economic premiums paid for either or both. Efficiency improvements, fuel conservation, and deployment of nuclear and renewable supplies will help both concerns, but are unlikely to offset growth in the coming decades. As such, new technologies and undertakings must both provide high quality fossil energy with minimal environmental impacts. The largest and most difficult of these undertakings is carbon management, wherein CO2 emissions are sequestered indefinitely at substantial incremental cost. Geological formations provide both high confidence and high capacity for CO2 storage, but present scientific and technical challenges. Oil and gas supply can be partially sustained and replaced through exploitation of unconventional fossil fuels such as tar-sands, methane hydrates, coal-to-liquids, and oil shales. These fuels provide enormous reserves that can be exploited at current costs, but generally require substantial energy to process. In most cases, the energy return on investment (EROI) is dropping, and unconventional fuels are generally more carbon intensive than conventional, presenting additional carbon management challenges. Ultimately, a large and sustained science and technology program akin to the Apollo project will be needed to address these concerns. Unfortunately, real funding in energy research has dropped dramatically (75%) in the past three decades, and novel designs in fission and fusion are not likely to provide any

  6. A procedural skills OSCE: assessing technical and non-technical skills of internal medicine residents.

    PubMed

    Pugh, Debra; Hamstra, Stanley J; Wood, Timothy J; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges

    2015-03-01

    Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal medicine (IM) residents to assess their technical and non-technical skills when performing procedures. Thirty-five first to third-year IM residents participated in a 5-station PS-OSCE, which combined partial task models, standardized patients, and allied health professionals. Formal blueprinting was performed and content experts were used to develop the cases and rating instruments. Examiners underwent a frame-of-reference training session to prepare them for their rater role. Scores were compared by levels of training, experience, and to evaluation data from a non-procedural OSCE (IM-OSCE). Reliability was calculated using Generalizability analyses. Reliabilities for the technical and non-technical scores were 0.68 and 0.76, respectively. Third-year residents scored significantly higher than first-year residents on the technical (73.5 vs. 62.2%) and non-technical (83.2 vs. 75.1%) components of the PS-OSCE (p < 0.05). Residents who had performed the procedures more frequently scored higher on three of the five stations (p < 0.05). There was a moderate disattenuated correlation (r = 0.77) between the IM-OSCE and the technical component of the PS-OSCE scores. The PS-OSCE is a feasible method for assessing multiple competencies related to performing procedures and this study provides validity evidence to support its use as an in-training examination.

  7. TECHNICAL MANPOWER IN NEW YORK STATE. VOLUME II.

    ERIC Educational Resources Information Center

    AMATULLI, ANGELO; AND OTHERS

    THE JOB CONTENT OF THE TECHNICAL OCCUPATIONS AND THE TECHNICAL SKILLS AND SUBJECT MATTER KNOWLEDGES REQUIRED ARE BASED PRIMARILY ON INFORMATION SUPPLIED BY EMPLOYERS FROM 17,414 ESTABLISHMENTS IN NEW YORK STATE. DATA ARE ALSO GIVEN ON GRADE STRUCTURE, EDUCATION AND EXPERIENCE REQUIREMENTS, TESTS AND LICENSES REQUIRED FOR THE JOB, SOURCES OF…

  8. Technical Skill Attainment and Post-Program Outcomes: An Analysis of Pennsylvania Secondary Career and Technical Education Graduates

    ERIC Educational Resources Information Center

    Staklis, Sandra; Klein, Steven

    2010-01-01

    Since the mid-1990s, the Pennsylvania Department of Education (PDE) has required all students concentrating in career and technical education (CTE) programs to complete a standardized technical skill assessment at or near the end of their program. Results of technical skill assessments are used for a number of purposes, including recognizing…

  9. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  10. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  11. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  12. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  13. Technical challenges related to implementation of a formula one real time data acquisition and analysis system in a paediatric intensive care unit.

    PubMed

    Matam, B Rajeswari; Duncan, Heather

    2018-06-01

    Most existing, expert monitoring systems do not provide the real time continuous analysis of the monitored physiological data that is necessary to detect transient or combined vital sign indicators nor do they provide long term storage of the data for retrospective analyses. In this paper we examine the feasibility of implementing a long term data storage system which has the ability to incorporate real-time data analytics, the system design, report the main technical issues encountered, the solutions implemented and the statistics of the data recorded. McLaren Electronic Systems expertise used to continually monitor and analyse the data from F1 racing cars in real time was utilised to implement a similar real-time data recording platform system adapted with real time analytics to suit the requirements of the intensive care environment. We encountered many technical (hardware and software) implementation challenges. However there were many advantages of the system once it was operational. They include: (1) The ability to store the data for long periods of time enabling access to historical physiological data. (2) The ability to alter the time axis to contract or expand periods of interest. (3) The ability to store and review ECG morphology retrospectively. (4) Detailed post event (cardiac/respiratory arrest or other clinically significant deteriorations in patients) data can be reviewed clinically as opposed to trend data providing valuable clinical insight. Informed mortality and morbidity reviews can be conducted. (5) Storage of waveform data capture to use for algorithm development for adaptive early warning systems. Recording data from bed-side monitors in intensive care/wards is feasible. It is possible to set up real time data recording and long term storage systems. These systems in future can be improved with additional patient specific metrics which predict the status of a patient thus paving the way for real time predictive monitoring.

  14. Finance Program, Technical Assistance Brief 1

    DOT National Transportation Integrated Search

    1993-01-01

    This four page pamphlet highlights the work of the Federal Transit : Administration's Office of Technical Assistance and Safety. Articles in this : issue are: Transit's Finance Challenge, which discusses the three main aspects : of the Office's Finan...

  15. 2017 Exploration Rover Challenge event.

    NASA Image and Video Library

    2017-03-03

    2017 Exploration Rover Challenge events at the U.S. Space and Rocket Center in Huntsville, Alabama. High school and college students from around the U.S. and the world come together for this 2 day event which challenges them to compete for the fastest time as well as technical design of the actual rover itself.

  16. Site Guidelines for a "Making Middle Grades Work" Technical Review Visit

    ERIC Educational Resources Information Center

    Southern Regional Education Board, 2004

    2004-01-01

    The purpose of the Technical Review Visit (TRV) is to follow up on the actions taken to implement the recommendations indicated for each challenge in the most recent Technical Assistance Visit (TAV) report. This document provides the following: (1) Site Guidelines for the Making Middle Grades Work (MMGW) Technical Review Visit; (2) Site Checklist;…

  17. A research review on clinical needs, technical requirements, and normativity in the design of surgical robots.

    PubMed

    Díaz, Carlos Eduardo; Fernández, Roemi; Armada, Manuel; García, Felipe

    2017-12-01

    Nowadays robots play an important role in society, mainly due to the significant benefits they provide when utilized for assisting human beings in the execution of dangerous or repetitive tasks. Medicine is one of the fields in which robots are gaining greater use and development, especially those employed in minimally invasive surgery (MIS). However, due to the particular conditions of the human body where robots have to act, the design of these systems is complex, not only from a technical point of view, but also because the clinical needs and the normativity aspects are important considerations that have to be taken into account in order to achieve better performances and more secure systems for patients and surgeons. Thus, this paper explores the clinical needs and the technical requirements that will trace the roadmap for the next scientific and technological advances in the field of robotic surgery, the metrics that should be defined for safe technology development and the standards that are being elaborated for boosting the industry and facilitating systems integration. Copyright © 2017 John Wiley & Sons, Ltd.

  18. Getting Personal: Individuality, Innovation, and Technical Communication.

    ERIC Educational Resources Information Center

    Steiner, Carol J.

    1999-01-01

    Suggests that effective communication between technical and nontechnical people is difficult because technical communication lacks a personal dimension: technical people give up their identity to be considered competent. Argues that a different approach to communication education for scientists, engineers, and technologists is required to equip…

  19. The Interactive Electronic Technical Manual: Requirements, Current Status, and Implementation. Strategy Considerations.

    DTIC Science & Technology

    1991-07-01

    authoring systems. Concurrently, great strides in computer-aided design and computer-aided maintenance have contributed to this capability. 12 Junod ...J.; William A. Nugent; and L. John Junod . Plan for the Navy/Air Force Test of the Interactive Electronic Technical Manual (IETM) at Cecil Field...AFHRL Logistics and Human Factors Division, WPAFB. Aug 1990. 12. Junod , John L. PY90 Interactive Electronic Technical Manual (IETM) Portable Delivery

  20. Challenges in Modern Anti-Doping Analytical Science.

    PubMed

    Ayotte, Christiane; Miller, John; Thevis, Mario

    2017-01-01

    The challenges facing modern anti-doping analytical science are increasingly complex given the expansion of target drug substances, as the pharmaceutical industry introduces more novel therapeutic compounds and the internet offers designer drugs to improve performance. The technical challenges are manifold, including, for example, the need for advanced instrumentation for greater speed of analyses and increased sensitivity, specific techniques capable of distinguishing between endogenous and exogenous metabolites, or biological assays for the detection of peptide hormones or their markers, all of which require an important investment from the laboratories and recruitment of highly specialized scientific personnel. The consequences of introducing sophisticated and complex analytical procedures may result in the future in a change in the strategy applied by the Word Anti-Doping Agency in relation to the introduction and performance of new techniques by the network of accredited anti-doping laboratories. © 2017 S. Karger AG, Basel.

  1. Range Flight Safety Requirements

    NASA Technical Reports Server (NTRS)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  2. NASA's Human Rating Requirements - A Historical Interpretive Perspective

    NASA Technical Reports Server (NTRS)

    Langford, Gerald; White, Juli Kramer

    2011-01-01

    Section 3.0 of NASA's Human Rating Requirements for Space Systems, NPR 8705.2, represents technical engineering requirements that the Agenc y requires of Human Space Systems. In many cases the requirements are not unlike requirements for any space system, crewed or uncrewed, th ey deal with successfully accomplishing the mission objectives. Howev er, they go one step further and have requirements that go beyond suc cessful completion of the mission and dictate functions or actions ne cessary to assure the survival of the crew. In that regard they are u nique from other space system requirements. Even with their uniquenes s the technical requirements of the NPR 8705.2 have been relatively u nchanged in overall intent over the revisions. They all have provided for system redundancy, crew habitable environment, crew situational awareness, crew operation, system control, emergency egress and abort systems. In a few cases the intent of the requirement was changed in tentionally, either to restrict certain types of systems or their fun ctions, or to encompass lessons learned from previous programs. For t he most part the requirements are non controversial and represent the current best practices for human space systems, however, a few requi rements are always debated and have evolved over revisions of the NPR due to studies conducted with various programs like the Orbital Spac e Plane and the Constellation Programs. Those requirements will be di scussed using results of trade studies conducted during past programs highlighting how these particular requirements have evolved through the revisions of the NPR. Comments will also be provided for requirem ents that although not debated, have provided challenges in interpret ation.

  3. Technical Assistance Project Map | State, Local, and Tribal Governments |

    Science.gov Websites

    ), NREL provides research to help stakeholders understand challenges and barriers to the development of offers various types of technical assistance to state and local governments. Clear All Filter by: State (0) All states Year (0) All years Type (0) All types Category (0) All categories Technical Assistance

  4. Development of U.S. Government General Technical Requirements for UAS Flight Safety Systems Utilizing the Iridium Satellite Constellation

    NASA Technical Reports Server (NTRS)

    Murray, Jennifer; Birr, Richard

    2010-01-01

    This slide presentation reviews the development of technical requirements for Unmanned Aircraft Systems (UAS) utilization of the Iridium Satellite Constellation to provide flight safety. The Federal Aviation Authority (FAA) required an over-the-horizon communication standard to guarantee flight safety before permitting widespread UAS flights in the National Air Space (NAS). This is important to ensure reliable control of UASs during loss-link and over-the-horizon scenarios. The core requirement was to utilize a satellite system to send GPS tracking data and other telemetry from a flight vehicle down to the ground. Iridium was chosen as the system because it is one of the only true satellite systems that has world wide coverage, and the service has a highly reliable link margin. The Iridium system, the flight modems, and the test flight are described.

  5. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  6. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  7. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  8. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  9. Challenges Faced by Female-Students in Engineering-Education

    ERIC Educational Resources Information Center

    Madara, Diana Starovoytova; Cherotich, Sharon

    2016-01-01

    Gender-related challenges in learning technical courses are universal phenomenon. These challenges could restrain female students from achieving their fullest potential. The main focus of this study, therefore, is to examine self-recognized challenges faced by undergraduate female students in pursuing engineering at the School of Engineering…

  10. Technical paper contest for women 1992. Space challenges: Earth and beyond

    NASA Technical Reports Server (NTRS)

    Orans, Robin (Editor)

    1993-01-01

    Two of the major concerns of the NASA Ames Research Center (NASA ARC) Advisory Committee for Women (ACW) are that recruitment of women scientists, engineers, and technicians needs to increase and that barriers to advancement need to be removed for improved representation of women in middle and upper management and scientific positions. One strategy that addressed this concern was the ACW sponsorship of a Technical Paper Contest for Women at Ames Research Center. Other sponsors of the Contest were the Ames Equal Opportunity Council and the Ames Contractor Council. The Technical Paper Contest for Women greatly increased the visibility of both the civil service women and the women who work for contractors at Ames. The women had the opportunity to hone their written and oral presentation skills. Networking among Ames women increased.

  11. The Technical Communicator as Corporate Spokesperson: A Public Relations Primer.

    ERIC Educational Resources Information Center

    Troester, Rod; Warburton, Terrence L.

    2001-01-01

    Examines the changing role of the technical communication professional in the rapidly evolving environment of organizational life. Presents five principles that serve as an initial step in laying a foundation for the preparation of technical communicators for the challenges and opportunities awaiting in contemporary organizations and the…

  12. Challenges of Human Space Flight

    NASA Technical Reports Server (NTRS)

    Davis, Jeffrey R.; Charles, John B.

    2006-01-01

    The presentations will be given during the X-Prize symposium, exploring the multi-faceted dimensions of spaceflight ranging from the technical developments necessary to achieve safe routine flight to and from and through space to the new personal business opportunities and economic benefits that will open in space and here on Earth. The symposium will delve into the technical, regulatory, market and financial needs and challenges that must be met in charting and executing the incremental developments leading to Personal Spaceflight and the opening of a Place Called Space. The presentation covers facets of human space flight including descriptions of life in space, the challenges of delivering medical care in space, and the preparations needed for safe and productive human travel to the moon and Mars.

  13. The role of non-technical skills in surgery

    PubMed Central

    Agha, Riaz A.; Fowler, Alexander J.; Sevdalis, Nick

    2015-01-01

    Non-technical skills are of increasing importance in surgery and surgical training. A traditional focus on technical skills acquisition and competence is no longer enough for the delivery of a modern, safe surgical practice. This review discusses the importance of non-technical skills and the values that underpin successful modern surgical practice. This narrative review used a number of sources including written and online, there was no specific search strategy of defined databases. Modern surgical practice requires; technical and non-technical skills, evidence-based practice, an emphasis on lifelong learning, monitoring of outcomes and a supportive institutional and health service framework. Finally these requirements need to be combined with a number of personal and professional values including integrity, professionalism and compassionate, patient-centred care. PMID:26904193

  14. Challenges for PISA

    ERIC Educational Resources Information Center

    Schleicher, Andreas

    2016-01-01

    The OECD Programme for International Student Assessment (PISA) provides a framework in which over 80 countries collaborate to build advanced global metrics to assess the knowledge, skills and character attributes of the students. The design of assessments poses major conceptual and technical challenges, as successful learning. Beyond a sound…

  15. The Limpopo Non-Metropolitan Drinking Water Supplier Response to a Diagnostic Tool for Technical Compliance

    PubMed Central

    Nefale, Avhashoni D.; Kamika, Ilunga; Obi, Chikwelu L.

    2017-01-01

    Water services providers should supply water that is fit for human consumption, taking into account multi-barrier approaches and technical aspects such as design aspects, operation monitoring, final water quality compliance monitoring, plant monitoring practices, maintenance, and risk management practices. Against this background, this study focused on applying the diagnostic tool for technical compliance as well as assessing the compliance of water treatment plants with management norms. Six plants in the Vhembe District Municipality were selected; the Vondo, Malamulele, Mutshedzi, and Mutale plants (conventional), and the Dzingahe and Tshedza package plants. During the first assessment, four (Malamulele, Mutshedzi, Mutale and Dzingahe) plants scored between 44% and 49% and achieved Class 3 certification, revealing serious challenges requiring immediate intervention. Two water plants (Vondo and Tshedza, scoring 53% and 63%, respectively) were in the Class 2 category, revealing serious challenges requiring attention and improvement. During the second assessment, all plants scored between 63% and 87% (Class 2 category). The greatest improvement (30%) was noted for the Dzingahe and Tshedza plants, followed by the Malamulele plant, while the Mutale, Vondo, and Mutshedzi plants improved their scores by 20%, 17% and 14%, respectively. After corrective actions and re-measurement, no plant complied. It is recommended that Water Services Providers (WSPs) regularly apply the diagnostic tools and water safety plans as developed in order to comply with applicable standards. PMID:28753964

  16. The Limpopo Non-Metropolitan Drinking Water Supplier Response to a Diagnostic Tool for Technical Compliance.

    PubMed

    Nefale, Avhashoni D; Kamika, Ilunga; Obi, Chikwelu L; Momba, Maggy Nb

    2017-07-19

    Water services providers should supply water that is fit for human consumption, taking into account multi-barrier approaches and technical aspects such as design aspects, operation monitoring, final water quality compliance monitoring, plant monitoring practices, maintenance, and risk management practices. Against this background, this study focused on applying the diagnostic tool for technical compliance as well as assessing the compliance of water treatment plants with management norms. Six plants in the Vhembe District Municipality were selected; the Vondo, Malamulele, Mutshedzi, and Mutale plants (conventional), and the Dzingahe and Tshedza package plants. During the first assessment, four (Malamulele, Mutshedzi, Mutale and Dzingahe) plants scored between 44% and 49% and achieved Class 3 certification, revealing serious challenges requiring immediate intervention. Two water plants (Vondo and Tshedza, scoring 53% and 63%, respectively) were in the Class 2 category, revealing serious challenges requiring attention and improvement. During the second assessment, all plants scored between 63% and 87% (Class 2 category). The greatest improvement (30%) was noted for the Dzingahe and Tshedza plants, followed by the Malamulele plant, while the Mutale, Vondo, and Mutshedzi plants improved their scores by 20%, 17% and 14%, respectively. After corrective actions and re-measurement, no plant complied. It is recommended that Water Services Providers (WSPs) regularly apply the diagnostic tools and water safety plans as developed in order to comply with applicable standards.

  17. SREM (Software Requirements Engineering Methodology) Evaluation. Volume 2. Specifications and Technical Data.

    DTIC Science & Technology

    1984-02-01

    and is approved for publication. APPROVED: ’"" " Project Engineer APPROVED:k 1 4 RAYMOND P. URTZ, JR. Acting Technical Director Command and Control ...Technical Director Command and Control Division FOR THE COMMANDER: JOHN A. RITZ Acting Chief, Plans Office If your address has changed or if you wish to be...179 55812203 Denver CO 80201 55812203 I. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Rome Air Development Center (COEE) February 1984 Griffiss

  18. Membranes for bioelectrochemical systems: challenges and research advances.

    PubMed

    Dhar, Bipro Ranjan; Lee, Hyung-Sool

    2013-01-01

    Increasing energy demand has been a big challenge for current society, as the fossil fuel sources are gradually decreasing. Hence, development of renewable and sustainable energy sources for the future is considered one of the top priorities in national strategic plans. Bioenergy can meet future energy requirements - renewability, sustainability, and even carbon-neutrality. Bioenergy production from wastes and wastewaters is especially attractive because of dual benefits of energy generation and contaminant stabilization. There are several bioenergy technologies using wastes and wastewaters as electron donor, which include anaerobic digestion, dark biohydrogen fermentation, biohydrogen production using photosynthetic microorganisms, and bioelectrochemical systems (BESs). Among them BES seems to be very promising as we can produce a variety of value-added products from wastes and wastewaters, such as electric power, hydrogen gas, hydrogen peroxide, acetate, ethanol etc. Most ofthe traditional BES uses a membrane to separate the anode and cathode chamber, which is essential for improving microbial metabolism on the anode and the recovery of value-added products on the cathode. Performance of BES lacking a membrane can be seriously deteriorated, due to oxygen diffusion or substantial loss of synthesized products. For this reason, usage of a membrane seems essential to facilitate BES performance. However, a membrane can bring several technical challenges to BES application compared to membrane-less BES. These challenges include poor proton permeability, substrate loss, oxygen back diffusion, pH gradient, internal resistance, biofouling, etc. This paper aims to review the major technical barriers associated with membranes and future research directions for their application in BESs.

  19. SAM Technical Contacts

    EPA Pesticide Factsheets

    These technical contacts are available to help with questions regarding method deviations, modifications, sample problems or interferences, quality control requirements, the use of alternative methods, or the need to address analytes or sample types.

  20. Challenges and requirements of mask data processing for multi-beam mask writer

    NASA Astrophysics Data System (ADS)

    Choi, Jin; Lee, Dong Hyun; Park, Sinjeung; Lee, SookHyun; Tamamushi, Shuichi; Shin, In Kyun; Jeon, Chan Uk

    2015-07-01

    To overcome the resolution and throughput of current mask writer for advanced lithography technologies, the platform of e-beam writer have been evolved by the developments of hardware and software in writer. Especially, aggressive optical proximity correction (OPC) for unprecedented extension of optical lithography and the needs of low sensitivity resist for high resolution result in the limit of variable shaped beam writer which is widely used for mass production. The multi-beam mask writer is attractive candidate for photomask writing of sub-10nm device because of its high speed and the large degree of freedom which enable high dose and dose modulation for each pixel. However, the higher dose and almost unlimited appetite for dose modulation challenge the mask data processing (MDP) in aspects of extreme data volume and correction method. Here, we discuss the requirements of mask data processing for multi-beam mask writer and presents new challenges of the data format, data flow, and correction method for user and supplier MDP tool.

  1. PET/MRI – Technical Review

    PubMed Central

    Muzic, Raymond F.; DiFilippo, Frank P.

    2015-01-01

    PET/MR is a hybrid imaging technology with the potential to combine the molecular and functional information of PET with the soft-tissue contrast of MR. Herein we review the technical features and challenges of putting these different technologies together. We emphasize the conceptual to make the material accessible to a wide audience. We begin by reviewing PET/CT, a more mature multi-modality imaging technology, to provide a basis for comparison to the history of PET/MR development. We discuss the motivation and challenges of PET/MR and different approaches that have been used to meet the challenges. We conclude with a speculation about the future of this exciting imaging method. PMID:25497909

  2. Technical Education and Resource Material.

    ERIC Educational Resources Information Center

    Mills, Marie T.

    New approaches and many technical innovations will be required by the junior college to meet the increasing educational needs of technical occupations. A first is information on which the prospective student can base an intelligent choice of occupation. For this he must have a precise job description to determine whether the career fits his…

  3. Quality Career/Technical Programs Prepare Students to Succeed in a New, More Challenging Economy

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2008

    2008-01-01

    Quality career/technical education and its role in school improvement was a primary theme of the 2008 "High Schools That Work" ("HSTW") Staff Development Conference. This newsletter covers crucial topics in quality CTE (career and technical education), including assessing the quality and effectiveness of CT programs, preparing students to succeed…

  4. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...

  5. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...

  6. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  7. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  8. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  9. NetView technical research

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.

  10. Dental implants modified with drug releasing titania nanotubes: therapeutic potential and developmental challenges.

    PubMed

    Gulati, Karan; Ivanovski, Sašo

    2017-08-01

    The transmucosal nature of dental implants presents a unique therapeutic challenge, requiring not only rapid establishment and subsequent maintenance of osseointegration, but also the formation of resilient soft tissue integration. Key challenges in achieving long-term success are sub-optimal bone integration in compromised bone conditions and impaired trans-mucosal tissue integration in the presence of a persistent oral microbial biofilm. These challenges can be targeted by employing a drug-releasing implant modification such as TiO 2 nanotubes (TNTs), engineered on titanium surfaces via electrochemical anodization. Areas covered: This review focuses on applications of TNT-based dental implants towards achieving optimal therapeutic efficacy. Firstly, the functions of TNT implants will be explored in terms of their influence on osseointegration, soft tissue integration and immunomodulation. Secondly, the developmental challenges associated with such implants are reviewed including sterilization, stability and toxicity. Expert opinion: The potential of TNTs is yet to be fully explored in the context of the complex oral environment, including appropriate modulation of alveolar bone healing, immune-inflammatory processes, and soft tissue responses. Besides long-term in vivo assessment under masticatory loading conditions, investigating drug-release profiles in vivo and addressing various technical challenges are required to bridge the gap between research and clinical dentistry.

  11. Human Resource Development: Technical Education's Challenge. Proceedings of the Annual National Clinic on Technical Education (12th, Spokane, Washington, March 26-28, 1975).

    ERIC Educational Resources Information Center

    Washington State Community Coll. District 17, Spokane.

    Speeches and discussions are transcribed in this report, which also includes a listing of the American Technical Education Association (ATEA) committee members, exhibitors, officers, and directory of speakers. Speeches covered "Human Resource Development" by Gene Rutledge; "The Impact of Technical Education on Economic…

  12. Measures of Success: A Survey of Selected Vocational and Technical Education Programs in Florida which Train Students in Occupations Requiring Licenses.

    ERIC Educational Resources Information Center

    Florida State Advisory Council on Vocational and Technical Education, Tallahassee.

    A study of 13 vocational and technical education programs in Florida was conducted which represented an attempt to identify valid and reliable sources of data whereby some vocational programs might be evaluated in specified terms of effectiveness. The programs selected for study were among those which require graduating students to pass licensing…

  13. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  14. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  15. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  16. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  17. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  18. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  19. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  20. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  1. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  2. AIMES Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katz, Daniel S; Jha, Shantenu; Weissman, Jon

    2017-01-31

    This is the final technical report for the AIMES project. Many important advances in science and engineering are due to large-scale distributed computing. Notwithstanding this reliance, we are still learning how to design and deploy large-scale production Distributed Computing Infrastructures (DCI). This is evidenced by missing design principles for DCI, and an absence of generally acceptable and usable distributed computing abstractions. The AIMES project was conceived against this backdrop, following on the heels of a comprehensive survey of scientific distributed applications. AIMES laid the foundations to address the tripartite challenge of dynamic resource management, integrating information, and portable and interoperablemore » distributed applications. Four abstractions were defined and implemented: skeleton, resource bundle, pilot, and execution strategy. The four abstractions were implemented into software modules and then aggregated into the AIMES middleware. This middleware successfully integrates information across the application layer (skeletons) and resource layer (Bundles), derives a suitable execution strategy for the given skeleton and enacts its execution by means of pilots on one or more resources, depending on the application requirements, and resource availabilities and capabilities.« less

  3. AIMES Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weissman, Jon; Katz, Dan; Jha, Shantenu

    2017-01-31

    This is the final technical report for the AIMES project. Many important advances in science and engineering are due to large scale distributed computing. Notwithstanding this reliance, we are still learning how to design and deploy large-scale production Distributed Computing Infrastructures (DCI). This is evidenced by missing design principles for DCI, and an absence of generally acceptable and usable distributed computing abstractions. The AIMES project was conceived against this backdrop, following on the heels of a comprehensive survey of scientific distributed applications. AIMES laid the foundations to address the tripartite challenge of dynamic resource management, integrating information, and portable andmore » interoperable distributed applications. Four abstractions were defined and implemented: skeleton, resource bundle, pilot, and execution strategy. The four abstractions were implemented into software modules and then aggregated into the AIMES middleware. This middleware successfully integrates information across the application layer (skeletons) and resource layer (Bundles), derives a suitable execution strategy for the given skeleton and enacts its execution by means of pilots on one or more resources, depending on the application requirements, and resource availabilities and capabilities.« less

  4. Proceedings of the Annual National Clinic on Technical Education (12th, Spokane, Washington, March 26-28, 1975). Human Resource Development: Technical Education's Challenge.

    ERIC Educational Resources Information Center

    Rutledge, Gene; And Others

    This report includes the presentations of the speakers appearing before the National Clinic on Technical Education. Topics cover human resource development; the impact of technical education on economic development (in Mississippi); economics of allied health education; manpower implications of environmental protection; manpower needs for…

  5. Silicon photonics and challenges for fabrication

    NASA Astrophysics Data System (ADS)

    Feilchenfeld, N. B.; Nummy, K.; Barwicz, T.; Gill, D.; Kiewra, E.; Leidy, R.; Orcutt, J. S.; Rosenberg, J.; Stricker, A. D.; Whiting, C.; Ayala, J.; Cucci, B.; Dang, D.; Doan, T.; Ghosal, M.; Khater, M.; McLean, K.; Porth, B.; Sowinski, Z.; Willets, C.; Xiong, C.; Yu, C.; Yum, S.; Giewont, K.; Green, W. M. J.

    2017-03-01

    Silicon photonics is rapidly becoming the key enabler for meeting the future data speed and volume required by the Internet of Things. A stable manufacturing process is needed to deliver cost and yield expectations to the technology marketplace. We present the key challenges and technical results from both 200mm and 300mm facilities for a silicon photonics fabrication process which includes monolithic integration with CMOS. This includes waveguide patterning, optical proximity correction for photonic devices, silicon thickness uniformity and thick material patterning for passive fiber to waveguide alignment. The device and process metrics show that the transfer of the silicon photonics process from 200mm to 300mm will provide a stable high volume manufacturing platform for silicon photonics designs.

  6. Advanced technical skills are required for microsurgical clipping of posterior communicating artery aneurysms in the endovascular era.

    PubMed

    Sanai, Nader; Caldwell, Nolan; Englot, Dario J; Lawton, Michael T

    2012-08-01

    Many neurosurgeons feel competent clipping posterior communicating artery (PCoA) aneurysms and include this lesion in their practice. However, endovascular therapy removes simple aneurysms that would have been easiest to clip with the best results. What remains are aneurysms with complex anatomy and technical challenges that are not well described. A contemporary surgical series with PCoA aneurysms is reviewed to define the patients, microsurgical techniques, and outcomes in current practice. A total of 218 patients had 218 PCoA aneurysms that were treated microsurgically during an 11-year period. Complexities influencing aneurysm management included (1) large/giant size; (2) fetal posterior cerebral artery; (3) previous coiling; (4) anterior clinoidectomy; (5) adherence of the anterior choroidal artery (AChA); (6) intraoperative aneurysm rupture; (7) complex clipping; and (8) atherosclerotic calcification. Simple PCoA aneurysms were encountered in 113 patients (51.8%) and complex aneurysms in 105 (48.2%). Adherent AChA (13.8%) and intraoperative rupture (11.5%) were the most common complexities. Simple aneurysms had favorable outcomes in 86.6% of patients, whereas aneurysms with 1 or multiple complexities had favorable outcomes in 78.2% and 75.0%, respectively. Intraoperative rupture (P < .01), large/giant size (P = .04), and complex clipping (P = .05) were associated with increased neurological worsening. Because endovascular therapy alters the surgical population, neurosurgeons should recalibrate their expectations with this once straightforward aneurysm. The current mix of PCoA aneurysms requires advanced techniques including clinoidectomy, AChA microdissection, complex clipping, and facility with intraoperative rupture. Microsurgery is recommended for recurrent aneurysms after coiling, complex branches, aneurysms causing oculomotor nerve palsy, multiple aneurysms, and patients with hematomas.

  7. 42 CFR 493.1411 - Standard; Technical consultant qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... training or experience to provide technical consultation for each of the specialties and subspecialties of... responsible. Note: The technical consultant requirements for “laboratory training or experience, or both” in... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; Technical consultant qualifications. 493...

  8. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  9. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  10. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  11. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  12. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  13. Integrating Space Flight Resource Management Skills into Technical Lessons for International Space Station Flight Controller Training

    NASA Technical Reports Server (NTRS)

    Baldwin, Evelyn

    2008-01-01

    The Johnson Space Center s (JSC) International Space Station (ISS) Space Flight Resource Management (SFRM) training program is designed to teach the team skills required to be an effective flight controller. It was adapted from the SFRM training given to Shuttle flight controllers to fit the needs of a "24 hours a day/365 days a year" flight controller. More recently, the length reduction of technical training flows for ISS flight controllers impacted the number of opportunities for fully integrated team scenario based training, where most SFRM training occurred. Thus, the ISS SFRM training program is evolving yet again, using a new approach of teaching and evaluating SFRM alongside of technical materials. Because there are very few models in other industries that have successfully tied team and technical skills together, challenges are arising. Despite this, the Mission Operations Directorate of NASA s JSC is committed to implementing this integrated training approach because of the anticipated benefits.

  14. [Urotechnology: a new interdisciplinary platform for promoting and managing of technical innovations in urology].

    PubMed

    Miernik, A; Becker, C; Wullich, B; Schoenthaler, M; Arnolds, B J; Wetterauer, U

    2015-01-01

    The innovative power in medical engineering and technology development requires a close cooperation between universities and non-university research institutions and a collaboration with industrial partners. German knowledge in the fields of video and micro-optics, microsystem technology and of informational technology and software applications seem to be highly competitive at international level. Germany's previous leadership in the development of technical equipment will be challenged by today's requirements and difficulties in medical engineering. Research and expenses demands for the development of novel medical instruments, products and applications will increase continuously. Transparency and coordinated collaboration between universities and industrial partners will contribute to a substantial improvement in surgical therapy. Medical technology of the future, including urotechnology, requires professional structures and coordination and will have to be based on evidence.

  15. Nm-scale spatial resolution x-ray imaging with MLL nanofocusing optics: instrumentational requirements and challenges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nazaretski, E.; Yan, H.; Lauer, K.

    2016-08-30

    The Hard X-ray Nanoprobe (HXN) beamline at NSLS-II has been designed and constructed to enable imaging experiments with unprecedented spatial resolution and detection sensitivity. The HXN X-ray Microscope is a key instrument for the beamline, providing a suite of experimental capabilities which includes scanning fluorescence, diffraction, differential phase contrast and ptychography utilizing Multilayer Laue Lenses (MLL) and zoneplate (ZP) as nanofocusing optics. In this paper, we present technical requirements for the MLL-based scanning microscope, outline the development concept and present first ~15 x 15 nm 2 spatial resolution x-ray fluorescence images.

  16. Accelerator physics and technology challenges of very high energy hadron colliders

    NASA Astrophysics Data System (ADS)

    Shiltsev, Vladimir D.

    2015-08-01

    High energy hadron colliders have been in the forefront of particle physics for more than three decades. At present, international particle physics community considers several options for a 100 TeV proton-proton collider as a possible post-LHC energy frontier facility. The method of colliding beams has not fully exhausted its potential but has slowed down considerably in its progress. This paper briefly reviews the accelerator physics and technology challenges of the future very high energy colliders and outlines the areas of required research and development towards their technical and financial feasibility.

  17. Accelerator physics and technology challenges of very high energy hadron colliders

    DOE PAGES

    Shiltsev, Vladimir D.

    2015-08-20

    High energy hadron colliders have been in the forefront of particle physics for more than three decades. At present, international particle physics community considers several options for a 100 TeV proton–proton collider as a possible post-LHC energy frontier facility. The method of colliding beams has not fully exhausted its potential but has slowed down considerably in its progress. This article briefly reviews the accelerator physics and technology challenges of the future very high energy colliders and outlines the areas of required research and development towards their technical and financial feasibility.

  18. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  19. 76 FR 80226 - Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... final rule, effective upon publication. Generally, the Administrative Procedure Act (APA) requires a.... Additionally, the APA requires that a final rule must have a delayed effective date of 30 days from the date of... delayed effective date requirement under the APA. 5 U.S.C. 553(d)(3). Again the technical change conforms...

  20. [The LESS (Laparo-endoscopic Single-Site) procedure in urology. Technical and clinical aspects].

    PubMed

    Neri, F; Cindolo, L; Gidaro, S; Schips, L

    2010-01-01

    Minimally invasive urology is rapidly advancing, and single-site laparoscopic surgery is being explored clinically. Such laparoscopic procedures are technically challenging and require an experienced laparoscopic surgeon due to the lack of port placement triangulation and instrument clashing. In the last years several surgeons all over the world have explored the feasibility and safety of LESS using several and different ports, approaches and devices. Hundreds of procedures have been described with overall favorable intraoperative and postoperative outcomes. Our experience consists of more than 30 procedures successfully completed for adrenal, kidney disease and varicocele. To date, LESS could be considered feasible and effective using currently available devices, however it is to be considered as an initial status technique requiring further confirmatory studies and advanced laparoscopic skills.

  1. 25 CFR 23.42 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Technical assistance. 23.42 Section 23.42 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT General and Uniform Grant Administration Provisions and Requirements § 23.42 Technical assistance. (a) Pre-award and...

  2. Requirements for guidelines systems: implementation challenges and lessons from existing software-engineering efforts.

    PubMed

    Shah, Hemant; Allard, Raymond D; Enberg, Robert; Krishnan, Ganesh; Williams, Patricia; Nadkarni, Prakash M

    2012-03-09

    A large body of work in the clinical guidelines field has identified requirements for guideline systems, but there are formidable challenges in translating such requirements into production-quality systems that can be used in routine patient care. Detailed analysis of requirements from an implementation perspective can be useful in helping define sub-requirements to the point where they are implementable. Further, additional requirements emerge as a result of such analysis. During such an analysis, study of examples of existing, software-engineering efforts in non-biomedical fields can provide useful signposts to the implementer of a clinical guideline system. In addition to requirements described by guideline-system authors, comparative reviews of such systems, and publications discussing information needs for guideline systems and clinical decision support systems in general, we have incorporated additional requirements related to production-system robustness and functionality from publications in the business workflow domain, in addition to drawing on our own experience in the development of the Proteus guideline system (http://proteme.org). The sub-requirements are discussed by conveniently grouping them into the categories used by the review of Isern and Moreno 2008. We cite previous work under each category and then provide sub-requirements under each category, and provide example of similar work in software-engineering efforts that have addressed a similar problem in a non-biomedical context. When analyzing requirements from the implementation viewpoint, knowledge of successes and failures in related software-engineering efforts can guide implementers in the choice of effective design and development strategies.

  3. Requirements for guidelines systems: implementation challenges and lessons from existing software-engineering efforts

    PubMed Central

    2012-01-01

    Background A large body of work in the clinical guidelines field has identified requirements for guideline systems, but there are formidable challenges in translating such requirements into production-quality systems that can be used in routine patient care. Detailed analysis of requirements from an implementation perspective can be useful in helping define sub-requirements to the point where they are implementable. Further, additional requirements emerge as a result of such analysis. During such an analysis, study of examples of existing, software-engineering efforts in non-biomedical fields can provide useful signposts to the implementer of a clinical guideline system. Methods In addition to requirements described by guideline-system authors, comparative reviews of such systems, and publications discussing information needs for guideline systems and clinical decision support systems in general, we have incorporated additional requirements related to production-system robustness and functionality from publications in the business workflow domain, in addition to drawing on our own experience in the development of the Proteus guideline system (http://proteme.org). Results The sub-requirements are discussed by conveniently grouping them into the categories used by the review of Isern and Moreno 2008. We cite previous work under each category and then provide sub-requirements under each category, and provide example of similar work in software-engineering efforts that have addressed a similar problem in a non-biomedical context. Conclusions When analyzing requirements from the implementation viewpoint, knowledge of successes and failures in related software-engineering efforts can guide implementers in the choice of effective design and development strategies. PMID:22405400

  4. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  5. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  6. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  7. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  8. The MedlinePlus public user interface: studies of design challenges and opportunities.

    PubMed

    Marill, Jennifer L; Miller, Naomi; Kitendaugh, Paula

    2006-01-01

    What are the challenges involved in designing, modifying, and improving a major health information portal that serves over sixty million page views a month? MedlinePlus, the National Library of Medicine's (NLM's) consumer health Website, is examined. Challenges are presented as six "studies," which describe selected design issues and how NLM staff resolved them. Improving MedlinePlus is an iterative process. Changes in the public user interface are ongoing, reflecting Web design trends, usability testing recommendations, user survey results, new technical requirements, and the need to grow the site in an orderly way. Testing and analysis should accompany Website design modifications. New technologies may enhance a site but also introduce problems. Further modifications to MedlinePlus will be informed by the experiences described here.

  9. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  10. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  11. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  12. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  13. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  14. Challenges in Requirements Engineering: A Research Agenda for Conceptual Modeling

    NASA Astrophysics Data System (ADS)

    March, Salvatore T.; Allen, Gove N.

    Domains for which information systems are developed deal primarily with social constructions—conceptual objects and attributes created by human intentions and for human purposes. Information systems play an active role in these domains. They document the creation of new conceptual objects, record and ascribe values to their attributes, initiate actions within the domain, track activities performed, and infer conclusions based on the application of rules that govern how the domain is affected when socially-defined and identified causal events occur. Emerging applications of information technologies evaluate such business rules, learn from experience, and adapt to changes in the domain. Conceptual modeling grammars aimed at representing their system requirements must include conceptual objects, socially-defined events, and the rules pertaining to them. We identify challenges to conceptual modeling research and pose an ontology of the artificial as a step toward meeting them.

  15. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  16. A Summary of Technical Problems Associated With Broadband Cable Teleservices Development. A Survey of Technical Requirements for Broadband Cable Teleservices; Volume One.

    ERIC Educational Resources Information Center

    McManamon, P. M.; Utlaut, W. F.

    The results of a survey of cable television (CATV) and related technological industries are summarized. In this, the first of a series of seven reports, attention is focused upon some major technical factors which need to be considered in order that a transition from the technical state of today's cable television and services to new teleservices…

  17. OSH technical reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less

  18. Do technical skills correlate with non-technical skills in crisis resource management: a simulation study.

    PubMed

    Riem, N; Boet, S; Bould, M D; Tavares, W; Naik, V N

    2012-11-01

    Both technical skills (TS) and non-technical skills (NTS) are key to ensuring patient safety in acute care practice and effective crisis management. These skills are often taught and assessed separately. We hypothesized that TS and NTS are not independent of each other, and we aimed to evaluate the relationship between TS and NTS during a simulated intraoperative crisis scenario. This study was a retrospective analysis of performances from a previously published work. After institutional ethics approval, 50 anaesthesiology residents managed a simulated crisis scenario of an intraoperative cardiac arrest secondary to a malignant arrhythmia. We used a modified Delphi approach to design a TS checklist, specific for the management of a malignant arrhythmia requiring defibrillation. All scenarios were recorded. Each performance was analysed by four independent experts. For each performance, two experts independently rated the technical performance using the TS checklist, and two other experts independently rated NTS using the Anaesthetists' Non-Technical Skills score. TS and NTS were significantly correlated to each other (r=0.45, P<0.05). During a simulated 5 min resuscitation requiring crisis resource management, our results indicate that TS and NTS are related to one another. This research provides the basis for future studies evaluating the nature of this relationship, the influence of NTS training on the performance of TS, and to determine whether NTS are generic and transferrable between crises that require different TS.

  19. Enterprise Implementation of Digital Pathology: Feasibility, Challenges, and Opportunities.

    PubMed

    Hartman, D J; Pantanowitz, L; McHugh, J S; Piccoli, A L; OLeary, M J; Lauro, G R

    2017-10-01

    Digital pathology is becoming technically possible to implement for routine pathology work. At our institution, we have been using digital pathology for second opinion intraoperative consultations for over 10 years. Herein, we describe our experience in converting to a digital pathology platform for primary pathology diagnosis. We implemented an incremental rollout for digital pathology on subspecialty benches, beginning with cases that contained small amounts of tissue (biopsy specimens). We successfully scanned over 40,000 slides through our digital pathology system. Several lessons (both challenges and opportunities) were learned through this implementation. A successful conversion to digital pathology requires pre-imaging adjustments, integrated software and post-imaging evaluations.

  20. Artwork as Technics

    ERIC Educational Resources Information Center

    Jackson, Mark

    2016-01-01

    "Artwork as technics" opens discussion on activating aesthetics in educational contexts by arguing that we require some fundamental revision in understanding relations between aesthetics and technology in contexts where education is primarily encountered instrumentally and technologically. The paper addresses this through the writing of…

  1. Remediation of Highland Drive Landfill: Technical Challenges of Segregating Co-Mingled LLRW and Municipal Solid Waste in an Urbanized Area - 13319

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniel, Jeff; Lawrence, Dave; Case, Glenn

    Highland Drive Landfill is an inactive Municipal Solid Waste (MSW) Landfill which received waste from the 1940's until its closure in 1991. During a portion of its active life, the Landfill received low-level radioactive waste (LLRW) which currently exists both in a defined layer and co-mingled with MSW. Remediation of this site to remove the LLRW to meet established cleanup criteria, forms part of the Port Hope Project being undertaken by Atomic Energy Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). The total volume of LLRW and co-mingledmore » LLRW/MSW estimated to require removal from the Highland Drive Landfill is approximately 51,900 cubic metres (m{sup 3}). The segregation and removal of LLRW at the Highland Drive Landfill presents a number of unique technical challenges due to the co-mingled waste and location of the Landfill in an urbanized area. Key challenges addressed as part of the design process included: delineation of the extent of LLRW, development of cut lines, and estimation of the quantity of co-mingled LLRW in a heterogeneous matrix; protection of adjacent receptors in a manner which would not impact the use of adjacent facilities which include residences, a recreational facility, and a school; coordination and phasing of the work to allow management of six separate material streams including clean soil, MSW, co-mingled LLRW/MSW, LLRW, un-impacted water, and impacted water/leachate within a confined environment; and development of a multi-tiered and adaptive program of monitoring and control measures for odour, dust, and water including assessment of risk of exceedance of monitoring criteria. In addition to ensuring public safety and protection of the environment during remedy implementation, significant effort in the design process was paid to balancing the advantages of increased certainty, including higher production rates, against the costs of attaining

  2. Current challenges in meeting global iodine requirements.

    PubMed

    Eastman, Creswell J; Jooste, Pieter

    2012-01-01

    Iodine deficiency is a global problem of immense magnitude afflicting 2 billion of the world's population. The adverse effects of iodine deficiency in humans, collectively termed iodine deficiency disorders, result from decreased thyroid hormone production and action, and vary in severity from thyroid enlargement (goiter) to severe, irreversible brain damage, termed endemic cretinism. Thyroid hormone is essential throughout life, but it is critical for normal brain development in the fetus and throughout childhood. During pregnancy, maternal thyroid hormone production must increase by 25-50% to meet maternal-fetal requirements. The principal sources of iodine in the diet include milk and dairy products, seafoods and foods with added iodized salt. Vegetables, fruits and cereals are generally poor sources of iodine because most of our soils and water supplies are deficient in iodine. The accepted solution to the problem is Universal Salt Iodization where all salt for human and animal consumption is iodized at a level of 20-40 µg/g. In principle, mandatory fortification represents the most effective public health strategy where safety and efficacy can be assured and there is a demonstrated need for the nutrient in the population. Voluntary fortification of salt and other foods has many limitations and few benefits. Iodine supplementation is a useful, but expensive, inefficient and unsustainable strategy for preventing iodine deficiency. The current worldwide push to decrease salt intake to prevent cardiovascular disease presents an entirely new challenge in addressing iodine deficiency in both developing and developed countries. Copyright © 2012 S. Karger AG, Basel.

  3. Challenges and opportunities for structural DNA nanotechnology

    PubMed Central

    Pinheiro, Andre V.; Han, Dongran; Shih, William M.; Yan, Hao

    2012-01-01

    DNA molecules have been used to build a variety of nanoscale structures and devices over the past 30 years, and potential applications have begun to emerge. But the development of more advanced structures and applications will require a number of issues to be addressed, the most significant of which are the high cost of DNA and the high error rate of self-assembly. Here we examine the technical challenges in the field of structural DNA nanotechnology and outline some of the promising applications that could be developed if these hurdles can be overcome. In particular, we highlight the potential use of DNA nanostructures in molecular and cellular biophysics, as biomimetic systems, in energy transfer and photonics, and in diagnostics and therapeutics for human health. PMID:22056726

  4. Climate Change Challenges for Extension Educators: Technical Capacity and Cultural Attitudes

    ERIC Educational Resources Information Center

    Becerra, Terrie A.; Middendorf, Gerad; Campbell, Amber; Tomlinson, Peter

    2016-01-01

    We surveyed Extension educators in the southern Great Plains about their attitudes and beliefs regarding climate change, their interactions with constituents surrounding climate change, and challenges they face in engaging constituents on the topic of climate change. Production-oriented and sociocultural challenges in meeting constituents'…

  5. Terabit Wireless Communication Challenges

    NASA Technical Reports Server (NTRS)

    Hwu, Shian U.

    2012-01-01

    This presentation briefly discusses a research effort on Terabit Wireless communication systems for possible space applications. Recently, terahertz (THz) technology (300-3000 GHz frequency) has attracted a great deal of interest from academia and industry. This is due to a number of interesting features of THz waves, including the nearly unlimited bandwidths available, and the non-ionizing radiation nature which does not damage human tissues and DNA with minimum health threat. Also, as millimeter-wave communication systems mature, the focus of research is, naturally, moving to the THz range. Many scientists regard THz as the last great frontier of the electromagnetic spectrum, but finding new applications outside the traditional niches of radio astronomy, Earth and planetary remote sensing, and molecular spectroscopy particularly in biomedical imaging and wireless communications has been relatively slow. Radiologists find this area of study so attractive because t-rays are non-ionizing, which suggests no harm is done to tissue or DNA. They also offer the possibility of performing spectroscopic measurements over a very wide frequency range, and can even capture signatures from liquids and solids. According to Shannon theory, the broad bandwidth of the THz frequency bands can be used for terabit-per-second (Tb/s) wireless communication systems. This enables several new applications, such as cell phones with 360 degrees autostereoscopic displays, optic-fiber replacement, and wireless Tb/s file transferring. Although THz technology could satisfy the demand for an extremely high data rate, a number of technical challenges need to be overcome before its development. This presentation provides an overview the state-of-the- art in THz wireless communication and the technical challenges for an emerging application in Terabit wireless systems. The main issue for THz wave propagation is the high atmospheric attenuation, which is dominated by water vapor absorption in the THz

  6. A review of Integrated Vehicle Health Management tools for legacy platforms: Challenges and opportunities

    NASA Astrophysics Data System (ADS)

    Esperon-Miguez, Manuel; John, Philip; Jennions, Ian K.

    2013-01-01

    Integrated Vehicle Health Management (IVHM) comprises a set of tools, technologies and techniques for automated detection, diagnosis and prognosis of faults in order to support platforms more efficiently. Specific challenges are faced when IVHM tools are to be retrofitted into legacy vehicles since major modifications are much more challenging than with platforms whose design can still be modified. The topics covered in this Review Paper include the state of the art of IVHM tools and how their characteristics match the requirements of legacy aircraft, a summary of problems faced in the past trying to retrofit IVHM tools both from a technical and organisational perspective and the current level of implementation of IVHM in industry. Although the technology has not reached the level necessary to implement IVHM to its full potential on every kind of component, significant progress has been achieved on rotating equipment, structures or electronics. Attempts to retrofit some of these tools in the past faced both technical difficulties and opposition by some stakeholders, the later being responsible for the failure of technically sound projects in more than one occasion. Nevertheless, despite these difficulties, products and services based on IVHM technology have started to be offered by the manufacturers and, what is more important, demanded by the operators, providing guidance on what the industry would demand from IVHM on legacy aircraft.

  7. Centennial Challenges Program

    NASA Technical Reports Server (NTRS)

    Ortega, Sam; Eberly, Eric

    2015-01-01

    NASA's Centennial Challenges Program was initiated in 2005 to directly engage the public in the process of advanced technology development. The program offers incentive prizes to generate revolutionary solutions to problems of interest to NASA and the nation. The program seeks innovations from diverse and nontraditional sources. Competitors are not supported by government funding and awards are only made to successful teams when the challenges are met. In keeping with the spirit of the Wright Brothers and other American innovators, the Centennial Challenge prizes are offered to independent inventors including small businesses, student groups, and individuals. These independent inventors are sought to generate innovative solutions for technical problems of interest to NASA and the nation and to provide them with the opportunity to stimulate or create new business ventures.

  8. Web-based technical assistance and training to promote community tobacco control policy change.

    PubMed

    Young, Walter F; Montgomery, Debbie; Nycum, Colleen; Burns-Martin, Lavon; Buller, David B

    2006-01-01

    In 1998 the tobacco industry was released of claims that provided monetary relief for states. A significant expansion of tobacco control activity in many states created a need to develop local capacity. Technical assistance and training for new and experienced staff became a significant challenge for tobacco control leadership. In Colorado, this challenge was addressed in part through the development of a technical assistance and training Web site designed for local tobacco control staff and coalition members. Researchers, technical Web site development specialists, state health agency, and state tobacco control coalition staff collaborated to develop, promote, and test the efficacy of this Web site. The work group embodied a range of skills including tobacco control, Web site technical development, marketing, training, and project management. Persistent marketing, updating of Web site content, and institutionalizing it as a principal source of information and training were key to use by community coalition members.

  9. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  10. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  11. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  12. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  13. 19 CFR 115.51 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS... submitted for inspection for individual approval must comply with the requirements of Annex 2 of the Customs...

  14. 16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  15. Developing non-technical ward-round skills.

    PubMed

    Harvey, Rachel; Mellanby, Edward; Dearden, Effie; Medjoub, Karima; Edgar, Simon

    2015-10-01

    Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform. There is evidence that newly qualified doctors are not adequately prepared by their undergraduate experiences for this task. The aim of this study was to analyse the challenges pertaining to non-technical skills that students would face during ward rounds, and to create a model that facilitates the transition from medical student to doctor. A total of 217 final-year medical students completed a simulated ward round. Free-text responses were analysed using template analysis applying an a priori template developed from the literature by the research team. This drew on the generic categories of non-technical skills suggested by Flin et al. Ninety-seven per cent of students agreed or strongly agreed that the simulated ward round improved their insight into the challenges of ward rounds and their perceived ability to work efficiently as an active member of the ward round. The responding students (206) submitted written feedback describing the learning that they planned to use: 800 learning points were recorded, and all could be categorised into one of seven non-technical skills. Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform We believe that improved task efficiency and insight into the challenges of the ward round gained by medical students will lead to an enhancement in performance during clinical rounds, and will have a positive impact on patient safety. We would suggest that undergraduate medical schools consider this model in the preparation for the clinical practice element of the curriculum. © 2015 John Wiley & Sons Ltd.

  16. A Qualitative Study of the Job Challenges of Instructional Deans in the Technical College System of Georgia

    ERIC Educational Resources Information Center

    Alford, Perrin J.

    2014-01-01

    The Technical College System of Georgia serves the people and the state by creating a system of technical education whose purpose is to use the latest technology and easy access for all adult Georgians and corporate citizens. Within each technical college is a hierarchy of faculty, staff, and administrators. The instructional deans serve a vital…

  17. System Engineering and Technical Challenges Overcome in the J-2X Rocket Engine Development Project

    NASA Technical Reports Server (NTRS)

    Ballard, Richard O.

    2012-01-01

    Beginning in 2006, NASA initiated the J-2X engine development effort to develop an upper stage propulsion system to enable the achievement of the primary objectives of the Constellation program (CxP): provide continued access to the International Space Station following the retirement of the Space Station and return humans to the moon. The J-2X system requirements identified to accomplish this were very challenging and the time expended over the five years following the beginning of the J- 2X effort have been noteworthy in the development of innovations in both the fields for liquid rocket propulsion and system engineering.

  18. ERLN Technical Support for Labs

    EPA Pesticide Factsheets

    The Environmental Response Laboratory Network provides policies and guidance on lab and data requirements, Standardized Analytical Methods, and technical support for water and radiological sampling and analysis

  19. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  20. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  1. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  2. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  3. An ethics of body scanners: requirements and future challenges from an ethical point of view

    NASA Astrophysics Data System (ADS)

    Rampp, Benjamin; Wolkenstein, Andreas F. X.; Ammicht Quinn, Regina

    2011-05-01

    At the moment, body scanners based on terahertz and millimeter-wave technologies are implemented at airports around the world. Thus, challenges of acceptance and acceptability become pressing. In this context, we present the results of an ethical research project on the development and implementation of body scanners. We will show which requirements concerning the system, its developers, and its users should be met in order that the scanners can be acceptable from an ethical point of view. These requirements involve, among others, questions of privacy, health, data protection, and security processes. A special ethical challenge for body scanners, however, still remains: Automatic anonymization processes are based on the assumption of "normal" bodies. Certain groups of persons with "deviant bodies" (e.g. persons with hidden disabilities, persons with aberrant sex characteristics, etc.) are affected in a special way: Their deviation from the standard (for instance their disability) is socially hidden, but eventually exposed by body scanners, even (and even more) if the produced pictures are anonymized. Here, we address the question how the possible discrimination against and exclusion of people with "deviant bodies" could be mitigated or prevented.

  4. 32 CFR 202.13 - Technical assistance for public participation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Reporting Requirements § 202.13 Technical assistance for public participation. Community members of a RAB or TRC may request technical assistance for interpreting scientific and engineering issues with regard to...

  5. [Mathematical model of technical equipment of a clinical-diagnostic laboratory].

    PubMed

    Bukin, S I; Busygin, D V; Tilevich, M E

    1990-01-01

    The paper is concerned with the problems of technical equipment of standard clinico-diagnostic laboratories (CDL) in this country. The authors suggest a mathematic model that may minimize expenditures for laboratory studies. The model enables the following problems to be solved: to issue scientifically-based recommendations for technical equipment of CDL; to validate the medico-technical requirements for newly devised items; to select the optimum types of uniform items; to define optimal technical decisions at the stage of the design; to determine the lab assistant's labour productivity and the cost of some investigations; to compute the medical laboratory engineering requirement for treatment and prophylactic institutions of this country.

  6. Assessment of Technical Skills Competence in the Operating Room: A Systematic and Scoping Review.

    PubMed

    Fahim, Christine; Wagner, Natalie; Nousiainen, Markku T; Sonnadara, Ranil

    2018-05-01

    While academic accreditation bodies continue to promote competency-based medical education (CBME), the feasibility of conducting regular CBME assessments remains challenging. The purpose of this study was to identify evidence pertaining to the practical application of assessments that aim to measure technical competence for surgical trainees in a nonsimulated, operative setting. In August 2016, the authors systematically searched Medline, Embase, and the Cochrane Database of Systematic Reviews for English-language, peer-reviewed articles published in or after 1996. The title, abstract, and full text of identified articles were screened. Data regarding study characteristics, psychometric and measurement properties, implementation of assessment, competency definitions, and faculty training were extracted. The findings from the systematic review were supplemented by a scoping review to identify key strategies related to faculty uptake and implementation of CBME assessments. A total of 32 studies were included. The majority of studies reported reasonable scores of interrater reliability and internal consistency. Seven articles identified minimum scores required to establish competence. Twenty-five articles mentioned faculty training. Many of the faculty training interventions focused on timely completion of assessments or scale calibration. There are a number of diverse tools used to assess competence for intraoperative technical skills and a lack of consensus regarding the definition of technical competence within and across surgical specialties. Further work is required to identify when and how often trainees should be assessed and to identify strategies to train faculty to ensure timely and accurate assessment.

  7. An update on technical and methodological aspects for cardiac PET applications.

    PubMed

    Presotto, Luca; Busnardo, Elena; Gianolli, Luigi; Bettinardi, Valentino

    2016-12-01

    Positron emission tomography (PET) is indicated for a large number of cardiac diseases: perfusion and viability studies are commonly used to evaluate coronary artery disease; PET can also be used to assess sarcoidosis and endocarditis, as well as to investigate amyloidosis. Furthermore, a hot topic for research is plaque characterization. Most of these studies are technically very challenging. High count rates and short acquisition times characterize perfusion scans while very small targets have to be imaged in inflammation/infection and plaques examinations. Furthermore, cardiac PET suffers from respiratory and cardiac motion blur. Each type of studies has specific requirements from the technical and methodological point of view, thus PET systems with overall high performances are required. Furthermore, in the era of hybrid PET/computed tomography (CT) and PET/Magnetic Resonance Imaging (MRI) systems, the combination of complementary functional and anatomical information can be used to improve diagnosis and prognosis. Moreover, PET images can be qualitatively and quantitatively improved exploiting information from the other modality, using advanced algorithms. In this review we will report the latest technological and methodological innovations for PET cardiac applications, with particular reference to the state of the art of the hybrid PET/CT and PET/MRI. We will also report the most recent advancements in software, from reconstruction algorithms to image processing and analysis programs.

  8. 48 CFR 719.271-5 - Cognizant technical officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-5 Cognizant technical officers. Since the procurement process starts with the establishment of a requirement, the actions of the cognizant technical officers can affect the opportunity of small business to participate equitably...

  9. Present Challenges, Critical Needs, and Future Technological Directions for NASA's GN and C Engineering Discipline

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) is currently undergoing a substantial redirection. Notable among the changes occurring within NASA is the stated emphasis on technology development, integration, and demonstration. These new changes within the Agency should have a positive impact on the GN&C discipline given the potential for sizeable investments for technology development and in-space demonstrations of both Autonomous Rendezvous & Docking (AR&D) systems and Autonomous Precision Landing (APL) systems. In this paper the NASA Technical Fellow for Guidance, Navigation and Control (GN&C) provides a summary of the present technical challenges, critical needs, and future technological directions for NASA s GN&C engineering discipline. A brief overview of the changes occurring within NASA that are driving a renewed emphasis on technology development will be presented as background. The potential benefits of the planned GN&C technology developments will be highlighted. This paper will provide a GN&C State-of-the-Discipline assessment. The discipline s readiness to support the goals & objectives of each of the four NASA Mission Directorates is evaluated and the technical challenges and barriers currently faced by the discipline are summarized. This paper will also discuss the need for sustained investments to sufficiently mature the several classes of GN&C technologies required to implement NASA crewed exploration and robotic science missions.

  10. Printed batteries and conductive patterns in technical textiles

    NASA Astrophysics Data System (ADS)

    Willert, Andreas; Meuser, Carmen; Baumann, Reinhard R.

    2018-05-01

    Various applications of functional devices need a tailored and reliable supply of electrical energy. Batteries are electrochemical systems that deliver energy for functional devices and applications. Due to the common use, several rigid types of batteries have been standardized. To fully integrate the battery into a product that is bendable, free in geometry and less than 1 mm thick, printing of power adaptable batteries is a challenging area of research. Therefore, the well-known zinc-manganese system, which is very promising due to its environmental sustainability and its simplicity, has been used to manufacture battery solutions on a new kind of substrate: technical textiles. Another challenge is the deposition of conductive patterns. At present, embroidery with metallic yarn is the only possibility to provide conducting paths on technical textiles, a time-consuming and elaborate process. Screen printed conductive pathways will generate a new momentum in the manufacturing of conductivity on textiles.

  11. Security challenges in integration of a PHR-S into a standards based national EHR.

    PubMed

    Mense, Alexander; Hoheiser Pförtner, Franz; Sauermann, Stefan

    2014-01-01

    Health related data provided by patients themselves is expected to play a major role in future healthcare. Data from personal health devices, vaccination records, health diaries or observations of daily living, for instance, is stored in personal health records (PHR) which are maintained by personal health record systems (PHR-S). Combining this information with medical records provided by healthcare providers in electronic health records (EHR) is one of the next steps towards "personal care". Austria currently sets up a nationwide EHR system that incorporates all healthcare providers and is technically based on international standards (IHE, HL7, OASIS, ...). Looking at the expected potential of merging PHR and EHR data it is worth to analyse integration approaches. Although knowing that an integration requires the coordination of processes, information models and technical architectures, this paper specifically focuses on security issues by evaluating general security requirements for a PHR-S (based on HL7 PHR-S FM), comparing them with the information security specifications for the Austrian's national EHR (based on ISO/IES 27000 series) and identifying the main challenges as well as possible approaches.

  12. Engineering directorate technical facilities catalog

    NASA Technical Reports Server (NTRS)

    Maloy, Joseph E.

    1993-01-01

    The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).

  13. Verification Challenges at Low Numbers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benz, Jacob M.; Booker, Paul M.; McDonald, Benjamin S.

    2013-07-16

    This paper will explore the difficulties of deep reductions by examining the technical verification challenges. At each step on the road to low numbers, the verification required to ensure compliance of all parties will increase significantly. Looking post New START, the next step will likely include warhead limits in the neighborhood of 1000 (Pifer 2010). Further reductions will include stepping stones at 100’s of warheads, and then 10’s of warheads before final elimination could be considered of the last few remaining warheads and weapons. This paper will focus on these three threshold reduction levels, 1000, 100’s, 10’s. For each, themore » issues and challenges will be discussed, potential solutions will be identified, and the verification technologies and chain of custody measures that address these solutions will be surveyed. It is important to note that many of the issues that need to be addressed have no current solution. In these cases, the paper will explore new or novel technologies that could be applied. These technologies will draw from the research and development that is ongoing throughout the national lab complex, and will look at technologies utilized in other areas of industry for their application to arms control verification.« less

  14. Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.; Humphries, W. R.

    2001-01-01

    Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.

  15. Hot-melt co-extrusion: requirements, challenges and opportunities for pharmaceutical applications.

    PubMed

    Vynckier, An-Katrien; Dierickx, Lien; Voorspoels, Jody; Gonnissen, Yves; Remon, Jean Paul; Vervaet, Chris

    2014-02-01

    Co-extrusion implies the simultaneous hot-melt extrusion of two or more materials through the same die, creating a multi-layered extrudate. It is an innovative continuous production technology that offers numerous advantages over traditional pharmaceutical processing techniques. This review provides an overview of the co-extrusion equipment, material requirements and medical and pharmaceutical applications. The co-extrusion equipment needed for pharmaceutical production has been summarized. Because the geometrical design of the die dictates the shape of the final product, different die types have been discussed. As one of the major challenges at the moment is shaping the final product in a continuous way, an overview of downstream solutions for processing co-extrudates into drug products is provided. Layer adhesion, extrusion temperature and viscosity matching are pointed out as most important requirements for material selection. Examples of medical and pharmaceutical applications are presented and some recent findings considering the production of oral drug delivery systems have been summarized. Co-extrusion provides great potential for the continuous production of fixed-dose combination products which are gaining importance in pharmaceutical industry. There are still some barriers to the implementation of co-extrusion in the pharmaceutical industry. The optimization of downstream processing remains a point of attention. © 2013 Royal Pharmaceutical Society.

  16. 42 CFR 493.1838 - Training and technical assistance for unsuccessful participation in proficiency testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Training and technical assistance for unsuccessful... REQUIREMENTS Enforcement Procedures § 493.1838 Training and technical assistance for unsuccessful participation... may require the laboratory to undertake training of its personnel, or to obtain necessary technical...

  17. Overcoming Resistance to New Ideas

    ERIC Educational Resources Information Center

    Powell, William; Kusuma-Powell, Ochan

    2015-01-01

    There are two types of challenges that adults face in their professional learning: technical and adaptive. Technical challenges simply require informational learning while adaptive challenges require transformational learning, which requires us to rethink our deeply held values, beliefs, assumptions, and even our professional identity. Adaptive…

  18. Ceramic Integration Technologies for Aerospace and Energy Systems: Technical Challenges and Opportunities

    NASA Technical Reports Server (NTRS)

    Singh, Mrityunjay

    2007-01-01

    Ceramic integration technology has been recognized as an enabling technology for the implementation of advanced ceramic systems in a number of high-temperature applications in aerospace, power generation, nuclear, chemical, and electronic industries. Various ceramic integration technologies (joining, brazing, attachments, repair, etc.) play a role in fabrication and manufacturing of large and complex shaped parts of various functionalities. However, the development of robust and reliable integrated systems with optimum performance requires the understanding of many thermochemical and thermomechanical factors, particularly for high temperature applications. In this presentation, various challenges and opportunities in design, fabrication, and testing of integrated similar (ceramic-ceramic) and dissimilar (ceramic-metal) material systems will be discussed. Experimental results for bonding and integration of SiC based LDI fuel injector, high conductivity C/C composite based heat rejection system, solid oxide fuel cells system, ultra high temperature ceramics for leading edges, and ceramic composites for thermostructural applications will be presented. Potential opportunities and need for the development of innovative design philosophies, approaches, and integrated system testing under simulated application conditions will also be discussed.

  19. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  20. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  1. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  2. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  3. 30 CFR 7.304 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (coarse, loose fitting) threads. The covers shall be secured against loosening. (5) Flat surfaces between... flame-arresting path shall be finished during the manufacturing process to not more than 250 microinches... requirements as the pole piece. (12) Coil-thread inserts, if used in holes for fastenings, shall meet the...

  4. 30 CFR 7.64 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... produce the required firing current is attained. (d) Firing switch. The switch used to initiate the... current is available to the blasting circuit. (e) Firing line terminals. The terminals used to connect the blasting circuit to the blasting unit shall— (1) Provide a secure, low-resistance connection to the...

  5. 30 CFR 7.64 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... produce the required firing current is attained. (d) Firing switch. The switch used to initiate the... current is available to the blasting circuit. (e) Firing line terminals. The terminals used to connect the blasting circuit to the blasting unit shall— (1) Provide a secure, low-resistance connection to the...

  6. Tunnel Vision Prismatic Field Expansion: Challenges and Requirements.

    PubMed

    Apfelbaum, Henry; Peli, Eli

    2015-12-01

    No prismatic solution for peripheral field loss (PFL) has gained widespread acceptance. Field extended by prisms has a corresponding optical scotoma at the prism apices. True expansion can be achieved when each eye is given a different view (through visual confusion). We analyze the effects of apical scotomas and binocular visual confusion in different designs to identify constraints on any solution that is likely to meet acceptance. Calculated perimetry diagrams were compared to perimetry with PFL patients wearing InWave channel prisms and Trifield spectacles. Percept diagrams illustrate the binocular visual confusion. Channel prisms provide no benefit at primary gaze. Inconsequential extension was provided by InWave prisms, although accessible with moderate gaze shifts. Higher-power prisms provide greater extension, with greater paracentral scotoma loss, but require uncomfortable gaze shifts. Head turns, not eye scans, are needed to see regions lost to the apical scotomas. Trifield prisms provide field expansion at all gaze positions, but acceptance was limited by disturbing effects of central binocular visual confusion. Field expansion when at primary gaze (where most time is spent) is needed while still providing unobstructed central vision. Paracentral multiplexing prisms we are developing that superimpose shifted and see-through views may accomplish that. Use of the analyses and diagramming techniques presented here will be of value when considering prismatic aids for PFL, and could have prevented many unsuccessful designs and the improbable reports we cited from the literature. New designs must likely address the challenges identified here.

  7. Challenges to clinical deployment of upper limb neuroprostheses.

    PubMed

    Triolo, R; Nathan, R; Handa, Y; Keith, M; Betz, R R; Carroll, S; Kantor, C

    1996-04-01

    The technology for functional neuromuscular stimulation (FNS) as a means of providing upper limb function to people with tetraplegia has been under development by three clinical research groups for almost two decades. This paper presents the current status of the clinical trials of three FNS systems: a noninvasive system built into a cosmetic forearm splint, a 30-channel percutaneous system, and an 8-channel implantable system. The complexity of FNS systems and the unique characteristics of the individuals to whom they are applied combine to create many clinical and technical challenges that must be addressed before the devices can be deployed. The emerging challenges to widespread clinical introduction of FNS systems for hand and arm function are identified and analyzed. In addition to the demands of designed and conducting the clinical trials to satisfy regulatory requirements, the lack of knowledge, skepticism, and the complacency on the part of potential FNS recipients, as well as of rehabilitation professionals, must be overcome through education and careful consideration of economic and societal factors in the design of clinical systems.

  8. Using smart materials to solve new challenges in the automotive industry

    NASA Astrophysics Data System (ADS)

    Gath, Kerrie K.; Maranville, Clay; Tardiff, Janice

    2018-03-01

    Ford has an extensive history of developing and utilizing smart and innovative materials in its vehicles. In this paper, we present new challenges the automotive industry is facing and explore how intelligent uses of smart materials can help provide solutions. We explore which vehicle attributes may provide most advantageous for the use smart materials, and discuss how smart material have had technical challenges that limit their use. We also look at how smart materials such as gecko inspired adhesion is providing opportunities during the vehicle assembly process by improving manufacturing quality, environmental sustainability, and worker safety. An emerging area for deployment of smart materials may involve autonomous vehicles and mobility solutions, where customer expectations are migrating toward a seamless and adaptive experience leading to new expectations for an enhanced journey. Another area where smart materials are influencing change is interior and exterior design including smart textiles, photochromatic dyes, and thermochromatic materials. The key to advancing smart materials in automotive industry is to capitalize on the smaller niche applications where there will be an advantage over traditional methods. Ford has an extensive history of developing and utilizing smart and innovative materials. Magnetorheological fluids, thermoelectric materials, piezoelectric actuators, and shape memory alloys are all in production. In this paper we present new challenges the automotive industry is facing and explore how intelligent uses of smart materials can help provide solutions. We explore which vehicle attributes may provide most advantageous for the use smart materials, and discuss how smart materials have had technical challenges that limit their use. An emerging area for deployment of smart materials may involve autonomous vehicles and mobility solutions, where customer expectations may require a seamless and adaptive experience for users having various

  9. High resolution weather data for urban hydrological modelling and impact assessment, ICT requirements and future challenges

    NASA Astrophysics Data System (ADS)

    ten Veldhuis, Marie-claire; van Riemsdijk, Birna

    2013-04-01

    presentation will highlight ICT-related requirements and limitations in high resolution urban hydrological modelling and analysis. Further ICT challenges arise in provision of high resolution radar data for diverging information needs as well as in combination with other data sources in the urban environment. Different types of information are required for such diverse activities as operational flood protection, traffic management, large event organisation, business planning in shopping districts and restaurants, timing of family activities. These different information needs may require different configurations and data processing for radars and other data sources. An ICT challenge is to develop techniques for deciding how to automatically respond to these diverging information needs (e.g., through (semi-)automated negotiation). Diverse activities also provide a wide variety of information resources that can supplement traditional networks of weather sensors, such as rain sensors on cars and social media. Another ICT challenge is how to combine data from these different sources for answering a particular information need. Examples will be presented of solutions are currently being explored.

  10. Performance/Design Requirements and Detailed Technical Description for a Computer-Directed Training Subsystem for Integration into the Air Force Phase II Base Level System.

    ERIC Educational Resources Information Center

    Butler, A. K.; And Others

    The performance/design requirements and a detailed technical description for a Computer-Directed Training Subsystem to be integrated into the Air Force Phase II Base Level System are described. The subsystem may be used for computer-assisted lesson construction and has presentation capability for on-the-job training for data automation, staff, and…

  11. Planning for planetary protection : challenges beyond Mars

    NASA Technical Reports Server (NTRS)

    Belz, Andrea P.; Cutts, James A.

    2006-01-01

    This document summarizes the technical challenges to planetary protection for these targets of interest and outlines some of the considerations, particularly at the system level, in designing an appropriate technology investment strategy for targets beyond Mars.

  12. The Challenges of Sensing and Repairing Software Defects in Autonomous Systems

    DTIC Science & Technology

    2014-05-09

    From - To) 28 Nov 2012 – 24 Feb 2014 4 . TITLE AND SUBTITLE The Challenges of Sensing and Repairing Software Defects in Autonomous Systems 5a...fault localization to focus edit locations; (3) existing code to provide the seed of new repairs; ( 4 ) fitness approximation to reduce required test...Assumptions, and Procedures…………………………………………………...….1 4 . Results and Discussion………………………………………………………………………..3 4.1 Technical Approach

  13. Status, Vision, and Challenges of an Intelligent Distributed Engine Control Architecture

    NASA Technical Reports Server (NTRS)

    Behbahani, Alireza; Culley, Dennis; Garg, Sanjay; Millar, Richard; Smith, Bert; Wood, Jim; Mahoney, Tim; Quinn, Ronald; Carpenter, Sheldon; Mailander, Bill; hide

    2007-01-01

    A Distributed Engine Control Working Group (DECWG) consisting of the Department of Defense (DoD), the National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) and industry has been formed to examine the current and future requirements of propulsion engine systems. The scope of this study will include an assessment of the paradigm shift from centralized engine control architecture to an architecture based on distributed control utilizing open system standards. Included will be a description of the work begun in the 1990's, which continues today, followed by the identification of the remaining technical challenges which present barriers to on-engine distributed control.

  14. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reporting of technical data. 777.13 Section 777.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  15. 47 CFR 74.861 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prescribed in paragraphs (c) through (e) of this section. (c) Low power auxiliary transmitters not required... bands—50 mW (ii) 470-608 and 614-698 MHz bands—250 mW (2) Transmitters may be either crystal controlled... eliminate the interference. (Sec. 5, 48 Stat. 1068; 47 U.S.C. 155) [43 FR 13576, Mar. 31, 1978, as amended...

  16. Missing data and technical variability in single-cell RNA-sequencing experiments.

    PubMed

    Hicks, Stephanie C; Townes, F William; Teng, Mingxiang; Irizarry, Rafael A

    2017-11-06

    Until recently, high-throughput gene expression technology, such as RNA-Sequencing (RNA-seq) required hundreds of thousands of cells to produce reliable measurements. Recent technical advances permit genome-wide gene expression measurement at the single-cell level. Single-cell RNA-Seq (scRNA-seq) is the most widely used and numerous publications are based on data produced with this technology. However, RNA-seq and scRNA-seq data are markedly different. In particular, unlike RNA-seq, the majority of reported expression levels in scRNA-seq are zeros, which could be either biologically-driven, genes not expressing RNA at the time of measurement, or technically-driven, genes expressing RNA, but not at a sufficient level to be detected by sequencing technology. Another difference is that the proportion of genes reporting the expression level to be zero varies substantially across single cells compared to RNA-seq samples. However, it remains unclear to what extent this cell-to-cell variation is being driven by technical rather than biological variation. Furthermore, while systematic errors, including batch effects, have been widely reported as a major challenge in high-throughput technologies, these issues have received minimal attention in published studies based on scRNA-seq technology. Here, we use an assessment experiment to examine data from published studies and demonstrate that systematic errors can explain a substantial percentage of observed cell-to-cell expression variability. Specifically, we present evidence that some of these reported zeros are driven by technical variation by demonstrating that scRNA-seq produces more zeros than expected and that this bias is greater for lower expressed genes. In addition, this missing data problem is exacerbated by the fact that this technical variation varies cell-to-cell. Then, we show how this technical cell-to-cell variability can be confused with novel biological results. Finally, we demonstrate and discuss how batch

  17. Soft Skills: The New Curriculum for Hard-Core Technical Professionals

    ERIC Educational Resources Information Center

    Bancino, Randy; Zevalkink, Claire

    2007-01-01

    In this article, the authors talk about the importance of soft skills for hard-core technical professionals. In many technical professions, the complete focus of education and training is on technical topics either directly or indirectly related to a career or discipline. Students are generally required to master various mathematics skills,…

  18. Engineering Challenges for Floating Offshore Wind Turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butterfield, S.; Musial, W.; Jonkman, J.

    The major objective of this paper is to survey the technical challenges that must be overcome to develop deepwater offshore wind energy technologies and to provide a framework from which the first-order economics can be assessed.

  19. Robust Joining and Assembly Technologies for Ceramic Matrix Composites: Technical Challenges and Opportunities

    NASA Technical Reports Server (NTRS)

    Mrityunjay, Singh; Gray, Hugh R. (Technical Monitor)

    2002-01-01

    Fiber reinforced ceramic matrix composites are under active consideration for use in a wide variety of high temperature applications within the aeronautics, energy, process, and nuclear industries. The engineering designs require fabrication and manufacturing of complex shaped parts. In many instances, it is more economical to build up complex shapes by Joining simple geometrical shapes. Thus, joining and attachment have been recognized as enabling technologies for successful utilization of ceramic components in various demanding applications. In this presentation, various challenges and opportunities in design, fabrication, and testing of high temperature joints in ceramic matrix composites will be presented. Various joint design philosophies and design issues in joining of composites will be discussed along with an affordable, robust ceramic joining technology (ARCJoinT). A wide variety of ceramic composites, in different shapes and sizes, have been joined using this technology. Microstructure and mechanical properties of joints will be reported. Current status of various ceramic joining technologies and future prospects for their applications will also be discussed.

  20. Ceramic Integration Technologies for Advanced Energy Systems: Critical Needs, Technical Challenges, and Opportunities

    NASA Technical Reports Server (NTRS)

    Singh, Mrityunjay

    2010-01-01

    Advanced ceramic integration technologies dramatically impact the energy landscape due to wide scale application of ceramics in all aspects of alternative energy production, storage, distribution, conservation, and efficiency. Examples include fuel cells, thermoelectrics, photovoltaics, gas turbine propulsion systems, distribution and transmission systems based on superconductors, nuclear power generation and waste disposal. Ceramic integration technologies play a key role in fabrication and manufacturing of large and complex shaped parts with multifunctional properties. However, the development of robust and reliable integrated systems with optimum performance requires the understanding of many thermochemical and thermomechanical factors, particularly for high temperature applications. In this presentation, various needs, challenges, and opportunities in design, fabrication, and testing of integrated similar (ceramic ceramic) and dissimilar (ceramic metal) material www.nasa.gov 45 ceramic-ceramic-systems have been discussed. Experimental results for bonding and integration of SiC based Micro-Electro-Mechanical-Systems (MEMS) LDI fuel injector and advanced ceramics and composites for gas turbine applications are presented.