Sample records for technical control room

  1. 33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  2. Document handover of ISS Flight Control room to new Flight Control Room in old MCC

    NASA Image and Video Library

    2006-10-06

    JSC2006-E-43863 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. This view is toward the rear of the "new" room. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.

  3. Document handover of ISS Flight Control room to new Flight Control Room in old MCC

    NASA Image and Video Library

    2006-10-06

    JSC2006-E-43860 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.

  4. 76 FR 50276 - STP Nuclear Operating Company, South Texas Project, Units 1 and 2; Notice of Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... revised the application of Risk- Managed Technical Specifications to Technical Specification 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' The purpose of the change was to correct a misapplication of the Configuration Risk Management Program that is currently allowed by the Technical...

  5. NFL Films audio, video, and film production facilities

    NASA Astrophysics Data System (ADS)

    Berger, Russ; Schrag, Richard C.; Ridings, Jason J.

    2003-04-01

    The new NFL Films 200,000 sq. ft. headquarters is home for the critically acclaimed film production that preserves the NFL's visual legacy week-to-week during the football season, and is also the technical plant that processes and archives football footage from the earliest recorded media to the current network broadcasts. No other company in the country shoots more film than NFL Films, and the inclusion of cutting-edge video and audio formats demands that their technical spaces continually integrate the latest in the ever-changing world of technology. This facility houses a staggering array of acoustically sensitive spaces where music and sound are equal partners with the visual medium. Over 90,000 sq. ft. of sound critical technical space is comprised of an array of sound stages, music scoring stages, audio control rooms, music writing rooms, recording studios, mixing theaters, video production control rooms, editing suites, and a screening theater. Every production control space in the building is designed to monitor and produce multi channel surround sound audio. An overview of the architectural and acoustical design challenges encountered for each sophisticated listening, recording, viewing, editing, and sound critical environment will be discussed.

  6. Integrated intelligent systems in advanced reactor control rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beckmeyer, R.R.

    1989-01-01

    An intelligent, reactor control room, information system is designed to be an integral part of an advanced control room and will assist the reactor operator's decision making process by continuously monitoring the current plant state and providing recommended operator actions to improve that state. This intelligent system is an integral part of, as well as an extension to, the plant protection and control systems. This paper describes the interaction of several functional components (intelligent information data display, technical specifications monitoring, and dynamic procedures) of the overall system and the artificial intelligence laboratory environment assembled for testing the prototype. 10 refs.,more » 5 figs.« less

  7. Control centers design for ergonomics and safety.

    PubMed

    Quintana, Leonardo; Lizarazo, Cesar; Bernal, Oscar; Cordoba, Jorge; Arias, Claudia; Monroy, Magda; Cotrino, Carlos; Montoya, Olga

    2012-01-01

    This paper shows the general design conditions about ergonomics and safety for control centers in the petrochemical process industry. Some of the topics include guidelines for the optimized workstation design, control room layout, building layout, and lighting, acoustical and environmental design. Also takes into account the safety parameters in the control rooms and centers design. The conditions and parameters shown in this paper come from the standards and global advances on this topic on the most recent publications. And also the work was supplemented by field visits of our team to the control center operations in a petrochemical company, and technical literature search efforts. This guideline will be useful to increase the productivity and improve the working conditions at the control rooms.

  8. Coaching Non-technical Skills Improves Surgical Residents' Performance in a Simulated Operating Room.

    PubMed

    Yule, Steven; Parker, Sarah Henrickson; Wilkinson, Jill; McKinley, Aileen; MacDonald, Jamie; Neill, Adrian; McAdam, Tim

    2015-01-01

    To investigate the effect of coaching on non-technical skills and performance during laparoscopic cholecystectomy in a simulated operating room (OR). Non-technical skills (situation awareness, decision making, teamwork, and leadership) underpin technical ability and are critical to the success of operations and the safety of patients in the OR. The rate of developing assessment tools in this area has outpaced development of workable interventions to improve non-technical skills in surgical training and beyond. A randomized trial was conducted with senior surgical residents (n = 16). Participants were randomized to receive either non-technical skills coaching (intervention) or to self-reflect (control) after each of 5 simulated operations. Coaching was based on the Non-Technical Skills For Surgeons (NOTSS) behavior observation system. Surgeon-coaches trained in this method coached participants in the intervention group for 10 minutes after each simulation. Primary outcome measure was non-technical skills, assessed from video by a surgeon using the NOTSS system. Secondary outcomes were time to call for help during bleeding, operative time, and path length of laparoscopic instruments. Non-technical skills improved in the intervention group from scenario 1 to scenario 5 compared with those in the control group (p = 0.04). The intervention group was faster to call for help when faced with unstoppable bleeding in the final scenario (no. 5; p = 0.03). Coaching improved residents' non-technical skills in the simulated OR compared with those in the control group. Important next steps are to implement non-technical skills coaching in the real OR and assess effect on clinically important process measures and patient outcomes. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  9. Human Factors Analysis of Pipeline Monitoring and Control Operations: Final Technical Report

    DOT National Transportation Integrated Search

    2008-11-26

    The purpose of the Human Factors Analysis of Pipeline Monitoring and Control Operations project was to develop procedures that could be used by liquid pipeline operators to assess and manage the human factors risks in their control rooms that may adv...

  10. 35. SITE BUILDING 004 ELECTRIC POWER STATION CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. SITE BUILDING 004 - ELECTRIC POWER STATION - CONTROL ROOM OF ELECTRIC POWER STATION WITH DIESEL ENGINE POWERED ELECTRIC GENERATION EQUIPMENT IN BACKGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  11. Individualized deliberate practice on a virtual reality simulator improves technical performance of surgical novices in the operating room: a randomized controlled trial.

    PubMed

    Palter, Vanessa N; Grantcharov, Teodor P

    2014-03-01

    The purpose of this study was to investigate whether individualized deliberate practice on a virtual reality (VR) simulator results in improved technical performance in the operating room. Training on VR simulators has been shown to improve technical performance in the operating room (OR). Currently described VR curricula consist of trainees practicing the same tasks until expert proficiency is reached. It has yet to be investigated whether the individualized deliberate practice, where curricula tasks vary depending on prior levels of technical proficiency, would translate into the OR. This single-blinded prospective trial randomized 16 novice surgical residents to a deliberate practice (DP) group and a conventional residency training group. Both groups performed a laparoscopic cholecystectomy in the OR that was video-recorded. Technical performance of DP group residents in the OR was assessed using 3 validated assessment tools. A score of less than 60% on any component of the assessment tool resulted in the trainee practicing a specific task on the VR simulator. The DP group practiced on the simulator as per their individualized schedule. Both groups then performed another laparoscopic cholecystectomy. A blinded expert assessed the OR recordings using a validated global rating scale. Although both groups had similar technical abilities preintervention [DP: median score, 13.5 (9.3-15.0); control: median score, 14.5 (9.3-17.8); P = 0.45], the DP residents had a superior technical performance postintervention [DP: median score, 17.0 (15.3-18.5); control: median score, 12.5 (7.5-14.0); P = 0.03]. Of 8 DP residents, 6 practiced 5 basic VR tasks (median 1 trial to pass), and 7 of 8 practiced 2 advanced tasks (median 4 trials to pass). A curriculum of deliberate individualized practice on a VR simulator improves technical performance in the OR. This has implications to greatly improve the feasibility of implementing simulation-based curricula in residency training programs, rather then having them being limited to research protocols.

  12. NFL Films music scoring stage and control room space

    NASA Astrophysics Data System (ADS)

    Berger, Russ; Schrag, Richard C.; Ridings, Jason J.

    2003-04-01

    NFL Films' new 200,000 sq. ft. corporate headquarters is home to an orchestral scoring stage used to record custom music scores to support and enhance their video productions. Part of the 90,000 sq. ft. of sound critical technical space, the music scoring stage and its associated control room are at the heart of the audio facilities. Driving the design were the owner's mandate for natural light, wood textures, and an acoustical environment that would support small rhythm sections, soloists, and a full orchestra. Being an industry leader in cutting-edge video and audio formats, the NFLF required that the technical spaces allow the latest in technology to be continually integrated into the infrastructure. Never was it more important for a project to hold true to the adage of ``designing from the inside out.'' Each audio and video space within the facility had to stand on its own with regard to user functionality, acoustical accuracy, sound isolation, noise control, and monitor presentation. A detailed look at the architectural and acoustical design challenges encountered and the solutions developed for the performance studio and the associated control room space will be discussed.

  13. Digital Full-Scope Simulation of a Conventional Nuclear Power Plant Control Room, Phase 2: Installation of a Reconfigurable Simulator to Support Nuclear Plant Sustainability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L. Boring; Vivek Agarwal; Kirk Fitzgerald

    2013-03-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator ismore » also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.« less

  14. Proteus DSA control room in Mojave, CA

    NASA Image and Video Library

    2003-04-03

    Proteus DSA control room in Mojave, CA (L to R) Jean-Pierre Soucy; Amphitech International Software engineer Craig Bomben; NASA Dryden Test Pilot Pete Siebold; (with headset, at computer controls) Scaled Composites pilot Bob Roehm; New Mexico State University (NMSU) UAV Technical Analysis Application Center (TAAC) Chuck Coleman; Scaled Composites Pilot Kari Sortland; NMSU TAAC Russell Wolfe; Modern Technology Solutions, Inc. Scaled Composites' unique tandem-wing Proteus was the testbed for a series of UAV collision-avoidance flight demonstrations. An Amphitech 35GHz radar unit installed below Proteus' nose was the primary sensor for the Detect, See and Avoid tests.

  15. Comprehensive Surgical Coaching Enhances Surgical Skill in the Operating Room: A Randomized Controlled Trial.

    PubMed

    Bonrath, Esther M; Dedy, Nicolas J; Gordon, Lauren E; Grantcharov, Teodor P

    2015-08-01

    The aim of the study was to determine whether individualized coaching improved surgical technical skill in the operating room to a higher degree than current residency training. Clinical training in the operating room is a valuable opportunity for surgeons to acquire skill and knowledge; however, it often remains underutilized. Coaching has been successfully used in various industries to enhance performance, but its role in surgery has been insufficiently investigated. This randomized controlled trial was conducted at one surgical training program. Trainees undergoing a minimally invasive surgery rotation were randomized to either conventional training (CT) or comprehensive surgical coaching (CSC). CT included ward and operating room duties, and regular departmental teaching sessions. CSC comprised performance analysis, debriefing, feedback, and behavior modeling. Primary outcome measures were technical performance as measured on global and procedure-specific rating scales, and surgical safety parameters, measured by error count. Operative performance was assessed by blinded video analysis of the first and last cases recorded by the participants during their rotation. Twenty residents were randomized and 18 completed the study. At posttraining the CSC group (n = 9) scored significantly higher on a procedure-specific skill scale compared with the CT group (n = 9) [median, 3.90 (interquartile range, 3.68-4.30) vs 3.60 (2.98-3.70), P = 0.017], and made fewer technical errors [10 (7-13) vs 18 (13-21), P = 0.003]. Significant within-group improvements for all skill metrics were only noted in the CSC group. Comprehensive surgical coaching enhances surgical training and results in skill acquisition superior to conventional training.

  16. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... on the remote afterloader unit, on the control console, and in the facility; (3) Viewing and intercom... monitors used to indicate room exposures; (6) Source positioning (accuracy); and (7) Radiation monitors...

  17. 75 FR 14482 - Fifty-First Meeting: RTCA Special Committee 186: Automatic Dependent Surveillance-Broadcast (ADS-B)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ..., WG-1, Wake Vortex, ARINC Room. RTCA--All Day, WG-4, Application Technical Requirements, Colson Board... Vortex, MacIntosh-NBAA Room & Hilton-ATA Room. RTCA--All Day, WG-4, Application Technical Requirements...

  18. Edwin I. Hatch nuclear plant implementation of improved technical specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahler, S.R.; Pendry, D.

    1994-12-31

    Edwin I. Hatch nuclear plant consists of two General Electric boiling water reactor/4 units, with a common control room and a common refueling floor. In March 1993, Hatch began conversion of both units` technical specifications utilizing NUREG 1433. The technical specifications amendment request was submitted February 25, 1994. Issuance is scheduled for October 21, 1994, with implementation on March 15, 1994. The current unit-1 technical specifications are in the {open_quotes}custom{close_quotes} format, and the unit-2 technical specifications are in the old standard format. Hatch previously relocated the fire protection and radiological technical specifications requirements. The Hatch conversion will provide consistency betweenmore » the two units, to the extent practicable.« less

  19. A HUMAN FACTORS META MODEL FOR U.S. NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joe, Jeffrey C.

    Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R&D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R&D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model formore » U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high level roadmap and guidance on how to perform human factors R&D and HFE for those in the U.S. nuclear industry that are engaging in the process of upgrading their MCRs.« less

  20. Fluorescent and high intensity discharge lamp use in chambers and greenhouses

    NASA Technical Reports Server (NTRS)

    Langhans, Robert W.

    1994-01-01

    Fluorescent and High Intensity Discharge lamps have opened up great opportunities for researchers to study plant growth under controlled environment conditions and for commercial growers to increase plant production during low/light periods. Specific technical qualities of fluorescent and HID lamps have been critically reviewed. I will direct my remarks to fluorescent and high intensity discharge (HID) lamps in growth chambers, growth rooms, and greenhouses. I will discuss the advantages and disadvantages of using each lamp in growth chambers, growth rooms and greenhouses.

  1. Report for Task 8.4: Development of Control Room Layout Recommendations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, Robert

    Idaho National Laboratory (INL) has contracted Institutt for Energiteknikk (IFE) to support in the development of an end state vision for the US Nuclear industry and in particular for a utility that is currently moving forward with a control room modernization project. This support includes the development of an Overview display and technical support in conducting an operational study. Development of operational scenarios to be conducted using a full scope simulator at the INL HSSL. Additionally IFE will use the CREATE modelling tool to provide 3-D views of the potential and possible end state view after the completion of digitalmore » upgrade project.« less

  2. An image, looking east into Room 112A, filled with technical ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    An image, looking east into Room 112A, filled with technical equipment pertinent to the building's recent use - Department of Energy, Mound Facility, Electronics Laboratory Building (E Building), One Mound Road, Miamisburg, Montgomery County, OH

  3. Internal Controls for the Military Sealift Command Portion of the Transportation Business Area of the FY 1994 Defense Business Operations Fund Financial Statements

    DTIC Science & Technology

    1995-06-28

    Secondary Reports Dilution Unit, Audit Planning and Technical Support Directorate, at (703) 604-8937 (DSN 664-8937) or FAX (703) 604-8932. Suggestions...for Future Audits To suggest ideas for or to request future audits , contact the Planning and Coordination Branch, Audit Planning and Technical...Defense OAIG-AUD (ATTN: APTS Audit Suggestions) 400 Army Navy Drive (Room 801) Arlington, Virginia 22202-2884 DoD Hotline To report fraud, waste

  4. Quantum Manybody Physics with Rydberg Polaritons

    DTIC Science & Technology

    2016-06-22

    report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...for public release. Over the course of this grant, we have seen tremendous progress, both theoretically and experimentally , in our control of photonic...shown in multiple stages of construction at left and below, spans three optical tables in two rooms: One for the experimental control system

  5. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  6. Human Factors Engineering Aspects of Modifications in Control Room Modernization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hugo, Jacques; Clefton, Gordon; Joe, Jeffrey

    This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by variousmore » resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.« less

  7. Development of magnetostrictive active members for control of space structures

    NASA Technical Reports Server (NTRS)

    Johnson, Bruce G.; Avakian, Kevin M.; Fenn, Ralph C.; Gaffney, Monique S.; Gerver, Michael J.; Hawkey, Timothy J.; Boudreau, Donald J.

    1992-01-01

    The goal of this Phase 2 Small Business Innovative Research (SBIR) project was to determine the technical feasibility of developing magnetostrictive active members for use as truss elements in space structures. Active members control elastic vibrations of truss-based space structures and integrate the functions of truss structure element, actively controlled actuator, and sensor. The active members must control structural motion to the sub-micron level and, for many proposed space applications, work at cryogenic temperatures. Under this program both room temperature and cryogenic temperature magnetostrictive active members were designed, fabricated, and tested. The results of these performance tests indicated that room temperature magnetostrictive actuators feature higher strain, stiffness, and force capability with lower amplifier requirements than similarly sized piezoelectric or electrostrictive active members, at the cost of higher mass. Two different cryogenic temperature magnetostrictive materials were tested at liquid nitrogen temperatures, both with larger strain capability than the room temperature magnetostrictive materials. The cryogenic active member development included the design and fabrication of a cryostat that allows operation of the cryogenic active member in a space structure testbed.

  8. Development of magnetostrictive active members for control of space structures

    NASA Astrophysics Data System (ADS)

    Johnson, Bruce G.; Avakian, Kevin M.; Fenn, Ralph C.; Gaffney, Monique S.; Gerver, Michael J.; Hawkey, Timothy J.; Boudreau, Donald J.

    1992-08-01

    The goal of this Phase 2 Small Business Innovative Research (SBIR) project was to determine the technical feasibility of developing magnetostrictive active members for use as truss elements in space structures. Active members control elastic vibrations of truss-based space structures and integrate the functions of truss structure element, actively controlled actuator, and sensor. The active members must control structural motion to the sub-micron level and, for many proposed space applications, work at cryogenic temperatures. Under this program both room temperature and cryogenic temperature magnetostrictive active members were designed, fabricated, and tested. The results of these performance tests indicated that room temperature magnetostrictive actuators feature higher strain, stiffness, and force capability with lower amplifier requirements than similarly sized piezoelectric or electrostrictive active members, at the cost of higher mass. Two different cryogenic temperature magnetostrictive materials were tested at liquid nitrogen temperatures, both with larger strain capability than the room temperature magnetostrictive materials. The cryogenic active member development included the design and fabrication of a cryostat that allows operation of the cryogenic active member in a space structure testbed.

  9. 76 FR 64399 - Advisory Committee on Reactor Safeguards; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... Thursday, October 21, 2010 (74 FR 65038-65039). Thursday, November 3, 2011, Conference Room T2-B1, 11545... Evaluation of Diversity and Defense-In-Depth in Digital Computer-Based Instrumentation and Control Systems... staff regarding Branch Technical Position 7- 19, ``Guidance for the Evaluation of Diversity and Defense...

  10. Human System Simulation in Support of Human Performance Technical Basis at NPPs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Gertman; Katya Le Blanc; alan mecham

    2010-06-01

    This paper focuses on strategies and progress toward establishing the Idaho National Laboratory’s (INL’s) Human Systems Simulator Laboratory at the Center for Advanced Energy Studies (CAES), a consortium of Idaho State Universities. The INL is one of the National Laboratories of the US Department of Energy. One of the first planned applications for the Human Systems Simulator Laboratory is implementation of a dynamic nuclear power plant simulation (NPP) where studies of operator workload, situation awareness, performance and preference will be carried out in simulated control rooms including nuclear power plant control rooms. Simulation offers a means by which to reviewmore » operational concepts, improve design practices and provide a technical basis for licensing decisions. In preparation for the next generation power plant and current government and industry efforts in support of light water reactor sustainability, human operators will be attached to a suite of physiological measurement instruments and, in combination with traditional Human Factors Measurement techniques, carry out control room tasks in simulated advanced digital and hybrid analog/digital control rooms. The current focus of the Human Systems Simulator Laboratory is building core competence in quantitative and qualitative measurements of situation awareness and workload. Of particular interest is whether introduction of digital systems including automated procedures has the potential to reduce workload and enhance safety while improving situation awareness or whether workload is merely shifted and situation awareness is modified in yet to be determined ways. Data analysis is carried out by engineers and scientists and includes measures of the physical and neurological correlates of human performance. The current approach supports a user-centered design philosophy (see ISO 13407 “Human Centered Design Process for Interactive Systems, 1999) wherein the context for task performance along with the requirements of the end-user are taken into account during the design process and the validity of design is determined through testing of real end users« less

  11. Multimode marine engine room simulation system based on field bus technology

    NASA Astrophysics Data System (ADS)

    Zheng, Huayao; Deng, Linlin; Guo, Yi

    2003-09-01

    Developing multi mode MER (Marine Engine Room) Labs is the main work in Marine Simulation Center, which is the key lab of Communication Ministry of China. It includes FPP (Fixed Pitch Propeller) and CPP (Controllable Pitch Propeller) mode MER simulation systems, integrated electrical propulsion mode MER simulation system, physical mode MER lab, etc. FPP mode simulation system, which was oriented to large container ship, had been completed since 1999, and got second level of Shanghai Municipal Science and Technical Progress award. This paper mainly introduces the recent development and achievements of Marine Simulation Center. Based on the Lon Works field bus, the structure characteristics and control strategies of completely distributed intelligent control network are discussed. The experiment mode of multi-nodes field bus detection and control system is described. Besides, intelligent fault diagnosis technology about some mechatronics integration control systems explored is also involved.

  12. Assessing Nurse Anaesthetists' Non-Technical Skills in the operating room.

    PubMed

    Lyk-Jensen, H T; Jepsen, R M H G; Spanager, L; Dieckmann, P; Østergaard, D

    2014-08-01

    Incident reporting and fieldwork in operating rooms have shown that some of the errors that arise in anaesthesia relate to inadequate use of non-technical skills. To provide a tool for training and feedback on nurse anaesthetists' non-technical skills, this study aimed to adapt the Anaesthetists' Non-Technical Skills (ANTS) as a behavioural marker system for the formative assessment of nurse anaesthetists' non-technical skills in the operating room. A qualitative approach with focus group interviews was used to identify the non-technical skills of nurse anaesthetists in the operating room. The interview data were transcribed verbatim. Directed content analysis was used to code and sort data deductively into the ANTS categories: task management, team working, situation awareness and decision making. The prototype named Nurse Anaesthetists' Non-Technical Skills (N-ANTS) was presented and discussed in a group of subject matter experts to ensure face validity. The N-ANTS system consists of the same four categories as ANTS and 15 underlying elements. Three to five good and poor behavioural markers for each element were identified. The headings and definitions of the categories and elements were adjusted to encompass the behavioural markers in N-ANTS. The differences that emerged mainly reflected statements regarding the establishment of role, competence, and task delegation. A behavioural marker system, N-ANTS, for nurse anaesthetists was adapted from a behavioural marker system, ANTS, for anaesthesiologists. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  13. Using simulation to train orthopaedic trainees in non-technical skills: A pilot study.

    PubMed

    Heaton, Samuel R; Little, Zoe; Akhtar, Kash; Ramachandran, Manoj; Lee, Joshua

    2016-08-18

    To enhance non-technical skills and to analyse participant's experience of a course tailored for orthopaedic surgeons. A Delphi technique was used to develop a course in human factors specific to orthopaedic residents. Twenty-six residents (six per course) participated in total with seven course facilitators all trained in Crisis Resource Management providing structured feedback. Six scenarios recreated challenging real-life situations using high-fidelity mannequins and simulated patients. Environments included a simulated operating suite, clinic room and ward setting. All were undertaken in a purpose built simulation suite utilising actors, mock operating rooms, mock clinical rooms and a high fidelity adult patient simulator organised through a simulation control room. Participants completed a 5-point Likert scale questionnaire (strongly disagree to strongly agree) before and after the course. This assessed their understanding of non-technical skills, scenario validity, relevance to orthopaedic training and predicted impact of the course on future practice. A course evaluation questionnaire was also completed to assess participants' feedback on the value and quality of the course itself. Twenty-six orthopaedic residents participated (24 male, 2 female; post-graduation 5-10 years), mean year of residency program 2.6 out of 6 years required in the United Kingdom. Pre-course questionnaires showed that while the majority of candidates recognised the importance of non-technical (NT) skills in orthopaedic training they demonstrated poor understanding of non-technical skills and their role. This improved significantly after the course (Likert score 3.0-4.2) and the perceived importance of these skills was reported as good or very good in 100%. The course was reported as enjoyable and provided an unthreatening learning environment with the candidates placing particular value on the learning opportunity provided by reflecting on their performance. All agreed that the course achieved its intended aims with realistic simulation scenarios. Participants believed patient care, patient safety and team working would all improve with further human factors training (4.4-4.6). and felt that NT skills learnt through simulation-based training should become an integral component of their training program. Participants demonstrated improved understanding of non-technical performance, recognised its relevance to patient safety and expressed a desire for its integration in training.

  14. Hand sanitizer-dispensing door handles increase hand hygiene compliance: a pilot study.

    PubMed

    Babiarz, Lukasz S; Savoie, Brent; McGuire, Mark; McConnell, Lauren; Nagy, Paul

    2014-04-01

    Improving rates of hand hygiene compliance (HHC) has been shown to reduce nosocomial disease. We compared the HHC for a traditional wall-mounted unit and a novel sanitizer-dispensing door handle device in a hospital inpatient ultrasound area. HHC increased 24.5%-77.1% (P < .001) for the exam room with the sanitizer-dispensing door handle, whereas it remained unchanged for the other rooms. Technical improvements like a sanitizer-dispensing door handle can improve hospital HHC. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  15. Technical and Economic Aspects of Designing an Efficient Room Air-Conditioner Program in India

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abhyankar, Nikit; Shah, Nihar; Phadke, Amol

    Several studies have projected a massive increase in the demand for air conditioners (ACs) over the next two decades in India. By 2030, room ACs could add 140 GW to the peak load, equivalent to over 30% of the total projected peak load. Therefore, there is significant interest among policymakers, regulators, and utilities in managing room AC demand by enhancing energy efficiency. Building on the historical success of the Indian Bureau of Energy Efficiency’s star-labeling program, Energy Efficiency Services Limited recently announced a program to accelerate the sale of efficient room ACs using bulk procurement, similar to their successful UJALAmore » light-emitting diode (LED) bulk procurement program. This report discusses some of the key considerations in designing a bulk procurement or financial incentive program for enhancing room AC efficiency in India. We draw upon our previous research to demonstrate the overall technical potential and price impact of room AC efficiency improvement and its technical feasibility in India. We also discuss the importance of using low global warming potential (GWP) refrigerants and smart AC equipment that is demand response (DR) ready.« less

  16. Technical Note: Millimeter precision in ultrasound based patient positioning: Experimental quantification of inherent technical limitations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballhausen, Hendrik, E-mail: hendrik.ballhausen@med.uni-muenchen.de; Hieber, Sheila; Li, Minglun

    2014-08-15

    Purpose: To identify the relevant technical sources of error of a system based on three-dimensional ultrasound (3D US) for patient positioning in external beam radiotherapy. To quantify these sources of error in a controlled laboratory setting. To estimate the resulting end-to-end geometric precision of the intramodality protocol. Methods: Two identical free-hand 3D US systems at both the planning-CT and the treatment room were calibrated to the laboratory frame of reference. Every step of the calibration chain was repeated multiple times to estimate its contribution to overall systematic and random error. Optimal margins were computed given the identified and quantified systematicmore » and random errors. Results: In descending order of magnitude, the identified and quantified sources of error were: alignment of calibration phantom to laser marks 0.78 mm, alignment of lasers in treatment vs planning room 0.51 mm, calibration and tracking of 3D US probe 0.49 mm, alignment of stereoscopic infrared camera to calibration phantom 0.03 mm. Under ideal laboratory conditions, these errors are expected to limit ultrasound-based positioning to an accuracy of 1.05 mm radially. Conclusions: The investigated 3D ultrasound system achieves an intramodal accuracy of about 1 mm radially in a controlled laboratory setting. The identified systematic and random errors require an optimal clinical tumor volume to planning target volume margin of about 3 mm. These inherent technical limitations do not prevent clinical use, including hypofractionation or stereotactic body radiation therapy.« less

  17. Cognitive Virtualization: Combining Cognitive Models and Virtual Environments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuan Q. Tran; David I. Gertman; Donald D. Dudenhoeffer

    2007-08-01

    3D manikins are often used in visualizations to model human activity in complex settings. Manikins assist in developing understanding of human actions, movements and routines in a variety of different environments representing new conceptual designs. One such environment is a nuclear power plant control room, here they have the potential to be used to simulate more precise ergonomic assessments of human work stations. Next generation control rooms will pose numerous challenges for system designers. The manikin modeling approach by itself, however, may be insufficient for dealing with the desired technical advancements and challenges of next generation automated systems. Uncertainty regardingmore » effective staffing levels; and the potential for negative human performance consequences in the presence of advanced automated systems (e.g., reduced vigilance, poor situation awareness, mistrust or blind faith in automation, higher information load and increased complexity) call for further research. Baseline assessment of novel control room equipment(s) and configurations needs to be conducted. These design uncertainties can be reduced through complementary analysis that merges ergonomic manikin models with models of higher cognitive functions, such as attention, memory, decision-making, and problem-solving. This paper will discuss recent advancements in merging a theoretical-driven cognitive modeling framework within a 3D visualization modeling tool to evaluate of next generation control room human factors and ergonomic assessment. Though this discussion primary focuses on control room design, the application for such a merger between 3D visualization and cognitive modeling can be extended to various areas of focus such as training and scenario planning.« less

  18. [Team training and assessment in mixed reality-based simulated operating room : Current state of research in the field of simulation in spine surgery exemplified by the ATMEOS project].

    PubMed

    Stefan, P; Pfandler, M; Wucherer, P; Habert, S; Fürmetz, J; Weidert, S; Euler, E; Eck, U; Lazarovici, M; Weigl, M; Navab, N

    2018-04-01

    Surgical simulators are being increasingly used as an attractive alternative to clinical training in addition to conventional animal models and human specimens. Typically, surgical simulation technology is designed for the purpose of teaching technical surgical skills (so-called task trainers). Simulator training in surgery is therefore in general limited to the individual training of the surgeon and disregards the participation of the rest of the surgical team. The objective of the project Assessment and Training of Medical Experts based on Objective Standards (ATMEOS) is to develop an immersive simulated operating room environment that enables the training and assessment of multidisciplinary surgical teams under various conditions. Using a mixed reality approach, a synthetic patient model, real surgical instruments and radiation-free virtual X‑ray imaging are combined into a simulation of spinal surgery. In previous research studies, the concept was evaluated in terms of realism, plausibility and immersiveness. In the current research, assessment measurements for technical and non-technical skills are developed and evaluated. The aim is to observe multidisciplinary surgical teams in the simulated operating room during minimally invasive spinal surgery and objectively assess the performance of the individual team members and the entire team. Moreover, the effectiveness of training methods and surgical techniques or success critical factors, e. g. management of crisis situations, can be captured and objectively assessed in the controlled environment.

  19. 127. ARAII Administrative and technical support building (ARA606) ground floor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    127. ARA-II Administrative and technical support building (ARA-606) ground floor plan. Indicates use of rooms for classrooms, offices, and lunch room. C.A. Sundberg and Associates 866-area-ALPR-606-A-2. Date: June 1958. Ineel index code no. 070-0606-00-822-102825. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  20. Comparison between mixed and laminar airflow systems in operating rooms and the influence of human factors: experiences from a Swedish orthopedic center.

    PubMed

    Erichsen Andersson, Annette; Petzold, Max; Bergh, Ingrid; Karlsson, Jón; Eriksson, Bengt I; Nilsson, Kerstin

    2014-06-01

    The importance of laminar airflow systems in operating rooms as protection from surgical site infections has been questioned. The aim of our study was to explore the differences in air contamination rates between displacement ventilation and laminar airflow systems during planned and acute orthopedic implant surgery. A second aim was to compare the influence of the number of people present, the reasons for traffic flow, and the door-opening rates between the 2 systems. Active air sampling and observations were made during 63 orthopedic implant operations. The laminar airflow system resulted in a reduction of 89% in colony forming units in comparison with the displacement system (P < .001). The air samples taken in the preparation rooms showed high levels of bacterial growth (≈ 40 CFU/m(3)). Our study shows that laminar airflow-ventilated operating rooms offer high-quality air during surgery, with very low levels of colony forming units close to the surgical wound. The continuous maintenance of laminar air flow and other technical systems are crucial, because minor failures in complex systems like those in operating rooms can result in a detrimental effect on air quality and jeopardize the safety of patients. The technical ventilation solutions are important, but they do not guarantee clean air, because many other factors, such as the organization of the work and staff behavior, influence air cleanliness. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  1. Full immersion simulation: validation of a distributed simulation environment for technical and non-technical skills training in Urology.

    PubMed

    Brewin, James; Tang, Jessica; Dasgupta, Prokar; Khan, Muhammad S; Ahmed, Kamran; Bello, Fernando; Kneebone, Roger; Jaye, Peter

    2015-07-01

    To evaluate the face, content and construct validity of the distributed simulation (DS) environment for technical and non-technical skills training in endourology. To evaluate the educational impact of DS for urology training. DS offers a portable, low-cost simulated operating room environment that can be set up in any open space. A prospective mixed methods design using established validation methodology was conducted in this simulated environment with 10 experienced and 10 trainee urologists. All participants performed a simulated prostate resection in the DS environment. Outcome measures included surveys to evaluate the DS, as well as comparative analyses of experienced and trainee urologist's performance using real-time and 'blinded' video analysis and validated performance metrics. Non-parametric statistical methods were used to compare differences between groups. The DS environment demonstrated face, content and construct validity for both non-technical and technical skills. Kirkpatrick level 1 evidence for the educational impact of the DS environment was shown. Further studies are needed to evaluate the effect of simulated operating room training on real operating room performance. This study has shown the validity of the DS environment for non-technical, as well as technical skills training. DS-based simulation appears to be a valuable addition to traditional classroom-based simulation training. © 2014 The Authors BJU International © 2014 BJU International Published by John Wiley & Sons Ltd.

  2. Feasibility of touch-less control of operating room lights.

    PubMed

    Hartmann, Florian; Schlaefer, Alexander

    2013-03-01

    Today's highly technical operating rooms lead to fairly complex surgical workflows where the surgeon has to interact with a number of devices, including the operating room light. Hence, ideally, the surgeon could direct the light without major disruption of his work. We studied whether a gesture tracking-based control of an automated operating room light is feasible. So far, there has been little research on control approaches for operating lights. We have implemented an exemplary setup to mimic an automated light controlled by a gesture tracking system. The setup includes a articulated arm to position the light source and an off-the-shelf RGBD camera to detect the user interaction. We assessed the tracking performance using a robot-mounted hand phantom and ran a number of tests with 18 volunteers to evaluate the potential of touch-less light control. All test persons were comfortable with using the gesture-based system and quickly learned how to move a light spot on flat surface. The hand tracking error is direction-dependent and in the range of several centimeters, with a standard deviation of less than 1 mm and up to 3.5 mm orthogonal and parallel to the finger orientation, respectively. However, the subjects had no problems following even more complex paths with a width of less than 10 cm. The average speed was 0.15 m/s, and even initially slow subjects improved over time. Gestures to initiate control can be performed in approximately 2 s. Two-thirds of the subjects considered gesture control to be simple, and a majority considered it to be rather efficient. Implementation of an automated operating room light and touch-less control using an RGBD camera for gesture tracking is feasible. The remaining tracking error does not affect smooth control, and the use of the system is intuitive even for inexperienced users.

  3. OR.NET: multi-perspective qualitative evaluation of an integrated operating room based on IEEE 11073 SDC.

    PubMed

    Rockstroh, M; Franke, S; Hofer, M; Will, A; Kasparick, M; Andersen, B; Neumuth, T

    2017-08-01

    Clinical working environments have become very complex imposing many different tasks in diagnosis, medical treatment, and care procedures. During the German flagship project OR.NET, more than 50 partners developed technologies for an open integration of medical devices and IT systems in the operating room. The aim of the present work was to evaluate a large set of the proposed concepts from the perspectives of various stakeholders. The demonstration OR is focused on interventions from the head and neck surgery and was developed in close cooperation with surgeons and numerous colleagues of the project partners. The demonstration OR was qualitatively evaluated including technical as well as clinical aspects. In the evaluation, a questionnaire was used to obtain feedback from hospital operators. The clinical implications were covered by structured interviews with surgeons, anesthesiologists and OR staff. In the present work, we qualitatively evaluate a subset of the proposed concepts from the perspectives of various stakeholders. The feedback of the clinicians indicates that there is a need for a flexible data and control integration. The hospital operators stress the need for tools to simplify risk management in openly integrated operating rooms. The implementation of openly integrated operating rooms will positively affect the surgeons, the anesthesiologists, the surgical nursing staff, as well as the technical personnel and the hospital operators. The evaluation demonstrated the need for OR integration technologies and identified the missing tools to support risk management and approval as the main barriers for future installments.

  4. 34. SITE BUILDING 002 SCANNER BUILDING ROOM 105 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. SITE BUILDING 002 - SCANNER BUILDING - ROOM 105 - CHILLER ROOM, SHOWING SINGLE COMPRESSOR, LIQUID CHILLERS AND "CHILLED WATER RETURN", COOLING TOWER 'TOWER WATER RETURN" AND 'TOWER WATER SUPPLY" LINES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. Challenges and opportunities for multi-functional oxide thin films for voltage tunable radio frequency/microwave components

    NASA Astrophysics Data System (ADS)

    Subramanyam, Guru; Cole, M. W.; Sun, Nian X.; Kalkur, Thottam S.; Sbrockey, Nick M.; Tompa, Gary S.; Guo, Xiaomei; Chen, Chonglin; Alpay, S. P.; Rossetti, G. A.; Dayal, Kaushik; Chen, Long-Qing; Schlom, Darrell G.

    2013-11-01

    There has been significant progress on the fundamental science and technological applications of complex oxides and multiferroics. Among complex oxide thin films, barium strontium titanate (BST) has become the material of choice for room-temperature-based voltage-tunable dielectric thin films, due to its large dielectric tunability and low microwave loss at room temperature. BST thin film varactor technology based reconfigurable radio frequency (RF)/microwave components have been demonstrated with the potential to lower the size, weight, and power needs of a future generation of communication and radar systems. Low-power multiferroic devices have also been recently demonstrated. Strong magneto-electric coupling has also been demonstrated in different multiferroic heterostructures, which show giant voltage control of the ferromagnetic resonance frequency of more than two octaves. This manuscript reviews recent advances in the processing, and application development for the complex oxides and multiferroics, with the focus on voltage tunable RF/microwave components. The over-arching goal of this review is to provide a synopsis of the current state-of the-art of complex oxide and multiferroic thin film materials and devices, identify technical issues and technical challenges that need to be overcome for successful insertion of the technology for both military and commercial applications, and provide mitigation strategies to address these technical challenges.

  6. Technical Tension Between Achieving Particulate and Molecular Organic Environmental Cleanliness: Data from Astromaterial Curation Laboratories

    NASA Technical Reports Server (NTRS)

    Allton, J. H.; Burkett, P. J.

    2011-01-01

    NASA Johnson Space Center operates clean curation facilities for Apollo lunar, Antarctic meteorite, stratospheric cosmic dust, Stardust comet and Genesis solar wind samples. Each of these collections is curated separately due unique requirements. The purpose of this abstract is to highlight the technical tensions between providing particulate cleanliness and molecular cleanliness, illustrated using data from curation laboratories. Strict control of three components are required for curating samples cleanly: a clean environment; clean containers and tools that touch samples; and use of non-shedding materials of cleanable chemistry and smooth surface finish. This abstract focuses on environmental cleanliness and the technical tension between achieving particulate and molecular cleanliness. An environment in which a sample is manipulated or stored can be a room, an enclosed glovebox (or robotic isolation chamber) or an individual sample container.

  7. An ethnographic study of differentiated practice in an operating room.

    PubMed

    Graff, C; Roberts, K; Thornton, K

    1999-01-01

    An ethnographic study was conducted to investigate implementation of the clinical nurse III or team leader (TL) role as part of a newly executed nursing differentiated practice model. The six TLs studied were employed in the operating room (OR). Through participant observation, interviews, and document analysis, the TL role--as well as perceptions of the role by the TLs and OR staff--were studied. Problems related to performance of the role and its evolutionary process were delineated. Data analysis involved identifying categories and subcategories of data and developing a coding system to identify themes. Salient themes were related to the culture of the OR. Because of the OR's highly technical environment, the TLs defined their roles in relation to the organizational and technical needs of their surgical service. Refinement of surgeon "preference cards" and "instrument count sheets" was considered the initial priority for the TLs. Various controllable and uncontrollable factors were identified that affected implementation of the new TL role. Findings suggest that introduction of the role requires insight into setting and an emphasis on staging and orientation of employees to the new role.

  8. Validation of a structured training and assessment curriculum for technical skill acquisition in minimally invasive surgery: a randomized controlled trial.

    PubMed

    Palter, Vanessa N; Orzech, Neil; Reznick, Richard K; Grantcharov, Teodor P

    2013-02-01

    : To develop and validate an ex vivo comprehensive curriculum for a basic laparoscopic procedure. : Although simulators have been well validated as tools to teach technical skills, their integration into comprehensive curricula is lacking. Moreover, neither the effect of ex vivo training on learning curves in the operating room (OR), nor the effect on nontechnical proficiency has been investigated. : This randomized single-blinded prospective trial allocated 20 surgical trainees to a structured training and assessment curriculum (STAC) group or conventional residency training. The STAC consisted of case-based learning, proficiency-based virtual reality training, laparoscopic box training, and OR participation. After completion of the intervention, all participants performed 5 sequential laparoscopic cholecystectomies in the OR. The primary outcome measure was the difference in technical performance between the 2 groups during the first laparoscopic cholecystectomy. Secondary outcome measures included differences with respect to learning curves in the OR, technical proficiency of each sequential laparoscopic cholecystectomy, and nontechnical skills. : Residents in the STAC group outperformed residents in the conventional group in the first (P = 0.004), second (P = 0.036), third (P = 0.021), and fourth (P = 0.023) laparoscopic cholecystectomies. The conventional group demonstrated a significant learning curve in the OR (P = 0.015) in contrast to the STAC group (P = 0.032). Residents in the STAC group also had significantly higher nontechnical skills (P = 0.027). : Participating in the STAC shifted the learning curve for a basic laparoscopic procedure from the operating room into the simulation laboratory. STAC-trained residents had superior technical proficiency in the OR and nontechnical skills compared with conventionally trained residents. (The study registration ID is NCT01560494.).

  9. The 'Room within a Room' Concept for Monitored Warhead Dismantlement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tanner, Jennifer E.; Benz, Jacob M.; White, Helen

    2014-12-01

    Over the past 10 years, US and UK experts have engaged in a technical collaboration with the aim of improving scientific and technological abilities in support of potential future nuclear arms control and non-proliferation agreements. In 2011 a monitored dismantlement exercise provided an opportunity to develop and test potential monitoring technologies and approaches. The exercise followed a simulated nuclear object through a dismantlement process and looked to explore, with a level of realism, issues surrounding device and material monitoring, chain of custody, authentication and certification of equipment, data management and managed access. This paper focuses on the development and deploymentmore » of the ‘room-within-a-room’ system, which was designed to maintain chain of custody during disassembly operations. A key challenge for any verification regime operating within a nuclear weapon complex is to provide the monitoring party with the opportunity to gather sufficient evidence, whilst protecting sensitive or proliferative information held by the host. The requirement to address both monitoring and host party concerns led to a dual function design which: • Created a controlled boundary around the disassembly process area which could provide evidence of unauthorised diversion activities. • Shielded sensitive disassembly operations from monitoring party observation. The deployed room-within-a-room was an integrated system which combined a number of chain of custody technologies (i.e. cameras, tamper indicating panels and enclosures, seals, unique identifiers and radiation portals) and supporting deployment procedures. This paper discusses the bounding aims and constraints identified by the monitoring and host parties with respect to the disassembly phase, the design of the room-within-a-room system, lessons learned during deployment, conclusions and potential areas of future work. Overall it was agreed that the room-within-a-room approach was effective but the individual technologies used to create the system deployed during this exercise required further development.« less

  10. Challenges and opportunities for multi-functional oxide thin films for voltage tunable radio frequency/microwave components

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Subramanyam, Guru, E-mail: gsubramanyam1@udayton.edu; Cole, M. W., E-mail: melanie.w.cole.civ@mail.mil; Sun, Nian X.

    2013-11-21

    There has been significant progress on the fundamental science and technological applications of complex oxides and multiferroics. Among complex oxide thin films, barium strontium titanate (BST) has become the material of choice for room-temperature-based voltage-tunable dielectric thin films, due to its large dielectric tunability and low microwave loss at room temperature. BST thin film varactor technology based reconfigurable radio frequency (RF)/microwave components have been demonstrated with the potential to lower the size, weight, and power needs of a future generation of communication and radar systems. Low-power multiferroic devices have also been recently demonstrated. Strong magneto-electric coupling has also been demonstratedmore » in different multiferroic heterostructures, which show giant voltage control of the ferromagnetic resonance frequency of more than two octaves. This manuscript reviews recent advances in the processing, and application development for the complex oxides and multiferroics, with the focus on voltage tunable RF/microwave components. The over-arching goal of this review is to provide a synopsis of the current state-of the-art of complex oxide and multiferroic thin film materials and devices, identify technical issues and technical challenges that need to be overcome for successful insertion of the technology for both military and commercial applications, and provide mitigation strategies to address these technical challenges.« less

  11. Observation of behavioural markers of non-technical skills in the operating room and their relationship to intra-operative incidents.

    PubMed

    Siu, Joey; Maran, Nikki; Paterson-Brown, Simon

    2016-06-01

    The importance of non-technical skills in improving surgical safety and performance is now well recognised. Better understanding is needed of the impact that non-technical skills of the multi-disciplinary theatre team have on intra-operative incidents in the operating room (OR) using structured theatre-based assessment. The interaction of non-technical skills that influence surgical safety of the OR team will be explored and made more transparent. Between May-August 2013, a range of procedures in general and vascular surgery in the Royal Infirmary of Edinburgh were performed. Non-technical skills behavioural markers and associated intra-operative incidents were recorded using established behavioural marking systems (NOTSS, ANTS and SPLINTS). Adherence to the surgical safety checklist was also observed. A total of 51 procedures were observed, with 90 recorded incidents - 57 of which were considered avoidable. Poor situational awareness was a common area for surgeons and anaesthetists leading to most intra-operative incidents. Poor communication and teamwork across the whole OR team had a generally large impact on intra-operative incidents. Leadership was shown to be an essential set of skills for the surgeons as demonstrated by the high correlation of poor leadership with intra-operative incidents. Team-working and management skills appeared to be especially important for anaesthetists in the recovery from an intra-operative incident. A significant number of avoidable incidents occur during operative procedures. These can all be linked to failures in non-technical skills. Better training of both individual and team in non-technical skills is needed in order to improve patient safety in the operating room. Copyright © 2014 Royal College of Surgeons of Edinburgh (Scottish charity number SC005317) and Royal College of Surgeons in Ireland. Published by Elsevier Ltd. All rights reserved.

  12. Technical Basis for Physical Fidelity of NRC Control Room Training Simulators for Advanced Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minsk, Brian S.; Branch, Kristi M.; Bates, Edward K.

    2009-10-09

    The objective of this study is to determine how simulator physical fidelity influences the effectiveness of training the regulatory personnel responsible for examination and oversight of operating personnel and inspection of technical systems at nuclear power reactors. It seeks to contribute to the U.S. Nuclear Regulatory Commission’s (NRC’s) understanding of the physical fidelity requirements of training simulators. The goal of the study is to provide an analytic framework, data, and analyses that inform NRC decisions about the physical fidelity requirements of the simulators it will need to train its staff for assignment at advanced reactors. These staff are expected tomore » come from increasingly diverse educational and experiential backgrounds.« less

  13. Materials Science Clean Room Facility at Tulane University (Final Technical Report)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Altiero, Nicholas

    2010-09-30

    The project involves conversion of a 3,000 sq. ft. area into a clean room facility for materials science research. It will be accomplished in phases. Phase I will involve preparation of the existing space, acquisition and installation of clean room equipped with a pulsed laser deposition (PLD) processing system, and conversion of ancillary space to facilitate the interface with the clean room. From a capital perspective, Phases II and III will involve the acquisition of additional processing, fabrication, and characterization equipment and capabilities.

  14. KSC-06pd0396

    NASA Image and Video Library

    2006-03-01

    KENNEDY SPACE CENTER, FLA. - The Operations Support Building II at NASA's Kennedy Space Center is seen here, newly built and landscaped. The building replaced modular housing and trailers in the Launch Complex 39 area. The five-story, 189,000-square-foot building consists of approximately 860 office spaces, training rooms, computer rooms, multimedia conference rooms, technical libraries, and a 352-person mission conference center with observation deck. Photo credit: Cory Huston

  15. Cognitive training for technical and non-technical skills in robotic surgery: a randomised controlled trial.

    PubMed

    Raison, Nicholas; Ahmed, Kamran; Abe, Takashige; Brunckhorst, Oliver; Novara, Giacomo; Buffi, Nicolò; McIlhenny, Craig; van der Poel, Henk; van Hemelrijck, Mieke; Gavazzi, Andrea; Dasgupta, Prokar

    2018-05-07

    To investigate the effectiveness of motor imagery (MI) for technical skill and non-technical skill (NTS) training in minimally invasive surgery (MIS). A single-blind, parallel-group randomised controlled trial was conducted at the Vattikuti Institute of Robotic Surgery, King's College London. Novice surgeons were recruited by open invitation in 2015. After basic robotic skills training, participants underwent simple randomisation to either MI training or standard training. All participants completed a robotic urethrovesical anastomosis task within a simulated operating room. In addition to the technical task, participants were required to manage three scripted NTS scenarios. Assessment was performed by five blinded expert surgeons and a NTS expert using validated tools for evaluating technical skills [Global Evaluative Assessment of Robotic Skills (GEARS)] and NTS [Non-Technical Skills for Surgeons (NOTSS)]. Quality of MI was assessed using a revised Movement Imagery Questionnaire (MIQ). In all, 33 participants underwent MI training and 29 underwent standard training. Interrater reliability was high, Krippendorff's α = 0.85. After MI training, the mean (sd) GEARS score was significantly higher than after standard training, at 13.1 (3.25) vs 11.4 (2.97) (P = 0.03). There was no difference in mean NOTSS scores, at 25.8 vs 26.4 (P = 0.77). MI training was successful with significantly higher imagery scores than standard training (mean MIQ score 5.1 vs 4.5, P = 0.04). Motor imagery is an effective training tool for improving technical skill in MIS even in novice participants. No beneficial effect for NTS was found. © 2018 The Authors BJU International © 2018 BJU International Published by John Wiley & Sons Ltd.

  16. 75 FR 20816 - Transportation and Related Equipment Technical Advisory Committee; Notice of Partially Closed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... DEPARTMENT OF COMMERCE Bureau of Industry and Security Transportation and Related Equipment Technical Advisory Committee; Notice of Partially Closed Meeting The Transportation and Related Equipment Technical Advisory Committee will meet on May 5, 2010, 9:30 a.m., in the Herbert C. Hoover Building, Room 6087B, 14th Street between Constitution &...

  17. 77 FR 74658 - Texas Eastern Transmission, LP; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ...-captioned proceeding \\1\\ directed that a technical conference be held to address issues raised by Texas... adjustments. \\1\\ Texas Eastern Transmission, LP, 141 FERC ]61,172 (2012). Take notice that a technical conference will be held on Tuesday, January 15, 2013 at 9:30 a.m., in a room to be designated at the offices...

  18. Development, initial reliability and validity testing of an observational tool for assessing technical skills of operating room nurses.

    PubMed

    Sevdalis, Nick; Undre, Shabnam; Henry, Janet; Sydney, Elaine; Koutantji, Mary; Darzi, Ara; Vincent, Charles A

    2009-09-01

    The recent emergence of the Systems Approach to the safety and quality of surgical care has triggered individual and team skills training modules for surgeons and anaesthetists and relevant observational assessment tools have been developed. To develop an observational tool that captures operating room (OR) nurses' technical skill and can be used for assessment and training. The Imperial College Assessment of Technical Skills for Nurses (ICATS-N) assesses (i) gowning and gloving, (ii) setting up instrumentation, (iii) draping, and (iv) maintaining sterility. Three to five observable behaviours have been identified for each skill and are rated on 1-6 scales. Feasibility and aspects of reliability and validity were assessed in 20 simulation-based crisis management training modules for trainee nurses and doctors, carried out in a Simulated Operating Room. The tool was feasible to use in the context of simulation-based training. Satisfactory reliability (Cronbach alpha) was obtained across trainers' and trainees' scores (analysed jointly and separately). Moreover, trainer nurse's ratings of the four skills correlated positively, thus indicating adequate content validity. Trainer's and trainees' ratings did not correlate. Assessment of OR nurses' technical skill is becoming a training priority. The present evidence suggests that the ICATS-N could be considered for use as an assessment/training tool for junior OR nurses.

  19. Strategies for increasing the feasibility of performance assessments during competency-based education: Subjective and objective evaluations correlate in the operating room.

    PubMed

    Szasz, Peter; Louridas, Marisa; Harris, Kenneth A; Grantcharov, Teodor P

    2017-08-01

    Competency-based education necessitates assessments that determine whether trainees have acquired specific competencies. The evidence on the ability of internal raters (staff surgeons) to provide accurate assessments is mixed; however, this has not yet been directly explored in the operating room. This study's objective is to compare the ratings given by internal raters vs an expert external rater (independent to the training process) in the operating room. Raters assessed general surgery residents during a laparoscopic cholecystectomy for their technical and nontechnical performance. Fifteen cases were observed. There was a moderately positive correlation (r s = .618, P = .014) for technical performance and a strong positive correlation (r s = .731, P = .002) for nontechnical performance. The internal raters were less stringent for technical (mean rank 3.33 vs 8.64, P = .007) and nontechnical (mean rank 3.83 vs 8.50, P = .01) performances. This study provides evidence to help operationalize competency-based assessments. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Novel Nanocomposite Structures as Active and Passive Barrier Materials

    DTIC Science & Technology

    2010-06-01

    during the course of this ARO-funded project. The development of a novel polymer material based on a diol-functionalized room-temperature ionic liquid ...material based on a diol-functionalized room- temperature ionic liquid (RTIL) monomer led to fabrication of membranes, which were tested for their...stimulant vapor. Technical Report A polymerizable room-temperature ionic liquid (4, Figure 1) was chosen as the starting material for making poly(RTIL

  1. Psychomotor performance measured in a virtual environment correlates with technical skills in the operating room.

    PubMed

    Kundhal, Pavi S; Grantcharov, Teodor P

    2009-03-01

    This study was conducted to validate the role of virtual reality computer simulation as an objective method for assessing laparoscopic technical skills. The authors aimed to investigate whether performance in the operating room, assessed using a modified Objective Structured Assessment of Technical Skill (OSATS), correlated with the performance parameters registered by a virtual reality laparoscopic trainer (LapSim). The study enrolled 10 surgical residents (3 females) with a median of 5.5 years (range, 2-6 years) since graduation who had similar limited experience in laparoscopic surgery (median, 5; range, 1-16 laparoscopic cholecystectomies). All the participants performed three repetitions of seven basic skills tasks on the LapSim laparoscopic trainer and one laparoscopic cholecystectomy in the operating room. The operating room procedure was video recorded and blindly assessed by two independent observers using a modified OSATS rating scale. Assessment in the operating room was based on three parameters: time used, error score, and economy of motion score. During the tasks on the LapSim, time, error (tissue damage and millimeters of tissue damage [tasks 2-6], error score [incomplete target areas, badly placed clips, and dropped clips [task 7]), and economy of movement parameters (path length and angular path) were registered. The correlation between time, economy, and error parameters during the simulated tasks and the operating room procedure was statistically assessed using Spearman's test. Significant correlations were demonstrated between the time used to complete the operating room procedure and time used for task 7 (r (s) = 0.74; p = 0.015). The error score demonstrated during the laparoscopic cholecystectomy correlated well with the tissue damage in three of the seven tasks (p < 0.05), the millimeters of tissue damage during two of the tasks, and the error score in task 7 (r (s) = 0.67; p = 0.034). Furthermore, statistically significant correlations were observed between the economy of motion score from the operative procedure and LapSim's economy parameters (path length and angular path in six of the tasks) (p < 0.05). The current study demonstrated significant correlations between operative performance in the operating room (assessed using a well-validated rating scale) and psychomotor performance in virtual environment assessed by a computer simulator. This provides strong evidence for the validity of the simulator system as an objective tool for assessing laparoscopic skills. Virtual reality simulation can be used in practice to assess technical skills relevant for minimally invasive surgery.

  2. "Attention on the flight deck": what ambulatory care providers can learn from pilots about complex coordinated actions.

    PubMed

    Frankel, Richard M; Saleem, Jason J

    2013-12-01

    Technical and interpersonal challenges of using electronic health records (EHRs) in ambulatory care persist. We use cockpit communication as an example of highly coordinated complex activity during flight and compare it with providers' communication when computers are used in the exam room. Maximum variation sampling was used to identify two videotapes from a parent study of primary care physicians' exam room computer demonstrating the greatest variation. We then produced and analyzed visualizations of the time providers spent looking at the computer and looking at the patient. Unlike the cockpit which is engineered to optimize joint attention on complex coordinated activities, we found polar extremes in the use of joint focus of attention to manage the medical encounter. We conclude that there is a great deal of room for improving the balance of interpersonal and technical attention that occurs in routine ambulatory visits in which computers are present in the exam room. Using well-known aviation practices can help primary care providers become more aware of the opportunities and challenges for enhancing the physician patient relationship in an era of exam room computing. Published by Elsevier Ireland Ltd.

  3. 77. View of interior of room 115, building no. 102, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    77. View of interior of room 115, building no. 102, with technical publications and equipment for testing. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  4. Energy Efficiency in Small Server Rooms: Field Surveys and Findings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cheung, Iris; Greenberg, Steve; Mahdavi, Roozbeh

    Fifty-seven percent of US servers are housed in server closets, server rooms, and localized data centers, in what are commonly referred to as small server rooms, which comprise 99percent of all server spaces in the US. While many mid-tier and enterprise-class data centers are owned by large corporations that consider energy efficiency a goal to minimize business operating costs, small server rooms typically are not similarly motivated. They are characterized by decentralized ownership and management and come in many configurations, which creates a unique set of efficiency challenges. To develop energy efficiency strategies for these spaces, we surveyed 30 smallmore » server rooms across eight institutions, and selected four of them for detailed assessments. The four rooms had Power Usage Effectiveness (PUE) values ranging from 1.5 to 2.1. Energy saving opportunities ranged from no- to low-cost measures such as raising cooling set points and better airflow management, to more involved but cost-effective measures including server consolidation and virtualization, and dedicated cooling with economizers. We found that inefficiencies mainly resulted from organizational rather than technical issues. Because of the inherent space and resource limitations, the most effective measure is to operate servers through energy-efficient cloud-based services or well-managed larger data centers, rather than server rooms. Backup power requirement, and IT and cooling efficiency should be evaluated to minimize energy waste in the server space. Utility programs are instrumental in raising awareness and spreading technical knowledge on server operation, and the implementation of energy efficiency measures in small server rooms.« less

  5. Migration of Older to New Digital Control Systems in Nuclear Power Plant Main Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kovesdi, Casey Robert; Joe, Jeffrey Clark

    The United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) has the primary mission to advance nuclear power by resolving socio-technical issues through research and development (R&D). One DOE-NE activity supporting this mission is the Light Water Reactor Sustainability (LWRS) program. LWRS has the overall objective to sustain the operation of existing commercial nuclear power plants (NPPs) through conducting R&D across multiple “pathways,” or R&D focus areas. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systemsmore » in operating U.S. NPPs. This work involves (1) ensuring that legacy analog II&C systems are not life-limiting issues for the LWR fleet, and (2) implementing digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Under the LWRS Advanced II&C pathway, Human Factors experts at Idaho National Laboratory (INL) have been conducting R&D in support of NPP main control room (MCR) modernization activities. Work in prior years has focused on migrating analog I&C systems to new digital I&C systems (). In fiscal year 2016 (FY16), one new focus area for this research is migrating older digital I&C systems to new and advanced digital I&C systems. This report summarizes a plan for conducting a digital-to-digital migration of a legacy digital I&C system to a new digital I&C system in support of control room modernization activities.« less

  6. OR2020: The Operating Room of the Future

    DTIC Science & Technology

    2004-05-01

    25 3.3 Technical Requirements: Standards and Tools for Improved Operating R oom Process Integration...Image processing and visualization tools must be made available to the operating room. 5. Communications issues must be addressed and aim toward...protocols for effectively performing advanced surgeries and using telecommunications-ready tools as needed. The following recommendations were made

  7. 79. View of interior of room 114, supervisor's office, transmitter ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    79. View of interior of room 114, supervisor's office, transmitter building no. 102, with microfiche viewer and technical publications. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  8. 75 FR 7987 - Energy Conservation Standards for Residential Clothes Dryers and Room Air Conditioners: Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Availability of the Preliminary Technical Support Document AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of public meeting and availability of preliminary technical... from these analyses that DOE could consider for these products. DOE also encourages written comments on...

  9. [System of technical facilities for equipping the anesthesiologist's work place in the operating room].

    PubMed

    Burlakov, R I; Iurevich, V M

    1981-01-01

    The authors proved the advisability of complex technical provision for certain functional cycles, or parts of medical technological process. The example given is a modification of working place for anesthesiologist at the operating theatre. Principle and additional devices included in the complex are specified.

  10. 76 FR 20364 - Notice of Proposed Information Collection: Comment Request; Technical Assistance for Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...

  11. Basics of robotics and manipulators in endoscopic surgery.

    PubMed

    Rininsland, H H

    1993-06-01

    The experience with sophisticated remote handling systems for nuclear operations in inaccessible rooms can to a large extent be transferred to the development of robotics and telemanipulators for endoscopic surgery. A telemanipulator system is described consisting of manipulator, endeffector and tools, 3-D video-endoscope, sensors, intelligent control system, modeling and graphic simulation and man-machine interfaces as the main components or subsystems. Such a telemanipulator seems to be medically worthwhile and technically feasible, but needs a lot of effort from different scientific disciplines to become a safe and reliable instrument for future endoscopic surgery.

  12. The uncertainty room: strategies for managing uncertainty in a surgical waiting room.

    PubMed

    Stone, Anne M; Lammers, John C

    2012-01-01

    To describe experiences of uncertainty and management strategies for staff working with families in a hospital waiting room. A 288-bed, nonprofit community hospital in a Midwestern city. Data were collected during individual, semistructured interviews with 3 volunteers, 3 technical staff members, and 1 circulating nurse (n = 7), and during 40 hours of observation in a surgical waiting room. Interview transcripts were analyzed using constant comparative techniques. The surgical waiting room represents the intersection of several sources of uncertainty that families experience. Findings also illustrate the ways in which staff manage the uncertainty of families in the waiting room by communicating support. Staff in surgical waiting rooms are responsible for managing family members' uncertainty related to insufficient information. Practically, this study provided some evidence that staff are expected to help manage the uncertainty that is typical in a surgical waiting room, further highlighting the important role of communication in improving family members' experiences.

  13. Factors that influence the non-technical skills performance of scrub nurses: a prospective study.

    PubMed

    Kang, Evelyn; Massey, Debbie; Gillespie, Brigid M

    2015-12-01

    To identify and describe the factors that impact on the performance of scrub nurses' non-technical skills performance during the intra-operative phase of surgery. Non-technical skills have been identified as important precursors to errors in the operating room. However, few studies have investigated factors influencing non-technical skills of scrub nurses. Prospective observational study. Structured observations were performed on a sample of 182 surgical procedures across eight specialities by two trained observers from August 2012-April 2013 at two hospital sites. Participants were purposively selected scrub nurses. Bivariate correlations and a multiple linear regression model were used to identify associations among length of surgery, patients' acuity using the American Society of Anesthesiologists classification system, team familiarity, number of occasions scout nurses leave the operating room, change of scout nurse and the outcome, the non-technical skills performance of scrub nurses. Patient acuity and team familiarity were the strongest predictors of scrub nurses' non-technical skills performance at hospital site A. There were no correlations between the predictors and the performance of scrub nurses at hospital site B. A dedicated surgical team and patient acuity potentially influence the performance of scrub nurses' non-technical skills. Familiarity with team members foster advanced planning, thus minimizing distractions and interruptions that impact on scrub nurses' performance. Development of interventions aimed at improving non-technical skills has the potential to make a substantial difference and enhance patient care. © 2015 John Wiley & Sons Ltd.

  14. [Minimally invasive surgery and robotic surgery: surgery 4.0?].

    PubMed

    Feußner, H; Wilhelm, D

    2016-03-01

    Surgery can only maintain its role in a highly competitive environment if results are continuously improved, accompanied by further reduction of the interventional trauma for patients and with justifiable costs. Significant impulse to achieve this goal was expected from minimally invasive surgery and, in particular, robotic surgery; however, a real breakthrough has not yet been achieved. Accordingly, the new strategic approach of cognitive surgery is required to optimize the provision of surgical treatment. A full scale integration of all modules utilized in the operating room (OR) into a comprehensive network and the development of systems with technical cognition are needed to upgrade the current technical environment passively controlled by the surgeon into an active collaborative support system (surgery 4.0). Only then can the true potential of minimally invasive surgery and robotic surgery be exploited.

  15. BLDG. 30 - APOLLO-SOYUZ TEST PROJECT (ASTP) SIMS - FLIGHT DIRECTION - JSC

    NASA Image and Video Library

    1975-03-20

    S75-23638 (20 March 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center during joint ASTP simulation activity at NASA's Johnson Space Center. The simulations are part of the preparations for the U.S.-USSR Apollo-Soyuz Test Project docking mission in Earth orbit scheduled for July 1975. M.P. Frank (seated, right) is the senior American flight director for the mission. Sigurd A. Sjoberg (in center, checked jacket), JSC Deputy Director, watches some of the console activity. George W.S. Abbey, Technical Assistant to the JSC Director, is standing next to Sjoberg. The television monitor in the background shows Soviet Soyuz crew activity from the Soviet Union.

  16. Bikini scientific resurvey. Volume II. Report of the technical director. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1947-12-01

    Contents: Island and Reef Geology; Submarine Geology; Drilling Operations; Radiobiology Studies; Reef and Lagoon Fishes; Pelagic Fishes; Taxonomy and Teratology of Fishes; Invertebrate Embryology; Vertebrate Embryology; Reef and Lagoon Algae; Chemical Effects of Organisms Upon Sea Water; The Insect Population; Marine Invertebrates; Land Animals; Plankton Studies; Counter-Room Activities; Radiochemical Analyses; Soils Chemistry; Low-Level Radiation Studies; Army Engineering Studies; Aerological Data; Bacteriological Investigations; Radiological Safety; Radiological Health; Technical Director's Summary.

  17. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  18. Mental practice enhances surgical technical skills: a randomized controlled study.

    PubMed

    Arora, Sonal; Aggarwal, Rajesh; Sirimanna, Pramudith; Moran, Aidan; Grantcharov, Teodor; Kneebone, Roger; Sevdalis, Nick; Darzi, Ara

    2011-02-01

    To assess the effects of mental practice on surgical performance. Increasing concerns for patient safety have highlighted a need for alternative training strategies outside the operating room. Mental practice (MP), "the cognitive rehearsal of a task before performance," has been successful in sport and music to enhance skill. This study investigates whether MP enhances performance in laparoscopic surgery. After baseline skills testing, 20 novice surgeons underwent training on an evidence-based virtual reality curriculum. After randomization using the closed envelope technique, all participants performed 5 Virtual Reality (VR) laparoscopic cholecystectomies (LC). Mental practice participants performed 30 minutes of MP before each LC; control participants viewed an online lecture. Technical performance was assessed using video Objective Structured Assessment of Technical Skills-based global ratings scale (scored from 7 to 35). Mental imagery was assessed using a previously validated Mental Imagery Questionnaire. Eighteen participants completed the study. There were no intergroup differences in baseline technical ability. Learning curves were demonstrated for both MP and control groups. Mental practice was superior to control (global ratings) for the first LC (median 20 vs 15, P = 0.005), second LC (20.5 vs 13.5, P = 0.001), third LC (24 vs 15.5, P < 0.001), fourth LC (25.5 vs 15.5, P < 0.001) and the fifth LC (27.5 vs 19.5, P = 0.00). The imagery for the MP group was also significantly superior to the control group across all sessions (P < 0.05). Improved imagery significantly correlated with better quality of performance (ρ 0.51–0.62, Ps < 0.05). This is the first randomized controlled study to show that MP enhances the quality of performance based on VR laparoscopic cholecystectomy. This may be a time- and cost-effective strategy to augment traditional training in the OR thus potentially improving patient care.

  19. Highly immersive virtual reality laparoscopy simulation: development and future aspects.

    PubMed

    Huber, Tobias; Wunderling, Tom; Paschold, Markus; Lang, Hauke; Kneist, Werner; Hansen, Christian

    2018-02-01

    Virtual reality (VR) applications with head-mounted displays (HMDs) have had an impact on information and multimedia technologies. The current work aimed to describe the process of developing a highly immersive VR simulation for laparoscopic surgery. We combined a VR laparoscopy simulator (LapSim) and a VR-HMD to create a user-friendly VR simulation scenario. Continuous clinical feedback was an essential aspect of the development process. We created an artificial VR (AVR) scenario by integrating the simulator video output with VR game components of figures and equipment in an operating room. We also created a highly immersive VR surrounding (IVR) by integrating the simulator video output with a [Formula: see text] video of a standard laparoscopy scenario in the department's operating room. Clinical feedback led to optimization of the visualization, synchronization, and resolution of the virtual operating rooms (in both the IVR and the AVR). Preliminary testing results revealed that individuals experienced a high degree of exhilaration and presence, with rare events of motion sickness. The technical performance showed no significant difference compared to that achieved with the standard LapSim. Our results provided a proof of concept for the technical feasibility of an custom highly immersive VR-HMD setup. Future technical research is needed to improve the visualization, immersion, and capability of interacting within the virtual scenario.

  20. Customisation of an instrument to assess anaesthesiologists' non-technical skills.

    PubMed

    Jepsen, Rikke M H G; Spanager, Lene; Lyk-Jensen, Helle T; Dieckmann, Peter; Østergaard, Doris

    2015-02-22

    The objectives of the study were to identify Danish anaesthesiologists' non-technical skills and to customise the Scottish-developed Anaesthetists' Non-Technical Skills instrument for Danish anaesthesiologists. Six semi-structured group interviews were conducted with 31 operating room team members: anaes-thesiologists, nurse anaesthetists, surgeons, and scrub nurses. Interviews were transcribed verbatim and analysed using directed content analysis. Anaesthesiologists' non-technical skills were identified, coded, and sorted using the original instrument as a basis. The resulting prototype instrument was discussed with anaesthesiologists from 17 centres to ensure face validity. Interviews lasted 46-67 minutes. Identified examples of anaesthesiologists' good or poor non-technical skills fit the four categories in the original instrument: situation awareness; decision making; team working; and task management. Anaesthesiologists' leadership role in the operating room was emphasised: the original 'Task Management' category was named 'Leadership'. One new element, 'Demonstrating self-awareness' was added under the category 'Situation Awareness'. Compared with the original instrument, half of the behavioural markers were new, which reflected that being aware of and communicating one's own abilities to the team; working systematically; and speaking up to avoid adverse events were important skills. The Anaesthetists' Non-Technical Skills instrument was customised to a Danish setting using the identified non-technical skills for anaesthesiologists and the original instrument as basis. The customised instrument comprises four categories and 16 underpinning elements supported by multiple behavioural markers. Identifying non-technical skills through semi-structured group interviews and analysing them using direct content analysis proved a useful method for customising an assessment instrument to another setting.

  1. Objective Assessment of Surgical Technical Skill and Competency in the Operating Room.

    PubMed

    Vedula, S Swaroop; Ishii, Masaru; Hager, Gregory D

    2017-06-21

    Training skillful and competent surgeons is critical to ensure high quality of care and to minimize disparities in access to effective care. Traditional models to train surgeons are being challenged by rapid advances in technology, an intensified patient-safety culture, and a need for value-driven health systems. Simultaneously, technological developments are enabling capture and analysis of large amounts of complex surgical data. These developments are motivating a "surgical data science" approach to objective computer-aided technical skill evaluation (OCASE-T) for scalable, accurate assessment; individualized feedback; and automated coaching. We define the problem space for OCASE-T and summarize 45 publications representing recent research in this domain. We find that most studies on OCASE-T are simulation based; very few are in the operating room. The algorithms and validation methodologies used for OCASE-T are highly varied; there is no uniform consensus. Future research should emphasize competency assessment in the operating room, validation against patient outcomes, and effectiveness for surgical training.

  2. 56. Photocopy of Mechanical drawing, dated August 6, 1976 by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. Photocopy of Mechanical drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. H-12 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - EQUIPMENT ROOM PLANS. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  3. From Searle's Chinese Room to the Mathematics Classroom: Technical and Cognitive Mathematics

    ERIC Educational Resources Information Center

    Gavalas, Dimitris

    2007-01-01

    Employing Searle's views, I begin by arguing that students of Mathematics behave similarly to machines that manage symbols using a set of rules. I then consider two types of Mathematics, which I call "Cognitive Mathematics" and "Technical Mathematics" respectively. The former type relates to concepts and meanings, logic and sense, whilst the…

  4. The use of a checklist improves anaesthesiologists' technical and non-technical performance for simulated malignant hyperthermia management.

    PubMed

    Hardy, Jean-Baptiste; Gouin, Antoine; Damm, Cédric; Compère, Vincent; Veber, Benoît; Dureuil, Bertrand

    2018-02-01

    Anaesthesiologists may occasionally manage life-threatening operating room (OR) emergencies. Managing OR emergencies implies real-time analysis of often complicated situations, prompt medical knowledge retrieval, coordinated teamwork and effective decision making in stressful settings. Checklists are recommended to improve performance and reduce the risk of medical errors. This study aimed to assess the usefulness of the French Society of Anaesthesia and Intensive Care's (SFAR) "Malignant Hyperthermia" (MH) checklist on a simulated episode of MH crisis and management thereof by registered anesthesiologists. Twenty-four anaesthesiologists were allocated to 2 groups (checklist and control). Their technical performance in adherence with the SFAR guidelines was assessed by a 30-point score and their non-technical performance was assessed by the Anaesthetists' Non-Technical Skills (ANTS) score. Every task completion was assessed independently. Data are shown as median (first-third quartiles). Anaesthesiologists in the checklist group had higher technical performance scores (24/30 (21.5-25) vs 18/30 (15.5-19.5), P=0.002) and ANTS scores (56.5/60 (47.5-58) vs 48.5/60 (41-50.5), P=0.024). They administered the complete initial dose of dantrolene (2mg/kg) more quickly (15.7 minutes [13.9-18.3] vs 22.4 minutes [18.6-25]) than the control group (P=0.017). However, anaesthesiologists deemed the usability of the checklist to be perfectible. Registered anaesthesiologists' use of the MH checklist during a simulation session widely improved their adherence to guidelines and non-technical skills. This study strongly suggests the benefit of checklist tools for emergency management. Notwithstanding, better awareness and training for anaesthesiologists could further improve the use of this tool. Copyright © 2017 Société française d'anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.

  5. Trans-venous embolization of a basal ganglia ruptured arteriovenous malformation with open surgical arterial control: A hybrid technique.

    PubMed

    Kulcsár, Zsolt; Machi, Paolo; Schaller, Karl; Lovblad, Karl Olof; Bijlenga, Philippe

    2018-05-01

    Treatment of ruptured deep-seated arteriovenous malformations is challenging and associated with elevated risks. This is due to the proximity or involvement of critical brain structures and the specifically fine and delicate angioarchitecture of these lesions, making both endovascular and surgical access technically complicated. We present the advantages of a true combined, open surgical and endovascular transvenous approach in a hybrid operating room. The technique may overcome in part the difficulties and may improve safety and risk related concerns. Copyright © 2018. Published by Elsevier Masson SAS.

  6. Virtual reality in surgical skills training.

    PubMed

    Palter, Vanessa N; Grantcharov, Teodor P

    2010-06-01

    With recent concerns regarding patient safety, and legislation regarding resident work hours, it is accepted that a certain amount of surgical skills training will transition to the surgical skills laboratory. Virtual reality offers enormous potential to enhance technical and non-technical skills training outside the operating room. Virtual-reality systems range from basic low-fidelity devices to highly complex virtual environments. These systems can act as training and assessment tools, with the learned skills effectively transferring to an analogous clinical situation. Recent developments include expanding the role of virtual reality to allow for holistic, multidisciplinary team training in simulated operating rooms, and focusing on the role of virtual reality in evidence-based surgical curriculum design. Copyright 2010 Elsevier Inc. All rights reserved.

  7. The social computing room: a multi-purpose collaborative visualization environment

    NASA Astrophysics Data System (ADS)

    Borland, David; Conway, Michael; Coposky, Jason; Ginn, Warren; Idaszak, Ray

    2010-01-01

    The Social Computing Room (SCR) is a novel collaborative visualization environment for viewing and interacting with large amounts of visual data. The SCR consists of a square room with 12 projectors (3 per wall) used to display a single 360-degree desktop environment that provides a large physical real estate for arranging visual information. The SCR was designed to be cost-effective, collaborative, configurable, widely applicable, and approachable for naive users. Because the SCR displays a single desktop, a wide range of applications is easily supported, making it possible for a variety of disciplines to take advantage of the room. We provide a technical overview of the room and highlight its application to scientific visualization, arts and humanities projects, research group meetings, and virtual worlds, among other uses.

  8. Fast 3-T MR-guided transrectal prostate biopsy using an in-room tablet device for needle guide alignment: a feasibility study.

    PubMed

    Overduin, Christiaan G; Heidkamp, Jan; Rothgang, Eva; Barentsz, Jelle O; de Lange, Frank; Fütterer, Jurgen J

    2018-05-22

    To assess the feasibility of adding a tablet device inside the scanner room to assist needle-guide alignment during magnetic resonance (MR)-guided transrectal prostate biopsy. Twenty patients with one cancer-suspicious region (CSR) with PI-RADS score ≥ 4 on diagnostic multiparametric MRI were prospectively enrolled. Two orthogonal scan planes of an MR fluoroscopy sequence (~3 images/s) were aligned to the CSR and needle-guide pivoting point. Targeting was achieved by manipulating the needle-guide under MR fluoroscopy feedback on the in-room tablet device. Technical feasibility and targeting success were assessed. Complications and biopsy procedure times were also recorded. Needle-guide alignment with the in-room tablet device was technically successful in all patients and allowed sampling after a single alignment step in 19/20 (95%) CSRs (median size 14 mm, range: 4-45). Biopsy cores contained cancer in 18/20 patients. There were no per-procedural or post-biopsy complications. Using the tablet device, the mean time to first biopsy was 5.8 ± 1.0 min and the mean total procedure time was 23.7 ± 4.1 min. Use of an in-room tablet device to assist needle-guide alignment was feasible and safe during MR-guided transrectal prostate biopsy. Initial experience indicates potential for procedure time reduction. • Performing MR-guided prostate biopsy using an in-room tablet device is feasible. • CSRs could be sampled after a single alignment step in 19/20 patients. • The mean procedure time for biopsy with the tablet device was 23.7 min.

  9. Meningomyelocele Simulation Model: Pre-surgical Management–Technical Report

    PubMed Central

    Angert, Robert M

    2018-01-01

    This technical report describes the creation of a myelomeningocele model of a newborn baby. This is a simple, low-cost, and easy-to-assemble model that allows the medical team to practice the delivery room management of a newborn with myelomeningocele. The report includes scenarios and a suggested checklist with which the model can be employed. PMID:29713576

  10. 77 FR 28375 - Dixie Pipeline Company LLC; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ....1.0.\\1\\ The technical conference will address the issues raised by the protesters in the proceeding and the issues discussed by the Commission in P 19 of the April 27, 2012 order concerning the effect... conference on Wednesday, May 30, 2012, at 9:00 a.m. (EDT), in a room to be designated at the offices of the...

  11. Meningomyelocele Simulation Model: Pre-surgical Management-Technical Report.

    PubMed

    Rosen, Orna; Angert, Robert M

    2018-02-26

    This technical report describes the creation of a myelomeningocele model of a newborn baby. This is a simple, low-cost, and easy-to-assemble model that allows the medical team to practice the delivery room management of a newborn with myelomeningocele. The report includes scenarios and a suggested checklist with which the model can be employed.

  12. Impact of sleep deprivation on anaesthesia residents' non-technical skills: a pilot simulation-based prospective randomized trial.

    PubMed

    Neuschwander, A; Job, A; Younes, A; Mignon, A; Delgoulet, C; Cabon, P; Mantz, J; Tesniere, A

    2017-07-01

    Sleep deprivation is common in anaesthesia residents, but its impact on performance remains uncertain. Non-technical skills (team working, situation awareness, decision making, and task management) are key components of quality of care in anaesthesia, particularly in crisis situations occurring in the operating room. The impact of sleep deprivation on non-technical skills is unknown. We tested the hypothesis that in anaesthesia residents sleep deprivation is associated with impaired non-technical skills. Twenty anaesthesia residents were randomly allocated to undergo a simulation session after a night shift [sleep-deprived (SLD) group, n =10] or after a night of rest [rested (R) group, n =10] from January to March 2015. The simulated scenario was a situation of crisis management in the operating room. The primary end point was a composite score of anaesthetists' non-technical skills (ANTS) assessed by two blinded evaluators. Non-technical skills were significantly impaired in the SLD group [ANTS score 12.2 (interquartile range 10.5-13)] compared with the R group [14.5 (14-15), P <0.02]. This difference was mainly accounted for by a difference in the team working item. On the day of simulation, the SLD group showed increased sleepiness and decreased confidence in anaesthesia skills. In this randomized pilot trial, sleep deprivation was associated with impaired non-technical skills of anaesthesia residents in a simulated anaesthesia intraoperative crisis scenario. NCT02622217. © The Author 2017. Published by Oxford University Press on behalf of the British Journal of Anaesthesia. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  13. Cost and morbidity analysis of chest port insertion in adults: Outpatient clinic versus operating room placement.

    PubMed

    Feo, Claudio F; Ginesu, Giorgio C; Bellini, Alessandro; Cherchi, Giuseppe; Scanu, Antonio M; Cossu, Maria Laura; Fancellu, Alessandro; Porcu, Alberto

    2017-09-01

    Totally implantable venous access devices (TIVADs) represent a convenient way for the administration of medications or nutrients. Traditionally, chest ports have been positioned by surgeons in the operating room, however there has been a transition over the years to port insertion by interventional radiologists in the radiology suite. The optimal method for chest port placement is still under debate. Data on all adult patients undergoing isolated chest port placement at our institution in a 12-year period were retrospectively reviewed. The aim of this cohort study was to compare cost and morbidity for chest port insertion in two different settings: outpatient clinic and operating room. Between 2003 and 2015 a total of 527 chest ports were placed in adult patients. Of them, 262 procedures were performed in the operating room and 265 procedures were undertaken in the outpatient clinic. Patient characteristics were similar and there was no significant difference in early (<30 days, p = 0.54) and late complications (30-120 days, p = 0.53). The average charge for placement of a chest port was 1270 Euros in the operating room versus 620 Euros in the outpatient clinic. Our results suggest that chest ports can be safely placed in most patients under local anesthesia in the office setting without fluoroscopy or ultrasound guidance. Future randomized controlled studies may evaluate if surgeons or interventional radiologists should routinely perform these procedures in a dedicated office setting and reserve more sophisticated facilities only for patients at high risk of technical failure.

  14. 143. ARAIII Control building (ARA607) Floor plan. Shows control room, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    143. ARA-III Control building (ARA-607) Floor plan. Shows control room, contaminated work area, counting and computer room, health physics room, instrument repair room, offices, and other rooms. Aerojet-general 880-area/GCRE-607-A-1. Date: February 1958. Ineel index code no. 063-0607-00-013-102546. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  15. Floating Magnet Demonstration.

    ERIC Educational Resources Information Center

    Wake, Masayoshi

    1990-01-01

    A room-temperature demonstration of a floating magnet using a high-temperature superconductor is described. The setup and operation of the apparatus are described. The technical details of the effect are discussed. (CW)

  16. Safety in the operating room during orthopedic trauma surgery-incidence of adverse events related to technical equipment and logistics.

    PubMed

    van Delft, E A K; Schepers, T; Bonjer, H J; Kerkhoffs, G M M J; Goslings, J C; Schep, N W L

    2018-04-01

    Safety in the operating room is widely debated. Adverse events during surgery are potentially dangerous for the patient and staff. The incidence of adverse events during orthopedic trauma surgery is unknown. Therefore, we performed a study to quantify the incidence of these adverse events. Primary objective was to determine the incidence of adverse events related to technical equipment and logistics. The secondary objective was to evaluate the consequences of these adverse events. We completed a cross-sectional observational study to assess the incidence, consequences and preventability of adverse events related to technical equipment and logistics during orthopedic trauma surgery. During a 10 week period, all orthopedic trauma operations were evaluated by an observer. Six types of procedures were differentiated: osteosynthesis; arthroscopy; removal of hardware; joint replacement; bone grafting and other. Adverse events were divided in six categories: staff dependent factors; patient dependent factors; anaesthesia; imaging equipment; operation room equipment and instruments and implants. Adverse events were defined as any factor affecting the surgical procedure in a negative way. Hundred-fifty operative procedures were included. In 54% of the procedures, at least one adverse event occurred. In total, 147 adverse events occurred, with a range of 1-5 per procedure. Most adverse events occurred during joint replacement procedures. Thirty-seven percent of the incidents concerned defect, incorrect connected or absent instruments. In 36% of the procedures adverse events resulted in a prolonged operation time with a median prolongation of 10.0 min. In more than half of orthopedic trauma surgical procedures adverse events related to technical equipment and logistics occurred, most of them could easily be prevented. These adverse events could endanger the safety of the patient and staff and should therefore be reduced. 4.

  17. Evolution of the Lunar Receiving Laboratory to the Astromaterial Sample Curation Facility: Technical Tensions Between Containment and Cleanliness, Between Particulate and Organic Cleanliness

    NASA Technical Reports Server (NTRS)

    Allton, J. H.; Zeigler, R. A.; Calaway, M. J.

    2016-01-01

    The Lunar Receiving Laboratory (LRL) was planned and constructed in the 1960s to support the Apollo program in the context of landing on the Moon and safely returning humans. The enduring science return from that effort is a result of careful curation of planetary materials. Technical decisions for the first facility included sample handling environment (vacuum vs inert gas), and instruments for making basic sample assessment, but the most difficult decision, and most visible, was stringent biosafety vs ultra-clean sample handling. Biosafety required handling of samples in negative pressure gloveboxes and rooms for containment and use of sterilizing protocols and animal/plant models for hazard assessment. Ultra-clean sample handling worked best in positive pressure nitrogen environment gloveboxes in positive pressure rooms, using cleanable tools of tightly controlled composition. The requirements for these two objectives were so different, that the solution was to design and build a new facility for specific purpose of preserving the scientific integrity of the samples. The resulting Lunar Curatorial Facility was designed and constructed, from 1972-1979, with advice and oversight by a very active committee comprised of lunar sample scientists. The high precision analyses required for planetary science are enabled by stringent contamination control of trace elements in the materials and protocols of construction (e.g., trace element screening for paint and flooring materials) and the equipment used in sample handling and storage. As other astromaterials, especially small particles and atoms, were added to the collections curated, the technical tension between particulate cleanliness and organic cleanliness was addressed in more detail. Techniques for minimizing particulate contamination in sample handling environments use high efficiency air filtering techniques typically requiring organic sealants which offgas. Protocols for reducing adventitious carbon on sample handling surfaces often generate particles. Further work is needed to achieve both minimal particulate and adventitious carbon contamination. This paper will discuss these facility topics and others in the historical context of nearly 50 years' curation experience for lunar rocks and regolith, meteorites, cosmic dust, comet particles, solar wind atoms, and asteroid particles at Johnson Space Center.

  18. FRAMEWORK AND APPLICATION FOR MODELING CONTROL ROOM CREW PERFORMANCE AT NUCLEAR POWER PLANTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L Boring; David I Gertman; Tuan Q Tran

    2008-09-01

    This paper summarizes an emerging project regarding the utilization of high-fidelity MIDAS simulations for visualizing and modeling control room crew performance at nuclear power plants. The key envisioned uses for MIDAS-based control room simulations are: (i) the estimation of human error associated with advanced control room equipment and configurations, (ii) the investigative determination of contributory cognitive factors for risk significant scenarios involving control room operating crews, and (iii) the certification of reduced staffing levels in advanced control rooms. It is proposed that MIDAS serves as a key component for the effective modeling of cognition, elements of situation awareness, and riskmore » associated with human performance in next generation control rooms.« less

  19. [The 'Surgical Deck': a new generation of integrated operational rooms for ENT].

    PubMed

    Strauss, G; Gollnick, I; Neumuth, T; Meixensberger, J; Lueth, T C

    2013-02-01

    Existing operating room concepts do not meet modern technological opportunities anymore. The "Surgical Deck" is supposed to represent a prototype for a new operating room generation. The objective of the project is to achieve a better integration of functions and to develop an innovative concept for a highly developed surgical workstation. 3 working areas are defined: Surgical, Airway and Technical Cockpit. The evaluation was conducted on 284 surgeries carried out from 01.08. 2011 to 31.01. 2012. The evaluation team consisted of 6 surgeons, 3 surgery nurses, 3 anesthesiologists and 4 anesthesia nurses. Within a detailed analysis, the data of 50 FESS surgeries were compared to those of a control group. Within the FESS group, the average slot time was reduced by 13%. 88.2% of those questioned assessed ergonomics as being better than in the conventional OR. 71.5% stated that the Surgical Deck provided an added value with regard to the surgical procedure. 91.3% confirmed that the system control required additional training. 79.3% described the cost-benefit-ratio as appropriate. For 96% of the surgeries, respondents said that they were feeling adequately supported by the technology. The results show a clear advantage of the system architecture. The Surgical Deck may present a solid foundation with regard to the transfer of the system into the clinical practice. This is relevant for new assistance functions such as process control software or navigation-based collision warning systems. It is to be expected that the project will significantly contribute to further develop the future surgical workstation and its standardization. © Georg Thieme Verlag KG Stuttgart · New York.

  20. 10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM INTERIOR, SHOWING ESCAPE HATCH. Looking north along east wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  1. SIG -- The Role of Human-Computer Interaction in Next-Generation Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L. Boring; Jacques Hugo; Christian Richard

    2005-04-01

    The purpose of this CHI Special Interest Group (SIG) is to facilitate the convergence between human-computer interaction (HCI) and control room design. HCI researchers and practitioners actively need to infuse state-of-the-art interface technology into control rooms to meet usability, safety, and regulatory requirements. This SIG outlines potential HCI contributions to instrumentation and control (I&C) and automation in control rooms as well as to general control room design.

  2. Energy Systems Integration Facility Control Room | Energy Systems

    Science.gov Websites

    Integration Facility | NREL Energy Systems Integration Facility Control Room Energy Systems Integration Facility Control Room The Energy Systems Integration Facility control room allows system engineers as the monitoring point for the facility's integrated safety and control systems. Photo of employees

  3. DO-ALL #18

    EPA Pesticide Factsheets

    Technical product bulletin: this surface washing agent is for oil spill cleanups on beaches, rocks, piers, bilges, decks, waterline scum, rigs, platforms, tanks, barges engine rooms, machinery, and grease traps. Pre-treatment/soaking may be needed.

  4. Environmental tobacco smoke particles in multizone indoor environments

    NASA Astrophysics Data System (ADS)

    Miller, S. L.; Nazaroff, W. W.

    Environmental tobacco smoke (ETS) is a major source of human exposure to airborne particles. To better understand the factors that affect exposure, and to investigate the potential effectiveness of technical control measures, a series of experiments was conducted in a two-room test facility. Particle concentrations, size distributions, and airflow rates were measured during and after combustion of a cigarette. Experiments were varied to obtain information about the effects on exposure of smoker segregation, ventilation modification, and air filtration. The experimental data were used to test the performance of an analytical model of the two-zone environment and a numerical multizone aerosol dynamics model. A respiratory tract particle deposition model was also applied to the results to estimate the mass of ETS particles that would be deposited in the lungs of a nonsmoker exposed in either the smoking or nonsmoking room. Comparisons between the experimental data and model predictions showed good agreement. For time-averaged particle mass concentration, the average bias between model and experiments was less than 10%. The average absolute error was typically 35%, probably because of variability in particle emission rates from cigarettes. For the conditions tested, the use of a portable air filtration unit yielded 65-90% reductions in predicted lung deposition relative to the baseline scenario. The use of exhaust ventilation in the smoking room reduced predicted lung deposition in the nonsmoking room by more than 80%, as did segregating the smoker from nonsmokers with a closed door.

  5. Randomized clinical trial to evaluate mental practice in enhancing advanced laparoscopic surgical performance.

    PubMed

    Louridas, M; Bonrath, E M; Sinclair, D A; Dedy, N J; Grantcharov, T P

    2015-01-01

    Mental practice, the cognitive rehearsal of a task without physical movement, is known to enhance performance in sports and music. Investigation of this technique in surgery has been limited to basic operations. The purpose of this study was to develop mental practice scripts, and to assess their effect on advanced laparoscopic skills and surgeon stress levels in a crisis scenario. Twenty senior surgical trainees were randomized to either conventional training or mental practice groups, the latter being trained by an expert performance psychologist. Participants' skills were assessed while performing a porcine laparoscopic jejunojejunostomy as part of a crisis scenario in a simulated operating room, using the Objective Structured Assessment of Technical Skill (OSATS) and bariatric OSATS (BOSATS) instruments. Objective and subjective stress parameters were measured, as well as non-technical skills using the Non-Technical Skills for Surgeons rating tool. An improvement in OSATS (P = 0.003) and BOSATS (P = 0.003) scores was seen in the mental practice group compared with the conventional training group. Seven of ten trainees improved their technical performance during the crisis scenario, whereas four of the ten conventionally trained participants deteriorated. Mental imagery ability improved significantly following mental practice training (P = 0.011), but not in the conventional group (P = 0.083). No differences in objective or subjective stress levels or non-technical skills were evident. Mental practice improves technical performance for advanced laparoscopic tasks in the simulated operating room, and allows trainees to maintain or improve their performance despite added stress. © 2014 BJS Society Ltd. Published by John Wiley & Sons Ltd.

  6. [Working conditions in operating rooms].

    PubMed

    Kułagowska, Ewa

    2007-01-01

    The aim of this study was to get acquainted with the opinions of the nursing staff on working conditions at their workplace. The study was carried out in a group of 398 nurses working in various kinds of operating rooms at 11 public hospitals. A questionnaire was used as a major tool of this study. The questionnaires were filled in by 259 operating room nurses (circulating nurses) and 139 nurse-anesthetists. The collected data show that working conditions in operating rooms do not ensure safety of the nursing staff at work. The main sources of problems are: work organization, technical factors, work equipment, work space, knowledge of hazards and strenuous factors among nurses, ways of preventing and/or limiting them. These elements are serious occupational risk factors influencing the work process and health status of nurses.

  7. Lighting Control System for Premises with Display Screen Equipment

    NASA Astrophysics Data System (ADS)

    Kudryashov, A. V.

    2017-11-01

    The use of Display Screen Equipment (DSE) at enterprises allows one to increase the productivity and safety of production, minimize the number of personnel and leads to the simplification of the work of specialists, but on the other side, changes usual working conditions. If the personnel works with displays, visual fatigue develops more quickly which contributes to the emergence of nervous tension, stress and possible erroneous actions. Low interest of the lighting control system developers towards the rooms with displays is dictated by special requirements for coverage by sanitary and hygienic standards (limiting excess workplace illumination). We decided to create a combined lighting system which works considering daylight illumination and artificial light sources. The brightness adjustment of the LED lamps is carried out according to the DALI protocol, adjustment of the natural illumination by means of smart glasses. The technical requirements for a lighting control system, the structural-functional scheme and the algorithm for controlling the operation of the system have been developed. The elements of control units, sensors and actuators have been selected.

  8. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... PHMSA-2010-0294] Pipeline Safety: Control Room Management Implementation Workshop AGENCY: Pipeline and...) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued by PHMSA on December 3, 2009, and is open to the public...

  9. A novel interface for the telementoring of robotic surgery.

    PubMed

    Shin, Daniel H; Dalag, Leonard; Azhar, Raed A; Santomauro, Michael; Satkunasivam, Raj; Metcalfe, Charles; Dunn, Matthew; Berger, Andre; Djaladat, Hooman; Nguyen, Mike; Desai, Mihir M; Aron, Monish; Gill, Inderbir S; Hung, Andrew J

    2015-08-01

    To prospectively evaluate the feasibility and safety of a novel, second-generation telementoring interface (Connect(™) ; Intuitive Surgical Inc., Sunnyvale, CA, USA) for the da Vinci robot. Robotic surgery trainees were mentored during portions of robot-assisted prostatectomy and renal surgery cases. Cases were assigned as traditional in-room mentoring or remote mentoring using Connect. While viewing two-dimensional, real-time video of the surgical field, remote mentors delivered verbal and visual counsel, using two-way audio and telestration (drawing) capabilities. Perioperative and technical data were recorded. Trainee robotic performance was rated using a validated assessment tool by both mentors and trainees. The mentoring interface was rated using a multi-factorial Likert-based survey. The Mann-Whitney and t-tests were used to determine statistical differences. We enrolled 55 mentored surgical cases (29 in-room, 26 remote). Perioperative variables of operative time and blood loss were similar between in-room and remote mentored cases. Robotic skills assessment showed no significant difference (P > 0.05). Mentors preferred remote over in-room telestration (P = 0.05); otherwise no significant difference existed in evaluation of the interfaces. Remote cases using wired (vs wireless) connections had lower latency and better data transfer (P = 0.005). Three of 18 (17%) wireless sessions were disrupted; one was converted to wired, one continued after restarting Connect, and the third was aborted. A bipolar injury to the colon occurred during one (3%) in-room mentored case; no intraoperative injuries were reported during remote sessions. In a tightly controlled environment, the Connect interface allows trainee robotic surgeons to be telementored in a safe and effective manner while performing basic surgical techniques. Significant steps remain prior to widespread use of this technology. © 2014 The Authors BJU International © 2014 BJU International Published by John Wiley & Sons Ltd.

  10. Integrating ethics into technical courses: micro-insertion.

    PubMed

    Davis, Michael

    2006-10-01

    Perhaps the most common reason science and engineering faculty give for not including 'ethics' (that is, research ethics, engineering ethics, or some discussion of professional responsibility) in their technical classes is that 'there is no room'. This article 1) describes a technique ('micro-insertion') that introduces ethics (and related topics) into technical courses in small enough units not to push out technical material, 2) explains where this technique might fit into the larger undertaking of integrating ethics into the technical (scientific or engineering) curriculum, and 3) concludes with some quantified evidence (collected over more than a decade) suggesting success. Integrating ethics into science and engineering courses is largely a matter of providing context for what is already being taught, context that also makes the material already being taught seem 'more relevant'.

  11. Open Field Test; Technical Report 14. Disadvantaged Children and Their First School Experiences. ETS-Head Start Longitudinal Study. Technical Report Series.

    ERIC Educational Resources Information Center

    Ward, William C.

    The Open Field Test was used to assess variables that might not be manifested in a more standard testing situation. In this test, the child was shown 10 standard play objects in the room, and was told to do anything he wished with the toys. The tester initiated no interaction with the child and responded minimally to any overture made by the…

  12. Evaluation of the Hydrolab HL4 water-quality sonde and sensors

    USGS Publications Warehouse

    Snazelle, Teri T.

    2017-12-18

    The U.S. Geological Survey (USGS) Hydrologic Instrumentation Facility evaluated three Hydrolab HL4 multiparameter water-quality sondes by OTT Hydromet. The sondes were equipped with temperature, conductivity, pH, dissolved oxygen (DO), and turbidity sensors. The sensors were evaluated for compliance with the USGS National Field Manual for the Collection of Water-Quality Data (NFM) criteria for continuous water-quality monitors and to verify the validity of the manufacturer’s technical specifications. The conductivity sensors were evaluated for the accuracy of the specific conductance (SC) values (conductance at 25 degrees Celsius [oC]), that were calculated by using the vendor default method, Hydrolab Fresh. The HL4’s communication protocols and operating temperature range along with accuracy of the water-quality sensors were tested in a controlled laboratory setting May 1–19, 2016. To evaluate the sonde’s performance in a surface-water field application, an HL4 equipped with temperature, conductivity, pH, DO, and turbidity sensors was deployed June 20–July 22, 2016, at USGS water-monitoring site 02492620, Pearl River at National Space Technology Laboratories (NSTL) Station, Mississippi, located near Bay Saint Louis, Mississippi, and compared to the adjacent well-maintained EXO2 site sonde.The three HL4 sondes met the USGS temperature testing criteria and the manufacturer’s technical specifications for temperature based upon the median room temperature difference between the measured and standard temperatures, but two of the three sondes exceeded the allowable difference criteria at the temperature extremes of approximately 5 and 40 ºC. Two sondes met the USGS criteria for SC. One of the sondes failed the criteria for SC when evaluated in a 100,000-microsiemens-per-centimeter (μS/cm) standard at room temperature, and also failed in a 10,000-μS/cm standard at 5, 15, and 40 ºC. All three sondes met the USGS criteria for pH and DO at room temperature, but one sonde exceeded the allowable difference criteria when tested in pH 5.00 buffer and at 40 ºC. The USGS criteria and the technical specifications for turbidity were met by one sonde in standards ranging from 10 to 3,000 nephelometric turbidity units (NTU). A second sonde met the USGS criteria and the technical specifications except in the 3,000-NTU standard, and the third sonde exceeded the USGS calibration criteria in the 10- and 20-NTU standards and the technical specifications in the 20-NTU standard.Results of the field test showed acceptable performance and revealed that differences in data sample processing between sonde manufacturers may result in variances between the reported measurements when comparing one sonde to another. These variances in data would be more pronounced in dynamic site conditions. The lack of a wiper or other sensor-cleaning device on the DO sensor could prove problematic, and could limit the use of the HL4 to profiling applications or at sites with limited biofouling.

  13. 75 FR 69912 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... 192 and 195 [Docket ID PHMSA-2007-27954] RIN 2137-AE64 Pipeline Safety: Control Room Management/Human... rulemaking; Extension of comment period. SUMMARY: On September 17, 2010, PHMSA published a Control Room... Control Room Management/Human Factors rule at 49 CFR 192.631 and 195.446. The NPRM proposes to expedite...

  14. Technical skills rotation for general surgery residents.

    PubMed

    Gonzalez, Ray I; Martinez, Jose M; Iglesias, Alberto R; Lo Menzo, Emanuele; Hutson, Duane; Sleeman, Danny; Livingstone, Alan S; Madan, Atul K

    2010-06-15

    Technical skills are an important part of any general surgery residency curriculum. With the demands of limited work weeks, it is imperative that educators create novel methods of teaching technical skills to their residents. Our program utilizes a dedicated month to help accomplish this. This study hypothesized that general surgery residents would report a positive effect of a dedicated technical skills rotation. Residents who had undergone a 1 mo rotation in technical skills during their first year were asked to fill out a survey concerning their experience. During the 1-mo rotation, the residents had almost no clinical responsibilities. Teaching of technical skills was performed with various activities, including video content (VC), virtual reality simulators (VR), open foam procedures (OF), laparoscopic box trainers (BT), surgical equipment in-service (SE), and animate sessions (AS). Responses were given on a Likert scale (1-10) with higher numbers being more positive responses. There were seven residents in this study. The residents gave a very positive response to the overall rotation (9.4) and exposure to laparoscopic procedures (9.6). The other responses were enthusiastic as well: exposure to open procedures (8.9) and preparation for operative room (9.4). After their rotation, the residents were comfortable performing a laparoscopic cholecystectomy (9.2), a hand-sewn anastomosis (8.7), and a stapled anastomosis (9.4). The residents found theses activities helpful in increasing order: VC (7.8), VR (8.0), BT (9.0), ES (9.7), OF (9.8), and AS (9.8). A 1-mo dedicated technical skills rotations was perceived to be extremely positive by the residents. The residents felt very comfortable performing a laparoscopic cholecystectomy, a hand-sewn anastomosis, and a stapled anastomosis. With the 80-h work week, alternatives to learning technical skills in the operating room are essential. Further studies need to be performed to determine if this rotation aids in accomplishing this goal. Copyright 2010. Published by Elsevier Inc.

  15. Teleneurosonology: a novel application of transcranial and carotid ultrasound.

    PubMed

    Rubin, Mark N; Barrett, Kevin M; Freeman, W David; Lee Iannotti, Joyce K; Channer, Dwight D; Rabinstein, Alejandro A; Demaerschalk, Bart M

    2015-03-01

    To demonstrate the technical feasibility of interfacing transcranial Doppler (TCD) and carotid "duplex" ultrasonography (CUS) peripherals with telemedicine end points to provide real-time spectral waveform and duplex imaging data for remote review and interpretation. We performed remote TCD and CUS examinations on a healthy, volunteer employee from our institution without known cerebrovascular disease. The telemedicine end point was stationed in our institution's hospital where the neurosonology examinations took place and the control station was in a dedicated telemedicine room in a separate building. The examinations were performed by a postgraduate level neurohospitalist trainee (M.N.R.) and interpreted by an attending vascular neurologist, both with experience in the performance and interpretation of TCD and CUS. Spectral waveform and duplex ultrasound data were successfully transmitted from TCD and CUS instruments through a telemedicine end point to a remote reviewer at a control station. Image quality was preserved in all cases, and technical failures were not encountered. This proof-of-concept study demonstrates the technical feasibility of interfacing TCD and CUS peripherals with a telemedicine end point to provide real-time spectral waveform and duplex imaging data for remote review and interpretation. Medical diagnostic and telemedicine devices should be equipped with interfaces that allow simple transmission of high-quality audio and video information from the medical devices to the telemedicine technology. Further study is encouraged to determine the clinical impact of teleneurosonology. Copyright © 2015 National Stroke Association. Published by Elsevier Inc. All rights reserved.

  16. Baseline Study Methodology for Future Phases of Research on Nuclear Power Plant Control Room Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya Lee; Bower, Gordon Ross; Hill, Rachael Ann

    In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator

  17. Assessing the compatibility of the management of standardized procedures with the complexity of a sociotechnical system: case study of a control room in an oil refinery.

    PubMed

    Saurin, Tarcisio Abreu; Gonzalez, Santiago Sosa

    2013-09-01

    Although the need for the management of complex socio-technical systems (STS) to be compatible with the nature of those systems is widely recognized, there are few guidelines on how to determine the actual extent of this compatibility. The purpose of this study is to assess how compatible the management of standardized procedures (SPs) is with the nature of a complex STS. To this end, a case study was made of a control room in an oil refinery, involving the following stages: (a) delimitation of the investigated STS; (b) description of the STS according to a set of characteristics of complex STS; (c) application of two types of questionnaires to thirty workers - one of them to assess their perceptions about the applicability of seven principles of SPs management in complex STS and the other to determine their perceptions about the actual use of these principles; and (d) a feedback meeting with workers to discuss the results of the assessment. The assessment is discussed in terms of its limitations, usefulness and ease of use of the data collection and analysis tools. Copyright © 2013 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  18. 75 FR 1339 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ...), Building 33, Cloud Room, 53560 Hull Street, San Diego, California 92152. The Committee advises the Office... Session 1. Welcome and Introduction. 2. Working Groups Reports. 3. Industry Presentations. 4. New Business...

  19. 77 FR 11587 - Certain Dimmable Compact Fluorescent Lamps and Products Containing Same; Institution of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... 361100. Technical Consumer Products, Inc., 325 Campus Drive, Aurora, OH 44202. TCP China, Shanghai Office, 2208-2210 Room, 2nd Building, 270 CaoXi, Road, Xuhui District, Shanghai, China. TCP (Shanghai...

  20. The role of simulation in urological training - A quantitative study of practice and opinions.

    PubMed

    Aydin, Abdullatif; Ahmed, Kamran; Shafi, Ahmed M A; Khan, Muhammad Shamim; Dasgupta, Prokar

    2016-12-01

    Over the past few decades, simulation-based training has rapidly been adopted by many centres for effective technical and non-technical skills training, as a supplementary method to traditional operating room experience. The aim of this study is to assess the current practice in training and seek opinion regarding the future role of simulation in urological training. A cross sectional survey was designed and distributed amongst expert and trainee urological surgeons. The survey consisted of twenty-two questions that were split into three sections; Introduction (6), Technical Skills training in urology (10) and Non-technical skills training in urology (6). A total of 91 residents and 172 specialists completed the survey. In both groups, there was an agreed consensus that laparoscopic training and exposure was insufficient as only 21% of trainees and 23% of specialists believed that they had sufficient training in this area. Furthermore, both groups lacked simulation-based training in common urological procedures including nephrectomy (62%), cystoscopy (69-74%), ureteroscopy (47-59%), transurethral resection of the prostate (56-65%) and percutaneous renal surgery (76-73%). 90% of trainees and 70% of specialists believed (agreed and strongly agreed) that there is a role for non-technical skills simulation in urological training. Simulation training has been under-used thus far and trainees face an uphill challenge to enhance their skills and technical abilities in the operating room. Simulation is recommended by both trainees and specialists and may represent one of the solutions to the challenges of safe and effective urology procedural training. Copyright © 2015 Royal College of Surgeons of Edinburgh (Scottish charity number SC005317) and Royal College of Surgeons in Ireland. Published by Elsevier Ltd. All rights reserved.

  1. Human Factors and Technical Considerations for a Computerized Operator Support System Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ulrich, Thomas Anthony; Lew, Roger Thomas; Medema, Heather Dawne

    2015-09-01

    A prototype computerized operator support system (COSS) has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Departmentmore » of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment. A COSS demonstration scenario has been developed for the prototype involving the Chemical & Volume Control System (CVCS) of the PWR simulator. It involves a primary coolant leak outside of containment that would require tripping the reactor if not mitigated in a very short timeframe. The COSS prototype presents a series of operator screens that provide the needed information and soft controls to successfully mitigate the event.« less

  2. A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya; Boring, Ronald; Joe, Jeffrey

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.« less

  3. Gemini Observatory base facility operations: systems engineering process and lessons learned

    NASA Astrophysics Data System (ADS)

    Serio, Andrew; Cordova, Martin; Arriagada, Gustavo; Adamson, Andy; Close, Madeline; Coulson, Dolores; Nitta, Atsuko; Nunez, Arturo

    2016-08-01

    Gemini North Observatory successfully began nighttime remote operations from the Hilo Base Facility control room in November 2015. The implementation of the Gemini North Base Facility Operations (BFO) products was a great learning experience for many of our employees, including the author of this paper, the BFO Systems Engineer. In this paper we focus on the tailored Systems Engineering processes used for the project, the various software tools used in project support, and finally discuss the lessons learned from the Gemini North implementation. This experience and the lessons learned will be used both to aid our implementation of the Gemini South BFO in 2016, and in future technical projects at Gemini Observatory.

  4. Substation alarm multiplexing system (SAMS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ElBadaly, H.; Gaughan, J.; Ward, G.

    1996-03-01

    This paper describes an on going R&D project to develop, design, install, and assess the field performance of an advanced substation alarm system. SAMS provides a highly fault-tolerant system for the reporting of equipment alarms. SAMS separates and identifies each of the multiple alarm contacts, transmits an alarm condition over existing substation two-wire system, and displays the alarm source, and its associated technical information, on a touch-screen monitor inside the substation control room, and a remote central location and on a hand held terminal which may be carried anywhere within the substation. SAMS is currently installed at the Sherman Creekmore » substation in the Bronx for the purpose of a three month field evaluation.« less

  5. The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

    NASA Technical Reports Server (NTRS)

    Shy, Karla S.; Hageman, Jacob J.; Le, Jeanette H.; Sitz, Joel (Technical Monitor)

    2002-01-01

    NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

  6. 8. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS NORTHEAST CORNER. TELEMETRY ROOM VISIBLE THROUGH WINDOWS IN SOUTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 7. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHWEST CORNER. NOTE RAISED FLATFORM IN CENTER OF ROOM. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. History and modern applications of nano-composite materials carrying GA/cm2 current density due to a Bose-Einstein Condensate at room temperature produced by Focused Electron Beam Induced Processing for many extraordinary novel technical applications

    NASA Astrophysics Data System (ADS)

    Koops, Hans W. P.

    2015-12-01

    The discovery of Focused Electron Beam Induced Processing and early applications of this technology led to the possible use of a novel nanogranular material “Koops-GranMat®” using Pt/C and Au/C material. which carries at room temperature a current density > 50 times the current density which high TC superconductors can carry. The explanation for the characteristics of this novel material is given. This fact allows producing novel products for many applications using Dual Beam system having a gas supply and X.Y.T stream data programming and not using GDSII layout pattern control software. Novel products are possible for energy transportation. -distribution.-switching, photon-detection above 65 meV energy for very efficient energy harvesting, for bright field emission electron sources used for vacuum electronic devices like amplifiers for HF electronics, micro-tubes, 30 GHz to 6 THz switching amplifiers with signal to noise ratio >10(!), THz power sources up to 1 Watt, in combination with miniaturized vacuum pumps, vacuum gauges, IR to THz detectors, EUV- and X-Ray sources. Since focusing electron beam induced deposition works also at low energy, selfcloning multibeam-production machines for field emitter lamps, displays, multi-beam - lithography, - imaging, and - inspection, energy harvesting, and power distribution with switches controlling field-emitter arrays for KA of currents but with < 100 V switching voltage are possible. Finally the replacement of HTC superconductors and its applications by the Koops-GranMat® having Koops-Pairs at room temperature will allow the investigation devices similar to Josephson Junctions and its applications now called QUIDART (Quantum interference devices at Room Temperature). All these possibilities will support a revolution in the optical, electric, power, and electronic technology.

  9. Foucault could have been an operating room nurse.

    PubMed

    Riley, Robin; Manias, Elizabeth

    2002-08-01

    Operating room nursing is an under-researched area of nursing practice. The stereotypical image of operating room nursing is one of task- and technically-orientated aspects of practice, where nurses work in a medical model and are dominated by constraints from outside their sphere of influence. This paper explores the possibility of understanding operating room nursing in a different way. Using the work of Michel Foucault to analyse the work of operating room nursing, this paper argues the relevance of the framework for a more in-depth analysis of this specialty area of practice. The concepts of power, discipline and subjectivity are used to demonstrate how operating room nursing is constructed as a discipline and how operating room nurses act to govern and construct the specialty. Exemplars are drawn from extensive professional experience, from guidelines of professional operating room nursing associations, as well as published texts. The focus is predominantly on the regulation of space and time to maintain the integrity of the sterile surgical field and issues of management, as well as the use of the ethical concept of the 'surgical conscience'. This form of analysis provides a level and depth of inquiry that has rarely been undertaken in operating room nursing. As such, it has the potential to provide a much needed, different view of operation room nursing that can only help to strengthen its professional foundations and development.

  10. Use of 2,4-dinitrophenylhydrazine for the purification of technical isoprene from carbonyl compounds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuznetsova, Y.V.; Taranenko, S.A.; Mil'kina, T.N.

    1983-01-01

    Technical isoprene can be freed from carbonyl compounds by conversion into non-volatile derivatives - hydrazones, with subsequent liberation of the purified isoprene during re-evaporation. The reaction takes place at room temperature with a molar ratio of 2,4-dinitrophenylhydrazine/carbonyl compounds in the range 2-10 to 1. This method of purification may also be used in other situations where a hydrocarbon flow freed from aldehydes and ketones is required.

  11. Toolbox of assessment tools of technical skills in otolaryngology-head and neck surgery: A systematic review.

    PubMed

    Labbé, Mathilde; Young, Meredith; Nguyen, Lily H P

    2017-10-08

    To support the development of programs of assessment of technical skills in the operating room (OR), we systematically reviewed the literature to identify assessment tools specific to otolaryngology-head and neck surgery (OTL-HNS) core procedures and summarized their characteristics. We systematically searched Embase, MEDLINE, PubMed, and Cochrane to identify and report on assessment tools that can be used to assess residents' technical surgical skills in the operating room for OTL-HNS core procedures. Of the 736 unique titles retrieved, 16 articles met inclusion criteria, covering 11 different procedures (in otology, rhinology, laryngology, head and neck, and general otolaryngology). The tools were composed of a task-specific checklist and/or global rating scale and were developed in the OR, on human cadavers, or in a simulation setting. Our study reports on published tools for assessing technical skills for OTL-HNS residents during core procedures conducted in the OR. These assessment tools could facilitate the provision of timely feedback to trainees including specific goals for improvement. However, the paucity of publications suggests little agreement on how to best perform work-based direct-observation assessment for core surgical procedures in OTL-HNS. The sparsity of tools specific to OTL-HNS may become a barrier to a fluid transition to competency-based medical education. Laryngoscope, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.

  12. [Chemical risk in operating rooms and technical progress: the obligations and responsibilities of law].

    PubMed

    Oddo, Antonio

    2013-01-01

    We are going to consider the specific applications of the new legal system and of the most recent body of laws to those work environments of particular risk, such as healthcare facilities and in particular operating rooms. In such environments, volatile chemicals classified as "dangerous" are used with consequent exposure to "chemical risk", both of those persons professionally involved, depending on the type of activity, and of the patients to whom such activities are addressed in the same environment. Once the chemical risk is framed in the existing regulatory system, it must be specifically evaluated the application of the same principle to the particular chemical risk arising from the use of anesthetic agents in the operating room, for example sevoflurane and desflurane, being careful to test wether and how much this risk can be eliminated or reduced to minimum in relation to the new achievements of the technical progress. So, as soon as the quality of "dangerous chemical agent" of the "volatile chemicals" and of the "volatile liquid anesthetic" (sevoflurane and desflurane) as well--which are characterized by a lower degree of toxicity and for this reason are mostly used in current chemical practice, preferable to some anesthetic gases such as nitrous oxide--is legally verified, it is necessary to relate the scientific and technical data which result from the current "state of art" also to the other binding regulations that are imposed for the "prevention and protection from chemical agents", according to the relative Title IX of the TUSL (Unique text for Safety and Health at Work).

  13. PBF Control Building (PER619). Interior of control room shows control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  14. Non-technical skills assessment in surgery.

    PubMed

    Sharma, Bharat; Mishra, Amit; Aggarwal, Rajesh; Grantcharov, Teodor P

    2011-09-01

    Adverse events in surgery have highlighted the importance of non-technical skills, such as communication, decision-making, teamwork, situational awareness and leadership, to effective organizational performance. These skills carry particular importance to surgical oncology, as members of a multidisciplinary team must work cohesively to formulate effective patient care plans. Several non-technical skills evaluation tools have been developed for use in surgery, without adequate comparison and consensus on which should be standard for training. Eleven articles describing the use of three non-technical evaluation tools related to surgery: NOTSS (Non Technical Skills for Surgeons), NOTECHS (Non Technical Skills) and OTAS (Observational Teamwork Assessment for Surgery) were analyzed with respect to scale formulation, validity, reliability and feasibility. Furthermore, their use in training thus far and the future of non-technical rating scales in surgical curricula was discussed. Future work should focus on incorporating these assessment tools into training and into a real operating room setting to provide formative evaluations for surgical residents. Copyright © 2010 Elsevier Ltd. All rights reserved.

  15. Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya; Joe, Jeffrey; Rice, Brandon

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.« less

  16. Indoor Chemical Exposures: Humans' Non-respiratory Interactions with Room Air

    ScienceCinema

    Charles Weschler

    2017-12-09

    March 18, 2010 Berkeley Lab Environmental Energy Technology Division distinguished lecture: The marked difference in pollutant concentrations between an occupied and un-occupied room are only partially explained by human bio-effluents. Humans alter levels of ozone and related oxidants such as nitrate and hydroxyl radicals in the rooms they inhabit; in effect, they change the oxidative capacity of room air. Ozone-initiated reactions on exposed skin, hair and clothing generate products, including potentially irritating chemicals whose concentrations are much higher in the occupant's breathing zone than in the core of the room. Charles J. Weschler is a Professor at the School of Public Health, the Department of Environmental and Occupational Medicine and the Environmental and Occupational Health Sciences Institute (EOHSI) at the University of Medicine and Dentistry of New Jersey (UMDNJ)/Robert Wood Johnson Medical School & Rutgers University (New Jersey). He is also a Visiting Professor at the International Centre for Indoor Environment and Energy, Technical University of Denmark (DTU, Lyngby, Denmark).

  17. ALF: a facility for x-ray lithography II--a progress report

    NASA Astrophysics Data System (ADS)

    Lesoine, L. G.; Kukkonen, Kenneth W.; Leavey, Jeffrey A.

    1992-07-01

    In our previous paper which we presented here two years ago, we described the ALF (Advanced Lithography Facility), IBM's new facility for X-ray lithography which was built as an addition to the Advanced Semiconductor Technology Center at IBM's semiconductor plant in Hopewell Jct., NY. At that time, we described the structure, its utilities, facilities and special features such as the radiation shielding, control room, clean room and vibration resistant design. The building has been completed and occupied. By the time this paper is presented the storage ring will be commissioned, the clean room occupied, and two beamlines with one stepper operational. In this paper we will review the successful completion of the facility with its associated hardware. The installation of the synchrotron will be described elsewhere. We will also discuss the first measurements of vibration, clean room cleanliness and the effectiveness of the radiation shielding. The ALF was completed on schedule and cost objectives were met. This is attributed to careful planning, close cooperation among all the parties involved from the technical team in IBM Research, the system vendor (Oxford Instruments of Oxford England) to the many contractors and subcontractors and to strong support from IBM senior management. All the planned building specifications were met and the facility has come on-line with a minimum of problems. Most important, the initial measurements show that the radiation shielding plan is sound and that with a few modifications the dose limit of 10% of background will be met. Any concerns about an electron accelerator and synchrotron in an industrial setting have been eliminated.

  18. 6. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHEAST CORNER - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  19. Quality aspects of digital radiography in general dental practice.

    PubMed

    Hellén-Halme, Kristina

    2007-01-01

    The number of dentists who have converted from conventional film radiography to digital radiography continues to grow. A digital system has numerous advantages, but there are also many new aspects to consider. The overall aim of this thesis was to study how digital radiography was used in general dental practices. The specific aims were to study how different factors affected image quality. To determine whether there were any differences in image quality between conventional film radiographs and digital radiographs, 4863 images (540 cases) were evaluated. The cases had been sent to the Swedish Dental Insurance Office for prior treatment approval. The image quality of digital radiographs was found to be significantly lower than that of film radiographs. This result led to a questionnaire study of dentists experienced in digital radiography. In 2003, a questionnaire was sent to the 139 general practice dentists who worked with digital radiography in Skine, Sweden; the response rate was 94%. Many general practice dentists had experienced several problems (65%), and less than half of the digital systems (40%) underwent some kind of quality control. One of the weaker links in the technical chain of digital radiography appeared to be the monitor. A field study to 19 dentists at their clinics found that the brightness and contrast settings of the monitors had to be adjusted to obtain the subjectively best image quality. The ambient light in the evaluation room was also found to affect the diagnostic outcome of low-contrast patterns in radiographs. To evaluate the effects of ambient light and technical adjustments of the monitor, a study using standardised set-ups was designed. Seven observers evaluated radiographs of 100 extracted human teeth for approximal caries under five different combinations of brightness and contrast settings on two different occasions with high and low ambient light levels in the evaluation room. The ability to diagnose carious lesions was found to be significantly better in a room with lower ambient light and on a monitor with well-adjusted brightness and contrast values than in a room with bright light and on an unadjusted monitor. In conclusion, many problems with dental digital radiography were identified. Knowledge of digital techniques and how to optimise each link in the system to maintain high radiographic quality at all times must be improved.

  20. Cleaning Hospital Room Surfaces to Prevent Health Care-Associated Infections: A Technical Brief.

    PubMed

    Han, Jennifer H; Sullivan, Nancy; Leas, Brian F; Pegues, David A; Kaczmarek, Janice L; Umscheid, Craig A

    2015-10-20

    The cleaning of hard surfaces in hospital rooms is critical for reducing health care-associated infections. This review describes the evidence examining current methods of cleaning, disinfecting, and monitoring cleanliness of patient rooms, as well as contextual factors that may affect implementation and effectiveness. Key informants were interviewed, and a systematic search for publications since 1990 was done with the use of several bibliographic and gray literature resources. Studies examining surface contamination, colonization, or infection with Clostridium difficile, methicillin-resistant Staphylococcus aureus, or vancomycin-resistant enterococci were included. Eighty studies were identified-76 primary studies and 4 systematic reviews. Forty-nine studies examined cleaning methods, 14 evaluated monitoring strategies, and 17 addressed challenges or facilitators to implementation. Only 5 studies were randomized, controlled trials, and surface contamination was the most commonly assessed outcome. Comparative effectiveness studies of disinfecting methods and monitoring strategies were uncommon. Future research should evaluate and compare newly emerging strategies, such as self-disinfecting coatings for disinfecting and adenosine triphosphate and ultraviolet/fluorescent surface markers for monitoring. Studies should also assess patient-centered outcomes, such as infection, when possible. Other challenges include identifying high-touch surfaces that confer the greatest risk for pathogen transmission; developing standard thresholds for defining cleanliness; and using methods to adjust for confounders, such as hand hygiene, when examining the effect of disinfecting methods.

  1. Quantification of Marangoni flows and film morphology during solid film formation by inkjet printing

    NASA Astrophysics Data System (ADS)

    Ishizuka, Hirotaka; Fukai, Jun

    2018-01-01

    We visualized experimentally the internal flow inside inkjet droplets of polystyrene-anisole solution during solid film formation on substrates at room temperature. The effects of contact angle and evaporation rate on the internal flow and film morphology were quantitatively investigated. The transport process during film formation was examined by measuring the relationship between internal flow and film morphology, which provided three remarkable findings. First, self-pinning and the strength of outward flow on the free surface under 2.3 Pa s determined film morphology. The solute distribution, corresponding to rim areas in ring-like films and a convex trough in dot-like films, had already developed at self-pinning. Second, the mass fraction at self-pinning close to the contact line converged to one, regardless of the film morphology. This implies that self-pinning is independent of parameters such as the contact angle and evaporation rate. Third, at room temperature, the solutal Marangoni numbers were 20-30 times larger than the thermal ones. Thus, the outward flow on the free surface caused by the solutal Marangoni effect dominates in droplets before self-pinning. The solutal Marangoni number at self-pinning and thickness variation at the center of the film displayed a good relationship for droplets with different contact angles and evaporation rates. This suggests that film morphology can be technically controlled by solutal Marangoni number at room temperature.

  2. RADIOPROTECTION CAMPAIGN AND CARD: EDUCATIONAL STRATEGIES THAT REDUCE CHILDREN'S EXCESSIVE EXPOSURE TO RADIOLOGICAL EXAMS.

    PubMed

    Bernardo, Mônica Oliveira; Almeida, Fernando Antonio de; Morgado, Flavio

    2017-01-01

    To analyze the results of an initiative aimed at improving the reasonable use of radiological examinations, ensuring their technical quality, implementing a radioprotection campaign that includes training of the professional team, and introducing the radioprotection card for children under 12 years old as a tool for parents and doctors to control children's exposure to radiation. The study was held in a health care insurance system covering 140,000 people. A radioprotection campaign was implemented according to Image Gently • protocols, ensuring the lowest dose of radiation and the quality of examinations, and the radioprotection card was implemented. To assess the effectiveness of these actions, the number of radiological examinations performed at the pediatric emergency room in a period of one year preceding the campaign was compared with the number of radiological examinations performed one year after the campaign. The campaign was well accepted by all professionals, families, and patients involved. In the year following the implementation of radioprotection strategies, there was a 22% reduction of radiological examinations performed at the pediatric emergency room. There was also a 29% reduction in the request of two or more radiological examinations for the same child or examinations with two or more incidences. The campaign and the radioprotection card for children under 12 years old proved to be feasible strategies and correlated with a reduction in radiological examinations requested and performed at the pediatric emergency room.

  3. Numerical modeling of cold room's hinged door opening and closing processes

    NASA Astrophysics Data System (ADS)

    Carneiro, R.; Gaspar, P. D.; Silva, P. D.; Domingues, L. C.

    2016-06-01

    The need of rationalize energy consumption in agrifood industry has fasten the development of methodologies to improve the thermal and energy performances of cold rooms. This paper presents a three-dimensional (3D) transient Computational Fluid Dynamics (CFD) modelling of a cold room to evaluate the air infiltration rate through hinged doors. A species transport model is used for modelling the tracer gas concentration decay technique. Numerical predictions indicate that air temperature difference between spaces affects the air infiltration. For this case study, the infiltration rate increases 0.016 m3 s-1 per K of air temperature difference. The knowledge about the evolution of air infiltration during door opening/closing times allows to draw some conclusions about its influence on the air conditions inside the cold room, as well as to suggest best practices and simple technical improvements that can minimize air infiltration, and consequently improve thermal performance and energy consumption rationalization.

  4. PBF Control Building (PER619). Interior of control room. Control console ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  5. Study About Ceiling Design for Main Control Room of NPP with HFE

    NASA Astrophysics Data System (ADS)

    Gu, Pengfei; Ni, Ying; Chen, Weihua; Chen, Bo; Zhang, Jianbo; Liang, Huihui

    Recently since human factor engineering (HFE) has been used in control room design of nuclear power plant (NPP), the human-machine interface (HMI) has been gradual to develop harmoniously, especially the use of the digital technology. Comparing with the analog technology which was used to human-machine interface in the past, human-machine interaction has been more enhanced. HFE and the main control room (MCR) design engineering of NPP is a combination of multidisciplinary cross, mainly related to electrical and instrument control, reactor, machinery, systems engineering and management disciplines. However, MCR is not only equipped with HMI provided by the equipments, but also more important for the operator to provide a work environment, such as the main control room ceiling. The ceiling design of main control room related to HFE which influences the performance of staff should also be considered in the design of the environment and aesthetic factors, especially the introduction of professional design experience and evaluation method. Based on Ling Ao phase II and Hong Yanhe project implementation experience, the study analyzes lighting effect, space partition, vision load about the ceiling of main control room of NPP. Combining with the requirements of standards, the advantages and disadvantages of the main control room ceiling design has been discussed, and considering the requirements of lightweight, noise reduction, fire prevention, moisture protection, the ceiling design solution of the main control room also has been discussed.

  6. Multidisciplinary team simulation for the operating theatre: a review of the literature.

    PubMed

    Tan, Shaw Boon; Pena, Guilherme; Altree, Meryl; Maddern, Guy J

    2014-01-01

    Analyses of adverse events inside the operating theatre has demonstrated that many errors are caused by failure in non-technical skills and teamwork. While simulation has been used successfully for teaching and improving technical skills, more recently, multidisciplinary simulation has been used for training team skills. We hypothesized that this type of training is feasible and improves team skills in the operating theatre. A systematic search of the literature for studies describing true multidisciplinary operating theatre team simulation was conducted in November and December 2012. We looked at the characteristics and outcomes of the team simulation programmes. 1636 articles were initially retrieved. Utilizing a stepwise evaluation process, 26 articles were included in the review. The studies reveal that multidisciplinary operating theatre simulation has been used to provide training in technical and non-technical skills, to help implement new techniques and technologies, and to identify latent weaknesses within a health system. Most of the studies included are descriptions of training programmes with a low level of evidence. No randomized control trial was identified. Participants' reactions to the training programme were positive in all studies; however, none of them could objectively demonstrate that skills acquired from simulation are transferred to the operating theatre or show a demonstrable benefit in patient outcomes. Multidisciplinary operating room team simulation is feasible and widely accepted by participants. More studies are required to assess the impact of this type of training on operative performance and patient safety. © 2013 Royal Australasian College of Surgeons.

  7. The features of infectious diseases departments and anti-infective practices in France and Turkey: a cross-sectional study.

    PubMed

    Erdem, H; Stahl, J P; Inan, A; Kilic, S; Akova, M; Rioux, C; Pierre, I; Canestri, A; Haustraete, E; Engin, D O; Parlak, E; Argemi, X; Bruley, D; Alp, E; Greffe, S; Hosoglu, S; Patrat-Delon, S; Heper, Y; Tasbakan, M; Corbin, V; Hopoglu, M; Balkan, I I; Mutlu, B; Demonchy, E; Yilmaz, H; Fourcade, C; Toko-Tchuindzie, L; Kaya, S; Engin, A; Yalci, A; Bernigaud, C; Vahaboglu, H; Curlier, E; Akduman, D; Barrelet, A; Oncu, S; Korten, V; Usluer, G; Turgut, H; Sener, A; Evirgen, O; Elaldi, N; Gorenek, L

    2014-09-01

    The aim of this study was to assess the infectious diseases (ID) wards of tertiary hospitals in France and Turkey for technical capacity, infection control, characteristics of patients, infections, infecting organisms, and therapeutic approaches. This cross-sectional study was carried out on a single day on one of the weekdays of June 17-21, 2013. Overall, 36 ID departments from Turkey (n = 21) and France (n = 15) were involved. On the study day, 273 patients were hospitalized in Turkish and 324 patients were followed in French ID departments. The numbers of patients and beds in the hospitals, and presence of an intensive care unit (ICU) room in the ID ward was not different in both France and Turkey. Bed occupancy in the ID ward, single rooms, and negative pressure rooms were significantly higher in France. The presence of a laboratory inside the ID ward was more common in Turkish ID wards. The configuration of infection control committees, and their qualifications and surveillance types were quite similar in both countries. Although differences existed based on epidemiology, the distribution of infections were uniform on both sides. In Turkey, anti-Gram-positive agents, carbapenems, and tigecycline, and in France, cephalosporins, penicillins, aminoglycosides, and metronidazole were more frequently preferred. Enteric Gram-negatives and hepatitis B and C were more frequent in Turkey, while human immunodeficiency virus (HIV) and streptococci were more common in France (p < 0.05 for all significances). Various differences and similarities existed in France and Turkey in the ID wards. However, the current scene is that ID are managed with high standards in both countries.

  8. KSC-2012-6402

    NASA Image and Video Library

    2012-11-16

    CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  9. KSC-2012-6401

    NASA Image and Video Library

    2012-11-16

    CAPE CANAVERAL, Fla. – Firing Room 1, also known as the Young-Crippen Firing Room, has been outfitted with computer, communications and networking systems to host rockets and spacecraft that are currently under development. The firing room is where the launch of rockets and spacecraft are controlled at NASA's Kennedy Space Center in Florida. Flight controllers also monitor processing and preparations of launch vehicles from the firing room. There are four firing rooms inside the Launch Control Center at Kennedy. Photo credit: NASA/Dmitri Gerondidakis

  10. [An investigation of the application of hygienic standards for the design of industrial enterprises (GBZ 1-2010)].

    PubMed

    Lu, Y; Zhang, M

    2016-08-20

    Objective: To study the applicability, the high frequency used content, the feasibility, and issues needed to be solved of the standard of GBZ 1-2010, aiming to provide technical evidence for the revision of GBZ1. Methods: In the study, the data were collected by referring to the literature database and the questionnaire from June 2013 to June 2015. There were 2 surveys carried out in the study, with methods including questionnaire survey and specific interview. The investigation methods include the paper version of the questionnaire by mail, the electronic version of the questionnaire by e-mail, and the online survey. And 111 questionnaires were collected. Results: In total, the applicability survey (the first survey) received 156 suggestions covering 76 items from 23 facilities, and 13 key technical issues were summarized to be solved as priorities. In the application survey (the second survey) , the leading three jobs using GBZ 1-2010 were the occupational hazards evaluation for constructive project (82.0%) , lecturing/training (65.8%) , occupational hazards monitoring (64.9%) , respectively. The high frequency used contents of GBZ 1-2010 were the sixth part "the basic hygienic requirements for workplace" (90.1%) , the fifth part "site selection, overall layout and workshop design" (87.4%) , the seventh part "the basic hygienic requirements for welfare room" (85.6%) , respectively. In the results of feasibility, scores of the fourth part "the general rules" , the fifth part "site selection, overall layout and workshop design" , the sixth part "the basic hygienic requirements for workplace" , the seventh part "the basic hygienic requirements for welfare room" , the eighth "emergency rescue" , annex A "the correct use instructions" , annex B "buffer zone standards for industrial enterprises" were 2.6, 3.1, 3.5, 3.8, 3.2, 3.3, 2.6, respectively. Among 111 questionnaires, the parts needed to be modified as priories were the fifth part "site selection, overall layout and workshop design" (51.4%) , and the sixth part "the basic hygienic requirements for workplace" (51.4%) . In results of the key technical issues needed to be modified of GBZ 1-2010, the contents needed to be added as priories were the occupational prevention and control requirements of biological factors (51.4%) , technical parameters of dust in workplace (48.7%) , technical parameters of hazardous agents in workplace (46.9%) , the quality and quantity requirements of fresh air (46.0%) , the setting conditions of the emergency rescue station (46.0%) , the hygienic design requirements of joint workshops and the evidence (45.1%) , and requirements for medical emergency rescue personnel equipped and qualified (45.1%) . Conclusion: GBZ 1-2010 is feasible and practical, mainly used by occupational health technical service organizations in the occupational hazards evaluation for constructive project, lecturing/training, occupational hazards monitoring, et al. GBZ 1 plays a directive role in government decision-making, control of constructive projects from the beginning, training and capacity building of occupational health professionals, and the prevention and treatment of occupational diseases in enterprises, needing to strengthen the implementation of GBZ 1. And on the basis of the above key technical issues to be revised, international cooperation and exchanges should be strengthened, so that it is adapted to the development of the modern enterprise system.

  11. Bio-Kil, a nano-based disinfectant, reduces environmental bacterial burden and multidrug-resistant organisms in intensive care units.

    PubMed

    Lee, Wen-Sen; Hsieh, Tai-Chin; Shiau, Justine C; Ou, Tsong-Yih; Chen, Fu-Lun; Liu, Yu-Hsin; Yen, Muh-Yong; Hsueh, Po-Ren

    2017-10-01

    This prospective before-after study was intended to investigate the effect of Bio-Kil on reducing environmental bacterial burden and healthcare-associated infections (HAIs) in intensive care units (ICUs) at the Municipal Wan-Fang Hospital, Taipei, Taiwan in 2014. Four rooms in the medical and surgical ICUs were investigated and designated as study rooms (n = 2) or control rooms (n = 2). Routine disinfection was performed during the pre-intervention period in both room types. Bio-Kil was applied to the fomites and surroundings of the study rooms during the intervention period. Total bacterial burden and proportion of colonization of fomites and surroundings by multidrug-resistance organisms (MDROs) were determined before and after the intervention. The demographic characteristics, underlying conditions, and clinical outcomes of patients were analyzed. After application of Bio-Kil, the bacterial burden declined in both groups, although the reduction was greater in the study rooms as compared with the control rooms (p = 0.001). During the pre-intervention period, 16 patients were admitted to control rooms and 18 patients to study rooms. After the intervention, 22 patients were admitted to control rooms and 21 patients to study rooms. The number of cases of new-onset sepsis declined in the intervention group (from 33% to 23.8%), but increased in the control group (from 25% to 40.9%); however, there was no significant difference in incidence of new-onset sepsis between the study and control rooms after intervention. Application of Bio-Kil reduced the environmental bacterial burden and MDROs in ICUs. Further studies are needed to evaluate the efficacy of this nanotechnology-based disinfectant in reducing HAIs. Copyright © 2016. Published by Elsevier B.V.

  12. 78 FR 12042 - Electric Grid Integration Technical Workshops

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    .... The documents are the Electricity Distribution System Workshop Discussion Summary and the Electricity... FURTHER INFORMATION CONTACT: Caitlin A. Callaghan, National Electricity Delivery Division, Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy, Forrestal Building, Room 8E-032, 1000...

  13. Technical and Occupational Shops. Volume II.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    The layouts and specifications provided are intended as a guide to school boards, educators, and architects. Drawings and room plans illustrate specifications for girls' occupational shop, graphic arts, carpentry (millwork and building construction shop), boys' occupational shop (mechanical), boys' occupational shop (building construction),…

  14. Treatment. Technical Assistance Packet.

    ERIC Educational Resources Information Center

    Join Together, Boston, MA.

    Treatment is one component of a strategy to reduce substance abuse. It can include detoxification; inpatient counseling; outpatient counseling; therapeutic communities; and self help groups. Referrals can take place in settings such as emergency rooms; employee assistance programs; churches; and physicians' offices. Unmet treatment needs can cause…

  15. 16 CFR 1406.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... BURNING APPLIANCES-NOTIFICATION OF PERFORMANCE AND TECHNICAL DATA § 1406.3 Definitions. For the purposes of this rule: (a) Coal and wood burning appliances means fireplace stoves, room heater/fireplace... chimney flue. (e) Cookstoves and ranges are chimney connected solid fuel burning appliances that are used...

  16. 16 CFR 1406.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... BURNING APPLIANCES-NOTIFICATION OF PERFORMANCE AND TECHNICAL DATA § 1406.3 Definitions. For the purposes of this rule: (a) Coal and wood burning appliances means fireplace stoves, room heater/fireplace... chimney flue. (e) Cookstoves and ranges are chimney connected solid fuel burning appliances that are used...

  17. Adaptation of non-technical skills behavioural markers for delivery room simulation.

    PubMed

    Bracco, Fabrizio; Masini, Michele; De Tonetti, Gabriele; Brogioni, Francesca; Amidani, Arianna; Monichino, Sara; Maltoni, Alessandra; Dato, Andrea; Grattarola, Claudia; Cordone, Massimo; Torre, Giancarlo; Launo, Claudio; Chiorri, Carlo; Celleno, Danilo

    2017-03-17

    Simulation in healthcare has proved to be a useful method in improving skills and increasing the safety of clinical operations. The debriefing session, after the simulated scenario, is the core of the simulation, since it allows participants to integrate the experience with the theoretical frameworks and the procedural guidelines. There is consistent evidence for the relevance of non-technical skills (NTS) for the safe and efficient accomplishment of operations. However, the observation, assessment and feedback on these skills is particularly complex, because the process needs expert observers and the feedback is often provided in judgmental and ineffective ways. The aim of this study was therefore to develop and test a set of observation and rating forms for the NTS behavioural markers of multi-professional teams involved in delivery room emergency simulations (MINTS-DR, Multi-professional Inventory for Non-Technical Skills in the Delivery Room). The MINTS-DR was developed by adapting the existing tools and, when needed, by designing new tools according to the literature. We followed a bottom-up process accompanied by interviews and co-design between practitioners and psychology experts. The forms were specific for anaesthetists, gynaecologists, nurses/midwives, assistants, plus a global team assessment tool. We administered the tools in five editions of a simulation training course that involved 48 practitioners. Ratings on usability and usefulness were collected. The mean ratings of the usability and usefulness of the tools were not statistically different to or higher than 4 on a 5-point rating scale. In either case no significant differences were found across professional categories. The MINTS-DR is quick and easy to administer. It is judged to be a useful asset in maximising the learning experience that is provided by the simulation.

  18. First-year Analysis of the Operating Room Black Box Study.

    PubMed

    Jung, James J; Jüni, Peter; Lebovic, Gerald; Grantcharov, Teodor

    2018-06-18

    To characterize intraoperative errors, events, and distractions, and measure technical skills of surgeons in minimally invasive surgery practice. Adverse events in the operating room (OR) are common contributors of morbidity and mortality in surgical patients. Adverse events often occur due to deviations in performance and environmental factors. Although comprehensive intraoperative data analysis and transparent disclosure have been advocated to better understand how to improve surgical safety, they have rarely been done. We conducted a prospective cohort study in 132 consecutive patients undergoing elective laparoscopic general surgery at an academic hospital during the first year after the definite implementation of a multiport data capture system called the OR Black Box to identify intraoperative errors, events, and distractions. Expert analysts characterized intraoperative distractions, errors, and events, and measured trainee involvement as main operator. Technical skills were compared, crude and risk-adjusted, among the attending surgeon and trainees. Auditory distractions occurred a median of 138 times per case [interquartile range (IQR) 96-190]. At least 1 cognitive distraction appeared in 84 cases (64%). Medians of 20 errors (IQR 14-36) and 8 events (IQR 4-12) were identified per case. Both errors and events occurred often in dissection and reconstruction phases of operation. Technical skills of residents were lower than those of the attending surgeon (P = 0.015). During elective laparoscopic operations, frequent intraoperative errors and events, variation in surgeons' technical skills, and a high amount of environmental distractions were identified using the OR Black Box.

  19. Play to become a surgeon: impact of Nintendo Wii training on laparoscopic skills.

    PubMed

    Giannotti, Domenico; Patrizi, Gregorio; Di Rocco, Giorgio; Vestri, Anna Rita; Semproni, Camilla Proietti; Fiengo, Leslie; Pontone, Stefano; Palazzini, Giorgio; Redler, Adriano

    2013-01-01

    Video-games have become an integral part of the new multimedia culture. Several studies assessed video-gaming enhancement of spatial attention and eye-hand coordination. Considering the technical difficulty of laparoscopic procedures, legal issues and time limitations, the validation of appropriate training even outside of the operating rooms is ongoing. We investigated the influence of a four-week structured Nintendo® Wii™ training on laparoscopic skills by analyzing performance metrics with a validated simulator (Lap Mentor™, Simbionix™). We performed a prospective randomized study on 42 post-graduate I-II year residents in General, Vascular and Endoscopic Surgery. All participants were tested on a validated laparoscopic simulator and then randomized to group 1 (Controls, no training with the Nintendo® Wii™), and group 2 (training with the Nintendo® Wii™) with 21 subjects in each group, according to a computer-generated list. After four weeks, all residents underwent a testing session on the laparoscopic simulator of the same tasks as in the first session. All 42 subjects in both groups improved significantly from session 1 to session 2. Compared to controls, the Wii group showed a significant improvement in performance (p<0.05) for 13 of the 16 considered performance metrics. The Nintendo® Wii™ might be helpful, inexpensive and entertaining part of the training of young laparoscopists, in addition to a standard surgical education based on simulators and the operating room.

  20. 16 CFR § 1406.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... BURNING APPLIANCES-NOTIFICATION OF PERFORMANCE AND TECHNICAL DATA § 1406.3 Definitions. For the purposes of this rule: (a) Coal and wood burning appliances means fireplace stoves, room heater/fireplace... chimney flue. (e) Cookstoves and ranges are chimney connected solid fuel burning appliances that are used...

  1. Main Control Room, view to the east. The door to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Main Control Room, view to the east. The door to the motor room is to the right, and the main control cabinets are to the left - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  2. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  3. Medical Surveillance Monthly Report (MSMR). Volume 1, Number 8, November 1995

    DTIC Science & Technology

    1995-11-01

    hemorrhagic fever, and dengue-like arboviral syndromes. In Current Therapy of Infectious Diseases, D. Schlossberg (ed.), in press. 6. Technical Advisory...cath- eterization. The following day she was returned to the operating room for a myofascial biopsy and fasciotomy of the right posterior thigh

  4. 78 FR 65426 - Technical Report: Evaluation of the Certified-Advanced Air Bags

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... INFORMATION CONTACT: Nathan K. Greenwell, Mathematical Statistician, Evaluation Division, NVS-431, National Center for Statistics and Analysis, National Highway Traffic Safety Administration, Room W53-438, 1200... bags at all for children, using occupant detection sensors to suppress the air bags. Statistical...

  5. DISTRIBUTION OF PCB 84 ENANTIOMERS IN C56BL/6 MICE

    EPA Science Inventory

    At room temperature, nineteen of the 209 possible PCB congeners exist as pairs of stable rotational isomers that are enantiomeric to each other. A racemic mixture of each of these PCB atropisomers is present in technical mixtures, thus raising concerns about enantioselective dis...

  6. Reading Room: Today's Libraries Are Bustling Centers of Learning.

    ERIC Educational Resources Information Center

    Black, Susan

    2001-01-01

    School libraries are changing. Since 1988, Library Power, a $40 million program sponsored by the DeWitt Wallace Reader's Digest fund, has helped 700 elementary- and middle-school libraries in 19 communities improve collections, refurbish facilities, develop curriculum, and provide technical training for school personnel. (MLH)

  7. Knowledge Engineering (Or, Catching Black Cats in Dark Rooms).

    ERIC Educational Resources Information Center

    Ruyle, Kim E.

    1993-01-01

    Discusses knowledge engineering, its relationship to artificial intelligence, and possible applications to developing expert systems, job aids, and technical training. The educational background of knowledge engineers is considered; the role of subject matter experts is described; and examples of flow charts, lists, and pictorial representations…

  8. Developments for the Automation and Remote Control of the Radio Telescopes of the Geodetic Observatory Wettzell

    NASA Astrophysics Data System (ADS)

    Neidhardt, Alexander; Schönberger, Matthias; Plötz, Christian; Kronschnabl, Gerhard

    2014-12-01

    VGOS is a challenge for all fields of a new radio telescope. For the future software and hardware control mechanisms, it also requires new developments and solutions. More experiments, more data, high-speed data transfers through the Internet, and a real-time monitoring of current system status information must be handled. Additionally, an optimization of the observation shifts is required to reduce work load and costs. Within the framework of the development of the new 13.2-m Twin radio Telescopes Wettzell (TTW) and in combination with upgrades of the 20-m Radio Telescope Wettzell (RTW), some new technical realizations are under development and testing. Besides the activities for the realization of remote control, mainly supported during the project ``Novel EXploration Pushing Robust e-VLBI Services (NEXPReS)'' of the European VLBI Network (EVN), autonomous, automated, and unattended observations are also planned. A basic infrastructure should enable these, e.g., independent monitoring and security systems or additional, local high-speed transfer networks to ship data directly from a telescope to the main control room.

  9. Approaches to decrease the level of parasitic noise over vibroacoustic channel in terms of configuring information security tools

    NASA Astrophysics Data System (ADS)

    Ivanov, A. V.; Reva, I. L.; Babin, A. A.

    2018-04-01

    The article deals with influence of various ways to place vibration transmitters on efficiency of rooms safety for negotiations. Standing for remote vibration listening of window glass, electro-optical channel, the most typical technical channel of information leakage, was investigated. The modern system “Sonata-AB” of 4B model is used as an active protection tool. Factors influencing on security tools configuration efficiency have been determined. The results allow utilizer to reduce masking interference level as well as parasitic noise with keeping properties of room safety.

  10. Maximum performance synergy: A new approach to recording studio control room design

    NASA Astrophysics Data System (ADS)

    Szymanski, Jeff D.

    2003-10-01

    Popular recording studio control room designs include LEDE(tm), RFZ(tm), and nonenvironment rooms. The common goal of all of these is to create an accurate acoustical environment that does not distort or otherwise color audio reproduction. Also common to these designs is the frequent need to have multiple ancillary recording rooms, often adjacent to the main control room, where group members perform. This approach, where group members are physically separated from one another, can lead to lack of ensemble in the finished recordings. New twists on old acoustical treatment techniques have been implemented at a studio in Nashville, Tennessee, which minimize the need for multiple ancillary recording rooms, thus creating an environment where talent, producer and recording professionals can all occupy the same space for maximum performance synergy. Semi-separated performance areas are designed around a central, critical listening area. The techniques and equipment required to achieve this separation are reviewed, as are advantages and disadvantages to this new control room design approach.

  11. 5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1A, DIRECTORATE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1-A, DIRECTORATE OF MISSILE CAPTIVE TEST, EDWARDS AFB, 15 JAN 58, 3097.58." Two men working in the control room. Photo no. "3097 58; G-AFFTC 15 JAN 58, T.S. 1-A Control". - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA

  12. [Exposure of schoolchildren and teachers to noise at school].

    PubMed

    Koszarny, Z; Goryński, P

    1990-01-01

    The factor of decisive influence on the acoustic climate in rooms is the inner noise, which is dependent in schools on the activity of children, overcrowding of classes and inadequate use of technical protective means. The inappropriate location of schools, although also important from the standpoint of acoustics, is a much lower source of noise than it is generally assumed. Particularly unfavourable acoustic conditions are in elementary schools with over 300 children in one shift. The spaces with the highest noise level include corridors, especially during recesses between lessons. The noise level in them is in the range of an equivalent sound A 60-95 dB, and the most frequent noise level is 80 dB. In a large part of schools the acoustic conditions in the corridors during recesses approach the critical values accepted for hearing protection in industrial plants, in some schools they are even exceeded. The situation is also unfavourable in other rooms such as doctor's office, director's room, reading rooms, rooms for teachers. These rooms are situated usually without taking into consideration of the acoustic conditions. This is particularly true of teachers' rooms which should give the teachers the possibility of resting before the next lesson. During lessons the noise level decreases in all rooms. However, the noisiest among them, corridors, classes situated near the hall for physical exercises and day-room, have still up to about 65 dB noise level. Generally speaking, in about 60% of rooms the acoustic conditions are below the recommended standard. The main cause, apart from overcrowding of schools, is low acoustic absorption ability of school rooms, and poor acoustic insulation ability of the doors in schools.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Charles Weschler

    March 18, 2010 Berkeley Lab Environmental Energy Technology Division distinguished lecture: The marked difference in pollutant concentrations between an occupied and un-occupied room are only partially explained by human bio-effluents. Humans alter levels of ozone and related oxidants such as nitrate and hydroxyl radicals in the rooms they inhabit; in effect, they change the oxidative capacity of room air. Ozone-initiated reactions on exposed skin, hair and clothing generate products, including potentially irritating chemicals whose concentrations are much higher in the occupant's breathing zone than in the core of the room. Charles J. Weschler is a Professor at the School ofmore » Public Health, the Department of Environmental and Occupational Medicine and the Environmental and Occupational Health Sciences Institute (EOHSI) at the University of Medicine and Dentistry of New Jersey (UMDNJ)/Robert Wood Johnson Medical School & Rutgers University (New Jersey). He is also a Visiting Professor at the International Centre for Indoor Environment and Energy, Technical University of Denmark (DTU, Lyngby, Denmark).« less

  14. Control Room Training for the Hyper-X Project Utilizing Aircraft Simulation

    NASA Technical Reports Server (NTRS)

    Lux-Baumann, Jesica; Dees, Ray; Fratello, David

    2006-01-01

    The NASA Dryden Flight Research Center flew two Hyper-X research vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This report describes the technology in the simulation environment and the Mission Control Center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

  15. Control Room Training for the Hyper-X Program Utilizing Aircraft Simulation

    NASA Technical Reports Server (NTRS)

    Lux-Baumann, Jessica R.; Dees, Ray A.; Fratello, David J.

    2006-01-01

    The NASA Dryden Flight Research Center flew two Hyper-X Research Vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions, personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This paper describes the technology in the simulation environment and the mission control center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

  16. Effectiveness of Virtual Reality Training in Orthopaedic Surgery.

    PubMed

    Aïm, Florence; Lonjon, Guillaume; Hannouche, Didier; Nizard, Rémy

    2016-01-01

    The purpose of this study was to conduct a systematic review to determine the effectiveness of virtual reality (VR) training in orthopaedic surgery. A comprehensive systematic review was performed of articles of VR training in orthopaedic surgery published up to November 2014 from MEDLINE, EMBASE, and the Cochrane Central Register of Controlled Trials databases. We included 10 relevant trials of 91 identified articles, which all reported on training in arthroscopic surgery (shoulder, n = 5; knee, n = 4; undefined, n = 1). A total of 303 participants were involved. Assessment after training was made on a simulator in 9 of the 10 studies, and in one study it took place in the operating room (OR) on a real patient. A total of 32 different outcomes were extracted; 29 of them were about skills assessment. None involved a patient-related outcome. One study focused on anatomic learning, and the other evaluated technical task performance before and after training on a VR simulator. Five studies established construct validity. Three studies reported a statistically significant improvement in technical skills after training on a VR simulator. VR training leads to an improvement of technical skills in orthopaedic surgery. Before its widespread use, additional trials are needed to clarify the transfer of VR training to the OR. Systematic review of Level I through Level IV studies. Copyright © 2016 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  17. Main control room, showing original sixpane windows and doors to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Main control room, showing original six-pane windows and doors to pump motor room at left. The main control cabinets and switchgear, visible on right, were replaced in 2003. View to the south - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ

  18. VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0’, LOOKING WEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0’, LOOKING WEST. THESE PANELS WERE WHERE THE A-MOTOR TAPES WOULD HAVE BEEN VISIBLE IN THE CONTROL ROOM. MORE RECENT MONITOR IN UPPER CENTER FOR “LTR FLUX MONITORS” - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  19. Gaze training enhances laparoscopic technical skill acquisition and multi-tasking performance: a randomized, controlled study.

    PubMed

    Wilson, Mark R; Vine, Samuel J; Bright, Elizabeth; Masters, Rich S W; Defriend, David; McGrath, John S

    2011-12-01

    The operating room environment is replete with stressors and distractions that increase the attention demands of what are already complex psychomotor procedures. Contemporary research in other fields (e.g., sport) has revealed that gaze training interventions may support the development of robust movement skills. This current study was designed to examine the utility of gaze training for technical laparoscopic skills and to test performance under multitasking conditions. Thirty medical trainees with no laparoscopic experience were divided randomly into one of three treatment groups: gaze trained (GAZE), movement trained (MOVE), and discovery learning/control (DISCOVERY). Participants were fitted with a Mobile Eye gaze registration system, which measures eye-line of gaze at 25 Hz. Training consisted of ten repetitions of the "eye-hand coordination" task from the LAP Mentor VR laparoscopic surgical simulator while receiving instruction and video feedback (specific to each treatment condition). After training, all participants completed a control test (designed to assess learning) and a multitasking transfer test, in which they completed the procedure while performing a concurrent tone counting task. Not only did the GAZE group learn more quickly than the MOVE and DISCOVERY groups (faster completion times in the control test), but the performance difference was even more pronounced when multitasking. Differences in gaze control (target locking fixations), rather than tool movement measures (tool path length), underpinned this performance advantage for GAZE training. These results suggest that although the GAZE intervention focused on training gaze behavior only, there were indirect benefits for movement behaviors and performance efficiency. Additionally, focusing on a single external target when learning, rather than on complex movement patterns, may have freed-up attentional resources that could be applied to concurrent cognitive tasks.

  20. 76 FR 323 - Information Systems Technical Advisory Committee; Notice of Partially Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ...), Building 33, Cloud Room, 53560 Hull Street, San Diego, California 92152. The Committee advises the Office... and Relation to Category 3 5. Godson Microprocessor Project 6. Autonomous Vehicle Project 7. Cloud Computing, Technology and Security Issues Thursday, January 27 Closed Session 8. Discussion of matters...

  1. 75 FR 12989 - Hazardous Waste Technical Corrections and Clarifications Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... regulations that relate to hazardous waste identification, manifesting, the hazardous waste generator..., NW., Washington, DC 20460. Attention Docket ID No. EPA-HQ-RCRA-2008-0678. Please include a total of 2 copies. Hand Delivery: EPA West Building, Room 3334, 1301 Constitution Ave., NW., Washington, DC. Such...

  2. 78 FR 65303 - Request for Information To Inform the Title III Technical Assistance Agenda and the Future...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... for English Language Acquisition (NCELA) AGENCY: Office of English Language Acquisition, Language... of English Language Acquisition, 400 Maryland Avenue SW., Room 5C148, Washington, DC 20202- 6132... assistance, including materials through the National Clearinghouse for English Language Acquisition and...

  3. 76 FR 11845 - Notice of Intent To Review Structure of the Aviation Rulemaking Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Management Facility at 202-493-2251. Hand Delivery: Bring comments to the Docket Management Facility in Room... technical subject areas (presently, air carrier operations, maintenance, occupant safety, general aviation...: Renee Butner, Office of Rulemaking, ARM-24, Federal Aviation Administration, 800 Independence Ave., SW...

  4. Swimming Pools.

    ERIC Educational Resources Information Center

    Ministry of Housing and Local Government, London (England).

    Technical and engineering data are set forth on the design and construction of swimming pools. Consideration is given to site selection, pool construction, the comparative merits of combining open air and enclosed pools, and alternative uses of the pool. Guidelines are presented regarding--(1) pool size and use, (2) locker and changing rooms, (3)…

  5. 24 CFR 3280.4 - Incorporation by reference.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Floor, Arlington, VA 22209-2403 ASCE—American Society of Civil Engineers, 345 East 47th Street, New York... 47th Street, New York, New York 10017 ASSE—American Society of Sanitary Engineering, P.O. Box 40362... of Engineering Standards, room A-166, Technical Building, Washington, DC 20234 FS—Federal...

  6. 47 CFR 76.2000 - Exclusive access to multiple dwelling units generally.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... time share units, academic campuses and dormitories, military bases, hotels, rooming houses, prisons..., Receiver-generated, Responsibility 76.617 Isolation, Terminal 76.5 J-L Leakage measurements, Signal 76.601... noise 76.5 T Technical standards 76.605 Terminal isolation 76.5 Terminal, Subscriber 76.5 Tests...

  7. 47 CFR 76.2000 - Exclusive access to multiple dwelling units generally.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... time share units, academic campuses and dormitories, military bases, hotels, rooming houses, prisons..., Receiver-generated, Responsibility 76.617 Isolation, Terminal 76.5 J-L Leakage measurements, Signal 76.601... noise 76.5 T Technical standards 76.605 Terminal isolation 76.5 Terminal, Subscriber 76.5 Tests...

  8. Making Room for Planners in FM

    ERIC Educational Resources Information Center

    Drummond, Victoria C.

    2012-01-01

    Not long ago universities, colleges, and schools identified the management of facilities as the Physical Plant Office. Albeit, the services provided by the physical plant office included complex and highly technical functions, they were mainly focused on keeping building systems operating and the campus looking good. As important as these…

  9. 78 FR 14517 - Agency Information Collection Activities; Comment Request; Technical Assistance To Promote the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... DEPARTMENT OF EDUCATION [Docket No. ED-2013-ICCD-0025] Agency Information Collection Activities...-School Youth AGENCY: Office of Elementary and Secondary Education (OESE), Department of Education (ED.... Department of Education, 400 Maryland Avenue SW., LBJ, Room 2E117, Washington, DC 20202-4537. FOR FURTHER...

  10. 77 FR 38680 - NASA Advisory Council; Human Exploration and Operations Committee; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... persons, scientific and technical information relevant to program planning. DATES: Monday, July 23, 2012... Goddard Space Flight Center (GSFC), Building 1, Room E100D, 8800 Greenbelt Road, Greenbelt, MD 20771. FOR... Session with the NAC Science Committee on Mars Program Planning Group and Joint Robotic Precursor...

  11. 76 FR 31968 - National Institute on Drug Abuse; Notice of Closed Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... personal privacy. Name of Committee: National Institute on Drug Abuse Special Emphasis Panel; Technical... Specialist, Office of Extramural Affairs, National Institute on Drug Abuse, NIH, DHHS, Room 4227, MSC 9550... Federal Domestic Assistance Program Nos.: 93.279, Drug Abuse and Addiction Research Programs, National...

  12. 20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  13. Questions Facility Planners Should Ask about the Future.

    ERIC Educational Resources Information Center

    Keough, Katherine E.; Earthman, Glen I.

    1984-01-01

    The expected rise in enrollment may be just a 10-year window of growth, followed by another period of decline. Changes will occur in the manner that technical and vocational courses are taught. The emphasis on light industry and electronics will require new instructional areas including "clean rooms." (MLF)

  14. 26 CFR 601.901 - Missing children shown on penalty mail.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... those which have been updated to reflect a missing child's current age through computer enhancement... shelf-life guideline. (d) Reports and contact official. IRS shall compile and submit to OJJDP reports on... Division, Technical Publications Branch, OP:FS:FP:P:3, Room 5613, Internal Revenue Service, 1111...

  15. 26 CFR 601.901 - Missing children shown on penalty mail.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... those which have been updated to reflect a missing child's current age through computer enhancement... shelf-life guideline. (d) Reports and contact official. IRS shall compile and submit to OJJDP reports on... Division, Technical Publications Branch, OP:FS:FP:P:3, Room 5613, Internal Revenue Service, 1111...

  16. 26 CFR 601.901 - Missing children shown on penalty mail.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... those which have been updated to reflect a missing child's current age through computer enhancement... shelf-life guideline. (d) Reports and contact official. IRS shall compile and submit to OJJDP reports on... Division, Technical Publications Branch, OP:FS:FP:P:3, Room 5613, Internal Revenue Service, 1111...

  17. 26 CFR 601.901 - Missing children shown on penalty mail.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... those which have been updated to reflect a missing child's current age through computer enhancement... shelf-life guideline. (d) Reports and contact official. IRS shall compile and submit to OJJDP reports on... Division, Technical Publications Branch, OP:FS:FP:P:3, Room 5613, Internal Revenue Service, 1111...

  18. 26 CFR 601.901 - Missing children shown on penalty mail.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... those which have been updated to reflect a missing child's current age through computer enhancement... shelf-life guideline. (d) Reports and contact official. IRS shall compile and submit to OJJDP reports on... Division, Technical Publications Branch, OP:FS:FP:P:3, Room 5613, Internal Revenue Service, 1111...

  19. Remote autopsy services: A feasibility study on nine cases.

    PubMed

    Vodovnik, Aleksandar; Aghdam, Mohammad Reza F; Espedal, Dan Gøran

    2017-01-01

    Introduction We have conducted a feasibility study on remote autopsy services in order to increase the flexibility of the service with benefits for teaching and interdepartmental collaboration. Methods Three senior staff pathologists, one senior autopsy technician and one junior resident participated in the study. Nine autopsies were performed by the autopsy technician or resident, supervised by the primary pathologist, through the secure, double encrypted video link using Jabber Video (Cisco) with a high-speed broadband connection. The primary pathologist and autopsy room each connected to the secure virtual meeting room using 14″ laptops with in-built cameras (Hewlett-Packard). A portable high-definition web camera (Cisco) was used in the autopsy room. Primary and secondary pathologists independently interpreted and later compared gross findings for the purpose of quality assurance. The video was streamed live only during consultations and interpretation. A satisfaction survey on technical and professional aspects of the study was conducted. Results Independent interpretations of gross findings between primary and secondary pathologists yielded full agreement. A definite cause of death in one complex autopsy was determined following discussions between pathologists and reviews of the clinical notes. Our satisfaction level with the technical and professional aspects of the study was 87% and 97%, respectively. Discussion Remote autopsy services are found to be feasible in the hands of experienced staff, with increased flexibility and interest of autopsy technicians in the service as a result.

  20. KSC-2014-1973

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – The Mobile Launcher is visible through a window inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  1. Front view of bldg 30 which houses mission control

    NASA Image and Video Library

    1984-08-30

    41D-3072 (30 Aug 1984) --- A 41-D shift change is taking place in the Johnson Space Center's Building 30. In its twenty years of operation, the mission control center has been the scene of many such changes. The windowless wing at left houses three floors, including rooms supporting flight control rooms 1 & 2 (formerly called mission operations control rooms 1 & 2).

  2. VIEW OF CABLES AND TAPES ASSOCIATED WITH ADRIVE CONTROL ROD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF CABLES AND TAPES ASSOCIATED WITH A-DRIVE CONTROL ROD SYSTEM, AT LEVEL +15’, DIRECTLY ABOVE PDP CONTROL ROOM, LOOKING NORTHWEST. THE CABLES FROM THE PDP ROOM GO THROUGH THE CONCRETE WALL, MAKE A RIGHT ANGLE TURN DOWNWARD, AND DESCEND INTO THE PDP CONTROL ROOM AS VERTICAL TAPES - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  3. 10. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Interior view of control room in Components Test Laboratory (T-27), looking east. The control room is located in the center of the building and abuts the Test Cell 8, 9, and 10 and equipment room wings. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  4. 3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE TRANSFORMER ROOM). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  5. 5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ROOM; PASS-THROUGH FOR EXPOSED FILM ON RIGHT - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  6. Measuring Human Performance in Simulated Nuclear Power Plant Control Rooms Using Eye Tracking

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kovesdi, Casey Robert; Rice, Brandon Charles; Bower, Gordon Ross

    Control room modernization will be an important part of life extension for the existing light water reactor fleet. As part of modernization efforts, personnel will need to gain a full understanding of how control room technologies affect performance of human operators. Recent advances in technology enables the use of eye tracking technology to continuously measure an operator’s eye movement, which correlates with a variety of human performance constructs such as situation awareness and workload. This report describes eye tracking metrics in the context of how they will be used in nuclear power plant control room simulator studies.

  7. KSC-2014-1972

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  8. Interior of display area (room 101), looking south towards TV ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of display area (room 101), looking south towards TV control panel room (room 139) at far left corner. The stairway leads to the commander's quarters and the senior battle viewing bridge at top right. Control and communication consoles at the right - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  9. Natural radioactivity in building material in the European Union: robustness of the activity concentration index I and comparison with a room model.

    PubMed

    Nuccetelli, C; Risica, S; D'Alessandro, M; Trevisi, R

    2012-09-01

    Using a wide database collected in the last 10 years, the authors have calculated the activity concentration index I for many building materials in the European Union. Suggested by a European technical guidance document, the index I has recently been adopted as a screening tool in the proposal for the new Euratom basic safety standards directive. The paper analyses the possible implications of the choice of different parameters for the computation of index I, i.e. background to be subtracted, dose criteria, etc. With the collected data an independent assessment of gamma doses was also made with an ISS room model, choosing reasonable hypotheses on the use of materials. The results of the two approaches, i.e. index I and a room model, were compared.

  10. [Effects of acaoustic adaptation of classrooms on the quality of verbal communication].

    PubMed

    Mikulski, Witold

    2013-01-01

    Voice organ disorders among teachers are caused by excessive voice strain. One of the measures to reduce this strain is to decrease background noise when teaching. Increasing the acoustic absorption of the room is a technical measure for achieving this aim. The absorption level also improves speech intelligibility rated by the following parameters: room reverberation time and speech transmission index (STI). This article presents the effects of acoustic adaptation of classrooms on the quality of verbal communication, aimed at getting the speech intelligibility at the good or excellent level. The article lists the criteria for evaluating classrooms in terms of the quality of verbal communication. The parameters were defined, using the measurement methods according to PN-EN ISO 3382-2:2010 and PN-EN 60268-16:2011. Acoustic adaptations were completed in two classrooms. After completing acoustic adaptations the reverberation time for the frequency of 1 kHz was reduced: in room no. 1 from 1.45 s to 0.44 s and in room no. 2 from 1.03 s to 0.37 s (maximum 0.65 s). At the same time, the speech transmission index increased: in room no. 1 from 0.55 (satisfactory speech intelligibility) to 0.75 (speech intelligibility close to excellent); in room no. 2 from 0.63 (good speech intelligibility) to 0.80 (excellent speech intelligibility). Therefore, it can be stated that prior to completing acoustic adaptations room no. 1 did not comply and room no. 2 barely complied with the criterion (speech transmission index of 0.62). After completing acoustic adaptations both rooms meet the requirements.

  11. Hybrid simulation: bringing motivation to the art of teamwork training in the operating room.

    PubMed

    Kjellin, A; Hedman, L; Escher, C; Felländer-Tsai, L

    2014-12-01

    Crew resource management-based operating room team training will be an evident part of future surgical training. Hybrid simulation in the operating room enables the opportunity for trainees to perform higher fidelity training of technical and non-technical skills in a realistic context. We focus on situational motivation and self-efficacy, two important factors for optimal learning in light of a prototype course for teams of residents in surgery and anesthesiology and nurses. Authentic operating room teams consisting of residents in anesthesia (n = 2), anesthesia nurses (n = 3), residents in surgery (n = 2), and scrub nurses (n = 6) were, during a one-day course, exposed to four different scenarios. Their situational motivation was self-assessed (ranging from 1 = does not correspond at all to 7 = corresponds exactly) immediately after training, and their self-efficacy (graded from 1 to 7) before and after training. Training was performed in a mock-up operating theater equipped with a hybrid patient simulator (SimMan 3G; Laerdal) and a laparoscopic simulator (Lap Mentor Express; Simbionix). The functionality of the systematic hybrid procedure simulation scenario was evaluated by an exit questionnaire (graded from 1 = disagree entirely to 5 = agree completely). The trainees were mostly intrinsically motivated, engaged for their own sake, and had a rather great degree of self-determination toward the training situation. Self-efficacy among the team members improved significantly from 4 to 6 (median). Overall evaluation showed very good result with a median grading of 5. We conclude that hybrid simulation is feasible and has the possibility to train an authentic operating team in order to improve individual motivation and confidence. © The Finnish Surgical Society 2014.

  12. Impact of imaging room environment: staff job stress and satisfaction, patient satisfaction, and willingness to recommend.

    PubMed

    Quan, Xiaobo; Joseph, Anjali; Ensign, Janet C

    2012-01-01

    The built environment significantly affects the healthcare experiences of patients and staff. Healthcare administrators and building designers face the opportunity and challenge of improving healthcare experience and satisfaction through better environmental design. The purpose of the study was to evaluate how a novel environmental intervention for imaging rooms, which integrated multiple elements of healing environments including positive distractions and personal control over environment, affects the perceptions and satisfactions of its primary users-patients and staff. Anonymous questionnaire surveys were conducted to compare patient and staff perceptions of the physical environment, satisfaction, and stress in two types of imaging rooms: imaging rooms with the intervention installed (intervention rooms) and traditionally designed rooms without the intervention (comparison rooms). Imaging technologists and patients perceived the intervention rooms to be significantly more pleasant-looking. Patients in the intervention rooms reported significantly higher levels of environmental control and were significantly more willing to recommend the intervention rooms to others. The environmental intervention was effective in improving certain aspects of the imaging environment: pleasantness and environmental control. Further improvement of the imaging environment is needed to address problematic areas such as noise.

  13. 11. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Historic view of Building 100 control room, showing personnel operating rocket engine test controls and observer watching activity from observation room. May 27, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45020. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  14. Advanced visualization platform for surgical operating room coordination: distributed video board system.

    PubMed

    Hu, Peter F; Xiao, Yan; Ho, Danny; Mackenzie, Colin F; Hu, Hao; Voigt, Roger; Martz, Douglas

    2006-06-01

    One of the major challenges for day-of-surgery operating room coordination is accurate and timely situation awareness. Distributed and secure real-time status information is key to addressing these challenges. This article reports on the design and implementation of a passive status monitoring system in a 19-room surgical suite of a major academic medical center. Key design requirements considered included integrated real-time operating room status display, access control, security, and network impact. The system used live operating room video images and patient vital signs obtained through monitors to automatically update events and operating room status. Images were presented on a "need-to-know" basis, and access was controlled by identification badge authorization. The system delivered reliable real-time operating room images and status with acceptable network impact. Operating room status was visualized at 4 separate locations and was used continuously by clinicians and operating room service providers to coordinate operating room activities.

  15. KSC-2014-1971

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations Program is overseeing efforts to create a new multi-user firing room in Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. Sub-flooring has been installed and the room is marked off to create four separate rooms on the main floor. In view along the soffit are space shuttle launch plaques for 21 missions launched from Firing Room 4. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  16. A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BLanc, Katya Le; Powers, David; Joe, Jeffrey

    2015-08-01

    Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologiesmore » that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.« less

  17. 29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING SOUTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  18. 28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING NORTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  19. West wall, display area (room 101), view 1 of 4: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    West wall, display area (room 101), view 1 of 4: southwest corner, showing stairs to commander's quarters and viewing bridge, windows to controller's room (room 102), south end of control consoles, and holes in pedestal floor for computer equipment cables (tape drive I/O?) - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  20. Operating room myths: what is the evidence for common practices.

    PubMed

    Pada, Surinder; Perl, Trish M

    2015-08-01

    In order to ensure patient safety and prevent surgical site infections (SSIs), operating theaters/rooms have evolved into complex, highly technical environments. Prevention of healthcare-associated infections, and strategies to limit patient harm, have gained momentum over the last decade. This article aims to examine and dispute some commonly held beliefs with specific reference to: laminar airflow, noise and operating theater door openings and how these impact SSI. Laminar airflow may not be necessary for prosthetic implant surgery. Some recent data suggest that there may be patient harm. With the development of better surgical techniques and perioperative care, such costly systems may not be needed. Operating rooms with a high number of door openings have also been shown to experience higher SSI rates, as have operating rooms with high noise levels. These may serve as surrogate markers for operating room discipline. Initiatives which target these areas may be worth considering when devising strategies to reduce SSIs. Improved surveillance systems for SSIs are needed and should include operating theater airflow type. This will allow further analysis of the effect of laminar air flow on SSIs and provide evidence for a decisive recommendation. Cultivating a culture of good operating theater discipline may also reduce SSIs.

  1. Air cleaning technologies: an evidence-based analysis.

    PubMed

    2005-01-01

    This health technology policy assessment will answer the following questions: When should in-room air cleaners be used?How effective are in-room air cleaners?Are in-room air cleaners that use combined HEPA and UVGI air cleaning technology more effective than those that use HEPA filtration alone?What is the Plasmacluster ion air purifier in the pandemic influenza preparation plan?The experience of severe acute respiratory syndrome (SARS) locally, nationally, and internationally underscored the importance of administrative, environmental, and personal protective infection control measures in health care facilities. In the aftermath of the SARS crisis, there was a need for a clearer understanding of Ontario's capacity to manage suspected or confirmed cases of airborne infectious diseases. In so doing, the Walker Commission thought that more attention should be paid to the potential use of new technologies such as in-room air cleaning units. It recommended that the Medical Advisory Secretariat of the Ontario Ministry of Health and Long-Term Care evaluate the appropriate use and effectiveness of such new technologies. Accordingly, the Ontario Health Technology Advisory Committee asked the Medical Advisory Secretariat to review the literature on the effectiveness and utility of in-room air cleaners that use high-efficiency particle air (HEPA) filters and ultraviolet germicidal irradiation (UVGI) air cleaning technology. Additionally, the Ontario Health Technology Advisory Committee prioritized a request from the ministry's Emergency Management Unit to investigate the possible role of the Plasmacluster ion air purifier manufactured by Sharp Electronics Corporation, in the pandemic influenza preparation plan. Airborne transmission of infectious diseases depends in part on the concentration of breathable infectious pathogens (germs) in room air. Infection control is achieved by a combination of administrative, engineering, and personal protection methods. Engineering methods that are usually carried out by the building's heating, ventilation, and air conditioning (HVAC) system function to prevent the spread of airborne infectious pathogens by diluting (dilution ventilation) and removing (exhaust ventilation) contaminated air from a room, controlling the direction of airflow and the air flow patterns in a building. However, general wear and tear over time may compromise the HVAC system's effectiveness to maintain adequate indoor air quality. Likewise, economic issues may curtail the completion of necessary renovations to increase its effectiveness. Therefore, when exposure to airborne infectious pathogens is a risk, the use of an in-room air cleaner to reduce the concentration of airborne pathogens and prevent the spread of airborne infectious diseases has been proposed as an alternative to renovating a HVAC system. Airborne transmission is the spread of infectious pathogens over large distances through the air. Infectious pathogens, which may include fungi, bacteria, and viruses, vary in size and can be dispersed into the air in drops of moisture after coughing or sneezing. Small drops of moisture carrying infectious pathogens are called droplet nuclei. Droplet nuclei are about 1 to 5μm in diameter. This small size in part allows them to remain suspended in the air for several hours and be carried by air currents over considerable distances. Large drops of moisture carrying infectious pathogens are called droplets. Droplets being larger than droplet nuclei, travel shorter distances (about 1 metre) before rapidly falling out of the air to the ground. Because droplet nuclei remain airborne for longer periods than do droplets, they are more amenable to engineering infection control methods than are droplets. Droplet nuclei are responsible for the airborne transmission of infectious diseases such as tuberculosis, chicken pox (varicella), measles (rubeola), and dessiminated herpes zoster, whereas close contact is required for the direct transmission of infectious diseases transmitted by droplets, such as influenza (the flu) and SARS. In-room air cleaners are supplied as portable or fixed devices. Fixed devices can be attached to either a wall or ceiling and are preferred over portable units because they have a greater degree of reliability (if installed properly) for achieving adequate room air mixing and airflow patterns, which are important for optimal effectiveness. Through a method of air recirculation, an in-room air cleaner can be used to increase room ventilation rates and if used to exhaust air out of the room it can create a negative-pressure room for airborne infection isolation (AII) when the building's HVAC system cannot do so. A negative-pressure room is one where clean air flows into the room but contaminated air does not flow out of it. Contaminated room air is pulled into the in-room air cleaner and cleaned by passing through a series of filters, which remove the airborne infectious pathogens. The cleaned air is either recirculated into the room or exhausted outside the building. By filtering contaminated room air and then recirculating the cleaned air into the room, an in-room air cleaner can improve the room's ventilation. By exhausting the filtered air to the outside the unit can create a negative-pressure room. There are many types of in-room air cleaners. They vary widely in the airflow rates through the unit, the type of air cleaning technology used, and the technical design. Crucial to maximizing the efficiency of any in-room air cleaner is its strategic placement and set-up within a room, which should be done in consultation with ventilation engineers, infection control experts, and/or industrial hygienists. A poorly positioned air cleaner may disrupt airflow patterns within the room and through the air cleaner, thereby compromising its air cleaning efficiency. The effectiveness of an in-room air cleaner to remove airborne pathogens from room air depends on several factors, including the airflow rate through the unit's filter and the airflow patterns in the room. Tested under a variety of conditions, in-room air cleaners, including portable or ceiling mounted units with either a HEPA or a non-HEPA filter, portable units with UVGI lights only, or ceiling mounted units with combined HEPA filtration and UVGI lights, have been estimated to be between 30% and 90%, 99% and 12% and 80% effective, respectively. However, and although their effectiveness is variable, the United States Centers for Disease Control and Prevention has acknowledged in-room air cleaners as alternative technology for increasing room ventilation when this cannot be achieved by the building's HVAC system with preference given to fixed recirculating systems over portable ones. Importantly, the use of an in-room air cleaner does not preclude either the need for health care workers and visitors to use personal protective equipment (N95 mask or equivalent) when entering AII rooms or health care facilities from meeting current regulatory requirements for airflow rates (ventilation rates) in buildings and airflow differentials for effective negative-pressure rooms. The Plasmacluster ion technology, developed in 2000, is an air purification technology. Its manufacturer, Sharp Electronics Corporation, says that it can disable airborne microorganisms through the generation of both positive and negative ions. (1) The functional unit is the hydroxyl, which is a molecule comprised of one oxygen molecule and one hydrogen atom. Plasmacluster ion air purifier uses a multilayer filter system composed of a prefilter, a carbon filter, an antibacterial filter, and a HEPA filter, combined with an ion generator to purify the air. The ion generator uses an alternating plasma discharge to split water molecules into positively and negatively charged ions. When these ions are emitted into the air, they are surrounded by water molecules and form cluster ions which are attracted to airborne particles. The cluster ion surrounds the airborne particle, and the positive and negative ions react to form hydroxyls. These hydroxyls steal the airborne particle's hydrogen atom, which creates a hole in the particle's outer protein membrane, thereby rendering it inactive. Because influenza is primarily acquired by large droplets and direct and indirect contact with an infectious person, any in-room air cleaner will have little benefit in controlling and preventing its spread. Therefore, there is no role for the Plasmacluster ion air purifier or any other in-room air cleaner in the control of the spread of influenza. Accordingly, for purposes of this review, the Medical Advisory Secretariat presents no further analysis of the Plasmacluster. The objective of the systematic review was to determine the effectiveness of in-room air cleaners with built in UVGI lights and HEPA filtration compared with those using HEPA filtration only. The Medical Advisory Secretariat searched the databases of MEDLINE, EMBASE, Cochrane Database of Systematic Reviews, INAHATA (International Network of Agencies for Health Technology Assessment), Biosis Previews, Bacteriology Abstracts, Web of Science, Dissertation Abstracts, and NIOSHTIC 2. A meta-analysis was conducted if adequate data was available from 2 or more studies and where statistical and clinical heterogeneity among studies was not an issue. Otherwise, a qualitative review was completed. The GRADE system was used to summarize the quality of the body of evidence comprised of 1 or more studies. There were no existing health technology assessments on air cleaning technology located during the literature review. The literature search yielded 59 citations of which none were retained. (ABSTRACT TRUNCATED)

  2. Governing time in operating rooms.

    PubMed

    Riley, Robin; Manias, Elizabeth

    2006-05-01

    This paper examines how time is controlled and governed in operating rooms through interpersonal communication between nurses and doctors. Time is a valuable commodity in organizations with improvements often directed towards maximizing efficiencies. As a consequence, time can be a source of tension and interpersonal conflict as individuals compete for control of its use. The data in this paper emanate from an ethnographic study that explored a range of communication practices in operating room nursing. Participants comprised 11 operating room nurses. Data were collected over two years in three different institutional settings and involved participant observation, interviews and the keeping of a personal diary. A deconstructive analysis of the data was undertaken. Results are discussed in terms of the practices, in which clinicians are engaged in, to govern and control their use of time. The four practices presented in this paper include; questioning judgment and timing, controlling speed, estimating surgeons' use of time and coping with different perceptions of time. Time and speed were hotly contested by nurses. They used their personal knowledge of individual surgeon's habits of time to govern and control practice. Nurses thought about surgeons in terms of time and developed commonly accepted understandings about the length of surgical procedures. They used this knowledge to manage the scheduling of operations in the departments and to control the workflow in individual operating rooms. Knowledge of individual surgeons was a source of power for operating room nurses. Nurses have more power in the operating room than might be imagined but they exercise this power in subtle ways. If operating rooms are to work effectively, the operating room team must understand each others' work better.

  3. Promoting Hand Hygiene With a Lighting Prompt.

    PubMed

    Diegel-Vacek, Lauren; Ryan, Catherine

    2016-10-01

    The objective of this pilot study was to assess an automatic sink light design intervention as a prompt for clinician hand hygiene (as defined by World Health Organization [WHO]). Healthcare-associated infections (HAIs) are still leading causes of morbidity and mortality and contribute to burdens on our healthcare system. Hand hygiene has been related to reducing the rate of HAIs and positively impacting both patient and hospital outcomes. This pilot study was a prospective, longitudinal observational study of a convenience sample of healthcare clinicians. In one inpatient room, clinicians were exposed to a hand hygiene reminder that consisted of a light turning on over the sink as they entered. A control room (the adjacent inpatient room) did not have the intervention. A total of 88 clinician encounters were monitored during the study. On the first observation day at the initial activation of the signal light system, the percentage of clinicians performing hand hygiene upon entering a room was only 7% in the control room and 23% in the intervention room. During the second observation (Day 14), those percentages were 16% in the control room and 30% in the intervention room. During the third observation (Day 21), those percentages were 23% in the control room and 23% in the intervention room. The healthcare system frequently relies on expensive technology to improve healthcare delivery, but implementation of low-cost, low-technology methods such as this light may be effective in prompting hand hygiene. © The Author(s) 2016.

  4. Virtual reality simulator: demonstrated use in neurosurgical oncology.

    PubMed

    Clarke, David B; D'Arcy, Ryan C N; Delorme, Sebastien; Laroche, Denis; Godin, Guy; Hajra, Sujoy Ghosh; Brooks, Rupert; DiRaddo, Robert

    2013-04-01

    The overriding importance of patient safety, the complexity of surgical techniques, and the challenges associated with teaching surgical trainees in the operating room are all factors driving the need for innovative surgical simulation technologies. Despite these issues, widespread use of virtual reality simulation technology in surgery has not been fully implemented, largely because of the technical complexities in developing clinically relevant and useful models. This article describes the successful use of the NeuroTouch neurosurgical simulator in the resection of a left frontal meningioma. The widespread application of surgical simulation technology has the potential to decrease surgical risk, improve operating room efficiency, and fundamentally change surgical training.

  5. Room temperature stretch forming of scale space shuttle external tank dome gores. Volume 1: Technical

    NASA Technical Reports Server (NTRS)

    Blunck, R. D.; Krantz, D. E.

    1974-01-01

    An account of activities and data gathered in the Room Temperature Stretch Forming of One-third Scale External Tank Bulkhead Gores for space shuttle study, and a tooling design and production cost study are reported. The following study phases are described: (1) the stretch forming of three approximately one-third scale external tank dome gores from single sheets of 2219-T37 aluminum alloy; (2) the designing of a full scale production die, including a determination of tooling requirements; and (3) the determination of cost per gore at the required production rates, including manufacturing, packaging, and shipping.

  6. Design of the thermal insulating test system for doors and windows of buildings

    NASA Astrophysics Data System (ADS)

    Yu, Yan; Qi, Jinqing; Xu, Yunwei; Wu, Hao; Ou, Jinping

    2011-04-01

    Thermal insulating properties of doors and widows are important parameter to measure the quality of windows and doors. This paper develops the thermal insulating test system of doors and windows for large temperature difference in winter in north of China according to national standards. This system is integrated with temperature measurement subsystem, temperature control subsystem, the heating power measurement subsystem, and heat transfer coefficient calculated subsystem. The temperature measurement subsystem includes temperature sensor which is implemented by sixty-four thermocouple sensors to measure the key positions of cold room and hot room, and the temperature acquisition unit which adopts Agilent 34901A data acquisition card to achieve self-compensation and accurate temperature capture. The temperature control subsystem including temperature controller and compressor system is used to control the temperature between 0 degree to 20 degree for hot room and -20 degree to 0 degree for cold room. The hot room controller uses fuzzy control algorithm to achieve accurate control of temperature and the cold room controller firstly uses compressor to achieve coarse control and then uses more accurate temperature controller unit to obtain constant temperature(-20 degree). The heating power measurement is mainly to get the heat power of hot room heating devices. After above constant temperature environment is constructed, software of the test system is developed. Using software, temperature data and heat power data can be accurately got and then the heat transfer coefficient, representing the thermal insulating properties of doors and widows, is calculated using the standard formula. Experimental results show that the test system is simple, reliable and precise. It meets the testing requirements of national standard and has a good application prospect.

  7. 75 FR 67345 - Agricultural Policy Advisory Committee for Trade and the Agricultural Technical Advisory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ..., UPS, etc.) to the Office of Negotiations and Agreements, Foreign Agricultural Service, USDA, Room 5603.... The Office of Negotiations and Agreements may be reached by telephone at (202) 720-6219, with... sector advisory committee system to ensure that U.S. trade policy and negotiation objectives adequately...

  8. 75 FR 56055 - Advisory Committee and Species Working Group Technical Advisor Appointments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Ms. Rachel O'Malley, Office of International Affairs, National Marine Fisheries Service, NOAA, Room..., Silver Spring, MD 20910. Nominations can also be provided via fax (301-713-2313) or e-mail ( Rachel.O'Malley@noaa.gov and [email protected] ). FOR FURTHER INFORMATION CONTACT: Keith Cialino, 301-713...

  9. 77 FR 43808 - Advisory Committee and Species Working Group Technical Advisor Appointment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... sent via email ( Rachel.O'Malley@noaa.gov ). In the alternative, nominations may be sent via mail to Rachel O'Malley at NMFS, Office of International Affairs, Room 12622, 1315 East-West Highway, Silver Spring, MD 20910. FOR FURTHER INFORMATION CONTACT: Rachel O'Malley, Office of International Affairs, 301...

  10. 75 FR 75705 - Notice of Availability of the Models for Plant-Specific Adoption of Technical Specifications Task...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ..., Rockville, Maryland. NRC's Agencywide Documents Access and Management System (ADAMS): Publicly available documents created or received at the NRC are available electronically at the NRC's Electronic Reading Room... Specifications End States (BAW- 2441).'' TSTF-431, Revision 3, is available in the Agencywide Documents Access...

  11. FloorPlan. Courseware Evaluation for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Rosenfeld, Vila M.; And Others

    This courseware evaluation rates the "FloorPlan" program developed by the Learning Seed. (The program--not included in this document--allows room design and arrangement to be performed on the computer screen.) The courseware was rated by a team of home economists participating in a network for the dissemination of courseware reviews.…

  12. Development and Evaluation of a Vocational Experience Curriculum for Educable and Disadvantaged Students. Final Report.

    ERIC Educational Resources Information Center

    Hardin County Board of Education, Elizabethtown, KY.

    A project was designed to measure the effects of integrating basic reading and mathematical instruction with prevocational instruction through the addition of a basic skills resource room, a technical simulation unit, and guidance and counseling to the ninth grade vocational experience program for educable mentally handicapped and disadvantaged…

  13. General Education at the Coast Guard Academy.

    ERIC Educational Resources Information Center

    Sanders, William A.

    In seeking the most effective presentation of the liberal arts in curricula such as the heavily technical and professional curricula at the U.S. Coast Guard Academy, which leave little room for general education, general education course design must capture the imagination of students and motivate them for continuing self-education. Development of…

  14. Implementing and Assessing the Converging-Diverging Model of Design in a Sequence of Sophomore Projects

    ERIC Educational Resources Information Center

    Dahm, Kevin; Riddell, William; Constans, Eric; Courtney, Jennifer; Harvey, Roberta; Von Lockette, Paris

    2009-01-01

    This paper discusses a sophomore-level course that teaches engineering design and technical writing. Historically, the course was taught using semester-long design projects. Most students' overall approach to design problems left considerable room for improvement. Many teams chose a design without investigating alternatives, and important…

  15. 75 FR 27330 - Credit Reforms in Organized Wholesale Electric Markets; Notice of Agenda for Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Credit Reforms in Organized Wholesale Electric Markets Notice of Proposed Rulemaking\\1\\ regarding whether... Credit Reforms in Organized Electric Markets May 11, 2010 Commission Meeting Room Agenda 9-9:05 a.m... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM10-13-000] Credit Reforms...

  16. Software Support during a Control Room Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michele Joyce; Michael Spata; Thomas Oren

    2005-09-21

    In 2004, after 14 years of accelerator operations and commissioning, Jefferson Lab renovated its main control room. Changes in technology and lessons learned during those 14 years drove the control room redesign in a new direction, one that optimizes workflow and makes critical information and controls available to everyone in the control room. Fundamental changes in a variety of software applications were required to facilitate the new operating paradigm. A critical component of the new control room design is a large-format video wall that is used to make a variety of operating information available to everyone in the room. Analogmore » devices such as oscilloscopes and function generators are now displayed on the video wall through two crosspoint switchers: one for analog signals and another for video signals. A new software GUI replaces manual configuration of the oscilloscopes and function generators and helps automate setup. Monitoring screens, customized for the video wall, now make important operating information visible to everyone, not just a single operator. New alarm handler software gives any operator, on any workstation, access to all alarm handler functionality, and multiple users can now contribute to a single electronic logbook entry. To further support the shift to distributed access and control, many applications have been redesigned to run on servers instead of on individual workstations.« less

  17. Relationship between intraoperative non-technical performance and technical events in bariatric surgery.

    PubMed

    Fecso, A B; Kuzulugil, S S; Babaoglu, C; Bener, A B; Grantcharov, T P

    2018-03-30

    The operating theatre is a unique environment with complex team interactions, where technical and non-technical performance affect patient outcomes. The correlation between technical and non-technical performance, however, remains underinvestigated. The purpose of this study was to explore these interactions in the operating theatre. A prospective single-centre observational study was conducted at a tertiary academic medical centre. One surgeon and three fellows participated as main operators. All patients who underwent a laparoscopic Roux-en-Y gastric bypass and had the procedures captured using the Operating Room Black Box ® platform were included. Technical assessment was performed using the Objective Structured Assessment of Technical Skills and Generic Error Rating Tool instruments. For non-technical assessment, the Non-Technical Skills for Surgeons (NOTSS) and Scrub Practitioners' List of Intraoperative Non-Technical Skills (SPLINTS) tools were used. Spearman rank-order correlation and N-gram statistics were conducted. Fifty-six patients were included in the study and 90 procedural steps (gastrojejunostomy and jejunojejunostomy) were analysed. There was a moderate to strong correlation between technical adverse events (r s  = 0·417-0·687), rectifications (r s  = 0·380-0·768) and non-technical performance of the surgical and nursing teams (NOTSS and SPLINTS). N-gram statistics showed that after technical errors, events and prior rectifications, the staff surgeon and the scrub nurse exhibited the most positive non-technical behaviours, irrespective of operator (staff surgeon or fellow). This study demonstrated that technical and non-technical performances are related, on both an individual and a team level. Valuable data can be obtained around intraoperative errors, events and rectifications. © 2018 BJS Society Ltd Published by John Wiley & Sons Ltd.

  18. Play to Become a Surgeon: Impact of Nintendo WII Training on Laparoscopic Skills

    PubMed Central

    Giannotti, Domenico; Patrizi, Gregorio; Di Rocco, Giorgio; Vestri, Anna Rita; Semproni, Camilla Proietti; Fiengo, Leslie; Pontone, Stefano; Palazzini, Giorgio; Redler, Adriano

    2013-01-01

    Background Video-games have become an integral part of the new multimedia culture. Several studies assessed video-gaming enhancement of spatial attention and eye-hand coordination. Considering the technical difficulty of laparoscopic procedures, legal issues and time limitations, the validation of appropriate training even outside of the operating rooms is ongoing. We investigated the influence of a four-week structured Nintendo® Wii™ training on laparoscopic skills by analyzing performance metrics with a validated simulator (Lap Mentor™, Simbionix™). Methodology/Principal Findings We performed a prospective randomized study on 42 post-graduate I–II year residents in General, Vascular and Endoscopic Surgery. All participants were tested on a validated laparoscopic simulator and then randomized to group 1 (Controls, no training with the Nintendo® Wii™), and group 2 (training with the Nintendo® Wii™) with 21 subjects in each group, according to a computer-generated list. After four weeks, all residents underwent a testing session on the laparoscopic simulator of the same tasks as in the first session. All 42 subjects in both groups improved significantly from session 1 to session 2. Compared to controls, the Wii group showed a significant improvement in performance (p<0.05) for 13 of the 16 considered performance metrics. Conclusions/Significance The Nintendo® Wii™ might be helpful, inexpensive and entertaining part of the training of young laparoscopists, in addition to a standard surgical education based on simulators and the operating room. PMID:23460845

  19. KSC-2014-2302

    NASA Image and Video Library

    2014-04-25

    CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis

  20. KSC-2014-2304

    NASA Image and Video Library

    2014-04-25

    CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis

  1. KSC-2014-2303

    NASA Image and Video Library

    2014-04-25

    CAPE CANAVERAL, Fla. – Construction workers have installed the framing and some of the inner walls inside Firing Room 4 in the Launch Control Center at NASA's Kennedy Space Center in Florida. Three rows of upper level management consoles remain. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Dimitri Gerondidakis

  2. Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeffrey C. JOe; Ronald L. Boring

    Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understandmore » from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.« less

  3. 5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking northeast to firing control room passageway. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  4. 83. DETAIL OF HONEYWELL AIRCONDITIONING CONTROLS IN SLC3E CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    83. DETAIL OF HONEYWELL AIR-CONDITIONING CONTROLS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. 10. Credit BG. Interior of control and observation room at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Credit BG. Interior of control and observation room at Control and Recording Center Building 4221/E-22. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  6. Nuclear reactor control room construction

    DOEpatents

    Lamuro, R.C.; Orr, R.

    1993-11-16

    A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures.

  7. Nuclear reactor control room construction

    DOEpatents

    Lamuro, Robert C.; Orr, Richard

    1993-01-01

    A control room 10 for a nuclear plant is disclosed. In the control room, objects 12, 20, 22, 26, 30 are no less than four inches from walls 10.2. A ceiling 32 contains cooling fins 35 that extend downwards toward the floor from metal plates 34. A concrete slab 33 is poured over the plates. Studs 36 are welded to the plates and are encased in the concrete.

  8. 17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON LEFT, SIGNAL CONTROLS ON RIGHT, WHISTLE PULL TOP. RADIO TELEPHONE IN CENTER BACK (Fred Small) - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR

  9. The modern brain tumor operating room: from standard essentials to current state-of-the-art.

    PubMed

    Barnett, Gene H; Nathoo, Narendra

    2004-01-01

    It is just over a century since successful brain tumor resection. Since then the diagnosis, imaging, and management of brain tumors have improved, in large part due to technological advances. Similarly, the operating room (OR) for brain tumor surgery has increased in complexity and specificity with multiple forms of equipment now considered necessary as technical adjuncts. It is evident that the theme of minimalism in combination with advanced image-guidance techniques and a cohort of sophisticated technologies (e.g., robotics and nanotechnology) will drive changes in the current OR environment for the foreseeable future. In this report we describe what may be regarded today as standard essentials in an operating room for the surgical management of brain tumors and what we believe to be the current 'state-of-the-art' brain tumor OR. Also, we speculate on the additional capabilities of the brain tumor OR of the near future.

  10. [OR management - Checklists for OR-design for OR-managers - results of a workshop].

    PubMed

    Bock, Matthias; Steinmeyer-Bauer, Klaus; Schüpfer, Guido

    2014-10-01

    The construction of an operating room (OR) suite represents an important intermediate- and long term investment. The planning process starts with the quantitative estimation of the procedures to be carried out which defines the operative capacity for the life time of the facility. This permits the calculation of the number of ORs and the definition of the resources for the recovery room, the intermediate care and intensive care unit.The projectors should integrate the new facility into workflow, workload and logistics of the entire hospital. The simulation flow of patients and accompanying persons and of the routes of the personnel is helpful for this purpose. Separating structures for outpatients from those for inpatients and avoiding de-centralized rooms helps designing an efficient and safe OR suite.The design of the single ORs should be flexible to permit changes or technical innovations during their use period. Mobile equipment is preferable to permanently installed devices. We consider an expanse of at least 45 m(2) for any location adequate for general ORs. The space requirements are elevated for hybrid ORs and rooms dedicated for robotic surgery.The design of the suite should separate the flow of personnel, patients and logistics. Surgical instruments and their logistics should be standardized. Dedicated locations for a simultaneous preparation of the instrumentation tables permit parallel processing. Thus an adequate capacity of preparation rooms and storage rooms is necessary. Dressing rooms, rest rooms, showers and lounges are important for the working conditions and should be planned in an adequate size and number. © Georg Thieme Verlag Stuttgart · New York.

  11. KSC-2009-5248

    NASA Image and Video Library

    2009-09-25

    CAPE CANAVERAL, Fla. – This ribbon cutting officially turns over NASA Kennedy Space Center's Launch Control Center Firing Room 1 from the Space Shuttle Program to the Constellation Program. Participating are (from left) Pepper Phillips, director of the Constellation Project Office at Kennedy; Bob Cabana, Kennedy's director; Robert Crippen, former astronaut; Jeff Hanley, manager of the Constellation Program at NASA's Johnson Space Center; and Nancy Bray, deputy director of Center Operations at Kennedy. The room has undergone demolition and construction and been outfitted with consoles for the upcoming Ares I-X rocket flight test targeted for launch on Oct. 27. As the center of launch operations at Kennedy since the Apollo Program, the Launch Control Center, or LCC, has played a central role in NASA's human spaceflight programs. Firing Room 1 was the first operational firing room constructed. From this room, controllers launched the first Saturn V, the first crewed flight of Saturn V, the first crewed mission to the moon and the first space shuttle. Firing Room 1 will continue this tradition of firsts when controllers launch the Constellation Program's first flight test. Also, this firing room will be the center of operations for the upcoming Ares I and Orion operations. Photo credit: NASA/Kim Shiflett

  12. 11. CENTRAL ATLAS CONTROL CONSOLE IN SLC3W CONTROL ROOM. COMMUNICATIONS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM. COMMUNICATIONS HEADSETS IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. Photographic art in exam rooms may reduce white coat hypertension.

    PubMed

    Harper, Michael B; Kanayama-Trivedi, Stacy; Caldito, Gloria; Montgomery, David; Mayeaux, E J; DelRosso, Lourdes M

    2015-12-01

    Blood pressure (BP) elevation in medical office settings in patients who are normotensive in nonmedical settings is an effect known as 'white coat hypertension'. This phenomenon is thought to be due to situational anxiety caused by the experience of visiting a doctor and the anxiety-inducing nature of the medical office. Our study was designed to determine if carefully selected photographic art could counter the anxiety that causes white coat hypertension and lead to lower BP recordings in some patients. 117 adults, non-pregnant patients from the Louisiana State University Health Sciences Center Family Medicine Resident Clinic participated in this study. After the triage nurse measured the BP, the patients were randomly placed in either an exam room with standard medical posters (control room) or in an exam room with photographic art (photo room). The BP was measured in the exam room. After the medical visit, the patients switched rooms and the BP was measured a third time. The patients were asked to fill out a questionnaire to identify room preference. On average, the BP obtained in the control rooms was higher than that obtained in the photo rooms. There was a statistically significant difference between the mean arterial pressure, systolic BP and diastolic BP between the control room and the photo room. Landscape photographic art may have the beneficial effect of reducing BP in medical office examination rooms. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  14. CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES FOR THE VENTILATION SYSTEM AND A PLC SWITCH FOR AUTOMATIC CO (CARBON MONOXIDE) SYSTEM. THE AIR TESTING SYSTEM IS FREE STANDING AND THE FANS ARE COMPUTER-OPERATED. - Alaskan Way Viaduct and Battery Street Tunnel, Seattle, King County, WA

  15. 2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA

  16. Electrical safety during transplantation.

    PubMed

    Amicucci, G L; Di Lollo, L; Fiamingo, F; Mazzocchi, V; Platania, G; Ranieri, D; Razzano, R; Camin, G; Sebastiani, G; Gentile, P

    2010-01-01

    Technologic innovations enable management of medical equipment and power supply systems, with improvements that can affect the technical aspects, economics, and quality of medical service. Herein are outlined some technical guidelines, proposed by Istituto Superiore per la Prevenzione e la Sicurezza del Lavoro, for increasing the effectiveness of the power supply system and the safety of patients and surgeons in the operating room, with particular focus on transplantation. The dependence of diagnoses and therapies on operation of the electrical equipment can potentially cause great risk to patients. Moreover, it is possible that faulty electrical equipment could produce current that may flow through the patient. Because patients are particularly vulnerable when their natural protection is considerably decreased, as during transplantation or other surgery, power supply systems must operate with a high degree of reliability and quality to prevent risk, and must be designed to reduce hazards from direct and indirect contact. Reliability of the power supply system is closely related to the quality of the project, choice of materials, and management of the system (eg, quality and frequency of servicing). Among the proposed guidelines, other than normal referencing, are (1) adoption of a monitoring system to improve the quality of the electrical parameters in the operating room, (2) institution of emergency procedures for management of electrical faults, (3) a procedure for management of fires in the operating room, (4) and maintenance interventions and inspections of medical devices to maintain minimal requirements of safety and performance. Copyright 2010 Elsevier Inc. All rights reserved.

  17. Human factors in surgery: from Three Mile Island to the operating room.

    PubMed

    D'Addessi, Alessandro; Bongiovanni, Luca; Volpe, Andrea; Pinto, Francesco; Bassi, PierFrancesco

    2009-01-01

    Human factors is a definition that includes the science of understanding the properties of human capability, the application of this understanding to the design and development of systems and services, the art of ensuring their successful applications to a program. The field of human factors traces its origins to the Second World War, but Three Mile Island has been the best example of how groups of people react and make decisions under stress: this nuclear accident was exacerbated by wrong decisions made because the operators were overwhelmed with irrelevant, misleading or incorrect information. Errors and their nature are the same in all human activities. The predisposition for error is so intrinsic to human nature that scientifically it is best considered as inherently biologic. The causes of error in medical care may not be easily generalized. Surgery differs in important ways: most errors occur in the operating room and are technical in nature. Commonly, surgical error has been thought of as the consequence of lack of skill or ability, and is the result of thoughtless actions. Moreover the 'operating theatre' has a unique set of team dynamics: professionals from multiple disciplines are required to work in a closely coordinated fashion. This complex environment provides multiple opportunities for unclear communication, clashing motivations, errors arising not from technical incompetence but from poor interpersonal skills. Surgeons have to work closely with human factors specialists in future studies. By improving processes already in place in many operating rooms, safety will be enhanced and quality increased.

  18. TRITIUM LABORATORY, TRA666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRITIUM LABORATORY, TRA-666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT CENTER OF VIEW. SIGN ABOVE DOOR SAYS "HYDRAULIC TEST FACILITY CONTROL ROOM." SIGN IN WINDOW SAYS "EATING AREA." "EVACUATION AND EMERGENCY INFORMATION" IS POSTED ON CABINET AT LEFT OF VIEW. INL NEGATIVE NO. HD30-2-3. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  19. 13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED BEHIND MANAGER'S ART DECO-STYLE CONTROL DESK, WITH CONTROL CUBICLE 1 AT FAR RIGHT AND CONTROL CUBICLE 9 AT FAR LEFT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  20. 11. Credit BG. Interior of control and observation room at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Credit BG. Interior of control and observation room at Control and Recording Center, showing detail of switchboard and closed circuit television monitors. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  1. 5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL HOUSE LOCATED ON THE SOUTH END OF BIG TUJUNGA DAM SHOWING THE CONTROL PANEL. - Big Tujunga Dam, Control House, 809 West Big Tujunga Road, Sunland, Los Angeles County, CA

  2. Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial.

    PubMed

    Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh

    2015-05-01

    One of the strategies for a good outcome and pain free childbearing is to design the delivery room. The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants' intervention vs. 66% of control participants had perinea laceration (P = 0.041). According to the findings of the present study, distracting senses in snoezelen room decreases mother's pain intensity, the length of labor, and incidence of episiotomy.

  3. Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial

    PubMed Central

    Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh

    2015-01-01

    Background: One of the strategies for a good outcome and pain free childbearing is to design the delivery room. Objectives: The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. Patients and Methods: This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. Results: The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants’ intervention vs. 66% of control participants had perinea laceration (P = 0.041). Conclusions: According to the findings of the present study, distracting senses in snoezelen room decreases mother’s pain intensity, the length of labor, and incidence of episiotomy. PMID:26082849

  4. A simulator-based nuclear reactor emergency response training exercise.

    PubMed

    Waller, Edward; Bereznai, George; Shaw, John; Chaput, Joseph; Lafortune, Jean-Francois

    Training offsite emergency response personnel basic awareness of onsite control room operations during nuclear power plant emergency conditions was the primary objective of a week-long workshop conducted on a CANDU® virtual nuclear reactor simulator available at the University of Ontario Institute of Technology, Oshawa, Canada. The workshop was designed to examine both normal and abnormal reactor operating conditions, and to observe the conditions in the control room that may have impact on the subsequent offsite emergency response. The workshop was attended by participants from a number of countries encompassing diverse job functions related to nuclear emergency response. Objectives of the workshop were to provide opportunities for participants to act in the roles of control room personnel under different reactor operating scenarios, providing a unique experience for participants to interact with the simulator in real-time, and providing increased awareness of control room operations during accident conditions. The ability to "pause" the simulator during exercises allowed the instructors to evaluate and critique the performance of participants, and to provide context with respect to potential offsite emergency actions. Feedback from the participants highlighted (i) advantages of observing and participating "hands-on" with operational exercises, (ii) their general unfamiliarity with control room operational procedures and arrangements prior to the workshop, (iii) awareness of the vast quantity of detailed control room procedures for both normal and transient conditions, and (iv) appreciation of the increased workload for the operators in the control room during a transient from normal operations. Based upon participant feedback, it was determined that the objectives of the training had been met, and that future workshops should be conducted.

  5. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  6. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  7. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  8. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  9. 46 CFR 151.25-2 - Cargo handling space.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Cargo handling space. 151.25-2 Section 151.25-2 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Environmental Control § 151.25-2 Cargo handling space. Pump rooms, compressor rooms, refrigeration rooms, heating rooms, instrument rooms or other closed spaces...

  10. 12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  11. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING NORTH - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  12. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  13. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING EAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  14. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, FACING WEST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  15. IET control building (TAN620). control room. facing north. control consoles ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). control room. facing north. control consoles have been removed. Openings in floor were communication and control conduits. Periscope controls at center left (see also HAER No. ID-33-E-20). INEEL negative no. HD-21-3-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  16. MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG WALL. WORKERS MAKE ELECTRICAL AND OTHER CONNECTIONS. INL NEGATIVE NO. 4289. Unknown Photographer, 2/26/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  17. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... written control room management procedures that implement the requirements of this section. The procedures... define the roles and responsibilities of a controller during normal, abnormal, and emergency operating... operator must define each of the following: (1) A controller's authority and responsibility to make...

  18. 75 FR 26225 - Frequency Regulation Compensation in the Organized Wholesale Power Markets; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD10-11-000] Frequency... Meeting Room at the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. All...-Federal Reporters, Inc. (202-347-3700 or 1-800-336-6646). The transcripts will be available for free on...

  19. 75 FR 26749 - Credit Reforms in Organized Wholesale Electric Markets; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM10-13-000] Credit Reforms... conference will be held from 9 a.m. to 12:30 p.m. (EDT), in the Commission Meeting Room at the Federal Energy... to attend. The conference is free and no registration is necessary. Further notices with detailed...

  20. 75 FR 20991 - Credit Reforms in Organized Wholesale Electric Markets; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM10-13-000] Credit Reforms... conference will be held from 9 a.m. to 12:30 p.m. (EDT), in the Commission Meeting Room at the Federal Energy... to attend. The conference is free and no registration is necessary. Further notices with detailed...

  1. The Interior Design Simulator. Courseware Evaluation for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Worts, Nancy; And Others

    This courseware evaluation rates the Interior Design Simulator program developed by Orange Juice Software Systems. (This program--not contained in this document--allows the user to design a room of any shape with maximum dimensions of 14 x 26 feet.) Part A describes the program in terms of subject area (furniture arrangement) and hardware…

  2. 29 CFR Appendix D to Subpart L of... - Availability of Publications Incorporated by Reference in Section 1910.156 Fire Brigades

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Research Office, Washington, D.C. 20230. The referenced publications (or a microfiche of the publications) are available for review at many universities and public libraries throughout the country. These publications may also be examined at the OSHA Technical Data Center, Room N2439-Rear, United States Department...

  3. 75 FR 23759 - Frequency Regulation Compensation in the Organized Wholesale Power Markets; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD10-11-000] Frequency... Meeting Room at the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. All...-Federal Reporters, Inc. (202-347-3700 or 1-800-336-6646). The transcripts will be available for free on...

  4. 78 FR 63500 - Bureau of Labor Statistics Technical Advisory Committee; Notice of Meeting and Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... meet on Friday, November 8, 2013. The meeting will be held in the Postal Square Building, 2... held in rooms 1 and 2 of the Postal Square Building Conference Center. The schedule and agenda for the.... Individuals who require special accommodations should contact Ms. Fieldhouse at least two days prior to the...

  5. Making Room for Foster Children: A Criterion-Referenced Approach to ESEA Title I Migrant Program Evaluation.

    ERIC Educational Resources Information Center

    Oxford, Rebecca L.; And Others

    The Washington state Title I Migrant Program Evaluation project is a feasibility study designed to assess the suitability of existing normed criterion referenced tests to measuring mathematics achievement at grades four, five, and six. Objectives include judging the technical qualities and content of several normed criterion referenced tests;…

  6. A system to simulate and reproduce audio-visual environments for spatial hearing research.

    PubMed

    Seeber, Bernhard U; Kerber, Stefan; Hafter, Ervin R

    2010-02-01

    The article reports the experience gained from two implementations of the "Simulated Open-Field Environment" (SOFE), a setup that allows sounds to be played at calibrated levels over a wide frequency range from multiple loudspeakers in an anechoic chamber. Playing sounds from loudspeakers in the free-field has the advantage that each participant listens with their own ears, and individual characteristics of the ears are captured in the sound they hear. This makes an easy and accurate comparison between various listeners with and without hearing devices possible. The SOFE uses custom calibration software to assure individual equalization of each loudspeaker. Room simulation software creates the spatio-temporal reflection pattern of sound sources in rooms which is played via the SOFE loudspeakers. The sound playback system is complemented by a video projection facility which can be used to collect or give feedback or to study auditory-visual interaction. The article discusses acoustical and technical requirements for accurate sound playback against the specific needs in hearing research. An introduction to software concepts is given which allow easy, high-level control of the setup and thus fast experimental development, turning the SOFE into a "Swiss army knife" tool for auditory, spatial hearing and audio-visual research. Crown Copyright 2009. Published by Elsevier B.V. All rights reserved.

  7. A System to Simulate and Reproduce Audio-Visual Environments for Spatial Hearing Research

    PubMed Central

    Seeber, Bernhard U.; Kerber, Stefan; Hafter, Ervin R.

    2009-01-01

    The article reports the experience gained from two implementations of the “Simulated Open-Field Environment” (SOFE), a setup that allows sounds to be played at calibrated levels over a wide frequency range from multiple loudspeakers in an anechoic chamber. Playing sounds from loudspeakers in the free-field has the advantage that each participant listens with their own ears, and individual characteristics of the ears are captured in the sound they hear. This makes an easy and accurate comparison between various listeners with and without hearing devices possible. The SOFE uses custom calibration software to assure individual equalization of each loudspeaker. Room simulation software creates the spatio-temporal reflection pattern of sound sources in rooms which is played via the SOFE loudspeakers. The sound playback system is complemented by a video projection facility which can be used to collect or give feedback or to study auditory-visual interaction. The article discusses acoustical and technical requirements for accurate sound playback against the specific needs in hearing research. An introduction to software concepts is given which allow easy, high-level control of the setup and thus fast experimental development, turning the SOFE into a “Swiss army knife” tool for auditory, spatial hearing and audio-visual research. PMID:19909802

  8. Conception, realization and qualification of a radioactive clean room lab facility dedicated to the synthesis of radiolabeled API for human ADME studies.

    PubMed

    Loewe, Claudia; Atzrodt, Jens; Reschke, Kai; Schofield, Joe

    2016-12-01

    The human absorption, distribution, metabolism and elimination study administering radiolabeled drugs to human volunteers is an important clinical study in the development program of new drug candidates. The manufacture of radiolabeled Active Pharmaceutical Ingredients is covered by national drug laws and may come within the scope of regulatory GMP requirements. Additionally, authorities may request an appropriate environmental zoning to minimize the risk of microbiological contaminations particularly during the synthesis of radiolabeled Active Pharmaceutical Ingredients intended for parenteral application. Thus, a radioactive clean room lab facility in line with both GMP and radiation safety regulations was installed and the environmental zoning validated by appropriate testing of technical parameters and microbial and particle monitoring. The considerations detailed in this paper cover only GMP aspects related to the synthesis of radioactive drug substance. The subsequent, final formulation step in the overall process for manufacturing of radioactive drug product for any kind of administration is not within the scope of this paper. Under these qualified and controlled environmental conditions, we are now in a position to provide radiolabeled drug substances for all kinds of drug administration including both po and iv. Copyright © 2016 John Wiley & Sons, Ltd.

  9. An intervention for noise control of blast furnace in steel industry.

    PubMed

    Golmohammadi, Rostam; Giahi, Omid; Aliabadi, Mohsen; Darvishi, Ebrahim

    2014-01-01

    Noise pollution is currently a major health risk factor for workers in industries. The aim of this study was to investigate noise pollution and implement a control intervention plan for blast furnace in a steel industry. The measurement of sound pressure level (SPL) along with frequency analysis was done with the sound-level-meter Cell-450. Personal noise exposure was performed using dosimeter TES-1345 calibrated with CEL-282. Before planning noise controls, acoustic insulation properties of the furnace control unit and workers' rest room were assessed. Control room and workers' rest room were redesigned in order to improve acoustical condition. The SPL before intervention around the Blast Furnace was 90.3 dB (L) and its dominant frequency was 4000 Hz. Besides, noise transmission loss of the control and rest rooms were 10.3 dB and 4.2 dB, respectively. After intervention, noise reduction rates in the control and rest rooms were 27.4 dB and 27.7 dB, respectively. The workers' noise dose before and after the intervention was 240% and less than 100%, respectively. Improvement the workroom acoustic conditions through noise insulation can be considered effective method for preventing workers exposure to harmful noise.

  10. A field demonstration of energy conservation using occupancy sensor lighting control in equipment rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dagle, J.E.

    1992-09-01

    The Pacific Northwest Laboratory identified energy savings potential of automatic equipment-room lighting controls, which was demonstrated by the field experiment described in this report. Occupancy sensor applications have gained popularity in recent years due to improved technology that enhances reliability and reduces cost. Automatic lighting control using occupancy sensors has been accepted as an energy-conservation measure because it reduces wasted lighting. This study focused on lighting control for equipment rooms, which have inherent conditions ideal for automatic lighting control, i.e., an area which is seldom occupied, multiple users of the area who would not know if others are in themore » room when they leave, and high lighting energy intensity in the area. Two rooms were selected for this study: a small equipment room in the basement of the 337 Building, and a large equipment area in the upper level of the 329 Building. The rooms were selected to demonstrate the various degrees of complexity which may be encountered in equipment rooms throughout the Hanford Site. The 337 Building equipment-room test case demonstrated a 97% reduction in lighting energy consumption, with an annual energy savings of $184. Including lamp-replacement savings, a total savings of $306 per year is offset by an initial installation cost of $1,100. The installation demonstrates a positive net present value of $2,858 when the lamp-replacement costs are included in a life-cycle analysis. This also corresponds to a 4.0-year payback period. The 329 Building equipment-room installation resulted in a 92% reduction in lighting energy consumption. This corresponds to annual energy savings of $1,372, and a total annual savings of $2,104 per year including lamp-replacement savings. The life-cycle cost analysis shows a net present value of $15,855, with a 5.8-year payback period.« less

  11. 27. Pump Room interiorDrainage pump motor control center with main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Pump Room interior-Drainage pump motor control center with main valve control panel at right. - Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco, San Francisco County, CA

  12. 31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. INTERIOR VIEW TO THE SOUTHWEST OF A THIRD CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  13. 30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. INTERIOR VIEW TO THE WEST OF A SECOND CONTROL PANEL IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  14. Front view of bldg 30 which houses mission control

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Front view of bldg 30 which houses mission control. A shift change for the 41-D mission is underway. The windowless wing at left houses three floors, including rooms supporting flight control room 1 and 2.

  15. 11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  16. 12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  17. Atmospheric Tracer Depletion Testing for Unfiltered Air In-Leakage Determination at the Wolf Creek Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, T. M.; Wilke, R. J.; Roberts, T.

    Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building. The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference. Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test. The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less

  18. Atmospheric Tracer Depletion Testing for Unfiltered Air In-Leakage Determination at the Wolf Creek Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, T. M.; Wilke, R. J.; Roberts, T.

    Atmospheric Tracer Depletion tests were conducted at the Wolf Creek Nuclear Power Plant to quantify the unfiltered in-leakage (UI) into the Control Room (CR), Control Building (CB), and Equipment Rooms (ER) at the Wolf Creek Nuclear Power Plant. Wolf Creek has two independent charcoal filter Emergency Ventilation Systems (EVS) that can be used to purify air entering the control building and control room. The Bravo System contains a filtration system in Room 1501 in the Auxiliary Building for the Control Room and another filtration system (FGK02B) on Elevation 2016 for the Control Building. The Alpha system contains a filtration systemmore » in Room 1512 in the Auxiliary Building for the Control Room and another filtration system (FGK02A) on Elevation 2016 for the Control Building.The Atmospheric Tracer Depletion (ATD) test is a technique to measure in-leakage using the concentration of perfluorocarbon compounds that have a constant atmospheric background. These levels are present in the Control Room and Control Building under normal operating conditions. When air is supplied by either of the EVS, most of the PFTS are removed by the charcoal filters. If the concentrations of the PFTs measured in protected areas are the same as the levels at the output of the EVS, the in-leakage of outside air into the protected area would be zero. If the concentration is higher in the protected area than at the output of the filter system, there is in-leakage and the in-leakage can be quantified by the difference.Sampling was performed using state-of-the-art Brookhaven Atmospheric Tracer Samplers (BATS) air sampling equipment and analysis performed on Brookhaven National Laboratory (BNL) dedicated PFT analytical systems. In the Alpha test two tracers PMCH and mcPDCH were used to determine in-leakage into the control building. The analytical system was tuned to maximize sensitivity after initial analysis of the Alpha test. The increased sensitivity permitted accurate quantification of five isomers of the PFT PDCH (mtPDCH, pcPDCH, otPDCH, mcPDCH, and ptPDCH). These isomers were quantified in the low concentration samples in the Alpha test and in all samples in the Bravo test.The best estimates of UI (Rui) for the four zones are provided in Table ES-1. For the CB, this estimate averages the four tracers at the four elevations. For the CR, this estimate uses the four sampling units located in the Control Room.« less

  19. 49. Environmental equipment room, cbr filter at left, ventilation control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Environmental equipment room, cbr filter at left, ventilation control panel in center, brine chiller controls at right, looking southeast - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  20. Documentation of new mission control center White Flight Control Room (FLCR)

    NASA Image and Video Library

    1995-06-06

    Documentation of the new mission control center White Flight Control Room (FLCR). Excellent overall view of White FLCR with personnel manning console workstations (11221). Fisheye lens perspective from Flight Director station with Brian Austin (11222). Environmental (EECOM) workstation and personnel (11223).

  1. Nursing staff's experiences of working in an evidence-based designed ICU patient room-An interview study.

    PubMed

    Sundberg, Fredrika; Olausson, Sepideh; Fridh, Isabell; Lindahl, Berit

    2017-12-01

    It has been known for centuries that environment in healthcare has an impact, but despite this, environment has been overshadowed by technological and medical progress, especially in intensive care. Evidence-based design is a concept concerning integrating knowledge from various research disciplines and its application to healing environments. The aim was to explore the experiences of nursing staff of working in an evidence-based designed ICU patient room. Interviews were carried out with eight critical care nurses and five assistant nurses and then subjected to qualitative content analysis. The experience of working in an evidence-based designed intensive care unit patient room was that the room stimulates alertness and promotes wellbeing in the nursing staff, fostering their caring activities but also that the interior design of the medical and technical equipment challenges nursing actions. The room explored in this study had been rebuilt in order to create and evaluate a healing environment. This study showed that the new environment had a great impact on the caring staffs' wellbeing and their caring behaviour. At a time when turnover in nurses is high and sick leave is increasing, these findings show the importance of interior design ofintensive care units. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. An integrated system for dynamic control of auditory perspective in a multichannel sound field

    NASA Astrophysics Data System (ADS)

    Corey, Jason Andrew

    An integrated system providing dynamic control of sound source azimuth, distance and proximity to a room boundary within a simulated acoustic space is proposed for use in multichannel music and film sound production. The system has been investigated, implemented, and psychoacoustically tested within the ITU-R BS.775 recommended five-channel (3/2) loudspeaker layout. The work brings together physical and perceptual models of room simulation to allow dynamic placement of virtual sound sources at any location of a simulated space within the horizontal plane. The control system incorporates a number of modules including simulated room modes, "fuzzy" sources, and tracking early reflections, whose parameters are dynamically changed according to sound source location within the simulated space. The control functions of the basic elements, derived from theories of perception of a source in a real room, have been carefully tuned to provide efficient, effective, and intuitive control of a sound source's perceived location. Seven formal listening tests were conducted to evaluate the effectiveness of the algorithm design choices. The tests evaluated: (1) loudness calibration of multichannel sound images; (2) the effectiveness of distance control; (3) the resolution of distance control provided by the system; (4) the effectiveness of the proposed system when compared to a commercially available multichannel room simulation system in terms of control of source distance and proximity to a room boundary; (5) the role of tracking early reflection patterns on the perception of sound source distance; (6) the role of tracking early reflection patterns on the perception of lateral phantom images. The listening tests confirm the effectiveness of the system for control of perceived sound source distance, proximity to room boundaries, and azimuth, through fine, dynamic adjustment of parameters according to source location. All of the parameters are grouped and controlled together to create a perceptually strong impression of source location and movement within a simulated space.

  3. KSC-06pd0545

    NASA Image and Video Library

    2006-03-24

    KENNEDY SPACE CENTER, FLA. -- Kennedy Space Center Deputy Director Bill Parsons explains the significance of the Operations Support Building II (behind him) to guests at the ribbon-cutting ceremony. The Operations Support Building II is an Agency safety and health initiative project to replace 198,466 square feet of substandard modular housing and trailers in the Launch Complex 39 area at Kennedy Space Center. The five-story building, which sits south of the Vehicle Assembly Building and faces the launch pads, includes 960 office spaces, 16 training rooms, computer and multimedia conference rooms, a Mission Conference Center with an observation deck, technical libraries, an Exchange store, storage, break areas, and parking. Photo credit: NASA/George Shelton

  4. KSC-2014-1969

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  5. KSC-2014-1970

    NASA Image and Video Library

    2014-04-03

    CAPE CANAVERAL, Fla. – Three rows of upper level management consoles are all that remain in Firing Room 4 in the Launch Control Center at NASA’s Kennedy Space Center in Florida. The main floor consoles, cabling and wires below the floor and ceiling tiles above have been removed. The Ground Systems Development and Operations Program is overseeing efforts to create a new firing room based on a multi-user concept that will support NASA and commercial launch needs. The design of Firing Room 4 will incorporate five control room areas that are flexible to meet current and future NASA and commercial user requirements. The equipment and most of the consoles from Firing Room 4 were moved to Firing Room 2 for possible future reuse. Photo credit: NASA/Ben Smegelsky

  6. 11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along west wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  7. 29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. INTERIOR VIEW TO THE NORTHEAST OF CONTROL PANEL AND VIEWING WINDOW IN ROOM 105, THE CONTROL ROOM. - Nevada Test Site, Pluto Facility, Disassembly Building, Area 26, Wahmonie Flats, Cane Spring Road, Mercury, Nye County, NV

  8. 8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  9. LOFT. Interior, control room in control building (TAN630). Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOFT. Interior, control room in control building (TAN-630). Camera facing north. Sign says "This control console is partially active. Do not operate any switch handle without authorization." Date: May 2004. INEEL negative no. HD-39-14-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  10. 14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN STATION MANAGER'S CONTROL DESK. ELECTRICAL CONTROL INDICATORS AND CONTROLS FOR REGULATING ELECTRICITY INTO PLANT AS WELL AS SYNCHRONIZING STARTUP OF PUMPS. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  11. Information Foraging in Nuclear Power Plant Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R.L. Boring

    2011-09-01

    nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators tomore » appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.« less

  12. Indoor radon levels in selected hot spring hotels in Guangdong, China.

    PubMed

    Song, Gang; Zhang, Boyou; Wang, Xinming; Gong, Jingping; Chan, Daniel; Bernett, John; Lee, S C

    2005-03-01

    Guangdong is one of the provinces that have most hot springs in China, and many hotels have been set up near hot springs, with spring water introduced into the bath inside each hotel room for hot spring bathing to attract tourists. In the present study, we measured radon in indoor and outdoor air, as well as in hot spring waters, in four hot spring hotels in Guangdong by using NR-667A (III) continuous radon detector. Radon concentrations ranged 53.4-292.5 Bq L(-1) in the hot spring water and 17.2-190.9 Bq m(-3) in outdoor air. Soil gas intrusion, indoor hot spring water use and inefficient ventilation all contributed to the elevated indoor radon levels in the hotel rooms. From the variation of radon levels in closed unoccupied hotel rooms, soil gas intrusion was found to be a very important source of indoor radon in hotel rooms with floors in contact with soils. When there was spring water bathing in the bathes, average radon levels were 10.9-813% higher in the hotel rooms and 13.8-489% higher in bathes compared to their corresponding average levels when there was no spring water use. Spring water use in the hotel rooms had radon transfer coefficients from 1.6x10(-4) to 5.0x10(-3). Radon in some hotel rooms maintained in concentrations much higher than guideline levels might thus have potential health risks to the hotel workers, and technical and management measures should be taken to lower their exposure of radon through inhalation.

  13. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; Ronald Boring; Lew Hanes

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.« less

  14. 6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape tunnel. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  15. 7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner and entrance to cable tunnel. - Edwards Air Force Base, South Base Sled Track, Firing Control Blockhouse, South of Sled Track at east end, Lancaster, Los Angeles County, CA

  16. 10 CFR 36.23 - Access control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...

  17. 10 CFR 36.23 - Access control.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...

  18. 10 CFR 36.23 - Access control.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Access control. 36.23 Section 36.23 Energy NUCLEAR... Requirements for Irradiators § 36.23 Access control. (a) Each entrance to a radiation room at a panoramic... radiation room at a panoramic irradiator must have an independent backup access control to detect personnel...

  19. Wide angle view of the Flight control room of Mission control center

    NASA Image and Video Library

    1984-10-06

    Wide angle view of the flight control room (FCR) of the Mission Control Center (MCC). Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.

  20. Sound-field reproduction in-room using optimal control techniques: simulations in the frequency domain.

    PubMed

    Gauthier, Philippe-Aubert; Berry, Alain; Woszczyk, Wieslaw

    2005-02-01

    This paper describes the simulations and results obtained when applying optimal control to progressive sound-field reproduction (mainly for audio applications) over an area using multiple monopole loudspeakers. The model simulates a reproduction system that operates either in free field or in a closed space approaching a typical listening room, and is based on optimal control in the frequency domain. This rather simple approach is chosen for the purpose of physical investigation, especially in terms of sensing microphones and reproduction loudspeakers configurations. Other issues of interest concern the comparison with wave-field synthesis and the control mechanisms. The results suggest that in-room reproduction of sound field using active control can be achieved with a residual normalized squared error significantly lower than open-loop wave-field synthesis in the same situation. Active reproduction techniques have the advantage of automatically compensating for the room's natural dynamics. For the considered cases, the simulations show that optimal control results are not sensitive (in terms of reproduction error) to wall absorption in the reproduction room. A special surrounding configuration of sensors is introduced for a sensor-free listening area in free field.

  1. Microcontroller based automatic temperature control for oyster mushroom plants

    NASA Astrophysics Data System (ADS)

    Sihombing, P.; Astuti, T. P.; Herriyance; Sitompul, D.

    2018-03-01

    In the cultivation of Oyster Mushrooms need special treatment because oyster mushrooms are susceptible to disease. Mushroom growth will be inhibited if the temperature and humidity are not well controlled because temperature and inertia can affect mold growth. Oyster mushroom growth usually will be optimal at temperatures around 22-28°C and humidity around 70-90%. This problem is often encountered in the cultivation of oyster mushrooms. Therefore it is very important to control the temperature and humidity of the room of oyster mushroom cultivation. In this paper, we developed an automatic temperature monitoring tool in the cultivation of oyster mushroom-based Arduino Uno microcontroller. We have designed a tool that will control the temperature and humidity automatically by Android Smartphone. If the temperature increased more than 28°C in the room of mushroom plants, then this tool will turn on the pump automatically to run water in order to lower the room temperature. And if the room temperature of mushroom plants below of 22°C, then the light will be turned on in order to heat the room. Thus the temperature in the room oyster mushrooms will remain stable so that the growth of oyster mushrooms can grow with good quality.

  2. Dismantling the nuclear research reactor Thetis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michiels, P.

    The research reactor Thetis, in service since 1967 and stopped in 2003, is part of the laboratories of the institution of nuclear science of the University of Ghent. The reactor, of the pool-type, was used as a neutron-source for the production of radio-isotopes and for activation analyses. The reactor is situated in a water pool with inner diameter of 3 m. and a depth of 7.5 m. The reactor core is situated 5.3 m under water level. Besides the reactor, the pool contains pneumatic loops, handling tools, graphite blocks for neutron moderation and other experimental equipment. The building houses storagemore » rooms for fissile material and sources, a pneumatic circuit for transportation of samples, primary and secondary cooling circuits, water cleaning resin circuits, a ventilation system and other necessary devices. Because of the experimental character of the reactor, laboratories with glove boxes and other tools were needed and are included in the dismantling program. The building is in 3 levels with a crawl-space. The ground-floor contains the ventilation installation, the purification circuits with tanks, cooling circuits and pneumatic transport system. On the first floor, around the reactor hall, the control-room, visiting area, end-station for pneumatic transport, waste-storage room, fuel storage room and the labs are located. The second floor contains a few laboratories and end stations of the two high speed transfer tubes. The lowest level of the pool is situated under ground level. The reactor has been operated at a power of 150 kW and had a max operating power of 250 kW. Belgoprocess has been selected to decommission the reactor, the labs, storage halls and associated circuits to free release the building for conventional reuse and for the removal of all its internals as legal defined. Besides the dose-rate risk and contamination risk, there is also an asbestos risk of contamination. During construction of the installation, asbestos-containing materials were used, which must be removed in controlled conditions. The ventilation system is considered free from nuclear contamination but it contains asbestos. This paper covers the organization of the dismantling work, the technical execution aspect and conclusions already known (dismantling is ongoing as this is written). (authors)« less

  3. Final Environmental Planning Technical Report. Land Use

    DTIC Science & Technology

    1984-01-01

    COLLEGE RECREATIONAL FACILITIES Recreational Facilities Number Indoor Facilities Gym (Basketball, Volleyball) 1 Weight Room 1 Handball /Racquetball...Clubs/Gymnasiums 4 YMCA Gloria Stevens Figure Salon Nautilus Fitness Center Rocky Mountain Health Club 10 handball /racquetball courts, swimming pool, gym...Range I Roller Rink 1 Indoor Handball /Racquetball Courts 5 Indoor Softball Diamonds 3 Lighted Picnic Tables 14 Youth Baseball Diamonds 5 Tennis Courts

  4. 75 FR 75186 - Interview Room Video System Standard Special Technical Committee Request for Proposals for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-02

    ... anticipated that the STC members will participate in six 2-day meetings over a 12-month time period with the... anticipated that STC meetings will begin in January 2011. Travel expenses and per diem will be reimbursed for all STC meetings; however, participation time will not be funded. NIJ is seeking representatives from...

  5. The Development of a Token Reinforcement System for a Specific Lesson. Technical Report #11.

    ERIC Educational Resources Information Center

    Au, Kathryn

    This paper presents a brief description of a token reinforcement system developed for a kindergarten language class in the Kamehameha Early Education Program (KEEP). Visual reinforcers (colored plastic tabs) were placed next to the names of individual children (each time they made a correct response) on a large chart in the front of the room. Five…

  6. 77 FR 4986 - Inviting Rural Business Enterprise Grant Program Applications for Grants To Provide Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... 56, Room 2300, P.O. Box 25426, Denver, CO 80225-0426, (720) 544- 2903/TDD (800) 659-3656. Delaware... Place, P.O. Box 147010, Gainesville, FL 32614-7010, (352) 338-3400/TDD (352) 338- 3499. Georgia USDA... (318) 473-7655. Maine USDA Rural Development State Office, 967 Illinois Avenue, Suite 4, P.O. Box 405...

  7. Room Clerk (hotel and rest.) 1-07.60--Technical Report on Standardization of the General Aptitude Test Battery.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.

    The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…

  8. Observation and Coding Manual for the Longitudinal Study of Reading Comprehension and Science Concept Acquisition (Third Edition). Technical Report No. L-1.

    ERIC Educational Resources Information Center

    Meyer, Linda A.; And Others

    This manual describes the model--specifically the observation procedures and coding systems--used in a longitudinal study of how children learn to comprehend what they read, with particular emphasis on science texts. Included are procedures for the following: identifying students; observing--recording observations and diagraming the room; writing…

  9. Comprehensive Training Curricula for Minimally Invasive Surgery

    PubMed Central

    Palter, Vanessa N

    2011-01-01

    Background The unique skill set required for minimally invasive surgery has in part contributed to a certain portion of surgical residency training transitioning from the operating room to the surgical skills laboratory. Simulation lends itself well as a method to shorten the learning curve for minimally invasive surgery by allowing trainees to practice the unique motor skills required for this type of surgery in a safe, structured environment. Although a significant amount of important work has been done to validate simulators as viable systems for teaching technical skills outside the operating room, the next step is to integrate simulation training into a comprehensive curriculum. Objectives This narrative review aims to synthesize the evidence and educational theories underlining curricula development for technical skills both in a broad context and specifically as it pertains to minimally invasive surgery. Findings The review highlights the critical aspects of simulation training, such as the effective provision of feedback, deliberate practice, training to proficiency, the opportunity to practice at varying levels of difficulty, and the inclusion of both cognitive teaching and hands-on training. In addition, frameworks for integrating simulation training into a comprehensive curriculum are described. Finally, existing curricula on both laparoscopic box trainers and virtual reality simulators are critically evaluated. PMID:22942951

  10. STS-109 Flight Control Room Photo

    NASA Image and Video Library

    2002-03-05

    JSC2002-00575 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houston’s Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.

  11. STS-109 Flight Control Room Photo

    NASA Image and Video Library

    2002-03-05

    JSC2002-00576 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houston’s Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.

  12. APPLICATION OF EYE TRACKING FOR MEASUREMENT AND EVALUATION IN HUMAN FACTORS STUDIES IN CONTROL ROOM MODERNIZATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kovesdi, C.; Spielman, Z.; LeBlanc, K.

    An important element of human factors engineering (HFE) pertains to measurement and evaluation (M&E). The role of HFE-M&E should be integrated throughout the entire control room modernization (CRM) process and be used for human-system performance evaluation and diagnostic purposes with resolving potential human engineering deficiencies (HEDs) and other human machine interface (HMI) design issues. NUREG-0711 describes how HFE in CRM should employ a hierarchical set of measures, particularly during integrated system validation (ISV), including plant performance, personnel task performance, situation awareness, cognitive workload, and anthropometric/ physiological factors. Historically, subjective measures have been primarily used since they are easier to collectmore » and do not require specialized equipment. However, there are pitfalls with relying solely on subjective measures in M&E such that negatively impact reliability, sensitivity, and objectivity. As part of comprehensively capturing a diverse set of measures that strengthen findings and inferences made of the benefits from emerging technologies like advanced displays, this paper discusses the value of using eye tracking as an objective method that can be used in M&E. A brief description of eye tracking technology and relevant eye tracking measures is provided. Additionally, technical considerations and the unique challenges with using eye tracking in full-scaled simulations are addressed. Finally, this paper shares preliminary findings regarding the use of a wearable eye tracking system in a full-scale simulator study. These findings should help guide future full-scale simulator studies using eye tracking as a methodology to evaluate human-system performance.« less

  13. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  14. 26. A typical outer rod room, or rack room, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. A typical outer rod room, or rack room, showing the racks for the nine horizontal control rods (HCRs) that would be inserted or withdrawn from the pile to control the rate of reaction. In this case, it is the 105-F Reactor in February 1945. The view is looking away from the pile, which is out of the picture on the left. Several of the cooling water hose reels for the rods can be seen at the end of the racks near the wall. D-8323 - B Reactor, Richland, Benton County, WA

  15. Closed-Loop Acoustic Control of Reverberant Room for Satellite Environmental Testing

    NASA Astrophysics Data System (ADS)

    Janssens, Karl; Bianciardi, Fabio; Sabbatini, Danilo; Debille, Jan; Carrella, Alex

    2012-07-01

    The full satellite acoustic test is an important milestone in a satellite launch survivability verification campaign. This test is required to verify the satellite’s mechanical design against the high-level acoustic loads induced by the launch vehicle during the atmospheric flight. During the test, the satellite is subjected to a broadband diffuse acoustic field, reproducing the pressure levels observed during launch. The excitation is in most cases provided by a combination of horns for the low frequencies and noise generators for the higher frequencies. Acoustic control tests are commonly performed in reverberant rooms, controlling the sound pressure levels in third octave bands over the specified target spectrum. This paper discusses an automatic feedback control system for acoustic control of large reverberation rooms for satellite environmental testing. The acoustic control system consists of parallel third octave PI (Proportional Integral) feedback controllers that take the reverberation characteristics of the room into consideration. The drive output of the control system is shaped at every control step based on the comparison of the average third octave noise spectrum, measured from a number of microphones in the test room, with the target spectrum. Cross-over filters split the output drive into band- limited signals to feed each of the horns. The control system is realized in several steps. In the first phase, a dynamic process model is developed, including the non-linear characteristics of the horns and the reverberant properties of the room. The model is identified from dynamic experiments using system identification techniques. In the next phase, an adequate control strategy is designed which is capable of reaching the target spectrum in the required time period without overshoots. This control strategy is obtained from model-in-the-loop (MIL) simulations, evaluating the performance of various potential strategies. Finally, the proposed strategy is implemented in real-time and its control performance tested and validated.

  16. Clean room survey and assessment, volume 5, appendix H

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The scope of this task is to perform a comparative analysis of the various Environmental Control Life Support System (ECLSS) options for different growth scenarios. The Space Station Freedom ECLSS design and existing ground-based clean room facilities are used as a baseline for comparison. Specifically addressed here are the ground based clean room facilities at the Marshall Space Flight Center (MSFC). Given here is an evaluation of the facilities, equipment, technologies, and procedures used to maintain specified environments in typical aerospace industrial areas. Twenty-five specific clean rooms are evaluated. The objectives were to collect, compare, and catalog data for each specified facility in the areas of engineering and design, construction materials, work stations, contamination control, particulate elimination, entry systems, and instrumentation, and to make recommendations concerning enhancements required to assure an efficient and orderly evolution of MSFC clean room environmental control facilities.

  17. Flame Retardant Chemicals in College Dormitories: Flammability Standards Influence Dust Concentrations.

    PubMed

    Dodson, Robin E; Rodgers, Kathryn M; Carey, Gale; Cedeno Laurent, Jose Guillermo; Covaci, Adrian; Poma, Giulia; Malarvannan, Govindan; Spengler, John D; Rudel, Ruthann A; Allen, Joseph G

    2017-05-02

    Furniture flammability standards are typically met with chemical flame retardants (FRs). FRs can migrate out of products into dust and are linked to cancer, neurological impairment, and endocrine disruption. We collected 95 dust samples from dormitory common areas and student rooms on two U.S. college campuses adhering to two different furniture flammability standards: Technical Bulletin 117 (TB117) and Technical Bulletin 133 (TB133). Because TB133 requires furniture to withstand a much-more-demanding test flame than TB117, we hypothesized that spaces with TB133 furniture would have higher levels of FRs in dust. We found all 47 targeted FRs, including 12 polybrominated diphenyl ether (PBDE) congeners, 19 other brominated FRs, 11 phosphorus FRs (PFRs), 2 Dechlorane-Plus (DP) isomers, and 3 hexabromocyclododecane (HBCDD) isomers in the 95 dust samples. We measured the highest reported U.S. concentrations for a number of FRs, including BDE 209 (up to 990 000 ng/g), which may be used to meet the TB133 standard. We prioritized 16 FRs and analyzed levels in relation to flammability standard as well as presence and age of furniture and electronics. Adherence to TB133 was associated with higher concentrations of BDE 209, decabromodiphenylethane (DBDPE), DPs, and HBCDD compared to adherence to TB117 in univariate models (p < 0.05). Student dormitory rooms tended to have higher levels of some FRs compared to common rooms, likely a result of the density of furniture and electronics. As flammability standards are updated, it is critical to understand their impact on exposure and health risks.

  18. Human factors aspects of control room design

    NASA Technical Reports Server (NTRS)

    Jenkins, J. P.

    1983-01-01

    A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.

  19. IET. Control room in control building (TAN620). Terminal panels for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET. Control room in control building (TAN-620). Terminal panels for instrumentation wiring. Note alarm horn and emergency light at right edge of view. Cable reel comes from Collier, Pawtucket, RI. Date: February 1955. INEEL negative no. 55-362 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  20. Guidelines on ergonomic aspects of control rooms

    NASA Technical Reports Server (NTRS)

    Mitchell, C. M.; Bocast, A. K.; Stewart, L. J.

    1983-01-01

    The anthropometry, workstation design, and environmental design of control rooms are outlined. The automated interface and VDTs and displays and various modes of communication between the system and the human operator using VDTs are discussed. The man in the loop is examined, the single controller single task framework and multiple controller multiple tasks issues are considered.

  1. Report: EPA’s Office of Environmental Information Should Improve Ariel Rios and Potomac Yard Computer Room Security Controls

    EPA Pesticide Factsheets

    Report #12-P-0879, September 26, 2012. The security posture and in-place environmental control review of the computer rooms in the Ariel Rios and Potomac Yard buildings revealed numerous security and environmental control deficiencies.

  2. 20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. THE BUILDING 371/374 COMPLEX WAS DESIGNED TO EMPHASIZE AUTOMATICALLY CONTROLLED, REMOTELY OPERATED PROCESSES. (1/80) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  3. The heat is on: room temperature affects laboratory equipment--an observational study.

    PubMed

    Butler, Julia M; Johnson, Jane E; Boone, William R

    2013-10-01

    To evaluate the effect of ambient room temperature on equipment typically used in in vitro fertilization (IVF). We set the control temperature of the room to 20 °C (+/-0.3) and used CIMScan probes to record temperatures of the following equipment: six microscope heating stages, four incubators, five slide warmers and three heating blocks. We then increased the room temperature to 26 °C (+/-0.3) or decreased it to 17 °C (+/-0.3) and monitored the same equipment again. We wanted to determine what role, if any, changing room temperature has on equipment temperature fluctuation. There was a direct relationship between room temperature and equipment temperature stability. When room temperature increased or decreased, equipment temperature reacted in a corresponding manner. Statistical differences between equipment were found when the room temperature changed. What is also noteworthy is that temperature of equipment responded within 5 min to a change in room temperature. Clearly, it is necessary to be aware of the affect of room temperature on equipment when performing assisted reproductive procedures. Room and equipment temperatures should be monitored faithfully and adjusted as frequently as needed, so that consistent culture conditions can be maintained. If more stringent temperature control can be achieved, human assisted reproduction success rates may improve.

  4. KSC-2009-2975

    NASA Image and Video Library

    2009-05-06

    CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller

  5. KSC-2009-2976

    NASA Image and Video Library

    2009-05-06

    CAPE CANAVERAL, Fla. – New windows are installed in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller

  6. 37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING TOWARDS STERN, PORT ENGINE AT RIGHT, STARBOARD ENGINE AT LEFT, BOTH ARE DIESEL ENGINES, IN BACKGROUND IS STAIRS UP TO CREWS' BERTHING, BEYONE THE STAIRS IS THE DOOR TO AFT ENGINE ROOM & MACHINE SHOP. - U.S. Coast Guard Cutter WHITE HEATH, USGS Integrated Support Command Boston, 427 Commercial Street, Boston, Suffolk County, MA

  7. Assessing neurosurgical non-technical skills: an exploratory study of a new behavioural marker system.

    PubMed

    Michinov, Estelle; Jamet, Eric; Dodeler, Virginie; Haegelen, Claire; Jannin, Pierre

    2014-10-01

    The management of non-technical skills is a major factor affecting teamwork quality and patient safety. This article presents a behavioural marker system for assessing neurosurgical non-technical skills (BMS-NNTS). We tested the BMS during deep brain stimulation surgery. We developed the BMS in three stages. First, we drew up a provisional assessment tool based on the literature and observation tools developed for other surgical specialties. We then analysed videos made in an operating room (OR) during deep brain stimulation operations in order to ensure there were no significant omissions from the skills list. Finally, we used five videos of operations to identify the behavioural markers of non-technical skills in verbal communications. Analyses of more than six hours of observations revealed 3515 behaviours from which we determined the neurosurgeon's non-technical skills behaviour pattern. The neurosurgeon frequently engaged in explicit coordination, situation awareness and leadership behaviours. In addition, the neurosurgeon's behaviours differed according to the stage of the operation and the OR staff members with whom she was communicating. Our behavioural marker system provides a structured approach to assessing non-technical skills in the field of neurosurgery. It can also be transferred to other surgical specialties and used in surgeon training curricula. © 2014 John Wiley & Sons, Ltd.

  8. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  9. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  10. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  11. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  12. 30 CFR 57.4262 - Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground transformer stations, combustible... and Control Firefighting Equipment § 57.4262 Underground transformer stations, combustible liquid storage and dispensing areas, pump rooms, compressor rooms, and hoist rooms. Transformer stations, storage...

  13. 46 CFR 154.1200 - Mechanical ventilation system: General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...

  14. 46 CFR 154.1200 - Mechanical ventilation system: General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...

  15. 46 CFR 154.1200 - Mechanical ventilation system: General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Each cargo compressor room, pump room, gas-dangerous cargo control station, and space that contains... motors for cargo handling equipment. (2) Each gas-safe cargo control station in the cargo area. (3) Each...

  16. Staff acceptance of video monitoring for coordination: a video system to support perioperative situation awareness.

    PubMed

    Kim, Young Ju; Xiao, Yan; Hu, Peter; Dutton, Richard

    2009-08-01

    To understand staff acceptance of a remote video monitoring system for operating room (OR) coordination. Improved real-time remote visual access to OR may enhance situational awareness but also raises privacy concerns for patients and staff. Survey. A system was implemented in a six-room surgical suite to display OR monitoring video at an access restricted control desk area. Image quality was manipulated to improve staff acceptance. Two months after installation, interviews and a survey were conducted on staff acceptance of video monitoring. About half of all OR personnel responded (n = 63). Overall levels of concerns were low, with 53% rated no concerns and 42% little concern. Top two reported uses of the video were to see if cases are finished and to see if a room is ready. Viewing the video monitoring system as useful did not reduce levels of concern. Staff in supervisory positions perceived less concern about the system's impact on privacy than did those supervised (p < 0.03). Concerns for patient privacy correlated with concerns for staff privacy and performance monitoring. Technical means such as manipulating image quality helped staff acceptance. Manipulation of image quality resulted overall acceptance of monitoring video, with residual levels of concerns. OR nurses may express staff privacy concern in the form of concerns over patient privacy. This study provided suggestions for technological and implementation strategies of video monitoring for coordination use in OR. Deployment of communication technology and integration of clinical information will likely raise concerns over staff privacy and performance monitoring. The potential gain of increased information access may be offset by negative impact of a sense of loss of autonomy.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This final safety evaluation report (FSER) documents the technical review of the System 80+ standard design by the US Nuclear Regulatory Commission (NRC) staff. The application for the System 80+ design was submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE) as an application for design approval and subsequent design certification pursuant to 10 CFR {section} 52.45. System 80+ is a pressurized water reactor with a rated power of 3914 megawatts thermal (MWt) and a design power of 3992 MWt at which accidents are analyzed. Many features of the System 80+ are similar to those of Abb-CE`s Systemmore » 80 design from which it evolved. Unique features of the System 80+ design included: a large spherical, steel containment; an in-containment refueling water storage tank; a reactor cavity flooding system, hydrogen ignitors, and a safety depressurization system for severe accident mitigation; a combustion gas turbine for an alternate ac source; and an advanced digitally based control room. On the basis of its evaluation and independent analyses, the NRC staff concludes that ABB-CE`s application for design certification meets the requirements of Subpart B of 10 CFR Part 52 that are applicable and technically relevant to the System 80+ standard design. This document, Volume 1, contains Chapters 1 through 14 of this report.« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This final safety evaluation report (FSER) documents the technical review of the System 80+ standard design by the US Nuclear Regulatory Commission (NRC) staff. The application for the system 80+ design was submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE) as an application for design approval and subsequent design certification pursuant to 10 CFR {section} 52.45. System 80+ is a pressurized water reactor with a rated power of 3914 megawatts thermal (MWt) and a design power of 3992 MWt at which accidents are analyzed. Many features of the System 80+ are similar to those of ABB-CE`s Systemmore » 80 design from which it evolved. Unique features of the System 80+ design include: a large spherical, steel containment; an in-containment refueling water storage tank; a reactor cavity flooding system, hydrogen ignitors and a safety depressurization system for severe accident mitigation; a combustion gas turbine for an alternate ac source; and an advanced digitally based control room. On the basis of its evaluation and independent analyses, the NRC staff concludes that ABB-CE`s application for design certification meets the requirements of Subpart B of 10 CFR Part 52 that are applicable and technically relevant to the System 80+ standard design. This document, Volume 2, contains Chapters 15 through 22 and Appendices A through E.« less

  19. Impact of animal-assisted therapy for outpatients with fibromyalgia.

    PubMed

    Marcus, Dawn A; Bernstein, Cheryl D; Constantin, Janet M; Kunkel, Frank A; Breuer, Paula; Hanlon, Raymond B

    2013-01-01

    Animal-assisted therapy using dogs trained to be calm and provide comfort to strangers has been used as a complementary therapy for a range of medical conditions. This study was designed to evaluate the effects of brief therapy dog visits for fibromyalgia patients attending a tertiary outpatient pain management facility compared with time spent in a waiting room. Open label with waiting room control. Tertiary care, university-based, outpatient pain management clinic. A convenience sample of fibromyalgia patients was obtained through advertisements posted in the clinic. Participants were able to spend clinic waiting time with a certified therapy dog instead of waiting in the outpatient waiting area. When the therapy dog was not available, individuals remained in the waiting area. OUTCOME MEASURES.: Self-reported pain, fatigue, and emotional distress were recorded using 11-point numeric rating scales before and after the therapy dog visit or waiting room time. Data were evaluated from 106 therapy dog visits and 49 waiting room controls, with no significant between-group demographic differences in participants. Average intervention duration was 12 minutes for the therapy dog visit and 17 minutes for the waiting room control. Significant improvements were reported for pain, mood, and other measures of distress among patients after the therapy dog visit, but not the waiting room control. Clinically meaningful pain relief (≥2 points pain severity reduction) occurred in 34% after the therapy dog visit and 4% in the waiting room control. Outcome was not affected by the presence of comorbid anxiety or depression. Brief therapy dog visits may provide a valuable complementary therapy for fibromyalgia outpatients. Wiley Periodicals, Inc.

  20. KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  1. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  2. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  3. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  4. STS-118 Ascent/Entry Flight Control Team in White Flight Control Room (WFCR) with Flight Director Steve Stitch

    NASA Image and Video Library

    2007-07-20

    JSC2007-E-41011 (20 July 2007) --- STS-118 Ascent/Entry flight control team pose for a group portrait in the space shuttle flight control room of Houston's Mission Control Center (MCC). Flight director Steve Stich (center right) and astronaut Tony Antonelli, spacecraft communicator (CAPCOM), hold the STS-118 mission logo.

  5. Report: EPA’s Radiation and Indoor Environments National Laboratory Should Improve Its Computer Room Security Controls

    EPA Pesticide Factsheets

    Report #12-P-0847, September 21, 2012.Our review of the security posture and in-place environmental controls of EPA’s Radiation and Indoor Environments National Laboratory computer room disclosed an array of security and environmental control deficiencies.

  6. 28. SONAR CONTROL ROOM FORWARD LOOKING AFT SHOWING AN/SQS23G ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. SONAR CONTROL ROOM - FORWARD LOOKING AFT SHOWING AN/SQS-23G DETECTING-RANGING SET, MARK & CONTROL PANEL, CAN-55134 RECORDER, SPEED INDICATOR, VARIOUS ALARMS AND INTERNAL COMMUNICATION CIRCUITS. - U.S.S. HORNET, Puget Sound Naval Shipyard, Sinclair Inlet, Bremerton, Kitsap County, WA

  7. 31. Perimeter acquisition radar building room #318, data storage "racks"; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Perimeter acquisition radar building room #318, data storage "racks"; sign read: M&D controller, logic control buffer, data transmission controller - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  8. A survey on robotic devices for upper limb rehabilitation

    PubMed Central

    2014-01-01

    The existing shortage of therapists and caregivers assisting physically disabled individuals at home is expected to increase and become serious problem in the near future. The patient population needing physical rehabilitation of the upper extremity is also constantly increasing. Robotic devices have the potential to address this problem as noted by the results of recent research studies. However, the availability of these devices in clinical settings is limited, leaving plenty of room for improvement. The purpose of this paper is to document a review of robotic devices for upper limb rehabilitation including those in developing phase in order to provide a comprehensive reference about existing solutions and facilitate the development of new and improved devices. In particular the following issues are discussed: application field, target group, type of assistance, mechanical design, control strategy and clinical evaluation. This paper also includes a comprehensive, tabulated comparison of technical solutions implemented in various systems. PMID:24401110

  9. Verification and Implementation of Operations Safety Controls for Flight Missions

    NASA Technical Reports Server (NTRS)

    Jones, Cheryl L.; Smalls, James R.; Carrier, Alicia S.

    2010-01-01

    Approximately eleven years ago, the International Space Station launched the first module from Russia, the Functional Cargo Block (FGB). Safety and Mission Assurance (S&MA) Operations (Ops) Engineers played an integral part in that endeavor by executing strict flight product verification as well as continued staffing of S&MA's console in the Mission Evaluation Room (MER) for that flight mission. How were these engineers able to conduct such a complicated task? They conducted it based on product verification that consisted of ensuring that safety requirements were adequately contained in all flight products that affected crew safety. S&MA Ops engineers apply both systems engineering and project management principles in order to gain a appropriate level of technical knowledge necessary to perform thorough reviews which cover the subsystem(s) affected. They also ensured that mission priorities were carried out with a great detail and success.

  10. Mechanical gate control for atom-by-atom cluster assembly with scanning probe microscopy.

    PubMed

    Sugimoto, Yoshiaki; Yurtsever, Ayhan; Hirayama, Naoki; Abe, Masayuki; Morita, Seizo

    2014-07-11

    Nanoclusters supported on substrates are of great importance in physics and chemistry as well as in technical applications, such as single-electron transistors and nanocatalysts. The properties of nanoclusters differ significantly from those of either the constituent atoms or the bulk solid, and are highly sensitive to size and chemical composition. Here we propose a novel atom gating technique to assemble various atom clusters composed of a defined number of atoms at room temperature. The present gating operation is based on the transfer of single diffusing atoms among nanospaces governed by gates, which can be opened in response to the chemical interaction force with a scanning probe microscope tip. This method provides an alternative way to create pre-designed atom clusters with different chemical compositions and to evaluate their chemical stabilities, thus enabling investigation into the influence that a single dopant atom incorporated into the host clusters has on a given cluster stability.

  11. KSC-2013-3235

    NASA Image and Video Library

    2013-08-09

    CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room was the most advanced of the control rooms used for shuttle missions and was the primary firing room for the shuttle's final series of launches before retirement. It is furnished in a more contemporary style with wood cabinets and other features, although it retains many of the computer systems the shuttle counted on to operate safely. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang

  12. Development of Handcraft Exercise Courses that Bring Out Student's Creativity

    NASA Astrophysics Data System (ADS)

    Senda, Shinkoh; Yamamoto, Koji; Fukumori, Tutom; Matsuura, Hideo; Sato, Kazuo

    We have developed a new type of handcraft exercise program that aims to stimulate student's creativity on the way of design and fabrication of the subject machines. Conventional handicraft exercise program used to aim at letting students learn procedures of machining operation in accordance with a designated manual. Students having experienced our conventional exercise did not fully satisfied at those programs because of the lack in a room for their idea and creativity. Authors, a group of both technical and academic staffs, have developed and started the new type of program since 2003 at the Creation Plaza in Nagoya University. Developed program is classified into grades according to the difference in technical contents required for students.

  13. KSC-06pd0546

    NASA Image and Video Library

    2006-03-24

    KENNEDY SPACE CENTER, FLA. -- Scott Kerr, director of Engineering Development at Kennedy Space Center, addresses guests at a ribbon-cutting ceremony for the Operations Support Building II (behind him). He and other key Center personnel and guests attended the significant event. The Operations Support Building II is an Agency safety and health initiative project to replace 198,466 square feet of substandard modular housing and trailers in the Launch Complex 39 area at Kennedy Space Center. The five-story building, which sits south of the Vehicle Assembly Building and faces the launch pads, includes 960 office spaces, 16 training rooms, computer and multimedia conference rooms, a Mission Conference Center with an observation deck, technical libraries, an Exchange store, storage, break areas, and parking. Photo credit: NASA/George Shelton

  14. KSC-06pd0544

    NASA Image and Video Library

    2006-03-24

    KENNEDY SPACE CENTER, FLA. -- Kennedy Space Center Deputy Director Bill Parsons talks to guests at a ribbon-cutting ceremony for the Operations Support Building II (behind him). He and other key Center personnel and guests attended the significant event. The Operations Support Building II is an Agency safety and health initiative project to replace 198,466 square feet of substandard modular housing and trailers in the Launch Complex 39 area at Kennedy Space Center. The five-story building, which sits south of the Vehicle Assembly Building and faces the launch pads, includes 960 office spaces, 16 training rooms, computer and multimedia conference rooms, a Mission Conference Center with an observation deck, technical libraries, an Exchange store, storage, break areas, and parking. Photo credit: NASA/George Shelton

  15. A SUMMARY COMPARISON OF DESIGN EVALUATION TECHNIQUES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spielman, Zachary; Hill, Rachael

    The United States’ fleet of Nuclear Reactors is considering modernizing their control rooms and instrumentation as an effort to avoid component obsolescence, keep up with competing industries, and cater to a new work force among others. Multiple technologies have potential to improve the control room. In attempts to evaluate the available options researchers employ a variety of measures to ensure the best candidate is used in a modernizing effort. The NRC is in charge of ensuring any new design has been thoroughly vetted before approving a license. Laid out in NUREG-0711 “Human Factors Engineering Program Review Model” is the reviewmore » criteria for design validation. As there are a variety of measures currently used to evaluate candidate technologies, this paper seeks to identify weaknesses in the common measures used to design and validate technology in control room modernization efforts. Identifying where measurements are not meeting the criteria will help the control room modernization research platform identify where measurement development needs to occur. This will help ensure that current performance measurements are producing as reliable results as possible to select the right technology to integrate into nuclear operating control rooms.« less

  16. Engine Research Building’s Central Control Room

    NASA Image and Video Library

    1948-07-21

    Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful collection of compressors and exhausters located in the central portion of the basement provided process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. This photograph was taken just after a major upgrade to the control room in 1948. The panels on the wall contain rudimentary floor plans of the different Engine Research Building sections with indicator lights and instrumentation for each test cell. The process air equipment included 12 exhausters, four compressors, a refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.

  17. Framework for incorporating simulation into urology training.

    PubMed

    Arora, Sonal; Lamb, Benjamin; Undre, Shabnam; Kneebone, Roger; Darzi, Ara; Sevdalis, Nick

    2011-03-01

    • Changes to working hours, new technologies and increased accountability have rendered the need for alternative training environments for urologists. • Simulation offers a promising arena for learning to take place in a safe, realistic setting. • Despite its benefits, the incorporation of simulation into urological training programmes remains minimal. • The current status and future directions of simulation for training in technical and non-technical skills are reviewed as they pertain to urology. • A framework is presented for how simulation-based training could be incorporated into the entire urological curriculum. • The literature on simulation in technical and non-technical skills training is reviewed, with a specific focus upon urology. • To fully integrate simulation into a training curriculum, its possibilities for addressing all the competencies required by a urologist must be realized. • At an early stage of training, simulation has been used to develop basic technical skills and cognitive skills, such as decision-making and communication. • At an intermediate stage, the studies focus upon more advanced technical skills learnt with virtual reality simulators. • Non-technical skills training would include leadership and could be delivered with in situ models. • At the final stage, experienced trainees can practise technical and non-technical skills in full crisis simulations situated within a fully-simulated operating rooms. • Simulation can provide training in the technical and non-technical skills required to be a competent urologist. • The framework presented may guide how best to incorporate simulation into training curricula. • Future work should determine whether acquired skills transfer to clinical practice and improve patient care. © 2010 THE AUTHORS. BJU INTERNATIONAL © 2010 BJU INTERNATIONAL.

  18. 14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. WrightPatterson ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. - Wright-Patterson Air Force Base, Area B, Building No. 20A, Propeller Test Complex, Seventh Street, from E to G Streets, Dayton, Montgomery County, OH

  19. 16. View of Building 100 control room. 1987. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. View of Building 100 control room. 1987. On file at NASA Glenn Research Center, Cleveland, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  20. IET control building (TAN620). interior room. sign says, "emergency equipment ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). interior room. sign says, "emergency equipment for metal fires." INEEL negative no. HD-21-1-2 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  1. 40 CFR 62.15105 - Who must complete the operator training course? By when?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...

  2. 40 CFR 62.15105 - Who must complete the operator training course? By when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... supervisors, and control room operators who have obtained full certification from the American Society of... supervisors, and control room operators who have obtained provisional certification from the American Society...

  3. Effect of obstetric team training on team performance and medical technical skills: a randomised controlled trial.

    PubMed

    Fransen, A F; van de Ven, J; Merién, A E R; de Wit-Zuurendonk, L D; Houterman, S; Mol, B W; Oei, S G

    2012-10-01

    To determine whether obstetric team training in a medical simulation centre improves the team performance and utilisation of appropriate medical technical skills of healthcare professionals. Cluster randomised controlled trial. The Netherlands. The obstetric departments of 24 Dutch hospitals. The obstetric departments were randomly assigned to a 1-day session of multiprofessional team training in a medical simulation centre or to no such training. Team training was given with high-fidelity mannequins by an obstetrician and a communication expert. More than 6 months following training, two unannounced simulated scenarios were carried out in the delivery rooms of all 24 obstetric departments. The scenarios, comprising a case of shoulder dystocia and a case of amniotic fluid embolism, were videotaped. The team performance and utilisation of appropriate medical skills were evaluated by two independent experts. Team performance evaluated with the validated Clinical Teamwork Scale (CTS) and the employment of two specific obstetric procedures for the two clinical scenarios in the simulation (delivery of the baby with shoulder dystocia in the maternal all-fours position and conducting a perimortem caesarean section within 5 minutes for the scenario of amniotic fluid embolism). Seventy-four obstetric teams from 12 hospitals in the intervention group underwent teamwork training between November 2009 and July 2010. The teamwork performance in the training group was significantly better in comparison to the nontraining group (median CTS score: 7.5 versus 6.0, respectively; P = 0.014). The use of the predefined obstetric procedures for the two clinical scenarios was also significantly more frequent in the training group compared with the nontraining group (83 versus 46%, respectively; P = 0.009). Team performance and medical technical skills may be significantly improved after multiprofessional obstetric team training in a medical simulation centre. © 2012 The Authors BJOG An International Journal of Obstetrics and Gynaecology © 2012 RCOG.

  4. A Proficiency Based Stepwise Endovascular Curricular Training (PROSPECT) Program Enhances Operative Performance in Real Life: A Randomised Controlled Trial.

    PubMed

    Maertens, H; Aggarwal, R; Moreels, N; Vermassen, F; Van Herzeele, I

    2017-09-01

    Healthcare evolution requires optimisation of surgical training to provide safe patient care. Operating room performance after completion of proficiency based training in vascular surgery has not been investigated. A randomised controlled trial evaluated the impact of a Proficiency based Stepwise Endovascular Curricular Training program (PROSPECT) on the acquisition of endovascular skills and the transferability of these skills to real life interventions. All subjects performed two endovascular interventions treating patients with symptomatic iliac and/or superficial femoral artery stenosis under supervision. Primary outcomes were technical performances (Global Rating Scale [GRS]; Examiner Checklist), operative metrics, and patient outcomes, adjusted for case difficulty and trainee experience. Secondary outcomes included knowledge and technical performance after 6 weeks and 3 months. Thirty-two general surgical trainees were randomised into three groups. Besides traditional training, the first group (n = 11) received e-learning and simulation training (PROSPECT), the second group (n = 10) only had access to e-learning, while controls (n = 11) did not receive supplementary training. Twenty-nine trainees (3 dropouts) performed 58 procedures. Trainees who completed PROSPECT showed superior technical performance (GRS 39.36 ± 2.05; Checklist 63.51 ± 3.18) in real life with significantly fewer supervisor takeovers compared with trainees receiving e-learning alone (GRS 28.42 ± 2.15; p = .001; Checklist 53.63 ± 3.34; p = .027) or traditional education (GRS 23.09 ± 2.18; p = .001; Checklist 38.72 ± 3.38; p = .001). Supervisors felt more confident in allowing PROSPECT trained physicians to perform basic (p = .006) and complex (p = .003) procedures. No differences were detected in procedural parameters (such as fluoroscopy time, DAP, procedure time, etc.) or complications. Proficiency levels were maintained up to 3 months. A structured, stepwise, proficiency based endovascular curriculum including e-learning and simulation based training should be integrated early into training programs to enhance trainee performance. Copyright © 2017. Published by Elsevier Ltd.

  5. PBF Control Building (PER619). Interior detail of control room's severe ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior detail of control room's severe fuel damage instrument panel. Indicators provided real-time information about test underway in PBF reactor. Note audio speaker. Date: May 2004. INEEL negative no, HD-41-7-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  6. 17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  7. 12. VIEW OF OPERATING ROOMRCA COMMUNICATION REC STATION (THIS ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF OPERATING ROOM-RCA COMMUNICATION REC STATION (THIS ROOM WAS ORIGINALLY A MOTOR GENERATOR FACILITY AND SUPPLIED DC POWER TO AN EARLIER GENERATION OF POINT-TO-POINT RECEIVERS ON SECOND FLOOR). VIEW SHOWS TRANSMITTER CONTROL STATION AND AUDIO CONTROL STATION (LEFT, WATKINS-JOHNSON WJ-8718-23. HP RECEIVERS AND KENWOOD R-5000 COMMUNICATIONS RECEIVERS (220 DEGREES). - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA

  8. KSC-2009-2977

    NASA Image and Video Library

    2009-05-06

    CAPE CANAVERAL, Fla. – A technician works at installing a new window in the Launch Control Center's Firing Room 1 at NASA's Kennedy Space Center in Florida. The firing room will support the future Ares rocket launches as part of NASA's Constellation Program. Future astronauts will ride to orbit on Ares I, launched from Kennedy's Launch Pad 39B. The Launch Control Center firing rooms face the launch pads. Photo credit: NASA/Jack Pfaller

  9. 21. Interior view of citric acid air pollution control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Interior view of citric acid air pollution control room (also known as scrubber room) in Components Test Laboratory (T-27), looking southeast. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  10. 8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance and inner blast door. - Edwards Air Force Base, South Base Sled Track, Firing & Control Blockhouse for 10,000-foot Track, South of Sled Track at midpoint of 20,000-foot track, Lancaster, Los Angeles County, CA

  11. 82. VIEW OF AIRCONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    82. VIEW OF AIR-CONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF SLC-3E CONTROL ROOM. DIAL ON RIGHT (EAST) PERPENDICULAR WALL IS DIMMER FOR ROOM LIGHTING. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  12. Clifford Charlesworth seated at his console in Mission Control Room

    NASA Image and Video Library

    1968-12-21

    S68-55742 (21 Dec. 1968) --- Clifford E. Charlesworth, Apollo 8 "Green Team" flight director, is seated at his console in the Mission Operations Control Room in the Mission Control Center, Building 30, during the launch of the Apollo 8 (Spacecraft 103/Saturn 503) manned lunar orbit space mission.

  13. Game Changers: The Quest to Rethink Institutional Roles and Functions at U.S. Community Colleges

    ERIC Educational Resources Information Center

    Woods, Bob

    2014-01-01

    When the 10 members of the American Association of Community College's (AACC's) 21st-Century Implementation Team 7 (nine of whom are community college presidents) sat down in 2013 to talk about reforming institutional roles and functions at the nation's two-year career and technical colleges, everyone in the room knew the work before them would be…

  14. Impact of the BALLOTS Shared Cataloging System on the Amount of Change in the Library Technical Processing Department.

    ERIC Educational Resources Information Center

    Kershner, Lois M.

    The amount of change resulting from the implementation of the Bibliographic Automation of Large Library Operations using a Time-sharing System (BALLOTS) is analyzed, in terms of (1) physical room arrangement, (2) work procedure, and (3) organizational structure. Also considered is the factor of amount of time the new system has been in use.…

  15. Technical Assessment: Autonomy

    DTIC Science & Technology

    2015-02-01

    and video games . If DoD develops CONOPS for lower- performance systems, there is an opportunity to leverage a large amount of private investment, as the...originally designed for the Xbox video game platform, it is now being used or developed for retail environments, operating rooms, and physical therapy...approaches that render artificial intelligence less susceptible to intelligent influence. One area worthy of consideration is applied game theory, which

  16. Method of installing a control room console in a nuclear power plant

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  17. Advanced nuclear plant control room complex

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  18. KSC-99pp0237

    NASA Image and Video Library

    1999-02-25

    KENNEDY SPACE CENTER, FLA. -- Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shuttle Payloads; Sterling Walker, director, Engineering Development; Roy Bridges, director, Kennedy Space Center; Jay Greene, International Space Station manager for Technical; Michael Terry, project manager, Boeing; and Terry Smith, director of Engineering, Boeing Space Coast Operations. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test

  19. The ribbon-cutting ceremony unveils the reactivated altitude chamber inside the O&C high bay

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shuttle Payloads; Sterling Walker, director, Engineering Development; Roy Bridges, director, Kennedy Space Center; Jay Greene, International Space Station manager for Technical; Michael Terry, project manager, Boeing; and Terry Smith, director of Engineering, Boeing Space Coast Operations. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test.

  20. 133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM (114), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  1. 143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM (214), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  2. 137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM (115), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  3. 11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  4. Light Water Reactor Sustainability Program Operator Performance Metrics for Control Room Modernization: A Practical Guide for Early Design Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald Boring; Roger Lew; Thomas Ulrich

    2014-03-01

    As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how themore » process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.« less

  5. Workflows and individual differences during visually guided routine tasks in a road traffic management control room.

    PubMed

    Starke, Sandra D; Baber, Chris; Cooke, Neil J; Howes, Andrew

    2017-05-01

    Road traffic control rooms rely on human operators to monitor and interact with information presented on multiple displays. Past studies have found inconsistent use of available visual information sources in such settings across different domains. In this study, we aimed to broaden the understanding of observer behaviour in control rooms by analysing a case study in road traffic control. We conducted a field study in a live road traffic control room where five operators responded to incidents while wearing a mobile eye tracker. Using qualitative and quantitative approaches, we investigated the operators' workflow using ergonomics methods and quantified visual information sampling. We found that individuals showed differing preferences for viewing modalities and weighting of task components, with a strong coupling between eye and head movement. For the quantitative analysis of the eye tracking data, we propose a number of metrics which may prove useful to compare visual sampling behaviour across domains in future. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  6. New thinking for the boiler room.

    PubMed

    Rose, Wayne

    2008-09-01

    Wayne Rose, marketing manager at integrated plant room manufacturer Armstrong Integrated Systems, explains how increasing use of off-site manufacture, the latest 3D modelling technology, and advances in control technology, are revolutionising boiler room design and construction.

  7. Hanford Environmental Dose Reconstruction Project Monthly Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finch, S.M.

    1991-02-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon and Washington, cultural and technical experts nominated by the regional Native American tribes, and an individualmore » representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. Project reports and references used in the reports are made available to the public in a public reading room. Project progress is documented in this monthly report, which is available to the public. 3 figs., 3 tabs.« less

  8. KENNEDY SPACE CENTER, FLA. - A KSC employee dressed in a "bunny suit," standard clean room apparel, disposes of some waste material into a container designated for the purpose. The apparel is designed to cover the hair, clothing and shoes of employees entering a clean room to prevent particulate matter from contaminating the space flight hardware being stored or processed in the room. The suit and container are both part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dressed in a "bunny suit," standard clean room apparel, disposes of some waste material into a container designated for the purpose. The apparel is designed to cover the hair, clothing and shoes of employees entering a clean room to prevent particulate matter from contaminating the space flight hardware being stored or processed in the room. The suit and container are both part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  9. Ornamental indoor plants in hospital rooms enhanced health outcomes of patients recovering from surgery.

    PubMed

    Park, Seong-Hyun; Mattson, Richard H

    2009-09-01

    Clinical trials have not been reported concerning the health benefits of viewing indoor plants on stress and recovery of surgical patients within a hospital setting. Using various medical and psychologic measurements, this study performed a randomized clinical trial with surgical patients to evaluate whether plants in hospital rooms have therapeutic influences. Ninety (90) patients recovering from a hemorrhoidectomy were randomly assigned to either control or plant rooms. With half the patients, live plants were placed in their rooms during postoperative recovery periods. Data collected for each patient included length of hospitalization, analgesics used for postoperative pain control, vital signs, ratings of pain intensity, pain distress, anxiety and fatigue, the State-Trait Anxiety Inventory Form Y-1, the Environmental Assessment Scale, and the Patient's Room Satisfaction Questionnaire. Viewing plants during the recovery period had a positive influence linking directly to health outcomes of surgical patients. Patients in hospital rooms with plants and flowers had significantly more positive physiologic responses evidenced by lower systolic blood pressure, and lower ratings of pain, anxiety, and fatigue than patients in the control room. Patients with plants also felt more positively about their rooms and evaluated them with higher satisfaction when compared with patients in similar rooms without plants. Based on patients' comments, plants brightened up the room environment, reduced stress, and also conveyed positive impressions of hospital employees caring for patients. Findings of this study confirmed the therapeutic value of plants in the hospital environment as a noninvasive, inexpensive, and effective complementary medicine for surgical patients. Health care professionals and hospital administrators need to consider the use of plants and flowers to enhance healing environments for patients.

  10. Measurement and control system for cryogenic helium gas bearing turbo-expander experimental platform based on Siemens PLC S7-300

    NASA Astrophysics Data System (ADS)

    Li, J.; Xiong, L. Y.; Peng, N.; Dong, B.; Wang, P.; Liu, L. Q.

    2014-01-01

    An experimental platform for cryogenic Helium gas bearing turbo-expanders is established at the Technical Institute of Physics and Chemistry, Chinese Academy of Sciences. This turbo-expander experimental platform is designed for performance testing and experimental research on Helium turbo-expanders with different sizes from the liquid hydrogen temperature to the room temperature region. A measurement and control system based on Siemens PLC S7-300 for this turbo-expander experimental platform is developed. Proper sensors are selected to measure such parameters as temperature, pressure, rotation speed and air flow rate. All the collected data to be processed are transformed and transmitted to S7-300 CPU. Siemens S7-300 series PLC CPU315-2PN/DP is as master station and two sets of ET200M DP remote expand I/O is as slave station. Profibus-DP field communication is established between master station and slave stations. The upper computer Human Machine Interface (HMI) is compiled using Siemens configuration software WinCC V6.2. The upper computer communicates with PLC by means of industrial Ethernet. Centralized monitoring and distributed control is achieved. Experimental results show that this measurement and control system has fulfilled the test requirement for the turbo-expander experimental platform.

  11. Measurement and control system for cryogenic helium gas bearing turbo-expander experimental platform based on Siemens PLC S7-300

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, J.; Xiong, L. Y.; Peng, N.

    2014-01-29

    An experimental platform for cryogenic Helium gas bearing turbo-expanders is established at the Technical Institute of Physics and Chemistry, Chinese Academy of Sciences. This turbo-expander experimental platform is designed for performance testing and experimental research on Helium turbo-expanders with different sizes from the liquid hydrogen temperature to the room temperature region. A measurement and control system based on Siemens PLC S7-300 for this turbo-expander experimental platform is developed. Proper sensors are selected to measure such parameters as temperature, pressure, rotation speed and air flow rate. All the collected data to be processed are transformed and transmitted to S7-300 CPU. Siemensmore » S7-300 series PLC CPU315-2PN/DP is as master station and two sets of ET200M DP remote expand I/O is as slave station. Profibus-DP field communication is established between master station and slave stations. The upper computer Human Machine Interface (HMI) is compiled using Siemens configuration software WinCC V6.2. The upper computer communicates with PLC by means of industrial Ethernet. Centralized monitoring and distributed control is achieved. Experimental results show that this measurement and control system has fulfilled the test requirement for the turbo-expander experimental platform.« less

  12. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-02-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intendedmore » to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.« less

  13. 140. Detail of north control panel in control room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    140. Detail of north control panel in control room, looking north. This panel monitors a variety of activities: gages indicate the level of Lake Tapps and level of the circular forebay; wattmeters indicate output of exciters. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  14. FET. Control and equipment building, TAN630. Main floor plan. Control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FET. Control and equipment building, TAN-630. Main floor plan. Control room. Room numbers and functions. Ralph M. Parsons. 1229-2-ANP/GE-5-630-A-2. Date: March 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 036-0630-00-693-107081 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  15. Perceived Parental Care and Control among Israeli Female Adolescents Presenting to Emergency Rooms after Self-Poisoning

    ERIC Educational Resources Information Center

    Diamond, Gary M.; Didner, Hila; Waniel, Ariela; Priel, Beatriz; Asherov, Jack; Arbel, Shosh

    2005-01-01

    Levels of perceived parental care and control among 24 female Israeli adolescents presenting at emergency rooms after a self-poisoning act of low lethality were compared to those found among 23 non-self-harming, community controls. Adolescents' perceived levels of parental care and control were measured via both adolescents' self-report and…

  16. Mission Operations Control Room (MOCR) activities during STS-6 mission

    NASA Image and Video Library

    1983-04-05

    Astronauts Roy D. Bridges (left) and RIchard O. Covey serve as spacecraft communicators (CAPCOM) for STS-6. They are seated at the CAPCOM console in the mission operations control room (MOCR) of JSC's mission control center (30119); Flight Director Jay H. Greene communicates with a nearby flight controller in the MOCR just after launch of the Challenger (30120).

  17. 5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, SHOWING PUMP MOTOR AND STEEL BULKHEADS IN FLOOR FOR ACCESS TO PUMPS - Providence Sewage Treatment System, Reservoir Avenue Pumping Station, Reservoir & Pontiac Avenues, Providence, Providence County, RI

  18. 68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO TURBINE HALL AT UNITS 3, 5, AND 2) - Delaware County Electric Company, Chester Station, Delaware River at South end of Ward Street, Chester, Delaware County, PA

  19. 8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), FROM ENTRYWAY, LOOKING NORTH, SHOWING ADDITIONAL 'GAMEWELL' FIRE ALARM SYSTEMS. - Oakland Naval Supply Center, Firehouse, East of Fourth Street, between A & B Streets, Oakland, Alameda County, CA

  20. 11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL OF BOEING 737 AT TOP OF PHOTOGRAPH IN FULL-SCALE WIND TUNNEL. - NASA Langley Research Center, Full-Scale Wind Tunnel, 224 Hunting Avenue, Hampton, Hampton, VA

  1. 15. Interior view of unoccupied controlled computer room looking at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Interior view of unoccupied controlled computer room looking at exit door and office; northwest corner of unoccupied portion; view to south. - Ellsworth Air Force Base, Mess & Administration Building, 2279 Risner Drive, Blackhawk, Meade County, SD

  2. Digital radiography in general dental practice: a field study.

    PubMed

    Hellén-Halme, K; Nilsson, M; Petersson, A

    2007-07-01

    The aim of this study was to conduct a field study to survey the performance of digital radiography and how it was used by dentists in general dental practice. 19 general dental practitioners were visited at their clinics. Ambient light (illuminance) was measured in the rooms where the monitors were placed. Different technical display parameters were noted. Test images and two phantoms--one low-contrast phantom and one line-pair resolution phantom--were used to evaluate the digital system. How the dentists used the enhancement program was investigated by noting which functions were used. Average illuminance in the operating room was 668 lux (range 190-1250 lux). On radiographs of the low-contrast phantom taken at the clinic, the ability to observe the holes decreased as illuminance increased. On average, the "light percentage" initially set on the monitor had to be decreased by 17% and contrast by 10% to optimize the display of the test images. The general dental practitioners used the enhancement programs most often to alter brightness and contrast to obtain the subjectively best image. Large differences between the clinics were noted. Knowledge of how to handle digital equipment in general dental practice should be improved. A calibrated monitor of good quality should be a given priority, as should proper ambient light conditions. There is a need to develop standardized quality controls for digital dental radiography.

  3. 17. Perimeter acquisition radar building room #105, mechanical equipment room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Perimeter acquisition radar building room #105, mechanical equipment room no. 1; sign reads: Heat exchangers (shell and tube type). Provide precise temperature control of water for cooling critical electronic equipment - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  4. [Comprehensive system integration and networking in operating rooms].

    PubMed

    Feußner, H; Ostler, D; Kohn, N; Vogel, T; Wilhelm, D; Koller, S; Kranzfelder, M

    2016-12-01

    A comprehensive surveillance and control system integrating all devices and functions is a precondition for realization of the operating room of the future. Multiple proprietary integrated operation room systems are currently available with a central user interface; however, they only cover a relatively small part of all functionalities. Internationally, there are at least three different initiatives to promote a comprehensive systems integration and networking in the operating room: the Japanese smart cyber operating theater (SCOT), the American medical device plug-and-play interoperability program (MDPnP) and the German secure and dynamic networking in operating room and hospital (OR.NET) project supported by the Federal Ministry of Education and Research. Within the framework of the internationally advanced OR.NET project, prototype solution approaches were realized, which make short-term and mid-term comprehensive data retrieval systems probable. An active and even autonomous control of the medical devices by the surveillance and control system (closed loop) is expected only in the long run due to strict regulatory barriers.

  5. 12. Historic view of Building 100 control room, showing television ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic view of Building 100 control room, showing television monitoring of tests and personnel operating rocket engine test controls. May 27, 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-45021. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  6. Documentation of White Flight Control Room (WFCR), Building 30 during STS-109.

    NASA Image and Video Library

    2002-03-07

    JSC2002-E-08460 (7 March 2002) --- Flight directors Jeff Hanley (standing) and Bryan P. Austin watch the large screens from their consoles in the shuttle flight control room (WFCR) in Houston’;s Mission Control Center (MCC) during the STS-109 Hubble Space Telescope (HST) servicing mission.

  7. Situation-Dependent Medical Device Risk Estimation: Design and Evaluation of an Equipment Management Center For Vendor-Independent Integrated Operating Rooms.

    PubMed

    Maktabi, Marianne; Neumuth, Thomas

    2017-12-22

    The complexity of surgical interventions and the number of technologies involved are constantly rising. Hospital staff has to learn how to handle new medical devices efficiently. However, if medical device-related incidents occur, the patient treatment is delayed. Patient safety could therefore be supported by an optimized assistance system that helps improve the management of technical equipment by nonmedical hospital staff. We developed a system for the optimal monitoring of networked medical device activity and maintenance requirements, which works in conjunction with a vendor-independent integrated operating room and an accurate surgical intervention Time And Resource Management System. An integrated situation-dependent risk assessment system gives the medical engineers optimal awareness of the medical devices in the operating room. A qualitative and quantitative survey among ten medical engineers from three different hospitals was performed to evaluate the approach. A series of 25 questions was used to evaluate various aspects of our system as well as the system currently used. Moreover, the respondents were asked to perform five tasks related to system supervision and incident handling. Our system received a very positive feedback. The evaluation studies showed that the integration of information, the structured presentation of information, and the assistance modules provide valuable support to medical engineers. An automated operating room monitoring system with an integrated risk assessment and Time And Resource Management System module is a new way to assist the staff being outside of a vendor-independent integrated operating room, who are nevertheless involved in processes in the operating room.

  8. 37. INTERIOR VIEW TO THE WEST OF ROOM 203, THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. INTERIOR VIEW TO THE WEST OF ROOM 203, THE CONTROL ROOM FOR THE DISASSEMBLY BAY. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  9. Altitude Wind Tunnel Control Room

    NASA Image and Video Library

    1945-05-21

    Researchers at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory monitor a ramjet's performance in the Altitude Wind Tunnel from the control room. The soundproof control room was just a few feet from the tunnel’s 20-foot-diameter test section. In the control room, the operators could control all aspects of the tunnel’s operation, including the air density, temperature, and speed. They also operated the engine or test article in the test section by controlling the angle-of-attack, speed, power, and other parameters. The men in this photograph are monitoring the engine’s thrust and lift. A NACA-designed 20-inch-diameter ramjet was installed in the tunnel in May 1945. Thrust figures from these runs were compared with drag data from tests of scale models in small supersonic tunnels to verify the ramjet’s feasibility. The tunnel was used to analyze the ramjet’s overall performance up to altitudes of 47,000 feet and speeds to Mach 1.84. The researchers found that an increase in altitude caused a reduction in the engine’s horsepower and identified optimal flameholder configurations.

  10. 141. Detail of east control panel in control room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    141. Detail of east control panel in control room, looking east. This panel contains electrical switches that were used to control valves at circular forebay. It also contains voltage regulators, synchroscope adjust field breaker, ammeters, wattmeters, temperature indicator of generator windings, and butterfly valve and governor controls. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  11. One size fits all? Mixed methods evaluation of the impact of 100% single-room accommodation on staff and patient experience, safety and costs

    PubMed Central

    Maben, Jill; Penfold, Clarissa; Simon, Michael; Anderson, Janet E; Robert, Glenn; Pizzo, Elena; Hughes, Jane; Murrells, Trevor; Barlow, James

    2016-01-01

    Background and objectives There is little strong evidence relating to the impact of single-room accommodation on healthcare quality and safety. We explore the impact of all single rooms on staff and patient experience; safety outcomes; and costs. Methods Mixed methods pre/post ‘move’ comparison within four nested case study wards in a single acute hospital with 100% single rooms; quasi-experimental before-and-after study with two control hospitals; analysis of capital and operational costs associated with single rooms. Results Two-thirds of patients expressed a preference for single rooms with comfort and control outweighing any disadvantages (sense of isolation) felt by some. Patients appreciated privacy, confidentiality and flexibility for visitors afforded by single rooms. Staff perceived improvements (patient comfort and confidentiality), but single rooms were worse for visibility, surveillance, teamwork, monitoring and keeping patients safe. Staff walking distances increased significantly post move. A temporary increase of falls and medication errors in one ward was likely to be associated with the need to adjust work patterns rather than associated with single rooms per se. We found no evidence that single rooms reduced infection rates. Building an all single-room hospital can cost 5% more with higher housekeeping and cleaning costs but the difference is marginal over time. Conclusions Staff needed to adapt their working practices significantly and felt unprepared for new ways of working with potentially significant implications for the nature of teamwork in the longer term. Staff preference remained for a mix of single rooms and bays. Patients preferred single rooms. PMID:26408568

  12. Analysis of the Parameters Required for Performance Monitoring and Assessment of Military Communications Systems by Military Technical Controller

    DTIC Science & Technology

    1975-12-01

    139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters

  13. 76 FR 35130 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors AGENCY: Pipeline and Hazardous Materials Safety Administration... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  14. 30. Perimeter acquisition radar building room #318, showing radar control. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Perimeter acquisition radar building room #318, showing radar control. Console and line printers - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  15. 75 FR 5536 - Pipeline Safety: Control Room Management/Human Factors, Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors, Correction AGENCY: Pipeline and Hazardous Materials Safety... following correcting amendments: PART 192--TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM...

  16. Staphylococcus aureus recovery from environmental and human locations in 2 collegiate athletic teams.

    PubMed

    Oller, Anna R; Province, Larry; Curless, Brian

    2010-01-01

    Staphylococcus aureus is spread via direct contact with persons and indirect contact via environmental surfaces such as weight benches. Athletes participating in direct-contact sports have an increased risk of acquiring S aureus infections. To determine (1) potential environmental reservoirs of S aureus in football and wrestling locker rooms and weight rooms, (2) environmental bacterial status after employing more stringent cleaning methods, (3) differences in colonization rates between athletes and nonathletes, (4) exposed body locations where Staphylococcus was recovered more frequently, and (5) personal hygiene practices of athletes and nonathletes. Cross-sectional study. Locker room and strengthening and conditioning facilities at a National Collegiate Athletic Association Division II university. Collegiate football players and wrestlers, with nonathlete campus residents serving as the control group. Infection control methods, education of the custodial staff, and education of the athletes regarding the Centers for Disease Control and Prevention guidelines for infection prevention. Cultures were taken from the participants' noses, fingertips, knuckles, forearms, and shoes and from the environment. Before the intervention, from the 108 environmental samples taken from the football locker room and weight room, 26 (24%) contained methicillin-susceptible S aureus (MSSA) and 33 (31%) contained methicillin-resistant S aureus (MRSA). From the 39 environmental samples taken from the wrestling locker room and pit areas, 1 (3%) contained MSSA and 4 (10%) contained MRSA. The MRSA rates were different between the 2 locations according to a chi(2) test (P = .01). Seven MRSA isolates were recovered from football players and 1 from a wrestler; no MRSA isolates were recovered from the control group. The fingertip location of S aureus recovery from football players was significant when compared with both other locations in football players and fingertips in wrestlers and the control group (P < .05). Football players and wrestlers shared more personal items than the control group (P < .05). After the intervention, the football locker room and weight room samples were negative for S aureus. Intact strengthening and conditioning equipment, proper hygiene, and proper disinfection methods lowered both environmental and human S aureus recovery at 1 university.

  17. 104. ARAIII. Interior view of room 110 in ARA607 used ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    104. ARA-III. Interior view of room 110 in ARA-607 used as data acquisition control room. Camera facing northeast. Ineel photo no. 81-103. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  18. Comparison of Collection Methods for Fecal Samples for Discovery Metabolomics in Epidemiologic Studies.

    PubMed

    Loftfield, Erikka; Vogtmann, Emily; Sampson, Joshua N; Moore, Steven C; Nelson, Heidi; Knight, Rob; Chia, Nicholas; Sinha, Rashmi

    2016-11-01

    The gut metabolome may be associated with the incidence and progression of numerous diseases. The composition of the gut metabolome can be captured by measuring metabolite levels in the feces. However, there are little data describing the effect of fecal sample collection methods on metabolomic measures. We collected fecal samples from 18 volunteers using four methods: no solution, 95% ethanol, fecal occult blood test (FOBT) cards, and fecal immunochemical test (FIT). One set of samples was frozen after collection (day 0), and for 95% ethanol, FOBT, and FIT, a second set was frozen after 96 hours at room temperature. We evaluated (i) technical reproducibility within sample replicates, (ii) stability after 96 hours at room temperature for 95% ethanol, FOBT, and FIT, and (iii) concordance of metabolite measures with the putative "gold standard," day 0 samples without solution. Intraclass correlation coefficients (ICC) estimating technical reproducibility were high for replicate samples for each collection method. ICCs estimating stability at room temperature were high for 95% ethanol and FOBT (median ICC > 0.87) but not FIT (median ICC = 0.52). Similarly, Spearman correlation coefficients (r s ) estimating metabolite concordance with the "gold standard" were higher for 95% ethanol (median r s = 0.82) and FOBT (median r s = 0.70) than for FIT (median r s = 0.40). Metabolomic measurements appear reproducible and stable in fecal samples collected with 95% ethanol or FOBT. Concordance with the "gold standard" is highest with 95% ethanol and acceptable with FOBT. Future epidemiologic studies should collect feces using 95% ethanol or FOBT if interested in studying fecal metabolomics. Cancer Epidemiol Biomarkers Prev; 25(11); 1483-90. ©2016 AACR. ©2016 American Association for Cancer Research.

  19. Is single room hospital accommodation associated with differences in healthcare-associated infection, falls, pressure ulcers or medication errors? A natural experiment with non-equivalent controls

    PubMed Central

    Maben, Jill; Murrells, Trevor; Griffiths, Peter

    2016-01-01

    Objectives A wide range of patient benefits have been attributed to single room hospital accommodation including a reduction in adverse patient safety events. However, studies have been limited to the US with limited evidence from elsewhere. The aim of this study was to assess the impact on safety outcomes of the move to a newly built all single room acute hospital. Methods A natural experiment investigating the move to 100% single room accommodation in acute assessment, surgical and older people’s wards. Move to 100% single room accommodation compared to ‘steady state’ and ‘new build’ control hospitals. Falls, pressure ulcer, medication error, meticillin-resistant Staphylococcus aureus and Clostridium difficile rates from routine data sources were measured over 36 months. Results Five of 15 time series in the wards that moved to single room accommodation revealed changes that coincided with the move to the new all single room hospital: specifically, increased fall, pressure ulcer and Clostridium difficile rates in the older people’s ward, and temporary increases in falls and medication errors in the acute assessment unit. However, because the case mix of the older people’s ward changed, and because the increase in falls and medication errors on the acute assessment ward did not last longer than six months, no clear effect of single rooms on the safety outcomes was demonstrated. There were no changes to safety events coinciding with the move at the new build control site. Conclusion For all changes in patient safety events that coincided with the move to single rooms, we found plausible alternative explanations such as case-mix change or disruption as a result of the re-organization of services after the move. The results provide no evidence of either benefit or harm from all single room accommodation in terms of safety-related outcomes, although there may be short-term risks associated with a move to single rooms. PMID:26811373

  20. Is single room hospital accommodation associated with differences in healthcare-associated infection, falls, pressure ulcers or medication errors? A natural experiment with non-equivalent controls.

    PubMed

    Simon, Michael; Maben, Jill; Murrells, Trevor; Griffiths, Peter

    2016-07-01

    A wide range of patient benefits have been attributed to single room hospital accommodation including a reduction in adverse patient safety events. However, studies have been limited to the US with limited evidence from elsewhere. The aim of this study was to assess the impact on safety outcomes of the move to a newly built all single room acute hospital. A natural experiment investigating the move to 100% single room accommodation in acute assessment, surgical and older people's wards. Move to 100% single room accommodation compared to 'steady state' and 'new build' control hospitals. Falls, pressure ulcer, medication error, meticillin-resistant Staphylococcus aureus and Clostridium difficile rates from routine data sources were measured over 36 months. Five of 15 time series in the wards that moved to single room accommodation revealed changes that coincided with the move to the new all single room hospital: specifically, increased fall, pressure ulcer and Clostridium difficile rates in the older people's ward, and temporary increases in falls and medication errors in the acute assessment unit. However, because the case mix of the older people's ward changed, and because the increase in falls and medication errors on the acute assessment ward did not last longer than six months, no clear effect of single rooms on the safety outcomes was demonstrated. There were no changes to safety events coinciding with the move at the new build control site. For all changes in patient safety events that coincided with the move to single rooms, we found plausible alternative explanations such as case-mix change or disruption as a result of the re-organization of services after the move. The results provide no evidence of either benefit or harm from all single room accommodation in terms of safety-related outcomes, although there may be short-term risks associated with a move to single rooms. © The Author(s) 2016.

  1. Simulation-based camera navigation training in laparoscopy-a randomized trial.

    PubMed

    Nilsson, Cecilia; Sorensen, Jette Led; Konge, Lars; Westen, Mikkel; Stadeager, Morten; Ottesen, Bent; Bjerrum, Flemming

    2017-05-01

    Inexperienced operating assistants are often tasked with the important role of handling camera navigation during laparoscopic surgery. Incorrect handling can lead to poor visualization, increased operating time, and frustration for the operating surgeon-all of which can compromise patient safety. The objectives of this trial were to examine how to train laparoscopic camera navigation and to explore the transfer of skills to the operating room. A randomized, single-center superiority trial with three groups: The first group practiced simulation-based camera navigation tasks (camera group), the second group practiced performing a simulation-based cholecystectomy (procedure group), and the third group received no training (control group). Participants were surgical novices without prior laparoscopic experience. The primary outcome was assessment of camera navigation skills during a laparoscopic cholecystectomy. The secondary outcome was technical skills after training, using a previously developed model for testing camera navigational skills. The exploratory outcome measured participants' motivation toward the task as an operating assistant. Thirty-six participants were randomized. No significant difference was found in the primary outcome between the three groups (p = 0.279). The secondary outcome showed no significant difference between the interventions groups, total time 167 s (95% CI, 118-217) and 194 s (95% CI, 152-236) for the camera group and the procedure group, respectively (p = 0.369). Both interventions groups were significantly faster than the control group, 307 s (95% CI, 202-412), p = 0.018 and p = 0.045, respectively. On the exploratory outcome, the control group for two dimensions, interest/enjoyment (p = 0.030) and perceived choice (p = 0.033), had a higher score. Simulation-based training improves the technical skills required for camera navigation, regardless of practicing camera navigation or the procedure itself. Transfer to the clinical setting could, however, not be demonstrated. The control group demonstrated higher interest/enjoyment and perceived choice than the camera group.

  2. Air Cleaning Technologies

    PubMed Central

    2005-01-01

    Executive Summary Objective This health technology policy assessment will answer the following questions: When should in-room air cleaners be used? How effective are in-room air cleaners? Are in-room air cleaners that use combined HEPA and UVGI air cleaning technology more effective than those that use HEPA filtration alone? What is the Plasmacluster ion air purifier in the pandemic influenza preparation plan? The experience of severe acute respiratory syndrome (SARS) locally, nationally, and internationally underscored the importance of administrative, environmental, and personal protective infection control measures in health care facilities. In the aftermath of the SARS crisis, there was a need for a clearer understanding of Ontario’s capacity to manage suspected or confirmed cases of airborne infectious diseases. In so doing, the Walker Commission thought that more attention should be paid to the potential use of new technologies such as in-room air cleaning units. It recommended that the Medical Advisory Secretariat of the Ontario Ministry of Health and Long-Term Care evaluate the appropriate use and effectiveness of such new technologies. Accordingly, the Ontario Health Technology Advisory Committee asked the Medical Advisory Secretariat to review the literature on the effectiveness and utility of in-room air cleaners that use high-efficiency particle air (HEPA) filters and ultraviolet germicidal irradiation (UVGI) air cleaning technology. Additionally, the Ontario Health Technology Advisory Committee prioritized a request from the ministry’s Emergency Management Unit to investigate the possible role of the Plasmacluster ion air purifier manufactured by Sharp Electronics Corporation, in the pandemic influenza preparation plan. Clinical Need Airborne transmission of infectious diseases depends in part on the concentration of breathable infectious pathogens (germs) in room air. Infection control is achieved by a combination of administrative, engineering, and personal protection methods. Engineering methods that are usually carried out by the building’s heating, ventilation, and air conditioning (HVAC) system function to prevent the spread of airborne infectious pathogens by diluting (dilution ventilation) and removing (exhaust ventilation) contaminated air from a room, controlling the direction of airflow and the air flow patterns in a building. However, general wear and tear over time may compromise the HVAC system’s effectiveness to maintain adequate indoor air quality. Likewise, economic issues may curtail the completion of necessary renovations to increase its effectiveness. Therefore, when exposure to airborne infectious pathogens is a risk, the use of an in-room air cleaner to reduce the concentration of airborne pathogens and prevent the spread of airborne infectious diseases has been proposed as an alternative to renovating a HVAC system. Airborne transmission is the spread of infectious pathogens over large distances through the air. Infectious pathogens, which may include fungi, bacteria, and viruses, vary in size and can be dispersed into the air in drops of moisture after coughing or sneezing. Small drops of moisture carrying infectious pathogens are called droplet nuclei. Droplet nuclei are about 1 to 5μm in diameter. This small size in part allows them to remain suspended in the air for several hours and be carried by air currents over considerable distances. Large drops of moisture carrying infectious pathogens are called droplets. Droplets being larger than droplet nuclei, travel shorter distances (about 1 metre) before rapidly falling out of the air to the ground. Because droplet nuclei remain airborne for longer periods than do droplets, they are more amenable to engineering infection control methods than are droplets. Droplet nuclei are responsible for the airborne transmission of infectious diseases such as tuberculosis, chicken pox (varicella), measles (rubeola), and dessiminated herpes zoster, whereas close contact is required for the direct transmission of infectious diseases transmitted by droplets, such as influenza (the flu) and SARS. The Technology In-room air cleaners are supplied as portable or fixed devices. Fixed devices can be attached to either a wall or ceiling and are preferred over portable units because they have a greater degree of reliability (if installed properly) for achieving adequate room air mixing and airflow patterns, which are important for optimal effectiveness. Through a method of air recirculation, an in-room air cleaner can be used to increase room ventilation rates and if used to exhaust air out of the room it can create a negative-pressure room for airborne infection isolation (AII) when the building’s HVAC system cannot do so. A negative-pressure room is one where clean air flows into the room but contaminated air does not flow out of it. Contaminated room air is pulled into the in-room air cleaner and cleaned by passing through a series of filters, which remove the airborne infectious pathogens. The cleaned air is either recirculated into the room or exhausted outside the building. By filtering contaminated room air and then recirculating the cleaned air into the room, an in-room air cleaner can improve the room’s ventilation. By exhausting the filtered air to the outside the unit can create a negative-pressure room. There are many types of in-room air cleaners. They vary widely in the airflow rates through the unit, the type of air cleaning technology used, and the technical design. Crucial to maximizing the efficiency of any in-room air cleaner is its strategic placement and set-up within a room, which should be done in consultation with ventilation engineers, infection control experts, and/or industrial hygienists. A poorly positioned air cleaner may disrupt airflow patterns within the room and through the air cleaner, thereby compromising its air cleaning efficiency. The effectiveness of an in-room air cleaner to remove airborne pathogens from room air depends on several factors, including the airflow rate through the unit’s filter and the airflow patterns in the room. Tested under a variety of conditions, in-room air cleaners, including portable or ceiling mounted units with either a HEPA or a non-HEPA filter, portable units with UVGI lights only, or ceiling mounted units with combined HEPA filtration and UVGI lights, have been estimated to be between 30% and 90%, 99% and 12% and 80% effective, respectively. However, and although their effectiveness is variable, the United States Centers for Disease Control and Prevention has acknowledged in-room air cleaners as alternative technology for increasing room ventilation when this cannot be achieved by the building’s HVAC system with preference given to fixed recirculating systems over portable ones. Importantly, the use of an in-room air cleaner does not preclude either the need for health care workers and visitors to use personal protective equipment (N95 mask or equivalent) when entering AII rooms or health care facilities from meeting current regulatory requirements for airflow rates (ventilation rates) in buildings and airflow differentials for effective negative-pressure rooms. The Plasmacluster ion technology, developed in 2000, is an air purification technology. Its manufacturer, Sharp Electronics Corporation, says that it can disable airborne microorganisms through the generation of both positive and negative ions. (1) The functional unit is the hydroxyl, which is a molecule comprised of one oxygen molecule and one hydrogen atom. Plasmacluster ion air purifier uses a multilayer filter system composed of a prefilter, a carbon filter, an antibacterial filter, and a HEPA filter, combined with an ion generator to purify the air. The ion generator uses an alternating plasma discharge to split water molecules into positively and negatively charged ions. When these ions are emitted into the air, they are surrounded by water molecules and form cluster ions which are attracted to airborne particles. The cluster ion surrounds the airborne particle, and the positive and negative ions react to form hydroxyls. These hydroxyls steal the airborne particle’s hydrogen atom, which creates a hole in the particle’s outer protein membrane, thereby rendering it inactive. Because influenza is primarily acquired by large droplets and direct and indirect contact with an infectious person, any in-room air cleaner will have little benefit in controlling and preventing its spread. Therefore, there is no role for the Plasmacluster ion air purifier or any other in-room air cleaner in the control of the spread of influenza. Accordingly, for purposes of this review, the Medical Advisory Secretariat presents no further analysis of the Plasmacluster. Review Strategy The objective of the systematic review was to determine the effectiveness of in-room air cleaners with built in UVGI lights and HEPA filtration compared with those using HEPA filtration only. The Medical Advisory Secretariat searched the databases of MEDLINE, EMBASE, Cochrane Database of Systematic Reviews, INAHATA (International Network of Agencies for Health Technology Assessment), Biosis Previews, Bacteriology Abstracts, Web of Science, Dissertation Abstracts, and NIOSHTIC 2. A meta-analysis was conducted if adequate data was available from 2 or more studies and where statistical and clinical heterogeneity among studies was not an issue. Otherwise, a qualitative review was completed. The GRADE system was used to summarize the quality of the body of evidence comprised of 1 or more studies. Summary of Findings There were no existing health technology assessments on air cleaning technology located during the literature review. The literature search yielded 59 citations of which none were retained. One study was retrieved from a reference list of a guidance document from the United States Centers for Disease Control and Prevention, which evaluated an in-room air cleaner with combined UVGI lights and HEPA filtration under 2 conditions: UVGI lights on and UVGI lights off. Experiments were performed using different ventilation rates and using an aerosolized pathogen comprised of Mycobaterium parafortuitum, a surrogate for the bacterium that causes tuberculosis. Effectiveness was measured as equivalent air changes per hour (eACH). This single study formed the body of evidence for our systematic review research question. Experimental Results The eACH rate for the HEPA-UVGI in-room air cleaner was statistically significantly greater when the UV lights were on compared with when the UV lights were off. (P < .05). However, subsequent experiments could not attribute this to the UVGI. Consequently, the results are inconclusive and an estimate of effect (benefit) is uncertain. The study was reviewed by a scientific expert and rated moderate for quality. Further analysis determined that there was some uncertainty in the directness of the outcome measure (eACH); thus, the GRADE level for the quality of the evidence was low indicating that an estimate of effect is very uncertain. There is uncertainty in the benefits of using in-room air cleaners with combined UVGI lights and HEPA filtration over systems that use HEPA filtration alone. However, there are no known risks to using systems with combined UVGI and HEPA technology compared with those with HEPA alone. There is an increase in the burden of cost including capital costs (cost of the device), operating costs (electricity usage), and maintenance costs (cleaning and replacement of UVGI lights) to using an in-room air cleaner with combined UVGI and HEPA technology compared with those with HEPA alone. Given the uncertainty of the estimate of benefits, an in-room air cleaner with HEPA technology only may be an equally reasonable alternative to using one with combined UVGI and HEPA technology Conclusions In-room air cleaners may be used to protect health care staff from air borne infectious pathogens such as tuberculosis, chicken pox, measles, and dessiminated herpes zoster. In addition, and although in-room air cleaners are not effective at protecting staff and preventing the spread of droplet-transmitted diseases such as influenza and SARS, they may be deployed in situations with a novel/emerging infectious agent whose epidemiology is not yet defined and where airborne transmission is suspected. It is preferable that in-room air cleaners be used with a fixed and permanent room placement when ventilation requirements must be improved and the HVAC system cannot be used. However, for acute (temporary) situations where a novel/emerging infectious agent presents whose epidemiology is not yet defined and where airborne transmission is suspected it may be prudent to use the in room air cleaner as a portable device until mode of transmission is confirmed. To maximize effectiveness, consultation with an environmental engineer and infection control expert should be undertaken before using an in-room air cleaner and protocols for maintenance and monitoring of these devices should be in place. If properly installed and maintained, in room air cleaners with HEPA or combined HEPA and UVGI air cleaning technology are effective in removing airborne pathogens. However, there is only weak evidence available at this time regarding the benefit of using an in-room air cleaner with combined HEPA and UVGI air cleaner technology instead of those with HEPA filter technology only. PMID:23074468

  3. The Effect of Technical Performance on Patient Outcomes in Surgery: A Systematic Review.

    PubMed

    Fecso, Andras B; Szasz, Peter; Kerezov, Georgi; Grantcharov, Teodor P

    2017-03-01

    Systematic review of the effect of intraoperative technical performance on patient outcomes. The operating room is a high-stakes, high-risk environment. As a result, the quality of surgical interventions affecting patient outcomes has been the subject of discussion and research for years. MEDLINE, EMBASE, PsycINFO, and Cochrane databases were searched. All surgical specialties were eligible for inclusion. Data were reviewed in regards to the methods by which technical performance was measured, what patient outcomes were assessed, and how intraoperative technical performance affected patient outcomes. Quality of evidence was assessed using the Medical Education Research Study Quality Instrument (MERSQI). Of the 12,758 studies initially identified, 24 articles (7775 total participants) were ultimately included in this review. Seventeen studies assessed the performance of the faculty alone, 2 assessed both the faculty and trainees, 1 assessed trainees alone, and in 4 studies, the level of the operating surgeon was not specified. In 18 studies, a performance assessment tool was used. Patient outcomes were evaluated using intraoperative complications, short-term morbidity, long-term morbidity, short-term mortality, and long-term mortality. The average MERSQI score was 11.67 (range 9.5-14.5). Twenty-one studies demonstrated that superior technical performance was related to improved patient outcomes. The results of this systematic review demonstrated that superior technical performance positively affects patient outcomes. Despite this initial evidence, more robust research is needed to directly assess intraoperative technical performance and its effect on postoperative patient outcomes using meaningful assessment instruments and reliable processes.

  4. 75 FR 64984 - Availability of an Environmental Assessment for a Biological Control Agent for Hawkweeds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ..., Riverdale, MD 20737-1238. Please state that your comment refers to Docket No. APHIS-2010-0078. Reading Room: You may read any comments that we receive on the environmental assessment in our reading room. The reading room is located in room 1141 of the USDA South Building, 14th Street and Independence Avenue, SW...

  5. Technical and Associated R&D Laboratory/Project Support to AFRL/RXQL Airbase Sciences Branch

    DTIC Science & Technology

    2011-10-01

    the organophosphorus nerve agents . The coupons were allowed to sit overnight at room temperature to allow the phosphoric acid to adsorb into the...of chlorine and of ammonia across samples of several soil types; measurements of adsorption of two chemical agent surrogates (dimethyl...methylphosphonate and diisopropyl fluorophosphate) on cellulose and silica gel surfaces by inverse gas chromatography, to infer enthalpies of adsorption. Reactive

  6. Advanced Video Technology for Safe and Efficient Surgical Operating Rooms

    DTIC Science & Technology

    2005-03-01

    should be easy to integrate into the system by non-technical personnel. " Disruptive Technologies - Such technologies can have both positive and negative...integrate new, emerging, and otherwise " disruptive technologies ." " Medical Manufacturer Markups - In some cases, potential vendor pricing of...POSITIVE disruptive technologies as they would, in some cases, eliminate the need for monitor screens. NETWORK BANDWIDTH j% J a The System must be able to

  7. Emergency room volunteer internship: an instrument for quality in medical training.

    PubMed

    Nasr, Adonis; Talini, Carolina; Neves, Giana Carolina Strack; Krieger, João Guilherme Cavalcanti; Collaço, Iwan Augusto; Domingos, Micheli Fortunato

    2012-01-01

    To analyze the influence of medical student's voluntary internship at the Emergency Room of the Workers Hospital (ER-HT) in the choice of medical specialty and its importance during graduation. A questionnaire was given to doctors and medical students that performed internships at ER-HT for e" 500 hours, from March 2000 until March 2012. A total of 765 medical students and doctors performed e" 500 hours of practical activities at ER-HT and 390 answered the questionnaire - 37,9% chose surgical specialties and 24,1% clinical. Internship was crucial in choosing a career for 82,3%, and was a positive influence for 83,8%. Regarding the increment in interpersonal relationship, grade e" 8 was given by 61% of the participants for relationship with other professionals, 71% for relationship with colleagues and 63% for relationship with patients. The internship increased self-confidence for 92% and 75% reported an increase in technical knowledge. The training was considered useful and necessary for medical education to 80% of participants. Contribution provided by ER internships is undeniable for medical education and often influences students on choosing their medical specialties. The situations faced by students during these activities enable the development of intelligence in areas other than purely technical, which reflects in their medical practice.

  8. IET control building (TAN620). interior personnel service room. sign next ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). interior personnel service room. sign next to shower stall says, "fight athlete's foot with sani-mist." INEEL negative no. HD-21-1-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  9. 18. Historic plan of Building 100 control room. March 21, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Historic plan of Building 100 control room. March 21, 1956. NASA GRC drawing number CE-101736. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  10. 3. DETAIL OF RACKS AND TEMPERATURE/HUMIDITY CONTROL SYSTEM IN CURING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. DETAIL OF RACKS AND TEMPERATURE/HUMIDITY CONTROL SYSTEM IN CURING ROOM ON LEVEL 6; LOOKING SOUTHEAST; ENVIRONMENT INSIDE THE CURING ROOM WAS CONTROLLED BY NIAGARA MODEL 87007 SPRAY COOLER AND BUFFALO FORGE CENTRIFUGAL FAN IN BACKGROUND - Rath Packing Company, Cooler Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  11. The impact of nontechnical skills on technical performance in surgery: a systematic review.

    PubMed

    Hull, Louise; Arora, Sonal; Aggarwal, Rajesh; Darzi, Ara; Vincent, Charles; Sevdalis, Nick

    2012-02-01

    Failures in nontechnical and teamwork skills frequently lie at the heart of harm and near-misses in the operating room (OR). The purpose of this systematic review was to assess the impact of nontechnical skills on technical performance in surgery. MEDLINE, EMBASE, PsycINFO databases were searched, and 2,041 articles were identified. After limits were applied, 341 articles were retrieved for evaluation. Of these, 28 articles were accepted for this review. Data were extracted from the articles regarding sample population, study design and setting, measures of nontechnical skills and technical performance, study findings, and limitations. Of the 28 articles that met inclusion criteria, 21 articles assessed the impact of surgeons' nontechnical skills on their technical performance. The evidence suggests that receiving feedback and effectively coping with stressful events in the OR has a beneficial impact on certain aspects of technical performance. Conversely, increased levels of fatigue are associated with detriments to surgical skill. One article assessed the impact of anesthesiologists' nontechnical skills on anesthetic technical performance, finding a strong positive correlation between the 2 skill sets. Finally, 6 articles assessed the impact of multiple nontechnical skills of the entire OR team on surgical performance. A strong relationship between teamwork failure and technical error was empirically demonstrated in these studies. Evidence suggests that certain nontechnical aspects of performance can enhance or, if lacking, contribute to deterioration of surgeons' technical performance. The precise extent of this effect remains to be elucidated. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  12. 14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM 3, FLOW CONTROL ROOM, BUILDING 3113/3113A. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV

  13. 57. VIEW LOOKING NORTHWEST OF SIGNAL POWER CONDITIONING ROOM LOCATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. VIEW LOOKING NORTHWEST OF SIGNAL POWER CONDITIONING ROOM LOCATED OVER CONTROL ROOM MEZZANINE. SHOWN WITHIN THE BRICK PARTITIONS ARE SIGNAL VOLTAGE AUTOTRANSFORMERS. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT

  14. Recent advances of rearing cabinet instrumentation and control system for insect stock culture

    NASA Astrophysics Data System (ADS)

    Hermawan, Wawan; Kasmara, Hikmat; Melanie, Panatarani, Camellia; Joni, I. Made

    2017-01-01

    Helicoverpa armigera (Hubner) is one of a serious pest of horticulture in Indonesia. Helicoverpa armigera Nuclear Polyhedrovirus (HaNPV) has attracted interest for many researchers as a pest control for larvae of this species. Currently, we investigating the agrochemical formulations of HaNPV by introducing nanotechnology. Thus it is required an acceptable efficiency of insect stock cultures equipped with advance instruments to resolve the difficulties on insect stock seasons dependency. In addition, it is important to improve the insect survival with the aid of artificial natural environment and gain high insect production. This paper reports the rearing cabinet used as preparation of stock culture includes air-conditioning system, lighting, i.e. day and night control, and the main principles on recent technical and procedural advances apparatus of the system. The rearing system was moveable, designed and build by allowing air-conditioned cabinet for rearing insects, air motion and distribution as well as temperature and humidity being precisely controlled. The air was heated, humidified, and dehumidified respectively using a heater and ultrasonic nebulizer as actuators. Temperature and humidity can be controlled at any desired levels from room temperature (20°C) to 40 ± 1°C and from 0 to 80% RH with an accuracy of ±3% R.H. It is concluded that the recent design has acceptable performance based on the defined requirement for insect rearing and storage.

  15. Does integration of HIV and sexual and reproductive health services improve technical efficiency in Kenya and Swaziland? An application of a two-stage semi parametric approach incorporating quality measures

    PubMed Central

    Obure, Carol Dayo; Jacobs, Rowena; Guinness, Lorna; Mayhew, Susannah; Vassall, Anna

    2016-01-01

    Theoretically, integration of vertically organized services is seen as an important approach to improving the efficiency of health service delivery. However, there is a dearth of evidence on the effect of integration on the technical efficiency of health service delivery. Furthermore, where technical efficiency has been assessed, there have been few attempts to incorporate quality measures within efficiency measurement models particularly in sub-Saharan African settings. This paper investigates the technical efficiency and the determinants of technical efficiency of integrated HIV and sexual and reproductive health (SRH) services using data collected from 40 health facilities in Kenya and Swaziland for 2008/2009 and 2010/2011. Incorporating a measure of quality, we estimate the technical efficiency of health facilities and explore the effect of integration and other environmental factors on technical efficiency using a two-stage semi-parametric double bootstrap approach. The empirical results reveal a high degree of inefficiency in the health facilities studied. The mean bias corrected technical efficiency scores taking quality into consideration varied between 22% and 65% depending on the data envelopment analysis (DEA) model specification. The number of additional HIV services in the maternal and child health unit, public ownership and facility type, have a positive and significant effect on technical efficiency. However, number of additional HIV and STI services provided in the same clinical room, proportion of clinical staff to overall staff, proportion of HIV services provided, and rural location had a negative and significant effect on technical efficiency. The low estimates of technical efficiency and mixed effects of the measures of integration on efficiency challenge the notion that integration of HIV and SRH services may substantially improve the technical efficiency of health facilities. The analysis of quality and efficiency as separate dimensions of performance suggest that efficiency may be achieved without sacrificing quality. PMID:26803655

  16. Does integration of HIV and sexual and reproductive health services improve technical efficiency in Kenya and Swaziland? An application of a two-stage semi parametric approach incorporating quality measures.

    PubMed

    Obure, Carol Dayo; Jacobs, Rowena; Guinness, Lorna; Mayhew, Susannah; Vassall, Anna

    2016-02-01

    Theoretically, integration of vertically organized services is seen as an important approach to improving the efficiency of health service delivery. However, there is a dearth of evidence on the effect of integration on the technical efficiency of health service delivery. Furthermore, where technical efficiency has been assessed, there have been few attempts to incorporate quality measures within efficiency measurement models particularly in sub-Saharan African settings. This paper investigates the technical efficiency and the determinants of technical efficiency of integrated HIV and sexual and reproductive health (SRH) services using data collected from 40 health facilities in Kenya and Swaziland for 2008/2009 and 2010/2011. Incorporating a measure of quality, we estimate the technical efficiency of health facilities and explore the effect of integration and other environmental factors on technical efficiency using a two-stage semi-parametric double bootstrap approach. The empirical results reveal a high degree of inefficiency in the health facilities studied. The mean bias corrected technical efficiency scores taking quality into consideration varied between 22% and 65% depending on the data envelopment analysis (DEA) model specification. The number of additional HIV services in the maternal and child health unit, public ownership and facility type, have a positive and significant effect on technical efficiency. However, number of additional HIV and STI services provided in the same clinical room, proportion of clinical staff to overall staff, proportion of HIV services provided, and rural location had a negative and significant effect on technical efficiency. The low estimates of technical efficiency and mixed effects of the measures of integration on efficiency challenge the notion that integration of HIV and SRH services may substantially improve the technical efficiency of health facilities. The analysis of quality and efficiency as separate dimensions of performance suggest that efficiency may be achieved without sacrificing quality. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  17. Important Non-Technical Skills in Video-Assisted Thoracoscopic Surgery Lobectomy: Team Perspectives.

    PubMed

    Gjeraa, Kirsten; Mundt, Anna S; Spanager, Lene; Hansen, Henrik J; Konge, Lars; Petersen, René H; Østergaard, Doris

    2017-07-01

    Safety in the operating room is dependent on the team's non-technical skills. The importance of non-technical skills appears to be different for minimally invasive surgery as compared with open surgery. The aim of this study was to identify which non-technical skills are perceived by team members to be most important for patient safety, in the setting of video-assisted thoracoscopic surgery (VATS) lobectomy. This was an explorative, semistructured interview-based study with 21 participants from all four thoracic surgery centers in Denmark that perform VATS lobectomy. Data analysis was deductive, and directed content analysis was used to code the text into the Oxford Non-Technical Skills system for evaluating operating teams' non-technical skills. The most important non-technical skills described by the VATS teams were planning and preparation, situation awareness, problem solving, leadership, risk assessment, and teamwork. These non-technical skills enabled the team to achieve shared mental models, which in turn facilitated their efforts to anticipate next steps. This was viewed as important by the participants as they saw VATS lobectomy as a high-risk procedure with complementary and overlapping scopes of practice between surgical and anesthesia subteams. This study identified six non-technical skills that serve as the foundation for shared mental models of the patient, the current situation, and team resources. These findings contribute three important additions to the shared mental model construct: planning and preparation, risk assessment, and leadership. Shared mental models are crucial for patient safety because they enable VATS teams to anticipate problems through adaptive patterns of both implicit and explicit coordination. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  18. INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTHWEST. INL PHOTO NUMBER HD-54-19-2. Mike Crane, Photographer, 8/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  19. First-of-A-Kind Control Room Modernization Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Kenneth David

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less

  20. [Advanced Trauma Life Support (ATLS) in the emergency room. Is it suitable as an SOP?].

    PubMed

    Shafizadeh, S; Tjardes, T; Steinhausen, E; Balke, M; Paffrath, T; Bouillon, B; Bäthis, H

    2010-08-01

    There is clinical evidence that a standardized management of trauma patients in the emergency room improves outcome. ATLS is a training course that teaches a systematic approach to the trauma patient in the emergency room. The aims are a rapid and accurate assessment of the patient's physiologic status, treatment according to priorities, and making decisions on whether the local resources are sufficient for adequate definitive treatment of the patient or if transfer to a trauma center is necessary. Above all it is important to prevent secondary injury, to realize timing as a relevant factor in the initial treatment, and to assure a high standard of care. A standard operating procedure (SOP) exactly regulates the approach to trauma patients and determines the responsibilities of the involved faculties. An SOP moreover incorporates the organizational structure in the treatment of trauma patients as well as the necessary technical equipment and staff requirements. To optimize process and result quality, priorities are in the fields of medical fundamentals of trauma care, education, and fault management. SOPs and training courses increase the process and result quality in the treatment of the trauma patient in the emergency room. These programs should be based on the special demands of the physiology of the trauma as well as the structural specifics of the hospital. ATLS does not equal an SOP but it qualifies as a standardized concept for management of trauma patients in the emergency room.

  1. Computers in the exam room: differences in physician-patient interaction may be due to physician experience.

    PubMed

    Rouf, Emran; Whittle, Jeff; Lu, Na; Schwartz, Mark D

    2007-01-01

    The use of electronic medical records can improve the technical quality of care, but requires a computer in the exam room. This could adversely affect interpersonal aspects of care, particularly when physicians are inexperienced users of exam room computers. To determine whether physician experience modifies the impact of exam room computers on the physician-patient interaction. Cross-sectional surveys of patients and physicians. One hundred fifty five adults seen for scheduled visits by 11 faculty internists and 12 internal medicine residents in a VA primary care clinic. Physician and patient assessment of the effect of the computer on the clinical encounter. Patients seeing residents, compared to those seeing faculty, were more likely to agree that the computer adversely affected the amount of time the physician spent talking to (34% vs 15%, P = 0.01), looking at (45% vs 24%, P = 0.02), and examining them (32% vs 13%, P = 0.009). Moreover, they were more likely to agree that the computer made the visit feel less personal (20% vs 5%, P = 0.017). Few patients thought the computer interfered with their relationship with their physicians (8% vs 8%). Residents were more likely than faculty to report these same adverse effects, but these differences were smaller and not statistically significant. Patients seen by residents more often agreed that exam room computers decreased the amount of interpersonal contact. More research is needed to elucidate key tasks and behaviors that facilitate doctor-patient communication in such a setting.

  2. Western Aeronautical Test Range (WATR) mission control Blue room

    NASA Image and Video Library

    1994-12-05

    Mission control Blue Room, seen here, in building 4800 at NASA's Dryden Flight Research Center, is part of the Western Aeronautical Test Range (WATR). All aspects of a research mission are monitored from one of two of these control rooms at Dryden. The WATR consists of a highly automated complex of computer controlled tracking, telemetry, and communications systems and control room complexes that are capable of supporting any type of mission ranging from system and component testing, to sub-scale and full-scale flight tests of new aircraft and reentry systems. Designated areas are assigned for spin/dive tests, corridors are provided for low, medium, and high-altitude supersonic flight, and special STOL/VSTOL facilities are available at Ames Moffett and Crows Landing. Special use airspace, available at Edwards, covers approximately twelve thousand square miles of mostly desert area. The southern boundary lies to the south of Rogers Dry Lake, the western boundary lies midway between Mojave and Bakersfield, the northern boundary passes just south of Bishop, and the eastern boundary follows about 25 miles west of the Nevada border except in the northern areas where it crosses into Nevada.

  3. Western Aeronautical Test Range (WATR) mission control Gold room

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Mission control Gold room is seen here, located at the Dryden Flight Research Center of the Western Aeronautical Test Range (WATR). All aspects of a research mission are monitored from one of two of these control rooms at Dryden. The WATR consists of a highly automated complex of computer controlled tracking, telemetry, and communications systems and control room complexes that are capable of supporting any type of mission ranging from system and component testing, to sub-scale and full-scale flight tests of new aircraft and reentry systems. Designated areas are assigned for spin/dive tests, corridors are provided for low, medium, and high-altitude supersonic flight, and special STOL/VSTOL facilities are available at Ames Moffett and Crows Landing. Special use airspace, available at Edwards, covers approximately twelve thousand square miles of mostly desert area. The southern boundary lies to the south of Rogers Dry Lake, the western boundary lies midway between Mojave and Bakersfield, the northern boundary passes just south of Bishop, and the eastern boundary follows about 25 miles west of the Nevada border except in the northern areas where it crosses into Nevada.

  4. Safe and Sanitary.

    ERIC Educational Resources Information Center

    Turner, Ed; Hauser, Dan

    1994-01-01

    Explains how daily maintenance and design planning can reduce the potential safety hazards found in athletic-facility locker rooms. Topics include designing locker rooms for visual openness and traffic control, providing non-slip surfaces and proper drainage, installing ventilation systems that can handle the moisture produced in locker rooms,…

  5. 7. INTERIOR OF SOUTH MAIN BUILDING ROOM AND OPEN DOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. INTERIOR OF SOUTH MAIN BUILDING ROOM AND OPEN DOOR TO SHED ADDITION, OPEN DOOR TO NORTH MAIN BUILDING ROOM, AND CLOSED DOOR TO BATHROOM. VIEW TO NORTHWEST. - Bishop Creek Hydroelectric System, Control Station, Hydrographer's Office, Bishop Creek, Bishop, Inyo County, CA

  6. ETR CONTROL BUILDING, TRA647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR CONTROL BUILDING, TRA-647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT PANELS AT REAR OF OPERATOR'S CONSOLE GAVE OPERATOR STATUS OF REACTOR PERFORMANCE, COOLANT-WATER CHARACTERISTICS AND OTHER INDICATORS. WINDOWS AT RIGHT LOOKED INTO ETR BUILDING FIRST FLOOR. CAMERA FACING EAST. INL NEGATIVE NO. HD42-6. Mike Crane, Photographer, 3/2004 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  7. 116. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (206), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    116. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (206), LSB (BLDG. 751), WITH CABINETS ON EAST SIDE OF ROOM FACING WEST. THE ROW OF CABINETS ON EAST SIDE OF ROOM INCLUDES LEFT TO RIGHT: CABLE DISTRIBUTION UNITS, AUTOPILOT CONTROLS, AND POWER DISTRIBUTION UNITS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. Disruptive behaviour in the perioperative setting: a contemporary review.

    PubMed

    Villafranca, Alexander; Hamlin, Colin; Enns, Stephanie; Jacobsohn, Eric

    2017-02-01

    Disruptive behaviour, which we define as behaviour that does not show others an adequate level of respect and causes victims or witnesses to feel threatened, is a concern in the operating room. This review summarizes the current literature on disruptive behaviour as it applies to the perioperative domain. Searches of MEDLINE ® , Scopus™, and Google books identified articles and monographs of interest, with backreferencing used as a supplemental strategy. Much of the data comes from studies outside the operating room and has significant methodological limitations. Disruptive behaviour has intrapersonal, interpersonal, and organizational causes. While fewer than 10% of clinicians display disruptive behaviour, up to 98% of clinicians report witnessing disruptive behaviour in the last year, 70% report being treated with incivility, and 36% report being bullied. This type of conduct can have many negative ramifications for clinicians, students, and institutions. Although the evidence regarding patient outcomes is primarily based on clinician perceptions, anecdotes, and expert opinion, this evidence supports the contention of an increase in morbidity and mortality. The plausible mechanism for this increase is social undermining of teamwork, communication, clinical decision-making, and technical performance. The behavioural responses of those who are exposed to such conduct can positively or adversely moderate the consequences of disruptive behaviour. All operating room professions are involved, with the rank order (from high to low) being surgeons, nurses, anesthesiologists, and "others". The optimal approaches to the prevention and management of disruptive behaviour are uncertain, but they include preventative and professional development courses, training in soft skills and teamwork, institutional efforts to optimize the workplace, clinician contracts outlining the clinician's (and institution's) responsibilities, institutional policies that are monitored and enforced, regular performance feedback, and clinician coaching/remediation as required. Disruptive behaviour remains a part of operating room culture, with many associated deleterious effects. There is a widely accepted view that disruptive behaviour can lead to increased patient morbidity and mortality. This is mechanistically plausible, but more rigorous studies are required to confirm the effects and estimate their magnitude. An important measure that individual clinicians can take is to monitor and control their own behaviour, including their responses to disruptive behaviour.

  9. APOLLO XIII CREW - MISSION OPERATIONS CONTROL ROOM (MOCR) - APOLLO XII - LUNAR EXTRAVEHICULAR ACTIVITY (EVA) - MSC

    NASA Image and Video Library

    1969-11-21

    S69-59525 (19 Nov. 1969) --- Overall view of activity in the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), Building 30, during the Apollo 12 lunar landing mission. When this picture was made the first Apollo 12 extravehicular activity (EVA) was being televised from the surface of the moon. Photo credit: NASA

  10. Teamwork and error in the operating room: analysis of skills and roles.

    PubMed

    Catchpole, K; Mishra, A; Handa, A; McCulloch, P

    2008-04-01

    To analyze the effects of surgical, anesthetic, and nursing teamwork skills on technical outcomes. The value of team skills in reducing adverse events in the operating room is presently receiving considerable attention. Current work has not yet identified in detail how the teamwork and communication skills of surgeons, anesthetists, and nurses affect the course of an operation. Twenty-six laparoscopic cholecystectomies and 22 carotid endarterectomies were studied using direct observation methods. For each operation, teams' skills were scored for the whole team, and for nursing, surgical, and anesthetic subteams on 4 dimensions (leadership and management [LM]; teamwork and cooperation; problem solving and decision making; and situation awareness). Operating time, errors in surgical technique, and other procedural problems and errors were measured as outcome parameters for each operation. The relationships between teamwork scores and these outcome parameters within each operation were examined using analysis of variance and linear regression. Surgical (F(2,42) = 3.32, P = 0.046) and anesthetic (F(2,42) = 3.26, P = 0.048) LM had significant but opposite relationships with operating time in each operation: operating time increased significantly with higher anesthetic but decreased with higher surgical LM scores. Errors in surgical technique had a strong association with surgical situation awareness (F(2,42) = 7.93, P < 0.001) in each operation. Other procedural problems and errors were related to the intraoperative LM skills of the nurses (F(5,1) = 3.96, P = 0.027). Detailed analysis of team interactions and dimensions is feasible and valuable, yielding important insights into relationships between nontechnical skills, technical performance, and operative duration. These results support the concept that interventions designed to improve teamwork and communication may have beneficial effects on technical performance and patient outcome.

  11. 3. NORTHEAST REAR, SHOWING CONCRETE ENCASEMENT FOR STAIRWAY LEADING FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. NORTHEAST REAR, SHOWING CONCRETE ENCASEMENT FOR STAIRWAY LEADING FROM INSTRUMENT ROOM TO UNDERGROUND FIRING CONTROL ROOM. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  12. 14. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic view of engineer in Building 100 control room examining data printout. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46210. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  13. 13. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic view of Building 100 control room, showing personnel with data recording instrumentation. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46211. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  14. PBF Control Building (PER619). Interior in data acquisition room showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior in data acquisition room showing data racks. The system recorded multiple channels of data during tests. INEEL negative no. HD-41-8-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  15. Identifying and training non-technical skills for teams in acute medicine

    PubMed Central

    Flin, R; Maran, N

    2004-01-01

    The aviation domain provides a better analogy for the "temporary" teams that are found in acute medical specialities than industrial or military teamwork research based on established teams. Crew resource management (CRM) training, which emphasises portable skills (for whatever crew a pilot is rostered to on a given flight), has been recognised to have potential application in medicine, especially for teams in the operating theatre, intensive care unit, and emergency room. Drawing on research from aviation psychology that produced the behavioural marker system NOTECHS for rating European pilots' non-technical skills for teamwork on the flightdeck, this paper outlines the Anaesthetists Non-Technical Skills behavioural rating system for anaesthetists working in operating theatre teams. This taxonomy was used as the design basis for a training course, Crisis Avoidance Resource Management for Anaesthetists used to develop these skills, based in an operating theatre simulator. Further developments of this training programme for teams in emergency medicine are outlined. PMID:15465960

  16. 2014 SRNL LDRD Annual Report, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mcwhorter, S.

    2015-03-15

    Laboratory Directed Research and Development is a congressionally authorized program that provides the ‘innovation inspiration’ from which many of the Laboratory’s multi-discipline advancements are made in both science and engineering technology. The program is the backbone for insuring that scientific, technical and engineering capabilities can meet current and future needs. It is an important tool in reducing the probability of technological surprise by allowing laboratory technical staff room to innovate and keep abreast of scientific breakthroughs. Drawing from the synergism among the EM and NNSA missions, and work from other federal agencies ensures that LDRD is the key element inmore » maintaining the vitality of SRNL’s technical programs. The LDRD program aims to position the Laboratory for new business in clean energy, national security, nuclear materials management and environmental stewardship by leveraging the unique capabilities of the Laboratory to yield foundational scientific research in core business areas, while aligning with SRS strategic initiatives and maintaining a vision for ultimate DOE applications.« less

  17. Chromatographic and spectroscopic methods for the determination of solvent properties of room temperature ionic liquids.

    PubMed

    Poole, Colin F

    2004-05-28

    Room temperature ionic liquids are novel solvents with favorable environmental and technical features. Synthetic routes to over 200 room temperature ionic liquids are known but for most ionic liquids physicochemical data are generally lacking or incomplete. Chromatographic and spectroscopic methods afford suitable tools for the study of solvation properties under conditions that approximate infinite dilution. Gas-liquid chromatography is suitable for the determination of gas-liquid partition coefficients and activity coefficients as well as thermodynamic constants derived from either of these parameters and their variation with temperature. The solvation parameter model can be used to define the contribution from individual intermolecular interactions to the gas-liquid partition coefficient. Application of chemometric procedures to a large database of system constants for ionic liquids indicates their unique solvent properties: low cohesion for ionic liquids with weakly associated ions compared with non-ionic liquids of similar polarity; greater hydrogen-bond basicity than typical polar non-ionic solvents; and a range of dipolarity/polarizability that encompasses the same range as occupied by the most polar non-ionic liquids. These properties can be crudely related to ion structures but further work is required to develop a comprehensive approach for the design of ionic liquids for specific applications. Data for liquid-liquid partition coefficients is scarce by comparison with gas-liquid partition coefficients. Preliminary studies indicate the possibility of using the solvation parameter model for interpretation of liquid-liquid partition coefficients determined by shake-flask procedures as well as the feasibility of using liquid-liquid chromatography for the convenient and rapid determination of liquid-liquid partition coefficients. Spectroscopic measurements of solvatochromic and fluorescent probe molecules in room temperature ionic liquids provide insights into solvent intermolecular interactions although interpretation of the different and generally uncorrelated "polarity" scales is sometimes ambiguous. All evidence points to the ionic liquids as a unique class of polar solvents suitable for technical development. In terms of designer solvents, however, further work is needed to fill the gaps in our knowledge of the relationship between ion structures and physicochemical properties.

  18. VIEW OF PDP ROOM WITH FLOOR AT LEVEL +15’ AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PDP ROOM WITH FLOOR AT LEVEL +15’ AND SHEAVE RACK ABOVE, LOOKING SOUTH. ON THE LEFT SIDE, CABLES GO THROUGH THE WALL TOWARD THE PDP CONTROL ROOM AREA - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  19. Master Console System Monitoring and Control Development

    NASA Technical Reports Server (NTRS)

    Brooks, Russell A.

    2013-01-01

    The Master Console internship during the spring of 2013 involved the development of firing room displays at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I developed a system health and status display for use by Master Console Operators (MCO) to monitor and verify the integrity of the servers, gateways, network switches, and firewalls used in the firing room.

  20. Effectiveness of in-room air filtration and dilution ventilation for tuberculosis infection control.

    PubMed

    Miller-Leiden, S; Lobascio, C; Nazaroff, W W; Macher, J M

    1996-09-01

    Tuberculosis (TB) is a public health problem that may pose substantial risks to health care workers and others. TB infection occurs by inhalation of airborne bacteria emitted by persons with active disease. We experimentally evaluated the effectiveness of in-room air filtration systems, specifically portable air filters (PAFs) and ceiling-mounted air filters (CMAFs), in conjunction with dilution ventilation, for controlling TB exposure in high-risk settings. For each experiment, a test aerosol was continuously generated and released into a full-sized room. With the in-room air filter and room ventilation system operating, time-averaged airborne particle concentrations were measured at several points. The effectiveness of in-room air filtration plus ventilation was determined by comparing particle concentrations with and without device operation. The four PAFs and three CMAFs we evaluated reduced room-average particle concentrations, typically by 30% to 90%, relative to a baseline scenario with two air-changes per hour of ventilation (outside air) only. Increasing the rate of air flow recirculating through the filter and/or air flow from the ventilation did not always increase effectiveness. Concentrations were generally higher near the emission source than elsewhere in the room. Both the air flow configuration of the filter and its placement within the room were important, influencing room air flow patterns and the spatial distribution of concentrations. Air filters containing efficient, but non-high efficiency particulate air (HEPA) filter media were as effective as air filters containing HEPA filter media.

  1. Effectiveness of In-Room Air Filtration and Dilution Ventilation for Tuberculosis Infection Control.

    PubMed

    Miller-Leiden, S; Lohascio, C; Nazaroff, W W; Macher, J M

    1996-09-01

    Tuberculosis (TB) is a public health problem that may pose substantial risks to health care workers and others. TB infection occurs by inhalation of airborne bacteria emitted by persons with active disease. We experimentally evaluated the effectiveness of in-room air filtration systems, specifically portable air filters (PAFs) and ceiling-mounted air filters (CMAFs), in conjunction with dilution ventilation, for controlling TB exposure in high-risk settings. For each experiment, a test aerosol was continuously generated and released into a full-sized room. With the in-room air filter and room ventilation system operating, time-averaged airborne particle concentrations were measured at several points. The effectiveness of in-room air filtration plus ventilation was determined by comparing particle concentrations with and without device operation. The four PAFs and three CMAFs we evaluated reduced room-average particle concentrations, typically by 30% to 90%, relative to a baseline scenario with two air-changes per hour of ventilation (outside air) only. Increasing the rate of air flow recirculating through the filter and/or air flow from the ventilation did not always increase effectiveness. Concentrations were generally higher near the emission source than elsewhere in the room. Both the air flow configuration of the filter and its placement within the room were important, influencing room air flow patterns and the spatial distribution of concentrations. Air filters containing efficient, but non-high efficiency particulate air (HEPA) filter media were as effective as air filters containing HEPA filter media.

  2. [Focus on the role of ventilation and ultraviolet rays in preventing nosocomial transmission of tuberculosis in health care facilities. Groupe de travail sur la prévention de la transmission nosocomiale de la tuberculose (Direction Générale de la Santé)].

    PubMed

    Desenclos, J C; Abiteboul, D; Bouvet, E; Brucker, G; Demeulemester, R; Haury, B; Huré, P; Leprince, A; Macrez, A; Mayaud, C

    1995-01-01

    Recent episodes of nosocomial tuberculosis, sometimes due to multiresistant strains, in HIV infected patients in the USA has led to the need for new prevention measures against the transmission of Mycobacterium tuberculosis in health care facilities. Tuberculosis is transmitted in Pflügge droplets generated when contagious persons cough. After drying, the droplets become aerosolized solid particles which are rapidly dispersed by air flow within the patient's room. People exposed to the same air are thus at high risk of being contaminated. If the air pressure in the patient's room is higher than the rest of the facility, the air coming form the room may contaminate personnel and other patients elsewhere in the facility. Infecting particles can be eliminated rapidly if the room air is ventilated outdoors. If the ventilation is strong enough so that air constantly circulates from the corridor into the room, infecting particles can no longer diffuse to the rest of the ward. It is also possible to use ultraviolet C light to disinfect the air, either within the room or within the ventilation system. These two basically simple systems are the fundamental environmental and prevention measures needed to limit tuberculosis spread in health care facilities. These methods are however technically complex, costly and require constant evaluation and maintenance by specialized personnel. In addition the potential side effects of ultraviolet waves could considerably reduce their application. These environmental methods, which are complementary methods, only have a meaning if the elementary measures for preventing the transmission of tuberculosis are correctly applied.(ABSTRACT TRUNCATED AT 250 WORDS)

  3. Can technical, functional and structural characteristics of dental units predict Legionella pneumophila and Pseudomonas aeruginosa contamination?

    PubMed

    Aprea, Luigi; Cannova, Lucia; Firenze, Alberto; Bivona, Maria S; Amodio, Emanuele; Romano, Nino

    2010-12-01

    Legionella pneumophila and Pseudomonas aeruginosa are common colonizers of water environments, particularly dental unit waterlines. The aim of this study was to assess whether the technical, functional and structural characteristics of dental units can influence the presence and the levels of opportunistic pathogens. Overall, 42 water samples were collected from dental units in a teaching hospital in Palermo, Italy, including 21 samples from the 21 taps supplied by the municipal water distribution system and 21 samples from oral rinsing cups at 21 dental units. L. pneumophila was present in 16 out of 21 water samples (76.2%) from dental units, and the median concentration was higher in samples from oral rinsing cups than in those from taps (P < 0.001). P. aeruginosa was equally distributed in water samples collected from oral rinsing cups and from taps. Some characteristics of dental units (age, number of chairs per room, number of patients per day and water temperature) were slightly associated with the presence of P. aeruginosa, but not with contamination by L. pneumophila. Our experience suggests that L. pneumophila is frequently detected in dental units, as reported in previous studies, whereas P. aeruginosa is not a frequent contaminant. As a consequence, microbiological control of water quality should be routinely performed, and should include the detection of opportunistic pathogens when bacterial contamination is expected.

  4. Exploratory Phase Transition-Based Switches Using Functional Oxides

    DTIC Science & Technology

    2011-02-02

    TECHNICAL REPORT Abstract Vanadium dioxide ( VO2 ) undergoes a sharp metal-insulator transition (MIT) in the vicinity of room temperature and there is...18 The mechanisms governing metal-insulator transition (MIT) in vanadium dioxide ( VO2 ) is an intensively explored subject in condensed matter...textured vanadium dioxide films were grown on single crystal Al2O3 (0001) substrates by RF-sputtering from a VO2 target (99.5%, AJA International Inc

  5. Digital X-Ray Imager Final Report CRADA No. TSB-1161-95

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Logan, C.; Toker, E.

    The global objective of this cooperation was to lower the cost and improve the quality of breast health care in the United States. We planned to achieve it by designing a very high performance digital radiography unit for breast surgical specimen radiography in the operating room. These technical goals needed to be achieved at reasonable manufacturing costs to enable MedOptics to achieve high market penetration at a profit.

  6. Anisotropy of the Mechanical Properties of TbF3 Crystals

    NASA Astrophysics Data System (ADS)

    Karimov, D. N.; Lisovenko, D. S.; Sizova, N. L.; Sobolev, B. P.

    2018-01-01

    TbF3 (sp. gr. Pnma) crystals up to 40 mm in diameter have been grown from melt by a Bridgman technique. The anisotropy of their mechanical properties is studied for the first time. the technical elasticity constants are calculated, and room-temperature values of Vickers microhardness for the (010) and (100) planes are measured. The shape of indentation impressions is found to correlate with Young's modulus anisotropy for TbF3 crystals.

  7. LPT. Shield test facility (TAN645 and 646). Sections show relationships ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-645 and -646). Sections show relationships among control rooms, coupling station, counting rooms, pools, equipment rooms, data room and other areas. Ralph M. Parsons 1229-17 ANP/GE-6-645-A-4. April 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 037-0645/0646-00-693-107350 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  8. Supplemental treatment of air in airborne infection isolation rooms using high-throughput in-room air decontamination units.

    PubMed

    Bergeron, Vance; Chalfine, Annie; Misset, Benoît; Moules, Vincent; Laudinet, Nicolas; Carlet, Jean; Lina, Bruno

    2011-05-01

    Evidence has recently emerged indicating that in addition to large airborne droplets, fine aerosol particles can be an important mode of influenza transmission that may have been hitherto underestimated. Furthermore, recent performance studies evaluating airborne infection isolation (AII) rooms designed to house infectious patients have revealed major discrepancies between what is prescribed and what is actually measured. We conducted an experimental study to investigate the use of high-throughput in-room air decontamination units for supplemental protection against airborne contamination in areas that host infectious patients. The study included both intrinsic performance tests of the air-decontamination unit against biological aerosols of particular epidemiologic interest and field tests in a hospital AII room under different ventilation scenarios. The unit tested efficiently eradicated airborne H5N2 influenza and Mycobacterium bovis (a 4- to 5-log single-pass reduction) and, when implemented with a room extractor, reduced the peak contamination levels by a factor of 5, with decontamination rates at least 33% faster than those achieved with the extractor alone. High-throughput in-room air treatment units can provide supplemental control of airborne pathogen levels in patient isolation rooms. Copyright © 2011 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  9. Too dog tired to avoid danger: self-control depletion in canines increases behavioral approach toward an aggressive threat.

    PubMed

    Miller, Holly C; DeWall, C Nathan; Pattison, Kristina; Molet, Mikaël; Zentall, Thomas R

    2012-06-01

    This study investigated whether initial self-control exertion by dogs would affect behavioral approach toward an aggressive threat. Dogs were initially required to exert self-control (sit still for 10 min) or not (caged for 10 min) before they were walked into a room in which a barking, growling dog was caged. Subject dogs spent 4 min in this room but were free to choose where in the room they spent their time. Approaching the unfamiliar conspecific was the predisposed response, but it was also the riskier choice (Lindsay, 2005). We found that following the exertion of self-control (in comparison with the control condition), dogs spent greater time in proximity to the aggressor. This pattern of behavior suggests that initial self-control exertion results in riskier and more impulsive decision making by dogs.

  10. 22 CFR 128.5 - Answer and demand for oral hearing.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... of State for Defense Trade Controls, SA-1, Room 1200, Department of State, Washington, DC 20522-0112... for Defense Trade Controls, SA-1, Room 1200, Department of State, Washington, DC 20037. [58 FR 39320... Section 128.5 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS...

  11. 144. VIEW OF EAST WALL OF CONTROL ROOM (214), LSB ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    144. VIEW OF EAST WALL OF CONTROL ROOM (214), LSB (BLDG. 751). PNEUMATIC SUPPLY PANEL ON LEFT; NITROGEN AND HELIUM PIPING AT TOP; PURGE PANEL AT BOTTOM OF PHOTOGRAPH. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  12. 15. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic view of engineer in Building 100 control room examining data printout. August 28, 1962. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-61500. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  13. Elements of a Sound Education.

    ERIC Educational Resources Information Center

    Brooks, Christopher

    2003-01-01

    Discusses what do to about the poor acoustics in school multipurpose rooms, asserting that because the auditorium is the most critical function of a typical multipurpose room, the stage house is superficial and noise control is essential. Features to enhance auditorium function include a performance platform and reverberation control. The article…

  14. 149. SOUTHEAST CORNER OF FUEL CONTROL ROOM (215), LSB (BLDG. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    149. SOUTHEAST CORNER OF FUEL CONTROL ROOM (215), LSB (BLDG. 751), WITH SKID 2 IN FOREGROUND; FUEL LINE TO LAUNCH VEHICLE ENTERING WALL ON LEFT BEHIND SKID 2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  15. 46 CFR 113.30-5 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SYSTEMS AND EQUIPMENT Internal Communications § 113.30-5 Requirements. (a) Communication. Each vessel must... engine control room. (6) Control room, if the vessel is a mobile offshore drilling unit. (7) The... or spaces used by the emergency squad are not next to the navigating bridge or, on a mobile offshore...

  16. VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF THE ELWHA POWERHOUSE, INCLUDING: METERS, PROTECTIVE RELAYS, AND SWITCHES. NOTE ADDITION OF PERSONAL COMPUTERS FOR POWER METERING AND OPERATIONS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  17. EDUCATION, CHILDREN AND COMFORT.

    ERIC Educational Resources Information Center

    Iowa Univ., Iowa City.

    TWO SIMILAR CLASSROOMS WERE SET UP IN THE LENNOX LIVING LABORATORY, DES MOINES, IOWA, ONE FOR EXPERIMENTAL GROUPS AND ONE FOR CONTROL GROUPS. TEMPERATURE, AIR CIRCULATION AND HUMIDITY CAN BE CONTROLLED AND MEASURED IN BOTH ROOMS. THE ROOMS ARE OF SIMILAR SIZE, LAYOUT AND CONSTRUCTION, THE THERMAL ENVIRONMENT BEING THE ONLY VARIABLE. THE FOLLOWING…

  18. Comparison of methods to control floor contamination in an animal research facility.

    PubMed

    Allen, Kenneth P; Csida, Tarrant; Leming, Jeaninne; Murray, Kathleen; Gauld, Stephen B; Thulin, Joseph

    2012-10-01

    The authors evaluated the effectiveness of adhesive mats, contamination control flooring, and shoe covers in decreasing the presence of microbial agents on animal holding room floors and footwear. Swab samples taken from animal holding room floors after the use of each product were compared with samples taken from rooms after no products were used. Swab samples were also taken from the heels and soles of the footwear of animal care staff before and after use of each product. The use of contamination control flooring or shoe covers significantly reduced the amount of organic material (as indicated by ATP levels measured by a luminometer) present on floors. Bacterial and ATP contamination of footwear was significantly lower after the use of shoe covers than after the use of adhesive mats or contamination control flooring, and the use of shoe covers led to a greater decrease in contamination before and after use than did use of either of the other two products. Although shoe covers were superior to both adhesive mats and contamination control flooring for decreasing contamination of animal room floors and footwear, facilities must take into account the contamination control standards required, the cost of the product, and the labor and time associated with product use when deciding which contamination control practices to implement.

  19. 123. UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751). PUMP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751). PUMP ON LEFT; HYDRAULIC CONTROL PANEL FOR UMBILICAL MAST AND TRENCH DOORS IN CENTER OF ROOM, FACING WEST. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  20. Operating room integration and telehealth.

    PubMed

    Bucholz, Richard D; Laycock, Keith A; McDurmont, Leslie

    2011-01-01

    The increasing use of advanced automated and computer-controlled systems and devices in surgical procedures has resulted in problems arising from the crowding of the operating room with equipment and the incompatible control and communication standards associated with each system. This lack of compatibility between systems and centralized control means that the surgeon is frequently required to interact with multiple computer interfaces in order to obtain updates and exert control over the various devices at his disposal. To reduce this complexity and provide the surgeon with more complete and precise control of the operating room systems, a unified interface and communication network has been developed. In addition to improving efficiency, this network also allows the surgeon to grant remote access to consultants and observers at other institutions, enabling experts to participate in the procedure without having to travel to the site.

Top