Sample records for technical cost modelling

  1. Modeling technical change in climate analysis: evidence from agricultural crop damages.

    PubMed

    Ahmed, Adeel; Devadason, Evelyn S; Al-Amin, Abul Quasem

    2017-05-01

    This study accounts for the Hicks neutral technical change in a calibrated model of climate analysis, to identify the optimum level of technical change for addressing climate changes. It demonstrates the reduction to crop damages, the costs to technical change, and the net gains for the adoption of technical change for a climate-sensitive Pakistan economy. The calibrated model assesses the net gains of technical change for the overall economy and at the agriculture-specific level. The study finds that the gains of technical change are overwhelmingly higher than the costs across the agriculture subsectors. The gains and costs following technical change differ substantially for different crops. More importantly, the study finds a cost-effective optimal level of technical change that potentially reduces crop damages to a minimum possible level. The study therefore contends that the climate policy for Pakistan should consider the role of technical change in addressing climate impacts on the agriculture sector.

  2. Cost model validation: a technical and cultural approach

    NASA Technical Reports Server (NTRS)

    Hihn, J.; Rosenberg, L.; Roust, K.; Warfield, K.

    2001-01-01

    This paper summarizes how JPL's parametric mission cost model (PMCM) has been validated using both formal statistical methods and a variety of peer and management reviews in order to establish organizational acceptance of the cost model estimates.

  3. Construction cost forecast model : model documentation and technical notes.

    DOT National Transportation Integrated Search

    2013-05-01

    Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...

  4. Improving Space Project Cost Estimating with Engineering Management Variables

    NASA Technical Reports Server (NTRS)

    Hamaker, Joseph W.; Roth, Axel (Technical Monitor)

    2001-01-01

    Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

  5. Cost drivers and resource allocation in military health care systems.

    PubMed

    Fulton, Larry; Lasdon, Leon S; McDaniel, Reuben R

    2007-03-01

    This study illustrates the feasibility of incorporating technical efficiency considerations in the funding of military hospitals and identifies the primary drivers for hospital costs. Secondary data collected for 24 U.S.-based Army hospitals and medical centers for the years 2001 to 2003 are the basis for this analysis. Technical efficiency was measured by using data envelopment analysis; subsequently, efficiency estimates were included in logarithmic-linear cost models that specified cost as a function of volume, complexity, efficiency, time, and facility type. These logarithmic-linear models were compared against stochastic frontier analysis models. A parsimonious, three-variable, logarithmic-linear model composed of volume, complexity, and efficiency variables exhibited a strong linear relationship with observed costs (R(2) = 0.98). This model also proved reliable in forecasting (R(2) = 0.96). Based on our analysis, as much as $120 million might be reallocated to improve the United States-based Army hospital performance evaluated in this study.

  6. An Assessment of Technical and Production Risks of Candidate Low-Cost Attitude/Heading Reference Systems(AHRS)

    NASA Technical Reports Server (NTRS)

    Yuchnovicz, Daniel; Burgess, Malcolm; Hammers, William

    1999-01-01

    This report provides an assessment of technical and production risks of candidate low-cost attitude/heading reference systems (AHRS) for use in the Advanced General Aviation Transport Experiments (AGATE) airplanes. A low-cost AHRS is a key component of modem "glass cockpit" flight displays for General Aviation (GA) aircraft. The technical capabilities of several candidate low-cost AHRS were examined and described along with the technical issues involved with using all solid-state components for attitude measurement. An economic model was developed which describes the expected profit, rate of return, and volume requirements for the manufacture of low-cost AHRS for GA aircraft in the 2000 to 2020 time frame. The model is the result of interviews with GA airframe manufacturers, avionics manufacturers and historical analysis of avionics of similar complexity. The model shows that a manufacturer will break even after three years of AHRS production, realizing an 18 percent rate of return (23 percent profit) on an investment of $3.5M over the 20 year period. A start-up production estimate showed costs of $6-12M for a new company to build and certify an AHRS from scratch, considered to be a high-risk proposition, versus $0.25-0.75M for an experienced avionics manufacturer to manufacture a design under license, a low-risk proposition.

  7. Cost Estimation Model for Alternative Formats and Delivery Modes. Technical Report No. 10.

    ERIC Educational Resources Information Center

    Bramble, William J.; And Others

    The Appalachian Education Satellite Project (AESP) was designed to apply communications satellite technology to the task of improving the quality of education in Appalachia. This report is the 10th in a 12 volume series. To justify the cost of using the satellite method, a cost model was developed. This cost model provided information on: (1) the…

  8. Exploring NASA Human Spaceflight and Pioneering Scenarios

    NASA Technical Reports Server (NTRS)

    Zapata, Edgar; Wilhite, Alan

    2015-01-01

    The life cycle cost analysis of space exploration scenarios is explored via a merger of (1) scenario planning, separating context and (2) modeling and analysis of specific content. Numerous scenarios are presented, leading to cross-cutting recommendations addressing life cycle costs, productivity, and approaches applicable to any scenarios. Approaches address technical and non-technical factors.

  9. Cost Efficiency in the University: A Departmental Evaluation Model

    ERIC Educational Resources Information Center

    Gimenez, Victor M.; Martinez, Jose Luis

    2006-01-01

    This article presents a model for the analysis of cost efficiency within the framework of data envelopment analysis models. It calculates the cost excess, separating a unit of production from its optimal or frontier levels, and, at the same time, breaks these excesses down into three explanatory factors: (a) technical inefficiency, which depends…

  10. Cost and Performance Model for Photovoltaic Systems

    NASA Technical Reports Server (NTRS)

    Borden, C. S.; Smith, J. H.; Davisson, M. C.; Reiter, L. J.

    1986-01-01

    Lifetime cost and performance (LCP) model assists in assessment of design options for photovoltaic systems. LCP is simulation of performance, cost, and revenue streams associated with photovoltaic power systems connected to electric-utility grid. LCP provides user with substantial flexibility in specifying technical and economic environment of application.

  11. Global anthropogenic methane emissions 2005-2030: technical mitigation potentials and costs

    NASA Astrophysics Data System (ADS)

    Höglund-Isaksson, L.

    2012-10-01

    This paper presents estimates of current and future global anthropogenic methane emissions, their technical mitigation potential and associated costs for the period 2005 to 2030. The analysis uses the GAINS model framework to estimate emissions, mitigation potentials and costs for all major sources of anthropogenic methane for 83 countries/regions, which are aggregated to produce global estimates. Global emissions are estimated at 323 Mt methane in 2005, with an expected increase to 414 Mt methane in 2030. The technical mitigation potential is estimated at 195 Mt methane in 2030, whereof about 80 percent is found attainable at a marginal cost less than 20 Euro t-1 CO2eq when using a social planner cost perspective. With a private investor cost perspective, the corresponding fraction is only 30 percent. Major uncertainty sources in emission estimates are identified and discussed.

  12. Analysis and assessment of STES technologies

    NASA Astrophysics Data System (ADS)

    Brown, D. R.; Blahnik, D. E.; Huber, H. D.

    1982-12-01

    Technical and economic assessments completed in FY 1982 in support of the Seasonal Thermal Energy Storage (STES) segment of the Underground Energy Storage Program included: (1) a detailed economic investigation of the cost of heat storage in aquifers, (2) documentation for AQUASTOR, a computer model for analyzing aquifer thermal energy storage (ATES) coupled with district heating or cooling, and (3) a technical and economic evaluation of several ice storage concepts. This paper summarizes the research efforts and main results of each of these three activities. In addition, a detailed economic investigation of the cost of chill storage in aquifers is currently in progress. The work parallels that done for ATES heat storage with technical and economic assumptions being varied in a parametric analysis of the cost of ATES delivered chill. The computer model AQUASTOR is the principal analytical tool being employed.

  13. Trends in highway construction costs in Louisiana : technical summary.

    DOT National Transportation Integrated Search

    1999-09-01

    The objectives of this study are to observe past trends in highway construction costs in Louisiana, identify factors that determine these costs, quantify their impact, and establish a model that can be used to predict future construction cost in Loui...

  14. [Mathematical model of technical equipment of a clinical-diagnostic laboratory].

    PubMed

    Bukin, S I; Busygin, D V; Tilevich, M E

    1990-01-01

    The paper is concerned with the problems of technical equipment of standard clinico-diagnostic laboratories (CDL) in this country. The authors suggest a mathematic model that may minimize expenditures for laboratory studies. The model enables the following problems to be solved: to issue scientifically-based recommendations for technical equipment of CDL; to validate the medico-technical requirements for newly devised items; to select the optimum types of uniform items; to define optimal technical decisions at the stage of the design; to determine the lab assistant's labour productivity and the cost of some investigations; to compute the medical laboratory engineering requirement for treatment and prophylactic institutions of this country.

  15. Meningomyelocele Simulation Model: Pre-surgical Management–Technical Report

    PubMed Central

    Angert, Robert M

    2018-01-01

    This technical report describes the creation of a myelomeningocele model of a newborn baby. This is a simple, low-cost, and easy-to-assemble model that allows the medical team to practice the delivery room management of a newborn with myelomeningocele. The report includes scenarios and a suggested checklist with which the model can be employed. PMID:29713576

  16. Meningomyelocele Simulation Model: Pre-surgical Management-Technical Report.

    PubMed

    Rosen, Orna; Angert, Robert M

    2018-02-26

    This technical report describes the creation of a myelomeningocele model of a newborn baby. This is a simple, low-cost, and easy-to-assemble model that allows the medical team to practice the delivery room management of a newborn with myelomeningocele. The report includes scenarios and a suggested checklist with which the model can be employed.

  17. Organizational Cost of Quality Improvement for Depression Care

    PubMed Central

    Liu, Chuan-Fen; Rubenstein, Lisa V; Kirchner, JoAnn E; Fortney, John C; Perkins, Mark W; Ober, Scott K; Pyne, Jeffrey M; Chaney, Edmund F

    2009-01-01

    Objective We documented organizational costs for depression care quality improvement (QI) to develop an evidence-based, Veterans Health Administration (VA) adapted depression care model for primary care practices that performed well for patients, was sustained over time, and could be spread nationally in VA. Data Sources and Study Setting Project records and surveys from three multistate VA administrative regions and seven of their primary care practices. Study Design Descriptive analysis. Data Collection We documented project time commitments and expenses for 86 clinical QI and 42 technical expert support team participants for 4 years from initial contact through care model design, Plan–Do–Study–Act cycles, and achievement of stable workloads in which models functioned as routine care. We assessed time, salary costs, and costs for conference calls, meetings, e-mails, and other activities. Principle Findings Over an average of 27 months, all clinics began referring patients to care managers. Clinical participants spent 1,086 hours at a cost of $84,438. Technical experts spent 2,147 hours costing $197,787. Eighty-five percent of costs derived from initial regional engagement activities and care model design. Conclusions Organizational costs of the QI process for depression care in a large health care system were significant, and should be accounted for when planning for implementation of evidence-based depression care. PMID:19146566

  18. Process-Based Cost Modeling of Photonics Manufacture: The Cost Competitiveness of Monolithic Integration of a 1550-nm DFB Laser and an Electroabsorptive Modulator on an InP Platform

    NASA Astrophysics Data System (ADS)

    Fuchs, Erica R. H.; Bruce, E. J.; Ram, R. J.; Kirchain, Randolph E.

    2006-08-01

    The monolithic integration of components holds promise to increase network functionality and reduce packaging expense. Integration also drives down yield due to manufacturing complexity and the compounding of failures across devices. Consensus is lacking on the economically preferred extent of integration. Previous studies on the cost feasibility of integration have used high-level estimation methods. This study instead focuses on accurate-to-industry detail, basing a process-based cost model of device manufacture on data collected from 20 firms across the optoelectronics supply chain. The model presented allows for the definition of process organization, including testing, as well as processing conditions, operational characteristics, and level of automation at each step. This study focuses on the cost implications of integration of a 1550-nm DFB laser with an electroabsorptive modulator on an InP platform. Results show the monolithically integrated design to be more cost competitive over discrete component options regardless of production scale. Dominant cost drivers are packaging, testing, and assembly. Leveraging the technical detail underlying model projections, component alignment, bonding, and metal-organic chemical vapor deposition (MOCVD) are identified as processes where technical improvements are most critical to lowering costs. Such results should encourage exploration of the cost advantages of further integration and focus cost-driven technology development.

  19. A cost and technical efficiency analysis of two alternative models for implementing the basic package of health services in Afghanistan.

    PubMed

    Blaakman, Aaron Philip; Salehi, Ahmad Shah; Boitard, Romain

    2014-01-01

    Since 2003, the Afghan Ministry of Public Health (MoPH) and international partners have directed a contracting-out model through which non-governmental organisations (NGOs) deliver the Basic Package of Health Services (BPHS) in 31 of the 34 Afghan provinces. The MoPH also managed health service delivery in three provinces under an alternative initiative entitled Strengthening Mechanisms (SM). In 2011, under the authority of the MoPH and Delegation of the European Union to Afghanistan, EPOS Health Management conducted a cost and technical efficiency study of the contracting-out and SM mechanisms in six provinces to examine economic trade-offs in the provision of the BPHS. The study provides analyses of all resource inputs and primary outputs of the BPHS in the six provinces during 2008 and 2009. The authors examined technical efficiency using Data Envelopment Analysis (DEA) at the BPHS facility level. Cost analysis results indicate that the weighted average cost per BPHS outpatient visit totalled $3.41 in the SM provinces and $5.39 in the NGO-led provinces in 2009. Furthermore, the data envelopment analyses (DEAs) indicate that facilities in the three NGO-led provinces scored 0.168 points higher on the DEA scale (0-1) than SM facilities. The authors conclude that an approximate 60% increase in costs yielded a 16.8% increase in technical efficiency in the delivery of the BPHS during 2009 in the six provinces.

  20. Assessing the prospective resource base for enhanced geothermal systems in Europe

    NASA Astrophysics Data System (ADS)

    Limberger, J.; Calcagno, P.; Manzella, A.; Trumpy, E.; Boxem, T.; Pluymaekers, M. P. D.; van Wees, J.-D.

    2014-12-01

    In this study the resource base for EGS (enhanced geothermal systems) in Europe was quantified and economically constrained, applying a discounted cash-flow model to different techno-economic scenarios for future EGS in 2020, 2030, and 2050. Temperature is a critical parameter that controls the amount of thermal energy available in the subsurface. Therefore, the first step in assessing the European resource base for EGS is the construction of a subsurface temperature model of onshore Europe. Subsurface temperatures were computed to a depth of 10 km below ground level for a regular 3-D hexahedral grid with a horizontal resolution of 10 km and a vertical resolution of 250 m. Vertical conductive heat transport was considered as the main heat transfer mechanism. Surface temperature and basal heat flow were used as boundary conditions for the top and bottom of the model, respectively. If publicly available, the most recent and comprehensive regional temperature models, based on data from wells, were incorporated. With the modeled subsurface temperatures and future technical and economic scenarios, the technical potential and minimum levelized cost of energy (LCOE) were calculated for each grid cell of the temperature model. Calculations for a typical EGS scenario yield costs of EUR 215 MWh-1 in 2020, EUR 127 MWh-1 in 2030, and EUR 70 MWh-1 in 2050. Cutoff values of EUR 200 MWh-1 in 2020, EUR 150 MWh-1 in 2030, and EUR 100 MWh-1 in 2050 are imposed to the calculated LCOE values in each grid cell to limit the technical potential, resulting in an economic potential for Europe of 19 GWe in 2020, 22 GWe in 2030, and 522 GWe in 2050. The results of our approach do not only provide an indication of prospective areas for future EGS in Europe, but also show a more realistic cost determined and depth-dependent distribution of the technical potential by applying different well cost models for 2020, 2030, and 2050.

  1. The Development of a Methodology for Estimating the Cost of Air Force On-the-Job Training.

    ERIC Educational Resources Information Center

    Samers, Bernard N.; And Others

    The Air Force uses a standardized costing methodology for resident technical training schools (TTS); no comparable methodology exists for computing the cost of on-the-job training (OJT). This study evaluates three alternative survey methodologies and a number of cost models for estimating the cost of OJT for airmen training in the Administrative…

  2. Payload analysis for space shuttle applications (study 2.2). Volume 3: Payload system operations analysis (task 2.2.1). [payload system operations analysis for shuttles and space tugs

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The technical and cost analysis that was performed for the payload system operations analysis is presented. The technical analysis consists of the operations for the payload/shuttle and payload/tug, and the spacecraft analysis which includes sortie, automated, and large observatory type payloads. The cost analysis includes the costing tradeoffs of the various payload design concepts and traffic models. The overall objectives of this effort were to identify payload design and operational concepts for the shuttle which will result in low cost design, and to examine the low cost design concepts to identify applicable design guidelines. The operations analysis examined several past and current NASA and DoD satellite programs to establish a shuttle operations model. From this model the analysis examined the payload/shuttle flow and determined facility concepts necessary for effective payload/shuttle ground operations. The study of the payload/tug operations was an examination of the various flight timelines for missions requiring the tug.

  3. A combined model to assess technical and economic consequences of changing conditions and management options for wastewater utilities.

    PubMed

    Giessler, Mathias; Tränckner, Jens

    2018-02-01

    The paper presents a simplified model that quantifies economic and technical consequences of changing conditions in wastewater systems on utility level. It has been developed based on data from stakeholders and ministries, collected by a survey that determined resulting effects and adapted measures. The model comprises all substantial cost relevant assets and activities of a typical German wastewater utility. It consists of three modules: i) Sewer for describing the state development of sewer systems, ii) WWTP for process parameter consideration of waste water treatment plants (WWTP) and iii) Cost Accounting for calculation of expenses in the cost categories and resulting charges. Validity and accuracy of this model was verified by using historical data from an exemplary wastewater utility. Calculated process as well as economic parameters shows a high accuracy compared to measured parameters and given expenses. Thus, the model is proposed to support strategic, process oriented decision making on utility level. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Impact of Research and Technical Change in Wildland Recreation: Evaluation Issues and Approaches

    Treesearch

    David N. Bengston; Zhi Xu

    1993-01-01

    The development and diffusion of new technologies have had tremendous impacts on wildland recreation in recent decades. This article examines the potential economic impacts of research and technical change in wildland recreation. Two evaluation models are presented, a cost-price approach and a research intensity model, which are intended to shed some light on the...

  5. WHITE BOX: LOW COST BOX FOR LAPAROSCOPIC TRAINING

    PubMed Central

    MARTINS, João Maximiliano Pedron; RIBEIRO, Roberto Vanin Pinto; CAVAZZOLA, Leandro Totti

    2015-01-01

    Background: Laparoscopic surgery is a reality in almost all surgical centers. Although with initial greater technical difficulty for surgeons, the rapid return to activities, less postoperative pain and higher quality aesthetic stimulates surgeons to evolve technically in this area. However, unlike open surgery where learning opportunities are more accessible, the laparoscopic training represents a challenge in surgeon formation. Aim: To present a low cost model for laparoscopic training box. Methods: This model is based in easily accessible materials; the equipment can be easily found based on chrome mini jet and passes rubber thread and a webcam attached to an aluminum handle. Results: It can be finalized in two days costing R$ 280,00 (US$ 90). Conclusion: It is possible to stimulate a larger number of surgeons to have self training in laparoscopy at low cost seeking to improve their surgical skills outside the operating room. PMID:26537148

  6. Gastroschisis Simulation Model: Pre-surgical Management Technical Report.

    PubMed

    Rosen, Orna; Angert, Robert M

    2017-03-22

    This technical report describes the creation of a gastroschisis model for a newborn. This is a simple, low-cost task trainer that provides the opportunity for Neonatology providers, including fellows, residents, nurse practitioners, physician assistants, and nurses, to practice the management of a baby with gastroschisis after birth and prior to surgery. Included is a suggested checklist with which the model can be employed. The details can be modified to suit different learning objectives.

  7. A Goal Programming/Constrained Regression Review of the Bell System Breakup.

    DTIC Science & Technology

    1985-05-01

    characteristically employ. 4 .- - -. . ,. - - ;--.. . . .. 2. MULTI-PRODUCT COST MODEL AND DATA DETAILS When technical efficiency (i.e. zero waste ) can be assumed...assumming, but we believe that it was probably technical (= zero waste ) efficiency by virtue of the following reasons. Scale efficien- cy was a

  8. Evaluation of Cost Leadership Strategy in Shipping Enterprises with Simulation Model

    NASA Astrophysics Data System (ADS)

    Ferfeli, Maria V.; Vaxevanou, Anthi Z.; Damianos, Sakas P.

    2009-08-01

    The present study will attempt the evaluation of cost leadership strategy that prevails in certain shipping enterprises and the creation of simulation models based on strategic model STAIR. The above model is an alternative method of strategic applications evaluation. This is held in order to be realised if the strategy of cost leadership creates competitive advantage [1] and this will be achieved via the technical simulation which appreciates the interactions between the operations of an enterprise and the decision-making strategy in conditions of uncertainty with reduction of undertaken risk.

  9. The Cost Efficiency Impact of the University Operation Fund on Public Universities in Taiwan

    ERIC Educational Resources Information Center

    Kuo, Jenn-Shyong; Ho, Yi-Cheng

    2008-01-01

    This study uses the stochastic frontier multiple-product cost function that is modeled after Battese and Coelli [Battese, G. E., & Coelli, T. J. (1995). "A model for technical inefficiency effects in a stochastic frontier production for panel data." "Empirical Economics" 20(2), 325-332.] in order to empirically measure the…

  10. Statistical Analysis of Complexity Generators for Cost Estimation

    NASA Technical Reports Server (NTRS)

    Rowell, Ginger Holmes

    1999-01-01

    Predicting the cost of cutting edge new technologies involved with spacecraft hardware can be quite complicated. A new feature of the NASA Air Force Cost Model (NAFCOM), called the Complexity Generator, is being developed to model the complexity factors that drive the cost of space hardware. This parametric approach is also designed to account for the differences in cost, based on factors that are unique to each system and subsystem. The cost driver categories included in this model are weight, inheritance from previous missions, technical complexity, and management factors. This paper explains the Complexity Generator framework, the statistical methods used to select the best model within this framework, and the procedures used to find the region of predictability and the prediction intervals for the cost of a mission.

  11. Gastroschisis Simulation Model: Pre-surgical Management Technical Report

    PubMed Central

    Angert, Robert M

    2017-01-01

    This technical report describes the creation of a gastroschisis model for a newborn. This is a simple, low-cost task trainer that provides the opportunity for Neonatology providers, including fellows, residents, nurse practitioners, physician assistants, and nurses, to practice the management of a baby with gastroschisis after birth and prior to surgery. Included is a suggested checklist with which the model can be employed. The details can be modified to suit different learning objectives. PMID:28439484

  12. The ISACA Business Model for Information Security: An Integrative and Innovative Approach

    NASA Astrophysics Data System (ADS)

    von Roessing, Rolf

    In recent years, information security management has matured into a professional discipline that covers both technical and managerial aspects in an organisational environment. Information security is increasingly dependent on business-driven parameters and interfaces to a variety of organisational units and departments. In contrast, common security models and frameworks have remained largely technical. A review of extant models ranging from [LaBe73] to more recent models shows that technical aspects are covered in great detail, while the managerial aspects of security are often neglected.Likewise, the business view on organisational security is frequently at odds with the demands of information security personnel or information technology management. In practice, senior and executive level management remain comparatively distant from technical requirements. As a result, information security is generally regarded as a cost factor rather than a benefit to the organisation.

  13. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  14. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  15. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  16. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Fee rates-(1) Costs for a manual search of technical data. Type Grade Hourly rate ($) Clerical E9/GS 8... costs for technical data. Type Cost ($) Aerial photograph, maps, specifications, permits, charts... microfilm indices, each .10 (e) Review time costs of technical data. Type Grade Hourly rate($) Clerical E9...

  17. A Cost-Effectiveness/Benefit Analysis Model for Postsecondary Vocational Programs. Technical Report.

    ERIC Educational Resources Information Center

    Kim, Jin Eun

    A cost-effectiveness/benefit analysis is defined as a technique for measuring the outputs of existing and new programs in relation to their specified program objectives, against the costs of those programs. In terms of its specific use, the technique is conceptualized as a systems analysis method, an evaluation method, and a planning tool for…

  18. Estimating the Effects of Teaching on the Costs of Inpatient Care: The Case of Radiology Treatments.

    ERIC Educational Resources Information Center

    Massell, Adele P.; Hosek, James R.

    The report investigates production and the cost effects of teaching within hospital departments. Models of primary production show that the cost effects of teaching are determined by the salaries paid to students (including residents, interns, medical students, and technical trainees) and physicians, by the levels of student inputs used in…

  19. Measuring and Costing Quality in Education: Using Quality and Productivity Methods To Improve Schools.

    ERIC Educational Resources Information Center

    Spanbauer, Stanley J.

    The Measurement and Costing Model (MCM) described in this book was developed and tested at Fox Valley Technical College (FVTC), Wisconsin, to enhance the college's quality improvement process and to serve as a guide to other institutions interested in improving their quality. The book presents a description of the model and outlines seven steps…

  20. Integrated orbital servicing and payloads study. Volume 2: Technical and cost analysis

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The details and background used in the investigation of orbital servicing and payloads are presented. Topics discussed include review of previous models, application of servicing to communications satellites, assessment of spacecraft servicing, cost of servicing, and launch vehicle effects on spacecraft.

  1. Optimization in the design of a 12 gigahertz low cost ground receiving system for broadcast satellites. Volume 1: System design, performance, and cost analysis

    NASA Technical Reports Server (NTRS)

    Ohkubo, K.; Han, C. C.; Albernaz, J.; Janky, J. M.; Lusignan, B. B.

    1972-01-01

    The technical and economical feasibility of using the 12 GHz band for broadcasting from satellites were examined. Among the assigned frequency bands for broadcast satellites, the 12 GHz band system offers the most channels. It also has the least interference on and from the terrestrial communication links. The system design and analysis are carried out on the basis of a decision analysis model. Technical difficulties in achieving low-cost 12 GHz ground receivers are solved by making use of a die cast aluminum packaging, a hybrid integrated circuit mixer, a cavity stabilized Gunn oscillator and other state-of-the-art microwave technologies for the receiver front-end. A working model was designed and tested, which used frequency modulation. A final design for the 2.6 GHz system ground receiver is also presented. The cost of the ground-terminal was analyzed and minimized for a given figure-of-merit (a ratio of receiving antenna gain to receiver system noise temperature). The results were used to analyze the performance and cost of the whole satellite system.

  2. NASA Technical Interchange Meeting (TIM): Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box

    NASA Technical Reports Server (NTRS)

    ONeil, D. A.; Craig, D. A.; Christensen, C. B.; Gresham, E. C.

    2005-01-01

    The objective of this Technical Interchange Meeting was to increase the quantity and quality of technical, cost, and programmatic data used to model the impact of investing in different technologies. The focus of this meeting was the Technology Tool Box (TTB), a database of performance, operations, and programmatic parameters provided by technologists and used by systems engineers. The TTB is the data repository used by a system of models known as the Advanced Technology Lifecycle Analysis System (ATLAS). This report describes the result of the November meeting, and also provides background information on ATLAS and the TTB.

  3. Strategy on energy saving reconstruction of distribution networks based on life cycle cost

    NASA Astrophysics Data System (ADS)

    Chen, Xiaofei; Qiu, Zejing; Xu, Zhaoyang; Xiao, Chupeng

    2017-08-01

    Because the actual distribution network reconstruction project funds are often limited, the cost-benefit model and the decision-making method are crucial for distribution network energy saving reconstruction project. From the perspective of life cycle cost (LCC), firstly the research life cycle is determined for the energy saving reconstruction of distribution networks with multi-devices. Then, a new life cycle cost-benefit model for energy-saving reconstruction of distribution network is developed, in which the modification schemes include distribution transformers replacement, lines replacement and reactive power compensation. In the operation loss cost and maintenance cost area, the operation cost model considering the influence of load season characteristics and the maintenance cost segmental model of transformers are proposed. Finally, aiming at the highest energy saving profit per LCC, a decision-making method is developed while considering financial and technical constraints as well. The model and method are applied to a real distribution network reconstruction, and the results prove that the model and method are effective.

  4. Design, processing and testing of LSI arrays: Hybrid microelectronics task

    NASA Technical Reports Server (NTRS)

    Himmel, R. P.; Stuhlbarg, S. M.; Ravetti, R. G.; Zulueta, P. J.

    1979-01-01

    Mathematical cost factors were generated for both hybrid microcircuit and printed wiring board packaging methods. A mathematical cost model was created for analysis of microcircuit fabrication costs. The costing factors were refined and reduced to formulae for computerization. Efficient methods were investigated for low cost packaging of LSI devices as a function of density and reliability. Technical problem areas such as wafer bumping, inner/outer leading bonding, testing on tape, and tape processing, were investigated.

  5. The financial implications of endovascular aneurysm repair in the cost containment era.

    PubMed

    Stone, David H; Horvath, Alexander J; Goodney, Philip P; Rzucidlo, Eva M; Nolan, Brian W; Walsh, Daniel B; Zwolak, Robert M; Powell, Richard J

    2014-02-01

    Endovascular aneurysm repair (EVAR) is associated with significant direct device costs. Such costs place EVAR at odds with efforts to constrain healthcare expenditures. This study examines the procedure-associated costs and operating margins associated with EVAR at a tertiary care academic medical center. All infrarenal EVARs performed from April 2011 to March 2012 were identified (n = 127). Among this cohort, 49 patients met standard commercial instruction for use guidelines, were treated using a single manufacturer device, and billed to Medicare diagnosis-related group (DRG) 238. Of these 49 patients, net technical operating margins (technical revenue minus technical cost) were calculated in conjunction with the hospital finance department. EVAR implant costs were determined for each procedure. DRG 238-associated costs and length of stay were benchmarked against other academic medical centers using University Health System Consortium 2012 data. Among the studied EVAR cohort (age 75, 82% male, mean length of stay, 1.7 days), mean technical costs totaled $31,672. Graft implants accounted for 52% of the allocated technical costs. Institutional overhead was 17% ($5495) of total technical costs. Net mean total technical EVAR-associated operating margins were -$4015 per procedure. Our institutional costs and length of stay, when benchmarked against comparable centers, remained in the lowest quartile nationally using University Health System Consortium costs for DRG 238. Stent graft price did not correlate with total EVAR market share. EVAR is currently associated with significant negative operating margins among Medicare beneficiaries. Currently, device costs account for over 50% of EVAR-associated technical costs and did not impact EVAR market share, reflecting an unawareness of cost differential among surgeons. These data indicate that EVAR must undergo dramatic care delivery redesign for this practice to remain sustainable. Copyright © 2014 Society for Vascular Surgery. Published by Mosby, Inc. All rights reserved.

  6. Energy. Application of solar energy in dwellings: A technical and economical analysis for the European community

    NASA Astrophysics Data System (ADS)

    1980-03-01

    The technical possibilities and economical limitations of solar heating systems for the application in swimming pools, hot water preparation, space heating and air conditioning were investigated. This analysis was performed for dwellings with special consideration of the climatic differences in each community. The computer program, which was used for solar system calculations, and all mathematical models, for technical and economical analysis were elucidated. In the technical and economical analysis, the most suitable solar system sizes for each community was determined. Four types of solar collectors were investigated. The single glass selective collector proved to be the most cost effective collector in all the above applications, provided the the additional cost for the selective coating is not more than 20DM/cu. From the results of the analysis certain recommendations were derived, which can improve the rapid implementation of solar heating systems into the market.

  7. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Trade, business, technical... Contracts With Commercial Organizations 31.205-43 Trade, business, technical, and professional activity costs. The following types of costs are allowable: (a) Memberships in trade, business, technical, and...

  8. NREL Suite of Tools for PV and Storage Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elgqvist, Emma M; Salasovich, James A

    Many different factors such as the solar resource, technology costs and incentives, utility cost and consumption, space available, and financial parameters impact the technical and economic potential of a PV project. NREL has developed techno-economic modeling tools that can be used to evaluate PV projects at a site.

  9. Designer's unified cost model

    NASA Technical Reports Server (NTRS)

    Freeman, William T.; Ilcewicz, L. B.; Swanson, G. D.; Gutowski, T.

    1992-01-01

    A conceptual and preliminary designers' cost prediction model has been initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design programs is being evaluated. The goal of this task is to establish theoretical cost functions that relate geometric design features to summed material cost and labor content in terms of process mechanics and physics. The output of the designers' present analytical tools will be input for the designers' cost prediction model to provide the designer with a data base and deterministic cost methodology that allows one to trade and synthesize designs with both cost and weight as objective functions for optimization. The approach, goals, plans, and progress is presented for development of COSTADE (Cost Optimization Software for Transport Aircraft Design Evaluation).

  10. Method for Household Refrigerators Efficiency Increasing

    NASA Astrophysics Data System (ADS)

    Lebedev, V. V.; Sumzina, L. V.; Maksimov, A. V.

    2017-11-01

    The relevance of working processes parameters optimization in air conditioning systems is proved in the work. The research is performed with the use of the simulation modeling method. The parameters optimization criteria are considered, the analysis of target functions is given while the key factors of technical and economic optimization are considered in the article. The search for the optimal solution at multi-purpose optimization of the system is made by finding out the minimum of the dual-target vector created by the Pareto method of linear and weight compromises from target functions of the total capital costs and total operating costs. The tasks are solved in the MathCAD environment. The research results show that the values of technical and economic parameters of air conditioning systems in the areas relating to the optimum solutions’ areas manifest considerable deviations from the minimum values. At the same time, the tendencies for significant growth in deviations take place at removal of technical parameters from the optimal values of both the capital investments and operating costs. The production and operation of conditioners with the parameters which are considerably deviating from the optimal values will lead to the increase of material and power costs. The research allows one to establish the borders of the area of the optimal values for technical and economic parameters at air conditioning systems’ design.

  11. Man power/cost estimation model: Automated planetary projects

    NASA Technical Reports Server (NTRS)

    Kitchen, L. D.

    1975-01-01

    A manpower/cost estimation model is developed which is based on a detailed level of financial analysis of over 30 million raw data points which are then compacted by more than three orders of magnitude to the level at which the model is applicable. The major parameter of expenditure is manpower (specifically direct labor hours) for all spacecraft subsystem and technical support categories. The resultant model is able to provide a mean absolute error of less than fifteen percent for the eight programs comprising the model data base. The model includes cost saving inheritance factors, broken down in four levels, for estimating follow-on type programs where hardware and design inheritance are evident or expected.

  12. Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

    NASA Astrophysics Data System (ADS)

    Vilja, John; Levack, Daniel

    1993-04-01

    The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

  13. Technical Review and Analysis of Center for Night Vision and Electro-Optics Life Cycle Cost Analysis Model (CNVEO LCCAM),

    DTIC Science & Technology

    1986-09-01

    source of the module/system. Source options are; battery, gas, cartridge, valve , and miscellaneous costs. NAMELIST OPERAT is used to compile the...hardware costs allocated to transportation for packing. TF1 = Initial transportation factor. WEIGHT = Shipping weight of total system. XSUM = System float...CD(6,I)+CD(9,I). . AROC(7,I) - Replenishment spares by year. CD(4,I) - Valve replacement cost by year. CD(5,I) = Cartridge replacement cost by year

  14. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    DTIC Science & Technology

    2008-02-01

    liabilities (e.g., accounts payable). This ratio can be compared to the firm’s weighted average cost of capital ( WACC ). WACC is the cost of debt plus the cost...RatioCost of Debt Marginal Tax Rate Risk-Free Rate Cost of Equity Risk Premium Industry Beta WACC Technical Risk CPFF/CPAF …. FFP/ MYP - Contract Choice...estimates the levered WACC as the discount rate, and finally calculates the NPV of the contract. Specific model input includes profit policy levers

  15. M-X Environmental Technical Report. Economic Model.

    DTIC Science & Technology

    1980-12-22

    TABLE PAGE C-4. Estimated off base school facility costs. 147 C-5. Estimated development costs to other public facilities. 148 C-6. Estimated utility... development costs. 149 C-7. Estimated non-residential building development . 151 E-1. Adjustments to baseline population projections to account for...the fringes of the rural deployment areas themselves. These metropolitan areas potentially would experience significant indirect employment growth as a

  16. Confronting Regulatory Cost and Quality Expectations. An Exploration of Technical Change in Minimum Efficiency Performance Standards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Margaret; Spurlock, C. Anna; Yang, Hung-Chia

    The dual purpose of this project was to contribute to basic knowledge about the interaction between regulation and innovation and to inform the cost and benefit expectations related to technical change which are embedded in the rulemaking process of an important area of national regulation. The area of regulation focused on here is minimum efficiency performance standards (MEPS) for appliances and other energy-using products. Relevant both to U.S. climate policy and energy policy for buildings, MEPS remove certain product models from the market that do not meet specified efficiency thresholds.

  17. The RCM: A Resource Management and Program Budgeting Approach for State and Local Educational Agencies.

    ERIC Educational Resources Information Center

    Chambers, Jay G.; Parrish, Thomas B.

    The Resource Cost Model (RCM) is a resource management system that combines the technical advantages of sophisticated computer simulation software with the practical benefits of group decision making to provide detailed information about educational program costs. The first section of this document introduces the conceptual framework underlying…

  18. Investment alternative: the status quo or PACS?

    NASA Astrophysics Data System (ADS)

    Vanden Brink, John A.; Cywinski, Jozef K.

    1990-08-01

    While the cost of Picture Archiving and Communication Systems (PACS) can be substantial, the cost of continuing with present manual methods may become prohibitive in growing departments as the need for additional space and personnel (both technical and professional) to meet the increasing requirements for all image management activities continues to grow. This will occur simultaneously with increasing pressures on problems of the present system, i.e., lost films, lost revenues, delayed reporting and longer diagnostic cycle times. Present methods of image archiving communication and management i.e. the relationship of procedure volume to VFE requirements for professional and technical personnel, costs of film, film storage space, and other performance factors are analyzed based on the database created by the Technology Marketing Group (TMG) computerized cost analysis model applied to over 50 US hospitals. Also, the model is used to provide the projected cost of present methods of film management for an average US 400 +bed hospital based on ten year growth rate assumptions. TMG PACS Tracking data provides confirmation of staffmg pattern correlation to procedure volume. The data presented in the paper provides a basis for comparing the investment in maintaining the status quo to an investment in PACS.

  19. Parametric Cost Modeling of Space Missions Using the Develop New Projects (DMP) Implementation Process

    NASA Technical Reports Server (NTRS)

    Rosenberg, Leigh; Hihn, Jairus; Roust, Kevin; Warfield, Keith

    2000-01-01

    This paper presents an overview of a parametric cost model that has been built at JPL to estimate costs of future, deep space, robotic science missions. Due to the recent dramatic changes in JPL business practices brought about by an internal reengineering effort known as develop new products (DNP), high-level historic cost data is no longer considered analogous to future missions. Therefore, the historic data is of little value in forecasting costs for projects developed using the DNP process. This has lead to the development of an approach for obtaining expert opinion and also for combining actual data with expert opinion to provide a cost database for future missions. In addition, the DNP cost model has a maximum of objective cost drivers which reduces the likelihood of model input error. Version 2 is now under development which expands the model capabilities, links it more tightly with key design technical parameters, and is grounded in more rigorous statistical techniques. The challenges faced in building this model will be discussed, as well as it's background, development approach, status, validation, and future plans.

  20. Communications network design and costing model technical manual

    NASA Technical Reports Server (NTRS)

    Logan, K. P.; Somes, S. S.; Clark, C. A.

    1983-01-01

    This computer model provides the capability for analyzing long-haul trunking networks comprising a set of user-defined cities, traffic conditions, and tariff rates. Networks may consist of all terrestrial connectivity, all satellite connectivity, or a combination of terrestrial and satellite connectivity. Network solutions provide the least-cost routes between all cities, the least-cost network routing configuration, and terrestrial and satellite service cost totals. The CNDC model allows analyses involving three specific FCC-approved tariffs, which are uniquely structured and representative of most existing service connectivity and pricing philosophies. User-defined tariffs that can be variations of these three tariffs are accepted as input to the model and allow considerable flexibility in network problem specification. The resulting model extends the domain of network analysis from traditional fixed link cost (distance-sensitive) problems to more complex problems involving combinations of distance and traffic-sensitive tariffs.

  1. Distributional Cost-Effectiveness Analysis

    PubMed Central

    Asaria, Miqdad; Griffin, Susan; Cookson, Richard

    2015-01-01

    Distributional cost-effectiveness analysis (DCEA) is a framework for incorporating health inequality concerns into the economic evaluation of health sector interventions. In this tutorial, we describe the technical details of how to conduct DCEA, using an illustrative example comparing alternative ways of implementing the National Health Service (NHS) Bowel Cancer Screening Programme (BCSP). The 2 key stages in DCEA are 1) modeling social distributions of health associated with different interventions, and 2) evaluating social distributions of health with respect to the dual objectives of improving total population health and reducing unfair health inequality. As well as describing the technical methods used, we also identify the data requirements and the social value judgments that have to be made. Finally, we demonstrate the use of sensitivity analyses to explore the impacts of alternative modeling assumptions and social value judgments. PMID:25908564

  2. Practicality of intraoperative teamwork assessments.

    PubMed

    Phitayakorn, Roy; Minehart, Rebecca; Pian-Smith, May C M; Hemingway, Maureen W; Milosh-Zinkus, Tanya; Oriol-Morway, Danika; Petrusa, Emil

    2014-07-01

    High-quality teamwork among operating room (OR) professionals is a key to efficient and safe practice. Quantification of teamwork facilitates feedback, assessment, and improvement. Several valid and reliable instruments are available for assessing separate OR disciplines and teams. We sought to determine the most feasible approach for routine documentation of teamwork in in-situ OR simulations. We compared rater agreement, hypothetical training costs, and feasibility ratings from five clinicians and two nonclinicians with instruments for assessment of separate OR groups and teams. Five teams of anesthesia or surgery residents and OR nurses (RN) or surgical technicians were videotaped in simulations of an epigastric hernia repair where the patient develops malignant hyperthermia. Two anesthesiologists, one OR clinical RN specialist, one educational psychologist, one simulation specialist, and one general surgeon discussed and then independently completed Anesthesiologists' Non-Technical Skills, Non-Technical Skills for Surgeons, Scrub Practitioners' List of Intraoperative Non-Technical Skills, and Observational Teamwork Assessment for Surgery forms to rate nontechnical performance of anesthesiologists, surgeons, nurses, technicians, and the whole team. Intraclass correlations of agreement ranged from 0.17-0.85. Clinicians' agreements were not different from nonclinicians'. Published rater training was 4 h for Anesthesiologists' Non-Technical Skills and Scrub Practitioners' List of Intraoperative Non-Technical Skills, 2.5 h for Non-Technical Skills for Surgeons, and 15.5 h for Observational Teamwork Assessment for Surgery. Estimated costs to train one rater to use all instruments ranged from $442 for a simulation specialist to $6006 for a general surgeon. Additional training is needed to achieve higher levels of agreement; however, costs may be prohibitive. The most cost-effective model for real-time OR teamwork assessment may be to use a simulation technician combined with one clinical rater to allow complete documentation of all participants. Copyright © 2014 Elsevier Inc. All rights reserved.

  3. Cost and schedule analytical techniques development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

  4. Cost Models for MMC Manufacturing Processes

    NASA Technical Reports Server (NTRS)

    Elzey, Dana M.; Wadley, Haydn N. G.

    1996-01-01

    Processes for the manufacture of advanced metal matrix composites are rapidly approaching maturity in the research laboratory and there is growing interest in their transition to industrial production. However, research conducted to date has almost exclusively focused on overcoming the technical barriers to producing high-quality material and little attention has been given to the economical feasibility of these laboratory approaches and process cost issues. A quantitative cost modeling (QCM) approach was developed to address these issues. QCM are cost analysis tools based on predictive process models relating process conditions to the attributes of the final product. An important attribute, of the QCM approach is the ability to predict the sensitivity of material production costs to product quality and to quantitatively explore trade-offs between cost and quality. Applications of the cost models allow more efficient direction of future MMC process technology development and a more accurate assessment of MMC market potential. Cost models were developed for two state-of-the art metal matrix composite (MMC) manufacturing processes: tape casting and plasma spray deposition. Quality and Cost models are presented for both processes and the resulting predicted quality-cost curves are presented and discussed.

  5. Predictive Software Cost Model Study. Volume I. Final Technical Report.

    DTIC Science & Technology

    1980-06-01

    development phase to identify computer resources necessary to support computer programs after transfer of program manangement responsibility and system... classical model development with refinements specifically applicable to avionics systems. The refinements are the result of the Phase I literature search

  6. Highway Project Delivery Requirements

    DOT National Transportation Integrated Search

    1998-07-01

    The purpose of the Commercial Vehicle Information Systems and Networks Model Deployment Initiative (CVISN MDI) is to demonstrate the technical and institutional feasibility, costs, and benefits of the primary Intelligent Transportation Systems (ITS) ...

  7. The efficiency and budgeting of public hospitals: case study of iran.

    PubMed

    Yusefzadeh, Hasan; Ghaderi, Hossein; Bagherzade, Rafat; Barouni, Mohsen

    2013-05-01

    Hospitals are the most costly and important components of any health care system, so it is important to know their economic values, pay attention to their efficiency and consider factors affecting them. The aim of this study was to assess the technical scale and economic efficiency of hospitals in the West Azerbaijan province of Iran, for which Data Envelopment Analysis (DEA) was used to propose a model for operational budgeting. This study was a descriptive-analysis that was conducted in 2009 and had three inputs and two outputs. Deap2, 1 software was used for data analysis. Slack and radial movements and surplus of inputs were calculated for selected hospitals. Finally, a model was proposed for performance-based budgeting of hospitals and health sectors using the DEA technique. The average scores of technical efficiency, pure technical efficiency (managerial efficiency) and scale efficiency of hospitals were 0.584, 0.782 and 0.771, respectively. In other words the capacity of efficiency promotion in hospitals without any increase in costs and with the same amount of inputs was about 41.5%. Only four hospitals among all hospitals had the maximum level of technical efficiency. Moreover, surplus production factors were evident in these hospitals. Reduction of surplus production factors through comprehensive planning based on the results of the Data Envelopment Analysis can play a major role in cost reduction of hospitals and health sectors. In hospitals with a technical efficiency score of less than one, the original and projected values of inputs were different; resulting in a surplus. Hence, these hospitals should reduce their values of inputs to achieve maximum efficiency and optimal performance. The results of this method was applied to hospitals a benchmark for making decisions about resource allocation; linking budgets to performance results; and controlling and improving hospitals performance.

  8. Using 3D printed models for planning and guidance during endovascular intervention: a technical advance.

    PubMed

    Itagaki, Michael W

    2015-01-01

    Three-dimensional (3D) printing applications in medicine have been limited due to high cost and technical difficulty of creating 3D printed objects. It is not known whether patient-specific, hollow, small-caliber vascular models can be manufactured with 3D printing, and used for small vessel endoluminal testing of devices. Manufacture of anatomically accurate, patient-specific, small-caliber arterial models was attempted using data from a patient's CT scan, free open-source software, and low-cost Internet 3D printing services. Prior to endovascular treatment of a patient with multiple splenic artery aneurysms, a 3D printed model was used preoperatively to test catheter equipment and practice the procedure. A second model was used intraoperatively as a reference. Full-scale plastic models were successfully produced. Testing determined the optimal puncture site for catheter positioning. A guide catheter, base catheter, and microcatheter combination selected during testing was used intraoperatively with success, and the need for repeat angiograms to optimize image orientation was minimized. A difficult and unconventional procedure was successful in treating the aneurysms while preserving splenic function. We conclude that creation of small-caliber vascular models with 3D printing is possible. Free software and low-cost printing services make creation of these models affordable and practical. Models are useful in preoperative planning and intraoperative guidance.

  9. Wind Fins: Novel Lower-Cost Wind Power System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Morris; Dr. Will D. Swearingen

    This project evaluated the technical feasibility of converting energy from the wind with a novel “wind fin” approach. This patent-pending technology has three major components: (1) a mast, (2) a vertical, hinged wind structure or fin, and (3) a power takeoff system. The wing structure responds to the wind with an oscillating motion, generating power. The overall project goal was to determine the basic technical feasibility of the wind fin technology. Specific objectives were the following: (1) to determine the wind energy-conversion performance of the wind fin and the degree to which its performance could be enhanced through basic designmore » improvements; (2) to determine how best to design the wind fin system to survive extreme winds; (3) to determine the cost-effectiveness of the best wind fin designs compared to state-of-the-art wind turbines; and (4) to develop conclusions about the overall technical feasibility of the wind fin system. Project work involved extensive computer modeling, wind-tunnel testing with small models, and testing of bench-scale models in a wind tunnel and outdoors in the wind. This project determined that the wind fin approach is technically feasible and likely to be commercially viable. Project results suggest that this new technology has the potential to harvest wind energy at approximately half the system cost of wind turbines in the 10kW range. Overall, the project demonstrated that the wind fin technology has the potential to increase the economic viability of small wind-power generation. In addition, it has the potential to eliminate lethality to birds and bats, overcome public objections to the aesthetics of wind-power machines, and significantly expand wind-power’s contribution to the national energy supply.« less

  10. Cost and technical efficiency of physician practices: a stochastic frontier approach using panel data.

    PubMed

    Heimeshoff, Mareike; Schreyögg, Jonas; Kwietniewski, Lukas

    2014-06-01

    This is the first study to use stochastic frontier analysis to estimate both the technical and cost efficiency of physician practices. The analysis is based on panel data from 3,126 physician practices for the years 2006 through 2008. We specified the technical and cost frontiers as translog function, using the one-step approach of Battese and Coelli to detect factors that influence the efficiency of general practitioners and specialists. Variables that were not analyzed previously in this context (e.g., the degree of practice specialization) and a range of control variables such as a patients' case-mix were included in the estimation. Our results suggest that it is important to investigate both technical and cost efficiency, as results may depend on the type of efficiency analyzed. For example, the technical efficiency of group practices was significantly higher than that of solo practices, whereas the results for cost efficiency differed. This may be due to indivisibilities in expensive technical equipment, which can lead to different types of health care services being provided by different practice types (i.e., with group practices using more expensive inputs, leading to higher costs per case despite these practices being technically more efficient). Other practice characteristics such as participation in disease management programs show the same impact throughout both cost and technical efficiency: participation in disease management programs led to an increase in both, technical and cost efficiency, and may also have had positive effects on the quality of care. Future studies should take quality-related issues into account.

  11. Cost Risk Analysis Based on Perception of the Engineering Process

    NASA Technical Reports Server (NTRS)

    Dean, Edwin B.; Wood, Darrell A.; Moore, Arlene A.; Bogart, Edward H.

    1986-01-01

    In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

  12. Advanced Technology Composite Fuselage: Program Overview

    NASA Technical Reports Server (NTRS)

    Ilcewicz, L. B.; Smith, P. J.; Hanson, C. T.; Walker, T. H.; Metschan, S. L.; Mabson, G. E.; Wilden, K. S.; Flynn, B. W.; Scholz, D. B.; Polland, D. R.; hide

    1997-01-01

    The Advanced Technology Composite Aircraft Structures (ATCAS) program has studied transport fuselage structure with a large potential reduction in the total direct operating costs for wide-body commercial transports. The baseline fuselage section was divided into four 'quadrants', crown, keel, and sides, gaining the manufacturing cost advantage possible with larger panels. Key processes found to have savings potential include (1) skins laminated by automatic fiber placement, (2) braided frames using resin transfer molding, and (3) panel bond technology that minimized mechanical fastening. The cost and weight of the baseline fuselage barrel was updated to complete Phase B of the program. An assessment of the former, which included labor, material, and tooling costs, was performed with the help of design cost models. Crown, keel, and side quadrant cost distributions illustrate the importance of panel design configuration, area, and other structural details. Composite sandwich panel designs were found to have the greatest cost savings potential for most quadrants. Key technical findings are summarized as an introduction to the other contractor reports documenting Phase A and B work completed in functional areas. The current program status in resolving critical technical issues is also highlighted.

  13. Designers' unified cost model

    NASA Technical Reports Server (NTRS)

    Freeman, W.; Ilcewicz, L.; Swanson, G.; Gutowski, T.

    1992-01-01

    The Structures Technology Program Office (STPO) at NASA LaRC has initiated development of a conceptual and preliminary designers' cost prediction model. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state-of-the-art preliminary design tools and computer aided design programs is being evaluated. The goal of this task is to establish theoretical cost functions that relate geometric design features to summed material cost and labor content in terms of process mechanics and physics. The output of the designers' present analytical tools will be input for the designers' cost prediction model to provide the designer with a database and deterministic cost methodology that allows one to trade and synthesize designs with both cost and weight as objective functions for optimization. This paper presents the team members, approach, goals, plans, and progress to date for development of COSTADE (Cost Optimization Software for Transport Aircraft Design Evaluation).

  14. Cost & efficiency evaluation of a publicly financed & publicly delivered referral transport service model in three districts of Haryana State, India.

    PubMed

    Prinja, Shankar; Manchanda, Neha; Aggarwal, Arun Kumar; Kaur, Manmeet; Jeet, Gursimer; Kumar, Rajesh

    2013-12-01

    Various models of referral transport services have been introduced in different States in India with an aim to reduce maternal and infant mortality. Most of the research on referral transport has focussed on coverage, quality and timeliness of the service with not much information on cost and efficiency. This study was undertaken to analyze the cost of a publicly financed and managed referral transport service model in three districts of Haryana State, and to assess its cost and technical efficiency. Data on all resources spent for delivering referral transport service, during 2010, were collected from three districts of Haryana State. Costs incurred at State level were apportioned using appropriate methods. Data Envelopment Analysis (DEA) technique was used to assess the technical efficiency of ambulances. To estimate the efficient scale of operation for ambulance service, the average cost was regressed on kilometres travelled for each ambulance station using a quadratic regression equation. The cost of referral transport per year varied from [symbol: see text] 5.2 million in Narnaul to [symbol: see text] 9.8 million in Ambala. Salaries (36-50%) constituted the major cost. Referral transport was found to be operating at an average efficiency level of 76.8 per cent. Operating an ambulance with a patient load of 137 per month was found to reduce unit costs from an average [symbol: see text] 15.5 per km to [symbol: see text] 9.57 per km. Our results showed that the publicly delivered referral transport services in Haryana were operating at an efficient level. Increasing the demand for referral transport services among the target population represents an opportunity for further improving the efficiency of the underutilized ambulances.

  15. Cost & efficiency evaluation of a publicly financed & publicly delivered referral transport service model in three districts of Haryana State, India

    PubMed Central

    Prinja, Shankar; Manchanda, Neha; Aggarwal, Arun Kumar; Kaur, Manmeet; Jeet, Gursimer; Kumar, Rajesh

    2013-01-01

    Background & objectives: Various models of referral transport services have been introduced in different States in India with an aim to reduce maternal and infant mortality. Most of the research on referral transport has focussed on coverage, quality and timeliness of the service with not much information on cost and efficiency. This study was undertaken to analyze the cost of a publicly financed and managed referral transport service model in three districts of Haryana State, and to assess its cost and technical efficiency. Methods: Data on all resources spent for delivering referral transport service, during 2010, were collected from three districts of Haryana State. Costs incurred at State level were apportioned using appropriate methods. Data Envelopment Analysis (DEA) technique was used to assess the technical efficiency of ambulances. To estimate the efficient scale of operation for ambulance service, the average cost was regressed on kilometres travelled for each ambulance station using a quadratic regression equation. Results: The cost of referral transport per year varied from ₹5.2 million in Narnaul to ₹9.8 million in Ambala. Salaries (36-50%) constituted the major cost. Referral transport was found to be operating at an average efficiency level of 76.8 per cent. Operating an ambulance with a patient load of 137 per month was found to reduce unit costs from an average ₹ 15.5 per km to ₹ 9.57 per km. Interpretation & conclusions: Our results showed that the publicly delivered referral transport services in Haryana were operating at an efficient level. Increasing the demand for referral transport services among the target population represents an opportunity for further improving the efficiency of the underutilized ambulances. PMID:24521648

  16. In search of the economic sustainability of Hadron therapy: the real cost of setting up and operating a Hadron facility.

    PubMed

    Vanderstraeten, Barbara; Verstraete, Jan; De Croock, Roger; De Neve, Wilfried; Lievens, Yolande

    2014-05-01

    To determine the treatment cost and required reimbursement for a new hadron therapy facility, considering different technical solutions and financing methods. The 3 technical solutions analyzed are a carbon only (COC), proton only (POC), and combined (CC) center, each operating 2 treatment rooms and assumed to function at full capacity. A business model defines the required reimbursement and analyzes the financial implications of setting up a facility over time; activity-based costing (ABC) calculates the treatment costs per type of patient for a center in a steady state of operation. Both models compare a private, full-cost approach with public sponsoring, only taking into account operational costs. Yearly operational costs range between €10.0M (M = million) for a publicly sponsored POC to €24.8M for a CC with private financing. Disregarding inflation, the average treatment cost calculated with ABC (COC: €29,450; POC: €46,342; CC: €46,443 for private financing; respectively €16,059, €28,296, and €23,956 for public sponsoring) is slightly lower than the required reimbursement based on the business model (between €51,200 in a privately funded POC and €18,400 in COC with public sponsoring). Reimbursement for privately financed centers is very sensitive to a delay in commissioning and to the interest rate. Higher throughput and hypofractionation have a positive impact on the treatment costs. Both calculation methods are valid and complementary. The financially most attractive option of a publicly sponsored COC should be balanced to the clinical necessities and the sociopolitical context. Copyright © 2014 Elsevier Inc. All rights reserved.

  17. Cost Estimation and Control for Flight Systems

    NASA Technical Reports Server (NTRS)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

  18. Monoscopic photogrammetry to obtain 3D models by a mobile device: a method for making facial prostheses.

    PubMed

    Salazar-Gamarra, Rodrigo; Seelaus, Rosemary; da Silva, Jorge Vicente Lopes; da Silva, Airton Moreira; Dib, Luciano Lauria

    2016-05-25

    The aim of this study is to present the development of a new technique to obtain 3D models using photogrammetry by a mobile device and free software, as a method for making digital facial impressions of patients with maxillofacial defects for the final purpose of 3D printing of facial prostheses. With the use of a mobile device, free software and a photo capture protocol, 2D captures of the anatomy of a patient with a facial defect were transformed into a 3D model. The resultant digital models were evaluated for visual and technical integrity. The technical process and resultant models were described and analyzed for technical and clinical usability. Generating 3D models to make digital face impressions was possible by the use of photogrammetry with photos taken by a mobile device. The facial anatomy of the patient was reproduced by a *.3dp and a *.stl file with no major irregularities. 3D printing was possible. An alternative method for capturing facial anatomy is possible using a mobile device for the purpose of obtaining and designing 3D models for facial rehabilitation. Further studies must be realized to compare 3D modeling among different techniques and systems. Free software and low cost equipment could be a feasible solution to obtain 3D models for making digital face impressions for maxillofacial prostheses, improving access for clinical centers that do not have high cost technology considered as a prior acquisition.

  19. Data-driven planning of distributed energy resources amidst socio-technical complexities

    NASA Astrophysics Data System (ADS)

    Jain, Rishee K.; Qin, Junjie; Rajagopal, Ram

    2017-08-01

    New distributed energy resources (DER) are rapidly replacing centralized power generation due to their environmental, economic and resiliency benefits. Previous analyses of DER systems have been limited in their ability to account for socio-technical complexities, such as intermittent supply, heterogeneous demand and balance-of-system cost dynamics. Here we develop ReMatch, an interdisciplinary modelling framework, spanning engineering, consumer behaviour and data science, and apply it to 10,000 consumers in California, USA. Our results show that deploying DER would yield nearly a 50% reduction in the levelized cost of electricity (LCOE) over the status quo even after accounting for socio-technical complexities. We abstract a detailed matching of consumers to DER infrastructure from our results and discuss how this matching can facilitate the development of smart and targeted renewable energy policies, programmes and incentives. Our findings point to the large-scale economic and technical feasibility of DER and underscore the pertinent role DER can play in achieving sustainable energy goals.

  20. IDA 2004 Cost Research Symposium: Investments in, Use of, and Management of Cost Research

    DTIC Science & Technology

    2004-09-01

    Database: None Publication: Technical Report Keywords: Government, Aircraft, SD&D, Production, Integration, Data Collection, Database, CER B- 71 ... Martin Plant in Marietta , Georgia,” IDA Paper P-3590, July 2001 “Econometric Modeling of Acquisition Category I Systems at the Raytheon Plant in...NAVSEA) ............................................................ B- 71 Naval Surface Warfare Center, Dahlgren Division (NSWCDD

  1. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  2. 78 FR 70586 - Technical Support Document: Technical Update of the Social Cost of Carbon for Regulatory Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... OFFICE OF MANAGEMENT AND BUDGET Technical Support Document: Technical Update of the Social Cost of... Budget, Executive Office of the President. ACTION: Notice of availability and request for comments. SUMMARY: The Office of Management and Budget (OMB) requests comments on the Technical Support Document...

  3. An Analysis of Costs and Cenefits Associated with Initial Contracting Technical Education and Training for Unrestricted Marine Officers

    DTIC Science & Technology

    2017-03-01

    COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS by Lee A. White...WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS 5. FUNDING NUMBERS 6. AUTHOR(S) Lee A. White 7. PERFORMING...unlimited. AN ANALYSIS OF COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS

  4. A Conceptual View of the Officer Procurement Model (TOPOPS). Technical Report No. 73-73.

    ERIC Educational Resources Information Center

    Akman, Allan; Nordhauser, Fred

    This report presents the conceptual design of a computer-based linear programing model of the Air Force officer procurement system called TOPOPS. The TOPOPS model is an aggregate model which simulates officer accession and training and is directed at optimizing officer procurement in terms of either minimizing cost or maximizing accession quality…

  5. Cost of ownership for inspection equipment

    NASA Astrophysics Data System (ADS)

    Dance, Daren L.; Bryson, Phil

    1993-08-01

    Cost of Ownership (CoO) models are increasingly a part of the semiconductor equipment evaluation and selection process. These models enable semiconductor manufacturers and equipment suppliers to quantify a system in terms of dollars per wafer. Because of the complex nature of the semiconductor manufacturing process, there are several key attributes that must be considered in order to accurately reflect the true 'cost of ownership'. While most CoO work to date has been applied to production equipment, the need to understand cost of ownership for inspection and metrology equipment presents unique challenges. Critical parameters such as detection sensitivity as a function of size and type of defect are not included in current CoO models yet are, without question, major factors in the technical evaluation process and life-cycle cost. This paper illustrates the relationship between these parameters, as components of the alpha and beta risk, and cost of ownership.

  6. Pros, Cons, and Alternatives to Weight Based Cost Estimating

    NASA Technical Reports Server (NTRS)

    Joyner, Claude R.; Lauriem, Jonathan R.; Levack, Daniel H.; Zapata, Edgar

    2011-01-01

    Many cost estimating tools use weight as a major parameter in projecting the cost. This is often combined with modifying factors such as complexity, technical maturity of design, environment of operation, etc. to increase the fidelity of the estimate. For a set of conceptual designs, all meeting the same requirements, increased weight can be a major driver in increased cost. However, once a design is fixed, increased weight generally decreases cost, while decreased weight generally increases cost - and the relationship is not linear. Alternative approaches to estimating cost without using weight (except perhaps for materials costs) have been attempted to try to produce a tool usable throughout the design process - from concept studies through development. This paper will address the pros and cons of using weight based models for cost estimating, using liquid rocket engines as the example. It will then examine approaches that minimize the impct of weight based cost estimating. The Rocket Engine- Cost Model (RECM) is an attribute based model developed internally by Pratt & Whitney Rocketdyne for NASA. RECM will be presented primarily to show a successful method to use design and programmatic parameters instead of weight to estimate both design and development costs and production costs. An operations model developed by KSC, the Launch and Landing Effects Ground Operations model (LLEGO), will also be discussed.

  7. Balancing the health workforce: breaking down overall technical change into factor technical change for labour-an empirical application to the Dutch hospital industry.

    PubMed

    Blank, Jos L T; van Hulst, Bart L

    2017-02-17

    Well-trained, well-distributed and productive health workers are crucial for access to high-quality, cost-effective healthcare. Because neither a shortage nor a surplus of health workers is wanted, policymakers use workforce planning models to get information on future labour markets and adjust policies accordingly. A neglected topic of workforce planning models is productivity growth, which has an effect on future demand for labour. However, calculating productivity growth for specific types of input is not as straightforward as it seems. This study shows how to calculate factor technical change (FTC) for specific types of input. The paper first theoretically derives FTCs from technical change in a consistent manner. FTC differs from a ratio of output and input, in that it deals with the multi-input, multi-output character of the production process in the health sector. Furthermore, it takes into account substitution effects between different inputs. An application of the calculation of FTCs is given for the Dutch hospital industry for the period 2003-2011. A translog cost function is estimated and used to calculate technical change and FTC for individual inputs, especially specific labour inputs. The results show that technical change increased by 2.8% per year in Dutch hospitals during 2003-2011. FTC differs amongst the various inputs. The FTC of nursing personnel increased by 3.2% per year, implying that fewer nurses were needed to let demand meet supply on the labour market. Sensitivity analyses show consistent results for the FTC of nurses. Productivity growth, especially of individual outputs, is a neglected topic in workforce planning models. FTC is a productivity measure that is consistent with technical change and accounts for substitution effects. An application to the Dutch hospital industry shows that the FTC of nursing personnel outpaced technical change during 2003-2011. The optimal input mix changed, resulting in fewer nurses being needed to let demand meet supply on the labour market. Policymakers should consider using more detailed and specific data on the nature of technical change when forecasting the future demand for health workers.

  8. Determining the optimal model for role-substitution in NHS dental services in the United Kingdom.

    PubMed

    Brocklehurst, Paul; Birch, Stephen; McDonald, Ruth; Tickle, Martin

    2013-09-24

    Role-substitution describes a model of dental care where Dental Care Professionals (DCPs) provide some of the clinical activity previously undertaken by General Dental Practitioners. This has the potential to increase technical efficiency, the capacity to care and reduce costs. Technical efficiency is defined as the production of the maximum amount of output from a given amount of input so that the service operates at the production frontier i.e. optimal level of productivity. Academic research into technical efficiency is becoming increasingly utilised in health care, although no studies have investigated the efficiency of NHS dentistry or role-substitution in high-street dental practices. The aim of this study is to examine the barriers and enablers that exist for role-substitution in general dental practices in the NHS and to determine the most technically efficient model for role-substitution. A screening questionnaire will be sent to DCPs to determine the type and location of role-substitutive models employed in NHS dental practices in the United Kingdom (UK). Semi-structured interviews will then be conducted with practice owners, DCPs and patients at selected sites identified by the questionnaire. Detail will be recorded about the organisational structure of the dental team, the number of NHS hours worked and the clinical activity undertaken. The interviews will continue until saturation and will record the views and attitudes of the members of the dental team. Final numbers of interviews will be determined by saturation.The second work-stream will examine the technical efficiency of the selected practices using Data Envelopment Analysis and Stochastic Frontier Modeling. The former is a non-parametric technique and is considered to be a highly flexible approach for applied health applications. The latter is parametric and is based on frontier regression models that estimate a conventional cost function. Maximising health for a given level and mix of resources is an ethical imperative for health service planners. This study will determine the technical efficiency of role-substitution and so address one of the key recommendations of the Independent Review of NHS dentistry in England.

  9. Determining the optimal model for role-substitution in NHS dental services in the United Kingdom

    PubMed Central

    2013-01-01

    Background Role-substitution describes a model of dental care where Dental Care Professionals (DCPs) provide some of the clinical activity previously undertaken by General Dental Practitioners. This has the potential to increase technical efficiency, the capacity to care and reduce costs. Technical efficiency is defined as the production of the maximum amount of output from a given amount of input so that the service operates at the production frontier i.e. optimal level of productivity. Academic research into technical efficiency is becoming increasingly utilised in health care, although no studies have investigated the efficiency of NHS dentistry or role-substitution in high-street dental practices. The aim of this study is to examine the barriers and enablers that exist for role-substitution in general dental practices in the NHS and to determine the most technically efficient model for role-substitution. Methods/design A screening questionnaire will be sent to DCPs to determine the type and location of role-substitutive models employed in NHS dental practices in the United Kingdom (UK). Semi-structured interviews will then be conducted with practice owners, DCPs and patients at selected sites identified by the questionnaire. Detail will be recorded about the organisational structure of the dental team, the number of NHS hours worked and the clinical activity undertaken. The interviews will continue until saturation and will record the views and attitudes of the members of the dental team. Final numbers of interviews will be determined by saturation. The second work-stream will examine the technical efficiency of the selected practices using Data Envelopment Analysis and Stochastic Frontier Modeling. The former is a non-parametric technique and is considered to be a highly flexible approach for applied health applications. The latter is parametric and is based on frontier regression models that estimate a conventional cost function. Discussion Maximising health for a given level and mix of resources is an ethical imperative for health service planners. This study will determine the technical efficiency of role-substitution and so address one of the key recommendations of the Independent Review of NHS dentistry in England. PMID:24063247

  10. A Model for Joint Software Reviews

    DTIC Science & Technology

    1998-10-01

    CEPMAN 1, 1996; Gabb, 1997], and with the growing popularity of outsourcing, they are becoming more important in the commercial sector [ ISO /IEC 12207 ...technical and management reviews [MIL-STD-498, 1996; ISO /IEC 12207 , 1995]. Management reviews occur after technical reviews, and are focused on the cost...characteristics, Standard (No. ISO /IEC 9126-1). [ ISO /IEC 12207 , 1995] Information Technology Software Life Cycle Processes, Standard (No. ISO /IEC 12207

  11. Production Functions for Water Delivery Systems: Analysis and Estimation Using Dual Cost Function and Implicit Price Specifications

    NASA Astrophysics Data System (ADS)

    Teeples, Ronald; Glyer, David

    1987-05-01

    Both policy and technical analysis of water delivery systems have been based on cost functions that are inconsistent with or are incomplete representations of the neoclassical production functions of economics. We present a full-featured production function model of water delivery which can be estimated from a multiproduct, dual cost function. The model features implicit prices for own-water inputs and is implemented as a jointly estimated system of input share equations and a translog cost function. Likelihood ratio tests are performed showing that a minimally constrained, full-featured production function is a necessary specification of the water delivery operations in our sample. This, plus the model's highly efficient and economically correct parameter estimates, confirms the usefulness of a production function approach to modeling the economic activities of water delivery systems.

  12. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...—the technical uncertainties of performance. (2) Management/cost control—the degree of management... Technical (1) (2) N/A N/A 22 Management/Cost Control (1) (2) N/A N/A 23 Performance Risk (Composite) N/A (3...(percent) Assignedvalue (percent) Weightedvalue (percent) Technical 60 5.0 3.0 Management/Cost Control 40 4...

  13. Chemeketa's Accountability Defined: A Study of the Costs and Benefits of Nine Vocational-Technical Programs.

    ERIC Educational Resources Information Center

    Moore, George R.; Woodnutt, Tom

    The purpose of this report is to present the background and findings of a study conducted at Chemeketa Community College (CCC) during 1978-79 in which survey information gathered from former students and their employers was applied to a cost-benefit model to determine the usefulness of nine vocational programs. These programs were early childhood…

  14. Cost and performance prospects for composite bipolar plates in fuel cells and redox flow batteries

    NASA Astrophysics Data System (ADS)

    Minke, Christine; Hickmann, Thorsten; dos Santos, Antonio R.; Kunz, Ulrich; Turek, Thomas

    2016-02-01

    Carbon-polymer-composite bipolar plates (BPP) are suitable for fuel cell and flow battery applications. The advantages of both components are combined in a product with high electrical conductivity and good processability in convenient polymer forming processes. In a comprehensive techno-economic analysis of materials and production processes cost factors are quantified. For the first time a technical cost model for BPP is set up with tight integration of material characterization measurements.

  15. Achieving Competence: Army-VOTEC School Partnership Pilot Studies.

    ERIC Educational Resources Information Center

    Stout, Mary W.

    To reduce Army training costs, the Training and Doctrine Command (TRADOC) investigated use of training at civilian secondary and postsecondary vocational-technical (VOTEC) institutions as an alternative to initial job training in Army service schools. Three models were used in the pilot study: the preservice training model in which…

  16. Technical Services Cost Studies in ARL Libraries. SPEC Kit 125.

    ERIC Educational Resources Information Center

    Hoerman, Heidi Lee

    Based on a survey of Association of Research Libraries (ARL) member libraries in February 1986, this kit is designed to illustrate a wide range of alternative approaches to analyzing the costs of technical services. The kit consists of the following unedited primary-source documents: (1) SPEC Technical Services Costs Survey (Three-Year Update)…

  17. How to Get Cost-Effectiveness Analysis Right? The Case of Vaccine Economics in Latin America.

    PubMed

    Glassman, Amanda; Cañón, Oscar; Silverman, Rachel

    2016-12-01

    In middle-income countries, vaccines against pneumococcal disease, rotavirus, and human papilloma virus are in general more costly, not necessarily cost saving, and less consistently cost-effective than earlier generation vaccines against measles, diphtheria, tetanus, and pertussis. Budget impact is also substantial; public spending on vaccines in countries adopting new vaccines is, on average, double the amount of countries that have not adopted. Policymakers must weigh the costs and benefits of the adoption decision carefully, given the low coverage of other kinds of cost-effective health and nonhealth interventions in these same settings and relatively flat overall public spending on health as a share of gross domestic product (GDP) over time. This paper considers lessons learned from recent vaccine cost-effectiveness analyses and subsequent adoption decisions in Latin America a, largely under the auspices of the Pro Vac Initiative. The paper illustrates how small methodological choices and seemingly minor technical limitations of cost-effectiveness models can have major implications for the studies' conclusions, potentially influencing countries' subsequent vaccine adoption decisions. We evaluate the ProVac models and technical outputs against the standards and framework set out by the International Decision Support Initiative Reference Case for economic evaluation and consider the practical effects of deviations from those standards. Lessons learned are discussed, including issues of appropriate comparators, GDP-based thresholds, and use of average versus incremental cost-effectiveness ratios as a convention are assessed. The article ends with recommendations for the future. Copyright © 2016 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  18. Second NASA Technical Interchange Meeting (TIM): Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box (TTB)

    NASA Technical Reports Server (NTRS)

    ONeil, D. A.; Mankins, J. C.; Christensen, C. B.; Gresham, E. C.

    2005-01-01

    The Advanced Technology Lifecycle Analysis System (ATLAS), a spreadsheet analysis tool suite, applies parametric equations for sizing and lifecycle cost estimation. Performance, operation, and programmatic data used by the equations come from a Technology Tool Box (TTB) database. In this second TTB Technical Interchange Meeting (TIM), technologists, system model developers, and architecture analysts discussed methods for modeling technology decisions in spreadsheet models, identified specific technology parameters, and defined detailed development requirements. This Conference Publication captures the consensus of the discussions and provides narrative explanations of the tool suite, the database, and applications of ATLAS within NASA s changing environment.

  19. Multiple Chronic Conditions and Healthcare Costs among Adults

    PubMed Central

    Sambamoorthi, Usha; Tan, Xi; Deb, Arijita

    2015-01-01

    The prevalence of multiple chronic conditions (MCC) is increasing among individuals of all ages. MCC are associated with poor health outcomes. The presence of MCC has profound healthcare utilization and cost implications for public and private insurance payers, individuals, and families. Investigators have used a variety of definitions for MCC to evaluate costs associated with MCC. The objective of this article is to examine the current literature in estimating excess costs associated with MCC among adults. The discussion highlights some of the theoretical and technical merits of various MCC definitions and models used to estimate the excess costs associated with MCC. PMID:26400220

  20. Analysis of energy-saving potential in residential buildings in Xiamen City and its policy implications for southern China

    NASA Astrophysics Data System (ADS)

    Guo, Fei

    The buildings sector is the largest energy-consuming sector in the world. Residential buildings consume about three-quarters of the final energy in the buildings sector. Promoting residential energy savings is in consequence critical for addressing many energy-use-related environmental challenges, such as climate change and air pollution. Given China's robust economic growth and fast urbanization, it is now a critical time to develop policy interventions on residential energy use in the nation. With this as a background, this dissertation explores effective policy intervention opportunities in southern China through analyzing the residential energy-saving potential, using the city of Xiamen as a case study. Four types of residential energy-saving potential are analyzed: technical potential, economic potential, maximum achievable potential (MAP), and possible achievable potential (PAP). Of these, the first two types are characterized as static theoretical evaluation, while the last two represent dynamic evaluation within a certain time horizon. The achievable potential analyses are rarely seen in existing literature. The analytical results reveal that there exists a significant technical potential for residential energy savings of about 20.9-24.9% in the city of Xiamen. Of the technical potential, about two-thirds to four-fifths are cost-effective from the government or society perspective. The cost-effectiveness is evaluated by comparing the "Levelized Cost of Conserved Energy (LCOCE)" of available advanced technical measures with the "Actual Cost" of conserved energy. The "Actual Cost" of energy is defined by adding the environmental externalities costs and hidden government subsidies over the retail prices of energy. The achievable potential analyses are particularly based on two key realistic factors: 1) the gradual ramping-up adoption process of advanced technical measures; and 2) individuals' adoption-decision making on them. For implementing the achievable potential analyses in Xiamen, a residential energy consumption (REC) projection model specifically tailored for southern China is developed. This computational model builds on the Kastovich (1982) adoption-decision theory and the general logic used in the U.S. EIA's (2003) National Energy Modeling System (NEMS). Base on this projection model, Xiamen's REC from the base year 2011 to 2020 is projected. This model can be used as a policy analysis tool to quantitatively evaluate the real-world impact of diverse policy incentives on residential energy use in southern China. The projection results show that the MAP of residential energy savings in Xiamen will be about only 8.3-8.4% in 2020 from a business-as-usual projection. Ten current appropriate and feasible policy interventions are evaluated for analyzing the PAP in Xiamen, which reveals that only about one-fourth to one-half of Xiamen's MAP will possibly be achieved in 2020. Based on the potential analysis for the Xiamen case, a discussion on promoting energy-saving incentive policies for the residential buildings in southern China is given. It suggests that more new, innovative and market-based policies need to be introduced in China in order to realize larger achievable potential for residential energy savings.

  1. Cost Effectiveness in Evaluation Technical Assistance: Different Aspects of Measuring Cost and Outcomes.

    ERIC Educational Resources Information Center

    Estes, Gary D.

    The paper focuses on the Title I Evaluation Technical Assistance Centers to illustrate issues of measuring costs and deciding on outcome criteria before promoting "cost-effective" approaches. Effects are illustrated for varying resource allocations among personnel, travel, materials, and phone costs as a function of emphasizing…

  2. Mask cost of ownership for advanced lithography

    NASA Astrophysics Data System (ADS)

    Muzio, Edward G.; Seidel, Philip K.

    2000-07-01

    As technology advances, becoming more difficult and more expensive, the cost of ownership (CoO) metric becomes increasingly important in evaluating technical strategies. The International SEMATECH CoC analysis has steadily gained visibility over the past year, as it attempts to level the playing field between technology choices, and create a fair relative comparison. In order to predict mask cots for advanced lithography, mask process flows are modeled using bets-known processing strategies, equipment cost, and yields. Using a newly revised yield mode, and updated mask manufacture flows, representative mask flows can be built. These flows are then used to calculate mask costs for advanced lithography down to the 50 nm node. It is never the goal of this type of work to provide absolute cost estimates for business planning purposes. However, the combination of a quantifiable yield model with a clearly defined set of mask processing flows and a cost model based upon them serves as an excellent starting point for cost driver analysis and process flow discussion.

  3. Integrating O/S models during conceptual design, part 1

    NASA Technical Reports Server (NTRS)

    Ebeling, Charles E.

    1994-01-01

    The University of Dayton is pleased to submit this report to the National Aeronautics and Space Administration (NASA), Langley Research Center, which integrates a set of models for determining operational capabilities and support requirements during the conceptual design of proposed space systems. This research provides for the integration of the reliability and maintainability (R&M) model, both new and existing simulation models, and existing operations and support (O&S) costing equations in arriving at a complete analysis methodology. Details concerning the R&M model and the O&S costing model may be found in previous reports accomplished under this grant (NASA Research Grant NAG1-1327). In the process of developing this comprehensive analysis approach, significant enhancements were made to the R&M model, updates to the O&S costing model were accomplished, and a new simulation model developed. This is the 1st part of a 3 part technical report.

  4. Software licensing policy for the Open Source Application Development Portal (OSADP).

    DOT National Transportation Integrated Search

    1998-07-01

    The purpose of the Commercial Vehicle Information Systems and Networks Model Deployment Initiative (CVISN MDI) is to demonstrate the technical and institutional feasibility, costs, and benefits of the primary Intelligent Transportation Systems (ITS) ...

  5. Systems Analysis of Physical Absorption of CO2 in Ionic Liquids for Pre-Combustion Carbon Capture.

    PubMed

    Zhai, Haibo; Rubin, Edward S

    2018-04-17

    This study develops an integrated technical and economic modeling framework to investigate the feasibility of ionic liquids (ILs) for precombustion carbon capture. The IL 1-hexyl-3-methylimidazolium bis(trifluoromethylsulfonyl)imide is modeled as a potential physical solvent for CO 2 capture at integrated gasification combined cycle (IGCC) power plants. The analysis reveals that the energy penalty of the IL-based capture system comes mainly from the process and product streams compression and solvent pumping, while the major capital cost components are the compressors and absorbers. On the basis of the plant-level analysis, the cost of CO 2 avoided by the IL-based capture and storage system is estimated to be $63 per tonne of CO 2 . Technical and economic comparisons between IL- and Selexol-based capture systems at the plant level show that an IL-based system could be a feasible option for CO 2 capture. Improving the CO 2 solubility of ILs can simplify the capture process configuration and lower the process energy and cost penalties to further enhance the viability of this technology.

  6. Modeling of GE Appliances: Cost Benefit Study of Smart Appliances in Wholesale Energy, Frequency Regulation, and Spinning Reserve Markets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fuller, Jason C.; Parker, Graham B.

    This report is the second in a series of three reports describing the potential of GE’s DR-enabled appliances to provide benefits to the utility grid. The first report described the modeling methodology used to represent the GE appliances in the GridLAB-D simulation environment and the estimated potential for peak demand reduction at various deployment levels. The third report will explore the technical capability of aggregated group actions to positively impact grid stability, including frequency and voltage regulation and spinning reserves, and the impacts on distribution feeder voltage regulation, including mitigation of fluctuations caused by high penetration of photovoltaic distributed generation.more » In this report, a series of analytical methods were presented to estimate the potential cost benefit of smart appliances while utilizing demand response. Previous work estimated the potential technical benefit (i.e., peak reduction) of smart appliances, while this report focuses on the monetary value of that participation. The effects on wholesale energy cost and possible additional revenue available by participating in frequency regulation and spinning reserve markets were explored.« less

  7. Cost effective use of liquid nitrogen in cryogenic wind tunnels

    NASA Technical Reports Server (NTRS)

    Mcintosh, Glen E.; Lombard, David S.; Martindale, David L.; Dunn, Robert P.

    1987-01-01

    A method of reliquefying from 12 to 19% of the nitrogen exhaust gas from a cryogenic wind tunnel has been developed. Technical feasibility and cost effectiveness of the system depends on performance of an innovative positive displacement expander which requires scale model testing to confirm design studies. The existing cryogenic system at the 0.3-m transonic cryogenic tunnel has been surveyed and extensive upgrades proposed. Upgrades are generally cost effective and may be implemented immediately since they are based on established technology.

  8. Low Cost Technical Solutions to Jump Start an Insider Threat Program

    DTIC Science & Technology

    2016-05-11

    Low Cost Technical Solutions to Jump Start an Insider Threat Program George J. Silowash Derrick L. Spooner Daniel L. Costa Michael J...Albrethsen May 2016 TECHNICAL NOTE CMU/SEI-2016-TN-004 CERT Division http://www.sei.cmu.edu Copyright 2016 Carnegie Mellon University This... technical note will explore tools that may be suitable for satisfying the basic technical needs of an insider threat program, giving organizations a

  9. Design of Training Systems. Computerization of the Educational Technology Assessment Model. Volume 1.

    ERIC Educational Resources Information Center

    Duffy, Larry B.; And Others

    The Educational Technology Assessment Model (ETAM) is a set of comprehensive procedures and variables for the analysis, synthesis, and decision making, in regard to the benefits, costs, and risks associated with introducing technical innovations in education and training. This final report summarizes the analysis, design, and development…

  10. An Approach for Economic Analysis of Intermodal Transportation

    PubMed Central

    Sahin, Bahri; Ust, Yasin; Guneri, Ali Fuat; Gulsun, Bahadir; Turan, Eda

    2014-01-01

    A different intermodal transportation model based on cost analysis considering technical, economical, and operational parameters is presented. The model consists of such intermodal modes as sea-road, sea-railway, road-railway, and multimode of sea-road-railway. A case study of cargo transportation has been carried out by using the suggested model. Then, the single road transportation mode has been compared to intermodal modes in terms of transportation costs. This comparison takes into account the external costs of intermodal transportation. The research reveals that, in the short distance transportation, single transportation modes always tend to be advantageous. As the transportation distance gets longer, intermodal transportation advantages begin to be effective on the costs. In addition, the proposed method in this study leads to determining the fleet size and capacity for transportation and the appropriate transportation mode. PMID:25152919

  11. An approach for economic analysis of intermodal transportation.

    PubMed

    Sahin, Bahri; Yilmaz, Huseyin; Ust, Yasin; Guneri, Ali Fuat; Gulsun, Bahadir; Turan, Eda

    2014-01-01

    A different intermodal transportation model based on cost analysis considering technical, economical, and operational parameters is presented. The model consists of such intermodal modes as sea-road, sea-railway, road-railway, and multimode of sea-road-railway. A case study of cargo transportation has been carried out by using the suggested model. Then, the single road transportation mode has been compared to intermodal modes in terms of transportation costs. This comparison takes into account the external costs of intermodal transportation. The research reveals that, in the short distance transportation, single transportation modes always tend to be advantageous. As the transportation distance gets longer, intermodal transportation advantages begin to be effective on the costs. In addition, the proposed method in this study leads to determining the fleet size and capacity for transportation and the appropriate transportation mode.

  12. Levelized Cost of Energy Analysis of Marine and Hydrokinetic Reference Models: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenne, D. S.; Yu, Y. H.; Neary, V.

    2015-04-24

    In 2010 the U.S. Department of Energy initiated the development of six marine energy converter reference models. The reference models are point designs of well-known marine energy converters. Each device was designed to operate in a specific marine resource, instead of a generic device that can be deployed at any location. This method allows each device to be used as a benchmark for future reference model to benchmark future devices. The six designs consist of three current energy converters and three wave energy converters. The reference model project has generated both technical and economic data sets that are available inmore » the public domain. The methodology to calculate the levelized cost of energy for the reference model project and an overall comparison of the cost of energy from these six reference-model designs are presented in this paper.« less

  13. Economic Planning for Multicounty Rural Areas: Application of a Linear Programming Model in Northwest Arkansas. Technical Bulletin No. 1653.

    ERIC Educational Resources Information Center

    Williams, Daniel G.

    Planners in multicounty rural areas can use the Rural Development, Activity Analysis Planning (RDAAP) model to try to influence the optimal growth of their areas among different general economic goals. The model implies that best industries for rural areas have: high proportion of imported inputs; low transportation costs; high value added/output…

  14. A DDC Bibliography on Cost/Benefits of Technical Information Services and Technology Transfer.

    ERIC Educational Resources Information Center

    Defense Documentation Center, Alexandria, VA.

    This bibliography is a compilation of literature existing in both the government and public sectors and concerning Cost/Benefits of Technical information Services and Technology Transfer. Not only was the cost-benefit to the user reflected, but consideration was given to the initial cost of information collections, the cost of processing the…

  15. The Efficiency and Budgeting of Public Hospitals: Case Study of Iran

    PubMed Central

    Yusefzadeh, Hasan; Ghaderi, Hossein; Bagherzade, Rafat; Barouni, Mohsen

    2013-01-01

    Background Hospitals are the most costly and important components of any health care system, so it is important to know their economic values, pay attention to their efficiency and consider factors affecting them. Objective The aim of this study was to assess the technical scale and economic efficiency of hospitals in the West Azerbaijan province of Iran, for which Data Envelopment Analysis (DEA) was used to propose a model for operational budgeting. Materials and Methods This study was a descriptive-analysis that was conducted in 2009 and had three inputs and two outputs. Deap2, 1 software was used for data analysis. Slack and radial movements and surplus of inputs were calculated for selected hospitals. Finally, a model was proposed for performance-based budgeting of hospitals and health sectors using the DEA technique. Results The average scores of technical efficiency, pure technical efficiency (managerial efficiency) and scale efficiency of hospitals were 0.584, 0.782 and 0.771, respectively. In other words the capacity of efficiency promotion in hospitals without any increase in costs and with the same amount of inputs was about 41.5%. Only four hospitals among all hospitals had the maximum level of technical efficiency. Moreover, surplus production factors were evident in these hospitals. Conclusions Reduction of surplus production factors through comprehensive planning based on the results of the Data Envelopment Analysis can play a major role in cost reduction of hospitals and health sectors. In hospitals with a technical efficiency score of less than one, the original and projected values of inputs were different; resulting in a surplus. Hence, these hospitals should reduce their values of inputs to achieve maximum efficiency and optimal performance. The results of this method was applied to hospitals a benchmark for making decisions about resource allocation; linking budgets to performance results; and controlling and improving hospitals performance. PMID:24349726

  16. PUBLIC POLICY ISSUES, REPLY LEGAL BRIEF, AND TECHNICAL AND ECONOMIC DATA, BEFORE THE FEDERAL COMMUNICATIONS COMMISSION, IN THE MATTER OF THE ESTABLISHMENT OF DOMESTIC COMMUNICATIONS SATELLITE FACILITIES BY NON-GOVERNMENTAL ENTITIES, DOCKET 16495.

    ERIC Educational Resources Information Center

    Ford Foundation, New York, NY.

    THE THREE PARTS OF THIS FORD FUNDATION SUBMISSION PROVIDE INFORMATION ON BROAD ISSUES OF ORGANIZATION AND PUBLIC POLICY AS THEY RELATE TO SATELLITE MODEL SYSTEMS BNS-3 AND BNS-4, ON LEGAL PROBLEMS OF AUTHORIZATION AND CONTROL, AND ON THE TECHNICAL CHARACTERISTICS, COSTS, AND BROADCAST SPECTRUM LIMITATIONS OF EACH SYSTEM. VOLUME I OUTLINES…

  17. Cost estimation for the active debris removal of multiple priority targets

    NASA Astrophysics Data System (ADS)

    Braun, Vitali; Wiedemann, Carsten; Schulz, Eugen

    The increasing number of space debris objects, especially in distinct low Earth orbit (LEO) altitudes between 600 and 1000 km, leads to an increase in the potential collision risk between the objects and threatens active satellites in that region. Several recent studies show that active debris removal (ADR) has to be performed in order to prevent a collisional cascading effect, also known as the Kessler syndrome. In order to stabilize the population growth in the critical LEO region, a removal of five prioritized objects per year has been recognized as a significant figure. Various proposals are addressing the technical issues for ADR missions, including the de-orbiting of objects by means of a service satellite using a chemical or an electric propulsion system. The servicer would rendezvous with a preselected target, perform a docking maneuver and then provide a de-orbit burn to transfer the target on a trajectory where it re-enters the Earth’s atmosphere within a given time frame. In this paper the technical aspects are complemented by a cost estimation model, focusing on multi target missions, which are based on a service satellite capable of de-orbiting more than one target within a single mission. The cost model for ADR includes initial development cost, production cost, launch cost and operation cost as well as the modelling of the propulsion system of the servicer. Therefore, different scenarios are defined for chemical and electric propulsion systems as applied to multi target missions, based on a literature review of concepts currently being under discussion. The costs of multi target missions are compared to a scenario where only one target is removed. Also, the results allow to determine an optimum number of objects to be removed per mission and provide numbers which can be used in future studies, e.g. those related to ADR cost and benefit analyses.

  18. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 3A. GSFLS technical analysis (appendix). Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kriger, A.

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. Amore » technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives.« less

  19. Development of Molten-Salt Heat Transfer Fluid Technology for Parabolic Trough Solar Power Plants - Public Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grogan, Dylan C. P.

    2013-08-15

    Executive Summary This Final Report for the "Development of Molten-Salt Heat Transfer Fluid (HTF) Technology for Parabolic Trough Solar Power Plants” describes the overall project accomplishments, results and conclusions. Phase 1 analyzed the feasibility, cost and performance of a parabolic trough solar power plant with a molten salt heat transfer fluid (HTF); researched and/or developed feasible component options, detailed cost estimates and workable operating procedures; and developed hourly performance models. As a result, a molten salt plant with 6 hours of storage was shown to reduce Thermal Energy Storage (TES) cost by 43.2%, solar field cost by 14.8%, and levelizedmore » cost of energy (LCOE) by 9.8% - 14.5% relative to a similar state-of-the-art baseline plant. The LCOE savings range met the project’s Go/No Go criteria of 10% LCOE reduction. Another primary focus of Phase 1 and 2 was risk mitigation. The large risk areas associated with a molten salt parabolic trough plant were addressed in both Phases, such as; HTF freeze prevention and recovery, collector components and piping connections, and complex component interactions. Phase 2 analyzed in more detail the technical and economic feasibility of a 140 MWe,gross molten-salt CSP plant with 6 hours of TES. Phase 2 accomplishments included developing technical solutions to the above mentioned risk areas, such as freeze protection/recovery, corrosion effects of applicable molten salts, collector design improvements for molten salt, and developing plant operating strategies for maximized plant performance and freeze risk mitigation. Phase 2 accomplishments also included developing and thoroughly analyzing a molten salt, Parabolic Trough power plant performance model, in order to achieve the project cost and performance targets. The plant performance model and an extensive basic Engineering, Procurement, and Construction (EPC) quote were used to calculate a real levelized cost of energy (LCOE) of 11.50¢/kWhe , which achieved the Phase 2 Go/No Go target of less than 0.12¢/kWhe. Abengoa Solar has high confidence that the primary risk areas have been addressed in the project and a commercial plant utilizing molten salt is economically and technically feasible. The strong results from the Phase 1 and 2 research, testing, and analyses, summarized in this report, led Abengoa Solar to recommend that the project proceed to Phase 3. However, a commercially viable collector interconnection was not fully validated by the end of Phase 2, combined with the uncertainty in the federal budget, forced the DOE and Abengoa Solar to close the project. Thus the resources required to construct and operate a molten salt pilot plant will be solely supplied by Abengoa Solar.« less

  20. Proposed reliability cost model

    NASA Technical Reports Server (NTRS)

    Delionback, L. M.

    1973-01-01

    The research investigations which were involved in the study include: cost analysis/allocation, reliability and product assurance, forecasting methodology, systems analysis, and model-building. This is a classic example of an interdisciplinary problem, since the model-building requirements include the need for understanding and communication between technical disciplines on one hand, and the financial/accounting skill categories on the other. The systems approach is utilized within this context to establish a clearer and more objective relationship between reliability assurance and the subcategories (or subelements) that provide, or reenforce, the reliability assurance for a system. Subcategories are further subdivided as illustrated by a tree diagram. The reliability assurance elements can be seen to be potential alternative strategies, or approaches, depending on the specific goals/objectives of the trade studies. The scope was limited to the establishment of a proposed reliability cost-model format. The model format/approach is dependent upon the use of a series of subsystem-oriented CER's and sometimes possible CTR's, in devising a suitable cost-effective policy.

  1. Technical-economic modelling of integrated water management: wastewater reuse in a French island.

    PubMed

    Xu, P; Valette, F; Brissaud, F; Fazio, A; Lazarova, V

    2001-01-01

    An integrated technical-economic model is used to address water management issues in the French island of Noirmoutier. The model simulates potable water production and supply, potable and non potable water demand and consumption, wastewater collection, treatment and disposal, water storage, transportation and reuse. A variety of water management scenarios is assessed through technical, economic and environmental evaluation. The scenarios include wastewater reclamation and reuse for agricultural and landscape irrigation as well as domestic non potable application, desalination of seawater and brackish groundwater for potable water supply. The study shows that, in Noirmoutier, wastewater reclamation and reuse for crop irrigation is the most cost-effective solution to the lack of water resources and the protection of sensitive environment. Some water management projects which are regarded as having less economic benefit in the short-term may become competitive in the future, as a result of tightened environmental policy, changed public attitudes and advanced water treatment technologies. The model provides an appropriate tool for water resources planning and management.

  2. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical....205-76 Trade, business, technical, and professional activity costs. (a) FEHBP participating plans, carriers, and underwriters shall seek the advance written approval of the contracting officer for...

  3. Development and application of Model of Resource Utilization, Costs, and Outcomes for Stroke (MORUCOS): an Australian economic model for stroke.

    PubMed

    Mihalopoulos, Catherine; Cadilhac, Dominique A; Moodie, Marjory L; Dewey, Helen M; Thrift, Amanda G; Donnan, Geoffrey A; Carter, Robert C

    2005-01-01

    To outline the development, structure, data assumptions, and application of an Australian economic model for stroke (Model of Resource Utilization, Costs, and Outcomes for Stroke [MORUCOS]). The model has a linked spreadsheet format with four modules to describe the disease burden and treatment pathways, estimate prevalence-based and incidence-based costs, and derive life expectancy and quality of life consequences. The model uses patient-level, community-based, stroke cohort data and macro-level simulations. An interventions module allows options for change to be consistently evaluated by modifying aspects of the other modules. To date, model validation has included sensitivity testing, face validity, and peer review. Further validation of technical and predictive accuracy is needed. The generic pathway model was assessed by comparison with a stroke subtypes (ischemic, hemorrhagic, or undetermined) approach and used to determine the relative cost-effectiveness of four interventions. The generic pathway model produced lower costs compared with a subtypes version (total average first-year costs/case AUD$ 15,117 versus AUD$ 17,786, respectively). Optimal evidence-based uptake of anticoagulation therapy for primary and secondary stroke prevention and intravenous thrombolytic therapy within 3 hours of stroke were more cost-effective than current practice (base year, 1997). MORUCOS is transparent and flexible in describing Australian stroke care and can effectively be used to systematically evaluate a range of different interventions. Adjusting results to account for stroke subtypes, as they influence cost estimates, could enhance the generic model.

  4. A Technical Description of the Officer Procurement Model (TOPOPS). Final Report.

    ERIC Educational Resources Information Center

    Akman, Allan; And Others

    The Total Objective Plan for the Officer Procurement System (TOPOPS) is an aggregate-level, computer-based model of the Air Force Officer procurement system developed to operate on the UNIVAC 1108 system. It is designed to simulate officer accession and training and achieve optimal solutions in terms of either cost minimization or accession…

  5. Benefits to the Simulation Training Community of a New ANSI Standard for the Exchange of Aero Simulation Models

    NASA Technical Reports Server (NTRS)

    Hildreth, Bruce L.; Jackson, E. Bruce

    2009-01-01

    The American Institute of Aeronautics Astronautics (AIAA) Modeling and Simulation Technical Committee is in final preparation of a new standard for the exchange of flight dynamics models. The standard will become an ANSI standard and is under consideration for submission to ISO for acceptance by the international community. The standard has some a spects that should provide benefits to the simulation training community. Use of the new standard by the training simulation community will reduce development, maintenance and technical refresh investment on each device. Furthermore, it will significantly lower the cost of performing model updates to improve fidelity or expand the envelope of the training device. Higher flight fidelity should result in better transfer of training, a direct benefit to the pilots under instruction. Costs of adopting the standard are minimal and should be paid back within the cost of the first use for that training device. The standard achie ves these advantages by making it easier to update the aerodynamic model. It provides a standard format for the model in a custom eXtensible Markup Language (XML) grammar, the Dynamic Aerospace Vehicle Exchange Markup Language (DAVE-ML). It employs an existing XML grammar, MathML, to describe the aerodynamic model in an input data file, eliminating the requirement for actual software compilation. The major components of the aero model become simply an input data file, and updates are simply new XML input files. It includes naming and axis system conventions to further simplify the exchange of information.

  6. Technical and Economic Assessment of the Implementation of Measures for Reducing Energy Losses in Distribution Systems

    NASA Astrophysics Data System (ADS)

    Aguila, Alexander; Wilson, Jorge

    2017-07-01

    This paper develops a methodology to assess a group of measures of electrical improvements in distribution systems, starting from the complementation of technical and economic criteria. In order to solve the problem of energy losses in distribution systems, technical and economic analysis was performed based on a mathematical model to establish a direct relationship between the energy saved by way of minimized losses and the costs of implementing the proposed measures. This paper aims at analysing the feasibility of reducing energy losses in distribution systems, by changing existing network conductors by larger crosssection conductors and distribution voltage change at higher levels. The impact of this methodology provides a highly efficient mathematical tool for analysing the feasibility of implementing improvement projects based on their costs which is a very useful tool for the distribution companies that will serve as a starting point to the analysis for this type of projects in distribution systems.

  7. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical... Organizations 2131.205-43 Trade, business, technical and professional activity costs. (a) FEGLI Program contractors shall seek the advance written approval of the contracting officer for allowability of all or part...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anastasia M. Gribik; Ronald E. Mizia; Harry Gatley

    This project addresses both the technical and economic feasibility of replacing industrial gas in lime kilns with synthesis gas from the gasification of hog fuel. The technical assessment includes a materials evaluation, processing equipment needs, and suitability of the heat content of the synthesis gas as a replacement for industrial gas. The economic assessment includes estimations for capital, construction, operating, maintenance, and management costs for the reference plant. To perform these assessments, detailed models of the gasification and lime kiln processes were developed using Aspen Plus. The material and energy balance outputs from the Aspen Plus model were used asmore » inputs to both the material and economic evaluations.« less

  9. Farm-economic analysis of reducing antimicrobial use whilst adopting improved management strategies on farrow-to-finish pig farms.

    PubMed

    Rojo-Gimeno, Cristina; Postma, Merel; Dewulf, Jeroen; Hogeveen, Henk; Lauwers, Ludwig; Wauters, Erwin

    2016-07-01

    Due to increasing public health concerns that food animals could be reservoirs for antibiotic resistant organisms, calls for reduced current antibiotic use on farms are growing. Nevertheless, it is challenging for farmers to perform this reduction without negatively affecting technical and economic performance. As an alternative, improved management practices based on biosecurity and vaccinations have been proven useful to reduce antimicrobial use without lowering productivity, but issues with insufficient experimental design possibilities have hindered economic analysis. In the present study a quasi-experimental approach was used for assessing the economic impact of reduction of antimicrobial use coupled with improved management strategies, particularly biosecurity strategies. The research was performed on farrow-to-finish pig farms in Flanders (northern region of Belgium). First, to account for technological progress and to avoid selection bias, propensity score analysis was used to compare data on technical parameters. The treatment group (n=48) participated in an intervention study whose aim was to improve management practices to reduce the need for use of antimicrobials. Before and after the change in management, data were collected on the technical parameters, biosecurity status, antimicrobial use, and vaccinations. Treated farms were matched without replacement with control farms (n=69), obtained from the Farm Accountancy Data Network, to estimate the difference in differences (DID) of the technical parameters. Second, the technical parameters' DID, together with the estimated costs of the management intervention and the price volatility of the feed, meat of the finisher pigs, and piglets served as a basis for modelling the profit of 11 virtual farrow-to-finish pig farms representative of the Flemish sector. Costs incurred by new biosecurity measures (median +€3.96/sow/year), and new vaccinations (median €0.00/sow/year) did not exceed the cost reduction achieved by lowering the use of antimicrobials (median -€7.68/sow/year). No negative effect on technical parameters was observed and mortality of the finishers was significantly reduced by -1.1%. Even after a substantial reduction of the antimicrobial treatments, the difference of the enterprise profit increased by +€2.67/finisher pig/year after implementing the interventions. This result proved to be robust after stochastic modelling of input and output price volatility. The results of this study can be used by veterinarians and other stakeholders to incentivise managers of farrow-to-finish operations to use biosecurity practices as a cost-effective way to reduce antimicrobial use. Copyright © 2016 Elsevier B.V. All rights reserved.

  10. Strategic approaches to planetary base development

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.

    1992-01-01

    The evolutionary development of a planetary expansionary outpost is considered in the light of both technical and economic issues. The outline of a partnering taxonomy is set forth which encompasses both institutional and temporal issues related to establishing shared interests and investments. The purely technical issues are discussed in terms of the program components which include nonaerospace technologies such as construction engineering. Five models are proposed in which partnership and autonomy for participants are approached in different ways including: (1) the standard customer/provider relationship; (2) a service-provider scenario; (3) the joint venture; (4) a technology joint-development model; and (5) a redundancy model for reduced costs. Based on the assumed characteristics of planetary surface systems the cooperative private/public models are championed with coordinated design by NASA to facilitate outside cooperation.

  11. Progress and future direction for the interim safe storage and disposal of Hanford high-level waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less

  12. SolSmart Launches to Support Local Governments | State, Local, and Tribal

    Science.gov Websites

    Local Governments May 04, 2016 by Erin Nobler As a member of the Solar Technical Assistance Team (STAT ) network, the National Renewable Energy Laboratory (NREL) provides direct technical assistance to state and no-cost technical assistance. Business processes or administrative costs, the so-called "soft

  13. The business value and cost-effectiveness of genomic medicine.

    PubMed

    Crawford, James M; Aspinall, Mara G

    2012-05-01

    Genomic medicine offers the promise of more effective diagnosis and treatment of human diseases. Genome sequencing early in the course of disease may enable more timely and informed intervention, with reduced healthcare costs and improved long-term outcomes. However, genomic medicine strains current models for demonstrating value, challenging efforts to achieve fair payment for services delivered, both for laboratory diagnostics and for use of molecular information in clinical management. Current models of healthcare reform stipulate that care must be delivered at equal or lower cost, with better patient and population outcomes. To achieve demonstrated value, genomic medicine must overcome many uncertainties: the clinical relevance of genomic variation; potential variation in technical performance and/or computational analysis; management of massive information sets; and must have available clinical interventions that can be informed by genomic analysis, so as to attain more favorable cost management of healthcare delivery and demonstrate improvements in cost-effectiveness.

  14. Library Services Funding Assessment

    NASA Technical Reports Server (NTRS)

    Lorig, Jonathan A.

    2004-01-01

    The Glenn Technical Library is a science and engineering library that primarily supports research activities at the Glenn Research Center, and provides selected services to researchers at all of the NASA research centers. Resources available in the library include books, journals, CD-ROMs, and access to various online sources, as well as live reference and inter-library loan services. The collection contains over 77,000 books, 800,000 research reports, and print or online access to over 1,400 journals. Currently the library operates within the Logistics and Technical Information Division, and is funded as an open-access resource within the GRC. Some of the research units at the GRC have recently requested that the library convert to a "pay-for-services" model, in which individual research units could fund only those journal subscriptions for which they have a specific need. Under this model, the library would always maintain a certain minimum level of pooled-expense services, including the ready reference and book collections, and inter-library loan services. Theoretically the "pay-for-services" model would encourage efficient financial allocation, and minimize the extent to which paid journal subscriptions go unused. However, this model also could potentially negate the benefits of group purchases for journal subscriptions and access. All of the major journal publishers offer package subscriptions that compare favorably in cost with the sum of individual subscription costs for a similar selection of titles. Furthermore, some of these subscription packages are "consortium" purchases that are funded collectively by the libraries at multiple NASA research centers; such consortia1 memberships would be difficult for the library to pay, if enough GRC research units were to withdraw their pooled contributions. cost of collectively-funded journal access with the cost of individual subscriptions. My primary task this summer is to create the cost dataset framework, and collect as much of the relevant data as possible. Hopefully this dataset will permit the research units at the GRC, and library administration as well, to make informed decisions about future library funding. Prior to the creation of the actual dataset, I established a comprehensive list of the library s print and online journal subscriptions. This list will be useful outside the context of the cost analysis project, as an addition to the library website. The cost analysis dataset s primary fields are: journal name, vendor, publisher, ISSN (International Standard Serial Number, to uniquely identify the titles), stand-alone price, and indication as to the presence of the journal in current GRC Technical Library consortium membership subscriptions. The dataset will hopefully facilitate comparisons between the stand-alone journal prices and the cost of shared journal subscriptions for groups of titles.

  15. Microsurgical Bypass Training Rat Model, Part 1: Technical Nuances of Exposure of the Aorta and Iliac Arteries.

    PubMed

    Tayebi Meybodi, Ali; Lawton, Michael T; Mokhtari, Pooneh; Yousef, Sonia; Gandhi, Sirin; Benet, Arnau

    2017-11-01

    Animal models using rodents are frequently used for practicing microvascular anastomosis-an essential technique in cerebrovascular surgery. However, safely and efficiently exposing rat's target vessels is technically difficult. Such difficulty may lead to excessive hemorrhage and shorten animal survival. This limits the ability to perform multiple anastomoses on a single animal and may increase the overall training time and costs. We report our model for microsurgical bypass training in rodents in 2 consecutive articles. In part 1, we describe the technical nuances for a safe and efficient exposure of the rat abdominal aorta and common iliac arteries (CIAs) for bypass. Over a 2-year period, 50 Sprague-Dawley rats underwent inhalant anesthesia for practicing microvascular anastomosis on the abdominal aorta and CIAs. Lessons learned regarding the technical nuances of vessel exposure were recorded. Several technical nuances were important for avoiding intraoperative bleeding and preventing animal demise while preparing an adequate length of vessels for bypass. The most relevant technical nuances include (1) generous subcutaneous dissection; (2) use of cotton swabs for the blunt dissection of the retroperitoneal fat; (3) combination of sharp and blunt dissection to isolate the aorta and iliac arteries from the accompanying veins; (4) proper control of the posterior branches of the aorta; and (5) efficient division and mobilization of the left renal pedicle. Applying the aforementioned technical nuances enables safe and efficient preparation of the rat abdominal aorta and CIAs for microvascular anastomosis. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Evaluating the relative impacts of operational and financial factors on the competitiveness of an algal biofuel production facility.

    PubMed

    Hise, Adam M; Characklis, Gregory W; Kern, Jordan; Gerlach, Robin; Viamajala, Sridhar; Gardner, Robert D; Vadlamani, Agasteswar

    2016-11-01

    Algal biofuels are becoming more economically competitive due to technological advances and government subsidies offering tax benefits and lower cost financing. These factors are linked, however, as the value of technical advances is affected by modeling assumptions regarding the growth conditions, process design, and financing of the production facility into which novel techniques are incorporated. Two such techniques, related to algal growth and dewatering, are evaluated in representative operating and financing scenarios using an integrated techno-economic model. Results suggest that these techniques can be valuable under specified conditions, but also that investment subsidies influence cost competitive facility design by incentivizing development of more capital intensive facilities (e.g., favoring hydrothermal liquefaction over transesterification-based facilities). Evaluating novel techniques under a variety of operational and financial scenarios highlights the set of site-specific conditions in which technical advances are most valuable, while also demonstrating the influence of subsidies linked to capital intensity. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Ahuachapan geothermal project: a technical and economic assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloomster, C.H.; DiPippo; Kuwada, J.T.

    Theeconomic and technical factors involved in using geothermal energy at Ahuachapan are examined. The experience at Ahuachapan is evaluated in relation to conditions prevailing in El Salvador and to conditions in the U.S. technical characteristics considered are: geological characteristics, well programs and gathering system, well productivity and geofluid characteristics, and energy conversion systems. Economic factors considered for El Salvador are: construction costs; environmental control costs; operating experience and costs; financing; taxes, subsidies, or incentives; marketing; and electrical system characteristics. (MHR)

  18. Economic Impacts of Climate Change on Winter Tourism: Challenges for Ski Area Operators

    NASA Astrophysics Data System (ADS)

    Damm, A.; Köberl, J.; Prettenthaler, F.; Töglhofer, C.

    2012-04-01

    Increasing temperatures and snow scarce winter seasons pose a big challenge for the winter tourism industry. Changing natural snow reliability influences tourism demand and ski area operators are faced with an enhanced need of technical snow production. The goal of the present research work is to analyze the economic effects of technical snow production under future climate conditions. Snowmaking as an adaptation strategy to climate change impacts on the ski tourism industry is already taken into consideration in several studies from a scientific perspective concerning snowmaking potentials under future climate conditions and the impacts on ski season length (e.g. Scott et al. 2003; Scott & McBoyle 2007; Hennessy et al. 2008; Steiger 2010). A few studies considered economic aspects of technical snowmaking (e.g. Teich et al. 2007; Gonseth 2008). However, a detailed analysis of the costs and benefits of snowmaking under future climate and snow conditions based on sophisticated climate and snow models has not been carried out yet. The present study addresses the gap of knowledge concerning the economic profitability of prospective snowmaking requirements under future climate scenarios. We carry out a detailed cost-revenue analysis of snowmaking under current and future climate conditions for a case study site in Styria (Austria) using dynamic investment models. The starting point of all economic calculations is the daily demand for artificial snow that determines the requirements for additional snowmaking investments and additional operating costs. The demand for artificial snow is delivered by the snow cover model AMUNDSEN (see Strasser et al. 2011) and is driven by four climate scenarios. Apart from future climate conditions the profitability of snowmaking depends on changes in costs and visitor numbers. The results of a ski tourism demand model analyzing daily visitor numbers and their dependencies of prevailing weather conditions enter the cost-revenue analysis of snowmaking and enable the determination of the immediate benefits in terms of additional revenues of ski ticket sales. Furthermore, we conduct an econometric analysis of how snowmaking investments changed ski ticket prices in previous years, as the positive effects of snowmaking on snow reliability could be offset in the longer term by the effects of higher prices for skiing, possibly resulting in lower demand.

  19. Managerial Cost Accounting for a Technical Information Center.

    ERIC Educational Resources Information Center

    Helmkamp, John G.

    A two-fold solution to the cost information deficiency problem is proposed. A formal managerial cost accounting system is designed expressly for the two information services of retrospective search and selective dissemination. The system was employed during a trial period to test its effectiveness in a technical information center. Once…

  20. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...

  1. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  2. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  3. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...

  4. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  5. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Trade, business, technical, and professional activity costs. 1631.205-76 Section 1631.205-76 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST...

  6. 48 CFR 31.205-43 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Trade, business, technical, and professional activity costs. 31.205-43 Section 31.205-43 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations...

  7. Advanced applications of numerical modelling techniques for clay extruder design

    NASA Astrophysics Data System (ADS)

    Kandasamy, Saravanakumar

    Ceramic materials play a vital role in our day to day life. Recent advances in research, manufacture and processing techniques and production methodologies have broadened the scope of ceramic products such as bricks, pipes and tiles, especially in the construction industry. These are mainly manufactured using an extrusion process in auger extruders. During their long history of application in the ceramic industry, most of the design developments of extruder systems have resulted from expensive laboratory-based experimental work and field-based trial and error runs. In spite of these design developments, the auger extruders continue to be energy intensive devices with high operating costs. Limited understanding of the physical process involved in the process and the cost and time requirements of lab-based experiments were found to be the major obstacles in the further development of auger extruders.An attempt has been made herein to use Computational Fluid Dynamics (CFD) and Finite Element Analysis (FEA) based numerical modelling techniques to reduce the costs and time associated with research into design improvement by experimental trials. These two techniques, although used widely in other engineering applications, have rarely been applied for auger extruder development. This had been due to a number of reasons including technical limitations of CFD tools previously available. Modern CFD and FEA software packages have much enhanced capabilities and allow the modelling of the flow of complex fluids such as clay.This research work presents a methodology in using Herschel-Bulkley's fluid flow based CFD model to simulate and assess the flow of clay-water mixture through the extruder and the die of a vacuum de-airing type clay extrusion unit used in ceramic extrusion. The extruder design and the operating parameters were varied to study their influence on the power consumption and the extrusion pressure. The model results were then validated using results from experimental trials on a scaled extruder which seemed to be in reasonable agreement with the former. The modelling methodology was then extended to full-scale industrial extruders. The technical and commercialsuitability of using light weight materials to manufacture extruder components was also investigated. The stress and deformation induced on the components, due to extrusion pressure, was analysed using FEA and suitable alternative materials were identified. A cost comparison was then made for different extruder materials. The results show potential of significant technical and commercial benefits to the ceramic industry.

  8. Global emissions of fluorinated greenhouse gases until 2050: technical mitigation potentials and costs

    NASA Astrophysics Data System (ADS)

    Purohit, Pallav; Hoglund-Isaksson, Lena

    2016-04-01

    The anthropogenic fluorinated (F-gases) greenhouse gas emissions have increased significantly in recent years and are estimated to rise further in response to increased demand for cooling services and the phase out of ozone-depleting substances (ODS) under the Montreal Protocol. F-gases (HFCs, PFCs and SF6) are potent greenhouse gases, with a global warming effect up to 22,800 times greater than carbon dioxide (CO2). This study presents estimates of current and future global emissions of F-gases, their technical mitigation potential and associated costs for the period 2005 to 2050. The analysis uses the GAINS model framework to estimate emissions, mitigation potentials and costs for all major sources of anthropogenic F-gases for 162 countries/regions, which are aggregated to produce global estimates. For each region, 18 emission source sectors with mitigation potentials and costs were identified. Global F-gas emissions are estimated at 0.7 Gt CO2eq in 2005 with an expected increase to about 3.6 Gt CO2eq in 2050. There are extensive opportunities to reduce emissions by over 95 percent primarily through replacement with existing low GWP substances. The initial results indicate that at least half of the mitigation potential is attainable at a cost of less than 20€ per t CO2eq, while almost 90 percent reduction is attainable at less than 100€ per t CO2eq. Currently, several policy proposals have been presented to amend the Montreal Protocol to substantially curb global HFC use. We analyze the technical potentials and costs associated with the HFC mitigation required under the different proposed Montreal Protocol amendments.

  9. Technical Challenges and Opportunities of Centralizing Space Science Mission Operations (SSMO) at NASA Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Ido, Haisam; Burns, Rich

    2015-01-01

    The NASA Goddard Space Science Mission Operations project (SSMO) is performing a technical cost-benefit analysis for centralizing and consolidating operations of a diverse set of missions into a unified and integrated technical infrastructure. The presentation will focus on the notion of normalizing spacecraft operations processes, workflows, and tools. It will also show the processes of creating a standardized open architecture, creating common security models and implementations, interfaces, services, automations, notifications, alerts, logging, publish, subscribe and middleware capabilities. The presentation will also discuss how to leverage traditional capabilities, along with virtualization, cloud computing services, control groups and containers, and possibly Big Data concepts.

  10. The "basic" approach: a single-centre experience with a cost-reducing model for paediatric cardiac extracorporeal membrane oxygenation.

    PubMed

    Padalino, Massimo A; Tessari, Chiara; Guariento, Alvise; Frigo, Anna C; Vida, Vladimiro L; Marcolongo, Andrea; Zanella, Fabio; Harvey, Michael J; Thiagarajan, Ravi R; Stellin, Giovanni

    2017-04-01

    Extracorporeal membrane oxygenation (ECMO) is a lifesaving but expensive therapy in terms of financial, technical and human resources. We report our experience with a 'basic' ECMO support model, consisting of ECMO initiated and managed without the constant presence of a bedside specialist, to assess safety, clinical outcomes and financial impact on our health system. We did a retrospective single-centre study of paediatric cardiac ECMO between January 2001 and March 2014. Outcomes included postimplant complications and survival at weaning and at discharge. We used activity based costing to compare the costs of current basic ECMO with those of a 'full optional' dedicated ECMO team (hypothesis 1); ECMO with a bedside nurse and perfusionist (hypothesis 2), and ECMO with a bedside perfusionist (hypothesis 3). Basic cardiac ECMO was required for 121 patients (median age 75 days, median weight 4.4 kg). A total of 107 patients (88%) had congenital heart disease; 37 had univentricular physiology. The median duration of ECMO was 7 days (interquartile range [IQR], 4-15 days). Overall survival at weaning and at 30 days in the neonatal and paediatric age groups was 58.6% and 30.6%, respectively; these results were not significantly different from Extracorporeal Life Support Organization data. Cost analysis revealed a saving of €30 366, €22 144 and €13 837 for each patient on basic ECMO for hypotheses 1, 2 and 3, respectively. Despite reduced human, technical and economical resources, a basic ECMO model without a bedside specialist was associated with satisfactory survival and lower costs. © The Author 2017. Published by Oxford University Press on behalf of the European Association for Cardio-Thoracic Surgery. All rights reserved.

  11. Copying Machine Improvement

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Manufacturer of the Model 2210 copying machine was looking for a plastic valve bushing material that could be produced by a low-cost injection molding process to replace the unsuitable valve bushing they were using. NERAC conducted a computer search of the NASA database and was able to supply Nashua Corporation with several technical reports in their area of interest. Information aided the company's development of a urethane valve bushing which solved the problem and created a dramatic reduction in unit cost.

  12. Energy utilization: municipal waste incineration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaBeck, M.F.

    An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less

  13. Rigorous Screening Technology for Identifying Suitable CO2 Storage Sites II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George J. Koperna Jr.; Vello A. Kuuskraa; David E. Riestenberg

    2009-06-01

    This report serves as the final technical report and users manual for the 'Rigorous Screening Technology for Identifying Suitable CO2 Storage Sites II SBIR project. Advanced Resources International has developed a screening tool by which users can technically screen, assess the storage capacity and quantify the costs of CO2 storage in four types of CO2 storage reservoirs. These include CO2-enhanced oil recovery reservoirs, depleted oil and gas fields (non-enhanced oil recovery candidates), deep coal seems that are amenable to CO2-enhanced methane recovery, and saline reservoirs. The screening function assessed whether the reservoir could likely serve as a safe, long-term CO2more » storage reservoir. The storage capacity assessment uses rigorous reservoir simulation models to determine the timing, ultimate storage capacity, and potential for enhanced hydrocarbon recovery. Finally, the economic assessment function determines both the field-level and pipeline (transportation) costs for CO2 sequestration in a given reservoir. The screening tool has been peer reviewed at an Electrical Power Research Institute (EPRI) technical meeting in March 2009. A number of useful observations and recommendations emerged from the Workshop on the costs of CO2 transport and storage that could be readily incorporated into a commercial version of the Screening Tool in a Phase III SBIR.« less

  14. When do drilling alliances add value? The alliance value model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brett, J.F.; Craig, V.B.; Wadsworth, D.B.

    1996-12-31

    A recent GRI report details three previously unstudied aspects of alliances: specific measurable factors that improve alliance success, how a successful alliance should be structured, and when an alliance makes economic sense. The most innovative tool to emerge from the report, the Alliance Value Model, addresses the third aspect. The theory behind the Alliance Value Model is that the long-term viability of any drilling relationship hinges on its ability to create real value and achieve stability. Based upon the report`s findings, the most effective way to form such an alliance is through a detailed description and integration of the technicalmore » processes involved. This new type of process-driven alliance is characterized by a value chain which links together a common set of technical processes, mutually defined bottomline goals, and shared benefits. Building a process-driven alliance requires time and people and therefore has an associated cost. The real value generated by an alliance must exceed this start-up cost. The Alliance Value Model computes the net present value (NPV) of the cash flows for four different operating arrangements: (1) Business As Usual (conventional competitive bidding process), (2) Process-Driven Alliance (linking technical processes to accelerate production and reduce expenses), (3) Incentivized Process-Driven Alliance (linked technical processes with performance incentives to promote stability), and (4) No Drill Case (primarily used to gauge the market value of services). These arrangements test different degrees of process integration between an operator and its suppliers. They can also help determine if the alliance can add enough value to exceed startup costs and if the relationship will be stable. Each partner can test the impact of the relational structure on its own profitability. When an alliance is warranted, all participants can benefit from real value generated in a stable relationship.« less

  15. Cost Finding Principles and Procedures. Preliminary Field Review Edition. Technical Report 26.

    ERIC Educational Resources Information Center

    Ziemer, Gordon; And Others

    This report is part of the Larger Cost Finding Principles Project designed to develop a uniform set of standards, definitions, and alternative procedures that will use accounting and statistical data to find the full cost of resources utilized in the process of producing institutional outputs. This technical report describes preliminary procedures…

  16. 76 FR 72666 - Pipeline Safety: Expanding the Use of Excess Flow Valves in Gas Distribution Systems to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... technical feasibility and cost of the installation of such valves; (D) The public safety benefits of the... public comment regarding the technical challenges, and the potential costs and the potential benefits of... a cost-benefit perspective. DATES: Persons interested in submitting written comments on this ANPRM...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Savic, Vesna; Hector, Louis G.; Ezzat, Hesham

    This paper presents an overview of a four-year project focused on development of an integrated computational materials engineering (ICME) toolset for third generation advanced high-strength steels (3GAHSS). Following a brief look at ICME as an emerging discipline within the Materials Genome Initiative, technical tasks in the ICME project will be discussed. Specific aims of the individual tasks are multi-scale, microstructure-based material model development using state-of-the-art computational and experimental techniques, forming, toolset assembly, design optimization, integration and technical cost modeling. The integrated approach is initially illustrated using a 980 grade transformation induced plasticity (TRIP) steel, subject to a two-step quenching andmore » partitioning (Q&P) heat treatment, as an example.« less

  18. Making the Case for Reusable Booster Systems: The Operations Perspective

    NASA Technical Reports Server (NTRS)

    Zapata, Edgar

    2012-01-01

    Presentation to the Aeronautics Space Engineering Board National Research Council Reusable Booster System: Review and Assessment Committee. Addresses: the criteria and assumptions used in the formulation of current RBS plans; the methodologies used in the current cost estimates for RBS; the modeling methodology used to frame the business case for an RBS capability including: the data used in the analysis, the models' robustness if new data become available, and the impact of unclassified government data that was previously unavailable and which will be supplied by the USAF; the technical maturity of key elements critical to RBS implementation and the ability of current technology development plans to meet technical readiness milestones.

  19. Global eradication of poliomyelitis: benefit-cost analysis.

    PubMed Central

    Bart, K. J.; Foulds, J.; Patriarca, P.

    1996-01-01

    A benefit-cost analysis of the Poliomyelitis Eradication Initiative was undertaken to facilitate national and international decision-making with regard to financial support. The base case examined the net costs and benefits during the period 1986-2040; the model assumed differential costs for oral poliovirus vaccine (OPV) and vaccine delivery in industrialized and developing countries, and ignored all benefits aside from reductions in direct costs for treatment and rehabilitation. The model showed that the "break-even" point at which benefits exceeded costs was the year 2007, with a saving of US$ 13 600 million by the year 2040. Sensitivity analyses revealed only small differences in the break-even point and in the dollars saved, when compared with the base case, even with large variations in the target age group for vaccination, the proportion of case-patients seeking medical attention, and the cost of vaccine delivery. The technical feasibility of global eradication is supported by the availability of an easily administered, inexpensive vaccine (OPV), the epidemiological characteristics of poliomyelitis, and the successful experience in the Americas with elimination of wild poliovirus infection. This model demonstrates that the Poliomyelitis Eradication Initiative is economically justified. PMID:8653814

  20. Retirement Forecasting. Technical Descriptions of Cost, Decision and Income Models. Volume 2. Report to the Chairman, Subcommittee on Social Security and Income Maintenance Programs, Committee on Finance, United States Senate.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    This supplementary report identifies and provides individual descriptions and reviews of 71 retirement forecasting models. Composed of appendices, it is intended as a source of more detailed information than that included in the main volume of the report. Appendix I is an introduction. Appendix II contains individual descriptions of 32 models of…

  1. Workforce Investments: State Strategies to Preserve Higher-Cost Career Education Programs in Community and Technical Colleges

    ERIC Educational Resources Information Center

    Shulock, Nancy; Lewis, Jodi; Tan, Connie

    2013-01-01

    In today's highly-skilled economy, rewarding career pathways are available to those who acquire technical skills by enrolling in certificate and associate degree programs in a community or technical college. Such programs are often more costly to offer than liberal arts and sciences programs that prepare students to transfer to four-year…

  2. A New Approach to Managing the Army Selective Reenlistment Bonus. Technical Report 634.

    ERIC Educational Resources Information Center

    Haber, Sheldon E.; And Others

    In this study, a theoretical model of profit maximization was developed in which the Selective Reenlistment Bonus (SRB) is treated as a wage premium payable to military personnel who are more productive, more costly to recruit and train, and less likely to continue in the Army in the absence of the SRB. Empirical estimation of the model is based…

  3. Technical Development and Application of Soft Computing in Agricultural and Biological Engineering

    USDA-ARS?s Scientific Manuscript database

    Soft computing is a set of “inexact” computing techniques, which are able to model and analyze very complex problems. For these complex problems, more conventional methods have not been able to produce cost-effective, analytical, or complete solutions. Soft computing has been extensively studied and...

  4. INTEGRATED AIR POLLUTION CONTROL SYSTEM VERSION 5.0 - VOLUME 2: TECHNICAL DOCUMENTATION

    EPA Science Inventory

    The three volume report and two diskettes document the Integrated Air Pollution Control System (IAPCS), developed for the U.S. EPA to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, an eq...

  5. INTEGRATED AIR POLLUTION CONTROL SYSTEM, VERSION 4.0 - VOLUME 2: TECHNICAL DOCUMENTATION MANUAL

    EPA Science Inventory

    The Integrated Air Pollution Control System (IAPCS) was developed for the U.S. EPA's Air and Energy Engineering Research Laboratory to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, and ...

  6. Economic evaluation of a solar hot-water system--Palm Beach County, Florida

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report projects solar-energy costs and savings for residential hot-water system over 20 year period. Evaluation uses technical and economic models with inputs based on working characteristics of installed system. Primary analysis permits calculation of economic viability for four other U.S. sites.

  7. An automation of design and modelling tasks in NX Siemens environment with original software - cost module

    NASA Astrophysics Data System (ADS)

    Zbiciak, R.; Grabowik, C.; Janik, W.

    2015-11-01

    The design-constructional process is a creation activity which strives to fulfil, as well as it possible at the certain moment of time, all demands and needs formulated by a user taking into account social, technical and technological advances. Engineer knowledge and skills and their inborn abilities have the greatest influence on the final product quality and cost. They have also deciding influence on product technical and economic value. Taking into account above it seems to be advisable to make software tools that support an engineer in the process of manufacturing cost estimation. The Cost module is built with analytical procedures which are used for relative manufacturing cost estimation. As in the case of the Generator module the Cost module was written in object programming language C# in Visual Studio environment. During the research the following eight factors, that have the greatest influence on overall manufacturing cost, were distinguished and defined: (i) a gear wheel teeth type it is straight or helicoidal, (ii) a gear wheel design shape A, B with or without wheel hub, (iii) a gear tooth module, (iv) teeth number, (v) gear rim width, (vi) gear wheel material, (vii) heat treatment or thermochemical treatment, (viii) accuracy class. Knowledge of parameters (i) to (v) is indispensable for proper modelling of 3D gear wheels models in CAD system environment. These parameters are also processed in the Cost module. The last three parameters it is (vi) to (viii) are exclusively used in the Cost module. The estimation of manufacturing relative cost is based on indexes calculated for each particular parameter. Estimated in this way the manufacturing relative cost gives an overview of design parameters influence on the final gear wheel manufacturing cost. This relative manufacturing cost takes values from 0.00 to 1,00 range. The bigger index value the higher relative manufacturing cost is. Verification whether the proposed algorithm of relative manufacturing costs estimation has been designed properly was made by comparison of the achieved from the algorithm results with those obtained from industry. This verification has indicated that in most cases both group of results are similar. Taking into account above it is possible to draw a conclusion that the Cost module might play significant role in design constructional process by adding an engineer at the selection stage of alternative gear wheels design. It should be remembered that real manufacturing cost can differ significantly according to available in a factory manufacturing techniques and stock of machine tools.

  8. Space-based solar power conversion and delivery systems study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Hazelrigg, G. A., Jr.

    1976-01-01

    The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.

  9. Benefit-Cost Analysis of Integrated Paratransit Systems : Volume 6. Technical Appendices.

    DOT National Transportation Integrated Search

    1979-09-01

    This last volume, includes five technical appendices which document the methodologies used in the benefit-cost analysis. They are the following: Scenario analysis methodology; Impact estimation; Example of impact estimation; Sensitivity analysis; Agg...

  10. Measuring energy efficiency in economics: Shadow value approach

    NASA Astrophysics Data System (ADS)

    Khademvatani, Asgar

    For decades, academic scholars and policy makers have commonly applied a simple average measure, energy intensity, for studying energy efficiency. In contrast, we introduce a distinctive marginal measure called energy shadow value (SV) for modeling energy efficiency drawn on economic theory. This thesis demonstrates energy SV advantages, conceptually and empirically, over the average measure recognizing marginal technical energy efficiency and unveiling allocative energy efficiency (energy SV to energy price). Using a dual profit function, the study illustrates how treating energy as quasi-fixed factor called quasi-fixed approach offers modeling advantages and is appropriate in developing an explicit model for energy efficiency. We address fallacies and misleading results using average measure and demonstrate energy SV advantage in inter- and intra-country energy efficiency comparison. Energy efficiency dynamics and determination of efficient allocation of energy use are shown through factors impacting energy SV: capital, technology, and environmental obligations. To validate the energy SV, we applied a dual restricted cost model using KLEM dataset for the 35 US sectors stretching from 1958 to 2000 and selected a sample of the four sectors. Following the empirical results, predicted wedges between energy price and the SV growth indicate a misallocation of energy use in stone, clay and glass (SCG) and communications (Com) sectors with more evidence in the SCG compared to the Com sector, showing overshoot in energy use relative to optimal paths and cost increases from sub-optimal energy use. The results show that energy productivity is a measure of technical efficiency and is void of information on the economic efficiency of energy use. Decomposing energy SV reveals that energy, capital and technology played key roles in energy SV increases helping to consider and analyze policy implications of energy efficiency improvement. Applying the marginal measure, we also contributed to energy efficiency convergence analysis employing the delta-convergence and unconditional & conditional beta-convergence concepts, investigating economic energy efficiency differences across the four US sectors using panel data models. The results show that, in terms of technical and allocative energy efficiency, the energy-intensive sectors, SCG and textile mill products, tend to catch the energy extensive sectors, the Com and furniture & fixtures, being conditional on sector-specific characteristics. Conditional convergence results indicate that technology, capital and energy are crucial factors in determining energy efficiency differences across the US sectors, implying that environmental or energy policies, and technological changes should be industry specific across the US sectors. The main finding is that the marginal value measure conveys information on both technical and allocative energy efficiency and accounts for all costs and benefits of energy consumption including environmental and externality costs.

  11. Metal matrix composite fabrication processes for high performance aerospace structures

    NASA Astrophysics Data System (ADS)

    Ponzi, C.

    A survey is conducted of extant methods of metal matrix composite (MMC) production in order to serve as a basis for prospective MMC users' selection of a matrix/reinforcement combination, cost-effective primary fabrication methods, and secondary fabrication techniques for the achievement of desired performance levels. Attention is given to the illustrative cases of structural fittings, control-surface connecting rods, hypersonic aircraft air inlet ramps, helicopter swash plates, and turbine rotor disks. Methods for technical and cost analysis modeling useful in process optimization are noted.

  12. Cost of dengue outbreaks: literature review and country case studies

    PubMed Central

    2013-01-01

    Background Dengue disease surveillance and vector surveillance are presumed to detect dengue outbreaks at an early stage and to save – through early response activities – resources, and reduce the social and economic impact of outbreaks on individuals, health systems and economies. The aim of this study is to unveil evidence on the cost of dengue outbreaks. Methods Economic evidence on dengue outbreaks was gathered by conducting a literature review and collecting information on the costs of recent dengue outbreaks in 4 countries: Peru, Dominican Republic, Vietnam, and Indonesia. The literature review distinguished between costs of dengue illness including cost of dengue outbreaks, cost of interventions and cost-effectiveness of interventions. Results Seventeen publications on cost of dengue showed a large range of costs from 0.2 Million US$ in Venezuela to 135.2 Million US$ in Brazil. However, these figures were not standardized to make them comparable. Furthermore, dengue outbreak costs are calculated differently across the publications, and cost of dengue illness is used interchangeably with cost of dengue outbreaks. Only one paper from Australia analysed the resources saved through active dengue surveillance. Costs of vector control interventions have been reported in 4 studies, indicating that the costs of such interventions are lower than those of actual outbreaks. Nine papers focussed on the cost-effectiveness of dengue vaccines or dengue vector control; they do not provide any direct information on cost of dengue outbreaks, but their modelling methodologies could guide future research on cost-effectiveness of national surveillance systems. The country case studies – conducted in very different geographic and health system settings - unveiled rough estimates for 2011 outbreak costs of: 12 million US$ in Vietnam, 6.75 million US$ in Indonesia, 4.5 million US$ in Peru and 2.8 million US$ in Dominican Republic (all in 2012 US$). The proportions of the different cost components (vector control; surveillance; information, education and communication; direct medical and indirect costs), as percentage of total costs, differed across the respective countries. Resources used for dengue disease control and treatment were country specific. Conclusions The evidence so far collected further confirms the methodological challenges in this field: 1) to define technically dengue outbreaks (what do we measure?) and 2) to measure accurately the costs in prospective field studies (how do we measure?). Currently, consensus on the technical definition of an outbreak is sought through the International Research Consortium on Dengue Risk Assessment, Management and Surveillance (IDAMS). Best practice guidelines should be further developed, also to improve the quality and comparability of cost study findings. Modelling the costs of dengue outbreaks and validating these models through field studies should guide further research. PMID:24195519

  13. Cost of dengue outbreaks: literature review and country case studies.

    PubMed

    Stahl, Hans-Christian; Butenschoen, Vicki Marie; Tran, Hien Tinh; Gozzer, Ernesto; Skewes, Ronald; Mahendradhata, Yodi; Runge-Ranzinger, Silvia; Kroeger, Axel; Farlow, Andrew

    2013-11-06

    Dengue disease surveillance and vector surveillance are presumed to detect dengue outbreaks at an early stage and to save--through early response activities--resources, and reduce the social and economic impact of outbreaks on individuals, health systems and economies. The aim of this study is to unveil evidence on the cost of dengue outbreaks. Economic evidence on dengue outbreaks was gathered by conducting a literature review and collecting information on the costs of recent dengue outbreaks in 4 countries: Peru, Dominican Republic, Vietnam, and Indonesia. The literature review distinguished between costs of dengue illness including cost of dengue outbreaks, cost of interventions and cost-effectiveness of interventions. Seventeen publications on cost of dengue showed a large range of costs from 0.2 Million US$ in Venezuela to 135.2 Million US$ in Brazil. However, these figures were not standardized to make them comparable. Furthermore, dengue outbreak costs are calculated differently across the publications, and cost of dengue illness is used interchangeably with cost of dengue outbreaks. Only one paper from Australia analysed the resources saved through active dengue surveillance. Costs of vector control interventions have been reported in 4 studies, indicating that the costs of such interventions are lower than those of actual outbreaks. Nine papers focussed on the cost-effectiveness of dengue vaccines or dengue vector control; they do not provide any direct information on cost of dengue outbreaks, but their modelling methodologies could guide future research on cost-effectiveness of national surveillance systems.The country case studies--conducted in very different geographic and health system settings - unveiled rough estimates for 2011 outbreak costs of: 12 million US$ in Vietnam, 6.75 million US$ in Indonesia, 4.5 million US$ in Peru and 2.8 million US$ in Dominican Republic (all in 2012 US$). The proportions of the different cost components (vector control; surveillance; information, education and communication; direct medical and indirect costs), as percentage of total costs, differed across the respective countries. Resources used for dengue disease control and treatment were country specific. The evidence so far collected further confirms the methodological challenges in this field: 1) to define technically dengue outbreaks (what do we measure?) and 2) to measure accurately the costs in prospective field studies (how do we measure?). Currently, consensus on the technical definition of an outbreak is sought through the International Research Consortium on Dengue Risk Assessment, Management and Surveillance (IDAMS). Best practice guidelines should be further developed, also to improve the quality and comparability of cost study findings. Modelling the costs of dengue outbreaks and validating these models through field studies should guide further research.

  14. Technological innovations for a sustainable business model in the semiconductor industry

    NASA Astrophysics Data System (ADS)

    Levinson, Harry J.

    2014-09-01

    Increasing costs of wafer processing, particularly for lithographic processes, have made it increasingly difficult to achieve simultaneous reductions in cost-per-function and area per device. Multiple patterning techniques have made possible the fabrication of circuit layouts below the resolution limit of single optical exposures but have led to significant increases in the costs of patterning. Innovative techniques, such as self-aligned double patterning (SADP) have enabled good device performance when using less expensive patterning equipment. Other innovations have directly reduced the cost of manufacturing. A number of technical challenges must be overcome to enable a return to single-exposure patterning using short wavelength optical techniques, such as EUV patterning.

  15. Satellite Power Systems (SPS) concept definition study. Volume 2, part 2: System engineering. [cost and programmatics

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    The latest technical and programmatic developments are considered as well as expansions of the Rockwell SPS cost model covering each phase of the program through the year 2030. Comparative cost/economic analyses cover elements of the satellite, construction system, space transportation vehicles and operations, and the ground receiving station. System plans to define time phased costs and planning requirements that support major milestones through the year 2000. A special analysis is included on natural resources required to build the SPS reference configuration. An appendix contains the SPS Work Breakdown Structure and dictionary along with detail cost data sheet on each system and main element of the program. Over 200 line items address DDT&E, theoretical first unit, investment cost per satellite, and operations charges for replacement capital and normal operations and maintenance costs.

  16. Strategy and gaps for modeling, simulation, and control of hybrid systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabiti, Cristian; Garcia, Humberto E.; Hovsapian, Rob

    2015-04-01

    The purpose of this report is to establish a strategy for modeling and simulation of candidate hybrid energy systems. Modeling and simulation is necessary to design, evaluate, and optimize the system technical and economic performance. Accordingly, this report first establishes the simulation requirements to analysis candidate hybrid systems. Simulation fidelity levels are established based on the temporal scale, real and synthetic data availability or needs, solution accuracy, and output parameters needed to evaluate case-specific figures of merit. Accordingly, the associated computational and co-simulation resources needed are established; including physical models when needed, code assembly and integrated solutions platforms, mathematical solvers,more » and data processing. This report first attempts to describe the figures of merit, systems requirements, and constraints that are necessary and sufficient to characterize the grid and hybrid systems behavior and market interactions. Loss of Load Probability (LOLP) and effective cost of Effective Cost of Energy (ECE), as opposed to the standard Levelized Cost of Electricty (LCOE), are introduced as technical and economical indices for integrated energy system evaluations. Financial assessment methods are subsequently introduced for evaluation of non-traditional, hybrid energy systems. Algorithms for coupled and iterative evaluation of the technical and economic performance are subsequently discussed. This report further defines modeling objectives, computational tools, solution approaches, and real-time data collection and processing (in some cases using real test units) that will be required to model, co-simulate, and optimize; (a) an energy system components (e.g., power generation unit, chemical process, electricity management unit), (b) system domains (e.g., thermal, electrical or chemical energy generation, conversion, and transport), and (c) systems control modules. Co-simulation of complex, tightly coupled, dynamic energy systems requires multiple simulation tools, potentially developed in several programming languages and resolved on separate time scales. Whereas further investigation and development of hybrid concepts will provide a more complete understanding of the joint computational and physical modeling needs, this report highlights areas in which co-simulation capabilities are warranted. The current development status, quality assurance, availability and maintainability of simulation tools that are currently available for hybrid systems modeling is presented. Existing gaps in the modeling and simulation toolsets and development needs are subsequently discussed. This effort will feed into a broader Roadmap activity for designing, developing, and demonstrating hybrid energy systems.« less

  17. Surveillance alternatives : cost estimates and technical considerations for the en route domain

    DOT National Transportation Integrated Search

    1998-09-01

    The report present cost estimates and technical performance projections for ten aircraft surveillance architectures. The architectures are intended for use in the en route flight domain, and are comprised of various combinations of Automatic Dependen...

  18. Techno-economic and Monte Carlo probabilistic analysis of microalgae biofuel production system.

    PubMed

    Batan, Liaw Y; Graff, Gregory D; Bradley, Thomas H

    2016-11-01

    This study focuses on the characterization of the technical and economic feasibility of an enclosed photobioreactor microalgae system with annual production of 37.85 million liters (10 million gallons) of biofuel. The analysis characterizes and breaks down the capital investment and operating costs and the production cost of unit of algal diesel. The economic modelling shows total cost of production of algal raw oil and diesel of $3.46 and $3.69 per liter, respectively. Additionally, the effects of co-products' credit and their impact in the economic performance of algal-to-biofuel system are discussed. The Monte Carlo methodology is used to address price and cost projections and to simulate scenarios with probabilities of financial performance and profits of the analyzed model. Different markets for allocation of co-products have shown significant shifts for economic viability of algal biofuel system. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. Evolving technologies drive the new roles of Biomedical Engineering.

    PubMed

    Frisch, P H; St Germain, J; Lui, W

    2008-01-01

    Rapidly changing technology coupled with the financial impact of organized health care, has required hospital Biomedical Engineering organizations to augment their traditional operational and business models to increase their role in developing enhanced clinical applications utilizing new and evolving technologies. The deployment of these technology based applications has required Biomedical Engineering organizations to re-organize to optimize the manner in which they provide and manage services. Memorial Sloan-Kettering Cancer Center has implemented a strategy to explore evolving technologies integrating them into enhanced clinical applications while optimally utilizing the expertise of the traditional Biomedical Engineering component (Clinical Engineering) to provide expanded support in technology / equipment management, device repair, preventive maintenance and integration with legacy clinical systems. Specifically, Biomedical Engineering is an integral component of the Medical Physics Department which provides comprehensive and integrated support to the Center in advanced physical, technical and engineering technology. This organizational structure emphasizes the integration and collaboration between a spectrum of technical expertise for clinical support and equipment management roles. The high cost of clinical equipment purchases coupled with the increasing cost of service has driven equipment management responsibilities to include significant business and financial aspects to provide a cost effective service model. This case study details the dynamics of these expanded roles, future initiatives and benefits for Biomedical Engineering and Memorial Sloan Kettering Cancer Center.

  20. Mars Colony in situ resource utilization: An integrated architecture and economics model

    NASA Astrophysics Data System (ADS)

    Shishko, Robert; Fradet, René; Do, Sydney; Saydam, Serkan; Tapia-Cortez, Carlos; Dempster, Andrew G.; Coulton, Jeff

    2017-09-01

    This paper reports on our effort to develop an ensemble of specialized models to explore the commercial potential of mining water/ice on Mars in support of a Mars Colony. This ensemble starts with a formal systems architecting framework to describe a Mars Colony and capture its artifacts' parameters and technical attributes. The resulting database is then linked to a variety of ;downstream; analytic models. In particular, we integrated an extraction process (i.e., ;mining;) model, a simulation of the colony's environmental control and life support infrastructure known as HabNet, and a risk-based economics model. The mining model focuses on the technologies associated with in situ resource extraction, processing, storage and handling, and delivery. This model computes the production rate as a function of the systems' technical parameters and the local Mars environment. HabNet simulates the fundamental sustainability relationships associated with establishing and maintaining the colony's population. The economics model brings together market information, investment and operating costs, along with measures of market uncertainty and Monte Carlo techniques, with the objective of determining the profitability of commercial water/ice in situ mining operations. All told, over 50 market and technical parameters can be varied in order to address ;what-if; questions, including colony location.

  1. Business Case Analysis of the Towed Gilder Air Launched System (TGALS)

    NASA Technical Reports Server (NTRS)

    Webb, Darryl W.; Nguyen, McLinton B.; Seibold, Robert W.; Wong, Frank C.; Budd, Gerald D.

    2017-01-01

    The Aerospace Corporation developed an integrated Business Case Analysis (BCA) model on behalf of the NASA Armstrong Flight Research Center (AFRC). This model evaluated the potential profitability of the Towed Glider Air Launched System (TGALS) concept, under development at AFRC, identifying potential technical, programmatic, and business decisions that could improve its business viability. The model addressed system performance metrics; development, production and operation cost estimates; market size and product service positioning; pricing alternatives; and market share.

  2. A probabilistic analysis of silicon cost

    NASA Technical Reports Server (NTRS)

    Reiter, L. J.

    1983-01-01

    Silicon materials costs represent both a cost driver and an area where improvement can be made in the manufacture of photovoltaic modules. The cost from three processes for the production of low-cost silicon being developed under the U.S. Department of Energy's (DOE) National Photovoltaic Program is analyzed. The approach is based on probabilistic inputs and makes use of two models developed at the Jet Propulsion Laboratory: SIMRAND (SIMulation of Research ANd Development) and IPEG (Improved Price Estimating Guidelines). The approach, assumptions, and limitations are detailed along with a verification of the cost analyses methodology. Results, presented in the form of cumulative probability distributions for silicon cost, indicate that there is a 55% chance of reaching the DOE target of $16/kg for silicon material. This is a technically achievable cost based on expert forecasts of the results of ongoing research and development and do not imply any market prices for a given year.

  3. Assessing the costs for hybrid versus regular transit buses : [technical brief].

    DOT National Transportation Integrated Search

    2012-10-01

    This technical brief summarizes : information about the costs and benefits : that have been attributed to use of : hybrid transit buses as found in the : literature. Results from a demonstration : project that compared fuel economy : and emissions fo...

  4. Economic analysis of electronic waste recycling: modeling the cost and revenue of a materials recovery facility in California.

    PubMed

    Kang, Hai-Yong; Schoenung, Julie M

    2006-03-01

    The objectives of this study are to identify the various techniques used for treating electronic waste (e-waste) at material recovery facilities (MRFs) in the state of California and to investigate the costs and revenue drivers for these techniques. The economics of a representative e-waste MRF are evaluated by using technical cost modeling (TCM). MRFs are a critical element in the infrastructure being developed within the e-waste recycling industry. At an MRF, collected e-waste can become marketable output products including resalable systems/components and recyclable materials such as plastics, metals, and glass. TCM has two main constituents, inputs and outputs. Inputs are process-related and economic variables, which are directly specified in each model. Inputs can be divided into two parts: inputs for cost estimation and for revenue estimation. Outputs are the results of modeling and consist of costs and revenues, distributed by unit operation, cost element, and revenue source. The results of the present analysis indicate that the largest cost driver for the operation of the defined California e-waste MRF is the materials cost (37% of total cost), which includes the cost to outsource the recycling of the cathode ray tubes (CRTs) (dollar 0.33/kg); the second largest cost driver is labor cost (28% of total cost without accounting for overhead). The other cost drivers are transportation, building, and equipment costs. The most costly unit operation is cathode ray tube glass recycling, and the next are sorting, collecting, and dismantling. The largest revenue source is the fee charged to the customer; metal recovery is the second largest revenue source.

  5. A Low-Cost Simulation Model for R-Wave Synchronized Atrial Pacing in Pediatric Patients with Postoperative Junctional Ectopic Tachycardia

    PubMed Central

    Michel, Miriam; Egender, Friedemann; Heßling, Vera; Dähnert, Ingo; Gebauer, Roman

    2016-01-01

    Background Postoperative junctional ectopic tachycardia (JET) occurs frequently after pediatric cardiac surgery. R-wave synchronized atrial (AVT) pacing is used to re-establish atrioventricular synchrony. AVT pacing is complex, with technical pitfalls. We sought to establish and to test a low-cost simulation model suitable for training and analysis in AVT pacing. Methods A simulation model was developed based on a JET simulator, a simulation doll, a cardiac monitor, and a pacemaker. A computer program simulated electrocardiograms. Ten experienced pediatric cardiologists tested the model. Their performance was analyzed using a testing protocol with 10 working steps. Results Four testers found the simulation model realistic; 6 found it very realistic. Nine claimed that the trial had improved their skills. All testers considered the model useful in teaching AVT pacing. The simulation test identified 5 working steps in which major mistakes in performance test may impede safe and effective AVT pacing and thus permitted specific training. The components of the model (exclusive monitor and pacemaker) cost less than $50. Assembly and training-session expenses were trivial. Conclusions A realistic, low-cost simulation model of AVT pacing is described. The model is suitable for teaching and analyzing AVT pacing technique. PMID:26943363

  6. Quality Inspection and Analysis of Three-Dimensional Geographic Information Model Based on Oblique Photogrammetry

    NASA Astrophysics Data System (ADS)

    Dong, S.; Yan, Q.; Xu, Y.; Bai, J.

    2018-04-01

    In order to promote the construction of digital geo-spatial framework in China and accelerate the construction of informatization mapping system, three-dimensional geographic information model emerged. The three-dimensional geographic information model based on oblique photogrammetry technology has higher accuracy, shorter period and lower cost than traditional methods, and can more directly reflect the elevation, position and appearance of the features. At this stage, the technology of producing three-dimensional geographic information models based on oblique photogrammetry technology is rapidly developing. The market demand and model results have been emerged in a large amount, and the related quality inspection needs are also getting larger and larger. Through the study of relevant literature, it is found that there are a lot of researches on the basic principles and technical characteristics of this technology, and relatively few studies on quality inspection and analysis. On the basis of summarizing the basic principle and technical characteristics of oblique photogrammetry technology, this paper introduces the inspection contents and inspection methods of three-dimensional geographic information model based on oblique photogrammetry technology. Combined with the actual inspection work, this paper summarizes the quality problems of three-dimensional geographic information model based on oblique photogrammetry technology, analyzes the causes of the problems and puts forward the quality control measures. It provides technical guidance for the quality inspection of three-dimensional geographic information model data products based on oblique photogrammetry technology in China and provides technical support for the vigorous development of three-dimensional geographic information model based on oblique photogrammetry technology.

  7. The Information Bazaar; Sixth Annual National Colloquium on Information Retrieval, May 8-9, 1969, Philadelphia, Pennsylvania.

    ERIC Educational Resources Information Center

    Schultz, Louise, Ed.

    The 31 papers in this proceedings cover social as well as technical issues, mathematical models and formal logic systems, applications descriptions, program design, cost analysis, and predictions. The papers are grouped into sessions including: privacy and information technology, describing documents, information dissemination systems, public and…

  8. Space for Technical Education: How to Plan It (And How Not To).

    ERIC Educational Resources Information Center

    Vogler, Roger

    1980-01-01

    Algeria's space use model for the Institut National d'Electricite et d'Electronique is discussed. By concentrating all of its training capability in electricity and electronics in a single institution, Algeria has realized dramatic savings in the educational process and in the cost of physical plant and equipment. (MLW)

  9. Millimeter wave satellite concepts. Volume 2: Technical report

    NASA Technical Reports Server (NTRS)

    Hilsen, N. B.; Holland, L. D.; Wallace, R. W.; Kelly, D. L.; Thomas, R. R.; Vogler, F. H.

    1979-01-01

    Identification of technologies for millimeter satellite communication systems, and assessment of the relative risks of these technologies, were accomplished through subsystem modeling and link optimization for both point-to-point and broadcast applications. The results, in terms of annual cost per channel to the user from a commercial view point, are described.

  10. Low-Cost Simulation to Teach Anesthetists' Non-Technical Skills in Rwanda.

    PubMed

    Skelton, Teresa; Nshimyumuremyi, Isaac; Mukwesi, Christian; Whynot, Sara; Zolpys, Lauren; Livingston, Patricia

    2016-08-01

    Safe anesthesia care is challenging in developing countries where there are shortages of personnel, drugs, equipment, and training. Anesthetists' Non-technical Skills (ANTS)-task management, team working, situation awareness, and decision making-are difficult to practice well in this context. Cesarean delivery is the most common surgical procedure in sub-Saharan Africa. This pilot study investigates whether a low-cost simulation model, with good psychological fidelity, can be used effectively to teach ANTS during cesarean delivery in Rwanda. Study participants were anesthesia providers working in a tertiary referral hospital in Rwanda. Baseline observations were conducted for 20 anesthesia providers during cesarean delivery using the established ANTS framework. After the first observation set was complete, participants were randomly assigned to either simulation intervention or control groups. The simulation intervention group underwent ANTS training using low-cost high psychological fidelity simulation with debriefing. No training was offered to the control group. Postintervention observations were then conducted in the same manner as the baseline observations. The primary outcome was the overall ANTS score (maximum, 16). The median (range) ANTS score of the simulation group was 13.5 (11-16). The ANTS score of the control group was 8 (8-9), with a statistically significant difference (P = .002). Simulation participants showed statistically significant improvement in subcategories and in the overall ANTS score compared with ANTS score before simulation exposure. Rwandan anesthesia providers show improvement in ANTS practice during cesarean delivery after 1 teaching session using a low-cost high psychological fidelity simulation model with debriefing.

  11. The Cost-Accounting Mechanism in Higher Educational Institutions.

    ERIC Educational Resources Information Center

    Lukoshkin, A. P.; Min'ko, E. V.

    1990-01-01

    Examines the need to increase expenditures per student at Soviet technical institutes. Proposes seeking financial assistance from enterprises employing technical specialists. Outlines an experimental program in cost accounting. Suggests stipend and wage allotments and explains some of the contractual obligations involved. (CH)

  12. Methodology for conceptual remote sensing spacecraft technology: insertion analysis balancing performance, cost, and risk

    NASA Astrophysics Data System (ADS)

    Bearden, David A.; Duclos, Donald P.; Barrera, Mark J.; Mosher, Todd J.; Lao, Norman Y.

    1997-12-01

    Emerging technologies and micro-instrumentation are changing the way remote sensing spacecraft missions are developed and implemented. Government agencies responsible for procuring space systems are increasingly requesting analyses to estimate cost, performance and design impacts of advanced technology insertion for both state-of-the-art systems as well as systems to be built 5 to 10 years in the future. Numerous spacecraft technology development programs are being sponsored by Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) agencies with the goal of enhancing spacecraft performance, reducing mass, and reducing cost. However, it is often the case that technology studies, in the interest of maximizing subsystem-level performance and/or mass reduction, do not anticipate synergistic system-level effects. Furthermore, even though technical risks are often identified as one of the largest cost drivers for space systems, many cost/design processes and models ignore effects of cost risk in the interest of quick estimates. To address these issues, the Aerospace Corporation developed a concept analysis methodology and associated software tools. These tools, collectively referred to as the concept analysis and design evaluation toolkit (CADET), facilitate system architecture studies and space system conceptual designs focusing on design heritage, technology selection, and associated effects on cost, risk and performance at the system and subsystem level. CADET allows: (1) quick response to technical design and cost questions; (2) assessment of the cost and performance impacts of existing and new designs/technologies; and (3) estimation of cost uncertainties and risks. These capabilities aid mission designers in determining the configuration of remote sensing missions that meet essential requirements in a cost- effective manner. This paper discuses the development of CADET modules and their application to several remote sensing satellite mission concepts.

  13. Carbon felt and carbon fiber - A techno-economic assessment of felt electrodes for redox flow battery applications

    NASA Astrophysics Data System (ADS)

    Minke, Christine; Kunz, Ulrich; Turek, Thomas

    2017-02-01

    Carbon felt electrodes belong to the key components of redox flow batteries. The purpose of this techno-economic assessment is to uncover the production costs of PAN- and rayon-based carbon felt electrodes. Raw material costs, energy demand and the impact of processability of fiber and felt are considered. This innovative, interdisciplinary approach combines deep insights into technical, ecologic and economic aspects of carbon felt and carbon fiber production. Main results of the calculation model are mass balances, cumulative energy demands (CED) and the production costs of conventional and biogenic carbon felts supplemented by market assessments considering textile and carbon fibers.

  14. Levelized cost of energy for a Backward Bent Duct Buoy

    DOE PAGES

    Bull, Diana; Jenne, D. Scott; Smith, Christopher S.; ...

    2016-07-18

    The Reference Model Project, supported by the U.S. Department of Energy, was developed to provide publicly available technical and economic benchmarks for a variety of marine energy converters. The methodology to achieve these benchmarks is to develop public domain designs that incorporate power performance estimates, structural models, anchor and mooring designs, power conversion chain designs, and estimates of the operations and maintenance, installation, and environmental permitting required. The reference model designs are intended to be conservative, robust, and experimentally verified. The Backward Bent Duct Buoy (BBDB) presented in this paper is one of three wave energy conversion devices studied withinmore » the Reference Model Project. Furthermore, comprehensive modeling of the BBDB in a Northern California climate has enabled a full levelized cost of energy (LCOE) analysis to be completed on this device.« less

  15. Levelized cost of energy for a Backward Bent Duct Buoy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bull, Diana; Jenne, D. Scott; Smith, Christopher S.

    2016-12-01

    The Reference Model Project, supported by the U.S. Department of Energy, was developed to provide publically available technical and economic benchmarks for a variety of marine energy converters. The methodology to achieve these benchmarks is to develop public domain designs that incorporate power performance estimates, structural models, anchor and mooring designs, power conversion chain designs, and estimates of the operations and maintenance, installation, and environmental permitting required. The reference model designs are intended to be conservative, robust, and experimentally verified. The Backward Bent Duct Buoy (BBDB) presented in this paper is one of three wave energy conversion devices studied withinmore » the Reference Model Project. Comprehensive modeling of the BBDB in a Northern California climate has enabled a full levelized cost of energy (LCOE) analysis to be completed on this device.« less

  16. Value-informed space systems design and acquisition

    NASA Astrophysics Data System (ADS)

    Brathwaite, Joy

    Investments in space systems are substantial, indivisible, and irreversible, characteristics that make them high-risk, especially when coupled with an uncertain demand environment. Traditional approaches to system design and acquisition, derived from a performance- or cost-centric mindset, incorporate little information about the spacecraft in relation to its environment and its value to its stakeholders. These traditional approaches, while appropriate in stable environments, are ill-suited for the current, distinctly uncertain, and rapidly changing technical and economic conditions; as such, they have to be revisited and adapted to the present context. This thesis proposes that in uncertain environments, decision-making with respect to space system design and acquisition should be value-based, or at a minimum value-informed. This research advances the value-centric paradigm by providing the theoretical basis, foundational frameworks, and supporting analytical tools for value assessment of priced and unpriced space systems. For priced systems, stochastic models of the market environment and financial models of stakeholder preferences are developed and integrated with a spacecraft-sizing tool to assess the system's net present value. The analytical framework is applied to a case study of a communications satellite, with market, financial, and technical data obtained from the satellite operator, Intelsat. The case study investigates the implications of the value-centric versus the cost-centric design and acquisition choices. Results identify the ways in which value-optimal spacecraft design choices are contingent on both technical and market conditions, and that larger spacecraft for example, which reap economies of scale benefits, as reflected by their decreasing cost-per-transponder, are not always the best (most valuable) choices. Market conditions and technical constraints for which convergence occurs between design choices under a cost-centric and a value-centric approach are identified and discussed. In addition, an innovative approach for characterizing value uncertainty through partial moments, a technique used in finance, is adapted to an engineering context and applied to priced space systems. Partial moments disaggregate uncertainty into upside potential and downside risk, and as such, they provide the decision-maker with additional insights for value-uncertainty management in design and acquisition. For unpriced space systems, this research first posits that their value derives from, and can be assessed through, the value of information they provide. To this effect, a Bayesian framework is created to assess system value in which the system is viewed as an information provider and the stakeholder an information recipient. Information has value to stakeholders as it changes their rational beliefs enabling them to yield higher expected pay-offs. Based on this marginal increase in expected pay-offs, a new metric, Value-of-Design (VoD), is introduced to quantify the unpriced system’s value. The Bayesian framework is applied to the case of an Earth Science satellite that provides hurricane information to oil rig operators using nested Monte Carlo modeling and simulation. Probability models of stakeholders’ beliefs, and economic models of pay-offs are developed and integrated with a spacecraft payload generation tool. The case study investigates the information value generated by each payload, with results pointing to clusters of payload instruments that yielded higher information value, and minimum information thresholds below which it is difficult to justify the acquisition of the system. In addition, an analytical decision tool, probabilistic Pareto fronts, is developed in the Cost-VoD trade space to provide the decision-maker with additional insights into the coupling of a system's probable value generation and its associated cost risk.

  17. Ammunition Cost Research Study

    DTIC Science & Technology

    1976-06-01

    LIBRARY TECHNICAL REPORT Gerald W. Kalal Patrick J. Gannon COST ANALYSIS DIVISION (DRSAR-CPE) HEADQUARTERS, U.S. ARMY ARMAMENT COMMAND ROCK ISLAND... Kalal trick J. Gannon COST ANALYSIS DIVISION (DRSAR-CPE) HEADQUARTERS, U.S. ARMY ARMAMENT COMMAND ROCK ISLAND, ILLINOIS 61201 I UNCLASSIFIED...4. DESCRIPTIVE NOTES (Type ot report and Inclusive date») Technical Report 8- AU THOR(S> (flral name, middle Initial, laat name) Gerald W. Kalal

  18. Study for analysis of benefit versus cost of low thrust propulsion system

    NASA Technical Reports Server (NTRS)

    Hamlyn, K. M.; Robertson, R. I.; Rose, L. J.

    1983-01-01

    The benefits and costs associated with placing large space systems (LSS) in operational orbits were investigated, and a flexible computer model for analyzing these benefits and costs was developed. A mission model for LSS was identified that included both NASA/Commercial and DOD missions. This model included a total of 68 STS launches for the NASA/Commercial missions and 202 launches for the DOD missions. The mission catalog was of sufficient depth to define the structure type, mass and acceleration limits of each LSS. Conceptual primary propulsion stages (PPS) designs for orbital transfer were developed for three low thrust LO2/LH2 engines baselined for the study. The performance characteristics for each of these PPS was compared to the LSS mission catalog to create a mission capture. The costs involved in placing the LSS in their operational orbits were identified. The two primary costs were that of the PPS and of the STS launch. The cost of the LSS was not included as it is not a function of the PPS performance. The basic relationships and algorithms that could be used to describe the costs were established. The benefit criteria for the mission model were also defined. These included mission capture, reliability, technical risk, development time, and growth potential. Rating guidelines were established for each parameter. For flexibility, each parameter is assigned a weighting factor.

  19. Team X Report #1401: Exoplanet Coronagraph STDT Study 2013-06

    NASA Technical Reports Server (NTRS)

    Warfield, Keith

    2013-01-01

    This document is intended to stimulate discussion of the topic described. All technical and cost analyses are preliminary. This document is not a commitment to work, but is a precursor to a formal proposal if it generates sufficient mutual interest. The data contained in this document may not be modified in any way. Cost estimates described or summarized in this document were generated as part of a preliminary, first-order cost class identification as part of an early trade space study, are based on JPL-internal parametric cost modeling, assume a JPL in-house build, and do not constitute a commitment on the part of JPL or Caltech. JPL and Team X add cost reserves for development and operations. Unadjusted estimate totals and cost reserve allocations would be revised as needed in future more-detailed studies as appropriate for the specific cost-risks for a given mission concept.

  20. Department of Defense Access to Intellectual Property for Weapon Systems Sustainment

    DTIC Science & Technology

    2017-05-01

    and acquiring technical data rights …  The cost benefit analysis of including a priced contract option for the future delivery of technical data...entail in terms of cost and benefits , while one of the activities to be finalized is the contract-specific technical data elements.66...Virginia 22311-1882 May 2017 Approved for public release; distribution is unlimited. IDA Paper P-8266 Log: H 17-000030 About This Publication This

  1. ACE: A distributed system to manage large data archives

    NASA Technical Reports Server (NTRS)

    Daily, Mike I.; Allen, Frank W.

    1993-01-01

    Competitive pressures in the oil and gas industry are requiring a much tighter integration of technical data into E and P business processes. The development of new systems to accommodate this business need must comprehend the significant numbers of large, complex data objects which the industry generates. The life cycle of the data objects is a four phase progression from data acquisition, to data processing, through data interpretation, and ending finally with data archival. In order to implement a cost effect system which provides an efficient conversion from data to information and allows effective use of this information, an organization must consider the technical data management requirements in all four phases. A set of technical issues which may differ in each phase must be addressed to insure an overall successful development strategy. The technical issues include standardized data formats and media for data acquisition, data management during processing, plus networks, applications software, and GUI's for interpretation of the processed data. Mass storage hardware and software is required to provide cost effective storage and retrieval during the latter three stages as well as long term archival. Mobil Oil Corporation's Exploration and Producing Technical Center (MEPTEC) has addressed the technical and cost issues of designing, building, and implementing an Advanced Computing Environment (ACE) to support the petroleum E and P function, which is critical to the corporation's continued success. Mobile views ACE as a cost effective solution which can give Mobile a competitive edge as well as a viable technical solution.

  2. A telemedicine model for integrating point-of-care testing into a distributed health-care environment.

    PubMed

    Villalar, J L; Arredondo, M T; Meneu, T; Traver, V; Cabrera, M F; Guillen, S; Del Pozo, F

    2002-01-01

    Centralized testing demands costly laboratories, which are inefficient and may provide poor services. Recent advances make it feasible to move clinical testing nearer to patients and the requesting physicians, thus reducing the time to treatment. Internet technologies can be used to create a virtual laboratory information system in a distributed health-care environment. This allows clinical testing to be transferred to a cooperative scheme of several point-of-care testing (POCT) nodes. Two pilot virtual laboratories were established, one in Italy (AUSL Modena) and one in Greece (Athens Medical Centre). They were constructed on a three-layer model to allow both technical and clinical verification. Different POCT devices were connected. The pilot sites produced good preliminary results in relation to user acceptance, efficiency, convenience and costs. Decentralized laboratories can be expected to become cost-effective.

  3. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  4. Final Technical Progress Report: Development of Low-Cost Suspension Heliostat; December 7, 2011 - December 6, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bender, W.

    2013-01-01

    Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.

  5. Automated array assembly task, phase 1

    NASA Technical Reports Server (NTRS)

    Carbajal, B. G.

    1977-01-01

    An assessment of state-of-the-art technologies that are applicable to silicon solar cell and solar cell module fabrication is provided. The assessment consists of a technical feasibility evaluation and a cost projection for high-volume production of silicon solar cell modules. The cost projection was approached from two directions; a design-to-cost analysis assigned cost goals to each major process element in the fabrication scheme, and a cost analysis built up projected costs for alternate technologies for each process element. A technical evaluation was used in combination with the cost analysis to identify a baseline low cost process. A novel approach to metal pattern design based on minimum power loss was developed. These design equations were used as a tool in the evaluation of metallization technologies.

  6. Choice modeling: public preferences for enhancing benefits from private forests in the Adirondacks

    Treesearch

    Donald F. Dennis; Mark J. Twery

    2007-01-01

    Recognizing the importance of private land in meeting society's needs for forest-related benefits, public agencies fund programs that provide aid to private landowners to enhance public benefits derived from these lands. This may include technical help, education, tax incentives, and cost-share programs for various management activities. It is important that...

  7. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  8. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  9. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  10. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Trade, business, technical and professional activity costs. 2131.205-43 Section 2131.205-43 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT...

  11. Space Fence PDR Concept Development Phase

    NASA Astrophysics Data System (ADS)

    Haines, L.; Phu, P.

    2011-09-01

    The Space Fence, a major Air Force acquisition program, will become the dominant low-earth orbit uncued sensor in the space surveillance network (SSN). Its primary objective is to provide a 24/7 un-cued capability to find, fix, and track small objects in low earth orbit to include emerging and evolving threats, as well as the rapidly growing population of orbital debris. Composed of up to two geographically dispersed large-scale S-band phased array radars, this new system-of-systems concept will provide comprehensive Space Situational Awareness through net-centric operations and integrated decision support. Additionally, this program will facilitate cost saving force structure changes in the SSN, specifically including the decommissioning of very-high frequency VHF Air Force Space Surveillance System (AFSSS). The Space Fence Program Office entered a Preliminary Design Review (PDR) concept development phase in January 2011 to achieve the delivery of the Initial Operational Capability (IOC) expected in FY17. Two contractors were awarded to perform preliminary system design, conduct radar performance analyses and evaluations, and develop a functional PDR radar system prototype. The key objectives for the Phase A PDR effort are to reduce Space Fence total program technical, cost, schedule, and performance risk. The overall program objective is to achieve a preliminary design that demonstrates sufficient technical and manufacturing maturity and that represents a low risk, affordable approach to meet the Space Fence Technical Requirements Document (TRD) requirements for the final development and production phase to begin in 3QFY12. This paper provides an overview of the revised Space Fence program acquisition strategy for the Phase-A PDR phase to IOC, the overall program milestones and major technical efforts. In addition, the key system trade studies and modeling/simulation efforts undertaken during the System Design Requirement (SDR) phase to address and mitigate technical challenges of the Space Fence System will also be discussed. Examples include radar system optimization studies, modeling and simulation for system performance assessment, investigation of innovative Astrodynamics algorithms for initial orbit determination and observation correlation.

  12. The COST Action IC0604 "Telepathology Network in Europe" (EURO-TELEPATH).

    PubMed

    García-Rojo, Marcial; Gonçalves, Luís; Blobel, Bernd

    2012-01-01

    The COST Action IC0604 "Telepathology Network in Europe" (EURO-TELEPATH) is a European COST Action that has been running from 2007 to 2011. COST Actions are funded by the COST (European Cooperation in the field of Scientific and Technical Research) Agency, supported by the Seventh Framework Programme for Research and Technological Development (FP7), of the European Union. EURO-TELEPATH's main objectives were evaluating and validating the common technological framework and communication standards required to access, transmit and manage digital medical records by pathologists and other medical professionals in a networked environment. The project was organized in four working groups. orking Group 1 "Business modeling in pathology" has designed main pathology processes - Frozen Study, Formalin Fixed Specimen Study, Telepathology, Cytology, and Autopsy -using Business Process Modeling Notation (BPMN). orking Group 2 "Informatics standards in pathology" has been dedicated to promoting the development and application of informatics standards in pathology, collaborating with Integrating the Healthcare Enterprise (IHE), Digital Imaging and Communications in Medicine (DICOM), Health Level Seven (HL7), and other standardization bodies. Working Group 3 "Images: Analysis, Processing, Retrieval and Management" worked on the use of virtual or digital slides that are fostering the use of image processing and analysis in pathology not only for research purposes, but also in daily practice. Working Group 4 "Technology and Automation in Pathology" was focused on studying the adequacy of current existing technical solutions, including, e.g., the quality of images obtained by slide scanners, or the efficiency of image analysis applications. Major outcome of this action are the collaboration with international health informatics standardization bodies to foster the development of standards for digital pathology, offering a new approach for workflow analysis, based in business process modeling. Health terminology standardization research has become a topic of high interest. Future research work should focus on standardization of automatic image analysis and tissue microarrays imaging.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpkins, Travis; Cutler, Dylan; Hirsch, Brian

    There are thousands of isolated, diesel-powered microgrids that deliver energy to remote communities around the world at very high energy costs. The Remote Communities Renewable Energy program aims to help these communities reduce their fuel consumption and lower their energy costs through the use of high penetration renewable energy. As part of this program, the REopt modeling platform for energy system integration and optimization was used to analyze cost-optimal pathways toward achieving a combined 75% reduction in diesel fuel and fuel oil consumption in a select Alaskan village. In addition to the existing diesel generator and fuel oil heating technologies,more » the model was able to select from among wind, battery storage, and dispatchable electric heaters to meet the electrical and thermal loads. The model results indicate that while 75% fuel reduction appears to be technically feasible it may not be economically viable at this time. When the fuel reduction target was relaxed, the results indicate that by installing high-penetration renewable energy, the community could lower their energy costs by 21% while still reducing their fuel consumption by 54%.« less

  14. Probabilistic Mass Growth Uncertainties

    NASA Technical Reports Server (NTRS)

    Plumer, Eric; Elliott, Darren

    2013-01-01

    Mass has been widely used as a variable input parameter for Cost Estimating Relationships (CER) for space systems. As these space systems progress from early concept studies and drawing boards to the launch pad, their masses tend to grow substantially, hence adversely affecting a primary input to most modeling CERs. Modeling and predicting mass uncertainty, based on historical and analogous data, is therefore critical and is an integral part of modeling cost risk. This paper presents the results of a NASA on-going effort to publish mass growth datasheet for adjusting single-point Technical Baseline Estimates (TBE) of masses of space instruments as well as spacecraft, for both earth orbiting and deep space missions at various stages of a project's lifecycle. This paper will also discusses the long term strategy of NASA Headquarters in publishing similar results, using a variety of cost driving metrics, on an annual basis. This paper provides quantitative results that show decreasing mass growth uncertainties as mass estimate maturity increases. This paper's analysis is based on historical data obtained from the NASA Cost Analysis Data Requirements (CADRe) database.

  15. Comparison of Technical and Clinical Outcome of Transjugular Portosystemic Shunt Placement Between a Bare Metal Stent and a PTFE-Stentgraft Device.

    PubMed

    Lauermann, J; Potthoff, A; Mc Cavert, M; Marquardt, S; Vaske, B; Rosenthal, H; von Hahn, T; Wacker, F; Meyer, B C; Rodt, Thomas

    2016-04-01

    To analyse technical and clinical success of transjugular intrahepatic portosystemic shunt (TIPS) in patients with portal hypertension and compare a stent and a stentgraft with regard to clinical and technical outcome and associated costs. 170 patients (56 ± 12 years, 32.9% females) treated with TIPS due to portal hypertension were reviewed. 80 patients received a stent (group 1) and 83 a stentgraft (group 2), and seven interventions were unsuccessful. Technical data, periprocedural imaging, follow-up ultrasound and clinical data were analysed with focus on technical success, patency, clinical outcome and group differences. Cost analysis was performed. Portal hypertension was mainly caused by ethyltoxic liver cirrhosis with ascites as dominant symptom (80%). Technical success was 93.5% with mean portosystemic gradient decrease from 16.1 ± 4.8 to 5.1 ± 2.1 mmHg. No significant differences in technical success and portosystemic gradient decrease between the groups were observed. Kaplan-Meier analysis yielded significant differences in primary patency after 14 days, 6 months and 2 years in favour of the stentgraft. Both groups showed good clinical results without significant difference in 1-year survival and hepatic encephalopathy rate. Costs to establish TIPS and to manage 2-year follow-up with constant patency and clinical success were 8876 € (group 1) and 9394 € (group 2). TIPS is a safe and effective procedure to manage portal hypertension. Stent and stentgraft enabled good technical and clinical results with a low complication rate. Primary patency rates are clearly in favour of the stentgraft, whereas the stent was more cost effective with similar clinical results in both groups.

  16. Comparison of Technical and Clinical Outcome of Transjugular Portosystemic Shunt Placement Between a Bare Metal Stent and a PTFE-Stentgraft Device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lauermann, J., E-mail: jostlauermann@gmail.com; Potthoff, A.; Mc Cavert, M.

    PurposeTo analyse technical and clinical success of transjugular intrahepatic portosystemic shunt (TIPS) in patients with portal hypertension and compare a stent and a stentgraft with regard to clinical and technical outcome and associated costs.Materials and Methods170 patients (56 ± 12 years, 32.9 % females) treated with TIPS due to portal hypertension were reviewed. 80 patients received a stent (group 1) and 83 a stentgraft (group 2), and seven interventions were unsuccessful. Technical data, periprocedural imaging, follow-up ultrasound and clinical data were analysed with focus on technical success, patency, clinical outcome and group differences. Cost analysis was performed.ResultsPortal hypertension was mainly caused by ethyltoxicmore » liver cirrhosis with ascites as dominant symptom (80 %). Technical success was 93.5 % with mean portosystemic gradient decrease from 16.1 ± 4.8 to 5.1 ± 2.1 mmHg. No significant differences in technical success and portosystemic gradient decrease between the groups were observed. Kaplan–Meier analysis yielded significant differences in primary patency after 14 days, 6 months and 2 years in favour of the stentgraft. Both groups showed good clinical results without significant difference in 1-year survival and hepatic encephalopathy rate. Costs to establish TIPS and to manage 2-year follow-up with constant patency and clinical success were 8876 € (group 1) and 9394 € (group 2).ConclusionTIPS is a safe and effective procedure to manage portal hypertension. Stent and stentgraft enabled good technical and clinical results with a low complication rate. Primary patency rates are clearly in favour of the stentgraft, whereas the stent was more cost effective with similar clinical results in both groups.« less

  17. Technical snow production in skiing areas: conditions, practice, monitoring and modelling. A case study in Mayrhofen/Austria

    NASA Astrophysics Data System (ADS)

    Strasser, Ulrich; Hanzer, Florian; Marke, Thomas; Rothleitner, Michael

    2017-04-01

    The production of technical snow today is a self-evident feature of modern alpine skiing resort management. Millions of Euros are invested every year for the technical infrastructure and its operation to produce a homogeneous and continuing snow cover on the skiing slopes for the winter season in almost every larger destination in the Alps. In Austria, skiing tourism is a significant factor of the national economic structure. We present the framing conditions of technical snow production in the mid-size skiing resort of Mayrhofen (Zillertal Alps/Austria, 136 km slopes, elevation range 630 - 2.500 m a.s.l.). Production conditions are defined by the availability of water, the planned date for the season opening, and the climatic conditions in the weeks before. By means of an adapted snow production strategy an attempt is made to ecologically and economically optimize the use of water and energy resources. Monitoring of the snow cover is supported by a network of low-cost sensors and mobile snow depth recordings. Finally, technical snow production is simulated with the spatially distributed, physically based hydroclimatological model AMUNDSEN. The model explicitly considers individual snow guns and distributes the produced snow along the slopes. The amount of simulated snow produced by each device is a function of its type, of actual wet-bulb temperature at the location, of ski area infrastructure (in terms of water supply and pumping capacity), and of snow demand.

  18. Impact of Research and Development, Analysis, and Standardization on PV Project Financing Costs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feldman, David J; Margolis, Robert M; Jones-Albertus, Rebecca

    The technical report discusses how R and D efforts focused on removing perceived risk from cash flows to investors have the potential to lower the cost of capital and increase the amount of leverage in a solar project. It also discusses how creating business efficiencies that allow financing transactions to occur more quickly with less effort can reduce the upfront costs associated with arranging financing for a solar project or group of projects. The paper then assesses the impact that these R and D activities might have on the volatility of PV asset cash flows and asset value, as wellmore » as the upfront costs of arranging a financial transaction. Finally, we insert these assumptions into financial models to analyze their impacts on the cost of capital for equity and debt investors, project leverage, and upfront financial transaction costs.« less

  19. Mobil Solar Energy Corporation thin EFG octagons

    NASA Astrophysics Data System (ADS)

    Kalejs, J. P.

    1994-06-01

    Mobil Solar Energy Corporation manufactures photovoltaic modules based on its unique Edge-defined Film-fed Growth (EFG) process for producing octagon-shaped hollow polycrystalline silicon tubes. The octagons are cut by lasers into 100 mm x 100 mm wafers which are suitable for solar cell processing. This process avoids slicing, grinding and polishing operations which are wasteful of material and are typical of most other wafer production methods. EFG wafers are fabricated into solar cells and modules using processes that have been specially developed to allow scaling up to high throughput rates. The goals of the Photovoltaic Manufacturing Technology Initiative (PVMaT) program at Mobil Solar were to improve the EFG manufacturing line through technology advances that accelerate cost reduction in production and stimulate market growth for its product. The program was structured into three main tasks: to decrease silicon utilization by lowering wafer thickness from 400 to 200 (mu)m; to enhance laser cutting yields and throughput while improving the wafer strength; and to raise crystal growth productivity and yield. The technical problems faced and the advances made in the Mobil Solar PVMaT program are described. The author concludes with a presentation of the results of a detailed cost model for EFT module production. This model describes the accelerated reductions in manufacturing costs which are already in place and the future benefits anticipated to result from the technical achievements of the PVMaT program.

  20. Modeling and Optimization of Recycled Water Systems to Augment Urban Groundwater Recharge through Underutilized Stormwater Spreading Basins.

    PubMed

    Bradshaw, Jonathan L; Luthy, Richard G

    2017-10-17

    Infrastructure systems that use stormwater and recycled water to augment groundwater recharge through spreading basins represent cost-effective opportunities to diversify urban water supplies. However, technical questions remain about how these types of managed aquifer recharge systems should be designed; furthermore, existing planning tools are insufficient for performing robust design comparisons. Addressing this need, we present a model for identifying the best-case design and operation schedule for systems that deliver recycled water to underutilized stormwater spreading basins. Resulting systems are optimal with respect to life cycle costs and water deliveries. Through a case study of Los Angeles, California, we illustrate how delivering recycled water to spreading basins could be optimally implemented. Results illustrate trade-offs between centralized and decentralized configurations. For example, while a centralized Hyperion system could deliver more recycled water to the Hansen Spreading Grounds, this system incurs approximately twice the conveyance cost of a decentralized Tillman system (mean of 44% vs 22% of unit life cycle costs). Compared to existing methods, our model allows for more comprehensive and precise analyses of cost, water volume, and energy trade-offs among different design scenarios. This model can inform decisions about spreading basin operation policies and the development of new water supplies.

  1. A unified approach for composite cost reporting and prediction in the ACT program

    NASA Technical Reports Server (NTRS)

    Freeman, W. Tom; Vosteen, Louis F.; Siddiqi, Shahid

    1991-01-01

    The Structures Technology Program Office (STPO) at NASA Langley Research Center has held two workshops with representatives from the commercial airframe companies to establish a plan for development of a standard cost reporting format and a cost prediction tool for conceptual and preliminary designers. This paper reviews the findings of the workshop representatives with a plan for implementation of their recommendations. The recommendations of the cost tracking and reporting committee will be implemented by reinstituting the collection of composite part fabrication data in a format similar to the DoD/NASA Structural Composites Fabrication Guide. The process of data collection will be automated by taking advantage of current technology with user friendly computer interfaces and electronic data transmission. Development of a conceptual and preliminary designers' cost prediction model will be initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design (CAD) programs is assessed.

  2. A Bone Marrow Aspirate and Trephine Simulator.

    PubMed

    Yap, Eng Soo; Koh, Pei Lin; Ng, Chin Hin; de Mel, Sanjay; Chee, Yen Lin

    2015-08-01

    Bone marrow aspirate and trephine (BMAT) biopsy is a commonly performed procedure in hematology-oncology practice. Although complications are uncommon, they can cause significant morbidity and mortality. Simulation models are an excellent tool to teach novice doctors basic procedural skills before performing the actual procedure on patients to improve patient safety and well-being. There are no commercial BMAT simulators, and this technical report describes the rationale, technical specifications, and construction of a low-cost, easily constructed, reusable BMAT simulator that reproduced the tactile properties of tissue layers for use as a teaching tool in our resident BMAT simulation course. Preliminary data of learner responses to the simulator were also collected. From April 2013 to November 2013, 32 internal medicine residents underwent the BMAT simulation course. Eighteen (56%) completed the online survey, 11 residents with previous experience doing BMAT and 7 without experience. Despite the difference in operative experience, both experienced and novice residents all agreed or strongly agreed that the model aided their understanding of the BMAT procedure. All agreed or strongly agreed that this enhanced their knowledge of anatomy and 16 residents (89%) agreed or strongly agreed that this model was a realistic simulator. We present a novel, low-cost, easily constructed, realistic BMAT simulator for training novice doctors to perform BMAT.

  3. How, When, and Where? Assessing Renewable Energy Self-Sufficiency at the Neighborhood Level.

    PubMed

    Grosspietsch, David; Thömmes, Philippe; Girod, Bastien; Hoffmann, Volker H

    2018-02-20

    Self-sufficient decentralized systems challenge the centralized energy paradigm. Although scholars have assessed specific locations and technological aspects, it remains unclear how, when, and where energy self-sufficiency could become competitive. To address this gap, we develop a techno-economic model for energy self-sufficient neighborhoods that integrates solar photovoltaics (PV), conversion, and storage technologies. We assess the cost of 100% self-sufficiency for both electricity and heat, comparing different technical configurations for a stylized neighborhood in Switzerland and juxtaposing these findings with projections on market and technology development. We then broaden the scope and vary the neighborhood's composition (residential share) and geographic position (along different latitudes). Regarding how to design self-sufficient neighborhoods, we find two promising technical configurations. The "PV-battery-hydrogen" configuration is projected to outperform a fossil-fueled and grid-connected reference configuration when energy prices increase by 2.5% annually and cost reductions in hydrogen-related technologies by a factor of 2 are achieved. The "PV-battery" configuration would allow achieving parity with the reference configuration sooner, at 21% cost reduction. Additionally, more cost-efficient deployment is found in neighborhoods where the end-use is small commercial or mixed and in regions where seasonal fluctuations are low and thus allow for reducing storage requirements.

  4. A Socio-Technical Exploration for Reducing & Mitigating the Risk of Retained Foreign Objects

    PubMed Central

    Corrigan, Siobhán; Kay, Alison; O’Byrne, Katie; Slattery, Dubhfeasa; Sheehan, Sharon; McDonald, Nick; Smyth, David; Mealy, Ken; Cromie, Sam

    2018-01-01

    A Retained Foreign Object (RFO) is a fairly infrequent but serious adverse event. An accurate rate of RFOs is difficult to establish due to underreporting but it has been estimated that incidences range between 1/1000 and 1/19,000 procedures. The cost of a RFO incident may be substantial and three-fold: (i) the cost to the patient of physical and/or psychological harm; (ii) the reputational cost to an institution and/or healthcare provider; and (iii) the financial cost to the taxpayer in the event of a legal claim. This Health Research Board-funded project aims to analyse and understand the problem of RFOs in surgical and maternity settings in Ireland and develop hospital-specific foreign object management processes and implementation roadmaps. This project will deploy an integrated evidence-based assessment methodology for social-technical modelling (Supply, Context, Organising, Process & Effects/ SCOPE Analysis Cube) and bow tie methodologies that focuses on managing the risks in effectively implementing and sustaining change. It comprises a multi-phase research approach that involves active and ongoing collaboration with clinical and other healthcare staff through each phase of the research. The specific objective of this paper is to present the methodological approach and outline the potential to produce generalisable results which could be applied to other health-related issues. PMID:29642646

  5. Selecting a software development methodology. [of digital flight control systems

    NASA Technical Reports Server (NTRS)

    Jones, R. E.

    1981-01-01

    The state of the art analytical techniques for the development and verification of digital flight control software is studied and a practical designer oriented development and verification methodology is produced. The effectiveness of the analytic techniques chosen for the development and verification methodology are assessed both technically and financially. Technical assessments analyze the error preventing and detecting capabilities of the chosen technique in all of the pertinent software development phases. Financial assessments describe the cost impact of using the techniques, specifically, the cost of implementing and applying the techniques as well as the relizable cost savings. Both the technical and financial assessment are quantitative where possible. In the case of techniques which cannot be quantitatively assessed, qualitative judgements are expressed about the effectiveness and cost of the techniques. The reasons why quantitative assessments are not possible will be documented.

  6. Space power distribution system technology. Volume 1: Reference EPS design

    NASA Technical Reports Server (NTRS)

    Decker, D. K.; Cannady, M. D.; Cassinelli, J. E.; Farber, B. F.; Lurie, C.; Fleck, G. W.; Lepisto, J. W.; Massner, A.; Ritterman, P. F.

    1983-01-01

    The multihundred kilowatt electrical power aspects of a mannable space platform in low Earth orbit is analyzed from a cost and technology viewpoint. At the projected orbital altitudes, Shuttle launch and servicing are technically and economically viable. Power generation is specified as photovoltaic consistent with projected planning. The cost models and trades are based upon a zero interest rate (the government taxes concurrently as required), constant dollars (1980), and costs derived in the first half of 1980. Space platform utilization of up to 30 years is evaluated to fully understand the impact of resupply and replacement as satellite missions are extended. Such lifetimes are potentially realizable with Shuttle servicing capability and are economically desirable.

  7. Decision support for the management of water resources at Sub-middle of the São Francisco river basin in Brazil using integrated hydro-economic modeling and scenarios for land use changes

    NASA Astrophysics Data System (ADS)

    Moraes, M. G. A.; Souza da Silva, G.

    2016-12-01

    Hydro-economic models can measure the economic effects of different operating rules, environmental restrictions, ecosystems services, technical constraints and institutional constraints. Furthermore, water allocation can be improved by considering economical criteria's. Likewise, climate and land use change can be analyzed to provide resilience. We developed and applied a hydro-economic optimization model to determine the optimal water allocation of main users in the Lower-middle São Francisco River Basin in Northeast (NE) Brazil. The model uses demand curves for the irrigation projects, small farmers and human supply, rather than fixed requirements for water resources. This study analyzed various constraints and operating alternatives for the installed hydropower dams in economic terms. A seven-year period (2000-2006) with water scarcity in the past has been selected to analyze the water availability and the associated optimal economic water allocation. The used constraints are technical, socioeconomic and environmental. The economically impacts of scenarios like prioritizing human consumption, impacts of the implementation of the São Francisco river transposition, human supply without high distribution losses, environmental hydrographs, forced reservoir level control, forced reduced reservoir capacity, alteration of lower flow restriction were analyzed. The results in this period show that scarcity costs related ecosystem service and environmental constraints are significant, and have major impacts (increase of scarcity cost) for consumptive users like irrigation projects. In addition, institutional constraints such as prioritizing human supply, minimum release limits downstream of the reservoirs and the implementation of the transposition project impact the costs and benefits of the two main economic sectors (irrigation and power generation) in the region of the Lower-middle of the São Francisco river basin. Scarcity costs for irrigation users generally increase more (in percentage terms) than the other users associated to environmental and institutional constraints.

  8. Office-Based Three-Dimensional Printing Workflow for Craniomaxillofacial Fracture Repair.

    PubMed

    Elegbede, Adekunle; Diaconu, Silviu C; McNichols, Colton H L; Seu, Michelle; Rasko, Yvonne M; Grant, Michael P; Nam, Arthur J

    2018-03-08

    Three-dimensional printing of patient-specific models is being used in various aspects of craniomaxillofacial reconstruction. Printing is typically outsourced to off-site vendors, with the main disadvantages being increased costs and time for production. Office-based 3-dimensional printing has been proposed as a means to reduce costs and delays, but remains largely underused because of the perception among surgeons that it is futuristic, highly technical, and prohibitively expensive. The goal of this report is to demonstrate the feasibility and ease of incorporating in-office 3-dimensional printing into the standard workflow for facial fracture repair.Patients with complex mandible fractures requiring open repair were identified. Open-source software was used to create virtual 3-dimensional skeletal models of the, initial injury pattern, and then the ideally reduced fractures based on preoperative computed tomography (CT) scan images. The virtual 3-dimensional skeletal models were then printed in our office using a commercially available 3-dimensional printer and bioplastic filament. The 3-dimensional skeletal models were used as templates to bend and shape titanium plates that were subsequently used for intraoperative fixation.Average print time was 6 hours. Excluding the 1-time cost of the 3-dimensional printer of $2500, roughly the cost of a single commercially produced model, the average material cost to print 1 model mandible was $4.30. Postoperative CT imaging demonstrated precise, predicted reduction in all patients.Office-based 3-dimensional printing of skeletal models can be routinely used in repair of facial fractures in an efficient and cost-effective manner.

  9. The Relationship between Return on Profitability and Costs of Outsourcing Information Technology Technical Support

    ERIC Educational Resources Information Center

    Odion, Segun

    2011-01-01

    The purpose of this quantitative correlational research study was to examine the relationship between costs of operation and total return on profitability of outsourcing information technology technical support in a two-year period of outsourcing operations. United States of America list of Fortune 1000 companies' chief information officers…

  10. 78 FR 65641 - Midcontinent Independent System Operator, Inc.; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... the allocation of real-time Revenue Sufficiency Guarantee (RSG) costs.\\1\\ In its order, the Commission... to discuss the issues raised by MISO's proposed revisions to its real-time RSG cost allocation... Independent System Operator, Inc.; Notice of Technical Conference By order dated October 16, 2013, in Docket...

  11. Cost-Effective Technical and Vocational Education in Developing Countries. Coombe Lodge Report.

    ERIC Educational Resources Information Center

    Gray, Lynton; Warrender, Ann-Marie

    1993-01-01

    A study examined ways of reducing the costs of technical and vocational education in developing countries. The major study activities were as follows: an extensive literature search; interviews with individuals experienced in designing and delivering vocational programs for developing countries; field investigations in Thailand and Nigeria; and an…

  12. Value Engineering. Technical Manual. School Facilities Development Procedures Manual.

    ERIC Educational Resources Information Center

    Washington Office of the State Superintendent of Public Instruction, Olympia.

    Value Engineering (VE) is a cost-optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. This technical manual provides guidance in developing the scope and applicability of VE to school projects; in…

  13. Space Transfer Concepts and Analyses for Exploration Missions. Technical Directive 12: Beamed Power Systems Study

    NASA Technical Reports Server (NTRS)

    Eder, D.

    1992-01-01

    Parametric models were constructed for Earth-based laser powered electric orbit transfer from low Earth orbit to geosynchronous orbit. These models were used to carry out performance, cost/benefit, and sensitivity analyses of laser-powered transfer systems including end-to-end life cycle cost analyses for complete systems. Comparisons with conventional orbit transfer systems were made indicating large potential cost savings for laser-powered transfer. Approximate optimization was done to determine best parameter values for the systems. Orbit transfer flights simulations were conducted to explore effects of parameters not practical to model with a spreadsheet. The simulations considered view factors that determine when power can be transferred from ground stations to an orbit transfer vehicle and conducted sensitivity analyses for numbers of ground stations, Isp including dual-Isp transfers, and plane change profiles. Optimal steering laws were used for simultaneous altitude and plane change. Viewing geometry and low-thrust orbit raising were simultaneously simulated. A very preliminary investigation of relay mirrors was made.

  14. Field test of an autonomous wind-diesel power plant

    NASA Astrophysics Data System (ADS)

    Fritzsche, A.; Knoebel, U.; Ruckert, W.

    1985-09-01

    An autonomous power plant composed of a wind energy converter and a diesel generator was tested in laboratory and in the field to assess the wind energy supply as a noninfluenceable parameter in the regulation of the mono and bivalent operation of the power plant, for control of the dynamic behavior of the electrical components, for tuning of the regulation expenditure with comfort requirements, and for model evaluation of energy cost analysis. The interaction between meteorological, technical, economic and energy policy aspects was assessed. The relationship between economical use and comfort limits technical improvement. Development of the concept of a bivalent power supply with wind and diesel is recommended.

  15. A strawman SLR program plan for the 1990s

    NASA Technical Reports Server (NTRS)

    Degnan, John J.

    1994-01-01

    A series of programmatic and technical goals for the satellite laser ranging (SLR) network are presented. They are: (1) standardize the performance of the global SLR network; (2) improve the geographic distribution of stations; (3) reduce costs of field operations and data processing; (4) expand the 24 hour temporal coverage to better serve the growing constellation of satellites; (5) improve absolute range accuracy to 2 mm at key stations; (6) improve satellite force, radiative propagation, and station motion models and investigate alternative geodetic analysis techniques; (7) support technical intercomparison and the Terrestrial Reference Frame through global collocations; (8) investigate potential synergisms between GPS and SLR.

  16. Public and Private Hospital Services Reform Using Data Envelopment Analysis to Measure Technical, Scale, Allocative, and Cost Efficiencies

    PubMed Central

    Sheikhzadeh, Yaghoub; Roudsari, Abdul V.; Vahidi, Reza Gholi; Emrouznejad, Ali; Dastgiri, Saeed

    2012-01-01

    Background: The aim of this study was to suggest a suitable context to develop efficient hospital systems while maintaining the quality of care at minimum expenditures. Methods: This research aimed to present a model of efficiency for selected public and private hospitals of East Azerbaijani Province of Iran by making use of Data Envelopment Analysis approach in order to recognize and suggest the best practice standards. Results: Among the six inefficient hospitals, 2 (33%) had a technical efficiency score of less than 50% (both private), 2 (33%) between 51 and 74% (one private and one public) and the rest (2, 33%) between 75 and 99% (one private and one public). Conclusion: In general, the public hospitals are relatively more efficient than private ones; it is recommended for inefficient hospitals to make use of the followings: transferring, selling, or renting idle/unused beds; transferring excess doctors and nurses to the efficient hospitals or other health centers; pensioning off, early retirement clinic officers, technicians/technologists, and other technical staff. The saving obtained from the above approaches could be used to improve remuneration for remaining staff and quality of health care services of hospitals, rural and urban health centers, support communities to start or sustain systematic risk and resource pooling and cost sharing mechanisms for protecting beneficiaries against unexpected health care costs, compensate the capital depreciation, increasing investments, and improve diseases prevention services and facilities in the provincial level. PMID:24688915

  17. Public and private hospital services reform using data envelopment analysis to measure technical, scale, allocative, and cost efficiencies.

    PubMed

    Sheikhzadeh, Yaghoub; Roudsari, Abdul V; Vahidi, Reza Gholi; Emrouznejad, Ali; Dastgiri, Saeed

    2012-01-01

    The aim of this study was to suggest a suitable context to develop efficient hospital systems while maintaining the quality of care at minimum expenditures. This research aimed to present a model of efficiency for selected public and private hospitals of East Azerbaijani Province of Iran by making use of Data Envelopment Analysis approach in order to recognize and suggest the best practice standards. Among the six inefficient hospitals, 2 (33%) had a technical efficiency score of less than 50% (both private), 2 (33%) between 51 and 74% (one private and one public) and the rest (2, 33%) between 75 and 99% (one private and one public). In general, the public hospitals are relatively more efficient than private ones; it is recommended for inefficient hospitals to make use of the followings: transferring, selling, or renting idle/unused beds; transferring excess doctors and nurses to the efficient hospitals or other health centers; pensioning off, early retirement clinic officers, technicians/technologists, and other technical staff. The saving obtained from the above approaches could be used to improve remuneration for remaining staff and quality of health care services of hospitals, rural and urban health centers, support communities to start or sustain systematic risk and resource pooling and cost sharing mechanisms for protecting beneficiaries against unexpected health care costs, compensate the capital depreciation, increasing investments, and improve diseases prevention services and facilities in the provincial level.

  18. Evaluation of ERDA-sponsored coal feed system development

    NASA Technical Reports Server (NTRS)

    Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.

    1977-01-01

    Coal feeders were evaluated based upon criteria such as technical feasibility, performance (i.e. ability to meet process requirements), projected life cycle costs, and projected development cost. An initial set of feeders was selected based on the feeders' cost savings potential compared with baseline lockhopper systems. Additional feeders were considered for selection based on: (1) increasing the probability of successful feeder development; (2) application to specific processes; and (3) technical merit. A coal feeder development program is outlined.

  19. The Taguchi Method Application to Improve the Quality of a Sustainable Process

    NASA Astrophysics Data System (ADS)

    Titu, A. M.; Sandu, A. V.; Pop, A. B.; Titu, S.; Ciungu, T. C.

    2018-06-01

    Taguchi’s method has always been a method used to improve the quality of the analyzed processes and products. This research shows an unusual situation, namely the modeling of some parameters, considered technical parameters, in a process that is wanted to be durable by improving the quality process and by ensuring quality using an experimental research method. Modern experimental techniques can be applied in any field and this study reflects the benefits of interacting between the agriculture sustainability principles and the Taguchi’s Method application. The experimental method used in this practical study consists of combining engineering techniques with experimental statistical modeling to achieve rapid improvement of quality costs, in fact seeking optimization at the level of existing processes and the main technical parameters. The paper is actually a purely technical research that promotes a technical experiment using the Taguchi method, considered to be an effective method since it allows for rapid achievement of 70 to 90% of the desired optimization of the technical parameters. The missing 10 to 30 percent can be obtained with one or two complementary experiments, limited to 2 to 4 technical parameters that are considered to be the most influential. Applying the Taguchi’s Method in the technique and not only, allowed the simultaneous study in the same experiment of the influence factors considered to be the most important in different combinations and, at the same time, determining each factor contribution.

  20. A generalized analysis of solar space heating

    NASA Astrophysics Data System (ADS)

    Clark, J. A.

    A life-cycle model is developed for solar space heating within the United States. The model consists of an analytical relationship among five dimensionless parameters that include all pertinent technical, climatological, solar, operating and economic factors that influence the performance of a solar space heating system. An important optimum condition presented is the break-even metered cost of conventional fuel at which the cost of the solar system is equal to that of a conventional heating system. The effect of Federal (1980) and State (1979) income tax credits on these costs is determined. A parameter that includes both solar availability and solar system utilization is derived and plotted on a map of the U.S. This parameter shows the most favorable present locations for solar space heating application to be in the Central and Mountain States. The data employed are related to the rehabilitated solar data recently made available by the National Climatic Center.

  1. Revisiting the utility of technical performance scores following tetralogy of Fallot repair.

    PubMed

    Lodin, Daud; Mavrothalassitis, Orestes; Haberer, Kim; Sunderji, Sherzana; Quek, Ruben G W; Peyvandi, Shabnam; Moon-Grady, Anita; Karamlou, Tara

    2017-08-01

    Although an important quality metric, current technical performance scores may not be generalizable and may omit operative factors that influence outcomes. We examined factors not included in current technical performance scores that may contribute to increased postoperative length of stay, major complications, and cost after primary repair of tetralogy of Fallot. This is a retrospective single site study of patients younger than age 2 years with tetralogy of Fallot undergoing complete repair between 2007 and 2015. Medical record data and discharge echocardiograms were reviewed to ascertain component and composite technical performance scores. Primary outcomes included postoperative length of stay, major complications, and total hospital costs. Multivariable logistic and linear regression identified determinants of each outcome. Patient population (n = 115) had a median postoperative length of stay of 8 days (interquartile range, 6-10 days), and a median total cost of $71,147. Major complications occurred in 33 patients (29%) with 1 death. Technical performance scores assigned were optimum in 28 patients (25%), adequate in 59 patients (52%), and inadequate in 26 patients (23%). Neither technical performance score components nor composite scores were associated with increased postoperative length of stay. Optimum or adequate repairs versus inadequate had equal risk of a complication (P = .79), and equivalent mean total cost ($100,000 vs $187,000; P = .25). Longer cardiopulmonary bypass time per 1-minute increase (P < .01) was associated with longer postoperative length of stay and reintervention (P = .02). The need to return to bypass also increased total cost (P < .01). Current tetralogy of Fallot technical performance scores were not associated with selected outcomes in our postoperative population. Although returning to bypass and bypass length are not included as components in the current score, these are important factors influencing complications and resource use in our population. Revisions anticipated from a prospective trial should consider including these variables. Copyright © 2017 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  2. New Desktop Virtual Reality Technology in Technical Education

    ERIC Educational Resources Information Center

    Ausburn, Lynna J.; Ausburn, Floyd B.

    2008-01-01

    Virtual reality (VR) that immerses users in a 3D environment through use of headwear, body suits, and data gloves has demonstrated effectiveness in technical and professional education. Immersive VR is highly engaging and appealing to technically skilled young Net Generation learners. However, technical difficulty and very high costs have kept…

  3. Assessment of distributed solar power systems: Issues and impacts

    NASA Astrophysics Data System (ADS)

    Moyle, R. A.; Chernoff, H.; Schweizer, T. C.; Patton, J. B.

    1982-11-01

    The installation of distributed solar-power systems presents electric utilities with a host of questions. Some of the technical and economic impacts of these systems are discussed. Among the technical interconnect issues are isolated operation, power quality, line safety, and metering options. Economic issues include user purchase criteria, structures and installation costs, marketing and product distribution costs, and interconnect costs. An interactive computer program that allows easy calculation of allowable system prices and allowable generation-equipment prices was developed as part of this project. It is concluded that the technical problems raised by distributed solar systems are surmountable, but their resolution may be costly. The stringent purchase criteria likely to be imposed by many potential system users and the economies of large-scale systems make small systems (less than 10 to 20 kW) less attractive than larger systems. Utilities that consider life-cycle costs in making investment decisions and third-party investors who have tax and financial advantages are likely to place the highest value on solar-power systems.

  4. Predictive risk stratification model: a progressive cluster-randomised trial in chronic conditions management (PRISMATIC) research protocol

    PubMed Central

    2013-01-01

    Background An ageing population increases demand on health and social care. New approaches are needed to shift care from hospital to community and general practice. A predictive risk stratification tool (Prism) has been developed for general practice that estimates risk of an emergency hospital admission in the following year. We present a protocol for the evaluation of Prism. Methods/Design We will undertake a mixed methods progressive cluster-randomised trial. Practices begin as controls, delivering usual care without Prism. Practices will receive Prism and training randomly, and thereafter be able to use Prism with clinical and technical support. We will compare costs, processes of care, satisfaction and patient outcomes at baseline, 6 and 18 months, using routine data and postal questionnaires. We will assess technical performance by comparing predicted against actual emergency admissions. Focus groups and interviews will be undertaken to understand how Prism is perceived and adopted by practitioners and policy makers. We will model data using generalised linear models and survival analysis techniques to determine whether any differences exist between intervention and control groups. We will take account of covariates and explanatory factors. In the economic evaluation we will carry out a cost-effectiveness analysis to examine incremental cost per emergency admission to hospital avoided and will examine costs versus changes in primary and secondary outcomes in a cost-consequence analysis. We will also examine changes in quality of life of patients across the risk spectrum. We will record and transcribe focus groups and interviews and analyse them thematically. We have received full ethical and R&D approvals for the study and Information Governance Review Panel (IGRP) permission for the use of routine data. We will comply with the CONSORT guidelines and will disseminate the findings at national and international conferences and in peer-reviewed journals. Discussion The proposed study will provide information on costs and effects of Prism; how it is used in practice, barriers and facilitators to its implementation; and its perceived value in supporting the management of patients with and at risk of developing chronic conditions. Trial registration Controlled Clinical Trials ISRCTN no. ISRCTN55538212. PMID:24330749

  5. A Comparison of Four Software Programs for Implementing Decision Analytic Cost-Effectiveness Models.

    PubMed

    Hollman, Chase; Paulden, Mike; Pechlivanoglou, Petros; McCabe, Christopher

    2017-08-01

    The volume and technical complexity of both academic and commercial research using decision analytic modelling has increased rapidly over the last two decades. The range of software programs used for their implementation has also increased, but it remains true that a small number of programs account for the vast majority of cost-effectiveness modelling work. We report a comparison of four software programs: TreeAge Pro, Microsoft Excel, R and MATLAB. Our focus is on software commonly used for building Markov models and decision trees to conduct cohort simulations, given their predominance in the published literature around cost-effectiveness modelling. Our comparison uses three qualitative criteria as proposed by Eddy et al.: "transparency and validation", "learning curve" and "capability". In addition, we introduce the quantitative criterion of processing speed. We also consider the cost of each program to academic users and commercial users. We rank the programs based on each of these criteria. We find that, whilst Microsoft Excel and TreeAge Pro are good programs for educational purposes and for producing the types of analyses typically required by health technology assessment agencies, the efficiency and transparency advantages of programming languages such as MATLAB and R become increasingly valuable when more complex analyses are required.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schatz, Glenn

    Higher education uses less energy per square foot than most commercial building sectors. However, higher education campuses house energy-intensive laboratories and data centers that may spend more than this average; laboratories, in particular, are disproportionately represented in the higher education sector. The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems–including some considered too costly or technologically challenging–and used advanced energy modeling to achieve peak whole-building performance.more » Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions.« less

  7. Gain optimization with non-linear controls

    NASA Technical Reports Server (NTRS)

    Slater, G. L.; Kandadai, R. D.

    1984-01-01

    An algorithm has been developed for the analysis and design of controls for non-linear systems. The technical approach is to use statistical linearization to model the non-linear dynamics of a system by a quasi-Gaussian model. A covariance analysis is performed to determine the behavior of the dynamical system and a quadratic cost function. Expressions for the cost function and its derivatives are determined so that numerical optimization techniques can be applied to determine optimal feedback laws. The primary application for this paper is centered about the design of controls for nominally linear systems but where the controls are saturated or limited by fixed constraints. The analysis is general, however, and numerical computation requires only that the specific non-linearity be considered in the analysis.

  8. Remote sensing for developing world agriculture: opportunities and areas for technical development

    NASA Astrophysics Data System (ADS)

    Jeunnette, Mark N.; Hart, Douglas P.

    2016-10-01

    A parameterized numerical model is constructed to compare platform options for collecting aerial imagery to support agriculture electronic information services in developing countries like India. A sensitivity analysis shows that when Unmanned Aerial Vehicles, UAVs, are limited in flight altitude by regulations, the velocity and altitude available to manned aircraft lead to a lower cost of operation at altitudes greater than 2000ft above ground level, AGL. If, however, the UAVs are allowed to fly higher, they become cost-competitive once again at approximately 1000ft AGL or higher. Examination of assumptions in the model highlights two areas for additional technology development: baseline-dependent feature-based image registration to enable wider area coverage, and reflectance reconstruction for ratio-based agriculture indices.

  9. Managing Technical and Cost Uncertainties During Product Development in a Simulation-Based Design Environment

    NASA Technical Reports Server (NTRS)

    Karandikar, Harsh M.

    1997-01-01

    An approach for objective and quantitative technical and cost risk analysis during product development, which is applicable from the earliest stages, is discussed. The approach is supported by a software tool called the Analytical System for Uncertainty and Risk Estimation (ASURE). Details of ASURE, the underlying concepts and its application history, are provided.

  10. The Application and Evaluation of PLATO IV in AF Technical Training.

    ERIC Educational Resources Information Center

    Mockovak, William P.; And Others

    The Air Force has been plagued with the rising cost of technical training and has increasingly turned to computer-assisted instruction (CAI) for better cost effectiveness. Toward this aim a trial of PLATO IV, a CAI system utilizing a graphic display and centered at the University of Illinois, was initiated at the Chanute and Sheppard training…

  11. Reducing the Cost of Technical and Vocational Education. Education Research. A Report to the Overseas Development Administration.

    ERIC Educational Resources Information Center

    Gray, Lynton; And Others

    This report describes research that examined ways of reducing the costs of technical and vocational education programs, particularly in developing countries. The report is organized in three sections. The first section offers an extensive survey of recent and current literature, augmented by perspectives obtained from interviews with key…

  12. A Technical, User and Cost Comparison Study of Microfiche Duplicate Film Material. Final Report.

    ERIC Educational Resources Information Center

    Prevel, James J.

    A technical, user and cost comparison study was undertaken to provide the Educational Resources Information Clearinghouse (ERIC) staff with data on silver halide, diazo, and vesicular type films for microfiche duplication. This information will allow ERIC to determine if diazo and/or vesicular films should be considered in producing ERIC duplicate…

  13. Automation life-cycle cost model

    NASA Technical Reports Server (NTRS)

    Gathmann, Thomas P.; Reeves, Arlinda J.; Cline, Rick; Henrion, Max; Ruokangas, Corinne

    1992-01-01

    The problem domain being addressed by this contractual effort can be summarized by the following list: Automation and Robotics (A&R) technologies appear to be viable alternatives to current, manual operations; Life-cycle cost models are typically judged with suspicion due to implicit assumptions and little associated documentation; and Uncertainty is a reality for increasingly complex problems and few models explicitly account for its affect on the solution space. The objectives for this effort range from the near-term (1-2 years) to far-term (3-5 years). In the near-term, the envisioned capabilities of the modeling tool are annotated. In addition, a framework is defined and developed in the Decision Modelling System (DEMOS) environment. Our approach is summarized as follows: Assess desirable capabilities (structure into near- and far-term); Identify useful existing models/data; Identify parameters for utility analysis; Define tool framework; Encode scenario thread for model validation; and Provide transition path for tool development. This report contains all relevant, technical progress made on this contractual effort.

  14. The contribution of Raman spectroscopy to the analytical quality control of cytotoxic drugs in a hospital environment: eliminating the exposure risks for staff members and their work environment.

    PubMed

    Bourget, Philippe; Amin, Alexandre; Vidal, Fabrice; Merlette, Christophe; Troude, Pénélope; Baillet-Guffroy, Arlette

    2014-08-15

    The purpose of the study was to perform a comparative analysis of the technical performance, respective costs and environmental effect of two invasive analytical methods (HPLC and UV/visible-FTIR) as compared to a new non-invasive analytical technique (Raman spectroscopy). Three pharmacotherapeutic models were used to compare the analytical performances of the three analytical techniques. Statistical inter-method correlation analysis was performed using non-parametric correlation rank tests. The study's economic component combined calculations relative to the depreciation of the equipment and the estimated cost of an AQC unit of work. In any case, analytical validation parameters of the three techniques were satisfactory, and strong correlations between the two spectroscopic techniques vs. HPLC were found. In addition, Raman spectroscopy was found to be superior as compared to the other techniques for numerous key criteria including a complete safety for operators and their occupational environment, a non-invasive procedure, no need for consumables, and a low operating cost. Finally, Raman spectroscopy appears superior for technical, economic and environmental objectives, as compared with the other invasive analytical methods. Copyright © 2014 Elsevier B.V. All rights reserved.

  15. Renewable Energy Feasibility Study Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rooney, Tim

    2013-10-30

    The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to assess the feasibility of solar photovoltaic (PV) installations. A solar energy project could provide a number of benefits to the Community in terms of potential future energy savings, increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a solar project’s overall feasibility, including: Technical appropriateness; Solar resource characteristics and expected system performance; Levelized cost of electricity (LCOE) economic assessment. The Gila River Indian Community (GRIC or the Community) contracted the ANTARESmore » Group, Inc. (“ANTARES”) to prepare a biomass resource assessment study and evaluate the feasibility of a bioenergy project on Community land. A biomass project could provide a number of benefits to the Community in terms of increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a biomass project’s overall feasibility, including: Resource analysis and costs; Identification of potential bioenergy projects; Technical and economic (levelized cost of energy) modeling for selected project configuration.« less

  16. Solar central electric power generation - A baseline design

    NASA Technical Reports Server (NTRS)

    Powell, J. C.

    1976-01-01

    The paper presents the conceptual technical baseline design of a solar electric power plant using the central receiver concept, and derives credible cost estimates from the baseline design. The major components of the plant - heliostats, tower, receiver, tower piping, and thermal storage - are discussed in terms of technical and cost information. The assumed peak plant output is 215 MW(e), over 4000 daylight hours. The contribution of total capital investment to energy cost is estimated to be about 55 mills per kwh in mid-1974 dollars.

  17. Cost-Benefit Analysis of a Bridge to Integrate the Management of Technical Information for Producing Technical Manuals and Training Courses

    DTIC Science & Technology

    2010-11-01

    Philadelphia, and all Computer-Based Training (CBT) courses delivered by Navy eLearning (NeL), a part of the Naval Education and Training Command (NETC...concentrated exclu- sively on the benefit side—whether the Bridge would save money in producing future technical manuals and training courses. It...of $78.1 million in 10-year costs: a savings of $86.8 million in producing future HM&E manuals and NeL-delivered courses less $8.7 million in

  18. An analysis of information design and packaging for an inelastic market

    NASA Technical Reports Server (NTRS)

    Pinelli, T. E.; Mccullough, R.; Cordle, V. M.

    1982-01-01

    Producers of technical reports can increase the potential use of the technical report, as an information product, by making certain changes to the sequential, language, and presentation components. These improvements, which effect the overall design and packaging of the product, are discussed. These improvements are likely to have their greatest impact on the marginal technical report user. However, these improvements are not without economic consideration. For this reason, cost factors should be calculated to ensure that benefits to the user and/or increased utility will outweight the cost to the producer.

  19. Can CH-53K 3D Technical Data Support the Provisioning Process

    DTIC Science & Technology

    2017-05-01

    contain the minimum required data characteristics and elements (Appendix A) and (2) are fully anno - tated, they can be converted to 3D PDF files that...were anno - tated as part of the original model development/creation process, the time to perform an annotation would be about 50 percent (about 1.5...files, after the fact. If the models had been anno - tated at the time they were created, we estimate that the cost to implement a 3D PDF solution for

  20. Terry Turbopump Analytical Modeling Efforts in Fiscal Year 2016 ? Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osborn, Douglas; Ross, Kyle; Cardoni, Jeffrey N

    This document details the Fiscal Year 2016 modeling efforts to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) experiments. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

  1. Vaginal Examination Simulation Using Citrus Fruit to Simulate Cervical Dilation and Effacement

    PubMed Central

    Shea, Kathleen L

    2015-01-01

    This technical report describes the creation and use of a cervical dilation and effacement model in a pre-licensure nursing course in reproductive health. Vaginal examination is typically taught in reproductive health courses; however, nursing students do not always have sufficient opportunity to practice on actual patients. This low-cost task-training model provides undergraduate nursing students the opportunity to experience performing a vaginal examination to assess for cervical dilation and effacement during the labor process. PMID:26457235

  2. Establishing a cost-per-result of laboratory-based, reflex Cryptococcal antigenaemia screening (CrAg) in HIV+ patients with CD4 counts less than 100 cells/μl using a Lateral Flow Assay (LFA) at a typical busy CD4 laboratory in South Africa.

    PubMed

    Cassim, Naseem; Schnippel, Kathryn; Coetzee, Lindi Marie; Glencross, Deborah Kim

    2017-01-01

    Cryptococcal meningitis is a major cause of mortality and morbidity in countries with high HIV prevalence, primarily affecting patients whose CD4 are < = 100 cells/μl. Routine Cryptococcal Antigen (CrAg) screening is thus recommended in the South African HIV treatment guidelines for all patients with CD4 counts < = 100 cells/μl, followed by pre-emptive anti-fungal therapy where CrAg results are positive. A laboratory-based reflexed CrAg screening approach, using a Lateral Flow Assay (LFA) on remnant EDTA CD4 blood samples, was piloted at three CD4 laboratories. This study aimed to assess the cost-per-result of laboratory-based reflexed CrAg screening at one pilot CD4 referral laboratory. CD4 test volumes from 2014 were extracted to estimate percentage of CD4 < = 100 cells/μl. Daily average volumes were derived, assuming 12 months per/year and 21.73 working days per/month. Costing analyses were undertaken using Microsoft Excel and Stata with a provider prospective. The cost-per-result was estimated using a bottom-up method, inclusive of test kits and consumables (reagents), laboratory equipment and technical effort costs. The ZAR/$ exchange of 14.696/$1 was used, where applicable. One-way sensitivity analyses on the cost-per-result were conducted for possible error rates (3%- 8%, reductions or increases in reagent costs as well as test volumes (ranging from -60% to +60%). The pilot CD4 laboratory performed 267000 CD4 tests in 2014; ~ 9.3% (27500) reported CD4< = 100 cells/μl, equivalent to 106 CrAg tests performed daily. A batch of 30-tests could be performed in 1.6 hours, including preparation and analysis time. A cost-per-result of $4.28 was reported, with reagents contributing $3.11 (72.8%), while technical effort and laboratory equipment overheads contributed $1.17 (27.2%) and $0.03 (<1%) respectively. One-way sensitivity analyses including increasing or decreasing test volumes by 60% revealed a cost-per-result range of $3.84 to $6.03. A cost-per-result of $4.28 was established in a typical CD4 service laboratory to enable local budgetary cost projections and programmatic cost-effectiveness modelling. Varying reagent costs linked to currency exchange and varying test volumes in different levels of service can lead to varying cost-per-test and technical effort to manage workload, with an inverse relationship of higher costs expected at lower volumes of tests.

  3. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoessel, Chris

    2013-11-13

    This project developed a new high-performance R-10/high SHGC window design, reviewed market positioning and evaluated manufacturing solutions required for broad market adoption. The project objectives were accomplished by: identifying viable technical solutions based on modeling of modern and potential coating stacks and IGU designs; development of new coating material sets for HM thin film stacks, as well as improved HM IGU designs to accept multiple layers of HM films; matching promising new coating designs with new HM IGU designs to demonstrate performance gains; and, in cooperation with a window manufacturer, assess the potential for high-volume manufacturing and cost efficiency ofmore » a HM-based R-10 window with improved solar heat gain characteristics. A broad view of available materials and design options was applied to achieve the desired improvements. Gated engineering methodologies were employed to guide the development process from concept generation to a window demonstration. The project determined that a slightly de-rated window performance allows formulation of a path to achieve the desired cost reductions to support end consumer adoption.« less

  4. Analysis of factors determining enterprise value of company merger and acquisition: A case study of coal in Kalimantan, Indonesia

    NASA Astrophysics Data System (ADS)

    Candra, Ade; Pasasa, Linus A.; Simatupang, Parhimpunan

    2015-09-01

    The main purpose of this paper is looking at the relationship between the factors of technical, financial and legal with enterprise value in mergers and acquisitions of coal companies in Kalimantan, Indonesia over the last 10 years. Data obtained from secondary data sources in the company works and from published data on the internet. The data thus obtained are as many as 46 secondary data with parameters resources, reserves, stripping ratio, calorific value, distance from pit to port, and distance from ports to vessels, production per annum, the cost from pit to port, from port to vessel costs, royalties, coal price and permit status. The data was analysis using structural equation modeling (SEM) to determine the factors that most significant influence enterprise value of coal company in Kalimantan. The result shows that a technical matter is the factor that most affects the value of enterprise in coal merger and acquisition company. Financial aspect is the second factor that affects the enterprise value.

  5. The future viability of algae-derived biodiesel under economic and technical uncertainties.

    PubMed

    Brownbridge, George; Azadi, Pooya; Smallbone, Andrew; Bhave, Amit; Taylor, Benjamin; Kraft, Markus

    2014-01-01

    This study presents a techno-economic assessment of algae-derived biodiesel under economic and technical uncertainties associated with the development of algal biorefineries. A global sensitivity analysis was performed using a High Dimensional Model Representation (HDMR) method. It was found that, considering reasonable ranges over which each parameter can vary, the sensitivity of the biodiesel production cost to the key input parameters decreases in the following order: algae oil content>algae annual productivity per unit area>plant production capacity>carbon price increase rate. It was also found that the Return on Investment (ROI) is highly sensitive to the algae oil content, and to a lesser extent to the algae annual productivity, crude oil price and price increase rate, plant production capacity, and carbon price increase rate. For a large scale plant (100,000 tonnes of biodiesel per year) the production cost of biodiesel is likely to be £0.8-1.6 per kg. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Primary urethral reconstruction: the cost minimized approach to the bulbous urethral stricture.

    PubMed

    Rourke, Keith F; Jordan, Gerald H

    2005-04-01

    Treatment for urethral stricture disease often requires a choice between readily available direct vision internal urethrotomy (DVIU) and highly efficacious but more technically complex open urethral reconstruction. Using the short segment bulbous urethral stricture as a model, we determined which strategy is less costly. The costs of DVIU and open urethral reconstruction with stricture excision and primary anastomosis for a 2 cm bulbous urethral stricture were compared using a cost minimization decision analysis model. Clinical probability estimates for the DVIU treatment arm were the risk of bleeding, urinary tract infection and the risk of stricture recurrence. Estimates for the primary urethral reconstruction strategy were the risk of wound complications, complications of exaggerated lithotomy and the risk of treatment failure. Direct third party payer costs were determined in 2002 United States dollars. The model predicted that treatment with DVIU was more costly (17,747 dollars per patient) than immediate open urethral reconstruction (16,444 dollars per patient). This yielded an incremental cost savings of $1,304 per patient, favoring urethral reconstruction. Sensitivity analysis revealed that primary treatment with urethroplasty was economically advantageous within the range of clinically relevant events. Treatment with DVIU became more favorable when the long-term risk of stricture recurrence after DVIU was less than 60%. Treatment for short segment bulbous urethral strictures with primary reconstruction is less costly than treatment with DVIU. From a fiscal standpoint urethral reconstruction should be considered over DVIU in the majority of clinical circumstances.

  7. Life cycle costing of waste management systems: Overview, calculation principles and case studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martinez-Sanchez, Veronica, E-mail: vems@env.dtu.dk; Kromann, Mikkel A.; Astrup, Thomas Fruergaard

    2015-02-15

    Highlights: • We propose a comprehensive model for cost assessment of waste management systems. • The model includes three types of LCC: Conventional, Environmental and Societal LCCs. • The applicability of the proposed model is tested with two case studies. - Abstract: This paper provides a detailed and comprehensive cost model for the economic assessment of solid waste management systems. The model was based on the principles of Life Cycle Costing (LCC) and followed a bottom-up calculation approach providing detailed cost items for all key technologies within modern waste systems. All technologies were defined per tonne of waste input, andmore » each cost item within a technology was characterised by both a technical and an economic parameter (for example amount and cost of fuel related to waste collection), to ensure transparency, applicability and reproducibility. Cost items were classified as: (1) budget costs, (2) transfers (for example taxes, subsidies and fees) and (3) externality costs (for example damage or abatement costs related to emissions and disamenities). Technology costs were obtained as the sum of all cost items (of the same type) within a specific technology, while scenario costs were the sum of all technologies involved in a scenario. The cost model allows for the completion of three types of LCC: a Conventional LCC, for the assessment of financial costs, an Environmental LCC, for the assessment of financial costs whose results are complemented by a Life Cycle Assessment (LCA) for the same system, and a Societal LCC, for socio-economic assessments. Conventional and Environmental LCCs includes budget costs and transfers, while Societal LCCs includes budget and externality costs. Critical aspects were found in the existing literature regarding the cost assessment of waste management, namely system boundary equivalency, accounting for temporally distributed emissions and impacts, inclusions of transfers, the internalisation of environmental impacts and the coverage of shadow prices, and there was also significant confusion regarding terminology. The presented cost model was implemented in two case study scenarios assessing the costs involved in the source segregation of organic waste from 100,000 Danish households and the subsequent co-digestion of organic waste with animal manure. Overall, source segregation resulted in higher financial costs than the alternative of incinerating the organic waste with the residual waste: 1.6 M€/year, of which 0.9 M€/year was costs for extra bins and bags used by the households, 1.0 M€/year for extra collections and −0.3 M€/year saved on incineration.« less

  8. A stochastic frontier analysis of technical efficiency of fish cage culture in Peninsular Malaysia.

    PubMed

    Islam, Gazi Md Nurul; Tai, Shzee Yew; Kusairi, Mohd Noh

    2016-01-01

    Cage culture plays an important role in achieving higher output and generating more export earnings in Malaysia. However, the cost of fingerlings, feed and labour have increased substantially for cage culture in the coastal areas in Peninsular Malaysia. This paper uses farm level data gathered from Manjung, Perak and Kota Tinggi, Johor to investigate the technical efficiency of brackish water fish cage culture using the stochastic frontier approach. The technical efficiency was estimated and specifically the factors affecting technical inefficiencies of fish cage culture system in Malaysia was investigated. On average, 37 percent of the sampled fish cage farms are technically efficient. The results suggest very high degrees of technical inefficiency exist among the cage culturists. This implies that great potential exists to increase fish production through improved efficiency in cage culture management in Peninsular Malaysia. The results indicate that farmers obtained grouper fingerlings from other neighboring countries due to scarcity of fingerlings from wild sources. The cost of feeding for grouper (Epinephelus fuscoguttatus) requires relatively higher costs compared to seabass (Lates calcarifer) production in cage farms in the study areas. Initiatives to undertake extension programmes at the farm level are needed to help cage culturists in utilizing their resources more efficiently in order to substantially enhance their fish production.

  9. Cost effectiveness of an internet-delivered lifestyle intervention in primary care patients with high cardiovascular risk.

    PubMed

    Smith, Kenneth J; Kuo, Shihchen; Zgibor, Janice C; McTigue, Kathleen M; Hess, Rachel; Bhargava, Tina; Bryce, Cindy L

    2016-06-01

    To assess the cost-effectiveness of an online adaptation of the diabetes prevention program (ODPP) lifestyle intervention. ODPP was a before-after evaluation of a weight loss intervention comprising 16 weekly and 8 monthly lessons, incorporating behavioral tools and regular, brief, web-based individualized counseling in an overweight/obese cohort (mean age 52, 76% female, 92% white, 28% with diabetes). A Markov model was developed to estimate ODPP cost effectiveness compared with usual care (UC) to reduce metabolic risk over 10years. Intervention costs and weight change outcomes were obtained from the study; other model parameters were based on published reports. In the model, diabetes risk was a function of weight change with and without the intervention. Compared to UC, the ODPP in our cohort cost $14,351 and $29,331 per quality-adjusted life-year (QALY) gained from the health care system and societal perspectives, respectively. In a hypothetical cohort without diabetes, the ODPP cost $7777 and $18,263 per QALY gained, respectively. Results were robust in sensitivity analyses, but enrolling cohorts with lower annual risk of developing diabetes (≤1.8%), enrolling fewer participants (≤15), or increasing the hourly cost (≥$91.20) or annual per-participant time (≥1.45h) required for technical support could increase ODPP cost to >$20,000 per QALY gained. In probabilistic sensitivity analyses, ODPP was cost-effective in 20-58% of model iterations using an acceptability threshold of $20,000, 73-92% at $50,000, and 95-99% at $100,000 per QALY gained. The ODPP may offer an economical approach to combating overweight and obesity. Copyright © 2016 Elsevier Inc. All rights reserved.

  10. 75 FR 41433 - Trade Adjustment Assistance for Farmers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ...-210). Individual asparagus producers, nationwide, interested in applying for technical training and..., producers may receive technical assistance provided at no cost and may receive cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance...

  11. 75 FR 41431 - Trade Adjustment Assistance for Farmers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    .... 107-210). Individual catfish producers, nationwide, interested in applying for technical training and..., producers may receive technical assistance at no cost and may receive cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance under...

  12. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b) Technical personnel shall conduct a comprehensive review of VECPs for technical feasibility, usefulness, and adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  13. Assessing Cost-Effectiveness in Obesity (ACE-Obesity): an overview of the ACE approach, economic methods and cost results

    PubMed Central

    2009-01-01

    Background The aim of the ACE-Obesity study was to determine the economic credentials of interventions which aim to prevent unhealthy weight gain in children and adolescents. We have reported elsewhere on the modelled effectiveness of 13 obesity prevention interventions in children. In this paper, we report on the cost results and associated methods together with the innovative approach to priority setting that underpins the ACE-Obesity study. Methods The Assessing Cost Effectiveness (ACE) approach combines technical rigour with 'due process' to facilitate evidence-based policy analysis. Technical rigour was achieved through use of standardised evaluation methods, a research team that assembles best available evidence and extensive uncertainty analysis. Cost estimates were based on pathway analysis, with resource usage estimated for the interventions and their 'current practice' comparator, as well as associated cost offsets. Due process was achieved through involvement of stakeholders, consensus decisions informed by briefing papers and 2nd stage filter analysis that captures broader factors that influence policy judgements in addition to cost-effectiveness results. The 2nd stage filters agreed by stakeholders were 'equity', 'strength of the evidence', 'feasibility of implementation', 'acceptability to stakeholders', 'sustainability' and 'potential for side-effects'. Results The intervention costs varied considerably, both in absolute terms (from cost saving [6 interventions] to in excess of AUD50m per annum) and when expressed as a 'cost per child' estimate (from

  14. OPTIM: Computer program to generate a vertical profile which minimizes aircraft fuel burn or direct operating cost. User's guide

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A profile of altitude, airspeed, and flight path angle as a function of range between a given set of origin and destination points for particular models of transport aircraft provided by NASA is generated. Inputs to the program include the vertical wind profile, the aircraft takeoff weight, the costs of time and fuel, certain constraint parameters and control flags. The profile can be near optimum in the sense of minimizing: (1) fuel, (2) time, or (3) a combination of fuel and time (direct operating cost (DOC)). The user can also, as an option, specify the length of time the flight is to span. The theory behind the technical details of this program is also presented.

  15. Advanced Launch System propulsion focused technology liquid methane turbopump technical implementation plan

    NASA Technical Reports Server (NTRS)

    Csomor, A.; Nielson, C. E.

    1989-01-01

    This program will focus on the integration of all functional disciplines of the design, manufacturing, materials, fabrication and producibility to define and demonstrate a highly reliable, easily maintained, low cost liquid methane turbopump as a component for the STBE (Space Transportation Booster Engine) using the STME (main engine) oxygen turbopump. A cost model is to be developed to predict the recurring cost of production hardware and operations. A prime objective of the program is to design the liquid methane turbopump to be used in common with a LH2 turbopump optimized for the STME. Time phasing of the effort is presented and interrelationship of the tasks is defined. Major subcontractors are identified and their roles in the program are described.

  16. 3D printing the pterygopalatine fossa: a negative space model of a complex structure.

    PubMed

    Bannon, Ross; Parihar, Shivani; Skarparis, Yiannis; Varsou, Ourania; Cezayirli, Enis

    2018-02-01

    The pterygopalatine fossa is one of the most complex anatomical regions to understand. It is poorly visualized in cadaveric dissection and most textbooks rely on schematic depictions. We describe our approach to creating a low-cost, 3D model of the pterygopalatine fossa, including its associated canals and foramina, using an affordable "desktop" 3D printer. We used open source software to create a volume render of the pterygopalatine fossa from axial slices of a head computerised tomography scan. These data were then exported to a 3D printer to produce an anatomically accurate model. The resulting 'negative space' model of the pterygopalatine fossa provides a useful and innovative aid for understanding the complex anatomical relationships of the pterygopalatine fossa. This model was designed primarily for medical students; however, it will also be of interest to postgraduates in ENT, ophthalmology, neurosurgery, and radiology. The technical process described may be replicated by other departments wishing to develop their own anatomical models whilst incurring minimal costs.

  17. A study on technical efficiency of a DMU (review of literature)

    NASA Astrophysics Data System (ADS)

    Venkateswarlu, B.; Mahaboob, B.; Subbarami Reddy, C.; Sankar, J. Ravi

    2017-11-01

    In this research paper the concept of technical efficiency (due to Farell) [1] of a decision making unit (DMU) has been introduced and the measure of technical and cost efficiencies are derived. Timmer’s [2] deterministic approach to estimate the Cobb-Douglas production frontier has been proposed. The idea of extension of Timmer’s [2] method to any production frontier which is linear in parameters has been presented here. The estimation of parameters of Cobb-Douglas production frontier by linear programming approach has been discussed in this paper. Mark et al. [3] proposed a non-parametric method to assess efficiency. Nuti et al. [4] investigated the relationships among technical efficiency scores, weighted per capita cost and overall performance Gahe Zing Samuel Yank et al. [5] used Data envelopment analysis to assess technical assessment in banking sectors.

  18. A technical, economic, and environmental assessment of amine-based CO2 capture technology for power plant greenhouse gas control.

    PubMed

    Rao, Anand B; Rubin, Edward S

    2002-10-15

    Capture and sequestration of CO2 from fossil fuel power plants is gaining widespread interest as a potential method of controlling greenhouse gas emissions. Performance and cost models of an amine (MEA)-based CO2 absorption system for postcombustion flue gas applications have been developed and integrated with an existing power plant modeling framework that includes multipollutant control technologies for other regulated emissions. The integrated model has been applied to study the feasibility and cost of carbon capture and sequestration at both new and existing coal-burning power plants. The cost of carbon avoidance was shown to depend strongly on assumptions about the reference plant design, details of the CO2 capture system design, interactions with other pollution control systems, and method of CO2 storage. The CO2 avoidance cost for retrofit systems was found to be generally higher than for new plants, mainly because of the higher energy penalty resulting from less efficient heat integration as well as site-specific difficulties typically encountered in retrofit applications. For all cases, a small reduction in CO2 capture cost was afforded by the SO2 emission trading credits generated by amine-based capture systems. Efforts are underway to model a broader suite of carbon capture and sequestration technologies for more comprehensive assessments in the context of multipollutant environmental management.

  19. 75 FR 19677 - Medicare Program; Policy and Technical Changes to the Medicare Advantage and the Medicare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...

  20. Evaluating Self-Funded Health Insurance for the Lakeshore Technical Institute as a Cost-Containment Measure.

    ERIC Educational Resources Information Center

    Holstein, Karen E.

    In response to the rising costs of health care and large increases in insurance premiums, a study was conducted at Lakeshore Technical Institute (LTI) to investigate the feasibility of using a self-funded health insurance plan at the college. Data were obtained through a literature review; telephone and on-site discussions with a personnel…

  1. Cost/Benefit Evaluation of Three English Language Training Programs for Potential Navy Use.

    ERIC Educational Resources Information Center

    Swope, William M.; And Others

    As part of its plans to recruit Hispanic personnel who speak English as a second language, the U.S. Navy will have to provide English language training as well as technical training to prepare these personnel for fleet duty. A cost/benefit analysis was conducted of three English language training programs: the English Technical Language School…

  2. Hanford business structure for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Hanford Business Structure integrates the project`s technical, schedule, and cost baselines; implements the use of a standard code of accounts; and streamlines performance reporting and cost collection. Technical requirements drive the technical functions and come from the RDD 100 database. The functions will be identified in the P3 scheduling system and also in the PeopleSoft system. Projects will break their work down from the technical requirements in the P3 schedules. When the level at which they want to track cost via the code of accounts is reached, a Project ID will be generated in the PeopleSoft system. P3 maymore » carry more detailed schedules below the Project ID level. The standard code of accounts will identify discrete work activities done across the site and various projects. They will include direct and overhead type work scopes. Activities in P3 will roll up to this standard code of accounts. The field that will be used to record this in PeopleSoft is ``Activity``. In Passport it is a user-defined field. It will have to be added to other feeder systems. Project ID and code of accounts are required fields on all cost records.« less

  3. Overview of ARPA low-cost ceramic composites (LC{sup 3}) program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adler, P.N.

    1996-12-31

    Grumman is currently leading an approximate $10M ARPA cost-shared program aimed at developing low-cost fabrication methodology for manufacturing ceramic matrix composite (CMC) structural components. One of the program goals is to demonstrate the effectiveness of an advanced materials partnership. A vertically integrated collaboration now exists that combines the talents of three large private sector organizations, two smaller private sector organizations, three universities, and three federal government laboratories. Work in progress involves preceramic polymer (Blackglas{trademark}) CMC materials technology, RTM and pyrolysis process modeling & simulation, and utilization of low-cost approaches for fabricating a CMC demonstration engine seal component. This paper reviewsmore » the program organization, functioning, and some of the highlights of the technical work, which is of interest to the DoD as well as the commercial sector.« less

  4. Mobil Solar Energy Corporation thin EFG octagons. Final subcontract report, 1 April 1992--31 January 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalejs, J.P.

    1994-06-01

    Mobil Solar Energy Corporation manufactures photovoltaic modules based on its unique Edge-defined Film-fed Growth (EFG) process for producing octagon-shaped hollow polycrystalline silicon tubes. The octagons are cut by lasers into 100 mm x 100 mm wafers which are suitable for solar cell processing. This process avoids slicing, grinding and polishing operations which are wasteful of material and are typical of most other wafer production methods. EFG wafers are fabricated into solar cells and modules using processes that have been specially developed to allow scaling up to high throughput rates. The goals of the Photovoltaic Manufacturing Technology Initiative (PVMaT) program atmore » Mobil Solar were to improve the EFG manufacturing line through technology advances that accelerate cost reduction in production and stimulate market growth for its product. The program was structured into three main tasks: to decrease silicon utilization by lowering wafer thickness from 400 to 200 {mu}m; to enhance laser cutting yields and throughput while improving the wafer strength; and to raise crystal growth productivity and yield. The technical problems faced and the advances made in the Mobil Solar PVMaT program are described. The author concludes with a presentation of the results of a detailed cost model for EFT module production. This model describes the accelerated reductions in manufacturing costs which are already in place and the future benefits anticipated to result from the technical achievements of the PVMaT program.« less

  5. A low-cost, tablet-based option for prehospital neurologic assessment: The iTREAT Study.

    PubMed

    Chapman Smith, Sherita N; Govindarajan, Prasanthi; Padrick, Matthew M; Lippman, Jason M; McMurry, Timothy L; Resler, Brian L; Keenan, Kevin; Gunnell, Brian S; Mehndiratta, Prachi; Chee, Christina Y; Cahill, Elizabeth A; Dietiker, Cameron; Cattell-Gordon, David C; Smith, Wade S; Perina, Debra G; Solenski, Nina J; Worrall, Bradford B; Southerland, Andrew M

    2016-07-05

    In this 2-center study, we assessed the technical feasibility and reliability of a low cost, tablet-based mobile telestroke option for ambulance transport and hypothesized that the NIH Stroke Scale (NIHSS) could be performed with similar reliability between remote and bedside examinations. We piloted our mobile telemedicine system in 2 geographic regions, central Virginia and the San Francisco Bay Area, utilizing commercial cellular networks for videoconferencing transmission. Standardized patients portrayed scripted stroke scenarios during ambulance transport and were evaluated by independent raters comparing bedside to remote mobile telestroke assessments. We used a mixed-effects regression model to determine intraclass correlation of the NIHSS between bedside and remote examinations (95% confidence interval). We conducted 27 ambulance runs at both sites and successfully completed the NIHSS for all prehospital assessments without prohibitive technical interruption. The mean difference between bedside (face-to-face) and remote (video) NIHSS scores was 0.25 (1.00 to -0.50). Overall, correlation of the NIHSS between bedside and mobile telestroke assessments was 0.96 (0.92-0.98). In the mixed-effects regression model, there were no statistically significant differences accounting for method of evaluation or differences between sites. Utilizing a low-cost, tablet-based platform and commercial cellular networks, we can reliably perform prehospital neurologic assessments in both rural and urban settings. Further research is needed to establish the reliability and validity of prehospital mobile telestroke assessment in live patients presenting with acute neurologic symptoms. © 2016 American Academy of Neurology.

  6. A low-cost, tablet-based option for prehospital neurologic assessment

    PubMed Central

    Chapman Smith, Sherita N.; Govindarajan, Prasanthi; Padrick, Matthew M.; Lippman, Jason M.; McMurry, Timothy L.; Resler, Brian L.; Keenan, Kevin; Gunnell, Brian S.; Mehndiratta, Prachi; Chee, Christina Y.; Cahill, Elizabeth A.; Dietiker, Cameron; Cattell-Gordon, David C.; Smith, Wade S.; Perina, Debra G.; Solenski, Nina J.; Worrall, Bradford B.

    2016-01-01

    Objectives: In this 2-center study, we assessed the technical feasibility and reliability of a low cost, tablet-based mobile telestroke option for ambulance transport and hypothesized that the NIH Stroke Scale (NIHSS) could be performed with similar reliability between remote and bedside examinations. Methods: We piloted our mobile telemedicine system in 2 geographic regions, central Virginia and the San Francisco Bay Area, utilizing commercial cellular networks for videoconferencing transmission. Standardized patients portrayed scripted stroke scenarios during ambulance transport and were evaluated by independent raters comparing bedside to remote mobile telestroke assessments. We used a mixed-effects regression model to determine intraclass correlation of the NIHSS between bedside and remote examinations (95% confidence interval). Results: We conducted 27 ambulance runs at both sites and successfully completed the NIHSS for all prehospital assessments without prohibitive technical interruption. The mean difference between bedside (face-to-face) and remote (video) NIHSS scores was 0.25 (1.00 to −0.50). Overall, correlation of the NIHSS between bedside and mobile telestroke assessments was 0.96 (0.92–0.98). In the mixed-effects regression model, there were no statistically significant differences accounting for method of evaluation or differences between sites. Conclusions: Utilizing a low-cost, tablet-based platform and commercial cellular networks, we can reliably perform prehospital neurologic assessments in both rural and urban settings. Further research is needed to establish the reliability and validity of prehospital mobile telestroke assessment in live patients presenting with acute neurologic symptoms. PMID:27281534

  7. Synthesis on construction unit cost development : technical report.

    DOT National Transportation Integrated Search

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  8. Quantifying control effort of biological and technical movements: an information-entropy-based approach.

    PubMed

    Haeufle, D F B; Günther, M; Wunner, G; Schmitt, S

    2014-01-01

    In biomechanics and biorobotics, muscles are often associated with reduced movement control effort and simplified control compared to technical actuators. This is based on evidence that the nonlinear muscle properties positively influence movement control. It is, however, open how to quantify the simplicity aspect of control effort and compare it between systems. Physical measures, such as energy consumption, stability, or jerk, have already been applied to compare biological and technical systems. Here a physical measure of control effort based on information entropy is presented. The idea is that control is simpler if a specific movement is generated with less processed sensor information, depending on the control scheme and the physical properties of the systems being compared. By calculating the Shannon information entropy of all sensor signals required for control, an information cost function can be formulated allowing the comparison of models of biological and technical control systems. Exemplarily applied to (bio-)mechanical models of hopping, the method reveals that the required information for generating hopping with a muscle driven by a simple reflex control scheme is only I=32 bits versus I=660 bits with a DC motor and a proportional differential controller. This approach to quantifying control effort captures the simplicity of a control scheme and can be used to compare completely different actuators and control approaches.

  9. Technical Services Research Needs for the 1990s.

    ERIC Educational Resources Information Center

    Veaner, Allen B.

    1983-01-01

    Research needs in area of library technical services are identified, focusing on costs, the catalog, bibliographic data, new cataloging code, subject access in online catalogs, acquisitions, serials control system, universal technical processing terminals, data storage devices, robots and artificial intelligence, bibliographic instruction, and…

  10. 48 CFR 2052.215-75 - Proposal presentation and format.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., i.e., competitive vs. noncompetitive, and the cost evaluation. (c) “Written Technical and Management... * copies. (1) The written Technical and Management Proposal or Oral Presentation and Supporting... objectives of this procurement. (3) The written Technical Proposal or Oral Presentation and Supporting...

  11. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

  12. The Environment and Directed Technical Change†

    PubMed Central

    Acemoglu, Daron; Aghion, Philippe; Bursztyn, Leonardo

    2015-01-01

    This paper introduces endogenous and directed technical change in a growth model with environmental constraints. The final good is produced from “dirty” and “clean” inputs. We show that: (i) when inputs are sufficiently substitutable, sustainable growth can be achieved with temporary taxes/subsidies that redirect innovation toward clean inputs; (ii) optimal policy involves both “carbon taxes” and research subsidies, avoiding excessive use of carbon taxes; (iii) delay in intervention is costly, as it later necessitates a longer transition phase with slow growth; and (iv) use of an exhaustible resource in dirty input production helps the switch to clean innovation under laissez-faire. (JEL O33, O44, Q30, Q54, Q56, Q58) PMID:26719595

  13. The Environment and Directed Technical Change.

    PubMed

    Acemoglu, Daron; Aghion, Philippe; Bursztyn, Leonardo; Hemous, David

    2012-02-01

    This paper introduces endogenous and directed technical change in a growth model with environmental constraints. The final good is produced from "dirty" and "clean" inputs. We show that: (i) when inputs are sufficiently substitutable, sustainable growth can be achieved with temporary taxes/subsidies that redirect innovation toward clean inputs; (ii) optimal policy involves both "carbon taxes" and research subsidies, avoiding excessive use of carbon taxes; (iii) delay in intervention is costly, as it later necessitates a longer transition phase with slow growth; and (iv) use of an exhaustible resource in dirty input production helps the switch to clean innovation under laissez-faire. (JEL O33, O44, Q30, Q54, Q56, Q58).

  14. Astro-geodetic platform for high accuracy geoid determinat ion

    NASA Astrophysics Data System (ADS)

    Bǎdescu, Octavian; Nedelcu, Dan Alin; Cǎlin, Alexandru; Dumitru, Paul Daniel; Cǎlin, Lavinia A.; Popescu, Marcel

    The paper presents first technical realizations of a mobile platform for vertical deviation determination at a satisfactory precision and low cost. The conception of the platform was made in the framework of a project regarding CCD astro-geodetic vertical deviation for geoid determination or geoid modeling. The project with the acronym A-GEO represents a collaboration between Technical University of Civil Engineering Bucharest - Faculty of Geodesy, (TUCEB-FG), Astronomical Institute of the Romanian academy (AIRA), and a private partner GeoGIS Proiect S.R.L. The paper presents some hardware and software aspects regarding design, development, and automation of the platform, based on an electro-optical geodetic instrument, CCD observations and satellite time synchronization for astro-geodetic measurements.

  15. Technical and economic aspects of the Intelsat system

    NASA Astrophysics Data System (ADS)

    Jefferis, A. K.

    1992-03-01

    The paper gives some background on the Intelsat system and explains the financial principles of the organization, which operates as a cost sharing cooperative. The members contribute both capital and operating costs in accordance with their use. The determination of the measure of 'use' in such a complex system requires a careful analysis of the factors which cause the cost. Most of these are technical, based on the use of satellite power, bandwidth and similar factors. Others reflect service related features such as priority, long-term commitment and market elasticity. This last element is only taken into account after ensuring that every service fully contributes the marginal cost of providing it.

  16. Comparing technical efficiency of farms with an automatic milking system and a conventional milking system.

    PubMed

    Steeneveld, W; Tauer, L W; Hogeveen, H; Oude Lansink, A G J M

    2012-12-01

    Changing from a conventional milking system (CMS) to an automatic milking system (AMS) necessitates a new management approach and a corresponding change in labor tasks. Together with labor savings, AMS farms have been found to have higher capital costs, primarily because of higher maintenance costs and depreciation. Therefore, it is hypothesized that AMS farms differ from CMS farms in capital:labor ratio and possibly their technical efficiency, at least during a transition learning period. The current study used actual farm accounting data from dairy farms in the Netherlands with an AMS and a CMS to investigate the empirical substitution of capital for labor in the AMS farms and to determine if the technical efficiency of the AMS farms differed from the CMS farms. The technical efficiency estimates were obtained with data envelopment analysis. The 63 AMS farms and the 337 CMS farms in the data set did not differ in general farm characteristics such as the number of cows, number of hectares, and the amount of milk quota. Farms with AMS have significantly higher capital costs (€12.71 per 100 kg of milk) than CMS farms (€10.10 per 100 kg of milk). Total labor costs and net outputs were not significantly different between AMS and CMS farms. A clear substitution of capital for labor with the adoption of an AMS could not be observed. Although the AMS farms have a slightly lower technical efficiency (0.76) than the CMS farms (0.78), a significant difference in these estimates was not observed. This indicates that the farms were not different in their ability to use inputs (capital, labor, cows, and land) to produce outputs (total farm revenues). The technical efficiency of farms invested in an AMS in 2008 or earlier was not different from the farms invested in 2009 or 2010, indicating that a learning effect during the transition period was not observed. The results indicate that the economic performance of AMS and CMS farms are similar. What these results show is that other than higher capital costs, the use of AMS rather than a CMS does not affect farm efficiency and that the learning costs to use an AMS are not present as measured by any fall in technical efficiency. Copyright © 2012 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  17. A model to determine payments associated with radiology procedures.

    PubMed

    Mabotuwana, Thusitha; Hall, Christopher S; Thomas, Shiby; Wald, Christoph

    2017-12-01

    Across the United States, there is a growing number of patients in Accountable Care Organizations and under risk contracts with commercial insurance. This is due to proliferation of new value-based payment models and care delivery reform efforts. In this context, the business model of radiology within a hospital or health system context is shifting from a primary profit-center to a cost-center with a goal of cost savings. Radiology departments need to increasingly understand how the transactional nature of the business relates to financial rewards. The main challenge with current reporting systems is that the information is presented only at an aggregated level, and often not broken down further, for instance, by type of exam. As such, the primary objective of this research is to provide better visibility into payments associated with individual radiology procedures in order to better calibrate expense/capital structure of the imaging enterprise to the actual revenue or value-add to the organization it belongs to. We propose a methodology that can be used to determine technical payments at a procedure level. We use a proportion based model to allocate payments to individual radiology procedures based on total charges (which also includes non-radiology related charges). Using a production dataset containing 424,250 radiology exams we calculated the overall average technical charge for Radiology to be $873.08 per procedure and the corresponding average payment to be $326.43 (range: $48.27 for XR and $2750.11 for PET/CT) resulting in an average payment percentage of 37.39% across all exams. We describe how charges associated with a procedure can be used to approximate technical payments at a more granular level with a focus on Radiology. The methodology is generalizable to approximate payment for other services as well. Understanding payments associated with each procedure can be useful during strategic practice planning. Charge-to-total charge ratio can be used to approximate radiology payments at a procedure level. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. 75 FR 61121 - Trade Adjustment Assistance for Farmers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... program, may apply for technical training and cash benefits by completing and submitting a written... technical assistance training under the program in order to be eligible for cash benefits. Producers.... After submitting a completed application, producers may receive technical assistance at no cost and cash...

  19. 75 FR 62760 - Trade Adjustment Assistance for Farmers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... assistance in FY 2011. Eligible individual blueberry producers in Maine may apply for technical training and..., producers may receive technical assistance at no cost and cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance training under the...

  20. Collaboration Strategies to Reduce Technical Debt

    ERIC Educational Resources Information Center

    Miko, Jeffrey Allen

    2017-01-01

    Inadequate software development collaboration processes can allow technical debt to accumulate increasing future maintenance costs and the chance of system failures. The purpose of this qualitative case study was to explore collaboration strategies software development leaders use to reduce the amount of technical debt created by software…

  1. Technical- and environmental-efficiency analysis of irrigated cotton-cropping systems in Punjab, Pakistan using data envelopment analysis.

    PubMed

    Ullah, Asmat; Perret, Sylvain R

    2014-08-01

    Cotton cropping in Pakistan uses substantial quantities of resources and adversely affects the environment with pollutants from the inputs, particularly pesticides. A question remains regarding to what extent the reduction of such environmental impact is possible without compromising the farmers' income. This paper investigates the environmental, technical, and economic performances of selected irrigated cotton-cropping systems in Punjab to quantify the sustainability of cotton farming and reveal options for improvement. Using mostly primary data, our study quantifies the technical, cost, and environmental efficiencies of different farm sizes. A set of indicators has been computed to reflect these three domains of efficiency using the data envelopment analysis technique. The results indicate that farmers are broadly environmentally inefficient; which primarily results from poor technical inefficiency. Based on an improved input mix, the average potential environmental impact reduction for small, medium, and large farms is 9, 13, and 11 %, respectively, without compromising the economic return. Moreover, the differences in technical, cost, and environmental efficiencies between small and medium and small and large farm sizes were statistically significant. The second-stage regression analysis identifies that the entire farm size significantly affects the efficiencies, whereas exposure to extension and training has positive effects, and the sowing methods significantly affect the technical and environmental efficiencies. Paradoxically, the formal education level is determined to affect the efficiencies negatively. This paper discusses policy interventions that can improve the technical efficiency to ultimately increase the environmental efficiency and reduce the farmers' operating costs.

  2. Optimization and life-cycle cost of health clinic PV system for a rural area in southern Iraq using HOMER software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Karaghouli, Ali; Kazmerski, L.L.

    2010-04-15

    This paper addresses the need for electricity of rural areas in southern Iraq and proposes a photovoltaic (PV) solar system to power a health clinic in that region. The total daily health clinic load is 31.6 kW h and detailed loads are listed. The National Renewable Energy Laboratory (NREL) optimization computer model for distributed power, ''HOMER,'' is used to estimate the system size and its life-cycle cost. The analysis shows that the optimal system's initial cost, net present cost, and electricity cost is US$ 50,700, US$ 60,375, and US$ 0.238/kW h, respectively. These values for the PV system are comparedmore » with those of a generator alone used to supply the load. We found that the initial cost, net present cost of the generator system, and electricity cost are US$ 4500, US$ 352,303, and US$ 1.332/kW h, respectively. We conclude that using the PV system is justified on humanitarian, technical, and economic grounds. (author)« less

  3. A Planning Study for the Conversion of Recorded Books and Magazines from Rigid Discs to Cassettes and Flexible Discs. Final Report.

    ERIC Educational Resources Information Center

    Innovative Systems Research, Inc., Pennsauken, NJ.

    Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…

  4. An Examination of the Benefits and Costs of Sabbatical Leave for General Higher Education, Industry, and Professional-Technical/Community College Environments

    ERIC Educational Resources Information Center

    Otto, Linda R.; Kroth, Michael

    2011-01-01

    The purpose of this literature review is to examine the differences in the use of sabbatical leave among the arenas of general higher education, industry, and professional-technical/community college. The purposes and policies applied to sabbatical leave, along with the cost of using sabbatical leave in these three environments are compared and…

  5. Replacement model of city bus: A dynamic programming approach

    NASA Astrophysics Data System (ADS)

    Arifin, Dadang; Yusuf, Edhi

    2017-06-01

    This paper aims to develop a replacement model of city bus vehicles operated in Bandung City. This study is driven from real cases encountered by the Damri Company in the efforts to improve services to the public. The replacement model propounds two policy alternatives: First, to maintain or keep the vehicles, and second is to replace them with new ones taking into account operating costs, revenue, salvage value, and acquisition cost of a new vehicle. A deterministic dynamic programming approach is used to solve the model. The optimization process was heuristically executed using empirical data of Perum Damri. The output of the model is to determine the replacement schedule and the best policy if the vehicle has passed the economic life. Based on the results, the technical life of the bus is approximately 20 years old, while the economic life is an average of 9 (nine) years. It means that after the bus is operated for 9 (nine) years, managers should consider the policy of rejuvenation.

  6. Development of a NASA Integrated Technical Workforce Career Development Model Entitled Requisite Occupation Competencies and Knowledge -- the ROCK

    NASA Technical Reports Server (NTRS)

    Menrad, Robert J.; Larson, Wiley J.

    2008-01-01

    This paper shares the findings of NASA's Integrated Learning and Development Program (ILDP) in its effort to reinvigorate the HANDS-ON practice of space systems engineering and project/program management through focused coursework, training opportunities, on-the job learning and special assignments. Prior to March 2005, NASA responsibility for technical workforce development (the program/project manager, systems engineering, discipline engineering, discipline engineering and associated communities) was executed by two parallel organizations. In March 2005 these organizations merged. The resulting program-ILDP-was chartered to implement an integrated competency-based development model capable of enhancing NASA's technical workforce performance as they face the complex challenges of Earth science, space science, aeronautics and human spaceflight missions. Results developed in collaboration with NASA Field Centers are reported on. This work led to definition of the agency's first integrated technical workforce development model known as the Requisite Occupation Competence and Knowledge (the ROCK). Critical processes and products are presented including: 'validation' techniques to guide model development, the Design-A-CUrriculuM (DACUM) process, and creation of the agency's first systems engineering body-of-knowledge. Findings were validated via nine focus groups from industry and government, validated with over 17 space-related organizations, at an estimated cost exceeding $300,000 (US). Masters-level programs and training programs have evolved to address the needs of these practitioner communities based upon these results. The ROCK reintroduced rigor and depth to the practitioner's development in these critical disciplines enabling their ability to take mission concepts from imagination to reality.

  7. The Aviation System Analysis Capability Air Carrier Cost-Benefit Model

    NASA Technical Reports Server (NTRS)

    Gaier, Eric M.; Edlich, Alexander; Santmire, Tara S.; Wingrove, Earl R.., III

    1999-01-01

    To meet its objective of assisting the U.S. aviation industry with the technological challenges of the future, NASA must identify research areas that have the greatest potential for improving the operation of the air transportation system. Therefore, NASA is developing the ability to evaluate the potential impact of various advanced technologies. By thoroughly understanding the economic impact of advanced aviation technologies and by evaluating how the new technologies will be used in the integrated aviation system, NASA aims to balance its aeronautical research program and help speed the introduction of high-leverage technologies. To meet these objectives, NASA is building the Aviation System Analysis Capability (ASAC). NASA envisions ASAC primarily as a process for understanding and evaluating the impact of advanced aviation technologies on the U.S. economy. ASAC consists of a diverse collection of models and databases used by analysts and other individuals from the public and private sectors brought together to work on issues of common interest to organizations in the aviation community. ASAC also will be a resource available to the aviation community to analyze; inform; and assist scientists, engineers, analysts, and program managers in their daily work. The ASAC differs from previous NASA modeling efforts in that the economic behavior of buyers and sellers in the air transportation and aviation industries is central to its conception. Commercial air carriers, in particular, are an important stakeholder in this community. Therefore, to fully evaluate the implications of advanced aviation technologies, ASAC requires a flexible financial analysis tool that credibly links the technology of flight with the financial performance of commercial air carriers. By linking technical and financial information, NASA ensures that its technology programs will continue to benefit the user community. In addition, the analysis tool must be capable of being incorporated into the wide-ranging suite of economic and technical models that comprise ASAC. This report describes an Air Carrier Cost-Benefit Model (CBM) that meets these requirements. The ASAC CBM is distinguished from many of the aviation cost-benefit models by its exclusive focus on commercial air carriers. The model considers such benefit categories as time and fuel savings, utilization opportunities, reliability and capacity enhancements, and safety and security improvements. The model distinguishes between benefits that are predictable and those that occur randomly. By making such a distinction, the model captures the ability of air carriers to reoptimize scheduling and crew assignments for predictable benefits. In addition, the model incorporates a life-cycle cost module for new technology, which applies the costs of nonrecurring acquisitions, recurring maintenance and operation, and training to each aircraft equipment type independently.

  8. Changes in DSTO Support to Projects Arising From the 6th July 2006 DCIC Decision: Updated Guidance for Project S&T Plans

    DTIC Science & Technology

    2007-02-01

    responsible to the Government for certifying these technical risks [4] and [5] The current funding model for Project S&T Plans is: • Pre-First...the new costing spreadsheets at Annexes C-E. 3.1 A complete set of S&T Activities The 6th July 2006 DCIC decisions to change the funding model increase...changes to the funding model mean that the set of S&T Activities in the Project S&T Plans will need to be categorised in new ways to fit in with the

  9. Boiler MACT Technical Assistance (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-03-01

    Fact sheet describing the changes to Environmental Protection Act process standards. The DOE will offer technical assistance to ensure that major sources burning coal and oil have information on cost-effective, clean energy strategies for compliance, and to promote cleaner, more efficient boiler burning to cut harmful pollution and reduce operational costs. The U.S. Environmental Protection Agency (EPA) is expected to finalize the reconsideration process for its Clean Air Act pollution standards National Emissions Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters (known as Boiler Maximum Achievable Control Technology (MACT)), in Spring 2012.more » This rule applies to large and small boilers in a wide range of industrial facilities and institutions. The U.S. Department of Energy (DOE) will offer technical assistance to ensure that major sources burning coal or oil have information on cost-effective clean energy strategies for compliance, including combined heat and power, and to promote cleaner, more efficient boilers to cut harmful pollution and reduce operational costs.« less

  10. Rolling scheduling of electric power system with wind power based on improved NNIA algorithm

    NASA Astrophysics Data System (ADS)

    Xu, Q. S.; Luo, C. J.; Yang, D. J.; Fan, Y. H.; Sang, Z. X.; Lei, H.

    2017-11-01

    This paper puts forth a rolling modification strategy for day-ahead scheduling of electric power system with wind power, which takes the operation cost increment of unit and curtailed wind power of power grid as double modification functions. Additionally, an improved Nondominated Neighbor Immune Algorithm (NNIA) is proposed for solution. The proposed rolling scheduling model has further improved the operation cost of system in the intra-day generation process, enhanced the system’s accommodation capacity of wind power, and modified the key transmission section power flow in a rolling manner to satisfy the security constraint of power grid. The improved NNIA algorithm has defined an antibody preference relation model based on equal incremental rate, regulation deviation constraints and maximum & minimum technical outputs of units. The model can noticeably guide the direction of antibody evolution, and significantly speed up the process of algorithm convergence to final solution, and enhance the local search capability.

  11. 7 CFR 1709.110 - Use of grant funds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... help establish the financial and technical sustainability of the project, provided that such costs do not exceed more than 10 percent of total project costs; (2) Design and engineering costs, including...

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Biddy, Mary J.; Davis, Ryan; Humbird, David

    Biorefinery process development relies on techno-economic analysis (TEA) to identify primary cost drivers, prioritize research directions, and mitigate technical risk for scale-up through development of detailed process designs. Here, we conduct TEA of a model 2000 dry metric ton-per-day lignocellulosic biorefinery that employs a two-step pretreatment and enzymatic hydrolysis to produce biomass-derived sugars, followed by biological lipid production, lipid recovery, and catalytic hydrotreating to produce renewable diesel blendstock (RDB). On the basis of projected near-term technical feasibility of these steps, we predict that RDB could be produced at a minimum fuel selling price (MFSP) of USD $9.55/gasoline-gallon-equivalent (GGE), predicated onmore » the need for improvements in the lipid productivity and yield beyond current benchmark performance. This cost is significant given the limitations in scale and high costs for aerobic cultivation of oleaginous microbes and subsequent lipid extraction/recovery. In light of this predicted cost, we developed an alternative pathway which demonstrates that RDB costs could be substantially reduced in the near term if upgradeable fractions of biomass, in this case hemicellulose-derived sugars, are diverted to coproducts of sufficient value and market size; here, we use succinic acid as an example coproduct. The coproduction model predicts an MFSP of USD $5.28/GGE when leaving conversion and yield parameters unchanged for the fuel production pathway, leading to a change in biorefinery RDB capacity from 24 to 15 MM GGE/year and 0.13 MM tons of succinic acid per year. Additional analysis demonstrates that beyond the near-term projections assumed in the models here, further reductions in the MFSP toward $2-3/GGE (which would be competitive with fossil-based hydrocarbon fuels) are possible with additional transformational improvements in the fuel and coproduct trains, especially in terms of carbon efficiency to both fuels and coproducts, recovery and purification of fuels and coproducts, and coproduct selection and price. Overall, this analysis documents potential economics for both a hydrocarbon fuel and bioproduct process pathway and highlights prioritized research directions beyond the current benchmark to enable hydrocarbon fuel production via an oleaginous microbial platform with simultaneous coproduct manufacturing from lignocellulosic biomass.« less

  13. Theoretical approaches to creation of robotic coal mines based on the synthesis of simulation technologies

    NASA Astrophysics Data System (ADS)

    Fryanov, V. N.; Pavlova, L. D.; Temlyantsev, M. V.

    2017-09-01

    Methodological approaches to theoretical substantiation of the structure and parameters of robotic coal mines are outlined. The results of mathematical and numerical modeling revealed the features of manifestation of geomechanical and gas dynamic processes in the conditions of robotic mines. Technological solutions for the design and manufacture of technical means for robotic mine are adopted using the method of economic and mathematical modeling and in accordance with the current regulatory documents. For a comparative performance evaluation of technological schemes of traditional and robotic mines, methods of cognitive modeling and matrix search for subsystem elements in the synthesis of a complex geotechnological system are applied. It is substantiated that the process of technical re-equipment of a traditional mine with a phased transition to a robotic mine will reduce unit costs by almost 1.5 times with a significant social effect due to a reduction in the number of personnel engaged in hazardous work.

  14. Methods and Costs to Achieve Ultra Reliable Life Support

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2012-01-01

    A published Mars mission is used to explore the methods and costs to achieve ultra reliable life support. The Mars mission and its recycling life support design are described. The life support systems were made triply redundant, implying that each individual system will have fairly good reliability. Ultra reliable life support is needed for Mars and other long, distant missions. Current systems apparently have insufficient reliability. The life cycle cost of the Mars life support system is estimated. Reliability can be increased by improving the intrinsic system reliability, adding spare parts, or by providing technically diverse redundant systems. The costs of these approaches are estimated. Adding spares is least costly but may be defeated by common cause failures. Using two technically diverse systems is effective but doubles the life cycle cost. Achieving ultra reliability is worth its high cost because the penalty for failure is very high.

  15. 75 FR 41432 - Trade Adjustment Assistance for Farmers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... interested in applying for technical training and cash benefits must complete and submit a written..., 2010. After submitting a completed application, producers may receive technical assistance at no cost.... Applicants must complete the technical assistance under the program in order to be eligible for cash benefits...

  16. 48 CFR 2415.305 - Proposal evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical portion of each proposal to the TEP Chairperson or his or her designee. The cost/price portion of each proposal shall be retained by the Contracting Officer pending initial technical evaluation by the TEP. (3) Technical evaluation. The TEP shall rate each proposal based on the evaluation factors...

  17. 76 FR 60478 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Department...: The Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) was established under section 807 of... Gas Supply on Fuel Cell and Hydrogen Market. Industry Presentations. Status Cost and Performance of...

  18. 24 CFR 570.402 - Technical assistance awards.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... CFR part 571); and the Special Purpose Grants for Insular Areas, Community Development Work Study and... attended by more than one unit of government. (d) Eligible activities. Activities eligible for technical.... Activities for which costs are ineligible under this section include: (1) In the case of technical assistance...

  19. 24 CFR 570.402 - Technical assistance awards.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... CFR part 571); and the Special Purpose Grants for Insular Areas, Community Development Work Study and... attended by more than one unit of government. (d) Eligible activities. Activities eligible for technical.... Activities for which costs are ineligible under this section include: (1) In the case of technical assistance...

  20. Astronomical Book Trek: Astronomy Books of 1983.

    ERIC Educational Resources Information Center

    Fraknoi, Andrew

    1984-01-01

    Presents an annotated list of technical and non-technical astronomy books. Topic areas of non-technical books include general astronomy, amateur astronomy, computers and astronomy, history of astronomy, pseudoscience, space exploration, physics and astronomy, and textbooks. Each entry includes author, title, description, source, and current cost.…

  1. Teaching communication and supporting autonomy with a team-based operative simulator.

    PubMed

    Cook, Mackenzie R; Deal, Shanley B; Scott, Jessica M; Moren, Alexis M; Kiraly, Laszlo N

    2016-09-01

    Changing residency structure emphasizes the need for formal instruction on team leadership and intraoperative teaching skills. A high fidelity, multi-learner surgical simulation may offer opportunities for senior learners (SLs) to learn these skills while teaching technical skills to junior learners (JLs). We designed and optimized a low-cost inguinal hernia model that paired JLs and SLs as an operative team. This was tested in 3 pilot simulations. Participants' feedback was analyzed using qualitative methods. JL feedback to SLs included the themes "guiding and instructing" and "allowing autonomy." Senior Learner feedback to JLs focused on "mechanics," "knowledge," and "perspective/flow." Both groups focused on "communication" and "professionalism." A multi-learner simulation can successfully meet the technical learning needs of JLs and the teaching and communication learning needs of SLs. This model of resident-driven simulation may illustrate future opportunities for operative simulation. Copyright © 2016 Elsevier Inc. All rights reserved.

  2. Defining and using open architecture levels

    NASA Astrophysics Data System (ADS)

    Cramer, M. A.; Morrison, A. W.; Cordes, B.; Stack, J. R.

    2012-05-01

    Open architecture (OA) within military systems enables delivery of increased warfighter capabilities in a shorter time at a reduced cost.i In fact in today's standards-aware environment, solutions are often proposed to the government that include OA as one of its basics design tenets. Yet the ability to measure and assess OA in an objective manner, particularly at the subsystem/component level within a system, remains an elusive proposition. Furthermore, it is increasingly apparent that the establishment of an innovation ecosystem of an open business model that leverages thirdparty development requires more than just technical modifications that promote openness. This paper proposes a framework to migrate not only towards technical openness, but also towards enabling and facilitating an open business model, driven by third party development, for military systems. This framework was developed originally for the U.S. Navy Littoral and Mine Warfare community; however, the principles and approach may be applied elsewhere within the Navy and Department of Defense.

  3. Development of cost-effective surfactant flooding technology, Quarterly report, October 1995--December 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pope, G.A.; Sepehrnoori, K.

    1995-12-31

    The objective of this research is to develop cost-effective surfactant flooding technology by using simulation studies to evaluate and optimize alternative design strategies taking into account reservoir characteristics process chemistry, and process design options such as horizontal wells. Task 1 is the development of an improved numerical method for our simulator that will enable us to solve a wider class of these difficult simulation problems accurately and affordably. Task 2 is the application of this simulator to the optimization of surfactant flooding to reduce its risk and cost. In this quarter, we have continued working on Task 2 to optimizemore » surfactant flooding design and have included economic analysis to the optimization process. An economic model was developed using a spreadsheet and the discounted cash flow (DCF) method of economic analysis. The model was designed specifically for a domestic onshore surfactant flood and has been used to economically evaluate previous work that used a technical approach to optimization. The DCF model outputs common economic decision making criteria, such as net present value (NPV), internal rate of return (IRR), and payback period.« less

  4. Endoscopic resection is cost-effective compared with laparoscopic resection in the management of complex colon polyps: an economic analysis.

    PubMed

    Law, Ryan; Das, Ananya; Gregory, Dyanna; Komanduri, Srinadh; Muthusamy, Raman; Rastogi, Amit; Vargo, John; Wallace, Michael B; Raju, G S; Mounzer, Rawad; Klapman, Jason; Shah, Janak; Watson, Rabindra; Wilson, Robert; Edmundowicz, Steven A; Wani, Sachin

    2016-06-01

    Endoscopic resection (ER) is an efficacious treatment for complex colon polyps (CCPs). Many patients are referred for surgical resection because of concerns over procedural safety, incomplete polyp resection, and adenoma recurrence after ER. Efficacy data for both resection strategies are widely available, but a paucity of data exist on the cost-effectiveness of each modality. The aim of this study was to perform an economic analysis comparing ER and laparoscopic resection (LR) strategies in patients with CCP. A decision analysis tree was constructed using decision analysis software. The 2 strategies (ER vs LR) were evaluated in a hypothetical cohort of patients with CCPs. A hybrid Markov model with a 10-year time horizon was used. Patients entered the model after colonoscopic diagnosis at age 50. Under Strategy I, patients underwent ER followed by surveillance colonoscopy at 3 to 6 months and 12 months. Patients with failed ER and residual adenoma at 12 months were referred for LR. Under Strategy II, patients underwent LR as primary treatment. Patients with invasive cancer were excluded. Estimates regarding ER performance characteristics were obtained from a systematic review of published literature. The Centers for Medicare & Medicaid Services (2012-2013) and the 2012 Healthcare Cost and Utilization Project databases were used to determine the costs and loss of utility. We assumed that all procedures were performed with anesthesia support, and patients with adverse events in both strategies required inpatient hospitalization. Baseline estimates and costs were varied by using a sensitivity analysis through the ranges. LR was found to be more costly and yielded fewer quality-adjusted life-years (QALYs) compared with ER. The cost of ER of a CCP was $5570 per patient and yielded 9.640 QALYs. LR of a CCP cost $18,717 per patient and yielded fewer QALYs (9.577). For LR to be more cost-effective, the thresholds of 1-way sensitivity analyses were (1) technical success of ER for complete resection in <75.8% of cases, (2) adverse event rates for ER > 12%, and (3) LR cost of <$14,000. Our data suggest that ER is a cost-effective strategy for removal of CCPs. The effectiveness is driven by high technical success and low adverse event rates associated with ER, in addition to the increased cost of LR. Copyright © 2016 American Society for Gastrointestinal Endoscopy. Published by Elsevier Inc. All rights reserved.

  5. Review of hardware cost estimation methods, models and tools applied to early phases of space mission planning

    NASA Astrophysics Data System (ADS)

    Trivailo, O.; Sippel, M.; Şekercioğlu, Y. A.

    2012-08-01

    The primary purpose of this paper is to review currently existing cost estimation methods, models, tools and resources applicable to the space sector. While key space sector methods are outlined, a specific focus is placed on hardware cost estimation on a system level, particularly for early mission phases during which specifications and requirements are not yet crystallised, and information is limited. For the space industry, cost engineering within the systems engineering framework is an integral discipline. The cost of any space program now constitutes a stringent design criterion, which must be considered and carefully controlled during the entire program life cycle. A first step to any program budget is a representative cost estimate which usually hinges on a particular estimation approach, or methodology. Therefore appropriate selection of specific cost models, methods and tools is paramount, a difficult task given the highly variable nature, scope as well as scientific and technical requirements applicable to each program. Numerous methods, models and tools exist. However new ways are needed to address very early, pre-Phase 0 cost estimation during the initial program research and establishment phase when system specifications are limited, but the available research budget needs to be established and defined. Due to their specificity, for vehicles such as reusable launchers with a manned capability, a lack of historical data implies that using either the classic heuristic approach such as parametric cost estimation based on underlying CERs, or the analogy approach, is therefore, by definition, limited. This review identifies prominent cost estimation models applied to the space sector, and their underlying cost driving parameters and factors. Strengths, weaknesses, and suitability to specific mission types and classes are also highlighted. Current approaches which strategically amalgamate various cost estimation strategies both for formulation and validation of an estimate, and techniques and/or methods to attain representative and justifiable cost estimates are consequently discussed. Ultimately, the aim of the paper is to establish a baseline for development of a non-commercial, low cost, transparent cost estimation methodology to be applied during very early program research phases at a complete vehicle system level, for largely unprecedented manned launch vehicles in the future. This paper takes the first step to achieving this through the identification, analysis and understanding of established, existing techniques, models, tools and resources relevant within the space sector.

  6. The cost of doing business: cost structure of electronic immunization registries.

    PubMed

    Fontanesi, John M; Flesher, Don S; De Guire, Michelle; Lieberthal, Allan; Holcomb, Kathy

    2002-10-01

    To predict the true cost of developing and maintaining an electronic immunization registry, and to set the framework for developing future cost-effective and cost-benefit analysis. Primary data collected at three immunization registries located in California, accounting for 90 percent of all immunization records in registries in the state during the study period. A parametric cost analysis compared registry development and maintenance expenditures to registry performance requirements. Data were collected at each registry through interviews, reviews of expenditure records, technical accomplishments development schedules, and immunization coverage rates. The cost of building immunization registries is predictable and independent of the hardware/software combination employed. The effort requires four man-years of technical effort or approximately $250,000 in 1998 dollars. Costs for maintaining a registry were approximately $5,100 per end user per three-year period. There is a predictable cost structure for both developing and maintaining immunization registries. The cost structure can be used as a framework for examining the cost-effectiveness and cost-benefits of registries. The greatest factor effecting improvement in coverage rates was ongoing, user-based administrative investment.

  7. Technical assistance for law-enforcement communications: Case study report two

    NASA Technical Reports Server (NTRS)

    Reilly, N. B.; Mustain, J. A.

    1979-01-01

    Two case histories are presented. In one study the feasibility of consolidating dispatch center operations for small agencies is considered. System load measurements were taken and queueing analysis applied to determine numbers of personnel required for each separate agency and for a consolidated dispatch center. Functional requirements were developed and a cost model was designed to compare relative costs of various alternatives including continuation of the present system, consolidation of a manual system, and consolidated computer-aided dispatching. The second case history deals with the consideration of a multi-regional, intrastate radio frequency for improved interregional communications. Sample standards and specifications for radio equipment are provided.

  8. Integrating O/S models during conceptual design, part 2

    NASA Technical Reports Server (NTRS)

    Ebeling, Charles E.

    1994-01-01

    This report documents the procedures for utilizing and maintaining the Reliability & Maintainability Model (RAM) developed by the University of Dayton for the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) under NASA research grant NAG-1-1327. The purpose of the grant is to provide support to NASA in establishing operational and support parameters and costs of proposed space systems. As part of this research objective, the model described here was developed. Additional documentation concerning the development of this model may be found in Part 1 of this report. This is the 2nd part of a 3 part technical report.

  9. Application of System Operational Effectiveness Methodology to Space Launch Vehicle Development and Operations

    NASA Technical Reports Server (NTRS)

    Watson, Michael D.; Kelley, Gary W.

    2012-01-01

    The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.

  10. An Introduction to the NCHEMS Costing and Data Management System. Technical Report No. 55.

    ERIC Educational Resources Information Center

    Haight, Mike; Martin, Ron

    The NCHEMS Costing and Data Management System is designed to assist institutions in the implementation of cost studies. There are at least two kinds of cost studies: historical cost studies which display cost-related data that reflect actual events over a specific prior time period, and predictive cost studies which forecast costs that will be…

  11. Heuristics and Biases in Military Decision Making

    DTIC Science & Technology

    2010-10-01

    rationality and is based on a linear, step-based model that generates a specific course of action and is useful for the examination of problems that...exhibit stability and are underpinned by assumptions of “technical- rationality .”5 The Army values MDMP as the sanctioned approach for solving...theory) which sought to describe human behavior as a rational maximization of cost-benefit decisions, Kahne- man and Tversky provided a simple

  12. Briefing Materials for Technical Presentations, Volume B: The LACIE Symposium

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Tables, charts, and LACIE segments are used to demonstrate the accuracy of estimated crop conditions and yield from 1974 to 1976, and to demonstrate the benefits of meteorological and LANDSAT data. Developments in data acquisition, sampling, and reduction are reviewed. The USDA application test system is highlighted with emphasis on user requirements, technology transfer, data base design, and cost data models for data base operation and management.

  13. Monitoring and Controlling Engineering and Construction Management Cost Performance Within the Corps of Engineers

    DTIC Science & Technology

    1988-12-01

    COST MANAGEMENT The CMIF approach addresses total costs but does not permit the analysis of indirect costs. We found that indirect costs vary...responsibility USACE/divisions Increasing CMIF Districts/divisions level of by fund type detail G&A, technical indirect, burden Districts by fund type

  14. Learning and forgetting in the jet fighter aircraft industry.

    PubMed

    Bongers, Anelí

    2017-01-01

    A recent strategy carried out by the aircraft industry to reduce the total cost of the new generation fighters has consisted in the development of a single airframe with different technical and operational specifications. This strategy has been designed to reduce costs in the Research, Design and Development phase with the ultimate objective of reducing the final unit price per aircraft. This is the case of the F-35 Lightning II, where three versions, with significant differences among them, are produced simultaneously based on a single airframe. Whereas this strategy seems to be useful to cut down pre-production sunk costs, their effects on production costs remain to be studied. This paper shows that this strategy can imply larger costs in the production phase by reducing learning acquisition and hence, the total effect on the final unit price of the aircraft is indeterminate. Learning curves are estimated based on the flyaway cost for the latest three fighter aircraft models: The A/F-18E/F Super Hornet, the F-22A Raptor, and the F-35A Lightning II. We find that learning rates for the F-35A are significantly lower (an estimated learning rate of around 9%) than for the other two models (around 14%).

  15. Learning and forgetting in the jet fighter aircraft industry

    PubMed Central

    2017-01-01

    A recent strategy carried out by the aircraft industry to reduce the total cost of the new generation fighters has consisted in the development of a single airframe with different technical and operational specifications. This strategy has been designed to reduce costs in the Research, Design and Development phase with the ultimate objective of reducing the final unit price per aircraft. This is the case of the F-35 Lightning II, where three versions, with significant differences among them, are produced simultaneously based on a single airframe. Whereas this strategy seems to be useful to cut down pre-production sunk costs, their effects on production costs remain to be studied. This paper shows that this strategy can imply larger costs in the production phase by reducing learning acquisition and hence, the total effect on the final unit price of the aircraft is indeterminate. Learning curves are estimated based on the flyaway cost for the latest three fighter aircraft models: The A/F-18E/F Super Hornet, the F-22A Raptor, and the F-35A Lightning II. We find that learning rates for the F-35A are significantly lower (an estimated learning rate of around 9%) than for the other two models (around 14%). PMID:28957359

  16. NASA's X-Plane Database and Parametric Cost Model v 2.0

    NASA Technical Reports Server (NTRS)

    Sterk, Steve; Ogluin, Anthony; Greenberg, Marc

    2016-01-01

    The NASA Armstrong Cost Engineering Team with technical assistance from NASA HQ (SID)has gone through the full process in developing new CERs from Version #1 to Version #2 CERs. We took a step backward and reexamined all of the data collected, such as dependent and independent variables, cost, dry weight, length, wingspan, manned versus unmanned, altitude, Mach number, thrust, and skin. We used a well- known statistical analysis tool called CO$TAT instead of using "R" multiple linear or the "Regression" tool found in Microsoft Excel(TradeMark). We setup an "array of data" by adding 21" dummy variables;" we analyzed the standard error (SE) and then determined the "best fit." We have parametrically priced-out several future X-planes and compared our results to those of other resources. More work needs to be done in getting "accurate and traceable cost data" from historical X-plane records!

  17. Technical Assistance Information Centers and Consultants.

    ERIC Educational Resources Information Center

    National Arts and the Handicapped Information Service, New York, NY.

    Three types of resources for planners of programs for the arts and/or the handicapped are indicated in this directory: technical assistance, information services, and consultants. In this context, technical assistance is defined as free or low cost professional advisory service provided by telephone, mail, or personal visits. Resources listed…

  18. 34 CFR 403.187 - How may a State provide technical assistance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION... Adult Vocational Education Program to pay the costs of providing technical assistance. (c) In providing... 34 Education 3 2014-07-01 2014-07-01 false How may a State provide technical assistance? 403.187...

  19. 34 CFR 403.187 - How may a State provide technical assistance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION... Adult Vocational Education Program to pay the costs of providing technical assistance. (c) In providing... 34 Education 3 2013-07-01 2013-07-01 false How may a State provide technical assistance? 403.187...

  20. 34 CFR 403.187 - How may a State provide technical assistance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION... Adult Vocational Education Program to pay the costs of providing technical assistance. (c) In providing... 34 Education 3 2012-07-01 2012-07-01 false How may a State provide technical assistance? 403.187...

  1. 34 CFR 403.187 - How may a State provide technical assistance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION... Adult Vocational Education Program to pay the costs of providing technical assistance. (c) In providing... 34 Education 3 2011-07-01 2011-07-01 false How may a State provide technical assistance? 403.187...

  2. Enzymatic corn wet milling: engineering process and cost model

    PubMed Central

    Ramírez, Edna C; Johnston, David B; McAloon, Andrew J; Singh, Vijay

    2009-01-01

    Background Enzymatic corn wet milling (E-milling) is a process derived from conventional wet milling for the recovery and purification of starch and co-products using proteases to eliminate the need for sulfites and decrease the steeping time. In 2006, the total starch production in USA by conventional wet milling equaled 23 billion kilograms, including modified starches and starches used for sweeteners and ethanol production [1]. Process engineering and cost models for an E-milling process have been developed for a processing plant with a capacity of 2.54 million kg of corn per day (100,000 bu/day). These models are based on the previously published models for a traditional wet milling plant with the same capacity. The E-milling process includes grain cleaning, pretreatment, enzymatic treatment, germ separation and recovery, fiber separation and recovery, gluten separation and recovery and starch separation. Information for the development of the conventional models was obtained from a variety of technical sources including commercial wet milling companies, industry experts and equipment suppliers. Additional information for the present models was obtained from our own experience with the development of the E-milling process and trials in the laboratory and at the pilot plant scale. The models were developed using process and cost simulation software (SuperPro Designer®) and include processing information such as composition and flow rates of the various process streams, descriptions of the various unit operations and detailed breakdowns of the operating and capital cost of the facility. Results Based on the information from the model, we can estimate the cost of production per kilogram of starch using the input prices for corn, enzyme and other wet milling co-products. The work presented here describes the E-milling process and compares the process, the operation and costs with the conventional process. Conclusion The E-milling process was found to be cost competitive with the conventional process during periods of high corn feedstock costs since the enzymatic process enhances the yields of the products in a corn wet milling process. This model is available upon request from the authors for educational, research and non-commercial uses. PMID:19154623

  3. Standard Terms and Conditions | NREL

    Science.gov Websites

    and Technical Services Subcontracts, Cost-Type (1) Cost Sharing (2) Cost Reimbursement (3) Cost Plus Than Foreign) (1) Cost Sharing (2) Cost Reimbursement (2) Cost Plus Fixed Fee. Appendix B-10 (12/15/16 /15/16) Standard Terms and Conditions for Travel Requirements (1) Cost Sharing (2) Cost Reimbursement

  4. Studying the Cost and Value of Library Services: Final Report. Technical Report APLAB/94-3/1,2,3,4.

    ERIC Educational Resources Information Center

    Kantor, Paul B.; And Others

    This is the final technical report (in three parts) of a 15-month long project to study the costs and value of library functions at five major research libraries. Twenty-one services or service aspects were studied, and numerous measures of the importance or benefit of the service to the users were made. These measures were studied together to lay…

  5. Educational Costs in Technical and Professional Fields of Study. A Report to the Legislature in Response to Assembly Concurrent Resolution 38 (Chapter 50 of the Statutes of 1986). Commission Report 87-21.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    Relative costs in specialized occupational fields of study at the California State University and the University of California are evaluated by the California Postsecondary Education Commission. Procedures used by the universities to allocate resources among various technical and specialized fields of study are described. The analysis indicates…

  6. Spent nuclear fuel canister storage building conceptual design report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swenson, C.E.

    This Conceptual Design Report provides the technical basis for the Spent Nuclear Fuels Project, Canister Storage Building, and as amended by letter (correspondence number 9555700, M.E. Witherspoon to E.B. Sellers, ``Technical Baseline and Updated Cost Estimate for the Canister Storage Building``, dated October 24, 1995), includes the project cost baseline and Criteria to be used as the basis for starting detailed design in fiscal year 1995.

  7. Distributed photovoltaic system impact upon utility load/supply management practices

    NASA Astrophysics Data System (ADS)

    Vachtsevanos, G. J.; Meliopoulos, A. P.; Paraskevopoulos, B. K.

    A methodology is described for simulation of the economic and technical factors of photovoltaic (PV) installations interfacing with utility load/management operations. A probabalistic technique is used to model the expected demand, reliability of the generating units, costs and profits from each unit, expected unserviced energy, and the loss of load probability. The available power from PV arrays is treated stochastically with statistical weighting on the basis of site meteorological data. The goal is to include the PV power while minimizing operational costs, taking into account the level of penetration of the total PV output. Two sample simulations for a utility with a diverse generating mix demonstrate that overall costs would decrease in both cases with PVs on-line through the emphasis on cheaper-fueled generators and peak-load shaving when possible.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rhinefrank, Kenneth; Lamb, Bradford; Prudell, Joseph

    This Project aims to satisfy objectives of the DOE’s Water Power Program by completing a system detailed design (SDD) and other important activities in the first phase of a utility-scale grid-connected ocean wave energy demonstration. In early 2012, Columbia Power (CPwr) had determined that further cost and performance optimization was necessary in order to commercialize its StingRAY wave energy converter (WEC). CPwr’s progress toward commercialization, and the requisite technology development path, were focused on transitioning toward a commercial-scale demonstration. This path required significant investment to be successful, and the justification for this investment required improved annual energy production (AEP) andmore » lower capital costs. Engineering solutions were developed to address these technical and cost challenges, incorporated into a proposal to the US Department of Energy (DOE), and then adapted to form the technical content and statement of project objectives of the resulting Project (DE-EE0005930). Through Project cost-sharing and technical collaboration between DOE and CPwr, and technical collaboration with Oregon State University (OSU), National Renewable Energy Lab (NREL) and other Project partners, we have demonstrated experimentally that these conceptual improvements have merit and made significant progress towards a certified WEC system design at a selected and contracted deployment site at the Wave Energy Test Site (WETS) at the Marine Corps Base in Oahu, HI (MCBH).« less

  9. A generalized analysis of solar space heating in the United States

    NASA Astrophysics Data System (ADS)

    Clark, J. A.

    A life-cycle model is developed for solar space heating within the United States that is based on the solar design data from the Los Alamos Scientific Laboratory. The model consists of an analytical relationship among five dimensionless parameters that include all pertinent technical, climatological, solar, operating and economic factors that influence the performance of a Solar Space Heating System. An important optimum condition presented is the 'Breakeven' metered cost of conventional fuel at which the cost of the solar system is equal to that of a conventional heating system. The effect of Federal (1980) and State (1979) income tax credits on these costs is determined. A parameter that includes both solar availability and solar system utilization is derived and plotted on a map of the U.S. This parameter shows the most favorable present locations for solar space heating application to be in the Central and Mountain States. The data employed are related to the rehabilitated solar data recently made available by the National Climatic Center (SOLMET).

  10. Inexpensive anatomical trainer for bronchoscopy.

    PubMed

    Di Domenico, Stefano; Simonassi, Claudio; Chessa, Leonardo

    2007-08-01

    Flexible fiberoptic bronchoscopy is an indispensable tool for optimal management of intensive care unit patients. However, the acquisition of sufficient training in bronchoscopy is not straightforward during residency, because of technical and ethical problems. Moreover, the use of commercial simulators is limited by their high cost. In order to overcome these limitations, we realized a low-cost anatomical simulator to acquire and maintain the basic skill to perform bronchoscopy in ventilated patients. We used 1.5 mm diameter iron wire to construct the bronchial tree scaffold; glazier-putty was applied to create the anatomical model. The model was covered by several layers of newspaper strips previously immersed in water and vinilic glue. When the model completely dried up, it was detached from the scaffold by cutting it into six pieces, it was reassembled, painted and fitted with an endotracheal tube. We used very cheap material and the final cost was euro16. The trainer resulted in real-scale and anatomically accurate, with appropriate correspondence on endoscopic view between model and patients. All bronchial segments can be explored and easily identified by endoscopic and external vision. This cheap simulator is a valuable tool for practicing, particularly in a hospital with limited resources for medical training.

  11. Conceptual framework of public health surveillance and action and its application in health sector reform.

    PubMed

    McNabb, Scott J N; Chungong, Stella; Ryan, Mike; Wuhib, Tadesse; Nsubuga, Peter; Alemu, Wondi; Carande-Kulis, Vilma; Rodier, Guenael

    2002-01-01

    Because both public health surveillance and action are crucial, the authors initiated meetings at regional and national levels to assess and reform surveillance and action systems. These meetings emphasized improved epidemic preparedness, epidemic response, and highlighted standardized assessment and reform. To standardize assessments, the authors designed a conceptual framework for surveillance and action that categorized the framework into eight core and four support activities, measured with indicators. In application, country-level reformers measure both the presence and performance of the six core activities comprising public health surveillance (detection, registration, reporting, confirmation, analyses, and feedback) and acute (epidemic-type) and planned (management-type) responses composing the two core activities of public health action. Four support activities - communications, supervision, training, and resource provision - enable these eight core processes. National, multiple systems can then be concurrently assessed at each level for effectiveness, technical efficiency, and cost. This approach permits a cost analysis, highlights areas amenable to integration, and provides focused intervention. The final public health model becomes a district-focused, action-oriented integration of core and support activities with enhanced effectiveness, technical efficiency, and cost savings. This reform approach leads to sustained capacity development by an empowerment strategy defined as facilitated, process-oriented action steps transforming staff and the system.

  12. Dual-Mission Large Aircraft Feasibility Study and Aerodynamic Investigation

    NASA Technical Reports Server (NTRS)

    Mavris, Dimitri

    1997-01-01

    A Dual-Mission Large Aircraft, or DMLA, represents the possibility of a single aircraft capable of fulfilling both a Global Reach Aircraft (GRA) and Very Large Transport (VLT) roles. The DMLA, by combining the GRA and VLT into a single new aircraft, could possibly lower the aircraft manufacturer's production costs through the resulting increase in production quantity. This translates into lower aircraft acquisition costs, a primary concern for both the Air Force and commercial airlines. This report outlines the first steps taken in this study, namely the assessment of technical and economic feasibility of the DMLA concept. In the course of this project, specialized GRA and VLT aircraft were sized for their respective missions, using baseline conventional (i.e., lacking advanced enabling technologies) aircraft models from previous work for the Air Force's Wright Laboratory and NASA-Langley. DMLA baseline aircraft were then also developed, by first sizing the aircraft for the more critical of the two missions and then analyzing the aircraft's performance over the other mission. The resulting aircraft performance values were then compared to assess technical feasibility. Finally, the life-cycle costs of each aircraft (GRA, VLT, and DMLA) were analyzed to quantify economic feasibility. These steps were applied to both a two-engine aircraft set, and a four-engine aircraft set.

  13. Elements of complexity in subsurface modeling, exemplified with three case studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freedman, Vicky L.; Truex, Michael J.; Rockhold, Mark

    2017-04-03

    There are complexity elements to consider when applying subsurface flow and transport models to support environmental analyses. Modelers balance the benefits and costs of modeling along the spectrum of complexity, taking into account the attributes of more simple models (e.g., lower cost, faster execution, easier to explain, less mechanistic) and the attributes of more complex models (higher cost, slower execution, harder to explain, more mechanistic and technically defensible). In this paper, modeling complexity is examined with respect to considering this balance. The discussion of modeling complexity is organized into three primary elements: 1) modeling approach, 2) description of process, andmore » 3) description of heterogeneity. Three examples are used to examine these complexity elements. Two of the examples use simulations generated from a complex model to develop simpler models for efficient use in model applications. The first example is designed to support performance evaluation of soil vapor extraction remediation in terms of groundwater protection. The second example investigates the importance of simulating different categories of geochemical reactions for carbon sequestration and selecting appropriate simplifications for use in evaluating sequestration scenarios. In the third example, the modeling history for a uranium-contaminated site demonstrates that conservative parameter estimates were inadequate surrogates for complex, critical processes and there is discussion on the selection of more appropriate model complexity for this application. All three examples highlight how complexity considerations are essential to create scientifically defensible models that achieve a balance between model simplification and complexity.« less

  14. Elements of complexity in subsurface modeling, exemplified with three case studies

    NASA Astrophysics Data System (ADS)

    Freedman, Vicky L.; Truex, Michael J.; Rockhold, Mark L.; Bacon, Diana H.; Freshley, Mark D.; Wellman, Dawn M.

    2017-09-01

    There are complexity elements to consider when applying subsurface flow and transport models to support environmental analyses. Modelers balance the benefits and costs of modeling along the spectrum of complexity, taking into account the attributes of more simple models (e.g., lower cost, faster execution, easier to explain, less mechanistic) and the attributes of more complex models (higher cost, slower execution, harder to explain, more mechanistic and technically defensible). In this report, modeling complexity is examined with respect to considering this balance. The discussion of modeling complexity is organized into three primary elements: (1) modeling approach, (2) description of process, and (3) description of heterogeneity. Three examples are used to examine these complexity elements. Two of the examples use simulations generated from a complex model to develop simpler models for efficient use in model applications. The first example is designed to support performance evaluation of soil-vapor-extraction remediation in terms of groundwater protection. The second example investigates the importance of simulating different categories of geochemical reactions for carbon sequestration and selecting appropriate simplifications for use in evaluating sequestration scenarios. In the third example, the modeling history for a uranium-contaminated site demonstrates that conservative parameter estimates were inadequate surrogates for complex, critical processes and there is discussion on the selection of more appropriate model complexity for this application. All three examples highlight how complexity considerations are essential to create scientifically defensible models that achieve a balance between model simplification and complexity.

  15. Optimization of Automobile Crush Characteristics: Technical Report

    DOT National Transportation Integrated Search

    1975-10-01

    A methodology is developed for the evaluation and optimization of societal costs of two-vehicle automobile collisions. Costs considered in a Figure of Merit include costs of injury/mortality, occupant compartment penetration, collision damage repairs...

  16. 7 CFR 1735.17 - Facilities financed.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... more economically or technically feasible. Economic and technical feasibility will be determined using total long range economic costs and risk analysis. (d) Generally, RUS will not make a loan to another...

  17. Life cycle costing of waste management systems: overview, calculation principles and case studies.

    PubMed

    Martinez-Sanchez, Veronica; Kromann, Mikkel A; Astrup, Thomas Fruergaard

    2015-02-01

    This paper provides a detailed and comprehensive cost model for the economic assessment of solid waste management systems. The model was based on the principles of Life Cycle Costing (LCC) and followed a bottom-up calculation approach providing detailed cost items for all key technologies within modern waste systems. All technologies were defined per tonne of waste input, and each cost item within a technology was characterised by both a technical and an economic parameter (for example amount and cost of fuel related to waste collection), to ensure transparency, applicability and reproducibility. Cost items were classified as: (1) budget costs, (2) transfers (for example taxes, subsidies and fees) and (3) externality costs (for example damage or abatement costs related to emissions and disamenities). Technology costs were obtained as the sum of all cost items (of the same type) within a specific technology, while scenario costs were the sum of all technologies involved in a scenario. The cost model allows for the completion of three types of LCC: a Conventional LCC, for the assessment of financial costs, an Environmental LCC, for the assessment of financial costs whose results are complemented by a Life Cycle Assessment (LCA) for the same system, and a Societal LCC, for socio-economic assessments. Conventional and Environmental LCCs includes budget costs and transfers, while Societal LCCs includes budget and externality costs. Critical aspects were found in the existing literature regarding the cost assessment of waste management, namely system boundary equivalency, accounting for temporally distributed emissions and impacts, inclusions of transfers, the internalisation of environmental impacts and the coverage of shadow prices, and there was also significant confusion regarding terminology. The presented cost model was implemented in two case study scenarios assessing the costs involved in the source segregation of organic waste from 100,000 Danish households and the subsequent co-digestion of organic waste with animal manure. Overall, source segregation resulted in higher financial costs than the alternative of incinerating the organic waste with the residual waste: 1.6 M€/year, of which 0.9 M€/year was costs for extra bins and bags used by the households, 1.0 M€/year for extra collections and -0.3 M€/year saved on incineration. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Flux balance analysis indicates that methane is the lowest cost feedstock for microbial cell factories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Comer, Austin D.; Long, Matthew R.; Reed, Jennifer L.

    The low cost of natural gas has driven significant interest in using C 1 carbon sources (e.g. methane, methanol, CO, syngas) as feedstocks for producing liquid transportation fuels and commodity chemicals. Given the large contribution of sugar and lignocellulosic feedstocks to biorefinery operating costs, natural gas and other C 1 sources may provide an economic advantage. To assess the relative costs of these feedstocks, we performed flux balance analysis on genome-scale metabolic models to calculate the maximum theoretical yields of chemical products from methane, methanol, acetate, and glucose. Yield calculations were performed for every metabolite (as a proxy for desiredmore » products) in the genome-scale metabolic models of three organisms: Escherichia coli (bacterium), Saccharomyces cerevisiae (yeast), and Synechococcus sp. PCC 7002 (cyanobacterium). The calculated theoretical yields and current feedstock prices provided inputs to create comparative feedstock cost surfaces. Our analysis shows that, at current market prices, methane feedstock costs are consistently lower than glucose when used as a carbon and energy source for microbial chemical production. Conversely, methanol is costlier than glucose under almost all price scenarios. Acetate feedstock costs could be less than glucose given efficient acetate production from low-cost syngas using nascent biological gas to liquids (BIO-GTL) technologies. Furthermore, our analysis suggests that research should focus on overcoming the technical challenges of methane assimilation and/or yield of acetate via BIO-GTL to take advantage of low-cost natural gas rather than using methanol as a feedstock.« less

  19. Commercial Discount Rate Estimation for Efficiency Standards Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fujita, K. Sydny

    2016-04-13

    Underlying each of the Department of Energy's (DOE's) federal appliance and equipment standards are a set of complex analyses of the projected costs and benefits of regulation. Any new or amended standard must be designed to achieve significant additional energy conservation, provided that it is technologically feasible and economically justified (42 U.S.C. 6295(o)(2)(A)). A proposed standard is considered economically justified when its benefits exceed its burdens, as represented by the projected net present value of costs and benefits. DOE performs multiple analyses to evaluate the balance of costs and benefits of commercial appliance and equipment e efficiency standards, at themore » national and individual building or business level, each framed to capture different nuances of the complex impact of standards on the commercial end user population. The Life-Cycle Cost (LCC) analysis models the combined impact of appliance first cost and operating cost changes on a representative commercial building sample in order to identify the fraction of customers achieving LCC savings or incurring net cost at the considered efficiency levels.1 Thus, the choice of commercial discount rate value(s) used to calculate the present value of energy cost savings within the Life-Cycle Cost model implicitly plays a key role in estimating the economic impact of potential standard levels.2 This report is intended to provide a more in-depth discussion of the commercial discount rate estimation process than can be readily included in standard rulemaking Technical Support Documents (TSDs).« less

  20. Flux balance analysis indicates that methane is the lowest cost feedstock for microbial cell factories

    DOE PAGES

    Comer, Austin D.; Long, Matthew R.; Reed, Jennifer L.; ...

    2017-07-10

    The low cost of natural gas has driven significant interest in using C 1 carbon sources (e.g. methane, methanol, CO, syngas) as feedstocks for producing liquid transportation fuels and commodity chemicals. Given the large contribution of sugar and lignocellulosic feedstocks to biorefinery operating costs, natural gas and other C 1 sources may provide an economic advantage. To assess the relative costs of these feedstocks, we performed flux balance analysis on genome-scale metabolic models to calculate the maximum theoretical yields of chemical products from methane, methanol, acetate, and glucose. Yield calculations were performed for every metabolite (as a proxy for desiredmore » products) in the genome-scale metabolic models of three organisms: Escherichia coli (bacterium), Saccharomyces cerevisiae (yeast), and Synechococcus sp. PCC 7002 (cyanobacterium). The calculated theoretical yields and current feedstock prices provided inputs to create comparative feedstock cost surfaces. Our analysis shows that, at current market prices, methane feedstock costs are consistently lower than glucose when used as a carbon and energy source for microbial chemical production. Conversely, methanol is costlier than glucose under almost all price scenarios. Acetate feedstock costs could be less than glucose given efficient acetate production from low-cost syngas using nascent biological gas to liquids (BIO-GTL) technologies. Furthermore, our analysis suggests that research should focus on overcoming the technical challenges of methane assimilation and/or yield of acetate via BIO-GTL to take advantage of low-cost natural gas rather than using methanol as a feedstock.« less

  1. Pediatric laryngeal simulator using 3D printed models: A novel technique.

    PubMed

    Kavanagh, Katherine R; Cote, Valerie; Tsui, Yvonne; Kudernatsch, Simon; Peterson, Donald R; Valdez, Tulio A

    2017-04-01

    Simulation to acquire and test technical skills is an essential component of medical education and residency training in both surgical and nonsurgical specialties. High-quality simulation education relies on the availability, accessibility, and reliability of models. The objective of this work was to describe a practical pediatric laryngeal model for use in otolaryngology residency training. Ideally, this model would be low-cost, have tactile properties resembling human tissue, and be reliably reproducible. Pediatric laryngeal models were developed using two manufacturing methods: direct three-dimensional (3D) printing of anatomical models and casted anatomical models using 3D-printed molds. Polylactic acid, acrylonitrile butadiene styrene, and high-impact polystyrene (HIPS) were used for the directly printed models, whereas a silicone elastomer (SE) was used for the casted models. The models were evaluated for anatomic quality, ease of manipulation, hardness, and cost of production. A tissue likeness scale was created to validate the simulation model. Fleiss' Kappa rating was performed to evaluate interrater agreement, and analysis of variance was performed to evaluate differences among the materials. The SE provided the most anatomically accurate models, with the tactile properties allowing for surgical manipulation of the larynx. Direct 3D printing was more cost-effective than the SE casting method but did not possess the material properties and tissue likeness necessary for surgical simulation. The SE models of the pediatric larynx created from a casting method demonstrated high quality anatomy, tactile properties comparable to human tissue, and easy manipulation with standard surgical instruments. Their use in a reliable, low-cost, accessible, modular simulation system provides a valuable training resource for otolaryngology residents. N/A. Laryngoscope, 127:E132-E137, 2017. © 2016 The American Laryngological, Rhinological and Otological Society, Inc.

  2. Cost-benefit analysis of a socio-technical intervention in a Brazilian footwear company.

    PubMed

    Guimarães, L B de M; Ribeiro, J L D; Renner, J S

    2012-09-01

    This article presents a costs-benefits analysis of a macroergonomic intervention in a Brazilian footwear company. Comparing results of a pilot line (composed by 100 multiskilled workers organized in teams) with eight traditional lines (still working in a one human being/one task model) the intervention showed to be worth pursuing since achieved gains were higher than intervention costs: there was a reduction in human resource costs (80% reduction in industrial accidents, 100% reduction in work-related musculoskeletal disorders or WMSD, medical consultations and turnover, and a 45.65% reduction in absenteeism) and production improvement (productivity increased in 3% and production waste decrease to less than 1%). The net intervention value of the intervention was around U$ 430,000 with a benefit-to-cost ratio of 7.2. Moreover, employees who worked in the pilot line understood that their quality of work life improved, compensating the anxiety brought up by the radical changes implemented. Copyright © 2012 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  3. Space reflector technology and its system implications

    NASA Technical Reports Server (NTRS)

    Billman, K. W.; Gilbreath, W. P.; Bowen, S. W.

    1979-01-01

    The technical feasibility of providing nearly continuous solar energy to a world-distributed set of conversion sites by means of a system of orbiting, large-area, low-areal-density reflecting structures is examined. Requisite mirror area to provide a chosen, year-averaged site intensity is shown. A modeled reflector structure, with suitable planarity and ability to meet operational torques and loads, is discussed. Typical spatial and temporal insolation profiles are presented. These determine the sizing of components and the output electric power from a baselined photovoltaic conversion system. Technical and economic challenges which, if met, would allow the system to provide a large fraction of future world energy needs at costs competitive to circa-1995 fossil and nuclear sources are discussed.

  4. DOE-DARPA High-Performance Corrosion-Resistant Materials (HPCRM), Annual HPCRM Team Meeting & Technical Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, J; Brown, B; Bayles, B

    The overall goal is to develop high-performance corrosion-resistant iron-based amorphous-metal coatings for prolonged trouble-free use in very aggressive environments: seawater & hot geothermal brines. The specific technical objectives are: (1) Synthesize Fe-based amorphous-metal coating with corrosion resistance comparable/superior to Ni-based Alloy C-22; (2) Establish processing parameter windows for applying and controlling coating attributes (porosity, density, bonding); (3) Assess possible cost savings through substitution of Fe-based material for more expensive Ni-based Alloy C-22; (4) Demonstrate practical fabrication processes; (5) Produce quality materials and data with complete traceability for nuclear applications; and (6) Develop, validate and calibrate computational models to enable lifemore » prediction and process design.« less

  5. Shale Gas Boom or Bust? Estimating US and Global Economically Recoverable Resources

    NASA Astrophysics Data System (ADS)

    Brecha, R. J.; Hilaire, J.; Bauer, N.

    2014-12-01

    One of the most disruptive energy system technological developments of the past few decades is the rapid expansion of shale gas production in the United States. Because the changes have been so rapid there are great uncertainties as to the impacts of shale production for medium- and long-term energy and climate change mitigation policies. A necessary starting point for incorporating shale resources into modeling efforts is to understand the size of the resource, how much is technically recoverable (TRR), and finally, how much is economically recoverable (ERR) at a given cost. To assess production costs of shale gas, we combine top-down data with detailed bottom-up information. Studies solely based on top-down approaches do not adequately account for the heterogeneity of shale gas deposits and are unlikely to appropriately estimate extraction costs. We design an expedient bottom-up method based on publicly available US data to compute the levelized costs of shale gas extraction. Our results indicate the existence of economically attractive areas but also reveal a dramatic cost increase as lower-quality reservoirs are exploited. Extrapolating results for the US to the global level, our best estimate suggests that, at a cost of 6 US$/GJ, only 39% of the technically recoverable resources reported in top-down studies should be considered economically recoverable. This estimate increases to about 77% when considering optimistic TRR and estimated ultimate recovery parameters but could be lower than 12% for more pessimistic parameters. The current lack of information on the heterogeneity of shale gas deposits as well as on the development of future production technologies leads to significant uncertainties regarding recovery rates and production costs. Much of this uncertainty may be inherent, but for energy system planning purposes, with or without climate change mitigation policies, it is crucial to recognize the full ranges of recoverable quantities and costs.

  6. 32 CFR Appendix D to Part 286 - DD Form 2086-1, “Record of Freedom of Information (FOI) Processing Cost for Technical Data”

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false DD Form 2086-1, âRecord of Freedom of Information (FOI) Processing Cost for Technical Dataâ D Appendix D to Part 286 National Defense Department of... FREEDOM OF INFORMATION ACT PROGRAM REGULATION Pt. 286, App. D Appendix D to Part 286—DD Form 2086-1...

  7. Abstraction of an Affective-Cognitive Decision Making Model Based on Simulated Behaviour and Perception Chains

    NASA Astrophysics Data System (ADS)

    Sharpanskykh, Alexei; Treur, Jan

    Employing rich internal agent models of actors in large-scale socio-technical systems often results in scalability issues. The problem addressed in this paper is how to improve computational properties of a complex internal agent model, while preserving its behavioral properties. The problem is addressed for the case of an existing affective-cognitive decision making model instantiated for an emergency scenario. For this internal decision model an abstracted behavioral agent model is obtained, which ensures a substantial increase of the computational efficiency at the cost of approximately 1% behavioural error. The abstraction technique used can be applied to a wide range of internal agent models with loops, for example, involving mutual affective-cognitive interactions.

  8. Space station program phase B definition: Nuclear reactor-powered space station cost and schedules

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.

  9. A research design for the quantification of the neuropeptides substance p and calcitonin gene-related Peptide in rat skin using Western blot analysis.

    PubMed

    Lapin, Guilherme Abbud Franco; Hochman, Bernardo; Nishioka, Michele Akemi; Maximino, Jessica Ruivo; Chadi, Gerson; Ferreira, Lydia Masako

    2015-06-01

    To describe and standardize a protocol that overcomes the technical limitations of Western blot (WB) analysis in the quantification of the neuropeptides substance P (SP) and calcitonin gene-related peptide (CGRP) following nociceptive stimuli in rat skin. Male Wistar rats (Rattus norvegicus albinus) weighing 250 to 350 g were used in this study. Elements of WB analysis were adapted by using specific manipulation of samples, repeated cycles of freezing and thawing, more thorough maceration, and a more potent homogenizer; increasing lytic reagents; promoting greater inhibition of protease activity; and using polyvinylidene fluoride membranes as transfer means for skin-specific protein. Other changes were also made to adapt the WB analysis to a rat model. University research center. Western blot analysis adapted to a rat model. This research design has proven effective in collecting and preparing skin samples to quantify SP and CGRP using WB analysis in rat skin. This study described a research design that uses WB analysis as a reproducible, technically accessible, and cost-effective method for the quantification of SP and CGRP in rat skin that overcomes technical biases.

  10. Efficiency assessment of wastewater treatment plants: A data envelopment analysis approach integrating technical, economic, and environmental issues.

    PubMed

    Castellet, Lledó; Molinos-Senante, María

    2016-02-01

    The assessment of the efficiency of wastewater treatment plants (WWTPs) is essential to compare their performance and consequently to identify the best operational practices that can contribute to the reduction of operational costs. Previous studies have evaluated the efficiency of WWTPs using conventional data envelopment analysis (DEA) models. Most of these studies have considered the operational costs of the WWTPs as inputs, while the pollutants removed from wastewater are treated as outputs. However, they have ignored the fact that each pollutant removed by a WWTP involves a different environmental impact. To overcome this limitation, this paper evaluates for the first time the efficiency of a sample of WWTPs by applying the weighted slacks-based measure model. It is a non-radial DEA model which allows assigning weights to the inputs and outputs according their importance. Thus, the assessment carried out integrates environmental issues with the traditional "techno-economic" efficiency assessment of WWTPs. Moreover, the potential economic savings for each cost item have been quantified at a plant level. It is illustrated that the WWTPs analyzed have significant room to save staff and energy costs. Several managerial implications to help WWTPs' operators make informed decisions were drawn from the methodology and empirical application carried out. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Reuse of assembly systems: a great ecological and economical potential for facility suppliers

    NASA Astrophysics Data System (ADS)

    Weule, Hartmut; Buchholz, Carsten

    2001-02-01

    In addition to the consumer goods, capital goods offer a great potential for ecological and economic optimization. In view of this fact the project WiMonDi (Re-Use of Assembly Systems as new Business Fields), started in September 1998, focuses a marketable Remanufacturing and Re-Use of modules and components of assembly systems by using technically and organizationally continuous concepts. The objective of the closed Facility-Management-System is to prolong the serviceable lifespan of assembly facilities through the organized dismantling, refurbishment and reconditioning of the assembly facilities as well as their components. Therefore, it is necessary to develop easible and methodical strategies to realize a workable Re-Use concept. Within the project the focus is based on the optimization of Re-Use-strategies - the direct Re-Use, the Re-Use including Refurbishment as well as Material Recycling. The decision for an optimal strategy depends on economical (e.g. residual value, cost/benefit of relevant processes, etc.), ecological (e.g. pollutant components /substances), etc.) and technical parameters (e.g. reliability, etc.). For the purpose to integrate the total cost-of-ownership of products or components, WiMonDi integrates the costs of the use of products as well as the Re-Use costs/benefits. To initiate the conception of new distribution and user models between the supplier and the user of assembly facilities the described approach is conducted in close cooperation between Industry and University.

  12. AskIT Service Desk Support Value Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashcraft, Phillip Lynn; Cummings, Susan M.; Fogle, Blythe G.

    The value model discussed herein provides an accurate and simple calculation of the funding required to adequately staff the AskIT Service Desk (SD).  The model is incremental – only technical labor cost is considered.  All other costs, such as management, equipment, buildings, HVAC, and training are considered common elements of providing any labor related IT Service. Depending on the amount of productivity loss and the number of hours the defect was unresolved, the value of resolving work from the SD is unquestionably an economic winner; the average cost of $16 per SD resolution can commonly translate to cost avoidance exceeding well overmore » $100. Attempting to extract too much from the SD will likely create a significant downside. The analysis used to develop the value model indicates that the utilization of the SD is very high (approximately 90%).  As a benchmark, consider a comment from a manager at Vitalyst (a commercial IT service desk) that their utilization target is approximately 60%.  While high SD utilization is impressive, over the long term it is likely to cause unwanted consequences to staff such as higher turnover, illness, or burnout.  A better solution is to staff the SD so that analysts have time to improve skills through training, develop knowledge, improve processes, collaborate with peers, and improve customer relationship skills.« less

  13. Study of job burnout in technical writers and technical illustrators/designers at LLNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rice, J A

    According to the American Institute of Stress, job stress is estimated to cost American industry more than $200 billion a year. These costs are, in part, related to the estimated 1 million employees that will be absent on an average workday because of stress; 75 percent of visits to primary care physicians are for stress-related problems. California workers' compensation claims for stress cost $1 billion for medical and legal fees alone (Murphy, 1997). But, there is another dimension to stress that needs to be addressed. Job stress can be a precursor to job burnout. Burnout is a loss of motivation,more » and antidotes for job stress will not necessarily alleviate or stop job burnout. Job burnout is experienced as exhaustion on physical, emotional, and cognitive levels. Burnout can include withdrawal and decreasing involvement on the job, seriously affecting job satisfaction, turnover, absenteeism, and productivity (Dwyer & Ganster, 1991; Erickson & Gunderson, 1972; Spector & Jex, 1991). The research project described in this paper examined whether job burnout exists in the technical writer and technical illustrator/designer occupations in the Technical Information Department at Lawrence Livermore National Laboratory. This study also determined at what age and after how many years of service these employees were most likely to experience job burnout, whether it affects men or women most, and if writers in a technical organization experience job burnout more than illustrators/designers in that organization.« less

  14. Pattern-Based Design of Insider Threat Programs

    DTIC Science & Technology

    2014-12-01

    also applied these models to develop best practices and technical controls for mitigating insider threat. In some cases of in- sider threat...departing insiders might take valuable IP with them. One set of practices and controls designed to reduce the risk of insider IP theft is based on case data...describing this set of practices and controls helps to balance the costs of monitoring employee behavior for suspicious actions against the risk of

  15. Technical description of space ultra reliable modular computer (SUMC), model 2 B

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The design features of the SUMC-2B computer, also called the IBM-HTC are described. It is general purpose digital computer implemented with flexible hardware elements and microprograming to enable low cost customizing to a wide range of applications. It executes the S/360 standard instruction set to maintain problem state compability. Memory technology, extended instruction sets, and I/O channel variations are among the available options.

  16. Contract management using cause-effect clues in service worksheets.

    PubMed

    Chen, J H

    1996-01-01

    Sophisticated equipment often needs intensive technical resources to maintain its system availability. Service contracts can be an easy channel to outside technical resources. Usually, a service contract purchaser only sees its cost instead of its maintenance quality. A system's needs, however, depend on the trade-off between the cost paid and the quality received. If a clinical engineer can actively interpret and integrate the cause-effect consequences on the compiled service worksheets, those clues can serve as a criterion to justify the quality and the cost-effectiveness of a service contract. Through the analysis of the service labor consumed, the justification of the parts replaced, and the assessment of the "fit" to system availability, this paper provides a cost-effective tool for equipment management.

  17. A data envelope analysis to assess factors affecting technical and economic efficiency of individual broiler breeder hens.

    PubMed

    Romero, L F; Zuidhof, M J; Jeffrey, S R; Naeima, A; Renema, R A; Robinson, F E

    2010-08-01

    This study evaluated the effect of feed allocation and energetic efficiency on technical and economic efficiency of broiler breeder hens using the data envelope analysis methodology and quantified the effect of variables affecting technical efficiency. A total of 288 Ross 708 pullets were placed in individual cages at 16 wk of age and assigned to 1 of 4 feed allocation groups. Three of them had feed allocated on a group basis with divergent BW targets: standard, high (standard x 1.1), and low (standard x 0.9). The fourth group had feed allocated on an individual bird basis following the standard BW target. Birds were classified in 3 energetic efficiency categories: low, average, and high, based on estimated maintenance requirements. Technical efficiency considered saleable chicks as output and cumulative ME intake and time as inputs. Economic efficiency of feed allocation treatments was analyzed under different cost scenarios. Birds with low feed allocation exhibited a lower technical efficiency (69.4%) than standard (72.1%), which reflected a reduced egg production rate. Feed allocation of the high treatment could have been reduced by 10% with the same chick production as the standard treatment. The low treatment exhibited reduced economic efficiency at greater capital costs, whereas high had reduced economic efficiency at greater feed costs. The average energetic efficiency hens had a lower technical efficiency in the low compared with the standard feed allocation. A 1% increment in estimated maintenance requirement changed technical efficiency by -0.23%, whereas a 1% increment in ME intake had a -0.47% effect. The negative relationship between technical efficiency and ME intake was counterbalanced by a positive correlation of ME intake and egg production. The negative relationship of technical efficiency and maintenance requirements was synergized by a negative correlation of hen maintenance and egg production. Economic efficiency methodologies are effective tools to assess the economic effect of selection and flock management programs because biological, allocative, and economic factors can be independently analyzed.

  18. The Cost of Doing Business: Cost Structure of Electronic Immunization Registries

    PubMed Central

    Fontanesi, John M; Flesher, Don S; De Guire, Michelle; Lieberthal, Allan; Holcomb, Kathy

    2002-01-01

    Objective To predict the true cost of developing and maintaining an electronic immunization registry, and to set the framework for developing future cost-effective and cost-benefit analysis. Data Sources/Study Setting Primary data collected at three immunization registries located in California, accounting for 90 percent of all immunization records in registries in the state during the study period. Study Design A parametric cost analysis compared registry development and maintenance expenditures to registry performance requirements. Data Collection/Extraction Methods Data were collected at each registry through interviews, reviews of expenditure records, technical accomplishments development schedules, and immunization coverage rates. Principal Findings The cost of building immunization registries is predictable and independent of the hardware/software combination employed. The effort requires four man-years of technical effort or approximately $250,000 in 1998 dollars. Costs for maintaining a registry were approximately $5,100 per end user per three-year period. Conclusions There is a predictable cost structure for both developing and maintaining immunization registries. The cost structure can be used as a framework for examining the cost-effectiveness and cost-benefits of registries. The greatest factor effecting improvement in coverage rates was ongoing, user-based administrative investment. PMID:12479497

  19. Economic evaluation of pressure ulcer care: a cost minimization analysis of preventive strategies.

    PubMed

    Schuurman, Jaap-Peter; Schoonhoven, Lisette; Defloor, Tom; van Engelshoven, Ilse; van Ramshorst, Bert; Buskens, Erik

    2009-01-01

    The purpose of this study was to determine the cost for prevention and treatment of pressure ulcers from a hospital perspective and to identify the least resource-intensive pressure ulcer prevention strategy. Cost analyses were examined from a hospital perspective using direct costs. The study was carried out alongside a prospective cohort study on the incidence and risk factors for pressure ulcers. Two large teaching hospitals in the Netherlands with (partly) opposing approaches in prevention, a technological versus a human approach, were analyzed. The main outcome measures were resource use, costs of preventive measures and treatment, and pressure ulcer incidence in both hospitals. Pressure ulcer prevention through a predominantly technical approach resulted in a similar incidence rate as prevention through a predominantly human approach. However, the technical approach was considerably less expensive.

  20. Technical Report: Installed Cost Benchmarks and Deployment Barriers for

    Science.gov Websites

    Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage Q1 2016 Installed Cost Benchmarks and Deployment Barriers for Residential Solar with Energy Storage Researchers from NREL published a report that provides detailed component and system-level cost breakdowns for

  1. Enough to Go 'Round? Thinking Smart about Total Cost of Ownership

    ERIC Educational Resources Information Center

    McIntire, Todd

    2006-01-01

    Total cost of ownership or TCO refers to the life cycle of costs for technology, including both direct and indirect expenses. TCO includes costs incurred by capital (hardware, software, and facilities); administration and operation (planning, upgrade, replacement, and technical support); and end-user operation (staff development and user…

  2. Minimum-complexity helicopter simulation math model

    NASA Technical Reports Server (NTRS)

    Heffley, Robert K.; Mnich, Marc A.

    1988-01-01

    An example of a minimal complexity simulation helicopter math model is presented. Motivating factors are the computational delays, cost, and inflexibility of the very sophisticated math models now in common use. A helicopter model form is given which addresses each of these factors and provides better engineering understanding of the specific handling qualities features which are apparent to the simulator pilot. The technical approach begins with specification of features which are to be modeled, followed by a build up of individual vehicle components and definition of equations. Model matching and estimation procedures are given which enable the modeling of specific helicopters from basic data sources such as flight manuals. Checkout procedures are given which provide for total model validation. A number of possible model extensions and refinement are discussed. Math model computer programs are defined and listed.

  3. Computer graphics to display plume-modeling results for nuclear emergency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krawchuk, B.; Gotham, I.; Matuszek, J.

    1985-01-01

    New York uses a color graphics display/analysis system, ANALYSE, to portray the results of the plume transport models, MATHEW/ADPIC and PATRIC. As a tool for the researcher and meteorologist, it provides a detailed look into the model results, input and performance. Used in an automatic mode and pre-programmed for use in an emergency, it provides a sequence of informative and attractive of displays to assessment staff at the State EOC through an easily-learned display module. Though successfully implemented on low-cost display and communication equipment, further technical improvements and software development would greatly enhance the system for use in an emergency.

  4. Value-based formulas for purchasing. PEHP's designated service provider program: value-based purchasing through global fees.

    PubMed

    Emery, D W

    1997-01-01

    In many circles, managed care and capitation have become synonymous; unfortunately, the assumptions informing capitation are based on a flawed unidimensional model of risk. PEHP of Utah has rejected the unidimensional model and has therefore embraced a multidimensional model of risk that suggests that global fees are the optimal purchasing modality. A globally priced episode of care forms a natural unit of analysis that enhances purchasing clarity, allows providers to more efficiently focus on the Marginal Rate of Technical Substitution, and conforms to the multidimensional reality of risk. Most importantly, global fees simultaneously maximize patient choice and provider cost consciousness.

  5. Evaluation of resource impact factors versus social cost estimates in determining building energy performance standard levels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nieves, L.A.; Nesse, R.J.; Adams, R.C.

    1979-12-01

    In order to increase the welfare of society through the implementation of a building energy-performance standard, a method is required by which the least-cost means of obtaining the desired space conditioning of a building can be estimated. In other words, a life-cycle cost model must be developed to simulate the energy-related building-design decisions that would take place if resources were being allocated efficiently. The cost-minimizing model must incorporate technically efficient conservation strategies and fuel-conversion equipment, and the prices used must reflect the social value of the fuels and capital equipment used. This report explores the feasibility of developing a factormore » that could be used to adjust a design energy budget to account for the external costs associated with that energy consumption. One such factor, RIF (resource impact factor) has been proposed by ASHRAE. Though ASHRAE suggested the RIF x RUF (resource utilization factor) multiplier concept, RIF's were not explicitly defined. Weber (1978) suggested that RIF be defined as a ratio of social costs to effective market price. The basis for a RIF used in conjunction with a RUF is evaluated here and is found lacking. To fill the gap, a social-cost approach is developed that addresses the goals of both RIF's and RUF's. The rationale for using such an approach stems from the existence of differences between retail prices and the actual social costs of fuels.« less

  6. Reaching a 1.5°C target: socio-technical challenges for a rapid transition to low-carbon electricity systems.

    PubMed

    Eyre, Nick; Darby, Sarah J; Grünewald, Philipp; McKenna, Eoghan; Ford, Rebecca

    2018-05-13

    A 1.5°C global average target implies that we should no longer focus on merely incremental emissions reductions from the electricity system, but rather on fundamentally re-envisaging a system that, sooner rather than later, becomes carbon free. Many low-carbon technologies are surpassing mainstream predictions for both uptake and cost reduction. Their deployment is beginning to be disruptive within established systems. 'Smart technologies' are being developed to address emerging challenges of system integration, but their rates of future deployment remain uncertain. We argue that transition towards a system that can fully displace carbon generation sources will require expanding the focus of our efforts beyond technical solutions. Recognizing that change has social and technical dimensions, and that these interact strongly, we set out a socio-technical review that covers electricity infrastructure, citizens, business models and governance. It describes some of the socio-technical challenges that need to be addressed for the successful transition of the existing electricity systems. We conclude that a socio-technical understanding of electricity system transitions offers new and better insights into the potential and challenges for rapid decarbonization.This article is part of the theme issue 'The Paris Agreement: understanding the physical and social challenges for a warming world of 1.5°C above pre-industrial levels'. © 2018 The Author(s).

  7. Economic decision making and the application of nonparametric prediction models

    USGS Publications Warehouse

    Attanasi, E.D.; Coburn, T.C.; Freeman, P.A.

    2008-01-01

    Sustained increases in energy prices have focused attention on gas resources in low-permeability shale or in coals that were previously considered economically marginal. Daily well deliverability is often relatively small, although the estimates of the total volumes of recoverable resources in these settings are often large. Planning and development decisions for extraction of such resources must be areawide because profitable extraction requires optimization of scale economies to minimize costs and reduce risk. For an individual firm, the decision to enter such plays depends on reconnaissance-level estimates of regional recoverable resources and on cost estimates to develop untested areas. This paper shows how simple nonparametric local regression models, used to predict technically recoverable resources at untested sites, can be combined with economic models to compute regional-scale cost functions. The context of the worked example is the Devonian Antrim-shale gas play in the Michigan basin. One finding relates to selection of the resource prediction model to be used with economic models. Models chosen because they can best predict aggregate volume over larger areas (many hundreds of sites) smooth out granularity in the distribution of predicted volumes at individual sites. This loss of detail affects the representation of economic cost functions and may affect economic decisions. Second, because some analysts consider unconventional resources to be ubiquitous, the selection and order of specific drilling sites may, in practice, be determined arbitrarily by extraneous factors. The analysis shows a 15-20% gain in gas volume when these simple models are applied to order drilling prospects strategically rather than to choose drilling locations randomly. Copyright ?? 2008 Society of Petroleum Engineers.

  8. 7 CFR 1410.41 - Levels and rates for cost-share payments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... shall not pay more than 50 percent of the actual or average cost of establishing eligible practices.... (b) The average cost of performing a practice may be determined by CCC based on recommendations from the State Technical Committee. Such cost may be the average cost in a State, a county, or a part of a...

  9. Conceptual Framework for Conducting Cost Benefit Studies in Wisconsin VTAE and Cost Benefit Studies--VTAE Programs.

    ERIC Educational Resources Information Center

    Webb, Robert I.; And Others

    The step-by-step cost benefit study, confined to measuring and comparing economic costs with economic benefits, is based on the 1971, 1972, and 1973 classes graduating from the Agribusiness-Machinery Partsman-Salesman Program at District One Technical Institute in Eau Claire, Wisconsin. Numerous tables throughout the report contain cost benefit…

  10. Cost/benefit tradeoffs for reducing the energy consumption of the commercial air transportation system. Volume 1: Technical analysis

    NASA Technical Reports Server (NTRS)

    Kraus, E. F.

    1976-01-01

    The effectiveness and associated costs of operational and technical options for reduced fuel consumption by Douglas aircraft in the domestic airline fleet are assessed. Areas explored include alternative procedures for airline and flight operations, advanced and state of the art technology, modification and derivative configurations, new near-term aircraft, turboprop configuration studies, and optimum aircraft geometry. Data for each aircraft studied is presented in tables and graphs.

  11. A Framework for Understanding and Generating Integrated Solutions for Residential Peak Energy Demand

    PubMed Central

    Buys, Laurie; Vine, Desley; Ledwich, Gerard; Bell, John; Mengersen, Kerrie; Morris, Peter; Lewis, Jim

    2015-01-01

    Supplying peak energy demand in a cost effective, reliable manner is a critical focus for utilities internationally. Successfully addressing peak energy concerns requires understanding of all the factors that affect electricity demand especially at peak times. This paper is based on past attempts of proposing models designed to aid our understanding of the influences on residential peak energy demand in a systematic and comprehensive way. Our model has been developed through a group model building process as a systems framework of the problem situation to model the complexity within and between systems and indicate how changes in one element might flow on to others. It is comprised of themes (social, technical and change management options) networked together in a way that captures their influence and association with each other and also their influence, association and impact on appliance usage and residential peak energy demand. The real value of the model is in creating awareness, understanding and insight into the complexity of residential peak energy demand and in working with this complexity to identify and integrate the social, technical and change management option themes and their impact on appliance usage and residential energy demand at peak times. PMID:25807384

  12. A framework for understanding and generating integrated solutions for residential peak energy demand.

    PubMed

    Buys, Laurie; Vine, Desley; Ledwich, Gerard; Bell, John; Mengersen, Kerrie; Morris, Peter; Lewis, Jim

    2015-01-01

    Supplying peak energy demand in a cost effective, reliable manner is a critical focus for utilities internationally. Successfully addressing peak energy concerns requires understanding of all the factors that affect electricity demand especially at peak times. This paper is based on past attempts of proposing models designed to aid our understanding of the influences on residential peak energy demand in a systematic and comprehensive way. Our model has been developed through a group model building process as a systems framework of the problem situation to model the complexity within and between systems and indicate how changes in one element might flow on to others. It is comprised of themes (social, technical and change management options) networked together in a way that captures their influence and association with each other and also their influence, association and impact on appliance usage and residential peak energy demand. The real value of the model is in creating awareness, understanding and insight into the complexity of residential peak energy demand and in working with this complexity to identify and integrate the social, technical and change management option themes and their impact on appliance usage and residential energy demand at peak times.

  13. Technical opportunities to reduce global anthropogenic emissions of nitrous oxide

    NASA Astrophysics Data System (ADS)

    Winiwarter, Wilfried; Höglund-Isaksson, Lena; Klimont, Zbigniew; Schöpp, Wolfgang; Amann, Markus

    2018-01-01

    We describe a consistent framework developed to quantify current and future anthropogenic emissions of nitrous oxide and the available technical abatement options by source sector for 172 regions globally. About 65% of the current emissions derive from agricultural soils, 8% from waste, and 4% from the chemical industry. Low-cost abatement options are available in industry, wastewater, and agriculture, where they are limited to large industrial farms. We estimate that by 2030, emissions can be reduced by about 6% ±2% applying abatement options at a cost lower than 10 €/t CO2-eq. The largest abatement potential at higher marginal costs is available from agricultural soils, employing precision fertilizer application technology as well as chemical treatment of fertilizers to suppress conversion processes in soil (nitrification inhibitors). At marginal costs of up to 100 €/t CO2-eq, about 18% ±6% of baseline emissions can be removed and when considering all available options, the global abatement potential increases to about 26% ±9%. Due to expected future increase in activities driving nitrous oxide emissions, the limited technical abatement potential available means that even at full implementation of reduction measures by 2030, global emissions can be at most stabilized at the pre-2010 level. In order to achieve deeper reductions in emissions, considerable technological development will be required as well as non-technical options like adjusting human diets towards moderate animal protein consumption.

  14. 20 CFR 641.856 - What functions and activities constitute administrative costs?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...

  15. 20 CFR 641.856 - What functions and activities constitute administrative costs?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...

  16. 20 CFR 641.856 - What functions and activities constitute administrative costs?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...

  17. 20 CFR 641.856 - What functions and activities constitute administrative costs?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and... management, accounting, and payroll systems) including the purchase, systems development, and operating costs of such systems and; (6) Costs of technical assistance, professional organization membership dues...

  18. Understanding Cost-Effectiveness of Energy Efficiency Programs: Best Practices, Technical Methods, and Emerging Issues for Policy-Makers

    EPA Pesticide Factsheets

    Reviews the issues and approaches involved in considering and adopting cost-effectiveness tests for energy efficiency, including discussing each perspective represented by the five standard cost-effectiveness tests and clarifying key terms.

  19. 10 CFR 605.16 - Indirect cost limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Indirect cost limitations. 605.16 Section 605.16 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS THE OFFICE OF ENERGY RESEARCH FINANCIAL ASSISTANCE.../technical meetings will not include payment for indirect costs. ...

  20. Micro-cost Analysis of ALK Rearrangement Testing by FISH to Determine Eligibility for Crizotinib Therapy in NSCLC: Implications for Cost Effectiveness of Testing and Treatment.

    PubMed

    Parker, David; Belaud-Rotureau, Marc-Antoine

    2014-01-01

    Break-apart fluorescence in situ hybridization (FISH) is the gold standard test for anaplastic lymphoma kinase (ALK) gene rearrangement. However, this methodology often is assumed to be expensive and potentially cost-prohibitive given the low prevalence of ALK-positive non-small cell lung cancer (NSCLC) cases. To more accurately estimate the cost of ALK testing by FISH, we developed a micro-cost model that accounts for all cost elements of the assay, including laboratory reagents, supplies, capital equipment, technical and pathologist labor, and the acquisition cost of the commercial test and associated reagent kits and controls. By applying a set of real-world base-case parameter values, we determined that the cost of a single ALK break-apart FISH test result is $278.01. Sensitivity analysis on the parameters of batch size, testing efficiency, and the cost of the commercial diagnostic testing products revealed that the cost per result is highly sensitive to batch size, but much less so to efficiency or product cost. This implies that ALK testing by FISH will be most cost effective when performed in high-volume centers. Our results indicate that testing cost may not be the primary determinant of crizotinib (Xalkori(®)) treatment cost effectiveness, and suggest that testing cost is an insufficient reason to limit the use of FISH testing for ALK rearrangement.

  1. Micro-cost Analysis of ALK Rearrangement Testing by FISH to Determine Eligibility for Crizotinib Therapy in NSCLC: Implications for Cost Effectiveness of Testing and Treatment

    PubMed Central

    Parker, David; Belaud-Rotureau, Marc-Antoine

    2014-01-01

    Break-apart fluorescence in situ hybridization (FISH) is the gold standard test for anaplastic lymphoma kinase (ALK) gene rearrangement. However, this methodology often is assumed to be expensive and potentially cost-prohibitive given the low prevalence of ALK-positive non-small cell lung cancer (NSCLC) cases. To more accurately estimate the cost of ALK testing by FISH, we developed a micro-cost model that accounts for all cost elements of the assay, including laboratory reagents, supplies, capital equipment, technical and pathologist labor, and the acquisition cost of the commercial test and associated reagent kits and controls. By applying a set of real-world base-case parameter values, we determined that the cost of a single ALK break-apart FISH test result is $278.01. Sensitivity analysis on the parameters of batch size, testing efficiency, and the cost of the commercial diagnostic testing products revealed that the cost per result is highly sensitive to batch size, but much less so to efficiency or product cost. This implies that ALK testing by FISH will be most cost effective when performed in high-volume centers. Our results indicate that testing cost may not be the primary determinant of crizotinib (Xalkori®) treatment cost effectiveness, and suggest that testing cost is an insufficient reason to limit the use of FISH testing for ALK rearrangement. PMID:25520569

  2. Thin EFG octagons

    NASA Astrophysics Data System (ADS)

    Kalejs, J. P.

    1994-06-01

    This report describes the impact of the technical achievements made in the first 18 months of the three year PVMaT program at Mobil Solar on lowering the manufacturing costs of its photovoltaic polycrystalline silicon-based modules. Manufacturing cost decreases are being achieved through a reduction of silicon material utilization, increases in productivity and yield in crystal growth, and through improvements in the laser cutting process for EFG wafers. The yield, productivity, and throughput advances made possible by these technical achievements are shown to be able to enhance future market share growth for Mobil Solar products as a consequence of significant reductions in a number of direct manufacturing cost elements in EFG wafer and module production.

  3. Final Report UCLA-Thermochemical Storage with Anhydrous Ammonia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lavine, Adrienne

    In ammonia-based thermochemical energy storage (TCES), ammonia is dissociated endothermically as it absorbs solar energy during the daytime. When energy is required, the reverse reaction releases energy to heat a working fluid such as steam, to produce electricity. Ammonia-based TCES has great advantages of simplicity, low cost reactants, and a strong industrial base in the conventional ammonia industry. The concept has been demonstrated over three decades of research at Australian National University, achieving a 24-hour demonstration of a complete system. At the start of this project, three challenges were identified that would have to be addressed to show that themore » system is technically and economically viable for incorporation into a CSP plant with an advanced, high temperature power block. All three of these challenges have now been addressed: 1. The ammonia synthesis reaction had not, to our knowledge, been carried out at temperatures consistent with modern power blocks (i.e., ~650°C). The technical feasibility of operating a reactor under high-temperature, near-equilibrium conditions was an unknown, and was therefore a technical risk. The project has successfully demonstrated steam heating to 650°C and energy recovery to steam at the 5 kWt level. 2. The ammonia system has a relatively low enthalpy of reaction combined with gas phase reactants. This is not a direct disadvantage since the reactants themselves are low cost. The challenge lies in storing the required volume of reactants cost effectively. Therefore, a second key goal was to show, through techno-economic analysis, that underground storage technologies can be used to store the energy-rich gas at a cost that is consistent with the SunShot cost goal. We have identified two promising technologies for gas storage: storage in salt caverns has an estimated cost of 1(USD)/kWht and storage in drilled shafts could be on the order of 7(USD)/kWht. Together these two options answer the technical challenge associated with storage of gas phase components. 3. While this project is primarily concerned with high-temperature heat recovery and methods to store the gaseous components, it is also important to consider the feasibility of the entire system. Consequently, an additional goal was to perform analysis to show the feasibility of integrating endothermic reactors within a tower receiver. A conceptual design of an ammonia dissociation receiver/reactor has been developed that fits into the same size cylindrical envelope as the molten salt receiver in SAM, and has the same design thermal capacity. The calculated thermal efficiency of this receiver is 94.6%. Thus, this investigation has established the technical feasibility of a surround field tower system using ammonia dissociation. With these challenges addressed, we proceeded to design a full-scale synthesis and heat recovery system. A model was developed and validated by comparison with our experimental data. A parametric study showed, among other things, the importance of using small tube diameters and spacing to enhance heat transfer. Multi-parameter optimization was used to find a design that minimizes the wall material volume. Finally, cost estimation shows that the ammonia system has good prospects of meeting the Sunshot 15(USD)/kWht target: estimated costs of the entire synthesis system for the 220 MWt plant with 6 hours of storage are 13(USD)/kWht using salt cavern storage and 18(USD)/kWht using shaft drilling. Costs per kWht are even lower with more hours of storage. With the established technology of ammonia synthesis as a starting point, the successes of the project have mitigated technical risks associated with high-temperature synthesis reaction, underground storage, and tower receiver design. Estimated costs are less than 15(USD)/kWht with salt cavern storage. It is now possible to map a time line to commercial deployment that is likely to be shorter and less risky than other thermochemical cycles under active investigation. UCLA has filed a patent that protects the new ideas developed during this project. Discussions are ongoing with potential investors with the aim of partnering for further work. As well as immediate improvements and extra work with the existing experimental system, a key goal is to extend it to a small solar-driven project at an early opportunity.« less

  4. Modeling technical efficiency of inshore fishery using data envelopment analysis

    NASA Astrophysics Data System (ADS)

    Rahman, Rahayu; Zahid, Zalina; Khairi, Siti Shaliza Mohd; Hussin, Siti Aida Sheikh

    2016-10-01

    Fishery industry contributes significantly to the economy of Malaysia. This study utilized Data Envelopment Analysis application in estimating the technical efficiency of fishery in Terengganu, a state on the eastern coast of Peninsular Malaysia, based on multiple output, i.e. total fish landing and income of fishermen with six inputs, i.e. engine power, vessel size, number of trips, number of workers, cost and operation distance. The data were collected by survey conducted between November and December 2014. The decision making units (DMUs) involved 100 fishermen from 10 fishery areas. The result showed that the technical efficiency in Season I (dry season) and Season II (rainy season) were 90.2% and 66.7% respectively. About 27% of the fishermen were rated to be efficient during Season I, meanwhile only 13% of the fishermen achieved full efficiency 100% during Season II. The results also found out that there was a significance difference in the efficiency performance between the fishery areas.

  5. Decomposing Cost Efficiency in Regional Long-term Care Provision in Japan.

    PubMed

    Yamauchi, Yasuhiro

    2015-07-12

    Many developed countries face a growing need for long-term care provision because of population ageing. Japan is one such example, given its population's longevity and low birth rate. In this study, we examine the efficiency of Japan's regional long-term care system in FY2010 by performing a data envelopment analysis, a non-parametric frontier approach, on prefectural data and separating cost efficiency into technical, allocative, and price efficiencies under different average unit costs across regions. In doing so, we elucidate the structure of cost inefficiency by incorporating a method for restricting weight flexibility to avoid unrealistic concerns arising from zero optimal weight. The results indicate that technical inefficiency accounts for the highest share of losses, followed by price inefficiency and allocation inefficiency. Moreover, the majority of technical inefficiency losses stem from labor costs, particularly those for professional caregivers providing institutional services. We show that the largest share of allocative inefficiency losses can also be traced to labor costs for professional caregivers providing institutional services, while the labor provision of in-home care services shows an efficiency gain. However, although none of the prefectures gains efficiency by increasing the number of professional caregivers for institutional services, quite a few prefectures would gain allocative efficiency by increasing capital inputs for institutional services. These results indicate that preferred policies for promoting efficiency might vary from region to region, and thus, policy implications should be drawn with care.

  6. STAR--people-powered prioritization: a 21st-century solution to allocation headaches.

    PubMed

    Airoldi, Mara; Morton, Alec; Smith, Jenifer A E; Bevan, Gwyn

    2014-11-01

    The aim of cost effectiveness analysis (CEA) is to inform the allocation of scarce resources. CEA is routinely used in assessing the cost-effectiveness of specific health technologies by agencies such as the National Institute for Health and Clinical Excellence (NICE) in England and Wales. But there is extensive evidence that because of barriers of accessibility and acceptability, CEA has not been used by local health planners in their annual task of allocating fixed budgets to a wide range of types of health care. This paper argues that these planners can use Socio Technical Allocation of Resources (STAR) for that task. STAR builds on the principles of CEA and the practice of program budgeting and marginal analysis. STAR uses requisite models to assess the cost-effectiveness of all interventions considered for resource reallocation by explicitly applying the theory of health economics to evidence of scale, costs, and benefits, with deliberation facilitated through an interactive social process of engaging key stakeholders. In that social process, the stakeholders generate missing estimates of scale, costs, and benefits of the interventions; develop visual models of their relative cost-effectiveness; and interpret the results. We demonstrate the feasibility of STAR by showing how it was used by a local health planning agency of the English National Health Service, the Isle of Wight Primary Care Trust, to allocate a fixed budget in 2008 and 2009. © The Author(s) 2014.

  7. Expert Technical Committee : Bay Bridge Project Assessment meeting, January 6-8, 2005.

    DOT National Transportation Integrated Search

    2005-01-01

    The Expert Technical Committee (ETC) was formed to provide an independent review and : assessment of the history and current status of the San Francisco-Oakland Bay Bridge East Span : Seismic Retrofit Cost Increases.

  8. Cost Estimates For Selected California Smart Traveler Operational Tests, Volume 1, Technical Report

    DOT National Transportation Integrated Search

    1993-03-01

    THIS REPORT ALSO COMPARES THE COSTS OF USING "SMART-TRAVELER" APPROACHES WITH THE COSTS OF EXPANDING CONVENTIONAL TRANSIT SERVICES TO REDUCE TRAFFIC CONGESTION, AIR POLLUTION AND MOBILITY PROBLEMS IN SUBURBAN AREAS, WHERE MOST PEOPLE IN U.S. METROPOL...

  9. Development of decision- making mechanism in engineering design of phased coal mines technical upgrade

    NASA Astrophysics Data System (ADS)

    Kulak, V. Yu; Petrova, T. V.; Novichikhin, A. V.

    2017-09-01

    The approach to a choice of a new mine design and technical upgrade of operating coal mines is substantiated. The choice of the option is made in the following way: the elements of the mine technological system are defined, for each element of the system two levels of costs are allocated - capital and operational; a graph of alternative options of the system is formed by matrix enumeration taking into account the possibility of simultaneous application of different elements, up to 10 000 scenarios are formed; capital and operating costs of options are estimated in the form of coefficients as the cost-to-cost ratio in the base variant, which has already been implemented and the costs of which are already known; ranking of the options at the level of costs and the definition of the 10 preferred are performed. It is established that the application of partial enumeration allows the costs relative to the base variant to be reduced by 10 %; the main constraint of costs reduction is the need to comply with all conditions that ensure industrial safety.

  10. Vehicle Lightweighting: Mass Reduction Spectrum Analysis and Process Cost Modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mascarin, Anthony; Hannibal, Ted; Raghunathan, Anand

    2016-03-01

    The U.S. Department of Energy’s Vehicle Technologies Office, Materials area commissioned a study to model and assess manufacturing economics of alternative design and production strategies for a series of lightweight vehicle concepts. In the first two phases of this effort examined combinations of strategies aimed at achieving strategic targets of 40% and a 45% mass reduction relative to a standard North American midsize passenger sedan at an effective cost of $3.42 per pound (lb) saved. These results have been reported in the Idaho National Laboratory report INL/EXT-14-33863 entitled Vehicle Lightweighting: 40% and 45% Weight Savings Analysis: Technical Cost Modeling formore » Vehicle Lightweighting published in March 2015. The data for these strategies were drawn from many sources, including Lotus Engineering Limited and FEV, Inc. lightweighting studies, U.S. Department of Energy-funded Vehma International of America, Inc./Ford Motor Company Multi-Material Lightweight Prototype Vehicle Demonstration Project, the Aluminum Association Transportation Group, many United States Council for Automotive Research’s/United States Automotive Materials Partnership LLC lightweight materials programs, and IBIS Associates, Inc.’s decades of experience in automotive lightweighting and materials substitution analyses.« less

  11. Analysis and evaluation of process and equipment in tasks 2 and 4 of the Low Cost Solar Array project

    NASA Technical Reports Server (NTRS)

    Goldman, H.; Wolf, M.

    1978-01-01

    Several experimental and projected Czochralski crystal growing process methods were studied and compared to available operations and cost-data of recent production Cz-pulling, in order to elucidate the role of the dominant cost contributing factors. From this analysis, it becomes apparent that substantial cost reductions can be realized from technical advancements which fall into four categories: an increase in furnace productivity; the reduction of crucible cost through use of the crucible for the equivalent of multiple state-of-the-art crystals; the combined effect of several smaller technical improvements; and a carry over effect of the expected availability of semiconductor grade polysilicon at greatly reduced prices. A format for techno-economic analysis of solar cell production processes was developed, called the University of Pennsylvania Process Characterization (UPPC) format. The accumulated Cz process data are presented.

  12. Solar energy system economic evaluation for IBM System 3, Glendo, Wyoming

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This analysis was based on the technical and economic models in f-chart design procedures with inputs based on the characteristics of the parameters of present worth of system cost over a projected twenty year life: life cycle savings, year of positive savings, and year of payback for the optimized solar energy system at each of the analysis sites. The sensitivity of the economic evaluation to uncertainties in constituent system and economic variables was also investigated.

  13. Role of scientific data in health decisions.

    PubMed Central

    Samuels, S W

    1979-01-01

    The distinction between reality and models or methodological assumptions is necessary for an understanding of the use of data--economic, technical or biological--in decision-making. The traditional modes of analysis used in decisions are discussed historically and analytically. Utilitarian-based concepts such as cost-benefit analysis and cannibalistic concepts such as "acceptable risk" are rejected on logical and moral grounds. Historical reality suggests the concept of socially necessary risk determined through the dialectic process in democracy. PMID:120251

  14. Technical Information, Returns to Scale, and the Existence of Competitive Equilibrium.

    DTIC Science & Technology

    1985-05-01

    Economies, Part I. Existence of Bequest Equilibria Part II. Properties of Bequest Equilibria" by Debraj Ray and Douglas Bernheim. 420. "On the Existence...Dasgupta and Debraj Ray . 455. "Procurement, Cost Overruns and Severance: A Study in Commitment and Renegotiation," by Jean Tirole. 456. "Multiparty...Consistent Plans Under Production Uncertainty," by B. Douglas Bernheiu and Debraj Ray . 463 "Free Entry and Stability in a Cournot Model," by Gabrielle Demange

  15. Automated array assembly task, phase 1

    NASA Technical Reports Server (NTRS)

    Carbajal, B. G.

    1977-01-01

    State-of-the-art technologies applicable to silicon solar cell and solar cell module fabrication were assessed. The assessment consisted of a technical feasibility evaluation and a cost projection for high volume production of solar cell modules. Design equations based on minimum power loss were used as a tool in the evaluation of metallization technologies. A solar cell process sensitivity study using models, computer calculations, and experimental data was used to identify process step variation and cell output variation correlations.

  16. Endovascular aneurysm repair delivery redesign leads to quality improvement and cost reduction.

    PubMed

    Warner, Courtney J; Horvath, Alexander J; Powell, Richard J; Columbo, Jesse A; Walsh, Teri R; Goodney, Philip P; Walsh, Daniel B; Stone, David H

    2015-08-01

    Endovascular aneurysm repair (EVAR) is now a mainstay of therapy for abdominal aortic aneurysm, although it remains associated with significant expense. We performed a comprehensive analysis of EVAR delivery at an academic medical center to identify targets for quality improvement and cost reduction in light of impending health care reform. All infrarenal EVARs performed from April 2011 to March 2012 were identified (N = 127). Procedures were included if they met standard commercial instructions for use guidelines, used a single manufacturer, and were billed to Medicare diagnosis-related group 238 (n = 49). By use of DMAIC (define, measure, analyze, improve, and control) quality improvement methodology (define, measure, analyze, improve, control), targets for EVAR quality improvement were identified and high-yield changes were implemented. Procedure technical costs were calculated before and after process redesign. Perioperative services and clinic visits were identified as targets for quality improvement efforts and cost reduction. Mean technical costs before the intervention were $31,672, with endograft implants accounting for 52%. Pricing redesign in collaboration with hospital purchasing reduced mean EVAR technical costs to $28,607, a 10% reduction in overall cost, with endograft implants now accounting for 46%. Perioperative implementation of instrument tray redesign reduced instrument use by 32% (184 vs 132 instruments), saving $50,000 annually. Unnecessary clinic visits were reduced by 39% (1.6 vs 1.1 clinic visits per patient) through implementation of a preclinic imaging protocol. There was no difference in mean length of stay after the intervention. Comprehensive EVAR delivery redesign leads to cost reduction and waste elimination while preserving quality. Future efforts to achieve more competitive and transparent device pricing will make EVAR more cost neutral and enhance its financial sustainability for health care systems. Copyright © 2015 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.

  17. Endovascular aneurysm repair delivery redesign leads to quality improvement and cost reduction

    PubMed Central

    Warner, Courtney J.; Horvath, Alexander J.; Powell, Richard J.; Columbo, Jesse A.; Walsh, Teri R.; Goodney, Philip P.; Walsh, Daniel B.; Stone, David H.

    2017-01-01

    Objective Endovascular aneurysm repair (EVAR) is now a mainstay of therapy for abdominal aortic aneurysm, although it remains associated with significant expense. We performed a comprehensive analysis of EVAR delivery at an academic medical center to identify targets for quality improvement and cost reduction in light of impending health care reform. Methods All infrarenal EVARs performed from April 2011 to March 2012 were identified (N = 127). Procedures were included if they met standard commercial instructions for use guidelines, used a single manufacturer, and were billed to Medicare diagnosis-related group 238 (n = 49). By use of DMAIC (define, measure, analyze, improve, and control) quality improvement methodology (define, measure, analyze, improve, control), targets for EVAR quality improvement were identified and high-yield changes were implemented. Procedure technical costs were calculated before and after process redesign. Results Perioperative services and clinic visits were identified as targets for quality improvement efforts and cost reduction. Mean technical costs before the intervention were $31,672, with endograft implants accounting for 52%. Pricing redesign in collaboration with hospital purchasing reduced mean EVAR technical costs to $28,607, a 10% reduction in overall cost, with endograft implants now accounting for 46%. Perioperative implementation of instrument tray redesign reduced instrument use by 32% (184 vs 132 instruments), saving $50,000 annually. Unnecessary clinic visits were reduced by 39% (1.6 vs 1.1 clinic visits per patient) through implementation of a preclinic imaging protocol. There was no difference in mean length of stay after the intervention. Conclusions Comprehensive EVAR delivery redesign leads to cost reduction and waste elimination while preserving quality. Future efforts to achieve more competitive and transparent device pricing will make EVAR more cost neutral and enhance its financial sustainability for health care systems. PMID:25935271

  18. Satellite voice broadcast. Volume 2: System study

    NASA Technical Reports Server (NTRS)

    Bachtell, E. E.; Bettadapur, S. S.; Coyner, J. V.; Farrell, C. E.

    1985-01-01

    The Technical Volume of the Satellite Broadcast System Study is presented. Designs are synthesized for direct sound broadcast satellite systems for HF-, VHF-, L-, and Ku-bands. Methods are developed and used to predict satellite weight, volume, and RF performance for the various concepts considered. Cost and schedule risk assessments are performed to predict time and cost required to implement selected concepts. Technology assessments and tradeoffs are made to identify critical enabling technologies that require development to bring technical risk to acceptable levels for full scale development.

  19. Satellite power system (SPS) concept definition study. Volume 3: Experimental verification definition

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    An evolutionary Satellite Power Systems development plan was prepared. Planning analysis was directed toward the evolution of a scenario that met the stated objectives, was technically possible and economically attractive, and took into account constraining considerations, such as requirements for very large scale end-to-end demonstration in a compressed time frame, the relative cost/technical merits of ground testing versus space testing, and the need for large mass flow capability to low Earth orbit and geosynchronous orbit at reasonable cost per pound.

  20. Development of an efficient, low cost, small-scale natural gas fuel reformer for residential scale electric power generation. Final report for the period October 1, 1998 - December 31, 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kreutz, Thomas G; Ogden, Joan M

    2000-07-01

    In the final report, we present results from a technical and economic assessment of residential scale PEM fuel cell power systems. The objectives of our study are to conceptually design an inexpensive, small-scale PEMFC-based stationary power system that converts natural gas to both electricity and heat, and then to analyze the prospective performance and economics of various system configurations. We developed computer models for residential scale PEMFC cogeneration systems to compare various system designs (e.g., steam reforming vs. partial oxidation, compressed vs. atmospheric pressure, etc.) and determine the most technically and economically attractive system configurations at various scales (e.g., singlemore » family, residential, multi-dwelling, neighborhood).« less

  1. Robotic-Assisted Versus Manual Prostatic Arterial Embolization for Benign Prostatic Hyperplasia: A Comparative Analysis.

    PubMed

    Bagla, Sandeep; Smirniotopoulos, John; Orlando, Julie C; Piechowiak, Rachel

    2017-03-01

    Prostatic artery embolization (PAE) is a safe and efficacious procedure for benign prostatic hyperplasia (BPH), though is technically challenging. We present our experience of technical and clinical outcomes of robotic and manual PAE in patients with BPH. IRB-approved retrospective study of 40 consecutive patients 49-81 years old with moderate or severe grade BPH from May 2014 to July 2015: 20 robotic-assisted PAE (group 1), 20 manual PAE (group 2). Robotic-assisted PAE was performed using the Magellan Robotic System. American Urological Association (AUA-SI) score, cost, technical and clinical success, radiation dose, fluoroscopy, and procedure time were reviewed. Statistical analysis was performed within and between each group using paired t test and one-way analysis of variance respectively, at 1 and 3 months. No significant baseline differences in age and AUA-SI between groups. Technical success was 100% (group 1) and 95% (group 2). One unsuccessful subject from group 2 returned for a successful embolization using robotic assistance. Fluoroscopy and procedural times were similar between groups, with a non-significant lower patient radiation dose in group 1 (30,632.8 mGy/cm 2 vs 35,890.9, p = 0.269). Disposable cost was significantly different between groups with the robotic-assisted PAE incurring a higher cost (group 1 $4530.2; group 2 $1588.5, p < 0.0001). Clinical improvement was significant in both arms at 3 months: group 1 mean change in AUA-SI of 8.3 (p = 0.006), group 2: 9.6 (p < 0.0001). No minor or major complications occurred. Robotic-assisted PAE offers technical success comparable to manual PAE, with similar clinical improvement with an increased cost.

  2. The Birth of a New Vocational-Technical Center. National Vocational-Technical Facility Planning Conference (Las Vegas, Nevada, May, 1967).

    ERIC Educational Resources Information Center

    Farnsworth, Clayton

    The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…

  3. High-power CO laser with RF discharge for isotope separation employing condensation repression

    NASA Astrophysics Data System (ADS)

    Baranov, I. Ya.; Koptev, A. V.

    2008-10-01

    High-power CO laser can be the effective tool in such applications as isotope separation using the free-jet CRISLA method. The way of transfer from CO small-scale experimental installation to industrial high-power CO lasers is proposed through the use of a low-current radio-frequency (RF) electric discharge in a supersonic stream without an electron gun. The calculation model of scaling CO laser with RF discharge in supersonic stream was developed. The developed model allows to calculate parameters of laser installation and optimize them with the purpose of reception of high efficiency and low cost of installation as a whole. The technical decision of industrial CO laser for isotope separation employing condensation repression is considered. The estimated cost of laser is some hundred thousand dollars USA and small sizes of laser head give possibility to install it in any place.

  4. Verification of image orthorectification techniques for low-cost geometric inspection of masonry arch bridges

    NASA Astrophysics Data System (ADS)

    González-Jorge, Higinio; Riveiro, Belén; Varela, María; Arias, Pedro

    2012-07-01

    A low-cost image orthorectification tool based on the utilization of compact cameras and scale bars is developed to obtain the main geometric parameters of masonry bridges for inventory and routine inspection purposes. The technique is validated in three different bridges by comparison with laser scanning data. The surveying process is very delicate and must make a balance between working distance and angle. Three different cameras are used in the study to establish the relationship between the error and the camera model. Results depict nondependence in error between the length of the bridge element, the type of bridge, and the type of element. Error values for all the cameras are below 4 percent (95 percent of the data). A compact Canon camera, the model with the best technical specifications, shows an error level ranging from 0.5 to 1.5 percent.

  5. Planning Inmarsat's second generation of spacecraft

    NASA Astrophysics Data System (ADS)

    Williams, W. P.

    1982-09-01

    The next generation of studies of the Inmarsat service are outlined, such as traffic forecasting studies, communications capacity estimates, space segment design, cost estimates, and financial analysis. Traffic forecasting will require future demand estimates, and a computer model has been developed which estimates demand over the Atlantic, Pacific, and Indian ocean regions. Communications estimates are based on traffic estimates, as a model converts traffic demand into a required capacity figure for a given area. The Erlang formula is used, requiring additional data such as peak hour ratios and distribution estimates. Basic space segment technical requirements are outlined (communications payload, transponder arrangements, etc), and further design studies involve such areas as space segment configuration, launcher and spacecraft studies, transmission planning, and earth segment configurations. Cost estimates of proposed design parameters will be performed, but options must be reduced to make construction feasible. Finally, a financial analysis will be carried out in order to calculate financial returns.

  6. Demonstration of the feasibility of automated silicon solar cell fabrication

    NASA Technical Reports Server (NTRS)

    Taylor, W. E.; Schwartz, F. M.

    1975-01-01

    A study effort was undertaken to determine the process, steps and design requirements of an automated silicon solar cell production facility. Identification of the key process steps was made and a laboratory model was conceptually designed to demonstrate the feasibility of automating the silicon solar cell fabrication process. A detailed laboratory model was designed to demonstrate those functions most critical to the question of solar cell fabrication process automating feasibility. The study and conceptual design have established the technical feasibility of automating the solar cell manufacturing process to produce low cost solar cells with improved performance. Estimates predict an automated process throughput of 21,973 kilograms of silicon a year on a three shift 49-week basis, producing 4,747,000 hexagonal cells (38mm/side), a total of 3,373 kilowatts at an estimated manufacturing cost of $0.866 per cell or $1.22 per watt.

  7. Energy Efficiency Potential in the U.S. Single-Family Housing Stock

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, Eric J.; Christensen, Craig B.; Horowitz, Scott G.

    Typical approaches for assessing energy efficiency potential in buildings use a limited number of prototypes, and therefore suffer from inadequate resolution when pass-fail cost-effectiveness tests are applied, which can significantly underestimate or overestimate the economic potential of energy efficiency technologies. This analysis applies a new approach to large-scale residential energy analysis, combining the use of large public and private data sources, statistical sampling, detailed building simulations, and high-performance computing to achieve unprecedented granularity - and therefore accuracy - in modeling the diversity of the single-family housing stock. The result is a comprehensive set of maps, tables, and figures showing themore » technical and economic potential of 50 plus residential energy efficiency upgrades and packages for each state. Policymakers, program designers, and manufacturers can use these results to identify upgrades with the highest potential for cost-effective savings in a particular state or region, as well as help identify customer segments for targeted marketing and deployment. The primary finding of this analysis is that there is significant technical and economic potential to save electricity and on-site fuel use in the single-family housing stock. However, the economic potential is very sensitive to the cost-effectiveness criteria used for analysis. Additionally, the savings of particular energy efficiency upgrades is situation-specific within the housing stock (depending on climate, building vintage, heating fuel type, building physical characteristics, etc.).« less

  8. Solar, Install, Mount, Production, Labor, Equipment Balance of Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gentry, Russell; Al-Haddad, Tristan; Valdes, Francisco

    2015-08-27

    The GTRI led project team in partnership with the DOE, universities, and numerous industry leaders, have advanced the mission of the DOE EERE, the Solar Energy Technologies Program, and the SunShot Initiative by accelerating the research, development, and demonstration of solar PV technologies that provide Extreme Balance of Systems Cost Reductions (BOS-X). The research produced 132 design concepts, resulting in 19 invention disclosures, five patent applications, four 90% pre-commercial designs, and three licensed technologies. Technology practice rights were obtained by an industry partner, and a new solar commercial start-up company was launched in Atlanta as a result of this project.more » Innovations in residential, commercial, and utility scale balance of systems technologies were realized through an unprecedented multi-disciplinary university/industry partnership with over 50 students and 24 faculty members that produced 18 technical publications, a PhD thesis, and two commercially deployed operating prototypes. The technical effectiveness and economic feasibility of the multidisciplinary systems based approach executed by the project team was realized through 1) a comprehensive evaluation of industry, regulatory, and public stakeholder requirements; 2) numerous industry/student/faculty engagements in design studios, technical conferences, and at solar PV installation sites; 3) time and motion studies with domain experts that provided technical data and costs for each phase and component of the solar PV installation processes; 4) extensive wind tunnel and systems engineering modeling; and 5) design, construction, and demonstration of the selected technologies in the field at high profile sites in Atlanta. The SIMPLE BOS project has benefitted the public in the following ways: • Workforce development: The launch of a start-up company to commercialize the DOE funded SIMPLE BoS designs has directly created 9 new jobs in the State of Georgia. As of November 2014, the Georgia solar industry employs 2,890 solar workers, representing a 12.8% growth in employment over 2013 (Solar Jobs Census, 2014). • Growth of the solar industry: The DOE SIMPLE BoS SunShot Award to GTARC accelerated the growth of the solar industry in Georgia, due to the national publicity of the award and the engagement of numerous solar PV manufacturers, designers, and installers on the SIMPLE BoS project. In 2011 less than 50 megawatts of solar PV capacity existed in Georgia; by 2016 Georgia may reach nearly 800 MW of total approved solar capacity with the 2012 Georgia Power Advanced Solar Initiative. • Technical outreach and publications: Georgia Tech has participated in numerous technical symposiums, technology demonstrations, campus solar PV tours, and produced 18 publications for the solar industry and general public. • Cost reductions for consumers: The SIMPLE BoS pre-commercial systems and discoveries enable cost reductions of 50% or more in labor and materials for residential, commercial and utility scale PV installations.« less

  9. From COST 271 to 296 EU actions on ionospheric monitoring and modelling for terrestrial and Earth space radio systems

    NASA Astrophysics Data System (ADS)

    Zolesi, B.; Cander, Lj. R.; Altadill, D.

    The ionospheric community has long been aware that co-operative research on an international basis is essential to deal with temporal and spatial changes in the ionosphere that influence the performance of terrestrial and Earth-space radio systems. The EU COST (Co-operation in the field of Scientific and Technical Research) 271 Action on "Effects of the Upper Atmosphere on Terrestrial and Earth-space Communications" has had during the period of October 2000-August 2004 the following main objectives: (1) to evaluate the influence of upper atmospheric conditions on terrestrial and Earth-space communications, (2) to develop methods and techniques to improve ionospheric models over Europe for telecommunication and navigation applications and (3) to transfer the results to the appropriate radiocommunication study groups of the International Telecommunication Union (ITU-R) and other national and international organizations dealing with the modern communication systems. At the beginning of 2005 the new 296 Action in the COST Telecommunications, Information Science and Technology domain on "Mitigation of Ionospheric Effects on Radio Systems (MIERS)" was approved for the period 2005-2009. The main objectives of the MIERS are: (a) to support and enhanced the existing European facilities for historical and real-time digital ionospheric data collection and exchange; (b) to develop an integrated approach to ionospheric modelling, create the mechanism needed to ingest processed data into models, extend and develop suitable mitigation models and define the protocols needed to link models together; and (c) to strengthen the areas of expertise that already exist by stimulating closer cooperation between scientists and users, focusing the scope of all the previous COST ionospheric related studies to the mitigation of ionospheric effects on radio systems. This paper summarises briefly how the major objectives of the COST271 Action have been achieved and what are the most important activities to be undertaken in the follow-on COST296 Action.

  10. Automated water monitor system field demonstration test report. Volume 2: Technical summary

    NASA Technical Reports Server (NTRS)

    Brooks, R. L.; Jeffers, E. L.; Perreira, J.; Poel, J. D.; Nibley, D.; Nuss, R. H.

    1981-01-01

    The NASA Automatic Water Monitor System was installed in a water reclamation facility to evaluate the technical and cost feasibility of producing high quality reclaimed water. Data gathered during this field demonstration test are reported.

  11. Economic consequences of high throughput maskless lithography

    NASA Astrophysics Data System (ADS)

    Hartley, John G.; Govindaraju, Lakshmi

    2005-11-01

    Many people in the semiconductor industry bemoan the high costs of masks and view mask cost as one of the significant barriers to bringing new chip designs to market. All that is needed is a viable maskless technology and the problem will go away. Numerous sites around the world are working on maskless lithography but inevitably, the question asked is "Wouldn't a one wafer per hour maskless tool make a really good mask writer?" Of course, the answer is yes, the hesitation you hear in the answer isn't based on technology concerns, it's financial. The industry needs maskless lithography because mask costs are too high. Mask costs are too high because mask pattern generators (PG's) are slow and expensive. If mask PG's become much faster, mask costs go down, the maskless market goes away and the PG supplier is faced with an even smaller tool demand from the mask shops. Technical success becomes financial suicide - or does it? In this paper we will present the results of a model that examines some of the consequences of introducing high throughput maskless pattern generation. Specific features in the model include tool throughput for masks and wafers, market segmentation by node for masks and wafers and mask cost as an entry barrier to new chip designs. How does the availability of low cost masks and maskless tools affect the industries tool makeup and what is the ultimate potential market for high throughput maskless pattern generators?

  12. Design study of wind turbines 50 kW to 3000 kW for electric utility applications. Volume 2: Analysis and design

    NASA Technical Reports Server (NTRS)

    1976-01-01

    All possible overall system configurations, operating modes, and subsystem concepts for a wind turbine configuration for cost effective generation of electrical power were evaluated for both technical feasibility and compatibility with utility networks, as well as for economic attractiveness. A design optimization computer code was developed to determine the cost sensitivity of the various design features, and thus establish the configuration and design conditions that would minimize the generated energy costs. The preliminary designs of both a 500 kW unit and a 1500 kW unit operating in a 12 mph and 18 mph median wind speed respectively, were developed. The various design features and components evaluated are described, and the rationale employed to select the final design configuration is given. All pertinent technical performance data and component cost data is included. The costs of all major subassemblies are estimated and the resultant energy costs for both the 500 kW and 1500 kW units are calculated.

  13. Computational Methods to Assess the Production Potential of Bio-Based Chemicals.

    PubMed

    Campodonico, Miguel A; Sukumara, Sumesh; Feist, Adam M; Herrgård, Markus J

    2018-01-01

    Elevated costs and long implementation times of bio-based processes for producing chemicals represent a bottleneck for moving to a bio-based economy. A prospective analysis able to elucidate economically and technically feasible product targets at early research phases is mandatory. Computational tools can be implemented to explore the biological and technical spectrum of feasibility, while constraining the operational space for desired chemicals. In this chapter, two different computational tools for assessing potential for bio-based production of chemicals from different perspectives are described in detail. The first tool is GEM-Path: an algorithm to compute all structurally possible pathways from one target molecule to the host metabolome. The second tool is a framework for Modeling Sustainable Industrial Chemicals production (MuSIC), which integrates modeling approaches for cellular metabolism, bioreactor design, upstream/downstream processes, and economic impact assessment. Integrating GEM-Path and MuSIC will play a vital role in supporting early phases of research efforts and guide the policy makers with decisions, as we progress toward planning a sustainable chemical industry.

  14. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 6: IPAD system development and operation

    NASA Technical Reports Server (NTRS)

    Redhed, D. D.; Tripp, L. L.; Kawaguchi, A. S.; Miller, R. E., Jr.

    1973-01-01

    The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.

  15. Energy technologies evaluated against climate targets using a cost and carbon trade-off curve.

    PubMed

    Trancik, Jessika E; Cross-Call, Daniel

    2013-06-18

    Over the next few decades, severe cuts in emissions from energy will be required to meet global climate-change mitigation goals. These emission reductions imply a major shift toward low-carbon energy technologies, and the economic cost and technical feasibility of mitigation are therefore highly dependent upon the future performance of energy technologies. However, existing models do not readily translate into quantitative targets against which we can judge the dynamic performance of technologies. Here, we present a simple, new model for evaluating energy-supply technologies and their improvement trajectories against climate-change mitigation goals. We define a target for technology performance in terms of the carbon intensity of energy, consistent with emission reduction goals, and show how the target depends upon energy demand levels. Because the cost of energy determines the level of adoption, we then compare supply technologies to one another and to this target based on their position on a cost and carbon trade-off curve and how the position changes over time. Applying the model to U.S. electricity, we show that the target for carbon intensity will approach zero by midcentury for commonly cited emission reduction goals, even under a high demand-side efficiency scenario. For Chinese electricity, the carbon intensity target is relaxed and less certain because of lesser emission reductions and greater variability in energy demand projections. Examining a century-long database on changes in the cost-carbon space, we find that the magnitude of changes in cost and carbon intensity that are required to meet future performance targets is not unprecedented, providing some evidence that these targets are within engineering reach. The cost and carbon trade-off curve can be used to evaluate the dynamic performance of existing and new technologies against climate-change mitigation goals.

  16. Economic analyses to support decisions about HPV vaccination in low- and middle-income countries: a consensus report and guide for analysts.

    PubMed

    Jit, Mark; Levin, Carol; Brisson, Marc; Levin, Ann; Resch, Stephen; Berkhof, Johannes; Kim, Jane; Hutubessy, Raymond

    2013-01-30

    Low- and middle-income countries need to consider economic issues such as cost-effectiveness, affordability and sustainability before introducing a program for human papillomavirus (HPV) vaccination. However, many such countries lack the technical capacity and data to conduct their own analyses. Analysts informing policy decisions should address the following questions: 1) Is an economic analysis needed? 2) Should analyses address costs, epidemiological outcomes, or both? 3) If costs are considered, what sort of analysis is needed? 4) If outcomes are considered, what sort of model should be used? 5) How complex should the analysis be? 6) How should uncertainty be captured? 7) How should model results be communicated? Selecting the appropriate analysis is essential to ensure that all the important features of the decision problem are correctly represented, but that the analyses are not more complex than necessary. This report describes the consensus of an expert group convened by the World Health Organization, prioritizing key issues to be addressed when considering economic analyses to support HPV vaccine introduction in these countries.

  17. Evaluative studies in nuclear medicine research: emission computed tomography assessment. Final report, January 1-December 31, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Potchen, E.J.; Harris, G.I.; Gift, D.A.

    The report provides information on an assessment of the potential short and long term benefits of emission computed tomography (ECT) in biomedical research and patient care. Work during the past year has been augmented by the development and use of an opinion survey instrument to reach a wider representation of knowledgeable investigators and users of this technology. This survey instrument is reproduced in an appendix. Information derived from analysis of the opinion survey, and used in conjunction with results of independent staff studies of available sources, provides the basis for the discussions given in following sections of PET applications inmore » the brain, of technical factors, and of economic implications. Projections of capital and operating costs on a per study basis were obtained from a computerized, pro forma accounting model and are compared with the survey cost estimates for both research and clinical modes of application. The results of a cash-flow model analysis of the relationship between projected economic benefit of PET research to disease management and the costs associated with such research are presented and discussed.« less

  18. The Effects of Rising Interest Rates on Electric Utility Stock Prices: Regulatory Considerations and Approaches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kihm, Steve; Satchwell, Andrew; Cappers, Peter

    This technical brief identifies conditions under which utility regulators should consider implementing policy approaches that seek to mitigate negative outcomes due to an increase in interest rates. Interest rates are a key factor in determining a utility’s cost of equity and investors find value when returns exceed the cost of equity. Through historical observations of periods of rising and falling interest rates and application of a pro forma financial tool, we identify the key drivers of utility stock valuations and estimate the degree to which those valuations might be affected by increasing interest rates.3 We also analyze the efficacy ofmore » responses by utility regulators to mitigate potential negative financial impacts. We find that regulators have several possible approaches to mitigate a decline in value in an environment of increasing interest rates, though regulators must weigh the tradeoffs of improving investor value with potential increases in customer costs. Furthermore, the range of approaches reflects today’s many different electric utility regulatory models and regulatory responses to a decline in investor value will fit within state-specific models.« less

  19. Implications of biomass pretreatment to cost and carbon emissions: case study of rice straw and Pennisetum in Taiwan.

    PubMed

    Chiueh, Pei-Te; Lee, Kun-Chou; Syu, Fu-Sians; Lo, Shang-Lien

    2012-03-01

    The purpose of this study was to explore the impact of feedstock collection and torrefaction pretreatment on the efficiency of a biomass co-firing system. Considering the transformation of existing municipal solid waste incinerators, several scenarios in which biomass supply chains depend on centralised pretreatment and transportation alternatives are presented. The cost, net energy output, and greenhouse gas effects of these scenarios were analysed using a spreadsheet model. Based on the Taoyuan County case in Taiwan, the mitigation costs of carbon emissions for rice straw and Pennisetum are 77.0 $/Mg CO(2) and 63.8 $/Mg CO(2), respectively. Results indicate that transporting feedstock from its source to the pretreatment and co-firing stations contributes the most to logistical costs for both straw and Pennisetum, regardless of whether torrefaction was adopted. Nonetheless, torrefaction requires more demonstrated cases at various scales to obtain the technical and economic data required for further analysis. Copyright © 2012 Elsevier Ltd. All rights reserved.

  20. Cost accounting in radiation oncology: a computer-based model for reimbursement.

    PubMed

    Perez, C A; Kobeissi, B; Smith, B D; Fox, S; Grigsby, P W; Purdy, J A; Procter, H D; Wasserman, T H

    1993-04-02

    The skyrocketing cost of medical care in the United States has resulted in multiple efforts in cost containment. The present work offers a rational computer-based cost accounting approach to determine the actual use of resources in providing a specific service in a radiation oncology center. A procedure-level cost accounting system was developed by using recorded information on actual time and effort spent by individual staff members performing various radiation oncology procedures, and analyzing direct and indirect costs related to staffing (labor), facilities and equipment, supplies, etc. Expenditures were classified as direct or indirect and fixed or variable. A relative value unit was generated to allocate specific cost factors to each procedure. Different costs per procedure were identified according to complexity. Whereas there was no significant difference in the treatment time between low-energy (4 and 6 MV) or high-energy (18 MV) accelerators, there were significantly higher costs identified in the operation of a high-energy linear accelerator, a reflection of initial equipment investment, quality assurance and calibration procedures, maintenance costs, service contract, and replacement parts. Utilization of resources was related to the complexity of the procedures performed and whether the treatments were delivered to inpatients or outpatients. In analyzing time motion for physicians and other staff, it was apparent that a greater effort must be made to train the staff to accurately record all times involved in a given procedure, and it is strongly recommended that each institution perform its own time motion studies to more accurately determine operating costs. Sixty-six percent of our facility's global costs were for labor, 20% for other operating expenses, 10% for space, and 4% for equipment. Significant differences were noted in the cost allocation for professional or technical functions, as labor, space, and equipment costs are higher in the latter. External beam treatment-related procedures accounted for more than 50% of all technical and professional revenues, simulation for 8% to 10%, and other physics/dosimetry procedures for 11% to 14% of revenues. Some discrepancies were identified between the actual cost and level of reimbursement of various procedures. Details are described in the manuscript. It is imperative to develop an equitable reimbursement system for radiation oncology services, based on cost accounting and other measures that may enhance productivity and reduce the cost per procedure unit, while at the same time preserving the highest quality of service provided to patients.

  1. Cost Study of Educational Media Systems and Their Equipment Components. Volume II, Technical Report. Final Report.

    ERIC Educational Resources Information Center

    General Learning Corp., Washington, DC.

    A common instructional task and a set of educational environments are hypothesized for analysis of media cost data. The analytic structure may be conceptulized as a three-dimensional matrix: the first vector separates costs into production, distribution, and reception; the second vector delineates capital (initial) and operating (annual) costs;…

  2. 77 FR 4632 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... aggregate IR&D costs or the costs of an individual IR&D project. The threshold for triggering the reporting... Agency auditor to support the allowability of the costs. Contractors that do not meet the threshold as a... provide in-process information from IR&D projects, for which reimbursement, as an allowable indirect cost...

  3. 7 CFR 1450.213 - Levels and rates for establishment payments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... (a) CCC will pay not more than 75 percent of the actual or average cost (whichever is lower) of... stewardship plan, or equivalent plan. (b) The average cost of performing a practice may be determined by CCC based on recommendations from the State Technical Committee. Such cost may be the average cost in a...

  4. Barriers to Electronic Health Record Adoption: a Systematic Literature Review.

    PubMed

    Kruse, Clemens Scott; Kristof, Caitlin; Jones, Beau; Mitchell, Erica; Martinez, Angelica

    2016-12-01

    Federal efforts and local initiatives to increase adoption and use of electronic health records (EHRs) continue, particularly since the enactment of the Health Information Technology for Economic and Clinical Health (HITECH) Act. Roughly one in four hospitals not adopted even a basic EHR system. A review of the barriers may help in understanding the factors deterring certain healthcare organizations from implementation. We wanted to assemble an updated and comprehensive list of adoption barriers of EHR systems in the United States. Authors searched CINAHL, MEDLINE, and Google Scholar, and accepted only articles relevant to our primary objective. Reviewers independently assessed the works highlighted by our search and selected several for review. Through multiple consensus meetings, authors tapered articles to a final selection most germane to the topic (n = 27). Each article was thoroughly examined by multiple authors in order to achieve greater validity. Authors identified 39 barriers to EHR adoption within the literature selected for the review. These barriers appeared 125 times in the literature; the most frequently mentioned barriers were regarding cost, technical concerns, technical support, and resistance to change. Despite federal and local incentives, the initial cost of adopting an EHR is a common existing barrier. The other most commonly mentioned barriers include technical support, technical concerns, and maintenance/ongoing costs. Policy makers should consider incentives that continue to reduce implementation cost, possibly aimed more directly at organizations that are known to have lower adoption rates, such as small hospitals in rural areas.

  5. Conversion of transuranic waste to low level waste by decontamination: a technical and economic evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, R.P.; Hazelton, R.F.

    1984-12-01

    A study was conducted to evaluate the technical and economic feasibility of using in-situ decontamination techniques to convert glove boxes and other large TRU-contaminated components directly into LLW. The results of the technical evaluation indicate that in-situ decontamination of these types of components to non-TRU levels is technically feasible. Applicable decontamination techniques include electropolishing, hand scrubbing, chemical washes/sprays, strippable coatings and Freon spray-cleaning. The removal of contamination from crevices and other holdup areas remains a problem, but may be solved through further advances in decontamination technology. Also, the increase in the allowable maximum TRU level from 10 nCi/g to 100more » nCi/g as defined in DOE Order 5820.2 reduces the removal requirement and facilitates measurement of the remaining quantities. The major emphasis of the study was on a cost/benefit evaluation that included a review and update of previous analyses and evaluations of TRU-waste volume reduction and conversion options. The results of the economic evaluation show, for the assumptions used, that there is a definite cost incentive to size reduce large components, and that decontamination of sectioned material has become cost competitive with the size reduction options. In-situ decontamination appears to be the lowest cost option when based on routine-type operations conducted by well-trained and properly equipped personnel. 16 references, 1 figure, 7 tables.« less

  6. 48 CFR 31.205-1 - Public relations and advertising costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... employees engaged in the functions and activities identified in paragraphs (a) and (b) of this subsection... closings or openings, employee layoffs or rehires, financial information, etc. (3) Costs of participation... the event is other than dissemination of technical information or stimulation of production. (4) Costs...

  7. 48 CFR 2937.602 - Elements of performance-based contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...

  8. Cost Benefit Studies. Final Report.

    ERIC Educational Resources Information Center

    Weiner, Arthur; Marson, Arthur A.

    This document applies Dr. Mehar Aurora's method for conducting cost benefit studies to the Food Manufacturing Technology-Dairy and the Food Manufacturing Technology-Canning and Freezing programs offered by the Moraine Park Technical Institute. Costs to individual students enrolled in the programs include tuition, fees, housing, travel, books,…

  9. Analytical Components of the Benefits and Costs of the Clean Air Act 1990-2020, the Second Prospective Study

    EPA Pesticide Factsheets

    The major analytical components of the Second Prospective Study are shown on this page. For other major components of the study, supporting technical reports are available which provide additional technical information.

  10. 77 FR 40026 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... and contractor logistics, Quality Assurance Team support services, engineering and technical support..., engineering and technical support, and other related elements of program support. The estimated cost is $49..., maintenance, or training is Confidential. Reverse engineering could reveal Confidential information...

  11. Approach of technical decision-making by element flow analysis and Monte-Carlo simulation of municipal solid waste stream.

    PubMed

    Tian, Bao-Guo; Si, Ji-Tao; Zhao, Yan; Wang, Hong-Tao; Hao, Ji-Ming

    2007-01-01

    This paper deals with the procedure and methodology which can be used to select the optimal treatment and disposal technology of municipal solid waste (MSW), and to provide practical and effective technical support to policy-making, on the basis of study on solid waste management status and development trend in China and abroad. Focusing on various treatment and disposal technologies and processes of MSW, this study established a Monte-Carlo mathematical model of cost minimization for MSW handling subjected to environmental constraints. A new method of element stream (such as C, H, O, N, S) analysis in combination with economic stream analysis of MSW was developed. By following the streams of different treatment processes consisting of various techniques from generation, separation, transfer, transport, treatment, recycling and disposal of the wastes, the element constitution as well as its economic distribution in terms of possibility functions was identified. Every technique step was evaluated economically. The Mont-Carlo method was then conducted for model calibration. Sensitivity analysis was also carried out to identify the most sensitive factors. Model calibration indicated that landfill with power generation of landfill gas was economically the optimal technology at the present stage under the condition of more than 58% of C, H, O, N, S going to landfill. Whether or not to generate electricity was the most sensitive factor. If landfilling cost increases, MSW separation treatment was recommended by screening first followed with incinerating partially and composting partially with residue landfilling. The possibility of incineration model selection as the optimal technology was affected by the city scale. For big cities and metropolitans with large MSW generation, possibility for constructing large-scale incineration facilities increases, whereas, for middle and small cities, the effectiveness of incinerating waste decreases.

  12. A process economic assessment of hydrocarbon biofuels production using chemoautotrophic organisms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khan, NE; Myers, JA; Tuerk, AL

    Economic analysis of an ARPA-e Electrofuels (http://arpa-e.energy.gov/?q=arpa-e-programs/electrofuels) process is presented, utilizing metabolically engineered Rhodobacter capsulatus or Ralstonia eutropha to produce the C30+ hydrocarbon fuel, botryococcene, from hydrogen, carbon dioxide, and oxygen. The analysis is based on an Aspen plus (R) bioreactor model taking into account experimentally determined Rba. capsulatus and Rls. eutropha growth and maintenance requirements, reactor residence time, correlations for gas-liquid mass-transfer coefficient, gas composition, and specific cellular fuel productivity. Based on reactor simulation results encompassing technically relevant parameter ranges, the capital and operating costs of the process were estimated for 5000 bbl-fuel/day plant and used to predict fuelmore » cost. Under the assumptions used in this analysis and crude oil prices, the Levelized Cost of Electricity (LCOE) required for economic feasibility must be less than 2(sic)/kWh. While not feasible under current market prices and costs, this work identifies key variables impacting process cost and discusses potential alternative paths toward economic feasibility. (C) 2014 Elsevier Ltd. All rights reserved.« less

  13. Systems Engineering and Integration (SE and I)

    NASA Technical Reports Server (NTRS)

    Chevers, ED; Haley, Sam

    1990-01-01

    The issue of technology advancement and future space transportation vehicles is addressed. The challenge is to develop systems which can be evolved and improved in small incremental steps where each increment reduces present cost, improves, reliability, or does neither but sets the stage for a second incremental upgrade that does. Future requirements are interface standards for commercial off the shelf products to aid in the development of integrated facilities; enhanced automated code generation system slightly coupled to specification and design documentation; modeling tools that support data flow analysis; and shared project data bases consisting of technical characteristics cast information, measurement parameters, and reusable software programs. Topics addressed include: advanced avionics development strategy; risk analysis and management; tool quality management; low cost avionics; cost estimation and benefits; computer aided software engineering; computer systems and software safety; system testability; and advanced avionics laboratories - and rapid prototyping. This presentation is represented by viewgraphs only.

  14. Observations on Complexity and Costs for Over Three Decades of Communications Satellites

    NASA Astrophysics Data System (ADS)

    Bearden, David A.

    2002-01-01

    This paper takes an objective look at approximately thirty communications satellites built over three decades using a complexity index as an economic model. The complexity index is derived from a number of technical parameters including dry mass, end-of-life- power, payload type, communication bands, spacecraft lifetime, and attitude control approach. Complexity is then plotted versus total satellite cost and development time (defined as contract start to first launch). A comparison of the relative cost and development time for various classes of communications satellites and conclusions regarding dependence on system complexity are presented. Observations regarding inherent differences between commercially acquired systems and those procured by government organizations are also presented. A process is described where a new communications system in the formative stage may be compared against similarly "complex" missions of the recent past to balance risk within allotted time and funds. 1

  15. Harnessing expert knowledge: Defining a Bayesian network decision model with limited data-Model structure for the vibration qualification problem

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rizzo, Davinia B.; Blackburn, Mark R.

    As systems become more complex, systems engineers rely on experts to inform decisions. There are few experts and limited data in many complex new technologies. This challenges systems engineers as they strive to plan activities such as qualification in an environment where technical constraints are coupled with the traditional cost, risk, and schedule constraints. Bayesian network (BN) models provide a framework to aid systems engineers in planning qualification efforts with complex constraints by harnessing expert knowledge and incorporating technical factors. By quantifying causal factors, a BN model can provide data about the risk of implementing a decision supplemented with informationmore » on driving factors. This allows a systems engineer to make informed decisions and examine “what-if” scenarios. This paper discusses a novel process developed to define a BN model structure based primarily on expert knowledge supplemented with extremely limited data (25 data sets or less). The model was developed to aid qualification decisions—specifically to predict the suitability of six degrees of freedom (6DOF) vibration testing for qualification. The process defined the model structure with expert knowledge in an unbiased manner. Finally, validation during the process execution and of the model provided evidence the process may be an effective tool in harnessing expert knowledge for a BN model.« less

  16. Harnessing expert knowledge: Defining a Bayesian network decision model with limited data-Model structure for the vibration qualification problem

    DOE PAGES

    Rizzo, Davinia B.; Blackburn, Mark R.

    2018-03-30

    As systems become more complex, systems engineers rely on experts to inform decisions. There are few experts and limited data in many complex new technologies. This challenges systems engineers as they strive to plan activities such as qualification in an environment where technical constraints are coupled with the traditional cost, risk, and schedule constraints. Bayesian network (BN) models provide a framework to aid systems engineers in planning qualification efforts with complex constraints by harnessing expert knowledge and incorporating technical factors. By quantifying causal factors, a BN model can provide data about the risk of implementing a decision supplemented with informationmore » on driving factors. This allows a systems engineer to make informed decisions and examine “what-if” scenarios. This paper discusses a novel process developed to define a BN model structure based primarily on expert knowledge supplemented with extremely limited data (25 data sets or less). The model was developed to aid qualification decisions—specifically to predict the suitability of six degrees of freedom (6DOF) vibration testing for qualification. The process defined the model structure with expert knowledge in an unbiased manner. Finally, validation during the process execution and of the model provided evidence the process may be an effective tool in harnessing expert knowledge for a BN model.« less

  17. Economic decision making and the application of nonparametric prediction models

    USGS Publications Warehouse

    Attanasi, E.D.; Coburn, T.C.; Freeman, P.A.

    2007-01-01

    Sustained increases in energy prices have focused attention on gas resources in low permeability shale or in coals that were previously considered economically marginal. Daily well deliverability is often relatively small, although the estimates of the total volumes of recoverable resources in these settings are large. Planning and development decisions for extraction of such resources must be area-wide because profitable extraction requires optimization of scale economies to minimize costs and reduce risk. For an individual firm the decision to enter such plays depends on reconnaissance level estimates of regional recoverable resources and on cost estimates to develop untested areas. This paper shows how simple nonparametric local regression models, used to predict technically recoverable resources at untested sites, can be combined with economic models to compute regional scale cost functions. The context of the worked example is the Devonian Antrim shale gas play, Michigan Basin. One finding relates to selection of the resource prediction model to be used with economic models. Models which can best predict aggregate volume over larger areas (many hundreds of sites) may lose granularity in the distribution of predicted volumes at individual sites. This loss of detail affects the representation of economic cost functions and may affect economic decisions. Second, because some analysts consider unconventional resources to be ubiquitous, the selection and order of specific drilling sites may, in practice, be determined by extraneous factors. The paper also shows that when these simple prediction models are used to strategically order drilling prospects, the gain in gas volume over volumes associated with simple random site selection amounts to 15 to 20 percent. It also discusses why the observed benefit of updating predictions from results of new drilling, as opposed to following static predictions, is somewhat smaller. Copyright 2007, Society of Petroleum Engineers.

  18. Costs and Returns for Investments in Technical Schooling by a Group of North Carolina High School Graduates. Economics Research Report No. 5

    ERIC Educational Resources Information Center

    Carroll, Adger B.; Ihnen, Loren A.

    Personal, educational, employment, and earnings data were collected from 45 matched pairs, each pair consisting of a Gaston Technical Institute graduate and a high school classmate who did not engage in post secondary education. The objective of the study was to estimate the functional relationship between 2 years of technical schooling and the…

  19. Decomposing Cost Efficiency in Regional Long-term Care Provision in Japan

    PubMed Central

    Yamauchi, Yasuhiro

    2016-01-01

    Many developed countries face a growing need for long-term care provision because of population ageing. Japan is one such example, given its population's longevity and low birth rate. In this study, we examine the efficiency of Japan's regional long-term care system in FY2010 by performing a data envelopment analysis, a non-parametric frontier approach, on prefectural data and separating cost efficiency into technical, allocative, and price efficiencies under different average unit costs across regions. In doing so, we elucidate the structure of cost inefficiency by incorporating a method for restricting weight flexibility to avoid unrealistic concerns arising from zero optimal weight. The results indicate that technical inefficiency accounts for the highest share of losses, followed by price inefficiency and allocation inefficiency. Moreover, the majority of technical inefficiency losses stem from labor costs, particularly those for professional caregivers providing institutional services. We show that the largest share of allocative inefficiency losses can also be traced to labor costs for professional caregivers providing institutional services, while the labor provision of in-home care services shows an efficiency gain. However, although none of the prefectures gains efficiency by increasing the number of professional caregivers for institutional services, quite a few prefectures would gain allocative efficiency by increasing capital inputs for institutional services. These results indicate that preferred policies for promoting efficiency might vary from region to region, and thus, policy implications should be drawn with care. PMID:26493427

  20. Rooftop Energy Potential of Low Income Communities in America REPLICA

    DOE Data Explorer

    Mooney, Meghan (ORCID:0000000309406958); Sigrin, Ben

    1970-01-01

    The Rooftop Energy Potential of Low Income Communities in America REPLICA data set provides estimates of residential rooftop solar technical potential at the tract-level with emphasis on estimates for Low and Moderate Income LMI populations. In addition to technical potential REPLICA is comprised of 10 additional datasets at the tract-level to provide socio-demographic and market context. The model year vintage of REPLICA is 2015. The LMI solar potential estimates are made at the tract level grouped by Area Median Income AMI income tenure and building type. These estimates are based off of LiDAR data of 128 metropolitan areas statistical modeling and ACS 2011-2015 demographic data. The remaining datasets are supplemental datasets that can be used in conjunction with the technical potential data for general LMI solar analysis planning and policy making. The core dataset is a wide-format CSV file seeds_ii_replica.csv that can be tagged to a tract geometry using the GEOID or GISJOIN fields. In addition users can download geographic shapefiles for the main or supplemental datasets. This dataset was generated as part of the larger NREL-led SEEDSII Solar Energy Evolution and Diffusion Studies project and specifically for the NREL technical report titled Rooftop Solar Technical Potential for Low-to-Moderate Income Households in the United States by Sigrin and Mooney 2018. This dataset is intended to give researchers planners advocates and policy-makers access to credible data to analyze low-income solar issues and potentially perform cost-benefit analysis for program design. To explore the data in an interactive web mapping environment use the NREL SolarForAll app.

  1. Information transfer satellite concept study. Volume 4: computer manual

    NASA Technical Reports Server (NTRS)

    Bergin, P.; Kincade, C.; Kurpiewski, D.; Leinhaupel, F.; Millican, F.; Onstad, R.

    1971-01-01

    The Satellite Telecommunications Analysis and Modeling Program (STAMP) provides the user with a flexible and comprehensive tool for the analysis of ITS system requirements. While obtaining minimum cost design points, the program enables the user to perform studies over a wide range of user requirements and parametric demands. The program utilizes a total system approach wherein the ground uplink and downlink, the spacecraft, and the launch vehicle are simultaneously synthesized. A steepest descent algorithm is employed to determine the minimum total system cost design subject to the fixed user requirements and imposed constraints. In the process of converging to the solution, the pertinent subsystem tradeoffs are resolved. This report documents STAMP through a technical analysis and a description of the principal techniques employed in the program.

  2. Advanced space power requirements and techniques. Task 1: Mission projections and requirements. Volume 1: Technical report

    NASA Technical Reports Server (NTRS)

    Wolfe, M. G.

    1978-01-01

    The objectives of this study were to: (1) develop projections of the NASA, DoD, and civil space power requirements for the 1980-1995 time period; (2) identify specific areas of application and space power subsystem type needs for each prospective user; (3) document the supporting and historical base, including relevant cost related measures of performance; and (4) quantify the benefits of specific technology projection advancements. The initial scope of the study included: (1) construction of likely models for NASA, DoD, and civil space systems; (2) generation of a number of future scenarios; (3) extraction of time phased technology requirements based on the scenarios; and (4) cost/benefit analyses of some of the technologies identified.

  3. Advances in miniature spectrometer and sensor development

    NASA Astrophysics Data System (ADS)

    Malinen, Jouko; Rissanen, Anna; Saari, Heikki; Karioja, Pentti; Karppinen, Mikko; Aalto, Timo; Tukkiniemi, Kari

    2014-05-01

    Miniaturization and cost reduction of spectrometer and sensor technologies has great potential to open up new applications areas and business opportunities for analytical technology in hand held, mobile and on-line applications. Advances in microfabrication have resulted in high-performance MEMS and MOEMS devices for spectrometer applications. Many other enabling technologies are useful for miniature analytical solutions, such as silicon photonics, nanoimprint lithography (NIL), system-on-chip, system-on-package techniques for integration of electronics and photonics, 3D printing, powerful embedded computing platforms, networked solutions as well as advances in chemometrics modeling. This paper will summarize recent work on spectrometer and sensor miniaturization at VTT Technical Research Centre of Finland. Fabry-Perot interferometer (FPI) tunable filter technology has been developed in two technical versions: Piezoactuated FPIs have been applied in miniature hyperspectral imaging needs in light weight UAV and nanosatellite applications, chemical imaging as well as medical applications. Microfabricated MOEMS FPIs have been developed as cost-effective sensor platforms for visible, NIR and IR applications. Further examples of sensor miniaturization will be discussed, including system-on-package sensor head for mid-IR gas analyzer, roll-to-roll printed Surface Enhanced Raman Scattering (SERS) technology as well as UV imprinted waveguide sensor for formaldehyde detection.

  4. Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments

    NASA Astrophysics Data System (ADS)

    Holloman, Sherrica S.

    With pressure on the U.S. Defense Acquisition System (DAS) to reduce cost overruns and schedule delays, system engineers' performance is only as good as their tools. Recent literature details a need for 1) objective, analytical risk quantification methodologies over traditional subjective qualitative methods -- such as, expert judgment, and 2) mathematically rigorous system-level maturity assessments. The Mahafza, Componation, and Tippett (2005) Technology Performance Risk Index (TPRI) ties the assessment of technical performance to the quantification of risk of unmet performance; however, it is structured for component- level data as input. This study's aim is to establish a modified TPRI with systems-level data as model input, and then validate the modified index with actual system-level data from the Department of Defense's (DoD) Major Defense Acquisition Programs (MDAPs). This work's contribution is the establishment and validation of the System-level Performance Risk Index (SPRI). With the introduction of the SPRI, system-level metrics are better aligned, allowing for better assessment, tradeoff and balance of time, performance and cost constraints. This will allow system engineers and program managers to ultimately make better-informed system-level technical decisions throughout the development phase.

  5. Techno-Economic Analysis of Indian Draft Standard Levels for RoomAir Conditioners

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McNeil, Michael A.; Iyer, Maithili

    The Indian Bureau of Energy Efficiency (BEE) finalized its first set of efficiency standards and labels for room air conditioners in July of 2006. These regulations followed soon after the publication of levels for frost-free refrigerators in the same year. As in the case of refrigerators, the air conditioner program introduces Minimum Efficiency Performance Standards (MEPS) and comparative labels simultaneously, with levels for one to five stars. Also like the refrigerator program, BEE defined several successive program phases of increasing stringency. In support of BEE's refrigerator program, Lawrence Berkeley National Laboratory (LBNL) produced an analysis of national impacts of standardsmore » in collaboration with the Collaborative Labeling and Standards Program (CLASP). That analysis drew on LBNL's experience with standards programs in the United States, as well as many other countries. Subsequently, as part of the process for setting optimal levels for air conditioner regulations, CLASP commissioned LBNL to provide support to BEE in the form of a techno-economic evaluation of air conditioner efficiency technologies. This report describes the methodology and results of this techno-economic evaluation. The analysis consists of three components: (1) Cost effectiveness to consumers of efficiency technologies relative to current baseline. (2) Impacts on the current market from efficiency regulations. (3) National energy and financial impacts. The analysis relied on detailed and up-to-date technical data made available by BEE and industry representatives. Technical parameters were used in conjunction with knowledge about air conditioner use patterns in the residential and commercial sectors, and prevailing marginal electricity prices, in order to give an estimate of per-unit financial impacts. In addition, the overall impact of the program was evaluated by combining unit savings with market forecasts in order to yield national impacts. LBNL presented preliminary results of these analyses in May 2006, at a meeting of BEEs Technical Committee for Air Conditioners. This meeting was attended by a wide array of stakeholder, including industry representatives, engineers and consumer advocates. Comments made by stakeholders at this meeting are incorporated into the final analysis presented in this report. The current analysis begins with the Rating Plan drafted by BEE in 2006, along with an evaluation of the market baseline according to test data submitted by manufacturers. MEPS, label rating levels, and baseline efficiencies are presented in Section 2. First, we compare Indian MEPS with current standards in other countries, and assess their relative stringency. Baseline efficiencies are then used to estimate the fraction of models likely to remain on the market at each phase of the program, and the impact on market-weighted efficiency levels. Section 3 deals with cost-effectiveness of higher efficiency design options. The cost-benefit analysis is grounded in technical parameters provided by industry representatives in India. This data allows for an assessment of financial costs and benefits to consumers as a result of the standards and labeling program. A Life-Cycle Cost (LCC) calculation is used to evaluate the impacts of the program at the unit level, thus providing some insight into the appropriateness of the levels chosen, and additional opportunities for further ratcheting. In addition to LCC, we also calculate payback periods, cost of conserved energy (CCE), and return on investment (ROI). Finally, Section 4 covers national impacts. This is an extension of unit level estimates in the two previous sections. Extrapolation to the national level depends on a forecast of air conditioner purchases (shipments), which we describe here. Following the cost-benefit analysis, we construct several efficiency scenarios including the BEE plan, but also considering further potential for efficiency improvement. These are combined with shipments through a stock accounting model in order to forecast air conditioner energy consumption in each scenario, and associated electricity savings and carbon emission mitigation. Finally, financial costs and savings are scaled to the national level to evaluate net fiscal benefits.« less

  6. Risk and value analysis of SETI

    NASA Technical Reports Server (NTRS)

    Billingham, J.

    1986-01-01

    The risks, values, and costs of the SETI project are evaluated and compared with those of the Viking project. Examination of the scientific values, side benefits, and costs of the two projects reveal that both projects provide equal benefits at equal costs. The probability of scientific and technical success is analyzed.

  7. The effect of normative social forces on managed care organizations: implications for strategic management.

    PubMed

    Kirby, E G; Sebastian, J G

    1998-01-01

    Drawing on institutional theory, this study examines how adherence to a number of "institutional" and "technical" environmental forces can influence the business success of managed care organizations (MCOs). The standards studied include: (1) institutional forces: socially accepted procedures for delivering care (access to quality care, availability of information, and delivery of care in a personal manner); and (2) technical forces: industry standards for cost control and efficient use of financial and medical resources. The most significant finding is that successful MCOs must conform to both institutional and technical forces to be successful. MCOs that conform to either one or the other type of standard were no more successful than those that conformed to neither. These findings have several important implications for MCO strategy. First, to be successful, MCO executives must understand the external environment in which they operate. They must anticipate and respond to shifts in that environment. Second, this understanding of the external environment must place equal emphasis on societal demands (e.g., for accessible care and information) and on technical demands (e.g., for cost-efficient care). These findings may well reflect that once managed care penetration reaches relatively high levels, marketshare can no longer be gained through cost-efficiency alone; rather, enrollee satisfaction based on societal demands becomes a key factor in maintaining and gaining marketshare. Institutional theory provides' some strategies for accomplishing these goals. Cost-containment strategies include implementing policies for cutting costs in areas that do not affect the quality of care, such as using generic drugs and reducing administrative excesses and redundancies. At the same time, MCOs must implement strategies aimed at improving conformity to prevailing societal perceptions of appropriate care, including providing patients more freedom to choose their physicians and encouraging and rewarding care providers for being friendly and personable. An MCO should work to inform the public of the organization's efforts to provide high-quality, low-cost medical care in a friendly, convenient manner.

  8. Benefit Analysis Report, United States Air Force Technical Order Management Systems (AFTOMS)

    DOT National Transportation Integrated Search

    1989-08-01

    This report prepared by the Transportation Systems Center (TSC) concludes an analysis of the Technical Order (TO) costs and benefits, which was originally undertaken as part of the US Air Force Computer-aided Acquisition and Logistics Support (CALS) ...

  9. Methods applied in cost-effectiveness models for treatment strategies in type 2 diabetes mellitus and their use in Health Technology Assessments: a systematic review of the literature from 2008 to 2013.

    PubMed

    Charokopou, M; Sabater, F J; Townsend, R; Roudaut, M; McEwan, P; Verheggen, B G

    2016-01-01

    To identify and compare health-economic models that were developed to evaluate the cost-effectiveness of treatments for type 2 diabetes mellitus (T2DM), and their use within Health Technology Assessments (HTAs). In total, six commonly used databases were searched for articles published between October 2008 and January 2013, using a protocolized search strategy and inclusion criteria. The websites of HTA organizations in nine countries, and proceedings from five relevant conferences, were also reviewed. The identified new health-economic models were qualitatively assessed using six criteria that were developed based on technical components, and characteristics related to the disease or the treatments being assessed. Finally, the number of times the models were applied within HTA reports, published literature, and/or major conferences was determined. Thirteen new models were identified and reviewed in depth. Most of these were based on identical key data sources, and applied a similar model structure, either using Markov modeling or microsimulation techniques. The UKPDS equations and panel regressions were frequently used to estimate the occurrence of diabetes-related complications and the probability of developing risk factors in the long term. The qualitative assessment demonstrated that the CARDIFF, Sheffield T2DM and ECHO T2DM models seem technically equipped to appropriately assess the long-term health-economic consequences of chronic treatments for patients with T2DM. It was observed that the CORE model is the most widely described in literature and conferences, and the most often applied model within HTA submissions, followed by the CARDIFF and UKPDS models. This research provides an overview of T2DM models that were developed between 2008 and January 2013. The outcomes of the qualitative assessments, combined with frequent use in local reimbursement decisions, prove the applicability of the CORE, CARDIFF and UKPDS models to address decision problems related to the long-term clinical and economic consequences of new and existing T2DM treatments.

  10. Economic justification of costs at inspection of industrial safety of high-rise marine structures

    NASA Astrophysics Data System (ADS)

    Garibin, Pavel; Ol'khovik, Evgeniy; Rastorguev, Igor

    2018-03-01

    The task of technical and economic regulation within mutual international recognition of testing laboratories are considered. Codes and procedures within requirements of international ISO/IEC standards of a series 17000 for elimination of non-tariff barriers and interlaboratory exchange of experts in the field of high-rise marine construction are considered. In paper, the methods of assessment of formation of economically justified cost of works at inspection and monitoring of technical condition of high-rise marine wharf engineering port structure based on settlement and actual labor input were applied. For the countries of EU, data on the average cost of works of testing laboratory within a week have been taken as a basis. Such approach will be objective as considers only expenses on obligatory actions in the course of inspection of technical condition of port engineering constructions. The analysis of public results of financial activities of the accredited organizations allowed to calculate the main indicators of the size of necessary profit and overheads at observance of all requirements imposed to test laboratories including taking into account their future technical development. The offered practice corresponds to the general direction by mutual international recognition of independent testing laboratories and can be use in the future.

  11. Determinants of Change in the Cost-effectiveness Threshold.

    PubMed

    Paulden, Mike; O'Mahony, James; McCabe, Christopher

    2017-02-01

    The cost-effectiveness threshold in health care systems with a constrained budget should be determined by the cost-effectiveness of displacing health care services to fund new interventions. Using comparative statics, we review some potential determinants of the threshold, including the budget for health care, the demand for existing health care interventions, the technical efficiency of existing interventions, and the development of new health technologies. We consider the anticipated direction of impact that would affect the threshold following a change in each of these determinants. Where the health care system is technically efficient, an increase in the health care budget unambiguously raises the threshold, whereas an increase in the demand for existing, non-marginal health interventions unambiguously lowers the threshold. Improvements in the technical efficiency of existing interventions may raise or lower the threshold, depending on the cause of the improvement in efficiency, whether the intervention is already funded, and, if so, whether it is marginal. New technologies may also raise or lower the threshold, depending on whether the new technology is a substitute for an existing technology and, again, whether the existing technology is marginal. Our analysis permits health economists and decision makers to assess if and in what direction the threshold may change over time. This matters, as threshold changes impact the cost-effectiveness of interventions that require decisions now but have costs and effects that fall in future periods.

  12. 78 FR 39303 - Agency Information Collection Activities: Proposed Collection; Comment Request; FEMA's Grants...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... reporting system designed to help State Administrative Agencies (SAAs) meet all reporting requirements as... annual costs to respondents operations and maintenance costs for technical services. There is no annual...

  13. A Determination of Military and Civilian Personnel Costs as Related to a Member of Technical Staff

    DTIC Science & Technology

    1992-06-01

    Costs, 1986 4 2. Direct Total Manpower Bidget Costs, 1992 5 3. Pay Raises 1985-1992 6 4. Support Costs 9 5. Internal Support Personnel 10 6. External...34 Incremental Costs of Military and Civilian Manpower in the Military Services." This docu- ment provides the basis for this section. The report assesses...6 Aug 91. MTS Workyear Cost Comparison. Internal AFSC paper, 20 November 1990. Palmer, Adele R., Osbaldeston, David J., Incremental Costs of Military

  14. Transplantation of Bioprinted Tissues and Organs: Technical and Clinical Challenges and Future Perspectives.

    PubMed

    Ravnic, Dino J; Leberfinger, Ashley N; Koduru, Srinivas V; Hospodiuk, Monika; Moncal, Kazim K; Datta, Pallab; Dey, Madhuri; Rizk, Elias; Ozbolat, Ibrahim T

    2017-07-01

    : Three-dimensional (3D) bioprinting is a revolutionary technology in building living tissues and organs with precise anatomic control and cellular composition. Despite the great progress in bioprinting research, there has yet to be any clinical translation due to current limitations in building human-scale constructs, which are vascularized and readily implantable. In this article, we review the current limitations and challenges in 3D bioprinting, including in situ techniques, which are one of several clinical translational models to facilitate the application of this technology from bench to bedside. A detailed discussion is made on the technical barriers in the fabrication of scalable constructs that are vascularized, autologous, functional, implantable, cost-effective, and ethically feasible. Clinical considerations for implantable bioprinted tissues are further expounded toward the correction of end-stage organ dysfunction and composite tissue deficits.

  15. Automatic Publishing of Library Bulletins.

    ERIC Educational Resources Information Center

    Inbal, Moshe

    1980-01-01

    Describes the use of a computer to publish library bulletins that list recent accessions of technical reports according to the subject classification scheme of NTIS/SRIM (National Technical Information Service's Scientific Reports in Microfiche). The codes file, the four computer program functions, and costs/economy are discussed. (JD)

  16. 7 CFR 3560.53 - Eligible use of funds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be used for central cooking and dining areas. (h) Management-related facilities. Funds may be used to... requirements. (m) Legal, technical and professional services. Funds may be used for the costs of legal, technical, and professional services related to the borrower's MFH project, including appraisals...

  17. 76 FR 8720 - Notice of Proposed Solicitation for Cooperative Agreement Applications (SCAA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... Procurement Technical Assistance Program (PTAP) by awarding cost sharing cooperative agreements to assist eligible entities in establishing or maintaining procurement technical assistance centers (PTACs) pursuant... available for distribution. Written comments regarding this proposed SCAA may be submitted via mail to...

  18. 75 FR 24663 - Notice of Proposed Solicitation for Cooperative Agreement Applications (SCAA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Procurement Technical Assistance Program (PTAP) by awarding cost sharing cooperative agreements to assist eligible entities in establishing or maintaining procurement technical assistance centers (PTACs) pursuant... recipients'' at the bottom of the page). Printed copies are not available for distribution. Written comments...

  19. Profitability of simple stationary technical trading rules with high-frequency data of Chinese Index Futures

    NASA Astrophysics Data System (ADS)

    Chen, Jing-Chao; Zhou, Yu; Wang, Xi

    2018-02-01

    Technical trading rules have been widely used by practitioners in financial markets for a long time. The profitability remains controversial and few consider the stationarity of technical indicators used in trading rules. We convert MA, KDJ and Bollinger bands into stationary processes and investigate the profitability of these trading rules by using 3 high-frequency data(15s,30s and 60s) of CSI300 Stock Index Futures from January 4th 2012 to December 31st 2016. Several performance and risk measures are adopted to assess the practical value of all trading rules directly while ADF-test is used to verify the stationarity and SPA test to check whether trading rules perform well due to intrinsic superiority or pure luck. The results show that there are several significant combinations of parameters for each indicator when transaction costs are not taken into consideration. Once transaction costs are included, trading profits will be eliminated completely. We also propose a method to reduce the risk of technical trading rules.

  20. IT Labs Proof-of-Concept Project: Technical Data Interoperability (TDI) Pathfinder Via Emerging Standards

    NASA Technical Reports Server (NTRS)

    Conroy, Mike; Gill, Paul; Ingalls, John; Bengtsson, Kjell

    2014-01-01

    No known system is in place to allow NASA technical data interoperability throughout the whole life cycle. Life Cycle Cost (LCC) will be higher on many developing programs if action isn't taken soon to join disparate systems efficiently. Disparate technical data also increases safety risks from poorly integrated elements. NASA requires interoperability and industry standards, but breaking legacy ways is a challenge.

  1. Initial technical environmental, and economic evaluation of space solar power concepts. Volume 2: Detailed report

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The SPS concepts which appear to be technically feasible are discussed in terms of the economic viability and competitive costs with other energy sources. The concepts discussed include: power station, microwave reception and conversion, space construction and maintenance, space transportation, and program costs and analysis. The conclusions presented include: (1) The maximum output of an individual microwave transmission link to earth is about 5 GW. (2) The mass of 10 GW SPS is between 47,000,000 and 124,000,00 kg. (3) The silicon solar cell arrays make up well over half the weight and cost of the satellite. (4) The SPS in equatorial orbit will be eclipsed by the earth and by other satellites.

  2. Crop area estimation based on remotely-sensed data with an accurate but costly subsample

    NASA Technical Reports Server (NTRS)

    Gunst, R. F.

    1985-01-01

    Research activities conducted under the auspices of National Aeronautics and Space Administration Cooperative Agreement NCC 9-9 are discussed. During this contract period research efforts are concentrated in two primary areas. The first are is an investigation of the use of measurement error models as alternatives to least squares regression estimators of crop production or timber biomass. The secondary primary area of investigation is on the estimation of the mixing proportion of two-component mixture models. This report lists publications, technical reports, submitted manuscripts, and oral presentation generated by these research efforts. Possible areas of future research are mentioned.

  3. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    NASA Astrophysics Data System (ADS)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  4. X-ray satellite

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 3rd Quarter Status Report on DFVLR's ROSAT project confirms that with regard to technical performance and costs the project is on schedule. The valid schedule for engineering model and flight model completion on May 7, 1985 leads to a launch date on October 30, 1987. Progress in each department is compared to and explained with regard to the milestone plan. Continued problems with the gold damping of the FM-mirror system and contamination of the sterile rooms where the mirrors are stored have led to postponement of milestone 7. It is not yet completely clear to what extent all successive milestones will be affected by this factor.

  5. Developments in abatement technology for MOCVD processing

    NASA Astrophysics Data System (ADS)

    Sweeney, Joseph; Marganski, Paul; Olander, Karl; Watanabe, Tadaharu; Tomita, Nobuyasu; Orlando, Gary; Torres, Robert

    2004-12-01

    A newly developed technical solution has been developed for hydride gas abatement that utilizes a new material. The ULTIMA-Sorb™ material provides high capacity but low heat of reaction with the hydride gases. The new technology results in a low cost of ownership (COO) with stable operation and also reduces the cost and quantity of waste disposal. This can be significant benefit for device manufacturers since it provides a viable and cost effective solution without any risk of arsenic leakage that is a primary concern with wet chemical scrubber systems. The contents of this paper will discuss the technical and economic benefits of the newly developed material in comparison to conventional abatement materials and systems. The capacity of the dry abatement materials significantly influences both COO relating to cash outflow and the cost of lost production. High capacity materials enable significant savings in cost of lost production in cases of low and high factory utilization conditions. Capacity of the abatement material appears to be the largest single factor to reduce COO of dry abatement systems.

  6. Eradication versus control for poliomyelitis: an economic analysis.

    PubMed

    Thompson, Kimberly M; Tebbens, Radboud J Duintjer

    2007-04-21

    Worldwide eradication of wild polioviruses is likely to yield substantial health and financial benefits, provided we finish the job. Challenges in the four endemic areas combined with continuing demands for financial resources for eradication have led some to question the goal of eradication and to suggest switching to a policy of control. We developed a dynamic model, based on modelling of the currently endemic areas in India, to show the importance of maintaining and increasing the immunisation intensity to complete eradication and to illustrate how policies based on perception about high short-term costs or cost-effectiveness ratios without consideration of long-term benefits could undermine any eradication effort. An extended model assesses the economic implications and disease burden of a change in policy from eradication to control. Our results suggest that the intensity of immunisation must be increased to achieve eradication, and that even small decreases in intensity could lead to large outbreaks. This finding implies the need to pay even higher short-run costs than are currently being spent, which will further exacerbate concerns about continued investment in interventions with high perceived cost-effectiveness ratios. We show that a wavering commitment leads to a failure to eradicate, greater cumulative costs, and a much larger number of cases. We further show that as long as it is technically achievable, eradication offers both lower cumulative costs and cases than control, even with the costs of achieving eradication exceeding several billion dollars more. A low-cost control policy that relies only on routine immunisation for 20 years with discounted costs of more than $3500 million could lead to roughly 200 000 expected paralytic poliomyelitis cases every year in low-income countries, whereas a low-case control policy that keeps the number of cases at about 1500 per year could cost around $10 000 million discounted over the 20 years. Focusing on the large costs for poliomyelitis eradication, without assessing the even larger potential benefits of eradication and the enormous long-term costs of effective control, might inappropriately affect commitments to the goal of eradication, and thus debate should include careful consideration of the options.

  7. Low Cost and Energy Efficient Methods for the Manufacture of Semi-Solid (SSM) Feedstock

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diran Apelian; Qingyue Pan; Makhlouf Makhlouf

    2005-11-07

    The SSM Consortium (now ACRC) at WPI has been carrying out fundamental, pre-competitive research in SSM for several years. Current and past research (at WPI) has generated many results of fundamental and applied nature, which are available to the SSM community. These include materials characterization, yield stress effects, alloy development, rheological properties, process modeling/simulation, semi-solid slurry formation, etc. Alternative method to produce SSM slurries at lower processing costs and with reduced energy consumption is a critical need. The production of low cost SSM feedstock will certainly lead to a dramatic increase in the tonnage of castings produced by SSM, andmore » will provide end users such as the transportation industry, with lighter, cheaper and high performance materials. In this program, the research team has addressed three critical issues in semi-solid processing. They are: (1) Development of low cost, reliable slurry-on-demand approaches for semi-solid processing; (2) Application of the novel permanent grain refining technology-SiBloy for the manufacture of high-quality SSM feedstock, and (3) Development of computational and modeling tools for semi-solid processing to enhance SSM process control. Salient results from these studies are summarized and detailed in our final technical report.« less

  8. Time-driven activity-based costing.

    PubMed

    Kaplan, Robert S; Anderson, Steven R

    2004-11-01

    In the classroom, activity-based costing (ABC) looks like a great way to manage a company's limited resources. But executives who have tried to implement ABC in their organizations on any significant scale have often abandoned the attempt in the face of rising costs and employee irritation. They should try again, because a new approach sidesteps the difficulties associated with large-scale ABC implementation. In the revised model, managers estimate the resource demands imposed by each transaction, product, or customer, rather than relying on time-consuming and costly employee surveys. This method is simpler since it requires, for each group of resources, estimates of only two parameters: how much it costs per time unit to supply resources to the business's activities (the total overhead expenditure of a department divided by the total number of minutes of employee time available) and how much time it takes to carry out one unit of each kind of activity (as estimated or observed by the manager). This approach also overcomes a serious technical problem associated with employee surveys: the fact that, when asked to estimate time spent on activities, employees invariably report percentages that add up to 100. Under the new system, managers take into account time that is idle or unused. Armed with the data, managers then construct time equations, a new feature that enables the model to reflect the complexity of real-world operations by showing how specific order, customer, and activity characteristics cause processing times to vary. This Tool Kit uses concrete examples to demonstrate how managers can obtain meaningful cost and profitability information, quickly and inexpensively. Rather than endlessly updating and maintaining ABC data,they can now spend their time addressing the deficiencies the model reveals: inefficient processes, unprofitable products and customers, and excess capacity.

  9. Business intelligence modeling in launch operations

    NASA Astrophysics Data System (ADS)

    Bardina, Jorge E.; Thirumalainambi, Rajkumar; Davis, Rodney D.

    2005-05-01

    The future of business intelligence in space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems. This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations, process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations, and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems.

  10. Business Intelligence Modeling in Launch Operations

    NASA Technical Reports Server (NTRS)

    Bardina, Jorge E.; Thirumalainambi, Rajkumar; Davis, Rodney D.

    2005-01-01

    This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

  11. Commentary on NTIS Document Costs

    ERIC Educational Resources Information Center

    Richardson, Robert J.

    1973-01-01

    The author believes it would be appropriate to review the current National Technical Information Service (NTIS) pricing policy in terms of its rationale, legality, and the possibility of mitigating or reversing the demonstrated pattern of repeated cost increases. (Author/SJ)

  12. RETROFITTING CONTROL FACILITIES FOR WET WEATHER FLOW TREATMENT

    EPA Science Inventory

    Available technologies were evaluated to demonstrate the technical feasibility and cost-effectiveness of retrofitting existing facilities to handle wet-weather flow. Cost/benefit relationships were also compared to construction of new conventional control and treatment facilitie...

  13. RETROFITTING CONTROL FACILITIES FOR WET-WEATHER FLOW TREATMENT

    EPA Science Inventory

    Available technologies were evaluated to demonstrate the technical feasibility and cost effectiveness of retrofitting existing facilities to handle wet-weather flow. Cost/benefit relationships were also compared to construction of new conventional control and treatment facilities...

  14. Short-term bulk energy storage system scheduling for load leveling in unit commitment: modeling, optimization, and sensitivity analysis

    PubMed Central

    Hemmati, Reza; Saboori, Hedayat

    2016-01-01

    Energy storage systems (ESSs) have experienced a very rapid growth in recent years and are expected to be a promising tool in order to improving power system reliability and being economically efficient. The ESSs possess many potential benefits in various areas in the electric power systems. One of the main benefits of an ESS, especially a bulk unit, relies on smoothing the load pattern by decreasing on-peak and increasing off-peak loads, known as load leveling. These devices require new methods and tools in order to model and optimize their effects in the power system studies. In this respect, this paper will model bulk ESSs based on the several technical characteristics, introduce the proposed model in the thermal unit commitment (UC) problem, and analyze it with respect to the various sensitive parameters. The technical limitations of the thermal units and transmission network constraints are also considered in the model. The proposed model is a Mixed Integer Linear Programming (MILP) which can be easily solved by strong commercial solvers (for instance CPLEX) and it is appropriate to be used in the practical large scale networks. The results of implementing the proposed model on a test system reveal that proper load leveling through optimum storage scheduling leads to considerable operation cost reduction with respect to the storage system characteristics. PMID:27222741

  15. Short-term bulk energy storage system scheduling for load leveling in unit commitment: modeling, optimization, and sensitivity analysis.

    PubMed

    Hemmati, Reza; Saboori, Hedayat

    2016-05-01

    Energy storage systems (ESSs) have experienced a very rapid growth in recent years and are expected to be a promising tool in order to improving power system reliability and being economically efficient. The ESSs possess many potential benefits in various areas in the electric power systems. One of the main benefits of an ESS, especially a bulk unit, relies on smoothing the load pattern by decreasing on-peak and increasing off-peak loads, known as load leveling. These devices require new methods and tools in order to model and optimize their effects in the power system studies. In this respect, this paper will model bulk ESSs based on the several technical characteristics, introduce the proposed model in the thermal unit commitment (UC) problem, and analyze it with respect to the various sensitive parameters. The technical limitations of the thermal units and transmission network constraints are also considered in the model. The proposed model is a Mixed Integer Linear Programming (MILP) which can be easily solved by strong commercial solvers (for instance CPLEX) and it is appropriate to be used in the practical large scale networks. The results of implementing the proposed model on a test system reveal that proper load leveling through optimum storage scheduling leads to considerable operation cost reduction with respect to the storage system characteristics.

  16. The Costs and Economies of Open and Distance Learning.

    ERIC Educational Resources Information Center

    Rumble, Greville

    This book is designed to give planners of open and distance learning programs the technical information needed to determine the cost of programs and analyze the behavior of costs. The following are among the topics discussed: budgets; classification of resources (human resources, premises and accommodation, and equipment and furniture); a basic…

  17. Induction of labor using prostaglandin vaginal gel: cost analysis comparing early amniotomy with repeat prostaglandin gel.

    PubMed

    Beckmann, Michael; Merollini, Katharina; Kumar, Sailesh; Flenady, Vicki

    2016-04-01

    In a randomized controlled trial of two policies for induction of labor (IOL) using Prostaglandin E2 (PGE2) vaginal gel, women who had an earlier amniotomy experienced a shorter IOL-to-birth time. To report the cost analysis of this trial and determine if there are differences in healthcare costs when an early amniotomy is performed as opposed to giving more PGE2 vaginal gel, for women undergoing IOL at term. Following an evening dose of PGE2 vaginal gel, 245 women with live singleton pregnancies, ≥37+0 weeks, were randomized into an amniotomy or repeat-PGE2 group. Healthcare costs were a secondary outcome measure, sourced from hospital finance systems and included staff costs, equipment and consumables, pharmacy, pathology, hotel services and business overheads. A decision analytic model, specifically a Markov chain, was developed to further investigate costs, and a Monte Carlo simulation was performed to confirm the robustness of these findings. Mean and median costs and cost differences between the two groups are reported, from the hospital perspective. The healthcare costs associated with IOL were available for all 245 trial participants. A 1000-patient cohort simulation demonstrated that performing an early amniotomy was associated with a cost-saving of $AUD289 ($AUD7094 vs $AUD7338) per woman induced, compared with administering more PGE2. Propagating the uncertainty through the model 10,000 times, early amniotomy was associated with a median cost savings of $AUD487 (IQR -$AUD573, +$AUD1498). After an initial dose of PGE2 vaginal gel, a policy of administering more PGE2 when the Modified Bishop's score is <7 was associated with increased healthcare costs compared with a policy of performing an amniotomy, if technically possible. Length of stay was the main driver of healthcare costs. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  18. Economic analysis of CDC's culture- and smear-based tuberculosis instructions for Filipino immigrants.

    PubMed

    Maskery, B; Posey, D L; Coleman, M S; Asis, R; Zhou, W; Painter, J A; Wingate, L T; Roque, M; Cetron, M S

    2018-04-01

    In 2007, the US Centers for Disease Control and Prevention (CDC) revised its tuberculosis (TB) technical instructions for panel physicians who administer mandatory medical examinations among US-bound immigrants. Many US-bound immigrants come from the Philippines, a high TB prevalence country. To quantify economic and health impacts of smear- vs. culture-based TB screening. Decision tree modeling was used to compare three Filipino screening programs: 1) no screening, 2) smear-based screening, and 3) culture-based screening. The model incorporated pre-departure TB screening results from Filipino panel physicians and CDC databases with post-arrival follow-up outcomes. Costs (2013 $US) were examined from societal, immigrant, US Public Health Department and hospitalization perspectives. With no screening, an annual cohort of 35 722 Filipino immigrants would include an estimated 450 TB patients with 264 hospitalizations, at a societal cost of US$9.90 million. Culture-based vs. smear-based screening would result in fewer imported cases (80.9 vs. 310.5), hospitalizations (19.7 vs. 68.1), and treatment costs (US$1.57 million vs. US$4.28 million). Societal screening costs, including US follow-up, were greater for culture-based screening (US$5.98 million) than for smear-based screening (US$3.38 million). Culture-based screening requirements increased immigrant costs by 61% (US$1.7 million), but reduced costs for the US Public Health Department (22%, US$750 000) and of hospitalization (70%, US$1 020 000). Culture-based screening reduced imported TB and US costs among Filipino immigrants.

  19. Space Tug Docking Study. Volume 5: Cost Analysis

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

  20. Avoidable Technical and Clinical Denial Write-Off Management in Hospitals, Physician Offices, and Clinics.

    PubMed

    Terra, Sandra Marlene; Byrne, Amanda

    2016-01-01

    This article reviews the various types of technical and clinical denials that are usually "written off" and proposes strategies to prevent this loss. For purposes of this writing, avoidable technical and clinical denial write-offs are defined as revenue lost from "first-pass" denials rejections. For example, a procedure that requires an authorization is performed without having had an authorization obtained. After appeals and attempts to recoup the revenue, often unsuccessful, the organization ultimately "writes off" the revenue as not collectable. The question to ask is: Are these claims really not collectable or can actionable steps be taken to conserve these dollars and improve the bottom line? Acute care hospitals, physician offices, and clinics. In today's environment, the need to manage costs is ubiquitous. Cost management is on the priority list of all savvy health care executives, even if margins are healthy, revenue is under pressure, and the magnitude of cost reduction needed is greater than what past efforts have achieved. As hospitals and physician clinics prioritize areas for improvement, reduction in lost revenue-especially avoidable lost revenue-should be at the top of the list. Attentively managing claim denial write-offs will significantly reduce lost revenue. There is significant interface between case management and the revenue cycle. Developing core competencies for reducing clinical and technical denials should be a critical imperative in overall cost management strategy. Case managers are well placed to prevent these unnecessary losses through accurate status determination and clinical documentation review. These clinical professionals can also provide insight into work flow and other processes inherent in the preauthorization process.

Top