48 CFR 315.305 - Proposal evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... following elements: (1) An explanation of the evaluation process and the role of evaluators throughout the... include, at a minimum, the following elements: (1) A list of recommended technical evaluation panel... that the technical evaluation will have in the award decision. (2) The technical evaluation process...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-12
... modeling demonstration should include supporting technical analyses and descriptions of all relevant....5 and NO X . The attainment demonstration includes: Technical analyses that locate, identify, and... modeling analysis is a complex technical evaluation that began with selection of the modeling system. The...
Urban Rail Supporting Technology Program Fiscal Year 1974 Year End Summary
DOT National Transportation Integrated Search
1975-03-01
Major areas include program management, technical support and application engineering, facilities development, test and evaluation, and technology development. Specific technical discussion includes track measurement systems; UMTA facilities developm...
1988-09-01
Test and Evaluation Report Test and Evaluation of the Navy Technical Information Presentation System (NTIPS) F-14A Field Test Results by .0 Joseph J...PROGRAM PROJECT TASK WORK UNIT Washington, D.C. 20361 ELEMENT NO. NO. NO. ACCESSION NO. OMN 1820 11. TITLE (Include Security Classification) TEST AND...EVALUATION OF THE NAVY TECHNICAL INFORMATION PRESENTATION SYSTEM (NTIPS) F-14A FIELD TEST RESULTS 12. PERSONAL AUTHOR(S) Fuller, Joseph F. (DTRC) Post
OrbView-3 Technical Performance Evaluation 2005: Modulation Transfer Function
NASA Technical Reports Server (NTRS)
Cole, Aaron
2007-01-01
The Technical performance evaluation of OrbView-3 using the Modulation Transfer Function (MTF) is presented. The contents include: 1) MTF Results and Methodology; 2) Radiometric Calibration Methodology; and 3) Relative Radiometric Assessment Results
Technical Evaluation Motor No. 7 (TEM-7)
NASA Technical Reports Server (NTRS)
Hughes, Phil
1991-01-01
The Technical Evaluation Motor No. 7 (TEM-7) test was a full-scale, full duration static test firing of a high performance motor-configuration solid rocket motor with nozzle vectoring. The final test report documents the procedures, performance, and results of the static test firing of TEM-7. All observations, discussions, conclusions, and recommendations included in the report are complete and final except for the TEM-7 fixed housing unbond investigation. A presentation and discussion of TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107, Rev A, Space Shuttle Technical Evaluation Motor No. 7 (TEM-7) Static Fire Test Plan are included.
Evaluation of Title I ESEA Projects, 1976-77: Technical Reports. Report #77140.
ERIC Educational Resources Information Center
Philadelphia School District, PA. Office of Research and Evaluation.
This volume compiles technical reports of Title I Elementary and Secondary Education Act project evaluations conducted during the 1976-77 academic year in the school district of Philadelphia, Pennsylvania. The reports include rationale, expected outcomes, mode of operation, previous evaluative findings, current implementation, and attainment of…
Initiatives in Technical and Further Education. Numbers 3 and 4.
ERIC Educational Resources Information Center
National TAFE Clearinghouse, Adelaide (Australia).
These two issues contain abstracts of 127 and 118 documents, respectively, related to the field of technical and further education that are available through the Australian Technical and Further Education (TAFE) Clearinghouse system. These types of materials are included: research reports/technical reports, evaluation studies, curriculum materials…
42 CFR 431.424 - Evaluation requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... evaluations. Demonstration evaluations will include the following: (1) Quantitative research methods. (i... of appropriate evaluation strategies (including experimental and other quantitative and qualitative... demonstration. (ii) CMS will consider alternative evaluation designs when quantitative designs are technically...
42 CFR 431.424 - Evaluation requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... evaluations. Demonstration evaluations will include the following: (1) Quantitative research methods. (i... of appropriate evaluation strategies (including experimental and other quantitative and qualitative... demonstration. (ii) CMS will consider alternative evaluation designs when quantitative designs are technically...
42 CFR 431.424 - Evaluation requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... evaluations. Demonstration evaluations will include the following: (1) Quantitative research methods. (i... of appropriate evaluation strategies (including experimental and other quantitative and qualitative... demonstration. (ii) CMS will consider alternative evaluation designs when quantitative designs are technically...
ERIC Educational Resources Information Center
Behr, Shirley K.; And Others
The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…
Whither the White Knight: CDROM in Technical Services.
ERIC Educational Resources Information Center
Campbell, Brian
1987-01-01
Outlines evaluative criteria and compares optical data disk products used in library technical processes, including bibliographic records for cataloging, acquisition databases, and local public access catalogs. An extensive table provides information on specific products, including updates, interfaces, edit screens, installation help, manuals,…
Technical Evaluation Motor No. 10 (TEM-10)
NASA Technical Reports Server (NTRS)
1993-01-01
Technical Evaluation Motor No. 10 (TEM-10) was static fired on 27 Apr. 1993 at the Thiokol Corporation full-scale motor static test bay, T-24. This final test report documents the procedures, performance, and results of the static test firing of TEM-10. All observations, discussions, conclusions, and recommendations contained are final. Included is a presentation and discussion of TEM-10 performance, anomalies, and test results in concurrence with the objectives outlined in CTP-0110, Revision D, Space Shuttle Technical Evaluation Motor No. 10 (TEM-10) Static Fire Test Plan.
CAI Programs and Macros for Formative Curriculum Evaluation.
ERIC Educational Resources Information Center
Dasenbrock, David; Teates, Thomas
This technical memo is designed for persons who are interested in research with and development of curriculum material. Detailed information regarding computer programs, and program documentation used in the development and evaluation of ISCS curriculum materials is provided. The memo includes supplemental information to ISCS Technical Report I…
Guidelines for Establishing and Evaluating High School Technical Electromechanics Programs.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Div. of Vocational, Technical and Adult Education.
Educators and industrial representatives developed these guidelines for school officials, instructors in technical education, and program and facility planners to use in planning a high school program in technical electromechanics. Designed to train students for entry into industry in applied electromechanics, the program includes electricity,…
How to Recognize a Quality Technical Education Program.
ERIC Educational Resources Information Center
Doty, Charles R.
Criteria for the evaluation of quality technical educational programs must be identified if follow-up studies are to be effective. Current research shows that problems in the development of such criteria include the tendency to evaluate programs on the basis of organizational structure rather than on the quality of the instructional program…
Evaluation of simparteam - a needs-orientated team training format for obstetrics and neonatology.
Zech, Alexandra; Gross, Benedict; Jasper-Birzele, Céline; Jeschke, Katharina; Kieber, Thomas; Lauterberg, Jörg; Lazarovici, Marc; Prückner, Stephan; Rall, Marcus; Reddersen, Silke; Sandmeyer, Benedikt; Scholz, Christoph; Stricker, Eric; Urban, Bert; Zobel, Astrid; Singer, Ingeborg
2017-04-01
A standardized team-training program for healthcare professionals in obstetric units was developed based on an analysis of common causes for adverse events found in claims registries. The interdisciplinary and inter-professional training concept included both technical and non-technical skill training. Evaluation of the program was carried out in hospitals with respect to the immediate personal learning of participants and also regarding changes in safety culture. Trainings in n=7 hospitals including n=270 participants was evaluated using questionnaires. These were administered at four points in time to staff from participating obstetric units: (1) 10 days ahead of the training (n=308), (2) on training day before (n=239), (3) right after training (n=248), and (4) 6 months after (n=188) the intervention. Questionnaires included several questions for technical and non-technical skills and the Hospital Survey on Patient Safety (HSOPS). Strong effects were found in the participants' perception of their own competence regarding technical skills and handling of emergencies. Small effects could be observed in the scales of the HSOPS questionnaire. Most effects differed depending on professional groups and hospitals. Integrated technical and team management training can raise employees' confidence with complex emergency management skills and processes. Some indications for improvements on the patient safety culture level were detected. Furthermore, differences between professional groups and hospitals were found, indicating the need for more research on contributing factors for patient safety and for the success of crew resource management (CRM) trainings.
Assessing Technical Competence in Surgical Trainees: A Systematic Review.
Szasz, Peter; Louridas, Marisa; Harris, Kenneth A; Aggarwal, Rajesh; Grantcharov, Teodor P
2015-06-01
To systematically examine the literature describing the methods by which technical competence is assessed in surgical trainees. The last decade has witnessed an evolution away from time-based surgical education. In response, governing bodies worldwide have implemented competency-based education paradigms. The definition of competence, however, remains elusive, and the impact of these education initiatives in terms of assessment methods remains unclear. A systematic review examining the methods by which technical competence is assessed was conducted by searching MEDLINE, EMBASE, PsychINFO, and the Cochrane database of systematic reviews. Abstracts of retrieved studies were reviewed and those meeting inclusion criteria were selected for full review. Data were retrieved in a systematic manner, the validity and reliability of the assessment methods was evaluated, and quality was assessed using the Grading of Recommendations Assessment, Development and Evaluation classification. Of the 6814 studies identified, 85 studies involving 2369 surgical residents were included in this review. The methods used to assess technical competence were categorized into 5 groups; Likert scales (37), benchmarks (31), binary outcomes (11), novel tools (4), and surrogate outcomes (2). Their validity and reliability were mostly previously established. The overall Grading of Recommendations Assessment, Development and Evaluation for randomized controlled trials was high and low for the observational studies. The definition of technical competence continues to be debated within the medical literature. The methods used to evaluate technical competence predominantly include instruments that were originally created to assess technical skill. Very few studies identify standard setting approaches that differentiate competent versus noncompetent performers; subsequently, this has been identified as an area with great research potential.
RTO Technical Publications: A Quarterly Listing
NASA Technical Reports Server (NTRS)
2001-01-01
This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information from Oct 1, 2001 through Dec 31, 2001. This listing includes one citataion titled 'Logistics Test and Evaluation in Flight'.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.
Accomplishments and challenges of surgical simulation.
Satava, R M
2001-03-01
For nearly a decade, advanced computer technologies have created extraordinary educational tools using three-dimensional (3D) visualization and virtual reality. Pioneering efforts in surgical simulation with these tools have resulted in a first generation of simulators for surgical technical skills. Accomplishments include simulations with 3D models of anatomy for practice of surgical tasks, initial assessment of student performance in technical skills, and awareness by professional societies of potential in surgical education and certification. However, enormous challenges remain, which include improvement of technical fidelity, standardization of accurate metrics for performance evaluation, integration of simulators into a robust educational curriculum, stringent evaluation of simulators for effectiveness and value added to surgical training, determination of simulation application to certification of surgical technical skills, and a business model to implement and disseminate simulation successfully throughout the medical education community. This review looks at the historical progress of surgical simulators, their accomplishments, and the challenges that remain.
Laboratory evaluation of detectors of explosives' effluents
DOT National Transportation Integrated Search
1972-11-30
This document contains the classification, technical description and laboratory evaluation of five commercial detectors for explosives' effluents. It includes an outline of operating principles, test and evaluation procedures. The evaluation is based...
ERIC Educational Resources Information Center
Max, Jeffrey; Glazerman, Steven
2014-01-01
This document represents the technical appendix intended to accompany "Do Disadvantaged Students Get Less Effective Teaching? Key Findings from Recent Institute of Education Sciences Studies. NCEE Evaluation Brief. NCEE 2014-4010." Contents include: (1) Summary of Related, Non-Peer-Reviewed Studies; (2) Methods for Comparing Findings…
Brewin, James; Tang, Jessica; Dasgupta, Prokar; Khan, Muhammad S; Ahmed, Kamran; Bello, Fernando; Kneebone, Roger; Jaye, Peter
2015-07-01
To evaluate the face, content and construct validity of the distributed simulation (DS) environment for technical and non-technical skills training in endourology. To evaluate the educational impact of DS for urology training. DS offers a portable, low-cost simulated operating room environment that can be set up in any open space. A prospective mixed methods design using established validation methodology was conducted in this simulated environment with 10 experienced and 10 trainee urologists. All participants performed a simulated prostate resection in the DS environment. Outcome measures included surveys to evaluate the DS, as well as comparative analyses of experienced and trainee urologist's performance using real-time and 'blinded' video analysis and validated performance metrics. Non-parametric statistical methods were used to compare differences between groups. The DS environment demonstrated face, content and construct validity for both non-technical and technical skills. Kirkpatrick level 1 evidence for the educational impact of the DS environment was shown. Further studies are needed to evaluate the effect of simulated operating room training on real operating room performance. This study has shown the validity of the DS environment for non-technical, as well as technical skills training. DS-based simulation appears to be a valuable addition to traditional classroom-based simulation training. © 2014 The Authors BJU International © 2014 BJU International Published by John Wiley & Sons Ltd.
ERIC Educational Resources Information Center
Killingsworth, Jimmie, Ed.; And Others
The 27 articles in this 6-part guide provide information on developing and implementing writing instruction as part of content-area courses in two-year vocational-technical colleges. Part One, General Concerns, includes "Making Writing Work for You in the Interactive Classroom" (Killingsworth, Rude); "Evaluating and Responding to Student Writing"…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-05
... Marian Robinson found in the Federal Register (FR) on July 30, 2010, entitled ``Technical Review Panel on... and should include the e-mail address for Marian Robinson ( marian.robinson@hhs.gov ). Applicability...
NASA Hydrogen Research for Spaceport and Space Based Applications
NASA Technical Reports Server (NTRS)
Anderson, Tim
2005-01-01
Project management activities for this grant includes internal oversight, coordination and facilitation among research groups (internal to UF and external); system and/or trade studies to assist in evaluating and prioritizing new hydrogen production processes that may become available for potential research investigations; a technical and programmatic outreach activity; and formal reporting, including periodic technical reviews with the NASA team.
Min, Ari; Park, Chang Gi; Scott, Linda D
2016-05-23
Data envelopment analysis (DEA) is an advantageous non-parametric technique for evaluating relative efficiency of performance. This article describes use of DEA to estimate technical efficiency of nursing care and demonstrates the benefits of using multilevel modeling to identify characteristics of efficient facilities in the second stage of analysis. Data were drawn from LTCFocUS.org, a secondary database including nursing home data from the Online Survey Certification and Reporting System and Minimum Data Set. In this example, 2,267 non-hospital-based nursing homes were evaluated. Use of DEA with nurse staffing levels as inputs and quality of care as outputs allowed estimation of the relative technical efficiency of nursing care in these facilities. In the second stage, multilevel modeling was applied to identify organizational factors contributing to technical efficiency. Use of multilevel modeling avoided biased estimation of findings for nested data and provided comprehensive information on differences in technical efficiency among counties and states. © The Author(s) 2016.
14 CFR 1260.71 - Supplements and renewals.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., continued research relevance, and progress made by the recipient. (2) To insure uninterrupted programs, the technical office should forward to the grant office a completed award package, including a funded procurement request, technical evaluation of the proposed budget, and other support documentation, at least 29...
Huang, Erich P; Wang, Xiao-Feng; Choudhury, Kingshuk Roy; McShane, Lisa M; Gönen, Mithat; Ye, Jingjing; Buckler, Andrew J; Kinahan, Paul E; Reeves, Anthony P; Jackson, Edward F; Guimaraes, Alexander R; Zahlmann, Gudrun
2015-02-01
Medical imaging serves many roles in patient care and the drug approval process, including assessing treatment response and guiding treatment decisions. These roles often involve a quantitative imaging biomarker, an objectively measured characteristic of the underlying anatomic structure or biochemical process derived from medical images. Before a quantitative imaging biomarker is accepted for use in such roles, the imaging procedure to acquire it must undergo evaluation of its technical performance, which entails assessment of performance metrics such as repeatability and reproducibility of the quantitative imaging biomarker. Ideally, this evaluation will involve quantitative summaries of results from multiple studies to overcome limitations due to the typically small sample sizes of technical performance studies and/or to include a broader range of clinical settings and patient populations. This paper is a review of meta-analysis procedures for such an evaluation, including identification of suitable studies, statistical methodology to evaluate and summarize the performance metrics, and complete and transparent reporting of the results. This review addresses challenges typical of meta-analyses of technical performance, particularly small study sizes, which often causes violations of assumptions underlying standard meta-analysis techniques. Alternative approaches to address these difficulties are also presented; simulation studies indicate that they outperform standard techniques when some studies are small. The meta-analysis procedures presented are also applied to actual [18F]-fluorodeoxyglucose positron emission tomography (FDG-PET) test-retest repeatability data for illustrative purposes. © The Author(s) 2014 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.
Huang, Erich P; Wang, Xiao-Feng; Choudhury, Kingshuk Roy; McShane, Lisa M; Gönen, Mithat; Ye, Jingjing; Buckler, Andrew J; Kinahan, Paul E; Reeves, Anthony P; Jackson, Edward F; Guimaraes, Alexander R; Zahlmann, Gudrun
2017-01-01
Medical imaging serves many roles in patient care and the drug approval process, including assessing treatment response and guiding treatment decisions. These roles often involve a quantitative imaging biomarker, an objectively measured characteristic of the underlying anatomic structure or biochemical process derived from medical images. Before a quantitative imaging biomarker is accepted for use in such roles, the imaging procedure to acquire it must undergo evaluation of its technical performance, which entails assessment of performance metrics such as repeatability and reproducibility of the quantitative imaging biomarker. Ideally, this evaluation will involve quantitative summaries of results from multiple studies to overcome limitations due to the typically small sample sizes of technical performance studies and/or to include a broader range of clinical settings and patient populations. This paper is a review of meta-analysis procedures for such an evaluation, including identification of suitable studies, statistical methodology to evaluate and summarize the performance metrics, and complete and transparent reporting of the results. This review addresses challenges typical of meta-analyses of technical performance, particularly small study sizes, which often causes violations of assumptions underlying standard meta-analysis techniques. Alternative approaches to address these difficulties are also presented; simulation studies indicate that they outperform standard techniques when some studies are small. The meta-analysis procedures presented are also applied to actual [18F]-fluorodeoxyglucose positron emission tomography (FDG-PET) test–retest repeatability data for illustrative purposes. PMID:24872353
Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)
ERIC Educational Resources Information Center
National Center for Systemic Improvement at WestEd, 2015
2015-01-01
This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, R.P.; Hazelton, R.F.
1984-12-01
A study was conducted to evaluate the technical and economic feasibility of using in-situ decontamination techniques to convert glove boxes and other large TRU-contaminated components directly into LLW. The results of the technical evaluation indicate that in-situ decontamination of these types of components to non-TRU levels is technically feasible. Applicable decontamination techniques include electropolishing, hand scrubbing, chemical washes/sprays, strippable coatings and Freon spray-cleaning. The removal of contamination from crevices and other holdup areas remains a problem, but may be solved through further advances in decontamination technology. Also, the increase in the allowable maximum TRU level from 10 nCi/g to 100more » nCi/g as defined in DOE Order 5820.2 reduces the removal requirement and facilitates measurement of the remaining quantities. The major emphasis of the study was on a cost/benefit evaluation that included a review and update of previous analyses and evaluations of TRU-waste volume reduction and conversion options. The results of the economic evaluation show, for the assumptions used, that there is a definite cost incentive to size reduce large components, and that decontamination of sectioned material has become cost competitive with the size reduction options. In-situ decontamination appears to be the lowest cost option when based on routine-type operations conducted by well-trained and properly equipped personnel. 16 references, 1 figure, 7 tables.« less
Technical Evaluation Motor No. 7 (TEM-07)
NASA Technical Reports Server (NTRS)
Hugh, Phil
1991-01-01
Technical Evaluation Motor Number 7 (TEM-7) was a full scale, full-duration static test firing of a high performance motor (HPM) configuration solid rocket motor (SRM) with nozzle vectoring. The static test fire occurred on 11 December 1990 at the Thiokol Corporation Static Test Bay T-97. Documented here are the procedures, performance, and results available through 22 January 1991. Critical post test hardware activities and assessment of the test data are not complete. A completed test report will be submitted 60 days after the test date. Included here is a presentation and discussion of the TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107 Revision A, Space Shuttle Technical Evaluation Motor number 7 (TEM-07) Static Fire Test Plan.
Using Corporate-Based Methods To Assess Technical Communication Programs.
ERIC Educational Resources Information Center
Faber, Brenton; Bekins, Linn; Karis, Bill
2002-01-01
Investigates methods of program assessment used by corporate learning sites and profiles value added methods as a way to both construct and evaluate academic programs in technical communication. Examines and critiques assessment methods from corporate training environments including methods employed by corporate universities and value added…
Technical aspects of cardiac PET/MRI.
Masuda, Atsuro; Nemoto, Ayaka; Takeishi, Yasuchika
2018-06-01
PET/MRI is a novel modality that enables to combine PET and MR images, and has significant potential to evaluate various cardiac diseases through the combination of PET molecular imaging and MRI functional imaging. Precise management of technical issues, however, is necessary for cardiac PET/MRI. This article describes several technical points, including patient preparation, MR attenuation correction, parallel acquisition of PET with MRI, clinical aspects, and image quality control.
Urology technical and non-technical skills development: the emerging role of simulation.
Rashid, Prem; Gianduzzo, Troy R J
2016-04-01
To review the emerging role of technical and non-technical simulation in urological education and training. A review was conducted to examine the current role of simulation in urology training. A PUBMED search of the terms 'urology training', 'urology simulation' and 'urology education' revealed 11,504 titles. Three hundred and fifty-seven abstracts were identified as English language, peer reviewed papers pertaining to the role of simulation in urology and related topics. Key papers were used to explore themes. Some cross-referenced papers were also included. There is an ongoing need to ensure that training time is efficiently utilised while ensuring that optimal technical and non-technical skills are achieved. Changing working conditions and the need to minimise patient harm by inadvertent errors must be taken into account. Simulation models for specific technical aspects have been the mainstay of graduated step-wise low and high fidelity training. Whole scenario environments as well as non-technical aspects can be slowly incorporated into the curriculum. Doing so should also help define what have been challenging competencies to teach and evaluate. Dedicated time, resources and trainer up-skilling are important. Concurrent studies are needed to help evaluate the effectiveness of introducing step-wise simulation for technical and non-technical competencies. Simulation based learning remains the best avenue of progressing surgical education. Technical and non-technical simulation could be used in the selection process. There are good economic, logistic and safety reasons to pursue the process of ongoing development of simulation co-curricula. While the role of simulation is assured, its progress will depend on a structured program that takes advantage of what can be delivered via this medium. Overall, simulation can be developed further for urological training programs to encompass technical and non-technical skill development at all stages, including recertification. © 2015 The Authors BJU International © 2015 BJU International Published by John Wiley & Sons Ltd.
2017-03-01
possible. The thesis also utilized organizational alignment literature to include organizational alignment principles in the evaluation. Key principles ...thesis also utilized organizational alignment literature to include organizational alignment principles in the evaluation. Key principles include 1...39 A. CORE PRINCIPLES ...............................................................................39 B. RELATIONSHIP OF CORE PRINCIPLES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-12-01
The results of the system definition studies conducted by NASA as a part of the Department of Energy/National Aeronautics and Space Administration SPS Concept Development and Evaluation Program are summarized. The purpose of the system definition efforts was to identify and define candidate SPS concepts and to evaluate the concepts in terms of technical and cost factors. Although the system definition efforts consisted primarily of evaluation and assessment of alternative technical approaches, a reference system was also defined to facilitate economic, environmental, and societal assessments by the Department of Energy. This reference system was designed to deliver 5 GW ofmore » electrical power to the utility grid. Topics covered include system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.« less
Code of Federal Regulations, 2012 CFR
2012-01-01
... eligible applicant desiring to receive financial assistance (either from DOE directly, through a State... coordinating agencies for financial assistance for technical assistance programs shall include the... energy use evaluation required by the State pursuant to § 455.20(k) for each building for which financial...
Code of Federal Regulations, 2010 CFR
2010-01-01
... eligible applicant desiring to receive financial assistance (either from DOE directly, through a State... coordinating agencies for financial assistance for technical assistance programs shall include the... energy use evaluation required by the State pursuant to § 455.20(k) for each building for which financial...
Code of Federal Regulations, 2011 CFR
2011-01-01
... eligible applicant desiring to receive financial assistance (either from DOE directly, through a State... coordinating agencies for financial assistance for technical assistance programs shall include the... energy use evaluation required by the State pursuant to § 455.20(k) for each building for which financial...
Code of Federal Regulations, 2014 CFR
2014-01-01
... eligible applicant desiring to receive financial assistance (either from DOE directly, through a State... coordinating agencies for financial assistance for technical assistance programs shall include the... energy use evaluation required by the State pursuant to § 455.20(k) for each building for which financial...
Code of Federal Regulations, 2013 CFR
2013-01-01
... eligible applicant desiring to receive financial assistance (either from DOE directly, through a State... coordinating agencies for financial assistance for technical assistance programs shall include the... energy use evaluation required by the State pursuant to § 455.20(k) for each building for which financial...
Outdoor Leadership Evaluation: Nature and Scope of the Problem.
ERIC Educational Resources Information Center
James, Leroy M.
Beyond the ability to exhibit good judgment and common sense while performing duties as a leader under stress and pressure, an outdoor adventure program leader should possess technical skills, human relations skills, and philosophical understanding of outdoor programming. Technical skills include knowledge of initiatives/ropes course activities,…
The 1991 International Conference on Aging Aircraft and Structural Airworthiness
NASA Technical Reports Server (NTRS)
Harris, Charles E. (Editor)
1992-01-01
Technical sessions of the conference included structural performance, nondestructive evaluation, maintenance and repair, international activities, and commuter airlines. Each session was organized to provide a well-rounded view of the subject from the industry, regulatory, and research perspective. Thirty-four presentations were given by the international technical community.
NASA Astrophysics Data System (ADS)
1982-05-01
The technical and economic feasibility of producing motor fuel alcohol from corn in a 100 million gallon per year plant to be constructed in Myrtle Grove, Louisiana is evaluated. The evaluation includes a detailed process design using proven technology, a capital cost estimate for the plant, a detailed analysis of the annual operating cost, a market study, a socioeconomic, environmental, health and safety analysis, and a complete financial analysis. Several other considerations for production of ethanol were evaluated including: cogeneration and fuel to be used in firing the boilers; single by-products vs. multiple by-products; and use of boiler flue gas for by-product drying.
Methodology for evaluation of railroad technology research projects
DOT National Transportation Integrated Search
1981-04-01
This Project memorandum presents a methodology for evaluating railroad research projects. The methodology includes consideration of industry and societal benefits, with special attention given to technical risks, implementation considerations, and po...
78 FR 14361 - Proposal Review; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... awards. The review and evaluation may also include assessment of the progress of awarded proposals. The... confidential nature, including technical information; financial data, such as salaries; and personal...
78 FR 54686 - Proposal Review; Notice of Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-05
... awards. The review and evaluation may also include assessment of the progress of awarded proposals. The... confidential nature, including technical information; financial data, such as salaries; and personal...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anastasia M. Gribik; Ronald E. Mizia; Harry Gatley
This project addresses both the technical and economic feasibility of replacing industrial gas in lime kilns with synthesis gas from the gasification of hog fuel. The technical assessment includes a materials evaluation, processing equipment needs, and suitability of the heat content of the synthesis gas as a replacement for industrial gas. The economic assessment includes estimations for capital, construction, operating, maintenance, and management costs for the reference plant. To perform these assessments, detailed models of the gasification and lime kiln processes were developed using Aspen Plus. The material and energy balance outputs from the Aspen Plus model were used asmore » inputs to both the material and economic evaluations.« less
48 CFR 1515.404-471 - EPA structured approach for developing profit or fee objectives.
Code of Federal Regulations, 2011 CFR
2011-10-01
... profit or fee objective. (5) The weight factors discussed in this section are designed for arriving at... involving creative design. (B) Consideration should be given to the managerial and technical efforts.../technical and general labor. Analysis of labor should include evaluation of the comparative quality and...
48 CFR 1515.404-471 - EPA structured approach for developing profit or fee objectives.
Code of Federal Regulations, 2013 CFR
2013-10-01
... profit or fee objective. (5) The weight factors discussed in this section are designed for arriving at... involving creative design. (B) Consideration should be given to the managerial and technical efforts.../technical and general labor. Analysis of labor should include evaluation of the comparative quality and...
48 CFR 1515.404-471 - EPA structured approach for developing profit or fee objectives.
Code of Federal Regulations, 2012 CFR
2012-10-01
... profit or fee objective. (5) The weight factors discussed in this section are designed for arriving at... involving creative design. (B) Consideration should be given to the managerial and technical efforts.../technical and general labor. Analysis of labor should include evaluation of the comparative quality and...
48 CFR 1515.404-471 - EPA structured approach for developing profit or fee objectives.
Code of Federal Regulations, 2014 CFR
2014-10-01
... profit or fee objective. (5) The weight factors discussed in this section are designed for arriving at... involving creative design. (B) Consideration should be given to the managerial and technical efforts.../technical and general labor. Analysis of labor should include evaluation of the comparative quality and...
48 CFR 1515.404-471 - EPA structured approach for developing profit or fee objectives.
Code of Federal Regulations, 2010 CFR
2010-10-01
... profit or fee objective. (5) The weight factors discussed in this section are designed for arriving at... involving creative design. (B) Consideration should be given to the managerial and technical efforts.../technical and general labor. Analysis of labor should include evaluation of the comparative quality and...
ERIC Educational Resources Information Center
Ohio State Dept. of Education, Columbus. Div. of Career-Technical and Adult Education.
This document presents the Ohio Integrated Technical and Academic Competency profile for marketing technology. The profile is to serve as the basis for curriculum development in Ohio's secondary, adult, and postsecondary programs. The profile includes a comprehensive listing of 580 specialty and foundation key indicators for evaluating mastery of…
A Critical Review of the Technical Characteristics of Current Preschool Screening Batteries
ERIC Educational Resources Information Center
Emmons, Michael R.; Alfonso, Vincent C.
2005-01-01
The current review provides a summary and evaluation of the technical characteristics of five preschool screening batteries, including the Brigance Screens, DIAL-3, ESI-R, ESP, and FirstSTEP. These norm-referenced instruments were selected on the basis of their commercial availability, description as a screening instrument, and ability to assess…
ERIC Educational Resources Information Center
Hansen, Mary A.; Lyon, Steven R.; Heh, Peter; Zigmond, Naomi
2013-01-01
Large-scale assessment programs, including alternate assessments based on alternate achievement standards (AA-AAS), must provide evidence of technical quality and validity. This study provides information about the technical quality of one AA-AAS by evaluating the standard setting for the science component. The assessment was designed to have…
48 CFR 315.307 - Proposal revisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... appropriate; and (2) An evaluation of technical factors by the technical evaluation panel, as necessary. The technical evaluation panel may rescore and re-rank technical proposals in the competitive range and prepare a technical evaluation report. To the extent practicable, the same evaluators who reviewed the...
ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment
NASA Technical Reports Server (NTRS)
Boor, J. L.; Braunstein, J.; Janky, J. M.; Ogden, D.; Potter, J. G.; Harper, E. L.; Volkmer, E.; Whalen, A. A.; Henderson, E.; Hupe, H. H.
1975-01-01
An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.
Economic Evaluation of Computerized Structural Analysis
NASA Technical Reports Server (NTRS)
Fortin, P. E.
1985-01-01
This completed effort involved a technical and economic study of the capabilities of computer programs in the area of structural analysis. The applicability of the programs to NASA projects and to other users was studied. The applications in other industries was explored including both research and development and applied areas. The costs of several alternative analysis programs were compared. A literature search covered applicable technical literature including journals, trade publications and books. In addition to the literature search, several commercial companies that have developed computerized structural analysis programs were contacted and their technical brochures reviewed. These programs include SDRC I-DEAS, MSC/NASTRAN, SCADA, SUPERSAP, NISA/DISPLAY, STAAD-III, MICAS, GTSTRUDL, and STARS. These programs were briefly reviewed as applicable to NASA projects.
NASA Technical Reports Server (NTRS)
Jones, W. L.
1974-01-01
A technical evaluation of the papers presented at a conference on escape systems for helicopters and V/STOL aircraft was made. The subjects discussed include the following: (1) bioengineering aspects of spinal injury during ejection, (2) aerodynamic forces acting on crewman during escape, (3) operational practicality of fly away ejection seats, (4) helicopter survivability requirements, (5) ejection experience from V/STOL aircraft, and (6) research projects involving escape and retrieval systems.
Traffic control device evaluation program : technical report.
DOT National Transportation Integrated Search
2015-03-01
This project provides the Texas Department of Transportation with a mechanism to quickly and effectively conduct : high-priority, limited scope evaluations of traffic control devices. Work during the 20132014 fiscal year included : three main task...
NASA Technical Reports Server (NTRS)
Boyd, W. E.; Harlan, J. C.
1981-01-01
A series of test products were developed from LANDSAT data sets for North Central Texas that paralleled the needs of ranchers, technical personnel, and the media. The products and evaluation questionnaires were mailed to approximately 150 ranchers who had reported an interest in evaluating the information systems. In addition to the rancher group, fourteen media people and a thirty-three member group in the agri business/technical community was also chosen to receive test products. The group responses are analyzed. Examples of the test products and associated questionnaires are included.
Can We Predict Technical Aptitude?: A Systematic Review.
Louridas, Marisa; Szasz, Peter; de Montbrun, Sandra; Harris, Kenneth A; Grantcharov, Teodor P
2016-04-01
To identify background characteristics and cognitive tests that may predict surgical trainees' future technical performance, and therefore be used to supplement existing surgical residency selection criteria. Assessment of technical skills is not commonly incorporated as part of the selection process for surgical trainees in North America. Emerging evidence, however, suggests that not all trainees are capable of reaching technical competence. Therefore, incorporating technical aptitude into selection processes may prove useful. A systematic search was carried out of the MEDLINE, PsycINFO, and Embase online databases to identify all studies that assessed associations between surrogate markers of innate technical abilities in surgical trainees, and whether these abilities correlate with technical performance. The quality of each study was evaluated using the Grading of Recommendations, Assessment, Development, and Evaluation system. A total of 8035 records were identified. After screening by title, abstract, and full text, 52 studies were included. Very few surrogate markers were found to predict technical performance. Significant associations with technical performance were seen for 1 of 23 participant-reported surrogate markers, 2 of 25 visual spatial tests, and 2 of 19 dexterity tests. The assessment of trainee Basic Performance Resources predicted technical performance in 62% and 75% of participants. To date, no single test has been shown to reliably predict the technical performance of surgical trainees. Strategies that rely on assessing multiple innate abilities, their interaction, and their relationship with technical skill may ultimately be more likely to serve as reliable predictors of future surgical performance.
Characterization of technical surfaces by structure function analysis
NASA Astrophysics Data System (ADS)
Kalms, Michael; Kreis, Thomas; Bergmann, Ralf B.
2018-03-01
The structure function is a tool for characterizing technical surfaces that exhibits a number of advantages over Fourierbased analysis methods. So it is optimally suited for analyzing the height distributions of surfaces measured by full-field non-contacting methods. The structure function is thus a useful method to extract global or local criteria like e. g. periodicities, waviness, lay, or roughness to analyze and evaluate technical surfaces. After the definition of line- and area-structure function and offering effective procedures for their calculation this paper presents examples using simulated and measured data of technical surfaces including aircraft parts.
FLAMMABLE GAS TECHNICAL BASIS DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
KRIPPS, L.J.
2005-02-18
This document describes the qualitative evaluation of frequency and consequences for double shell tank (DST) and single shell tank (SST) representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant SSCs and/or TSRS were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the needmore » for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.« less
Technical interventions to increase adenoma detection rate in colonoscopy.
Rondonotti, Emanuele; Andrealli, Alida; Amato, Arnaldo; Paggi, Silvia; Conti, Clara Benedetta; Spinzi, Giancarlo; Radaelli, Franco
2016-12-01
Adenoma detection rate (ADR) is the most robust colonoscopy quality metric and clinical studies have adopted it as the ideal method to assess the impact of technical interventions. Areas covered: We reviewed papers focusing on the impact of colonoscopy technical issues on ADR, including withdrawal time and technique, second evaluation of the right colon, patient positional changes, gastrointestinal assistant participation during colonoscopy, water-aided technique, optimization of bowel preparation and antispasmodic administration. Expert commentary: Overall, technical interventions are inexpensive, available worldwide and easy to implement. Some of them, such as the adoption of split dose regimen and slow scope withdrawal to allow a careful inspection, have been demonstrated to significantly improve ADR. Emerging data support the use of water-exchange colonoscopy. According to published studies, other technical interventions seem to provide only marginal benefit to ADR. Unfortunately, the available evidence has methodological limitations, such as small sample sizes, the inclusion of expert endoscopists only and the evaluation of single technical interventions. Additionally, larger studies are needed to clarify whether these interventions might have a higher benefit on low adenoma detectors and whether the implementation of a bundle of them, instead of a single technical maneuver, might have a greater impact on ADR.
Das Sprachlabor in der Schule (The Language Laboratory in Schools).
ERIC Educational Resources Information Center
Cabus, Hans-Joachim; Freudenstein, Reinhold
This technical manual for the use of language laboratories includes information on the following topics: (1) types of laboratories, (2) the tape, (3) the tape recorder, (4) other basic technical equipment, (5) the audio-active laboratory, the audio-active-compare laboratory, and an evaluation of the two, (6) possibilities for expanded use, (7)…
MDRC's Career and Technical Education Projects. Issue Focus
ERIC Educational Resources Information Center
MDRC, 2017
2017-01-01
The past decade has seen a resurgence of interest in career and technical education (CTE) as a way to engage students, help people build the skills necessary to succeed in a technologically advanced economy, and meet employer demand for workers. MDRC--which has a two-decade history of developing and evaluating CTE programs, including their…
Nondestructive Evaluation of Adhesively Bonded Joints
NASA Technical Reports Server (NTRS)
Nayeb-Hashemi, Hamid; Rossettos, J. N.
1997-01-01
The final report consists of 5 published papers in referred journals and a technical letter to the technical monitor. These papers include the following: (1) Comparison of the effects of debonds and voids in adhesive; (2) On the peak shear stresses in adhesive joints with voids; (3) Nondestructive evaluation of adhesively bonded joints by acousto-ultrasonic technique and acoustic emission; (4) Multiaxial fatigue life evaluation of tubular adhesively bonded joints; (5) Theoretical and experimental evaluation of the bond strength under peeling loads. The letter outlines the progress of the research. Also included is preliminary information on the study of nondestructive evaluation of composite materials subjected to localized heat damage. The investigators studied the effects of localized heat on unidirectional fiber glass epoxy composite panels. Specimens of the fiber glass epoxy composites were subjected to 400 C heat for varying lengths of time. The specimens were subjected to nondestructive tests. The specimens were then pulled to their failure and acoustic emission of these specimens were measured. The analysis of the data was continuing as of the writing of the letter, and includes a finite element stress analysis of the problem.
Methods in artificial insemination technology and fertility evaluation in poultry
USDA-ARS?s Scientific Manuscript database
The symposium will include an in-depth review and hands-on demonstrations of selected methodologies in AI technology and fertility evaluation. The symposium is geared for commercial farm and hatchery technical staffs and research lab personnel....
Laser Lights or Dim Bulbs? Evaluating Reference Librarians' Use of Electronic Sources.
ERIC Educational Resources Information Center
Welch, Jeanie M.
1999-01-01
Discusses the evaluation of academic library reference librarians' effectiveness in providing services to patrons using electronic sources based on experiences at the University of North Carolina at Charlotte. Topics include core technical competencies for subject specialists and reference desk service; the Internet; and methods of evaluation.…
Quality Control in Title I Evaluation: Problems and Approaches.
ERIC Educational Resources Information Center
Hansen, Joe B.
Educational program evalaution is subject to many difficulties. Problems with evaluation include such conceptual problems as: (1) understanding of decisions to be made; (2) adequate definition; (3) consensus on values and criteria; (4) coordination among administrative levels; and (5) use of an appropriate evaluation model. Technical problems…
ERIC Educational Resources Information Center
Repp, Charles A.; Brach, Ronald C.
The manual provides a rationale, procedural guidelines, time-schedules, instruments, and supporting documentation for student services program evaluation at SUNY Agricultural and Technical College, Delhi. Six procedural guidelines include: (1) all programs and services should be evaluated at least once every four years, with provision for annual…
Procurement engineering - the productivity factor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bargerstock, S.B.
1993-01-01
The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less
Brunckhorst, Oliver; Shahid, Shahab; Aydin, Abdullatif; McIlhenny, Craig; Khan, Shahid; Raza, Syed Johar; Sahai, Arun; Brewin, James; Bello, Fernando; Kneebone, Roger; Khan, Muhammad Shamim; Dasgupta, Prokar; Ahmed, Kamran
2015-09-01
Current training modalities within ureteroscopy have been extensively validated and must now be integrated within a comprehensive curriculum. Additionally, non-technical skills often cause surgical error and little research has been conducted to combine this with technical skills teaching. This study therefore aimed to develop and validate a curriculum for semi-rigid ureteroscopy, integrating both technical and non-technical skills teaching within the programme. Delphi methodology was utilised for curriculum development and content validation, with a randomised trial then conducted (n = 32) for curriculum evaluation. The developed curriculum consisted of four modules; initially developing basic technical skills and subsequently integrating non-technical skills teaching. Sixteen participants underwent the simulation-based curriculum and were subsequently assessed, together with the control cohort (n = 16) within a full immersion environment. Both technical (Time to completion, OSATS and a task specific checklist) and non-technical (NOTSS) outcome measures were recorded with parametric and non-parametric analyses used depending on the distribution of our data as evaluated by a Shapiro-Wilk test. Improvements within the intervention cohort demonstrated educational value across all technical and non-technical parameters recorded, including time to completion (p < 0.01), OSATS scores (p < 0.001), task specific checklist scores (p = 0.011) and NOTSS scores (p < 0.001). Content validity, feasibility and acceptability were all demonstrated through curriculum development and post-study questionnaire results. The current developed curriculum demonstrates that integrating both technical and non-technical skills teaching is both educationally valuable and feasible. Additionally, the curriculum offers a validated simulation-based training modality within ureteroscopy and a framework for the development of other simulation-based programmes.
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
ERIC Educational Resources Information Center
Niculovic, Milica; Zivkovic, Dragana; Manasijevic, Dragan; Strbac, Nada
2012-01-01
A large number of criteria for evaluating Internet addiction have been developed recently. The research of Internet addiction among students of the Technical faculty in Bor, University of Belgrade has been conducted and its results are presented in this paper. The study included 270 students using criteria of Young's Internet Addiction Test. In…
Evaluating Documents Reference Service and the Implications for Improvement.
ERIC Educational Resources Information Center
Parker, June D.
1996-01-01
Presents an evaluation of reference services and government document use at East Carolina University (North Carolina) library. Factors that most affect retrieval success include cataloging and technical problems, the amount of time spent in searching, and staff knowledge. (Author/AEF)
Smith, M.; Murphy, D.; Laxmisan, A.; Sittig, D.; Reis, B.; Esquivel, A.; Singh, H.
2013-01-01
Summary Background Abnormal test results do not always receive timely follow-up, even when providers are notified through electronic health record (EHR)-based alerts. High workload, alert fatigue, and other demands on attention disrupt a provider’s prospective memory for tasks required to initiate follow-up. Thus, EHR-based tracking and reminding functionalities are needed to improve follow-up. Objectives The purpose of this study was to develop a decision-support software prototype enabling individual and system-wide tracking of abnormal test result alerts lacking follow-up, and to conduct formative evaluations, including usability testing. Methods We developed a working prototype software system, the Alert Watch And Response Engine (AWARE), to detect abnormal test result alerts lacking documented follow-up, and to present context-specific reminders to providers. Development and testing took place within the VA’s EHR and focused on four cancer-related abnormal test results. Design concepts emphasized mitigating the effects of high workload and alert fatigue while being minimally intrusive. We conducted a multifaceted formative evaluation of the software, addressing fit within the larger socio-technical system. Evaluations included usability testing with the prototype and interview questions about organizational and workflow factors. Participants included 23 physicians, 9 clinical information technology specialists, and 8 quality/safety managers. Results Evaluation results indicated that our software prototype fit within the technical environment and clinical workflow, and physicians were able to use it successfully. Quality/safety managers reported that the tool would be useful in future quality assurance activities to detect patients who lack documented follow-up. Additionally, we successfully installed the software on the local facility’s “test” EHR system, thus demonstrating technical compatibility. Conclusion To address the factors involved in missed test results, we developed a software prototype to account for technical, usability, organizational, and workflow needs. Our evaluation has shown the feasibility of the prototype as a means of facilitating better follow-up for cancer-related abnormal test results. PMID:24155789
Smith, M; Murphy, D; Laxmisan, A; Sittig, D; Reis, B; Esquivel, A; Singh, H
2013-01-01
Abnormal test results do not always receive timely follow-up, even when providers are notified through electronic health record (EHR)-based alerts. High workload, alert fatigue, and other demands on attention disrupt a provider's prospective memory for tasks required to initiate follow-up. Thus, EHR-based tracking and reminding functionalities are needed to improve follow-up. The purpose of this study was to develop a decision-support software prototype enabling individual and system-wide tracking of abnormal test result alerts lacking follow-up, and to conduct formative evaluations, including usability testing. We developed a working prototype software system, the Alert Watch And Response Engine (AWARE), to detect abnormal test result alerts lacking documented follow-up, and to present context-specific reminders to providers. Development and testing took place within the VA's EHR and focused on four cancer-related abnormal test results. Design concepts emphasized mitigating the effects of high workload and alert fatigue while being minimally intrusive. We conducted a multifaceted formative evaluation of the software, addressing fit within the larger socio-technical system. Evaluations included usability testing with the prototype and interview questions about organizational and workflow factors. Participants included 23 physicians, 9 clinical information technology specialists, and 8 quality/safety managers. Evaluation results indicated that our software prototype fit within the technical environment and clinical workflow, and physicians were able to use it successfully. Quality/safety managers reported that the tool would be useful in future quality assurance activities to detect patients who lack documented follow-up. Additionally, we successfully installed the software on the local facility's "test" EHR system, thus demonstrating technical compatibility. To address the factors involved in missed test results, we developed a software prototype to account for technical, usability, organizational, and workflow needs. Our evaluation has shown the feasibility of the prototype as a means of facilitating better follow-up for cancer-related abnormal test results.
Assessment of technical and nontechnical skills in surgical residents.
Ponton-Carss, Alicia; Kortbeek, John B; Ma, Irene W Y
2016-11-01
Surgical competence encompasses both technical and nontechnical skills. This study seeks to evaluate the validity evidence for a comprehensive surgical skills examination and to examine the relationship between technical and nontechnical skills. Six examination stations assessing both technical and nontechnical skills, conducted yearly for surgical trainees (n = 120) between 2010 and 2014 are included. The assessment tools demonstrated acceptable internal consistency. Interstation reliability for technical skills was low (alpha = .39). Interstation reliability for the nontechnical skills was lower (alpha range -.05 to .31). Nontechnical skills domains were strongly correlated, ranging from r = .65, P < .001 to .86, P < .001. The associations between nontechnical and technical skills were inconsistent, ranging from poor (r = -.06; P = .54) to moderate (r = .45; P < .001). Multiple samplings of integrated technical and nontechnical skills are necessary to assess overall surgical competency. Copyright © 2016 Elsevier Inc. All rights reserved.
Bors, Philip A; Kemner, Allison; Fulton, John; Stachecki, Jessica; Brennan, Laura K
2015-01-01
As part of Robert Wood Johnson Foundation's Healthy Kids, Healthy Communities (HKHC) national grant program, a technical assistance team designed the HKHC Community Dashboard, an online progress documentation and networking system. The Dashboard was central to HKHC's multimethod program evaluation and became a communication interface for grantees and technical assistance providers. The Dashboard was designed through an iterative process of identifying needs and priorities; designing the user experience, technical development, and usability testing; and applying visual design. The system was created with an open-source content management system and support for building an online community of users. The site developer trained technical assistance providers at the national program office and evaluators, who subsequently trained all 49 grantees. Evaluators provided support for Dashboard users and populated the site with the bulk of its uploaded tools and resource documents. The system tracked progress through an interactive work plan template, regular documentation by local staff and partners, and data coding and analysis by the evaluation team. Other features included the ability to broadcast information to Dashboard users via e-mail, event calendars, discussion forums, private messaging, a resource clearinghouse, a technical assistance diary, and real-time progress reports. The average number of Dashboard posts was 694 per grantee during the grant period. Technical assistance providers and grantees uploaded a total of 1304 resource documents. The Dashboard functions with the highest grantee satisfaction were its interfaces for sharing and progress documentation. A majority of Dashboard users (69%) indicated a preference for continued access to the Dashboard's uploaded resource documents. The Dashboard was a useful and innovative tool for participatory evaluation of a large national grant program. While progress documentation added some burden to local project staff, the system proved to be a useful resource-sharing technology.
Code of Federal Regulations, 2010 CFR
2010-10-01
... potential phase-two technical evaluation factors include design concepts, management approach, key personnel... OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Two-Phase Design-Build Selection...
Formation evaluation in liquid-dominated geothermal reservoirs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ershaghi, I.; Dougherty, E.E.; Handy, L.L.
1981-04-01
Studies relative to some formation evaluation aspects of geothermal reservoirs are reported. The particular reservoirs considered were the liquid dominated type with a lithology of the sedimentary nature. Specific problems of interest included the resistivity behavior of brines and rocks at elevated temperatures and studies on the feasibility of using the well log resistivity data to obtain estimates of reservoir permeability. Several papers summarizing the results of these studies were presented at various technical meetings for rapid dissemination of the results to potential users. These papers together with a summary of data most recently generated are included. A brief reviewmore » of the research findings precedes the technical papers. Separate abstracts were prepared for four papers. Five papers were abstracted previously for EDB.« less
The evaluator as technical assistant: A model for systemic reform support
NASA Astrophysics Data System (ADS)
Century, Jeanne Rose
This study explored evaluation of systemic reform. Specifically, it focused on the evaluation of a systemic effort to improve K-8 science, mathematics and technology education. The evaluation was of particular interest because it used both technical assistance and evaluation strategies. Through studying the combination of these roles, this investigation set out to increase understanding of potentially new evaluator roles, distinguish important characteristics of the evaluator/project participant relationship, and identify how these roles and characteristics contribute to effective evaluation of systemic science education reform. This qualitative study used interview, document analysis, and participant observation as methods of data collection. Interviews were conducted with project leaders, project participants, and evaluators and focused on the evaluation strategies and process, the use of the evaluation, and technical assistance. Documents analyzed included transcripts of evaluation team meetings and reports, memoranda and other print materials generated by the project leaders and the evaluators. Data analysis consisted of analytic and interpretive procedures consistent with the qualitative data collected and entailed a combined process of coding transcripts of interviews and meetings, field notes, and other documents; analyzing and organizing findings; writing of reflective and analytic memos; and designing and diagramming conceptual relationships. The data analysis resulted in the development of the Multi-Function Model for Systemic Reform Support. This model organizes systemic reform support into three functions: evaluation, technical assistance, and a third, named here as "systemic perspective." These functions work together to support the project's educational goals as well as a larger goal--building capacity in project participants. This model can now serve as an informed starting point or "blueprint" for strategically supporting systemic reform.
Due diligence responsibilities of the professional geologist
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hobbs, G.W.
1991-03-01
Whether in the role of independent consultant or company employee, a geologist has certain professional obligations in the evaluation of an oil and gas submittal from a third party. 'Due diligence' is the term used to describe the analysis of an investment opportunity. Due diligence involves a multidisciplinary examination of both the technical and business aspects of a submittal. In addition to the obvious geological considerations, prospect evaluations should include relevant details about the specific technical documentation reviewed, information sources, and how the data were verified. Full disclosure of ownership, technical risks, and negative aspects of the prospect should bemore » included along with the positive elements. After the geological analysis is completed, the economic merits of the prospect should be analyzed, incorporating all lease burdens and terms of participation into the calculations. Estimated exploration, development, and operating costs, together with projected annual production, cash flow, and reserves must be examined as to their reasonableness. Finally, the due diligence review should include a thorough check on the reputation, financial condition, technical and managerial expertise, and prior track record of the operator. Bank, trade, legal, and prior partner references should be contacted. The successful professional geologist in today's competitive world must have multidisciplinary skills. A solid background in geology and geophysics, a basic understanding of the principles of petroleum engineering and economics, and the wits of a private eye are needed for good due diligence work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
The National Center for Improving Science Education has undertaken activities to achieve evaluation goals for DOE`s Precollege programs: develop means to determine program quality; develop means for determining the contribution of DOE precollege programs to both teacher enhancement and student achievement; provide evaluation designs and instruments and reports of program quality and impact; and strengthen both DOE`s and the Labs` capacity to do both short- and long-term planning as well as deliver effective programs and evaluation. Appendices include evaluation/technical assistance report, profiling teacher research participation and teacher development programs, teacher surveys, impact assessment design, and teacher research participation programs anecdotesmore » for 8 labs.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Office of Planning, Evaluation and..., including technical assistance to improve the quality of evaluations and performance reporting; and how to.... Department of Education, 400 Maryland Avenue SW., LBJ, Washington, DC 20202-4537. Copies of the proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Office of Planning, Evaluation and..., including technical assistance to improve the quality of evaluations and performance reporting; and how to.... Department of Education, 400 Maryland Avenue SW, LBJ, Washington, DC 20202-4537. Copies of the proposed...
Evaluation of the Illinois High School to College Success Report: Technical Report
ERIC Educational Resources Information Center
Klostermann, Brenda; Cameron, Sean; Hamel, Rachel; Newberry, Melissa
2013-01-01
This report provides findings from an evaluation of the newly designed Illinois High School to College Success Report (HS2CSR). The evaluation study examined the dissemination, usefulness, and impact on collaborative efforts of the new HS2CSR. Education stakeholders' suggestions for improving the report are also included. Recommendations to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
de Boer, Gijs; Lawrence, Dale; Palo, Scott
2017-03-29
This final technical report details activities undertaken as part of the referenced project. Included is information on the preparation of aircraft for deployment to Alaska, summaries of the three deployments covered under this project, and a brief description of the dataset and science directions pursued. Additionally, we provide information on lessons learned, publications, and presentations resulting from this work.
ERIC Educational Resources Information Center
Innovative Systems Research, Inc., Pennsauken, NJ.
Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…
A Review on Technical and Clinical Impact of Microsoft Kinect on Physical Therapy and Rehabilitation
Mousavi Hondori, Hossein; Khademi, Maryam
2014-01-01
This paper reviews technical and clinical impact of the Microsoft Kinect in physical therapy and rehabilitation. It covers the studies on patients with neurological disorders including stroke, Parkinson's, cerebral palsy, and MS as well as the elderly patients. Search results in Pubmed and Google scholar reveal increasing interest in using Kinect in medical application. Relevant papers are reviewed and divided into three groups: (1) papers which evaluated Kinect's accuracy and reliability, (2) papers which used Kinect for a rehabilitation system and provided clinical evaluation involving patients, and (3) papers which proposed a Kinect-based system for rehabilitation but fell short of providing clinical validation. At last, to serve as technical comparison to help future rehabilitation design other sensors similar to Kinect are reviewed. PMID:27006935
NASA Technical Reports Server (NTRS)
1980-01-01
Candidate satellite power system (SPS) concepts were identified and evaluated in terms of technical and cost factors. A number of alternative technically feasible approaches and system concepts were investigated. A reference system was defined to facilitate economic, environmental, and societal assessments by the Department of Energy. All elements of the reference system were defined including the satellite and all its subsystems, the orbital construction and maintenance bases, all elements of the space transportation system, the ground receiving station, and the associated industrial facilities for manufacturing the required hardware. The reference conclusions and remaining issues are stated for the following topical areas: system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.
Mousavi Hondori, Hossein; Khademi, Maryam
2014-01-01
This paper reviews technical and clinical impact of the Microsoft Kinect in physical therapy and rehabilitation. It covers the studies on patients with neurological disorders including stroke, Parkinson's, cerebral palsy, and MS as well as the elderly patients. Search results in Pubmed and Google scholar reveal increasing interest in using Kinect in medical application. Relevant papers are reviewed and divided into three groups: (1) papers which evaluated Kinect's accuracy and reliability, (2) papers which used Kinect for a rehabilitation system and provided clinical evaluation involving patients, and (3) papers which proposed a Kinect-based system for rehabilitation but fell short of providing clinical validation. At last, to serve as technical comparison to help future rehabilitation design other sensors similar to Kinect are reviewed.
Can Value Added Add Value to Teacher Evaluation?
ERIC Educational Resources Information Center
Darling-Hammond, Linda
2015-01-01
The five thoughtful papers included in this issue of "Educational Researcher" ("ER") raise new questions about the use of value-added methods (VAMs) to estimate teachers' contributions to students' learning as part of personnel evaluation. The papers address both technical and implementation concerns, considering potential…
Durability of saw-cut joints in plain cement concrete pavements : [technical summary].
DOT National Transportation Integrated Search
2011-01-01
The main objective of this study was to evaluate factors influencing the durability of the joints in portland cement concrete pavement in the state of Indiana. : The scope of the research included the evaluation of the absorption of water in concrete...
Ribera, Josep M; Cardellach, Francesc; Selva, Albert
2005-12-01
The decision-making process includes a series of activities undertaken in biomedical journals from the moment a manuscript is received until it is accepted or rejected. Firstly, the manuscript is evaluated by the members of the Editorial Board, who analyze both its suitability for the journal and its scientific quality. After this initial evaluation, the article is evaluated by peer reviewers, an essential process to guarantee its scientific validity. Both the Editorial Board and the peer reviewers usually use checklists which are of enormous help in this task. Once the biomedical article has been accepted, the publication process is started, which in turn includes a series of steps, beginning with technical and medical review of the article's contents and ending with the article's publication in the journal. The present article provides a detailed description of the main technical and ethical issues involved in the processes of decision-making and publication of biomedical articles.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUECK, K.J.
2004-10-18
This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Feasibility Analysis covers a wide range of studies and evaluations. The Report is divided into five parts. Section 1 contains all material relating to the Institutional Assessment including consideration of the requirements and position of the Potomac Electric Co. as they relate to cogeneration at Georgetown in parallel with the utility (Task 1). Sections 2 through 7 contain all technical information relating to the Alternative Subsystems Analysis (Task 4). This includes the energy demand profiles upon which the evaluations were based (Task 3). It further includes the results of the Life-Cycle-Cost Analyses (Task 5) which are developed in detailmore » in the Appendix for evaluation in the Technical Report. Also included is the material relating to Incremental Savings and Optimization (Task 6) and the Conceptual Design for candidate alternate subsystems (Task 7). Section 8 contains all material relating to the Environmental Impact Assessment (Task 2). The Appendix contains supplementary material including the budget cost estimates used in the life-cycle-cost analyses, the basic assumptions upon which the life-cycle analyses were developed, and the detailed life-cycle-cost anlysis for each subsystem considered in detail.« less
Personal Consumerism. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Smizer, Janet; And Others
This courseware evaluation rates the "Personal Consumerism" program developed by Aquarius People Materials. (The eight-program series--not contained in this document--includes understanding labels, consumer help, consumer fraud, consumer law, comparative shopping, consumerism and you, reading an advertisement, and tips on buying a used…
Selecting Students at Risk of Academic Difficulties
ERIC Educational Resources Information Center
Cummings, Kelli D.; Smolkowski, Keith
2015-01-01
This paper aims to translate for practitioners the principles and methods for evaluating screening measures in education, including benchmark goals and cut points, from our technical manuscript "Evaluation of Diagnostic Systems: The Selection of Students at Risk of Academic Difficulties" (this issue). We offer a brief description of…
ERIC Educational Resources Information Center
Americans for Indian Opportunity, Inc., Albuquerque, NM.
Included in this report on the 1977 Title IV Part A Technical Assistance conference held in Albuquerque are: (1) a descriptive narrative of conference events; (2) a summary of the 120 evaluation responses; and (3) the resolutions adopted by conference participants as a specific vehicle to make their concerns known to the Office of Indian Education…
ERIC Educational Resources Information Center
Anderson, Daniel; Alonzo, Julie; Tindal, Gerald
2012-01-01
In this technical report, we describe the results of a study of mathematics items written to align with the Common Core State Standards (CCSS) in grades 6-8. In each grade, CCSS items were organized into forms, and the reliability of these forms was evaluated along with an experimental form including items aligned with the National Council of…
Kang, T W; Lee, M W; Hye, M J; Song, K D; Lim, S; Rhim, H; Lim, H K; Cha, D I
2014-12-01
To evaluate the technical feasibility of artificial ascites formation using an angiosheath before percutaneous radiofrequency ablation (RFA) for hepatic tumours and to determine predictive factors affecting the technical failure of artificial ascites formation. This retrospective study was approved by the institutional review board. One hundred and thirteen patients underwent percutaneous RFA of hepatic tumours after trying to make artificial ascites using an angiosheath to avoid collateral thermal damage. The technical success rate of making artificial ascites using an angiosheath and conversion rate to other techniques after initial failure of making artificial ascites were evaluated. The technical success rate for RFA was assessed. In addition, potential factors associated with technical failure including previous history of transcatheter arterial chemoembolization (TACE) or RFA, type of abdominal surgery, and adjacent perihepatic structures were reviewed. Predictive factors for the technical failure of artificial ascites formation were analysed using multivariate analysis. The technical success rates of artificial ascites formation by angiosheath and that of RFA were 84.1% (95/113) and 97.3% (110/113), respectively. The conversion rate to other techniques after the failure of artificial ascites formation using an angiosheath was 15.9% (18/113). Previous hepatic resection was the sole independent predictive factor affecting the technical failure of artificial ascites formation (p<0.001, odds ratio = 29.03, 95% confidence interval: 4.56-184.69). Making artificial ascites for RFA of hepatic tumours using an angiosheath was technically feasible in most cases. However, history of hepatic resection was a significant predictive factor affecting the technical failure of artificial ascites formation. Copyright © 2014 The Royal College of Radiologists. Published by Elsevier Ltd. All rights reserved.
Mark 4A project training evaluation
NASA Technical Reports Server (NTRS)
Stephenson, S. N.
1985-01-01
A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.
Technical assistance for law-enforcement communications: Grant summary
NASA Technical Reports Server (NTRS)
Reilly, N. B.
1979-01-01
A summary overview of project activities and results are presented. The goals and objectives are reviewed and a description of the approaches used to attain them is given. The feedback received from the seminars conducted as part of the project, and results from a questionnaire about the project are included. Significant findings of the project in such areas as radio channel loading, dispatch system design, training and technology transfer are discussed. Several specific problem areas are identified and evaluated. Specific recommendations for future technical assistance efforts are presented along with an inventory of technical-assistance reports generated throughout the project.
Mendiratta-Lala, Mishal; Williams, Todd R; Mendiratta, Vivek; Ahmed, Hafeez; Bonnett, John W
2015-04-01
The purpose of this study was to evaluate the effectiveness of a multifaceted simulation-based resident training for CT-guided fluoroscopic procedures by measuring procedural and technical skills, radiation dose, and procedure times before and after simulation training. A prospective analysis included 40 radiology residents and eight staff radiologists. Residents took an online pretest to assess baseline procedural knowledge. Second-through fourth-year residents' baseline technical skills with a procedural phantom were evaluated. First-through third-year residents then underwent formal didactic and simulation-based procedural and technical training with one of two interventional radiologists and followed the training with 1 month of supervised phantom-based practice. Thereafter, residents underwent final written and practical examinations. The practical examination included essential items from a 20-point checklist, including site and side marking, consent, time-out, and sterile technique along with a technical skills portion assessing pedal steps, radiation dose, needle redirects, and procedure time. The results indicated statistically significant improvement in procedural and technical skills after simulation training. For residents, the median number of pedal steps decreased by three (p=0.001), median dose decreased by 15.4 mGy (p<0.001), median procedure time decreased by 4.0 minutes (p<0.001), median number of needle redirects decreased by 1.0 (p=0.005), and median number of 20-point checklist items successfully completed increased by three (p<0.001). The results suggest that procedural skills can be acquired and improved by simulation-based training of residents, regardless of experience. CT simulation training decreases procedural time, decreases radiation dose, and improves resident efficiency and confidence, which may transfer to clinical practice with improved patient care and safety.
A Socio-Technical Analysis of Patient Accessible Electronic Health Records.
Hägglund, Maria; Scandurra, Isabella
2017-01-01
In Sweden, and internationally, there is a movement towards increased transparency in healthcare including giving patients online access to their electronic health records (EHR). The purpose of this paper is to analyze the Swedish patient accessible EHR (PAEHR) service using a socio-technical framework, to increase the understanding of factors that influence the design, implementation, adoption and use of the service. Using the Sitting and Singh socio-technical framework as a basis for analyzing the Swedish PAEHR system and its context indicated that there are many stakeholders engaged in these types of services, with different driving forces and incentives that may influence the adoption and usefulness of PAEHR services. The analysis was useful in highlighting important areas that need to be further explored in evaluations of PAEHR services, and can act as a guide when planning evaluations of any PAEHR service.
Technical refinements to improve outcomes following distal hypospadias repair.
Lacy, John M; Hendrix, Lauren N; Bole, Raevti; Habib, Enmar; Wootton, Cole W; Ziada, Ali M
2016-02-01
Hypospadias complications, most notably meatal stenosis, are commonly reported to occur after tubularized incised plate (TIP) hypospadias repair. We focus on a point of technique in TIP repair and its effect on outcome of this possible complication, as well as other commonly reported complications. Meatal stenosis after TIP can be avoided if the urethra and overlying glans are dissected and sutured separately with no attempt at cross suturing whether the urethra ends below, behind, or above the glans sutures. This hypothesis was evaluated by a prospective data collection before and after implementation to evaluate the effect of a technical refinement on rates of meatal stenosis in TIP hypospadias repair. All cases of coronal to midpenile hypospadias repair during two periods were included in our study. Group 1 included 140 consecutive patients over a 30 month period. Group 2 included 122 consecutive patients over a 36 month period during which the above mentioned technical changes were implemented by all participating pediatric urologists. Rates of complications between the two groups were compared with special emphasis on meatal stenosis. Median follow up for both groups was > 1 year. Overall complication rate in Group 1 was 31.5% compared to 9.8% in Group 2. Meatal stenosis was significantly reduced from 13 patients (9.3%) in Group 1 to 2 patients (1.6%) in Group 2, p = 0.008. The technical refinements described resulted in reduction of complication rates and a decrease in incidence of meatal stenosis.
Combustion: an oil spill mitigation tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-11-01
The technical feasibility of using combustion as an oil spill mitigation tool was studied. Part I of the two-part report is a practical guide oriented toward the needs of potential users, while Part II is the research or resource document from which the practical guidance was drawn. The study included theoretical evaluations of combustion of petroleum pool fires under the effects of weathering and an oil classification system related to combustion potential. The theoretical analysis of combustion is balanced by practical experience of oil burning and case history information. Decision elements are provided which can be used as a guidemore » for technical evaluations of a particular oil spill situation. The rationale for assessing technical feasibility is given in the context of other alternatives available for response to an oil spill. A series of research and technology development concepts are included for future research. The ethics of using oil burning are discussed as issues, concerns, and tradeoffs. A detailed annotated bibliography is appended along with a capsule review of a decade of oil burning studies and other support information.« less
What Today's Educational Technology Needs: Defensible Evaluations and Realistic Implementation.
ERIC Educational Resources Information Center
Roweton, William E.; And Others
It is argued that in order to make computer assisted instruction effective in the schools, educators should pay more attention to implementation issues (including modifying teacher attitudes, changing classroom routines, and offering realistic technical training and support) and to producing understandable product and performance evaluations.…
Caffeine. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. National Center for Research in Vocational Education.
This courseware evaluation rates the "Caffeine" program developed by Lane Community College and sold by the Oregon Department of Education. (The program--not included in this document--is part of a computer-assisted instruction project with nursing applications.) Part A describes "Caffeine" in terms of topics (food and…
Nutri-Calc. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Biddle, James; And Others
This courseware evaluation rates the Nutri-Calc microcomputer program developed by CAMDE of Tempe, Arizona. (The program--not included in this document--consists of Nutri-Calc, which calculates total nutritional intake and Recommended Daily Allowances, and Calorie-Magic, which calculates individual ideal caloric intake.) Part A describes…
DOT National Transportation Integrated Search
1980-10-01
This report describes the methods used in the evaluation of a new continuous-flow, phase-dilution passenger oxygen mask for compliance to FAA technical Standard Order (TSO)-C64 requirements. Data presented include end expiratory partial pressures for...
48 CFR 1352.215-70 - Proposal preparation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be... time each individual will be available for this project, and, if necessary, explain why the key person... person or labor category including number of labor-hours and current actual average hourly rates based on...
48 CFR 1352.215-70 - Proposal preparation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be... time each individual will be available for this project, and, if necessary, explain why the key person... person or labor category including number of labor-hours and current actual average hourly rates based on...
48 CFR 1352.215-70 - Proposal preparation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be... time each individual will be available for this project, and, if necessary, explain why the key person... person or labor category including number of labor-hours and current actual average hourly rates based on...
ERIC Educational Resources Information Center
Turner, Gordon; And Others
This courseware evaluation rates a set of 25 industrial education general software programs developed by the Iowa Department of Public Instruction. (These programs--not contained in this document--include measurement drill, fraction drill, loan and interest cost analysis, assault vehicle speeds, sun's rays, Ohm's law, concrete calculations, roof…
Wood Programs. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Kaylor, Robert; And Others
This courseware evaluation rates the Wood Programs software developed by the Iowa Department of Public Instruction. (These programs--not contained in this document--include understanding board feet, wood characteristics, wood safety drill, wood dimensions, wood moisture, operating the table saw, radial arm, measurement drill, fraction drill, and…
ERIC Educational Resources Information Center
Sarle, Ruth; And Others
This courseware evaluation rates the "Microcomputer Applications in Vocational Education: Home Economics" program developed by the Illinois State Board of Education. (This series of programs--not contained in this document--includes interior decorating estimating, pounds away program, decision analysis, fiber care, clothing figure…
Murphy, Thomas; Schwedock, Julie; Nguyen, Kham; Mills, Anna; Jones, David
2015-01-01
New recommendations for the validation of rapid microbiological methods have been included in the revised Technical Report 33 release from the PDA. The changes include a more comprehensive review of the statistical methods to be used to analyze data obtained during validation. This case study applies those statistical methods to accuracy, precision, ruggedness, and equivalence data obtained using a rapid microbiological methods system being evaluated for water bioburden testing. Results presented demonstrate that the statistical methods described in the PDA Technical Report 33 chapter can all be successfully applied to the rapid microbiological method data sets and gave the same interpretation for equivalence to the standard method. The rapid microbiological method was in general able to pass the requirements of PDA Technical Report 33, though the study shows that there can be occasional outlying results and that caution should be used when applying statistical methods to low average colony-forming unit values. Prior to use in a quality-controlled environment, any new method or technology has to be shown to work as designed by the manufacturer for the purpose required. For new rapid microbiological methods that detect and enumerate contaminating microorganisms, additional recommendations have been provided in the revised PDA Technical Report No. 33. The changes include a more comprehensive review of the statistical methods to be used to analyze data obtained during validation. This paper applies those statistical methods to analyze accuracy, precision, ruggedness, and equivalence data obtained using a rapid microbiological method system being validated for water bioburden testing. The case study demonstrates that the statistical methods described in the PDA Technical Report No. 33 chapter can be successfully applied to rapid microbiological method data sets and give the same comparability results for similarity or difference as the standard method. © PDA, Inc. 2015.
Regenbogen, Scott E; Greenberg, Caprice C; Studdert, David M; Lipsitz, Stuart R; Zinner, Michael J; Gawande, Atul A
2007-11-01
To identify the most prevalent patterns of technical errors in surgery, and evaluate commonly recommended interventions in light of these patterns. The majority of surgical adverse events involve technical errors, but little is known about the nature and causes of these events. We examined characteristics of technical errors and common contributing factors among closed surgical malpractice claims. Surgeon reviewers analyzed 444 randomly sampled surgical malpractice claims from four liability insurers. Among 258 claims in which injuries due to error were detected, 52% (n = 133) involved technical errors. These technical errors were further analyzed with a structured review instrument designed by qualitative content analysis. Forty-nine percent of the technical errors caused permanent disability; an additional 16% resulted in death. Two-thirds (65%) of the technical errors were linked to manual error, 9% to errors in judgment, and 26% to both manual and judgment error. A minority of technical errors involved advanced procedures requiring special training ("index operations"; 16%), surgeons inexperienced with the task (14%), or poorly supervised residents (9%). The majority involved experienced surgeons (73%), and occurred in routine, rather than index, operations (84%). Patient-related complexities-including emergencies, difficult or unexpected anatomy, and previous surgery-contributed to 61% of technical errors, and technology or systems failures contributed to 21%. Most technical errors occur in routine operations with experienced surgeons, under conditions of increased patient complexity or systems failure. Commonly recommended interventions, including restricting high-complexity operations to experienced surgeons, additional training for inexperienced surgeons, and stricter supervision of trainees, are likely to address only a minority of technical errors. Surgical safety research should instead focus on improving decision-making and performance in routine operations for complex patients and circumstances.
7 CFR Exhibit B to Subpart I of... - Evaluation Report of Self-Help Technical Assistance (TA) Grants
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 13 2014-01-01 2013-01-01 true Evaluation Report of Self-Help Technical Assistance... Self-Help Technical Assistance Grants Pt. 1944, Subpt. I, Exh. B Exhibit B to Subpart I of Part 1944—Evaluation Report of Self-Help Technical Assistance (TA) Grants Evaluation for Quarter Ending:(1...
7 CFR Exhibit B to Subpart I of... - Evaluation Report of Self-Help Technical Assistance (TA) Grants
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 13 2012-01-01 2012-01-01 false Evaluation Report of Self-Help Technical Assistance... Self-Help Technical Assistance Grants Pt. 1944, Subpt. I, Exh. B Exhibit B to Subpart I of Part 1944—Evaluation Report of Self-Help Technical Assistance (TA) Grants Evaluation for Quarter Ending:(1...
7 CFR Exhibit B to Subpart I of... - Evaluation Report of Self-Help Technical Assistance (TA) Grants
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 13 2013-01-01 2013-01-01 false Evaluation Report of Self-Help Technical Assistance... Self-Help Technical Assistance Grants Pt. 1944, Subpt. I, Exh. B Exhibit B to Subpart I of Part 1944—Evaluation Report of Self-Help Technical Assistance (TA) Grants Evaluation for Quarter Ending:(1...
Annotated bibliography of structural equation modelling: technical work.
Austin, J T; Wolfle, L M
1991-05-01
Researchers must be familiar with a variety of source literature to facilitate the informed use of structural equation modelling. Knowledge can be acquired through the study of an expanding literature found in a diverse set of publishing forums. We propose that structural equation modelling publications can be roughly classified into two groups: (a) technical and (b) substantive applications. Technical materials focus on the procedures rather than substantive conclusions derived from applications. The focus of this article is the former category; included are foundational/major contributions, minor contributions, critical and evaluative reviews, integrations, simulations and computer applications, precursor and historical material, and pedagogical textbooks. After a brief introduction, we annotate 294 articles in the technical category dating back to Sewall Wright (1921).
Olson, Jonathan R; McCarthy, Kimberly J; Perkins, Daniel F; Borden, Lynne M
2018-04-01
The Children, Youth, and Families At-Risk (CYFAR) initiative provides funding and technical support for local community-based programs designed to promote positive outcomes among vulnerable populations. In 2013, CYFAR implemented significant changes in the way it provides technical assistance (TA) to grantees. These changes included introducing a new TA model in which trained coaches provide proactive support that is tailored to individual CYFAR projects. The purpose of this paper is to describe the evolution of this TA model and present preliminary findings from a formative evaluation. CYFAR Principal Investigators (PIs) were invited to respond to online surveys in 2015 and 2016. The surveys were designed to assess PI attitudes towards the nature and quality of support that they receive from their coaches. CYFAR PIs reported that their coaches have incorporated a range of coaching skills and techniques into their work. PIs have generally positive attitudes towards their coaches, and these attitudes have become more positive over time. Results suggest that CYFAR PIs have been generally supportive of the new TA system. Factors that may have facilitated support include a strong emphasis on team-building and the provision of specific resources that support program design, implementation, and evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.
Structural Engineering: Overview
NASA Technical Reports Server (NTRS)
Castro, Edgar
2011-01-01
This slide presentation presents the work of the Structural Engineering Division of the Engineering Directorate. The work includes: providing technical expertise and leadership for the development, evaluation, and operation of structural, mechanical, and thermal spaceflight systems.
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
7 CFR 4280.116 - Application and documentation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... project goals that includes the following: (i) Title. Provide a descriptive title of the project... sufficient detail to allow the Agency to score the project and evaluate its technical feasibility. (B) Either...
Leff, Daniel R; Aggarwal, Rajesh; Rana, Mariam; Nakhjavani, Batool; Purkayastha, Sanjay; Khullar, Vik; Darzi, Ara W
2008-03-01
Research evaluating fatigue-induced skills decline has focused on acute sleep deprivation rather than the effects of circadian desynchronization associated with multiple shifts. As a result, the number of consecutive night shifts that residents can safely be on duty without detrimental effects to their technical skills remains unknown. A prospective observational cohort study was conducted to assess the impact of 7 successive night shifts on the technical surgical performance of junior residents. The interventional strategy included training 21 residents from surgery and allied disciplines on a virtual reality surgical simulator, towards the achievement of preset benchmark scores, followed by 294 technical skills assessments conducted over 1764 manpower night shift hours. Primary outcomes comprised serial technical skills assessments on 2 tasks of a virtual reality surgical simulator. Secondary outcomes included assessments of introspective fatigue, duration of sleep, and prospective recordings of activity (number of "calls" received, steps walked, and patients evaluated). Maximal deterioration in performance was observed following the first night shift. Residents took significantly longer to complete the first (P = 0.002) and second tasks (P = 0.005) compared with baseline. They also committed significantly greater numbers of errors (P = 0.025) on the first task assessed. Improved performance was observed across subsequent shifts towards baseline levels. Newly acquired technical surgical skills deteriorate maximally after the first night shift, emphasizing the importance of adequate preparation for night rotas. Performance improvements across successive shifts may be due to ongoing learning or adaptation to chronic fatigue. Further research should focus on assessments of both technical procedural skills and cognitive abilities to determine the rotas that best minimize errors and maximize patient safety.
ERIC Educational Resources Information Center
Schultz, Dana; Jaycox, Lisa H.; Hickman, Laura J.; Chandra, Anita; Barnes-Proby, Dionne; Acosta, Joie; Beckman, Alice; Francois, Taria; Honess-Morreale, Lauren
2010-01-01
Children's exposure to violence (CEV)--including direct child maltreatment, witnessing domestic violence, and witnessing community and school violence--can have serious consequences, including a variety of psychiatric disorders and behavioral problems, such as posttraumatic stress disorder, depression, and anxiety. Fortunately, research has shown…
Technical Performance as a Predictor of Clinical Outcomes in Laparoscopic Gastric Cancer Surgery.
Fecso, Andras B; Bhatti, Junaid A; Stotland, Peter K; Quereshy, Fayez A; Grantcharov, Teodor P
2018-03-23
The purpose of this study was to evaluate the relationship between technical performance and patient outcomes in laparoscopic gastric cancer surgery. Laparoscopic gastrectomy for cancer is an advanced procedure with high rate of postoperative morbidity and mortality. Many variables including patient, disease, and perioperative management factors have been shown to impact postoperative outcomes; however, the role of surgical performance is insufficiently investigated. A retrospective review was performed for all patients who had undergone laparoscopic gastrectomy for cancer at 3 teaching institutions between 2009 and 2015. Patients with available, unedited video-recording of their procedure were included in the study. Video files were rated for technical performance, using Objective Structured Assessments of Technical Skills (OSATS) and Generic Error Rating Tool instruments. The main outcome variable was major short-term complications. The effect of technical performance on patient outcomes was assessed using logistic regression analysis with backward selection strategy. Sixty-one patients with available video recordings were included in the study. The overall complication rate was 29.5%. The mean Charlson comorbidity index, type of procedure, and the global OSATS score were included in the final predictive model. Lower performance score (OSATS ≤29) remained an independent predictor for major short-term outcomes (odds ratio 6.49), while adjusting for comorbidities and type of procedure. Intraoperative technical performance predicts major short-term outcomes in laparoscopic gastrectomy for cancer. Ongoing assessment and enhancement of surgical skills using modern, evidence-based strategies might improve short-term patient outcomes. Future work should focus on developing and studying the effectiveness of such interventions in laparoscopic gastric cancer surgery.
[The development and evaluation of software to verify diagnostic accuracy].
Jensen, Rodrigo; de Moraes Lopes, Maria Helena Baena; Silveira, Paulo Sérgio Panse; Ortega, Neli Regina Siqueira
2012-02-01
This article describes the development and evaluation of software that verifies the accuracy of diagnoses made by nursing students. The software was based on a model that uses fuzzy logic concepts, including PERL, the MySQL database for Internet accessibility, and the NANDA-I 2007-2008 classification system. The software was evaluated in terms of its technical quality and usability through specific instruments. The activity proposed in the software involves four stages in which students establish the relationship values between nursing diagnoses, defining characteristics/risk factors and clinical cases. The relationship values determined by students are compared to those of specialists, generating performance scores for the students. In the evaluation, the software demonstrated satisfactory outcomes regarding the technical quality and, according to the students, helped in their learning and may become an educational tool to teach the process of nursing diagnosis.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-12
... of performing the technical analysis, management assessment, and program evaluation tasks required to.... Analysis of elements of the review process (including the presubmission process, and investigational device... time to facilitate a more efficient process. This includes analysis of root causes for inefficiencies...
Aeronautical Engineering: A continuing bibliography with indexes (supplement 188)
NASA Technical Reports Server (NTRS)
1985-01-01
This bibliography lists 477 reports, articles and other documents introduced into the NASA scientific and technical information system in May 1985. The coverage includes documents on the engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment and systems.
Assessing Quality in Higher Education: New Criteria for Evaluating Students' Satisfaction
ERIC Educational Resources Information Center
Zineldin, Mosad; Akdag, Hatice Camgoz; Vasicheva, Valentina
2011-01-01
The aim of this research is to present a new quality assurance model (5Qs) and to examine the major factors affecting students' perception of cumulative satisfaction. The model includes behavioural dimensions of student satisfaction. The factors included in this cumulative summation are technical, functional, infrastructure, interaction and…
ERIC Educational Resources Information Center
California Univ., Los Angeles. Center for the Study of Evaluation.
This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…
48 CFR 715.303-70 - Responsibilities of USAID evaluation committees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... evaluation committees. A technical evaluation committee shall be established for each proposed procurement. In each case, the committee shall be composed of a chair representing the cognizant technical office... representatives from other concerned offices as appropriate. (b) Technical evaluation procedures. (1) The...
Aeronautical Engineering: A continuing bibliography
NASA Technical Reports Server (NTRS)
1982-01-01
This bibliography lists 347 reports, articles and other documents introduced into the scientific and technical information system. Documents on the engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated compounds, equipment, and systems are included. Research and development in aerodynamics, aeronautics and ground support equipment for aeronautical vehicles are also included.
Lu, L N; He, X G; Zhu, J F; Xu, X; Zhang, R; Hu, X; Zou, H D
2016-11-11
Objective: To establish an assessment system, including indexes and scoring methods, that can be used for performance evaluation of the provincial blindness prevention technical guidance group properly and effectively . Methods: The indexes and scoring methods were set based on the core content of The " National Plan of Prevention and Treatment of Blindness (2012-2015)" , the specific requirement and target of the World Health Organization (WHO) "For the General Eye Health: Global plan of Action (2014-2019)" , and the current situation of the China's provinces and autonomous regions. These indexes should be of effectiveness, feasibility, comparability, guidance and advancing. Formed by a literature review of candidate indicators, the framework of the system is built by qualitative assessment. With the Delphi method, the system was further revised and improved. Empirical pilot study was then used to prove the feasibility, followed by the final qualitative analysis that establish the " Chinese provincial Blindness prevention technical guidance group performance evaluation system" . Results: Through the literature review and qualitative assessment, a six dimensional system framework was built, including 6 first-level indicators, 16 second-level indicators, and 29 third-level indicators through Delphi method evaluation. With the variation coefficient method, the coeffiences of the first-level index weight were calculated as: Organization and management 0.15, Development and implementation of blindness prevention plans 0.15, Implementation of blindness prevention projects 0.14, Training 0.17, Health education 0.18, and Cooperation and exchanges 0.21. The specific scoring method for this system is confirmed as: data and files check, field interview, and record interview, sampling investigation. Empirical pilot study was conducted in the Jilin, Guizhou and Gansu provinces, and the self-assessment results from local experts were consistent with the scores from the systems. Conclusion: This system established is appropriate at current time, and it can effectively evaluate the performance of the Chinese provincial Blindness prevention technical guidance group. (Chin J Ophthalmol, 2016, 52:814-824) .
Wind Energy Conversion System Analysis Model (WECSAM) computer program documentation
NASA Astrophysics Data System (ADS)
Downey, W. T.; Hendrick, P. L.
1982-07-01
Described is a computer-based wind energy conversion system analysis model (WECSAM) developed to predict the technical and economic performance of wind energy conversion systems (WECS). The model is written in CDC FORTRAN V. The version described accesses a data base containing wind resource data, application loads, WECS performance characteristics, utility rates, state taxes, and state subsidies for a six state region (Minnesota, Michigan, Wisconsin, Illinois, Ohio, and Indiana). The model is designed for analysis at the county level. The computer model includes a technical performance module and an economic evaluation module. The modules can be run separately or together. The model can be run for any single user-selected county within the region or looped automatically through all counties within the region. In addition, the model has a restart capability that allows the user to modify any data-base value written to a scratch file prior to the technical or economic evaluation.
2017-12-01
13 Table 2. TFDW File Descriptions ... evaluation FO Forward Observer FY Fiscal year GT General technical HLZ Helicopter landing zone ID Identification ITB Infantry Training...survive during AMCs most difficult training phases, to include FDC and advanced FDC evaluations . These events require a heightened degree of cognitive
ERIC Educational Resources Information Center
Buchholz, James L.
This document summarizes the selection, configuration, implementation, and evaluation of BiblioFile, a CD-ROM based bibliographic retrieval system used to catalog and process library materials for 103 school centers in the Palm Beach County Schools (Florida). Technical processing included the production of spine labels, check-out cards and…
Who Am I? Self-Exploration Series 1. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Miller, Sandra; And Others
This courseware evaluation rates the Who Am I? program developed by Instructional Enterprises. (This program--not contained in this document--is an interactive guidance course including four inventories students use to learn more about themselves.) Part A describes the program in terms of subject area (personal development) and hardware…
NASA Technical Reports Server (NTRS)
2009-01-01
This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.
FloorPlan. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Rosenfeld, Vila M.; And Others
This courseware evaluation rates the "FloorPlan" program developed by the Learning Seed. (The program--not included in this document--allows room design and arrangement to be performed on the computer screen.) The courseware was rated by a team of home economists participating in a network for the dissemination of courseware reviews.…
Grab a Byte. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Rosenfeld, Vila M.; And Others
This courseware evaluation rates the "Grab a Byte" program developed by tne National Dairy Council. (The program--not included in this document--is divided into three sections: Grab-a-Grape uses a quiz-show format to examine students' knowledge of food groups; Nutrition Sleuth reinforces students' nutrient knowledge; and Have-a-Byte…
ERIC Educational Resources Information Center
Björkholm, Eva
2014-01-01
Within the field of technology education, evaluating technical solutions is considered as an important topic. Research indicates that pupils have difficulties in evaluating technical solutions in terms of fitness for purpose, i.e. how effective a technical solution supports its intended function. By using the learning study, which is an iterative…
MODIS Validation, Data Merger and Other Activities Accomplished by the SIMBIOS Project: 2002-2003
NASA Technical Reports Server (NTRS)
Fargion, Giulietta S.; McClain, Charles R.
2003-01-01
The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, satellite data processing, and data product validation. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report focuses on the SIMBIOS Project s efforts in support of the Moderate-Resolution Imaging Spectroradiometer (MODIS) on the Earth Observing System (EOS) Terra platform (similar evaluations of MODIS/Aqua are underway). This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.
48 CFR 2415.305 - Proposal evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... technical portion of each proposal to the TEP Chairperson or his or her designee. The cost/price portion of each proposal shall be retained by the Contracting Officer pending initial technical evaluation by the TEP. (3) Technical evaluation. The TEP shall rate each proposal based on the evaluation factors...
Optimization of Automobile Crush Characteristics: Technical Report
DOT National Transportation Integrated Search
1975-10-01
A methodology is developed for the evaluation and optimization of societal costs of two-vehicle automobile collisions. Costs considered in a Figure of Merit include costs of injury/mortality, occupant compartment penetration, collision damage repairs...
Urban Rail Supporting Technology Program Fiscal Year 1975 - Year End Summary
DOT National Transportation Integrated Search
1975-12-01
The Urban Rail Supporting Technology Program is described for the 1975 fiscal year period. Important areas include program management, technical support and applications engineering, facilities development, test and evaluation, and technology develop...
Smith, Teresa M.; Estabrooks, Paul A.; Rasmussen, Cristy Geno; Blaser, Casey; Yaroch, Amy L
2018-01-01
Purpose and Objectives The National Early Care and Education Learning Collaboratives Project (ECELC) aims to improve best practices in early care and education (ECE) programs in topic areas of the Nutrition and Physical Activity Self-Assessment in Child Care (NAP SACC). Technical assistance is a component of the ECELC, yet its effect on outcomes is unclear. Beyond dose and duration of technical assistance, limited research exists on characteristics of technical assistance that contribute to outcomes. The objective of this study was to identify and describe technical assistance characteristics and explore associations with NAP SACC outcomes. Intervention Approach We collected data from 10 collaboratives comprising 84 ECE programs in 2 states in 2015–2016. The objective of technical assistance was to support programs in improving best practices. Technical assistance was provided to programs via on-site, telephone, or email and was tailored to program needs. Evaluation Methods We used a mixed-methods design to examine associations between technical assistance and NAP SACC outcomes. We used multiple regression analysis to assess quantitative data and qualitative comparative analysis to determine necessary and sufficient technical assistance conditions supporting NAP SACC outcomes. We also conducted a document review to describe technical assistance that referred conditions identified by the qualitative comparative analysis. Results Regression analyses detected an inverse relationship between changes in NAP SACC scores and hours of technical assistance. No clear pattern emerged in the qualitative comparative analysis, leaving no necessary and sufficient conditions. However, the qualitative comparative analysis identified feedback as a potentially important component of technical assistance, whereas resource sharing and frequent email were characteristics that seemed to reduce the likelihood of improved outcomes. Email and resource sharing were considered primarily general information rather than tailored technical assistance. Implications for Public Health Technical assistance may be used in programs and made adaptable to program needs. The inclusion and evaluation of technical assistance, especially tailored approaches, is warranted for environmental interventions, including ECE settings. PMID:29704371
Matharoo, Manmeet; Haycock, Adam; Sevdalis, Nick; Thomas-Gibson, Siwan
2014-12-14
To investigate whether novel, non-technical skills training for Bowel Cancer Screening (BCS) endoscopy teams enhanced patient safety knowledge and attitudes. A novel endoscopy team training intervention for BCS teams was developed and evaluated as a pre-post intervention study. Four multi-disciplinary BCS teams constituting BCS endoscopist(s), specialist screening practitioners, endoscopy nurses and administrative staff (A) from English BCS training centres participated. No patients were involved in this study. Expert multidisciplinary faculty delivered a single day's training utilising real clinical examples. Pre and post-course evaluation comprised participants' patient safety awareness, attitudes, and knowledge. Global course evaluations were also collected. Twenty-three participants attended and their patient safety knowledge improved significantly from 43%-55% (P ≤ 0.001) following the training intervention. 12/41 (29%) of the safety attitudes items significantly improved in the areas of perceived patient safety knowledge and awareness. The remaining safety attitude items: perceived influence on patient safety, attitudes towards error management, error management actions and personal views following an error were unchanged following training. Both qualitative and quantitative global course evaluations were positive: 21/23 (91%) participants strongly agreed/agreed that they were satisfied with the course. Qualitative evaluation included mandating such training for endoscopy teams outside BCS and incorporating team training within wider endoscopy training. Limitations of the study include no measure of increased patient safety in clinical practice following training. A novel comprehensive training package addressing patient safety, non-technical skills and adverse event analysis was successful in improving multi-disciplinary teams' knowledge and safety attitudes.
Matharoo, Manmeet; Haycock, Adam; Sevdalis, Nick; Thomas-Gibson, Siwan
2014-01-01
AIM: To investigate whether novel, non-technical skills training for Bowel Cancer Screening (BCS) endoscopy teams enhanced patient safety knowledge and attitudes. METHODS: A novel endoscopy team training intervention for BCS teams was developed and evaluated as a pre-post intervention study. Four multi-disciplinary BCS teams constituting BCS endoscopist(s), specialist screening practitioners, endoscopy nurses and administrative staff (A) from English BCS training centres participated. No patients were involved in this study. Expert multidisciplinary faculty delivered a single day’s training utilising real clinical examples. Pre and post-course evaluation comprised participants’ patient safety awareness, attitudes, and knowledge. Global course evaluations were also collected. RESULTS: Twenty-three participants attended and their patient safety knowledge improved significantly from 43%-55% (P ≤ 0.001) following the training intervention. 12/41 (29%) of the safety attitudes items significantly improved in the areas of perceived patient safety knowledge and awareness. The remaining safety attitude items: perceived influence on patient safety, attitudes towards error management, error management actions and personal views following an error were unchanged following training. Both qualitative and quantitative global course evaluations were positive: 21/23 (91%) participants strongly agreed/agreed that they were satisfied with the course. Qualitative evaluation included mandating such training for endoscopy teams outside BCS and incorporating team training within wider endoscopy training. Limitations of the study include no measure of increased patient safety in clinical practice following training. CONCLUSION: A novel comprehensive training package addressing patient safety, non-technical skills and adverse event analysis was successful in improving multi-disciplinary teams’ knowledge and safety attitudes. PMID:25516665
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
... Directorate; Technical Assistance Request and Evaluation AGENCY: National Protection and Programs Directorate... assistance requests from each State and territory. OEC will use the Technical Assistance Evaluation Form to... electronically. Evaluation forms may be submitted electronically or in paper form. The Office of Management and...
Polkowski, M; Larghi, A; Weynand, B; Boustière, C; Giovannini, M; Pujol, B; Dumonceau, J-M
2012-02-01
This article is the second of a two-part publication that expresses the current view of the European Society of Gastrointestinal Endoscopy (ESGE) about endoscopic ultrasound (EUS)-guided sampling, including EUS-guided fine needle aspiration (EUS-FNA) and EUS-guided Trucut biopsy. The first part (the Clinical Guideline) focused on the results obtained with EUS-guided sampling, and the role of this technique in patient management, and made recommendations on circumstances that warrant its use. The current Technical Guideline discusses issues related to learning, techniques, and complications of EUS-guided sampling, and to processing of specimens. Technical issues related to maximizing the diagnostic yield (e.g., rapid on-site cytopathological evaluation, needle diameter, microcore isolation for histopathological examination, and adequate number of needle passes) are discussed and recommendations are made for various settings, including solid and cystic pancreatic lesions, submucosal tumors, and lymph nodes. The target readership for the Clinical Guideline mostly includes gastroenterologists, oncologists, internists, and surgeons while the Technical Guideline should be most useful to endoscopists who perform EUS-guided sampling. A two-page executive summary of evidence statements and recommendations is provided. © Georg Thieme Verlag KG Stuttgart · New York.
Catheter Ablation of Focal Atrial Tachycardia Using Remote Magnetic Navigation.
Webster, Mark; Pasupati, Sanjeevan; Lever, Nigel; Stiles, Martin
2018-05-01
This first-in-human study evaluated the safety and technical feasibility of the Tempo temporary cardiac pacing lead (BioTrace Medical), which includes a novel fixation mechanism and soft tip. Complications of temporary pacing leads include dislodgment, arrhythmias, and ventricular perforation. Temporary pacing applications have increased with transcatheter aortic valve replacement (TAVR) growth, for rapid pacing during balloon valvuloplasty (BAV) and valve deployment, and for periprocedural bradyarrhythmia support. Eligible patients required temporary pacing for TAVR, BAV, or electrophysiology (EP) procedures. Transthoracic echocardiograms were obtained at baseline and 24 hours after lead removal. Safety was defined as freedom from pericardial effusion requiring intervention or evidence of tamponade. Technical feasibility involved successful intracardiac delivery and pace capture. Additional evaluations included pacing threshold (PCT), rapid pacing, dislodgment, or sustained ventricular arrhythmias. Follow-up was to 30 days. Twenty-five patients (60% female; mean age, 64 ± 19 years) underwent 13 TAVRs (7 Sapien 3 valves [Edwards Lifesciences], 4 CoreValves [Medtronic], and 2 Lotus valves [Boston Scientific]), 11 EP procedures, and 1 BAV at two New Zealand centers from January 2016 to June 2016. Safety was met in all patients, with no device-related adverse events. Technical feasibility was achieved in 23 cases (92%); 2 patients had unsuitable anatomy. No patient had lead dislodgment or sustained ventricular arrhythmias, and the final procedural PCT was 0.7 ± 0.5 mA. Rapid pacing was successful in all cases. Five patients had successful postprocedural use up to 5 days. This first-in-human study demonstrates the safety and technical feasibility of the Tempo lead, providing stable periprocedural temporary pacing support.
ERIC Educational Resources Information Center
Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine
2011-01-01
In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…
Crew Transportation Technical Standards and Design Evaluation Criteria
NASA Technical Reports Server (NTRS)
Lueders, Kathryn L.; Thomas, Rayelle E. (Compiler)
2015-01-01
Crew Transportation Technical Standards and Design Evaluation Criteria contains descriptions of technical, safety, and crew health medical processes and specifications, and the criteria which will be used to evaluate the acceptability of the Commercial Providers' proposed processes and specifications.
Lambert, Kelly; Mullan, Judy; Mansfield, Kylie; Owen, Paris
2017-11-01
Mobile phone applications (apps) are increasingly being used by patients with chronic kidney disease (CKD). We sought to describe the main purpose of commonly available renal diet apps and to quantify the accuracy of information, technical quality, and health literacy demand of renal diet apps. The design was content analysis. All eligible renal diet apps in the Australian Apple App Store, Google Play, Windows Phone, and Blackberry App World were evaluated. Eligible apps were in English and were related to kidney disease in humans (of any type or stage). Exclusion criteria included apps which were prohibited because of password protection. Renal diet information in the apps was compared with evidence-based guidelines for the management of kidney disease to quantify information accuracy. App information was evaluated using the Silberg Scale. Technical quality and health literacy demand were evaluated using the Mobile Application Rating Scale. A total of 21 apps were eligible for evaluation. The main purpose of these apps was to provide food and nutrition information (57.1%) or for educative purposes for CKD patients (38.1%). Only 47.6% (10/21) of apps contained accurate evidence-based information. Overall, app technical quality was considered acceptable (mean Mobile Application Rating Scale score 3.19 ± 0.35 out of 5), with 80.9% of apps scoring acceptable or greater for app technical quality. Scores for health literacy demand also indicated that most apps (15/21, 71.4%) were acceptable. A range of apps currently exist that may provide individuals with CKD with useful food and nutrition information or increase their knowledge of the renal diet. These apps are also mainly of acceptable technical quality and health literacy demand. However, caution is required when using renal diet apps because more than half of the apps evaluated were not accurate and evidence based. Copyright © 2017 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.
Yane, Kei; Maguchi, Hiroyuki; Katanuma, Akio; Takahashi, Kuniyuki; Osanai, Manabu; Kin, Toshifumi; Takaki, Ryo; Matsumoto, Kazuyuki; Gon, Katsushige; Matsumori, Tomoaki; Tomonari, Akiko; Nojima, Masanori
2015-03-01
Several studies have shown the useful-ness of endoscopic nasogallbladder drainage (ENGBD) in patients with acute cholecystitis. However, the procedure is difficult, and factors that affect technical success have not yet been clarified. We conducted a prospective study to eval-uate the technical feasibility, efficacy, and predictive factors for the technical success of ENGBD in patients with acute cholecystitis. All patients with moderate or severe acute cholecystitis who were enrolled underwent ENGBD between April 2009 and April 2011. Patients with surgically altered anatomy or pancreatobiliary malignancies were ex-cluded. The primary outcomes included technical success, clinical success, and complications. Factors that could affect the technical success were also examined. Of the 27 patients who underwent ENGBD during the study period, technical success was achieved in 21 (78%) and clinical improvement was achieved in 20 (95%). Early complications were encountered in four patients (15%). Gallbladder wall thickness (odds ratio [OR], 1.64; 95% confidence interval [CI], 1.08 to 2.47) and age (OR, 1.16; 95% CI, 1.00 to 1.35) were effective predictors of technical failure. ENGBD was effective in resolving acute cholecystitis; however, this modality was technically challenging and had a limited suc-cess rate. Because of technical difficulties, ENGBD should be reserved for limited indications. (Gut Liver, 2015;9239-246).
ERIC Educational Resources Information Center
Pedotti, Antonio, Ed.; Andrich, Renzo, Ed.
The monograph provides information on evaluation of technical aids, wheelchairs, and computerized information systems for disabled persons. The first chapter provides a general overview of actions of the European Community concerning technical aids evaluation, information on the "Concerted Action" program called "Evaluation of…
7 CFR 2003.22 - Functional organization of RUS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...
7 CFR 2003.22 - Functional organization of RUS.
Code of Federal Regulations, 2014 CFR
2014-01-01
... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...
7 CFR 2003.22 - Functional organization of RUS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...
7 CFR 2003.22 - Functional organization of RUS.
Code of Federal Regulations, 2013 CFR
2013-01-01
... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...
7 CFR 2003.22 - Functional organization of RUS.
Code of Federal Regulations, 2012 CFR
2012-01-01
... engineering practices and specifications. (ii) Power Supply Division. Headed by a division director, this... office develops engineering practices, policies, and technical data related to borrowers' telecommunications systems; and evaluates the application of new communications network technology, including...
Aeronautical engineering: A continuing bibliography with indexes (supplement 284)
NASA Technical Reports Server (NTRS)
1992-01-01
This bibliography lists 974 reports, articles, and other documents introduced into the NASA scientific and technical information system in Oct. 1992. The coverage includes documents on design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment, and systems. It also includes research and development in aerodynamics, aeronautics, and ground support equipment for aeronautical vehicles.
Large Area Crop Inventory Experiment (LACIE). Phase 2 evaluation report
NASA Technical Reports Server (NTRS)
1977-01-01
Documentation of the activities of the Large Area Crop Inventory Experiment during the 1976 Northern Hemisphere crop year is presented. A brief overview of the experiment is included as well as phase two area, yield, and production estimates for the United States Great Plains, Canada, and the Union of Soviet Socialist Republics spring winter wheat regions. The accuracies of these estimates are compared with independent government estimates. Accuracy assessment of the United States Great Plains yardstick region based on a through blind sight analysis is given, and reasons for variations in estimating performance are discussed. Other phase two technical activities including operations, exploratory analysis, reporting, methods of assessment, phase three and advanced system design, technical issues, and developmental activities are also included.
ERIC Educational Resources Information Center
McCombs, Barbara L.; And Others
The Computer Managed Instruction (CMI) Student Skills Project was developed and evaluated within the context of the Air Force Advanced Instructional System (AIS), with student study skill modules designed as short packages to be assigned near the beginning of any military technical training course; strategies or procedures included were expected…
ERIC Educational Resources Information Center
Oxford, Rebecca L.; And Others
The Washington state Title I Migrant Program Evaluation project is a feasibility study designed to assess the suitability of existing normed criterion referenced tests to measuring mathematics achievement at grades four, five, and six. Objectives include judging the technical qualities and content of several normed criterion referenced tests;…
Goldenberg, Mitchell G; Lee, Jason Y; Kwong, Jethro C C; Grantcharov, Teodor P; Costello, Anthony
2018-03-31
To systematically review and synthesise the validity evidence supporting intraoperative and simulation-based assessments of technical skill in urological robot-assisted surgery (RAS), and make evidence-based recommendations for the implementation of these assessments in urological training. A literature search of the Medline, PsycINFO and Embase databases was performed. Articles using technical skill and simulation-based assessments in RAS were abstracted. Only studies involving urology trainees or faculty were included in the final analysis. Multiple tools for the assessment of technical robotic skill have been published, with mixed sources of validity evidence to support their use. These evaluations have been used in both the ex vivo and in vivo settings. Performance evaluations range from global rating scales to psychometrics, and assessments are carried out through automation, expert analysts, and crowdsourcing. There have been rapid expansions in approaches to RAS technical skills assessment, both in simulated and clinical settings. Alternative approaches to assessment in RAS, such as crowdsourcing and psychometrics, remain under investigation. Evidence to support the use of these metrics in high-stakes decisions is likely insufficient at present. © 2018 The Authors BJU International © 2018 BJU International Published by John Wiley & Sons Ltd.
Future Spacelift Requirements Study
NASA Technical Reports Server (NTRS)
1997-01-01
This study addresses future space applications and the derived requirements these potential applications will have on future spacelift systems. This NASA sponsored activity is a comprehensive study of potential missions including those of the military, civil, and commercial users. The study objectively evaluated the key architectural requirements for future launch systems. The results of this study are technical, economic, and policy analyses of future spacelift systems. It is intended to assist NASA and DOD decision-makers in planning technical investments and establishing policy for future U.S. spacelift systems.
Jirativanont, T; Raksamani, K; Aroonpruksakul, N; Apidechakul, P; Suraseranivongse, S
2017-07-01
We sought to evaluate the validity of two non-technical skills evaluation instruments, the Anaesthetists' Non-Technical Skills (ANTS) behavioural marker system and the Ottawa Global Rating Scale (GRS), to apply them to anaesthesia training. The content validity, response process, internal structure, relations with other variables and consequences were described for validity evidence. Simulated crisis management sessions were initiated during which two trained raters evaluated the performance of postgraduate first-, second- and third-year (PGY-1, PGY-2 and PGY-3) anaesthesia residents. The study included 70 participants, composed of 24 PGY-1, 24 PGY-2 and 22 PGY-3 residents. Both instruments differentiated the non-technical skills of PGY-1 from PGY-3 residents ( P <0.05). Inter-rater agreement was measured using the intraclass correlation coefficient (ICC). For the ANTS instrument, the intraclass correlation coefficients for task management, team-working, situation awareness and decision-making were 0.79, 0.34, 0.81 and 0.70, respectively. For the Ottawa GRS, the intraclass correlation coefficients for overall performance, leadership, problem-solving, situation awareness, resource utilisation and communication skills were 0.86, 0.83, 0.84, 0.87, 0.80 and 0.86, respectively. The Cronbach's alpha for internal consistency of the ANTS instrument was 0.93, and was 0.96 for the Ottawa GRS. There was a high correlation between the ANTS and Ottawa GRS. The raters reported the ease of use of the Ottawa GRS compared to the ANTS. We found sufficient evidence of validity in the ANTS instrument and the Ottawa GRS for the evaluation of non-technical skills in a simulated anaesthesia setting, but the Ottawa GRS was more practical and had higher reliability.
TurboTech Technical Evaluation Automated System
NASA Technical Reports Server (NTRS)
Tiffany, Dorothy J.
2009-01-01
TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.
Dyer, Dianne; Cusden, Jane; Turner, Chris; Boyd, Jeff; Hall, Rob; Lautner, David; Hamilton, Douglas R; Shepherd, Lance; Dunham, Michael; Bigras, Andre; Bigras, Guy; McBeth, Paul; Kirkpatrick, Andrew W
2008-12-01
Ultrasound (US) has an ever increasing scope in the evaluation of trauma, but relies greatly on operator experience. NASA has refined telesongraphy (TS) protocols for traumatic injury, especially in reference to mentoring inexperienced users. We hypothesized that such TS might benefit remote terrestrial caregivers. We thus explored using real-time US and video communication between a remote (Banff) and central (Calgary) site during acute trauma resuscitations. A existing internet link, allowing bidirectional videoconferencing and unidirectional US transmission was used between the Banff and Calgary ERs. Protocols to direct or observe an extended focused assessment with sonography for trauma (EFAST) were adapted from NASA algorithms. A call rota was established. Technical feasibility was ascertained through review of completed checklists. Involved personnel were interviewed with a semistructured interview. In addition to three normal volunteers, 20 acute clinical examinations were completed. Technical challenges requiring solution included initiating US; audio and video communications; image freezing; and US transmission delays. FAST exams were completed in all cases and EFASTs in 14. The critical anatomic features of a diagnostic examination were identified in 98% of all FAST exams and a 100% of all EFASTs that were attempted. Enhancement of clinical care included confirmation of five cases of hemoperitoneum and two pneumothoraces (PTXs), as well as educational benefits. Remote personnel were appreciative of the remote direction particularly when instructions were given sequentially in simple, nontechnical language. The remote real-time guidance or observation of an EFAST using TS appears feasible. Most technical problems were quickly overcome. Further evaluation of this approach and technology is warranted in more remote settings with less experienced personnel.
ERIC Educational Resources Information Center
San Francisco State Coll., CA. Center for Technological Education.
The presentation, review and evaluation of innovative vocational-technical curriculums in operation was the major function of a San Francisco conference sponsored jointly by the Center for Technical Education at San Francisco State College and the Center for Studies in Vocational and Technical Education at the University of Wisconsin. Major…
Evaluation of Nipah Virus as a Human and Animal Biological Terrorism and Warfare Agent
2001-09-01
UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP013384 TITLE: Evaluation of Nipah Virus as a Human and Animal Biological...following component part numbers comprise the compilation report: ADP013371 thru ADP013468 UNCLASSIFIED 14. EVALUATION OF NIPAH VIRUS AS A HUMAN AND ANIMAL...of BTWC proposed including Nipah virus in the list of animal pathogens. This paper describes an evaluation of Nipah virus as a biological agent for
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... NUCLEAR REGULATORY COMMISSION [Project No. 753; NRC-2012-0019] Model Safety Evaluation for Plant... Regulatory Commission (NRC) is announcing the availability of the model safety evaluation (SE) for plant... the Improved Standard Technical Specification (ISTS), NUREG-1431, ``Standard Technical Specifications...
76 FR 9607 - Notice of Proposed Information Collection for Technical Evaluation Surveys
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-18
... Information Collection for Technical Evaluation Surveys AGENCY: Office of Surface Mining Reclamation and... information collection request for its Technical Evaluation customer surveys has been forwarded to the Office of Management and Budget (OMB) for review and comment. The information collection request describes...
Hybrid Propulsion Technology Program, phase 1. Volume 2: Technical discussion
NASA Technical Reports Server (NTRS)
1989-01-01
Information on hybrid propulsion system concepts is given largely in the form of outlines, charts and graphs. Included are the concept definition, trade study data generation, concept evaluation and selection, conceptual design definition, and technology definition.
Workforce Readiness: Competencies and Assessment.
ERIC Educational Resources Information Center
O'Neil, Harold F., Jr., Ed.
This book, which is intended for professionals in the assessment/evaluation/measurement, vocational and technical education, and educational psychology communities, contains 16 papers examining specifications of work force competencies and assessment of competencies. The following papers are included: "Review of Workforce Readiness…
An Input Evaluation of Three Technical Assistance Needs Assessment Strategies.
ERIC Educational Resources Information Center
Suarez, Tanya M.; Cox, James O.
The Technical Assistance Development System--TADS (a project to provide technical assistance to personnel implementing programs for preschool handicapped children and their families) conducted an evaluation of three technical assistance needs assessment strategies during 1979-80. The three strategies were: (1) on-site--conducted by a trained needs…
Conceptual design study of a V/STOL lift fan commercial short haul transport
NASA Technical Reports Server (NTRS)
Knight, R. G.; Powell, W. V., Jr.; Prizlow, J. A.
1973-01-01
Conceptual designs of V/STOL lift fan commercial short haul transport aircraft for the 1980-85 time period were studied to determine their technical and economic feasibility. The engine concepts included both integral and remote fans. The scope of the study included definition of the hover control concept for each propulsion system, aircraft design, mass properties, cruise performance, noise and ride qualities evaluation. Economic evaluation was also studied on the basis of direct-operating costs and route structure.
Conceptual design of a V/STOL lift fan commercial short haul transport
NASA Technical Reports Server (NTRS)
1973-01-01
Conceptual designs of V/STOL lift-fan commercial short-haul transport aircraft for the 1980-85 time period were studied to determine their technical and economic feasibility. Engine concepts studied included both integral remote fans. The scope of the study included definition of the hover control concept for each propulsion system, aircraft design, aircraft mass properties, cruise performance noise, and ride qualities evaluation. Economic evaluation was also studied on a basis of direct operating cost and route structure.
NASA Astrophysics Data System (ADS)
Wiedensohler, A.; Birmili, W.; Nowak, A.; Sonntag, A.; Weinhold, K.; Merkel, M.; Wehner, B.; Tuch, T.; Pfeifer, S.; Fiebig, M.; Fjäraa, A. M.; Asmi, E.; Sellegri, K.; Depuy, R.; Venzac, H.; Villani, P.; Laj, P.; Aalto, P.; Ogren, J. A.; Swietlicki, E.; Roldin, P.; Williams, P.; Quincey, P.; Hüglin, C.; Fierz-Schmidhauser, R.; Gysel, M.; Weingartner, E.; Riccobono, F.; Santos, S.; Grüning, C.; Faloon, K.; Beddows, D.; Harrison, R. M.; Monahan, C.; Jennings, S. G.; O'Dowd, C. D.; Marinoni, A.; Horn, H.-G.; Keck, L.; Jiang, J.; Scheckman, J.; McMurry, P. H.; Deng, Z.; Zhao, C. S.; Moerman, M.; Henzing, B.; de Leeuw, G.
2010-12-01
Particle mobility size spectrometers often referred to as DMPS (Differential Mobility Particle Sizers) or SMPS (Scanning Mobility Particle Sizers) have found a wide application in atmospheric aerosol research. However, comparability of measurements conducted world-wide is hampered by lack of generally accepted technical standards with respect to the instrumental set-up, measurement mode, data evaluation as well as quality control. This article results from several instrument intercomparison workshops conducted within the European infrastructure project EUSAAR (European Supersites for Atmospheric Aerosol Research). Under controlled laboratory conditions, the number size distribution from 20 to 200 nm determined by mobility size spectrometers of different design are within an uncertainty range of ±10% after correcting internal particle losses, while below and above this size range the discrepancies increased. Instruments with identical design agreed within ±3% in the peak number concentration when all settings were done carefully. Technical standards were developed for a minimum requirement of mobility size spectrometry for atmospheric aerosol measurements. Technical recommendations are given for atmospheric measurements including continuous monitoring of flow rates, temperature, pressure, and relative humidity for the sheath and sample air in the differential mobility analyser. In cooperation with EMEP (European Monitoring and Evaluation Program), a new uniform data structure was introduced for saving and disseminating the data within EMEP. This structure contains three levels: raw data, processed data, and final particle size distributions. Importantly, we recommend reporting raw measurements including all relevant instrument parameters as well as a complete documentation on all data transformation and correction steps. These technical and data structure standards aim to enhance the quality of long-term size distribution measurements, their comparability between different networks and sites, and their transparency and traceability back to raw data.
A method for building evaluation competency among community-based organizations.
Kelly, Cheryl M; LaRose, Jessi; Scharff, Darcell P
2014-05-01
Community-based organizations often lack the capacity (e.g., time, staff, skills) to effectively evaluate programs, policies, and environmental changes. Providing evaluation technical assistance and training can be an effective and feasible way to build individual evaluation competency. The purpose of this article is to present a practical approach and related tools that can be used by evaluators and others (e.g., academic partners, funders) providing assistance to build evaluation skills in community organizations. The approach described was developed in collaboration with local universities and a regional health foundation to provide intensive technical support to 19 community-based organizations awarded funding to implement obesity prevention projects. Technical assistance processes and tools were designed to be tailored to organizations' capacity and needs and can be used as templates by others who provide technical assistance. Evaluators, funders, and academic partners can use lessons learned from this experience to help shape and implement evaluation technical assistance approaches with community-based organizations.
Aeronautical engineering: A continuing bibliography with indexes (supplement 282)
NASA Technical Reports Server (NTRS)
1992-01-01
This bibliography lists 623 reports, articles, and other documents introduced into the NASA scientific and technical information system in Aug. 1992. The coverage includes documents on the engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment, and systems. It also includes research and development in aerodynamics, aeronautics, and ground support equipment for aeronautical vehicles.
Aeronautical Engineering: A Continuing Bibliography with Indexes
NASA Technical Reports Server (NTRS)
1995-01-01
This bibliography lists 193 reports, journal articles, and other documents introduced in the NASA scientific and technical system in Aug. 1995. Subject coverage includes documents on the engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment, and systems. It also includes research and development in aerodynamics, aeronautics, and ground support equipment for aeronautical vehicles
Aeronautical engineering: A continuing bibliography with indexes (supplement 324)
NASA Technical Reports Server (NTRS)
1995-01-01
This bibliography lists 149 reports, articles, and other documents introduced into the NASA scientific and technical information system in December 1995. Subject coverage includes engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment, and systems. It also includes research and development in aerodynamics, aeronautics, and ground support equipment for aeronautical vehicles.
Aeronautical engineering: A continuing bibliography with indexes (supplement 313)
NASA Technical Reports Server (NTRS)
1995-01-01
This bibliography lists 179 reports, articles, and other documents introduced into the NASA scientific and technical information system in Jan. 1995. Subject coverage includes: engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment, and systems. It also includes research and development in aerodynamics, aeronautics, and ground support equipment for aeronautical vehicles.
Aeronautical engineering: A continuing bibliography with indexes (supplement 310)
NASA Technical Reports Server (NTRS)
1994-01-01
This bibliography lists 29 reports, articles, and other documents introduced into the NASA scientific and technical information system in Nov. 1994. Subject coverage includes: engineering and theoretical aspects of design, construction,evaluation testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment and systems. It also includes research and development in aerodynamics, aeronautics, and ground support equipment for aeronautical vehicles.
Hanford internal dosimetry program manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbaugh, E.H.; Sula, M.J.; Bihl, D.E.
1989-10-01
This document describes the Hanford Internal Dosimetry program. Program Services include administrating the bioassay monitoring program, evaluating and documenting assessments of internal exposure and dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating internal radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. 13 refs., 16 figs., 42 tabs.
A laboratory study was performed in 1994-1995 to identify and estimate the influence of key characteristics for evaluating the performance of portable X-ray fluorescence (XRF) spectrometers. Six new/modified spectrometers, including HNU SEFA-Pb, Metorex X-MET, Niton X-L, Radiat...
Aeronautical Engineering: A Continuing Bibliography with indexes
NASA Technical Reports Server (NTRS)
1984-01-01
This bibliography lists 426 reports, articles and other documents introduced into the NASA scientific and technical information system in August 1984. Reports are cited in the area of Aeronautical Engineering. The coverage includes documents on the engineering and theoretical aspects of design, construction, evaluation, testing operation and performance of aircraft (including aircraft engines) and associated components, equipment and systems.
1983-84 Evaluation Report of Vocational and Technical Education in South Carolina.
ERIC Educational Resources Information Center
South Carolina State Advisory Council on Vocational and Technical Education, Columbia.
This evaluation report contains a series of articles on vocational and technical education encompassing the 1983-84 school year. The articles, collectively, are intended to give an overall picture of vocational and technical education programs in South Carolina. The lead article on technical education strongly urges several changes to bring about…
Choi, Tae Won; Lee, Dong Ho; Lee, Jeong-Hoon; Yu, Su Jong; Kim, Yoon Jun; Yoon, Jung-Hwan; Han, Joon Koo
2017-01-01
Objective To prospectively evaluate the safety and therapeutic effectiveness of dual-switching monopolar (DSM) radiofrequency ablation (RFA) for the treatment of hepatocellular carcinoma (HCC), and to retrospectively compare the results with those of single-switching monopolar (SSM) RFA in a historical control group. Materials and Methods This study was approved by the Institutional Review Board, with informed consent obtained from all patients. Fifty-two HCC patients who underwent DSM-RFA using a separable clustered electrode and dual-generators were prospectively enrolled. Technical parameters, complications, technical success, technical effectiveness, and local tumor progression (LTP) rates were evaluated by means of post-procedural and follow-up imaging. Thereafter, the outcome of DSM-RFA was compared with those of 249 retrospectively included HCC patients treated with SSM-RFA. Results There were two major complications (3.8%, 2/52) including pleural and pericardial effusion in the DSM-RFA group. The DSM-RFA yielded a 100% technical success rate, a 98.1% technical effectiveness rate, and a 4.3% 2-year LTP rate. In a retrospective comparison between the two groups, DSM-RFA created significantly larger ablation volume (4.20 ± 2.07 cm3/min vs. 3.03 ± 1.99 cm3/min, p < 0.01), and delivered higher energy (1.43 ± 0.37 kcal/min vs. 1.25 ± 0.50 kcal/min, p < 0.01) per given time, than SSM-RFA. There was no significant difference in major procedure-related complications (3.8% vs. 4.4%) and technical effectiveness rate (98.1% vs. 96.4%) between the two groups (p = 1.00). In addition, the 2-year LTP rate of DSM-RFA and SSM-RFA were 4.3% and 10.1%, respectively (p = 0.15). Conclusion DSM-RFA using a separable clustered electrode is safe and provides high local tumor control and good preliminary clinical outcome for small HCCs, which are at least comparable to those of SSM-RFA. PMID:28860897
Management Styles and Techniques: People.
ERIC Educational Resources Information Center
DeLoach, Marva L.; And Others
1987-01-01
Three articles discuss management of library technical processes personnel. The first article focuses on the employer employee relationship and communication; the second explores management trends, including participative decision making, personnel evaluation, management by objectives, and the collegial system; and the third focuses on the…
Code of Federal Regulations, 2010 CFR
2010-01-01
... assessment, it will seek evidence relevant to the assessment, including an analysis of the military needs of a selected country or countries, technical analysis, and intelligence information from the.... (c) Analysis. BIS will conduct its analysis by evaluating whether the reasonable and reliable...
Evaluation of conventional power systems. [emphasizing fossil fuels and nuclear energy
NASA Technical Reports Server (NTRS)
Smith, K. R.; Weyant, J.; Holdren, J. P.
1975-01-01
The technical, economic, and environmental characteristics of (thermal, nonsolar) electric power plants are reviewed. The fuel cycle, from extraction of new fuel to final waste management, is included. Emphasis is placed on the fossil fuel and nuclear technologies.
Haegerich, Tamara M.; David-Ferdon, Corinne; Noonan, Rita K.; Manns, Brian J.; Billie, Holly C.
2016-01-01
Injury and violence prevention strategies have greater potential for impact when they are based on scientific evidence. Systematic reviews of the scientific evidence can contribute key information about which policies and programs might have the greatest impact when implemented. However, systematic reviews have limitations, such as lack of implementation guidance and contextual information, that can limit the application of knowledge. “Technical packages,” developed by knowledge brokers such as the federal government, nonprofit agencies, and academic institutions, have the potential to be an efficient mechanism for making information from systematic reviews actionable. Technical packages provide information about specific evidence-based prevention strategies, along with the estimated costs and impacts, and include accompanying implementation and evaluation guidance to facilitate adoption, implementation, and performance measurement. We describe how systematic reviews can inform the development of technical packages for practitioners, provide examples of technical packages in injury and violence prevention, and explain how enhancing review methods and reporting could facilitate the use and applicability of scientific evidence. PMID:27604301
A performance evaluation of the IBM 370/XT personal computer
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Triantafyllopoulos, Spiros
1984-01-01
An evaluation of the IBM 370/XT personal computer is given. This evaluation focuses primarily on the use of the 370/XT for scientific and technical applications and applications development. A measurement of the capabilities of the 370/XT was performed by means of test programs which are presented. Also included is a review of facilities provided by the operating system (VM/PC), along with comments on the IBM 370/XT hardware configuration.
Li, Yue; Spector, Williams D.; Glance, Laurent G.; Mukamel, Dana B.
2013-01-01
Context To improve nursing home quality, many states developed “Technical Assistance Programs” that provide on-site consultation and training for nursing facility staff. Methods We conducted a national survey on these state programs to collect data on program design, operations, financing, and perceived effectiveness. Results As of 2010, 17 states have developed such programs. Compared to existing state nursing home quality regulations, these programs represent a collaborative, rather than enforcement-oriented, approach to quality. However, existing programs vary substantially in key structural features such as staffing patterns, funding levels, and relationship with state survey and certification agencies. Perceived effectiveness by program officials on quality was high, although few states have performed formal evaluations. Perceived barriers to program effectiveness included lack of appropriate staff and funding, among others. Conclusion State “Technical Assistance Programs” for nursing homes varies in program design and perceived effectiveness. Future comparative evaluations are needed to inform evidence-based quality initiatives. PMID:23216345
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
Materia, Frank T; Miller, Elizabeth A; Runion, Megan C; Chesnut, Ryan P; Irvin, Jamie B; Richardson, Cameron B; Perkins, Daniel F
2016-06-01
Program evaluation has become increasingly important, and information on program performance often drives funding decisions. Technology use and integration can help ease the burdens associated with program evaluation by reducing the resources needed (e.g., time, money, staff) and increasing evaluation efficiency. This paper reviews how program evaluators, across disciplines, can apply internet and mobile technologies to key aspects of program evaluation, which consist of participant registration, participant tracking and retention, process evaluation (e.g., fidelity, assignment completion), and outcome evaluation (e.g., behavior change, knowledge gain). In addition, the paper focuses on the ease of use, relative cost, and fit with populations. An examination on how these tools can be integrated to enhance data collection and program evaluation is discussed. Important limitations of and considerations for technology integration, including the level of technical skill, cost needed to integrate various technologies, data management strategies, and ethical considerations, are highlighted. Lastly, a case study of technology use in an evaluation conducted by the Clearinghouse for Military Family Readiness at Penn State is presented and illustrates how technology integration can enhance program evaluation. Copyright © 2016 Elsevier Ltd. All rights reserved.
Electrification Futures Study: A Technical Evaluation of the Impacts of an
Technical Evaluation of the Impacts of an Electrified U.S. Energy System Electrification Futures Study: A Technical Evaluation of the Impacts of an Electrified U.S. Energy System Illustration showing various impacts of widespread electrification in the United States. In addition to NREL, the research team
[Discussion on Technical Evaluation for Medical Device Registration Material].
Chu, Yungao; Qian, Hong; Zhu, Yingfeng
2017-07-30
This article first introduces the main contents of the requirements for medical device registration. Secondly, this article chooses the vertebral forming surgery system as an example to discuss the technical evaluation for the registration research material. The article hopes to provide a reference for the applicant who prepare the registration material and the technical evaluator who make the evaluation for the medical device registration.
System Issues Related to Implementing on the Internet
NASA Technical Reports Server (NTRS)
Mackey, William; Bagg, Thomas C., III
1999-01-01
Implementing capabilities on the World Wide Web should never be taken lightly. A good systems engineer is able to examine such implementations from all points of view, including political, legal, security, access, technical deployment, and quality. The evacuation discussed in this paper was conducted to ensure that the National Aeronautics and Space Administration (NASA) was proceeding in a correct direction by implementing RECALL a Lessons Learned System on the Web and, subsequently, did so successfully. The systems approach extended well beyond technical implementation to several issue that are not often addressed by an implementation team. The resulting evaluation increased the team's sensitivity to such issues and, in fact, the authors believe that the evaluation provided as much benefit as the system itself.
Technical Feasibility Aspects of the Geothermal Resource Reporting Methodology (GRRM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Badgett, Alex; Young, Katherine R; Dobson, Patrick F.
This paper reviews the technical assessment of the Geothermal Research Reporting Methodology (GRRM, http://en.openei.org/wiki/GRRM) being developed for reporting geothermal resources and project progress. The goal of the methodology is to provide the U.S. Department of Energy's Geothermal Technologies Office (GTO) with a consistent and comprehensible means of evaluating the impacts of its funding programs. The GRRM is designed to provide uniform assessment criteria for geothermal resource grades and developmental phases of geothermal resource exploration and development. This resource grade system provides information on twelve attributes of geothermal resource locations (e.g., temperature, permeability, land access) to indicate potential for geothermal development.more » The GTO plans to use these Protocols to help quantitatively identify the greatest barriers to geothermal development, develop measureable program goals that will have the greatest impact to geothermal deployment, objectively evaluate proposals based (in part) on a project's ability to contribute to program goals, monitor project progress, and report on GTO portfolio performance. The GRRM assesses three areas of geothermal potential: geological, socio-economic, and technical. Previous work and publications have discussed the work done on the geological aspects of this methodology (Young et al. 2015c); this paper details the development of the technical assessment of the GRRM. Technical development attributes considered include: reservoir management, drilling, logistics, and power conversion.« less
Framework for Assessing Biogenic CO2 Emissions from Stationary Sources
This revision of the 2011 report, Accounting Framework for Biogenic CO2 Emissions from Stationary Sources, evaluates biogenic CO2 emissions from stationary sources, including a detailed study of the scientific and technical issues associated with assessing biogenic carbon dioxide...
THE OHIO RIVER OIL SPILL: A CASE STUDY
The spill of diesel oil fuel from an Ashland Oil storage tank in January 1988 on the Monongahela River raised a number of technical, legislative, and administrative issues. These include as assessing long- and short-term environmental damage, evaluating regulations regarding oil ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woodford, D.
This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.
Energy conservation policy evaluation. Study module IA. Volume II. Technical appendix. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergstresser, K.; Berney, R.E.; Carter, L.F.
1978-01-01
This volume contains detailed technical analyses of the 19 energy conservation measures which were discussed as regional policy options in the report proper (PB-274 337). For each measure there is a description of how the measure works to reduce consumption; an assessment of potential savings, costs, and returns to adopters; probable 'normal' adoption rates under present policies; and potential adoption rates if some additional conservation policy options are implemented. Report includes chapters on environmental residuals from energy end uses, and policy preferences of households and energy marketers.
[Platforms are needed for innovative basic research in ophthalmology].
Wang, Yi-qiang
2012-07-01
Basic research poses the cornerstone of technical innovation in all lines including medical sciences. Currently, there are shortages of professional scientists as well as technical supporting teams and facilities in the field of basic research of ophthalmology and visual science in China. Evaluation system and personnel policies are not supportive for innovative but high-risk-of-failure research projects. Discussion of reasons and possible solutions are given here to address these problems, aiming at promoting buildup of platforms hosting novel and important basic research in eye science in this country.
Piromchai, Patorn; Avery, Alex; Laopaiboon, Malinee; Kennedy, Gregor; O'Leary, Stephen
2015-09-09
Virtual reality simulation uses computer-generated imagery to present a simulated training environment for learners. This review seeks to examine whether there is evidence to support the introduction of virtual reality surgical simulation into ear, nose and throat surgical training programmes. 1. To assess whether surgeons undertaking virtual reality simulation-based training achieve surgical ('patient') outcomes that are at least as good as, or better than, those achieved through conventional training methods.2. To assess whether there is evidence from either the operating theatre, or from controlled (simulation centre-based) environments, that virtual reality-based surgical training leads to surgical skills that are comparable to, or better than, those achieved through conventional training. The Cochrane Ear, Nose and Throat Disorders Group (CENTDG) Trials Search Co-ordinator searched the CENTDG Trials Register; Central Register of Controlled Trials (CENTRAL 2015, Issue 6); PubMed; EMBASE; ERIC; CINAHL; Web of Science; ClinicalTrials.gov; ICTRP and additional sources for published and unpublished trials. The date of the search was 27 July 2015. We included all randomised controlled trials and controlled trials comparing virtual reality training and any other method of training in ear, nose or throat surgery. We used the standard methodological procedures expected by The Cochrane Collaboration. We evaluated both technical and non-technical aspects of skill competency. We included nine studies involving 210 participants. Out of these, four studies (involving 61 residents) assessed technical skills in the operating theatre (primary outcomes). Five studies (comprising 149 residents and medical students) assessed technical skills in controlled environments (secondary outcomes). The majority of the trials were at high risk of bias. We assessed the GRADE quality of evidence for most outcomes across studies as 'low'. Operating theatre environment (primary outcomes) In the operating theatre, there were no studies that examined two of three primary outcomes: real world patient outcomes and acquisition of non-technical skills. The third primary outcome (technical skills in the operating theatre) was evaluated in two studies comparing virtual reality endoscopic sinus surgery training with conventional training. In one study, psychomotor skill (which relates to operative technique or the physical co-ordination associated with instrument handling) was assessed on a 10-point scale. A second study evaluated the procedural outcome of time-on-task. The virtual reality group performance was significantly better, with a better psychomotor score (mean difference (MD) 1.66, 95% CI 0.52 to 2.81; 10-point scale) and a shorter time taken to complete the operation (MD -5.50 minutes, 95% CI -9.97 to -1.03). Controlled training environments (secondary outcomes) In a controlled environment five studies evaluated the technical skills of surgical trainees (one study) and medical students (three studies). One study was excluded from the analysis. Surgical trainees: One study (80 participants) evaluated the technical performance of surgical trainees during temporal bone surgery, where the outcome was the quality of the final dissection. There was no difference in the end-product scores between virtual reality and cadaveric temporal bone training. Medical students: Two other studies (40 participants) evaluated technical skills achieved by medical students in the temporal bone laboratory. Learners' knowledge of the flow of the operative procedure (procedural score) was better after virtual reality than conventional training (SMD 1.11, 95% CI 0.44 to 1.79). There was also a significant difference in end-product score between the virtual reality and conventional training groups (SMD 2.60, 95% CI 1.71 to 3.49). One study (17 participants) revealed that medical students acquired anatomical knowledge (on a scale of 0 to 10) better during virtual reality than during conventional training (MD 4.3, 95% CI 2.05 to 6.55). No studies in a controlled training environment assessed non-technical skills. There is limited evidence to support the inclusion of virtual reality surgical simulation into surgical training programmes, on the basis that it can allow trainees to develop technical skills that are at least as good as those achieved through conventional training. Further investigations are required to determine whether virtual reality training is associated with better real world outcomes for patients and the development of non-technical skills. Virtual reality simulation may be considered as an additional learning tool for medical students.
A multinational report of technical factors on stereotactic body radiotherapy for oligometastases.
Redmond, Kristin J; Lo, Simon S; Dagan, Roi; Poon, Ian; Foote, Matthew C; Erler, Darby; Lee, Young; Lohr, Frank; Biswas, Tithi; Ricardi, Umberto; Sahgal, Arjun
2017-05-01
Oligometastatic cancer is being increasingly managed with aggressive local therapy using stereotactic body radiation therapy (SBRT). However, few guidelines exist. We summarize the results of an international survey reviewing technical factors for extracranial SBRT for oligometastatic disease to guide safe management. Seven high-volume centers contributed. Levels of agreement were categorized as strong (6-7 common responses), moderate (4-5), low (2-3) or no agreement. We present the results of a multi-national and multi-institutional survey of technical factors of SBRT for extracranial oligometastases. Key methods including target delineation, prescription doses, normal tissue constraints, imaging and set-up for safe implementation and practice of SBRT for oligometastasis have been identified. This manuscript will serve as a foundation for future clinical evaluations.
77 FR 37710 - Notice of Proposed Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... to continue the collection of information for two technical training program course effectiveness... approval. This collection is for OSM's Technical Training Program Course Effectiveness Evaluations (1029... collection activity: Title: Technical Training Program Course Effectiveness Evaluation. OMB Control Number...
Aeronautical engineering: A continuing bibliography with indexes (supplement 277)
NASA Technical Reports Server (NTRS)
1992-01-01
This bibliography lists 467 reports, articles, and other documents introduced into the NASA scientific and technical information system in Mar. 1992. Subject coverage includes: the engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines); and associated aircraft components, equipment, and systems. It also includes research and development in ground support systems, theoretical and applied aspects of aerodynamics, and general fluid dynamics.
A strategy for electronic dissemination of NASA Langley technical publications
NASA Technical Reports Server (NTRS)
Roper, Donna G.; Mccaskill, Mary K.; Holland, Scott D.; Walsh, Joanne L.; Nelson, Michael L.; Adkins, Susan L.; Ambur, Manjula Y.; Campbell, Bryan A.
1994-01-01
To demonstrate NASA Langley Research Center's relevance and to transfer technology to external customers in a timely and efficient manner, Langley has formed a working group to study and recommend a course of action for the electronic dissemination of technical reports (EDTR). The working group identified electronic report requirements (e.g., accessibility, file format, search requirements) of customers in U.S. industry through numerous site visits and personal contacts. Internal surveys were also used to determine commonalities in document preparation methods. From these surveys, a set of requirements for an electronic dissemination system was developed. Two candidate systems were identified and evaluated against the set of requirements: the Full-Text Electronic Documents System (FEDS), which is a full-text retrieval system based on the commercial document management package Interleaf, and the Langley Technical Report Server (LTRS), which is a Langley-developed system based on the publicly available World Wide Web (WWW) software system. Factors that led to the selection of LTRS as the vehicle for electronic dissemination included searching and viewing capability, current system operability, and client software availability for multiple platforms at no cost to industry. This report includes the survey results, evaluations, a description of the LTRS architecture, recommended policy statement, and suggestions for future implementations.
Mammographic density estimation with automated volumetric breast density measurement.
Ko, Su Yeon; Kim, Eun-Kyung; Kim, Min Jung; Moon, Hee Jung
2014-01-01
To compare automated volumetric breast density measurement (VBDM) with radiologists' evaluations based on the Breast Imaging Reporting and Data System (BI-RADS), and to identify the factors associated with technical failure of VBDM. In this study, 1129 women aged 19-82 years who underwent mammography from December 2011 to January 2012 were included. Breast density evaluations by radiologists based on BI-RADS and by VBDM (Volpara Version 1.5.1) were compared. The agreement in interpreting breast density between radiologists and VBDM was determined based on four density grades (D1, D2, D3, and D4) and a binary classification of fatty (D1-2) vs. dense (D3-4) breast using kappa statistics. The association between technical failure of VBDM and patient age, total breast volume, fibroglandular tissue volume, history of partial mastectomy, the frequency of mass > 3 cm, and breast density was analyzed. The agreement between breast density evaluations by radiologists and VBDM was fair (k value = 0.26) when the four density grades (D1/D2/D3/D4) were used and moderate (k value = 0.47) for the binary classification (D1-2/D3-4). Twenty-seven women (2.4%) showed failure of VBDM. Small total breast volume, history of partial mastectomy, and high breast density were significantly associated with technical failure of VBDM (p = 0.001 to 0.015). There is fair or moderate agreement in breast density evaluation between radiologists and VBDM. Technical failure of VBDM may be related to small total breast volume, a history of partial mastectomy, and high breast density.
Space Flight Resource Management Training for International Space Station Flight Controllers
NASA Technical Reports Server (NTRS)
O'Keefe, William S.
2011-01-01
Training includes both SFRM-dedicated lessons and SFRM training embedded into technical lessons. Goal is to reduce certification times by 50% and integrated simulations by 75-90%. SFRM is practiced, evaluated and debriefed in part task trainers and full-task simulation lessons. SFRM model and training are constantly being evaluated against student/management feedback, best practices from industry/ military, and latest research.
Moreira, Alexandre; Saldanha Aoki, Marcelo; Carling, Chris; Alan Rodrigues Lopes, Rafael; Felipe Schultz de Arruda, Ademir; Lima, Marcelo; Cesar Correa, Umberto; Bradley, Paul S
2016-01-01
Background There have been claims that small-sided games (SSG) may generate an appropriate environment to develop youth players’ technical performance associated to game-related problem solving. However, the temporal change in technical performance parameters of youth players during SSG is still unknown. Objectives The aim of this study was to examine temporal changes in technical and physical performances during a small-sided game (SSG) in elite soccer players. Methods Sixty elite youth players (age 14.8 ± 0.2 yr; stature 177 ± 5 cm; body mass 66.2 ± 4.7 kg) completed a 5 v 5 SSG using two repetitions of 8 minutes interspersed by 3 minutes of passive recovery. To evaluate temporal changes in performance, the data were analysed across 4 minutes quarters. Physical performance parameters included the total distance covered (TDC), the frequency of sprints (>18 km•h-1), accelerations and decelerations (> 2.0 m•s-2 and - 2.0 m•s-2), metabolic power (W•kg-1), training impulse (TRIMP), TDC: TRIMP, number of impacts, and body load. Technical performance parameters included goal attempts, total number of tackles, tackles and interceptions, total number of passes, and passes effectiveness. Results All physical performance parameters decreased from the first to the last quarter with notable declines in TDC, metabolic power and the frequency of sprints, accelerations and decelerations (P < 0.05; moderate to very large ES: 1.08 - 3.30). However, technical performance parameters did not vary across quarters (P > 0.05; trivial ES for 1st v 4th quarters: 0.15 - 0.33). Conclusions The data demonstrate that technical performance is maintained despite substantial declines in physical performance during a SSG in elite youth players. This finding may have implications for designing SSG’s for elite youth players to ensure physical, technical and tactical capabilities are optimized. Modifications in player number, pitch dimensions, rules, coach encouragement, for instance, should be included taking into account the main aim of a given session and then focused on overloading physical or technical elements. PMID:28144411
Moreira, Alexandre; Saldanha Aoki, Marcelo; Carling, Chris; Alan Rodrigues Lopes, Rafael; Felipe Schultz de Arruda, Ademir; Lima, Marcelo; Cesar Correa, Umberto; Bradley, Paul S
2016-12-01
There have been claims that small-sided games (SSG) may generate an appropriate environment to develop youth players' technical performance associated to game-related problem solving. However, the temporal change in technical performance parameters of youth players during SSG is still unknown. The aim of this study was to examine temporal changes in technical and physical performances during a small-sided game (SSG) in elite soccer players. Sixty elite youth players (age 14.8 ± 0.2 yr; stature 177 ± 5 cm; body mass 66.2 ± 4.7 kg) completed a 5 v 5 SSG using two repetitions of 8 minutes interspersed by 3 minutes of passive recovery. To evaluate temporal changes in performance, the data were analysed across 4 minutes quarters. Physical performance parameters included the total distance covered (TDC), the frequency of sprints (>18 km•h -1 ), accelerations and decelerations (> 2.0 m•s -2 and - 2.0 m•s -2 ), metabolic power (W•kg -1 ), training impulse (TRIMP), TDC: TRIMP, number of impacts, and body load. Technical performance parameters included goal attempts, total number of tackles, tackles and interceptions, total number of passes, and passes effectiveness. All physical performance parameters decreased from the first to the last quarter with notable declines in TDC, metabolic power and the frequency of sprints, accelerations and decelerations (P < 0.05; moderate to very large ES: 1.08 - 3.30). However, technical performance parameters did not vary across quarters (P > 0.05; trivial ES for 1st v 4th quarters: 0.15 - 0.33). The data demonstrate that technical performance is maintained despite substantial declines in physical performance during a SSG in elite youth players. This finding may have implications for designing SSG's for elite youth players to ensure physical, technical and tactical capabilities are optimized. Modifications in player number, pitch dimensions, rules, coach encouragement, for instance, should be included taking into account the main aim of a given session and then focused on overloading physical or technical elements.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.
The objectives of this seminar were to identify problems in evaluating literacy programs and to design a working strategy to confront them. Four presentations included national case studies from Brazil, Honduras, Nicaragua, and Venezuela. Central questions asked concerned who and what were evaluated and how were the results to be used. In Brazil,…
Technical Assistance to Developers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rockward, Tommy; Borup, Rodney L.; Garzon, Fernando H.
2012-07-17
This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols,more » and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.« less
A bibliography on formal methods for system specification, design and validation
NASA Technical Reports Server (NTRS)
Meyer, J. F.; Furchtgott, D. G.; Movaghar, A.
1982-01-01
Literature on the specification, design, verification, testing, and evaluation of avionics systems was surveyed, providing 655 citations. Journal papers, conference papers, and technical reports are included. Manual and computer-based methods were employed. Keywords used in the online search are listed.
Technical Presentation Session 6: Monitoring slides to presentation by Denbury on tracking water movement through fracture systems in the Barnett shale. This includes information on micro-seismic well evaluation, well plans, and a fracture map.
ERIC Educational Resources Information Center
Ohio State Dept. of Education, Columbus. Div. of Career-Technical and Adult Education.
This document presents the Ohio Integrated Technical and Academic Competency profile for sports marketing. The profile is to serve as the basis for curriculum development in Ohio's secondary, adult, and postsecondary programs. The profile includes a comprehensive listing of 999 specialty key indicators for evaluating mastery of 113 competencies in…
Evaluation of STOL navigation avionics
NASA Technical Reports Server (NTRS)
Dunn, W. R., Jr.
1977-01-01
Research projects, including work on a vector magnetometer for aircraft attitude measurement, are summarized. The earth's electric field phenomena was investigated in its application to aircraft control and navigation. Research on electronic aircraft cabin noise suppression is reviewed and strapdown inertial reference unit technical support is outlined.
NASA Technical Reports Server (NTRS)
Eldridge, W. M.; Ferrell, J. A.; Mckee, J. W.; Wayne, J. E., Jr.; Zabinsky, J. M.
1973-01-01
Conceptual designs of V/STOL lift fan commercial short haul transport aircraft for the 1980-85 time period were studied to determine their technical and economic feasibility. The engine concepts included both integral and remote fans. The scope of the study included definition of the hover control concept for each propulsion system, aircraft design, aircraft mass properties, cruise performance, noise and ride qualities evaluation. Economic evaluating was also studied on a basis of direct operating costs and route structure.
ERIC Educational Resources Information Center
Hatam, Amir Hussein; Shafiei, Shilan
2012-01-01
The purpose of the present study was twofold. Firstly, it tried to investigate the relationship between the technical English proficiency of the students of Mechanical Engineering in the universities of Iran and their technical translation proficiency in translating technical texts of Mechanics. Secondly, it attempted to evaluate the effectiveness…
ERIC Educational Resources Information Center
McCullough, Robert A.; And Others
This report presents the results of a review and evaluation of the Langley Research Center's scientific and technical information program, which examined technical reports from various institutions and organizations to determine the organization of reports, the language used to convey information, and the methods used to present information.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iguchi, Toshihiro, E-mail: iguchi@ba2.so-net.ne.jp; Hiraki, Takao, E-mail: takaoh@tc4.so-net.ne.jp; Gobara, Hideo, E-mail: gobara@cc.okayama-u.ac.jp
PurposeThe aim of the study was to retrospectively evaluate simultaneous multiple hook wire placement outcomes before video-assisted thoracoscopic surgery (VATS).Materials and MethodsThirty-eight procedures were performed on 35 patients (13 men and 22 women; mean age, 59.9 years) with 80 lung lesions (mean diameter 7.9 mm) who underwent simultaneous multiple hook wire placements for preoperative localizations. The primary endpoints were technical success, complications, procedure duration, and VATS outcome; secondary endpoints included comparisons between technical success rates, complication rates, and procedure durations of the 238 single-placement procedures performed. Complications were also evaluated.ResultsIn 35 procedures including 74 lesions, multiple hook wire placements were technically successful;more » in the remaining three procedures, the second target placement was aborted because of massive pneumothorax after the first placement. Although complications occurred in 34 procedures, no grade 3 or above adverse event was observed. The mean procedure duration was 36.4 ± 11.8 min. Three hook wires dislodged during patient transport to the surgical suite. Seventy-four successfully marked lesions were resected. Six lesions without hook wires were successfully resected after detection by palpation with an additional mini-thoracotomy or using subtle pleural changes as a guide. The complication rates and procedure durations of multiple-placement procedures were significantly higher (P = 0.04) and longer (P < 0.001) than those in the single-placement group, respectively, while the technical success rate was not significantly different (P = 0.051).ConclusionsSimultaneous multiple hook wire placements before VATS were clinically feasible, but increased the complication rate and lengthened the procedure time.« less
NASA Technical Reports Server (NTRS)
1976-01-01
The SPS concepts which appear to be technically feasible are discussed in terms of the economic viability and competitive costs with other energy sources. The concepts discussed include: power station, microwave reception and conversion, space construction and maintenance, space transportation, and program costs and analysis. The conclusions presented include: (1) The maximum output of an individual microwave transmission link to earth is about 5 GW. (2) The mass of 10 GW SPS is between 47,000,000 and 124,000,00 kg. (3) The silicon solar cell arrays make up well over half the weight and cost of the satellite. (4) The SPS in equatorial orbit will be eclipsed by the earth and by other satellites.
A review of the latest guidelines for NIBP device validation.
Alpert, Bruce S; Quinn, David E; Friedman, Bruce A
2013-12-01
The current ISO Standard is accepted as the National Standard in almost every industrialized nation. An overview of the most recently adopted standards is provided. Standards writing groups including the Advancement of Medical Instrumentation Sphygmomanometer Committee and ISO JWG7 are working to expand standardized evaluation methods to include the evaluation of devices intended for use in environments where motion artifact is common. An Association for the Advancement of Medical Instrumentation task group on noninvasive blood pressure measurement in the presence of motion artifact has published a technical information report containing research and standardized methods for the evaluation of blood pressure device performance in the presence of motion artifact.
Code of Federal Regulations, 2013 CFR
2013-01-01
... to Subpart I of Part 1944—Instructions for Preparation of Evaluation Report of Self-Help Technical... 7 Agriculture 13 2013-01-01 2013-01-01 false Instructions for Preparation of Evaluation Report of Self-Help Technical Assistance Grants B Exhibit B-1 to Subpart I of Part 1944 Agriculture Regulations...
Code of Federal Regulations, 2014 CFR
2014-01-01
... to Subpart I of Part 1944—Instructions for Preparation of Evaluation Report of Self-Help Technical... 7 Agriculture 13 2014-01-01 2013-01-01 true Instructions for Preparation of Evaluation Report of Self-Help Technical Assistance Grants B Exhibit B-1 to Subpart I of Part 1944 Agriculture Regulations...
Code of Federal Regulations, 2012 CFR
2012-01-01
... to Subpart I of Part 1944—Instructions for Preparation of Evaluation Report of Self-Help Technical... 7 Agriculture 13 2012-01-01 2012-01-01 false Instructions for Preparation of Evaluation Report of Self-Help Technical Assistance Grants B Exhibit B-1 to Subpart I of Part 1944 Agriculture Regulations...
NASA Technical Reports Server (NTRS)
Mulhall, B. D. L.
1980-01-01
The results of the economic analysis of the AIDS 3 system design are presented. AIDS 3 evaluated a set of economic feasibility measures including life cycle cost, implementation cost, annual operating expenditures and annual capital expenditures. The economic feasibility of AIDS 3 was determined by comparing the evaluated measures with the same measures, where applicable, evaluated for the current system. A set of future work load scenarios was constructed using JPL's environmental evaluation study of the fingerprint identification system. AIDS 3 and the current system were evaluated for each of the economic feasibility measures for each of the work load scenarios. They were compared for a set of performance measures, including response time and accuracy, and for a set of cost/benefit ratios, including cost per transaction and cost per technical search. Benefit measures related to the economic feasibility of the system are also presented, including the required number of employees and the required employee skill mix.
Technical and investigative support for high density digital satellite recording systems
NASA Technical Reports Server (NTRS)
1982-01-01
Availability of tape in suitable widths continue to obstruct standardized methods on tests where width is an important parameter. These tests include flexibility, coefficients of friction, and abrasivity. The Fuji Beridox tape samples evaluated were obtained from a 1/2 inch video cassette.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woodford, D.
This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands
Graduate Studies in Education. Volume 1, Number 3.
ERIC Educational Resources Information Center
Courtney, E. Wayne, Comp.; Heineke, William F., Comp.
As one part of a volume of abstracts of studies of the last decade primarily in the vocational and technical field, this report includes 213 abstracts in the categories of administration, curriculum, and evaluation. Abstracts in administration treat building programs, certification and qualification requirements, cooperative programs, cost…
Videoconferencing Via Satellite: Opening Congress to the People. Technical Report.
ERIC Educational Resources Information Center
Wood, Fred B.; And Others
The value of satellite videoconferencing in providing a new mechanism for informed dialogue between congressmen and constituents is evaluated through actual demonstrations. The experimental demonstrations described include large and small group congressional-constituent meetings in urban and rural areas, and a congressional subcommittee hearing…
Thermoelectric materials evaluation program. Technical summary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hinderman, J.D.
1979-04-01
Research progress on the thermoelectric materials evaluation program is reported covering the period January 1, 1976 to September 30, 1978. Topical reports are presented on (1) hot and cold end ..delta..T's, (2) hardware mobility, (3) p-leg sublimation suppression, (4) thermodynamic stability of p-legs, (5) n-leg material process improvements to reduce extraneous resistance, (6) n-leg cracking, (7) dynamic evaluation of converter, and (8) data base and degradation modes. Twenty attachments are included which present supporting drawings, specifications, procedures, and data. (WHK)
Criteria for evaluation of reflective surface for parabolic dish concentrators
NASA Technical Reports Server (NTRS)
Bouquet, F.
1980-01-01
Commercial, second surface glass mirror are emphasized, but aluminum and metallized polymeric films are also included. Criteria for sealing solar mirrors in order to prevent environmental degradation and criteria for bonding sagged or bent mirrors to substrate materials are described. An overview of the technical areas involved in evaluating small mirror samples, sections, and entire large gores is presented. A basis for mirror criteria was established that eventually may become part of inspection and evaluation techniques for three dimensional parabolic reflective surfaces.
1988-09-01
Unfortunately, although current construction practices can produce functional HVAC systems that provide adequate heating and cooling , they do not guarantee...developed by interviewing heating, ventilating, and air-conditioning ( HVAC ) profes- sionals, reviewing technical literature, and consolidating these...for recording this information. A glossary of possibly unfamiliar HVAC terms is included. An informal evaluation of the procedure showed that
Evaluating the effectiveness of case method instruction in technical communication
NASA Technical Reports Server (NTRS)
Feinberg, S. G.
1981-01-01
The effectiveness of the case method as an instructional technique in improving technical writing was evaluated. The development of a self-report instrument that attempts to measure changes in attitude toward technical communication and the presentation results change are the purpose of this paper. Standards for developing a case set forth by Goldstein and Couture, were used to design an evaluation instrument to measure the effect instruction on student attitude toward technical communication. This self-report instrument is based on model developed and tested by Daly and Miller who studied writer attitude and apprehension toward writing. It was the most important objective of any evaluation is to provide information for improving the program.
OTEC modular experiment cold water pipe concept evaluation. Volume III. Appendices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-04-01
The Cold Water Pipe System Design Study was undertaken to evaluate the diverse CWP concepts, recommend the most viable alternatives for a 1984 deployment of the 10 to 40 MWe MEP, and carry out preliminary designs of three concepts. The concept evaluation phase reported involved a systems analysis of design alternatives in the broad categories of rigid walled (with hinges), compliant walled, stockade and bottom mounted buoyant. Quantitative evaluations were made of concept performance, availability, deployment schedule, technical feasibility and cost. CWP concepts were analyzed to determine if they met or could be made to meet established system requirements andmore » could be deployed by 1984. Fabrication, construction and installation plans were developed for successful concepts, and costs were determined in a WBS format. Evaluations were performed on the basis of technical and cost risk. This volume includes the following appendices: (A) materials and associated design criteria; (B) summary of results of dynamic flow and transportation analysis; (C) CWP sizing analysis; (D) CWP thermal performance; and (E) investigation of the APL/ABAM CWP design. (WHK)« less
Murphy, Terrence E; Gaughan, Monica; Hume, Robert; Moore, S Gordon
2010-03-01
There are many approaches to solving the problem of underrepresentation of some racial and ethnic groups and women in scientific and technical disciplines. Here, the authors evaluate the association of a summer bridge program with the graduation rate of underrepresented minority (URM) students at a selective technical university. They demonstrate that this 5-week program prior to the fall of the 1st year contains elements reported as vital for successful student retention. Using multivariable survival analysis, they show that for URM students entering as fall-semester freshmen, relative to their nonparticipating peers, participation in this accelerated summer bridge program is associated with higher likelihood of graduation. The longitudinal panel data include more than 2,200 URM students.
The composing process in technical communications
NASA Technical Reports Server (NTRS)
Hertz, V. L.
1981-01-01
The theoretical construct under which technical writing exercises operate and results from a survey distributed to a random sample of teachers of technical writing are described. The survey, part of a study to develop materials that did not stress prescriptive formats, drew on diverse elements in report writing to enhance writing as a process. Areas of agreement and disagreement related to problem solving, paper evaluation, and individualizing instruction were surveyed. Areas of concern in contemplating the composition process include: (1) the need to create an environment that helps students want to succeed, (2) the role of peer group activity in helping some students who might not respond through lecture or individual study, and (3) encouraging growth in abilities and helping motivate students' interest in writing projects through relevant assignments or simulations students perceive as relevant.
Murphy, Terrence E.; Gaughan, Monica; Hume, Robert; Moore, S. Gordon
2012-01-01
There are many approaches to solving the problem of underrepresentation of some racial and ethnic groups and women in scientific and technical disciplines. Here, the authors evaluate the association of a summer bridge program with the graduation rate of underrepresented minority (URM) students at a selective technical university. They demonstrate that this 5-week program prior to the fall of the 1st year contains elements reported as vital for successful student retention. Using multivariable survival analysis, they show that for URM students entering as fall-semester freshmen, relative to their nonparticipating peers, participation in this accelerated summer bridge program is associated with higher likelihood of graduation. The longitudinal panel data include more than 2,200 URM students. PMID:23136456
Haegerich, Tamara M; David-Ferdon, Corinne; Noonan, Rita K; Manns, Brian J; Billie, Holly C
2016-09-07
Injury and violence prevention strategies have greater potential for impact when they are based on scientific evidence. Systematic reviews of the scientific evidence can contribute key information about which policies and programs might have the greatest impact when implemented. However, systematic reviews have limitations, such as lack of implementation guidance and contextual information, that can limit the application of knowledge. "Technical packages," developed by knowledge brokers such as the federal government, nonprofit agencies, and academic institutions, have the potential to be an efficient mechanism for making information from systematic reviews actionable. Technical packages provide information about specific evidence-based prevention strategies, along with the estimated costs and impacts, and include accompanying implementation and evaluation guidance to facilitate adoption, implementation, and performance measurement. We describe how systematic reviews can inform the development of technical packages for practitioners, provide examples of technical packages in injury and violence prevention, and explain how enhancing review methods and reporting could facilitate the use and applicability of scientific evidence. © The Author(s) 2016.
Evaluating Technical Communication Faculty: Some Empirically-Based Criteria and Guidelines. Draft.
ERIC Educational Resources Information Center
Stevenson, Dwight W.
As technical communication is a young academic discipline, evaluating technical communication faculty for promotion, tenure, and merit purposes requires special awareness and care. To determine reasonable expectations of faculty achievement, a study documented the range, types, and frequency of activities of 12 professors and 12 associate…
48 CFR 315.306 - Exchanges with offerors after receipt of proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... establishment of the competitive range. The Project Officer or technical evaluation panel shall develop technical questions as part of the technical evaluation report. The questions shall disclose the ambiguities... practicable, all questions and answers shall be in writing. The Contracting Officer shall give each offeror in...
41 CFR 105-50.001-5 - Specialized or technical services.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., technical tests and evaluations, technical information, training activities, surveys, reports, documents... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Specialized or technical... TECHNICAL SERVICES TO STATE AND LOCAL UNITS OF GOVERNMENT § 105-50.001-5 Specialized or technical services...
48 CFR 313.106-2 - Evaluation of quotations or offers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Evaluation of quotations... Evaluation of quotations or offers. (b)(5) Technical Evaluation. When conducting a technical evaluation of quotations or proposals received under FAR Part 13, the provisions of 315.305(a)(3) apply. ...
Non-technical skills assessment in surgery.
Sharma, Bharat; Mishra, Amit; Aggarwal, Rajesh; Grantcharov, Teodor P
2011-09-01
Adverse events in surgery have highlighted the importance of non-technical skills, such as communication, decision-making, teamwork, situational awareness and leadership, to effective organizational performance. These skills carry particular importance to surgical oncology, as members of a multidisciplinary team must work cohesively to formulate effective patient care plans. Several non-technical skills evaluation tools have been developed for use in surgery, without adequate comparison and consensus on which should be standard for training. Eleven articles describing the use of three non-technical evaluation tools related to surgery: NOTSS (Non Technical Skills for Surgeons), NOTECHS (Non Technical Skills) and OTAS (Observational Teamwork Assessment for Surgery) were analyzed with respect to scale formulation, validity, reliability and feasibility. Furthermore, their use in training thus far and the future of non-technical rating scales in surgical curricula was discussed. Future work should focus on incorporating these assessment tools into training and into a real operating room setting to provide formative evaluations for surgical residents. Copyright © 2010 Elsevier Ltd. All rights reserved.
Murray, Kara; McKenzie, Karen; Kelleher, Michael
2016-10-01
The importance of non-technical skills (NTS) to patient outcomes is increasingly being recognised, however, there is limited research into how such skills can be taught and evaluated in student nurses in relation toward rounds. This pilot study describes an evaluation of a NTS framework that could potentially be used to measure ward round skills of student nurses. The study used an observational design. Potential key NTS were identified from existing literature and NTS taxonomies. The proposed framework was then used to evaluate whether the identified NTS were evident in a series of ward round simulations that final year general nursing students undertook as part of their training. Finally, the views of a small group of qualified nurse educators, qualified nurses and general nursing students were sought about whether the identified NTS were important and relevant to practice. The proposed NTS framework included seven categories: Communication, Decision Making, Situational Awareness, Teamwork and Task Management, Student Initiative and Responsiveness to Patient. All were rated as important and relevant to practice. The pilot study suggests that the proposed NTS framework could be used as a means of evaluating student nurse competencies in respect of many non-technical skills required for a successful ward round. Further work is required to establish the validity of the framework in educational settings and to determine the extent to which it is of use in a non-simulated ward round setting. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Mohamed, Abdullah-Adnan; Asmawi, Adelina; Hamid, Mohd Rashid Ab; Mustafa, Zainol bin
2015-02-01
This paper reports a pilot study of Context Evaluation using a self-developed questionnaire distributed among engineering undergraduates at a university under study. The study aims to validate the self-developed questionnaires used in the Context evaluation, a component in the CIPP Model. The Context evaluation assesses background information for needs, assets, problems and opportunities relevant to beneficiaries of the study in a defined environment. Through the questionnaire, background information for the assessment of needs, assets and problems related to the engineering undergraduates' perceptions on the teaching and learning of technical oral presentation skills was collected and analysed. The questionnaire was developed using 5-points Likert scale to measure the constructs under study. They were distributed to 100 respondents with 79 returned. The respondents consisted of engineering undergraduates studied at various faculties at one technical university in Malaysia. The descriptive analysis of data for each item which makes up the construct for Context evaluation is found to be high. This implied that engineering undergraduates showed high interest in teaching and learning of technical oral presentation skills, thus their needs are met. Also, they agreed that assets and facilities are conducive to their learning. In conclusion, the context evaluation involving needs and assets factors are both considerably important; their needs are met and the assets and facilities do support their technical oral presentation skills learning experience.
Mammographic Density Estimation with Automated Volumetric Breast Density Measurement
Ko, Su Yeon; Kim, Eun-Kyung; Kim, Min Jung
2014-01-01
Objective To compare automated volumetric breast density measurement (VBDM) with radiologists' evaluations based on the Breast Imaging Reporting and Data System (BI-RADS), and to identify the factors associated with technical failure of VBDM. Materials and Methods In this study, 1129 women aged 19-82 years who underwent mammography from December 2011 to January 2012 were included. Breast density evaluations by radiologists based on BI-RADS and by VBDM (Volpara Version 1.5.1) were compared. The agreement in interpreting breast density between radiologists and VBDM was determined based on four density grades (D1, D2, D3, and D4) and a binary classification of fatty (D1-2) vs. dense (D3-4) breast using kappa statistics. The association between technical failure of VBDM and patient age, total breast volume, fibroglandular tissue volume, history of partial mastectomy, the frequency of mass > 3 cm, and breast density was analyzed. Results The agreement between breast density evaluations by radiologists and VBDM was fair (k value = 0.26) when the four density grades (D1/D2/D3/D4) were used and moderate (k value = 0.47) for the binary classification (D1-2/D3-4). Twenty-seven women (2.4%) showed failure of VBDM. Small total breast volume, history of partial mastectomy, and high breast density were significantly associated with technical failure of VBDM (p = 0.001 to 0.015). Conclusion There is fair or moderate agreement in breast density evaluation between radiologists and VBDM. Technical failure of VBDM may be related to small total breast volume, a history of partial mastectomy, and high breast density. PMID:24843235
Evaluation results of xTCA equipment for HEP experiments at CERN
NASA Astrophysics Data System (ADS)
Di Cosmo, M.; Bobillier, V.; Haas, S.; Joos, M.; Mico, S.; Vasey, F.; Vichoudis, P.
2013-12-01
The MicroTCA and AdvancedTCA industry standards are candidate modular electronic platforms for the upgrade of the current generation of high energy physics experiments. The PH-ESE group at CERN launched in 2011 the xTCA evaluation project with the aim of performing technical evaluations and eventually providing support for commercially available components. Different devices from different vendors have been acquired, evaluated and interoperability tests have been performed. This paper presents the test procedures and facilities that have been developed and focuses on the evaluation results including electrical, thermal and interoperability aspects.
Exposure and Human Health Evaluation of Airborne Pollution from the World Trade Center Disaster
In the days following the September 11, 2001, terrorist attack on New York City's World Trade Center (WTC) towers, many Federal agencies, including the U.S. Environmental Protection Agency (EPA), were called upon to bring their technical and scientific expertise to the national e...
ESEA Title I Migrant. Final Technical Report. Publication 80.40.
ERIC Educational Resources Information Center
Austin Independent School District, TX. Office of Research and Evaluation.
Data from 24 instruments used to evaluate the 1980-81 ESEA Title I Migrant program in the Austin (Texas) Independent School District are presented. A separate section for each instrument includes a description of purpose; procedures and results; and, where appropriate, relevant communications, instructions and statistical data. Summaries describe…
Profiles of Schools in Change: Four Urban High Schools.
ERIC Educational Resources Information Center
Wermuth, Thomas R.; And Others
1997-01-01
This report highlights four urban comprehensive secondary schools that are developing, implementing, and evaluating reform initiatives that include vocational and technical education as a key component of these efforts. Efforts of these four high schools are described: Bryan High School, Omaha, Nebraska; Humboldt Secondary Complex, St. Paul,…
NASA Technical Reports Server (NTRS)
1986-01-01
This publication is a compilation of abstracts and slides of papers presented at the NASA Lewis Structural Ceramics Workshop. Collectively, these papers depict the scope of NASA Lewis' structural ceramics program. The technical areas include monolithic SiC and Si3N4 development, ceramic matrix composites, tribology, design methodology, nondestructive evaluation (NDE), fracture mechanics, and corrosion.
Meeting Stakeholder Energy Technology Education Needs Using a Mobile Demonstration
ERIC Educational Resources Information Center
de Koff, Jason P.; Ricketts, John C.; Robbins, Chris; Illukpitiya, Prabodh; Wade, Alvin
2017-01-01
Understanding the impact of workshops that include mobile demonstrations for describing technical applications can be useful when planning an Extension program on new energy technologies. We used a mobile demonstration in a workshop that provided information on small-scale on-farm biodiesel production. Evaluation of the workshop outcomes…
Success Prediction: A DDC Bibliography. December 1949--December 1971.
ERIC Educational Resources Information Center
Defense Documentation Center, Alexandria, VA.
This document contains bibliographic information, descriptive terms, and abstracts for 145 technical reports on the general subject of success prediction. The bibliography includes reports on development of individuals during military training, peer evaluation, biographical inventory, and the validity of tests which may be used as predictors of…
This research study examined how water quality collection and filtration approaches, including commonly used capsule and disc syringe filters, may cause losses in the amounts of soluble lead and copper found in a sample. A variety of commercially available filter materials with a...
Ornamental Horticulture Technology; Suggested 2-Year Post High School Curriculums.
ERIC Educational Resources Information Center
Bureau of Adult, Vocational, and Technical Education (DHEW/OE), Washington, DC. Div. of Vocational and Technical Education.
Developed by a technical education specialist, this guide is designed to aid school administrators in planning and developing 2-year post-high school programs or evaluating existing programs in ornamental horticulture technology. In addition to general information on the program, contents include course outlines with examples of tests and…
Business Administration Scale for Family Child Care, BAS
ERIC Educational Resources Information Center
Talan, Teri N.; Bloom, Paula Jorde
2009-01-01
The "BAS for Family Child Care" is the first valid and reliable tool for measuring and improving the overall quality of business and professional practices in family child care settings. It is applicable for multiple uses, including program self-improvement, technical assistance and monitoring, training, research and evaluation, and public…
Have More Fun Teaching Physics: Simulating, Stimulating Software.
ERIC Educational Resources Information Center
Jenkins, Doug
1996-01-01
High school physics offers opportunities to use problem solving and lab practices as well as cement skills in research, technical writing, and software applications. Describes and evaluates computer software enhancing the high school physics curriculum including spreadsheets for laboratory data, all-in-one simulators, projectile motion simulators,…
Air Force Information Publishing Service 902-S Procurement Program
1993-03-22
34- ^ D. 0. Cooks Director 65 This J>age was- left out of original document U» DEPARTMENT OF THE NAVY THE ASSISTAMT SECRETARY Of THC MAW (Wwwth...including Technical and’Management Factor and Sob- Factor personnel, and Cost Factor Evaluation Team; CBD advertising; Bidden Conference; and
Quality? Is it Allowed? FACTC Focus, 2006
ERIC Educational Resources Information Center
Doerr, Mark, Ed.
2006-01-01
"FACTC Focus" is a publication of Faculty Association of Community and Technical Colleges (FACTC) with the purpose of presenting diverse views on faculty issues. Included in this issue are: (1) Shooting In The Dark: Evaluating Distance Learning Instruction (Stephanie Delaney); (2) Trust Who? - Trust and Learning: Crafting a Conversation That…
NASA Technical Reports Server (NTRS)
Goldman, H.; Wolf, M.
1979-01-01
The manufacturing methods for photovoltaic solar energy utilization are assessed. Economic and technical data on the current front junction formation processes of gaseous diffusion and ion implantation are presented. Future proposals, including modifying gaseous diffusion and using ion implantation, to decrease the cost of junction formation are studied. Technology developments in current processes and an economic evaluation of the processes are included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedman, P.O.; Smoot, L.D.; Smith, P.J.
1987-10-15
The general purpose of this research program was to develop a basic understanding of the physical and chemical processes in entrained coal gasification and to use the results to improve and evaluate an entrained gasification computer model. The first task included the collection and analysis of in-situ gasifier data at elevated pressures with three coal types (North Dakota lignite, Wyoming subbituminous and Illinois bituminous), the design, construction, and testing of new coal/oxygen/steam injectors with a fourth coal type (Utah bituminous), the collection of supporting turbulent fluid dynamic (LDV) data from cold-flow studies, and the investigation of the feasibility of usingmore » laser-based (CARS) daignostic instruments to make measurements in coal flames. The second task included improvements to the two-dimensional gasifier submodels, tabulation and evaluation of new coal devolatilization and char oxidation data for predictions, fundamental studies of turbulent particle dispersion, the development of improved numerical methods, and validation of the comprehensive model through comparison of predictions with experimental results. The third task was to transfer technical advances to industry and to METC through technical seminars, production of a detailed data book, code placement, and publication of results. Research results for these three tasks are summarized briefly here and presented in detail in the body of the report and in supporting references. 202 refs., 73 figs., 23 tabs.« less
Post-acute crisis text messaging outreach for suicide prevention: a pilot study.
Berrouiguet, Sofian; Gravey, Michel; Le Galudec, Mickaël; Alavi, Zarrin; Walter, Michel
2014-07-30
Several post-suicide prevention strategies such as sending postcards or making phone calls have been used to keep in contact with suicide attempters. The continuity of care has been beneficial to the prevention of post-acute suicidal behaviors. The aim of the study was to evaluate the technical feasibility and acceptability of text messaging outreach in post-acute suicide attempters. Eighteen post-suicidal patients were included in a prospective, monocentric, open-label, 2 months pilot study. The text messages were sent from the intranet program that we specially developed for the study. Technical feasibility of this text message intervention was evaluated by the analysis of text message reports. Acceptability of such intervention was evaluated by a standardized phone interview. Our study showed that receiving text messages sent from an intranet program after a suicide attempt is technically possible. This post-crisis outreach program was accepted by the patients who found it to have a positive preventive impact. Text messaging outreach offers several advantages such as lower cost, and easier utilization compared to current post-acute care strategies. We suggest further randomized controlled trials in a large sample of suicidal patients to assess the efficacy of this novel outreach tool for prevention of post-acute suicide. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
National Evaluation of the IDEA Technical Assistance & Dissemination Program. NCEE 2014-4000
ERIC Educational Resources Information Center
Daley,Tamara C.; Fiore, Thomas A.; Bollmer, Julie; Nimkoff, Tamara; Lysy, Chris
2013-01-01
Under the Individuals with Disabilities Education Act (IDEA), the Technical Assistance and Dissemination (TA&D) Program is the U.S. Department of Education's (ED) primary vehicle for providing technical assistance (TA) to individuals and organizations responsible for serving children with disabilities and their families. The evaluation is part…
Non-Functional Property Driven Service Governance: Performance Implications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, Yan; Zhu, Liming; Bass, Len
2007-09-17
Service governance is a set of businesses processes, policies and technical solutions that support enterprises in their implementation and management of their SOA. The decisions of service governance, especially concerning service boundaries at the enterprise level, influence the deployment topology of business services across or within business organizations. Deployment topologies are realized by integration technologies such as Enterprise Service Bus (ESB). Service governance and technical solutions interact in a subtle way including through communication patterns and protocols between services and ESBs, as well as the deployment and configuration of ESB. These factors have a strong influence on the Non- Functionalmore » Properties (NFP) of a SOA solution. A systematic approach is essential to understand alternative technical solutions for a specific service governance decision. This paper proposes a modeling approach to evaluate the performance-related NFP impacts when mapping service governance to technical solutions using an ESB. This approach is illustrated by the quantitative performance analysis of a real« less
An SNMP-based solution to enable remote ISO/IEEE 11073 technical management.
Lasierra, Nelia; Alesanco, Alvaro; García, José
2012-07-01
This paper presents the design and implementation of an architecture based on the integration of simple network management protocol version 3 (SNMPv3) and the standard ISO/IEEE 11073 (X73) to manage technical information in home-based telemonitoring scenarios. This architecture includes the development of an SNMPv3-proxyX73 agent which comprises a management information base (MIB) module adapted to X73. In the proposed scenario, medical devices (MDs) send information to a concentrator device [designated as compute engine (CE)] using the X73 standard. This information together with extra information collected in the CE is stored in the developed MIB. Finally, the information collected is available for remote access via SNMP connection. Moreover, alarms and events can be configured by an external manager in order to provide warnings of irregularities in the MDs' technical performance evaluation. This proposed SNMPv3 agent provides a solution to integrate and unify technical device management in home-based telemonitoring scenarios fully adapted to X73.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-11-01
The report includes information and material from a technical review workshop organized by the U.S. Environmental Protection Agency`s (EPA`s) Risk Assessment Forum for EPA`s Reference Dose/Reference Concentration (RfD/RfC) Work Group. The meeting was held in Washington, DC, at the Barcelo Washington Hotel on May 24-25, 1994. The subject of the technical review was the Integrated Risk Information System (IRIS) RfD entry for Aroclor 1016, a polychlorinated biphenyl (PCB). The expert technical review panel was convened to independently evaluate whether the RfD for Aroclor 1016 is based on a scientifically responsible analysis that represents full consideration of the available data andmore » clean articulation of that analysis in the IRIS RfD entry. EPA also requested panel members to consider four broad options for the Aroclor 1016 RfD as potential recommendations to the RfD/RfC Work Group.« less
2002-03-01
source term. Several publications provided a thorough accounting of the accident, including “ Chernobyl Record” [Mould], and the NRC technical report...Report on the Accident at the Chernobyl Nuclear Power Station” [NUREG-1250]. The most comprehensive study of transport models to predict the...from the Chernobyl Accident: The ATMES Report” [Klug, et al.]. The Atmospheric Transport 5 Model Evaluation Study (ATMES) report used data
Evaluation of a 15-inch widescreen OLED with sunlight-readable resistive touch panel
NASA Astrophysics Data System (ADS)
Hufnagel, Bruce D.; Tchon, Joseph L.; Bahadur, Birendra
2012-06-01
A commercially available 15-inch active-matrix organic light-emitting diode (AMOLED) television was modified to include a sunlight-readable resistive touch panel for technical evaluation with regard to a variety of rugged military and aerospace applications. By removing the circular polarizer (CP) from the AMOLED and relying on the touch panel's CP, the authors were able to minimize change in display luminance while adding touch capability and reducing reflectance.
RTO Technical Publications: A Quarterly Listing
NASA Technical Reports Server (NTRS)
2005-01-01
This is a listing of recent unclassified RTO technical publications processed by the NASA Center for AeroSpace Information covering the period from July 1, 2005 to September 30, 2005; and available in the NASA Aeronautics and Space Database. Contents include: Aeroelastic Deformation: Adaptation of Wind Tunnel Measurement Concepts to Full-Scale Vehicle Flight Testing; Actively Controlling Buffet-Induced Excitations; Modelling and Simulation to Address NATO's New and Existing Military Requirements; Latency in Visionic Systems: Test Methods and Requirements; Personal Hearing Protection including Active Noise Reduction; Virtual Laboratory Enabling Collaborative Research in Applied Vehicle Technologies; A Method to Analyze Tail Buffet Loads of Aircraft; Particle Image Velocimetry Measurements to Evaluate the Effectiveness of Deck-Edge Columnar Vortex Generators on Aircraft Carriers; Introduction to Flight Test Engineering, Volume 14; Pathological Aspects and Associated Biodynamics in Aircraft Accident Investigation;
Movement evaluation of front crawl swimming: Technical skill versus aesthetic quality
2017-01-01
The study aim was to compare expert with non-expert swimmers’ rating of the aesthetic and technical qualities of front crawl in video-taped recordings of swimmers with low, middle, and high level proficiency. The results suggest that: i) observers’ experience affects their judgment: only the expert observers correctly rated the swimmers’ proficiency level; ii) evaluation of movement (technical and aesthetic scores) is correlated with the level of skill as expressed in the kinematics of the observed action (swimming speed, stroke frequency, and stroke length); iii) expert and non-expert observers use different strategies to rate the aesthetic and technical qualities of movement: equating the technical skill with the aesthetic quality is a general rule non-expert observers follow in the evaluation of human movement. PMID:28886063
Crowdsourcing: a valid alternative to expert evaluation of robotic surgery skills.
Polin, Michael R; Siddiqui, Nazema Y; Comstock, Bryan A; Hesham, Helai; Brown, Casey; Lendvay, Thomas S; Martino, Martin A
2016-11-01
Robotic-assisted gynecologic surgery is common, but requires unique training. A validated assessment tool for evaluating trainees' robotic surgery skills is Robotic-Objective Structured Assessments of Technical Skills. We sought to assess whether crowdsourcing can be used as an alternative to expert surgical evaluators in scoring Robotic-Objective Structured Assessments of Technical Skills. The Robotic Training Network produced the Robotic-Objective Structured Assessments of Technical Skills, which evaluate trainees across 5 dry lab robotic surgical drills. Robotic-Objective Structured Assessments of Technical Skills were previously validated in a study of 105 participants, where dry lab surgical drills were recorded, de-identified, and scored by 3 expert surgeons using the Robotic-Objective Structured Assessments of Technical Skills checklist. Our methods-comparison study uses these previously obtained recordings and expert surgeon scores. Mean scores per participant from each drill were separated into quartiles. Crowdworkers were trained and calibrated on Robotic-Objective Structured Assessments of Technical Skills scoring using a representative recording of a skilled and novice surgeon. Following this, 3 recordings from each scoring quartile for each drill were randomly selected. Crowdworkers evaluated the randomly selected recordings using Robotic-Objective Structured Assessments of Technical Skills. Linear mixed effects models were used to derive mean crowdsourced ratings for each drill. Pearson correlation coefficients were calculated to assess the correlation between crowdsourced and expert surgeons' ratings. In all, 448 crowdworkers reviewed videos from 60 dry lab drills, and completed a total of 2517 Robotic-Objective Structured Assessments of Technical Skills assessments within 16 hours. Crowdsourced Robotic-Objective Structured Assessments of Technical Skills ratings were highly correlated with expert surgeon ratings across each of the 5 dry lab drills (r ranging from 0.75-0.91). Crowdsourced assessments of recorded dry lab surgical drills using a validated assessment tool are a rapid and suitable alternative to expert surgeon evaluation. Copyright © 2016 Elsevier Inc. All rights reserved.
Chiappone, Alethea; Smith, Teresa M; Estabrooks, Paul A; Rasmussen, Cristy Geno; Blaser, Casey; Yaroch, Amy L
2018-04-26
The National Early Care and Education Learning Collaboratives Project (ECELC) aims to improve best practices in early care and education (ECE) programs in topic areas of the Nutrition and Physical Activity Self-Assessment in Child Care (NAP SACC). Technical assistance is a component of the ECELC, yet its effect on outcomes is unclear. Beyond dose and duration of technical assistance, limited research exists on characteristics of technical assistance that contribute to outcomes. The objective of this study was to identify and describe technical assistance characteristics and explore associations with NAP SACC outcomes. We collected data from 10 collaboratives comprising 84 ECE programs in 2 states in 2015-2016. The objective of technical assistance was to support programs in improving best practices. Technical assistance was provided to programs via on-site, telephone, or email and was tailored to program needs. We used a mixed-methods design to examine associations between technical assistance and NAP SACC outcomes. We used multiple regression analysis to assess quantitative data and qualitative comparative analysis to determine necessary and sufficient technical assistance conditions supporting NAP SACC outcomes. We also conducted a document review to describe technical assistance that referred conditions identified by the qualitative comparative analysis. Regression analyses detected an inverse relationship between changes in NAP SACC scores and hours of technical assistance. No clear pattern emerged in the qualitative comparative analysis, leaving no necessary and sufficient conditions. However, the qualitative comparative analysis identified feedback as a potentially important component of technical assistance, whereas resource sharing and frequent email were characteristics that seemed to reduce the likelihood of improved outcomes. Email and resource sharing were considered primarily general information rather than tailored technical assistance. Technical assistance may be used in programs and made adaptable to program needs. The inclusion and evaluation of technical assistance, especially tailored approaches, is warranted for environmental interventions, including ECE settings.
Aerospace medicine and biology: A continuing bibliography with indexes (supplement 395)
NASA Technical Reports Server (NTRS)
1994-01-01
This bibliography lists 82 reports, articles and other documents introduced into the NASA Scientific and Technical Information System during Nov. 1992. Subject coverage includes: general life sciences; aerospace medicine (including physiological factors, biological effects of radiation, and effects of weightlessness on man and animals); behavioral sciences (including psychological factors, individual and group behavior, crew training and evaluation, and psychic research); man/system technology and life support (including human engineering, biotechnology, and space suits and protective clothing) and space biology (including exobiology, planetary biology, and extraterrestrial life).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosenthal, A
Southwest Technology Development Institute (SWTDI), an independent, university-based research institute, has been the operator of the Southwest Region Photovoltaic Experiment Station (SWRES) for almost 30 years. The overarching mission of SWTDI is to position PV systems and solar technologies to become cost-effective, major sources of energy for the United States. Embedded in SWTDI's general mission has been the more-focused mission of the SWRES: to provide value added technical support to the DOE Solar Energy Technologies Program (SETP) to effectively and efficiently meet the R&D needs and targets specified in the SETP Multi-Year Technical Plan. : The DOE/SETP goals of growingmore » U.S. PV manufacturing into giga-watt capacities and seeing tera-watt-hours of solar energy production in the U.S. require an infrastructure that is under development. The staff of the SWRES has supported DOE/SETP through a coherent, integrated program to address infrastructural needs inhibiting wide-scale PV deployment in three major technical categories: specialized engineering services, workforce development, and deployment facilitation. The SWRES contract underwent three major revisions during its five year period-of- performance, but all tasks and deliverables fell within the following task areas: Task 1: PV Systems Assistance Center 1. Develop a Comprehensive multi-year plan 2. Provide technical workforce development materials and workshops for PV stakeholder groups including university, professional installers, inspectors, state energy offices, Federal agencies 3. Serve on the NABCEP exam committee 4. Provide on-demand technical PV system design reviews for U.S. PV stakeholders 5. Provide PV system field testing and instrumentation, technical outreach (including extensive support for the DOE Market Transformation program) Task 2: Design-for-Manufacture PV Systems 1. Develop and install 18 kW parking carport (cost share) and PV-thermal carport (Albuquerque) deriving and publishing lessons learned Task 3: PV Codes and Standards 1. Serve as the national lead for development and preparation of all proposals (related to PV) to the National Electrical Code 2. Participate in the Standards Technical Panels for modules (UL1703) and inverters (UL1741) Task 4: Assess Inverter Long Term Reliability 1. Install and monitor identical inverters at SWRES and SERES 2. Operate and monitor all inverters for 5 years, characterizing all failures and performance trends Task 5: Test and Evaluation Support for Solar America Initiative 1. Provide test and evaluation services to the National Laboratories for stage gate and progress measurements of SAI TPP winners« less
Aeronautical Engineering: A special bibliography with indexes, supplement 13
NASA Technical Reports Server (NTRS)
1972-01-01
This special bibliography lists 283 reports, articles, and other documents introduced into the NASA scientific and technical information system in December, 1971. Emphasis is placed on engineering and theoretical aspects for design, construction, evaluation, testing, operation and performance of aircraft (including aircraft engines), and associated components, equipment and systems. Also included are entries on research and development in aeronautics and aerodynamics and research and ground support for aeronautical vehicles.
Aeronautical Engineering, a special bibliography with indexes, supplement 15
NASA Technical Reports Server (NTRS)
1972-01-01
This special bibliography lists 363 reports, articles, and other documents introduced into the NASA scientific and technical information system in January 1972. Emphasis is placed on engineering and theoretical aspects for design, construction, evaluation, testing, operation and performance of aircraft (including aircraft engines) and associated components, equipment and systems. Also included are entries on research and development in aeronautics and aerodynamics and research and ground support for aeronautical vehicles.
JV Task 120 - Coal Ash Resources Research Consortium Research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Debra Pflughoeft-Hassett; Loreal Heebink; David Hassett
2009-03-28
The Coal Ash Resources Research Consortium{reg_sign} (CARRC{reg_sign}, pronounced 'cars') is the core coal combustion product (CCP) research group at the Energy & Environmental Research Center (EERC). CARRC focuses on performing fundamental and applied scientific and engineering research emphasizing the environmentally safe, economical use of CCPs. CARRC member organizations, which include utilities and marketers, are key to developing industry-driven research in the area of CCP utilization and ensuring its successful application. The U.S. Department of Energy is a partner in CARRC through the EERC Jointly Sponsored Research Program, which provides matching funds for industrial member contributions and facilitates an increased levelmore » of effort in CARRC. CARRC tasks were designed to provide information on CCP performance, including environmental performance, engineering performance, favorable economics, and improved life cycle of products and projects. CARRC technical research tasks are developed based on member input and prioritization. CARRC special projects are developed with members and nonmembers to provide similar information and to support activities, including the assembly and interpretation of data, support for standards development and technology transfer, and facilitating product development and testing. CARRC activities from 2007 to 2009 included a range of research tasks, with primary work performed in laboratory tasks developed to answer specific questions or evaluate important fundamental properties of CCPs. The tasks were included in four categories: (1) Environmental Evaluations of CCPs; (2) Evaluation of Impacts on CCPs from Emission Controls; (3) Construction and Product-Related Activities; and (4) Technology Transfer and Maintenance Tasks. All tasks are designed to work toward achieving the CARRC overall goal and supporting objectives. The various tasks are coordinated in order to provide broad and useful technical data for CARRC members. Special projects provide an opportunity for non-CARRC members to sponsor specific research or technology transfer consistent with CARRC goals. This report covers CARRC activities from January 2007 through March 2009. These activities have been reported in CARRC Annual Reports and in member meetings over the past 2 years. CARRC continues to work with industry and various government agencies with its research, development, demonstration, and promotional activities nearing completion at the time of submission of this report. CARRC expects to continue its service to the coal ash industry in 2009 and beyond to work toward the common goal of advancing coal ash utilization by solving CCP-related technical issues and promoting the environmentally safe, technically sound, and economically viable management of these complex and changing materials.« less
Rosenlof, L K; Earnhardt, R C; Pruett, T L; Stevenson, W C; Douglas, M T; Cornett, G C; Hanks, J B
1992-01-01
Pancreas transplantation has evolved dramatically since its introduction in 1966. As new centers for transplantation have developed, the evaluation of complications associated with pancreas transplantation has led to advances in surgical technique. Furthermore, surgical alterations of the pancreas resulting from transplantation (systemic release of insulin and denervation) are of unproven consequence on glucose metabolism. Since 1988, the authors have performed 21 transplants (16 combined pancreas/kidney, 3 pancreas alone, which includes 1 retransplantation, 1 pancreas after previous kidney transplant, and 1 "cluster") in 20 patients aged 18 to 49 years; mean, 35 +/- 1 years. Overall patient survival is 95%. Three pancreatic grafts failed within the first year because of technical failure; one additional pancreas was lost to an immunologic event on postoperative day 449, for an overall pancreatic graft survival of 81%. No renal grafts were lost. To evaluate causes of graft failure, demographic data were compared, which included age and sex of the donor and the recipient, operative time, intraoperative blood transfusion, and ischemic time of the graft. No statistically significant differences were found between groups except for ischemic time (11.7 +/- 6.4 hours for the technical success group versus 19.8 +/- 3.7 hours for the technical failure group; p less than 0.05 by unpaired Student's t test). Quadruple immunosuppression was used, which included prednisone, cyclosporine, azathioprine, and antilymphoblast globulin. A mean of 1.2 (range, 0 to 3) rejection episodes per patient occurred. Mean hospital stay was 24 +/- 11 days. Surgical and infectious complications were evaluated by comparing the technical success (TS) group (n = 17) with the technical failure (TF) group. Surgical complications in the TS group revealed a mean of 1.3 episodes per patient, whereas the TF group had 3.7 episodes per patient. The TS also had a reduced incidence of infectious complications compared with the TF (1.7 versus 4.3 episodes per patient). Cytomegalovirus was common in both groups, accounting for 11 infectious episodes, and occurred on a mean postoperative day of 38. Mean postoperative HbA1C levels dropped to 5 +/- 1% from 11 +/- 3%. The authors developed a new technique that incorporates portal drainage of the pancreatic venous effluent in three recipients. Preoperative metabolic studies disclosed a mean fasting glucose of 211 +/- 27 mg/dL and a mean stimulated glucose value of 434 +/- 41 mg/dL for all patients; the mean fasting insulin was 23 +/- 4 microU/mL.(ABSTRACT TRUNCATED AT 400 WORDS) Images FIG. 5. PMID:1632680
Evaluation of Lower East Fork Poplar Creek Mercury Sources - Model Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ketelle, Richard; Brandt, Craig C.; Peterson, Mark J.
The purpose of this report is to assess new data that has become available and provide an update to the evaluations and modeling presented in the Oak Ridge National Laboratory (ORNL) Technical Manuscript Evaluation of lower East Fork Poplar Creek (LEFPC) Mercury Sources (Watson et al., 2016). Primary sources of field and laboratory data for this update include multiple US Department of Energy (DOE) programs including Environmental Management (EM; e.g., Biological Monitoring and Abatement Program, Mercury Remediation Technology Development [TD], and Applied Field Research Initiative), Office of Science (Mercury Science Focus Areas [SFA] project), and the Y-12 National Security Complexmore » (Y-12) Compliance Department.« less
Building America Industrialized Housing Partnership (BAIHP II)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abernethy, Bob; Chandra, Subrato; Baden, Steven
2010-11-30
This report summarizes the work conducted by the Building America Industrialized Housing Partnership (BAIHP - www.baihp.org) during the final budget period (BP5) of our contract, January 1, 2010 to November 30, 2010. Highlights from the four previous budget periods are included for context. BAIHP is led by the Florida Solar Energy Center (FSEC) of the University of Central Florida. With over 50 Industry Partners including factory and site builders, work in BP5 was performed in six tasks areas: Building America System Research Management, Documentation and Technical Support; System Performance Evaluations; Prototype House Evaluations; Initial Community Scale Evaluations; Project Closeout, Finalmore » Review of BA Communities; and Other Research Activities.« less
Integrated Evaluation of Closed Loop Air Revitalization System Components
NASA Technical Reports Server (NTRS)
Murdock, K.
2010-01-01
NASA s vision and mission statements include an emphasis on human exploration of space, which requires environmental control and life support technologies. This Contractor Report (CR) describes the development and evaluation of an Air Revitalization System, modeling and simulation of the components, and integrated hardware testing with the goal of better understanding the inherent capabilities and limitations of this closed loop system. Major components integrated and tested included a 4-Bed Modular Sieve, Mechanical Compressor Engineering Development Unit, Temperature Swing Adsorption Compressor, and a Sabatier Engineering and Development Unit. The requisite methodolgy and technical results are contained in this CR.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schuster, E.G.; Jones, J.G.; Meacham, M.L.
1995-08-01
Presents a guide to operation and interpretation of TSPAS Sale Program (TSPAS SP), a menu-driven computer program that is one of two programs in the Timber Sale Planning and Analysis System. TSPAS SP is intended to help field teams design and evaluate timber sale alternatives. TSPAS SP evaluate current and long-term timber implications along with associated nontimber outputs. Features include multiple entries and products, real value change, and graphical input. Guide includes user instructions, a glossary, a listing of data needs, and an explanation of error messages.
48 CFR 1403.101-70 - Technical evaluators and advisors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical evaluators and advisors. 1403.101-70 Section 1403.101-70 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... resolved with the servicing Ethics Counselor. (c) During the evaluation process, each evaluator and advisor...
Naslund, Thomas C; Becker, Stacey Y
2003-01-01
Evaluation of post-marketing success with the Ancure Endovascular Graft (AEG) was accomplished by review of a multicenter, prospective trial involving 46 centers and 163 patients. A second cohort of patients (n = 350) treated with the AEG under a controlled-use interval prior to the prospective trial was simultaneously evaluated. Technical success in both groups of patients (96.9% and 97.4%, respectively) was similar to what was reported in pre-market clinical trials. Operative implantation complications unique to the AEG included graft limb stenosis/occlusion in 35.6 and 31.4%, contralateral pull wire being caught on hooks in 33.7 and 28%, failure to seal (type I endoleak) in 17.2 and 18.3%, jacket guard being stuck in 12.9 and 11%, contralateral wire being stuck in 6.8 and 7.1%, high jacket retraction force in 16 and 8.5%, and inability to retract jacket in 1.8 and 0.5% of patients involved in the multicenter trial and controlled-use interval, respectively. One of four patients undergoing conversion in the prospective trial had graft misdeployment as a mode of failure. Three were converted for access failure. The 30-day mortality rate in the prospective trial was 3.7%. Interventions to resolve implantation-related events included stenting, guide catheter manipulations, wire exchanges, and delivery catheter disassembly. These interventions were successful in virtually every case. Open surgical procedures were not needed to correct these operative problems. Results from this study demonstrate excellent technical success with the AEG in the post-market era. Interventions to resolve implantation complications, when utilized, are highly successful in facilitating AEG implantation and providing technical success.
Parlak, Erkan; Koksal, Aydin Seref; Eminler, Ahmet Tarik; Toka, Bilal; Uslan, Mustafa Ihsan
2017-08-01
Fully covered self-expandable metal stents (Fc-SEMSs) have a challenging use in the treatment of anastomosis strictures after live donor liver transplantation (LDLT) because they can occlude secondary branch biliary ducts when placed above the biliary bifurcation. In this study, we evaluated the technical feasibility and safety of combining Fc-SEMSs with plastic stent(s) inserted to the secondary branch biliary ducts for the treatment of anastomosis stricture after LDLT. The study group included 22 patients (12 men, aged 51±11 years) with anastomotic biliary stricture after LDLT. A Fc-SEMS, 8 to 10 mm in diameter, was inserted to the straight, dilated main duct and plastic stent(s) were inserted to the secondary branches to avoid their occlusion. Stents were left in place for 2 months and removed with a stent retrieving forceps. Technical feasibilities, including technical success, successful removal, and adverse events of this novel strategy, were evaluated. Fc-SEMSs were successfuly deployed and removed in all of the cases. Three (13.6%) patients had pain requiring intravenous analgesia and Fc-SEMS had to be removed because of unbearable pain in one of them. Three (13.6%) patients developed cholangitis due to occlusion of unrecognized secondary branch biliary ducts. Primary stricture resolution rate was achieved in 17 (89.5%) of 19 patients. Recurrence was observed in 3 (17.6%) patients after a mean follow-up duration of 154.3±52.6 (range, 104-304) days. Combination of Fc-SEMS and plastic stent(s) is technically feasible and safe for the treatment of anastomotic biliary strictures after LDLT.
Yusof, Maryati Mohd
2015-07-01
Clinical information systems have long been used in intensive care units but reports on their adoption and benefits are limited. This study evaluated a Critical Care Information System implementation. A case study summative evaluation was conducted, employing observation, interview, and document analysis in operating theatres and 16-bed adult intensive care units in a 400-bed Malaysian tertiary referral centre from the perspectives of users (nurses and physicians), management, and information technology staff. System implementation, factors influencing adoption, fit between these factors, and the impact of the Critical Care Information System were evaluated after eight months of operation. Positive influences on system adoption were associated with technical factors, including system ease of use, usefulness, and information relevancy; human factors, particularly user attitude; and organisational factors, namely clinical process-technology alignment and champions. Organisational factors such as planning, project management, training, technology support, turnover rate, clinical workload, and communication were barriers to system implementation and use. Recommendations to improve the current system problems were discussed. Most nursing staff positively perceived the system's reduction of documentation and data access time, giving them more time with patients. System acceptance varied among doctors. System use also had positive impacts on timesaving, data quality, and clinical workflow. Critical Care Information Systems is crucial and has great potentials in enhancing and delivering critical care. However, the case study findings showed that the system faced complex challenges and was underutilised despite its potential. The role of socio-technical factors and their fit in realizing the potential of Critical Care Information Systems requires continuous, in-depth evaluation and stakeholder understanding and acknowledgement. The comprehensive and specific evaluation measures of the Human-Organisation-Technology Fit framework can flexibly evaluate Critical Care Information Systems. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.
Advanced Exploration Systems Atmosphere Resource Recovery and Environmental Monitoring
NASA Technical Reports Server (NTRS)
Perry, J.; Abney, M.; Conrad, R.; Garber, A.; Howard, D.; Kayatin, M.; Knox, J.; Newton, R.; Parrish, K.; Roman, M.;
2016-01-01
In September 2011, the Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project was commissioned by NASA's Advanced Exploration Systems program to advance Atmosphere Revitalization Subsystem (ARS) and Environmental Monitoring Subsystem (EMS) technologies for enabling future crewed space exploration missions beyond low Earth orbit. The ARREM project's period of performance covered U.S. Government fiscal years 2012-2014. The ARREM project critically assessed the International Space Station (ISS) ARS and EMS architectures and process technologies as the foundation for an architecture suitable for deep space exploration vehicles. The project's technical content included technical tasks focused on improving the reliability and life cycle cost of ARS and EMS technologies as well as reducing future flight project developmental risk and design, development, test, and evaluation costs. Targeted technology development and maturation tasks, including key technical trade assessments, were accomplished and integrated ARS architectures were demonstrated. The ARREM project developed, demonstrated, and tested leading process technology candidates and subsystem architectures that met or exceeded key figures of merit, addressed capability gaps, and significantly improved the efficiency, safety, and reliability over the state-of-the-art ISS figures of merit. Promising EMS instruments were developed and functionally demonstrated in a simulated cabin environment. The project's technical approach and results are described and recommendations for continued development are provided.
Integrating Technical Communication in the Mechanical Engineering Curriculum
NASA Astrophysics Data System (ADS)
Norberg, Seth; Ashcraft, Timothy; van Poppel, Bret
2017-11-01
Technical communication is essential to engineering practice, but these skills can be challenging to teach and assess in the classroom. Instructors in the Mechanical Engineering (ME) program at the United States Military Academy are developing new learning exercises to prepare students for success in their capstone design course and beyond. In this paper we highlight the recent successes and lessons learned from two courses: junior-level Thermal-Fluid Systems and the senior-level ME Seminar. Both courses support the newly implemented West Point Writing Program (WPWP), an institutional, writing-across-the-curriculum program. The junior course incorporates four hands-on experiments, which provide an abundance of data for students to analyze, assess, and present. In the senior course the majority of the content that students present is from their ongoing capstone design projects. Between the two courses, students craft essays, lab reports, short summaries, posters, quad charts, and technical presentations. Both courses include peer evaluation, revision exercises, and timed (on demand) writing assignments. The junior course includes assignments co-authored by a group as well as an individual report. An overview of both courses' assignments with course-end feedback from the students and the faculty is provided. Strengths and weaknesses are identified and recommendations for instructors seeking to implement similar technical communications assignments in their own courses are presented.
NASA Technical Reports Server (NTRS)
Mccullough, R. A.; Pinelli, T. E.; Pilley, D. D.; Stohrer, F. F.
1982-01-01
Current practice and usage using selected technical reports; literature relative to the sequential, language, and presentation components of technical reports; and NASA technical report publications standards are discussed. The effctiveness of the technical report as a product for information dissemination is considered.
Analysis and assessment of STES technologies
NASA Astrophysics Data System (ADS)
Brown, D. R.; Blahnik, D. E.; Huber, H. D.
1982-12-01
Technical and economic assessments completed in FY 1982 in support of the Seasonal Thermal Energy Storage (STES) segment of the Underground Energy Storage Program included: (1) a detailed economic investigation of the cost of heat storage in aquifers, (2) documentation for AQUASTOR, a computer model for analyzing aquifer thermal energy storage (ATES) coupled with district heating or cooling, and (3) a technical and economic evaluation of several ice storage concepts. This paper summarizes the research efforts and main results of each of these three activities. In addition, a detailed economic investigation of the cost of chill storage in aquifers is currently in progress. The work parallels that done for ATES heat storage with technical and economic assumptions being varied in a parametric analysis of the cost of ATES delivered chill. The computer model AQUASTOR is the principal analytical tool being employed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Evaluation; Medicare Program; Meeting of the Technical Advisory Panel on Medicare Trustee Reports AGENCY... announces a public meeting of the Technical Advisory Panel on Medicare Trustee Reports (Panel). Notice of... long run. The Panel's discussion is expected to be very technical in nature and will focus on the...
Emery, James; Crump, Carolyn; Hawkins, Margaret
2007-10-01
AARP conducted a 2.5-year social-marketing campaign to improve physical activity levels among older adults in Richmond, Virginia and Madison, Wisconsin. This article presents formative evaluation findings from the campaign's policy/environmental change component. Evaluation data were abstracted from technical-assistance documentation and telephone interviews. Results include 11 policy and 14 environmental changes attained or in-process by campaign closure. Differences between the cities' results are explained through differences in program implementation (e.g., types of changes planned, formalization of partnerships). Project teams took less time deciding to pursue policy change than environmental change; however, planning the policy activities took longer than planning environmental-change activities. Recommendations for future policy/environmental change interventions focus on the selection of strategies; planning for administrative resources; formalizing partnerships to ensure sustainability of impact; ensuring training and technical assistance; and documenting progress. Similar intervention results may be attainable with a multi-year timeframe, adequate part-time coordination, and committed volunteers.
de Montbrun, Sandra L; Roberts, Patricia L; Lowry, Ann C; Ault, Glenn T; Burnstein, Marcus J; Cataldo, Peter A; Dozois, Eric J; Dunn, Gary D; Fleshman, James; Isenberg, Gerald A; Mahmoud, Najjia N; Reznick, Richard K; Satterthwaite, Lisa; Schoetz, David; Trudel, Judith L; Weiss, Eric G; Wexner, Steven D; MacRae, Helen
2013-12-01
To develop and evaluate an objective method of technical skills assessment for graduating subspecialists in colorectal (CR) surgery-the Colorectal Objective Structured Assessment of Technical Skill (COSATS). It may be reasonable for the public to assume that surgeons certified as competent have had their technical skills assessed. However, technical skill, despite being the hallmark of a surgeon, is not directly assessed at the time of certification by surgical boards. A procedure-based, multistation technical skills examination was developed to reflect a sample of the range of skills necessary for CR surgical practice. These consisted of bench, virtual reality, and cadaveric models. Reliability and construct validity were evaluated by comparing 10 graduating CR residents with 10 graduating general surgery (GS) residents from across North America. Expert CR surgeons, blinded to level of training, evaluated performance using a task-specific checklist and a global rating scale. The mean global rating score was used as the overall examination score and a passing score was set at "borderline competent for CR practice." The global rating scale demonstrated acceptable interstation reliability (0.69) for a homogeneous group of examinees. Both the overall checklist and global rating scores effectively discriminated between CR and GS residents (P < 0.01), with 27% of the variance attributed to level of training. Nine CR residents but only 3 GS residents were deemed competent. The Colorectal Objective Structured Assessment of Technical Skill effectively discriminated between CR and GS residents. With further validation, the Colorectal Objective Structured Assessment of Technical Skill could be incorporated into the colorectal board examination where it would be the first attempt of a surgical specialty to formally assess technical skill at the time of certification.
Performance evaluation approach for the supercritical helium cold circulators of ITER
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaghela, H.; Sarkar, B.; Bhattacharya, R.
2014-01-29
The ITER project design foresees Supercritical Helium (SHe) forced flow cooling for the main cryogenic components, namely, the superconducting (SC) magnets and cryopumps (CP). Therefore, cold circulators have been selected to provide the required SHe mass flow rate to cope with specific operating conditions and technical requirements. Considering the availability impacts of such machines, it has been decided to perform evaluation tests of the cold circulators at operating conditions prior to the series production in order to minimize the project technical risks. A proposal has been conceptualized, evaluated and simulated to perform representative tests of the full scale SHe coldmore » circulators. The objectives of the performance tests include the validation of normal operating condition, transient and off-design operating modes as well as the efficiency measurement. A suitable process and instrumentation diagram of the test valve box (TVB) has been developed to implement the tests at the required thermodynamic conditions. The conceptual engineering design of the TVB has been developed along with the required thermal analysis for the normal operating conditions to support the performance evaluation of the SHe cold circulator.« less
Markar, Sheraz R; Arya, Shobhit; Karthikesalingam, Alan; Hanna, George B
2013-12-01
Due to the significant contribution of anastomotic leak, with its disastrous consequences to patient morbidity and mortality, multiple parameters have been proposed and individually meta-analyzed for the formation of the ideal esophagogastric anastomosis following cancer resection. The purpose of this pooled analysis was to examine the main technical parameters that impact on anastomotic integrity. Medline, Embase, trial registries, and conference proceedings were searched. Technical factors evaluated included hand-sewn versus stapled esophagogastric anastomosis (EGA), cervical versus thoracic EGA, minimally invasive versus open esophagectomy, anterior versus posterior route of reconstruction and ischemic conditioning of the gastric conduit. The outcome of interest was the incidence of anastomotic leak, for which pooled odds ratios were calculated for each technical factor. No significant difference in the incidence of anastomotic leak was demonstrated for the following technical factors: hand-sewn versus stapled EGA, minimally invasive versus open esophagectomy, anterior versus posterior route of reconstruction and ischemic conditioning of the gastric conduit. Four randomized, controlled trials comprising 298 patients were included that compared cervical and thoracic EGA. Anastomotic leak was seen more commonly in the cervical group (13.64 %) than in the thoracic group (2.96 %). Pooled analysis demonstrated a significantly increased incidence of anastomotic leak in the cervical group (pooled odds ratio = 4.73; 95 % CI 1.61-13.9; P = 0.005). A tailored surgical approach to the patient's physiology and esophageal cancer stage is the most important factor that influences anastomotic integrity after esophagectomy.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... information, including definitions. Chapter T2 contains scoping requirements that specify what vehicle... technical requirements for those vehicles will be added to Chapters T2 through T8. Each chapter is arranged... Development and Evaluation of Countermeasures,'' Report No. FHWA-RD-79-3 Prepared for the Federal Highway...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-19
... performing the technical analysis, management assessment, and program evaluation tasks required to address... premarket reviews that meet regulatory review standards. 2. Analysis of elements of the review process... process. This includes analysis of root causes for inefficiencies that may affect review performance and...
NASA Technical Reports Server (NTRS)
1976-01-01
The engineering analyses and evaluation studies conducted for the Software Requirements Analysis are discussed. Included are the development of the study data base, synthesis of implementation approaches for software required by both mandatory onboard computer services and command/control functions, and identification and implementation of software for ground processing activities.
ERIC Educational Resources Information Center
Southern Rural Development Center, State College, MS.
Included in this second annual report on the Southern Rural Development Center's (SRDC) 1974-75 plan of work are data re: orientation visits; regional workshops; technical consultants; liaison with regional agencies and organizations; information dissemination; annual evaluation; functional networks in the areas of land use issues, citizen…
Air Pollution Technology: A Suggested Two-Year Post High School Curriculum.
ERIC Educational Resources Information Center
Santa Fe Community Coll., Gainesville, FL.
The purpose of this guide is to help school administrators and instructors in planning and developing new programs in the air pollution control field, or in evaluating those in existence. It contains course outlines for technical specialization courses as well as necessary basic science and communication courses. Also included are plans for…
Program-Wide Positive Behavioral Interventions and Supports in Rural Preschools
ERIC Educational Resources Information Center
Steed, Elizabeth A.; Pomerleau, Tina; Muscott, Howard; Rohde, Leigh
2013-01-01
This article describes the quantitative findings from an evaluation of program-wide positive behavioral interventions and supports (PBIS) in three rural preschool programs. Each rural preschool program included children 3 through 5 years of age with and without disabilities. Following 3 years of on-site training, technical assistance, and coaching…
A Survey on the Use of Microcomputers in Special Libraries.
ERIC Educational Resources Information Center
Krieger, Tillie
1986-01-01
Describes a survey on the use of microcomputers in special libraries. The discussion of the findings includes types of hardware and software in use; applications in public services, technical processes, and administrative tasks; data back-up techniques; training received; evaluation of software; and future plans for microcomputer applications. (1…
A Guide to the Selection of Cost-Effective Wastewater Treatment Systems. Technical Report.
ERIC Educational Resources Information Center
Van Note, Robert H.; And Others
The data within this publication provide guidelines for planners, engineers and decision-makers at all governmental levels to evaluate cost-effectiveness of alternative wastewater treatment proposals. The processes described include conventional and advanced treatment units as well as most sludge handling and processing units. Flow sheets, cost…
ERIC Educational Resources Information Center
Hartman, Rhona C.; Redden, Martha Ross
This fact sheet provides guidelines on adapting testing situations for disabled postsecondary students. Discussed in the first section are considerations in determining when testing adaptations are needed including disability verification procedures, policy consistency, and maintenance of academic and technical standards. Facts about disabilities…
Item-Level and Construct Evaluation of Early Numeracy Curriculum-Based Measures
ERIC Educational Resources Information Center
Lee, Young-Sun; Lembke, Erica; Moore, Douglas; Ginsburg, Herbert P.; Pappas, Sandra
2012-01-01
The present study examined the technical adequacy of curriculum-based measures (CBMs) of early numeracy. Six 1-min early mathematics tasks were administered to 137 kindergarten and first-grade students, along with an omnibus test of early mathematics. The CBM measures included Count Out Loud, Quantity Discrimination, Number Identification, Missing…
ERIC Educational Resources Information Center
Jones, Earl I., Ed.
This five-section symposium report includes 22 papers assessing the state-of-the-art in occupational research. Section 1, Occupational Analysis, Structure, and Methods, contains four papers that discuss: the Air Force Occupational Research project, methodologies in job analysis, evaluation, structures and requirements, career development,…
Annual Evaluation of Vocational-Technical Education in American Samoa. 1975.
ERIC Educational Resources Information Center
American Samoa Advisory Council on Vocational Education, Pago Pago.
Activities of the American Samoa Advisory Council on Vocational Education upon which the annual report is based include observations, participation in conferences and workshops on education and training, review of reports from educational and manpower agencies, results of special studies, and review of the State plan for vocational education. The…
5th Conference on Aerospace Materials, Processes, and Environmental Technology
NASA Technical Reports Server (NTRS)
Cook, M. B. (Editor); Stanley, D. Cross (Editor)
2003-01-01
Records are presented from the 5th Conference on Aerospace Materials, Processes, and Environmental Technology. Topics included pollution prevention, inspection methods, advanced materials, aerospace materials and technical standards,materials testing and evaluation, advanced manufacturing,development in metallic processes, synthesis of nanomaterials, composite cryotank processing, environmentally friendly cleaning, and poster sessions.
Design and User Evaluation of a Mobile Application to Teach Chinese Characters
ERIC Educational Resources Information Center
Rosell-Aguilar, Fernando; Qian, Kan
2015-01-01
This paper presents both the pedagogical design principles and the challenges faced during the development of a mobile app, Chinese Characters First Steps, to support recognising, learning and practising writing Chinese characters at beginners' level, including the difficult balance between pedagogy and technical affordances. We also present the…
Apollo experience report: The AN/ARD-17 direction finding system
NASA Technical Reports Server (NTRS)
Chase, W. R.; Middleton, W. A.
1975-01-01
This report contains a statement of the operational philosophy and requirements leading to the development of the AN/ARD-17 direction-finding system. The technical problems encountered and the solutions devised in the AN/ARD-17 development are discussed. An evaluation of the system under actual operational conditions is included.
77 FR 23224 - Request for Technical Input-Standards in Trade Workshops
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-18
... Institute of Standards and Technology (NIST) invites all interested parties, including U.S.-based... the current National Export Strategy. NIST will offer a limited number of workshops each year. Most workshops will be scheduled for a 3 to 5 day period at NIST in Gaithersburg, Maryland. NIST will evaluate...
A Bayesian Method for Evaluating Trainee Proficiency. Technical Paper 323.
ERIC Educational Resources Information Center
Epstein, Kenneth I.; Steinheiser, Frederick H., Jr.
A multiparameter, programmable model was developed to examine the interactive influence of certain parameters on the probability of deciding that an examinee had attained a specified degree of mastery. It was applied within the simulated context of performance testing of military trainees. These parameters included: (1) the number of assumed…
Transcatheter Arterial Embolization of Intramuscular Active Hemorrhage with N-Butyl Cyanoacrylate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoo, Dong Hyun; Jae, Hwan Jun, E-mail: jhj@radiol.snu.ac.kr; Kim, Hyo-Cheol
Purpose: This study was designed to evaluate the clinical efficacy and safety of transcatheter arterial embolization (TAE) with n-butyl cyanoacrylate (NBCA) for intramuscular active hemorrhage of varied etiologies and anatomic sites. Methods: Eighteen patients who demonstrated hematoma with pseudoaneurysm and/or active extravasation of contrast media underwent TAE with NBCA. Etiologies of hematoma included trauma, postoperative complication, and coagulopathy (due to underlying disease or anticoagulation therapy). Sites of embolization included chest wall, abdomen wall, retroperitoneum, and extremity. TAE was performed by using 1:3 to 1:5 mixtures of NBCA and iodized oil, either solely (n = 15) or in combination with microcoilmore » (n = 3). The technical and clinical success rate, procedure-related complications, and clinical outcomes were evaluated. Results: The technical and clinical success rates were 100% and 83% (15/18), respectively. Two patients expired while admitted due to other comorbidities. One patient expired due to recurrent bleeding at another site. There were no serious complications relating to the embolization procedure. Conclusions: TAE with NBCA is effective and safe treatment modality for intramuscular active hemorrhage.« less
Gas turbine critical research and advanced technology (CRT) support project
NASA Technical Reports Server (NTRS)
Furman, E. R.; Anderson, D. N.; Gedwill, M. A.; Lowell, C. E.; Schultz, D. F.
1982-01-01
The technical progress to provide a critical technology base for utility gas turbine systems capable of burning coal-derived fuels is summarized. Project tasks include the following: (1) combustion - to investigate the combustion of coal-derived fuels and the conversion of fuel-bound nitrogen to NOx; (2) materials - to understand and prevent the hot corrosion of turbine hot section materials; and (3) system studies - to integrate and guide the technological efforts. Technical accomplishments include: an extension of flame tube combustion testing of propane - Toluene Fuel Mixtures to vary H2 content from 9 to 18 percent by weight and the comparison of results with that predicted from a NASA Lewis General Chemical Kinetics Computer Code; the design and fabrication of combustor sector test section to test current and advanced combustor concepts; Testing of Catalytic combustors with residual and coal-derived liquid fuels; testing of high strength super alloys to evaluate their resistance to potential fuel impurities using doped clean fuels and coal-derived liquids; and the testing and evaluation of thermal barrier coatings and bond coatings on conventional turbine materials.
Optimal Corrosion Control Treatment Evaluation Technical Recommendations
This document provides technical recommendations that both systems and primacy agencies can use to comply with LCR CCT requirements and effective evaluation and designation of optimal corrosion control treatment (OCCT).
Integrated Solar Upper Stage Technical Support
NASA Technical Reports Server (NTRS)
Jaworske, Donald A.
1998-01-01
NASA Lewis Research Center is participating in the Integrated Solar Upper Stage (ISUS) program. This program is a ground-based demonstration of an upper stage concept that will be used to generate both solar propulsion and solar power. Solar energy collected by a primary concentrator is directed into the aperture of a secondary concentrator and further concentrated into the aperture of a heat receiver. The energy stored in the receiver-absorber-converter is used to heat hydrogen gas to provide propulsion during the orbital transfer portion of the mission. During the balance of the mission, electric power is generated by thermionic diodes. Several materials issues were addressed as part of the technical support portion of the ISUS program, including: 1) Evaluation of primary concentrator coupons; 2) Evaluation of secondary concentrator coupons; 3) Evaluation of receiver-absorber-converter coupons; 4) Evaluation of in-test witness coupons. Two different types of primary concentrator coupons were evaluated from two different contractors-replicated coupons made from graphite-epoxy composite and coupons made from microsheet glass. Specular reflectivity measurements identified the replicated graphite-epoxy composite coupons as the primary concentrator material of choice. Several different secondary concentrator materials were evaluated, including a variety of silver and rhodium reflectors. The specular reflectivity of these materials was evaluated under vacuum at temperatures up to 800 C. The optical properties of several coupons of rhenium on graphite were evaluated to predict the thermal performance of the receiver-absorber-converter. Finally, during the ground test demonstration, witness coupons placed in strategic locations throughout the thermal vacuum facility were evaluated for contaminants. All testing for the ISUS program was completed successfully in 1997. Investigations related to materials issues have proven helpful in understanding the operation of the test article, leading to a potential ISUS flight test in 2002.
A technical report on structural evaluation of the Meade County reinforced concrete bridge.
DOT National Transportation Integrated Search
2009-01-01
This is a technical report on the first phase of the evaluation of the Meade County reinforced concrete bridge. : The first three chapters introduce the main problem and provide a general review of the existing evaluation : methods and the procedures...
NASA Technical Reports Server (NTRS)
Pinelli, T. E.; Hinnebusch, P. A.; Jaffe, J. M.
1981-01-01
A selected, annotated bibliography of literature citations related to the design and evaluation of STI systems is presented. The use of manual and machine-readable literature searches; the review of numerous books, periodicals reports, and papers; and the selection and annotation of literature citations were required. The bibliography was produced because the information was needed to develop the methodology for the review and evaluation project, and a survey of the literature did not reveal the existence of a single published source of information pertinent to the subject. Approximately 200 citations are classified in four subject areas. The areas include information - general; information systems - design and evaluation, including information products and services; information - use and need; and information - economics.
NASA Technical Reports Server (NTRS)
Pinelli, Thomas E.; Henderson, Madeline; Bishop, Ann P.; Doty, Philip
1992-01-01
The chronology is a comprehensive bibliography. It contains 512 entries covering a variety of selected literature, reports, policy instruments, and significant events affecting Federal Scientific and Technical Information (STI) from 1945 to 1990. It includes some publications and events of historic interest which relate to the evaluation of aerospace and aerospace knowledge diffusion. Each entry has been given an item number and items are arranged by columns. To provide an overview of Federal STI developments, the entries are generally arranged by date of publication and event.
Impact of oscillations of shafts on machining accuracy using non-stationary machines
NASA Astrophysics Data System (ADS)
Fedorenko, M. A.; Bondarenko, J. A.; Pogonin, A. A.
2018-03-01
The solution of the problem of restoring parts and units of equipment of the large mass and size is possible on the basis of the development of the research base, including the development of models and theoretical relations, revealing complex reasons for causes of damage and equipment failure. This allows one to develop new effective technologies of maintenance and repair, implementation of which ensures the efficiency and durability of the machines. The development of new forms of technical maintenance and repair of equipment, based on a systematic evaluation of its technical condition with the help of modern diagnostic tools can significantly reduce the duration of the downtime.
Technical Basis for Electromagnetic Compatibility Regulatory Guidance Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ewing, Paul D.; Korsah, Kofi; Harrison, Thomas J.
2016-03-01
The objective of this report is to serve as the technical basis document for the next, planned revision of this RG that highlights and provides the rationale for the recommended changes. The structure of this document follows and summarizes the several assessment activities undertaken during the course of this project to evaluate new and updated electromagnetic compatibility (EMC) standards, testing methods and limits, and relevant technology developments being incorporated into plant activities that may have EMI/RFI implications, as well as other specific issues, including impacts of electrostatic discharge (ESD) on safety equipment and impacts on increased usage of wireless devicesmore » in nuclear power plants.« less
NASA Technical Reports Server (NTRS)
Kafka, P. G.; Skibo, M. A.; White, J. L.
1977-01-01
The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.
Ares I-X Flight Data Evaluation: Executive Overview
NASA Technical Reports Server (NTRS)
Huebner, Lawrence D.; Waits, David A.; Lewis, Donny L.; Richards, James S.; Coates, R. H., Jr.; Cruit, Wendy D.; Bolte, Elizabeth J.; Bangham, Michal E.; Askins, Bruce R.; Trausch, Ann N.
2011-01-01
NASA's Constellation Program (CxP) successfully launched the Ares I-X flight test vehicle on October 28, 2009. The Ares I-X flight was a developmental flight test to demonstrate that this very large, long, and slender vehicle could be controlled successfully. The flight offered a unique opportunity for early engineering data to influence the design and development of the Ares I crew launch vehicle. As the primary customer for flight data from the Ares I-X mission, the Ares Projects Office (APO) established a set of 33 flight evaluation tasks to correlate flight results with prospective design assumptions and models. The flight evaluation tasks used Ares I-X data to partially validate tools and methodologies in technical disciplines that will ultimately influence the design and development of Ares I and future launch vehicles. Included within these tasks were direct comparisons of flight data with preflight predictions and post-flight assessments utilizing models and processes being applied to design and develop Ares I. The benefits of early development flight testing were made evident by results from these flight evaluation tasks. This overview provides summary information from assessment of the Ares I-X flight test data and represents a small subset of the detailed technical results. The Ares Projects Office published a 1,600-plus-page detailed technical report that documents the full set of results. This detailed report is subject to the International Traffic in Arms Regulations (ITAR) and is available in the Ares Projects Office archives files.
Special environmental control and life support equipment test analyses and hardware
NASA Technical Reports Server (NTRS)
Callahan, David M.
1995-01-01
This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.
NASA Technical Reports Server (NTRS)
Kraft, C. C., Jr.
1977-01-01
A satellite based energy concept is described, including the advantages of the basic concept, system characteristics, cost, and environmental considerations. An outline of a plan for the further evaluation and implementation of the system is given. It is concluded that the satellite concept is competitive with other advanced power generation systems when a variety of factors are considered, including technical feasibility, cost, safety, natural resources, environment, baseload capability, location flexibility, land use, and existing industrial base for implementation.
1988-06-01
petroleum and combustion products. Consequently, the PSDDA list of chemicals of concern includes 16 polynuclear aromatic hydrocarbons (PAHs). Measurement...This material usually includes slurry water. Hydrocarbon . An organic compound composed of carbon and hydrogen. Petroleum and its derived compounds... Hydrocarbons Phthalates Pesticides Miscellaneous Compounds Biological Testing --Amphipod Bioassay Microtox Bioassay Macoma Bioaccumulation Costs for
Advanced Public Transportation Systems. Technical Assistance Brief 2
DOT National Transportation Integrated Search
1993-01-01
The Advanced Public Transportation Systems (APTS) Program requires evaluation : of pilot projects. This technical assistance brief discusses the guidelines set : for developing evaluation framework and methodology for local projects. 4p.
Mauri, Giovanni; Sconfienza, Luca Maria; Pescatori, Lorenzo Carlo; Fedeli, Maria Paola; Alì, Marco; Di Leo, Giovanni; Sardanelli, Francesco
2017-08-01
To systematically review studies concerning imaging-guided minimally-invasive breast cancer treatments. An online database search was performed for English-language articles evaluating percutaneous breast cancer ablation. Pooled data and 95% confidence intervals (CIs) were calculated. Technical success, technique efficacy, minor and major complications were analysed, including ablation technique subgroup analysis and effect of tumour size on outcome. Forty-five studies were analysed, including 1,156 patients and 1,168 lesions. Radiofrequency (n=577; 50%), microwaves (n=78; 7%), laser (n=227; 19%), cryoablation (n=156; 13%) and high-intensity focused ultrasound (HIFU, n=129; 11%) were used. Pooled technical success was 96% (95%CI 94-97%) [laser=98% (95-99%); HIFU=96% (90-98%); radiofrequency=96% (93-97%); cryoablation=95% (90-98%); microwave=93% (81-98%)]. Pooled technique efficacy was 75% (67-81%) [radiofrequency=82% (74-88); cryoablation=75% (51-90); laser=59% (35-79); HIFU=49% (26-74)]. Major complications pooled rate was 6% (4-8). Minor complications pooled rate was 8% (5-13%). Differences between techniques were not significant for technical success (p=0.449), major complications (p=0.181) or minor complications (p=0.762), but significant for technique efficacy (p=0.009). Tumour size did not impact on variables (p>0.142). Imaging-guided percutaneous ablation techniques of breast cancer have a high rate of technical success, while technique efficacy remains suboptimal. Complication rates are relatively low. • Imaging-guided ablation techniques for breast cancer are 96% technically successful. • Overall technique efficacy rate is 75% but largely inhomogeneous among studies. • Overall major and minor complication rates are low (6-8%).
Jorm, Christine; Roberts, Chris; Lim, Renee; Roper, Josephine; Skinner, Clare; Robertson, Jeremy; Gentilcore, Stacey; Osomanski, Adam
2016-03-08
There is little research on large-scale complex health care simulations designed to facilitate student learning of non-technical skills in a team-working environment. We evaluated the acceptability and effectiveness of a novel natural disaster simulation that enabled medical students to demonstrate their achievement of the non-technical skills of collaboration, negotiation and communication. In a mixed methods approach, survey data were available from 117 students and a thematic analysis undertaken of both student qualitative comments and tutor observer participation data. Ninety three per cent of students found the activity engaging for their learning. Three themes emerged from the qualitative data: the impact of fidelity on student learning, reflexivity on the importance of non-technical skills in clinical care, and opportunities for collaborative teamwork. Physical fidelity was sufficient for good levels of student engagement, as was sociological fidelity. We demonstrated the effectiveness of the simulation in allowing students to reflect upon and evidence their acquisition of skills in collaboration, negotiation and communication, as well as situational awareness and attending to their emotions. Students readily identified emerging learning opportunities though critical reflection. The scenarios challenged students to work together collaboratively to solve clinical problems, using a range of resources including interacting with clinical experts. A large class teaching activity, framed as a simulation of a natural disaster is an acceptable and effective activity for medical students to develop the non-technical skills of collaboration, negotiation and communication, which are essential to team working. The design could be of value in medical schools in disaster prone areas, including within low resource countries, and as a feasible intervention for learning the non-technical skills that are needed for patient safety.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2010 CFR
2010-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...
Park, Jung-Hoon; Kim, Pyeong Hwa; Shin, Ji Hoon; Tsauo, Jiaywei; Kim, Min Tae; Cho, Young Chul; Kim, Jin Hyoung; Song, Ho-Young
2016-11-01
The purpose of the study was to retrospectively evaluate the technical outcomes of removal of retrievable self-expandable metallic stents (REMSs) and identify predictors of technical failure in 81 patients with benign and malignant tracheobronchial strictures. A total of 98 REMSs were removed under fluoroscopic guidance in 81 patients with benign (n = 48) or malignant (n = 33) tracheobronchial strictures. Primary and secondary technical success rates and complication rate were evaluated. Technical outcomes with regard to underlying diseases were also evaluated. Logistic regression models were constructed to identify predictors of primary technical success. Primary and secondary technical success rates were 86.7 and 94.9 %, respectively. Stent removal-related complication rate was 7.1 % (7/98) and all were bleeding after stent removal. All bleeding complications were minor and managed conservatively. Primary technical success rate for benign strictures was significantly lower compared with that for malignant strictures (80.9 vs. 97.1 %, P = 0.029), but secondary technical success rate (93.7 vs. 97.1 %, P = 0.652) did not differ between the two groups. Granulation tissue formation was identified as an independent predictor of primary technical success (odds ratio 0.249, 95 % CI 0.071-0.874, P = 0.030). Removal of REMSs in patients with benign and malignant tracheobronchial strictures is safe and technically feasible. Bronchoscopic guidance may be required when the removal using a hook wire fails. The presence of granulation tissue was the negative predictor of primary technical success.
Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reportsmore » to the NRC`s Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission.« less
Multi-criteria evaluation of wastewater treatment plant control strategies under uncertainty.
Flores-Alsina, Xavier; Rodríguez-Roda, Ignasi; Sin, Gürkan; Gernaey, Krist V
2008-11-01
The evaluation of activated sludge control strategies in wastewater treatment plants (WWTP) via mathematical modelling is a complex activity because several objectives; e.g. economic, environmental, technical and legal; must be taken into account at the same time, i.e. the evaluation of the alternatives is a multi-criteria problem. Activated sludge models are not well characterized and some of the parameters can present uncertainty, e.g. the influent fractions arriving to the facility and the effect of either temperature or toxic compounds on the kinetic parameters, having a strong influence in the model predictions used during the evaluation of the alternatives and affecting the resulting rank of preferences. Using a simplified version of the IWA Benchmark Simulation Model No. 2 as a case study, this article shows the variations in the decision making when the uncertainty in activated sludge model (ASM) parameters is either included or not during the evaluation of WWTP control strategies. This paper comprises two main sections. Firstly, there is the evaluation of six WWTP control strategies using multi-criteria decision analysis setting the ASM parameters at their default value. In the following section, the uncertainty is introduced, i.e. input uncertainty, which is characterized by probability distribution functions based on the available process knowledge. Next, Monte Carlo simulations are run to propagate input through the model and affect the different outcomes. Thus (i) the variation in the overall degree of satisfaction of the control objectives for the generated WWTP control strategies is quantified, (ii) the contributions of environmental, legal, technical and economic objectives to the existing variance are identified and finally (iii) the influence of the relative importance of the control objectives during the selection of alternatives is analyzed. The results show that the control strategies with an external carbon source reduce the output uncertainty in the criteria used to quantify the degree of satisfaction of environmental, technical and legal objectives, but increasing the economical costs and their variability as a trade-off. Also, it is shown how a preliminary selected alternative with cascade ammonium controller becomes less desirable when input uncertainty is included, having simpler alternatives more chance of success.
NASA Technical Reports Server (NTRS)
Sherwood, Brent; McCleese, Daniel J.
2012-01-01
NASA supports the community of mission principal investigators by helping them ideate, mature, and propose concepts for new missions. As NASA's Federally Funded Research and Development Center (FFRDC), JPL is a primary resource for providing this service. The environmental context for the formulation lifecycle evolves continuously. Contemporary trends include: more competitors; more-complex mission ideas; scarcer formulation resources; and higher standards for technical evaluation. Derived requirements for formulation support include: stable, clear, reliable methods tailored for each stage of the formulation lifecycle; on-demand access to standout technical and programmatic subject-matter experts; optimized, outfitted facilities; smart access to learning embodied in a vast oeuvre of prior formulation work; hands-on method coaching. JPL has retooled its provision of integrated formulation lifecycle support to PIs, teams, and program offices in response to this need. This mission formulation enterprise is the JPL Innovation Foundry.
Can You Increase Teacher Engagement with Evaluation Simply by Improving the Evaluation System?
ERIC Educational Resources Information Center
Moskal, Adon C. M.; Stein, Sarah J.; Golding, Clinton
2016-01-01
We know various factors can influence how teaching staff engage with student evaluation, such as institutional policies or staff beliefs. However, little research has investigated the influence of the technical processes of an evaluation system. In this article, we present a case study of the effects of changing the technical system for…
FY 1989 scientific and technical reports, articles, papers, and presentations
NASA Technical Reports Server (NTRS)
Turner, Joyce E. (Compiler)
1989-01-01
A compendium of bibliographic references to papers presented by Marshall Space Flight Center (MSFC) personnel and contractors during FY 1989 is provided. The papers include formal NASA technical reports, memoranda, papers which were published in technical journals, and presentations by MSFC personnel. The formal NASA technical reports and memoranda have abstracts included. Sources for obtaining these documents are also included.
Chemical vapor deposition growth
NASA Technical Reports Server (NTRS)
Ruth, R. P.; Manasevit, H. M.; Campbell, A. G.; Johnson, R. E.; Kenty, J. L.; Moudy, L. A.; Shaw, G. L.; Simpson, W. I.; Yang, J. J.
1978-01-01
The objective was to investigate and develop chemical vapor deposition (CVD) techniques for the growth of large areas of Si sheet on inexpensive substrate materials, with resulting sheet properties suitable for fabricating solar cells that would meet the technical goals of the Low Cost Silicon Solar Array Project. The program involved six main technical tasks: (1) modification and test of an existing vertical-chamber CVD reactor system; (2) identification and/or development of suitable inexpensive substrate materials; (3) experimental investigation of CVD process parameters using various candidate substrate materials; (4) preparation of Si sheet samples for various special studies, including solar cell fabrication; (5) evaluation of the properties of the Si sheet material produced by the CVD process; and (6) fabrication and evaluation of experimental solar cell structures, using impurity diffusion and other standard and near-standard processing techniques supplemented late in the program by the in situ CVD growth of n(+)/p/p(+) sheet structures subsequently processed into experimental cells.
NASA Technical Reports Server (NTRS)
Wilkinson, W. H.; Kirkhart, F. P.; Kistler, C. W.; Duckworth, W. H.; Ungar, E. W.; Foster, E. L.
1970-01-01
Technical problems of design and flight qualification of the proposed classes of surface insulation materials and leading edge materials were reviewed. A screening test plan, a preliminary design data test plan and a design data test plan were outlined. This program defined the apparent critical differences between the surface insulators and the leading edge materials, structuring specialized screening test plans for each of these two classes of materials. Unique testing techniques were shown to be important in evaluating the structural interaction aspects of the surface insulators and a separate task was defined to validate the test plan. In addition, a compilation was made of available information on proposed material (including metallic TPS), previous shuttle programs, pertinent test procedures, and other national programs of merit. This material was collected and summarized in an informally structured workbook.
Some aspects of strategies and solutions in accident prevention.
Häkkinen, K
1983-04-01
Accident prevention measures are traditionally classified into technical, organizational and behavioral solutions. A review of some commonly used strategies for accident prevention illustrates some discrepancies between different approaches and the need to develop more comprehensive strategies. Several factors, including protective efficiency and disadvantages at work, must be taken into account when the solutions are evaluated. Some solutions to prevent load disengagement from cranes were evaluated. Measurements of the pressing force showed that the efficiency of the safety latch of a clamp for plate lifting is inadequate to provide protection under all exceptional lifting conditions and in all situations for which the safety latch is intended. The delay caused by the attachment of a lifting hook equipped with a safety latch was measured. The handling of some of the most reliable and technically safe latches requires additional operations and thereby limits their practical application.
Hasler, B; Delabouglise, A; Babo Martins, S
2017-04-01
The primary role of animal health economics is to inform decision-making by determining optimal investments for animal health. Animal health surveillance produces information to guide interventions. Consequently, investments in surveillance and intervention must be evaluated together. This article explores the different theoretical frameworks and methods developed to assess and optimise the spending of resources in surveillance and intervention and their technical interdependence. The authors present frameworks that define the relationship between health investment and losses due to disease, and the relationship between surveillance and intervention resources. Surveillance and intervention are usually considered as technical substitutes, since increased investments in surveillance reduce the level of intervention resources required to reach the same benefit. The authors also discuss approaches used to quantify externalities and non-monetary impacts. Finally, they describe common economic evaluation types, including optimisation, acceptability and least-cost studies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rizzo, Davinia; Blackburn, Mark
Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper coversmore » the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, G.D.; Kukielka, C.A.; Olson, L.M.
The engineering analysis group is responsible for all nuclear plant systems analysis and reactor analysis activities, excluding fuel management analysis, at Pennsylvania Power and Light Company. These activities include making pretest and posttest predictions of startup tests; analyzing unplanned or unexpected transient events; providing technical training to plant personnel; assisting in the development of emergency drill scenarios; providing engineering evaluations to support design and technical specification changes, and evaluating, assessing, and resolving a number of license conditions. Many of these activities have required the direct use of RETRAN models. Two RETRAN analyses that were completed to support plant operations -more » a pretest analysis of the turbine trip startup test, and a posttest analysis of the loss of startup transformer event - are investigated. For each case, RETRAN results are compared with available plant data and comparisons are drawn on the acceptability of the performance of the plant systems.« less
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
Evaluation and treatment of failed shoulder instability procedures.
Ho, Anthony G; Gowda, Ashok L; Michael Wiater, J
2016-09-01
Management of the unstable shoulder after a failed stabilization procedure can be difficult and challenging. Detailed understanding of the native shoulder anatomy, including its static and dynamic restraints, is necessary for determining the patient's primary pathology. In addition, evaluation of the patient's history, physical exam, and imaging is important for identifying the cause for failure after the initial procedure. Common mistakes include under-appreciation of bony defects, failure to recognize capsular laxity, technical errors, and missed associated pathology. Many potential treatment options exist for revision surgery, including open or arthroscopic Bankart repair, bony augmentation procedures, and management of Hill Sachs defects. The aim of this narrative review is to discuss in-depth the common risk factors for post-surgical failure, components for appropriate evaluation, and the different surgical options available for revision stabilization. Level of evidence Level V.
48 CFR 1352.215-75 - Evaluation criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Evaluation Factors. Factor 1—TECHNICAL APPROACH. The proposal will be evaluated on how the offeror intends to... as an example only.] In determining which proposal provides the best value to the Government, non... integrated assessment of the technical and cost/price proposals, the Government may make an award to other...
A Technical Evaluation of the First Stage of the Mediterranean Regional Project.
ERIC Educational Resources Information Center
Hollister, Robinson
Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…
ERIC Educational Resources Information Center
Chase, Shirley A.; And Others
A project was conducted to design a system for evaluating microcomputer courseware for vocational and technical education. Through a literature review and contacts with organizations and individuals involved in courseware evaluation and use, project staff identified and acquired for review documents pertaining to courseware evaulation, vocational…
The Changing Nature of Technical Assistance.
ERIC Educational Resources Information Center
Noggle, Nelson L.
The changing nature of technical assistance activities and evaluation for compensatory education programs was discussed. The emphasis is on the Education Consolidation and Improvement Act (ECIA) Chapter 1 Technical Assistance Centers (TAC) and their clients. Improvement of school practices demands that the technical assistance process be developed…
Has competition increased hospital technical efficiency?
Lee, Keon-Hyung; Park, Jungwon; Lim, Seunghoo; Park, Sang-Chul
2015-01-01
Hospital competition and managed care have affected the hospital industry in various ways including technical efficiency. Hospital efficiency has become an important topic, and it is important to properly measure hospital efficiency in order to evaluate the impact of policies on the hospital industry. The primary independent variable is hospital competition. By using the 2001-2004 inpatient discharge data from Florida, we calculate the degree of hospital competition in Florida for 4 years. Hospital efficiency scores are developed using the Data Envelopment Analysis and by using the selected input and output variables from the American Hospital Association's Annual Survey of Hospitals for those acute care general hospitals in Florida. By using the hospital efficiency score as a dependent variable, we analyze the effects of hospital competition on hospital efficiency from 2001 to 2004 and find that when a hospital was located in a less competitive market in 2003, its technical efficiency score was lower than those in a more competitive market.
Technology assessment for an integrated PC-based platform for three telemedicine applications
NASA Astrophysics Data System (ADS)
Tohme, Walid G.; Hayes, Wendelin S.; Dai, Hailei L.; Komo, Darmadi; Pahira, John J.; Abernethy, Darrell R.; Rennert, Wolfgang; Kuehl, Karen S.; Hauser, Gabriel J.; Mun, Seong K.
1996-05-01
This paper investigates the design and technical efficacy of an integrated PC based platform for three different medical applications. The technical efficacy of such a telemedicine platform has not been evaluated in the literature and optimal technical requirements have not been developed. The first application, with the Department of Surgery, Division of Urology, tests the utility of a telemedicine platform including radiology images for a surgical stone disease consultation service from an off site location in West Virginia. The second application, with the Department of Internal Medicine, Division of Clinical Pharmacology, investigates the usefulness of telemedicine when used for a clinical pharmacology consultation service from an off-site location. The third application, with the Department of Pediatrics, will test telemedicine for trauma care triage service first within an off-site location in Virginia and then from there to Georgetown University Medical Center.
Productivity in using school's resources: A case study of secondary school in Dumai, Riau Indonesia
NASA Astrophysics Data System (ADS)
Rozamuri, Arif Murti; Suradi, Nur Riza Mohd
2015-09-01
Definition of good school's differs for every individual. The performance of the school's has always been an interesting discussion topic. This situation requires parents to be more selective for choosing the best school's for their child, especially in the efficient management of resources. This study evaluated changes in total productivity, technology, technical efficiency, and scale efficiency among 12 school of Dumai City in Riau Indonesia using DEA Malmquist Index. The inputs include number of teacher's, number of students, and number of classrooms while output is the number of students that passed the national examination. The results show that average efficiency of secondary school in Dumai City from 2011 to 2013 recorded good changes in terms of technical efficiency, pure technical efficiency and scale efficiency. However, technological and total factor productivity change do not show a positive change.
Planning, evaluation and analytical studies in planetary quarantine and spacecraft sterilization
NASA Technical Reports Server (NTRS)
1972-01-01
The technical and analytical support used to aid in developing requirements for planetary quarantine are presented. The investigation was divided into 8 work tasks which are presented in tabular form. Data include methods of sterilization, safety margins for quarantine, revision of contamination logs for Mars and Venus, and estimates of encapsulated and 'free' microbial burden.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... investigating and evaluating all technical and marketplace factors that may have a bearing on the value of the... cooperate, collaborate, or communicate, including discussing bids, bidding strategies, or post-auction... schedule in order to foster an auction pace that reasonably balances speed with the bidders' need to study...
Technical Evaluation Report (Mental Health and Well-Being across the Military Spectrum)
2011-04-01
presented: these include virtual reality training, neurofeedback and telerehabilitation. The technologies look promising but currently lack sufficient...third location decompression, telerehabilitation, virtual reality, neurofeedback , PCL, SCID, DSM-IV. 2.0 INTRODUCTION Resolving international... Neurofeedback : Victor Kallen48 presented some recent developments in the use of bio- and neurofeedback to support and enhance recovery and recuperation
Bob Simonson
2011-01-01
The USDA Forest Service Missoula Technology and Development Center (MTDC) offers technical expertise, technology transfer, and new equipment development to federal, state, and private forest nurseries. Current and recently completed projects at MTDC include a front and mid-mount tractor evaluation, ATV-pulled mechanical tree planter, greenhouse snow remover, freeze...
ERIC Educational Resources Information Center
Straubel, James H.
This research was designed to study the effectiveness of transferring vocational-technical military training into the civilian education system. The military training, which was tested in six Utah schools ranging from high school to 4-year college, included electronics principles (90 hours), aircraft pneudraulics (60 hours), and nurse's aide (20…
NASA Technical Reports Server (NTRS)
2008-01-01
This audit was initiated in response to a hotline complaint regarding the review, approval, and release of scientific and technical information (STI) at Johnson Space Center. The complainant alleged that Johnson personnel conducting export control reviews of STI were not fully qualified to conduct those reviews and that the reviews often did not occur until after the STI had been publicly released. NASA guidance requires that STI, defined as the results of basic and applied scientific, technical, and related engineering research and development, undergo certain reviews prior to being released outside of NASA or to audiences that include foreign nationals. The process includes technical, national security, export control, copyright, and trade secret (e.g., proprietary data) reviews. The review process was designed to preclude the inappropriate dissemination of sensitive information while ensuring that NASA complies with a requirement of the National Aeronautics and Space Act of 1958 (the Space Act)1 to provide for the widest practicable and appropriate dissemination of information resulting from NASA research activities. We focused our audit on evaluating the STI review process: specifically, determining whether the roles and responsibilities for the review, approval, and release of STI were adequately defined and documented in NASA and Center-level guidance and whether that guidance was effectively implemented at Goddard Space Flight Center, Johnson Space Center, Langley Research Center, and Marshall Space Flight Center. Johnson was included in the review because it was the source of the initial complaint, and Goddard, Langley, and Marshall were included because those Centers consistently produce significant amounts of STI.
Evaluation of methods for the assay of radium-228 in water
DOE Office of Scientific and Technical Information (OSTI.GOV)
Noyce, J.R.
1981-02-01
The technical literature from 1967 to May 1980 was searched for methods for assaying radium-228 in water. These methods were evaluated for their suitability as potential EPA reference methods for drinking water assays. The authors suggest the present EPA reference method (Krieger, 1976) be retained but improved, and a second method (McCurdy and Mellor, 1979), which employs beta-gamma coincidence counting, be added. Included in this report is a table that lists the principal features of 17 methods for radium-228 assays.
NASA Technical Reports Server (NTRS)
1981-01-01
Space systems concepts were identified and defined and evaluated as to their performance, risks, and technical viability in order to select the most attractive approach for disposal of high level nuclear wastes in space. Major study areas discussed include: (1) mission and operations analysis; (2) waste payload systems; (3) flight support system; (4) launch site systems; (5) launch vehicle systems; (6) orbit transfer system; (7) space disposal destinations; and (8) systems integration and evaluation.
Isotopic compositions of the elements 2013 (IUPAC Technical Report)
Meija, Juris; Coplen, Tyler B.; Berglund, Michael; Brand, Willi A.; De Bièvre, Paul; Gröning, Manfred; Holden, Norman E.; Irrgeher, Johanna; Loss, Robert D.; Walczyk, Thomas; Prohaska, Thomas
2016-01-01
The Commission on Isotopic Abundances and Atomic Weights (ciaaw.org) of the International Union of Pure and Applied Chemistry (iupac.org) has revised the Table of Isotopic Compositions of the Elements (TICE). The update involved a critical evaluation of the recent published literature. The new TICE 2013 includes evaluated data from the “best measurement” of the isotopic abundances in a single sample, along with a set of representative isotopic abundances and uncertainties that accommodate known variations in normal terrestrial materials.
Shalom, Erez; Shahar, Yuval; Lunenfeld, Eitan
2016-02-01
Design, implement, and evaluate a new architecture for realistic continuous guideline (GL)-based decision support, based on a series of requirements that we have identified, such as support for continuous care, for multiple task types, and for data-driven and user-driven modes. We designed and implemented a new continuous GL-based support architecture, PICARD, which accesses a temporal reasoning engine, and provides several different types of application interfaces. We present the new architecture in detail in the current paper. To evaluate the architecture, we first performed a technical evaluation of the PICARD architecture, using 19 simulated scenarios in the preeclampsia/toxemia domain. We then performed a functional evaluation with the help of two domain experts, by generating patient records that simulate 60 decision points from six clinical guideline-based scenarios, lasting from two days to four weeks. Finally, 36 clinicians made manual decisions in half of the scenarios, and had access to the automated GL-based support in the other half. The measures used in all three experiments were correctness and completeness of the decisions relative to the GL. Mean correctness and completeness in the technical evaluation were 1±0.0 and 0.96±0.03 respectively. The functional evaluation produced only several minor comments from the two experts, mostly regarding the output's style; otherwise the system's recommendations were validated. In the clinically oriented evaluation, the 36 clinicians applied manually approximately 41% of the GL's recommended actions. Completeness increased to approximately 93% when using PICARD. Manual correctness was approximately 94.5%, and remained similar when using PICARD; but while 68% of the manual decisions included correct but redundant actions, only 3% of the actions included in decisions made when using PICARD were redundant. The PICARD architecture is technically feasible and is functionally valid, and addresses the realistic continuous GL-based application requirements that we have defined; in particular, the requirement for care over significant time frames. The use of the PICARD architecture in the domain we examined resulted in enhanced completeness and in reduction of redundancies, and is potentially beneficial for general GL-based management of chronic patients. Copyright © 2015 Elsevier Inc. All rights reserved.
Grelier, S; Thetio, M; Quentin, V; Achache, V; Sanchez, N; Leroux, V; Durand, E; Pequignot, R
2011-03-01
The National Hospital of Saint Maurice (HNSM) for Physical Medicine and Rehabilitation aims at strengthening its position as a pivot rehabilitation and physical therapy center. The opening in 2011 of a new unit for the evaluation and treatment of motor disabilities meets this objective. This project includes several parts: clinical, financial, architectural, organizational, applied clinical research as well as dealing with medical equipments and information system. This study focuses on the risk assessment of this future technical unit. This study was conducted by a group of professionals working for the hospital. It started with the design of a functional model to better comprehend the system to be analyzed. Risk assessment consists in confronting this functional model to a list of dangers in order to determine the vulnerable areas of the system. Then the team designed some scenarios to identify the causes, securities barriers and consequences in order to rank the risks. The analysis targeted various dangers, e.g. political, strategic, financial, economical, marketing, clinical and operational. The team identified more than 70 risky scenarios. For 75% of them the criticality level was deemed initially tolerable and under control or unacceptable. The implementation of an action plan for reducing the level of risks before opening this technical unit brought the system down to an acceptable level at 66%. A year prior to opening this technical unit for the evaluation and treatment of motor disabilities, conducting this preliminary risk assessment, with its exhaustive and rigorous methodology, enabled the concerned professionals to work together around an action plan for reducing the risks. 2011 Elsevier Masson SAS. All rights reserved.
Nuclear thermal propulsion transportation systems for lunar/Mars exploration
NASA Technical Reports Server (NTRS)
Clark, John S.; Borowski, Stanley K.; Mcilwain, Melvin C.; Pellaccio, Dennis G.
1992-01-01
Nuclear thermal propulsion technology development is underway at NASA and DoE for Space Exploration Initiative (SEI) missions to Mars, with initial near-earth flights to validate flight readiness. Several reactor concepts are being considered for these missions, and important selection criteria will be evaluated before final selection of a system. These criteria include: safety and reliability, technical risk, cost, and performance, in that order. Of the concepts evaluated to date, the Nuclear Engine for Rocket Vehicle Applications (NERVA) derivative (NDR) is the only concept that has demonstrated full power, life, and performance in actual reactor tests. Other concepts will require significant design work and must demonstrate proof-of-concept. Technical risk, and hence, development cost should therefore be lowest for the concept, and the NDR concept is currently being considered for the initial SEI missions. As lighter weight, higher performance systems are developed and validated, including appropriate safety and astronaut-rating requirements, they will be considered to support future SEI application. A space transportation system using a modular nuclear thermal rocket (NTR) system for lunar and Mars missions is expected to result in significant life cycle cost savings. Finally, several key issues remain for NTR's, including public acceptance and operational issues. Nonetheless, NTR's are believed to be the 'next generation' of space propulsion systems - the key to space exploration.
Evers, David C; Keane, Susan Egan; Basu, Niladri; Buck, David
2016-11-01
The Minamata Convention on Mercury is a multilateral environmental agreement that obligates Parties to reduce or control sources of mercury pollution in order to protect human health and the environment. The Convention includes provisions on providing technical assistance and capacity building, particularly for developing countries and countries with economies in transition, to promote its effective implementation. Evaluating the effectiveness of the Convention (as required by Article 22) is a crucial component to ensure that it meets this objective. We describe an approach to measure effectiveness, which includes a suite of short-, medium-, and long-term metrics related to five major mercury control Articles in the Convention, as well as metrics derived from monitoring of mercury in the environment using select bioindicators, including people. The use of existing biotic Hg data will define spatial gradients (e.g., biological mercury hotspots), baselines to develop relevant temporal trends, and an ability to assess risk to taxa and human communities of greatest concern. We also recommend the development of a technical document that describes monitoring options for the Conference of Parties, to provide science-based standardized guidelines for collecting relevant monitoring information, as guided by Article 19. Copyright © 2016 Elsevier B.V. All rights reserved.
Surgical simulation: Current practices and future perspectives for technical skills training.
Bjerrum, Flemming; Thomsen, Ann Sofia Skou; Nayahangan, Leizl Joy; Konge, Lars
2018-06-17
Simulation-based training (SBT) has become a standard component of modern surgical education, yet successful implementation of evidence-based training programs remains challenging. In this narrative review, we use Kern's framework for curriculum development to describe where we are now and what lies ahead for SBT within surgery with a focus on technical skills in operative procedures. Despite principles for optimal SBT (proficiency-based, distributed, and deliberate practice) having been identified, massed training with fixed time intervals or a fixed number of repetitions is still being extensively used, and simulators are generally underutilized. SBT should be part of surgical training curricula, including theoretical, technical, and non-technical skills, and be based on relevant needs assessments. Furthermore, training should follow evidence-based theoretical principles for optimal training, and the effect of training needs to be evaluated using relevant outcomes. There is a larger, still unrealized potential of surgical SBT, which may be realized in the near future as simulator technologies evolve, more evidence-based training programs are implemented, and cost-effectiveness and impact on patient safety is clearly demonstrated.
Gratton, David G; Kwon, So Ran; Blanchette, Derek; Aquilino, Steven A
2016-01-01
The aim of this study was to evaluate the effect of digital tooth preparation imaging and evaluation technology on dental students' technical abilities, self-evaluation skills, and the assessment of their simulated clinical work. A total of 80 second-year students at one U.S. dental school were assigned to one of three groups: control (n=40), E4D Compare (n=20), and Sirona prepCheck (n=20). Students in the control group were taught by traditional teaching methodologies, and the technology-assisted groups received both traditional training and supplementary feedback from the corresponding digital system. Three outcomes were measured: faculty technical score, self-evaluation score, and E4D Compare scores at 0.30 mm tolerance. Correlations were determined between the groups' scores from visual assessment and self-evaluation and between the visual assessment and digital scores. The results showed that the visual assessment and self-evaluation scores did not differ among groups (p>0.05). Overall, correlations between visual and digital assessment scores were modest though statistically significant (5% level of significance). These results suggest that the use of digital tooth preparation evaluation technology did not impact the students' prosthodontic technical and self-evaluation skills. Visual scores given by faculty and digital assessment scores correlated moderately in only two instances.
The Effect of Technical Performance on Patient Outcomes in Surgery: A Systematic Review.
Fecso, Andras B; Szasz, Peter; Kerezov, Georgi; Grantcharov, Teodor P
2017-03-01
Systematic review of the effect of intraoperative technical performance on patient outcomes. The operating room is a high-stakes, high-risk environment. As a result, the quality of surgical interventions affecting patient outcomes has been the subject of discussion and research for years. MEDLINE, EMBASE, PsycINFO, and Cochrane databases were searched. All surgical specialties were eligible for inclusion. Data were reviewed in regards to the methods by which technical performance was measured, what patient outcomes were assessed, and how intraoperative technical performance affected patient outcomes. Quality of evidence was assessed using the Medical Education Research Study Quality Instrument (MERSQI). Of the 12,758 studies initially identified, 24 articles (7775 total participants) were ultimately included in this review. Seventeen studies assessed the performance of the faculty alone, 2 assessed both the faculty and trainees, 1 assessed trainees alone, and in 4 studies, the level of the operating surgeon was not specified. In 18 studies, a performance assessment tool was used. Patient outcomes were evaluated using intraoperative complications, short-term morbidity, long-term morbidity, short-term mortality, and long-term mortality. The average MERSQI score was 11.67 (range 9.5-14.5). Twenty-one studies demonstrated that superior technical performance was related to improved patient outcomes. The results of this systematic review demonstrated that superior technical performance positively affects patient outcomes. Despite this initial evidence, more robust research is needed to directly assess intraoperative technical performance and its effect on postoperative patient outcomes using meaningful assessment instruments and reliable processes.
NASA Technical Reports Server (NTRS)
Topol, David A.
1999-01-01
TFaNS is the Tone Fan Noise Design/Prediction System developed by Pratt & Whitney under contract to NASA Lewis (presently NASA Glenn). The purpose of this system is to predict tone noise emanating from a fan stage including the effects of reflection and transmission by the rotor and stator and by the duct inlet and nozzle. These effects have been added to an existing annular duct/isolated stator noise prediction capability. TFaNS consists of: The codes that compute the acoustic properties (reflection and transmission coefficients) of the various elements and write them to files. Cup3D: Fan Noise Coupling Code that reads these files, solves the coupling problem, and outputs the desired noise predictions. AWAKEN: CFD/Measured Wake Postprocessor which reformats CFD wake predictions and/or measured wake data so it can be used by the system. This volume of the report provides technical background for TFaNS including the organization of the system and CUP3D technical documentation. This document also provides information for code developers who must write Acoustic Property Files in the CUP3D format. This report is divided into three volumes: Volume I: System Description, CUP3D Technical Documentation, and Manual for Code Developers; Volume II: User's Manual, TFaNS Vers. 1.4; Volume III: Evaluation of System Codes.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
...-Chrysler Technical Training Center, Technology Training Joint Programs Staff, Including On-Site Leased Workers From Cranks, O/E Learning, DBSI, IDEA, and Tonic/MVP, Detroit, MI; UAW-Chrysler Technical Training... workers and former workers of UAW-Chrysler Technical Training Center, Technology Training Joint Programs...
Code of Federal Regulations, 2013 CFR
2013-04-01
...; (ii) Technical data (including data packages, technical papers, manuals, presentations, specifications... person who receives defense articles, including technical data, but who does not have access to such... (other than technical data) shall be individually labeled with the appropriate identification detailed in...
Code of Federal Regulations, 2014 CFR
2014-04-01
... section; (ii) Technical data (including data packages, technical papers, manuals, presentations..., defense articles, including technical data, for the sole purpose of effecting onward movement to members... (other than technical data) shall be individually labeled with the appropriate identification detailed in...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Park, Jung-Hoon; Kim, Pyeong Hwa; Shin, Ji Hoon, E-mail: jhshin@amc.seoul.kr
2016-11-15
PurposeThe purpose of the study was to retrospectively evaluate the technical outcomes of removal of retrievable self-expandable metallic stents (REMSs) and identify predictors of technical failure in 81 patients with benign and malignant tracheobronchial strictures.Materials and MethodsA total of 98 REMSs were removed under fluoroscopic guidance in 81 patients with benign (n = 48) or malignant (n = 33) tracheobronchial strictures. Primary and secondary technical success rates and complication rate were evaluated. Technical outcomes with regard to underlying diseases were also evaluated. Logistic regression models were constructed to identify predictors of primary technical success.ResultsPrimary and secondary technical success rates were 86.7 and 94.9 %, respectively.more » Stent removal-related complication rate was 7.1 % (7/98) and all were bleeding after stent removal. All bleeding complications were minor and managed conservatively. Primary technical success rate for benign strictures was significantly lower compared with that for malignant strictures (80.9 vs. 97.1 %, P = 0.029), but secondary technical success rate (93.7 vs. 97.1 %, P = 0.652) did not differ between the two groups. Granulation tissue formation was identified as an independent predictor of primary technical success (odds ratio 0.249, 95 % CI 0.071–0.874, P = 0.030).ConclusionRemoval of REMSs in patients with benign and malignant tracheobronchial strictures is safe and technically feasible. Bronchoscopic guidance may be required when the removal using a hook wire fails. The presence of granulation tissue was the negative predictor of primary technical success.« less
Technical and physical determinants of soccer match-play performance in elite youth soccer players.
Rowat, Owain; Fenner, Jonathan; Unnithan, Viswanath
2017-04-01
The aim of this study was to evaluate whether physical performance characteristics could be a better predictor than technical skills in determining the technical level of county soccer players in a match situation. With institutional ethics approval, 25 male youth soccer players aged 16-18.5 years from a professional soccer academy in South East Asia were selected and height and body mass were recorded. Players were tested for sexual maturity (pubertal development scale [PDS] self-assessment), aerobic capacity (yo-yo intermittent recovery test level 1 [YYIR1]), repeated sprint ability (7 x 35 m sprints) acceleration (15 m sprint) and four soccer skills tests (dribble with pass, dribbling speed, passing and shooting accuracy). Players' technical ability during match play was assessed in small-sided games of soccer (5 v 5) using a novel game technical scoring chart (scoring chart completed by coaches to assess technical performance in a match situation) developed from criteria (e.g., first touch, dribbling and two footedness) used by youth soccer coaches for talent identification. A Spearman's rank correlation showed the YYIR1 test and 15 m sprint test were limited in predicting technical match performance (r=0.03, P=0.88, r=-0.23, P=0.32 respectively). A Pearson product moment correlation showed that the repeated sprint test was also limited in predicting technical match performance (r=-0.34, P=0.14). A dribbling skill with a pass was found to be the best determinant of a player's technical ability in a match (r=-0.57, P=0.00). Talent identification and selection programs in Asian youth soccer should include a dribbling skill performed with a pass.
2018-01-02
TECHNICAL REPORT NO. T18-01 DATE January 2018 BIOPHYSICAL EVALUATION OF INDIVIDUAL COMPONENT...USARIEM TECHNICAL REPORT T18-01 BIOPHYSICAL EVALUATION OF INDIVIDUAL COMPONENT LEVELS AND...OF TABLES Table Page Table 1. Clothing and individual equipment descriptions ................................................. 3 Table 2. Surface
The Metropolitan Advanced Technical Magnet High School: 1990-1991. Formative Evaluation.
ERIC Educational Resources Information Center
Seever, Mark L.
This report evaluates the implementation of the "Long-Range Magnet School Plan" at Metropolitan Advanced Technical Magnet High School in Kansas City, Missouri for academic year 1990-91. Introductory sections describe the program, and the evaluation design and methodology. Results on enrollment indicated that only ninth and tenth grades…
Evaluation Highlights. Client Feedback from March 2009-March 2010, Compiled April 2010
ERIC Educational Resources Information Center
National Early Childhood Technical Assistance Center (NECTAC), 2010
2010-01-01
The National Early Childhood Technical Assistance Center (NECTAC) Evaluation Unit collects and analyzes data to describe the quantity and nature of the technical assistance services provided by NECTAC staff. The Unit evaluates the quality and relevance of NECTAC services and products and whether TA recipients use the information and resources…
Pregnancy and You. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Sarle, Ruth; And Others
This courseware evaluation rates the "Pregnancy and You" program, developed by Intellectual Software and sold by Career Aids, Inc. The courseware was rated by a team of home economists participating in a network designed to identify and evaluate courseware and disseminate reviews for vocational and technical teachers, media staff, and…
Coronagraph observations and analyses of the ultraviolet solar corona
NASA Technical Reports Server (NTRS)
Kohl, John L.
1989-01-01
The major activities on the Spartan Ultraviolet Coronal Spectrometer project include both scientific and experimental/technical efforts. In the scientific area, a detailed analysis of the previously reported Doppler dimming of HI Ly-alpha from the July 1982 rocket flight has determined an outflow velocity at 2 solar radii from sun center to be between 153 and 251 km/s at 67 percent confidence. The technical activities include, several improvements made to the instrument that will result in enhanced scientific performance or in regaining a capability that had deteriorated during the delay time in the launch date. These include testing and characterizing the detector for OVI radiation, characterizing a serrated occulter at UV and visible wavelengths, fabricating and testing telescope mirrors with improved edges, testing and evaluating a new array detector system, modifying the slit mask mechanism and installing a mask in the instrument to block the Ly-alpha resonance line when the electron scattered component is being observed.
NASA Astrophysics Data System (ADS)
Krkošková, Katarína; Papán, Daniel; Papánová, Zuzana
2017-10-01
The technical seismicity negatively affects the environment, buildings and structures. Technical seismicity means seismic shakes caused by force impulse, random process and unnatural origin. The vibration influence on buildings is evaluated in the Eurocode 8 in Slovak Republic, however, the Slovak Technical Standard STN 73 0036 includes solution of the technical seismicity. This standard also classes bridges into the group of structures that are significant in light of the technical seismicity - the group “U”. Using the case studies analysis by FEM simulation and comparison is necessary because of brief norm evaluation of this issue. In this article, determinate dynamic parameters by experimental measuring and numerical method on two real bridges are compared. First bridge, (D201 - 00) is Scaffold Bridge on the road I/11 leading to the city of Čadca and is situated in the city of Žilina. It is eleven - span concrete road bridge. The railway is the obstacle, which this bridge spans. Second bridge (M5973 Brodno) is situated in the part of Žilina City on the road of I/11. It is concrete three - span road bridge built as box girder. The computing part includes 3D computational models of the bridges. First bridge (D201 - 00) was modelled in the software of IDA Nexis as the slab - wall model. The model outputs are natural frequencies and natural vibration modes. Second bridge (M5973 Brodno) was modelled in the software of VisualFEA. The technical seismicity corresponds with the force impulse, which was put into this model. The model outputs are vibration displacements, velocities and accelerations. The aim of the experiments was measuring of the vibration acceleration time record of bridges, and there was need to systematic placement of accelerometers. The vibration acceleration time record is important during the under - bridge train crossing, about the first bridge (D201 - 00) and the vibration acceleration time domain is important during deducing the force impulse under the bridge, about second bridge (M5973 Brodno). The analysis was done in the software of Sigview. About the first bridge (D201 - 00), the analysis output were values of power spectral density adherent to the frequencies values. These frequencies were compared with the natural frequencies values from the computational model whereby the technical seismicity influence on bridge natural frequencies was found out. About the second bridge (M5973 Brodno), the Sigview display of recorded vibration velocity time history was compared with the final vibration velocity time history from the computational model, whereby the results were incidental.
Decision Support System for Aquifer Recharge (AR) and ...
Aquifer recharge (AR) is a technical method being utilized to enhance groundwater resources through man-made replenishment means, such as infiltration basins and injections wells. Aquifer storage and recovery (ASR) furthers the AR techniques by withdrawal of stored groundwater at a later time for beneficial use. It is a viable adaptation technique for water availability problems. Variants of the water storage practices include recharge through urban green infrastructure and the subsurface injection of reclaimed water, i.e., wastewater, which has been treated to remove solids and impurities. In addition to a general overview of ASR variations, this report focuses on the principles and technical basis for an ASR decision support system (DSS), with the necessary technical references provided. The DSS consists of three levels of tools and methods for ASR system planning and assessment, design, and evaluation. Level 1 of the system is focused on ASR feasibility, for which four types of data and technical information are organized around: 1) ASR regulations and permitting needs, 2) Water demand projections, 3) Climate change and water availability, and 4) ASR sites and technical information. These technical resources are integrated to quantify water availability gaps and the feasibility of using ASR to meet the volume and timing of the water resource shortages. A systemic analysis of water resources was conducted for sustainable water supplies in Las Vegas, Nevada f
Development and evaluation of a patient-centred measurement tool for surgeons' non-technical skills.
Yule, J; Hill, K; Yule, S
2018-06-01
Non-technical skills are essential for safe and effective surgery. Several tools to assess surgeons' non-technical skills from the clinician's perspective have been developed. However, a reliable measurement tool using a patient-centred approach does not currently exist. The aim of this study was to translate the existing Non-Technical Skills for Surgeons (NOTSS) tool into a patient-centred evaluation tool. Data were gathered from four cohorts of patients using an iterative four-stage mixed-methods research design. Exploratory and confirmatory factor analyses were performed to establish the psychometric properties of the tool, focusing on validity, reliability, usability and parsimony. Some 534 patients were recruited to the study. A total of 24 patient-centred non-technical skill items were developed in stage 1, and reduced to nine items in stage 2 using exploratory factor analysis. In stage 3, confirmatory factor analysis demonstrated that these nine items each loaded on to one of three factors, with excellent internal consistency: decision-making, leadership, and communication and teamwork. In stage 4, validity testing established that the new tool was independent of physician empathy and predictive of surgical quality. Surgical leadership emerged as the most dominant skill that patients could recognize and evaluate. A novel nine-item assessment tool has been developed. The Patients' Evaluation of Non-Technical Skills (PENTS) tool allows valid and reliable measurement of surgeons' non-technical skills from the patient perspective. © 2018 BJS Society Ltd Published by John Wiley & Sons Ltd.
Ribeiro, D M; Réus, J C; Felippe, W T; Pacheco-Pereira, C; Dutra, K L; Santos, J N; Porporatti, A L; De Luca Canto, G
2018-03-01
The technical quality of root canal treatment (RCT) may impact on the outcome. The quality of education received during undergraduate school may be linked to the quality of treatment provided in general dental practice. In this context, the aim of this systematic review was to answer the following focused questions: (i) What is the frequency of acceptable technical quality of root fillings, assessed radiographically, performed by undergraduate students? (ii) What are the most common errors assessed radiographically and reported in these treatments? For this purpose, articles that evaluated the quality of root fillings performed by undergraduate students were selected. Data were collected based on predetermined criteria. The key features from the included studies were extracted. GRADE-tool assessed the quality of the evidence. MAStARI evaluated the methodological quality, and a meta-analysis on all studies was conducted. At the end of the screening, 24 articles were identified. Overall frequency of acceptable technical quality of root fillings was 48%. From this total, 52% related to anterior teeth, 49% to premolars and 26% to molars. The main procedural errors reported were ledge formation, furcation perforation, apical transportation and apical perforation. The heterogeneity amongst the studies was high (84-99%). Five studies had a high risk of bias, eight had a moderate risk, and 11 had low risk. The overall quality of evidence identified was very low. The conclusion was that technical quality of root fillings performed by undergraduate students is low, which may reveal that endodontic education has limited achievement at undergraduate level. A plan to improve the quality of root fillings, and by extrapolation the overall quality of root canal treatment, should be discussed by the staff responsible for endodontic education and training. © 2017 International Endodontic Journal. Published by John Wiley & Sons Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-01-01
Tiger Team Assessments and Technical Safety Appraisals (TSA) were reviewed and evaluated for concerns in the Maintenance Area (MA). Two hundred and thirty one (231) maintenance concerns were identified by the Tiger Team Assessments and TSA reports. These recurring concerns appear below. A summary of the Noteworthy Practices that were identified and a compilation of the maintenance concerns for each performance objective that were not considered as recurring are also included. Where the Tiger Team Assessment and TSA identified the operating contractor or facility by name, the concern has been modified to remove the name while retaining the intent ofmore » the comment.« less
NASA Astrophysics Data System (ADS)
Campbell, Nancy S.
This executive position paper examines the critical shortage of Delaware high school science teachers and Delaware Technical & Community College's possible role in addressing this shortage. A concise analysis of economic and political implications of the science teacher shortage is presented. The following topics were researched and evaluated: the specific science teacher needs for Delaware school districts; the science teacher education program offerings at Delaware universities and colleges; the Alternative Route to Teacher Certification (ARTC); and the state of Delaware's scholarship response to the need. Recommendations for Delaware Tech's role include the development and implementation of two new Associate of Arts of Teaching programs in physics secondary science education and chemistry secondary science education.
75 FR 71457 - Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-23
... Division, Technical Services America, Global Parts Supply Chain Group, Including Leased Workers From QFLEX... Division Technical Services America Global Parts Supply Chain Group Including Leased Workers From QFLEX... Enterprise Business Division Technical Services America Global Parts Supply Chain Group Including Leased...
Reducing measurement errors during functional capacity tests in elders.
da Silva, Mariane Eichendorf; Orssatto, Lucas Bet da Rosa; Bezerra, Ewertton de Souza; Silva, Diego Augusto Santos; Moura, Bruno Monteiro de; Diefenthaeler, Fernando; Freitas, Cíntia de la Rocha
2018-06-01
Accuracy is essential to the validity of functional capacity measurements. To evaluate the error of measurement of functional capacity tests for elders and suggest the use of the technical error of measurement and credibility coefficient. Twenty elders (65.8 ± 4.5 years) completed six functional capacity tests that were simultaneously filmed and timed by four evaluators by means of a chronometer. A fifth evaluator timed the tests by analyzing the videos (reference data). The means of most evaluators for most tests were different from the reference (p < 0.05), except for two evaluators for two different tests. There were different technical error of measurement between tests and evaluators. The Bland-Altman test showed difference in the concordance of the results between methods. Short duration tests showed higher technical error of measurement than longer tests. In summary, tests timed by a chronometer underestimate the real results of the functional capacity. Difference between evaluators' reaction time and perception to determine the start and the end of the tests would justify the errors of measurement. Calculation of the technical error of measurement or the use of the camera can increase data validity.
Yun, Jong Hyouk; Jung, Gyoo-Sik; Park, Jung Gu; Kang, Byung Chul; Shin, Dong-Hoon; Yun, Byung Chul; Lee, Sang Uk
2016-04-01
To evaluate the technical feasibility and clinical efficacy of placement of a newly designed Y-shaped branched covered stent for palliative treatment of malignant hilar biliary obstruction. From June 2011 to September 2014, 34 consecutive patients with malignant hilar biliary obstruction underwent percutaneous placement of a Y-shaped branched covered stent for palliative treatment. Technical and clinical success, complications, cumulative patient survival, and stent patency were evaluated. Stent placement was technically successful in all patients. All patients showed adequate biliary drainage on the follow-up cholangiogram. Mean serum bilirubin level (10.9 mg/dl) decreased significantly 1 week (5.7 mg/dl) and 1 month (2.6 mg/dl) after stent placement (p < 0.01). Complications associated with the procedure included hemobilia (n = 3) and biloma (n = 1). During the mean follow-up period of 225 (range 12-820) days, nine patients (26.5%) developed stent occlusion caused by tumor overgrowth (n = 8) and sludge (n = 1). Two of them underwent coaxial placement of a second stent with good results. The median survival time was 281 days and median primary stent patency was 337 days. There were no significant differences in the patient survival and stent patency rates in relation to age, sex, or Bismuth type. Percutaneous placement of the Y-shaped branched covered stent seems to be technically feasible and clinically effective for palliative treatment of malignant hilar biliary obstruction.
Index of USA-CERL Publications.
1985-07-01
Con- struction," by Paul Howdyshell, Nov 74, ADA003833. Technical Report E-63, "Comparative Evaluation of Military and Commercial Ammonia Oxidation ...Feb 81, ADA097222. Technical Report M-284, "An Evaluation of Polyvinyl Chlride (PVC) Single-Ply * Membrane Roofing Systems," by M. Rosentield, Mar 81...Field Welding of Aluminum ," by R. A. Weber, Oct 81, ADA109697. Technical Manuscript P-122, "Expected Use of Micro-Based Network Analysis," by Carl
Code of Federal Regulations, 2014 CFR
2014-04-01
...) and (j)(1)(ii) of this section; (ii) Technical data (including data packages, technical papers... entity or person who receives, but does not have access to, defense articles, including technical data...) Defense articles (other than technical data) shall be individually labeled with the appropriate...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Continuing the tradition established in prior years, this panel encompasses one of the broadest ranges of topics and issues of any panel at the Summer Study. It includes papers addressing all sectors, low-income residential to industrial, and views energy efficiency from many perspectives including programmatic, evaluation, codes, standards, legislation, technical transfer, economic development, and least-cost planning. The papers represent work being performed in most geographic regions of the United States and in the international arena, specifically Thailand, China, Europe, and Scandinavia. This delightful smorgasbord has been organized, based on general content area, into the following eight sessions: (1) new directionsmore » for low-income weatherization; (2) pursuing efficiency through legislation and standards; (3) international perspectives on energy efficiency; (4) technical transfer strategies; (5) government energy policy; (6) commercial codes and standards; (7) innovative programs; and, (8) state-of-the-art review. For these conference proceedings, individual papers are processed separately for the Energy Data Base.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less
McCobb, Emily; Rozanski, Elizabeth A; Malcolm, Elizabeth L; Wolfus, Gregory; Rush, John E
Providing veterinary students with opportunities to develop clinical skills in a realistic, hands-on environment remains a challenge for veterinary education. We have developed a novel approach to teaching clinical medicine to fourth-year veterinary students and technical high school students via development of a primary care clinic embedded within a technical high school. The primary care clinic targets an underserved area of the community, which includes many of the participating high school students. Support from the veterinary community for the project has been strong as a result of communication, the opportunity for veterinarians to volunteer in the clinic, and the careful targeting of services. Benefits to veterinary students include the opportunity to build clinical competencies and confidence, as well as the exposure to a diverse client population. The financial model of the clinic is described and initial data on outcomes for case load, clinic income, veterinary student evaluations, and high school students' success in passing the veterinary assisting examination are reported. This clinical model, involving a partnership between a veterinary school and a technical high school, may be adoptable to other clinical teaching situations.
NASA Astrophysics Data System (ADS)
Nguyen, Hoa G.; Castelli, Robin
2014-06-01
The U.S. Navy and Marine Corps conduct thousands of Maritime Interdiction Operations (MIOs) every year around the globe. Navy Visit, Board, Search, and Seizure (VBSS) teams regularly board suspect ships and perform search operations, often in hostile environments. There is a need for a small tactical robot that can be deployed ahead of the team to provide enhanced situational awareness in these boarding, breaching, and clearing operations. In 2011, the Space and Naval Warfare Systems Center Pacific conducted user evaluations on a number of small throwable robots and sensors, verified the requirements, and developed the key performance parameters (KPPs) for an MIO robot. Macro USA Corporation was then tasked to design and develop two prototype systems, each consisting of one control/display unit and two small amphibious Stingray robots. Technical challenges included the combination paddle wheel/shock-absorbing wheel, the tradeoff between impact resistance, size, and buoyancy, and achieving adequate traction on wet surfaces. This paper describes the technical design of these robots and the results of subsequent user evaluations by VBSS teams.
Front-end Electronics for Unattended Measurement (FEUM). Results of Prototype Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, Ryan C.; Keller, Daniel T.; Morris, Scott J.
2015-07-01
The International Atomic Energy Agency (IAEA) deploys unattended monitoring systems to provide continuous monitoring of nuclear material within safeguarded facilities around the world. As the number of unattended monitoring instruments increases, the IAEA is challenged to become more efficient in the implementation of those systems. In 2010, the IAEA initiated the Front-End Electronics for Unattended Measurement (FEUM) project with the goals of greater flexibility in the interfaces to various sensors and data acquisition systems, and improved capabilities for remotely located sensors (e.g., where sensor and front-end electronics might be separated by tens of meters). In consultation with the IAEA, amore » technical evaluation of a candidate FEUM device produced by a commercial vendor has been performed. This evaluation assessed the device against the IAEA’s original technical specifications and a broad range of important parameters that include sensor types, cable lengths and types, industrial electromagnetic noise that can degrade signals from remotely located detectors, and high radiation fields. Testing data, interpretation, findings and recommendations are provided.« less
Ontology Based Quality Evaluation for Spatial Data
NASA Astrophysics Data System (ADS)
Yılmaz, C.; Cömert, Ç.
2015-08-01
Many institutions will be providing data to the National Spatial Data Infrastructure (NSDI). Current technical background of the NSDI is based on syntactic web services. It is expected that this will be replaced by semantic web services. The quality of the data provided is important in terms of the decision-making process and the accuracy of transactions. Therefore, the data quality needs to be tested. This topic has been neglected in Turkey. Data quality control for NSDI may be done by private or public "data accreditation" institutions. A methodology is required for data quality evaluation. There are studies for data quality including ISO standards, academic studies and software to evaluate spatial data quality. ISO 19157 standard defines the data quality elements. Proprietary software such as, 1Spatial's 1Validate and ESRI's Data Reviewer offers quality evaluation based on their own classification of rules. Commonly, rule based approaches are used for geospatial data quality check. In this study, we look for the technical components to devise and implement a rule based approach with ontologies using free and open source software in semantic web context. Semantic web uses ontologies to deliver well-defined web resources and make them accessible to end-users and processes. We have created an ontology conforming to the geospatial data and defined some sample rules to show how to test data with respect to data quality elements including; attribute, topo-semantic and geometrical consistency using free and open source software. To test data against rules, sample GeoSPARQL queries are created, associated with specifications.
Hagemann, Vera; Herbstreit, Frank; Kehren, Clemens; Chittamadathil, Jilson; Wolfertz, Sandra; Dirkmann, Daniel; Kluge, Annette; Peters, Jürgen
2017-03-29
The purpose of this study is to evaluate the effects of a tailor-made, non-technical skills seminar on medical student's behaviour, attitudes, and performance during simulated patient treatment. Seventy-seven students were randomized to either a non-technical skills seminar (NTS group, n=43) or a medical seminar (control group, n=34). The human patient simulation was used as an evaluation tool. Before the seminars, all students performed the same simulated emergency scenario to provide baseline measurements. After the seminars, all students were exposed to a second scenario, and behavioural markers for evaluating their non-technical skills were rated. Furthermore, teamwork-relevant attitudes were measured before and after the scenarios, and perceived stress was measured following each simulation. All simulations were also evaluated for various medical endpoints. Non-technical skills concerning situation awareness (p<.01, r=0.5) and teamwork (p<.01, r=0.45) improved from simulation I to II in the NTS group. Decision making improved in both groups (NTS: p<.01, r=0.39; control: p<.01, r=0.46). The attitude 'handling errors' improved significantly in the NTS group (p<.05, r=0.34). Perceived stress decreased from simulation I to II in both groups. Medical endpoints and patients´ outcome did not differ significantly between the groups in simulation II. This study highlights the effectiveness of a single brief seminar on non-technical skills to improve student's non-technical skills. In a next step, to improve student's handling of emergencies and patient outcomes, non-technical skills seminars should be accompanied by exercises and more broadly embedded in the medical school curriculum.
Breadboard linear array scan imager using LSI solid-state technology
NASA Technical Reports Server (NTRS)
Tracy, R. A.; Brennan, J. A.; Frankel, D. G.; Noll, R. E.
1976-01-01
The performance of large scale integration photodiode arrays in a linear array scan (pushbroom) breadboard was evaluated for application to multispectral remote sensing of the earth's resources. The technical approach, implementation, and test results of the program are described. Several self scanned linear array visible photodetector focal plane arrays were fabricated and evaluated in an optical bench configuration. A 1728-detector array operating in four bands (0.5 - 1.1 micrometer) was evaluated for noise, spectral response, dynamic range, crosstalk, MTF, noise equivalent irradiance, linearity, and image quality. Other results include image artifact data, temporal characteristics, radiometric accuracy, calibration experience, chip alignment, and array fabrication experience. Special studies and experimentation were included in long array fabrication and real-time image processing for low-cost ground stations, including the use of computer image processing. High quality images were produced and all objectives of the program were attained.
ERIC Educational Resources Information Center
Enterprises for New Directions, Inc., Washington, DC.
In accordance with federally mandated evaluation requirements, Enterprises for New Directions (END), Inc., was requested to conduct a summative external evaluation of the 1977-78 Association of Community College Trustees (ACCTion) Consortium. The Consortium consists of 114 two-year colleges nationwide which receive technical assistance through…
ERIC Educational Resources Information Center
Pipes, V. David
As part of a periodic evaluation of the occupational programs at Caldwell Community College and Technical Institute (CCC&TI), a study of the radiography program was conducted to collect information to facilitate planning, aid in program improvement, and meet accountability demands. The specific objectives of the program evaluation were to…
Evaluating the Effectiveness of the Utah Career and Technical Education Introduction Course
ERIC Educational Resources Information Center
Spielmaker, Debra Marie
2013-01-01
This quantitative study evaluated the gains and evaluation outcomes of the compulsory Career and Technical Education (CTE) Introduction course. All Utah public school seventh-grade students are required to enroll in this school-year course. The matched-pair design used preexisting data to analyze 6,078 pre-and postsurvey responses collected at the…
Evaluation of the Student Engagement Process in a Criminal Justice Program at a Technical College
ERIC Educational Resources Information Center
Totzke, Martin W.
2007-01-01
This applied dissertation was an evaluation of the student engagement practices offered to students in a criminal justice program at a Midwestern technical college. The problem was that an evaluation of the practices had not been conducted to provide data to indicate whether the current practices were effective. The researcher developed an…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-26
... Systems, Including On-Site Leased Workers From Technical Needs and National Engineering, Nashua, New... to the production of electrical connectors and backplane assemblies. The subject worker group includes on-site leased workers from Technical Needs and National Engineering. Workers of the subject firm...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-72,924] Heritage Aviation, Ltd., Including On-Site Leased Workers From Global Technical Services and Global, Inc. (Global Employment... from Heritage Aviation, Ltd, including on-site leased workers from Global Technical Services, Grand...
Satellite Power Systems (SPS): Concept development and evaluation program: Preliminary assessment
NASA Technical Reports Server (NTRS)
1979-01-01
A preliminary assessment of a potential Satellite Power System (SPS) is provided. The assessment includes discussion of technical and economic feasibility; the effects of microwave power transmission beams on biological, ecological, and electromagnetic systems; the impact of SPS construction, deployment, and operations on the biosphere and on society; and the merits of SPS compared to other future energy alternatives.
ERIC Educational Resources Information Center
Hambleton, Ronald K., Ed.; Zaal, Jac N., Ed.
The 14 chapters of this book focus on the technical advances, advances in applied settings, and emerging topics in the testing field. Part 1 discusses methodological advances, Part 2 considers developments in applied settings, and Part 3 reviews emerging topics in the field of testing. Part 1 papers include: (1) "Advances in…
ERIC Educational Resources Information Center
Pennsylvania State Univ., University Park. Div. of Occupational and Vocational Studies.
A project was undertaken to implement the employability, reading, and math skills of disadvantaged students in vocational education. Included in the project were the following activities: (1) field tests, evaluation, and dissemination of a mathematics skills curriculum guide for disadvantaged learners; (2) field tests and revision of guidelines…
NASA Technical Reports Server (NTRS)
Polhamus, E. C.
1979-01-01
An overview is presented of 32 formal papers and 7 open session papers. Topics covered include: (1) studies of configurations of practical interest; (2) mathematical modelling and supporting investigations of slender wings, bodies of revolution, and body-wing configurations; (3) design methods; and (4) air intakes.
Power beaming research at NASA
NASA Technical Reports Server (NTRS)
Rather, John D. G.
1992-01-01
NASA's current research activities to evaluate laser power beaming systems are summarized with regard to their applications of greatest interest. Key technical certainties and uncertainties pertaining to laser power beaming systems appropriate for space applications are quantified. A path of development is presented that includes maturation of key technology components for reliable laser and millimeter wave power beaming systems during the 1990s.
ERIC Educational Resources Information Center
Hill, Allison
A 3-year workplace literacy project combined the resources and efforts of a junior and a technical college, literacy education providers, and businesses to implement an assessment and education program for textile workers. The program included four components: (1) reading, writing, speaking, listening, and mathematics skills; (2) creative…
ERIC Educational Resources Information Center
California Univ., Los Angeles.
Papers included are: (1) "Intent and Purposes of Part I of the Vocational Education Amendments of 1968" by M.L. Barlow, (2) "The Future of Vocational Curriculum Development" by G.B. Leighbody, (3) "Evaluation of Curriculum Materials and Their Use" by W.J. Popham, (4) "Current Trends in Curriculum Theory and…
Management of Social Incentives in Air Force Technical Training: A Field Experiment. Final Report.
ERIC Educational Resources Information Center
Hakel, Milton D.; And Others
The report is a study of the utility of social reinforcement for improving Air Force training. It was conducted through a field evaluation of social incentive instructional systems which would serve to improve student motivation, classroom performance, and attitudes. The participants included a total of 300 trainees from two Air Force bases; 25…
The manuscript is part of an FY14 RAP product: "Functional Assessment of Alaska Peatlands in Cook Inlet Basin: A report to Region 10". This report included this technical information product which is a manuscript that has now been fully revised, reviewed and published...
ERIC Educational Resources Information Center
Matthews, Dorothy, Ed.
1978-01-01
The ten articles in this journal report on research and practice in the teaching of writing. Topics covered include sentence combining as a composition technique, peer evaluation in a technical writing class, a plan for teaching paragraph construction, the use of literary humor in a writing class, methods for setting the scene, how students view…
ERIC Educational Resources Information Center
Santibariz, Lucrecia; Martinez, Jose Felipe; Datar, Ashlesha; McEwan, Patrick J.; Setodji, Claude Messan; Basurto-Davilao, Ricardo
2007-01-01
Mexico's Carrera Magisterial was instituted in 1992 and designed jointly by the federal education authorities, state authorities, and the teachers' union as a horizontal promotion system that rewards teachers with salary bonuses on the basis of their performance. Teacher performance is evaluated through a series of assessments, including teacher…
ERIC Educational Resources Information Center
Borko, Hilda; Stecher, Brian; Kuffner, Karin
2007-01-01
This document includes the final data collection and scoring tools created by the "Scoop" project, a five-year project funded through the Center for Evaluation, Standards,and Student Testing (CRESST), to develop an alternative approach for characterizing classroom practice. The goal of the project was to use artifacts and related materials to…
RFA Guardian: Comprehensive Simulation of Radiofrequency Ablation Treatment of Liver Tumors.
Voglreiter, Philip; Mariappan, Panchatcharam; Pollari, Mika; Flanagan, Ronan; Blanco Sequeiros, Roberto; Portugaller, Rupert Horst; Fütterer, Jurgen; Schmalstieg, Dieter; Kolesnik, Marina; Moche, Michael
2018-01-15
The RFA Guardian is a comprehensive application for high-performance patient-specific simulation of radiofrequency ablation of liver tumors. We address a wide range of usage scenarios. These include pre-interventional planning, sampling of the parameter space for uncertainty estimation, treatment evaluation and, in the worst case, failure analysis. The RFA Guardian is the first of its kind that exhibits sufficient performance for simulating treatment outcomes during the intervention. We achieve this by combining a large number of high-performance image processing, biomechanical simulation and visualization techniques into a generalized technical workflow. Further, we wrap the feature set into a single, integrated application, which exploits all available resources of standard consumer hardware, including massively parallel computing on graphics processing units. This allows us to predict or reproduce treatment outcomes on a single personal computer with high computational performance and high accuracy. The resulting low demand for infrastructure enables easy and cost-efficient integration into the clinical routine. We present a number of evaluation cases from the clinical practice where users performed the whole technical workflow from patient-specific modeling to final validation and highlight the opportunities arising from our fast, accurate prediction techniques.
ERIC Educational Resources Information Center
Fite, Ronald S.
This report details the research activities conducted by Del Mar College, as a subcontractor of Project FOLLOW-UP, in the design, development, and implementation of a graduate follow-up system. The activities included questionnaire design, development of manual and computerized record-keeping systems, student-graduate identification, and…
Towards a Credibility Assessment of Models and Simulations
NASA Technical Reports Server (NTRS)
Blattnig, Steve R.; Green, Lawrence L.; Luckring, James M.; Morrison, Joseph H.; Tripathi, Ram K.; Zang, Thomas A.
2008-01-01
A scale is presented to evaluate the rigor of modeling and simulation (M&S) practices for the purpose of supporting a credibility assessment of the M&S results. The scale distinguishes required and achieved levels of rigor for a set of M&S elements that contribute to credibility including both technical and process measures. The work has its origins in an interest within NASA to include a Credibility Assessment Scale in development of a NASA standard for models and simulations.
Technical Evaluation of Metal Detectors for Concealed Weapons (Supplement 1)
DOT National Transportation Integrated Search
1972-04-01
This document augments the classification and technical evaluation of Commercial Metal Detectors presented in Report No. DOT-TSC-OST-71-15, June 1971. Data based on extensive laboratory tests are presented on two hand-held models and two walk-through...
48 CFR 1352.215-70 - Proposal preparation.
Code of Federal Regulations, 2012 CFR
2012-10-01
...; justifications for noncompetitive proposed subcontracts; identification of technical data to be withheld; and any... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be organized, staffed, and managed that demonstrates the offeror's understanding and effective management of...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
NASA Technical Reports Server (NTRS)
Taylor, James C.
2002-01-01
This research project was designed as part of a larger effort to help Human Factors (HF) implementers, and others in the aviation maintenance community, understand, evaluate, and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions; on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2001, three issues were addressed. First a prototype process for measuring performance was developed and used. Second an automated calculator was developed to aid the HF implementer user in analyzing and evaluating local survey data. These results include being automatically compared with the experience from all MRM programs studied since 1991. Third the core survey (the Maintenance Resource Management Technical Operations Questionnaire, or 'MRM/TOQ') was further developed and tested to include topics of added relevance to the industry.
Space Fence PDR Concept Development Phase
NASA Astrophysics Data System (ADS)
Haines, L.; Phu, P.
2011-09-01
The Space Fence, a major Air Force acquisition program, will become the dominant low-earth orbit uncued sensor in the space surveillance network (SSN). Its primary objective is to provide a 24/7 un-cued capability to find, fix, and track small objects in low earth orbit to include emerging and evolving threats, as well as the rapidly growing population of orbital debris. Composed of up to two geographically dispersed large-scale S-band phased array radars, this new system-of-systems concept will provide comprehensive Space Situational Awareness through net-centric operations and integrated decision support. Additionally, this program will facilitate cost saving force structure changes in the SSN, specifically including the decommissioning of very-high frequency VHF Air Force Space Surveillance System (AFSSS). The Space Fence Program Office entered a Preliminary Design Review (PDR) concept development phase in January 2011 to achieve the delivery of the Initial Operational Capability (IOC) expected in FY17. Two contractors were awarded to perform preliminary system design, conduct radar performance analyses and evaluations, and develop a functional PDR radar system prototype. The key objectives for the Phase A PDR effort are to reduce Space Fence total program technical, cost, schedule, and performance risk. The overall program objective is to achieve a preliminary design that demonstrates sufficient technical and manufacturing maturity and that represents a low risk, affordable approach to meet the Space Fence Technical Requirements Document (TRD) requirements for the final development and production phase to begin in 3QFY12. This paper provides an overview of the revised Space Fence program acquisition strategy for the Phase-A PDR phase to IOC, the overall program milestones and major technical efforts. In addition, the key system trade studies and modeling/simulation efforts undertaken during the System Design Requirement (SDR) phase to address and mitigate technical challenges of the Space Fence System will also be discussed. Examples include radar system optimization studies, modeling and simulation for system performance assessment, investigation of innovative Astrodynamics algorithms for initial orbit determination and observation correlation.
Gwon, Dong Il; Ko, Gi-Young; Yoon, Hyun-Ki; Kim, Jin Hyoung; Lee, Jae Myeong; Ohm, Joon-Young; Sung, Kyu-Bo
2010-09-01
To investigate the technical and clinical safety and efficacy of using a newly designed T-configured stent graft for palliative treatment of advanced hilar malignant biliary obstructions. This is a prospective study that enrolled 30 patients who had malignant hilar obstructions from May 2007 to November 2008. All patients were treated with percutaneous transhepatic placement of two specially designed stent grafts in a T configuration. Technical success, evaluation of blocked branching ducts, complications, clinical success, stent patency time, and patient survival rates were analyzed. Stent graft deployment was technically successful in all patients. The bilirubin level and the bile duct diameter decreases were statistically significant after stent placement (P < .001), and all patients showed clinical improvement. Minor complications, including procedure-related complications (self-limiting hemobilia [n = 3], perihepatic biloma [n = 1], and acute pancreatitis [n = 1]) and rapidly resolving cholangitis (n = 5), occurred in ten patients (33.3%). Major complications, including acute cholecystitis, occurred in three patients (10%). Stent occlusion occurred in 12 patients (40%) after a mean period of 160 days (range, 82-307 days). The median survival and stent patency times were 334 days (range, 195.6-472.4 days) and 279 days (range, 194.7-363.3 days), respectively. There were no statistical differences in age, sex, Bismuth type, or number of blocked branching ducts. The initial results of percutaneous palliative treatment of advanced hilar malignancies with T-configured stent grafts suggest that they are safe and potentially clinically effective. Copyright 2010 SIR. Published by Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... Executive and Technical Teams; Notification of Availability of Documents. AGENCY: U.S. Army Corps of... public all work products of the Chetco River Gravel Mining Executive and Technical Teams. These work... INFORMATION: The Executive and Technical Teams were established in 2007 as part of an initiative to evaluate...
ERIC Educational Resources Information Center
Tobias, Earole; And Others
Designed for faculty members at Beaufort Technical College (BTC) in South Carolina, this handbook describes the college's faculty evaluation process and procedures. The first sections of the handbook explain the rationale and method for the faculty evaluation process, state the purposes and objectives of the system, and offer a model which breaks…
ERIC Educational Resources Information Center
Pipes, V. David
In fall 1981, the cosmetology program at Caldwell Community College and Technical Institute (CCC&TI) was evaluated as part of a process to create a model for the periodic evaluation of all occupational programs at the school. In addition to collecting information for planning and program improvement, the study sought to assess the achievement of…
ERIC Educational Resources Information Center
Filby, Nikola N.
The development and refinement of the measures of student achievement in reading and mathematics for the Beginning Teacher Evaluation Study are described. The concept of reactivity to instruction is introduced: the tests used to evaluate instructional processes must be sensitive indicators of classroom learning overtime. Data collection activities…
Predictors of Attitudes Toward Non-Technical Skills in Farming.
Irwin, Amy; Poots, Jill
2018-01-01
Farming is a high-risk sector with up to 170,000 worldwide fatalities reported per year; it is therefore vital to identify methods of mitigating the dangers of this industry. Research within high-risk industries, such as aviation, shipping, and agriculture, has identified the importance of non-technical skills (NTS) in maintaining effective, safe performance and reducing error and injury. However, there is a lack of research evaluating factors that may contribute to NTS attitudes and behaviors. As a first step to address this literature gap, the current study evaluated a range of individual and environmental factors as potential predictors of attitudes toward NTS in agriculture. A sample of 170 farmers from within the United Kingdom and Ireland were surveyed using an online questionnaire. The questionnaire included measures of personality, stress, attitudes toward safety (safety climate, motivation, and risk), environmental stressors (workload, work-life imbalance), and non-technical skills (team and lone worker). Attitudes toward safety climate, compliance, and motivation showed a significant association with both team-based and lone worker NTS. Conscientiousness correlated positively with the majority of the NTS elements. Multiple regression analysis indicated neuroticism and conscientiousness demonstrated capacity to predict NTS attitudes. Concerns about costs and equipment, attitudes toward safety climate, and safety motivation were also found to be significant predictors of NTS attitudes. The results indicate the utility of individual characteristics and environmental factors when predicting farming NTS attitudes. As a result, these elements could be important when evaluating engagement with NTS and developing NTS training initiatives in agriculture.
Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program
NASA Astrophysics Data System (ADS)
Selwitz, Jason Lawrence
Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum and course development and evaluation research. First, the context of, and impetus for, what was formerly called vocational education, now referred to as technical or workforce education, is provided. Second, the research that was undertaken to design and evaluate an associate degree-level STEM workforce education program is described. Third, the adaptation of a student self-assessment of learning gains instrument is reviewed, and an analysis of the resulting data using an adapted logic model is provided, to evaluate the extent to which instructional approaches, in two process control/improvement-focused courses, were effective in meeting course-level intended learning outcomes. Finally, eight integrative multiscale exercises were designed from two example process systems, wastewater treatment and fast pyrolysis. The integrative exercises are intended for use as tools to accelerate the formation of an operator-technician's multiscale vision of systems, unit operations, underlying processes, and fundamental reactions relevant to multiple industries. Community and technical colleges serve a vital function in STEM education by training workers for medium- and high-skilled technical careers and providing employers the labor necessary to operate and maintain thriving business ventures. Through development of the curricular, course, and assessment-related instruments and tools, this research helps ensure associate degree-level technical education programs can engage in a continual process of program evaluation and improvement.
22 CFR 125.4 - Exemptions of general applicability.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., except detailed design, development, production or manufacturing information; (7) Technical data..., production, or manufacture of any defense article; (4) Copies of technical data, including classified..., development, production, or manufacture of any defense article; (9) Technical data, including classified...
The Accreditation Experience of Clinical Laboratories and Blood Banks in Mexico.
Quintana, Sandra
2015-11-01
The accreditation of clinical laboratories and blood banks based on ISO 15189 is now being consolidated in Mexico, and is coordinated by the Mexican accreditation entity innovative strategies, A.C. (ema) and supported by the activities of the committee of clinical laboratories and blood banks. The active participation in working groups formed by the technical committee of clinical laboratories and blood banks in specific areas, has contributed to the formulation of technical documents and criteria of evaluation that strengthen the current accreditation scheme. The national registry of evaluation (PNE) consists of technical experts and evaluators from different disciplines of clinical laboratory; the evaluators actively participate in accreditation assessment, with an ultimate goal to receive training and feedback for continuous improvement of its own performance.
Technical Guidance for Assessing Environmental Justice in ...
The Technical Guidance for Assessing Environmental Justice in Regulatory Analysis (also referred to as the Environmental Justice Technical Guidance or EJTG) is intended for use by Agency analysts, including risk assessors, economists, and other analytic staff that conduct analyses to evaluate EJ concerns in the context of regulatory actions. Senior EPA managers and decision makers also may find this document useful to understand analytic expectations and to ensure that EJ concerns are appropriately considered in the development of analyses to support regulatory actions under EPA’s action development process. Specifically, the document outlines approaches and methods to help Agency analysts evaluate EJ concerns. The document provides overarching direction to analysts by outlining a series of questions that will ensure the decision maker has appropriate information about baseline risks across population groups, and how those risks are distributed under the options being considered. In addition, the document provides a set of recommendations and requirements as well as best practices for use in analyzing and reporting results from consideration of EJ concerns. These principles will help ensure consistency, quality, and transparency across regulatory actions, while allowing for flexibility needed across different regulatory actions. The purpose of the EJTG is ensure consistency, quality, and transparency in considering environmental justice, while allowing f
Kumar, Rohan; Chung, Wen Yuan; Dennison, Ashley Robert; Garcea, Giuseppe
2016-04-01
Autologous islet transplantation (IAT) following pancreatectomy is now a recognized, albeit highly specialized procedure carried out in a small number of centers worldwide. Current clinical principles and best practice with emphasis on examining the technical aspects of surgery in centers with significant IAT experience are reviewed. Literature search for studies discussing any technical aspect of pancreatectomy with intraportal IAT was included. Thirty-five papers were included; all were single-center case series. The indications, surgical approach to pancreatectomy with IAT, islet yield, static pancreas preservation prior to islet digestion, portal vein access, absolute islet infusion volumes, and portal venous pressure changes during transfusion evaluated. IAT is considered a "last resort" when alternative approaches have been exhausted. Pre-morbid histology and prior surgical drainage adversely influence islet yields and may influence the clinical decision to perform pancreatectomy and IAT. Following pancreas digestion, absolute numbers of islets recovered and smaller islet size predict rates of insulin independence following IAT. Islet volumes and portal venous pressure changes are important factors for the development of complications. Surgical access for IAT includes intra-operative, immediate or delayed infusion via an "exteriorized" vein, and radiological percutaneous approaches. Delayed infusion can be combined with pancreas preservation techniques prior to islet isolation. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Direct heat geothermal opportunities at Pahoa, Hawaii
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moreau, J.; Jones, W.L.
1980-09-01
A geothermal commercial park located near Pahoa, Hawaii, has been found to be technically feasible. However, community acceptance varies from optimistic support for the job opportunities to only lukewarm acceptance by most residents of the nearby planned residential community. Interviews, team evaluations, and calculations of energy and transportation savings were used to reduce a list of candidate processes to four. These four include an ethanol plant, a cattle feed mill, a protein recovery plant, and a papaya processing facility. In addition, a research laboratory is planned for the evaluation of other processes identified as very promising.
Satellite Power System (SPS) FY 79 program summary
NASA Technical Reports Server (NTRS)
1980-01-01
The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.
Investigation of test methods, material properties, and processes for solar cell encapsulants
NASA Technical Reports Server (NTRS)
Willis, P. B.
1983-01-01
A study of potentially useful low cost encapsulation materials for the Flat-Plate Solar Array project is discussed. The goal is to identify, evaluate, test and recommend encapsulant materials and processes for the production of cost-effective, long life solar cell modules. Technical investigations included studies of aging and degradation of candidate encapsulation materials, continued identification of primers for durable bonding of module interfaces, continued evaluation of soil resistant treatments for the sunlit surface of the module and testing of corrosion protective coatings for use low cost mild steel substrates.
Evaluation Studies of Robotic Rollators by the User Perspective: A Systematic Review.
Werner, Christian; Ullrich, Phoebe; Geravand, Milad; Peer, Angelika; Hauer, Klaus
2016-01-01
Robotic rollators enhance the basic functions of established devices by technically advanced physical, cognitive, or sensory support to increase autonomy in persons with severe impairment. In the evaluation of such ambient assisted living solutions, both the technical and user perspectives are important to prove usability, effectiveness and safety, and to ensure adequate device application. The aim of this systematic review is to summarize the methodology of studies evaluating robotic rollators with focus on the user perspective and to give recommendations for future evaluation studies. A systematic literature search up to December 31, 2014, was conducted based on the Cochrane Review methodology using the electronic databases PubMed and IEEE Xplore. Articles were selected according to the following inclusion criteria: evaluation studies of robotic rollators documenting human-robot interaction, no case reports, published in English language. Twenty-eight studies were identified that met the predefined inclusion criteria. Large heterogeneity in the definitions of the target user group, study populations, study designs and assessment methods was found across the included studies. No generic methodology to evaluate robotic rollators could be identified. We found major methodological shortcomings related to insufficient sample descriptions and sample sizes, and lack of appropriate, standardized and validated assessment methods. Long-term use in habitual environment was also not evaluated. Apart from the heterogeneity, methodological deficits in most of the identified studies became apparent. Recommendations for future evaluation studies include: clear definition of target user group, adequate selection of subjects, inclusion of other assistive mobility devices for comparison, evaluation of the habitual use of advanced prototypes, adequate assessment strategy with established, standardized and validated methods, and statistical analysis of study results. Assessment strategies may additionally focus on specific functionalities of the robotic rollators allowing an individually tailored assessment of innovative features to document their added value. © 2016 S. Karger AG, Basel.
Mensel, Birger; Kühn, Jens-Peter; Träger, Tobias; Dührkoop, Martin; von Bernstorff, Wolfram; Rosenberg, Christian; Hoene, Andreas; Puls, Ralf
2012-01-01
The technical evolution of endografts for the interventional management of infrarenal abdominal aortic aneurysms (AAA) has allowed a continuous expansion of indications. This study compares the established Talent endograft with its successor, the Endurant endograft, taking individual aortoiliac anatomy into account. From June 2007 to December 2010, 35 patients with AAA were treated with a Talent endograft (33 men) and 36 patients with an Endurant endograft (34 men). Aortoiliac anatomy was evaluated in detail using preinterventional computed tomography angiography. The 30-day outcome of both groups were compared regarding technical and clinical success as well as complications including endoleaks. The Endurant group included more patients with unfavorable anatomy (kinking of pelvic arteries, p = 0.017; shorter proximal neck, p = 0.084). Primary technical success was 91.4% in the Talent group and 100% in the Endurant group (p = 0.115). Type 1 endoleaks occurred in 5.7% of patients in the Talent group and in 2.8% of those in the Endurant group (p = 0.614). Type 3 endoleaks only occurred in the Talent group (2.9% of patients; p = 0.493). Type 2 endoleaks were significantly less common in the Endurant group than in the Talent group (8.3% versus 28.6%; p = 0.035). Rates of major and minor complications were not significantly different between both groups. Primary clinical success was significantly better in the Endurant group (97.2%) than in the Talent group (80.0%) (p = 0.028). Endurant endografts appear to have better technical and clinical outcome in patients with difficult aortoiliac anatomy, significantly reducing the occurrence of type 2 endoleaks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looney, B.; Eddy-Dilek, C.; Costanza, J.
2008-12-15
The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personnel, evaluated work plans, determined critical issues and uncertainties, and recommended alternatives. This report documents the findings and recommendations of the independent technical review team.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... DEPARTMENT OF JUSTICE National Institute of Corrections Solicitation for a Cooperative Agreement--Evaluation of Technical Assistance for Evidence-Based Decisionmaking in Local Criminal Justice Systems AGENCY: National Institute of Corrections, U.S. Department of Justice. ACTION: Solicitation for a Cooperative...
EPA OFFICE OF RESEARCH AND DEVELOPMENT GUIDELINES FOR TECHNICAL EVALUATION OF ECOLOGICAL INDICATORS
EPA's Office of Research and Development (ORD) has prepared fifteen technical guidelines to evaluate the suitability of an ecological indicator in a monitoring program. The guidelines were fashioned to provide a consistent framework for indicator review and to provide direction f...
The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a Request for Proposals for applicants to provide the Chesapeake Bay Program partners with a proposal(s) for providing technical analysis and programmatic evaluation
Clean Energy Application Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Freihaut, Jim
2013-09-30
The Mid Atlantic Clean Energy Application Center (MACEAC), managed by The Penn State College of Engineering, serves the six states in the Mid-Atlantic region (Pennsylvania, New Jersey, Delaware, Maryland, Virginia and West Virginia) plus the District of Columbia. The goals of the Mid-Atlantic CEAC are to promote the adoption of Combined Heat and Power (CHP), Waste Heat Recovery (WHR) and District Energy Systems (DES) in the Mid Atlantic area through education and technical support to more than 1,200 regional industry and government representatives in the region. The successful promotion of these technologies by the MACEAC was accomplished through the followingmore » efforts; (1)The MACEAC developed a series of technology transfer networks with State energy and environmental offices, Association of Energy Engineers local chapters, local community development organizations, utilities and, Penn State Department of Architectural Engineering alumni and their firms to effectively educate local practitioners about the energy utilization, environmental and economic advantages of CHP, WHR and DES; (2) Completed assessments of the regional technical and market potential for CHP, WHR and DE technologies application in the context of state specific energy prices, state energy and efficiency portfolio development. The studies were completed for Pennsylvania, New Jersey and Maryland and included a set of incentive adoption probability models used as a to guide during implementation discussions with State energy policy makers; (3) Using the technical and market assessments and adoption incentive models, the Mid Atlantic CEAC developed regional strategic action plans for the promotion of CHP Application technology for Pennsylvania, New Jersey and Maryland; (4) The CHP market assessment and incentive adoption model information was discussed, on a continuing basis, with relevant state agencies, policy makers and Public Utility Commission organizations resulting in CHP favorable incentive programs in New Jersey, Pennsylvania, Maryland and Delaware; (5) Developed and maintained a MACEAC website to provide technical information and regional CHP, WHR and DE case studies and site profiles for use by interested stakeholders in information transfer and policy discussions; (6) Provided Technical Assistance through feasibility studies and on site evaluations. The MACEAC completed 28 technical evaluations and 9 Level 1 CHP analyses ; and (7) the MACEAC provided Technical Education to the region through a series of 29 workshops and webinars, 37 technical presentations, 14 seminars and participation in 13 CHP conferences.« less
Reynolds, P A; Harper, J; Dunne, S; Cox, M; Myint, Y K
2007-04-28
To describe a simple technical evaluation of the access, security issues and uses of wireless networked PDAs in a dental clinic and report a pilot study investigating students' educational use of PDAs to access a Virtual Learning Environment (VLE) in a dental clinic. To undertake a technical evaluation of wireless networking to PDAs focusing on security issues, robustness of the system and accessibility particularly to educational resources. To evaluate the impact of using a PDA on undergraduate students in the dental clinic and at home. Part II describes the technical and educational evaluation of PDAs used by one group of 12 undergraduate fourth year students in the Primary Dental Care clinic. A cross over trial of six students with PDAs and six without was carried out during one semester of 12 weeks. Technical issues such as secure internet access using wireless connectivity were addressed. An assessment of the general and educational use and the students' attitudes towards using PDAs was undertaken using online questionnaires and focus group discussions. Over 90% of participants wanted PDAs as part of their dental kit. The potential of PDA use in dental training was demonstrated by a good to excellent response by over 75% of participants to having access to online support materials, particularly videos, being able to make notes for individual study and to keep a diary of their commitments to teaching sessions. Recreational use included a 100% good to excellent response to playing games and keeping a diary. The PDA proved to be a convenient and versatile mode of access to online education. Technical solutions enabled a substantial proportion of the functionality of WebCT (Web Course Tools) to be accessed by the students in a clinical environment. Both novice and experienced users were able to appreciate the use of the PDA and the less able considered that their ICT skills had improved. However, further research is needed to determine how students use a range of new technologies in their undergraduate programmes. The Dental Institute plans to recommend that all students will use this device in the future throughout their five-year curriculum, and the scoping of the implications of this recommendation is underway.
Morgan, Tara A; Jha, Priyanka; Poder, Liina; Weinstein, Stefanie
2018-04-09
Ultrasound is routinely used as the first imaging exam for evaluation of renal transplants and can identify most major surgical complications and evaluate vascularity with color Doppler. Ultrasound is limited, however, in the detection of parenchymal disease processes and Doppler evaluation is also prone to technical errors. Multiple new ultrasound applications have been developed and are under ongoing investigation which could add additional diagnostic capability to the routine ultrasound exam with minimal additional time, cost, and patient risk. Contrast-enhanced ultrasound (CEUS) can be used off-label in the transplant kidney, and can assist in detection of infection, trauma, and vascular complications. CEUS also can demonstrate perfusion of the transplant assessed quantitatively with generation of time-intensity curves. Future directions of CEUS include monitoring treatment response and microbubble targeted medication delivery. Elastography is an ultrasound application that can detect changes in tissue elasticity, which is useful to diagnose diffuse parenchymal disease, such as fibrosis, otherwise unrecognizable with ultrasound. Elastography has been successfully applied in other organs including the liver, thyroid, and breast; however, it is still under development for use in the transplant kidney. Unique properties of the transplant kidney including its heterogeneity, anatomic location, and other technical factors present challenges in the development of reference standard measurements. Lastly, B-flow imaging is a flow application derived from B-mode. This application can show the true lumen size of a vessel which is useful to depict vascular anatomy and bypasses some of the pitfalls of color Doppler such as demonstration of slow flow.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwantes, Jon M.
Founded in 1996 upon the initiative of the “Group of 8” governments (G8), the Nuclear Forensics International Technical Working Group (ITWG) is an ad hoc organization of official Nuclear Forensics practitioners (scientists, law enforcement, and regulators) that can be called upon to provide technical assistance to the global community in the event of a seizure of nuclear or radiological materials. The ITWG is supported by and is affiliated with nearly 40 countries and international partner organizations including the International Atomic Energy Agency (IAEA), EURATOM, INTERPOL, EUROPOL, and the United Nations Interregional Crime and Justice Research Institute (UNICRI) (Figure 1). Besidesmore » providing a network of nuclear forensics laboratories that are able to assist the global community during a nuclear smuggling event, the ITWG is also committed to the advancement of the science of nuclear forensic analysis, largely through participation in periodic table top and Collaborative Materials Exercises (CMXs). Exercise scenarios use “real world” samples with realistic forensics investigation time constraints and reporting requirements. These exercises are designed to promote best practices in the field and test, evaluate, and improve new technical capabilities, methods and techniques in order to advance the science of nuclear forensics. Past efforts to advance nuclear forensic science have also included scenarios that asked laboratories to adapt conventional forensics methods (e.g. DNA, fingerprints, tool marks, and document comparisons) for collecting and preserving evidence comingled with radioactive materials.« less
Multidisciplinary team simulation for the operating theatre: a review of the literature.
Tan, Shaw Boon; Pena, Guilherme; Altree, Meryl; Maddern, Guy J
2014-01-01
Analyses of adverse events inside the operating theatre has demonstrated that many errors are caused by failure in non-technical skills and teamwork. While simulation has been used successfully for teaching and improving technical skills, more recently, multidisciplinary simulation has been used for training team skills. We hypothesized that this type of training is feasible and improves team skills in the operating theatre. A systematic search of the literature for studies describing true multidisciplinary operating theatre team simulation was conducted in November and December 2012. We looked at the characteristics and outcomes of the team simulation programmes. 1636 articles were initially retrieved. Utilizing a stepwise evaluation process, 26 articles were included in the review. The studies reveal that multidisciplinary operating theatre simulation has been used to provide training in technical and non-technical skills, to help implement new techniques and technologies, and to identify latent weaknesses within a health system. Most of the studies included are descriptions of training programmes with a low level of evidence. No randomized control trial was identified. Participants' reactions to the training programme were positive in all studies; however, none of them could objectively demonstrate that skills acquired from simulation are transferred to the operating theatre or show a demonstrable benefit in patient outcomes. Multidisciplinary operating room team simulation is feasible and widely accepted by participants. More studies are required to assess the impact of this type of training on operative performance and patient safety. © 2013 Royal Australasian College of Surgeons.
View of Soviet ionospheric modification research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duncan, L.M.; Showen, R.L.
1990-10-01
We have reviewed and provided a technical assessment of Soviet research of the past five to ten years in ionospheric modification by high-power radio waves. This review includes a comprehensive survey of Soviet published literature, conference proceedings, and direct discussions with the involved Soviet researchers. The current state of the art for Soviet research in this field is evaluated, identifying areas of potential breakthrough discoveries, and discussing implications of this work for emerging technologies and future applications. This assessment is divided into the categories of basic research, advanced research, and applications. Basic research is further subdivided into studies of themore » modified natural geophysical environment, nonlinear plasma physics, and polar geophysical studies. Advanced research topics include the generation of artificial ionization mirrors and high-power oblique propagation effects. A separate comparative assessment of Soviet theoretical work also is included in this analysis. Our evaluation of practical and potential applications of this research discusses the utility of ionospheric modification in creating disturbed radio wave propagation environments, and its role in current and future remote-sensing and telecommunications systems. This technical assessment does not include consideration of ionospheric modification by means other than high-power radio waves. The Soviet effort in ionospheric modification sustains theoretical and experimental research at activity levels considerably greater than that found in comparable programs in the West. Notable strengths of the Soviet program are its breadth of coverage, large numbers of scientific participation, theoretical creativity and insight, and its powerful radio wave transmitting facilities.« less
Repeated Kicking Actions in Karate: Effect on Technical Execution in Elite Practitioners.
Quinzi, Federico; Camomilla, Valentina; Di Mario, Alberto; Felici, Francesco; Sbriccoli, Paola
2016-04-01
Training in martial arts is commonly performed by repeating a technical action continuously for a given number of times. This study aimed to investigate if the repetition of the task alters the proper technical execution, limiting the training efficacy for the technical evaluation during competition. This aim was pursued analyzing lower-limb kinematics and muscle activation during repeated roundhouse kicks. Six junior karate practitioners performed continuously 20 repetitions of the kick. Hip and knee kinematics and sEMG of vastus lateralis, biceps (BF), and rectus femoris were recorded. For each repetition, hip abduction-adduction and flexion-extension and knee flexion-extension peak angular displacements and velocities, agonist and antagonist muscle activation were computed. Moreover, to monitor for the presence of myoelectric fatigue, if any, the median frequency of the sEMG was computed. All variables were normalized with respect to their individual maximum observed during the sequence of kicks. Linear regressions were fitted to each normalized parameter to test its relationship with the repetition number. Linear-regression analysis showed that, during the sequence, the athletes modified their technique: Knee flexion, BF median frequency, hip abduction, knee-extension angular velocity, and BF antagonist activation significantly decreased. Conversely, hip flexion increased significantly. Since karate combat competitions require proper technical execution, training protocols combining severe fatigue and technical actions should be carefully proposed because of technique adaptations. Moreover, trainers and karate masters should consider including specific strength exercises for the BF and more generally for knee flexors.
48 CFR 2052.215-75 - Proposal presentation and format.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., i.e., competitive vs. noncompetitive, and the cost evaluation. (c) “Written Technical and Management... * copies. (1) The written Technical and Management Proposal or Oral Presentation and Supporting... objectives of this procurement. (3) The written Technical Proposal or Oral Presentation and Supporting...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-29
... NUCLEAR WASTE TECHNICAL REVIEW BOARD Board Workshop: June 6-7, 2011--Arlington, Virginia; the U.S. Nuclear Waste Technical Review Board Will Hold a Workshop on Methods for Evaluating Nuclear Waste Streams... 1987, the U.S. Nuclear Waste Technical Review Board will hold a workshop on Monday, June 6, and Tuesday...
NASA Technical Reports Server (NTRS)
Liu, Dahai; Goodrich, Kenneth H.; Peak, Bob
2010-01-01
This study investigated the effects of synthetic vision system (SVS) concepts and advanced flight controls on the performance of pilots flying a light, single-engine general aviation airplane. We evaluated the effects and interactions of two levels of terrain portrayal, guidance symbology, and flight control response type on pilot performance during the conduct of a relatively complex instrument approach procedure. The terrain and guidance presentations were evaluated as elements of an integrated primary flight display system. The approach procedure used in the study included a steeply descending, curved segment as might be encountered in emerging, required navigation performance (RNP) based procedures. Pilot performance measures consisted of flight technical performance, perceived workload, perceived situational awareness and subjective preference. The results revealed that an elevation based generic terrain portrayal significantly improved perceived situation awareness without adversely affecting flight technical performance or workload. Other factors (pilot instrument rating, control response type, and guidance symbology) were not found to significantly affect the performance measures.
NASA Technical Reports Server (NTRS)
1976-01-01
All possible overall system configurations, operating modes, and subsystem concepts for a wind turbine configuration for cost effective generation of electrical power were evaluated for both technical feasibility and compatibility with utility networks, as well as for economic attractiveness. A design optimization computer code was developed to determine the cost sensitivity of the various design features, and thus establish the configuration and design conditions that would minimize the generated energy costs. The preliminary designs of both a 500 kW unit and a 1500 kW unit operating in a 12 mph and 18 mph median wind speed respectively, were developed. The various design features and components evaluated are described, and the rationale employed to select the final design configuration is given. All pertinent technical performance data and component cost data is included. The costs of all major subassemblies are estimated and the resultant energy costs for both the 500 kW and 1500 kW units are calculated.
Pulp fiction - The volunteer concept (or how not to site additional LLRW disposal capacity)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burton, D.A.
1995-12-31
Experiences of compacts and of individual states throughout the nation indicate that low-level radioactive waste disposal siting processes, based from the beginning upon the volunteer concept are fraught with problems. Most apparent among these problems is that the volunteer concept does not lead to scientifically and technically based siting endeavors. Ten years have passed since the Amendments Act of 1985, and no compact or state has been - successful in providing for new LLRW disposal capacity. That failure can be traced in part to the reliance upon the volunteer concept in siting attempts. If success is to be achieved, themore » future direction for LLRW management must focus on three areas: first, a comprehensive evaluation of all LLRW management options, including reduction of waste generated and on-site storage; secondly, a comprehensive evaluation of the current as well as projected waste stream, to determine the amount of disposal capacity actually needed; and, finally, sound scientifically and technically based siting processes.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Monteleone, S.
1998-03-01
This three-volume report contains papers presented at the conference. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Japan, Norway, and Russia. The titles of the papers and the names of the authors have been updated and may differ from those that appeared in the final program of the meeting. This volume contains the following: (1) human reliability analysis and human performance evaluation; (2) technical issues relatedmore » to rulemakings; (3) risk-informed, performance-based initiatives; and (4) high burn-up fuel research. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Birdsell, Kay Hanson; Stauffer, Philip H.; French, Sean B.
Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research. Environmental restoration (ER), and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. This special analysis, SA 2017-001, evaluates the potential impacts of disposing of this waste in Pit 38 atmore » Area G based on the assumptions that form the basis of the Area G PA/CA. Section 2 describes the methods used to conduct the analysis; the results of the evaluation are provided in Section 3; and conclusions and recommendations are provided in Section 4.« less
Moreno, Pedro A; Hernando, M Elena; Gómez, Enrique J
2015-01-01
The progressive ageing of population has turned the mild cognitive impairment (MCI) into a prevalent disease suffered by elderly. Consequently, the spatial disorientation has become a significant problem for older people and their caregivers. The ambient-assisted living applications are offering location-based services for empowering elderly to go outside and encouraging a greater independence. Therefore, this paper describes the design and technical evaluation of a location-awareness service enabler aimed at supporting and managing probable wandering situations of a person with MCI. Through the presence capabilities of the IP multimedia subsystem (IMS) architecture, the service will alert patient's contacts if a hazardous situation is detected depending on his location. Furthermore, information about the older person's security areas has been included in the user profile managed by IMS. In doing so, the service enabler introduced contribute to "context-awareness" paradigm allowing the adaptation and personalization of services depending on user's context and specific conditions or preferences.
Design and evaluation of low cost blades for large wind driven generating systems
NASA Technical Reports Server (NTRS)
Eggert, W. S.
1982-01-01
The development and evaluation of a low cost blade concept based on the NASA-Lewis specifications is discussed. A blade structure was designed and construction methods and materials were selected. Complete blade tooling concepts, various technical and economic analysis, and evaluations of the blade design were performed. A comprehensive fatigue test program was conducted to provide data and to verify the design. A test specimen of the spar assembly, including the root end attachment, was fabricated. This is a full-scale specimen of the root end configuration, 20 ft long. A blade design for the Mod '0' system was completed.
ERIC Educational Resources Information Center
HARRIS, JAMES N.; SHERARD, AUSTELL O.
THIRTY-NINE TRADE AND INDUSTRIAL AND VOCATIONAL TECHNICAL TEACHERS AND SUPERVISORS FROM 19 STATES PARTICIPATED IN A WORKSHOP TO PLAN AND EXECUTE A COMPREHENSIVE EXAMINATION AND EVALUATION OF THE COOPERATIVE WORK EXPERIENCE PLAN OF EDUCATION RELATIVE TO TRADE AND INDUSTRIAL EDUCATION. THE WORKSHOP ORGANIZATION INCLUDED CONSULTANT PRESENTATIONS,…
Aeronautical engineering: A continuing bibliography with indexes (supplement 119)
NASA Technical Reports Server (NTRS)
1980-01-01
This bibliography lists 341 reports, articles, and other documents introduced into the NASA scientific and technical information system in January 1980. Abstracts on the engineering and theoretical aspects of design, construction, evaluation, testing, operation, and performance of aircraft (including aircraft engines) and associated components, equipment, and systems are presented. Research and development in aerodynamics, aeronautics, and ground support equipment for aeronautical vehicles are also presented.
2011-12-01
Personnel Trends Relevant to Policy, 1993–2006. Santa Monica, CA: RAND Corporation/TR-572-OSD, by Gates, Susan M., Edward G. Keating , Adria D...settlement of contracts and subcontracts. Duties include evaluating information about contractor economic assertions, comparing those assertions to...Quality, and Manufacturing Acquisition-related manufacturing and production duties vary greatly in managerial , administrative, and technical
ERIC Educational Resources Information Center
SEGARRA, CARLOS O.
THE PURPOSE OF THE PROJECT WAS TO IDENTIFY AND DEFINE THE PARAMETERS OF AN ECONOMICAL AND PRACTICAL INFORMATION SYSTEM FOR THE U.S. ARMY ENGINEER RESEARCH AND DEVELOPMENT LABORATORIES. THE PROGRAM INCLUDED FOUR PHASES--(1) DATA REQUIREMENTS DEFINITION, (2) COST ANALYSIS AND SYSTEM DEFINITION, (3) HARDWARE SELECTION, SYSTEM TEST AND EVALUATION, AND…
Can treatment and disposal costs be reduced through metal recovery?
Smith, Kathleen S.; Figueroa, Linda; Plumlee, Geoffrey S.
2015-01-01
This paper describes a framework to conduct a “metal-recovery feasibility assessment” for mining influenced water (MIW) and associated treatment sludge. There are multiple considerations in such a determination, including the geologic/geochemical feasibility, market feasibility, technical feasibility, economic feasibility, and administrative feasibility. Each of these considerations needs to be evaluated to determine the practicality of metal recovery from a particular MIW.
ERIC Educational Resources Information Center
Alford, Elisabeth; And Others
A pilot project tested and evaluated teleconferencing as a medium for training engineering teaching assistants in technical writing. The teleconference, which linked 15 participants in the engineering departments and writing centers of the University of South Carolina and Ohio State University, also included a training session on the use of genre…
ERIC Educational Resources Information Center
Lewis, Anne
This report outlines the major themes of the 2000 annual conference of the Center for Research on Evaluation, Standards, and Student Testing (CRESST), which focused on educational accountability in the 21st century. The conference opened with a panel presentation on the Texas accountability system. This session included a presentation by one of…
Unintended Consequences of Tele Health and their Possible Solutions
Maeder, A.; Mars, M.; Hartvigsen, G.; Basu, A.; Abbott, P.
2016-01-01
Summary Objectives Assess unforeseen consequences of Telehealth and suggest solutions Methods An outline was created collecting all possible ill effects classified into Clinical considerations, Administrative concerns including interpersonal relations, Technical issues, Legal / Ethical concerns and Miscellaneous. Each topic was assigned to a particular WG member to lead, gather opinion and review existing literature. Results and Conclusion A wide array of problems have been described. Except for technical issues, literature on this topic is scant, so this article is based more on personal experience and data collected from surveys. Much can be done to prevent such problems, such as a need for standardization with related clinical studies for devices as well as processes used for telehealth is underlined, besides evaluation of outcomes of projects undertaken. PMID:27830229
Progress report on CCIR studies for guaranteeing access to the geostationary satellite orbit
NASA Astrophysics Data System (ADS)
Reinhart, E. E.
Overall responsibility for preparing a report on the technical information necessary for the World Administrative Radio Conference to be held in the spring of 1984 is vested in the Interim Working Party (IWP) 4/1. The various approaches being considered by the IWP 4/1 to guarantee orbital access are described, along with the criteria that the party has proposed for evaluating and comparing the approaches. These approaches include the following: a regional detailed long-term (10-20 years) a priori allotment plan, a periodically revised (3-5 years) regional detailed allotment plan, a regional or subregional allotment plan with guaranteed access, guaranteed access by means of multilateral coordination, and coordination procedures and technical factors that are revised periodically.
Far-Infrared Heterodyne Spectrometer for Sofia
NASA Technical Reports Server (NTRS)
Betz, A. L.
1998-01-01
The project goal was to evaluate the scientific capabilities and technical requirements for a far-infrared heterodyne spectrometer suitable for the SOFIA Airborne Observatory, which is now being developed by NASA under contract to the Universities Space Research Association (USRA). The conclusions detailed below include our specific recommendations for astronomical observations, as well as our intended technical approach for reaching these scientific goals. These conclusions were presented to USRA in the form of a proposal to build this instrument. USRA subsequently awarded the University of Colorado a 3-year grant to develop the proposed Hot-Electron micro-Bolometer (HEB) mixer concept for high frequencies above 3 THz, as well as other semiconductor mixer technologies suitable for high sensitivity receivers in the 2-6 THz frequency band.
Mercury in the Soil of the Tunka Depression
NASA Astrophysics Data System (ADS)
Lyapina, E. E.; Cherkashina, A. A.
2018-01-01
The work evaluates the general distribution of mercury in the soil cover of the Tunkinskaya depression (the Republic of Buryatia, the national park "Tunkinsky"). For this purpose, its gross contents in natural and agrogenically transformed soils were studied: plow lands, fallow lands, hayfields and pastures. The physico-technical characteristics of soils, the content of organic carbon, group composition of humus are determined. The method of processing the results included the calculation of the ecological and geochemical parameters: the concentration coefficient relative to the background, MAC, Clark concentration relative to the Earth’s crust, the Earth’s soils, the identification of the relationship with the physical and technical characteristics of the soil, and the content of C02, CO2 carbonates, fulvic and humic acids.
Enhancement of the Probabilistic CEramic Matrix Composite ANalyzer (PCEMCAN) Computer Code
NASA Technical Reports Server (NTRS)
Shah, Ashwin
2000-01-01
This report represents a final technical report for Order No. C-78019-J entitled "Enhancement of the Probabilistic Ceramic Matrix Composite Analyzer (PCEMCAN) Computer Code." The scope of the enhancement relates to including the probabilistic evaluation of the D-Matrix terms in MAT2 and MAT9 material properties card (available in CEMCAN code) for the MSC/NASTRAN. Technical activities performed during the time period of June 1, 1999 through September 3, 1999 have been summarized, and the final version of the enhanced PCEMCAN code and revisions to the User's Manual is delivered along with. Discussions related to the performed activities were made to the NASA Project Manager during the performance period. The enhanced capabilities have been demonstrated using sample problems.
Design for effective development and prototyping of the HL-20
NASA Astrophysics Data System (ADS)
Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.
1993-10-01
A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.
Latkovich, V.J.; Tracey, Debra C.
1994-01-01
The Hydrologic lnstrumentation Facility (HIF) of the U.S. Geological Survey (USGS) has nationwide responsibility for all aspects of hydrologic field instrumentation in support of Survey data-collection programs. Each year the HIF publishes a report to inform Water Resources Division (WRD) personnel of progress made by the HIF in fulfilling its mission to improve instrumentation services to the Division. The report for fiscal year 1993 (FY93) describes the activities of the HIF, including major accomplish- ments for the year; personnel actions; active projects (reported by section--Technical Services Section, Administrative Services Section, Field Coordination, Applications and Development Section, Test and Evaluation Section, Field Service and Supply Section); and planned activities for the coming year. Also presented in the appendixes are detailed listings of the memberships of the Instrumentation Committee and the Instrumentation Technical Advisory Subcommittee; district, sub- district, and field office visits by HIF personnel; professional and technical meetings attended by HIF personnel; vendor visits; and reports prepared by HIF personnel.
Rivas-Cantu, Raul C; Jones, Kim D; Mills, Patrick L
2013-04-01
An assessment of recent technical advances on pretreatment processes and its effects on enzymatic hydrolysis as the main steps of a proposed citrus processing waste (CPW) biorefinery is presented. Engineering challenges and relevant gaps in scientific and technical information for reliable design, modeling and scale up of a CPW biorefinery are also discussed. Some integrated physico-chemical pretreatments are proposed for testing for CPW, including high speed knife-grinding and simultaneous caustic addition. These new proposed processes and the effect of parameters such as particle size, surface area and morphology, pore volume and chemical composition of the diverse fractions resulting from pretreatment and enzymatic hydrolysis need to be evaluated and compared for pretreated and untreated samples of grapefruit processing waste. This assessment suggests the potential for filling the data gaps, and preliminary results demonstrate that the reduction of particle size and the increased surface area for the CPW will result in higher reaction rates and monosaccharide yields for the pretreated waste material.