Sample records for technical overview contractor

  1. The Franco-German DBS program 'TV-SAT/TDF-1'

    NASA Astrophysics Data System (ADS)

    Arnim, R.

    Governmental authorities of Germany and France have jointly awarded a contract to industry for two DBS satellites, to be launched in 1985, which will then serve Germany and France with direct-to-home broadcasting. This paper provides an overview of the background of the Franco-German program, the scope of the program, its technical baseline and configuration, its delivery schedule, its present status, and information on the customer and contractor side.

  2. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  3. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established... procedures for protecting technical data delivered to or stored at the repository from unauthorized release... disclosure of technical data from the repository to third parties consistent with the Government's rights in...

  4. 48 CFR 227.7103-11 - Contractor procedures and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Rights in Technical Data 227.7103-11 Contractor procedures and records. (a) The clause at 252.227-7013, Rights in Technical Data—Noncommercial Items, requires a contractor, and its subcontractors or suppliers that will deliver technical data with other than unlimited rights, to establish and follow written...

  5. 77 FR 52698 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... training equipment, publications and technical data, U.S. Government and contractor technical and logistics personnel services and other related elements of program and logistics support. (iv) Military Department..., publications and technical data, U.S. Government and contractor technical and logistics personnel services and...

  6. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section III, Block 19, generally mean— (A) Technical capability. An assessment of the prospective contractor's key management personnel to determine if they have the basic technical knowledge, experience... completion. This includes— (1) An assessment of the prospective contractor's possession of, or the ability to...

  7. 48 CFR 1052.201-70 - Contracting Officer's Technical Representative (COTR) Designation and Authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in writing. The term “technical direction” includes, without limitation, direction to the contractor... the actions of the contractor's employees. (d) Technical direction may be oral or in writing. The COTR... Technical Representative (COTR) Designation and Authority. 1052.201-70 Section 1052.201-70 Federal...

  8. Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments

    DTIC Science & Technology

    2010-08-16

    contractors].”). 17 48 C.F.R. § 9.402(b) (“The serious nature of debarment and suspension requires that these sanctions be imposed only in the public...CRS Report for Congress Prepared for Members and Committees of Congress Debarment and Suspension of Government Contractors: An Overview...control number. 1. REPORT DATE 16 AUG 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Debarment and Suspension

  9. 48 CFR 227.7103-10 - Contractor identification and marking of technical data to be furnished with restrictive markings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and marking of technical data to be furnished with restrictive markings. 227.7103-10 Section 227.7103... DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-10 Contractor identification and marking of technical data to be furnished with restrictive markings...

  10. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  11. 40 CFR 35.4215 - What if my group can't find an adequate number of potential sources for a technical advisor or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... number of potential sources for a technical advisor or other contractor? 35.4215 Section 35.4215... ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4215 What if my group can't find an adequate number of potential sources for a technical advisor...

  12. 40 CFR 35.4205 - How does my group procure a technical advisor or any other contractor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How does my group procure a technical... PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4205 How does my group...

  13. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  14. 48 CFR 742.1170-4 - Progress reporting requirements and contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...

  15. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  16. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  17. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  18. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  19. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  20. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  1. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  2. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  3. 76 FR 68429 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... documentation, U.S. Government and contractor engineering, technical, and logistics personnel support services, and other related elements of logistics support. (iv) Military Department: Navy (USMC) (SDH). (v.... Government and contractor engineering, technical, and logistics personnel [[Page 68432

  4. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2015-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  5. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2014-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  6. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  7. NASA's Exploration Technology Development Program Energy Storage Project Battery Technology Development

    NASA Technical Reports Server (NTRS)

    Reid, Concha M.; Miller, Thomas B.; Mercer, Carolyn R.; Jankovsky, Amy L.

    2010-01-01

    Technical Interchange Meeting was held at Saft America s Research and Development facility in Cockeysville, Maryland on Sept 28th-29th, 2010. The meeting was attended by Saft, contractors who are developing battery component materials under contracts awarded through a NASA Research Announcement (NRA), and NASA. This briefing presents an overview of the components being developed by the contractor attendees for the NASA s High Energy (HE) and Ultra High Energy (UHE) cells. The transition of the advanced lithium-ion cell development project at NASA from the Exploration Technology Development Program Energy Storage Project to the Enabling Technology Development and Demonstration High Efficiency Space Power Systems Project, changes to deliverable hardware and schedule due to a reduced budget, and our roadmap to develop cells and provide periodic off-ramps for cell technology for demonstrations are discussed. This meeting gave the materials and cell developers the opportunity to discuss the intricacies of their materials and determine strategies to address any particulars of the technology.

  8. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  9. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  10. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  11. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  12. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  13. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  14. 78 FR 36538 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... training equipment, U.S. Government and contractor engineering, technical and logistics support services... equipment, U.S. Government and contractor engineering, technical and logistics support services, and other... central government and the country's outlying areas. The sale of these C-130Js to Libya will significantly...

  15. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less

  16. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23... feasibility study yourself or though a contractor, Reclamation will evaluate whether you, your technical staff, or contractor are qualified to perform the appraisal investigation or feasibility study based on...

  17. 77 FR 32129 - Notice of Proposed Information Collection; Comment Request: Multifamily Contractor's/Mortgagor's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... Information Collection; Comment Request: Multifamily Contractor's/Mortgagor's Cost Breakdowns and..., Technical Support, Office of Multifamily Housing Development, Department of Housing and Urban Development... also lists the following information: Title of Proposal: Multifamily Contractor's/Mortgagor's Cost...

  18. Engineering the System and Technical Integration

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.

    2011-01-01

    Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    No, author

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors inmore » Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.« less

  20. Predictive Engineering Implementation at KSC

    NASA Technical Reports Server (NTRS)

    Mosconi, Jane; Schafer, Loraine

    1995-01-01

    This paper provides an overview of what the primary contractors at Kennedy Space Center (KSC) are doing in the field of predictive engineering. The technologies employed by each of the contractors and the cost savings associated with the implementation of these predictive engineering methods are discussed. The sources include predictive engineering implementation plans, published by each of the contractors and interviews with the authors of these implementation plans.

  1. Scientific and Technical Information Output of the Langley Research Center, for calendar year 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Documents listed include NASA Technical Reports, Technical Notes, Technical Memorandums, Special Publications, Contractor Reports, journal articles, and technical presentations made at Society meetings. NASA formal reports listed are those that were mailed and distributed to the ultimate user. The material presented here is listed first by Division and then under the following headings: (a) Formal Reports, (b) Contractor Reports, (c) Articles and Meeting Presentations, and (d) High Number Technical Memorandums (High TMX's). Under each heading, the material cited authors in alphabetical order. If a report has more than one author and these authors are from different Divisions, the report is listed only once, under the senior author's name.

  2. 23 CFR 230.204 - Implementation of supportive services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... majority and minority contractors, contractors' associations, minority groups, and other persons or..., such as technical assistance, managerial assistance, counseling, certification assistance, and follow...

  3. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  4. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  5. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  6. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  7. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  8. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  9. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  10. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  11. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  12. 48 CFR 209.570-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prospective contractor meets the definition of “lead system integrator”; (2) Consider all information... workforce or a system engineering and technical assistance contractor; (2) Shall include a plan for phasing...

  13. 48 CFR 245.603-70 - Contractor performance of plant clearance duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government-furnished property from inventory schedules; (v) Evaluate physical, quantitative, and technical allocability of contractor inventory prior to disposal using Standard Form 1423, Inventory Verification Survey...

  14. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  15. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  16. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  17. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  18. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  19. 48 CFR 209.505-4 - Obtaining access to proprietary information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) For contractors accessing third party proprietary technical data or computer software, non-disclosure... limited rights technical data, commercial technical data, or restricted rights computer software. The...

  20. Fiscal year 1979 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1979-01-01

    This bibliography lists approximately 590 formal NASA technical reports, papers published in technical journals, presentations by MSFC personnel, and reports of MSFC contractors introduced into the NASA scientific and technical information system in 1979.

  1. 48 CFR 252.204-7015 - Disclosure of Information to Litigation Support Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Information to Litigation Support Contractors (FEB 2014) (a) Definitions. As used in this clause: Litigation..., financial, proprietary, or privileged nature. The term includes technical data and computer software, but...

  2. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Does not obtain an unfair competitive advantage over other parties by virtue of its performance of this... technical bias or unfair competitive advantage. (d) Disclosure after award. (1) The contractor warrants that...

  3. An Overview of the Performance of the Chandra X-ray Observatory

    NASA Technical Reports Server (NTRS)

    Weisskopf, M. C.; Aldcroft, T. L.; Bautz, M.; Cameron, R. A.; Dewey, D.; Drake, J. J.; Grant, C. E.; Marshall, H. L.; Murray, S. S.

    2004-01-01

    The Chandra X-ray Observatory is the X-ray component of NASA's Great Observatory Program which includes the recently launched Spitzer Infrared Telescope, the Hubble Space Telescope (HST) for observations in the visible, and the Compton Gamma-Ray Observatory (CGRO) which, after providing years of useful data has reentered the atmosphere. All these facilities provide, or provided, scientific data to the international astronomical community in response to peer-reviewed proposals for their use. The Chandra X-ray Observatory was the result of the efforts of many academic, commercial, and government organizations primarily in the United States but also in Europe. NASA s Marshall Space Flight Center (MSFC) manages the Project and provides Project Science; Northrop Grumman Space Technology (NGST - formerly TRW) served as prime contractor responsible for providing the spacecraft, the telescope, and assembling and testing the Observatory; and the Smithsonian Astrophysical Observatory (SAO) provides technical support and is responsible for ground operations including the Chandra X-ray Center (CXC). Telescope and instrument teams at SAO, the Massachusetts Institute of Technology (MIT), the Pennsylvania State University (PSU), the Space Research Institute of the Netherlands (SRON), the Max-Planck Institut fur extraterrestrische Physik (MPE), and the University of Kiel support also provide technical support to the Chandra Project. We present here a detailed description of the hardware, its on-orbit performance, and a brief overview of some of the remarkable discoveries that illustrate that performance.

  4. Overview of NASA Langley's Systems Analysis Capabilities

    NASA Technical Reports Server (NTRS)

    Cavanaugh, Stephen; Kumar, Ajay; Brewer, Laura; Kimmel, Bill; Korte, John; Moul, Tom

    2006-01-01

    The Systems Analysis and Concepts Directorate (SACD) has been in the systems analysis business line supporting National Aeronautics and Space Administration (NASA) aeronautics, exploration, space operations and science since the 1960 s. Our current organization structure is shown in Figure 1. SACD mission can be summed up in the following statements: 1. We conduct advanced concepts for Agency decision makers and programs. 2. We provide aerospace systems analysis products such as mission architectures, advanced system concepts, system and technology trades, life cycle cost and risk analysis, system integration and pre-decisional sensitive information. 3. Our work enables informed technical, programmatic and budgetary decisions. SACD has a complement of 114 government employees and approximately 50 on-site contractors which is equally split between supporting aeronautics and exploration. SACD strives for technical excellence and creditability of the systems analysis products delivered to its customers. The Directorate office is continuously building market intelligence and working with other NASA centers and external partners to expand our business base. The Branches strive for technical excellence and credibility of our systems analysis products by seeking out existing and new partnerships that are critical for successful systems analysis. The Directorates long term goal is to grow the amount of science systems analysis business base.

  5. Use of Coatings on Hydraulic Steel Structures: Part 1-Overview and Field Survey

    DTIC Science & Technology

    2016-09-01

    stripped out the coating. • On a gate, a contractor didn’t follow the specifications in the area of the rivets, leading to premature failure of...the coating. • On another gate, where polyurea was applied, the contractor missed the recoat window and unfortunately, the contractor was not forced...epaact1992controlofvocemissionsdistributionregssi374of1997. ht ml. Jackson, Joshua E. 2016. “Cost of Corrosion Annually in the U.S. Over $1.1 Trillion in

  6. FY 1986 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1986-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY-86 are presented. Also included are papers of MSFC contractors.

  7. FY 1980 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1980-01-01

    Abstracts are presented for 60 technical memoranda and 5 technical papers published in technical journals or presented by MSFC personnel in FY 1980. Conference and reference publications are cited along with contractor reports and papers cleared for presentation.

  8. FY 1984 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, J. E. (Compiler)

    1984-01-01

    This bibliography lists formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel. Abstracts are presented for 56 technical memorandum, and 13 technical papers. Six publications, over 260 contractor reports, and more than 300 papers cleared for publication are cited.

  9. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  10. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  11. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  12. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  13. NASA Langley Scientific and Technical Information Output: 1998

    NASA Technical Reports Server (NTRS)

    Machie, Harriet B. (Compiler); Stewart, Susan H. (Compiler)

    1999-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1998. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  14. NASA Langley Scientific and Technical Information Output-2001

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2002-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the 2001 calendar year. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  15. NASA Langley Scientific and Technical Information Output-2002

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2003-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2002. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  16. Software Engineering for Human Spaceflight

    NASA Technical Reports Server (NTRS)

    Fredrickson, Steven E.

    2014-01-01

    The Spacecraft Software Engineering Branch of NASA Johnson Space Center (JSC) provides world-class products, leadership, and technical expertise in software engineering, processes, technology, and systems management for human spaceflight. The branch contributes to major NASA programs (e.g. ISS, MPCV/Orion) with in-house software development and prime contractor oversight, and maintains the JSC Engineering Directorate CMMI rating for flight software development. Software engineering teams work with hardware developers, mission planners, and system operators to integrate flight vehicles, habitats, robotics, and other spacecraft elements. They seek to infuse automation and autonomy into missions, and apply new technologies to flight processor and computational architectures. This presentation will provide an overview of key software-related projects, software methodologies and tools, and technology pursuits of interest to the JSC Spacecraft Software Engineering Branch.

  17. A bootstrap lunar base: Preliminary design review 2

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A bootstrap lunar base is the gateway to manned solar system exploration and requires new ideas and new designs on the cutting edge of technology. A preliminary design for a Bootstrap Lunar Base, the second provided by this contractor, is presented. An overview of the work completed is discussed as well as the technical, management, and cost strategies to complete the program requirements. The lunar base design stresses the transforming capabilities of its lander vehicles to aid in base construction. The design also emphasizes modularity and expandability in the base configuration to support the long-term goals of scientific research and profitable lunar resource exploitation. To successfully construct, develop, and inhabit a permanent lunar base, however, several technological advancements must first be realized. Some of these technological advancements are also discussed.

  18. Component technology for stirling power converters

    NASA Technical Reports Server (NTRS)

    Thieme, Lanny G.

    1991-01-01

    NASA Lewis Research Center has organized a component technology program as part of the efforts to develop Stirling converter technology for space power applications. The Stirling Space Power Program is part of the NASA High Capacity Power Project of the Civil Space Technology Initiative (CSTI). NASA Lewis is also providing technical management for the DOE/Sandia program to develop Stirling converters for solar terrestrial power producing electricity for the utility grid. The primary contractors for the space power and solar terrestrial programs develop component technologies directly related to their goals. This Lewis component technology effort, while coordinated with the main programs, aims at longer term issues, advanced technologies, and independent assessments. An overview of work on linear alternators, engine/alternator/load interactions and controls, heat exchangers, materials, life and reliability, and bearings is presented.

  19. Solar 101 Webinar Series: Solar Technical Assistance Overview and

    Science.gov Websites

    Technical Assistance Overview and Applications Solar 101 Webinar Series: Solar Technical Assistance Overview and Applications Wednesday, March 5, 2014, 2-3 p.m. EST NREL's Solar Technical Assistance Team (STAT ) presented a live webinar titled, "Solar Technical Assistance Overview and Applications." This

  20. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...

  1. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...

  2. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  3. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  4. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  5. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  6. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  7. NASA Langley Scientific and Technical Information Output 2000

    NASA Technical Reports Server (NTRS)

    Machie, Harriet B. (Compiler); Stewart, Susan H. (Compiler)

    2001-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2000. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandum, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

  8. NASA Langley Scientific and Technical Information Output?2003

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2004-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2003. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  9. NASA Langley Scientific and Technical Information Output: 1999

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Machie, Harriet (Compiler)

    2000-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1999. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

  10. The Study of the Phase Characteristics of Bragg Cells for Acousto-Optic Signal Processing

    DTIC Science & Technology

    1998-01-01

    contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical parameters. Design a...Braggcell TeO2 with minimal phase distortions operating near 100 MHz. Experimentally investigate the phase characteristics for a Bragg cell on TeO2 ...follows: The contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical

  11. 48 CFR 9.502 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.502 Applicability. (a) This... limited to any particular kind of acquisition. However, organizational conflicts of interest are more... professional services; (3) Contractor performance of or assistance in technical evaluations; or (4) Systems...

  12. Issues With Access to Acquisition Data and Information in the Department of Defense

    DTIC Science & Technology

    2017-01-01

    both procurement and operations), technical performance, contracts and contractor performance, and program decision memo- randa. These data are...the cost of weapon systems (both procurement and operations), techni- cal performance, contracts and contractor performance, and program decision...and tracking sensitive data, and 19 percent have no method at all (Trustwave, 2014, p. 4; Kerner, 2014). U.S. defense contractors face similar

  13. Fiscal year 1981 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Thacker, S. S. (Compiler)

    1981-01-01

    This bibliography lists approximately 503 formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY-1981. It also includes papers of MSFC contractors. Citations announced in the NASA scientific and technical information system are noted.

  14. 48 CFR 2052.216-72 - Task order procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...; (5) Technical skills required; and (6) Estimated level of effort. (b) Task order technical proposal. By the date specified in the TORFP, the contractor shall deliver to the contracting officer a written or verbal (as specified in the TORFP technical proposal submittal instructions) technical proposal...

  15. 78 FR 70569 - Technical Mapping Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID: FEMA-2013-0039] Technical Mapping Advisory Council AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice... Technical Mapping Advisory Council (TMAC). The notice incorrectly stated that contractors and potential...

  16. 76 FR 40707 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... training and training equipment, support equipment, U.S. Government and contractor engineering, logistics... training equipment, support equipment, U.S. Government and contractor engineering, logistics, and technical... access to SSEE Increment F services via standard Service Oriented Architecture (SOA) interfaces via...

  17. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  18. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  19. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  20. Fingerprinting of Materials: Technical Supplement

    NASA Technical Reports Server (NTRS)

    Workman, Gary L.

    1992-01-01

    This supplement to the Guidelines for Maintaining a Chemical Fingerprinting Program has been developed to assist NASA personnel, contractors, and sub-contractors in defining the technical aspects and basic concepts which can be used in chemical fingerprinting programs. This material is not meant to be totally inclusive to all chemical fingerprinting programs, but merely to present current concepts. Each program will be tailored to meet the needs of the individual organizations using chemical fingerprinting to improve their quality and reliability in the production of aerospace systems.

  1. Scientific and technical information output of the Langley Research Center

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Scientific and technical information that the Langley Research Center produced during the calendar year 1983 is compiled. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  2. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  3. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  4. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  5. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  6. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract. (d) All technical direction shall be issued in writing by the COR. (e) The Contractor must... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  7. 48 CFR 1852.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Direction (SEP 1993) (a) Performance of the work under this contract is subject to the written technical... the Contracting Officer in writing in accordance with NASA FAR Supplement 1842.270. “Technical... in writing by the COTR. (d) The Contractor shall proceed promptly with the performance of technical...

  8. Information Technology and the Human Research Facility

    NASA Technical Reports Server (NTRS)

    Klee, Margaret

    2002-01-01

    This slide presentation reviews how information technology supports the Human Research Facility (HRF) and specifically the uses that contractor has for the information. There is information about the contractor, the HRF, some of the experiments that were performed using the HRF on board the Shuttle, overviews of the data architecture, and software both commercial and specially developed software for the specific experiments.

  9. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  10. 10 CFR 436.33 - Procedures and methods for contractor selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for contractor selection. (a) Competitive selection. Competitive selections based on solicitation of... synopsizes the proposed contract action. (2) Each competitive solicitation— (i) Shall request technical and... from those within the competitive range. (b) Unsolicited proposals. Federal agencies may— (1) Consider...

  11. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  12. Advanced Technology Composite Fuselage: Program Overview

    NASA Technical Reports Server (NTRS)

    Ilcewicz, L. B.; Smith, P. J.; Hanson, C. T.; Walker, T. H.; Metschan, S. L.; Mabson, G. E.; Wilden, K. S.; Flynn, B. W.; Scholz, D. B.; Polland, D. R.; hide

    1997-01-01

    The Advanced Technology Composite Aircraft Structures (ATCAS) program has studied transport fuselage structure with a large potential reduction in the total direct operating costs for wide-body commercial transports. The baseline fuselage section was divided into four 'quadrants', crown, keel, and sides, gaining the manufacturing cost advantage possible with larger panels. Key processes found to have savings potential include (1) skins laminated by automatic fiber placement, (2) braided frames using resin transfer molding, and (3) panel bond technology that minimized mechanical fastening. The cost and weight of the baseline fuselage barrel was updated to complete Phase B of the program. An assessment of the former, which included labor, material, and tooling costs, was performed with the help of design cost models. Crown, keel, and side quadrant cost distributions illustrate the importance of panel design configuration, area, and other structural details. Composite sandwich panel designs were found to have the greatest cost savings potential for most quadrants. Key technical findings are summarized as an introduction to the other contractor reports documenting Phase A and B work completed in functional areas. The current program status in resolving critical technical issues is also highlighted.

  13. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  14. 40 CFR 35.4190 - How does my group identify a qualified technical advisor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... technical advisor? 35.4190 Section 35.4190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4190 How does my group identify a qualified...

  15. Naval Training Device Center Index of Technical Reports.

    ERIC Educational Resources Information Center

    Walker, Lemuel E.

    Published Naval Training Device Center technical reports and some technical notes (those available through the Defense Documentation Center-DDC) which have resulted from basic research, exploratory development, and advanced development type projects are listed. The reports are indexed by technical note number, by title, and by contractor code. The…

  16. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  17. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  18. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  19. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  20. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  1. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... directive whatever. (d) All technical directions must be issued in writing by the project officer or must be... advise the contractor in writing that, in the contracting officer's opinion, the technical direction is... subject to the technical direction of the NRC project officer. The term technical direction is defined to...

  2. NASA Langley Scientific and Technical Information Output: 1997

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Machie, Harriet B. (Compiler)

    1998-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1997. Included are citations for Formal Reports, Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  3. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b) Technical personnel shall conduct a comprehensive review of VECPs for technical feasibility, usefulness, and adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  4. RADON REDUCTION TECHNIQUES FOR DETACHED HOUSES, TECHNICAL GUIDANCE (SECOND EDITION)

    EPA Science Inventory

    This document is intended for use by State officials, radon mitigation contractors, building contractors, concerned homeowners, and other persons as an aid in the selection, design, and operation of radon reduction measurements for houses. It is the second edition of EPA's techn...

  5. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) andmore » subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.« less

  6. 48 CFR 209.505-4 - Obtaining access to proprietary information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Non-disclosure requirements for contractors accessing third party proprietary technical data or... may be required to enter into non-disclosure agreements directly with the third party asserting restrictions on limited rights technical data, commercial technical data, or restricted rights computer...

  7. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  8. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  9. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  10. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  11. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  12. Scientific and technical information output of the Langley Research Center for Calendar Year 1985

    NASA Technical Reports Server (NTRS)

    1986-01-01

    A compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1985 is presented. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  13. Scientific and technical information output of the Langley Research Center for calendar year 1984

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The scientific and technical information that the Langley Research Center produced during the calendar year 1984 is compiled. Approximately 1650 citations are included comprising formal reports, quick-release technical memorandums, contractor reports, journal articles and other publications, meeting presentations, technical talks, computer programs, tech briefs, and patents.

  14. NASA Langley Scientific and Technical Information Output: 1996

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Phillips, Marilou S. (Compiler)

    1997-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1996. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  15. The role of NASA for aerospace information

    NASA Technical Reports Server (NTRS)

    Chandler, G. P., Jr.

    1980-01-01

    The NASA Scientific and Technical Information Program operations are performed by two contractor operated facilities. The NASA STI Facility, located near Baltimore, Maryland, employs about 210 people who process report literature, operate the computer complex, and provide support for software maintenance and developments. A second contractor, the Technical Information Services of the American Institute of Aeronautics and Astronautics, employs approximately 80 people in New York City and processes the open literature such as journals, magazines, and books. Features of these programs include online access via RECON, announcement services, and international document exchange.

  16. Scientific and technical information output of the Langley Research Center for calendar year 1982

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Citations are presented for 1380 for formal reports; quick-release technical memorandum; contractor reports; journal articles and periodical literature; technical talks and meeting presentations; computer programs; tech briefs, and patents produced during 1982. An author index is provided.

  17. 48 CFR 1852.225-70 - Export Licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... writing, that the Contracting Officer authorizes it to export ITAR-controlled technical data (including... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Contractor shall be responsible for obtaining export licenses, if...

  18. DOE standard: The Department of Energy Laboratory Accreditation Program for radiobioassay

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-01

    This technical standard describes the US Department of Energy Laboratory Accreditation Program (DOELAP) for Radiobioassay, for use by the US Department of Energy (DOE) and DOE Contractor radiobioassay programs. This standard is intended to be used in conjunction with the general administrative technical standard that describes the overall DOELAP accreditation process--DOE-STD-1111-98, Department of Energy Laboratory Accreditation Program Administration. This technical standard pertains to radiobioassay service laboratories that provide either direct or indirect (in vivo or in vitro) radiobioassay measurements in support of internal dosimetry programs at DOE facilities or for DOE and DOE contractors. Similar technical standards have been developedmore » for other DOELAP dosimetry programs. This program consists of providing an accreditation to DOE radiobioassay programs based on successful completion of a performance-testing process and an on-site evaluation by technical experts. This standard describes the technical requirements and processes specific to the DOELAP Radiobioassay Accreditation Program as required by 10 CFR 835 and as specified generically in DOE-STD-1111-98.« less

  19. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  20. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  1. 78 FR 33994 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 252 RIN Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to Technical Data (DFARS 2009-D031); Correction AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD...

  2. 76 FR 31393 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-52; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... 2010-017 Robinson. Ethics Programs. VI Technical Amendments... SUPPLEMENTARY INFORMATION: Summaries for... technology that is a commercial item. Item V--Oversight of Contractor Ethics Programs (FAR Case 2010-017... Code of Business Ethics and Conduct. Contracting officers may ask to see a contractor's code of ethics...

  3. FY 2002 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2003-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2002. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  4. NASA Langley Scientific and Technical Information Output, 1995. Volume 1

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Phillips, Marilou S. (Compiler)

    1996-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1995. Included are citations for formal reports, high-numbered conference publications, high-numbered technical memorandums, contractor reports, journal articles and other publications, meeting presentations, technical talks, computer programs, tech briefs, and patents.

  5. 2005 NASA Seal/Secondary Air System Workshop, Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)

    2006-01-01

    The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

  6. Orbital atomic oxygen effects on materials: An overview of MSFC experiments on the STS-46 EOIM-3

    NASA Astrophysics Data System (ADS)

    Linton, Roger C.; Vaughn, Jason A.; Finckenor, Miria M.; Kamenetzky, Rachel R.; Dehaye, Robert F.; Whitaker, Ann F.

    1995-02-01

    The third Evaluation of Oxygen Interaction with Materials experiment was flown on Space Shuttle Mission STS-46 (July 31 - August 8, 1992), representing a joint effort of several NASA centers, universities, and contractors. This array of active instrumentation and material exposure sub-assemblies was integrated as a Shuttle cargo bay pallet experiment for investigating the effects of orbital atomic oxygen on candidate space materials. Marshall Space Flight Center contributed several passive exposure trays of material specimens, uniform stress and static stress material exposure fixtures, the Atomic Oxygen Resistance Monitor (AORM), and specimens of thermal coatings for the EOIM-3 variable exposure mechanisms. As a result of 42 hours of spacecraft velocity vector-oriented exposure during the later phases of the STS-46 mission in LEO, EOIM-3 materials were exposed to an atomic oxygen fluence of 2.2 x 10(exp 20) atoms/sq cm. In this paper, an overview is presented of the technical approaches and results from analyses of the MSFC flight specimens, fixtures, and the AORM. More detailed results from earlier EOIM missions, the LDEF, and from laboratory testing are included in associated papers of this conference session.

  7. Orbital atomic oxygen effects on materials: An overview of MSFC experiments on the STS-46 EOIM-3

    NASA Technical Reports Server (NTRS)

    Linton, Roger C.; Vaughn, Jason A.; Finckenor, Miria M.; Kamenetzky, Rachel R.; Dehaye, Robert F.; Whitaker, Ann F.

    1995-01-01

    The third Evaluation of Oxygen Interaction with Materials experiment was flown on Space Shuttle Mission STS-46 (July 31 - August 8, 1992), representing a joint effort of several NASA centers, universities, and contractors. This array of active instrumentation and material exposure sub-assemblies was integrated as a Shuttle cargo bay pallet experiment for investigating the effects of orbital atomic oxygen on candidate space materials. Marshall Space Flight Center contributed several passive exposure trays of material specimens, uniform stress and static stress material exposure fixtures, the Atomic Oxygen Resistance Monitor (AORM), and specimens of thermal coatings for the EOIM-3 variable exposure mechanisms. As a result of 42 hours of spacecraft velocity vector-oriented exposure during the later phases of the STS-46 mission in LEO, EOIM-3 materials were exposed to an atomic oxygen fluence of 2.2 x 10(exp 20) atoms/sq cm. In this paper, an overview is presented of the technical approaches and results from analyses of the MSFC flight specimens, fixtures, and the AORM. More detailed results from earlier EOIM missions, the LDEF, and from laboratory testing are included in associated papers of this conference session.

  8. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical... Organizations 2131.205-43 Trade, business, technical and professional activity costs. (a) FEGLI Program contractors shall seek the advance written approval of the contracting officer for allowability of all or part...

  9. 59th Medical Wing Clinical Research Division Clinical Investigations Program Posters (Count: 2)

    DTIC Science & Technology

    2017-05-08

    Calcote, Joshua - Contractor , 59 MDW/ SGVU DYES (gJ NO N I A 5. PROTOCOL TITLE: (NOTE: For each new release of medical research or technical information...Corresponding Author Joshua C. Calcote Contractor 59 MDW/ SGVU b. c. d. e. 17. IS A 502 ISG/JAC ETHICS REVIEW REQUIRED (JER DOD 5500.07-R)? DYES 181...PRESENTATION. 18. AUTHOR’S PRINTED NAME, RANK. GRADE 19. AUTHOR’S SIGNATURE Dr. Joshua C. Calcote, Contractor ~~~:.7.:.:.-:::.---=::~- -- -·--- ~- 21

  10. NASA/contractor partnership on the second TDRSS ground terminal program: Breaking barriers

    NASA Technical Reports Server (NTRS)

    Tierney, Paul G.

    1992-01-01

    The Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT) Program from its technical and programmatic backgrounds is introduced and then several techniques to enhance communication and empower the NASA Contractor team are described. A major factor in our success was an approach used to shorten the time span of the Critical Design Review phase. This approach is described. The relationships involving NASA's O&M contractor are discussed. A set of lessons learned is included.

  11. Contracting AFSC 651X0, AFPT 90-651-862

    DTIC Science & Technology

    1991-10-01

    CONTRACTING 78 TABLE 30 TECHNICAL TASKS NOT REFERENCED TO STS HIGH IN TRAINING EMPHASIS (TE) RATINGS TE TASKS RATING N1000 PREPARE DD FORMS 1784 5.08 M739 ...requirements with contractors or customers 89 M739 Compare contractor invoices with QAE reports 89 M731 Analyze adequacy of corrective actions to quality

  12. Measure Guideline. Wall Air Sealing and Insulation Methods in Existing Homes; An Overview of Opportunity and Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, S.; Stephenson, R.

    2012-09-01

    This guide provides renovators and retrofit contractors an overview of considerations when including wall air sealing and insulation in an energy retrofit project. It also outlines the potential project risks, various materials for insulating, possible field inspections needed, installation procedures, as well as the benefits and drawbacks.

  13. Bibliography of Lewis Research Center technical contributions announced in 1976

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Abstracts of Lewis authored publications and publications resulting from Lewis managed contracts which were announced in the 1976 issues of STAR (Scientific and Technical Aerospace Reports) and IAA (International Aerospace Abstracts) are presented. Research reports, journal articles, conference presentations, patents and patent applications, and these are included. The arrangement is by NASA subject category. Citations indicate report literature (identified by their N-numbers) and the journal and conference presentations (identified by their A-numbers). A grouping of indexes helps locate specific publications by author (including contractor authors), contractor organization, contract number, and report number.

  14. FY 2005 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Narmore, K. A. (Compiler)

    2007-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2005. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  15. FY 1989 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1989-01-01

    A compendium of bibliographic references to papers presented by Marshall Space Flight Center (MSFC) personnel and contractors during FY 1989 is provided. The papers include formal NASA technical reports, memoranda, papers which were published in technical journals, and presentations by MSFC personnel. The formal NASA technical reports and memoranda have abstracts included. Sources for obtaining these documents are also included.

  16. FY 1985 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1985-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by Marshal Space Flight Center (MSFC) personnel in FY 85. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service (NTIS), 5285 Port Royal Road, Springfield, Va. 22161.

  17. FY 1991 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1991-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 1991 are presented. Papers of MSFC contractors are also included. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  18. NASA Langley scientific and technical information output: 1994, volume 1

    NASA Technical Reports Server (NTRS)

    Phillips, Marilou S. (Compiler); Stewart, Susan H. (Compiler)

    1995-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1994. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Computer Programs, Tech Briefs, and Patents.

  19. NASA Langley Scientific and Technical Information Output: 1994. Volume 1

    NASA Technical Reports Server (NTRS)

    Phillips, Marilou S. (Compiler); Stewart, Susan H. (Compiler)

    1995-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1994. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Computer Programs, Tech Briefs, and Patents.

  20. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Providing technical data...

  1. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Providing technical data...

  2. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Providing technical data...

  3. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Providing technical data...

  4. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Providing technical data...

  5. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Award, renewal, and extension. (a) Effective work performance under management and operating contracts... prospective contractor's technical and managerial capacity are sufficient, that organizational conflicts of... rights to involve itself, if necessary, in technical and managerial decisionmaking concerning performance...

  6. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  7. Technical paper contest for women 1992. Space challenges: Earth and beyond

    NASA Technical Reports Server (NTRS)

    Orans, Robin (Editor)

    1993-01-01

    Two of the major concerns of the NASA Ames Research Center (NASA ARC) Advisory Committee for Women (ACW) are that recruitment of women scientists, engineers, and technicians needs to increase and that barriers to advancement need to be removed for improved representation of women in middle and upper management and scientific positions. One strategy that addressed this concern was the ACW sponsorship of a Technical Paper Contest for Women at Ames Research Center. Other sponsors of the Contest were the Ames Equal Opportunity Council and the Ames Contractor Council. The Technical Paper Contest for Women greatly increased the visibility of both the civil service women and the women who work for contractors at Ames. The women had the opportunity to hone their written and oral presentation skills. Networking among Ames women increased.

  8. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...

  9. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  10. Scientific and technical information output of the Langley Research Center for Calender year 1981

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Included are citations for formal reports, quick-release technical memorandums, contractor reports, journal articles and periodical literature, meeting/conference papers, and computer programs. Tech briefs, patents, and oral presentations to conferences/workshops are also included.

  11. 77 FR 40026 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... and contractor logistics, Quality Assurance Team support services, engineering and technical support..., engineering and technical support, and other related elements of program support. The estimated cost is $49..., maintenance, or training is Confidential. Reverse engineering could reveal Confidential information...

  12. FY 1995 Scientific and Technical Reports, Articles, Papers, and Presentations, Volume 1

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1995-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY95. It also includes papers of MSFC contractors. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  13. Scientific and technical information output of the Langley Research Center for calendar year 1980

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1980. Approximately 1400 citations are given. Formal reports, quick-release technical memorandums, contractor reports, journal articles, meeting/conference papers, computer programs, tech briefs, patents, and unpublished research are included.

  14. Scientific and technical information output of the Langley Research Center for calendar year 1986

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1986. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Techncial Talks, Computer Programs, Tech Briefs, and Patents.

  15. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.

  16. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling greets David Brock.

  17. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May shares opening remarks.

  18. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. Decatur Mayor Tab Bowling welcomes attendees.

  19. Fiscal year 1977 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1977-01-01

    This bibliography lists 78 NASA technical memoranda, notes, papers, and reports presented by Marshall Space Flight Center personnel in FY 1977. In addition, 525 papers by contractors to that facility are cited along with 129 papers cleared for presentation.

  20. 78 FR 78939 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Quantity or Quantities of Articles or Services under Consideration for Purchase: C-130J technical, engineering and software support; software updates and patches; familiarization training for Portable Flight... and contractor technical support services; and other related elements of logistics and program support...

  1. Energy, Power and Thermal Research Overview

    DTIC Science & Technology

    2010-09-01

    Research Overview Rick Fingers, Ph.D. Chief Energy/Power/Thermal Division Propulsion Directorate Air Force Research ... Air Vehicles Sensors AFOSR 5 AFRL People & Facilities • 10 Major R&D Sites across US • 40 Sites World-Wide • $40B Real Property & Capital throughout... AFRL • 5,764 Government Employees – 4570 Air Force Civilian – 1194 Military • 3,844 Onsite Contractors 6 Propulsion Directorate’s Strategic

  2. 2006 NASA Seal/Secondary Air System Workshop; Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce, M. (Editor); Hendricks, Robert C. (Editor); Delgado, Irebert (Editor)

    2007-01-01

    The 2006 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of NASA s new fundamental aeronautics technology project; (iii) Overview of NASA Glenn Research Center s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakages as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed seal technologies employed by the Apollo command module that serve as an excellent basis for seals for NASA s new Crew Exploration Vehicle (CEV).

  3. FY 1994 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1994-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center personnel in FY94. It also includes papers of MSFC contractors and author indexes. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  4. Photovoltaic energy systems: Program summary fiscal year 1983

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An overview of government funded activities in photovoltaic energy conversion research is given. Introductory information, a list of directing organizations, a list of acronyms and abbreviations, and an index of current contractors are given.

  5. Measure Guideline: Wall Air Sealing and Insulation Methods in Existing Homes; An Overview of Opportunity and Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, S.; Stephenson, R.

    2012-09-01

    This guide provides renovators and retrofit contractors an overview of considerations when including wall air sealing and insulation in an energy retrofit project. It also outlines the potential project risks, various materials for insulating, possible field inspections needed, installation procedures, as well as the benefits and drawbacks. The purpose of this document is to provide the outline of the overview and process of insulating and air sealing walls so that home retrofit professionals can identify approaches to air sealing and insulation measures.

  6. FY 2001 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    2002-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2001. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  7. FY 2004 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2006-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel FY 2004. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this TM maybe of value to the scientific and engineering community in determining what information has been published and what is available.

  8. FY 2003 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2004-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2003. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Spring.eld, VA 22161. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  9. 48 CFR 245.7002 - Duties and responsibilities of plant clearance officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clearance cases and disposal documents; (e) Initiate screening and provide technical support to screeners in...) Technical and quantitative allocability of property; (g) Ensure the timely shipment or release by the... are minimized and, when necessary, work with the contractor and property administrator to implement...

  10. The 1994 Ames Research Center publications: A bibliography

    NASA Technical Reports Server (NTRS)

    Scarich, Shelley J. (Editor)

    1995-01-01

    This document is a compilation of the scientific and technical information that Ames Research Center has produced during the calendar year 1994. Included are citations for formal reports, high-number conference publications, high-number technical memorandums, contractor reports, journal articles, meeting presentation, tech briefs, patents, and translations.

  11. David Brock addresses the "How to Launch Your Business with NASA" forum.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. David Brock, head of Marshall's Small Business Office talks about doing business with Marshall.

  12. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May and Decatur Mayor Tab Bowling enjoy a light moment.

  13. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. OSAC Director Johnny Stephenson talks about Marshall's Mission areas to audience

  14. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling chats with NASA retiree Don Odum

  15. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. City of Hartselle Mayor Randy Garrison welcomes attendees to conference.

  16. 48 CFR 252.204-7014 - Limitations on the Use or Disclosure of Information by Litigation Support Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Computer software does not include computer data bases or computer software documentation. Litigation... includes technical data and computer software, but does not include information that is lawfully, publicly available without restriction. Technical data means recorded information, regardless of the form or method...

  17. 40 CFR 35.4235 - Are there specific provisions my group's contract(s) must contain?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4235 Are there specific... progress reports; (3) Expenditures; and (4) Commitments indicating their relationship to established costs...

  18. 76 FR 11414 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions (DFARS Case... (DFARS) to require contractors to report independent research and development (IR&D) projects generating... the address shown below on or before May 2, 2011, to be considered in the formation of the final rule...

  19. FY 1978 scientific and technical reports, articles, papers, and presentations. [bibliography

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1978-01-01

    Abstracts of 73 technical papers published or presented by MSFC personnel in FY-78 are presented. In addition, over 400 papers by contractors to that facility are listed along with the STAR document number for each report. Titles of 208 additional papers already cleared for publication are included.

  20. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  1. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  2. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  3. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  4. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  5. 48 CFR 1852.225-70 - Export Licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the... will have access to export-controlled technical data or software. (c) The Contractor shall be... software) pursuant to the exemption at 22 CFR 125.4(b)(3). The Contracting Officer or designated...

  6. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) under a contract, the primary purpose of which is to furnish independent and impartial advice or... Government-Furnished Information Marked with Restrictive Legends. (3) Form, fit, and function data means..., fit, and function data; (iii) Are a correction or change to technical data furnished to the Contractor...

  7. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  8. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  9. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  10. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  11. FY 1990 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1990-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 90 are presented. Also included are papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from NTIS. The information may be of value to the scientific and engineering community in determining what information has been published and what is available.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  13. Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    2001-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2000. It also includes papers of MSFC contractors. After being announced in STAR, all the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  14. FY 1998 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    1999-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC (Marshall Space Flight Center) personnel in FY98. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  15. DFAS Needs More Effective Controls Over Managing DoD Contractor Debt

    DTIC Science & Technology

    2011-07-15

    Acrobat fil e onl y) to audc lev@dod ig.m il. Copies of management comments must have the actual signature of the authori zing official for yo ur...Attribute Testing Results 18 E. Sampling Methodology 20 Glossary of Technical Terms 21 Management...Bill of Collection number to each contractor debt as a debt management tool. CDS allows users to prepare a demand letter from the database, post

  16. Trust in Teams Scale, Trust in Leaders Scale: Manual for Administration and Analyses

    DTIC Science & Technology

    2008-07-01

    Committee The scientific or technical validity of this Contractor Report is entirely the responsibility of the contractor and the...and Farley’s exploratory analysis of the unit climate profile. DRDC Toronto Report CR-2001-149. KORSGAARD, M . A., S. E. BRODT, & WHITENER, E. M ...8217 trust in leader, satisfaction, and organizational citizenship behaviors. Leadership Quarterly, 1(2), 107-142. ROUSSEAU , D ., SITKIN, S., BURT, R

  17. Optical Data Processing.

    DTIC Science & Technology

    1985-10-01

    importance of this topic and the growing number of OPR papers in these references signifies the importance of this topic..’-’ In this present review...Research (grant 79-0091), and inde- random numbers is used at each TB. To simulate de- pendent contractors of Unicorn Systems Incorporated tector noise...ACKNOWLEDGMENTS. The support of Unicorn Systems Inc. contractors and various CMU grants from AFOSR and NASA Lewis are gratefully acknowledged as is the technical

  18. The advantages of cost plus award fee contracts

    NASA Technical Reports Server (NTRS)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  19. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 1. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-06-01

    The conceptual design of an advanced central receiver power system using liquid sodium as a heat transport medium has been completed by a team consisting of the Energy Systems Group (prime contractor), McDonnell Douglas, Stearns-Roger, The University of Houston, and Salt River Project. The purpose of this study was to determine the technical and economic advantages of this concept for commercial-scale power plants. This final report covers all tasks of the project. These tasks were as follows: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) select commercial configuration; (4) commercial plant conceptual design; (5) assessment of commercialmore » plant; (6) advanced central receiver power system development plan; (7) program plan; (8) reports and data; (9) program management; and (10) safety analysis. A programmatic overview of the accomplishments of this program is given. The 100-MW conceptual commercial plant, the 281-MW optimum plant, and the 10-MW pilot plant are described. (WHK)« less

  20. 7 CFR 550.46 - Competition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance, financial and technical resources or accessibility to other necessary resources. In certain... eliminate competition or otherwise restrain trade. In order to ensure objective contractor performance and...

  1. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  2. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  3. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  4. 48 CFR 9.502 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subpart applies to contracts with either profit or nonprofit organizations, including nonprofit... engineering and technical direction work performed by a contractor that does not have overall contractual...

  5. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  6. 48 CFR 252.227-7025 - Limitations on the use or disclosure of government-furnished information marked with restrictive...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Software and Noncommercial Computer Software Documentation clause of this contract. (3) For Small Business... Rights in Noncommercial Technical Data and Computer Software—Small Business Innovative Research (SBIR) Program clause of this contract. (b) Technical data or computer software provided to the Contractor as...

  7. 48 CFR 452.215-71 - Instructions for the Preparation of Technical and Business Proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contained in the technical proposal so that the contractor's understanding of the statement of work may be... required if appropriate.) (2) Business Proposal. (a) Furnish financial statements for the last two years... specified in the statement of work. Any “alternate” proposal may be considered if overall performance would...

  8. The FY 1992 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1992-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY92. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  9. FY 1988 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1988-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 88. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the NationaL Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  10. FY87 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1987-01-01

    The document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY87. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, Va. 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  11. FY 1996 Scientific and Technical Reports, Articles, Papers, and Presentations. Volume 1

    NASA Technical Reports Server (NTRS)

    Turner-Waits, Joyce E. (Compiler)

    1996-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY96. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  12. Fiscal year 1993 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1993-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY93. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  13. Gender Issues in Technical Communication Studies: An Overview of the Implications for the Profession, Research, and Pedagogy.

    ERIC Educational Resources Information Center

    Allen, Jo

    1991-01-01

    Presents an overview of research and unanswered questions related to gender issues in technical communication. Addresses the consequences of the feminization of technical communication, research on gender differences in technical communication, and the means for encouraging a more gender-balanced view of business and industry. (SR)

  14. Needs of Non-Energy Focused Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liakus, C.

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  15. Needs of Non Energy-Focused Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  16. Federal Energy Information Systems.

    ERIC Educational Resources Information Center

    Coyne, Joseph G.; Moneyhun, Dora H.

    1979-01-01

    Describes the Energy Information Administration (EIA) and the Technical Information Center (TIC), and lists databases accessible online to the Department of Energy and its contractors through DOE/RECON. (RAA)

  17. 48 CFR 252.235-7003 - Frequency authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... characteristics of the proposed electromagnetic radiating device to the Contracting Officer during the initial... Contractor shall provide the technical operating characteristics of the proposed electromagnetic radiating...

  18. BTSC VAPOR INSTRUSION PRIMER "VAPOR INTRUSION CONSIDERATION FOR REDEVELOPMENT"

    EPA Science Inventory

    This primer is designed for brownfields stakeholders concerned about vapor intrusion, including property owners, real estate developers, and contractors performing environmental site investigations. It provides an overview of the vapor intrusion issue and how it can impact the ap...

  19. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.23 How will Reclamation... expertise needed may include, but are not limited to, water management planning, engineering, hydrology...

  20. Control of Subsurface Contaminant Migration by Vertical Engineered Barriers

    EPA Science Inventory

    This Fact Sheet is intended to provide remedial project managers (RPMs), on-scene coordinators (OSCs), contractors, and other remediation stakeholders with a basic overview of hazardous waste containment systems constructed to prevent or limit the migration of contamination in gr...

  1. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government..., or because of special skills or knowledge necessary for monitoring the contractor's work. The...

  2. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government..., or because of special skills or knowledge necessary for monitoring the contractor's work. The...

  3. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government..., or because of special skills or knowledge necessary for monitoring the contractor's work. The...

  4. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.605... prospective contractor's technical and managerial capacity are sufficient, that organizational conflicts of...

  5. 7 CFR 1944.407 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.407 Limitations. The amount of... typical needed repairs, and the cost savings between self-help and contractor rehabilitation and repair...

  6. 20 CFR 435.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... must be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms of functions to be performed or performance...

  7. Overview

    Science.gov Websites

    maintaining both types of cards. Common Access Card (CAC) "Smart" ID card for active-duty military personnel, Selected Reserve, DoD civilian employees, and eligible contractor personnel. CAC Types & and military retirees to access service benefits and privileges. ID Card Types & Eligibility

  8. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  9. 40 CFR 35.4210 - Must my group solicit and document bids for our procurements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4210 Must my group solicit and... the work; (ii) Provide potential sources in the scope of work to be performed and the criteria your...

  10. 49 CFR 19.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Consideration shall be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms of functions to be performed or performance...

  11. 22 CFR 518.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... Consideration shall be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms or functions to be performed or performance...

  12. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  13. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  14. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  15. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  16. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  17. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  18. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  19. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  20. Cross-national research on contractor evaluation procedures in public works procurement

    NASA Astrophysics Data System (ADS)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  1. Recent Improvements to the Copernicus Trajectory Design and Optimization System

    NASA Technical Reports Server (NTRS)

    Williams, Jacob; Senent, Juan S.; Ocampo, Cesar; Lee, David E.

    2012-01-01

    Copernicus is a software tool for spacecraft trajectory design and optimization. The latest version (v3.0.1) was released in October 2011. It is available at no cost to NASA centers, government contractors, and organizations with a contractual affiliation with NASA. This paper is a brief overview of the recent development history of Copernicus. An overview of the evolution of the software and a discussion of significant new features and improvements is given, and how the tool is used to design spacecraft missions

  2. 78 FR 21850 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Parts 215, 235, and 237 Government procurement. Manuel Quinones, Editor, Defense Acquisition Regulations...-79 for notifying affected incumbent contractors of Government in-sourcing actions, in accordance with...

  3. Decommissioning of the Northrop TRIGA reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozens, George B.; Woo, Harry; Benveniste, Jack

    1986-07-01

    An overview of the administrative and operational aspects of decommissioning and dismantling the Northrop Mark F TRIGA Reactor, including: planning and preparation, personnel requirements, government interfacing, costs, contractor negotiations, fuel shipments, demolition, disposal of low level waste, final survey and disposition of the concrete biological shielding. (author)

  4. Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Turner, J. E. (Compiler)

    2000-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  5. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  6. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  7. 75 FR 19677 - Medicare Program; Policy and Technical Changes to the Medicare Advantage and the Medicare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...

  8. EPA Region 9 Targeted Brownfields Assessment (TBA) Application

    EPA Pesticide Factsheets

    EPA provides contractor assistance for property assessment to determine eligibility for up to $100,000 worth of technical assistance. Use this assessment form for properties in Arizona, California, Nevada, and Hawaii.

  9. Locations Accessible | FNLCR Staging

    Cancer.gov

    The Frederick National Laboratory for Cancer Research campus is located 50 miles northwest of Washington, D.C., and 50 miles west of Baltimore, Maryland, in Frederick, Maryland.Operations and Technical Support contractor Leidos Biomedical Resea

  10. FY 1999 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J.oyce E.Turner

    2000-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  11. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duncan, Garth M.; Saunders, Scott A.

    2013-07-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two differentmore » prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)« less

  12. 29 CFR 1952.107 - Changes to approved plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (b) The State submitted an industrial hygiene technical manual patterned after the Federal manual... under the plan to Superfund sites and private contractors working on U.S. Army Corps of Engineers dam...

  13. Technical Solutions to Common Indoor Air Quality Issues in Schools

    EPA Pesticide Factsheets

    Indoor Air Quality (IAQ) Design Tools for Schools provides voluntary guidance for school personnel, architects, engineers, builders and contractors, parents, and the community on key school construction and renovation issues.

  14. Managing Challenges in a Multi Contractor Project

    NASA Technical Reports Server (NTRS)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  15. Space Fence PDR Concept Development Phase

    NASA Astrophysics Data System (ADS)

    Haines, L.; Phu, P.

    2011-09-01

    The Space Fence, a major Air Force acquisition program, will become the dominant low-earth orbit uncued sensor in the space surveillance network (SSN). Its primary objective is to provide a 24/7 un-cued capability to find, fix, and track small objects in low earth orbit to include emerging and evolving threats, as well as the rapidly growing population of orbital debris. Composed of up to two geographically dispersed large-scale S-band phased array radars, this new system-of-systems concept will provide comprehensive Space Situational Awareness through net-centric operations and integrated decision support. Additionally, this program will facilitate cost saving force structure changes in the SSN, specifically including the decommissioning of very-high frequency VHF Air Force Space Surveillance System (AFSSS). The Space Fence Program Office entered a Preliminary Design Review (PDR) concept development phase in January 2011 to achieve the delivery of the Initial Operational Capability (IOC) expected in FY17. Two contractors were awarded to perform preliminary system design, conduct radar performance analyses and evaluations, and develop a functional PDR radar system prototype. The key objectives for the Phase A PDR effort are to reduce Space Fence total program technical, cost, schedule, and performance risk. The overall program objective is to achieve a preliminary design that demonstrates sufficient technical and manufacturing maturity and that represents a low risk, affordable approach to meet the Space Fence Technical Requirements Document (TRD) requirements for the final development and production phase to begin in 3QFY12. This paper provides an overview of the revised Space Fence program acquisition strategy for the Phase-A PDR phase to IOC, the overall program milestones and major technical efforts. In addition, the key system trade studies and modeling/simulation efforts undertaken during the System Design Requirement (SDR) phase to address and mitigate technical challenges of the Space Fence System will also be discussed. Examples include radar system optimization studies, modeling and simulation for system performance assessment, investigation of innovative Astrodynamics algorithms for initial orbit determination and observation correlation.

  16. Contractor point of view for system development and test program

    NASA Technical Reports Server (NTRS)

    Koide, F. K.; Ringer, D. E.; Earl, C. E.

    1981-01-01

    Industry's practice of testing space qualified hardware is examined. An overview of the Global Positioning System (GPS) Test Program is discussed from the component level to the sub-system compatibility tests with the space vehicle and finally to the launch site tests, all related to the Rubidium clock.

  17. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  18. Locations Accessible | Frederick National Laboratory for Cancer Research

    Cancer.gov

    The Frederick National Laboratory for Cancer Research campus is located 50 miles northwest of Washington, D.C., and 50 miles west of Baltimore, Maryland, in Frederick, Maryland.Operations and Technical Support contractor Leidos Biomedical Resea

  19. Technology advancements for the U.S. manned Space Station - An overview

    NASA Technical Reports Server (NTRS)

    Simon, William E.

    1987-01-01

    The structure and methodology of the Johnson Space Center (JSC) advanced development program is described. An overview of the program is given, and the technology transfer process to other disciplines is described. The test bed and flight experiment programs are described, as is the technology assessment which was performed at the end of the Phase B program. The technology program within each discipline is summarized, and the coordination and integration of the JSC program with the activities of other NASA centers and with work package contractors are discussed.

  20. Truck side guard technical overview : safety and operational considerations

    DOT National Transportation Integrated Search

    2015-04-23

    This technical overview provides safety and operational considerations for truck side guards. Truck side guards are designed to keep pedestrians, bicyclists, and motorcyclists - known as vulnerable road users (VRUs) from being run over by a large tru...

  1. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reidel, Steve; Chamness, Mickie A.

    This appendix provides a detailed description of geology under the Central Plateau of the Hanford Site, emphasizing the areas around tank farms. It is to be published by client CH2M HILL Hanford Group, Inc., as part of a larger, multi-contractor technical report.

  3. War-gaming application for future space systems acquisition part 1: program and technical baseline war-gaming modeling and simulation approaches

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes static Bayesian game models with "Pure" and "Mixed" games for the development of an optimum Program and Technical Baseline (PTB) solution for affordable acquisition of future space systems. The paper discusses System Engineering (SE) frameworks and analytical and simulation modeling approaches for developing the optimum PTB solutions from both the government and contractor perspectives.

  4. The 1990 Johnson Space Center bibliography of scientific and technical papers

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Abstracts are presented of scientific and technical papers written and/or presented by L. B. Johnson Space Center (JSC) authors, including civil servants, contractors, and grantees, during the calendar year of 1990. Citations include conference and symposium presentations, papers published in proceedings or other collective works, seminars, and workshop results, NASA formal report series (including contractually required final reports), and articles published in professional journals.

  5. Producibility and Production Aspects of the Market Analysis Process

    DTIC Science & Technology

    1989-06-01

    for most TROSCOM general purpose systems and equipment are the U.S. Army Quartermaster Center and School, Fort Lee, VA ( fuels handling and storage...established a Mission Area Proponency Branch staffed with military R&D Coordinator Officers (formerly TRISOs - Technical Requirements Integration Staff...time is spent reacting, rather than acting, i.e., the amount of work required to supply numerous reports on delinquent contractors and on Technical

  6. The 1979 Ames Research Center Publications: A continuing bibliography

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This bibliography lists formal NASA publications, journal articles, books, chapters of books, patents, and contractor reports issued by Ames Research Center which were indexed by Scientific and Technical Aerospace Reports, Limited Scientific and Technical Aerospace Reports, and International Aerospace Abstracts in 1979. Citations are arranged by directorate, type of publication, and NASA accession numbers. Subject, Personal Author, Corporate Source, Contract Number, and Report/Accession Number Indexes are provided.

  7. Ames Research Center publications: A continuing bibliography, 1978

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This bibliography lists formal NASA publications, journal articles, books, chapters of books, patents and contractor reports issued by Ames Research Center which were indexed by Scientific and Technical Aerospace Abstracts, Limited Scientific and Technical Aerospace Abstracts, and International Aerospace Abstracts in 1978. Citations are arranged by directorate, type of publication and NASA accession numbers. Subject, personal author, corporate source, contract number, and report/accession number indexes are provided.

  8. 76 FR 780 - Office of Special Education and Rehabilitative Services Overview Information; National Institute...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... Numbering System (DUNS) number and a Taxpayer Identification Number (TIN); b. Register both your DUNS number and TIN with the Central Contractor Registry (CCR), the Government's primary registrant database; c. Provide your DUNS number and TIN on your application; and d. Maintain an active CCR registration with...

  9. Contracting for Facilities Services. Critical Issues in Facilities Management. No. 9.

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    This book has been designed to provide practical information to managers on how to work with outside contractors in the higher education facilities area, and provides "real world" advice on the opportunities and pitfalls of privatization. Overviews and detailed case studies of contracting-out for services such as custodial services and…

  10. 75 FR 49484 - Office of Postsecondary Education; Overview Information; Jacob K. Javits Fellowship Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Associated States. Applicants must also either: Be entering into a doctoral program in academic year 2011... study for which they are seeking support; or be entering a Master of Fine Arts program in academic year... with the Central Contractor Registry (CCR), the Government's primary registrant database; and (3) you...

  11. Concentrating Solar Power Projects - Delingha 50MW Thermal Oil Parabolic

    Science.gov Websites

    Trough project | Concentrating Solar Power | NREL Delingha 50MW Thermal Oil Parabolic Trough project Status Date: April 17, 2017 Project Overview Project Name: Delingha 50MW Thermal Oil Parabolic Contractor: IDOM : Thermal energy storage system engineering Plant Configuration Solar Field # of Loops: 190

  12. Bibliography of NASA published reports on general aviation, 1975 to 1981

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This bibliography lists 478 documents which relate to all heavier-than-air fixed wing aircraft exclusive of military types and those used for commercial air transport. An exception is the inclusion of commuter transport aircraft types within the general aviation category. NASA publications included in this bibliography are: conference publications (CP), reference publications (RP), technical memorandums (TM, TMX), technical notes (TN), technical papers (TP), and contractor reports (CR). In addition, papers and articles on NASA general aviation programs published by technical societies (AIAA, SAE, etc.) are included, as well as those listed in NASA's Scientific and Technical Aerospace Reports (STAR) Journal. Author and subject indexes are also provided to facilitate use of the bibliography.

  13. ORD BBS USER'S MANUAL - VERSION 2.0

    EPA Science Inventory

    The Office of Research and Development's Electronic Bulletin Board System (BBS or ''Board") is designed to facilitate the exchange of technical information and ORD products among EPA Headquarters, laboratory and Regional staff and contractors; States; other Federal agencies, univ...

  14. 77 FR 76936 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ...; List of Subjects in 48 CFR Parts 201, 203, 204, 215, 219, 245, and 252 Government procurement. Manuel... clause 52.203-13, Contractor Code of Business Ethics and Conduct, is the DoD Office of Inspector General...

  15. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... rejection to the contracting officer. (c) The designee authorized to grant exemptions from value engineering...

  16. Nuclear waste disposal in space

    NASA Technical Reports Server (NTRS)

    Burns, R. E.; Causey, W. E.; Galloway, W. E.; Nelson, R. W.

    1978-01-01

    Work on nuclear waste disposal in space conducted by the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, and contractors are reported. From the aggregate studies, it is concluded that space disposal of nuclear waste is technically feasible.

  17. Ames Research Center publications: A continuing bibliography, 1980

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This bibliography lists formal NASA publications, journal articles, books, chapters of books, patents, contractor reports, and computer programs that were issued by Ames Research Center and indexed by Scientific and Technical Aerospace Reports, Limited Scientific and Technical Aerospace Reports, International Aerospace Abstracts, and Computer Program Abstracts in 1980. Citations are arranged by directorate, type of publication, and NASA accession numbers. Subject, personal author, corporate source, contract number, and report/accession number indexes are provided.

  18. 7 CFR 1944.407 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.407 Limitations. The amount of... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... typical needed repairs, and the cost savings between self-help and contractor rehabilitation and repair...

  19. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ordinarily should not be required, but if available should be considered); (2) Engineering work, production scheduling, planning, technical study and supervision, and other necessary services; (3) Efficiency of the contractor, with particular regard to— (i) Attainment of quantity and quality production; (ii) Reduction of...

  20. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  1. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  2. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  3. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  4. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamel, D.R.

    This paper identifies the kinds of risk assessments being done by or for the US Department of Agriculture (USDA) Forest Service. Summaries of data sources currently in use and the pesticide risk assessments completed by the agency or its contractors are discussed. An overview is provided of the agency`s standard operating procedures for the conduct of toxicological, ecological, environmental fate, and human health risk assessments.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boing, L.E.

    This paper presents an overview of the US experiences in the decommissioning technical area. Sections included are: (1) an overview of the magnitude of the problem, (2) a review of the US decommissioning process, (3) regulation of decommissioning, (4) regulatory and funding requirements for decommissioning, and (5) a general overview of all on-going and completed decommissioning projects to date in the US. The final section presents a review of some issues in the decommissioning area currently being debated in the technical specialists community.

  7. Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental, LLC

    2009-09-01

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  8. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the best scientific and technological sources, it is important that the contractor not subcontract technical or scientific work without the contracting officer's advance knowledge. During the negotiation of a cost-reimbursement R&D contract, the contracting officer shall obtain complete information...

  9. 48 CFR 1845.7210-1 - Utilization surveys.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Utilization surveys. 1845... surveys. (a) The property administrator is responsible for ensuring that the contractor has effective... administration office shall provide specialists qualified to perform the technical portion of utilization surveys...

  10. Technical Support Document: Development of the Advanced Energy Design Guide for Grocery Stores--50% Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, E. T.; Macumber, D. L.; Long, N. L.

    2008-09-01

    This report provides recommendations that architects, designers, contractors, developers, owners, and lessees of grocery store buildings can use to achieve whole-building energy savings of at least 50% over ASHRAE Standard 90.1-2004.

  11. 78 FR 48424 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... Notification AGENCY: Defense Security Cooperation Agency, Department of Defense ACTION: Notice. SUMMARY: The..., personnel training and training equipment, site surveys, Quality Assurance Teams, U.S. Government and... Teams, U.S. Government and contractor technical assistance, and other related elements of program and...

  12. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 2035.70 Contract clauses. (a) The contracting officer shall insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  13. NASA scientific and technical program: User survey

    NASA Technical Reports Server (NTRS)

    Hunter, Judy F.; Shockley, Cynthia W.

    1993-01-01

    Results are presented of an intensive user requirements survey conducted by NASA's Scientific and Technical Information (STI) Program with the goal of improving the foundation for the user outreach program. The survey was carried out by interviewing 550 NASA scientists, engineers, and contractors and by analyzing 650 individual responses to a mailed out questionnaire. To analyze the user demographic data, a data base was built and used, and will be applied to ongoing analysis by the NASA STI Program.

  14. Energy Materials Coordinating Committee (EMaCC). Annual technical report, Fiscal Year 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2002-08-01

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations.

  15. Putting EVM to the Test

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald; Counts, Stacy

    2005-01-01

    IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

  16. ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment

    NASA Technical Reports Server (NTRS)

    Boor, J. L.; Braunstein, J.; Janky, J. M.; Ogden, D.; Potter, J. G.; Harper, E. L.; Volkmer, E.; Whalen, A. A.; Henderson, E.; Hupe, H. H.

    1975-01-01

    An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.

  17. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document and to DOE Order 1300.2A. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information bymore » the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this TSL are those recorded as of July 1, 1996.« less

  18. 48 CFR 16.104 - Factors in selecting contract types.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provide the bases for negotiating contract pricing arrangements. It is essential that the uncertainties... performance or length of production run. In times of economic uncertainty, contracts extending over a relatively long period may require economic price adjustment terms. (g) Contractor's technical capability and...

  19. 78 FR 59342 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... related elements of logistical and program support. (iv) Military Department: Air Force (QAI) (v) Prior... contractor engineering, technical and logistics support services, and other related elements of logistical and program support. The estimated cost is $60 million. This proposed sale will contribute to the...

  20. 42 CFR 495.348 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor integrity, record of past performance, financial and technical resources or accessibility to other.... The grantee must maintain written standards of conduct governing the performance of its employees... employs or is about to employ any of the parties indicated herein, has a financial or other interest in...

  1. 7 CFR 4280.121 - Servicing grants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.121 Servicing grants. (a... technical merit score for the project remains the same or is higher. Prior to changing a contractor or...

  2. 7 CFR 4280.121 - Servicing grants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.121 Servicing grants. (a... technical merit score for the project remains the same or is higher. Prior to changing a contractor or...

  3. 7 CFR 4280.121 - Servicing grants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.121 Servicing grants. (a... technical merit score for the project remains the same or is higher. Prior to changing a contractor or...

  4. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  5. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  6. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  7. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  8. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  9. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  10. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  11. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  12. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  13. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  14. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  15. 7 CFR 226.22 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pertinent to the following: rationale for the method of procurement, selection of contract type, contractor... competition. The description may include a statement of the qualitative nature of the material, product or... technical resources. (i) Program procurements shall be made by one of the following methods: (1) Small...

  16. 34 CFR 472.5 - What definitions apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... division of a junior college or community college or university operating under the policies of the State... Chambers of Commerce; (4) Associations of private industry councils; and (5) Educational associations—such... Universities, or the National Association of Technical and Trade Schools. Contractor means an individual or...

  17. 34 CFR 472.5 - What definitions apply?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... division of a junior college or community college or university operating under the policies of the State... Chambers of Commerce; (4) Associations of private industry councils; and (5) Educational associations—such... Universities, or the National Association of Technical and Trade Schools. Contractor means an individual or...

  18. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  19. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  20. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  1. 75 FR 37799 - Dynamac Corporation; Transfer of Data

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... of Data AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: This notice announces...: Under Contract No. EP10H001452, the contractor shall review and/or update approximately 280 Data... Officer Representative (COR). The technical direction will provide key scientific questions and data sets...

  2. Installation restoration program. Closure assessment report for UST removals at sites 4 and 5 - petroleum, oils, and lubricants facility. Virginia Air National Guard, 192nd Fighter Group, Richmond International Airport, Sandston, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less

  3. NASA Ares I Crew Launch Vehicle Upper Stage Overview

    NASA Technical Reports Server (NTRS)

    Davusm Daniel J.; McArthur, J. Craig

    2008-01-01

    By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system.

  4. NASA Ares I Crew Launch Vehicle Upper State Overview

    NASA Technical Reports Server (NTRS)

    Davis, Daniel J.

    2008-01-01

    By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA s Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program s transportation system.

  5. Operation Slipper: The Australian Defence Force and Private Military Contractors in Afghanistan

    DTIC Science & Technology

    2015-05-21

    methodology adopted for this study. 8 Brown, “Guns for Hire.” 6 Section four presents the case...PMCs.”11 Further, Stanley’s research provides an insight into the use of PMCs from a global perspective using the supply and demand framework. Stanley...seminal work is both historical and global while providing a holistic overview of 11 Stanley

  6. A Technical Overview and Description of SOFIA (Stratospheric Observatory for Infrared Astronomy)

    NASA Technical Reports Server (NTRS)

    Kunz, Nans

    2003-01-01

    This paper provides a technical overview of SOFIA, a unique airborne observatory, from an engineering perspective. It will do this by describing several of the systems of this observatory that are common with mountain top ground based observatories but mostly emphasize those more unique features and systems that are required to facilitate world class astronomy from a highly modified Boeing 747-SP flying at Mach 0.84 in the Stratosphere. This paper provides a technical overview of SOFIA by reviewing each of the performance specifications (the level one requirements for development) and describing some of the technical advancements for the telescope as well as the platform required to achieve these performance specifications. The technical advancements involved include mirror technologies, control system features, the telescope suspension system, and the aircraft open port cavity with associated cavity door that opens in flight and tracks the telescope elevation angle. For background this paper will provide a brief programmatic overview of the SOFIA project including the joint project arrangement between the US and Germany (NASA and DLR). Additionally, this paper will describe the up to date status of the development of SOFIA as the Observatory nears the date of the first test flight in the summer of 2004.

  7. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  8. Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

    NASA Technical Reports Server (NTRS)

    Cushman, Paula P.

    1997-01-01

    Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an update flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

  9. Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

    NASA Technical Reports Server (NTRS)

    Su, Ching-Hua

    1997-01-01

    Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an updated flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

  10. Semiannual Technical Summary, 1 April-30 September 1990 (Royal Norwegian Council for Scientific and Industrial Research)

    DTIC Science & Technology

    1990-11-01

    Royal Norwegian Council for Scientific and Industrial Research (NTNF) ____ AD-A241 670 NORSAR Scientific Report No . 1-90/91 Semiannual Technical...ARPA Order No . 4138 AMD # 16 Program Code No . OF10 Name of Contractor Royal Norwegian Council for Scientific and Industrial Research Effective Date of...Advanced (If applicable) Contract No . F08606-89-C-0005 Research Projects Agency NMRO 8c. ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS

  11. Networks Technology Conference

    NASA Technical Reports Server (NTRS)

    Tasaki, Keiji K. (Editor)

    1993-01-01

    The papers included in these proceedings represent the most interesting and current topics being pursued by personnel at GSFC's Networks Division and supporting contractors involved in Space, Ground, and Deep Space Network (DSN) technical work. Although 29 papers are represented in the proceedings, only 12 were presented at the conference because of space and time limitations. The proceedings are organized according to five principal technical areas of interest to the Networks Division: Project Management; Network Operations; Network Control, Scheduling, and Monitoring; Modeling and Simulation; and Telecommunications Engineering.

  12. JOYO-1 Irradiation Test Campaign Technical Close-out, For Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. Borges

    2006-01-31

    The JOYO-1 irradiation testing was designed to screen the irradiation performance of candidate cladding, structural and reflector materials in support of space reactor development. The JOYO-1 designation refers to the first of four planned irradiation tests in the JOYO reactor. Limited irradiated material performance data for the candidate materials exists for the expected Prometheus-1 duration, fluences and temperatures. Materials of interest include fuel element cladding and core materials (refractory metal alloys and silicon carbide (Sic)), vessel and plant structural materials (refractory metal alloys and nickel-base superalloys), and control and reflector materials (BeO). Key issues to be evaluated were long termmore » microstructure and material property stability. The JOYO-1 test campaign was initiated to irradiate a matrix of specimens at prototypical temperatures and fluences anticipated for the Prometheus-1 reactor [Reference (1)]. Enclosures 1 through 9 describe the specimen and temperature monitors/dosimetry fabrication efforts, capsule design, disposition of structural material irradiation rigs, and plans for post-irradiation examination. These enclosures provide a detailed overview of Naval Reactors Prime Contractor Team (NRPCT) progress in specific areas; however, efforts were in various states of completion at the termination of NRPCT involvement with and restructuring of Project Prometheus.« less

  13. Traffic safety data : state data system quality varies and limited resources and coordination can inhibit further progress

    DOT National Transportation Integrated Search

    2010-04-01

    GAOs analysis of traffic records assessmentsconducted for states by NHTSA technical teams or contractors at least every 5 yearsindicates that the quality of state traffic safety data systems varies across the six data systems maintained by s...

  14. Fourth technical contractors' conference on peat

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-01-01

    This conference reported the status of the US Department of Energy Peat Program. The papers presented dealt with peat dewatering, international peat programs, environmental and socio-economic factors, peat gasification, peat harvesting, and the state peat surveys for 14 states. Separate abstracts were prepared for the individual papers. (CKK)

  15. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...

  16. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...

  17. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...

  18. 48 CFR 2937.602 - Elements of performance-based contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...

  19. Technical memo, project 0-6132 : task 6 - test sections in the districts.

    DOT National Transportation Integrated Search

    2011-02-01

    This Tech Memo provides a summary of the Lab Test, Distress Survey, and Construction Reports for the CAM Test Sections constructed on FM 158 (E William J. Bryan Pkwy) in the Bryan District. TTI was requested by both the Contractor (Knife River Corpor...

  20. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.

  1. NOAAPORT User's Page

    Science.gov Websites

    Update History NOAAPORT Technical Contacts NOAAPORT Program Overview NOAAPORT Reference Documentation NOAAPORT Update History - for the NOAAPORT Program. NOAAPORT Technical Contacts - NWS Technical Points of Alignment Information. Receiver Characteristics - Technical Characteristics of the NOAAPORT Receiver. Data

  2. Unlocking energy efficiency in small commercial buildings through mechanical contractors

    DOE PAGES

    Granderson, Jessica; Hult, Erin; Fernandes, Samuel; ...

    2017-03-01

    Although buildings smaller than 4,645 m 2 account for nearly half of the energy used in U.S. commercial buildings, energy-efficiency programs to date have primarily focused on larger buildings. Stakeholder interviews conducted during a scoping study by Lawrence Berkeley National Laboratory (LBNL) indicated interest in energy efficiency from the small commercial building sector, provided solutions are simple and of low cost. To address this need, an energy management package (EMP) was developed to deliver energy management to small commercial buildings via HVAC contractors, because they already serve these clients and the transaction cost to market would be reduced. This energy-managementmore » approach is unique from, but often complementary to, conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Furthermore, this paper presents an overview of the EMP, the business model to deliver it, and preliminary demonstration findings from a pilot use of the EMP. Results from the pilot validated that contractors could deliver the EMP in 4–8 h per building per year and that energy savings of 3–5% are feasible through this approach.« less

  3. Unlocking energy efficiency in small commercial buildings through mechanical contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Granderson, Jessica; Hult, Erin; Fernandes, Samuel

    Although buildings smaller than 4,645 m 2 account for nearly half of the energy used in U.S. commercial buildings, energy-efficiency programs to date have primarily focused on larger buildings. Stakeholder interviews conducted during a scoping study by Lawrence Berkeley National Laboratory (LBNL) indicated interest in energy efficiency from the small commercial building sector, provided solutions are simple and of low cost. To address this need, an energy management package (EMP) was developed to deliver energy management to small commercial buildings via HVAC contractors, because they already serve these clients and the transaction cost to market would be reduced. This energy-managementmore » approach is unique from, but often complementary to, conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Furthermore, this paper presents an overview of the EMP, the business model to deliver it, and preliminary demonstration findings from a pilot use of the EMP. Results from the pilot validated that contractors could deliver the EMP in 4–8 h per building per year and that energy savings of 3–5% are feasible through this approach.« less

  4. 77 FR 53180 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... logistical and program support. (iv) Military Department: Air Force (CCZ, Amd 7). (v) Prior Related Cases, if.... Government and contractor technical and logistics support services; and other related elements of logistical and program support. The estimated cost is $850 million. This proposed sale will contribute to the...

  5. 25 CFR 276.12 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... be given to such matters as contractor integrity, record of past performance, financial and technical... conduct which shall govern the performance of its officers, employees, or agents in contracting with and.... “Brand name or equal” description may be used as a means to define the performance or other salient...

  6. 28 CFR 34.110 - Management of peer reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Management of peer reviews. 34.110 Section 34.110 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES Peer Review § 34.110 Management of peer reviews. A technical support contractor may assist in managing...

  7. 77 FR 75766 - Federal Acquisition Regulation; Nondisplacement of Qualified Workers Under Service Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... offeror's ingenuity in proposing a technical approach or solution based on limitations of the existing... solution. Another respondent expressed concern that the rule would limit offerors' ability to craft innovative solutions to Government requirements. Response: Under the SCA, the successor contractor must pay...

  8. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The prospective NASA contractor is provided with information that describes the agency and its procurement practices. Products include ideas, manufacturing capabilities, fabricated components, construction, basic materials, and specialized services. NASA assistance in marketing these and other products is emphasized. Small and minority business enterprises are discussed. The agency's scientific and technical information activities are also discussed.

  9. 48 CFR 237.102-72 - Contracts for management services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... development or production of the major system ensures that Federal employees are responsible for determining— (1) Courses of action to be taken in the best interest of the Government; and (2) Best technical performance for the warfighter; and (c) The contract requires that the prime contractor for the contract may...

  10. 77 FR 13564 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    .... Government and contractor technical assistance and other related logistics support. \\*\\ as defined in Section... the ability to integrate the Helmet Mounted Cueing System. The software algorithms are the most sensitive portion of the AIM-9X-2 missile. The software continues to be modified via a pre- planned product...

  11. 78 FR 66865 - Acquisition Regulation: Patents, Data, and Copyrights

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... obligations under current law. The proposed changes include policy revisions for computer software developed.... Computer Software DOE's existing Rights in Technical Data-Technology Transfer clause at 970.5227-2 provides mechanisms by which computer software first produced by a DOE contractor may be made available to the public...

  12. Sensitivity of School-Performance Ratings to Scaling Decisions

    ERIC Educational Resources Information Center

    Ng, Hui Leng; Koretz, Daniel

    2015-01-01

    Policymakers usually leave decisions about scaling the scores used for accountability to their appointed technical advisory committees and the testing contractors. However, scaling decisions can have an appreciable impact on school ratings. Using middle-school data from New York State, we examined the consistency of school ratings based on two…

  13. Report: EPA’s Contract Oversight and Controls Over Personal Computers Need Improvement

    EPA Pesticide Factsheets

    Report #11-P-0705, September 26, 2011. EPA paid the CTS contractor a total of $489,734 over an 11-month period for 3,343 seats—a standard seat includes a leased computer with accessories and technical support—not ordered by the Agency during the period.

  14. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  15. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  16. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  17. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  18. Tort Suits Against Federal Contractors: An Overview of the Legal Issues

    DTIC Science & Technology

    2011-04-07

    which has subsets of its own, such as negligent misrepresentation and the doctrine of “informed consent” in medical malpractice . Broadly speaking...for failure to perform). There is also a possibility that the government could assert the state secrets privilege, thereby effectively preventing the...see CRS Report R41741, The State Secrets Privilege: Preventing the Disclosure of Sensitive National Security Information During Civil Litigation

  19. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  20. War-gaming application for future space systems acquisition part 2: acquisition and bidding war-gaming modeling and simulation approaches for FFP and FPIF

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes cooperative and non-cooperative static Bayesian game models with complete and incomplete information for the development of optimum acquisition strategies associated with the Program and Technical Baseline (PTB) solutions obtained from Part 1 of this paper [1]. The optimum acquisition strategies discussed focus on achieving "Affordability" by incorporating contractors' bidding strategies into the government acquisition strategies for acquiring future space systems. The paper discusses System Engineering (SE) frameworks, analytical and simulation approaches and modeling for developing the optimum acquisition strategies from both the government and contractor perspectives for Firm Fixed Price (FFP) and Fixed Price Incentive Firm (FPIF) contract types.

  1. A brief overview of NASA Langley's research program in formal methods

    NASA Technical Reports Server (NTRS)

    1992-01-01

    An overview of NASA Langley's research program in formal methods is presented. The major goal of this work is to bring formal methods technology to a sufficiently mature level for use by the United States aerospace industry. Towards this goal, work is underway to design and formally verify a fault-tolerant computing platform suitable for advanced flight control applications. Also, several direct technology transfer efforts have been initiated that apply formal methods to critical subsystems of real aerospace computer systems. The research team consists of six NASA civil servants and contractors from Boeing Military Aircraft Company, Computational Logic Inc., Odyssey Research Associates, SRI International, University of California at Davis, and Vigyan Inc.

  2. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.

    2004-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  3. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.; Campbell, Doug; Clampin, Mark; Decker, John; Greenhouse, Matt; Johns, Alan; Menzel, Mike; Smith, Robert; Sullivan, Pam

    2005-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  4. Semiannual Technical Summary, 1 October 1990 - 31 March 1991 (Royal Norwegian Council for Scientific and Industrial Research)

    DTIC Science & Technology

    1991-05-01

    Ronal Njorwegian Council !,r ScrerithC arid Industrial RuseIarch R A YI~L ~ AD-A242 758 NORSAR Scientific Report No . 2-90/91 Semiannual Technical...Authorization T/9141/B/PKP ARPA Order No . 4138 AMD # 16 Program Code No . OF10 Name of Contractor Royal Norwegian Council for Scientific and Industrial ...PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION Defense Advanced -- "’able) Contract No . F08606-89-C-0005 Pae~h rjsct A ..... 8c. ADDRESS (Ci-tytate

  5. One of the criteria for selecting a contractor for high-rise construction

    NASA Astrophysics Data System (ADS)

    Tuskaeva, Zalina; Tagirov, Timur

    2018-03-01

    The mechanisms for management of the building complex used and proposed to date do not always provide the required result in the assessment of the construction organization facilities. Therefore, the development of new effective methods for such an assessment is an urgent task especially in questions related to high-rise construction. The article formally sets the task of assessing the technical facilities of a construction organization. Due to the use of expert methods, the weighted values of the coefficients of local indicators for technical facilities are identified

  6. 78 FR 13030 - Applications for New Awards; Native American Career and Technical Education Program (NACTEP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Native American Career and Technical...: Notice. Overview Information: Native American Career and Technical Education Program (NACTEP). Notice... Purpose of Program: The Native American Career and Technical Education Program (NACTEP) provides grants to...

  7. Outsourcing Cataloging, Authority Work, and Physical Processing: A Checklist of Considerations.

    ERIC Educational Resources Information Center

    Kascus, Marie A., Ed.; Hale, Dawn, Ed.

    Due to automation technology, financial restrictions, and resultant downsizing, library managers have increasingly relied on the services of contractors, rather than in-house staff, to accomplish different technical services operations. Contracted services may range from a small project for a selected group of materials to a large project for…

  8. Analysis of Security Contractors in Deployed Environments

    DTIC Science & Technology

    2006-12-01

    35 2. Proper Training and Education .......................................................36 3. Improve Overall Contract Visibility...like to acknowledge the work of P. W. Singer , author of the book titled “Corporate Warriors,” whose dedicated research and thorough analysis on the...skills, including combat operations, strategic planning, intelligence, risk assessment, operational support, training , and technical skills.”3 CPFF

  9. 78 FR 6183 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-65; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... incorporated in the United States and then reincorporated in a tax haven. Item II--Extension of Sunset Date for... minimal economic impact on small businesses because the 2 percent excise tax is applied only to foreign...-011 Chambers. of Costs Associated with Foreign Contractor Excise Tax. V Technical Amendments...

  10. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  11. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  12. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  13. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  14. 48 CFR 27.406-3 - Major system acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracting officer shall review the technical data and the contractor's declaration relating to it to assure... procured by the Government and also relating to the design, development, or manufacture of products or processes offered or to be offered for sale to the public (except for such data as may be necessary for the...

  15. Technoeconomic analysis of conventional logging systems operating from stump to landing

    Treesearch

    Raymond L. Sarles; William G. Luppold; William G. Luppold

    1986-01-01

    Analyzes technical and economic factors for six conventional logging systems suitable for operation in eastern forests. Discusses financial risks and business implications for loggers investing in high-production, state-of-the-art logging systems. Provides logging contractors with information useful as a preliminary guide for selection of equipment and systems....

  16. Safety Issues at the Defense Production Reactors. A Report to the U.S. Department of Energy.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Commission on Physical Sciences, Mathematics, and Resources.

    This report provides an assessment of safety management, safety review, and safety methodology employed by the Department of Energy (DOE) and private contractors. Chapter 1, "The DOE Safety Framework," examines safety objectives for production reactors and processes to implement the objectives. Chapter 2, "Technical Issues,"…

  17. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  18. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  19. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  20. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  1. Iridium: failures & successes

    NASA Astrophysics Data System (ADS)

    Christensen, CarissaBryce; Beard, Suzette

    2001-03-01

    This paper will provide an overview of the Iridium business venture in terms of the challenges faced, the successes achieved, and the causes of the ultimate failure of the venture — bankruptcy and system de-orbit. The paper will address technical, business, and policy issues. The intent of the paper is to provide a balanced and accurate overview of the Iridium experience, to aid future decision-making by policy makers, the business community, and technical experts. Key topics will include the history of the program, the objectives and decision-making of Motorola, the market research and analysis conducted, partnering strategies and their impact, consumer equipment availability, and technical issues — target performance, performance achieved, technical accomplishments, and expected and unexpected technical challenges. The paper will use as sources trade media and business articles on the Iridium program, technical papers and conference presentations, Wall Street analyst's reports, and, where possible, interviews with participants and close observers.

  2. Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report. [systems management evaluation and design analysis

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

  3. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  4. Acquisition Logistics Guidelines for Improving the Argentine Air Force Weapon System Acquisition Process

    DTIC Science & Technology

    1999-03-01

    these kinds of sources: Industry standards Other commercial or military customers LMI specification summaries Contractor’s in-house data Section...government and industry managers to achieve program objectives. • Putting in place for fielded systems additional incentives to reduce operating and...meaning clarifications; an explanation of the roles of Congress, the Executive Branch, and Industry in defense acquisition; and an overview on the

  5. Joint Service Chemical and Biological Defense Program. FY00-02 Overview

    DTIC Science & Technology

    2001-09-01

    Development. Contractors: 12 BI DS Biological Integrated Detection System (BIDS) Lead Service Bio Road HERCULES, CA Bruker Analytical Systems BILLERICA, MA...Dynamics Land Systems Division DETROIT, MI Henschel Wehrtechnik GERMANY Bruker -Franzen GERMANY Block II – TBD Milestones Block I MS III (2QFY94) Block...ground. Accessories include hoses and hose reels, two trigger-controlled spray wands , and two electrical-powered scrub brush assemblies. The M22

  6. An overview of the Small Engine Component Technology (SECT) studies

    NASA Technical Reports Server (NTRS)

    Vanco, M. R.; Wintucky, W. T.; Niedzwiecki, R. W.

    1986-01-01

    The objectives of the joint NASA/Army SECT Studies were to identify high payoff technologies for year 2000 small gas turbine engine applications and to provide a technology plan for guiding future research and technology efforts applicable to rotorcraft, commuter and general aviation aircraft and cruise missiles. Competitive contracts were awarded to Allison, AVCO Lycoming, Garrett, Teledyne CAE and Williams International. This paper presents an overview of the contractors' study efforts for the commuter, rotorcraft, cruise missile, and auxiliary power (APU) applications with engines in the 250 to 1,000 horsepower size range. Reference aircraft, missions and engines were selected. Advanced engine configurations and cycles with projected year 2000 component technologies were evaluated and compared with a reference engine selected by the contractor. For typical commuter and rotorcraft applications, fuel savings of 22 percent to 42 percent can be attained. For $1/gallon and $2/gallon fuel, reductions in direct operating cost range from 6 percent to 16 percent and from 11 percent to 17 percent respectively. For subsonic strategic cruise missile applications, fuel savings of 38 percent to 54 percent can be achieved which allows 35 percent to 60 percent increase in mission range and life cycle cost reductions of 40 percent to 56 percent. High payoff technologies have been identified for all applications.

  7. Biological Water Quality Criteria

    EPA Pesticide Factsheets

    Page contains links to Technical Documents pertaining to Biological Water Quality Criteria, including, technical assistance documents for states, tribes and territories, program overviews, and case studies.

  8. Exploring the Benefits of Teacher-Modeling Strategies Integrated into Career and Technical Education

    ERIC Educational Resources Information Center

    Cathers, Thomas J., Sr.

    2013-01-01

    This case study examined how career and technical education classes function using multiple instructional modeling strategies integrated into vocational and technical training environments. Seven New Jersey public school technical teachers received an introductory overview of the investigation and participated by responding to 10 open-end…

  9. 77 FR 20369 - Applications for New Awards; Centers for Independent Living-Training and Technical Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... Education ACTION: Notice. Overview Information Centers for Independent Living--Training and Technical.... Funding Opportunity Description Purpose of Program The purpose of the Training and Technical Assistance grant under the Centers for Independent Living program is to provide training and technical assistance...

  10. OSH technical reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less

  11. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  12. Surface contamination analysis technology team overview

    NASA Astrophysics Data System (ADS)

    Burns, H. Dewitt, Jr.

    1996-11-01

    The surface contamination analysis technology (SCAT) team was originated as a working roup of NASA civil service, Space Shuttle contractor, and university groups. Participating members of the SCAT Team have included personnel from NASA Marshall Space Flight Center's Materials and Processes Laboratory and Langley Research Center's Instrument Development Group; contractors-Thiokol Corporation's Inspection Technology Group, AC Engineering support contractor, Aerojet, SAIC, and Lockheed MArtin/Oak Ridge Y-12 support contractor and Shuttle External Tank prime contractor; and the University of Alabama in Huntsville's Center for Robotics and Automation. The goal of the SCAT team as originally defined was to develop and integrate a multi-purpose inspection head for robotic application to in-process inspection of contamination sensitive surfaces. One area of interest was replacement of ozone depleting solvents currently used for surface cleanliness verification. The team approach brought together the appropriate personnel to determine what surface inspection techniques were applicable to multi-program surface cleanliness inspection. Major substrates of interest were chosen to simulate space shuttle critical bonding surface or surfaces sensitive to contamination such as fuel system component surfaces. Inspection techniques evaluated include optically stimulated electron emission or photoelectron emission; Fourier transform infrared spectroscopy; near infrared fiber optic spectroscopy; and, ultraviolet fluorescence. Current plans are to demonstrate an integrated system in MSFC's Productivity Enhancement Complex within five years from initiation of this effort in 1992. Instrumentation specifications and designs developed under this effort include a portable diffuse reflectance FTIR system built by Surface Optics Corporation and a third generation optically stimulated electron emission system built by LaRC. This paper will discuss the evaluation of the various techniques on a number of substrate materials contaminated with hydrocarbons, silicones, and fluorocarbons. Discussion will also include standards development for instrument calibration and testing.

  13. New Mexico Standards Based Assessment (NMSBA) Technical Report: 2006 Spring Administration

    ERIC Educational Resources Information Center

    Griph, Gerald W.

    2006-01-01

    The purpose of the NMSBA technical report is to provide users and other interested parties with a general overview of and technical characteristics of the 2006 NMSBA. The 2006 technical report contains the following information: (1) Test development; (2) Scoring procedures; (3) Calibration, scaling, and equating procedures; (4) Standard setting;…

  14. Head Start Impact Study. Technical Report

    ERIC Educational Resources Information Center

    Puma, Michael; Bell, Stephen; Cook, Ronna; Heid, Camilla; Shapiro, Gary; Broene, Pam; Jenkins, Frank; Fletcher, Philip; Quinn, Liz; Friedman, Janet; Ciarico, Janet; Rohacek, Monica; Adams, Gina; Spier, Elizabeth

    2010-01-01

    This Technical Report is designed to provide technical detail to support the analysis and findings presented in the "Head Start Impact Study Final Report" (U.S. Department of Health and Human Services, January 2010). Chapter 1 provides an overview of the Head Start Impact Study and its findings. Chapter 2 provides technical information on the…

  15. Proceedings of the International Symposium on Technical and Vocational Education (Beijing, China, September 13-18, 1993).

    ERIC Educational Resources Information Center

    Chinese National Commission for UNESCO (China).

    This document contains 28 papers: "Technical and Vocational Education in Asia and the Pacific: Regional Overview and Recent Innovations" (Muhammad Ashraf Qureshi); "Secondary Education in Austria" (Helmut Aigner); "The Development of Technical Curricula in Austria" (Helmut Aigner); "Technical and Vocational Education in Australia. Australian…

  16. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  17. Hanford Site Environmental Report for Calender Year 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poston, Ted M.; Hanf, Robert W.; Duncan, Joanne P.

    This report is prepared annually for DOE and provides an overview of activities at the Hanford Site. The report summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Although this report is primarily written to meet DOE reporting requirements and guidelines, it also provides useful summary information for the public, Indian tribes, public officials, regulatory agencies, Hanford contractors, and public officials.

  18. Measure Guideline. Air Sealing Attics in Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Otis, Casey; Maxwell, Sean

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  19. Measure Guideline: Air Sealing Attics in Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Otis, C.; Maxwell, S.

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  20. Orion European Service Module (ESM) Development, Integration and Qualification Status

    NASA Technical Reports Server (NTRS)

    Berthe, Philippe; Over, Ann P.; Picardo, Michelle; Byers, Anthony W.

    2017-01-01

    ESA and the European Industry are supplying the European Service Module for Orion. An overview of the system and subsystem configuration of the Orion European Service Module (ESM) as designed and built for the EM-1 mission is provided as well as an outline of its development, assembly, integration and verification process performed by ESA and NASA in coordination with their respective Industrial prime contractors, Airbus Defence and Space and Lockheed Martin.

  1. Ground Operations Aerospace Language (GOAL). Volume 1: Study overview

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A series of NASA and Contractor studies sponsored by NASA/KSC resulted in a specification for the Ground Operations Aerospace Language (GOAL). The Cape Kennedy Facility of the IBM Corporation was given the responsibility, under existing contracts, to perform an analysis of the Language Specification, to design and develop a GOAL Compiler, to provide a specification for a data bank, to design and develop an interpretive code translator, and to perform associated application studies.

  2. Ames Research Center publications, 1977

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This bibliography lists 786 formal NASA publications, journal articles, books, chapters of books, patents, and contractor reports which appeared during 1977 or which were not included in previous annual bibliographies. Citations are arranged by directorate, type of publication, and author. Each NASA report is identified by a technical report and accession number to facilitate ordering. An author index is provided.

  3. 48 CFR 227.7103-10 - Contractor identification and marking of technical data to be furnished with restrictive markings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... submitted as an attachment to the offer. If an offeror fails to submit the attachment or fails to complete the attachment in accordance with the requirements of the solicitation provision, such failure shall... restriction is not justified. The contract attachment shall provide the same information regarding...

  4. 77 FR 4632 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... aggregate IR&D costs or the costs of an individual IR&D project. The threshold for triggering the reporting... Agency auditor to support the allowability of the costs. Contractors that do not meet the threshold as a... provide in-process information from IR&D projects, for which reimbursement, as an allowable indirect cost...

  5. Annual Research Progress Report Number 11, 1 July 1975-30 June 1976.

    DTIC Science & Technology

    1976-07-01

    Herbert of Cherbury: A Preliminary Checklist .... ... ... ...................... 68 2. The Donne-Herbert Family Relationship ........ 68- - 3...Reflections in Organizational Strture and Managmnt Policies... ........................... 77 9. The Development of Aircraft and Doctrine in the Royal Flying...Recruit Quality and~ Its Relationship with Air Force Technical Traiin ... n ... ng ... 106 4. A Conceptual Model for Evaluating Contractor Management

  6. Methodology Report for the 1990 National Postsecondary Student Aid Study. Contractor Report. Technical Report.

    ERIC Educational Resources Information Center

    Shepherd, Jane; Malizio, Andrew G.

    The 1990 National Postsecondary Student Aid Study (NPSAS:90) is the second in a series of federally funded surveys of enrolled postsecondary students. Its key purpose is to portray accurately the characteristics of these students, particularly recipients of student aid. Results will answer questions about recipients and sources of federal and…

  7. B-WEST Regional Workforce Training Center. Building Workers Entering Skilled Trades. Employer Training Guide.

    ERIC Educational Resources Information Center

    Portland Community Coll., OR.

    This guide, which was developed during the B-WEST (Building Workers Entering Skilled Trades) project, includes materials for use in training and providing on-site consultations to contractors, managers, supervisors, office/technical staff, and others in two areas: diversity in the workplace and sexual harassment in the workplace. Part 1, which…

  8. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... fields of technology are exceptional circumstance subject inventions: (A) Uranium enrichment technology; (B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and (C... a technical field or related to a task determined by the Department of Energy to be subject to an...

  9. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... fields of technology are exceptional circumstance subject inventions: (A) Uranium enrichment technology; (B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and (C... a technical field or related to a task determined by the Department of Energy to be subject to an...

  10. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... fields of technology are exceptional circumstance subject inventions: (A) Uranium enrichment technology; (B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and (C... a technical field or related to a task determined by the Department of Energy to be subject to an...

  11. Simulation of Subpixel Atmospherically Degraded Target Detectability in Cluttered Scenes

    DTIC Science & Technology

    2013-09-06

    Number: The scientific or technical validity of this Contract Report is entirely the responsibility of the Contractor and the contents do not necessarily...September 6th 2012 and September 6th 2013. Results: Significant and representative cases are modeled and results are presented in an annex of the...3 4 Modeling an image degraded by the atmosphere

  12. 78 FR 22366 - Proposed Information Collection (Technical Industry Standards) Activity: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... Underwriters Laboratory (UL) or the National Fire Protection Association. Contractor must furnish evidence to... item, such as the UL tag on an electrical cord or a tag on a fire-rated door. Items that do not meet the standards or not previously tested must come with a certificate from an acceptable laboratory...

  13. SUMMARY REPORT FOR THE NATIONAL ATMOSPHERIC DEPOSITION PROGRAM/NATIONAL TRENDS NETWORK (NADP/NTN) SITE VISITATION PROGRAM FOR THE PERIOD OCTOBER 1987 THROUGH SEPTEMBER 1988

    EPA Science Inventory

    The U.S Environmental Protection Agency (EPA) provides technical assistance to the NADP/NTN network through a site visitation program. esearch Triangle Institute, as contractor to EPA, conducts these visits. f deficiencies or nonstandard procedures are noted, the site operator an...

  14. Government-Industry Data Exchange Program (GIDEP)

    NASA Technical Reports Server (NTRS)

    Richards, E. T.

    1974-01-01

    The Government-Industry Data Exchange Program (GIDEP) was originated in 1959 by the Army, Navy, and Air Force Ballistic Missile Agencies. Known at that time as IDEP--Interservice Data Exchange Program--its intent was to eliminate duplicate testing of parts and components by disseminating pertinent test data among Department of Defense contractors and various government agencies. In 1966 both the National Aeronautics and Space Administration and the Canadian Military Electronics Standards Agency (CAMESA) recognized the value of the data provided by the program and became participants. Today, GIDEP provides the interchange of specialized technical data to all the military services, participating government contractors and numerous government agencies such as the Atomic Energy Commission, Federal Aviation Administration, Defense Supply Agency, and the Small Business Administration.

  15. 78 FR 40459 - Applications for New Awards; Technical Assistance and Dissemination To Improve Services and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Technical Assistance and Dissemination To... AGENCY: Office of Special Education and Rehabilitative Services, Office of Elementary and Secondary Education, Department of Education. ACTION: Notice. Overview Information Technical Assistance and...

  16. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  17. Technical skills requirement of Indonesian construction labors to work in Malaysia

    NASA Astrophysics Data System (ADS)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  18. Maintaining the program balance, volumes 1 and 2

    NASA Technical Reports Server (NTRS)

    Finger, Harold

    1991-01-01

    In March of 1990, the NASA Administrator asked the Academy to perform a study to address the following questions: (1) has NASA contracted too much of its technical work; (2) has NASA's in-house technical capability eroded over time; (3) is in-house engineering and scientific work important to the development of scientists and engineers; and (4) is NASA still able to attract quality scientists and engineers. A panel from the Academy addressed each question separately and came up with the following recommendations: (1) prepare and issue guidance on technical functional areas reserved for in-house performance; (2) convert contracted technical functions to in-house performance if critical to agency programs; (3) provide policy guidance to the centers to retain in-house projects; (4) examine the project mix at each center against agency goals and objectives; (5) institute an annual critical review for all technical disciplines; (6) modify the agency's contractor accountability process; and (7) seek opportunities for greater delegation of resources and technical decision making.

  19. Common Data Acquisition Systems (DAS) Software Development for Rocket Propulsion Test (RPT) Test Facilities - A General Overview

    NASA Technical Reports Server (NTRS)

    Hebert, Phillip W., Sr.; Hughes, Mark S.; Davis, Dawn M.; Turowski, Mark P.; Holladay, Wendy T.; Marshall, PeggL.; Duncan, Michael E.; Morris, Jon A.; Franzl, Richard W.

    2012-01-01

    The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition system (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis' development and deployment.

  20. 76 FR 4645 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Department...: This notice announces a meeting of the Hydrogen and Fuel Cell Technical Advisory Committee (HTAC). HTAC... Presentations HTAC Subcommittee Overviews HTAC Annual Report Development Stationary Fuel Cell Industry Analysis...

  1. First Chance Network and Technical Assistance

    ERIC Educational Resources Information Center

    Trohanis, Pascal L.

    1973-01-01

    Article seeks to cover the following topics: an overview of First Chance; a description of TADS (Technical Assistance Development System); and a discussion of the organization's Media and Information division. (Author)

  2. The Defense Technical Information Center: Acquiring Information and Imparting Knowledge.

    ERIC Educational Resources Information Center

    Molholm, Kurt N.; And Others

    1988-01-01

    This overview of the Defense Technical Information Center (DTIC) discusses how DTIC fits into the Department of Defense Scientific and Technical Information Program; its history, organization, users, and operations; types of information handled; subject classification; cataloging standards; Information Analysis Centers (IACs); and research and…

  3. Overviews of the Apollo Program and Its Management

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This special bibliography includes items individually selected by scientific and technical information professionals that provide an overview of the history, events, and results of the Apollo missions. Planning, scheduling, and management are also included.

  4. An overview of the small engine component technology (SECT) studies. [commuter, rotorcraft, cruise missile and auxiliary power applications in year 2000

    NASA Technical Reports Server (NTRS)

    Vanco, M. R.; Wintucky, W. T.; Niedwiecki, R. W.

    1986-01-01

    The objectives of the joint NASA/Army SECT studies were to identify high payoff technologies for year 2000 small gas turbine engine applications and to provide a technology plan for guiding future research and technology efforts applicable to rotorcraft, commuter and general aviation aircraft and cruise missiles. Competitive contracts were awarded to Allison, AVCO Lycoming, Garrett, Teledyne CAE and Williams International. This paper presents an overview of the contractors' study efforts for the commuter, rotorcraft, cruise missile, and auxiliary power (APU) applications with engines in the 250 to 1,000 horsepower size range. Reference aircraft, missions and engines were selected. Advanced engine configurations and cycles with projected year 2000 component technologies were evaluated and compared with a reference engine selected by the contractor. For typical commuter and rotorcraft applications, fuel savings of 22 percent to 42 percent can be attained. For $1/gallon and $2/gallon fuel, reductions in direct operating cost range from 6 percent to 16 percent and from 11 percent to 17 percent respectively. For subsonic strategic cruise missile applications, fuel savings of 38 percent to 54 percent can be achieved which allows 35 percent to 60 percent increase in mission range and life cycle cost reductions of 40 percent to 56 percent. High payoff technologies have been identified for all applications.

  5. Naval Petroleum and Oil Shale Reserves Combined Financial Statements September 30, 1994 and 1993 and Management Overview and Supplemental Financial and Management Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s (Department) Naval Petroleum and Oil Shale Reserves (NPOSR) financial statements as of September 30, 1994. The auditors have expressed an unqualified opinion on the 1994 statements. Their reports on the NPOSR internal control structure and on compliance with laws and regulations, and management letter on addressing needed improvements are also provided. NPOSR consists of petroleum reserves in California and Wyoming, and oil shale reserves in Colorado and Utah. The Government`s interests in NPOSR are managed by the Department through its headquarters office inmore » Washington, D.C. In addition, the Department has site offices in both California and Wyoming that are responsible for contractor oversight functions. Daily operations are conducted under contract by two management and operating contractors. By law, NPOSR was authorized to produce crude oil at the maximum efficient rate for six years. The law allowed production to be extended for three year periods, provided that the President of the United States certified that continued maximum production was in the best interest of the nation. The current three year period ends on April 5, 1997. Additional information about NPOSR is provided in the overview and notes to the financial statements.« less

  6. Development of NASA Technical Standards Program Relative to Enhancing Engineering Capabilities

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2003-01-01

    The enhancement of engineering capabilities is an important aspect of any organization; especially those engaged in aerospace development activities. Technical Standards are one of the key elements of this endeavor. The NASA Technical Standards Program was formed in 1997 in response to the NASA Administrator s directive to develop an Agencywide Technical Standards Program. The Program s principal objective involved the converting Center-unique technical standards into Agency wide standards and the adoption/endorsement of non-Government technical standards in lieu of government standards. In the process of these actions, the potential for further enhancement of the Agency s engineering capabilities was noted relative to value of being able to access Agencywide the necessary full-text technical standards, standards update notifications, and integration of lessons learned with technical standards, all available to the user from one Website. This was accomplished and is now being enhanced based on feedbacks from the Agency's engineering staff and supporting contractors. This paper addresses the development experiences with the NASA Technical Standards Program and the enhancement of the Agency's engineering capabilities provided by the Program s products. Metrics are provided on significant aspects of the Program.

  7. Developing Effective Linkages between Job Corps and One-Stop Systems: A Technical Assistance Guide.

    ERIC Educational Resources Information Center

    Dickinson, Katherine; Soukamneuth, Sengsouvanh

    This document is intended to help Job Corps centers and Office of Acquisition Policy contractors establish linkages with one-stop systems. Chapter 1 summarizes the requirements for linkages between Job Corps and one-stop systems that are specified in the Workforce Investment Act (WIA) of 1998 and compares one-stop delivery systems before and under…

  8. High School and Beyond Transcripts Survey (1982). Data File User's Manual. Contractor Report.

    ERIC Educational Resources Information Center

    Jones, Calvin; And Others

    This data file user's manual documents the procedures used to collect and process high school transcripts for a large sample of the younger cohort (1980 sophomores) in the High School and Beyond survey. The manual provides the user with the technical assistance needed to use the computer file and also discusses the following: (1) sample design for…

  9. The Evaluation of Less-Lethal Weapons

    DTIC Science & Technology

    1977-12-01

    following contractor personnel made mijor contributions: W. Busty (Experimental Pathology Laboratories, Inc) A. Tiedemann. I r (AAI, Inc) L. Wiliiams ...matter, participated. The objectives of tile conference were: a. To review the problems and policy issues concerning nonlethal weapons for law enforcement...and related uses, and, b. to develop recommendations for research and development priorities for addressing these technical and policy issues . The

  10. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  11. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  12. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  13. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  14. Hanford internal dosimetry program manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, E.H.; Sula, M.J.; Bihl, D.E.

    1989-10-01

    This document describes the Hanford Internal Dosimetry program. Program Services include administrating the bioassay monitoring program, evaluating and documenting assessments of internal exposure and dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating internal radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. 13 refs., 16 figs., 42 tabs.

  15. REDUCED PROTECTIVE CLOTHING DETERMINATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BROWN, R.L.

    2003-06-13

    This technical basis document defines conditions where reduced protective clothing can be allowed, defines reduced protective clothing, and documents the regulatory review that determines the process is compliant with the Tank Farm Radiological Control Manual (TFRCM) and Title 10, Part 835, of the Code of Federal Regulations (10CFR835). The criteria, standards, and requirements contained in this document apply only to Tank Farm Contractor (TFC) facilities.

  16. Proceedings of the DOE chemical/hydrogen energy contractor review systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Chemical/hydrogen energy system contracts were reviewed. The review served as an effective means to (1) give all contracts an insight into the background and objectives of thirty-nine hydrogen-related tasks, (2) show the status of the studies or technical effort, (3) relate any problems that had impeded the progress, and (4) state projected solutions for resolving the identified problems.

  17. A Case Study on the Status of Technical and Vocational Education in Thailand. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Shoolap, Charoon; Choomnoom, Siripan

    This two-part report presents an overview of the vocational and technical education system in Thailand. The first part is a review of the current and likely future situations pertaining to vocational and technical education in that country. An analysis of economic conditions, human resource development, and the existing technical and vocational…

  18. 75 FR 34251 - Office of Special Education and Rehabilitative Services; Overview Information; Centers for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... Information; Centers for Independent Living Program--Training and Technical Assistance; Notice Inviting... Training and Technical Assistance Project. Program Authority: 29 U.S.C. 796f(b); American Recovery and... Independent Living Program--Training and Technical Assistance--CFDA Number 84.400B must be submitted...

  19. 75 FR 9193 - Office of Special Education and Rehabilitative Services; Overview Information; Assistive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Information; Assistive Technology Act of 1998, as Amended--National Activities--State Training and Technical... requirement to support training and technical assistance to the entities funded under the AT Act to improve... applications that meet this priority. This priority is: State Training and Technical Assistance for Assistive...

  20. Preparing Workforce 2000 through Vocational Technical 2+2 Programs.

    ERIC Educational Resources Information Center

    Portland Area Vocational-Technical Education Consortium, OR.

    An overview is provided of the 1989 accomplishments of the Portland Area Vocational Technical Education Consortium (PAVTEC), which was created to strengthen partnerships between Portland Community College (PCC) and local high schools to provide high quality articulated vocational-technical programs. The first section looks at the roles of PAVTEC,…

  1. An Overview of Clarkson's Technical Communications Program.

    ERIC Educational Resources Information Center

    Barkman, Patricia R.

    The technical communications program at Clarkson College (New York) offers students 23 courses in subjects ranging from interpersonal behavior to engineering and scientific report writing to computer documentation and the development of technical manuals. With the help of an advisor, each student works out a course of study appropriate to his or…

  2. A Guide to Locating Technical Reports in U.S. Government Publications Collections. Metrodocs Monograph One. First Edition.

    ERIC Educational Resources Information Center

    Hardick, Mary

    This guide is designed to provide aid and support to library staff in finding government scientific and technical reports. Following an introduction to bibliographic sources for the technical report literature, the guide outlines a general search strategy for the retrieval of technical reports and presents an overview of the following five major…

  3. Overview of Avionics and Electrical Ground Support Equipment

    NASA Technical Reports Server (NTRS)

    Clarke, Sean C.

    2011-01-01

    Presents an overview of the Crew Module Avionics and the associated Electrical Ground Support Equipment for the Pad Abort 1 flight test of the Orion Program. A limited selection of the technical challenges and solutions are highlighted.

  4. Gagne's Learning Theory Applied to Technical Instruction

    ERIC Educational Resources Information Center

    Lawson, Tom E.

    1974-01-01

    An overview of Robert M. Gagne's theoretical position of learning and instruction is presented with a discussion of possible applications and usefulness of the theory toward the development of technical instruction. (Author/AG)

  5. Goddard Geophysical and Astronomical Observatory

    NASA Technical Reports Server (NTRS)

    Covey, Rawland; Kodak, Charles

    1999-01-01

    This report summarizes the technical parameters and the technical staff of the VLBI system at GGAO. It also gives an overview of VLBI activities during the previous year. The outlook lists the tasks planned for 1999.

  6. Industry perspectives on Plug-& -Play Spacecraft Avionics

    NASA Astrophysics Data System (ADS)

    Franck, R.; Graven, P.; Liptak, L.

    This paper describes the methodologies and findings from an industry survey of awareness and utility of Spacecraft Plug-& -Play Avionics (SPA). The survey was conducted via interviews, in-person and teleconference, with spacecraft prime contractors and suppliers. It focuses primarily on AFRL's SPA technology development activities but also explores the broader applicability and utility of Plug-& -Play (PnP) architectures for spacecraft. Interviews include large and small suppliers as well as large and small spacecraft prime contractors. Through these “ product marketing” interviews, awareness and attitudes can be assessed, key technical and market barriers can be identified, and opportunities for improvement can be uncovered. Although this effort focuses on a high-level assessment, similar processes can be used to develop business cases and economic models which may be necessary to support investment decisions.

  7. Nevada applied ecology group publications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chilton, B.D.; Pfuderer, H.A.; Cox, T.L.

    Since January 1972, the Nevada Applied Ecology Information Center (NAEIC), Information Research and Analysis Section, Health and Safety Research Division, Oak Ridge National Laboratory, has provided technical information support to the Nevada Applied Ecology Group (NAEG) relevant to the behavior of specific radionuclides, primarily plutonium and americium, in the environment, with special emphasis on pathways to man. This bibliography represents a summary of the biomedical and environmental studies conducted by the NAEG and its contractors. The bibliography focuses on research sponsored by the NAEG. Subject areas of the publications include cover studies of soil, vegetation, animals, microorganisms, resuspension, and meteorology.more » All references in this publication are stored in a computerized form that is readily available for searches upon request to NAEG and it contractors. 558 refs.« less

  8. 2007 NASA Seal/Secondary Air System Workshop. Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M.; Hendricks, Robert C.; Delgado, Irebert

    2008-01-01

    The 2007 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA's new Orion project aimed at developing a new spacecraft that will fare astronauts to the International Space Station, the Moon, Mars, and beyond; (ii) Overview of NASA's fundamental aeronautics technology project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA's turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakage as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Turbine seal development topics covered include a method for fast-acting HPT blade tip clearance control, noncontacting low-leakage seals, intershaft seals, and a review of engine seal performance requirements for current and future Army engine platforms.

  9. 2008 NASA Seal/Secondary Air System Workshop

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor); Delgado, Irebert R. (Editor)

    2009-01-01

    The 2008 NASA Seal/Secondary Air System Workshop covered the following topics: (i) Overview of NASA s new Orion project aimed at developing a new spacecraft that will fare astronauts to the International Space Station, the Moon, Mars, and beyond; (ii) Overview of NASA s fundamental aeronautics technology project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakage as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Turbine seal development topics covered include a method for fast-acting HPT blade tip clearance control, noncontacting low-leakage seals, intershaft seals, and a review of engine seal performance requirements for current and future Army engine platforms.

  10. STRATEGIES FOR OPTIMIZING THE APPLICATION OF MEDIA TO VOCATIONAL AND TECHNICAL EDUCATION CURRICULA.

    ERIC Educational Resources Information Center

    CHRISTENSEN, VIRGIL E.; TAYLOR, ROBERT E.

    THE ASSUMPTION IS MADE THAT VOCATIONAL AND TECHNICAL EDUCATION IS "UNDEVELOPED" IN TERMS OF ADEQUATELY EXPLOITING THE FULL RANGE OF POSSIBILITIES INHERENT IN MODERN EDUCATIONAL MEDIA AND TECHNOLOGY. THIS PAPER PRESENTS AN OVERVIEW OF THE BROAD SETTING IN WHICH VOCATIONAL AND TECHNICAL EDUCATION FUNCTIONS, THE GENERAL BENEFITS OF APPLICATIONS OF…

  11. Project T.E.A.M. (Technical Education Advancement Modules). Fundementals of Workplace Integration.

    ERIC Educational Resources Information Center

    Kraeling, Vicki

    This module is one of a series of instructional guides developed by Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training for unemployed, underemployed, and existing industrial employees whose basic technical skills are in need of upgrading. The module is a 27-hour overview course…

  12. Evaluation and Information in the Field of Technical Aids for Disabled Persons: An European Perspective. Monograph Number Thirty-Five.

    ERIC Educational Resources Information Center

    Pedotti, Antonio, Ed.; Andrich, Renzo, Ed.

    The monograph provides information on evaluation of technical aids, wheelchairs, and computerized information systems for disabled persons. The first chapter provides a general overview of actions of the European Community concerning technical aids evaluation, information on the "Concerted Action" program called "Evaluation of…

  13. Advanced Technical Drafting (Industrial Arts) Curriculum Guide. Bulletin 1751.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum guide contains materials for a 17-unit course in advanced technical drafting, a followup to the basic technical drafting course in the industrial arts curriculum for grades 10-12. It is intended for use by industrial arts teachers, supervisors, counselors, administrators, and teacher educators. A three-page course overview provides…

  14. Philosophical and Sociological Overview of Vocational Technical Education in Nigeria

    ERIC Educational Resources Information Center

    Kennedy, Odu Oji

    2012-01-01

    Vocational Technical Education is any kind of education which has the main purpose of preparing one for employment in recognized occupation. The foundation of vocational technical education is based on philosophy which was mainly established for self-employment and self-reliance of the individual(s) who partake in it. Viewing the philosophy and…

  15. Central Radar System, Over-the-Horizon Backscatter

    DTIC Science & Technology

    1990-03-09

    1,2-Dibromo-3- chloropropane (DBCP) 0.3 TABLE 41-6 (Continued). MINNESOTA RECOMMENDED ALLOWABLE LIMITS (RAL) FOR DRINKING WATER WELLS Compound RAL (ug/ 1 ...TABLE OF CONTENTS ENVIRONMENTAL IMPACT ANALYSIS PROCESS OVERVIEW ............ TECHNICAL STUDY 1 FACILITIES...TECHNICAL STUDY 10 0 TECHNICAL STUDY 1 CENTRAL RADAR SYSTEM OVER-THE-HORIZON BACKSCATTER RADAR PROGRAM 0 ENVIRONMENTAL IMPACT

  16. Hanford Site Environmental Report for Calendar Year 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

    This report is prepared annually to satisfy the requirements of DOE Orders. The report provides an overview of activities at the Hanford Site during 2002 and demonstrates the site's compliance with applicable federal, state, and local environmental laws, regulations, executive orders, and DOE policies; and to summarize environmental data that characterize Hanford Site environmental management performance. The purpose of the report is to provide useful summary information to members of the public, public officials, regulators, Hanford contractors, and elected representatives.

  17. Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    In a single year, energy-efficient product purchases could save the federal government almost a half billion dollars worth of energy. By purchasing products that exceed the minimum required efficiency levels, buyers can save the government even more energy and money. Federal employees and contractors must take an active role in ensuring that the government receives products that meet efficiency requirements. This document provides an overview of product purchasing requirements and shows you how to write compliant contracts, find funding, and confirm product compliance.

  18. In Vivo Monitoring Program Manual, PNL-MA-574

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2010-07-01

    An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

  19. Nevada Applied Ecology Information Center: a review of technical information support provided to the Nevada Applied Ecology Group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fore, C.S.; Pfuderer, H.A.

    The Nevada Applied Ecology Information Center (NAEIC) was established in January 1972 to serve the needs of the Nevada Applied Ecology Group (NAEG) by identifying, collecting, analyzing, and disseminating technical information relevant to NAEG programs. Since its inception, the NAEIC has been active in providing specialized information support to NAEG staff in the following research areas: (1) environmental aspects of the transuranics; (2) historic literature (pre-1962) on plutonium and uranium; (3) cleanup and treatment of radioactively contaminated land; (4) bioenvironmental aspects of europium and rhodium; (5) NAEG contractor reports; and (6) uptake of radioactivity by food crops.

  20. Panel to review EOSDIS plans

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

  1. Overview of the Main Propulsion System for the NASA Ares I Upper Stage

    NASA Technical Reports Server (NTRS)

    Quinn, Jason E.; Swanson, Luke A.

    2009-01-01

    A functional overview of the Main Propulsion System (MPS) of the NASA Ares I Upper Stage is provided. In addition to a simple overview of the key MPS functions and design philosophies, major lessons learned are discussed. The intent is to provide a technical overview with enough detail to allow engineers outside of the MPS Integrated Product Team (IPT) to develop a rough understanding of MPS operations, components, design philosophy, and lessons learned.

  2. Geospace Plasma Dynamics Laboratory Annual Task Report (FY11)

    DTIC Science & Technology

    2012-03-01

    Site Contractors: Nagendra Singh, Ph.D., Physicist , 0.5 MY Neil Grossbard, M.S., Mathematician , 0.7 MY Visitors: Publications: Articles in...PhD Project Manager Division Chief, RVB This report is published in the interest of scientific and technical...Annual Task Report (FY11) 5c. PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) 5d. PROJECT NUMBER 2311 Daniel Ober 5e. TASK NUMBER

  3. Acquisition Workforce Strategy: The Challenge Department of Defense (DoD) Faces to Improve its Acquisition Workforce

    DTIC Science & Technology

    2011-12-01

    Personnel Trends Relevant to Policy, 1993–2006. Santa Monica, CA: RAND Corporation/TR-572-OSD, by Gates, Susan M., Edward G. Keating , Adria D...settlement of contracts and subcontracts. Duties include evaluating information about contractor economic assertions, comparing those assertions to...Quality, and Manufacturing Acquisition-related manufacturing and production duties vary greatly in managerial , administrative, and technical

  4. Contract Source Selection: An Analysis of Lowest Price Technically Acceptable and Tradeoff Strategies

    DTIC Science & Technology

    2016-06-15

    selection strategy is key to minimizing risk and ensuring best value for all stakeholders. On the basis of thorough market research , acquisition...administrative lead-time, Contractor Performance Assessment Reporting System ratings, and earned value management assessments) and source selection strategy ...Postgraduate School A. PURPOSE This research analyzes LPTA and tradeoff source selection strategies and contract outcomes to determine if a relationship

  5. Chemical Stockpile Disposal Program. Monitoring Concept Plan

    DTIC Science & Technology

    1987-09-10

    Government Owned Contractor Operated GPL General Population Limit H Bis (2-chloroethyl) sulfide or Levinstein Mustard (75% purity) P HCI Hydrogen Chloride... government agencies, will provide technical expertise and equipment necessary to monitor affected areas and resources. 2-25 SECTIO 3 PROCESS CONTROL AND...conditions and to issue correct emergency response notifications, if required. The process sensors work in conjunction with the process control system and

  6. Data Rights Valuation in Software Acquisitions

    DTIC Science & Technology

    2012-09-01

    Practices (A. Krattiger et al.). MIHR (Oxford, UK), PIPRA (Davis, USA), Oswaldo Cruz Foundation (Fiocruz, Rio de Janeiro , Brazil), and bioDevelopments...are generally conveyed with software de - liverables (e.g., government purpose rights may be conveyed instead of only restricted rights to software...needed to purchase C-130J spare parts through competitive procurements. When the prime contractor de - clined to provide a technical data rights package

  7. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  8. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  9. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  10. Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hult, Erin; Granderson, Jessica; Mathew, Paul

    While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hourmore » onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.« less

  11. Exploring the Mismatch between Skills and Jobs for Women in Saudi Arabia in Technical and Vocational Areas: The Views of Saudi Arabian Private Sector Business Managers.

    ERIC Educational Resources Information Center

    Calvert, John R.; Al-Shetaiwi, A. S.

    2002-01-01

    Gives an overview of women in both general and technical-vocational education and employment in Saudi Arabia. Reports on a survey of 220 private business managers: 83% indicated that Saudi women had limited participation in technical jobs; 63% suggested that vocational-technical education did not promote women's participation. (Contains 51…

  12. AHMCT Intelligent Roadway Information System (IRIS) technical support and testing

    DOT National Transportation Integrated Search

    2011-12-31

    This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...

  13. AHMCT Intelligent Roadway Information System (IRIS) technical support and testing.

    DOT National Transportation Integrated Search

    2011-12-01

    This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...

  14. Active Rack Isolation System Program and Technical Status

    NASA Technical Reports Server (NTRS)

    Bushnell, Glenn; Fialho, Ian; Allen, James; Quraishi, Naveed

    2000-01-01

    The Boeing Active Rack Isolation System (ARIS) is one of the means used to isolate acceleration-sensitive scientific experiments from structurally transmitted disturbances aboard the International Space Station. The presentation provides an overview of ARIS and technical issues associated with the development of the active control system. An overview of ARIS analytical models is presented along with recent isolation performance predictions made using these models. Issues associated with commanding and capturing ARIS data are discussed and possible future options based on the ARIS ISS Characterization Experiment (ICE) Payload On-orbit Processor (POP) are outlined. An overview of the ARIS-ICE experiment scheduled to fly on ISS Flight 6A is presented. The presentation concludes with a discussion of recent- developmental work that includes passive rack damping, umbilical redesigns and advanced multivariable control design methods.

  15. The Role of Project Science in the Chandra X-Ray Observatory

    NASA Technical Reports Server (NTRS)

    O'Dell, Stephen L.; Weisskopf, Martin C.

    2006-01-01

    The Chandra X-Ray Observatory, one of NASA's Great Observatories, has an outstanding record of scientific and technical success. This success results from the efforts of a team comprising NASA, its contractors, the Smithsonian Astrophysical Observatory, the instrument groups, and other elements of the scientific community, including thousands of scientists who utilize this powerful facility for astrophysical research. We discuss the role of NASA Project Science in the formulation, development, calibration, and operation of the Chandra X-ray Observatory. In addition to representing the scientific community within the Project, Project Science performed what we term "science systems engineering". This activity encompasses translation of science requirements into technical requirements and assessment of the scientific impact of programmatic and technical trades. We briefly describe several examples of science systems engineering conducted by Chandra Project Science.

  16. Military standards and SCATHA program update of MIL-STD-1541

    NASA Technical Reports Server (NTRS)

    Frankos, D. T.

    1980-01-01

    The elctromagnetic compatability requirements for space systems, 15 October 1973, to be met by industry contractors for spacecraft launch vehicles and other special space systems, are considered. Deficiencies in the existing standard with respect to spacecraft charge and discharge phenomena, the technical ramifications for generating a new standard, and the upgrading of MIL-STD-1541 with requirements supplied as a result of the SCATHA program are discussed.

  17. Environmental Impact Statement for Proposed Closure of Los Angeles Air Force Base, California and Relocation of Space Systems Division

    DTIC Science & Technology

    1990-05-01

    FFRDC); and the Systems Engineering Technical Assistance (SETA) contractor to selected Air Force bases including: Vandenberg AFB California; March AFB...05/21/90 comptroller, acquisition civil engineering , legal, security, communications-computer systems, product assurance, and safety, among others...housing units were constructed in 1983. The Fort MacArthur Housing Area also includes administrative offices, several warehouses, and civil engineering

  18. Body and Surface Wave Modeling of Observed Seismic Events

    DTIC Science & Technology

    1980-09-30

    8217 r t ; i S i y- i k« ^ _^_____ , .. , . -.-..-.:. mi& ANNUAL TECHNICAL REPORT 1 October 1979 - 30 September 1980 BODY... 30 September 1980 ARPA Order No: Program Code: Name of Contractor: Effective Date of Contract; Contract Expiration Date: Amount of Contract...Technology 1 October 1979 30 September 1980 $150,000 F49620-77-C-0022 David G. Harkrider (213) 356-6910 Donald V. Helmberger (213) 356-6911 J

  19. Training and Competitiveness in U.S. Manufacturing and Services: Training Needs and Practices of Lead Firms in Textile, Banking, Retailing and Business Services. Contractor Report.

    ERIC Educational Resources Information Center

    Noyelle, Thierry; Bailey, Thomas

    Changing employer-based training represents one strategy that U.S. firms are adopting to confront recent transformations in the global economy. The new competitive conditions place new and different demands on workers, more of whom are being called upon to use technical, conceptual, and communications skills. Approaches to training in particular…

  20. Integrated System Safety Program for the MX Weapon System.

    DTIC Science & Technology

    1979-09-25

    Quantitative AnalIsis Of Specified Undesired Events Nuclr Safey Anisis Reports ISARI Contractor Inpu To AFWL Technical Nucler Sa An. Is FIGURE 1...Launch Includes all functions from initiation of launch se- quence to missile first motion, such as transfer from ground power to airborne power ...all credible contingency or emergency condi- tions, such as Toxic gases/fluid release, inadvertently armed ordnance, electric power loss, and destruct

Top