Sample records for technical overview contractor

  1. Solar 101 Webinar Series: Solar Technical Assistance Overview and

    Science.gov Websites

    Technical Assistance Overview and Applications Solar 101 Webinar Series: Solar Technical Assistance Overview and Applications Wednesday, March 5, 2014, 2-3 p.m. EST NREL's Solar Technical Assistance Team (STAT ) presented a live webinar titled, "Solar Technical Assistance Overview and Applications." This

  2. 40 CFR 35.4205 - How does my group procure a technical advisor or any other contractor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How does my group procure a technical... PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4205 How does my group...

  3. Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments

    DTIC Science & Technology

    2010-08-16

    contractors].”). 17 48 C.F.R. § 9.402(b) (“The serious nature of debarment and suspension requires that these sanctions be imposed only in the public...CRS Report for Congress Prepared for Members and Committees of Congress Debarment and Suspension of Government Contractors: An Overview...control number. 1. REPORT DATE 16 AUG 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Debarment and Suspension

  4. 48 CFR 227.7103-10 - Contractor identification and marking of technical data to be furnished with restrictive markings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and marking of technical data to be furnished with restrictive markings. 227.7103-10 Section 227.7103... DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-10 Contractor identification and marking of technical data to be furnished with restrictive markings...

  5. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established... procedures for protecting technical data delivered to or stored at the repository from unauthorized release... disclosure of technical data from the repository to third parties consistent with the Government's rights in...

  6. 48 CFR 227.7103-11 - Contractor procedures and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Rights in Technical Data 227.7103-11 Contractor procedures and records. (a) The clause at 252.227-7013, Rights in Technical Data—Noncommercial Items, requires a contractor, and its subcontractors or suppliers that will deliver technical data with other than unlimited rights, to establish and follow written...

  7. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section III, Block 19, generally mean— (A) Technical capability. An assessment of the prospective contractor's key management personnel to determine if they have the basic technical knowledge, experience... completion. This includes— (1) An assessment of the prospective contractor's possession of, or the ability to...

  8. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  9. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  10. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  11. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  12. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  13. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  14. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  15. Truck side guard technical overview : safety and operational considerations

    DOT National Transportation Integrated Search

    2015-04-23

    This technical overview provides safety and operational considerations for truck side guards. Truck side guards are designed to keep pedestrians, bicyclists, and motorcyclists - known as vulnerable road users (VRUs) from being run over by a large tru...

  16. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  17. A Technical Overview and Description of SOFIA (Stratospheric Observatory for Infrared Astronomy)

    NASA Technical Reports Server (NTRS)

    Kunz, Nans

    2003-01-01

    This paper provides a technical overview of SOFIA, a unique airborne observatory, from an engineering perspective. It will do this by describing several of the systems of this observatory that are common with mountain top ground based observatories but mostly emphasize those more unique features and systems that are required to facilitate world class astronomy from a highly modified Boeing 747-SP flying at Mach 0.84 in the Stratosphere. This paper provides a technical overview of SOFIA by reviewing each of the performance specifications (the level one requirements for development) and describing some of the technical advancements for the telescope as well as the platform required to achieve these performance specifications. The technical advancements involved include mirror technologies, control system features, the telescope suspension system, and the aircraft open port cavity with associated cavity door that opens in flight and tracks the telescope elevation angle. For background this paper will provide a brief programmatic overview of the SOFIA project including the joint project arrangement between the US and Germany (NASA and DLR). Additionally, this paper will describe the up to date status of the development of SOFIA as the Observatory nears the date of the first test flight in the summer of 2004.

  18. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  19. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  20. 77 FR 32129 - Notice of Proposed Information Collection; Comment Request: Multifamily Contractor's/Mortgagor's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... Information Collection; Comment Request: Multifamily Contractor's/Mortgagor's Cost Breakdowns and..., Technical Support, Office of Multifamily Housing Development, Department of Housing and Urban Development... also lists the following information: Title of Proposal: Multifamily Contractor's/Mortgagor's Cost...

  1. Gender Issues in Technical Communication Studies: An Overview of the Implications for the Profession, Research, and Pedagogy.

    ERIC Educational Resources Information Center

    Allen, Jo

    1991-01-01

    Presents an overview of research and unanswered questions related to gender issues in technical communication. Addresses the consequences of the feminization of technical communication, research on gender differences in technical communication, and the means for encouraging a more gender-balanced view of business and industry. (SR)

  2. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  3. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  4. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  5. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  6. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  7. Contractor evaluations in the contractor selection process.

    DOT National Transportation Integrated Search

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  8. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less

  9. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23... feasibility study yourself or though a contractor, Reclamation will evaluate whether you, your technical staff, or contractor are qualified to perform the appraisal investigation or feasibility study based on...

  10. 48 CFR 245.603-70 - Contractor performance of plant clearance duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government-furnished property from inventory schedules; (v) Evaluate physical, quantitative, and technical allocability of contractor inventory prior to disposal using Standard Form 1423, Inventory Verification Survey...

  11. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Does not obtain an unfair competitive advantage over other parties by virtue of its performance of this... technical bias or unfair competitive advantage. (d) Disclosure after award. (1) The contractor warrants that...

  12. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  13. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  14. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  15. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  16. Engineering the System and Technical Integration

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.

    2011-01-01

    Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.

  17. HNSciCloud - Overview and technical Challenges

    NASA Astrophysics Data System (ADS)

    Gasthuber, Martin; Meinhard, Helge; Jones, Robert

    2017-10-01

    HEP is only one of many sciences with sharply increasing compute requirements that cannot be met by profiting from Moore’s law alone. Commercial clouds potentially allow for realising larger economies of scale. While some small-scale experience requiring dedicated effort has been collected, public cloud resources have not been integrated yet with the standard workflows of science organisations in their private data centres; in addition, European science has not ramped up to significant scale yet. The HELIX NEBULA Science Cloud project - HNSciCloud, partly funded by the European Commission, addresses these points. Ten organisations under CERN’s leadership, covering particle physics, bioinformatics, photon science and other sciences, have joined to procure public cloud resources as well as dedicated development efforts towards this integration. The HNSciCloud project faces the challenge to accelerate developments performed by the selected commercial providers. In order to guarantee cost efficient usage of IaaS resources across a wide range of scientific communities, the technical requirements had to be carefully constructed. With respect to current IaaS offerings, dataintensive science is the biggest challenge; other points that need to be addressed concern identity federations, network connectivity and how to match business practices of large IaaS providers with those of public research organisations. In the first section, this paper will give an overview of the project and explain the findings so far. The last section will explain the key points of the technical requirements and present first results of the experience of the procurers with the services in comparison to their’on-premise’ infrastructure.

  18. 48 CFR 1052.201-70 - Contracting Officer's Technical Representative (COTR) Designation and Authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in writing. The term “technical direction” includes, without limitation, direction to the contractor... the actions of the contractor's employees. (d) Technical direction may be oral or in writing. The COTR... Technical Representative (COTR) Designation and Authority. 1052.201-70 Section 1052.201-70 Federal...

  19. 48 CFR 252.204-7015 - Disclosure of Information to Litigation Support Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Information to Litigation Support Contractors (FEB 2014) (a) Definitions. As used in this clause: Litigation..., financial, proprietary, or privileged nature. The term includes technical data and computer software, but...

  20. 10 CFR 436.33 - Procedures and methods for contractor selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for contractor selection. (a) Competitive selection. Competitive selections based on solicitation of... synopsizes the proposed contract action. (2) Each competitive solicitation— (i) Shall request technical and... from those within the competitive range. (b) Unsolicited proposals. Federal agencies may— (1) Consider...

  1. Needs of Non-Energy Focused Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liakus, C.

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  2. Needs of Non Energy-Focused Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  3. NASA/contractor partnership on the second TDRSS ground terminal program: Breaking barriers

    NASA Technical Reports Server (NTRS)

    Tierney, Paul G.

    1992-01-01

    The Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT) Program from its technical and programmatic backgrounds is introduced and then several techniques to enhance communication and empower the NASA Contractor team are described. A major factor in our success was an approach used to shorten the time span of the Critical Design Review phase. This approach is described. The relationships involving NASA's O&M contractor are discussed. A set of lessons learned is included.

  4. Cross-national research on contractor evaluation procedures in public works procurement

    NASA Astrophysics Data System (ADS)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  5. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  6. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  7. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  8. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  9. NASA Langley Scientific and Technical Information Output-2001

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2002-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the 2001 calendar year. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  10. NASA Langley Scientific and Technical Information Output-2002

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2003-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2002. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  11. NASA Langley Scientific and Technical Information Output: 1998

    NASA Technical Reports Server (NTRS)

    Machie, Harriet B. (Compiler); Stewart, Susan H. (Compiler)

    1999-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1998. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  12. NASA Langley Scientific and Technical Information Output?2003

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2004-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2003. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  13. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract. (d) All technical direction shall be issued in writing by the COR. (e) The Contractor must... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  14. 48 CFR 1852.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Direction (SEP 1993) (a) Performance of the work under this contract is subject to the written technical... the Contracting Officer in writing in accordance with NASA FAR Supplement 1842.270. “Technical... in writing by the COTR. (d) The Contractor shall proceed promptly with the performance of technical...

  15. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...

  16. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...

  17. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  18. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  19. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  20. NASA Langley Scientific and Technical Information Output 2000

    NASA Technical Reports Server (NTRS)

    Machie, Harriet B. (Compiler); Stewart, Susan H. (Compiler)

    2001-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2000. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandum, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

  1. NASA Langley Scientific and Technical Information Output: 1999

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Machie, Harriet (Compiler)

    2000-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1999. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

  2. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  3. 78 FR 70569 - Technical Mapping Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID: FEMA-2013-0039] Technical Mapping Advisory Council AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice... Technical Mapping Advisory Council (TMAC). The notice incorrectly stated that contractors and potential...

  4. 20 CFR 401.90 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Contractors. 401.90 Section 401.90 Employees... Privacy Act § 401.90 Contractors. (a) All contracts which require a contractor to maintain, or on behalf... requiring the contractor to comply with the Privacy Act and this part. (b) A contractor and any employee of...

  5. 78 FR 33994 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 252 RIN Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to Technical Data (DFARS 2009-D031); Correction AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD...

  6. Naval Training Device Center Index of Technical Reports.

    ERIC Educational Resources Information Center

    Walker, Lemuel E.

    Published Naval Training Device Center technical reports and some technical notes (those available through the Defense Documentation Center-DDC) which have resulted from basic research, exploratory development, and advanced development type projects are listed. The reports are indexed by technical note number, by title, and by contractor code. The…

  7. NASA Langley Scientific and Technical Information Output: 1997

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Machie, Harriet B. (Compiler)

    1998-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1997. Included are citations for Formal Reports, Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  8. FY 1984 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, J. E. (Compiler)

    1984-01-01

    This bibliography lists formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel. Abstracts are presented for 56 technical memorandum, and 13 technical papers. Six publications, over 260 contractor reports, and more than 300 papers cleared for publication are cited.

  9. FY 1980 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1980-01-01

    Abstracts are presented for 60 technical memoranda and 5 technical papers published in technical journals or presented by MSFC personnel in FY 1980. Conference and reference publications are cited along with contractor reports and papers cleared for presentation.

  10. Fiscal year 1979 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1979-01-01

    This bibliography lists approximately 590 formal NASA technical reports, papers published in technical journals, presentations by MSFC personnel, and reports of MSFC contractors introduced into the NASA scientific and technical information system in 1979.

  11. Defense Primer: DOD Contractors

    DTIC Science & Technology

    2017-02-10

    contractors . A defense contractor , as defined by the Code of Federal Regulations, is “any individual, firm, corporation, partnership, association...158.3, “Definitions”). Within the defense policy community, the term contractor is commonly used in two different contexts. The word can describe

  12. 40 CFR 35.4215 - What if my group can't find an adequate number of potential sources for a technical advisor or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... number of potential sources for a technical advisor or other contractor? 35.4215 Section 35.4215... ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4215 What if my group can't find an adequate number of potential sources for a technical advisor...

  13. FY 1986 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1986-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY-86 are presented. Also included are papers of MSFC contractors.

  14. 22 CFR 136.6 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contractors. 136.6 Section 136.6 Foreign... Contractors. To the extent that contractors enjoy importation or tax privileges in a foreign country because... provisions in their contracts that require the contractors to observe the requirements of these regulations...

  15. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...

  16. NASA Langley Scientific and Technical Information Output: 1996

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Phillips, Marilou S. (Compiler)

    1997-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1996. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  17. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Contractors' bonds. 1788.12 Section 1788.12... Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  18. Scientific and technical information output of the Langley Research Center

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Scientific and technical information that the Langley Research Center produced during the calendar year 1983 is compiled. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  19. Scientific and Technical Information Output of the Langley Research Center, for calendar year 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Documents listed include NASA Technical Reports, Technical Notes, Technical Memorandums, Special Publications, Contractor Reports, journal articles, and technical presentations made at Society meetings. NASA formal reports listed are those that were mailed and distributed to the ultimate user. The material presented here is listed first by Division and then under the following headings: (a) Formal Reports, (b) Contractor Reports, (c) Articles and Meeting Presentations, and (d) High Number Technical Memorandums (High TMX's). Under each heading, the material cited authors in alphabetical order. If a report has more than one author and these authors are from different Divisions, the report is listed only once, under the senior author's name.

  20. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  1. Fiscal year 1981 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Thacker, S. S. (Compiler)

    1981-01-01

    This bibliography lists approximately 503 formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY-1981. It also includes papers of MSFC contractors. Citations announced in the NASA scientific and technical information system are noted.

  2. Fingerprinting of Materials: Technical Supplement

    NASA Technical Reports Server (NTRS)

    Workman, Gary L.

    1992-01-01

    This supplement to the Guidelines for Maintaining a Chemical Fingerprinting Program has been developed to assist NASA personnel, contractors, and sub-contractors in defining the technical aspects and basic concepts which can be used in chemical fingerprinting programs. This material is not meant to be totally inclusive to all chemical fingerprinting programs, but merely to present current concepts. Each program will be tailored to meet the needs of the individual organizations using chemical fingerprinting to improve their quality and reliability in the production of aerospace systems.

  3. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  4. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  5. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  6. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  7. 7 CFR 1788.12 - Contractors' bonds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE (CONTINUED) RUS FIDELITY AND INSURANCE REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.12 Contractors' bonds. Electric borrowers shall require contractors to obtain contractors' bonds when required by part 1726...

  8. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...

  9. 76 FR 39015 - Contractor Performance Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  10. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  11. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  12. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Contractors. 68.87 Section 68.87... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This section applies to contractors performing maintenance or repair, turnaround, major renovation, or...

  13. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  14. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  15. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  16. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  17. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  18. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Government contractors. 10.27 Section 10.27... INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract..., Criminal Penalties, any such contractor and any employee of the contractor are considered, in accordance...

  19. 49 CFR 199.245 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  20. 38 CFR 46.8 - Independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Independent contractors... contractors. Independent contractors acting on behalf of the Department of Veterans Affairs are subject to the... provide the contractor with notice that a report of a clinical privileges action will be filed with the...

  1. 49 CFR 199.115 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  2. 7 CFR 1726.27 - Contractor's bonds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  3. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  4. DFAS Needs More Effective Controls Over Managing DoD Contractor Debt

    DTIC Science & Technology

    2011-07-15

    Acrobat fil e onl y) to audc lev@dod ig.m il. Copies of management comments must have the actual signature of the authori zing official for yo ur...Attribute Testing Results 18 E. Sampling Methodology 20 Glossary of Technical Terms 21 Management...Bill of Collection number to each contractor debt as a debt management tool. CDS allows users to prepare a demand letter from the database, post

  5. 48 CFR 18.102 - Central contractor registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  6. FY 2002 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2003-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2002. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  7. NASA Langley Scientific and Technical Information Output, 1995. Volume 1

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Phillips, Marilou S. (Compiler)

    1996-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1995. Included are citations for formal reports, high-numbered conference publications, high-numbered technical memorandums, contractor reports, journal articles and other publications, meeting presentations, technical talks, computer programs, tech briefs, and patents.

  8. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Government contractors. 83.19 Section 83.19 Accounts... contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel... of this part to be applied to such system. Any such contractor and any employee of such contractor...

  9. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  10. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  11. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  12. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  13. 32 CFR 1701.16 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractors. 1701.16 Section 1701.16 National... Under the Privacy Act of 1974 § 1701.16 Contractors. (a) Any approved contract for the operation of a... prescribed by the Federal Acquisition Regulations (FAR) at 48 CFR part 24, requiring the contractor to comply...

  14. FY 2005 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Narmore, K. A. (Compiler)

    2007-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2005. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  15. FY 1985 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1985-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by Marshal Space Flight Center (MSFC) personnel in FY 85. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service (NTIS), 5285 Port Royal Road, Springfield, Va. 22161.

  16. Commercial Building Energy Asset Score Program Overview and Technical Protocol (Version 1.1)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Na; Goel, Supriya; Makhmalbaf, Atefe

    The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system, known as the Commercial Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in amore » way that is independent from operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset scoring tool. The alternative methods that were considered prior to developing the current approach are described in the Program Overview and Technical Protocol Version 1.0.« less

  17. 48 CFR 1845.502 - Contractor responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  18. Fundamental Aeronautics Program: Overview of Propulsion Work in the Supersonic Cruise Efficiency Technical Challenge

    NASA Technical Reports Server (NTRS)

    Castner, Ray

    2012-01-01

    The Supersonics Project, part of NASA's Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2012) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  19. 48 CFR 3009.171-8 - Ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...

  20. Energy, Power and Thermal Research Overview

    DTIC Science & Technology

    2010-09-01

    Research Overview Rick Fingers, Ph.D. Chief Energy/Power/Thermal Division Propulsion Directorate Air Force Research ... Air Vehicles Sensors AFOSR 5 AFRL People & Facilities • 10 Major R&D Sites across US • 40 Sites World-Wide • $40B Real Property & Capital throughout... AFRL • 5,764 Government Employees – 4570 Air Force Civilian – 1194 Military • 3,844 Onsite Contractors 6 Propulsion Directorate’s Strategic

  1. 48 CFR 1602.170-4 - Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  2. 48 CFR 1609.471 - Contractor certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  3. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  4. FY 1989 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1989-01-01

    A compendium of bibliographic references to papers presented by Marshall Space Flight Center (MSFC) personnel and contractors during FY 1989 is provided. The papers include formal NASA technical reports, memoranda, papers which were published in technical journals, and presentations by MSFC personnel. The formal NASA technical reports and memoranda have abstracts included. Sources for obtaining these documents are also included.

  5. 48 CFR 852.237-70 - Contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  6. 30 CFR 45.4 - Independent contractor register.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  7. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  8. 48 CFR 52.241-5 - Contractor's Facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  9. 14 CFR 1245.108 - License to contractor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  10. 48 CFR 52.247-28 - Contractor's Invoices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  11. 48 CFR 33.207 - Contractor certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  12. 48 CFR 725.703 - Contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  13. 40 CFR 35.4190 - How does my group identify a qualified technical advisor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... technical advisor? 35.4190 Section 35.4190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4190 How does my group identify a qualified...

  14. 48 CFR 1845.502-70 - Contractor-acquired property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  15. 48 CFR 1252.242-71 - Contractor testimony.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  16. 24 CFR 242.53 - Excluded contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Excluded contractors. 242.53... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.53 Excluded contractors. (a) Contracts relating to the... participation in federal programs, including but not limited to: A general contractor, a subcontractor, or...

  17. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  18. The Next-Generation Very Large Array: Technical Overview

    NASA Astrophysics Data System (ADS)

    McKinnon, Mark; Selina, Rob

    2018-01-01

    As part of its mandate as a national observatory, the NRAO is looking toward the long range future of radio astronomy and fostering the long term growth of the US astronomical community. NRAO has sponsored a series of science and technical community meetings to consider the science mission and design of a next-generation Very Large Array (ngVLA), building on the legacies of the Atacama Large Millimeter/submillimeter Array (ALMA) and the Very Large Array (VLA).The basic ngVLA design emerging from these discussions is an interferometric array with approximately ten times the sensitivity and ten times higher spatial resolution than the VLA and ALMA radio telescopes, optimized for operation in the wavelength range 0.3cm to 3cm. The ngVLA would open a new window on the Universe through ultra-sensitive imaging of thermal line and continuum emission down to milli-arcsecond resolution, as well as unprecedented broadband continuum polarimetric imaging of non-thermal processes. The specifications and concepts for major ngVLA system elements are rapidly converging.We will provide an overview of the current system design of the ngVLA. The concepts for major system elements such as the antenna, receiving electronics, and central signal processing will be presented. We will also describe the major development activities that are presently underway to advance the design.

  19. Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    2001-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2000. It also includes papers of MSFC contractors. After being announced in STAR, all the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  20. Unlocking energy efficiency in small commercial buildings through mechanical contractors

    DOE PAGES

    Granderson, Jessica; Hult, Erin; Fernandes, Samuel; ...

    2017-03-01

    Although buildings smaller than 4,645 m 2 account for nearly half of the energy used in U.S. commercial buildings, energy-efficiency programs to date have primarily focused on larger buildings. Stakeholder interviews conducted during a scoping study by Lawrence Berkeley National Laboratory (LBNL) indicated interest in energy efficiency from the small commercial building sector, provided solutions are simple and of low cost. To address this need, an energy management package (EMP) was developed to deliver energy management to small commercial buildings via HVAC contractors, because they already serve these clients and the transaction cost to market would be reduced. This energy-managementmore » approach is unique from, but often complementary to, conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Furthermore, this paper presents an overview of the EMP, the business model to deliver it, and preliminary demonstration findings from a pilot use of the EMP. Results from the pilot validated that contractors could deliver the EMP in 4–8 h per building per year and that energy savings of 3–5% are feasible through this approach.« less

  1. Unlocking energy efficiency in small commercial buildings through mechanical contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Granderson, Jessica; Hult, Erin; Fernandes, Samuel

    Although buildings smaller than 4,645 m 2 account for nearly half of the energy used in U.S. commercial buildings, energy-efficiency programs to date have primarily focused on larger buildings. Stakeholder interviews conducted during a scoping study by Lawrence Berkeley National Laboratory (LBNL) indicated interest in energy efficiency from the small commercial building sector, provided solutions are simple and of low cost. To address this need, an energy management package (EMP) was developed to deliver energy management to small commercial buildings via HVAC contractors, because they already serve these clients and the transaction cost to market would be reduced. This energy-managementmore » approach is unique from, but often complementary to, conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Furthermore, this paper presents an overview of the EMP, the business model to deliver it, and preliminary demonstration findings from a pilot use of the EMP. Results from the pilot validated that contractors could deliver the EMP in 4–8 h per building per year and that energy savings of 3–5% are feasible through this approach.« less

  2. 40 CFR 35.6600 - Contractor claims.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  3. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document and to DOE Order 1300.2A. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information bymore » the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this TSL are those recorded as of July 1, 1996.« less

  4. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  5. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  6. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  7. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  8. 32 CFR 310.12 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Government contractors. 310.12 Section 310.12... PROGRAM DOD PRIVACY PROGRAM Systems of Records § 310.12 Government contractors. (a) Applicability to government contractors. (1) When a DoD Component contract requires the operation or maintenance of a system...

  9. 28 CFR 513.36 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Government contractors. 513.36 Section... contractors. (a) No Bureau component may contract for the operation of a record system by or on behalf of the... component shall have the responsibility to ensure that the contractor complies with the contract...

  10. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  11. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  12. Scientific and technical information output of the Langley Research Center for calendar year 1984

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The scientific and technical information that the Langley Research Center produced during the calendar year 1984 is compiled. Approximately 1650 citations are included comprising formal reports, quick-release technical memorandums, contractor reports, journal articles and other publications, meeting presentations, technical talks, computer programs, tech briefs, and patents.

  13. 45 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Contractors. 5b.12 Section 5b.12 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to maintain...

  14. FY 1991 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1991-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 1991 are presented. Papers of MSFC contractors are also included. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  15. NASA Langley scientific and technical information output: 1994, volume 1

    NASA Technical Reports Server (NTRS)

    Phillips, Marilou S. (Compiler); Stewart, Susan H. (Compiler)

    1995-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1994. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Computer Programs, Tech Briefs, and Patents.

  16. NASA Langley Scientific and Technical Information Output: 1994. Volume 1

    NASA Technical Reports Server (NTRS)

    Phillips, Marilou S. (Compiler); Stewart, Susan H. (Compiler)

    1995-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1994. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Computer Programs, Tech Briefs, and Patents.

  17. Management and operating contractors' pension plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1987-06-01

    This report concerns the management of 28 M and O contractor pension plans with assets exceeding $2.6 billion in 1983. At the end of 1983, these pension plans were overfunded by $600 million. The Department could have saved $94 million in 1983 had the contractors been required to limit their pension plan contributions to the Government-established minimum level. Since 1979, the Department has continually reimbursed these contractors for contributions to pension plans that were already overfunded and we estimate that these plans are currently overfunded in excess of $1 billion. Additional annual savings of about $548,000 could be realized ifmore » the Department obtained waivers for M and O contractors participating in the Pension Benefit Guaranty Corporation's (PBGC) insurance program. Management and Administration, which has overall responsibility for controlling such costs, indicated it did not agree that contractors should fund pension plans at only the minimum required level. General agreement was indicated with the need to obtain waivers from PBGC premiums and better protect the Department's interest in contractor excess pension assets.« less

  18. 48 CFR 970.4402 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  19. 34 CFR 5b.12 - Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Contractors. 5b.12 Section 5b.12 Education Office of the Secretary, Department of Education PRIVACY ACT REGULATIONS § 5b.12 Contractors. (a) All contracts entered into on or after September 27, 1975 which require a contractor to maintain or on behalf of the...

  20. Scientific and technical information output of the Langley Research Center for Calendar Year 1985

    NASA Technical Reports Server (NTRS)

    1986-01-01

    A compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1985 is presented. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  1. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  2. 48 CFR 51.104 - Furnishing assistance to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 51.104 Section 51.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 51.104 Furnishing assistance to contractors. After receiving an activity address code, the contracting...

  3. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  4. FY 2001 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    2002-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2001. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  5. FY 2004 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2006-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel FY 2004. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this TM maybe of value to the scientific and engineering community in determining what information has been published and what is available.

  6. 30 CFR 45.3 - Identification of independent contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Identification of independent contractors. 45.3... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.3 Identification of independent contractors. (a) Any independent contractor may obtain a permanent MSHA identification number. To obtain an identification number...

  7. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  8. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  9. Scientific and technical information output of the Langley Research Center for calendar year 1982

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Citations are presented for 1380 for formal reports; quick-release technical memorandum; contractor reports; journal articles and periodical literature; technical talks and meeting presentations; computer programs; tech briefs, and patents produced during 1982. An author index is provided.

  10. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical... Organizations 2131.205-43 Trade, business, technical and professional activity costs. (a) FEGLI Program contractors shall seek the advance written approval of the contracting officer for allowability of all or part...

  11. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  12. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business system... Business Systems 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  13. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  14. 48 CFR 242.7000 - Contractor business system deficiencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business system... BUSINESS SYSTEMS 242.7000 Contractor business system deficiencies. (a) Definitions. As used in this subpart— Acceptable contractor business systems and contractor business systems are defined in the clause at 252.242...

  15. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  16. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  17. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  18. 48 CFR 42.402 - Visits to contractors' facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors... contractors' facilities. (a) Government personnel planning to visit a contractor's facility in connection with... positions, and security clearances. (2) Date and duration of visit. (3) Name and address of contractor and...

  19. FY 1994 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1994-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center personnel in FY94. It also includes papers of MSFC contractors and author indexes. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  20. 41 CFR 109-38.301-1 - Contractors' use.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Contractors' use. 109-38...-38.301-1 Contractors' use. Heads of field organizations shall ensure that provisions of the FPMR concerning contractor use of Government motor vehicles are complied with by their designated contractors. ...

  1. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  2. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  3. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  4. 48 CFR 47.207-5 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be shipped and services required. The contracting officer shall specify clearly those service requirements... freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for...

  5. 48 CFR 450.303-1 - Contractor requests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  6. 78 FR 11164 - Policy on Contractor Profits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  7. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  8. 48 CFR 46.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  9. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... 923.102 Applicability to contractors. Many of the Department's major facilities are operated by contractors. Provisions regarding those contracts may be found at Part 970 of this chapter. At other locations...

  10. 48 CFR 2427.305-2 - Follow-up by contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  11. FY 2003 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2004-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2003. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Spring.eld, VA 22161. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  12. 14 CFR 1245.108 - License to contractor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true License to contractor. 1245.108 Section 1245.108 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PATENTS AND OTHER INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor reporting...

  13. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  14. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  15. 32 CFR 989.23 - Contractor prepared documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  16. 6 CFR 25.8 - Government contractor Defense.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  17. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  18. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  19. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  20. 40 CFR 68.87 - Contractors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... known potential fire, explosion, or toxic release hazards related to the contractor's work and the... instructed in the known potential fire, explosion, or toxic release hazards related to his/her job and the...

  1. OSH technical reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less

  2. 42 CFR 455.202 - Limitation on contractor liability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  3. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  4. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Qualified contractors lists. 436.32 Section 436.32 Energy... Procedures for Energy Savings Performance Contracting § 436.32 Qualified contractors lists. (a) DOE shall... energy savings performance contracts. (c) DOE may remove a firm from DOE's list of qualified contractors...

  5. 21 CFR 21.30 - Records of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Records of contractors. 21.30 Section 21.30 Food... PRIVACY Requirements for Specific Categories of Records § 21.30 Records of contractors. (a) Systems of... contractors to accomplish Food and Drug Administration functions, from which information is retrieved by...

  6. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Disclosure to contractors. 20.90 Section 20.90... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise exempt from public disclosure may be disclosed to contractors with the Food and Drug Administration and...

  7. 18 CFR 3b.4 - Government contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... PERSONAL INFORMATION General § 3b.4 Government contractors. Systems of records operated by a contractor...

  8. FY 1998 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    1999-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC (Marshall Space Flight Center) personnel in FY98. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  9. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  10. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that... event the notice is inadequate to make a decision, advise the Contractor what additional information is...

  11. General practitioners and the independent contractor status

    PubMed Central

    Gray, D. J. Pereira

    1977-01-01

    Primary medical care can be provided either by a bureaucratic hierarchical organization or alternatively by independent contractors. Most members of the caring professions in medicine, nursing, and social work are employed in bureaucracies, whereas general medical practitioners, general dental practitioners, opticians, and pharmacists are independent contractors. The independent contractor status has recently been heavily attacked from within the medical and nursing professions, and also from outside. It has been suggested that contracting for services is an inappropriate and anomalous way of arranging medical care, which should now be stopped. However, this process of contracting for services can be analysed, using perspectives from some of the behavioural sciences, to reveal hidden depths in the independent contractor status which suggest that the provision of primary medical care is best carried out by independent contractors. PMID:616865

  12. An Overview of Clarkson's Technical Communications Program.

    ERIC Educational Resources Information Center

    Barkman, Patricia R.

    The technical communications program at Clarkson College (New York) offers students 23 courses in subjects ranging from interpersonal behavior to engineering and scientific report writing to computer documentation and the development of technical manuals. With the help of an advisor, each student works out a course of study appropriate to his or…

  13. FY 1995 Scientific and Technical Reports, Articles, Papers, and Presentations, Volume 1

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1995-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY95. It also includes papers of MSFC contractors. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  14. 41 CFR 60-741.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-741.68 Section 60-741.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... Reinstatement of ineligible contractors. (a) Application for reinstatement. A contractor debarred from further...

  15. 41 CFR 60-300.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-300.68 Section 60-300.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  16. 41 CFR 60-250.68 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-250.68 Section 60-250.68 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND... ineligible contractors. (a) Application for reinstatement. A contractor debarred from further contracts for...

  17. 41 CFR 60-1.31 - Reinstatement of ineligible contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ineligible contractors. 60-1.31 Section 60-1.31 Public Contracts and Property Management Other Provisions..., DEPARTMENT OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS General Enforcement; Compliance Review and Complaint Procedure § 60-1.31 Reinstatement of ineligible contractors. A contractor debarred from...

  18. FY 1988 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1988-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 88. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the NationaL Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  19. FY87 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1987-01-01

    The document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY87. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, Va. 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  20. FY 1990 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1990-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 90 are presented. Also included are papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from NTIS. The information may be of value to the scientific and engineering community in determining what information has been published and what is available.

  1. Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Turner, J. E. (Compiler)

    2000-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  2. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  3. 48 CFR 245.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  4. 48 CFR 1553.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  5. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., contractors). 548.14 Section 548.14 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with... require a recognized representative of the faith group to verify a volunteer's or contractor's religious...

  6. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  7. 48 CFR 1852.209-72 - Composition of the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  8. 40 CFR 35.938-6 - Progress payments to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Progress payments to contractors. 35... § 35.938-6 Progress payments to contractors. (a) Policy. EPA policy is that, except as State law otherwise provides, grantees should make prompt progress payments to prime contractors and prime contractors...

  9. 48 CFR 53.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  10. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  11. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  12. 48 CFR 2936.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  13. 48 CFR 32.909 - Contractor inquiries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  14. Technical paper contest for women 1992. Space challenges: Earth and beyond

    NASA Technical Reports Server (NTRS)

    Orans, Robin (Editor)

    1993-01-01

    Two of the major concerns of the NASA Ames Research Center (NASA ARC) Advisory Committee for Women (ACW) are that recruitment of women scientists, engineers, and technicians needs to increase and that barriers to advancement need to be removed for improved representation of women in middle and upper management and scientific positions. One strategy that addressed this concern was the ACW sponsorship of a Technical Paper Contest for Women at Ames Research Center. Other sponsors of the Contest were the Ames Equal Opportunity Council and the Ames Contractor Council. The Technical Paper Contest for Women greatly increased the visibility of both the civil service women and the women who work for contractors at Ames. The women had the opportunity to hone their written and oral presentation skills. Networking among Ames women increased.

  15. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970... management system. The Contractor's approved purchasing system and methods shall include the requirements set... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contractor purchasing...

  16. 48 CFR 2152.215-70 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  17. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ... [CMS-6034-P] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY: Centers for Medicare... Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State payments to Medicaid RACs... RACs coordinate with other contractors and entities auditing Medicaid providers and with State and...

  18. 48 CFR 3036.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  19. 48 CFR 36.506 - Superintendence by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  20. 48 CFR 2452.251-70 - Contractor employee travel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  1. 76 FR 57807 - Medicaid Program; Recovery Audit Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... for Medicare & Medicaid Services 42 CFR Part 455 Medicaid Program; Recovery Audit Contractors; Final... 42 CFR Part 455 [CMS-6034-F] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY... costs of Medicaid Recovery Audit Contractors (Medicaid RACs) and the payment methodology for State...

  2. 48 CFR 1652.204-70 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  3. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  4. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  5. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  6. 48 CFR 46.105 - Contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is responsible for carrying out its obligations under the contract by— (1) Controlling the quality of supplies or..., subassemblies, etc., have an acceptable quality control system; and (4) Maintaining substantiating evidence...

  7. 48 CFR 4.102 - Contractor's signature.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  8. 48 CFR 253.209 - Contractor qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  9. Contractor and government - Teamwork and commitment

    NASA Technical Reports Server (NTRS)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  10. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  11. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  12. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  13. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: CONTRACTOR BUSINESS SYSTEMS (MAY 2011) (a) Definitions. As used in this clause...

  14. 48 CFR 252.242-7005 - Contractor business systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contractor business... of Provisions And Clauses 252.242-7005 Contractor business systems. As prescribed in 242.7001, use the following clause: Contractor Business Systems (FEB 2012) (a) This clause only applies to covered...

  15. 48 CFR 53.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractors. 53.209-1 Section 53.209-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209-1 Responsible prospective contractors. (a) SF 1403 (Rev. 9/88), Preaward Survey of Prospective Contractor (General). SF 1403 is authorized for...

  16. Bibliography of Lewis Research Center technical contributions announced in 1976

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Abstracts of Lewis authored publications and publications resulting from Lewis managed contracts which were announced in the 1976 issues of STAR (Scientific and Technical Aerospace Reports) and IAA (International Aerospace Abstracts) are presented. Research reports, journal articles, conference presentations, patents and patent applications, and these are included. The arrangement is by NASA subject category. Citations indicate report literature (identified by their N-numbers) and the journal and conference presentations (identified by their A-numbers). A grouping of indexes helps locate specific publications by author (including contractor authors), contractor organization, contract number, and report number.

  17. 30 CFR 874.16 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  18. 30 CFR 875.20 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  19. Contractor Motivation Theory and Applications.

    DTIC Science & Technology

    1981-03-01

    Project Officer, Chief, Test and Evaluation Group , US Army Procurement Research Office, ALMC. BS, Aeronautical Engineering, University of Wyoming, 1963...Contractor Motivation Theory and Applications SEE DISTRIBUTION Inclosed is a copy of subject report for your use . This report describes the DOD contractor...motivation process and various areas for improvement. In particular, it identifies effective incentives that can be used and recommends policy that

  20. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 3 2013-04-01 2013-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  1. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 3 2014-04-01 2014-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  2. 20 CFR 655.19 - Job contractor filing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Job contractor filing requirements. 655.19... States (H-2B Workers) Application for Temporary Employment Certification Filing Procedures § 655.19 Job contractor filing requirements. (a) Provided that a job contractor and any employer-client are joint...

  3. 32 CFR 516.21 - Litigation against government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 3 2012-07-01 2009-07-01 true Litigation against government contractors. 516.21... government contractors. (a) General. A contract might require that the government reimburse a contractor (or... with the government requires reimbursement for adverse judgments or costs of the litigation, the SJA or...

  4. 7 CFR 3015.183 - Access to contractor records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  5. 4 CFR 75.1 - Contractors' and vendors' certificates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Contractors' and vendors' certificates. 75.1 Section 75.1... BASIC VOUCHERS AND INVOICES § 75.1 Contractors' and vendors' certificates. (a) The Government... bills and invoices of contractors and vendors, with the exception that carriers, or other corporations...

  6. Scientific and technical information output of the Langley Research Center for calendar year 1980

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1980. Approximately 1400 citations are given. Formal reports, quick-release technical memorandums, contractor reports, journal articles, meeting/conference papers, computer programs, tech briefs, patents, and unpublished research are included.

  7. Scientific and technical information output of the Langley Research Center for calendar year 1986

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1986. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Techncial Talks, Computer Programs, Tech Briefs, and Patents.

  8. The FY 1992 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1992-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY92. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  9. Fiscal year 1993 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1993-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY93. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  10. 48 CFR 3052.204-71 - Contractor employee access.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  11. 78 FR 51658 - Weighing, Feed, and Swine Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... RIN 0580-AA99 Weighing, Feed, and Swine Contractors AGENCY: Grain Inspection, Packers and Stockyards... and swine contractors to poultry and swine production contract growers are based on accurate weighing... reweighing to add swine contractors to the list of firms that must comply, and adding feed to the list of...

  12. Contractor Accounting, Reporting and Estimating (CARE).

    DTIC Science & Technology

    Contractor Accounting Reporting and Estimating (CARE) provides check lists that may be used as guides in evaluating the accounting system, financial reporting , and cost estimating capabilities of the contractor. Experience gained from the Management Review Technique was used as a basis for the check lists. (Author)

  13. 48 CFR 945.610-4 - Contractor inventory in foreign countries.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor inventory in... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 945.610-4 Contractor inventory in foreign countries. Contractor inventory located in foreign countries...

  14. 41 CFR 109-43.302-50 - Utilization by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated contractors. 109-43.302-50 Section 109-43.302-50 Public Contracts and Property Management Federal... Utilization by designated contractors. Heads of field organizations may authorize designated contractors to... Federal agency, provided the designated contractors have written policies and procedures. ...

  15. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  16. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  17. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  18. 49 CFR 10.27 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Government contractors. 10.27 Section 10.27 Transportation Office of the Secretary of Transportation MAINTENANCE OF AND ACCESS TO RECORDS PERTAINING TO INDIVIDUALS Maintenance of Records § 10.27 Government contractors. When the Department provides by a contract...

  19. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) under a contract, the primary purpose of which is to furnish independent and impartial advice or... Government-Furnished Information Marked with Restrictive Legends. (3) Form, fit, and function data means..., fit, and function data; (iii) Are a correction or change to technical data furnished to the Contractor...

  20. An Overview of the Performance of the Chandra X-ray Observatory

    NASA Technical Reports Server (NTRS)

    Weisskopf, M. C.; Aldcroft, T. L.; Bautz, M.; Cameron, R. A.; Dewey, D.; Drake, J. J.; Grant, C. E.; Marshall, H. L.; Murray, S. S.

    2004-01-01

    The Chandra X-ray Observatory is the X-ray component of NASA's Great Observatory Program which includes the recently launched Spitzer Infrared Telescope, the Hubble Space Telescope (HST) for observations in the visible, and the Compton Gamma-Ray Observatory (CGRO) which, after providing years of useful data has reentered the atmosphere. All these facilities provide, or provided, scientific data to the international astronomical community in response to peer-reviewed proposals for their use. The Chandra X-ray Observatory was the result of the efforts of many academic, commercial, and government organizations primarily in the United States but also in Europe. NASA s Marshall Space Flight Center (MSFC) manages the Project and provides Project Science; Northrop Grumman Space Technology (NGST - formerly TRW) served as prime contractor responsible for providing the spacecraft, the telescope, and assembling and testing the Observatory; and the Smithsonian Astrophysical Observatory (SAO) provides technical support and is responsible for ground operations including the Chandra X-ray Center (CXC). Telescope and instrument teams at SAO, the Massachusetts Institute of Technology (MIT), the Pennsylvania State University (PSU), the Space Research Institute of the Netherlands (SRON), the Max-Planck Institut fur extraterrestrische Physik (MPE), and the University of Kiel support also provide technical support to the Chandra Project. We present here a detailed description of the hardware, its on-orbit performance, and a brief overview of some of the remarkable discoveries that illustrate that performance.

  1. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  2. Debarment and suspension. [of contractors

    NASA Technical Reports Server (NTRS)

    Whelan, Thomas J.

    1987-01-01

    The changing Government attitude toward contractor debarment and suspension is examined, with emphasis on the fact that the Government is more alert to fraud, waste, and abuse. Consideration is given to causes of debarment or suspension, procedures and due process hearings, settlement agreements, compliance programs, and recent related legislation. It is concluded that the change in the Government contracting environment in recent years should be sufficient incentive for contractors to monitor their operations more closely.

  3. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  4. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  5. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  6. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contractor financial... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor...

  7. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 4 Accounts 1 2011-01-01 2011-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  8. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 4 Accounts 1 2013-01-01 2013-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  9. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 4 Accounts 1 2012-01-01 2012-01-01 false Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  10. 4 CFR 83.19 - Government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 4 Accounts 1 2014-01-01 2013-01-01 true Government contractors. 83.19 Section 83.19 Accounts GOVERNMENT ACCOUNTABILITY OFFICE RECORDS PRIVACY PROCEDURES FOR PERSONNEL RECORDS § 83.19 Government contractors. When GAO provides by a contract for the operation by or on behalf of GAO of a system of personnel...

  11. Fiscal year 1977 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1977-01-01

    This bibliography lists 78 NASA technical memoranda, notes, papers, and reports presented by Marshall Space Flight Center personnel in FY 1977. In addition, 525 papers by contractors to that facility are cited along with 129 papers cleared for presentation.

  12. The Contractor's Role in Competitive Bid Construction.

    ERIC Educational Resources Information Center

    Toy, G. Arlan

    1986-01-01

    In a competitive bid situation, the general contractor's first priority is controlling construction costs. The actions the general contractor take focus on adequate control, effective communication, efficient use of resources, and prevention of delays. (MLF)

  13. 76 FR 60838 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... of government contractors. As a legislative branch agency, GAO is not subject to the requirements of... (hereinafter, contractors) who are responsible. However, GAO's Procurement Order has not explicitly referenced...

  14. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... OFFICE OF PERSONNEL MANAGEMENT Debarment, Suspension, and Ineligibility of Contractors AGENCY: U.S... Acquisition Regulation (FAR) regarding the debarment, suspension, and ineligibility of government contractors... ensure that it contracts only with those entities and individuals (hereinafter, contractors) who are...

  15. Head Start Impact Study. Technical Report

    ERIC Educational Resources Information Center

    Puma, Michael; Bell, Stephen; Cook, Ronna; Heid, Camilla; Shapiro, Gary; Broene, Pam; Jenkins, Frank; Fletcher, Philip; Quinn, Liz; Friedman, Janet; Ciarico, Janet; Rohacek, Monica; Adams, Gina; Spier, Elizabeth

    2010-01-01

    This Technical Report is designed to provide technical detail to support the analysis and findings presented in the "Head Start Impact Study Final Report" (U.S. Department of Health and Human Services, January 2010). Chapter 1 provides an overview of the Head Start Impact Study and its findings. Chapter 2 provides technical information on the…

  16. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  17. 77 FR 7579 - Debarment, Suspension, and Ineligibility of Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... GOVERNMENT ACCOUNTABILITY OFFICE Debarment, Suspension, and Ineligibility of Contractors AGENCY... government contractors. Comments on GAO's policy were due on or before November 14, 2011. GAO received two... debarment, suspension, and ineligibility of government contractors. Neither comment suggested any changes to...

  18. Private Security Contractors: The Other Force

    DTIC Science & Technology

    2011-03-22

    improving PSC oversight. This paper will not address private contractors conducting Police force training , governmental use of PSCs outside of Iraq...theater entry requirements, conduct mandatory training , conduct weapons training and qualification and conduct security verification and criminal...an effective oversight program including contractor deployment tracking, limited contract oversight personnel, and untrained Contract Officer

  19. [Home hemodialysis: the technical overview. A 2010 survey].

    PubMed

    Ponson, Laurent; Arkouche, Walid; Laville, Maurice

    2012-04-01

    Compared to the daily work in dialysis units, home haemodialysis represents a particular task for the technical services of healthcare facilities. This survey concerns this modality of treatment of end-stage chronic renal failure, and was led to three objectives: to make a snapshot of the practices done by the technical staff, to point out significant differences, and to identify common issues. This is also an opportunity to discuss about the future of this treatment. Numbers of registries show a continuous decline of home haemodialysis during past decades. This could be explained by many factors, but on the other hand several points tend to forecast a renewed interest for this method of treatment. A questionnaire was sent to every technical service of health organizations dispensing dialysis in France. Seventeen health facilities providing home haemodialysis have sent back their information, representing 238 patients, that to say almost the totality of the patients of the country. These data were analysed, relevant indicators were sorted out, so that initial objectives could be completed. The results are explained as follows: site activities, procedures before and during patient installation, equipment, preventive visits, and corrective maintenance. In lack of a precise regulation on the technical support of these patients, significant differences of operations were noted and are detailed, as well as several common difficulties. All these elements can be used as a basis for the development of a practical guide intended to technical services. This work is voluntarily centered on the technical aspects, but other levers exist to revitalize this method. Copyright © 2012 Association Société de néphrologie. Published by Elsevier SAS. All rights reserved.

  20. 41 CFR 109-45.300-50 - Sales by designated contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-45.300-50 Section 109-45.300-50 Public Contracts and Property Management Federal Property... § 109-45.300-50 Sales by designated contractors. Sales of surplus contractor inventory will be conducted by designated contractors when heads of field organizations determine that it is in the best interest...

  1. 48 CFR 2110.7002 - Contractor investment of FEGLI Program funds.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor investment of FEGLI Program funds. (a) The Contractor is required to invest and reinvest all FEGLI... Contractor is required to credit income earned from its investment of FEGLI Program funds to the FEGLI... appropriate manner. If the Contractor fails to invest funds on hand, properly allocate investment income, or...

  2. FY 1996 Scientific and Technical Reports, Articles, Papers, and Presentations. Volume 1

    NASA Technical Reports Server (NTRS)

    Turner-Waits, Joyce E. (Compiler)

    1996-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY96. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  3. 48 CFR 47.305-15 - Loading responsibilities of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Loading responsibilities of contractors. 47.305-15 Section 47.305-15 Federal Acquisition Regulations System FEDERAL... responsibilities of contractors. (a)(1) Contractors are responsible for loading, blocking, and bracing carload...

  4. Ground-based plasma contractor characterization

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Aadland, Randall S.

    1987-01-01

    Presented are recent NASA Lewis Research Center (LeRC) plasma contractor experimental results, as well as a description of the plasma contractor test facility. The operation of a 24 cm diameter plasma source with hollow cathode was investigated in the lighted-mode regime of electron current collection from 0.1 to 7.0 A. These results are compared to those obtained with a 12 cm plasma source. Full two-dimensional plasma potential profiles were constructed from emissive probe traces of the contractor plume. The experimentally measured dimensions of the plume sheaths were then compared to those theoretically predicted using a model of a spherical double sheath. Results are consistent for currents up to approximately 1.0 A. For currents above 1.0 A, substantial deviations from theory occur. These deviations are due to sheath asphericity, and possibly volume ionization in the double-sheath region.

  5. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  6. 41 CFR 109-40.000-50 - Applicability to contractors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contractors. 109-40.000-50 Section 109-40.000-50 Public Contracts and Property Management Federal Property...-50 Applicability to contractors. DOE-PMR 109-40, Transportation and Traffic Management, should be applied to cost-type contractors' transportation and traffic management activities. Departure by cost-type...

  7. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  8. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  9. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  10. 48 CFR 923.102 - Applicability to contractors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contractors. 923.102 Section 923.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition 923.102 Applicability to contractors. Many of the...

  11. 48 CFR 970.0407 - Contractor records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  12. FY 1999 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J.oyce E.Turner

    2000-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  13. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  14. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  15. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  16. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  17. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  18. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  19. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  20. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  1. 75 FR 3977 - Addressing Tax Delinquency by Government Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... Contractors #0; #0; #0; Presidential Documents #0; #0; #0;#0;Federal Register / Vol. 75, No. 15 / Monday... of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of... contractors and has an important obligation to protect American taxpayer money and the integrity of the...

  2. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  3. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  4. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  5. 48 CFR 752.7013 - Contractor-mission relationships.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas... contract, and for advising USAID regarding the performance of the work under the contract and its effect on... of academic freedom. Notwithstanding these academic freedoms, the Contractor's employees, while in...

  6. Measure Guideline. Wall Air Sealing and Insulation Methods in Existing Homes; An Overview of Opportunity and Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, S.; Stephenson, R.

    2012-09-01

    This guide provides renovators and retrofit contractors an overview of considerations when including wall air sealing and insulation in an energy retrofit project. It also outlines the potential project risks, various materials for insulating, possible field inspections needed, installation procedures, as well as the benefits and drawbacks.

  7. Measure Guideline: Wall Air Sealing and Insulation Methods in Existing Homes; An Overview of Opportunity and Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, S.; Stephenson, R.

    2012-09-01

    This guide provides renovators and retrofit contractors an overview of considerations when including wall air sealing and insulation in an energy retrofit project. It also outlines the potential project risks, various materials for insulating, possible field inspections needed, installation procedures, as well as the benefits and drawbacks. The purpose of this document is to provide the outline of the overview and process of insulating and air sealing walls so that home retrofit professionals can identify approaches to air sealing and insulation measures.

  8. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  9. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  10. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  11. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  12. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  13. 7 CFR 1924.276 - Action against contractor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.276 Action... construction defects which are the responsibility of the contractor, debarment proceedings will be initiated... the borrower's claim against the contractor or other party will be obtained if it appears to the...

  14. 48 CFR 1437.7001 - Contractor qualification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  15. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  16. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  17. 28 CFR 115.277 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... volunteers. 115.277 Section 115.277 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... Corrective action for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse... contractor or volunteer. ...

  18. Battlefield Contractors: Operational Risk and System Support Contractors

    DTIC Science & Technology

    2010-10-27

    incentive for the use of contractors is the proven cost savings when compared to similarly trained active duty military forces. The Office of...no military or government civilian is trained to do. The reality is that “modern military operations now depend heavily on high-tech weapons systems...squadrons that rely exclusively on contracted line maintenance, with no military personnel trained to support the aircraft. Defense supplemental funds

  19. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... of such data and information as Food and Drug Administration employees. (b) A written agreement between the Food and Drug Administration and any contractor shall be entered into before data and...

  20. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... of such data and information as Food and Drug Administration employees. (b) A written agreement between the Food and Drug Administration and any contractor shall be entered into before data and...

  1. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  2. 14 CFR 1274.402 - Contractor acquired property.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...

  3. 48 CFR 645.608 - Screening of contractor inventory.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  4. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  5. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  6. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  7. 7 CFR 3015.183 - Access to contractor records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a... applies to the provision: (a) The provision must require the contractor to place the same provision in any...

  8. 48 CFR 1004.470 - Investigative Requirements for Contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Investigative Requirements for Contractors. 1004.470 Section 1004.470 Federal Acquisition Regulations System DEPARTMENT OF THE... Investigative Requirements for Contractors. ...

  9. Contractor cuts solar gain with custom window curtain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ingraham, R.

    1985-04-22

    A local energy services contractor, using a 210-foot motorized thermal curtain to deflect sunlight entering the windows, has reduced excessive heat gain at a racetrack clubhouse here, cutting air conditioning run-time by about 75%. Because Mobile Greyhound Park's clubhouse faces east, direct exposure to sunlight from dawn to afternoon race time, about 1 p.m., was bringing the indoor temperature to almost 100/sup 0/, according to Stan Norris, operations management for the contracting firm, Technical Energy Controls, Inc. Lowering the temperature to a comfortable level required running four Carrier Corporation air handling units, rated at a total of more than 170more » tons, for about eight hours, and annual energy bills were running at about $240,000, Norris said. With the aluminum foil-backed vinyl curtain, the air handling units need only operate two hours to bring temperatures to comfort levels.« less

  10. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... employees; (4) Limitations on reproduction, transmission, and disclosure of the data and information; (5) A... 21 Food and Drugs 1 2012-04-01 2012-04-01 false Disclosure to contractors. 20.90 Section 20.90...

  11. 21 CFR 20.90 - Disclosure to contractors.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... INFORMATION Limitations on Exemptions § 20.90 Disclosure to contractors. (a) Data and information otherwise... employees; (4) Limitations on reproduction, transmission, and disclosure of the data and information; (5) A... 21 Food and Drugs 1 2014-04-01 2014-04-01 false Disclosure to contractors. 20.90 Section 20.90...

  12. Scientific and technical information output of the Langley Research Center for Calender year 1981

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Included are citations for formal reports, quick-release technical memorandums, contractor reports, journal articles and periodical literature, meeting/conference papers, and computer programs. Tech briefs, patents, and oral presentations to conferences/workshops are also included.

  13. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  14. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  15. Contractor Performed Quality Control on KyTC Projects.

    DOT National Transportation Integrated Search

    2002-08-01

    This report addresses issues related to transferring the responsibility for quality control from the Kentucky Transportation Cabinet (KyTC) to construction contractors. : Several key topics related to Contractor Performed Quality Control (CPQC) are p...

  16. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  17. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  18. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  19. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  20. 28 CFR 115.77 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  1. 28 CFR 115.177 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be prohibited... violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  2. 28 CFR 115.177 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be prohibited... violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  3. 28 CFR 115.77 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  4. 28 CFR 115.77 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volunteers. 115.77 Section 115.77 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  5. 28 CFR 115.177 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... volunteers. 115.177 Section 115.177 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be prohibited... violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  6. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prescribed in 237.7603, use the following clause: Continuation of Mission Essential Functions (Date) (a) The... contractor services in support of mission-essential functions. The contractor-provided services that have been determined to be essential contractor services in support of mission-essential functions are...

  7. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  8. FY 1978 scientific and technical reports, articles, papers, and presentations. [bibliography

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1978-01-01

    Abstracts of 73 technical papers published or presented by MSFC personnel in FY-78 are presented. In addition, over 400 papers by contractors to that facility are listed along with the STAR document number for each report. Titles of 208 additional papers already cleared for publication are included.

  9. 28 CFR 115.377 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... volunteers. 115.377 Section 115.377 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... any other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  10. 28 CFR 115.377 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... volunteers. 115.377 Section 115.377 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... any other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  11. 28 CFR 115.377 - Corrective action for contractors and volunteers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... volunteers. 115.377 Section 115.377 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE... for contractors and volunteers. (a) Any contractor or volunteer who engages in sexual abuse shall be... any other violation of agency sexual abuse or sexual harassment policies by a contractor or volunteer. ...

  12. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) andmore » subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.« less

  13. Seeing Glass Contractors Clearly.

    ERIC Educational Resources Information Center

    Deliberato, Jerry

    2003-01-01

    Offers seven tips for finding and working with an effective glass contractor. For example, schools should consider the company's reputation and longevity of service, and whether it has in-house engineering capabilities. (EV)

  14. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470 Contractor...

  15. 48 CFR 252.204-7010 - Requirement for Contractor to Notify DoD if the Contractor's Activities are Subject to Reporting...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of vulnerabilities to IAEA inspections or visits; (ii) Notify the Contractor of the time at which the... with DoD officials in the assessment of vulnerabilities to IAEA inspections or visits. (d) Following a...) Whether the Contractor's facility has any vulnerabilities where potentially declarable activities under...

  16. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees...

  17. 48 CFR 236.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTS Special Aspects of Contracting for Construction 236.201 Evaluation of contractor performance. (a) Preparation of performance evaluation reports. Use DD Form 2626, Performance Evaluation (Construction... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Evaluation of contractor...

  18. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... required service. (B) Production capability. An evaluation of the prospective contractor's ability to plan.... (C) Quality assurance capability. An assessment of the prospective contractor's capability to meet the quality assurance requirements of the proposed contract. It may involve an evaluation of the...

  19. 32 CFR 516.21 - Litigation against government contractors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Litigation against government contractors. 516... Litigation against government contractors. (a) General. A contract might require that the government... the underlying contract with the government requires reimbursement for adverse judgments or costs of...

  20. 10 CFR 1060.201 - Relatives, contractors, and assistance award recipients.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Relatives, contractors, and assistance award recipients... under § 1060.101(a)(1), a DOE contractor or a DOE assistance award recipient or the employee of a DOE contractor or a DOE assistance award recipient unless the travel expenses are incurred with respect to...

  1. 10 CFR 1060.201 - Relatives, contractors, and assistance award recipients.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Relatives, contractors, and assistance award recipients... under § 1060.101(a)(1), a DOE contractor or a DOE assistance award recipient or the employee of a DOE contractor or a DOE assistance award recipient unless the travel expenses are incurred with respect to...

  2. 10 CFR 1060.201 - Relatives, contractors, and assistance award recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Relatives, contractors, and assistance award recipients... under § 1060.101(a)(1), a DOE contractor or a DOE assistance award recipient or the employee of a DOE contractor or a DOE assistance award recipient unless the travel expenses are incurred with respect to...

  3. 10 CFR 1060.201 - Relatives, contractors, and assistance award recipients.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Relatives, contractors, and assistance award recipients... under § 1060.101(a)(1), a DOE contractor or a DOE assistance award recipient or the employee of a DOE contractor or a DOE assistance award recipient unless the travel expenses are incurred with respect to...

  4. 10 CFR 1060.201 - Relatives, contractors, and assistance award recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Relatives, contractors, and assistance award recipients... under § 1060.101(a)(1), a DOE contractor or a DOE assistance award recipient or the employee of a DOE contractor or a DOE assistance award recipient unless the travel expenses are incurred with respect to...

  5. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  6. A Guide to Resolving Disputes Over Contractor Delay Entitlements.

    DTIC Science & Technology

    1993-12-01

    E. Sanvido Associate Professor of Architectural Engineering Chin Y. Ku Professor f Civil Engineering Head of th Department of Accesion For Civil an...specifically states otherwise, the contractor is generally entitled to recover losses sustained by delays caused by the owner. 18 In the 1961 appeal, In Re...of time for causes beyond the contractor’s control foreclosed the contractor from recovering damage sustained by him because of the City’s failure to

  7. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracts, or contracts which provide for progress payments based on costs or on a percentage or stage of...) Packaging. An assessment of the prospective contractor's ability to meet all contractual packaging...)). (E) Plant safety. An assessment of the prospective contractor's ability to meet the safety...

  8. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... real property. Real property shall be acquired in accordance with 48 CFR subpart 917.74. (d) Advance notice of proposed subcontract awards. Advance notice shall be provided in accordance with 48 CFR 970.... (i) Contractor-affiliated sources. Equipment, materials, supplies, or services from a contractor...

  9. 48 CFR 970.5244-1 - Contractor purchasing system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... real property. Real property shall be acquired in accordance with 48 CFR subpart 917.74. (d) Advance notice of proposed subcontract awards. Advance notice shall be provided in accordance with 48 CFR 970.... (i) Contractor-affiliated sources. Equipment, materials, supplies, or services from a contractor...

  10. 48 CFR 36.201 - Evaluation of contractor performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  11. 48 CFR 49.405 - Completion by another contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completion by another contractor. 49.405 Section 49.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... contractor. If the surety does not arrange for completion of the contract, the contracting officer normally...

  12. 77 FR 43078 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  13. 78 FR 12316 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  14. Independent contractors versus employees: the costs and benefits for your practice.

    PubMed

    Buzogany, William A; Mueller, Michael J

    2010-01-01

    Every business is interested in reducing costs. Payroll and employee benefit costs can be reduced through the use of independent contractors, because they are not employees to whom training, overtime wages, and benefits must be provided. Using the services of an independent contractor presents some disadvantages, however, as an independent contractor cannot be controlled and disciplined in the same fashion as an employee. There are a variety of tests applied under various statutes to determine whether an individual is an employee or an independent contractor, and it is important to carefully analyze all of the facts of a given situation in light of these tests before entering into an independent contractor relationship. If you engage an individual as an independent contractor, and that individual is found to actually be an employee, your business may be subject to significant financial penalties.

  15. Contractor Logistics Support in the U.S. Air Force

    DTIC Science & Technology

    2009-01-01

    limits), or it can engage in a mix of the two approaches.2 This monograph addresses CLS, which is defined as contractor sustainment of a weapon system...organic facilities; it can pay contractors to do the work (subject to some congressional limits); or it can apply a mix of the two approaches.2 Organic...levels are largely stable and represent a mix of services, including contractor operated facilities and instal- Figure 3.1 Air Force CSS for Weapon

  16. 10 CFR 824.16 - Direction to NNSA contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Direction to NNSA contractors. 824.16 Section 824.16 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR THE ASSESSMENT OF CIVIL PENALTIES FOR CLASSIFIED... the following actions that direct NNSA contractors or subcontractors. (1) Subpoenas; (2) Orders to...

  17. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CCR) database means the primary Government repository for Contractor information required for the...) for the same concern. Registered in the CCR database means that— (1) The Contractor has entered all... Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the CCR database; and...

  18. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  19. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  20. 76 FR 11414 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions (DFARS Case... (DFARS) to require contractors to report independent research and development (IR&D) projects generating... the address shown below on or before May 2, 2011, to be considered in the formation of the final rule...

  1. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    NASA Astrophysics Data System (ADS)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  2. 30 CFR 46.12 - Responsibility for independent contractor training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... providing new miner training, newly hired experienced miner training, new task training, and annual... which the contractor is aware that may be created by the performance of the contractor's work at the...

  3. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  4. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  5. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  6. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  7. 10 CFR 727.6 - What are the obligations of a DOE contractor?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMPUTERS § 727.6 What are the obligations of a DOE contractor? (a) A DOE contractor must ensure that... computer unless the DOE contractor has obtained a written acknowledgment and consent by each contractor or... violates the requirements of this section with regard to a DOE computer with Restricted Data or other...

  8. 48 CFR 52.204-7 - Central Contractor Registration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CCR) database means the primary Government repository for Contractor information required for the...) for the same concern. Registered in the CCR database means that— (1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and (2) The...

  9. 32 CFR 516.21 - Litigation against government contractors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Litigation against government contractors. 516.21 Section 516.21 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL... lawsuit requests representation by DOJ, the Army presumes the contractor will obtain private counsel to...

  10. 10 CFR 820.13 - Direction to NNSA contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Direction to NNSA contractors. 820.13 Section 820.13 Energy DEPARTMENT OF ENERGY PROCEDURAL RULES FOR DOE NUCLEAR ACTIVITIES General § 820.13 Direction to..., issues and serves the following actions that direct NNSA contractors: (1) Subpoenas; (2) Orders to compel...

  11. 10 CFR 851.45 - Direction to NNSA contractors.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Direction to NNSA contractors. 851.45 Section 851.45 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Enforcement Process § 851.45 Direction to... than the Director, signs, issues and serves the following actions that direct NNSA contractors: (1...

  12. 3 CFR - Addressing Tax Delinquency by Government Contractors

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 3 The President 1 2011-01-01 2011-01-01 false Addressing Tax Delinquency by Government Contractors Presidential Documents Other Presidential Documents Memorandum of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of Executive Departments and Agencies The Federal Government pays more than half a...

  13. ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment

    NASA Technical Reports Server (NTRS)

    Boor, J. L.; Braunstein, J.; Janky, J. M.; Ogden, D.; Potter, J. G.; Harper, E. L.; Volkmer, E.; Whalen, A. A.; Henderson, E.; Hupe, H. H.

    1975-01-01

    An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.

  14. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  15. Technology Program Management Model (TPMM) Overview

    DTIC Science & Technology

    2006-05-10

    1 1 “Secure the High Ground” Jeff Craver Project Manager Space and Missile Defense Technical Center Jeff.Craver@US.Army.Mil ff r r r j t r i il...f i l t r ff. r r . r . il UNCLASSIFIED UNCLASSIFIED Technology Program Management Model (TPMM) Overview 05-10-2006 Report Documentation Page Form...DATES COVERED 00-00-2006 to 00-00-2006 4. TITLE AND SUBTITLE Technology Program Management Model (TPMM) Overview 5a. CONTRACT NUMBER 5b. GRANT

  16. Skylab checkout operations. [from multiple docking adapter contractor viewpoint

    NASA Technical Reports Server (NTRS)

    Timmons, K. P.

    1973-01-01

    The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.

  17. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  18. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  19. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  20. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  1. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  2. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  3. NASA scientific and technical program: User survey

    NASA Technical Reports Server (NTRS)

    Hunter, Judy F.; Shockley, Cynthia W.

    1993-01-01

    Results are presented of an intensive user requirements survey conducted by NASA's Scientific and Technical Information (STI) Program with the goal of improving the foundation for the user outreach program. The survey was carried out by interviewing 550 NASA scientists, engineers, and contractors and by analyzing 650 individual responses to a mailed out questionnaire. To analyze the user demographic data, a data base was built and used, and will be applied to ongoing analysis by the NASA STI Program.

  4. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  5. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free of...

  6. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Providing technical data...

  7. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Providing technical data...

  8. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Providing technical data...

  9. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Providing technical data...

  10. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Providing technical data...

  11. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  12. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractors' property management system compliance. 45.105 Section 45.105 Federal Acquisition Regulations System FEDERAL... the contractor's property management policies, procedures, practices, and systems. This analysis shall...

  13. 48 CFR 45.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contractors' property management system compliance. 45.105 Section 45.105 Federal Acquisition Regulations System FEDERAL... the contractor's property management policies, procedures, practices, and systems. This analysis shall...

  14. Highlights of contractor initiatives in quality enhancement and productivity improvement

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  15. 14 CFR 1240.105 - Special procedures-NASA and NASA contractor employees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Special procedures-NASA and NASA contractor...—NASA and NASA contractor employees. (a) A NASA Headquarters office, a NASA field installation, or a NASA contractor may submit to the Board an application for an award identifying the originator(s) of...

  16. 14 CFR 1240.105 - Special procedures-NASA and NASA contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Special procedures-NASA and NASA contractor...—NASA and NASA contractor employees. (a) A NASA Headquarters office, a NASA field installation, or a NASA contractor may submit to the Board an application for an award identifying the originator(s) of...

  17. 14 CFR 1240.105 - Special procedures-NASA and NASA contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Special procedures-NASA and NASA contractor...—NASA and NASA contractor employees. (a) A NASA Headquarters office, a NASA field installation, or a NASA contractor may submit to the Board an application for an award identifying the originator(s) of...

  18. 48 CFR 852.236-72 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  19. First Chance Network and Technical Assistance

    ERIC Educational Resources Information Center

    Trohanis, Pascal L.

    1973-01-01

    Article seeks to cover the following topics: an overview of First Chance; a description of TADS (Technical Assistance Development System); and a discussion of the organization's Media and Information division. (Author)

  20. 48 CFR 642.1503-70 - Contractor Performance System (CPS).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor Performance System (CPS). 642.1503-70 Section 642.1503-70 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contractor Performance Information 642.1503...

  1. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...

  2. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...

  3. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...

  4. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...

  5. 48 CFR 227.7203-11 - Contractor procedures and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...

  6. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...

  7. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...

  8. Key aspects in managing safety when working with multiple contractors: A case study.

    PubMed

    Drupsteen, Linda; Rasmussen, Hanna B; Ustailieva, Erika; van Kampen, Jakko

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues are explored through a brief survey and a workshop in the maintenance department of a logistics company. The results indicate that culture and behavior are recognized differently by clients and by contractors. The contractors and client had different perceptions of involvement of contractors by the client. The contractors complained on lack of involvement, which was not fully recognized by the client. The case study used a practical approach to show differences in perception of safety within a project. The study illustrates the need for more applied studies and interventions on contractor safety.

  9. 48 CFR 52.247-30 - F.o.b. Origin, Contractor's Facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false F.o.b. Origin, Contractor... Clauses 52.247-30 F.o.b. Origin, Contractor's Facility. As prescribed in 47.303-2(c), insert the following clause in solicitations and contracts when the delivery term is f.o.b. origin, contractor's facility: F.o...

  10. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  11. 76 FR 52133 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security..., entitled ``Contractors Performing Private Security Functions in Areas of Combat Operations or Other... of DoD and other Governmental private security contractors. A clause to cover the interagency...

  12. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...

  13. 76 FR 81490 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... Activities; Proposed Collection; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal... identify the Docket ID Number EPA-HQ-OARM-2011-0997, Contractor Cumulative Claim and Reconciliation. Hand... information collection activity or ICR does this apply to? Affected entities: All contractors who have...

  14. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  15. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  16. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  17. 77 FR 52107 - Air Traffic Data in the Possession of Government Contractors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... Government Contractors AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice. SUMMARY: The... possession of government contractors providing operational services to the FAA. This notice specifies how and... contractors. SUPPLEMENTARY INFORMATION: A. Background On August 3, 2012, the Pilot's Bill of Rights, Public...

  18. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  19. 76 FR 4343 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ...; Contractor Conflicts of Interest AGENCY: Environmental Protection Agency. ACTION: Notice. SUMMARY: In... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors... cleanup and enforcement and because its contractors are often involved in both activities, it is...

  20. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... Regulation; Contractor Comment Period, Past Performance Evaluations AGENCY: Department of Defense (DoD...) to implement provisions of law limiting the periods allowed for contractor comments on past....S.C. 2302 Note). Section 853, entitled ``Inclusion of Data on Contractor Performance in Past...

  1. The main factor affecting the competitiveness of Contractor Company

    NASA Astrophysics Data System (ADS)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  2. Construction Manager or General Contractor?

    ERIC Educational Resources Information Center

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  3. A Case Study on the Status of Technical and Vocational Education in Thailand. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Shoolap, Charoon; Choomnoom, Siripan

    This two-part report presents an overview of the vocational and technical education system in Thailand. The first part is a review of the current and likely future situations pertaining to vocational and technical education in that country. An analysis of economic conditions, human resource development, and the existing technical and vocational…

  4. Reforming the American Military Officer Personnel System: Addendum: Thoughts on Contractors

    DTIC Science & Technology

    2016-05-24

    Testimony Reforming the American Military Officer Personnel System Addendum: Thoughts on Contractors Bernard D. Rostker CT-446/1 Document...1 Reforming the American Military Officer Personnel System Addendum: Thoughts on Contractors Testimony of Bernard D. Rostker 1 The RAND...Reform and Strengthening the All-Volunteer Force” on December 2, 2015, comment on the need to understand when contractors are being utilized and

  5. Space plasma contractor research, 1988

    NASA Technical Reports Server (NTRS)

    Williams, John D.; Wilbur, Paul J.

    1989-01-01

    Results of experiments conducted on hollow cathode-based plasma contractors are reported. Specific tests in which attempts were made to vary plasma conditions in the simulated ionospheric plasma are described. Experimental results showing the effects of contractor flowrate and ion collecting surface size on contactor performance and contactor plasma plume geometry are presented. In addition to this work, one-dimensional solutions to spherical and cylindircal space-charge limited double-sheath problems are developed. A technique is proposed that can be used to apply these solutions to the problem of current flow through elongated double-sheaths that separate two cold plasmas. Two conference papers which describe the essential features of the plasma contacting process and present data that should facilitate calibration of comprehensive numerical models of the plasma contacting process are also included.

  6. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... Activities; Proposed Collection; Comment Request; Contractor Conflicts of Interest AGENCY: Environmental....regulations.gov . Title: Contractor Conflicts of Interest. ICR numbers: EPA ICR No. 1550.09, OMB Control No... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors...

  7. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  8. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  9. 48 CFR 452.215-71 - Instructions for the Preparation of Technical and Business Proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contained in the technical proposal so that the contractor's understanding of the statement of work may be... required if appropriate.) (2) Business Proposal. (a) Furnish financial statements for the last two years... specified in the statement of work. Any “alternate” proposal may be considered if overall performance would...

  10. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... investigations according to DOT Order 1630.2B, Personnel Security Management. f. The Contractor shall immediately notify the contracting officer when an employee no longer requires access to DOT computer systems due to transfer, completion of a project retirement or termination of employment. g. The Contractor shall include...

  11. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... determinations in FAR subpart 9.1 and the impact of a contractor with more than one contract to have a negative... forecasting and cost controlling and the impact on future contracts. This respondent felt that a contractor... (including potential economic, environmental, public health and safety effects, distributive impacts, and...

  12. Contractors are cautiously optimistic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-10-01

    Anticipating stable crew counts and marginal increases in operator exploration budgets, geophysical contractors are cautiously optimistic about continued industry growth. Most companies are operating on lean profits, and more business consolidations are expected as the market gradually rebounds. Prospects for an upturn in geophysical operations by oil companies are discussed.

  13. Technology advancements for the U.S. manned Space Station - An overview

    NASA Technical Reports Server (NTRS)

    Simon, William E.

    1987-01-01

    The structure and methodology of the Johnson Space Center (JSC) advanced development program is described. An overview of the program is given, and the technology transfer process to other disciplines is described. The test bed and flight experiment programs are described, as is the technology assessment which was performed at the end of the Phase B program. The technology program within each discipline is summarized, and the coordination and integration of the JSC program with the activities of other NASA centers and with work package contractors are discussed.

  14. 48 CFR 1845.7101-4 - Types of deletions from contractor property records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Types of deletions from contractor property records. Contractors shall report the types of deletions... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Types of deletions from contractor property records. 1845.7101-4 Section 1845.7101-4 Federal Acquisition Regulations System NATIONAL...

  15. 48 CFR 1845.7101-4 - Types of deletions from contractor property records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Types of deletions from contractor property records. Contractors shall report the types of deletions... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Types of deletions from contractor property records. 1845.7101-4 Section 1845.7101-4 Federal Acquisition Regulations System NATIONAL...

  16. 48 CFR 1845.7101-4 - Types of deletions from contractor property records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Types of deletions from contractor property records. Contractors shall report the types of deletions... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Types of deletions from contractor property records. 1845.7101-4 Section 1845.7101-4 Federal Acquisition Regulations System NATIONAL...

  17. 48 CFR 1845.7101-4 - Types of deletions from contractor property records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Types of deletions from contractor property records. Contractors shall report the types of deletions... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Types of deletions from contractor property records. 1845.7101-4 Section 1845.7101-4 Federal Acquisition Regulations System NATIONAL...

  18. 48 CFR 1845.7101-4 - Types of deletions from contractor property records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Types of deletions from contractor property records. Contractors shall report the types of deletions... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Types of deletions from contractor property records. 1845.7101-4 Section 1845.7101-4 Federal Acquisition Regulations System NATIONAL...

  19. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  20. Quality based prequalification of contractors

    DOT National Transportation Integrated Search

    2001-08-01

    This report summarizes the efforts to provide the Kentucky Transportation Cabinet with a system for evaluating the quality of the performance of contractors on highway construction projects and using that evaluation in the Cabinet's annual prequalifi...

  1. Philosophical and Sociological Overview of Vocational Technical Education in Nigeria

    ERIC Educational Resources Information Center

    Kennedy, Odu Oji

    2012-01-01

    Vocational Technical Education is any kind of education which has the main purpose of preparing one for employment in recognized occupation. The foundation of vocational technical education is based on philosophy which was mainly established for self-employment and self-reliance of the individual(s) who partake in it. Viewing the philosophy and…

  2. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  3. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... 0750-AH28 Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security... Contractors (DoDI 3020.50) was revised on August 1, 2011, and the final rule to implement section 862 of the NDAA for FY 2008, as amended, 32 CFR part 159, Private Security Contractors Operating in Contingency...

  4. New Mexico Standards Based Assessment (NMSBA) Technical Report: 2006 Spring Administration

    ERIC Educational Resources Information Center

    Griph, Gerald W.

    2006-01-01

    The purpose of the NMSBA technical report is to provide users and other interested parties with a general overview of and technical characteristics of the 2006 NMSBA. The 2006 technical report contains the following information: (1) Test development; (2) Scoring procedures; (3) Calibration, scaling, and equating procedures; (4) Standard setting;…

  5. Overviews of the Apollo Program and Its Management

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This special bibliography includes items individually selected by scientific and technical information professionals that provide an overview of the history, events, and results of the Apollo missions. Planning, scheduling, and management are also included.

  6. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  7. 77 FR 70780 - Federal Acquisition Regulation; Submission for OMB Review; Contractors Performing Private...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ...; Submission for OMB Review; Contractors Performing Private Security Functions Outside the United States... new information collection requirement concerning Contractors Performing Private Security Functions... identified by Information Collection 9000- 0184, Contractors Performing Private Security Functions Outside...

  8. Orbital atomic oxygen effects on materials: An overview of MSFC experiments on the STS-46 EOIM-3

    NASA Astrophysics Data System (ADS)

    Linton, Roger C.; Vaughn, Jason A.; Finckenor, Miria M.; Kamenetzky, Rachel R.; Dehaye, Robert F.; Whitaker, Ann F.

    1995-02-01

    The third Evaluation of Oxygen Interaction with Materials experiment was flown on Space Shuttle Mission STS-46 (July 31 - August 8, 1992), representing a joint effort of several NASA centers, universities, and contractors. This array of active instrumentation and material exposure sub-assemblies was integrated as a Shuttle cargo bay pallet experiment for investigating the effects of orbital atomic oxygen on candidate space materials. Marshall Space Flight Center contributed several passive exposure trays of material specimens, uniform stress and static stress material exposure fixtures, the Atomic Oxygen Resistance Monitor (AORM), and specimens of thermal coatings for the EOIM-3 variable exposure mechanisms. As a result of 42 hours of spacecraft velocity vector-oriented exposure during the later phases of the STS-46 mission in LEO, EOIM-3 materials were exposed to an atomic oxygen fluence of 2.2 x 10(exp 20) atoms/sq cm. In this paper, an overview is presented of the technical approaches and results from analyses of the MSFC flight specimens, fixtures, and the AORM. More detailed results from earlier EOIM missions, the LDEF, and from laboratory testing are included in associated papers of this conference session.

  9. Orbital atomic oxygen effects on materials: An overview of MSFC experiments on the STS-46 EOIM-3

    NASA Technical Reports Server (NTRS)

    Linton, Roger C.; Vaughn, Jason A.; Finckenor, Miria M.; Kamenetzky, Rachel R.; Dehaye, Robert F.; Whitaker, Ann F.

    1995-01-01

    The third Evaluation of Oxygen Interaction with Materials experiment was flown on Space Shuttle Mission STS-46 (July 31 - August 8, 1992), representing a joint effort of several NASA centers, universities, and contractors. This array of active instrumentation and material exposure sub-assemblies was integrated as a Shuttle cargo bay pallet experiment for investigating the effects of orbital atomic oxygen on candidate space materials. Marshall Space Flight Center contributed several passive exposure trays of material specimens, uniform stress and static stress material exposure fixtures, the Atomic Oxygen Resistance Monitor (AORM), and specimens of thermal coatings for the EOIM-3 variable exposure mechanisms. As a result of 42 hours of spacecraft velocity vector-oriented exposure during the later phases of the STS-46 mission in LEO, EOIM-3 materials were exposed to an atomic oxygen fluence of 2.2 x 10(exp 20) atoms/sq cm. In this paper, an overview is presented of the technical approaches and results from analyses of the MSFC flight specimens, fixtures, and the AORM. More detailed results from earlier EOIM missions, the LDEF, and from laboratory testing are included in associated papers of this conference session.

  10. 77 FR 17098 - Proposed Extension of Existing Information Collection; Independent Contractor Registration and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...

  11. Contractor assistance in highway maintenance : state-of-the-art evaluation.

    DOT National Transportation Integrated Search

    1980-01-01

    The purpose of this study was to perform a state-of-the art evaluation of contractor assistance in Virginia's highway maintenance. The study revealed that expenditures for contractor assistance accounted for 2.79% of the total expenditure on ordinary...

  12. 77 FR 43039 - Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the United.... 110-181, enacted January 28, 2008), section 862, entitled ``Contractors Performing Private Security... NDAA required standardization of rules for private security contractors that are performing in...

  13. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  14. 78 FR 37670 - Federal Acquisition Regulation; Contractors Performing Private Security Functions Outside the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ...] RIN 9000-AM20 Federal Acquisition Regulation; Contractors Performing Private Security Functions...-181). Section 862, entitled ``Contractors Performing Private Security Functions in Areas of Combat...), as amended, entitled ``Contractors Performing Private Security Functions in Areas of Combat...

  15. Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hult, Erin; Granderson, Jessica; Mathew, Paul

    While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hourmore » onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.« less

  16. 48 CFR 252.225-7039 - Contractors performing private security functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by Contractors performing private security functions; (A) All armored vehicles, helicopters, and... private security functions. 252.225-7039 Section 252.225-7039 Federal Acquisition Regulations System... security functions. As prescribed in 225.370-6, insert the following clause: CONTRACTORS PERFORMING PRIVATE...

  17. Technical skills requirement of Indonesian construction labors to work in Malaysia

    NASA Astrophysics Data System (ADS)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  18. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  19. 76 FR 23357 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... Contractors and Subcontractors Regarding Protected Veterans; Proposed Rule #0;#0;Federal Register / Vol. 76... Nondiscrimination Obligations of Contractors and Subcontractors Regarding Protected Veterans AGENCY: Office of..., which requires covered Federal contractors and subcontractors to take affirmative action in employment...

  20. Powder River lures contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-10-01

    Drilling successes are stimulating a high level of geophysical activity in the Powder River Basin. Focused in areas of concentrated exploration, a majority of speculative surveys are specifically designed to delineate target formations. Several contractors credit available data with an increased amount of current and proposed exploration. Geophysical surveying operations in the northern Rockies are discussed.