Sample records for technical performance schedule

  1. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF CLASS II GAMES § 547.12 What are the minimum technical standards for downloading on a Class II... software, files, data, and prize schedules. (2) Downloads of software, games, prize schedules, or other... performed in a manner that will not affect game play. (5) Downloads shall not affect the integrity of...

  2. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF CLASS II GAMES § 547.12 What are the minimum technical standards for downloading on a Class II... software, files, data, and prize schedules. (2) Downloads of software, games, prize schedules, or other... performed in a manner that will not affect game play. (5) Downloads shall not affect the integrity of...

  3. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF CLASS II GAMES § 547.12 What are the minimum technical standards for downloading on a Class II... software, files, data, and prize schedules. (2) Downloads of software, games, prize schedules, or other... performed in a manner that will not affect game play. (5) Downloads shall not affect the integrity of...

  4. System engineering techniques for establishing balanced design and performance guidelines for the advanced telerobotic testbed

    NASA Technical Reports Server (NTRS)

    Zimmerman, W. F.; Matijevic, J. R.

    1987-01-01

    Novel system engineering techniques have been developed and applied to establishing structured design and performance objectives for the Telerobotics Testbed that reduce technical risk while still allowing the testbed to demonstrate an advancement in state-of-the-art robotic technologies. To estblish the appropriate tradeoff structure and balance of technology performance against technical risk, an analytical data base was developed which drew on: (1) automation/robot-technology availability projections, (2) typical or potential application mission task sets, (3) performance simulations, (4) project schedule constraints, and (5) project funding constraints. Design tradeoffs and configuration/performance iterations were conducted by comparing feasible technology/task set configurations against schedule/budget constraints as well as original program target technology objectives. The final system configuration, task set, and technology set reflected a balanced advancement in state-of-the-art robotic technologies, while meeting programmatic objectives and schedule/cost constraints.

  5. The Effects of Varying Schedules of Incentive Delivery on Technical Training.

    ERIC Educational Resources Information Center

    Pritchard, Robert D.; And Others

    The research reported here was initiated and designed to assess the impact of various schedules of incentive delivery (schedules of reinforcement) on performance and attitudes in an Air Force-related setting. Civilian subjects matching the characteristics of Air Force trainees were hired to work for four weeks, one week under each of four…

  6. 2016 Rio Olympic Games: Can the schedule of events compromise athletes' performance?

    PubMed

    Rosa, João Paulo P; Rodrigues, Dayane F; Silva, Andressa; de Moura Simim, Mário Antônio; Costa, Varley T; Noce, Franco; de Mello, Marco Túlio

    2016-01-01

    The organizing committee of the 2016 Rio Olympic Games recently announced that some of the preliminary and final competitions will be held at night. The present article discusses the potential harmful effects of these late-night competitions on sleep, circadian rhythms and athletic performance during the Olympic Games. Specifically, night-time competition could lead to injury and may compromise an athlete's decision-making, attentional, physiological and other processes. Consequently, these impacts could negatively affect the performance of athletes and their teams. Thus, it is suggested that technical commissions take special care when creating strategies to minimize harm to the athletes by considering factors such as light exposure, melatonin intake, sleep hygiene and scheduled naps, and training at local competition time. Furthermore, it is necessary for specialists in chronobiology and sleep to engage with members of the national teams to develop an activity schedule for physical, technical, tactical and psychological preparation that accounts for circadian rhythms, thereby creating the best possible environment for the athletes to achieve their ideal performance.

  7. A Correlation Between Quality Management Metrics and Technical Performance Measurement

    DTIC Science & Technology

    2007-03-01

    Engineering Working Group SME Subject Matter Expert SoS System of Systems SPI Schedule performance Index SSEI System of Systems Engineering and...and stated as such [Q, M , M &G]. The QMM equation is given by: 12 QMM=0.92RQM+0.67EPM+0.55RKM+1.86PM, where: RGM is the requirements management...schedule. Now if corrective action is not taken, the project/task will be completed behind schedule and over budget. m . As well as the derived

  8. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  9. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  10. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  11. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  12. Hanford business structure for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Hanford Business Structure integrates the project`s technical, schedule, and cost baselines; implements the use of a standard code of accounts; and streamlines performance reporting and cost collection. Technical requirements drive the technical functions and come from the RDD 100 database. The functions will be identified in the P3 scheduling system and also in the PeopleSoft system. Projects will break their work down from the technical requirements in the P3 schedules. When the level at which they want to track cost via the code of accounts is reached, a Project ID will be generated in the PeopleSoft system. P3 maymore » carry more detailed schedules below the Project ID level. The standard code of accounts will identify discrete work activities done across the site and various projects. They will include direct and overhead type work scopes. Activities in P3 will roll up to this standard code of accounts. The field that will be used to record this in PeopleSoft is ``Activity``. In Passport it is a user-defined field. It will have to be added to other feeder systems. Project ID and code of accounts are required fields on all cost records.« less

  13. An assessment of PERT as a technique for schedule planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1982-01-01

    The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

  14. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance.

    PubMed

    Carter, Christine E; Grahn, Jessica A

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the "contextual interference effect." While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule, although results varied across raters. Participant questionnaires also revealed that the interleaved practice schedule had positive effects on factors such as goal setting, focus, and mistake identification. Taken together, these results suggest that an interleaved practice schedule may be a more effective practice strategy than continuous repetition in a music-learning context.

  15. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance

    PubMed Central

    Carter, Christine E.; Grahn, Jessica A.

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the “contextual interference effect.” While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule, although results varied across raters. Participant questionnaires also revealed that the interleaved practice schedule had positive effects on factors such as goal setting, focus, and mistake identification. Taken together, these results suggest that an interleaved practice schedule may be a more effective practice strategy than continuous repetition in a music-learning context. PMID:27588014

  16. Job Scheduling in a Heterogeneous Grid Environment

    NASA Technical Reports Server (NTRS)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  17. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    NASA Technical Reports Server (NTRS)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  18. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  19. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  20. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  1. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  2. Transformational leadership, initiating structure, and substitutes for leadership: a longitudinal study of research and development project team performance.

    PubMed

    Keller, Robert T

    2006-01-01

    Transformational leadership, initiating structure, and selected substitutes for leadership were studied as longitudinal predictors of performance in 118 research and development (R&D) project teams from 5 firms. As hypothesized, transformational leadership predicted 1-year-later technical quality, schedule performance, and cost performance and 5-year-later profitability and speed to market. Initiating structure predicted all the performance measures. The substitutes of subordinate ability and an intrinsically satisfying task each predicted technical quality and profitability, and ability predicted speed to market. Moderator effects for type of R&D work were hypothesized and found whereby transformational leadership was a stronger predictor of technical quality in research projects, whereas initiating structure was a stronger predictor of technical quality in development projects. Implications for leadership theory and research are discussed. (c) 2006 APA, all rights reserved.

  3. 48 CFR 245.603-70 - Contractor performance of plant clearance duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government-furnished property from inventory schedules; (v) Evaluate physical, quantitative, and technical allocability of contractor inventory prior to disposal using Standard Form 1423, Inventory Verification Survey...

  4. Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

    NASA Astrophysics Data System (ADS)

    Vilja, John; Levack, Daniel

    1993-04-01

    The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

  5. Comparison of Final Grades between a Traditional Classroom and Learning Community Classroom at Northeast Wisconsin Technical College.

    ERIC Educational Resources Information Center

    Van Beek, Dianne

    This study examines courses in the marketing program at Northeast Wisconsin Technical College to compare the academic performance of students in traditional and learning community classroom settings. Two sections of students, a traditional 17-week course and a block scheduled 5-week course, served as the sample in the study. The block scheduling…

  6. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  7. Satellite voice broadcast. Volume 2: System study

    NASA Technical Reports Server (NTRS)

    Bachtell, E. E.; Bettadapur, S. S.; Coyner, J. V.; Farrell, C. E.

    1985-01-01

    The Technical Volume of the Satellite Broadcast System Study is presented. Designs are synthesized for direct sound broadcast satellite systems for HF-, VHF-, L-, and Ku-bands. Methods are developed and used to predict satellite weight, volume, and RF performance for the various concepts considered. Cost and schedule risk assessments are performed to predict time and cost required to implement selected concepts. Technology assessments and tradeoffs are made to identify critical enabling technologies that require development to bring technical risk to acceptable levels for full scale development.

  8. Putting EVM to the Test

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald; Counts, Stacy

    2005-01-01

    IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

  9. NASA Earned Value Management (EVM) Update

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald

    2013-01-01

    Earned Value Management (EVM) is an integrated management control system for assessing, understanding and qualifying what a project is achieving with the resoures. EVM integrates technical cost and schedules with risk management. It allows objective assessment and quantification of current project performance, and helps predict future performance-based trents.

  10. 48 CFR 2937.602 - Elements of performance-based contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...

  11. External Tank Program Legacy of Success

    NASA Technical Reports Server (NTRS)

    Welzyn, Ken; Pilet, Jeff

    2010-01-01

    I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.

  12. Advanced Mirror Technology Development (AMTD) Project Status

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2014-01-01

    To date, AMTD Phase 1 has accomplished all of its technical tasks on-schedule and on-budget. AMTD was awarded a Phase 2 contract. We are now performing Phase 2 tasks along with those tasks continued from Phase 1.

  13. High Performance Asynchronous Limited Sensing Algorithms for CSMA and CSMA-CD Channels.

    DTIC Science & Technology

    1985-03-01

    for CSM and CSMA-CD Channels" M. Geargiopoulos L. Merakos P. Papantoni-Kazakos- Technical Report UCT/ DEECS /TR-85-2 Mrh1985 iDISTRIBUTION STAEmEN 2j C...Perforance Asynchronous Limited Sensing Algoit~5 forCSMAandCSMA-CD Channels" M1. Georgiop0 ul 0 5 L. Merakos P. PaPantoni-.Kazakos Technical Report UCT/ DEECS ...SCHEDULE unlimited. 4 PERFORMING ORGANiZATION REPORT NUMBERIS) 5. MONITORING ORGANIZATION REPORT NUMBERIS" UCT/ DEECS /TR-85-2 SR-TR. 85-0 398 6& NAME OF

  14. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  15. Job Superscheduler Architecture and Performance in Computational Grid Environments

    NASA Technical Reports Server (NTRS)

    Shan, Hongzhang; Oliker, Leonid; Biswas, Rupak

    2003-01-01

    Computational grids hold great promise in utilizing geographically separated heterogeneous resources to solve large-scale complex scientific problems. However, a number of major technical hurdles, including distributed resource management and effective job scheduling, stand in the way of realizing these gains. In this paper, we propose a novel grid superscheduler architecture and three distributed job migration algorithms. We also model the critical interaction between the superscheduler and autonomous local schedulers. Extensive performance comparisons with ideal, central, and local schemes using real workloads from leading computational centers are conducted in a simulation environment. Additionally, synthetic workloads are used to perform a detailed sensitivity analysis of our superscheduler. Several key metrics demonstrate that substantial performance gains can be achieved via smart superscheduling in distributed computational grids.

  16. Squaring the Project Management Circle: Updating the Cost, Schedule, and Performance Methodology

    DTIC Science & Technology

    2016-04-30

    success is measured as achieving technical performance and/or mission performance goals, coupled with customer (warfighter) satisfaction (De Wit, 1988...studies added criteria such as customer satisfaction , efficiency of execution, and effectiveness of the project organization (Pinto & Slevin, 1998...team and the user customer organization, management policy and project control. This clustering of success factors represents the amalgamation of the

  17. 76 FR 48152 - Commercial Building Asset Rating Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ...: Occupancy schedule. HVAC system operation. Hot water use. Both the user-entered and the internally defined.... Technical Support Full documentation of the rating methodology would be available online for public review... welcome. Potential for Additional Supported Options While a national performance metric and rating system...

  18. 7 CFR 1775.20 - Reporting.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) TECHNICAL ASSISTANCE GRANTS Grant Application Processing § 1775.20 Reporting. (a) Grantees shall constantly monitor performance to ensure that time schedules are being met, projected work by time periods is..., results of activity); (2) Analysis of challenges or setbacks that occurred during the grant period; (3...

  19. Carbohydrates for Soccer: A Focus on Skilled Actions and Half-Time Practices

    PubMed Central

    Hills, Samuel P.; Russell, Mark

    2017-01-01

    Carbohydrate consumption is synonymous with soccer performance due to the established effects on endogenous energy store preservation, and physical capacity maintenance. For performance-enhancement purposes, exogenous energy consumption (in the form of drinks, bars, gels and snacks) is recommended on match-day; specifically, before and during match-play. Akin to the demands of soccer, limited opportunities exist to consume carbohydrates outside of scheduled breaks in competition, such as at half-time. The link between cognitive function and blood glucose availability suggests that carbohydrates may influence decision-making and technical proficiency (e.g., soccer skills). However, relatively few reviews have focused on technical, as opposed to physical, performance while also addressing the practicalities associated with carbohydrate consumption when limited in-play feeding opportunities exist. Transient physiological responses associated with reductions in activity prevalent in scheduled intra-match breaks (e.g., half-time) likely have important consequences for practitioners aiming to optimize match-day performance. Accordingly, this review evaluated novel developments in soccer literature regarding (1) the ergogenic properties of carbohydrates for skill performance; and (2) novel considerations concerning exogenous energy provision during half-time. Recommendations are made to modify half-time practices in an aim to enhance subsequent performance. Viable future research opportunities exist regarding a deeper insight into carbohydrate provision on match-day. PMID:29295583

  20. Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.

  1. Life Sciences Centrifuge Facility assessment

    NASA Technical Reports Server (NTRS)

    Benson, Robert H.

    1994-01-01

    This report provides an assessment of the status of the Centrifuge Facility being developed by ARC for flight on the International Space Station Alpha. The assessment includes technical status, schedules, budgets, project management, performance of facility relative to science requirements, and identifies risks and issues that need to be considered in future development activities.

  2. NASA management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Peters, F.

    1975-01-01

    The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

  3. Skills training after night shift work enables acquisition of endovascular technical skills on a virtual reality simulator.

    PubMed

    Naughton, Peter A; Aggarwal, Rajesh; Wang, Tim T; Van Herzeele, Isabelle; Keeling, Aoife N; Darzi, Ara W; Cheshire, Nicholas J W

    2011-03-01

    Adoption of residents' working time restrictions potentially undermines surgical training by reduction of operating room exposure. Simulation has been proposed as a way to acquire necessary skills in a laboratory environment but remains difficult to incorporate into training schedules. This study assessed whether residents working successive nights could acquire endovascular skills similar to colleagues working day shifts. This prospective observational cohort study recruited 20 junior residents, divided into day shift and night shift groups by their respective call schedule. After initial cognitive skills training, a validated renal artery stent module on an endovascular simulator was completed over a series of seven sequential shifts during 1 week. The primary outcome measure was serial technical skill assessments. Secondary measures comprised assessments of activity, cognitive performance, introspective fatigue, quality, and quantity of preceding sleep. Both groups demonstrated significant learning curves for total time at the first session median vs seventh session median (181 vs 564 seconds [P < .001]; night, 1399 vs 572 [P < .001]), fluoroscopy time (day, 702 vs 308 seconds, [P < .001]; night, 669 vs 313 [P < .001]), and contrast volume (day, 29 vs 13 mL [P < .001]; night, 40 vs 16 [P < .001]). Residents working day shifts reached plateau 1 day earlier in the above measures vs those on night duty. The night shift group walked more steps (P < .001), reviewed more patients (P < .001), performed worse on all cognitive assessments (P < .05), slept less (P < .05), had poorer quality of sleep (P = .001), and was more fatigued (P < .001) than the day shift group. Acquired skill was retained a week after completion of shifts. Technical skills training after night shift work enables acquisition of endovascular technical skills, although it takes longer than after day shift training. This study provides evidence for program directors to organize simulation-based training schedules for residents on night shift rotations. Copyright © 2011. Published by Mosby, Inc.

  4. CONTACT: An Air Force technical report on military satellite control technology

    NASA Astrophysics Data System (ADS)

    Weakley, Christopher K.

    1993-07-01

    This technical report focuses on Military Satellite Control Technologies and their application to the Air Force Satellite Control Network (AFSCN). This report is a compilation of articles that provide an overview of the AFSCN and the Advanced Technology Program, and discusses relevant technical issues and developments applicable to the AFSCN. Among the topics covered are articles on Future Technology Projections; Future AFSCN Topologies; Modeling of the AFSCN; Wide Area Communications Technology Evolution; Automating AFSCN Resource Scheduling; Health & Status Monitoring at Remote Tracking Stations; Software Metrics and Tools for Measuring AFSCN Software Performance; Human-Computer Interface Working Group; Trusted Systems Workshop; and the University Technical Interaction Program. In addition, Key Technology Area points of contact are listed in the report.

  5. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  6. Lessons Learned from Ares I Upper Stage Structures and Thermal Design

    NASA Technical Reports Server (NTRS)

    Ahmed, Rafiq

    2012-01-01

    The Ares 1 Upper Stage was part of the vehicle intended to succeed the Space Shuttle as the United States manned spaceflight vehicle. Although the Upper Stage project was cancelled, there were many lessons learned that are applicable to future vehicle design. Lessons learned that are briefly detailed in this Technical Memorandum are for specific technical areas such as tank design, common bulkhead design, thrust oscillation, control of flight and slosh loads, purge and hazardous gas system. In addition, lessons learned from a systems engineering and vehicle integration perspective are also included, such as computer aided design and engineering, scheduling, and data management. The need for detailed systems engineering in the early stages of a project is emphasized throughout this report. The intent is that future projects will be able to apply these lessons learned to keep costs down, schedules brief, and deliver products that perform to the expectations of their customers.

  7. The key to successful management of STS operations: An integrated production planning system

    NASA Technical Reports Server (NTRS)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  8. 76 FR 60359 - Phytosanitary Treatments; Location of and Process for Updating Treatment Schedules; Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Treatment Manual, and we did not retain text explaining that irradiation can be used as a substitute for... irradiation treatment, respectively. Where these sections have referred to facilities capable of performing...)(1) stated that irradiation treatment in accordance with part 305 could be substituted for other...

  9. Performance measurement: A tool for program control

    NASA Technical Reports Server (NTRS)

    Abell, Nancy

    1994-01-01

    Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

  10. SHARP's systems engineering challenge: rectifying integrated product team requirements with performance issues in an evolutionary spiral development acquisition

    NASA Astrophysics Data System (ADS)

    Kuehl, C. Stephen

    2003-08-01

    Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics requirements specifications. Utilizing the draft NAVAIR SE guideline handbook and the ANSI/EIA-632 standard: Processes for Engineering a System, a systems engineering tailored process approach was adopted for the accelerated SHARP EMD prgram. Tailoring SE processes in this accelerated product delivery environment provided unique opportunities to be technically creative in the establishment of a product performance baseline. This paper provides an historical overview of the systems engineering activities spanning the prototype phase through the EMD SHARP program phase, the performance requirement capture activities and refinement process challenges, and what SE process improvements can be applied to future SHARP-like programs adopting a compressed, evolutionary spiral development acquisition paradigm.

  11. Space station program phase B definition: Nuclear reactor-powered space station cost and schedules

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.

  12. Technical Feasibility of a Mobile Context-Aware (Social) Learning Schedule Framework

    ERIC Educational Resources Information Center

    Yau, Jane Y. K.; Joy, Mike

    2013-01-01

    The purpose of this paper is to show the technical feasibility of implementing their mobile context-aware learning schedule (mCALS) framework as a software application on a mobile device using current technologies, prior to its actual implementation. This process draws a set of compatible mobile and context-aware technologies at present and can be…

  13. 77 FR 56743 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Regulation; Technical Amendments AGENCY: Department of Defense (DoD), General Services Administration (GSA... publication schedules. Please cite FAC 2005-61, Technical Amendments. SUPPLEMENTARY INFORMATION: In order to...

  14. 78 FR 6191 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... Regulation; Technical Amendments AGENCY: Department of Defense (DoD), General Services Administration (GSA... publication schedules. Please cite FAC 2005-65, Technical Amendments. SUPPLEMENTARY INFORMATION: In order to...

  15. Environmental Management Performance Report June 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities asmore » extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.« less

  16. X-ray satellite

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 3rd Quarter Status Report on DFVLR's ROSAT project confirms that with regard to technical performance and costs the project is on schedule. The valid schedule for engineering model and flight model completion on May 7, 1985 leads to a launch date on October 30, 1987. Progress in each department is compared to and explained with regard to the milestone plan. Continued problems with the gold damping of the FM-mirror system and contamination of the sterile rooms where the mirrors are stored have led to postponement of milestone 7. It is not yet completely clear to what extent all successive milestones will be affected by this factor.

  17. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  18. 77 FR 38699 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Change Relating to Technical and Conforming Amendments to the Pricing Schedule June 22, 2012. Pursuant to... amendments to the Pricing Schedule to format pricing the same throughout the Pricing Schedule, correct a... Proposed Rule Change 1. Purpose The Exchange proposes to make clarifying amendments to the Pricing Schedule...

  19. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less

  20. Systemic delay propagation in the US airport network

    PubMed Central

    Fleurquin, Pablo; Ramasco, José J.; Eguiluz, Victor M.

    2013-01-01

    Technologically driven transport systems are characterized by a networked structure connecting operation centers and by a dynamics ruled by pre-established schedules. Schedules impose serious constraints on the timing of the operations, condition the allocation of resources and define a baseline to assess system performance. Here we study the performance of an air transportation system in terms of delays. Technical, operational or meteorological issues affecting some flights give rise to primary delays. When operations continue, such delays can propagate, magnify and eventually involve a significant part of the network. We define metrics able to quantify the level of network congestion and introduce a model that reproduces the delay propagation patterns observed in the U.S. performance data. Our results indicate that there is a non-negligible risk of systemic instability even under normal operating conditions. We also identify passenger and crew connectivity as the most relevant internal factor contributing to delay spreading. PMID:23362459

  1. Space platform expendables resupply concept definition study. Volume 3: Work breakdown structure and work breakdown structure dictionary

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.

  2. Coastal Engineering Studies in Support of Virginia Beach, Virginia, Beach Erosion Control and Hurricane Protection Project. Report 1. Physical Model Tests of Irregular Wave Overtopping and Pressure Measurements.

    DTIC Science & Technology

    1988-03-01

    distribution Zb DECLASSIFICATION/OOWNGRADING SCHEDULE unlimited. 4 PERFORMING ORGANIZATION REPORT NUMBER(S) S MONITORING ORGANIZATION REPORT NUMBER(S...Technical Report CERC-88-1. 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION USAEWES, Coastal Engineering (if...FUNDING/SPONSORING 8b OFFICE SYMBOL 9 PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION US Army (If applicable) Engineer District, Norfolk Intra

  3. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  4. Compiler and Runtime Support for Programming in Adaptive Parallel Environments

    DTIC Science & Technology

    1998-10-15

    noother job is waiting for resources, and use a smaller number of processors when other jobs needresources. Setia et al. [15, 20] have shown that such...15] Vijay K. Naik, Sanjeev Setia , and Mark Squillante. Performance analysis of job scheduling policiesin parallel supercomputing environments. In...on networks ofheterogeneous workstations. Technical Report CSE-94-012, Oregon Graduate Institute of Scienceand Technology, 1994.[20] Sanjeev Setia

  5. United States Air Force Annual Financial Statements

    DTIC Science & Technology

    2002-01-01

    the Naval Postgraduate School and AFIT. While specific rec- ommendations are still in process, better cooperation, exchange of professors, and a common ...address schedule, technical, pro- grammatic, and performance risk; (3) the impact of capabilities-based requirements on system trade-off decisions; and (4...methodology to consider the impact of “aging” aircraft on the funding requirements . The model resulted in the identification and correct

  6. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

  7. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  8. An intensive combined training program modulates physical, physiological, biomotoric, and technical parameters in women basketball players.

    PubMed

    Kilinç, Fatih

    2008-11-01

    The purpose of this study was the investigation of the effects of an intensive combined training program based on the pretest scores of a university women's basketball team on their physical, physiological, biomotoric, and technical features. Twenty-four university volunteers were equally divided into two groups: an experiment group (intensive combined training group) and a control (technical training) group. The 10-week intensive combined training program was performed on the experiment group according to their pretest outcomes. Before and at the end of each period of training, which was scheduled four times a week, the physical, physiological, biomotoric, and technical performance of each subject were determined. With respect to the pre- and posttest measurements, the basketball group showed significant differences (p < 0.05) in girth measurements (shoulder, waist, hip, arm, thigh, and calf), in skinfold measurements (percent body fat), in physiological measurements (vital capacity and forced vital capacity), in biomotoric tests (right-left hand grip, dynamic and countermovement jump, sit-up, push-up, 1500-m endurance), and in technique tests (free and inside shooting). It can be concluded that a 10-week intensive combined training program performed on university women basketball players had a significant effect on improving their physical, physiological, biomotoric, and technical features. It proved to be highly recommendable for female basketball players who are preparing for short-term tournaments; the basketball group in this study won a championship.

  9. System engineering of the Atacama Large Millimeter/submillimeter Array

    NASA Astrophysics Data System (ADS)

    Bhatia, Ravinder; Marti, Javier; Sugimoto, Masahiro; Sramek, Richard; Miccolis, Maurizio; Morita, Koh-Ichiro; Arancibia, Demián.; Araya, Andrea; Asayama, Shin'ichiro; Barkats, Denis; Brito, Rodrigo; Brundage, William; Grammer, Wes; Haupt, Christoph; Kurlandczyk, Herve; Mizuno, Norikazu; Napier, Peter; Pizarro, Eduardo; Saini, Kamaljeet; Stahlman, Gretchen; Verzichelli, Gianluca; Whyborn, Nick; Yagoubov, Pavel

    2012-09-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) will be composed of 66 high precision antennae located at 5000 meters altitude in northern Chile. This paper will present the methodology, tools and processes adopted to system engineer a project of high technical complexity, by system engineering teams that are remotely located and from different cultures, and in accordance with a demanding schedule and within tight financial constraints. The technical and organizational complexity of ALMA requires a disciplined approach to the definition, implementation and verification of the ALMA requirements. During the development phase, System Engineering chairs all technical reviews and facilitates the resolution of technical conflicts. We have developed analysis tools to analyze the system performance, incorporating key parameters that contribute to the ultimate performance, and are modeled using best estimates and/or measured values obtained during test campaigns. Strict tracking and control of the technical budgets ensures that the different parts of the system can operate together as a whole within ALMA boundary conditions. System Engineering is responsible for acceptances of the thousands of hardware items delivered to Chile, and also supports the software acceptance process. In addition, System Engineering leads the troubleshooting efforts during testing phases of the construction project. Finally, the team is conducting System level verification and diagnostics activities to assess the overall performance of the observatory. This paper will also share lessons learned from these system engineering and verification approaches.

  10. TRAFFIC: An Information Retrieval System to Evaluate the Environmental Impacts of Commercial Navigation Traffic

    DTIC Science & Technology

    1990-12-01

    DECLASSIFICATIONIDOWNGRADING SCHEDULE Approved for public release; distribution unlimited. 4. PERFORMING ORGANIZATION REPORT NUMBER(S) S. MONITORING...Technical Paper 20, US Bureau of Sport Fisheries and Wildlife, Washington,_DC. 10 Helwig, P. C. 1969. An Experimental Study of Ship-generated Water Waves...1974. Stream Drift as a Chronobiological Phenomenon in Running Water Ecosystems, Annual Review of Ecology and Systematics, Vol 5, pp 309-323. Muncy, R

  11. Shuttle derived vehicle analysis solid booster unmanned launch vehicle concept definition study, volume 2

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The technical effort associated with the selection and definition of the recommended SRB-X concept is documented. Included are discussions concerning the trades leading to the selected concept, the analysis that established the concept's basic subsystem characteristics, selected configuration description and performance capabilities, launch site operations and facility needs, development schedule, cost characteristics, risk assessment, and a cursory comparison with other launch systems.

  12. Using Queue Time Predictions for Processor Allocation

    DTIC Science & Technology

    1997-01-01

    Diego Supercomputer Center, 1996. 19 [15] Vijay K. Naik, Sanjeev K. Setia , and Mark S. Squillante. Performance analysis of job schedul- ing policies in...Processing, pages 101{111, 1995. [19] Sanjeev K. Setia and Satish K. Tripathi. An analysis of several processor partitioning policies for parallel...computers. Technical Report CS-TR-2684, University of Maryland, May 1991. [20] Sanjeev K. Setia and Satish K. Tripathi. A comparative analysis of static

  13. Individualized deliberate practice on a virtual reality simulator improves technical performance of surgical novices in the operating room: a randomized controlled trial.

    PubMed

    Palter, Vanessa N; Grantcharov, Teodor P

    2014-03-01

    The purpose of this study was to investigate whether individualized deliberate practice on a virtual reality (VR) simulator results in improved technical performance in the operating room. Training on VR simulators has been shown to improve technical performance in the operating room (OR). Currently described VR curricula consist of trainees practicing the same tasks until expert proficiency is reached. It has yet to be investigated whether the individualized deliberate practice, where curricula tasks vary depending on prior levels of technical proficiency, would translate into the OR. This single-blinded prospective trial randomized 16 novice surgical residents to a deliberate practice (DP) group and a conventional residency training group. Both groups performed a laparoscopic cholecystectomy in the OR that was video-recorded. Technical performance of DP group residents in the OR was assessed using 3 validated assessment tools. A score of less than 60% on any component of the assessment tool resulted in the trainee practicing a specific task on the VR simulator. The DP group practiced on the simulator as per their individualized schedule. Both groups then performed another laparoscopic cholecystectomy. A blinded expert assessed the OR recordings using a validated global rating scale. Although both groups had similar technical abilities preintervention [DP: median score, 13.5 (9.3-15.0); control: median score, 14.5 (9.3-17.8); P = 0.45], the DP residents had a superior technical performance postintervention [DP: median score, 17.0 (15.3-18.5); control: median score, 12.5 (7.5-14.0); P = 0.03]. Of 8 DP residents, 6 practiced 5 basic VR tasks (median 1 trial to pass), and 7 of 8 practiced 2 advanced tasks (median 4 trials to pass). A curriculum of deliberate individualized practice on a VR simulator improves technical performance in the OR. This has implications to greatly improve the feasibility of implementing simulation-based curricula in residency training programs, rather then having them being limited to research protocols.

  14. The Basic Organizing/Optimizing Training Scheduler (BOOTS): User's Guide. Technical Report 151.

    ERIC Educational Resources Information Center

    Church, Richard L.; Keeler, F. Laurence

    This report provides the step-by-step instructions required for using the Navy's Basic Organizing/Optimizing Training Scheduler (BOOTS) system. BOOTS is a computerized tool designed to aid in the creation of master training schedules for each Navy recruit training command. The system is defined in terms of three major functions: (1) data file…

  15. 77 FR 74037 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ... the Pricing Schedule.\\4\\ The Exchange is also proposing a technical amendment to its Pricing Schedule. While changes to the Pricing Schedule pursuant to this proposal are effective upon filing, the Exchange... Listed Option becomes Multiply Listed, the option would be assessed the fees in Section II of the Pricing...

  16. A Comparison of Earned Value Management and Earned Schedule as Schedule Predictors on DoD ACAT I Programs

    DTIC Science & Technology

    2013-03-01

    33 Mario Vanhoucke and Stephan Vandevoorde – “Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predictors” (2007...technical problem to the present day ‘ super projects’” (Clark and Lorenzoni, 1997: 2). Cost engineering has “application regardless of industry...large construction projects, but also the acceptance of earned schedule principles on an international scale. Mario Vanhoucke and Stephan Vandevoorde

  17. A methodology for spacecraft technology insertion analysis balancing benefit, cost, and risk

    NASA Astrophysics Data System (ADS)

    Bearden, David Allen

    Emerging technologies are changing the way space missions are developed and implemented. Technology development programs are proceeding with the goal of enhancing spacecraft performance and reducing mass and cost. However, it is often the case that technology insertion assessment activities, in the interest of maximizing performance and/or mass reduction, do not consider synergistic system-level effects. Furthermore, even though technical risks are often identified as a large cost and schedule driver, many design processes ignore effects of cost and schedule uncertainty. This research is based on the hypothesis that technology selection is a problem of balancing interrelated (and potentially competing) objectives. Current spacecraft technology selection approaches are summarized, and a Methodology for Evaluating and Ranking Insertion of Technology (MERIT) that expands on these practices to attack otherwise unsolved problems is demonstrated. MERIT combines the modern techniques of technology maturity measures, parametric models, genetic algorithms, and risk assessment (cost and schedule) in a unique manner to resolve very difficult issues including: user-generated uncertainty, relationships between cost/schedule and complexity, and technology "portfolio" management. While the methodology is sufficiently generic that it may in theory be applied to a number of technology insertion problems, this research focuses on application to the specific case of small (<500 kg) satellite design. Small satellite missions are of particular interest because they are often developed under rigid programmatic (cost and schedule) constraints and are motivated to introduce advanced technologies into the design. MERIT is demonstrated for programs procured under varying conditions and constraints such as stringent performance goals, not-to-exceed costs, or hard schedule requirements. MERIT'S contributions to the engineering community are its: unique coupling of the aspects of performance, cost, and schedule; assessment of system level impacts of technology insertion; procedures for estimating uncertainties (risks) associated with advanced technology; and application of heuristics to facilitate informed system-level technology utilization decisions earlier in the conceptual design phase. MERIT extends the state of the art in technology insertion assessment selection practice and, if adopted, may aid designers in determining the configuration of complex systems that meet essential requirements in a timely, cost-effective manner.

  18. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  19. Computer Supported Education at Fox Valley Technical Institute. IBM Application Brief.

    ERIC Educational Resources Information Center

    International Business Machines Corp., White Plains, NY.

    Fox Valley Technical Institute (FVTI) has developed an approach to education which emphasizes competency-based, round-the-clock education entailing short terms, flexible class schedules, and individualized instruction and which has as its focus strong computer support at classroom, technical, and management levels. The college provides 6,000…

  20. Cure Schedule for Stycast 2651/Catalyst 9.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kropka, Jamie Michael; McCoy, John D.

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds amore » “post cure” to obtain full reaction.« less

  1. Intelligent Scheduling for Underground Mobile Mining Equipment.

    PubMed

    Song, Zhen; Schunnesson, Håkan; Rinne, Mikael; Sturgul, John

    2015-01-01

    Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.

  2. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  3. Photovoltaic system criteria documents. Volume 4: Review criteria for photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided for the organization, preparation and conduct of program reviews for photovoltaic applications. These criteria apply to all photovoltaic applications. They include, but are not limited to, the following: (1) Conceptual design review; (2) Preliminary design review; (3) Critical design review; and (4) Operational readiness review. Contract goal's and objectives are met through program monitoring for cost, schedule, and performance for both managerial and technical elements for all PV applications activities.

  4. Selected Research and Development Topics on Aerospace Communications at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Miranda, Felix A.; Romanofsky, Robert R.; Nessel, James A.

    2014-01-01

    This presentation discusses some of the efforts on communications RD that have been performed or are currently underway at NASA Glenn Research Center. The primary purpose of this presentation is to outline some RD topics to serve as talking points for a Technical Interchange Meeting with the Ohio State University. The meeting is scheduled to take place at The ElectroScience Laboratory of the Ohio State University on February 24, 2014.

  5. 76 FR 57681 - Modification of Interlibrary Loan Fee Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Agricultural Library. The revised fee schedule is based on the method of payment used (traditional invoicing through the National Technical Information Service (NTIS) or payment through the Online Computer Library... Branch, National Agricultural Library, 10301 Baltimore Avenue, Beltsville, MD 20705-2351. Telephone (301...

  6. The MAMMOTH project

    NASA Technical Reports Server (NTRS)

    Gerchar, Tim

    1994-01-01

    On the surface MAMMOTH is a high performance 5.25-inch half-high 8mm helical scan tape drive that records a native 20 Gigabytes of data on Advanced Metal Evaporated media at a sustained throughput of 3 Megabyte per second over a high speed SCSI interface, that is scheduled for production in the second half of 1995. But it's much more than that. Inside its custom designed sheet metal enclosure lies one of the greatest technical achievements of its kind. Exabyte's strategic direction is to increase throughput and capacity while continuing to improve drive, data and media reliability to its products. MAMMOTH adheres to that direction and the description of its technical advances is described in this paper. MAMMOTH can be broken down into four main functional assemblies: high-performance integrated digital electronics, high-reliability tape transport mechanism, high-performance scanner, and advanced metal evaporated media. All this technology is packaged into a standard 5.25-inch half-high form factor that dissipates only 15 watts.

  7. WFIRST: STScI Science Operations Center (SSOC) Activities and Plans

    NASA Astrophysics Data System (ADS)

    Gilbert, Karoline M.; STScI WFIRST Team

    2018-01-01

    The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.

  8. Chief of Naval Air Training Automated Management Information System (CAMIS). User’s Guide.

    DTIC Science & Technology

    1982-04-01

    display. This display allows the user to insert, update, delete , or analyze various data elements, or generate reports. The Flight Schedule Input...instructor, student, and aircraft utiliza- tion. Additionally, it provides a means to delete any erroneous sortie information previously entered. 5...appear: 10 Technical Report 121 VT-## FLIGHT SCHEDULE PROGRAM 1. ADD NEW FLIGHT SCHEDULE DATA 2. DELETE ERRONEOUS SORTIES PREVIOUSLY ENTERED KEY IN

  9. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 1B: Concise review

    NASA Technical Reports Server (NTRS)

    Miller, R. E., Jr.; Southall, J. W.; Kawaguchi, A. S.; Redhed, D. D.

    1973-01-01

    Reports on the design process, support of the design process, IPAD System design catalog of IPAD technical program elements, IPAD System development and operation, and IPAD benefits and impact are concisely reviewed. The approach used to define the design is described. Major activities performed during the product development cycle are identified. The computer system requirements necessary to support the design process are given as computational requirements of the host system, technical program elements and system features. The IPAD computer system design is presented as concepts, a functional description and an organizational diagram of its major components. The cost and schedules and a three phase plan for IPAD implementation are presented. The benefits and impact of IPAD technology are discussed.

  10. 76 FR 76713 - California Independent System Operator Corporation; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ...) proposal to eliminate convergence bidding at intertie scheduling points. Take notice that such conference...'s proposal to eliminate convergence bidding at intertie scheduling points. A subsequent notice... Act of 1973. For accessibility accommodations please send an email to [email protected] or call...

  11. 30 CFR 33.12 - Changes after certification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES... current recognition by a laboratory accrediting organization; (ii) Complete technical explanation of how... Subchapter D of this chapter (Bureau of Mines Schedule 2, revised, the current revision of which is Schedule...

  12. 30 CFR 33.12 - Changes after certification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES... current recognition by a laboratory accrediting organization; (ii) Complete technical explanation of how... Subchapter D of this chapter (Bureau of Mines Schedule 2, revised, the current revision of which is Schedule...

  13. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... is the responsibility of the Host Team Leader. (3) ITAR-controlled technology. ITAR-controlled technology shall not be divulged to the Inspection Team without U.S. Government authorization (such technology includes, but is not limited to technical data related to Schedule 1 chemicals or Schedule 2...

  14. 75 FR 13425 - Federal Acquisition Regulation; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Part 14 [FAC 2005-39; Item VII; Docket FAR 2010-0078; Sequence 1] Federal Acquisition... publication schedules. Please cite FAC 2005-39, Technical Amendment. SUPPLEMENTARY INFORMATION: This document...

  15. Integrating telehealth in to 'business as usual': Is it really possible?

    PubMed

    Jury, Susan C; Kornberg, Andrew J

    2016-12-01

    The Royal Children's Hospital, Melbourne, began offering web-based telehealth video consultation in 2011, with the principle being that telehealth should be integrated into 'business as usual'. In telehealth literature, key differences between telehealth and in-person consultations can make this hard to achieve, so an audit was performed that revealed many small gaps in the process.A total of 125 telehealth appointments were booked during the study period. Of these, 13% (n = 16) were rescheduled, cancelled or changed to face-to-face appointments, and up to two main issues were identified for the remaining appointments. Some 69% of the remaining 108 appointments (n = 75) were completed successfully, with 23% (n = 25) completely seamless end to end. Overall, 39 issues were administrative (40%), 34 technical (35%) and 24 scheduling (25%); nine (8%) required some minor troubleshooting.For long-term sustainability, integrating telehealth into business as usual needs to remain the target. Scheduling and technical glitches were the main barriers to seamless telehealth. Several issues have now been addressed with the introduction of an electronic medical record, and the development of standardised processes and staff training. © The Author(s) 2016.

  16. Report of the Cost Assessment and Validation Task Force on the International Space Station

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

  17. Cost Assessment and Validation Task Force on the International Space Station

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

  18. Space station systems analysis study. Part 3: Documentation. Volume 4: Supporting research and technology report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A brief description of recommended supporting research and technology items resulting from the space station analysis study is provided. Descriptions include the title; the status with respect to the state of the art; the justification; the technical plan including objectives and technical approach; resource requirements categorized by manpower, specialized facilities, and funding in 1977 dollars; and also the target schedule. The goal is to provide high confidence in the solutions for the various functional system development problems, and to do so within a time period compatible with the overall evolutionary space construction base schedule.

  19. Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments

    NASA Astrophysics Data System (ADS)

    Holloman, Sherrica S.

    With pressure on the U.S. Defense Acquisition System (DAS) to reduce cost overruns and schedule delays, system engineers' performance is only as good as their tools. Recent literature details a need for 1) objective, analytical risk quantification methodologies over traditional subjective qualitative methods -- such as, expert judgment, and 2) mathematically rigorous system-level maturity assessments. The Mahafza, Componation, and Tippett (2005) Technology Performance Risk Index (TPRI) ties the assessment of technical performance to the quantification of risk of unmet performance; however, it is structured for component- level data as input. This study's aim is to establish a modified TPRI with systems-level data as model input, and then validate the modified index with actual system-level data from the Department of Defense's (DoD) Major Defense Acquisition Programs (MDAPs). This work's contribution is the establishment and validation of the System-level Performance Risk Index (SPRI). With the introduction of the SPRI, system-level metrics are better aligned, allowing for better assessment, tradeoff and balance of time, performance and cost constraints. This will allow system engineers and program managers to ultimately make better-informed system-level technical decisions throughout the development phase.

  20. 77 FR 68891 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Area ICD International Classification of Diseases IMRT Intensity Modulated Radiation Therapy IOM... Stereotactic body radiation therapy SGR Sustainable growth rate TC Technical component TIN Tax identification... Clinical Lab Fee Schedule, which is unaffected by the misvalued code initiative. Radiation therapy centers...

  1. Assessment of need and feasibility of truck-mounted changeable message signs (CMS) for scheduled and unscheduled operations : technical report.

    DOT National Transportation Integrated Search

    2010-10-01

    The goal of this project was to develop implementation guidance that the Texas Department of Transportation : (TxDOT) can use to make better decisions regarding the use of truck mounted changeable message signs : (TMCMS) during scheduled and unschedu...

  2. A Technical Survey on Optimization of Processing Geo Distributed Data

    NASA Astrophysics Data System (ADS)

    Naga Malleswari, T. Y. J.; Ushasukhanya, S.; Nithyakalyani, A.; Girija, S.

    2018-04-01

    With growing cloud services and technology, there is growth in some geographically distributed data centers to store large amounts of data. Analysis of geo-distributed data is required in various services for data processing, storage of essential information, etc., processing this geo-distributed data and performing analytics on this data is a challenging task. The distributed data processing is accompanied by issues in storage, computation and communication. The key issues to be dealt with are time efficiency, cost minimization, utility maximization. This paper describes various optimization methods like end-to-end multiphase, G-MR, etc., using the techniques like Map-Reduce, CDS (Community Detection based Scheduling), ROUT, Workload-Aware Scheduling, SAGE, AMP (Ant Colony Optimization) to handle these issues. In this paper various optimization methods and techniques used are analyzed. It has been observed that end-to end multiphase achieves time efficiency; Cost minimization concentrates to achieve Quality of Service, Computation and reduction of Communication cost. SAGE achieves performance improvisation in processing geo-distributed data sets.

  3. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  4. Discovering system requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bahill, A.T.; Bentz, B.; Dean, F.F.

    1996-07-01

    Cost and schedule overruns are often caused by poor requirements that are produced by people who do not understand the requirements process. This report provides a high-level overview of the system requirements process, explaining types, sources, and characteristics of good requirements. System requirements, however, are seldom stated by the customer. Therefore, this report shows ways to help you work with your customer to discover the system requirements. It also explains terminology commonly used in the requirements development field, such as verification, validation, technical performance measures, and the various design reviews.

  5. Design definition study of NASA/Navy lift/cruise fan V/STOL aircraft

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Assessed are the risks associated with the lift/cruise fan technology V/STOL aircraft program. Three candidate concepts for the technology aircraft design approach are considered: the lowspeed only modification, the full performance modification, and the all new aircraft concepts. Survey results indicate that the lift/cruise fan technology aircraft program is feasible, from the standpoint of technical risk, with some evidence of uncertainty of meeting the planned schedule and relatively minor impact on estimated program costs.

  6. KC-46 Tanker Modernization: Delivery of First Fully Capable Aircraft Has Been Delayed over One Year and Additional Delays Are Possible

    DTIC Science & Technology

    2017-03-01

    delays. As shown, the remaining schedule was modified to allow Boeing to deliver the first 18 aircraft and pods separately by October 2018, 14...testing. Among other things, Boeing is contractually required to deliver a total of 18 aircraft and 9 wing air refueling pod sets by August 2017...Parameters and System Attributes and Status of Technical Performance Capabilities 18 Appendix II GAO Contact and Staff Acknowledgments 20 Related

  7. 77 FR 12948 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Parts 19, 42, and 52 [FAC 2005-56; Item VIII; Docket 2012-0079; Sequence 1] Federal... to status or publication schedules. Please cite FAC 2005-56, Technical Amendments. SUPPLEMENTARY...

  8. Proceedings of the Annual ONR/CADRC Decision-Support Workshop (6th), Held in Quantico, Virginia, on 8-9 Sep 2004. Interoperability

    DTIC Science & Technology

    2004-11-01

    fixed schedule checkups and overhauls), Underway Replenishment (the goal being operation in sea states 3 and higher via technical improvements to...determine whether sufficient local resources are available to deal with current conditions. Scheduling Agent: Assists the Emergency Operations Bureau to...will commence per predefined schedule within 15 minutes) and subsequently alerts its subscribers that the rolling power blackout has commenced. The

  9. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  10. Operations mission planner

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric; Cooper, Lynne

    1990-01-01

    The findings are documented of the OMP research task, which investigated the applicability of artificial intelligence (AI) technology in support of automated scheduling. The goals of the effort are summarized and the technical accomplishments are highlighted. The OMP task succeeded in identifying how AI technology could be applied and demonstrated an AI-based automated scheduling approach through the OMP prototypes.

  11. Kodak AMSD Concept Overview and Status (Semi-Rigid Mirror with Sparse Actuators)

    NASA Technical Reports Server (NTRS)

    Matthews, Gary; Maji, Arup K. (Technical Monitor)

    2001-01-01

    This talk will review Kodak's current AMSD technical and schedule status. For AMSD, Kodak is fabricating a semi-rigid closed-back egg-crate glass mirror, a graphite composite reaction structure, and 16 force actuators for figure control. The mirror is currently on schedule for cryotesting in early '02.

  12. Active Rack Isolation System Program and Technical Status

    NASA Technical Reports Server (NTRS)

    Bushnell, Glenn; Fialho, Ian; Allen, James; Quraishi, Naveed

    2000-01-01

    The Boeing Active Rack Isolation System (ARIS) is one of the means used to isolate acceleration-sensitive scientific experiments from structurally transmitted disturbances aboard the International Space Station. The presentation provides an overview of ARIS and technical issues associated with the development of the active control system. An overview of ARIS analytical models is presented along with recent isolation performance predictions made using these models. Issues associated with commanding and capturing ARIS data are discussed and possible future options based on the ARIS ISS Characterization Experiment (ICE) Payload On-orbit Processor (POP) are outlined. An overview of the ARIS-ICE experiment scheduled to fly on ISS Flight 6A is presented. The presentation concludes with a discussion of recent- developmental work that includes passive rack damping, umbilical redesigns and advanced multivariable control design methods.

  13. Influence of the revision of surgical fee schedule on surgeons' productivity in Japan: A cohort analysis of 7602 surgical procedures in 2013-2016.

    PubMed

    Nakata, Yoshinori; Watanabe, Yuichi; Narimatsu, Hiroto; Yoshimura, Tatsuya; Otake, Hiroshi; Sawa, Tomohiro

    2018-02-01

    The goal of this study is to evaluate the pure impact of the revision of surgical fee schedule on surgeons' productivity. We collected data from the surgical procedures performed by the surgeons working in Teikyo University Hospital from 1 April through 30 September in 2013-2016. We employed non-radial and non-oriented Malmquist model. We defined the decision-making unit as a surgeon with the highest academic rank in surgery. Inputs were defined as (1) the number of doctors who assisted surgery and (2) the time of surgical operation. The output was defined as the surgical fee for each surgery. We focused on the revisions in 2014 and 2016. We first calculated each surgeon's natural logarithms of the changes in productivity, technique and efficiency in 2013-2014, in 2014-2015 and in 2015-2016. Then, we subtracted the changes in 2014-2015 from the changes in 2013-2014 and in 2015-2016. We analyzed 62 surgeons who performed 7602 surgical procedures. The productivity changes were not significantly different from 0. Their efficiency change was significantly greater than 0, while their technical change was smaller than 0 in revision 2014. Their efficiency change was significantly smaller than 0, while their technical change was greater than 0 in revision 2016 (p < 0.05). This finding suggests that we could increase overall productivity through revision if we could increase both efficiency and technique.

  14. Managing Risks and Beyond

    DTIC Science & Technology

    2010-04-01

    immediate, a trigger should be defined  • Examples of triggers may include:        – Cost performance – Schedule performance R lt f t i– esu s o   managemen ...nput  nto  t e system  y e t er  t e a.   operator , or b.  technical user MITRE Al Florence 117 Example 6  • Initial specification: 3.3.2.1 The system...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware

  15. Heritage Systems Engineering Lessons from NASA Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon

    2010-01-01

    In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for all five missions studied. The cost and schedule growth was not found to be the result of technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the systemwide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study s lessons learned in more detail and offers suggestions for improving the project s ability to identify and manage the technology and heritage risks inherent in the design solution.

  16. Heritage and Advanced Technology Systems Engineering Lessons Learned from NASA Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon

    2010-01-01

    In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for four of the five missions studied. The cost and schedule growth was not found to result from technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study's lessons learned in more detail and offers suggestions for improving the project's ability to identify and manage the technology and heritage risks inherent in the design solution.

  17. Intelligent Scheduling for Underground Mobile Mining Equipment

    PubMed Central

    Song, Zhen; Schunnesson, Håkan; Rinne, Mikael; Sturgul, John

    2015-01-01

    Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment) is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine. PMID:26098934

  18. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  19. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  20. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  1. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  2. 48 CFR 227.7103-2 - Acquisition of technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Identify the type and quantity of the technical data to be delivered under the contract and the format and...-price type contract; (4) Include delivery schedules and acceptance criteria for each deliverable data... data. 227.7103-2 Section 227.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...

  3. 76 FR 31416 - Federal Acquisition Regulation; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... ADMINISTRATION 48 CFR Parts 52 and 53 [FAC 2005-52; Item VI; Docket 2011-0078; Sequence 2] Federal Acquisition... publication schedules. Please cite FAC 2005-52, Technical Amendments. SUPPLEMENTARY INFORMATION: In order to update certain elements in 48 CFR parts 52 and 53, this document makes editorial changes to the Federal...

  4. 77 FR 47047 - Biomass Research and Development Technical Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... research and development leading to the production of biobased fuels and biobased products. Tentative... Research and Development Technical Advisory Committee. To attend the meeting and/or to make oral statements... at the beginning of the meeting. Reasonable provision will be made to include the scheduled oral...

  5. OTEC modular experiment cold water pipe concept evaluation. Volume III. Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-04-01

    The Cold Water Pipe System Design Study was undertaken to evaluate the diverse CWP concepts, recommend the most viable alternatives for a 1984 deployment of the 10 to 40 MWe MEP, and carry out preliminary designs of three concepts. The concept evaluation phase reported involved a systems analysis of design alternatives in the broad categories of rigid walled (with hinges), compliant walled, stockade and bottom mounted buoyant. Quantitative evaluations were made of concept performance, availability, deployment schedule, technical feasibility and cost. CWP concepts were analyzed to determine if they met or could be made to meet established system requirements andmore » could be deployed by 1984. Fabrication, construction and installation plans were developed for successful concepts, and costs were determined in a WBS format. Evaluations were performed on the basis of technical and cost risk. This volume includes the following appendices: (A) materials and associated design criteria; (B) summary of results of dynamic flow and transportation analysis; (C) CWP sizing analysis; (D) CWP thermal performance; and (E) investigation of the APL/ABAM CWP design. (WHK)« less

  6. 7. PHOTOCOPY OF DRAWING (UNDATED PLAN AND SCHEDULE DRAWING BY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PHOTOCOPY OF DRAWING (UNDATED PLAN AND SCHEDULE DRAWING BY THE DEPARTMENT OF THE AIR FORCE, SPACE AND MISSILE TEST CENTER) MATERIAL SPECIFICATIONS AND GENERAL NOTES FOR INTERIOR FINISHING FOR BUILDING 762-A, SHEET A4 - Vandenberg Air Force Base, Space Launch Complex 3, Technical Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 78 FR 11179 - Auction of Lower and Upper Paging Bands Licenses Scheduled for July 16, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... investigating and evaluating all technical and marketplace factors that may have a bearing on the value of the... cooperate, collaborate, or communicate, including discussing bids, bidding strategies, or post-auction... schedule in order to foster an auction pace that reasonably balances speed with the bidders' need to study...

  8. Management of optics. [for HEAO-2 X ray telescope

    NASA Technical Reports Server (NTRS)

    Kirchner, T. E.; Russell, M.

    1981-01-01

    American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

  9. Pre-Launch Risk Reduction Activities Conducted at KSC for the International Space Station

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul

    2011-01-01

    In the development of any large scale space-based multi-piece assembly effort, planning must include provisions for testing and verification; not only of the individual pieces but also of the pieces together. Without such testing on the ground, the risk to cost, schedule and technical performance increases substantially. This paper will review the efforts undertaken by the International Space Station (ISS), including the International Partners, during the pre-launch phase, primarily at KSC, to reduce the risks associated with the on-orbit assembly and operation of the ISS.

  10. Synthesis of power plant outage schedules. Final technical report, April 1995-January 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, D.R.

    This document provides a report on the creation of domain theories in the power plant outage domain. These were developed in conjunction with the creation of a demonstration system of advanced scheduling technology for the outage problem. In 1994 personnel from Rome Laboratory (RL), Kaman Science (KS), Kestrel Institute, and the Electric Power Research Institute (EPRI) began a joint project to develop scheduling tools for power plant outage activities. This report describes our support for this joint effort. The project uses KIDS (Kestrel Interactive Development System) to generate schedulers from formal specifications of the power plant domain outage activities.

  11. Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach

    NASA Technical Reports Server (NTRS)

    Chien, S.; Gratch, J.

    1994-01-01

    One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.

  12. Translating PI observing proposals into ALMA observing scripts

    NASA Astrophysics Data System (ADS)

    Liszt, Harvey S.

    2014-08-01

    The ALMA telescope is a complex 66-antenna array working in the specialized domain of mm- and sub-mm aperture synthesis imaging. To make ALMA accessible to technically inexperienced but scientifically expert users, the ALMA Observing Tool (OT) has been developed. Using the OT, scientifically oriented user input is formatted as observing proposals that are packaged for peer-review and assessment of technical feasibility. If accepted, the proposal's scientifically oriented inputs are translated by the OT into scheduling blocks, which function as input to observing scripts for the telescope's online control system. Here I describe the processes and practices by which this translation from PI scientific goals to online control input and schedule block execution actually occurs.

  13. Transport and installation of the Dark Energy Survey CCD imager

    NASA Astrophysics Data System (ADS)

    Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken

    2012-09-01

    The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.

  14. Earned Value Management Considering Technical Readiness Level and Its Application to New Space Launcher Program

    NASA Astrophysics Data System (ADS)

    Choi, Young-In; Ahn, Jaemyung

    2018-04-01

    Earned value management (EVM) is a methodology for monitoring and controlling the performance of a project based on a comparison between planned and actual cost/schedule. This study proposes a concept of hybrid earned value management (H-EVM) that integrates the traditional EVM metrics with information on the technology readiness level. The proposed concept can reflect the progress of a project in a sensitive way and provides short-term perspective complementary to the traditional EVM metrics. A two-dimensional visualization on the cost/schedule status of a project reflecting both of the traditional EVM (long-term perspective) and the proposed H-EVM (short-term perspective) indices is introduced. A case study on the management of a new space launch vehicle development program is conducted to demonstrate the effectiveness of the proposed H-EVM concept, associated metrics, and the visualization technique.

  15. New Directions in Space: A Report on the Lunar and Mars Initiatives

    NASA Technical Reports Server (NTRS)

    Seitz, Frederick; Hawkins, Willis; Jastrow, Robert; Nierenberg, William A.

    1990-01-01

    This report focuses on one aspect of the current space program: The establishment of a manned base on the Moon and the manned exploration of Mars. These missions were announced by the President last year as a major U.S. space policy objective to be implemented under the leadership of the Vice President, acting as Chairman of the National Space Council. On March 8, 1990, the White House released Presidential guidelines for the execution of the lunar and Mars programs. The guidelines stressed the need for new approaches and the development of innovative technologies with a potential for major cost, schedule and performance improvements. They also called for a competitive environment, with several years allotted to the definition of at least two significantly different human space exploration "reference architectures." Selection of the final technical concepts for the mission is scheduled to occur only after the relative merits of the competing reference architectures have been evaluated.

  16. 32 CFR 518.21 - Collection of fees and fee rates for technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS THE FREEDOM OF INFORMATION ACT PROGRAM Fee Schedule..., blueprints, and other technical engineering documents 2.50 Engineering data (microfilm) a. Aperture cards... mm roll film, per frame .45 d. Paper prints (engineering drawings), each 1.50 e. Paper reprints of...

  17. A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  18. LBNL report of the vetting review of the GRETINA project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposalmore » received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas that may be incomplete for the current phase in the project and any area of significant risk for the project reaching its objectives. The committee was also asked to review and evaluate the technical status of the project and advise on any concerns or significant technical risks.« less

  19. SNAP 19 Viking Program. Bimonthly technical progress report, February 1980-March 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-01-01

    Viking 1 Lander power system data has not been available during this reporting period, but summary reports indicate no anomalies in performance. Monitoring and evaluation of Viking 2 Lander power system data continued. Temperature data were similar to those 23 months ago, but combined RTG output power was down by 7 watts from the 75 watts recorded in February of 1978. On February 7, 1980, during a scheduled relay transmission the Lander 2 battery voltage dropped below 26.5 volts. With the orbiter attitude control gas supply nearly depleted and the space network stations required for Voyager encounter with Saturn latermore » this year, the final relay from Viking Lander 2 had been scheduled to take place on April 11. The attempt was made but no data were received. Power system performance data for Pioneer 10 and Pioneer Saturn (initially designated Pioneer 11) were monitored. The estimated RTG system net power was 115 watts for both, Pioneer 10 and Pioneer Saturn. The telemetry signal quality from Pioneer Saturn remains excellent. Pioneer 10, for the first time, shows a loss of signal strength.« less

  20. Ares I-X Roll Control System Development

    NASA Technical Reports Server (NTRS)

    Unger, Ronald J.; Massey, Edmund C.

    2009-01-01

    Project Managers often face challenging technical, schedule and budget issues. This presentation will explore how the Ares I-X Roll Control System Integrated Product Team (IPT) mitigated challenges such as concurrent engineering requirements and environments and evolving program processes, while successfully managing an aggressive project schedule and tight budget. IPT challenges also included communications and negotiations among inter- and intra-government agencies, including the US Air Force, NASA/MSFC Propulsion Engineering, LaRC, GRC, KSC, WSTF, and the Constellation Program. In order to successfully meet these challenges it was essential that the IPT define those items that most affected the schedule critical path, define early mitigation strategies to reduce technical, schedule, and budget risks, and maintain the end-product focus of an "unmanned test flight" context for the flight hardware. The makeup of the IPT and how it would function were also important considerations. The IPT consisted of NASA/MSFC (project management, engineering, and safety/quality) and contractors (Teledyne Brown Engineering and Pratt and Whitney Rocketdyne, who supplied heritage hardware experience). The early decision to have a small focused IPT working "badgelessly" across functional lines to eliminate functional stove-piping allowed for many more tasks to be done by fewer people. It also enhanced a sense of ownership of the products, while still being able to revert back to traditional roles in order to provide the required technical independence in design reviews and verification closures. This presentation will highlight several prominent issues and discuss how they were mitigated and the resulting Lessons Learned that might benefit other projects.

  1. Space Fence PDR Concept Development Phase

    NASA Astrophysics Data System (ADS)

    Haines, L.; Phu, P.

    2011-09-01

    The Space Fence, a major Air Force acquisition program, will become the dominant low-earth orbit uncued sensor in the space surveillance network (SSN). Its primary objective is to provide a 24/7 un-cued capability to find, fix, and track small objects in low earth orbit to include emerging and evolving threats, as well as the rapidly growing population of orbital debris. Composed of up to two geographically dispersed large-scale S-band phased array radars, this new system-of-systems concept will provide comprehensive Space Situational Awareness through net-centric operations and integrated decision support. Additionally, this program will facilitate cost saving force structure changes in the SSN, specifically including the decommissioning of very-high frequency VHF Air Force Space Surveillance System (AFSSS). The Space Fence Program Office entered a Preliminary Design Review (PDR) concept development phase in January 2011 to achieve the delivery of the Initial Operational Capability (IOC) expected in FY17. Two contractors were awarded to perform preliminary system design, conduct radar performance analyses and evaluations, and develop a functional PDR radar system prototype. The key objectives for the Phase A PDR effort are to reduce Space Fence total program technical, cost, schedule, and performance risk. The overall program objective is to achieve a preliminary design that demonstrates sufficient technical and manufacturing maturity and that represents a low risk, affordable approach to meet the Space Fence Technical Requirements Document (TRD) requirements for the final development and production phase to begin in 3QFY12. This paper provides an overview of the revised Space Fence program acquisition strategy for the Phase-A PDR phase to IOC, the overall program milestones and major technical efforts. In addition, the key system trade studies and modeling/simulation efforts undertaken during the System Design Requirement (SDR) phase to address and mitigate technical challenges of the Space Fence System will also be discussed. Examples include radar system optimization studies, modeling and simulation for system performance assessment, investigation of innovative Astrodynamics algorithms for initial orbit determination and observation correlation.

  2. Man in the North Technical Paper. Education in the Canadian North, Report Two: Apprentice Teachers.

    ERIC Educational Resources Information Center

    Brown, Doug; And Others

    The objective of this applied research project was to evaluate a formula by which young native Canadians would become teachers through in-service training coupled with academic upgrading. The experiment design paired apprentice and cooperating teachers, provided technical help, planned a schedule of activities for the apprentice, and assessed the…

  3. 76 FR 78062 - Self-Regulatory Organizations; NYSE Amex LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... problem and make other technical changes. The proposed change will be operative on December 1, 2011. The... experiences a bona fide systems problem and make other technical changes. The Exchange presently has three... Exchange experienced a bona fide systems problem. The Exchange proposes to amend the Fee Schedule to extend...

  4. 2005 8th Annual Systems Engineering Conference. Volume 2, Wednesday Presentations

    DTIC Science & Technology

    2005-10-27

    Acquisition Programs: An OSD Perspective, Col Warren Anderson, OUSD (AT&L) Defense Systems Implementation of Policy Requiring Systems Engineering Plans...Technical Excellence, Col Warren Anderson, OUSD (AT&L) Defense Systems Applying CMMI to System Safety, Mr. Tom Pfitzer, APT Research, Inc. System...to following pages for Tutorials Schedule) Buffett Lunch Tutorial Tracks (Please refer to following pages for Tutorials Schedule) Reception in

  5. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  6. A technique for lowering risks during contract negotiations

    NASA Technical Reports Server (NTRS)

    Lehman, D. H.

    1986-01-01

    In this day and age of sophisticated weapon and space system procurements, negotiations of the statement of work, technical requirements, and schedule may be as protracted as the negotiation of costs and profit. A major problem facing the program manager during contract negotiations is what affect changes in schedule, technical requirements, and contract terms have on the price. In many instances, after the statement of work has been redrafted, the contractor will be obliged to reprice the work, either on the spot or after a short recess in the negotiations. In this paper, a method for organizing the negotiation process is presented to reduce the risks incurred by the seller. The method is built upon regression analysis and two illustrative examples of its use are provided.

  7. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  8. Tank Riser Pit Decontamination System (Pit Viper) Return on Investment and Break-Even Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Joan K.; Weimar, Mark R.; Balducci, Patrick J.

    2003-06-30

    This study assessed the cost benefit of Pit Viper deployment for 80 tank farm pits between October 1, 2003 and September 30, 2012 under the technical baseline for applicable double-shell tank (DST) and single-shell tank (SST) projects. After this assessment had been completed, the U.S. Department of Energy (DOE) Richland Operations Office (RL) and Office of River Protection (ORP) published the Hanford Performance Management Plan (August 2003), which accelerated the schedule for SST retrieval. Then, DOE/CH2M HILL contract modification M064 (October 2002) and The Integrated Mission Acceleration Plan (March 2003) further accelerated SST retrieval and closure schedules. Twenty-six to 40more » tanks must be retrieved by 2006. Thus the schedule for SST pit entries is accelerated and the number of SST pit entries is increased. This study estimates the return on investment (ROI) and the number of pits where Pit Viper deployment would break even or save money over current manual practices. The results of the analysis indicate a positive return on the federal investment for deployment of the Pit Viper provided it is used on a sufficient number of pits.« less

  9. The role of the production scheduling system in rescheduling

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  10. The future of space imaging. Report of a community-based study of an advanced camera for the Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Brown, Robert A. (Editor)

    1993-01-01

    The scientific and technical basis for an Advanced Camera (AC) for the Hubble Space Telescope (HST) is discussed. In March 1992, the NASA Program Scientist for HST invited the Space Telescope Science Institute to conduct a community-based study of an AC, which would be installed on a scheduled HST servicing mission in 1999. The study had three phases: a broad community survey of views on candidate science program and required performance of the AC, an analysis of technical issues relating to its implementation, and a panel of experts to formulate conclusions and prioritize recommendations. From the assessment of the imaging tasks astronomers have proposed for or desired from HST, we believe the most valuable 1999 instrument would be a camera with both near ultraviolet/optical (NUVO) and far ultraviolet (FUV) sensitivity, and with both wide field and high resolution options.

  11. 76 FR 60931 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ..., fact sheets, slogans, posters, publications, videos, and public service announcements. 2. Department of... publications, directives, technical advisories, photographs, posters, motion pictures, video, and sound...

  12. X-ray satellite (ROSAT)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.

  13. ALPHA SMP SYSTEM(S) Final Report CRADA No. TC-1404-97

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seager, M.; Beaudet, T.

    Within the scope of this subcontract, Digital Equipment Corporation (DIGITAL) and the University, through the Lawrence Livermore National Laboratory (LLNL), engaged in joint research and development activities of mutual interest and benefit. The primary objectives of these activities were, for LLNL to improve its capability to perform its mission, and for DIGITAL to develop technical capability complimentary to this mission. The collaborative activities had direct manpower investments by DIGITAL and LLNL. The project was divided into four areas of concern, which were handled concurrently. These areas included Gang Scheduling, Numerical Methods, Applications Development and Code Development Tools.

  14. SXI Prototype mirror mount

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This final report describes the work performed from June 1993 to January 1995. The purpose of this contract was to provide optomechanical engineering and fabrication support to the Solar X-ray Imager (SXI) program in the areas of mirror, optical bench and camera assemblies of the telescope. The Center for Applied Optics (CAO) worked closely with the Optics and S&E technical staff of MSFC to develop and investigate the most viable and economical options for the design and fabrication of a number of parts for the various telescope assemblies. All the tasks under this delivery order have been successfully completed within budget and schedule.

  15. Production of ELZM mirrors: performance coupled with attractive schedule, cost, and risk factors

    NASA Astrophysics Data System (ADS)

    Leys, Antoine; Hull, Tony; Westerhoff, Thomas

    2016-08-01

    Extreme light weighted ZERODUR Mirrors (ELZM) have been developed to exploit the superb thermal characteristics of ZERODUR. Coupled with up to date mechanical and optical fabrication methods this becomes an attractive technical approach. However the process of making mirror substrates has demonstrated to be unusually rapid and especially cost-effective. ELZM is aimed at the knee of the cost as a function of light weighting curve. ELZM mirrors are available at 88% light weighted. Together with their low risk, low cost production methods, this is presented as a strong option for NASA Explorer and Probe class missions.

  16. Modular space station phase B extension period executive summary

    NASA Technical Reports Server (NTRS)

    Tischler, A. A.; Could, C. L.

    1972-01-01

    A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

  17. Edwin I. Hatch nuclear plant implementation of improved technical specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahler, S.R.; Pendry, D.

    1994-12-31

    Edwin I. Hatch nuclear plant consists of two General Electric boiling water reactor/4 units, with a common control room and a common refueling floor. In March 1993, Hatch began conversion of both units` technical specifications utilizing NUREG 1433. The technical specifications amendment request was submitted February 25, 1994. Issuance is scheduled for October 21, 1994, with implementation on March 15, 1994. The current unit-1 technical specifications are in the {open_quotes}custom{close_quotes} format, and the unit-2 technical specifications are in the old standard format. Hatch previously relocated the fire protection and radiological technical specifications requirements. The Hatch conversion will provide consistency betweenmore » the two units, to the extent practicable.« less

  18. [Toward a New Immunization Schedule in Spain, 2016 (Part 1)].

    PubMed

    Limia-Sánchez, Aurora; Andreu, María Mar; Torres de Mier, María de Viarce; Navarro-Alonso, José Antonio

    2016-03-08

    The immunization Schedule is a dynamic public health tool that has incorporated different changes over the years influenced by the epidemiologic situation and the scientific evidence. The Immunization Advisory Committee [Ponencia de Programa y Registro de Vacunaciones], as the Interterritorial Council scientific and technical advisory body, carries out assessments of different programmes and vaccines and proposes changes that after approval will be introduced in the Regions schedule. This article is divided into two parts presenting the rationale followed to propose a new schedule for the immunization against diphtheria, tetanus, pertussis, hepatitis B and invasive disease by Haemophilus influenzae type b. This first part is focused in the reasoning to undertake the assessment, the review of the immunization policy and the impact of immunization in Spain, as well as a review of the immunization schedules in similar countries.

  19. 78 FR 48995 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...This document corrects technical errors that appeared in the final rule with comment period published in the Federal Register on November 16, 2012, entitled ``Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to-Face Encounters, Elimination of the Requirement for Termination of Non-Random Prepayment Complex Medical Review and Other Revisions to Part B for CY 2013.''

  20. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  1. Cost and schedule analytical techniques development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

  2. Concentrating solar collector subsystem: Preliminary design package

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Preliminary design data are presented for a concentrating solar collector including an attitude controller. Provided are schedules, technical status, all documents required for preliminary design, and other program activities.

  3. 76 FR 1669 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Areas Based on CBSA Labor Market Areas, we made technical and typographical errors in the composite rate... Based on CBSA Labor Market Areas, we made a technical error in the composite wage index for the nonurban... column, a. Second full paragraph, (1) Line 23, the figure ``1.181'' is corrected to read ``1.182.'' (2...

  4. Production Scheduling of Sequenced Tapes for Printed Circuit Pack Assembly.

    DTIC Science & Technology

    1987-07-09

    detail. L j 6 The subject matter of this thesis is inspired directly from their technical report. The goals of this research are twofold: 1) Test their...The subject matter of the following chapters describes a heuristic approach to another variation of the sequenced tape production scheduling problem...assignment problem, comprise the subject matter of Chapter 5. It is sufficient to note that the three definitions of the term common correspond to the

  5. Nuclear Waste: Defense Waste Processing Facility-Cost, Schedule, and Technical Issues.

    DTIC Science & Technology

    1992-06-17

    gallons of high-level radioactive waste stored in underground tanks at the savannah major facility involved Is the Defense Waste Processing Facility ( DwPF ...As a result of concerns about potential problems with the DWPF and delays in its scheduled start-up, the Chairman of the Environment, Energy, and...Natural Resources Subcommittee, House Committee on Government Operations, asked GAO to review the status of the DWPF and other facilities. This report

  6. Disparities in nuclear power plant performance in the United States and the Federal Republic of Germany

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, K.F.; Winje, D.K.

    This report presents data comparing the performance of light water reactors in the United States and the Federal Republic of Germany (FRG). The comparisons are made for the years 1980 to 1983 and include 21 Westinghouse Pressurized Water Reactors (PWRs), 22 General Electric Boiling Water Reactors (BWRs) in the US; and 6 Kraftwerk Union (KWU) PWRs and 4 KWU BWRs in the FRG. Data on capacity losses are presented in a disaggregated form for scheduled outages, forced outages, and regulatory imposed outages. Further, within the scheduled and forced outages, the data are subdivided into losses associated with the nuclear island,more » the balance of plant, or other causes. The report also surveys a number of observations relating to the causes of discrepancies between the US and West Germany. These observations were obtained from interviews with executives and engineers in both nations, including people from vendors, utilities, regulators, and architect/engineers. These discussions are distilled into observations relating to national differences in the broad areas of economics and economic regulation, safety regulations, and technical and managerial differences. 9 refs., 2 figs., 26 tabs.« less

  7. Lessons for surgeons in the final moments of Air France Flight 447.

    PubMed

    Bhangu, Aneel; Bhangu, Sonia; Stevenson, James; Bowley, Douglas M

    2013-06-01

    All surgeons make mistakes, and learning from critical incidents may help improve performance. The present study aimed to highlight lessons for surgeons from analysis of the final moments of Air France Flight 447. All of the authors work in teams and situations where safety, technical performance, and non-technical skills are critical. This review was born out of discussions regarding the events of Flight 447; specifically, whether the airline disaster was relevant to their work, and whether they could learn anything from it. The study is based on review of the crash reports of Flight 447, which lost flight speed indication after formation of ice prevented air from entering flight speed indicators during a storm. Following a subsequent stall, the aircraft fell at a rate of >10,000 feet/min until it crashed into the Atlantic Ocean, killing 228 passengers and crew. There were errors in decision making, reasoning, communication, and teamwork. Such non-technical skills failures have been recognized previously and can be addressed by existing non-technical skills training. A reliance on autopilot meant that the pilots were unfamiliar with high-altitude flying when the autopilot is disengaged. They were unprepared for and affected by such a sudden and serious problem; an event called "surprise and startle" by the accident investigation. The absence of the senior pilot (who was on a scheduled break) in the critical final minutes slowed error recognition and recovery. Unintended consequences of modern safety strategies may be under-recognized and can lead to adverse events. Both simulation-based and non-simulation-based training should include "surprise and startle" events beyond the scenarios trainees might expect. Likewise, in the face of increasing reliance on modern technology, surgeons should ensure that they would be able to perform procedures in the absence of such technologies. Specific training may improve surgeons' non-technical skills, and recognition of such skills could also be used to help select future surgeons.

  8. SeaWiFS technical report series. Volume 11: Analysis of selected orbit propagation models for the SeaWiFS mission

    NASA Technical Reports Server (NTRS)

    Patt, Frederick S.; Hoisington, Charles M.; Gregg, Watson W.; Coronado, Patrick L.; Hooker, Stanford B. (Editor); Firestone, Elaine R. (Editor); Indest, A. W. (Editor)

    1993-01-01

    An analysis of orbit propagation models was performed by the Mission Operations element of the Sea-viewing Wide Field-of-View Sensor (SeaWiFS) Project, which has overall responsibility for the instrument scheduling. The orbit propagators selected for this analysis are widely available general perturbations models. The analysis includes both absolute accuracy determination and comparisons of different versions of the models. The results show that all of the models tested meet accuracy requirements for scheduling and data acquisition purposes. For internal Project use the SGP4 propagator, developed by the North American Air Defense (NORAD) Command, has been selected. This model includes atmospheric drag effects and, therefore, provides better accuracy. For High Resolution Picture Transmission (HRPT) ground stations, which have less stringent accuracy requirements, the publicly available Brouwer-Lyddane models are recommended. The SeaWiFS Project will make available portable source code for a version of this model developed by the Data Capture Facility (DCF).

  9. Conceptual design study of a Harrier V/STOL research aircraft

    NASA Technical Reports Server (NTRS)

    Bode, W. E.; Berger, R. L.; Elmore, G. A.; Lacey, T. R.

    1978-01-01

    MCAIR recently completed a conceptual design study to define modification approaches to, and derive planning prices for the conversion of a two place Harrier to a V/STOL control, display and guidance research aircraft. Control concepts such as rate damping, attitude stabilization, velocity command, and cockpit controllers are to be demonstrated. Display formats will also be investigated, and landing, navigation and guidance systems flight tested. The rear cockpit is modified such that it can be quickly adapted to faithfully simulate the controls, displays and handling qualities of a Type A or Type B V/STOL. The safety pilot always has take command capability. The modifications studied fall into two categories: basic modifications and optional modifications. Technical descriptions of the basic modifications and of the optional modifications are presented. The modification plan and schedule as well as the test plan and schedule are presented. The failure mode and effects analysis, aircraft performance, aircraft weight, and aircraft support are discussed.

  10. Cure Schedule for Stycast 2651/Catalyst 11.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kropka, Jamie Michael; McCoy, John D.

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature formore » ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, T g, exceeding cure temperature).« less

  11. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  12. The effects of a split sleep-wake schedule on neurobehavioural performance and predictions of performance under conditions of forced desynchrony.

    PubMed

    Kosmadopoulos, Anastasi; Sargent, Charli; Darwent, David; Zhou, Xuan; Dawson, Drew; Roach, Gregory D

    2014-12-01

    Extended wakefulness, sleep loss, and circadian misalignment are factors associated with an increased accident risk in shiftwork. Splitting shifts into multiple shorter periods per day may mitigate these risks by alleviating prior wake. However, the effect of splitting the sleep-wake schedule on the homeostatic and circadian contributions to neurobehavioural performance and subjective assessments of one's ability to perform are not known. Twenty-nine male participants lived in a time isolation laboratory for 13 d, assigned to one of two 28-h forced desynchrony (FD) schedules. Depending on the assigned schedule, participants were provided the same total time in bed (TIB) each FD cycle, either consolidated into a single period (9.33 h TIB) or split into two equal halves (2 × 4.67 h TIB). Neurobehavioural performance was regularly assessed with a psychomotor vigilance task (PVT) and subjectively-assessed ability was measured with a prediction of performance on a visual analogue scale. Polysomnography was used to assess sleep, and core body temperature was recorded to assess circadian phase. On average, participants obtained the same amount of sleep in both schedules, but those in the split schedule obtained more slow wave sleep (SWS) on FD days. Mixed-effects ANOVAs indicated no overall difference between the standard and split schedules in neurobehavioural performance or predictions of performance. Main effects of circadian phase and prior wake were present for both schedules, such that performance and subjective ratings of ability were best around the circadian acrophase, worst around the nadir, and declined with increasing prior wake. There was a schedule by circadian phase interaction for all neurobehavioural performance metrics such that performance was better in the split schedule than the standard schedule around the nadir. There was no such interaction for predictions of performance. Performance during the standard schedule was significantly better than the split schedule at 2 h of prior wake, but declined at a steeper rate such that the schedules converged by 4.5-7 h of prior wake. Overall, the results indicate that when the total opportunity for sleep per day is satisfactory, a split sleep-wake schedule is not detrimental to sleep or performance. Indeed, though not reflected in subjective assessments of performance capacity, splitting the schedule may be of some benefit, given its reduction of neurobehavioural impairment at night and its association with increased SWS. Therefore, for some industries that require operations to be sustained around the clock, implementing a split work-rest schedule may be of assistance.

  13. To the systematization of failure analysis for perturbed systems (in German)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haller, U.

    1974-01-01

    The paper investigates the reliable functioning of complex technical systems. Of main importance is the question of how the functioning of technical systems which may fail or whose design still has some faults can be determined in the very earliest planning stages. The present paper is to develop a functioning schedule and to look for possible methods of systematic failure analysis of systems with stochastic failures. (RW/AK)

  14. American Chemical Society. 23rd Great Lakes Regional Meeting. Program and abstracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-01-01

    The technical program includes some 250 papers in 38 sessions, featuring 16 symposia with 99 invited speakers. Program highlights include a plenary lecture, The Origin and Consequences of Scientific Illiteracy, by Jon D. Miller. Sessions for general technical papers are scheduled in the following categories: analytical chemistry; biochemistry; inorganic chemistry; organic chemistry; and physical chemistry. Papers have been processed for inclusion on the data base.

  15. Louisiana ITS business plan : technical summary.

    DOT National Transportation Integrated Search

    2000-03-01

    The objectives are defined under: 1. Development of the plan, which identifies the preferred program of projects and policy initiatives and outlines the purpose, requirements, responsibilities, estimated cost, and implementation schedule for each pla...

  16. System Engineering and Integration Contract for Implementation of the National Airspace System Plan. Volume 1. Sections 1.0-4.0, 6.0.

    DTIC Science & Technology

    1984-08-01

    recommendations in the report with Martin Marietta over the next few months. Appropriate followup actions will be deter- mined, and any program changes...Technical Feasibility and Validity ...... . . .. 1-6 1.3.2 Program Schedule . . . . . . ......... . .. 1-7 1.3.3 NAS Plan Cost...343.1.1 Overview 3-1 3.1.2 Findings, Risks, and Recommendations . . . . . . . . . 3-3 3.2 Program Schedule . . . . . . . . . . * . . * . *. . 3-6

  17. Advancing Air Force Scheduling through Modeling Problem Topologies

    DTIC Science & Technology

    2006-08-03

    Merrill on August 23, 2005 and corresponded with Major David Van Veldhuizen in Fall 2005 about obtaining data. 3.4.3 Transitions Analytical Graphics and...observation satellite orbit. Technical Report CRT-2003-27, Centre de recherche sur les transports, July 2003. [5] Van -Dat Cung. ROADEF 2003: Results of the...collaborateurs/etd/default.htm. January, 2004. [15] P.J.M van Laarhoven, E.H.L. Aarts, and J.K. Lenstra. Job shop scheduling by simulated annealing

  18. Test development for the thermionic system evaluation test (TSET) project

    NASA Astrophysics Data System (ADS)

    Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.

    1992-01-01

    The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.

  19. Evaluation of commercially available aqueous batch immersion cleaning products. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bevilacqua, P.; Clark, K.G.

    1996-01-10

    With the production of Class I Ozone Depleting Substances scheduled to cease in January 1996, it has become necessary to identify suitable replacements for chlorofluorocarbon (CFC-113, Freon 113) vapor degreasing operations currently used to clean avionics components in Navy aircraft maintenance facilities. In this study, one potential option, the use of aqueous cleaning agents, was explored. Commercially available industrial aqueous cleaning agents were evaluated for cleaning capability on simulated operational soils and effects on aircraft materials. Two cleaning agents, Armakleen 2001 and Crest ABS 901, were recommended as a result of this work, and a Military Specification was drafted outliningmore » performance requirements.« less

  20. X-38 Bolt Retractor Subsystem Separation Demonstration

    NASA Technical Reports Server (NTRS)

    Rugless, Fedoria (Editor); Johnston, A. S.; Ahmed, R.; Garrison, J. C.; Gaines, J. L.; Waggoner, J. D.

    2002-01-01

    The Flight Robotics Laboratory FRL successfully demonstrated the X-38 bolt retractor subsystem (BRS). The BRS design was proven safe by testing in the Pyrotechnic Shock Facility (PSI) before being demonstrated in the FRL. This Technical Memorandum describes the BRS, FRL, PSF, and interface hardware. Bolt retraction time, spacecraft simulator acceleration, and a force analysis are also presented. The purpose of the demonstration was to show the FRL capability for spacecraft separation testing using pyrotechnics. Although a formal test was not performed due to schedule and budget constraints, the data will show that the BRS is a successful design concept and the FRL is suitable for future separation tests.

  1. Information management in an integrated space telerobot

    NASA Technical Reports Server (NTRS)

    Dipippo, S.; Pasquariello, G.; Labini, G. Sylos

    1989-01-01

    The in-orbit operations, like space structures inspection, servicing and repairing, is expected to be one of the most significant technological area for application and development of Robotics and Automation in Space Station environment. The Italian National Space Plan (PSN) has started up its strategic programme SPIDER (Space Inspection Device for Extravehicular Repairs), which is scheduled in three phases, with the final goal of performing docking and precision repairing in the Space Station environment. SPIDER system is an autonomous integrated space robot, using mature Artificial Intelligence tools and technics for its operational control. The preliminary results of a study on the information architecture of the spacecraft are described.

  2. Recommendations for an Executive Information System (EIS) for the NASA Accounting and Financial Information System (NAFIS)

    NASA Technical Reports Server (NTRS)

    Goss, Ernest Preston

    1991-01-01

    The objectives were to: (1) survey state-of-the-art computing architectures, tools, and technologies for implementing an Executive Information System (EIS); (2) review MSFC capabilities and efforts in developing an EIS for Shuttle Projects Office and the Payloads Project Office; (3) review management reporting requirements for the NASA Accounting and Financial Information System (NAFIS) Project in the areas of cost, schedule, and technical performance, and insure that the EIS fully supports these requirements; and (4) develop and implement a pilot concept for a NAFIS EIS. A summary of the findings of this work is presented.

  3. Work Breakdown Structure (WBS) and WBS dictionary. [advanced x ray astrophysics facility (AXAF)

    NASA Technical Reports Server (NTRS)

    Cocuzzo, F.

    1994-01-01

    This document is intended to provide the framework for defining all work to be accomplished under the proposed contract for the mission support program as defined by Section J-1 Statement of Work (SOW) of the RFP No.8-1-3-TA-50030 dated 11/2/93. The time period of performance of this contract will be from 3/1/94 through to the end of fiscal 1999. In addition to providing the framework for the integration of the cost, schedule, and manpower planning necessary to accomplish this work it establishes the association among the WBS elements, the SOW, and the Technical Proposal.

  4. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Germain, Shawn St.; Thomas, Kenneth; Farris, Ronald

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependentmore » activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.« less

  5. 1170 MW/sub t/ HTGR steamer cogeneration plant: design and cost study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    A conceptual design and cost study is presented for intermediate size high temperature gas-cooled reactor (HTGR) for industrial energy applications performed by United Engineers and Constructors Inc., (UE and C) and The General Atomic Company (GAC). The study is part of a program at ORNL and has the objective to provide support in the evaluation of the technical and economic feasibility of a single unit 1170 MW/sub t/ HTGR steam cycle cogeneration plant (referred to as the Steamer plant) for the production of industrial process energy. Inherent in the achievement of this objective, it was essential to perform a numbermore » of basic tasks such as the development of plant concept, capital cost estimate, project schedule and annual operation and maintenance (O and M) cost.« less

  6. Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

  7. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    NASA Technical Reports Server (NTRS)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  8. Evaluation of different time schedules in training with the Da Vinci simulator.

    PubMed

    Güldner, C; Orth, A; Dworschak, P; Diogo, I; Mandapathil, M; Teymoortash, A; Walliczek-Dworschak, U

    2017-10-01

    This prospective study analyzed the effect of different time schedules in training on the main performance outcomes: overall score, time to complete, and economy of motion. The study was performed on the da Vinci Skills Simulator from December 2014 to April 2016. Forty robotic novices were randomized into two groups of 20 participants, which trained in the same three exercises but with different intervals between their training sessions. Each group performed training in Peg Board 1 in their first week, Match Board 2 in their second week, and Ring and Rail 2 in their third week. On their last day, Needle Targeting and Energy Dissection 2, for which no previous training had been received, were performed. Regarding the different training intervals, group 1 trained each exercise six times in a row once a week. Group 2 performed their training once a day for 5 days. Technical performance parameters were recorded by the Mimics simulator software for further analysis. In addition, the participants were asked to fill out a questionnaire concerning the robotics training. Group 2 performed significantly better compared to group 1 in the main metrics in the more advanced exercises. For the easier exercises, the training frequency did not lead to significant differences in performance outcome. A significant skills gain was seen between the first and last training sessions for all exercises in both groups. Performance in the final exercise NT was significantly better in group 2 than group 1. Regarding ED 2, no difference was found between the two groups. As the training of group 2 led to significantly better outcomes, we suggest that, especially for advanced exercises, it seems to be more favorable to perform training every day for a short period than to train once a week six times in a row.

  9. Overviews of the Apollo Program and Its Management

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This special bibliography includes items individually selected by scientific and technical information professionals that provide an overview of the history, events, and results of the Apollo missions. Planning, scheduling, and management are also included.

  10. NASA Langley Systems Analysis & Concepts Directorate Technology Assessment/Portfolio Analysis

    NASA Technical Reports Server (NTRS)

    Cavanaugh, Stephen; Chytka, Trina; Arcara, Phil; Jones, Sharon; Stanley, Doug; Wilhite, Alan W.

    2006-01-01

    Systems analysis develops and documents candidate mission and architectures, associated system concepts, enabling capabilities and investment strategies to achieve NASA s strategic objectives. The technology assessment process connects the mission and architectures to the investment strategies. In order to successfully implement a technology assessment, there is a need to collect, manipulate, analyze, document, and disseminate technology-related information. Information must be collected and organized on the wide variety of potentially applicable technologies, including: previous research results, key technical parameters and characteristics, technology readiness levels, relationships to other technologies, costs, and potential barriers and risks. This information must be manipulated to facilitate planning and documentation. An assessment is included of the programmatic and technical risks associated with each technology task as well as potential risk mitigation plans. Risks are assessed and tracked in terms of likelihood of the risk occurring and consequences of the risk if it does occur. The risk assessments take into account cost, schedule, and technical risk dimensions. Assessment data must be simplified for presentation to decision makers. The Systems Analysis and Concepts Directorate (SACD) at NASA Langley Research Center has a wealth of experience in performing Technology Assessment and Portfolio Analysis as this has been a business line since 1978.

  11. Proceedings of Workshop on Expert Systems for Construction Scheduling Held in Champaign, Illinois on 23-24 March 1987.

    DTIC Science & Technology

    1987-08-01

    TO 8/87 68 6 CUPPEIFMyTARY 0A,()N Copies are available from,. the National Technical Information Service Springfield, VA 22161 *COSATI CODES 18 SUBJECT... information . The first exploratory research step was to determine the breath and depth of the construction schedule analysis domain. This step defined...ADDITIONAL INFORMATION REGARDING THIS RESEARCIH I. O’Connor, Michael J., Jesus M. Dc La Garza, and C. William Ibbs, "An Expert Systcm for Construction

  12. Lessons learned in control center technologies and non-technologies

    NASA Technical Reports Server (NTRS)

    Hansen, Elaine R.

    1991-01-01

    Information is given in viewgraph form on the Solar Mesosphere Explorer (SME) Control Center and the Oculometer and Automated Space Interface System (OASIS). Topics covered include SME mission operations functions; technical and non-technical features of the SME control center; general tasks and objects within the Space Station Freedom (SSF) ground system nodes; OASIS-Real Time for the control and monitoring of of space systems and subsystems; and OASIS planning, scheduling, and PC architecture.

  13. Annual Report, Fall 2016: Identifying Cost Effective Tank Waste Characterization Approaches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reboul, S. H.; DiPrete, D. P.

    2016-12-12

    This report documents the activities that were performed during the second year of a project undertaken to improve the cost effectiveness and timeliness of SRNL’s tank closure characterization practices. The activities performed during the first year of the project were previously reported in SRNL-STI-2015-00144. The scope of the second year activities was divided into the following three primary tasks: 1) develop a technical basis and strategy for improving the cost effectiveness and schedule of SRNL’s tank closure characterization program; 2) initiate the design and assembly of a new waste removal system for improving the throughput and reducing the personnel dosemore » associated with extraction chromatography radiochemical separations; and 3) develop and perform feasibility testing of three alternative radiochemical separation protocols holding promise for improving high resource demand/time consuming tank closure sample analysis methods.« less

  14. Thermoelectric Outer Planets Spacecraft (TOPS)

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The research and advanced development work is reported on a ballistic-mode, outer planet spacecraft using radioisotope thermoelectric generator (RTG) power. The Thermoelectric Outer Planet Spacecraft (TOPS) project was established to provide the advanced systems technology that would allow the realistic estimates of performance, cost, reliability, and scheduling that are required for an actual flight mission. A system design of the complete RTG-powered outer planet spacecraft was made; major technical innovations of certain hardware elements were designed, developed, and tested; and reliability and quality assurance concepts were developed for long-life requirements. At the conclusion of its active phase, the TOPS Project reached its principal objectives: a development and experience base was established for project definition, and for estimating cost, performance, and reliability; an understanding of system and subsystem capabilities for successful outer planets missions was achieved. The system design answered long-life requirements with massive redundancy, controlled by on-board analysis of spacecraft performance data.

  15. Quality Assurance Specifications for Planetary Protection Assays

    NASA Astrophysics Data System (ADS)

    Baker, Amy

    As the European Space Agency planetary protection (PP) activities move forward to support the ExoMars and other planetary missions, it will become necessary to increase staffing of labo-ratories that provide analyses for these programs. Standardization of procedures, a comprehen-sive quality assurance program, and unilateral training of personnel will be necessary to ensure that the planetary protection goals and schedules are met. The PP Quality Assurance/Quality Control (QAQC) program is designed to regulate and monitor procedures performed by labora-tory personnel to ensure that all work meets data quality objectives through the assembly and launch process. Because personnel time is at a premium and sampling schedules are often de-pendent on engineering schedules, it is necessary to have flexible staffing to support all sampling requirements. The most productive approach to having a competent and flexible work force is to establish well defined laboratory procedures and training programs that clearly address the needs of the program and the work force. The quality assurance specification for planetary protection assays has to ensure that labora-tories and associated personnel can demonstrate the competence to perform assays according to the applicable standard AD4. Detailed subjects included in the presentation are as follows: • field and laboratory control criteria • data reporting • personnel training requirements and certification • laboratory audit criteria. Based upon RD2 for primary and secondary validation and RD3 for data quality objectives, the QAQC will provide traceable quality assurance safeguards by providing structured laboratory requirements for guidelines and oversight including training and technical updates, standardized documentation, standardized QA/QC checks, data review and data archiving.

  16. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  17. An Assessment of the Technical Readiness of the Vapor Phase Catalytic Ammonia Removal Process (VPCAR) Technology

    NASA Technical Reports Server (NTRS)

    Flynn, Michael

    2000-01-01

    This poster provides an assessment of the technical readiness of the Vapor Phase Catalytic Ammonia Removal Process (VPCAR). The VPCAR technology is a fully regenerative water recycling technology designed specifically for applications such as a near term Mars exploration mission. The VPCAR technology is a highly integrated distillation/catalytic oxidation based water processor. It is designed to accept a combined wastewater stream (urine, condensate, and hygiene) and produces potable water in a single process step which requires -no regularly scheduled re-supply or maintenance for a 3 year mission. The technology is designed to be modular and to fit into a volume comparable to a single International Space Station Rack (when sized for a crew of 6). This poster provides a description of the VPCAR technology and a summary of the current performance of the technology. Also provided are the results of two separate NASA sponsored system trade studies which investigated the potential payback of further development of the VPCAR technology.

  18. 18 CFR 401.73 - Form of request.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...

  19. 18 CFR 401.73 - Form of request.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...

  20. 18 CFR 401.73 - Form of request.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...

  1. 18 CFR 401.73 - Form of request.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...

  2. Gas Turbine Engine Production Implementation Study : Volume 2. Technical Discussion.

    DOT National Transportation Integrated Search

    1973-07-01

    This report presents a summarization and assessment of available information pertaining to the potential for implementing mass production of gas turbine engine-powered automobiles. The main topic covered is the schedule requirement for that implement...

  3. 77 FR 55837 - Information Collection Being Reviewed by the Federal Communications Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ..., Satellite Network Stations and Space Stations. Form No.: FCC Form 312; Schedule S. Type of Review: Extension... determine the technical and legal qualifications of applicants or licensees to operate a station, transfer...

  4. Test and Evaluation for Enhanced Security: A Quantitative Method to Incorporate Expert Knowledge into Test Planning Decisions.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rizzo, Davinia; Blackburn, Mark

    Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper coversmore » the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).« less

  5. Standardization in software conversion of (ROM) estimating

    NASA Technical Reports Server (NTRS)

    Roat, G. H.

    1984-01-01

    Technical problems and their solutions comprise by far the majority of work involved in space simulation engineering. Fixed price contracts with schedule award fees are becoming more and more prevalent. Accurate estimation of these jobs is critical to maintain costs within limits and to predict realistic contract schedule dates. Computerized estimating may hold the answer to these new problems, though up to now computerized estimating has been complex, expensive, and geared to the business world, not to technical people. The objective of this effort was to provide a simple program on a desk top computer capable of providing a Rough Order of Magnitude (ROM) estimate in a short time. This program is not intended to provide a highly detailed breakdown of costs to a customer, but to provide a number which can be used as a rough estimate on short notice. With more debugging and fine tuning, a more detailed estimate can be made.

  6. Survey of the Patterns of Using Stereotactic Ablative Radiotherapy for Early-Stage Non-small Cell Lung Cancer in Korea.

    PubMed

    Song, Sanghyuk; Chang, Ji Hyun; Kim, Hak Jae; Kim, Yeon Sil; Kim, Jin Hee; Ahn, Yong Chan; Kim, Jae-Sung; Song, Si Yeol; Moon, Sung Ho; Cho, Moon June; Youn, Seon Min

    2017-07-01

    Stereotactic ablative radiotherapy (SABR) is an effective emerging technique for early-stage non-small cell lung cancer (NSCLC). We investigated the current practice of SABR for early-stage NSCLC in Korea. We conducted a nationwide survey of SABR for NSCLC by sending e-mails to all board-certified members of the Korean Society for Radiation Oncology. The survey included 23 questions focusing on the technical aspects of SABR and 18 questions seeking the participants' opinions on specific clinical scenarios in the use of SABR for early-stage NSCLC. Overall, 79 radiation oncologists at 61/85 specialist hospitals in Korea (71.8%) responded to the survey. SABR was used at 33 institutions (54%) to treat NSCLC. Regarding technical aspects, the most common planning methods were the rotational intensity-modulated technique (59%) and the static intensity-modulated technique (49%). Respiratory motion was managed by gating (54%) or abdominal compression (51%), and 86% of the planning scans were obtained using 4-dimensional computed tomography. In the clinical scenarios, the most commonly chosen fractionation schedule for peripherally located T1 NSCLC was 60 Gy in four fractions. For centrally located tumors and T2 NSCLC, the oncologists tended to avoid SABR for radiotherapy, and extended the fractionation schedule. The results of our survey indicated that SABR is increasingly being used to treat NSCLC in Korea. However, there were wide variations in the technical protocols and fractionation schedules of SABR for early-stage NSCLC among institutions. Standardization of SABR is necessary before implementing nationwide, multicenter, randomized studies.

  7. The economic context for the development of "blind flight".

    PubMed

    Temme, Leonard A; Rupert, Angus

    2003-07-01

    On 24 September 1929, at Mitchel Field, Long Island, NY, Jimmy Doolittle performed the first so-called "blind flight." He executed a flight plan and landed using only cockpit instruments, a feat that culminated a research program supported by the Daniel Guggenheim Fund for the Promotion of Aeronautics. Contemporary aviation medicine, with its understanding of the challenges of spatial (dis)orientation, has a special understanding and appreciation of the complex human performance, medical and technical problems that had to be overcome to make instrument flight possible. It is likely that the problems would not have been solved unless a socioeconomic context provoked a sufficient motivation to address them. This paper outlines some of the economic factors that motivated the research and development necessary for instrument flight. These factors were the direct consequence of the sudden, huge explosion of the aviation industry caused by World War I, and with the Armistice, the equally sudden loss of the industry's primary customer, the military. Finding a civilian role for aviation awaited the development of air mail, which, in turn, depended on the ability to fly according to a reliable schedule. The need to reliably adhere to a schedule forced the scientific and technological research needed to develop all-weather, blind flight.

  8. Operations research for resource planning and -use in radiotherapy: a literature review.

    PubMed

    Vieira, Bruno; Hans, Erwin W; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-11-25

    The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of advanced analytical models for improved decision making. This paper presents the state of the art in the application of OR methods for logistics optimization in RT, at various managerial levels. A literature search was performed in six databases covering several disciplines, from the medical to the technical field. Papers included in the review were published in peer-reviewed journals from 2000 to 2015. Data extraction includes the subject of research, the OR methods used in the study, the extent of implementation according to a six-stage model and the (potential) impact of the results in practice. From the 33 papers included in the review, 18 addressed problems related to patient scheduling (of which 12 focus on scheduling patients on linear accelerators), 8 focus on strategic decision making, 5 on resource capacity planning, and 2 on patient prioritization. Although calculating promising results, none of the papers reported a full implementation of the model with at least a thorough pre-post performance evaluation, indicating that, apart from possible reporting bias, implementation rates of OR models in RT are probably low. The literature on OR applications in RT covers a wide range of approaches from strategic capacity management to operational scheduling levels, and shows that considerable benefits in terms of both waiting times and resource utilization are likely to be achieved. Various fields can be further developed, for instance optimizing the coordination between the available capacity of different imaging devices or developing scheduling models that consider the RT chain of operations as a whole rather than the treatment machines alone.

  9. B-70 Aircraft Study. Volume 4

    NASA Technical Reports Server (NTRS)

    Taube, L. J.

    1972-01-01

    This volume contains cost, schedule, and technical information on the following B-70 aircraft subsystems: air induction system, flight control, personnel accommodation and escape, alighting and arresting, mission and traffic control, flight indication, test instrumentation, and installation, checkout, and pre-flight.

  10. North Cascades Stehekin Valley Vehicle Decision Document.

    DOT National Transportation Integrated Search

    2007-08-31

    This document serves as technical substantiation in support of a procurement for a fleet of vehicles to be used to operate a scheduled shuttle operation with multiple stops at North Cascades National Park Service Complex (NOCA), in the Stehekin Valle...

  11. Scheduler-Conscious Synchronization.

    DTIC Science & Technology

    1994-12-01

    SPONSORING I MONITORING Office of Naval Research ARPA AGENCY REPORT NUMBER Information Systems 3701 N. Fairfax Drive TR 550 Arlington VA 22217 Arlington VA...Broughton. A New Approach to Exclusive Data Access in Shared Memory Multiprocessors. Technical Report UCRL -97663, Lawrence Livermore National Laboratory

  12. 40 CFR 66.13 - Duties of source owner or operator upon receipt of a notice of noncompliance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... schedule, as provided in the Technical Support Document and Instruction Manual, and transmit that... petition shall be deemed waived. (b) Any submittal pursuant to this subsection shall specify the identity...

  13. Prototype solar heating and hot water systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Progress made in the development of a solar hot water and space heating system is described in four quarterly reports. The program schedules, technical status and other program activities from 6 October 1976 through 30 September 1977 are provided.

  14. FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenison, LaVesta; Flanigan, Thomas; Hagerty, Gregg

    The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integratedmore » in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.« less

  15. Applying mathematical models to predict resident physician performance and alertness on traditional and novel work schedules.

    PubMed

    Klerman, Elizabeth B; Beckett, Scott A; Landrigan, Christopher P

    2016-09-13

    In 2011 the U.S. Accreditation Council for Graduate Medical Education began limiting first year resident physicians (interns) to shifts of ≤16 consecutive hours. Controversy persists regarding the effectiveness of this policy for reducing errors and accidents while promoting education and patient care. Using a mathematical model of the effects of circadian rhythms and length of time awake on objective performance and subjective alertness, we quantitatively compared predictions for traditional intern schedules to those that limit work to ≤ 16 consecutive hours. We simulated two traditional schedules and three novel schedules using the mathematical model. The traditional schedules had extended duration work shifts (≥24 h) with overnight work shifts every second shift (including every third night, Q3) or every third shift (including every fourth night, Q4) night; the novel schedules had two different cross-cover (XC) night team schedules (XC-V1 and XC-V2) and a Rapid Cycle Rotation (RCR) schedule. Predicted objective performance and subjective alertness for each work shift were computed for each individual's schedule within a team and then combined for the team as a whole. Our primary outcome was the amount of time within a work shift during which a team's model-predicted objective performance and subjective alertness were lower than that expected after 16 or 24 h of continuous wake in an otherwise rested individual. The model predicted fewer hours with poor performance and alertness, especially during night-time work hours, for all three novel schedules than for either the traditional Q3 or Q4 schedules. Three proposed schedules that eliminate extended shifts may improve performance and alertness compared with traditional Q3 or Q4 schedules. Predicted times of worse performance and alertness were at night, which is also a time when supervision of trainees is lower. Mathematical modeling provides a quantitative comparison approach with potential to aid residency programs in schedule analysis and redesign.

  16. A comparative evaluation of two decompression procedures for technical diving using inflammatory responses: compartmental versus ratio deco.

    PubMed

    Spisni, Enzo; Marabotti, Claudio; De Fazio, Luigia; Valerii, Maria Chiara; Cavazza, Elena; Brambilla, Stefano; Hoxha, Klarida; L'Abbate, Antonio; Longobardi, Pasquale

    2017-03-01

    The aim of this study was to compare two decompression procedures commonly adopted by technical divers: the ZH-L16 algorithm modified by 30/85 gradient factors (compartmental decompression model, CDM) versus the 'ratio decompression strategy' (RDS). The comparison was based on an analysis of changes in diver circulating inflammatory profiles caused by decompression from a single dive. Fifty-one technical divers performed a single trimix dive to 50 metres' sea water (msw) for 25 minutes followed by enriched air (EAN50) and oxygen decompression. Twenty-three divers decompressed according to a CDM schedule and 28 divers decompressed according to a RDS schedule. Peripheral blood for detection of inflammatory markers was collected before and 90 min after diving. Venous gas emboli were measured 30 min after diving using 2D echocardiography. Matched groups of 23 recreational divers (dive to 30 msw; 25 min) and 25 swimmers were also enrolled as control groups to assess the effects of decompression from a standard air dive or of exercise alone on the inflammatory profile. Echocardiography at the single 30 min observation post dive showed no significant differences between the two decompression procedures. Divers adopting the RDS showed a worsening of post-dive inflammatory profile compared to the CDM group, with significant increases in circulating chemokines CCL2 (P = 0.001) and CCL5 (P = 0.006) levels. There was no increase in chemokines following the CDM decompression. The air scuba group also showed a statistically significant increase in CCL2 (P < 0.001) and CCL5 (P = 0.003) levels post dive. No cases of decompression sickness occurred. The ratio deco strategy did not confer any benefit in terms of bubbles but showed the disadvantage of increased decompression-associated secretion of inflammatory chemokines involved in the development of vascular damage.

  17. Trade Study of Multiple Thruster Options for the Mars Airplane Concept

    NASA Technical Reports Server (NTRS)

    Kuhl, Christopher A.; Gayle, Steven W.; Hunter, Craig A.; Kenney, Patrick S.; Scola, Salvatore; Paddock, David A.; Wright, Henry S.; Gasbarre, Joseph F.

    2009-01-01

    A trade study was performed at NASA Langley Research Center under the Planetary Airplane Risk Reduction (PARR) project (2004-2005) to examine the option of using multiple, smaller thrusters in place of a single large thruster on the Mars airplane concept with the goal to reduce overall cost, schedule, and technical risk. The 5-lbf (22N) thruster is a common reaction control thruster on many satellites. Thousands of these types of thrusters have been built and flown on numerous programs, including MILSTAR and Intelsat VI. This study has examined the use of three 22N thrusters for the Mars airplane propulsion system and compared the results to those of the baseline single thruster system.

  18. An Update on the Role of Systems Modeling in the Design and Verification of the James Webb Space Telescope

    NASA Technical Reports Server (NTRS)

    Muheim, Danniella; Menzel, Michael; Mosier, Gary; Irish, Sandra; Maghami, Peiman; Mehalick, Kimberly; Parrish, Keith

    2010-01-01

    The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. The assembled models themselves are complex and require the insight of technical experts to assess their ability to meet their objectives. This paper describes the systems engineering and modeling approach used on the JWST through the detailed design phase.

  19. Experimental techniques for in-ring reaction experiments

    NASA Astrophysics Data System (ADS)

    Mutterer, M.; Egelhof, P.; Eremin, V.; Ilieva, S.; Kalantar-Nayestanaki, N.; Kiselev, O.; Kollmus, H.; Kröll, T.; Kuilman, M.; Chung, L. X.; Najafi, M. A.; Popp, U.; Rigollet, C.; Roy, S.; von Schmid, M.; Streicher, B.; Träger, M.; Yue, K.; Zamora, J. C.; the EXL Collaboration

    2015-11-01

    As a first step of the EXL project scheduled for the New Experimental Storage Ring at FAIR a precursor experiment (E105) was performed at the ESR at GSI. For this experiment, an innovative differential pumping concept, originally proposed for the EXL recoil detector ESPA, was successfully applied. The implementation and essential features of this novel technical concept will be discussed, as well as details on the detectors and the infrastructure around the internal gas-jet target. With 56Ni(p, p)56Ni elastic scattering at 400 MeV u-1, a nuclear reaction experiment with stored radioactive beams was realized for the first time. Finally, perspectives for a next-generation EXL-type setup are briefly discussed.

  20. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  1. A Statistical Project Control Tool for Engineering Managers

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  2. Performance of the Prototype Readout System for the CMS Endcap Hadron Calorimeter Upgrade

    NASA Astrophysics Data System (ADS)

    Chaverin, Nate; Dittmann, Jay; Hatakeyama, Kenichi; Pastika, Nathaniel; CMS Collaboration

    2016-03-01

    The Compact Muon Solenoid (CMS) experiment at the CERN Large Hadron Collider (LHC) will upgrade the photodetectors and readout systems of the endcap hadron calorimeter during the technical stop scheduled for late 2016 and early 2017. A major milestone for this project was a highly successful testbeam run at CERN in August 2015. The testbeam run served as a full integration test of the electronics, allowing a study of the response of the preproduction electronics to the true detector light profile, as well as a test of the light yield of various new plastic scintillator materials. We present implications for the performance of the hadron calorimeter front-end electronics based on testbeam data, and we report on the production status of various components of the system in preparation for the upgrade.

  3. Home Health Care for California's Injured Workers: Options for Implementing a Fee Schedule.

    PubMed

    Wynn, Barbara O; Boustead, Anne

    2015-07-15

    The California Department of Industrial Relations/Division of Worker's Compensation asked RAND to provide technical assistance in developing a fee schedule for home health services provided to injured workers. The fee schedule needs to address the full spectrum of home health services ranging from skilled nursing and therapy services to unskilled personal care or chore services that may be provided by family members. RAND researchers consulted with stakeholders in the California workers' compensation system to outline issues the fee schedule should address, reviewed home health fee schedules used by other payers, and conducted interviews with WC administrators from other jurisdictions to elicit their experiences. California stakeholders identified unskilled attendant services as most problematic in determining need and payment rates, particularly services furnished by family members. RAND researchers concentrated on fee schedule options that would result in a single fee schedule covering the full range of home health care services furnished to injured workers and made three sets of recommendations. The first set pertains to obtaining additional information that would highlight the policy issues likely to occur with the implementation of the fee schedule and alternatives for assessing an injured worker's home health care needs. Another approach conforms most closely with the Labor Code requirements. It would integrate the fee schedules used by Medicare, In-Home Health Supportive Services, and the federal Office of Workers' Compensation. The third approach would base the home health fee schedule on rules used by the federal Office of Workers' Compensation.

  4. Tug fleet and ground operations schedules and controls. Volume 2: part 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

  5. Orbit transfer vehicle engine study. Volume 2: Technical report

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The orbit transfer vehicle (OTV) engine study provided parametric performance, engine programmatic, and cost data on the complete propulsive spectrum that is available for a variety of high energy, space maneuvering missions. Candidate OTV engines from the near term RL 10 (and its derivatives) to advanced high performance expander and staged combustion cycle engines were examined. The RL 10/RL 10 derivative performance, cost and schedule data were updated and provisions defined which would be necessary to accommodate extended low thrust operation. Parametric performance, weight, envelope, and cost data were generated for advanced expander and staged combustion OTV engine concepts. A prepoint design study was conducted to optimize thrust chamber geometry and cooling, engine cycle variations, and controls for an advanced expander engine. Operation at low thrust was defined for the advanced expander engine and the feasibility and design impact of kitting was investigated. An analysis of crew safety and mission reliability was conducted for both the staged combustion and advanced expander OTV engine candidates.

  6. Shared-Ride Taxi Computer Control System Requirements Study

    DOT National Transportation Integrated Search

    1977-08-01

    The technical problem of scheduling and routing shared-ride taxi service is so great that only computers can handle it efficiently. This study is concerned with defining the requirements of such a computer system. The major objective of this study is...

  7. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ordinarily should not be required, but if available should be considered); (2) Engineering work, production scheduling, planning, technical study and supervision, and other necessary services; (3) Efficiency of the contractor, with particular regard to— (i) Attainment of quantity and quality production; (ii) Reduction of...

  8. Space station systems technology study (add-on task). Volume 3: Technology advancement program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Program plans are given for an integrating controller for space station autonomy as well as for controls and displays. The technical approach, facility requirements and candidate facilities, development schedules, and resource requirements estimates are given.

  9. 48 CFR 1034.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...

  10. Getting Cable TV Off to a Good Start.

    ERIC Educational Resources Information Center

    Ingold, Charles H.

    1988-01-01

    Reviews the cable television production course at the University of Northern Colorado. Considers technical needs and scheduling for the course, and discusses problems associated with student newscasts. Concludes that the production course provided valuable experience for broadcast journalism students. (MM)

  11. Audit of thrice- versus twice-weekly ECT.

    PubMed

    Roche, Eric; Lope, Jasmin; Hughes, Helen; McCullagh, Niamh; Larkin, Terence; Feeney, Larkin

    2012-09-01

    There is a lack of knowledge regarding some basic differences between different electroconvulsive therapy (ECT) treatment schedules. To examine differences, including ECT technical parameters and length of stay, between thrice- and twice-weekly ECT treatment schedules. Prospective audit of the changeover period of administering thrice- to twice-weekly ECT in a Dublin psychiatric hospital. Twice-weekly ECT was associated with significantly lower total electricity dosage administered, a tendency toward shorter overall hospital stay and fewer ECT treatments compared to thrice-weekly ECT. Our results support the current international trend toward giving ECT twice weekly.

  12. Space Tug Docking Study. Volume 5: Cost Analysis

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

  13. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  14. AdaNET research project

    NASA Technical Reports Server (NTRS)

    Digman, R. Michael

    1988-01-01

    The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.

  15. Networks Technology Conference

    NASA Technical Reports Server (NTRS)

    Tasaki, Keiji K. (Editor)

    1993-01-01

    The papers included in these proceedings represent the most interesting and current topics being pursued by personnel at GSFC's Networks Division and supporting contractors involved in Space, Ground, and Deep Space Network (DSN) technical work. Although 29 papers are represented in the proceedings, only 12 were presented at the conference because of space and time limitations. The proceedings are organized according to five principal technical areas of interest to the Networks Division: Project Management; Network Operations; Network Control, Scheduling, and Monitoring; Modeling and Simulation; and Telecommunications Engineering.

  16. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  17. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...

  18. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...

  19. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...

  20. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...

  1. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...

  2. Limited Investigation into Regenerative Braking and Energy Storage for Mass Transit Systems

    DOT National Transportation Integrated Search

    1978-03-01

    This study examines the technical and economic aspects of a regenerative braking/flywheel energy storage subway system. In order to define the analytical models accurately, it was necessary to gather data on the trains, rail network, schedules, and a...

  3. 75 FR 27375 - Postal Rate Case Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... POSTAL REGULATORY COMMISSION [Docket No. PI2010-3; Order No. 456] Postal Rate Case Management AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is seeking comments relevant to management of an anticipated exigent postal rate case. It has scheduled a technical conference...

  4. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  5. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  6. Using Technical Performance Measures

    NASA Technical Reports Server (NTRS)

    Garrett, Christopher J.; Levack, Daniel J. H.; Rhodes, Russel E.

    2011-01-01

    All programs have requirements. For these requirements to be met, there must be a means of measurement. A Technical Performance Measure (TPM) is defined to produce a measured quantity that can be compared to the requirement. In practice, the TPM is often expressed as a maximum or minimum and a goal. Example TPMs for a rocket program are: vacuum or sea level specific impulse (lsp), weight, reliability (often expressed as a failure rate), schedule, operability (turn-around time), design and development cost, production cost, and operating cost. Program status is evaluated by comparing the TPMs against specified values of the requirements. During the program many design decisions are made and most of them affect some or all of the TPMs. Often, the same design decision changes some TPMs favorably while affecting other TPMs unfavorably. The problem then becomes how to compare the effects of a design decision on different TPMs. How much failure rate is one second of specific impulse worth? How many days of schedule is one pound of weight worth? In other words, how to compare dissimilar quantities in order to trade and manage the TPMs to meet all requirements. One method that has been used successfully and has a mathematical basis is Utility Analysis. Utility Analysis enables quantitative comparison among dissimilar attributes. It uses a mathematical model that maps decision maker preferences over the tradeable range of each attribute. It is capable of modeling both independent and dependent attributes. Utility Analysis is well supported in the literature on Decision Theory. It has been used at Pratt & Whitney Rocketdyne for internal programs and for contracted work such as the J-2X rocket engine program. This paper describes the construction of TPMs and describes Utility Analysis. It then discusses the use of TPMs in design trades and to manage margin during a program using Utility Analysis.

  7. Planning additional drilling campaign using two-space genetic algorithm: A game theoretical approach

    NASA Astrophysics Data System (ADS)

    Kumral, Mustafa; Ozer, Umit

    2013-03-01

    Grade and tonnage are the most important technical uncertainties in mining ventures because of the use of estimations/simulations, which are mostly generated from drill data. Open pit mines are planned and designed on the basis of the blocks representing the entire orebody. Each block has different estimation/simulation variance reflecting uncertainty to some extent. The estimation/simulation realizations are submitted to mine production scheduling process. However, the use of a block model with varying estimation/simulation variances will lead to serious risk in the scheduling. In the medium of multiple simulations, the dispersion variances of blocks can be thought to regard technical uncertainties. However, the dispersion variance cannot handle uncertainty associated with varying estimation/simulation variances of blocks. This paper proposes an approach that generates the configuration of the best additional drilling campaign to generate more homogenous estimation/simulation variances of blocks. In other words, the objective is to find the best drilling configuration in such a way as to minimize grade uncertainty under budget constraint. Uncertainty measure of the optimization process in this paper is interpolation variance, which considers data locations and grades. The problem is expressed as a minmax problem, which focuses on finding the best worst-case performance i.e., minimizing interpolation variance of the block generating maximum interpolation variance. Since the optimization model requires computing the interpolation variances of blocks being simulated/estimated in each iteration, the problem cannot be solved by standard optimization tools. This motivates to use two-space genetic algorithm (GA) approach to solve the problem. The technique has two spaces: feasible drill hole configuration with minimization of interpolation variance and drill hole simulations with maximization of interpolation variance. Two-space interacts to find a minmax solution iteratively. A case study was conducted to demonstrate the performance of approach. The findings showed that the approach could be used to plan a new drilling campaign.

  8. The safety of magnetic resonance imaging in patients with programmable implanted intrathecal drug delivery systems: a 3-year prospective study.

    PubMed

    De Andres, Jose; Villanueva, Vicente; Palmisani, Stefano; Cerda-Olmedo, German; Lopez-Alarcon, Maria Dolores; Monsalve, Vicente; Minguez, Ana; Martinez-Sanjuan, Vicente

    2011-05-01

    It is common clinical practice to perform magnetic resonance imaging (MRI) in patients with indwelling programmable intrathecal drug delivery (IDD) systems, although the safety of the procedure has never been documented. We performed a single-center, 3-year, prospective evaluation in patients with a programmable implanted IDD to assess patient discomfort, IDD technical failures, and adverse effects during and after exposure to MRI. Forty-three consecutive patients with an implanted programmable IDD system (SynchroMed® EL Implantable Infusion Pump, Model 8626L-18, and SynchroMed® II Model 8637-20, 8637-40; Medtronic, Inc., Minneapolis, MN) requiring a scheduled MRI evaluation were studied during a 3-year period. All MRI scans were performed with a 1.5-tesla clinical use magnet and a specific absorption rate of no more than 0.9 W/kg. Radiograph control was used to confirm postexposure pump rotor movement and detect system dislocations. IDD system failures, patient satisfaction, and discomfort were recorded. None of the patients experienced signs of drug overinfusion that could lead to hemodynamic, respiratory, or neurologic alterations. Radiologic evaluation after MRI revealed no spatial displacements of the intrathecal catheter tip or body pump, and programmer telemetry confirmed the infusion recovery. Patients' satisfaction after the procedure was high. Performing an MRI scan with the proposed protocol in patients with an implanted Medtronic programmable IDD system resulted in virtually no technical or medical complications. © 2011 International Anesthesia Research Society

  9. The effect of environmental factors on technical and scale efficiency of primary health care providers in Greece.

    PubMed

    Kontodimopoulos, Nick; Moschovakis, Giorgos; Aletras, Vassilis H; Niakas, Dimitris

    2007-11-17

    The purpose of this study was to compare technical and scale efficiency of primary care centers from the two largest Greek providers, the National Health System (NHS) and the Social Security Foundation (IKA) and to determine if, and how, efficiency is affected by various exogenous factors such as catchment population and location. The sample comprised of 194 units (103 NHS and 91 IKA). Efficiency was measured with Data Envelopment Analysis (DEA) using three inputs, -medical staff, nursing/paramedical staff, administrative/other staff- and two outputs, which were the aggregated numbers of scheduled/emergency patient visits and imaging/laboratory diagnostic tests. Facilities were categorized as small, medium and large (<15,000, 15,000-30,000 and >30,000 respectively) to reflect catchment population and as urban/semi-urban or remote/island to reflect location. In a second stage analysis, technical and scale efficiency scores were regressed against facility type (NHS or IKA), size and location using multivariate Tobit regression. Regarding technical efficiency, IKA performed better than the NHS (84.9% vs. 70.1%, Mann-Whitney P < 0.001), smaller units better than medium-sized and larger ones (84.2% vs. 72.4% vs. 74.3%, Kruskal-Wallis P < 0.01) and remote/island units better than urban centers (81.1% vs. 75.7%, Mann-Whitney P = 0.103). As for scale efficiency, IKA again outperformed the NHS (89.7% vs. 85.9%, Mann-Whitney P = 0.080), but results were reversed in respect to facility size and location. Specifically, larger units performed better (96.3% vs. 90.9% vs. 75.9%, Kruskal-Wallis P < 0.001), and urban units showed higher scale efficiency than remote ones (91.9% vs. 75.3%, Mann-Whitney P < 0.001). Interestingly 75% of facilities appeared to be functioning under increasing returns to scale. Within-group comparisons revealed significant efficiency differences between the two primary care providers. Tobit regression models showed that facility type, size and location were significant explanatory variables of technical and scale efficiency. Variations appeared to exist in the productive performance of the NHS and IKA as the two main primary care providers in Greece. These variations reflect differences in primary care organization, economical incentives, financial constraints, sociodemographic and local peculiarities. In all technical efficiency comparisons, IKA facilities appeared to outperform NHS ones irrespective of facility size or location. In respect to scale efficiency, the results were to some extent inconclusive and observed differences were mostly insignificant, although again IKA appeared to perform better.

  10. The effect of requirements prioritization on avionics system conceptual design

    NASA Astrophysics Data System (ADS)

    Lorentz, John

    This dissertation will provide a detailed approach and analysis of a new collaborative requirements prioritization methodology that has been used successfully on four Coast Guard avionics acquisition and development programs valued at $400M+. A statistical representation of participant study results will be discussed and analyzed in detail. Many technically compliant projects fail to deliver levels of performance and capability that the customer desires. Some of these systems completely meet "threshold" levels of performance; however, the distribution of resources in the process devoted to the development and management of the requirements does not always represent the voice of the customer. This is especially true for technically complex projects such as modern avionics systems. A simplified facilitated process for prioritization of system requirements will be described. The collaborative prioritization process, and resulting artifacts, aids the systems engineer during early conceptual design. All requirements are not the same in terms of customer priority. While there is a tendency to have many thresholds inside of a system design, there is usually a subset of requirements and system performance that is of the utmost importance to the design. These critical capabilities and critical levels of performance typically represent the reason the system is being built. The systems engineer needs processes to identify these critical capabilities, the associated desired levels of performance, and the risks associated with the specific requirements that define the critical capability. The facilitated prioritization exercise is designed to collaboratively draw out these critical capabilities and levels of performance so they can be emphasized in system design. Developing the purpose, scheduling and process for prioritization events are key elements of systems engineering and modern project management. The benefits of early collaborative prioritization flow throughout the project schedule, resulting in greater success during system deployment and operational testing. This dissertation will discuss the data and findings from participant studies, present a literature review of systems engineering and design processes, and test the hypothesis that the prioritization process had no effect on stakeholder sentiment related to the conceptual design. In addition, the "Requirements Rationalization" process will be discussed in detail. Avionics, like many other systems, has transitioned from a discrete electronics engineering, hard engineering discipline to incorporate software engineering as a core process of the technology development cycle. As with other software-based systems, avionics now has significant soft system attributes that must be considered in the design process. The boundless opportunities that exist in software design demand prioritization to focus effort onto the critical functions that the software must provide. This has been a well documented and understood phenomenon in the software development community for many years. This dissertation will attempt to link the effect of software integrated avionics to the benefits of prioritization of requirements in the problem space and demonstrate the sociological and technical benefits of early prioritization practices.

  11. Power-based Shift Schedule for Pure Electric Vehicle with a Two-speed Automatic Transmission

    NASA Astrophysics Data System (ADS)

    Wang, Jiaqi; Liu, Yanfang; Liu, Qiang; Xu, Xiangyang

    2016-11-01

    This paper introduces a comprehensive shift schedule for a two-speed automatic transmission of pure electric vehicle. Considering about driving ability and efficiency performance of electric vehicles, the power-based shift schedule is proposed with three principles. This comprehensive shift schedule regards the vehicle current speed and motor load power as input parameters to satisfy the vehicle driving power demand with lowest energy consumption. A simulation model has been established to verify the dynamic and economic performance of comprehensive shift schedule. Compared with traditional dynamic and economic shift schedules, simulation results indicate that the power-based shift schedule is superior to traditional shift schedules.

  12. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  13. Thermal energy storage subsystems. A collection of quarterly reports

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design, development, and progress toward the delivery of three subsystems is discussed. The subsystem used a salt hydrate mixture for thermal energy storage. The program schedules, technical data, and other program activities from October 1, 1976, through December 31, 1977 are presented.

  14. Architectural: Construction, Supervision, and Inspection. Course of Study.

    ERIC Educational Resources Information Center

    Robson, Frank

    This architectural course of study is part of a construction, supervision, and inspection series, which provides instructional materials for community or junior college technical courses in the inspection program. Material covered pertains to: construction contracts, schedules, and site preparation; footings and foundations; masonry and…

  15. 24 CFR 1006.430 - Corrective and remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... plan; (3) Made substantial progress in carrying out its program and achieving its quantifiable goals as... to submit progress schedules for completing activities or complying with the requirements of the Act... appropriate technical assistance using existing grant funds or other available resources to overcome the...

  16. Preliminary plan for testing a thermionic reactor in the Plum Brook Space Power Facility

    NASA Technical Reports Server (NTRS)

    Haley, F. A.

    1972-01-01

    A preliminary plan is presented for testing a thermionic reactor in the Plum Brook Space Power Facility (SPF). A technical approach, cost estimate, manpower estimate, and schedule are presented to cover a 2 year full power reactor test.

  17. 76 FR 4574 - Drawbridge Operation Regulations; Oakland Inner Harbor Tidal Canal, Oakland/Alameda, CA, Schedule...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Chance, Aroma Restaurant, Eskelund Marine, Bocanova, Vortex Marine Construction, British Marine, The Outboard Motor Shop, Waterfront Hotel-Miss Pearl's Restaurant, Encinal Yacht Club, Marina Village Inn, Kincaid's Restaurant, Scott's Seafood Restaurant, Captain Ed Payne Technical Services, Il Pescatore...

  18. Contracting Officer Technical Representative Briefing

    NASA Technical Reports Server (NTRS)

    Gettleman, Alan

    2001-01-01

    This viewgraph presentation gives an overview of the Agency Occupational Health Program, including details on organizational and personnel changes, medical program standardization, programmatic status, policies, standards, and guides and resources, industrial hygiene and radiological health, assessment schedule and methodology, upcoming events, and the future of the program.

  19. A simplified technique of percutaneous hepatic artery port-catheter insertion for the treatment of advanced hepatocellular carcinoma with portal vein invasion.

    PubMed

    Choi, Sun Young; Kim, Ah Hyun; Kim, Kyung Ah; Won, Jong Yun; Lee, Do Yun; Lee, Kwang-Hun

    2010-01-01

    We assessed the outcomes of a simplified technique for the percutaneous placement of a hepatic artery port-catheter system for chemotherapy infusion in advanced hepatocellular carcinoma with portal vein invasion. From February 2003 to February 2008, percutaneous hepatic artery port-catheter insertion was performed in 122 patients who had hepatocellular carcinoma with portal vein invasion. The arterial access route was the common femoral artery. The tip of the catheter was wedged into the right gastroepiploic artery without an additional fixation device. A side hole was positioned at the distal common hepatic artery to allow the delivery of chemotherapeutic agents into the hepatic arteries. Coil embolization was performed only to redistribute to the hepatic arteries or to prevent the inadvertent delivery of chemotherapeutic agents into extrahepatic arteries. The port chamber was created at either the supra-inguinal or infra-inguinal region. Technical success was achieved in all patients. Proper positioning of the side hole was checked before each scheduled chemotherapy session by port angiography. Catheter-related complications occurred in 19 patients (16%). Revision was achieved in 15 of 18 patients (83%). This simplified method demonstrates excellent technical feasibility, an acceptable range of complications, and is hence recommended for the management of advanced hepatocellular carcinoma with portal vein thrombosis.

  20. LUX-ZEPLIN (LZ) Conceptual Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Akerib, D. S.

    2015-03-09

    The design and performance of the LUX-ZEPLIN (LZ) detector is described as of March 2015 in this Conceptual Design Report. LZ is a second-generation dark-matter detector with the potential for unprecedented sensitivity to weakly interacting massive particles (WIMPs) of masses from a few GeV/c 2 to hundreds of TeV/c 2. With total liquid xenon mass of about 10 tonnes, LZ will be the most sensitive experiment for WIMPs in this mass region by the end of the decade. This report describes in detail the design of the LZ technical systems. Expected backgrounds are quantified and the performance of the experimentmore » is presented. The LZ detector will be located at the Sanford Underground Research Facility in South Dakota. The organization of the LZ Project and a summary of the expected cost and current schedule are given.« less

  1. Deep Space Network (DSN), Network Operations Control Center (NOCC) computer-human interfaces

    NASA Technical Reports Server (NTRS)

    Ellman, Alvin; Carlton, Magdi

    1993-01-01

    The Network Operations Control Center (NOCC) of the DSN is responsible for scheduling the resources of DSN, and monitoring all multi-mission spacecraft tracking activities in real-time. Operations performs this job with computer systems at JPL connected to over 100 computers at Goldstone, Australia and Spain. The old computer system became obsolete, and the first version of the new system was installed in 1991. Significant improvements for the computer-human interfaces became the dominant theme for the replacement project. Major issues required innovating problem solving. Among these issues were: How to present several thousand data elements on displays without overloading the operator? What is the best graphical representation of DSN end-to-end data flow? How to operate the system without memorizing mnemonics of hundreds of operator directives? Which computing environment will meet the competing performance requirements? This paper presents the technical challenges, engineering solutions, and results of the NOCC computer-human interface design.

  2. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  3. Preoperative surgical rehearsal using cadaveric fresh tissue surgical simulation increases resident operative confidence.

    PubMed

    Weber, Erin L; Leland, Hyuma A; Azadgoli, Beina; Minneti, Michael; Carey, Joseph N

    2017-08-01

    Rehearsal is an essential part of mastering any technical skill. The efficacy of surgical rehearsal is currently limited by low fidelity simulation models. Fresh cadaver models, however, offer maximal surgical simulation. We hypothesize that preoperative surgical rehearsal using fresh tissue surgical simulation will improve resident confidence and serve as an important adjunct to current training methods. Preoperative rehearsal of surgical procedures was performed by plastic surgery residents using fresh cadavers in a simulated operative environment. Rehearsal was designed to mimic the clinical operation, complete with a surgical technician to assist. A retrospective, web-based survey was used to assess resident perception of pre- and post-procedure confidence, preparation, technique, speed, safety, and anatomical knowledge on a 5-point scale (1= not confident, 5= very confident). Twenty-six rehearsals were performed by 9 residents (PGY 1-7) an average of 4.7±2.1 days prior to performance of the scheduled operation. Surveys demonstrated a median pre-simulation confidence score of 2 and a post-rehearsal score of 4 (P<0.01). The perceived improvement in confidence and performance was greatest when simulation was performed within 3 days of the scheduled case. All residents felt that cadaveric simulation was better than standard preparation methods of self-directed reading or discussion with other surgeons. All residents believed that their technique, speed, safety, and anatomical knowledge improved as a result of simulation. Fresh tissue-based preoperative surgical rehearsal was effectively implemented in the residency program. Resident confidence and perception of technique improved. Survey results suggest that cadaveric simulation is beneficial for all levels of residents. We believe that implementation of preoperative surgical rehearsal is an effective adjunct to surgical training at all skill levels in the current environment of decreased work hours.

  4. The cost of doing business: cost structure of electronic immunization registries.

    PubMed

    Fontanesi, John M; Flesher, Don S; De Guire, Michelle; Lieberthal, Allan; Holcomb, Kathy

    2002-10-01

    To predict the true cost of developing and maintaining an electronic immunization registry, and to set the framework for developing future cost-effective and cost-benefit analysis. Primary data collected at three immunization registries located in California, accounting for 90 percent of all immunization records in registries in the state during the study period. A parametric cost analysis compared registry development and maintenance expenditures to registry performance requirements. Data were collected at each registry through interviews, reviews of expenditure records, technical accomplishments development schedules, and immunization coverage rates. The cost of building immunization registries is predictable and independent of the hardware/software combination employed. The effort requires four man-years of technical effort or approximately $250,000 in 1998 dollars. Costs for maintaining a registry were approximately $5,100 per end user per three-year period. There is a predictable cost structure for both developing and maintaining immunization registries. The cost structure can be used as a framework for examining the cost-effectiveness and cost-benefits of registries. The greatest factor effecting improvement in coverage rates was ongoing, user-based administrative investment.

  5. Ocean Optics Protocols for Satellite Ocean Color Sensor Validation. Volume 1; Revised

    NASA Technical Reports Server (NTRS)

    Mueller, James L. (Editor); Fargion, Giulietta (Editor); Mueller, J. L.; Trees, C.; Austin, R. W.; Pietras, C.; Hooker, S.; Holben, B.; McClain, Charles R.; Clark, D. K.; hide

    2002-01-01

    This document stipulates protocols for measuring bio-optical and radiometric data for the SIMBIOS Project. It supersedes the earlier version, and is organized into four parts: Introductory Background, Instrument Characteristics, Field Measurements and Data Analysis, Data Reporting and Archival. Changes in this revision include the addition of three new chapters: (1) Fundamental Definitions, Relationships and Conventions; (2) MOBY, A Radiometric Buoy for Performance Monitoring and Vicarious Calibration of Satellite Ocean Color Sensors: Measurement and Data Analysis Protocols; and (3) Normalized Water-Leaving Radiance and Remote Sensing Reflectance: Bidirectional Reflectance and Other Factors. Although the present document represents another significant, incremental improvement in the ocean optics protocols, there are several protocols that have either been overtaken by recent technological progress, or have been otherwise identified as inadequate. Revision 4 is scheduled for completion sometime in 2003. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational Project. The contributions are published as submitted, after only minor editing to correct obvious grammatical or clerical errors.

  6. Ocean Optics Protocols for Satellite Ocean Color Sensor Validation. Volume 2; Revised

    NASA Technical Reports Server (NTRS)

    Mueller, James L. (Editor); Fargion, Giulietta S. (Editor); Trees, C.; Austin, R. W.; Pietras, C. (Editor); Hooker, S.; Holben, B.; McClain, Charles R.; Clark, D. K.; Yuen, M.

    2002-01-01

    This document stipulates protocols for measuring bio-optical and radiometric data for the SIMBIOS Project. It supersedes the earlier version, and is organized into four parts: Introductory Background, Instrument Characteristics, Field Measurements and Data Analysis, Data Reporting and Archival. Changes in this revision include the addition of three new chapters: (1) Fundamental Definitions, Relationships and Conventions; (2) MOBY, A Radiometric Buoy for Performance Monitoring and Vicarious Calibration of Satellite Ocean Color Sensors: Measurement and Data Analysis Protocols; and (3) Normalized Water-Leaving Radiance and Remote Sensing Reflectance: Bidirectional Reflectance and Other Factors. Although the present document represents another significant, incremental improvement in the ocean optics protocols, there are several protocols that have either been overtaken by recent technological progress, or have been otherwise identified as inadequate. Revision 4 is scheduled for completion sometime in 2003. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational Project. The contributions are published as submitted, after only minor editing to correct obvious grammatical or clerical errors.

  7. Cost and Schedule Analytical Techniques Development: Option 1

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  8. Overview of Marshall Space Flight Center Activities for the Combustion Stability Tool Development Program

    NASA Technical Reports Server (NTRS)

    Kenny, R. J.; Greene, W. D.

    2016-01-01

    This presentation covers the overall scope, schedule, and activities associated with the NASA - Marshall Space Flight Center (MSFC) involvement with the Combustion Stability Tool Development (CSTD) program. The CSTD program is funded by the Air Force Space & Missile Systems Center; it is approximately two years in duration and; and it is sponsoring MSFC to: design, fabricate, & execute multi-element hardware testing, support Air Force Research Laboratory (AFRL) single element testing, and execute testing of a small-scale, multi-element combustion chamber. Specific MSFC Engineering Directorate involvement, per CSTD-sponsored task, will be outlined. This presentation serves a primer for the corresponding works that provide details of the technical work performed by individual groups within MSFC.

  9. Condensate polisher prefiltration study for Laguna Verde Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garcia, A.; Oyen, L.C.; Nelson, R.A.

    1995-05-01

    This paper describes an analysis of the iron and copper in the condensate and the technical and economic assessment of the installation of condensate polisher prefilters in Comision Federal de Electricidad`s Laguna Verde Nuclear Generating Station (LVNGS) north of Veracruz, Mexico. LVNGS is a 654 MWe General Electric BWR plant; Unit 1 has been in commercial operation since July, 1990, and Unit 2 is scheduled to become operational in June, 1995. The primary purpose of this study was to (1) analyze the high iron and copper concentrations in the condensate and feedwater, (2) identify, assess, and evaluate techniques to reducemore » the iron and copper concentrations, and (3) perform a cost-benefit analysis of the installation of implementing the appropriate techniques.« less

  10. Technical guide on documentation requirements for open market contract acquisitions of information resources

    NASA Technical Reports Server (NTRS)

    Shaw, Asa L., Jr.; Kivett, William R.; Taylor, James Y.

    1990-01-01

    A guide is presented to assist requestors in formulating and submitting the required Complete Package for Information Resources (IR) acquisitions. Advance discussions with cognizant procurement personnel are strongly recommended for complex IR requirements or for those requestors new to the acquisition process. Open Market means the requirement either is not available on GSA Schedule Contract or exceeds the $300,000 threshold and/or the quantity Maximum Order Limitation of the GSA Schedule Contract. Only open market contract acquisitions (i.e., in excess of the $25,000 small purchase threshold), are addressed.

  11. Zero-gravity atmospheric Cloud Physics Experiment Laboratory; Programmatics report

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The programmatics effort included comprehensive analyses in four major areas: (1) work breakdown structure, (2) schedules, (3) costs, and (4) supporting research and technology. These analyses are discussed in detail in the following sections which identify and define the laboratory project development schedule, cost estimates, funding distributions and supporting research and technology requirements. All programmatics analyses are correlated among themselves and with the technical analyses by means of the work breakdown structure which serves as a common framework for program definition. In addition, the programmatic analyses reflect the results of analyses and plans for reliability, safety, test, and maintenance and refurbishment.

  12. Taking the Lag out of Jet Lag through Model-Based Schedule Design

    PubMed Central

    Dean, Dennis A.; Forger, Daniel B.; Klerman, Elizabeth B.

    2009-01-01

    Travel across multiple time zones results in desynchronization of environmental time cues and the sleep–wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep–wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep–wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep–wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep–wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions. PMID:19543382

  13. 38 CFR 4.73 - Schedule of ratings-muscle injuries.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 5302Group II. Function: Depression of arm from vertical overhead to hanging at side (1, 2); downward... muscles of shoulder girdle: (1) Pectoralis major II (costosternal); (2) latissimus dorsi and teres major (teres major, although technically an intrinsic muscle, is included with latissimus dorsi); (3...

  14. 38 CFR 4.73 - Schedule of ratings-muscle injuries.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 5302Group II. Function: Depression of arm from vertical overhead to hanging at side (1, 2); downward... muscles of shoulder girdle: (1) Pectoralis major II (costosternal); (2) latissimus dorsi and teres major (teres major, although technically an intrinsic muscle, is included with latissimus dorsi); (3...

  15. 38 CFR 4.73 - Schedule of ratings-muscle injuries.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 5302Group II. Function: Depression of arm from vertical overhead to hanging at side (1, 2); downward... muscles of shoulder girdle: (1) Pectoralis major II (costosternal); (2) latissimus dorsi and teres major (teres major, although technically an intrinsic muscle, is included with latissimus dorsi); (3...

  16. 38 CFR 4.73 - Schedule of ratings-muscle injuries.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 5302Group II. Function: Depression of arm from vertical overhead to hanging at side (1, 2); downward... muscles of shoulder girdle: (1) Pectoralis major II (costosternal); (2) latissimus dorsi and teres major (teres major, although technically an intrinsic muscle, is included with latissimus dorsi); (3...

  17. 38 CFR 4.73 - Schedule of ratings-muscle injuries.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 5302Group II. Function: Depression of arm from vertical overhead to hanging at side (1, 2); downward... muscles of shoulder girdle: (1) Pectoralis major II (costosternal); (2) latissimus dorsi and teres major (teres major, although technically an intrinsic muscle, is included with latissimus dorsi); (3...

  18. Dredging Research

    DTIC Science & Technology

    1993-02-01

    Engineer Waterways Experiment Station, Vicksburg, MS, POC: Dr. Nicholas Kraus, (601) 634- 2018 . ______________’I.9 DRP Technical Area 1 workshop scheduled...I uold ask you is, ’What are which has been the " bible "of coastal en- videotape to reaffirm my commitment to the avenues we should pursue in this

  19. Lowest Price, Technically Acceptable Evaluation Criteria Used in the November 2014 Request for Proposal for the Program Executive Office Soldier Systems Engineering and Technical Assistance (SETA) Contract

    DTIC Science & Technology

    2017-09-01

    acquisition of goods or services . The acquisition of SETA support can be accomplished using the same source selection processes and procedures available to...professional services , and education & training (OUSD[AT&L]), 2012). The USD(AT&L) issued a memorandum on 4 March 2015 to the Secretaries of the...and financial services (GSA, n.d.-b.). The GSA’s IT Schedule 70 provides access to over 5,000 vendors offering an expansive variety of IT products

  20. Advanced composites technology program

    NASA Technical Reports Server (NTRS)

    Davis, John G., Jr.

    1993-01-01

    This paper provides a brief overview of the NASA Advanced Composites Technology (ACT) Program. Critical technology issues that must be addressed and solved to develop composite primary structures for transport aircraft are delineated. The program schedule and milestones are included. Work completed in the first 3 years of the program indicates the potential for achieving composite structures that weigh less and are cost effective relative to conventional aluminum structure. Selected technical accomplishments are noted. Readers who are seeking more in-depth technical information should study the other papers included in these proceedings.

  1. Advanced Technology System Scheduling Governance Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ang, Jim; Carnes, Brian; Hoang, Thuc

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. Themore » process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).« less

  2. An application of artificial intelligence to automatic telescopes

    NASA Technical Reports Server (NTRS)

    Swanson, Keith; Drummond, Mark; Bresina, John

    1992-01-01

    Automatic Photoelectric Telescopes (APT's) allow an astronomer to be removed form the telescope site in both time and space. APT's 'execute' an observation program (a set of observation requests) expressed in an ASCII-based language (ATIS) and collect observation results expressed in this same language. The observation program is currently constructed by a Principal Astronomer from the requests of multiple users; the execution is currently controlled by a simple heuristic dispatch scheduler. Research aimed at improving the use of APT's is being carried out by the Entropy Reduction Engine (ERE) project at NASA Ames. The overall goal of the ERE project is the study and construction of systems that integrate planning, scheduling, and control. This paper discusses the application of some ERE technical results to the improvement of both the scheduling and the operation of APT's.

  3. Technical Standards for Command and Control Information Systems (CCISs)

    DTIC Science & Technology

    1992-01-01

    initiation, Conformance Testing 149 management, scheduling, resource allocation , logical and IEEE P1 003 146 physical device access, interrupt handling...70 5.2.3 Remote Data Access (RDA) ........................................... 72 5.2.4 Information Resource Dictionary...146 7.2.1.2 POSIX Conformance Testing .............................. 149 7.2.2 Consortia Recommendations

  4. 77 FR 1414 - Approval and Promulgation of State Implementation Plans: Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... the index, some information may not be publicly available, i.e., Confidential Business Information or... section to schedule your inspection. The Regional Office's official hours of business are Monday through... revision submitted by Alaska included a technical analysis using EPA approved models and methods to...

  5. Overview of NASA's Propulsion 21 Effort

    NASA Technical Reports Server (NTRS)

    Long-Davis, Mary Jo

    2006-01-01

    Propulsion 21 technologies contribute to reducing CO2 and NO(x) emissions and noise. Integrated Government/Industry/University research efforts have produced promising initial technical results. Graduate students from 5 partnering universities will benefit from this collaborative research--> educating the future engineering workforce. Phase 2 Efforts scheduled to be completed 3QFY06.

  6. Technical Adequacy of Response to Intervention Decisions

    ERIC Educational Resources Information Center

    VanDerHeyden, Amanda M.

    2011-01-01

    Perhaps the greatest value of response to intervention (RTI) as a decision framework is that it brings attention to variables (e.g., mastery of prerequisite skills, frequency of instructional corrective feedback, reinforcement schedules for correct responding) that if changed might make a meaningful difference for students (e.g., child rate of…

  7. NLC Past Workshops & Conferences

    Science.gov Websites

    NLC Technical SLAC Meeting Schedule Web Comments 2004 Calendar Year 2003 Calendar Year 2003 Chronological listing 2002 Calendar Year 2002 Chronological listing 2001 Calendar Year 2001 Chronological listing 2000 Calendar Year 2000 Chronological listing 1999 Calendar Year 1999 Chronological listing This

  8. Implementation of Distance Support (DS) to Reduce Total Ownership Cost (R-TOC)

    DTIC Science & Technology

    2012-02-01

    ATIS ) for technical documentation,  PMS Scheduling (SKED)  Food Service Management (FSM3). For morale and welfare support, local web content...Development ( TD ) phase and use a systems engineering (SE) approach (similar to Figure 6 above) to help understand ramifications for deleting DS. For

  9. Physical Therapist Assistant Curriculum Development. Curriculum Materials.

    ERIC Educational Resources Information Center

    Blackhawk Technical Inst., Janesville, WI.

    This publication contains a number of materials related to the Blackhawk Technical College (Wisconsin) Physical Therapist Assistant (PTA) program. Contents include a schedule and curriculum outline for the PTA I course; a brochure on the associate degree program; curriculum outline for the associate degree program; and admission procedures and…

  10. 18 CFR 300.11 - Technical support for the rate schedule.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...

  11. 18 CFR 300.11 - Technical support for the rate schedule.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...

  12. 18 CFR 300.11 - Technical support for the rate schedule.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...

  13. 18 CFR 300.11 - Technical support for the rate schedule.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...

  14. 18 CFR 300.11 - Technical support for the rate schedule.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...

  15. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  16. 23 CFR 636.501 - What issues may be addressed in discussions?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false What issues may be addressed in discussions? 636.501 Section 636.501 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND...-take, and may apply to price, schedule, technical requirements, type of contract, or other terms of a...

  17. 23 CFR 636.501 - What issues may be addressed in discussions?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false What issues may be addressed in discussions? 636.501 Section 636.501 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND...-take, and may apply to price, schedule, technical requirements, type of contract, or other terms of a...

  18. 23 CFR 636.501 - What issues may be addressed in discussions?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false What issues may be addressed in discussions? 636.501 Section 636.501 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND...-take, and may apply to price, schedule, technical requirements, type of contract, or other terms of a...

  19. 23 CFR 636.501 - What issues may be addressed in discussions?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false What issues may be addressed in discussions? 636.501 Section 636.501 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND...-take, and may apply to price, schedule, technical requirements, type of contract, or other terms of a...

  20. 23 CFR 636.501 - What issues may be addressed in discussions?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false What issues may be addressed in discussions? 636.501 Section 636.501 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND...-take, and may apply to price, schedule, technical requirements, type of contract, or other terms of a...

  1. Student Services Program Planning and Evaluation: Responsibility, Procedures, Instrument, and Guidelines.

    ERIC Educational Resources Information Center

    Repp, Charles A.; Brach, Ronald C.

    The manual provides a rationale, procedural guidelines, time-schedules, instruments, and supporting documentation for student services program evaluation at SUNY Agricultural and Technical College, Delhi. Six procedural guidelines include: (1) all programs and services should be evaluated at least once every four years, with provision for annual…

  2. "Double Dippers."

    ERIC Educational Resources Information Center

    Gose, Ben

    1995-01-01

    Increasingly, four-year college students are taking additional courses at nearby two-year colleges, for a variety of reasons: to reduce costs, to sample technical education, for scheduling purposes, for smaller classes, and for less difficult courses. In some cases, the four-year college may contract with the two-year college to provide remedial…

  3. Strategic Plan for Standards-Based Reform. Report of Progress.

    ERIC Educational Resources Information Center

    Hawaii State Dept. of Education, Honolulu. Office of the Superintendent.

    This report summarizes the expectations, mission, guiding principles, standards, assessments, and time line for standards implementation for the state of Hawai'i. Implementation was scheduled for completion by August 2000. A technical reference matrix tracks the development of the assessment and accountability system. The completion of specific…

  4. Performance analysis of a large-grain dataflow scheduling paradigm

    NASA Technical Reports Server (NTRS)

    Young, Steven D.; Wills, Robert W.

    1993-01-01

    A paradigm for scheduling computations on a network of multiprocessors using large-grain data flow scheduling at run time is described and analyzed. The computations to be scheduled must follow a static flow graph, while the schedule itself will be dynamic (i.e., determined at run time). Many applications characterized by static flow exist, and they include real-time control and digital signal processing. With the advent of computer-aided software engineering (CASE) tools for capturing software designs in dataflow-like structures, macro-dataflow scheduling becomes increasingly attractive, if not necessary. For parallel implementations, using the macro-dataflow method allows the scheduling to be insulated from the application designer and enables the maximum utilization of available resources. Further, by allowing multitasking, processor utilizations can approach 100 percent while they maintain maximum speedup. Extensive simulation studies are performed on 4-, 8-, and 16-processor architectures that reflect the effects of communication delays, scheduling delays, algorithm class, and multitasking on performance and speedup gains.

  5. A success paradigm for project managers in the aerospace industry

    NASA Astrophysics Data System (ADS)

    Bauer, Barry Jon

    Within the aerospace industry, project managers traditionally have been selected based on their technical competency. While this may lead to brilliant technical solutions to customer requirements, a lack of management ability can result in failed programs that over-run on cost, are late to critical path schedules, fail to fully utilize the diversity of talent available within the program team, and otherwise disappoint key stakeholders. This research study identifies the key competencies that a project manager should possess in order to successfully lead and manage a project in the aerospace industry. The research attempts to show evidence that within the aerospace industry, it is perceived that management competency is more important to project management success than only technical competence.

  6. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 6: IPAD system development and operation

    NASA Technical Reports Server (NTRS)

    Redhed, D. D.; Tripp, L. L.; Kawaguchi, A. S.; Miller, R. E., Jr.

    1973-01-01

    The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.

  7. Lunar mission safety and rescue: Technical summary

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A technical summary is presented of the escape/rescue and the hazards analyses for manned missions and operations in the 1980 time frame. Hazards are interpreted as hazards to man, not to equipment, program schedule, or program objectives. Hazards in 39 individual areas are analyzed, and corrective measures are recommended. Over 200 safety guidelines are proposed, based on significant hazards. Escape and rescue situtations and requirements are identified and analyzed, and escape/survival/rescue concepts are defined to cope with each escape/rescue situation. Areas in which research or technical development efforts could improve mission safety are identified. It is concluded that the primary emphasis should be on survival and escape provisions, with rescue required only where self-help cannot bring the endangered crewmen to a safe haven.

  8. Energy utilization: municipal waste incineration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaBeck, M.F.

    An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less

  9. Multiresource allocation and scheduling for periodic soft real-time applications

    NASA Astrophysics Data System (ADS)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  10. Metrology requirements for the serial production of ELT primary mirror segments

    NASA Astrophysics Data System (ADS)

    Rees, Paul C. T.; Gray, Caroline

    2015-08-01

    The manufacture of the next generation of large astronomical telescopes, the extremely large telescopes (ELT), requires the rapid manufacture of greater than 500 1.44m hexagonal segments for the primary mirror of each telescope. Both leading projects, the Thirty Meter Telescope (TMT) and the European Extremely Large Telescope (E-ELT), have set highly demanding technical requirements for each fabricated segment. These technical requirements, when combined with the anticipated construction schedule for each telescope, suggest that more than one optical fabricator will be involved in the delivery of the primary mirror segments in order to meet the project schedule. For one supplier, the technical specification is challenging and requires highly consistent control of metrology in close coordination with the polishing technologies used in order to optimize production rates. For production using multiple suppliers, however the supply chain is structured, consistent control of metrology along the supply chain will be required. This requires a broader pattern of independent verification than is the case of a single supplier. This paper outlines the metrology requirements for a single supplier throughout all stages of the fabrication process. We identify and outline those areas where metrology accuracy and duration have a significant impact on production efficiency. We use the challenging ESO E-ELT technical specification as an example of our treatment, including actual process data. We further develop this model for the case of a supply chain consisting of multiple suppliers. Here, we emphasize the need to control metrology throughout the supply chain in order to optimize net production efficiency.

  11. Enhancing independent time-management skills of individuals with mental retardation using a Palmtop personal computer.

    PubMed

    Davies, Daniel K; Stock, Steven E; Wehmeyer, Michael L

    2002-10-01

    Achieving greater independence for individuals with mental retardation depends upon the acquisition of several key skills, including time-management and scheduling skills. The ability to perform tasks according to a schedule is essential to domains like independent living and employment. The use of a portable schedule prompting system to increase independence and self-regulation in time-management for individuals with mental retardation was examined. Twelve people with mental retardation participated in a comparison of their use of the technology system to perform tasks on a schedule with use of a written schedule. Results demonstrated the utility of a Palmtop computer with schedule prompting software to increase independence in the performance of vocational and daily living tasks by individuals with mental retardation.

  12. Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Bitten, Robert; Emmons, Debra; Shinn, Stephen A.

    2016-01-01

    Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.

  13. Scheduling from the perspective of the application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berman, F.; Wolski, R.

    1996-12-31

    Metacomputing is the aggregation of distributed and high-performance resources on coordinated networks. With careful scheduling, resource-intensive applications can be implemented efficiently on metacomputing systems at the sizes of interest to developers and users. In this paper we focus on the problem of scheduling applications on metacomputing systems. We introduce the concept of application-centric scheduling in which everything about the system is evaluated in terms of its impact on the application. Application-centric scheduling is used by virtually all metacomputer programmers to achieve performance on metacomputing systems. We describe two successful metacomputing applications to illustrate this approach, and describe AppLeS scheduling agentsmore » which generalize the application-centric scheduling approach. Finally, we show preliminary results which compare AppLeS-derived schedules with conventional strip and blocked schedules for a two-dimensional Jacobi code.« less

  14. Schedule-Aware Workflow Management Systems

    NASA Astrophysics Data System (ADS)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  15. 42 CFR 136.23 - Persons to whom contract health services will be provided.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...—during their full-time attendance at programs of vocational, technical, or academic education, including normal school breaks (such as vacations, semester or other scheduled breaks occurring during their... who were eligible for contract health services at the time of the court order shall continue to be...

  16. Agile Systems Engineering-Kanban Scheduling Subsection

    DTIC Science & Technology

    2017-03-10

    including both online and standalone versions. RESEARCH GOALS The overall Agile SE Management Project research goals are to: 1. Identify agile...March 10, 2017 5 Establish a better technical project management and... Project Management ,” Master of Science Project , Stevens Institute, to be completed in May, 2017. • Smith, Jeffrey, “System of Systems Task

  17. 40 CFR 35.4170 - What kinds of reporting does EPA require?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Managing Your Tag... period which ends June 30 and December 31 of each year. (b) [Reserved] (c) Progress Report Full description in chart or narrative format of the progress your group made in relation to your approved schedule...

  18. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  19. A Comparative Analysis of Community Colleges and Two-Year Technical Colleges.

    ERIC Educational Resources Information Center

    Wilkinson, David

    Community colleges (CC's) are institutions using postsecondary instruction adapted in context, level, and schedule, to the needs of the community in which they are located, offering programs intended for normal completion over a two-year, full-time equivalent period, and usually offering a comprehensive curriculum with transfer, career, and…

  20. School Insurance: Managing the Local Program. Bulletin, 1959, No. 23

    ERIC Educational Resources Information Center

    Finchum, R. N.; Viles, N. E.

    1959-01-01

    This study is the second in a series of publications by the Office of Education on school insurance. Data for this study were adapted from many sources. Among these sources were books of a technical nature, professional magazine articles, State insurance guides, research studies, insurance rating schedules, insurance company bulletins, and…

  1. New Plans for Evening and Correspondence School Students.

    ERIC Educational Resources Information Center

    Lebedev, I.I.

    A general discussion is given concerning revisions in hours and schedules for evening and correspondence school students engaged in higher technical education. The teaching plan for the evening system consists of two parts: one for instruction in the first three years, and the other for the next three. The plan for correspondence study provides…

  2. Schedules, technical status, and program activities in the development of a single family solar space heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A collection of three quarterly reports are given covering the development of two prototype solar heating systems consisting of the following subsystems: collector, storage, control, transport, and site data acquisition. The two systems are being installed at York, Pennsylvania, and Manchester, New Hampshire.

  3. 47 CFR 80.211 - Emission limitations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Emission limitations. 80.211 Section 80.211... MARITIME SERVICES General Technical Standards § 80.211 Emission limitations. The emissions must be attenuated according to the following schedule. (a) The mean power when using emissions H3E, J3E and R3E: (1...

  4. The Self-Schedule System for Instructional-Learning Management in Adaptive School Learning Environments.

    ERIC Educational Resources Information Center

    Wang, Margaret C., Ed.

    The studies in this monograph are designed to examine the implementation processes of an innovative instructional program and the relationship between the implementation process and the achievement of certain program goals in school settings. The monograph is a contribution to the technical aspects of designing and implementing innovative…

  5. Prototype solar heating and combined heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Schedules and technical progress in the development of eight prototype solar heating and combined solar heating and cooling systems are reported. Particular emphasis is given to the analysis and preliminary design for the cooling subsystem, and the setup and testing of a horizontal thermal energy storage tank configuration and collector shroud evaluation.

  6. A New Intelligent Tutoring System

    ERIC Educational Resources Information Center

    Ford, Lindsey

    2008-01-01

    Early in 1984, Logica started an ICAI research contract with MoD (Procurement Executive), which was to be undertaken in collaboration with the technical authority at the Royal Signals and Radar Establishment, Malvern. A prototype system, which has become known as TUTOR, was scheduled for delivery to the client later in 1985. Initially, and for…

  7. Solar heating and cooling systems design and development. [prototype development

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The development of twelve prototype solar heating/cooling systems, six heating and six heating and cooling systems, two each for single family, multi-family, and commercial applications, is reported. Schedules and technical discussions, along with illustrations on the progress made from April 1, 1977 through June 30, 1977 are detailed.

  8. 77 FR 23224 - Request for Technical Input-Standards in Trade Workshops

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... Institute of Standards and Technology (NIST) invites all interested parties, including U.S.-based... the current National Export Strategy. NIST will offer a limited number of workshops each year. Most workshops will be scheduled for a 3 to 5 day period at NIST in Gaithersburg, Maryland. NIST will evaluate...

  9. [Strategics of medical centers and regional hospitals in response to new labour insurance fee schedule].

    PubMed

    Wang, S C; Sheen, P C; Ko, Y C

    1993-02-01

    The purpose of this paper is to evaluate the medical centers and regional hospitals, strategic response to the implementation of new labour insurance fee schedule. This survey selects fifty-one medical centers and regional hospitals, with the response rate of 92.73%. This questionnaire was developed and evaluated by the authors and mailed to the questionnaire response by hospital's director or relative department director. We have selected Shortell et al. (1985) theory as the framework for evaluating and explaining hospital response to regulation environment (ex: change in the reimbursement system) at institutional-level response (ex: hospital association activity aimed at influencing regulation), managerial-level response (ex: increased physician participation in hospital-wide decision making; starting or expanding a planning department) and technical-level response (ex: shared clinical services such as lab., X-ray, pharmacy). The result found that hospitals with the characteristics as non-public ownership, medical centers, bigger size, and more administrative staff are more inclined to adopt institutional-level response. And a technical-level response occurs to hospital when market competibility becomes more intense which leads to higher reimbursement resource dependency.

  10. The advantages of cost plus award fee contracts

    NASA Technical Reports Server (NTRS)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  11. Rolling scheduling of electric power system with wind power based on improved NNIA algorithm

    NASA Astrophysics Data System (ADS)

    Xu, Q. S.; Luo, C. J.; Yang, D. J.; Fan, Y. H.; Sang, Z. X.; Lei, H.

    2017-11-01

    This paper puts forth a rolling modification strategy for day-ahead scheduling of electric power system with wind power, which takes the operation cost increment of unit and curtailed wind power of power grid as double modification functions. Additionally, an improved Nondominated Neighbor Immune Algorithm (NNIA) is proposed for solution. The proposed rolling scheduling model has further improved the operation cost of system in the intra-day generation process, enhanced the system’s accommodation capacity of wind power, and modified the key transmission section power flow in a rolling manner to satisfy the security constraint of power grid. The improved NNIA algorithm has defined an antibody preference relation model based on equal incremental rate, regulation deviation constraints and maximum & minimum technical outputs of units. The model can noticeably guide the direction of antibody evolution, and significantly speed up the process of algorithm convergence to final solution, and enhance the local search capability.

  12. Concepts, requirements, and design approaches for building successful planning and scheduling systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1991-01-01

    Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

  13. Personnel scheduling using an integer programming model- an application at Avanti Blue-Nile Hotels.

    PubMed

    Kassa, Biniyam Asmare; Tizazu, Anteneh Eshetu

    2013-01-01

    In this paper, we report perhaps a first of its kind application of management science in the Ethiopian hotel industry. Avanti Blue Nile Hotels, a newly established five star hotel in Bahir Dar, is the company for which we developed an integer programming model that determines an optimal weekly shift schedule for the Hotel's engineering department personnel while satisfying several constraints including weekly rest requirements per employee, rest requirements between working shifts per employee, required number of personnel per shift, and other constraints. The model is implemented on an excel solver routine. The model enables the company's personnel department management to develop a fair personnel schedule as needed and to effectively utilize personnel resources while satisfying several technical, legal and economic requirements. These encouraging achievements make us optimistic about the gains other Ethiopian organizations can amass by introducing management science approaches in their management planning and decision making systems.

  14. Production Scheduling for Rehabilitation Workshops.

    ERIC Educational Resources Information Center

    Hietala, David A.

    This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…

  15. Analysis and design of gain scheduled control systems. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Shamma, Jeff S.

    1988-01-01

    Gain scheduling, as an idea, is to construct a global feedback control system for a time varying and/or nonlinear plant from a collection of local time invariant designs. However in the absence of a sound analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain schedule design. Such an analysis is presented for three types of gain scheduling situations: (1) a linear parameter varying plant scheduling on its exogenous parameters, (2) a nonlinear plant scheduling on a prescribed reference trajectory, and (3) a nonlinear plant scheduling on the current plant output. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled designs, such as the scheduling variable should vary slowly and capture the plants nonlinearities. Finally, an alternate design framework is proposed which removes the slowing varying restriction or gain scheduled systems. This framework addresses some fundamental feedback issues previously ignored in standard gain.

  16. Advanced composite fuselage technology

    NASA Technical Reports Server (NTRS)

    Ilcewicz, Larry B.; Smith, Peter J.; Horton, Ray E.

    1993-01-01

    Boeing's ATCAS program has completed its third year and continues to progress towards a goal to demonstrate composite fuselage technology with cost and weight advantages over aluminum. Work on this program is performed by an integrated team that includes several groups within The Boeing Company, industrial and university subcontractors, and technical support from NASA. During the course of the program, the ATCAS team has continued to perform a critical review of composite developments by recognizing advances in metal fuselage technology. Despite recent material, structural design, and manufacturing advancements for metals, polymeric matrix composite designs studied in ATCAS still project significant cost and weight advantages for future applications. A critical path to demonstrating technology readiness for composite transport fuselage structures was created to summarize ATCAS tasks for Phases A, B, and C. This includes a global schedule and list of technical issues which will be addressed throughout the course of studies. Work performed in ATCAS since the last ACT conference is also summarized. Most activities relate to crown quadrant manufacturing scaleup and performance verification. The former was highlighted by fabricating a curved, 7 ft. by 10 ft. panel, with cocured hat-stiffeners and cobonded J-frames. In building to this scale, process developments were achieved for tow-placed skins, drape formed stiffeners, braided/RTM frames, and panel cure tooling. Over 700 tests and supporting analyses have been performed for crown material and design evaluation, including structural tests that demonstrated limit load requirements for severed stiffener/skin failsafe damage conditions. Analysis of tests for tow-placed hybrid laminates with large damage indicates a tensile fracture toughness that is higher than that observed for advanced aluminum alloys. Additional recent ATCAS achievements include crown supporting technology, keel quadrant design evaluation, and sandwich process development.

  17. Fusion energy

    NASA Astrophysics Data System (ADS)

    1990-09-01

    The main purpose of the International Thermonuclear Experimental Reactor (ITER) is to develop an experimental fusion reactor through the united efforts of many technologically advanced countries. The ITER terms of reference, issued jointly by the European Community, Japan, the USSR, and the United States, call for an integrated international design activity and constitute the basis of current activities. Joint work on ITER is carried out under the auspices of the International Atomic Energy Agency (IAEA), according to the terms of quadripartite agreement reached between the European Community, Japan, the USSR, and the United States. The site for joint technical work sessions is at the Max Planck Institute of Plasma Physics. Garching, Federal Republic of Germany. The ITER activities have two phases: a definition phase performed in 1988 and the present design phase (1989 to 1990). During the definition phase, a set of ITER technical characteristics and supporting research and development (R and D) activities were developed and reported. The present conceptual design phase of ITER lasts until the end of 1990. The objectives of this phase are to develop the design of ITER, perform a safety and environmental analysis, develop site requirements, define future R and D needs, and estimate cost, manpower, and schedule for construction and operation. A final report will be submitted at the end of 1990. This paper summarizes progress in the ITER program during the 1989 design phase.

  18. Human Systems Integration in Practice: Constellation Lessons Learned

    NASA Technical Reports Server (NTRS)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

  19. Non preemptive soft real time scheduler: High deadline meeting rate on overload

    NASA Astrophysics Data System (ADS)

    Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed

    2015-05-01

    While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.

  20. Associations between shift schedule characteristics with sleep, need for recovery, health and performance measures for regular (semi-)continuous 3-shift systems.

    PubMed

    van de Ven, Hardy A; Brouwer, Sandra; Koolhaas, Wendy; Goudswaard, Anneke; de Looze, Michiel P; Kecklund, Göran; Almansa, Josue; Bültmann, Ute; van der Klink, Jac J L

    2016-09-01

    In this cross-sectional study associations were examined between eight shift schedule characteristics with shift-specific sleep complaints and need for recovery and generic health and performance measures. It was hypothesized that shift schedule characteristics meeting ergonomic recommendations are associated with better sleep, need for recovery, health and performance. Questionnaire data were collected from 491 shift workers of 18 companies with 9 regular (semi)-continuous shift schedules. The shift schedule characteristics were analyzed separately and combined using multilevel linear regression models. The hypothesis was largely not confirmed. Relatively few associations were found, of which the majority was in the direction as expected. In particular early starts of morning shifts and many consecutive shifts seem to be avoided. The healthy worker effect, limited variation between included schedules and the cross-sectional design might explain the paucity of significant results. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet

    1996-01-01

    Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

  2. Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

    NASA Technical Reports Server (NTRS)

    Simon, Tom

    2009-01-01

    To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

  3. Development and implementation of a pharmacist-run comprehensive medication review program in Wisconsin.

    PubMed

    Schoenrock, Danielle L; Hartkopf, Katherine; Boeckelman, Carrie

    2016-12-01

    The development and implementation of a centralized, pharmacist-run population health program were pursued within a health system to increase patient exposure to comprehensive medication reviews (CMRs) and improve visit processes. Program implementation included choosing appropriate pilot pharmacy locations, developing a feasible staffing model, standardizing the workflow, and creating a patient referral process. The impact on patient exposure, specific interventions, and the sustainability of the program were evaluated over a seven-month period. A total of 96 CMRs were scheduled during the data collection period. Attendance at scheduled CMRs was 54% (52 visits); there were 25 cancellations (26%) and 19 no-shows (20%). Since program implementation, there has been more than a twofold increase (2.08) in the number of CMRs completed within the health system. On average, all aspects of each patient visit took 1.78 hours to complete. Pharmacists spent 28% of scheduled time on CMR tasks and 72% of time on telephone calls and technical tasks to maintain appointments. A pharmacist-run CMR program helped to elevate the role of the community pharmacist in a health system and to improve patient exposure to CMRs. Sustaining a centralized CMR program requires support from other members of the health-system team so that pharmacists can spend more time providing patient care and less time on the technical tasks involved. Copyright © 2016 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  4. SMART operational field test evaluation : schedule adherence report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    Among the paratransit (termed Community Transit within SMART) performance indicators likely to be affected by SMARTs implementation of automated scheduling and dispatch (ASD) is schedule adherence. Schedule adherence refers to a variety of measure...

  5. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    NASA Technical Reports Server (NTRS)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  6. Advanced timeline systems

    NASA Technical Reports Server (NTRS)

    Bulfin, R. L.; Perdue, C. A.

    1994-01-01

    The Mission Planning Division of the Mission Operations Laboratory at NASA's Marshall Space Flight Center is responsible for scheduling experiment activities for space missions controlled at MSFC. In order to draw statistically relevant conclusions, all experiments must be scheduled at least once and may have repeated performances during the mission. An experiment consists of a series of steps which, when performed, provide results pertinent to the experiment's functional objective. Since these experiments require a set of resources such as crew and power, the task of creating a timeline of experiment activities for the mission is one of resource constrained scheduling. For each experiment, a computer model with detailed information of the steps involved in running the experiment, including crew requirements, processing times, and resource requirements is created. These models are then loaded into the Experiment Scheduling Program (ESP) which attempts to create a schedule which satisfies all resource constraints. ESP uses a depth-first search technique to place each experiment into a time interval, and a scoring function to evaluate the schedule. The mission planners generate several schedules and choose one with a high value of the scoring function to send through the approval process. The process of approving a mission timeline can take several months. Each timeline must meet the requirements of the scientists, the crew, and various engineering departments as well as enforce all resource restrictions. No single objective is considered in creating a timeline. The experiment scheduling problem is: given a set of experiments, place each experiment along the mission timeline so that all resource requirements and temporal constraints are met and the timeline is acceptable to all who must approve it. Much work has been done on multicriteria decision making (MCDM). When there are two criteria, schedules which perform well with respect to one criterion will often perform poorly with respect to the other. One schedule dominates another if it performs strictly better on one criterion, and no worse on the other. Clearly, dominated schedules are undesireable. A nondominated schedule can be generated by some sort of optimization problem. Generally there are two approaches: the first is a hierarchical approach while the second requires optimizing a weighting or scoring function.

  7. Characterization, performance, and prediction of a lead-acid battery under simulated electric vehicle driving requirements

    NASA Technical Reports Server (NTRS)

    Ewashinka, J. G.; Bozek, J. M.

    1981-01-01

    A state-of-the-art 6-V battery module in current use by the electric vehicle industry was tested at the NASA Lewis Research Center to determine its performance characteristics under the SAE J227a driving schedules B, C, and D. The primary objective of the tests was to determine the effects of periods of recuperation and long and short periods of electrical regeneration in improving the performance of the battery module and hence extendng the vehicle range. A secondary objective was to formulate a computer program that would predict the performance of this battery module for the above driving schedules. The results show excellent correlation between the laboratory tests and predicted results. The predicted performance compared with laboratory tests was within +2.4 to -3.7 percent for the D schedule, +0.5 to -7.1 percent for the C schedule, and better than -11.4 percent for the B schedule.

  8. Characterization, performance, and prediction of a lead-acid battery under simulated electric vehicle driving requirements

    NASA Astrophysics Data System (ADS)

    Ewashinka, J. G.; Bozek, J. M.

    1981-05-01

    A state-of-the-art 6-V battery module in current use by the electric vehicle industry was tested at the NASA Lewis Research Center to determine its performance characteristics under the SAE J227a driving schedules B, C, and D. The primary objective of the tests was to determine the effects of periods of recuperation and long and short periods of electrical regeneration in improving the performance of the battery module and hence extendng the vehicle range. A secondary objective was to formulate a computer program that would predict the performance of this battery module for the above driving schedules. The results show excellent correlation between the laboratory tests and predicted results. The predicted performance compared with laboratory tests was within +2.4 to -3.7 percent for the D schedule, +0.5 to -7.1 percent for the C schedule, and better than -11.4 percent for the B schedule.

  9. Risk mitigation process for utilization of commercial off-the-shelf (COTS) parts in CCD camera for military applications

    NASA Astrophysics Data System (ADS)

    Ahmad, Anees; Batcheldor, Scott; Cannon, Steven C.; Roberts, Thomas E.

    2002-09-01

    This paper presents the lessons learned during the design and development of a high performance cooled CCD camera for military applications utilizing common commercial off the shelf (COTS) parts. Our experience showed that concurrent evaluation and testing of high risk COTS must be performed to assess their performance over the required temperature range and other special product requirements such as fuel vapor compatibility, EMI and shock susceptibility, etc. Technical, cost and schedule risks for COTS parts must also be carefully evaluated. The customer must be involved in the selection and evaluation of such parts so that the performance limitations of the selected parts are clearly understood. It is equally important to check with vendors on the availability and obsolescence of the COTS parts being considered since the electronic components are often replaced by newer, better and cheaper models in a couple of years. In summary, this paper addresses the major benefits and risks associated with using commercial and industrial parts in military products, and suggests a risk mitigation approach to ensure a smooth development phase, and predictable performance from the end product.

  10. Systems cost/performance analysis (study 2.3). Volume 2: Systems cost/performance model. [unmanned automated payload programs and program planning

    NASA Technical Reports Server (NTRS)

    Campbell, B. H.

    1974-01-01

    A methodology which was developed for balanced designing of spacecraft subsystems and interrelates cost, performance, safety, and schedule considerations was refined. The methodology consists of a two-step process: the first step is one of selecting all hardware designs which satisfy the given performance and safety requirements, the second step is one of estimating the cost and schedule required to design, build, and operate each spacecraft design. Using this methodology to develop a systems cost/performance model allows the user of such a model to establish specific designs and the related costs and schedule. The user is able to determine the sensitivity of design, costs, and schedules to changes in requirements. The resulting systems cost performance model is described and implemented as a digital computer program.

  11. On program restructuring, scheduling, and communication for parallel processor systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, thesemore » algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.« less

  12. The Cost of Doing Business: Cost Structure of Electronic Immunization Registries

    PubMed Central

    Fontanesi, John M; Flesher, Don S; De Guire, Michelle; Lieberthal, Allan; Holcomb, Kathy

    2002-01-01

    Objective To predict the true cost of developing and maintaining an electronic immunization registry, and to set the framework for developing future cost-effective and cost-benefit analysis. Data Sources/Study Setting Primary data collected at three immunization registries located in California, accounting for 90 percent of all immunization records in registries in the state during the study period. Study Design A parametric cost analysis compared registry development and maintenance expenditures to registry performance requirements. Data Collection/Extraction Methods Data were collected at each registry through interviews, reviews of expenditure records, technical accomplishments development schedules, and immunization coverage rates. Principal Findings The cost of building immunization registries is predictable and independent of the hardware/software combination employed. The effort requires four man-years of technical effort or approximately $250,000 in 1998 dollars. Costs for maintaining a registry were approximately $5,100 per end user per three-year period. Conclusions There is a predictable cost structure for both developing and maintaining immunization registries. The cost structure can be used as a framework for examining the cost-effectiveness and cost-benefits of registries. The greatest factor effecting improvement in coverage rates was ongoing, user-based administrative investment. PMID:12479497

  13. An investigation on impacts of scheduling configurations on Mississippi biology subject area testing

    NASA Astrophysics Data System (ADS)

    Marchette, Frances Lenora

    The purpose of this mixed modal study was to compare the results of Biology Subject Area mean scores of students on a 4 x 4 block schedule, A/B block schedule, and traditional year-long schedule for 1A to 5A size schools. This study also reviewed the data to determine if minority or gender issues might influence the test results. Interviews with administrators and teachers were conducted about the type of schedule configuration they use and the influence that the schedule has on student academic performance on the Biology Subject Area Test. Additionally, this research further explored whether schedule configurations allow sufficient time for students to construct knowledge. This study is important to schools, teachers, and administrators because it can assist them in considering the impacts that different types of class schedules have on student performance and if ethnic or gender issues are influencing testing results. This study used the causal-comparative method for the quantitative portion of the study and constant comparative method for the qualitative portion to explore the relationship of school schedules on student academic achievement on the Mississippi Biology Subject Area Test. The aggregate means of selected student scores indicate that the Mississippi Biology Subject Area Test as a measure of student performance reveals no significant difference on student achievement for the three school schedule configurations. The data were adjusted for initial differences of gender, minority, and school size on the three schedule configurations. The results suggest that schools may employ various schedule configurations and expect student performance on the Mississippi Biology Subject Area Test to be unaffected. However, many areas of concern were identified in the interviews that might impact on school learning environments. These concerns relate to effective classroom management, the active involvement of students in learning, the adequacy of teacher education programs and the stress of testing on everyone involved in high-stakes testing.

  14. Some effects of 8- vs 10-hour work schedules on the test performance/alertness of air traffic control specialists.

    DOT National Transportation Integrated Search

    1995-12-01

    A 10-hour, 4-day rotating shift schedule worked by some Air Traffic Control Specialists (ATCSs) was compared to the more traditional 8-hour, 2-2-1 rapidly rotating schedule. Measures of performance and alertness were obtained from a group of 52 ATCSs...

  15. Criteria and procedures for validating biomathematical models of human performance and fatigue : procedures for analysis of work schedules.

    DOT National Transportation Integrated Search

    2013-01-01

    Each railroad covered by 49 CFR 228.407 must perform an analysis of the work schedules of its train employees who are engaged in commuter or intercity rail passenger transportation and identify those schedules that, if worked by such a train employee...

  16. Mixed Criticality Scheduling for Industrial Wireless Sensor Networks

    PubMed Central

    Jin, Xi; Xia, Changqing; Xu, Huiting; Wang, Jintao; Zeng, Peng

    2016-01-01

    Wireless sensor networks (WSNs) have been widely used in industrial systems. Their real-time performance and reliability are fundamental to industrial production. Many works have studied the two aspects, but only focus on single criticality WSNs. Mixed criticality requirements exist in many advanced applications in which different data flows have different levels of importance (or criticality). In this paper, first, we propose a scheduling algorithm, which guarantees the real-time performance and reliability requirements of data flows with different levels of criticality. The algorithm supports centralized optimization and adaptive adjustment. It is able to improve both the scheduling performance and flexibility. Then, we provide the schedulability test through rigorous theoretical analysis. We conduct extensive simulations, and the results demonstrate that the proposed scheduling algorithm and analysis significantly outperform existing ones. PMID:27589741

  17. Effect of Uncertainty on Deterministic Runway Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Malik, Waqar; Jung, Yoon C.

    2012-01-01

    Active runway scheduling involves scheduling departures for takeoffs and arrivals for runway crossing subject to numerous constraints. This paper evaluates the effect of uncertainty on a deterministic runway scheduler. The evaluation is done against a first-come- first-serve scheme. In particular, the sequence from a deterministic scheduler is frozen and the times adjusted to satisfy all separation criteria; this approach is tested against FCFS. The comparison is done for both system performance (throughput and system delay) and predictability, and varying levels of congestion are considered. The modeling of uncertainty is done in two ways: as equal uncertainty in availability at the runway as for all aircraft, and as increasing uncertainty for later aircraft. Results indicate that the deterministic approach consistently performs better than first-come-first-serve in both system performance and predictability.

  18. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  19. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiNunzio, Camillo A.; Gupta, Abhinav; Golay, Michael

    2002-11-30

    This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.

  20. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  1. 75 FR 48387 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... of the PULSe order entry workstation and to make a technical correction to the numbering of the text in the fees schedule. The PULSe workstation is a front-end order entry system designed for use with...\\ In conjunction with the launch of the PULSe workstation, the Exchange waived various fees. To...

  2. 78 FR 69079 - Midcontinent Independent System Operator, Inc.; Supplemental Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... Schedule 46. a. For step one, define the terms ``Hourly Real-Time RSG MWP'' and ``Resource CMC Real-time... RSG credits and the difference between one and the Constraint Management Charge Allocation Factor... and Headroom Need is (1) less than or equal to zero, (2) greater than or equal to the Economic...

  3. 77 FR 31411 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... program related to an incentive plan for certain Foreign Currency (``FX'') options traded on the Exchange... Rule Change to Terminate a Pilot Program Related to an Incentive Plan for Certain Foreign Currency Options Traded on the Exchange and To Make a Technical Change to the Schedule of Fees May 21, 2012...

  4. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... limited to software, files, data, and prize schedules. (2) Downloads must use secure methodologies that... date of the completion of the download; (iii) The Class II gaming system components to which software was downloaded; (iv) The version(s) of download package and any software downloaded. Logging of the...

  5. 25 CFR 547.12 - What are the minimum technical standards for downloading on a Class II gaming system?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... limited to software, files, data, and prize schedules. (2) Downloads must use secure methodologies that... date of the completion of the download; (iii) The Class II gaming system components to which software was downloaded; (iv) The version(s) of download package and any software downloaded. Logging of the...

  6. 75 FR 57947 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... auction pace that reasonably balances speed with the bidders' need to study round results and adjust their... and other factors. The Bureaus seek comment on this proposal. Commenters may wish to address the role...

  7. 77 FR 60690 - Auction of FM Broadcast Construction Permits Scheduled for March 26, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... balances speed with the bidders' need to study round results and adjust their bidding strategies. The... number of rounds per day, depending upon bidding activity and other factors. The Bureaus seek comment on...

  8. 78 FR 4883 - Excepted Service; Consolidated Listing of Schedules A, B, and C Exceptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ...) Professional and technical positions in grades GS-9 through 15 on the staff of the Council. (d)-(f) (Reserved... and Technology Policy-- (1) Thirty positions of Senior Policy Analyst, GS-15; Policy Analyst, GS-11/14... Secretary for Management. (2) (Reserved) (b)-(f) (Reserved) (g) Bureau of Population, Refugees, and...

  9. 78 FR 63500 - Bureau of Labor Statistics Technical Advisory Committee; Notice of Meeting and Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... meet on Friday, November 8, 2013. The meeting will be held in the Postal Square Building, 2... held in rooms 1 and 2 of the Postal Square Building Conference Center. The schedule and agenda for the.... Individuals who require special accommodations should contact Ms. Fieldhouse at least two days prior to the...

  10. NREL Provides Technical Analysis for Hawaiian Electric Companies' Power

    Science.gov Websites

    ) to upgrade its five island power grids. The plan calls for achieving a 48% renewable portfolio standard (RPS) by 2020 and 100% by 2040, five years ahead of schedule. Aerial view of wind turbines on Maui NREL research on advanced inverters and renewable resource potential in Hawaii helped inform the PSIP

  11. Summer-Jobs-for-Youth Program Guide. How to Develop and Manage a Summer Youth Jobs Program. A Technical Assistance Guide.

    ERIC Educational Resources Information Center

    National Alliance of Business, Inc., Washington, DC.

    This guide offers a practical approach for operating summer youth employment programs that involves cooperation among private businesses and local organizations. A timetable provides a month-by-month schedule. Seven sections discuss management responsibilities. Program Planning covers scope, goals, and coordination. Program Management addresses…

  12. 77 FR 35731 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-14

    .... However, since submitting the Amendment, the Exchange has learned that a number of technical and billing... remove from the Fees Schedule the language added by the Amendment. The Exchange may, at some point in the future, re-add such language (or similar language) when such issues have been resolved. \\3\\ See...

  13. Giving Students Extra Support to Meet Standards in Challenging Academic and Career Courses.

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2010

    2010-01-01

    Successful schools at all levels provide extra-help strategies to assist students in meeting high standards in both academic and career/technical courses. Some schools design a flexible schedule and offer virtual learning opportunities to enable at-risk students to complete high school. Middle grades schools can provide an accelerated curriculum…

  14. The Determination of Sugars in Dairy Products: Development of a New Standard Method for the International Dairy Federation and the Internal Organization for Standardization.

    PubMed

    Sanders, Peter; Ernste-Nota, Veronica; Visser, Klaas; van Soest, Jeroen; Brunt, Kommer

    2017-09-01

    A method using high-performance anion-exchange chromatography (HPAEC) with a pulsed amperometric detector (PAD) for the determination of mono- and disaccharides is described. The method was accepted by the International Dairy Federation and the Internal Organization for Standardization as a new work item for the determination of sugars in dairy matrixes, and the Milk and Milk Products technical committee of ISO/TC 34/SC 5 accepted the topic "Milk and milk products - Determination of the sugar contents - High-performance anion-exchange chromatographic method (HPAEC-PAD)" as a new work item. The proposed method consists of an aqueous ethanol extraction of the sugars in the dairy sample, followed by clarification with Carrez I and II reagents. The clarified filtrate is diluted and then directly introduced in the HPAEC-PAD system for quantification of the sugars. A single-laboratory validation of the proposed method has been scheduled for spring 2017.

  15. Optimal planning and design of a renewable energy based supply system for microgrids

    DOE PAGES

    Hafez, Omar; Bhattacharya, Kankar

    2012-03-03

    This paper presents a technique for optimal planning and design of hybrid renewable energy systems for microgrid applications. The Distributed Energy Resources Customer Adoption Model (DER-CAM) is used to determine the optimal size and type of distributed energy resources (DERs) and their operating schedules for a sample utility distribution system. Using the DER-CAM results, an evaluation is performed to evaluate the electrical performance of the distribution circuit if the DERs selected by the DER-CAM optimization analyses are incorporated. Results of analyses regarding the economic benefits of utilizing the optimal locations identified for the selected DER within the system are alsomore » presented. The actual Brookhaven National Laboratory (BNL) campus electrical network is used as an example to show the effectiveness of this approach. The results show that these technical and economic analyses of hybrid renewable energy systems are essential for the efficient utilization of renewable energy resources for microgird applications.« less

  16. Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, A. A.; Peeler, D. K.; Kim, D. S.

    2015-11-23

    The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, keymore » product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule.« less

  17. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  18. Alphabus Mechanical Validation Plan and Test Campaign

    NASA Astrophysics Data System (ADS)

    Calvisi, G.; Bonnet, D.; Belliol, P.; Lodereau, P.; Redoundo, R.

    2012-07-01

    A joint team of the two leading European satellite companies (Astrium and Thales Alenia Space) worked with the support of ESA and CNES to define a product line able to efficiently address the upper segment of communications satellites : Alphabus Starting in 2009 and up to 2011 the mechanical validation of the Alphabus platform has been obtained thanks to static tests performed on dedicated static model and to environmental test performed on the first satellite based on Alphabus: Alphasat I-XL. The mechanical validation of the Alphabus platform presented an excellent opportunity to improve the validation and qualification process, with respect to static, sine vibrations, acoustic and L/V shock environment, minimizing recurrent cost of manufacturing, integration and testing. A main driver on mechanical testing is that mechanical acceptance testing at satellite level will be performed with empty tanks due to technical constraints (limitation of existing vibration devices) and programmatic advantages (test risk reduction, test schedule minimization). In this paper the impacts that such testing logic have on validation plan are briefly recalled and its actual application for Alphasat PFM mechanical test campaign is detailed.

  19. The role of the China Experts Advisory Committee on Immunization Program.

    PubMed

    Zheng, Jingshan; Zhou, Yuqing; Wang, Huaqing; Liang, Xiaofeng

    2010-04-19

    The Experts Advisory Committee on Immunization Program (EACIP) of China was founded in 1982, and currently consists of 33 experts in immunization and related fields, selected by the Ministry of Health, to provide advice and guidance on the control of vaccine-preventable diseases. The main tasks of the EACIP are to advise on the national immunization schedule, to participate in the drafting and review of technical documents, and to participate in field supervision and staff training. In 2007, the EACIP used evidence-based methods to formulate a revised national immunization schedule. The EACIP has played and is playing an increasingly important role in guiding immunization policy in China. Copyright © 2010. Published by Elsevier Ltd.

  20. Yes, there was a moon race

    NASA Technical Reports Server (NTRS)

    Oberg, James E.

    1990-01-01

    Examination of newly disclosed evidence confirms that the Soviets were indeed striving to reach the moon before the U.S. in 1969. It is noted that a Soviet unmanned lunar probe crashed on the moon's surface only hours before the U.S. Apollo landing. Now confirmed openly are moon-exploration schedules that were competitive with Apollo plans, the names and histories of Soviet lunar boosters and landers, identities of the lunar cosmonauts; and even photos of manned lunar craft are available. Additional details on the troubled moon-probe program are presented: technical problems, continuous changes in goals, schedules, and planning, vehicle and personnel disasters, transfer of authority between ministries, and political power struggles in the scientific community.

  1. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  2. A time scheduling model of logistics service supply chain based on the customer order decoupling point: a perspective from the constant service operation time.

    PubMed

    Liu, Weihua; Yang, Yi; Xu, Haitao; Liu, Xiaoyan; Wang, Yijia; Liang, Zhicheng

    2014-01-01

    In mass customization logistics service, reasonable scheduling of the logistics service supply chain (LSSC), especially time scheduling, is benefit to increase its competitiveness. Therefore, the effect of a customer order decoupling point (CODP) on the time scheduling performance should be considered. To minimize the total order operation cost of the LSSC, minimize the difference between the expected and actual time of completing the service orders, and maximize the satisfaction of functional logistics service providers, this study establishes an LSSC time scheduling model based on the CODP. Matlab 7.8 software is used in the numerical analysis for a specific example. Results show that the order completion time of the LSSC can be delayed or be ahead of schedule but cannot be infinitely advanced or infinitely delayed. Obtaining the optimal comprehensive performance can be effective if the expected order completion time is appropriately delayed. The increase in supply chain comprehensive performance caused by the increase in the relationship coefficient of logistics service integrator (LSI) is limited. The relative concern degree of LSI on cost and service delivery punctuality leads to not only changes in CODP but also to those in the scheduling performance of the LSSC.

  3. A Time Scheduling Model of Logistics Service Supply Chain Based on the Customer Order Decoupling Point: A Perspective from the Constant Service Operation Time

    PubMed Central

    Yang, Yi; Xu, Haitao; Liu, Xiaoyan; Wang, Yijia; Liang, Zhicheng

    2014-01-01

    In mass customization logistics service, reasonable scheduling of the logistics service supply chain (LSSC), especially time scheduling, is benefit to increase its competitiveness. Therefore, the effect of a customer order decoupling point (CODP) on the time scheduling performance should be considered. To minimize the total order operation cost of the LSSC, minimize the difference between the expected and actual time of completing the service orders, and maximize the satisfaction of functional logistics service providers, this study establishes an LSSC time scheduling model based on the CODP. Matlab 7.8 software is used in the numerical analysis for a specific example. Results show that the order completion time of the LSSC can be delayed or be ahead of schedule but cannot be infinitely advanced or infinitely delayed. Obtaining the optimal comprehensive performance can be effective if the expected order completion time is appropriately delayed. The increase in supply chain comprehensive performance caused by the increase in the relationship coefficient of logistics service integrator (LSI) is limited. The relative concern degree of LSI on cost and service delivery punctuality leads to not only changes in CODP but also to those in the scheduling performance of the LSSC. PMID:24715818

  4. Effect of Reinforcer Magnitude on Performance Maintained by Progressive-Ratio Schedules

    ERIC Educational Resources Information Center

    Rickard, J. F.; Body, S.; Zhang, Z.; Bradshaw, C. M.; Szabadi, E.

    2009-01-01

    This experiment examined the relationship between reinforcer magnitude and quantitative measures of performance on progressive-ratio schedules. Fifteen rats were trained under a progressive-ratio schedule in seven phases of the experiment in which the volume of a 0.6-M sucrose solution reinforcer was varied within the range 6-300 microliters.…

  5. Vehicle and driver scheduling for public transit.

    DOT National Transportation Integrated Search

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  6. Performance comparison of some evolutionary algorithms on job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Mishra, S. K.; Rao, C. S. P.

    2016-09-01

    Job Shop Scheduling as a state space search problem belonging to NP-hard category due to its complexity and combinational explosion of states. Several naturally inspire evolutionary methods have been developed to solve Job Shop Scheduling Problems. In this paper the evolutionary methods namely Particles Swarm Optimization, Artificial Intelligence, Invasive Weed Optimization, Bacterial Foraging Optimization, Music Based Harmony Search Algorithms are applied and find tuned to model and solve Job Shop Scheduling Problems. To compare about 250 Bench Mark instances have been used to evaluate the performance of these algorithms. The capabilities of each these algorithms in solving Job Shop Scheduling Problems are outlined.

  7. Critical success factors in implementing an e-rostering system in a healthcare organisation.

    PubMed

    Soomro, Zahoor A; Ahmed, Javed; Muhammad, Raza; Hayes, Dawn; Shah, Mahmood H

    2017-01-01

    Effective and efficient staff scheduling has always been a challenging issue, especially in health service organisations. Both the extremes of staff shortage and overage have an adverse impact on the performance of healthcare organisations. In this case, an electronic and systematic staff scheduling (e-rostering) system is the often seen as the best solution. Unless an organisation has an effective implementation of such a system, possible cost savings, efficiency, and benefits could be minimal. This study is aimed to research key success factors for the successful effective implementation of an electronic rostering system, especially at healthcare organisations. A case study research method was used to evaluate critical success factors for effectively implementing an e-rostering system. The data were collected through interviews and observations. The findings indicate that technical support, an effective policy, leadership, clear goals and objectives, gradual change, evidence of the advantages of the new system, senior management support, and effective communication are the critical success factors in implementing an e-rostering system in healthcare organisations. Prior to this study, no such factors were grounded in the current context, so this research would help in bridging the gap towards effective implementation of an e-rostering system in the healthcare sector. This research also suggests future studies in different cultures and contexts.

  8. Physical and technical demands of elite beach volleyball according to playing position and gender.

    PubMed

    Natali, Simone; Ferioli, Davide; LA Torre, Antonio; Bonato, Matteo

    2017-12-01

    Beach volleyball is a team sport played by two teams of two players on a sand court divided by a net. To date, research has mainly focused on male beach volleyball players. Therefore, the aim of this study was to assess work-rest ratio and physical actions between males and females according to their role. Forty-two elite beach volley players (24 males and 18 females) were filmed during 12 beach volleyball matches of the Swatch Major Series 2016 of the beach volleyball World Tour in Poreč in (Croatia). Duration of point rallies, work rest ratio and the number of jumps and hits performed by the players according to their role (blockers and defenders) were recorded. Twenty-one teams (12 males and 9 females) were recorded during a total of 12 matches comprising 11 sets for males and 9 sets for females. Males scored a total of 428 points whereas females scored 440 points. Un-paired t-test did not show significant differences between males and females. Two-way analysis of variance showed a significant difference in the jumps performed between blockers and defenders and not between males and females. No significant differences in the other variables were detected. The present study provides new inside into female beach volleyball matches, giving preliminary normative data. Technical and physical aspects of beach volleyball performance appear not to be influenced by gender and to be only partially different according to playing positions. These results should be considered during the daily training scheduling.

  9. Virtual Reality Simulation for the Operating Room

    PubMed Central

    Gallagher, Anthony G.; Ritter, E Matt; Champion, Howard; Higgins, Gerald; Fried, Marvin P.; Moses, Gerald; Smith, C Daniel; Satava, Richard M.

    2005-01-01

    Summary Background Data: To inform surgeons about the practical issues to be considered for successful integration of virtual reality simulation into a surgical training program. The learning and practice of minimally invasive surgery (MIS) makes unique demands on surgical training programs. A decade ago Satava proposed virtual reality (VR) surgical simulation as a solution for this problem. Only recently have robust scientific studies supported that vision Methods: A review of the surgical education, human-factor, and psychology literature to identify important factors which will impinge on the successful integration of VR training into a surgical training program. Results: VR is more likely to be successful if it is systematically integrated into a well-thought-out education and training program which objectively assesses technical skills improvement proximate to the learning experience. Validated performance metrics should be relevant to the surgical task being trained but in general will require trainees to reach an objectively determined proficiency criterion, based on tightly defined metrics and perform at this level consistently. VR training is more likely to be successful if the training schedule takes place on an interval basis rather than massed into a short period of extensive practice. High-fidelity VR simulations will confer the greatest skills transfer to the in vivo surgical situation, but less expensive VR trainers will also lead to considerably improved skills generalizations. Conclusions: VR for improved performance of MIS is now a reality. However, VR is only a training tool that must be thoughtfully introduced into a surgical training curriculum for it to successfully improve surgical technical skills. PMID:15650649

  10. Definition of technology development missions for early Space Station satellite servicing. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    Cable, D. A.; Diewald, C. A.; Hills, T. C.; Parmentier, T. J.; Spencer, R. A.; Stone, G. E.

    1984-01-01

    Volume 2 contains the Technical Report of the approach and results of the Phase 2 study. The phase 2 servicing study was initiated in June 1983, and is being reported in this document. The scope of the contract was to: (1) define in detail five selected technology development missions (TDM); (2) conduct a design requirement analysis to refine definitions of satellite servicing requirements at the space station; and (3) develop a technology plan that would identify and schedule prerequisite precursor technology development, associated. STS flight experiments and space station experiments needed to provide onorbit validation of the evolving technology.

  11. Advanced Numerical Techniques of Performance Evaluation. Volume 1

    DTIC Science & Technology

    1990-06-01

    system scheduling3thread. The scheduling thread then runs any other ready thread that can be found. A thread can only sleep or switch out on itself...Polychronopoulos and D.J. Kuck. Guided Self- Scheduling : A Practical Scheduling Scheme for Parallel Supercomputers. IEEE Transactions on Computers C...Kuck 1987] C.D. Polychronopoulos and D.J. Kuck. Guided Self- Scheduling : A Practical Scheduling Scheme for Parallel Supercomputers. IEEE Trans. on Comp

  12. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  13. Integrating Microscopic Analysis into Existing Quality Assurance Processes

    NASA Astrophysics Data System (ADS)

    Frühberger, Peter; Stephan, Thomas; Beyerer, Jürgen

    When technical goods, like mainboards and other electronic components, are produced, quality assurance (QA) is very important. To achieve this goal, different optical microscopes can be used to analyze a variety of specimen to gain comprehensive information by combining the acquired sensor data. In many industrial processes, cameras are used to examine these technical goods. Those cameras can analyze complete boards at once and offer a high level of accuracy when used for completeness checks. When small defects, e.g. soldered points, need to be examined in detail, those wide area cameras are limited. Microscopes with large magnification need to be used to analyze those critical areas. But microscopes alone cannot fulfill this task within a limited time schedule, because microscopic analysis of complete motherboards of a certain size is time demanding. Microscopes are limited concerning their depth of field and depth of focus, which is why additional components like XY moving tables need to be used to examine the complete surface. Yet today's industrial production quality standards require a 100 % control of the soldered components within a given time schedule. This level of quality, while keeping inspection time low, can only be achieved when combining multiple inspection devices in an optimized manner. This paper presents results and methods of combining industrial cameras with microscopy instrumenting a classificatory based approach intending to keep already deployed QA processes in place but extending them with the purpose of increasing the quality level of the produced technical goods while maintaining high throughput.

  14. Learning to live on a Mars day: fatigue countermeasures during the Phoenix Mars Lander mission.

    PubMed

    Barger, Laura K; Sullivan, Jason P; Vincent, Andrea S; Fiedler, Edna R; McKenna, Laurence M; Flynn-Evans, Erin E; Gilliland, Kirby; Sipes, Walter E; Smith, Peter H; Brainard, George C; Lockley, Steven W

    2012-10-01

    To interact with the robotic Phoenix Mars Lander (PML) spacecraft, mission personnel were required to work on a Mars day (24.65 h) for 78 days. This alien schedule presents a challenge to Earth-bound circadian physiology and a potential risk to workplace performance and safety. We evaluated the acceptability, feasibility, and effectiveness of a fatigue management program to facilitate synchronization with the Mars day and alleviate circadian misalignment, sleep loss, and fatigue. Operational field study. PML Science Operations Center. Scientific and technical personnel supporting PML mission. Sleep and fatigue education was offered to all support personnel. A subset (n = 19) were offered a short-wavelength (blue) light panel to aid alertness and mitigate/reduce circadian desynchrony. They were assessed using a daily sleep/work diary, continuous wrist actigraphy, and regular performance tests. Subjects also completed 48-h urine collections biweekly for assessment of the circadian 6-sulphatoxymelatonin rhythm. Most participants (87%) exhibited a circadian period consistent with adaptation to a Mars day. When synchronized, main sleep duration was 5.98 ± 0.94 h, but fell to 4.91 ± 1.22 h when misaligned (P < 0.001). Self-reported levels of fatigue and sleepiness also significantly increased when work was scheduled at an inappropriate circadian phase (P < 0.001). Prolonged wakefulness (≥ 21 h) was associated with a decline in performance and alertness (P < 0.03 and P < 0.0001, respectively). The ability of the participants to adapt successfully to the Mars day suggests that future missions should utilize a similar circadian rhythm and fatigue management program to reduce the risk of sleepiness-related errors that jeopardize personnel safety and health during critical missions.

  15. Role of National Immunization Technical Advisory Group on improvement of immunization programmes in the Islamic Republic of Iran.

    PubMed

    Zahraei, Seyed Mohsen; Marandi, Alireza; Sadrizadeh, Bijan; Gouya, Mehdi Mohammad; Rezaei, Parviz; Vazirian, Parviz; Yaghini, Fatheme

    2010-04-19

    The National Immunization Technical Advisory Group (NITAG) was established in Iran in 1982 and has made many important technical recommendations (e.g., regarding polio eradication, introduction of new vaccines, organizing special studies) that have contributed to a dramatic decline in vaccine preventable disease burden. The NITAG consists of experts from the Ministry of Health and Medical Education (MOHME), vaccine manufacturers, and medical universities with national Expanded Program of Immunization (EPI) staff serving as the secretariat. It is not completely independent from MOHME or EPI. It meets on a quarterly basis, and publishes national guidelines and immunization schedules that are updated regularly. Although primarily an advisory body, representation from MOHME members, including the EPI manager, ensures almost universal implementation of NITAG recommendations. Copyright © 2010 Elsevier Ltd. All rights reserved.

  16. Designing a fuzzy scheduler for hard real-time systems

    NASA Technical Reports Server (NTRS)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  17. Advanced teleprocessing systems

    NASA Astrophysics Data System (ADS)

    Kleinrock, L.; Gerla, M.

    1982-09-01

    This Annual Technical Report covers research covering the period from October 1, 1981 to September 30, 1982. This contract has three primary designated research areas: packet radio systems, resource sharing and allocation, and distributed processing and control. This report contains abstracts of publications which summarize research results in these areas followed by the main body of the report which is devoted to a study of channel access protocols that are executed by the nodes of a network to schedule their transmissions on multi-access broadcast channel. In particular the main body consists of a Ph.D. dissertation, Channel Access Protocols for Multi-Hop Broadcast Packet Radio Networks. This work discusses some new channel access protocols useful for mobile radio networks. Included is an analysis of slotted ALOHA and some tight bounds on the performance of all possible protocols in a mobile environment.

  18. Performance of Extended Local Clustering Organization (LCO) for Large Scale Job-Shop Scheduling Problem (JSP)

    NASA Astrophysics Data System (ADS)

    Konno, Yohko; Suzuki, Keiji

    This paper describes an approach to development of a solution algorithm of a general-purpose for large scale problems using “Local Clustering Organization (LCO)” as a new solution for Job-shop scheduling problem (JSP). Using a performance effective large scale scheduling in the study of usual LCO, a solving JSP keep stability induced better solution is examined. In this study for an improvement of a performance of a solution for JSP, processes to a optimization by LCO is examined, and a scheduling solution-structure is extended to a new solution-structure based on machine-division. A solving method introduced into effective local clustering for the solution-structure is proposed as an extended LCO. An extended LCO has an algorithm which improves scheduling evaluation efficiently by clustering of parallel search which extends over plural machines. A result verified by an application of extended LCO on various scale of problems proved to conduce to minimizing make-span and improving on the stable performance.

  19. Analysis of sequencing and scheduling methods for arrival traffic

    NASA Technical Reports Server (NTRS)

    Neuman, Frank; Erzberger, Heinz

    1990-01-01

    The air traffic control subsystem that performs scheduling is discussed. The function of the scheduling algorithms is to plan automatically the most efficient landing order and to assign optimally spaced landing times to all arrivals. Several important scheduling algorithms are described and the statistical performance of the scheduling algorithms is examined. Scheduling brings order to an arrival sequence for aircraft. First-come-first-served scheduling (FCFS) establishes a fair order, based on estimated times of arrival, and determines proper separations. Because of the randomness of the traffic, gaps will remain in the scheduled sequence of aircraft. These gaps are filled, or partially filled, by time-advancing the leading aircraft after a gap while still preserving the FCFS order. Tightly scheduled groups of aircraft remain with a mix of heavy and large aircraft. Separation requirements differ for different types of aircraft trailing each other. Advantage is taken of this fact through mild reordering of the traffic, thus shortening the groups and reducing average delays. Actual delays for different samples with the same statistical parameters vary widely, especially for heavy traffic.

  20. The Effects of Smoking Schedules on Cessation Outcome: Can We Improve on Common Methods of Gradual and Abrupt Nicotine Withdrawal?

    ERIC Educational Resources Information Center

    Cinciripini, Paul M.; And Others

    1995-01-01

    Participants (n=128) quit smoking on a target date, after a 3-week period of either scheduled reduced smoking, nonscheduled reduced smoking, scheduled nonreduced smoking, or nonscheduled, nonreduced smoking. After one year, the scheduled reduced group performed the best, and the nonscheduled reduced group the worst. Both scheduled groups performed…

  1. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  2. Diverse task scheduling for individualized requirements in cloud manufacturing

    NASA Astrophysics Data System (ADS)

    Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida

    2018-03-01

    Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.

  3. A meta-heuristic method for solving scheduling problem: crow search algorithm

    NASA Astrophysics Data System (ADS)

    Adhi, Antono; Santosa, Budi; Siswanto, Nurhadi

    2018-04-01

    Scheduling is one of the most important processes in an industry both in manufacturingand services. The scheduling process is the process of selecting resources to perform an operation on tasks. Resources can be machines, peoples, tasks, jobs or operations.. The selection of optimum sequence of jobs from a permutation is an essential issue in every research in scheduling problem. Optimum sequence becomes optimum solution to resolve scheduling problem. Scheduling problem becomes NP-hard problem since the number of job in the sequence is more than normal number can be processed by exact algorithm. In order to obtain optimum results, it needs a method with capability to solve complex scheduling problems in an acceptable time. Meta-heuristic is a method usually used to solve scheduling problem. The recently published method called Crow Search Algorithm (CSA) is adopted in this research to solve scheduling problem. CSA is an evolutionary meta-heuristic method which is based on the behavior in flocks of crow. The calculation result of CSA for solving scheduling problem is compared with other algorithms. From the comparison, it is found that CSA has better performance in term of optimum solution and time calculation than other algorithms.

  4. A Unified Model of Performance: Validation of its Predictions across Different Sleep/Wake Schedules

    PubMed Central

    Ramakrishnan, Sridhar; Wesensten, Nancy J.; Balkin, Thomas J.; Reifman, Jaques

    2016-01-01

    Study Objectives: Historically, mathematical models of human neurobehavioral performance developed on data from one sleep study were limited to predicting performance in similar studies, restricting their practical utility. We recently developed a unified model of performance (UMP) to predict the effects of the continuum of sleep loss—from chronic sleep restriction (CSR) to total sleep deprivation (TSD) challenges—and validated it using data from two studies of one laboratory. Here, we significantly extended this effort by validating the UMP predictions across a wide range of sleep/wake schedules from different studies and laboratories. Methods: We developed the UMP on psychomotor vigilance task (PVT) lapse data from one study encompassing four different CSR conditions (7 d of 3, 5, 7, and 9 h of sleep/night), and predicted performance in five other studies (from four laboratories), including different combinations of TSD (40 to 88 h), CSR (2 to 6 h of sleep/night), control (8 to 10 h of sleep/night), and nap (nocturnal and diurnal) schedules. Results: The UMP accurately predicted PVT performance trends across 14 different sleep/wake conditions, yielding average prediction errors between 7% and 36%, with the predictions lying within 2 standard errors of the measured data 87% of the time. In addition, the UMP accurately predicted performance impairment (average error of 15%) for schedules (TSD and naps) not used in model development. Conclusions: The unified model of performance can be used as a tool to help design sleep/wake schedules to optimize the extent and duration of neurobehavioral performance and to accelerate recovery after sleep loss. Citation: Ramakrishnan S, Wesensten NJ, Balkin TJ, Reifman J. A unified model of performance: validation of its predictions across different sleep/wake schedules. SLEEP 2016;39(1):249–262. PMID:26518594

  5. Arc Welding-Pipe, 3-25. Military Curriculum Materials for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This instructor guide and text for a secondary-postsecondary level course in arc welding-pipe comprise one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. Purpose of the course is to teach students to weld 5-inch mild steel schedule 80 pipe,…

  6. Missile Defense: Actions Needed to Improve Transparency and Accountability

    DTIC Science & Technology

    2011-04-13

    suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway...Established resource, schedule, test, operational capacity, technical, and contract baselines for several missile defense systems. It reported...Europe as well as the Ground-based Midcourse Defense system. View GAO-11-555T or key components. For more information, contact Cristina T

  7. Defense Acquisitions: Future Aerostat and Airship Investment Decisions Drive Oversight and Coordination Needs

    DTIC Science & Technology

    2012-10-01

    earlier, LEMV experienced schedule delays of at least 10 months, largely rooted in technical, design, and engineering problems in scaling up the airship ...had informal coordination with the Blue Devil Block 2 effort in the past. For example, originally both airships had several diesel engine ...DEFENSE ACQUISITIONS Future Aerostat and Airship Investment Decisions Drive Oversight and Coordination Needs

  8. P-8A Poseidon Multi Mission Maritime Aircraft (P-8A)

    DTIC Science & Technology

    2015-12-01

    focus also includes procurement of depot and intermediate level maintenance capabilities, full scale fatigue testing, and continued integration and... Level Confidence Level of cost estimate for current APB: 50% The current APB cost estimate provided sufficient resources to execute the program under...normal conditions, encountering average levels of technical, schedule, and programmatic risk and external interference. It was consistent with

  9. Final Technical Report for earmark project "Atmospheric Science Program at the University of Louisville"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dowling, Timothy Edward

    2014-02-11

    We have completed a 3-year project to enhance the atmospheric science program at the University of Louisville, KY (est. 2008). The goals were to complete an undergraduate atmospheric science laboratory (Year 1) and to hire and support an assistant professor (Years 2 and 3). Both these goals were met on schedule, and slightly under budget.

  10. Program control for mission success

    NASA Technical Reports Server (NTRS)

    Longanecker, G. W.

    1994-01-01

    This article suggests that in order to be able to exercise control over a particular program, the program itself must be controllable. A controllable program therefore, according to the author, is one that has been properly scoped technically, realistically scheduled, and adequately budgeted. The article delves indepth into each of the above aspects of a controllable program and discusses both the pros and cons of each.

  11. DCERP Annual Technical Report II

    DTIC Science & Technology

    2009-05-01

    information among the various DCERP partners . Research and monitoring activities during Phase II of DCERP are currently planned for 4 years (until...this information to improve scheduling of amphibious maneuvers in the NRE. Preliminary analysis of MCBCL air quality data indicated an increasing...2008 at the three MCBCL sites exceeded current National Ambient Air Quality Standards. Experimental results show that salt marshes bordering the

  12. Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and Reference Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.

    1994-12-22

    The Compliance Plan Volume provides overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) and contains procedures to establish milestones to be enforced under the Order. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume and is provided for informational purposes only.

  13. Comparisons of some large scientific computers

    NASA Technical Reports Server (NTRS)

    Credeur, K. R.

    1981-01-01

    In 1975, the National Aeronautics and Space Administration (NASA) began studies to assess the technical and economic feasibility of developing a computer having sustained computational speed of one billion floating point operations per second and a working memory of at least 240 million words. Such a powerful computer would allow computational aerodynamics to play a major role in aeronautical design and advanced fluid dynamics research. Based on favorable results from these studies, NASA proceeded with developmental plans. The computer was named the Numerical Aerodynamic Simulator (NAS). To help insure that the estimated cost, schedule, and technical scope were realistic, a brief study was made of past large scientific computers. Large discrepancies between inception and operation in scope, cost, or schedule were studied so that they could be minimized with NASA's proposed new compter. The main computers studied were the ILLIAC IV, STAR 100, Parallel Element Processor Ensemble (PEPE), and Shuttle Mission Simulator (SMS) computer. Comparison data on memory and speed were also obtained on the IBM 650, 704, 7090, 360-50, 360-67, 360-91, and 370-195; the CDC 6400, 6600, 7600, CYBER 203, and CYBER 205; CRAY 1; and the Advanced Scientific Computer (ASC). A few lessons learned conclude the report.

  14. Bridging the Divide between Safety and Risk Management for your Project or Program

    NASA Technical Reports Server (NTRS)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  15. KENNEDY SPACE CENTER, FLA. - The STS-114 crew stands underneath Discovery in the Orbiter Processing Facility. From left are Mission Specialist Stephen Robinson, Pilot James Kelly, Mission Specialist Charles Camarda, astronaut John Young, Commander Eileen Collins and Mission Specialists Andrew Thomas, Wendy Lawrence and Soichi Noguchi, who is with the Japanese Aerospace and Exploration Agency. Young is associate director, Technical, at Johnson Space Center. The crew is spending time becoming familiar with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.

    NASA Image and Video Library

    2004-03-05

    KENNEDY SPACE CENTER, FLA. - The STS-114 crew stands underneath Discovery in the Orbiter Processing Facility. From left are Mission Specialist Stephen Robinson, Pilot James Kelly, Mission Specialist Charles Camarda, astronaut John Young, Commander Eileen Collins and Mission Specialists Andrew Thomas, Wendy Lawrence and Soichi Noguchi, who is with the Japanese Aerospace and Exploration Agency. Young is associate director, Technical, at Johnson Space Center. The crew is spending time becoming familiar with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.

  16. KENNEDY SPACE CENTER, FLA. - - In the Orbiter Processing Facility, STS-114 Mission Specialists Andrew Thomas, Soichi Noguchi and Charles Camarda greet astronaut John Young (far right), who flew on the first flight of Space Shuttle Columbia with Robert Crippen. Behind Camarda is Pilot James Kelly. Young is associate director, Technical, at Johnson Space Center. Noguchi represents the Japanese Aerospace and Exploration Agency. The STS-114 crew is spending time becoming familiar with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.

    NASA Image and Video Library

    2004-03-05

    KENNEDY SPACE CENTER, FLA. - - In the Orbiter Processing Facility, STS-114 Mission Specialists Andrew Thomas, Soichi Noguchi and Charles Camarda greet astronaut John Young (far right), who flew on the first flight of Space Shuttle Columbia with Robert Crippen. Behind Camarda is Pilot James Kelly. Young is associate director, Technical, at Johnson Space Center. Noguchi represents the Japanese Aerospace and Exploration Agency. The STS-114 crew is spending time becoming familiar with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.

  17. 2B-Alert Web: An Open-Access Tool for Predicting the Effects of Sleep/Wake Schedules and Caffeine Consumption on Neurobehavioral Performance.

    PubMed

    Reifman, Jaques; Kumar, Kamal; Wesensten, Nancy J; Tountas, Nikolaos A; Balkin, Thomas J; Ramakrishnan, Sridhar

    2016-12-01

    Computational tools that predict the effects of daily sleep/wake amounts on neurobehavioral performance are critical components of fatigue management systems, allowing for the identification of periods during which individuals are at increased risk for performance errors. However, none of the existing computational tools is publicly available, and the commercially available tools do not account for the beneficial effects of caffeine on performance, limiting their practical utility. Here, we introduce 2B-Alert Web, an open-access tool for predicting neurobehavioral performance, which accounts for the effects of sleep/wake schedules, time of day, and caffeine consumption, while incorporating the latest scientific findings in sleep restriction, sleep extension, and recovery sleep. We combined our validated Unified Model of Performance and our validated caffeine model to form a single, integrated modeling framework instantiated as a Web-enabled tool. 2B-Alert Web allows users to input daily sleep/wake schedules and caffeine consumption (dosage and time) to obtain group-average predictions of neurobehavioral performance based on psychomotor vigilance tasks. 2B-Alert Web is accessible at: https://2b-alert-web.bhsai.org. The 2B-Alert Web tool allows users to obtain predictions for mean response time, mean reciprocal response time, and number of lapses. The graphing tool allows for simultaneous display of up to seven different sleep/wake and caffeine schedules. The schedules and corresponding predicted outputs can be saved as a Microsoft Excel file; the corresponding plots can be saved as an image file. The schedules and predictions are erased when the user logs off, thereby maintaining privacy and confidentiality. The publicly accessible 2B-Alert Web tool is available for operators, schedulers, and neurobehavioral scientists as well as the general public to determine the impact of any given sleep/wake schedule, caffeine consumption, and time of day on performance of a group of individuals. This evidence-based tool can be used as a decision aid to design effective work schedules, guide the design of future sleep restriction and caffeine studies, and increase public awareness of the effects of sleep amounts, time of day, and caffeine on alertness. © 2016 Associated Professional Sleep Societies, LLC.

  18. SIRTF Science Operations System Design

    NASA Technical Reports Server (NTRS)

    Green, William

    1999-01-01

    SIRTF Science Operations System Design William B. Green Manager, SIRTF Science Center California Institute of Technology M/S 310-6 1200 E. California Blvd., Pasadena CA 91125 (626) 395 8572 Fax (626) 568 0673 bgreen@ipac.caltech.edu. The Space Infrared Telescope Facility (SIRTF) will be launched in December 2001, and perform an extended series of science observations at wavelengths ranging from 20 to 160 microns for five years or more. The California Institute of Technology has been selected as the home for the SIRTF Science Center (SSC). The SSC will be responsible for evaluating and selecting observation proposals, providing technical support to the science community, performing mission planning and science observation scheduling activities, instrument calibration during operations and instrument health monitoring, production of archival quality data products, and management of science research grants. The science payload consists of three instruments delivered by instrument Principal Investigators located at University of Arizona, Cornell, and Harvard Smithsonian Astrophysical Observatory. The SSC is responsible for design, development, and operation of the Science Operations System (SOS) which will support the functions assigned to the SSC by NASA. The SIRTF spacecraft, mission profile, and science instrument design have undergone almost ten years of refinement. SIRTF development and operations activities are highly cost constrained. The cost constraints have impacted the design of the SOS in several ways. The Science Operations System has been designed to incorporate a set of efficient, easy to use tools which will make it possible for scientists to propose observation sequences in a rapid and automated manner. The use of highly automated tools for requesting observations will simplify the long range observatory scheduling process, and the short term scheduling of science observations. Pipeline data processing will be highly automated and data-driven, utilizing a variety of tools developed at JPL, the instrument development teams, and Space Telescope Science Institute to automate processing. An incremental ground data system development approach has been adopted, featuring periodic deliveries that are validated with the flight hardware throughout the various phases of system level development and testing. This approach minimizes development time and decreases operations risk. This paper will describe the top level architecture of the SOS and the basic design concepts. A summary of the incremental development approach will be presented. Examples of the unique science user tools now under final development prior to the first proposal call scheduled for mid-2000 will be shown.

  19. Response Strength in Extreme Multiple Schedules

    ERIC Educational Resources Information Center

    McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…

  20. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  1. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  2. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  3. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  4. 75 FR 29324 - Preferred Supplier Program (PSP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... of the Navy, Acquisition and Logistics Management (DASN (A&LM)), is soliciting comments that the...; in the areas of cost, schedule, performance, quality, and business relations would be granted... exemplary performance, at the corporate level, in the areas of cost, schedule, performance, quality, and...

  5. 75 FR 28788 - Preferred Supplier Program (PSP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ... of the Navy, Acquisition and Logistics Management (DASN (A&LM)), is soliciting comments that the...; in the areas of cost, schedule, performance, quality, and business relations would be granted... demonstrated exemplary performance, at the corporate level, in the areas of cost, schedule, performance...

  6. Surgical demand scheduling: a review.

    PubMed Central

    Magerlein, J M; Martin, J B

    1978-01-01

    This article reviews the literature on scheduling of patient demand for surgery and outlines an approach to improving overall performance of hospital surgical suites. Reported scheduling systems are categorized into those that schedule patients in advance of the surgical date and those that schedule available patients on the day of surgery. Approaches to estimating surgical procedure times are also reviewed, and the article concludes with a discussion of the failure to implement the majority of reported scheduling schemes. PMID:367987

  7. Submarine watch schedules: underway evaluation of rotating (contemporary) and compressed (alternative) schedules.

    PubMed

    Duplessis, C A; Miller, J C; Crepeau, L J; Osborn, C M; Dyche, J

    2007-01-01

    With a desire to increase health, cognitive performance effectiveness, and quality of life for submarine watch-standers underway, we performed an evaluation comparing an alternative, compressed-work (ALT) schedule, designed to enhance circadian rhythm entrainment and sleep hygiene, to the contemporary submarine (SUB) forward rotating schedule, aboard the ballistic-missile submarine, USS Henry M. Jackson (SSBN-730 Gold). We assessed a compressed close-6 watch-schedule ("ALT") relative to the existing backward rotating 6-hr on, 12-hr off 18-hr watch schedule ("SUB") employed underway aboard submarines. We monitored 40 subjects' sleep, and temperature and salivary cortisol from 10 of the 40 for approximately two weeks on each respective schedule underway. The cortisol cosinor mesors (midline estimating statistic of rhythm), and amplitudes did not differ significantly between conditions. The temperature cosinor mesors, and the cosinor amplitude were not significantly different, while the cosine curve fit accounted for significantly more variance in the ALT condition than in the SUB condition. The SUB schedule garnered significantly more sleep (7.1 +/- 0.2 hours) than that of the ALTMID schedule (6.3 +/- 0.3 hours). Surveys revealed that 52% of respondents preferred the SUB schedule, 15% preferred the ALT, and 33% were either indifferent or submitted uninterpretable surveys. The ALT schedule was not superior to the existing SUB schedule by physiological or subjective measures and was incompatible to accommodating operational constraints.

  8. 16 CFR 1406.5 - Performance and technical data to be furnished to the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commission the following performance and technical data related to performance and safety. (a) Written notice... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Performance and technical data to be... TECHNICAL DATA § 1406.5 Performance and technical data to be furnished to the Commission. Manufacturers...

  9. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  10. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  11. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  12. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  13. Middle School A/B Block and Traditional Scheduling: An Analysis of Math and Reading Performance by Race

    ERIC Educational Resources Information Center

    Gill, Willie Wallicia Allen

    2011-01-01

    The purpose of this quantitative study was to examine whether a difference existed in the percentage performance of students earning a pass/advanced score on the Standards of Learning (SOL) Test in math and reading in Virginia's Region IV for schools using an A/B block schedule and those using a traditional schedule. The research also examined if…

  14. CBRAIN: a web-based, distributed computing platform for collaborative neuroimaging research

    PubMed Central

    Sherif, Tarek; Rioux, Pierre; Rousseau, Marc-Etienne; Kassis, Nicolas; Beck, Natacha; Adalat, Reza; Das, Samir; Glatard, Tristan; Evans, Alan C.

    2014-01-01

    The Canadian Brain Imaging Research Platform (CBRAIN) is a web-based collaborative research platform developed in response to the challenges raised by data-heavy, compute-intensive neuroimaging research. CBRAIN offers transparent access to remote data sources, distributed computing sites, and an array of processing and visualization tools within a controlled, secure environment. Its web interface is accessible through any modern browser and uses graphical interface idioms to reduce the technical expertise required to perform large-scale computational analyses. CBRAIN's flexible meta-scheduling has allowed the incorporation of a wide range of heterogeneous computing sites, currently including nine national research High Performance Computing (HPC) centers in Canada, one in Korea, one in Germany, and several local research servers. CBRAIN leverages remote computing cycles and facilitates resource-interoperability in a transparent manner for the end-user. Compared with typical grid solutions available, our architecture was designed to be easily extendable and deployed on existing remote computing sites with no tool modification, administrative intervention, or special software/hardware configuration. As October 2013, CBRAIN serves over 200 users spread across 53 cities in 17 countries. The platform is built as a generic framework that can accept data and analysis tools from any discipline. However, its current focus is primarily on neuroimaging research and studies of neurological diseases such as Autism, Parkinson's and Alzheimer's diseases, Multiple Sclerosis as well as on normal brain structure and development. This technical report presents the CBRAIN Platform, its current deployment and usage and future direction. PMID:24904400

  15. CBRAIN: a web-based, distributed computing platform for collaborative neuroimaging research.

    PubMed

    Sherif, Tarek; Rioux, Pierre; Rousseau, Marc-Etienne; Kassis, Nicolas; Beck, Natacha; Adalat, Reza; Das, Samir; Glatard, Tristan; Evans, Alan C

    2014-01-01

    The Canadian Brain Imaging Research Platform (CBRAIN) is a web-based collaborative research platform developed in response to the challenges raised by data-heavy, compute-intensive neuroimaging research. CBRAIN offers transparent access to remote data sources, distributed computing sites, and an array of processing and visualization tools within a controlled, secure environment. Its web interface is accessible through any modern browser and uses graphical interface idioms to reduce the technical expertise required to perform large-scale computational analyses. CBRAIN's flexible meta-scheduling has allowed the incorporation of a wide range of heterogeneous computing sites, currently including nine national research High Performance Computing (HPC) centers in Canada, one in Korea, one in Germany, and several local research servers. CBRAIN leverages remote computing cycles and facilitates resource-interoperability in a transparent manner for the end-user. Compared with typical grid solutions available, our architecture was designed to be easily extendable and deployed on existing remote computing sites with no tool modification, administrative intervention, or special software/hardware configuration. As October 2013, CBRAIN serves over 200 users spread across 53 cities in 17 countries. The platform is built as a generic framework that can accept data and analysis tools from any discipline. However, its current focus is primarily on neuroimaging research and studies of neurological diseases such as Autism, Parkinson's and Alzheimer's diseases, Multiple Sclerosis as well as on normal brain structure and development. This technical report presents the CBRAIN Platform, its current deployment and usage and future direction.

  16. What 50 Years of Research Tell Us About Pausing Under Ratio Schedules of Reinforcement

    PubMed Central

    Schlinger, Henry D; Derenne, Adam; Baron, Alan

    2008-01-01

    Textbooks in learning and behavior commonly describe performance on fixed-ratio schedules as “break and run,” indicating that after reinforcement subjects typically pause and then respond quickly to the next reinforcement. Performance on variable-ratio schedules, on the other hand, is described as steady and fast, with few long pauses. Beginning with Ferster and Skinner's magnum opus, Schedules of Reinforcement (1957), the literature on pausing under ratio schedules has identified the influences on pausing of numerous important variables, in particular ratio size and reinforcement magnitude. As a result, some previously held assumptions have been called into question. For example, research has shown that the length of the pause is controlled not only by the preceding ratio, as Ferster and Skinner and others had assumed (and as implied by the phrase postreinforcement pause), but by the upcoming ratio as well. Similarly, despite the commonly held belief that ratio pausing is unique to the fixed-ratio schedule, there is evidence that pausing also occurs under variable-ratio schedules. If such widely held beliefs are incorrect, then what about other assumptions? This article selectively examines the literature on pausing under ratio schedules over the past 50 years and concludes that although there may indeed be some common patterns, there are also inconsistencies that await future resolution. Several accounts of pausing under ratio schedules are discussed along with the implications of the literature for human performances, most notably the behaviors termed procrastination. PMID:22478501

  17. EoC Study Update to Examine the Cost, Schedule and Technical Changes to NASA Projects

    NASA Technical Reports Server (NTRS)

    Bitten, Bob; Emmons, Debra; Shinn, Stephen; Scolese, Chris

    2018-01-01

    The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different bins that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one 'magic bullet' consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.

  18. Burbank performs the scheduled extensive cleanup of ventilation systems

    NASA Image and Video Library

    2012-02-22

    ISS030-E-093414 (22 Feb. 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, performs the scheduled extensive cleanup of ventilation systems in the Columbus laboratory of the International Space Station.

  19. Electric/Hybrid Vehicle Simulation

    NASA Technical Reports Server (NTRS)

    Slusser, R. A.; Chapman, C. P.; Brennand, J. P.

    1985-01-01

    ELVEC computer program provides vehicle designer with simulation tool for detailed studies of electric and hybrid vehicle performance and cost. ELVEC simulates performance of user-specified electric or hybrid vehicle under user specified driving schedule profile or operating schedule. ELVEC performs vehicle design and life cycle cost analysis.

  20. Machine Learning Based Online Performance Prediction for Runtime Parallelization and Task Scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, J; Ma, X; Singh, K

    2008-10-09

    With the emerging many-core paradigm, parallel programming must extend beyond its traditional realm of scientific applications. Converting existing sequential applications as well as developing next-generation software requires assistance from hardware, compilers and runtime systems to exploit parallelism transparently within applications. These systems must decompose applications into tasks that can be executed in parallel and then schedule those tasks to minimize load imbalance. However, many systems lack a priori knowledge about the execution time of all tasks to perform effective load balancing with low scheduling overhead. In this paper, we approach this fundamental problem using machine learning techniques first to generatemore » performance models for all tasks and then applying those models to perform automatic performance prediction across program executions. We also extend an existing scheduling algorithm to use generated task cost estimates for online task partitioning and scheduling. We implement the above techniques in the pR framework, which transparently parallelizes scripts in the popular R language, and evaluate their performance and overhead with both a real-world application and a large number of synthetic representative test scripts. Our experimental results show that our proposed approach significantly improves task partitioning and scheduling, with maximum improvements of 21.8%, 40.3% and 22.1% and average improvements of 15.9%, 16.9% and 4.2% for LMM (a real R application) and synthetic test cases with independent and dependent tasks, respectively.« less

  1. Experience in using commercial clouds in CMS

    NASA Astrophysics Data System (ADS)

    Bauerdick, L.; Bockelman, B.; Dykstra, D.; Fuess, S.; Garzoglio, G.; Girone, M.; Gutsche, O.; Holzman, B.; Hufnagel, D.; Kim, H.; Kennedy, R.; Mason, D.; Spentzouris, P.; Timm, S.; Tiradani, A.; Vaandering, E.; CMS Collaboration

    2017-10-01

    Historically high energy physics computing has been performed on large purpose-built computing systems. In the beginning there were single site computing facilities, which evolved into the Worldwide LHC Computing Grid (WLCG) used today. The vast majority of the WLCG resources are used for LHC computing and the resources are scheduled to be continuously used throughout the year. In the last several years there has been an explosion in capacity and capability of commercial and academic computing clouds. Cloud resources are highly virtualized and intended to be able to be flexibly deployed for a variety of computing tasks. There is a growing interest amongst the cloud providers to demonstrate the capability to perform large scale scientific computing. In this presentation we will discuss results from the CMS experiment using the Fermilab HEPCloud Facility, which utilized both local Fermilab resources and Amazon Web Services (AWS). The goal was to work with AWS through a matching grant to demonstrate a sustained scale approximately equal to half of the worldwide processing resources available to CMS. We will discuss the planning and technical challenges involved in organizing the most IO intensive CMS workflows on a large-scale set of virtualized resource provisioned by the Fermilab HEPCloud. We will describe the data handling and data management challenges. Also, we will discuss the economic issues and cost and operational efficiency comparison to our dedicated resources. At the end we will consider the changes in the working model of HEP computing in a domain with the availability of large scale resources scheduled at peak times.

  2. Experience in using commercial clouds in CMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bauerdick, L.; Bockelman, B.; Dykstra, D.

    Historically high energy physics computing has been performed on large purposebuilt computing systems. In the beginning there were single site computing facilities, which evolved into the Worldwide LHC Computing Grid (WLCG) used today. The vast majority of the WLCG resources are used for LHC computing and the resources are scheduled to be continuously used throughout the year. In the last several years there has been an explosion in capacity and capability of commercial and academic computing clouds. Cloud resources are highly virtualized and intended to be able to be flexibly deployed for a variety of computing tasks. There is amore » growing interest amongst the cloud providers to demonstrate the capability to perform large scale scientific computing. In this presentation we will discuss results from the CMS experiment using the Fermilab HEPCloud Facility, which utilized both local Fermilab resources and Amazon Web Services (AWS). The goal was to work with AWS through a matching grant to demonstrate a sustained scale approximately equal to half of the worldwide processing resources available to CMS. We will discuss the planning and technical challenges involved in organizing the most IO intensive CMS workflows on a large-scale set of virtualized resource provisioned by the Fermilab HEPCloud. We will describe the data handling and data management challenges. Also, we will discuss the economic issues and cost and operational efficiency comparison to our dedicated resources. At the end we will consider the changes in the working model of HEP computing in a domain with the availability of large scale resources scheduled at peak times.« less

  3. 16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  4. 7 CFR 98.3 - Analyses performed and locations of laboratories.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the special laboratory analyses rendered by the Science and Technology as a result of an agreement..., Canned) Fat, salt 1 Schedule BJ (Beef with Natural Juices, Canned) Fat 1 Schedule CS (Canned Meatball Stew) Fat 3 Schedule GP (Frozen Ground Pork) Fat 4 Schedule PJ (Pork with Natural Juices, Canned) Fat 1...

  5. 7 CFR 98.3 - Analyses performed and locations of laboratories.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the special laboratory analyses rendered by the Science and Technology as a result of an agreement..., Canned) Fat, salt 1 Schedule BJ (Beef with Natural Juices, Canned) Fat 1 Schedule CS (Canned Meatball Stew) Fat 3 Schedule GP (Frozen Ground Pork) Fat 4 Schedule PJ (Pork with Natural Juices, Canned) Fat 1...

  6. 7 CFR 98.3 - Analyses performed and locations of laboratories.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the special laboratory analyses rendered by the Science and Technology as a result of an agreement..., Canned) Fat, salt 1 Schedule BJ (Beef with Natural Juices, Canned) Fat 1 Schedule CS (Canned Meatball Stew) Fat 3 Schedule GP (Frozen Ground Pork) Fat 4 Schedule PJ (Pork with Natural Juices, Canned) Fat 1...

  7. 7 CFR 98.3 - Analyses performed and locations of laboratories.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the special laboratory analyses rendered by the Science and Technology as a result of an agreement..., Canned) Fat, salt 1 Schedule BJ (Beef with Natural Juices, Canned) Fat 1 Schedule CS (Canned Meatball Stew) Fat 3 Schedule GP (Frozen Ground Pork) Fat 4 Schedule PJ (Pork with Natural Juices, Canned) Fat 1...

  8. 7 CFR 98.3 - Analyses performed and locations of laboratories.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the special laboratory analyses rendered by the Science and Technology as a result of an agreement..., Canned) Fat, salt 1 Schedule BJ (Beef with Natural Juices, Canned) Fat 1 Schedule CS (Canned Meatball Stew) Fat 3 Schedule GP (Frozen Ground Pork) Fat 4 Schedule PJ (Pork with Natural Juices, Canned) Fat 1...

  9. SOSS User Guide

    NASA Technical Reports Server (NTRS)

    Zhu, Zhifan; Gridnev, Sergei; Windhorst, Robert D.

    2015-01-01

    This User Guide describes SOSS (Surface Operations Simulator and Scheduler) software build and graphic user interface. SOSS is a desktop application that simulates airport surface operations in fast time using traffic management algorithms. It moves aircraft on the airport surface based on information provided by scheduling algorithm prototypes, monitors separation violation and scheduling conformance, and produces scheduling algorithm performance data.

  10. 48 CFR 1436.270-2 - Part I-The Schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Construction 1436.270-2 Part I—The Schedule. The CO shall prepare the Schedule as follows: (a) Section A... reliability requirements (See FAR Part 46). (f) Section F, Deliveries or performance. Include Suspension of...

  11. 48 CFR 1436.270-2 - Part I-The Schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Construction 1436.270-2 Part I—The Schedule. The CO shall prepare the Schedule as follows: (a) Section A... reliability requirements (See FAR Part 46). (f) Section F, Deliveries or performance. Include Suspension of...

  12. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activitiesmore » that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)« less

  13. Streamlining Software Aspects of Certification: Technical Team Report on the First Industry Workshop

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J.; Holloway, C. Michael; Knight, John C.; Leveson, Nancy G.; Yang, Jeffrey C.; Dorsey, Cheryl A.; McCormick, G. Frank

    1998-01-01

    To address concerns about time and expense associated with software aspects of certification, the Federal Aviation Administration (FAA) began the Streamlining Software Aspects of Certification (SSAC) program. As part of this program, a Technical Team was established to determine whether the cost and time associated with certifying aircraft can be reduced while maintaining or improving safety, with the intent of impacting the FAA's Flight 2000 program. The Technical Team conducted a workshop to gain a better understanding of the major concerns in industry about software cost and schedule. Over 120 people attended the workshop, including representatives from the FAA,commercial transport and general aviation aircraft manufacturers and suppliers, and procurers and developers of non-airborne systems; and, more than 200 issues about software aspects of certification were recorded. This paper provides an overview of the SSAC program, motivation for the workshop, details of the workshop activities and outcomes, and recommendations for follow-on work.

  14. Scheduled physical activity is associated with better academic performance in Chilean school-age children.

    PubMed

    Burrows, Raquel; Correa-Burrows, Paulina; Orellana, Yasna; Almagiá, Atilio; Lizana, Pablo; Ivanovic, Daniza

    2014-11-01

    This study was carried out to examine the association between systematic physical activity and academic performance in school kids after controlling for potential sociodemographic and educational confounders. In a random sample of 1271 students from urban Santiago, attending 5th and 9th grade, who took the 2009 System for the Assessment of Educational Quality (SIMCE) tests, we measured physical activity habits, anthropometric characteristics, and socioeconomic status. Academic performance was measured by the standardized SIMCE tests. Logistic regressions assessed the relationship between the allocation of time to weekly scheduled exercise, potential confounding factors, and individual academic performance. About 80% of students reported less than 2 hours of weekly scheduled exercise, while 10.6% and 10.2% reported 2 to 4 hours/week and more than 4 hours/week, respectively. Devoting more than 4 hours/week to scheduled exercise significantly increased (P < .01) the odds of having SIMCE composite z-scores ≥ 50th percentile (OR: 2.3, 95% CI: 1.4 to 3.6) and ≥ 75th percentile (OR: 2.1, 95% CI: 1.3-3.3). Better academic performance was associated with a higher allocation of time to scheduled exercise in school-age children.

  15. Genetic algorithm to solve the problems of lectures and practicums scheduling

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  16. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  17. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  18. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  19. 5 CFR 293.404 - Retention schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... RECORDS Employee Performance File System Records § 293.404 Retention schedule. (a)(1) Except as provided... in this system, including transfer with the employee who changes positions, shall be as agencies... performance-related documents five years old or less shall be forwarded in the Employee Performance File along...

  20. Multi-Objective Approach for Energy-Aware Workflow Scheduling in Cloud Computing Environments

    PubMed Central

    Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach. PMID:24319361

  1. Multi-objective approach for energy-aware workflow scheduling in cloud computing environments.

    PubMed

    Yassa, Sonia; Chelouah, Rachid; Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach.

  2. Sleep schedules and school performance in Indigenous Australian children.

    PubMed

    Blunden, Sarah; Magee, Chris; Attard, Kelly; Clarkson, Larissa; Caputi, Peter; Skinner, Timothy

    2018-04-01

    Sleep duration and sleep schedule variability have been related to negative health and well-being outcomes in children, but little is known about Australian Indigenous children. Data for children aged 7-9 years came from the Australian Longitudinal Study of Indigenous Children and the National Assessment Program-Literacy and Numeracy (NAPLAN). Latent class analysis determined sleep classes taking into account sleep duration, bedtimes, waketimes, and variability in bedtimes from weekdays to weekends. Regression models tested whether the sleep classes were cross-sectionally associated with grade 3 NAPLAN scores. Latent change score modeling then examined whether the sleep classes predicted changes in NAPLAN performance from grades 3 to 5. Five sleep schedule classes were identified: normative sleep, early risers, long sleep, variable sleep, and short sleep. Overall, long sleepers performed best, with those with reduced sleep (short sleepers and early risers) performing the worse on grammar, numeracy, and writing performance. Latent change score results also showed that long sleepers performed best in spelling and writing and short sleepers and typical sleepers performed the worst over time. In this sample of Australian Indigenous children, short sleep was associated with poorer school performance compared with long sleep, with this performance worsening over time for some performance indicators. Other sleep schedules (eg, early wake times and variable sleep) also had some relationships with school performance. As sleep scheduling is modifiable, this offers opportunity for improvement in sleep and thus performance outcomes for these and potentially all children. Copyright © 2018 National Sleep Foundation. Published by Elsevier Inc. All rights reserved.

  3. Performance evaluation of different types of particle representation procedures of Particle Swarm Optimization in Job-shop Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Izah Anuar, Nurul; Saptari, Adi

    2016-02-01

    This paper addresses the types of particle representation (encoding) procedures in a population-based stochastic optimization technique in solving scheduling problems known in the job-shop manufacturing environment. It intends to evaluate and compare the performance of different particle representation procedures in Particle Swarm Optimization (PSO) in the case of solving Job-shop Scheduling Problems (JSP). Particle representation procedures refer to the mapping between the particle position in PSO and the scheduling solution in JSP. It is an important step to be carried out so that each particle in PSO can represent a schedule in JSP. Three procedures such as Operation and Particle Position Sequence (OPPS), random keys representation and random-key encoding scheme are used in this study. These procedures have been tested on FT06 and FT10 benchmark problems available in the OR-Library, where the objective function is to minimize the makespan by the use of MATLAB software. Based on the experimental results, it is discovered that OPPS gives the best performance in solving both benchmark problems. The contribution of this paper is the fact that it demonstrates to the practitioners involved in complex scheduling problems that different particle representation procedures can have significant effects on the performance of PSO in solving JSP.

  4. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

  5. Non-Preemptive Time Warp Scheduling Algorithms

    DTIC Science & Technology

    1990-06-01

    conducted in the Applied Technology Program of the Arroyo Center. Questions involving technical issues should be addressed to Dr. ,Jed Marti. Project...emphasizing mid- to long- terin problents. Its research is carried out in five programs : Policy and Strategy Studies: Force Development and Employment...various system parameters to reduce the global program execution time. Because we wanted to scale the system up, we did not allow interprocessor

  6. Space fabrication demonstration system, technical volume

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The automatic beam builder ABB was developed, fabricated, and demonstrated within the established contract cost and schedule constraints. The ABB demonstrated the feasibility of: producing lightweight beams automatically within the required rate of 1 to 5 ft of completed beam per minute and producing structurally sound beams with axial design load of 5538 N based on the Grumman photovoltaic satellite solar power system design reference structure.

  7. Moving Target Information Exploitation Electronic Learning

    DTIC Science & Technology

    2005-10-01

    Traditional - ISR WebTAS – eLearning ................................................................. 6 MTIX e- Learning Technical Requirements...than on a specific schedule, so learners can take the curriculum when needed and at their own pace . E- Learning is a form of instructional authoring...can save training expenses, because it can be used over and over again. E- Learning also allows the user to study at his or her own convenience

  8. One System for Blood Program Information Management

    PubMed Central

    Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.

    1980-01-01

    A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.

  9. Climate Prediction Center - Seasonal Outlook

    Science.gov Websites

    ACCOUNT FOR THE LATEST DYNAMICAL AND STATISTICAL GUIDANCE. LONG TERM TRENDS ACCOUNT FOR THE FAMILIAR U Time. Please consult the schedule of 30 & 90-day outlooks for exact release dates. Text Discussions COLLEGE PARK MD 830 AM EDT THU MAY 17 2018 SUMMARY OF THE OUTLOOK FOR NON-TECHNICAL USERS ENSO NEUTRAL

  10. FX-87 performance measurements: data-flow implementation. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hammel, R.T.; Gifford, D.K.

    1988-11-01

    This report documents a series of experiments performed to explore the thesis that the FX-87 effect system permits a compiler to schedule imperative programs (i.e., programs that may contain side-effects) for execution on a parallel computer. The authors analyze how much the FX-87 static effect system can improve the execution times of five benchmark programs on a parallel graph interpreter. Three of their benchmark programs do not use side-effects (factorial, fibonacci, and polynomial division) and thus did not have any effect-induced constraints. Their FX-87 performance was comparable to their performance in a purely functional language. Two of the benchmark programsmore » use side effects (DNA sequence matching and Scheme interpretation) and the compiler was able to use effect information to reduce their execution times by factors of 1.7 to 5.4 when compared with sequential execution times. These results support the thesis that a static effect system is a powerful tool for compilation to multiprocessor computers. However, the graph interpreter we used was based on unrealistic assumptions, and thus our results may not accurately reflect the performance of a practical FX-87 implementation. The results also suggest that conventional loop analysis would complement the FX-87 effect system« less

  11. A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2003-01-01

    Earth observing satellite (EOS) scheduling is a complex real-world domain representative of a broad class of over-subscription scheduling problems. Over-subscription problems are those where requests for a facility exceed its capacity. These problems arise in a wide variety of NASA and terrestrial domains and are .XI important class of scheduling problems because such facilities often represent large capital investments. We have run experiments comparing multiple variants of the genetic algorithm, hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on two variants of a realistically-sized model of the EOS scheduling problem. These are implemented as permutation-based methods; methods that search in the space of priority orderings of observation requests and evaluate each permutation by using it to drive a greedy scheduler. Simulated annealing performs best and random mutation operators outperform our squeaky (more intelligent) operator. Furthermore, taking smaller steps towards the end of the search improves performance.

  12. A mathematical model for evaluating the impact of vaccination schedules: application to Neisseria meningitidis.

    PubMed

    Tuckwell, H C; Hanslik, T; Valleron, A J; Flahault, A

    2003-06-01

    A mathematical model is described which determines the impact of a schedule of vaccination on the time course of a certain class of diseases. The data are the demographic variables and parameters and age-dependent non-fatal and fatal case rates. Given the age- and time-dependent rates of vaccination including coverage and corresponding efficacies, various schedules may be distinguished by either the absolute numbers of cases and deaths avoided or the numbers of cases and deaths avoided per dose of vaccine. The model was applied to meningo-coccal serogroup C disease in France. The outcomes of six different vaccination schedules were examined. In absolute terms, a schedule in which all individuals aged between 2 and 20 years were vaccinated performed best, but this schedule and that in which only 1-year olds were vaccinated performed equally and best in terms of cases prevented, but not lives saved, per dose.

  13. Traditional/Block Scheduling, Gender, and Test Scores in College Biology Course

    ERIC Educational Resources Information Center

    Huelskamp, Diana

    2014-01-01

    Block scheduling is the reallocation of a school day into longer class sessions to allow for more active teaching strategies and active engagement of students, in the effort to increase student performance. Various types of block scheduling exist. Traditional scheduling is when the school day is divided into six to eight sessions, with each…

  14. Shift work, age, and performance : investigation of the 2-2-1 shift schedule used in air traffic control facilities. I., The sleep/wake cycle.

    DOT National Transportation Integrated Search

    1995-05-01

    Air Traffic Control Specialists (ATCS) work rotating shift schedules for most of their careers. Specifically, many work a counterclockwise rotating shift schedule, called the 2-2-1, or some variation of the schedule. The 2-2-1 involves rotating from ...

  15. The Causal Effect of the School Day Schedule on Adolescents' Academic Achievement

    ERIC Educational Resources Information Center

    Shapiro, Teny M.; Williams, Kevin M.

    2015-01-01

    This study looks at the causal impact of the school day schedule on student achievement. How a student's classes are scheduled throughout the day is often determined by necessity, but can have a meaningful impact on academic performance. Acknowledging students' internal clocks and making small changes to scheduling patters could be a relatively…

  16. Effects of Practice Schedule on Wind Instrument Performance: A Preliminary Application of a Motor Learning Principle

    ERIC Educational Resources Information Center

    Stambaugh, Laura A.; Demorest, Steven M.

    2010-01-01

    The effects of three practice schedules on beginning instrumental achievement were explored. A total of 19 seventh-grade clarinet and saxophone students completed one 18-minute practice session using either a blocked schedule causing a low level of cognitive (contextual) interference, a hybrid schedule causing a moderate level of interference, or…

  17. Long range science scheduling for the Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Johnston, Mark

    1991-01-01

    Observations with NASA's Hubble Space Telescope (HST) are scheduled with the assistance of a long-range scheduling system (SPIKE) that was developed using artificial intelligence techniques. In earlier papers, the system architecture and the constraint representation and propagation mechanisms were described. The development of high-level automated scheduling tools, including tools based on constraint satisfaction techniques and neural networks is described. The performance of these tools in scheduling HST observations is discussed.

  18. The Undergraduate Student Instrument Project (USIP) - building the STEM workforce by providing exciting, multi-disciplinary, student-led suborbital flight projects.

    NASA Astrophysics Data System (ADS)

    Dingwall, B. J.

    2015-12-01

    NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that were necessary for success. A student survey was conducted to assess the impact of USIP. Over 90% of students reported a significant improvement in their technical and project management skills. Perhaps more importantly, 88% of students reported that they have a far better appreciation for the value of multi-disciplinary teams.

  19. Effects of reinforcer magnitude on responding under differential-reinforcement-of-low-rate schedules of rats and pigeons.

    PubMed

    Doughty, Adam H; Richards, Jerry B

    2002-07-01

    Experiment I investigated the effects of reinforcer magnitude on differential-reinforcement-of-low-rate (DRL) schedule performance in three phases. In Phase 1, two groups of rats (n = 6 and 5) responded under a DRI. 72-s schedule with reinforcer magnitudes of either 30 or 300 microl of water. After acquisition, the water amounts were reversed for each rat. In Phase 2, the effects of the same reinforcer magnitudes on DRL 18-s schedule performance were examined across conditions. In Phase 3, each rat responded unider a DR1. 18-s schedule in which the water amotnts alternated between 30 and 300 microl daily. Throughout each phase of Experiment 1, the larger reinforcer magnitude resulted in higher response rates and lower reinforcement rates. The peak of the interresponse-time distributions was at a lower value tinder the larger reinforcer magnitude. In Experiment 2, 3 pigeons responded under a DRL 20-s schedule in which reinforcer magnitude (1-s or 6-s access to grain) varied iron session to session. Higher response rates and lower reinforcement rates occurred tinder the longer hopper duration. These results demonstrate that larger reinforcer magnitudes engender less efficient DRL schedule performance in both rats and pigeons, and when reinforcer magnitude was held constant between sessions or was varied daily. The present results are consistent with previous research demonstrating a decrease in efficiency as a function of increased reinforcer magnituide tinder procedures that require a period of time without a specified response. These findings also support the claim that DRI. schedule performance is not governed solely by a timing process.

  20. Effects of reinforcer magnitude on responding under differential-reinforcement-of-low-rate schedules of rats and pigeons.

    PubMed Central

    Doughty, Adam H; Richards, Jerry B

    2002-01-01

    Experiment I investigated the effects of reinforcer magnitude on differential-reinforcement-of-low-rate (DRL) schedule performance in three phases. In Phase 1, two groups of rats (n = 6 and 5) responded under a DRI. 72-s schedule with reinforcer magnitudes of either 30 or 300 microl of water. After acquisition, the water amounts were reversed for each rat. In Phase 2, the effects of the same reinforcer magnitudes on DRL 18-s schedule performance were examined across conditions. In Phase 3, each rat responded unider a DR1. 18-s schedule in which the water amotnts alternated between 30 and 300 microl daily. Throughout each phase of Experiment 1, the larger reinforcer magnitude resulted in higher response rates and lower reinforcement rates. The peak of the interresponse-time distributions was at a lower value tinder the larger reinforcer magnitude. In Experiment 2, 3 pigeons responded under a DRL 20-s schedule in which reinforcer magnitude (1-s or 6-s access to grain) varied iron session to session. Higher response rates and lower reinforcement rates occurred tinder the longer hopper duration. These results demonstrate that larger reinforcer magnitudes engender less efficient DRL schedule performance in both rats and pigeons, and when reinforcer magnitude was held constant between sessions or was varied daily. The present results are consistent with previous research demonstrating a decrease in efficiency as a function of increased reinforcer magnituide tinder procedures that require a period of time without a specified response. These findings also support the claim that DRI. schedule performance is not governed solely by a timing process. PMID:12144310

  1. Allied restorative functions training in Minnesota: a case study.

    PubMed

    Cooper, Brigette R; Monson, Angela L

    2007-03-01

    In 2003, the Minnesota Dental Practice Act was modified to allow dental hygienists and assistants to place amalgam, composite, glass ionomer, and stainless steel crowns. The concept of utilizing allied professionals to perform expanded functions has been suggested as a way to increase access to care and productivity. A continuing education course was offered to provide required certification for interested dental practitioners (N=12). The objectives of this study were to examine confidence levels and effectiveness of the continuing education program. Pre- and post-course restorative content knowledge, along with confidence levels in knowledge, technical skills, and the ability to implement skills were measured. A matched pairs t-test found a significant increase in participants' restorative content knowledge (p<.001). Wilcoxen signed rank tests revealed an increase in confidence in all content knowledge (p<.01) and technical skill (p<.05) categories. Participants did not significantly increase in confidence to implement restorative functions skills into practice (p<.7). Interview data revealed that participants remain unclear about ways to incorporate restorative functions into the schedule. Findings in this case study suggest that content knowledge and confidence levels increase following completion of a restorative functions course. To improve education and training, research is needed to identify why participants' confidence in implementation did not increase.

  2. Simulation and training in Urology - in collaboration with ESU/ESUT.

    PubMed

    Veneziano, Domenico; Cacciamani, Giovanni; Shekhar Biyani, Chandra

    2018-01-01

    Being a Surgeon today means taking on your shoulders countless responsibilities. It is definitely a high-stakes job but, even though the professionals do not go through the intense, focused and demanding training schedule as followed by the other equally risky fields, it doesn't yet require any practical training certification. Simulation was introduced in the aviation field in the early '30s with the "Link Trainer", designed to reproduce the most difficult flying case scenario: landing on an air-carrier. After almost a century, flight simulation is still becoming more sophisticated, while surgical training is slowly starting to fill the gap. The aim of a simulator is to produce an "imitation of the operation of a real-world process or system over time". This short but effective definition explains why simulators are utilised across different fields. There is no doubt that surgeons are continuously undergoing a condition of stress, even in nonthreatening situations, while performing a procedure. This condition adds a relevant variable to surgery, meaning that mastering technical skills is not always equal to "safe surgery". This is why "non-technical skills" (NTS) training should be a part of any simulation based training opportunity and will probably start to be always more part of the Handson Training programs.

  3. Social energy: mining energy from the society

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Jun Jason; Gao, David Wenzhong; Zhang, Yingchen

    The inherent nature of energy, i.e., physicality, sociality and informatization, implies the inevitable and intensive interaction between energy systems and social systems. From this perspective, we define 'social energy' as a complex sociotechnical system of energy systems, social systems and the derived artificial virtual systems which characterize the intense intersystem and intra-system interactions. The recent advancement in intelligent technology, including artificial intelligence and machine learning technologies, sensing and communication in Internet of Things technologies, and massive high performance computing and extreme-scale data analytics technologies, enables the possibility of substantial advancement in socio-technical system optimization, scheduling, control and management. In thismore » paper, we provide a discussion on the nature of energy, and then propose the concept and intention of social energy systems for electrical power. A general methodology of establishing and investigating social energy is proposed, which is based on the ACP approach, i.e., 'artificial systems' (A), 'computational experiments' (C) and 'parallel execution' (P), and parallel system methodology. A case study on the University of Denver (DU) campus grid is provided and studied to demonstrate the social energy concept. In the concluding remarks, we discuss the technical pathway, in both social and nature sciences, to social energy, and our vision on its future.« less

  4. Comparison of modal test results - Multipoint sine versus single-point random. [for Mariner Jupiter/Saturn spacecraft

    NASA Technical Reports Server (NTRS)

    Leppert, E. L.; Lee, S. H.; Day, F. D.; Chapman, P. C.; Wada, B. K.

    1976-01-01

    The Mariner Jupiter/Saturn (MJS) spacecraft was subjected to the traditional multipoint sine dwell (MPSD) modal test using 111 accelerometer channels, and also to single-point random (SPR) testing using 26 accelerometer channels, and the two methods are compared according to cost, schedule, and technical criteria. A measure of comparison between the systems was devised in terms of the cumulative difference in the kinetic energy distribution of the common accelerometers. The SPR and MPSD method show acceptable agreement with respect to frequencies and mode damping. The merit of the SPR method is that the excitation points are minimized and the test article can be committed to other uses while data analysis is performed. The MPSD approach allows validity of the data to be determined as the test progresses. Costs are about the same for the two methods.

  5. Comprehensive Design Reliability Activities for Aerospace Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Christenson, R. L.; Whitley, M. R.; Knight, K. C.

    2000-01-01

    This technical publication describes the methodology, model, software tool, input data, and analysis result that support aerospace design reliability studies. The focus of these activities is on propulsion systems mechanical design reliability. The goal of these activities is to support design from a reliability perspective. Paralleling performance analyses in schedule and method, this requires the proper use of metrics in a validated reliability model useful for design, sensitivity, and trade studies. Design reliability analysis in this view is one of several critical design functions. A design reliability method is detailed and two example analyses are provided-one qualitative and the other quantitative. The use of aerospace and commercial data sources for quantification is discussed and sources listed. A tool that was developed to support both types of analyses is presented. Finally, special topics discussed include the development of design criteria, issues of reliability quantification, quality control, and reliability verification.

  6. Telescope Array Low energy Extension: TALE

    NASA Astrophysics Data System (ADS)

    Ogio, Shoichi

    TALE, the Telescope Array Low Energy extension was designed to lower the energy threshold to about 1016.5 eV. TALE has a surface detector (SD) array made up of 103 scintillation counters (40 with 400 m spacing, 36 with 600 m spacing and 27 with 1.2 km spacing) and a Fluorescence Detector (FD) station consisting of ten FD telescopes working with the Telescope Array Middle Drum FD station, which is made up of 14 telescopes. TALE-FD full operation started in 2013 and the SD array was partially-completed with 16 SDs and continues the operation from 2014. We will describe the history and the current status of the detectors and will make a brief report about the FD and the hybrid analysis results. TALE detector will be completed as a hybrid air shower detector in 2018. We will report the technical details of the detectors, the schedule and the expected performances.

  7. NASA Engineering and Technology Advancement Office: A proposal to the administrator

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1993-01-01

    NASA has continually had problems with cost, schedule, performance, reliability, quality, and safety aspects in programs. Past solutions have not provided the answers needed, and a major change is needed in the way of doing business. A new approach is presented for consideration. These problems are all engineering matters, and therefore, require engineering solutions. Proper engineering tools are needed to fix engineering problems. Headquarters is responsible for providing the management structure to support programs with appropriate engineering tools. A guide to define those tools and an approach for putting them into place is provided. Recommendations include establishing a new Engineering and Technology Advancement Office, requesting a review of this proposal by the Administrator since this subject requires a top level decision. There has been a wide peer review conducted by technical staff at Headquarters, the Field Installations, and others in industry as discussed.

  8. Efficient relaxed-Jacobi smoothers for multigrid on parallel computers

    NASA Astrophysics Data System (ADS)

    Yang, Xiang; Mittal, Rajat

    2017-03-01

    In this Technical Note, we present a family of Jacobi-based multigrid smoothers suitable for the solution of discretized elliptic equations. These smoothers are based on the idea of scheduled-relaxation Jacobi proposed recently by Yang & Mittal (2014) [18] and employ two or three successive relaxed Jacobi iterations with relaxation factors derived so as to maximize the smoothing property of these iterations. The performance of these new smoothers measured in terms of convergence acceleration and computational workload, is assessed for multi-domain implementations typical of parallelized solvers, and compared to the lexicographic point Gauss-Seidel smoother. The tests include the geometric multigrid method on structured grids as well as the algebraic grid method on unstructured grids. The tests demonstrate that unlike Gauss-Seidel, the convergence of these Jacobi-based smoothers is unaffected by domain decomposition, and furthermore, they outperform the lexicographic Gauss-Seidel by factors that increase with domain partition count.

  9. Decentralized Control of Scheduling in Distributed Systems.

    DTIC Science & Technology

    1983-12-15

    does not perform quite as well as the 10 state system, but is less sensitive to changes in scheduling period. It performs best when scheduling is...intra-process concerns. We extend theLr concept of a process to inolude Inter -ress comunication. That is. various form of send and receive primitives...Current busyness of each site based on some responses to requests for bids. A received bid is utilization factor. adjusted by incrementing it by a

  10. Friction Stir Process Mapping Methodology

    NASA Technical Reports Server (NTRS)

    Bjorkman, Gerry; Kooney, Alex; Russell, Carolyn

    2003-01-01

    The weld process performance for a given weld joint configuration and tool setup is summarized on a 2-D plot of RPM vs. IPM. A process envelope is drawn within the map to identify the range of acceptable welds. The sweet spot is selected as the nominal weld schedule The nominal weld schedule is characterized in the expected manufacturing environment. The nominal weld schedule in conjunction with process control ensures a consistent and predictable weld performance.

  11. A Quantitative Causal-Comparative Study Examining the Effect of Block and Traditional Bell Schedules on Cognitive Load and Mathematics Academic Performance in High School Freshmen of the Southwestern USA

    ERIC Educational Resources Information Center

    Nogler, Tracey A.

    2017-01-01

    The purpose of this quantitative causal-comparative research was to examine if and to what extent there were differences in students' cognitive load and the subsequent academic performance based on block bell schedule and traditional bell schedule for freshmen in Algebra 1 in the Southwestern United States. This study included students from two…

  12. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  13. 16 CFR § 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  14. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  15. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  16. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  17. 16 CFR 1407.3 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to... TECHNICAL DATA BY LABELING § 1407.3 Providing performance and technical data to purchasers by labeling. (a... technical data related to performance and safety to prospective purchasers of such products at the time of...

  18. Remediation management of complex sites using an adaptive site management approach.

    PubMed

    Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula

    2017-12-15

    Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Quantifying Scheduling Challenges for Exascale System Software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mondragon, Oscar; Bridges, Patrick G.; Jones, Terry R

    2015-01-01

    The move towards high-performance computing (HPC) ap- plications comprised of coupled codes and the need to dra- matically reduce data movement is leading to a reexami- nation of time-sharing vs. space-sharing in HPC systems. In this paper, we discuss and begin to quantify the perfor- mance impact of a move away from strict space-sharing of nodes for HPC applications. Specifically, we examine the po- tential performance cost of time-sharing nodes between ap- plication components, we determine whether a simple coor- dinated scheduling mechanism can address these problems, and we research how suitable simple constraint-based opti- mization techniques are for solvingmore » scheduling challenges in this regime. Our results demonstrate that current general- purpose HPC system software scheduling and resource al- location systems are subject to significant performance de- ciencies which we quantify for six representative applica- tions. Based on these results, we discuss areas in which ad- ditional research is needed to meet the scheduling challenges of next-generation HPC systems.« less

  20. Operational assessment of the 5-h on/10-h off watchstanding schedule on a US Navy ship: sleep patterns, mood and psychomotor vigilance performance of crewmembers in the nuclear reactor department.

    PubMed

    Shattuck, Nita Lewis; Matsangas, Panagiotis

    2016-05-01

    We assessed sleep patterns, psychomotor vigilance performance, work demands and mood of 77 crewmembers of USS NIMITZ (CVN-68) on the rotating 5-h on/10-h off (5/10) watchstanding schedule. Within the 3-day cycle of the 5/10, sleep occurred at distinctly different times each day. On two of these days, sailors typically received only brief, 4-h sleep episodes followed by periods of sustained wakefulness (approximately 22 and 20 h). Crewmembers received approximately seven hours of sleep daily, but reported excessive fatigue and dissatisfaction with their schedule. Crewmembers' mood worsened significantly over the course of the underway phase. Psychomotor vigilance performance (reaction times, lapses) was significantly degraded compared to performance when working circadian-aligned schedules. Overall, standing watch on the 5/10 schedule, combined with other work duties, resulted in poor sleep hygiene. Crewmembers on the 5/10 experienced periodic bouts of sustained wakefulness and accrued a significant sleep debt due to extended workdays and circadian-misaligned sleep. Practitioner summary: We assessed crewmembers' sleep patterns, psychomotor vigilance performance and work demands when working a rotating 5-h on/10-h off (5/10) watchstanding schedule. The 5/10, combined with other work duties, resulted in poor sleep hygiene. Crewmembers experienced periodic bouts of sustained wakefulness and accrued a significant sleep debt due to extended workdays and circadian-misaligned sleep.

Top