Sample records for technical planning activity

  1. Integrating Science with Technical and Vocational Areas.

    ERIC Educational Resources Information Center

    Snyder, Larry; Shreckengast, Craig

    This guide presents learning activities and lesson plans that integrate science with technical and vocational areas. Activities and plans are organized under broad headings such as Environmental Science and Acid Rain Research; Criminal Justice, Chemistry, and Narcotics; Children's Education and Services; Cosmetology; and Health Professions.…

  2. Geotechnical support and topical studies for nuclear waste geologic repositories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less

  4. A Guide to Systematic Planning for Vocational and Technical Schools. Research 22.

    ERIC Educational Resources Information Center

    Meckley, Richard F.; And Others

    A school planning scheme involving 46 principle activities which occur over a 38-month period is presented. This scheme was developed for individuals responsible for the planning of vocational and technical schools, i.e., supervisors, state staff, university school plant planners, architects, and local school administrators. The activities…

  5. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical....205-76 Trade, business, technical, and professional activity costs. (a) FEHBP participating plans, carriers, and underwriters shall seek the advance written approval of the contracting officer for...

  6. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  7. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  8. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  9. Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CAMPBELL, L.R.

    1999-09-29

    This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.

  10. Planning as an Iterative Process

    NASA Technical Reports Server (NTRS)

    Smith, David E.

    2012-01-01

    Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.

  11. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  12. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  13. 7 CFR 652.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE General Provisions § 652.2 Definitions... public agencies certified by NRCS to provide technical services to a participant. Certification means the... technical service for conservation planning or a specific conservation practice or system; or (2) An entity...

  14. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  15. A Navy Shore Activity Manpower Planning System for Civilians. Technical Report No. 24.

    ERIC Educational Resources Information Center

    Niehaus, R. J.; Sholtz, D.

    This report describes the U.S. Navy Shore Activity Manpower Planning System (SAMPS) advanced development research project. This effort is aimed at large-scale feasibility tests of manpower models for large Naval installations. These local planning systems are integrated with Navy-wide information systems on a data-communications network accessible…

  16. Planning and Development of Lab Training Activities for Powerline Communications

    ERIC Educational Resources Information Center

    Drosopoulos, A.; Hatziprokopiou, M.

    2010-01-01

    This paper discusses the planning and development of student training and activities for the Powerline Communications Laboratory at the Technical Education Institute (TEI), Patras, Greece. Powerline communications is currently an active area of research and development that combines three separate specializations from the standard training of…

  17. Goddard Geophysical and Astronomical Observatory

    NASA Technical Reports Server (NTRS)

    Covey, Rawland; Kodak, Charles

    1999-01-01

    This report summarizes the technical parameters and the technical staff of the VLBI system at GGAO. It also gives an overview of VLBI activities during the previous year. The outlook lists the tasks planned for 1999.

  18. UK technical activities associated with the return to Earth of the MIR space station

    NASA Astrophysics Data System (ADS)

    Crowther, Richard; Tremayne-Smith, Richard

    2002-11-01

    The British National Space Centre (BNSC) acts as the focus in the United Kingdom (UK) for space-related activities. With the anticipated return to Earth of the MIR space station, BNSC established a group of technical experts to consider the associated implications for the UK, and to address both national and international activities relating to the planned de-orbit. In particular, the risk to the UK of an uncontrolled re-entry was considered in contingency planning and the means for the provision of accurate information to the public and media were established to ensure balanced view of the potential hazards that MIR posed to persons and property on the ground. The MIR de-orbit was exemplary, both in terms of the technical activities of the Rosaviakosmos and the safe disposal of MIR in the Pacific, and in relation to the open and effective communication between agencies and the positive reporting by the media.

  19. Formative evaluation of AARP's Active for Life campaign to improve walking and bicycling environments in two cities.

    PubMed

    Emery, James; Crump, Carolyn; Hawkins, Margaret

    2007-10-01

    AARP conducted a 2.5-year social-marketing campaign to improve physical activity levels among older adults in Richmond, Virginia and Madison, Wisconsin. This article presents formative evaluation findings from the campaign's policy/environmental change component. Evaluation data were abstracted from technical-assistance documentation and telephone interviews. Results include 11 policy and 14 environmental changes attained or in-process by campaign closure. Differences between the cities' results are explained through differences in program implementation (e.g., types of changes planned, formalization of partnerships). Project teams took less time deciding to pursue policy change than environmental change; however, planning the policy activities took longer than planning environmental-change activities. Recommendations for future policy/environmental change interventions focus on the selection of strategies; planning for administrative resources; formalizing partnerships to ensure sustainability of impact; ensuring training and technical assistance; and documenting progress. Similar intervention results may be attainable with a multi-year timeframe, adequate part-time coordination, and committed volunteers.

  20. Site characterization progress report: Yucca Mountain, Nevada, October 1, 1994--March 31, 1995, Number 12. Nuclear Waste Policy Act (Section 113)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less

  1. Administrative Information Systems Plan for FY89

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-11-01

    The Administrative Information Systems (AIS) Plan was developed to prioritize, track, and control the cost of AIS activities. This annually published plan, in conjunction with quarterly status reports, measures projected AIS activities and progress. The AIS Plan and quarterly reporting are administered jointly by the Director of Computing and an Organization 30 director. Priority development projects are clearly defined and closely managed efforts that consume significant resources. Directorate supplementals describe other AIS activity within each directorate, which may include: production support; technical support; development activity; and other AIS effort.

  2. DoDEA Seniors' Postsecondary Plans and Scholarships, 2010

    ERIC Educational Resources Information Center

    Embler, Sandra

    2010-01-01

    During their senior year students in the Department of Defense Education Activity (DoDEA) schools develop a postsecondary plan. This plan outlines what students intend to do after graduating from high school; whether they are planning to attend a 4-year college/university, junior/community college, or vocational/technical school; seek employment…

  3. [Personal Futures Planning: Building a Foundation for Individualized Transition Services.

    ERIC Educational Resources Information Center

    Carr, Theresa, Ed.

    1993-01-01

    These two newsletter special issues focus on personal futures planning (PFP) for people with deaf blindness, with emphasis on technical assistance activities involved in implementing a PFP program. PFP guides a team through three phases of activities: (1) developing a "circle of support" for an individual with deaf blindness; (2)…

  4. Analysis and Prospects of European Co-Operation in the Field of Regional Planning. Activity Report of the Committee of Senior Officials 1976-1978.

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    To guide future work, to provide an overall view of the program of technical cooperation in regional planning, and to form a basis for a Conference Ministerial Resolution, the report outlines the activities of the Committee of Senior Officials (CSO) of the Council of Europe's Conference of Ministers Responsible for Regional Planning during…

  5. M-X Environmental Technical Report. Alternative Potential Operating Base Locations Dalhart.

    DTIC Science & Technology

    1980-12-22

    CONTENTS PAGE 1.0 Dalhart and Vicinity Community Environment I 1.1 Human Environment I 1.1.1 Economic Activity 1 1.1.2 Public Finance 9 1.1.3 Population 9...county area. 1.1 HUMAN ENVIRONMENT ECONOMIC ACTIVITY (1.1.1) Employment Tables 1.1.1-1 and 1.1.1-2 highlight detailed employment characteristics of Dallam...clearinghouse responsible for planning in the subject region. The local planning activities are implemented under the authority of "Regional Planning Commissions

  6. EOS Laser Atmosphere Wind Sounder (LAWS) investigation

    NASA Technical Reports Server (NTRS)

    Emmitt, George D.

    1991-01-01

    The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'

  7. Underground Test Area Activity Preemptive Review Guidance Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene; Rehfeldt, Kenneth

    Preemptive reviews (PERs) of Underground Test Area (UGTA) Activity corrective action unit (CAU) studies are an important and long-maintained quality improvement process. The CAU-specific PER committees provide internal technical review of ongoing work throughout the CAU lifecycle. The reviews, identified in the UGTA Quality Assurance Plan (QAP) (Sections 1.3.5.1 and 3.2), assure work is comprehensive, accurate, in keeping with the state of the art, and consistent with CAU goals. PER committees review various products, including data, documents, software/codes, analyses, and models. PER committees may also review technical briefings including Federal Facility Agreement and Consent Order (FFACO)-required presentations to the Nevadamore » Division of Environmental Protection (NDEP) and presentations supporting key technical decisions (e.g., investigation plans and approaches). PER committees provide technical recommendations to support regulatory decisions that are the responsibility of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and NDEP.« less

  8. Cape Blanco Wind Farm Feasibility Study : Technical Report, No. 2, Civil Engineering.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1986-09-01

    An investigation of the feasibility of developing a wind farm near Cape Blanco, Oregon, requires a plan for civil engineering and preliminary site construction activities. In this report, plans for such activities and related cost estimates are presented for a wind farm using either a Boeing MOD-2 or FloWind 170 wind turbine generator.

  9. Homeroom Activities in a College of Technology Based on the Master Plan

    NASA Astrophysics Data System (ADS)

    Fuchida, Kunihiiko; Murata, Hideaki; Yuji, Junichiro

    Homeroom (HR) activities have an important role in engineering education at technical colleges. Yatsushiro National College of Technology has made a master plan for them and has been putting the plan into practical use since 2002. This plan is comprehensive and has two main categories, social education and career guidance, both being composed of three sub-categories (e.g., self-understanding and making future plans) . Based on the master plan, each HR teacher makes his own plan for HR activities for his classroom at the beginning of the academic year. We have reached a consensus to share our practice and to improve HR activities for years to come. We also recognize that to carry out HR activities based on a master plan that reflects the school's educational goals is essential in order to train students who are well-prepared, both as engineers and as humans.

  10. Structuring of manual of orientations and technical information for laundries of industries of animal products origin.

    PubMed

    da Silva, Vania Eugênia; Mafra, Simone Caldas Tavares; Mafra, Cláudio Lísias; de Souza, Amaury Paulo

    2012-01-01

    This study looked for to lift information regarding laundries inserted in industries of animal products origin, to understand the activities developed in the section and to structure a Manual of Planning and Technical Information for laundries to industries of animal products origin, with the intention of subsidizing the planning, structuring and control of this work place, because norms or regulations that supervise don't exist or aid their managers and workers as for the operation of this work place.

  11. Systematic Exploitation of Marginal Flexibility in Staff Planning.

    ERIC Educational Resources Information Center

    Lawaetz, Peter

    1984-01-01

    The Technical University of Denmark has tried to free resources in a stagnant or declining budget for development of new subject areas by planned contraction of ordinary activities, with only moderate success due to low mobility and strong specialization of the scientific staff. A more realistic planning system has been introduced, using…

  12. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  13. 14 CFR 1216.304 - Major decision points.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical, economic, and other factors, in the earliest planning. At that stage, the responsible... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have...

  14. 7 CFR 1948.57 - Eligible activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Education plans; and (vi) Subdivision plans. (3) Payment of salaries of professional, technical, and... to undertake tests, make appraisals, and arrange for engineering/architectural services necessary for...) Necessary engineering reports in connection with site development; (7) Payment of costs to undertake tests...

  15. SERC 2014 2018 Technical Plan: 2016 Update

    DTIC Science & Technology

    2016-02-18

    Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents

  16. 77 FR 55216 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ..., due to technical difficulties, the documents associated with the information collection request were not made available to the public until August 14, 2012. Because of the technical difficulties, CMS is... Social Security Act (SSA) requires Medicare health plans to provide enrollees with a written notice in...

  17. 77 FR 40634 - Solicitation for a Cooperative Agreement: Pretrial Technical Assistance for Evidence-Based...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ...: Pretrial Technical Assistance for Evidence-Based Decision Making in Local Criminal Justice Systems AGENCY... NIC initiative, Evidence-Based Decision Making (EBDM) in Local Criminal Justice Systems. Work under... individual system planning activities. These change strategies are critical to meeting their system's harm...

  18. Flat-plate solar array project. Volume 8: Project analysis and integration

    NASA Technical Reports Server (NTRS)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  19. Connected commercial vehicles-integrated truck project : vehicle build and build test plan, final technical report.

    DOT National Transportation Integrated Search

    2000-12-01

    This paper brings together the findings of activities that addressed the impacts of nontechnical barriers and constraints that might impede the progress of Intelligent Transportation Systems (ITS) programs. It discusses how the planning and deploymen...

  20. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personnel, evaluated work plans, determined critical issues and uncertainties, and recommended alternatives. This report documents the findings and recommendations of the independent technical review team.« less

  1. International Space Station (ISS) Expedite the Process of Experiments to Space Station (EXPRESS) Racks Software Support

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED 14), the MSFC EXPRESS Project Office (FD3 l), and the Huntsville Boeing Company. Work accomplishments included the support of SRB activities, ATB activities, ESCP activities, participating in technical meetings, coordinating issues between the Boeing Company and the MSFC Project Office, and performing special tasks as requested.

  2. Social and economic profile technical guide

    Treesearch

    David Seesholtz; Denise Wickwar; John C. Russell

    2006-01-01

    A social and economic profile is a key element of a social assessment. A social and economic assessment or profile is used by line officers, planning staff social scientists, and others to inform both forest planning activities and project-level work. It is important to discover how planning and management decisions made by National Forest System staff will affect...

  3. 44 CFR 352.23 - Functions of a Regional Assistance Committee (RAC).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Under 44 CFR part 351, the role of a RAC is to assist State and local government officials to develop their radiological emergency plans, to review the plans, and to observe exercises to evaluate the plans. Under subparts A and B of this part, these technical assistance activities are extended to the licensee...

  4. 44 CFR 352.23 - Functions of a Regional Assistance Committee (RAC).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Under 44 CFR part 351, the role of a RAC is to assist State and local government officials to develop their radiological emergency plans, to review the plans, and to observe exercises to evaluate the plans. Under subparts A and B of this part, these technical assistance activities are extended to the licensee...

  5. Activity Planning for the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Jonsson, Ari K.; Morris, Paul H.; Rajan, Kanna

    2004-01-01

    Operating the Mars Exploration Rovers is a challenging, time-pressured task. Each day, the operations team must generate a new plan describing the rover activities for the next day. These plans must abide by resource limitations, safety rules, and temporal constraints. The objective is to achieve as much science as possible, choosing from a set of observation requests that oversubscribe rover resources. In order to accomplish this objective, given the short amount of planning time available, the MAPGEN (Mixed-initiative Activity Plan GENerator) system was made a mission-critical part of the ground operations system. MAPGEN is a mixed-initiative system that employs automated constraint-based planning, scheduling, and temporal reasoning to assist operations staff in generating the daily activity plans. This paper describes the adaptation of constraint-based planning and temporal reasoning to a mixed-initiative setting and the key technical solutions developed for the mission deployment of MAPGEN.

  6. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  7. 7 CFR 3800.3 - Functions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., climate, and related crop monitoring activities. (d) Remote sensing. (1) Provide technical assistance, coordination, and guidance to Department agencies in planning, developing, and carrying out satellite remote... administrative, management, and budget information relating to Department's remote sensing activities. ...

  8. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  9. Pretest Predictions for Phase II Ventilation Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yiming Sun

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less

  10. Integrated Application of Active Controls (IAAC) Technology to an Advanced Subsonic Transport: Project Plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The state of the art of active controls technology (ACT) and a recommended ACT development program plan are reviewed. The performance benefits and cost of ownership of an integrated application of ACT to civil transport aircraft is to be assessed along with the risk and laboratory and/or flight experiments designed to reduce the technical risks to a commercially acceptable level.

  11. Quality Assurance Project Plan - Modeling the Impact of Hydraulic Fracturing on Water Resources Based on Water Acquisition Scenarios

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study. The goal of this project is to evaluate the potential impacts of large volume water withdrawals.

  12. 40 CFR 93.153 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operation to activities currently being conducted. (xii) Planning, studies, and provision of technical... control activities and adopting approach, departure, and enroute procedures for aircraft operations above... (e) of this section. (3) Research, investigations, studies, demonstrations, or training (other than...

  13. 40 CFR 93.153 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operation to activities currently being conducted. (xii) Planning, studies, and provision of technical... control activities and adopting approach, departure, and enroute procedures for aircraft operations above... (e) of this section. (3) Research, investigations, studies, demonstrations, or training (other than...

  14. 40 CFR 93.153 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operation to activities currently being conducted. (xii) Planning, studies, and provision of technical... control activities and adopting approach, departure, and enroute procedures for aircraft operations above... (e) of this section. (3) Research, investigations, studies, demonstrations, or training (other than...

  15. Conservation planning and accomplishments for protection of Cerulean Warbler (Setophaga cerulea) nonbreeding habitat

    Treesearch

    Benjamin Skolnik; David Wiedenfeld; Randy Dettmers; Constantino Aucca; Lina Daza; Heidy Valle; Francisco Sornoza; Javier Robayo; David Diaz; Jane Fitzgerald; Daniel Lebbin; Paul B. Hamel

    2012-01-01

    Vital to the work of the Cerulean Warbler Technical Group has been the collaboration among members to evaluate population status and coordinate planning for future activities, principally in conservation implementation. Two plans have been produced, one a general strategy for the conservation and management of the species over its entire range, and a more restricted...

  16. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less

  17. Software Engineering Improvement Activities/Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  18. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  19. EPA Technical Support Centers (TSC): FY14 Lessons ...

    EPA Pesticide Factsheets

    EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this information to users in both direct applications (i.e., site-specific technical support) and general applications (i.e., technical transfer activities such as technical guidance documents, conferences, or workshops) . The TSCs are charged with providing solutions by: 1) linking EPA research to Agency decision-makers; 2) applying best practices to real world field applications; and 3) channeling feedback from field application to research communities. The TSP goal is to provide Regional Remedial Project Managers (RPMs), Corrective Action Staff, and On-Scene Coordinators (OSCs) with a diverse set of readily-accessible resources for technical assistance. This research summary provides six case studies – two from each of the three TSCs (Ground Water Technical Support Center, Engineering Technical Support Center, and Site Characterization Technical Support Center) – to exemplify and summarize the variety of TSC approaches that contribute to fulfilling the TSP mission. EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this informati

  20. Specification of Training Simulator Fidelity: A Research Plan. Technical Report 558.

    ERIC Educational Resources Information Center

    Baum, David R.; And Others

    This report presents a research plan to guide the determination of the empirical relationship between level of maintenance training simulator fidelity and training effectiveness. Chapter I describes data collection and analysis activities undertaken to provide guidance for fidelity decision making by the training simulator development community.…

  1. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  2. Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho

    USGS Publications Warehouse

    Packard, F.A.

    1996-01-01

    To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.

  3. NASA Engineering Excellence: A Case Study on Strengthening an Engineering Organization

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert; Wessel, Vernon W.

    2006-01-01

    NASA implemented a system of technical authority following the Columbia Accident Investigation Board (CAE) report calling for independent technical authority to be exercised on the Space Shuttle Program activities via a virtual organization of personnel exercising specific technical authority responsibilities. After the current NASA Administrator reported for duty, and following the first of two planned "Shuttle Return to Flight" missions, the NASA Chief Engineer and the Administrator redirected the Independent Technical Authority to a program of Technical Excellence and Technical Authority exercised within the existing engineering organizations. This paper discusses the original implementation of technical authority and the transition to the new implementation of technical excellence, including specific measures aimed at improving safety of future Shuttle and space exploration flights.

  4. Man in the North Technical Paper. Education in the Canadian North, Report Two: Apprentice Teachers.

    ERIC Educational Resources Information Center

    Brown, Doug; And Others

    The objective of this applied research project was to evaluate a formula by which young native Canadians would become teachers through in-service training coupled with academic upgrading. The experiment design paired apprentice and cooperating teachers, provided technical help, planned a schedule of activities for the apprentice, and assessed the…

  5. Loads and aeroelasticity division research and technology accomplishments for FY 1982 and plans for FY 1983

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.

    1983-01-01

    Accomplishments of the past year and plans for the coming year are highlighted as they relate to five year plans and the objectives of the following technical areas: aerothermal loads; multidisciplinary analysis and optimization; unsteady aerodynamics; and configuration aeroelasticity. Areas of interest include thermal protection system concepts, active control, nonlinear aeroelastic analysis, aircraft aeroelasticity, and rotorcraft aeroelasticity and vibrations.

  6. [The plan for prevention of obesity of ASL RMB, Italy].

    PubMed

    Cairella, G; Ciaralli, F; Mangia, M L; Olivieri, L; Auriemma, P; Casagni, L; Castronuovo, E; ASL RMB Italy

    2009-01-01

    Lazio District, by pointing out the guidelines of the "Obesity and Overweight for Lazio District Plan" (DGR no1166, 23/12/05), enacts the "National Prevention Plan 2005-2007". The Public Health Service for Food and Nutrition has been the main player of the Plan; the District and Department of Health of the District had a technical and organizational support role. Within the development of the Plan for prevention of obesity of ASL RMB, a technical multidisciplinary group was constituted and three more programs were developed, all of them were dedicated to promotion and support of breast-feeding, prevention of obesity and overweight in childhood and adulthood. The educational activity concerning promotion and support of breast-feed ing actively involved operators from consultory rooms and hospital staff from ASL. The reports about nutritional surveillance allowed a careful analysis of the service conditions and priorities. Special criticality facets have been pointed out such as the high prevalence of overweight (31%) and obesity (7%), the habit of skipping breakfast, a low fruit and vegetables consumption, a generally sedentary lifestyle and, during the intervention, the parents' low involvement. In geriatric age cases, a high malnutrition risk both for overnutrition and undernutrition was found in the elderly groups that were checked; the diets' nutritional density as well as the physical activity aspect recover an important role in the intervention planning. Moreover the discussions with catering companies were an important aspect in order to make several target groups aware. The globally considered experience highlighted positive elements of mobilization, consensus, reorientation of activities and resources, giving proof of the significance of integration concerning specifical aims of different company services. Nevertheless, the carrying on of such activities needs resource investments in the specifical area and enlargement of activities especially for the multisector-based efforts.

  7. Statement by Dr. Raul A. Deju to the Subcommittee on Radioactive Waste, Energy and Utilities Committee, Washington State Senate, Richland, Washington, October 21, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deju, R.A.

    1982-10-01

    The Basalt Waste Isolation Project's mission is to assess whether or not a nuclear waste repository can be sited in the basalts beneath the Hanford Site. Dr. Deju summarizes the results of the siting studies, the activities connected with waste package development, and ongoing engineering studies. In addition, he gives a glimpse of past technical reviews of the project and comments on major technical activities planned in the near future.

  8. Health Activities for Primary School Students.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    This manual targets new and second-year Peace Corps volunteers, presenting health lessons and activities for primary school students in Thailand. Each section of the manual outlines basic technical information about the topic, contains several detailed lesson plans, and lists quick activities that can be carried out at schools. Songs and recipes…

  9. A Feasibility and Engineering Study of Extending Cable TV Programming to Surrounding Communities. Planning Grant Report.

    ERIC Educational Resources Information Center

    Lakeshore Technical Inst., Cleveland, WI.

    This report chronicles planning grant activities undertaken by the Lakeshore Technical Institute (LTI) and documents findings of a study to determine the feasibility and costs of extending public and educational programs from the LTI campus in Cleveland, Wisconsin, to surrounding communities. The geographic service area, regional…

  10. 78 FR 29338 - Applications for New Award; Technical Assistance To Improve State Data Capacity-National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... formative and summative evaluations of the project; Note: The following Web site provides more information... plan, linked to the project's logic model, for a formative evaluation of the project's activities. The plan must describe how the formative evaluation will use clear performance objectives to ensure...

  11. Higher Education. Lifelong Learning and Community Service: A Profile of Action and Responsibility.

    ERIC Educational Resources Information Center

    Champagne, Joseph E.

    Two projects, designed to serve as technical input to the developing Texas State Plan for Higher Continuing Education, focused on: (1) enrollment trends and needs, institutional activities, and statewide planning across the nation; and (2) higher education and community services. Both projects involved extensive survey work of institutional visits…

  12. Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian

    2000-01-01

    This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

  13. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  14. Achieving Effective Risk Management Reduction Throughout Decommissioning at the Columbus Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.D.

    2006-07-01

    Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burton, J. C.; Environmental Research

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at severalmore » former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling. Data from the various activities are reduced and interpreted each day by the technical staff. Various computer programs are used to visualize and integrate the data. However, people do the data interpretation and integration, not the computers, which are just one more tool at the site. At the end of the day, the staff members meet, review results, and modify the next day's program as necessary to optimize activities that are generating overlapping or confirming site details. Data are not arbitrarily discarded -- each finding must be explained and understood. Anomalous readings may be due to equipment malfunctions, laboratory error, or the inability of a technique to work in a given setting. The suite of selected technologies is adjusted in the field if necessary. (6) The end result of this process is the optimization of the field activity to produce a high-quality technical product that is cost and time effective.« less

  16. 24 CFR 570.704 - Application requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... housing needs. The plan must set forth the public entity's policies and procedures for: (i) Giving... for activities that will benefit low and moderate income persons; (D) The proposed activities likely... technical assistance to groups representative of persons of low and moderate income that request assistance...

  17. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  18. Manpower Planning, Occupational Education, and the Decision to Participate in the Labor Force. DASP Technical Paper No. 2.

    ERIC Educational Resources Information Center

    Kaufman, Jacob J.; Sumansky, John M.

    The report examines the multiplicity of factors which influence the labor market activity of the population and explores the implications of changes in those influential factors with regard to manpower and educational planning policy. The first section contains the introduction to the problem, summary of factors affecting labor force…

  19. Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lum, Clinton C. L.

    This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less

  20. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  1. Organizing and Establishing a Media and Research Services Center in a Secondary Vocational-Technical School: Procedures, Activities, Conclusions.

    ERIC Educational Resources Information Center

    Minter, Anne

    Intended both as a report on an Elementary and Secondary Education Act of 1965 (ESEA) Title IV project and as a guide for others wishing to initiate centralized media services in vocational-technical schools, this document describes the planning, funding, establishment, and the 1980 to 1983 operations of the Natchez Vocational Media and Research…

  2. Technical Handbook for Facilities Engineering and Construction Manual, Part 2: Federally Assisted Activities. Guide for Project Applicants-Construction Management Services. Department Technical Handbook Series.

    ERIC Educational Resources Information Center

    Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.

    This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…

  3. Changes in DSTO Support to Projects Arising From the 6th July 2006 DCIC Decision: Updated Guidance for Project S&T Plans

    DTIC Science & Technology

    2007-02-01

    responsible to the Government for certifying these technical risks [4] and [5] The current funding model for Project S&T Plans is: • Pre-First...the new costing spreadsheets at Annexes C-E. 3.1 A complete set of S&T Activities The 6th July 2006 DCIC decisions to change the funding model increase...changes to the funding model mean that the set of S&T Activities in the Project S&T Plans will need to be categorised in new ways to fit in with the

  4. Evaluating SPP/APR Improvement Activities

    ERIC Educational Resources Information Center

    National Early Childhood Technical Assistance Center (NECTAC), 2009

    2009-01-01

    This document is intended to assist State Education Agency (SEA) and Lead Agency (LA) staff and technical assistance providers in designing a meaningful evaluation for the State Performance Plan (SPP)/Annual Performance Report (APR) improvement activities. It provides: (1) information about the relevance of evaluation in the context of improvement…

  5. Hanford Site Composite Analysis Technical Approach Description: Groundwater Pathway Dose Calculation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morgans, D. L.; Lindberg, S. L.

    The purpose of this technical approach document (TAD) is to document the assumptions, equations, and methods used to perform the groundwater pathway radiological dose calculations for the revised Hanford Site Composite Analysis (CA). DOE M 435.1-1, states, “The composite analysis results shall be used for planning, radiation protection activities, and future use commitments to minimize the likelihood that current low-level waste disposal activities will result in the need for future corrective or remedial actions to adequately protect the public and the environment.”

  6. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  7. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  8. Hawaiian Cultural Research: Some Applications and Some Cautions. Technical Report #25.

    ERIC Educational Resources Information Center

    Mays, Violet

    This report presents an early statement of community and family research plans and activities of the Kamehameha Early Education Program (KEEP) and suggested criteria for non-exploitative cross-cultural research among Hawaiians. Research activities include the study of the linguistic behavior and interaction styles of Hawaiian children and…

  9. The Chancellor's Biennial Report: Two Years of Progress, 1983-85.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Postsecondary Education, Montgomery.

    This report summarizes the activities and accomplishments of Alabama's community, junior, and technical college system for 1983 to 1985. Following an introduction by the chancellor, Charles L. Payne, the report highlights major achievements in the following areas: (1) strategic planning and management, covering activities related to critical…

  10. Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental, LLC

    2009-09-01

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  11. Economic Planning for Multicounty Rural Areas: Application of a Linear Programming Model in Northwest Arkansas. Technical Bulletin No. 1653.

    ERIC Educational Resources Information Center

    Williams, Daniel G.

    Planners in multicounty rural areas can use the Rural Development, Activity Analysis Planning (RDAAP) model to try to influence the optimal growth of their areas among different general economic goals. The model implies that best industries for rural areas have: high proportion of imported inputs; low transportation costs; high value added/output…

  12. Information Resources Management. A Bibliography with Indexes, 1984-1989. A Selection of Annotated References to Reports and Journal Articles Entered into the NASA Scientific and Technical Information System from 1984 through 1989.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC. Scientific and Technical Information Branch.

    This information resources management (IRM) bibliography provides abstracts of reports and journal articles entered in the National Aeronautics and Space Administration (NASA) scientific and technical information system over a 6-year period. These abstracts are presented in 10 areas: (1) IRM activities and planning; (2) computers,…

  13. Ethiopia's assessment of emergency obstetric and newborn care: setting the gold standard for national facility-based assessments.

    PubMed

    Keyes, Emily B; Haile-Mariam, Abonesh; Belayneh, Neghist T; Gobezie, Wasihun A; Pearson, Luwei; Abdullah, Muna; Kebede, Henok

    2011-10-01

    To describe the methods used to implement Ethiopia's 2008 emergency obstetric and newborn care services (EmONC) assessment; highlight how the collaborative process contributed to immediate integration of results into national and subnational planning; and explain how the experience informed the development of a set of tools providing best practices and guidelines for other countries conducting similar assessments. A team of maternal and newborn health experts from the Federal Ministry of Health (FMOH), the United Nations Children's Fund (UNICEF), the World Health Organization (WHO), and the United Nations Population Fund (UNFPA), together with representatives from the Ethiopian Society of Obstetricians and Gynecologists, provided technical guidance for the 18-month process and facilitated demand for and use of the assessment results. Eighty-four trained data collectors administered 9 data collection modules in 806 public and private facilities. Field work and data were managed by a private firm who, together with the core team, implemented a multi-layered plan for data quality. Columbia University's Averting Maternal Death and Disability Program provided technical assistance. Results were published in national and regional reports and in 1-page facility factsheets informing subnational planning activities. Assessment results-which have been published in journal articles-informed water infrastructure improvements, efforts to expand access to magnesium sulfate, and FMOH and UN planning documents. The assessment also established a permanent database for future monitoring of the health system, including geographic locations of surveyed facilities. Ethiopia's assessment was successful largely because of active local leadership, a collaborative process, ample financial and technical support, and rapid integration of results into health system planning. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  14. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  16. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael G.

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  17. Technical Assessment of the National Full Scale Aerodynamic Complex Fan Blades Repair

    NASA Technical Reports Server (NTRS)

    Young, Clarence P., Jr.; Dixon, Peter G.; St.Clair, Terry L.; Johns, William E.

    1998-01-01

    This report describes the principal activities of a technical review team formed to address National Full Scale Aerodynamic Complex (NFAC) blade repair problems. In particular, the problem of lack of good adhesive bonding of the composite overwrap to the Hyduliginum wood blade material was studied extensively. Description of action plans and technical elements of the plans are provided. Results of experiments designed to optimize the bonding process and bonding strengths obtained on a full scale blade using a two-step cure process with adhesive primers are presented. Consensus recommendations developed by the review team in conjunction with the NASA Ames Fan Blade Repair Project Team are provided along with lessons learned on this program. Implementation of recommendations resulted in achieving good adhesive bonds between the composite materials and wooden blades, thereby providing assurance that the repaired fan blades will meet or exceed operational life requirements.

  18. Educational and technical assistance to CMV drivers and motor carriers

    DOT National Transportation Integrated Search

    2011-08-01

    This report presents the test plan for collecting and analyzing information on outreach activities, media coverage, and establishment of the partnership for the projects comprising the Atlanta Congestion Reduction Demonstration (CRD) under the United...

  19. 2015 Consequence Management Advisory Division's (CMAD) Annual Report

    EPA Pesticide Factsheets

    CMAD annual report for 2015 which covers activities such as providing technical support to the Ebola response decontamination planning and preparation efforts; the ricin responses in Regions 5 and 6; the Burkholderia pseudomallei response in Region.

  20. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  1. Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1

    NASA Technical Reports Server (NTRS)

    Estes, Ronald H. (Editor)

    1993-01-01

    This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.

  2. Avionics Simulation, Development and Software Engineering

    NASA Technical Reports Server (NTRS)

    2002-01-01

    During this reporting period, all technical responsibilities were accomplished as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14), the MSFC EXPRESS Project Office (FD31), and the Huntsville Boeing Company. Accomplishments included: performing special tasks; supporting Software Review Board (SRB), Avionics Test Bed (ATB), and EXPRESS Software Control Panel (ESCP) activities; participating in technical meetings; and coordinating issues between the Boeing Company and the MSFC Project Office.

  3. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  4. The Apollo experiment for document delivery via satellite communication

    NASA Astrophysics Data System (ADS)

    1985-03-01

    Dutch participation possibilities in the Apollo document delivery project, wishes and idea's of potential user and tender groups, and plans and activities of Dutch institutes and companies, are surveyed. The Apollo storage and transport system, demand and administration network, potential markets, and subject areas of the documents are investigated. Utilization areas (scientific, technical, administration, and business information) are listed. High tariffs and the lack of necessary provision make a direct participation strategy impossible. However, in the experimental phase, Dutch companies must be allowed to contribute in technical developments and availability of organizational and technical facilities must be stimulated.

  5. Environmental Justice analysis in Hydraulic Fracturing Analysis, June 13, 2011

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study, using an index-based approach to compare a nationally representative set of well sites fractured.

  6. 7 CFR 4284.902 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... economic planning activities to determine the viability of a potential value-added venture, and... and sufficient to evidence the viability of the venture. It may also contain background information... analysis by a qualified consultant of the economic, market, technical, financial, and management...

  7. 7 CFR 4284.902 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... economic planning activities to determine the viability of a potential value-added venture, and... and sufficient to evidence the viability of the venture. It may also contain background information... analysis by a qualified consultant of the economic, market, technical, financial, and management...

  8. 7 CFR 4284.902 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... economic planning activities to determine the viability of a potential value-added venture, and... and sufficient to evidence the viability of the venture. It may also contain background information... analysis by a qualified consultant of the economic, market, technical, financial, and management...

  9. 77 FR 11142 - Agency Information Collection Activities: Proposed Collection; Comment Request, State/Local...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ..., and to establish a coordinated process to implement the plan, taking advantage of a wide-range of... maintenance costs for technical services. There are no annual start-up or capital costs. The estimated annual...

  10. Technical Assistance Plan (TAP)

    EPA Pesticide Factsheets

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  11. Lincoln Advanced Science and Engineering Reinforcement (LASER) program

    NASA Technical Reports Server (NTRS)

    Williams, Willie E.

    1989-01-01

    Lincoln University, under the Lincoln Advanced Science and Engineering Reinforcement (LASER) Program, has identified and successfully recruited over 100 students for majors in technical fields. To date, over 70 percent of these students have completed or will complete technical degrees in engineering, physics, chemistry, and computer science. Of those completing the undergraduate degree, over 40 percent have gone on to graduate and professional schools. This success is attributable to well planned approaches to student recruitment, training, personal motivation, retention, and program staff. Very closely coupled to the above factors is a focus designed to achieve excellence in program services and student performance. Future contributions by the LASER Program to the pool of technical minority graduates will have a significant impact. This is already evident from the success of the students that began the first year of the program. With program plans to refine many of the already successful techniques, follow-on activities are expected to make even greater contributions to the availability of technically trained minorities. For example, undergraduate research exposure, broadened summer, and co-op work experiences will be enhanced.

  12. Resource Planning Model | Energy Analysis | NREL

    Science.gov Websites

    balancing authority. An image of a overlapping circles labelled Resource, Technical, Economic, and Market competing electricity technologies. An image of a overlapping circles labelled Resource, Technical, Economic ; Federal Resource Planning. Volume 1: Sectoral, Technical, and Economic Trends, NREL Technical Report (2016

  13. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  14. A temporal importance-performance analysis of recreation attributes on national forests: a technical document supporting the Forest Service update of the 2010 RPA Assessment

    Treesearch

    Ashley E. Askew; J.M. Bowker; Donald B.K. English; Stanley J. Zarnoch; Gary T. Green

    2017-01-01

    The outdoor recreation component of the 2010 Resources Planning Act (RPA) Assessment provided projections and modeling of participation and intensity by activity. Results provided insight into the future of multiple outdoor recreation activities through projections of participation rates, numbers of participants, days per participant, and total activity days. These...

  15. Methodology for Planning Technical Education: With a Case Study of Polytechnics in Bangladesh.

    ERIC Educational Resources Information Center

    Ritzen, Jozef M.; Balderston, Judith B.

    A product of research first begun by one of the authors in Bangladesh, this book develops a comprehensive set of methods for planning technical education. Wherever possible, the authors draw on existing tools, fitting them to the specific context of technical education. When faced with planning problems for which existing methods are ill suited…

  16. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission... planning efficiency through improved software. [[Page 27342

  17. TECHNICAL SUPPORT TO NASA

    EPA Science Inventory

    The Pluto-New Horizon Mission will use a radioisotope thermoelectric generator fueled by plutonium-238 to provide electric power for the scientific instruments. This activity plans for actions to be taken if there is a malfunction during the launch. Also, EPA's RPD provided tec...

  18. Cumulative watershed effects of fuels management: a western synthesis

    Treesearch

    Robert Rummer

    2006-01-01

    Fuels management is an active term. It is an intentional, planned activity defined by consideration of fire behavior, silvicultural principles, ecological constraints, and the economic and technical limitations of the tools selected to implement the treatment. A forest operation is a tool used to manipulate vegetation or site condition in order to achieve some desired...

  19. MHD program plan, FY 1991

    NASA Astrophysics Data System (ADS)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  20. INDOT Technical Training Plan

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  1. Minnesota Area Vocational-Technical Institutes. A Plan to Address Declining Enrollments and Resources. Submitted to the Minnesota State Legislature

    ERIC Educational Resources Information Center

    Minnesota State Board for Vocational Education, St. Paul.

    In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…

  2. 75 FR 16499 - Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...

  3. Active microwave users working group program planning

    NASA Technical Reports Server (NTRS)

    Ulaby, F. T.; Bare, J.; Brown, W. E., Jr.; Childs, L. F.; Dellwig, L. F.; Heighway, J. E.; Joosten, R.; Lewis, A. J.; Linlor, W.; Lundien, J. R.

    1978-01-01

    A detailed programmatic and technical development plan for active microwave technology was examined in each of four user activities: (1) vegetation; (2) water resources and geologic applications, and (4) oceanographic applications. Major application areas were identified, and the impact of each application area in terms of social and economic gains were evaluated. The present state of knowledge of the applicability of active microwave remote sensing to each application area was summarized and its role relative to other remote sensing devices was examined. The analysis and data acquisition techniques needed to resolve the effects of interference factors were reviewed to establish an operational capability in each application area. Flow charts of accomplished and required activities in each application area that lead to operational capability were structured.

  4. 15 CFR 291.3 - Environmental tools and techniques projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... demonstrated access to relevant technical or information sources external to the organization. (3) Degree of.... Applicants should specify plans for proper organization, staffing, and management of the implementation... managing organization to conduct the proposed activities; qualifications of the project team and its...

  5. Gian Porro | NREL

    Science.gov Websites

    Technical Risk Analysis for the Geothermal Technologies ProgramPDF. Golden, CO: National Renewable Energy analysis and planning activities (PAE Hub) Research Interests Analytical support to Geothermal Technologies Program, including assessment of the competitiveness of geothermal electricity generation Investigation of

  6. Organization Development: Concept, Process, and Applications in the Department of Defense

    DTIC Science & Technology

    1989-04-01

    collection, the consultant performs an organizational diagnosis in which the focus is on identifying ways to improve the technical, administrative, and...dynamics, and organizational diagnosis . 2. Action/Planning Workshops. This activity consisted of management conferences and management/worker conferences

  7. Technical Basis for Electromagnetic Compatibility Regulatory Guidance Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ewing, Paul D.; Korsah, Kofi; Harrison, Thomas J.

    2016-03-01

    The objective of this report is to serve as the technical basis document for the next, planned revision of this RG that highlights and provides the rationale for the recommended changes. The structure of this document follows and summarizes the several assessment activities undertaken during the course of this project to evaluate new and updated electromagnetic compatibility (EMC) standards, testing methods and limits, and relevant technology developments being incorporated into plant activities that may have EMI/RFI implications, as well as other specific issues, including impacts of electrostatic discharge (ESD) on safety equipment and impacts on increased usage of wireless devicesmore » in nuclear power plants.« less

  8. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  9. [Carry forward the successes].

    PubMed

    1983-02-27

    Achievements of the National Publicity Month on Family Planning in China came about for the following reasons: the Party Central Committee and the State Council formulated correct principles and policies and party committees and governments at all levels strengthened their leadership; the people, particularly the peasants, responded enthusiastically to the calls and actively began to practice family planning; and all relevant departments along with the staff in family planning and medical units actively participated in the work. Recognizing the achievements of the publicity month, it is necessary to acknowledge the fact that work in family planning continues to be a longterm and arduous effort. China is entering a 15-year period of peak fertility. Each year 20 million couples will be entering the marriage and fertility age, and the slightest relaxation in birth planning will result in great swells in population and irrevocable consequences. Efforts cannot be relaxed. It is essential to keep up the momentum generated by the publicity month and to expand achievements. An important experience gained in the publicity month is that all localities should form 3 contingents of people: a publicity contingent; a technical contingent; and an activist continent. Their efforts are the guarantee to success in family planning. Thus far, China has trained 15 million publicity workers and 750,000 technical personnel. Large numbers of activists have also emerged from among the people. It is important to continue to educate the people. Experience shows that an effective method is to demonstrate possible results with specific calculations and make comparisons. Explaining Chinese realities and possible consequences without family planning should help the peasants to understand the relationship between family planning and the future of China. Publicity and education must be integrated with implementation of birth control measures. Specific guidance on how to practice birth control must be provided.

  10. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shoaf, C.R.; Guth, D.J.

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1more » ref., 2 figs.« less

  12. Future Spacelift Requirements Study

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This study addresses future space applications and the derived requirements these potential applications will have on future spacelift systems. This NASA sponsored activity is a comprehensive study of potential missions including those of the military, civil, and commercial users. The study objectively evaluated the key architectural requirements for future launch systems. The results of this study are technical, economic, and policy analyses of future spacelift systems. It is intended to assist NASA and DOD decision-makers in planning technical investments and establishing policy for future U.S. spacelift systems.

  13. INDOT Technical Training Plan : Appendix B

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  14. INDOT Technical Training Plan : Appendix M

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  15. INDOT Technical Training Plan : Appendix P

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  16. INDOT Technical Training Plan : Appendix F

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  17. INDOT Technical Training Plan : Appendix H

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  18. INDOT Technical Training Plan : Appendix E

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  19. INDOT Technical Training Plan : Appendix O

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  20. INDOT Technical Training Plan : Appendix J

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  1. INDOT Technical Training Plan : Appendix L

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  2. INDOT Technical Training Plan : Appendix A

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  3. INDOT Technical Training Plan : Appendix D

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  4. INDOT Technical Training Plan : Appendix K

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  5. INDOT Technical Training Plan : Appendix G

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  6. INDOT Technical Training Plan : Appendix I

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  7. INDOT Technical Training Plan : Appendix N

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  8. INDOT Technical Training Plan : Appendix C

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  9. Reform of China's Technical and Vocational Education in the Transition from a Planned Economy System to a Socialist Market Economy System--A Case Study. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Yu, Zuguang; Zeng, Zida

    Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…

  10. NASA Space Environments Technical Discipline Team Space Weather Activities

    NASA Astrophysics Data System (ADS)

    Minow, J. I.; Nicholas, A. C.; Parker, L. N.; Xapsos, M.; Walker, P. W.; Stauffer, C.

    2017-12-01

    The Space Environment Technical Discipline Team (TDT) is a technical organization led by NASA's Technical Fellow for Space Environments that supports NASA's Office of the Chief Engineer through the NASA Engineering and Safety Center. The Space Environments TDT conducts independent technical assessments related to the space environment and space weather impacts on spacecraft for NASA programs and provides technical expertise to NASA management and programs where required. This presentation will highlight the status of applied space weather activities within the Space Environment TDT that support development of operational space weather applications and a better understanding of the impacts of space weather on space systems. We will first discuss a tool that has been developed for evaluating space weather launch constraints that are used to protect launch vehicles from hazardous space weather. We then describe an effort to better characterize three-dimensional radiation transport for CubeSat spacecraft and processing of micro-dosimeter data from the International Space Station which the team plans to make available to the space science community. Finally, we will conclude with a quick description of an effort to maintain access to the real-time solar wind data provided by the Advanced Composition Explorer satellite at the Sun-Earth L1 point.

  11. Megan Day | NREL

    Science.gov Websites

    research, analysis, and technical assistance on municipal energy planning and policy, utility-scale Baseline Analysis of Municipal Codification across the U.S., NREL Technical Report (2016) Navajo Generating Station & Federal Resource Planning - Volume 1: Sectoral, Technical, and Economic Trends, NREL

  12. Shifting Resources and Focus to Meet the Goals of the National HIV/AIDS Strategy: The Enhanced Comprehensive HIV Prevention Planning Project, 2010–2013

    PubMed Central

    Purcell, David W.; Fisher, Holly H.; Belcher, Lisa; Carey, James W.; Courtenay-Quirk, Cari; Dunbar, Erica; Eke, Agatha N.; Galindo, Carla A.; Glassman, Marlene; Margolis, Andrew D.; Neumann, Mary Spink; Prather, Cynthia; Stratford, Dale; Taylor, Raekiela D.; Mermin, Jonathan

    2016-01-01

    In September 2010, CDC launched the Enhanced Comprehensive HIV Prevention Planning (ECHPP) project to shift HIV-related activities to meet goals of the 2010 National HIV/AIDS Strategy (NHAS). Twelve health departments in cities with high AIDS burden participated. These 12 grantees submitted plans detailing jurisdiction-level goals, strategies, and objectives for HIV prevention and care activities. We reviewed plans to identify themes in the planning process and initial implementation. Planning themes included data integration, broad engagement of partners, and resource allocation modeling. Implementation themes included organizational change, building partnerships, enhancing data use, developing protocols and policies, and providing training and technical assistance for new and expanded activities. Pilot programs also allowed grantees to assess the feasibility of large-scale implementation. These findings indicate that health departments in areas hardest hit by HIV are shifting their HIV prevention and care programs to increase local impact. Examples from ECHPP will be of interest to other health departments as they work toward meeting the NHAS goals. PMID:26843670

  13. Special report: workshop on 4D-treatment planning in actively scanned particle therapy--recommendations, technical challenges, and future research directions.

    PubMed

    Knopf, Antje; Bert, Christoph; Heath, Emily; Nill, Simeon; Kraus, Kim; Richter, Daniel; Hug, Eugen; Pedroni, Eros; Safai, Sairos; Albertini, Francesca; Zenklusen, Silvan; Boye, Dirk; Söhn, Matthias; Soukup, Martin; Sobotta, Benjamin; Lomax, Antony

    2010-09-01

    This article reports on a 4D-treatment planning workshop (4DTPW), held on 7-8 December 2009 at the Paul Scherrer Institut (PSI) in Villigen, Switzerland. The participants were all members of institutions actively involved in particle therapy delivery and research. The purpose of the 4DTPW was to discuss current approaches, challenges, and future research directions in 4D-treatment planning in the context of actively scanned particle radiotherapy. Key aspects were addressed in plenary sessions, in which leaders of the field summarized the state-of-the-art. Each plenary session was followed by an extensive discussion. As a result, this article presents a summary of recommendations for the treatment of mobile targets (intrafractional changes) with actively scanned particles and a list of requirements to elaborate and apply these guidelines clinically.

  14. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  15. Benefit transfer of outdoor recreation use values: A technical document supporting the Forest Service Strategic Plan (2000 revision)

    Treesearch

    Randall S. Rosenberger; John B. Loomis

    2001-01-01

    We present an annotated bibliography that provides information on and reference to the literature on outdoor recreation use valuation studies. This information is presented by study source, benefit measures, recreation activity, valuation methodology, and USDA Forest Service region. Tables are provided that reference the bibliography for each activity, enabling easy...

  16. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  17. 75 FR 70966 - Transit Asset Management (TAM) Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... interoperability between diverse types of information technology systems through use of open data formats and... to develop asset management plans, technical assistance, data collection and a pilot program as... condition assessment methodologies, as well as new data collection and analysis activities. $3 million has...

  18. 24 CFR 1006.430 - Corrective and remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... plan; (3) Made substantial progress in carrying out its program and achieving its quantifiable goals as... to submit progress schedules for completing activities or complying with the requirements of the Act... appropriate technical assistance using existing grant funds or other available resources to overcome the...

  19. Charlotte Circle Outreach. Final Report.

    ERIC Educational Resources Information Center

    Calhoun, Mary Lynne; Rose, Terry L.; Prendergast, Donna

    This final report details the activities of the Charlotte Circle Outreach, a program designed to provide technical assistance and training to early intervention programs offering services to infants and young children with substantial disabilities, ages birth through two years. This mission was accomplished through cooperative planning with…

  20. Applying a Continuous Quality Improvement Model To Assess Institutional Effectiveness.

    ERIC Educational Resources Information Center

    Roberts, Keith

    This handbook outlines techniques and processes for improving institutional effectiveness and ensuring continuous quality improvement, based on strategic planning activities at Wisconsin's Milwaukee Area Technical College (MATC). First, institutional effectiveness is defined and 17 core indicators of effectiveness developed by the Wisconsin…

  1. Evaluation and demonstration of commercialization potential of CCSI tools within gPROMS advanced simulation platform

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawal, Adekola; Schmal, Pieter; Ramos, Alfredo

    PSE, in the first phase of the CCSI commercialization project, set out to identify market opportunities for the CCSI tools combined with existing gPROMS platform capabilities and develop a clear technical plan for the proposed commercialization activities.

  2. 1995 Truck Size and Weight Performance-Based Workshop report : activity 5 : document North American and European experiences

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  3. High performance concrete in Washington state SR 18/SR 516 overcrossing : interim report on girder monitoring

    DOT National Transportation Integrated Search

    1999-04-30

    This report documents a sample of heavy-duty truck activity. This research effort was originated by the Planning and Technical Support Division of the California Air Resources Board (CARB) and jointly supported by the Federal Highway Administration (...

  4. Presentation Of Comparative Data for Transportation Planning Studies

    DOT National Transportation Integrated Search

    1997-01-01

    Clear, yet detailed, presentations of transportation planning data to lay groups as well as to technical groups is becoming more and more of a necessity in the planning process. Presentation of technical information in understandable terms has become...

  5. 7 CFR 4284.621 - Eligible grant purposes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... by providing technical assistance for business development and economic development planning. Grant...-county economic development planning; (5) Establish centers for training, technology, and trade that will... professional services necessary to conduct the technical assistance, training, or planning functions. (b...

  6. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less

  7. New Directions for High School Career and Technical Education in Wyoming: A Strategic Plan

    ERIC Educational Resources Information Center

    Hoachlander, Gary; Klein, Steven; Studier, Carol

    2007-01-01

    This report offers a plan for improving career and technical education (CTE) in Wyoming, but it is about more than just technical education. Realizing the potential of CTE to contribute to students' mastery of both academic and technical knowledge depends not only on strengthening the CTE curriculum, but also on embedding CTE in a larger program…

  8. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    ERIC Educational Resources Information Center

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  9. National Planning of Vocational and Technical Training. Colombo Plan Seminar. (Thimphu, Bhutan, April 19-22, 1976)

    ERIC Educational Resources Information Center

    Colombo Plan Bureau (Sri Lanka).

    Focusing on the last in a series of seven seminars conducted by the Colombo Plan Bureau between 1969 and 1975 on the theme, "National Planning of Vocational and Technical Training," this report presents the proceedings of a seminar on the vocational education and training needs of one of the Colombo Plan members, Bhutan. Five working…

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  11. Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.

    ERIC Educational Resources Information Center

    May, Susan A.

    This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…

  12. Hydrologic Instrumentation Facility of the U.S. Geological Survey, annual report for fiscal year 1993

    USGS Publications Warehouse

    Latkovich, V.J.; Tracey, Debra C.

    1994-01-01

    The Hydrologic lnstrumentation Facility (HIF) of the U.S. Geological Survey (USGS) has nationwide responsibility for all aspects of hydrologic field instrumentation in support of Survey data-collection programs. Each year the HIF publishes a report to inform Water Resources Division (WRD) personnel of progress made by the HIF in fulfilling its mission to improve instrumentation services to the Division. The report for fiscal year 1993 (FY93) describes the activities of the HIF, including major accomplish- ments for the year; personnel actions; active projects (reported by section--Technical Services Section, Administrative Services Section, Field Coordination, Applications and Development Section, Test and Evaluation Section, Field Service and Supply Section); and planned activities for the coming year. Also presented in the appendixes are detailed listings of the memberships of the Instrumentation Committee and the Instrumentation Technical Advisory Subcommittee; district, sub- district, and field office visits by HIF personnel; professional and technical meetings attended by HIF personnel; vendor visits; and reports prepared by HIF personnel.

  13. Methods and Models of the Hanford Internal Dosimetry Program, PNNL-MA-860

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-30

    The Hanford Internal Dosimetry Program (HIDP) provides internal dosimetry support services for operations at the Hanford Site. The HIDP is staffed and managed by the Radiation and Health Technology group, within the Pacific Northwest National Laboratory (PNNL). Operations supported by the HIDP include research and development, the decontamination and decommissioning of facilities formerly used to produce and purify plutonium, and waste management activities. Radioelements of particular interest are plutonium, uranium, americium, tritium, and the fission and activation product radionuclides 137Cs, 90Sr, and 60Co. This manual describes the technical basis for the design of the routine bioassay monitoring program and formore » assessment of internal dose. The purposes of the manual are as follows: • Provide assurance that the HIDP derives from a sound technical base. • Promote the consistency and continuity of routine program activities. • Provide a historical record. • Serve as a technical reference for radiation protection personnel. • Aid in identifying and planning for future needs.« less

  14. Western U.S.-Canada crossborder case study : activity 2 : task D : conduct regional and local trucking case studies

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  15. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  16. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  17. OSH technical reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less

  18. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  19. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Hackenberg, Davis L.

    2016-01-01

    UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

  20. Programming of Urban Revitalization

    NASA Astrophysics Data System (ADS)

    Biliński, Tadeusz

    2016-12-01

    The planning stage of the investment-construction process is of a crucial importance. Its overall impact on the costs, construction time and the quality of design solutions is huge. However, in practice, little attention is given to this pre-design stage, except for public buildings or other buildings of particular importance. In consequence, the results of investment and construction activities are unsatisfactory. Therefore, the issue has been given careful consideration in this paper. The paper discusses the issue of programming urban revitalization, emphasizing its socio-economic importance. To illustrate the complexity of revitalization projects planning, the author draws attention to social, economic, technical and organisational factors, such as public participation, reorganization and revaluation of land use planning, rationalization of energy use, organization and management of revitalization processes, as well as technical progress. Summarising the paper, the author concludes that in order to improve the quality of life of town residents and to protect material national heritage, it is indispensable to continuously revitalize subsequent town areas.

  1. 77 FR 41132 - Air Quality Implementation Plans; Alabama; Attainment Plan for the Alabama Portion of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... modeling demonstration should include supporting technical analyses and descriptions of all relevant....5 and NO X . The attainment demonstration includes: Technical analyses that locate, identify, and... modeling analysis is a complex technical evaluation that began with selection of the modeling system. The...

  2. 76 FR 14584 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Attainment Plan for Libby...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... the timeframe provided in the statute. It must also include supporting technical analyses and... emissions inventory (EI), a woodstove air pollution control calculation, and a technical analysis showing... year (2010); and (2) an attainment demonstration consisting of: (a) Technical analyses that locate...

  3. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    ERIC Educational Resources Information Center

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  4. 76 FR 45589 - Notice of Submission of Proposed Information Collection to OMB; Application for Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ...: Application for Technical Assistance for Community Planning and Development (CPD) Programs. OMB Approval... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-71] Notice of Submission of Proposed Information Collection to OMB; Application for Technical Assistance for Community Planning and...

  5. Pellissippi State Technical Community College Five-Year Strategic Planning Directions, 1998-2003.

    ERIC Educational Resources Information Center

    Pellissippi State Technical Community Coll., Knoxville, TN.

    The document contains the strategic plan for Pellissippi State Technical Community College (Tennessee). The previous five-year strategic plan, "The Pathfinder Project," was prepared in 1994 but was out of date before the end of the five-year planning cycle. To secure information for projecting new five-year strategic directions and goals…

  6. 75 FR 30387 - Improving Market and Planning Efficiency Through Improved Software; Notice of Agenda and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff... planning models and software. The technical conference will be held from 8 a.m. to 5:30 p.m. (EDT) on June.... Agenda for AD10-12 Staff Technical Conference on Planning Models and Software Federal Energy Regulatory...

  7. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  8. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  9. Career Education Instructional Guide.

    ERIC Educational Resources Information Center

    State Univ. of New York, Oswego. Coll. at Oswego. Dept. of Industrial Arts and Technology.

    The guide is designed primarily for industrial arts teachers at the middle school level who wish to integrate career education into their curricula. The lessons and activities attempt to establish a balance among career information, technical information, and hands-on experience. The guide contains six lesson plans which cover the topics: the…

  10. 78 FR 18974 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... bring together experts from diverse backgrounds and experiences including electric system operators... transmission switching; AC optimal power flow modeling; and use of active and dynamic transmission ratings. In... variability of the system, including forecast error? [cir] How can outage probability be captured in...

  11. Multi-Wave Station of Solar Monitoring

    NASA Astrophysics Data System (ADS)

    Korokhin, V.; Akimov, L.; Beletsky, S.; Belkina, I.; Velikodsky, Y.; Marchenko, G.; Shaparenko, E.

    A technical description of the contemporary solar telescope of the Kharkov Astronomical Observatory (http://khassm.virtualave.net) is given, and the plan to future development is sketched. A wide range monitoring of solar activity including observations near UV range in Balmer continuum and the IR line of He 1083 nm is presented.

  12. 78 FR 13148 - Notice of Funding Availability for the Small Business Transportation Resource Center Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... individual or group counseling sessions to small businesses per month. (D) Planning Committee 1. Establish a..., counseling, marketing and outreach, and the dissemination of information, to encourage and assist small... activities such as information dissemination, small business counseling, and technical assistance with small...

  13. 77 FR 56241 - Board Meeting; October 17, 2012; Idaho Falls, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-12

    .... Nuclear Waste Technical Review Board will meet to discuss DOE work on packaging, transporting, and...) plans for the packaging, transportation, and disposition of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). Among the topics that will be discussed are current activities being undertaken by...

  14. Translating Technical Support Into Country Action: The Role of the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children in the Global Plan Era.

    PubMed

    Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R

    2017-05-01

    While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.

  15. Summary of a Gas Transport Tracer Test in the Deep Cerros Del Rio Basalts, Mesita del Buey, Los Alamos NM.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip

    Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less

  16. Educational affairs plan: A five-year strategy

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A five-year plan is presented to guide the use of NASA resources in administering a focused and consistent set of aeronautics and space science education programs. Major initiatives outlined in this plan fall into two categories: programmatic priorities and institutional priorities. Programmatic priorities for this plan include elementary education, teacher education, underrepresented minority participation, educational technology and the Aerospace Education Services Project (AESP). Institutional priorities highlighted in this plan include university programs, educational publications and their distribution, educational partnerships with public and private organizations, educational research and evaluation, and activities of the educational affairs administration. The plan's aim is to directly and indirectly help to ensure an adequate pool of talented scientists, engineers and technical personnel to keep NASA at the forefront of advancements for the 21st century.

  17. OAST Space Theme Workshop. Volume 1: Summary report. 1: Introduction. 2: General observations and some key findings. 3: Follow-on activity. Quick-look comments and working papers

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The Outlook for Space Study, consideration of National needs and OAST technology goals were factors in the selection of the following themes for candidate technical initiative and supporting program plans: space power station; search for extraterrestrial life; industrialization of space; global service station; exploration of the solar system; and advanced space transportation system. An overview is presented of the Space Theme Workshop activities in developing technology needs, program requirements, and proposed plans in support of each theme. The unedited working papers used by team members are included.

  18. Configuration Management Plan for K Basins

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weir, W.R.; Laney, T.

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less

  19. NASA STI Program Coordinating Council Eleventh Meeting: NASA STI Modernization Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The theme of this NASA Scientific and Technical Information Program Coordinating Council Meeting was the modernization of the STI Program. Topics covered included the activities of the Engineering Review Board in the creation of the Infrastructure Upgrade Plan, the progress of the RECON Replacement Project, the use and status of Electronic SCAN (Selected Current Aerospace Notices), the Machine Translation Project, multimedia, electronic document interchange, the NASA Access Mechanism, computer network upgrades, and standards in the architectural effort.

  20. Integrating an EMR-based Transition Planning Tool for CYSHCN at a Children's Hospital: A Quality Improvement Project to Increase Provider Use and Satisfaction

    PubMed Central

    Wiemann, Constance M.; Hergenroeder, Albert C.; Bartley, Krystle A.; Sanchez-Fournier, Blanca; Hilliard, Marisa E.; Warren, Laura J.; Graham, Sarah C.

    2016-01-01

    An electronic medical record (EMR)-based transition planning tool (TPT) designed to facilitate transition from pediatric to adult-based health care for youth (16–25 years) with special health care needs was introduced at a large children's hospital. Activities to increase provider use were implemented in five plan–do–study–act cycles. Overall, 22 of 25 (88%) consenting providers in four pediatric subspecialty services used the TPT during 303 patient encounters, with nurses and case-managers the top users and physicians the least likely users. Use was highest with intensive technical assistance and following the introduction of an upgraded tool. Provider satisfaction with the TPT and self-reported transition planning activities notably increased across the PDSA cycles. PMID:26209173

  1. Technical architecture of ONC-approved plans for statewide health information exchange.

    PubMed

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  2. Technical Architecture of ONC-Approved Plans For Statewide Health Information Exchange

    PubMed Central

    Barrows, Randolph C.; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor “hybrid-federated” architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches. PMID:22195059

  3. 40 CFR 52.1690 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) New York § 52.1690 Small business technical and environmental compliance assistance program. On January 11, 1993, the New York State Department of Environmental Conservation submitted a plan for the... Assistance Program for incorporation in the New York state implementation plan. This plan meets the...

  4. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  5. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  6. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  7. 76 FR 20364 - Notice of Proposed Information Collection: Comment Request; Technical Assistance for Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...

  8. Transforming South-South technical support to fight noncommunicable diseases.

    PubMed

    Shakow, Aaron D A; Bukhman, Gene; Adebona, Olumuyiwa; Greene, Jeremy; de Dieu Ngirabega, Jean; Binagwaho, Agnès

    2012-03-01

    At the UN High-Level Meeting on non-communicable diseases (NCD) in September 2011, each member state was challenged to create a multisectoral national policy and plan for the prevention and control of non-communicable disease by 2013. Few low-income countries, however, currently have such plans. Their governments are likely to turn for assistance in drafting and implementation to multilateral agencies and Contract Technical Support Organizations recommended by development partners. Yet because many NCD seen in the lowest-income countries differ significantly from those prevalent elsewhere, existing providers of external technical support may lack the necessary experience to support strategic planning for NCD interventions in these settings. This article reviews currently available mechanisms of technical support for health sector planning. It places them in the broader historical context of post- World War II international development assistance and the more recent campaigns for horizontal "South-South" cooperation and aid effectiveness. It proposes bilateral technical assistance by low income-countries themselves as the natural evolution of development assistance in health. Such programs, it argues, may be able to improve the quality of technical support to low-income countries for strategic planning in the NCD area while directing resources to the regions where they are most needed. Copyright © 2012 World Heart Federation (Geneva). Published by Elsevier B.V. All rights reserved.

  9. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    USGS Publications Warehouse

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  10. AdaNET research project

    NASA Technical Reports Server (NTRS)

    Digman, R. Michael

    1988-01-01

    The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.

  11. Summary of Current and Future MSFC International Space Station Environmental Control and Life Support System Activities

    NASA Technical Reports Server (NTRS)

    Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia

    1997-01-01

    This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.

  12. State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, July-December 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lunis, B. C.; Toth, W. J.

    The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. Background information is provided; program objectives and the technical approach that is used are discussed; and the benefits of the program are described. The summary of findings is presented. Prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are covered and findings and recommendations are summarized. The commercialization activities carried out by the respective state teams are described for the following:more » Colorado, Montana, New Mexico, North Dakota, South Dakota, Utah, and Wyoming.« less

  13. NEP systems engineering efforts in FY-92: Plans and status

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.; Gilland, James H.

    1992-01-01

    A system engineering effort has been initiated by NASA in FY-92 to define, address, and resolve issues associated with the use of Nuclear Electric Propulsion (NEP) for megawatt (MW) space propulsion applications associated with the Space Exploration Initiative (SEI). It is intended that key technical issues will be addressed by activities conducted in the early years of a project in NEP, with the objective of resolving such issues. Also, in response to more recent programmatic direction, a concept definition activity for 100 kilowatt NEP is being initiated. This paper will present key issues associated with megawatt NEP, and the plans and status for their resolution, and present the scope and rationale for the 100 kilowatt concept definition activity.

  14. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  15. Technical Excellence: A Requirement for Good Engineering

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2008-01-01

    Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.

  16. Low Activity Waste Pretreatment System Bench-Scale Testing: Supporting Integrated Testing and Facility Safety Analyses - 17171

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schonewill, Philip P.; Russell, Renee L.; Daniel, Richard C.

    The Low Activity Waste Pretreatment System (LAWPS) is being designed to enable the direct feed of waste to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to be immobilized. Prior to construction of the LAWPS, pilot-scale integrated testing of the key unit operations (crossflow filtration, ion exchange using spherical resorcinol-formaldehyde (sRF) resin) will be conducted by a team led by Washington River Protection Solutions (WRPS) to increase the technology maturation level of the facility’s critical technology elements. As a part of this effort, Pacific Northwest National Laboratory (PNNL) has conducted a series of bench-scalemore » (or engineering-scale) tests to perform two major objectives: (1) support pilot-scale integrated testing of the LAWPS by supplying information or performance data in advance of operating the pilot-scale facility; and (2) collect data needed to establish or confirm assumptions/approaches planned for implementation in the LAWPS safety basis. The first objective was focused in two technical areas: developing simulants that are representative of expected waste feed and can be produced at larger scales, and using these simulants in a bench-scale crossflow filter to establish expected solid-liquid separation performance. The crossflow filter was also used to observe the efficacy (with respect to filter production rate) of selected operational strategies. The second objective also included two technical areas: measuring the effect of sRF resin on hydrogen generation rate under irradiation, and demonstrating that the planned hydrogen management approach is effective and robust. The hydrogen management strategy involves fluidization of the sRF resin bed in the ion exchange columns and recirculating the liquid, a scenario that is planned for testing at full column height. The full height tests at PNNL also supported full-scale IX column testing conducted as part of the technology maturation plan. The experimental approaches used at PNNL in these four technical areas are summarized and selected key preliminary results are provided.« less

  17. A Planning Study for the Conversion of Recorded Books and Magazines from Rigid Discs to Cassettes and Flexible Discs. Final Report.

    ERIC Educational Resources Information Center

    Innovative Systems Research, Inc., Pennsauken, NJ.

    Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…

  18. Evaluating Learning and Teaching: Institutional Needs and Individual Practices

    ERIC Educational Resources Information Center

    Bamber, Veronica; Anderson, Sally

    2012-01-01

    Rather than a rational, technical activity, evaluation reflects the socio-political dynamics of the evaluative context. This presents a challenge for universities and the individuals within them, who may assume that plans or policies for evaluation will result in straightforward outcomes. This small-scale study in one institution looks at the…

  19. Thermal energy storage

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The planning and implementation of activities associated with lead center management role and the technical accomplishments pertaining to high temperature thermal energy storage subsystems are described. Major elements reported are: (1) program definition and assessment; (2) research and technology development; (3) industrial storage applications; (4) solar thermal power storage applications; and (5) building heating and cooling applications.

  20. Annual Evaluation of Vocational-Technical Education in American Samoa. 1975.

    ERIC Educational Resources Information Center

    American Samoa Advisory Council on Vocational Education, Pago Pago.

    Activities of the American Samoa Advisory Council on Vocational Education upon which the annual report is based include observations, participation in conferences and workshops on education and training, review of reports from educational and manpower agencies, results of special studies, and review of the State plan for vocational education. The…

  1. 78 FR 24394 - Agency Information Collection Activities; Comment Request; Carl D. Perkins Career and Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ...) State Plan Guide AGENCY: Office of Vocational and Adult Education (OVAE), Department of Education (ED... et seq.), ED is proposing an extension of an existing information collection. DATES: Interested... interested in public comment addressing the following issues: (1) Is this collection necessary to the proper...

  2. 78 FR 39715 - Agency Information Collection Activities; Comment Request; Carl D. Perkins Career and Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ...) State Plan Guide AGENCY: Office of Vocational and Adult Education (OVAE), Department of Education (ED... et seq.), ED is proposing an extension of an existing information collection. DATES: Interested... interested in public comment addressing the following issues: (1) Is this collection necessary to the proper...

  3. Arizona Research Coordinating Unit, Second Annual Report.

    ERIC Educational Resources Information Center

    Lee, Arthur M.

    The Arizona Research Coordinating Unit has concentrated its efforts during the past 18 months on a study of engineering technology which was published in March of 1968. A second major project is a study of vocational-technical education in the state to be used as a basis for future planning. Other activities included assistance with several…

  4. The astronaut and the banana peel: An EVA retriever scenario

    NASA Technical Reports Server (NTRS)

    Shapiro, Daniel G.

    1989-01-01

    To prepare for the problem of accidents in Space Station activities, the Extravehicular Activity Retriever (EVAR) robot is being constructed, whose purpose is to retrieve astronauts and tools that float free of the Space Station. Advanced Decision Systems is at the beginning of a project to develop research software capable of guiding EVAR through the retrieval process. This involves addressing problems in machine vision, dexterous manipulation, real time construction of programs via speech input, and reactive execution of plans despite the mishaps and unexpected conditions that arise in uncontrolled domains. The problem analysis phase of this work is presented. An EVAR scenario is used to elucidate major domain and technical problems. An overview of the technical approach to prototyping an EVAR system is also presented.

  5. Technical Evaluation Motor No. 7 (TEM-07)

    NASA Technical Reports Server (NTRS)

    Hugh, Phil

    1991-01-01

    Technical Evaluation Motor Number 7 (TEM-7) was a full scale, full-duration static test firing of a high performance motor (HPM) configuration solid rocket motor (SRM) with nozzle vectoring. The static test fire occurred on 11 December 1990 at the Thiokol Corporation Static Test Bay T-97. Documented here are the procedures, performance, and results available through 22 January 1991. Critical post test hardware activities and assessment of the test data are not complete. A completed test report will be submitted 60 days after the test date. Included here is a presentation and discussion of the TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107 Revision A, Space Shuttle Technical Evaluation Motor number 7 (TEM-07) Static Fire Test Plan.

  6. ACT Plan: Technical Manual. 2013/2014

    ERIC Educational Resources Information Center

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  7. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  8. INDOT Technical Training Plan : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  9. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    NASA Astrophysics Data System (ADS)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  10. TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals

    EPA Pesticide Factsheets

    TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals -- Brominated Phthalates Cluster Flame Retardants.

  11. Planning a DSN support section technical library

    NASA Technical Reports Server (NTRS)

    Bailey, T.; Chatburn, C. C.

    1980-01-01

    The planning procedure being used to establish a technical library for the Deep Space Network support section is described. The inventory and survey methods employed are described and the preliminary results of these methods are discussed.

  12. Navigation: National Plans; NAVSTAR-GPS; Laser Gyros

    DTIC Science & Technology

    1982-08-31

    REFERENC-~CP STER . TECHNICAL REPORT ! "NO. 12686,-’-. - NAVIGATION: NATIONAL PLANS ; NAVSTAR-GPS; LASER GYROS CONTRACT NO. DAAK30-80-C-0073 31 AUGUST...Technical ReportAW Ng. riiNational Plans ; Navstar-GPS; S... : NavstarGPS; a3 Sept 1980 - 31 Aug 1982 ....Lasr Gyros. 6. PERFORMING ORG. REPORT NUMBER PRA...identify by block number) Navigation Navigation Satellites Laser Gyros Position-Location . NAVSTAR-GPS Fiberoptic Gyros Planning Global Positioning System

  13. Supplement to a Methodology for Succession Planning for Technical Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Agreda, Carla L.

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.

  14. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    ERIC Educational Resources Information Center

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  15. The Birth of a New Vocational-Technical Center. National Vocational-Technical Facility Planning Conference (Las Vegas, Nevada, May, 1967).

    ERIC Educational Resources Information Center

    Farnsworth, Clayton

    The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…

  16. Ten rules for asset protection planning.

    PubMed

    Adkisson, Jay D; Keller, Lawrence B

    2013-12-01

    Asset protection planning is a highly technical area of legal planning. Because of the fraudulent transfer laws, asset protection planning must be done in advance of any claim, be technically sound, not rely upon secrecy, and avoid any number of critical mistakes including keeping personal and business assets separate. Physicians who engage in asset protection planning must avoid critical mistakes, and not count on bankruptcy to provide relief from creditors. General rules and cautions for those who are considering the creation of an asset protection plan for their personal assets.

  17. Technosocial Modeling of IED Threat Scenarios and Attacks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whitney, Paul D.; Brothers, Alan J.; Coles, Garill A.

    2009-03-23

    This paper describes an approach for integrating sociological and technical models to develop more complete threat assessment. Current approaches to analyzing and addressing threats tend to focus on the technical factors. This paper addresses development of predictive models that encompass behavioral as well as these technical factors. Using improvised explosive device (IED) attacks as motivation, this model supports identification of intervention activities 'left of boom' as well as prioritizing attack modalities. We show how Bayes nets integrate social factors associated with IED attacks into general threat model containing technical and organizational steps from planning through obtaining the IED to initiationmore » of the attack. The social models are computationally-based representations of relevant social science literature that describes human decision making and physical factors. When combined with technical models, the resulting model provides improved knowledge integration into threat assessment for monitoring. This paper discusses the construction of IED threat scenarios, integration of diverse factors into an analytical framework for threat assessment, indicator identification for future threats, and future research directions.« less

  18. International Space Station ECLSS Technical Task Agreement Summary Report

    NASA Technical Reports Server (NTRS)

    Ray, C. D. (Compiler); Salyer, B. H. (Compiler)

    1999-01-01

    This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauro, R.; Leach, S.

    This paper summarizes current and planned activities in the areas of hydrogen production and use, near-term venture opportunities, and codes and standards. The rationale for these efforts is to assess industry interest and engage in activities that move hydrogen technologies down the path to commercialization. Some of the work presented in this document is a condensed, preliminary version of reports being prepared under the DOE/NREL contract. In addition, the NHA work funded by Westinghouse Savannah River Corporation (WSRC) to explore the opportunities and industry interest in a Hydrogen Research Center is briefly described. Finally, the planned support of and industrymore » input to the Hydrogen Technical Advisory Panel (HTAP) on hydrogen demonstration projects is discussed.« less

  20. Software verification plan for GCS. [guidance and control software

    NASA Technical Reports Server (NTRS)

    Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.

    1990-01-01

    This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

  1. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  2. Life sciences payloads analyses and technical program planning studies. [project planning of space missions of space shuttles in aerospace medicine and space biology

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.

  3. Quality-assurance plan and field methods for quality-of-water activities, U.S. Geological Survey, Idaho National Engineering Laboratory, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, L.J.

    1996-10-01

    Water-quality activities at the Idaho National Engineering Laboratory (INEL) Project Office are part of the US Geological Survey`s (USGS) Water Resources Division (WRD) mission of appraising the quantity and quality of the Nation`s water resources. The purpose of the Quality Assurance Plan (QAP) for water-quality activities performed by the INEL Project Office is to maintain and improve the quality of technical products, and to provide a formal standardization, documentation, and review of the activities that lead to these products. The principles of this plan are as follows: (1) water-quality programs will be planned in a competent manner and activities willmore » be monitored for compliance with stated objectives and approaches; (2) field, laboratory, and office activities will be performed in a conscientious and professional manner in accordance with specified WRD practices and procedures by qualified and experienced employees who are well trained and supervised, if or when, WRD practices and procedures are inadequate, data will be collected in a manner that its quality will be documented; (3) all water-quality activities will be reviewed for completeness, reliability, credibility, and conformance to specified standards and guidelines; (4) a record of actions will be kept to document the activity and the assigned responsibility; (5) remedial action will be taken to correct activities that are deficient.« less

  4. Environmentally Responsible Aviation (ERA) Project - N+2 Advanced Vehicle Concepts Study and Conceptual Design of Subscale Test Vehicle (STV) Final Report

    NASA Technical Reports Server (NTRS)

    Bonet, John T.; Schellenger, Harvey G.; Rawdon, Blaine K.; Elmer, Kevin R.; Wakayama, Sean R.; Brown, Derrell L.; Guo, Yueping

    2011-01-01

    NASA has set demanding goals for technology developments to meet national needs to improve fuel efficiency concurrent with improving the environment to enable air transportation growth. A figure shows NASA's subsonic transport system metrics. The results of Boeing ERA N+2 Advanced Vehicle Concept Study show that the Blended Wing Body (BWB) vehicle, with ultra high bypass propulsion systems have the potential to meet the combined NASA ERA N+2 goals. This study had 3 main activities. 1) The development of an advanced vehicle concepts that can meet the NASA system level metrics. 2) Identification of key enabling technologies and the development of technology roadmaps and maturation plans. 3) The development of a subscale test vehicle that can demonstrate and mature the key enabling technologies needed to meet the NASA system level metrics. Technology maturation plans are presented and include key performance parameters and technical performance measures. The plans describe the risks that will be reduced with technology development and the expected progression of technical maturity.

  5. Battery and Fuel Cell Development Goals for the Lunar Surface and Lander

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.

    2008-01-01

    NASA is planning a return to the moon and requires advances in energy storage technology for its planned lunar lander and lunar outpost. This presentation describes NASA s overall mission goals and technical goals for batteries and fuel cells to support the mission. Goals are given for secondary batteries for the lander s ascent stage and suits for extravehicular activity on the lunar surface, and for fuel cells for the lander s descent stage and regenerative fuel cells for outpost power. An overall approach to meeting these goals is also presented.

  6. 32 CFR 37.420 - Should I tell proposers that we will not disclose information that they submit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure...

  7. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ...: These technical amendments are effective on March 21, 2012. FOR FURTHER INFORMATION CONTACT: Doris Lo, EPA Region IX, (415) 972- 3959, lo[email protected] . SUPPLEMENTARY INFORMATION: Technical Amendment for...

  8. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  9. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  10. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  11. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  12. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  13. Technical-Information Products for a National Volcano Early Warning System

    USGS Publications Warehouse

    Guffanti, Marianne; Brantley, Steven R.; Cervelli, Peter F.; Nye, Christopher J.; Serafino, George N.; Siebert, Lee; Venezky, Dina Y.; Wald, Lisa

    2007-01-01

    Introduction Technical outreach - distinct from general-interest and K-12 educational outreach - for volcanic hazards is aimed at providing usable scientific information about potential or ongoing volcanic activity to public officials, businesses, and individuals in support of their response, preparedness, and mitigation efforts. Within the context of a National Volcano Early Warning System (NVEWS) (Ewert et al., 2005), technical outreach is a critical process, transferring the benefits of enhanced monitoring and hazards research to key constituents who have to initiate actions or make policy decisions to lessen the hazardous impact of volcanic activity. This report discusses recommendations of the Technical-Information Products Working Group convened in 2006 as part of the NVEWS planning process. The basic charge to the Working Group was to identify a web-based, volcanological 'product line' for NVEWS to meet the specific hazard-information needs of technical users. Members of the Working Group were: *Marianne Guffanti (Chair), USGS, Reston VA *Steve Brantley, USGS, Hawaiian Volcano Observatory HI *Peter Cervelli, USGS, Alaska Volcano Observatory, Anchorage AK *Chris Nye, Division of Geological and Geophysical Surveys and Alaska Volcano Observatory, Fairbanks AK *George Serafino, National Oceanic and Atmospheric Administration, Camp Springs MD *Lee Siebert, Smithsonian Institution, Washington DC *Dina Venezky, USGS, Volcano Hazards Team, Menlo Park CA *Lisa Wald, USGS, Earthquake Hazards Program, Golden CO

  14. Heterogeneous IP Ecosystem enabling Reuse (HIER)

    DTIC Science & Technology

    2017-03-22

    Technical Approach and Justification IP reuse is a cornerstone of the commercial electronics market particularly in the digital domain...even in the digital domain. Significant investments in custom ASIC designs have been made by the government, but the IP resulting from such... approach to address requirements for that program. Research Plan The original vision for the HIER activity involved the evaluation

  15. Cyber Intelligence Research Consortium (Poster)

    DTIC Science & Technology

    2014-10-24

    OCT 2014 2. REPORT TYPE N/A 3. DATES COVERED 4. TITLE AND SUBTITLE Cyber Intelligence Research Consortium Poster 5a. CONTRACT NUMBER 5b...nontechnical audiences Environmental Context Provides scope for the analytical effort • Highlights the importance of context - technical and nontechnical... Environmental Context Reporting & Feedback Macroanalysis Microanalysis Data Gathering Steering Committee: Guide Consortium activities and plan for future

  16. 78 FR 19017 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Annual...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... (FAB) 2013-01 concerning the new disclosure requirements mandated the MAP-21. The FAB addresses a need...), as amended by the MAP-21. The FAB sets forth technical questions and answers and provides a model... the FAB is necessary for plan administrators to satisfy the annual funding notice requirements. The...

  17. Seeking Direction for Vocational and Technical Education in the 1990s. Report of Fiscal Years 1986-88.

    ERIC Educational Resources Information Center

    Sheppard Pratt National Center for Human Development, Baltimore, MD.

    In its first three sections, this report lists members of the Montana Council on Vocational Education, describes the council structure, identifies its purpose, and outlines its duties and responsibilities. Section 4 describes the activities of three standing committees: policy and planning; evaluation and employment; and coordination and…

  18. History of the Italian San Marco equatorial mobile range

    NASA Technical Reports Server (NTRS)

    Nesbitt, H. N.

    1971-01-01

    Events leading to the development of the San Marco Equatorial Range are presented. Included are background information leading to the cooperative space program between the United States and Italy, conceptual planning, training activities, equipment design and fabrication, and range utilization. The technical support provided the San Marco Program by Scout Project Office, and other NASA installations is described.

  19. 75 FR 19677 - Medicare Program; Policy and Technical Changes to the Medicare Advantage and the Medicare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...

  20. Long-Range Plan for Gateway Technical Institute. 1982-1987: Serving Kenosha, Racine, and Walworth Counties.

    ERIC Educational Resources Information Center

    Stoehr, Keith W.; Covelli, Nicholas J.

    This report presents Gateway Technical Institute's long-range plan for 1982-1987. After prefatory material discussing financial and non-financial factors that may impinge on the plan, Chapter I outlines the socioeconomic situation in the three-county area of Wisconsin served by the college and introduces some of the critical issues that the…

  1. Performance measurement: A tool for program control

    NASA Technical Reports Server (NTRS)

    Abell, Nancy

    1994-01-01

    Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

  2. Housing, health and master planning: rules of engagement.

    PubMed

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  3. 10 CFR 603.420 - Disclosure of information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... types that are exempt: (i) Proposals, proposal abstracts, and supporting documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure requirements, they must mark...

  4. Transportation Network Data Requirements for Assessing Criticality for Resiliency and Adaptation Planning

    DOT National Transportation Integrated Search

    2017-11-01

    This report is one of two NCST Research Report documents produced as part of a project to advance the technical modeling tools for resiliency and adaptation planning, especially those used for criticality rankings. The official final technical report...

  5. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  6. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  7. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  8. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  9. Integrated corridor management initiative : demonstration phase evaluation – Dallas technical capability analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  10. WHO influenza vaccine technology transfer initiative: role and activities of the Technical Advisory Group.

    PubMed

    Francis, Donald P; Grohmann, Gary

    2011-07-01

    In May 2006, the WHO published a Global Pandemic Influenza Action Plan. A significant part of that plan involves the transfer of technology necessary to build production capacity in developing countries. The WHO influenza technology transfer initiative has been successful. Clearly the relatively small WHO investments made in these companies to develop their own influenza vaccine production facilities have had quite dramatic results. A few companies are already producing large amounts of influenza vaccine. Others will soon follow. Whether they are developing egg-based or planning non-egg based influenza vaccine production, all companies are optimistic that their efforts will come to fruition. Copyright © 2011 Elsevier Ltd. All rights reserved.

  11. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  12. Environmental restoration and waste management five year plan, fiscal years 1994--1998. Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  13. Annual Report of the Metals and Ceramics Information Center, 1 May 1979-30 April 1980.

    DTIC Science & Technology

    1980-07-01

    MANAGEMENT AND ECONOMIC ANALYSIS DEPT. * Computer and Information SyslemsiD. C Operations 1 Battelle Technical Inputs to Planning * Computer Systems 0...Biomass Resources * Education 0 Business Planning * Information Systems * Economics , Planning and Policy Analysis * Statistical and Mathematical Modelrng...Metals and Ceramics Information Center (MCIC) is one of several technical information analysis centers (IAC’s) chartered and sponsored by the

  14. Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).

    ERIC Educational Resources Information Center

    Texas State Board of Education, Austin.

    In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…

  15. 2013 Technical Roundtable

    EPA Pesticide Factsheets

    On December 9, 2013, EPA reconvened the study’s Technical Roundtable. Subject-matter experts discussed the outcomes of the 2013 Technical Workshops, stakeholder engagement, and plans for draft assessment report.

  16. Does service integration improve technical quality of care in low-resource settings? An evaluation of a model integrating HIV care into family planning services in Kenya

    PubMed Central

    Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline

    2017-01-01

    Abstract The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client–provider consultation sessions. The cross-sectional study observed 366 client–provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63–0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07–14.21), adequate infrastructure (5.29; 95% CI: 2.89–7.69) and reagents (1.48; 95% CI: 1.02–1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92–4.36), job satisfaction (2.02; 95% CI: 1.21–2.83) and supervision (1.01; 95% CI: 0.35–1.68), while workload (−0.88; 95% CI: −1.75 to − 0.01) was negatively associated. Technical quality of the client–provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client–provider consultation sessions as measured by both health facility structural and provider factors. PMID:29194543

  17. Does service integration improve technical quality of care in low-resource settings? An evaluation of a model integrating HIV care into family planning services in Kenya.

    PubMed

    Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline

    2017-11-01

    The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client-provider consultation sessions. The cross-sectional study observed 366 client-provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63-0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07-14.21), adequate infrastructure (5.29; 95% CI: 2.89-7.69) and reagents (1.48; 95% CI: 1.02-1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92-4.36), job satisfaction (2.02; 95% CI: 1.21-2.83) and supervision (1.01; 95% CI: 0.35-1.68), while workload (-0.88; 95% CI: -1.75 to - 0.01) was negatively associated. Technical quality of the client-provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client-provider consultation sessions as measured by both health facility structural and provider factors. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.

  18. Low Impact Development Master Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loftin, Samuel R.

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  19. Structural dynamics division research and technology accomplishments for FY 1993 and plans for FY 1994

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1994-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  20. Structural dynamics division research and technology accomplishments for FY 1989 and plans for FY 1990

    NASA Technical Reports Server (NTRS)

    Smith, Jacqueline G.; Gardner, James E.

    1990-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  1. Loads and aeroelasticity division research and technology accomplishments for FY 1985 and plans for FY 1986

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1986-01-01

    The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  2. Loads and Aeroelasticity Division research and technology accomplishments for FY 1986 and plans for FY 1987

    NASA Technical Reports Server (NTRS)

    Gardner, James E.; Dixon, S. C.

    1987-01-01

    The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  3. Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

  4. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  5. Staff Considerations in Technical Services: The Chameleon Approach.

    ERIC Educational Resources Information Center

    Foster, Constance L.

    1988-01-01

    Discusses the need to cope effectively with technological transitions in library technical services and to plan for successful staff development. The areas discussed include changing job skills, financial planning, ergonomics, innovative partnerships, training, and an emphasis on human resources development. (21 references) (Author/CLB)

  6. 7 CFR 1468.9 - Conservation farm plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Prior to contract approval, a conservation farm plan must be written and approved. In deciding whether... applicable NRCS field office technical guide or as approved by the State Conservationist. (e) Participants... participant's request, the NRCS may provide technical assistance to a participant. (1) Participants may, at...

  7. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  8. [In search of results of technical cooperation].

    PubMed

    Jourdan Hidalgo, L; Manuel Sotelo, J

    1999-06-01

    For the Pan American Health Organization (PAHO), technical cooperation (TC) is the process by which the PAHO Member States work with the Organization, as equal partners, to identify and reach their own health goals and to promote self-sufficiency in health development, through programs that respond to those countries' needs and national priorities. Since 1978, PAHO has used the American Regional Planning, Programming, Monitoring, and Evaluation System (AMPES) to establish management procedures and to facilitate decision-making in health TC. As part of AMPES, PAHO uses a "logical approach to project management" to structure the work program of the Organization and to identify the expected results from TC activities and TC resource investments. This project management approach, which replaces the "functional approaches" system used to date, also helps establish a causative relationship between the programmed activities and the results that PAHO expects, and between the activities and the hoped-for outcomes in the countries. As part of an ongoing process of rethinking international health TC, several years ago PAHO began a four-phase study on the usefulness and validity of functional approaches and on the need to propose new ones or to modify existing ones. The results of the initial phase showed it was difficult to classify the activities because the functional-approaches categories were not mutually exclusive and the TC activities were complex. Further, the expected results did not specify the product for which the PAHO Secretariat was accountable within a certain time frame nor the Secretariat's level of responsibility. Thus, a new and more flexible classification of expected results was proposed, with the following categories: cooperation networks and alliances; surveillance and information systems; standards and guidelines; research and evaluation studies; plans, projects, and policies; methods, models, and technologies; training programs; promotional campaigns and advocacy; and direct support. In the second phase of the study, it was concluded that the proposed classification system made it possible to more precisely identify the products of PAHO technical cooperation projects, the Organization's degree of responsibility, and the bases for estimating needed resources. The new system could also facilitate monitoring and evaluation. In addition, the third phase of analyzing the functional approaches has begun. Its objective is to evaluate the effect of technical cooperation based on the changes incorporated in the programming of activities.

  9. Field Test of the Methodology for Succession Planning for Technical Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cain, Ronald A.; Kirk, Bernadette Lugue; Agreda, Carla L.

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, hereafter referred to as “core competencies”. The methodology has been field tested by interviewing selected retiring subject matter experts (SMEs).

  10. Software And Systems Engineering Risk Management

    DTIC Science & Technology

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  11. JPRS Report, East Europe

    DTIC Science & Technology

    1987-11-16

    technologi- cal engineering, and design in the subordinate units and takes steps to pro- vide them with necessary technical-material resources; b) It... methodologies and the uniform standards and norms for the branch, subbranches, and other activities, and oversees their manner of application; it...dual subordination, in the field of preparing and fulfilling the annual plans for research, design , and microproduction; f) It participates in the

  12. Coordinating Council. Second Meeting: International Acquisitions

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The theme of this NASA Scientific and Technical Information Program Coordinating Council was International Acquisitions. Included are both visuals for presentations and reports on discussions related to the topics. Presentations were made on the following topics: Coordination council organization international plan, STI global network, International aerospace climate, Foreign exchange program, Foreign activities RMS & AIAA, NASA translation program, A.F. machine translation system, and CIRC cooperation.

  13. DCERP Annual Technical Report II

    DTIC Science & Technology

    2009-05-01

    information among the various DCERP partners . Research and monitoring activities during Phase II of DCERP are currently planned for 4 years (until...this information to improve scheduling of amphibious maneuvers in the NRE. Preliminary analysis of MCBCL air quality data indicated an increasing...2008 at the three MCBCL sites exceeded current National Ambient Air Quality Standards. Experimental results show that salt marshes bordering the

  14. The Extreme Ultraviolet Explorer science instruments development - Lessons learned

    NASA Technical Reports Server (NTRS)

    Malina, Roger F.; Battel, S.

    1991-01-01

    The science instruments development project for the Extreme Ultraviolet Explorer (EUVE) satellite is reviewed. Issues discussed include the philosophical basis of the program, the establishment of a tight development team, the approach to planning and phasing activities, the handling of the most difficult technical problems, and the assessment of the work done during the preimplemntation period of the project.

  15. Cerulean Warbler Technical Group: Coordinating international research and conservation

    USGS Publications Warehouse

    Dawson, D.K.; Wigley, T.B.; Keyser, P.D.

    2012-01-01

    Effective conservation for species of concern requires interchange and collaboration among conservationists and stakeholders. The Cerulean Warbler Technical Group (CWTG) is a consortium of biologists and managers from government agencies, non-governmental organizations, academia, and industry, who are dedicated to finding pro-active, science-based solutions for conservation of the Cerulean Warbler (Setophaga cerulea). Formed in the United States in 2001, CWTG’s scope soon broadened to address the species’ ecology and conservation on both the breeding and non-breeding ranges, in partnership with biologists from South and Central America. In 2004, CWTG launched the Cerulean Warbler Conservation Initiative, a set of activities aimed at addressing information and conservation needs for the species. These include (1) studies in the core breeding range to assess Cerulean Warbler response to forest management practices and to identify mined lands that could be reforested to benefit the species, (2) ecological and demographic studies on the winter range, and (3) surveys of Cerulean Warbler distribution on the breeding and winter ranges and during migration. A rangewide conservation action plan has been completed, along with a more detailed conservation plan for the non-breeding range. CWTG and partners now move forward with on-the-ground conservation, while still addressing unmet information needs.

  16. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  17. Vision for the Year 2002: A Working Document. Salem County Board for Vocational Education Strategic Plan for the Salem County Vocational Technical Schools.

    ERIC Educational Resources Information Center

    Salem County Board for Vocational Education, Woodstown, NJ.

    A strategic plan for vocational-technical education (VTE) in Salem County, New Jersey, in the year 2002 was developed by the county board of VTE and county advisory board with input from students, parents, employers, elected officials, and the community in general. Six strategic planning subcommittees were formed to review the district's VTE…

  18. Developing cancer control capacity in state and local public health agencies.

    PubMed

    Meissner, H I; Bergner, L; Marconi, K M

    1992-01-01

    In 1986, the National Cancer Institute began a major grant program to enhance the technical capabilities of public health departments in cancer prevention and control. This effort, commonly referred to as "capacity building" for cancer control, provided funding to support eight State and one local health department. The program focused on developing the knowledge and skills of health department personnel to implement intervention programs in such areas as smoking cessation, diet modification, and breast and cervical cancer screening. The grants ranged from 2 to 5 years in length, with funding of $125,000 to $1.6 million per grant. The total for the program was $7.4 million. While the priorities set for these grants were nominally similar, their capacity building activities in cancer prevention and control evolved into unique interventions reflecting the individual needs and priorities of each State or locality. Their experiences illustrate that technical development for planning, implementing, and evaluating cancer prevention and control programs is a complex process that must occur at multiple levels, regardless of overall approach. Factors found to contribute to successful implementation of technical development programs include* commitment of the organization's leadership to provide adequate support for staff and activities and to keep cancer prevention and control on the organizational agenda,* the existence of appropriate data to monitor and evaluate programs,* appropriately trained staff,* building linkages with State and community agencies and coalitions to guide community action,* an established plan or process for achieving cancer control objectives,* access to the advice of and participation of individual cancer and health experts,* an informed State legislature,* diffusion of cancer prevention and control efforts,and* the ability to obtain funds needed for future activities.

  19. Engineered Barrier System: Physical and Chemical Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P. Dixon

    2004-04-26

    The conceptual and predictive models documented in this Engineered Barrier System: Physical and Chemical Environment Model report describe the evolution of the physical and chemical conditions within the waste emplacement drifts of the repository. The modeling approaches and model output data will be used in the total system performance assessment (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. These models evaluate the range of potential water compositions within the emplacement drifts, resulting from the interaction of introduced materials and minerals in dust with water seeping into the drifts and with aqueous solutions forming bymore » deliquescence of dust (as influenced by atmospheric conditions), and from thermal-hydrological-chemical (THC) processes in the drift. These models also consider the uncertainty and variability in water chemistry inside the drift and the compositions of introduced materials within the drift. This report develops and documents a set of process- and abstraction-level models that constitute the engineered barrier system: physical and chemical environment model. Where possible, these models use information directly from other process model reports as input, which promotes integration among process models used for total system performance assessment. Specific tasks and activities of modeling the physical and chemical environment are included in the technical work plan ''Technical Work Plan for: In-Drift Geochemistry Modeling'' (BSC 2004 [DIRS 166519]). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system analysis model reports.« less

  20. Alternative sample sizes for verification dose experiments and dose audits

    NASA Astrophysics Data System (ADS)

    Taylor, W. A.; Hansen, J. M.

    1999-01-01

    ISO 11137 (1995), "Sterilization of Health Care Products—Requirements for Validation and Routine Control—Radiation Sterilization", provides sampling plans for performing initial verification dose experiments and quarterly dose audits. Alternative sampling plans are presented which provide equivalent protection. These sampling plans can significantly reduce the cost of testing. These alternative sampling plans have been included in a draft ISO Technical Report (type 2). This paper examines the rational behind the proposed alternative sampling plans. The protection provided by the current verification and audit sampling plans is first examined. Then methods for identifying equivalent plans are highlighted. Finally, methods for comparing the cost associated with the different plans are provided. This paper includes additional guidance for selecting between the original and alternative sampling plans not included in the technical report.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benioff, R.; Ness, E.; Hirst, J.

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less

  2. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  3. Succession Planning for Management Staff at a Western Canadian Postsecondary Technical Institute.

    ERIC Educational Resources Information Center

    Cembrowski, Barbara Joan; da Costa, Jose L.

    This study used naturalistic inquiry to gain an understanding of how managerial personnel perceived career development and succession planning at a postsecondary technical institute in Canada. A total of nine individuals in three different career development stages completed semistructured interviews. It was found that managers perceived the…

  4. Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.

    ERIC Educational Resources Information Center

    da Costa, Jose; Cembrowski, Barbara

    2001-01-01

    Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…

  5. Chattanooga State Technical Community College Marketing Plan 1981-82.

    ERIC Educational Resources Information Center

    Hoppe, Sherry; Haddock, David

    Chattanooga State Technical Community College's (CSTCC's) marketing plan is presented in six parallel sections. The first of these deals with building the overall image of the college, increasing community awareness, and disseminating general information. The other five sections focus on marketing the following college programs and services:…

  6. 77 FR 19280 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will...-time and day-ahead market efficiency through improved software. A detailed agenda with the list of and...

  7. A Technical Evaluation of the First Stage of the Mediterranean Regional Project.

    ERIC Educational Resources Information Center

    Hollister, Robinson

    Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…

  8. 76 FR 28022 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will... for increasing real-time and day-ahead market efficiency through improved software. This conference...

  9. Development of Cooperative Planning for Technical-Vocational Programs.

    ERIC Educational Resources Information Center

    Cisco Junior Coll., TX.

    During the past decade vocational-technical education in Texas has grown so rapidly that now attention must be given to enrollments, employment projections, and more efficient utilization of the limited resources available. Cisco and Ranger Junior Colleges serve essentially the same population and a plan for close cooperation and coordination is…

  10. 40 CFR 52.460 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source... PLANS Delaware § 52.460 Small business stationary source technical and environmental compliance... Environmental Control submitted a plan for the establishment and implementation of a Small Business Stationary...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first ofmore » a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning supplementation projects (11) application of the spreadsheet model to supplementation planning; and (12) experimental design and decision making with uncertainty.« less

  12. Structural dynamics division research and technology accomplishments for FY 1992 and plans for FY 1993

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1993-01-01

    The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  13. Loads and aeroelasticity division research and technology accomplishments for FY 1987 and plans for FY 1988

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Gardner, James E.

    1988-01-01

    The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  14. Engineering and Industrial Fields. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in engineering and industrial fields. A…

  15. Agriculture and Related Businesses. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in agriculture and related businesses. A…

  16. Health Related Occupations. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in health related occupations. A three-phase…

  17. Securing the High Ground: Dominant Combat Air Force for America. 2008 Combat Air Force Strategic Plan

    DTIC Science & Technology

    2008-07-28

    continue to be beyond our technical ability to realize aggresively pursue advanced technical solutions to stay at the leading edge of technological...inherent to each caf Way and to seek continual improvement through exploration of innovative concepts, advanced capabilities, game -changing...available online at the air force portal: https://wwwd.my.af.mil/afknprod/strat_plan COMBAT AIR FORCE STRATEGIC PLAN Points of Contact securing the high

  18. Loads and Aeroelasticity Division research and technology accomplishments for FY 1984 and plans for FY 1985

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1985-01-01

    The loads and aeroelasticity divisions research accomplishments are presented. The work under each branch or technical area, described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  19. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  20. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  1. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  2. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  3. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  4. Promoting family planning through women's development.

    PubMed

    Gulhati, K

    1986-12-01

    Private initiatives in developing countries have been successful in increasing women's desire for family planning by enabling them to earn more income. These approaches have incorporated a woman-to-woman strategy in which women train others not only in how to earn an income from producing and marketing products, but also in the skills needed to establish and manage their own organizations. Private voluntary organizations play an especially crucial role in training project managers. The Center for Development and Population Activities, for example, has held 19 Women in Management workshops and channels funds and technical assistance for projects in health, family planning, nutrition, and income generation. Women who move from managerial to policymaking positions are most able to help other women raise their political, social, and economic status.

  5. 10 CFR 905.40 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Technical assistance. 905.40 Section 905.40 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Energy Services § 905.40 Technical assistance. Western shall establish a program that provides technical assistance to customers to conduct integrated...

  6. Does Satisfaction Reflect the Technical Quality of Mental Health Care?

    PubMed Central

    Edlund, Mark J; Young, Alexander S; Kung, Fuan Yue; Sherbourne, Cathy D; Wells, Kenneth B

    2003-01-01

    Objective To analyze the relationship between satisfaction and technical quality of care for common mental disorders. Data Source A nationally representative telephone survey of 9,585 individuals conducted in 1997–1998. Study Design Using multinomial logistic regression techniques we investigated the association between a five-level measure of satisfaction with the mental health care available for personal or emotional problems and two quality indicators. The first measure, appropriate technical quality, was defined as use of either appropriate counseling or psychotropic medications during the prior year for a probable depressive or anxiety disorder. The second, active treatment, indicated whether the respondent had received treatment for a psychiatric disorder in the past year. Covariates included measures of physical and mental health and sociodemographic indicators. Principal Findings Appropriate technical quality of care was significantly associated with higher levels of satisfaction. The strength of the association was moderate. Conclusions Satisfaction is associated with technical quality of care. However, profiling quality of care with satisfaction will likely require large samples and case-mix adjustment, which may be more difficult for plans or provider groups to implement than measuring technical indicators. More importantly, satisfaction is not the same as technical quality, and our results suggest that at this time they cannot be made to approach each other closely enough to eliminate either. PMID:12785565

  7. Methane Hydrate Field Program: Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, Greg

    This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Projectmore » Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.« less

  8. Planning building energy conservation research in the US

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abel, F.; LaMontagne, J.

    1988-01-01

    In the US, the federal government plays a key role in the development of energy conserving technologies and practices for buildings. The Office of Buildings and Community Systems (BCS) of the US Department of Energy provides federal leadership for both private and public sector activities in building energy conservation. The federal role in recent years has been largely limited to the development of technical options; behavioral and institutional factors are considered only to the extent necessary to inform the research planning process. Planning in the US requires dealing with uncertainties regarding the federal approach to energy conservation; this can change,more » often dramatically, with changes in administrations or changing economic and energy conditions. Thus federal research plans must be designed to be useful in a wide variety of circumstances. 7 refs.« less

  9. Outlook for outdoor recreation in the northern United States. A technical document supporting the Northern Forest Futures Project with projections through 2060

    Treesearch

    J.M. Bowker; Ashley E. Askew

    2013-01-01

    We develop projections of participation and use for 17 nature-based outdoor recreation activities through 2060 for the Northern United States. Similar to the 2010 Resources Planning Act (RPA) assessment, this report develops recreation projections under futures wherein population growth, socioeconomic conditions, land use changes, and climate are allowed to change over...

  10. Active Reliability Engineering - Technical Concept and Program Plan. A Solid-State Systems Approach to Increased Reliability and Availability in Military Systems.

    DTIC Science & Technology

    1983-10-05

    battle damage. Others are local electrical power and cooling disruptions. Again, a highly critical function is lost if its computer site is destroyed. A...formalized design of the test bed to meet the requirements of the functional description and goals of the program. AMTEC --Z3IT TASKS: 610, 710, 810

  11. National Action Plan on Superconductivity Research and Development

    NASA Astrophysics Data System (ADS)

    1989-12-01

    The Superconductivity Action Plan pursuant to the Superconductivity and Competitiveness Act of 1988 is presented. The plan draws upon contributions from leaders in the technical community of the Federal Government responsible for research and development in superconductivity programs, as well as from the report of the Committee to Advise the President on Superconductivity. Input from leaders in the private sector was obtained during the formulation and review of the plan. Some contents: Coordination of the plan; Technical areas (high temperature superconductivity materials in general, high temperature superconductivity films for sensors and electronics, magnets, large area high temperature superconductivity films, bulk conductors); and Policy areas.

  12. Educational Reform and the World of Work: Italy

    ERIC Educational Resources Information Center

    von Blumenthal, Viktor

    1977-01-01

    One of a four-issue series on educational reform and the world of work in Europe, this issue discusses educational planning and secondary school reform in Italy. Topics discussed include planning and research in vocational-technical education, and the relation between acquisition of specific skills and scientific and technical progress. (Author/DB)

  13. Strategic Planning in a Government Organization: The Experience of the Technical Information Division at NRaD.

    ERIC Educational Resources Information Center

    Cathcart, Margaret E.

    1997-01-01

    Describes development of strategic objectives at the Research, Development, Test, and Evaluation Division of the Naval Command, Control and Ocean Surveillance Center (NRaD). Discusses its plan to achieve these objectives. States that the organization's responsibilities span the continuum of information using technical communication skills. Uses…

  14. A Strategic Plan for Texas State Technical Institute.

    ERIC Educational Resources Information Center

    Texas State Technical Inst., Waco.

    Following two decades of growth, both enrollment and funding at the Texas State Technical Institute (TSTI) have declined sharply over the last 5 years. In April 1989, the TSTI initiated a strategic planning process incorporating a strategy based on meeting a clearly recognized and understood public need that is within the role, scope, and mission…

  15. Nevada State Five-Year Plan: July 1, 2008 through June 30, 2013

    ERIC Educational Resources Information Center

    Nevada Department of Education, 2008

    2008-01-01

    With the recent enactment of the Carl D. Perkins Career and Technical Education Act of 2006, Congress has demonstrated overwhelming bipartisan support to continue the country's federal investment in career and technical education. This document, the "Nevada State Five-Year Plan for the Carl D. Perkins Act of 2006," referred hereinafter…

  16. Special Project for Research Training in Vocational Education: Research Training Series. Final Report.

    ERIC Educational Resources Information Center

    Vivian, Neal E.

    To upgrade research and research utilization competence of vocational educators, The Center for Vocational and Technical Education and The American Vocational Association planned four 1-week research training programs on: (1) Planning Vocational/Technical Education Programs Based on Manpower Research, (2) Patterns of Career Development as Applied…

  17. 78 FR 5310 - Relocation of and Spectrum Sharing by Federal Government Stations-Technical Panel and Dispute...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ...--The Wireless Association (CTIA); Comments of Ericsson, Inc. (Ericsson); Comments of Squire Sanders (US... promptly develop such plans, because OMB is not authorized to make any transfers from the Fund unless the... plans. See CTIA Comments at 7 (``Technical information such as transmitter power, receiver performance...

  18. A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  19. New Concepts in Vocational-Technical Programs and Planning.

    ERIC Educational Resources Information Center

    Mochon, Clint

    The latest principle behind designing and planning vocational-technical school is "built-in-pride", which must be motivated in both student and surrounding community. We are at last emerging from the dark tunnel of the "trade school", away from the cold institutional look, the clamor of shop classrooms, echoing corridors, and the invisible tattoo…

  20. "A Technical Assistance Report" on Computer Technology Applications. Smithville School District, Smithville, Massachusetts.

    ERIC Educational Resources Information Center

    Merrimack Education Center, Chelmsford, MA.

    This report of the Technical Assistance Study provided to the Smithville Public Schools by the Technology Lighthouse of the Merrimack Education Center offers information for use in planning computer technology applications over a 3-year period. It provides specific guidelines and criteria for planning and development, equipment considerations,…

  1. 75 FR 34734 - Improving Market and Planning Efficiency Through Improved Software; Notice of Agenda and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff Technical Conference June 10, 2010. This notice establishes the agenda and procedures for the staff[email protected] . Kimberly D. Bose, Secretary. Agenda for AD10-12 Staff Technical Conference on Enhanced Power...

  2. Improvements in State and Local Planning for Mass Dispensing of Medical Countermeasures: The Technical Assistance Review Program, United States, 2007-2014.

    PubMed

    Renard, Paul G; Vagi, Sara J; Reinold, Chris M; Silverman, Brenda L; Avchen, Rachel N

    2017-09-01

    To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention's Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success.

  3. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less

  4. Goal Reconstruction: How Teton Blends Situated Action and Planned Action

    DTIC Science & Technology

    1989-11-03

    DTIC FILE COPy 00 P 1n GOAL RECONSTRUCTION: HOW TETON BLENDS N SITUATED ACTION AND PLANNED ACTION Technical Report AIP 125 Kurt VanLehn William Ball...distribiikn unlimited. so 08 21 2 GOAL RECONSTRUCTION: HOW TETON BLENDS SITUATED ACTION AND PLANNED ACTION Technical Report AlP 125 Kurt VanLehn William Ball...Architectures for Intelligence. This is the final report on the research supported by the Computer Science Division, Office of Naval Research, under

  5. Savannah River Laboratory quality assurance manual. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-02-01

    The SRL quality assurance program is a management activity that verifies that the results of our research and development are adequate for their intended use and that our facilities function properly. The program is based on Savannah River Quality Assurance Plan (DPW-82-111-2, Rev 0) as applied through Quality Assurance Procedures and Divisional Plans (following section). The AED policy states that ''all activities shall be conducted to achieve a high quality of product and performance...'' The policy contains 18 considerations to be applied ''proportional to needs, based on the technical and professional judgment of responsible Du Pont employees.'' Quality is themore » responsibility of each individual and his line organization, as is safety. To ensure that quality is being considered for all SRL activities, all research programs are reviewed, and all facilities are assessed. These assessments and reviews are the nucleus of the Quality Assurance program.« less

  6. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chartock, Mike; Hansen, Todd

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategicmore » management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.« less

  7. [Plan to improve malaria control towards its elimination in Mesoamerica].

    PubMed

    Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco

    2011-01-01

    To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.

  8. The real world and lunar base activation scenarios

    NASA Technical Reports Server (NTRS)

    Schmitt, Harrison H.

    1992-01-01

    A lunar base or a network of lunar bases may have highly desirable support functions in a national or international program to explore and settle Mars. In addition, He-3 exported from the Moon could be the basis for providing much of the energy needs of humankind in the twenty-first century. Both technical and managerial issues must be addressed when considering the establishment of a lunar base that can serve the needs of human civilization in space. Many of the technical issues become evident in the consideration of hypothetical scenarios for the activation of a network of lunar bases. Specific and realistic assumptions must be made about the conduct of various types of activities in addition to the general assumptions given above. These activities include landings, crew consumables, power production, crew selection, risk management, habitation, science station placement, base planning, science, agriculture, resource evaluation, readaptation, plant activation and test, storage module landings, resource transport module landings, integrated operations, maintenance, Base 2 activation, and management. The development of scenarios for the activation of a lunar base or network of bases will require close attention to the 'real world' of space operations. That world is defined by the natural environment, available technology, realistic objectives, and common sense.

  9. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Provision of technical... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... technical assistance to the licensee. Such assistance may be provided during the pendency of an appeal under...

  10. Technical aspects of positron emission tomography/computed tomography in radiotherapy treatment planning.

    PubMed

    Scripes, Paola G; Yaparpalvi, Ravindra

    2012-09-01

    The usage of functional data in radiation therapy (RT) treatment planning (RTP) process is currently the focus of significant technical, scientific, and clinical development. Positron emission tomography (PET) using ((18)F) fluorodeoxyglucose is being increasingly used in RT planning in recent years. Fluorodeoxyglucose is the most commonly used radiotracer for diagnosis, staging, recurrent disease detection, and monitoring of tumor response to therapy (Lung Cancer 2012;76:344-349; Lung Cancer 2009;64:301-307; J Nucl Med 2008;49:532-540; J Nucl Med 2007;48:58S-67S). All the efforts to improve both PET and computed tomography (CT) image quality and, consequently, lesion detectability have a common objective to increase the accuracy in functional imaging and thus of coregistration into RT planning systems. In radiotherapy, improvement in target localization permits reduction of tumor margins, consequently reducing volume of normal tissue irradiated. Furthermore, smaller treated target volumes create the possibility of dose escalation, leading to increased chances of tumor cure and control. This article focuses on the technical aspects of PET/CT image acquisition, fusion, usage, and impact on the physics of RTP. The authors review the basic elements of RTP, modern radiation delivery, and the technical parameters of coregistration of PET/CT into RT computerized planning systems. Copyright © 2012 Elsevier Inc. All rights reserved.

  11. [Preventing maternal and child malnutrition: the nutrition component of the Mesoamerican Health Initiative 2015].

    PubMed

    Rivera, Juan A; Martorell, Reynaldo; González, Wendy; Lutter, Chessa; Cossío, Teresa González de; Flores-Ayala, Rafael; Uauy, Ricardo; Delgado, Hernán

    2011-01-01

    To describe the regional master plan of nutrition to address maternal and child malnutrition in a 5- year period developed by the Nutrition Technical Group. The Nutrition Technical Group developed a situation analysis describing the main nutrition problems, policies and programs in Mesoamerica. The situation analysis and a literature review about effective interventions to address malnutrition were conducted to develop a nutrition master plan. The Nutrition Technical Group held various meetings to develop, discuss and validate the master plan. Theory of change identified problems and barriers, the actions to be developed, the changes and impacts expected. A package of interventions is proposed to reduce undernutrition and micronutrient deficiencies useful under different epidemiological contexts. The nutrition master plan provides a guideline of best practices that can be used for evidence-informed decision making and the development of national policies and programs to reduce malnutrition.

  12. A Retrospective on Educational Planning in Comparative Education.

    ERIC Educational Resources Information Center

    Farrell, Joseph P.

    1997-01-01

    Defines and broadly traces the history of educational planning in both developing and industrialized capitalist nations. Discusses general approaches to educational planning (technical versus political planning, top-down versus bottom-up planning, and various theoretical bases); the contingency view of planning; case examples of planned,…

  13. Multicentre analysis of treatment planning information: technical requirements, possible applications and a proposal.

    PubMed

    Ebert, M A; Blight, J; Price, S; Haworth, A; Hamilton, C; Cornes, D; Joseph, D J

    2004-09-01

    Digital data from 3-D treatment planning computers is generally used for patient planning and then never considered again. However, such data contains enormous quantities of information regarding patient geometries, tissue outlining, treatment approaches and dose distributions. Were such data accessible from planning systems from multiple manufacturers, there would be substantial opportunities for undertaking quality assurance of radiotherapy clinical trials, prospective assessment of trial outcomes and basic treatment planning research and development. The technicalities of data exchange between planning systems are outlined, and previous attempts at producing systems capable of viewing and/or manipulating imaging and radiotherapy digital data reviewed. Development of a software system for enhancing the quality of Australasian clinical trials is proposed.

  14. Planning satellite communication services and spectrum-orbit utilization

    NASA Technical Reports Server (NTRS)

    Sawitz, P. H.

    1982-01-01

    The relationship between approaches to planning satellite communication services and spectrum-orbit utilization is considered, with emphasis on the fixed-satellite and the broadcasting-satellite services. It is noted that there are several possible approaches to planning space services, differing principally in the rigidity with which technical parameters are prescribed, in the time for which a plan remains in force, and in the procedures adopted for implementation and modifications. With some planning approaches, spectrum-orbit utilization is fixed at the time the plan is made. Others provide for greater flexibility by making it possible to postpone some decisions on technical parameters. In addition, the two political questions of what is equitable access and how it can be guaranteed in practice play an important role.

  15. For Work-Force Training, a Plan to Give College Credit Where It's Due

    ERIC Educational Resources Information Center

    Sander, Libby

    2008-01-01

    After nearly three years of planning, Ohio's higher-education officials are finalizing an ambitious program to grant college credit for some technical courses offered at the state's adult-education centers. The program, called the Career-Technical Credit Transfer, is the latest in a string of state efforts to more closely link work-force training…

  16. Strategic Business Plan for Economic Development Contract Services, July 1995-June 1997.

    ERIC Educational Resources Information Center

    Fox Valley Technical Coll., Appleton, WI.

    This plan describes the contract training and technical assistance services provided by Wisconsin's Fox Valley Technical College (FVTC) to area employers, focusing on the status of the services and ways to improve delivery for the July 1995 to June 1997 period. Following an executive summary, the second section focuses on contract services…

  17. TWRS Configuration management program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  18. 76 FR 18649 - Technical Revisions to Actuarial Information on Form 5500 Annual Return/Report for Pension Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 29 CFR Part 2520 Technical Revisions... Alternatives Under Pension Relief Act of 2010 AGENCY: Employee Benefits Security Administration, Labor. ACTION... 5500 Annual Return/Report of Employee Benefit Plan have been adopted in IRS Notice 2010-83 (2010-51 I.R...

  19. An Assessment of Future Educational and Occupational Plans for Brevard Community College Technical Program Students.

    ERIC Educational Resources Information Center

    Whitehead, Everett

    This practicum studies the future educational and/or occupational plans of 223 technical program students enrolled in Brevard Community College (BCC) during the Fall 1973 term in order to suggest adjustments in college procedures to facilitate student transition to continued college or to their chosen professions. The characteristics of technical…

  20. A Plan of Organization, Administration, and Elements of Finance for Vocational-Technical Adult Education, Birmingham City School System.

    ERIC Educational Resources Information Center

    Shelton, John Alton

    Designed to help formulate a plan of organization and administration for vocational and technical education and adult education in the Birmingham, Alabama, city schools, this study entailed an extensive literature review on vocational education and administrative matters; a historical review of several Birmingham schools (Paul Hayne School,…

  1. A National Periodicals Center Technical Development Plan.

    ERIC Educational Resources Information Center

    Council on Library Resources, Inc., Washington, DC.

    This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…

  2. Technical Report on Manpower Planning. Technical Group Report No. 7.

    ERIC Educational Resources Information Center

    Montana Commission on Post-Secondary Education, Helena.

    The report is one of a series containing data and recommendations relevant to the task of developing future plans for Montana's post-secondary education. A brief introduction outlines the methods used in gathering information on manpower needs, and is followed by a review and summarization of the data collected, including a description, analysis,…

  3. 76 FR 43963 - Regional Haze State Implementation Plan; State of Nevada; Extension of Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... deadline for written comments on the proposed approval of the Regional Haze SIP by 30 days to August 22... technical materials that form the basis of Nevada's Regional Haze SIP and EPA's proposed approval. The EPA...'s proposed approval of the technical analyses presented in Nevada's plan. DATES: The comment period...

  4. Jobsite Supervisor Instructor's Manual for Electrical Apprentice Technical Training. Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    One hundred and sixteen lesson plans for a first, second, third and fourth year electrical apprentice technical training program are presented in this manual. The lesson plans are generally organized into four steps: introducing the lesson, presenting the lessons (e.g., demonstration), student application (use of worksheets), and checking and…

  5. Gender Planning and Vocational Education, and Technical Training in Palestine: An Initial Framework. Gender and Society Working Paper #4.

    ERIC Educational Resources Information Center

    Nahleh, Lamis Abu

    Gender planning and vocational education and technical training (VETT) in Palestine were examined through the following: review of available literature and policy-oriented reports, discussions with educators in the field, and roundtable discussion in which representatives of the Palestinian Ministry of Education and Ministry of Labor and experts…

  6. 40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...

  7. 40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...

  8. 40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...

  9. Internal Controls for the Military Sealift Command Portion of the Transportation Business Area of the FY 1994 Defense Business Operations Fund Financial Statements

    DTIC Science & Technology

    1995-06-28

    Secondary Reports Dilution Unit, Audit Planning and Technical Support Directorate, at (703) 604-8937 (DSN 664-8937) or FAX (703) 604-8932. Suggestions...for Future Audits To suggest ideas for or to request future audits , contact the Planning and Coordination Branch, Audit Planning and Technical...Defense OAIG-AUD (ATTN: APTS Audit Suggestions) 400 Army Navy Drive (Room 801) Arlington, Virginia 22202-2884 DoD Hotline To report fraud, waste

  10. Structural dynamics division research and technology accomplishments for F.Y. 1991 and plans for F.Y. 1992

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1992-01-01

    The work under each technical area is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest. The structural dynamics division consist of the following branches: configuration aeroelasticity; unsteady aerodynamics; aeroservoelasticity; landing and impact dynamics; and spacecraft dynamics.

  11. Egypt boosts family planning.

    PubMed

    1977-10-27

    A $4 million Agency for International Development (AID) agreement was signed in Cairo September 30 which will help the Egyptian government increase family planning services. The project is in response to a request for up to $17 million of AID funds for family planning programs during the next 3 years. The funds will pay for: contract advisors to provide short-term in-country training of physicians, architectural and engineering services to renovate a hospital for family planning and obstetrics/gynecology training, and a field training site for family planning service providers. Some Egyptians will receive training in specialized areas in the U.S. and other countries. More than $1.5 million of the $4 million will finance local costs of goods and services required. In addition, it is anticipated that U.S.-owned local currencies will be obligated for direct support of U.S. technical personnel. Over the 3-year life of the project the $17 million from AID plus $664,000 of U.S.-owned local currency will cover 44% of the total costs of selected Egyptian family planning activities. The Egyptian government will contribute at least $18.4 million and the U.N. Fund for Population Activities and the International Bank for Reconstruction and Development will contribute $4.3 million.

  12. NASA' s life sciences and space radiation biology.

    PubMed

    Rambaut, P; Nicogossian, A

    1984-01-01

    Plans for the various missions in which men and women are expected to participate during the next 10 years are outlined. Such missions include flights of up to three months duration in low earth orbit as well as possible short excursions to geosynchronous orbit. Research activities are described which cover the full spectrum of physiological and psychological responses to space flight. These activities are shown to contribute to the ongoing Shuttle program and the future Space Station. The paper includes a summary of the major technical thrusts needed to support extended habitation in space.

  13. 7 CFR 4284.630 - Other considerations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1940 of this title. Applications for technical assistance or planning projects are generally excluded... within their plans the important environmental factors within the planning area and the potential environmental impacts of the plan on the planning area, as well as the alternative planning strategies that were...

  14. An overview and guide: planning instructional radio.

    PubMed

    Imhoof, M

    1984-03-01

    Successful instructional radio projects require both comprehensive and complex planning. The instructional radio planning team needs to have knowledge and capabilities in several technical, social, and educational areas. Among other skills, the team must understand radio, curriculum design, the subject matter being taught, research and evaluation, and the environment in which the project operates. Once a basic approach to educational planning has been selected and broad educational goals set, radio may be selected as a cost effective means of achieving some of the goals. Assuming radio is a wise choice, there are still several factors which must be analyzed by a team member who is a radio specialist. The most obvious consideration is the inventory and evaluation of the facilities: studios; broadcast, recording, and transmission equipment; classroom radios; and so on. Capabilities of broadcast personnel are another consideration. Initial radio lessons need to teach the learners how to listen to the radio if they have no previous experience with institutional radio broadcasts. A captive, inschool audience ready to listen to radio instructions requires a different use of the medium than a noncaptive audience. With the noncaptive audience, the educational broadcaster must compete with entertaining choices from other media and popular activities and pastimes of the community. The most complex knowledge and analysis required in planning instructional radio concerns the relationship of the content to the medium. Environmental factors are important in planning educational programs. The physical environment may present several constraints on the learning experience and the use of radio. The most obvious is the effect of climate and terrain on the quality of radio reception. The physical environment is easily studied through experience in the target area, but this knowledge plays a significant role in designing effective learning materials for specific learners. Social activities utilized in broadcasts which are contrary to the learners' experience will at best seem strange and at worst be incomprehensible. Curriculum development in an instructional radio project adds more complexity to the planner's task. The most important information needed is whether a new curriculum is to be developed or whether the existing curriculum is to be adapted for radio. Another major analysis task is relating the curriculum to the medium. The project planning team needs to understand the research aims and evaluation methods in instructional radio projects. Sometimes an outside evaluation specialist or team is employed, but in many projects the planning team is responsible for implementing the research design, carrying out the development activities, gathering data, and evaluating the project. Subject matter testing is another technical area of expertise needed by the project team.

  15. Spectrum orbit utilization program technical manual SOUP5 Version 3.8

    NASA Technical Reports Server (NTRS)

    Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.

    1984-01-01

    The underlying engineering and mathematical models as well as the computational methods used by the SOUP5 analysis programs, which are part of the R2BCSAT-83 Broadcast Satellite Computational System, are described. Included are the algorithms used to calculate the technical parameters and references to the relevant technical literature. The system provides the following capabilities: requirements file maintenance, data base maintenance, elliptical satellite beam fitting to service areas, plan synthesis from specified requirements, plan analysis, and report generation/query. Each of these functions are briefly described.

  16. Space Station RT and E Utilization Study

    NASA Technical Reports Server (NTRS)

    Wunsch, P. K.; Anderson, P. H.

    1989-01-01

    Descriptive information on a set of 241 mission concepts was reviewed to establish preliminary Space Station outfitting needs for technology development missions. The missions studied covered the full range of in-space technology development activities envisioned for early Space Station operations and included both pressurized volume and attached payload requirements. Equipment needs were compared with outfitting plans for the life sciences and microgravity user communities, and a number of potential outfitting additions were identified. Outfitting implementation was addressed by selecting a strawman mission complement for each of seven technical themes, by organizing the missions into flight scenarios, and by assessing the associated outfitting buildup for planning impacts.

  17. NASA / GE Aviation Collaborative Partnership Research in Ultra High Bypass Cycle Propulsion Concepts

    NASA Technical Reports Server (NTRS)

    Hughes, Christopher E.; Zeug, Theresa

    2008-01-01

    Current collaborative research with General Electric Aviation on Open Rotor propulsion as part of the Subsonic Fixed Wing Project Ultra High Bypass Engine Partnership Element is discussed. The Subsonic Fixed Wing Project goals are reviewed, as well as their relative technology level compared to previous NASA noise program goals. The current Open Rotor propulsion research activity at NASA and GE are discussed including the contributions each entity bring toward the research project, and technical plans and objectives. GE Open Rotor propulsion technology and business plans currently and toward the future are also discussed, including the role the NASA SFW UHB partnership plays toward achieving those goals.

  18. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  19. Quarterly Performance/Technical Report of the National Marrow Donor Program

    DTIC Science & Technology

    2010-03-31

    Implemented the Business to Business ( B2B ) Gateway and Business Services to support : • Incoming HLA typing results incorporating HLA Nomenclature changes...maintenance was performed. IIA.3.2 Task 2: Critical Facility and Staff Related Functions Period 6 Activity: • Business Continuity Planning: o Continued...department development of appropriate detailed tasks to be tested at a remote (non-NMDP controlled) location for the 2010 Business Continuity

  20. A Practical Guide To Developing Effective Web-based Learning

    PubMed Central

    Cook, David A; Dupras, Denise M

    2004-01-01

    OBJECTIVE Online learning has changed medical education, but many “educational” websites do not employ principles of effective learning. This article will assist readers in developing effective educational websites by integrating principles of active learning with the unique features of the Web. DESIGN Narrative review. RESULTS The key steps in developing an effective educational website are: Perform a needs analysis and specify goals and objectives; determine technical resources and needs; evaluate preexisting software and use it if it fully meets your needs; secure commitment from all participants and identify and address potential barriers to implementation; develop content in close coordination with website design (appropriately use multimedia, hyperlinks, and online communication) and follow a timeline; encourage active learning (self-assessment, reflection, self-directed learning, problem-based learning, learner interaction, and feedback); facilitate and plan to encourage use by the learner (make website accessible and user-friendly, provide time for learning, and motivate learners); evaluate learners and course; pilot the website before full implementation; and plan to monitor online communication and maintain the site by resolving technical problems, periodically verifying hyperlinks, and regularly updating content. CONCLUSION Teaching on the Web involves more than putting together a colorful webpage. By consistently employing principles of effective learning, educators will unlock the full potential of Web-based medical education. PMID:15209610

  1. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  2. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  3. 76 FR 43175 - Approval of Air Quality Implementation Plans; Indiana and Ohio; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... impact. EPA stated that the state's conclusion should be supported by an adequate technical analysis. EPA... by an adequate technical analysis. IDEM did not provide a technical analysis in its submittal, but... technical analysis and justification necessary to make that demonstration. Indiana did not provide any...

  4. IMPLICATIONS OF WOMEN'S WORK PATTERNS FOR PROGRAM DEVELOPMENT IN VOCATIONAL AND TECHNICAL EDUCATION.

    ERIC Educational Resources Information Center

    LEE, SYLVIA L.; AND OTHERS

    THE IMPLICATIONS OF WOMEN'S LABOR FORCE PARTICIPATION FOR EDUCATORS AND LEADERS PLANNING PROGRAMS IN VOCATIONAL AND TECHNICAL EDUCATION WERE DERIVED AT A 2-DAY CONFERENCE BY 30 PEOPLE REPRESENTING THE VARIOUS SERVICES IN VOCATIONAL-TECHNICAL EDUCATION AND RELATED AREAS. IMPLICATIONS AND RECOMMENDATIONS FOR VOCATIONAL AND TECHNICAL EDUCATION…

  5. Approaching 4 Decades of Legislation in the National Family Planning Program: An Analysis of Title X's History From 1970 to 2008

    PubMed Central

    Daley, Ellen M.; Perrin, Kay M.; Mahan, Charles S.; Buhi, Eric R.

    2011-01-01

    Family planning is an important public health activity. Title X (Pub L No. 91-572), enacted in 1970, remains the only national family planning program in the United States dedicated to providing voluntary and confidential services to all individuals. We conducted a thematic analysis of Title X's legislative history. Of 293 federal bills included in the legislative history, only 20 (6.8%) were enacted into law. Regardless of the proposed challenges, limited changes have been adopted. Except for technical amendments, bills involving restrictions accounted for the highest percentage of enacted bills, demonstrating efforts to undermine reproductive health rights. Title X requires political will and bipartisan support if it is to continue to protect individuals' reproductive rights. PMID:21940931

  6. Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramuhalli, Pradeep; Devanathan, Ram; Meyer, Ryan M.

    As U.S. nuclear power plants look to subsequent license renewal (SLR) to operate for a 20-year period beyond 60 years, the U.S. Nuclear Regulatory Commission and the industry will be addressing technical issues around the capability of long-lived passive components to meet their functionality objectives. A key challenge will be to better understand likely materials degradation mechanisms in these components and their impacts on component functionality and margins to safety. Research addressing many of the remaining technical gaps in these areas for SLR may greatly benefit from materials sampled from plants (decommissioned or operating). Because of the cost and inefficiencymore » of piecemeal sampling, there is a need for a strategic and systematic approach to sampling materials from structures, systems, and components (SSC) in both operating and decommissioned plants. This document describes a potential approach for sampling (harvesting) materials that focuses on prioritizing materials for sampling using a number of criteria. These criteria are based on an evaluation of technical gaps identified in the literature, research needs to address these technical gaps, and lessons learned from previous harvesting campaigns. The document also describes a process for planning future harvesting campaigns; such a plan would include an understanding of the harvesting priorities, available materials, and the planned use of the materials to address the technical gaps.« less

  7. First International Symposium on Strain Gauge Balances. Pt. 1

    NASA Technical Reports Server (NTRS)

    Tripp, John S. (Editor); Tcheng, Ping (Editor)

    1999-01-01

    The first International Symposium on Strain Gauge Balances was sponsored and held at NASA Langley Research Center during October 22-25, 1996. The symposium provided an open international forum for presentation, discussion, and exchange of technical information among wind tunnel test technique specialists and strain gauge balance designers. The Symposium also served to initiate organized professional activities among the participating and relevant international technical communities. Over 130 delegates from 15 countries were in attendance. The program opened with a panel discussion, followed by technical paper sessions, and guided tours of the National Transonic Facility (NTF) wind tunnel, a local commercial balance fabrication facility, and the LaRC balance calibration laboratory. The opening panel discussion addressed "Future Trends in Balance Development and Applications." Forty-six technical papers were presented in 11 technical sessions covering the following areas: calibration, automatic calibration, data reduction, facility reports, design, accuracy and uncertainty analysis, strain gauges, instrumentation, balance design, thermal effects, finite element analysis, applications, and special balances. At the conclusion of the Symposium, a steering committee representing most of the nations and several U.S. organizations attending the Symposium was established to initiate planning for a second international balance symposium, to be held in 1999 in the UK.

  8. First International Symposium on Strain Gauge Balances. Part 2

    NASA Technical Reports Server (NTRS)

    Tripp, John S (Editor); Tcheng, Ping (Editor)

    1999-01-01

    The first International Symposium on Strain Gauge Balances was sponsored and held at NASA Langley Research Center during October 22-25, 1996. The symposium provided an open international forum for presentation, discussion, and exchange of technical information among wind tunnel test technique specialists and strain gauge balance designers. The Symposium also served to initiate organized professional activities among the participating and relevant international technical communities. Over 130 delegates from 15 countries were in attendance. The program opened with a panel discussion, followed by technical paper sessions, and guided tours of the National Transonic Facility (NTF) wind tunnel, a local commercial balance fabrication facility, and the LaRC balance calibration laboratory. The opening panel discussion addressed "Future Trends in Balance Development and Applications." Forty-six technical papers were presented in 11 technical sessions covering the following areas: calibration, automatic calibration, data reduction, facility reports, design, accuracy and uncertainty analysis, strain gauges, instrumentation, balance design, thermal effects, finite element analysis, applications, and special balances. At the conclusion of the Symposium, a steering committee representing most of the nations and several U.S. organizations attending the Symposium was established to initiate planning for a second international balance symposium, to be held in 1999 in the UK.

  9. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  10. Instructor's Manual for Electrical Apprentice Technical Training. Series No. D (Fourth Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Twenty-seven lesson plans for a fourth-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into four steps:…

  11. Colombo Plan Intra-Regional Technician Training Colloquium (6th, Kuala Lumpur, Malaysia, April 21-25, 1975).

    ERIC Educational Resources Information Center

    Colombo Plan Bureau (Sri Lanka).

    Proceedings of the Sixth Colloquium on Intra-Regional Technical Training sponsored jointly by the Colombo Plan and the Government of Malaysia are presented in this report. Four working papers are presented centered around three main areas of concern: influence of technical education on economic development; how the status of technicians could be…

  12. Instructor's Manual for Electrical Apprentice Technical Training. Series No. A (First Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Thirty-six lesson plans for the first of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into…

  13. Instructor's Manual for Electrical Apprentice Technical Training. Series No. B (Second Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Twenty-eight lesson plans for the second year of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized…

  14. Strategic Mobility 21 Project Management Plan

    DTIC Science & Technology

    2006-09-29

    California Association of Governments (SCAG), and other stakeholders to transform the former military installation into a modern in-land distribution node... governments , including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were...required updates of both the ICD and the Technical Plan. SM21 has established a consortium of public and private, governmental and non

  15. Convergence Properties of a Class of Probabilistic Adaptive Schemes Called Sequential Reproductive Plans. Psychology and Education Series, Technical Report No. 210.

    ERIC Educational Resources Information Center

    Martin, Nancy

    Presented is a technical report concerning the use of a mathematical model describing certain aspects of the duplication and selection processes in natural genetic adaptation. This reproductive plan/model occurs in artificial genetics (the use of ideas from genetics to develop general problem solving techniques for computers). The reproductive…

  16. Enterprise Planning for Change; Co-ordination of Manpower and Technical Planning. Industrial Relations Aspects of Manpower Policy, No. 5.

    ERIC Educational Resources Information Center

    Wedderburn, Dorothy

    Forty case studies made by research teams of independents or governmental agencies in Austria, Canada, France, Germany, Norway, Sweden, United Kingdom, and the United States were analyzed to provide managements and trade unions with illustrations of present systems of technical and manpower changes at the enterprise level and to describe the…

  17. Improvements in State and Local Planning for Mass Dispensing of Medical Countermeasures: The Technical Assistance Review Program, United States, 2007–2014

    PubMed Central

    Vagi, Sara J.; Reinold, Chris M.; Silverman, Brenda L.; Avchen, Rachel N.

    2017-01-01

    Objectives. To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. Methods. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention’s Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. Results. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Conclusions. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success. PMID:28892441

  18. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  19. ATF Neutron Irradiation Program Technical Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geringer, J. W.; Katoh, Yutai

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization ofmore » irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.« less

  20. Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Haynes, Davy A.; Taylor, Terry L.; Hall, Robert M.; Pamadi, Bandu N.; Seaford, C. Mark

    2006-01-01

    Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.

  1. Planning emergency medical communications

    DOT National Transportation Integrated Search

    1996-06-01

    This technical bulletin summarizes a two volume publication entitled "Planning Emergency Medical Communications." Volume One, the State Level Planning Guide, contains general background information about a two tiered approach to EMS communications pl...

  2. IN SITU FIELD TESTING OF PROCESSES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.S.Y. YANG

    2004-11-08

    The purpose of this scientific analysis report is to update and document the data and subsequent analyses from ambient field-testing activities performed in underground drifts and surface-based boreholes through unsaturated zone (UZ) tuff rock units. In situ testing, monitoring, and associated laboratory studies are conducted to directly assess and evaluate the waste emplacement environment and the natural barriers to radionuclide transport at Yucca Mountain. This scientific analysis report supports and provides data to UZ flow and transport model reports, which in turn contribute to the Total System Performance Assessment (TSPA) of Yucca Mountain, an important document for the license applicationmore » (LA). The objectives of ambient field-testing activities are described in Section 1.1. This report is the third revision (REV 03), which supercedes REV 02. The scientific analysis of data for inputs to model calibration and validation as documented in REV 02 were developed in accordance with the Technical Work Plan (TWP) ''Technical Work Plan for: Performance Assessment Unsaturated Zone'' (BSC 2004 [DIRS 167969]). This revision was developed in accordance with the ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654], Section 1.2.4) for better integrated, consistent, transparent, traceable, and more complete documentation in this scientific analysis report and associated UZ flow and transport model reports. No additional testing or analyses were performed as part of this revision. The list of relevant acceptance criteria is provided by ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654]), Table 3-1. Additional deviations from the TWP regarding the features, events, and processes (FEPs) list are discussed in Section 1.3. Documentation in this report includes descriptions of how, and under what conditions, the tests were conducted. The descriptions and analyses provide data useful for refining and confirming the understanding of flow, drift seepage, and transport processes in the UZ. The UZ testing activities included measurement of permeability distribution, quantification of the seepage of water into the drifts, evaluation of fracture-matrix interaction, study of flow along faults, testing of flow and transport between drifts, characterization of hydrologic heterogeneity along drifts, estimation of drying effects on the rock surrounding the drifts due to ventilation, monitoring of moisture conditions in open and sealed drifts, and determination of the degree of minimum construction water migration below drift. These field tests were conducted in two underground drifts at Yucca Mountain, the Exploratory Studies Facility (ESF) drift, and the cross-drift for Enhanced Characterization of the Repository Block (ECRB), as described in Section 1.2. Samples collected in boreholes and underground drifts have been used for additional hydrochemical and isotopic analyses for additional understanding of the UZ setting. The UZ transport tests conducted at the nearby Busted Butte site (see Figure 1-4) are also described in this scientific analysis report.« less

  3. 15 CFR 295.6 - Criteria for selection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... proposal will be funded unless the Program determines that it has scientific and technological merit and... does not have an adequate technical and commercialization plan. (a) Scientific and technological merit... innovation, the technical approach, major technical hurdles, the attendant risks, and clearly establish...

  4. TADS Needs Assessment Procedures Manual, Summer 1980.

    ERIC Educational Resources Information Center

    Black, Talbot; And Others

    The TADS (Technical Assistance Development System) Needs Assessment Manual is designed to guide the comprehensive review of Handicapped Children's Early Education Program (HCEEP) demonstration projects in identifying technical assistance needs. An introduction reviews the TADS technical assistance model which includes program planning, needs…

  5. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options.

    PubMed

    Rani, Manju; Nusrat, Sharmin; Hawken, Laura H

    2012-10-16

    Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.

  6. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options

    PubMed Central

    2012-01-01

    Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232

  7. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    DOT National Transportation Integrated Search

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  8. The Myth of Employee Planning for Retirement

    ERIC Educational Resources Information Center

    Morrison, Malcolm H.

    1975-01-01

    A survey of male hourly-wage earners indicates employees face serious problems in planning for income security in retirement. Retirement preparation programs that supply information and technical planning expertise are needed to assist employees in realistic retirement planning. (EA)

  9. Energy materials coordinating committee (EMACC) Fiscal Year 1982. Annual technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    1983-03-01

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further the effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/ workshops on selected topics involving both DOE and major contractors. In addition, the EMaCC aids in obtaining materials - related inputs for both intra- and interagency compilations. Membership in the EMaCC is open to any Department organizational unit; participants are appointed by Division or Office Directors. The current membership is listed inmore » Table 1. The EMACC reports to the Director of the Office of Energy Research in his capacity as overseer of the technical programs of the Department. This annual technical report is mandated by the EMACC terms of reference. In this report are described 1) EMACC activities for FY 1982; 2) a summary of materials funding in the Department from FY 1978 to the present; and 3) on-going materials programs in the Department.« less

  10. 7 CFR 1780.54 - Technical services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Constructing and Inspections § 1780.54 Technical services. Owners are responsible for providing the engineering, architect and environmental services necessary for planning, designing, bidding, contracting, inspecting...

  11. 78 FR 52680 - Amendment to the International Traffic in Arms Regulations: Registration and Licensing of Brokers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ...The Department of State is issuing this interim final rule amending the International Traffic in Arms Regulations (ITAR) relating to brokers and brokering activities and to related provisions of the ITAR. These amendments clarify registration requirements, the scope of brokering activities, prior approval requirements and exemptions, procedures for obtaining prior approval and guidance, and reporting and recordkeeping of such activities. Conforming and technical changes are made to other parts of the ITAR that affect export as well as brokering activities. The revisions contained in this rule are part of the Department of State's retrospective plan under E.O. 13563 completed on August 17, 2011.

  12. The Technical Assistance Program: A Program Plan.

    DTIC Science & Technology

    1985-09-01

    interests, talents, and hobbies of current employees who wish to become involved in the technical assistance program . 4. Capitalize on the corporate...Center San Diego, CA 92152 Telephone (619) 225-6281 B-33 TAP ( EMPLOYEE ) QUESTIONNAIRE - The Technical Assistance Program (TAP) links technically skilled...Brochure, "Retired Technologist" C-11 C. Sample Letter to NOSC Employees C-13 Brochure D. The Technical Assistance Program C-15 C-1

  13. The systems engineering upgrade intiative at NASA's Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    Jones, Ross M.

    2005-01-01

    JPL is implementing an initiative to significantly upgrade our systems engineering capabilities. This Systems Engineering Upgrade Initiative [SUI] has been authorized by the highest level technical management body of JPL and is sponsored with internal funds. The SUI objective is to upgrade system engineering at JPL to a level that is world class, professional and efficient compared to the FY04/05 baseline. JPL system engineering, along with the other engineering disciplines, is intended to support optimum designs; controlled and efficient implementations; and high quality, reliable, cost effective products. SUI technical activities are categorized into those dealing with people, process and tools. The purpose of this paper is to describe the rationale, objectives/plans and current status of the JPL SUI.

  14. Proceedings of the 16th NASA Propagation Experimenters Meeting (NAPEX 16) and the Advanced Communications Technology Satellite (ACTS) Propagation Studies Miniworkshop

    NASA Technical Reports Server (NTRS)

    Davarian, Faramaz (Editor)

    1992-01-01

    The NASA Propagation Experimenters Meeting (NAPEX), supported by the NASA Propagation Program, is convened annually to discuss studies made on radio wave propagation by investigators from domestic and international organizations. NAPEX 16 was held on May 29, 1992 in Houston, Texas. The meeting was organized into two technical sessions. The first session was dedicated to slant path propagation studies and measurements. The second session focused on Olympus propagation measurements and results. Following NAPEX 16, the Advanced Communications Technology Satellite (ACTS) Miniworkshop was held to review ACTS propagation activities with emphasis on ACTS hardware development and experiment planning. Eight technical papers were presented by contributors from government agencies, private industry, and university research establishments.

  15. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 1B: Concise review

    NASA Technical Reports Server (NTRS)

    Miller, R. E., Jr.; Southall, J. W.; Kawaguchi, A. S.; Redhed, D. D.

    1973-01-01

    Reports on the design process, support of the design process, IPAD System design catalog of IPAD technical program elements, IPAD System development and operation, and IPAD benefits and impact are concisely reviewed. The approach used to define the design is described. Major activities performed during the product development cycle are identified. The computer system requirements necessary to support the design process are given as computational requirements of the host system, technical program elements and system features. The IPAD computer system design is presented as concepts, a functional description and an organizational diagram of its major components. The cost and schedules and a three phase plan for IPAD implementation are presented. The benefits and impact of IPAD technology are discussed.

  16. Chemistry, manufacturing and control (CMC) and clinical trial technical support for influenza vaccine manufacturers.

    PubMed

    Wahid, Rahnuma; Holt, Renee; Hjorth, Richard; Berlanda Scorza, Francesco

    2016-10-26

    With the support of the Biomedical Advanced Research and Development Authority (BARDA) of the US Department of Health and Human Services, PATH has contributed to the World Health Organization's (WHO's) Global Action Plan for Influenza Vaccines (GAP) by providing technical and clinical assistance to several developing country vaccine manufacturers (DCVMs). GAP builds regionally based independent and sustainable influenza vaccine production capacity to mitigate the overall global shortage of influenza vaccines. The program also ensures adequate influenza vaccine manufacturing capacity in the event of an influenza pandemic. Since 2009, PATH has worked closely with two DCVMs in Vietnam: the Institute of Vaccines and Medical Biologicals (IVAC) and VABIOTECH. Beginning in 2013, PATH also began working with Torlak Institute in Serbia; Instituto Butantan in Brazil; Serum Institute of India Private Ltd. in India; and Changchun BCHT Biotechnology Co. (BCHT) in China. The DCVMs supported under the GAP program all had existing influenza vaccine manufacturing capability and required technical support from PATH to improve vaccine yield, process efficiency, and product formulation. PATH has provided customized technical support for the manufacturing process to each DCVM based on their respective requirements. Additionally, PATH, working with BARDA and WHO, supported several DCVMs in the clinical development of influenza vaccine candidates progressing toward national licensure or WHO prequalification. As a result of the activities outlined in this review, several companies were able to make excellent progress in developing state-of-the-art manufacturing processes and completing early phase clinical trials. Licensure trials are currently ongoing or planned for several DCVMs. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Tribal Colleges and Universities/American Indian Research and Education Initiatives Advanced Manufacturing Technical Assistance Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atcitty, Stanley

    The overall goal of this project is to establish a network of TCUs with essential advanced manufacturing (AM) facilities, associated training and education programs, and private sector and federal agency partnerships to both prepare an American Indian AM workforce and create economic and employment opportunities within Tribal communities through design, manufacturing, and marketing of high quality products. Some examples of high quality products involve next generation grid components such as mechanical energy storage, cabling for distribution of energy, and electrochemical energy storage enclosures. Sandia National Laboratories (Sandia) is tasked to provide technical advising, planning, and academic program development support formore » the TCU/American Indian Higher Education Consortium (AIHEC) Advanced Manufacturing Project. The TCUs include Bay Mills Community College (BMCC), Cankdeska Cikana Community College (CCCC), Navajo Technical University (NTU), Southwestern Indian Polytechnic Institute (SIPI), and Salish Kooteani College. AIHEC and Sandia, with collaboration from SIPI, will be establishing an 8-week summer institute on the SIPI campus during the summer of 2017. Up to 20 students from TCUs are anticipated to take part in the summer program. The goal of the program is to bring AM science, technology, engineering, and mathematics (STEM) awareness and opportunities for the American Indian students. Prior to the summer institute, Sandia will be providing reviews on curriculum plans at the each of the TCUs to ensure the content is consistent with current AM design and engineering practice. In addition, Sandia will provide technical assistance to each of the TCUs in regards to their current AM activities.« less

  18. Information transfer satellite concept study. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    Bergin, P.; Kincade, C.; Kurpiewski, D.; Leinhaupel, F.; Millican, F.; Onstad, R.

    1971-01-01

    The ITS concept study is preceded by two requirements studies whose primary objectives are to identify viable demands and to develop the functional requirements associated with these demands. In addition to continuing this basic activity the ITS concept study objectives are to: (1) develop tools and techniques for planning advanced information transfer satellite communications systems, and to (2) select viable systems for further analysis both in their near-term and in the far-term aspects.

  19. Natural Environments Definition for Design

    NASA Technical Reports Server (NTRS)

    Justh, H. L.; Altino, K. M.; Decker, R. K.; Koehler, H. M.; Leahy, F. B.; Minow, J. I.; Roberts, B. C.; Suggs, R. M.; Suggs, R. J.; White, P. W.; hide

    2016-01-01

    Planning for future National Aeronautics and Space Administration (NASA) missions will encompass a variety of operational and engineering activities that involve a multitude of issues, constraints, and influences derived from the natural environment. This Technical Memorandum (TM) presents a definition of the natural environment, i.e., a description in engineering handbook format of models and data specifically selected to support the architecture development, engineering design, and technology development for NASA's Exploration Systems Development (ESD) initiatives.

  20. UNIVERSITY RESEARCH PROGRAM IN ROBOTICS, Final Technical Annual Report, Project Period: 9/1/04 - 8/31/05

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James S. Tulenko; Carl D. Crane III

    The University Research Program in Robotics (URPR) Implementation Plan is an integrated group of universities performing fundamental research that addresses broad-based robotics and automation needs of the NNSA Directed Stockpile Work (DSW) and Campaigns. The URPR mission is to provide improved capabilities of robotics science and engineering to meet the future needs of all weapon systems and other associated NNSA/DOE activities.

  1. Professional, Technical and Kindred Workers: Where They Come From, Where They Go In The Commonwealth of Pennsylvania. Information For Student Career Planning.

    ERIC Educational Resources Information Center

    Driscoll, Jeanne Baker; Herr, Edwin L.

    Intended for use in occupational and education planning by students and counselors, this document contains information about the 106 occupations which are included in the professional, technical, and kindred workers cluster of the U.S. census. The occupations are grouped by field of interest. For each occupation, the information provided includes…

  2. TLOG: Training and Educating Operational Logistic Planners

    DTIC Science & Technology

    2008-05-22

    monograph recommends specific changes to the current curriculum. Additions in operational knowledge provide the students technical knowledge and a...common frame of reference in campaign planning. The changes result in students not only technically competent to design a concept of support, but...planning process. The implementation of these changes enhance TLog’s curriculum to meet the course’s stated goal; the graduates will be the

  3. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  4. A Study of the Educational and Manpower Needs of the Catawba Valley Technical Institute Impact Area.

    ERIC Educational Resources Information Center

    Sumerell, Craven H.

    The purpose of this study was to make a survey of the educational needs of the community served by the Catawba Valley Technical Institute (CVTI), the results of which would serve as a basis for the projection, planning, and revision of the CVTI instructional programs and the planning of physical facilities. In this cooperative venture, the data…

  5. Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report

    DTIC Science & Technology

    1990-04-05

    MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a

  6. 15 CFR 295.6 - Criteria for selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... innovation, the technical approach, major technical hurdles, the attendant risks, and clearly establish... project and project's organizational structure and management plan, including the extent to which...

  7. 40 CFR 52.1110 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... technical and environmental compliance assistance program. 52.1110 Section 52.1110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1110 Small business stationary source technical and environmental...

  8. Testing of Mortar Systems

    DTIC Science & Technology

    2010-03-11

    IEP /TDP) or Independent Assessment Plan (IAP), and the test item and the procedures as outlined in this TOP. The following must also be considered...Command DTIC = Defense Technical Information Center DTP = Detailed Test Plan IAP = Independent Assessment Plan IEP = Independent Evaluation Plan IPT

  9. Louisiana Airport System Plan.

    DOT National Transportation Integrated Search

    1992-10-01

    This report is a non-technical summary of the update to the Louisiana Airport System Plan. The system plan identifies the location, service level, and role of the 81 airports included in the plan and the costs to develop individual airports and the a...

  10. DOE-AVCP Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Latham, Brent

    The purpose of the Cooperative Agreement was based on the mission the two agencies have in common. The Association of Village Council Presidents (AVCP) has been a critical player in accomplishing what Alaskan Native communities need since 1964 with various programs including energy assistance. The AVCP/DOE Partnership enabled AVCP to assist 10 of 56 remote Alaska Native villages in the development of a community-led Community Energy Plan. These plans have empowered the 10 Tribes to address their own energy development needs. The community energy plans that AVCP assisted the communities with identified the community’s energy vision, goals, and a highmore » level project timeline of each goal. The plans also include the technical potential, resource assessment, grant and technical assistance resources. The AVCP/DOE Partnership also enabled AVCP to provide tribal leaders and staff from the 56 Federally-Recognized Tribes with information about the policies and programs of the Department, support regional workshops and forums, and provide directed technical assistance for initial energy project support.« less

  11. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  12. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  13. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...

  14. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  15. The Design, Planning and Control of Robotic Systems in Space

    NASA Technical Reports Server (NTRS)

    Dubowsky, Steven

    1996-01-01

    In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics.

  16. Camp Minden Draft QASP and Work Plan for Public Feedback

    EPA Pesticide Factsheets

    ESI has developed these operational plans, technical approaches, and related required resources based upon extensive review and planning for material removal, transportation, staging, and Contained Burn Chamber (CBC) destruction of materials.

  17. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  18. PUREX/UO{sub 3} deactivation project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retainedmore » during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.« less

  19. Management of technical date in Nihon Doro kodan

    NASA Astrophysics Data System (ADS)

    Hanada, Jun'ichi

    Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.

  20. Sources of population and family planning assistance.

    PubMed

    1983-01-01

    This document assesses the current status of population and family planning assistance throughout the world and provides brief sketches of the available sources including national governments, intergovernmental agencies such as the UNFPA and other UN entities, and nongovernmental funding, technical assistance, or funding and technical assistance organizations. The descriptions of aid-granting organizations describe their purposes, sources of funding, and activities, and give addresses where further information may be sought. At present about $100 million of the US $1 billion spent for family planning in developing countries each year comes from individuals paying for their own supplies and services, over $400 million is spent by national governments on their own programs, and about $450 million comes from developed country governments and private agencies. Over half of external assistance appears to be channeled through international agencies, and only a few countries provide a substantial proportion of aid bilaterally. In the past decade several governments, particularly in Asia, significantly increased the share of program costs they assumed themselves, and the most populous developing countries, China, India, and Indonesia, now contribute most of the funding for their own programs. Although at least 130 countries have provided population aid at some time, most is given by 12 industrialized countries. The US Agency for International Development (USAID) is the largest single donor, but the US share of population assistance has declined to 50% of all assistance in 1981 from 60% in the early 1970s. Governments of Communist bloc countries have made only small contributions to international population assistance. Most governmental asistance is in cash grant form, but loans, grants in kind, and technical assistance are also provided. Private organizations give assistance primarily to other private organizations in developing countries, and have been major innovators in research, training and service delivery. Loan assistance is provided by the World Bank for combined health, nutrition, and population projects as well as poupulation education. Although international population assistance from donor governments and private organizations increased from about $165 million in 1971 to about $445 million in 1980, the increase in constant value was only about 10% after inflation. About 2/3 of international assistance goes to family planning services and contraceptives; other activities receiving support are basic data collection, research, and IEC. Greatly increased expenditures will be needed if population stability is to be achieved.

  1. Approach to the E-ELT dome and main structure challenges

    NASA Astrophysics Data System (ADS)

    Bilbao, Armando; Murga, Gaizka; Gómez, Celia; Llarena, Javier

    2014-07-01

    The E-ELT as a whole could be classified as an extremely challenging project. More precisely, it should be defined as an array of many different sub-challenges, which comprise technical, logistical and managerial matters. This paper reviews some of these critical challenges, in particular those related to the Dome and the Main Structure, suggesting ways to face them in the most pragmatic way possible. Technical challenges for the Dome and the Main Structure are mainly related to the need to upscale current design standards to an order of magnitude larger design. Trying a direct design escalation is not feasible; it would not work. A design effort is needed to cross hybridize current design standards with technologies coming from other different applications. Innovative design is therefore not a wish but a must. And innovative design comes along with design risk. Design risk needs to be tackled from two angles: on the one hand through thorough design validation analysis and on the other hand through extensive pre-assembly and testing. And, once again, full scale integrated pre-assembly and testing of extremely large subsystems is not always possible. Therefore, defining a comprehensive test plan for critical components, critical subsystems and critical subassemblies becomes essential. Logistical challenges are linked to the erection site. Cerro Armazones is a remote site and this needs to be considered when evaluating transport and erection requirements. But it is not only the remoteness of the site that needs to be considered. The size of both Dome and Main Structure require large construction cranes and a well defined erection plan taking into account pre-assembly strategies, limited plan area utilization, erection sequence, erection stability during intermediate stages and, very specifically, efficient coordination between the Dome and the Main Structure erection processes. Managerial issues pose another set of challenges in this project. Both the size of the project and its special technical characteristics require specific managerial skills. Due to the size of the project it becomes essential to effectively manage and integrate a large number of suppliers and fabricators, of very different nature and geographically distributed. Project management plans need to cope with this situation. Also, extensive on site activities require intensive on site organization in line with large construction management strategies. Finally, the technical edge of the project requires deep technical understanding at management level in order to be able to take sound strategic decisions throughout the project in terms of the overall project quality, cost and schedule.

  2. The Water Framework Directive: The Challenges of Testing and Validation of Guidance Documents

    NASA Astrophysics Data System (ADS)

    Barth, F.; Bidoglio, G.; Murray, C. N.; Zaldivar, J.; Bouraoui, F.

    On the 23rd October 2000 the European Parliament and Council passed a Directive establishing a framework of community action in the field of water policy (Water Framework Directive- FWD). The Water Framework Directive (FWD) raises major challenges, these include an extremely demanding timetable, in particular in the nine preparatory years; the complexity of the text and the diversity of possible solutions to scientific, technical and practical questions. A further problem is that a common understanding and methodologies for the application of the different areas of the FWD do not necessarily exist. Member States have, historically, developed approaches to monitoring, impact assessment, economic analysis etc. that will need to be compared in order to be certain that they provide comparable level of results over the range of ecosystems covered in the European Union. Accession Countries will also have to start to adjust their environmental legislation to be compatible with EU Directives and standards. The Framework Water Directive imposes a series of deadlines for the reporting by Member States to the European Commission. In order to respond to this problem a Common Strategy on the Implementation of the Water Framework Directive is being developed by the European Commission and Member States. The aim of the development of this Common Strategy is to allow, as far as possible, a coherent and harmonious implementation of the Directive. Focus is on methodological questions related to a common understanding of the technical and scientific implications of the Directive. The aim is to clarify and develop, where appropriate, supporting technical and scientific information to assist in the practical implementation of the Directive. Guidance documents, advice for operational methods and other supporting documents will be developed for this purpose. A modular structure has been chosen for the overall strategy. The main modules are the key activities for the implementation process.. · Activity 1: Information sharing · Activity 2: Develop guidance on technical issues · Activity 3: Information and data management · Activity 4: Application, testing and validation The first three priorities have a more horizontal character. They are the key activities for developing a common understanding of the implementation of the Water Framework Directive. All these horizontal activities need to be integrated and made operational in the River Basin Management Plans. Activity 4 (Application, Testing and Validation) significantly contributes to this integration role by making these activities operational in the River Basin Management Plans. The integration step is crucial for the effective implementation of the WFD. The objective of Activity 4 is to ensure coherence amongst the different guidance documents and their cross applicability by testing the guidance documents in selected pilot river basins. To achieve these objectives a Network of pilot river basins and associated coastal zones (where applicable) will be identified, in close co- operation with WGs in Key Action 2, that are considered to represent a range of problems and conditions characteristic of those to be found in the application of the different guidelines. The Network of identified sites will used for testing and cross- validation of proposed WG guidelines. The Joint Research Centre is acting as the technical secretariat for the Scientific Coordination Committee who is responsible for Activity 4. The purpose of the present paper is to describe approach, methodology and timetable for integrated testing of guidance documents.

  3. Technical Assistance for Arts Facilities: A Sourcebook. A Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    This booklet is a directory of sources of technical assistance on problems relating to physical facilities for arts organizations. Wherever possible, agencies and organizations are described in their own words. Technical assistance in the area of physical facilities encompasses planning, financing, acquiring, renovating, designing, and maintaining…

  4. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less

  5. Orthorectified High Resolution Multispectral Imagery for Application to Change Detection and Analysis

    NASA Technical Reports Server (NTRS)

    Benkelman, Cody A.

    1997-01-01

    The project team has outlined several technical objectives which will allow the companies to improve on their current capabilities. These include modifications to the imaging system, enabling it to operate more cost effectively and with greater ease of use, automation of the post-processing software to mosaic and orthorectify the image scenes collected, and the addition of radiometric calibration to greatly aid in the ability to perform accurate change detection. Business objectives include fine tuning of the market plan plus specification of future product requirements, expansion of sales activities (including identification of necessary additional resources required to meet stated revenue objectives), development of a product distribution plan, and implementation of a world wide sales effort.

  6. The 1990 progress report and future plans

    NASA Technical Reports Server (NTRS)

    Friedland, Peter; Zweben, Monte; Compton, Michael

    1990-01-01

    This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.

  7. IAC level "O" program development

    NASA Technical Reports Server (NTRS)

    Vos, R. G.

    1982-01-01

    The current status of the IAC development activity is summarized. The listed prototype software and documentation was delivered, and details were planned for development of the level 1 operational system. The planned end product IAC is required to support LSST design analysis and performance evaluation, with emphasis on the coupling of required technical disciplines. The long term IAC effectively provides two distinct features: a specific set of analysis modules (thermal, structural, controls, antenna radiation performance and instrument optical performance) that will function together with the IAC supporting software in an integrated and user friendly manner; and a general framework whereby new analysis modules can readily be incorporated into IAC or be allowed to communicate with it.

  8. Challenges in building intelligent systems for space mission operations

    NASA Technical Reports Server (NTRS)

    Hartman, Wayne

    1991-01-01

    The purpose here is to provide a top-level look at the stewardship functions performed in space operations, and to identify the major issues and challenges that must be addressed to build intelligent systems that can realistically support operations functions. The focus is on decision support activities involving monitoring, state assessment, goal generation, plan generation, and plan execution. The bottom line is that problem solving in the space operations domain is a very complex process. A variety of knowledge constructs, representations, and reasoning processes are necessary to support effective human problem solving. Emulating these kinds of capabilities in intelligent systems offers major technical challenges that the artificial intelligence community is only beginning to address.

  9. Virtual surgical planning and 3D printing in repeat calvarial vault reconstruction for craniosynostosis: technical note.

    PubMed

    LoPresti, Melissa; Daniels, Bradley; Buchanan, Edward P; Monson, Laura; Lam, Sandi

    2017-04-01

    Repeat surgery for restenosis after initial nonsyndromic craniosynostosis intervention is sometimes needed. Calvarial vault reconstruction through a healed surgical bed adds a level of intraoperative complexity and may benefit from preoperative and intraoperative definitions of biometric and aesthetic norms. Computer-assisted design and manufacturing using 3D imaging allows the precise formulation of operative plans in anticipation of surgical intervention. 3D printing turns virtual plans into anatomical replicas, templates, or customized implants by using a variety of materials. The authors present a technical note illustrating the use of this technology: a repeat calvarial vault reconstruction that was planned and executed using computer-assisted design and 3D printed intraoperative guides.

  10. Guidelines for the planning and preparation of illustrated technical talks

    NASA Technical Reports Server (NTRS)

    Hubbard, H. H.

    1975-01-01

    Guidelines are presented for the preparation of illustrated talks which are audience oriented and which are aimed at the efficient transfer of technical information. Early decisions concerning the required number of slides are helpful in initial planning for a good quality talk. Detailed considerations are: the establishment of limited objectives, selection of appropriate slide material, development of a text which is well coordinated with the slides, and accurate timing.

  11. Information Resource Management Planning in the Office of the Under Secretary of Defense (Acquisition)

    DTIC Science & Technology

    1989-08-01

    Include in this plan the role of the Defense Technical Information Center (DTIC), the Defense Technology Security Administration ( DTSA ), and ODDR&E’s...DTIC = Defense Technical Information Center DTSA = Defense Technology Security Administration DUSD = Deputy Under Secretary of Defense Gloss. 2 DUSD...technologically sensitive requests. The Defense Technology Security Administi ation ( DTSA ) is developing a large system to track foreign military sales

  12. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...

  13. Connected vehicle impacts on transportation planning : technical memorandum #5 : case studies.

    DOT National Transportation Integrated Search

    2015-12-01

    The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...

  14. Guidelines for Establishing and Evaluating High School Technical Electromechanics Programs.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Div. of Vocational, Technical and Adult Education.

    Educators and industrial representatives developed these guidelines for school officials, instructors in technical education, and program and facility planners to use in planning a high school program in technical electromechanics. Designed to train students for entry into industry in applied electromechanics, the program includes electricity,…

  15. Impact of Automation on Technical Services.

    ERIC Educational Resources Information Center

    Rooks, Dana C.; Thompson, Linda L.

    1988-01-01

    Discusses the impact of automation on library technical services, and the need for library managers to be aware of the issues involved and to plan for future developments. The discussion focuses on the areas of job related concerns of technical staff, organizational structures, recruitment and training, and ergonomic considerations. (CLB)

  16. 76 FR 43136 - Approval and Promulgation of Air Quality Implementation Plan; Kentucky; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... supported by an adequate technical analysis. Second, EPA recommended the various types of information that... technical analysis, including, but not limited to, information concerning emissions in the state...: ``* * * without an adequate technical analysis EPA does not believe that states can sufficiently address the...

  17. 76 FR 2853 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... technical analysis submitted for parallel-processing by DNREC on December 9, 2010, to address significant... technical analysis submitted by DNREC for parallel-processing on December 9, 2010, to satisfy the... consists of a technical analysis that provides detailed support for Delaware's position that it has...

  18. 34 CFR 366.15 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Training and Technical Assistance § 366.15 What selection criteria does the Secretary use? The Secretary uses the following criteria to evaluate applications for new awards for training and technical... project; and (2) How the objectives further training and technical assistance with respect to planning...

  19. Vocational-Technical Education: A Plan for Monroe County, Florida.

    ERIC Educational Resources Information Center

    Mills, Hugh L., Sr., Ed.; Pilcher, Palmer, C., Ed.

    Suggested vocational-technical education programs for the Monroe County Florida school system are presented along with recommendations to implement the principle of coordinated career education in the public schools. Expansion of vocational-technical programs is emphasized to expose all students from kindergarten through Grade 12 to career…

  20. Colonialism and Secondary Technical Education in Hong Kong: 1945-1997

    ERIC Educational Resources Information Center

    Lau, Wai Wah; Kan, Flora

    2011-01-01

    This study examines the influence of the colonial experience (1945-1997) on the planning of secondary technical education in Hong Kong. Specifically, the origins of secondary technical institutions and their positioning in secondary education are examined. Primary source materials are used as the basis of investigation and analysis, supplemented…

  1. 40 CFR 52.744 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source technical and environmental compliance assistance program. 52.744 Section 52.744 Protection of Environment... PLANS Illinois> § 52.744 Small business stationary source technical and environmental compliance...

  2. 40 CFR 52.798 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source technical and environmental compliance assistance program. 52.798 Section 52.798 Protection of Environment... PLANS Indiana § 52.798 Small business stationary source technical and environmental compliance...

  3. Science-based strategic planning for hazardous fuel treatment.

    Treesearch

    D.L. Peterson; M.C. Johnson

    2007-01-01

    A scientific foundation coupled with technical support is needed to develop long-term strategic plans for fuel and vegetation treatments on public lands. These plans are developed at several spatial scales and are typically a component of fire management plans and other types of resource management plans. Such plans need to be compatible with national, regional, and...

  4. State-of-the-art study of resource characterization and planning for underground coal mining. Final technical report as of June 30, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walton, D.; Ingham, W.; Kauffman, P.

    With the rapid developments taking place in coal mining technology and due to high investment costs, optimization of the structure of underground coal mines is crucial to the success of the mining project. The structure of a mine, once it is developed, cannot be readily changed and has a decisive influence on the productivity, safety, economics, and production capacity of the mine. The Department of Energy desires to ensure that the resource characterization and planning activity for underground coal mining will focus on those areas that offer the most promise of being advanced. Thus, this project was undertaken by Managementmore » Engineers Incorporated to determine the status in all aspects of the resource characterization and planning activities for underground coal mining as presently performed in the industry. The study team conducted a comprehensive computerized literature search and reviewed the results. From this a selection of the particularly relevant sources were annotated and a reference list was prepared, catalogued by resource characterization and mine planning activity. From this data, and discussions with industry representatives, academia, and research groups, private and federal, an assessment and evaluation was made of the state-of-the-art of each element in the resource characterization and mine planning process. The results of this analysis lead to the identifcation of areas requiring research and, specifically, those areas where DOE research efforts may be focused.« less

  5. The requirements for implementing Sustainable Development Goals (SDGs) and for planning and implementing Integrated Territorial Investments (ITI) in mining areas

    NASA Astrophysics Data System (ADS)

    Florkowska, Lucyna; Bryt-Nitarska, Izabela

    2018-04-01

    The notion of Integrated Territorial Investments (ITI) appears more and more frequently in contemporary regional development strategies. Formulating the main assumptions of ITI is a response to a growing need for a co-ordinated, multi-dimensional regional development suitable for the characteristics of a given area. Activities are mainly aimed at improving people's quality of life with their significant participation. These activities include implementing the Sustainable development Goals (SDGs). Territorial investments include, among others, projects in areas where land and building use is governed not only by general regulations (Spatial Planning and Land Development Act) but also by separate legal acts. This issue also concerns areas with active mines and post-mining areas undergoing revitalization. For the areas specified above land development and in particular making building investments is subject to the requirements set forth in the Geological and Mining Law and in the general regulations. In practice this means that factors connected with the present and future mining impacts must be taken into consideration in planning the investment process. This article discusses the role of proper assessment of local geological conditions as well as the current and future mining situation in the context of proper planning and performance of the Integrated Territorial Investment programme and also in the context of implementing the SDGs. It also describes the technical and legislative factors which need to be taken into consideration in areas where mining is planned or where it took place in the past.

  6. 40 CFR 52.1119 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental Compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Massachusetts § 52.1119...

  7. 40 CFR 52.1519 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1519...

  8. Conceptualizing 2000: Proactive Planning.

    ERIC Educational Resources Information Center

    Angel, Dan, Ed.; DeVault, Mike, Ed.

    As community, technical, and junior colleges approach the 21st century, faculty shortages, an increasingly diverse student body, dwindling financial resources, and accountability mandates will require careful, action-oriented college planning. This two-part book presents 10 articles on the dynamics of planning and specific planning models, and…

  9. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    DOT National Transportation Integrated Search

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed by States...

  10. Connected vehicle impacts on transportation planning technical memorandum #6: skills and expertise required to incorporate connected vehicles into transportation planning.

    DOT National Transportation Integrated Search

    2016-02-08

    Professional development and training are essential to the incorporation of connected/automated vehicles (C/AV) into the transportation planning process. In order to guarantee a successful deployment, transportation planning agencies and their stakeh...

  11. Conjoint Analysis for New Service Development on Electricity Distribution in Indonesia

    NASA Astrophysics Data System (ADS)

    Widaningrum, D. L.; Chynthia; Astuti, L. D.; Seran, M. A. B.

    2017-07-01

    Many cases of illegal use of electricity in Indonesia is still rampant, especially for activities where the power source is not available, such as in the location of street vendors. It is not only detrimental to the state, but also harm the perpetrators of theft of electricity and the surrounding communities. The purpose of this study is to create New Service Development (NSD) to provide a new electricity source for street vendors' activity based on their preferences. The methods applied in NSD is Conjoint Analysis, Cluster Analysis, Quality Function Deployment (QFD), Service Blueprint, Process Flow Diagrams and Quality Control Plan. The results of this study are the attributes and their importance in the new electricity’s service based on street vendors’ preferences as customers, customer segmentation, service design for new service, designing technical response, designing operational procedures, the quality control plan of any existing operational procedures.

  12. The management of large cabling campaigns during the Long Shutdown 1 of LHC

    NASA Astrophysics Data System (ADS)

    Meroli, S.; Machado, S.; Formenti, F.; Frans, M.; Guillaume, J. C.; Ricci, D.

    2014-03-01

    The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most challenging activities concerns the cabling infrastructure (copper and optical fibre cables) serving the CERN data acquisition, networking and control systems. About 1000 kilometres of cables, distributed in different machine areas, will be installed, representing an investment of about 15 MCHF. This implies an extraordinary challenge in terms of project management, including resource and activity planning, work execution and quality control. The preparation phase of this project started well before its implementation, by defining technical solutions and setting financial plans for staff recruitment and material supply. Enhanced task coordination was further implemented by deploying selected competences to form a central support team.

  13. Conducting HIV Seroprevalence and Behavioral Epidemiology Risk Surveys (SABERS) Among Partner Military Populations.

    PubMed

    Macera, Caroline A; Ito, Stanley I; Hale, Braden R; Shaffer, Richard A; Thomas, Anne G; Dickieson, Janet

    2017-01-01

    Characterizing HIV infection and associated risk behaviors within military populations is critical for understanding the epidemic and informing prevention activities. However, the prevalence of HIV and related risk behaviors is often unknown. Further, militaries may not have the systems in place or the staff expertise to conduct HIV surveillance and risk behavior studies. The Department of Defense HIV/AIDS Prevention Program (DHAPP), funded by the President's Emergency Plan for AIDS Relief and the US Department of Defense, provides technical assistance, management and administrative support for HIV/AIDS prevention, care and treatment for approximately 65 partner militaries. Collaborating with partner militaries in conducting Seroprevalence and Behavioral Epidemiology Risk Surveys (SABERS) and using the data to monitor the epidemic and inform activities is a key component of DHAPP. This paper describes the methodology used to plan, adapt, implement and report SABERS studies. Copyright© Bentham Science Publishers; For any queries, please email at epub@benthamscience.org.

  14. The Close-Up Imager Onboard the ESA ExoMars Rover: Objectives, Description, Operations, and Science Validation Activities.

    PubMed

    Josset, Jean-Luc; Westall, Frances; Hofmann, Beda A; Spray, John; Cockell, Charles; Kempe, Stephan; Griffiths, Andrew D; De Sanctis, Maria Cristina; Colangeli, Luigi; Koschny, Detlef; Föllmi, Karl; Verrecchia, Eric; Diamond, Larryn; Josset, Marie; Javaux, Emmanuelle J; Esposito, Francesca; Gunn, Matthew; Souchon-Leitner, Audrey L; Bontognali, Tomaso R R; Korablev, Oleg; Erkman, Suren; Paar, Gerhard; Ulamec, Stephan; Foucher, Frédéric; Martin, Philippe; Verhaeghe, Antoine; Tanevski, Mitko; Vago, Jorge L

    The Close-Up Imager (CLUPI) onboard the ESA ExoMars Rover is a powerful high-resolution color camera specifically designed for close-up observations. Its accommodation on the movable drill allows multiple positioning. The science objectives of the instrument are geological characterization of rocks in terms of texture, structure, and color and the search for potential morphological biosignatures. We present the CLUPI science objectives, performance, and technical description, followed by a description of the instrument's planned operations strategy during the mission on Mars. CLUPI will contribute to the rover mission by surveying the geological environment, acquiring close-up images of outcrops, observing the drilling area, inspecting the top portion of the drill borehole (and deposited fines), monitoring drilling operations, and imaging samples collected by the drill. A status of the current development and planned science validation activities is also given. Key Words: Mars-Biosignatures-Planetary Instrumentation. Astrobiology 17, 595-611.

  15. Brownfields Green Avenue Sites: Technical Memorandum - Conceptual Design for Sustainable Redevelopment

    EPA Pesticide Factsheets

    This technical memorandum briefly describes the site and proposed conceptual site plan, indicates conceptual design considerations, specifies recommended green and sustainable features, and offers other recommendations

  16. A business man views commercial ventures in space.

    NASA Technical Reports Server (NTRS)

    Scarff, D. D.; Bloom, H. L.

    1973-01-01

    Paper reviews technical, resource planning and marketing steps an industrial organization must perform in arriving at a decision to undertake space development and production of commercial products or services for Users on the ground. Technical elements are supported by particular examples. Analysis of required resources emphasizes facility and financial inter-relationships between commercial organizations and NASA. Marketing planning covers elements of profitability. Paper addresses questions related to protection of corporate stockholders and public interest, investment decision timing, budget variations. Paper concludes with observations on timeliness of planning shuttle-based commercial ventures and on key industry/NASA problems and decisions.

  17. Three-dimensional path planning software-assisted transjugular intrahepatic portosystemic shunt: a technical modification.

    PubMed

    Tsauo, Jiaywei; Luo, Xuefeng; Ye, Linchao; Li, Xiao

    2015-06-01

    This study was designed to report our results with a modified technique of three-dimensional (3D) path planning software assisted transjugular intrahepatic portosystemic shunt (TIPS). 3D path planning software was recently developed to facilitate TIPS creation by using two carbon dioxide portograms acquired at least 20° apart to generate a 3D path for overlay needle guidance. However, one shortcoming is that puncturing along the overlay would be technically impossible if the angle of the liver access set and the angle of the 3D path are not the same. To solve this problem, a prototype 3D path planning software was fitted with a utility to calculate the angle of the 3D path. Using this, we modified the angle of the liver access set accordingly during the procedure in ten patients. Failure for technical reasons occurred in three patients (unsuccessful wedged hepatic venography in two cases, software technical failure in one case). The procedure was successful in the remaining seven patients, and only one needle pass was required to obtain portal vein access in each case. The course of puncture was comparable to the 3D path in all patients. No procedure-related complication occurred following the procedures. Adjusting the angle of the liver access set to match the angle of the 3D path determined by the software appears to be a favorable modification to the technique of 3D path planning software assisted TIPS.

  18. Where no flag has gone before: Political and technical aspects of placing a flag on the Moon

    NASA Technical Reports Server (NTRS)

    Platoff, Anne M.

    1993-01-01

    The flag on the Moon represents an important event in vexillological history. The political and technical aspects of placing a flag on the Moon, focusing on the first Moon landing, is examined. During their historic extravehicular activity, the Apollo 11 crew planted the flag of the United States on the lunar surface. This flag-raising was strictly a symbolic activity, as the United Nations Treaty on Outer Space precluded any territorial claim. Nevertheless, there were domestic and international debates over the appropriateness of the event. Congress amended the agency's appropriations bill to prevent the National Aeronautics and Space Administration (NASA) from placing flags of other nations, or those of international associations, on the Moon during missions funded solely by the United States. Like any activity in space exploration, the Apollo flag-raising also provided NASA engineers with an interesting technical challenge. They designed a flagpole with a horizontal bar allowing the flag to 'fly' without the benefit of wind to overcome the effects of the Moon's lack of an atmosphere. Other factors considered in the design were weight, heat resistance, and ease of assembly by astronauts whose space suits restricted their range of movement and ability to grasp items. As NASA plans a return to the Moon and an expedition to Mars, we will likely see flags continue to go 'where no flag has gone before'.

  19. 76 FR 47613 - Board Meeting: September 13-14, 2011-Salt Lake City, UT; the U.S. Nuclear Waste Technical Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... NUCLEAR WASTE TECHNICAL REVIEW BOARD Board Meeting: September 13-14, 2011--Salt Lake City, UT; the U.S. Nuclear Waste Technical Review Board Will Meet To Discuss DOE Plans for Used Fuel Disposition R... Amendments Act of 1987, the U.S. Nuclear Waste Technical Review Board will hold a public meeting in Salt Lake...

  20. RESEARCH AND DEVELOPMENT PRIORITIES IN TECHNICAL EDUCATION, A REPORT OF A NATIONAL RESEARCH PLANNING CONFERENCE IN TECHNICAL EDUCATION (THE OHIO STATE UNIVERSITY, JANUARY 10-11, 1967).

    ERIC Educational Resources Information Center

    MILLER, AARON J.

    A SELECT GROUP OF PARTICIPANTS REPRESENTING NATIONAL LEADERSHIP IN BUSINESS, INDUSTRY, RESEARCH, GOVERNMENT, AND EDUCATION MET TO IDENTIFY SOME OF THE MOST OBVIOUS NEW EMERGING TECHNICAL OCCUPATIONS WHICH MIGHT REQUIRE RESEARCH AND DEVELOPMENT EFFORTS AND SOME OF THE MOST PRESSING RESEARCHABLE PROBLEM AREAS IN TECHNICAL EDUCATION. THE NEW OR…

  1. Field support activity aerospace manpower transfer to small business enterprises

    NASA Technical Reports Server (NTRS)

    Green, M. K.

    1972-01-01

    This report reiterates the major findings of the original study on the utilization of unemployed aerospace professionals in small businesses, and also provides a definition of three programs which, as a result of this study and other research into this problem, offer great potential in providing for better utilization of the nation's technically trained personal and technology resources. Details of these three programs are provided along with a recommended plan of action for their implementation.

  2. Development of Reliability Based Life Prediction Methods for Thermal and Environmental Barrier Coatings in Ceramic Matrix Composites

    NASA Technical Reports Server (NTRS)

    Shah, Ashwin

    2001-01-01

    Literature survey related to the EBC/TBC (environmental barrier coating/thermal barrier coating) fife models, failure mechanisms in EBC/TBC and the initial work plan for the proposed EBC/TBC life prediction methods development was developed as well as the finite element model for the thermal/stress analysis of the GRC-developed EBC system was prepared. Technical report for these activities is given in the subsequent sections.

  3. Manual of Documentation Practices Applicable to Defence-Aerospace Scientific and Technical Information. Volume 1. Section 1 - Acquisition and Sources. Section 2 - Descriptive Cataloguing. Section 3 - Abstracting and Subject Analysis

    DTIC Science & Technology

    1978-08-01

    weeding I I ORGANISATION & MANAGEMENT Aims and objectives, staffing, promotional activities, identifying u;ers 12 NETWORKS & EXTERNAL SOURCES OF...Acquisition Clerks with typing capability are required for meticulous recordkeeping. Typing capability of 50 words per minute and a working knowledge ...81 Adminhistration and Management Includes management planning and research. 64 Numerical Analysis Includes iteration, difference equations, and 82

  4. International perspectives on sharing clinical data with patients.

    PubMed

    Prey, Jennifer E; Polubriaginof, Fernanda; Kuperman, Gilad J; Tiase, Victoria; Collins, Sarah A; Vawdrey, David K

    2016-02-01

    Engaging patients in their care has become a topic of increasing importance, and enabling patients to have access to their clinical data is a key aspect of such engagement. We investigated, on an international scale, the current state of approaches for providing patients with access to their own clinical information. Individuals from 28 countries were invited to participate in a cross-sectional semi-structured interview. Interview questions focused on social and cultural influences that affected patient engagement activities, government support for current and planned initiatives, data ownership models, and technical issues. Interviews were conducted with individuals from 16 countries representing six continents. Respondents reported substantive initiatives for providing information to patients in the majority of countries interviewed. These initiatives were diverse in nature and stage of implementation. Enabling patient access to data is occurring on an international scale. There is considerable variability in the level of maturity, the degree of government involvement, the technical infrastructure, and the plans for future development across the world. As informaticians, we are still in the early stages of deploying patient engagement technologies and have yet to identify optimal strategies in this arena. Efforts to improve patient access to data are active on a global-scale. There are many open questions about best practices and much can be learned by adopting an international perspective to guide future implementation efforts. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  5. Fundamental Aeronautics Program: Overview of Propulsion Work in the Supersonic Cruise Efficiency Technical Challenge

    NASA Technical Reports Server (NTRS)

    Castner, Ray

    2012-01-01

    The Supersonics Project, part of NASA's Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2012) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  6. Creating a bridge between data collection and program planning: a technical assistance model to maximize the use of HIV/AIDS surveillance and service utilization data for planning purposes.

    PubMed

    Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R

    2005-12-01

    Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.

  7. Virtual Preoperative Planning and Intraoperative Navigation in Facial Prosthetic Reconstruction: A Technical Note.

    PubMed

    Verma, Suzanne; Gonzalez, Marianela; Schow, Sterling R; Triplett, R Gilbert

    This technical protocol outlines the use of computer-assisted image-guided technology for the preoperative planning and intraoperative procedures involved in implant-retained facial prosthetic treatment. A contributing factor for a successful prosthetic restoration is accurate preoperative planning to identify prosthetically driven implant locations that maximize bone contact and enhance cosmetic outcomes. Navigational systems virtually transfer precise digital planning into the operative field for placing implants to support prosthetic restorations. In this protocol, there is no need to construct a physical, and sometimes inaccurate, surgical guide. The report addresses treatment workflow, radiologic data specifications, and special considerations in data acquisition, virtual preoperative planning, and intraoperative navigation for the prosthetic reconstruction of unilateral, bilateral, and midface defects. Utilization of this protocol for the planning and surgical placement of craniofacial bone-anchored implants allows positioning of implants to be prosthetically driven, accurate, precise, and efficient, and leads to a more predictable treatment outcome.

  8. Summary Report: Risk Assessment Forum Technical Workshop on Population-level Ecological Risk Assessment

    EPA Pesticide Factsheets

    2008 technical workshop regarding development of additional guidelines or best practices for planning, implementing and interpreting ecological risk assessments that involve population-level assessment endpoints.

  9. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... projects of the Plan, including pilot projects and operational elements, based on the best scientific, technical, funding, contracting, and other information available. The Corps of Engineers and the South...

  10. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  11. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The NASA Research and Technology program for FY 1978 is represented by this compilation of the 'Summary' portions of each of the Research and Technology Objectives and Plans (RTOPS). The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section contains citations and abstracts of the RTOPs. Following this section are four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  12. Installation restoration program. Closure assessment report for UST removals at sites 4 and 5 - petroleum, oils, and lubricants facility. Virginia Air National Guard, 192nd Fighter Group, Richmond International Airport, Sandston, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less

  13. Community-Based Participatory Initiatives to Increase Breastfeeding Rates in Indiana.

    PubMed

    Friesen, Carol A; Hormuth, Laura J; Cardarelli, Tina L

    2015-11-01

    In 2012, the Centers for Disease Control and Prevention awarded the Indiana State Department of Health funding for breastfeeding activities. The grant, issued in part in response to the 2011 Surgeon General's Call to Action to Support Breastfeeding, focused on providing funding and technical support to small community-based organizations to address challenges encountered by breastfeeding mothers. Indiana used the funds to develop the Community Breastfeeding Support Initiative (CBSI). The goal was to provide funding and technical support to small community-based organizations to carry out self-selected projects in their communities. The 13 CBSI programs served 1345 individual clients (n = 3664 visits) during the 9-month period. This article provides valuable information about collaboration at the state level and the supporting infrastructure in place to carry out this project. Our findings about the number of clients served, number of visits, community-specific programs and activities, and lessons learned can be used by other organizations as they plan breastfeeding support programs for their community. © The Author(s) 2015.

  14. Defense Technical Information Center (DTIC) - Its role in the USAF Scientific and Technical Information Program

    NASA Technical Reports Server (NTRS)

    Kuhn, Allan D.

    1991-01-01

    The Defense Technical Information Center (DTIC), the central repository for DOD scientific and technical information concerning studies and research and engineering efforts, is discussed. The present makeup of DTIC is described and its functions in producing technical reports and technical report bibliographies are examined. DTIC's outreach services are reviewed, as are its DTIC information and technology transfer programs. DTIC's plans for the year 2000 and its relation to the mission of the U.S. Air Force, including the Air Force's STINFO program, are addressed.

  15. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less

  16. 13 CFR 313.5 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical assistance to: (1) Diversify and strengthen the economy in the Impacted Community; (2) Identify...; and (3) Develop or update a Strategic Plan in accordance with § 313.6 to address economic adjustment...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stein, Joshua

    In 2014, the IEA PVPS Task 13 added the PVPMC as a formal activity to its technical work plan for 2014-2017. The goal of this activity is to expand the reach of the PVPMC to a broader international audience and help to reduce PV performance modeling uncertainties worldwide. One of the main deliverables of this activity is to host one or more PVPMC workshops outside the US to foster more international participation within this collaborative group. This report reviews the results of the first in a series of these joint IEA PVPS Task 13/PVPMC workshops. The 4th PV Performance Modelingmore » Collaborative Workshop was held in Cologne, Germany at the headquarters of TÜV Rheinland on October 22-23, 2015.« less

  18. Energy Savings Lifetimes and Persistence

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Ian M.; Schiller, Steven R.; Todd, Annika

    2016-02-01

    This technical brief explains the concepts of energy savings lifetimes and savings persistence and discusses how program administrators use these factors to calculate savings for efficiency measures, programs and portfolios. Savings lifetime is the length of time that one or more energy efficiency measures or activities save energy, and savings persistence is the change in savings throughout the functional life of a given efficiency measure or activity. Savings lifetimes are essential for assessing the lifecycle benefits and cost effectiveness of efficiency activities and for forecasting loads in resource planning. The brief also provides estimates of savings lifetimes derived from amore » national collection of costs and savings for electric efficiency programs and portfolios.« less

  19. Evaluation and capacity building to improve precollege science and mathematics achievement in the US: 10 CFR, Part 605. Technical progress report, June--December 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    The National Center for Improving Science Education has undertaken activities to achieve evaluation goals for DOE`s Precollege programs: develop means to determine program quality; develop means for determining the contribution of DOE precollege programs to both teacher enhancement and student achievement; provide evaluation designs and instruments and reports of program quality and impact; and strengthen both DOE`s and the Labs` capacity to do both short- and long-term planning as well as deliver effective programs and evaluation. Appendices include evaluation/technical assistance report, profiling teacher research participation and teacher development programs, teacher surveys, impact assessment design, and teacher research participation programs anecdotesmore » for 8 labs.« less

  20. Proceedings of the Fifteenth NASA Propagation Experimenters Meeting (NAPEX 15) and the Advanced Communications Technology Satellite (ACTS) Propagation Studies Miniworkshop

    NASA Technical Reports Server (NTRS)

    Davarian, Faramaz (Editor)

    1991-01-01

    The NASA Propagation Experimenters Meeting (NAPEX), supported by the NASA Propagation Program, is convened annually to discuss studies made on radio wave propagation by investigators from domestic and international organizations. The meeting was organized into three technical sessions. The first session was dedicated to Olympus and ACTS studies and experiments, the second session was focused on the propagation studies and measurements, and the third session covered computer-based propagation model development. In total, sixteen technical papers and some informal contributions were presented. Following NAPEX 15, the Advanced Communications Technology Satellite (ACTS) miniworkshop was held on 29 Jun. 1991, to review ACTS propagation activities, with emphasis on ACTS hardware development and experiment planning. Five papers were presented.

Top